Cities Index.
Agenda packet

Solana Beach City Council
January 15, 2025

Document
Agenda packet
Meeting
January 15, 2025
Body
Solana Beach City Council
Pages
17
Original file
26.5 MB
Text extracted from the city's file for reading and search. Open the original on www.cityofsolanabeach.ca.gov. That file is the official record.

Solana Beach City Council Regular Meeting Agenda January 15, 2025 Page 1 of 7

CITY OF SOLANA BEACH

SOLANA BEACH CITY COUNCIL, SUCCESSOR AGENCY TO THE REDEVELOPMENT

AGENCY, PUBLIC FINANCING AUTHORITY, & HOUSING AUTHORITY AGENDA
Joint REGULAR Meeting
Wednesday, January 15, 2025 * 6:00 p.m.

City Hall / Council Chambers, 635 S. Highway 101, Solana Beach, California ➢ City Council meetings are video recorded and archived as a permanent record. The video recording captures the complete proceedings of the meeting and is available for viewing on the City's website. ➢ Posted Reports & Supplemental Docs contain records up to the cut off time prior to meetings for processing new submittals. Complete records containing meeting handouts, PowerPoints, etc. can be obtained through a Records Request.

PUBLIC MEETING ACCESS
The Regular Meetings of the City Council are scheduled for the 2nd and 4th Wednesdays and are broadcast live. The video taping of meetings are maintained as a permanent record and contain a detailed account of the proceedings. Council meeting tapings are archived and available for viewing on the City’s Public Meetings webpage.

WATCH THE MEETING
• Live web-streaming: Meetings web-stream live on the City’s website on the City’s Public Meetings webpage. Find the large Live Meeting button.
• Live Broadcast on Local Govt. Channel: Meetings are broadcast live on Cox Communications - Channel 19 / Spectrum (Time Warner)-Channel 24 / AT&T U-verse Channel 99. • Archived videos online: The video taping of meetings are maintained as a permanent record and contain a detailed account of the proceedings. Council meeting tapings are archived and available for viewing on the City’s Public Meetings webpage.

AGENDA MATERIALS
A full City Council agenda packet including relative supporting documentation is available at City Hall, the Solana Beach Branch Library (157 Stevens Ave.), La Colonia Community Ctr., and online www.cityofsolanabeach.org. Agendas are posted at least 72 hours prior to regular meetings and at least 24 hours prior to special meetings. Writings and documents regarding an agenda of an open session meeting, received after the official posting, and distributed to the Council for consideration, will be made available for public viewing at the same time. In addition, items received at least 1 hour 30 minutes prior to the meeting time will be uploaded online with the agenda posting. Materials submitted for consideration should be forwarded to the City Clerk’s department 858-720-2400. The designated location for viewing of hard copies is the City Clerk’s office at City Hall during normal business hours.

PUBLIC COMMENTS
Written correspondence (supplemental items) regarding an agenda item at an open session meeting should be submitted to the City Clerk’s Office at [email protected] with a) Subject line to include the meeting date b) Include the Agenda Item # as listed on the Agenda. o Correspondence received after the official posting of the agenda, but two hours prior to the meeting start time, on the meeting day, will be distributed to Council and made available online along with the agenda posting. All submittals received before the start of the meeting will be made part of the record. o Written submittals will be added to the record and not read out loud.

And/Or
Verbal Comment Participation:

Please submit a speaker slip to the City Clerk prior to the meeting, or the announcement of the Section/Item, to provide public comment. Allotted times for speaking are outlined on the speaker’s slip for each agenda section: Oral Communications, Consent, Public Hearings and Staff Reports.

Public speakers have 3 minutes each to speak on each topic. Time may be donated by another individual who is present at the meeting to allow an individual up to 6 minutes to speak. Group: Time Solana Beach City Council Regular Meeting Agenda January 15, 2025 Page 2 of 7 may be donated by two individuals who are present at the meeting allowing an individual up to 10 minutes to speak. Group Hearings: For public hearings only, time may be donated by two individuals who are present at the meeting allowing an individual up to 15 minutes to speak.

COUNCIL DISCLOSURE
Pursuant to the Levine Act (Gov’t Code Section 84308), any party to a permit, license, contract (other than competitively bid, labor or personal employment contracts) or other entitlement before the Council is required to disclose on the record any contribution, including aggregated contributions, of more than $250 made by the party or the party’s agents within the preceding 12 months to any Council Member. Participants and agents are requested to make this disclosure as well. The disclosure must include the name of the party or participant and any other person making the contribution, the name of the recipient, the amount of the contribution, and the date the contribution was made.

SPECIAL ASSISTANCE NEEDED
In compliance with the Americans with Disabilities Act of 1990, persons with a disability may request an agenda in appropriate alternative formats as required by Section 202. Any person with a disability who requires a modification or accommodation in order to participate in a meeting should direct such request to the City Clerk’s office (858) 720-2400 at least 72 hours prior to the meeting.

As a courtesy to all meeting attendees, please set all electronic devices to silent mode and engage in conversations outside the Council Chambers.

CITY COUNCILMEMBERS
Lesa Heebner
Mayor
Kristi Becker
Deputy Mayor / Councilmember District 2
Jill MacDonald
Councilmember District 4
David A. Zito
Councilmember District 1
Jewel Edson
Councilmember District 3
Alyssa Muto
City Manager
Johanna Canlas
City Attorney
Angela Ivey
City Clerk
SPEAKERS:

Please submit your speaker slip to the City Clerk prior to the meeting or the announcement of the Item. Allotted times for speaking are outlined on the speaker’s slip for Oral Communications, Consent, Public Hearings and Staff Reports.

READING OF ORDINANCES AND RESOLUTIONS:

Pursuant to Solana Beach Municipal Code Section 2.04.460, at the time of introduction or adoption of an ordinance or adoption of a resolution, the same shall not be read in full unless after the reading of the title, further reading is requested by a member of the Council. If any Councilmember so requests, the ordinance or resolution shall be read in full. In the absence of such a request, this section shall constitute a waiver by the council of such reading.

CALL TO ORDER AND ROLL CALL:

CLOSED SESSION REPORT:

FLAG SALUTE:

APPROVAL OF AGENDA:

PROCLAMATIONS/CERTIFICATES: Ceremonial
None at the posting of this agenda
Solana Beach City Council Regular Meeting Agenda January 15, 2025 Page 3 of 7 PRESENTATIONS: Ceremonial items that do not contain in-depth discussion and no action/direction. • Santa Fe Irrigation District
ORAL COMMUNICATIONS:

Comments relating to items on this evening’s agenda are taken at the time the items are heard.

This portion of the agenda provides an opportunity for members of the public to address the City Council on items relating to City business and not appearing on today’s agenda by submitting a speaker slip (located on the back table) to the City Clerk. Pursuant to the Brown Act, no action shall be taken by the City Council on public comment items. Council may refer items to the City Manager for placement on a future agenda. The maximum time allotted for each presentation is THREE MINUTES. No donations of time are permitted (SBMC 2.04.190). Please be aware of the timer light on the Council Dais.

CITY COUNCIL COMMUNITY ANNOUNCEMENTS - COMMENTARY:

An opportunity for City Council to make brief announcements or report on various activities. These items are not agendized for official City business with no action or substantive discussion.

CITY MANAGER / CITY ATTORNEY REPORTS:

An opportunity for the City Manager and City Attorney to make brief announcements or report on various activities. These items are not agendized for official City business with no action or substantive discussion.

A. CONSENT CALENDAR: (Action Items) (A.1. - A.5.)
Items listed on the Consent Calendar are to be acted in a single action of the City Council unless pulled for discussion. Any member of the public may address the City Council on an item of concern by submitting to the City Clerk a speaker slip (located on the back table) before the Consent Calendar is addressed. Those items removed from the Consent Calendar by a member of the Council will be trailed to the end of the agenda, while Consent Calendar items removed by the public will be heard immediately after approval of the Consent Calendar to hear the public speaker.

All speakers should refer to the public comment section at the beginning of the agenda for details.

Please be aware of the timer light on the Council Dais.

A.1. Minutes of the City Council.

Recommendation: That the City Council

1. Approve the Minutes of the City Council meetings held on December 11, 2024.

Item A.1. Report (click here)
Posted Reports & Supplemental Docs contain records up to the cut off time, prior to the start of the meeting, for processing new submittals. The final official record containing handouts, PowerPoints, etc. can be obtained through a Records Request to the City Clerk’s Office.

A.2. Register Of Demands. (File 0300-30)
Recommendation: That the City Council

1. Ratify the list of demands for November 16, 2024 – December 13, 2024.

Item A.2. Report (click here)
Posted Reports & Supplemental Docs contain records up to the cut off time, prior to the start of the meeting, for processing new submittals. The final official record containing handouts, PowerPoints, etc. can be obtained through a Records Request to the City Clerk’s Office.

Solana Beach City Council Regular Meeting Agenda January 15, 2025 Page 4 of 7 A.3. Successor Agency Administrative Budget and Recognized Obligation Payment Schedule. (File 0115-30)
Recommendation: That the City Council

1. Receive the Successor Agency’s enforceable obligations payment information and administrative budget for the period July 1, 2025, to June 30, 2026.

2. Adopt Resolution SA-033 approving the SA Administrative Budget for July 1, 2025, to June 30, 2026.

3. Adopt Resolution SA-034 approving the ROPS 25-26 for July 1, 2025, to June 30, 2026.

Item A.3. Report (click here)
Posted Reports & Supplemental Docs contain records up to the cut off time, prior to the start of the meeting, for processing new submittals. The final official record containing handouts, PowerPoints, etc. can be obtained through a Records Request to the City Clerk’s Office.

A.4. La Colonia Tot Lot Replacement Project Notice of Completion. (File 0730-40) Recommendation: That the City Council

1. Adopt Resolution 2025-002:
a. Authorizing the City Council to accept, as complete, the La Colonia Tot Lot Replacement, Bid No. 2023-08, constructed by Western Rim Constructors, Inc.
b. Authorizing the City Clerk to file a Notice of Completion. c. Authorizing the City Manager to execute Amendment No. 5 to the Professional Services Agreement with Van Dyke Landscape Architects for the La Colonia Tot Lot Project.

Item A.4. Report (click here)
Posted Reports & Supplemental Docs contain records up to the cut off time, prior to the start of the meeting, for processing new submittals. The final official record containing handouts, PowerPoints, etc. can be obtained through a Records Request to the City Clerk’s Office.

A.5. Climate Action Commission Name Change. (File 0120-65) Recommendation: That the City Council

1. Adopt Resolution 2025-003 to change the name of the Climate Action Commission to Climate & Resiliency Commission.

Item A.5. Report (click here)
Posted Reports & Supplemental Docs contain records up to the cut off time, prior to the start of the meeting, for processing new submittals. The final official record containing handouts, PowerPoints, etc. can be obtained through a Records Request to the City Clerk’s Office.

NOTE: The City Council shall not begin a new agenda item after 10:30 p.m. unless approved by a unanimous vote of all members present. (SBMC 2.04.070) Solana Beach City Council Regular Meeting Agenda January 15, 2025 Page 5 of 7 B. PUBLIC HEARINGS: (B.1. – B.2.)
This portion of the agenda provides citizens an opportunity to express their views on a specific issue as required by law after proper noticing by submitting a speaker slip (located on the back table) to the City Clerk. After considering all of the evidence, including written materials and oral testimony, the City Council must make a decision supported by findings and the findings must be supported by substantial evidence in the record. An applicant or designee(s) for a private development/business project, for which the public hearing is being held, is allotted a total of fifteen minutes to speak, as per SBMC 2.04.210. A portion of the fifteen minutes may be saved to respond to those who speak in opposition. All other speakers should refer to the public comment section at the beginning of the agenda for time allotment. Please be aware of the timer light on the Council Dais.

B.1. Fee Study and Cost Allocation Plan Updates. (File 0390-23) Recommendation: That the City Council

1. Conduct the Public Hearing
a. Open the Public Hearing
b. Report Council Disclosures
c. Receive Public Testimony
d. Close the Public Hearing

2. Consider the adoption of Resolution 2025-001 updating the 2025 Fee Schedule.

Item B.1. Report (click here)
Posted Reports & Supplemental Docs contain records up to the cut off time, prior to the start of the meeting, for processing new submittals.

The final official record containing handouts, PowerPoints, etc. can be obtained through a Records Request to the City Clerk’s Office.

B.2. Public Hearing: 701 Valley Ave., Applicant: Witcher and Peterson, Case:

DRP22-010, SDP22-008, APN: 298-131-14 (File 0600-40)
The proposed project meets the minimum objective requirements under the SBMC, is consistent with the General Plan and may be found, as conditioned, to meet the discretionary findings required as discussed in this report to approve a DRP and SDP. Therefore, Staff recommends that the City Council:

1. Conduct the Public Hearing: Open the public hearing, Report Council disclosures, Receive public testimony, Close the public hearing.

2. Find the project exempt from the California Environmental Quality Act pursuant to Section 15303 of the State CEQA Guidelines.

3. If the City Council makes the requisite findings and approves the Project, adopt Resolution 2024-120 conditionally approving a DRP and SDP for a Mixed-Use Development, Solana Beach.

Item B.2. Report (click here)
Posted Reports & Supplemental Docs contain records up to the cut off time, prior to the start of the meeting, for processing new submittals.

The final official record containing handouts, PowerPoints, etc. can be obtained through a Records Request to the City Clerk’s Office.

WORK PLAN COMMENTS:

Adopted June 26, 2024
Solana Beach City Council Regular Meeting Agenda January 15, 2025 Page 6 of 7 COMPENSATION & REIMBURSEMENT DISCLOSURE:

GC: Article 2.3. Compensation: 53232.3. (a) Reimbursable expenses shall include, but not be limited to, meals, lodging, and travel. 53232.3 (d) Members of a legislative body shall provide brief reports on meetings attended at the expense of the local agency “City” at the next regular meeting of the legislative body.

COUNCIL COMMITTEE REPORTS: Council Committees
REGIONAL COMMITTEES: (outside agencies, appointed by this Council) a. City Selection Committee (meets twice a year) Primary-Heebner, Alternate-Edson b. Clean Energy Alliance (CEA) JPA: Primary-Becker, Alternate-Zito c. County Service Area 17: Primary-MacDonald, Alternate-Edson d. Escondido Creek Watershed Authority: Becker / Staff (no alternate). e. League of Ca. Cities’ San Diego County Executive Committee: Primary-MacDonald, Alternate-Becker. Subcommittees determined by its members. f. League of Ca. Cities’ Local Legislative Committee: Primary-MacDonald, AlternateBecker g. League of Ca. Cities’ Coastal Cities Issues Group (CCIG): Primary-MacDonald, Alternate-Becker
h. North County Dispatch JPA: Primary-MacDonald, Alternate-Becker i. North County Transit District: Primary-Edson, Alternate-MacDonald j. Regional Solid Waste Association (RSWA): Primary-Zito, Alternate-MacDonald k. SANDAG: Primary-Heebner, 1st Alternate-Zito, 2nd Alternate-Edson. Subcommittees determined by its members.
l. SANDAG Shoreline Preservation Committee: Primary-Becker, Alternate-Zito m. San Dieguito River Valley JPA: Primary-MacDonald, Alternate-Becker n. San Elijo JPA: Primary-Zito, Primary-Becker, Alternate-City Manager o. 22nd Agricultural District Association Community Relations Committee: Primary-Edson, Primary-Heebner
STANDING COMMITTEES: (All Primary Members) (Permanent Committees) a. Business Liaison Committee – Zito, Edson
b. Fire Dept. Management Governance & Organizational Evaluation – Edson, MacDonald
c. Highway 101 / Cedros Ave. Development Committee – Heebner, Edson d. Parks and Recreation Committee – Zito, Edson
e. Public Arts Committee – Edson, Heebner
f. School Relations Committee – Becker, MacDonald
g. Solana Beach-Del Mar Relations Committee – Heebner, Edson

CITIZEN COMMISSION(S)
a. Climate Action Commission – Zito, Becker
ADJOURN:

Next Regularly Scheduled Meeting is January 29, 2025
Always refer to the City’s website Event Calendar for an updated schedule or contact City Hall. www.cityofsolanabeach.org 858-720-2400
Solana Beach City Council Regular Meeting Agenda January 15, 2025 Page 7 of 7

AFFIDAVIT OF POSTING

STATE OF CALIFORNIA

COUNTY OF SAN DIEGO

CITY OF SOLANA BEACH
§
I, Angela Ivey, City Clerk of the City of Solana Beach, do hereby certify that this Agenda for the January 15, 2025 Council Meeting was called by City Council, Successor Agency to the Redevelopment Agency, Public Financing Authority, and the Housing Authority of the City of Solana Beach, California, was provided and posted on January 09, 2025 at 12:40 p.m. on the City Bulletin Board at the entrance to the City Council Chambers. Said meeting is held at 6:00 p.m., January 15, 2025, in the Council Chambers, at City Hall, 635 S. Highway 101, Solana Beach, California.

Angela Ivey, City Clerk
City of Solana Beach, CA
UPCOMING CITIZEN CITY COMMISSION AND COMMITTEE MEETINGS:

Regularly Scheduled, or Special Meetings that have been announced, are posted on each Citizen Commission’s Agenda webpage. See the Citizen Commission’s Agenda webpages or the City’s Events Calendar for updates.
o Budget & Finance Commission
o Climate Action Commission
o Parks & Recreation Commission
o Public Arts Commission
o View Assessment Commission
}
Solana Beach City Council Special Meeting Action Minutes December 11, 2024 Page 1 of 2

CITY OF SOLANA BEACH

SOLANA BEACH CITY COUNCIL, SUCCESSOR AGENCY TO THE REDEVELOPMENT

AGENCY, PUBLIC FINANCING AUTHORITY, & HOUSING AUTHORITY

ACTION MINUTES
Joint SPECIAL Meeting
Wednesday, December 11, 2024 * 5:45 p.m.

City Hall / Council Chambers, 635 S. Highway 101, Solana Beach, California Action Minutes contain formal actions taken at a City Council meeting.  City Council meetings are video recorded and archived as a permanent record. The video recording captures the complete proceedings of the meeting and is available for viewing on the City's website.  Posted Reports & Supplemental Docs contain records up to the cut off time prior to meetings for processing new submittals. Complete records containing meeting handouts, PowerPoints, etc. can be obtained through a Records Request.

CITY COUNCILMEMBERS
Lesa Heebner
Mayor
Jewel Edson
Deputy Mayor / Councilmember District 3
Kristi Becker
Councilmember District 2
Jill MacDonald
Councilmember District 4
David A. Zito
Councilmember District 1
Alyssa Muto
City Manager
Johanna Canlas
City Attorney
Angela Ivey
City Clerk
CALL TO ORDER AND ROLL CALL:

Mayor Heebner called the meeting to order at 5:45 p.m.

Present: Lesa Heebner, Jewel Edson, Kristi Becker, Jill MacDonald, David A. Zito

Absent: None
Also

Present:

Alyssa Muto, City Manager
Johanna Canlas, City Attorney
Angela Ivey, City Clerk
Dan King, Assistant City Manager
Mo Sammak, City Engineer/Public Works Dir.

Joseph Lim, Community Development Dir.

FLAG SALUTE:

APPROVAL OF AGENDA:

Motion: Moved by Councilmember Zito and second by Deputy Mayor Edson to approve.

Approved 5/0. Ayes: Heebner, Edson, Becker, MacDonald, Zito. Noes: None. Motion carried unanimously.

D. STAFF REPORTS: (D.1. – D.2.)
Submit speaker slips to the City Clerk.

All speakers should refer to the public comment section at the beginning of the agenda for time allotments. Please be aware of the timer light on the Council Dais.

Solana Beach City Council Special Meeting Action Minutes December 11, 2024 Page 2 of 2 D.1. Council Reorganization: Mayor and Councilmember District 1 & 3 Appointments of Office (2024-2028). (File 0410-85)
Recommendation: That the City Council

1. Administer the official Oath of Office, prescribed in the California Constitution, to the newly appointed officials in lieu of election, Mayor Lesa Heebner, Councilmember District 1 David A. Zito and Councilmember District 3 Jewel Edson for terms of 2024-2028.

Oaths administered.

D.2. Annual Deputy Mayor Appointment. (File 0410-85)
Recommendation: That the City Council

1. Review and designate an appointment of the 2025 Deputy Mayor for a term of December 11, 2024, to December 10, 2025.

Motion: Moved by Mayor Heebner and second by Deputy Mayor Edson to appoint Kristi Becker as Deputy Mayor. Approved 5/0. Ayes: Heebner, Edson, Becker, MacDonald, Zito. Noes: None. Motion carried unanimously.

ADJOURN:

Mayor Heebner adjourned the meeting at 5:52 p.m.

Angela Ivey, City Clerk Approved: _________________
Solana Beach City Council Regular Meeting Action Minutes December 11, 2024 Page 1 of 6

CITY OF SOLANA BEACH

SOLANA BEACH CITY COUNCIL, SUCCESSOR AGENCY TO THE REDEVELOPMENT

AGENCY, PUBLIC FINANCING AUTHORITY, & HOUSING AUTHORITY

ACTION MINUTES
Joint REGULAR Meeting
Wednesday, December 11, 2024 * 6:00 p.m.

City Hall / Council Chambers, 635 S. Highway 101, Solana Beach, California  City Council meetings are video recorded and archived as a permanent record. The video recording captures the complete proceedings of the meeting and is available for viewing on the City's website.  Posted Reports & Supplemental Docs contain records up to the cut off time prior to meetings for processing new submittals. Complete records containing meeting handouts, PowerPoints, etc. can be obtained through a Records Request.

CITY COUNCILMEMBERS
Lesa Heebner
Mayor
Kristi Becker
Deputy Mayor / Councilmember District 2
Jill MacDonald
Councilmember District 4
David A. Zito
Councilmember District 1 Jewel Edson
Councilmember District 3
Alyssa Muto
City Manager
Johanna Canlas
City Attorney
Angela Ivey
City Clerk
CALL TO ORDER AND ROLL CALL:

Mayor Heebner called the meeting to order at 6:00 p.m.

Present: Lesa Heebner, Jewel Edson, Kristi Becker, Jill MacDonald, David A. Zito

Absent: None
Also

Present:

Alyssa Muto, City Manager
Johanna Canlas, City Attorney
Angela Ivey, City Clerk
Dan King, Assistant City Manager
Mo Sammak, City Engineer/Public Works Dir.

Joseph Lim, Community Development Dir.

FLAG SALUTE:

APPROVAL OF AGENDA:

Motion: Moved by Deputy Mayor Becker and second by Councilmember Edson to approve. Approved 5/0. Ayes: Heebner, Edson, Becker, MacDonald, Zito. Noes: None.

Motion carried unanimously.

PROCLAMATIONS/CERTIFICATES: Ceremonial
 City Engineer Mo Sammak Retirement
Solana Beach City Council Regular Meeting Action Minutes December 11, 2024 Page 2 of 6 ORAL COMMUNICATIONS:

Comments relating to items on this evening’s agenda are taken at the time the items are heard.

This portion of the agenda provides an opportunity for members of the public to address the City Council on items relating to City business and not appearing on today’s agenda by submitting a speaker slip (located on the back table) to the City Clerk. Pursuant to the Brown Act, no action shall be taken by the City Council on public comment items. Council may refer items to the City Manager for placement on a future agenda. The maximum time allotted for each presentation is THREE MINUTES. No donations of time are permitted (SBMC 2.04.190). Please be aware of the timer light on the Council Dais.

Diana Kutlow – Legislative Update from Senator Blakespear Akiko Maede – Storm Drain Requirements and City’s Municipal Code CITY COUNCIL COMMUNITY ANNOUNCEMENTS - COMMENTARY:

An opportunity for City Council to make brief announcements or report on various activities. These items are not agendized for official City business with no action or substantive discussion.

CITY MANAGER / CITY ATTORNEY REPORTS:

An opportunity for the City Manager and City Attorney to make brief announcements or report on various activities. These items are not agendized for official City business with no action or substantive discussion.

A. CONSENT CALENDAR: (Action Items) (A.1. - A.5.)
Items listed on the Consent Calendar are to be acted in a single action of the City Council unless pulled for discussion. Any member of the public may address the City Council on an item of concern by submitting to the City Clerk a speaker slip (located on the back table) before the Consent Calendar is addressed. Those items removed from the Consent Calendar by a member of the Council will be trailed to the end of the agenda, while Consent Calendar items removed by the public will be heard immediately after approval of the Consent Calendar to hear the public speaker.

All speakers should refer to the public comment section at the beginning of the agenda for details.

Please be aware of the timer light on the Council Dais.

A.1. Minutes of the City Council.

Recommendation: That the City Council

1. Approve the Minutes of the City Council meetings held on October 23, 2024, November 13, 2024, and November 20, 2024.

Motion: Moved by Councilmember Zito and second by Councilmember Edson to approve. Approved 5/0. Ayes: Heebner, Edson, Becker, MacDonald, Zito. Noes: None.

Motion carried unanimously.

A.2. Register Of Demands. (File 0300-30)
Recommendation: That the City Council

1. Ratify the list of demands for October 26, 2024 – November 15, 2024.

Motion: Moved by Councilmember Zito and second by Councilmember Edson to approve. Approved 5/0. Ayes: Heebner, Edson, Becker, MacDonald, Zito. Noes: None.

Motion carried unanimously.

Solana Beach City Council Regular Meeting Action Minutes December 11, 2024 Page 3 of 6 A.3. 2025 City Council Meeting Schedule Planning. (File 0410-05) Recommendation: That the City Council

1. Review, edit, and/or approve a 2025 anticipated Council meeting schedule and make changes if necessary.

2. Adopt Resolution 2024-117 re-establishing Regular Council meeting dates for 2025 with proposed meetings dates.

Motion: Moved by Councilmember Zito and second by Councilmember Edson to approve. Approved 5/0. Ayes: Heebner, Edson, Becker, MacDonald, Zito. Noes: None.

Motion carried unanimously.

A.4. City Hall Fire Alarm System Upgrade. (File 0260-40) Recommendation: That the City Council

1. Adopt Resolution 2024-116 authorizing the City Manager to execute an amendment to the Professional Services Agreement with Symons Fire Protection, Inc., to include fire alarm system upgrades at City Hall during Fiscal Year 2024/25, increasing the contract by $5,000 for a total not-to-exceed amount of $21,500 for Fiscal Year 2024/25 only.

Motion: Moved by Councilmember Zito and second by Councilmember Edson to approve. Approved 5/0. Ayes: Heebner, Edson, Becker, MacDonald, Zito. Noes: None.

Motion carried unanimously.

A.5. Dead Animal Disposal and Pest-Rodent Control Services. (File 0410-08) Recommendation: That the City Council

1. Adopt Resolution 2024-118 authorizing the City Manager to execute an amendment to the Professional Services Agreement with Habitat Protection, Inc., for pest control, rodent management, and dead animal disposal services during Fiscal Year 2024/25, increasing the contract by $5,000 for a total not-toexceed amount of $14,960 for Fiscal Year 2024/25 only.

Motion: Moved by Councilmember Zito and second by Councilmember Edson to approve. Approved 5/0. Ayes: Heebner, Edson, Becker, MacDonald, Zito. Noes: None.

Motion carried unanimously.

C. STAFF REPORTS: (C.1. – C.3.)
Submit speaker slips to the City Clerk.

All speakers should refer to the public comment section at the beginning of the agenda for time allotments. Please be aware of the timer light on the Council Dais.

C.1. Adopt (2nd Reading) Ordinance 534 – Zoning Ordinance Amendments Consistent with the City’s 6th Cycle Housing Element Programs. (File 0610-10) Recommendation: That the City Council

1. Adopt Ordinance 534 amending various Zoning Code sections regarding housing development standards and housing types.

Solana Beach City Council Regular Meeting Action Minutes December 11, 2024 Page 4 of 6 Motion: Moved by Deputy Mayor Becker and second by Councilmember Edson to approve. Approved 5/0. Ayes: Heebner, Edson, Becker, MacDonald, Zito. Noes: None.

Motion carried unanimously.

C.2. Adopt (2nd Reading) Ordinance 536 – Density Bonus Ordinance Update. (File 0630-10)
Recommendation: That the City Council

1. Adopt Ordinance 536 repealing and replacing Section 17.20.050 of the Solana Beach Municipal Code.

Motion: Moved by Deputy Mayor Becker and second by Councilmember Edson to approve. Approved 5/0. Ayes: Heebner, Edson, Becker, MacDonald, Zito. Noes: None.

Motion carried unanimously.

C.3. Council Boards, Committees, Commissions Appointments. (File 0410-05) Recommendation: That the City Council

1. Review the Regional Boards/Commissions/Committees to:
a. Determine the City Selection Committee 2025 alternate member. b. Make new or re-appointments to all other agencies for new two-year terms.

2. Review Council Standing Committees and make appointments for new twoyear terms.

Motion: Moved by Councilmember Edson and second by Councilmember MacDonald to reappoint all current members. Approved 5/0. Ayes: Heebner, Edson, Becker, MacDonald, Zito. Noes: None. Motion carried unanimously.

B. PUBLIC HEARINGS: (B.1. – B.2.)
This portion of the agenda provides citizens an opportunity to express their views on a specific issue as required by law after proper noticing by submitting a speaker slip (located on the back table) to the City Clerk. After considering all of the evidence, including written materials and oral testimony, the City Council must make a decision supported by findings and the findings must be supported by substantial evidence in the record. An applicant or designee(s) for a private development/business project, for which the public hearing is being held, is allotted a total of fifteen minutes to speak, as per SBMC 2.04.210. A portion of the fifteen minutes may be saved to respond to those who speak in opposition. All other speakers should refer to the public comment section at the beginning of the agenda for time allotment. Please be aware of the timer light on the Council Dais.

B.1. Public Hearing: 401-450 Bell Ranch Road, 8 Vacant Lots, Applicant: Shea Homes Limited Partnership, Case: DRP24-002 to 009, APNs: 298-121-69 to 298-121-76. (File 0600-40) The proposed project meets the minimum zoning requirements under the SBMC, may be found to be consistent with the General Plan and may be found, as conditioned, to meet the discretionary findings required as discussed in this report to approve a DRP. Therefore, Staff recommends that the City Council:

1. Conduct the Public Hearing: Open the Public Hearing, Report Council Disclosures, Receive Public Testimony; Close the Public Hearing.

Solana Beach City Council Regular Meeting Action Minutes December 11, 2024 Page 5 of 6

2. Find each project exempt from the California Environmental Quality Act pursuant to Section 15303 of the State CEQA Guidelines; and

3. If the City Council makes the requisite findings and approves each project, adopt each resolution: Resolution 2024-108, Resolution 2024-109, Resolution 2024-110, Resolution 2024-111, Resolution 2024-112, Resolution 2024-113, Resolution 2024-114, and Resolution 2024-115 conditionally approving the construction of new single-story, single-family residences with attached garages, and perform associated site improvements on the 8 vacant lots within the Drift Subdivision at 401-450 Bell Ranch Road, Solana Beach.

Deputy Mayor Becker recused herself due to property interest within 500 ft. of the subject property.

Staff presentation.

Mayor Heebner opened the public hearing.

Council disclosures.

Motion: Moved by Councilmember Edson and second by Councilmember Zito to close the public hearing. Approved 4/0/1. Ayes: Heebner, Edson, MacDonald, Zito. Noes:

None. Absent: Becker (recused). Motion carried.

Motion: Moved by Councilmember Edson and second by Councilmember Zito to approve with modifications adding a condition regarding tree substitutions. Approved 4/0/1.

Ayes: Heebner, Edson, MacDonald, Zito. Noes: None. Absent: Becker (recused). Motion carried.

B.2. Public Hearing: 111 S. Sierra Ave., Structure Development Permit and Conditional Use Permit to Construct a Replacement Marine Safety Center. (File 0600-40)
Recommendation: That the City Council

1. Conduct the Public Hearing: Open the Public Hearing, Report Council Disclosures, Receive Public Testimony; Close the Public Hearing.

2. Find the project exempt from the California Environmental Quality Act pursuant to Section 15302 of the State CEQA Guidelines; and

3. If the City Council makes the requisite findings and approves the project, adopt Resolution 2024-119, conditionally approving the construction of a new 4,309 square foot Marine Safety Center and perform associated site improvements located at 111 S. Sierra Avenue, Solana Beach.

4. Authorize the City Manager to submit the application to the Coastal Commission and take any actions necessary to obtain all needed permits.

Staff presentation.

Mayor Heebner opened the public hearing.

Solana Beach City Council Regular Meeting Action Minutes December 11, 2024 Page 6 of 6 Public speakers
Anthony Gatti, Bruce Gresham, Maureen Finkelstein, John Steele, Ron Kassan, Joe Behrmann, Grant Fletcher.

Motion: Moved by Councilmember Zito and second by Councilmember Edson to close the public hearing. Approved 5/0. Ayes: Heebner, Edson, Becker, MacDonald, Zito.

Noes: None. Motion carried unanimously.

Motion: Moved by Councilmember Zito and second by Councilmember Edson to approve. Approved 5/0. Ayes: Heebner, Edson, Becker, MacDonald, Zito. Noes: None.

Motion carried unanimously.

