Water Rate Study
April 1, 2025
City of
Signal Hill
Tuesday, April 1, 2025
Mr. Thomas Bekele
Public Works Director
City of Signal Hill
2175 Cherry Ave
Signal Hill, CA 90755
Subject: Water Rate Study Report
Dear Mr. Bekele,
Raftelis is pleased to provide this Water Rate Study Report for the City of Signal Hill (City). This Report includes the development of a financial plan for the fiscal years FY 2025 through FY 2035 and proposed water rates for adoption and implementation for five years, beginning in July 2025.
The major objectives of the study include the following:
1. Development of a financial plan and proposed revenue adjustments to ensure financial sufficiency, reserves funding at satisfactory levels, and funding for planned capital investments.
2. Calculation of water rates that fully recover the City’s cost of providing service.
3. Ensure long-term financial sustainability of the City’s Water enterprise.
The Study details the financial inputs, estimates, projections, key findings, and recommendations which collectively develop the financial plan and corresponding proposed water rates.
We thank you and other City staff for their support during this study.
Sincerely,
Raftelis Financial Consultants, Inc.
Kevin Kostiuk Ellyse Ritchie
Senior Manager Senior Consultant
CITY OF SIGNAL HILL
Table of Contents
1. EXECUTIVE SUMMARY ................................................................................................................ 8
1.1. Study Background ........................................................................................................................... 8
1.2. Agency Overview ............................................................................................................................ 8
1.3. Current Rates .................................................................................................................................. 8
1.4. Legal Framework .......................................................................................................................... 10
1.4.1. California Constitution – Article XIII D, Section 6 (Proposition 218) .............................................. 11
1.4.2. California Constitution – Article X, Section 2 .................................... Error! Bookmark not defined.
1.5. Cost-Based Rate Setting Methodology ......................................................................................... 11
1.5.1. Revenue Requirement Determination ........................................................................................... 11
1.5.2. Cost of Service Analysis (COS) .................................................................................................... 11
1.5.3. Rate Design and Calculations ....................................................................................................... 12
1.5.4. Rate Adoption ............................................................................................................................... 12
1.6. Cost of Service .............................................................................................................................. 12
1.7. Results and Recommendations .................................................................................................... 12
1.8. Proposed Rates ............................................................................................................................ 14
1.9. Customer Impacts ......................................................................................................................... 16
2. INTRODUCTION .......................................................................................................................... 18
2.1. Study Background ......................................................................................................................... 18
2.2. Agency Overview .......................................................................................................................... 18
3. KEY INPUTS AND ESTIMATES .................................................................................................. 19
3.1. Key Information Used in this Study ............................................................................................... 19
3.2. Current Rates ................................................................................................................................ 19
3.3. Escalation Factors ........................................................................................................................ 21
3.4. Proposed Reserve Funding .......................................................................................................... 22
3.5. Projected Water Demand and Connection Growth ....................................................................... 23
3.6. Projected Water Supply ................................................................................................................ 29
4. FINANCIAL PLAN ........................................................................................................................ 31
4.1. Factors Affecting Revenue Adjustments ....................................................................................... 31
4.2. Status Quo Financial Plan – No Revenue Adjustments ................................................................ 31
4.2.1. Revenues ...................................................................................................................................... 31
4.2.2. Operating and Maintenance (O&M) Expenses.............................................................................. 32
4.2.3. Capital Improvement Program ...................................................................................................... 35
4.2.4. Debt Service ................................................................................................................................. 38
4.2.5. Status Quo Financial Plan Cash Flow ........................................................................................... 38
WATER RATE STUDY
4.2.6. Status Quo Unrestricted Cash Balance Projections ...................................................................... 39
4.3. Proposed Financial Plan ............................................................................................................... 41
4.3.1. Financial Plan Adjustments ........................................................................................................... 41
4.3.2. Existing and Proposed Debt Service ............................................................................................. 43
4.3.3. Capital Financing Plan .................................................................................................................. 43
4.3.4. Proposed Financial Plan ............................................................................................................... 44
4.3.5. Proposed Reserve Funding .......................................................................................................... 47
4.3.6. Unrestricted Cash Balance Projections ......................................................................................... 48
5. PROPOSED RATES .................................................................................................................... 54
5.1. Monthly Meter Service Charges .................................................................................................... 54
5.2. Fire Service Charges .................................................................................................................... 54
5.3. Consumption Charges .................................................................................................................. 55
6. CUSTOMER BILL IMPACTS ....................................................................................................... 56
6.1. Monthly Water Bill Impacts............................................................................................................ 56
7. APPENDIX A: INFLATED TEN-YEAR CAPITAL IMPROVEMENT PLAN .................................. 58
8. APPENDIX B: TEN-YEAR ENTERPRISE FINANCIAL PLAN ..................................................... 58
CITY OF SIGNAL HILL
List of Tables
Table 1-1: Current Monthly Meter Service Charges ($/Month) ..................................................................................... 9 Table 1-2: Current Monthly Residential Fire Service Charges ($/Month) ..................................................................... 9 Table 1-3: Current Monthly Business Fire Service Charges ($/Month) ...................................................................... 10 Table 1-4: Current Water Usage Charges ($/CCF) .................................................................................................... 10 Table 1-5: Recommended Revenue Adjustments ...................................................................................................... 14 Table 1-6: Proposed Monthly Meter Service Charges ($/Month) ............................................................................... 14 Table 1-7: Proposed Monthly Fire Service Charges ($/Month) .................................................................................. 16 Table 1-8: Proposed Water Usage Rates ($/CCF) ..................................................................................................... 16 Table 3-1: Current Monthly Fixed Charges ($/Month) ................................................................................................ 20 Table 3-2: Current Monthly Residential Fire Service Charges ($/Month) ................................................................... 20 Table 3-3: Current Monthly Business Fire Service Charges ($/Month) ...................................................................... 20 Table 3-4: Current Water Usage Rates ($/CCF) ........................................................................................................ 21 Table 3-5: Escalation Factors ..................................................................................................................................... 22 Table 3-6: Proposed Cash Reserve Targets .............................................................................................................. 23 Table 3-7: Water Demand Factors ............................................................................................................................. 25 Table 3-8: Projected Water Connection Growth and Water Demand ......................................................................... 27 Table 3-9: Projected Number of Water Meters, by Meter Size ................................................................................... 27 Table 3-10: Projected Number of Residential Fire Lines, by Line Size ...................................................................... 27 Table 3-11: Projected Number of Business Fire Lines, by Line Size ......................................................................... 28 Table 3-12: Projected Water Usage by Class and Tier .............................................................................................. 29 Table 3-13: Projected Water Supply Mix .................................................................................................................... 29 Table 4-1: Projected Water Revenues ........................................................................................................................ 32 Table 4-2: Projected O&M Expenses ......................................................................................................................... 32 Table 4-3: Projected Water Supply Mix (Volume)....................................................................................................... 33 Table 4-4: Projected Water Production and Purchase Costs ($) ................................................................................ 35 Table 4-5: Projected Capital Improvement Plan (Summary by Type) ........................................................................ 38 Table 4-6: Existing Annual Debt Service .................................................................................................................... 38 Table 4-7: Status Quo Financial Plan ......................................................................................................................... 39 Table 4-8: Unrestricted Cash Balances – Status Quo Financial Plan ........................................................................ 41 Table 4-9: Recommended Revenue Adjustments ...................................................................................................... 43 Table 4-10: Existing and Proposed Future Annual Debt Service ............................................................................... 43 Table 4-11: Capital Financing Plan ............................................................................................................................. 44 Table 4-12: Proposed Financial Plan .......................................................................................................................... 47 Table 4-13: Proposed Cash Reserve Targets ............................................................................................................ 48 Table 4-14: Unrestricted Cash Balances - Proposed Financial Plan ......................................................................... 51 Table 5-1: Current and Proposed Monthly Meter Service Charges............................................................................ 54 Table 5-2: Current and Proposed Residential Fire Service Charges ......................................................................... 54 Table 5-3: Current and Proposed Commercial Fire Service Charges ........................................................................ 55 Table 5-4: Current and Proposed Consumption Charges ($/CCF) ............................................................................ 55 Table 6-1: FY 2023 Water Use per Account - Single Family Residential ................................................................... 56 Table 6-2: FY 2023 Water Use per Account - CII ....................................................................................................... 57 Table 8-1: Ten-Year Water Financial Plan Assumptions ............................................................................................ 59 Table 8-2: Ten-Year Water Enterprise Financial Plan ................................................................................................ 60
WATER RATE STUDY
List of Figures
Figure 1-1: Monthly Customer Bill Impacts – Single Family Residential .................................................................... 17 Figure 1-2: Monthly Bill Impacts at Various Levels of Usage – Residential, 3/4-inch Meter ...................................... 17 Figure 4-1: Projected Debt Coverage ......................................................................................................................... 52 Figure 4-2: Proposed Operating Financial Plan.......................................................................................................... 52 Figure 4-3: Projected Ending Fund Balances ............................................................................................................. 53 Figure 4-4: Proposed Capital Improvement Program and Funding ............................................................................ 53 Figure 6-1: Single Family Residential Monthly Water Bill Impacts (FY 2023) ............................................................ 56 Figure 6-2: Commercial Monthly Water Bill Impacts (FY 2023) ................................................................................. 57 Figure 8-1: 10-Year Capital Improvement Program and Funding .............................................................................. 62 Figure 8-2: 10-Year Water Projected Debt Coverage ................................................................................................ 62 Figure 8-3: 10-Year Water Enterprise Projected Ending Balances ............................................................................ 63 Figure 8-4: 10-Year Water Enterprise Operating Financial Plan ................................................................................ 63
CITY OF SIGNAL HILL
This page intentionally left blank to facilitate two-sided printing.
WATER RATE STUDY
1.Executive Summary
1.1.Study Background
The City of Signal Hill (City) engaged Raftelis in 2024 to complete a Water Rate Study (Study) in conjunction with a Water Master Plan (WMP) Study, conducted by Dudek. The Study consisted of developing a long-range financial plan, evaluating financial policies, modeling financial alternatives to fund future capital re-investment, and calculating water rates for a five-year period. The Study incorporates updated inputs, estimates, and projections based on the most recently available financial information and customer billing data, as well as the capital improvement program (CIP) results of the WMP by Dudek.
The study encompasses a ten-year financial planning period from fiscal year (FY) 2025 to FY 2034 and five years of proposed rates, for adoption beginning July 1, 2025 and in July of every year thereafter. For the purposes of this study, FY 2026 is the year starting on July 1, 2025, and ending on June 30, 2026.
Raftelis collaborated closely with City staff to provide revenue adjustments that meet the City’s objectives. The main objectives that informed the study include:
» Development of a financial plan and proposed revenue adjustments to ensure cash reserves funding at proposed levels and funding for capital improvements.
» Minimizing rate impacts to customers while maintaining adequate reserves for all years of the study. » Maintaining the existing water rate structure that customers know and that serves the City well. » Rates that fully recover the City Water enterprise’s costs of providing water service.
1.2.Agency Overview
The City of Signal Hill’s water department provides water service to a population of over 11,000 people through about 3,150 metered water connections. The City’s water system consists of:
» Approximately 50 miles of transmission and distribution pipeline; » One water treatment plant;
» One MWD imported water connection;
» Three groundwater production wells;
» Three booster pump stations;
» Three storage reservoirs.
Water supplied to the City comes from various sources, which include water from three groundwater wells, and supplemental water purchases from Metropolitan Water District of Southern California (MWD). The local groundwater supply originates from the San Gabriel mountains, which then flows down the San Gabriel River watershed and makes its way underground into the Central Basin. Upon the completion and permitting of Well No. 10, the City’s wells will be capable of producing a combined flow of approximately 2,100 GPM and are expected to supply 70.0 percent of the City’s water from FY 2026 onward.
1.3.Current Rates
The current rates, adopted in June 2020 and last updated in January 2024, were originally developed in a 2020 rate study. The City’s existing water rate structure consists of the following components:
CITY OF SIGNAL HILL
1. Monthly meter charge – for all water customers, based on meter size
2. Monthly private fire line charge – for all customers with private fire lines, based on fire line size
3. Water usage rate – for all customers, per one hundred cubic feet (CCF) of usage, customer class, and/or tier
a. Residential – two-tier rate structure
i. Single Family Residential (SFR)
ii. Multi-Family Residential (MFR)
b. Commercial, Industrial, and Institutional – three-tier rate structure c. Irrigation – two-tier rate structure
Table 1-1 shows the City’s current monthly meter charges.
