City of Simi Valley
Staff Report
September 28, 2026
To: City Council
From: Public Works Department
Jay Spurgin, Interim Public Works Director
Subject: Approve the second contract amendment with Burns Engineering, Inc., in the amount of $86,163.34, for professional construction management support services for the Battery Electric Bus Charging Infrastructure Project, RFP No.
PW 25-02
Staff Recommendation
It is recommended that the City Council:
1. Approve the second contract amendment (Attachment A) to the Professional Services Agreement with Burns Engineering, Inc. (Burns Engineering) to include professional construction management support services for the Battery Electric Van Charging Infrastructure Project, in an amount of $86,163.34, increasing the total contract amount from $406,523.73 to $492,687.07; and
2. Authorize the City Manager to approve subsequent contract amendments to incorporate future budgeted funds into the contract amount.
Background
The City is undertaking two Battery Electric Vehicle charging infrastructure projects: one for six (6) battery electric buses (BEBs) and another for seven (7) battery electric vans (BEVs). For the six (6) BEBs charging infrastructure project, the City entered into a Professional Services Agreement with Burns Engineering on February 23, 2026, in an amount not to exceed $396,564.71 for professional architectural and engineering design and construction management services. The City also approved a $53,435.29 contingency fund to cover unforeseen costs and authorized the City Manager to approve amendments up to a total contract amount of $450,000. On July 6, 2026, the City executed the first contract amendment with Burns Engineering in the amount of $9,959.02 to include evaluation of an interim off-grid electric vehicle charging solution for the six (6) BEBs, increasing the contract amount to $406,523.73.
For the seven (7) BEVs charging infrastructure project, the City contracted with Siemens Industry, Inc., utilizing a Sourcewell Cooperative Contract, to coordinate with Southern California Edison (SCE) on the electrical infrastructure design. Siemens Industry, Inc. has primarily performed this work through its subcontractor, Linkture Corp. The City has completed the design for the seven (7) BEVs charging infrastructure, procured the Electric Agenda Item No.
Consent (2)
Vehicle Supply Equipment (EVSE), and is finalizing the bid documents for solicitation of a construction contractor.
To support the construction phase of the seven (7) BEVs charging infrastructure project, the City proposes to amend its existing Professional Services Agreement with Burns Engineering to include professional construction management support services for the BEV charging infrastructure project. The proposed second contract amendment, in the amount of $86,163.34, would increase the total contract amount from $406,523.73 to $492,687.07.
Discussion
As the seven (7) BEVs charging infrastructure project enters construction, professional construction management support services are required to oversee the installation of the electric vehicle charging equipment and coordinate with the construction contractor, SCE, EVSE supplier, and other project stakeholders.
The City's experience with the electric vehicle infrastructure projects has shown that coordination among multiple consultants, the utility provider, equipment suppliers, and rebate programs can be challenging and may result in delays. Burns Engineering has already completed the electrical infrastructure and electrical demand analysis for the City's electric vehicle charging buildout, performed the transit facility yard evaluation, and has been closely involved in coordination with SCE regarding the City's electrical service and transformer upgrades. Having Burns Engineering provide construction management support for the seven (7) BEVs charging infrastructure project will ensure continuity and establish a single point of technical coordination for the City's related electric vehicle infrastructure.
Staff therefore recommends adding the construction management support services for the seven (7) BEVs charging infrastructure to the City's existing Professional Services Agreement with Burns Engineering. This approach is expected to improve communication and coordination, reduce duplication of effort, and minimize potential delays during construction.
Burns Engineering has submitted a proposal in the amount of $86,163.34 for the additional construction management support services for the seven (7) BEVs charging infrastructure project. The proposed services include review of bid document specifications, a pre-construction and kick-off meeting, construction management support before and after contract award, review of Requests for Information, material and equipment submittals, design clarifications, construction compliance, contract issues, EVSE commissioning, charging management system integration, and related technical coordination.
The proposed second contract amendment will increase the Burns Engineering contract from $406,523.73 to $492,687.07. The proposed amendment represents approximately
21.7% of the initial contract amount. Burns Engineering’s initial agreement was for design 2 and construction management services for the six (6) BEBs charging infrastructure project.
