CITY OF SIMI VALLEY

MEMORANDUM
Augus
t 4, 2025
TO: B
oard of Directors, Ventura County Waterworks District No. 8 FR
OM: Department of Public Works
SUBJ
ECT: AWARD OF CONTRACT FOR PROFESSIONAL DESIGN SERVICES FOR THE STOW TANK NO. 1 REPLACEMENT PROJECT, CP76300057, RFP NO. PW 25-01

STAFF RECOMMENDATION
It
is recommended that the Board of Directors award a contract (page 4 ) to Kennedy Jenks Consultants, Inc. (Kennedy Jenks) in the amount of $477,689 to provide professional design services for the Stow Tank No. 1 Replacement Project (Project), CP76300057, RFP No. PW 25-01.

BACKGROUND AND OVERVIEW
The des
ign is intended to replace Stow Tank No. 1 (Tank) , which has been in service since 1960. The Tank is a welded steel structure approximately 75 feet in diameter and 32 feet high, with a capacity of 1.0 million gallons . The Seismic Evaluation of the Waterworks Storage Tank System, conducted by Kennedy Jenks Consultants in 2020, identified seismic deficiencies for the Tank and provided recommendations for replacement. The District is planning to replace the existing Tank with a new welded-steel Tank that meets the current seismic code requirements to ensure t he reliability of the system. The Tank is located at 5688 Iroquois Court, Simi Valley, CA 93063 (see Location Map, Attachment A, page 105).

Sta
ff considers tank age, existing condition, site seismicity, tank capacity, tank overturning ratio, sliding, settlement, etc. , when prioritizing tanks for repair /rehabilitation or replacement. Where seismic rehabilitation of a tank is required to mitigate existing deficiencies, it may be that replacement with a new tank is a more cost-effective solution.

Based on the cost analysis and recommendations included in the 202 0 Seismic Evaluation Report, i t was determined that tank replacement is a more cost -effective solution to address current seismic deficiencies at Stow Tank No. 1.

FINDINGS AND ALTERNATIVES
On M
arch 20, 2025, a Request for Proposals was posted to the City’s website, and on June 2, 2025, three (3) proposals were received from Lee + Ro, Inc., Cannon Corporation, and Kennedy Jenks. A panel of three staff members evaluated the proposals based on the following five criteria:

AGENDA I

TEM NO.

Consent (7)

• Approach to completing project and schedule (35%)
• Demonstrated professional skill and credentials of staff (20%) • Related experience in water storage tank design (20%) • Understanding the scope of work (15%)
• Cost of Proposal (10%)

The results of the proposal evaluation are summarized below:

CONSULTANT RATING
Kennedy Jenks Consultants, Inc., Oxnard, CA 93%
Lee + Ro, Inc., City of Industry, CA 91%
Cannon Corporation, San Luis Obispo, CA 90%

Staff determined that Kennedy Jenks is the most qualified consultant based on the five evaluation criteria listed above. Kennedy Jenks received the highest score from the panel and was found to have a superior understanding of the project scope of work and the requirements for preparing the design documents for the project. They will also commit qualified staff with expertise and experience, who hav e successfully designed and provided construction support for similar projects. Kennedy Jenks has previously worked with the District on multiple projects and has in-depth knowledge and familiarity with the District’s water storage tanks, having previously prepared the 2020 Seismic Evaluation of the Waterworks Storage Tank System Report.

The FY 2025- 26 Waterworks Budget contains $1,425,000 available for the Stow Tank No. 1 Replacement Project ( CP76300057) therefore, s ufficient funds are available to cover the contract amount.

The design phase is anticipated to be completed by May 2026.

The following alternatives are available to the Board of Directors:

1. Award a contract to Kennedy Jenks in the amount of $477,689 to provide professional design services for the Stow Tank No. 1 R eplacement Project, CP76300057, RFP No. PW 25-01;

2. Do not award a contract at this time and provide direction to staff.

Staff recommends Alternative No. 1.

SUGGESTED BOARD MOTION

I move to award a contract to Kennedy Jenks in the amount of $477,689 to provide professional design services for the Stow Tank No. 1 Replacement Project, CP76300057, RFP No. PW 25-01.

2 for

SUMMARY

On March 20, 2025, a Request for Proposals was posted to the City’s website to provide professional design services for the Stow Tank No. 1 Replacement Project, including plans, specifications, a construction cost estimate, and bid phase support. Three proposals were received, and staff determined that Kennedy Jenks is the most qualified consultant. Staff recommends that the Board of Directors award the contract to Kennedy Jenks in the amount of $477,689.

____________________________________
Ronald K. Fuchiwaki
Public Works Director

Prepared by: Michel Kadah, Principal Engineer

INDEX Page

Contract ............................................................................................ 4 Attachment A – Location Map ...................................................... 105

3

Page 1 of 14 ends

AGREEMENT NO. 3260002

PROFESSIONAL SERVICES AGREEMENT

FOR DESIGN SERVICES

BETWEEN

THE CITY OF SIMI VALLEY AND
KENNEDY JENKS CONSULTANTS, INC.

FOR THE STOW TANK NO. 1 REPLACEMENT PROJECT

THIS AGREEMENT is entered into this 4 th day of August 2025, by and between the CITY OF SIMI VALLEY, a municipal corporation and general law city (“CITY”) and KENNEDY JENKS CONSULTANTS, INC., a California Corporation (“CONSULTANT”).

1. CONSIDERATION.

A. As partial consideration, CONSULTANT agrees to perform the work listed in the SCOPE OF SERVICES, below;

B. As additional consideration, CONSULTANT and CITY agree to abide by the terms and conditions contained in this Agreement;

C. As additional consideration, CITY agrees to pay CONSULTANT a sum not to exceed $477,689.00 for CONSULTANT’s services. CITY may modify this amount as set forth below. Unless otherwise specified by written amendment to this Agreement, CITY will pay this sum as specified in the attached Exhibit “B,” which is incorporated by reference.

2. SCOPE OF SERVICES.

A. CONSULTANT will perform general engineering services listed in the attached Exhibit “A” which is incorporated by reference.

B. The specific services required of CONSULTANT under this Agreement will consist of the tasks and obligations defined in a Task Order approved by CITY and CONSULTANT, in response to specific project scopes of work and services requested by CITY. Any duly executed and approved Task Order will become a part of this Agreement. The standard form for the Task Order is set forth in Exhibit “A”.

C. Consulting services required by CITY will be provided on an as -needed basis with CITY determining and advising CONSULTANT as to when specific services are required to be performed or completed by CONSULTANT.

4 City of Simi Valley
Agreement No. 3260002
Kennedy Jenks Consultants, Inc.

Page 2 of 14 ends

WATER2510.CON.MG RFP No. PW 25-01
D. CONSULTANT will, in a professional manner, furnish all of the labor, technical, administrative, professional and other personnel, all supplies and materials, equipment, printing, vehicles, transportation, office space and facilities, and all tests, testing and analyses, calculation, and all other means whatsoever, except as herein otherwise expressly specified to be furnished by CITY, necessary or proper to perform and complete the work and provide the professional services required of CONSULTANT by this Agreement.

E. CONSULTANT’s duties and services under this agreement may not include preparing or assisting CITY with any portion of CITY’s preparation of a request for proposals, request for qualifications, or any other solicitation regarding a subsequent or additional contract with CITY . CITY retains responsibility for public contracting, including with respect to any subsequent phase of a project. CONSULTANT's participation in the planning, discussions, or drawing of project plans or specifications are limited to conce ptual, preliminary, or initial plans or specifications.

CONSULTANT must cooperate with CITY to ensure that all bidders for a subsequent contract on any subsequent phase of this project have access to the same information, including all conceptual, preliminary, or initial plans or specifications prepared by contractor pursuant to this agreement.

3. PERFORMANCE STANDARDS. While performing this Agreement, CONSULTANT will use the appropriate generally accepted professional standards of practice existing at the time of performance utilized by persons engaged in providing similar services. CITY will continuously monitor CONSULTANT’s services. CITY will notify CONSULTANT of any deficiencies and CONSULTANT will have 15 days after such notification to cure any shortcomings to CITY’s satisfaction. Costs associated with curing the deficiencies will be borne by CONSULTANT.

4. PAYMENTS. CITY will pay CONSULTANT in accordance with the schedule of fees in Exhibit “ B”. For CITY to pay CONSULTANT as specified by this Agreement, CONSULTANT must submit a detailed invoice to CITY which lists the hours worked and hourly rates for each personnel category and reimbursable costs (all as set forth in Exhibit “B”) the tasks performed, the percentage of the task completed during the billing period, the cumulative percentage completed for each task, the total cost of that work during the preceding billing month and a cumulative cash flow curve showing projected and actual expenditures versus time to date.

5. NON-APPROPRIATION OF FUNDS. Payments due and payable to CONSULTANT for current services are within the current budget and within an available, unexhausted and unencumbered appropriation of the CITY. In the event the CITY has not appropriated sufficient funds for payment of CONSULTANT services beyond the current fiscal year, this Agreement will cover only those costs incurred up to the conclusion of the current fiscal year.

5 City of Simi Valley
Agreement No. 3260002
Kennedy Jenks Consultants, Inc.

Page 3 of 14 ends

WATER2510.CON.MG RFP No. PW 25-01

6. ADDITIONAL WORK.

A. CITY’s City Manager (“Manager”) may determine, at the Manager’s sole discretion, that CONSULTANT must perform additional work (“Additional Work”) to complete the Scope of Work. If Additional Work is needed, the Manager will give written authorization to CONSULTANT to perform such Additional Work.

B. If CONSULTANT believes Additional Work is needed to complete the Scope of Work, CONSULTANT will provide the Manager with written notification that contains a specific description of the proposed Additional Work, reasons for such Additional Work, and a detailed proposal regarding cost.

C. Payments over $477,689.00 for Additional Work must be approved by CITY’s City Council, Manager, or Department Head as provided in title 2, chapter 9 of CITY’s municipal code. All Additional Work will be subject to all other terms and provisions of this Agreement.

7. FAMILIARITY WITH WORK.

A. By executing this Agreement, CONSULTANT agrees that it has:

i. Carefully investigated and considered the scope of services to be performed;

ii. Carefully considered how the services should be performed; and

iii. Understands the facilities, difficulties, and restrictions attending performance of the services under this Agreement.

B. If services involve work upon any site, CONSULTANT agrees that CONSULTANT has or will investigate the site and is or will be fully acquainted with the conditions there existing, before commencing the services hereunder. Should CONSULTANT discover any latent or unknown conditions that may materially affect the performance of the services, CONSULTANT will immediately inform CITY of such fact and will not proceed except at CONSULTANT’s own risk until written instructions are received from CITY.

8. TERM. The term of this Agreement will be from August 4, 2025 to December 31, 2028. Unless otherwise determined by written amendment between the parties, this Agreement will terminate in the following instances:

A. Completion of the work specified in Exhibit “A”.

B. Termination as stated in Section 16.
6 City of Simi Valley
Agreement No. 3260002
Kennedy Jenks Consultants, Inc.

Page 4 of 14 ends

WATER2510.CON.MG RFP No. PW 25-01

9. TIME FOR PERFORMANCE.

A. CONSULTANT will not perform any work under this Agreement until:

i. CONSULTANT furnishes proof of insurance as required under Section 23 of this Agreement; and

ii. CITY gives CONSULTANT a written notice to proceed.

B. Should CONSULTANT begin work on any phase in advance of receiving written authorization to proceed, any such professional services are at CONSULTANT’s own risk.

10. TIME EXTENSIONS . Should CONSULTANT be delayed by causes beyond CONSULTANT’s control, CITY may grant a time extension for the completion of the contracted services. If delay occurs, CONSULTANT must notify the Manager within forty- eight hours (48 hours), in writing, of the cause and the extent of the delay and how such delay interferes with the Agreement’s schedule. The Manager will extend the completion time, when appropriate, for the completion of the contracted services.

11. CONSISTENCY. In interpreting this Agreement and resolving any ambiguities, the main body of this Agreement takes precedence over the attached Exhibits; this Agreement supersedes any conflicting provisions. Any inconsistency between the Exhibits will be resolved in the order in which the Exhibits appear below:

Exhibit “A” – Scope of Services
Exhibit “B” – Schedule of Fees

12. CHANGES. CITY may order changes in the services within the general scope of this Agreement, consisting of additions, deletions, or other revisions, and the contract sum and the contract time will be adjusted accordingly. All such changes must be authorized in writing, executed by CONSULTANT and CITY. The cost or credit to CITY resulting from changes in the services will be determined in accordance with written agreement between the parties.

13. TAXPAYER IDENTIFICATION NUMBER. CONSULTANT will provide CITY with a Taxpayer Identification Number.

14. PERMITS AND LICENSES . CONSULTANT, at its sole expense, will obtain and maintain during the term of this Agreement, all necessary permits, licenses, and certificates that may be required in connection with the performance of services under this Agreement.

7 City of Simi Valley
Agreement No. 3260002
Kennedy Jenks Consultants, Inc.

Page 5 of 14 ends

WATER2510.CON.MG RFP No. PW 25-01

15. WAIVER. CITY’s review or acceptance of, or payment for, work product prepared by CONSULTANT under this Agreement will not be construed to operate as a waiver of any rights CITY may have under this Agreement or of any cause of action arising from CONSULTANT’s performance. A waiver by CITY of any breach of any term, covenant, or condition contained in this Agreement will not be deemed to be a waiver of any subsequent breach of the same or any other term, covenant, or condition contained in this Agreement, whether of the same or different character.

16. TERMINATION.

A. Except as otherwise provided, CITY may terminate this Agreement at any time with or without cause.

B. CONSULTANT may terminate this Agreement at any time with CITY’s mutual consent. Notice will be in writing at least thirty (30) days before the effective termination date.

C. Upon receiving a termination notice, CONSULTANT will immediately cease performance under this Agreement unless otherwise provided in the termination notice. Except as otherwise provided in the termination notice, any additional work performed by CONSULTANT after receiving a termination notice will be performed at CONSULTANT'’ own cost; CITY will not be obligated to compensate CONSULTANT for such work.

D. Should termination occur, all finished or unfinished documents, data, studies, surveys, drawings, maps, reports and other materials prepared by CONSULTANT will, at CITY’s option, become CITY’s property, and CONSULTANT will receive just and equitable compensation for any work satisfactorily completed up to the effective date of notice of termination, not to exceed the total costs under Section 1(C).

E. Should the Agreement be terminated pursuant to this Section, CITY may procure on its own terms services similar to those terminated.

F. By executing this document, CONSULTANT waives any and all claims for damages that might otherwise arise from CITY’s termination under this Section.

17. OWNERSHIP OF DOCUMENTS; EXCEPTIONS; WARRANTY. Except as otherwise provided below, all documents, data, studies, drawings, maps, models, photographs and reports prepared by CONSULTANT (collectively, “Documents”) under this Agreement are CITY’s property. CONSULTANT may retain copies of such Documents as desired but will deliver all original materials to CITY upon CITY’s written notice. CITY agrees that use of CONSULTANT’s completed work product, for purposes other than identified in this Agreement, or use of incomplete work product, is at CITY’s own risk. CONSULTANT 8 City of Simi Valley
Agreement No. 3260002
Kennedy Jenks Consultants, Inc.

Page 6 of 14 ends

WATER2510.CON.MG RFP No. PW 25-01
warrants that all Documents it drafts and completes pursuant to this Agreement constitutes original work. Specifically, CONSULTANT understands and agrees that use of artificial intelligence (AI) tools including, without limitation, ChatGPT, Microsoft’s Bing Chat, Google’s Bard, and Meta’s LLaMA (Large Language Model Meta AI), in the performance of this Agreement does not constitute an original work, i.e., submitting Documents generated by such AI tools to CITY and representing it as CONSULTANT’s original work constitutes a material breach of this Agreement, constitutes a false claim, and may also violate applicable intellectual property right laws including, without limitation, United States Copyright Law. Accordingly, and notwithstanding any other provision of this Agreement as to ownership, CITY specifically rejects ownership of such Documents. CONSULTANT is required to indemnify and defend CITY to the fullest extent allowed by applicable law should it violate this Section.

18. PUBLICATION OF DOCUMENTS. Except as necessary for performance of service under this Agreement, no copies, sketches, or graphs of materials, including graphic art work, prepared pursuant to this Agreement, will be released by CONSULTANT to any other person or public CITY without CITY’s prior written approval. All press releases, including graphic display information to be published in newspapers or magazines, will be approved and distributed solely by CITY, unless otherwise provided by written agreement between the parties.

19. INDEMNIFICATION.

A. CONSULTANT must save harmless, indemnify and defend CITY and all its officers, employees and representatives from and against any and all suits, actions, or claims, of any character whatever, brought for, or on account of, any injuries or damages sustained by any person or property arising from, pertaining to, or relating to the negligence, recklessness, or willful misconduct of CONSULTANT or any of CONSULTANT’s officers, agents, employees, or representatives.

B. For purposes of this section “CITY” includes CITY’s officers, officials, employees, agents, representatives, and certified volunteers.

C. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California and will survive termination of this Agreement.

D. The requirements as to the types and limits of insurance coverage to be maintained by CONSULTANT as required by Section 23, and any approval of said insurance by CITY, are not intended to and will not in any manner limit or qualify the liabilities and obligations otherwise assumed by CONSULTANT pursuant to this Agreement, including, without limitation, to the provisions concerning indemnification.

9 City of Simi Valley
Agreement No. 3260002
Kennedy Jenks Consultants, Inc.

Page 7 of 14 ends

WATER2510.CON.MG RFP No. PW 25-01

20. ASSIGNABILITY. This Agreement is for CONSULTANT’s professional services.

CONSULTANT’s attempts to assign the benefits or burdens of this Agreement without CITY’s written approval are prohibited and will be null and void.

21. INDEPENDENT CONTRACTOR. CITY and CONSULTANT agree that CONSULTANT will act as an independent contractor and will have control of all work and the manner in which is it performed. CONSULTANT will be free to contract for similar service to be performed for other employers while under contract with CITY.

CONSULTANT is not an agent or employee of CITY and is not entitled to participate in any pension plan, insurance, bonus or similar benefits CITY provides for its employees.

Any provision in this Agreement that may appear to give CITY the right to direct CONSULTANT as to the details of doing the work or to exercise a measure of control over the work means that CONSULTANT will follow the direction of the CITY as to end results of the work only.

22. AUDIT OF RECORDS. CONSULTANT will maintain full and accurate records with respect to all services and matters covered under this Agreement. CITY will have free access at all reasonable times to such records, and the right to examine and audit the same and to make transcript therefrom, and to inspect all program data, documents, proceedings and activities. CONSULTANT will retain such financial and program service records for at least three (3) years after termination or final payment under this Agreement.

23. INSURANCE.

A. Before commencing performance under this Agreement, and at all other times this Agreement is effective, CONSULTANT will procure and maintain the following types of insurance with coverage limits complying, at a minimum, with the limits set forth below:

Type of Insurance Limits

C ommercial general liability: $2,000,000

Professional Liability $1,000,000

Business automobile liability $1,000,000

Workers compensation Statutory requirement

B. Commercial general liability insurance will meet or exceed the requirements of the most recent ISO -CGL Form s. The amount of insurance set forth above will be a combined single limit per occurrence for bodily injury, personal injury, and property damage for the policy coverage. Liability policies will be endorsed to name CITY, its officials, and employees as 10 City of Simi Valley
Agreement No. 3260002
Kennedy Jenks Consultants, Inc.

Page 8 of 14 ends

WATER2510.CON.MG RFP No. PW 25-01
“additional insureds” under said insurance coverage and to state that such insurance will be deemed “primary” such that any other insurance that may be carried by CITY will be excess thereto. Such insurance will be on an “occurrence,” not a “claims made,” basis and will not be cancelable or subject to reduction except upon thirty (30) days prior written notice to CITY.

C. Professional liability coverage will be on an “occurrence basis” if such coverage is available, or on a “claims made” basis if not available. When coverage is provided on a “claims made basis,” CONSULTANT will continue to renew the insurance for a period of three (3) years after this Agreement expires or is terminated. Such insurance will have the same coverage and limits as the policy that was in effect during the term of this Agreement, and will cover CONSULTANT for all claims made by CITY arising out of any errors or omissions of CONSULTANT, or its officers, employees or agents during the time this Agreement was in effect.

D. Automobile coverage will be written on ISO Business Auto Coverage Form CA 00 01 06 92, including symbol 1 (Any Auto).

E. CONSULTANT will furnish to CITY duly authenticated Certificates of Insurance evidencing maintenance of the insurance required under this Agreement and such other evidence of insurance or copies of policies as may be reasonably required by CITY from time to time. Insurance must be placed with insurers with a current A.M. Best Company Rating equivalent to at least a Rating of “A:VII.”

F. Should CONSULTANT, for any reason, fail to obtain and maintain the insurance required by this Agreement, CITY may obtain such coverage at CONSULTANT’s expense and deduct the cost of such insurance from payments due to CONSULTANT under this Agreement or ter minate pursuant to Section 16.

G. Self-Insured Retention/Deductibles. All policies required by this Agreement must allow CITY, as additional insured, to satisfy the self -insured retention (“SIR”) and deductible of the policy in lieu of CONSULTANT (as the named insured) should CONSULTANT fail to pay the SIR or deductible requirements. The amount of the SIR or deductible is subject to the approval of the City Attorney and the Risk Manager. CONSULTANT understands and agrees that satisfaction of this requirement is an express condition precedent to the effectiveness of this Agreement. Failure by CONSULTANT as primary insured to pay its SIR or deductible constitutes a material breach of this Agreement. Should CITY pay the SIR or deductible on CITY’s behalf upon the CONSULTANT’S failure or refusal to do so in order to secure defense and indemnification as an additional insured under the policy, CITY may include such amounts as damages in any action against 11 City of Simi Valley
Agreement No. 3260002
Kennedy Jenks Consultants, Inc.

Page 9 of 14 ends

WATER2510.CON.MG RFP No. PW 25-01
CONSULTANT for breach of this Agreement in addition to any other damages incurred by CITY due to the breach.

24. USE OF SUBCONTRACTORS . CONSULTANT must obtain CITY’s prior written approval to use any consultants while performing any portion of this Agreement. Such approval must approve of the proposed consultant and the terms of compensation.

25. INCIDENTAL TASKS. CONSULTANT will meet with CITY monthly to provide the status on the project, which will include a schedule update and a short narrative description of progress during the past month for each major task, a description of the work remaining and a description of the work to be done before the next schedule update.

26. NOTICES. All communications to either party by the other party will be deemed made when received by such party at its respective name and address as follows:

If to CONSULTANT:

If to CITY:

Attention: Jeff Savard Attention: Michel Kadah
Kennedy Jenks Consultants, Inc. City of Simi Valley
2775 North Ventura Road, Suite 202 2929 Tapo Canyon Road Oxnard, CA 93036 Simi Valley, CA 93063
(805) 973-5719 (805) 583-6893
[email protected] [email protected]

Any such written communications by mail will be conclusively deemed to have been received by the addressee upon deposit thereof in the United States Mail, postage prepaid and properly addressed as noted above. In all other instances, notices will be deemed given at the time of actual delivery. Changes may be made in the names or addresses of persons to whom notices are to be given by giving notice in the manner prescribed in this paragraph.

27. CONFLICT OF INTEREST . CONSULTANT will comply with all conflict of interest laws and regulations including, without limitation, CITY’s conflict of interest regulations.

28. SOLICITATION. CONSULTANT maintains and warrants that it has not employed nor retained any company or person, other than CONSULTANT’s bona fide employee, to solicit or secure this Agreement. Further, CONSULTANT warrants that it has not paid nor has it agreed to pay any company or person, other than CONSULTANT’s bona fide employee, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. Should CONSULTANT breach or violate this warranty, CITY may rescind this Agreement without liability.

29. THIRD PARTY BENEFICIARIES . This Agreement and every provision herein is generally for the exclusive benefit of CONSULTANT and CITY and not for the benefit of 12 City of Simi Valley
Agreement No. 3260002
Kennedy Jenks Consultants, Inc.

Page 10 of 14 ends

WATER2510.CON.MG RFP No. PW 25-01
any other party. There will be no incidental or other beneficiaries of any of CONSULTANT’s or CITY’s obligations under this Agreement.

30. INTERPRETATION. This Agreement was drafted in, and will be construed in accordance with the laws of the State of California, and exclusive venue for any action involving this agreement will be in Ventura County.

31. COMPLIANCE WITH LAW. CONSULTANT agrees to comply with all federal, state, and local laws applicable to this Agreement.

32. ENTIRE AGREEMENT. This Agreement, and its Attachments, sets forth the entire understanding of the parties. There are no other understandings, terms or other agreements expressed or implied, oral or written. There are 2 Attachments to this Agreement. This Agreement will bind and inure to the benefit of the parties to this Agreement and any subsequent successors and assigns.

33. RULES OF CONSTRUCTION. Each Party had the opportunity to independently review this Agreement with legal counsel. Accordingly, this Agreement will be construed simply, as a whole, and in accordance with its fair meaning; it will not be interpreted strictly for or against either Party.

34. SEVERABILITY. If any portion of this Agreement is declared by a court of competent jurisdiction to be invalid or unenforceable, then such portion will be deemed modified to the extent necessary in the opinion of the court to render such portion enforceable and, as so modified, such portion and the balance of this Agreement will continue in full force and effect.

35. AUTHORITY/MODIFICATION. The Parties represent and warrant that all necessary action has been taken by the Parties to authorize the undersigned to execute this Agreement and to engage in the actions described herein. This Agreement may be modified by written amendment. CITY’s Manager, or designee, may execute any such amendment on behalf of CITY.

36. ELECTRONIC SIGNATURES. This Agreement may be executed by the Parties on any number of separate counterparts, and all such counterparts so executed constitute one Agreement binding on all the Parties notwithstanding that all the Parties are not signatories to the same counterpart. In accordance with Government Code §16.5, the Parties agree that this Agreement, Agreements ancillary to this Agreement, and related documents to be entered into in connection with this Agreement will be considered signed when the signature of a party is delivered by electronic transmission. Such electronic signature will be treated in all respects as having the same effect as an original signature.

37. CAPTIONS. The captions of the paragraphs of this Agreement are for convenience of reference only and will not affect the interpretation of this Agreement.

13 City of Simi Valley
Agreement No. 3260002
Kennedy Jenks Consultants, Inc.

Page 11 of 14 ends

WATER2510.CON.MG RFP No. PW 25-01

38. TIME IS OF ESSENCE. Time is of the essence for each and every provision of this Agreement.

39. FORCE MAJEURE. Should performance of this Agreement be prevented due to fire, flood, explosion, acts of terrorism, war, embargo, government action, civil or military authority, the natural elements, or other similar causes beyond the Parties’ reasonable control, then the Agreement will immediately terminate without obligation of either party to the other.

40. STATEMENT OF EXPERIENCE. By executing this Agreement, CONSULTANT represents that it has demonstrated trustworthiness and possesses the quality, fitness and capacity to perform the Agreement in a manner satisfactory to CITY. CONSULTANT represents that its financial resources, surety and insurance experience, service experience, completion ability, personnel, current workload, experience in dealing with private consultants, and experience in dealing with public agencies all suggest that CONSULTANT is capable of performing the proposed contract and has a demonstrated capacity to deal fairly and effectively with and to satisfy a public CITY.

