Cities Index.
Staff Report - part 2

Simi Valley City Council
July 25, 2022

Document
Staff Report - part 2
Meeting
July 25, 2022
Body
Simi Valley City Council
Original file
42.4 MB
Text extracted from the city's file for reading and search. Open the original on simivalley.granicus.com. That file is the official record.

Oxnard
Camarillo
Thousand Oaks
34 118 118
1 34
101
Data Sources: Ventura Co.,
CAL FIRE, Esri
Camarillo
Wildfire Hazard
Severity Zones
0 1 20.5 Miles
Moderate
High
Very High
Major Roads
Selected City
Incorporated Cities
County Boundary
585
3-1

3. CITY OF FILLMORE

3.1 LOCAL HAZARD MITIGATION PLANNING TEAM
Primary Point of Contact Alternate Point of Contact
D. Keith Gurrola, Fire Chief
250 Central Ave
Fillmore, CA 93015
805-524-1500
[email protected]
David Rowlands, City Manager
250 Central Ave
Fillmore, CA 93015
805-524-1500
[email protected]
This annex was developed by the local hazard mitigation planning team, whose members are listed in Table 3-1.

Table 3-1.Local Mitigation Planning Team Members
Name Title
D. Keith Gurrola Fire Chief
David Rowlands City Manager
Kevin McSweeney City Planning Director
Ines Ebell Planning Department Admin Assistant

3.2 JURISDICTION PROFILE

3.2.1 Location and Features
The City of Fillmore is in the western portion of the County of Ventura, California.

The current boundaries generally extend from the Santa Clara River going north, the Sespe Creek going east, slightly east of Pole Creek going west and the northern city boundary is the start of the foothills to the Los Padres National Forest. Fillmore is bordered on three sides by waterways, encompassing an area of 4.3 square miles.

Fillmore is located in the historic Santa Clara River Valley which is primarily all agricultural land, used to grow a wide variety of fair weather crops. As mentioned, the City is bordered by three separate waterways and open wildlands to the north.
586
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 3-2

3.2.2 History
The City of Fillmore was incorporated in 1914. The town was established in the late 1800s and was known primarily as a railroad stop for travelers. With its fertile soils, the town quickly became an agricultural community. Oil was discovered years later in the hills that surround the Community and Fillmore started supporting businesses associated with oil production and support services. With the decline of the oil industry, Fillmore was able to diversify with light industry. The agricultural image of Fillmore has never gone away and is still quite robust. Fillmore is now known as a “bedroom community” where the majority of its working class residents commute to other nearby cities to work.

3.2.3 Governing Body Format
The City of Fillmore is governed by a Council–Manager form of government.

The Fillmore City Council assumes responsibility for the adoption of this plan; the Fillmore City Manager will oversee its implementation through the oversight of the various City Departments.

3.3 CURRENT TRENDS

3.3.1 Population
According to the California Department of Finance, the population of the City of Fillmore as of January 2020 was 15,566. Since 2010, the population has grown at an average annual rate of 0.37 percent.

3.3.2 Development
General development, overall has been primarily single family dwellings with an occasional multi-family unit. An industrial business park has had only one project developed. Currently there are several plans for in-fill of multi-family structures.

Table 3-2 summarizes development trends in the period since the preparation of the previous hazard mitigation plan, as well as expected future development trends.

3.4 CAPABILITY ASSESSMENT
This section describes an assessment of existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning.

Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table in this annex identifies these as community capacity building mitigation actions. 587

3. City of Fillmore
3-3
Table 3-2.Recent and Expected Future Development Trends Criterion Response
Has your jurisdiction annexed any land since
the preparation of the previous hazard
mitigation plan?
Yes
If yes, give the estimated area annexed
and estimated number of parcels or
structures.
3 acres, 0 structures
Is your jurisdiction expected to annex any
areas during the performance period of this
plan?
No
Are any areas targeted for development or
major redevelopment in the next five years?
Yes
If yes, briefly describe, including whether
any of the areas are in known hazard risk
areas
Industrial Park, no known hazard areas
How many permits for new construction were
issued in your jurisdiction since the
preparation of the previous hazard mitigation
plan?
2016 2017 2018 2019 2020
Single Family 30 73 19 124 133
Multi-Family 0 0 0 0 0
Other (commercial, mixed use, etc.)0 1 0 0 0
Total 30 74 19 124 133
Provide the number of new-construction
permits for each hazard area or provide a
qualitative description of where development
has occurred.

All of the permits issued were in the flood hazard area. There was no new development in the wildland-urban interface zone.

Describe the level of buildout in the
jurisdiction, based on your jurisdiction’s
buildable lands inventory. If no such
inventory exists, provide a qualitative
description.
85%
The findings of the assessment are presented as follows:

An assessment of planning and regulatory capabilities is presented in Table 3-3.

Development and permitting capabilities are presented in Table 3-4.

An assessment of fiscal capabilities is presented in Table 3-5.

An assessment of administrative and technical capabilities is presented in Table 3-6.

An assessment of education and outreach capabilities is presented in Table 3-7.

Information on National Flood Insurance Program (NFIP) compliance is presented in Table 3-8.

Classifications under various community mitigation programs are presented in Table 3-9.

The community’s adaptive capacity for the impacts of climate change is presented in Table 3-10.
588
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 3-4
Table 3-3.Planning and Regulatory Capability
Local
Authority
Other Jurisdiction
Authority
State
Mandated
Integration
Opportunity?
Codes, Ordinances, & Requirements
Building Code Yes Yes Yes Yes
Comment:2019 CA Building Code, (Ord. No. 20-925, § 2, 1-28-2020) Zoning Code Yes No Yes Yes
Comment:Chapter 6.04, (Ord. No. 19-904, § 1, 3-26-2019) Subdivisions Yes No Yes No
Comment:Chapter 6.08, (Ord 467 § 1 (part), 1975)
Stormwater Management Yes No Yes Yes
Comment:Chapter 8.06, (Ord. No. 14-845, §§ 2, 3, 2-25-2014) Post-Disaster Recovery Yes No Yes Yes
Comment:1994 City of Fillmore Zoning Code, County of Ventura Disaster Management Plan
Real Estate Disclosure No Yes Yes Yes
Comment:California State Civil Code 1102 requires full disclosure on natural hazard exposure of the sale/re-sale of any and all real property. 1994 City of Fillmore Zoning Code
Growth Management Yes Yes No Yes
Comment:Chapter 6.09 (Ord. 509 § 1 (part), 1980), County Green Belt AgreementVentura County Ordinance No. 4512 (Adopted November 7, 2017)
Site Plan Review Yes No Yes Yes
Comment:Chapter 6.08, Title IV (Ord. 467 § 1 (part), 1975) Environmental Protection Yes No Yes Yes
Comment:Chapter 6.08.070 (Ord. 467 § 1 (part), 1975)
Flood Damage Prevention Yes No Yes Yes
Comment:Chapter 6.16 (Ord. 602 § 1 (part), 1988)
Emergency Management Yes No Yes Yes
Comment:Chapter 15.04.050 (Ord. 401 § 5, 1971)
Climate Change No No No No
Comment:None
Planning Documents
General Plan Yes No Yes Yes
Is the plan compliant with Assembly Bill 2140?No
Comment:2003 Plan Needs Updating
Capital Improvement Plan Yes No Yes Yes
How often is the plan updated? Every 5 Years
Comment:City of Fillmore
Disaster Debris Management Plan No Yes Yes Yes
Comment:Ventura County Disaster Recovery Plan, Adopted by BOS in April 2019 Floodplain or Watershed Plan Yes No Yes Yes
Comment:City of Fillmoreparticipates in the National Flood Insurance Program (NFIP) Stormwater Plan No No No No
Comment:None
Urban Water Management Plan Yes No Yes Yes
Comment:City of Fillmore 2015 Urban Water Management Plan Habitat Conservation Plan No No No No
Comment:None
589

3. City of Fillmore
3-5
Local
Authority
Other Jurisdiction
Authority
State
Mandated
Integration
Opportunity?
Economic Development Plan Yes No No No
Comment:Economic Development Collaborative of Ventura County Partnership Shoreline Management Plan No No No No
Comment:N/A
Community Wildfire Protection Plan No No No No
Comment:None
Forest Management Plan No No No No
Comment:N/A
Climate Action Plan No No No No
Comment:None
Emergency Operations Plan Yes Yes Yes Yes
Comment:City of FillmoreEmergency Operations Plan (EOP) Threat & Hazard Identification & Risk Assessment (THIRA) No No No No Comment:None
Post-Disaster Recovery Plan Yes No Yes Yes
Comment:Covered in the EOP
Continuity of Operations Plan Yes No No Yes
Comment:Covered in the EOP
Public Health Plan No Yes Yes Yes
Comment:County of Ventura Health Care AgencyPublic Health Emergency Response Plan (ERP) Table 3-4.Development and Permitting Capability
Criterion Response
Does your jurisdiction issue development permits? Yes
If no, who does? If yes, which department?Planning, Building, Fire Does your jurisdiction have the ability to track permits by hazard area? Yes Does your jurisdiction have a buildable lands inventory? Yes Table 3-5.Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants Yes
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes Yes
User Fees for Water, Sewer, Gas or Electric Service Yes If yes, specify: All utilities
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds Yes
Incur Debt through Private Activity Bonds No
Withhold Public Expenditures in Hazard-Prone Areas Yes
State-Sponsored Grant Programs Yes
DevelopmentImpact Fees for Homebuyers or Developers Yes Other Yes(Maintenance Assessment Districts)
590
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 3-6
Table 3-6.Administrative and Technical Capability
Staff/Personnel Resource Available?
Planners or engineers with knowledge of land development and land management practicesYes If Yes, Department /Position:Planning, Engineering
Engineersor professionalstrained in building or infrastructure construction practices Yes If Yes, Department /Position:Planning, Engineering
Planners or engineers with an understanding of natural hazards Yes If Yes, Department /Position:Planning, Engineering
Staff with training in benefit-cost analysis Yes
If Yes, Department /Position:Planning, Engineering, Finance Surveyors Yes
If Yes, Department /Position:Engineering
Personnel skilled or trained in GIS applications Yes
If Yes, Department /Position:Engineering
Scientist familiar with natural hazards in local area No Emergency manager Yes
If Yes, Department /Position:Fire
Grant writers Yes
If Yes, Department /Position:Finance, Fire
Table 3-7.Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? Yes If yes, briefly describe:Both the Police and Fire Department websites contain information.

Do you use social media for hazard mitigation education and outreach? Yes If yes, briefly describe:Yes, the major providers are all used for information sharing Do you have any citizen boards or commissions that address issues related to hazard mitigation?No Do you have any other programs in place that could be used to communicate hazard-related information?Yes If yes, briefly describe:The City participates with County OES to disseminate emergency information Do you have any established warning systems for hazard events? Yes If yes, briefly describe:Yes, we utilize County OES along with neighborhood notification via Police/Fire Table 3-8.National Flood Insurance Program Compliance
Criterion Response
Whatlocaldepartment is responsible for floodplain management? Engineering Who is your floodplain administrator? (department/position) Engineering Are any certified floodplain managers on staff in your jurisdiction? No What is the date thatyour flood damage prevention ordinancewas last amended? 1998 Does your floodplain management program meet or exceed minimum requirements?Meets When was the most recent Community Assistance Visit or Community Assistance Contact?
unknown
591

3. City of Fillmore
3-7
Criterion Response
Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed?
No
If so, state what they are.

Are any RiskMAP projects currently underway in your jurisdiction? No Do your flood hazard maps adequately address the flood risk within your jurisdiction?Yes If no, state why.

Does your floodplain management staff need any assistance or training to support its floodplain management program?
No
Does your jurisdiction participate in the Community Rating System (CRS)? No If no, is your jurisdiction interested in joining the CRS program?Unknown, would have to learn more How many flood insurance policies are in force in your jurisdiction?a 74 What is the insurance in force?$22,517,800
What is the premium in force?$34,315
How many total loss claims have been filed in your jurisdiction?a 37 What were the total payments for losses?$226,509
a. According to FEMA statistics as of March 31, 2021
Table 3-9.Community Classifications
Participating? Classification Date Classified
FIPS Code Yes 0611124092 N/A
DUNS # Yes 363056201 N/A
Community Rating System No N/A N/A
Building Code Effectiveness Grading Schedule No N/A N/A Public Protection Yes 04/4X 2018
Storm Ready No N/A N/A
Firewise No N/A N/A
Tsunami Ready No N/A N/A
Table 3-10.Adaptive Capacity for Climate Change
Criterion
Jurisdiction
Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts High Comment:Members of City Staff participate in local, regional, state and national committees Jurisdiction-level monitoring of climate change impacts High Comment:Members of City Staff participate in local, regional, state and national committees Technical resources to assess proposed strategies for feasibility and externalities High Comment:Through committee contacts, unlimited to access via internet Jurisdiction-level capacity for development of greenhouse gas emissions inventory High Comment:Fillmore is a small geographical city with specifically known sources of emission Capital planning and land use decisions informed by potential climate impacts High Comment:Fillmore implements an extensive review process, the total number of projects are manageable Participation in regional groups addressing climate risks High Comment:City Staff participates at many levels
592
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 3-8
Criterion
Jurisdiction
Ratinga
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processesHigh Comment:Planning Commission and City Council advocate
Identified strategies for greenhouse gas mitigation efforts Low Comment:Currently addressing vehicle exhaust emissions
Identified strategies for adaptation to impacts Medium
Comment:Costs effectiveness
Champions for climate action in local government departments Medium Comment:Looking at opportunities for all new vehicles and equipment Political support for implementing climate change adaptation strategies Medium Comment:All levels of decision making are to embrace
Financial resources devoted to climate change adaptation Medium Comment:Looking for grants, new purchases
Local authority over sectors likely to be negative impacted High Comment:The City has full authority over all Departments Public Capacity
Local residents’ knowledge of and understanding of climate risk Low Comment:

Local residents’ support of adaptation efforts Medium
Comment: General support, no negative reports
Local residents’ capacity to adapt to climate impacts Medium Comment: General support, no negative reports
Local economy current capacity to adapt to climate impacts Medium Comment: Limited impact in short term
Local ecosystems capacity to adapt to climate impacts Medium Comment: Limited impact in short term, some impact from agriculture a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.

3.5 INTEGRATION REVIEW
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as general planning and capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future.

Resources listed at the end of this annex were used to provide information on integration. The progress reporting process described in Volume 1 of the hazard mitigation plan will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration.

3.5.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs:

Fillmore Municipal Code
593

3. City of Fillmore
3-9
Developer Impact Fees
1994 City of Fillmore Zoning Code
2015 County of Ventura Disaster Management Plan
General Plan Land Use Element 2005

3.5.2 Opportunities for Future Integration
The capability assessment in this annex indicates opportunities to integrate this mitigation plan with other jurisdictional planning/regulatory capabilities. Capabilities were identified as integration opportunities if they can support or enhance the actions identified in this plan or be supported or enhanced by components of this plan. The capability assessment identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future:

Central Ventura County Regional Fire Safe Council Wildland Fire Mitigation Plan—In future updates, the Wildfire Mitigation Plan may use or reference applicable wildfire hazard maps and risk data presented in this hazard mitigation plan.

City of Fillmore Capital Improvement Plan 2021—Capital improvement project proposals may take into consideration hazard mitigation potential to evaluate project prioritization.

Taking action to integrate each of these programs with the hazard mitigation plan was considered as a mitigation action to include in the action plan in this annex.

3.6 RISK ASSESSMENT

3.6.1 Jurisdiction-Specific Natural Hazard Event History Table 3-11 lists past occurrences of natural hazards for which specific damage was recorded in this jurisdiction Other hazard events that broadly affected the entire planning area, including this jurisdiction, are listed in the risk assessments in Volume 1 of this hazard mitigation plan.

3.6.2 Hazard Risk Ranking
Table 3-12 presents a local ranking of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property, and the economy. Mitigation actions primarily target hazards with high and medium rankings.

3.6.3 Jurisdiction-Specific Vulnerabilities
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. This section provides information on a few key vulnerabilities for this jurisdiction. Available jurisdiction-specific risk maps of the hazards are provided at the end of this annex. 594
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 3-10
Table 3-11.Past Natural Hazard Events
Type of Event
FEMA
Disaster # Date Damage Assessment
COVID-19PandemicDR-4482 Jan 20, 2020-current N/A
Thomas Fire FM-5302 Dec 4, 2017-Jan 2018 No structural damage, but air quality issues and provided mutual aid.

Opened evacuation centers at the high school and the recreation facility.

Guiberson Fire FM-2839 Sept 2009 No structural damage, but air quality issues and provided mutual aid.

Day Fire FM-2677 Sept 2006 No structural damage, but air quality issues and provided mutual aid.

Wildfires DR-1498 Oct 2003 No structural damage, but air quality issues and provided mutual aid.

Severe Fires EM-3120 Oct 1996 No structural damage, but air quality issues and provided mutual aid.

Winter Storm DR-1046 Feb 1995 Economic impacts affecting agricultural packinghouses Northridge
Earthquake
DR-1008 Jan 1994 $50 million in damage and building inspectors red-tagged about 200 buildings and homes as too dangerous to inhabit.

Severe Storm DR-935 Feb, 1992 N/A
Severe Storm DR-615 Jan 1980 N/A
Flooding DR-547 Feb 1978 Evacuations
Sylmar EarthquakeN/A Feb 9, 1971 N/A
Brush Fires DR-295 Sept 1970 Packing house within the city limits burned, but may have been an arson of opportunity.

Flooding DR-253 Jan 1969 Evacuations
Flooding N/A Numerous pre 1964 N/A
St Francis Dam
Disaster
March 12, 1928 $7 Million (1928)—Inundation of nearly the entire city, flooding, debris flows, destruction of infrastructure, high loss of life Table 3-12.Hazard Risk Ranking
Rank Hazard Risk RankingScore Risk Category
1 Dam Failure 36 High
2 Earthquake 32 Medium
3 Severe Storm 24 Medium
4 Severe Weather 24 Medium
5 Wildfire 18 Medium
6 Flooding 18 Medium
7 Landslide 18 Medium
8 Drought 9 Low
Repetitive Loss Properties
Repetitive loss records are as follows:

Number of FEMA-identified Repetitive-Loss Properties: 0 Number of FEMA-identified Severe-Repetitive-Loss Properties: 0 Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 0
595

3. City of Fillmore
3-11
Other Noted Vulnerabilities
The following jurisdiction-specific issues have been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources: N/A Two large-scale evacuations due to hazardous material fires. Both events triggered evacuations of 25 percent of the city’s population.

City recreation facility is used as an evacuation center but lacks showers.

Mitigation actions addressing these issues were prioritized for consideration in the action plan in this annex.

3.7 STATUS OF PREVIOUS PLAN ACTIONS
Table 3-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared.

Table 3-13.Status of Previous Plan Actions
Removed;
Carried Over to
Plan Update
Action Item Completed
No Longer
Feasible
Check
if Yes
Action #
in Update
F 1—Construction of Pole Creek Debris Basin. The basin is awaiting Ventura County Watershed District approval for improvements to Final and to accept construction. The Basin will accept mud and debris flow from the Pole Creek watershed in a 100 year rain event and protect all future homes in the Heritage Valley Parks Specific Plan consisting of 750 residential units. The debris basin project includes levees, basin maintenance roads and water flow to the Santa Clara River. The Basin is proposed to be owned and operated by Ventura County Water Shed Protection District.

Comment:The Basin wascompleted in 2009, it is maintained by the Developer until Ventura County Watershed accepts F 2—Completion of the Heritage Valley Parks Levees. Over 1.5 miles of soil cement levee was constructed for protection of a 100 year storm and water flow from the Santa Clara River. Parks and streets about the levee in order to avoid any emergency conflict with proposed residential units. The Levee system protects the 750 proposed residential units in the Heritage Valley Parks Specific Plan and a proposed 110 condominium project proposed by KB Homes.

Comment:The levee wascompleted in 2006 but not yet certified, awaiting final construction of the last few remaining residential units
F 3—Completion of the Lower Sespe Creek Levee. A ½ mile in length soil cement levee was constructed south of Hwy 23 to protect the newly constructed Water Recycling Plant and protect the future Business Park Master Plan.

Comment:This levee was completed in 2008from Hy 126 south to the City limits F 4—Completion of the Central Avenue Storm Drain. A large storm drain was installed in Central Ave to protect the Central Business District from floods that historically threatened downtown.

Comment:This storm drain project was completed in 2008 and drains into the Santa Clara River, improvements will be made on last 100 yards
F 5—Continue to monitor the need to demolish abandoned and dilapidated buildings.

Comment:This is an ongoingproject, numerous buildings have been demolished, looking for opportunities as they present themselves for additional structures 596
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 3-12

3.8 HAZARD MITIGATION ACTION PLAN
Table 3-14 lists the identified actions, which make up the hazard mitigation action plan for this jurisdiction. Table 3-15 identifies the priority for each action. Table 3-16 summarizes the mitigation actions by hazard of concern and mitigation type.

Table 3-14.Hazard Mitigation Action Plan Matrix
BenefitsNew or
Existing AssetsObjectives Met
Lead
Agency Support Agency
Estimat
ed Cost Sources of FundingTimelinea
Action FIL-1—Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.

Hazards Mitigated:Dam Failure, Earthquake, Severe Storm, Severe Weather, Wildfire, Flooding, Landslide Existing 2, 6, 9, 10, 11 Public
Works.

Community
Development
High Grant Funding-FEMA HMA
(BRIC, FMA, HMGP)
Short-term
Action FIL-2—Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community.

Hazards Mitigated:Dam Failure, Earthquake, Severe Storm, Severe Weather, Wildfire, Flooding, Landslide, Drought New & Existing1, 2, 3, 4, 5, 7, 8, 9,
10, 11, 12, 13, 14, 15,
17, 19
Community
Development
Public Works Low Staff Time, General FundsOngoing
Action FIL-3—Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.

Hazards Mitigated:Dam Failure, Earthquake, Severe Storm, Severe Weather, Wildfire, Flooding, Landslide, Drought New & Existing 1, 2, 4, 6, 7, 8,9, 11,
12, 13, 14, 15
Public Works Community
Development
Low Staff Time, General Funds Short-term
Action FIL-4—Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements:

Enforce the flood damage prevention ordinance.

Participate in floodplain identification and mapping updates.

Provide public assistance/information on floodplain requirements and impacts.

Hazards Mitigated:Flooding
New & Existing 1, 2, 6, 7, 17 Public Works Community
Development
Low Staff Time, General FundsOngoing
Action FIL-5—Identify and pursue strategies to increase adaptive capacity to climate change.

Hazards Mitigated:Severe Storm, Severe Weather, Wildfire, Flooding, Drought New & Existing1, 2, 3, 4, 5, 6, 7, 8, 9,
10,11, 12, 13, 14, 15,
16, 19
Community
Development
Public Works Low Staff Time, General Funds,
Grant Funding-FEMA HMA
(BRIC, FMA, HMGP)
Short-term
Action FIL-6—Purchase generators for critical facilities and infrastructure that lack adequate backup power.

Hazards Mitigated:Dam Failure, Earthquake, Severe Storm, Severe Weather, Wildfire, Flooding, Landslide Existing 2, 19 Public Works Community
Development
High Grant Funding-FEMA HMA
(BRIC and HMGP)
Short-term
Action FIL-7—Study feasibility of developing a resilience hub in the city to provide the resources residents need to enhance their own individual capacity while also supporting and strengthening the community before and during a disaster event.

Hazards Mitigated:Dam Failure, Earthquake, Severe Storm, Severe Weather, Wildfire, Flooding, Landslide New 2, 3, 7, 8, 12, 17Community
Development
High Staff Time, General Funds,
Grant Funding-FEMA HMA
(BRIC, FMA, HMGP)
Short-term
597

3. City of Fillmore
3-13
BenefitsNew or
Existing AssetsObjectives Met
Lead
Agency Support Agency
Estimat
ed Cost Sources of FundingTimelinea
Action FIL-8—Study feasibility of developing an alternative Emergency Operations Center (EOC) location to use during a disaster.

Hazards Mitigated:Earthquake, Severe Storm, Severe Weather, Wildfire, Flooding, Terrorism New 2, 3, 7, 8, 12, 17Community
Development
High Staff Time, Grant Funding-

FEMA HMA (BRIC, FMA,
HMGP)
Long-term
Action FIL-9—Hardening of the City Water Delivery System and computerized upgrade.

Hazards Mitigated:Dam Failure, Severe Storm, Severe Weather, Drought, Wildfire, Flooding, Terrorism New 2, 6, 9, 10, 11 Public Works High Staff Time, Grant Funding-

FEMA HMA (BRIC, FMA,
HMGP)
Short-term
Action FIL-10—Continue and enhance the public outreach program for wildfire education and prevention among school children and the general community.

Hazards Mitigated:Wildfire
New& Existing2,5,7,8,10,11,12,
13, 14, 15, 17
Fillmore Fire
Department
Fire Safe Council Low Staff Time, Fillmore Volunteer
Firefighter Foundation, Grant
Funding—Edison International
Utility Grant
Ongoing
Action FIL-11—Maintain wildfire hazard fuel reduction program for areas that have been identified with overgrown or dead brush, trees and weeds to reduce the potential for tree-to-tree ignition. Ensure that a “maintenance now” component to provide continued fire resistance is part of the program. (Coordinates with VCFPD Action VFP-6) Hazards Mitigated:Wildfire
New& Existing 2,4,5,6,8,10,11,
13, 14, 15, 18, 19
Fillmore Fire
Department
CAL FIRE, Ventura
County Fire Protection
District, Fire Safe
Council
Low FEMA HMA (BRIC, FMAP and
HMGP), Staff Time & General
Funds
Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date
Acronyms used here are defined at the beginning of this volume.

Table 3-15.Mitigation Action Priority
Action #
# of
Objectives
Met BenefitsCosts
Do Benefits
Equal or
Exceed Cost?
Is Project
Grant-
Eligible?
Can Project Be Funded
Under Existing
Programs/ Budgets?
Implementation
Prioritya
Grant
Pursuit
Prioritya
1 5 High High Yes Yes No Medium High
2 16 Medium Low Yes No Yes High Low
3 12 Low Low Yes No Yes High Low
4 5 Medium Low Yes No Yes High Low
5 17 Medium Low Yes No Yes High Medium
6 2 High Medium Yes Yes No Medium High
7 6 Medium High No Yes No Low Medium
8 6 Medium High No Yes No Low Medium
9 5 Medium High No Yes No Low Medium
10 11 Medium Low Yes Yes Yes High High
11 12 High Low Yes Yes Yes High High
a. See the introduction to this volume for explanation of priorities. 598
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 3-14
Table 3-16.Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention
Property
Protection
Public
Education &
Awareness
Natural
Resource
Protection
Emergency
Services
Structural
Projects
Climate
Resilience
Community
Capacity
Buildingb
High-Risk Hazards
Dam Failure FIL-2 FIL-1, 9 FIL-3 FIL-6 FIL-2, 3, 7
Medium-Risk Hazards
Earthquake FIL-2 FIL-1 FIL-3 FIL-6 FIL-2, 3, 7, 8
Severe Storm FIL-2 FIL-1, 9 FIL-3 FIL-6 FIL-5 FIL-2, 3, 7, 8 Severe Weather FIL-2 FIL-1, 9 FIL-3 FIL-6 FIL-5 FIL-2, 3, 7, 8 Wildfire FIL-2 FIL-1, 9 FIL-3, 10 FIL-10,11 FIL-6 FIL-5 FIL-2, 3, 7, 8 Flooding FIL-2, 4 FIL-1, 9 FIL-3, 4 FIL-6 FIL-5 FIL-2, 3, 4, 7, 8
Landslide FIL-2 FIL-1 FIL-3 FIL-6 FIL-2, 3, 7
Low-Risk Hazards
Drought FIL-2 FIL-9 FIL-3 FIL-5 FIL-2, 3
a. See the introduction to this volume for explanation of mitigation types. b. Note that the jurisdiction did not identify a need for expansion of financial capabilities, based on existing capabilities. The intent of this hazard mitigation plan is to expand the financial capability of the jurisdiction.

3.9 PUBLIC OUTREACH
Table 3-17 lists public outreach activities for this jurisdiction.

Table 3-17.Local Public Outreach
Local Outreach Activity Date
Number of People
Involved
Disaster preparedness Every September 500
Earth Day Every April 500
Hazardous vegetation chipping days May & September 100
Fire department children education 10 times a year 10,000

3.10 INFORMATION SOURCES USED FOR THIS ANNEX
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex.

City of Fillmore Municipal Code—The municipal code was reviewed for the full capability assessment and for identifying opportunities for action plan integration.

City of Fillmore Flood Damage Prevention Ordinance—The flood damage prevention ordinance was reviewed for compliance with the National Flood Insurance Program.

City of Fillmore General Plan—The GP was reviewed for the capability assessment.

City of Fillmore Capital Improvement Program—The CIP was reviewed for identifying opportunities for action plan integration.
599

3. City of Fillmore
3-15
The following outside resources and references were reviewed:

Hazard Mitigation Plan Annex Development Toolkit—The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan.
600
Fillmore
23 126
126
Food, Water, Shelter
Safety and Security
Major Roads
Selected City
Incorporated Cities
County Boundary
Data Sources: Ventura Co., VCFD,
Casitas MWD, Calleguas MWD,
City of Camarillo, CA Energy
Commission, Cal Trans, EPA,
HIFLD, Esri
Fillmore
Critical Facilities (1 of 2)
0 0.35 0.70.175 Miles
601
Fillmore
23 126
126
Communications
Energy
Hazardous Material
Transportation
Major Roads
Selected City
Incorporated Cities
County Boundary
Data Sources: Ventura Co., VCFD,
Casitas MWD, Calleguas MWD,
City of Camarillo, CA Energy
Commission, Cal Trans, EPA,
HIFLD, Esri
Fillmore
Critical Facilities (1 of 2)
0 0.35 0.70.175 Miles
602
Fillmore
23 126
126
Data Sources: Ventura Co.,
CA DWR, Esri
Fillmore
Dam Failure
Inundation Areas
0 0.35 0.70.175 Miles
Combined Inundation
Areas
Major Roads
Selected City
Incorporated Cities
County Boundary
603
Fillmore
23 126
126
Data Sources: Ventura Co.,
CGS, Esri
Fillmore
NEHRP Soil Class
0 0.35 0.70.175 Miles
C (Dense soil/soft rock)
D (Stiff soil)
Major Roads
Selected City
Incorporated Cities
County Boundary
604
Fillmore
23 126
126
Data Sources: Ventura Co.,
Esri
Fillmore
Liquefaction Susceptibility
0 0.35 0.70.175 Miles
Liquefaction zone
Major Roads
Selected City
Incorporated Cities
County Boundary
605
Fillmore
23 126
126
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Fillmore
100-Year Probabilistic
Earthquake Scenario
0 0.35 0.70.175 Miles
Mercalli Intensity Scale
VII (Very Strong/Moderate)
Major Roads
Selected City
Incorporated Cities
County Boundary
606
Fillmore
23 126
126
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Fillmore
Oak Ridge M7.16
Earthquake Scenario
0 0.35 0.70.175 Miles
Mercalli Intensity Scale
VIII (Severe/Moderate-Heavy)
Major Roads
Selected City
Incorporated Cities
County Boundary
607
Fillmore
23 126
126
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Fillmore
Pitas Point M7.12
Earthquake Scenario
0 0.35 0.70.175 Miles
Mercalli Intensity Scale
VII (Very Strong/Moderate)
VIII (Severe/Moderate-Heavy)
Major Roads
Selected City
Incorporated Cities
County Boundary
608
Fillmore
23 126
126
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Fillmore
San Cayetano M7.16
Earthquake Scenario
0 0.35 0.70.175 Miles
Mercalli Intensity Scale
VIII (Severe/Moderate-Heavy)
Major Roads
Selected City
Incorporated Cities
County Boundary
609
Fillmore
23 126
126
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Fillmore
S. San Andreas M8.03
Earthquake Scenario
0 0.35 0.70.175 Miles
Mercalli Intensity Scale
VI (Strong/Light)
Major Roads
Selected City
Incorporated Cities
County Boundary
610
Fillmore
23 126
126
Data Sources: Ventura Co.,
FEMA, Esri
Fillmore
FEMA Flood Hazard Areas
0 0.35 0.70.175 Miles
1% Annual Chance
Flood (100-Year)

0.2% Annual Chance
Flood (500-Year)
Major Roads
Selected City
Incorporated Cities
County Boundary
611
Fillmore
23 126
126
Data Sources: Ventura Co.,
CGS, Esri
Fillmore
Susceptibility to
Deep-Seated Landslides
0 0.35 0.70.175 Miles
Low
Moderate
High
Very High
Major Roads
Selected City
Incorporated Cities
County Boundary
612
Fillmore
23 126
126
Data Sources: Ventura Co.,
CAL FIRE, Esri
Fillmore
Wildfire Hazard
Severity Zones
0 0.35 0.70.175 Miles
Moderate
High
Very High
Major Roads
Selected City
Incorporated Cities
County Boundary
613
4-1

4. CITY OF MOORPARK

4.1 LOCAL HAZARD MITIGATION PLANNING TEAM
Primary Point of Contact Alternate Point of Contact
Mack Douglass, Program Manager
799 Moorpark Ave.

Moorpark, CA 93021
Telephone: 805-517-6241
e-mail Address: [email protected]
Kambiz Borhani, Finance Director
799 Moorpark Ave.

Moorpark, CA 93021
Telephone: 805-517-6249
e-mail Address:
[email protected]
This annex was developed by the local hazard mitigation planning team, whose members are listed in Table 4-1.

Table 4-1.Local Mitigation Planning Team Members
Name Title
Mack Douglass Program Manager, Emergency Management
Robert Valery Parks and Facilities Supervisor
Leonard Mendez Public Works Supervisor
PJ Gagajena Assistant City Manager
Douglas Spondello Interim Community Development Director

4.2 JURISDICTION PROFILE

4.2.1 Location and Features
Founded by Robert Poindexter in 1900 and incorporated in July 1983, the City of Moorpark is one of ten incorporated cities of Ventura County and is located in the eastern portion of the County. The City encompasses approximately 12.4 square miles and a population of 36,278 as of 2020. It is generally bounded by the City of Simi Valley to the east, the Tierra Rejada Valley and City of Thousand Oaks to the south, and unincorporated lands to the west and north. Lands west of the city are largely agricultural and protected from development by the Save Open Space and Agricultural Resources voter approved initiatives requiring the public’s vote before any agricultural or open space lands are rezoned for development. Lands to the north of City’s boundary are largely mountainous. It is connected to the region by two freeways, SR-118 to the east and SR-23 to the south, and Los Angeles Avenue (SR-118) to the west. Moorpark is home to Moorpark Community College, and is served by the Moorpark Unified School District for grades K-12.
614
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 4-2
Significant geographical features include the Arroyo Simi, which runs from east to west through central Moorpark. The City is also bisected by State Routes 118 and 23.

4.2.2 History
What is known about the settled history of Moorpark begins with the Chumash tribe of Native Americans, who lived and traded in the area prior to the arrival of Spanish explorers in the 16th century and missionaries in the centuries that followed. The Chumash village of Quimisac was located northeast of present-day Moorpark in the vicinity of what is now known as Happy Camp Canyon Park.

Permanent settlement of the area can be traced back to successive eras of land ownership, starting with the gifting of the Rancho San Jose de Nuestra Señora de Altagarcia y Simi (Rancho Simi) to Francisco Javier Pico and his brothers by Governor Diego de Borica in 1795. When Moorpark was founded, the small farming communities of Fremontville and Epworth were already established in the area. In 1900, Robert W. and Madeleine Poindexter established a town site in anticipation of the arrival of the Southern Pacific Railroad and named it Moorpark, after the apricot variety that grew in the region.

A depot was constructed that year, and several buildings originally constructed in Fremontville and Epworth were relocated to the burgeoning town. Growth began in earnest after 1904, when the railroad tunnels through the Santa Susana Mountains were completed to the east, connecting the area to the Los Angeles basin. Early development in Moorpark was concentrated in the downtown area along High Street, with the area south of the railroad tracks remaining largely farmland for many years.

The railroad and its connection to faraway markets facilitated the growth of the agriculture industry, the economic lifeblood of Moorpark. In the City’s early years, dry land crops such as apricots, black-eyed beans, hay, and lima beans were the primary farming staples. Though agriculture remained an economic engine after World War II, the growth of turkey, chicken, and egg ranches fed the development of the poultry industry and a diversifying economy.

Moorpark became one of the first cities in the world to run off commercial nuclear power in 1957.

Moorpark Community College opened on September 11, 1967.

Moorpark was incorporated as a city on July 1, 1983, marking the most dramatic period of growth of new homes and businesses in the City’s history. This period saw a substantial shift in the Moorpark’s center of activity, with large-scale development occurring in many areas that had heretofore been used for agriculture. High Street and the surrounding area remained the social and retail center of Moorpark through the 1980s until commercial activity began to shift to the south and suburban-style, multitenant retail centers grew along Los Angeles Avenue. Significant growth in home construction began in the late 1970s and accelerated through the 1980s as subdivisions such as Mountain Meadows and Peach Hill expanded the city’s built footprint from the flatlands into the surrounding hillsides. Despite this growth, vestiges of the City’s history still remain. Moorpark contains three locally significant resources, nine Points of Historic Interest, and one built environment resource listed in the California Register of Historical Resources (CRHR). Locally significant resources include the Taylor House, the First Southern Baptist Church and High Street’s Pepper Trees. The highest level of significance conferred on a historical resource in the City is applied to Tanner’s Corner, which is listed in the CRHR as an individual property.
615

4. City of Moorpark
4-3

4.2.3 Governing Body Format
The City of Moorpark operates under a council-manager form of government. The City Council assumes responsibility for the adoption of this plan; the City of Moorpark will oversee its implementation.

4.3 CURRENT TRENDS

4.3.1 Population
According to the California Department of Finance, the population of the City of Moorpark as of January 2020 was 36,278. Since 2010, the population has grown at an average annual rate of 0.54 percent.

Moorpark’s median age of 37.6 is close to the County median of 37.9, but younger that the neighboring cities. The percentage of the population under 18 years old is 23.1 percent, close to the state and County and higher than its three neighbors. Its percentage of population 65 years and above is lower than the state and County and substantially lower than the neighboring cities.

4.3.2 Development
Table 4-2 summarizes development trends in the period since the preparation of the previous hazard mitigation plan, as well as expected future development trends. Figure 4-1 describes the existing land uses and development characteristics within the City of Moorpark.

Table 4-2.Recent and Expected Future Development Trends Criterion Response
Has your jurisdiction annexed any land since
the preparation of the previous hazard
mitigation plan?
No
Is your jurisdiction expected to annex any
areas during the performance period of this
plan?
No
Are any areas targeted for development or
major redevelopment in the next five years?
Yes
If yes, briefly describe, including whether
any of the areas are in known hazard risk
areas
There are several major development projects that have been entitled in various locations within Moorpark, including approximately 1,200 housing units, commercial and industrial projects. There are also several significant applications that are pending entitlement. Each site is unique but generally potential risks that have been assessed and mitigated with each project include areas of known liquefaction, potential flooding, and designated Very High Fire Hazard Severity Zones. The Moorpark Community Development Department maintains a list of pending development projects on the City’s website.

How many permits for new construction were
issued in your jurisdiction since the
preparation of the previous hazard mitigation
plan?
2016 2017 2018 2019 2020
Single Family 87 66 27 4 21
Multi-Family 0 0 0 0 185
Other (commercial, mixed use, etc.)16 10 7 6 10
Total 103 76 34 10 216
616
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 4-4
Criterion Response
Provide the number of new-construction
permits for each hazard area or provide a
qualitative description of where development
has occurred.

The majority of the City is within a designated Very High Fire Hazard Severity Zone.

Many properties near the Arroyo Simi are also within a FEMA Special Flood Hazard Area. Large areas of the City are also vulnerable to liquefaction, primarily along the Arroyo Simi and tributary streams.

Describe the level of buildout in the
jurisdiction, based on your jurisdiction’s
buildable lands inventory. If no such
inventory exists, provide a qualitative
description.

Moorpark is approaching build out, with infill and redevelopment projects comprising the bulk of our construction activity. Limited numbers of development projects located around the periphery of the City, such as Hitch Ranch are moving through the entitlement process, but may not break ground in the near future.

Figure 4-1. Moorpark Land Use and Development Characteristics 617

4. City of Moorpark
4-5

4.4 CAPABILITY ASSESSMENT
This section describes an assessment of existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning.

Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table in this annex identifies these as community capacity building mitigation actions. The findings of the assessment are presented as follows:

An assessment of planning and regulatory capabilities is presented in Table 4-3.

Development and permitting capabilities are presented in Table 4-4.

An assessment of fiscal capabilities is presented in Table 4-5.

An assessment of administrative and technical capabilities is presented in Table 4-6.

An assessment of education and outreach capabilities is presented in Table 4-7.

Information on National Flood Insurance Program (NFIP) compliance is presented in Table 4-8.

Classifications under various community mitigation programs are presented in Table 4-9.

The community’s adaptive capacity for the impacts of climate change is presented in Table 4-10.

Table 4-3.Planning and Regulatory Capability
Local
Authority
Other Jurisdiction
Authority
State
Mandated
Integration
Opportunity?
Codes, Ordinances, & Requirements
Building Code Yes Yes Yes Yes
Comment:California Building Code, 2019 Edition, adopted in Moorpark Municipal Code, Chapter 15.08 Building Code (Ord. 474 § 3, 2019)
Zoning Code Yes No Yes Yes
Comment:Moorpark Municipal Code Title 17, (Ord. 189 § 3 (8101-0), 1994) Subdivisions Yes No Yes Yes
Comment:Moorpark Municipal Code Title 16, (Ord. 334 § 1 Exh. A, 2006) Stormwater Management Yes No No Yes
Comment:Moorpark Municipal Code Title 8, (Ord. 240 § 2, 1997) Post-Disaster Recovery Yes No No Yes
Comment:City of Moorpark Emergency Operations Plan. Last updated 2015, update currently underway Real Estate Disclosure No Yes Yes Yes
Comment:California State Civil Code 1102 requires full disclosure on natural hazard exposure of the sale/re-sale of any and all real property.

Growth Management Yes No No No
Comment:City of Moorpark General Plan. Last updated in 1992, comprehensive update is currently underway Site Plan Review Yes No No Yes
Comment:Moorpark Municipal Code Chapter 17.44 Application Review Procedures. (Ord. 297 Exh. A, 2003) 618
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 4-6
Local
Authority
Other Jurisdiction
Authority
State
Mandated
Integration
Opportunity?
Environmental Protection Yes Yes Yes No
Comment:CEQA (California Code of Regulations Title 14, Division 6, Chapter 3) is implemented by the City for all land use impacts. On July 21, 2004, the City Council adopted Resolution Number 2004-2224 and on September 15, 2004, the Moorpark Redevelopment Agency adopted Resolution Number 2004-142, establishing Procedures of the City of Moorpark and Moorpark Redevelopment Agency to Implement the California Environmental Quality Act (CEQA).The ongoing Comprehensive General Plan Update will include a program EIR.

Flood Damage Prevention Yes Yes Yes Yes
Comment:Moorpark Municipal Code Section 15.24 Floodplain Management(Ord. 279 § 1, 2002) Emergency Management Yes Yes Yes Yes
Comment:Moorpark Municipal Code Chapter 2.48 (Ord. 89-106 § 1, 1989) Climate Change Yes Yes Yes Yes
Comment:Comprehensive General Plan update will contain a climate change element.

Planning Documents
General Plan Yes Yes Yes Yes
Is the plan compliant with Assembly Bill 2140?Yes
Comment:Comprehensive General Plan update is currently underway Capital Improvement Plan Yes Yes Yes Yes
How often is the plan updated?CIP is approved by City Council every seven years and updated by staff annually Comment:City of Moorpark Capital Improvement Program FY 2016/17-2022/23 Disaster Debris Management Plan No Yes No No
Comment:Ventura County Disaster Recovery Plan, Adopted by BOS in April 2019 Floodplain or Watershed Plan Yes No Yes Yes
Comment:Moorpark Municipal Code Section 15.24. This code is current through Ordinance 20-488 and the March 2021 code supplement. The City participates in the National Flood Insurance Program (NFIP) Stormwater Plan Yes No Yes Yes
Comment:Moorpark Municipal Code Section 8.52 This code is current through Ordinance 20-488 and the March 2021 code supplement.

Urban Water Management Plan N/A N/A N/A N/A
Comment:City of Moorpark is not a water purveyor
Habitat Conservation Plan No No No No
Comment:

Economic Development Plan Yes No Yes No
Comment:Comprehensive General Plan updatewill contain an economic development chapter.

Shoreline Management Plan N/A N/A N/A N/A
Comment:N/A
Community Wildfire Protection Plan No No No No
Comment:The city does not have this plan
Forest Management Plan N/A N/A N/A N/A
Comment:N/A
Climate Action Plan Yes No Yes Yes
Comment:Climate Action Plan Element will be part of the ongoing General Plan Update Emergency OperationsPlan Yes No Yes Yes
Comment:2014 Moorpark Emergency Operations Plan. Comprehensive EOP Update currently underway.

Threat & Hazard Identification & Risk Assessment (THIRA)No Yes No No Comment:The city does not have this assessment
Post-Disaster Recovery Plan Yes No No Yes
Comment:This is part of the City of Moorpark Emergency Operations Plan (EOP) 2014 619

4. City of Moorpark
4-7
Local
Authority
Other Jurisdiction
Authority
State
Mandated
Integration
Opportunity?
Continuity of Operations Plan Yes No Yes Yes
Comment:2014 Moorpark Emergency Operations Plan. Comprehensive EOP Update currently underway.

Public Health Plan No Yes Yes No
Comment:The General Plan Update will include an Element regarding Public Health however the City does not currently have a Public Health Plan. County of Ventura Health Care Agency Public Health Emergency Response Plan (ERP) Table 4-4.Development and Permitting Capability
Criterion Response
Does your jurisdiction issue development permits? Yes
If no, who does? If yes, which department?Community Development Does your jurisdiction have the ability to track permits by hazard area? No Does your jurisdiction have a buildable lands inventory? Yes Table 4-5.Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants Yes
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes Yes
User Fees for Water, Sewer, Gas or Electric Service No
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds Yes
Incur Debt through Private Activity Bonds Yes
Withhold Public Expenditures in Hazard-Prone Areas Yes
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers Yes Table 4-6.Administrative and Technical Capability
Staff/Personnel Resource Available?
Planners or engineers with knowledge of land development and land management practicesYes If Yes, Department /Position:Community Development and Public Works Engineers or professionals trained in building or infrastructure construction practices Yes If Yes, Department /Position:Public Works
Planners or engineers with an understanding of natural hazards Yes If Yes, Department /Position:Community Development and Public Works Staff with training in benefit-cost analysis Yes
If Yes, Department /Position:Finance
Surveyors No
Personnel skilled or trained in GIS applications No
Scientist familiar with natural hazards in local area No Emergency manager Yes
If Yes, Department /Position:Program Manager, Finance Department Grant writers No
620
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 4-8
Table 4-7.Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? No Do you use social media for hazard mitigation education and outreach? No Do you have any citizen boards or commissions that address issues related to hazard mitigation?No Do you have any other programs in place that could be used to communicate hazard-related information? Yes If yes, briefly describe: Community Emergency Response Team Do you have any established warning systems for hazard events? No If yes, briefly describe:

Table 4-8.National Flood Insurance Program Compliance
Criterion Response
What local department is responsible for floodplain management? Public Works Who is your floodplain administrator? (department/position) Public Works Director Are any certified floodplain managers on staff in your jurisdiction? No What is the date thatyour flood damage prevention ordinancewas last amended? 2002 Does your floodplain management program meet or exceed minimum requirements?Meets When was the most recent Community Assistance Visit or Community Assistance Contact?Unknown Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No Are any RiskMAP projects currently underway in your jurisdiction? No Do your flood hazard maps adequately address the flood risk within your jurisdiction?Yes Does your floodplain management staff need any assistance or training to support its floodplain management program?
No
Does your jurisdiction participate in the Community Rating System (CRS)? No If no, is your jurisdiction interested in joining the CRS program?No How many flood insurance policies are in force in your jurisdiction?a 117 What is the insurance in force? $39,692,000
What is the premium in force?$114,239
How many total loss claims have been filed in your jurisdiction?a 2 What were the total payments for losses?$33,576
a. According to FEMA statistics as of March 31, 2021
Table 4-9.Community Classifications
Participating? Classification Date Classified
FIPS Code Yes 0611149138 N/A
DUNS # Yes 628053464 N/A
Community Rating System No N/A N/A
Building Code Effectiveness Grading Schedule No N/A N/A Public Protection No N/A N/A
Storm Ready No N/A N/A
Firewise No N/A N/A
Tsunami Ready No N/A N/A
621

4. City of Moorpark
4-9
Table 4-10.Adaptive Capacity for Climate Change
Criterion
Jurisdiction
Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Medium Comment: Staff and elected officials understand potential climate change impacts.t Jurisdiction-level monitoring of climate change impacts Low Comment:

Technical resources to assess proposed strategies for feasibility and externalities Low Comment:

Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment:

Capital planning and land use decisions informed by potential climate impacts High Comment: General Plan Update will include a climate action plan element.

Participation in regional groups addressing climate risks Low Comment:

Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processesHigh Comment: City Council and the City Manager have the authority to consider and direct action to address potential climate change impacts
Identified strategies for greenhouse gas mitigation efforts High Comment: City Council recently enacted an SB 1383 compliant ordinance, which will reduce GHG emissions from organic waste Identified strategies for adaptation to impacts Low
Comment:

Champions for climate action in local government departments Unsure Comment:

Political support for implementing climate change adaptation strategies Unsure Comment:

Financial resources devoted to climate change adaptation Low Comment:

Local authority over sectors likely to be negative impacted Low Comment:

Public Capacity
Local residents’ knowledge of and understanding of climate risk Medium Comment:Evidence of climate change is obvious inMoorpark and directly affects the lives of residents through sustained droughts, frequent wildfires, high wind events and Public Safety Power Shutoffs.

Local residents’ supportof adaptation efforts Unsure
Comment:

Local residents’ capacity to adapt to climate impacts Unsure Comment:

Local economy current capacity to adapt to climate impacts Low Comment:

Local ecosystems capacity to adapt to climate impacts Unsure Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. 622
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 4-10

4.5 INTEGRATION REVIEW
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as general planning and capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future.

Resources listed at the end of this annex were used to provide information on integration. The progress reporting process described in Volume 1 of the hazard mitigation plan will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration.

4.5.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs:

County of Ventura Hazard Mitigation Plan
City of Moorpark Emergency Operations Plan
City of Moorpark General Plan, Safety Element (2001)

4.5.2 Opportunities for Future Integration
The capability assessment in this annex indicates opportunities to integrate this mitigation plan with other jurisdictional planning/regulatory capabilities. Capabilities were identified as integration opportunities if they can support or enhance the actions identified in this plan or be supported or enhanced by components of this plan. The capability assessment identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future:

City of Moorpark General Plan—The City of Moorpark is engaged in a comprehensive update to the General Plan and zoning ordinance that will include a full evaluation of potential hazards, climate issues, and Program Environmental Impact Report.

Taking action to integrate each of these programs with the hazard mitigation plan was considered as a mitigation action to include in the action plan in this annex.

4.6 RISK ASSESSMENT

4.6.1 Jurisdiction-Specific Natural Hazard Event History Table 4-11 lists past occurrences of natural hazards for which specific damage was recorded in this jurisdiction Other hazard events that broadly affected the entire planning area, including this jurisdiction, are listed in the risk assessments in Volume 1 of this hazard mitigation plan. 623

4. City of Moorpark
4-11
Table 4-11.Past Natural Hazard Events
Type of Event
FEMA
Disaster # Date Damage Assessment
COVID-19 Pandemic DR-4482 January 20, 2020 and continuing COVID-19 Pandemic Maria Fire FM-5302-CA 11/1/2019 $6,199,112.56
Easy Fire FM-5298-CA 10/30/2019 $2,833,870.64
Heat Event N/A 7/4/2018 to 7/6/2018 Extreme 2-day heat event broke records across the county.

Thomas Fire FM-5224 December 4, 2017 Unknown
Winter Storms N/A 2/17/2017 to 2/18/2017Rainfall amounts from 2 to 6 inches across coastal areas with up to around 10 inches in the local mountains
produced numerous reports of flash flooding as well as
mud and debris flows. Strong southerly winds with gusts up to 70 mph reported in some areas.

Guiberson Fire FM-2839-CA 9/22/2009 $8,033,270.01
Flash Flood N/A January 25, 2008 California Highway Patrol reported heavy rain and flash flooding near the community of Moorpark. Reports
indicated flash flooding along Tierra Rejada Drive at
Hillside Drive.

Severe Freeze EventDR-1689 1/11/2007 to 1/17/2007 4 nights of below freezing temperatures.

Shekell Fire FM-2681-CA 12/3/2006 $1,153,198.47
Winter Storms DR1577 1/7/2005 to 1/11/2005 Major roads including Highways 101, 126, 33 and 150 were closed for more than a week due to severe flooding Wildfires, Flooding,
Mudflow and Debris
Flow
DR-1498 October 21, 2003 –March 31, 2003 Unknown
1928 St. Francis Dam
Failure
N/A 3/12/1928 >530 people died; bridges, orchards, farms, homes all eradicated in flood’s path down the Santa Clara river
valley to the Pacific Ocean.

4.6.2 Hazard Risk Ranking
Table 4-12 presents a local ranking of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property, and the economy. Mitigation actions primarily target hazards with high and medium rankings.

Table 4-12.Hazard Risk Ranking
Rank Hazard Risk RankingScore Risk Category
1 Wildfire 36 High
1 Landslide 36 High
3 Earthquake 32 Medium
4 Dam Failure 26 Medium
5 Severe Weather 24 Medium
5 Severe Storms 24 Medium
7 Flooding 18 Medium
8 Drought 9 Low
624
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 4-12

4.6.3 Jurisdiction-Specific Vulnerabilities
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. This section provides information on a few key vulnerabilities for this jurisdiction. Available jurisdiction-specific risk maps of the hazards are provided at the end of this annex.

Repetitive Loss Properties
Repetitive loss records are as follows:

Number of FEMA-identified Repetitive-Loss Properties: 0 Number of FEMA-identified Severe-Repetitive-Loss Properties: 0 Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 0
Other Noted Vulnerabilities
The following jurisdiction-specific issues have been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources:

Loss of power due to human action (PSPS).

At least 10 PSPS events affected the city during 2020, including several events that lasted for multiple days.

Traffic signals were affected.

City Hall itself was left on backup power for several days.

Police Service Facility has a lack of reliable power due to a faulty power switchover device.

City was unable to provide a cooling center to residents due to a lack of power.

A charity using a City Facility to conduct food bank operations is susceptible to loss of perishable items due to power outages.

Frequent urban flooding at the intersection of Millard St. and Sherman Ave.

Mitigation actions addressing these issues were prioritized for consideration in the action plan in this annex.

4.7 STATUS OF PREVIOUS PLAN ACTIONS
Table 4-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared. 625

4. City of Moorpark
4-13
Table 4-13.Status of Previous Plan Actions
Removed;
Carried Over to Plan
Update
Action Item Completed
No Longer
Feasible
Check if
Yes
Action # in
Update
OA 1—Integrate the hazard analysis and mitigation strategy with the General Plan’s Safety Element.

MPK-2
Comment:General Plan update including safety element is underway.

OA 6—Develop a public outreach program that informs property owners located in the dam and levee failure inundation areas about voluntary flood insurance.

MPK-7
Comment:Public Works requires additional staff resources to complete this Action.

OA 7—Develop a water conservation public outreach program to increase awareness about the drought, fines and penalties for overuse and solutions for conserving water.

Comment:Done in concert with Calleguas MWD. Most recently implemented a drought impact plan on 7/01/15.

OA 8—Adopt emergency water conservation measures and/or water conservation ordinance to limit irrigation.

Comment:MMC 15.23.010 was amended most recently on 12/18/19.

OA 10—Seismically retrofit or upgrade seismically deficient government facilities and pre-identified shelter facilities.

MPK-1
Comment:City Hall will likely be changing location to a seismically suitable facility in the near future OA 19—Maintain vegetation management program that provides vegetation management services to elderly, disabled, or low-income property owners who lack the resources to remove flammable vegetation from around their homes.

MPK-8
Comment:City requires additional staff resources to complete this action item.

MP 1—Generators: Purchase and install back-up generators for 3 facilities, one of which is often used by Ventura County Fire and Sheriff as an Incident Command Center and serves as an alternate Emergency Operation Center (EOC) for the City (Capital Improvement Project 7710)
Comment:Completed in 2009.

MP 2—Hazardous Mitigation Planning: Modify current Neighborhood and Business Watch Programs with focus on electronic format including real-time information exchange between law enforcement and the community
Comment:Completed in 2016.

MP 3—Wildfire Mitigation: Work with Ventura County Fire to consider siting/planning for a new fire station by Moorpark College (east end of City) Comment:Placement of new fire station under consideration by City and VCFPD.

MP 4—Mitigation Reconstruction: Reconstruct fire sprinkler system for the Community Center facility
Comment:Use of Community Center Facility may be modified or discontinued when City Hall changes location so this action is no longer feasible.

4.8 HAZARD MITIGATION ACTION PLAN
Table 4-14 lists the identified actions, which make up the hazard mitigation action plan for this jurisdiction. Table 4-15 identifies the priority for each action. Table 4-16 summarizes the mitigation actions by hazard of concern and mitigation type.
626
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 4-14
Table 4-14.Hazard Mitigation Action Plan Matrix
BenefitsNew or
Existing Assets Objectives Met Lead Agency
Support
Agency
Estimated
Cost Sources of FundingTimelinea
Action MPK-1—Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.

Hazards Mitigated:Wildfire, Landslide, Earthquake, Dam Failure, Severe Weather, Severe Storms, Flooding Existing 2, 6, 9, 10, 11 City of Moorpark N/A High Grant Funding-FEMA

HMA (BRIC, FMA,
HMGP)
Short-term
Action MPK-2—Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community, including the City’s Emergency Operations Plan and General Plan.

Hazards Mitigated:Wildfire, Landslide, Flooding
New & Existing1, 2, 3, 4, 5, 7, 8, 9, 10, 11, 12, 13,
14, 15, 17, 19
City of Moorpark N/A Low Staff Time, General
Funds
Ongoing
Action MPK-3—Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.

Hazards Mitigated:Wildfire, Landslide, Earthquake, Dam Failure, Severe Weather, Severe Storms, Flooding, Drought New & Existing 1, 2, 4, 6, 7, 8, 9, 11, 12, 13, 14, 15 City of Moorpark N/A Low Staff Time, General Funds
Short-term
ActionMPK-4—Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements:

Enforce the flood damage prevention ordinance.

Participate in floodplain identification and mapping updates.

Provide public assistance/information on floodplain requirements and impacts.

Hazards Mitigated:Flooding, Dam Failure
New & Existing 1, 2, 6, 7, 17 City of Moorpark N/A Low Staff Time, General Funds
Ongoing
Action MPK-5—Identify and pursue strategies to increase adaptive capacity to climate change including but not limited to the following:

Climate Action Element of General Plan Update.

Consider a goal or policy to establish Reach Building Codes with the General Plan Update Consider inclusion of a Climate Action Plan following the General Plan Update Hazards Mitigated:Severe Weather, Severe Storms, Wildfire, Flooding, Drought New & Existing1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12,
13, 14, 15, 16, 19
City of Moorpark N/A Low Staff Time, General
Funds
Short-term
Action MPK-6—Purchase generators for critical facilities and infrastructure that lack adequate backup power.

Hazards Mitigated:Dam Failure, Earthquake, Flooding, Landslide, Severe Weather, Wildfire, Severe Storms Existing 2, 6, 19 City of Moorpark N/A Medium Grant Funding-FEMA

HMA (BRIC, HMGP),
Staff Time, General
Funds
Short-term
Action MPK-7—Provide reliable back up power for the Police Service Facility.

Hazards Mitigated:Wildfire, Landslide, Earthquake, Dam Failure, Severe Weather, Severe Storms, Flooding Existing 2, 6, 19 City of Moorpark N/A Medium Grant Funding-FEMA

HMA (BRIC, HMGP),
Staff Time, General
Funds
Short-term
Action MPK-8—Develop a public outreach program that informs property owners located in the dam and levee failure inundation areas about voluntary flood insurance.

Hazards Mitigated:Flooding
New & Existing 7, 17 City of Moorpark N/A Low Staff Time, General Funds
Ongoing
627

4. City of Moorpark
4-15
BenefitsNew or
Existing Assets Objectives Met Lead Agency
Support
Agency
Estimated
Cost Sources of FundingTimelinea
Action MPK-9—Maintain vegetation management program that provides vegetation management services to elderly, disabled, or low- income property owners who lack the resources to remove flammable vegetation from around their homes.

Hazards Mitigated:Wildfire
New & Existing 5, 10, 13, 17 City of Moorpark VCFPD Medium Staff Time, General Funds
Ongoing
Action MPK-10—Proceed with construction of a storm drain to address flooding issues at Millard St. and Sherman Ave (CIP #504) Hazards Mitigated:Flooding
Existing 2, 6, 8 City of MoorparkCaltrans Medium Grant Funding-FEMA

HMA (BRIC, FMA,
HMGP), Staff Time,
General Funds
Long-term
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date
Acronyms used here are defined at the beginning of this volume.