In accordance with City Purchasing Ordinance Chapter 9, Article 1, Section 2-9.110(c), City Council approval is required for this amendment because it exceeds the City Manager’s authority to approve amendments up to 10% of the original contract amount or $100,000, whichever is less, when the additional work is reasonably related to the original scope of work. The proposed amendment adds construction management support services for the separate seven (7) BEVs charging infrastructure project.
Therefore, staff recommends that the City Council approve the second contract amendment in the amount of $86,163.34, increasing the total contract amount to $492,687.07.
Staff also recommends authorizing the City Manager to approve subsequent contract amendments to incorporate future budgeted funds into the contract amount.
Financial Impact
The cost of this action was included in the FY 2025-26 Adopted Budget under the Electric Vehicles Infrastructure Project, CP75000014, RFP No. PW 25-02. The project funding was carried forward to FY 2026-27 and is available for this action. The City will utilize Senate Bill 125 funding to support this action. No appropriation is required. This action has no impact on the City’s General Fund.
City Council Priority
This item supports the Reliable Infrastructure Pillar of Excellence.
Suggested Motion
I move to:
1. Approve the second contract amendment to the Professional Services Agreement with Burns Engineering to include professional construction management support services for the BEVs Charging Infrastructure Project, in an amount of $86,163.34, increasing the total contract amount from $406,523.73 to $492,687.07; and
2. Authorize the City Manager to approve subsequent contract amendments to incorporate future budgeted funds into the contract amount.
Summary
The City is undertaking two Battery Electric Vehicle charging infrastructure projects: one for six (6) BEBs and another for seven (7) BEVs. For the six (6) BEBs charging infrastructure project, the City entered into a Professional Services Agreement with Burns Engineering on February 23, 2026, in an amount not to exceed $396,564.71 for professional architectural and engineering design and construction management services. The City also approved a $53,435.29 contingency fund to cover unforeseen 3 costs and authorized the City Manager to approve amendments up to a total contract amount of $450,000. On July 6, 2026, the City executed the first contract amendment with Burns Engineering in the amount of $9,959.02 to include evaluation of an interim offgrid electric vehicle charging solution for the six (6) BEBs, increasing the contract amount to $406,523.73. It is recommended that the City Council approve the second contract amendment to the Professional Services Agreement with Burns Engineering to include professional construction management support services for the BEVs Charging Infrastructure Project, in an amount of $86,163.34, increasing the total contract amount from $406,523.73 to $492,687.07. Additionally, staff recommends that the City Council authorize the City Manager to approve subsequent contract amendments to incorporate future budgeted funds into the contract amount.
Prepared by: Gian Maria Garcia, Management Analyst
Attachments
Attachment A – Second Contract Amendment
4 SECOND AMENDMENT TO
AGREEMENT NO. 3260082 BETWEEN
THE CITY OF SIMI VALLEY AND
BURNS ENGINEERING, INC.
THIS SECOND AMENDMENT (“Amendment”) is made and entered into this 28th day of September, 2026, by and between the CITY OF SIMI VALLEY, a general law city and municipal corporation (“CITY”), and BURNS ENGINEERING, INC., a Pennsylvania corporation, ("CONSULTANT").
1. Pursuant to Section 35 of Agreement No. 3260082 (“Agreement”), Section 1, Section 2, Section 4, Section 8, and Section 11 are amended to read as follows:
1. CONSIDERATION
A. As partial consideration, CONSULTANT agrees to perform the work listed in the SCOPE OF SERVICES below;
B. As additional consideration, CONSULTANT and CITY agree to abide by the terms and conditions contained in this Agreement;
C. As additional consideration under this Second Amendment, CITY agrees to pay CONSULTANT an amount not to exceed Eighty-Six Thousand One Hundred Sixty-Three Dollars and Thirty-Four Cents ($86,163.34), for a total CONTRACT amount not to exceed Four Hundred Ninety-Two Thousand Six Hundred Eighty-Seven Dollars and Seven Cents ($492,687.07) for CONSULTANT’s services. CITY may modify this amount as set forth below. Unless otherwise specified by written amendment to this Agreement, CITY will pay CONSULTANT as specified in the Attached Exhibit “B” (Schedule of Fees), Exhibit “A-1” (Off-Grid Electric Vehicle (EV) Charging Solution), and Exhibit “A-2” (Construction Management Support Services (CMSS) Phase 1), which are incorporated by reference.