Table 1-1: Current Monthly Meter Service Charges ($/Month) A B C
Line Meter Size FY 2025
1 5/8" $25.76
2 3/4" $25.76
3 1" $66.30
4 1 1/2" $146.15
5 2" $253.25
6 3" $567.40
7 4" $567.40
8 6" $567.40
9 8" $567.40
10 10" $1,810.06
The City imposes a fixed monthly fire line service charge on properties that are required to install1 a private fire
suppression system as a condition of extending or initiating water service, or where the customer or property owner has installed a private fire line for the purpose of fire protection. The rates for the monthly fire line service charge are established based on the diameter of the fire line serving a property. They are calculated to recover the costs associated with fire service capacity in the water distribution system. Table 1-2 shows the City’s current monthly residential fire service charges.
Table 1-2: Current Monthly Residential Fire Service Charges ($/Month) A B C
Line Fireline Diameter FY 2025
1 2" $121.79
2 4" $240.77
3 6" $362.01
4 8" $457.02
5 10" $457.02
Table 1-3 shows the City’s current monthly business private fire line charges. 1 Installation of fire suppression is required by law.
WATER RATE STUDY
Table 1-3: Current Monthly Business Fire Service Charges ($/Month) A B C
Line Fireline Diameter FY 2025
1 2" $205.95
2 3" $205.95
3 4" $457.02
4 6" $457.02
5 8" $457.02
6 10" $457.02
The volumetric component of a customer’s water bill is calculated based on the number of units of water delivered to a property, measured in CCF, multiplied by the rate(s) that vary by customer class and tier. The current tier widths and rates are shown in Table 1-4. The volumetric component of a customer's bill is determined by multiplying the amount of use in each tier by the associated rate.
Table 1-4: Current Water Usage Charges ($/CCF)
A B C D
Line Class/Tier Monthly
Tier (CCF)
FY 2025
($/CCF)
Residential - Single Family
1 Tier 1 0-15 $4.38
2 Tier 2 >16 $6.99
Residential - Multi-Family
3 Tier 1 0-15 $4.38
4 Tier 2 >16 $6.99
Commercial, Industrial, and Institutional
5 Tier 1 0-15 $4.38
6 Tier 2 16-150 $6.99
7 Tier 3 >151 $10.29
Irrigation
8 Tier 1 0-15 $4.38
9 Tier 2 >16 $6.66
1.4.Legal Framework2
The rate-making process for water agencies in California begins with a review of Proposition 218, the main legal framework in the State governing water rates.
2 Raftelis does not practice law nor does it provide legal advice. The above discussion provides a general overview of Raftelis’ understanding as rate practitioners and is labeled “legal framework” for literary convenience only. The DWP should consult with its legal counsel for specific guidance.
CITY OF SIGNAL HILL
1.4.1.CALIFORNIA CONSTITUTION – ARTICLE XIII D, SECTION 6 (PROPOSITION 218)
Proposition 218 was enacted by voters in 1996 to ensure, in part, that fees and charges imposed for ongoing delivery of a service to a property (“property-related fees and charges”) are proportional to, and do not exceed, the cost of providing service. Water service fees and charges are property-related and subject to the provisions of Proposition 218. The principal requirements, as they relate to public water service fees and charges, are as follows:
1. Revenues derived from a property-related charge imposed by a public agency shall not exceed the costs required to provide the property-related service.
2. Revenues derived by the fee or charge shall not be used for any purpose other than that for which the fee or charge was imposed.
3. The amount of the fee or charge imposed upon any parcel shall not exceed the proportional cost of service attributable to the parcel.
4. No fee or charge may be imposed for a service unless that service is actually used or immediately available to the owner of property.
5. A written notice of the proposed fee or charge shall be mailed to the record owner of each parcel not less than 45 days prior to a public hearing, when the agency considers all written protests against the charge.
As stated in the American Water Works Association’s (AWWA) Manual of Water Supply Practices M1, Principles of Water Rates, Fees, and Charges, Seventh Edition (M1 Manual), “water rates and charges should be recovered from classes of customers in proportion to the cost of serving those customers.” Proposition 218 requires that water rates be supported by substantial, reliable evidence demonstrating compliance with the requirements described above.
1.5.Cost-Based Rate Setting Methodology
There are four primary steps to develop utility rates that align with Proposition 218. These steps are outlined below.
1.5.1.REVENUE REQUIREMENT DETERMINATION
The rate-making process starts by determining the base year (Test Year) revenue requirement, which for this Study is Fiscal Year 2025 which runs from July 1, 2024 through June 30, 2025. The revenue requirement should sufficiently fund the utility’s O&M expenses, debt service, capital expenses, and reserve funding. The revenue requirement represents the total cost to provide service.
1.5.2.COST OF SERVICE ANALYSIS (COS)
The annual cost of providing water service is distributed among customer classes commensurate with their service requirements. A COS analysis involves the following:
1. Identify the revenue requirement, as mentioned immediately above
2. Functionalize operating and capital costs. Examples of functions include supply, treatment, transmission, distribution, storage, meter servicing, and customer billing.
3. Allocate functionalized costs to cost components. Cost components may include supply, base delivery, maximum day, maximum hour3
, conservation, fire protection, meter servicing, and customer servicing and billing costs.
4. Distribute the cost components. Distribute cost components, using unit rates, to customer classes in proportion to their demands and burdens on the water system. This is described in the M1 Manual published by AWWA.
3 Collectively maximum day and maximum hour costs are known as extra-capacity, or “peaking” costs
WATER RATE STUDY
1.5.3.RATE DESIGN AND CALCULATIONS
Rates do more than simply recover costs. Within the legal framework and industry standards, properly designed rates should support and optimize a blend of utility objectives, so long as rates are cost-justified. In addition to communicating the price of water service, cost-justified rates act as a public information tool in communicating pricing objectives to customers.
1.5.4.RATE ADOPTION
Rate adoption is the last step of the rate-making process. Raftelis memorializes the rate study results in a study report which documents the basis upon which the rates were calculated, the rationale and justifications behind the proposed charges, any changes to rate structures, and anticipated financial impacts to ratepayers.
Changes to rates and impacts to ratepayers can happen for a variety of reasons, including, but not limited to: a change in the total costs to serve customers; changes to the areas in which operating and capital costs are incurred; changes to water system components; changes to a water system’s customer base and demand patterns; changes in cost of service methodology; and changes to rate structures and design.
1.6.Cost of Service
As directed by the City, this study relies on the existing cost of service and adjusts water rates based on the results of the financial plan. All rates are increased proportionally based on the existing rates and rate structures.
1.7.Results and Recommendations
The results and recommendations that Raftelis developed in collaboration with City staff and Council include the following:
» Planned revenue adjustments (gross revenue increases) not to exceed 15.0 percent per year in FY 2026 and FY 2027; 14.0 percent per year in FY 2028 and FY 2029; and 10.0 percent in FY 2030 » A loan from the City’s General Fund of $3.0 million for partial funding of the Gundry Reservoir roof replacement project. This loan assumes a 20-year term at an interest rate of 3% » An alternative reserve policy targeted additional days of cash on hand to reduce financial risk and ensure execution of the CIP
» Continuity of the existing rate structure and rate design The proposed revenue adjustment for the rate-making year, FY 2026, is 15.0 percent. The revenue adjustment, or the percentage increase in total rate revenues, is determined by various factors that influence both the revenue adjustments and the water rates. The three main drivers affecting revenue adjustments for this Study include increased reserve funding, capital improvement projects, and inflationary pressure impacting operating and maintenance (O&M) and capital costs. Without additional revenue adjustments, the City cannot maintain existing or proposed reserve levels, achieve minimum debt service coverage requirements, or adequately fund long-term CIP expenditures.
CITY OF SIGNAL HILL
Table 1-5 shows the recommended revenue adjustments for the study period.
WATER RATE STUDY
Table 1-5: Recommended Revenue Adjustments
A B C D
Line Fiscal Year Effective
Month
Proposed
Revenue
Adjustment
1 FY 2026 July 15.0%
2 FY 2027 July 15.0%
3 FY 2028 July 14.0%
4 FY 2029 July 14.0%
5 FY 2030 July 10.0%
1.8.Proposed Rates
The proposed water rates are based on the recommended revenue adjustments described above. The proposed rates for FY 2026, the rate-setting year, are a result of applying the recommended FY 2026 increase to the existing rates.
Rates for all years beyond FY 2026 are increased based on the proposed annual revenue adjustment in that year.
Table 1-6 shows the proposed monthly meter charges by meter size for the study period. All rates are rounded to the nearest penny.
Table 1-6: Proposed Monthly Meter Service Charges ($/Month)
A B C D E F G
Line Meter Size FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 1 5/8" $29.62 $34.07 $38.84 $44.27 $48.70
2 3/4" $29.62 $34.07 $38.84 $44.27 $48.70
3 1" $76.25 $87.68 $99.96 $113.95 $125.35
4 1 1/2" $168.07 $193.28 $220.34 $251.19 $276.31
5 2" $291.24 $334.92 $381.81 $435.27 $478.79
6 3" $652.51 $750.39 $855.44 $975.20 $1,072.72
7 4" $652.51 $750.39 $855.44 $975.20 $1,072.72
8 6" $652.51 $750.39 $855.44 $975.20 $1,072.72
9 8" $652.51 $750.39 $855.44 $975.20 $1,072.72
10 10" $2,081.57 $2,393.80 $2,728.94 $3,110.99 $3,422.09
CITY OF SIGNAL HILL
Table 1-7 shows the proposed monthly Fire Service Charges for the study period for those connections to the system that have dedicated private firelines. All rates are rounded to the nearest penny.
WATER RATE STUDY
Table 1-7: Proposed Monthly Fire Service Charges ($/Month)
A B C D E F G
Line Fire Line Diameter FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Residential Fire Lines
1 2" $140.06 $161.07 $183.62 $209.32 $230.26
2 4" $276.89 $318.42 $363.00 $413.82 $455.20
3 6" $416.31 $478.76 $545.78 $622.19 $684.41
4 8" $525.57 $604.41 $689.03 $785.49 $864.04
5 10" $525.57 $604.41 $689.03 $785.49 $864.04
Business Fire Lines
6 2" $236.84 $272.37 $310.50 $353.97 $389.37
7 3" $236.84 $272.37 $310.50 $353.97 $389.37
8 4" $525.57 $604.41 $689.03 $785.49 $864.04
9 6" $525.57 $604.41 $689.03 $785.49 $864.04
10 8" $525.57 $604.41 $689.03 $785.49 $864.04
11 10" $525.57 $604.41 $689.03 $785.49 $864.04
Table 1-8 shows the proposed Water Usage Rates. The proposed rates for FY 2026 result from applying the recommended FY 2026 increase to the existing rates. Rates for all years beyond FY 2026 are adjusted based on the proposed annual revenue adjustment in that year. All customer are billed for water use on a monthly basis. All rates are rounded to the nearest penny.
Table 1-8: Proposed Water Usage Rates ($/CCF)
A B C D E F G H
Line Class/Tier
Monthly
Tier
(CCF)
FY 2026 FY 2027 FY 2028 FY 2029 FY 2030
Residential - Single Family
1 Tier 1 0-15 $5.04 $5.80 $6.61 $7.54 $8.29
2 Tier 2 >16 $8.04 $9.25 $10.55 $12.03 $13.23
Residential - Multi-Family
3 Tier 1 0-15 $5.04 $5.80 $6.61 $7.54 $8.29
4 Tier 2 >16 $8.04 $9.25 $10.55 $12.03 $13.23
Commercial, Industrial, and Institutional
5 Tier 1 0-15 $5.04 $5.80 $6.61 $7.54 $8.29
6 Tier 2 16-150 $8.04 $9.25 $10.55 $12.03 $13.23
7 Tier 3 >151 $11.83 $13.60 $15.50 $17.67 $19.44
Irrigation
8 Tier 1 0-15 $5.04 $5.80 $6.61 $7.54 $8.29
9 Tier 2 >16 $7.66 $8.81 $10.04 $11.45 $12.60
1.9.Customer Impacts
Figure 1-1 shows the distribution of monthly customer bill impacts for all Residential customer bills based on the City’s most recent customer billing data. Impacts are calculated for FY 2026, the first year of rate increases. It is
CITY OF SIGNAL HILL
estimated that 60 percent of single-family residential bills (or 11,860 bills) will experience an increase to their monthly water bill of $10 or less.