Table 4-15.Mitigation Action Priority
Action #
# of
Objectives
Met BenefitsCosts
Do Benefits
Equal or
Exceed Cost?
Is Project
Grant-
Eligible?
Can Project Be Funded
Under Existing
Programs/ Budgets?
Implementation
Prioritya
Grant
Pursuit
Prioritya
1 5 High High Yes Yes No Medium High
2 16 Medium Low Yes No Yes High Low
3 12 Low Low Yes No Yes High Low
4 5 Medium Low Yes No Yes High Low
5 17 Medium Low Yes No Yes High Medium
6 3 High Medium Yes Yes No Medium High
7 3 High Medium Yes Yes No Medium High
8 2 Low Low Yes No Yes High Low
9 4 MediumMedium Yes No Yes High Low
10 3 MediumMedium Yes Yes Yes High Medium
a. See the introduction to this volume for explanation of priorities. 628
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 4-16
Table 4-16.Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention
Property
Protection
Public
Education &
Awareness
Natural
Resource
Protection
Emergency
Services
Structural
Projects
Climate
Resilience
Community
Capacity
Buildingb
High-Risk Hazards
Wildfire MPK-2 MPK-1 MPK-2, 3 MPK-9 MPK-6, 7 MPK-5 MPK-2, 3, 5, 9 Landslide MPK-2 MPK-1 MPK-2, 3 MPK-6, 7 MPK-2, 3
Medium-Risk Hazards
Earthquake MPK-1 MPK-3 MPK-6, 7 MPK-3
Dam Failure MPK-4 MPK-1 MPK-3 MPK-6, 7 MPK-3, 4
Severe Weather MPK-1 MPK-3 MPK-6, 7 MPK-5 MPK-3, 5
Severe Storms MPK-1 MPK-3 MPK-6, 7 MPK-5 MPK-3, 5
Flooding MPK-2, 4 MPK-1 MPK-2, 3, 8 MPK-6, 7 MPK-10 MPK-5 MPK-2, 3, 4, 5 Low-Risk Hazards
Drought MPK-3 MPK-5 MPK-3, 5
a. See the introduction to this volume for explanation of mitigation types. b. Note that the jurisdiction did not identify a need for expansion of financial capabilities, based on existing capabilities. The intent of this hazard mitigation plan is to expand the financial capability of the jurisdiction.

4.9 PUBLIC OUTREACH
Table 4-17 lists public outreach activities for this jurisdiction.

Table 4-17.Local Public Outreach
Local Outreach Activity Date
Number of People
Involved
Community Emergency Response Team Ongoing 10-20

4.10 INFORMATION SOURCES USED FOR THIS ANNEX
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex.

Moorpark Municipal Code—The municipal code was reviewed for the full capability assessment and for identifying opportunities for action plan integration.

Moorpark Flood Damage Prevention Ordinance—The flood damage prevention ordinance was reviewed for compliance with the National Flood Insurance Program.

Moorpark Emergency Operations Plan—the Emergency Operations plan was examined for consistency with the County EOP and this Hazard Mitigation Plan.

The following outside resources and references were reviewed:

Hazard Mitigation Plan Annex Development Toolkit—The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan.
629
Moorpark Simi Valley
Thousand Oaks
118
23 23
118
23 Food, Water, Shelter
Safety and Security
Major Roads
Selected City
Incorporated Cities
County Boundary
Data Sources: Ventura Co., VCFD,
Casitas MWD, Calleguas MWD,
City of Camarillo, CA Energy
Commission, Cal Trans, EPA,
HIFLD, Esri
Moorpark
Critical Facilities (1 of 2)
0 0.65 1.30.325 Miles
630
Moorpark Simi Valley
Thousand Oaks
118
23 23
118
23 Communications
Energy
Hazardous Material
Transportation
Major Roads
Selected City
Incorporated Cities
County Boundary
Data Sources: Ventura Co., VCFD,
Casitas MWD, Calleguas MWD,
City of Camarillo, CA Energy
Commission, Cal Trans, EPA,
HIFLD, Esri
Moorpark
Critical Facilities (1 of 2)
0 0.65 1.30.325 Miles
631
Moorpark Simi Valley
Thousand Oaks
118
23 23
118
23 Data Sources: Ventura Co.,
CA DWR, Esri
Moorpark
Dam Failure
Inundation Areas
0 0.65 1.30.325 Miles
Combined Inundation
Areas
Major Roads
Selected City
Incorporated Cities
County Boundary
632
Moorpark Simi Valley
Thousand Oaks
118
23 23
118
23 Data Sources: Ventura Co.,
CGS, Esri
Moorpark
NEHRP Soil Class
0 0.65 1.30.325 Miles
C (Dense soil/soft rock)
D (Stiff soil)
Major Roads
Selected City
Incorporated Cities
County Boundary
633
Moorpark Simi Valley
Thousand Oaks
118
23 23
118
23 Data Sources: Ventura Co.,
Esri
Moorpark
Liquefaction Susceptibility
0 0.65 1.30.325 Miles
Liquefaction zone
Major Roads
Selected City
Incorporated Cities
County Boundary
634
Moorpark Simi Valley
Thousand Oaks
118
23 23
118
23 Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Moorpark
100-Year Probabilistic
Earthquake Scenario
0 0.65 1.30.325 Miles
Mercalli Intensity Scale
VII (Very Strong/Moderate)
Major Roads
Selected City
Incorporated Cities
County Boundary
635
Moorpark Simi Valley
Thousand Oaks
118
23 23
118
23 Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Moorpark
Oak Ridge M7.16
Earthquake Scenario
0 0.65 1.30.325 Miles
Mercalli Intensity Scale
VII (Very Strong/Moderate)
VIII (Severe/Moderate-Heavy)
Major Roads
Selected City
Incorporated Cities
County Boundary
636
Moorpark Simi Valley
Thousand Oaks
118
23 23
118
23 Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Moorpark
Pitas Point M7.12
Earthquake Scenario
0 0.65 1.30.325 Miles
Mercalli Intensity Scale
VI (Strong/Light)
VII (Very Strong/Moderate)
Major Roads
Selected City
Incorporated Cities
County Boundary
637
Moorpark Simi Valley
Thousand Oaks
118
23 23
118
23 Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Moorpark
San Cayetano M7.16
Earthquake Scenario
0 0.65 1.30.325 Miles
Mercalli Intensity Scale
VII (Very Strong/Moderate)
VIII (Severe/Moderate-Heavy)
Major Roads
Selected City
Incorporated Cities
County Boundary
638
Moorpark Simi Valley
Thousand Oaks
118
23 23
118
23 Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Moorpark
S. San Andreas M8.03
Earthquake Scenario
0 0.65 1.30.325 Miles
Mercalli Intensity Scale
VI (Strong/Light)
Major Roads
Selected City
Incorporated Cities
County Boundary
639
Moorpark Simi Valley
Thousand Oaks
118
23 23
118
23 Data Sources: Ventura Co.,
FEMA, Esri
Moorpark
FEMA Flood Hazard Areas
0 0.65 1.30.325 Miles
1% Annual Chance
Flood (100-Year)

0.2% Annual Chance
Flood (500-Year)
Major Roads
Selected City
Incorporated Cities
County Boundary
640
Moorpark Simi Valley
Thousand Oaks
118
23 23
118
23 Data Sources: Ventura Co.,
CGS, Esri
Moorpark
Susceptibility to
Deep-Seated Landslides
0 0.65 1.30.325 Miles
Low
Moderate
High
Very High
Major Roads
Selected City
Incorporated Cities
County Boundary
641
Moorpark Simi Valley
Thousand Oaks
118
23 23
118
23 Data Sources: Ventura Co.,
CAL FIRE, Esri
Moorpark
Wildfire Hazard
Severity Zones
0 0.65 1.30.325 Miles
Moderate
High
Very High
Major Roads
Selected City
Incorporated Cities
County Boundary
642
643
5-1

5. CITY OF OJAI

5.1 LOCAL HAZARD MITIGATION PLANNING TEAM
Primary Point of Contact Alternate Point of Contact
James Vega, City Manager
401 S. Ventura Street
Ojai, CA 93023
Telephone: (805) 646-5581 ext. 102
e-mail Address: [email protected]
Alma Quezada, Interim Public Works
Director
408 S. Signal Street
Ojai, CA 93023
Telephone: (805) 646-5581 ext. 209
e-mail Address:
[email protected]
This annex was developed by the local hazard mitigation planning team, whose members are listed in Table 5-1.

Table 5-1.Local Mitigation Planning Team Members
Name Title
James Vega City Manager
Lucas Seibert Community Development Director
Alma Quezada Interim Public Works Director
Andrea Mackey Management Analyst
James Hahn Technical Support Specialist
Juan Morales Interim Public Works Supervisor

5.2 JURISDICTION PROFILE

5.2.1 Location and Features
The City of Ojai is located in the Ojai Valley. The current boundaries generally extend from Villanova Road to Boardman Road, encompassing an area of 4.37 square miles.

Ojai is a small town thatis a known as a tourist destination for its boutique hotels, recreation opportunities, hiking, and farmer’s market of local organic agriculture. It is home to the annual Ojai Music Festival and the Ojai Tennis Tournament.
644
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 5-2

5.2.2 History
City of Ojai was incorporated in 1921. The town was originally named Nordhoff in 1874 but was later changed to Ojai in 1917. Edward Libbey of Libbey Glass Company built the Spanish-style downtown Arcade and park that exist today.

5.2.3 Governing Body Format
The City of Ojai is a Council-Manager form of government with five Council members elected by district.

The City consists of five departments: Community Development, Finance, Public Works, Recreation, and the City Manager’s office. The City Council assumes responsibility for the adoption of this plan; the City Manager will oversee its implementation.

5.3 CURRENT TRENDS

5.3.1 Population
According to the California Department of Finance, the population of the City of Ojai as of January 2020 was 7,450. Since 2010, the population has grown at an average annual rate of 0.13 percent.

5.3.2 Development
Anticipated future development for the City of Ojai is low to moderate. Recent development has been mostly infill. There has been a focus on accessory dwelling units. Future growth in the City will be managed as identified in the City’s upcoming General Plan. City Actions such as those relating to land use, annexations, zoning, subdivision and design review, redevelopment, and capital improvements, must be consistent with the plan.

Table 5-2 summarizes development trends in the period since the preparation of the previous hazard mitigation plan, as well as expected future development trends.

5.4 CAPABILITY ASSESSMENT
This section describes an assessment of existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning.

Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table in this annex identifies these as community capacity building mitigation actions. 645

5. City of Ojai
5-3
Table 5-2.Recent and Expected Future Development Trends Criterion Response
Has your jurisdiction annexed any land since the
preparation of the previous hazard mitigation plan?
No
Is your jurisdiction expected to annex any areas
during the performance period of this plan?
No
Are any areas targeted for development or major
redevelopment in the next five years?
Yes
If yes, briefly describe, including whether any of
the areas are in known hazard risk areas
Chaparral School site at 414 E. Ojai Avenue

DESIGN CONCEPT
Ojai Town Square development celebrates Ojai as the unique and special place that it is. The development responds to this character as a bookend to the Arcade and town center, enhancing the pedestrian neighborhood linked with outdoor spaces and surrounding public-oriented program uses.

The architectural expression is inspired by historic structures on the site as well as the statement of theme defined by City Ordinance. The concept finds the balance of history and future in a way that is distinctly ‘‘of Ojai.”

PROGRAM HIGHLIGHTS
Establish a ±200 room hotel.

Provide Residential Housing: Market Senior, Affordable.

Creating pedestrian-friendly gardens throughout the site.

Activate historic structures on Ojai Avenue for retail and restaurant use.

Provide ample parking to support the on-site activities.

Maintain the skate park as built
Provide additional community programming opportunities.

Maintain 35 height limit to new structures.

How many permits for new construction were issued
in your jurisdiction since the preparation of the
previous hazard mitigation plan?
2016 2017 2018 2019 2020
437 419 438 432 23
Provide the number of new-construction permits for
each hazard area or provide a qualitative description
of where development has occurred.

One replacement single-family dwelling, 22 Accessory Dwelling Units, 2 by new construction, 7 by conversion, 13 legalized through the Compliance program.

Describe the level of buildout in the jurisdiction,
based on your jurisdiction’s buildable lands
inventory. If no such inventory exists, provide a
qualitative description.

The City is largely builtout within city limits. The remaining pockets of infill land development opportunities within city limits are sprinkled throughout the City and respective zoning districts with smaller lots, which typically present some level of developable challenges.

The findings of the capability assessment are presented as follows:

Table 5-3 presents an assessment of planning and regulatory capabilities Table 5-4 presents development and permitting capabilities Table 5-5 presents an assessment of fiscal capabilities Table 5-6 presents an assessment of administrative and technical capabilities Table 5-7 presents an assessment of education and outreach capabilities Table 5-8 presents information on National Flood Insurance Program (NFIP) compliance Table 5-9 presents classifications under various community mitigation programs Table 5-10 presents the community’s adaptive capacity for the impacts of climate change 646
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 5-4
Table 5-3.Planning and Regulatory Capability
Local
Authority
Other Jurisdiction
Authority
State
Mandated
Integration
Opportunity?
Codes, Ordinances, & Requirements
Building Code Yes No Yes Yes
Comment:OMC 9-1.102(§ 1, Ord. 718, eff. April 25, 1997) Zoning Code Yes No No Yes
Comment:OMC 10-2.202(§ 3, Ord. 771, eff. February 13, 2004, as amended by § 1, Ord. 787, eff. February 10, 2006, § 2, Ord. No. 827, eff. June 28, 2013)
Subdivisions Yes Yes Yes No
Comment:OMC 10-3.301 (§ 2, Ord. 637, eff. January 9, 1986) Stormwater Management Yes Yes Yes Yes
Comment:OMC 5-12.101 Co-permittee with the Ventura County Flood Control District Post-Disaster Recovery No No No No
Comment:None
Real Estate Disclosure No Yes Yes No
Comment:OMC 4-11.12 (§ 1, Ord. 738, eff. July 22, 1999, as amended by § 1, Ord. 744, eff. March 24, 2000, as renumbered by § 2, Ord. 800, eff. August 8, 2008)
Growth Management Yes No No Yes
Comment:OMC 10-6.101(§ 1, Ord. 769, eff. January 8, 2004) Site Plan Review Yes No No Yes
Comment:OMC 10-2.101(§ 3, Ord. 771, eff. February 13, 2004) Environmental Protection No No No No
Comment:None
Flood Damage Prevention Yes Yes No Yes
Comment:OMC 9-9.101(§ 1, Ord. 655, eff. May 19, 1988, as amended by § 2, Ord. 914, eff. March 24, 2021) Emergency Management Yes Yes Yes Yes
Comment:OMC 3-1.01(Part 2, Ord. 468, eff. March 29, 1973) Climate Change No No No No
Comment:None
Planning Documents
General Plan Yes No Yes Yes
Is the plan compliant with Assembly Bill 2140?No
Comment:Currently being updated
Capital Improvement Plan Yes No No Yes
How often is the plan updated?Annually
Comment:

Disaster Debris Management Plan No No No No
Comment:None
Floodplain or Watershed Plan Yes Yes No Yes
Comment:The city participates in the NFIP.

Stormwater Plan Yes Yes Yes Yes
Comment:Ventura Countywide Storm Water Quality Management Program todischarge wastesfor municipal storm water and urban runoff discharges under waste discharge requirements contained in Order No. 94-082, adopted on July 27, 2000 Urban Water Management Plan No Yes Yes No
Comment:Casitas Municipal Water District
Habitat Conservation Plan No No No No
Comment:None
647

5. City of Ojai
5-5
Local
Authority
Other Jurisdiction
Authority
State
Mandated
Integration
Opportunity?
Economic Development Plan Yes No No No
Comment:General Plan guides economic growth
Shoreline Management Plan No No No No
Comment:None
Community Wildfire Protection Plan No Yes No No
Comment:Ventura County Community Wildfire Protection Plan, 2010 Forest Management Plan Yes No No No
Comment:City of Ojai Community Forest Management Plan
Climate Action Plan No No No No
Comment:None
Comprehensive Emergency Management Plan Yes Yes Yes Yes Comment:Emergency Operations Plan (EOP), 2013
Threat & Hazard Identification & Risk Assessment (THIRA)No No No No Comment:Not a stand-alone plan, but addressed in the EOP Post-Disaster Recovery Plan No No No No
Comment:None
Continuity of Operations Plan No No No No
Comment:Not a stand-alone plan, but addressed in the EOP Public Health Plan No Yes Yes No
Comment:Ventura County Public Health Emergency Response Plan, 2019 Table 5-4.Development and Permitting Capability
Criterion Response
Does your jurisdiction issue development permits? Yes
If no, who does? If yes, which department?Community Development Department Does your jurisdiction have the ability to track permits by hazard area? Yes Does your jurisdiction have a buildable lands inventory? No Table 5-5.Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants Yes
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes Yes
User Fees for Water, Sewer, Gas or Electric Service No
Incur Debt through General Obligation Bonds No
Incur Debt through Special Tax Bonds No
Incur Debt through Private Activity Bonds No
Withhold Public Expenditures in Hazard-Prone Areas No
State-Sponsored Grant Programs Yes
DevelopmentImpact Fees for Homebuyers or Developers Yes 648
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 5-6
Table 5-6.Administrative and Technical Capability
Staff/Personnel Resource Available?
Planners or engineers with knowledge of land development and land management practicesYes If Yes, Department /Position:Community Development Dept./ City Planner Engineers or professionals trained in building or infrastructure construction practices Yes If Yes, Department /Position:Community Development Dept./ Building Official Planners or engineers with an understanding of natural hazards Yes If Yes, Department /Position:Community Development Dept. / City Planner Staff with training in benefit-cost analysis Yes
If Yes, Department /Position:Finance Dept./ Finance Director Surveyors No
Personnel skilled or trained in GIS applications No
Scientist familiar with natural hazards in local area No Emergency manager Yes
If Yes, Department /Position:City Manager’s Office/ City Manager Grant writers No
Other No
If Yes, Department /Position:

Table 5-7.Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? No Do you have personnel skilled or trained in website development? No Do you have hazard mitigation information available on your website? Yes If yes, briefly describe:ojai.ca.gov › emergency-preparedness Do you use social media for hazard mitigation education and outreach? Yes If yes, briefly describe:Post pertinent information as required Do you have any citizen boards or commissions that address issues related to hazard mitigation?Yes If yes, briefly describe:The City of Ojai Disaster Council Do you have any other programs in place that could be used to communicate hazard-related information?Yes If yes, briefly describe:City Website, City smart phone App, government access TV channel, AM radio station Do you have any established warning systems for hazard events? Yes If yes, briefly describe:City Website, City smart phone App, government access TV channel, AM radio station Table 5-8.National Flood Insurance Program Compliance
Criterion Response
Whatlocaldepartment is responsible for floodplain management? Public Works Department Who is your floodplain administrator? (department/position) Public Works Dept. / Public Works Director
Are any certified floodplain managers on staff in your jurisdiction? No What is the date thatyour flood damage prevention ordinancewas last amended? 3/24/2021 Does your floodplain management program meet or exceed minimum requirements? Meet When was the most recent Community Assistance Visit or Community Assistance Contact?
N/A
649

5. City of Ojai
5-7
Criterion Response
Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed?
No
Are any RiskMAP projects currently underway in your jurisdiction? No Do your flood hazard maps adequately address the flood risk within your jurisdiction?Yes Does your floodplain management staff need any assistance or training to support its floodplain management program?
Yes
If so, what type of assistance/training is needed?Ongoing training Does your jurisdiction participate in the Community Rating System (CRS)? No If no, is your jurisdiction interested in joining the CRS program?Possibly How many flood insurance policies are in force in your jurisdiction?a 79 What is the insurance in force?$25,299,000
What is the premium in force?$41,007
How many total loss claims have been filed in your jurisdiction?a 43 What were the total payments for losses?$223,301
a. According to FEMA statistics as of March 31, 2021
Table 5-9.Community Classifications
Participating? Classification Date Classified
FIPS Code Yes 0611153476 N/A
DUNS # Yes 085921781 N/A
Community Rating System No N/A N/A
Building Code Effectiveness Grading Schedule No N/A N/A Public Protection, contract with VCFPD Yes 03/3X 12/21/2018 Storm Ready No N/A N/A
Firewise No N/A N/A
Tsunami Ready No N/A N/A
Table 5-10.Adaptive Capacity for Climate Change
Criterion
Jurisdiction
Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts High Comment: City is aware of current drought issues and potential wildfire issues Jurisdiction-level monitoring of climate change impacts Low Comment:

Technical resources to assess proposed strategies for feasibility and externalities Low Comment:

Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment:

Capital planning and land use decisions informed by potential climate impacts Low Comment:

Participation in regional groups addressing climate risks Low Comment:
650
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 5-8
Criterion
Jurisdiction
Ratinga
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Low Comment:

Identified strategies for greenhouse gas mitigation efforts Low Comment:

Identified strategies for adaptation to impacts Low
Comment:

Champions for climate action in local government departments Low Comment:

Political support for implementing climate change adaptation strategies Low Comment:

Financial resources devoted to climate change adaptation Low Comment:

Local authority over sectors likely to be negative impacted Low Comment:

Public Capacity
Local residents’ knowledge of and understanding of climate risk High Comment:Water use reduction due to drought
Local residents’ supportof adaptation efforts High
Comment:Installation and use of solar power
Local residents’ capacity to adapt to climate impacts High Comment:Water conservation
Local economy current capacity to adapt to climate impacts Low Comment:

Local ecosystems capacity to adapt to climate impacts Unsure Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.

5.5 INTEGRATION REVIEW
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as general planning and capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future.

Resources listed at the end of this annex were used to provide information on integration. The progress reporting process described in Volume 1 of the hazard mitigation plan will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration.

5.5.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs:

Building Code 9-1.102
Capital Improvement Plan—Includes projects that can help mitigate potential hazards. 651

5. City of Ojai
5-9

5.5.2 Opportunities for Future Integration
The capability assessment in this annex indicates opportunities to integrate this mitigation plan with other jurisdictional planning/regulatory capabilities. Capabilities were identified as integration opportunities if they can support or enhance the actions identified in this plan or be supported or enhanced by components of this plan. The capability assessment identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future:

General Plan—Consider new update to the Housing Element Emergency Operations Plan (EOP), 2013—Assesses threats from natural hazards that could impact the City.

Taking action to integrate each of these programs with the hazard mitigation plan was considered as a mitigation action to include in the action plan in this annex.

5.6 RISK ASSESSMENT

5.6.1 Jurisdiction-Specific Natural Hazard Event History Table 5-11 lists past occurrences of natural hazards for which specific damage was recorded in this jurisdiction Other hazard events that broadly affected the entire planning area, including this jurisdiction, are listed in the risk assessments in Volume 1 of this hazard mitigation plan.

Table 5-11.Past Natural Hazard Events
Type of Event FEMA Disaster # Date Damage Assessment
COVID-19 Pandemic DR-4482 1/20/2020 and continuing $3-4 million in lost revenue Thomas Fire FM-5224 12/4/2017 No structures lost, City activated Emergency Operation Center, major impact to City
Pine Fire 6/30/2016 Unknown
Severe Storms, Flooding,
Debris Flows, and Mudslides
DR-1577 1/9/2005 Impacted City. Daly park and surrounding homes in neighborhood affected by mud
Wolf Fire 6/1/2002 Unknown
Lightning Strike 4/18/2000 One residential home struck
Flood/Landslide 2/20/2000 Unknown
Ranch Fire 12/21/1999 Unknown

5.6.2 Hazard Risk Ranking
Table 5-12 presents a local ranking of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property, and the economy. Mitigation actions primarily target hazards with high and medium rankings. The drought hazard has been increased from low to high to match Casitas Municipal Water District, City of Ojai’s water purveyor, and to better reflect local knowledge. The City is vulnerable to drought as it is dependent on Lake Casitas for water. As of October 2021, Lake Casitas is at 33% capacity—a Stage 3 drought. If lake level is reduced to 30% or less, CMWD would implement Stage 4. 652
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 5-10
Table 5-12.Hazard Risk Ranking
Rank Hazard Risk Ranking Score Risk Category
1 Landslide 33 High
2 Earthquake 32 High
3 Drought 30 High
4 Severe Storms 24 Medium
5 Severe Weather 24 Medium
6 Wildfire 18 Medium
7 Flooding 18 Medium
8 Dam Failure 12 Low

5.6.3 Jurisdiction-Specific Vulnerabilities
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. This section provides information on a few key vulnerabilities for this jurisdiction. Available jurisdiction-specific risk maps of the hazards are provided at the end of this annex.

Repetitive Loss Properties
Repetitive loss records are as follows:

Number of FEMA-identified Repetitive-Loss Properties: 0 Number of FEMA-identified Severe-Repetitive-Loss Properties: 0 Number of Repetitive-Loss or Severe-Repetitive-Loss Properties that have been mitigated: 0 Other Noted Vulnerabilities
The following jurisdiction-specific issues have been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources:

The City Recreation Department is the only Cooling Center in the City. If there is a Public Safety Power Shut-off (PSPS) then a generator is necessary.

Urban flooding with storm drain issues
Mitigation actions addressing these issues were prioritized for consideration in the action plan in this annex.

5.7 STATUS OF PREVIOUS PLAN ACTIONS
Table 5-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared. 653

5. City of Ojai
5-11
Table 5-13.Status of Previous Plan Actions
Removed;
Carried Over to Plan
Update
Action Item Completed
No Longer
Feasible
Check if
Yes
Action # in
Update
OA 10—Seismically retrofit or upgrade seismically deficient government facilities and pre-identified shelter facilities.

OJC-1
Comment:No action. Lack of funding
OA 11—Develop and implement plans to increase the building owner’s general knowledge of and appreciation for the value of seismic upgrading of the building’s structural and nonstructural elements.

OJC-2
Comment:No action. Lack of staffing
OA 14—Acquire, relocate, or elevate residential structures, in particular those that have been identified as RL properties, within the 100-year floodplain.

OJC-1
Comment:No action. Lack of funding/staff
OA 21—Maintain hazards fuel treatment program for areas that have been identified with overgrown/dead brush/trees to reduce the potential for tree-to-tree ignition. Ensure that a “maintenance now” component to provide continued fire resistance is part of the program.

OJC-8
Comment:Ongoingtree and brush clearing for fire abatement

5.8 HAZARD MITIGATION ACTION PLAN
Table 5-14 lists the identified actions, which make up the hazard mitigation action plan for this jurisdiction. Table 5-15 identifies the priority for each action. Table 5-16 summarizes the mitigation actions by hazard of concern and mitigation type.

Table 5-14.Hazard Mitigation Action Plan Matrix
BenefitsNew or
Existing AssetsObjectives Met Lead AgencySupport Agency Estimated
Cost Sources of FundingTimelinea
Action OJC-1—Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.

Hazards Mitigated:Landslide, Earthquake, Severe Storms, Severe Weather, Wildfire, Flooding, Dam Failure Existing 1, 2, 4, 6, 9, 10, 11,
16 Community
Development Dept
Public Works DeptHigh FEMA HMA (BRIC, FMA,
PDM and HMGP)
Short-term
Action OJC-2—Develop and implement plans to increase the building owner’s general knowledge of and appreciation for the value of seismic upgrading of the building’s structural and nonstructural elements.

Hazards Mitigated:Earthquake
Existing 1, 9, 12, 16, 17 Community
Development Dept
Public Works DeptLow Staff Time, General Funds Short-term Action OJC-3—Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community, including General Plan Update, Emergency Action Plan Hazards Mitigated:Landslide, Earthquake, Severe Storms, Severe Weather,Wildfire, Flooding, Dam Failure New & Existing1, 2, 3, 4, 5, 7, 8, 9,
10, 11, 12, 13, 14,
15, 17, 19
Community
Development Dept
Public Works DeptLow Staff Time, General FundsOngoing
654
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 5-12
BenefitsNew or
Existing AssetsObjectives Met Lead AgencySupport Agency Estimated
Cost Sources of FundingTimelinea
Action OJC-4—Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.

Hazards Mitigated:Landslide, Earthquake, Severe Storms, Severe Weather, Wildfire, Flooding, Dam Failure, Drought New & Existing 1, 2, 4, 6, 7, 8,9, 11,
12, 13, 14, 15
City of Ojai Community
Development Dept
Low Staff Time, General Funds Short-term
Action OJC-5—Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements:

Enforce the flood damage prevention ordinance.

Participate in floodplain identification and mapping updates.

Provide public assistance/information on floodplain requirements and impacts.

Hazards Mitigated:Flooding
New & Existing 1, 2, 6, 7, 17 Public Works Dept Low Staff Time, General FundsOngoing Action OJC-6—Identify and pursue strategies to increase adaptive capacity to climate change.

Hazards Mitigated:Severe Storms, Severe Weather, Wildfire, Flooding, Drought New & Existing 1, 2, 3, 4, 5, 6, 7, 8,
9, 10, 11, 12, 13, 14,
15, 16, 19
Enter ResponseEnter Response Low FEMA HMA (BRIC, FMA,
HMGP), Staff Time,
General Funds
Short-term
Action OJC-7—Purchase generators for critical facilities and infrastructure that lack adequate backup power, including Public Works Dept. and Recreation Dept.

Hazards Mitigated:Earthquake, Flooding, Landslide, Severe Weather, Wildfire Existing 2, 19 Public Works Dept Enter Response High FEMA HMA (BRIC and HMGP), Staff Time,
General Funds
Short-term
Action OJC-8—Maintain wildfire hazard fuel reduction program for areas that have been identified with overgrown or dead brush, trees and weeds to reduce the potential for tree-to-tree ignition. Ensure that a “maintenance now” component to provide continued fire resistance is part of the program. (Coordinates with VCFPD Action VFP-6) Hazards Mitigated:Wildfire
New & Existing2,4,5,6,8,10,11,
13, 14, 15, 18, 19
VCFPD City of Ojai, CAL

FIRE & USDA
Medium FEMA HMA (BRIC, FMAP
and HMGP), Staff Time &
General Funds
Ongoing
Action OJC-9—Determine feasibility of the City of Ojai joining the Community Rating System (CRS) program to enhance public safety, reduce flood damage to property and infrastructure, and reduce flood insurance rates in the community.

Hazards Mitigated:Flooding
New & Existing 1, 2, 19 City of Ojai None Low Staff Time & General Funds
Short-term
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date
Acronyms used here are defined at the beginning of this volume. 655

5. City of Ojai
5-13
Table 5-15.Mitigation Action Priority
Action #
# of
Objectives
Met BenefitsCosts
Do Benefits
Equal or
Exceed Cost?
Is Project
Grant-
Eligible?
Can Project Be Funded
Under Existing
Programs/ Budgets?
Implementation
Prioritya
Grant
Pursuit
Prioritya
1 8 High High Yes Yes No Medium High
2 5 Medium Low Yes No Yes High Low
3 16 Medium Low Yes No Yes High Low
4 12 Low Low Yes No Yes High Low
5 5 Medium Low Yes No Yes High Low
6 17 Medium Low Yes Yes Yes High Medium
7 2 High High Yes Yes No Medium High
8 12 High Medium Yes Yes Yes High High
9 3 Medium Low Yes No Yes High Low
a. See the introduction to this volume for explanation of priorities.

Table 5-16.Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention
Property
Protection
Public
Education &
Awareness
Natural
Resource
Protection
Emergency
Services
Structural
Projects
Climate
Resilience
Community
Capacity
Buildingb
High-Risk Hazards
Landslide OJC-3 OJC-1 OJC-4 OJC-7 OJC-4
Medium-Risk Hazards
Earthquake OJC-3 OJC-1 OJC-2, 4 OJC-7 OJC-4
Severe Storms OJC-3 OJC-1 OJC-4 OJC-6 OJC-4
Severe Weather OJC-3 OJC-1 OJC-4 OJC-7 OJC-6 OJC-4
Wildfire OJC-3 OJC-1 OJC-4 OJC-8 OJC-7 OJC-6 OJC-4
Flooding OJC-3, 5 OJC-1 OJC-4, 5 OJC-7 OJC-6 OJC-4, 5, 9 Low-Risk Hazards
Dam Failure OJC-3 OJC-1 OJC-4 OJC-4
Drought OJC-4 OJC-6 OJC-4
a. See the introduction to this volume for explanation of mitigation types. b. Note that the jurisdiction did not identify a need for expansion of financial capabilities, based on existing capabilities. The intent of this hazard mitigation plan is to expand the financial capability of the jurisdiction.

5.9 PUBLIC OUTREACH
Table 5-17 lists public outreach activities for this jurisdiction.

Table 5-17.Local Public Outreach
Local Outreach Activity Date Number of People Involved
Social Media 8/2020 1,000
656
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 5-14

5.10 INFORMATION SOURCES USED FOR THIS ANNEX
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex.

City of Ojai Municipal Code—The municipal code was reviewed for the full capability assessment and for identifying opportunities for action plan integration.

City of Ojai Flood Damage Prevention Ordinance—The flood damage prevention ordinance was reviewed for compliance with the National Flood Insurance Program.

Capital Improvement Projects Program—The municipal code was reviewed for the full capability assessment.

The following outside resources and references were reviewed:

Hazard Mitigation Plan Annex Development Toolkit—The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan.
657
Ojai
33 33
150
150
Food, Water, Shelter
Health and Medical
Safety and Security
Major Roads
Selected City
Incorporated Cities
County Boundary
Data Sources: Ventura Co., VCFD,
Casitas MWD, Calleguas MWD,
City of Camarillo, CA Energy
Commission, Cal Trans, EPA,
HIFLD, Esri
Ojai
Critical Facilities (1 of 2)
0 0.35 0.70.175 Miles
658
Ojai
33 33
150
150
Communications
Energy
Transportation
Major Roads
Selected City
Incorporated Cities
County Boundary
Data Sources: Ventura Co., VCFD,
Casitas MWD, Calleguas MWD,
City of Camarillo, CA Energy
Commission, Cal Trans, EPA,
HIFLD, Esri
Ojai
Critical Facilities (1 of 2)
0 0.35 0.70.175 Miles
659
Ojai
33 33
150
150
Data Sources: Ventura Co.,
CA DWR, Esri
Ojai
Dam Failure
Inundation Areas
0 0.35 0.70.175 Miles
Combined Inundation
Areas
Major Roads
Selected City
Incorporated Cities
County Boundary
660
Ojai
33 33
150
150
Data Sources: Ventura Co.,
CGS, Esri
Ojai
NEHRP Soil Class
0 0.35 0.70.175 Miles
C (Dense soil/soft rock)
D (Stiff soil)
Major Roads
Selected City
Incorporated Cities
County Boundary
661
Ojai
33 33
150
150
Data Sources: Ventura Co.,
Esri
Ojai
Liquefaction Susceptibility
0 0.35 0.70.175 Miles
Liquefaction zone
Major Roads
Selected City
Incorporated Cities
County Boundary
662
Ojai
33 33
150
150
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Ojai
100-Year Probabilistic
Earthquake Scenario
0 0.35 0.70.175 Miles
Mercalli Intensity Scale
VII (Very Strong/Moderate)
Major Roads
Selected City
Incorporated Cities
County Boundary
663
Ojai
33 33
150
150
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Ojai
Oak Ridge M7.16
Earthquake Scenario
0 0.35 0.70.175 Miles
Mercalli Intensity Scale
VI (Strong/Light)
VII (Very Strong/Moderate)
Major Roads
Selected City
Incorporated Cities
County Boundary
664
Ojai
33 33
150
150
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Ojai
Pitas Point M7.12
Earthquake Scenario
0 0.35 0.70.175 Miles
Mercalli Intensity Scale
VII (Very Strong/Moderate)
VIII (Severe/Moderate-Heavy)
Major Roads
Selected City
Incorporated Cities
County Boundary
665
Ojai
33 33
150
150
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Ojai
San Cayetano M7.16
Earthquake Scenario
0 0.35 0.70.175 Miles
Mercalli Intensity Scale
VII (Very Strong/Moderate)
VIII (Severe/Moderate-Heavy)
Major Roads
Selected City
Incorporated Cities
County Boundary
666
Ojai
33 33
150
150
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Ojai
S. San Andreas M8.03
Earthquake Scenario
0 0.35 0.70.175 Miles
Mercalli Intensity Scale
VI (Strong/Light)
Major Roads
Selected City
Incorporated Cities
County Boundary
667
Ojai
33 33
150
150
Data Sources: Ventura Co.,
FEMA, Esri
Ojai
FEMA Flood Hazard Areas
0 0.35 0.70.175 Miles
1% Annual Chance
Flood (100-Year)

0.2% Annual Chance
Flood (500-Year)
Major Roads
Selected City
Incorporated Cities
County Boundary
668
Ojai
33 33
150
150
Data Sources: Ventura Co.,
CGS, Esri
Ojai
Susceptibility to
Deep-Seated Landslides
0 0.35 0.70.175 Miles
Low
Moderate
High
Very High
Major Roads
Selected City
Incorporated Cities
County Boundary
669
Ojai
33 33
150
150
Data Sources: Ventura Co.,
CAL FIRE, Esri
Ojai
Wildfire Hazard
Severity Zones
0 0.35 0.70.175 Miles
Moderate
High
Very High
Major Roads
Selected City
Incorporated Cities
County Boundary
670
671
6-1

6. CITY OF OXNARD

6.1 LOCAL HAZARD MITIGATION PLANNING TEAM
Primary Point of Contact Alternate Point of Contact
Scott Brewer, Emergency Services Manager
360 West Second Street
Oxnard, CA 93030
Telephone: 805-385-7717
e-mail Address: [email protected]
Alexander Hamilton, Fire Chief
360 West Second Street
Oxnard, CA 93030
Telephone: 805-385-7700
e-mail Address:
[email protected]
This annex was developed by the local hazard mitigation planning team, whose members are listed in Table 6-1.

Table 6-1.Local Mitigation Planning Team Members
Name Title
Alexander Nguyen City Manager
Jason Benites Police Chief
Eric Sonstegard Assistant Police Chief
Alexander Hamilton Fire Chief
John Colamarino Assistant Fire Chief
Brian Yanez Assistant Public Works Director
Mike More Risk Manager
Scott Kolwitz Planning Manager
Betsy George Chief Financial Officer
Terrel Harrison Cultural/Community Services Director
Stephen Fischer City Attorney
Tatiana Arnaout City Engineer/Floodplain Manager
Mike Shaffer GIS Manager
Katie Casey Communications Manager
Kathleen Mallory Planning & Sustainability Manager
Scott Brewer Emergency Services Manager
672
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 6-2

6.2 JURISDICTION PROFILE

6.2.1 Location and Features
The City is located about 60 miles northwest of Los Angeles along a beautiful stretch of the Pacific Ocean coastline. The largest city within Ventura County, Oxnard is the center of a regional agricultural industry and a progressive business center while, at the same time, a relaxed seaside destination with a variety of neighborhoods and community services. Bordered by mountains and the Pacific Ocean, West Ventura County provides a seaside environment with expansive mountain views. Oxnard incorporates both of these attributes through its pattern of relatively compact urban development focused on the downtown, coastline and harbor, and the Highway 101 corridor. The moderate Mediterranean climate, fertile topsoil, and generally adequate groundwater supply lead to year-round agricultural production in the surrounding Oxnard Plain.

The City of Oxnard is located in the County of Ventura. The current boundaries generally extend from the Santa Clara River on the west to Del Norte Blvd on the east, as well as just north of the Highway 101 to the Pacific Ocean on the South, encompassing an area of 27.12 square miles.

6.2.2 History
Oxnard Incorporated: The City Oxnard was incorporated in 1903 by the Ventura County Board of Supervisors, who officially named the city after the Oxnard brothers. The city grew steadily into what is now the largest city in Ventura County, with a population of just over 207,000 residents.

Oxnard History:In 1896, local farmers began experimenting with sugar beets in addition to barley and lima beans. A prominent local farmer, Albert Maulhardt, visited Henry T. Oxnard and his three brothers’ American Beet Sugar factory in Chino, which led him to plant sugar beets for shipment to the plant.

Maulhardt’s success persuaded other ranchers to switch from grain to sugar beets.

Encouraged by a pledge of 18,000 acres of sugar beets from local farmers, the Oxnard brothers completed construction of a sugar beet factory adjacent to the beet fields in 1898 on what was then known as Rancho Colonia. The massive brick factory, with its 150-foot smokestacks, was located a few blocks northeast of a town-site that, five years later, would become the City of Oxnard.

The sugar beet factory was responsible for another significant event—bringing a spur line of the Southern Pacific Railroad to the plant site and passenger service to the community.

6.2.3 Governing Body Format
The City of Oxnard was incorporated as a general law city on June 30, 1903 and operates under a council-manager form of government. The City Council consists of the Mayor and six other Councilmembers. The term of office is four years for all elected officials, with elections held every two years for three City Council seats at a time. All Councilmembers are elected by district except for the Mayor, who is elected at large during presidential election years. The City Treasurer, who is elected Citywide at the same time as the Mayor, invests idle cash and manages the City’s investment portfolio.

The City Clerk, also elected Citywide at the same time as the Mayor and City Treasurer, manages the City Council and Committee meeting agenda process, official records, and elections. 673

6. City of Oxnard
6-3
The Oxnard City Council assumes responsibility for the adoption of this plan; the Oxnard Fire Department along with designated City departments will oversee its implementation.

6.3 CURRENT TRENDS

6.3.1 Population
According to the United States Census Bureau, the population of the City of Oxnard as of January 2020 was 207,887. Since 2010, the population has grown at an average annual rate of 0.48 percent.

6.3.2 Development
The Planning Division coordinates the City’s review of residential, commercial, office, and industrial development projects. This includes working with property owners, developers, business owners, and residents to ensure that their development proposals conform to City policies and guidelines.

Table 6-2 summarizes development trends in the period since the preparation of the previous hazard mitigation plan, as well as expected future development trends.

Table 6-2.Recent and Expected Future Development Trends Criterion Response
Has your jurisdiction annexed any land since
the preparation of the previous hazard
mitigation plan?
Yes
If yes, give the estimated area annexed and
estimated number of parcels or structures.

Local Agency Formation Commission 18-07,Ocean View School District:5.31 Acres, 1 Parcel
Local Agency Formation Commission 16-01, City of Oxnard Reorganization:

0.77 Acres, 1 Parcel
Is your jurisdiction expected to annex any
areas during the performance period of this
plan?
Yes
If yes, describe land areas and dominant
uses.

Teal Club Annexation—990 single and multifamily dwelling units, 132,000 square-feet of business park, 60,000 square-feet of commercial space, 17.76 acres of parks and open space. The project also includes annexation of 11.4 acres that is pre-zoned for light manufacturing uses.

Rio Urbana Annexation—The Rio Urbana annexation would allow the construction of a new mixed-use development that includes 182 condominium residential units and a 15,000-square-foot office building containing the Rio School District administrative offices.

If yes, who currently has permitting
authority over these areas?
The Countyof Ventura currently has permittingauthorityover the Teal Club area and the Rio Urbana project site.

Are any areas targeted for development or
major redevelopment in the next five years?
Yes
If yes, briefly describe, including whether
any of the areas are in known hazard risk
areas
Downtown adding up to 2800 units, The Village Specific Plan buildout, Northshore Development, Riverpark Specific Plan buildout, continued industrial development in Sakioka Farms Specific Plan. All areas are within city limits and all areas are in the liquefaction zone.

One annexation approval with 167 housing units is expected in 2021. One large specific plan annexation (Teal Club) with 990 units is under consideration. 674
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 6-4
Criterion Response
How many permits for new construction were
issued in your jurisdiction since the
preparation of the previous hazard mitigation
plan?
2016 2017 2018 2019 2020
Single Family 140 86 36 59 19
Multi-Family 26 27 18 34 42
Other (commercial, mixed use, etc.)17 12 10 7 7
Total 183 125 64 100 68
Provide the number of new-construction
permits for each hazard area or provide a
qualitative description of where development
has occurred.

Special Flood Hazard Areas: 0—Based on FEMA National Flood Hazard Layer (NFHL) downloaded June 9, 2021 Using zones A, A99 , AE, AH, AO, & VE as SFHA and excluding zones X & D
Landslide: 0—Based on Webservice of Seismic Hazard Zone Maps for Landslides produced by the Seismic Hazards Program, California Geological Survey, California Department of Conservation and downloaded from open data site on June 17, 2021 High Liquefaction Areas: 540—Based on information contained hereon was obtained from California Department of Conservation, Division of Mines and Geology via the County of Ventura GIS
Tsunami Inundation Area: 51—Based on information contained hereon was obtained from California Department of Conservation, Division of Mines and Geology via the County of Ventura GIS
Wildfire Risk Areas: 0
Describe the level of buildout in the
jurisdiction, based on your jurisdiction’s
buildable lands inventory. If no such
inventory exists, provide a qualitative
description.

Almost entire city (26 sq miles) is first or second generation construction. About 500 acres of farming remain within city limits in areas zoned for industrial or housing but not yet built. Planning capacity for about 8,000 units and 8 million sf industrial/commercial remains under the 2030 General Plan.

6.4 CAPABILITY ASSESSMENT
This section describes an assessment of existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning.

Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table in this annex identifies these as community capacity building mitigation actions. The findings of the assessment are presented as follows:

An assessment of planning and regulatory capabilities is presented in Table 6-3.

Development and permitting capabilities are presented in Table 6-4.

An assessment of fiscal capabilities is presented in Table 6-5.

An assessment of administrative and technical capabilities is presented in Table 6-6.

An assessment of education and outreach capabilities is presented in Table 6-7.

Information on National Flood Insurance Program (NFIP) compliance is presented in Table 6-8.

Classifications under various community mitigation programs are presented in Table 6-9.

The community’s adaptive capacity for the impacts of climate change is presented in Table 6-10.
675

6. City of Oxnard
6-5
Table 6-3.Planning and Regulatory Capability
Local
Authority
Other Jurisdiction
Authority
State
Mandated
Integration
Opportunity?
Codes, Ordinances, & Requirements
Building Code Yes No Yes No
Comment:2019 California Building Code as adopted by the City of Oxnard Ordinance No. 2968 Zoning Code Yes No Yes No
Comment:Chapter 16 (Inland Zoning Ordinance) and Chapter 17(Coastal Zoning Ordinance) of the Oxnard City Code (OCC) Pursuant to the California Coastal Act (Public Resources Code Division 20, Chapter 6, Article 1, 30500), the City shall prepare a Local Coastal Program for the portion of the coastal zone within its jurisdiction. The LCP is comprised of a Land Use Plan and a Local Implementation Plan which is the Coastal Zoning Ordinance.

Subdivisions Yes No Yes No
Comment:Chapter 15 of the OCC regulates and control the design and improvement of subdivisions of land within the city and supplement the provisions of the Subdivision Map Act of the State of California set forth at Government Code Section 66410 et seq. concerning the design, improvement and survey data of subdivisions, the form and content of all maps provided for by the Subdivision Map Act, and the procedure to be followed in securing the official approval of the City regarding the maps.

Stormwater Management Yes No No Yes
Comment:Chapter 22, Article 12 implements the Federal Water Pollution Control Act (the Clean Water Act), 33 U.S.C. Section 1251et seq., as amended, and Division 7 of the California Water Code by prohibiting the discharge of any pollutant to navigable waters of the United States from a point source unless the discharge is authorized by a permit issued pursuant to the Metropolitan required by Clean Water Act Section 402 (33 U.S.C. Section 1342), and by prohibiting non-storm water discharges into the storm drain system.

Post-Disaster Recovery Yes No Yes Yes
Comment:The City of Oxnard does not have a separate disaster recovery plan, guidance and direction for disaster recovery is provided in the Oxnard Emergency Operations Plan (EOP)
Real Estate Disclosure No Yes Yes Yes
Comment:California State Civil Code 1102 requires full disclosure on natural hazard exposure of the sale/re-sale of any and all real property. To be implemented by sellers and realtors. City of Oxnard Ordinance 2383 requires that at the time of entering into an agreement of sale or exchange of any building, the owner or authorized representative shall obtain from the city a report of the building record showing the regularly authorized use, occupancy and zoning classification of such property.

Growth Management Yes No Yes Yes
Comment:California state law requires that every county and city prepare and adopt a comprehensive long-range plan to serve as a guide for community development. The General Plan for the City of Oxnard was amended and adopted in July 2011. The General Plan contains 10 elements that address many aspects of the community including: land use, housing, parks and open space, community design, circulation, infrastructure, safety, sustainability and conservation of resources. The General Plan is the City’s overarching policy document. All City policies and ordinances must be consistent with the General Plan.

The Planning Division is responsible for maintaining the General Plan and preparing amendments to the document as directed by the City Council. The City is preparing a Climate Action and Adaptation Plan consistent with SB39.

Site Plan Review Yes No No No
Comment:Chapter 15 of the OCC regulates the form and contents, submittal and approval of tentative tract maps for the subdivision of five (5) or more parcels and tentative parcel maps for the subdivision of four (4) or fewer parcels shall be governed by the provisions of this chapter. Chapters 16 and 17 of the OCC identify allowed uses and provide development standards that regulate development within the City.
676
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 6-6
Local
Authority
Other Jurisdiction
Authority
State
Mandated
Integration
Opportunity?
Environmental Protection Yes No Yes Yes
Comment:The California Environmental Quality Act (CEQA) requires state and local agencies to identify the significant environmental impacts of their actions and to avoid or mitigate those impacts, if feasible. On June 28, 2017, the City Council adopted Resolution 15,040 approving an update to the California Environmental Quality Act (CEQA) Guidelines.

Chapter 22 ,Article 12 implements the Federal Water Pollution Control Act (the Clean Water Act), 33 U.S.C. Section 1251 et seq., as amended, and Division 7 of the California Water Code by prohibiting the discharge of any pollutant to navigable waters of the United States from a point source unless the discharge is authorized by a permit issued pursuant to the National Pollutant Discharge Elimination System required by the Clean Water Act Section 402 (33 U.S.C. Section 1342), and by prohibiting non-storm water discharges into the storm drain system.

Chapter 18, Article 4 recently updated in December 2020 with the authority conferred by Cal. Gov’t Code sections 65302, 65560 and 65800 to adopt regulations designed to promote the public health, safety, and general welfare.

Flood Damage Prevention Yes No Yes Yes
Comment:Chapter 18, Article 4 recently updated in December 2020 with the authority conferred by Cal. Gov’t Code sections 65302, 65560 and 65800 to adopt regulations designed to promote the public health, safety and general welfare.

Emergency Management Yes No Yes Yes
Comment:Oxnard Emergency Operations Plan—City Ordinance No. 2916 Climate Change Yes No Yes Yes
Comment:The City is currently preparing a Climate Action and Adaptation Plan which intends to be comprehensive, robust and innovative to help the City plan for future climate goals and develop vision for how sustainability should be implemented in the City. The Climate Action and Adaptation Plan is anticipated to culminate with adoption by the City Council in mid/late- 2022.

Planning Documents
General Plan Yes No Yes Yes
Is the plan compliant with Assembly Bill 2140?Yes
Comment:The City’s current 2030 General Plan contains Safety Element that includes goals and policies that address liquefaction and subsidence risk; coastline and beach preservation; emergency preparedness; and hazardous materials and uses.

Capital Improvement Plan Yes No Yes Yes
How often is the plan updated?Once a year
Comment:The City Council adopts a 5-year Capital Improvement Plan with the City Council making amendments on an annual basis.

Disaster Debris Management Plan Yes Yes Yes Yes
Comment:Ventura County Disaster Recovery Plan, Adopted by BOS in April 2019 Floodplain or Watershed Plan Yes No Yes No
Comment:Chapter 18, Article 4 recently updated in December 2020 with the authority conferred by Cal. Gov’t Code sections 65302, 65560 and 65800 to adopt regulations designed to promote the public health, safety and general welfare. The City participates in the National Flood Insurance Program (NFIP) Community Rating System (CRS)Class 7 Stormwater Plan Yes No Yes Yes
Comment:The City is developing the Public Works Integrated Master Plan to develop long-term recommendations for policies, programs, and projects that successfully address and respond to immediate drought conditions while also planning for long- term water needs, reducing dependence upon costly imported water, addressing aging infrastructure and reliability concerns, pursuing aggressive goals for energy efficiency and sustainable solutions, maintaining compliance with changing regulatory requirements, and the ongoing loss of seasoned staff and personnel. 677

6. City of Oxnard
6-7
Local
Authority
Other Jurisdiction
Authority
State
Mandated
Integration
Opportunity?
Urban Water Management Plan Yes No Yes Yes
Comment:The City has an adopted Urban Water Management Plan.The plan details long-term resource planning to ensure that adequate water supplies are available to meet existing and future water needs. In conjunction with the Urban Water Management Plan, a separate Water Shortage Contingency Plan, is also being prepared. The Water Shortage Contingency Plan outlines how an urban water supplier will respond to various stages of a drought or a prolonged shortage caused by other events.

Habitat Conservation Plan No No No No
Comment:Not applicable for the City of Oxnard
Economic Development Plan Yes No Yes No
Comment:The City’s 2030 General Plan contains an Economic Development Chapter within the Community Development Element.

The City created a draft strategic plan which was presented to the Housing and Economic Development Committee and the Chamber of Commerce in 2020 before the pandemic. However, given that COVID significantly impacted the business landscape, staff will be working on a new strategic plan to emphasize business retention, workforce development, and site- based development.

Shoreline Management Plan Yes No Yes No
Comment:The City of Oxnard is currently updating the City’s Local Coastal Program to address Sea Level Rise and coastal hazards.

Community Wildfire Protection Plan No No No No
Comment:Not applicable for the City of Oxnard
Forest Management Plan No Yes No Yes
Comment:Not applicable for the City of Oxnard
Climate Action Plan Yes No Yes Yes
Comment:The City is currently preparing a Climate Action and Adaptation Plan which intends to be comprehensive, robust and innovative to help the City plan for future climate goals and develop vision for how sustainability should be implemented in the City. The Climate Action and Adaptation Plan is anticipated to culminate with adoption by the City Council in mid 2022.

Emergency Operations Plan Yes No Yes Yes
Comment:Oxnard Emergency Operations Plan
Threat & Hazard Identification & Risk Assessment (THIRA)No Yes No Yes Comment:We are currently evaluating the need to complete a THIRA for the City of Oxnard.

Post-Disaster Recovery Plan Yes No Yes Yes
Comment:Disaster Recovery Operations are covered in the Oxnard Emergency Operations Plan Continuity of Operations Plan Yes No Yes Yes
Comment:Continuity of Government—Section within the Oxnard Emergency Operation Plan Public Health Plan No Yes Yes Yes
Comment:County of Ventura Health Care Agency Public Health Emergency Response Plan (ERP) Other—Countywide Tsunami Plan No Yes Yes Yes
Comment:The County of Ventura has an existing plan that describes each City’s role and has been adopted locally. A revision of this document is required within the coming year.

Table 6-4.Development and Permitting Capability
Criterion Response
Does your jurisdiction issue development permits? Yes
If no, who does? If yes, which department?Building and Safety Division of the Community Development Department Does your jurisdiction have the ability to track permits by hazard area?No The City does not currently track building permits
issued by hazard area.

Does your jurisdiction have a buildable lands inventory?No 678
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 6-8
Table 6-5.Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants Yes
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes No. Requires a vote of the people User Fees for Water, Sewer, Gas or Electric Service Yes If yes, specify:Water and Sewer
Incur Debt through General Obligation Bonds No. Requires a vote of the people Incur Debt through Special Tax Bonds Yes
Incur Debt through Private Activity Bonds Yes
Withhold Public Expenditures in Hazard-Prone Areas Yes
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers Yes Other Yes
If yes, specify:Federal-sponsored grant programs
Table 6-6.Administrative and Technical Capability
Staff/Personnel Resource Available?
Planners or engineers with knowledge of land development and land management practicesYes If Yes, Department /Position:Community Development, all Planners) Public Works—City Engineer; Supervising Civil Engineer
Engineers or professionals trained in building or infrastructure construction practices Yes If Yes, Department /Position:Public Works—City Engineer; Supervising Civil Engineer; Project Manager; Senior Civil Engineer; Construction Inspector; Project Coordinator; Engineering Tech Planners or engineers with an understanding of natural hazards Yes If Yes, Department /Position:Public Works—City Engineer Staff with training in benefit-cost analysis Yes
If Yes, Department /Position:Public Works—Transportation Planner and Grants Coordinator Surveyors Yes
If Yes, Department /Position:Public Works (Consultant)
Personnel skilled or trained in GIS applications Yes
If Yes, Department /Position:Information Technology—GIS Manager, GIS Technician III, GIS Systems Analyst, GIS Programmer Analyst
Scientist familiar with natural hazards in local area No If Yes, Department /Position:None
Emergency manager Yes
If Yes, Department /Position:Fire Department—City Emergency Services Manager Grant writers Yes
If Yes, Department /Position:Public Works—Grants Coordinator and Transportation Planner 679

6. City of Oxnard
6-9
Table 6-7.Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? Yes If yes, briefly describe:City website has disaster preparedness and fire prevention information in English and Spanish Do you use social media for hazard mitigation education and outreach? Yes If yes, briefly describe:We have in the past used social media to address specific hazard mitigation issues.

Do you have any citizen boards or commissions that address issues related to hazard mitigation?Yes If yes, briefly describe:Yes, the Fire Chief has an advisory “Team” that address emergency preparedness and hazard reduction issues. Organized “Neighborhood Councils” are also used to disseminate emergency preparedness and hazard mitigation information.

Do you have any other programs in place that could be used to communicate hazard-related information?Yes If yes, briefly describe:Community events such as: neighborhood fairs, emergency preparedness fairs, CERT training, neighborhood council meetings, homeowners’ association meetings are all used to disseminate emergency preparedness and hazard mitigation information.

Do you have any established warning systems for hazard events? Yes If yes, briefly describe:“Alert and Warning”procedures as described in the Oxnard Emergency Operations Plan and the VC Alert System
Table 6-8.National Flood Insurance Program Compliance
Criterion Response
What local department is responsible for floodplain management? Public Works Who is your floodplain administrator? (department/position) City Engineer Are any certified floodplain managers on staff in your jurisdiction? No What is the date that your flood damage prevention ordinance was last amended?December 2020 Does your floodplain management program meet or exceed minimum requirements?Meets If exceeds, in what ways?
When was the most recent Community Assistance Visit or Community Assistance Contact?2017 Community Assistance Visit Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed?
No
If so, state what they are.

Are any RiskMAP projects currently underway in your jurisdiction? Yes If so, state what they are.RiskMAP, Ventura County Levees Do your flood hazard maps adequately address the flood risk within your jurisdiction?Yes If no, state why.

Does your floodplain management staff need any assistance or training to support its floodplain management program?
Yes
If so, what type of assistance/training is needed?Admin training Does your jurisdiction participate in the Community Rating System (CRS)? Yes, Class 7 If yes, is your jurisdiction interested in improving its CRS Classification?No If no, is your jurisdiction interested in joining the CRS program?N/A How many flood insurance policies are in force in your jurisdiction?a 497 What is the insurance in force?$166,210,700
What is the premium in force?$323,235
How many total loss claims have been filed in your jurisdiction?a 71 What were the total payments for losses?$244,574
a. According to FEMA statistics as of March 31, 2021
680
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 6-10
Table 6-9.Community Classifications
Participating?Classification Date Classified
FIPS Code Yes 06-111-54652 N/A
DUNS # Yes 081790214 N/A
Community Rating System Yes 7 N/A
Building Code Effectiveness Grading ScheduleYes Residential:3 Commercial Industrial: 2
2015/2016
Public Protection Yes 02/2X December 1, 2017
Storm Ready Yes N/A July 2021
Firewise No N/A N/A
Tsunami Ready Yes N/A July 2021
Table 6-10.Adaptive Capacity for Climate Change
Criterion
Jurisdiction
Ratings
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Medium Comment: The City is preparing a Climate Action and Adaptation Plan (CAAP). Community engagement has highlighted interest in and knowledge of climate impacts.

Jurisdiction-level monitoring of climate change impacts Low Comment: The CAAP will establish programs and monitoring protocols.

Technical resources to assess proposed strategies for feasibility and externalities Low Comment: Documentation prepared for CAAP and SLR and vulnerability study Jurisdiction-level capacity for development of greenhouse gas emissions inventory High Comment: Through the CAAP this has occurred.

Capital planning and land use decisions informed by potential climate impacts Medium Comment: This will come out of the CAAP.

Participation in regional groups addressing climate risks High Comment: Professional planner and focused position
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Medium Comment: This will come out of CAAP implementation.

Identified strategies for greenhouse gas mitigation efforts High Comment: The CAAP includes this information including strategies Identified strategies for adaptation to impacts High
Comment: The CAAP includes this information including strategies Champions for climate action in local government departments High Comment: The CAAP includes this information including strategies Political support for implementing climate change adaptation strategies High Comment: Financial support for CAAP study.

Financial resources devoted to climate change adaptation Low Comment: The CAAP includes this information including strategies Local authority over sectors likely to be negative impacted Medium Comment: Addressed in CAAP engagement
681

6. City of Oxnard
6-11
Criterion
Jurisdiction
Ratings
Public Capacity
Local residents’ knowledge of and understanding of climate risk Medium Comment: Addressed in CAAP engagement
Local residents’ supportof adaptation efforts Medium
Comment: Addressed through CAAP engagement
Local residents’ capacity to adapt to climate impacts Low Comment: Input provided during sea level rise engagement and CAAP efforts Local economy current capacity to adapt to climate impacts Low Comment:

Local ecosystems capacity to adapt to climate impacts Low Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.

6.5 INTEGRATION REVIEW
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as general planning and capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future.

Resources listed at the end of this annex were used to provide information on integration. The progress reporting process described in Volume 1 of the hazard mitigation plan will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration.