2. SCOPE OF SERVICES
A. CONSULTANT will perform services listed in the attached Exhibit “A” (Scope of Work), Exhibit “A-1” (Off-Grid Electric Vehicles (EV) Charging Solution), and Exhibit “A-2” (Construction Management Support Services (CMSS) Phase 1), which are incorporated by reference.
B. CONSULTANT will, in a professional manner, furnish all of the labor, technical, administrative, professional and other personnel, all supplies and materials, equipment, printing, vehicles, transportation, office space and facilities, and all tests, testing and analyses, calculation, and all other 5 means whatsoever, except as herein otherwise expressly specified to be furnished by CITY, necessary or proper to perform and complete the work and provide the professional services required of CONSULTANT by this Agreement.
4. PAYMENTS. CITY will pay CONSULTANT in accordance with the schedule of fees in Exhibit “B,” Exhibit “A-1,” and Exhibit “A-2.” For CITY to pay CONSULTANT as specified by this Agreement, CONSULTANT must submit a detailed invoice to CITY which lists the hours worked and hourly rates for each personnel category and reimbursable costs (all as set forth in Exhibit “A,” Exhibit “A-1,” and Exhibit “A-2”) the tasks performed, the percentage of the task completed during the billing period, the cumulative percentage completed for each task, the total cost of that work during the preceding billing month and a cumulative cash flow curve showing projected and actual expenditures versus time to date.
8. TERM. The term of this Agreement will be from February 23, 2026, to August 22, 2028. Unless otherwise determined by written amendment between the parties, this Agreement will terminate in the following instances:
A. Completion of the work specified in Exhibit “A-Scope of Work,” and Exhibit “A-1-Off-Grid Electric Vehicle (EV) Charging Solution,” and Exhibit A-2- Construction Management Support Services (CMSS) Phase 1.” B. Termination as stated in Section 16.
11. CONSISTENCY. In interpreting this Agreement and resolving any ambiguities, the main body of this Agreement takes precedence over the attached Exhibits; this Agreement supersedes any conflicting provisions. Any inconsistency between the Exhibits will be resolved in the order in which Exhibits appear below:
Exhibit “A” – Scope of Work
Exhibit “B” – Schedule of Fees
Exhibit “A-1” – Off-Grid Electric Vehicle (EV) Charging Solution Exhibit “A-2” – Construction Management Support Services (CMSS) Phase 1
2. ELECTRONIC SIGNATURES. This Amendment may be executed by the Parties on any number of separate counterparts, and all such counterparts so executed constitute one Amendment binding on all the Parties notwithstanding that all the Parties are not signatories to the same counterpart. In accordance with Government Code §16.5, the Parties agree that this Amendment will be considered signed when the signature of a party is delivered by electronic transmission. Such electronic signatures will be treated in all respects as having the same effect as an original signature.
3. Except as modified by this Amendment, all other terms and conditions of Agreement No. 3260082 remain the same.
6 [SIGNATURES ON NEXT PAGE]
7 IN WITNESS WHEREOF the parties hereto have executed this contract the day and year first hereinabove written.
Attest: City of Simi Valley, A Municipal Corporation
By:
Lucy Blanco, City Clerk Dee Dee Cavanaugh, Mayor of the City of Simi Valley, California
Approved as to Form: Burns Engineering, Inc.