WORK PLAN COMMENTS:

Adopted June 26, 2024
COMPENSATION & REIMBURSEMENT DISCLOSURE:

GC: Article 2.3. Compensation: 53232.3. (a) Reimbursable expenses shall include, but not be limited to, meals, lodging, and travel. 53232.3 (d) Members of a legislative body shall provide brief reports on meetings attended at the expense of the local agency “City” at the next regular meeting of the legislative body.

COUNCIL COMMITTEE REPORTS: Council Committees
REGIONAL COMMITTEES: (outside agencies, appointed by this Council) STANDING COMMITTEES: (All Primary Members) (Permanent Committees)

CITIZEN COMMISSION(S)
ADJOURN:

Mayor Heebner adjourned the meeting at 8:35 p.m.

Angela Ivey, City Clerk Approved: ______________
CITY COUNCIL ACTION: ____________________________________________________ _________________________________________________________________________ AGENDA ITEM # A.2.

STAFF REPORT

CITY OF SOLANA BEACH
TO: Honorable Mayor and City Councilmembers
FROM: Alyssa Muto, City Manager
MEETING DATE: January 15, 2025
ORIGINATING DEPT: Finance – Rachel Jacobs, Finance Director SUBJECT: Register of Demands
BACKGROUND:

Section 3.04.020 of the Solana Beach Municipal Code requires that the City Council ratify a register of demands which represents all financial demands made upon the City for the applicable period.

DISCUSSION:

Staff certifies that the register of demands has been reviewed for accuracy, that funds are available to pay the above demands, and that the demands comply with the adopted budget.

CEQA COMPLIANCE STATEMENT:

Not a project as defined by CEQA.

FISCAL IMPACT:

The register of demands for November 16, 2024 through December 13, 2024 reflects total expenditures of $2,717,832.21 from various City sources.

WORK PLAN: N/A
Register of Demands: 11/16/2024 through 12/13/2024
Check Register - Disbursement Fund (Attachment 1) $ 2,166,741.73 Net Payroll Retiree Health December 5, 2024 2,842.00
Net Payroll Council December 12, 2024 4,938.91
Net Payroll Staff P11 November 22, 2024 219,885.41
Net Payroll Staff P12 December 6, 2024 323,424.16
TOTAL $ 2,717,832.21
January 15, 2025
Register of Demands

Page 2 of 2 ends

OPTIONS:
• Ratify the register of demands.
• Do not ratify and provide direction.

CITY STAFF RECOMMENDATION:

Staff recommends that the City Council ratify the above register of demands. ________________________
Alyssa Muto, City Manager
Attachments:

1. Check Register – Disbursement Fund
Page: 1 of 10
City of Solana Beach
Register of Demands

11/16/2024 - 12/13/2024
Department
Vendor Description Date
Check/EFT
Number Amount
100 - GENERAL FUND
PAYMENTUS CORPORATION OCTOBER 24 11/21/2024 107504 $923.98 BTF BUILD LLC RFND: SBGR-390 11/21/2024 107484 $24,499.82 STERLING HEALTH SERVICES, INC. P10 FSA/DCA CONTRIBUTIONS 11/21/2024 9001816 $2,113.98 STERLING HEALTH SERVICES, INC. P10 FSA/DCA CONTRIBUTIONS 11/21/2024 9001816 $1,825.04 MISSION SQUARE PLAN 302817 Payroll Run 1 - Warrant P11 11/21/2024 9001808 $9,745.20 SOLANA BEACH FIREFIGHTERS ASSOC Payroll Run 1 - Warrant P11 11/21/2024 9001814 $900.00 SAN DIEGO COUNTY SHERIFF'S DEPT. JUL 24-TOW FEE CREDIT 11/21/2024 107510 ($109.42) SAN DIEGO COUNTY SHERIFF'S DEPT. AUG 24-TOW FEE CREDIT/SB OVERTIME 11/21/2024 107510 ($328.26) SAN DIEGO COUNTY SHERIFF'S DEPT. SEP 24-TOW FEE CREDIT/SB OVERTIME 11/21/2024 107510 ($218.84) SELF INSURED SERVICES COMPANY DEC 24-LIFE&ADD/SUPPLIFE INS/LTD 11/27/2024 9001819 $1,302.88 SELF INSURED SERVICES COMPANY DEC 24-LIFE&ADD/SUPPLIFE INS/LTD 11/27/2024 9001819 $350.75 SELF INSURED SERVICES COMPANY DEC 24-LIFE&ADD/SUPPLIFE INS/LTD 11/27/2024 9001819 $1,201.58 GEARY & JILL SMITH RFND: FCCC 12/14/24 11/27/2024 107523 $166.53 GEARY & JILL SMITH RFND: FCCC 12/14/24 11/27/2024 107523 $647.74 THE JANICE N ISRAEL TRUST RFND: ENC24-0123 11/27/2024 107531 $1,170.00 MICHAEL NEWHOUSE & ROSE LOCHMANN RFND: FC 11/10/24 11/27/2024 107525 $500.00 RENEE MILTON RFND: FCCC 11/09/24 11/27/2024 107529 $500.00 PRE-PAID LEGAL SERVICES, INC PRE-PAID LEGAL - NOV 2024 11/27/2024 107528 $25.90 STERLING HEALTH SERVICES, INC. PC05 FSA CONTRIBUTION 11/27/2024 9001820 $266.67 STERLING HEALTH SERVICES, INC. P11 FSA/DCA CONTRIBUTIONS 11/27/2024 9001820 $2,113.98 STERLING HEALTH SERVICES, INC. P11 FSA/DCA CONTRIBUTIONS 11/27/2024 9001820 $1,825.04 CONSTRUCTION TESTING & ENGINEERING, INC. OCT-NOV 24-GRD22-0011- INSPECTION/REVIEW 12/05/2024 9001838 $220.00 FIDELITY SECURITY LIFE INSURANCE COMPANY DEC 24-VISION-GROUP ID:1051871 12/05/2024 107553 $528.18 SAN DIEGO SUPERIOR COURT-SOUTH COUNTY RFND: REVENUE DISTRIBUTIONS FUND 12/05/2024 107569 $17.41 MISSION SQUARE PLAN 302817 Payroll Run 1 - Warrant P12 12/05/2024 9001827 $10,755.19 SOLANA BEACH FIREFIGHTERS ASSOC Payroll Run 1 - Warrant P12 12/05/2024 9001835 $900.00 INTEGRITY RESTORATION INC RFND: OVERPAYMENT BC-008588 2025 RENEWAL 12/05/2024 107556 $61.00 DRAIN MEDIC INC RFND: OVERPAYMENT BC-008301 2025 RENEWAL 12/05/2024 107551 $61.00 KRISTINE & PAUL CURRIER RFND: OVERPAYMENT BC-012319 2025 RENEWAL 12/05/2024 107558 $112.00 AFLAC NOVEMBER 24 12/05/2024 107536 $914.88
SELF INSURED SERVICES COMPANY DEC 24- DENTAL 12/05/2024 9001822 $3,105.30 MARGARET SHAGOTT & DANIEL MEAD RFND: STVR-000539 / DUPLICATE PAYMENT 12/05/2024 107562 $112.00 MARGARET SHAGOTT & DANIEL MEAD RFND: STVR-000539 / DUPLICATE PAYMENT 12/05/2024 107562 $4.00 KIM ELY RFND: FCCC - 11/16/24 12/05/2024 107557 $500.00 IAFF-MERP NOV 24-FF TRUST PAYMENT 12/05/2024 9001839 $4,975.00 MISSION SQUARE PLAN 302817 Payroll Run 2 - Warrant PC06 12/13/2024 9001843 $4,536.32 STERLING HEALTH SERVICES, INC. P12 FSA/DCA CONTRIBUTIONS 12/13/2024 9001851 $2,113.98 STERLING HEALTH SERVICES, INC. P12 FSA/DCA CONTRIBUTIONS 12/13/2024 9001851 $1,825.04 BRENT & LESLIE STRINGER RFND: GRD23-0006 12/13/2024 107606 $20,688.00 HP COMMUNICATIONS INC RFND: ENC24-0074 12/13/2024 107592 $833.00 LAURIE STRAWN RFND: ENC24-0125 12/13/2024 107597 $244.00 WILLIAM & MARYANN KUHNERT RFND: SB0645604 12/13/2024 107596 $22.50 NORTH COAST REPERTORY THEATER RFND: 2025 BC RENEWAL OVRPYMNT-BC-000789 12/13/2024 107601 $51.00 Page: 2 of 10
THE RYAN FAMILY TRUST RFND: SB0652599 12/13/2024 107607 $305.00 TOTAL GENERAL FUND $102,307.37
1005150 - CITY CLERK
KFORCE INC. 10/17/24-TEMP SERVICES-CLK 12/05/2024 9001829 $780.00 KFORCE INC. 10/24/24-TEMP SERVICES-CLK 12/05/2024 9001829 $1,093.20 KFORCE INC. 10/31/24-TEMP SERVICES-CLK 12/05/2024 9001829 $786.80 KFORCE INC. 11/07/24-TEMP SERVICES-CLK 12/05/2024 9001829 $820.00 KFORCE INC. 11/14/24-TEMP SERVICES-CLK 12/05/2024 9001829 $660.00 KFORCE INC. 11/21/24-TEMP SERVICES-CLK 12/05/2024 9001829 $630.00 ECS IMAGING INC ECS LASERFICHE 12/05/2024 107552 $17,972.50 PERFECT IMAGE VIDEO MP4/DVD/VHS CONVERSION 12/05/2024 107565 $673.65 CODE PUBLISHING COMPANY INC MUNICIPAL CODE WEB UPDATE 12/05/2024 107544 $801.25 UT SAN DIEGO - NRTH COUNTY ORD 535 INTRO 12/05/2024 107575 $194.77 UT SAN DIEGO - NRTH COUNTY ORD 535 ADOPTION 12/05/2024 107575 $185.85 UT SAN DIEGO - NRTH COUNTY ORD 537 INTRO 12/05/2024 107575 $176.92 IRON MOUNTAIN SEP 24-SHREDDING 12/13/2024 107593 $358.74 IRON MOUNTAIN OCT 24-SHREDDING 12/13/2024 107593 $357.42 IRON MOUNTAIN NOV 24-SHREDDING 12/13/2024 107593 $539.31 FEDEX SHIPPING - 11/25/24 12/13/2024 107588 $44.09
TOTAL CITY CLERK $26,074.50
1005200 - CITY MANAGER
EMANUELS JONES & ASSOCIATES, LLC JUL 24-LOBBYING SERVICES 11/21/2024 9001806 $2,785.12 EMANUELS JONES & ASSOCIATES, LLC AUG 24-LOBBYING SERVICES 11/21/2024 9001806 $2,860.12 EMANUELS JONES & ASSOCIATES, LLC SEP 24-LOBBYING SERVICES 11/21/2024 9001806 $2,875.12 EMANUELS JONES & ASSOCIATES, LLC OCT 24-LOBBYING SERVICES 11/21/2024 9001806 $2,785.12 EMANUELS JONES & ASSOCIATES, LLC NOV 24-LOBBYING SERVICES 11/21/2024 9001806 $2,785.12 TOTAL CITY MANAGER $14,090.60
1005300 - FINANCE
WILLDAN OCT 24-USER FEE STUDY & COST ALLOCATION PLAN 11/21/2024 9001818 $2,402.00 DAVIS FARR, LLP FY24 AUDIT SERVICES-JUN-OCT 24 11/21/2024 107491 $17,200.00 CSMFO 25 CSMFO MEMBERSHIP 11/27/2024 107521 $60.00
TOTAL FINANCE $19,662.00
1005350 - SUPPORT SERVICES
XEROX CORPORATION OCT 24-XEROX FIERY -UPSTAIRS 11/21/2024 107518 $132.61 XEROX CORPORATION OCT 24-XEROX FIERY -PLN/ENG 11/21/2024 107518 $132.61 XEROX CORPORATION OCT 24-XEROX FIERY -CLK 11/21/2024 107518 $122.84 XEROX CORPORATION OCT 24-XEROX -CLK 11/21/2024 107518 $271.68 XEROX CORPORATION OCT 24-XEROX -CLK 11/21/2024 107518 $322.69 XEROX CORPORATION OCT 24-XEROX -UPSTAIRS 11/21/2024 107518 $96.90 XEROX CORPORATION OCT 24-XEROX -PLN/ENG 11/21/2024 107518 $546.78 XEROX CORPORATION OCT 24-XEROX -PLN/ENG 11/21/2024 107518 $45.66 XEROX CORPORATION OCT 24-XEROX -UPSTAIRS 11/21/2024 107518 $298.25 TOTAL SUPPORT SERVICES $1,970.02
1005400 - HUMAN RESOURCES
NEOGOV, INC FY25- SUBSCRIPTION INSIGHT RENEWAL 11/21/2024 107502 $6,427.87 NEOGOV, INC FY 25-SSO SUBSCRIPTION RENEWAL 11/21/2024 107502 $1,216.00 NEOGOV, INC FY 25-ONBOARD/PERFORM SUBSCRIPTION RENEWAL 11/21/2024 107502 $13,352.34 COASTAL LIVE SCAN AND INSURANCE OCT 24-FINGERPRINTS 11/21/2024 107488 $30.00 ALTA LANGUAGE SERVICES, INC LANGUAGE TEST 11/21/2024 107482 $71.00 EMPLOYMENT DEVELOPMENT DEPARTMENT 932-0244-8 SUI PE 093024 11/21/2024 107493 $333.24 CODE 4 INVESTIGATIONS, INC. BACKGROUND CHECK 12/05/2024 9001832 $750.00 Page: 3 of 10
ANDREW MAGOON REIMB: BACKGROUND FEE 12/05/2024 107538 $15.00 DONNOE & ASSOCIATES, INC WRITTEN TEST/BOOKS-MS 12/05/2024 107550 $495.00 DEPARTMENT OF JUSTICE OCT 24-FINGERPRINT APP 12/05/2024 107548 $64.00 COASTAL LIVE SCAN AND INSURANCE NOV 24-FINGERPRINTS 12/13/2024 107583 $30.00 SHARP REES-STEALY MEDICAL GROUP SCH#:700000690-PRE-EMPLOYMENT 12/13/2024 9001849 $917.00 SHARP REES-STEALY MEDICAL GROUP SCH#:700000690-PRE-EMPLOYMENT 12/13/2024 9001849 $312.00 STAPLES CONTRACT & COMMERCIAL NAPKIN DSPNSRS 12/13/2024 107604 $74.98 JASON JUNG RFND: LIVESCAN 12/13/2024 107595 $35.00
TOTAL HUMAN RESOURCES $24,123.43
1005450 - INFORMATION SERVICES
MANAGED SOLUTION NOV 24-Office 365 and IT Support 12/05/2024 9001830 $2,524.70 COX COMMUNICATIONS INC 0013410039730701-11/19/24-12/18/24 12/05/2024 107545 $321.95 MANAGED SOLUTION Office 365 and IT Support-NOVEMBER 12/05/2024 9001830 $99.60 TOTAL INFORMATION SERVICES $2,946.25
1005560 - BUILDING SERVICES
ESGIL CORPORATION OCT 24-BUILDING/SAFETY PLAN REVIEW/INSPECTIONS 11/21/2024 107495 $97,257.94 ESGIL CORPORATION NOV 24-BUILDING/PLAN 12/13/2024 107587 $29,489.86 TOTAL BUILDING SERVICES $126,747.80
1005590 - CODE ENFORCEMENT
EMBROIDERY IMAGE EMBROIDERY-CODE 11/21/2024 107494 $34.55 WEX FLEET UNIVERSAL 10/08/24-11/07/24-AUTO FUEL 11/27/2024 107533 $69.94 COUNTY OF SAN DIEGO_5210 JUL-SEP 24-PARKING CITE ADMIN 11/27/2024 107520 $11,280.78 DATATICKET INC. OCT 24-PARKING CITE ADMIN 12/05/2024 107547 $1,284.18 DATATICKET INC. OCT 24-PARKING CITE ADMIN 12/05/2024 107547 $180.00 DANIEL WELTE REIMB: GAS CAN/GAS 12/05/2024 9001824 $36.31 VERIZON WIRELESS-SD 442224168-00001 - 10/24/24-11/23/24 12/13/2024 107608 $141.39 TOTAL CODE ENFORCEMENT $13,027.15
1006110 - LAW ENFORCEMENT
SAN DIEGO COUNTY SHERIFF'S DEPT. JUL 24-LAW ENFORCEMENT SVC 11/21/2024 107510 $263,045.10 SAN DIEGO COUNTY SHERIFF'S DEPT. AUG 24-LAW ENFORCEMENT SVC 11/21/2024 107510 $425,621.14 SAN DIEGO COUNTY SHERIFF'S DEPT. AUG 24-TOW FEE CREDIT/SB OVERTIME 11/21/2024 107510 $594.47 SAN DIEGO COUNTY SHERIFF'S DEPT. SEP 24-LAW ENFORCEMENT SVC & LPR ANNL