6.5.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs:

Oxnard Emergency Operations Plan (EOP)—The Emergency Operations Plan addresses the City of Oxnard’s planned response to extraordinary emergency situations associated with natural disasters, technological incidents, and national security emergencies.

Ventura County Mass Care and Shelter Plan—This document is intended for use during the preparedness phase to help guide care and shelter planning. It provides all the planning information and guidelines that are relevant for government’s consideration before opening disaster shelters. This document is intended to help cities plan for shelter operations, while also providing an overview of the complete scope of care and shelter services.

Ventura County Operational Area Emergency Operations Plan—The County of Ventura Emergency Operations Plan (EOP) provides the structure and processes that all key partner agencies within the county use to respond to, and initially recover from, a major emergency or disaster event.

California Tsunami Evacuation Playbook (Ventura County, City of Oxnard)—This playbook is designed to help the emergency managers with tsunami evacuation and 682
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 6-12
response activities. The goal is to protect the residents within the local Tsunami Inundation Zone by providing guidance for early warning and coordinated evacuations. 2030 City of Oxnard General Plan—The General plan contains a Safety Element that includes goals and policies that address liquefaction and subsidence risk; coastline and beach preservation; emergency preparedness; and hazardous materials and uses.

6.5.2 Opportunities for Future Integration
The capability assessment in this annex indicates opportunities to integrate this mitigation plan with other jurisdictional planning/regulatory capabilities. Capabilities were identified as integration opportunities if they can support or enhance the actions identified in this plan or be supported or enhanced by components of this plan. The capability assessment identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future:
2030 City of Oxnard General Plan: The 2030 General Plan should be revised to address hazard mitigation plan elements as needed in the 2022 HMP program and consider integration opportunities by adopting relevant policies in future Safety Element. updates Local Coastal Program (LCP) Update:The City is in the process of a comprehensive LCP update. One of the goals of the City’s LCP update is to consider and address Sea Level Rise (SLR) and to ensure that policies to implement adaptation options occur in a way that protects the City’s coastal economic vitality, community character, public and private property, coastal resources and public safety.

Taking action to integrate each of these programs with the hazard mitigation plan was considered as a mitigation action to include in the action plan in this annex.

6.6 RISK ASSESSMENT

6.6.1 Jurisdiction-Specific Natural Hazard Event History Table 6-11 lists past occurrences of natural hazards for which specific damage was recorded in this jurisdiction Other hazard events that broadly affected the entire planning area, including this jurisdiction, are listed in the risk assessments in Volume 1 of this hazard mitigation plan.

6.6.2 Hazard Risk Ranking
Table 6-12 presents a local ranking of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property, and the economy. Mitigation actions primarily target hazards with high and medium rankings.
683

6. City of Oxnard
6-13
Table 6-11.Past Natural Hazard Events
Type of Event FEMA Disaster #Date Damage Assessment
Rain and High Wind Event January 19, 2021 Trees down, road closures, power outages, damage to structures
Pandemic Influenza COVID-194482-DR-CA January 20, 2020 Continuing Ongoing Atmospheric River Storm
System
CA Disaster 109 January/February 2019 Local stream and street flooding, trees down, power outages
Wildfires, Flooding, Mudflows,
and Debris Flows
DR-4353 December 4, 2017-January 31,
2018
Post Thomas Fire debris flows in local rivers,
large deposits of debris on local beaches,
road closures
Thomas Fire 4224-DR-CA December 4, 2017 Public Health issues due to smoke, power outages, sewage spill due to power outage
February Winter Storm CA Disaster 77.1February 2017 Local stream and street flooding, trees down, power outages, debris deposits in local
stream and on beaches
January Winter Storm CA Disaster 77 January 2017 Local stream and street flooding, trees down, power outages, debris deposits in local
stream and on beaches
Extreme Windstorm February 2016 Trees down, power outages, street closures, damage to structures, debris
Erratic Weather (frost, heat,
drought)
Winter 2013 Damage to crops, economic loss
Tsunami (7.1 earthquake in
Japan)
March 11, 2011 Damage to local harbors, marinas and docks Tsunami (8.8 Quake in Chile) February 27, 2010 Damage to local harbors, marinas and docks Storm and Flood January 18–22, 2010. Local stream and street flooding, trees down, power outages
Wildfires, Flooding, Mudflows,
and Debris Flows
DR-1731 October 21 – March 31, 2008 Post burn, flooding, debris and mud flows.

Severe Storm DR-1267 January 7–11, 2005 Flooding and debris flows “El Nino”Storm and Flood February 1998 Street and stream flooding, debris flows Storms and Floods January and March, 1995 Unknown
Northridge Earthquake DR-1008 January 17–November 30, 1994Power and communications disruptions, damage to structures
Storm and Flood February 10-15, 1992 Street and stream flooding, debris flows Earthquake (Whittier Narrows
Earthquake)
October 1, 1987 Unknown
Storm and Flood February 25-March 3, 1983 Street and stream flooding, debris flows Storm and Flood February 13-22, 1980 Street and stream flooding, debris flows Sespe Creek Flood March 4, 1978 Street and stream flooding, debris flows Storms and Floods (Calleguas
Creek Flood)
February 28-March 5, 1978 Street and stream flooding, debris flows St Francis Dam Disaster March 12, 1928 $7 Million (1928)—Inundation of nearly the entire city, flooding, debris flows, destruction
of infrastructure, high loss of life
684
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 6-14
Table 6-12.Hazard Risk Ranking
Rank Hazard Risk Ranking Score Risk Category
1 Dam Failure 36 High
2 Earthquake 32 Medium
3 Severe Storm 24 Medium
4 Severe Weather 24 Medium
5 Flooding 18 Medium
6 Landslide 18 Medium
7 Sea Level Rise 18 Medium
8 Tsunami 12 Low
9 Drought 9 Low
10 Wildfire 0 Low

6.6.3 Jurisdiction-Specific Vulnerabilities
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. This section provides information on a few key vulnerabilities for this jurisdiction. Available jurisdiction-specific risk maps of the hazards are provided at the end of this annex.

Repetitive Loss Properties
Repetitive loss records are as follows:

Number of FEMA-identified Repetitive-Loss Properties: 7 Number of FEMA-identified Severe-Repetitive-Loss Properties: N/A Number of Repetitive-Loss or Severe-Repetitive-Loss Properties that have been mitigated: N/A Other Noted Vulnerabilities
The following jurisdiction-specific issues have been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources:

Unreinforced Masonry and Soft Story Structures—Oxnard has numerous unreinforced masonry and soft story buildings within the city limits. These buildings are subject to severe damage or structural collapse during a moderate to severe earthquake.

Homeless Population—A significant number of persons commonly defined as “Homeless” live in the Santa Clara River and other undeveloped areas. During wildland fires, storms and flooding these individuals are at great risk.

Street and Urban Flooding—There are numerous areas of the city that flood to varying degrees during periods of high rain. The effects of this flooding range from street closures to damage to property, vehicles and buildings.

Power Outages/Emergency Power—Local power outages have resulted from high winds and storm conditions as well as from the effects of wildland fire in the region. Many key city buildings including the Main City Hall and Council Chambers buildings have no back-up power or emergency generators.
685

6. City of Oxnard
6-15
Debris Flows—Following heavy rains and winter storms, substantial debris flows have occurred in the Santa Clara River as well as other local streams and culverts. Debris flows following wildland fires are particularly bad and can require removal of material from streams, streets, culverts and beaches.

Liquefaction Potential—Nearly the entire City of Oxnard is located in a “Liquefaction Zone”.

The effects and damage caused by seismic activities can be amplified resulting in increased damage to buildings and infrastructure.

Tsunami Awareness and Notification—Oxnard has a large visitor and tourist population who may not be aware of the tsunami risk.

Sea Level Rise (SLR)—SLR is an identified flooding threat to the future of the City of Oxnard.

Therefore, planning for local adaptation and resiliency is an identified City Council priority and part of the Local Coastal Program update. It is a complex and difficult issue that will require strong coordination at the federal, State, and local level over the long term to effectively plan for and adapt to changing variables over time. Adaptation strategies are based upon various SLR projections anticipated to occur in years 2030, 2060, and 2100.

Drought—Much of California, Ventura County and the City of Oxnard has been experiencing a multiyear drought. Continued drought can directly impact land use, development options, as well as economic development in the city. This includes negatively impacting business development, including expansion and retention and support for agricultural resources and industries. More prolonged and severe drought conditions could potentially impact potable water supplies to the point of creating a public health and safety emergency.

For background: The City of Oxnard purchases 40-50% of its total water supply from Calleguas Municipal Water District. This water is State Water Project water supplied by Metropolitan Water District. In addition to State water, the City of Oxnard supplements its remaining water needs from groundwater that is pumped by the City (20-30%) and by the United Water Conservation District (20-30%). According to the 2021 Groundwater Sustainability Plan (GSP), the Oxnard Subbasin water has experienced drier than average conditions since 2015 and anticipates little change to the water elevation level due to the current drought. The subbasin is currently at a level categorized as being in overdraft per the GSP.

Mitigation actions addressing these issues were prioritized for consideration in the action plan in this annex.

6.7 STATUS OF PREVIOUS PLAN ACTIONS
The following table summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared. 686
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 6-16
Table 6-13.Status of Previous Plan Actions
Action Item Completed
Removed;
No Longer
Feasible
Carried Over to Plan
Update
Check if
Yes
Action # in
Update
OX 3—Increase participation in the NFIP by maintaining a CRS rating Class 9, which through enhanced floodplain management activities would allow property owners to receive a discount on their flood insurance.

Comment: Increased participation by upgrading CRS rating from Class 9 to Class 7. The City will continue to maintain CRS rating Class 7.

OX 4—Develop a tool to collect and analyze post-flood disaster risk assessment information to allow the City of Oxnard to analyze the effects of the flood and implement future mitigation projects. Information to be collected will include: number and location of structures, including RL properties, flooded; identification of flooded areas outside of the SFHA and floodwater heights at these locations; number and location of failed gages; etc.

OXN-19
Comment:Information is being collected as required by CRS program. The tool is to be developed once funding is available. Funding was requested in FY 21-22 for this purpose
OX 5—Continue to participate in the NWS TsunamiReady Program through continued implementation of Guideline 4: Community Preparedness measures, including public outreach material and curriculum.

OXN-10
Comment:Oxnard continues to participate in the TsunamiReady Program and will be updating and renewing its application again this year. This is an ongoing program.

OX 6—Evaluate Santa Clara Levees 1, 2 and 3 for upgrade and construction.

Comment:Evaluations have been completed by the County of Ventura. Levees are County-owned.

OX 7—Construct a Mandalay Beach storm drainage system to the Channel Islands Harbor. During rain events, stormwater accumulation along Mandalay Beach Road is caused by wind and sand blocking the drainage to the ocean outfall.

OXN-20
Comment:This is currently being mitigated with a dedicated portable pump that is deployed and turned on during storm events. Pump station construction is estimated at $30M+ and has not been completed due to lack of funding.

OX 8—Construct a permanent lift station for Ventura Road @ Wagon Wheel Road.

Water in the low point in the roadway must be manually pumped with each rain event.

Comment:The improvements are currently in the design phase. Wagon Wheel Development conditioned to construct.

OX 9—Construct a stormwater lift station at Perkins Road. Flooding occurs at the point in Perkins Road which is caused by an undersized sump pump. The proposed stormwater lift system will transport stormwater to the Advanced Water Purification Facility and recycle the storm water for agricultural use along Hueneme Road.

OXN-20
Comment:Currently being mitigated with a portable pump that is turned on during storm events. Pump station has not been completed due to lack of funding. The discharge location may change so discharge location is not included in the updated action plan.

OX 10—Construct a permanent flood protection pump station at Dodge Road.

Flooding occurs at the low point in Dodge Road at the intersection with Maulhardt Road.

OXN-20
Comment:Currently being mitigated with a portable pump that is turned on during storm events. Pump station has not been completed due to lack of funding.
687

6. City of Oxnard
6-17
Action Item Completed
Removed;
No Longer
Feasible
Carried Over to Plan
Update
Check if
Yes
Action # in
Update
OX 11—As part of the Memorandum of Agreement / Memorandum of Understanding with The Nature Conservancy (TNC): continue to partner with TNC on acquisition, restoration and mitigation planning processes; partner on grant proposals; participate in negotiations with land use owners; carry-out restoration projects; hold titles to floodplain properties as appropriate; and hold or co-hold with TNC multipurpose easements.

OXN-21
Comment:In 2016, the California State Coastal Conservancy, City of Oxnard, and The Nature Conservancy (collectively known as the Ormond Beach Partners) entered into a Memorandum of Understanding to actively coordinate and collaborate across the Ormond Beach Partners’ respective properties that total over 630 acres in order to protect, manage, and restore the Ormond Beach Area. The Project Partners are leading the Ormond Beach Restoration and Public Access Plan (OBRAP), with the goals of restoring the natural ecosystem and habitats and improving public access and enjoyment of Ormond Beach while protecting nature. The Ormond Beach Partners have held two public outreach meetings soliciting public input on the OBRAP in 2017 and 2019. The Ormond Beach Partners will conduct a public outreach meeting in 2021 to highlight the Preferred Alternative and Preliminary Design. The next phases of the OBRAP will be the environmental review, gap assessment, final design, permitting, funding and construction.

6.8 HAZARD MITIGATION ACTION PLAN
Table 6-14 lists the identified actions, which make up the hazard mitigation action plan for this jurisdiction. Table 6-15 identifies the priority for each action. Table 6-16 summarizes the mitigation actions by hazard of concern and mitigation type.

Table 6-14.Hazard Mitigation Action Plan Matrix
Benefits New or
Existing AssetsObjectives MetLead AgencySupport Agency
Estimated
Cost Sources of FundingTimeline
Action OXN-1—Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.

Hazards Mitigated:Dam Failure, Earthquake, Flooding, Landslide, Sea Level Rise, Tsunami Existing 2, 6, 9, 10, 11 Public Works. Community
Development
High HMGP, PDM, FMAShort-term
Action OXN-2—Amend General Plan Safety and Hazard Element text and as needed hazard maps, to reflect updated mapping of hazard areas identified by this Hazard Mitigation Plan, FEMA, Cal Fire, or the CA Seismic Hazard Mapping Program, in addition to background data associated with Local Coastal Plan update and background work associated with the City’s Climate Action and Adaptation Plan (CAAP)
Hazards Mitigated:Dam Failure, Drought, Earthquake, Flooding, Sea Level Rise, Severe Weather, Tsunami, Wildfire New & Existing1, 2, 3, 4, 5, 7, 8, 9,
10, 11, 12, 13, 14, 15,
17, 19
Community
Development
Public Works $500,000 Staff Time, General Fund,
Grant Funding, FEMA
HMA, BRICK, Pre and
Post Disaster Mitigation
Grant Funding
Short-term
Action OXN-3—Actively participate in the plan maintenance protocols outlined in Volume 1 of this Hazard Mitigation Plan.

Hazards Mitigated:Dam Failure, Drought, Earthquake, Flooding, Sea Level Rise, Severe Weather, Tsunami, Wildfire New & Existing 1, 2, 4, 6, 7, 8,9, 11,
12, 13, 14, 15
Public Works Community
Development
Low Staff Time, General Funds Short-term
688
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 6-18
Benefits New or
Existing AssetsObjectives MetLead AgencySupport Agency
Estimated
Cost Sources of FundingTimeline
Action OXN-4—Continue to maintain good standing and compliance under the National Flood Insurance Program (NFIP) through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements:

Enforce the flood damage prevention ordinance.

Participate in floodplain identification and mapping updates.

Provide public assistance/information on floodplain requirements and impacts.

Hazards Mitigated:Dam Failure, Severe Storm, Severe Weather, Flooding New & Existing 1, 2, 6, 7, 17 Public Works Community
Development
Low Staff Time, General FundsShort term
and
ongoing
Action OXN-5—Develop, approve, and implement the City’s Climate Action and Adaptation Plan (CAAP); including adaptive strategies to address hazards.

Hazards Mitigated:Sea Level Rise, Flooding, Wildfire, Severe Storms, Severe Weather, Drought New & Existing1, 2, 3, 4, 5, 6, 7, 8, 9,
10, 11, 12, 13, 14, 15,
16, 19
Community
Development
Public Works High Staff Time, General FundsShort-term
and on
going
Action OXN-6—Purchase generators for critical facilities and infrastructure that lack adequate backup power, & as recommended by the City’s CAAP .

Hazards Mitigated:Dam Failure, Earthquake, Flooding, Landslide, Severe Weather, Tsunami, Wildfire New & Existing 2, 19 Public Works Community
Development
Estimated:
$500,000 per
generator
(avg.)
Staff Time, General
Funds, Enterprise Funds,

HMGP, PDM
Short-term
Action OXN-7—Retrofit existing Seawalls at Mandalay Bay in order to withstand seismic events per the latest provisions in the California Building Code (CBC, 2019)
Hazards Mitigated:Earthquake
Existing 2, 4, 6, 9, 11, 19Public Works Community
Development
Estimated:
$200,000,000
Staff Time, General
Funds, HMGP, PDM,
FMA
Short-term
Action OXN-8—Replace existing 45-inch diameter water transmission main that is critical as a lifeline for residents, industry, and national defense, including the region’s military base. This project will prevent seismic-related failure of the transmission line of State Water Project water that provides potable water to a population of approximately 245,000. This pipeline supplies 60% of the City of Oxnard’s water and 50% of the City of Port Hueneme’s water which is then purveyed to Naval Base Ventura County’s Point Mugu and Port Hueneme installations.

Hazards Mitigated:Earthquake
Existing 2, 4, 6, 9, 11, 19City of OxnardCity of Port HuenemeEstimated:
$50,000,000
Staff Time, Enterprise
Funds, HMGP, PDM,
FMA
Short-term
Action OXN-9—Develop a comprehensive Sea Level Rise (SLR) Adaptation Plan to be implemented in the four identified coastal planning areas located within the City’s coastal zone to adopt long term adaptation policies and strategies to identify, manage, and reduce SLR impacts on coastal resources, private property and critical City facilities. The SLR adaptation policies and strategies included in the Local Coastal Program update would also be coordinated with the Climate Action and Adaptation Plan to address SLR vulnerabilities.

HazardsMitigated:Sea Level Rise
New & ExistingEnter Response
1, 2, 4, 5, 6, 8, 9, 10,
11, 12, 13, 14, 15, 16,
17, 18, 19
Public Works Community
Development;
County of Ventura and
Harbor Department;
City of Port Hueneme;
U.S. Department of
Defense (Navy)
High Grant
State
Federal
Long Term
689

6. City of Oxnard
6-19
Benefits New or
Existing AssetsObjectives MetLead AgencySupport Agency
Estimated
Cost Sources of FundingTimeline
Action OXN-10—Continue to participate in the NWS TsunamiReady Program through continued implementation of Guidelines for Community Preparedness measures, including public outreach material and curriculum. In 2021 Oxnard updated its application and has received approval from the NWS as a TsunamiReady Community. This is an ongoing program Hazards Mitigated:Tsunami
New & Existing1, 2, 6, 7, 8, 12, 17,
18, 19
Emergency
Services
Manager
Oxnard Fire and Public
Works Departments
Low Staff Time, Enterprise
Funds, EMPG, DHS
Ongoing
Action OXN-11—Construction of Aquifer Storage and Recovery (ASR) wells in order to ensure future reliable and affordable supply of high-quality water for the Oxnard Plain.

Hazards Mitigated:Drought
Existing 2, 4, 6, 9, 11, 19 City of Oxnard State Division of Drinking Water
High Staff Time, Enterprise
Funds, HMGP, PDM,
FMA
Short-term
Action OXN-12—Develop and implement a resident and visitor tsunami awareness and safety public education and outreach program.

Provide tsunami awareness, hazard, safety, and evacuation information at visitor locations including hotels, vacation rentals, campgrounds and day use recreational areas. Program would include signs, posters, handouts and public presentations.

Hazards Mitigated:Tsunami
New 1, 2, 7, 8, 10, 12, 17,
18, 19
Oxnard Police
and Fire
Departments
Oxnard Community
Development
Low Staff Time, Enterprise
Funds, EMPG, DHS
Short-term
Action OXN-13—Engage in a study to determine the best methods and strategies to communicate hazards and warnings to the city’s homeless population, particularly those living in undeveloped areas such as fields, creeks and riverbeds. Warnings would include notification of impending or immediate dangers.

Hazards Mitigated:Dam Failure, Earthquake, Flooding, Landslide, Severe Weather, Tsunami, Wildfire New 1, 2, 7, 8, 10, 12, 17,
18, 19
City of Oxnard High Grant Funding-FEMA

HMA (BRIC, FMA,
HMGP), Staff Time,
Enterprise Funds
Short-Term
Action OXN-14—Engage in a feasibility study to determine if Oxnard Fire Station 6 can be retrofitted, replaced or relocated due to seismic and tsunami hazards.

Hazards Mitigated:Earthquake, Tsunami
Existing 1, 2, 6, 7, 8, 9, 18, 19Oxnard Fire
Department
City Planning
Department
High Grant Funding-FEMA
HMA (BRIC, HMGP), Staff
Time, Enterprise Funds
Short-Term
Action OXN-15—Engage in a feasibility study to determine if Oxnard Fire Stations 2, 3, 4 & 5 can be retrofitted, replaced or relocated due to seismic hazards.

Hazards Mitigated:Earthquake
Existing 1, 2, 6, 7, 8, 9, 18, 19Oxnard Fire
Department
City Planning
Department
High Grant Funding-FEMA
HMA (BRIC, HMGP), Staff
Time, Enterprise Funds
Short-Term
Action OXN-16—Implement the findings of the feasibility studies with retrofits to, relocation of, or replacement of existing City Fire Stations including, Stations # 2, 3, 4, 5, 6. These stations were built between 1954 and 1978 prior to current building standards. Damage to these stations could seriously impact fire, rescue and EMS service within the City.

Hazards Mitigated:Earthquake, Tsunami
Existing 1, 2, 6, 7, 8, 9, 18, 19Oxnard Fire
Department
City Planning
Department
High Grant Funding-FEMA
HMA (BRIC, HMGP), Staff
Time, Enterprise Funds
Short-Term
690
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 6-20
Benefits New or
Existing AssetsObjectives MetLead AgencySupport Agency
Estimated
Cost Sources of FundingTimeline
Action OXN-17—Engage in a feasibility study to determine if the Oxnard Police Headquarters building, including the Dispatch facilility, can be retrofitted or should be replaced due to seismic hazards.

Hazards Mitigated:Earthquake
New 1, 2, 7, 8, 10, 12, 17,
18, 19
City of Oxnard Oxnard Police
Department
High Grant Funding-FEMA
HMA (BRIC,HMGP), Staff
Time, Enterprise Funds
Short-Term
Action OXN-18—Implement the findings of the feasibility study by retrofitting or replacing Oxnard Police Headquarters building. This will include expansion of the Dispatch facility to accommodate equipment for the radio and data traffic needed to support disaster response communications.

Hazards Mitigated:Earthquake, Tsunami, Severe Storms, Dam Failure, Wildfires, Flooding Existing 1, 2, 6, 7, 8, 9, 18, 19Oxnard Police
Department
Oxnard Fire
Department
High Grant Funding-FEMA
HMA (BRIC, HMGP), Staff
Time, Enterprise Funds
Short-Term
Action OXN-19—Develop a tool to collect and analyze post-flood disaster risk assessment information to allow the City of Oxnard to analyze the effects of the flood and implement future mitigation projects. Information to be collected will include: number and location of structures, including RL properties, flooded; identification of flooded areas outside of the SFHA and floodwater heights at these locations; number and location of failed gages; etc.

Hazards Mitigated:Flooding
New & Existing 1, 2, 17 City of Oxnard High Grant Funding-FEMA

HMA (BRIC, FMA,
HMGP), Staff Time,
Enterprise Funds
Short-Term
Action OXN-20—Construct pump stations forroadway areas affected by chronic flooding including, but not limited to:

Mandalay Beach storm drainage system to the Channel Islands Harbor. During rain events, stormwater accumulation along Mandalay Beach Road is caused by wind and sand blocking the drainage to the ocean outfall.

Construct a stormwater lift station at Perkins Road. Flooding occurs at the point in Perkins Road which is caused by an undersized sump pump.

Construct a permanent flood protection pump station at Dodge Road. Flooding occurs at the low point in Dodge Road at the intersection with Maulhardt Road.

Hazards Mitigated:Flooding, Severe Storms
Existing 2, 6, 10, 11 Public Works High Grant Funding-FEMA

HMA (BRIC, FMA,
HMGP), Staff Time,
Enterprise Funds
Short-Term
691

6. City of Oxnard
6-21
Benefits New or
Existing AssetsObjectives MetLead AgencySupport Agency
Estimated
Cost Sources of FundingTimeline
Action OXN-21—As part of the Memorandum of Agreement / Memorandum of Understanding with The Nature Conservancy (TNC):

Continue to partner with TNC on acquisition, restoration and mitigation planning processes Partner on grant proposals
Participate in negotiations with land use owners
Carry-out restoration projects
Hold titles to floodplain properties as appropriate
Hold or co-hold with TNC multipurpose easements.

Secure a Consolidated Coastal Development Permit to cover conservation and preservation activities over the next five years (2021-2026) that consist of the following:

Nesting shorebird protection activities
Invasive plant removal activities
Access road and trail maintenance activities
Field data collection and research.

Collaborate with Ventura County Public Works Agency-Watershed Protection, TNC, and State Coastal Conservancy to advance planning, design, and implementation of the Ormond Beach Restoration and Access Plan (OBRAP), particularly those components alleviating flooding along the Ormond Lagoon Waterway and creating public access along tšumaš Creek. This supports the VCPWA-WP Action VCPWA-13.

Hazards Mitigated:Drought, Flood, Severe Weather, Severe Storms, Sea Level Rise, Tsunami Existing and New1, 2, 3, 9, 12, 13, 14,
15, 17, 18, 19
City of Oxnard VCPWA-WP Medium Staff Time, Enterprise
Funds, FEMA Grants
(BRIC),
CDFG
Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date
Acronyms used here are defined at the beginning of this volume.

Table 6-15.Mitigation Action Priority
Action #
# of
Objectives
Met BenefitsCosts
Do Benefits
Equal or
Exceed Cost?
Is Project
Grant-
Eligible?
Can Project Be Funded
Under Existing
Programs/ Budgets?
Implementation
Priority
Grant
Pursuit
Priority
OXN 1 5 High High Yes Yes No Medium High
OXN 2 16 Medium Low Yes No Yes High Low
OXN 3 12 Low Low Yes No Yes High Low
OXN 4 5 Medium Low Yes No Yes High Low
OXN 5 17 Medium Low Yes No Yes High Medium
OXN 6 2 High Medium Yes Yes No Medium High
OXN 7 6 High High Yes Yes No High High
OXN 8 6 High High Yes Yes No High High
OXN 9 17 Medium High No Yes No Low Medium
OXN 10 9 High Low Yes Yes Yes High Low
OXN 11 6 High High Yes Yes No High High
OXN 12 9 High Low Yes Yes No High High
OXN 13 9 Low Medium Yes Yes No Medium High
OXN 14 8 MediumMedium Yes Yes No Medium High
OXN 15 8 MediumMedium Yes Yes No Medium High
692
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 6-22
Action #
# of
Objectives
Met BenefitsCosts
Do Benefits
Equal or
Exceed Cost?
Is Project
Grant-
Eligible?
Can Project Be Funded
Under Existing
Programs/ Budgets?
Implementation
Priority
Grant
Pursuit
Priority
OXN 16 8 High High Yes Yes No Medium High
OXN 17 9 Medium Medium Yes Yes No Medium High
OXN 18 8 High High Yes Yes No Medium High
OXN 19 3 Medium High No Yes No Medium Medium
OXN 20 4 High High Yes Yes No Medium High
OXN 21 11 MediumMedium Yes Yes Yes High Medium
a. See the introduction to this volume for an explanation of priorities.

Table 6-16.Analysis of Mitigation Actions
Hazard Type
Action Addressing Hazard, by Mitigation Typesa
Prevention
Property
Protection
Public
Education &
Awareness
Natural
Resource
Protection
Emergency
Services
Structural
Projects
Climate
Resilience
Community
Capacity
Building
High-Risk Hazards
Dam Failure OXN-1, 2, 3,
4, 6
OXN-1, 2, 3,
4, 6, 18
OXN-2, 3, 4,
13 OXN-1, 2, 3,
4, 6
OXN-2, 3, 4,
6, 13, 18
OXN-1, 2, 3,
4, 6, 18
OXN-1, 2, 3,
4, 6
OXN-4, 13,
18 Medium-Risk Hazards
Earthquake OXN-2, 3, 6,
8, 14, 15, 16
OXN-2, 3, 6,
8, 14, 15,
16, 17, 18
OXN-2, 3, 8,
13 OXN-2, 3, 6OXN-2, 3, 6,
8, 16, 17, 18
OXN-3, 6,
14, 15, 16,
17, 18
OXN-2, 6 OXN-8, 13,
14, 15, 16,
17, 18
Severe Storm OXN-1, 2, 3,
4, 20, 21
OXN-1, 2, 3,
4, 5, 18, 20
OXN-2, 3, 4,
5, 21
OXN-1, 2, 3,
4, 5, 20, 21
OXN-1, 2, 3,
4, 5, 18, 20
OXN-1, 2, 3,
18, 20
OXN-1, 2, 4,
5, 20, 21
OXN-4, 5,
18, 21
Severe Weather OXN-1, 2, 3,
4, 5, 6, 21
OXN-1, 2, 3,
4, 5, 6
OXN-3, 4, 5,
6, 21
OXN-1, 2, 3,
4, 5, 6, 21
OXN-1, 2, 3,
4, 6
OXN-1, 3, 5OXN-1, 2, 3,
4, 5, 6, 21
OXN-4, 5, 6,
21 Flooding OXN-1, 2, 3,
4, 5, 6, 7,
20, 21
OXN-1, 2, 3,
4, 5, 6, 7,
18, 20, 21
OXN-2, 3, 4,
5, 6, 7, 13, 19
OXN-1, 2, 3,
4, 5, 6, 7, 20,
21 OXN-1, 2, 3,
4, 5, 6, 18,
20 OXN-1, 2, 3,
4, 7, 18, 20
OXN-1, 2, 3,
4, 5, 6, 20,
21 OXN-4, 5, 6,
7, 13, 15, 18,
19, 21
Sea Level Rise OXN-1, 2, 5,
9, 21
OXN-1, 2, 3,
5, 9, 21
OXN-1, 2, 3,
5, 9
OXN-1, 2, 3,
5, 9, 21
OXN-2, 3 OXN-1, 2, 3,
5, 9
OXN-1, 2, 3,
5, 9, 21
OXN-1, 2, 3,
5, 9, 21
Low-Risk Hazards
Drought OXN-5, 11,
21 OXN-21 OXN-2, 5 OXN-2, 5,
11, 21
OXN-5 OXN-2, 3, 5,
11, 21
OXN-2, 3, 5,
11, 21
Wildfire OXN-1, 2, 3,
6 OXN-1, 2, 3,
6 OXN-2, 3, 5,
6, 20
OXN-2, 3, 5,
6 OXN-2, 5, 6,
13 OXN-2, 3, 5,
6 OXN-2, 3, 5,
6, 13
Tsunami OXN-1, 2, 3,
6, 10, 14,
16, 21
OXN-1, 2, 3,
6, 10, 14,
16, 18, 21
OXN-1, 2, 3,
6, 10, 12, 13
OXN-1, 2, 3,
6, 10, 21
OXN-1, 2, 3,
6 10, 13, 14,
16, 18
OXN-1, 2, 3
10, 14, 16,
18 OXN-1, 2, 3,
6, 10, 21
OXN-1, 2, 3,
6, 10, 13, 14,
16, 18, 21
a. See the introduction to this volume for an explanation of mitigation types.

6.9 PUBLIC OUTREACH
Table 6-17 lists public outreach activities for this jurisdiction. 693

6. City of Oxnard
6-23
Table 6-17.Local Public Outreach
Local Outreach Activity Date
Number of People
Involved
Virtual Emergency Preparedness Worship September 16, 2021 70 Adaptation Plan, outreach
Sea Level Rise Vulnerability Assessment Report Results and Adaptation Strategies Workshop
August 9, 2017 Approximately 25
Sea Level Rise Adaptation Strategy Results & Conceptual PoliciesMarch 14, 2018 Approximately 25

6.10 INFORMATION SOURCES USED FOR THIS ANNEX
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex.

City of Oxnard Municipal Code—The municipal code was reviewed for the full capability assessment and for identifying opportunities for action plan integration.

City of Oxnard Flood Damage Prevention Ordinance—The flood damage prevention ordinance was reviewed for compliance with the National Flood Insurance Program.

City of Oxnard 2021-2026 Five Year Capital Improvement Program (CIP)—The CIP was reviewed for identifying opportunities for action plan integration.

Flood Info Community Rating System Website (Ventura County):
https://www.vcfloodinfo.com/programs/flooding-and-flood-risk/vc-flood-history City of Oxnard Sea Level Rise Atlas:As required by the adopted California Coastal Commission Sea Level Rise Guidance Policy, a risk and vulnerability assessment using the best-available information and science regarding coastal erosion, flooding, wave impacts, tidal inundation and tsunamis is needed to identify potential physical impacts in the City’s coastal zone. In this way, the City can determine what areas are vulnerable to impacts from these five coastal hazards individually and combined, and with projected sea level rise. https://www.oxnard.org/wp-content/uploads/2021/06/OXNARD-FINAL-LCP-Sea-Level-Rise- Map-Atlas-Task-2.pdf
Sea Level Rise Vulnerability Assessment and Fiscal Impact Report:This study included a cost-benefit analysis of the adaptation strategies to allow comparison. The aim of the economic analysis was to provide a common metric against which the trade-offs between the costs and benefits of each adaptation strategy may be evaluated. The analysis accounts for the physical changes, economic benefits, and damages associated with each adaptation strategy, including th
City of Oxnard Emergency Operations Plan (EOP)—The EOP was used to obtain the listing of official natural hazards that can impact the City, reference materials such as tsunami and dam inundation maps as well emergency management priorities, and public alert and warning procedures.

The following outside resources and references were reviewed:

Hazard Mitigation Plan Annex Development Toolkit—The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan.
694
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 6-24

6.11 FUTURE NEEDS TO BETTER UNDERSTAND RISK/VULNERABILITY The City of Oxnard Fire Department is currently developing a Strategic Plan composed of numerous elements including a community risk analysis, infrastructure assessment, and community planning prioritization process. These elements are being created with significant input from key stakeholders including Fire Department personnel, City departments, external agencies, and the residential and business communities. It is anticipated that the Department’s Strategic Plan, anticipated for release in 2022, will strengthen the City’s understanding of risk and vulnerabilities and serve as a foundation for additional hazard mitigation project development during the next planning cycle. 695
Oxnard
Port Hueneme
Camarillo
San
Buenaventura
126
118
126
232
1 34
101
101 Food, Water, Shelter
Health and Medical
Safety and Security
Major Roads
Selected City
Incorporated Cities
County Boundary
Data Sources: Ventura Co., VCFD,
Casitas MWD, Calleguas MWD,
City of Camarillo, CA Energy
Commission, Cal Trans, EPA,
HIFLD, Esri
Oxnard
Critical Facilities (1 of 2)
0 1 20.5 Miles
696
Oxnard
Port Hueneme
Camarillo
San
Buenaventura
126
118
126
232
1 34
101
101
Communications
Energy
Hazardous Material
Transportation
Major Roads
Selected City
Incorporated Cities
County Boundary
Data Sources: Ventura Co., VCFD,
Casitas MWD, Calleguas MWD,
City of Camarillo, CA Energy
Commission, Cal Trans, EPA,
HIFLD, Esri
Oxnard
Critical Facilities (1 of 2)
0 1 20.5 Miles
697
Oxnard
Port Hueneme
Camarillo
San
Buenaventura
126
118
126
232
1 34
101
101
Data Sources: Ventura Co.,
CA DWR, Esri
Oxnard
Dam Failure
Inundation Areas
0 1 20.5 Miles
Combined Inundation
Areas
Major Roads
Selected City
Incorporated Cities
County Boundary
698
Oxnard
Port Hueneme
Camarillo
San
Buenaventura
126
118
126
232
1 34
101
101
Data Sources: Ventura Co.,
CGS, Esri
Oxnard
NEHRP Soil Class
0 1 20.5 Miles
C (Dense soil/soft rock)
D (Stiff soil)
E (Soft clay)
Major Roads
Selected City
Incorporated Cities
County Boundary
699
Oxnard
Port Hueneme
Camarillo
San
Buenaventura
126
118
126
232
1 34
101
101
Data Sources: Ventura Co.,
Esri
Oxnard
Liquefaction Susceptibility
0 1 20.5 Miles
Liquefaction zone
Major Roads
Selected City
Incorporated Cities
County Boundary
700
Oxnard
Port Hueneme
Camarillo
San
Buenaventura
126
118
126
232
1 34
101
101
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Oxnard
100-Year Probabilistic
Earthquake Scenario
0 1 20.5 Miles
Mercalli Intensity Scale
VII (Very Strong/Moderate)
Major Roads
Selected City
Incorporated Cities
County Boundary
701
Oxnard
Port Hueneme
Camarillo
San
Buenaventura
126
118
126
232
1 34
101
101
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Oxnard
Oak Ridge M7.16
Earthquake Scenario
0 1 20.5 Miles
Mercalli Intensity Scale
VII (Very Strong/Moderate)
VIII (Severe/Moderate-Heavy)
Major Roads
Selected City
Incorporated Cities
County Boundary
702
Oxnard
Port Hueneme
Camarillo
San
Buenaventura
126
118
126
232
1 34
101
101
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Oxnard
Pitas Point M7.12
Earthquake Scenario
0 1 20.5 Miles
Mercalli Intensity Scale
VI (Strong/Light)
VII (Very Strong/Moderate)
VIII (Severe/Moderate-Heavy)
Major Roads
Selected City
Incorporated Cities
County Boundary
703
Oxnard
Port Hueneme
Camarillo
San
Buenaventura
126
118
126
232
1 34
101
101
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Oxnard
San Cayetano M7.16
Earthquake Scenario
0 1 20.5 Miles
Mercalli Intensity Scale
V (Moderate/Very Light)
VI (Strong/Light)
VII (Very Strong/Moderate)
Major Roads
Selected City
Incorporated Cities
County Boundary
704
Oxnard
Port Hueneme
Camarillo
San
Buenaventura
126
118
126
232
1 34
101
101
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Oxnard
S. San Andreas M8.03
Earthquake Scenario
0 1 20.5 Miles
Mercalli Intensity Scale
V (Moderate/Very Light)
VI (Strong/Light)
Major Roads
Selected City
Incorporated Cities
County Boundary
705
Oxnard
Port Hueneme
Camarillo
San
Buenaventura
126
118
126
232
1 34
101
101
Data Sources: Ventura Co.,
FEMA, Esri
Oxnard
FEMA Flood Hazard Areas
0 1 20.5 Miles
1% Annual Chance
Flood (100-Year)

0.2% Annual Chance
Flood (500-Year)
Major Roads
Selected City
Incorporated Cities
County Boundary
706
Oxnard
Port Hueneme
Camarillo
San
Buenaventura
126
118
126
232
1 34
101
101
Data Sources: Ventura Co.,
CGS, Esri
Oxnard
Susceptibility to
Deep-Seated Landslides
0 1 20.5 Miles
Low
Moderate
High
Very High
Major Roads
Selected City
Incorporated Cities
County Boundary
707
Oxnard
Port Hueneme
Camarillo
San
Buenaventura
126
118
126
232
1 34
101
101
Data Sources: Ventura Co.,
OCOF, Esri
Oxnard
Sea Level Rise
of 25 cm (9.8 in.)
0 1 20.5 Miles
Sea Level Rise
Inundation Area
Major Roads
Selected City
Incorporated Cities
County Boundary
708
Oxnard
Port Hueneme
Camarillo
San
Buenaventura
126
118
126
232
1 34
101
101
Data Sources: Ventura Co.,
OCOF, Esri
Oxnard
Sea Level Rise
of 100 cm (39.4 in.)
0 1 20.5 Miles
Sea Level Rise
Inundation Area
Major Roads
Selected City
Incorporated Cities
County Boundary
709
Oxnard
Port Hueneme
Camarillo
San
Buenaventura
126
118
126
232
1 34
101
101
Data Sources: Ventura Co.,
CGS, Esri
Oxnard
Tsunami Inudation Zones
0 1 20.5 Miles
Inundation Zones
Major Roads
Selected City
Incorporated Cities
County Boundary
710
711
7-1

7. CITY OF PORT HUENEME

7.1 LOCAL HAZARD MITIGATION PLANNING TEAM
Primary Point of Contact Alternate Point of Contact
Brad Conners, City Manager
250 N. Ventura Road
Port Hueneme, CA 93041
Telephone: 805-986-6501
e-mail Address: [email protected]
Charles Peretz, Deputy City Manager
250 N. Ventura Road
Port Hueneme, CA 93041
Telephone: 805-986-6501
e-mail Address: [email protected]
hueneme.ca.us
This annex was developed by the local hazard mitigation planning team, whose members are listed in Table 7-1.

Table 7-1.Local Mitigation Planning Team Members
Name Title
Don Villafana Public Works Director
Lupe Acero Deputy Finance Director
Andrew Salinas Chief of Police
Tony Stewart Director of Community Development
Scott Matalon Emergency Preparedness Manager
Brad Conners City Manager
Charles Peretz Deputy City Manager

7.2 JURISDICTION PROFILE

7.2.1 Location and Features
Port Hueneme is a small coastal town located in Ventura County, just south of the City of Oxnard and east of Channel Islands Harbor. The City is home to Naval Base Ventura County (NBVC) and the Port of Hueneme and about five miles to the south is Naval Air Station Point Mugu. Port Hueneme is primarily built out and has a total land area of 4.5 square miles with a population of 23,647 people.

Regional access to the City is provided by Highway 101 and State Route 1. The City also includes beach front properties, parks, and public beaches visited from residents and non-residents alike. 712
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 7-2

7.2.2 History
The City of Port Hueneme was incorporated on March 24, 1948. The City of Port Hueneme (pronounced “Why-nee-mee”) is a unique community along Ventura County’s Gold Coast just south of the City of Oxnard and Channel Islands Harbor. Port Hueneme is unique because of its rich history, culture, and traditions, dating back to the Chumash Indians who made their home here for centuries and because of its long-established, close relationship with the U.S. Navy’s Port Hueneme and Point Mugu naval facilities.

7.2.3 Governing Body Format
The City of Port Hueneme is governed by a five-member city council. The City consists of six departments: Finance, Housing and Facilities, Community Development, Public Works, Police, and the City Manager’s Office. The City has 2 commissions which report to the City Council. The City currently employs a total of 170 employees (full-time equivalent).

The City Council assumes responsibility for the adoption of this plan; the City Manager will oversee its implementation.

7.3 CURRENT TRENDS

7.3.1 Population
According to the California Department of Finance, the population of the City of Port Hueneme as of January 2020 was 23,607. Since 2010, the population has grown at an average annual rate of 0.85 percent.

7.3.2 Development
Anticipated future development for Port Hueneme includes creating and sustaining a strong, viable economic base for the City. The City encourages development of diversified housing types that will meet our community’s needs. This includes establishing a mix of housing types in local neighborhoods to avoid economic stratification and enhance community diversity. Future growth in the City will be managed as identified in the City’s 2045 general plan. City actions, such as those relating to land use, annexations, zoning, subdivision and design review, redevelopment, and capital improvements, must be consistent with the plan.

Table 7-2 summarizes development trends in the period since the preparation of the previous hazard mitigation plan, as well as expected future development trends.

7.4 CAPABILITY ASSESSMENT
This section describes an assessment of existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning.

Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were 713

7. City of Port Hueneme
7-3
identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table in this annex identifies these as community capacity building mitigation actions.

Table 7-2. Recent and Expected Future Development Trends Criterion Response
Has your jurisdiction annexed any land since
the preparation of the previous hazard
mitigation plan?
No
Is your jurisdiction expected to annex any
areas during the performance period of this
plan?
No
Are any areas targeted for development or
major redevelopment in the next five years?
Yes
If yes, briefly describe, including whether
any of the areas are in known hazard risk
areas
Parcel located Victoria and Channel Islands, not in hazard area.

How many permits for new construction
were issued in your jurisdiction since the
preparation of the previous hazard mitigation
plan?
2016 2017 2018 2019 2020
Single Family 0 0 0 0 0
Multi-Family 0 0 0 0 0
Other (commercial, mixed use, etc.)0 0 0 0 0
Total 0 0 0 0 0
Provide the number of new-construction
permits for each hazard area or provide a
qualitative description of where development
has occurred.

From 2016 to current, there have been zero new permits issued as the City of Port Hueneme is built out to capacity.

Describe the level of buildout in the
jurisdiction, based on your jurisdiction’s
buildable lands inventory. If no such
inventory exists, provide a qualitative
description.

99.5%
The findings of the assessment are presented as follows:

An assessment of planning and regulatory capabilities is presented in Table 7-3.

Development and permitting capabilities are presented in Table 7-4.

An assessment of fiscal capabilities is presented in Table 7-5.

An assessment of administrative and technical capabilities is presented in Table 7-6.

An assessment of education and outreach capabilities is presented in Table 7-7.

Information on National Flood Insurance Program (NFIP) compliance is presented in Table 7-8.

Classifications under various community mitigation programs are presented in Table 7-9.

The community’s adaptive capacity for the impacts of climate change is presented in Table 7-10.
714
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 7-4
Table 7-3.Planning and Regulatory Capability
Local
Authority
Other Jurisdiction
Authority
State
Mandated
Integration
Opportunity?
Codes, Ordinances, & Requirements
Building Code Yes Yes Yes Yes
Comment:Article 8 Municipal Code starting 8001.(Ord. 637 § 5 Exh. A (part), 2001)“California Building Code”, the “California Residential Building Code”, and the “California Green Building Standards Code”, 2019 Editions Zoning Code Yes Yes Yes Yes
Comment:Article 10 Section 10,000(Ord. 579 § 6 (1), 1992) Subdivisions Yes Yes Yes Yes
Comment:Article 9, Section 9,000 (Ord. 579 § 5 (1), 1992) Stormwater Management Yes Yes Yes Yes
Comment:Follow County’s Reports
Post-Disaster Recovery No Yes Yes Yes
Comment:No Official plan
Real Estate Disclosure Yes Yes Yes Yes
Comment:Report of Building Records. California State Civil Code 1102 requires full disclosure on natural hazard exposure of the sale/re-sale of any and all real property. To be implemented by sellers and realtors.

Growth Management No No No No
Comment:City is built out
Site Plan Review Yes No No Yes
Comment:Section 10350
Environmental Protection Yes Yes Yes Yes
Comment:The California Environmental Quality Act (CEQA) requires state and local agencies to identify the significant environmental impacts of their actions and to avoid or mitigate those impacts, if feasible.

Flood Damage Prevention Yes Yes Yes Yes
Comment:Section 10590
Emergency Management Yes Yes Yes Yes
Comment:Police Department Emergency Manager
Climate Change No Yes Yes Yes
Comment:In Development
Planning Documents
General Plan Yes No Yes Yes
Is the plan compliant with Assembly Bill 2140?1998 Not Compliant Comment:2045 Will Be set for October 2021 Release
Capital Improvement Plan Yes No Yes Yes
How often is the plan updated? 5 years
Comment:Under Development
Disaster Debris Management Plan No Yes Yes Yes
Comment:

Floodplain or Watershed Plan No Yes Yes/No No
Comment:The Ventura County Watershed Protection creates and maintains countywide plans Stormwater Plan Yes No Yes Yes
Comment:Ordinance #775
Urban Water Management Plan Yes No Yes Yes
Comment:City of Port Hueneme Urban Water Management Plan 715

7. City of Port Hueneme
7-5
Local
Authority
Other Jurisdiction
Authority
State
Mandated
Integration
Opportunity?
Habitat Conservation Plan Yes No Yes Yes
Comment:Local Costal Program
Economic Development Plan No No No No
Comment:No Official
Shoreline Management Plan No No No No
Comment:General Plan
Community Wildfire Protection Plan No Yes Yes No
Comment:Not in wildfire area, no current plan
Forest Management Plan No Yes No No
Comment:Urban Forestry
Climate Action Plan Yes No No Yes
Comment:In Process for General Plan 2045
Comprehensive Emergency Management Plan Yes Yes Yes Yes Comment:EOP Plan Scheduled to finished 12/21
Threat & Hazard Identification & Risk Assessment (THIRA)No Yes No No Comment:The County of Ventura has performed a THIRA within the past 5 years. We are currently assessing the timing and requirements for the City of Ventura.

Post-Disaster Recovery Plan Yes No Yes Yes
Comment:EOP December 2021
Continuity of Operations Plan No Yes/No Yes/No Yes/No
Comment:EOP December 2021
Public Health Plan No Yes No No
Comment:County of Ventura Public Health Department has a plan Other:Tsunami Plan No Yes Yes Yes
Comment:The County of Ventura has an existing plan that describes each City role and has been adopted locally. A revision of this document is required within the coming year 2022.

Table 7-4.Development and Permitting Capability
Criterion Response
Does your jurisdiction issue development permits? Yes
If no, who does? If yes, which department?Community Development Does your jurisdiction have the ability to track permits by hazard area? No Does your jurisdiction have a buildable lands inventory? Yes 716
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 7-6
Table 7-5.Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants Yes
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes Yes
User Fees for Water, Sewer, Gas or Electric Service Yes If yes, specify: Water/Sewer
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds No
Incur Debt through Private Activity Bonds No
Withhold Public Expenditures in Hazard-Prone Areas No
State-Sponsored Grant Programs Yes
DevelopmentImpact Fees for Homebuyers or Developers No
Table 7-6.Administrative and Technical Capability
Staff/Personnel Resource Available?
Plannersor engineerswith knowledge of land development and land management practices Yes If Yes, Department /Position:Community Development
Engineersor professionalstrained in building or infrastructure construction practices Yes If Yes, Department /Position:Public Works, Charles Cable, Don Villafana Planners or engineers with an understanding of natural hazards Yes If Yes, Department /Position:Community Development andDon Villafana Staff with training in benefit-cost analysis Yes
If Yes, Department /Position:City Contractor
Surveyors No
Personnel skilled or trained in GISapplications No
Scientist familiar with natural hazards in local area No Emergency manager Yes
If Yes, Department /Position:Emergency and Communications Manager, Police Department Grant writers No
Table 7-7.Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? No Do you use social media for hazard mitigation education and outreach? Yes If yes, briefly describe:Facebook Postings
Do you have any citizen boards or commissions that address issues related to hazard mitigation?Yes If yes, briefly describe:Currently re-developing our CERT team.

Do you have any other programs in place that could be used to communicate hazard-related information? Yes If yes, briefly describe:VC Alert, Everbridge, email, Door Knocking, Website Do you have any established warning systems for hazard events? Yes If yes, briefly describe:VC Alert
717

7. City of Port Hueneme
7-7
Table 7-8.National Flood Insurance Program Compliance
Criterion Response
What local department is responsible for floodplain management? Community Dev, PW Who is your floodplain administrator? (department/position) Tony Stewart, Charles Cable Are any certified floodplain managers on staff in your jurisdiction? No What is the date thatyour flood damage prevention ordinancewas last amended? 1/21 Does your floodplain management program meet or exceed minimum requirements?Meets When was the most recent Community Assistance Visit or Community Assistance Contact?
Not had one
Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed?
No
Are any RiskMAP projects currently underway in your jurisdiction? No Do your flood hazard maps adequately address the flood risk within your jurisdiction?Yes If no, state why.

Does your floodplain management staff need any assistance or training to support its floodplain management program?
No
Does your jurisdiction participate in the Community Rating System (CRS)? No If no, is your jurisdiction interested in joining the CRS program?Yes How many flood insurance policies are in force in your jurisdiction?a 57 What is the insurance in force?$17,732,000
What is the premium in force?$37,235
How many total loss claims have been filed in your jurisdiction?a 7 What were the total payments for losses?$846
a. According to FEMA statistics as of March 31, 2021
Table 7-9.Community Classifications
Participating? Classification Date Classified
FIPS Code Yes 0611158296 N/A
DUNS # Yes 157675430 N/A
Community Rating System No N/A N/A
Building Code Effectiveness Grading Schedule No N/A N/A Public Protection Yes 03/3X 12/21/2018
Storm Ready Yes N/A N/A
Firewise No N/A N/A
Tsunami Ready Yes N/A N/A
718
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 7-8
Table 7-10.Adaptive Capacity for Climate Change
Criterion
Jurisdiction
Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Low Comment:Addressed in 2045 Plan
Jurisdiction-level monitoring of climate change impacts Low Comment:No current ability / Port of Hueneme itself conducts studies and publishes results to public Technical resources to assess proposed strategies for feasibility and externalities Low Comment:No resources identified at this time.

Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment:None available at this time
Capital planning and land use decisions informed by potential climate impacts Medium Comment:Community Development/Public Works
Participation in regional groups addressing climate risks Low Comment:Public Works / Environmental Sustainability
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processesLow Comment:Considerations outlined in General Plan
Identified strategies for greenhouse gas mitigation efforts Low Comment:Continued research for adoption is neededfor General Plan Identified strategies for adaptation to impacts High
Comment:The current update to the General plan has addressed strategies for adaptation to impacts.

Champions for climate action in local government departments Low Comment:Local non-profits and groups address issues
Political support for implementing climate change adaptation strategies Medium Comment:City Council is supportive as well as many local organizations Financial resources devoted to climate change adaptation Low Comment:Non identified, however grants could be looked into Local authority over sectors likely to be negative impacted Low Comment:None that we are aware of at this time
Public Capacity
Local residents’ knowledge of and understanding of climate risk Low Comment:Many environmentalists in our community who monitor and report Local residents’ supportof adaptation efforts Low
Comment:Local residences are concerned with issues and are generally supportive Local residents’ capacity to adapt to climate impacts Medium Comment:High likelihood to adapt based on our environmental position Local economy current capacity to adapt to climate impacts Low Comment: None seen.

Local ecosystems capacity to adapt to climate impacts Medium Comment: Nota lot of ecosystems
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. 719

7. City of Port Hueneme
7-9

7.5 INTEGRATION REVIEW
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as general planning and capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future.

Resources listed at the end of this annex were used to provide information on integration. The progress reporting process described in Volume 1 of the hazard mitigation plan will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration.

7.5.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs:

City of Port Hueneme:General Plan
City of Port Hueneme:Emergency Operations Plan (EOP)
Ventura County:Operational Area Emergency Operations Plan

7.5.2 Opportunities for Future Integration
The capability assessment in this annex indicates opportunities to integrate this mitigation plan with other jurisdictional planning/regulatory capabilities. Capabilities were identified as integration opportunities if they can support or enhance the actions identified in this plan or be supported or enhanced by components of this plan. The capability assessment identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future:

City of Port Hueneme: General Plan—This comprehensive effort is underway and will be integrated into this effort to be compliant with AB2140.

City of Port Hueneme: Citizen Emergency Response Team (CERT)—This effort will be a collaboration between the following: CERT volunteers, City staff, community-based organizations, with the existing CERT team manual.

Taking action to integrate each of these programs with the hazard mitigation plan was considered as a mitigation action to include in the action plan in this annex.

7.6 RISK ASSESSMENT

7.6.1 Jurisdiction-Specific Natural Hazard Event History Table 7-11 lists past occurrences of natural hazards for which specific damage was recorded in this jurisdiction Other hazard events that broadly affected the entire planning area, including this jurisdiction, are listed in the risk assessments in Volume 1 of this hazard mitigation plan. 720
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 7-10
Table 7-11.Past Natural Hazard Events
Type of Event
FEMA
Disaster # Date Damage Assessment
Erosion Events N/A Biennially, 2021
most recent
Every two years 2 million cubic yards of sand is dredged from the Port of Hueneme and deposited onto the east side of the Port. This erosion is ongoing and threatens roads and other infrastructure and leads to habitat disruption of local species of birds.

Pandemic
COVID-19
4482-DR January 20, 2020
Continuing
Ongoing
High Wind N/A 2020 Strong surface high pressure in the Great Basin along with strong north to northeast flow aloft generated strong Santa Ana winds across Ventura and Los Angeles counties. North to northeast wind gusts up to 83 mph were reported in the mountains while gusts to 59 mph were reported across the coastal plain.

Wind Event N/A 2018 Strong surface high pressure building in the Great Basin generated strong and gusty Santa Ana winds across sections of Ventura and Los Angeles counties.

Winter Storm N/A 2018 Strong surface high pressure in the Great Basin helped to generate a moderate Santa Ana wind event across Southern California. Strong northeast winds were reported across the mountains and valleys of Ventura and Los Angeles Counties.

Tornado N/A 2018 A powerful winter storm brought significant rain, snow and wind to the area.

Rainfall totals ranged from 1 to 2 inches across coastal and valleys areas with 2 to 4 inches in the foothills and mountains. With snow levels dropping to between 2500 and 3500 feet, significant snowfall was reported in the mountains (up to 1 to 2 feet) and even the Antelope Valley (4 to 8 inches). Numerous road closures due to winter storm conditions were reported, including Interstate 5 through the Grapevine as well as Highways 14 and 138. Additionally, thunderstorms generated a waterspout over the coastal waters as well as a very weak tornado over Ventura Harbor.

Flash Flood N/A 2018 High pressure over the four-corners region resulted in an extended monsoonal flow pattern across Southern California. For several days, strong thunderstorms produced heavy rain, flash flooding and large hail across parts of Southern California.

Debris Flow N/A 2018 A powerful early-season winter storm moves across Southwestern California on Halloween night. The storm produced some significant rainfall with amounts in the coastal areas ranging from 0.25 to 1.50 while the mountains received up to

2.00. In the Camarillo area, near the Springs burn scar, a mud/debris flow occurred. Otherwise just some minor nuisance flooding was reported.

Thunderstorm N/A 2017 A powerful winter storm brought heavy rain and snow, flash flooding and gusty winds to the area. Rainfall totals from this storm generally ranged between 2 and 6 inches with locally higher amounts in some foothill areas. With such rainfall amounts, there was significant snowfall totals in the local mountains with up to 28 inches of snow reported at the resort level. Additionally, the heavy rain did generate several flash flooding events including several mud and debris flows.

High Surf N/A 4/2014 High tides and strong surf damaged the pier, beach and local streets causing road damage, pipe damage and damage to the pier.

Tsunami March 11, 2011 7.1 earthquake in Japan. Damage to local harbors, marinas and docks Tsunami February 27, 2010 8.8 Quake in Chile. Damage to local harbors, marinas and docks Northridge
Earthquake
DR-1008 January
17 – November 30,
1994
Power and communications disruptions, damage to structures St Francis Dam
Disaster
March 12, 1928 $7 Million (1928)—Inundation of nearly the entire city, flooding, debris flows, destruction of infrastructure, high loss of life
721

7. City of Port Hueneme
7-11

7.6.2 Hazard Risk Ranking
Table 7-12 presents a local ranking of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property, and the economy. Mitigation actions primarily target hazards with high and medium rankings.

Table 7-12.Hazard Risk Ranking
Rank Hazard Risk RankingScore Risk Category
1 Dam Failure 36 High
2 Earthquake 32 Medium
3 Severe Storms 24 Medium
4 Severe Weather 24 Medium
5 Landslide 18 Medium
6 Flooding 15 Low
7 Tsunami 14 Low
8 Drought 9 Low
9 Sea Level Rise 6 Low

7.6.3 Jurisdiction-Specific Vulnerabilities
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. This section provides information on a few key vulnerabilities for this jurisdiction. Available jurisdiction-specific risk maps of the hazards are provided at the end of this annex.

Repetitive Loss Properties
Repetitive loss records are as follows:

Number of FEMA-identified Repetitive-Loss Properties: 0 Number of FEMA-identified Severe-Repetitive-Loss Properties: 0 Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 0
Other Noted Vulnerabilities
The following jurisdiction-specific issues have been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources:

Street and Urban Flooding—There are numerous areas of the city that flood to varying degrees during periods of high rain. The effects of this flooding range from street closures to damage to property, vehicles and buildings.

Power Outages/Emergency Power—Local power outages have resulted from high winds and storm conditions as well as from the effects of wildland fire in the region. Many key city buildings including the Main City Hall and Council Chambers buildings have no backup power or emergency generators.
722
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 7-12
Debris Flows-Following heavy rains and winter storms, substantial debris flows have occurred in the Santa Clara River, Ventura River, as well as local streams and culverts. Debris flows following wildland fires are particularly bad and can require removal of material from streams, streets, culverts and beaches.

Liquefaction Potential—Nearly the entire City of Port Hueneme is in a “Liquefaction Zone”.

The effects and damage caused by seismic activities can be amplified resulting in increased damage to buildings and infrastructure.

Homeless Population-A significant number of persons commonly defined as “Homeless” live on and around our local beach. During high tides and significant tidal pushes, the homeless are at greater risk.

Tsunami Awareness and Notification—Port Hueneme has many visitors to its beach who may not be aware of the tsunami risk. The City does not have tsunami warning sirens.

Wildfire Smoke—During wildfire events in the region the air quality in the City can become hazardous, especially when the Santa Ana winds push wildfire smoke toward the coast. Wildfire can trigger PSPS events, which amplify the hazard when city buildings lacking backup power cannot operate air conditioning systems.

Actions addressing these issues were prioritized for consideration in the action plan in this annex.