Algeria R. Ford, City Attorney By:
Print Name: Tony Koltuv
Approved as to Content:
Title: Senior Vice President, Railroad & Transit
Samantha C. Argabrite, City Manager By:
Print Name: Bernard Carolan
Johanna Medrano, Title: Chief Financial Officer & Vice President Deputy Administrative Services Director/
Budget & Purchasing
Jay Spurgin,
Interim Public Works Director
8 Exhibit A – Scope of Work
A. Professional Architectural and Engineering Design.
The Consultant is expected to provide professional architectural and engineering design for the EV infrastructure for the City’s fixed-route bus fleet at the Transit Maintenance Facility, 490 W. Los Angeles Avenue, Simi Valley, CA 93065. The City also plans to incorporate a microgrid, featuring solar panels and storage batteries, to enable future full or partial energy independence from the grid. Designs should be developed in a manner that accommodates, or has the flexibility to accommodate, the potential integration of this future enhancement. The expected completion date of the Design is 180 calendar days from the contract’s effective date.
1. TMF Site
a. Electrical infrastructure and electrical demands analysis for buildout • Prepare an evaluation of initial incremental buildout of the City of Simi Valley’s first six (6) battery electric fixed-route buses for the charging needs and site operations
• Develop electrical capacity maximum needed, evaluating the bus charging infrastructure separate from the current facility electrical needs
• Deliverable: Technical Memo #1, which provides the electric demand analysis and charging infrastructure recommendations for TMF b. ZEB fleet and electric charging system analysis
• Provide analysis and architectural design of ZEB charging infrastructure to support the installation of five (5) additional charging units for the remaining battery electric fixed-route buses as part of the future expansion of the Project
• Provide analysis and inclusion of a “smart” Charge Management System (CMS) products (see Appendix C); prepare a Request for Proposal to solicit for CMS vendors and make recommendation to the City. NOTE: the City reserves the right to conduct its own competitive process and is not obligated by the recommendation of the Consultant • Deliverable: Technical Memo #2, which provides a comprehensive review of CMS product offerings, including criteria from Appendix C and supporting vendor documentation in an appendix, and recommend vendor that meets the City’s standards
Docusign Envelope ID: B8FA0C8C-B2BB-4A27-AF36-4FFA09D7BF2C 9 c. Southern California Edison (SCE) Charge Ready Program and upgrades • Consultant will work with SCE to negotiate participation in the Charge Ready Program and to obtain the maximum financial support from the program
• Consultant will work with SCE to determine necessary upgrades and reasonable timeframe to upgrade the service to TMF
• Deliverables:
Documentation of meeting with SCE regarding actions to be taken on necessary upgrades and established timeframe for TMF upgrade
Documentation of meeting with SCE regarding negotiation to participate in the Charge Ready Program, and to obtain the maximum financial support
Prepare any forms and agreements between City and the SCE Charge Ready Program as required
2. TMF Site Evaluation and Bus Bay Parking and Electric Vehicle (EV) Charging Optimization Plan
a. Develop optimal site plan for electrical service equipment location to ensure easy and safe bus and paratransit vehicle access to both fast and slow charging solution. The plan will also include:
• Switchgear
• Back-up generator
• Trenching
• Bus parking
• Charging station islands
b. Technical Memo and Presentation
• Prepare the above referenced plan and draft a technical memo with a final plan, including a presentation to the City
• Deliverables:
30% Design recommendations and technical memo
(evaluation of alternative site plans) for the City’s review; 80% Design plans, specification, and construction cost estimate for the City’s review.
c. Prepare Plans, Specifications, and Estimates (PS&E) Package • Prepare a PS&E Package for the construction and placement of charging infrastructure at TMF.
Docusign Envelope ID: B8FA0C8C-B2BB-4A27-AF36-4FFA09D7BF2C 10 • PS&E Package are not deemed complete or final until the City and all applicable reviewing agencies provides their final approval • Requirements for the final plans:
24” x 36”, wet-signed by Consultant’s registered engineer All Design CAD files (including, but not limited to, drawing, external references, blocks, fonts, pens styles, etc.) must be provided to the City
PS&E Package must be submitted in electronic format (i.e., Word, Excel, or PDF)
• Deliverables:
Final technical study and layouts;
Final PS& E design submittal for construction bid package.
Consultant must provide the City with one set of reproducible drawings and specifications, along with electronic copies of the 100% construction documents.