[SIGNATURES ON NEXT PAGE]

14 City of Simi Valley
Agreement No. 3260002
Kennedy Jenks Consultants, Inc.

Page 12 of 14 ends

WATER2510.CON.MG RFP No. PW 25-01
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the day and year first hereinabove written.

Attest: City of Simi Valley, A Municipal Corporation

By:

Lucy Blanco, City Clerk Dee Dee Cavanaugh, Mayor of the City of Simi Valley, California

Approved as to Form:

Kennedy Jenks Consultants, Inc.

By:

Algeria R. Ford, City Attorney
Print Name: Jeff Savard

Approved as to Content: Title: Vice President

By:

Samantha C. Argabrite, City Manager
Print Name: Edward Young

Title: Vice President
Johanna Medrano,
Deputy Administrative Services Director/
Budget & Purchasing

Ronald K. Fuchiwaki,
Public Works Director

15 City of Simi Valley
Agreement No. 3260002
Kennedy Jenks Consultants, Inc.

Page 13 of 14 ends

WATER2510.CON.MG RFP No. PW 25-01

EXHIBIT “A”

SCOPE OF SERVICES

16 City of Simi Valley/Ventura County Waterworks
District No. 8
Stow Tank No. 1 Replacement -
CP76300057
RFP No. PW 25-01 Part 1 - Technical | June 2, 2025
17 Table of Contents
Request for Proposal Acknowledgment Form
Signed Addendums No. 1, No. 2, and No. 3
Cover Letter
Section 1 - Introduction
.......................................................1 Section 2 - Project Analysis .................................................2 Section 3 - Objective, Scope, Nature of
Proposed Program ...............................................................5 Section 4 - Work Program .................................................. 11 Section 5 - Methodology .................................................... 17 Section 6 - Project Management ........................................ 19 Section 7 - Assigned Personnel .......................................... 22 Section 8 - Schedule .......................................................... 29 Section 9 - Program Monitoring .......................................... 30 Section 10 - District Resources .......................................... 31 Section 11 - Subcontractors ............................................... 32 Section 12 - Statement of Proposer's Qualifications
and References ................................................................. 34 Section 13 - Alternative Proposals ...................................... 42 Section 14 - Conflict of Interest .......................................... 43 Appendix A Resumes
18 RFP NO. PW 25-01

SUBMIT WITH PROPOSAL
1 VENTURA COUNTY WATERWORKS DISTRICT NO. 8

CITY OF SIMI VALLEY

REQUEST FOR PROPOSAL ACKNOWLEDGEMENT FORM
PROPOSALS ARE DUE: NO LATER THAN 3:00 P.M. ON MAY 22, 2025.

The District is seeking proposals from qualified engineering firms to provide Professional Services for the Design of Stow Tank No. 1 Replacement, CP76300057, RFP NO. PW 25-01.

1. Submit three original Proposals of the Technical Qualifications and three Proposals for the Cost Proposal in separate envelopes to:

City Clerk/District Secretary’s Office
Ventura County Waterworks District No. 8
2929 Tapo Canyon Road
Simi Valley, CA 93063

2. Proposer must honor proposal prices for 60 days.

3. Proposals must include this Proposal form and be signed by the vendor's authorized representative.

4. Award of a contract, if any, will be made by the Board of Directors based upon the criteria set forth in this R equest for Proposal and will be made based upon the best qualified Proposer rather than lowest price.

PROPOSER TO READ
I have, read, understood, and agree to the terms and conditions on all pages of this Request for Proposal. The undersigned agrees to furnish the commodity or service stipulated on this Proposal as stated above.
____________________________ __________________________________ Name (Print) Company
____________________________ ________________________________ Title of Person Signing Proposal Address
____________________________ ________________________________ Signature Company Phone No.

Jeff Savard, PE Kennedy/Jenks Consultants, Inc.

Vice President, Project Manager
2775 North Ventura Road, Suite 202
Oxnard, CA 93036
(805) 973-5700
19 SUBMIT WITH RFP
Ventura County Waterworks District No. B
City of Simi Valley
March 27, 2025
SUBJECT: REQUEST FOR PROPOSALS TO PROVIDE PROFESSIONAL
SERVICES FOR THE DESIGN OF STOW TANK NO. 1 REPLACEMENT, CP76300057, RFP NO. PW 25-01 ADDENDUM NO. 1
All Prospective Proposers:

NOTICE IS HEREBY GIVEN to all prospective proposers that the following modifications are made to the subject REQUEST FOR PROPOSALS:
• The location of the mandatory pre-proposal meeting on Thursday May 8, 2025, is changed from 2929 Tapo Canyon Road Simi Valley, CA 93063 to an onsite meeting. The mandatory pre-proposal meeting will be held at the tank site located at 5610 Iroquois Court, Simi Valley, California 93063. All Prospective Proposers will meet at the Yosemite Avenue access gate on May 8, 2025, at 10:00 a.m.

Acknowledgment of this addendum by returning the signed addendum along with the Request for Proposal documents to the City is required . Failure to do so may result in the disqualification of your proposal.

Questions regarding this addendum may be directed to Marcos Ferreccio, Associate Engineer, at (805) 583-6804.

Sincerely,
Mt>.TVqJ_,AJ~
Marcos Ferreccio, MS, PE
Associate Engineer

RECEIPT OF THIS NOTICE IS HEREBY ACKNOWLEDGED
Name (Print)
Signature
Title
Addendum No. 1 RFP No. PW 25-01
Jeff Savard, PE
Vice President
20 SUBMIT WITH RFP
CITY OF SIMI VALLEY/ VENTURA COUNTY WATERWORKS DISTRICT NO. 8

REQUEST FOR PROPOSALS TO PROVIDE PROFESSIONAL SERVICES
FOR THE DESIGN OF STOW TANK NO. 1 REPLACEMENT, CP76300057, RFP NO. PW 25-01
ADDENDUM NO. 1
March 27, 2024

REVISED REQUEST FOR PROPOSALS
The following revisions as noted herein:

Affected Section Page Number
Request For Proposals Cover Page .................. ............................. ......... ........ ..... 1 The mandatory pre-proposal meeting will be held at the tank site located at 5610 Iroquois Court, Simi Valley, California 93063. All Prospective Proposers will meet at the Yosemite Avenue access gate on May 8, 2025 at 10:00 a.m.

Addendum No. 1 RFP No. PW 25-01
21 SUBMIT WITH RFP
Ventura County Waterworks District No. 8
City of Simi Valley
March 31, 2025
SUBJECT: REQUEST FOR PROPOSALS TO PROVIDE PROFESSIONAL SERVICES FOR THE DESIGN OF STOW TANK NO. 1 REPLACEMENT, CP76300057, RFP NO. PW 25-01 ADDENDUM NO. 2
All Prospective Proposers:

NOTICE IS HEREBY GIVEN to all prospective proposers that the following modifications are made to the subject REQUEST FOR PROPOSALS:
• The design of the water storage tank must be in compliance with the Ventura County Waterworks District No. 8, Water Design and Construction Standards (WDCS), adopted by the District Board of Directors on July 26, 2021, and subsequent revisions. The replacement tank shall be designed in accordance with Section 3.5.3 (Tank Requirements and Design) of the woes. The woes is available at the District' website Design and Construction Standards.

Acknowledgment of this addendum by returning the signed addendum along with the Request for Proposal documents to the City is required. Failure to do so may result in the disqualification of your proposal.

Questions regarding this addendum may be directed to Marcos Ferreccio, Associate Engineer, at (805) 583-6804.

Sincerely,
fl\~A~Y~
Marcos Ferreccio, MS, PE
Associate Engineer

RECEIPT OF THIS NOTICE IS HEREBY ACKNOWLEDGED
Name (Print)
Signature
Title
Addendum No. 2 RFP No. PW 25-01
Jeff Savard, PE
Vice President
22 SUBMIT WITH RFP
CITY OF SIMI VALLEY/ VENTURA COUNTY WATERWORKS DISTRICT NO. 8

REQUEST FOR PROPOSALS TO PROVIDE PROFESSIONAL SERVICES
FOR THE DESIGN OF STOW TANK NO.1 REPLACEMENT, CP76300057, RFP NO. PW 25-01
ADDENDUM NO. 2
March 31, 2025

REVISED REQUEST FOR PROPOSALS
The following revisions as noted herein:

Affected Section Page Number
Proposal Information, Section I, (Introduction/Background) ........... ........................ 2 The Seismic Evaluation of the Waterworks Storage Tank System, conducted by Kennedy Jenks Consultants in 2020, identified seismic deficiencies for the Tank and provided recommendations for replacement. The District is planning to replace the existing Tank with a new welded-steel Tank that meets the current seismic code requirements to ensure the reliability of the system. The design of all public water facilities must be in compliance with the Ventura County Waterworks District No. 8, Water Design and Construction Standards (WDCS), adopted by the District Board of Directors on July 26, 2021, and subsequent revisions. The replacement tank shall be designed in accordance with Section

3.5.3 (Tank Requirements and Design) of the WDCS. The Design is anticipated to be completed in May 2026, and construction is expected to be completed in Winter 2028 Proposal Information, Section Ill, (Statement of Work}, C. (Design Services) .......... 3 Prepare all civil, structural, mechanical, electrical, and instrumentation design, including project plans and specifications. The design of all public water facilities must be in compliance with the Ventura County Waterworks District No. 8, Water Design and Construction Standards (WDCS), adopted by the District Board of Directors on July 26, 2021, and subsequent revisions. The replacement tank shall be designed in accordance with Section 3.5.3 (Tank Requirements and Design) of the WDCS. The Design is anticipated to be completed in May 2026, and construction is expected to be completed in Winter 2028.

Addendum No. 2 RFP No. PW 25-01
23 SUBMIT WITH RFP
Ventura County Waterworks District No. B
City of Simi Valley
May 21, 2025
SUBJECT: REQUEST FOR PROPOSALS TO PROVIDE PROFESSIONAL SERVICES FOR THE DESIGN OF STOW TANK NO. 1 REPLACEMENT, CP76300057, RFP NO. PW 25-01
ADDENDUM NO. 3
All Prospective Proposers:

NOTICE IS HEREBY GIVEN to all prospective proposers that the following modifications are made to the subject REQUEST FOR PROPOSALS:
• Proposal submission deadline will be extended from 3:00 P.M . on May 22, 2025 to 3:00 P.M. on June 2, 2025
• Board of Directors Approval will be changed from July 21, 2025 to August 4, 2025 • Award Notification will be changed from July 22, 2025 to August 5, 2025 • Consultant Start Date will be changed from July 22, 2025 to August 5, 2025 Acknowledgment of this addendum by returning the signed addendum along with the Request for Proposal documents to the City is required. Failure to do so may result in the disqualification of your proposal.

Questions regarding this addendum may be directed to Marcos Ferreccio, Associate Engineer, at (805) 583-6804.

Sincerely,
MOJ7dl.A�f� Marcos Ferreccio, MS, PE
Associate Engineer

RECEIPT OF THIS NOTICE IS HEREBY ACKNOWLEDGED
Name (Print)
Signature
Title
Addendum No. 3 RFP No. PW 25-01
Jeff Savard, PE
Vice President
24 SUBMIT WITH RFP
CITY OF SIMI VALLEY/ VENTURA COUNTY WATERWORKS DISTRICT NO. 8

REQUEST FOR PROPOSALS TO PROVIDE PROFESSIONAL SERVICES
FOR THE DESIGN OF STOW TANK NO.1 REPLACEMENT, CP76300057, RFP NO. PW 25-01
ADDENDUM NO. 3
May 21, 2025

REVISED REQUEST FOR PROPOSALS
The following revisions as noted herein:

Affected Sections Page Number
Request For Proposals Cover Page . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . 1 Sealed proposals must be received at or before 3:00 P.M. on June 2, 2025, by the City Clerk/District Secretary's office for the District, 2929 Tapo Canyon Road, Simi Valley CA 93063.

Request For Proposals Cover Page . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . 1 Please mark the outside of the envelope (and express shipment, if applicable):

REQUEST FOR PROPOSALS TO PROVIDE PROFESSIONAL SERVICES FOR THE DESIGN OF STOW TANK NO. 1 REPLACEMENT, CP76300057, RFP NO. PW25-01 3:00 P.M. on June 2, 2025
Request for Proposal Acknowledgement Form . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . .. . . . . . . . . . 1 Proposals Are Due: No Later Than 3:00 P.M. on June 2, 2025 Section VII, Proposal Schedule ......................................................................... 4 RFP Submission Deadline: June 2, 2025
Section VII, Proposal Schedule ......................................................................... 4 Board of Directors Approval: August 4, 2025
Section VII, Proposal Schedule ......................................................................... 4 Award Notification: August 5, 2025
Section VII, Proposal Schedule ......................................................................... 4 Consultant Start Date: August 5, 2025
Proposal Requirements ..................................................................................... 5 Three copies of the Proposal must be received by the City Clerk/District Secretary's Office, 2929 Tape Canyon Road, Simi Valley, CA 93063, at or before 3:00 P.M. on June 2, 2025.

Addendum No. 3 RFP No. PW 25-01
25 SUBMIT WITH RFP
Proposal Submission, Due Date . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 All Proposals must be received on 3:00 P.M. on June 2, 2025, and should be directed to:

City Clerk/District Secretary's Office 2929 Tape Canyon Road Simi Valley, CA 93063 Late bids/proposals will not be accepted. Any correction or resubmission done by the proposer will not extend the submittal due date.

Addendum No. 3 RFP No. PW 25-01
26 2775 North Ventura Road, Suite 202 | Oxnard, CA 93036 | (805) 973-5700 | www.kennedyjenks.com Jeff Savard, PE
Principal-In-Charge/Project Manager
June 2, 2025
Ventura County Waterworks District No. 8
2929 Tapo Canyon Road, Simi Valley, CA 93063
Subject: Proposal for Engineering Services for Stow Tank No. 1 Replacement Project - RFP No. PW 25-01 Dear Mr. Ferreccio:

Kennedy/Jenks Consultants, Inc. (KJ) is pleased to submit our proposal for the engineering services required for the Stow Tank No. 1 Replacement Project. We understand the importance of this project in enhancing the seismic resiliency and reliability of your water distribution system. Our team is excited about the opportunity to work with Ventura County Waterworks District No. 8 to deliver a successful project that meets your needs and expectations.

Familiar Team and Leadership:

Led by our project manager, Jeff Savard, our project team has the local experience to accomplish your goals and objectives for this project. Jeff has been involved with over 20 tank/reservoir projects in Ventura County, including two for the District. KJ successfully completed the design of the aerator tank replacement project for the District at your Tapo Canyon Water Treatment Plant and recently completed the seismic evaluation of all the District’s water storage tanks within the potable water system. Jeff also recently supported the District in designing improvements to the Walnut 2 West Tank. KJ has successfully worked with District staff on past projects and understands the performance standards and features expected by the District.

Proven Expertise in Water Storage Solutions:

Our project engineer, Don Barraza, has more than 35 years of civil and structural design experience, has completed over 20 structural condition assessments, and has designed more than 145 tanks and reservoirs. Don served as project manager for the District’s seismic evaluation of all potable water tanks, which included Stow Tank No. 1. Having visited the site and performed the seismic evaluation of Stow Tank No. 1, Don is very familiar with the tank site and the concerns related to the reliability of the existing tank. Don also recently provided on-call structural design assistance for the District on the Box Canyon and East Walnut tank improvement projects.

Dedicated to the District's Success:

Throughout our 105-year history, KJ has provided multi-disciplinary engineering services throughout California and Ventura County for the last 35 years. Our working relationship with the District and the City of Simi Valley goes back to the late 1980s for projects at the wastewater treatment plant and extends to the present with welded steel tank projects. KJ values strong client relationships and has built a reputation for reliability and trustworthiness.

On behalf of the KJ team, we appreciate the opportunity to submit this proposal and look forward to continuing to work with you to deliver another successful project for your community. Our poposal will remain valid for 90 days following the submittal date. Jeff Savard is authorized to represent KJ for correspondence and negotiations. Please contact me at (805) 973-5719 or [email protected], if you should have any questions.

Very truly yours,
Kennedy/Jenks Consultants, Inc.
27 KENNEDY/JENKS CONSUL TANTS, INC.
1 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
1 Introduction
Experience Delivering Similar Projects Increases Efficiency and Decreases Risk KJ is an employee-owned and operated innovative engineering and scientific consulting firm, serving both the public and private utility sectors. We are proud of our 106-year history and have over 500 engineers, scientists, and support staff in 31 offices across the United States.

KJ provides a full range of water distribution and storage planning and design capabilities. Our reservoir design experience includes bolted steel tanks (both coated and glass-fused), welded steel tanks and concrete reservoirs. KJ has successfully completed more than 100 water storage tanks over the past ten years. In the past five years, our engineers have participated in the design of 45 tank projects.

Source
Control/
Pretreatment
Program
Sludge
Lagoon 1 &
2 Cleaning
Project
Site
Investigation
Workplan and
Hazardous
Material Study
Wastewater
Rate Study
Recycled
Water Master
Plan
Wastewater
Collection
System
Rehabilitation
Plan
Urban Water
Management Plan
Recycled Water
Storage Tank
Anaerobic
Digester
System
Preliminary
Design
Report
Aerator Tank
Replacement
Final Design
Engineering
Box
Canyon
Pump
Station
Lower
McCoy Water
Storage Tank
Seismic
Tank System
Evaluation
1988 1990 1992 2000 2003 2005 2007 2015 2016 2017 2020 2021 2022 2023 2024 Walnut 2 West 2.0
MG Tank Rehab
and Recoating
Annual Water
Supply &
Assessment
Report
Annual Water Supply &
Demand Assessment
West Simi Valley Water
Recycling Project
Hazard
Mitigation
Grant Program
Application
Assistance
Lead and
Copper Rule
Revisions
Our recent experience with the District and the City promotes efficient and streamlined approach to your projects.

Why KJ?
• Over 30 years of
experience working with
the City/District
• Completed condition
assessments and seismic
upgrades of over 40
Welded Steel Tanks
• Completed 135+ Welded
steel water storage tank
designs, including two
tank projects for the
District
• Designed and constructed
over 540 Million Gallons
of drinking water storage
facilities throughout
California
City of Woodland
Bakersfield
Lompoc
Ventura
Santa Monica
San Diego
Imperial
Simi Valley
County of Orange Corona
Tesoro Viejo, Inc.

West Kern WD
Twentynine
Palms WD
Santa Clarita Valley Water Agency
Metropolitan WD
Calleguas MWD
Camrosa WD
Huntington Beach-PWD
Golden State Water Co.

Sunrise Power Co., LLC
Kern Country-Water
Bank Authority
Burbank Water & Power
Burbank
Cucamonga County WD
Elsinore Valley MWD
Rancho CA WD
Valley Center MWD
Padre Dam MWD
Otay WD
Cucamonga County WD
San Bernardino MWD
Fallbrook Public Utility District Vallecitos WD
Vista Irrigation District
Kennedy Jenks Southern California Reservoir Project Clientele City Steel Tank
LEGEND
28 KENNEDY/JENKS CONSUL TANTS, INC.
2 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
2 Project Analysis
Project Understanding and Anticipated Challenges
The District owns and operates water distribution, treatment, and groundwater pumping facilities that serve approximately 80,000 residents. The District maintains a water distribution system that includes approximately 40 water storage tanks within the City of Simi Valley and unincorporated areas of Ventura County.

The District is engaged in a long-term effort to provide a robust and reliable water delivery system for its citizens and water users. Based on a Seismic Evaluation of the Waterworks Storage Tank System conducted in 2020, the District is proceeding with the design of Stow Tank No. 1 Replacement. The District anticipates design completion in May 2026 and construction completion in the Winter of 2028.

Existing site access road entrance
Existing access road driveway off Yosemite Ave
KJ designed your System-Wide Tank Seismic
Evaluation, provided on-call structural
improvements to the East Walnut and Box Canyon
tanks, and is designing the Box Canyon Pumping
System. As a result, we:
• Understand your existing tanks and their
deficiencies
• Understand your pump station design preferences
• Are familiar with your on-call processes and
District inner workings
The existing Stow Tank No. 1 has been in
service since 1960. It is a welded steel on-grade
structure approximately 75 feet in diameter and
32 feet high, with a nominal storage capacity of
1,000,000 gallons.

The District plans to replace the existing tank with
a new welded steel tank of the same volume that
meets current seismic codes. The District has
indicated that temporary storage does not need
to be provided during construction, which makes
replacing the tank relatively straightforward.

However, there are still challenges that may need
to be addressed, including:
• Constrained access road for delivery of
steel plates and materials: The existing
access road from Yosemite Ave is narrow
and has curves. It will be difficult for large
vehicles to deliver steel plates and materials
to the tank site. It is anticipated that one
lane on Yosemite Ave will require shutdown
while delivering certain items to facilitate
offloading and transfer up the access road.

Map Data © 2023 Google EarthMap Data © 2023 Google Earth 29 KENNEDY/JENKS CONSUL TANTS, INC.
3 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
2 | Project Analysis
Limited space available for construction
Existing retaining wall along perimeter road
Potential alignment for new tank inlet pipeline
• Constructing a new tank while avoiding damage to the existing retaining wall and waterlines:

There is an existing retaining wall around a portion of the tank perimeter road and an existing waterline along the north side of the tank. Space is limited for demolition of the existing tank, site/ ground surface preparation, construction of a new concrete ringwall, and erection of the new tank. • Constructing separate inlet and outlet pipelines
with limited available space:

It is proposed that the existing common inlet/
outlet pipeline be replaced with separate
inlet and outlet pipelines to satisfy Division
of Drinking Water requirements. Ideally, the
separate pipelines will be located approximately
180 degrees apart. This will require construction
of the new inlet pipeline within the tank
perimeter road, where there is limited space.

Existing drain/overflow box
• Replacement of existing drain/overflow box:

Demolition of the existing tank and construction
of the new concrete ringwall will require
demolition and reconstruction of the existing
tank drain/overflow box. Reconstruction of the
tank drain/overflow box will permit the District
to improve the air gap separation and improve
provisions for dechlorination before to discharge
to surface waters.
30 KENNEDY/JENKS CONSUL TANTS, INC.
4 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
2 | Project Analysis
Existing site with potential slope stability issues
• Potential site slope stability issues:

The Stow tank site is located on a north-
northwest-trending narrow ridgeline underlain
by claystone bedrock of the Santa Susana
Formation that dips favorably to the northwest
at about 25 degrees (Dibblee, 1992b). The tank
pad appears to have been created by cut/fill
grading; fill materials appear to have been placed
along the outer part of the tank pad subparallel
to the ridgeline to widen the narrow tank pad.

Common cracking to about 1/2-inch in width
has occurred in the pavement areas subparallel
to the ridgeline slopes and around the tanks.

The cracking is suggestive of fill settlement and
potential downslope creep.
• Previous studies indicated that the observed
steep slope conditions, proximity to the top of
the descending slope, outward rotation of the
curb/gutter, and the settled asphalt concrete on
the western side of the tanks, combined with
the gaps observed under the eastern sides of
the tanks, suggest westward tipping/downslope
movement that has occurred in the western side
of the site.
• Lack of required freeboard in existing tank:

Previous seismic calculations indicate that
approximately 6.5 feet of freeboard is needed
between the high water elevation and the tank
roof. The existing tank only has about 2 feet
of freeboard. Therefore, the new tank, with a
cone-style roof, will likely be approximately 4.5
feet taller than the existing tank in order to meet
freeboard requirements. If the District prefers
a knuckle-style roof instead of a cone style, the
tank could potentially be approximately 7.5 feet
taller than the existing tank.

View of existing tank from Iroquois Court
Map Data © 2023 Google EarthMap Data © 2023 Google Earth 31 KENNEDY/JENKS CONSUL TANTS, INC.
5 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
3 Objective, Scope, Nature of Proposed Program
Overall Project Approach
Project Objective and Statement of Work
KJ will prepare a complete set of design documents for the construction of the replacement tank for Stow Tank No. 1. The replacement tank will be located at the same site as the existing tank and at the same floor/ overflow elevations with the same storage volume. The replacement tank will be a welded steel tank founded on and anchored to a concrete ringwall and designed to current seismic codes. The replacement tank will incorporate the District’s storage facility standards and include provisions for efficient operation/ maintenance, corrosion protection, and improved water quality.

KJ has assembled a team that can deliver your
project with the utmost efficiency . We will provide
project management and facilitate team coordination
and communication to complete preliminary design,
final design, bid support, and engineering support
services during construction. We will deliver clear,
concise construction bid documents so your project
can bid in the summer of 2026 and be successfully
constructed to meet your project schedule.

Using proven processes and tools, KJ will assure the District that the project will be completed on time and within budget while appropriately addressing project risks and informing you of progress. Our project management approach is based on developing a partnership with you to clearly understand your requirements and prepare, communicate, and execute a Project Work Plan that supports successfully delivering your project on budget and on time. With Jeff Savard as your Project Manager (PM), you have a highly qualified PM who consistently uses proven processes and tools to inform you of project status. Our effective project management goes beyond establishing a schedule, developing budgets, and assigning personnel; it includes communicating effectively with you and responding proactively to problems or changes. It also consists of the flexibility to adapt and modify our strategies to meet your needs in accomplishing the project objectives.

Our project manager and engineer have been
involved in several storage tank projects
with the District over the last 25 years and
recently worked with the District to complete
the system-wide seismic study.

KJ has previously designed several tanks for the District, including Lower McCoy Reservoir, Recycled Water Tank, and Aerator Tank. The design approach for Stow Tank No. 1 Replacement will be similar to those for the previous tanks. We have a good understanding of the key issues associated with your project and the experience and expertise to address these issues. Several of the issues that we have identified for your project include:
1 2 3 4 5
Documenting
District
standards/
preferences
for steel tank
replacement
projects.

Increasing
reliability/safety
with proven
seismic design.

Adressing
potential site
slope stability
concerns.

Providing
comprehensive
protection from
corrosion.

Addressing site
constructability
issues.
32 KENNEDY/JENKS CONSUL TANTS, INC.
6 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
3 | Objective, Scope, Natur
e of Proposed Program
Project Understanding and Anticipated
Challenges
KJ has designed welded steel tanks for many clients,
and each tends to have specific requirements
for tank features and appurtenances. We have
developed an extensive CAD library of standard tank
appurtenances based on many years of designing
welded steel tanks, and we provide value in selecting
and arranging these appurtenances based on client
preferences. KJ designs tanks in conformance with
the currently adopted building codes and national
standards such as AWWA, OSHA, and NFPA.

KJ worked with the District on the design of the Lower McCoy tank approximately 10 years ago. We spent a lot of time with the District staff fine tuning the project's design details, including appurtenances for inlet/outlet pipelines, overflow, drain, ladder/platform, manway, and flush type cleanout. For that project, the District was also interested in including a spiral staircase, and now it is our understanding that the District is also interested in seismic shutoff valves. KJ will revisit these design details with the District and update details of the tank features, appurtenances, materials, and requirements for conformance with the latest building codes and national standards.