7.7 STATUS OF PREVIOUS PLAN ACTIONS
Table 7-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared.

Table 7-13.Status of Previous Plan Actions
Removed;
Carried Over to Plan
Update
Action Item Completed
No Longer
Feasible
Check if
Yes
Action # in
Update
OA 6—Develop a public outreach program that informs property owners located in the dam and levee failure inundation areas about voluntary flood insurance.

PHE-7
Comment:Action status unknown due to staff turnover
OA 10—Seismically retrofit or upgrade seismically deficient government facilities and pre-identified shelter facilities.

PHE-1
Comment:Not completed due to lack of funding and staff capacity OA 11—Develop and implement plans to increase the building owner’s general knowledge of and appreciation for the value of seismic upgrading of the building’s structural and nonstructural elements.

PHE-9
Comment:Action status unknown due to staff turnover
OA 13—Reinforce roads/bridges from flooding through protection activities, including elevating the roads/bridges and installing/widening culverts beneath the roads/bridges or upgrading storm drains.

PHE-10
Comment:City does not have bridges but storm drain upgrades are in process in the location of the beach. Continued work needs to continue on other parts of the city.

OA 18—Continue to participate in the NWS TsunamiReady Program through continued implementation of Guideline 4: Community Preparedness measures, including public outreach material and curriculum.

PHE-11
Comment:Continued participation in the program
723

7. City of Port Hueneme
7-13

7.8 HAZARD MITIGATION ACTION PLAN
Table 7-14 lists the identified actions, which make up the hazard mitigation action plan for this jurisdiction. Table 7-15 identifies the priority for each action. Table 7-16 summarizes the mitigation actions by hazard of concern and mitigation type.

Table 7-14.Hazard Mitigation Action Plan Matrix
BenefitsNew or
Existing AssetsObjectives Met Lead Agency
Support
Agency
Estimated
Cost Sources of FundingTimelinea
Action PHE-1—Mitigate beach erosion to protect shoreline roads, properties, harbor facilities, and the natural habitat, including endangered species.

Hazards Mitigated:Flooding, Sea Level Rise, Tsunami, Severe Storms New & Existing 2, 13, 14, 18 USACE Public Works Medium General Funds, FEMA

HMA (BRIC, FMA,
HMGP)
Ongoing
Action PHE-2—Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.

Hazards Mitigated:Landslide, Earthquake, Severe Storms, Severe Weather, Flooding, Wildfire, Dam Failure, Sea Level Rise, Tsunami Existing 1,4,6,9,10,11,16 Public Works Community
Development
High FEMA HMA (BRIC, FMA,
HMGP)
Short-term
Action PHE-3—Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions inthe community, including shoreline development.

Hazards Mitigated:Landslide, Earthquake, Severe Storms, Severe Weather, Flooding, Wildfire, Dam Failure, Sea Level Rise, Tsunami, Drought
New & Existing 1, 2, 10, 11, 12, 15,
16, 19
Community Development Public Works Low Staff Time, General Funds
Ongoing
Action PHE-4—Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.

Hazards Mitigated:Landslide, Severe Storms, Severe Weather, Flooding, Wildfire, Dam Failure, Sea Level Rise, Tsunami, Drought New & Existing1, 2, 3, 4, 6, 10, 15,
17, 19
Community DevelopmentPublic Works Low Staff Time, General Funds
Short-term
Action PHE-5—Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements:

Enforce the flood damage prevention ordinance.

Participate in floodplain identification and mapping updates.

Provide public assistance/information on floodplain requirements and impacts.

Hazards Mitigated:Severe Storms, Severe Weather, Flooding, Dam Failure, Sea Level Rise, Tsunami New & Existing1, 2, 4, 6, 9, 10, 11,
13, 14, 15, 17, 18, 19
Public Works Low Staff Time, General
Funds
Ongoing
Action PHE-6—Identify and pursue strategies to increase adaptive capacity to climate change including but not limited to the following:

Adopt a Climate Action Plan to reflect new State legislation, changing priorities, and environmental sustainability and greenhouse gas (GHG) reduction policies and goals.

Adopt modifications to existing plans and procedures to meet climate change issues and impacts.

Hazards Mitigated:Landslide, Severe Storms, Severe Weather, Flooding, Wildfire, Dam Failure, Sea Level Rise, Tsunami, Drought New & Existing1, 3, 4, 9, 10, 13, 14,
15, 16, 17, 19
Community DevelopmentPublic Works Low Staff Time, General Funds
Short-term
Action PHE-7—Purchase generators for critical facilities and infrastructure that lack adequate backup power, including the Emergency Operations Center and other critical facilities throughout the city.

Hazards Mitigated:Dam Failure, Earthquake, Flooding, Landslide, Severe Weather, Tsunami, Wildfire Existing 1, 2, 7, 10 Public Works City ManagerMedium General Funds, FEMA

HMA (BRIC, HMGP)
Long-term
724
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 7-14
BenefitsNew or
Existing AssetsObjectives Met Lead Agency
Support
Agency
Estimated
Cost Sources of FundingTimelinea
Action PHE-8—Develop a public outreach program that informs property owners located in the dam and levee failure inundation areas about voluntary flood insurance.

Hazards Mitigated:Severe Storms, Severe Weather, Flooding, Dam Failure, Sea Level Rise, Tsunami Existing 1, 2, 7, 10, 17, 19Community Development Low Staff Time/ General Funds
Short-Term
Action PHE-9-–Develop and implement plans to increase the building owner’s general knowledge of and appreciation for the value of seismic upgrading of the building’s structural and nonstructural elements.

Hazards Mitigated:Earthquake
Existing 1, 2, 7, 10, 17, 19Community DevelopmentPublic Works Low Staff Time / General FundShort-Term Action PHE-10—Reinforce roads from flooding through protection activities, including elevating the roads and installing/widening culverts beneath the roads/bridges or upgrading storm drains.

Hazards Mitigated:Severe Storms, Severe Weather, Flood, Sea Level Rise, Tsunami Existing 2, 4, 6, 9, 11 Public Works Medium FEMA HMA (BRIC, FMA, HMGP)
Long-Term
Action PHE-11—Continue to participate in the NWS TsunamiReady and StormReady Programs through continued implementation of Guideline 4: Community Preparedness measures, including public outreach material and curriculum.

Hazards Mitigated:Severe Storms, Severe Weather, Flood, Sea Level Rise, Tsunami New & Existing 1, 2, 6, 7, 8, 12, 17,
18, 19
Public Works Low General Funds Ongoing
Action PHE-12—Install City tsunami warning siren network.

Hazards Mitigated:Tsunami
New & Existing 1, 2, 7 Public Works Medium FEMA HMA (BRIC, FMA, HMGP)
Short-Term
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date
Acronyms used here are defined at the beginning of this volume.

Table 7-15.Mitigation Action Priority
Action #
# of
Objectives
Met BenefitsCosts
Do Benefits
Equal or
Exceed Cost?
Is Project
Grant-
Eligible?
Can Project Be Funded
Under Existing
Programs/ Budgets?
Implementation
Prioritya
Grant
Pursuit
Prioritya
1 4 High Medium Yes Yes Yes High High
2 7 High High Yes Yes No Medium High
3 8 Medium Low Yes No Yes High Low
4 9 Medium Low Yes No Yes High Low
5 13 Medium Low Yes No Yes High Low
6 11 Medium Low Yes No Yes High Medium
7 4 High Medium Yes Yes No Medium High
8 6 Low Low Yes No Yes High Low
9 6 Low Low Yes No Yes High Low
10 5 High Medium Yes Yes No Medium High
11 9 Medium Low Yes No Yes High Medium
12 3 MediumMedium Yes Yes No Medium Medium
a. See the introduction to this volume for explanation of priorities. 725

7. City of Port Hueneme
7-15
Table 7-16.Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention
Property
Protection
Public
Education &
Awareness
Natural
Resource
Protection
Emergency
Services
Structural
Projects
Climate
Resilience
Community
Capacity
Buildingb
High-Risk Hazards
Dam Failure PHE-5 PHE-2 PHE-8 PHE-7 PHE-6 PHE-3, 4, 5, 6 Medium-Risk Hazards
Earthquake PHE-2 PHE-9 PHE-7 PHE-6 PHE-3, 4, 6
Severe Storms PHE-5 PHE-2, 10 PHE-8 PHE-1 PHE-10 PHE-6 PHE-3, 4, 5, 6, 11 Severe WeatherPHE-5 PHE-2, 10 PHE-8 PHE-7 PHE-10 PHE-6 PHE-3, 4, 5, 6, 11 Landslide PHE-2 PHE-7 PHE-6 PHE-3, 4, 6
Low-Risk Hazards
Flooding PHE-5 PHE-2, 10 PHE-8 PHE-1 PHE-7 PHE-10 PHE-6 PHE-3, 4, 5, 6, 11 Tsunami PHE-5, 12 PHE-2, 10 PHE-8, 12 PHE-1 PHE-7, 12 PHE-10 PHE-6 PHE-3, 4, 5, 6, 11 Drought PHE-2 PHE-6 PHE-3, 4, 6
Sea Level Rise PHE-5 PHE-2, 10 PHE-8 PHE-1 PHE-6 PHE-3, 4, 5, 6, 11 a. See the introduction to this volume for explanation of mitigation types. b. Note that the jurisdiction did not identify a need for expansion of financial capabilities, based on existing capabilities. The intent of this hazard mitigation plan is to expand the financial capability of the jurisdiction.

7.9 PUBLIC OUTREACH
Table 7-17 lists public outreach activities for this jurisdiction.

Table 7-17.Local Public Outreach
Local Outreach Activity Date
Number of People
Involved
Social media and website ( in coordination with General Plan) 9-02 45

7.10 INFORMATION SOURCES USED FOR THIS ANNEX
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex.

City of Port Hueneme Municipal Code—The municipal code was reviewed for the full capability assessment and for identifying opportunities for action plan integration.

City of Port Hueneme General Plan—The General Plan is under revision and had been aligned to be compliant with AB2140. It was reviewed for the capability assessment and action plan development.

The following outside resources and references were reviewed:

Hazard Mitigation Plan Annex Development Toolkit—The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan.
726
Oxnard
Port Hueneme
Food, Water, Shelter
Safety and Security
Selected City
Incorporated Cities
County Boundary
Data Sources: Ventura Co., VCFD,
Casitas MWD, Calleguas MWD,
City of Camarillo, CA Energy
Commission, Cal Trans, EPA,
HIFLD, Esri
Port Hueneme
Critical Facilities (1 of 2)
0 0.35 0.70.175 Miles
727
Oxnard
Port Hueneme
Communications
Energy
Hazardous Material
Transportation
Selected City
Incorporated Cities
County Boundary
Data Sources: Ventura Co., VCFD,
Casitas MWD, Calleguas MWD,
City of Camarillo, CA Energy
Commission, Cal Trans, EPA,
HIFLD, Esri
Port Hueneme
Critical Facilities (1 of 2)
0 0.35 0.70.175 Miles
728
Oxnard
Port Hueneme
Data Sources: Ventura Co.,
CA DWR, Esri
Port Hueneme
Dam Failure
Inundation Areas
0 0.35 0.70.175 Miles
Combined Inundation
Areas
Selected City
Incorporated Cities
County Boundary
729
Oxnard
Port Hueneme
Data Sources: Ventura Co.,
CGS, Esri
Port Hueneme
NEHRP Soil Class
0 0.35 0.70.175 Miles
D (Stiff soil)
Selected City
Incorporated Cities
County Boundary
730
Oxnard
Port Hueneme
Data Sources: Ventura Co.,
Esri
Port Hueneme
Liquefaction Susceptibility
0 0.35 0.70.175 Miles
Liquefaction zone
Selected City
Incorporated Cities
County Boundary
731
Oxnard
Port Hueneme
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Port Hueneme
100-Year Probabilistic
Earthquake Scenario
0 0.35 0.70.175 Miles
Mercalli Intensity Scale
VII (Very Strong/Moderate)
Selected City
Incorporated Cities
County Boundary
732
Oxnard
Port Hueneme
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Port Hueneme
Oak Ridge M7.16
Earthquake Scenario
0 0.35 0.70.175 Miles
Mercalli Intensity Scale
VII (Very Strong/Moderate)
VIII (Severe/Moderate-Heavy)
Selected City
Incorporated Cities
County Boundary
733
Oxnard
Port Hueneme
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Port Hueneme
Pitas Point M7.12
Earthquake Scenario
0 0.35 0.70.175 Miles
Mercalli Intensity Scale
VII (Very Strong/Moderate)
Selected City
Incorporated Cities
County Boundary
734
Oxnard
Port Hueneme
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Port Hueneme
San Cayetano M7.16
Earthquake Scenario
0 0.35 0.70.175 Miles
Mercalli Intensity Scale
VI (Strong/Light)
Selected City
Incorporated Cities
County Boundary
735
Oxnard
Port Hueneme
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Port Hueneme
S. San Andreas M8.03
Earthquake Scenario
0 0.35 0.70.175 Miles
Mercalli Intensity Scale
V (Moderate/Very Light)
VI (Strong/Light)
Selected City
Incorporated Cities
County Boundary
736
Oxnard
Port Hueneme
Data Sources: Ventura Co.,
FEMA, Esri
Port Hueneme
FEMA Flood Hazard Areas
0 0.35 0.70.175 Miles
1% Annual Chance
Flood (100-Year)

0.2% Annual Chance
Flood (500-Year)
Selected City
Incorporated Cities
County Boundary
737
Oxnard
Port Hueneme
Data Sources: Ventura Co.,
CGS, Esri
Port Hueneme
Susceptibility to
Deep-Seated Landslides
0 0.35 0.70.175 Miles
Low
Moderate
High
Very High
Selected City
Incorporated Cities
County Boundary
738
Oxnard
Port Hueneme
Data Sources: Ventura Co.,
OCOF, Esri
Port Hueneme
Sea Level Rise
of 25 cm (9.8 in.)
0 0.35 0.70.175 Miles
Sea Level Rise
Inundation Area
Selected City
Incorporated Cities
County Boundary
739
Oxnard
Port Hueneme
Data Sources: Ventura Co.,
OCOF, Esri
Port Hueneme
Sea Level Rise
of 100 cm (39.4 in.)
0 0.35 0.70.175 Miles
Sea Level Rise
Inundation Area
Selected City
Incorporated Cities
County Boundary
740
Oxnard
Port Hueneme
Data Sources: Ventura Co.,
CGS, Esri
Port Hueneme
Tsunami Inudation Zones
0 0.35 0.70.175 Miles
Inundation Zones
Selected City
Incorporated Cities
County Boundary
741
8-1

8. CITY OF SANTA PAULA

8.1 LOCAL HAZARD MITIGATION PLANNING TEAM
Primary Point of Contact Alternate Point of Contact
Scott Varner, Support Services Commander
214 S. 10thStreet
Santa Paula, CA 93060
805-525-4474 ext. 105
[email protected]
Kate Bader, CSO
214 S. 10thStreet
Santa Paula, CA 93060
805-525-4474 ext. 113
[email protected]
This annex was developed by the local hazard mitigation planning team, whose members are listed in Table 8-1.

Table 8-1.Local Mitigation Planning Team Members
Name Title
Dan Singer City Manager
James Mason Community & Economic Development Director
Jeff Mitchem Planning Manager
Tom Tarantino Associate Planner
Alexander Wallsten Administrative Analyst

8.2 JURISDICTION PROFILE

8.2.1 Location and Features
The City of Santa Paula is in Ventura County, California, United States.

The current boundaries generally extend out from 34.3542° N, 119.0593° W, encompassing an area of

5.69 square miles.

The City of Santa Paula, California is located 65 miles northwest of Los Angeles and 14 miles east of Ventura and the coastline of the Pacific Ocean. Santa Paula is near the geographical center of Ventura County, situated in the rich agricultural Santa Clara River Valley. The City is surrounded by rolling hills and rugged mountain peaks in addition to orange, lemon, and avocado groves. In fact, Santa Paula is referred to as the “Citrus Capital of the World.”
742
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 8-2

8.2.2 History
The city of Santa Paula was incorporated in 1902. The original community that has become known as Santa Paula was established by the Chumash Indians as the villages of Mupu and Srswa. The land was later given away as part of a Spanish land grant to Rancho Santa Paula and Saticoy in 1840. In the 1860s the area was subdivided into small farms. In 1880, oil was discovered in Santa Paula leading to the formation of the Union Oil Company in 1890. The City of Santa Paula was incorporated on April 22, 1902. In the early 1900s Santa Paula was considered the pre-Hollywood film capital, the “Queen of the Silver Screen.” Even today, Santa Paula is noted for its movie personalities (silent and sound) who resided in and adjacent to the city and a TV or movie crew is not an unusual sight in the community.

8.2.3 Governing Body Format
The City of Santa Paula assumes responsibility for the adoption of this plan; the City Manager will oversee its implementation.

The City of Santa Paula is governed by a five-member city council. The City consists of eight departments: Administration, City Clerk, Community and Economic Development, Finance, Human Resources, Parks & Recreation, Police, and Public Works. The city has 10 commissions and task forces, which report to the City Council. The City currently employs a total of 126 employees, 98 of which are full-time.

8.3 CURRENT TRENDS

8.3.1 Population
According to the California Department of Finance, the population of the Santa Paula as of January 2020 was 30,389. Since 2010, the population has grown at an average annual rate of 0.27 percent.

8.3.2 Development
Development interest in Santa Paula has greatly increased in recent years, particularly since construction began on the highly visible East Area 1 / Harvest at Limoneira project. As Santa Paula is surrounded by a mix of greenbelt and urban curb restrictions, the majority of development proposals are for infill and adaptive reuse projects—areas where Santa Paula offers numerous opportunities.

Recent legislation aimed at streamlining the entitlement process for housing projects has also generated a great deal of interest from developers.

Table 8-2 summarizes development trends in the period since the preparation of the previous hazard mitigation plan, as well as expected future development trends. 743

8. City of Santa Paula
8-3
Table 8-2.Recent and Expected Future Development Trends Criterion Response
Has your jurisdiction annexed any land since the
preparation of the previous hazard mitigation plan?
No
Is your jurisdiction expected to annex any areas during the performance period of this plan?
Yes, Santa Paula West Business Park
If yes, describe land areas and dominant uses.The Santa Paula West Business Park is located on 53 acres of agricultural land, currently zoned AE-40 (Agricultural Exclusive, 40 acre minimum parcel size) in the County of Ventura, on the southwestern boundary of the City of Santa Paula. It is bound to the north by Telegraph Road and residential property (zoned MHP and R-2), to the east by existing industrial and commercial development (zoned CG and C-LI), to the south by agriculture (zoned AE 40 in the County of Ventura) and to the west by the Adams Creek and agriculture (zoned AE-40 in the County of Ventura).

The area is identified as SP-6, West Area 2 in the City of Santa Paula’s General Plan. It is within the Sphere of Influence and the city urban restriction boundary of the City of Santa Paula with frontage along State Route 126 and Telegraph Road and is bisected by the railroad right-of- way. While it is just west of the Santa Paula City limits, the area is outside of the Santa Paula -Ventura Greenbelt. Annexation of the Santa Paula West Business Park into the City of Santa Paula has been approved by the City Council, and is currently under review by Ventura County LAFCo.

If yes, who currently has permitting authority over these areas?
County of Ventura
Are any areas targeted for development or major
redevelopment in the next five years?
Yes
If yes, briefly describe, including whether any of the
areas are in known hazard risk areas
Santa Paula West Business Park (SP-6/West Area 2), see above.

East Area 1 / Harvest at Limoneira—500-acres on eastern end of the City.

Remaining 1,100 homes (of approved 1,500) to be constructed under adopted Specific Plan, along with commercial areas and park facilities.

Hazard mitigation included in EA1 Specific Plan (SP-3)/EIR.

How many permits for new construction were issued in
your jurisdiction since the preparation of the previous hazard mitigation plan?
2016 2017 2018 2019 2020
Single Family 4 10 2 41 174
Multi-Family 8 0 11 0 0
Other (commercial, mixed
use, etc.)
1 2 1 1 0
Total 13 12 14 42 174
Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development has occurred.

Hillside residences along northerly city boundary are either within or abutting high-fire risk areas as defined by CAL FIRE/VCFPD. Residences and businesses, including a portion of those in the new East Area 1/Harvest at Limoneira development, on the east end of the city are within FEMA flood hazard areas of Santa Paula Creek and/or Santa Clara River.

These flood/liquefaction hazards have been mitigated by requirements of applicable Specific Plan(s) or development conditions.

Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description.

Santa Paula is largely built-out within city limits.Remaining pockets of developable land within city limits are situated near the southeast and southwest corners. These areas either have development proposals (with hazard mitigation) under review, or an adopted Specific Plan (also including hazard mitigation).
744
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 8-4

8.4 CAPABILITY ASSESSMENT
This section describes an assessment of existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning.

Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table in this annex identifies these as community capacity building mitigation actions. The findings of the assessment are presented as follows:

An assessment of planning and regulatory capabilities is presented in Table 8-3.

Development and permitting capabilities are presented in Table 8-4.

An assessment of fiscal capabilities is presented in Table 8-5.

An assessment of administrative and technical capabilities is presented in Table 8-6.

An assessment of education and outreach capabilities is presented in Table 8-7.

Information on National Flood Insurance Program (NFIP) compliance is presented in Table 8-8.

Classifications under various community mitigation programs are presented in Table 8-9.

The community’s adaptive capacity for the impacts of climate change is presented in Table 8-10.

Table 8-3.Planning and Regulatory Capability
Local
Authority
Other Jurisdiction
Authority
State
Mandated
Integration
Opportunity?
Codes, Ordinances, & Requirements
Building Code Yes No Yes No
Comment:2019 California Building Code
Zoning Code Yes No Yes Yes
Comment:COSP Municipal Code, Chapter 16
Subdivisions Yes No Yes Yes
Comment:State Subdivision Map Act
COSP Municipal Code, Chapter 16.80 Subdivision Regulations Stormwater Management Yes No Yes No
Comment:COSP Municipal Code, Chapter 54
Post-Disaster Recovery Yes No Yes Yes
Comment:COSP Municipal Code, Chapter 150
Real Estate Disclosure Yes No Yes No
Comment:COSP Municipal Code, Chapter 156.043
Growth Management Yes No Yes No
Comment:COSP Municipal Code, Chapter 16.106 (7-19-04)
Site Plan Review Yes No Yes Yes
Comment:COSP Municipal Code, Chapter 16.226
Environmental Protection Yes No Yes No
Comment:COSP Municipal Code, Chapter
745

8. City of Santa Paula
8-5
Local
Authority
Other Jurisdiction
Authority
State
Mandated
Integration
Opportunity?
Flood Damage Prevention Yes No Yes Yes
Comment:COSP Municipal Code, Chapter 151
Emergency Management Yes No Yes Yes
Comment:COSP Emergency Operations Plan 2019
Climate Change Yes No Yes No
Comment:COSP 2040 General Plan 4-6 Environmental and Cultural Resources, C. Air Quality and Greenhouse Gases Planning Documents
General Plan Yes No Yes Yes
Is the plan compliant with Assembly Bill 2140?Yes
Comment:COSP 2040 General Plan
Capital Improvement Plan Yes No Yes Yes
How often is the plan updated? Annually (Five Years)
Comment:California Government Code §65103(c); COSP 2040 General Plan Disaster Debris Management Plan Yes Yes Yes Yes
Comment:Ventura County Disaster Recovery Plan, Adopted by BOS in April 2019 Floodplain or Watershed Plan Yes No Yes Yes
Comment:The City participates in the National Flood Insurance Program (NFIP) Stormwater Plan Yes No Yes No
Comment:Ventura County Storm Water Quality Management Program, COSP 2024 General Plan 4-6 Environmental and Cultural Resources, H. Water Quality
Urban Water Management Plan Yes No Yes No
Comment:COSP 2020 Urban Water Management Plan
Habitat Conservation Plan No No No Yes
Comment:N/A
Economic Development Plan Yes No No Yes
Comment:City Council Strategic Goals Approved July 2021//Economic Development Strategic Plan under development Shoreline Management Plan No No No No
Comment:N/A
Community Wildfire Protection Plan Yes Yes Yes Yes
Comment:COSP Emergency Operations Plan 2019, Section 8, Threat Assessments 8—Wildland Fire Forest Management Plan No Unknown Unknown Yes
Comment:No forest area, unknown on plans or jurisdiction if required.

Climate Action Plan No Unknown Unknown Yes
Comment:N/A
Comprehensive Emergency Management Plan Yes No Yes No
Comment:COSP Emergency Operations Plan 2019
Threat & Hazard Identification & Risk Assessment (THIRA)Yes No Yes No Comment:COSP Emergency Operations Plan 2019
Section 8, Threat Summary and Assessments
Post-Disaster Recovery Plan Yes Yes Yes Yes
Comment:COSP Emergency Operations Plan 2019
Continuity of Operations Plan Yes Yes Yes Yes
Comment:COSP Emergency Operations Plan 2019Part one-35
Public Health Plan No Yes Yes Yes
Comment:COSP Emergency Operations Plan 2019addressed Public Health Emergencies, County of Ventura Health Care Agency Public Health Emergency Response Plan (ERP)
746
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 8-6
Table 8-4.Development and Permitting Capability
Criterion Response
Does your jurisdiction issue development permits? Yes
If no, who does? If yes, which department?Building and Safety Does your jurisdiction have the ability to track permits by hazard area? Yes Does your jurisdiction have a buildable lands inventory? Currently being developed Table 8-5.Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants Yes
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes Yes
User Fees for Water, Sewer, Gas or Electric Service Yes If yes, specify: Water and Sewer
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds Yes
Incur Debt through Private Activity Bonds No
Withhold Public Expenditures in Hazard-Prone Areas No
State-Sponsored Grant Programs Yes
DevelopmentImpact Fees for Homebuyers or Developers Yes Table 8-6.Administrative and Technical Capability
Staff/Personnel Resource Available?
Planners or engineers with knowledge of land development and land management practicesYes If Yes, Department /Position:Public Works/Assistant City Engineer/Community Development /Director & Manager Engineers or professionals trained in building or infrastructure construction practices Yes If Yes, Department /Position:Public Works/City Engineer Planners or engineers with an understanding of natural hazards No Staff with training in benefit-cost analysis No
Surveyors No
Personnel skilled or trained in GISapplications Yes
If Yes, Department /Position:Planning Department / Associate Planner Scientist familiar with natural hazards in local area No Emergency manager Yes
If Yes, Department /Position:Scott Varner, Commander, Santa Paula PD Grant writers No
747

8. City of Santa Paula
8-7
Table 8-7.Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? No If yes, briefly describe:Will be in development
Do you use social media for hazard mitigation education and outreach? Yes If yes, briefly describe:In process of developing education Do you have any citizen boards or commissions that address issues related to hazard mitigation?Yes If yes, briefly describe:Although not a decision making body, the Citizen Corp meets monthly Do you have any other programs in place that could be used to communicate hazard-related information?Yes If yes, briefly describe:Social Media, Nixle
Do you have any established warning systems for hazard events? Yes If yes, briefly describe:1610 AM, Social Media, County reverse 911, Nixle Table 8-8.National Flood Insurance Program Compliance
Criterion Response
Whatlocaldepartment is responsible for floodplain management? Public Works Who is your floodplain administrator? (department/position) Public Works/Public Works Director Are any certified floodplain managers on staff in your jurisdiction? No What is the date that your flood damage prevention ordinance was last amended?May 4, 2009 Does your floodplain management program meet or exceed minimum requirements?Meets If exceeds, in what ways?Enter Response
When was the most recent Community Assistance Visit or Community Assistance Contact?
June 18, 2018
Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed?
No
If so, state what they are.Enter Response
Are any RiskMAP projects currently underway in your jurisdiction? No If so, state what they are.Enter Response
Do your flood hazard maps adequately address the flood risk within your jurisdiction? No If no, state why.The current FIRM’s received from FEMA are being appealed for a variety of reasons, including significant A99 zones within the City’s jurisdictional boundary. The City will be conducting its own flood study in the coming months.

Does your floodplain management staff need any assistance or training to support its floodplain management program?
No
If so, what type of assistance/training is needed?Enter Response Does your jurisdiction participate in the Community Rating System (CRS)? No If no, is your jurisdiction interested in joining the CRS program?Yes How many flood insurance policies are in force in your jurisdiction?a 1,021 What is the insurance in force?$306,954,400
What is the premium in force?$604,233
How many total loss claims have been filed in your jurisdiction?a 63 What were the total payments for losses?$134,387
a. According to FEMA statistics as of March 31, 2021
748
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 8-8
Table 8-9.Community Classifications
Participating? Classification Date Classified
FIPS Code Yes 0611170042 N/A
DUNS # Yes 085937027 N/A
Community Rating System No N/A N/A
Building Code Effectiveness Grading Schedule Yes Unknown Unknown Public Protection Yes 03/3X 12/21/2018
Storm Ready N/A N/A N/A
Firewise N/A N/A N/A
Tsunami Ready N/A N/A N/A
Table 8-10.Adaptive Capacity for Climate Change
Criterion
Jurisdiction
Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Medium Comment:City’s General Plan acknowledges understanding of potential climate change impacts.The City does not currently have an adaptation plan. However, per the General Plan, the City has policies and procedures that will be in force for future developments, entailing strict rules that will not allow for development or construction in high risk wildfire and flood areas, respectively (HPS 2.1 & 3.1). The City’s Storm Drain Master Plan was also created to address deficiencies in existing drainage systems and identify proposed facilities needed to address deficiencies. The City also participates in the National Flood Insurance Program (HPS 2.2) which covers over 1,000 residences and has CIPs addressing potential climate change hazards such as the Water Recycling Facility Floodwall, project #9039, funded through SB1.

Jurisdiction-level monitoring of climate change impacts Low Comment:City itselfdoes not have a committee or task force that monitors climate change impacts. The City does however make informed decisions based on risk zones identified by external sources, such as FEMA, CAL Fire, Ventura County Fire, and USGS. The City updates risk zones as new data is supplied by these external sources and applies the updated information to future decision-making and land use.

Technical resources to assess proposed strategies for feasibility and externalities Low Comment:City does not have any resources specifically dedicated to climate change impacts. City works in collaboration with Ventura County Watershed Protection to protect watercourses, public highways, life, and property from damage or destruction from floodwaters, and Ventura County Fire District in efforts to mitigate future fire risks as guided by the Ventura County Unit Strategic Fire Plan.

Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment:City does not have resources dedicated to greenhouse gas inventory. City would cooperate with Ventura County Air Pollution Control District under guidelines imposed by AB 617 to develop and implement emissions reporting, monitoring, and reduction plans and measures.

Capital planning and land use decisions informed by potential climate impacts Medium Comment:City’s General Plan outlines policies and procedures that will be in force for future development that bars construction in designated high risk zones, and for other developments outside those zones requires current Federal, State, and City parameters be met during construction (HPS 2.1 & 3.1). The City has been informed of risk zones as have been identified in FEMA’s Flood Hazard Zones map (2018), Ventura County’s Countywide Dam Failure Inundation Areas map (2014), Santa Paula Safety Element Fire History map (2015) detailing Wildland Fire History, and CAL Fire’s Wildland Fire Hazard Areas (2020) detailing fire risk zones in the Santa Paula area.

Participation in regional groups addressing climate risks Low Comment:City complies with Ventura County ordinances and participates in the Ventura County Watershed Protection Program to protect watercourses and property from damage or destruction from floodwaters and the Ventura County Unit Strategic Fire Plan to mitigate future fire risks.
749

8. City of Santa Paula
8-9
Criterion
Jurisdiction
Ratinga
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Low Comment:City does not have a direct mandate that states decision-making must consider climate change impacts. Notwithstanding, the City’s General Plan outlines policies and procedures for future development and CIPs that take into account and seek to mitigate climate change hazards. City Council meets every other week and is open to the public to vote on city budgetary and CIP related issues. The Public Works Director is present to provide and inform Council and the public of climate related information as it pertains to project proposals and budge dispensations.

Identified strategies for greenhouse gas mitigation efforts Low Comment:City is in the process of exploring EV technology options and allowing third party alternative energy companies licenses to operate to install and maintain EV charging stations and solar panels.

Identified strategies for adaptation to impacts Medium
Comment:City General Plan outlines risk zones and policies for development going forward. Land use policies outlined will bar new development in areas deemed high risk flood zones or high risk wildfire zones (HPS 2.1 & 3.1). The General Plan outlines CIPs to be developed and funded that address climate induced hazards related to flooding (HPS 2.c), programs to be .

Champions for climate action in local government departments Low Comment:City does not have a dedicated department or staff to climate action initiatives. Although there are no direct committees dedicated to this task, Public Works is focused on complying with federal, state, and county regulations. PW has developed a General Plan that acknowledges and plans around known risk zones with the goal of mitigating future hazards and restricting further development into high risk zones.

Political support for implementing climate change adaptation strategies Medium Comment:City Council is on board with climate change adaptation projects if they are projects that would reduce energy usage and increase energy efficiency. An Energy Efficiency Program will go before Council in Dec 2021 to vote on energy programs to implement. Council members are supportive of projects and initiatives if they will provide the community with a measurable return value or if they will directly aid further development of the city.

Financial resources devoted to climate change adaptation Low Comment:City does not allocate resources specifically to climate change adaptation projects. Portions of the budget may be spent on future CIPs related to climate change adaptation.

Local authority over sectors likely to be negative impacted Medium Comment:City has emergency shelters in place that have basic resourcesthat have been used in the recent past duringthe Thomas Fire. Santa Paula Police have developed evacuation protocols that are enacted when necessary and in coordination with Ventura County Office of Emergency Services and Ventura County Human Services Agency.

Public Capacity
Local residents’ knowledge of and understanding of climate risk Medium Comment:The City does not currently send out informational media content related to climate risks. City residents pay into the National Flood Insurance Program and are aware of the potential flood risks in their area.

Local residents’ supportof adaptation efforts Medium
Comment:Residents are supportive of adaptation efforts that directly benefit them. Residents may not be as supportive if these adaptation efforts were to take funding from projects that would impact them in a short term time frame, such as repaving of streets that are in a state of disrepair.

Local residents’ capacity to adapt to climate impacts Low Comment:The City’s per capita income is 68% of the national, and the poverty rate is greater than the national average at 14.2% (Census Bureau). Residents have a limited capacity for adaptation and are reliant upon the city to make preparations and fund projects that would mitigate climate induced hazards such as floods or wildfires.

Local economy current capacity to adapt to climate impacts Low Comment:Scope of climate impact will dictate the economy’s capacity to adapt. Based on FEMA’s updated Ventura County flood maps for communities along Santa Clara River the base floodplain level has risen and portions of the city south of Hwy 126 now exist in a FEMA identified base floodplain zone. Significant portions of the city to the west and east of Santa Paula Creek as well as to the north of Hwy 126 fall within a federally protected A99 zone having met specific requirements. The breaking of the one of four dams located northeast of the city could incur significant cost damages. Also the breaking of a levee could incur damages and rebuilding of said levee would require significant public funding that may not be readily reallocated. 750
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 8-10
Criterion
Jurisdiction
Ratinga
Local ecosystems capacity to adapt to climate impacts Low Comment:The local ecosystem consists largely of the Santa Clara River watershed which is protected in cooperation with Ventura County Watershed Protection. Wildfires have burned through the foothills to the north and east of the city, including the Thomas Fire (2017) and Simi Fire (2003), respectively. Extensive research and study has not been conducted to ascertain the long-term ecosystem damage or recovery of the region. a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.

8.5 INTEGRATION REVIEW
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as general planning and capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future.

Resources listed at the end of this annex were used to provide information on integration. The progress reporting process described in Volume 1 of the hazard mitigation plan will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration.

8.5.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs:
2040 General Plan—four-year update process recently completed (late 2021).

Draft Urban Water Management Plan (UWMP) and Water Shortage Contingency Plan— updated documents in final stages of review.

8.5.2 Opportunities for Future Integration
The capability assessment in this annex indicates opportunities to integrate this mitigation plan with other jurisdictional planning/regulatory capabilities. Capabilities were identified as integration opportunities if they can support or enhance the actions identified in this plan or be supported or enhanced by components of this plan. The capability assessment identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future:
2029 Housing Element—draft HE Update currently under review w/CA HCD Taking action to integrate each of these programs with the hazard mitigation plan was considered as a mitigation action to include in the action plan in this annex. 751

8. City of Santa Paula
8-11

8.6 RISK ASSESSMENT

8.6.1 Jurisdiction-Specific Natural Hazard Event History Table 8-11 lists past occurrences of natural hazards for which specific damage was recorded in this jurisdiction Other hazard events that broadly affected the entire planning area, including this jurisdiction, are listed in the risk assessments in Volume 1 of this hazard mitigation plan.

Table 8-11.Past Natural Hazard Events
Type of Event
FEMA
Disaster # Date Damage Assessment
Thomas Fire FM-5224 2017 281,893 acres burned over the course of 38 days across the Santa Barbara and Ventura Counties. 280 structures were damaged and 1,063 structures were destroyed.

Residents were evacuated and significant smoke covered the area. A hazard shelter was set up with basic resources in Santa Paula for evacuees.

Simi Fire N/A 2003 108,204 acres burned over the course of 10 days in the Simi Valley. Significant smoke billowed over the valley.11 structures were damaged, 315 structures destroyed, 21 injuries. No property damages in Santa Paula.

Maria Fire FM-5302 November 1,
2019
9,999acres burned over 5 days. 4 structures were destroyed. Residents were evacuated and diverted by Santa Paula PD. Significant smoke lingering causing respiratory irritation.

Flash Flood N/A January 4,
2008
Rainfall totals between January 4th and 6th ranged from 5 to 11 inches in the foothills and mountains. The total amount of rainfall, combined with rainfall rates around 1 inch per hour, produced numerous reports of flooding as well as mud and debris flows.

SC River
Flood/SP Airport
DR-1585 2005 Flooding closed all ingress and egress from the city. Santa Paula airport was closed for several months due to flood damage to the runway--southern portion of the airport and runway was washed away by flood waters.

Flash Flood N/A November
30, 2002
An intense thunderstorm produced heavy rain and flash flooding near the community of Santa Paula. Law enforcement officials reported the intersection of Foothill Boulevard and Briggs Road as well as the intersection of Telegraph Road and Briggs Road were inundated with over 2 feet of water.

Wildfire N/A December
25, 2000
Gusty Santa Ana winds fueled a wildfire in the hills between the cities of Santa Paula and Somis. The fire, which burned over 360 acres, was started by downed power lines.

Northridge
Earthquake
DR-1008 1994 6.7 magnitude earthquake centered in Northridge. 57 fatalities reported during caused by earthquake with injuries over the thousands. Damages caused were over $20 billion in costs with double that in economic loss. Marked the costliest earthquake in U.S. history.

SC River Flood DR-253 1969 13 reported deaths. 5 bridge crossings destroyed. Property damage was estimated at $60 million.

St. Francis Dam
Flood
N/A 1928 Countywide, more than 530 people died; bridges, orchards, farms, homes all eradicated in flood’s path down the Santa Clara river valley to the Pacific Ocean.

8.6.2 Hazard Risk Ranking
Table 8-12 presents a local ranking of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property, and the economy. Mitigation actions primarily target hazards with high and medium rankings.
752
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 8-12
Table 8-12.Hazard Risk Ranking
Rank Hazard Risk Ranking Score Risk Category
1 Flooding 48 High
2 Dam Failure 36 High
3 Earthquake 32 Medium
4 Severe Storms 24 Medium
5 Severe Weather 24 Medium
6 Landslide 18 Medium
7 Wildfire 12 Low
8 Drought 9 Low

8.6.3 Jurisdiction-Specific Vulnerabilities
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. This section provides information on a few key vulnerabilities for this jurisdiction. Available jurisdiction-specific risk maps of the hazards are provided at the end of this annex.

Repetitive Loss Properties
Repetitive loss records are as follows:

Number of FEMA-identified Repetitive-Loss Properties: 3 Number of FEMA-identified Severe-Repetitive-Loss Properties: 0 Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 0
Other Noted Vulnerabilities
No jurisdiction-specific issues were identified by the results of the risk assessment, public involvement strategy, or other available resources.

8.7 STATUS OF PREVIOUS PLAN ACTIONS
Table 8-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared.

8.8 HAZARD MITIGATION ACTION PLAN
Table 8-14 lists the identified actions, which make up the hazard mitigation action plan for this jurisdiction. Table 8-15 identifies the priority for each action. Table 8-16 summarizes the mitigation actions by hazard of concern and mitigation type.
753

8. City of Santa Paula
8-13
Table 8-13.Status of Previous Plan Actions
Removed;
Carried Over to Plan
Update
Action Item Completed
No Longer
Feasible
Check if
Yes
Action # in
Update
OA 6—Develop a public outreach program that informs property owners located in the dam and levee failure inundation areas about voluntary flood insurance.

SP-4
Comment:Ongoing initiative, Public Works
OA 7—Develop a water conservation public outreach program to increase awareness about the drought, fines and penalties for overuse and solutions for conserving water.

SP-11
Comment:Ongoing initiative, Public Works
OA 11—Develop and implement plans to increase the building owner’s general knowledge of and appreciation for the value of seismic upgrading of the building’s structural and nonstructural elements.

SP-1
Comment:Ongoing initiative, Building & Safety / Public Works OA 14—Acquire, relocate, or elevate residential structures, in particular those that have been identified as RL properties, within the 100-year floodplain.

SP-1
Comment:Ongoing initiative, Public Works
Table 8-14.Hazard Mitigation Action Plan Matrix
BenefitsNew or
Existing AssetsObjectives Met Lead AgencySupport Agency Estimated
Cost Sources of FundingTimelinea
Action SP-1—Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.

Hazards Mitigated:Flooding, Dam Failure, Earthquake, Severe Storms, Severe Weather, Landslide, Wildfire Existing 2, 6, 9, 10, 11 City of Santa
Paula
None High FEMA HMA (BRIC, FMA,
PDM and HMGP)
Short-term
Action SP-2—Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions inthe community, including the East Area 1 development.

Hazards Mitigated:Flooding, Dam Failure, Earthquake, Severe Storms, Severe Weather, Landslide, Wildfire, Drought New & Existing1, 2, 3, 4, 5, 7, 8, 9,
10, 11, 12, 13, 14, 15,
17, 19
City of Santa
Paula
None Low Staff Time, General FundsOngoing
Action SP-3—Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.

Hazards Mitigated:Flooding, Dam Failure, Earthquake, Severe Storms, Severe Weather, Landslide, Wildfire, Drought New & Existing1, 2, 4, 6, 7, 8,9, 11,
12, 13, 14, 15
City of Santa
Paula
None Low Staff Time, General FundsShort-term
Action SP-4—Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements:

Enforce the flood damage prevention ordinance.

Participate in floodplain identification and mapping updates.

Provide public assistance/information on floodplain requirements and impacts.

Hazards Mitigated:Flooding
New & Existing 1, 2, 6, 7, 17 City of Santa
Paula
None Low Staff Time, General Funds Ongoing
754
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 8-14
BenefitsNew or
Existing AssetsObjectives Met Lead AgencySupport Agency Estimated
Cost Sources of FundingTimelinea
Action SP-5—Identify and pursue strategies to increase adaptive capacity to climate change including but not limited to the following:

Outlining floodplains and identifying areas under threat of liquefaction and subsidence that border the Santa Clara River Hazards Mitigated:Flooding, Severe Storms, Severe Weather, Wildfire, Drought New & Existing1, 2, 3, 4, 5, 6, 7, 8, 9,
10, 11, 12, 13, 14, 15,
16, 19
City of Santa
Paula
VCPWA-WP Low FEMA HMA (BRIC, FMA,
HMGP), Staff Time, General
Funds
Short-term
Action SP-6—Purchase generators for critical facilities and infrastructure that lack adequate backup power, including City Hall, Police Station, Community Center, City facilities yards, water pumping stations, sewer lift stations.

Hazards Mitigated:Dam Failure, Earthquake, Flooding, Landslide, Severe Storms, Severe Weather, Wildfire Existing 2, 19 City of Santa
Paula
High FEMA HMA (BRIC and
HMGP), Staff Time, General
Funds
Short-term
Action SP-7—Policies and procedures (HPS 1.1-4 & HPS 1.a-i) to reduce severity and damage caused by geologic hazards, including seismic upgrade of unreinforced masonry buildings as required by State regulations, annual review of building codes to ensure State codes are used in reviewing development proposals, establishing of geotechnical investigation standards and requirements to be followed by development applicants
Hazards Mitigated:Earthquake
New & Existing1, 2, 4, 6, 9, 10, 11,
12, 16
City of Santa
Paula
None Medium FEMA HMA (BRIC, HMGP),
Staff Time & General Funds
Ongoing
Action SP-8—Policies and procedures (HPS 2.1-6 & HPS 2.a-f) to address dam failure and storm water flood hazards, including but not limited to flood hazard mitigation planning that locates development areas where such risk can be mitigated to acceptable levels, locating development for any new public or emergency facilities outside flood hazard zones, participation in the National Flood Insurance Program and the Community Rating System to ensure the city is incentivized to reduce risk of damage from flooding and improve flood preparedness, support of flood control projects on the Santa Clara River, Santa Paula Creek, and other waterways, inter-agency cooperation with Army Corps of Engineers and VCPWA-WP
Hazards Mitigated:Flooding, Dam Failure
New & Existing1, 2, 4, 6, 9, 10, 11,
12, 16
City of Santa
Paula
VCPWA-WP Medium FEMA HMA (BRIC, FMA,
HMGP), Staff Time &
General Funds
Ongoing
Action SP-9—Policies and procedures (HPS 3.1-4 & HPS 3.a-i) to address risk of wildland fire including but not limited to locating development in areas where wildland fire risks can be mitigated to an acceptable level, locating new public and emergency facilities outside high fire hazard zones, enforcement of new State fire safe and defensible space regulations and standards (Public Resource Code Sec. 4290-4291 and Government Code Sec. 51182), ensuring adequate water supply for firefighting is available in all new development, consideration of a future fire station along the urban wildland interface along State Route 150, identification of effective methods to establish buffer zones separating residential development in foothills from chaparral and other native vegetation.

Hazards Mitigated:Wildfire
New & Existing1, 2, 4, 5,6, 9, 10, 11,
12, 16
City of Santa
Paula
Ventura CountyMedium FEMA HMA (BRIC, FMAP
and HMGP), Staff Time &
General Funds
Ongoing
Action SP-10—Maintain wildfire hazard fuel reduction program for areas that have been identified with overgrown or dead brush, trees and weeds to reduce the potential for tree-to-tree ignition. Ensure that a “maintenance now” component to provide continued fire resistance is part of the program. (Coordinates with VCFPD Action VFP-6) Hazards Mitigated:Wildfire
New & Existing2,4,5,6,8,10,11,
13, 14, 15, 18, 19
VCFPD City of Santa
Paula, CAL FIRE &
USDA
Medium FEMA HMA (BRIC, FMAP
and HMGP), Staff Time &
General Funds
Ongoing
755

8. City of Santa Paula
8-15
BenefitsNew or
Existing AssetsObjectives Met Lead AgencySupport Agency Estimated
Cost Sources of FundingTimelinea
Action SP-11—Continue developing thewater conservation public outreach program to increase awareness about the drought, fines and penalties for overuse and solutions for conserving water.

Hazards Mitigated:Drought
New & Existing 2, 12, 14, 16, 17 City of Santa
Paula
None Low Staff Time & General Funds Ongoing
Action SP-12—Determine feasibility of the City of Santa Paula joining the Community Rating System (CRS) program to enhance public safety, reduce flood damage to property and infrastructure, and reduce flood insurance rates in the community.

Hazards Mitigated:Flooding
New & Existing 1, 2, 19 City of Santa
Paula
None Low Staff Time & General FundsShort-term
Action SP-13—Water Recycling Facility Floodwall. Construct a Floodwall to protect the Water Recycling Facility, as required by FEMA.

The project will cost an estimated $550,000 with funds fully secured from the Sewer budget.

Hazards Mitigated:Flooding
Existing 2, 6, 11 City of Santa
Paula
None High FEMA HMA (BRIC, FMA,
HMGP), Staff Time &
General Funds
Short-term
Action SP-14—Water Main Replacement Program. Replace water mains deficient in capacity and not up to current seismic standards, as outlined in the City’s Potable Water System Master Plan.

Hazards Mitigated:Earthquake, Flooding, Severe Storms
Existing 2, 6, 9, 11, 19 City of Santa
Paula
None Low Sewer Budget, FEMA HMA
(BRIC, FMA, HMGP)
Ongoing
Action SP-15—Construct an Advanced Reverse Osmosis Treatment Facility. The project is part of a mandate by the Los Angeles Area Regional Water Quality Board to construct a recycled water delivery system to be completed no later than May 1, 2022. A Water Discharge Permit was issued to the city Feb. 8, 2019, covering a 10-year period with mandated milestones. The City completed infrastructure design, CEQA/Permitting, and additional Administrative/Financing in the amount of $1,490,000 in FY 2019/2020 for the proposed transmission line, as required by the LARWQCB in the Waste Discharge Requirements and Cease and Desist Order. Funding partially (43%) secured through Sewer budget.

Hazards Mitigated:Drought
New & Existing 2, 3, 8, 14 City of Santa
Paula
None Medium Sewer Budget, FEMA HMA
(BRIC, FMA, HMGP)
Short-term
Action SP-16—Well Rehabilitation Program. Rehabilitate groundwater wells [18, 11, 12, 13, 14] as recommended by the City’s Potable Water System Master Plan. The Decant Pump will require rebuilding or replacement of one well per year. Funding is fully secured through Water Department budget from FY 2021/2022 to FY 2025/2026.

Hazards Mitigated:Drought
Existing 2, 3, 14, 19 City of Santa
Paula
None Low Sewer Budget, FEMA HMA
(BRIC, FMA, HMGP)
Short-term
Action SP-17—Water Recycling Facility Capital Expenditures. Replacement of or plant improvements to critical equipment for the Water Recycling Facility. Past emergency events have identified a need to upgrade and raise elevation of the motor control center and improve water pump and wastewater processing operation sustainability during emergency events and power outage. Funding is fully secured through Sewer budget.

Hazards Mitigated:Flooding, Drought
Existing 2, 3, 11, 14 City of Santa
Paula
None Low Sewer Budget, FEMA HMA
(BRIC, FMA, HMGP)
Ongoing
756
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 8-16
BenefitsNew or
Existing AssetsObjectives Met Lead AgencySupport Agency Estimated
Cost Sources of FundingTimelinea
Action SP-18—FEMA Floodplain Restudy. Develop alternative floodplain study with associated hydrologic and hydraulic analysis to address deficiencies in current FEMA study in key areas of the City. This project will take 6 months to complete and will provide specific detail that builds upon the more general countywide study that was performed by Ventura County.

Hazards Mitigated:Flooding
New & Existing 1, 8, 19 City of Santa
Paula
None High FEMA HMA (BRIC, FMA,
HMGP), Staff Time &
General Funds
Short-term
Action SP-19—Foothill/Cameron Drainage Improvements. Construct drainage and retaining wall improvements to address safety issues at intersection. Construct: approximately 75’ of a 6’ maximum height retaining wall to match existing adjacent wall along Foothill Dr; debris inlet and associated piping to address drainage and debris flows from steep adjacent agricultural property. Remove existing concrete barrier from roadway and restore two-way vehicular travel. This area has been identified as a critically affected area during flooding events.

Hazards Mitigated:Flooding
Existing 6, 11, 14, 18 City of Santa
Paula
None Low FEMA HMA (BRIC, FMA,
HMGP), Staff Time &
General Funds
Short-term
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date
Acronyms used here are defined at the beginning of this volume.

Table 8-15.Mitigation Action Priority
Action #
# of
Objectives
Met BenefitsCosts
Do Benefits
Equal or
Exceed Cost?
Is Project
Grant-
Eligible?
Can Project Be Funded
Under Existing
Programs/ Budgets?
Implementation
Prioritya
Grant
Pursuit
Prioritya
1 5 High High Yes Yes No Medium High
2 16 Medium Low Yes No Yes High Low
3 12 Low Low Yes No Yes High Low
4 5 Medium Low Yes No Yes High Low
5 17 Medium Low Yes Yes Yes High Medium
6 2 High High Yes Yes No Medium High
7 9 High Medium Yes Yes Yes High High
8 9 High Medium Yes Yes Yes High High
9 10 High Medium Yes Yes Yes High High
10 12 High Medium Yes Yes Yes High High
11 5 Low Low Yes No Yes High Low
12 3 Medium Low Yes No Yes High Low
13 3 High High Yes Yes No Medium High
14 5 Medium Low Yes Yes Yes High Medium
15 4 High Medium Yes Yes No Medium High
16 4 Medium Low Yes Yes Yes High Medium
17 4 Medium Low Yes Yes Yes High Medium
18 3 Medium High Yes Yes No Medium High
19 4 High Low Yes Yes No Medium High
a. See the introduction to this volume for explanation of priorities. 757

8. City of Santa Paula
8-17
Table 8-16.Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention
Property
Protection
Public
Education &
Awareness
Natural
Resource
Protection
Emergency
Services
Structural
Projects
Climate
Resilience
Community
Capacity
Buildingb
High-Risk Hazards
Flooding SP-2, 4, 8 SP-1, 8, 17 SP-6 SP-8, 13, 14,
19 SP-5, 17 SP-2, 3, 4, 8,
12, 18
Dam Failure SP-2, 8 SP-1, 8 SP-6 SP-8 SP-2, 3, 8
Medium-Risk Hazards
Earthquake SP-2, 7 SP-1, 7 SP-6 SP-14 SP-2, 3, 7
Severe Storms SP-2 SP-1 SP-6 SP-14 SP-5 SP-2, 3
Severe Weather SP-2 SP-1 SP-6 SP-5 SP-2, 3
Landslide SP-2 SP-1 SP-6 SP-2, 3
Low-Risk Hazards
Wildfire SP-2, 9 SP-1 SP-9, 10 SP-6 SP-5 SP-2, 3, 9
Drought SP-2 SP-11 SP-15 SP-5, 15, 16,
17 SP-2, 3
a. See the introduction to this volume for explanation of mitigation types. b. Note that the jurisdiction did not identify a need for expansion of financial capabilities, based on existing capabilities. The intent of this hazard mitigation plan is to expand the financial capability of the jurisdiction.

8.9 PUBLIC OUTREACH
Table 8-17 lists public outreach activities for this jurisdiction.

Table 8-17.Local Public Outreach
Local Outreach Activity Date
Number of People
Involved
Seismic Upgrade Handouts/Guides, Building & Safety Ongoing Citywide Water Conservation Handouts/Guides, Building & Safety Ongoing Citywide Participant, CaliforniaState ‘Save Our Water’Program Ongoing Citywide

8.10 INFORMATION SOURCES USED FOR THIS ANNEX
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex.

City of Santa Paula Municipal Code—The municipal code was reviewed for the full capability assessment and for identifying opportunities for action plan integration.

City of Santa Paula Flood Damage Prevention Ordinance—The flood damage prevention ordinance was reviewed for compliance with the National Flood Insurance Program.

City of Santa Paula 2040 General Plan—The 2040 General Plan (focusing on Section 5, Hazards & Public Safety Element) was reviewed for opportunities for action plan integration. 2040-General-Plan-Section-5---Hazards-and-Public-Safety-Element (spcity.org) 758
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 8-18
City of Santa Paula Fiscal Year 2021/2022 & 2022/2023 Proposed Budget—The budget was reviewed for capability assessment and for identifying opportunities for action plan integration.

The following outside resources and references were reviewed:

Hazard Mitigation Plan Annex Development Toolkit—The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan.

Census Bureau, Santa PaulaU.S. Census Bureau QuickFacts: United States CAL FIRE IncidentsWelcome to Stats & Events (ca.gov)
Department of ConservationNorthridge Earthquake, January 17, 1994 (ca.gov) Ventura County Public WorksSanta Clara River, Ventura County Public Works Agency (vcpublicworks.org)
Ventura County Flood InfoVC Flood History (vcfloodinfo.com) Ventura County Community Air Protection AB 617, 2020 Annual ReportVentura County Air Pollution Control District Community Air Protection (AB 617) Tetra Tech Loss Matrix—risk assessment spreadsheet provided by consultant. 759
Santa Paula
150
126
126
Food, Water, Shelter
Health and Medical
Safety and Security
Major Roads
Selected City
Incorporated Cities
County Boundary
Data Sources: Ventura Co., VCFD,
Casitas MWD, Calleguas MWD,
City of Camarillo, CA Energy
Commission, Cal Trans, EPA,
HIFLD, Esri
Santa Paula
Critical Facilities (1 of 2)
0 0.45 0.90.225 Miles
760
Santa Paula
150
126
126
Communications
Energy
Hazardous Material
Transportation
Major Roads
Selected City
Incorporated Cities
County Boundary
Data Sources: Ventura Co., VCFD,
Casitas MWD, Calleguas MWD,
City of Camarillo, CA Energy
Commission, Cal Trans, EPA,
HIFLD, Esri
Santa Paula
Critical Facilities (1 of 2)
0 0.45 0.90.225 Miles
761
Santa Paula
150
126
126
Data Sources: Ventura Co.,
CA DWR, Esri
Santa Paula
Dam Failure
Inundation Areas
0 0.45 0.90.225 Miles
Combined Inundation
Areas
Major Roads
Selected City
Incorporated Cities
County Boundary
762
Santa Paula
150
126
126
Data Sources: Ventura Co.,
CGS, Esri
Santa Paula
NEHRP Soil Class
0 0.45 0.90.225 Miles
C (Dense soil/soft rock)
D (Stiff soil)
Major Roads
Selected City
Incorporated Cities
County Boundary
763
Santa Paula
150
126
126
Data Sources: Ventura Co.,
Esri
Santa Paula
Liquefaction Susceptibility
0 0.45 0.90.225 Miles
Liquefaction zone
Major Roads
Selected City
Incorporated Cities
County Boundary
764
Santa Paula
150
126
126
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Santa Paula
100-Year Probabilistic
Earthquake Scenario
0 0.45 0.90.225 Miles
Mercalli Intensity Scale
VII (Very Strong/Moderate)
Major Roads
Selected City
Incorporated Cities
County Boundary
765
Santa Paula
150
126
126
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Santa Paula
Oak Ridge M7.16
Earthquake Scenario
0 0.45 0.90.225 Miles
Mercalli Intensity Scale
VIII (Severe/Moderate-Heavy)
Major Roads
Selected City
Incorporated Cities
County Boundary
766
Santa Paula
150
126
126
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Santa Paula
Pitas Point M7.12
Earthquake Scenario
0 0.45 0.90.225 Miles
Mercalli Intensity Scale
VIII (Severe/Moderate-Heavy)
Major Roads
Selected City
Incorporated Cities
County Boundary
767
Santa Paula
150
126
126
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Santa Paula
San Cayetano M7.16
Earthquake Scenario
0 0.45 0.90.225 Miles
Mercalli Intensity Scale
VII (Very Strong/Moderate)
VIII (Severe/Moderate-Heavy)
Major Roads
Selected City
Incorporated Cities
County Boundary
768
Santa Paula
150
126
126
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Santa Paula
S. San Andreas M8.03
Earthquake Scenario
0 0.45 0.90.225 Miles
Mercalli Intensity Scale
VI (Strong/Light)
Major Roads
Selected City
Incorporated Cities
County Boundary
769
Santa Paula
150
126
126
Data Sources: Ventura Co.,
FEMA, Esri
Santa Paula
FEMA Flood Hazard Areas
0 0.45 0.90.225 Miles
1% Annual Chance
Flood (100-Year)

0.2% Annual Chance
Flood (500-Year)
Major Roads
Selected City
Incorporated Cities
County Boundary
770
Santa Paula
150
126
126
Data Sources: Ventura Co.,
CGS, Esri
Santa Paula
Susceptibility to
Deep-Seated Landslides
0 0.45 0.90.225 Miles
Low
Moderate
High
Very High
Major Roads
Selected City
Incorporated Cities
County Boundary
771
Santa Paula
150
126
126
Data Sources: Ventura Co.,
CAL FIRE, Esri
Santa Paula
Wildfire Hazard
Severity Zones
0 0.45 0.90.225 Miles
Moderate
High
Very High
Major Roads
Selected City
Incorporated Cities
County Boundary
772
773
9-1

9. CITY OF SIMI VALLEY

9.1 LOCAL HAZARD MITIGATION PLANNING TEAM
Primary Point of Contact Alternate Point of Contact
Eileen Connors, Emergency Services Manager
3901 Alamo Street
Simi Valley, CA 93063
Telephone: 805-583-6982
e-mail Address: [email protected]
Sean Gibson, Deputy ES Director/City
Planner
2929 Tapo Canyon Rd.

Simi Valley, CA 93063
Telephone: 805-583-6383
email Address: [email protected]
This annex was developed by the local hazard mitigation planning team, whose members are listed in Table 9-1.

Table 9-1.Local Mitigation Planning Team Members
Name Title
Chris Oberender Deputy Public Works Director
Brent Siemer Deputy Public Works Director
Samantha Argabrite Deputy City Manager, City Manager’s Office Sean Gibson Deputy ES Director/City Planner, Planning
Eileen Connors Emergency Services Manager
Alison Phagan Deputy Director, Administrative Services
Marvin Lopez Administrative Services
Jeff Pike Ventura County Fire Dept.

9.2 JURISDICTION PROFILE

9.2.1 Location and Features
The City of Simi Valley is in southeast Ventura County.

The current boundaries generally extend from the Santa Susana Mountains in the north to the Simi Hills in the south and east to the San Fernando Valley, encompassing an area of forty-two square miles.