Figure 1-1: Monthly Customer Bill Impacts – Single Family Residential Figure 1-2 shows the monthly bill impacts at various levels of usage for a residential customer with a 3/4 -inch meter, based on the City’s FY 2023 customer billing data. The median residential customer bill is 6 CCF of water per month.
A customer using 6 CCF per month would experience an increase of $7.81 to their monthly water bill.
Figure 1-2: Monthly Bill Impacts at Various Levels of Usage – Residential, 3/4-inch Meter 0 1,530
10,330
6,882
995
53 7 0 0 0
0 2,000
4,000
6,000
8,000
10,000
12,000
<= $0 > $0 to
$5
> $5 to
$10
> $10 to
$20
> $20 to
$50
> $50 to
$100
> $100 to
$250
> $250 to
$500
> $500 to
$1000
> $1000
Number of Customer Bills
$ Change in Monthly Bill
Very Low - 2 ccf Low - 4 ccf Medium - 6 ccf High - 9 ccf Very High - 15 ccf
Current Bill $34.52 $43.28 $52.04 $65.18 $91.46
Proposed Bill $39.70 $49.77 $59.85 $74.96 $105.18
Impact ($) $5.18 $6.49 $7.81 $9.78 $13.72
$0
$20
$40
$60
$80
$100
$120
WATER RATE STUDY
2.Introduction
2.1.Study Background
The City of Signal Hill (City) engaged Raftelis in 2024 to complete a Water Rate Study (Study) in conjunction with a Water Master Plan (WMP) Study, conducted by Dudek. The Study consisted of developing a long-range financial plan, evaluating financial policies, modeling financial alternatives with which to fund future capital re-investment, and calculating water rates for a five-year period. The Study incorporates updated inputs, estimates, and projections based on the most recently available financial information and customer billing data, as well as the CIP results of the WMP by Dudek.
The Study encompasses a ten-year financial planning period from fiscal year (FY) 2025 to FY 2034 and five years of proposed rates, for implementation beginning July 1, 2025 and each July thereafter. For the purposes of this study, FY 2026 is the year starting on July 1, 2025, and ending on June 30, 2026.
Raftelis collaborated closely with City staff to provide revenue adjustments that meet the City’s objectives. The main objectives that informed the study include:
» Development of a financial plan and proposed revenue adjustments to ensure cash reserves funding at proposed levels and funding for capital improvements.
» Minimizing rate impacts to customers while maintaining adequate reserves for all years of the study. » Developing rates that are defensible, promote efficient use of water, and are easy for customers to understand.
» Maintaining the existing water rate structure that customers know and that serves the City well » Rates that fully recover the City Water enterprise’s costs of providing water service
2.2.Agency Overview
The City of Signal Hill’s water department provides water service to a population of over 11,000 residents through about 3,150 metered water connections. The City’s water system consists of:
» Approximately 50 miles of transmission and distribution pipeline; » One water treatment plant;
» One MWD imported water connection;
» Three groundwater production wells;
» Three booster pump stations;
» Three storage reservoirs.
Water supplied to the City comes from various sources, which include water from three groundwater wells, and supplemental water purchases from MWD. The local groundwater supply originates from the San Gabriel mountains, which then flows down the San Gabriel River watershed and makes its way underground into the Central Basin. Current groundwater production and capacity details are as follows:
» Well No. 7: Constructed in 1978, with an initial production capacity of 1,830 GPM. Production has declined to approximately 281 GPM as of FY 2023. The City plans to decommission and replace Well No. 7 within the next three years.
CITY OF SIGNAL HILL
» Well No. 9: Drilled in 2008 but was not brought online until 2018 due to groundwater discoloration issues.
The well was designed with a capacity of 1,200 GPM but currently operates at 650 – 700 GPM. Restoration projects require redrilling and repacking to improve production rates. » Well No. 10: Completed in 2022 as a replacement for Well No. 8. It was designed to produce 1,200 GPM but remains inactive while awaiting final permitting.
Upon the completion and permitting of Well No. 10, local sources will be capable of producing a combined flow of approximately 2,100 GPM and are expected to supply 70.0 percent of the City’s water from FY 2026 onward. The remaining 30.0 percent of supply will be purchased water from MWD.
3.Key Inputs and Estimates
3.1.Key Information Used in this Study
Raftelis developed a financial planning tool in Microsoft Excel to forecast financial calculations over the next 10 fiscal years. Projections in future years are generally made based on actual or estimated data for FY 2023 and the adopted budgets for FY 2024 using other key assumptions outlined below. Future estimates were discussed with, and reviewed by, City staff to ensure that the water system's local and unique characteristics are accurately accounted for.
The Study relies on the following critical information provided by City staff:
1. FY 2023 actual revenues and operating expenses.
2. FY 2024 budgeted revenues and operating expenses.
3. FY 2023 water use and customer account data (billing data detail).
4. Water source of supply production and cost estimates.
5. FY 2024 beginning cash fund balances.
6. A ten-year CIP schedule based on the results of the WMP.
7. Existing debt service obligations and debt coverage covenants.
8. Current and Proposed cash reserve policies
3.2.Current Rates
Current rates were developed as part of the 2019 Water Rate Study. Rates were increased in FY 2020 through FY 2024. Current rates were made effective on January 1, 2024 with no scheduled increase for January of FY 2025. The existing rate structure consists of two components: a fixed monthly service charge by meter size and a variable water usage consumption charge per hundred cubic feet (CCF4
) of water use.
4 One CCF of water is equal to 748 gallons.
WATER RATE STUDY
Table 3-1: Current Monthly Fixed Charges ($/Month)
A B C
Line Meter Size FY 2025
1 5/8" $25.76
2 3/4" $25.76
3 1" $66.30
4 1 1/2" $146.15
5 2" $253.25
6 3" $567.40
7 4" $567.40
8 6" $567.40
9 8" $567.40
10 10" $1,810.06
The City imposes a fixed monthly fire line service charge on properties that are required to install5 a private fire
suppression system as a condition of extending or initiating water service, or where the customer or property owner has installed a private fire line for the purpose of fire protection. The rates for the monthly fire line service charge are established based on the diameter of the fire line serving a property and are calculated to recover the costs associated with fire service capacity in the water distribution system. The current rates for the monthly residential fire service charge for private fire lines are shown in Table 3-2.
Table 3-2: Current Monthly Residential Fire Service Charges ($/Month) A B C
Line Fireline Diameter FY 2025
1 2" $121.79
2 4" $240.77
3 6" $362.01
4 8" $457.02
5 10" $457.02
Table 3-3 shows the City’s current monthly business private fire line charges.
Table 3-3: Current Monthly Business Fire Service Charges ($/Month) A B C
Line Fireline Diameter FY 2025
1 2" $205.95
2 3" $205.95
3 4" $457.02
4 6" $457.02
5 8" $457.02
6 10" $457.02
5 For certain types of land uses and residential construction installation of fire suppression is required by law.
CITY OF SIGNAL HILL
The volumetric component of a customer’s water bill is calculated based on the number of units of water delivered to a property (i.e., metered use), measured in CCF, multiplied by the rate(s) that vary by customer class and tier. The current tier widths and rates are shown in Table 3-4. The rates in Table 3-4, multiplied by the amount of use in each respective tier, determine the volumetric component of a customer’s bill.
Table 3-4: Current Water Usage Rates ($/CCF)
A B C D
Line Class/Tier Monthly Tier
(CCF)
FY 2025
($/CCF)
Residential - Single Family
1 Tier 1 0-15 $4.38
2 Tier 2 >16 $6.99
Residential - Multi-Family
3 Tier 1 0-15 $4.38
4 Tier 2 >16 $6.99
Commercial, Industrial, and Institutional
5 Tier 1 0-15 $4.38
6 Tier 2 16-150 $6.99
7 Tier 3 >151 $10.29
Irrigation
8 Tier 1 0-15 $4.38
9 Tier 2 >16 $6.66
3.3.Escalation Factors
Escalation factors show projected increases in various cost categories across the study period, due to inflation. These factors are applied to all years beginning in FY 2025. Raftelis worked with City staff to escalate individual budget line items from the FY 2024 budget according to appropriate escalation factors. Inflationary assumptions are presented in Table 3-5. For long-term planning purposes, inflationary factors are constant.
General inflation is estimated at 3.0 percent per year based on the long-term change in the US Bureau of Labor Statistics Consumer Price Index-Urban (CPI-U). Salaries and benefits tend to outpace general inflation, and City staff have estimated 5.0 percent annual increases in these categories based on the Bureau of Labor Statistics published percent change in average weekly wages by state for 2024. This inflation factor includes cost of living adjustments and merit-based increases on salaries as well as retirement and insurance related to benefits. Electricity costs reflect the price of electricity for water production, system pumping, and other City energy uses. The City’s long-term CIP is escalated using the 20-year average of the Handy-Whitman Index (HWI) of Public Utility Construction Costs for the Pacific Region of 5.0 percent. Water purchases from MWD are projected to increase 4.0 percent per year from FY 2026 through FY 2030 based on MWD’s projected future rate increases.
To project non-operating revenues, the study assumes that all recurring non-rate (miscellaneous) revenues will remain constant, and that the interest earnings rate on cash reserves will average 2.5 percent per year through FY 2030. The Reserve Interest Rate escalation factor is also presented in Table 3-5.
WATER RATE STUDY
Table 3-5: Escalation Factors
A B C D E F G
Line Escalation Factors FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 1 General Cost Inflation 3.0% 3.0% 3.0% 3.0% 3.0%
2 Salary 5.0% 5.0% 5.0% 5.0% 5.0%
3 Benefits 5.0% 5.0% 5.0% 5.0% 5.0%
4 Utilities 3.0% 3.0% 3.0% 3.0% 3.0%
5 Capital 5.0% 5.0% 5.0% 5.0% 5.0%
6 Water Purchase 4.0% 4.0% 4.0% 4.0% 4.0%
7 Reserve Interest Rate 2.5% 2.5% 2.5% 2.5% 2.5%
3.4.Proposed Reserve Funding
Reserve policies provide guidelines for sound financial management with an overall long-range perspective to maintain financial solvency, mitigate financial risks associated with revenue instability, volatile capital costs and emergencies, and provide routine working capital. These risks may include fiscal emergencies, water shortages, asset failures, and natural disasters among others. The City has adopted reserve policies to meet cash flow needs (operating). The City’s current target reserve balance for the Water Fund is a fixed amount equal to $1.5 million.
Raftelis worked with City staff to evaluate alternative reserve policies to reduce risk by meeting operating cash needs, but also to provide adequate funding of capital repairs and replacements (capital), and to provide an immediate source of funds if more expensive purchased water is required for short periods of time.
The proposed alternative reserve recommends revising the policy to the following:
» Operating Reserve: equal to 90 days of O&M expenses, which equates to approximately $1.5 million on average over the five-year rate-setting period. Unlike the fixed target of $1.5 million, a 90-day operating reserve will naturally adjust over time to reflect changes in operating costs driven by inflationary pressure or cost structure changes.
» Capital Reserve: equal to 50.0 percent (one-half of a year) of the inflation-adjusted 5-year average CIP. This will ensure funding to execute planned capital on time, mitigate any unexpected cost increases, and may provide flexibility on the timing of projects going forward. Like the operating reserve, the capital reserve adjusts over time due to the size of the rolling 5-year CIP and inflationary cost pressure. » Rate Stabilization: equal to 15 percent of annual volumetric (i.e. water use) rate revenues. This reserve provides a buffer for fluctuations in annual groundwater production versus purchased water from MWD.
An additional consideration for the recommended reserve policy is future planned external borrowing. Days cash on hand is one consideration of many for credit rating and creditworthiness. In Raftelis’ experience with Municipal Advisory firms in California, 90 days’ cash represents a minimum level of reserves required to secure external borrowing. The proposed reserve policy achieves, on average, 280 days cash on hand. Table 3-6 shows the proposed reserve targets throughout the rate-setting period. By FY 2030, the proposed cash reserve target will increase to $5.3 million.