SOFTWARE
11/21/2024 107510 $425,621.14
SAN DIEGO COUNTY SHERIFF'S DEPT. SEP 24-TOW FEE CREDIT/SB OVERTIME 11/21/2024 107510 $404.76 TOTAL LAW ENFORCEMENT $1,115,286.61
1006120 - FIRE DEPARTMENT
SANTA FE IRRIGATION DISTRICT 005512-000 - 09/04/24-11/01/24 11/21/2024 107512 $654.37 NORTH COUNTY EVS, INC. FIRE APPARATUS MAINT/REPAIRS 11/21/2024 9001812 $1,600.09 NORTH COUNTY EVS, INC. FIRE APPARATUS MAINT/REPAIRS 11/21/2024 9001812 $501.48 NORTH COUNTY EVS, INC. FIRE APPARATUS MAINT/REPAIRS 11/21/2024 9001812 $262.06 VERIZON WIRELESS-SD 962428212-00001 - 09/29/24-10/28/24 11/21/2024 107517 $729.32 MICHAEL MONKEN DRIVER 1A 11/21/2024 107500 $259.00
PALOMAR COLLEGE FALL 24 CLASS 11/21/2024 107503 $781.00 AT&T CALNET 3 9391059865-10/01/24-10/31/24 11/27/2024 107519 $545.58 WEX FLEET UNIVERSAL 10/08/24-11/07/24-AUTO FUEL 11/27/2024 107533 $57.38 WEX BANK OCT 24-AUTO FUEL & CR TAX 11/27/2024 107532 $1,850.50 NORTHWEST RIVER SUPPLIES INC RESCUE VESTS/KNIVES/HELMETS/TETHER W/CARABNR 11/27/2024 107526 $1,547.73 NORTH COUNTY EVS, INC. FIRE APPARATUS MAINT/REPAIRS 12/05/2024 9001831 $744.13 FIRE STATS, LLC SEP-OCT 24-DATA ANALYSIS TOOLS MAINT 12/05/2024 107554 $425.00 REGIONAL COMMS SYS, MS 056 - RCS OCT 24-CAP CODE 12/05/2024 107567 $32.50 ACE UNIFORMS LLC POLO/EMBRDY 12/05/2024 9001821 $164.52 Page: 4 of 10
ACE UNIFORMS LLC PANTS/SEWINGS/EMBRDRY/POLOS 12/05/2024 9001821 $496.28 ACE UNIFORMS LLC POLO/EMBRDRY 12/05/2024 9001821 $164.52 RENEWELL FLEET SERVICE LLC CABLE/BUCKLE 12/05/2024 107568 $140.02 SOUTHERN CALIFORNIA FIRE PREVENTION NOV 24-SOCAL MEETING (SCMM112024) 12/05/2024 107573 $25.00 TOTAL FIRE DEPARTMENT $10,980.48
1006150 - CIVIL DEFENSE
AT&T CALNET 3 9391012275 - 10/24/24-11/23/24 12/13/2024 107580 $155.55 TOTAL CIVIL DEFENSE $155.55
1006170 - MARINE SAFETY
VERIZON WIRELESS-SD 962428212-00001 - 09/29/24-10/28/24 11/21/2024 107517 $152.04 LEE'S LOCK & SAFE INC LOCKS/KEY RINGS 11/21/2024 107498 $114.20 JOSEPH PENNELL REIMB: TOWER REMOVAL BREAKFAST 11/21/2024 107505 $113.15 WEX FLEET UNIVERSAL 10/08/24-11/07/24-AUTO FUEL 11/27/2024 107533 $1,245.96 DWS POWERSPORTS INC YAMAHA REPAIR/MAINT 11/27/2024 107522 $1,581.06 CULLIGAN OF SAN DIEGO OCT 24-EQUIPMENT-MS 12/05/2024 107546 $12.95 CULLIGAN OF SAN DIEGO NOV 24-EQUIPMENT-MS 12/05/2024 107546 $12.95 SUNBELT RENTALS, INC. LOADER/FORKLIFT RENTAL 12/05/2024 107574 $1,436.27 CAMEO PAPER & JANITORIAL SUPPLY INC TOWELS/LINERS 12/05/2024 107542 $122.51 SUNBELT RENTALS, INC. FORKLIFT RENTAL 12/05/2024 107574 $3,443.86 SUNBELT RENTALS, INC. CREDIT MEMO-INV# 161297998-0001 12/05/2024 107574 ($1,017.58) AT&T CALNET 3 9391053651 - 10/25/24-11/24/24 12/13/2024 107581 $305.00 AT&T CALNET 3 9391012281 - 10/25/24-11/24/24 12/13/2024 107582 $94.55 DAY WIRELESS SYSTEMS (20) UPFITTING MOUNTS/HARDWARE/KITS/REPAIRS 12/13/2024 107584 $577.25 TOTAL MARINE SAFETY $8,194.17
1006510 - ENGINEERING
VERIZON WIRELESS-SD 362455526-00001 - 10/02/24-11/01/24 11/21/2024 107517 $53.11 UNDERGROUND SVC ALERT OF SOCAL INC OCT 24-DIG ALERT 11/21/2024 9001817 $104.35 WEX FLEET UNIVERSAL 10/08/24-11/07/24-AUTO FUEL 11/27/2024 107533 $220.85 ANDA WRIGHT REIMB: PWX 2024-APWA TRAINING-09/06/24-09/11/24 12/05/2024 107537 $226.88 UNDERGROUND SVC ALERT OF SOCAL INC NOV 24-DIG ALERT 12/13/2024 9001853 $69.20 TOTAL ENGINEERING $674.39
1006520 - ENVIRONMENTAL SERVICES
MISSION LINEN & UNIFORM INC FY25 UNIFORM SERVICES FOR PUBLIC WORKS 11/21/2024 107501 $14.80 MIKHAIL OGAWA ENGINEERING, INC. OCT 24-STORMWATER PROGRAM 11/21/2024 9001810 $8,179.79 CLEAN EARTH ENVIROMENTAL SOLUTIONS OCT 24- HHW COLLECTION 11/21/2024 107487 $1,471.68 VERIZON WIRELESS-SD 362455526-00001 - 10/02/24-11/01/24 11/21/2024 107517 $53.11 WEX FLEET UNIVERSAL 10/08/24-11/07/24-AUTO FUEL 11/27/2024 107533 $642.48 SANTA FE IRRIGATION DISTRICT 005506-014-10/02/24-11/01/24 11/27/2024 107530 $210.98 MISSION LINEN & UNIFORM INC FY25 UNIFORM SERVICES FOR PUBLIC WORKS 12/05/2024 107563 $14.80 IDRAINS LLC K-STORMDRAIN MAINT AND VIDEO INSPECTIONS 12/05/2024 107535 $1,700.00 IDRAINS LLC O-STORMDRAIN MAINT AND VIDEO INSPECTIONS 12/05/2024 107535 $1,340.00 MISSION LINEN & UNIFORM INC FY25 UNIFORM SERVICES FOR PUBLIC WORKS 12/05/2024 107563 $14.81 IDRAINS LLC H-STORMDRAIN MAINT & VIDEO INSPECTIONS 12/13/2024 107578 $1,700.00 MISSION LINEN & UNIFORM INC FY25 UNIFORM SERVICES FOR PUBLIC WORKS 12/13/2024 107599 $14.81 DEL MAR BLUE PRINT COMPANY, INC. BLACK & WHITE PRINT SCANS 12/13/2024 107585 $200.00 TOTAL ENVIRONMENTAL SERVICES $15,557.26
1006530 - STREET MAINTENANCE
VERIZON WIRELESS-SD 362455526-00001 - 10/02/24-11/01/24 11/21/2024 107517 $53.11 MISSION LINEN & UNIFORM INC FY25 UNIFORM SERVICES FOR PUBLIC WORKS 11/21/2024 107501 $24.07 DIXIELINE LUMBER CO INC RAILROAD TIES 11/21/2024 107492 $39.14 DIXIELINE LUMBER CO INC KEY RING/PADLOCK 11/21/2024 107492 $13.97 Page: 5 of 10
DIXIELINE LUMBER CO INC BLACKTOP PATCH 11/21/2024 107492 $179.33 DIXIELINE LUMBER CO INC SCREWS/BOLTS 11/21/2024 107492 $51.84 NISSHO OF CALIFORNIA OCT 24- CITY-WIDE LANDSCAPE MAINT 11/21/2024 9001811 $2,178.16 WEX FLEET UNIVERSAL 10/08/24-11/07/24-AUTO FUEL 11/27/2024 107533 $582.25 SANTA FE IRRIGATION DISTRICT 011695-000-10/02/24-11/01/24 11/27/2024 107530 $91.05 MISSION LINEN & UNIFORM INC FY25 UNIFORM SERVICES FOR PUBLIC WORKS 12/05/2024 107563 $24.07 MISSION LINEN & UNIFORM INC FY25 UNIFORM SERVICES FOR PUBLIC WORKS 12/05/2024 107563 $24.06 JOSE GARCIA MILEAGE - 11/13/24 12/05/2024 9001828 $40.20 TRAFFIC SUPPLY, INC SIGNS 12/05/2024 9001837 $79.17
MANERI TRAFFIC CONTOL INC RAPID DRY PAINT 12/05/2024 107561 $625.31 DIXIELINE LUMBER CO INC GLOVES/CUTTING BLADE 12/05/2024 107549 $50.87 DIXIELINE LUMBER CO INC SPRAY PAINT/CUTTING BLADE/DUSTER 12/05/2024 107549 $54.78 SDG&E CO INC UTILITIES: 09/07/24-11/06/24 12/05/2024 107571 $942.50 SDG&E CO INC UTILITIES: 10/01/24-11/06/24 12/05/2024 107571 $729.29 MISSION LINEN & UNIFORM INC FY25 UNIFORM SERVICES FOR PUBLIC WORKS 12/13/2024 107599 $24.07 BFS GROUP OF CALIFORNIA LLC PROPANE EXCHANGE 12/13/2024 107586 $26.09 BFS GROUP OF CALIFORNIA LLC SANDBAG FIL/PALLET DEPOSIT 12/13/2024 107586 $359.13 TOTAL STREET MAINTENANCE $6,192.46
1006540 - TRAFFIC SAFETY
ALL CITY MANAGEMENT SERVICES, INC CROSSING GUARDS-10/27/24-11/09/24 11/21/2024 9001804 $12,781.25 VERIZON WIRELESS-SD 362455526-00001 - 10/02/24-11/01/24 11/21/2024 107517 $37.93 AT&T CALNET 3 9391012279 - 10/24/24-11/23/24 12/05/2024 107539 $65.50 SDG&E CO INC UTILITIES: 09/07/24-11/06/24 12/05/2024 107571 $1,349.92 SDG&E CO INC UTILITIES: 10/01/24-11/06/24 12/05/2024 107571 $617.75 ALL CITY MANAGEMENT SERVICES, INC CROSSING GUARDS- 11/10/24-11/23/24 12/13/2024 9001840 $11,478.13 REDFLEX TRAFFIC SYSTEMS, INC NOV 24- RED LIGHT CAMERA ENFORCEMENT 12/13/2024 9001845 $1,016.60 REDFLEX TRAFFIC SYSTEMS, INC NOV 24- RED LIGHT CAMERA ENFORCEMENT 12/13/2024 9001845 $7,099.27 TOTAL TRAFFIC SAFETY $34,446.35
1006550 - STREET CLEANING
PRIDE INDUSTRIES OCT 24-TRASH ABATEMENT SERVICES 11/21/2024 107507 $2,300.00 SANTA FE IRRIGATION DISTRICT 011695-000-10/02/24-11/01/24 11/27/2024 107530 $53.48 SCA OF CA, LLC NOV 24 - STREET SWEEPING SERVICES 12/13/2024 9001848 $8,306.75 TOTAL STREET CLEANING $10,660.23
1006560 - PARK MAINTENANCE
NISSHO OF CALIFORNIA FY25 AS NEEDED LANDSCAPING SERVICES 11/21/2024 9001811 $600.00 VERIZON WIRELESS-SD 362455526-00001 - 10/02/24-11/01/24 11/21/2024 107517 $75.87 MISSION LINEN & UNIFORM INC FY25 UNIFORM SERVICES FOR PUBLIC WORKS 11/21/2024 107501 $17.59 NISSHO OF CALIFORNIA OCT 24- CITY-WIDE LANDSCAPE MAINT 11/21/2024 9001811 $11,150.33 WEX FLEET UNIVERSAL 10/08/24-11/07/24-AUTO FUEL 11/27/2024 107533 $120.46 SANTA FE IRRIGATION DISTRICT 005506-018 - 10/02/24-11/01/24 11/27/2024 107530 $407.93 SANTA FE IRRIGATION DISTRICT 005506-019 - 10/02/24-11/01/24 11/27/2024 107530 $144.53 SANTA FE IRRIGATION DISTRICT 005506-021 - 10/02/24-11/01/24 11/27/2024 107530 $2,000.82 SANTA FE IRRIGATION DISTRICT 005506-000 - 09/04/24-11/01/24 11/27/2024 107530 $197.11 SANTA FE IRRIGATION DISTRICT 005506-001 - 09/04/24-11/01/24 11/27/2024 107530 $98.51 SANTA FE IRRIGATION DISTRICT 005506-002 - 09/04/24-11/01/24 11/27/2024 107530 $493.37 SANTA FE IRRIGATION DISTRICT 005506-004 - 09/04/24-11/01/24 11/27/2024 107530 $98.51 SANTA FE IRRIGATION DISTRICT 005506-005 - 09/04/24-11/01/24 11/27/2024 107530 $284.71 SANTA FE IRRIGATION DISTRICT 005506-006 - 09/04/24-11/01/24 11/27/2024 107530 $157.11 SANTA FE IRRIGATION DISTRICT 005506-007 - 09/04/24-11/01/24 11/27/2024 107530 $133.01 SANTA FE IRRIGATION DISTRICT 005506-009 - 09/04/24-11/01/24 11/27/2024 107530 $98.51 SANTA FE IRRIGATION DISTRICT 005506-010 - 09/04/24-11/01/24 11/27/2024 107530 $276.76 Page: 6 of 10
SANTA FE IRRIGATION DISTRICT 005506-011 - 09/04/24-11/01/24 11/27/2024 107530 $384.12 SANTA FE IRRIGATION DISTRICT 005506-012 - 09/04/24-11/01/24 11/27/2024 107530 $2,247.12 SANTA FE IRRIGATION DISTRICT 005506-013 - 09/04/24-11/01/24 11/27/2024 107530 $225.01 SANTA FE IRRIGATION DISTRICT 005979-001 - 09/04/24-11/01/24 11/27/2024 107530 $127.63 SANTA FE IRRIGATION DISTRICT 012448-000 - 09/04/24-11/01/24 11/27/2024 107530 $157.11 SANTA FE IRRIGATION DISTRICT 012448-001 - 09/04/24-11/01/24 11/27/2024 107530 $98.51 SANTA FE IRRIGATION DISTRICT 005506-015 - 09/17/24-11/15/24 11/27/2024 107530 $178.62 SANTA FE IRRIGATION DISTRICT 005506-016- 09/17/24-11/15/24 11/27/2024 107530 $785.30 SANTA FE IRRIGATION DISTRICT 005979-003- 09/17/24-11/15/24 11/27/2024 107530 $1,129.16 RANCHO SANTA FE SECURITY SYS INC DEC 24-ALARM MONITORING 12/05/2024 107566 $331.20 RANCHO SANTA FE SECURITY SYS INC CODES ADDED/DELETED 12/05/2024 107566 $60.00 RANCHO SANTA FE SECURITY SYS INC CODE ADDED 12/05/2024 107566 $10.00 MISSION LINEN & UNIFORM INC FY25 UNIFORM SERVICES FOR PUBLIC WORKS 12/05/2024 107563 $17.59 MISSION LINEN & UNIFORM INC FY25 UNIFORM SERVICES FOR PUBLIC WORKS 12/05/2024 107563 $17.59 SANTA FE IRRIGATION DISTRICT 005506-021 - 11/02/24-11/15/24 - FINAL BILL 12/05/2024 107570 $54.27 BJS&T ENTERPRISES, INC. POWDER COAT/SANDBLAST BENCHES 12/05/2024 9001833 $1,144.84 HD SUPPLY, INC. BLEACH/LINERS 12/05/2024 107555 $1,113.72 MISSION LINEN & UNIFORM INC FY25 UNIFORM SERVICES FOR PUBLIC WORKS 12/13/2024 107599 $17.59 BJS&T ENTERPRISES, INC. POWDER COAT BENCHES 12/13/2024 9001846 $1,717.27 ARTURO ZERMENO MILEAGE - 12/02/24 12/13/2024 107579 $34.84 TOTAL PARK MAINTENANCE $26,206.62
1006570 - PUBLIC FACILITIES
PRIDE INDUSTRIES OCT 24-TRASH ABATEMENT SERVICES 11/21/2024 107507 $2,300.00 SYMONS FIRE PROTECTION Q4 FY25- FIRE SUPRESSION EQUIPMENT SERVICES 11/21/2024 107515 $3,634.00 24 HOUR ELEVATOR, INC NOV 24- ELEVATOR PREVENTATIVE MAINT/REPAIR 11/21/2024 107480 $204.20 STANDARD PLUMBING SUPPLY COMPANY BASKET STRAINER 11/21/2024 107513 $25.47 ARTURO ZERMENO MILEAGE-11/02, 11/03, & 11/05/24 11/21/2024 107483 $167.50 DIXIELINE LUMBER CO INC WALL MOUNT FAUCET 11/21/2024 107492 $79.38 DIXIELINE LUMBER CO INC GLOVES/ROLLERS/PAINT BRUSHES 11/21/2024 107492 $71.45 DIXIELINE LUMBER CO INC MULCH 11/21/2024 107492 $5.64
DIXIELINE LUMBER CO INC GLOVES/MAGIC ERASER 11/21/2024 107492 $10.06 NISSHO OF CALIFORNIA OCT 24- CITY-WIDE LANDSCAPE MAINT 11/21/2024 9001811 $3,195.25 WEX FLEET UNIVERSAL 10/08/24-11/07/24-AUTO FUEL 11/27/2024 107533 $200.77 SANTA FE IRRIGATION DISTRICT 005506-008 - 09/04/24-11/01/24 11/27/2024 107530 $545.12 HABITAT PROTECTION, INC NOV 24-PEST/RODENT CONTROL-SEASCAPE 12/05/2024 9001826 $43.00 HABITAT PROTECTION, INC NOV 24-PEST/RODENT CONTROL-MS 12/05/2024 9001826 $71.00 HABITAT PROTECTION, INC NOV 24-PEST/RODENT CONTROL-DEL MAR SHORES 12/05/2024 9001826 $43.00 HABITAT PROTECTION, INC NOV 24-PEST/RODENT CONTROL-CH 12/05/2024 9001826 $57.00 HABITAT PROTECTION, INC NOV 24-PEST/RODENT CONTROL-FC 12/05/2024 9001826 $43.00 HABITAT PROTECTION, INC NOV 24-PEST/RODENT CONTROL-TIDE PARK 12/05/2024 9001826 $65.00 HABITAT PROTECTION, INC NOV 24-PEST/RODENT CONTROL-FCCC 12/05/2024 9001826 $39.00 HABITAT PROTECTION, INC NOV 24-PEST/RODENT CONTROL-PW 12/05/2024 9001826 $71.00 HABITAT PROTECTION, INC NOV 24-PEST/RODENT CONTROL-FS 12/05/2024 9001826 $42.00 HABITAT PROTECTION, INC NOV 24-PEST/RODENT CONTROL-LCCC 12/05/2024 9001826 $71.00 W.W. GRAINGER, INC O-RING ACORN 12/05/2024 9001825 $16.77 CINTAS CORPORATION NO. 2 FIRST AID SUPPLIES-CH 12/05/2024 107543 $258.87 LEE'S LOCK & SAFE INC KEY RING/KEYS 12/05/2024 107560 $24.24 SDG&E CO INC UTILITIES: 09/07/24-11/06/24 12/05/2024 107571 $8,270.98 SDG&E CO INC UTILITIES: 10/01/24-11/06/24 12/05/2024 107571 $2,808.95 SHULTZ AUDIO VIDEO TROUBLESHOOTING SOUND/MICROPHONE MAINT 12/13/2024 9001850 $450.00 HD SUPPLY, INC. EYEWASH WALL STATION 12/13/2024 107590 $65.08 Page: 7 of 10
CONSOLIDATED ELECTRICAL DIST INC LAMPS/KITS 12/13/2024 9001842 $397.34 CONSOLIDATED ELECTRICAL DIST INC KITS 12/13/2024 9001842 $75.14 CONSOLIDATED ELECTRICAL DIST INC LAMPS 12/13/2024 9001842 $161.63 BFS GROUP OF CALIFORNIA LLC BOX CUTTER/HAMMER 12/13/2024 107586 $19.85 BFS GROUP OF CALIFORNIA LLC FLOOR TILE ADHESIVE/PAINT ROLLERS 12/13/2024 107586 $92.97 TOTAL PUBLIC FACILITIES $23,625.66
1007100 - COMMUNITY SERVICES
LINDA M SINNACHCHARIGE FACE PAINTING-11/13/24-KINDNESS DAY 11/21/2024 107499 $375.00 ROBERT PARKER MUSIC-TREE LIGHTING EVENT-12/08/24 11/27/2024 107527 $300.00 SAN DIEGO COUNTY BICYCLE COALITION BIKE EDUCATION PROGRAM-SEP-OCT 24 12/05/2024 107541 $3,400.00 TOTAL COMMUNITY SERVICES $4,075.00
1007110 - GF-RECREATION
SAM CASTELLANO 2024 HOLIDAY TREE LIGHTING-12/08/24 11/21/2024 107485 $700.00 JULIE'S PARTY PEOPLE TREE LIGHTING EVENT-12/08/24 11/21/2024 107497 $525.00 RAPHAEL'S PARTY RENTALS TREE LIGHTING EVENT-12/08/24 11/21/2024 107508 $2,332.21 DANNY J DECOSMO TRAIN RIDE-TREE LIGHTING-12/08/24 11/21/2024 107509 $1,210.00 JULIE'S PARTY PEOPLE SANTA-TREE LIGHTING EVENT-12/08/24 11/27/2024 107524 $175.00 ALEJANDRO J CARRILLO PERFORMANCE-TREE LIGHTING-12/14/24 12/13/2024 107598 $575.00 ABLE PATROL & GUARD, INC NOV 24-GUARD SVC-FCCC 12/13/2024 107577 $432.00 CALIFORNIA OFFICE CLEANING, INC NOV 24-FCCC CLEANING 12/13/2024 9001841 $450.00 H SHANE NOROOZI REIMB: TREE LIGHTING EVENT SUPPLIES 12/13/2024 107589 $117.29 TOTAL GF-RECREATION $6,516.50
1205460 - SELF INSURANCE RETENTION
GEORGE HILLS COMPANY, INC. GL CLAIMS SERVICES 11/21/2024 9001807 $255.00 GEORGE HILLS COMPANY, INC. GL CLAIMS SERVICES 11/21/2024 9001807 $418.20 PACIFIC INSURANCE NETWORK SYSTEMS, INC FY 25 SUBSCRIPTION 11/21/2024 107506 $4,300.00 TOTAL SELF INSURANCE RETENTION $4,973.20
1255465 - WORKERS COMPENSATION
CORVEL ENTERPRISE COMP INC. OCT 24- CLAIMS SERVICES 11/21/2024 107490 $250.00 RANDALL LOFTIS CLAIM 11/22/2024 1000923 $580.00
PAUL C MURPHY MD CLAIM 11/22/2024 1000921 $122.22
ELDON L FLOYD & ASSOCIATES CLAIM 11/25/2024 1000924 $137.50 RICHARD GREENFIELD, M.D., INC CLAIM 11/22/2024 1000910 $998.27 CORVEL CLAIM 11/25/2024 1000925 $82.98
CORVEL BILL REVIEW ALE 11/25/2024 1000926 $9.83
CORVEL BILL REVIEW ALE 11/22/2024 1000912 $12.48
CORVEL UTILIZATION REV 11/20/2024 1000909 $165.00
CORVEL BILL REVIEW ALE 11/22/2024 1000920 $12.48
CORVEL BILL REVIEW ALE 11/22/2024 1000922 $13.50
CORVEL UTILIZATION REV 11/26/2024 1000927 $43.00
CORVEL BILL REVIEW ALE 11/22/2024 1000911 $63.05
CORVEL BILL REVIEW ALE 11/22/2024 1000913 $12.48
CORVEL BILL REVIEW ALE 11/22/2024 1000914 $12.48
CORVEL BILL REVIEW ALE 11/22/2024 1000915 $12.48
CORVEL BILL REVIEW ALE 11/22/2024 1000916 $12.48
CORVEL BILL REVIEW ALE 11/22/2024 1000917 $12.48
CORVEL BILL REVIEW ALE 11/22/2024 1000918 $9.83
BOTTOMLINE TECHNOLOGIES CLAIM 11/27/2024 1000928 $137.50 MEDEQUIP INC CLAIM 11/22/2024 1000919 $85.00
DEPARTMENT OF INDUSTRIAL RELATIONS FY 25 OSIP WORK COMP 12/13/2024 107605 $2,226.50 TOTAL WORKERS COMPENSATION $5,011.54
Page: 8 of 10
1355450 - ASSET REPLACEMENT-INFO SYS
360 GLOBAL TECHNOLOGY LLC NOV 24-DRUPAL UPGRADE 11/21/2024 9001803 $12,230.00 TOTAL ASSET REPLACEMENT-INFO SYS $12,230.00
1356120 - ASSET REPLACEMENT-FIRE
AUTOLIFT SERVICES INC. SCBA AIR COMPRESSOR AWARD 11/21/2024 9001805 $19,316.40 TOTAL ASSET REPLACEMENT-FIRE $19,316.40
1356170 - ASSET REPLACEMENT-MARN SFTY
TELEVISION EQUIPMENT ASSOCIATES INC DIVERS KIT/ADAPTER/CONNECTOR RADIO 12/05/2024 9001836 $1,879.20 TOTAL ASSET REPLACEMENT-MARN SFTY $1,879.20
140 - FACILITIES REPLACEMENT
SEASIDE HEATING & AIR CONDITIONING FY24 HVAC REPLACEMENT RET RELEASE 12/05/2024 107572 $1,434.25 TOTAL FACILITIES REPLACEMENT $1,434.25
1605360 - OPEB OBLIGATION
MIDAMERICA DECEMBER 24 11/21/2024 9001809 $8,515.00
TOTAL OPEB OBLIGATION $8,515.00
2037510 - HIGHWAY 101 LANDSC #33
NISSHO OF CALIFORNIA OCT 24- CITY-WIDE LANDSCAPE MAINT 11/21/2024 9001811 $1,803.79 SANTA FE IRRIGATION DISTRICT 005979-000 - 09/04/24-11/01/24 11/27/2024 107530 $568.91 SANTA FE IRRIGATION DISTRICT 005979-004- 09/17/24-11/15/24 11/27/2024 107530 $751.66 SANTA FE IRRIGATION DISTRICT 007732-000- 09/17/24-11/15/24 11/27/2024 107530 $235.50 SDG&E CO INC UTILITIES: 09/07/24-11/06/24 12/05/2024 107571 $3,504.88 TOTAL HIGHWAY 101 LANDSC #33 $6,864.74
2047520 - MID 9C SANTA FE HILLS
SANTA FE HILLS HOA OCT 24-FY25 SANTA FE HILLS HOA MID 11/21/2024 9001813 $18,625.00 SANTA FE HILLS HOA NOV 24-FY25 SANTA FE HILLS HOA MID 11/21/2024 9001813 $18,625.00 SANTA FE IRRIGATION DISTRICT 005979-014-10/02/24-11/01/24 11/27/2024 107530 $1,009.36 SANTA FE IRRIGATION DISTRICT 005979-015 - 10/02/24-11/01/24 11/27/2024 107530 $662.55 SANTA FE IRRIGATION DISTRICT 005979-016 - 10/02/24-11/01/24 11/27/2024 107530 $781.08 SANTA FE IRRIGATION DISTRICT 005979-017 - 10/02/24-11/01/24 11/27/2024 107530 $48.81 SANTA FE IRRIGATION DISTRICT 005979-018 - 10/02/24-11/01/24 11/27/2024 107530 $119.05 SANTA FE IRRIGATION DISTRICT 005979-019 - 10/02/24-11/01/24 11/27/2024 107530 $338.55 SANTA FE IRRIGATION DISTRICT 005979-020 - 10/02/24-11/01/24 11/27/2024 107530 $688.89 SANTA FE IRRIGATION DISTRICT 005979-021 - 10/02/24-11/01/24 11/27/2024 107530 $1,285.93 SANTA FE IRRIGATION DISTRICT 005979-022 - 10/02/24-11/01/24 11/27/2024 107530 $1,044.48 SANTA FE IRRIGATION DISTRICT 005979-023 - 10/02/24-11/01/24 11/27/2024 107530 $890.83 SANTA FE IRRIGATION DISTRICT 005979-024 - 10/02/24-11/01/24 11/27/2024 107530 $767.91 SANTA FE IRRIGATION DISTRICT 005979-025 - 10/02/24-11/01/24 11/27/2024 107530 $724.01 SANTA FE IRRIGATION DISTRICT 005979-026 - 10/02/24-11/01/24 11/27/2024 107530 $1,009.36 SANTA FE HILLS HOA FY 24-SURPLUS FUNDS 12/05/2024 9001834 $99,140.38 SANTA FE HILLS HOA DEC 24- SANTA FE HILLS HOA MID 12/13/2024 9001847 $18,625.00 TOTAL MID 9C SANTA FE HILLS $164,386.19
2057530 - MID 9E ISLA VERDE
ISLA VERDE HOA OCT 24-FY25 ISLA VERDE HOA MID 11/21/2024 107496 $433.33 ISLA VERDE HOA NOV 24-FY25 ISLA VERDE HOA MID 11/21/2024 107496 $433.33 ISLA VERDE HOA DEC 24- ISLA VERDE HOA MID 12/13/2024 107594 $433.33 TOTAL MID 9E ISLA VERDE $1,299.99
2077550 - MID 9H SAN ELIJO #2
SAN ELIJO HILLS II HOA OCT 24-FY25 SAN ELIJO HOA MID 11/21/2024 107511 $11,100.00 SAN ELIJO HILLS II HOA NOV 24-FY25 SAN ELIJO HOA MID 11/21/2024 107511 $11,100.00 SAN ELIJO HILLS II HOA DEC 24- SAN ELIJO HOA MID 12/13/2024 107603 $11,100.00 Page: 9 of 10
TOTAL MID 9H SAN ELIJO #2 $33,300.00
2087580 - COASTAL RAIL TRAIL MAINT
NISSHO OF CALIFORNIA OCT 24- CITY-WIDE LANDSCAPE MAINT 11/21/2024 9001811 $7,240.55 SANTA FE IRRIGATION DISTRICT 005506-020 - 10/02/24-11/01/24 11/27/2024 107530 $2,715.58 SANTA FE IRRIGATION DISTRICT 005506-003 - 09/04/24-11/01/24 11/27/2024 107530 $157.11 TOTAL COASTAL RAIL TRAIL MAINT $10,113.24
2117600 - STREET LIGHTING DISTRICT
VERIZON WIRELESS-SD 362455526-00001 - 10/02/24-11/01/24 11/21/2024 107517 $15.17 SDG&E CO INC UTILITIES: 10/01/24-11/06/24 12/05/2024 107571 $9,122.64 TOTAL STREET LIGHTING DISTRICT $9,137.81
2135550 - DEVELOPER PASS-THRU- PLANNING
TELECOM LAW FIRM DRP24-002-THIRD PARTY REVIEW 11/21/2024 107516 $2,645.00 HELIX ENVIRONMENTAL NOV 24-DRP24-001 THIRD PARTY REVIEW 12/13/2024 107591 $1,232.50 LAURIE LEVINE NOV 24-LANDSCAPE PLAN REVIEW & INSPECTIONS 12/13/2024 9001844 $568.75 LAURIE LEVINE NOV 24-LANDSCAPE PLAN REVIEW & INSPECTIONS 12/13/2024 9001844 $175.00 LAURIE LEVINE NOV 24-LANDSCAPE PLAN REVIEW & INSPECTIONS 12/13/2024 9001844 $743.75 LAURIE LEVINE NOV 24-LANDSCAPE PLAN REVIEW & INSPECTIONS 12/13/2024 9001844 $437.50 LAURIE LEVINE NOV 24-LANDSCAPE PLAN REVIEW & INSPECTIONS 12/13/2024 9001844 $481.25 LAURIE LEVINE NOV 24-LANDSCAPE PLAN REVIEW & INSPECTIONS 12/13/2024 9001844 $568.75 LAURIE LEVINE NOV 24-LANDSCAPE PLAN REVIEW & INSPECTIONS 12/13/2024 9001844 $700.00 LAURIE LEVINE NOV 24-LANDSCAPE PLAN REVIEW & INSPECTIONS 12/13/2024 9001844 $656.25 TOTAL DEVELOPER PASS-THRU- PLANNING $8,208.75
2146120 - FIRE MITIGATION FEES
ACE UNIFORMS LLC BOOTS 12/05/2024 9001821 $205.66
ACE UNIFORMS LLC BOOTS 12/05/2024 9001821 $378.82
TOTAL FIRE MITIGATION FEES $584.48
2196110 - COPS PROGRAM
SAN DIEGO COUNTY SHERIFF'S DEPT. JUL 24-LAW ENFORCEMENT SVC 11/21/2024 107510 $162,576.04 SAN DIEGO COUNTY SHERIFF'S DEPT. SEP 24-LAW ENFORCEMENT SVC & LPR ANNL

SOFTWARE
11/21/2024 107510 $24,000.00
TOTAL COPS PROGRAM $186,576.04
2465200 - MISC GRANTS - CM
SOLANA CENTER FOR ENVIRONMENTAL OCT 24-SB1383 FOOD RECOVERY 11/21/2024 9001815 $4,105.92 STAPLES CONTRACT & COMMERCIAL COMPOST BIN/TRASH BAGS/BAMBOO KNIVES 11/21/2024 107514 $310.77 TOTAL MISC GRANTS - CM $4,416.69
2706120 - PUBLIC SAFETY- FIRE
VERIZON WIRELESS-SD 962428212-00001 - 09/29/24-10/28/24 11/21/2024 107517 $114.03 CARDIO PARTNERS INC CSA.17-AED'S BATTERY /REFRESH PK/ELECTRODES 12/05/2024 9001823 $1,095.76 THE COUNSELING TEAM INTERNATIONAL MENTAL WELLNESS SVC - FIRE 12/13/2024 107600 $468.00 THE COUNSELING TEAM INTERNATIONAL DEC 24-MENTAL WELLNESS SVC - FIRE 12/13/2024 107600 $468.00 TOTAL PUBLIC SAFETY- FIRE $2,145.79
3207220 - CAPITAL LEASE FUND
CITY NATIONAL BANK CHVRON#12-015: 12/08 11/21/2024 107486 $31,216.81 CITY NATIONAL BANK CHVRON#12-015: 12/08 11/21/2024 107486 $3,970.20 TOTAL CAPITAL LEASE FUND $35,187.01
4506190 - SAND REPLNSHMNT/RETENTION
SUMMIT ENVIROMENTAL GROUP, INC. NOV 24-9926 PRO SVC 12/13/2024 9001852 $560.00 WARWICK GROUP CONSULTANTS, LLC NOV 24-CONSULTING SERVICES 12/13/2024 9001854 $5,833.00 TOTAL SAND REPLNSHMNT/RETENTION $6,393.00
459 - MISC. CAPITAL PROJECTS
Page: 10 of 10
A PREMAN ROOFING INC FCCC & MS ROOF REPLACEMENT RET RLS 12/05/2024 107534 $3,305.65 A PREMAN ROOFING INC FCCC & MS ROOF REPLACEMENT RET RLS 12/05/2024 107534 $16,154.24 TOTAL MISC. CAPITAL PROJECTS $19,459.89
4596510 - MISC.CAPITALPROJECTS-ENG
VAN DYKE LANDSCAPE ARCHITECTS OCT 24-LA COLONIA MASTER PLAN UPDATE 12/05/2024 107576 $800.00 LA JOLLA STONE ETCHING ENGRAVED TILE 12/05/2024 107559 $720.00 TOTAL MISC.CAPITALPROJECTS-ENG $1,520.00
4728520 - PACIFIC UNDERGROUNDNG-CIP
NV5, INC. OCT 24-PROF SVC 12/05/2024 107564 $500.00
TOTAL PACIFIC UNDERGROUNDNG-CIP $500.00
5097700 - SANITATION
MISSION LINEN & UNIFORM INC FY25 UNIFORM SERVICES FOR PUBLIC WORKS 11/21/2024 107501 $9.26 VERIZON WIRELESS-SD 362455526-00001 - 10/02/24-11/01/24 11/21/2024 107517 $15.17 IDRAINS LLC C- SEWER-STORMDRAIN MAINT - 22123 11/21/2024 107481 $13,937.49 WEX FLEET UNIVERSAL 10/08/24-11/07/24-AUTO FUEL 11/27/2024 107533 $240.93 SANTA FE IRRIGATION DISTRICT 005506-014-10/02/24-11/01/24 11/27/2024 107530 $632.92 MISSION LINEN & UNIFORM INC FY25 UNIFORM SERVICES FOR PUBLIC WORKS 12/05/2024 107563 $9.26 IDRAINS LLC 3 MNTH JETTER SVC-CH 12/05/2024 107535 $525.00 IDRAINS LLC 3 MNTH JETTER SVC-LCCC 12/05/2024 107535 $525.00 IDRAINS LLC 3 MNTH JETTER SVC-FS 12/05/2024 107535 $525.00 IDRAINS LLC 3 MNTH JETTER SVC-LG STATION 12/05/2024 107535 $525.00 MISSION LINEN & UNIFORM INC FY25 UNIFORM SERVICES FOR PUBLIC WORKS 12/05/2024 107563 $9.26 AT&T CALNET 3 9391012277 - 10/24/24-11/23/24 12/05/2024 107540 $19.26 IDRAINS LLC J-SEWER VACUUM 12/13/2024 107578 $675.00
IDRAINS LLC Y - MARK OUT SEWER 12/13/2024 107578 $1,300.00 MISSION LINEN & UNIFORM INC FY25 UNIFORM SERVICES FOR PUBLIC WORKS 12/13/2024 107599 $9.25 DEL MAR BLUE PRINT COMPANY, INC. BLACK & WHITE PRINT SCANS 12/13/2024 107585 $35.77 RAFTELIS FINANCIAL CONSULTANTS, INC NOV 24-SEWER RATE & REVENUE PLAN STUDY 12/13/2024 107602 $7,917.50 TOTAL SANITATION $26,911.07
6527810 - SUCCESSOR AGENCY
DAVIS FARR, LLP FY24 AUDIT SERVICES-JUN-OCT 24 11/21/2024 107491 $1,500.00 TOTAL SUCCESSOR AGENCY $1,500.00
6718510 - BARBARA UNDERGROUNDING-DS
WILLDAN FY25 Q2-LOCAL IMPROVEMENT DISTRICT 12/13/2024 9001855 $352.89 TOTAL BARBARA UNDERGROUNDING-DS $352.89
6728520 - PACIFIC UNDERGROUNDING-DS
WILLDAN FY25 Q2-LOCAL IMPROVEMENT DISTRICT 12/13/2024 9001855 $280.33 TOTAL PACIFIC UNDERGROUNDING-DS $280.33
6738530 - MARSOLAN UNDERGROUNDNG-DS
COMPUTERSHARE CORPORATE TRUST FY 25 SOBEACH1106 ADMIN CHARGE 11/21/2024 107489 $450.00 WILLDAN FY25 Q2-LOCAL IMPROVEMENT DISTRICT 12/13/2024 9001855 $273.83 TOTAL MARSOLAN UNDERGROUNDNG-DS $723.83
REPORT TOTAL: $2,166,741.73
SUCCESSOR AGENCY ACTION: _________
______________________________________________________________________ _____________________________________________________________ AGENDA ITEM # A.3.

STAFF REPORT

CITY OF SOLANA BEACH/SOLANA

BEACH SUCCESSOR AGENCY
TO: Honorable Mayor/Chair and City Councilmembers/Directors FROM: Alyssa Muto, City Manager/Executive Director
MEETING DATE: January 15, 2025
ORIGINATING DEPT: Finance Department – Rachel Jacobs, Finance Director SUBJECT: City Council/Successor Agency Consideration of Resolution SA-033 Approving the Administrative Budget
and Resolution SA-034 Approving the Recognized
Obligation Payment Schedule (ROPS) Both for the Period
July 1, 2025 to June 30, 2026
BACKGROUND:

As of February 1, 2012, the Solana Beach Redevelopment Agency (the “Agency”) was dissolved pursuant to Assembly Bill (AB) 1x26, which was found to be constitutional by the California Supreme Court in its decision in the California Redevelopment Association v. Matosantos case. Prior to the dissolution of the Agency, on January 11, 2012, the City Council adopted Resolution 2012-011, electing to become the Successor Agency (SA) to the Agency. Included as part of this legislation was the formation of a Countywide Oversight Board (OB) to replace all local Oversight Boards for each city’s SA to be effective July 1, 2016. However, Senate Bill (SB) 107 delayed the formation of this Countywide OB until July 1, 2018.

On June 27, 2012, as part of the Fiscal Year (FY) 2012/13 State budget package, the Legislature passed, and the Governor signed, AB 1484, the primary purpose of which was to make technical and substantive amendments to AB 1x26, and SB 107 (collectively referred to as the "Dissolution Laws"), based on experience at the State and local level in implementing that AB 1x26. AB 1484 made several changes to the process and timing for preparation and approval of a SA’s Recognized Obligation Payment Schedule (ROPS). The ROPS sets forth the payment amounts needed for the SA to meet its outstanding enforceable obligations for each fiscal year period until all outstanding debt and obligations are paid.

As part of the FY 2015/16 State budget package, the Legislature passed Senate Bill (SB) 107. As a budget "trailer bill", SB 107 took immediate effect upon signature by the Governor on September 22, 2015. The primary purpose of SB 107 was to make technical January 15, 2025
Successor Agency ROPS 25-26 and Administrative Budget

Page 2 of 5 ends

and substantive amendments to the existing Dissolution Laws including requiring an annual rather than a biannual ROPS and new administrative cost allocation formulas.

This item is before the City Council, in its capacity as the SA, for consideration of Resolution SA-033 (Attachment 1) approving the SA’s Administrative Budget for the period of July 1, 2025, to June 30, 2026, and Resolution SA-034 (Attachment 2) approving the ROPS 25-26 for the period of July 1, 2025, to June 30, 2026.

DISCUSSION:

Recognized Obligation Payment Schedule (ROPS)
As noted above, the ROPS sets forth the payment amounts needed for the SA to meet its outstanding enforceable obligations for each fiscal year period until all outstanding debt and obligations are paid. The ROPS 25-26 will cover the twelve-month enforceable obligation payment cycle under the Dissolution Laws and will control distributions from the Redevelopment Property Tax Trust Fund ("RPTTF") to pay enforceable obligations during the period from July 2025, through June 2026. The enforceable obligations in Solana Beach consist primarily of bond payments (which includes $200,798 in annual bond debt service and $7,200 in related fees) and payments for legal services for the “The Affordable Housing Coalition of San Diego v Sandoval, et al” and “San Diego County Board of Education (SDCBofE), et al vs Sandoval, et al” cases (which totals $10,000) and the requested administrative budget of $33,650. For the ROPS 25-26 period, enforceable obligations for which RPTTF will be requested totals $251,648.

The ROPS 25-26 must be prepared on a template form released by the Department of Finance (DOF) and must be approved by the SA’s Oversight Board and transmitted to the DOF and other specified recipients by February 1, 2025. As previously noted, beginning with the ROPS 19-20 there is one Countywide Oversight Board as opposed to individual Oversight Boards for each successor agency. The DOF must approve or disapprove the various enforceable obligations (including payment amounts and funding sources) set forth on an oversight board-approved ROPS 25-26 by April 15, 2025. If necessary, the SA then has five (5) business days to request a "meet and confer" session with the DOF to seek reconsideration by the DOF of any disputed enforceable obligation items.

The DOF meet and confers will generally occur within the following 30-day period, with the DOF required to provide its final determination on ROPS 25-26 enforceable obligations by May 17, 2025 (14 days prior to the next RPTTF distribution). The ROPS 25-26 preparation and approval process will culminate this year with a June 1, 2025, distribution to the SA of RPTTF funds by each county auditor-controller to cover specified administrative costs and for payment of upcoming enforceable obligations during July 2025 through June 2026, along with RPTTF pass-through payments and the distribution of any remaining residual RPTTF funds to other affected taxing entities.

The ROPS 25-26 will be submitted to the Oversight Board for approval at their regular meeting on January 16, 2025, with a subsequent submission to the DOF by the February 1, 2025, deadline.

January 15, 2025
Successor Agency ROPS 25-26 and Administrative Budget

Page 3 of 5 ends

The ROPS 25-26 consists entirely of items included on ROPS 24-25 and previously approved by the DOF.

If necessary, pursuant to SB 107, the annual ROPS can only be amended once and no later than October 1st of a given fiscal year.

Successor Agency Administrative Budget and Administrative Cost Allowance Pursuant to the Dissolution Laws, the SA must also prepare an Administrative Budget for the fiscal year for approval by the Oversight Board. Before the passage of SB 107, the SA was entitled to an Administrative Cost Allowance for a fiscal year equal to the greater of $250,000 or 3% of the RPTTF received by the SA from the County Auditor-Controller to make enforceable obligation payments during the fiscal year. In the case of Solana Beach, prior to the passage of SB 107, the SA typically received $250,000 annually or $125,000 for each six-month ROPS period.

Beginning July 1, 2016, the Administrative Cost Allowance is the greater of $250,000 or up to 3% of the actual RPTTF distributed to the successor agency in the preceding fiscal year, reduced by the SA’s Administrative Cost Allowance. However, in no case can the Administrative Cost Allowance exceed 50% of the total RPTTF to pay enforceable obligations in the preceding fiscal year, reduced by administrative costs paid for by RPTTF. In Solana Beach, under the 50% formula, the maximum Administrative Cost Allowance would be $104,267 for the upcoming ROPS period. Last year, or FY 2024/25, the City requested and was approved for $63,284 based on projected SA administrative expenditures.

The Administrative Cost Allowance calculation for the period of July 1, 2025, to June 30, 2026, using the criteria in the paragraph above, is shown in the Administrative Cost Allowance (ACA) for ROPS 25-26 table in Attachment 3.

This Administrative Budget must include:
• Estimated amounts for SA administrative costs for the upcoming two six-month periods.
• Proposed sources of payment for such administrative costs, which may include the Administrative Cost Allowance described below, as well as other eligible sources available to the SA.
• Proposals for arrangements for administrative/operations services to be provided to the SA by the Sponsoring Community or other entity.

The Administrative Budget for the period of July 1, 2025, to June 30, 2026, is prepared in conjunction with the ROPS for the same time period. Though the SA can request up to $104,267 as an Administrative Cost Allowance, the SA is requesting an amount of $33,650 for the Administrative Budget for July 1, 2025, to June 30, 2026. The Administrative Budget includes $18,000 for Staff salary and benefits to reimburse the City of Solana Beach (City) for Staff work, $5,500 for legal and audit professional services, January 15, 2025
Successor Agency ROPS 25-26 and Administrative Budget

Page 4 of 5 ends

$500 for materials and supplies, and $9,650 for related costs based on the City’s cost allocation plan that are based on a City-wide allocation of Staff salary and benefits.

The requested Administrative Budget amount of $33,650 for FY 2025/26 is less than the $63,284 amount requested in FY 2024/25 primarily due adjustment in Staff payroll allocations and updated cost allocation plan.

The Administrative Budget will also be submitted to the Oversight Board for approval at a regular meeting on January 16, 2025. The administrative budget is no longer required to be submitted to the DOF for their approval.

CEQA COMPLIANCE STATEMENT:

Not a project as defined by CEQA.

FISCAL IMPACT:

For the ROPS 25-26 period, enforceable obligations for which RPTTF will be requested totals $251,648. This amount includes $200,798 of bond debt service payments, $7,200 of bond-related fees, and $10,000 of Dissolution Laws Litigation costs. The Administrative Cost Allowance requested is $33,650.

WORK PLAN:

N/A
OPTIONS:
∙ Approve Staff recommendation.
∙ Approve Staff recommendation with alternative amendments/modifications. ∙ Provide direction and feedback.

CITY STAFF RECOMMENDATION:

Staff recommends that the Successor Agency:

1. Receive the Successor Agency’s enforceable obligations payment information and administrative budget for the period July 1, 2025, to June 30, 2026.