Located just minutes from Los Angeles, Simi Valley offers a vibrant city full of cultural diversity, historical landmarks and beautiful rolling hills with the charm of a small town close to Southern California’s most famous attractions. Simi Valley is Southern California’s best kept secret, the perfect choice for a getaway, meeting, or wedding. The City is home to a variety of business industries, 774
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 9-2
including Aerospace, Commercial Aircraft, and Defense Manufacturing, software and technology, warehouse and distribution and auto and transportation.

9.2.2 History
The City of Simi Valley was incorporated in 1969 under the general laws of the State of California. It is believed that the name of the Chumash Indian Village “Shimiji” is the origin of the City’s name. Ta’apu is the origin of the names of Tapo Street and Tapo Canyon. The official City tree is the Coast Live Oak, whose acorns were used by the Chumash Indians for food. The official City flower is the California Wild Rose, from which the Chumash Indians ate vitamin-rich rosehips. In 1795, San José de Nuestra Señora de Altagracia y Simí was granted to Santiago Pico, one of 240 colonists from Mexico, by Spanish Governor Diego de Borica. This land grant, approximately 113,000 acres in size, was one of the largest ever made.

9.2.3 Governing Body Format
The City of Simi Valley operates under a General-Law/council-manager form of government.

The City Council of Simi Valley assumes responsibility for the adoption of this plan; the Emergency Services department will oversee its implementation.

9.3 CURRENT TRENDS

9.3.1 Population
According to the California Department of Finance, the population of the City of Simi Valley as of January 2020, was 125,115. Since 2010, the population has grown at an average annual rate of 0.06 percent.

9.3.2 Development
Early development in Simi Valley was agricultural in nature with a variety of crops and cattle grazing on much of the valley floor. As the City grew, development on the valley floor was characterized by a continuous pattern of suburban construction dominated by one and two-story buildings, schools, housing, shopping centers, community facilities, and places of employment, interspersed with parks and open spaces. As growth continued, available vacant land on the valley floor became more limited, and outward expansion of residential development into nearby hillsides occurred. Specific plans have been prepared for several larger-scale projects, in order to preserve the hillside areas as an important natural and visual resource and to provide for the orderly growth of these areas. Examples include the Wood Ranch Specific Plan, Runkle Canyon Specific Plan, and the Whiteface Specific Plan.

Commercial development has also occurred in the community, the most recent being the region-serving Simi Valley Town Center.

The City has developed a region-serving shopping center, the Simi Valley Town Center, and a large residential development in the north-central part of the City called the Big Sky Ranch. Both projects incorporated significant hazard mitigation in the development process; they represent a major success story in the use of hazard mitigation policies to build a safe community. The North Simi Detention basin 775

9. City of Simi Valley
9-3
was built to mitigate flooding in both developments, and in the process, removed downstream homes from the FEMA FIRM areas. The strict enforcement of building codes in the developments incorporated current seismic, fire, and flooding mitigation standards.

Simi Valley’s land use pattern reflects the City’s identity as a residential community with significant protected open space and parklands. Residential development represents the predominant land use in the City, making up more than 71 percent of its total land area. Parks and other public and semi-public uses such as schools, cemeteries, a regional landfill, and transportation rights-of-way make up just over 20 percent of the land uses. Industrial and commercial are the remaining land uses in the City, occupying approximately 5 percent and 3 percent, respectively, and represent the smallest component of the City’s overall land use pattern.

Table 9-2 summarizes development trends in the period since the preparation of the previous hazard mitigation plan, as well as expected future development trends.

Table 9-2.Recent and Expected Future Development Trends Criterion Response
Has your jurisdiction annexed any land since
the preparation of the previous hazard
mitigation plan?
No
If yes, give the estimated area annexed
and estimated number of parcels or
structures.

N/A
Is your jurisdiction expected to annex any
areas during the performance period of this
plan?
Yes
If yes, describe land areas and dominant
uses.

Approximately486 acres of land spread across 447 parcels located on the north west of the City the north east of the City and around Sinaloa Lake. The uses in these areas include vacant and agricultural land as well as land improved with single family residences.

If yes, who currently has permitting
authority over these areas?
Ventura County
Are any areas targeted for development or
major redevelopment in the next five years?
Yes
If yes, briefly describe, including whether
any of the areas are in known hazard risk
areas
The Lost Canyons Residential Development consisting of 364 single-family dwellings located on the northern outskirts of the City Limits is located in a Very High Fire Hazard Severity Zone and pockets of landslide and liquefaction hazards. These areas have been studied in the project’s Environmental Impact Report and Mitigation Measures are in place to protect the public safety.

The 210-unit North Canyons Ranch Project located adjacent to the northern City Boundary is located in a Very High Fire Hazard Severity Zone and small areas of landslide and liquefaction hazard areas. The project’s EIR will address safety issues and mitigation measures to address these hazards
How many permits for new construction were
issued in your jurisdiction since the
preparation of the previous hazard mitigation
plan?
2016 2017 2018 2019 2020
Single Family 101 87 91 51 53
Multi-Family 35 8 29 27 3
Other (commercial, mixed use, etc.)16 5 6 5 3
Total 152 100 126 83 59
776
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 9-4
Criterion Response
Provide the number of new-construction
permits for each hazard area or provide a
qualitative description of where development
has occurred.

Special Flood Hazard Areas: 0 (New development is prohibited in the SFHA) Landslide: *
High Liquefaction Areas: *
Tsunami Inundation Area: 0
Wildfire Risk Areas: *
*The City of Simi Valley includes substantial areas of earthquake-induced landscape and liquefaction areas, and wildfire-risk areas. Pursuant to the General Plan, Building Codes and geotechnical standards have been adopted to provide protection for new and renovated structures in these hazard areas. For Special Flood Hazard Areas, all new construction, substantial repair/improvements, and grading are prohibited. The City does not have any Tsunami Inundation Areas.

Describe the level of buildout in the
jurisdiction, based on your jurisdiction’s
buildable lands inventory. If no such
inventory exists, provide a qualitative
description.

The City is virtually built out, with little undeveloped land remaining. The hillside open space areas surrounding the community are expected to remain substantially unchanged as development in these areas is regulated through the City’s Hillside Performance Standards, which are designed to preserve the natural resources surrounding the community.

9.4 CAPABILITY ASSESSMENT
This section describes an assessment of existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning.

Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table in this annex identifies these as community capacity building mitigation actions. The findings of the assessment are presented as follows:

An assessment of planning and regulatory capabilities is presented in Table 9-3.

Development and permitting capabilities are presented in Table 9-4.

An assessment of fiscal capabilities is presented in Table 9-5.

An assessment of administrative and technical capabilities is presented in Table 9-6.

An assessment of education and outreach capabilities is presented in Table 9-7.

Information on National Flood Insurance Program (NFIP) compliance is presented in Table 9-8.

Classifications under various community mitigation programs are presented in Table 9-9.

The community’s adaptive capacity for the impacts of climate change is presented in Table 9-10.
777

9. City of Simi Valley
9-5
Table 9-3.Planning and Regulatory Capability
Local
Authority
Other Jurisdiction
Authority
State
Mandated
Integration
Opportunity?
Codes, Ordinances, & Requirements
Building Code Yes No Yes Yes
Comment:Simi Valley Municipal Code, Title 8, Simi Valley Building Code; California Building Codes, Title 24 of the California Code of Regulations
Zoning Code Yes No Portions Yes
Comment:Simi Valley Municipal Code, Title 9, Planning and Zoning Subdivisions Yes No Yes Yes
Comment:Simi Valley Municipal Code, Title 9, Planning and Zoning/ State Subdivision Map Act (Govt. Code Sec. 66410- 66499.58), Title 7, Chapter 5 Flood Damage Prevention
Stormwater Management Yes Yes Yes Yes
Comment:Simi Valley Municipal Code, Title 7, Chapter 5 Flood Damage Prevention, National Flood Insurance Program (NFIP), NFIP Community Rating System, California State Water Quality Control Board MS4 Permit Post-Disaster Recovery Yes No Yes Yes
Comment:Mandated by CalOES and FEMA for funding.

Real Estate Disclosure Yes No Yes Yes
Comment:SFHA & All-Hazards declaration (State, City)
Growth Management Yes No Yes Yes
Comment:Simi Valley General Plan
Site Plan Review Yes Yes No Yes
Comment:(Rancho Simi Recreation and Park District, VCFire, VCPWA-WP)Simi Valley Municipal Code, Title 9, Planning and Zoning
Environmental Protection Yes Yes Yes Yes
Comment:CEQA
Flood Damage Prevention Yes Yes No Yes
Comment:Simi Valley Municipal Code, Title 7, Chapter 5 Flood Damage Prevention, National Flood Insurance Program (NFIP), NFIP Community Rating System SFHA (FEMA, City)
Emergency Management Yes No Yes Yes
Comment:Mandated by CalOES and FEMA for funding.

Climate Change Yes Yes Yes Yes
Comment:CEQA
Planning Documents
General Plan Yes No Yes Yes
Is the plan compliant with Assembly Bill 2140?Yes
Comment: Once Safety Element is updated in October 2021, this will comply with AB2140.

Capital Improvement Plan Yes No No Yes
How often is the plan updated? Every Year
Comment: City of Simi Valley Proposed Five Year Capital Improvement Plan Disaster Debris Management Plan Yes No No Yes
Comment: Must meet requirements for CalOES and FEMA funding Floodplain or Watershed Plan No No No Yes
Comment: Both plans are in currently in conceptual form (FEMA, VCPWA-WP, City) Stormwater Plan Yes No No No
Comment:2016 Master Plan of Drainage requires update (City) Urban Water Management Plan Yes No Yes No
Comment:2020 Plan recently adopted
778
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 9-6
Local
Authority
Other Jurisdiction
Authority
State
Mandated
Integration
Opportunity?
Habitat Conservation Plan Yes No Yes Yes
Comment:General Plan/CEQA addresses portions of this
Economic Development Plan Yes No No Yes
Comment:City of Simi Valley Economic Development Plan
Shoreline Management Plan No No No No
Comment: The City doesn’t have shoreline.

Community Wildfire Protection Plan Yes No No Yes
Comment:VCFPD’s Ready, Set, Go! Wildfire Action Plan; Ventura County Fire Code Section W106-Fire Protection, Fuel Modification and Vegetation Management Plans and FHRP
Forest Management Plan No No No No
Comment: The City doesn’t have forests.

Climate Action Plan Yes No Yes Yes
Comment: General Plan/CEQA addresses portions of this.

Comprehensive Emergency Management Plan Yes No Yes Yes
Comment:Updating in 2022.Required by CalOES and FEMA for funding.

Threat & Hazard Identification & Risk Assessment (THIRA)Yes No No Yes Comment:The City relies on Ventura County’s THIRA.

Post-Disaster Recovery Plan Yes No Yes Yes
Comment:Opportunity to expand it in 2022 EOP update. Required by CalOES and FEMA for funding.

Continuity of Operations Plan Yes No Yes Yes
Comment:Opportunity to expand it in 2022 EOP update. Required by CalOES and FEMA for funding.

Public Health Plan Yes Yes Yes Yes
Comment:Opportunity to expand it in 2022 EOP update
Table 9-4.Development and Permitting Capability
Criterion Response
Does your jurisdiction issue development permits? Yes
If no, who does? If yes, which department?Public Works issues Flood Area Development Permits for development within the SFHA. Environmental Services.

Does your jurisdiction have the ability to track permits by hazard area? No Does your jurisdiction have a buildable lands inventory? Yes Table 9-5.Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants Yes
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes Yes
User Fees for Water, Sewer, Gas or Electric Service Yes If yes, specify: Water and Sewer Fees
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds Yes
Incur Debt through Private Activity Bonds Yes
Withhold Public Expenditures in Hazard-Prone Areas Yes
779

9. City of Simi Valley
9-7
Financial Resource Accessible or Eligible to Use?
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers Yes Other Yes(Traffic Mitigation fees)
Table 9-6.Administrative and Technical Capability
Staff/Personnel Resource Available?
Plannersor engineerswith knowledge of land development and land management practices Yes If Yes, Department /Position:Public Works/Deputy Director (Development Services) Public Works/Senior Engineer (Development Services)
Environmental Services/Planning Division
Engineers or professionals trained in building or infrastructure construction practices Yes If Yes, Department /Position:Public Works/Deputy Director (Development Services) Public Works/Senior Engineer (Development Services)
Planners or engineers with an understanding of natural hazards Yes If Yes, Department /Position:Public Works/Deputy Director (Development Services) Staff with training in benefit-cost analysis Yes
If Yes, Department /Position:Public Works/Deputy Director (Development Services) Surveyors Yes
If Yes, Department /Position:The City contracts surveying services with outside consultants.

Personnel skilled or trained in GISapplications Yes
If Yes, Department /Position:Public Works/GIS Coordinator, Police Dept/Emergency Services Manager Scientist familiar with natural hazards in local area Yes If Yes, Department /Position:Public Works/Deputy Director (Development Services) Emergency manager Yes
If Yes, Department /Position:Police Dept/Emergency Services Manager Grant writers Yes
If Yes, Department /Position:Police Dept/Emergency Services Manager. Administrative Servicesalsocontracts these services through an outside consultant
Table 9-7.Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? Yes If yes, briefly describe:The City’s 2015 Multi-Hazard Mitigation Plan is posted.

Do you use social media for hazard mitigation education and outreach? Yes If yes, briefly describe:The City and SVPD use Twitter, Next Door and other outlets.

Do you have any citizen boards or commissions that address issues related to hazard mitigation?Yes If yes, briefly describe:NFIP CRS Program for Public InformationProgram andCommittee; CERT and Disaster Service Worker volunteer teams.

Do you have any other programs in place that could be used to communicate hazard-related information? Yes If yes, briefly describe:NFIP CRS Program for Public Information Program and Committee; AM530 Radio; Portable digital signs and SVTV cable channel.

Do you have any established warning systems for hazard events? Yes If yes, briefly describe:The County of Ventura uses VC Alert and we encourage residents to sign up. 780
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 9-8
Table 9-8.National Flood Insurance Program Compliance
Criterion Response
What local department is responsible for floodplain management? Public Works Who is your floodplain administrator? (department/position) Public Works/Public Works Director Are any certified floodplain managers on staff in your jurisdiction? Yes What is the date thatyour flood damage prevention ordinancewas last amended? February 27, 2017 Does your floodplain management program meet or exceed minimum requirements?Exceeds If exceeds, in what ways?All development within the SFHA, including fill, is prohibited. Additional higher regulatory design and construction standards have been codified in the SVMC.

When was the most recent Community Assistance Visit or Community Assistance Contact?
December 3, 2021
Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed?
No
Are any RiskMAP projects currently underway in your jurisdiction? No Do your flood hazard maps adequately address the flood risk within your jurisdiction?No If no, state why.The Flood Insurance Study and FIRMs do not accurately represent true flood risk and are overtly conservative. The City is working with FEMA Region 9 to identify funding for either a RiskMap to correct these mapping issues or a Flood Hazard Study to support a subsequent City sponsored mapping change application to FEMA.

Does your floodplain management staff need any assistance or training to support its floodplain management program?
Yes
If so, what type of assistance/training is needed?City staff needs training in grant management (NDGrants) and the Mapping Information Platform (MIP) in order to pursue FEMA grant funding for mapping projects.

Does your jurisdiction participate in the Community Rating System (CRS)? Yes If yes, is your jurisdiction interested in improving its CRS Classification?Yes How many flood insurance policies are in force in your jurisdiction? 1,624 What is the insurance in force?$425,325,500
What is the premium in force?$1,337,947
How many total loss claims have been filed in your jurisdiction? 82 What were the total payments for losses?$116,840
a. According to FEMA statistics as of March 31, 2021
Table 9-9.Community Classifications
Participating? Classification Date Classified
FIPS Code Yes 0611172016 N/A
DUNS # Yes 076238211 N/A
Community Rating System Yes 5 10/01/19
Building Code Effectiveness Grading Schedule Yes 2 10/2/17 Public Protection Yes 03/3X 12/21/2018
Storm Ready No N/A N/A
Firewise No N/A N/A
Tsunami Ready N/A N/A N/A
781

9. City of Simi Valley
9-9
Table 9-10.Adaptive Capacity for Climate Change
Criterion
Jurisdiction
Rating
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Medium Comment:The General Plan Safety & Noise Chapter update was adopted on October 25, 2021, and includes new Emergency Preparedness Goals and Policies to respond to climate change.

Jurisdiction-level monitoring of climate change impacts High Comment:City of Simi Valley Climate Action Plan
Technical resources to assess proposed strategies for feasibility and externalities High Comment:City of Simi Valley Greenhouse Gas Inventory Policy, Climate Action Plan; City of Sim Valley Green Community Action Plan Jurisdiction-level capacity for development of greenhouse gas emissions inventory High Comment:City of Simi Valley Climate Action Plan
Capital planning and land use decisions informed by potential climate impacts High Comment:Appendix A of General Plan, Policies Addressing Climate Change Participation in regional groups addressing climate risks Medium Comment:Ventura County Fire Protection District, Ventura County Health Department, Ventura County OES Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes High Comment:General Plan wasadopted on October 25, 2021
Identified strategies for greenhouse gas mitigation efforts High Comment:City of Simi Valley Climate Action Plan
Identified strategies for adaptation to impacts High
Comment:City of Simi Valley Climate Action Plan
Champions for climate action in local government departments High Comment:Planning, Public Works and City Manager’sOffice staff through the implementation of the General Plan, Climate Action Plan and efforts to enhance resiliency of City Buildings.

Political support for implementing climate change adaptation strategies High Comment:The City Council voted to join the Clean Power Alliance, a Community Choice Aggregator, focused On providing clean energy to communities in Southern California.

Financial resources devoted to climate change adaptation High Comment:The City has undertaken a multi-milliondollar project at the Wastewater Treatment Plant to Enhance the City’s resiliency; has invested in solar, battery back-up systems for City facilities, LED lighting, and similar projects.

Local authority over sectors likely to be negative impacted High Comment:Businesses must abide by the California Green Building Code, the City’s General Plan. However, Many sectors are regulated by the State and Federal government.

Public Capacity
Local residents’ knowledge of and understanding of climate risk Medium Comment:Staff does consistent outreach to the community regarding the need for water conservation due to Drought, preparation for PSPS events due to severe weather and possible Wildfire, but there is opportunity for improvement.

Local residents’ support of adaptation efforts Medium
Comment:Some Simi Valley residents have adopted the use of solar panels to be less reliant on the grid but there are other opportunities that can be explored.

Local residents’ capacity to adapt to climate impacts Medium Comment:Residents have been installing solar panels and buying electric vehicles, but there are other opportunities that can be explored.
782
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 9-10
Criterion
Jurisdiction
Rating
Local economy current capacity to adapt to climate impacts Medium Comment:The City has a diversified economy, which can adapt to climate impacts, but much of the workforce needs training to stay current.

Local ecosystems capacity to adapt to climate impacts Low Comment:The City does not have the specialized staff and funding to revamp the ecosystem to be more resilient. a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.

9.5 INTEGRATION REVIEW
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as general planning and capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future.

Resources listed at the end of this annex were used to provide information on integration. The progress reporting process described in Volume 1 of the hazard mitigation plan will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration.

9.5.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs:
2016 Master Plan of Drainage—SVMC 7-5.605, Flood Damage Prevention, Standards for subdivisions and other proposed development.

NFIP CRS Program for Public Information—NFIP CRS PPI Plan adopted by the City Council.

Emergency Operations Plan—The EOP explains how the City will plan for, respond to and recover from hazards and disasters. Disaster Debris Management is included in the EOP.

Simi Valley General Plan—Safety Element addresses integration of hazard mitigation into the overall development of the City’s and identifies policies and implantation programs.

Simi Valley Municipal Code, Title 9, Planning and Zoning—Planning and Building Code integrate safe building and land use practices to mitigate risk.

California Environmental Quality Act—Requires the assessment of wildlife risk, climate change impacts and environmental impacts on land development projects in the City of Simi Valley.

9.5.2 Opportunities for Future Integration
The capability assessment in this annex indicates opportunities to integrate this mitigation plan with other jurisdictional planning/regulatory capabilities. Capabilities were identified as integration opportunities if they can support or enhance the actions identified in this plan or be supported or enhanced by components of this plan. The capability assessment identified the following plans and 783

9. City of Simi Valley
9-11
programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future:

Post-Disaster Recovery Plan—The City can expand the 2015 HMP recovery plan into a more detailed version.

Continuity of Operations Plan—The City can expand the current recovery plan to build on the goals and objectives identified in the hazard mitigation plan.

Public Health Plan—The City can expand the current recovery plan to build on the goals and objectives identified in the hazard mitigation plan.

Economic Development Plan—The City can look for mitigation opportunities in private sector partnerships.

Home Rehabilitation Program—The City can investigate expanding the program to incorporate clean energy technology.

Taking action to integrate each of these programs with the hazard mitigation plan was considered as a mitigation action to include in the action plan in this annex.

9.6 RISK ASSESSMENT

9.6.1 Jurisdiction-Specific Natural Hazard Event History Table 9-11 lists past occurrences of natural hazards for which specific damage was recorded in this jurisdiction Other hazard events that broadly affected the entire planning area, including this jurisdiction, are listed in the risk assessments in Volume 1 of this hazard mitigation plan.

Table 9-11.Past Natural Hazard Events
Type of Event
FEMA
Disaster # Date Damage Assessment
COVID-19 Pandemic DR-4482 01/20/20–contin
uing
N/A
Severe Weather N/A 02/28/2021 Strong and gusty Santa Ana winds impacted the coastal valleys of Ventura County. Some peak north to northeast wind reports from the local mesonet included east Simi Valley (gust 61 mph).

Wildfire (Easy Fire) FM-5298 10/30-11/2/2019The three-day fire burned 1,806 acres in west Simi Valley and threatened the Reagan Presidential Library.

Wildfire (Woolsey Fire)DR-4407 11/8-25/2018This fire was active for 56 days in Ventura and LA counties.It burned over 96,000 acres south of Simi Valley and is the eighth most destructive fire in California history.

Wildfire (Peak Fire) N/A 11/12/2018 This one-day fire burned 186 acres east of Simi Valley off Hwy 118 and Rocky Peak Road.

Wildfire, Flooding,
Landslide
DR-4353 12/4/2017-
1/31/2018
Wildfire, Mudflows and Debris Flows
784
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 9-12
Type of Event
FEMA
Disaster # Date Damage Assessment
Wildfire (Thomas Fire) FM-5224 12/4/2017 Rancho Simi Recreation and Park District$4M, SVPD $35K in SVPD overtime. This fire was active for 38 days in Ventura and Santa Barbara counties. It was started by power lines and burned over 280,000 acres and destroyed 1,063 structures. Rye Fire burned 12/5- 12/2017 in Santa Clarita but didn’t reach Simi Valley.

Wildfire (Kuehner Fire) N/A 7/1/2016 This one-day fire burned 45 acres off Hwy 118 at Rocky Peak Road, northeast of Simi Valley.

Wildfire (Rustic Fire) N/A 8/16/2015 This one-day fire threatened 500 homes in southwest Simi Valley before being extinguished. Residents were advised to prepare to evacuate their animals, especially livestock, but no evacuation orders were issued.

Flooding N/A 12/12/2014 Heavy rain produced flash flooding and mud and debris flows in the community of Simi Valley. Law enforcement reported mud flows across Hwy 118 at Kuehner Drive.

Wildfire (Springs Fire) FM-5024 5/2-11/2013Impacted Ventura County.

Severe Storm and FloodingN/A 1/18-22/2010Heavy rain, gusty winds, and heavy snow were witnessed in Ventura County. Rainfall totals ranged from 4-8 inches over coastal areas to 8-16 inches in the foothills and mountains. Flash flood watches were issued in areas of Ventura County that were damaged by wildfires in 2008.

Wildfire, Flooding,
Landslide
DR-1731 10/21/2007-
3/31/2008
Minor flooding of streets; First Street bridge flooded, which is common with heavy rain. Los Angeles Ave/Madera Road intersection flooded. A blocked storm drain near Santa Susana Park at Katherine Road resulted in the flooding of a few homes.

Wildfire (Sesnon Fire) N/A 10/13-18/2008EOC activated 10/13-15/2008. Fire active from 10/13 – 18/2008.

Severe Weather DR-1689 1/11-17/2007 Freeze.

Wildfire (Day Fire) FM-2677 9/25-30/2006Burned 162,000 acres over 28 days north of Simi Valley.

Wildfire (School Fire) FM-2586 11/18-23/2005Burned almost 4,000 acres over four days near the City of Ventura.

Wildfire (Topanga Fire)FM-25839/28-10/10/2005This Chatsworth-area fire burned along the LA/Ventura counties border for seven days, destroying over 24,000 acres.

Flooding DR-1585 2/16-23/2005Madera Rd/Los Angeles Ave flooded Severe Storms and
Flooding
DR-1577 12/27/2004-
1/11/2005
(Simi Valley: 1/7-
11/2005)
$21,588. In January 2005, winter storms brought heavy rains to the region. The Ventura River reached a maximum stage of 17.5 feet and maximum discharge of 152,560 cfs. High water flows, scouring, and washouts in the Ventura River damaged several water wells and exposed water lines owned by the Ojai Valley Sanitary District. Severe erosion occurred along both embankments of the Ventura River. The Calleguas Creek topped its banks near the state hospital in Camarillo. Damage from the January 2005 storms totaled more than $200 million.

Wildfire (Simi Fire) FM-250410/24–11/11/20
03 Per CAL FIRE: 108K acres burned, 315 structures destroyed, 11 structures damaged.

Wildfire DR-1498 10/21/2003-
3/31/2004
Impacted Ventura County.
785

9. City of Simi Valley
9-13
Type of Event
FEMA
Disaster # Date Damage Assessment
Severe Storms, Tornado,
High Winds and Flooding
DR-1267 12/20-28/1998Impacted Ventura County.

Severe Winter Storms and
Flooding (“El Nino” winter)
DR-1203 2/2 – 4/30/1998In this “El Nino” winter, Simi Valley received 17.2 inches of rain during February. The maximum flow in Calleguas Creek as recorded at the California State University Channel Islands was 21,600 ft³/s, which caused overtopping of the bridges at Pacific Coast Highway.

Wildfires (Calabasas/Malibu
Fires)
EM-3120 10/21-31/1996 Impacted Ventura County.

Severe Storms and
Flooding
DR-1046 2/13-4/19/1995
(Simi Valley: 1/3-
10/1995;
3/10/1995)
Rainfall intensities in some locations were equivalent or greater than 100- year frequency precipitation. Significant local flooding occurred as a result of channels and local storm drains being overtaxed. On March 10, a cooler winter storm brought significant amounts of precipitation with damaging results due to the saturated soil conditions. The peak flow recorded on Calleguas Creek at the stream gauge above Highway 101 was 9,120 ft³/s and at the CSUCI gauge, it was 14,900 ft³/s.

Earthquake (Northridge)DR-1008 1/17-11/30/1994 The Simi Valley Police station was badly damaged and eventually had to be abandoned. Hwy 118 was badly damaged and unusable for months. In the greater Los Angeles area, the 6.7 earthquake caused 57 deaths; 9,253 injuries and displaced over 20,000 people.

Wildfires, Mud &
Landslides, Soil Erosion &
Flooding
DR-1005 10/26-4/22/1994Impacted Ventura County.

Severe Storm, Mud &
Landslides, Flooding
DR-979 1/5-3/20/1993Impacted Ventura County.

Severe Storm, Severe
Weather, Flooding, Mud &
Landslide
DR-935 2/10-19/1992 The storm lasted five days, leaving flood control structures damaged, full of debris, and vulnerable to future storms. Of primary concern in Ventura County was erosion of channels and removal of debris following flood flows. The seven-day depths in Ventura County ranged from 6 to 13 inches, which represented about 60-65 percent of the mean annual rainfall. Although the peak flow in Calleguas Creek was estimated to be about a 10-year event, approximately one million cubic yards of sediment was deposited in the channel system. Conejo Creek contributed much of the sediment, as it was running higher than Calleguas Creek at the confluence of the two streams. On Calleguas Creek, the Lewis Street bridge abutments were undermined and required stone placement on them to prevent further damage.

Severe Weather (Severe
Freeze)
DR-894 12/19/1990-
1/3/1991 Minor flooding of streets, including the First Street bridge and Los Angeles Ave/Madera Road.

Severe Storm and FloodingDR-677 1/21-3/30/1983
(Ventura County:
2/25-3/3/1983)
With the ground wet from a January storm, heavy precipitation produced high flows in most creeks in southern California. On Collogues Creek, at the CSUCI stream gage, Madera St. stream gauge, and the stream gauge above Highway 101, the peak discharges of record occurred, 26,600 ft³/s, 10,570 ft³/s and 17,200 ft³/s, respectively. As in 1980, the Calleguas Creek levee was breached. The maximum peak discharge on Conejo Creek at the stream gauge above Highway 101 was 14,000 ft³/s.
786
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 9-14
Type of Event
FEMA
Disaster # Date Damage Assessment
Severe Storm and FloodingN/A 2/13-22/1980 A series of varying intensity fronts coming from the west soaked southern California with eight days of nearly continuous rain. Six storms moved through southern California during February 13-22. The strongest front passed the area midday on Saturday February 16, producing the second highest peak discharge of record on Calleguas Creek of 25,300 ft³/s at the CSUCI stream gauge, 9,310 ft³/s at the Madera St. stream gauge, and 14,000 ft³/s at the stream gauge above Highway 101. This storm caused a breach of the west levee of Calleguas Creek below Hueneme Road, with an estimated total of 24,000 acre-ft of water flowing through the breach before it was repaired. The maximum peak discharge on Conejo Creek at the stream gauge above Highway 101 was 11,800 ft³/s.

Severe Storms and
Flooding
DR-547 2/15/1978
(Simi Valley:
2/28-3/5/1978)
Storms and accompanying flooding throughout February saturated the ground. A last front on March 4 brought heavy rain, thunderstorms and gale force winds. Measurements were 7,730 ft³/s at the Madera St. stream gauge and 8,600 ft³/s at the Moorpark stream gauge.

Severe Storms and
Flooding
DR-364 2/8/1973 Impacted Ventura County.

Wildfire DR-295 9/29/1970 Impacted Ventura County.

9.6.2 Hazard Risk Ranking
Table 9-12 presents a local ranking of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property, and the economy. Mitigation actions primarily target hazards with high and medium rankings.

Table 9-12.Hazard Risk Ranking
Rank Hazard Risk RankingScore Risk Category
1 Wildfire 36 High
1 Landslide 36 High
3 Earthquake 32 Medium
4 Flooding 24 Medium
4 Severe Storms 24 Medium
4 Severe Weather 24 Medium
5 Dam Failure 22 Medium
6 Drought 9 Low

9.6.3 Jurisdiction-Specific Vulnerabilities
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. This section provides information on a few key vulnerabilities for this jurisdiction. Available jurisdiction-specific risk maps of the hazards are provided at the end of this annex.

Repetitive Loss Properties
Repetitive loss records are as follows:
787

9. City of Simi Valley
9-15
Number of FEMA-identified Repetitive-Loss Properties: 0 Number of FEMA-identified Severe-Repetitive-Loss Properties: 0 Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 0
Other Noted Vulnerabilities
The following jurisdiction-specific issues have been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources:

Water tanks and system could be attacked by terrorists using chemical, biological, radiological, nuclear, explosive or other weapons.

Frequent wildfires along the 118 Freeway, mostly caused by humans.

Mitigation actions addressing these issues were prioritized for consideration in the action plan in this annex.

9.7 STATUS OF PREVIOUS PLAN ACTIONS
Table 9-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared.

Table 9-13.Status of Previous Plan Actions
Removed;
Carried Over to Plan
Update
Action Item Completed
No Longer
Feasible
Check if
Yes
Action # in
Update

1.A.1 Modify the City’s zoning ordinance as necessary to address development in hazard areas and reflect changes in the General Plan.

SIM-2
Comment: This is an ongoing process. Safety Element of the Simi Valley General Plan update was adopted in October, 2021. In the update, this action has been reworded for a broader application.

1.B.1 Modify local building codes to address development issues in hazard areas.

In the update, this action has been reworded for a broader application.

SIM-2
Comment: This is an ongoing process. Ordinance 1268 was adopted in 2017 rewriting and significantly expanding the Flood Damage Prevention Ordinance to codify historic City policy and practice as higher regulatory standards for development citywide and particularly within the Special Flood Hazard Areas.

1.B.2 Actively participate in the state and national building code development groups to ensure that development issues in hazard areas are properly addressed.

SIM-2
Comment: This is an ongoing process. In the update, this action has been reworded for a broader application.

1.B.3 Require site-specific studies to evaluate specific hazards in hazard-prone areas and identify alternative site design criteria to mitigate hazards to the maximum extent possible.

SIM-8
Comment: Geotechnical, Soils, and Drainage studies are required for all development. The Planning process requires site-specific studies mostly through the CEQA process to evaluate hazards and promote alternative site design criteria. SVMC 9-64.100, Development Code, Geotechnical (Soils) Reports, SVMC 7-5.602, Flood Damage Prevention, Standards of Construction. This is an ongoing action. In the update, this action has been reworded for a broader application. 788
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 9-16
Removed;
Carried Over to Plan
Update
Action Item Completed
No Longer
Feasible
Check if
Yes
Action # in
Update

1.C.1 Review General Plan, Zoning Codes, Fire Codes, Subdivision Ordinance, and Building Code for consistency.

SIM-2
Comment: The municipal code is routinely reviewed to ensure consistency with NFIP and CRS standards and requirements along with current floodplain management state of practice. This is an ongoing action. In the update, this action has been reworded for a broader application.

1.C.2 Establish hazard mitigation training for development staff. SIM-8 Comment: PW Development Services staff maintains competency in floodplain management through continual training and at least one staff member holds a Certified Floodplain Manager certificate from the American Society of Floodplain Managers. This is an ongoing action. In the update, this action has been reworded for a broader application.

1.D.1 Update databases/Geographic Information System (GIS), with particular attention to maintaining hazard overlay layers.

SIM-8
Comment:The City’s NFIP SFHA GIS layers are updated whenever FEMA issues FIRM updates and on an ongoing basis. ESRI will perform annual maintenance on GIS system. In the update, this action has been reworded for a broader application.

2.A.1 Assist local mobile home parks with their community preparedness plans. SIM-10 Comment: SVOES can conduct outreach via a preparedness campaign. Not completed due to lack of staff capacity. In the update, this action has been reworded for a broader application.

2.A.2 Develop and conduct a variety of community workshops to educate about earthquake preparedness and the benefits of retrofitting buildings for improved seismic performance. In the update, this action has been reworded for a broader application.

SIM-10
Comment: SVOES can conduct outreach via a preparedness campaign in partnership with Building & Safety. Not completed due to lack of staff capacity.

2.A.3 Increase awareness among at-risk populations of emerging earthquake damage mitigation techniques.

SIM-10
Comment: SVOES can conduct outreach via a preparedness campaign. Not completed due to lack of staff capacity. In the update, this action has been reworded for a broader application.

2.A.4 Develop a program that identifies the needs of senior citizens and assists them to meet those needs.

Comment:The County is responsible for keeping updated records on seniors who may need assistance evacuating in an emergency.

This is not a responsibility of the City.

2.B.1Provide hazard mitigation links on the Chamber of Commerce’s website and the City’s website.

SIM-10
Comment: SVOES can conduct outreach via a preparedness campaign. Not completed due to lack of staff capacity. In the update, this action has been reworded for a broader application.

3.A.1Promote the upgrade of buildings to provide acceptable performance during an earthquake and adopt cost-effective mitigation techniques for both structural and non-structural elements.

SIM-1
SIM-9
Comment:SVOES can conduct outreach via a preparedness campaign in partnership with Building & Safety. Not completed due to lack of staff capacity. In the update, this action has been reworded for a broader application.

3.A.2Conduct a seismic safety survey/assessment of the City’s facilities to ensure that heavy furniture and equipment are properly secured.

SIM-9
Comment: Ongoing as personnel are added and moved. In the update, this action has been reworded for a broader application.
789

9. City of Simi Valley
9-17
Removed;
Carried Over to Plan
Update
Action Item Completed
No Longer
Feasible
Check if
Yes
Action # in
Update

3.A.3Support legislative efforts to provide funding for hospital earthquake retrofit projects.

Comment: This is not currently in our Legislative Platform and would need to be included in order for the City to take action on legislation without going to the Council for approval first.

3.B.1 Retrofit water system infrastructure to seismic safety standards. SIM-9 Comment: A seismic evaluation of water system infrastructure was completed in 2021. The District will schedule projects to improve and replace facilities based on public safety and operational importance. In the update, this action has been reworded for a broader application.

3.B.2 Retrofit sanitation system infrastructure to
seismic safety standards
SIM-1
Comment: The building seismic retrofit projects that were identified in the 2011 Sanitation Asset Reliability Assessment have been completed. In the update, this action has been reworded for a broader application.

3.B.3 Conduct seismic non-structural and structural retrofit of critical facilities and infrastructure.

SIM-1
SIM-9
Comment: Construction has begun on a project to repair and replace structural elements at the City’s Public Services Center and Garage Facility. Anticipated completion is Spring 2022. In the update, this action has been reworded for a broader application.

3.C.1 Identify multi-unit buildings (e.g. soft story construction) that may suffer structural failures in earthquakes.

SIM-9
Comment: This is an opportunity for earthquake mitigation. Not completed due to lack of staff capacity and funding. In the update, this action has been reworded for a broader application.

4.A.1 Implement a fuel reduction program, such as the collection and disposal of dead fuel, within open spaces and around critical facilities and residential structures with high or very high wildfire zones.

SIM-12
Comment: VCFPD Ordinance 31 and Fire Hazard Reduction Program, which is an ongoing program. In the update, this actionhas been reworded for a broader application and to align with VCFPD’s lead.

4.A.2 Create a vegetation management program that provides vegetation management services to the elderly, disabled, or low income property owners who lack the resources to remove flammable vegetation near their homes.

SIM-12
Comment: This is an opportunity for wildfire mitigation. Not completed due to lack of staff capacity. In the update, this action has been reworded for a broader application and to align with VCFPD’s lead.

4.A.3 Implement a fuel modification program that includes maintenance requirements, plan submittal and approval process and enforcement.

SIM-12
Comment: Ventura County Fire Code Section W106-Fire Protection, Fuel Modification and Vegetation Management Plans and FHRP Ongoing program. In the update, this action has been reworded for a broader application and to align with VCFPD’s lead.

5.A.1 Limit uses in floodways to those tolerant of occasional flooding, including but not limited to agriculture, outdoor recreation and natural resource areas.

SIM-4
Comment: Development within floodways is prohibited. Maintenance of open space as a natural resource area and/or for recreation and agriculture is encouraged. SVMC 7-5.601, Flood Damage Prevention, Prohibitions. Simi Valley General Plan Open Space Element.

Ongoing. In the update, this action has been reworded for a broader application.

5. B.1 Discourage the disruption of natural flowage patterns and encourage the use of natural drainage ways in new development.

SIM-4
Comment: Disruption of natural flowage patterns is prohibited and maintenance of natural drainage ways within new development is enforced. SVMC 9-32.120, Development Code, Drainage Standards. Ongoing. In the update, this action has been reworded for a broader application.
790
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 9-18
Removed;
Carried Over to Plan
Update
Action Item Completed
No Longer
Feasible
Check if
Yes
Action # in
Update

5.C.1Submit Letters of Map Revision/ Letters of Map Amendment to FEMA within a prescribed period of time upon completion of drainage improvements or flood- proofing. SVMC 7-5.605, Flood Damage Prevention, Standards for subdivisions and other proposed development
SIM-4
Comment: SVMC 7-5.605, Flood Damage Prevention, Standards for subdivisions and other proposed development. Ongoing. In the update, this action has been reworded for a broader application.

6.A.1Create and maintain a mailing list of all addresses with dam inundation areas for mailings and public information documents.

SIM-14
Comment: Creation of the mailing list is pending CalOES approval of VCPWA-WP EAPs for each of the 3 State jurisdictional dams within the City. Inundation maps and EAPs for jurisdictional dams owned by the Calleguas Municipal Water District and the Sinaloa Lake homeowners’ association are also pending. In the update, this action has been reworded for a broader application.

6.A.2Create and maintain a special grouping for emergency notification system users within the dam inundation areas for emergency information delivery.

SIM-14
Comment: OES will leverage VC Alert. Ongoing. In the update, this action has been reworded for a broader application.

7.A.1Increase field personnel’s awareness of hazardous materials incidents and the proper response.

SIM-11
Comment: SVPD conducts regular trainings during briefings and will continue these. In the update, this action has been reworded for a broader application.

7.B.1Establish and maintain relationships with operators and regulators involved in the transport, extraction, processing and use of hazardous materials.

SIM-11
Comment: City code Title 6 Chapter 10 addresses hazardous wastes. Title 9 Chapter 9-26.070 regulates industrial storage. Title 6 Chapter 13 describes the need for plans to prevent releases of hazardous materials/wastes into the sewer system. Dept. Of Transportation regulates rail cars. The Ventura County Certified Unified Program Agency regulates the storage of hazardous materials on commercial properties. Ongoing. In the update, this action has been reworded for a broader application.

9.8 HAZARD MITIGATION ACTION PLAN
Table 9-14 lists the identified actions, which make up the hazard mitigation action plan for this jurisdiction. Table 9-15 identifies the priority for each action. Table 9-16 summarizes the mitigation actions by hazard of concern and mitigation type.

Table 9-14.Hazard Mitigation Action Plan Matrix
BenefitsNew
or Existing
Assets Objectives MetLead Agency Support Agency
Estimated
Cost Sources of FundingTimeline
Action SIM-1—Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.

Hazards Mitigated:Wildfire, Landslide, Earthquake, Flooding, Severe Storms, Severe Weather, Dam Failure Existing 9, 10, 11, 16 City of Simi ValleyVentura County OESHigh FEMA HMA (BRIC, FMA, PDM and HMGP)
Short-term
Action SIM-2—Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community, including Simi Valley General Plan, Municipal Code, Zoning Ordinance.

Hazards Mitigated:Wildfires, Landslides, Earthquakes, Flooding, Dam Failure New & Existing1, 2, 4, 5, 6, 9, 10,
11, 13, 14, 15, 16
City of Simi ValleyVentura County Fire Dept,
VCSOES
Low Staff Time, General FundsOngoing
791

9. City of Simi Valley
9-19
Benefits New
or Existing
Assets Objectives MetLead Agency Support Agency
Estimated
Cost Sources of FundingTimeline
Action SIM-3—Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.

Hazards Mitigated:Wildfire, Landslide, Earthquake, Flooding, Severe Storms, Severe Weather, Dam Failure, Drought New & Existing 1-19 City of Simi ValleyVentura County Fire Dept, VCSOES
Low Staff Time, General Funds Short-term
Action SIM-4—Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements:

Enforce the flood damage prevention ordinance.

Participate in floodplain identification and mapping updates.

Provide public assistance/informationon floodplain requirements and impacts.

Hazards Mitigated:Flooding, Dam Failure, Severe Storms
New & Existing 1, 4, 11 City of Simi Valley Public Works Low Staff Time, General FundsOngoing Action SIM-5—Identify and pursue strategies to increase adaptive capacity to climate change including but not limited to the following:

Update the Climate Action Plan and other City plans, when necessary and applicable to remain in compliance and leverage opportunities.

Explore clean air technologies for City equipment and infrastructure.

Hazards Mitigated:Wildfire, Landslide, Flooding, Drought New & Existing 1, 3, 4 City of Simi ValleyInterdepartmental Low Staff Time,General FundsShort-term Action SIM-6—Purchase generators for critical facilities and infrastructure that lack adequate backup power, including City Hall, Police Station and Senior Center.

Hazards Mitigated:Wildfire,Landslide,Earthquake,Flooding,Severe Storms,Severe Weather,Dam Failure Existing 2, 6, 9 City Manager’s
Office
Public Works High Staff time, General and
enterprise funds, HMGP,
BRIC
Long-term
Action SIM-7—Develop evacuation routes and plans, partnering with neighboring cities and counties.

Hazards Mitigated:Wildfire,Landslide,Earthquake,Flooding,Dam Failure Existing 1, 2, 8, 17 City of Simi Valley Cities of Thousand Oaks & Moorpark; VCSOES;
VCFPD
Low Staff Time, CDBG20,FEMA

HMA (BRIC, FMA, HMGP),
Short-term
Action SIM-8—Increase knowledge of hazard areas and understanding of vulnerability and risk to life and property in hazard-prone areas, including but not limited to these items:

Conduct site-specific studies to evaluate hazards and identify alternative site design criteria.

Continue ongoing training for development staff.

Update GIS hazard overlay layers.

Map new earth movement hazards and make information available to staff, developers, and residents so that soil types, slope percentage, drainage, or other critical factors are used to identify landslide prone areas Develop flood-after-fire scenarios after wildland fires to identify risks and develop mitigation measures Hazards Mitigated:Earthquake, Wildfire, Landslide, Flooding, Dam Failure, Severe Storms, Severe Weather New & Existing1, 2, 3, 5, 6, 7, 8,
9, 12, 14, 15, 16,
17, 19
Public Works Environmental ServicesMedium General Fund/Staff time,

HMGP, BRIC, FMA
Ongoing
Action SIM-9—Perform structure-specific,all-risk, vulnerability assessment of all City-owned critical facilities (including bridge,water, sanitation and storm drain infrastructure).

Identify potentially vulnerable private utility systems including electric, gas, oil, water, sewer, communications and internet.

Hazards Mitigated:Earthquake,Flooding,Severe Storms,Severe Weather,Dam Failure Existing 1, 2, 4, 6, 9, 18, 19Building & Safety Public Works Low General Fund/Staff time,

HMGP, BRIC, FMA
Long-term
792
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 9-20
Benefits New
or Existing
Assets Objectives MetLead Agency Support Agency
Estimated
Cost Sources of FundingTimeline
Action SIM-10—Create and conduct hazard mitigation and emergency preparedness outreach campaigns for the low-to-moderate income and Spanish-speaking communities then adapt and expand these campaigns to other demographics and the whole community.

Hazards Mitigated:Earthquake,Wildfire,Landslide,Flooding,Dam Failure,Severe Storms,Severe Weather Existing 1, 2, 4, 5, 7, 10,
12, 13, 14, 15, 16,
17, 18
SVOES City of Simi Valley,

VCSOES, VCFPD
Low Staff Time,CDBG20,
HMGP
Short-term,
Ongoing
Action SIM-11—The City shall continue to provide inspections,emergency response,and enforcement of hazardous materials and waste compliance procedures in the community. The City shall continue to work with relevant agencies regarding enforcement of hazardous materials regulations and continue to conduct household hazardous waste collection events.

Hazards Mitigated:Earthquake, Wildfire, Flooding, Dam Failure Existing 1, 4, 16, 18, 19 Public WorksVentura County Certified Unified Program Agency
Low Staff Time Ongoing
Action SIM-12—Maintain wildfire hazard fuel reduction program for areas that have been identified with overgrown or dead brush, trees and weeds to reduce the potential for tree-to-tree ignition. Ensure that a “maintenance now” component to provide continued fire resistance is part of the program. (Coordinates with Ventura County Fire Protection District Action VFP-6) Hazards Mitigated:Wildfire
New & Existing2,4,5,6,8,10,
11, 13, 14, 15, 18,
19 VCFPD CAL FIRE& USDA Medium FEMA HMA (BRIC, FMAP
and HMGP), Staff Time &
General Funds
Ongoing
Action SIM-13—The City shall amend the local building code to account for additional climate change-induced stressors on buildings, such as including flood proofing for intermittent inundation, building materials to reduce the impacts of high heat days, and fireproofing in preparation for increased wildfire risk.

Hazards Mitigated:Wildfire,Flooding,Severe Storm,Severe Weather New & Existing4, 9, 10, 11, 12,
16, 17
Environmental
Services
Public Works Low Staff time,HMGP,BRIC,
FMA
Ongoing
Action SIM-14—Create a levee and dam failure element for the City’s emergency response plan,including but not limited to these items:

Assess downstream impacts associated with dam incidents.

Develop a public outreach program that informs property owners located in the dam and levee failure inundation areas about voluntary flood insurance.

Hazards Mitigated:Dam Failure
New & Existing1, 7, 9, 17, 19 SVOES, Public
Works
Calleguas Water,Ventura
County Watershed
Protection
Low GF/Staff Time, HMGP,

BRIC, FMA
Short-
Term;
Ongoing
Action SIM-15—Assess and retrofit or upgrade City-owned facilities with identified risks,including but not limited to these items:

Retrofit or upgrade at-risk and deficient government facilities and public utility systems to ensure the operation and timely restoration of essential systems to reasonable levels of service.

Reinforce roads/bridges from flooding through protection activities, including elevating the roads/bridges and installing/widening culverts beneath the roads/bridges or upgrading storm drains.

Hazards Mitigated:Earthquake,Flooding,Severe Storms,Severe Weather,Dam Failure New & Existing1, 2, 4, 6, 9, 18, 19 Environmental
Services, Public
Works
FEMA,CalOES High General Fund,Staff Time,

HMGP, BRIC, FMA
Long Term
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date
Acronyms used here are defined at the beginning of this volume. 793

9. City of Simi Valley
9-21
Table 9-15.Mitigation Action Priority
Action #
# of
Objectives
Met BenefitsCosts
Do Benefits
Equal or
Exceed Cost?
Is Project
Grant-
Eligible?
Can Project Be Funded
Under Existing
Programs/ Budgets?
Implementation
Priority
Grant
Pursuit
Priority
1 4 High High Yes Yes No Medium High
2 12 Medium Low Yes No Yes High Low
3 19 Low Low Yes No Yes High Low
4 3 Medium Low Yes No Yes High Low
5 3 Medium Low Yes No Yes High Low
6 3 High Medium Yes Yes No Low Medium
7 4 Medium Low Yes Yes Yes High Medium
8 14 Medium Low Yes Yes Yes High Low
9 7 Medium High No Yes No Low Medium
10 13 Medium Low Yes Yes Yes High Medium
11 5 Medium Low Yes No Yes High Low
12 12 High Medium Yes Yes Yes High High
13 7 High Medium Yes Yes No Medium High
14 5 Medium Low Yes Yes Yes High Medium
15 7 High High Yes Yes No Low Medium
a. See the introduction to this volume for explanation of priorities.

Table 9-16.Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Type
Hazard Type Prevention
Property
Protection
Public
Education &
Awareness
Natural
Resource
Protection
Emergency
Services
Structural
Projects
Climate
Resilience
Community
Capacity
Buildingb
High-Risk Hazards
Wildfire SIM-1, 2, 3, 5,
10, 11, 12, 13
SIM-1, 2, 3,
5, 10, 11,
12, 13
SIM-2, 3, 5, 7,
10, 11, 12, 13
SIM-2, 3,
11 SIM-3, 6, 7,
10, 11, 12
SIM-1, 2, 3,
5, 13
SIM-3, 5, 13SIM-2, 3, 5, 6,
7, 8, 10
Landslide SIM-1, 2, 3, 5,
14 SIM-1, 2, 3,
5 SIM-2, 3, 5, 7 SIM-2, 3, 5 SIM-3, 6, 7 SIM-1, 2, 3,
5 SIM-3, 5 SIM-2, 3, 5, 7,
8 Medium-Risk Hazards
Earthquake SIM-1, 2, 3, 9,
10, 11, 15
SIM-1, 2, 3,
10, 11, 15
SIM-3, 7, 10,
11, 15
SIM-3, 11 SIM-3, 6, 7,
10, 11
SIM-1, 2, 3,
9, 15
SIM-3 SIM-2, 3, 6, 7,
8, 10, 15
Flooding SIM-1, 2, 3, 4, 5,
9, 10, 11, 13, 15
SIM-1, 2, 3,
4, 5, 10, 11,
13, 15
SIM-3, 4, 5, 7,
10, 11
13, 15
SIM-3, 5,
11 SIM-3, 6, 7,
10, 11
SIM-1, 2, 3,
4, 5, 9, 13,
15 SIM-3, 5 SIM-2, 3, 4, 5,
6, 7, 8, 10, 15
Severe StormsSIM-3, 4, 9, 10,
13, 15
SIM-3, 4,
10, 13, 15
SIM-3, 4, 10,
13 15
SIM-3 SIM-3, 6, 10SIM-3, 4, 6,
9, 15
SIM-3 SIM-3, 4, 6, 8,
10, 15
Severe WeatherSIM-3, 9, 10,13,
15 SIM-3, 10,
13, 15
SIM-3, 10, 13,
15 SIM-3 SIM-3, 6, 10SIM-3, 6, 9,
15 SIM-3 SIM-3, 6, 8,
10, 15
Dam Failure SIM-3, 4, 9, 10,
11, 14, 15
SIM-3, 4,
10, 11, 15
SIM-3, 4, 8,
10, 11, 14, 15
SIM-3, 11SIM-3, 6, 7, 8,
10, 11, 14, 15
SIM-3, 4, 6,
9, 15
SIM-3 SIM-2, 3, 4, 6,
7, 8, 10, 14, 15
794
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 9-22
Action Addressing Hazard,by Mitigation Type
Hazard Type Prevention
Property
Protection
Public
Education &
Awareness
Natural
Resource
Protection
Emergency
Services
Structural
Projects
Climate
Resilience
Community
Capacity
Buildingb
Low-Risk Hazards
Drought SIM-3, 5 SIM-3, 5 SIM-3, 5 SIM-3, 5 SIM-3, 5 SIM-3, 5 SIM-3, 5 SIM-3, 5 a. See the introduction to this volume for explanation of mitigation types. b. Note that the jurisdiction did not identify a need for expansion of financial capabilities, based on existing capabilities. The intent of this hazard mitigation plan is to expand the financial capability of the jurisdiction.

9.9 PUBLIC OUTREACH
Table 9-17 lists public outreach activities for this jurisdiction.

Table 9-17.Local Public Outreach
Local Outreach Activity Date
Number of People
Involved
Presented at four Neighborhood Council meetings 9/9,9/14,9/16,9/21 N/A HMP info & survey link via SVPD Nixle sent to residents and posted on social media
7/27/21 N/A
HMP info & survey link via SVPD Tweet 8/17/21 N/A
HMP info & survey link sent to Neighborhood Councils 1-4 E-Notify List. 8/18/21 1, 400 Emergency Services Manager discussed HMP in radio interview10/25/21 N/A

9.10 INFORMATION SOURCES USED FOR THIS ANNEX
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex.

Simi Valley Municipal Code—The municipal code was reviewed for the full capability assessment and for identifying opportunities for action plan integration.

City of Simi Valley Flood Damage Prevention Ordinance—The flood damage prevention ordinance was reviewed for compliance with the National Flood Insurance Program. 2015 Hazard Mitigation Plan—The mitigation strategy action items were used to assess planning and regulatory capabilities and for identifying opportunities for action plan integration. 2018 Emergency Operations Plan—The EOP was reviewed for the full capability assessment and for identifying opportunities for action plan integration and improvement.

Simi Valley General Plan—The General Plan was reviewed for the full capability assessment and for identifying opportunities for action plan integration The following outside resources and references were reviewed:

Hazard Mitigation Plan Annex Development Toolkit—The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan.
795

9. City of Simi Valley
9-23
FIPS Code—https://www.census.gov/geographies/reference-files/2018/demo/popest/2018- fips.html
DUNS #—https://www.dnb.com/duns-number.html
Community Rating System—https://www.fema.gov/floodplain-management/community-rating- system
Building Code Effectiveness Grading Schedule—https://www.isomitigation.com/bcegs/iso-s- building-code-effectiveness-grading-schedule-bcegs.html Public Protection Classification—https://www.isomitigation.com/ppc/ Storm Ready—https://www.weather.gov/stormready/communities Firewise—http://www.firewise.org/usa-recognition-program/map-of-active-participants.aspx Tsunami Ready—https://www.weather.gov/tsunamiready/communities CEQA statute(Public Resources Code Section 21000 and following), the CEQA Guidelines (California Code of Regulations, Title 14, Section 15000 and following) State Subdivision Map Act(Govt. Code Sec. 66410-66499.58) 796
Moorpark
Simi Valley
Thousand Oaks
23 118
118
23 101101
Food, Water, Shelter
Health and Medical
Safety and Security
Major Roads
Selected City
Incorporated Cities
County Boundary
Data Sources: Ventura Co., VCFD,
Casitas MWD, Calleguas MWD,
City of Camarillo, CA Energy
Commission, Cal Trans, EPA,
HIFLD, Esri
Simi Valley
Critical Facilities (1 of 2)
0 1 20.5 Miles
797
Moorpark
Simi Valley
Thousand Oaks
23 118
118
23 101101
Communications
Energy
Hazardous Material
Transportation
Major Roads
Selected City
Incorporated Cities
County Boundary
Data Sources: Ventura Co., VCFD,
Casitas MWD, Calleguas MWD,
City of Camarillo, CA Energy
Commission, Cal Trans, EPA,
HIFLD, Esri
Simi Valley
Critical Facilities (1 of 2)
0 1 20.5 Miles
798
Moorpark
Simi Valley
Thousand Oaks
23 118
118
23 101101
Data Sources: Ventura Co.,
CA DWR, Esri
Simi Valley
Dam Failure
Inundation Areas
0 1 20.5 Miles
Combined Inundation
Areas
Major Roads
Selected City
Incorporated Cities
County Boundary
799
Moorpark
Simi Valley
Thousand Oaks
23 118
118
23 101101
Data Sources: Ventura Co.,
CGS, Esri
Simi Valley
NEHRP Soil Class
0 1 20.5 Miles
C (Dense soil/soft rock)
D (Stiff soil)
Major Roads
Selected City
Incorporated Cities
County Boundary
800
Moorpark
Simi Valley
Thousand Oaks
23 118
118
23 101101
Data Sources: Ventura Co.,
Esri
Simi Valley
Liquefaction Susceptibility
0 1 20.5 Miles
Liquefaction zone
Major Roads
Selected City
Incorporated Cities
County Boundary
801
Moorpark
Simi Valley
Thousand Oaks
23 118
118
23 101101
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Simi Valley
100-Year Probabilistic
Earthquake Scenario
0 1 20.5 Miles
Mercalli Intensity Scale
VII (Very Strong/Moderate)
Major Roads
Selected City
Incorporated Cities
County Boundary
802
Moorpark
Simi Valley
Thousand Oaks
23 118
118
23 101101
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Simi Valley
Oak Ridge M7.16
Earthquake Scenario
0 1 20.5 Miles
Mercalli Intensity Scale
VII (Very Strong/Moderate)
VIII (Severe/Moderate-Heavy)
Major Roads
Selected City
Incorporated Cities
County Boundary
803
Moorpark
Simi Valley
Thousand Oaks
23 118
118
23 101101
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Simi Valley
Pitas Point M7.12
Earthquake Scenario
0 1 20.5 Miles
Mercalli Intensity Scale
VI (Strong/Light)
VII (Very Strong/Moderate)
Major Roads
Selected City
Incorporated Cities
County Boundary
804
Moorpark
Simi Valley
Thousand Oaks
23 118
118
23 101101
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Simi Valley
San Cayetano M7.16
Earthquake Scenario
0 1 20.5 Miles
Mercalli Intensity Scale
VI (Strong/Light)
VII (Very Strong/Moderate)
VIII (Severe/Moderate-Heavy)
Major Roads
Selected City
Incorporated Cities
County Boundary
805
Moorpark
Simi Valley
Thousand Oaks
23 118
118
23 101101
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Simi Valley
S. San Andreas M8.03
Earthquake Scenario
0 1 20.5 Miles
Mercalli Intensity Scale
VI (Strong/Light)
VII (Very Strong/Moderate)
Major Roads
Selected City
Incorporated Cities
County Boundary
806
Moorpark
Simi Valley
Thousand Oaks
23 118
118
23 101101
Data Sources: Ventura Co.,
FEMA, Esri
Simi Valley
FEMA Flood Hazard Areas
0 1 20.5 Miles
1% Annual Chance
Flood (100-Year)

0.2% Annual Chance
Flood (500-Year)
Major Roads
Selected City
Incorporated Cities
County Boundary
807
Moorpark
Simi Valley
Thousand Oaks
23 118
118
23 101101
Data Sources: Ventura Co.,
CGS, Esri
Simi Valley
Susceptibility to
Deep-Seated Landslides
0 1 20.5 Miles
Low
Moderate
High
Very High
Major Roads
Selected City
Incorporated Cities
County Boundary
808
Moorpark
Simi Valley
Thousand Oaks
23 118
118
23 101101
Data Sources: Ventura Co.,
CAL FIRE, Esri
Simi Valley
Wildfire Hazard
Severity Zones
0 1 20.5 Miles
Moderate
High
Very High
Major Roads
Selected City
Incorporated Cities
County Boundary
809
10-1

10. CITY OF THOUSAND OAKS

10.1 LOCAL HAZARD MITIGATION PLANNING TEAM
Primary Point of Contact Alternate Point of Contact
Grahame Watts, Emergency Services Manager
2100 Thousand Oaks Blvd.

Thousand Oaks, CA 91362
805-449-2453
[email protected]
Nader Heydari, Deputy Public Works
Director
2100 Thousand Oaks Blvd.

Thousand Oaks, CA 91362
805-449-2392
[email protected]
This annex was developed by the local hazard mitigation planning team, whose members are listed in Table 10-1.