CITY OF SIGNAL HILL
Table 3-6: Proposed Cash Reserve Targets
A B D E F G H
Line FY 2026 FY 2027 FY 2028 FY 2029 FY 2030
1 Operating Reserve
2 O&M Expenses $5,841,404 $6,055,457 $6,277,828 $6,508,861 $6,748,913 3 90 Days Cash (of 365 days) 90/365 90/365 90/365 90/365 90/365 4 Annual Operating Reserve Target $1,440,346 $1,493,126 $1,547,958 $1,604,925 $1,664,115 5 Capital Reserve Fund
6 5-Year Average CIP $4,853,045 $4,936,236 $5,309,998 $5,680,326 $6,290,076 7 50% Annual CIP 50.0% 50.0% 50.0% 50.0% 50.0%
8 Water Capital Reserve Fund Target $2,426,522 $2,468,118 $2,654,999 $2,840,163 $3,145,038 9 Rate Stabilization Reserve
10 Current Commodity Rate Revenues $3,871,976 $3,840,922 $3,810,118 $3,779,561 $3,749,249 11 15% of Annual Commodity Rate
Revenues 15.0% 15.0% 15.0% 15.0% 15.0%
12 Rate Stabilization Reserve Target $580,796 $576,138 $571,518 $566,934 $562,387 13 Total Cash Reserve Target $4,447,665 $4,537,383 $4,774,474 $5,012,022 $5,371,541
3.5.Projected Water Demand and Connection Growth
Two primary factors are used to estimate future water demand: account growth from new connections and water demand relative to the most recent year of use, FY 2023. The long-term financial plan projects 0.2 percent annual account growth for all customer classes through the study period based on the Master Plan completed by Dudek.
Water demand has declined from historical levels in the 2000s and 2010s due to improved efficiency, conservation efforts during prior drought cycles, and wet-year rainfall conditions, which depress demand in the short term.
Considering cyclical wet and dry year conditions, annual baseline water demand is projected to gradually decline over the study period, averaging approximately 1,433 acre-feet (AF) in water sales per year. This assumption is based on the most recent three-year average water demand. Actual water sales in FY 2023 of 1,490 AFY were multiplied by the demand factor shown in
WATER RATE STUDY
Table 3-7 for each customer class to achieve projected water use under baseline conditions in FY 2024 and beyond.
CITY OF SIGNAL HILL
Table 3-7: Water Demand Factors
A B C D E F G H I
Line Class FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 1 Account Growth
2 Residential - Single Family 0.2% 0.2% 0.2% 0.2% 0.2% 0.2% 0.2% 3 Residential - Multi-Family 0.2% 0.2% 0.2% 0.2% 0.2% 0.2% 0.2% 4 Commercial, Industrial, and
Institutional 0.2% 0.2% 0.2% 0.2% 0.2% 0.2% 0.2%
5 Irrigation 0.2% 0.2% 0.2% 0.2% 0.2% 0.2% 0.2%
6 Water Usage Factor
7 Residential - Single Family -1.0% -1.0% -1.0% -1.0% -1.0% -1.0% -1.0% 8 Residential - Multi-Family -1.0% -1.0% -1.0% -1.0% -1.0% -1.0% -1.0% 9 Commercial, Industrial, and
Institutional -1.0% -1.0% -1.0% -1.0% -1.0% -1.0% -1.0% 10 Irrigation -1.0% -1.0% -1.0% -1.0% -1.0% -1.0% -1.0% 11 Total Water Demand Factor
12 Residential - Single Family -0.8% -0.8% -0.8% -0.8% -0.8% -0.8% -0.8% 13 Residential - Multi-Family -0.8% -0.8% -0.8% -0.8% -0.8% -0.8% -0.8% 14 Commercial, Industrial, and
Institutional -0.8% -0.8% -0.8% -0.8% -0.8% -0.8% -0.8% 15 Irrigation -0.8% -0.8% -0.8% -0.8% -0.8% -0.8% -0.8% 16 Total Water Sales (CCF) 643,957 638,792 633,669 628,587 623,546 618,545 613,584 17 Total Water Sales (AF) 1,478 1,466 1,455 1,443 1,431 1,420 1,409
WATER RATE STUDY
Table 3-8 shows the estimated new connection growth rate and water sales for the Study period. Account growth is estimated at 0.2 percent per year based on past development and projected growth. The water demand factor represents projected per capita (or per connection) demands, relative to prior year.
The City expects a modest reduction in per capita demand over the planning horizon due to passive conservation activities including the routine replacement of indoor and outdoor fixtures with increasingly more efficient units.
This demand factor assumes a 1.0 percent efficiency gain each year which yields a water demand factor of 99.0 percent (of prior year). For demand forecasting the water use rate considers both new connections and changes in per capita/per connection consumption. Currently, the City's water demand is approximately 17.4 CCF per month, and the single-family residential demand is approximately 7.4 CCF per month.
CITY OF SIGNAL HILL
Table 3-8: Projected Water Connection Growth and Water Demand
A B D E F G H I J K
Actual Projected Projected Projected Projected Projected Projected Projected Line Water Use FY
2023
FY
2024
FY
2025
FY
2026
FY
2027
FY
2028
FY
2029
FY
2030
1 New Connection Growth Rate 0.2% 0.2% 0.2% 0.2% 0.2% 0.2% 0.2% 2 Water Demand Factor 99.0% 99.0% 99.0% 99.0% 99.0% 99.0% 99.0% 3 Water Use Rate Factor 99.2% 99.2% 99.2% 99.2% 99.2% 99.2% 99.2% 4 5 Metered Connections 3,161 3,167 3,174 3,180 3,187 3,193 3,199 3,206 6 Water Use (CCF) 649,163 643,957 638,792 633,669 628,587 623,546 618,545 613,584 Table 3-9 shows the projected number of water connections by meter size, by fiscal year. The number of connections each year changes based on the growth assumptions identified in Table 3-9.
Table 3-9: Projected Number of Water Meters, by Meter Size
A B C D E F G H I J
Line Meter Size FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 1 5/8" 28 28 28 28 28 28 28 29
2 3/4" 1,891 1,895 1,898 1,902 1,906 1,910 1,914 1,917
3 1" 653 655 656 657 658 660 661 662
4 1 1/2" 136 136 136 136 137 137 137 137
5 2" 327 328 329 329 330 331 331 332
6 3" 13 13 13 13 13 13 13 13
7 4" 2 2 2 2 2 2 2 2
6 6" 1 1 1 1 1 1 1 1
7 8" 0 0 0 0 0 0 0 0
8 10" 0 0 0 0 0 0 0 0
9 Total 4,630 4,641 4,652 4,663 4,673 4,684 4,695 4,695 Table 3-10 and Table 3-11 show estimated fire line accounts using the same growth assumptions as metered connections.
Table 3-10: Projected Number of Residential Fire Lines, by Line Size
A B C D E F G H I J
Line Line Size FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 1 2" 24 24 24 24 24 24 24 24
2 4" 4 4 4 4 4 4 4 4
3 6" 9 9 9 9 9 9 9 9
4 8" 0 0 0 0 0 0 0 0
5 10" 0 0 0 0 0 0 0 0
6 Total 37 37 37 37 37 37 38 38
WATER RATE STUDY
Table 3-11: Projected Number of Business Fire Lines, by Line Size
A B C D E F G H I J
Line Line Size FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 1 2" 1 1 1 1 1 1 1 1
2 3" 2 2 2 2 2 2 2 2
3 4" 13 13 13 13 13 13 13 13
4 6" 32 32 32 32 32 32 33 33
5 8" 24 24 24 24 24 24 24 24
6 10" 7 7 7 7 7 7 7 7
7 Total 79 79 80 80 80 80 80 80
Water demand projections through FY 2030 are shown in Table 3-12. The water demand and revenue growth assumptions are identified in
CITY OF SIGNAL HILL
Table 3-7. Column C in Table 3-12 shows the FY 2023 actuals, which are used to project water use, by class, for FY 2024 through FY 2030. For planning purposes, water sales decline 0.8 percent each year (0.2 percent growth plus a negative 1.0 percent efficiency gain per capita), averaging 1,450 feet per year (AFY) through the study period.
Table 3-12: Projected Water Usage by Class and Tier
A B C D E F G H I J
Line Customer Usage (CCF) FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 1 Residential - Single Family
2 Tier 1 130,528 129,481 128,443 127,413 126,391 125,377 124,372 123,374 3 Tier 2 15,228 15,106 14,985 14,865 14,745 14,627 14,510 14,393 4 5 Residential - Multi-Family
6 Tier 1 82,714 82,051 81,393 80,740 80,092 79,450 78,813 78,181 7 Tier 2 115,783 114,854 113,933 113,020 112,113 111,214 110,322 109,437 8 9 Commercial, Industrial, and Institutional
10 Tier 1 64,442 63,925 63,412 62,904 62,399 61,899 61,403 60,910 11 Tier 2 107,003 106,145 105,294 104,449 103,611 102,780 101,956 101,138 12 Tier 3 64,095 63,581 63,071 62,565 62,063 61,566 61,072 60,582 13 14 Irrigation
15 Tier 1 15,292 15,169 15,048 14,927 14,807 14,689 14,571 14,454 16 Tier 2 54,078 53,644 53,214 52,787 52,364 51,944 51,527 51,114 17 18 Total Usage (CCF) 649,163 643,957 638,792 633,669 628,587 623,546 618,545 613,584 19 Total Use (AF) 1,490 1,478 1,466 1,455 1,443 1,431 1,420 1,409
3.6.Projected Water Supply
The high reliance on MWD Imported water in FY 2025 is due to the timing of the well projects occurring that year, which will cause the wells to supply a limited amount of water. The City’s supply mix can vary from year to year.
Simplifying assumptions are necessary to develop reasonable supply mix projections over the study. The best estimate of normal condition supplies is 70 percent groundwater and 30 percent MWD purchases.
Table 3-13 shows the water supply mix projected to meet water demand over the study period. Signal Hill staff provided Raftelis with the anticipated amount of water available from each source of supply over the study period based on groundwater well infrastructure and capacities, operational constraints, and projected customer water use.
Raftelis then determined the projected supply mix based on the amount of water supply required to satisfy demand after water loss (due to physical leakage and apparent losses).
The high reliance on MWD Imported water in FY 2025 is due to the timing of the well projects occurring that year, which will cause the wells to supply a limited amount of water. The City’s supply mix can vary from year to year.
Simplifying assumptions are necessary to develop reasonable supply mix projections over the study. The best estimate of normal condition supplies is 70 percent groundwater and 30 percent MWD purchases.
WATER RATE STUDY
Table 3-13: Projected Water Supply Mix
A B C D E F G H I J
Line Description FY
2023
FY
2024
FY
2025
FY
2026
FY
2027
FY
2028
FY
2029
FY
2030
1 Water Supply Required to Meet Demand
2 Water Demand (AF) 1,490 1,478 1,466 1,455 1,443 1,431 1,420 1,408 3 Water Loss 13.8% 14.1% 14.1% 14.1% 14.1% 14.1% 14.1% 14.1% 4 Required Water Supply (AF)[1] 1,729 1,720 1,706 1,693 1,679 1,666 1,652 1,639 5 Projected Water Supply Mix (%)
6 Wells 50.0% 83.0% 10.0% 70.0% 70.0% 70.0% 70.0% 70.0% 8 MWD Import 50.0% 17.0% 90.0% 30.0% 30.0% 30.0% 30.0% 30.0% 9 Projected Water Supply Mix (AF)
10 Wells 722 1,428 171 1,185 1,175 1,166 1,157 1,147
12 MWD Import 1,006 292 1,536 508 504 500 496 492
13 Total (AF) 1,729 1,720 1,706 1,693 1,679 1,666 1,652 1,639
CITY OF SIGNAL HILL
4.Financial Plan
This section describes the development of the City Water Enterprise’s long-range financial plan. To develop the financial plan, Raftelis projects annual revenues and expenses; models reserve balances; incorporates capital expenditures, debt service, and inflationary pressures; and calculates debt service coverage ratios to estimate the amount of any additional rate revenue required in each year of the study. This section includes a discussion of O&M expenses, the CIP, current and planned future debt service, reserve funding, projected revenue under existing rates, and the revenue adjustments required to ensure the fiscal sustainability and solvency of the Water Enterprise.
Revenue adjustments represent the gross increase in total rate revenues and can be considered the average rate increase for customers. Numbers shown in the tables of this section are rounded. Therefore, hand calculations based on the displayed numbers, such as summing or multiplying, may not equal the exact results shown in this report.
4.1.Factors Affecting Revenue Adjustments
The following four components constitute the City’s revenue requirement and thus its water rates: operating and maintenance (O&M) expenses, CIP, debt service, and reserve funding. Future revenue requirements are influenced by many factors. The primary drivers in this study include:
1. Inflation: Recent inflationary pressure has been higher than experienced in the past 40 years. Utilities have experienced this pressure in costs from chemicals for water treatment, to capital construction, to personnel, and energy. Even in a normal inflationary environment, costs increase at an average rate of approximately 3 percent per year for general goods and services and 4 to 5 percent per year on construction and infrastructure.