2. Adopt Resolution SA-033 approving the SA Administrative Budget for July 1, 2025, to June 30, 2026.

January 15, 2025
Successor Agency ROPS 25-26 and Administrative Budget

Page 5 of 5 ends

3. Adopt Resolution SA-034 approving the ROPS 25-26 for July 1, 2025, to June 30, 2026.
_______________________________________
Alyssa Muto, City Manager/Executive Director
Attachments:

1. Resolution SA-033

2. Resolution SA-034

3. Administrative Cost Allowance (ACA) for ROPS 25-26
RESOLUTION SA-033

RESOLUTION OF THE SUCCESSOR AGENCY FOR THE SOLANA

BEACH REDEVELOPMENT AGENCY APPROVING THE SUCCESSOR
AGENCY ADMINISTRATIVE BUDGET FOR FISCAL YEAR 2025/26 AND

REQUESTING OVERSIGHT BOARD APPROVAL
WHEREAS, on December 29, 2011, the California Supreme Court delivered its decision in California Redevelopment Association v. Matosantos, finding Assembly Bill 1X26 (the "Dissolution Act") largely constitutional; and WHEREAS, under the Dissolution Act and the California Supreme Court's decision in California Redevelopment Association v. Matosantos, all California redevelopment agencies, including the Solana Beach Redevelopment Agency (the "Former RDA"), were dissolved on February 1, 2012, and successor agencies were designated and vested with the responsibility of winding down the business and fiscal affairs of the former redevelopment agencies; and
WHEREAS, on January 11, 2012, the City Council of the City of Solana Beach adopted Resolution No. 2012-011 accepting for the City the role of Successor Agency to the Former RDA (the "Successor Agency"); and
WHEREAS, under the Dissolution Act, an oversight board is established for each successor agency to a former redevelopment agency with the responsibility of overseeing the activities of the successor agency and approving certain actions of the successor agency in connection with the successor agency's wind down of the affairs of the former redevelopment agency; and
WHEREAS, the oversight board (the "Oversight Board") for the Successor Agency has been duly constituted pursuant to the Dissolution Act: and WHEREAS, Health & Safety Code Section 34177(j) requires the Successor Agency to prepare an Administrative Budget for Fiscal Year 2025/26 and to submit it to the Oversight Board for approval; and
WHEREAS, an Administrative Budget for Fiscal Year 2025/26 has been prepared in conformance with State law and has been presented to the Successor Agency.

NOW, THEREFORE, BE IT RESOLVED, by the Successor Agency for the Solana Beach Redevelopment Agency, as follows:

Section 1. Recitals Correct. The Successor Agency finds that the above Recitals are true and correct and have served as the basis for the findings and approvals set forth below.

Section 2. Approval of Administrative Budget for Fiscal Year 2025/26. The Successor Agency hereby approves the Administrative Budget for Fiscal Year 2025/26, attached hereto as Exhibit A.

Resolution SA-033
Approval of Administrative Budget for FY 2025/26

Page 2 of 2 ends

Section 3. Request for Oversight Board Approval of Administrative Budget.

The Successor Agency hereby requests the Oversight Board to approve the Administrative Budget for Fiscal Year 2025/26, attached hereto as Exhibit A.

Section 4. California Environmental Quality Act. The Successor Agency determines that the activity approved by this Resolution is not a “project” for purposes of CEQA, as that term is defined by Guidelines Section 15378, because this Resolution is an organizational or administrative activity that will not result in a direct or indirect physical change in the environment, per Section 15378(b)(5) of the Guidelines.

Section 5. Further Actions and Documents. The Executive Director or designee, following consultation with the Agency Counsel, is authorized to take all actions and execute all documents on behalf of the Successor Agency necessary to effectuate the purpose of this Resolution.

Section 6. Severability. If any provision of this Resolution or the application of any such provision to any person or circumstance is held invalid, such invalidity shall not affect other provisions or applications of this Resolution that can be given effect without the invalid provision or application, and to this end the provisions of this Resolution are severable. The Successor Agency declares that its board would have adopted this Resolution irrespective of the invalidity of any particular portion of this Resolution.

Section 7. Effective Date. This Resolution shall become effective immediately upon its passage and adoption.

PASSED, APPROVED, AND ADOPTED by the Successor Agency to the Solana Beach Redevelopment Agency at its meeting held on the 15th day of January 2025, by the following vote:

AYES: Board Member –
NOES: Board Member –
ABSENT: Board Member –
ABSTAIN: Board Member –
_______________________________
LESA HEEBNER, Chair
APPROVED AS TO FORM: ATTEST:
________________________________ ________________________________ JOHANNA N. CANLAS, Agency Counsel ANGELA IVEY, Agency Secretary Expenditure Category Payee Description
Salary/Benefits Various Employee Salaries and Benefits 18,000 Legal Services Burke Williams Sorensen LLP, et al Contract for Professional Services-Legal 1,000 Legal Services Goldfarb & Lipman Contract for Professional Services-Legal 500 Audit Davis Farr Contract for Professional Services-Audit 4,000 Material, Supplies, & Services Various Costs - material, supplies and services expenditure categories 500 Administrative Charges City of Solana Beach Successor Agency share of City's overhead costs 5,000 Claims Liability Charges City of Solana Beach Successor Agency share of City's self-insured liability 850 Workers Comp Charges City of Solana Beach Successor Agency share of City's workers comp liability 550 Pension Trust Charges City of Solana Beach Successor Agency share of City's pension trust liability 1,250 OPEB Trust Charges City of Solana Beach Successor Agency share of City's OPEB liability 2,000 TOTAL $ 33,650

2. Activities may be added, revised, or deleted from this listing as needed during the RDA dissolution process.

3. Costs shown for each activity are estimates only. Actual costs required for each activity may be higher or lower than the amount shown, not to exceed the TOTAL maximum amount shown.

Amount

1. The Successor Agency has arranged with the City of Solana Beach to provide the staff, material, and equipment needed to administer the Successor

SUCCESSOR AGENCY OF THE REDEVELOPMENT AGENCY OF THE CITY OF SOLANA BEACH

ADMINISTRATIVE BUDGET
July 1, 2025 to June 30, 2026

RESOLUTION SA-034

RESOLUTION OF THE SUCCESSOR AGENCY FOR THE SOLANA

BEACH REDEVELOPMENT AGENCY APPROVING THE RECOGNIZED
OBLIGATION PAYMENT SCHEDULE FOR FISCAL YEAR 2025/26 AND

REQUESTING OVERSIGHT BOARD APPROVAL
WHEREAS, on December 29, 2011, the California Supreme Court delivered its decision in California Redevelopment Association v. Matosantos, finding Assembly Bill 1X26 (the "Dissolution Act") largely constitutional; and WHEREAS, under the Dissolution Act and the California Supreme Court's decision in California Redevelopment Association v. Matosantos, all California redevelopment agencies, including the Solana Beach Redevelopment Agency (the "Former RDA"), were dissolved on February 1, 2012, and successor agencies were designated and vested with the responsibility of winding down the business and fiscal affairs of the former redevelopment agencies; and
WHEREAS, on January 11, 2012, the City Council of the City of Solana Beach adopted Resolution No. 2012-011 accepting for the City the role of Successor Agency to the Former RDA (the "Successor Agency"); and
WHEREAS, under the Dissolution Act, an oversight board is established for each successor agency to a former redevelopment agency with the responsibility of overseeing the activities of the successor agency and approving certain actions of the successor agency in connection with the successor agency's wind down of the affairs of the former redevelopment agency; and
WHEREAS, the oversight board (the "Oversight Board") for the Successor Agency has been duly constituted pursuant to the Dissolution Act: and WHEREAS, Health & Safety Code Sections 34177(l) and 34177(o) require the Successor Agency to submit a Recognized Obligation Payment Schedule ("ROPS") for fiscal year 2025/26 to the San Diego County Auditor-Controller and the California Department of Finance by February 1, 2025, after approval by the Oversight Board; and WHEREAS, a ROPS for Fiscal Year 2025/26 has been prepared in conformance with State law and has been presented to the Successor Agency.

NOW, THEREFORE, BE IT RESOLVED, by the Successor Agency for the Solana Beach Redevelopment Agency, as follows:

Section 1. Recitals Correct. The Successor Agency finds that the above Recitals are true and correct and have served as the basis for the findings and approvals set forth below.

Section 2. Approval of ROPS for Fiscal Year 2025/26. The Successor Agency hereby approves the Recognized Obligation Payment Schedule for Fiscal Year 2025/26, attached hereto as Exhibit A.

Resolution SA-034
Approval of ROPS for FY 2025/26

Page 2 of 2 ends

Section 3. Request for Oversight Board Approval of ROPS. The Successor Agency hereby requests the Oversight Board to approve the Recognized Obligation Payment Schedule for Fiscal Year 2025/26, attached hereto as Exhibit A.

Section 4. California Environmental Quality Act. The Successor Agency determines that the activity approved by this Resolution is not a “project” for purposes of CEQA, as that term is defined by Guidelines Section 15378, because this Resolution is an organizational or administrative activity that will not result in a direct or indirect physical change in the environment, per Section 15378(b)(5) of the Guidelines.

Section 5. Further Actions and Documents. The Executive Director or designee, following consultation with the Agency Counsel, is authorized to take all actions and execute all documents on behalf of the Successor Agency necessary to effectuate the purpose of this Resolution.

Section 6. Severability. If any provision of this Resolution or the application of any such provision to any person or circumstance is held invalid, such invalidity shall not affect other provisions or applications of this Resolution that can be given effect without the invalid provision or application, and to this end the provisions of this Resolution are severable. The Successor Agency declares that its board would have adopted this Resolution irrespective of the invalidity of any particular portion of this Resolution.

Section 7. Effective Date. This Resolution shall become effective immediately upon its passage and adoption.

PASSED, APPROVED, AND ADOPTED by the Successor Agency to the Solana Beach Redevelopment Agency at its meeting held on the 15th day of January 2025, by the following vote:

AYES: Board Member –
NOES: Board Member –
ABSENT: Board Member –
ABSTAIN: Board Member –
_______________________________
LESA HEEBNER, Chair
APPROVED AS TO FORM: ATTEST:
________________________________ ________________________________ JOHANNA N. CANLAS, Agency Counsel ANGELA IVEY, Agency Secretary Recognized Obligation Payment Schedule (ROPS 25-26) - Summary Filed for the July 1, 2025 through June 30, 2026 Period Successor Agency: Solana Beach
County: San Diego
Current Period Requested Funding for Enforceable
Obligations (ROPS Detail)
25-26A Total
(July -
December)
25-26B Total
(January -
June)
ROPS 25-26
Total
A Enforceable Obligations Funded as Follows (B+C+D) $ - $ - $ - B Bond Proceeds - - -
C Reserve Balance - - -
D Other Funds - - -
E Redevelopment Property Tax Trust Fund (RPTTF) (F+G) $ 125,824 $ 125,824 $ 251,648 F RPTTF 108,999 108,999 217,998
G Administrative RPTTF 16,825 16,825 33,650
H Current Period Enforceable Obligations (A+E) $ 125,824 $ 125,824 $ 251,648 Certification of Oversight Board Chairman:

Name Title
Pursuant to Section 34177 (o) of the Health and Safety
code, I hereby certify that the above is a true and
accurate Recognized Obligation Payment Schedule for
the above named successor agency. /s/
Signature Date
Solana Beach
Recognized Obligation Payment Schedule (ROPS 25-26) - ROPS Detail July 1, 2025 through June 30, 2026

A B C D E F G H I J K L M N O P Q R S T U V W
Item
# Project Name Obligation Type
Agreement
Execution
Date
Agreement
Termination
Date
Payee Description Project Area
Total
Outstanding
Obligation
Retired
ROPS
25-26
Total
ROPS 25-26A (Jul - Dec)
25-26A
Total
ROPS 25-26B (Jan - Jun)
25-26B
Total
Fund Sources Fund Sources
Bond
Proceeds
Reserve
Balance
Other
Funds RPTTF Admin RPTTF
Bond
Proceeds
Reserve
Balance
Other
Funds
RPTTF
Admin
RPTTF
$3,783,932 $251,648 $- $- $- $108,999 $16,825 $125,824 $- $- $- $108,999 $16,825 $125,824 2 Trustee
Services
Fees 06/01/
2006
12/01/2035 ComputerShare Contract for
Professional ServicesTrustee Services
Solana Beach
Redevelopment
Project
44,000 N $4,000 - - - 2,000 - $2,000 - - - 2,000 - $2,000 3 Continuing
Disclosure
Fees 06/01/
2006
12/01/2035 Urban Futures Contract for
Professional ServicesContinuing Disclosure
Solana Beach
Redevelopment
Project
30,900 N $2,200 - - - 1,100 - $1,100 - - - 1,100 - $1,100 4 Arbitrage Fees 06/01/
2006
12/01/2035 Koppel and
Gruber
Contract for
Professional Services -
Arbitrage
Solana Beach
Redevelopment
Project
9,900 N $1,000 - - - 500 - $500 - - - 500 - $500
21 Legal
Services
Litigation 01/01/
2014
12/01/2035 Burke Williams
Sorensen LLP
(BWS LLP),
Solana Beach
Successor
Agency
Defend Third Party
litigation against
Successor Agency
regarding case: "The
Affordable Housing
Coalition of San Diego
v Sandoval, et al."
Case No.
34-2012-80001158-CUWM-GDS
Solana Beach
Redevelopment
Project
100,000 N $5,000 - - - 2,500 - $2,500 - - - 2,500 - $2,500 22 Successor
Agency
Administrative
Expenses
Admin
Costs
01/01/
2014
12/01/2035 City of Solana
Beach
Successor Agency
administrative
obligations relating to
maintaining payments
on enforceable
obligations and other
activities as required by
AB1X26
Solana Beach
Redevelopment
Project
1,390,843 N $33,650 - - - - 16,825 $16,825 - - - - 16,825 $16,825 24 2017 Tax
Allocation
Refunding
Bond
Bonds
Issued
After 12/
31/10
11/10/
2017
12/01/2035 ComputerShare Refunding of 2006 Tax
Allocation Bonds that
were used to fund
Public Improvements
2,108,289 N $200,798 - - - 100,399 - $100,399 - - - 100,399 - $100,399 25 Legal
Services
Litigation 01/01/
2017
12/01/2035 Burke Williams
Sorensen LLP
(BWS LLP),
Colantuono,
Highsmith &
Whatley, PC,
and Solana
Beach SA
Defend Third Party
litigation against
Successor Agency
regarding case: "San
Diego County Board of
Education, et al v
Sandoval, et al." Case
No.
37-2017-00019775-CUWM-CTL
100,000 N $5,000 - - - 2,500 - $2,500 - - - 2,500 - $2,500 Solana Beach
Recognized Obligation Payment Schedule (ROPS 25-26) - Report of Cash Balances July 1, 2022 through June 30, 2023
(Report Amounts in Whole Dollars)
Pursuant to Health and Safety Code section 34177 (l), Redevelopment Property Tax Trust Fund (RPTTF) may be listed as a source of payment on the ROPS, but only to the extent no other funding source is available or when payment from property tax revenues is required by an enforceable obligation.

A B C D E F G H
ROPS 22-23 Cash Balances
(07/01/22 - 06/30/23)
Fund Sources
Comments
Bond Proceeds Reserve Balance Other Funds RPTTF
Bonds issued
on or before
12/31/10
Bonds issued
on or after
01/01/11
Prior ROPS
RPTTF and
Reserve
Balances retained
for future
period(s)
Rent, grants,
interest, etc.

Non-Admin
and Admin
1 Beginning Available Cash Balance (Actual 07/01/22)
RPTTF amount should exclude "A" period distribution
amount.
93,027 18-19, 19-20, 20-21, 21-22 PPA
2 Revenue/Income (Actual 06/30/23)
RPTTF amount should tie to the ROPS 22-23 total
distribution from the County Auditor-Controller
299,237 22-23 ROPS letter
3 Expenditures for ROPS 22-23 Enforceable Obligations
(Actual 06/30/23)
243,533 22-23 Actuals
4 Retention of Available Cash Balance (Actual 06/30/23) RPTTF amount retained should only include the amounts
distributed as reserve for future period(s)
61,927 19-20, 20-21, 21-22 PPA
5 ROPS 22-23 RPTTF Prior Period Adjustment
RPTTF amount should tie to the Agency's ROPS 22-23 PPA
form submitted to the CAC
No entry required 57,435 22-23 PPA
6 Ending Actual Available Cash Balance (06/30/23)
C to F = (1 + 2 - 3 - 4), G = (1 + 2 - 3 - 4 - 5)
$- $- $- $- $29,369
Solana Beach
Recognized Obligation Payment Schedule (ROPS 25-26) - Notes July 1, 2025 through June 30, 2026
Item # Notes/Comments
2 3
4 21
22 24
25 I
·······························-······················································································································································································································································································································ •··•·•···•·••·••••·••····•··•·•·•••••••·•·········•••••••·••·•·•••·····••••••••·•·•···•·•··•·••••·•··•·•···•·•·••••••••·····•·•·•·••·•••••••·········•·••••••••·•·•···•···••·••••·••·•···•·•····••••••··•·•·•••·•·••·••••••····•···•·•·••••••••·•····•··•·•·••••••••·•···•···•·••••••••·•·•·•••·····••••••••·•·•·•·•·•··•·••••·•··•·••··•·•·••••••••·····•·•·•·••·•••••••····•• A July to Dec RPTTF Distribution $ 115,407
B Jan to June RPTTF Distribution 156,410
C = A+B Actual RPTTF Distributed Prior Fiscal Year (2024/25) $ 271,817 D Less: Prior Fiscal Year Administrative Cost Allowance 63,284 E=C-D Adjusted RPTTF Distribution Prior Fiscal Year $ 208,533 Multiply Adjusted RPTTF by 3% 3%
F=E x 3% Agency Calculated ACA $ 6,255.99
G Allowable ACA:

Greater of $250,000 per fiscal year $ 250,000
or
3% of Adjusted RPTTF Distribution (F) $ 6,256
or
The annual ACA shall not exceed 50% of the
Adjusted RPTTF distribution (E x 50%) $ 104,267
Administrative Cost Allowance (ACA) for ROPS 25-26
Since the Administrative Cost Allowance cannot exceed 50% of the total RPTTF distributed to pay enforceable obligations in the preceding fiscal year, reduced by administrative costs paid for by RPTTF, the SA’s maximum allowable Administrative Cost Allowance is $104,267.

COUNCIL ACTION:
______________________________________________________________________ ______________________________________________________________________ AGENDA ITEM # A.4.

STAFF REPORT

CITY OF SOLANA BEACH
TO: Honorable Mayor and City Councilmembers
FROM: Alyssa Muto, City Manager
MEETING DATE: January 15, 2025
ORIGINATING DEPT: Engineering Department, Dan Goldberg
SUBJECT: City Council Consideration of Resolution 2025-002 Authorizing the City Clerk to File a Notice of Completion for the La Colonia Tot Lot Replacement Project
BACKGROUND:

The construction contract for the La Colonia Tot Lot Replacement, Bid No. 2023-08, was awarded to Western Rim Constructors, Inc. on September 27, 2023. Construction of the project started in November 2023 and was completed in May 2024. At the end of construction, a 90-day plant establishment period started. Now that the plant establishment period is completed, the Notice of Completion (NOC) can be filed.

This item is before the City Council for consideration of Resolution 2025-002 (Attachment 1) to report the final project costs, accept the La Colonia Tot Lot Replacement as complete and direct the City Clerk to file a NOC.

DISCUSSION:

Western Rim Constructors, Inc. completed all work on this project in accordance with the approved plans and specifications of Bid No. 2023-08 to the satisfaction of the City Engineer. The City will release the 5% retention, in the amount of $60,525.35, 35 days after the NOC is approved by the City Council.

Two change orders were approved and executed during construction of the project.

Change Order No. 1, in the amount of $12,897.00, compensated the contractor for furnishment and installation of two concrete benches. Change Order No. 2, in the amount of $73,056.00, compensated the contractor for a number of associated repairs within La Colonia Park. This included repairing and resurfacing of the La Colonia Basketball Court, removal and replacement of irrigation pressure reducing equipment for the recycled water system, purchase and installation of two umbrellas, replacement of wood mulch with January 15, 2025
La Colonia Tot Lot NOC

Page 2 of 3 ends

rubber mulch, constructing a 6-inch concrete mow curb, and relocation of two backflow prevention devices. All of these associated improvements, as well as the Tot Lot and the vegetation establishment (90-day period) for the new landscaping of the Tot Lot, are complete.

CEQA COMPLIANCE STATEMENT:

The project is exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15302 of the State CEQA Guidelines. A Notice of Exemption was filed with the San Diego County Clerk on December 1, 2022.

FISCAL IMPACT:

A construction contract was awarded to Western Rim Constructors, Inc. at the September 27, 2023, City Council meeting in the amount of $1,124,554. An additional $95,056 was approved for a construction contingency to cover unforeseen items during construction and associated park improvements. There were two change orders approved and executed in the amount of $85,953.00, which equates to an effective contingency of approximately 7.6%.

Due to the complexities of the project construction, there is a need to increase the construction support agreement with Van Dyke Landscape Architects (VDLA) by $6,000.

This increase is included below in Table 1. Since there are sufficient funds remaining in the construction contingency to cover this additional expense, no additional appropriation is needed.

Table 1 – Construction Cost Accounting
Item Description Company Cost
Construction Contract Western Rim Constructors, Inc. $1,124,554.00 Change Order No. 1 Western Rim Constructors, Inc. $12,897.00 Change Order No. 2 Western Rim Constructors, Inc. $73,056.00 City Purchase of Playground Equipment GameTime $166,585.29 Construction Support VDLA $14,187.68
Total Project Costs $1,391,279.97
Appropriated Funds $1,406,610.00
Remaining Appropriated Funds $15,330.03
WORK PLAN:

The La Colonia Tot Lot Replacement is consistent with Item B.2 (La Colonia Park Improvements) of the Community Character Priorities section of the Fiscal Year (FY) 2023/24 Work Plan. Since the project was awarded and constructed in FY 2023/24, it was not listed in the FY 2024/25 Work Plan.

January 15, 2025
La Colonia Tot Lot NOC

Page 3 of 3 ends

OPTIONS:
• Adopt Staff recommendation.
• Deny Staff recommendation and provide direction.

CITY STAFF RECOMMENDATION:

Staff recommends that the City Council adopt Resolution 2025-002:

1. Authorizing the City Council to accept, as complete, the La Colonia Tot Lot Replacement, Bid No. 2023-08, constructed by Western Rim Constructors, Inc.

2. Authorizing the City Clerk to file a Notice of Completion.

3. Authorizing the City Manager to execute Amendment No. 5 to the Professional Services Agreement with Van Dyke Landscape Architects for the La Colonia Tot Lot Project.
_________________________
Ayssa Muto, City Manager
Attachments:

1. Resolution 2025-002
RESOLUTION 2025-002

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

SOLANA BEACH, CALIFORNIA, ACCEPTING AS

COMPLETE THE LA COLONIA TOT LOT REPLACEMENT

AND AUTHORIZING THE CITY CLERK TO FILE A NOTICE OF

COMPLETION
WHEREAS, a construction contract for the La Colonia Tot Lot Replacement, Bid No. 2023-08, was awarded to Western Rim Constructors, Inc. on September 27, 2023, and construction of the project started in November 2023; and WHEREAS, two changes orders were executed during construction. Change Order No. 1 compensated the contractor for furnishment and installation of two concrete benches. Change Order No. 2 compensated the contractor for associated La Colonia Park improvement including repairs and resurfacing of the La Colonia Basketball Court, removal and replacement of irrigation pressure equipment for the recycled water system, purchasing and installation of two umbrellas, replacement of wood mulch with rubber mulch, construction of a 6-inch concrete mow curb, and relocating two backflow prevention devices.

NOW, THEREFORE, the City Council of the City of Solana Beach, California, does resolve as follows:

1. That the above recitations are true and correct.

2. That the City Council accepts as complete the La Colonia Tot Lot Replacement, Bid No. 2023-08, constructed by Western Rim Constructors, Inc.

3. That the City Council authorizes the City Clerk to file a Notice of Completion for the project.

Resolution 2025-002
La Colonia Tot Lot NOC

Page 2 of 2 ends

4. That the City Council authorizes the City Manager to execute Amendment No. 5 to the Professional Services Agreement with Van Dyke Landscape Architects for the La Colonia Tot Lot Project.

PASSED AND ADOPTED this 15th day of January 2025, at a regular meeting of the City Council of the City of Solana Beach, California by the following vote:

AYES: Councilmembers –
NOES: Councilmembers –
ABSTAIN: Councilmembers –
ABSENT: Councilmembers –
______________________________
LESA HEEBNER, Mayor
APPROVED AS TO FORM: ATTEST:
_____________________________ _______________________________ JOHANNA N. CANLAS, City Attorney ANGELA IVEY, City Clerk COUNCIL ACTION:
______________________________________________________________________ ______________________________________________________________________ AGENDA ITEM # A.5.

STAFF REPORT

CITY OF SOLANA BEACH
TO: Honorable Mayor and City Councilmembers
FROM: Alyssa Muto, City Manager
MEETING DATE: January 15, 2025
ORIGINATING DEPT: City Manager’s Department
SUBJECT: Climate Action Commission Name Change
BACKGROUND:

On May 27, 2015, the City Council directed Staff to establish a Climate Action Commission (Commission) to focus on specific issues surrounding the development of a Climate Action Plan (CAP) including updating the City's Greenhouse Gas (GHG) Emissions Inventory, setting reduction targets, implementing mitigation measures and performing periodic monitoring, verification and evaluations.

At the October 14, 2015 City Council meeting, Staff presented a recommendation that the new Commission be comprised of nine (9) members - two (2) Councilmembers, five (5) residents and two (2) non-resident members of the environmental and/or scientific community. Staff also recommended that the Commission would be advisory to the full City Council and that it must follow the regulations of the Brown Act. Staff recommended that the Commission meet on a monthly basis. City Council established the Climate Action Commission on November 4, 2015.

Since 2015, the Climate Action Commission played a pivotal role in the City adopting its first Climate Action Plan in 2017, and adopting the 2024 Climate Action Plan Update.

Additionally, the Climate Action Commission has engaged in public outreach and education to help implement the City’s ban on single-use plastic bags, food-related polystyrene initiatives, exploring the feasibility of creating a Community Choice Aggregation program, and more. The Climate Action Commission also took the lead on creating an Adaptation Chapter to the City’s Climate Action Plan.

Since the Council recently approved the 2024 Climate Action Plan Update, it makes sense to consider changing the name of the Commission to more adequately describe the role of the Commission, as it shifts its focus to implementation of the CAP Update mitigation measures and associated concentration on adaptation and resiliency. This item is before the Council to consider changing the name of the Climate Action Name Change to Climate & Resiliency Commission

Page 2 of 3 ends

Commission to the Climate & Resiliency Commission. The regular meetings of the Climate & Resiliency Commission shall be held as may be necessary and appropriate on a day and at an hour specified by resolution of the Commission, and the Commission may conduct special meetings at a time and location as may be necessary and appropriate, upon the approval of the chairperson or a majority of its members, in accordance with California open meeting laws. Based on input from the CAC at their December 2024 meeting, City Staff is recommending that the Commission meet on a bimonthly (every other month) basis moving forward.

DISCUSSION:

The 2024 Climate Action Plan Update incorporated equity throughout the plan, as well as adaptation and resiliency. Given this new focus, a Commission name that reflects the new additions felt appropriate. Staff presented the Commission with several name options at the December 18, 2024 meeting. Members unanimously voted to change the name to the Climate & Resiliency Commission, as the best representation of the climate action and resiliency work the Commission is committed to implementing.

CEQA COMPLIANCE STATEMENT: N/A
FISCAL IMPACT:

There are no additional fiscal impacts due to this change. This Commission will continue to comply with required LiveScan background checks paid for by Human Resources.

The work products developed by the Commission may have individual costs but those will be brought to Council for approval and authorization on a case-by-case basis. There may be costs incurred for training the Commission; however, those would generally be consistent with the training implemented for the existing CAC.

WORKPLAN:

The proposed Commission will be working on items associated with the Environmental Sustainability - Policy Development “Community-Wide Greenhouse Gas (GHG) Emission Reductions” Priority Item.

OPTIONS:

In considering this matter, the City Council has the following options:
• Approve Staff’s recommendation.
• Approve Staff’s recommendation with modifications.
• Do not approve Staff’s recommendation.

Name Change to Climate & Resiliency Commission

Page 3 of 3 ends

CITY STAFF RECOMMENDATION:

Staff recommends that the City Council:

1. Adopt Resolution 2025-003 to change the name of the Climate Action Commission to Climate & Resiliency Commission.
_____________________________
Alyssa Muto, City Manager,
Attachments:

1. Resolution 2025-003
RESOLUTION 2025-003

A RESOLUTION OF THE CITY COUNCIL OF THE CITY

OF SOLANA BEACH, CALIFORNIA, RENAMING THE

SOLANA BEACH CLIMATE ACTION COMMISSION TO

THE CLIMATE & RESILIENCY COMMISSION
WHEREAS, California is at the forefront of Greenhouse Gas (GHG) emission reduction laws, starting with the landmark passing of Assembly Bill 32 (“AB 32”) the California Global Warming Solutions Act of 2006, that established a GHG reduction target of 1990 levels by 2020. Building from that, Governor Brown issued Executive Order B-30-15 that established the most aggressive benchmark enacted by any government in North America to reduce GHG emissions 40% below 1990 levels by 2030. Many cities adopted Climate Action Plans to set targets in alignment with California law and implement quantifiable measures to meet those targets; and WHEREAS, on May 27, 2015, the City Council directed Staff to establish a Climate Action Commission to focus on specific issues surrounding the development of a Climate Action Plan including updating the City's Greenhouse Gas Emissions Inventory, setting reduction targets, implementing mitigation measures and performing periodic monitoring, verification and evaluations; and
WHEREAS, the City Council directed that the Commission be comprised of a cross-section of community members representing all sectors and would require constant and detailed training to comprehend the complex issues surrounding the CAP implementation; and
WHEREAS, on October 14, 2015, the City Council directed that all residents and professionals on the Commission be voting members and that the applications to be on the commission require the submission of a C.V. or resume and the support of at least one other resident of the City in addition to the City’s usual requirements for a commission appointment application; and
WHEREAS, since 2015, the Climate Action Commission played a pivotal role in the City adopting its first Climate Action Plan in 2017 and adopting the 2024 Climate Action Plan Update. Additionally, the Climate Action Commission has engaged in public outreach and education to help implement the City’s ban on single-use plastic bags, food-related polystyrene initiatives, exploring the feasibility of creating a Community Choice Aggregation program, and more. The Climate Action Commission also took the lead on creating an Adaptation Chapter to the City’s Climate Action Plan; and WHEREAS, since the Council recently approved the 2024 Climate Action Plan Update, it makes sense to consider changing the name of the Commission to more adequately describe the role of the Commission, as it shifts its focus on implementation of the CAP Update mitigation measures and associated concentration on adaptation and resiliency.

Resolution 2025-003
Climate Action Commission

Page 2 of 3 ends

NOW THEREFORE, the City Council of the City of Solana Beach, California, does resolve as follows:

1. That the foregoing recitations are true and correct.

2. The “Solana Beach Climate Action Commission” (the “Climate Action Commission,” or the “Commission”) was established on November 4, 2015 to serve as an advisory legislative body subordinate to the City Council, established under the authority, and subject to, Chapter 2.60 of the Solana Beach Municipal Code.

3. The name of this Commission will change from Climate Action to Climate & Resiliency to reflect both the climate action work and the resiliency work Commissioners are engaged with.

4. Members of the Climate & Resiliency Commission shall continue to be appointed by the City Council at large. The term of office shall be two years. Members may be appointed to successive terms. Members of the public that apply for an open position on the Commission must submit “curriculum vitae” (CV) or resume with the application. In addition, each resident who applies for a position on the Commission must have a letter of endorsement from another resident of the City of Solana Beach.

5. Membership shall continue to be comprised of nine (9) members as follows:

A. Five (5) members shall be residents of the City of Solana Beach.

B. Professionals: Two (2) members shall be from the environmental and/or scientific community and the residency requirement of Chapter

2.60 does not apply to these two members.

C. Councilmembers: Two (2) Councilmembers will be appointed to the Commission.

D. Advisory: Additional advisory members may be appointed to the Commission by the City Council, including residents and nonresidents, with specific professional or scientific expertise. These members would not have voting privileges but could be key advisors to the Commission by bringing their expertise, knowledge and experience to the process.

6. Duties of the Commission shall include the development and implementation of a Climate Action Plan, including updating the City's Greenhouse Gas Emissions Inventory, setting reduction targets, implementing mitigation measures and performing periodic monitoring, Resolution 2025-003
Climate Action Commission

Page 3 of 3 ends

verification and evaluations.

7. The Climate & Resiliency Commission shall conduct its meetings as follows:

A. The regular meetings of the Climate & Resiliency Commission shall be held as may be necessary and appropriate on a day and at an hour specified by resolution of the Commission. All meetings of the Commission shall be conducted in accordance with California open meeting laws.

B. The Commission may conduct special meetings at a time and location as may be necessary and appropriate, upon the approval of the chairperson or a majority of its members, in accordance with California open meeting laws.

C. A majority of the members shall constitute a quorum of the Commission for the transaction of business.

8. All Commission recommendations and reports shall be in writing, signed by the chairperson of the Commission, and delivered to City Council and City Manager.

9. Nothing in this Resolution shall be construed as restricting or curtailing any of the powers of the City Council, or as a delegation to the Climate & Resiliency Commission of any of the authority or discretionary powers vested and imposed by law in the City Council. The City Council declares that the public interest, convenience and welfare require the appointment of a Climate & Resiliency Commission to act in a purely advisory capacity to the City Council for the purposes herein enumerated. Any power herein delegated to the Commission to adopt rules and regulations shall not be construed as a delegation of legislative authority but purely a delegation of administrative authority.