4. Project Manager
Consultant must assign a Project Manager, who will perform project management and administration activities throughout the course of the Design, as defined in the following:
a. Supervise, coordinate, and monitor Design development; b. Perform design and engineering to develop Project’s construction contract documents, including electrical and civil engineering;
c. Perform research, reviews, studies, and condition assessments; d. Identify, evaluate, and develop the scope of work, and prepare complete construction bid package (on City boilerplate), including electrical and civil engineering components for the installation of six (6) battery electric bus charging infrastructure;
e. Assist in reviewing prospective contractors’ proposals and provide feedback or recommendations to City staff;
f. Coordinate and attend periodic update meetings with City’s project manager and coordinators to identify and develop a plan of action and a timely schedule;
g. Ensure compatibility and functioning of all electric charging systems with the battery electric buses and paratransit vehicles acquired by the City in the FY25/26 period.
B. Construction Management Services.
The Consultant is expected to provide construction management services to support the implementation of the Project required for the six (6) electric fixed-route buses. The term for this Service is up to two (2) years, with an option for one-year extension, and will be effective at the start of the construction activities.
Docusign Envelope ID: B8FA0C8C-B2BB-4A27-AF36-4FFA09D7BF2C 11 1. Project Manager
Consultant must assign a Project Manager, who will perform construction management services throughout the course of the Service, as defined in the following:
a. During implementation and notice of completion of the Project, serve as contact and construction manager for the installation of electric charging infrastructure and CMS;
b. Provide overall management of consultant and construction contracts, including design, bid & award, and construction phase of projects, to include the approval of deliverables, setting and monitoring schedule and budget milestones, review of invoicing and progress pay estimates, work progress, document meetings, and overall quality assurance in consultation with City’s project manager;
c. Assist City staff to prepare preliminary cost estimates, Staff Reports, task orders, professional services, construction contracts, amendments, and change orders;
d. Perform other miscellaneous tasks related to the Project, as requested by the City;
e. Coordinate and attend periodic update meetings with City’s project manager to identify and develop a plan of action and a timely schedule.
Docusign Envelope ID: B8FA0C8C-B2BB-4A27-AF36-4FFA09D7BF2C 12 EXHIBIT B – SCHEDULE OF FEES
Docusign Envelope ID: B8FA0C8C-B2BB-4A27-AF36-4FFA09D7BF2C 13 Exhibit B - Schedule of Fees
Docusign Envelope ID: B8FA0C8C-B2BB-4A27-AF36-4FFA09D7BF2C 14 June 4, 2026
To: The City of Simi Valley
Attn: Ben Gonzales
2929 Tapo Canyon Road
Simi Valley, CA 93063
Re: Off-Grid Electric Vehicle (EV) Charging Solution Change Order Dear Ben Gonzales:
In response to the email request dated 5/15/2026, Burns Engineering is pleased to present a quote to provide support for the off-grid charging solution. This charging solution is meant to bridge the time between the six (6) NewFlyer Xcelsior 35’ buses delivery in May 2026 and the completion of the SCE Charge Ready Transport construction project, which is currently expected to complete in 12 – 24 months. Per the Biweekly Meeting on 5/27/2026, Burns Engineering will focus efforts to connecting the off-grid charging solution to the existing Natural Gas infrastructure on site.
Burns Engineering will provide:
1) Burns Engineering will coordinate with a plumber (coordinated in collaboration with one of the off-grid charging vendors) to determine the feasibility, connection point to the existing Natural Gas system, and ideal location for placing the off-grid generator to power the chargers.
2) A cover letter to Ventura County Air Quality Management District (VC AQMD) detailing the scope of work to connect a natural gas generator to the existing Natural Gas system on site, generator engine specifications, total size and output, annual fuel usage, total power output, reason why the grid power cannot be used, description of other locations in Southern California that have installed or are utilizing a similar charging system, and associated permits for those projects.