2. Changes in Normal-Condition Water Supplies: After a period of reliance on MWD purchases the Water Enterprise will produce significantly more from local supplies. This supply switching will reduce the cost of water supply and represents a savings compared to recent year expenditures.
3. Capital Funding: The WMP has identified a 20-year schedule of CIP including projects like reservoir roof replacement, pipe replacement, and well rehabilitation among others. This CIP has been prioritized by Dudek and City staff and then modified further for incorporation into the Rate Study. Over the next 10 years the Rate Study includes an average of $4.8 million per year in annual CIP (inflation-adjusted).
4. Prudent Reserves: The City's current target reserve balance represents a minimal amount of cash on hand for operating cash flow needs only. This Study recommends revising the policy to include 90 days O&M, a capital reserve, and a rate stabilization reserve. Supplementing the current policy will allow the City to be more financially resilient in emergencies and more capable of executing capital as planned.
4.2.Status Quo Financial Plan – No Revenue Adjustments
4.2.1.REVENUES
Rate revenues consist of Meter Service Charges (which vary by meter size) and variable Water Usage Charges for water use (which vary by class and tier). Current monthly Meter Service Charges are shown in Table 1-1. Private fire service charges are found in Table 1-2 and Table 1-3. The tiered Water Usage Charges and tier widths are shown in Table 1-4. The volumetric component of a customer's water bill is calculated based on the number of units of water delivered to a property, measured in one hundred cubic feet (CCF), multiplied by the Water Usage Charges that vary by customer class and tier. Projected water use by customer class and tier is shown in Table 3-12.
WATER RATE STUDY
The Water Enterprise derives some revenues from non-rate sources. These revenues consist of other operating, miscellaneous, and non-operating revenues and are summarized in Lines 7 – 10. Table 4-1 shows rate revenue and non-rate revenues.
Table 4-1: Projected Water Revenues
A B C D E F G H
Line Revenues FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 1 Rate Revenues
2 Fixed Revenues (Service Charges) $2,971,207 $2,977,150 $2,983,104 $2,989,070 $2,995,049 $3,001,039 3 Variable Revenues (Usage Charges) $3,903,280 $3,871,976 $3,840,922 $3,810,118 $3,779,561 $3,749,249 4 Total Rate Revenue $6,874,487 $6,849,125 $6,824,026 $6,799,188 $6,774,609 $6,750,288 5 6 Non-Rate Revenues
7 Interest Income $251,339 $157,580 $116,843 $88,926 $84,731 $80,385 8 Other Revenue $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 9 Miscellaneous Fees/Charges $39,957 $39,957 $39,957 $39,957 $39,957 $39,957 10 Non-Operating Revenue $42,782 $0 $0 $0 $0 $0
11 Total Revenue $7,218,565 $7,056,662 $6,990,827 $6,938,072 $6,909,298 $6,880,629
4.2.2.OPERATING AND MAINTENANCE (O&M) EXPENSES
Total projected O&M expenses are shown in Table 4-2 and are summarized by department. Expenses are projected from the City’s Adopted FY 2024 budget. Expenses beyond FY 2024 use City estimated costs where known or rely on FY 2024 budgeted values escalated by the inflationary assumptions from Table 3-5. Note that Water Supply Costs utilize estimates of future source of supply mix and unit costs from The high reliance on MWD Imported water in FY 2025 is due to the timing of the well projects occurring that year, which will cause the wells to supply a limited amount of water. The City’s supply mix can vary from year to year.
Simplifying assumptions are necessary to develop reasonable supply mix projections over the study. The best estimate of normal condition supplies is 70 percent groundwater and 30 percent MWD purchases.
Table 3-13.
Table 4-2: Projected O&M Expenses
A B C D E F G H
Line O&M Summary FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 1 Water Operations
2 Salaries and Benefits $1,668,217 $1,786,627 $1,875,959 $1,969,757 $2,068,244 $2,171,657 3 Maintenance and Operations $2,277,489 $2,595,814 $2,673,688 $2,753,899 $2,836,516 $2,921,611 4 Water Supply Costs $2,351,315 $1,350,064 $1,393,119 $1,437,551 $1,483,402 $1,530,718 5 Water Billing Administration
6 Salaries and Benefits $22,628 $23,759 $24,947 $26,194 $27,504 $28,879 7 Maintenance and Operations $82,615 $85,141 $87,744 $90,428 $93,195 $96,047 8 Total O&M Expenses $6,402,263 $5,841,404 $6,055,457 $6,277,828 $6,508,861 $6,748,913
CITY OF SIGNAL HILL
4.2.2.1.Water Supply Costs
Table 4-3 shows the water supply mix projected to meet water demand over the study period. Signal Hill staff provided Raftelis with the anticipated amount of water available from each source of supply over the study period based on groundwater well infrastructure and capacities, operational constraints, and projected customer water use.
Raftelis then determined the projected supply mix based on the amount of water supply required to satisfy demand after water loss (due to physical leakage and apparent losses).
The high reliance on MWD Imported water in FY 2025 is due to the timing of the well projects occurring that year, which will cause the wells to supply a limited amount of water. The City’s supply mix can vary from year to year.
Simplifying assumptions are necessary to develop reasonable supply mix projections over the study. The best estimate of normal condition supplies is 70 percent groundwater and 30 percent MWD purchases.
Table 4-3: Projected Water Supply Mix (Volume)
A B C D E F G H
Line Description FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 1 Water Demand (AF) 1,466 1,455 1,443 1,431 1,420 1,409 2 Water Loss 14.1% 14.1% 14.1% 14.1% 14.1% 14.1%
3 Required Water Supply (AF)[1] 1,706 1,693 1,679 1,666 1,652 1,639 4 Projected Water Supply Mix (%)
5 Wells 10.0% 70.0% 70.0% 70.0% 70.0% 70.0%
6 MWD Import 90.0% 30.0% 30.0% 30.0% 30.0% 30.0%
8 Projected Water Supply Mix (AF)
9 Wells 171 1,185 1,175 1,166 1,157 1,147
10 MWD Import 1,536 508 504 500 496 492
12 Total (AF) 1,706 1,693 1,679 1,666 1,652 1,639
Projected water production and water purchase costs are shown below in
WATER RATE STUDY
Table 4-4. The table shows the costs associated with pumping and purchasing water, specifically groundwater and imported water from MWD. The costs consist of two categories for each water source: 1. fixed charges and 2. volumetric rates, represented in dollars per acre-foot.
For groundwater pumped from the City's wells there is no fixed annual charge. The volumetric rate for groundwater in FY 2025 is $440 per acre-foot, with an annual escalation rate of 4 percent. The fixed rate for imported MWD water is assumed to be $36,169 in FY 2025 and the volumetric rate for MWD water in FY 2025 is $1,459 per acre-foot, which is also increased by 4 percent each year.
To estimate total cost, the table incorporates the projected production mix from Table 4-3, which details the proportion of water sourced from groundwater versus purchased water. The volumetric charges per acre-foot (lines 3 and 6) are multiplied by the respective sources (lines 8 and 9) to calculate the total volumetric costs for each source (lines 13 and 16). Line 17 sums the costs from lines 12 through 16, including the fixed costs.
CITY OF SIGNAL HILL
Table 4-4: Projected Water Production and Purchase Costs ($)
A B C D E F G H
Line FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030
1 Groundwater Production Charges
2 Annual Fixed Charges $0 $0 $0 $0 $0 $0
3 Groundwater Pumping Charge ($/AF) $440 $458 $476 $495 $515 $535 4 MWD Import Charges
5 Annual Fixed Charges $36,169 $37,616 $39,120 $40,685 $42,312 $44,005 6 MWD Import Volumetric Rate ($/AF) $1,459 $1,517 $1,578 $1,641 $1,706 $1,775 7 8 Projected Groundwater Production (AF) 171 1,185 1,175 1,166 1,157 1,147 9 Projected MWD Import (AF) 1,536 508 504 500 496 492
10 11 Groundwater Production Costs
12 Fixed Costs $0 $0 $0 $0 $0 $0
13 Pumping Costs $75,069 $542,116 $559,279 $576,985 $595,252 $614,097 14 MWD Import Costs
15 Fixed Costs $36,169 $37,616 $39,120 $40,685 $42,312 $44,005 16 Volumetric Costs $2,240,077 $770,332 $794,720 $819,880 $845,837 $872,616 17 Total Water Supply Costs $2,351,315 $1,350,064 $1,393,119 $1,437,551 $1,483,402 $1,530,718
4.2.3.CAPITAL IMPROVEMENT PROGRAM
The City has proposed approximately $26.4 million in capital expenditures from FY 2025 to FY 2030. A summary of these capital expenditures is shown in
WATER RATE STUDY
Table 4-5. The full detailed capital improvement plan is shown in Appendix A: Inflated Ten-Year Capital Improvement Plan. Key capital improvement projects include:
» The Gundry Reservoir Roof Replacement and Rehabilitation Project: An inspection in March 2022 found the reservoir roof is failing, requiring a complete replacement and recoating. By late 2024, the reservoir roof and adjacent sand basin's condition has worsened, necessitating immediate action to ensure water quality and structural integrity.
» Asbestos Cement (AC) Replacement Pipeline Replacement: The State Water Board requires the replacement of over 110,000 linear feet of AC pipes with cast iron. » New Well Installation: A new well will allow the city to meet average water demands without depending on imported MWD water.
The capital project costs in
CITY OF SIGNAL HILL
Table 4-5 account for estimated construction cost inflation from Table 3-5. A significant portion of the City’s projected capital expenditures are attributed to pipeline replacement, wells, and storage and reservoir projects.
WATER RATE STUDY
Table 4-5: Projected Capital Improvement Plan (Summary by Type)
A B C D E F G H
Line Capital
Improvement Plan FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 1 Storage $2,100,000 $3,858,750 $0 $0 $382,884 $0
2 Pumping $0 $110,250 $0 $0 $0 $0
3 Treatment $0 $407,925 $497,779 $0 $0 $0
4 Wells $0 $165,375 $1,041,863 $1,255,010 $0 $3,517,751 5 Meters $0 $0 $0 $486,203 $510,513 $0
6 T&D $0 $1,225,980 $2,352,896 $2,470,541 $3,257,734 $2,723,771 7 Total Inflated CIP $2,100,000 $5,768,280 $3,892,537 $4,211,753 $4,151,131 $6,241,522
4.2.4.DEBT SERVICE
The City has four outstanding long-term debt obligations, one of which is retired after FY 2026. The City provided debt service schedules for each obligation. Table 4-6 shows the annual debt service payment obligation for each existing debt instrument for each year of the rate-setting period.
Table 4-6: Existing Annual Debt Service
A B C D E F G H
Line FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030
1 Revenue Bond
2 Principal $530,000 $545,000 $0 $0 $0 $0
3 Interest $42,800 $10,900 $0 $0 $0 $0
4 General Fund Loan
5 Principal $130,611 $132,259 $133,928 $135,618 $137,330 $139,063 6 Interest $78,175 $86,176 $87,427 $43,619 $65,832 $58,879 7 WRD Loan for Well 10 Construction
8 Principal $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 9 Interest $0 $0 $0 $0 $0 $0
10 General Fund Loan
11 Principal $95,000 $95,000 $95,000 $95,000 $95,000 $95,000 12 Interest $47,500 $45,125 $42,750 $40,375 $38,000 $35,625 13 Total Existing Debt Service $1,074,085 $1,064,460 $509,106 $464,612 $486,162 $478,567
4.2.5.STATUS QUO FINANCIAL PLAN CASH FLOW
Table 4-7 shows the City’s financial plan under the status quo (i.e., no rate increase scenario), which includes no revenue adjustments (Line 3) or any proposed revenue bond proceeds to offset rate-funded capital (Line 22).
Revenues (Lines 1-7) are from Table 4-1. O&M expenses (Lines 9-17) are from Table 4-2. Annual debt service (Lines 20-21) is from Table 4-6. Rate funded capital expenditures (Line 22) are from Table 4-11.
While net operating revenue (Line 27) is positive from FY 2025 to FY 2030, net cash flow (Line 25) is negative from FY 2025 to FY 2030. This indicates that the City’s existing revenues are sufficient to fund operating expenses, but not total costs inclusive of debt service and capital improvement expenses.