Overflow/Drain Box Detail from the District’s Lower McCoy Reservoir
The Stow Tank No. 1 replacement project is the first of several tanks that the District plans to replace in the near future. Updating tank design standards will provide guidance for future tank replacement projects for the District.

In addition to our knowledge of the typical details associated with steel tanks, we also have experience addressing water age/quality within tanks using different approaches. These approaches include:

We understand the District currently utilizes a PAX mixing system for the existing tank and is interested in converting to Big Wave mixing system for the new tank. For the Stow Tank No. 1 Replacement, we are also planning to include a separate inlet pipeline routed around the east side of the tank approximately 180 degrees from the outlet pipe. Including separate inlet and outlet pipelines will help reduce water age and adhere to Division of Drinking Water, and reservoir guidelines.
• Separate inlet/outlet pipelines
• Interior piping with duckbill nozzles
• Baffling
• Mixers
• Chlorine addition and monitoring
• Recirculation pumps
33 KENNEDY/JENKS CONSUL TANTS, INC.
7 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
3 | Objective, Scope, Natur
e of Proposed Program
Increasing Reliability/Safety with Proven
Seismic Design
Seismic analysis of the tank will be performed in
accordance with Section 13 of AWWA D100. The analysis
methodology and approach are as follows.

References: Listed below are the significant codes and
standards that will be utilized in the seismic analysis.

Seismic Design Criteria: Seismic design criteria are established in accordance with Section 13 of D100 and ASCE 7. Spectral accelerations and coefficients for the tank sites are obtained from the United States Geological Survey (USGS). The code design earthquake is based on probabilistic ground motions with a 2% in 50-year hazard level. The code intention is that the tank structure will incur some structural damage, but remain operational after strong seismic shaking.

Seismic Importance Factor: The 2022 CBC and D100-21 define seismic importance factors (I E). The CBC provides more precise definitions, with 4 Risk Categories (as opposed to D100-21, which represents three categories), and is used to define IE for the calculations.

Seismic Failure Modes: The following failure modes are
of primary concern in welded steel tanks subjected to
earthquake loads.
• Overturning: Static load on tank shell from stored
water and dynamic loads from the movement of
water mass inside the tank during an earthquake
combine to create an overturning moment tending
to “topple” the structure.
• Sliding: The static load on the tank shell from stored water and dynamic loads from the movement of
water mass inside the tank during an earthquake combine to create a lateral force on the shell, which tends to laterally displace the structure.
• Shell Compression Buckling: Longitudinal compression force on the tank shell can cause local buckling • Shell Tensile Hoop Stresses: The static load on the tank shell from stored water and dynamic loads from the movement of water mass inside the tank during earthquakes combine to create radial stresses on the shell plates.
• Roof and Column Failure Due to Sloshing Waves: In an earthquake, the movement of the mass of water inside the tank causes the upper portion of the water mass to be subjected to wave action, also known as “sloshing.” These “waves” can damage roof plates and roof framing members.

Providing sufficient freeboard to account for sloshing, anchorage to resist sliding and overturning, and reinforced piping connections to prevent pipe failures are methods used to address these seismic failure modes. • ANSI/AWWA D100-21 – Standard for Welded
Steel Tanks for Water Storage
• American Society of Civil Engineers (ASCE) 7,
2022 Edition
• California Building Code (CBC), 2025 Edition
• SP 117A (2008) – Guidelines for Evaluating and
Mitigating Seismic Hazards in California
34 KENNEDY/JENKS CONSUL TANTS, INC.
8 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
3 | Objective, Scope, Natur
e of Proposed Program
Addressing Potential Slope Stability Concerns
Previous studies have indicated a concern with downslope movement occurring on the site's western side.

Considering that the District wants a replacement tank that meets all current codes, including seismic, addressing slope stability must be provided as part of the design services for this project. We plan to look at global slope stability of the adjacent hillsides, given the age of the existing tanks and the fact that the Northridge earthquake impacted the site. Previous studies indicate that the regional bedding is favorable at the site, and our recent field visit did not reveal a global slope stability issue.

Our approach includes reviewing the slopes that descend from Stow Tank No. 1 to the south, west, and northeast and checking factors of safety on the steepest slope. The existing slopes do not appear steeper than 2:1, and if the geology is favorable, the slope stability check will likely not be too rigorous. The analysis results will be included in the project’s Geotechnical Report.

KJ has partnered with Yeh & Associates to evaluate this project's geotechnical and slope stability. KJ and Yeh have worked together on numerous water tank projects in recent years and are currently addressing similar issues on other projects.

Providing Comprehensive Protection from
Corrosion
KJ has designed almost 20 welded steel tanks in the
region, and our Project Manager has been involved in
more than a dozen of these projects. We understand
the importance of protecting the steel structure from
corrosion and take extra steps in the design documents
to provide that protection. KJ does not simply rely on
tank fabricators for design details.

Our typical approach is to provide a robust protective
coating system on the exterior and interior, and cathodic protection systems for the steel floor plates and tank
interior. These cathodic protection systems are typically of the sacrificial anode type.

Our coating systems typically include zinc-rich primer
epoxies and polyurethanes on the tank exterior and
epoxies on the interior. We require an inorganic zinc-
rich primer before applying epoxy to protect against the aggressive atmosphere inside the tank above the high
water line. We also typically require that the underside of the steel floor plates receive an inorganic zinc-rich primer before installation.
35 KENNEDY/JENKS CONSUL TANTS, INC.
9 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
3 | Objective, Scope, Natur
e of Proposed Program
Summarized below are some key points and/or benefits our technical specifications provide related to tank welding and protection from corrosion. Our technical specifications will require that the Contractor provide:
1 The services of certified
welding inspectors for
welding inspection and
testing before, during, and
after welding.
2 3
Inspection and testing for
each welded joint or
member, whether the work
is performed in the shop or
the field.

Welder performance
qualification test records,
written welding procedure
specifications, and welding
procedure qualification
records for all welds.
4 Welding non-destructive
examination (NDE)
records for all radiograph
inspections, including shop
and field inspection reports.
5 6
Testing all weld seams
by the water method
before painting.

Special welding in
accordance with API 650
for weld details at the
bottom edge of reinforcing
plates for pipe penetrations
and manways.
7 Providing 100% lap seal
welds on the underside of
the roof and continuous
fillet welds between purlins
and the underside of the
roof plates.
8 9
Continuous fillet welds
around lapped surfaces
at all purlin and rafter
connections.

Faying of all surfaces
to be coated before
assembly or erection,
and all faying surfaces
to be sealed with NSF 60
approvedjoint sealant if
not seal welded.
36 KENNEDY/JENKS CONSUL TANTS, INC.
10 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
3 | Objective, Scope, Natur
e of Proposed Program
Addressing Constructability Issues
Based on recent similar projects, KJ has a thorough knowledge of construction sequencing for a tank project and has identified several issues to be addressed in the design documents for this project:
• Limited space for contractor staging and
storage: There is limited staging room at the
tank site, and additional space will likely be
needed. One option is a small triangular piece of
District property right outside the fence on the
east side of the tank.
• Constrained access driveway: Due to constraints
associated with the tank access road, the
contractor will likely have to offload materials
on Yosemite Avenue for transfer to the tank
site. The design documents will specify the
contractor to prepare and submit traffic control
plans to the City for any lane closures required
on Yosemite Avenue.
• Potential damage to existing retaining walls,
curbs, and fencing: Space at the site is limited,
and it is anticipated that damage to the existing
retaining walls, curbs, and fencing may occur
during construction. We propose including
design details in the design documents for
replacing the existing wall, curbs, and fencing
should damage occur. We will also consider
including unit price bid items in the bid schedule
for these items to help facilitate the correction
of any damage done to the site.

Map Data © 2023 Google EarthMap Data © 2023 Google Earth 37 KENNEDY/JENKS CONSUL TANTS, INC.
11 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
4 Work Program
The following scope of work was prepared based on
the District's RFP and our experience on similar tank
replacement projects.

A – Project Management
Task 1.1 Project Initiation
KJ shall set up the project within KJ’s accounting
system, prepare subconsultant agreements, issue a
Project Work Plan to their team, outlining the scope
and budget, and develop a baseline schedule in
Microsoft Project format. This task will also include
conducting a virtual kickoff meeting with district staff (the meeting is assumed to be one hour long, with up
to five KJ staff participating). KJ shall prepare the
agenda and minutes for the kickoff meeting.

Task 1.2 Project Monitoring/Tracking
KJ shall provide project management and
administration to execute the work. This shall consist
of project administration related to schedule, budget,
and scope management. KJ will also prepare monthly
progress reports to accompany monthly invoices.

Task 1.3 Bi-Weekly Meetings
KJ shall conduct bi-weekly meetings with District
staff throughout the project's design. These meetings
will be virtual and last 30 minutes. It is assumed
that up to 22 bi-weekly meetings will occur, with up
to 2 KJ staff participating. KJ will utilize a standard agenda for each meeting and track action items and
decisions.

Task 1.4 Quality Assurance and Quality Control
(QA/QC)
KJ will provide QA/QC reviews of deliverables before
submission to the District from a Senior KJ engineer,
not directly associated with the project, to provide an independent design review.

B – Pre-Design Services
Task 2.1 Data Collection and Review
KJ shall collect and review available data and record
drawings and inspection reports provided by the
District.

Task 2.2 Site Visit
KJ shall conduct one site visit prior to developing the 30% design. The project manager, project engineer,
civil design lead, electrical design lead, and deputy
project manager will attend this site visit, which will provide the district staff with a walk-through of the
anticipated design elements.

Task 2.3 Survey
This task includes conducting a ground survey of the
Stow Tank No. 1 site by KJ’s specialty subconsultant,
Benner and Carpenter, Inc. (B&C). The ground survey
is proposed to cover only the area around Tank No. 1
and not include Tanks 2, 3, and 4. However, surveying
the entire area with all four tanks can be provided if
requested by the District.

According to standard practice, the ground survey
will locate above-ground features such as the tank,
structures, walls, roads, fences, trees, etc.. Based
on the record information, B&C will use the ground
survey to prepare a Civil 3D ACAD Drawing file
showing the above-ground features, spot elevations,
1-foot contours, and property lines.

Task 2.3 Deliverables
• Survey Drawing File (electronic, Adobe pdf).

Task 2.4 – Geotechnical Services
This task includes geotechnical services and
consultation relevant to the design of the
replacement tank by KJ's specialty subconsultant,
Yeh and Associates, Inc. (Y&A). Y&A will provide the
following geotechnical services:
• Collect and review geotechnical data from
previous reports and incorporate these data
into baseline information for the geotechnical
evaluation.
38 KENNEDY/JENKS CONSUL TANTS, INC.
12 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
4 | Work Program
• In preparation for boring sampling, conduct
site reconnaissance, mark the explorations'
locations, and contact USA. Oversee/coordinate
track-mounted drilling for a maximum of two
days at three (3) locations to depths of 50 feet
maximum around the existing Stow Tank No. 1.
• Conduct a seismic refraction and multi-channel
analysis of surface waves (MASW) survey
during a one-day field program and record
seismic refraction tomography and MASW data
along two 150- to 200-foot-long survey lines.

Combine this survey's seismic compressional
and shear-wave velocity profiles with available
geologic data to characterize subsurface
geology. Use the 1D shear-wave velocity profiles
to evaluate the average shear-wave velocity of
the upper 30 meters (Vs 30m) for determination
of the NEHRP and ASCE 7-22 seismic site
classifications and use with AWWA/building
codes, and applicable to Stow Tank Nos. 1
through 4.
• Provide a geologist to conduct a reconnaissance
of the existing slope to look for visual evidence
of adverse geologic structure, erosion, slope
instability, or creep that could impact the tank
sites. Review published geologic maps, aerial
photographs, and available geotechnical data
for the project site to look for evidence of slope
instability, extent of sidehill fills, or drainages
that should be considered in the subsequent
analyses.
• Perform laboratory testing on selected samples
recovered from field exploration program(s) to
characterize the geotechnical properties of soil
encountered.
• Prepare a Geotechnical Report for the project's
design that summarizes the previous and
new data collected and presents geotechnical
analyses. A report draft will be prepared and
issued for review by KJ and the District. A
final report will be issued and will incorporate
comments from KJ and the District.

Task 2.4 Deliverables
• Draft Geotechnical Report (electronic, Adobe
PDF).
• Final Geotechnical Report (electronic, Adobe
PDF).

C – Design Services
The design scope is based on preparing documents
for replacing the tank at the same location and
volume described in the District’s RFP and our
proposal. The scope also includes improvements
spanning approximately 15 feet outside the tank
for a new inlet pipeline and reconnecting the outlet
pipeline, drain/overflow pipeline, and electrical/
instrumentation equipment. The scope does not
include any improvements to the existing access
road, slopes, or any other site modifications
that extend beyond 15 feet from Tank No. 1.

The anticipated drawing list for the proposed
improvements is provided at the end of this scope
of work.

Task 3.1 30% Design/Preliminary Design Report
KJ shall prepare 30% Design/Preliminary Design
Report which establishes the project’s basis of
design, documents design criteria, and identifies
the proposed improvements. A limited number of
preliminary drawings will be developed and a list of
technical specifications will be provided. KJ will also prepare an OPCC that conforms to AACE Class 2.

Task 3.1 Deliverables
• 30% Drawings (electronic, 22”x34” Adobe
PDF).
• Draft and Final Preliminary Design Report
(electronic, Adobe PDF).
• Class 2 OPCC (electronic, Adobe PDF).

Task 3.2 – 60% Design
KJ will incorporate District comments from the 30%
design to prepare design plans in accordance with
the District’s Standards to the 60% level. Drawings
and technical specifications for the project will be
prepared to the 60% level. KJ will also prepare an
OPCC that conforms to AACE Class 3.
39 KENNEDY/JENKS CONSUL TANTS, INC.
13 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
4 | Work Program
Task 3.2 Deliverables
• 60% Drawings (electronic, 22”x34” Adobe
PDF).
• 60% Specifications (electronic, Adobe PDF).
• Class 3 OPCC (electronic, Adobe PDF).

Task 3.3 90% Design
KJ will incorporate District comments from the 60%
design to prepare design plans in accordance with
the District’s Standards to the 90% level. Drawings
and technical specifications for the project will be
prepared to the 90% level. KJ will also prepare an
OPCC that conforms to AACE Class 3.

Task 3.3 Deliverables
• 90% Drawings (electronic, 22”x34” Adobe
PDF).
• 90% Specifications (electronic, Adobe PDF).
• 3. Class 3 OPCC (electr onic, Adobe PDF).

Task 3.4 100% Design
KJ will incorporate District comments from the
90% design to prepare the final 100% design plans.

Design drawings will be signed and stamped by the
respective Engineers of Record. Specifications for
the project will be prepared to their final 100% design level. Calculations required to support the design will be prepared and submitted. KJ will also prepare a
final OPCC that conforms to AACE Class 3.

Task 3.4 Deliverables
• 100% Drawings (22”x34” Adobe PDF).
• 100% Specifications (electronic, Adobe PDF).
• 100% Calculations (electronic, Adobe PDF).
• Class 3 OPCC (electronic, Adobe PDF).

D – Bid Support Services
Task 4.1 Pre-Bid Meeting
KJ will attend one pre-bid meeting/site visit to be
conducted by the District for prospective bidders
during the bidding process. The pre-bid meeting is
to be conducted so that prospective bidders can
become acquainted with site, equipment laydown/
staging areas, and other key logistical issues. The
meeting will be attended by the Project Manager. It is
assumed that the District will prepare and issue the
agenda, presentation, and minutes for the meeting.

Task 4.2 – Response to Bidders’ Questions and
Addenda Preparation
KJ will respond to bidders’ questions for up to two
(2) addenda during the bid period to clarify the
contract documents, with distribution of all addenda
by the District. KJ will also provide answers to
written questions submitted to the District by bidders
and provided in writing to KJ. Contract bidding
documents that are changed as a result of questions
and answers will be provided for the issued addenda.

It is assumed that the District will issue up to two (2) addenda.

Task 4.2 Deliverables
• Written answers to bidders’ questions for up
to two addenda (electronic, Adobe PDF).

Task 4.3 – Conformed Documents
KJ will produce one set of Conformed Documents
based on the addenda produced during the bidding
process.

Task 4.3 Deliverables
• Conformed Documents (electronic, Adobe
PDF).

Assumptions

1. It is assumed that the project duration will
be 12 months, 10 months for design and 2
months for the bid period.

2. The District will provide timely reviews
of submittals. The District will provide
adjudicated and consolidated review
comments in a matrix format on
deliverables within 10 working days of
receipt of deliverables.
40 KENNEDY/JENKS CONSUL TANTS, INC.
14 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
4 | Work Program

3. It is assumed that site disturbance will be
less than an acre, and a SWPPP will not be
required.

4. As-built information for the project site,
waterlines, electrical equipment, and
drainage facilities is available and will be
provided by the District.

5. The District will provide access to the site
and any permits for all work.

6. The District will locate utilities within
the existing facility prior to geotechnical
exploration and survey.

7. Prepurchase documents for equipment and
associated bid services are not included.

8. Permitting and permit fees are not
included.

9. Replacement of the existing service
transformer or other coordination with SCE
is not included.

10. Motor-operated valve control schematic
to be provided by vendor as part of the
submittal. A control schematic is not
included.

11. The scope of electrical work does not
include providing a new power circuit for
equipment, device or instrument that is
being replaced. Existing circuit breakers
and new wiring will be utilized for new
equipment or instruments.

12. New enclosed structures or canopies are
not included.

13. Landscaping services are not required.

14. KJ CAD Standards, front-end drawings,
standard details, and template files will be
used where client CAD Standards are not
provided.

15. Preparation of traffic control plans will be
conducted by the contractor.

16. Preparation of legal descriptions for new
easements is not required.

17. Design of retaining walls is not required.

18. Design of storm drains is not required.

19. Design of new site lighting is not required.

20. Design of improvements to the existing
slopes, access road and access gates is
not required.

21. Design of instrumentation and controls,
SCADA network block diagrams, or system
integration is not required.

22. The proposed geotechnical services, Task

2.4, do not include:
• Responsibility for damage resulting from
encountering unmarked or mismarked
utilities during field exploration.
• Planning for or including rock coring for
the work.
• Recommendations to mitigate
liquefaction, which is not anticipated.
• Additional field exploration, evaluation of
alternatives, or recommendations in the
final geotechnical report for improvements
that are not described in this proposal.

Sheet
No.

Drawing
No. Drawing Title 30% 60% 90% / 100%
General
1 G-001 Cover, Location, and Vicinity Maps X X X
2 G-002 Drawing Index X X X
3 G-003 General Abbreviations X X X
Proposed Drawing Index
41 KENNEDY/JENKS CONSUL TANTS, INC.
15 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
4 | Work Program
Sheet
No.

Drawing
No. Drawing Title 30% 60% 90% / 100%
Civil
4 G-004 General Notes, and Legend X X X
5 G-005 Title 22 Reservoir Regulations X X
Demolition
6 D-001 Existing Conditions, and site Demolition Plan X X 7 C-001 Civil Abbreviations, and Notes X X
8 C-002 Civil Legend X X
9 C-003 Civil Standard Details X X
10 C-100 Overall Site Plan X X X
11 C-101 Horizontal Control, and Paving Plan X X
12 C-201 Grading, and Drainage Plan X X
13 C-301 Yard Piping Plan X X X
14 C-501 Details - 1 X
15 C-502 Details - 2 X
Structural
16 S-001 Structural General Notes X X
17 S-002 Structural Special Inspection, and Testing Schedules X X 18 S-003 Structural Standard Details - 1 X X
19 S-004 Structural Standard Details - 2 X X
20 S-101 Tank Foundation, and Orientation Plan X X X
21 S-102 Tank Typical Cross Section X X X
22 S-103 Tank Details - 1 X X
23 S-104 Tank Details - 2 X X
24 S-105 Tank Details - 3 X X
25 S-106 Tank Details - 4 X X
26 S-107 Tank Details - 5 X X
42 KENNEDY/JENKS CONSUL TANTS, INC.
16 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
4 | Work Program
Sheet
No.

Drawing
No. Drawing Title 30% 60% 90% / 100%
27 S-108 Tank Details - 6 X X
Cathodic Protection
28 CP-001 Cathodic Protection Site Plan X X
Civil
29 CP-002 Cathodic Protection Details - 1 X X
30 CP-003 Cathodic Protection Details - 2 X X
31 CP-004 Cathodic Protection Details - 3 X X
Electrical
31 E-001 Electrical Notes, and Abbreviations X X
32 E-002 Electrical Legend - I X X
33 E-003 Electrical Legend - II X X
34 E-004 Electrical Standard Details X X
35 E-010 Overall Site Plan X X
36 E-020 Single Line Diagram/Panelboard Schedule X X X
37 E-030 Conduit Block Diagram/Conduit Cable Schedul X X 38 E-100 Reservoir Equipment Plan X X
Instrumentation
39 I-001 Instrumentation Legend and Notes X X
40 I-002 Instrumentation Standard Details X X
41 I-003 P&ID X X X
43 KENNEDY/JENKS CONSUL TANTS, INC.
17 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
5 Methodology
To meet the specific needs and expectations of the Stow Tank No. 1 Replacement project, KJ offers a proven track record in managing complex water storage tank projects. We work closely with clients to deliver comprehensive planning, design, construction, and start-up services. Our approach is customized to meet your unique requirements and budget, ensuring we provide the services you need. Our team will tailor our services to align with your budget, schedule, and project goals as outlined in the scope of work. This ensures we deliver a high-quality, cost-effective solution that meets your expectations.

Detailed Task Development for a Comprehensive Understanding KJ’s experience in successfully undertaking tank replacement contracts gives us the confidence that our team, led by Jeff, will meet your expectations. We use a defined process for task development, incorporating a practical task authorization approach. This initial plan guides our team in defining and meeting the District’s scope of work requirements and service goals. Based on your feedback, we will provide you with a draft of the proposed approach and fine-tune it further. We will submit the final plan for approval and mobilize our team to begin execution upon Notice to Proceed.

Comprehensive Project Implementation
The KJ team will collaborate with the District through every step of the project implementation process to ensure the new Stow Tank No. 1 meets your expectations. Our dedicated team will be involved from preliminary design through construction, guaranteeing that a consistent vision and design are implemented. This process allows the District to provide input at key stages while the KJ team handles the heavy lifting and represents your best interests with other interested parties.
• 30% Design – District buyoff
on general project concepts
and plans
• 90% Design – District review
of all bid documents
• 100% Design – Finalize
bid documents for
advertisements
• Organize Bidding Process
– Attend pre-bid meeting
and support District
administration
• Answer Bidding Questions –
Issue clarifications in timely
manner
• Evaluate Bids – Verify
apparent low bidder meets
bidding requirements
• Engineering Support
During Construction
– Review materials for
compliance, provide design
clarifications, and support
system startup
Design Bidding Construction
Methodology and Techniques to be Employed
We developed the methodology and techniques for the Stow Tank No. 1 Replacement project to ensure a comprehensive, efficient, high-quality design process. Here is an overview of our approach:

Data Collection and Site Visits
• Data Collection: Gather all relevant data, including existing plans, studies, and inspection reports provided by the District.
• Site Visits: Conduct site visits to assess the current condition of the existing tank and the surrounding area, which includes surveys and geotechnical investigations to gather necessary information for the design. 44 KENNEDY/JENKS CONSUL TANTS, INC.
18 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
5 | Methodology
Preliminary Design Report (PDR)
• Basis of Design: Prepare a Preliminary Design Report (PDR) that outlines the basis of design, including construction methods that are cost-effective and minimally disruptive to the public. • Seismic Standards: Confirm and document that the design adheres to modern seismic standards to address the identified deficiencies and enhance the new tank's reliability and safety.

Detailed Design
• Civil, Structural, Mechanical, Electrical, and Instrumentation Designs: Develop comprehensive designs for all relevant engineering disciplines, including detailed project plans and specifications. • Design Calculations: Perform all necessary calculations to support the design, ensuring accuracy and compliance with regulatory requirements.
• Coordination with Consultants: Work closely with the District's consultants to incorporate their comments into the and specifications.

Project Management
• Kickoff and Progress Meetings: Attend the design kickoff and bi-weekly progress meetings to report on the design work.
• Project Schedule: Prepare a detailed project schedule in Microsoft Project format, including design milestones and status updates.
• Monthly Progress Reports: Provide monthly progress reports to accompany invoices, ensuring transparency and accountability.
• Quality Control/Quality Assurance (QC/QA): Implement QC/QA procedures for all deliverables to ensure they meet the highest quality standards.

Opinion of Probable Construction Cost (OPCC)
• Cost Estimates: Prepare OPCC at 30%, 60%, 90%, and 100% design levels. The OPCC helps manage the project budget effectively and ensures that the design remains cost-effective.

Bid Support Services
• Technical Specifications and Bid Documents: Prepare technical specifications and construction bid documents using the District's standard specifications. • Pre-Bid Meetings: Attend pre-bid meetings and site visits to provide necessary support and clarification to potential bidders.
• Bidder Inquiries: Respond to bidders' questions during bidding for a smooth and transparent bidding process.
• Conformed Documents: Produce a set of conformed documents based on the addenda issued during the bidding process.

Construction Support (if requested)
• Construction Phase Services: Provide support during the construction phase, including attending meetings and addressing design-related issues.

By employing these methodologies and techniques, the project team will ensure a thorough, efficient, and high- quality design process for replacing Stow Tank No. 1.
45 KENNEDY/JENKS CONSUL TANTS, INC.
19 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
6 Project Management
An Experienced Project Management Team You Know and Trust Project Management
This section describes the interaction and cooperation between owner and engineer, the steps to implement the approach, and the steps we take in tracking the project to meet the project schedule, budget, and quality assurance/quality control objectives for the District. While evaluation projects inherently involve in unknown conditions. Our approach anticipates and manages the risks to keep the project on track.

Our project implementation practices include strict adherence to communication-centered project management and quality assurance and control practices. The development of this project will require careful attention to detail in implementing of the tasks identified in our proposed approach.

Through our numerous tank projects, we have developed effective project management methods and planning tools to see to it that client needs are consistently at the forefront of any project effort. These established techniques put in place the mechanisms for control of quality and adherence to the project scope, schedule, and budget.

Responsiveness
Our business model involves providing responsive, client-centered consulting services. Working in close partnership with our clients, KJ responds creatively and sensitively to their specific needs.

We will respond to your inquiries in a timely manner, stay within budget, and maintain schedules to meet important deadlines. KJ will develop solutions tailored to the district's special needs.

Approach Implementation Steps
Our steps to implement our management approach include:
• Project Kick-off Meeting
• Concept and Criteria Review Meetings
• Recurrent Client and Project Meetings and Conference Calls • Workshops to Discuss Issues and Solutions, Make decisions, and Achieve Consensus • Project Status Reports (PSRs)
• Monthly Status and Billing Reports
These methods and tools have been proven in our practice to provide consistent, ongoing communications of the work-in-progress and provide the District with an opportunity for structured input at all project stages. They also allow District staff and the project team to identify potential problems in advance, so they can be resolved promptly and eliminate scheduling delays and budget variance. 46 KENNEDY/JENKS CONSUL TANTS, INC.
20 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
6 | Project Management
Factors for Successful Performance and Completion
Our approach to project management includes preparing of a detailed work plan complete with important communication and meeting points and a list of deliverables. In addition, cost control functions flow out of the work plan developed for overall project planning.