Table 10-1.Local Mitigation Planning Team Members
Name Title
Grahame Watts Emergency Services Manager (Project Manager) Jim Taylor Senior Civil Engineer
John Brooks Senior Analyst
Michael Devlahovich Utilities Maintenance Supervisor
Kari Finley Planning Division Manager
Iain Holt Senior Planner
David Chavez Landscape Maintenance Supervisor

10.2 JURISDICTION PROFILE

10.2.1 Location and Features
Thousand Oaks is the second-largest city in Ventura County and is 40 miles northwest of Downtown Los Angeles. The City is named after the many oak trees present in the area. The City forms the central populated core of the Conejo Valley and includes two-thirds of master-planned community of Westlake Village and most of Newbury Park, which were annexed by the city during the late 1960s and 1970s.

The City of Thousand Oaks has a population of 126,484 and is nearly built out, placing emphasis upon in-fill development, redevelopment and maintenance of aging infrastructure. The Downtown Core Master Plan provides the blueprint for a centralized, walkable shopping, dining and entertainment area adjacent to the Civic Arts Plaza/City Hall, and land use alternatives under the General Plan were 810
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 10-2
updated for increased density and mixed-use development along the Thousand Oaks Boulevard corridor.

10.2.2 History
Thousand Oaks was incorporated in 1964 and has evolved from a rural Ventura County settlement into an attractive and desirable Southern California city. Thousand Oaks offers the ideal mixture of commercial, industrial, residential and recreational space in an exceptional location.

The City’s history dates to the Chumash Native Americans who dwelled in the Conejo Valley hundreds of years ago. In 1542, the area was discovered by Spanish explorer Juan Rodriguez Cabrillo, who claimed the land for his Spanish king. The area remained virtually unsettled until the early 1800s when the Spanish governor granted 48,671 acres of land grants to loyal soldiers—land which included the Conejo Valley (Conejo is the Spanish word for rabbit which are abundant in the area).

Throughout the 19th Century, early pioneers migrated to the area. The first post office was built in 1875, and the small settlement became a stop on the stagecoach route between Los Angeles and San Francisco. With the invention of the motor car and the construction of a highway between those two major cities, the Conejo Valley began to evolve.

10.2.3 Governing Body Format
Thousand Oaks is a General Law city with a Council/Manager form of government. This type of government structure designates the City Council as the policy making body, who appoint the City Manager to carrying out Council policy.

The Council consists of five members elected from residents at large. Council members serve four-year staggered terms. Municipal elections are held in November of even numbered years. The City Council annually selects a Mayor who serves as the presiding officer during City Council meetings that are scheduled on Tuesdays approximately two times per month.

The Thousand Oaks City Council is responsible for the adoption of this plan and the Public Works Department oversees its implementation.

10.3 CURRENT TRENDS

10.3.1 Population
According to the California Department of Finance, the population of the Thousand Oaks as of January 2020 was 126,484. Since 2010, the population has decreased at an average annual rate of 0.02 percent.

10.3.2 Development
The development mission of Thousand Oaks is to be stewards of the City’s General Plan, and to assist the community with land development, housing, construction, code compliance, open space, and regional issues, all of which are balanced with the City’s environment and resources. 811

10. City of Thousand Oaks
10-3
Table 10-2 summarizes development trends in the period since the preparation of the previous hazard mitigation plan, as well as expected future development trends.

Table 10-2.Recent and Expected Future Development Trends Criterion Response
Has the Cityannexed any land since the
preparation of the previous hazard mitigation
plan?
Yes
If yes, give the estimated area annexed
and estimated number of parcels or
structures.
2015—Kelly Estates A & B: Parcel; “A” = 20.32 ac., Parcel “B” = 1.26 ac. (existing developed single-family lots in former County “island”) 2021—Edward-Ventu Park Parcels A & B: Parcel “A” = 0.18 ac., Parcel “B” = 0.22 ac. (2- single-family lots)
Isthe Cityexpected to annex any areas
during the performance period of this plan?
No
Are any areas targeted for development or
major redevelopment in the next five years?
Yes
If yes, briefly describe, including whether
any of the areas are in known hazard risk
areas
These areas primarily consist of larger scale residential projects along Thousand Oaks Boulevard as included in the Community Development Department’s Development Activity Report (May 2021). Projects in the High Fire Severity Hazard Zone includeThe Lakes Residential, One Baxter Way residential and the Shapell Industrial Project (49.64 acres and 754,222 SF of building floor area) at northern section of Rancho Conejo Blvd..

How many permits for new construction were
issued in your jurisdiction since the
preparation of the previous hazard mitigation
plan?
2016 2017 2018 2019 2020
Single Family 2,124 1,984 1,870 1,947 1,870
Multi-Family 315 239 244 369 154
Other (commercial, mixed use, etc.)501 427 379 381 285
Total 2,940 2,650 2,493 2,697 2,179
Provide the number of new-construction
permits for each hazard area or provide a
qualitative description of where development
has occurred.

Special Flood Hazard Areas: 75
Landslide: 274
High Liquefaction Areas: 132
Tsunami Inundation Area: 0
Wildfire Risk Areas: 9,934
Describe the level of buildout in the
jurisdiction, based on your jurisdiction’s
buildable lands inventory. If no such
inventory exists, provide a qualitative
description.

Currently, the City does not have an inventory of buildable lands.There is a theoretical residential capacity for the City of 81,124 dwelling units based on an evaluation of 1996 General Plan land use map governed by Measure E. This maximum capacity does not consider constraints that may result in less buildable area. Based on SCAG’s 2020 Regional Transportation Plan/Sustainable Communities Strategygrowth projections out to 2045, Thousand Oaks population will increase by 15,229, households will increase by 5,269 and employment will increase 9,897.The City is currently undergoing a General Plan Update and the Environmental Impact Report will evaluate new growth projections based on the revised land use map and economic analysis. The anticipated adoption date of the General Plan is in FY 2022-23.

10.4 CAPABILITY ASSESSMENT
This section describes an assessment of existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning.

Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were 812
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 10-4
identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table in this annex identifies these as community capacity building mitigation actions. The findings of the assessment are presented as follows:

An assessment of planning and regulatory capabilities is presented in Table 10-3.

Development and permitting capabilities are presented in Table 10-4.

An assessment of fiscal capabilities is presented in Table 10-5.

An assessment of administrative and technical capabilities is presented in Table 10-6.

An assessment of education and outreach capabilities is presented in Table 10-7.

Information on National Flood Insurance Program (NFIP) compliance is presented in Table 10-8.

Classifications under various community mitigation programs are presented in Table 10-9.

The community’s adaptive capacity for the impacts of climate change is presented in Table 10-10.

Table 10-3.Planning and Regulatory Capability
Local
Authority
Other Jurisdiction
Authority
State
Mandated
Integration
Opportunity?
Codes, Ordinances, & Requirements
Building Code Yes Yes Yes Yes
Comment:TOMC Title 8 Ch.1 Building Code amended to reflect 2019 California Building Code Zoning Code Yes Yes Yes No
Comment:TOMC Title 9 Chapter 1 Flood Control requires building permit fees for Ventura County flood control facilities TOMC Title 9 Chapter 4 Zoning and Chapter 5 Environmental Impact Assessment Subdivisions Yes Yes Yes No
Comment:TOMC Title 9 Chapter 3 Subdivisions.Article 14 Environmental Impact and Grading and Erosion Control Stormwater Management Yes Yes Yes Yes
Comment:TOMC 4-7 (Public Safety, Flood Damage Prevention) Post-Disaster Recovery Yes Yes Yes Yes
Comment:The City Emergency Operations Plan was adopted on February 25, 2020, which includes a section on Disaster Recovery.

Real Estate Disclosure No Yes No No
Comment:The Community Development Department Building Division prepares residential re-sale disclosure reports per TOMC Title 8 Chapter 12.

Growth Management Yes Yes Yes Yes
Comment:Measure E requires voter approval for any amendment to the Land Use Element of the City’s General Plan that: increases residential land use density beyond the City’s General Plan of November 5, 1996 or increases the amount of commercial acreage beyond the City’s General Plan of November 5, 1996. City Council Ordinance No. 1280-NS Site Plan Review Yes Yes Yes Yes
Comment:The Community Development Department Planning Division and Public Works Engineering Division reviews land use entitlements and subdivisions. County Fire and Police Departments also review projects.

Environmental Protection Yes Yes Yes Yes
Comment:The result of a completedVisioning 2064process was the development of a Climate and Environmental Action Plan that is expected to be adopted in FY 2022-23 . The Plan is for the City to be an environmental leader and promoteclimate change adaptation, zero waste, zero net energy usage, reduced water use, and greenhouse gas reduction, including allocation of the necessary resources. New development is subject to environmental review in accordance with CEQA. 813

10. City of Thousand Oaks
10-5
Local
Authority
Other Jurisdiction
Authority
State
Mandated
Integration
Opportunity?
Flood Damage Prevention Yes Yes Yes Yes
Comment:The City’s Water Emergency Operations Plan was adopted in June 2021, which includes a section on Flood Damage Prevention. The City and County of Ventura Public Works also developed a Flood Prevention & Preparedness manual that is posted on the City website. The Flood Damage Prevention Ordinance comprises the TOMC 4-7 (Public Safety, Flood Damage Prevention).

Emergency Management Yes Yes Yes Yes
Comment:The City completed a Risk and Resiliency Assessment as part of America’s Water Infrastructure Act (2018) thatwas submitted to the EPA in December 2020. The City’s Water Emergency Operations Plan was certified through the EPA in June 2021. .

Thousand Oaks Municipal Code Title 4 Section 404.01 describes the City emergency organization, functions and authorities.

Climate Change Yes Yes Yes Yes
Comment:An anticipated City goal is to reduce greenhouse gas by a minimum of 40 percent by 2030 and 80 percent by 2050 to match or exceed the Stategoals. The City’s Climate and Environmental Action Plan is expected to be adopted in FY 2022-23 Planning Documents
City General Plan Yes Yes Yes Yes
Is the City’s plan compliant with Assembly Bill 2140?Yes Comment:The Thousand Oaks City General Plan is being updated and is expected to be adopted in FY2022-23.

Capital Improvement Plan Yes Yes No No
How often is the plan updated?
Comment:The City’s Capital Improvement Plan is part of the City Budget process and is updated every twoyears.

Disaster Debris Management Plan Yes Yes Yes Yes
Comment:The City has a Disaster Debris Management procedure in its adopted EOP, which is complimentary to the County’s Disaster Debris Management Plan.

Floodplain Plan Yes Yes Yes Yes
Comment:In January 2010, the FEMA National Flood Insurance Program mapped the City’s 100-year “Areas of Special Flood Hazard” (floodplains). The City’s Capital Improvement Plan does not directly address a strategized approach to reducing or eliminating 100-year floodplains.

Stormwater Plan Yes Yes Yes Yes
Comment:The City is participating ina Watershed Management Program and theCountywide Stormwater Quality Management Program that are being developed and implemented in compliance with the new State Regional Board Municipal Stormwater Permit.

Urban Water Management Plan Yes Yes Yes Yes
Comment:In June 2021, the City adopted the 1) 2020 Urban Water Management Plan, 2) 2020 Water Shortage Contingency Plan, and 3) Addendum to the 2015 Urban Water Management Plan. Included in the 2020 UWMP are past, present, and projected water use data through 2045: a description of current and future water supply sources and allocations, information on the City’s water conservation program, and background information on the City water system and service area.

Habitat Conservation Plan No No No No
Comment:The City does not have a Habitat Conservation Plan but relies on policies within the Conservation Element of the General Plan. State and Federal agencies are involved as part CEQA review and permitting process. The Conejo Open Space Conservancy Agency (COSCA), a joint-powers authority between the City and the Conejo Recreation and Park District that implements conservation projects and manages habitat lands.

Economic Development Plan Yes Yes No No
Comment:The City Council adopted its Economic Development Plan on November 7, 2017 Shoreline Management Plan No No No No
Comment:Thousand Oaks is inland and does not have a shoreline.

Community Wildfire Protection Plan Yes Yes Yes Yes
Comment:Wildfire protection is described in the City’s EOP in addition to fire protection services provided by the Ventura County Fire Protection District. The City’s Water Emergency Operations Plan and Risk and Resiliency Assessment addresseswildfire zones, specifically within the City’s water infrastructure. 814
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 10-6
Local
Authority
Other Jurisdiction
Authority
State
Mandated
Integration
Opportunity?
Forest Management Plan Yes Yes Yes Yes
Comment:The City Forestry Master Plan was adopted in 2017 and applies to City-maintained plantings and provides historical background, design and management and community participation.

Climate Action Plan Yes Yes Yes Yes
Comment:One of the City Council goals is to consider a planto reduce greenhouse gas by a minimum of 40 percent by 2030 and 80 percent by 2050 to meet or exceed the state goals. The City’s Climate and Environmental Action Plan is expected to be considered in FY 2022-23.

Emergency Management Planning Yes Yes Yes Yes
Comment:The City’s Water Emergency Operations Plan was adopted in June 2021. Thousand Oaks Municipal Code Title 4 Section 404.01 describes the City emergency organization, functions and authorities.

Threat & Hazard Identification & Risk Assessment (THIRA)Yes No No No Comment:In December 2017 the City contracted for the completion of a City facilities security for the two City Theaters. In September 2019, a similar assessment was completed for the Civic Arts Plaza/City Hall, both libraries, Municipal Service Center and the Hill Canyon Treatment Plant. The City completed a Risk and Resiliency Assessment in December 2020.

Post-Disaster Recovery Plan Yes Yes Yes No
Comment:The City’s Water Emergency Operations Plan was adopted in June 2021, which includes a section on Disaster Recovery Continuity of Operations Plan Yes Yes Yes No
Comment:The City’s Water Emergency Operations Plan was adopted in June 2021 which includes a section on Continuity of Operations.

Public Health Planning No Yes Yes No
Comment:The City’s Water Emergency Operations Plan was adopted in June 2021, which includes a section on public health which as managed by the Ventura County Public Health Department.

Table 10-4.Development and Permitting Capability
Criterion Response
Does the Cityissue development permits? Yes
If no, who does? If yes, which department?Public WorksDepartment, Community Development Department Does the Cityhave the ability to track permits by hazard area? Yes Does the City have a buildable lands inventory? No
Table 10-5.Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants Yes- City Council approval of application/acceptance and award by U.S.

Department of Housing and Urban Development
Capital Improvements Project Funding Yes-City Council approval.

Authority to Levy Taxes for Specific PurposesYes-City Council and voter approval.

User Fees for Water, Sewer, Gas or Electric ServiceYes City Council approval and Proposition 218 protest ballot.

Incur Debt through General Obligation BondsYes City Council and voter approval.

Incur Debt through Special Tax Bonds Yes City Council and voter approval.

Incur Debt through Private Activity Bonds Yes City Council approval.

Withhold Public Expenditures in Hazard-Prone Areas No
State-Sponsored Grant Programs Yes City Council approval of application/acceptance and award by State DevelopmentImpact Fees for Homebuyers or Developers YesCity Council approval. 815

10. City of Thousand Oaks
10-7
Financial Resource Accessible or Eligible to Use?
Other Yes
If yes, specify: Incur debt through Lease Revenue Bonds with City Council approval.

Public-Private Partnerships with City Council approval.

Table 10-6.Administrative and Technical Capability
Staff/Personnel Resource Available?
Planners or engineers with knowledge of land development and land management practicesYes If Yes, Department /Position:Community Development Department & Public Works Department. Senior Planners, Senior Engineers and Division Managers.

Engineers or professionals trained in building or infrastructure construction practices Yes If Yes, Department /Position:Community Development Department, Building and Safety Division plan checkers and inspectors Planners or engineers with an understanding of natural hazards Yes If Yes, Department /Position:Community Development Department and Public Works Department. Senior Planners, Senior Engineers and Division Managers.

City staff with training in benefit-cost analysis Yes
Surveyors Yes
If Yes, Department /Position:Public Works Department, Engineering Services Division City personnel skilled or trained in GIS applications Yes If Yes, Department /Position:Public Works Department and Finance Department, IT Division Scientist familiar with natural hazards in local area No Emergency Services Manager Yes
If Yes, Department /Position:Public Works Department, Emergency Services Manager.

Grant writers Yes
If Yes, Department /Position:Public Works, Community Development, Finance & Library Departments—The City has several staff in multiple departments that are skilled in writing and administering state and federal grant funded programs.

Table 10-7.Education and Outreach Capability
Criterion Response
Does City have a public information officer or communications office? Yes Does City have personnel skilled or trained in website development? Yes Does City have hazard mitigation information available on your website? Yes If yes, briefly describe:Hazard mitigation is part of the City’s Emergency Management Program administered by the Public Works Department, which includes the posting of the City’s current Hazard Mitigation Plan Does City use social media for hazard mitigation education and outreach? Yes If yes, briefly describe:The City utilizes several electronic community newsletters as well as Social Media for Facebook, Instagram, LinkedIn and Twitter.

Does City have any citizen boards or commissions that address issues related to hazard mitigation? No Does City have any other programs in place that could be used to communicate hazard-related information? Yes If yes, briefly describe:Social media posts, newsletters and the City website Does City have any established warning systems for hazard events? Yes If yes, briefly describe:The Cities and County of Ventura all subscribe to VC Alert, a mass notification system for local and statewide emergency warnings, incidents and hazards.
816
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 10-8
Table 10-8.National Flood Insurance Program Compliance
Criterion Response
What City l department is responsible for floodplain management? Public Works Department Who is yourCityfloodplain administrator? (department/position) Jim Taylor, Senior Civil Engineer, Public Works
Are any certified floodplain managers on staff for your City? Yes; Jim Taylor, Senior Civil Engineer What is the date thatyour flood damage prevention ordinancewas last amended? February 11, 2010 Does the City floodplain management program meet or exceed minimum requirements?Exceeds If exceeds, in what ways?Pursuant to Thousand Oaks Municipal CodeOrdinance(TOMC)1995-20, the City ensures newly- developed building pads are protected from a 100-year flooding event, regardless of whether the location is within a FEMA NFIP-designated floodplain
When was the most recent Community Assistance Visit or Community Assistance Contact?Salomon Miranda, California DWR
April 24, 2018
Does the Cityhave any outstanding NFIP compliance violations that need to be addressed?
No
Are any Risk MAP projects currently underway in your jurisdiction? No Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes If no, state why.

Does the Cityfloodplain management staff need any assistance or training to support its floodplain management program?
No
Does the City participate in the Community Rating System (CRS)? No If no, is your jurisdiction interested in joining the CRS program?No How many flood insurance policies are in force in the City? a 336 What is the insurance in force?$109,948,800
What is the premium in force?$253,564
How many total loss claims have been filed in the City? a 62 What were the total payments for losses?$341,390
a. According to FEMA statistics as of March 31, 2021
Table 10-9.Community Classifications
Participating? Classification Date Classified
FIPS Code Yes 95-2367314 N/A
DUNS No. Yes 055751937 N/A
Community Rating System No N/A N/A
Building Code Effectiveness Grading Schedule No N/A N/A Public Protection(VCFPD) Yes 03/3X 12/21/18
Storm Ready Yes N/A N/A
Firewise No N/A N/A
Tsunami Ready No N/A N/A
817

10. City of Thousand Oaks
10-9
Table 10-10.Adaptive Capacity for Climate Change
Criterion
Jurisdiction
Ratinga
Technical Capacity
City-level understanding of potential climate change impacts Medium Comment: Staff andCity Council are aware of potential climate change impacts and actions to address these issues will be included in the General Plan update and the City’s Climate and Environmental Action Plan.

City-level monitoring of climate change impacts Medium
Comment: Staff and the City Council are aware of potential climate change impacts and actions to address these issues will be included in the General Plan update and Climate and Environmental Action Plan.

Technical resources to assess proposed strategies for feasibility and externalities High Comment: The City has capacity internally and the ability to engage consultants for specialized tasks.

City-level capacity for development of greenhouse gas (GHG) emissions inventory High Comment: The City has an internally developed GHG inventory.

Capital planning and land use decisions informed by potential climate impacts Medium Comment: The City’s General Plan will include Sustainability components throughout the document and is being developed in coordination with the City’s Climate & Environmental Action Plan Participation in regional groups addressing climate risks Medium Comment: The City is a member of the Ventura County Regional Energy Alliance which addresses climate change issues within Thousand Oaks and Ventura County.

Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processesMedium Comment: On January 12, 2021 the City Council meeting directed staff to develop a Climate and Environmental Action Plan that exceeds the state goals. Concurrently, the General Plan is being updated to include strategies and recommendations related to climate change mitigation.

Identified strategies for greenhouse gas mitigation efforts Medium Comment: Staff has drafted green-house gas mitigation strategies after hosting four stakeholder meetings and additional community events to receive recommendations and input from the public.

Identified strategies for adaptation to impacts Medium
Comment: Staff has drafted the strategies now after hosting four stakeholder meetings and additional community events to receive recommendations and input from the public.

Champions for climate action in local government departments Medium Comment: The City Public Works Department established an internal green team of employees from City departments to assist in the development and rollout of internal green policies.

Political support for implementing climate change adaptation strategies Medium Comment: The City Council adopts goals annually and environmental leadership is always included as shown by the following goal. “Provide and enhance essential infrastructure to ensure the goals and policies of the City’s General Plan are carried out and the City retains its role and reputation as a leader in protecting the environment and preserving limited natural resources.” The City Council also approved participation in the Clean Power Alliance at the 100% renewable level which dramatically lowered GHG emissions.

Financial resources devoted to climate change adaptation Medium Comment: The City is supportive of cost-effective environmental initiatives.

Local authority over sectors likely to be negative impacted Low Comment: The City has local authority over housing, water resources and land use issues. 818
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 10-10
Criterion
Jurisdiction
Ratinga
Public Capacity
Local resident’s knowledge of and understanding of climate risk Medium Comment: Thousand Oaks residents and business owners are knowledgeable and engaged.

Local resident’s support of adaptation efforts Medium
Comment: Thousand Oaks residents are informed and active on climate and environmental issues.

Local resident’s capacity to adapt to climate impacts Medium Comment: The City’s Climate & Environmental Action Plan documents residents’ interests and priorities.

Local economy current capacity to adapt to climate impacts Medium Comment: Many residents have the resources to make GHG reduction and resiliency reduction measures at home. However, Thousand Oaks also has an aging population with many seniors on a fixed income and unable to complete home improvements on their own.

Local ecosystems capacity to adapt to climate impacts Unsure Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.

10.5 INTEGRATION REVIEW
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as general planning and capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed at the end of this annex were used to provide information on integration. The progress reporting process described in Volume 1 of the hazard mitigation plan will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration.

10.5.1 Existing Integration
Integration has been established between local hazard mitigation planning and the following local plans and programs:

City Emergency Operations Plan—Adopted in 2020, this Plan describes the City’s preparedness, response, mitigation and recovery from local and national emergency incidents City General Plan—Scheduled for adoption in FY 2022-23, this Plan describes the long-term goals, policies and development of Thousand Oaks, including a Safety Element that addresses hazard mitigation.

City Climate & Environmental Action Plan—Scheduled for adoption in FY 2022-23, this Plan describes the City’s on-term strategies for reducing greenhouse gas emissions, reduce air pollution and improve public health.

Building Code—The City routinely updates the Thousand Oaks Municipal Code (TOMC) and as part of a review of the hazard mitigation in the Building Section of the TOMC.

Stormwater Management—The City is part of a Countywide Stormwater Pollution Management Plan and when possible the Cities and County of Ventura collaborate upon local stormwater management with hazard mitigation policies.
819

10. City of Thousand Oaks
10-11
Post-Disaster Recovery—The City addresses disaster recovery in its Emergency Operations Plan (EOP), which includes hazard mitigation as part of the Plan.

Growth Management—The General Plan addresses future growth in Thousand Oaks and during the update, hazard mitigation is incorporated into the final Plan.

Site Plan Review—The Community Development Department and the Public Works Department jointly consider hazard mitigation issues as part of each project review.

Environmental Protection—Hazard mitigation is part of the City’s review of programs, policies and projects as they relate to land, air, water and waste.

Flood Damage Protection—All existing and proposed development projects are reviewed to address existing and future hazards.

Disaster Debris Plan—The County has a Disaster Debris Plan and the City addressees’ disaster debris in its Emergency Operations Plan in addition to hazard mitigation.

Floodplain Management—The City EOP addresses flooding as well as the TOMC which is updated routinely
Urban Watershed Plan—As part of a 2021 update, urban watershed policies and the City’s program was updated, and hazard mitigation issues are part of that review.

Wildfire Protection Plan—The City’s EOP includes a wildfire protection element that includes hazard mitigation.

Forest Management Plan—The 2017 adopted plan addresses City-maintained plantings, background, design and management. Hazard mitigation will continue to be part of the Plan.

10.5.2 Opportunities for Future Integration
The capability assessment in this annex indicates opportunities to integrate this mitigation plan with other jurisdictional planning/regulatory capabilities. Capabilities were identified as integration opportunities if they can support or enhance the actions identified in this plan or be supported or enhanced by components of this plan. The capability assessment identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future:

Countywide Stormwater Pollution Control Plan—This Plan describes how the Cities and County of Ventura will reduce pollution of local waterways. The integration of this Plan with hazard mitigation includes a review of policies and programs of both plans to ensure consistency and compliance.

Urban Water Management Plan -This Plan describes the City’s long-term water resource and planning principles for reducing water use. The integration of this Plan with hazard mitigation includes a review of policies and programs of both plans to ensure consistency and compliance.

Economic Development Strategic Plan—This Plan was developed as a policy guide for guiding the City’s short, medium and long-term economic development planning. The integration of this Plan with hazard mitigation includes a review of policies and programs of both plans to ensure consistency and compliance.

Acting to integrate each of these programs with the hazard mitigation plan was considered as a mitigation action to include in the action plan in this annex. 820
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 10-12

10.6 RISK ASSESSMENT

10.6.1 Jurisdiction-Specific Natural Hazard Event History Table 10-11 lists past occurrences of natural hazards for which specific damage was recorded in this jurisdiction Other hazard events that broadly affected the entire planning area, including this jurisdiction, are listed in the risk assessments in Volume 1 of this hazard mitigation plan.

Table 10-11.Past Natural Hazard Events
Type of Event FEMA Disaster # Date Damage Assessment
Wind/PSPS Event N/A 1/20 $2 million
Hill Fire DR 4407 11/8/18 -11/9/18 $1 million
Woolsey Fire DR 4407 11/8/18-11/9/18 $8 million
Borderline Active Shooter N/A 11/18/18 $5 million
Winter Storm Event DR 4353 12/4/17- 1/31/18 $2 million
Springs Fire DR 5024 5/2/13–5/11/13 $10 million
Wildwood I Fire N/A 1995 $ 500,000
Northridge Earthquake DR1008 1/17/94 $6 million
Green Meadow Fire N/A 10/26/93 – 11/3/93 $12 million
Sherwood Fire N/A 1985 $ 1 million
Dayton Canyon Fire N/A 10/25/82 $4 million
Winter Storm Event N/A 2/21/80 $2 million
Winter Storm Event N/A 2/15/78 $1.5 million
Winter Storm Event N/A 1/26/69 $200,000
Winter Storm Event N/A 12/7/65 $100,000
Wind/PSPS Event N/A 1/20 $2 million

10.6.2 Hazard Risk Ranking
Table 10-12 presents a local ranking of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property, and the economy. Mitigation actions primarily target hazards with high and medium rankings.

Table 10-12.Hazard Risk Ranking
Rank Hazard Risk RankingScore Risk Category
1 Landslide 51 High
2 Wildfire 36 High
3 Earthquake 32 Medium
4 Severe Storm 24 Medium
5 Severe Weather 24 Medium
6 Flooding 18 Medium
7 Dam Failure 12 Low
8 Drought 9 Low
821

10. City of Thousand Oaks
10-13

10.6.3 Jurisdiction-Specific Vulnerabilities
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. This section provides information on a few key vulnerabilities for Thousand Oaks. Available Thousand Oaks-specific risk maps of the hazards are provided at the end of this annex.

Repetitive Loss Properties
Repetitive loss records are as follows:

Number of FEMA-identified Repetitive-Loss Properties: 5 Number of FEMA-identified Severe-Repetitive-Loss Properties: N/A Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties mitigated: N/A Other Noted Vulnerabilities
The following jurisdiction-specific issues have been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources:

Urban Area Flooding—Urban area flooding of specific neighborhoods in Thousand Oaks is an ongoing hazard that continues to be addressed through the City’s Capital Improvement Program. The Public Works Department has identified hazard priorities and through City, State and Federal funding resources, many of the known hazards are being mitigated. Each project includes a public outreach component before, during and after the completion of each project.

Power Outages—Scheduled and un-scheduled SCE power outages continue to be a hazard in Thousand Oaks, especially during excessive heat and wind. The Public Works Department has implemented a Red Flag-PSPS Policy that includes the use of permanent and portable back-up generators at critical City facilities. The City also encourages residents and business owners to secure back-up power.

Mitigation actions addressing these issues were prioritized for consideration in the action plan in this annex.

10.7 STATUS OF PREVIOUS PLAN ACTIONS
Table 10-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared.

10.8 HAZARD MITIGATION ACTION PLAN
Table 10-14 lists the identified actions, which make up the hazard mitigation action plan for this jurisdiction. Table 10-15 identifies the priority for each action. Table 10-16 summarizes the mitigation actions by hazard of concern and mitigation type.
822
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 10-14
Table 10-13.Status of Previous Plan Actions
Removed;
Carried Over to Plan
Update
Action Item Completed
No Longer
Feasible
Check if
Yes
Action # in
Update
TO 1—Develop a water conservation public outreach program to increase awareness about the drought, fines and penalties for overuse and methods for conserving water.

Comment:The Public Works Department developed a public outreach program over the last decade that includes a monthly e- newsletter to over 10,500 recipients and use of Facebook, Instagram and Twitter. The Sustainability Division in the Public Works Department maintains the City’s Water webpage which provides updates related to drought conditions, fines and penalties for overuse and strategies for conserving water. The City finished its Automatic Meter Reader Upgrade in June 2021 which provides customer access to water consumption data and monitoring of customer water leaks. The City’s annual Arbor/Earth Day event includes water conservation booths from all three local water purveyors. During periods of significant water shortage, the City hosts monthly meetings with the three local water purveyors to coordinate programs and messaging. The City is also a member of the California Data Collaborative and has access to a dashboard that identifies high water users in Thousand Oaks that have accepted water rebates. Currently the City is preparing a Climate and Environmental Action Plan, which includes a water conservation component. The planis being developed in conjunction with an update to the City’s General Plan and it will be CEQA qualified. Several stakeholder meetings were held in 2021 and the Plan is expected to be considered by the City Council in 2023.

TO 2—Adopt emergency water conservation measures and/or water conservation ordinance to reduce irrigation.

Comment:The City’s Urban Water Management Plan (UWMP) was adopted by City Council in June 2021.Municipal code update conservation measures (3 tier to 6 tier) November 2021. Update of water conservation levels from 3 to 6 tiers with Water Shortage Contingency Plan and municipal code updates.

TO 3—Evaluate City bridges for structural, seismic, functional, and safety adequacy.

Comment:Caltrans performs biennial evaluation of all City and State’s bridges for structural, seismic, functional and safety adequacy.

Caltrans provides inspection reports and repair and maintenance recommendations for each bridge that was inspected. In November 2020 Caltrans inspected City of Thousand Oaks bridges and rated them to indicate deficiencies, structural adequacy, safe load carrying capacity and general condition.

TO 4—Update Supervisory Control and Data Acquisition (SCADA) Master Plan with seismic improvements, including design, integration of new Programmable Logic Controllers and communication systems at City pump stations, reservoirs, and turnouts.

Comment:CI 5284 SCADA Upgrades—New SCADA program, update of seismic equipment programmable logic controllersand programing. New communications system. Project completion target date: June 2022.

TO 5—Remove and/or repair the interior of reservoir tanks and perform analysis, identify causes, and mitigate hazards to ensure tanks achieve seismic standards.

Comment:Water reservoirs are inspected and cleaned every 5 years and rehabilitated every 20-25 years. Rehabilitation project priorities include 2019 Lang Ranch Reservoir, 2020 Tara Reservoir Seismic upgrades, ventilation and structural safety were addressed at these sites and all reservoir rehabilitation projects. As part of CIP 5284, SCADA Upgrades 823

10. City of Thousand Oaks
10-15
Table 10-14.Hazard Mitigation Action Plan Matrix
BenefitsNew or
Existing AssetsObjectives Met Lead Agency Support Agency Estimated
Cost Sources of FundingTimelinea
Action CTO-1—Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or located in high- or medium-risk hazard areas.

Hazards Mitigated:Landslides, Wildfire, Earthquake, Severe Storms, Severe Weather, Flooding, Dam Failure New & Existing4, 6, 8, 9, 10, 11, 19 City Public Works
Department
City Community
Development Department
High Grant
Funding- FEMA HMA
(BRIC, FMA, HMGP)
Ongoing
Action CTO-2—Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community, including Urban Water Management Plan, General Plan Update, Climate & Environmental Action Plan Hazards Mitigated Flooding, Earthquakes, Climate Change New & Existing 4, 8, 9, 11, 19 City Public Works
Department
City Community
Development Department
Low Staff Time, General
Fund
Ongoing
Action CTO-3—Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.

Hazards Mitigated:Landslides, Wildfire, Earthquake, Severe Storms, Severe Weather, Flooding, Dam Failure, Drought New & Existing 9, 10, 11 City Public Works
Department
City Community
Development Department
Low Staff Time, General
Fund
Short-term
Action CTO-4—Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements that include enforcing the City flood damage prevention ordinance, participate in floodplain identification and mapping updates, and provide public assistance/information on floodplain requirements and impacts.

Hazards Mitigated:Flooding
New & Existing8, 9, 10, 13, 14, 15, 19 Public Works Ventura County Water Protection District
Low Staff Time, General
Fund
Ongoing
Action CTO-5—Identify and pursue strategies to increase adaptive capacity to climate change including but not limited to the following projects:

CI 5395, Groundwater Utilization Project—Alternative source of water.

CI 5450, Emergency Water Interconnects—2 new interconnects with California American Water Service (Adrian Drive& Avenida de los Arboles).

Hazards Mitigated:Drought,Earthquake
New & Existing 1, 13, 14,19 City Public Works
Department
Low Staff Time, General
Fund
Short-term
Action CTO-6—Purchase generators for critical facilities and infrastructure that lack adequate backup power, including the following projects:

CI 5292, La Granada Reservoir Improvements—Redundant supply pumps, emergency fire pump (Pump #3) and emergency backup generator installed at La Granada Reservoir.

CI 5454, Pressure Reducing Stations—1 new PRS & existing upgrade. Water supply redundancy, reduced pumping.

CI 5452, Lone Oak Emergency Generator—Install new generator at Lone Oak Pump Station with an automatic transfer switch and connection to SCADA System.

CI 5520, Site Improvements at Reservoir and Pump Stations—Erbes Road Emergency backup generator.

Hazards Mitigated:Dam Failure, Earthquakes, Flooding, Landslide, Severe Weather,Wildfires New and Existing 2, 8, 10, 19 City Public Works
Department
Community Development
Department
Grant
Funding- FEMA HMA
(BRIC, FMA, HMGP)
Short-term
824
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 10-16
BenefitsNew or
Existing AssetsObjectives Met Lead Agency Support Agency Estimated
Cost Sources of FundingTimelinea
Action CTO-7—Maintain wildfire hazard fuel reduction program for areas that have been identified with overgrown or dead brush, trees and weeds to reduce the potential for tree-to-tree ignition. Ensure that a “maintenance now” component to provide continued fire resistance is part of the program. (Coordinates with Ventura County Fire Protection District Action VFP-6 and Conejo Recreation and Parks District Action CRP-1)
Hazards Mitigated:Wildfire
New & Existing2,4,5,6,8,10,11,
13, 14, 15, 18, 19
VCFPD City of Thousand Oaks,
COSCA (Conejo Open
Space Conservancy
Agency), Conejo
Recreation and Parks
District (CRPD), CAL FIRE
& USDA
Medium Grant
Funding- FEMA HMA
(BRIC, FMAP and
HMGP), Staff Time &
General Funds
Ongoing
Action CTO-8—The City is developing plans to install two City Hall emergency power battery backup systems. Two other emergency backup power systems include the Erbes Road Pump Station Battery Back-Up Project and the Pederson Battery Back Up Project. Both projects are funded by state HMGP funding.

Hazards Mitigated:Landslides, Wildfire, Earthquake, Severe Storms, Severe Weather, Flooding, Dam Failure New and Existing 1, 6, 11, 19 City Public Works
Department
VCPWA-WP Low Grant
Funding- FEMA HMA
(BRIC, FMA, HMGP)
and General Fund
Short-term
Action CTO-9—The Lake Eleanor (Banning) Dam was built in 1889 is operated by COSCA and is 37 feet high and has a storage capacity of 128-acre-feet. Dam failure would be a flood risk for the Westlake community and has a sentiment load that cannot be released downstream. The reduction of water storage volume would help mitigate the hazard potential of the Dam.

Hazards Mitigated:Dam Failure, Earthquakes, Flooding, Severe Weather New and existing 4, 5, 8, 9, 11, 14, 15,
16, 17, 19
City Public Works
Department
COSCA, CRPD Low Grant
Funding- FEMA HMA
(BRIC, FMA, HMGP)
Long
Term
Action CTO-10—Community outreach program for wildfire safety. Home losses associated with wildfires. COSCA contracts with the Ventura Regional Fire Safe Council to provide educational outreach and services promoting wildfire safety. These include webinars on fire safety, defensible space, and home hardening. Also offered are Home Ignition Zone assessments for homeowners in COSCA’s service area. Currently, these are funded through COSCA Board appropriations for funding from COSCA’s Woolsey Fire Recovery Fund.

Hazards Mitigated:Wildfire
New and Existing1, 5, 8, 11, 14, 17City Community
Development
COSCA, CRPD Low Grant
Funding- FEMA HMA
(BRIC, FMAP and
HMGP), Cal-OES &
Utility Settlement
Ongoing
Action CTO-11—Westlake Boulevard Flood Damage Mitigation. Install retaining walls and upgrade the drainage inlet along the west side of Westlake Boulevard at Cloverleaf Street to mitigate debris and mud flows from adjacent hillsides from entering the roadway.

Hazards Mitigated:Dam Failure, Earthquakes, Flooding, Severe Weather.

New and Existing4, 14, 11, 15, 16, 19City Public Works
Department
N/A Medium General Fund, Grant
Funding- FEMA HMA
(BRIC, FMAP and
HMGP)
Ongoing
825

10. City of Thousand Oaks
10-17
BenefitsNew or
Existing AssetsObjectives Met Lead Agency Support Agency Estimated
Cost Sources of FundingTimelinea
Action CTO-12-Continue implementation of City Drainage Protection Program. Positive drainage away from structures is achieved in accordance with the City’s adopted building codes development discharges to be safely conveyed to stable channels and/or dispersed into natural channels via energy dissipators/rip-rap to avoid scour of unstable areas in accordance with TOMC 1995-20 Section 4 (Commercial/Industrial) and Section 5 (Residential).

Hazards Mitigated:Dam Failure, Earthquake, Flooding, Severe Weather New and Existing1, 11, 15, 16, 19City Public Works
Department
City Community
Development Department
Low General Fund Ongoing
Action CTO-13—Continue to participate in Countywide FEMA Coordination by meeting quarterly to discuss program enhancements, studies, and other floodplain matters.

Hazards Mitigated:Flooding
New and Existing 1, 8, 10, 13 City Public Works
Department
N/A Low General Fund Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date
Acronyms used here are defined at the beginning of this volume.

Table 10-15.Mitigation Action Priority
Action #
# of
Objectives
Met BenefitsCosts
Do Benefits
Equal or
Exceed Cost?
Is Project
Grant-
Eligible?
Can Project Be Funded
Under Existing
Programs/ Budgets?
Implementation
Prioritya
Grant
Pursuit
Prioritya
1 7 High High Yes Yes No High High
2 5 High Low Yes No Yes High Low
3 3 MediumMedium Yes No Yes Medium Low
4 7 High Low Yes No Yes Low Low
5 4 High Medium Yes No Yes Medium Low
6 4 High Medium Yes Yes Yes Medium High
7 12 High Low Yes Yes Yes High High
8 4 Medium High Yes Yes No Medium Medium
9 10 High Low Yes Yes Yes High High
10 6 Low Low Yes Yes Yes Low Medium
11 5 Medium Low Yes Yes Yes Low Medium
12 5 Low Low Yes No Yes Low Low
13 4 Low Low Yes No Yes Low Low
a. See the introduction to this volume for explanation of priorities. 826
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 10-18
Table 10-16.Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard
Type Prevention
Property
Protection
Public
Education &
Awareness
Natural
Resource
Protection
Emergency
Services
Structural
Projects
Climate
Resilience
Community
Capacity
Buildingb
High-Risk Hazards
Landslide CTO-6, 11 CTO-1, 2, 6 CTO-1, 3, 5 CTO-6,8 CTO-5, 6, 8 CTO-1, 5 CTO-3, 8 Wildfire CTO-
6, 7, 8, 10
CTO-
1, 3, 6, 7, 10
CTO-
7, 10
CTO-
1, 7
CTO-6,8,
10 CTO-3, 6, 7 CTO-10 CTO-3, 7, 10
Medium-Risk Hazards
EarthquakeCTO-2, 3, 6, 8, 9 CTO-1, 2, 6,
8, 9
CTO-5, 10 CTO-1, 2, 5, 9,
11, 12
CTO-1, 2, 6,
8, 9
CTO-1, 2, 3,
8, 9, 12
CTO-5, 7,
9, 11
CTO-1, 2, 3,
8, 12
Severe
Storms
CTO-3, 6, 8, 11 CTO-1, 3, 6,
8 CTO-1 CTO-8 CTO-1, 6, 8 CTO-1, 3, 6
Severe
Weather
CTO-3, 6, 9, 11,
12 CTO-1, 6, 9,
11, 12
CTO-10, 13 CTO-1, 9, 12 CTO-1, 6, 8,
11 CTO-1, 6, 8,
11, 12
CTO-9 CTO-1, 3, 9,
12 Flooding CTO-2, 3, 4 CTO-1, 2, 4,
8, 9
CTO-7, 11 CTO-1, 2, 9,
11, 12
CTO-6, 8,
11, 12
CTO-1, 2, 6,
8, 9, 11, 12
CTO-2, 9,
11, 12, 13
CTO-1, 2, 3,
4, 9, 12, 13
Low-Risk Hazards
Dam
Failure
CTO-11, 12 CTO-1, 3, 6,
8, 9, 11, 12
CTO-9 CTO-1, 8, 9 CTO-1, 6, 8 CTO-1, 6,
11, 12
CTO-8, 9 CTO-1, 3, 6,
8 Drought CTO-5 CTO-5 CTO-3
a. See the introduction to this volume for explanation of mitigation types. b. Note that the jurisdiction did not identify a need for expansion of financial capabilities, based on existing capabilities. The intent of this hazard mitigation plan is to expand the financial capability of the jurisdiction.

10.9 PUBLIC OUTREACH
Table 10-17 lists public outreach activities for Thousand Oaks which includes citywide communications and civic engagement activities for City departments, the press, and community members. Public outreach includes:

City Websites
Social Media
Emergency Communications
Media Relations
Citywide Branding
Press Releases
Community Relations
City Newsletters
TOTV—Government Access Television
Community Attitude Survey
827

10. City of Thousand Oaks
10-19
Table 10-17.Local Public Outreach
Local Outreach Activity Date
Number of People
Involved
City Emergency Management E-Newsletter 6/29/21 1,100 subscribers City Sustainability E-Newsletter & Blog 6/29/21 10,400 subscribers City Scene E-Newsletter 7/1/21 1,500 subscribers
Hazard Mitigation Description/Survey Link on City Website 7/1/21 N/A Chamber of Commerce E-Newsletter 8/21/21 2,500 subscribers American Public Works Association, Ventura County Chapter 8/22/21 900 subscribers

10.10 INFORMATION SOURCES USED FOR THIS ANNEX
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex.

Thousand Oaks Municipal Code—The municipal code was reviewed for the full capability assessment and for identifying opportunities for action plan integration.

Emergency Operations Plan—The EOP was reviewed for the full capability assessment and for identifying opportunities for action plan integration.

Thousand Oaks General Plan—This plan is being updated and is scheduled to be adopted by the City in FY 2022-23. Several sections of the Plan, including the Safety Element and its relation to the Climate and Environmental Action Plan were referenced in this Hazard Mitigation Plan.

Climate Action & Environmental Plan—This plan was reviewed for the full capability assessment and for identifying opportunities for action plan integration.

The following outside resources and references were reviewed:

Hazard Mitigation Plan Annex Development Toolkit—The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan.

10.11 ADDITIONAL COMMENTS
The City transitioned to a new solid waste hauler (Athens) on January 1, 2022.The new residential and commercial hauler provides improved collection services and has added organics collection and composting. In addition, Athens offers pickup of household hazardous waste (HHW) from residences citywide. A new service that will reduce illegal HHW disposal and improve the City’s recovery of unwanted chemicals out of the waste stream and homes.

The addition of residential HHW curbside supplements the existing City HHW facility at 2010 Conejo Center Drive, which offers free drop-off of HHW to Thousand Oaks residents and unincorporated county residents every Friday 9 am – 1 pm. Small businesses also use the facility 1-3 pm and pay for the cost of disposal further reducing the illegal disposal of toxic chemicals into the waste stream.

In November 2021 the City adopted a Water Shortage Contingency Ordinance and Resolution for a 15 percent voluntary water conservation level.
828
Moorpark
Simi Valley
Camarillo
Thousand Oaks
118
23 23
23 1
34 23
118
23 101
Food, Water, Shelter
Health and Medical
Safety and Security
Major Roads
Selected City
Incorporated Cities
County Boundary
Data Sources: Ventura Co., VCFD,
Casitas MWD, Calleguas MWD,
City of Camarillo, CA Energy
Commission, Cal Trans, EPA,
HIFLD, Esri
Thousand Oaks
Critical Facilities (1 of 2)
0 1.5 30.75 Miles
829
Moorpark
Simi Valley
Camarillo
Thousand Oaks
118
23 23
23 1
34 23
118
23 101
Communications
Energy
Hazardous Material
Transportation
Major Roads
Selected City
Incorporated Cities
County Boundary
Data Sources: Ventura Co., VCFD,
Casitas MWD, Calleguas MWD,
City of Camarillo, CA Energy
Commission, Cal Trans, EPA,
HIFLD, Esri
Thousand Oaks
Critical Facilities (1 of 2)
0 1.5 30.75 Miles
830
Moorpark
Simi Valley
Camarillo
Thousand Oaks
118
23 23
23 1
34 23
118
23 101
Data Sources: Ventura Co.,
CA DWR, Esri
Thousand Oaks
Dam Failure
Inundation Areas
0 1.5 30.75 Miles
Combined Inundation
Areas
Major Roads
Selected City
Incorporated Cities
County Boundary
831
Moorpark
Simi Valley
Camarillo
Thousand Oaks
118
23 23
23 1
34 23
118
23 101
Data Sources: Ventura Co.,
CGS, Esri
Thousand Oaks
NEHRP Soil Class
0 1.5 30.75 Miles
C (Dense soil/soft rock)
D (Stiff soil)
Major Roads
Selected City
Incorporated Cities
County Boundary
832
Moorpark
Simi Valley
Camarillo
Thousand Oaks
118
23 23
23 1
34 23
118
23 101
Data Sources: Ventura Co.,
Esri
Thousand Oaks
Liquefaction Susceptibility
0 1.5 30.75 Miles
Liquefaction zone
Major Roads
Selected City
Incorporated Cities
County Boundary
833
Moorpark
Simi Valley
Camarillo
Thousand Oaks
118
23 23
23 1
34 23
118
23 101
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Thousand Oaks
100-Year Probabilistic
Earthquake Scenario
0 1.5 30.75 Miles
Mercalli Intensity Scale
VII (Very Strong/Moderate)
Major Roads
Selected City
Incorporated Cities
County Boundary
834
Moorpark
Simi Valley
Camarillo
Thousand Oaks
118
23 23
23 1
34 23
118
23 101
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Thousand Oaks
Oak Ridge M7.16
Earthquake Scenario
0 1.5 30.75 Miles
Mercalli Intensity Scale
VI (Strong/Light)
VII (Very Strong/Moderate)
VIII (Severe/Moderate-Heavy)
Major Roads
Selected City
Incorporated Cities
County Boundary
835
Moorpark
Simi Valley
Camarillo
Thousand Oaks
118
23 23
23 1
34 23
118
23 101
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Thousand Oaks
Pitas Point M7.12
Earthquake Scenario
0 1.5 30.75 Miles
Mercalli Intensity Scale
V (Moderate/Very Light)
VI (Strong/Light)
VII (Very Strong/Moderate)
VIII (Severe/Moderate-Heavy)
Major Roads
Selected City
Incorporated Cities
County Boundary
836
Moorpark
Simi Valley
Camarillo
Thousand Oaks
118
23 23
23 1
34 23
118
23 101
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Thousand Oaks
San Cayetano M7.16
Earthquake Scenario
0 1.5 30.75 Miles
Mercalli Intensity Scale
VI (Strong/Light)
VII (Very Strong/Moderate)
Major Roads
Selected City
Incorporated Cities
County Boundary
837
Moorpark
Simi Valley
Camarillo
Thousand Oaks
118
23 23
23 1
34 23
118
23 101
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
Thousand Oaks
S. San Andreas M8.03
Earthquake Scenario
0 1.5 30.75 Miles
Mercalli Intensity Scale
V (Moderate/Very Light)
VI (Strong/Light)
Major Roads
Selected City
Incorporated Cities
County Boundary
838
Moorpark
Simi Valley
Camarillo
Thousand Oaks
118
23 23
23 1
34 23
118
23 101
Data Sources: Ventura Co.,
FEMA, Esri
Thousand Oaks
FEMA Flood Hazard Areas
0 1.5 30.75 Miles
1% Annual Chance
Flood (100-Year)

0.2% Annual Chance
Flood (500-Year)
Major Roads
Selected City
Incorporated Cities
County Boundary
839
Moorpark
Simi Valley
Camarillo
Thousand Oaks
118
23 23
23 1
34 23
118
23 101
Data Sources: Ventura Co.,
CGS, Esri
Thousand Oaks
Susceptibility to
Deep-Seated Landslides
0 1.5 30.75 Miles
Low
Moderate
High
Very High
Major Roads
Selected City
Incorporated Cities
County Boundary
840
Moorpark
Simi Valley
Camarillo
Thousand Oaks
118
23 23
23 1
34 23
118
23 101
Data Sources: Ventura Co.,
CAL FIRE, Esri
Thousand Oaks
Wildfire Hazard
Severity Zones
0 1.5 30.75 Miles
Moderate
High
Very High
Major Roads
Selected City
Incorporated Cities
County Boundary
841
11-1

11. CITY OF VENTURA

11.1 LOCAL HAZARD MITIGATION PLANNING TEAM
Primary Point of Contact Alternate Point of Contact
Daniel Wall, Emergency Services Manager
501 Poli St.

Ventura, CA 93001
Telephone: 805-223-1030
email: [email protected]
Barry Fisher, Deputy City Manager
501 Poli St.

Ventura, CA 93001
Telephone: 805-223-6873
Email: [email protected]
This annex was developed by the local hazard mitigation planning team, whose members are listed in Table 11-1.

Table 11-1.Local Mitigation Planning Team Members
Name Title
Peter Gilli Director, Community Development
Neda Zayer Deputy Director, Community Development
Jonathan Wood Permit Services Manager, Planning Development Phil Nelson Director, Public Works
Mary Joyce Ivers Deputy Director, Public Works
Jeff Hereford Principal Civil Engineer
Cody Stults Environmental
Susan Rungren General Manager Ventura Water
Linda Sumansky Director, Ventura Water Pure
Brett Reed Fire Marshal, Ventura Fire Department

11.2 JURISDICTION PROFILE

11.2.1 Location and Features
The city of San Buenaventura is in Ventura County, California. The boundaries generally extend from Santa Barbara to Los Angeles along state route 101, the city, encompassing an area of 32.09 square miles. A California coastal community with its phenomenal climate, friendly people and spectacular coastline make Ventura a locale for those who appreciate and enjoy the outdoors. 842
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 11-2

11.2.2 History
Ventura is a coastal City, set against undeveloped hills and flanked by two free-flowing rivers, has been inhabited for thousands of years. Originally European explorers encountered the Chumash, while traveling along the Pacific coast. They witnessed the ocean navigation skill of the native people and their use of the abundant local resources from sea and land. In 1782, the eponymous Mission San Buenaventura was founded nearby, where it benefitted from the water of the Ventura River. The town grew around the mission compound and incorporated in 1866. The development of nearby oil fields began in the 1920s during which many designated landmark buildings were constructed. The mission and these buildings are at the center of a downtown that have become a cultural, retail, and residential district and visitor destination.

11.2.3 Governing Body Format
There are 7 members of the Ventura City Council, each serving a four-year term. Starting with the 2018 Election, four (4) Councilmembers were elected by Districts with the remaining three (3) Councilmembers elected by Districts in 2020. While elected by Districts, each member represents the interests of the City as a whole. The Ventura City Council assumes responsibility for the adoption of this plan; City Administration will oversee its implementation.

11.3 CURRENT TRENDS

11.3.1 Population
According to the California Department of Finance, the population of Ventura as of January 2020 was 106,276. Since 2010, the population has decreased at an average annual rate of 0.09 percent.

11.3.2 Development
Development trends in the City of Ventura are focused on infill development, versus new land/hillside development. The City is looking towards main corridors for increased density and mixed-use development to accommodate the balance of residential and commercial needs. Adaptative reuse of industrial properties is also being considered for last mile distribution centers. Increase housing demands with available property will likely result in more multi-family projects. More flexible zoning will increase commercial and industrial development.

Table 11-2 summarizes development trends in the period since the preparation of the previous hazard mitigation plan, as well as expected future development trends.

11.4 CAPABILITY ASSESSMENT
This section describes an assessment of existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning. 843

11. City of Ventura
11-3
Table 11-2.Recent and Expected Future Development Trends Criterion Response
Has your jurisdiction annexed any land since
the preparation of the previous hazard
mitigation plan?
No
Is your jurisdiction expected to annex any
areas during the performance period of this
plan?
Yes
If yes, describe land areas and dominant
uses.

A25.37-acre property located at the western terminus of Thille Street, just east of the Highway 101/ Highway 126 interchange and 75-acre property adjacent to Valentine road.

If yes, who currently has permitting authority
over these areas? County of Ventura
Are any areas targeted for development or
major redevelopment in the next five years? Yes
If yes, briefly describe, including whether any
of the areas are in known hazard risk areasMost of the redevelopment is occurring within the downtown area and the major corridors such as Main Street and Thompson Blvd. The projects are occurring on infill sites that are building multi-story mixed use or residential projects. Some of the development in the downtown area is close to fault lines. Most of the redevelopment areas are generally outside of the high fire areas.

How many permits for new construction were
issued in your jurisdiction since the
preparation of the previous hazard mitigation
plan?
2016 2017 2018 2019 2020
Single Family 56 255 60 7 4
Multi-Family 31 59 11 14 36
Other (commercial, mixed use, etc.)1 1 5 0 4
Total 88 315 76 21 44
Provide the number of new-construction
permits for each hazard area or provide a
qualitative description of where development
has occurred.

Special Flood Hazard Areas: 36
Landslide: 12
High Liquefaction Areas: 62
Tsunami Inundation Area: 21
Wildfire Risk Areas: 398
Describe the level of buildout in the
jurisdiction, based on your jurisdiction’s
buildable lands inventory. If no such
inventory exists, provide a qualitative
description.

Development trends in the City of Ventura are focused on infill development, (versus new land/hillside development). Looking towards main corridors for increased density and mixed-use development to accommodate to balance residential and commercial needs. Adaptative reuse of industrial properties for last mile distribution. Increase housing demands with available property will likely result in more multi-family projects.

More flexible zoning will increase commercial and industrial development.

Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table in this annex identifies these as community capacity building mitigation actions.

The findings of the assessment are presented as follows:

An assessment of planning and regulatory capabilities is presented in Table 11-3.

Development and permitting capabilities are presented in Table 11-4.

An assessment of fiscal capabilities is presented in Table 11-5. 844
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 11-4
An assessment of administrative and technical capabilities is presented in Table 11-6.

An assessment of education and outreach capabilities is presented in Table 11-7.

Information on National Flood Insurance Program (NFIP) compliance is presented in Table 11-8.

Classifications under various community mitigation programs are presented in Table 11-9.

The community’s adaptive capacity for the impacts of climate change is presented in Table 11-10.

Table 11-3.Planning and Regulatory Capability
Local
Authority
Other Jurisdiction
Authority
State
Mandated
Integration
Opportunity?
Codes, Ordinances, & Requirements
Building Code Yes Yes Yes Yes
Comment:Sec. 12.115.010, Adoption of California Building Code, 2019 Edition. (Ord. No. 2019-011, § 2, 10-7-19) Zoning Code Yes Yes Yes Yes
Comment:Division 24 of the Municipal Code (Code 1971, updated numerous times, last updated Ord. No. 2020-021, § 1, 8-3-2020) Subdivisions Yes Yes Yes Yes
Comment:Division 26 of the Municipal Code (Code 1971, § 8211 through 8231.18, updated numerous times, last updated Ord. No. 2015-006, 6-8-15)
Stormwater Management Yes Yes Yes Yes
Comment:Chapter 8.600, Stormwater Quality Management Ordinance 99-1 adopted 1-11-99 Post-Disaster Recovery Yes Yes Yes Yes
Comment:Emergency Management Sec. 2.370.080., Emergencyresponse May 2021 Real Estate Disclosure Yes No Yes Yes
Comment:Division 24 of the Municipal Code (Code 1971, updated numerous times, last updated Ord. No. 2020-021, § 1, 8-3-2020) Growth Management Yes No No Yes
Comment:Save Open Space and Agricultural Resourcesinitiative adopted1995. Sec. 24.550.010(Code 1971, § 15.850.010) Site Plan Review Yes No No Yes
Comment:Division 24 of the Municipal Code (Code 1971, updated numerous times, last updated Ord. No. 2020-021, § 1, 8-3-2020) Environmental Protection Yes Yes Yes Yes
Comment:Sec. 2R.450.750(Res. No. 2002-57, § 4, 9-9-02)
Flood Damage Prevention Yes Yes Yes Yes
Comment:Floodplain Regulations, Municipal Code Part 4 Chapter 12.430 ( Ord. No. 2021-001, § 1, 1-11-21 ) Emergency Management Yes Yes Yes Yes
Comment:Emergency Management Sec. 2.370.080, Emergency response May 2021 Climate Change No No No Yes
Comment:None
Planning Documents
General Plan Yes No Yes Yes
Is the plan compliant with Assembly Bill 2140?No
Comment:Undergoing comprehensive General Plan that will bring the Plan into compliance with AB 2140 Capital Improvement Plan Yes No Yes Yes
How often is the plan updated?Annually
Comment:Current plan covers 6-year period from 2020-2026 845

11. City of Ventura
11-5
Local
Authority
Other Jurisdiction
Authority
State
Mandated
Integration
Opportunity?
Disaster Debris Management Plan No Yes Yes Yes
Comment:Ventura County Disaster Recovery Plan, Adopted by BOS in April 2019 Floodplain or Watershed Plan No Yes Yes Yes
Comment:The Ventura County Watershed Protection creates and maintains countywide plans Stormwater Plan Yes Yes Yes Yes
Comment:The City of Ventura has joined other jurisdictions to form the Ventura Countywide Stormwater Quality Management Program and is named as a co-permittee under a revised countywide municipal National Pollutant Discharge Elimination System permit for stormwater discharges issued by the Regional Water Quality Control Board in 2010 (Order R4-2010-0108) Urban Water Management Plan Yes No Yes Yes
Comment:2020 Urban Water Management Plan approved June 14, 2021 Habitat Conservation Plan Yes Yes No Yes
Comment:The city doesnot have an existing habitat plan
Economic Development Plan Yes No No Yes
Comment:Existing Gap plan developed 2018, funded Econ Dev plan request for proposalsanticipated 2022 Spring Shoreline Management Plan Yes Yes Yes Yes
Comment:General Plan.Surfers Point Managed Retreat Project Chapter 24.310, Coastal Protection (CP) Overlay Zone Community Wildfire Protection Plan Yes No Yes Yes
Comment:Current effort to develop a plan due Jan 2022
Urban Forest Management Plan Yes No No Yes
Comment:City of San Buenaventura Master Tree Plan, November 9, 2020 Climate Action Plan Yes No No No
Comment:Preparation and adoption of a Climate Action Plan is part of the comprehensive General Plan update that is scheduled to be adopted in 2023.

Comprehensive Emergency Management Plan Yes No Yes Yes
Comment:Emergency Operations Plan was published and approved May 10, 2021 Threat & Hazard Identification & Risk Assessment (THIRA)Yes No No Yes Comment:The city doesnot have acomplete THIRA.

Post-Disaster Recovery Plan Yes No Yes Yes
Comment:Incorporated intotheEOP May 2021
Continuity of Operations Plan Yes No Yes Yes
Comment:Incorporated into the EOP June 2021
Public Health Plan No Yes Yes Yes
Comment:County of Ventura Health Care Agency Public Health Emergency Response Plan (ERP), 2019 Other—Tsunami Plan No Yes Yes Yes
Comment:The County of Ventura has an existing plan that describes each City role and has been adopted locally. A revision of this document is required within the coming year 2022.