CITY OF SIGNAL HILL
Table 4-7: Status Quo Financial Plan
A B C D E F G H
Line FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030
1 Revenues
2 Water Sales and Service Charges $6,874,487 $6,849,125 $6,824,026 $6,799,188 $6,774,609 $6,750,288 3 Revenue Adjustments $0 $0 $0 $0 $0 $0
4 Other Operating Revenue $49,957 $49,957 $49,957 $49,957 $49,957 $49,957 5 Interest Income $251,339 $109,153 $0 $0 $0 $0
6 Transfers In $42,782 $0 $0 $0 $0 $0
7 Total – Revenues $7,218,565 $7,008,235 $6,873,984 $6,849,146 $6,824,567 $6,800,245 8 9 O&M Expenses
10 Water Operations
11 Salaries and Benefits $1,668,217 $1,786,627 $1,875,959 $1,969,757 $2,068,244 $2,171,657 12 Maintenance and Operations $2,277,489 $2,595,814 $2,673,688 $2,753,899 $2,836,516 $2,921,611 13 Water Supply Costs $2,351,315 $1,350,064 $1,393,119 $1,437,551 $1,483,402 $1,530,718 14 Water Billing Administration
15 Salaries and Benefits $22,628 $23,759 $24,947 $26,194 $27,504 $28,879 16 Maintenance and Operations $82,615 $85,141 $87,744 $90,428 $93,195 $96,047 17 Total - O&M Expenses $6,402,263 $5,841,404 $6,055,457 $6,277,828 $6,508,861 $6,748,913 18 19 Debt and Capital
20 Existing Debt Service $1,074,085 $1,064,460 $509,106 $464,612 $486,162 $478,567 21 Proposed Debt Service $0 $0 $0 $0 $0 $0
22 Rate Funded Capital $2,100,000 $5,768,280 $3,892,537 $4,211,753 $4,151,131 $6,241,522 23 Total - Debt and Capital $3,174,085 $6,832,740 $4,401,643 $4,676,366 $4,637,293 $6,720,089 24 25 Net Cash Flow -$2,357,784 -$5,665,909 -$3,583,116 -$4,105,049 -$4,321,587 -$6,668,757 26 27 Net Operating Revenue $816,302 $1,166,831 $818,526 $571,317 $315,706 $51,332 28 Calculated Debt Coverage6 107% 165% 546% 381% 210% 34% 29 Target Debt Coverage 125% 125% 125% 125% 125% 125%
4.2.6.STATUS QUO UNRESTRICTED CASH BALANCE PROJECTIONS
6 The calculated debt service coverage ratio excludes General Fund loan obligations.
WATER RATE STUDY
Table 4-8 shows the City’s fund balances under the status quo scenario. Without additional revenue the fund balances are just above the existing reserve target level of $1.5 million starting in FY 2026 (Column D, Line 21). The City’s funds are depleted by the end FY 2027 (Column E, Line 19) and fall below zero.
CITY OF SIGNAL HILL
Table 4-8: Unrestricted Cash Balances – Status Quo Financial Plan
A B C D E F G H
Line Water Fund Balances FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 1 Beginning Balance $9,556,849 $7,199,066 $1,533,157 -$2,049,960 -$6,155,008 -$10,476,596 2 3 Sources of Funds
4 Rate Revenues $6,874,487 $6,849,125 $6,824,026 $6,799,188 $6,774,609 $6,750,288 5 Revenue Adjustments $0 $0 $0 $0 $0 $0
6 Miscellaneous Revenue $92,739 $49,957 $49,957 $49,957 $49,957 $49,957 7 Interest Income $251,339 $109,153 $0 $0 $0 $0
8 Total - Sources of Funds $7,218,565 $7,008,235 $6,873,984 $6,849,146 $6,824,567 $6,800,245 9 10 Uses of Funds
11 Water Operations O&M $3,945,706 $4,382,441 $4,549,647 $4,723,656 $4,904,760 $5,093,268 12 Water Supply Costs $2,351,315 $1,350,064 $1,393,119 $1,437,551 $1,483,402 $1,530,718 13 Water Billing Administration
O&M $105,243 $108,900 $112,691 $116,622 $120,699 $124,926 14 Existing Debt $1,074,085 $1,064,460 $509,106 $464,612 $486,162 $478,567 15 Proposed Debt Service $0 $0 $0 $0 $0 $0
16 Rate Funded Capital $2,100,000 $5,768,280 $3,892,537 $4,211,753 $4,151,131 $6,241,522 17 Total - Uses of Funds $9,576,349 $12,674,144 $10,457,100 $10,954,194 $11,146,154 $13,469,002 18 19 Ending Balance $7,199,066 $1,533,157 -$2,049,960 -$6,155,008 -$10,476,596 -$17,145,353 20 Proposed Reserve Target $4,176,502 $4,447,665 $4,537,383 $4,774,474 $5,012,022 $5,371,541 21 Over/(Under) Reserve Target $3,022,563 -$2,914,508 -$6,587,342 -$10,929,482 -$15,488,618 -$22,516,894
4.3.Proposed Financial Plan
4.3.1.FINANCIAL PLAN ADJUSTMENTS
WATER RATE STUDY
Table 4-9 displays the proposed revenue adjustments for the recommended financial plan. The financial plan shows projected revenue adjustments for FY 2025 through FY 2030 rate adoption period is five years. The current financial plan shows that revenue adjustments are required to adequately fund all current and projected O&M expenses, debt obligations, capital reinvestment, and achieve reserve policy targets.
CITY OF SIGNAL HILL
Table 4-9: Recommended Revenue Adjustments
A B C D E
Line Fiscal Year Effective
Month
Proposed
Revenue
Adjustment
Proposed
Borrowing
1 FY 2026 July 15.0% $3.0M7
2 FY 2027 July 15.0%
3 FY 2028 July 14.0%
4 FY 2029 July 14.0%
5 FY 2030 July 10.0%
4.3.2. EXISTING AND PROPOSED DEBT SERVICE
The City has four outstanding long-term debt obligations. The proposed financial plan also assumes a $3 million loan from the City’s General Fund as a bridge loan for the Gundry Reservoir Roof Replacement project. The City provided debt service schedules for each existing obligation (lines 1 through 12). Table 4-6 shows the annual debt service payment obligation for each debt instrument for FY 2025 and each year of the rate-setting period.
Table 4-10: Existing and Proposed Future Annual Debt Service
A B C C D E F G
Line Description FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 1 Revenue Bond
2 Principal $530,000 $545,000 $0 $0 $0 $0
3 Interest $42,800 $10,900 $0 $0 $0 $0
4 General Fund Loan
5 Principal $130,611 $132,259 $133,928 $135,618 $137,330 $139,063 6 Interest $78,175 $86,176 $87,427 $43,619 $65,832 $58,879 7 WRD Loan for Well 10 Construction
8 Principal $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 9 Interest $0 $0 $0 $0 $0 $0
10 General Fund Loan
11 Principal $95,000 $95,000 $95,000 $95,000 $95,000 $95,000 12 Interest $47,500 $45,125 $42,750 $40,375 $38,000 $35,625 13 Proposed FY 2025 General Fund Loan
14 Principal $111,647 $114,997 $118,446 $122,000 $125,660 $129,430 15 Interest $90,000 $86,651 $83,201 $79,647 $75,987 $72,218 16 Total Existing and Proposed Debt Service $1,275,732 $1,266,107 $710,753 $666,260 $687,809 $680,214
4.3.3.CAPITAL FINANCING PLAN
Table 4-11 shows the capital financing plan for the study period. Storage projects are funded with a mix of a loan from the General Fund and rate revenues, while the rest of the capital improvement plan will be funded through rate revenue and reserves.
7 The $3,000,000 loan proceed is a General Fund bridge loan for the Gundry Reservoir Roof project.
WATER RATE STUDY
Table 4-11: Capital Financing Plan
A B C D E F G H
Line Capital Financing
Plan FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030
1 Rate Funded $2,100,000 $2,768,280 $3,892,537 $4,211,753 $4,151,131 $6,241,522 2 Debt Funded $0 $3,000,000 $0 $0 $0 $0
3 Total $2,100,000 $5,768,280 $3,892,537 $4,211,753 $4,151,131 $6,241,522
4.3.4.PROPOSED FINANCIAL PLAN
The revenue adjustments detailed in
CITY OF SIGNAL HILL
Table 4-9 allow for full funding of all operating expenses and capital expenditures, and achieve reserve policy targets within the 10-year planning period. Total revenue adjustments (Line 3) are equal to the sum of annual revenue adjustments (
WATER RATE STUDY
Table 4-9) for each year. Although net cash flow (Line 25) is negative each year apart from FY 2029 (Column G), the utility is able to draw on existing reserves to fund operations and capital improvements.
CITY OF SIGNAL HILL
Table 4-12: Proposed Financial Plan
A B C D E F G H
Line FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030
1 Revenues
2 Water Sales and Service Charges $6,874,487 $6,849,125 $6,824,026 $6,799,188 $6,774,609 $6,750,288 3 Revenue Adjustments $0 $1,027,369 $2,200,749 $3,451,608 $4,869,054 $6,011,759 4 Other Operating Revenue $49,957 $49,957 $49,957 $49,957 $49,957 $49,957 5 Interest Income $251,339 $157,580 $116,843 $88,926 $84,731 $80,385 6 Transfers In $42,782 $0 $0 $0 $0 $0
7 Total - Revenues $7,218,565 $8,084,031 $9,191,575 $10,389,680 $11,778,352 $12,892,389 8 9 O&M Expenses
10 Water Operations
11 Salaries and Benefits $1,668,217 $1,786,627 $1,875,959 $1,969,757 $2,068,244 $2,171,657 12 Maintenance and Operations $2,277,489 $2,595,814 $2,673,688 $2,753,899 $2,836,516 $2,921,611 13 Water Supply Costs $2,351,315 $1,350,064 $1,393,119 $1,437,551 $1,483,402 $1,530,718 14 Water Billing Administration
15 Salaries and Benefits $22,628 $23,759 $24,947 $26,194 $27,504 $28,879 16 Maintenance and Operations $82,615 $85,141 $87,744 $90,428 $93,195 $96,047 17 Total - O&M Expenses $6,402,263 $5,841,404 $6,055,457 $6,277,828 $6,508,861 $6,748,913 18 19 Debt and Capital
20 Existing Debt Service $1,074,085 $1,064,460 $509,106 $464,612 $486,162 $478,567 21 Proposed Debt Service $0 $201,647 $201,647 $201,647 $201,647 $201,647 22 Rate Funded Capital $2,100,000 $2,768,280 $3,892,537 $4,211,753 $4,151,131 $6,241,522 23 Total - Debt and Capital $3,174,085 $4,034,387 $4,603,290 $4,878,013 $4,838,940 $6,921,736 24 25 Net Cash Flow -$2,357,784 -$1,791,761 -$1,467,172 -$766,161 $430,551 -$778,260 26 27 Net Operating Revenue $816,302 $2,242,626 $3,136,118 $4,111,852 $5,269,491 $6,143,476 28 Calculated Debt Coverage8 107% 360% 1518% 2151% 2883% 3457% 29 Target Debt Coverage 125% 125% 125% 125% 125% 125%
4.3.5.PROPOSED RESERVE FUNDING
Reserve policies guide sound financial management by maintaining solvency, mitigating financial risks, and providing routine working capital. The City's existing fixed reserve balance of $1.5 million is recommended to be revised to 90 days of O&M expenses, plus additional reserves for capital and rate stabilization, as mentioned in Section 3.4. This approach ensures preparedness for emergencies and financial stability, with a targeted reserve increase from $4.2 million in FY 2025 to $5.3 million by FY 2030, as shown in Table 4-13.
The proposed alternative reserve recommends revising the policy to the following:
8 The calculated debt service coverage ratio excludes General Fund loan obligations.
WATER RATE STUDY
» Operating Reserve: equal to 90 days of O&M expenses, which equates to approximately $1.5 million on average over the five-year rate-setting period. Unlike the fixed target of $1.5 million, a 90-day operating reserve will naturally adjust over time to reflect changes in operating costs driven by inflationary pressure or cost structure changes.
» Capital Reserve: equal to 50.0 percent (one-half of a year) of the inflation-adjusted 5-year average CIP. This will ensure funding to execute planned capital on time, mitigate any unexpected cost increases, and may provide flexibility on the timing of projects going forward. Like the operating reserve, the capital reserve adjusts over time due to the size of the rolling 5-year CIP and inflationary cost pressure. » Rate Stabilization: equal to 15 percent of annual volumetric (i.e. water use) rate revenues. This reserve provides a buffer for fluctuations in annual groundwater production versus purchased water from MWD.