The key aspects of our management philosophy and measures for a successful completion of this project include:
• Cost/Schedule Control
• Project Tracking Methods and Status Reporting
All these measures have been effectively applied on previous projects resulting in smooth work progress and successful completion of the assignment that met or exceeded the Client’s expectations. The following discussion explores these measures.

Cost/Schedule Control
Effective cost control begins with identifying of the total scope of work, establishing realistic timelines for project implementation, and preparing of an accurate and appropriate budget. The Project Manager can implement corrective actions such as ensuring the team optimizes task execution and production of deliverables or re-evaluating tasks and deliverables with the District.

We will implement a cost reporting system, combining budget control, commitment control, and cost control. It provides an effective management tool to summarize financial commitments, compare the cost-at-completion to the budget, track commitments, and identify variations from the budget.

Project Tracking Methods and Status Reporting
Our budget and project schedule have the same tasks and sub-task structure, so budget expenditures can readily be compared to the project schedule. Hence, the performance with respect to both time and budget can be readily tracked.

Our status reporting approach includes developing and providing a narrative progress report of specific accomplishments during the reporting period, problems encountered or anticipated, activities scheduled for the next reporting period, and results of quality control programs, technical evaluations, inspections, etc.

We will provide a monthly cost report, broken down by tasks or sub-tasks that shows the current period and cumulative expenditures to date, the approved budget, and the budget balance remaining. Cost reports will be prepared monthly basis throughout the project.
47 KENNEDY/JENKS CONSUL TANTS, INC.
21 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
6 | Project Management
Proposed Management Structure
Project Management
The project management for the Stow Tank No. 1 Replacement will be led by Jeff who is registered in the State of California as a Civil Engineer. Jeff will be responsible for overseeing all consultant services and ensuring that the project stays on track, within budget, and meets all technical specifications.

Key Roles and Responsibilities
• Project Manager, Jeff Savard: Responsible for overall project management, including attending the design kickoff meeting, bi-weekly progress meetings, preparing project schedules, monthly progress reports, and ensuring quality control/quality assurance (QC/QA) for all deliverables. • Project Engineer, Don Barraza: A registered Civil Engineer in the State of California and the Chairman of the American Waterworks Associations Standard for Conventional Concrete Water Storage Tanks with over 38 years of experience leading project teams in the design of welded steel and concrete drinking water reservoirs in high seismic regions.
• Technical Personnel: The project team will include technical personnel with relevant experience in civil, structural, mechanical, electrical, and instrumentation design.

Organization of Project Team
Consultant and Subconsultants
The project team will consist of the primary consultant and any necessary subconsultants. The primary consultant will coordinate with the District’s consultants to incorporate their comments and edits into the plans and specifications. The subconsultants may be responsible for specific tasks such as data collection, site visits, surveys, and geotechnical investigations.

Coordination and Communication
The Project Manager will ensure effective coordination and communication among all team members and interested parties. This includes regular progress meetings, detailed project schedules, and monthly progress reports. The Project Manager will also be responsible for coordinating with the District’s consultants and incorporating their feedback into the design.

Facilities Available
Office Space and Equipment
The consultant will provide all necessary office space, equipment, and materials required to perform the work.

This includes technical, administrative, and professional personnel, as well as supplies, vehicles, transportation, and office facilities.
48 KENNEDY/JENKS CONSUL TANTS, INC.
22 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
7 Assigned Personnel
KJ has assembled a comprehensive project team of in-house personnel with specialized and expert services to meet the scope of work. Our team has successfully addressed similar projects for various water agencies throughout Southern California including Burbank, County of Ventura, City of Ventura, and Eastern Municipal Water District. With a deep bench of resources, availability and experience with similar projects, and our knowledge gained from working with the District for more than 30 years, we are committed to providing the District with cost-effective solutions to meet your project goals and objectives.

Brief profiles of our project team members are on the following pages. Resumes are included in Appendix A.

A Highly-Qualified Team You Trust that has an In-Depth Understanding of The District’s Existing Water Storage Tanks and Design Criteria Structural
Jeff Tarbell, PE
Civil / Piping
Patrick Tran, PE
Electrical / Instrumentation
Erin Hoepfl, PE
Corrosion/Protective Coating
Milt Larsen, PE
Geotechnical
1 Loree Berry, PE
1 Gresham Eckrich, PE, CEG
1 Nick Simon
Survey / Mapping
2 Larry Frager, PE, PLS
Corrosion / Cathodic Protection
3 Richard Yeager Jr., PE
3 Randy Geving, PE
Technical Team
LEGEND Key Personnel 1 Yeh & Associates, Inc. 2 Benner & Carpenter Ventura County Waterworks District No. 8
Principal-In-Charge/Project Manager
Jeff Savard, PE
QA/QC
Peter Symonds, PE, Assoc. DBIA, CDT
Project Engineer
Don Barraza, PE
3 RF Yeager Engineering, Inc.
49 KENNEDY/JENKS CONSUL TANTS, INC.
23 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
7 | Assigned Personnel
Jeff Savard, PE Principal-In-Charge/Project Manager
% Availability
20 Years of Experience
35 Education
BS, Civil Engineering,
California Polytechnic
State University, San
Luis Obispo, 1990
Registration
Professional Civil
Engineer - CA (51156)
Jeff currently serves as Vice President of the firm and Client Service Manager for the Ventura County office. He understands the importance of team competence and collaboration with interested parties. He has been involved approximately around two dozen tank and reservoir projects, including notable contributions to projects like the District’s Lower McCoy Tank, Recycled Water Tank, and Aerator Tank Replacement. He brings substantial experience to ensure successful project outcomes.

Relevant Experience
• Backwash Storage Tank, United Water Conservation District, CA | Project Manager
• 430 Zone Reservoir, City of San Buenaventura, CA | Project Engineer • 1 MG Reservoir, Ventura County Waterworks District No. 1, CA | Project Manager Current and Projected Workload
• Project Manager - Zone 571 Pump Station - Ventura County Waterworks District No. 1, CA
• Principal-In-Charge - Vic Trace Reservoir Replacement, City of Santa Barbara, CA • Project Manager - Lindero Pump Station Rehabilitation, Calleguas Municipal Water District, CA
• Project Manager - Lomas Vista Pump Station, City of Ventura, CA • Principal-In-Charge - Mechanical Shop Building, Santa Clarita Valley Water Agency, CA
• Principal-In-Charge - Pump Station and Forebay, City of Beverly Hills, CA Don Barraza, PE Project Engineer
% Availability
30 Years of Experience
39 Education
BS, Civil Engineering,
University of Wyoming,
1986
Registration
Professional Civil
Engineer - CA (45483)
Don, a senior engineer with over 39 years of experience, has worked on 18+ condition assessments, designed 70+ concrete tanks and 70+ steel reservoirs, 17 pump stations, and 30+ water treatment plants. He has reviewed over a dozen water treatment plant projects and served as PM for the Seismic Evaluation of the Waterworks Storage Tank System and the Stow No. 1 S tank. Don is very familiar with the District’s water reservoirs.

Relevant Experience
• 1.0 MG Fiege Canyon Water Storage Tank Retrofit/Replacement, City of Calistoga, CA | Project Manager/Principal-In-Charge
• 0.85 MG East Dunne Hillside Water Reservoir and Pump Station Upgrades, City of Morgan Hill, CA | QA/QC
• 4.5 MG Water Reservoir, McKinleyville Community Services District, CA | Structural Designer
Current and Projected Workload
• Project Engineer - Cabrillo Pump Station and Forebay, City of Beverly Hills, CA • Project Manager - Reservoir Structural and Seismic Evaluation, City of Camarillo, CA
• Project Manager - Vic Trace Reservoir Replacement - City of Santa Barbara, CA • Project Engineer - Engineering Services During Construction, Various Clients, CA 50 KENNEDY/JENKS CONSUL TANTS, INC.
24 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
7 | Assigned Personnel
Peter Symonds, PE, Assoc. DBIA, CDT QA/QC
% Availability
25%
Years of Experience
20 Education
BS, Civil Engineering,
University of California,
Berkeley, 2003
MS, Civil Engineering,
University of California,
Davis, 2004
Registration
Professional Civil
Engineer - CA (45483)
Peter is a civil engineer whose primary area of experience is structural analysis and design of buildings and tank structures in earthquake regions. His expertise includes analyzing, designing, and rehabilitating water-containing structures subjected to static and hydrodynamic loads, notably from earthquakes. He has performed detailed modeling of complicated structures for tanks and buildings, including nonlinear time- history analysis of structures under earthquake loading.

Relevant Experience
• 0.85 MG East Dunne Hillside Water Reservoir and Pump Station Upgrades, City of Morgan Hill, CA | Structural Designer
• Floriston Spring Filtration, Floriston Property Owners Association, CA | Structural Designer
• Walnut 2 West 2.0 MG Tank Rehabilitation and Recoating, City of Simi Valley, CA | Structural Designer
Current and Projected Workload
• Structural Lead - POA Tank, Floriston Property Owner's Association, CA • Structural Lead - S. Plant DAFT Replacement, King County Department of Natural Resources, WA
• Condition Assessment - Aeration Basin, City of Santa Rosa, CA • Structural Lead - FEPS, Silicon Valley Clean Water, CA • Structural Lead - Meadows Pipeline, Carmel Area Wastewater Distict, CA • Structural Lead - Alemany Box Sewer, San Francisco Public Utilities District, CA Jeff Tarbell, PE Structural
% Availability
25 Years of Experience
18 Education
BS, Architectural
Engineering, California
Polytechnic State
University, San Luis
Obispo, 2006
Registration
Professional Engineer,
Structural - CA (6340)
Jeff is a senior structural engineer with over 18 years of experience designing various structures and facilities throughout Southern California. His extensive background includes managing complex projects that require rigorous adherence to safety and environmental standards, making him well-equipped to support this project.

Relevant Experience
• Elevated Tank Replacement Study, City of Davis, CA | Structural Engineer • Disinfection Modernization Design, County of Ventura, CA | Structural Engineer • Eastside to Westside Interconnection Waterline, City of San Buenaventura, CA | Structural Engineer
Current and Projected Workload
• Structural Engineer - 209th Ave. Pump Station, City of Beaverton, OR • Structural Engineer - Facility-Wide Water System Improvements, City of San Jose, CA
• Structural Engineer - Wells 20-22, 25, 27, Orange County Water District, CA • Quality Control - Final Effluent Pump Station Improvements, Silicon Valley Clean Water, CA
51 KENNEDY/JENKS CONSUL TANTS, INC.
25 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
7 | Assigned Personnel
Patrick Tran, PE Civil/Piping
% Availability
25 Years of Experience
7 Education
BS, Civil and
Environmental
Engineering, University
of California, Los
Angeles
Registration
Professional Civil
Engineer - CA (92907)
Patrick has seven years of experience in the civil engineering field. His responsibilities include developing designs and preparing plans and specifications for wastewater and groundwater treatment plants, sanitary, potable, and reclaimed water pipelines, reservoirs, mass grading, and wetland restoration projects.

Relevant Experience
• La Vista Tank and Booster Pump Station Design, Carmichael Water District, CA | Civil Engineer
• Backwash Storage Tank, United Water Conservation District, CA | Civil Engineer • 0.85 MG East Dunne Hillside Water Reservoir and Pump Station Upgrades, City of Morgan Hill, CA | Civil Engineer
Current and Projected Workload
• Civil Engineer - PFAS Treatment Systems Wells 25 & 27, Orange County Water District, CA
• Civil Engineer - Groundwater Injection Wells, City of Santa Monica, CA • Civil Engineer - E. Dunne Hillside Reservoir, City of Morgan Hill, CA • Civil Engineer - Evaporative Cooler Building Up-grade, Inland Empire Utilities District, CA
• Civil Engineer - Well 205 Perchiorate Treatment, Santa Clarita Valley Water District, CA
• Civil Engineer - La Cienega Wells, City of Beverly Hills, CA • Civil Engineer - Switchgear Replacement, Monterey One Water, CA • Civil Engineer - Well 99, Ventura Waterworks District 1, CA Erin Hoepfl, PE Electrical/Instrumentation
% Availability
25 Years of Experience
18 Education
BS, Electrical
Engineering, Clemson
University, 2009
Registration
Professional Engineer -
MD (6340)
Erin, an electrical engineer, has extensive experience in engineering analysis and design. She has supported multi-disciplinary teams from concept to final design, specializing in project development, engineering design packages, and power system analysis for nuclear plants, including AC/DC loading and protection calculations.

Relevant Experience
• Backwash Storage Tank, United Water Conservation District, CA | Electrical Engineer
• 1 MG Welded Steel Tank, City of Newman, CA | Electrical Engineer • Floriston Spring Filtration Project, Floriston Property Owners Assoc., CA | Electrical Engineer
Current and Projected Workload
• Electrical Engineer - Carsten Reservoir No. 3, City of Banks, OR • Electrical Engineer - Wastewater System Improvements, City of Estacada, OR • Electrical Engineer - Toledo ASB Foam Control, Confidential Client, OR • Electrical Engineer - 724 Zone Pump Station No. 2, Alderwood Water and Wastewater District, WA
• Electrical Engineer - Floriston Spring Filtration, Floriston Property Owners Association, CA
52 KENNEDY/JENKS CONSUL TANTS, INC.
26 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
7 | Assigned Personnel
Milt Larsen, PE Corrosion/Protective Coating
% Availability
20 Years of Experience
50 Education
BS, Civil Engineering,
Kansas State
University, 1973
MS, Civil Engineering,
Kansas State
University, 1975
Registration
Professional Civil
Engineer - WA (18985)
Milt is an experienced project manager and corrosion engineer. He has led numerous water quality and corrosion control projects, including designing protective coatings and cathodic protection systems for various water treatment and distribution facilities.

Relevant Experience
• Backwash Storage Tank, United Water Conservation District, CA | Project Engineer
• La Vista Tank and Booster Pump Station Design, Carmichael Water District, CA | Civil/Corrosion Engineer
• Process Water and Fire Water Welded Steel Tanks, City of San Jose, Regional Wastewater Treatment Plant, CA | Civil/Corrosion Engineer Current and Projected Workload
• Project Manager - Lakewood County Place PFAS Treatment ESDC, Lakewood Water District, WA
• Project Manager - Covington 222 Pl. Corrosion Contral Facility Rehab, Covington Water District, WA
• Project Manager - Lakewood On-Call, Lakewood Water District, WA • Project Manager - Brown & Caldwell-Cascade Groundwater Alliance, WA • Project Manager - QC - Various Projects, WA
Loree Berry, PE Geotechnical
Years of Experience
22 Education
BS, Geological
Engineering,
University of
Wisconsin,
Madison, 2001
Registration
Professional Civil
Engineer - CA (73221)
Loree has more than 22 years of professional engineering experience with 20 of those living in Ventura and working along the Southern California coast providing geotechnical engineering and geology services for a wide range of private and public agency clients, utility districts, transportation departments, special geologic hazard districts, and construction services. She is familiar with the geology and geotechnical challenges and is highly experienced in evaluating subsurface conditions to develop design recommendations for water treatment, storage, and delivery.

Relevant Experience
• AG 3 Tank Replacement and Site Improvements, Camrosa Water District, CA | Project Manager
• Tuolumne Meadows Tank and Pipeline Project, Yosemite-Tuolumne Water District, CA | Project Manager
• Signal Tank Zone Improvements, Casitas Municipal Water District, CA | Project Manager
53 KENNEDY/JENKS CONSUL TANTS, INC.
27 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
7 | Assigned Personnel
Gresham D. Eckrich, PE, CEG Geotechnical
Years of Experience
19 Education
Engineering, University
of California, Berkeley,
2007
BS, Geological
Sciences, University of
Michigan - Ann Arbor,
2003
Registration
Professional Civil
Engineer - CA (75208)
Certified Engineering
Geologist - CA (2601)
Gresh has more than 19 years of experience in engineering geology and geotechnical engineering. He has specialized experience in managing geotechnical services for bridge design and construction projects. His experience with bridge and transportation projects has included evaluations for slope stability, earthquake hazards, liquefaction, seepage, scour, seismic response, and mitigation of those hazards for local, state and federal projects. He has worked closely with San Luis Obispo County, FHWA, Caltrans Local Assistance and agencies throughout California for various projects involving federal funding through the Highway Bridge Program, Emergency Response Funds and FEMA.

Relevant Experience
• Shandon Dual Water Tank Project, San Luis Obispo County, CA | Geologist • Main West Tank Replacement, City of Paso Robles, CA | Geologist • Alamo Tank Replacement, Golden State Water Company, CA | Geologist Nick Simon Geotechnical
Years of Experience
28 Education
BS Geological
Sciences, University
of California, Santa
Barbara, CA,
1997
Registration
N/A
Nick has extensive experience in geotechnical and environmental field work, laboratory testing, and report writing. His duties have included geotechnical, geological, and environmental exploration, drilling/coring and sampling, boring log creation (using Gint), inclinometer installation/monitoring and interpretation, construction monitoring, and maintenance of landslide instrumentation and dewatering facilities, field percolation testing, compaction testing, implementation of environmental soil sampling plans.

Relevant Experience
• 2023 CIP Projects, Ventura River Water District, CA | Geologist • Signal Tank Zone Improvements, Casitas Municipal Water District, CA | Geologist • Ventura Water Reclamation Facility Membrane Bioreactor and Ultraviolet Disinfection, CA | Geologist
54 KENNEDY/JENKS CONSUL TANTS, INC.
28 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
7 | Assigned Personnel
Larry Frager, PE, PLS Survey/Mapping
Years of Experience
36 Education
B.S., Civil Engineering,
South Dakota School of
Mines & Technology
Registration
Professional Engineer,
Civil - CA (44725)
Larry is responsible for project management of both civil engineering and land surveying projects. He also supervises and schedules the work for both the field staff and technical office staff. Larry is both a licensed civil engineer and land surveyor in the State of California with 36 years of experience, the last 31 years at Benner and Carpenter, Inc.

Relevant Experience
• Annual Professional Services - Land Surveying and Civil Engineer, County of Ventura, CA | Project Manager
• Task Order Agreement for On-Call Professional Services - Land Surveying, City of Ventura, CA | Project Manager
• Various Topographic Survey Projects, City of Simi Valley, CA | Project Manager Richard Yeager JR, PE Corrosion/Cathodic Protection
Years of Experience
28 Education
BS, Civil Engineering,
California Polytechnic
State University, 1997
Registration
Professional Civil
Engineer - CA (6321)
Richard has extensive experience in water and wastewater corrosion control and cathodic protection system designs, corrosivity assessments, pipe and coating materials of construction, and inspection and monitoring of installed piping systems.

He has also provided construction inspection services for projects that have included pipelines, water reservoirs, treatments plants, and roadways.

Relevant Experience
• Hauck Mesa Reservoir and Flow Control Facility, San Diego County Water Authority, CA | Corrosion Engineer
• San Diego 12 Flow and Alvarado Hydroelectric Facility, San Diego County Water Authority, CA | Corrosion Engineer
• Pipeline 3 Reline Sweetwater to Lower Otay, San Diego County Water Authority, CA | Corrosion Engineer
Randy Geving, PE Corrosion/Cathodic Protection
Years of Experience
38 Education
B.S., Metallurgical
Engineering, California
Polytechnic State
University, San Luis
Obispo, 1987
Registration
Professional Corrosion
Engineer - CA (CR-
1060)
Randy has over thirty eight years of corrosion engineering experience in the water, wastewater, and oil & gas industries. He has extensive experience in the design and installation of cathodic protection systems, condition assessment of metallic pipelines and concrete reinforced structures, metallic component failure analysis, and metallurgical materials selection for hydro processing and water/wastewater facilities.

Relevant Experience
• 31 Potable Water Pipelines, City of San Diego, CA | Corrosion Engineer • Morro Hills No. 2 Reservoir, City of Oceanside, CA | Corrosion Engineer • 18 Inch Steel Force Main, Jurupa Community Services District, CA | Corrosion Engineer
55 KENNEDY/JENKS CONSUL TANTS, INC.
29 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
8 Schedule
The KJ Team Has the Availability and Capacity to Move Quickly Our team understands the importance of the project and project schedule drivers. We have evaluated everyone’s current and anticipated workload and in all cases, each person has more than sufficient capacity than what is anticipated to accomplish the work. Our team is flexible and will adapt to changing project conditions and constraints.

Stow Tank #1 Replacement Start Finish 2025 2026
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Notice to Proceed 8/5/25 8/5/25
A - PROJECT MANAGEMENT (12 Months) 8/5/25 8/5/26
Task 1.1 - Project Initiation 8/5/25 8/20/25
Kick Off Meeting 8/20/25 8/20/25
Task 1.2 - Project Monitoring/Tracking 8/5/25 8/5/26
Task 1.3 - Bi-Weekly Meetings 9/5/25 7/5/26
Task 1.4 - QA/QC 8/5/25 8/5/26
C&CR 10/20/25 10/20/25
B - PRE-DESIGN SERVICES (3 Months) 8/5/25 11/5/25
Task 2.1 - Data Collection/Review 8/5/25 9/5/25
Task 2.2 - Site Visit 8/28/25 8/28/25
Task 2.3 - Survey 8/20/25 10/5/25
Task 2.4 - Geotechnical Investigation 8/20/25 11/5/25
C - DESIGN SERVICES (8 Months) 10/5/25 6/5/26
Task 3.1 - PDR/30% 10/5/25 11/5/25
District Review 11/5/25 11/20/25
Task 3.2 - 60% 11/5/25 1/5/26
District Review 1/5/26 1/20/26
Task 3.3 - 90% 1/5/26 4/5/26
District Review 4/5/26 4/20/26
Task 3.4 - 100% 4/5/26 6/5/26
D - BID SUPPORT SERVICES (12 Months) 6/5/26 8/5/26
Advertise Bids 6/5/26 6/5/26
Task 4.1 - Pre-Bid Meeting 6/20/26 6/20/26
Task 4.2 - Addenda 6/20/26 7/5/26
Receive Bids 7/20/26 7/20/26
Task 4.3 - Conformed Documents 7/20/26 8/5/26
LEGEND
One Day
Multiple Days
56 KENNEDY/JENKS CONSUL TANTS, INC.
30 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
9 Program Monitoring
Quality Management Plan (QMP) and Quality Assurance and Quality Control (QA/QC) have been integrated into KJ’s project management system since its inception. KJ uses the Project QMP to provide the team with the background and organizational structure that will be the foundation for how Jeff will coordinate the KJ team.

Using the communication protocols, project controls, and quality assurance/management procedures, Jeff will guide the team through each execution phase to efficient completion, meeting schedule and budget targets.

Our QA/QC process includes the following key elements:
• Independent Review. Our Quality Review Team members are typically not directly involved in the project design and bring a “fresh set of eyes” to the project.
• Strong Organization. This includes experienced QA/QC Manager Peter Symonds, who will work with Jeff to develop a project-specific QMP . This plan will ensure that appropriately qualified staff are assigned to the review tasks, monitoring compliance is performed, and periodic work audits are completed. • Thorough Documentation. The QMP will define procedures, compliance methods, lines of communication, responsibility, and methods for checking work. • Strict Compliance Monitoring. The QA/QC Manager will notify the Project Manager and appropriate KJ team members of any detected non-compliance with the QMP .

KJ's QC Plan: Unwavering Quality Every Step of Your Project's Journey

PRELIMINARY WORK PLAN
Upfront Planning and
Communication
• Establish client’s needs
• Develop QC Plan
• Establish Concept & Criteria
Review and Submittal Review
milestones

PROJECT INITIATION
REVIEW
Consensus on
Project Approach
• KJ Senior
Management review
project approach and
scope

CONCEPT &

CRITERIA REVIEW
Leveraging
Knowledge
of Firm-wide
Resources
• Confirm with
senior staff, not
associated with
the project

CALCULATIONS
CHECK
Conducting
Checks and
Balances
• Review scientific
and engineering
calculations

MILESTONE

REVIEWS
Check All Major
Submittals
• Reports
• Design
• Technical
Memos
REVIEW

DOCUMENTATION
Online System
Captures Review
Process
• Work product
review, final
approval, and
sign-off dates

PROJECT SETUP
Update and Expand Preliminary
Work Plan
• Set up project in electronic online
application
• Outline scope, budget, schedule,
and QC plan
• Define accounting administrative,
and health and safety procudures

KICKOFF MEETING
Team Alignment with Project
Goals and Objectives
• Discuss and address issues
• Establish team understanding
• Plan follow up meeting
Executing the QC Plan
Establishing the QC Plan

SUCCESSFUL

PROJECT

COMPLETION
KJ's quality management plan will be established as part of the project management plan, providing continuous quality control throughout the life of the project.
57 KENNEDY/JENKS CONSUL TANTS, INC.
31 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
10 District Resources
To achieve the objectives of the Stow Tank No. 1 Replacement project, the District will need to provide several services and staff resources to supplement the team's activities. Here is a detailed description:

District Services
• Data Provision: The District must provide all available records including existing plans, studies, and inspection reports. This data is crucial for the team to perform accurate assessments and develop a comprehensive design.
• Site Access: The District must ensure that the team has access to the project site for data collection, site visits, surveys, and geotechnical investigations.
• Regulatory Compliance Support: The District will assist in navigating regulatory requirements, including prevailing wage laws, DIR registration, and insurance requirements. This support will help ensure that the project complies with all legal and regulatory standards.

Staff Resources
• Project Coordination: The District will provide staff to coordinate with the team on project management tasks, including attending progress meetings, reviewing monthly progress reports, and providing feedback on project deliverables.
• Technical Review: District staff with technical expertise will review the team's designs, calculations, and specifications to ensure they meet the project's requirements and standards. • Quality Assurance: District staff will participate in quality assurance activities, including reviewing QC/ QA procedures and ensuring that all deliverables meet the highest quality standards. • Interested Parties Engagement: District staff will engage with other City interested parties to represent the project's interests and ensure that all interested parties input is considered in the design and implementation process.

By providing these services and staff resources, the District will effectively supplement the team's activities, ensuring the project objectives are met, and the new Stow Tank No. 1 is successfully designed and constructed.
58 KENNEDY/JENKS CONSUL TANTS, INC.
32 SIMI VALLEY VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
11 Subcontractors
KJ has chosen to team with the following subconsultants who will work closely with us to successfully complete the District’s Stow Tank 1 Replacement Project. List of their assigned staff, and their qualifications are located in section 7.

Yeh and Associates, Inc. Geotechnical
Yeh and Associates is a local, full-service firm specializing in geotechnical engineering, engineering geology, and construction management. Their extensive professional engineering experience includes traditional investigation services, geologic hazard evaluation, and geotechnical evaluations. Yeh and KJ have recent and relevant project experience working together with Ventura County Waterworks for Disinfection Equipment Upgrades at the Ventura County Water Reclamation Facility in Moorpark, CA, and for the final design of Box Canyon Pump Stations 2 and 3 Improvements in Simi Valley, CA.