PASSED AND ADOPTED at a regular meeting of the City Council of the City of Solana Beach, California, held on the 15th day of January 2025, by the following vote:

AYES: Councilmembers –
NOES: Councilmembers –
ABSENT: Councilmembers –
ABSTAIN: Councilmembers –
______________________
LESA HEEBNER, Mayor
APPROVED AS TO FORM: ATTEST:
_________________________________ _________________________ JOHANNA N. CANLAS, City Attorney ANGELA IVEY, City Clerk COUNCIL ACTION:
______________________________________________________________________ ______________________________________________________________________ AGENDA ITEM # B.1.

STAFF REPORT

CITY OF SOLANA BEACH
TO: Honorable Mayor and City Councilmembers
FROM: Alyssa Muto, City Manager
MEETING DATE: January 15, 2025
ORIGINATING DEPT: Finance – Rachel Jacobs, Finance Director SUBJECT: Council Consideration Fee Study and Cost Allocation Plan Updates & Resolution 2025-001 Updating the City’s Fee
Schedule
BACKGROUND:

A Comprehensive Fee Study and Cost Allocation Plan (CAP) project was initiated by the City of Solana Beach (City) in January 2024. A Request for Proposals (RFP) was issued, two consultant proposals were received, and, in March 2024, a professional services agreement was executed with Willdan Financial Services, to update the City’s current fee schedule and CAP.

This project proceeded in two phases. The first phase was to prepare an updated CAP, which distributes general government and support services across the direct services provided to the public. This phase was completed in July 2024. The second phase was an analysis of the City’s user fees and charges to accurately represent the efforts entailed in providing each of the City’s services and programs. This phase was completed in October 2024.

The last comprehensive fee study was undertaken in 2017, and new fees have been added as needed, but in general, the City’s user fees, development review and permit fees, and regulatory fees have remained unchanged since the last fee study.

This item is before Council to consider adoption of Resolution 2025-001 (Attachment 1) approving the update of the City’s Schedule of Fees, effective March 17, 2025.

DISCUSSION:

User fees and charges are collected to recover some or all costs incurred in providing a January 15, 2025
Fee Study and Cost Allocation Plan

Page 2 of 4 ends

specific service from which one or more individuals (i.e. permit applicants) obtain a benefit. It is a best practice for cities to perform a comprehensive update of their cost allocation plans every 5 years and review user fees and charges schedules annually.

One of the Council’s overarching Work Plan goals is to enhance the City’s long-term fiscal sustainability. Adopting a fee methodology and resulting fee adjustments realigns user fees to more efficiently utilize general revenues (taxes) for services and programs such as public safety, infrastructure maintenance, and economic development.

Furthermore, the California Constitution (Propositions 13, 218 and 26) and various state laws have placed both substantive and procedural limits on cities’ ability to impose fees and charges. Proposition 26 contains a more general articulation of the cost of service principle and includes a requirement that the local government bear the burden of proof that 1) “a levy, charge, or other exaction is not a tax; 2) that the amount is no more than necessary to recover the reasonable costs of the government activity; and 3) that the manner in which those costs are allocated to a payor bear a fair or reasonable relationship to the payor’s burden on, or benefits received from, the governmental activity.” (Cal.

Const. art. XIII C, § (e).). It is important to note that rental charges for rooms or facilities, fines, penalties and late charges are not technically user fees and are not required to be based on actual costs. Instead, these types of charges are more typically governed by market rates, reasonableness and other policy driven factors and can legally exceed the cost.

In January 2024, the City released a RFP solicitation for an independent consultant with expertise in municipal finance to update the City’s cost allocation plan and conduct a review of its user fee schedule. Two proposals were received and, after an evaluation process, Willdan Financial Services received the highest rated score and was selected to provide the requested services. Willdan Financial Services was established in 1988 and has worked with more than 800 public agencies including performing over 100 user fee studies, Office of Management & Budget (OMB) compliant and cost allocations plans in the past five years.

The City-wide CAP and User Fee Analysis project was initiated in March 2024, was a coordinated effort among all City departments and included numerous meetings between Willdan Financial Services and City Staff to review updates and provide feedback. The Fee Study Update (Fee Study) was completed at the end of November 2024 and is included as Attachment 2.

The Willdan Financial Services Fee Study was based on Fiscal Year (FY) 2023/24 budget data and computed estimated annual fee revenue based on FY 2023/24 projected units of service activity level. The methodology used to determine the recommended fees and the CAP is explained in the Executive Summary section of the Fee Study Update report.

The following chart summarizes the various cost recovery levels for fees and General Fund subsidies related to Development Services, such as Planning, Engineering, and Building; Public Safety Services, such as Fire Inspections; Recreation programs; I I
January 15, 2025
Fee Study and Cost Allocation Plan

Page 3 of 4 ends

Business Registration; and Administrative fees.

Overall, Willdan Financial Services’ analysis indicates that the City can recover an additional $628,904 in cost recovery with the recommended fee changes. As expected, cost recovery levels varied between departments and programs. These fees are based on interviews with City department Staff. Staff from the various departments completed worksheets to fully allocate the Staff time necessary to complete an average project/permit. Willdan calculated the City’s budgeted costs for salary and benefits, maintenance and operations, and general and department overhead into a fully allocated hourly rate for each position in the City. The fully allocated hourly rate is then applied to the average time spent by each employee classification providing the service for each of the permits reviewed.

Appendix C of Attachment 2 titled “Cost Recovery Analysis” provides detailed tables with the results of fee study including the current fees (2024), full cost of recovery, subsidy rate (5) based on suggested fee, staff suggested fee, fee change ($) and fee change (%).

As a result of this work some new fees categories are proposed based on the discussions with City Staff on the permit processing or variations in project scope that may occur.

The Fee Study and proposed fees are being presented to the Budget and Finance Commission for their review and input at their January 13, 2025, meeting. The Commission has been asked to prepare a memorandum with their feedback (to be included as Attachment 3) for Council consideration.

Similar to what was proposed when the last comprehensive fee study was completed in 2018 and adopted in 2019, Staff is recommending that the schedule of fees be adjusted annually effective January 1st of each fiscal year based on the San Diego-Carlsbad CPI, All Items, for All Urban Consumers (CPI-U) Index, not to exceed 2.5% annually, for the prior calendar year period June through May.

FY 24/25 Projected
Budgeted Projected Revenue
Department Revenue Revenue Change
Administration $10,200 $50,200 $40,0CO
Perm·t Regulation Seirvices $301,050 $413,242 $112,192
Community Development $247,500 $4ffi,075 $157,575
Building $560,000 $781,7ffi $221,765
Engi nee ri ng $365,000 $389,157 $24,157
Public Saif ety $288,000 $36:ll,077 $73,077
Communi Sel'\lices $71875 $12 012 $137
Total $1,843,625 $2,472,5291 $62&904
January 15, 2025
Fee Study and Cost Allocation Plan

Page 4 of 4 ends

CEQA COMPLIANCE STATEMENT:

Not a project as defined by CEQA.

FISCAL IMPACT:

Based on the Fee Study Update report prepared by Willdan Financial Services, if all recommendations were to be approved by Council, an additional $628,904 in possible new revenue could be realized.

WORK PLAN:

Fiscal Sustainability
OPTIONS:
• Adopt the proposed fee resolution recommendations as presented in Resolution 2025-001.
• Provide direction to modify the fee resolution.
• Deny the fee resolution.
• Request additional information.
• Take no action at this time.

CITY STAFF RECOMMENDATION:

Staff recommends that the City Council:

1. Conduct the Public Hearing
a. Open the Public Hearing
b. Report Council Disclosures
c. Receive Public Testimony
d. Close the Public Hearing

2. Consider the adoption of Resolution 2025-001 updating the 2025 Fee Schedule. _________________________
Alyssa Muto, City Manager
Attachments:

1. Resolution 2025-001

2. User Fee Study Report

3. Budget and Finance Commission Memorandum
RESOLUTION 2025-001

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

SOLANA BEACH, CALIFORNIA, AMENDING THE
SCHEDULE OF FEES EFFECTIVE MARCH 17, 2025
WHEREAS, the City of Solana Beach has conducted an extensive and exhaustive analysis of its services, the costs reasonably borne of providing those services, the beneficiaries of those services, and the revenues produced by those paying fees and charges for special services; and the City desires to provide a review process for landscape plans and site inspections for landscaping of development projects; and
WHEREAS, it is the intention of the City Council to conduct such analysis at least every five years to ensure fees are set appropriately to recover costs reasonably borne for providing services; and
WHEREAS, the City established a policy for recovering the full costs reasonably borne for providing special services of a voluntary and limited nature, such that general taxes are not diverted from general services of a broad nature and thereby utilized to subsidize unfairly and inequitably such special services; and WHEREAS, pursuant to Government Code Section 66016 the specific fees to be charged for services must be adopted by the City Council by Resolution, after providing notice and holding a public hearing; and
WHEREAS, notice of public hearing has been provided per California Government Code Section 6062, oral and written presentations made and received, and the required public hearing held; and
WHEREAS, a schedule of fees and charges to be paid by those requesting such special services need be adopted so that the City might carry into effect its policies; and WHEREAS, it is the intention of the City Council to update the schedule of fees annually effective January 1 of each calendar year based on the San Diego-Carlsbad CPI, All Items, for All Urban Consumers (CPI-U) Index, not to exceed 2.5% annually, for the prior twelve month period June through May; and
WHEREAS, the City Council recognizes that special circumstances may support the waiving of fees depending upon the nature of the situation; and WHEREAS, pursuant to California Government Code Section 6062, a general explanation of the hereinafter contained schedule of fees and charges has been published as required; and
Resolution 2025-001
Schedule of Fees Update

Page 2 of 4 ends

WHEREAS, all requirements of California Government Code Section 66016 are hereby found to have been complied with.

NOW, THEREFORE, the City Council of the City of Solana Beach, California, does resolve as follows:

1. That the above recitations are true and correct.

2. Fee Schedule Adoption: The schedule of fees and charges (Appendix A) are hereby directed to be computed by and applied by the various City departments, and to be collected by the City Finance Department for the herein listed special services when provided by the City or its designated contractors.

3. Separate Fee for Each Process: All fees set forth by this resolution are for each identified process; additional fees shall be required for each additional process or service that is requested or required.

Where fees are indicated on a per unit of measurement basis the fee is for each identified unit or portion thereof within the indicated ranges of such units.

4. Added Fees and Refunds: Where additional fees need to be charged and collected for completed staff work, or where a refund of excess deposited monies is due, and where such charge or refund is ten dollars ($10.00) or less, a charge or refund need not be made, pursuant to California Government Code Section 29375.1 and amendments thereto.

5. Listing of Fees and Phase In: The attached list of fees shall be charged and collected for the enumerated services as scheduled.

6. Interpretations: This Resolution may be interpreted by the several City department heads in consultation with the City Manager and, should there be a conflict between two fees then the lower in dollar amount of the two shall be applied.

7. Adjustments to Fees: It is the intention of the City Council to conduct an extensive analysis of its services periodically and review the fees and charges as determined and set out herein based on the City’s Annual Budget and all the City’s costs reasonably borne as established at that time and, if warranted, to revise such fees. Inflation adjustments made between such periodic review shall be done annually effective January 1 of each calendar year via a new fee resolution and shall be Resolution 2025-001
Schedule of Fees Update

Page 3 of 4 ends

based on the San Diego-Carlsbad CPI, All Items, for All Urban Consumers (CPI-U) Index, not to exceed 2.5% annually, for the prior twelve month period June through May.

8. Adjustment to Impact Fees effective March 17, 2025: The Impact Fees were not included as part of this User Fee Study, these fees were adjusted as follows:

The Los Angeles Construction Cost Index for the twelve-month period October 2023 through October 2024 is 0.87%, therefore the adjustment to the Transportation Impact Fees effective March 17, 2025 will be an adjustment of 0.87%.

The San Diego-Carlsbad CPI, All Items, for All Urban Consumers (CPI-U) Index, for the twelve-month period June 2022 through May 2023 is

3.2%, therefore, the adjustment to the Fire Mitigation Impact Fee, Park Development Impact Fee, and Public Use Facilities Impact Fees effective March 17, 2025, will be an adjustment of 2.5%.

9. Rounding of Fees: The following rounding factor has been applied to the adjustment of fees so that the adjusted fees are in whole dollars:
a. Any fee in the amount of $0.01 to $0.99 round up to $1.00. b. Any fee more than $1.00 with cents totaling from $0.01 to $0.49 round down to the nearest whole dollar.
c. Any fee more than $1.00 with cents totaling from $0.50 to $0.99 round up to the nearest whole dollar.

10.Waiver of Fees: The City Manager shall have the authority to waive fees for non-profit organizations located within the City and for City sponsored events. All other fee waiver requests shall be reviewed by the City Council.

11.Constitutionality: If any portion of this Resolution is declared invalid or unconstitutional then it is the intention of the City Council to have passed the entire Resolution and all its component parts, and all other sections of this Resolution shall remain in full force and effect.

PASSED AND ADOPTED this 15th day of January 2025, at a regularly scheduled meeting of the City Council of the City of Solana Beach, California by the following vote:

AYES: Councilmembers –
NOES: Councilmembers –
Resolution 2025-001
Schedule of Fees Update

Page 4 of 4 ends

ABSENT: Councilmembers –
ABSTAIN: Councilmembers –
______________________________
LESA HEEBNER, Mayor
APPROVED AS TO FORM: ATTEST:
________________________________ _______________________________ JOHANNA N. CANLAS, City Attorney ANGELA IVEY, City Clerk I I

CITY OF SOLANA BEACH
Schedule of Fees
Effective March 17, 2025
Service Description of Fee for Service
Code # Dept Service Effective 03/17/25 Fee Instructions/Notes S-001 All CUPs: $12,486
S-001A
Bluff Retention Device CUPs & Wireless
Communication Facility CUPs
Require addtl deposit for various third-party
reviews at Cost + 15%
(see Service Code S-350)
S-002 Community Dev Conditional Use Permit - Revise/Modify $4,341 Per application S-003 Community Dev Conditional Use Permit - Time
Extension $3,215 Per application
S-004 $3,293 Per application (Other)
S-004A $3,042 Per application (Wireless)
S-004B
S-005 Community Dev Community Development Dir. Use
Permit - Revision $1,710 Per application
S-006 Community Dev Community Development Dir. Use
Permit - Time Extension $1,459 Per application
S-008 Community Dev Minor Exception - Review Process $1,432 Per application S-011 Community Dev Temporary Use Permit - Processing $1,895 Per application S-012 Community Dev Temporary Use Permit - Time
Extension $947 Per application
S-013 Community Dev Zoning Letter $225 Per letter
S-014 Community Dev Variance - Processing $9,333 Per application S-016 Community Dev Pre-application review $3,787 Per application. 50% of the fee to be credited against future fees if the project actually goes forward.

Resident: $2,182
Others: $5,455
S-018 Community Dev General Plan Amendment
S-019 Community Dev Rezoning Review/Specific Plan
S-020 Community Dev Zoning Text Amendment
Residential A - Single Family Resident $7,309
Residential B - Single Family Non-Resident
$14,618
Residential C - 2-4 Units $21,522
Residential D - >4 Units $24,288
Non-Residential/Mixed Use A - Exterior
Improvements/Remodel $19,020
Non-Residential/Mixed Use B - Additions <500 sqft
$24,232
Non-Residential/Mixed Use C - Additions >500
sqft/New Commercial $28,125
S-021A
or a deposit determined by staff with charges at
the fully allocated hourly rates for all personnel
involved plus any outside costs as determined by
Service Code S-350
S-022 Community Dev Development Review Permit -
Modification $4,511 Per application
S-022A Community Dev Administrative Development
Review Permit Modification $3,153
S-023 Community Dev Development Review Permit - Time
Extension $3,007 Per application
S-024 Community Dev Major Subdivision - Tentative Map $19,942 Per application S-025 Community Dev Major Subdivision - Final Map $6,477 Per application S-026 Community Dev Major Subdivision - Amend. Of
Condition $5,750 Per application
S-027 Community Dev Major Subdivision - Time Extension $5,279 Per application S-028 Community Dev Minor Subdivision - Tentative Map $15,290 Per application S-029 Community Dev Minor Subdivision - Parcel Map $5,393 Per application S-030 Community Dev Minor Subdivision - Amend. Of Condition $4,502 Per application S-031 Community Dev Minor Subdivision - Time Extension $4,354 Per application Deposit for third-party review at Cost
+ 15% Admin Fee (see Service Code S-350)
Deposit for third-party review at Cost
+ 15% Admin Fee (see Service Code S-350)
Per application. Bluff retention device CUPs will include deposit based on estimated costs for third-party geotechnical review, consultant review, and legal services. Optional: expediting fee and CEQA document preparation fee, upon request.

Community Dev Conditional Use Permit - Processing
Wireless Communications Facility-requires additional deposit for third party reviews plus 15% (see Service Code S- $10,000 deposit or a deposit determined by staff with charges at the fully allocated hourly rates for all personnel Community Development Directors Use
Permit Community Dev
$10,000 deposit or a deposit determined by staff with charges at the fully allocated hourly rates for all personnel

COMMUNITY DEVELOPMENT SERVICES
$10,000 deposit or a deposit determined by staff with charges at the fully allocated hourly rates for all personnel Community Dev Environmental Impact Report
Environmental Documentation
Community Dev
Community Dev Appeal to the City Council Per appeal
Community Dev
Per application
S-032 Per application
Per application
S-017
S-021
Development Review Permit -
Processing
S-035
1 CITY OF SOLANA BEACH
Schedule of Fees
Effective March 17, 2025
Service Description of Fee for Service
Code # Dept Service Effective 03/17/25 Fee Instructions/Notes S-036 Community Dev Structure Develop. Permit - Processing $5,109 Per application S-036A Community Dev Structure Develop. Permit - Processing (with S-021)
S-036D Community Dev Structure Develop. Permit - Processing (with multiple entitlements) $3,368
If in conjunction with multiple entitlements, a discount of 15% is applied to the lower cost entitlements, and the S-036 will instead be $3,052 per application
S-037 Community Dev Structure Develop. Permit Waiver/Time Extension $666
S-037A Community Dev Structure Develop. Permit Waiver/Time Extension (with S-023) $0
Community Dev View Assessment - Claimant TBD by Council, Currently $600 Community Dev View Assessment - Applicant TBD by Council, Currently $600 S-041 Community Dev View Assessment Committee (VAC) -
Appeal to City Council $2,410 Per application
S-042 Community Dev
View Assessment - Community
Development Director Appeal to City
Council
This fee would be charged as an Appeal to the
City Council (S-017) and not as a separate fee. Per application S-050 Community Dev Standard Sign Permit - Processing $376 Per application S-051 $1,106
S-051A plus 100% fine of original sign permit if the sign was built without a permit.

S-052 Community Dev Comprehensive Sign Plan - Amendment $604 Per application S-053 Community Dev Temporary Sign/Banner $125 Per application Deposit for third-party review at Cost
+ 15% Admin Fee (see Service Code S-350)
S-065 Community Dev Street Address Change $331 Per application S-067 Community Dev Planning Public Noticing $1,110 Per notice Community Dev Multi-permit discount of 15%
Community Dev
Per application
Full refund of application fee will be made if parties settle 2 If in conjunction with a Development Review Permit (S-021), the S-036 fee will instead be 30% of the total S-036 fee
Per application. This fee will not be charged in conjunction with a Development Review Permit-Time Extension (S-023)
Community Dev
S-040
A multi-permit discount of 15% is available for each additional Planning Department permit service filed on the same S-060 Landscape Plan Review/Inspection
Per application Comprehensive Sign Plan - Review
Process
Per application
2 CITY OF SOLANA BEACH
Schedule of Fees
Effective March 17, 2025
Service Description of Fee for Service
Code # Dept Service Effective 03/17/25 Fee Instructions/Notes S-100 $2,211
S-100A
or a deposit determined by staff with charges at
the fully allocated hourly rates for all personnel
involved plus any outside costs as determined by
S-350.

Construction Valuation * * Per Resolution 2001-85, the most current City of San Diego Cost Estimate Unit Price List is used for determining valuation $0-$40,000: $1,462
$40,001-$100,000: $2,538
$100,001-$200,000: $3,909
$200,001+: $6,232
S-110A
or a deposit determined by staff with charges at
the fully allocated hourly rate for all personnel
involved plus any outside costs as determined by
S-350.

S-110B
Bluff Projects - Deposit determined by staff with
charges at the fully allocated hourly rate for all
personnel involved plus any outside costs as
determined by S-350.

Construction Valuation * * Per Resolution 2001-85, the most current City of San Diego Cost Estimate Unit Price List is used for determining valuation $0-$40,000: $1,462
$40,001-$100,000: $2,538
$100,001-$200,000: $3,909
$200,001+: $6,232
S-111A
or a deposit determined by staff with charges at
the fully allocated hourly rate for all personnel
involved plus any outside costs as determined by
S-350.

S-111B
Bluff Projects - Deposit determined by staff with
charges at the fully allocated hourly rate for all
personnel involved plus any outside costs as
determined by S-350.

S-112 Engineering Grading Deposits
Based on an Engineer’s Estimate of the work
performed under the permit. Per Resolution 2001-
85, the City of San Diego Cost Estimate Unit Price
List is used for determining security amount
Per permit/inspection
Construction Valuation * * Per Resolution 2001-85, the most current City of San Diego Cost Estimate Unit Price List is used for determining valuation $0-$40,000: $1,462
$40,001-$100,000: $2,538
$100,001-$200,000: $3,909
$200,001+: $6,232
S-115A
or a deposit determined by staff with charges at
the fully allocated hourly rate for all personnel
involved plus any outside costs as determined by
S-350.

S-115B
Bluff Projects - Deposit determined by staff with
charges at the fully allocated hourly rate for all
personnel involved plus any outside costs as
determined by S-350.

Per plan check
Per permit/inspection
Per permit/inspection
Engineering
Engineering Grading Plan Check
Engineering

ENGINEERING SERVICES
Per application
Grading Permit/Inspection
Lot Line Adj./Cert. Of Compliance. -
Review
Public Improvement Plan Check
S-110
S-111
S-115
Engineering
3 CITY OF SOLANA BEACH
Schedule of Fees
Effective March 17, 2025
Service Description of Fee for Service
Code # Dept Service Effective 03/17/25 Fee Instructions/Notes Construction Valuation * * Per Resolution 2001-85, the most current City of San Diego Cost Estimate Unit Price List is used for determining valuation $0-$40,000: $1,462
$40,001-$100,000: $2,538
$100,001-$200,000: $3,909
$200,001+: $6,232
S-116A
or a deposit determined by staff with charges at
the fully allocated hourly rate for all personnel
involved plus any outside costs as determined by
S-350.

S-116B
Bluff Projects - Deposit determined by staff with
charges at the fully allocated hourly rate for all
personnel involved plus any outside costs as
determined by S-350.

S-117 Engineering Public Improvement Deposits
Based on an Engineer’s Estimate of the work
performed under the permit. Per Resolution 2001-
85, the most current City of San Diego Cost
Estimate Unit Price List is used for determining
security amount
Per permit/inspection
Deposit for third-party review at Cost
+ 15% Admin Fee
Street Cut - $1,088
Standard - $766
S-116 Engineering Encroachment Permit Deposit
SBMC 11.20.230 - twice the estimated cost of
removing the encroachment, but in no case less
than $50.00
Per permit
S-120 Engineering Miscellaneous Engineering
Permit/Inspection $321 Per permit/inspection
S-125 $2,533
S-125A
or a deposit determined by staff with charges at
the fully allocated hourly rate for all personnel
involved plus any outside costs as determined by
S-350.

S-127 Engineering Easement/R.O.W Dedication $703 Per application S-130 Engineering Subdivision Monuments security deposit is based on estimate provided by surveyor to set the monuments. Per application
S-135 Future Capacity = 50%
S-135A Ocean Outfall = 27%
S-135B Existing Facility = 23%
S-140 Engineering Marine Safety Permit
Deposit collected for:

Ramp Fee - $6 per round trip
Trip Fee - $3 per ton
plus $31 per day for days 1-30 and $57 per day
for 31 and subsequent days
plus actual staffing costs (4 hour min)
Per Permit
*To be revised based on ramp CIP project in progress
Per permit/inspection
Engineering Easement Abandon/Street Vacation Per application Encroachment Permit Per permit
Engineering Geotechnical Plan Review/Inspection
Public Improvement Permit/ Inspection
Engineering
Engineering
S-120
Engineering
Sewer Connection Fees Per total of $4,500 per 1.0 EDU *Subject to change dependent on Sewer Rate Study Results in Spring
Per application
S-116
S-115
4 CITY OF SOLANA BEACH
Schedule of Fees
Effective March 17, 2025
Service Description of Fee for Service
Code # Dept Service Effective 03/17/25 Fee Instructions/Notes S-210 TO S265 Community Dev Building Plan - Plan Check & Permit/Inspection
See attached valuation tables
Attachments A & B Per application & permit/inspection
S-270 Community Dev CalGreen Building Plan Check 0-50,000 SF - 3% of Building Permit Plan Check Above 50,001 - 1% of Building Permit Plan Check Per plan check S-272 Community Dev CalGreen Building Permit/Inspection 0-50,000 SF - 3% of Building Inspection Fee Above 50,001 - 1% of Building Inspection Fee Per permit/inspection Based on the Project Valuation
$0 - $500,000: $373
Above $500,000: $523
Based on the Project Valuation
$0-$500,000: $373
Above $500,000: $523
S-278 001-4715 Single Family Single Family
Residential Solar Plan Check
$43 (25% of Individual Electrical Permit FeeAttachment B) Per plan check S-279 001-4320 Single Family Single Family
Residential Solar Permit/Inspection
$172 (Individual Electrical Permit Fee-Attachment
B) Per permit/inspection
S-280 Community Dev Building Permit Extension Review $102 Per application S-285 Community Dev Violation of Building Permit equal to total of building permit fee that was required (in addition to building permit fee) Per violation S-290 Community Dev SMIP Fee per Section 2705 of the Public Resources Code S-291 Community Dev State Building Standards Fee per HSC Section 18931.6

BUILDING SERVICES
Community Dev Commercial Photovoltaic Plan Check
Per permit/inspection
S-275
Community Dev
Per plan check
S-277 Commercial Photovoltaic
Permit/Inspection
5 CITY OF SOLANA BEACH
Schedule of Fees
Effective March 17, 2025
Service Description of Fee for Service
Code # Dept Service Effective 03/17/25 Fee Instructions/Notes Single family $3,800 per dwelling unit
Multi-family $3,041 per dwelling unit
S-310 Community Dev Public Facilities Fee 1% of project valuation S-315 Community Dev Master Art Policy Fee 0.5% of project valuation Per application; commercial projects with valuation of $500,000 or more with 5 or more dwelling units; deposit paid up front; reimbursement under MAP guidelines if public art is incorporated into the project
S-320 Community Dev Affordable Housing Impact Fee $27.90 per SF S-322 Engineering Transportation Impact Fee (TIF) See Attachment C S-330 Fire Fire Mitigation Impact Fee (FMIF) See Attachment C S-332 Community Dev Park Development Impact Fee (PDIF) See Attachment C S-334 Community Dev Public Use Facilities Impact Fee (PUFIF) See Attachment C S-350A Landscape Review
S-350B Wireless Review
S-350C Geotechnical Review
S-350D Biological Review
S-350E Special Counsel Review
S-350F Stormwater Review
S-350G. Traffic Review
S-350H Environmental Review
S-350I Shoreline Development Review
S-350J Noise Review
S-350K Cultural Resources Review
S-350L Bluff Retention
S-355 Various Third Party Review Admin Third Party Review Admin Fee 15% of Third Part Review Cost (S-350)

DEVELOPMENT IMPACT FEES & DEVELOPER PASS-THRU
Per application; fee set by SANDAG and adjusted annually, no less than 2% per year.

Various Third Party Review + 15% of Third Party Review Cost (S-355) S-305 Community Dev Regional Transportation Congestion
Program RTCIP Fee
6 CITY OF SOLANA BEACH
Schedule of Fees
Effective March 17, 2025
Service Description of Fee for Service
Code # Dept Service Effective 03/17/25 Fee Instructions/Notes S-410 Commercial:

Plan Check - $401 per plan
S-411 Permit/Inspection - $349 per inspection
S-412 Residential:

Plan Check - $209 per plan
S-413 Permit/Inspection - $209 per inspection
S-414 Reinspection (3rd Inspection) - $209 per
reinspection
S-420
Plan Check - Tenant Improvement:
0-2,500 Sq. Ft: $241
2,501-5,000 Sq. Ft: $321
5,001-25,000 Sq. Ft: $482
25,001-50,000 Sq. Ft: $642
>50,000 Sq. Ft., each add'l 1,000 sq.ft. $80.00
Per plan check
S-420 Plan Check - New: Actual Costs Per plan check
S-421
Permit/Inspection - Tenant Improvement:
0-2,500 Sq. Ft: $209
2,501-5,000 Sq. Ft: $279
5,001-25,000 Sq. Ft: $419
25,001-50,000 Sq. Ft: $558
>50,000 Sq. Ft., each add'l 1,000 sq.ft. $70.00
Per permit/inspection
S-421
Permit/Inspection - New:
0-2,500 Sq. Ft: $419
2,501-5,000 Sq. Ft: $488
5,001-25,000 Sq. Ft: $558
25,001-50,000 Sq. Ft: $698
>50,000 Sq. Ft., each add'l 1,000 sq.ft. $70.00
Per permit/inspection
S-422
Plan Check:
0-2,500 Sq. Ft: $241
2,501-5,000 Sq. Ft: $321
5,001-7,000 Sq. Ft: $401
7,001+ Sq. Ft: $562
Per plan check
S-423
Permit/Inspection:
0-2,500 Sq. Ft: $279
2,501-5,000 Sq. Ft: $349
5,001-7,000 Sq. Ft: $488
7,001+ Sq. Ft.: $698
Per permit/inspection
S - 424
Plan Check - Initial Submittal, New System: $401
or actual costs with charges at the fully allocated
hourly rates for all personnel involved plus any
outside costs.

Per plan check
S - 424
Plan Check - Tenant Improvement:
0-5,000 Sq. Ft: $401
5,001-25,000 Sq. Ft: $562
25,001-50,000 Sq. Ft: $722
>50,000 Sq. Ft., each add'l 1,000 sq.ft. $70.00
Per plan check
S - 425 Permit/Inspection: $279 Per permit/inspection
S - 425
Pre-Wire and Final Inspection:
0-5,000 Sq. Ft: $349
5,001-25,000 Sq. Ft: $488
25,001-50,000 Sq. Ft: $628
>50,000 Sq. Ft., each add'l 1,000 sq.ft. $70.00
Per inspection
S - 426 Plan Check - $482 Per plan check
S - 427 Permit/Inspection - $279 Per permit/inspection
S-430 Single Family Residential - included as part of
Building fees N/A
S - 431
Multi-Family, Commercial, or Industrial:

Plan Check - $241
Per plan check
S - 432 Permit/Inspection - $209 Per permit/inspection
S-440 Fire Fire Alt. Materials & Methods Rev $401 per application plus actual costs at the fully allocated hourly rates for all time after two hours Per application Fire Fire Protection Plan Single Family Dwelling: $963
Multiple Unit Site: $1,605
Fire Building Plan Check &
Permit/Inspection Per plan check. & permit/inspection
Fire Sprinkler Plan Check & Inspection
(Residential) Fire
Fire Alarm System - Plan Check &
Inspection Fire
Fire Specialty Protection System Plan
Check & Permit/Inspection Fire
Fire
Fire Sprinkler Plan Check & Permit
(Commercial) Fire
Fire Fire Solar System Plan Check &
Permit/Inspection

PUBLIC SAFETY
7 CITY OF SOLANA BEACH
Schedule of Fees
Effective March 17, 2025
Service Description of Fee for Service
Code # Dept Service Effective 03/17/25 Fee Instructions/Notes S-442 Fire Underground Tank Installation -
Removal P.C. Inspection $558 Per permit
S-444 Fire New Development Flow Test
S-446 Fire Miscellaneous Fire Inspection $209/hour Per inspection Fire AB-38 Compliance Inspection $209/hour Per inspection S-447 Fire After Hour Inspection Actual cost using fully allocated hourly rates ($293 minimum) Per inspection
S-448 Fire Standby Charge Actual cost using fully allocated hourly rates ($662 minimum) Per request
S-460 Fire Business Fire Safety Inspection
B, R2, R2.1 Occupancies:
0-1,000 SF - $140
1,001-3,500 SF - $279
3,501-10,000 SF - $419
10,001 SF - $907
All Other Occupancies:
0-1,000 SF - $279
1,001-3,500 SF - $488
3,501-10,000 SF - $628
10,001 SF - $1,117
Per in-City business certificate application (S-620) & renewal (S-626)
Fire State Mandated Inspections
State Mandated R-2 Inspections (Apartments):
3-10 units/building $482
11-40 units/building $642
>40 units/building $963
State Mandated R-1 Inspections (Hotels/Motels):
$963
State Mandated E Occupancies (Private):

Pre-School $562
Elementary/Middle School $963
High School $963
All annual inspection fees shall include time for the initial inspection and 1 reinspection. All subsequent reinspections may be charged an additional rate per inspection as determined by the AHJ.