Table 11-4.Development and Permitting Capability
Criterion Response
Does your jurisdiction issue development permits? Yes
If no, who does? If yes, which department?Community Development Does your jurisdiction have the ability to track permits by hazard area? Yes Does your jurisdiction have a buildable lands inventory? No 846
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 11-6
Table 11-5.Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants Yes
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes Yes
User Fees for Water, Sewer, Gas or Electric Service Yes If yes, specify:Water, Sewer, Electrical Services fees for new construction Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds Yes
Incur Debt through Private Activity Bonds Yes
Withhold Public Expenditures in Hazard-Prone Areas No
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers Yes Table 11-6.Administrative and Technical Capability
Staff/Personnel Resource Available?
Planners or engineers with knowledge of land development and land management practicesYes If Yes, Department /Position:Community Development / Chief Building Official and Public Works / Principal Civil Engineer Engineers or professionals trained in building or infrastructure construction practices Yes If Yes, Department /Position:Public Works/ Principal Civil Engineer, Community Development/Planner/inspector Planners or engineers with an understanding of natural hazards Yes If Yes, Department /Position:Public Works/ Principal Civil Engineer, Community Development/Planner/inspector Staff with training in benefit-cost analysis Yes
If Yes, Department /Position:Finance / Finance Director Surveyors Yes
If Yes, Department /Position:Public Works/ Surveyor
Personnel skilled or trained in GIS applications Yes
If Yes, Department /Position:Finance and Technology Department GIS/ Senior GIS Analyst Scientist familiar with natural hazards in local area No Emergency manager Yes
If Yes, Department /Position:City Manager’s Office, Emergency Services Manager Grant writers Yes
If Yes, Department /Position:City Manager’s Office and Multiple other departments 847

11. City of Ventura
11-7
Table 11-7.Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? Yes If yes, briefly describe:On our website, there are references to the County OES website wherein centralized training and outreach can be found related to hazard mitigation education.

Do you use social media for hazard mitigation education and outreach? Yes If yes, briefly describe: On our website, there are references to the County OES website wherein centralized training and outreach can be found related to hazard mitigation education.

Do you have any citizen boards or commissions that address issues related to hazard mitigation?Yes If yes, briefly describe: The city of Ventura is currently developing a CERT team Do you have any other programs in place that could be used to communicate hazard-related information? Yes If yes, briefly describe:VCALERT, EVERBRIDGE, Email, Mail and Door Knocking Do you have any established warning systems for hazard events? Yes If yes, briefly describe:VCALERT, Emergency Notification System, VCSOES, WEA system Table 11-8.National Flood Insurance Program Compliance
Criterion Response
What local department is responsible for floodplain management? Public Works Who is your floodplain administrator? (department/position) Public Works/Senior Engineer Are any certified floodplain managers on staff in your jurisdiction? Yes What is the date that your flood damage prevention ordinance was last amended?January 11, 2021 Does your floodplain management program meet or exceed minimum requirements?Meets When was the most recent Community Assistance Visit or Community Assistance Contact? 12-4-17 Thomas Fire
Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No
Are any Risk MAP projects currently underway in your jurisdiction? No If so, state what they are. FEMA has notified us that they will be studying the Ventura and Santa Clara River flooding
Do your flood hazard maps adequately address the flood risk within your jurisdiction?Yes Does your floodplain management staff need any assistance or training to support its floodplain management program?
No
Does your jurisdiction participate in the Community Rating System (CRS)? No If no, is your jurisdiction interested in joining the CRSprogram? No How many flood insurance policies are in force in your jurisdiction? a 471 What is the insurance in force?$161.828,500
What is the premium in force?$374,421
How many total loss claims have been filed in your jurisdiction? 62 What were the total payments for losses?$660,191
a. According to FEMA statistics as of March 31, 2021
848
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 11-8
Table 11-9.Community Classifications
Participating? Classification Date Classified
FIPS Code Yes 00611165042 N/A
DUNS # Yes 039974761 N/A
Community Rating System No N/A N/A
Building Code Effectiveness Grading Schedule No N/A N/A Public Protection Yes ISO3 2019
Storm Ready No N/A N/A
Firewise No N/A N/A
Tsunami Ready Yes N/A 2012
Table 11-10.Adaptive Capacity for Climate Change
Criterion
Jurisdiction
Ratings
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Low Comment:

Jurisdiction-level monitoring of climate change impacts Low Comment:

Technical resources to assess proposed strategies for feasibility and externalities Low Comment:

Jurisdiction-level capacity for development of greenhouse gas emissions inventory Medium Comment: City of Ventura has a current Greenhouse Gas inventory.

Capital planning and land use decisions informed by potential climate impacts Medium Comment: Community Development/Public Works
Participation in regional groups addressing climate risks Medium Comment: Public Works / Environmental Sustainability—The City haspartnerships with a number of regional organizations that support greenhouse gas reduction efforts, including the Ventura County Regional Energy Alliance, Clean Power Alliance, and Tri- County Regional Energy Network (3CRen). The City has also partnered with the Beach Erosion Authority for Clean Oceans and Nourishment (BEACON), Surfrider and other organizations to complete the Surfers Point Managed Retreat Project.

Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Low Comment:

Identified strategies for greenhouse gas mitigation efforts Low Comment: Draft Energy Action Plan completed in July 2021 Identified strategies for adaptation to impacts Medium
Comment:The current update to the General plan has addressed strategies for adaptation to impacts.

Champions for climate action in local government departments Low Comment: Environmental Sustainability leads the efforton behalf of the city.

Political support for implementing climate change adaptation strategies Low Comment: City of Ventura city council is supportive as well as local community-based organizationsandenvironmental organizations.

Financial resources devoted to climate change adaptation Low Comment:

Local authority over sectors likely to be negative impacted Unsure Comment:
849

11. City of Ventura
11-9
Criterion
Jurisdiction
Ratings
Public Capacity
Local residents’ knowledge of and understanding of climate risk Low Comment:

Local residents’ supportof adaptation efforts Medium
Comment: Residents are supportive of adaptation efforts, but when implementation become restrictive, they are reticent to advance the course of action.

Local residents’ capacity to adapt to climate impacts Medium Comment: The vulnerable populations within the city may not be able to relocate out of a flood-prone area (homeless encampments), but residents with more resources may be more able to rebuild, retrofit, or otherwise protect their home.

Local economy current capacity to adapt to climate impacts Medium Comment: The City has water shortage surcharge rates in addition to the base water rates.These surcharges help to fund the water budget during drought stages.

Local ecosystems capacity to adapt to climate impacts Low Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.

11.5 INTEGRATION REVIEW
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as general planning and capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future.

Resources listed at the end of this annex were used to provide information on integration. The progress reporting process described in Volume 1 of the hazard mitigation plan will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration.

11.5.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs:

City of Ventura: General Plan
City of Ventura: Emergency Operations Plan (EOP)
Ventura County: Operational Area Emergency Operations Plan

11.5.2 Opportunities for Future Integration
The capability assessment in this annex indicates opportunities to integrate this mitigation plan with other jurisdictional planning/regulatory capabilities. Capabilities were identified as integration opportunities if they can support or enhance the actions identified in this plan or be supported or enhanced by components of this plan. The capability assessment identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future:
850
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 11-10
City of Ventura: General Plan—This comprehensive effort is underway and will be integrated into this effort to be compliant with AB2140.

City of Ventura: Evacuation plan—This comprehensive effort is predicated on grant funds and will be initiated in FY20/21 and will encompass a multi-hazard perspective and routes with appropriate stakeholder/community input.

Visit Ventura: Tourist and Visitor disaster plan—This effort will be a collaboration between the following: Visit Ventura, Chamber of Commerce, Hoteliers and City Emergency Management.

City of Ventura: Citizen Emergency Response Team (CERT)—This effort will be a collaboration between the following: CERT volunteers, City staff, community-based organizations, with the existing DRAFT CERT team manual.

Taking action to integrate each of these programs with the hazard mitigation plan was considered as a mitigation action to include in the action plan in this annex.

11.6 RISK ASSESSMENT

11.6.1 Jurisdiction-Specific Natural Hazard Event History Table 11-11 lists past occurrences of natural hazards for which specific damage was recorded in this jurisdiction Other hazard events that broadly affected the entire planning area, including this jurisdiction, are listed in the risk assessments in Volume 1 of this hazard mitigation plan.

Table 11-11.Past Natural Hazard Events
Type of Event
FEMA
Disaster # Date Damage Assessment
Wind Event N/A January 19, 2021Strong surface high pressure in the Great Basin helped to generate a moderate Santa Ana wind event across Southern California.

Wildfire N/A 2020 Strong surface high pressure building in the Great Basin generated strong and gusty Santa Ana winds across sections of Ventura and Los Angeles counties.

COVID-19 DR-4482 January 20, 2020.

Continuing
Ongoing
High Wind N/A 2020 Strong surface high pressure in the Great Basin along with strong north to northeast flow aloft generated strong Santa Ana winds across Ventura and Los Angeles counties. North to northeast wind gusts up to 83 mphwere reported in the mountains while gusts to 59 mph were reported across the coastal plain.

Wildfire N/A 2019 Strong surface high pressure building in the Great Basin generated strong and gusty Santa Ana winds across sections of Ventura and Los Angeles counties.

Wind Event N/A 2018 Strong surface high pressure building in the Great Basin generated strong and gusty Santa Ana winds across sections of Ventura and Los Angeles counties. 851

11. City of Ventura
11-11
Type of Event
FEMA
Disaster # Date Damage Assessment
Winter Storm N/A 2018 Strong surface high pressure in the Great Basin helped to generate a moderate Santa Ana wind event across Southern California. Strong northeast winds were reported across the mountains and valleys of Ventura and Los Angeles Counties.

Tornado N/A 2018 A powerful winter storm brought significant rain, snow and wind to the area. Rainfall totals ranged from 1 to 2 inches across coastal and valleys areas with 2 to 4 inches in the foothills and mountains. With snow levels dropping to between 2500 and 3500 feet, significant snowfall was reported in the mountains (up to 1 to 2 feet) and even the Antelope Valley (4 to 8 inches). Numerous road closures due to winter storm conditions were reported, including Interstate 5 through the Grapevine as well as Highways 14 and 138. Additionally, thunderstorms generated a waterspout over the coastal waters as well as a very weak tornado over Ventura Harbor.

Flash Flood N/A 2018 High pressure over the four-corners region resulted in an extended monsoonal flow pattern across Southern California. For several days, strong thunderstorms produced heavy rain, flash flooding and large hail across parts of Southern California.

Debris Flow N/A 2018 A powerful early-season winter storm moves across Southwestern California on Halloween night. The storm produced some significant rainfall with amounts in the coastal areas ranging from 0.25 to 1.50 while the mountains received up to 2.00. In the Camarillo area, near the Springs burn scar, a mud/debris flow occurred.

Otherwise just some minor nuisance flooding was reported.

Wildfires,
Flooding,
Mudflows, and
Debris Flows
DR-4353 December 4, 2017-
January 31, 2018
Strong surface high pressure building in the Great Basin generated strong and gusty Santa Ana winds across sections of Ventura and Los Angeles counties. North to northeast wind gusts up to 73 mph were reported. During this event, the Thomas Fire ignited across Ventura County, eventually spreading into Santa Barbara County.

The Thomas Fire burned 500+ homes in the City of Ventura and destroyed infrastructure including roads, utilities, and utility distribution networks including telecom.

Thunderstorm N/A 2017 A powerful winter storm brought heavy rain and snow, flash flooding and gusty winds to the area. Rainfall totals from this storm generally ranged between 2 and 6 inches with locally higher amounts in some foothill areas. With such rainfall amounts, there was significant snowfall totals in the local mountains with up to 28 inches of snow reported at the resort level. Additionally, the heavy rain did generate several flash flooding events including several mud and debris flows.

Severe Storm DR-1267 January 7 – 11, 2005 Flooding and debris flows Northridge
Earthquake
DR-1008 January 17 –
November 30, 1994
Power and communications disruptions, damage to structures

11.6.2 Hazard Risk Ranking
Table 11-12 presents a local ranking of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property, and the economy. Mitigation actions primarily target hazards with high and medium rankings.
852
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 11-12
Table 11-12.Hazard Risk Ranking
Rank Hazard Risk Ranking Score Risk Category
1 Landslide 33 High
2 Earthquake 32 Medium
3 Severe Storm 24 Medium
4 Severe Weather 24 Medium
5 Flooding 18 Medium
6 Wildfire 18 Medium
7 Dam Failure 12 Low
8 Sea Level Rise 12 Low
9 Tsunami 10 Low
10 Drought 9 Low

11.6.3 Jurisdiction-Specific Vulnerabilities
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. This section provides information on a few key vulnerabilities for this jurisdiction. Available jurisdiction-specific risk maps of the hazards are provided at the end of this annex.

Repetitive Loss Properties
Repetitive loss records are as follows:

Number of FEMA-identified Repetitive-Loss Properties: 4 Number of FEMA-identified Severe-Repetitive-Loss Properties: N/A Number of Repetitive-Loss or Severe-Repetitive-Loss Properties that have been mitigated: N/A Other Noted Vulnerabilities
The following jurisdiction-specific issues have been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources:

Unreinforced Masonry and Soft Story Structures—Ventura has several unreinforced masonry buildings and Soft Story buildings within the city limits. These buildings are subject to severe damage or structural collapse during a moderate to severe earthquake.

Street and Urban Flooding—There are numerous areas of the city that flood to varying degrees during periods of high rain. The effects of this flooding range from street closures to damage to property, vehicles and buildings.

Power Outages/Emergency Power—Local power outages including public safety power shutoffs (PSPS) have resulted from high winds and storm conditions as well as from the effects of wildland fire in the region. Many key city buildings including the Main City Hall and Council Chambers buildings have no back-up power or emergency generators.

Debris Flows—Following heavy rains and winter storms, substantial debris flows have occurred in the Santa Clara River, Ventura River, as well as other local streams and culverts. Debris flows following wildland fires are particularly bad and can require removal of material from streams, streets, culverts and beaches.
853

11. City of Ventura
11-13
Liquefaction Potential—Nearly the entire City of Ventura is in a “Liquefaction Zone”. The effects and damage caused by seismic activities can be amplified resulting in increased damage to buildings and infrastructure.

Homeless Population—A significant number of persons commonly defined as “Homeless” live in the Santa Clara River and other undeveloped areas. During wildland fires, storms, and flooding these individuals are at great risk.

Tsunami Awareness and Notification—Ventura has a large visitor and tourist population who may not be aware of the tsunami risk.

Mitigation actions addressing these issues were prioritized for consideration in the action plan in this annex.

11.7 STATUS OF PREVIOUS PLAN ACTIONS
Table 11-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared.

Table 11-13.Status of Previous Plan Actions
Removed;
Carried Over to Plan
Update
Action Item Completed
No Longer
Feasible
Check if
Yes
Action # in
Update
OA 4—Relocate or reinforce bike trails, parking lots and other beach access amenities away from the shoreline to restore the beach/shoreline in sea-level rise/coastal erosion areas.

VEN-1
Comment:The Surfers Point Managed Retreat Project Phase 1 has been completed. The Phase 2 design and permitting is nearly complete. The City is pursuing grants for construction. Seaside Wastewater Transfer Station relocation in exploratory phase.

OA 9—Identify potentially vulnerable public and private utility systems including electric, gas, oil, water, sewer and communication. Upgrade vulnerable systems to ensure the operation and timely restoration of essential systems to reasonable levels of service.

VEN-11
Comment:City of Ventura has multiple projects that meet criteria Southern California Edison has identified and is in the process of hardening their utility infrastructure. SoCalGas is also upgrading their facilities in the city.Water and Wastewater utilities are assessed through current Master Plan evaluations and projects developed for City CIP to address vulnerabilities.

OA 11—Develop and implement plans to increase the building owner’s general knowledge of and appreciation for the value of seismic upgrading of the building’s structural and nonstructural elements.

Comment: Due to staffing changes this action was not performed VEN-22
OA 19—Maintain vegetation management program that provides vegetation management services to elderly, disabled, or low-income property owners who lack the resources to remove flammable vegetation from around their homes.

VEN-17
Comment:Due to limited funding this initiative was not completed.

11.8 HAZARD MITIGATION ACTION PLAN
Table 11-14 lists the identified actions, which make up the hazard mitigation action plan for this jurisdiction. Table 11-15 identifies the priority for each action. Table 11-16 summarizes the mitigation actions by hazard of concern and mitigation type.
854
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 11-14
Table 11-14.Hazard Mitigation Action Plan Matrix
Benefits New or
Existing AssetsObjectives MetLead Agency
Support
Agency
Estimated
Cost Sources of Funding Timeline
ActionVEN-1—Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.

Hazards Mitigated:Landslide, Earthquake, Severe Storm, Severe Weather, Flooding, Wildfire, Dam Failure, Sea Level Rise, Tsunami New & Existing1,4,6,9,10,11,
16 Public Works High Grant Funding-FEMA HMA (BRIC,

FMA, HMGP)
Long Term
ActionVEN-2—Incorporate consideration of the FEMA 100-year tide and sea level rise, and climate change-driven extreme storms, into land use planning, shoreline development and dredging. This includes new policies by local jurisdictions, and County and City actions regarding their General Plans, visit Ventura tourist plan, Climate-related Plans, and the development applications.

Hazards Mitigated:Severe Storm, Flooding, Sea Level Rise New & Existing1, 2, 3, 4, 6, 10,
15, 17, 19
Community
Development
Public WorksMedium Staff Time, General FundsOngoing
ActionVEN-3—Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community, including Emergency Operations Plan, Community Climate Action plan, downtown specific plan, Citywide Evacuation Plan, General Plan, and ongoing plan maintenance
Hazards Mitigated:Landslide, Earthquake, Severe Storm, Severe Weather, Flooding, Wildfire, Dam Failure, Sea Level Rise, Tsunami, Drought
New & Existing1, 2, 10, 11, 12,
15, 16, 19
Community
Development
City Manager Low Staff Time, General FundsOngoing
ActionVEN-4—Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: Enforce the flood damage prevention ordinance, participate in floodplain identification and mapping updates, and provide public assistance/information on floodplain requirements and impacts.

Hazards Mitigated:Severe Storm, Severe Weather, Flooding, Dam Failure, Sea Level Rise, Tsunami New & Existing1, 2, 4, 6, 9, 10,
11, 13, 14, 15,
17, 18, 19
Public works Low Staff Time, General FundsOngoing
ActionVEN-5—Identify and pursue strategies to increase adaptive capacity to climate change including but not limited to the following:

Adopt a Climate Action Plan to reflect new State legislation, changing priorities, and environmental sustainability and greenhouse gas (GHG) reduction policies and goals.

Adopt modifications to existing plans and procedures to meet climate change issues and impacts.

Hazards Mitigated:Severe Storm, Severe Weather, Flooding, Wildfire, Sea Level Rise, Drought New & Existing1, 3, 4, 9, 10, 13,
14, 15, 16, 17, 19
Community
Development
(for the Climate
Action Plan)
Public Works
Ventura Water Medium Water and Sanitation Funds Short Term Action VEN-6—Advance long-term resilience to the population (including homeless individuals) to sea level rise and extreme storms for the communities and critical assets adjacent to San Buenaventura Beach, Santa Clara River, Ventura River, and nearby areas of the shoreline, as well as provide environmental, recreation, community/connectivity enhancements where possible.

Hazards Mitigated:Landslide, Severe Storm, Severe Weather, Flooding, Sea Level Rise, Tsunami Existing 1, 3, 4, 9, 10, 13,
14, 15, 16, 17, 19
City Manager
office
Medium General Funds, Grant Funding-FEMA

HMA (BRIC, FMA, HMGP)
Long Term
ActionVEN-7—City Energy, Power, and Communication Systems Reliability.Ensure adequate emergency power and fuel at critical City facilities, including communications equipment, for continuity of government and services. Reliability will include but is not limited to purchasing stationary generators for critical facilities.

Hazards Mitigated:Landslide, Earthquake, Severe Storm, Severe Weather, Flooding, Wildfire, Dam Failure, Tsunami New & Existing1, 2, 7, 10, 19City Manager Medium EMPG, DHS, Grant Funding-FEMA

HMA (BRIC, HMGP), CDBG
Mitigation, General Funds
Short Term
855

11. City of Ventura
11-15
Benefits New or
Existing AssetsObjectives MetLead Agency
Support
Agency
Estimated
Cost Sources of Funding Timeline
Action VEN-8—Identify appropriate facility/location for of the City’s Emergency Operations Center to ensure state of readiness and designate a back-up Emergency Operations Center and associated systems. This should include the rebuilding or replacement of the current facility to maintain the Emergency Operations Capacity.

Hazards Mitigated:Landslide, Earthquake, Severe Storm, Severe Weather, Flooding, Wildfire, Dam Failure, Tsunami New & Existing1, 8, 12, 17, 19City Manager N/A Low EMPG, DHS, BRIC, CDBG Mitigation, General Funds
Short Term
Action VEN-9—Consider participation in incentive-based programs such as Tree City, TsunamiReady,and StormReady.

Hazards Mitigated:Severe Storm, Severe Weather, Flooding, Wildfire, Tsunami New 1, 2, 19 City Manager N/A Low Staff Time, General FundsShort Term ActionVEN-10—Develop and implement a program to capture perishable data after significant events (e.g., high water marks, preliminary damage estimates, damage photos, snapshot in time status) to support future mitigation efforts including the implementation and maintenance of the hazard mitigation plan
Hazards Mitigated:Landslide, Earthquake, Severe Storm, Severe Weather, Flooding, Wildfire, Dam Failure, Tsunami New 1, 2, 4, 6, 8, 10,
11, 14, 15, 16,
17, 18, 19
City Manager NA Medium EM Budget, Staff Time Short Term Action VEN-11—Identifyandupgrade potentially vulnerable public and private utility systems, including electric, gas, oil, sewer, and communication, to ensure the operation and timely restoration of essential systems to reasonable levels of service. Including equipment, and critical facilities, (e.g. pump stations, generators, tide gates, stream gages, open channel, and culvert/pipeline infrastructure), to Improve community resilience and response to emergencies.

Hazards Mitigated:Landslide, Earthquake, Severe Storm, Severe Weather, Flooding, Wildfire, Dam Failure, Tsunami New & Existing 9,10,11,13 Public Works NA Medium Grant Funding-FEMA HMA (BRIC, HMGP), City Capital Project Funding
Long-term
Action VEN-12—Support green infrastructure projects that enhance resiliency to natural disasters and incorporate green design elements into hazard mitigation projects where feasible.

Hazards Mitigated:Severe Storm, Severe Weather, Flooding, Wildfire, Sea Level Rise, Drought New & Existing 1, 5, 13, 14, 15,
17 Public Works N/A Medium DHS, EMPG, General Funds, Clean California, Grant Funding-FEMA HMA
(BRIC, FMA, HMGP)
Short Term
Action VEN-13—CIPComplete construction and oversee ongoing operation, maintenance, and mitigation efforts for the Ventura Water Pure Program, which will result in the Identification of strategies to enhance potable reuse infrastructure planning/implementation.

Hazards Mitigated:Drought
New & Existing 1, 2, 3, 4, 9, 13,
15 Ventura Water Community
Development
Medium General Funds, Water Grants, Grant
Funding-FEMA HMA (BRIC, HMGP)
Long term
Action VEN-14—CIPComplete permitting and construction of theHall Canyon Channel,Drainage Basin Improvement Project, which will address storm-related flooding.

Hazards Mitigated:Severe Storm, Severe Weather, Flooding New & Existing 6, 9, 10, 11, 13,
14, 15
Public Works N/A Medium General Funds, Grant Funding-FEMA

HMA (BRIC, FMA, HMGP)
Long Term
Action VEN-15—CIP Emergency Egress. Main Street Bridge replacement project, Olivas Park drive extension and associated infrastructure. Existing bridge is not up to current seismic standards.

Hazards Mitigated:Earthquake
New & Existing6, 9, 10, 11, 13,
14, 15
Public Works N/A High General Funds, Staff Time, Grant
Funding-FEMA HMA (BRIC, HMGP)
Long Term
856
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 11-16
Benefits New or
Existing AssetsObjectives MetLead Agency
Support
Agency
Estimated
Cost Sources of Funding Timeline
Action VEN-16—CIP Continue to Identify and plan upgrades to existing and potential water wells and resources.

Hazards Mitigated:Landslide, Earthquake, Severe Storm, Severe Weather, Flooding, Wildfire, Dam Failure, Sea Level Rise, Tsunami, Drought
New & Existing 3, 9, 10, 13 Ventura Water N/A High Water Grants, State Grants, General Funds, Grant Funding-FEMA HMA
(BRIC, FMA, HMGP)
Long Term
Action VEN-17—Develop a targeted wildfire awareness public information program for property owners, including managing potential fuel sources on their privately owned property. (e.g. Developing a program that assists elderly, disabled, or low-income property owners who lack the resources to remove flammable vegetation from around their homes) Hazards Mitigated:Wildfire
New & Existing 2, 4, 5, 8, 10, 12 Fire Parks Medium General Funds, Clean CaliforniaGrantShort Term Action VEN-18—Impose mitigation measures on developers. Increase efforts to reduce landslides and erosion in existing and future development through continuing education of design professionals on mitigation strategies.

Educating design professionals and developers on mitigation strategies for existing development in identified hazard areas.

Adopting codes and standards to limit new development in areas identified as high-risk for landslides or erosion.

Hazards Mitigated:Landslide, Severe Storm, Flooding, Sea Level Rise, Tsunami New & Existing 16, 17, 19 Community
Development
Public Works Low Staff Time, General Funds, Grant
Funding-FEMA HMA (BRIC, FMA,
HMGP)
Short Term
Action VEN-19—Mutual Aid, Participate in general mutual-aid agreements with adjoining jurisdictions for cooperative response to fires, floods, earthquakes, and other disasters
Hazards Mitigated:Landslide, Earthquake, Severe Storm, Flooding, Wildfire, Dam Failure, Tsunami New & Existing1, 2, 3, 8, 12, 19 Fire N/A Low Staff Time Short Term Action VEN-20—Through the City’s Joint Powers Authority Fire/Rescue provider, the City of Ventura Fire Department, adopt the most current California codes and local regulations, conduct annual inspections of mandated occupies including multi-family dwellings (I.e. apartments, condos), hotels/motels, and schools to ensure compliance with fire/life safety and hazardous materials requirements, and including inspections of residential care facilities done as requested by of the Department of Social Services. Additionally, perform hazardous materials annual or three-year inspections of sites containing hazardous materials over specified thresholds as a Participating Agency in the California Unified Program Agency in compliance with applicable state laws.

Hazards Mitigated:Wildfire
New & Existing1, 2, 12, 16, 17,
19 Fire N/A High General Funds, Grant Funding-FEMA
HMA (BRIC, HMGP), DHS, Fire funds
Long Term
Action VEN-21—RetrofitFire Facilitiesin accordance with identified gaps found in theFire Department facilitiesStructural Analysis, which shows each City fire facility and its associated compliance-related deficits related to local regulations and industry standards.

Hazards Mitigated:Landslide, Earthquake, Severe Storm, Severe Weather, Flooding, Wildfire, Dam Failure, Sea Level Rise, Tsunami New & Existing 1, 2, 12, 16, 17,
19 Fire N/A High Fire Budget, General Fund, Grant
Funding-FEMA HMA (BRIC, HMGP),
DHS grants
Short Term
ActionVEN-22—Studythe City’s existing infrastructure, identify sources of potential funding to upgrade its older facilities, Unreinforced masonry , and soft story building, and install new infrastructure to the latest seismic standards under its Seismic Improvement Plan including but not limited to unreinforced masonry buildings.

Hazards Mitigated:Earthquake
New & Existing1, 4, 6, 9, 10, 11,
19 Community
Development
Public Works High General Funds, Grant Funding-FEMA
HMA (BRIC, HMGP), DHS, Fire funds
Short Term
857

11. City of Ventura
11-17
Benefits New or
Existing AssetsObjectives MetLead Agency
Support
Agency
Estimated
Cost Sources of Funding Timeline
Action VEN-23—Improve Tsunami Awareness and Notification capacity within population and visitors to the City of Ventura.

Hazards Mitigated:Earthquake, Tsunami
New & Existing1, 4, 6, 9, 10, 11,
19 City Manager High General Funds, Grant Funding-FEMA
HMA (BRIC, HMGP), DHS, Fire funds
Short Term
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date
Acronyms used here are defined at the beginning of this volume.

Table 11-15.Mitigation Action Priority
Action #
# of
Objectives
Met BenefitsCosts
Do Benefits
Equal or
Exceed Cost?
Is Project
Grant-
Eligible?
Can Project Be Funded
Under Existing
Programs/ Budgets?
Implementation
Prioritya
Grant
Pursuit
Prioritya
VEN-1 7 High High Yes Yes No Low Medium
VEN-2 9 MediumMedium Yes No No Medium Low
VEN-3 8 Medium Low Yes No Yes High Low
VEN-4 13 Medium Low Yes No Yes High Low
VEN-5 11 MediumMedium Yes No No Medium Low
VEN-6 11 MediumMedium Yes Yes No Low Medium
VEN-7 5 High Medium Yes Yes No Medium High
VEN-8 5 High Medium Yes Yes Yes Medium High
VEN-9 3 Medium Low Yes No Yes High Low
VEN-10 13 MediumMedium Yes No No Medium Low
VEN-11 4 High Medium Yes Yes No Low Medium
VEN-12 6 MediumMedium Yes Yes No Medium Medium
VEN-13 7 High Medium Yes Yes No Low Medium
VEN-14 7 High Medium Yes Yes No Low Medium
VEN-15 7 High High Yes Yes No Low Medium
VEN-16 4 High High Yes Yes No Low Medium
VEN-17 6 Low Medium No Yes No Low Medium
VEN-18 3 Medium Low Yes Yes Yes High Medium
VEN-19 6 Medium Low Yes No Yes High Low
VEN-20 6 Medium High No Yes No Low Medium
VEN-21 6 High High Yes Yes No Medium High
VEN-22 6 High High Yes Yes No Low High
VEN-23 3 High High Yes Yes No Low High
a. See the introduction to this volume for explanation of priorities. 858
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 11-18
Table 11-16.Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard TypePrevention
Property
Protection
Public
Education &
Awareness
Natural
Resource
Protection
Emergency
Services
Structural
Projects
Climate
Resilience
Community
Capacity
Buildingb
High-Risk Hazards
Landslide VEN-18 VEN-1, 6, 11, 21VEN-6, 18 VEN-7, 8, 19 VEN-16 VEN-3, 10 Medium-Risk Hazards
Earthquake VEN-1, 11, 15,
21, 22
VEN-23 VEN-7, 8, 19 VEN-16 VEN-3, 10, 22,
23 Severe StormsVEN-4, 18 VEN-1, 6, 11, 21 VEN-6, 18 VEN-12 VEN-7, 8, 19 VEN-14 VEN-12, 16 VEN-2, 3, 5, 9, 10 Severe
Weather
VEN-4, 18 VEN-1, 6, 11, 21 VEN-6, 18 VEN-12 VEN-7, 8, 19 VEN-14 VEN-12, 16VEN-3, 5, 9, 10 Flooding VEN-4 VEN-1, 6, 11, 21 VEN-6, 18 VEN-12 VEN-7, 8, 19 VEN-14 VEN-12, 16 VEN-2, 3, 5, 9, 10 Wildfire VEN-20 VEN-1, 11, 21 VEN-17 VEN-12 VEN-7, 8, 19 VEN-12, 16 VEN-3, 5, 9, 10 Low-Risk Hazards
Dam Failure VEN-4 VEN-1, 11, 21 VEN-7, 8, 19 VEN-16 VEN-3, 10 Sea Level RiseVEN-4, 18 VEN-1, 6, 21 VEN-6, 18 VEN-12 VEN-12, 16 VEN-2, 3, 5 Tsunami VEN-4, 18 VEN-1, 6, 11, 21 VEN-6, 18, 23 VEN-7, 8, 19 VEN-13 VEN-3, 9, 10, 23 Drought VEN-12 VEN-12, 16 VEN-3, 5
a. See the introduction to this volume for explanation of mitigation types. b. Note that the jurisdiction did not identify a need for expansion of financial capabilities, based on existing capabilities. The intent of this hazard mitigation plan is to expand the financial capability of the jurisdiction.

11.9 PUBLIC OUTREACH
Table 11-17 lists public outreach activities in connection with this hazard mitigation plan update for this jurisdiction.

Table 11-17.Local Public Outreach
Local Outreach Activity Date
Number of People
Involved
Social media link and website outreach for the public survey 9-28 118

11.10 INFORMATION SOURCES USED FOR THIS ANNEX
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex.

City of San Buenaventura General Plan—The General plan is under revision and has been aligned to be compliant with AB2140.

City of San Buenaventura Municipal Code—The municipal code was reviewed for the full capability assessment and for identifying opportunities for action plan integration.

Flood Damage Prevention Ordinance—The flood damage prevention ordinance was reviewed for compliance with the National Flood Insurance Program. 859

11. City of Ventura
11-19
Health and Safety Code Section 13146—Specifies the inspections the Fire Department is mandated by state law to perform annually.

California Code of Regulations Title 27—Specifies hazardous materials regulations enforced by the Ventura Fire Department as a Participating Agency in the statewide Certified Unified Program.

California Government Code 51179-82—Specifies fire defensible requirements around structures.

California, Amending Division 12, Part 4, of the San Buenaventura Municipal Code, entitled “Floodplain Regulations” to comply with FEMA revisions to those regulations to meet the FEMA Model Ordinance in conjunction with the new California Coastal Analysis and Mapping Project that provides new maps for the coastal communities in Southern California that will be adopted by FEMA on January 29, 2021
Hazard Mitigation Plan Annex Development Toolkit—The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan.

11.11 FUTURE NEEDS TO BETTER UNDERSTAND RISK/VULNERABILITY The City of Ventura will perform a Threat and Hazard Identification and Risk Assessment (THIRA) process to help the community understand the normal set of risks it faces. By identifying and prioritizing those threats, a community can then prioritize revisions and realignment of actions in this plan over time.

11.12 ADDITIONAL COMMENTS
The City of Ventura intends to continuously review and adjust this document annually. 860
Oxnard
San
Buenaventura
33 126
1 118
33 33
232
33 126101
101
Food, Water, Shelter
Health and Medical
Safety and Security
Major Roads
Selected City
Incorporated Cities
County Boundary
Data Sources: Ventura Co., VCFD,
Casitas MWD, Calleguas MWD,
City of Camarillo, CA Energy
Commission, Cal Trans, EPA,
HIFLD, Esri
San Buenaventura
Critical Facilities (1 of 2)
0 1 20.5 Miles
861
Oxnard
San
Buenaventura
33 126
1 118
33 33
232
33 126101
101
Communications
Energy
Hazardous Material
Transportation
Major Roads
Selected City
Incorporated Cities
County Boundary
Data Sources: Ventura Co., VCFD,
Casitas MWD, Calleguas MWD,
City of Camarillo, CA Energy
Commission, Cal Trans, EPA,
HIFLD, Esri
San Buenaventura
Critical Facilities (1 of 2)
0 1 20.5 Miles
862
Oxnard
San
Buenaventura
33 126
1 118
33 33
232
33 126101
101
Data Sources: Ventura Co.,
CA DWR, Esri
San Buenaventura
Dam Failure
Inundation Areas
0 1 20.5 Miles
Combined Inundation
Areas
Major Roads
Selected City
Incorporated Cities
County Boundary
863
Oxnard
San
Buenaventura
33 126
1 118
33 33
232
33 126101
101
Data Sources: Ventura Co.,
CGS, Esri
San Buenaventura
NEHRP Soil Class
0 1 20.5 Miles
C (Dense soil/soft rock)
D (Stiff soil)
E (Soft clay)
Major Roads
Selected City
Incorporated Cities
County Boundary
864
Oxnard
San
Buenaventura
33 126
1 118
33 33
232
33 126101
101
Data Sources: Ventura Co.,
Esri
San Buenaventura
Liquefaction Susceptibility
0 1 20.5 Miles
Liquefaction zone
Major Roads
Selected City
Incorporated Cities
County Boundary
865
Oxnard
San
Buenaventura
33 126
1 118
33 33
232
33 126101
101
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
San Buenaventura
100-Year Probabilistic
Earthquake Scenario
0 1 20.5 Miles
Mercalli Intensity Scale
VII (Very Strong/Moderate)
Major Roads
Selected City
Incorporated Cities
County Boundary
866
Oxnard
San
Buenaventura
33 126
1 118
33 33
232
33 126101
101
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
San Buenaventura
Oak Ridge M7.16
Earthquake Scenario
0 1 20.5 Miles
Mercalli Intensity Scale
VII (Very Strong/Moderate)
VIII (Severe/Moderate-Heavy)
Major Roads
Selected City
Incorporated Cities
County Boundary
867
Oxnard
San
Buenaventura
33 126
1 118
33 33
232
33 126101
101
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
San Buenaventura
Pitas Point M7.12
Earthquake Scenario
0 1 20.5 Miles
Mercalli Intensity Scale
VII (Very Strong/Moderate)
VIII (Severe/Moderate-Heavy)
Major Roads
Selected City
Incorporated Cities
County Boundary
868
Oxnard
San
Buenaventura
33 126
1 118
33 33
232
33 126101
101
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
San Buenaventura
San Cayetano M7.16
Earthquake Scenario
0 1 20.5 Miles
Mercalli Intensity Scale
VI (Strong/Light)
VII (Very Strong/Moderate)
VIII (Severe/Moderate-Heavy)
Major Roads
Selected City
Incorporated Cities
County Boundary
869
Oxnard
San
Buenaventura
33 126
1 118
33 33
232
33 126101
101
Data Sources: Ventura Co.,
USGS, Esri
Intensity scale described as:
(perceived shaking / potential damage)
San Buenaventura
S. San Andreas M8.03
Earthquake Scenario
0 1 20.5 Miles
Mercalli Intensity Scale
V (Moderate/Very Light)
VI (Strong/Light)
Major Roads
Selected City
Incorporated Cities
County Boundary
870
Oxnard
San
Buenaventura
33 126
1 118
33 33
232
33 126101
101
Data Sources: Ventura Co.,
FEMA, Esri
San Buenaventura
FEMA Flood Hazard Areas
0 1 20.5 Miles
1% Annual Chance
Flood (100-Year)

0.2% Annual Chance
Flood (500-Year)
Major Roads
Selected City
Incorporated Cities
County Boundary
871
Oxnard
San
Buenaventura
33 126
1 118
33 33
232
33 126101
101
Data Sources: Ventura Co.,
CGS, Esri
San Buenaventura
Susceptibility to
Deep-Seated Landslides
0 1 20.5 Miles
Low
Moderate
High
Very High
Major Roads
Selected City
Incorporated Cities
County Boundary
872
Oxnard
San
Buenaventura
33 126
1 118
33 33
232
33 126101
101
Data Sources: Ventura Co.,
OCOF, Esri
San Buenaventura
Sea Level Rise
of 25 cm (9.8 in.)
0 1 20.5 Miles
Sea Level Rise
Inundation Area
Major Roads
Selected City
Incorporated Cities
County Boundary
873
Oxnard
San
Buenaventura
33 126
1 118
33 33
232
33 126101
101
Data Sources: Ventura Co.,
OCOF, Esri
San Buenaventura
Sea Level Rise
of 100 cm (39.4 in.)
0 1 20.5 Miles
Sea Level Rise
Inundation Area
Major Roads
Selected City
Incorporated Cities
County Boundary
874
Oxnard
San
Buenaventura
33 126
1 118
33 33
232
33 126101
101
Data Sources: Ventura Co.,
CGS, Esri
San Buenaventura
Tsunami Inudation Zones
0 1 20.5 Miles
Inundation Zones
Major Roads
Selected City
Incorporated Cities
County Boundary
875
Oxnard
San
Buenaventura
33 126
1 118
33 33
232
33 126101
101
Data Sources: Ventura Co.,
CAL FIRE, Esri
San Buenaventura
Wildfire Hazard
Severity Zones
0 1 20.5 Miles
Moderate
High
Very High
Major Roads
Selected City
Incorporated Cities
County Boundary
876
877
12-1

12. CALIFORNIA STATE UNIVERSITY, CHANNEL ISLANDS

12.1 LOCAL HAZARD MITIGATION PLANNING TEAM
Primary Point of Contact Alternate Point of Contact
Maggie Tougas, CSUCI Emergency Manager
One University Drive
Camarillo, CA 93012
Telephone: 805-415-0020
e-mail Address: [email protected]
David Carlson
One University Drive
Camarillo, CA 93012
Telephone: 805-437-8472
e-mail Address: [email protected]
This annex was developed by the local hazard mitigation planning team, whose members are listed in Table 12-1.

Table 12-1.Local Hazard Mitigation Planning Team Members Name Title
Maggie Tougas Emergency Manager
Tom Hunt Assistant Vice PresidentFacilities Services
Joyce Spencer Director, Environmental Health and Safety Wesley Cooper Senior Director, Facilities Services
Roxanne Coryell-Biegel Sustainability and Energy Manager Terry Tarr Assoc.Architect
Carlos Miranda Assoc. Director Information Security
Dave Carlson Planning Design & Construction

12.2 JURISDICTION PROFILE

12.2.1 Overview
The California State University Channel Islands (CSUCI) is a public university in Ventura County, California. CSUCI opened in 2002 as the 23rd campus in the California State University system. CSUCI is located midway between Santa Barbara and Los Angeles near Camarillo, at the intersection of the Oxnard Plain and northernmost edge of the Santa Monica Mountains range. The Channel Islands are nearby where the university operates a scientific research station on Santa Rosa Island.

The campus is located about two miles south of the city of Camarillo, at the base of Long Grade Canyon. The school is set on rich agricultural land at the edge of the Oxnard Plain bordered by farms and nestled into the base of the Santa Monica Mountains. The flat site is marked by a lone peak called 878
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 12-2
Round Mountain (the Chumash name is Sathwiwa). The campus is situated on land historically inhabited by the Chumash.

The site was originally a state hospital and operated from 1936 to 1997. The state hospital was built in a remote area so roads were improved to provide for the campus traffic. The university developed a bus transit network to serve the campus with VISTA buses providing access to Gold Coast Transit in Oxnard and the Camarillo train station. After gaining official possession of the land in 1998, improvements began in 1999 on the 634-acre existing campus-style facility, primarily one to two-story buildings organized around three primary quads. In 2007, the campus acquired an additional 153 acres.

Many of the buildings are in the Mission Revival and Spanish Colonial Revival architectural styles, although there are a few “modern” buildings. The campus is split into two primary sections: North Quad and South Quad. In 2012, Del Norte and Madera halls were opened in the North Quad; some of the buildings in the North Quad are still uninhabited and unsafe due to age, which became CSU Channel Islands University Park located adjacent to the campus. The university is a Hispanic-serving institution.

Channel Islands offers 54 types of Bachelor’s degrees, 6 different graduate (Master’s) degrees, 19 teaching credentials, and an Ed.D degree. In the fall of 2018, the university enrolled the largest number of students in its history with 7,095 undergraduate and postgraduate students. Since its establishment, the university has awarded over 11,000 students with degrees.

CSUCI is the only four-year public university in Ventura County and in 2010 it received Hispanic Serving Institution status (HSI). The university achieved this status by moving past the threshold of having at least a 25 percent Hispanic student population. The Hispanic/Latino student population was 50% as of the fall of 2017.

Planning for the University began in 1965, when State Senator Robert J. Lagomarsino co-authored Senate Bill 288 calling for establishment of a four-year public college in Ventura County, and Governor Pat Brown signed a bill authorizing a study for a state college for the county. In 1974, Dr.

Joyce Kennedy established the UC/CSU Ventura Learning Center in Ventura as a partnership between UC Santa Barbara and California State University, Northridge. The Ventura Learning Center became the CSU Northridge Ventura Campus in 1988.

In 1996, J Handel began as the campus planning president to begin development of a public four-year university for the region. In 1997 the CSU Board of Trustees voted to accept the former Camarillo State hospital site for the purpose of transforming it into the CSU’s 23rdcampus. At this time the hospital closed. In August 1999, the Ventura Learning Center moved to the Camarillo site as a CSU Northridge satellite facility.

In 2001, the CSU Board of Trustees appointed Richard R. Rush, Ph.D., as Founding President of California State University Channel Islands. While establishing the University structures, Dr. Rush has overseen and participated in the hiring of faculty and the university’s senior staff. On August 16, 2002, CSUCI opened to upper division transfer students and in the fall of 2003, accepted its first freshman class.

The CSUCI Campus President assumes responsibility for the adoption of this plan; Public Safety Staff will oversee its implementation.
879

12. California State University, Channel Islands
12-3

12.2.2 Service Area
The District service area covers 1.85 square miles serving a population of approximately 7,000 combined students, faculty, and staff.

12.2.3 Assets
Table 12-2 summarizes the assets of the District and their value.

Table 12-2.Special-Purpose District Assets
Asset Value
Property
1,187acres of land Unknown
Equipment
2014 ChevroletImpala,1417560 $40,150
2012 Ford Crown Victoria, 139072 $6,000
2014 Chevrolet Tahoe, 1322719 $14,250
2015 ChevroletTahoe,1463257 $65,000
2017 Chevrolet Tahoe, 1506693 $65,000
2017 ChevroletTahoe,1526913 $65,000
2018 ChevroletTahoe,1561135 $65,000
2011 Ford CrownVictoria,1362925 $6,000
2018 ChevroletImpala,1551846 $48,550
2005 4 Seat GEMCart1172160 $4,000
2014 Chevrolet 2500, 1417575AdminEOCParking $62,000
2016 Chevrolet Colorado,14698PSO $37,050
Critical Facilities(all default to 1 University Drive, Camarillo) Aliso Hall (Science/Lab), West of Central Mall $8,636,406 Anacapa Village (Student HousingA, B, C, Pool House), East of Petrero Road $28,350,319 Arroyo Hall (Gym) $6,121,457
Bell Tower Central (Education), West of South Quad $27,368,019 Bell Tower East (Office of Dean Pena), East of South Quad $7,276,728 Bell Tower West (Office of the Provost), West of South Quad $6,531,890 Broome Library (Library/Classrooms), East of Central Mall $60,337,738 Carden School, Camarillo Street Unknown
Central Plant (HVAC/Facilities), Rear of Ironwood Hall $2,778,517 Chaparral Hall (General) $813,354
CI Power (Cogen), South of Central Plant $15,905,657
Del Norte Hall (Fiscal Resources), South End of North Quad $27,651,627 El Dorado Hall (Recreation Center) $1,818,956
Ironwood Hall (Facilities Services), East of Central Plant $6,300,580 Islands Cafe (Food Service), North of Topanga Hall $3,172,669 Lindero Hall (Administration) $2,490,846
Malibu Hall (General) $4,769,335
Manzanita Hall (General) $1,636,032
Martin V. Smith Decision Center (Lecture Hall, Conference Rooms) $1,596,020 Modoc Hall (Science Labs, Classrooms) $880,258
880
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 12-4
Asset Value
Napa Hall (Administrative Office) $5,055,083
Ojai Hall (Data/Tech/EOC), North of Bell Tower Unknown
OPC Shops (Corp Yard) $2,084,347
Placer Hall (General) $3,421,414
PD and Dispatch, Placer Hall Unknown
Sage Hall (General) $8,014,973
Santa Cruz Village (Student HousingD, E, F) West of South Quad $32,250,010 Santa Rosa Village (Student Housing), East of South Quad $60,122,800 Sierra Hall (Science/Lab), East of Central Mall $33,254,128 Solano Hall (HR/Employment), West of North Quad $5,427,456 Student Union (Food/Recreation), North of Bell Tower West $11,312,460 Topanga Hall (Art Studio) $2,548,247
Town Center (Housing/Food Service), East of Broome Library Unknown University Hall (Office of the President), North of Central Mall $6,027,735 Water Storage Tank, Channel Islands Drive/Camarillo Street Unknown Yuba Hall (Student Health Services), South of Rincon Drive Unknown Total: $383,955,061

12.3 CURRENT TRENDS
The campus is under continuing construction to accommodate the projected growth of the university.

While there are about 7,000 registered students, projected enrollment for the year 2025 is 15,000 full- time students.

12.4 CAPABILITY ASSESSMENT
This section describes an assessment of existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning.

Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table in this annex identifies these as community capacity building mitigation actions. The findings of the assessment are presented as follows:

An assessment of planning and regulatory capabilities is presented in Table 12-3.

An assessment of fiscal capabilities is presented in Table 12-4.

An assessment of administrative and technical capabilities is presented in Table 12-5.

An assessment of education and outreach capabilities is presented in Table 12-6.

Classifications under various community mitigation programs are presented in Table 12-7.

The community’s adaptive capacity for the impacts of climate change is presented in Table 12-8. 881

12. California State University, Channel Islands
12-5
Table 12-3.Planning and Regulatory Capability
Plan, Study or Program
Most Recent
Update Comment
Executive Order 987 2019 Building Operations and Maintenance California Building Code 2019 Building design standards Policy Number: FA.32.003 Strategic Risk Management2019 Identifies and Assesses risks to the campus Communicable Disease Response Plan 2020 Addresses communicable disease management.

CSU Channel Islands Exterior Building Management Plan 2014 Exterior buildings management; stormwater management.

Executive Order 1039 2017 Policy on Occupational Safety Emergency Operations Plan 2018 Preparation, Response and Recovery.

Executive Order 1014 2017 Business Continuity Plan
Table 12-4.Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants No
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes No
User Fees for Water, Sewer, Gas or Electric Service No
Incur Debt through General Obligation Bonds No
Incur Debt through Special Tax Bonds No
Incur Debt through Private Activity Bonds No
Withhold Public Expenditures in Hazard-Prone Areas No
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers Yes Table 12-5.Administrative and Technical Capability
Staff/Personnel Resource Available?
Planners or engineers with knowledge of land development and land management practicesYes If Yes, Department /Position:Facilities services, use consultants from Chancellor’s Office Engineers or professionals trained in building or infrastructure construction practices Yes If Yes, Department /Position:Engineering consultants, Facilities Services Director. Enter Response Planners or engineers with an understanding of natural hazards Yes If Yes, Department /Position:Facilities Services, consultants.

Staff with training in benefit-cost analysis Yes
If Yes, Department /Position:Dept.of Business and Finance, Assistant Vice PresidentBudget and Planning Surveyors No
Personnel skilled or trained in GIS applications Yes
If Yes, Department /Position:Facilities Services, Environmental Health and Safety Scientist familiar with natural hazards in local area Yes If Yes, Department /Position:Facilities Services, Environmental Health and Safety, CSUCI Faculty ESRM Emergency Manager Yes
If Yes, Department /Position:Public Safety
Grant writers Yes
If Yes, Department /Position:Academic Affairs
Other Yes
If Yes, Department /Position:Facilities Services Environmental Impacts 2004 882
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 12-6
Table 12-6.Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? Yes If yes, briefly describe:COVID prevention and mitigation, Evacuation Plan Do you use social media for hazard mitigation education and outreach? Yes If yes, briefly describe:Facebook, Twitter, and Instagram for emergency preparedness activities Do you have any citizen boards or commissions that address issues related to hazard mitigation?No Do you have any other programs in place that could be used to communicate hazard-related information? Yes If yes, briefly describe:Public Safety Fair, Flood and Fire Prevention Do you have any established warning systems for hazard events? No If yes, briefly describe:Informacast, CI Alert Notification Systems Table 12-7.Community Classifications
Participating? Classification Date Classified
FIPS Code No N/A N/A
DUNS# Yes 796879943 N/A
Community Rating System No N/A N/A
Building Code Effectiveness Grading Schedule No N/A N/A Public Protection No N/A N/A
Storm Ready Yes N/A September 19, 2019
Firewise No N/A N/A
Tsunami Ready No N/A N/A
Table 12-8.Adaptive Capacity for Climate Change
Criterion
Jurisdiction
Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Medium Comment:Climate change is taught in ESRM and biology classes, faculty have been doing research in climate change for a number of years, utilization of solar lighting, electric carts and buses, a climate change action plan is in process.

Jurisdiction-level monitoring of climate change impacts Medium Comment:Faculty and staff are conducting research and continue to monitor and address impacts Technical resources to assess proposed strategies for feasibility and externalities Low Comment:

Jurisdiction-level capacity for development of greenhouse gas emissions inventory High Comment:CI consistently conduits inventory for GH emissions . The CSU requires the campus to exceed California Green Building Code standards.

Capital planning and land use decisions informed by potential climate impacts Medium Comment:Continued implementation of solar lighting, generators and batteries Participation in regional groups addressing climate risks Medium Comment:CI holdsmeetingsdiscussing climate issues once a month, conducts research with the National Park ‘Service and State parks, Dept. of Fish and Game
883

12. California State University, Channel Islands
12-7
Criterion
Jurisdiction
Ratinga
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processesMedium Comment:There is a system-wide goal to reduce greenhouse gas emissions. Currently working on a plan.

More classes will be offered on this subject in ESRM and biology.

Identified strategies for greenhouse gas mitigation efforts Medium Comment:There is a system-wide goal to reduce greenhouse gas emissions.Currently working on a plan.

More classes will be offered on this subject in ESRM and biology.

Identified strategies for adaptation to impacts Low
Comment:

Champions for climate action in local government departments Low Comment:

Political support for implementing climate change adaptation strategies Low Comment:

Financial resources devoted to climate change adaptation Low Comment:We have no budget for this at CI.

Local authority over sectors likely to be negative impacted Low Comment:

Public Capacity
Local residents’ knowledge of and understanding of climate risk Medium Comment:Conducted presentations on climate impact to faculty, staff and students Local residents’ supportof adaptation efforts Low
Comment:N/A
Local residents’ capacity to adapt to climate impacts Low Comment:Unknown
Local economy current capacity to adapt to climate impacts Low Comment:Unknown
Local ecosystems capacity to adapt to climate impacts Low Comment:Unknown
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.

12.5 INTEGRATION REVIEW
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed at the end of this annex were used to provide information on integration. The progress reporting process described in Volume 1 of the hazard mitigation plan will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration. 884
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 12-8

12.5.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs:

CSU Channel Islands Capital Improvement Plan, Facilities Plan—Incorporate new and updated hazards information relevant to the CSUCI Campus sand University Glen Neighborhood. The hazard mitigation plan may identify new possible funding sources for capital improvement projects and may result in modifications to proposed projects based on results of the risk assessment.

CSUCI Emergency Operations Plan (EOP), 2018 (pending approval)—Hazard Summary for the campus needs updating. Hazards referenced in the Ventura County Multi-Hazard Mitigation Plan for more specific information.

Wildfire Reduction and Preparedness Plan—Year round recommendations for defensible space remediation and smoke intrusion into campus buildings.

Capital Improvement Plan—The capital improvement plan includes projects that can help mitigate potential hazards.

Exterior Building Management Plan—CSU Channel Islands property maintains a comprehensive exterior and hardscape management plan, using as a guideline, the standards developed by the US Green Building’s Council’s LEED program. The plan incorporates best management practices which significantly reduce the use of harmful chemicals, energy waste, water waste, air pollution, solid waste and/or chemical runoff as compared to traditional practices

12.5.2 Opportunities for Future Integration
The capability assessment in this annex indicates opportunities to integrate this mitigation plan with other jurisdictional planning/regulatory capabilities. Capabilities were identified as integration opportunities if they can support or enhance the actions identified in this plan or be supported or enhanced by components of this plan. The capability assessment identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future:

Climate Action Plan—Adopting a formal plan indicates the institution’s commitment to reducing its global warming impact. Since multiple facets of an institution’s operations can help reduce emissions, developing a climate action strategy can help an institution realize its sustainability goals as well as climate targets.Currently, the Campus is in the process of writing a Climate Action Plan.

Capital Improvement Projects—Capital improvement project proposals may take into consideration hazard risks and provide mitigation recommendations as a means of evaluating project prioritization.

Post-Disaster Recovery Plan—The campus addresses recovery and is part of the Ventura County Long Term Recovery Group and Ventura County VOAD (Voluntary Organizations Active in Disaster). The campus utilizes the specific goals, objectives and processes from the Long- Term Recovery Group and VC VOAD. The campus will also utilize particular aspects that are included in the Ventura County EOP.
885

12. California State University, Channel Islands
12-9
Taking action to integrate each of these programs with the hazard mitigation plan was considered as a mitigation action to include in the action plan in this annex.

12.6 RISK ASSESSMENT

12.6.1 Jurisdiction-Specific Natural Hazard Event History Table 12-9 lists past occurrences of natural hazards for which specific damage was recorded in this jurisdiction Other hazard events that broadly affected the entire planning area, including this jurisdiction, are listed in the risk assessments in Volume 1 of this hazard mitigation plan.

Table 12-9.Past Natural Hazard Events
Type of Event
FEMA
Disaster # Date Damage Assessment
COVID-19 PandemicDR-4482 January 20, 2020 and
continuing
The campus did not experience any property damages from COVID19 just emergency protective measures response related costs, telecommuting costs, testing, workplace safety inserts (plexiglass, HVAC upgrades) total approximately $5,000,000.00 Maria Fire FM-5302 November 1, 2019Campus was not directly impacted by this fire, however, The Arc of Ventura County opened a community shelter at the Camarillo Community Center.

Hill/Woolsey Fire November 2018 Campus directly affected, Fire approached campus, campus impacted by smoke. Campus was closed for numerous days.

Wildfires, Flooding,
Mudflows, and Debris
Flows
(Thomas Fire)
DR-4353 December 4, 2017-
January 31, 2018
Although this fire burned 281,893 acres in both Ventura County and Santa Barbara County, the campus was only indirectly impacted by smoke, however, faculty, staff and students were unable to go to work or class due to the compromised 101 corridor in Montecito.

Flooding February 18, 2017 Localized flooding of the campus due to a severe storm closed the campus for several days.

Springs Fire FM-5024 May 2 –11, 2013 24,251 acres burned; The campus was surrounded by fire, lots of smoke damage, melted cell towers and irrigation lines, one outbuilding destroyed and several buildings damaged.Campus was closed for numerous days.

Wildfires, Flooding,
Mudflows, and Debris
Flows; Springs Fire
December 14, 2014 Camarillo Springs near campus had a significant mudslide.Campus had moderate flooding on the roads in and out of campus.

Wildfires, Flooding,
Mudflows, and Debris
Flows
DR-1731 October 21 –March 31,
2008
Although Ventura County was impacted by the Ranch Fire, the campus was not directly impacted except for heavy smoke.

Shekell Fire FM-2681 December 3 –6, 2006 This fire burned in Fillmore and Moorpark. The campus had no direct impacts from the fire only indirectly from smoke.

Day Fire FM-2677 September 25 – 30, 2006The campus was not directly impacted except for heavy smoke.

Topanga Fire FM-2583 September 28 –October
10, 2005
The campus was not directly impacted except for smoke.

Severe Storms,
Flooding, Landslides,
and Mud and Debris
Flows
DR-1585 February 16 –23, 2005 City experienced localized flooding. No significant losses were documented. The campus was affected due to road closures. 886
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 12-10
Type of Event
FEMA
Disaster # Date Damage Assessment
Severe Storms,
Flooding, Debris
Flows, and Mudslides
DR-1577 December 27, 2004 –
January 11, 2005
Water and mudslides damaged structures in the city.

Wildfires, Flooding,
Mudflow and Debris
Flow
DR-1498 October 21, 2003 –
March 31, 2004
The campus was not directly impacted from the fires in Piru and Fillmore except for heavy smoke
CSUCI opened in 2002. Therefore, damage prior to 2002 affected the areanow known as CSUCI.

Severe Winter Storms
and Flooding
DR-1203 February 2 –April 30, 1998 Backed up storm drains caused flooding.

Severe Winter Storms,
Flooding, Landslides,
Mud Flows
DR-1046 February 13 – April 19,
1995
Localized flooding and clogged storm drains.

Severe Winter Storms,
Flooding, Landslides,
Mud Flows
DR-1044 January 3 –February,
1995
Localized flooding and clogged storm drains.

Northridge EarthquakeDR-1008 January 17 – November
30,1994
Structure and infrastructure damages.

Fires, Mud &
Landslides, Soil
Erosion, Flooding
DR-1005 October 26 –April 22, 1994 Multiple fires around Ventura County and subsequent flooding.

Smoke and flooding impacts
Severe Storm, Winter
Storm, Mud &
Landslides, Flooding
DR-979 January 5 –March 20,
1993
Localized street flooding.

Snow Storm, Heavy
Rain, High Winds,
Flooding, Mudslide
DR-935 February 10 –19, 1992 City experienced localized street flooding.

Severe Freeze DR-894 December 19, 1990 –
January 3, 1991
Countywide damages.

Grass, Wildlands,
Forest Fires
DR-739 June 26 –July 19, 1985 Area was not directly impacted except for heavy smoke.

Coastal Storms,
Floods, Slides,
Tornadoes
DR-677 January 21 –March 30,
1983
Flooding
Severe Storms,
Mudslides, Flooding
DR-615 January 8, 1980 Flooding countywide.

12.6.2 Hazard Risk Ranking
Table 12-10 presents a local ranking of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property, and district operations. Mitigation actions primarily target hazards with high and medium rankings.
887

12. California State University, Channel Islands
12-11
Table 12-10.Hazard Risk Ranking
Rank Hazard Risk Ranking Score Risk Category
1 Earthquake 32 Medium
2 Severe Storms 24 Medium
2 Severe Weather 24 Medium
4 Dam Failure 22 Medium
5 Flooding 18 Medium
5 Landslide 18 Medium
7 Wildfire 12 Medium
8 Drought 9 Low

12.6.3 Other Noted Vulnerabilities
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. The following jurisdiction-specific issues have been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources:

Wildfire frequently affects the campus. Campus structures and communication towers have been burned or been damaged. Smoke damage is the most frequent event.