Benner and Carpenter Survey/Mapping
Benner and Carpenter, Inc., a Delane Engineering Company (Benner and Carpenter), is a trusted local firm that has been providing high-quality surveying services for 50 years to a diverse range of clients, including the City of Simi Valley. As a certified small business, Benner and Carpenter serves Santa Barbara, Ventura, and North Los Angeles counties, utilizing the latest advancements in design and land surveying technologies. Benner and Carpenter, field crews are equipped with office-ready cargo vans and robotic electronic measuring devices, including GPS capabilities. All crews are capable of complete data collection and computations, as well as the ability to print cut sheets at the jobsite. Since 1990, Benner and Carpenter has s uccessfully partnered with KJ on more than 90 projects, showcasing a long-standing commitment to excellence and collaboration.

RF Yeager Engineering, Inc. Corrosion/Cathodic Protection RF Yeager has extensive experience in Corrosivity Assessments, Corrosion Control/ Cathodic Protection Designs, Corrosion Control/Cathodic Protection Inspections, Corrosion Condition Assessments, and Engineering Support Services. They are highly qualified in areas of corrosion control for water and wastewater systems, pipelines, reservoirs, treatment plants, pump stations, and pressure reducing stations. All work is conducted under qualified and certified personnel with over 60 years of combined experience and service in the corrosion engineering industry. 59 KENNEDY/JENKS CONSUL TANTS, INC.
33 SIMI VALLEY VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
11 | Subcontractors
RFP NO. PW 25-01

SUBMIT WITH PROPOSAL
14 LIST OF SUBCONTRACTORS AND OFF-JOB FABRICATORS
Contractor's Name _________________________________________________________ Listing must comply with the provisions of Public Contract Code § 4104.

Name of
Subcontractor
or Off-Job Fabricator
PWC
Number
CSLB
Number
Address Items of Work
If more space is needed, attach additional sheets.

Public Contract Code § 4104 provides that bidders must list:
(a)(1) The name, the location of the place of business, and the California contractor license number of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the State of California who, under subcontract to the prime contractor, speciallyfabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one -half of 1 percent of the prime contractor's total bid or, in the case of bids or offers for the construction of streets or highways, including bridges, in excess of one-half of 1 percent of the prime contractor's total bid or ten thousand dollars ($10,000), whichever is greater.

Per Public Contract Code §4104, Contractor’s bidding on public projects are required to list above California contractor license numbers and DIR registration numbers for all subcontractor’s performing work in excess of one-half of one-percent of the contract’s value.

Kennedy/Jenks Consultants, Inc.

RF Yeager Engineering, Inc. 9562 Winter Gardens
Blvd., Ste D151, Lakeside,
CA 92040
Corrosion/Cathodic Protection
1000030005 C3758820
632 E. Thompson Blvd,
Ventura, CA 93001 GeotechnicalYeh and Associates, Inc.
1000020466 2004009396
Benner and Carpenter, Inc. 10000021843 7996
400 W. Ventura Blvd.,
#265, Camarillo, CA 93010 Survey/Mapping
60 KENNEDY/JENKS CONSUL TANTS, INC.
34 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
12 Statement of Proposer's Qualifications and References Extensive and Similar Tank Experience
KJ provides a full range of water distribution and storage planning and design capabilities. Our reservoir design experience includes bolted steel tanks (both coated and glass-fused), welded steel tanks, and concrete reservoirs. We provide the gamut of services for reservoir design projects, including: siting evaluations and studies, alternatives analyses for construction materials and methods, distribution system evaluations, water age analysis, mixing systems, seismic retrofitting and resilience, telemetry and controls, regulatory agency, and coordination. KJ has successfully completed more than 100 water storage tanks over the past ten years. In the past five years, our engineers have participated in the design of 45 tank projects.

The projects summarized in this section highlight KJ’s relevant project experience and represent a fraction of our team’s full experiences. These projects demonstrate our team’s ability to perform your scope of work.

Featured projects within the last three years are provided on the following pages.

Client Project Size
Ventura County Water Works District #1 Recycled Water Tank 1.5 MG City of Fillmore Reservoir No. 3 3.0 MG
Port Hueneme Water Agency Treated Water Storage Tank 0.6 MG City of Simi Valley Lower McCoy Reservoir 1.0 MG
City of Simi Valley Recycled Water Tank 1.0 MG
City of Simi Valley Aerator Tank 0.5 MG
City of San Buenaventura View Park Tank 0.25 MG
City of San Buenaventura 430 Pressure Zone Reservoir 2 x 2.0 MG Relevant Welded Steel Tank Experience in Ventura County Relevant Welded Steel Tank Experience in Southern California Client Project Size
City of Lompoc 4 MG Reservoir 4.0 MG
Castaic Lake Water Agency Recycled Water Reservoir No. 1 1.0 MG Castaic Lake Water Agency Plant Water Tank 1.0 MG
City of Westmoreland Filtered Water Tank 0.8 MG
Rancho California Water District El Chimisal Reservoir No. 2 6.6 MG Eastern Municipal Water District Longfellow Recycled Water Tank 5.0 MG Eastern Municipal Water District Daily II Reservoir 2.1 MG Other Relevant California Reservoir Experience
Client Project Size
City of Glendale Chevy Chase 968 Reservoir 15 MG
San Francisco Public Utilities Commission Harry Tracy Water Treatment Plant Clearwell 15 MG Castaic Lake Water Agency Rio Vista Water Treatment Reservoirs 2 x 15 MG Kern County Water Agency Henry Garnett Water Purification Plant Reservoirs 2 x 3.0 MG Burbank Water & Power Reservoir No. 1 9.5 MG
City of Roseville Northeast Highlands Reservoir Replacement 7.25 MG City of South Pasadena Garfield Reservoir Replacement 6.5 MG City of South Monica Arcadia WTP Reservoir Seismic Damage Evaluation 5.0 MG 61 KENNEDY/JENKS CONSUL TANTS, INC.
35 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
12 | Statement of Proposer's Qualifications and References Client Reference
Michael Ta, PE | Associate
Engineer
4245 Zanker Road
San Jose, CA 95134
(408) 635-4019
Relevant Team Members
Don Barraza, Milt Larsen
Fee
$140k (Design)
Project Dates
2022—Ongoing
KJ provided design services for the 1W Process Water, 4W Fire Water and Air Gap water storage tanks, including the pump station building, electrical enclosures, canopy, and miscellaneous foundations.

As part of the City’s facility’s wide water system improvements for the regional wastewater treatment plant, a new fire water and air gap drinking water storage reservoir and a process water tank were identified as needed. KJ provided survey, geotechnical, and design engineering services for the two new water storage tanks including design of the mat slab concrete foundations, welded steel tank design including tank appurtenances and piping connections, NSF61/600 protective coating systems specifications, and new tank appurtenances including manways, flush type cleanouts, venting, access hatches, exterior and interior ladders with fall protection systems, level measurement and indications, and guardrails. Engineering services included site civil layout, structural, mechanical, electrical, instrumentation, and controls, and engineering services during construction.

Key project elements included:
• Reservoirs: 51,000-gallon and 73,000-gallon welded steel water storage tanks.
• Pipelines: New ductile iron flexible extension tank inlet, outlet, overflow, and drain pipeline connections.
• Pump Station: Planning and layout of the reservoir site to accommodate a new dual-purpose pump station with distribution system and fire water pumps.
• Site Drainage: Grading and drainage improvements for the reservoir pads and surrounding pavement.

0.051 MG Process Water and 0.073 MG Fire Water Welded Steel Tanks | City of San Jose, CA 62 KENNEDY/JENKS CONSUL TANTS, INC.
36 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
12 | Statement of Proposer's Qualifications and References Client Reference
David Gittleson, PE |
Associate Engineer
17575 Peak Ave.

Morgan Hill, CA
(408) 310-4642l
Relevant Team Members
Don Barraza, Peter
Symonds, Patrick Tran,
Fee
$525k (Design)
Project Dates
2023—Ongoing
KJ designed a 0.85 MG welded steel water reservoir in Morgan Hill to eliminate pumping to the highest elevation pressure zone, permit off-peak pumping, and satisfy fire flow and emergency water demands. The site required extensive grading for a new access road and tank pad on a hillside, involving soil nail, shotcrete, and mechanically stabilized earth retaining wall systems. The project scope included site layout, grading, drainage, stormwater management, yard piping, landscaping, structural design for the tank and site structures, cathodic protection, electrical and I&C, survey, geotechnical work, and CEQA documentation. The tank's location near an affluent residential area raised community concerns about its visual impact.

Key project elements included:
• Reservoir: 850,000-gallon welded steel water storage tank. • Pipelines: 700 feet of inlet and outlet connecting pipe. • Access Road: 600 feet of access road to the reservoir pad, including roadway retaining walls and drainage elements.
• Retaining Structures: Earth retaining structures, including soil nails and shotcrete, mechanically stabilized earth, and concrete gravity retaining walls to heights of 26'-0".
• Pump Station: Planning and layout the reservoir site to accommodate a future pump station. Replacement of pumps at the existing East Dunne Pump Station.
• Site Drainage: Grading and drainage improvements for the reservoir pad, access roadway, and containment basin.
• Landscaping: Landscaping and irrigation screen the reservoir, permanently cut slopes, and reconstruct construction-related disturbed areas.

0.85 MG East Dunne Hillside Water Reservoir and Pump Station Upgrades | City of Morgan Hill, CA 1 MARCH 2016
Morgan Hill East Dunne Hillside Reservoir -
City of Morgan Hill / Kennedy Jenks
PAge 7 of 7

EXISTING TREE STAND
COAST LIVE OAK / Quercus lobata, TYP
VALLEY OAK / Quercus agrifolia, TYP
HOLLYLEAF CHERRY / Prunus ilicifolia, TYP
TOYON / Heteromeles arbutifolia, TYP
Hydroseed mix of native
grasses and wildflowers to be
planted where soil is disturbed
by construction
Schematic Planting Plan
15’ 30’ 60’
N
TANK
PUMP
HOUSE

ACCESS ROAD
63 KENNEDY/JENKS CONSUL TANTS, INC.
37 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
12 | Statement of Proposer's Qualifications and References Client Reference
Jolynn Becker
120 South Banks
Banks, OR 97106
San Jose, CA 95134
(503) 324-5112
Relevant Team Members
Don Barraza, Erin Hoepfl,
Milt Larsen
Fee
$988k (Design)
Project Dates
2024—2025
The City’s Water System Master Plan identified the need for a new reservoir to serve additional growth. Sited at the Carsten Hill site, KJ designed the reservoir improvements, a new 1 MG Reservoir (#3), and conducted a Seismic Risk Evaluation (required by Oregon Health Authority for public water systems to determine weak elements of the water system). Additional design elements include: electrical and instrumentation and control (I&C) improvements, including dedicated electrical service, new CMU block control building to house electrical service meter and power distribution to site instruments, PLC, and operation interface system, new security improvements, and future space to allow installation of additional disinfection and reservoir mixing equipment. This project also included a new 2,100-foot well transmission pipeline to connect the reservoir site to the existing Behrman well site, which will be able to accommodate future Aquifer Storage and Recovery (ASR) and additional wells, new site security systems, including a motorized gate with card-lock access, security cameras, and an intrusion alert system.

Key project elements included:
• Seismic/Structural: A seismic assessment was conducted as required by the Oregon Health Authority to identify and address vulnerabilities in the water system.
• Well Transmission Line Installation: The project includes a new CMU control building with dedicated electrical service, PLC, and operational interface systems to modernize site operations.
• New Reservoir: 1-million-gallon Carsten Reservoir #3 was designed to support future growth in the City of Banks and improve water system capacity.
• Electrical I&C: The project includes a new CMU control building with dedicated electrical service, PLC, and operational interface systems to modernize site operations.
1 MG Carsten Reservoir #3 Design | City of Banks, OR
64 KENNEDY/JENKS CONSUL TANTS, INC.
38 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
12 | Statement of Proposer's Qualifications and References Client Reference
Steve Nugent | General
Manager
7837 Fair Oaks Blvd.

Carmichael, CA 95608
(916) 483-2452
Relevant Team Members
Milt Larson, Peter Symonds,
Patrick Tran
Fee
$1.4M (Design)
Project Dates
2019—2023
The La Vista Storage Tank and Booster Pump Station (BPS) have been vital facilities in the Carmichael Water District’s (District’s) water distribution system for nearly 50 years. KJ assisted the District with alternative development and evaluation to achieve an up-to-date facility with optimized features. Based on the District’s long-term goals forwater reliability, the decision was made to replace an existing 3.0 MG water storage tank that had reached its useful life with a new 3.0 MG tank. The project also included the replacement of the existing BPS with a new 4,500 gpm BPS, a new disinfection chemical feed system, new backup power, and well rehabilitation to provide up to 2,000 gpm with a new well pump and a motor.

KJ provided a complete service package for this project, including preliminary design, final design, and bidding services. This work included establishing a Basis of Design (BOD) to review the tank and BPS capacity and performing a detailed analysis of storage and pumping needs. The existing La Vista production well was evaluated to determine its remaining useful life and whether the increase of the well capacity is feasible and cost-effective. A part of this project is the addition of a new transmission main to improve the distribution of this critical water supply and fire protection facility. One of the project challenges was a tight schedule, which required expedited design, bidding, and construction to avoid a five-year moratorium for excavation on Fair Oaks Boulevard. KJ also supported the District with the following permits: CEQA/NEPA, MND, DDW Water Supply Permit Amendment, County Encroachment Permit, and ROW acquisition. In addition, we are assisting with public support for this project, specifically from the adjacent residents, the fire station, and the community church.

Key project elements included:
• Alternatives: Examined up to four viable alternatives to achieve an updated facility with optimized features.
• Design: Provided preliminary design, final design, and bidding services • Analysis: Establishing a Basis of Design to review the tank and BPS capacity and perform a detailed analysis of storage and pumping needs. • Documentation: Planned development of the Preliminary Design Report and final design documents
La Vista Tank and Booster Pump Station Design | Carmichael Water District, CA 65 KENNEDY/JENKS CONSUL TANTS, INC.
39 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
12 | Statement of Proposer's Qualifications and References Client Reference
Perfecto Millan |
Superintendent of Public
Works
928 Fresno Street
Newman, CA 95360
(209) 678-0351
Relevant Team Members
Milt Larson, Peter Symonds,
Patrick Tran
Fee
$627k (Design)
Project Dates
2016—2022
The City of Newman (City) water supply has been impacted by the new State Cr6 Primary MCL established in June 2014. The City has been monitoring Cr6 levels every quarter in its four (4) existing potable water supply wells. The City has received a Notice of Violation from the State Water Resources Control Board (SWRCB) Division of Drinking Water (DDW). It has taken interim actions to reduce Cr6 in the water supply. Well 8 is the City's largest water source, providing about 45% of the total system capacity, with Cr6 levels fluctuating between 9 and 11 parts per billion, putting the water supply at risk for future Cr6 compliance. Well 5 regularly exceeds the Cr6 primary MCL, averaging 17 parts per billion, and Well 6 has surpassed the Cr6 primary MCL on some of its quarterly samples.

KJ also designed the equipping of the 2,100 gpm well, new 1.5 MG steel water storage tank with space and piping for a future 1.0 MG water steel storage tank, three 1,000 gpm booster pump station with surge anticipator valve for surge control, standby generator, sodium hypochlorite disinfection system, and 2,700 ft. of 16 inch and 1,600 lf of 6 inch and 8 inch transmission/ distribution mains to interconnect with the City's water distribution system. In addition, 15 residents will be connected to the 6 inch and 8 inch water mains with new water services.

The site improvements include an on-site storage pond with stormwater pump station, security fencing and monitoring system, landscaping for screening, chlorine residual monitoring and controls, SCADA system, site grading, and paving.

Key project elements included:
• New Well Development: A new 2,100 gpm well was designed and drilled to access water with Chromium-6 levels below the regulatory maximum, ensuring long-term compliance and water quality.
• Water Storage Expansion: The project includes a new 1.5 MG welded steel tank with provisions for a future 1.0 MG tank to enhance system capacity and operational flexibility.
• Booster Pump and Disinfection Systems: Three 1,000 gpm booster pumps, a surge control valve, and a sodium hypochlorite disinfection system were integrated to improve water delivery and safety.
1 MG Welded Steel Tank | City of Newman, CA
66 KENNEDY/JENKS CONSUL TANTS, INC.
40 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
12 | Statement of Proposer's Qualifications and References RFP NO. PW 25-01

SUBMIT WITH PROPOSAL
12 STATEMENT OF PROPOSER’S QUALIFICATIONS AND REFERENCES The Proposer is required to state the Proposer's financial ability and a general description of similar work performed.

Number of years engaged in providing the work included within the scope of the specifications under the present business name: .

List and describe fully a minimum of five projects performed by your firm within the last three years, which demonstrate your ability to complete the work included within the scope of the specifications and where the Proposer has performed work in providing professional services to design the replacement of water tanks , particularly in Ventura County’s jurisdiction with government agencies similar to the District. Attach additional pages if required. The District reserves the right to contact each of the references listed for additional information regarding your firm's qualifications.

Reference No. 1
Customer Name:

Contact Individual: Phone No.

Address:

Contract Amount: Year:

Description of work done:

Reference No. 2
Customer Name:

Contact Individual: Phone No.

Address:

Contract Amount: Year:

Description of work done:

Reference No. 3
Customer Name:

Contact Individual: Phone No.

Address:

Contract Amount: Year:

Description of work done:
106 Years
David Gittleson
City of Morgan Hill
17575 Peak Ave., Morgan Hill, CA 95037
(408) 310-4642
$525k (Design) 2023 - Ongoing
KJ provided design services for a 0.85 MG welded steel water reservoir in Morgan Hill. Scope of work included site layout, grading and drainage, stormwater, yard piping, landscaping, structural for tank design and site structures, and cathodic protection.

Michael Ta (408) 635-4019
City of San Jose
4245 Zanker Road, San Jose, CA 95134
$140k (Design) 2022 - Ongoing
KJ provided design services for the 1W Process Water and 4W Fire Water and Air Gap water storage tanks, including pump station building, electrical enclosures, canopy, and miscellaneous foundations.

Jolynn Becker (503) 324-5112
City of Banks
120 South Main Street, Banks, OR 97106
$988k (Design) 2024 - 2025
KJ designed the reservoir improvements, a new 1 MG Reservoir (#3), and a Seismic Risk Evaluation. 67 KENNEDY/JENKS CONSUL TANTS, INC.
41 SIMI VALLEY/VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
12 | Statement of Proposer's Qualifications and References RFP NO. PW 25-01

SUBMIT WITH PROPOSAL
13 STATEMENT OF PROPOSER’S QUALIFICATIONS AND REFERENCES (continued)
Reference No. 4
Customer Name:

Contact Individual: Phone No.

Address:

Contract Amount: Year:

Description of work done:

Reference No. 5
Customer Name:

Contact Individual: Phone No.

Address:

Contract Amount: Year:

Description of work done:

Steve Nugent (916) 483-2452
Carmichael Water District
7837 Fair Oaks Blvd., Carmichael, CA 95608
$1.4M (Design) 2019 - 2023
KJ provided a complete service package for this project, including preliminary design, final design, and bidding services. This work included establishing a Basis of Design to review the tank and BPS capacity and performing a detailed analysis of storage and pumping needs.

Perfecto Millan (209) 678-0351
City of Newman
928 Fresno Street, Newman, CA 95360
$627k (Design) 2016 - 2022
Design of a 2,000 gpm well, new 1.5 MG steel water storage tank with space and piping for a future 1.0 MG water storage tank, 2,700 ft of 16 inch and 1,000 lf of 6 inch and 8 inch transmission/distribution mains to interconnect with the City's water distribution system. 68 KENNEDY/JENKS CONSUL TANTS, INC.
42 SIMI VALLEY VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
13 Alternative Proposals
Not applicable
69 KENNEDY/JENKS CONSUL TANTS, INC.
43 SIMI VALLEY VENTURA COUNTY WATERWORKS DISTRICT NO. 8 | STOW TANK 1 REPLACEMENT | 2025
14 Conflict of Interest
Our firm, its principals, and staff members have not engaged, and do not intend to engage, in any business practices that would present a conflict of interest in performing services for the District, prohibited under State and County laws.
70 City of Simi Valley/Ventura County Waterworks District No. 8 Stow Tank No. 1 Replacement
Appendix A  | Resumes
71 Jeffrey Savard, PE
Principal-In-Charge/Project Manager

PROFESSIONAL SUMMARY
Jeff currently serves as Vice President of the firm and Client Service Manager for the Ventura County office. Jeff's experience has been planning and designing potable water, recycled water, and wastewater systems. This experience includes providing project management and engineering duties for concrete reservoirs (both conventional and prestressed), welded and bolted steel tanks, groundwate r production wells, booster pumping stations, pipelines (including ductile iron, polyvinyl chloride, and welded steel), surface water treatment pl ants, groundwater treatment plants using pressure filtration and reverse osmosis, and water recycling facilities.

Jeff has also worked on various public works projects, including the planning, design, construction administration, and resident engineering for treatment plants, pipelines, reservoirs, pump stations, drainage systems, sanitary sewer systems, recycled water systems, potable water systems, and various related projects. In addition, he has participated in groundwater management plans, urban water management plans, and potable and recycled water master plans, plus he has extensive experience in land surveying.

TOTAL YEARS OF

EXPERIENCE
35 EDUCATION
BS, Civil Engineering,
California Polytechnic
State University, San
Luis Obispo, 1990

REGISTRATIONS
Professional Engineer -
Civil - California
(51156)

MEMBERSHIPS /

AFFILIATIONS
Association of Water
Agencies of Ventura
County
Channel Counties Water
Utilities Committee
American Public Works
Association

PROJECT EXPERIENCE
Lower McCoy Water Reservoir, City of Simi Valley, Simi Valley, CA | Principal-In-Charge The project included designing a 1.0 MG welded steel tank, appurtenant piping, a paved access road, a retaining/crib wall, security fencing, electrical and control systems, cathodic protection, an irrigation system, and landscaping.

Aerator Tank Replacement, City of Simi Valley, Simi Valley, CA | Project Manager KJ prepared design documents for replacing the existing tank with a similar one on the same footprint. Since the existing tank was not founded on a concrete foundation, a new foundation for the tank and roof structure was designed and constructed for this project. The aerator tank layout included two rings of steel tank and a third ring of mesh. The roof structure is supported by steel framing extending up adjacent to the steel tank on the interior and concrete foundations beneath the floor shell.
430 Zone Reservoir and Transmission Main Design Project, City of San Buenaventura, Ventura, CA | Project Manager
Project Manager for the preliminary and final design of two miles of 24 inch diameter transmission main and two 2 MG storage reservoirs. Trenchless construction across the 126 Freeway was included—430 Zone Tank Design Evaluation of Alternative Sites for the City of San Buenaventura. The evaluation included comparing four alternative sites based on economic, non-economic, and land acquisition factors.

Viewpark Tank Construction, City of San Buenaventura, Ventura, CA | Project Engineer The project included the replacement of two 80,000-gallon storage tanks with a new 250,000- gallon welded steel tank. Related work included a detailed construction phasing plan, temporary storage facilities, a new access road, and 12 inch diameter pipeline. 72 Jeffrey Savard, PE
Vic Trace Reservoir Replacement, City of Santa Barbara, Santa Barbara, CA | Principal-In- Charge
This project involved comprehensive planning and design for replacing a 70 -year-old, 10 MG water reservoir and future site facilities. Key aspects included collaborative design workshops, hydraulic modeling, funding strategy, water storage, quality enhancement, climate resilience, energy efficiency, seismic vulnerability analysis, and regulatory compliance, ensuring a reliable and sustainable water supply.

Reservoir Replacement Design, City of San Buenaventura, Ventura, CA | Project Manager The project consisted of preparing plans and specifications to replace an existing 9 MG reservoir with a 2.1 MG cast-in-place concrete reservoir. The reservoir comprises two compartments with separate inlet and outlet pipelines, concrete baffle walls, and a precast concrete roof (columns were not required)—design of approximately 1,000 feet of an 18 inch diameter pipeline for the Grant Park Reservoir. The pipeline comprises welded steel, a mortar lining and coating, and a tape wrap.

Saticoy Well No. 3 Water Conditioning Facility, City of San Buenaventura, Ventura, CA | Project Manager
Managed expanding an iron and manganese removal facility from 2,400 to 6,000 gpm and construction a 3,000 gpm well. Design of approximately 1,000 feet of a 16 inch diameter transmission main. The transmission main delivers raw water from the City's Saticoy Well No. 3 to their Saticoy Water Conditioning Facility. The expansion includes new filter vessels, piping, valves, backwash water storage and handling facilities, chlorine gas system, ammonia system, orthophosphate system, and the planning and preliminary design of a future fluoride system.

Seismic Tank System Evaluation, Ventura County Waterworks District No. 8, Simi Valley, CA | Principal-in-Charge
Performed an initial evaluation of the District’s entire potable water storage system and screened and reviewed the storage tanks, identifying those that have the highest potential for impact, both due to criticality and potential for risk. For the critical tanks we provided in depth seismic reviews and condition assessments to get to the key portions of work necessary to ensure a robust and reliable water supply.

Walnut 2 West 2.0 MG Tank Rehabilitation and Recoating, City of Simi Valley, Simi Valley, CA | Project Manager
Prepared plans and technical specifications for structural modifications and recoating of an existing welded steel tank.

Valley Vista Tank and Water Pipeline, City of San Buenaventura, Ventura, CA | Project Manager
Provided construction administration services for the construction of a new one 1 MG welded steel reservoir in the North Ventura Avenue area. The old tanks were removed, and new native vegetation was planted at the old tank site. Also included in the project was replacement of 1,100 feet of 12 inch PVC water main in Bounds Road to connect the reservoir to the water system and construction of a 1,000-foot-long paved access road.

73 Don Barraza, PE
Project Engineer

PROFESSIONAL SUMMARY
Don is a senior engineer with over 39 years of experience as a structural designer, project engineer, project manager, and construction resident engineer. In these roles, he provided services for the planning, design, condition assessment, construction, and sta rt-up of wastewater collection, treatment, and discharge facilities; recycled water facilities; and sizeable civil infrastructure projects.

In his career, he has worked on more than 18 condition assessments, the structural design of over 70 concrete tanks and 70 st eel reservoirs, 17 pump stations, and more than 30 water treatment plants, and has served as a senior -level reviewer for over a dozen water and wastewater treatment plant projects. He also serves as chairman of the AWWA committee on cast -in-place, conventionally reinforced concrete water storage tanks.

TOTAL YEARS OF

EXPERIENCE
39 EDUCATION
BS, Civil Engineering,
University of
Wyoming, 1986

REGISTRATIONS
Professional Engineer -
Civil - California
(45483)
Professional Engineer -
Civil - Washington
(41090)
Professional Engineer -
Civil - Oregon
(75021PE)

MEMBERSHIPS /

AFFILIATIONS
American Society of Civil
Engineers, Member
Structural Engineers
Association of
California, Member
Applied Technology
Council

PROJECT EXPERIENCE

1.0 MG Feige Canyon Water Storage Tank Retrofit/Replacement, City of Calistoga, Calistoga, CA | Project Manager/Principal-In-Charge
Responsible in Charge for the structural and seismic evaluation of the 1966 era 1.0 MG welded steel tank. Evaluation included identifying structural, seismic, and coating deficiencies, repair, strengthening, and replacement alternatives, and determining the remaining life span and costs for repair or replacement of the welded steel tank. The project included conformance with the State of California Department of Public Health requirements for water storage reservoirs.