S-470 Community Dev
(Codes) False Alarm
$50 for the first excessive false alarm
$100 for the second excessive false alarm
$150 for the third and each successive excessive
false alarm
SBMC 4.36
S-480 Marine Safety Marine Safety Junior Lifeguard Apparel & Accessories
Cost plus 25% for administrative fee rounded to
the nearest $1 dollar price increment
S-490 Marine Safety Marine Safety Junior Lifeguard Resident: $376 Non-Resident: $430
2-week sessions (4 AM & 4 PM), Groms (age 7-8) and Junior Lifeguards (ages 9-16)
Per session
This service is provided by the Water District.
8 CITY OF SOLANA BEACH
Schedule of Fees
Effective March 17, 2025
Service Description of Fee for Service
Code # Dept Service Effective 03/17/25 Fee Instructions/Notes S-510 Community Serv Special Event Permit
$53 Resident/Non-profit
$283 Non-resident
$867 for street closure
Per permit; Block Parties are exempt from street closure rate S-515 Community Serv Sound Permit $11 per application
S-519 Finance Liability Insurance set by City's Insurance Broker Per event or rental S-520 Community Serv Contract Enrichment Classes 100% cost recovery Per class; Class instructor receives 70% of the class fee and the City receives 30% of the class fee.

S-522 Community Serv Day Camp Program (weekly rates)
Day Camp, age 5-11:

Resident $180
Non-Resident $234
Day Camp After Care, age 5-11:

Resident $52
Non-Resident $79
Leader in Training, age 13-17: $45
S-524 Community Serv Sports Field Admin Residents $0
Non-residents $23 Per hour
S-526 Community Serv Facility Rental (Community Center) $10 Nonprofit
$71 Resident
$76 Non-resident
Per hour
S-530 Community Serv Fletcher Cove Community Center
Facility Rental
Friday 5pm -10pm & Sat/Sun 11am-10pm
Resident $50/hr, Non-resident $150/hr Non
refundable cleaning fee - $150
Refundable Security Deposit - $500
Trained Contract Staff - $28/hr
City Purchased Insurance - premium cost
City Purchased Insurance w Alcohol - premium
cost
Per SBMC 11.40.140
S-540 Community Serv Public Art Consignment Fee $117 + 25% of sale price if sold Per application for requests from artists to display their art in the public right of way per the MAP guidelines.

COMMUNITY SERVICES
9 CITY OF SOLANA BEACH
Schedule of Fees
Effective March 17, 2025
Service Description of Fee for Service
Code # Dept Service Effective 03/17/25 Fee Instructions/Notes S-610 Finance Short Term Vacation Rental Permit New: $253 per permit Renewal: $142 per permit Per permit
S-620 Finance New/Changed Business Certificate
Business located within the City: $309
Home Base: $124
Located outside the City: $93
Per application + S-460 for Business located within the City S-626 Finance Business Certificate Renewal
Business located within the City: $93
Home Base: $62
Located outside the City: $62
Per renewal + S-460 for Business located within the City S-628 Finance SB 1186 $4.00 SB 1186 Fee to be paid by all business certificate, regulatory, and STVR applicants Per application/renewal S-629 Finance STVR Permit Duplicate $43 Per duplicate
New: $459 per permit, plus $17 per Device
Renewal: $459
New: $459
Renewal: $287
New: $459
Renewal - $287
New: $459
Renewal - $287
New: $459
Renewal - $287
New: $459
Renewal - $287
New: $459 per permit plus $170 for each
additional solicitor
Renewal: $330
New: $545 per permit plus $30 for each cab
Renewal: $330 per permit plus $30 for each cab
New: $459
Renewal: $287
Late Fee - Renewal fee + 10%
S-639 Community Dev
(Codes) Newsstand/News Rack Permit $345 Per Permit
New: $437 Per Permit
Renewal: $308 Per Permit
S-660 Engineering Golf Cart Permit $66 Per permit
Per Permit, plus DOJ and other State Fees
Per Permit, plus DOJ and other State Fees
Per Permit, plus DOJ and other State Fees
CA MTC Certified Massage
Tech/Business Registration
Community Dev
(Codes)
Per Permit, plus DOJ and other State Fees
Per Permit, plus DOJ and other State Fees
Per Permit, plus DOJ and other State Fees
Per Permit, plus DOJ and other State Fees
Per Permit, plus DOJ and other State Fees
Community Dev
(Codes)
Amusement Permit
Community Dev
(Codes)
Entertainment Permit
Solicitors Permit
Community Dev
(Codes)
Per Permit, plus DOJ and other State Fees
Massage Establishment Permit
Firearms Permit
Tobacco Sales Permit
Community Dev
(Codes)
Taxi Business Permit
S-632
S-633
S-634
S-630
S-631

PERMIT REGISTRATION SERVICES
S-637 Community Dev
(Codes)
Community Dev
(Codes)
Community Dev
(Codes)
Community Dev
(Codes)
S-636
Community Dev
(Codes)
Dance Permit
S-635 Secondhand Dealer Permit
S-638
10 CITY OF SOLANA BEACH
Schedule of Fees
Effective March 17, 2025
Service Description of Fee for Service
Code # Dept Service Effective 03/17/25 Fee Instructions/Notes S-640 Finance Administrative Citation
Fines shall be assessed in the amounts specified
by resolution of the city council, or, where no
amount is specified: A fine not
exceeding $100.00 for a first violation;
A fine not exceeding $200.00 for a second
violation of the same ordinance, term, or condition
within one year from the date of the first violation;
A fine not exceeding $500.00 for each additional
violation of the same ordinance, term or condition
within one year from the date of the first violation.
(Ord. 283 § 2, 2002)
SBMC 1.18.030
S-645 Finance STVR - Permit Violation Penalties
First Violation in 12-month period - $500
Second Violation in 12-month period - $1,000
Third Violation in 12-month period - Permit
revocation and hearing pursuant to SBMC

4.04.110
SBMC 4.47.070
S-711 City Clerk Notary Public Service $15 per Signature Per signature; limited to $15 by State law.

S-712 City Clerk Document Certification $140 Per item
Audio CD: $53
DVD: $40
Convert VHS to DVD: Actual Costs
Convert Audio Cassette to CD/MP4: Actual Costs
S-716 City Clerk Annual Agenda Mailing Subscription $577 Per Annual Subscription S-717 City Clerk Annual Agenda Packet Mailing
Subscription $2,865 Per Annual Subscription
S-718 City Clerk Special Notice Subscription $101 Per Annual Subscription S-719 City Clerk Document Print/Copy
All Copies:

First 10 pages - No Charge $0.21 per page for
every page thereafter
Document Imaging:

First 10 pages - No Charge $0.15 per page for
every page thereafter
Data Copy: $53 per device
Maps/Blueprints: Actual Costs
Per request
S-720 City Clerk Candidate Processing $25 Per application; fee set by the State S-721 City Clerk Initiative Processing $200 Per initiative; fee set by the State S-722 City Clerk Verification of Residency $140 Per request S-740 Finance NSF Check $25 $25 first check, $35 each subsequent check - set by State S-750 Finance Credit Card Convenience Fee set by City's Third-Party Credit Card Processor Per credit card charge S-760 Various Technology Surcharge
S-715 City Clerk Audio/Video Tape Reproduction
Charge 5.0% of all Plan Check and Permit fees and Entitlements (except Impact Fees)

ADMINISTRATIVE SERVICES
Per item
11 Attachment A - Building Valuation Data
AUGUST 2024
The International Code Council is pleased to provide the following Building Valuation Data (BVD) for its members. The BVD will be updated at six-month intervals, with the next update in February 2025. ICC strongly recommends that all jurisdictions and other interested parties actively evaluate and assess the impact of this BVD table before utilizing it in their current code enforcement related activities.

The BVD table provides the “average” construction costs per square foot, which can be used in determining permit fees for a jurisdiction. Permit fee schedules are addressed in Section 109.2 of the 2024 International Building Code (IBC) whereas Section 109.3 addresses building permit valuations. The permit fees can be established by using the BVD table and a Permit Fee Multiplier, which is based on the total construction value within the jurisdiction for the past year. The Square Foot Construction Cost table presents factors that reflect relative value of one construction classification/occupancy group to another so that more expensive construction is assessed greater permit fees than less expensive construction.

ICC has developed this data to aid jurisdictions in determining permit fees. It is important to note that while this BVD table does determine an estimated value of a building (i.e., Gross Area x Square Foot Construction Cost), this data is only intended to assist jurisdictions in determining their permit fees. This data table is not intended to be used as an estimating guide because the data only reflects average costs and is not representative of specific construction.

This degree of precision is sufficient for the intended purpose, which is to help establish permit fees so as to fund code compliance activities. This BVD table provides jurisdictions with a simplified way to determine the estimated value of a building that does not rely on the permit applicant to determine the cost of construction. Therefore, the bidding process for a particular job and other associated factors do not affect the value of a building for determining the permit fee. Whether a specific project is bid at a cost above or below the computed value of construction does not affect the permit fee because the cost of related code enforcement activities is not directly affected by the bid process and results.

Building Valuation
The following building valuation data represents average valuations for most buildings. In conjunction with IBC Section 109.3, this data is offered as an aid for the building official to determine if the permit valuation is underestimated. Again it should be noted that, when using this data, these are “average” costs based on typical construction methods for each
occupancy group and type of construction. The average costs include foundation work, structural and nonstructural
building components, electrical, plumbing, mechanical and interior finish material. The data is a national average and does not take into account any regional cost differences. As such, the use of Regional Cost Modifiers is subject to the authority having jurisdiction.

Permit Fee Multiplier
Determine the Permit Fee Multiplier:

1. Based on historical records, determine the total annual construction value which has occurred within the
jurisdiction for the past year.

2. Determine the percentage (%) of the building
department budget expected to be provided by building
permit revenue.

3. Bldg. Dept. Budget x (%)
Permit Fee Multiplier =
Total Annual Construction Value
Example
The building department operates on a $300,000 budget, and it expects to cover 75 percent of that from building permit fees.

The total annual construction value which occurred within the jurisdiction in the previous year is $30,000,000.
$300,000 x 75%
Permit Fee Multiplier = = 0.0075
$30,000,000
Permit Fee
The permit fee is determined using the building gross area, the Square Foot Construction Cost and the Permit Fee Multiplier.

Permit Fee = Gross Area x Square Foot Construction Cost X Permit Fee Multiplier
Example
Type of Construction: IIB
Area: 1st story = 8,000 sq. ft.
2nd story = 8,000 sq. ft.

Height: 2 stories
Permit Fee Multiplier = 0.0075
Use Group: B

1. Gross area:

Business = 2 stories x 8,000 sq. ft. = 16,000 sq. ft.

2. Square Foot Construction Cost:

B/IIB = $260.46/sq. ft.

3. Permit Fee:

Business = 16,000 sq. ft. x $260.46/sq. ft x 0.0075
= $31,255
<<A-1>>
Important Points
• The BVD is not intended to apply to alterations or
repairs to existing buildings. Because the scope of
alterations or repairs to an existing building varies so greatly, the Square Foot Construction Costs table does
not reflect accurate values for that purpose. However,
the Square Foot Construction Costs table can be used
to determine the cost of an addition that is basically a stand-alone building which happens to be attached to
an existing building. In the case of such additions, the only alterations to the existing building would involve the attachment of the addition to the existing building and the openings between the addition and the existing
building.
• For purposes of establishing the Permit Fee Multiplier, the estimated total annual construction value for a given time period (1 year) is the sum of each building’s value (Gross Area x Square Foot Construction Cost) for that
time period (e.g., 1 year).
• The Square Foot Construction Cost does not include
the price of the land on which the building is built. The Square Foot Construction Cost takes into account
everything from foundation work to the roof structure
and coverings but does not include the price of the land.

The cost of the land does not affect the cost of related code enforcement activities and is not included in the
Square Foot Construction Cost.

Square Foot Construction Costs a, b, c
Group (2024 International Building Code) IA IB IIA IIB IIIA IIIB IV VA VB A-1 Assembly, theaters, with stage 333.98 322.10 312.59 300.28 280.58 272.46 290.01 261.47 251.46 A-1 Assembly, theaters, without stage 306.63 294.75 285.24 272.92 253.47 245.34 262.66 234.35 224.35 A-2 Assembly, nightclubs 264.07 256.33 248.28 238.82 223.69 217.61 230.62 203.42 195.71 A-2 Assembly, restaurants, bars, banquet halls 263.07 255.33 246.28 237.82 221.69 216.61 229.62 201.42 194.71 A-3 Assembly, churches 311.21 299.32 289.82 277.50 258.18 250.05 267.24 239.06 229.06 A-3 Assembly, general, community halls, libraries,
museums 261.35 249.47 238.96 227.64 207.19 200.06 217.38 188.07 179.07 A-4 Assembly, arenas 305.63 293.75 283.24 271.92 251.47 244.34 261.66 232.35 223.35 B Business 292.48 282.09 271.97 260.46 237.85 229.40 250.46 212.56 202.84 E Educational 279.20 269.50 260.98 250.17 233.48 221.55 241.57 204.55 198.00 F-1 Factory and industrial, moderate hazard 162.52 154.68 144.93 139.48 124.19 118.17 132.99 102.98 95.90 F-2 Factory and industrial, low hazard 161.52 153.68 144.93 138.48 124.19 117.17 131.99 102.98 94.90 H-1 High Hazard, explosives 151.65 143.81 135.05 128.61 114.61 107.60 122.11 93.40 N.P.

H234 High Hazard 151.65 143.81 135.05 128.61 114.61 107.60 122.11 93.40 85.33 H-5 HPM 292.48 282.09 271.97 260.46 237.85 229.40 250.46 212.56 202.84 I-1 Institutional, supervised environment 264.93 255.57 246.84 238.11 217.64 211.63 238.15 195.82 189.67 I-2 Institutional, hospitals 459.84 449.45 439.33 427.82 403.26 N.P. 417.81 377.98 N.P.

I-2 Institutional, nursing homes 319.21 306.86 296.74 285.23 264.10 N.P. 275.22 238.82 N.P.

I-3 Institutional, restrained 341.48 331.09 320.97 309.46 288.34 278.89 299.46 263.05 251.33 I-4 Institutional, day care facilities 264.93 255.57 246.84 238.11 217.64 211.63 238.15 195.82 189.67 M Mercantile 197.08 189.34 177.79 171.82 156.33 151.25 163.63 136.06 129.35 R-1 Residential, hotels 267.42 258.06 249.33 240.60 220.62 214.60 240.64 198.79 192.64 R-2 Residential, multiple family 223.61 214.25 205.52 196.79 177.77 171.76 196.82 155.95 149.80 R-3 Residential, one- and two-family d 211.77 205.84 200.99 197.13 190.36 183.32 193.75 177.67 167.37 R-4 Residential, care/assisted living facilities 264.93 255.57 246.84 238.11 217.64 211.63 238.15 195.82 189.67 S-1 Storage, moderate hazard 150.65 142.81 133.05 127.61 112.61 106.60 121.11 91.40 84.33 S-2 Storage, low hazard 149.65 141.81 133.05 126.61 112.61 105.60 120.11 91.40 83.33 U Utility, miscellaneous 115.27 108.48 100.93 96.59 86.02 80.36 91.94 68.09 64.85 a. Private Garages use Utility, miscellaneous
b. For shell only buildings deduct 20 percent
c. N.P. = not permitted
d. Unfinished basements (Group R-3) = $31.50 per sq. ft. <<A-2>>
ATTACHMENT "B"

BUILDING PERMIT FEE SCHEDULE
Service
Code # TOTAL VALUATION * BASE BUILDING PERMIT FEE *
$1.00 to $500.00 $41.00
$500.01 to $2,000.00
$41 for the first $500 plus $5.36 for each additional
$100, or fraction thereof, to and including $2,000.00
$2,000.01 to $25,000.00
$121 for the first $2,000 plus $24.68 for each additional $1,000, or fraction thereof, to and including $25,000
$25,000.01 to $50,000.00
$689 for the first $25,000 plus $17.83 for each
additional $1,000, or fraction thereof, to and including $50,000
$50,000.01 to $100,000.00
$1,135 for the first $50,000 plus $12.35 for each
additional $1,000, or fraction thereof, to and including $100,000
$100,000.01 to $500,000.00
$1,752 for the first $100,000 plus $9.88 for each
additional $1,000, or fraction therefor, to and including $500,000
$500,000.01 to $1,000,000.00
$5,705 for the first $500,000 plus $8.38 for each
additional $1,000, or fraction thereof, to and including $1,000,000
$1,000,000.01+
$9,892 for the first $1,000,000 plus $5.56 for each
additional $1,000, or fraction thereof
S-212 Permit Issuance Fee $51.00
S-220 Individual Plumbing Permit $172.00
S-230 Individual Electrical Permit $172.00
S-240 Individual Mechanical Permit $172.00
S-233 Water Heater Permit $103.00
S-222 Plumbing Permit 7% of Base Permit Fee
S-232 Electrical Permit 7% of Base Permit Fee
S-242 Mechanical Permit 7% of Base Permit Fee
S-250 Energy Surcharge Fee 15% of Base Permit Fee
S-252 Disabled Access Surcharge Fee 10% of Base Permit Fee S-255 Plan Check Fee 85% of Building Permit Fee
NOTES:

S-260
S-262
S-265
*
(Residential sub-division or tract development projects may have production units that are duplicates of the model units reduced to 30% of the permit fee)
S-210

ASSOCIATED FEES
(Disabled Access fee applies to Commercial, Industrial, Assembly, Educational and Multi-Family type projects as required by State Building Code)
In Combination with Building Permit
A Building Permit shall include only a single issuance fee if the permit has a combination of activities (i.e.:

Building/Plumbing/Electrical/Mechanical.)
Projects requiring plan revisions or having a new scope of work shall be charged a fee determined by using the current preferred hourly rate as established by EsGil Corporation.

Expedited processing is only available for unusual circumstances as deemed appropriate by City Staff.

Charges for expedited services shall be determined by using an hourly rate of two times the current preferred hourly rate as established by EsGil Corporation.

Projects requiring special inspections or additional re-inspections shall be charged a fee determined by using the current preferred hourly rate as established by EsGil Corporation.

Upon initial submittal to the City, permit fees based on valuations will be calculated using the valuations listed in Attachment A of the Fee Schedule. This will be the minimum fee charged for the permit. If upon a subsequent submittal, the valuation decreases, no refund based on the decreased valuation will be provided to the applicant. If the valuation increases, additional permit fees will be calculated based on the difference between the valuation used to calculate the minimum fee and the increased valuation. <<B-1>>
I I
Service
Code #
CY2024 CY2025
S-322 Transportation Impact Fee: Ordinance 479 Fee % Change Fee Rate Category
Residential: Single Family $ 19,089.00 Per Unit $ 18,924.00 1.0087 Residential: Condo & Multi-Family $ 13,613.00 Per Unit $ 13,496.00 1.0087 Residential: ADU $ 4,773.00 Per Unit $ 4,732.00 1.0087
Retail, Commercial & Shopping $ 20,740.00 Per 1,000 SF 20,561.00 $ 1.0087 Office & Employment Center $ 12,772.00 Per 1,000 SF 12,662.00 $ 1.0087 Industrial $ 3,750.00 Per 1,000 SF 3,718.00 $ 1.0087
Lodging & Resort $ 13,325.00 Per 1,000 SF 13,210.00 $ 1.0087 Educational & Institutional $ 11,228.00 Per 1,000 SF 11,131.00 $ 1.0087 Other $ 161.27 Per TDU $ 159.88 1.0087
S-330 Fire Mitigation Impact Fee (FMIF): Ordinance 492/Resolution 2018-147 Detached Dwelling $ 1,894.00 Per Unit $ 1,848.00 1.025
Attached Dwelling $ 267.00 Per Unit $ 260.00 1.025
Hotels/Motels $ Per Keyed Room 874.00 896.00 $ 1.025
Commercial/Service $ 0.13 Per Sq Ft $ 0.13 1.025
Office/Professional $ 0.14 Per Sq Ft $ 0.14 1.025
Light Industrial $ 0.10 Per Sq Ft $ 0.10 1.025
Public/Institutional Uses $ 0.05 Per Sq Ft $ 0.05 1.025 Residential Remodel $ 0.73 Per Sq Ft $ 0.71 1.025
S-332 Park Development Impact Fee (PDIF): Ordinance 493/Resolution 2018-147 Detached Dwelling $ 7,445.00 Per Unit $ 7,263.00 1.025
Attached Dwelling $ 5,386.00 Per Unit $ 5,255.00 1.025
Residential Remodel
New Bedroom $ 19.97 Per Sq Ft $ 19.48 1.025
Less, Bedroom Demo $ (19.97) Per Sq Ft $ (19.48) 1.025
S-334 Public Use Facilities Impact Fee (PUFIF): Ordinance 496/Resolution 2018-147 Detached Dwelling $ 689.00 Per Unit $ 672.00 1.025
Attached Dwelling $ 499.00 Per Unit $ 487.00 1.025
Residential Remodel
New Bedroom $ 1.85 Per Sq Ft $ 1.80 1.025
Less, Bedroom Demo $ (1.85) Per Sq Ft $ (1.80) 1.025
S-338 Public Recreation Impact Fee (PRIF): Resolution 2018-140 Initial Area $ 145.00 Per Sq Ft $ 142.00 1.021
Bluff Retreat $ Per Linear Ft 982.00 $ 926.00 1.060
ATTACHMENT "C"
Fee Rate

IMPACT FEE SCHEDULE
Calendar Year 2025 - Effective March 17, 2025
<<C-1>>
City of Solana Beach
User Fee Study
i Comprehensive User Fee Study

TABLE OF CONTENTS
TABLE OF CONTENTS ................................................................................................. i Executive Summary .................................................................................................. 1 User Fee Background ............................................................................................... 2 Background .................................................................................................................................................. 2 California User Fee History .......................................................................................................................... 2 Additional Policy Considerations ................................................................................................................. 3 Study Objective ....................................................................................................... 4 Scope of the Study ....................................................................................................................................... 4 Aim of the Report......................................................................................................................................... 5 Project Approach and Methodology ........................................................................... 6 Conceptual Approach................................................................................................................................... 6 Fully Burdened Hourly Rates........................................................................................................................ 6 Summary Steps of the Study ........................................................................................................................ 7 Allowable Costs ............................................................................................................................................ 7 Methodology ................................................................................................................................................ 8 Quality Control/Quality Assurance .............................................................................................................. 8 Reasons for cost increases/decreases over current fees............................................................................. 8 City Staff Contributions ................................................................................................................................ 9 Solana Beach User Fees .......................................................................................... 10 Cost Recovery............................................................................................................................................. 10 Subsidization .............................................................................................................................................. 10 Impact on Demand (Elasticity) ................................................................................................................... 11 Summary .................................................................................................................................................... 11 Administrative Services .......................................................................................... 12 Analysis ...................................................................................................................................................... 12 Permit Registration Services ................................................................................... 13 Analysis ...................................................................................................................................................... 13 Community Development ....................................................................................... 14 Analysis ...................................................................................................................................................... 14 Building ................................................................................................................ 15 ii Comprehensive User Fee Study
Analysis ...................................................................................................................................................... 15 Engineering .......................................................................................................... 16 Analysis ...................................................................................................................................................... 16 Public Safety ......................................................................................................... 17 Analysis ...................................................................................................................................................... 17 Community Services ............................................................................................... 18 Analysis ...................................................................................................................................................... 18 Appendix A – Total Allowable Cost to be Recovered .................................................. 19 Appendix B –Fully Burdened Hourly Rates ................................................................ 20 Appendix C – Cost Recovery Analysis ....................................................................... 23

1 Comprehensive User Fee Study
Executive Summary
The City of Solana Beach engaged Willdan Financial Services (Willdan) to determine the full costs incurred by the City to support the various activities for which the City charges user fees. Due to the complexity and the breadth of performing a comprehensive review of fees, Willdan employed a variety of fee methodologies to identify the full costs of individual fee and program activities. This report and the appendices herein identify 100% full cost recovery for City services. Appendix C details the full cost and suggested fees as determined through discussion with departmental staff. The recommended fees identified herein are either at or less than full cost recovery.

2 Comprehensive User Fee Study
User Fee Background
Background
As part of a general cost recovery strategy, local governments adopt user fees to fund programs and services that provide limited or no direct benefit to the community as a whole (“User Fees”). As cities struggle to maintain levels of service and variability of demand, they have become increasingly aware of subsidies provided by the General Fund and have implemented cost-recovery targets. To the extent that governments use general tax monies to provide individuals with private benefits, and not require them to pay the full cost of the service (and, therefore, receive a subsidy), the government is limiting funds that may be available to provide other community-wide benefits. In effect, the government is using community funds to pay for private benefits. Unlike most revenue sources, cities have more control over the level of user fees they charge to recover costs, or the subsidies they can institute.

Fees in California are required to conform to the statutory requirements of the California Constitution, Proposition 218, Proposition 26, and the California Code of Regulations. The Code also requires that the City Council adopt fees by either ordinance or resolution, and that any fees in excess of the estimated total cost of rendering the related services must be approved by a popular vote of two-thirds of those electors voting because the charge would be considered a tax and not a fee. There are no fees suggested to be set above the cost of service and as such a public vote is not required.

California User Fee History
Before Proposition 13, in times of fiscal shortages, California cities were able to raise property taxes, which funded everything from police and recreation to development-related services. However, this situation changed with the passage of Proposition 13 in 1978.

Proposition 13 established the era of revenue limitation in California local government. In subsequent years, the state saw a series of additional limitations to local government revenues. Proposition 4 (1979) defined the difference between a tax and a fee: a fee can be no greater than the cost of providing the service; and Proposition 218 (1996) further limited the imposition of taxes for certain classes of fees. As a result, cities were required to secure a supermajority vote in order to enact or increase taxes. Due to the thresholds needed to increase local taxes, cities have less control and very few successful options for new revenues.

The State of California took a series of actions in the 1990’s and 2000’s to improve the State’s fiscal situation, at the expense of local governments. In 2004-05, the Educational Revenue Augmentation Funds (“ERAF”) take-away of property taxes and the reduction of Vehicle License Fees further reduced local tax revenues.

In addition, on November 2, 2010, California voters approved Proposition 26, the “Stop Hidden Taxes Initiative”, which is aimed at defining “regulatory fees” as a special tax rather than a fee, thus requiring approval by two-thirds vote of local voters. These regulatory fees are typically intended to mitigate the societal and environmental impacts of a business or person’s activities. Proposition 26 contains seven categories of exceptions. The fees analyzed as part of a user fee study typically fall under categories one through five consisting of charges for specific benefits, government service, regulatory need, for use of government property, or a fine/penalty.
3 Comprehensive User Fee Study
Additional Policy Considerations
State regulations require that municipalities update their fee schedules to reflect the actual costs of certain public services primarily benefiting users. User fees recover costs associated with the provision of specific services benefiting the user, thereby typically reducing the use of General Fund monies for such purposes.

In addition to collecting the direct cost of labor and materials associated with processing and administering user services, it is common for local governments to recover reasonable support costs. Support costs are those costs relating to a local government’s central service departments that are allocable to the local government’s operating departments. Central services support cost allocations were incorporated using the resulting indirect overhead percentages determined through the City’s cost allocation plan. A cost allocation plan identifies the central service functions of the City such as Finance, City Manager, and Human Resources and allocates their costs to the departments and funds of the City that they support. This plan was used in the user fee study to account for the burden placed upon central services by the operating departments in order to allocate a proportionate share of central service cost through the study.

As labor effort and costs associated with the provision of services fluctuate over time, a significant element in the development of any fee schedule is that it has the flexibility to remain current. Therefore, it is recommended that the City include an inflationary factor in the resolution adopting the fee schedule to allow the City to annually increase or decrease the fees by changes in a pre-approved inflationary index, as described below. However, such inflationary increases shall not exceed the reasonable estimated cost of providing the services each year.

The City may employ many different inflationary factors. The most commonly used inflator is some form of the Consumer Price Index (CPI) as it is widely well known and accepted. A similar inflator is the implicit price deflator for GDP, which is much like the CPI except that while the CPI is based on the same “basket” of goods and services every year, the price deflators’ “basket” can change year to year. Since the primary factor for the cost of a City’s services is usually the costs of the personnel involved, tying an inflationary factor that connects more directly to the personnel costs can also be suitable if there is a clear method, or current practice of obtaining said factor.

Each City should use an inflator that they believe works the best for their specific situation and needs but cannot rely solely on the CPI increase as it is incumbent upon each agency to ensure the amount of the fees charged does not exceeds the reasonable estimated costs of providing the services. It is also recommended that the City perform this internal review annually with a comprehensive review of services and fees performed every five years, which would include adding, amending, or removing fees for programs/services.
4 Comprehensive User Fee Study
Study Objective
As the City of Solana Beach seeks to efficiently manage limited resources and adequately respond to increased service demands, it needs a variety of tools. A user fee study provides assurance that the City has the best information and the best resources available to make sound decisions, fairly and legitimately set fees, maintain compliance with state law and local policies, and meet the needs of the City administration and its constituency. Given the limitations on raising revenue in local government, the City recognizes that a user fee Study is a very cost-effective way to understand the total cost of services and identify potential fee deficiencies. Essentially, a user fee is a payment for a requested service provided by a local government that primarily benefits an individual or group.

The total cost of each service included in this analysis is based on the full cost of providing City services, including direct salaries and benefits of City staff, direct departmental costs, and indirect costs from central service support. This study determines the full cost recovery fee for the City to provide each service; however, each fee is set at the City’s discretion, up to 100% of the total cost, as specified in this report.

The principal goal of the study was to help the City determine the full cost of the services that the City provides. In addition, Willdan established a series of additional objectives including:
 Developing a rational basis for setting fees
 Identifying subsidy amount, if applicable, of each fee in the model  Ensuring compliance with State law
 Developing an updatable and comprehensive list of fees  Maintaining accordance with City policies and goals
The study results will help the City better understand its true costs of providing services and may serve as a basis for making informed policy decisions regarding the most appropriate fees, if any, to collect from individuals and organizations that require individualized services from the City.

Scope of the Study
The scope of this study encompasses a review and calculation of the user fees charged by the following Solana Beach departments and fee groups:
 Administrative Services
 Permit Registration Services
 Community Development - Planning
 Building
 Engineering
 Public Safety
 Community Services
5 Comprehensive User Fee Study
The study involved the identification of existing and potential new fees, fee schedule restructuring, data collection and analysis, orientation and consultation, quality control, communication and presentations, and calculation of individual service costs (fees) or program cost recovery levels.

Aim of the Report
The user fee study focused on the cost of City services, as City staff currently provide them at existing, known, or reasonably anticipated service and staff level needs. This report provides a summary of the study results, and a general description of the approach and methods Willdan and City staff used to determine the recommended fee schedule. The report is not intended to document all of the numerous discussions throughout the process, nor is it intended to provide an influential dissertation on the qualities of the utilized tools, techniques, or alternative approaches.

6 Comprehensive User Fee Study
Project Approach and Methodology
Conceptual Approach
The basic concept of a user fee study is to determine the “reasonable cost” of each service provided by the City for which it charges a user fee. The full cost of providing a service may not necessarily become the City’s fee, but it serves as the objective basis as to the maximum amount that may be collected.

The standard fee limitation established in California law for such fees is the “estimated, reasonable cost” principle. In order to maintain compliance with the letter and spirit of this standard, every component of the fee study process included a related review. The use of budget figures, time estimates, and improvement valuation clearly indicates reliance upon estimates for some data.

Fully Burdened Hourly Rates
The total cost of each service included in this analysis is primarily based on the Fully Burdened Hourly Rates (FBHRs) that were determined for City personnel directly involved in providing services. The FBHRs include not only personnel salary and benefits (see Appendix B), but also any costs that are reasonably ascribable to personnel. The cost elements that are included in the calculation of fully burdened rates are:
 Salaries & benefits of personnel involved
 Operating costs applicable to fee operations
 Departmental support, supervision, and administration overhead  Central service overhead costs allocated through the cost allocation plan An important factor in determining the fully burdened rate is in the calculation of productive hours for personnel. This calculation takes the available workable hours in a year of 2,080 and adjusts this figure to 1,650 productive or billable hours to account for calculated or anticipated hours’ employees are involved in non-billable activities such as paid vacation, sick leave, holidays, and other considerations as necessary.

Dividing the full cost, including overhead, of a position by the number of productive hours provides the FBHR.

The FBHRs are then used in conjunction with time estimates, when appropriate for how a service is provided, to calculate a fee’s cost based on the personnel and the amount of their time that is involved in providing each service.
7 Comprehensive User Fee Study
Summary Steps of the Study
The process of the study is straightforward and simple in concept. The following list provides a summary of the study process steps:

Allowable Costs
This report identifies three types of costs that, when combined, constitute the fully burdened cost of a service (Appendix A). Costs are defined as
direct labor, including salary and benefits,
departmental overhead costs, and the City’s
central services overhead, where
departmental and central service overhead
costs constitute support costs. These cost
types are defined as follows:
 Direct Labor (Personnel Costs): The
costs related to staff salaries for
time spent directly on fee-related
services.
 Departmental Overhead: A
proportional allocation of
departmental overhead costs,
including operation costs such as
supplies and materials that are necessary for the department to function.  Central Services Overhead: These costs, as provided via the City’s cost allocation plan, represent services provided by those central services departments whose primary function is to support other City departments.