Flooding regularly occurs during periods of heavy rainfall. One campus dormitory regularly floods.

Climate Change amplified in the future.

Mitigation actions addressing these issues were prioritized for consideration in the action plan in this annex.

12.7 HAZARD MITIGATION ACTION PLAN
Table 12-11 lists the actions that make up the hazard mitigation action plan for this jurisdiction.

Table 12-12 identifies the priority for each action. Table 12-13 summarizes the mitigation actions by hazard of concern and mitigation type.

Table 12-11.Hazard Mitigation Action Plan Matrix
BenefitsNew or
Existing Assets
Objectives
Met
Lead
Agency
Support
Agency
Estimated
Cost Sources of Funding Timelinea
Action CSU-1—Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.

Hazards Mitigated:Earthquake,Flooding, Severe Storms, Landslide Existing 9, 10, 11 Facilities
Services
High Staff Time, General Funds,
Grant Funding- FEMA HMA (BRIC, FMA, HMGP)
Short-term
Action CSU-2—Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.

Hazards Mitigated:All hazards
New & Existing 8, 19 Public
Safety
Low Staff Time, General Funds Short-term
Action CSU-3—Purchase solar back up batteries and solar panels to sustain adequate powerin campus buildings.

Hazards Mitigated:All hazards
New & Existing 2, 6 Facilities
Services
Chancellor’s
Office
Medium Staff Time, General Funds,
Grant Funding- FEMA HMA (BRIC, FMA, HMGP)
Short-term
888
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 12-12
BenefitsNew or
Existing Assets
Objectives
Met
Lead
Agency
Support
Agency
Estimated
Cost Sources of Funding Timelinea
Action CSU-4—Harden earthen dam by way of debris basin infrastructure and spillway located above University Glen community and student housing in Town Center.

Hazards Mitigated:Flooding, Severe Storms
Existing 2,9,10, 11,
14, 15
Facilities
Services
High Staff Time, General Funds,
Grant Funding- FEMA HMA (BRIC, FMA, HMGP)
Short-term
Action CSU-5—Replace undersized reclaimed water lines to increase capacity, create sustainability and mitigate flooding.

Hazards Mitigated:Flooding, Severe Weather, Drought
Existing 6, 9, 10, 11, 14Facilities
Services
High Staff Time, General Funds,
Grant Funding- FEMA HMA (BRIC, FMA, HMGP)
Short Term
Action CSU-6—Harden infrastructure of two bridges on campus. Bridges are compromised during storm events and rip rap is eroding at the base of the bridges.

Hazards Mitigated:Flooding, Severe Weather
Existing 6, 9, 10, 11, 15 Facilities
Services
Medium Staff Time, General Funds,
Grant Funding- FEMA HMA (BRIC, FMA, HMGP)
Short Term
Action CSU-7—Create and maintain defensible space around structuresand other infrastructure to coordinate with existing Emergency Operations Plan actions.

Hazards Mitigated:Wildfire
New & Existing 5, 6, 9 Facilities
Services
Cal Fire,
Chancellor’s
Office
Low Staff Time, General Funds,
Grant Funding- FEMA HMA (BRIC, FMAP and
HMGP)
Short Term
Action CSU-8—Retrofit Modoc Hall by replacing windows with energy-efficient tempered glass that will not shatter during seismic activity or severe windstorms, and will reduce energy loss from heating and air conditioning.

Hazards Mitigated:Earthquake, Severe Storms
Existing 6, 9, 11 Facilities
Services
High Staff Time, General Funds,
Grant Funding- FEMA HMA (BRIC, HMGP)
Short Term
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date
Acronyms used here are defined at the beginning of this volume.

Table 12-12.Mitigation Action Priority
Action #
# of
Objectives
Met BenefitsCosts
Do Benefits
Equal or
Exceed Cost?
Is Project
Grant-
Eligible?
Can Project Be Funded
Under Existing
Programs/ Budgets?
Implementation
Prioritya
Grant
Pursuit
Prioritya
1 3 High High Yes Yes No Medium High
2 2 Medium Low Yes No Yes High Low
3 2 High Medium Yes Yes No Medium High
4 6 High High Yes Yes No Medium High
5 5 High High Yes Yes No Medium High
6 5 High Medium Yes Yes No Medium High
7 3 High Low Yes Yes No Medium High
8 3 High High Yes Yes No Medium High
a. See the introduction to this volume for explanation of priorities. 889

12. California State University, Channel Islands
12-13
Table 12-13.Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention
Property
Protection
Public
Education &
Awareness
Natural
Resource
Protection
Emergency
Services
Structural
Projects
Climate
Resilient
Community
Capacity
Buildingb
Medium-Risk Hazards
Earthquake CSU-1, 8 CSU-2 CSU-3 CSU-3 CSU-2
Severe Storms CSU-1, 8 CSU-2 CSU-3 CSU-3 CSU-4 CSU-2
Severe Weather CSU-6 CSU-2 CSU-3, 5 CSU-3 CSU-5 CSU-5 CSU-2 Dam Failure CSU-2 CSU-3 CSU-3 CSU-2
Flooding CSU-1, 6 CSU-2 CSU-3, 5 CSU-3 CSU-4, 5 CSU-5 CSU-2 Landslide CSU-1 CSU-2 CSU-3 CSU-3 CSU-2
Wildfire CSU-2 CSU-3, 7 CSU-3 CSU-2, 7
Low-Risk Hazards
Drought CSU-2 CSU-3, 5 CSU-3 CSU-5 CSU-5 CSU-2
a. See the introduction to this volume for explanation of mitigation types. b. Note that the jurisdiction did not identify a need for expansion of technical and administrative or financial capabilities, based on existing capabilities. The intent of this hazard mitigation plan is to expand the financial capability of the jurisdiction.

12.8 PUBLIC OUTREACH
Table 12-14 lists public outreach activities for this jurisdiction.

Table 12-14.Local Public Outreach
Local Outreach Activity Date
Number of People
Involved
VC VOADGeneral Membership Meeting June 17, 2021 40
VC VOAD Executive Board Meeting June 9, 2021 7
VC VOAD General Membership Meeting September 16, 2021 50 Postings on Facebook, Twitter July 2021-September 2021 400+

12.9 INFORMATION SOURCES USED FOR THIS ANNEX
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex.

Executive Order 987, Building Operations and Maintenance—Reviewed for the capabilities assessment and action plan development.

Policy Number: FA.32.003 Strategic Risk Management—Reviewed for the capabilities assessment.

Communicable Disease Response Plan—Reviewed for the capabilities assessment.

CSU Channel Islands Exterior Building Management Plan—Reviewed for the capabilities assessment and action plan development.

Executive Order, Policy on Occupational Safety—Reviewed for the capabilities assessment. 890
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 12-14
Emergency Operations Plan—Reviewed for the capabilities assessment and action plan development.

Executive Order, Business Continuity Plan—Reviewed for the capabilities assessment.

The following outside resources and references were reviewed:

Hazard Mitigation Plan Annex Development Toolkit—The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan.

Ventura County Hazard Mitigation Plan 2015—The previous hazard mitigation plan was reviewed when developing mitigation actions.

Cal OES Hazard Mitigation Plan 2018—The state hazard mitigation plan was reviewed when developing mitigation actions.

12.10 FUTURE NEEDS TO BETTER UNDERSTAND RISK/VULNERABILITY Workshops, training and education for the campus community.

Develop and strengthen a campus Hazard Mitigation Planning Team.

Hire a Risk Manager for the campus.
891
13-1

13. CALLEGUAS MUNICIPAL WATER DISTRICT

13.1 LOCAL HAZARD MITIGATION PLANNING TEAM
Primary Point of Contact Alternate Point of Contact
Daniel Cohen, Emergency Response
Coordinator
2100 E. Olsen Road
Thousand Oaks, CA 91360
Telephone: 805-579-7134
e-mail Address: [email protected]
Rob Peters, Manager of Operations and
Maintenance
2100 E. Olsen Road
Thousand Oaks, CA 91360
Telephone: 805-579-7136
e-mail Address: [email protected]
This annex was developed by the local hazard mitigation planning team, whose members are listed in Table 13-1.

Table 13-1.Local Hazard Mitigation Planning Team Members Name Title
Daniel Cohen Emergency Response Coordinator
Rob Peters Manager of Operations and Maintenance
Kristine McCaffrey Manager of Engineering
Dan Drugan Manager of Resources
Sue Taylor Accounting Supervisor
Julio Reyes Operations Supervisor

13.2 JURISDICTION PROFILE

13.2.1 Overview
The Calleguas Municipal Water District (Calleguas, District) was formed in 1953 as voters in southern Ventura County were faced with limited local water supplies, recurring droughts, and an expanding population and economy. In 1960, Calleguas joined the Metropolitan Water District of Southern California (Metropolitan) as a way of securing water from the state water system. The District’s mission is to provide its service area with a reliable supplemental supply of regional and locally developed water in an environmentally and economically responsible manner.

Calleguas is an independent special district with 70 employees who work in Administrative Services, Engineering, Operations and Maintenance, and Resources divisions. The District operates on funding that comes primarily through operating revenues and water rates, and is supplemented by non- operating revenues and investment earnings.
892
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 13-2
Calleguas is governed by an elected five-member Board of Directors, which assumes responsibility for the adoption of this plan. The General Manager will oversee the plan’s implementation.

13.2.2 Service Area
Calleguas is a wholesale water provider that imports and distributes water from Metropolitan through the State Water Project. A majority of the District’s water supply is treated at Metropolitan’s Jensen Treatment Facility in Granada Hills and conveyed into Calleguas’ distribution system. Calleguas does not deliver water directly to consumers, but serves high quality drinking water to 19 retail purveyors within its service area that then deliver water to residents and municipal and agricultural customers.

The District serves an area of approximately 366 square miles in southeast Ventura County and an estimated 635,000 residents, or roughly three quarters of Ventura County’s population. Communities served by Calleguas include the cities of Camarillo, Moorpark, Oxnard, Port Hueneme, Simi Valley, and Thousand Oaks; and the unincorporated areas of Bell Canyon, Camarillo Estates, Camarillo Heights, Lake Sherwood, Naval Base Ventura County, Oak Park, Santa Rosa Valley, and Somis.

Calleguas’ distribution system is made up of 140 miles of large diameter transmission pipelines, 12 potable water reservoirs, 6 potable water pump stations, 5 hydroelectric generators, 20 pressure regulating stations, and 91 service connections (turnouts). The District also owns and operates Lake Bard, an earthen open-surface reservoir, and associated water filtration plant, as well as an aquifer storage and recovery (ASR) project with 18 ASR wells and an associated disinfection facility.

13.2.3 Assets
Table 13-2 summarizes the assets of the District and their value.

Table 13-2.Special-Purpose District Assets
Asset Value
Property
887 acres Unknown
Equipment
Calleguas Conduit Surge Relief Facility $267,749
Conejo Generating Station $1,627,029
Conejo Mobile Standby Generators Unknown
Conejo Standby Generators $3,337,558
Crestview Interconnection $1,560,585
Distribution System Pipelines: 140 miles, various diameters (14”-78”) Unknown East Portal Standby Generator $71,822
Emergency Pipe Yard $1,759,356
Fairview Standby Generator Unknown
Grandsen Generating Station $1,166,850
Grandsen Standby Generators $2,908,577
Grandsen Surge Tank $612,825
Mesa Pressure Relief Station $2,187,000
Pressure Regulating Station 1 $35,034
893

13. Calleguas Municipal Water District
13-3
Asset Value
Pressure Regulating Station 1A $35,034
Pressure Regulating Station 2 $219,790
Pressure Regulating Station 3 $42,621
Pressure Regulating Station 4 $69,781
Pressure Regulating Station 5 $42,621
Pressure Regulating Station 6 $133,355
Pressure Regulating Station 6A $42,621
Pressure Regulating Station 7 $42,621
Pressure Regulating Station 8 $42,621
Pressure Regulating Station 9 $52,286
Reg Station 6 Standby Generator $9,965
Reg Station 9 Standby Generator Unknown
Santa Rosa Generating Station $952,557
Santa Susana Tunnel Unknown
Salinity Management Pipeline (SMP) Phase 1A $13,579,369 SMP Phase 1B $13,617,662
SMP Phase 1C $8,978,601
SMP Phase 1D $4,858,495
SMP Phase 1E $32,756,801
SMP Phase 2A $8,636,675
SMP Phase 2B $13,260,190
SMP Phase 2C $5,743,806
SMP Phase 2D $4,939,862
SMP Hueneme Outfall $21,352,277
Springville Flow Control Facility $1,440,415
Springville Generating Station $3,053,878
Springville Standby Generators Unknown
Vehicle Fleet Unknown
Well 1 $777,480
Well 2 $777,480
Well 3 $777,480
Well 4 $777,480
Well 5 $773,964
Well 6 $1,143,577
Well 7 $1,141,924
Well 8 $836,705
Well 9 $1,154,833
Well 10 $881,306
Well 11 $768,269
Well 12 $773,964
Well 13 $774,560
Well 14 $836,705
Well 15 $1,066,882
894
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 13-4
Asset Value
Well 16 $1,066,883
Well 17 $806,428
Well 18 $814,091
Wellfield Standby Generators Unknown
Total: $165,388,300
Critical Facilities
Calleguas Administration Building $4,909,768
Conejo Pump Station $4,225,361
Conejo Reservoir Unknown
East Portal $3,513,041
Fairview Pump Station $1,584,922
Grandsen Pump Station 1 $5,344,699
Grandsen Pump Station 2 $2,486,828
Grimes Canyon Disinfection Facility $3,235,725
Lake Bard $2,795,730
Lake Bard Water Filtration Plant $14,377,027
Lake Sherwood Pump Station Unknown
Lake Sherwood Reservoir $1,503,910
Lindero Pump Station $2,526,679
Lindero Reservoir $3,198,563
Newbury Park Reservoir $1,900,000
SMP Control Tank $3,708,277
Springville Reservoir A $1,109,000
Springville Reservoir B $4,139,655
Thousand Oaks Reservoir $12,980,000
TOD Pump Station $2,064,923
West Portal Overflow Structure $1,463,000
Westlake Reservoir $12,745,905
Wood Ranch Dam Unknown
Total: $89,813,013

13.3 CURRENT TRENDS
When Calleguas joined Metropolitan in 1960, its service area was approximately 270 square miles. The Calleguas service area reached 366 square miles in 2010. Since 2000, the frequency and size of annexations into Calleguas’ service boundary have slowed considerably. Future annexations are anticipated to continue at a relatively small size and rate, and Calleguas has no plans to significantly expand its service area.

13.4 CAPABILITY ASSESSMENT
This section describes an assessment of existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning. 895

13. Calleguas Municipal Water District
13-5
Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table in this annex identifies these as community capacity building mitigation actions. The findings of the assessment are presented as follows:

An assessment of planning and regulatory capabilities is presented in Table 13-3.

An assessment of fiscal capabilities is presented in Table 13-4.

An assessment of administrative and technical capabilities is presented in Table 13-5.

An assessment of education and outreach capabilities is presented in Table 13-6.

Classifications under various community mitigation programs are presented in Table 13-7.

The community’s adaptive capacity for the impacts of climate change is presented in Table 13-8.

Table 13-3.Planning and Regulatory Capability
Plan,Study or Program Date of Most Recent UpdateComment Capital Improvement Program 2021 Updated at least annually, covers a 5-year timeframe.

Emergency Action Plan & Inundation
Maps for Wood Ranch Dam
2020-21 Updated at least every 10 years in accordance with California Water Code 6160-6161.

Emergency Response Plan 2020 Updated regularly andself-certified with EPAat least every 5 years in accordance with America’s Water Infrastructure Act of 2018.

Master Plan 2017 Updated as needed.

Risk and Resilience Assessment 2020 Updated and self-certified with EPA every 5 years in accordance with America’s Water Infrastructure Act of 2018.

Urban Water Management Plan 2021 Updated every 5 years in accordance with the Urban Water Management Planning Act.

Water Supply Alternatives Study Ongoing Evaluation of potential approaches to meet water supply needs during a 6-month outage of imported water.

Table 13-4.Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants No
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes No
User Fees for Water, Sewer, Gas or Electric Service No
If yes, specify:Calleguas does not directly provide water to homes or businesses, therefore customer user fees are not directly collected. User fees are collected by the District’s purveyors, which ultimately contribute to funding sources used by those purveyors to purchase water from Calleguas.

Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds No
Incur Debt through Private Activity Bonds No
Withhold Public Expenditures in Hazard-Prone Areas No
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers No 896
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 13-6
Table 13-5.Administrative and Technical Capability
Staff/Personnel Resource Available?
Planners or engineers with knowledge of land development and land management practices Yes If Yes, Department /Position:This resource is available through contract support.

Engineers or professionals trained in building or infrastructure construction practices Yes If Yes, Department /Position:Engineering Department / Manager of Engineering, Project Managers, and Inspectors.

Planners or engineers with an understanding of natural hazards Yes If Yes, Department /Position:Engineering Department/Manager of Engineering, Project Managers, andInspectors.

Staff with training in benefit-cost analysis Yes
If Yes, Department /Position:This resource is available through contract support.

Surveyors Yes
If Yes, Department /Position:This resource is available through contract support.

Personnel skilled or trained in GIS applications Yes
If Yes, Department /Position:Administrative Services Department/Information Technology Specialist.

Scientist familiar with natural hazards in local area Yes If Yes, Department /Position:This resource is available through contract support.

Emergency manager Yes
If Yes, Department /Position:Operations & Maintenance Department / Emergency Response Coordinator.

Grant writers Yes
If Yes, Department /Position:Engineering Department / Manager of Engineering.

Procurement Services and Management Yes
If Yes, Department /Position:Administrative Services Department, Operations & Maintenance Department / General Services Division.

Table 13-6.Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? Yes If yes, briefly describe:Information is available regarding specific plans and capital projects that relate to specific hazard mitigation activities.

Do you use social media for hazard mitigation education and outreach? Yes If yes, briefly describe:Public educationthrough social mediais focused on drought mitigation and water conservation.

Do you have any citizen boards or commissions that address issues related to hazard mitigation? No Do you have any other programs in place that could be used to communicate hazard-related information? Yes If yes, briefly describe:Calleguas organizes a banner distribution program and displays signage related to drought mitigation in coordination with water purveyors throughout Ventura County.

Do you have any established warning systems for hazard events? Yes If yes, briefly describe:Public warning notification procedures are established for potential safety incidents involving a dam breach or failure, as well as hazards not included in this HMP.
897

13. Calleguas Municipal Water District
13-7
Table 13-7.Community Classifications
Participating? Classification Date Classified
FIPS Code No N/A N/A
DUNS# Yes 010726883 N/A
Community Rating System No N/A N/A
Building Code Effectiveness Grading Schedule No N/A N/A Public Protection No N/A N/A
Storm Ready No N/A N/A
Firewise No N/A N/A
Tsunami Ready No N/A N/A
Table 13-8.Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts High Comment: Calleguas’ elected officials and managerial staff understand that climate change is real and requires planned actions to mitigate its impacts.

Jurisdiction-level monitoring of climate change impacts High Comment: Calleguas regularly monitors climate change impacts on snowpack, water supply conditions, drought, and wildfires.

Technical resources to assess proposed strategies for feasibility and externalities High Comment: Calleguas has organized and participated in plans and programs that assess mitigation strategies, in addition to utilizing contract support.

Jurisdiction-level capacity for development of greenhouse gas emissions inventory High Comment: The Calleguas distribution system is primarily a gravity-fed system that generates more power than it uses on an annual basis.

Capital planning and land use decisions informed by potential climate impacts High Comment: Calleguas complies with the California Environmental Quality Act (CEQA) for projects, which includes an evaluation of climate impacts.

Participation in regional groups addressing climate risks High Comment: Calleguas Directors and staff actively participate in multiple groups focused on addressing climate risks and impacts, including the Watersheds Coalition of Ventura County and the Ventura County Regional Energy Alliance.

Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes High Comment: Processes in CEQA require climate change impacts to be considered.

Identified strategies for greenhouse gas mitigation efforts High Comment: Strategies to mitigate greenhouse gas emissions have been identified and continue to be explored, including additional hydroelectric power generation, water use efficiency programs, and eventual transition of the District’s fleet to electric vehicles.

Identified strategies for adaptation to impacts High
Comment: Calleguas actively participates in integrated water resource planning and local water resource development to increase local resilience and reduce reliability on imported water.

Champions for climate action in local government departments High Comment: Water resources personnel at Calleguas actively organize and coordinate water conservation efforts with local cities, utilities, special districts, and the public across Ventura County. 898
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 13-8
Criterion Jurisdiction Ratinga
Political support for implementing climate change adaptation strategies High Comment: The District’s elected officials actively support strategies that direct preparedness and support measures that encourage adaptability to climate change impacts. Additionally, state and federal representatives serving regions in the District’s service area traditionally support legislation intended to mitigate impacts created by climate change.

Financial resources devoted to climate change adaptation High Comment: Water use efficiency programs financially incentivize efforts to conserve water. Financial resources are also dedicated to capital improvement planning projects, such as development of local water resources and resiliency of water system components, that may be impacted by climate change.

Local authority over sectors likely to be negative impacted High Comment: Calleguas has jurisdiction over its water supply.

Public Capacity
Local residents’ knowledge of and understanding of climate risk Medium Comment: Public capacity is measured in accordance with municipalities and unincorporated areas of Ventura County located in the District’s service area.

Local residents’ support of adaptation efforts Medium
Comment: Public capacity is measured in accordance with municipalities and unincorporated areas of Ventura County located in the District’s service area.

Local residents’ capacity to adapt to climate impacts Medium Comment: Public capacity is measured in accordance with municipalities and unincorporated areas of Ventura County located in the District’s service area.

Local economy current capacity to adapt to climate impacts Medium Comment: Public capacity is measured in accordance with municipalities and unincorporated areas of Ventura County located in the District’s service area.

Local ecosystems capacity to adapt to climate impacts Medium Comment: Public capacity is measured in accordance with municipalities and unincorporated areas of Ventura County located in the District’s service area.
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.

13.5 INTEGRATION REVIEW
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed at the end of this annex were used to provide information on integration. The progress reporting process described in Volume 1 of the hazard mitigation plan will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration.

13.5.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs:

Capital Improvement Program—The Capital Improvement Program includes projects that can help mitigate potential hazards, as well as address the potential impacts of those hazards on operations and water supply. The District will act to ensure consistency between the HMP and 899

13. Calleguas Municipal Water District
13-9
the current and future capital improvement program. The HMP may identify new possible funding sources for capital improvement projects and may result in modifications to proposed projects based on results of the risk assessment.

Emergency Response Plan—The Emergency Response Plan describes procedures and operations to be executed by Calleguas staff in the event of various types of disasters or emergency situations. Response procedures and action plans, specifically for natural hazards, incorporate mitigation planning efforts recognized in the HMP in order to minimize the impacts to District facilities, infrastructure, equipment, staff, and the public.

Master Plan—The Master Plan includes projects that can help address the potential impacts of hazards on operations and water supply. The District will act to ensure consistency between the HMP and the Master Plan.

Risk and Resilience Assessment—The Risk and Resilience Assessment identifies and evaluates hazards that present the highest risk to the District’s infrastructure and measures the resiliency of the District’s system against those hazards, including natural hazards.

Countermeasures that mitigate impacts and vulnerabilities associated with high-risk hazards are evaluated, including potential mitigation actions that are also recognized and described in the HMP.

Urban Water Management Plan—The Urban Water Management Plan outlines and assesses long-term water resource planning as local and state supplies continually experience highly variable hydrology and impacts of climate change. Water service reliability, water use efficiency efforts, and contingency planning aspects of the Urban Water Management Plan integrate the HMP by incorporating potential mitigation actions.

Water Supply Alternatives Study—The Water Supply Alternatives Study includes projects that can help address the potential impacts of hazards on operations and water supply. The District will act to ensure consistency between the HMP and Water Supply Alternatives Study.

13.5.2 Opportunities for Future Integration
The capability assessment in this annex indicates opportunities to integrate this mitigation plan with other jurisdictional planning/regulatory capabilities. Capabilities were identified as integration opportunities if they can support or enhance the actions identified in this plan or be supported or enhanced by components of this plan. The capability assessment identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future:

Business Continuity Plan—The District may assess its existing Business Continuity Plan to expand the plan and update it in accordance with the HMP.

Post-Disaster Recovery Plan—The District may consider preparing a Post-Disaster Recovery Plan that would emphasize the planning goals and strategies identified in the HMP during long- term recovery efforts.

Power Outage Response Plan—The District plans to develop an action plan specifically for responding to various types of power outages, including Public Safety Power Shutoffs (PSPS) and extended blackouts. This plan will incorporate mitigation objectives and other measures identified in the HMP.
900
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 13-10
Taking action to integrate each of these programs with the hazard mitigation plan was considered as a mitigation action to include in the action plan in this annex.

13.6 RISK ASSESSMENT

13.6.1 Jurisdiction-Specific Natural Hazard Event History Table 13-9 lists past occurrences of natural hazards for which specific damage was recorded in this jurisdiction Other hazard events that broadly affected the entire planning area, including this jurisdiction, are listed in the risk assessments in Volume 1 of this hazard mitigation plan.

Table 13-9.Past Natural Hazard Events
Type of
Event
FEMA
Disaster # Date Damage Assessment
COVID-19
Pandemic
DR-4482 01/20/2020 Ongoing.

Easy Fire FM-5298 10/30/2019The Easy Fire occurred just north of the District’s main facility, interrupting normal operations and requiring most staff to evacuate the property. Although no District facilities were directly impacted, the District’s water supply was used for firefighting efforts via distribution pipelines and aerial surface water dips in Lake Bard. 2018 Fires DR-4407 11/08/2018The Hill and Woolsey Fires both occurred inside separate areas of the District’s service territory. Although no District facilities were directly impacted, the District’s water supply was used for firefighting efforts via distribution pipelines and aerial surface water dips in Lake Bard. Power outages caused by the fire also created operational challenges and complications.

Thomas
Fire
FM-5224 12/04/2017 District staffprovided mutual aid and support to water agencies impacted by this fire, including staffing the water infrastructure liaison position in the County EOC.

Springs
Fire
FM-5024 05/02/2013The District’s water supply was used for firefighting efforts.

Guiberson
Fire
FM-2839 09/22/2009The District’s water supply was used for firefighting efforts.

Shekell FireFM-2681 12/03/2006 The Shekell Fire burned through the District’s Wellfield facility but caused minimal damage to equipment and infrastructure. The District’s water supply was used for firefighting efforts.

Topanga
Fire
FM-2583 09/28/2005The District’s water supply was used for firefighting efforts.

Severe
Storms
DR-1577 12/27/2004$121,296.45
Simi Fire DR-1498 10/21/2003The District’s water supply was used for firefighting efforts.

Northridge
Earthquake
DR-1008 01/17/1994The District incurred multiple significant pipeline failures and suffered damages on other components related to the distribution system, reaching costs totaling several hundreds of thousands of dollars to repair or replace assets.

13.6.2 Hazard Risk Ranking
Table 13-10 presents a local ranking of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on 901

13. Calleguas Municipal Water District
13-11
people, property, and district operations. Mitigation actions primarily target hazards with high and medium rankings.

Table 13-10.Hazard Risk Ranking
Rank Hazard Risk Ranking Score Risk Category
1 Earthquake 32 High
1 Wildfire 32 High
3 Drought 31 High
4 Severe Weather 24 Medium
4 Severe Storms 24 Medium
6 Dam Failure 21 Medium
7 Landslide 18 Medium
8 Flooding 15 Low
9 Sea Level Rise 2 Low
9 Tsunami 2 Low

13.6.3 Other Noted Vulnerabilities
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. The following jurisdiction-specific issues have been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources:

Strong to severe ground shaking and liquefaction produced by an earthquake on one of many nearby faults could result in significant simultaneous damages to several assets and critical facilities across the District’s service area.

Numerous District assets and critical facilities are located in a very high wildfire severity zone, including multiple pump stations, reservoirs, and water treatment facilities containing hazardous materials.

Long-term statewide and regional drought could impact the District’s imported water supply and strain local water resources and emergency reserves.

The Santa Susana Tunnel conveys imported water from Metropolitan Water District into the Calleguas distribution system. An impact to the tunnel caused by an earthquake or other natural hazard could completely cut off imported water until the tunnel is repaired or temporary infrastructure is installed.

Mitigation actions addressing these issues were prioritized for consideration in the action plan in this annex.

13.7 STATUS OF PREVIOUS PLAN ACTIONS
Table 13-11 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared. 902
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 13-12
Table 13-11.Status of Previous Plan Actions
Removed;
CarriedOver to Plan
Update
Action Item from Previous Plan Completed
No Longer
Feasible
Check if
Yes
Action #in
Update
OA 9—Identify potentially vulnerable public and private utility systems including electric, gas, oil, water, sewer and communication. Upgrade vulnerable systems to ensure the operation and timely restoration of essential systems to reasonable levels of service.

CAL-6
Comment:Although Calleguas has completed several projects to mitigate earthquake hazards, this action item is evergreen and will always remain relevant to Calleguas.

OA 16—Implement landslide stabilization and/or protection measures. Stabilization measures include grading the unstable portion of the slope to a lower gradient, construction of rock buttresses and retaining walls, and drainage improvements.

Protection measures include containment and/or diversion of the moving debris, such as walls, berms, ditches and catchment basins.

CAL-7
Comment:Calleguas has completed several efforts to mitigate hazards related to erosion and drainage. However, this action item will always remain relevant to Calleguas.

OA 21—Maintain hazards fuel treatment program for areas that have been identified with overgrown/dead brush/trees to reduce the potential for tree-to-tree ignition. Ensure that a “maintenance now” component to provide continued fire resistance is part of the program.

CAL-8
Comment:Calleguas maintains a brush clearing and defensible space program to mitigate wildfire risks. These mitigation efforts are completed regularly and will always remain relevant to Calleguas.

13.8 HAZARD MITIGATION ACTION PLAN
Table 13-12 lists the actions that make up the hazard mitigation action plan for this jurisdiction.

Table 13-13 identifies the priority for each action. Table 13-14 summarizes the mitigation actions by hazard of concern and mitigation type.

Table 13-12.Hazard Mitigation Action Plan Matrix
BenefitsNew or
Existing Assets
Objectives
Met Lead Agency
Support
Agency
Estimated
Cost Sources of Funding Timelinea
Action CAL-1—Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.

Hazards Mitigated:Earthquake, Wildfire, Dam Failure, Landslide, Flooding Existing 2, 6, 9, 18 Calleguas MWD Various TBD CIP Funds, HMGP/BRIC Grant Funding
Long-term
Action CAL-2—Improve imported water supply reliability by seismically upgrading Calleguas’ Santa Susana Tunnel, which was constructed in the early 1960s.

Hazards Mitigated:Earthquake
Existing 2, 6, 9, 18 Calleguas MWD N/A $4M CIP Funds, HMGP/BRIC Grant Funding
Long-term
CAL-3—Improve water supply reliability and reduce risk of critical pipeline failure during an earthquake by rehabilitating and/or strengthening segments of Prestressed Concrete Cylinder Pipe (PCCP) in the District’s distribution system that are vulnerable to “broken back” failures.

Hazards Mitigated:Earthquake
Existing 2, 6, 9, 18 Calleguas MWD N/A $10M CIP Funds, HMGP/BRIC Grant Funding
Short and
long-term
(phased project)
903

13. Calleguas Municipal Water District
13-13
BenefitsNew or
Existing Assets
Objectives
Met Lead Agency
Support
Agency
Estimated
Cost Sources of Funding Timelinea
Action CAL-4—Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.

Hazards Mitigated:All Hazards
New/Existing 1, 4, 6, 8, 19 Calleguas MWD N/A Low Staff Time, General Funds Short-term Action CAL-5—Purchase generators for critical facilities and infrastructure that lack adequate backup power as listed below.

Hazards Mitigated:Earthquake, Wildfire, Severe Weather, Severe Storms, Dam Failure, Landslide, Flooding Existing, Lindero
Pump Station
2,6, 18 Calleguas MWD N/A $1.3M CIP Funds, BRIC Grant Funding (pending)
Short-term
Existing, Lake
Sherwood Pump
Station
2, 6, 18 Calleguas MWD N/A $340,000 CIP Funds,
HMGP/BRIC Grant Funding
Short-term
Action CAL-6—Identify potentially vulnerable public waterutility systems. Upgrade vulnerable systems under the District’s authority to ensure the operation and timely restoration of essential systems to reasonable levels of service.

Hazards Mitigated:All Hazards
New/Existing 2, 6, 9 Calleguas MWD N/A Medium General Funds, HMGP/BRIC Grant Funding
Ongoing
Action CAL-7—Implement landslide stabilization and/or protection measures. Stabilization measures include grading the unstable portion of the slope to a lower gradient, construction of rock buttresses and retaining walls, and drainage improvements. Protection measures include containment and/or diversion of the moving debris, such as walls, berms, ditches and catchment basins.

Hazards Mitigated:Landslide
New/Existing 2, 6, 9 Calleguas MWD N/A Medium CIP Funds, HMGP/BRIC Grant Funding
Ongoing
Action CAL-8—Maintain wildfire hazard fuel reduction program for areas that have been identified with overgrown or dead brush, trees and weeds to reduce the potential for tree-to-tree ignition. Ensure that a “maintenance now” component to provide continued fire resistance is part of the program. (Coordinates with Ventura County Fire Protection District Action VFP-6) Hazards Mitigated:Wildfire
Existing 5,13,14 Calleguas MWD N/A Low General Funds, HMGP/BRIC Grant Funding
Ongoing
Action CAL-9—Implement projects to help address water supply needs during a 6-month imported water outage.

Hazards Mitigated:Earthquake, Drought
New 2, 6, 18 Calleguas MWD Various TBD CIP Funds, IRWM/HMGP/ BRIC Grant Funding
Long-term
Action CAL-10—The Las Virgenes-Calleguas Interconnection is a cost-effective, mutually beneficial pipeline that can deliver water between agencies if one were to experience a complete or partial water supply interruption that did not significantly affect the other agency.

Hazards Mitigated:Earthquake
New 2, 3, 6, 8, 18Calleguas MWDLas Virgenes
Municipal Water
District
$30M CIP Funds, Proposition 1 IRWM
Grant Funding
Short-term
Action CAL-11—The Calleguas-Ventura Interconnection is a cost-effective, mutually beneficial pipeline that will be utilized to improve water system reliability for both agencies during water supply shortages that may not significantly affect both jurisdictions at the same time.

Hazards Mitigated:Earthquake, Drought
New 2, 3, 6, 8, 18 Calleguas MWDCity of Ventura $21M CIP Funds, IRWM/HMGP/ BRIC Grant Funding
Short-term
904
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 13-14
BenefitsNew or
Existing Assets
Objectives
Met Lead Agency
Support
Agency
Estimated
Cost Sources of Funding Timelinea
Action CAL-12—The Crestview Well No.8 project involves construction and installation of a new groundwater well, associated components and system connections necessary to deliver water from Crestview Mutual Water Company to Calleguas during an imported water outage.

Hazards Mitigated:Earthquake
New 2, 6, 8, 18 Crestview
Mutual Water
Company
Calleguas MWD$2.4M CIP Funds Short-term
Action CAL-13—Lake Bard Pump Station will enable the treatment of approximately 30% of water in Lake Bard that cannot currently be treated by the Lake Bard Water Filtration Plant due to insufficient hydraulic head by pumping that water through the treatment process.

This water would likely only need to be treated during a major imported water outage, which could be caused by an earthquake.

Hazards Mitigated:Earthquake
New 2, 6, 18 Calleguas MWD N/A $6M CIP Funds Short-term Action CAL-14—Fairview Well Rehabilitation will help the District meet demands during imported water outages by rehabilitating and performing upgrades on system components to enable operation of Fairview Well, an aquifer storage and recovery well that has not operated since 1998.

Hazards Mitigated:Earthquake
New 2, 6, 18 Calleguas MWD N/A $2M CIP Funds, HMGP/BRIC Grant Funding
Short-term
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date; Acronyms used here are defined at the beginning of this volume.

Table 13-13.Mitigation Action Priority
Action #
# of
Objectives
Met BenefitsCosts
Do Benefits
Equal or
Exceed Cost?
Is Project
Grant-
Eligible?
Can Project Be Funded
Under Existing
Programs/ Budgets?
Implementation
Prioritya
Grant
Pursuit
Prioritya
CAL-1 4 High Medium Yes Yes No Medium High
CAL-2 4 High Medium Yes Yes Yes High High
CAL-3 4 High Medium Yes Yes Yes High High
CAL-4 5 Medium Low Yes No Yes High Low
CAL-5 3 High Low Yes Yes Yes High High
CAL-6 3 High Medium Yes Yes No Medium High
CAL-7 3 High Medium Yes Yes No Medium High
CAL-8 3 High Low Yes Yes Yes High High
CAL-9 3 High Medium Yes Yes No Medium High
CAL-10 5 High Medium Yes Yes Yes High High
CAL-11 5 High Medium Yes Yes Yes High High
CAL-12 4 High Medium Yes Yes Yes High High
CAL-13 3 High Medium Yes Yes Yes High High
CAL-14 3 High Medium Yes Yes Yes High High
a. See the introduction to this volume for explanation of priorities. 905

13. Calleguas Municipal Water District
13-15
Table 13-14.Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention
Property
Protection
Public
Education &
Awareness
Natural
Resource
Protection
Emergency
Services
Structural
Projects
Climate
Resilient
Community
Capacity
Buildingb
High-Risk Hazards
Earthquake CAL-9 CAL-1, 2, 3, 9 CAL-4 CAL-5, 6 CAL-1, 9, 10, 11, 12, 13
CAL-4, 6, 9, 10,
11, 12, 13, 14
Wildfire CAL-8 CAL-1, 8 CAL-4 CAL-8 CAL-5, 6, 8 CAL-1 CAL-4, 6, 8 Drought CAL-9 CAL-4 CAL-9, 11 CAL-9, 11 CAL-4, 6, 9, 11 Medium-Risk Hazards
Severe Weather CAL-4 CAL-5, 6 CAL-4, 6
Severe Storms CAL-4 CAL-5, 6 CAL-4, 6
Dam Failure CAL-1 CAL-4 CAL-5, 6 CAL-1 CAL-4, 6
Landslide CAL-1, 7 CAL-4 CAL-7 CAL-5, 6 CAL-1, 7 CAL-4, 6, 7 Low-Risk Hazards
Flooding CAL-1 CAL-5, 6 CAL-1 CAL-4, 6
Sea Level Rise CAL-4, 6
Tsunami CAL-4, 6
a. See the introduction to this volume for explanation of mitigation types. b. Note that the jurisdiction did not identify a need for expansion of financial capabilities, based on existing capabilities. The intent of this hazard mitigation plan is to expand the financial capability of the jurisdiction.

13.9 PUBLIC OUTREACH
Table 13-15 lists public outreach activities for this jurisdiction.

Table 13-15.Local Public Outreach
Local Outreach Activity Date
Number of
People Involved
Calleguas board resolution calling for water conservation to reduce demand by 15% 11/17/2021 15 Los Angeles Department of Water and Power (to shift-off state water project supplies), Metropolitan, Las Virgenes, and Calleguas drought press release 10/05/2021 15
Calleguas social media blast promoting public participation in the multi-hazard mitigation plan update
08/02/2021 N/A
Calleguas board adoption of stage 2 drought condition 08/18/2021 15 Calleguas board adoption of stage 4 drought condition—implementation of mandatory conservation
04/15/2015 15
Calleguas board resolution calling for increased water use efficiency 02/05/2014 25

13.10 INFORMATION SOURCES USED FOR THIS ANNEX
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex.

Capital Improvement Program—The Capital Improvement Program prioritizes projects that have been identified to improve District facilities, infrastructure, and equipment, including 906
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 13-16
potential mitigation projects. The Capital Improvement Program was used as a source of information while preparing this annex.

Emergency Response Plan—The District’s Emergency Response Plan provides response procedures to various emergency incidents, including natural disasters. Several emergency response procedures and operations are intended to mitigate impacts of the incident. This information was reviewed and supported the development of this annex.

Master Plan—The District’s Master Plan includes projects that could mitigate the impacts of natural hazards on the water supply and distribution system. This information was referenced during the development of this annex.

Risk and Resilience Assessment—The Risk and Resilience Assessment identifies the natural hazards that pose the largest risk to the District’s water supply and infrastructure. Additionally, potential countermeasures to prevent or mitigate risks are included in the assessment. These aspects of the Risk and Resilience Assessment supported the development of this annex.

Urban Water Management Plan—The Urban Water Management Plan provides information on water supplies, demands, and strategies to conserve water and mitigate impacts from natural hazards that could impact the distribution system. Information from the Urban Water Management Plan was utilized to support this annex.

Water Supply Alternatives Study—The Water Supply Alternatives Study focuses on potential projects that could improve the District’s water supply portfolio and ultimately increase local resiliency. Ideas in the Water Supply Alternatives Study were used to assist in the creation of this annex.

The following outside resources and references were reviewed:

California State Hazard Mitigation Plan (SHMP)—The 2018 SHMP was referenced in order to understand the state’s focus, objectives, and strategies related to hazard mitigation. The SHMP also includes an overview of disaster history, statewide risks, successful mitigation actions, and best practices.

Hazard Mitigation Plan Annex Development Toolkit—The toolkit was used to support the identification of past hazard events and noted vulnerabilities, risk ranking, and the development of the mitigation action plan.

Integrated Water Resources Plan (IRP) developed by Metropolitan Water District of Southern California—The 2020 IRP was prepared in concert with Metropolitan’s Urban Water Management Plan and addresses the complexity of developing, maintaining, and delivering water to meet changing demands in face of uncertainties that the Southern California region faces. Climate change experts were consulted throughout the creation of the 2020 IRP, which creates multiple scenarios that could foreseeably occur due to climate change and other factors affecting water resources and demands. The IRP was referenced during development of this annex.

Projected Changes in Ventura County Climate—The 2019 climate change report directed by the Watersheds Coalition of Ventura County projects local climate change impacts from 2021- 2040. Climate factors that were assessed include projected changes in temperature, projected changes in precipitation, projected changes in evaporative demand, and considerations regarding atmospheric rivers, projected snowpack, drought, and wildfire. Calleguas participated in the development of the 2019 report as a wholesale water agency, and referenced the report during the development of this annex in the HMP.
907

13. Calleguas Municipal Water District
13-17
Ventura County Emergency Operations Plan (EOP)—The Ventura County EOP identifies countywide procedures for response to a largescale disaster or emergency incident. The County EOP was used as a resource throughout preparation of this annex.

Water Surplus and Drought Management Plan (WSDM Plan)—Metropolitan Water District’s WSDM Plan provides principles, goals, and potential actions to manage various water supply conditions. The WSDM Plan was used as a supporting document during development of this annex.
908
909
14-1

14. CASITAS MUNICIPAL WATER DISTRICT

14.1 LOCAL HAZARD MITIGATION PLANNING TEAM
Primary Point of Contact Alternate Point of Contact
Julia Aranda, PE, Engineering Manager
1055 Ventura Avenue
Oak View, California 93022
Telephone: 805-649-2251 x107
e-mail Address: [email protected]
Greg Romey, Safety Officer
1055 Ventura Avenue
Oak View, California 93022
Telephone: 805-649-2251 x125
e-mail Address: [email protected]
This annex was developed by the local hazard mitigation planning team, whose members are listed in Table 14-1.

Table 14-1.Local Hazard Mitigation Planning Team Members Name Title
Julia Aranda Engineering Manager
Greg Romey Safety Officer
Kelley Dyer Assistant General Manager

14.2 JURISDICTION PROFILE

14.2.1 Overview
The Casitas Municipal Water District was formed in 1952 (as the Ventura River Municipal Water District). In 1956, the Ventura River Project was authorized by Congress, which included the Robles Diversion facility on the Ventura River, the Robles Canal, and the Casitas Dam. The District is governed by a five-member Board of Directors. Funding is primarily from water rates and revenue bonds.

The Casitas Board of Directors assumes responsibility for the adoption of this plan; Casitas Municipal Water District will oversee its implementation.

14.2.2 Service Area
Casitas provides wholesale and retail water service to western Ventura County and is governed by a five-member elected Board of Directors. Communities served include the City of Ojai, Upper Ojai, the Ventura River Valley area, the City of Ventura (west of Mills Road) and the beach communities of Solimar, La Conchita, and Rincon. Originally named the Ventura River Municipal Water District in 1952, 910
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 14-2
Casitas was formed to provide supplemental water to the agricultural communities in its service area.

The service area also includes residential, commercial, and industrial uses. Wholesale customers include the City of Ventura and several special districts and mutual water companies. Casitas has 60 full-time employees, not including those employed at the Lake Casitas Recreation Area.

Casitas’ service area covers 136 square miles of land (177 square miles including ocean area). As of December 31, 2020, Casitas had 6,130 service connections. In 2017, Casitas acquired the Ojai Water System from Golden State Water Company (GSWC); this did not increase the service area as GSWC was a wholesale customer of Casitas.

14.2.3 Assets
Table 14-2 summarizes the assets of the District and their value. Many of the District’s facilities are on land owned by the United States of America as they were acquired by the US Bureau of Reclamation; these parcels are not included in the table. Casitas operates and maintains the facilities (tanks, pump plants, etc.) on this land.

Table 14-2.Special-Purpose District Assets
Asset Value
Property

98.28acres of land($750,000/acre) $73,710,000
Equipment
163.52 miles of pipeline ($1.25M/mile) $204,400,000

28.19 million gallons of storage tanks ($3/gal) $84,570,000 16 pump plants (PP) (75,075 gpm total capacity x $1,000 per gpm) $75,075,000 Generators $972,000
Vehicles/Heavy Equipment $3,000,000
Total: $441,727,000
Critical Facilities
Avenue No. 1 PP $17,950,000
Gardens PP $80,000
Avenue No. 2 PP $18,800,000
Fairview PP $4,670,000
4M PP $5,300,000
Grand Avenue PP $1,120,000
Upper Ojai PP $4,850,000
3M PP $1,425,000
Ojai Valley PP $10,800,000
Rincon PP $5,150,000
Fortress PP $400,000
San Antonio PP $3,000,000
Signal PP $200,000
Arbolada PP $390,000
Valley View PP $700,000
Heidelberger PP $240,000
Oak View Tank $21,000,000
911

14. Casitas Municipal Water District
14-3
Asset Value
Gardens Tank $33,000
Villanova Tank $19,500,000
Fairview Tank $6,000,000
4M Tank $6,000,000
Upper Ojai Tank $5,400,000
3M Tank $3,000,000
Ojai East Tank $9,000,000
Rincon Control Tank $750,000
Rincon Balancing Tank $7,500,000
Fortress $405,000
San Antonio Forebay $1,500,000
Signal Tank $900,000
Arbolada Tank $3,000,000
Running Ridge Tank $282,000
Heidelberger Tank $300,000
Marion Walker Water Treatment Facility $15,000,000
San Antonio Wellfield Treatment Facility $5,000,000
District Office $5,000,000
Robles Diversion and Fish Passage Facility $20,000,000
San Antonio Plant Generator (500 kW) $500,000
Marion Walker Water Treatment Plan Generator (350 kW) $350,000 Robles Diversion Facility Generator (60 kW) $60,000
Heidelberger PP Booster Generator (37 kW) $37,000
Signal PP Booster Generator (25 kW) $25,000
Vehicles and Heavy Equipment $3,000,000
Total: $208,617,000

14.3 CURRENT TRENDS
Population is not expected to significantly increase over the next ten years and the District has no plans to expand its service area.

14.4 CAPABILITY ASSESSMENT
This section describes an assessment of existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning.

Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table in this annex identifies these as community capacity building mitigation actions. 912
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 14-4
The findings of the assessment are presented as follows:

An assessment of planning and regulatory capabilities is presented in Table 14-3.

An assessment of fiscal capabilities is presented in Table 14-4.

An assessment of administrative and technical capabilities is presented in Table 14-5.

An assessment of education and outreach capabilities is presented in Table 14-6.

Classifications under various community mitigation programs are presented in Table 14-7.

The community’s adaptive capacity for the impacts of climate change is presented in Table 14-8.

Table 14-3.Planning and Regulatory Capability
Plan, Study or Program
Date of Most
Recent UpdateComment
Emergency Action Plan 2021 Prepared by USBR for Casitas Dam Standard Specifications and Details 2021 Prepared by District Emergency Response Plan 2021 Prepared by District
Standard Operating Procedures 2007 Prepared by USBR for Casitas Dam 10 Year Capital Improvement Program 2021 Updated annually by District Table 14-4.Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants No
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes Yes
User Fees for Water, Sewer, Gas or Electric Service Yes If yes, specify:Water
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds Yes
Incur Debt through Private Activity Bonds No
Withhold Public Expenditures in Hazard-Prone Areas No
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers No Table 14-5.Administrative and Technical Capability
Staff/Personnel Resource Available?
Planners or engineers with knowledge of land development and land management practices Yes If Yes, Department /Position:Engineering/Manager
Engineers or professionals trained in building or infrastructure construction practices Yes If Yes, Department /Position:Engineering/Manager
Planners or engineers with an understanding of natural hazards Yes If Yes, Department /Position:Engineering/Manager
Staff with training in benefit/cost analysis Yes
913

14. Casitas Municipal Water District
14-5
Staff/Personnel Resource Available?
If Yes, Department /Position:Administration/Chief Financial Officer Surveyors Yes
If Yes, Department /Position:Through Contract
Personnel skilled or trained in GIS applications Yes
If Yes, Department /Position:Engineering/GIS Technician Scientist familiar with natural hazards in local area Yes If Yes, Department /Position:Engineering/Manager
Emergency manager Yes
If Yes, Department /Position:Management/General Manager Grant writers Yes
If Yes, Department /Position:Through Contract
Other Yes(Operations and
Maintenance/Manager)
Table 14-6.Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? No Do you use social media for hazard mitigation education and outreach? No Do you have any citizen boards or commissions that address issues related to hazard mitigation?No Do you have any other programs in place that could be used to communicate hazard-related information? Yes If yes, briefly describe: Casitas uses our website to post emergency information related to interruptions in service caused by disasters.

Do you have any established warning systems for hazard events? No Table 14-7.Community Classifications
Participating? Classification Date Classified
FIPS Code No N/A N/A
DUNS# Yes 072927973 N/A
Community Rating System No N/A N/A
Building Code Effectiveness Grading Schedule No N/A N/A Public Protection No N/A N/A
Storm Ready No N/A N/A
Firewise No N/A N/A
Tsunami Ready No N/A N/A
914
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 14-6
Table 14-8.Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts High Comment: Casitas understands climate change impacts on local, regional, and Statewide water supplies Jurisdiction-level monitoring of climate change impacts High Comment: Casitas monitors local surface water flows, evaporation rates, and water demands regularly Technical resources to assess proposed strategies for feasibility and externalities Medium Comment: Casitas engages consultants for assistance with water supply alternatives as needed Jurisdiction-level capacity for development of greenhouse gas emissions inventory High Comment: Casitas staff has this capacity
Capital planning and land use decisions informed by potential climate impacts Medium Comment: Casitas manages its own capital planning; Casitas does not have jurisdiction over land use Participation in regional groups addressing climate risks Medium Comment: Casitas participates in Upper Ventura River Groundwater Agency, Ojai GMA, and Watersheds Coalition of Ventura County Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes High Comment: The Board of Directors considers climate change impacts during environmental review of projects under their jurisdiction.

Identified strategies for greenhouse gas mitigation efforts Low Comment: GGs have not been a priority for Casitas
Identified strategies for adaptation to impacts Medium
Comment: Casitas uses its Water Efficiency Allocation Programto implement water conservation requirements based on lake level Champions for climate action in local government departments Medium Comment: The Board participates in regional organizations advocating groundwater management, drought mitigation, and water resources.

Political support for implementing climate change adaptation strategies Medium Comment: Casitas’ Board considers climate change in planning efforts.

Financial resources devoted to climate change adaptation Low Comment: Casitas’ funds for capital projects are limited Local authority over sectors likely to be negative impacted High Comment: Casitas is a wholesale and retail agency. The Water Efficiency Allocation Program allows Casitas to impose conservation and penalties.

Public Capacity
Local residents’ knowledge of and understanding of climate risk Medium Comment: Residents seem to be informed of climate change and impacts to water supply Local residents’ supportof adaptation efforts High
Comment: Residents are very vocal about the need for additional water supplies Local residents’ capacity to adapt to climate impacts High Comment: The majority of customers have surpassed conservation goals Local economy current capacity to adapt to climate impacts Medium Comment: Agricultural customers may have difficulty adapting to climate change impacts to water supply Local ecosystems capacity to adapt to climate impacts Unsure Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. 915

14. Casitas Municipal Water District
14-7

14.5 INTEGRATION REVIEW
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed at the end of this annex were used to provide information on integration. The progress reporting process described in Volume 1 of the hazard mitigation plan will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration.

14.5.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs:
10-year Capital Improvement Plan (CIP)—Mitigation projects are identified and included in the 10-year CIP. Funding may not be available each year to implement mitigation.

Emergency Response Plan (ERP)—Casitas’ ERP identifies all vulnerable facilities and includes response actions to hazards such as earthquake, wildfire, etc.

Emergency Action Plan (EAP)—The EAP prepared by the US Bureau of Reclamation is updated annually and exercises are held on a regular basis with local emergency response agencies.

Urban Water Management Plan (UWMP)—The UWMP describes the District’s water supplies and demands, and identifies water supply projects to mitigate drought Water Efficiency Allocation Program—The Water Efficiency Allocation Program includes implementation of water conservation goals depending on the level of Lake Casitas to assist with drought mitigation.

14.5.2 Opportunities for Future Integration
The capability assessment in this annex indicates opportunities to integrate this mitigation plan with other jurisdictional planning/regulatory capabilities. Capabilities were identified as integration opportunities if they can support or enhance the actions identified in this plan or be supported or enhanced by components of this plan. The capability assessment identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future:

Capital Improvement Projects—Capital improvement project proposals may take into consideration hazard mitigation potential as a means of evaluating project prioritization.

Post-Disaster Recovery Plan—The District does not have a recovery plan and intends to develop one as a mitigation planning action during the next five years. The plan will build on the mitigation goals and objectives identified in the mitigation plan.

Taking action to integrate each of these programs with the hazard mitigation plan was considered as a mitigation action to include in the action plan in this annex. 916
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 14-8

14.6 RISK ASSESSMENT

14.6.1 Jurisdiction-Specific Natural Hazard Event History Table 14-9 lists past occurrences of natural hazards for which specific damage was recorded in this jurisdiction Other hazard events that broadly affected the entire planning area, including this jurisdiction, are listed in the risk assessments in Volume 1 of this hazard mitigation plan.

Table 14-9.Past Natural Hazard Events
Type of Event FEMA Disaster # Date Damage Assessment
California COVID-19 4482 2020 Ongoing
Thomas Fire FM-5224 2017 $692,821
Severe Storms, Flooding, Debris Flows, and MudslidesDR-1577 2005 $454,822 Severe Winter Storms and Flooding DR-1203 1998 $200,493 Severe Winter Storms, Flooding, Landslides, Mud FlowsDR-1044 1995 $298,414 Grass, Wildlands, Forest Fires DR-739 1985 $43,230
Coastal Storms, Floods, Slides, Tornadoes DR-677 1983 $211,950 Severe Storms, Mudslides, Flooding DR-615 1980 $186,619 Coastal Storms, Mudslides, Flooding DR-547 1978 $1,078,867 Severe Storms, High Tides, Flooding DR-364 1973 $97,341 Severe Storms, Flooding DR-253 1969 $245,005

14.6.2 Hazard Risk Ranking
Table 14-10 presents a local ranking of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property, and district operations. Mitigation actions primarily target hazards with high and medium rankings.

Table 14-10.Hazard Risk Ranking
Rank Hazard Risk RankingScore Risk Category
1 Landslide 39 High
2 Severe Storms 35 High
3 Earthquake 32 High
4 Drought 30 High
4 Severe Weather 30 High
6 Wildfire 24 Medium
7 Flooding 18 Medium
8 Dam Failure 12 Low
9 Sea Level Rise 8 Low
10 Tsunami 7 Low
To develop the Risk Ranking Score for Casitas, first the scores for each category for City of Ojai, City of Ventura, and Unincorporated Ventura County were averaged. Next, for categories for which Casitas has specific experience and damages, the scores were adjusted to be more representative for Casitas’ 917

14. Casitas Municipal Water District
14-9
service area and facilities. This specifically applies to the scores for Dam Failure, Drought, Severe Storms, and Severe Weather for the following reasons:

Dam Failure—The average score was 16 and was adjusted to 12. Casitas Dam is owned by the US Bureau of Reclamation. The original dam was constructed in 1959 and a seismic stability berm was constructed in 1998. The dam is monitored regularly and has an extremely low chance of failure.

Drought—The average score was 9 and was adjusted to 30. Casitas is particularly vulnerable to drought as all water sources are local and dependent on weather. As of October 25, 2021, Lake Casitas is at 33% capacity. If no inflows are received, this represents approximately five years of supply for customer demands. Casitas is currently in Stage 3 of its Water Efficiency Allocation Program and will reevaluate this stage after the 2021/22 winter season. In the event lake capacity is reduced to 30% or less, Casitas would implement Stage 4 of the Water Efficiency Allocation Program.

Severe Storms—The average score was 24 and was adjusted to 35. Due to the topography and geographic location of District facilities, specifically pipelines in canyons and the Robles Diversion Facility adjacent to the Ventura River, damage from severe storms has been significant.

Severe Weather—The average score was 24 and was adjusted to 30. Severe rain causes erosion and landslides where District pipelines are located. Severe hot weather increases evaporation at Lake Casitas as well as customer water demands.

14.6.3 Other Noted Vulnerabilities
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. The following jurisdiction-specific issues have been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources:

Over the past 60 years, the Rincon 2(M) Main, an 18-inch pipeline through mountainous terrain serving the coastal communities, has been washed out by severe storms/landslides, requiring multiple replacement and relocation projects.

The District’s Marion Walker Pressure Filtration Plant, Administration Building/Operations Center and 19 water storage tanks are in need of seismic assessment and potential retrofits.

Lake Casitas relies on local water sources and is at 33% capacity as of October 2021. The ongoing drought has strained both surface water diversions and groundwater supplies.

The Robles Diversion Facility has required several rehabilitation projects due to severe flooding along the Ventura River in 1969, 1973, 1978, 1980, 1995, and 1998 and was damaged in the Thomas Fire.

The Thomas Fire impacted multiple District facilities resulting in a nearly $700,000 FEMA claim.

Rented mobile generators were used to power pump plants when electrical lines burned.

The Marion Walker Pressure Filtration Plant, located at the base of Casitas Dam, is at risk of flooding from Coyote Creek, which would impact potable water treatment to all 65,000 District customers.

Mitigation actions addressing these issues were prioritized for consideration in the action plan in this annex.
918
Ventura County Multi-Jurisdictional Hazard Mitigation Plan 14-10

14.7 STATUS OF PREVIOUS PLAN ACTIONS
Table 14-11 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared.

Table 14-11.Status of Previous Plan Actions
Removed;
CarriedOver to Plan
Update
Action Item from Previous Plan Completed
No Longer
Feasible
Check if
Yes
Action #in
Update
CMWD-3—Replace and relocate pipes in vulnerable areas. CAS-1 Comment:Rincon Main at Ayers Creek relocated in 2020. Additional vulnerable pipelines remain.

CMWD-4—Seismic retrofit of Ojai East and Rincon Control Reservoirs. CAS-4 Comment:Incomplete pending completion of Casitas Master Plan.

14.8 HAZARD MITIGATION ACTION PLAN
Table 14-12 lists the actions that make up the hazard mitigation action plan for this jurisdiction.

Table 14-13 identifies the priority for each action. Table 14-14 summarizes the mitigation actions by hazard of concern and mitigation type.

Table 14-12.Hazard Mitigation Action Plan Matrix
BenefitsNew or
Existing Assets
Objectives
Met Lead Agency
Support
Agency
Estimated
Cost Sources of Funding Timelinea
Action CAS-1—Replace and relocate pipes in vulnerable areas.(previously CMWD-3) Hazards Mitigated:Landslide, Severe Storms, Severe Weather Existing 9,10, 11 Casitas Municipal
Water District
NA High Grant Funding-FEMA HMA (BRIC,
FMA, HMGP), General Funds
Short-term
Action CAS-2—Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.

Hazards Mitigated:Landslide, Severe Storms, Earthquake, Drought, Severe Weather, Wildfire, Flooding, Dam Failure, Sea Level Rise, Tsunami
New & Existing2, 7, 8, 11, 18,
19 County of VenturaCasitas
Municipal
Water
District
Low Staff Time, General FundsShort-term
Action CAS-3—Purchase generators for critical facilities and infrastructure that lack adequate backup power, including Administration Building/Operations Center and pump plants
Hazards Mitigated:Earthquake, Severe Weather, Wildfire
Existing 2, 6 Casitas Municipal
Water District
NA Medium Grant Funding- FEMA HMA (BRIC,
FMA, HMGP), General Funds
Short-term
Action CAS-4—Seismic evaluation and potential retrofitof Marion Walker Pressure Filtration Plant, Administration Building/Operations Center, District reservoirs (previously CMWD-4 Seismic Retrofit of Ojai East and Rincon Control Reservoirs) Hazards Mitigated:Earthquake
Existing 2, 6, 9, 18 Casitas Municipal
Water District
NA High Grant Funding-FEMA HMA (BRIC,
FMA, HMGP), General Funds
Short-term
919

← All documents from this meeting