Following the seismic evaluation, the design of a 1.0 MG welded steel replacement tank. Project received 75% of funding from CalOES, DHS, and FEMA.

0.85 MG East Dunne Hillside Water Reservoir and Pump Station Upgrades, City of Morgan Hill, Morgan Hill, CA | QA/QC
Don is responsible for reviewing the design of a 0.85 MG welded steel water storage tank with site development, including a steep access road with retaining walls. KJ has been providing professional design services required to update the previously completed designs of the East Dunne Booster Pump Station modifications and the East Dunne Hillside Water Reservoir, working closely with City staff. KJ will provide electronic files of design plans in AutoCAD format and one full-sized set of drawings on mylar.

Seismic Tank System Evaluation, Ventura County Waterworks District No. 9, Simi Valley, CA | Project Manager
Condition assessments and seismic evaluations of 43 welded steel tanks were conducted. The project included interior and exterior site visits, geotechnical site assessment, seismic evaluations, identification of deficiencies, and development of rehabilitations and costs. 74 Don Barraza, PE
State of California's
Governor's Office of
Emergency Services
Vic Trace Reservoir Replacement, City of Santa Barbara, Santa Barbara, CA | Project Manager/Structural Designer/Engineer of Record
Reservoir site design for two 5.0 MG prestressed concrete reservoirs. Master planning for 15 acre reservoir site for valve vaults, valve buildings, pump station, communications/IT building, multi-purpose building, materials laydown and storage, park, and solar arrays.

Reservoir Replacement, Sonoma State University, Rohnert Park, CA | Project Engineer Engineering consulting services for replacing two precast concrete 250,000 gallon water storage reservoirs. The project involved preliminary design of a 385,000 gallon welded steel replacement reservoir, which eventually was transitioned into final design and construction administration services for three new ground-level welded steel water storage tanks, water transmission pipeline replacement, and a new standby diesel engine generator for distribution system pumping.

Gypsy Hill and Royce Reservoirs Evaluations and Replacement, North Coast County Water District, Pacifica, CA | Project Manager/Principal-In-Charge/Structural Designer Engineering services for the design of welded steel tanks for the Gypsy Hill and Royce Reservoir. Services provided for project phases included project management, preliminary design, construction documents including engineering and CAD design, corrosion p rotection evaluation, cost estimate, bidding, and initial construction support.

Longfellow Recycled Water Tank and Pipeline, Eastern Municipal Water District, Winchester, CA | Structural Designer
Design of a 5 MG above-ground, welded steel recycled water storage tank and associated facilities. The project also included approximately 4,500 lf of a 30 inch diameter steel (CML&C) inlet/outlet recycled water pipeline in Simpson Road.

0.35 and 0.325 MG Domestic Water Storage Tanks, Sonoma State University, Rohnert Park, CA | Project Manager
Project manager and in charge of the final design and construction administration services for replacing the University's two Pritzker concrete potable water storage tanks, totaling 400,000 gallons in storage capacity, with three new AWWA D100 welded steel water storage tanks.

McCluski Tank Replacement, McKinleyville Community Services District, McKinleyville, CA | Structural Designer
Structural lead for Phase 1 of the water tank replacement project will result in constructing two new 200,000-gal bolted glass-fused-to-steel tanks. The FEMA Hazard Mitigation Grant Program (HMGP) partially funds the project. Phase 1 work, including preliminary surveying, preliminary geotechnical investigations, hazardous materials survey, tank construction alternatives evaluations, preliminary design drawings, environmental resource studies, and estimated construction costs, was recently completed and submitted to the funding agencies for review.

Phase 2 work, including detailed design and construction, is anticipated to begin in early 2025, with construction being complete in summer 2027.

75 Peter Symonds, PE, Assoc DBIA, CDT
QA/QC

PROFESSIONAL SUMMARY
Peter is a civil engineer with a primary area of experience in the structural analysis and design of buildings and tank structures in earthquake-prone regions. His expertise includes analyzing, designing, and rehabilitating water-containing structures subjected to static and hydrodynamic loads, notably from earthquakes. His experience includes steel, wood, concrete masonry, composite building, and non- building structure design for single and multistory buildings. He has performed detailed modeling of complicated structures for tanks and buildings, including nonlinear time-history analysis of structures under earthquake loading. He has studied constitutive modeling of systems, finite element analysis, fracture mechanics, and performance-based design of concrete and steel structural systems. He manages the technical design disciplines that provide design support for large interdisciplinary projects.

TOTAL YEARS OF

EXPERIENCE
20 EDUCATION
BS, Civil Engineering,
University of
California, Berkeley,
2003
MS, Civil Engineering,
University of
California, Davis,
2004

REGISTRATIONS
Professional Engineer -
Civil - California
(70891)
Professional Engineer -
Missouri
(2019013452)
Professional Engineer -
Civil - Oregon
(85661PE)
Professional Engineer -
Civil - South Dakota
(12130)
Professional Engineer -
Civil - Texas (117574)

PROJECT EXPERIENCE

0.85 MG East Dunne Hillside Water Reservoir and Pump Station Upgrades, City of Morgan Hill, Morgan Hill, CA | Structural Designer
Participated in the design of a 0.85 MG welded steel water storage tank with site development, including a steep access road with retaining walls. KJ has been providing professional design services required to update the previously completed designs of the East Dunne Booster Pump Station modifications and the East Dunne Hillside Water Reservoir, working closely with City staff. KJ will provide electronic files of design plans in AutoCAD format and one full -sized set of drawings on mylar.

Walnut 2 West 2.0 MG Tank Rehabilitation and Recoating, City of Simi Valley, Simi Valley, CA | Structural Designer
KJ assisted the District with developing design documents for the rehabilitation and recoating of the Walnut 2 West 2.0 MG Tank. Rehabilitation work included seismic retrofit, recoating, and other maintenance items, including replacing the outlet pipeline connection, adding a cleanout, repairing spiral cracking at the outlet connection, modifying the floor drain, repairing corroded rafters, adding new roof bracing, and caulking/sealing the roof rafters.

Seismic Tank System Evaluation, Ventura County Waterworks District No. 9, Simi Valley, CA | Structural Designer
Condition assessments and seismic evaluation of 43 welded steel tanks. Project included interior and exterior site visits, geotechnical site assessment, seismic evaluations, identification of deficiencies and development of rehabilitations and costs.

Aerator Tank Evaluation, City of Simi Valley, CA | Structural Designer Aerator Tank: KJ evaluated the existing Aerator Tank. The tank receives groundwater from local wells and functions to 1) provide surge buffering for downstream transfer pumps and 2) remove hydrogen sulfide through passive aeration before water delivery for agricultural use. As a byproduct of the aeration, the tank also oxidizes some of the dissolved iron (Fe) and manganese (Mn) that are naturally present in the groundwater. KJ prepared design documents to replace the existing tank in kind on the same footprint. Since the existing tank was not 76 Peter D. Symonds, PE, Assoc DBIA, CDT
Professional Engineer -
Civil - Nevada
(021382)
Professional Engineer -
Civil - Washington
(44457)

CERTIFICATIONS
Construction Documents
Technologist,
Construction
Specifications Institute
Design-Build Professional,
Design-Build Institute
of America

MEMBERSHIPS /

AFFILIATIONS
Structural Engineers
Association of
Northern California,
Member
founded on a concrete foundation, a new foundation for the tank and roof structure was designed and constructed for this project. The aerator tank layout included two rings of steel tank and a third ring of mesh. The roof structure is supported by steel framing extending up and adjacent to the steel tank on the interior, which is founded on concrete foundations beneath the floor shell.

Recycled Water Tank: KJ provided engineering design services to the City for the Lower McCoy Recycled Water Storage Tank. The scope included evaluating tank volumes to maximize use of the available site, which required designing a crib wall around a third of the tank. A new recycled water pipeline was designed with separate inlet/outlet connections, and a new potable water pipeline with proper air gap was included to act as a backup source. Exterior stairs and landing platforms were also provided around the tank for access from the ground to the roof.

Reservoir Replacement, Sonoma State University, Rohnert Park, CA | Structural Designer Provided structural design services for a 350,000-gallon welded steel reservoir and site improvements, including influent and effluent piping.

Gypsy Hill and Royce Reservoirs Evaluations and Replacement, North Coast County Water District, Pacifica, CA | Structural Designer
Provided design of foundations for two 3 MG welded steel water storage tanks to replace existing aging tanks in a high seismic region.

Christen Hill Reservoir Replacement, North Coast County Water District, Pacifica, CA | Structural Designer
Provided structural design and civil coordination services for a 3.9 million gallon welded steel tank, replacing the existing tank. Designed tank, appurtenances and footings to resist high ground motions and nearby offsets from the two San Andreas fault traces located on alternate sides of the site. Provided client with alternative design to allow future expansion for hilltop site, while eliminating regulatory hurdles for the current project.

Cabrillo Reservoir Replacement, City of Beverly Hills, Beverly Hills, CA | QA/QC Providing Technical Review for the Cabrillo Reservoir Replacement Project. The project consists of two prestressed concrete reservoirs (each 2.15 MG for a total emergency storage capacity of 4.3 MG); 1,650 gpm pump station; Long-term site dewatering wells, drainage vault with pump, and connections to City storm drain; and a Reservoir Management System (RMS) to maintain the optimal chloramination residual, consisting of reservoir mixers, on -line analyzers, and disinfection chemicals.

Floriston Spring Filtration Project, Floriston Property Owners Association, Floriston, CA | Structural Designer
Structural designer provided the site civil design necessary to complete the bid documents for the improvements of the proposed filtered water storage tank site. The location of the storage tank site required a thorough investigation of several access road alignments, including an option to utilize an existing private access road. The grading and constructability of the tank required a design coordinated with the tank installation and concrete suppliers.

77 Jeff Tarbell
Structural

PROFESSIONAL SUMMARY
Jeff is a Senior Structural Engineer with over 18 years of experience designing various building structures and facilities throughout Southern California. His extensive background includes managing complex projects that require rigorous adherence to safety an d environmental standards, making him well-equipped to support this project. Jeff’s collaborative approach and proven track record in delivering high-quality structural solutions will contribute to successfully integrating the new reservoir with existing infrastructure, enhancing the district's operational efficiency.

TOTAL YEARS OF

EXPERIENCE
18 EDUCATION
BS, Architectural
Engineering,
California Polytechnic
State University, San
Luis Obispo, 2006

REGISTRATIONS
Professional Engineer -
Structural - California
(6340)
Professional Engineer -
Civil - California
(77364)
Professional Engineer -
Florida (87853)
Professional Engineer -
Civil - Oregon
(105952PE)
Professional Engineer -
Structural - Arizona
(79588)
Professional Engineer -
Structural - Oregon
(105952SE)
Professional Engineer -
Structural - Hawaii
(PE-18688)

PROJECT EXPERIENCE
Elevated Tank Replacement Study, City of Davis, Davis, CA | Structural Engineer KJ was selected to determine the preferred location for a new elevated water storage tank that will replace an aging tank installed in1952 that does not meet current seismic design standards.

KJ provided the City of Davis (City) with a Draft Elevated Tank Alternatives Impacts to Water System Operations Technical Memorandum that provided an initial evaluation of elevated tank replacement options. The project was put on hold until an update of the City’s hydraulic model was completed and was rescoped with the City’s preference to pursue a replacement elevated tank compared to other alternatives.

Disinfection Modernization Design, County of Ventura, Ventura, CA | Structural Engineer The District has contracted KJ to provide professional engineering services to design a new, 3.0 mgd capacity Ultra-Violet (UV) disinfection system.

Eastside to Westside Interconnection Waterline, City of San Buenaventura, CA | Structural Engineer
The City of San Buenaventura (City) is located within the County of Ventura. The City of Oxnard binds it to the South, Ventura County to the East and North, and the Pacific Ocean to the West.

The City proposed constructing the infrastructure necessary to move water from the City’s East to the West, primarily during Westside supply outages and peak demand scenarios. The City’s water system does not have a way to move sufficient water from the East side to the West side.

KJ designed the installation of pipelines close to three miles (15,100 lf) in two separate alignments. The project will be constructed in two main pipeline segments: one to bring water from the Easternmost portion of the City to the Midtown area (Eastside to Midtown) and one to bring water from the Midtown area to the Western side (Midtown to Westside).

Well 30 Manganese Treatment Design, City of Davis, Public Works Department, Davis, CA | Structural Engineer
Design services for Well 30 manganese treatment project under on-call engineering services contract (Task Order 12). Recent water quality sampling at the well indicates elevated manganese concentrations above the secondary maximum contaminant level (MCL). Site improvements at the Well 30 site related to this project will include treatment process 78 Jeff Tarbell, PE
Professional Engineer -
Structural - Louisiana
(PE.0047831)
Professional Structural
Engineer - Oklahoma
(31918)

MEMBERSHIPS /

AFFILIATIONS
Structural Engineers
Association of
California (SEAOC),
Member
Structural Engineers
Association of
California (SEAOC)
Wind Committee,
Voting Member
National Council of
Structural Engineers
Associations
(NCSEA), Member
National Council of
Structural Engineers
Associations (NCSEA)
Structural Licensure
Committee, Voting
Member
NCEES Model Law
Engineer
(MLE)NCEES Model
Law Structural
Engineer (MLSE)
components, a new building, and a standby generator. Project will also include bidding assistance services and engineering services during construction.

Planet Earth Recycling Center, Vernon, CA | Structural
High seismic anchorage and concrete foundation design for large-scale recycling equipment including cooling towers, nitrogen tanks, washline, grinders, decon line, flake sorter, boilers, thermoformers, extruders, mezzanine structures, silos, and more.

District Operations Building, Rancho Cucamonga, CA | Structural Performed structural detailing and analysis for masonry bearing walls, masonry shear walls, entry structure, steel storage mezzanines, and metal stud office partitions.

Ventura County Medical Center, Ventura, CA | Structural Created a structural analytical model for gravity and lateral design of a five-story medical office building with composite steel beams, girders, and RBS moment frame connections over grade beam and mat foundations spanning deep soil mixing system improvem ents Kapolei Energy Storage, Oahu, HI | Structural | Structural Mat foundation design for largest BESS project in Hawaii innovating a front-side anchorage solution for back-to-back installations.

Ho’Ohana Solar, Oahu, HI | Structural
Driven steel pile, drilled concrete pier, and concrete mat/slab foundations for PV and BESS skidded inverters, CAB above ground cable management, and battery energy storage system (BESS).

Knob Hill Apartments Los Angeles, CA | Structural
Executed structural calculations and detailing for lateral analysis of two to five-story wood shear wall apartment structures over podium with terraced layout of masonry and concrete shear walls at various levels.

Disney’s Pioneer Mercantile, Anaheim, CA | Structural
Generated lateral and gravity design and detailing for replacement of existing log structure with new themed stud walls and concealed connections including interfacing of wood, steel, and polygem epoxied PVC to replicate faux log construction.

Florida Renewable Partners (7) Solar Energy Plants, Various Sites, FL |Florida Power & Light (7) Solar Energy Plants, Various Sites, FL | | Structural Driven steel pile and concrete mat/slab foundations for PV skidded inverters and CAB above ground cable management

79 Patrick Tran, PE
Civil/Piping

PROFESSIONAL SUMMARY
Patrick is a highly skilled Civil Engineer with over seven years of experience in the field. He has a strong background in co ndition assessments and designing and managing groundwater treatment projects, specializing in removing contaminants such as perchlorate, volatile organic compounds (VOCs), and PFAS. He easily adapts to project needs and proactively communicates with engineering professionals and clients to ensure successful project outcomes.

TOTAL YEARS OF

EXPERIENCE
7 EDUCATION
BS, Civil and
Environmental
Engineering,
University of
California, Los
Angeles

REGISTRATIONS
Professional Engineer -
Civil - California
(92907)
Professional Engineer -
Civil - Texas (153119)
Professional Engineer -
Civil - Washington
(24016250)
Professional Engineer -
Civil - Oregon
(105065PE)

PROJECT EXPERIENCE
La Vista Tank and Booster Pump Station Design, Carmichael Water District, CA | Civil Engineer
Design of a new 3.0 MG welded steel tank and booster pump station. The tank is supported on a cast-in-place reinforced concrete ring foundation. The booster pump station is a special reinforced masonry shearwall building with a mat foundation in accordance with the 2019 California Building Code, ASCE 7-16, and AWWA D100-11.

0.85 MG East Dunne Hillside Water Reservoir and Pump Station Upgrades, City of Morgan Hill, CA | Civil Engineer
Design of a 0.85 MG welded steel water storage tank with site development, including a steep access road with retaining walls. KJ has been providing professional design services required to update the previously completed designs of the East Dunne Booster Pump Station modifications and the East Dunne Hillside Water Reservoir, working closely with City staff. KJ will provide electronic files of design plans in AutoCAD format and one full-sized set of drawings on mylar.

Backwash Storage Tank, United Water Conservation District, Santa Paula, CA | Civil Engineer The project included preliminary and final design services for a 3,500 gpm dual -media iron and manganese treatment and removal system to treat the equivalent of one Lower Aquifer System well at the El Rio Facility. Additionally, a technology review of various nitrate treatment technologies was performed to treat Upper Aquifer System wells at the El Rio Facility.

Provisions are included in the iron and manganese treatment system design to incorporate and integrate nitrate removal facilities in the future.

Iron and Manganese Treatment Plant at the El Rio Treatment and Groundwater Recharge Facility, United Water Conservation District, Santa Paula, CA | Civil Engineer Served as the civil designer for expanding the El Rio water treatment plant and groundwater recharge facility to include iron and manganese treatment. Responsibilities included site paving, grading, horizontal control, and yard piping plans and profiles. 80 Patrick Tran, PE
PFAS Groundwater Treatment Project (N-Wells) and Well Q2 Perchlorate Removal Facility, Santa Clarita Valley Water Agency, SANTA CLARITA, CA | Civil Engineer Served as the civil designer for a PFAS groundwater treatment site. Responsibilities included site paving, grading, horizontal control, and yard piping plan. The project included a bench -scale evaluation of GAC and IX as well as the site layout for pre-purchased treatment vessels. For the 6,000-gpm capacity of the three N Wells, David presented 6 vessels (3 trains) using IX with a 2 - minute empty bed contact time (EBCT), and 24 vessels (12 trains) using granular activated carbon (GAC) with a 10-minute EBCT. The preliminary design included site renderings of the completed site, new fencing, pre-filters, yard piping, the treatment pad, treatment vessels, and a new chemical storage building.

Well 205 Perchlorate and VOC Treatment Final Design, Santa Clarita Valley Water Agency, Santa Clarita, CA | Civil Engineer
Project involved final design of SCVWA’s Well 205 Groundwater Treatment Improvements Project. Planning and preliminary design of a wellhead Groundwater Treatment Facility for SCV Water's Well 205 with a treatment capacity of 2,700-gpm. Assessed perchlorate and TCE treatment alternatives including IX, PTA, and GAC. Developed preliminary design for GAC and IX system, including pre-filters and chemical area for removal of perchlorate and TCE from the groundwater.

Sunset Reservoir Complex Final Design, Pasadena Water and Power, Pasadena, CA | Civil Engineer
Designed site layout and yard piping during preliminary design of the Sunset Reservoir Replacement project for Pasadena Water and Power. KJ designed a centralized GAC and IX facility treating 1,2,3-TCP and perchlorate for four wells (total flow 3,000 gpm). Supported disinfection facility design development.

Orange Wells 20, 21 & 22 Groundwater Treatment, Orange County Water District, Fountain Valley, CA | Civil Engineer
Served as the civil lead and designed the site renovations. Challenges included tight site constraints and neighboring private property and business considerations. The initial design project included four wells (Wells 9, 19, 23, and 24) using ion exchange (IX) treatment with cartridge pre-filters, one of two trains of treatment vessels, and associated site work and year piping. Wells 9, 19, and 23, have a capacity of 1,400 to 2,000-gpm and required a since train of lead-lag IX 12-foot-diameter vessels. Well 24 with a capacity of 2,500-gpm, required two trains of IX vessels. Each IX treatment system includes a rinse or “flush to waste” Pipeline for use following resin change-outs. This project received approval from the California Division of Drinking Water (DDW) and is currently out for bid. A second follow-on project includes three wells (Wells 20, 21, and 22) using a similar design.

Garfield Reservoir and Pump Station Replacement, City of South Pasadena, South Pasadena, CA | Design Engineer
Helped to prepare as-built drawings after the construction of two partially-buried, cast-in-place concrete reservoirs (totaling 6.5 million gallons), and new pump station for the city of South Pasadena.

81 Erin Hoepfl, PE
Electrical/Instrumentation

PROFESSIONAL SUMMARY
Erin is an electrical engineer with experience that spans direct engineering analysis through design. She has worked with multi-disciplinary teams supporting projects from concept to final design. Her expertise includes project development, issuing engineering design packages, and the preparation of calculations, specifications, work planning instructions, and test plans. Erin has conducted modeling, simulation, and analysis of power systems to evaluate AC and DC loading and coordination for multiple nuclea r plants. She has provided new and revised electrical loading and protection calculation updates to evaluate proper margin and assure that coordination for the existing power system is available for proposed modifications. She has worked on the electrical design for multiple water treatment plants and pump stations, including electrical loading and control design.

TOTAL YEARS OF

EXPERIENCE
16 EDUCATION
BS, Electrical Engineering,
Clemson University,
2009

REGISTRATIONS
Professional Engineer -
Maryland (47348)
Professional Engineer -
Illinois (062065834)

PROJECT EXPERIENCE
1 MG Welded Steel Tank, City of Newman, Newman, CA | Electrical Engineer KJ provided preliminary to final design and construction management for Well 10, designed to meet Cr6 limits. The project included equipping a 2,100 gpm well, a 1.5 MG steel tank with future 1.0 MG expansion, a 3-pump booster station with surge control, a standby generator, a disinfection system, and over 4,000 feet of transmission and distribution mains to connect with the City’s water system.

Floriston Spring Filtration Project, Floriston Property Owners Association, Floriston, CA | Electrical Engineer
Site improvements related to a new 150,000-gallon filtered water storage tank site included grading and drainage and access road alignment. The storage tank site will be located on a hillside with a very steep existing grade requiring a thorough investigation of several access road alignments including an option to utilize an existing private access road.

Phase 2B Recycled Water Tanks, Santa Clarita Valley Water Agency, Santa C larita, CA | Electrical Engineer
Two new Recycled Water Tanks and associated motorized valves. A seismic monitoring system was installed to detect a seismic event and close/open the inlet valves of the tank. Coordination with SCE was completed for the new service to the site. A meter pedestal, seismic control panel, lighting panel, and associated equipment were specified in the design. The new control panel and instrumentation were selected to operate the valves based on level properly. A new control panel was installed at the site and connected to the site east of it with two existing tanks.

Vic Trace Reservoir Replacement, City of Santa Barbara, Santa Barbara, CA | Electrical Engineer
Replacement of a 10 MG drinking water storage reservoir to improve operational flexibility and maintain critical drinking water storage. The design includes demolition and a new pump building for the reservoir. Coordinating with SCE for the new pump building and relocating existing overhead utility lines will be completed during the design. Electrical is responsible for determining the required service size for the service cabinet, automatic transfer switch, standby 82 Erin E Hoepfl, PE
generator, and lighting panel for the pumps, motor-operated valves, and miscellaneous loads. A separate service is provided for the new IT Building.

Blossom Valley Reservoir Replacement Project (JN218035), Padre Dam Municipal Water District, San Diego, CA | Electrical Engineer
Replaced an existing reservoir with a circular prestressed concrete tank, new valve vault, and PRV vault. Designed electrical systems, including a new service panel, conduits, wiring, lighting, receptacles, control valves, 120V panels, and mixer instrumentation. Relocated and upgraded the control panel to support new I/O. Evaluated electrical loads and sized equipment, conduit, and wiring for both sites, ensuring reliable operation of pumps, valves, and monitoring systems.

Backwash Storage Tank, United Water Conservation District, Santa Paula, CA | Electrical Engineer
The project included preliminary and final design services for a 3,500 gpm dual -media iron and manganese treatment and removal system to treat the equivalent of one Lower Aquifer System well at the El Rio Facility. Additionally, a technology review of various nitrate treatment technologies was performed to treat Upper Aquifer System wells at the El Rio Facility.

Provisions are included in the iron and manganese treatment system design to incorporate and integrate nitrate removal facilities in the future.

Tesoro Viejo Water Treatment Plant/Wastewater Treatment Plant Engineering Services during Construction, Tesoro Viejo, LLC, Madera, CA | Electrical Engineer This project includes a potable water reservoir and five associated pumps, a hydro -pneumatic tank, an air compressor and receiver, and sodium hypochlorite and ammonia metering pumps.

Responsible for the electrical and instrumentation design, including the sizing and design of the MCC, diesel generator, and PLC for the power and control of the pump station. Cable sizing and conduit routing were provided for all equipment. In addition, the specifications for the electrical and instrumentation equipment were provided.

Lift Station 1 Replacement, Rainbow Municipal Water District, Bonsall, CA | Electrical Engineer This design consists of a new wet well with two pumps and emergency storage basin located at a new site near the existing lift station. Responsible for design of the electrical and instrumentation which included the sizing and design of the MCC, ATS, diesel generator, control panel, and associated instruments to monitor the system. Coordinated with the utility company for service to the new site. Cable sizing and conduit routing was provided for all equipment.

Provided specifications for the electrical and instrumentation equipment.

West Lake Tahoe Regional Water Treatment Plant Phase 2, Tahoe City Public Utility District, Tahoe City, CA | Electrical Engineer
Designed electrical and instrumentation systems for a new water treatment plant and replacement of lake intake pumps at Lake Tahoe. Responsibilities included sizing and designing MCCs, ATS, standby generator, control panels, and instrumentation for both th e treatment plant and intake pump station. Coordinated utility service upgrades and performed electrical load and generator sizing calculations. Developed electrical and instrumentation equipment specifications to support reliable and efficient system operation.

83 Milt Larsen, PE
Corrosion/Protective Coatings

PROFESSIONAL SUMMARY
Milt has been a project manager, process engineer, and technical director on numerous water quality evaluation and corrosion control studies, water distribution, and treatment projects. He has evaluated and designed treatment facilities for groundwater contaminants, including iron, manganese, arsenic, ammonia, hydrogen sulfide, NDMA, PCE, and DBCP. Milt†™s experience includes designing groundwater treatment improvements for facilities ranging from 50 gpm to 100 MGD and was recently the process engineer for pl anning and pilot testing a 36 mgd iron and manganese treatment plant.