3) A technical memo providing a comprehensive review of the different off-grid charging solutions and their ability to support the needs of Simi Valley Transit. a. The solutions presented to Simi Valley Transit are expected to charge two (2) buses per day over the course of one (1) shift and six (6) days per week. b. All off-grid charging solutions proposed will be connected to the Natural Gas system on site. Any solutions requiring an external fuel source (Compressed Natural Gas (CNG) Tank, Propane Tanks, Liquified Natural Gas (LNG) Tanks, etc) for the generator will require an additional permit from the Ventura County Fire Department.
c. The solution will be presented in a conceptual site plan using an aerial photo showing the ideal location of the generator and the two buses that will be charged. 4) Burns Engineering will provide utility coordination services on behalf of Simi Valley Transit with SoCal Gas to ensure the infrastructure can support an off-grid charging solution. The off-grid charging solution will be located near the existing Natural Gas infrastructure but final location to be determined.
Exhibit A-1 - Off-Grid Electric Vehicle (EV) Charging Solution 15 15
Selected Off-grid Charging Vendor (Vendor) will provide:
1) Upon approval of the cover letter by VC AQMD, Vendor will submit an Authority to Construct Application and Natural Gas Engine Supplemental form (if Natural Gas is selected) for each engine requested to be permitted to the VC AQMD Engineering department.
2) Vendor, in collaboration with Burns, will provide a plumber to conduct a thorough assessment of the existing Natural Gas infrastructure on site, ensuring pricing to physically connect the off-grid charging solution to the existing Natural Gas infrastructure.
If it is decided that no connection is needed or another fuel source selected, this will not be included in the Vendor’s final proposal to Simi Valley Transit. 3) Vendor will be responsible for coordinating directly with Simi Valley Transit on all training, deployment, energization, and site breakdown activities of the off-grid charging solution.
Simi Valley Transit will provide:
1) SVT will submit the payment filing fee of $450 paid via check or online via ECheck or credit card on the VC AQMD website.
Schedule:
- Burns will submit a copy of the draft cover letter to Simi Valley Transit five (5) business days after Simi Valley Transit provides Burns with acceptance and written direction to proceed. Burns will submit the final cover letter to VC AQMD three (3) business days of receiving comments from Simi Valley Transit.
- Burns will provide the technical memo to Simi Valley Transit ten (10) business days after the cover letter has been transmitted to VC AQMD.
Pricing:
Assumptions and Exclusions:
- Burns Engineering will not provide design or construction documents for this effort as none are required beyond the site plan and applications listed above. - Change order assumes that Simi Valley Transit will provide one (1) round of comments within (5) business days on the cover letter before submission to VC AQMD. - Change order assumes a maximum of one (1) round of comments from the VC AQMD. - All meetings with Burns are to be assumed virtual and updates to be shared during existing standing meetings with Simi Valley Transit (every other Thursday at 10 AM).
Vendor will be responsible for visiting site once (1) prior to installation to confirm parking 16 layout and Natural Gas infrastructure on site (if option to pursue an interconnection with the existing Natural Gas infrastructure is selected).
- Change Order is a supplement to Project PW 25-02 and that work will be performed and invoiced under the master contract terms and general project scope and assumptions provided in our amended proposal dated January 09, 2026.
Sincerely,
Burns Engineering, Inc.
John Kessler
Deputy Project Manager
2026-0058
17 July 30, 2026
To: The City of Simi Valley
Attn: Ben Gonzales
2929 Tapo Canyon Road
Simi Valley, CA 93063
Re: Construction Management Support Services (CMSS) Phase 1 Dear Ben Gonzales:
In response to the meeting with Simi Valley Transit on 5/26/2026, Burns Engineering is pleased to present a quote to provide support for the Simi Valley EVSE Phase 1 Construction Management Support Services to deliver a safe, on-schedule, on-budget project with documented quality, clear communication, and complete turnover. Burns / Terravanta will be on site once a week to provide oversight, coordination, and management services on construction progress for the Phase 1 project. Phase 1 consists of constructing an EV Charging facility at the 490 W Los Angeles Ave Transit Center site. This project will consist of seven (7) new EV Chargers along the north property line. Power will be provided via a new distribution board fed from the existing electrical service on site.