Data Analysis
Department Interviews
Time Estimates
Labor Costs
Cost Allocation Plan
Building Cost Layers
Direct Services
Indirect Services
Department Overhead
City-Wide Overhead
Set Fees
Define the Full Cost of
Services
Set Cost Recovery Policy
• • •
• •
8 Comprehensive User Fee Study
Methodology
The two methods of analysis for calculating fees used in this report are the:

Case Study Method (Standard Unit Cost Build-Up Approach): This approach estimates the actual labor and material costs associated with providing a unit of service to a single user. This analysis is suitable when City staff time requirements do not vary dramatically for a service, or for special projects where the time and cost requirements are easy to identify at the project’s outset. Further, the method is effective in instances when a staff member from one department assists on an application, service or permit for another department on an as-needed basis. Costs are estimated based upon interviews with City staff regarding the time typically spent on tasks, a review of available records, and a time and materials analysis.

Program Cost Approach: In some instances, the underlying data is not available or varies widely, leaving a standard unit cost build-up approach impractical. In addition, market factors and policy concerns (as opposed to actual costs) tend to influence rental based fee levels more than other types of services. Willdan employed a different methodology where appropriate to fit a programs’ needs and goals. Typical programmatic approach cases are facility use fees, penalties, and instances where a program cost is divided over the user base to obtain a per applicant cost for shared cost services.

Quality Control/Quality Assurance
All study components are interrelated, thus flawed data at any step in the process will cause the ultimate results to be inconsistent and unsound. The elements of our Quality Control process for user fee calculations include:
 Involvement of knowledgeable City staff
 Clear instructions and guidance to City staff
 Reasonableness tests and validation
 Internal and external reviews
 Cross-checking
Reasons for cost increases/decreases over current fees
Within the fee tables in Appendix C, the differences are identified between the full costs calculated through the study and the fee levels currently in effect. The reasons for differences between the two can arise from a number of possible factors including:
 Previous fee levels may have been set at levels less than full cost intentionally, based on policy decisions
 Staffing levels and the positions that complete fee and service activity may vary from when the previous costs were calculated
 Personnel and materials costs could have increased at levels that differed from any inflationary factors used to increase fees since the last study
 Costs that this study has identified as part of the full cost of services may not have been accounted for in a previous study
9 Comprehensive User Fee Study
o Departmental overhead and administration costs
o Indirect overhead from the cost allocation plan
 Changes in processes and procedures within a department, or the City as a whole  Changes in the demand for services in a City may have also changed the staffing or cost structure of departments over time
City Staff Contributions
As part of the study process, Willdan received tremendous support and cooperation from City staff, which contributed and reviewed a variety of components to the study, including:
 Budget and other cost data
 Staffing structures
 Fee and service structures, organization, and descriptions  Direct and indirect work hours (billable/non-billable)  Time estimates to complete work tasks
 Review of draft results and other documentation
A user fee study requires significant involvement of the managers and line staff from the departments on top of their existing workloads and competing priorities. The contributions from City staff were critical to this study. We would like to express our appreciation to the City and its staff for their assistance, professionalism, positive attitudes, helpful suggestions, responsiveness, and overall cooperation. 10 Comprehensive User Fee Study
Solana Beach User Fees
Cost Recovery
The cost recovery models, by department/division fee type, are presented in detail in Appendix C. Full cost recovery is determined by summing the estimated amount of time each position (in increments of minutes or hours) spends to render a service. Time estimates for each service rendered were obtained through interviews conducted with City staff for each department/division fee included in the study. The resulting cost recovery amount represents the total cost of providing each service. The City’s current fee being charged for each service, if applicable, is provided in this section, as well, for reference.

It is important to note that the time data used to determine the amount of time each employee spends assisting in the provision of the services listed on the fee schedule is essential in identifying the total cost of providing each service and will differ from City to City depending on staffing, positions involved, experience of staff, the use of consultants, and the policies and procedures in place for each City.

Specifically, in providing services, a number of employees are often involved in various aspects of the process, spending anywhere from a few minutes to several hours on the service.

The primary goal of this study was to identify the cost of City services, to provide information to help the City make informed decisions regarding the actual fee levels and charges. The responsibility of determining the final fee levels is a complicated task. City staff must consider many issues in formulating recommendations, and the City Council must consider those same issues and more in making the final decisions.

City staff assume the responsibility to develop specific recommendations to present to the City Council.

Unfortunately, there are no hard and fast rules to guide the City, since many of the considerations are based on the unique characteristics of the City of Solana Beach, and administrative and political discretion.

However, in setting the level of full cost recovery for each fee, one should consider whether the service solely benefits one end user or the general community.

Subsidization
Recalling the definition of a user fee helps guide decisions regarding subsidization. The general standard is that individuals (or groups) who receive a wholly private benefit should pay 100% of the full cost of the services. In contrast, services that are simply public benefit should be funded entirely by the general fund’s tax dollars. Unfortunately, for the decision makers, some services fall into the range between these two extremes.

Further complicating the decision, opponents of fees often assert that the activities subject to the fees provide economic, cultural, “quality of life,” or other community benefits that exceed the costs to the City, but it is important to distinguish the difference between any purported possible benefits that may be conveyed through the result of activities of the service receiver and the direct benefit being conveyed through the City providing the service to the requestor.

It is recommended the City consider such factors during its deliberations regarding appropriate fee levels. 11 Comprehensive User Fee Study
Of course, subsidization can be an effective public policy tool since it can be used to reduce fees to encourage certain activities (such as to ensure public safety) or allow some people to be able to afford to receive services they otherwise could not at the full cost. In addition, subsidies can be an appropriate and justifiable action, such as to allow citizens to rightfully access services, without overburdensome costs.

Despite the intent, it is important for the City and public to understand that subsidies must be covered by another revenue source, typically the General Fund’s other unrestricted funds.

Impact on Demand (Elasticity)
Economic principles of elasticity suggest that increased costs for services (higher fees) will eventually curtail the demand for the services; whereas lower fees may spark an incentive to utilize the services and encourage certain actions. Either of these conditions may be a desirable effect to the City. However, the level of the fees that would cause demand changes is largely unknown. The cost of service study did not attempt to evaluate the economic or behavioral impacts of higher or lower fees; nevertheless, the City should consider the potential impacts of these issues when deciding on fee levels.

Summary
City staff is recommending setting user fees at suggested fee amounts as detailed in Appendix C. City and departmental goals, City Council priorities, policy initiatives, past performance, implementation issues, and other internal and external factors should influence staff recommendations and City Council decisions. In this case, the proper identification of additional services (new or existing services) and the update to a consistent and comprehensive fee schedule were the primary objectives of this study. City staff have reviewed the full costs and identified the recommended fee levels for consideration by the City Council.

The following sections provide background for each department, division, and fee group and the results of this study’s analysis of their fees. For the full list of each fee’s analysis, refer to Appendix C of this report. 12 Comprehensive User Fee Study
Administrative Services
The City Clerk’s office is responsible for providing regulatory oversight as per the Government Code and state regulatory agencies as needed and required, including the Fair Political Practices Commission. The Clerk’s department records and archives the City Council legislative history into a document imaging system to assist in the research and retrieval process. The department also coordinates with City departments all official records of the City including the records maintenance schedule and destruction of outdated records.

The City Clerk acts as the City’s election official and administers all City elections. Other responsibilities include codifying the Municipal Code, certifying official documents, and administering oaths. The City Clerk’s department manages front desk operations including greeting, phones, receipting, mail, general information, and citywide / City Clerk administration.

The Finance Department maintains the financial records of the City, the Successor Agency and the former Solana Beach Redevelopment Agency. The Finance Department is responsible for managing its budget unit and the budgets for Support Services, Risk Management, Workers Compensation administration, Asset Replacement, Real Property Acquisition, and the OPEB Fund.

Analysis
Willdan individually reviewed the services associated with Administrative Services. The review also consisted of an evaluation of existing services in an effort to update the fee schedule.

The services included in Administrative Services are a mixture of administrative citations, permit violation penalties, a document certification fee, agenda mailing services, tape reproduction fees, document copy fees, a verification of residency fee, notary public service, credit card convenience fee, technology surcharge, and a non-sufficient fund fee which is set by the State. The analysis relied primarily upon a standard unit cost build-up approach, whereby we determined the reasonable cost of each fee occurrence using staff time to recover the direct cost of staff and the pro-rata share of departmental costs, including indirect costs for City central services. Willdan then compared the calculated full cost against the current fee amount to determine, if charged, whether the current fee is recovering the costs associated with the requested service. The analysis found that the Document Certification fee, Audio/Video Tape Reproduction fees, Annual Agenda Mailing Subscription fees, Document Print/Copy fees, and Verification of Residency fee are currently set below the full cost of providing the service. Staff have suggested some increases as detailed in Appendix C. As a result, there would be:
 An increase for 9 fees;
 1 fee would decrease;
 1 fee for Convert VHS to DVD would change to actual costs, and;  14 fees would remain as currently set.

13 Comprehensive User Fee Study
Permit Registration Services
The Finance Department maintains the financial records of the City, the Successor Agency and the former Solana Beach Redevelopment Agency. The Finance Department is responsible for managing its budget unit and the budgets for Support Services, Risk Management, Workers Compensation administration, Asset Replacement, Real Property Acquisition, and the OPEB Fund.

The Code Compliance Division works with the residents and business owners to maintain the appearance and safety of the community and protect the quality of life through the diligent application of our City ordinances and land use regulations. Our officers are dedicated to work in partnership with all and to be responsive and solution-oriented. The City strives to promote and protect the welfare of the community to keep Solana Beach a safe, healthy and desirable place to live and work.

Analysis
Willdan individually reviewed the services associated with Permit Registration Services. The review also consisted of an evaluation of existing services in an effort to update the fee schedule.

The services listed under Permit Registration Services consist of mostly flat cost-based fees. The analysis of the cost-based services relied upon a standard unit cost build-up approach, whereby we determined the reasonable cost of each fee occurrence using staff time to recover the direct cost of staff and the pro-rata share of departmental costs, including indirect costs for City central services. Willdan then compared the calculated full cost against the current fee amount to determine, if charged, whether the current fee is recovering the costs associated with the requested service. The analysis found that most of Permit Registration Services fees are currently set below the full cost of providing the service and staff have suggested increases as detailed in Appendix C. As a result, there would be:
 An increase for 31 fees;
 2 new fees for MTC Certified Massage Registrations would be added;  2 fees would decrease, and;
 2 fees would remain as currently set.
14 Comprehensive User Fee Study
Community Development
The Planning Division administers and implements the City’s General Plan, zoning and subdivision regulations and special projects such as the Local Coastal Program/Land Use Plan. This division consists of planners and technical staff who manage the day-to-day development services for current planning projects, provides assistance to customers and also develops strategies for long range planning functions.

Analysis
Willdan individually reviewed the services associated with Community Development Planning Division. The review also consisted of an evaluation of existing services in an effort to update the fee schedule.

The analysis of Planning Division services relied primarily upon a standard unit cost build-up approach, whereby the reasonable cost of each fee occurrence was determined using staff time involved with providing the service to recover the direct cost of staff and the pro-rata share of departmental costs, including indirect costs for City central services. Willdan then compared the calculated full cost against the current fee amount to determine, if charged, whether the current fee is recovering the costs associated with the requested service. The analysis found that most fees are currently set below the full cost of providing the service. Staff have suggested increasing cost recovery of fees to full cost recovery as detailed in Appendix C. As a result, there would be:
 An increase for 39 fees;
 5 new fees to provide for modification to the development review permit processing fees  would be added, and;
 9 fees would remain as currently set.

15 Comprehensive User Fee Study
Building
The Building Division administers and implements the City’s Building, Health and Safety Codes in plan checking and issuance of building permits. Currently the City contracts with EsGil/Safebuilt to provide Building Division services.

Analysis
Willdan individually reviewed the services and programs associated with the Building Division. The review also consisted of an evaluation of existing services in an effort to update the fee schedule.

The analysis of the Building Division services relied primarily upon a standard unit cost build-up approach, whereby the reasonable cost of each fee occurrence was determined using staff time involved with providing the service to recover the direct cost of staff and the pro-rata share of departmental costs, including indirect costs for City central services. Willdan then compared the calculated full cost against the current fee amount to determine, if charged, whether the current fee is recovering the costs associated with the requested service. The analysis found that most flat rate fees are currently set below the full cost of providing the service. Staff have suggested increasing fees to full cost recovery as detailed in Appendix C.

Included in the fees listed under Building are the Building Permit fees which are also provided by this division. For the Building Permit fees, valuation is used as a proxy for measuring the amount of effort needed to provide services on a case-by-case basis. This method is an industry standard widely used by other jurisdictions to evaluate the cost of providing service. It is generally understood that the larger and more complex a project is, the more time and effort that is required to provide code compliance services.

Project valuation also follows that trend, and so by using a combination of either project valuation or historical revenue figures along with a multiplier or cost recovery analysis for historical and anticipated future trends, current cost recovery along with variability in charges due to project type and scale is determined. The result of the cost analysis completed for the Building Permit program found that the program is currently operating at 72% cost recovery based on average annual activity levels from fiscal year 2022 to 2024. It is recommended that the fees be increased to full cost recovery.

As a result, there would be:
 An increase for 23 fees;
 8 fees would decrease, and;
 14 fees would remain as currently set.
16 Comprehensive User Fee Study
Engineering
The Engineering Division includes engineering design, construction, environmental services, traffic engineering, land development reviews and sanitation. Engineering is responsible for all aspects of public and private improvements including streets, public facilities and parks, flood control and street lighting. It also provides engineering support to Council and Staff.

Analysis
Willdan individually reviewed the services associated with the Engineering Division. The review also consisted of an evaluation of existing services in an effort to update the fee schedule.

The analysis of Engineering services relied primarily upon a standard unit cost build-up approach for fees whereby the reasonable cost of each fee occurrence was determined using staff time involved with providing the service to recover the direct cost of staff and the pro-rata share of departmental costs, including indirect costs for City Central Services. Willdan then compared the calculated full cost against the current fee amount to determine, if charged, whether the current fee is recovering the costs associated with the requested service. The analysis found that some fees are currently not in line with the full cost of providing service. It is recommended that the City set Public Works fees adopt fees at full cost recovery for most services as detailed in Appendix C. As a result, there would be:
 An increase for 6 fees;
 16 new fee tiers for Grading Plan Check & Permit/Inspection and Public Improvement Plan Check & Permit/Inspection would be added, and;
 13 fees would remain as currently set.
17 Comprehensive User Fee Study
Public Safety
The Management of the Fire Department is being provided through a Management Services Agreement that consists of a Fire Chief, Deputy Chief, four Battalion Chiefs (one Administrative Battalion Chief and three Shift Battalion Chiefs) and a Fire Marshal. Under direction of the Fire Chief, the Deputy Chief is responsible for overseeing day-to-day operations of the Fire Department and the Battalion Chiefs are responsible for emergency response and emergency management services as well as mid-level management/supervisory responsibilities over the Fire Captains, facilities management, and the training and professional development of all Fire Department personnel. The Fire Marshal is responsible for overseeing, assigning, and tracking fire prevention inspection program, hydrant maintenance program and fire code enforcement and interpretation. The Fire Department operates with a three-shift work schedule to provide 24 hours a day, 7 days a week service from one station. The station houses one fire engine company and one truck company. Each shift consists of two Fire Captains, two Fire Engineers and two Firefighter Paramedics working a 24-hour shift. Each shift is responsible for emergency response, training, fire prevention, station, and equipment maintenance.

The City of Solana Beach Marine Safety Department is responsible for water, beach and bluff safety for the public use of the city’s 1.7 miles of coastline. The Marine Safety Department operates with five full-time employees, complimented with 55 seasonal employees. The department primarily prevents and responds to waterborne emergencies in the City of Solana Beach 24 hours a day, seven days a week, and 365 days a year. Preventing and responding to calls for assistance from beachgoers, swimmers, surfers, and boaters.

The Marine Safety Department also conducts animal rescues, dive rescues and recovery, cliff rescues, and provides emergency medical assistance as needed.

Analysis
Willdan individually reviewed the services associated with Public Safety. The review also consisted of an evaluation of existing services in an effort to update the fee schedule.

The analysis of Public Safety services relied primarily upon a standard unit cost build-up approach for fees, excluding penalties, whereby the reasonable cost of each fee occurrence was determined using staff time involved with providing the service to recover the direct cost of staff and the pro-rata share of departmental costs, including indirect costs for City Central Services. Willdan then compared the calculated full cost against the current fee amount to determine, if charged, whether the current fee is recovering the costs associated with the requested service. The analysis found that most fees are currently set below the full cost of providing service. Staff is recommending that the City set Public Safety fees at the levels detailed in Appendix C. As a result, there would be:
 An increase for 40 fees;
 7 fees would decrease;
 18 new fees primarily relating to State Mandated Inspections, and Fire Alarm Plan Checks & Inspections would be added, and;
 9 fees would remain as currently set.
18 Comprehensive User Fee Study
Community Services
The Community Services division is responsible for providing various service-oriented activities which include the City’s Annual Street Banner program, production of the Weekly Update, management of the public art program, and coordination of City-sponsored community-wide events. In addition, the Community Services Department is directly responsible for providing programs and services to the community, including rental processing of La Colonia Field and Community Center and managing the Fletcher Cove Community Center for City programs, rentals and services; coordination of 30 City-sponsored special events; development of joint use agreements with local school districts and other organizations for facility use and program resources; contract management with the Boys & Girls Club for the City’s After School Enrichment Program; non-City-sponsored special event application administration; and Summer Youth Camps.

Analysis
Willdan individually reviewed the services associated with the Community Services division. The review also consisted of an evaluation of existing services in an effort to update the fee schedule.

The analysis of most Community Services programs encompassed facility rentals and other recreation services. The fee for use of government owned facilities and property can be set discretionally by the City per Proposition 26 to reduce the cost to the public for related facilities costs, and because there is market availability for facility use elsewhere. The cost of acquisition, maintenance, repair, and upgrade to the City and subsequently the community is partially offset by rental or use fee revenue. As such these fees should be set using the knowledge of activity use for the facilities, policy desires of the City, and market factors when desirable. It is generally accepted that many Recreation programs provide a measure of public benefit to the residents and City as a whole. In addition, cities generally want to ensure that their programs and services remain affordable to the community at large, and that the programs remain competitive with surrounding jurisdictions and private businesses. Therefore, full cost recovery is typically not the primary goal of fee setting. A time and cost analysis was performed on the fees in the schedule that could have direct staff involvement identified to determine the direct cost for each. An overall program cost analysis for Community Services was also performed and determined that the division is currently operating at around 29% cost recovery. Staff have suggested reasonable fee adjustments to the fee schedule, and they are detailed in Appendix C. As a result, there would be:
 An increase for 17 fees;
 2 fees for City Purchased Insurance would change to Premium Cost, and;  3 fees would remain as currently set.
19 Comprehensive User Fee Study
Appendix A – Total Allowable Cost to be Recovered
Below are the total allowable costs that may be recovered through user fees; however, only a portion of the total allowable cost is recovered as staff not only works on services related to user fees, but also works on an array of other City functions during the operational hours of the City. The direct overhead percentages below are derived by dividing other operational costs by salaries and benefits. The indirect allocation percentages are provided through the cost allocation plan. The amounts listed below will not reconcile to City budgets as costs that should not be included in overhead for personnel in the application of determining fully burdened hourly rates were excluded. Examples of these costs are capital, debt, monetary transfers, contract costs, and other costs that are charged directly to the service requestor.

City of Solana Beach - User Fee
Overhead Rate Calculations
Department
Total Salaries
& Benefits
Department
Operations &
Administration
Direct
Overhead
%
Indirect
Allocation
%
100: CITY CLERK 479,908 142,860 30% 0%
100: CITY MANAGER 504,174 91,800 18% 0%
100: LEGAL SERVICES 31,766 3,300 10% 0%
100: FINANCE 745,584 434,129 58% 0%
100: HUMAN RESOURCES 575,580 62,000 11% 0%
100: INFORMATION SERVICES 411,988 183,420 45% 0%
100: PLANNING 900,567 136,300 15% 42%
100: BUILDING SERVICES 134,358 14,450 11% 20%
100: CODE ENFORCEMENT 215,505 70,100 33% 37%
100: FIRE DEPARTMENT 5,022,541 658,350 13% 26%
100: ANIMAL CONTROL - - 0% 12%
100: MARINE SAFETY 1,103,210 127,000 12% 40%
100: ENGINEERING 491,219 50,200 10% 46%
100: ENVIRONMENTAL SERVICES 214,056 44,700 21% 39%
100: STREET MAINTENANCE 317,828 96,000 30% 41%
100: PARK MAINTENANCE 122,434 57,500 47% 32%
100: COMMUNITY SERVICES 161,549 23,500 15% 36%
100: GF-RECREATION 198,131 37,310 19% 32%
211: Street Lgt 309,593 55,200 18% 15%
255: Camp 547,318 134,100 25% 31%
509: Sanitation 1,049,455 362,900 35% 0%
20 Comprehensive User Fee Study
Appendix B –Fully Burdened Hourly Rates
Below are fully burdened hourly rates (FBHR) of staff positions that provide for the services detailed in Appendix C. The FBHRs were used to determine the full cost of each service. They include the salary and benefit costs for each position as well as all applicable overhead amounts for each position.

City of Solana Beach - User Fee
Fully Burdened Hourly Rate Calculation
Department Title
Fully Burdened
Hourly Rate
Blended Rates
Planner Blended Rate $193.35
Planning Intake Blended Rate $139.00
Code Officer Blended Rate $162.39
Position Rates
100: ANIMAL CONTROL Animal - Principal Management Analyst $161.80 100: BUILDING SERVICES Bldg - Jr. Planner $102.22
100: BUILDING SERVICES Bldg - Permit Technician $102.22 100: CITY CLERK Clerk - City Clerk $280.71
100: CITY CLERK Clerk - Deputy City Clk $154.51
100: CITY CLERK Clerk - Management Analyst $144.04
100: CITY CLERK Clerk-Management Assistant $100.86
100: CITY MANAGER CM - City Manager $295.49
100: CITY MANAGER CM - Executive Assistant $131.21
100: CITY MANAGER CM - Principal Management Analyst $170.81 100: CITY MANAGER CM-Admin. Asst. II/III $91.87
100: CITY MANAGER CM-Assistant City Manager $275.80
100: CODE ENFORCEMENT Code - Code Compliance Officer $152.48 100: CODE ENFORCEMENT Code - Sr. Code Comp. Officer $172.30 100: CITY COUNCIL Council - Executive Assistant $134.29 100: COMMUNITY SERVICES CS - Assistant City Manager $364.04 100: COMMUNITY SERVICES CS - Management Analyst $173.19 100: ENGINEERING Eng - Assistant Civil Engineer $173.36 100: ENGINEERING Eng - Associate Civil Engineer $207.51 100: ENGINEERING Eng - Associate Management Analyst $148.62 100: ENGINEERING Eng - City Engineer / Director Public Works $347.21 100: ENGINEERING Eng - Principal Civil Engineer $254.31 100: ENGINEERING Eng - Senior Civil Engineer $210.21
100: ENGINEERING Eng - Senior Engineering Technician $148.62 100: ENVIRONMENTAL SERVICES Environ - Assistant City Manager $390.75 100: ENVIRONMENTAL SERVICES Environ - Assistant Civil Engineer $216.51 100: ENVIRONMENTAL SERVICES Environ - Maint. Worker I $103.52 21 Comprehensive User Fee Study
City of Solana Beach - User Fee
Fully Burdened Hourly Rate Calculation
Department Title
Fully Burdened
Hourly Rate
Position Rates
100: ENVIRONMENTAL SERVICES Environ - P/W Operations Manager $242.01 100: ENVIRONMENTAL SERVICES Environ - Principal Civil Engineer $265.35 100: ENVIRONMENTAL SERVICES Environ - Principal Management Analyst $242.01 100: ENVIRONMENTAL SERVICES Environ - Public Works Supervisor $185.90 100: ENVIRONMENTAL SERVICES Environ - Sr. Code Comp. Officer $159.25 100: FINANCE Fin - Accountant $149.99
100: FINANCE Fin - Admin. Asst. II/III $122.98
100: FINANCE Fin - Fiscal Spec I $124.16
100: FINANCE Fin - Risk Manager $228.64
100: FINANCE Fin - Sr Accountant $207.22
100: FINANCE Fin-Finance Director/Treasurer $342.27
100: FIRE DEPARTMENT Fire - Admin. Asst. II/III $111.02 100: FIRE DEPARTMENT Fire - Deputy Fire Chief $280.92
100: FIRE DEPARTMENT Fire - Fire Captain $174.73
100: FIRE DEPARTMENT Fire - Fire Engineer + Paramedic $158.21 100: FIRE DEPARTMENT Fire - Fire Prevention Specialist $139.57 100: FIRE DEPARTMENT Fire - Firefighter + Paramedic $146.15 100: HUMAN RESOURCES HR - Assistant City Manager $258.45 100: HUMAN RESOURCES HR - Executive Assistant $122.95
100: HUMAN RESOURCES HR - Human Resources Director $239.62 100: HUMAN RESOURCES HR - Principal Human Resources Analyst $160.07 100: HUMAN RESOURCES HR - Risk Manager $160.07
100: HUMAN RESOURCES HR-Principal Management Analyst $160.07 100: INFORMATION SERVICES IS - Help Desk Management Assistant $112.32 100: INFORMATION SERVICES IS - IT Director $312.62
100: INFORMATION SERVICES IS - Network System Engineer $189.27 100: INFORMATION SERVICES IS - Principal Management Analyst $208.84 100: LEGAL SERVICES Legal - Deputy City Clk $131.44
100: MARINE SAFETY Marine - Admin. Asst. II/III $121.61 100: MARINE SAFETY Marine - M/S Lieutenant $156.82
100: MARINE SAFETY Marine - M/S Sergeant $136.32
100: MARINE SAFETY Marine - M/S Captain $272.73
100: PARK MAINTENANCE Park Maint - Assistant Civil Engineer $251.62 100: PARK MAINTENANCE Park Maint - Maint. Worker I $120.31 100: PARK MAINTENANCE Park Maint - P/W Operations Manager $281.25 100: PARK MAINTENANCE Park Maint - Public Works Supervisor $216.04 100: PLANNING Planning - Comm Dev. Director $353.02
100: PLANNING Planning - Jr. Planner $125.58
100: PLANNING Planning - Principal Management Analyst $235.82 22 Comprehensive User Fee Study
City of Solana Beach - User Fee
Fully Burdened Hourly Rate Calculation
Department Title
Fully Burdened
Hourly Rate
Position Rates
100: PLANNING Planning - Principal Planner $235.82
100: PLANNING Planning-Assistant Planner $152.43
100: PLANNING Planning-Associate Planner $171.43
100: PLANNING Planning-Senior Planner $213.72
100: GF-RECREATION Recreation - Assistant City Manager $364.81 100: GF-RECREATION Recreation - Rec. Manager $225.94
100: STREET MAINTENANCE Street Maint - Assistant Civil Engineer $237.99 100: STREET MAINTENANCE Street Maint - Associate Management Analyst $170.45 100: STREET MAINTENANCE Street Maint - City Engineer / Director Public Works $398.22 100: STREET MAINTENANCE Street Maint - Maint. Worker I $113.79 100: STREET MAINTENANCE Street Maint - Maint. Worker II $113.79 100: STREET MAINTENANCE Street Maint - P/W Operations Manager $266.02 100: STREET MAINTENANCE Street Maint - Public Works Supervisor $204.34 211: Street Lgt 211: Street Lgt - Assistant Civil Engineer $174.59 211: Street Lgt 211: Street Lgt - Associate Management Analyst $125.04 211: Street Lgt 211: Street Lgt - City Engineer / Director Public Works $292.14 211: Street Lgt 211: Street Lgt - City Manager $337.59
211: Street Lgt 211: Street Lgt - P/W Operations Manager $195.15 211: Street Lgt 211: Street Lgt - Principal Civil Engineer $213.97 211: Street Lgt 211: Street Lgt - Public Works Supervisor $149.90 255: Camp 255: Camp - M/S Lieutenant $163.71
255: Camp 255: Camp - M/S Sergeant $142.31
255: Camp 255: Camp - M/S Captain $284.72
509: Sanitation 509: Sanitation - Accountant $127.58
509: Sanitation 509: Sanitation - Assistant City Manager $313.99 509: Sanitation 509: Sanitation - Assistant Civil Engineer $173.98 509: Sanitation 509: Sanitation - Associate Management Analyst $124.61 509: Sanitation 509: Sanitation - City Clerk $291.12
509: Sanitation 509: Sanitation - City Engineer / Director Public Works $291.12 509: Sanitation 509: Sanitation - City Manager $336.41
509: Sanitation 509: Sanitation - Comm Dev. Director $291.12 509: Sanitation 509: Sanitation - Finance Director/Treasurer $291.12 509: Sanitation 509: Sanitation - Fiscal Spec I $105.60 509: Sanitation 509: Sanitation - Maint. Worker I $83.18 509: Sanitation 509: Sanitation - P/W Operations Manager $194.47 509: Sanitation 509: Sanitation - Principal Civil Engineer $213.22 509: Sanitation 509: Sanitation - Public Works Supervisor $149.38 509: Sanitation 509: Sanitation - Risk Manager $194.47
23 Comprehensive User Fee Study
Appendix C – Cost Recovery Analysis
The following tables provide the results of the analysis, resulting full cost recovery amount, and recommended fees. For fees, services, and penalties in which the full cost, existing fee, and suggested fee is listed as “NA”, the amount or percentage was not calculable. This is most common when either the current or the suggested fee includes a variable component that is not comparable on a one-to-one basis, a full cost was not calculated (for penalties, fines, market-based fees, or items not included in the study), or when there is not a current fee amount to compare against.