TOTAL YEARS OF

EXPERIENCE
50 EDUCATION
BS, Civil Engineering,
Kansas State
University, 1973
MS, Civil Engineering,
Kansas State
University, 1975

REGISTRATIONS
Professional Engineer -
Sanitary - Washington
(18985)
Professional Engineer -
Civil - Oregon
(60823PE)
Professional Engineer -
Civil - Washington
(18985)

MEMBERSHIPS /

AFFILIATIONS
American Water Works
Association, Member
National Association of
Corrosion Engineers,
Member
Water Environment
Federation, Member

PROJECT EXPERIENCE
1 MG Welded Steel Tank, City of, Newman, Newman, CA | Corrosion Engineer Magnesium anode cathodic protection design and protective coatings specification for a 1 MG steel water storage tank. Reviewed submittals and provided construction support services Walnut 2 West 2.0 MG Tank Rehabilitation and Recoating, City of Simi Valley, Simi Valley, CA | Corrosion Engineer
KJ assisted the District with developing design documents for the rehabilitation and recoating of the Walnut 2 West 2.0 MG Tank. Rehabilitation work included seismic retrofit, recoating, and other maintenance items, including replacing the outlet pipeline connection, adding a cleanout, repairing spiral cracking at the outlet connection, modifying the floor drain, repairing corroded rafters, adding new roof bracing, and caulking/sealing the roof rafters.

La Vista Tank and Booster Pump Station Design, Carmichael Water District, Carmichael, CA | Civil/Corrosion Engineer
Design of a new 3.0 MG welded steel tank and booster pump station. The tank is supported on a cast-in-place reinforced concrete ring foundation. The booster pump station is a special reinforced masonry shearwall building with a mat foundation in accordance with the 2019 California Building Code, ASCE 7-16, and AWWA D100-11.

0.051 MG Process Water and 0.073 MG Fire Water Welded Steel Tank , City of San Jose, Regional Wastewater Treatment Plant, San Jose, CA | Civil/Corrosion Engineer Provided corrosion engineering and protective coatings design for three welded steel water storage tanks (51,000-gallon, 73,000-gallon, and air gap tank) as part of a regional wastewater treatment plant upgrade.

Smith Saddle Tanks Rehab, Marin Municipal Water District, Corte Madera, CA | Corrosion Engineer
Provided technical support and QC review for the evaluation of two aging 5 MG steel reservoirs with impressed current cathodic protection.
84 Milt Larsen, PE
Terminal Reservoir and Pump Station Design, City of The Dalles, The Dalles, OR | Project Engineer
Design of the 2.7 mg welded steel Terminal Reservoir to create the new 800 Pressure Zone.

The reservoir is equipped with impressed current cathodic protection. Project includes a 1,500 gpm booster pump station, 8 PRV stations and transmission piping.

Water Storage Tank Improvements, Lakewood Water District, Lakewood, WA | Project Manager
Evaluated water stratification and chlorine residual loss in the District's ground storage reservoirs, standpipes, and elevated tanks. Mixing improvements are recommended to improve water quality and reduce tank water age.

Backwash Recover Tank, United Water Conservation District, Santa Paula, CA | Project Engineer
Design of a 3,850-gpm iron and manganese water treatment plant with provisions to expand to 9,350 gpm. The District pilot tested pyrolusite and manganese greensand media and selected manganese greensand with an anthracite cap. The treatment consists of ads orption/catalytic oxidation with chlorine as the oxidant. The facility includes backwash recovery. The treated water is blended with water from the upper aquifer to lower nitrate levels.

Well 17 Design, Linda County Water District, Marysville, CA | Project Engineer Improvements of the existing well site and a new supporting 1-million-gallon water storage tank site included layout, grading and drainage, gravity utility layout, and stormwater treatment compliance. For conformance, minimum finished floor elevations were based on FEMA flood maps. The new storage tank was a partially buried prestressed concrete reservoir. Grading of the storage tank site coordinated with existing development and a future master plan adjacent to the site. This coordination included survey control discrepancies, which were successfully mitigated before construction.

Saticoy Water Conditioning Facility Expansion, City of San Buenaventura, Ventura, CA | Technical Advisor
Design of water treatment plant expansion from 2,000 gpm to 7,000 gpm utilizing chlorination followed by adsorption/catalytic oxidation. Design included conversion from sodium hypochlorite to chlorine feed and sodium hydroxide feed system.

Wellfield Water Treatment Plant, Preliminary Design Services, Calleguas Municipal Water District, Thousand Oaks, CA | Process Engineer
The preliminary design of the Wellfield WTP includes using cartridge filtration to treat up to 55 cubic feet per second of groundwater from 18 wells located at the Wellfield No. 1 and Wellfield No. 2 sites. Project tasks include; site surveying, utility research and mapping, chemical system modifications/improvements based on evaluations, reservoir baffling, cartridge filters design criteria and layout, design of a storage building, pipeline connections and vaults design, confirmation of plant hydraulics, site hydrology/drainage plan, and electrical and instrumentation drawings.

85 Loree A. Berry, PE
Senior Project Manager
Education
BS, Geological Engineering,
University of Wisconsin,
Madison, 2001
Registrations
• R egistered Professional Civil
Engineer: California No. 73221
• A pplied Project Management
Professional, APMP
• V entura County Registered W ell
Inspector
• City of Oxnar d Registered W ell
Inspector
Professional
Associations
• Americ an Public W orks
Association – V entura County
Chapter, Member, Executive
Board (2017 to 2022)
• Americ an Society of Civil
Engineers, Member, Y ounger
Member Forum Board
(2005-2009)
• Calif ornia Geotechnical
Engineering Association
Member Firm
• Americ an W ater Agencies of
V entura County Member Firm
Joined Yeh
4/2018
Professional Experience
Loree Berry has more than 22 years of professional engineering experience with 20 of those living in V entura and working along the Southern California coast providing geotechnical engineering and geology services for a wide range of private and public agency clients, utility districts, transportation departments, special geologic hazard districts, and construction services. She is proficient in AWW A and building code design for water infrastructure to complete reporting to characterize site and subsurface conditions, manage geologic hazards, and provide geotechnical parameters for the design of public improvements, structures, roadways and bridges, and utility infrastructure. She is familiar with the geology and geotechnical challenges and is highly experienced in evaluating subsurface conditions to develop design recommendations for water treatment, storage, and delivery. Loree is experienced providing engineering support during construction and working with the construction manager and materials testing firm to participate in site observations during earthwork, and respond to submittals and requests for information or as needed geotechnical engineering consultation.

Relevant Work History
AG 3 Tank Replacement and Site Improvements, Camrosa
Water District, Camarillo, CA
Project Manager for the design of a 100,000-gallon replacement for the AG-3 nonpotable water storage tank in Camarillo, California. Hillside cuts will be required to create an expanded tank pad that includes a perimeter vehicle and maintenance access road around the replacement tank. A new all-weather access road is also being designed to improve access to the site. Y eh performed field exploration, laboratory testing and engineering analysis to estimate subsurface conditions for use in calculating liquefaction and seismic hazard, shallow foundations for the re-placement tank, drilled shaft foundation for a radio antennae, and retaining wall design earth pressures. Loree was the point of contact for the project and provided geotechnical engineering review for the recommendations and final report preparation.

Tuolumne Meadows Tank and Pipeline Project, Yosemite-Tuolumne Water District, Yosemite National Park, Inyo County, CA Project Manager for geotechnical design of a new 200,000 gallon above ground bolted steel potable water storage tank. The project also includes construction of approximately 3 miles of water pipeline. Subsurface exploration was coordinated with National Parks Service and the Y osemite-Tuolumne Meadows W ater District to perform soil borings and rock coring at the proposed tank site. Geophysical surveys were performed at the tank site and along select portions of the pipeline alignment. Y eh performed engineering analyses and prepared a Geotechnical Report for the project.

Signal Tank Zone Improvements, Casitas Municipal Water District, Ojai, CA
Project Manager for geotechnical recommendations to replace an existing 1.0MG welded steel water storage tank in-kind as well as a new booster station and approximately 2,400 linear feet of new waterline to expand the Signal Zone system. Y eh performed a subsurface exploration program consisting of drilled borings, backhoe test pits, and geophysical surveys, performed analyses, and prepared a Geotechnical Report for the project.

Geotechnical • Geological • Construction Services
86 Loree A. Berry, PE
Senior Project Manager
Ventura River Water District 2023 CIP Projects, Oak View and Ojai, CA Project Manager for geotechnical services for the design of V entura River W ater District’s 2023 W ater Projects consisting of separated water main replacements, improvement sections, and connections ranging from 100 to 4,000 linear feet, new and replacement of two, 0.5MG above-ground water storage tanks, and site improvements including an emergency generator with soundwall protection at an existing VRWD facility. The geotechnical evaluation consisted of a program of project coordination including permitting and utility clearance, reviewing existing geologic and geotechnical data, field exploration, laboratory testing, and engineering analyses to support recommendations for design of the new and replacement pipelines, water tanks, and site improvements. The field exploration for the project consisted of hollow stem auger drilling, test pits, and pavement coring and hand augering.

Ventura Water Reclamation Facility Membrane Bioreactor and Ultraviolet Disinfection Project | City of Ventura, CA
Project Manager for design of advanced treatment and disinfection to replace the existing equipment at the WRF. Y eh is a Geotechnical Report to support the Basis of Design Report for the project.

Loree managed a field exploration program of Cone Penetration T est soundings, drilled borings, and installation of temporary monitoring wells to evaluate the subsurface conditions and prepare recommendations for design of the new facilities. The project design will need to overcome difficult geotechnical conditions including shallow groundwater, soft ground, and potential for strong ground shaking during an earthquake.

Recycled Water Storage Reservoir and Pump Station at the Camarillo Water Reclamation Facility | City of Camarillo, CA
Project Manager for geotechnical services for design, a new pump station, and construction of a partially buried 1-million gallon concrete water storage reservoir and associated conveyance pipelines at the existing water reclamation facility. Geotechnical services included permitting, utility clearance, drilling and sampling, well installation, environmental soil and water screening, geotechnical laboratory testing, engineering evaluations and preparation of a draft and final geotechnical report.

Santa Paula Water Recycling Facility Advanced Treatment System, Odor Control Unit, and Bypass Basin | City of Santa Paula, CA Project Manager during geotechnical services for a new Advanced Treatment System at the existing W ater Recycling Facility to reduce chloride concentrations in the treated water. The equipment will be housed in an at-grade structure constructed on a 17,000 square foot building pad. Up to 7 feet of fill will need to be placed within an existing basin to raise the site grades of the proposed structure. Y eh performed data review, drilling, laboratory testing, and prepared a Geotechnical Report for the project that included recommendations for shallow foundation design, seismic considerations, grading and material specifications. Y eh used existing geotechnical data to provide micropile recommendations for an adjacent odor control unit and also provided recommendations for grading an exiting percolation basin to be a lined effluent bypass basin.
87 Gresham D. Eckrich, PE, CEG
Senior Project Manager
Education
MS, Civil and Environmental
Engineering, University of
California, Berkeley, 2007
BS, Geological Sciences, University
of Michigan - Ann Arbor, 2003
Registrations
• Registered Professional Civil
Engineer: California No. 75208
• Certified Engineering Geologist:

California No. 2601
• Registered Professional Geologist:

California No. 8789
• LEED Accredited Professional
Professional
Associations
• American Society of Civil
Engineers
• American Public W orks
Association
• American Council of Engineering
Companies, Officer
• Association of State Dam Safety
Officials
• US Society of Dams
Joined Yeh
11/2016
Contact
391 Front Street Ste D
Grover Beach, CA 93433
805-481-9590 • www.yeh-eng.com
Professional Experience
Gresh has more than 19 years of experience in engineering geology and geotechnical engineering. He has specialized experience in managing geotechnical services for bridge design and construction projects. His experience with bridge and transportation projects has included evaluations for slope stability, earthquake hazards, liquefaction, seepage, scour, seismic response, and mitigation of those hazards for local, state and federal projects. Mr.

Eckrich is proficient in the preparation of geotechnical, engineering geology, and geologic hazard reports in accordance with California Department of Transportation (Caltrans) guidelines and using AASHTO LRFD Bridge Design Specifications. He has managed geotechnical investigations and analyses for onshore and nearshore projects, and has considerable international project experience in Panama, Saudi Arabia, Abu Dhabi, Dubai, and Canada. He has worked closely with San Luis Obispo County, FHW A, Caltrans Local Assistance and agencies throughout California for various projects involving federal funding through the Highway Bridge Program, Emergency Response Funds and FEMA.

Relevant Work History
Shandon Dual Water Tank Project, San Luis Obispo County, CA, 2023 The County of San Luis Obispo is designing an approximately 350,000-gallon above-grade welded steel tank sited on a mapped landslide east of the unincorporated community of Shandon. The County is also planning to replace the existing 212,000-gallon bolted steel tank with a welded steel tank with a new 350,000-gallon water storage tank in the same location.

Y eh reviewed published geologic maps and historic aerial photographs and performed a site reconnaissance to evaluate the landslide activity and potential impacts to the project, performed geotechnical analyses for design of the new tank, and provided recommendations for design of the new tank.

Main West Tank Replacement, City of Paso Robles, CA, 2017-2020 The City of Paso Robles replaced a 4 million-gallon reservoir constructed in 1925, with a prestressed concrete tank constructed in the western half of the previous reservoir footprint.

The reservoir is located on an east-west trending ridge in steep terrain. The original reservoir was constructed by excavating a cut pad on top of the ridge. The northern portion of the pad appears to have been constructed by placing fill within a valley north of the existing reservoir.

Y eh reviewed previous studies dating back to 2004 and groundwater data provided by the City to supplement and refine geotechnical exploration for the new tank design. Y eh performed geotechnical analyses for design of the new reservoir and provided recommendations for earthwork, trench design, foundation design for the new tank, and slope stability mitigation for the unstable slope immediately north of the existing tank.

Alamo Tank Replacement, Los Osos, CA, 2016-2018
Golden State W ater Company replaced an approximately 34-foot diameter above-grade bolted steel tank with a welded steel tank on a relatively steep hillside south of the community of Los Osos, approximately 40 feet above Alamo Drive. Y eh evaluated geologic hazards that could impact the project, performed geotechnical analyses for design of the new tank and provided recommendations for design of the new tank.

El Estero Wastewater Treatment Plant Improvements, City of Santa Barbara, CA, 2013-2016
Responsible for geotechnical evaluation of the proposed expansion of the existing secondary processing facilities. Evaluated mitigation alternatives for potentially liquefiable soils and provided input to the design team’s preparation of plans and specifications to mitigate the liquefaction hazard.
88 Nick Simon
Senior Project Geologist
Education
BS Geological Sciences, University
of California, Santa Barbara, CA,
1997
Associate - Liberal Arts,
De Anza Junior College, Cupertino,
CA, 1995
Certifications
• Geologist in Training #687
• OSHA 40 HR HAZWOPR
• Nuclear Density Gauge Certified
• Caltrans Rope Access ICC
Strength
Industry Tenure
Since: 1995
Joined Y eh: 6/2018
Contact
632 East Thompson Blvd.

V entura, CA 93001
805-481-9590, ext. 271
www.yeh-eng.com
Professional Experience
Nick has extensive experience in geotechnical and environmental field work, laboratory testing, and report writing. His duties have included geotechnical, geological, and environmental exploration, drilling/coring and sampling, boring log creation (using Gint), inclinometer installation/monitoring and interpretation, construction monitoring, monitoring and maintenance of landslide instrumentation and dewatering facilities, field percolation testing, compaction testing, implementation of environmental soil sampling plans. Nick has expertise with all methods of geotechnical drilling and laboratory testing and manages the V entura laboratory. Nick provides geotechnical services during construction and overseeing construction materials testing.

Relevant Work History
Ventura River Water District 2023 CIP Projects, Oak View and Ojai, CA
Project Geologist for geotechnical services for the design of V entura River W ater District’s 2023 W ater Projects consisting of separated water main replacements, improvement sections, and connections ranging from 100 to 4,000 linear feet, new and replacement of two, 0.5MG above-ground water storage tanks, and site improvements including an emergency generator with soundwall protection at an existing VRWD facility. The geotechnical evaluation consisted of a program of project coordination including permitting and utility clearance, reviewing existing geologic and geotechnical data, field exploration, laboratory testing, and engineering analyses to support recommendations for design of the new and replacement pipelines, water tanks, and site improvements. The field exploration for the project consisted of hollow stem auger drilling, test pits, and pavement coring and hand augering.

Signal Tank Zone Improvements, Casitas Municipal Water
District, City of Ojai, CA
Project Geologist. Performing geotechnical field services and analyses for replacement of an existing welded steel water storage tank and new booster station as well as approximately 2,400 linear feet of new waterline to expand the Signal Zone system. The project is located within the City of Ojai and requires subsurface investigation within shallow bedrock as well as for pipelines with the City right of way. A portion of the new pipeline alignment will traverse an existing slope behind private residential homes. Y eh’s geotechnical services for the project included permitting, utility clearance, geophysics, backhoe exploration, drilling and sampling, laboratory testing, engineering and preparation of a draft and final geotechnical report.

Ventura Water Reclamation Facility Membrane Bioreactor and Ultraviolet Disinfection Project | City of Ventura, CA
Project Geologist for design of advanced treatment and disinfection to replace the existing equipment at the WRF. Y eh is a Geotechnical Report to support the Basis of Design Report for the project. He supported the execution of the field exploration program of Cone Penetration T est soundings, drilled borings, and installation of temporary monitoring wells to evaluate the subsurface conditions and prepare recommendations for design of the new facilities.

The project design will need to overcome difficult geotechnical conditions including shallow groundwater, soft ground, and potential for strong ground shaking during an earthquake.

Education
BS Geological Sciences, University of
California,
Santa Barbara, CA, 1997
Associate - Liberal Arts,
De Anza Junior College, Cupertino, CA, 1995
Certifications
• Geologist in Training #687
• OSHA 40 HR HAZWOPR
• Nuclear Density Gauge Certified
• Caltrans Rope Access ICC Strength
Industry Tenure
Since: 1995
Joined Y eh: 6/2018
Contact
56 East Main Street, Ste 104
V entura, CA 93001
805-481-9590, ext. 271
www.yeh-eng.com
89 Nick Simon
Senior Project Geologist
Well 201 and 205 VOC Groundwater Treatment, Santa Clarita Valley Water Agency, CA
Project Geologist for geotechnical investigation and and reporting for the design of VOC treatment systems at two separate water well sites in Santa Clarita. Nick performed data review, field logging, laboratory testing, and provided recommendations for select portions of the Geotechnical Reports.

Civic Center Wastewater Treatment Plant Phase 2, City of Malibu, CA Project Geologist providing geotechnical services to support the design of the next phase of the City’s wastewater project. Services include geotechnical field investigation within private and public residential streets, which requires community coordination and advanced scheduling. Y eh is providing field exploration, laboratory testing, engineering analyses and report preparation for approximately 3 miles of new pipeline, storage reservoirs and sewer lift stations within the varying terrain of Malibu including segments along the beach and within bedrock within the hillsides.

Reservoir No. 2 Site Improvements, City of Camarillo, CA Project Geologist, Field Inspector during construction/installation of an anchored mesh soil stabilization system to mitigate a chronic erosion and maintenance issue along an existing 1H:1V cut slope north of Reservoir No. 2. The stabilization system consists of jute matting and steel wire mesh anchored to the slope using grouted soil nails on an approximately 10 foot by 10 foot grid. Y eh and Associates designed the anchored mesh system, prepared plans and specifications, and is currently performing inspection services during installation.

Corona del Mar Treatment Plant Access Road Stabilization, Goleta Water District, City of Goleta, CA
Project Geologist. Performing geotechnical field logging and stability analyses for the design of a re- aligned access road to the Corona del Mar Treatment Plant in Goleta, CA. A portion of the existing access road is failing and slipping out to the creek below due to ongoing erosion of the creek bank. Several repairs have been implemented over the years to stabilize the road and mitigate erosion. The more recent road failure has driven the Goleta W ater District to acquire land adjacent to the existing road to re-align the failed segment away from the creek bank. Y eh’s geotechnical services for the project include drilling and sampling, lab testing, and engineering analyses and input for wall design, roadway widening, and preparation of a draft and final geotechnical report.

Reclaimed Water Reservoir and Pump Station, Camarillo, CA Project Geologist. Provided geotechnical services for design of a partially buried, one million-gallon rectangular reinforced concrete reservoir with approximate dimensions of 119 feet by 134 feet and sited in the footprint of the existing sludge drying beds at the Camarillo W ater Reclamation Facility. A pump station will also be constructed directly south of the reservoir. The reinforced concrete walls will be designed for an undrained, restrained (at-rest) condition. Y eh reviewed existing geotechnical data from the site and supplemented that work with hollow stem auger drilling and installation of a temporary monitoring well. Geotechnical challenges include highly plastic clay soils and high groundwater.

Geotechnical services included permitting, utility clearance, field exploration, laboratory testing, and preparation of a draft and final geotechnical report with recommendations for design and grading of the site improvements.
90 Larry J. Frager , PE, PLS
Survey Manager
Mr. Frager currently serves as Survey Manager in the Santa Paula office of Benner and Carpenter, Inc., a Delane Engineering Company. Mr. Frager is responsible for project management of both civil engineering and land surveying projects. He also supervises and schedules the work for both the field staff and technical office staff. Mr. Frager is both a licensed civil engineer and land surveyor in the State of California with 36 years of experience, the last 31 years at Benner and Carpenter, Inc.

Relevant Experience:

County of Ventura - Annual Professional Services Contract – Land Surveying and Civil Engineering Services (Ventura County, CA) – Project Manager. Benner and Carpenter, Inc., a Delane Engineering Company, provides annual on-call land surveying services to the County of Ventura, Public Works Agency, County Surveyors Office an agreement renewed annually.

City of Ventura - Task Order Agreement for On Call Professional Services – Land Surveying (Ventura, CA) – Project Manager. Benner and Carpenter, Inc., a Delane Engineering Company, provides on-call land surveying services to the City of Ventura. The general scope of work includes providing land surveying and map checking services, including but not limited to: topographic mapping; boundary, centerline, and right of way surveys; construction layout, hydrographic surveys; precise geodetic leveling; cadastral surveys; land descriptions and exhibits; research of survey, title, and property records; applicable oversight of subconsultants as required; review of final tract and parcel maps for technical correctness, and such other services as may be required by the City. Pr ojects under this Agreement may involve one or more of the following: Domestic water distribution system; Recycled water distribution system; Sanitary sewer collection system; Storm drainage collection system; Arterial, collector and local streets; Transportation system; Buildings and other types of facilities; Public park improvements; Beach maintenance; Private development projects; Other undertakings to be determined.

City of Simi Valley Projects:
• 2361 Alamo Street - Topographic Survey (Simi Valley, CA) • 3802 Avenida Simi - Topographic Survey (Simi Valley, CA) • Guardian Building, 4100 Guardian Street - Aerial Survey & ALTA (Simi Valley, CA) • 4180 Guardian Street, Prepare Parcel Map TP-S-694 (Simi Valley, CA) • 555 Easy Street - Topographic Survey (Simi Valley, CA) • 904 Quimisa Drive - Aerial & ALTA Surveys (Simi Valley, CA) • Box Canyon Pump Station System - Topographic Survey (Simi Valley, CA) • Berylwood Elementary School - Construction Staking (Simi Valley, CA) • Churchill Project, 1453 Heywood Street, Parcel 2, 70 PM 67 - Lot Line Adj., (Simi Valley, CA) • City of Simi Valley Flag Property Line & Easement Lines, 3451 & 3467 Mason Court (Simi Valley, CA) • City of Simi Valley FY2023-2024 Major Streets - Monument Preservation (Simi Valley, CA) • CMWD CCSB Strengthening for Metrolink Score Improves., No. 614 - Topographic Survey (Simi Valley, CA) • Garden Grove Elementary School Paving, 2250 Tracy Avenue - Construction Staking (Simi Valley, CA) • Hollow Hills Elementary School, Irrigation Layout - Construction Staking (Simi Valley, CA) • Hillside M.S., 2222 Fitzgerald Rd, Portable Classroom - Construction Staking (Simi Valley, CA) • Rancho Simi Community Park, Lagoon Renovation, Phase 1 - Construction Staking (Simi Valley, CA) • Royal High School MPR Plaza - Construction Staking (Simi Valley, CA) • Santa Susana High School, Ramp Improvements - Construction Staking (Simi Valley, CA) • Simi Valley Water Quality Control Plant - Construction Staking (Simi Valley, CA) • Sycamore Canyon Park - Engineering Services (Simi Valley, CA) • Tapo Reservoir, Guardian Street & Tapo Street - Topographic Survey (Simi Valley, CA)

Registration:

Professional Engineer, Civil
CA #44725
Professional Land Surveyor, CA
#7998

Years of Experience: 36

Education:

B.S., Civil Engineering, South
Dakota School of Mines &
Technology
Various coursework in drainage
law, water management &
AutoCad
91 Larry J. Frager , PE, PLS
Survey Manager
Additional Public Agency Contracts:
• City of Simi Valley – On-Call Survey and Mapping (Simi Valley, CA) • City of Thousand Oaks – On-Call Professional Consulting Services: Land Surveying Services (Thousand Oaks, CA) • City of Ojai – On-Call Professional Services, Land Surveying (Ojai, CA)

Additional Project Experience:
• 45th Street East Tank Site Altitude Valve - As-Built Vault & Pipeline (Palmdale, CA) • Agoura Court Office Building - Construction Staking (Agoura Hills, CA) • Agoura Landmark, 29621 Agoura Road - Prepare Base Map, Construction Staking & Monumentation (Agoura Hills, CA)
• Agoura Road - Construction Staking, Curb & Gutter Realignment (Westlake Village, CA) • Agoura Road Bike Lane Spec # Nib #99-03 - Construction Staking (Agoura Hills, CA) • Agoura Road Street Overlay & Median Improvements - Construction Staking (Agoura Hills, CA) • Arroyo Vista Park - Construction Staking and Parking Lot Improvements (Moorpark, CA) • Avenida De Los Arboles at Big Sky Drive Median Improves. - Construction Staking (Thousand Oaks, CA) • Bohnett Park Renovation, Handicap Ramp - Construction Staking (Santa Barbara, CA) • Borchard Skate Park - Construction Staking (Newbury Park) • Briggs Elem. School - Construction Staking, Parking & Playground Improvements (Santa Paula, CA) • Canwood & Kanan - Construction Staking, Sewer & Water (Agoura Hills, CA) • Canwood Corp. Center - Construction Staking (Agoura Hills, CA) • Canwood Corporation Center, Building C - Topographic Survey and Construction Staking (Agoura Hills, CA) • Carpinteria Creek Park - Construction Staking (Carpinteria, CA) • Carpinteria Skate Park, 5775 Carpinteria Avenue - Construction Staking (Carpinteria, CA) • City of Calabasas, Mulholland Highway Road Repairs - Topographic Survey & Slope Staking (Calabasas, CA) • City of Fillmore, Central Park, Phase II - Construction Staking (Fillmore, CA) • City of Fillmore, Fillmore Central Park, Phase I - Construction Staking (Fillmore, CA) • Conejo Mountain Memorial Park - Various Survey Services, including Construction Staking, Topo Survey, ALTA Survey (Camarillo, CA)
• Dos Vientos YMCA - Construction Staking (Newbury Park, CA) • Forest Cove Park Rehabilitation, 5451 Forest Cove Lane - Construction Staking (Agoura Hills, CA) • Goleta Valley Jr. High School Playground & Parking Lot - Const. Staking & Mon. Pres. (Goleta, CA) • Harvest Sports Park, East Area 1 - Construction Staking (Santa Paula, CA) • Highway 101/Kanan Rd. - Construction Staking (Agoura Hills, CA) • Highway 126 Bike Path at Community Park - Construction Staking (Ventura, CA) • Janss Rd. Park and Ride Facility - Construction Staking (Thousand Oaks, CA) • Lassen Ave. Bike - Construction Staking (Moorpark, CA) • Lindero Cyn. Rd. & Agoura Rd. - Curb Staking (Westlake Village, CA) • Lindero On-Ramp Waterline - Construction Staking (Westlake Village, CA) • Medea Creek Restoration - Construction Staking (Agoura Hills, CA) • Oak Hills Elem. School, Playground Repair - Construction Staking (Oak Park, CA) • Sumac Elementary School - Construction Staking (Agoura Hills, CA) • Ventura River Water District, Retrace Road Easement to Alto Tank Site (Ojai, CA) • Westlake Village Community Park Baseball & Soccer Fields - Construction Staking (Westlake Village, CA) • Westlake Village Park - Construction Staking, Export Grading (Westlake Village, CA) • Westpark Community Center - Construction Staking & Topo Survey (Ventura, CA) • Westpark Community Center, Phase II - Construction Staking (Ventura, CA) • Westside Pedestrian & Bicycle Improves., Spec #2016-043 - Const. Staking & Mon. Pres. (Ventura, CA)

92 Richard F. Yeager Jr., PE
1016 Broadway, Ste. A, El Cajon, CA 92021
Phone: 619.312.0195

Richard F. Yeager Jr., PE

Principal Corrosion Engineer

Richard F. (Rick) Yeager Jr. is a California Registered Civil Engineer and a NACE Int’l Certified Cathodic Protection Specialist with a broad background in corrosion engineering, inspections, and construction support services. Mr. Yeager has extensive experience in water and wastewater corrosion control and cathodic protection system designs, corrosivity assessments, pipe and coating materials of construction, and inspection and monitoring of installed piping systems. Mr.