Table 4-13: Proposed Cash Reserve Targets
A B C D E F G H
Line FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030
1 Operating Reserve
2 O&M Expenses $6,402,263 $5,841,404 $6,055,457 $6,277,828 $6,508,861 $6,748,913 3 90 Days Cash (of 365 days) 90/365 90/365 90/365 90/365 90/365 90/365 4 Annual Operating Reserve Target $1,578,640 $1,440,346 $1,493,126 $1,547,958 $1,604,925 $1,664,115 5 Capital Reserve Fund
6 5-Year Average CIP $4,024,740 $4,853,045 $4,936,236 $5,309,998 $5,680,326 $6,290,076 7 50% Annual CIP 50.0% 50.0% 50.0% 50.0% 50.0% 50.0%
8 Water Capital Reserve Fund Target $2,012,370 $2,426,522 $2,468,118 $2,654,999 $2,840,163 $3,145,038 9 Rate Stabilization Reserve
10 Current Commodity Rate Revenues $3,903,280 $3,871,976 $3,840,922 $3,810,118 $3,779,561 $3,749,249 11 15% of Annual Commodity Rate Revenues 15.0% 15.0% 15.0% 15.0% 15.0% 15.0% 12 Rate Stabilization Reserve Target $585,492 $580,796 $576,138 $571,518 $566,934 $562,387 13 Total Cash Reserve Target $4,176,502 $4,447,665 $4,537,383 $4,774,474 $5,012,022 $5,371,541
4.3.6.UNRESTRICTED CASH BALANCE PROJECTIONS
CITY OF SIGNAL HILL
Table 4-14 shows the City Water Fund’s projected cash balances, with the proposed revenue adjustments from
WATER RATE STUDY
Table 1-5. The projected ending balance drops below the proposed reserve funding target mentioned in Section
4.3.5, but remains above the minimum target of ~$1.5 million (approximately 90 days O&M) and reaches the full reserve target by FY 2034 as shown in Figure 4-3. Foregoing achieving the reserve targets in all years allows the City to mitigate otherwise larger rate increases.
CITY OF SIGNAL HILL
Table 4-14: Unrestricted Cash Balances - Proposed Financial Plan
A B C D E F G H
Line Water Fund Balances FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 1 Beginning Balance $9,556,849 $7,199,066 $5,407,305 $3,940,133 $3,173,972 $3,604,523 2 3 Sources of Funds
4 Rate Revenues $6,874,487 $6,849,125 $6,824,026 $6,799,188 $6,774,609 $6,750,288 5 Revenue Adjustments $0 $1,027,369 $2,200,749 $3,451,608 $4,869,054 $6,011,759 6 Miscellaneous Revenue $92,739 $49,957 $49,957 $49,957 $49,957 $49,957 7 Interest Income $251,339 $157,580 $116,843 $88,926 $84,731 $80,385 8 Total - Sources of Funds $7,218,565 $8,084,031 $9,191,575 $10,389,680 $11,778,352 $12,892,389 9 10 Uses of Funds
11 Water Operations O&M $3,945,706 $4,382,441 $4,549,647 $4,723,656 $4,904,760 $5,093,268 12 Water Supply Costs $2,351,315 $1,350,064 $1,393,119 $1,437,551 $1,483,402 $1,530,718 13 Water Billing Administration
O&M $105,243 $108,900 $112,691 $116,622 $120,699 $124,926 14 Existing Debt $1,074,085 $1,064,460 $509,106 $464,612 $486,162 $478,567 15 Proposed Debt Service $0 $201,647 $201,647 $201,647 $201,647 $201,647 16 Rate Funded Capital $2,100,000 $2,768,280 $3,892,537 $4,211,753 $4,151,131 $6,241,522 17 Total - Uses of Funds $9,576,349 $9,875,792 $10,658,747 $11,155,841 $11,347,801 $13,670,649 18 19 Ending Balance $7,199,066 $5,407,305 $3,940,133 $3,173,972 $3,604,523 $2,826,263 20 Proposed Reserve Target $4,176,502 $4,447,665 $4,537,383 $4,774,474 $5,012,022 $5,371,541 21 Over/(Under) Reserve Target $3,022,563 $959,640 -$597,249 -$1,600,502 -$1,407,499 -$2,545,278 Figure 4-1 through Figure 4-4 display the proposed financial plan in graphical format through FY 2035.
Figure 4-1 shows the target debt coverage requirement as the dotted line and the standard debt coverage as the blue line. The figures show the full 10-year financial plan which includes the five years for rate adoption (FY 2026-2030) as well as years six to ten (FY 2031-2035) for planning purposes. With the proposed financial plan, the City is projected to exceed its target coverage requirement in all plan years.
WATER RATE STUDY
Figure 4-1: Projected Debt Coverage
Figure 4-2 illustrates the proposed Operating Financial Plan. It compares existing and proposed revenues with projected expenses. The expenses (bars) represent O&M expenses, water production costs, other operating expenses, rate-funded capital costs, and net cash to/from reserves (i.e. “Reserve Funding”). Total revenues at existing and proposed rates are shown by the solid and dotted lines respectively. Figure 4-2 shows that current revenue from existing rates will not fully recover future total expenses.
Figure 4-2: Proposed Operating Financial Plan
Figure 4-3 shows the Water Fund’s projected ending cash balance by fiscal year. The green bars indicate the projected ending balance, while the dotted and solid black lines indicate the existing and proposed target balances, respectively.
With the proposed financial plan, the City achieves the proposed target fund balance in FY 2034. 0%
2000%
4000%
6000%
8000%
10000%
12000%
FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 FY 2035 Excluding General Fund Debt Service Required
$0
$2
$4
$6
$8
$10
$12
$14
$16
$18
$20
FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 FY 2035 Millions
Water Supply Costs O&M Expenses Debt Service Capital Projects Reserve Funding Current Revenues Proposed Revenues
CITY OF SIGNAL HILL
Figure 4-3: Projected Ending Fund Balances
Figure 4-4 shows the annual planned CIP by funding source. The dark blue bars represent debt-funded (in this case, General Fund-loaned) capital and the light blue bars indicate rate-funded capital on a pay-as-you-go (PAYGO) cash basis.
Figure 4-4: Proposed Capital Improvement Program and Funding $7.2
$5.4
$3.9
$3.2 $3.6
$2.8 $2.7
$3.6
$5.1
$6.2
$9.6
$0
$2
$4
$6
$8
$10
$12
FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 FY 2035 Millions
Ending Balance Proposed Reserve Target Current Reserve Target $2.1 $2.8
$3.9 $4.2 $4.2
$6.2 $6.2 $5.8 $6.1
$7.2
$6.0
$3.0
$0
$1
$2
$3
$4
$5
$6
$7
$8
FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 FY 2035 Millions
Rate Funded Debt Funded
WATER RATE STUDY
5.Proposed Rates
This section calculates the proposed rates based on the financial plan results in the previous section. The proposed revenue adjustments are applied across-the-board to the existing rates and rate structure. The first year of rates is proposed for implementation FY 2026 (July 1, 2025).
5.1.Monthly Meter Service Charges
The City will maintain the current schedule of Meter Service Charges by meter size for all customers. Table 5-1 shows the proposed schedule of rates by meter size for the five-year rate-setting period. The charges incorporate the proposed annual rate increases across all meter sizes for each year, beginning in FY 2026. All rates are rounded to the nearest whole penny.
Table 5-1: Current and Proposed Monthly Meter Service Charges
A B C D E F G H
Line Meter Size FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 1 5/8" $25.76 $29.62 $34.07 $38.84 $44.27 $48.70
2 3/4" $25.76 $29.62 $34.07 $38.84 $44.27 $48.70
3 1" $66.30 $76.25 $87.68 $99.96 $113.95 $125.35
4 1 1/2" $146.15 $168.07 $193.28 $220.34 $251.19 $276.31 5 2" $253.25 $291.24 $334.92 $381.81 $435.27 $478.79
6 3" $567.40 $652.51 $750.39 $855.44 $975.20 $1,072.72
7 4" $567.40 $652.51 $750.39 $855.44 $975.20 $1,072.72
8 6" $567.40 $652.51 $750.39 $855.44 $975.20 $1,072.72
9 8" $567.40 $652.51 $750.39 $855.44 $975.20 $1,072.72
10 10" $1,810.06 $2,081.57 $2,393.80 $2,728.94 $3,110.99 $3,422.09
5.2.Fire Service Charges
Table 5-2 and Table 5-3 show the proposed Fire Service Charges for the study period for those connections to the system that have a dedicated private fireline. All rates are increased by the proposed revenue adjustments and are rounded to the nearest penny.
Table 5-2: Current and Proposed Residential Fire Service Charges
A B C D E F G H
Line Fireline Diameter FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 1 2" $121.79 $140.06 $161.07 $183.62 $209.32 $230.26
2 4" $240.77 $276.89 $318.42 $363.00 $413.82 $455.20
3 6" $362.01 $416.31 $478.76 $545.78 $622.19 $684.41
4 8" $457.02 $525.57 $604.41 $689.03 $785.49 $864.04
5 10" $457.02 $525.57 $604.41 $689.03 $785.49 $864.04
CITY OF SIGNAL HILL
Table 5-3: Current and Proposed Commercial Fire Service Charges
A B C D E F G H
Line Fireline Diameter FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 1 2" $205.95 $236.84 $272.37 $310.50 $353.97 $389.37
2 3" $205.95 $236.84 $272.37 $310.50 $353.97 $389.37
3 4" $457.02 $525.57 $604.41 $689.03 $785.49 $864.04
4 6" $457.02 $525.57 $604.41 $689.03 $785.49 $864.04
5 8" $457.02 $525.57 $604.41 $689.03 $785.49 $864.04
6 10" $457.02 $525.57 $604.41 $689.03 $785.49 $864.04
5.3.Consumption Charges
The City will maintain the current structure and schedule of Water Use Charges by class and tier for Residential, Commercial, and Irrigation customers. Table 5-4. shows the five-year Water Usage Charges by customer class and tier. The charges incorporate the proposed annual revenue adjustments across all rates, beginning in FY 2026. All rates are shown in dollars per hundred cubic feet of water consumed ($/CCF). All rates are rounded to the nearest whole penny.
Table 5-4: Current and Proposed Consumption Charges ($/CCF)
A B C D E F G H I
Line Class/Tier Monthly Tier (CCF) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 1 Residential - Single Family
2 Tier 1 0-15 $4.38 $5.04 $5.80 $6.61 $7.54 $8.29
3 Tier 2 >15 $6.99 $8.04 $9.25 $10.55 $12.03 $13.23
4 5 Residential - Multi-Family
6 Tier 1 0-15 $4.38 $5.04 $5.80 $6.61 $7.54 $8.29
7 Tier 2 >15 $6.99 $8.04 $9.25 $10.55 $12.03 $13.23
8 9 Commercial, Industrial, and Institutional
10 Tier 1 0-15 $4.38 $5.04 $5.80 $6.61 $7.54 $8.29
11 Tier 2 15-150 $6.99 $8.04 $9.25 $10.55 $12.03 $13.23 12 Tier 3 >150 $10.29 $11.83 $13.60 $15.50 $17.67 $19.44 13 14 Irrigation
15 Tier 1 0-15 $4.38 $5.04 $5.80 $6.61 $7.54 $8.29
16 Tier 2 >15 $6.66 $7.66 $8.81 $10.04 $11.45 $12.60
56 CITY OF SIGNAL HILL
6.Customer Bill Impacts
6.1.Monthly Water Bill Impacts
Figure 6-1 shows sample monthly water bills for single-family residential customers with a 3/4-inch water meter at varying levels of water use under both current rates and proposed FY 2026 rates. Approximately 82.0 percent of single-family residential customers have a 3/4-inch water meter. The five water use levels shown are defined in Table 6-1, and were calculated based on account-level single-family residential (SFR) water billing data for FY 2023. At proposed rates, the median water user at 6 CCF would anticipate a $7.81 monthly bill impact. Note that bill impacts vary based on both the volume of water use and the size of the metered connection.