This cost proposal is prepared in accordance with the RFP documents:
a) TD2525566 FINAL CUSTOMER MAP.pdf
b) 2026-02-20 Simi Valley EVSE_Plans.pdf
c) 2026-02-20 Simi Valley EVSE_Structural Calculations.pdf d) 2026-02-20 Simi Valley EVSE_Price Bid Schedule.pdf
e) 2026-02-20 Simi Valley EVSE_Specifications.pdf
f) 3-RFI Simi Valley Transit CMSS Phase 1 Work 05-29-2026.docx Burns Engineering will provide:
1) Coordination between SVT and contractor to allow for the site to remain operational during construction activities.
2) Provide overall management of consultant and construction contracts, including design, bid & award, and construction phase of projects, to include the approval of deliverables, setting and monitoring schedule and budget milestones, review of invoicing and progress pay estimates, work progress, document meetings, and overall quality assurance in consultation with City’s project manager.
3) Attend, observe, log, and support the electrical, civil, and structural construction and trade inspections that will be required to construct the project and install the new EVSE.
This phase will include grading, trenching, conduit runs, concrete housekeeping pads, anchoring and grounding for the panelboard, protective devices, and for the chargers themselves.
4) Verify and coordinate with Simi Valley Transit, Vehicle OEM, Heliox, and Siemens that all charging equipment and CMS software systems have been integrated and functioning with each other. This involves running multiple test buses successfully through the full Exhibit A-2 - Construction Management Support Services (CMSS) Phase 1 18 charging cycle and confirming full CMS functionality (e.g., charging sessions are managed, charging session data is downloaded properly, etc.) 5) Once the construction work is completed, and both EVSE and CMS are fully operational, the Burns Team will document that all systems are commissioned, integrated, and fully functional/operational. Electrical contractor and CMS provider responsible for any on-site testing required. Burns will follow-up with vendors to ensure full functionality of all systems as well as owner training on these systems.
Deliverables:
- Weekly construction progress report(s).
- Host weekly construction progress meetings, prepare agendas and notes, perform site observation and issue observation reports.
- Review and process change orders and pay requests based on percentages complete, as required.
- Review and log general contractor Requests for Information (RFI), material and equipment submittals, design clarifications, general compliance, and address contract issues, as required.
- Oversee EVSE Commissioning and CMS Integration.
- Prepare construction punch lists and coordinate resolution of punch list items. - Review and approve contractor syllabus for Owner Training and validate training was performed.
- Support Project and Construction Closeout. Close-Out tasks to include the collection of as-built drawings, O&M manuals, equipment warranties, test and commissioning reports, training records, permit final approvals, and final inspection signoff.
Schedule:
- Schedule is based upon assumption that work will be done without interruption, working Monday through Friday between the hours of 7 AM to 5 PM. No on-site work will be performed on Saturdays, Sundays, or City recognized holidays. - Project pricing based on a continuous 13-week construction schedule anticipated to take place between November 2026 and March 2027.
- Construction is expected to begin within (10) business days of Notice to Proceed (NTP) issued to contractor. Project construction expected to complete within (90) calendar days after NTP.
- Pricing based on team mobilizing (1) time for project. 19 Pricing:
Assumptions and Exclusions:
- Burns’ services, schedule, and pricing are based on the accuracy and completeness of the documents, information, schedules, equipment data, permits, approvals, and direction provided by SVT, the Engineer of Record, contractors, vendors, utility providers, and other third parties. Burns is entitled to rely on such information without independent verification, except as expressly included in this scope. Revisions, deficiencies, omissions, conflicts, or late delivery of such information may require additional services and/or schedule adjustment.
- Burns Engineering will not design documents, construction documents, record drawings, or as-built documents for this effort. All design documents, changes, corrections, clarifications, or modifications will be completed, approved and sealed by the Engineer of Record, Linkture. RFIs, submittals, field changes or contractor questions requiring design judgment will be provided to Linkture for final decision, approval, and direction. - Burns is not responsible for validating or executing equipment warranties, operations & maintenance obligations; approving alternative or substitute equipment; confirming cellsignal strength or network coverage; utility relocations; hazardous materials; differing site conditions; concealed, subsurface, or above-ground conditions; or any condition not accurately shown in the construction documents or otherwise disclosed to Burns before pricing. Investigation, evaluation, design, mitigation, remediation, or coordination associated with such conditions is excluded unless authorized as additional services. - Permit fees, necessary permits, inspection fees, plan check fees, licensing fees, agency review fees, utility fees, and any other governmental, utility, or third-party charges are excluded from Burns’ scope and pricing and are assumed to be obtained, paid for, and maintained by others.