Yeager has also provided construction inspection services for projects that have included pipelines, water reservoirs, treatments plants, and roadways.

Project Experience:

Hauck Mesa Reservoir and Flow Control Facility, San Diego County Water Authority, CA: Corrosion Engineer. RF Yeager Engineering provided a corrosivity assessment concluding in a report with recommendations for corrosion control to minimize the risk of premature corrosion failures and maximize the useful service life. Created a cathodic protection design, which includes reviewing standards, design analysis/calculations, redline markups to civil plan and profile drawings, 60%, 90%, 100%, and final design details with response comments, corrosion control specifications, cost estimates, and attending project meetings.

San Diego 12 Flow and Alvarado Hydroelectric Facility, San Diego County Water Authority, CA: Corrosion Engineer. RF Yeager Engineering provided a corrosivity assessment concluding in a report with recommendations for corrosion control.

Created a cathodic protection design which includes reviewing standards, design analysis/calculations, redline markups to civil plan and profile drawings, final design details with response comments, corrosion control specifications, cost estimates, and attending project meetings.

San Vicente Dam Raise Design Review, San Diego County Water Authority, CA:

Corrosion Engineer. RF Yeager Engineering provided a design review with comments for corrosion control on the San Vicente Dam Raise pro ject plans and specifications.

Pipeline 3 Reline Sweetwater to Lower Otay, San Diego County Water Authority, CA: Corrosion Engineer. RF Yeager Engineering’s inspection services included a visual inspection of the surface preparation of all 17 outlets, verification of all coating products used, proper mixing of plural component coatings, atmospheric monitoring during blasting, inspection during coating operations, and the verification of specified dry-film mil thicknesses. From the inspections, a report was provided noting observations, conclusions and recommendations.

Miramar Pump Station CP Design, San Diego County Water Authority, CA:

Corrosion Engineer. RF Yeager Engineering provided a corrosivity assessment YEARS OF EXPERIENCE 28
YEARS WITH FIRM 21

EDUCATION
B.S., Civil Engineering, California
Polytechnic State University, 1997
Association for Materials Protection and
Performance (AMPP), formerly NACE Int’l
▪ Basic Corrosion Course, 1997
▪ CP Design I, 1999
▪ Cathodic Protection
Certification Training, 2001

CERTIFICATIONS
California Professional Civil Engineer
No. C70686
AMPP Cathodic Protection Specialist No. 6321
Confined Space Entrant/Attendee
Certified DVBE/SBE Firm
(CA Dept. of General Services)
Certified SLBE/ELBE Firm
(City of San Diego)
SCOOP Certified Firm (SDCWA)

PROFESSIONAL AFFILIATIONS
Association for Materials Protection and
Performance AMPP formerly NACE Int’l
▪ San Diego Section Chairman, 2002-
2003
▪ San Diego Section Trustee, 2003-
2006
93 Richard F. Yeager Jr., PE
1016 Broadway, Ste. A, El Cajon, CA 92021
Phone: 619.312.0195

concluding in a report with recommendations for corrosion control. Created a cathodic protection design which included reviewing standards, design analysis/calculations, redline markups to civil plan and profile drawings, final design details with response comments, corrosion control specifications, cost estimates, and attending project meetings.

Pure Water North City Water Reclamation Facility Expansion, City of San Diego, CA: Corrosion Engineer. RF Yeager Engineering conducted field testing and compiled project corrosivity report, which outlined corrosion control findings.

Recommended corrosion control measures included electrical isolation from other utilities, pipeline continuity, corrosion control for buried metallic pipelines, and the installation of corrosion monitoring test stations. Created a cathodic protection design, which included reviewing standards, design analysis/calculations, redline markups to civil plan and profile drawings, 60%, 90%, 100%, and final design details with response comments, corrosion control specifications, cost estimates, and attending project meetings.

Morena Pump Station and Conveyance System, City of San Diego, CA: Corrosion Engineer. RF Yeager Engineering prepared project corrosivity report, which outlined corrosion control findings. Recommended corrosion control measures included electrical isolation from other utilities, pipeline continuity, corrosion control for buried metallic pipelines, and the installation of corrosion monitoring test stations. Created a cathodic protection design, which included reviewing standards, design analysis/calculations, redline markups to civil plan and profile drawings, 60%, 90%, 100%, and final design details with response comments, corrosion control specifications, cost estimates, and attending project meetings.

Design of 30th Street Pipeline Replacement, City of San Diego, CA: Corrosion Engineer. RF Yeager Engineering prepared project corrosivity report, which outlined corrosion control findings. Recommended corrosion control measures included electrical isolation from other utilities, pipeline continuity, corrosion control for buried metallic pipelines, and the installation of corrosion monitoring test stations. Created a cathodic protection design, which included reviewing standards, design analysis/calculations, redline markups to civil plan and profile drawings, 60%, 90%, 100%, and final design details with response comments, corrosion control specifications, cost estimates, and attending project meetings.

Otay 2nd Pipeline Phase 1, Phase 2, and Phase 3, City of San Diego, CA:

Corrosion Engineer. RF Yeager Engineering is providing a cathodic protection design for the entire reach of the pipeline including open cut and trenchless sections. We conducted a soil corrosivity assessment and reported recommendations for corrosion control. The impressed current cathodic protection design for the buried metallic pipeline included reviewing standards, design analysis/calculations, redline markups to civil plan and profile drawings, providing 90%, 100%, and final design details with response comments, corrosion control specifications, and cost estimates. Additionally, we are providing construction support services.

▪ NACE Int’l Policy Committee 2006-
2018
▪ NACE Int’l Policy Chair 2012-2015
▪ NACE Int’l Policy Past Chair
2015-2018
American Society of Civil Engineers (ASCE)

*More Experience Available Upon
Request

94 Randy J. Geving, PE
1016 Broadway, Suite A, El Cajon, CA
92021 Phone: 619.312.0195

Randy J. Geving, PE

Senior Corrosion Engineer

Randy Geving has over thirty eight years of corrosion engineering experience in the water, wastewater, and oil & gas industries. Mr. Geving is a Registered Professional Corrosion Engineer and has served as engineering manager and lead project corrosion engineer for numerous water infrastructure projects. He has extensive experience in the design and installation of cathodic protection systems, condition assessment of met allic pipelines and concrete reinforced structures, metallic component failure analysis, and metallurgical materials selection for hydro processing and water/wastewater facilities.

Project Experience:

Failure Analysis / Condition Assessment
Responsible for assessing condition and/or cause of failure of pipelines, tanks, steel reinforced concrete and other components. The analysis consists of field inspections and tests ranging from ultrasonic thickness measurements, pit depth readings, soil analysis, and cathodic protection measure ments, and coating assessment. All test data, observations, conclusions and recommendations to prevent future failures are provided to the client in a report. ▪ Helix Water District – Corrosion & Coating Engineering Services 2016- 2020
▪ City of San Diego - 31 Potable Water Pipelines
▪ City Of Oceanside - Morro Hills No. 2 Reservoir
▪ Jurupa Community Services District – 18-Inch Steel Force Main ▪ City of San Diego – Programmatic Sewer Force Main
▪ City Of San Diego - North City To San Vicente Pipeline ▪ City of Vista - Buena Vista Pump Station/Jefferson Street Bridge ▪ Eastern Municipal Water District - TVRWRF Rotary Drum ▪ Goleta Water District - El Camino Well Downhole
Corrosion Program Management/Program Review
Responsible for defining, implementing and maintaining Municipality cathodic protection programs. Work includes reviewing and evaluating all existing corrosion control facilities for both piping and reservoirs, as well as defining and prioritizing future corrosion protection and monitoring needs to preserve the integrity of the systems.
▪ Olivenhain Municipal Water District
▪ Leucadia Wastewater District
▪ Otay Water District
▪ Ramona Municipal Water District
▪ San Dieguito Water District
▪ Santa Fe Irrigation
▪ Vallecitos Water District
▪ Rainbow Municipal Water District
▪ City of Sunnyvale
▪ Santa Margarita Water District
Cathodic Protection Data Collection/Analysis/Corrosion Support

YEARS OF EXPERIENCE
38 YEARS WITH FIRM
17 EDUCATION
B.S., Metallurgical Engineering,
California Polytechnic State University,
San Luis Obispo, 1987
National Association of Corrosion
Engineers (NACE Int’l)
▪ Cathodic Protection Theory

CERTIFICATIONS
California Registered Corrosion
Engineer No. CR-1060
NACE Int’l:
• CIP Level 1, No. 28714
Confined Space Entrant/Attendee

PROFESSIONAL AFFILIATIONS
Association for Materials Protection and
Performance (AMPP) formerly NACE Int’l

CONTACT INFORMATION
Phone: 760-715-2358
Email: [email protected]

95 Randy J. Geving, PE
1016 Broadway, Suite A, El Cajon, CA
92021 Phone: 619.312.0195

Responsible for conducting data collection and analysis of new and existing cathodic protection systems on buried metallic pipelines and steel storage tanks.

Newly installed facilities are inspected and tested to ensure compliance wi th project design documents. Testing on existing facilities identifies areas which require remedial measure in order to achieve or maintain the desired level of corrosion protection. Follow-up testing is often required to troubleshoot areas of low protection. This testing includes electrical continuity testing and stray current interference testing along selected reaches of pipeline. ▪ City of Oceanside - Guajome Reservoir Waterproofing Project ▪ City of Oceanside - Mesa Drive 24-inch Pipeline
▪ City of San Diego - Catalina Standpipe Replacement Project ▪ City of San Diego - Cathodic Protection of Critical Mains Project ▪ City of San Diego - Pacific Highlands Ranch PR Station Cathodic Protection Design
Responsible for designing new and retrofit cathodic protection systems for buried metallic pipelines and aboveground water storage tanks. Designs, galvanic anode and impressed current, take into account soil conditions, coating options, power availability and other parameters in order to achieve the most cost effective means of long term corrosion protection in accordance with nationally accepted standards.
▪ South Coast Water District - Submersible Pump Cathodic Protection Design
▪ City of San Diego - NCW Reclamation Plant Expansion
▪ City of San Diego - City Pure Water Facility
▪ City of San Juan Capistrano - Calle Pinon Pressure Reducing Station Replacement Project
▪ Olivenhain Municipal Water District – Rancho Santa Fe Road Cathodic Protection Retrofit
Corrosivity Assessment
Conduct in-situ corrosion assessments along pipeline alignment or project site to determine aggressiveness of soil to buried metallic utilities. Assess stray current interference risk from foreign utilities. Review project geotechnical data, including soil sample analysis data pertaining to soluble sal t content, pH and resistivity. Provide client with summary report which includes all pertinent data, conclusions and recommendations in order to minimize the risk of future leaks on utilities due to external corrosion.
▪ Coachella Valley Water District – North Shore Water Main ▪ Coachella Valley Water District – Reservoir 4602-2
▪ City of San Diego – North City Pure Water Facility Expansion ▪ City of San Diego – Otay 2nd Pipeline Phase 1, 2, and 3 ▪ City of San Diego – Cielo and Woodman Pump Station
▪ City of Corona – Home Gardens Water Transmission Pipeline ▪ City of Ontario/Upland - Pipeline Project
▪ City of Poway – Liguori Reservoir
▪ Jurupa Community Services District - 24-inch Force Main Project Thermal Resistivity Assessment
Testing is conducted in the field or in a laboratory from samples of soil varying densities and moisture contents. Testing is conducted in general accordance with the standard method ASTM D5334 -08 which calculates thermal resistivity by monitoring the dissipation of heat from a line heat source. Data and conclusions are provided to the client is a summary technical memo. ▪ Solar Gen II Project
▪ Imperial Valley Solar Company 2 - Solar Farm project
▪ Imperial Irrigation District - Highline Substation project ▪ Dixieland Solar East & West Project

More Experience Available Upon
Request
96 Copyright © 2025 Kennedy/Jenks Consultants, Inc.

Contact Information
Jeff Savard, PE
Principal-In-Charge/Project Manager
(805) 973-5719
Oxnard Office
2775 North Ventura Road, Suite 202
Oxnard, CA 93036
B001830*34275
97 City of Simi Valley
Agreement No. 3260002
Kennedy Jenks Consultants, Inc.

Page 14 of 14 ends

WATER2510.CON.MG RFP No. PW 25-01

EXHIBIT “B”

SCHEDULE OF FEES
98 City of Simi Valley/Ventura County Waterworks
District No. 8
Stow Tank No. 1 Replacement -
CP76300057
RFP No. PW 25-01 Part 2 - Cost Proposal | June 2, 2025
99 2775 North Ventura Road, Suite 202 | Oxnard, CA 93036 (805) 973-5719 | [email protected]
g:\market\pro\simivalley\stow tank replacement\updated cost proposal\stow tank cost letter proposal_updated.docx 30 June 2025
Marcos Ferreccio, MS, PE
Associate Engineer
Ventura County Waterworks District No. 8
2929 Tapo Canyon Road
Simi Valley, CA 93063
Subject: Cost Proposal for Engineering Services for Stow Tank No. 1 Replacement Project RFP No. PW 25-01

Dear Mr. Ferreccio:

Kennedy/Jenks Consultants Inc. (KJ) is pleased to present this Cost Proposal to accompany our Technical Proposal for providing engineering services for the Stow Tank No. 1 Replacement Project.

Enclosed is our fee estimate as well as our Schedule of Charges for the scope outlined in the District’s RFP and our Technical Proposal.

The fee estimate includes a breakdown of the hours and costs by scope task and by team member.

Charges for subconsultants and travel expenses are also included at cost without markup in accordance with the District’s RFP requirements.

As shown on the fee estimate, the total cost is estimated to be $477,689 for engineering services for pre-design, final design and bidding services.

There are several items not included in our fee estimate that should be noted:
- Survey/mapping of the entire site covering all 4 tanks is not included. Only the area covering Tank No. 1 was included since we are not anticipating design of any improvements beyond the footprint of Tank No. 1. If the District is interested in survey/mapping of the entire site covering all 4 tanks, an additional $7,480 is required for our survey subconsultant. - Obtaining a title report for the District’s tank site is not included. Due to lack of information available in this area, our survey subconsultant was unable to obtain a cost or proposal from a title company. It is also not clear as to whether or not we need a title report based on the proposed improvements. If the District is interested in obtaining a title report for the property, we anticipate the additional cost to not be more than $5,000. - Sampling and testing existing tank coatings for lead is not included. If the District does not have information on the existing coatings for Tank No. 1 and if it is determined that sampling and testing for lead is required, an additional $1,500 is required for a specialty subcontractor (ie., CSI Services) to provide sampling/testing services.
100

Marcos Ferreccio, MS, PE
Ventura County Waterworks District No. 8
30 June 2025

Page 2 ends

g:\market\pro\simivalley\stow tank replacement\updated cost proposal\stow tank cost letter proposal_updated.docx We appreciate the opportunity to present our Cost Proposal to the District. Please contact us if you have any questions or need additional information.

Very truly yours,

KENNEDY JENKS CONULTANTS

Jeff Savard, PE
Vice President
Enclosures

101

Client/Address: City of Simi Valley/Ventura County Waterworks District No. 8 2929 Tapo Canyon Road
Simi Valley, CA 93063

Contract/Proposal Date: June 2, 2025
Schedule of Charges January 1, 2024

PERSONNEL COMPENSATION
Classification Hourly Rate
Engineer-Scientist-Specialist 1 ............................................................................ $155 Engineer-Scientist-Specialist 2 ............................................................................ $190 Engineer-Scientist-Specialist 3 ............................................................................ $210 Engineer-Scientist-Specialist 4 ............................................................................ $230 Engineer-Scientist-Specialist 5 ............................................................................ $250 Engineer-Scientist-Specialist 6 ............................................................................ $275 Engineer-Scientist-Specialist 7 ............................................................................ $300 Engineer-Scientist-Specialist 8 ............................................................................ $320 Engineer-Scientist-Specialist 9 ............................................................................ $335 Senior CAD-Designer .......................................................................................... $195 CAD-Designer ..................................................................................................... $180 Senior CAD-Technician ....................................................................................... $165 CAD-Technician .................................................................................................. $145 Project Assistant ................................................................................................. $145 Administrative Assistant ...................................................................................... $130 Direct Expenses
Reimbursement for direct expenses, as listed below, incurred in connection with the work, will be at cost for items such as:
a. Maps, photographs, 3rd party reproductions, 3rd party printing, equipment rental, and special supplies related to the work.
b. Consultants, soils engineers, surveyors, contractors, and other outside services. c. Rented vehicles, local public transportation and taxis, travel and subsistence. d. Project specific telecommunications and delivery charges. e. Special fees, insurance, permits, and licenses applicable to the work. f. Outside computer processing, computation, and proprietary programs purchased for the work.

Reimbursement for vehicles used in connection with the work will be at the federally approved mileage rates or at a negotiated monthly rate.

If prevailing wage rates apply, the above billing rates will be adjusted as appropriate.

Overtime for non-exempt employees will be billed at one and a half times the Hourly Rates specified above.

Rates for professional staff for legal proceedings or as expert witnesses will be at rates one and one-half times the Hourly Rates specified above.

Excise and gross receipts taxes, if any, will be added as a direct expense. 102
Proposal Fee Estimate
Savard - PM Barraza - PE Tarbell - QC Honda - QC Tran - CE aiyaz Mohamm e EI&C CAD Name 2 Name 1 Name Cad Name Cad Name Cad Name Cad Name PA Name Adm Symonds - QC Hoepfl - EE Larsen - PC Devlin - QC Stobaugh - DPM Name January 1, 2024 Rates KJ Sub Sub Sub KJ
+
Classification:

Eng-Sci-9
Eng-Sci-8
Eng-Sci-7
Eng-Sci-6
Eng-Sci-5
Eng-Sci-5
Eng-Sci-3
Eng-Sci-2
Eng-Sci-1
Sr. CAD-
Design
CAD-Design
Sr. CAD-
Tech
CAD-Tech
Project
Assistant
Admin.

Assist.

Eng-Sci-8
Eng-Sci-5
Eng-Sci-8
Eng-Sci-7
Eng-Sci-5Total
Labor
B&C
Yeh
Yeager
ODCs
Total
Labor
Total
Subs
Total
Expenses
Total Labor +
Subs +
Expenses
Hourly Rate: $335 $320 $300 $275 $250 $250 $210 $190 $155 $195 $180 $165 $145 $145 $130 $320 $250 $320 $300 $250 Hours Fees Fees Fees Fees Fees Fees A - Project Management (PM)
01 PM - Project Initiation (and kickoff meeting) 430020000000040020030 1 8 $ 4 , 6 3 0 $ 0 $ 4 , 6 3 0 $ 0 $ 0 $ 4 , 6 3 0 02 PM - Monitoring and Tracking (12M) 6000000000000000000 1 80 2 4 $ 6 , 5 1 0 $ 0 $ 6 , 5 1 0 $ 0 $ 0 $ 6 , 5 1 0 03 PM - Monthly Reports and Invoicing (12M) 6000000000000 1 20000000 1 8 $ 3 , 7 5 0 $ 3 , 7 5 0 $ 0 $ 0 $ 3 , 7 5 0 04 PM - District Bi-Weekly Meetings (virtual, 10M - 22 total) 11 11 22 $7,205 $7,205 $0 $0 $7,205 PM - Subtotal 2 7 1 400200000000 1 600200 2 10 8 2 $22,095 $0 $0 $0 $0 $22,095 $0 $0 $22,095 A - Quality Control (QC)
01 QC - Quality Management 200000000000000000020 4 $ 1 , 1 7 0 $ 0 $ 1 , 1 7 0 $ 0 $ 0 $ 1 , 1 7 0 02 QC - Milestone Reviews 11 2 4 1 110000000000 2 810 1 390 8 9 $26,490 $0 $26,490 $0 $0 $26,490 QC - Subtotal 31 2 4 1 110000000000 2 810 1 3 1 10 9 3 $27,660 $0 $0 $0 $0 $27,660 $0 $0 $27,660 B - Pre-Design Services
01 Pre-Design - Data Collection & Review (and site visit) 2 1 200 2 006000000000800 1 40 6 2 $16,270 $1,000 $16,270 $0 $1,000 $17,270 02 Pre-Design - Subconsultants (survey and geotech) 220020000000000000000 6 $ 1 , 8 1 0 $ 9 , 0 2 0 $53,444 $0 $0 $1,810 $62,464 $0 $64,274 Pre-Design - Subtotal 4 1 400 2 206000000000800 1 40 6 8 $18,080 $9,020 $53,444 $0 $1,000 $18,080 $62,464 $1,000 $81,544 C - Preliminary Design Services (PD)
01 PD - 30% Design Development 6 1 621 6 9 6 1 2 2004 4 60 8 3000 4 537 1 90 3 8 5 $85,515 $0 $85,515 $0 $0 $85,515 02 PD - PDR/BODR 6 1 200 1 200000000000 1 260 2 00 6 8 $18,770 $0 $18,770 $0 $0 $18,770 03 PD - Deliverable Preparation 000011000000000010020 5 $ 1 , 2 5 0 $ 0 $ 1 , 2 5 0 $ 0 $ 0 $ 1 , 2 5 0 04 PD - Respond to Client Comments 100011000000000010010 5 $ 1 , 3 3 5 $ 0 $ 1 , 3 3 5 $ 0 $ 0 $ 1 , 3 3 5 PD - Subtotal 1 3 2 821 8 3 6 3 2 2004 4 60 8 3000 5 997 4 20 4 6 3 $106,870 $0 $0 $0 $0 $106,870 $0 $0 $106,870 C - Final Design Services (FD)
01 FD - Coordination 770070000000000070070 3 5 $ 9 , 8 3 5 $ 0 $ 9 , 8 3 5 $ 0 $ 0 $ 9 , 8 3 5 02 FD - 60% Design 3 1 320 3 3 6 9 1 3004 5 50 3 9000 2 523 2 10 2 8 3 $63,709 $0 $63,709 $0 $0 $63,709 03 FD - 90% Design 5 1 220 3 7 7 3 1 5002 5 50 3 8000 3 324 2 50 3 0 5 $69,334 $0 $69,334 $0 $0 $69,334 04 FD - 100% Design 3 1 010 2 7 3 5 1 5002 2 80 3 1000 2 82460 1 9 3 $43,653 $0 $43,653 $0 $0 $43,653 05 FD - Deliverable Preparation 000033000000000030060 1 5 $ 3 , 7 5 0 $ 0 $ 3 , 7 5 0 $ 0 $ 0 $ 3 , 7 5 0 06 FD - Respond to Client Comments 400044000000000040040 2 0 $ 5 , 3 4 0 $ 0 $ 5 , 3 4 0 $ 0 $ 0 $ 5 , 3 4 0 07 FD - Subconsultants (corrosion/cathodic protection) 240000000000000000000 6 $ 1 , 9 5 0 $ 0 $ 0 $21,980 $0 $1,950 $21,980 $0 $23,930 FD - Subtotal 2 5 4 661 1 1 1 1 8 4 4 3008 1 3 80 1 0 9000 1 0 15 1 1 7 00 8 5 7 $197,571 $0 $0 $21,980 $0 $197,571 $21,980 $0 $219,551 D - Bid Services (BID)
01 BID - Pre-Bid Meeting 4 4 $1,340 $1,340 $0 $0 $1,340 02 BID - Bidder Questions 84 48 24 $6,560 $6,560 $0 $0 $6,560 03 BID - Prepare Addenda 240040000000400040040 2 2 $ 5 , 5 3 0 $ 0 $ 5 , 5 3 0 $ 0 $ 0 $ 5 , 5 3 0 04 BID - Conformed Documents 040040000000 1 204020060 3 2 $ 6 , 5 4 0 $ 0 $ 6 , 5 4 0 $ 0 $ 0 $ 6 , 5 4 0 BID - Subtotal 6 1 600 1 20000000 1 6040 1 000 1 80 8 2 $19,970 $0 $0 $0 $0 $19,970 $0 $0 $19,970 All Phases Total 78 119 32 13 231 247 71 0 0 12 184 0 208 16 4 28 181 14 31 176 0 1645 $392,245 $9,020 $53,444 $21,980 $1,000 $392,245 $84,444 $1,000 $477,689 G:\MARKET\PRO\SimiValley\Stow Tank Replacement\Updated Cost Proposal\Simi Stow Tank_Fee Estimate_Detailed Design-20251_Final_Updated © 2008 Kennedy/Jenks Consultants, Inc. 103
Copyright © 2025 Kennedy/Jenks Consultants, Inc.

Contact Information
Jeff Savard, PE
Principal-In-Charge/Project Manager
(805) 973-5719
Oxnard Office
2775 North Ventura Road, Suite 202
Oxnard, CA 93036
B001830*34275
104

CITY BOUNDARY
STOW #I TANK

PROJEC,T LOGATION
t -�-
I

VICINITY MAP
STOW #1 TANK SITE
118 FREEWAY

LOCATION MAP
ROBHERR/STOW....EXHIBIT.DWG

ATTACHMENT A
105