Figure 6-1: Single Family Residential Monthly Water Bill Impacts (FY 2023) Table 6-1: FY 2023 Water Use per Account - Single Family Residential Single-Family Residential
Water Use CCF/Month
10th Percentile 2 CCF
30th Percentile 4 CCF
50th Percentile (Median) 6 CCF
70th Percentile 9 CCF
90th Percentile 15 CCF
Figure 6-2 shows sample monthly water bills for commercial, industrial, and institutional (CII) customers with a 3/4-inch water meter at varying levels of water use under both current rates and proposed FY 2026 rates. The five water use levels shown are defined in Table 6-2, and were calculated based on account-level CII water billing data for FY 2023.
Very Low - 2 ccf Low - 4 ccf Medium - 6 ccf High - 9 ccf Very High - 15 ccf
Current Bill $34.52 $43.28 $52.04 $65.18 $91.46
Proposed Bill $39.70 $49.77 $59.85 $74.96 $105.18
Impact ($) $5.18 $6.49 $7.81 $9.78 $13.72
$0
$20
$40
$60
$80
$100
$120
CITY OF SIGNAL HILL
Figure 6-2: Commercial Monthly Water Bill Impacts (FY 2023) Table 6-2: FY 2023 Water Use per Account - CII
CII
Water Use CCF/Month
10th Percentile 1 CCF
30th Percentile 2 CCF
50th Percentile (Median) 6 CCF
70th Percentile 16 CCF
90th Percentile 59 CCF
Very Low - 1
ccf Low - 2 ccf Average - 6
ccf High - 16 ccf Very High -
59 ccf
Current Bill $30.14 $34.52 $52.04 $98.45 $399.02
Proposed Bill $34.66 $39.70 $59.85 $113.22 $458.87
Impact ($) $4.52 $5.18 $7.81 $14.77 $59.85
$0
$50
$100
$150
$200
$250
$300
$350
$400
$450
$500
58 CITY OF SIGNAL HILL
7.Appendix A: Inflated Ten-Year Capital
Improvement Plan
8.Appendix B: Ten-Year Enterprise
Financial Plan
Raftelis evaluated proposed financial plan options with City staff based on a ten-year planning horizon through FY 2035. Because the proposed water rate schedule presented in this report is for the next five fiscal years only, financial plan results shown in Section 4.2 only extend through FY 2030 for display purposes and to improve clarity. Appendix B provides a ten-year Water enterprise financial plan projection as a supplement. Note that all revenue
A B CD E F G H I J K L M N O
Line Project Description Priority FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 FY 2035 Total 1 Gundry reservoir roof replacement and coating High $2,100,000 $3,858,750 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,958,750 2 Electrical upgrades at Hilltop PS High $0 $110,250 $0 $0 $0 $0 $0 $0 $0 $0 $0 $110,2503 SCADA upgrades High $0 $77,175 $497,779 $0 $0 $0 $0 $0 $0 $0 $0 $574,9544 Well 9 - Rehab High $0 $165,375 $173,644 $0 $0 $0 $0 $0 $0 $0 $0 $339,0195 Rehab of Well 7 High $0 $0 $868,219 $911,630 $0 $0 $0 $0 $0 $0 $0 $1,779,8486 New well installation High $0 $0 $0 $319,070 $0 $3,517,751 $3,324,275 $0 $0 $0 $0 $7,161,0967 Automated Meter Reading (AMR) Medium $0 $0 $0 $486,203 $510,513 $0 $0 $0 $0 $0 $0 $996,7158 Temple reservoir soil removal / upgrades Medium $0 $0 $0 $0 $382,884 $0 $0 $0 $0 $0 $0 $382,8849 Gundry pump station rehabilitation Medium $0 $0 $0 $0 $0 $0 $0 $1,393,220 $0 $0 $0 $1,393,220 10 Disinfection improvements at Gundry Medium $0 $330,750 $0 $0 $0 $0 $0 $0 $0 $0 $0 $330,75011 Lakewood water line by-pass Medium $0 $0 $0 $0 $663,666 $0 $0 $0 $0 $0 $0 $663,66612 Well 9 Treatment Bypass Medium $0 $0 $0 $0 $0 $0 $0 $1,365,169 $2,910,292 $0 $0 $4,275,46113 Valve replacement Medium $0 $385,875 $578,813 $607,753 $638,141 $670,048 $703,550 $738,728 $775,664 $814,447 $855,170 $6,768,18814 Cast iron/asbestos cement pipeline replacement Medium $0 $840,105 $1,774,083 $1,862,788 $1,955,927 $2,053,723 $2,156,410 $2,264,230 $2,377,442 $2,496,314 $2,621,129 $20,402,150 15 Site security for Well 10 Medium $0 $0 $0 $24,310 $0 $0 $0 $0 $0 $0 $0 $24,31016 Upsize pipelines on hydrants that do not meet fireflow requirements
Medium $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,889,120 $0 $3,889,120 17 Gundry Reservoir Treatment Enhancement Low $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $018 Rehab MWD connection to Hilltop Low $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,453,788 $1,453,78819 Temple reservoir expansion Low $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $020 Hilltop Disinfection Station Low $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,111,721 $1,111,72121 Total Capital Projects - Inflated $2,100,000 $5,768,280 $3,892,537 $4,211,753 $4,151,131 $6,241,522 $6,184,234 $5,761,346 $6,063,397 $7,199,881 $6,041,808 $57,615,891
CITY OF SIGNAL HILL
adjustments shown below beyond FY 2030 are for planning purposes only and will be revisited during the next rate study (to establish proposed water rates beyond FY 2030). The ten-year financial projections are based on the same set of assumptions as the five-year financial projections and are based on the best data available at the time of this Study. Assumptions become less reliable and more uncertain over an extended time horizon and new and refined data becomes available; additionally Proposition 218 only allows agencies to adopt and implement rates for a maximum period of five years. Actual revenue requirements for fiscal years beyond FY 2030 will be determined in the next five-year rate study. Depending on actual revenues and expenses incurred during this five-year rate setting period, projected revenue increases in years 6-10 year may vary from today’s estimates. Items which will impact years 6-10 include future water supply and demand conditions, actual capital costs incurred, actual cost inflation, and future debt terms on any future external borrowing.
Table 8-1: Ten-Year Water Financial Plan Assumptions
Line Fiscal Year Revenue Adjustment Proposed Debt Issuance 1 FY 2026 15.0% $3,000,0009
2 FY 2027 15.0% $0
3 FY 2028 14.0% $0
4 FY 2029 14.0% $0
5 FY 2030 10.0% $0
6 FY 2031 7.0% $0
7 FY 2032 7.0% $0
8 FY 2033 7.0% $0
9 FY 2034 7.0% $0
10 FY 2035 7.0% $0
9 The $3,000,000 loan proceed is a General Fund bridge loan for the Gundry Reservoir Roof project. 60 CITY OF SIGNAL HILL
Table 8-2: Ten-Year Water Enterprise Financial Plan
A B C D E F H H I J K L M
Line FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 FY 2035 1 Revenues
2 Water Sales and Service Charges $6,874,487 $6,849,125 $6,824,026 $6,799,188 $6,774,609 $6,750,288 $6,726,221 $6,702,407 $6,678,844 $6,655,531 $6,723,407 3 Revenue Adjustments $0 $1,027,369 $2,200,749 $3,451,608 $4,869,054 $6,011,759 $6,880,484 $7,805,221 $8,789,746 $9,838,086 $11,104,747 4 Total Water Rate Revenue $6,874,487 $7,876,494 $9,024,775 $10,250,797 $11,643,664 $12,762,047 $13,606,705 $14,507,628 $15,468,590 $16,493,617 $17,828,154 5 6 Connection Charges $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 7 Other Operating Revenue $49,957 $49,957 $49,957 $49,957 $49,957 $49,957 $49,957 $49,957 $49,957 $49,957 $49,957 8 Interest Income $251,339 $157,580 $116,843 $88,926 $84,731 $80,385 $69,039 $79,335 $108,969 $141,426 $198,684 9 10 Non-Operating Revenue $42,782 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 11 Total - Revenues $7,218,565 $8,084,031 $9,191,575 $10,389,680 $11,778,352 $12,892,389 $13,725,700 $14,636,920 $15,627,516 $16,685,000 $18,076,796 12 13 O&M Expenses
14 Water Operations
15 Salaries and Benefits $1,668,217 $1,786,627 $1,875,959 $1,969,757 $2,068,244 $2,171,657 $2,280,240 $2,394,251 $2,513,964 $2,639,662 $2,771,645 16 Maintenance and Operations $2,277,489 $2,595,814 $2,673,688 $2,753,899 $2,836,516 $2,921,611 $3,009,260 $3,099,538 $3,192,524 $3,288,299 $3,386,948 17 Water Supply Costs $2,351,315 $1,350,064 $1,393,119 $1,437,551 $1,483,402 $1,530,718 $1,579,546 $1,629,935 $1,681,935 $1,735,596 $1,834,848 18 Water Billing Administration
19 Salaries and Benefits $22,628 $23,759 $24,947 $26,194 $27,504 $28,879 $30,323 $31,839 $33,431 $35,103 $36,858 20 Maintenance and Operations $82,615 $85,141 $87,744 $90,428 $93,195 $96,047 $98,988 $102,021 $105,147 $108,370 $111,694 21 Total - O&M Expenses $6,402,263 $5,841,404 $6,055,457 $6,277,828 $6,508,861 $6,748,913 $6,998,357 $7,257,584 $7,527,001 $7,807,031 $8,141,994 22 23 Net Revenue (excluding Debt) $816,302 $2,242,626 $3,136,118 $4,111,852 $5,269,491 $6,143,476 $6,727,343 $7,379,336 $8,100,516 $8,877,969 $9,934,802 24 25 Debt Service
26 Existing Debt Service $1,074,085 $1,064,460 $509,106 $464,612 $486,162 $478,567 $470,906 $463,178 $417,883 $297,520 $289,587 27 Proposed Debt Service $0 $201,647 $201,647 $201,647 $201,647 $201,647 $201,647 $201,647 $201,647 $201,647 $201,647
CITY OF SIGNAL HILL
A B C D E F H H I J K L M
Line FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 FY 2035 28 Total - Debt Service $1,074,085 $1,266,107 $710,753 $666,260 $687,809 $680,214 $672,553 $664,825 $619,530 $499,167 $491,234 29 30 Net Revenue (After Debt Service) -$257,784 $976,519 $2,425,365 $3,445,592 $4,581,682 $5,463,262 $6,054,790 $6,714,511 $7,480,986 $8,378,802 $9,443,568 31 32 Capital Projects
33 Rate Funded CIP $2,100,000 $2,768,280 $3,892,537 $4,211,753 $4,151,131 $6,241,522 $6,184,234 $5,761,346 $6,063,397 $7,199,881 $6,041,808 34 Total - Capital Projects $2,100,000 $2,768,280 $3,892,537 $4,211,753 $4,151,131 $6,241,522 $6,184,234 $5,761,346 $6,063,397 $7,199,881 $6,041,808 35 36 Net Cash Flow -$2,357,784 -$1,791,761 -$1,467,172 -$766,161 $430,551 -$778,260 -$129,445 $953,164 $1,417,588 $1,178,922 $3,401,760 37 38 Debt Service Coverage
41 Excluding General Fund Debt 107% 360% 1518% 2151% 2883% 3457% 3870% 4318% 5377% 9282% 10434% 42 Target 125% 125% 125% 125% 125% 125% 125% 125% 125% 125% 125% 62 CITY OF SIGNAL HILL
Figure 8-1: 10-Year Capital Improvement Program and Funding Figure 8-2: 10-Year Water Projected Debt Coverage
$2.1 $2.8
$3.9 $4.2 $4.2
$6.2 $6.2 $5.8 $6.1
$7.2
$6.0
$3.0
$0$1$2$3$4$5$6$7$8
FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 FY 2035 Millions
Rate Funded Debt Funded
0%
2000%4000%6000%8000%
10000%12000%
FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 FY 2035 Excluding General Fund Debt Service Required
CITY OF SIGNAL HILL
Figure 8-3: 10-Year Water Enterprise Projected Ending Balances Figure 8-4: 10-Year Water Enterprise Operating Financial Plan $7.2
$5.4
$3.9
$3.2 $3.6 $2.8 $2.7 $3.6
$5.1
$6.2
$9.6
$0$2$4$6$8
$10$12
FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 FY 2035 Millions
Ending Balance Proposed Reserve Target Current Reserve Target $0$2$4$6$8
$10$12$14$16$18$20
FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 FY 2035 Millions
Water Supply Costs O&M Expenses Debt Service Capital ProjectsReserve Funding Current Revenues Proposed Revenues