- Burns makes no guarantee of contractor, subcontractor, supplier, vendor, utility, or equipment performance. The contractor remains solely responsible for construction means, methods, techniques, sequences, procedures, site safety, jobsite supervision, labor, materials, equipment, temporary facilities, and compliance with applicable 20 construction requirements. Burns’ observations, meetings, reviews, reports, or recommendations do not relieve the contractor or any third party of their responsibilities. - SVT to provide a soft copy of:
o The Phase 1 Stamped Electrical Plan Set,
o The Building Permit from City of Simi Valley Building Department, and o Specification sheets and / or installation manuals of all electrical equipment purchased, including but not limited to: Heliox 60-kW EVSE, 60/30-kW Heliox COMPACT Pedestal Base, 800A EV Panel Board, and Retrofit Charger Pedestal. - Site Visits
o Cost includes three (3) on-site visits from Burns – one for the pre-bid meeting (attended by two Burns employees), the construction kick-off meeting, and one during commissioning / closeout. Construction kick-off All other meetings with Burns assumed to be virtual. Additional Burns site visits, in-person meetings, extended on-site presence, after-hours support, weekend support, or travel caused by schedule changes, delays, rework, failed inspections, retesting, or additional commissioning events are excluded and may be provided only as additional services.
o Cost includes one (1) site visit per week from Terravanta during course of construction.
- Any services not expressly identified in this proposal are excluded and may be performed only upon written authorization as additional services. Additional services may include, without limitation, added meetings, additional site visits, extended construction duration, resequencing, remobilization, claims support, dispute resolution support, recovery schedule review, redesign coordination, additional commissioning support, after-hours work, weekend or holiday work, expedited deliverables, or support resulting from contractor, vendor, utility, agency, or owner-caused delay. - SVT and the contractor will provide Burns with safe, timely, and reasonable access to the site, project personnel, documents, systems, equipment, and information necessary to perform the services. Burns is not responsible for site security, public safety, traffic control, temporary facilities, lockout/tagout, energized electrical work, contractor safety programs, or directing contractor personnel.
- Commissioning, CMS validation, owner training validation, and closeout support are dependent on timely completion of contractor work, delivery and installation of required equipment, availability of buses and owner/vendor personnel, utility service availability, network connectivity, manufacturer support, and delivery of complete equipment documentation. Delays, deficiencies, failed tests, incomplete documentation, software issues, network issues, unavailable vehicles, or unavailable vendor support may require additional services and/or schedule adjustment.
- There are no telecommunications additions to this scope. EVSE will be shipped with SIM Cards from manufacturer. Any communications construction scope (new telecommunications lines, fiber lines, ethernet, wireless, etc.) or procurement of new SIM cards are excluded.
- Burns is not responsible for delays caused by factors beyond its reasonable control, including but not limited to acts of God, force majeure events, adverse weather 21 conditions, labor disputes, shortages of labor or materials, governmental actions, utility interruptions, permit or agency review delays, contractor, subcontractor, supplier, vendor, utility, or other third-party delays, failed inspections, rework, retesting, commissioning delays, or delays resulting from the Client’s failure to provide timely information, approvals, access, or direction. Pricing is based on one (1) mobilization and the schedule assumptions stated herein. If the project duration, phasing, sequencing, working hours, mobilization requirements, or level of effort changes for reasons outside Burns’ control, Burns shall be entitled to an equitable adjustment in fee and schedule. - Proposal is a supplement to Project PW 25-02. Unless expressly modified herein, the work will be performed and invoiced under the applicable master contract terms, general project scope, and assumptions provided in Burns’ amended proposal dated January 09, 2026.
Sincerely,
Burns Engineering, Inc.
John Kessler
Project Manager
2026-0058
Burns Engineering, Inc.
Signature
Print Name
Title
Date
Signature
Print Name
Title
Date