ADMINISTRATIVE SERVICES
#
Service Code # Dept. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ Fee Δ % 1 S-640 Finance Administrative Citation
Fines shall be assessed in the amounts specified by resolution of the city council, or, where no amount is specified: SBMC 1.18.030 2 Finance First violation A fine not exceeding $100.00 (Ord. 283 § 2, 2002) NA NA A fine not exceeding $100.00 $0 0%3 Finance Second violation of the same ordinance, term, or condition within one year from the date of the first violation A fine not exceeding $200.00 (Ord. 283 § 2, 2002) NA NA A fine not exceeding $200.00 $0 0% 4 Finance
Each additional violation of the same ordinance, term or condition within one year from the date of the first violation A fine not exceeding $500.00 (Ord. 283 § 2, 2002) NA NA A fine not exceeding $500.00 $0 0% 5 S-645 Finance STVR - Permit Violation Penalties SBMC 4.47.0706 Finance First violation in 12-month period $500.00 NA NA $500.00 $0 0%7 Finance Second violation in 12-month period $1,000.00 NA NA $1,000.00 $0 0%8 Finance Third violation in 12-month period Permit revocation and hearing pursuant to SBMC 4.04.110 NA NA Permit revocation and hearing pursuant to SBMC 4.04.110 $0 0%9 S-711 City Clerk Notary Public Service $15.00 per signature limited to $15 by state law NA NA $15.00 $0 0% 10 S-712 City Clerk Document Certification $43.00 per item $140.36 0% $140.00 $97 226%11 S-715 City Clerk Audio/Video Tape Reproduction12 City Clerk Audio CD $25.00 per item $53.50 0% $53.50 $29 114%13 City Clerk DVD $25.00 per item $40.63 0% $40.63 $16 63%14 City Clerk Convert VHS to DVD $45.00 per item NA NA Actual Costs NA 0%15 City Clerk Convert Audio Cassette to CD/MP4 Actual Costs NA NA Actual Costs $0 0%16 S-716 City Clerk Annual Agenda Mailing Subscription $423.00 per subscriber per year $576.80 0% $577.00 $154 36%17 S-717 City Clerk Annual Agenda Packet Mailing Subscription $1,716.00 per subscriber per year $2,865.07 0% $2,865.00 $1,149 67%18 S-718 City Clerk Special Notice Subscription $58.00 per subscriber per year $100.86 0% $101.00 $43 74%19 S-719 City Clerk Document Print/Copy20 City Clerk All copies $0.21 per page for every page after 10 pages No charge for first 10 pages $0.21 0% $0.21 $0 0% 21 City Clerk Document Imaging $0.15 per page for every page after 10 pages No charge for first 10 pages $0.15 0% $0.15 $0 0%22 City Clerk Data Copy $8.00 per device $53.50 0% $53.50 $46 569%23 City Clerk Maps/Blueprints Actual Costs NA NA Actual Costs $0 0%24 S-720 City Clerk Candidate Filing Fee $25.00 per initiative Set by the State NA NA $25.00 $0 0%25 S-721 City Clerk Initiative Processing $200.00 per initiative Set by the State NA NA $200.00 $0 0%26 S-722 City Clerk Verification of Residency $19.00 per request $140.36 0% $140.00 $121 637%27 S-740 Finance NSF Check $58.00 per incident Set by the State NA NA $25 first check, $35 each subsequent check
-$33 -57%
28 S-750 Finance Credit Card Convenience Fee set by City's Third-Party Credit Card Processor NA NA set by City's Third- Party Credit Card Processor
$0 0%
29 S-760 Finance Technology Surcharge 1%
Charge % of all plan check and permit fees and entitlements (except impact fees)

7.7% 35% 5% 4% 400%
24 PERMIT REGISTRATION SERVICES
#
Service Code # Dept. Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ Fee Δ % 1 S-610 Finance Short Term Vacation Rental Permit2 Finance New $112.00 per permit $253.39 0% $253.00 $141 126% 3 Finance Renewal $59.00 per permit $142.02 0% $142.00 $83 141% 4 S-620 Finance New/Changed Business Certificate5 Finance Home Base $112.00 per application $124.51 0% $124.00 $12 11% 6 Finance Located Outside the City $112.00 per application $93.12 0% $93.00 -$19 -17% 7 Finance Business Located Within the City $249.00 per application S-460 for Business located within the City $309.37 0% $309.00 $60 24%8 S-626 Finance Business Certificate Renewal9 Finance Home Base $51.00 per application $62.08 0% $62.00 $11 22% 10 Finance Located Outside the City $51.00 per application $62.08 0% $62.00 $11 22%11 Finance Business Located Within the City $51.00 per application S-460 for Business located within the City $93.12 0% $93.00 $42 82%12 S-628 Finance SB 1186 $4.00 per application/renewal SB 1186 Fee to be paid by all business certificate, regulatory, and STVR applicants NA NA $4.00 $0 0%13 S-629 Finance STVR Permit Duplicate $24.00 per duplicate $43.08 0% $43.00 $19 79%14 S-630 Community Dev (Codes) Amusement Permit15 Community Dev (Codes) New $264.00 per permit, plus DOJ and other State fees $459.39 0% $459.00 $195 74%16 Community Dev (Codes) plus, per device $67.00 per device $17.23 1% $17.00 -$50 -75%17 Community Dev (Codes) Renewal $149.00 per permit, plus DOJ and other State fees $459.39 0% $459.00 $310 208%18 S-631 Community Dev (Codes) Dance Permit19 Community Dev (Codes) New $264.00 per permit, plus DOJ and other State fees $459.39 0% $459.00 $195 74%20 Community Dev (Codes) Renewal $149.00 per permit, plus DOJ and other State fees $287.09 0% $287.00 $138 93%21 S-632 Community Dev (Codes) Entertainment Permit22 Community Dev (Codes) New $264.00 per permit, plus DOJ and other State fees $459.39 0% $459.00 $195 74%23 Community Dev (Codes) Renewal $149.00 per permit, plus DOJ and other State fees $287.09 0% $287.00 $138 93%24 S-633 Community Dev (Codes) Firearms Permit25 Community Dev (Codes) New $264.00 per permit, plus DOJ and other State fees $459.39 0% $459.00 $195 74%26 Community Dev (Codes) Renewal $149.00 per permit, plus DOJ and other State fees $287.09 0% $287.00 $138 93%27 S-634 Community Dev (Codes) Massage Establishment Permit28 Community Dev (Codes) New $264.00 per permit, plus DOJ and other State fees $459.39 0% $459.00 $195 74%29 Community Dev (Codes) Renewal $149.00 per permit, plus DOJ and other State fees $287.09 0% $287.00 $138 93%30 S-635 Community Dev (Codes) Secondhand Dealer Permit31 Community Dev (Codes) New $264.00 per permit, plus DOJ and other State fees $459.39 0% $459.00 $195 74%32 Community Dev (Codes) Renewal $149.00 per permit, plus DOJ and other State fees $287.09 0% $287.00 $138 93%33 S-636 Community Dev (Codes) Solicitors Permit34 Community Dev (Codes) New $264.00 per permit, plus DOJ and other State fees $459.39 0% $459.00 $195 74%35 Community Dev (Codes) Plus: Each additional solicitor $114.00 each $170.19 0% $170.00 $56 49% 25 PERMIT REGISTRATION SERVICES
#
Service Code # Dept. Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ Fee Δ % 36 Community Dev (Codes) Renewal $149.00 per permit, plus DOJ and other State fees $330.16 0% $330.00 $181 121%37 S-637 Community Dev (Codes) Taxi Business Permit38 Community Dev (Codes) New $383.00 per permit, plus $ for each cab plus DOJ and other State fees $545.54 0% $545.00 $162 42%
39 Community Dev (Codes) Plus: Each cab $24.00 each $287.09 90% $30.00 $6 25%40 Community Dev (Codes) Renewal $205.00 per permit, plus DOJ and other State fees $330.16 0% $330.00 $125 61%41 Community Dev (Codes) Plus: Each cab $24.00 each $330.16 91% $30.00 $6 25%42 S-638 Community Dev (Codes) Tobacco Sales Permit43 Community Dev (Codes) New $264.00 per permit $459.39 0% $459.00 $195 74% 44 Community Dev (Codes) Renewal $149.00 per permit plus DOJ and other State fees $287.09 0% $287.00 $138 93%45 Community Dev (Codes) Late Fee Renewal fee + 10% NA NA Civil Fine every 15 calendar days, per SBMC Ch 1.18
$0 0%
46 S-639 Community Dev (Codes) Newsstand/News Rack Permit $36.00 per permit $345.66 0% $345.00 $309 858%47 Community Dev (Codes) CA MTC Certified Massage Tech/Business Registration New $437.72 0% $437.00 NA NA48 Community Dev (Codes) CA MTC Certified Massage Tech/Business Registration Renewal New $308.50 0% $308.00 NA NA49 S-660 Engineering Golf Cart Permit $10.00 per permit $66.50 1% $66.00 $56 560% 26 COMMUNITY DEVELOPMENT SERVICES
#
Service Code # Dept. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ Fee Δ % 1 Community Dev Conditional Use Permit - Processing2 S-001 Community Dev All CUPs $9,559.00 per application $12,486.24 0% $12,486.00 $2,927 31% 3 S-001A Community Dev Bluff Retention Device CUPs & Wireless Communication Facility CUPs Cost + 15% Bluff retention device CUPs will include deposit based on estimated costs for third-party geotechnical review, consultant review, and legal services. Optional: expediting fee and CEQA document preparation fee, upon request.

NA NA Cost + 15% $0 0%
4 S-002 Community Dev Conditional Use Permit - Modification $3,361.00 Per application $4,341.88 0% $4,341.00 $980 29% 5 S-003 Community Dev Conditional Use Permit - Time Extension $2,506.00 Per application $3,215.47 0% $3,215.00 $709 28% 6 Community Dev Community Development Directors Use Permit7 S-004 Community Dev New Application $3,116.00 Per application $3,293.60 0% $3,293.00 $177 6% 8 S-004A Community Dev Wireless $2,870.00 Per application $3,042.44 0% $3,042.00 $172 6% 9 S-004B Community Dev Wireless Communications Facility requires additional deposit for third party reviews NA NA requires additional deposit for third party reviews $0 0% 10 S-005 Community Dev Community Development Dir. Use Permit - Revision $1,585.00 Per application $1,710.67 0% $1,710.00 $125 8% 11 S-006 Community Dev Community Development Dir. Use Permit - Time Extension $1,341.00 Per application $1,459.51 0% $1,459.00 $118 9%12 S-008 Community Dev Minor Exception - Review Process $1,280.00 Per application $1,432.51 0% $1,432.00 $152 12%13 S-011 Community Dev Temporary Use Permit - Processing $1,639.00 Per application $1,895.48 0% $1,895.00 $256 16% 14 S-012 Community Dev Temporary Use Permit - Time Extension $801.00 Per application $947.74 0% $947.00 $146 18%15 S-013 Community Dev Zoning Letter $171.00 Per letter $225.28 0% $225.00 $54 32% 16 S-014 Community Dev Variance - Processing $7,235.00 Per application $9,333.80 0% $9,333.00 $2,098 29% 17 S-016 Community Dev Pre-application review $3,052.00 Per application 50% of the fee to be credited against future fees if the project actually goes forward. $3,787.69 0% $3,787.00 $735 24%18 S-017 Community Dev Appeal to the City Council19 Community Dev Resident $1,805.00 Per appeal $5,455.85 60% $2,182.00 $377 21% 20 Community Dev Others $4,514.00 Per appeal $5,455.85 0% $5,455.00 $941 21%21 S-018 Community Dev General Plan Amendment $10,000.00 Deposit Or a deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any outside costs as determined by Service Code S-350. City staff will track time related to the project so that 100% of costs are recovered.

NA NA $10,000.00 $0 0%
22 S-019 Community Dev Rezoning Review/Specific Plan $10,000.00 Deposit Or a deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any outside costs as determined by Service Code S-350. City staff will track time related to the project so that 100% of costs are recovered.

NA NA $10,000.00 $0 0%
23 S-020 Community Dev Zoning Text Amendment $10,000.00 Deposit Or a deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any outside costs as determined by Service Code S-350. City staff will track time related to the project so that 100% of costs are recovered.

NA NA $10,000.00 $0 0%
24 S-021 Community Dev Development Review Permit - Processing25 Community Dev Residential A - Single-Family Resident $5,630.00 Per application $14,618.92 50% $7,309.00 $1,679 30%26 Community Dev Residential B - Single-Family Non-Resident $11,275.00 Per application $14,618.92 0% $14,618.00 $3,343 30%27 Community Dev Residential C - 2-4 Units New Per application $21,522.15 0% $21,522.00 NA NA28 Community Dev Residential D - >4 Units New Per application $24,288.51 0% $24,288.00 NA NA29 Community Dev Non-Residential/Mixed Use A - Exterior Improvements/Remodel $18,893.00 Per application $19,020.98 0% $19,020.00 $127 1%30 Community Dev Non-Residential/Mixed Use B - Additions <500sf New Per application $24,232.67 0% $24,232.00 NA NA31 Community Dev Non-Residential/Mixed Use C - Additions >500sf/New Commercial New Per application $28,125.45 0% $28,125.00 NA NA32 S-021A Community Dev Or a deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any outside costs as determined by Service Code S-350 27 COMMUNITY DEVELOPMENT SERVICES
#
Service Code # Dept. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ Fee Δ % 33 S-022 Community Dev Development Review Permit - Modification $3,498.00 Per application $4,511.97 0% $4,511.00 $1,013 29% 34 S-022A Community Dev Administrative Development Review Permit Modification New $3,153.17 0% $3,153.00 NA NA 35 S-023 Community Dev Development Review Permit - Time Extension $2,285.00 Per application $3,007.96 0% $3,007.00 $722 32% 36 S-024 Community Dev Major Subdivision - Tentative Map $15,454.00 Per application $19,942.29 0% $19,942.00 $4,488 29%37 S-025 Community Dev Major Subdivision - Final Map $5,359.00 Per application $6,477.77 0% $6,477.00 $1,118 21% 38 S-026 Community Dev Major Subdivision - Amend. Of Condition $4,514.00 Per application $5,750.52 0% $5,750.00 $1,236 27% 39 S-027 Community Dev Major Subdivision - Time Extension $4,173.00 Per application $5,279.80 0% $5,279.00 $1,106 27%40 S-028 Community Dev Minor Subdivision - Tentative Map $11,839.00 Per application $15,290.44 0% $15,290.00 $3,451 29%41 S-029 Community Dev Minor Subdivision - Parcel Map $4,343.00 Per application $5,393.44 0% $5,393.00 $1,050 24% 42 S-030 Community Dev Minor Subdivision - Amend. Of Condition $3,556.00 Per application $4,502.91 0% $4,502.00 $946 27% 43 S-031 Community Dev Minor Subdivision - Time Extension $3,439.00 Per application $4,354.29 0% $4,354.00 $915 27%44 S-032 Community Dev Environmental Documentation Deposit for third-party
review at Cost + 15% Admin
Fee
Per application (see Service Code S-350) NA NA
Deposit for third-party review at Cost + 15% Admin Fee
$0 0%
45 S-035 Community Dev Environmental Impact Report
Deposit for third-party
review at Cost + 15% Admin
Fee
Per application (see Service Code S-350) NA NA
Deposit for third-party review at Cost + 15% Admin Fee
$0 0%
46 S-036 Community Dev Structure Develop. Permit - Processing $3,963.00 Per application $5,109.84 0% $5,109.00 $1,146 29% 47 S-037 Community Dev Structure Develop. Permit Waiver/Time Extension $607.00 Per application This fee will not be charged in conjunction with a Development Review Permit-Time Extension (S023) $666.96 0% $666.00 $59 10% 48 S-037A Community Dev Structure Develop. Permit Waiver/Time Extension (with S-023) $0.00 Per application This fee will not be charged in conjunction with a Development Review Permit-Time Extension (S023) NA NA $0.00 $0 0% 49 S-040 Community Dev View Assessment - Claimant $600.00 Per application Full refund of application fee will be made if parties settle 2 weeks before a scheduled VAC hearing and a refund of $300 if parties settle within the 2 week period before a VAC hearing $5,544.79
50 S-040 Community Dev View Assessment - Applicant $600.00 Per application Full refund of application fee will be made if parties settle 2 weeks before a scheduled VAC hearing and a refund of $300 if parties settle within the 2 week period before a VAC hearing $5,544.79
51 S-041 Community Dev View Assessment Committee (VAC) - Appeal to City Council $1,937.00 Per application $2,410.75 0% $2,410.00 $473 24% 52 S-050 Community Dev Standard Sign Permit - Processing $364.00 Per application $376.74 0% $376.00 $12 3% 53 S-051 Community Dev Comprehensive Sign Plan - Review Process $1,038.00 Per application plus 100% fine of original sign permit if the sign was built without a permit. $1,106.49 0% $1,106.00 $68 7%54 S-052 Community Dev Comprehensive Sign Plan - Amendment $546.00 Per application $604.17 0% $604.00 $58 11% 55 S-053 Community Dev Temporary Sign/Banner $122.00 Per application $125.58 0% $125.00 $3 2% 56 S-060 Community Dev Landscape Plan Review/Inspection Deposit for third-party
review at Cost + 15% Admin
Fee
Per application (see Service Code S-350) NA NA
Deposit for third-party review at Cost + 15% Admin Fee
$0 0%
57 S-065 Community Dev Street Address Change $270.00
for first five addresses plus $59 for each additional five addresses $331.42 0% $331.00 $61 23%
58 S-067 Community Dev Planning Public Noticing $590.00 per notice plus actual mailing and newspaper costs
If a project has more than one notice, this fee would be charged for each notice. $1,110.45 0% $1,110.00 $520 88% 59 S-036D Community Dev Multi-permit discount of 15%60 S-036A Community Dev Structure Develop. Permit - Processing (with S-021) A multi-permit discount of 15% is available for each additional Planning Department permit service filed on the same project at the same time as the first permit service. For example, if a Conditional Use Permit (CUP) ($9,099) is filed simultaneously with a Development Review Permit (DRP) ($5,359), the required fee would be $9,099 plus $5,359 minus 15% of $5,359, or $4,555 for the DRP (the discount is applied to the lower cost fee).If in conjunction with a Development Review Permit (S-021), the S-036 fee will instead be 30% of the total S-036 fee To be determined by CouncilTo be determined by Council
28 BUILDING SERVICES
#
Service Code # Dept. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ Fee Δ % 1 S-210 TO S265 Community Dev. Building Plan - Plan Check & Permit/Inspection See attached valuation tables Attachments A & B NA NA See attached valuation tables Attachments A & B $0 0% 2 S-270 Community Dev. CalGreen Building Plan Check3 Community Dev. 0-50,000 SF 3% of Building Permit Plan Check NA NA 3% of Building Permit Plan Check $0 0% 4 Community Dev. Above 50,001 1% of Building Permit Plan Check NA NA 1% of Building Permit Plan Check $0 0% 5 S-272 Community Dev. CalGreen Building Permit/Inspection6 Community Dev. 0-50,000 SF 3% of Building Inspection Fee NA NA 3% of Building Inspection Fee $0 0%7 Community Dev. Above 50,001 1% of Building Inspection Fee NA NA 1% of Building Inspection Fee $0 0%8 S-275 Community Dev. Commercial Photovoltaic Plan Check Based on the Project Valuation 9 Community Dev. $0-$100,000 $383.00 $373.71 0% $373.00 -$10 -3% 10 Community Dev. $100,000-$500,000 $477.00 $373.71 0% $373.00 -$104 -22%11 Community Dev. $500,000-$1,000,000 $514.00 $523.63 0% $523.00 $9 2%12 Community Dev. Above $1,000,000 $618.00 $523.63 0% $523.00 -$95 -15%13 S-277 Community Dev. Commercial Photovoltaic Permit/Inspection Based on the Project Valuation14 Community Dev. $0-$100,000 $383.00 $373.71 0% $373.00 -$10 -3%15 Community Dev. $100,000-$500,000 $477.00 $373.71 0% $373.00 -$104 -22%16 Community Dev. $500,000-$1,000,000 $514.00 $523.63 0% $523.00 $9 2%17 Community Dev. Above $1,000,000 $618.00 $523.63 0% $523.00 -$95 -15%18 S-278 001-4715 Single Family Residental Solar Plan Check $38.00 Per plan check (25% of Individual Electrical Permit Fee-Attachment B) $189.04 77% $43.00 $5 13% 19 S-279 001-4320 Single Family Residental Solar Permit/Inspection $204.00 Per permit/inspection (Individual Electrical Permit Fee- Attachment B) $163.48 -5% $172.00 -$32 -16%20 S-280 Community Dev. Building Permit Extension Review $254.00 Per application $102.22 0% $102.00 -$152 -60% 21 S-285 Community Dev. Violation of Building Permit
equal to total of building permit fee that
was required (in addition to building
permit fee)
Per violation NA NA
equal to total of building permit fee that was required (in addition to building permit fee) $0 0%
22 S-290 Community Dev. SMIP Fee per Section 2705 of the Public Resources Code NA NA per Section 2705 of the Public Resources Code $0 0% 23 S-291 Community Dev. State Building Standards Fee per HSC Section 18931.6 NA NA per HSC Section 18931.6 $0 0% 24 Attachment B - Building Permit Fees
25 S-210 Community Dev. TOTAL VALUATION * BASE BUILDING PERMIT FEE *26 Community Dev. $1.00 to $500.00 $30.00 $41.68 2% $41.00 $11 37% 27 Community Dev. $500.01 to $2,000.00 $30.00 for the first $500.00 $41.68 2% $41.00 $11 37% 28 Community Dev. For each additional $100, or fraction thereof, to and including $2,000.00 $3.86 $5.36 0% $5.36 $2 39% 29 Community Dev. $2,000.01 to $25,000.00 $87.69 for the first $2,000.00 $121.83 1% $121.00 $33 38% 30 Community Dev. For each additional $1,000, or fraction thereof, to and including $25,000.00 $17.76 $24.68 0% $24.68 $7 39% 31 Community Dev. $25,000.01 to $50,000.00 $496.24 for the first $25,000.00 $689.46 0% $689.00 $193 39% 32 Community Dev. For each additional $1,000, or fraction thereof, to and including $50,000.00 $12.83 $17.83 0% $17.83 $5 39% 33 Community Dev. $50,000.01 to $100,000.00 $817.07 for the first $50,000.00 $1,135.21 0% $1,135.00 $318 39%34 Community Dev. For each additional $1,000, or fraction thereof, to and including $100,000.00 $8.89 $12.35 0% $12.35 $3 39% 35 Community Dev. $100,000.01 to $500,000.00 $1,261.41 for the first $100,000.00 plus $1,752.57 0% $1,752.00 $491 39% 36 Community Dev. For each additional $1,000, or fraction thereof, to and including $500,000.00 $7.11 $9.88 0% $9.88 $3 39% 37 Community Dev. $500,000.01 to $1,000,000.00 $4,106.81 for the first $500,000.00 plus $5,705.89 0% $5,705.00 $1,598 39% 29 BUILDING SERVICES
#
Service Code # Dept. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ Fee Δ % 38 Community Dev. For each additional $1,000, or fraction thereof, to and including $1,000,000.00 $6.03 $8.38 0% $8.38 $2 39% 39 Community Dev. $1,000,000.01+ $7,120.31 for the first $1,000,000.00 $9,892.76 0% $9,892.00 $2,772 39%40 Community Dev. For each additional $1,000, or fraction thereof $4.00 $5.56 0% $5.56 $2 39%41 Associated Fees 42 S-212 Community Dev. Permit Issuance Fee $50.00 $51.11 0% $51.00 $1 2% 43 S-220 Community Dev. Individual Plumbing Permit $153.00 $172.00 0% $172.00 $19 12% 44 S-230 Community Dev. Individual Electrical Permit $153.00 $172.00 0% $172.00 $19 12% 45 S-240 Community Dev. Individual Mechanical Permit $153.00 $172.00 0% $172.00 $19 12% 46 S-233 Community Dev. Water Heater Permit $77.00 $103.04 0% $103.00 $26 34%47 In Combination with Building Permit 48 S-222 Community Dev. Plumbing Permit 7% of Base Permit Fee NA NA 7% of Base Permit Fee $0 0% 49 S-232 Community Dev. Electrical Permit 7% of Base Permit Fee NA NA 7% of Base Permit Fee $0 0% 50 S-242 Community Dev. Mechanical Permit 7% of Base Permit Fee NA NA 7% of Base Permit Fee $0 0% 51 S-250 Community Dev. Energy Surcharge Fee 15% of Base Permit Fee NA NA 15% of Base Permit Fee $0 0% 52 S-252 Community Dev. Disabled Access Surcharge Fee 10% of Base Permit Fee (Disabled Access fee applies to Commercial, Industrial, Assembly, Educational and Multi-Family type projects as required by State Building Code) NA NA 10% of Base Permit Fee $0 0%
53 S-255 Community Dev. Plan Check Fee 85% of Building Permit Fee NA NA 85% of Building Permit Fee $0 0% 54 Community Dev.

NOTES:

S-260S-262S-265
*
Upon initial submittal to the City, permit fees based on valuations will be calculated using the most recent ICC Building Valuations Table. This will be the minimum fee charged for the permit. If upon a subsequent submittal, the valuation decreases, no refund based on the decreased valuation will be provided to the applicant. If the valuation increases, additional permit fees will be calculated based on the difference between the valuation used to calculate the minimum fee and the increased valuation. (Residential sub-division or tract development projects may have production units that are duplicates of the model units reduced to 30% of the permit fee)A Building Permit shall include only a single issuance fee if the permit has a combination of activities (i.e.: Building/Plumbing/Electrical/Mechanical.)Projects requiring plan revisions or having a new scope of work shall be charged a fee determined by using the current preferred hourly rate as established by EsGil Corporation.Expedited processing is only available for unusual circumstances as deemed appropriate by City Staff. Charges for expedited services shall be determined by using an hourly rate of two times the current preferred hourly rate as established by EsGil Corporation.Projects requiring special inspections or additional re-inspections shall be charged a fee determined by using the current preferred hourly rate as established by EsGil Corporation. 30 ENGINEERING SERVICES
#
Service Code # Dept. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ Fee Δ % 1 S-100/S100A Engineering Lot Line Adj./Cert. of Compliance - Review $2,025.00 per application Or a deposit determined by staff with charges at the fully allocated hourly rate for all personnel involved plus any outside costs as determined by S-350. $2,211.55 0% $2,211.00 $186 9%2 S-110 Grading Plan Check Construction Valuation** Per Resolution 2001-85, the most current City of San Diego Cost Estimate Unit Price List is used for determining valuation 3 Engineering $0-$40,000 $2,270.60 $1,462.95 0% $1,462.00 -$809 -36%4 Engineering $40,001-$100,000 $4,423.40 $2,538.58 0% $2,538.00 -$1,885 -43%5 Engineering $100,001-$200,000 $5,525.00 $3,909.88 0% $3,909.00 -$1,616 -29%6 Engineering $200,001+ $5,525 + $11.02 per $100 $6,232.06 0% $6,232.00 $707 13%7 S-110A Engineering8 S-110B Engineering Bluff Projects Deposit determined by staff with
charges at the fully allocated hourly
rate for all personnel involved plus
any outside costs as determined by S350.

NA NA
Deposit determined by staff with charges at the fully allocated hourly rate for all personnel involved plus any outside costs as determined by S-350. $0 0%
9 S-111 Grading Permit/Inspection
Construction Valuation** Per Resolution 2001-85, the most current City of San Diego Cost Estimate Unit Price List is used for determining valuation 10 Engineering $0-$40,000 $1,433.00 $1,462.95 0% $1,462.00 $29 2% 11 Engineering $40,001-$100,000 $2,315.40 $2,538.58 0% $2,538.00 $223 10%12 Engineering $100,001-$200,000 $3,417.00 $3,909.88 0% $3,909.00 $492 14%13 Engineering $200,001+ $3,417 + $10.76 per $100 $6,232.06 0% $6,232.00 $2,815 82%14 S-111A Engineering15 S-111B Engineering Bluff Projects Deposit determined by staff with
charges at the fully allocated hourly
rate for all personnel involved plus
any outside costs as determined by S350.

NA NA
Deposit determined by staff with charges at the fully allocated hourly rate for all personnel involved plus any outside costs as determined by S-350. $0 0%
16 S-112 Engineering Grading Deposits
Based on an Engineer’s Estimate of the
work performed under the permit. Per
Resolution 2001-85, the City of San
Diego Cost Estimate Unit Price List is
used for determining security amount
Per permit/inspection NA NA
Based on an Engineer’s Estimate of the work performed under the permit. Per Resolution 2001-85, the City of San Diego Cost Estimate Unit Price List is used for determining security amount $0 0%
17 S-115 Public Improvement Plan Check
Construction Valuation** Per Resolution 2001-85, the most current City of San Diego Cost Estimate Unit Price List is used for determining valuation 18 Engineering $0-$40,000 $2,270.60 $1,462.95 0% $1,462.00 -$809 -36%19 Engineering $40,001-$100,000 $4,423.40 $2,538.58 0% $2,538.00 -$1,885 -43%20 Engineering $100,001-$200,000 $5,525.00 $3,909.88 0% $3,909.00 -$1,616 -29%21 Engineering $200,001+ $5,525 + $11.02 per $100 $6,232.06 0% $6,232.00 $707 13%22 S-115A Engineering23 S-115B Engineering Bluff Projects Deposit determined by staff with
charges at the fully allocated hourly
rate for all personnel involved plus
any outside costs as determined by S350.

NA NA
Deposit determined by staff with charges at the fully allocated hourly rate for all personnel involved plus any outside costs as determined by S-350. $0 0%
24 S-116 Public Improvement Permit/ Inspection
Construction Valuation** Per Resolution 2001-85, the most current City of San Diego Cost Estimate Unit Price List is used for determining valuation 25 Engineering $0-$40,000 $1,433.00 $1,462.95 0% $1,462.00 $29 2%26 Engineering $40,001-$100,000 $2,315.40 $2,538.58 0% $2,538.00 $223 10% Or a deposit determined by staff with charges at the fully allocated hourly rate for all personnel involved plus any outside Or a deposit determined by staff with charges at the fully allocated hourly rate for all personnel involved plus any outside Or a deposit determined by staff with charges at the fully allocated hourly rate for all personnel involved plus any outside 31 I

ENGINEERING SERVICES
#
Service Code # Dept. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ Fee Δ % 27 Engineering $100,001-$200,000 $3,417.00 $3,909.88 0% $3,909.00 $492 14% 28 Engineering $200,001+ $3,417 + $10.76 per $100 $6,232.06 0% $6,232.00 $2,815 82%29 S-116A Engineering30 S-116B Engineering Bluff Projects Deposit determined by staff with
charges at the fully allocated hourly
rate for all personnel involved plus
any outside costs as determined by S350.

NA NA
Deposit determined by staff with charges at the fully allocated hourly rate for all personnel involved plus any outside costs as determined by S-350. $0 0%
31 S-117 Engineering Public Improvement Deposits
Per Resolution 2001-85, the City of San
Diego Cost Estimate Unit Price List is
used for determining security amount
Per permit/inspection Based on an Engineer’s Estimate of the work performed under the permit. NA NA Per Resolution 2001-85, the City of San Diego Cost Estimate Unit Price List is used for determining security amount $0 0%
32 S-120 Engineering Geotechnical Plan Review/Inspection Deposit for third-party review at Cost + 15% Admin Fee Per application NA NA Deposit for third-party review at Cost + 15% Admin Fee $0 0%33 S-115 Engineering Encroachment Permit - Street Cut $833.00 Per permit $1,088.90 0% $1,088.00 $255 31% 34 S-115 Engineering Encroachment Permit - Standard $585.00 Per permit $766.92 0% $766.00 $181 31% 35 S-116 Engineering Encroachment Permit Deposit
Twice the estimated cost of removing
the encroachment, but in no case less
than $50.00
Per permit SBMC 11.20.230 NA NA
Twice the estimated cost of removing the encroachment, but in no case less than $50.00 $0 0%
36 S-120 Engineering Miscellaneous Engineering Permit/Inspection $244.00 Per permit/inspection $321.97 0% $321.00 $77 32% 37 S-125 / S- 125A Engineering Easement Abandon/Street Vacation $1,893.00 Per application Or a deposit determined by staff with charges at the fully allocated hourly rate for all personnel involved plus any outside costs as determined by S-350. $2,533.94 0% $2,533.00 $640 34% 38 S-127 Engineering Easement/R.O.W Dedication $524.00 Per application $703.34 0% $703.00 $179 34%39 S-130 Engineering Subdivision Monuments security deposit is based on estimate
provided by surveyor to set the
monuments.

Per application NA NA
security deposit is based on estimate provided by surveyor to set the monuments. $0 0%
40 S-135 Engineering Sewer Connection Fees41 S-135A Engineering Future Capacity = 50% 50% Per total of $4,500 per 1.0 EDU *Dependent on Sewer Fee Study NA NA 50% $0 0%42 S-135A Engineering Ocean Outfall = 27% 27% Per total of $4,500 per 1.0 EDU *Dependent on Sewer Fee Study NA NA 27% $0 0%43 S-135B Engineering Existing Facility = 23% 23% Per total of $4,500 per 1.0 EDU *Dependent on Sewer Fee Study NA NA 23% $0 0%44 S-140 Engineering Marine Safety Permit Deposit collected for:

Ramp Fee - $6 per round trip
Trip Fee - $3 per ton
plus $31 per day for days 1-30 and $57
per day for 31 and subsequent days
plus actual staffing costs (4 hour min)
Per Permit *To be revised based on ramp CIP project in progress NA NA Deposit collected for:Ramp Fee - $6 per round tripTrip Fee - $3 per tonplus $31 per day for days 1-30 and $57 per day for 31 and subsequent daysplus actual staffing costs (4 hour min) $0 0%
Or a deposit determined by staff with charges at the fully allocated hourly rate for all personnel involved plus any outside 32 I
Public Safety
#
Service Code # Dept. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ Fee Δ % 1 Fire Building Plan Check & Permit/Inspection2 S-410 Fire Plan Check (Commercial) $220.00 $401.28 0% $401.00 $181 82%3 S-411 Fire Permit/Inspection (Commercial) $149.00 $348.92 0% $349.00 $200 134%4 S-412 Fire Plan Check (Residential) $149.00 $209.35 0% $209.00 $60 40%5 S-413 Fire Permit/Inspection (Residential) $112.00 $209.35 0% $209.00 $97 87%6 S-414 Fire Reinspection (3rd Inspection) $112.00 $209.35 0% $209.00 $97 87%7 Fire Sprinkler Plan Check & Permit (Commercial)8 S-420 Fire Plan Check - Tenant Improvement (0-2500 sf) $73.00 $240.77 0% $241.00 $168 230%8 S-420 Fire Plan Check - Tenant Improvement (2501-5000 sf) $73.00 $321.03 0% $321.00 $248 340%8 S-420 Fire Plan Check - Tenant Improvement (5001-25000 sf) $73.00 $481.54 0% $482.00 $409 560%8 S-420 Fire Plan Check - Tenant Improvement (25001-50000 sf) $73.00 $642.05 0% $642.00 $569 779%8 S-420 Fire Plan Check - Tenant Improvement (>50001 sf, each addt'l 1000 sf) $73.00 $80.26 0% $80.00 $7 10%9 S-420 Fire Plan Check - New Actual Costs NA NA Actual Costs $0 0% 10 S-421 Fire Permit/Inspection - Tenant Improvement (0-2500 sf) $149.00 $209.35 0% $209.00 $60 40%10 S-421 Fire Inspection - Tenant Improvement (2501-5000 sf) $149.00 $279.14 0% $279.00 $130 87%10 S-421 Fire Inspection - Tenant Improvement (5001-25000 sf) $149.00 $418.71 0% $419.00 $270 181%10 S-421 Fire Inspection - Tenant Improvement (25001-50000 sf) $149.00 $558.28 0% $558.00 $409 274%10 S-421 Fire Inspection - Tenant Improvement (>50001 sf, each addt'l 1000 sf) $149.00 $69.78 0% $70.00 -$79 -53%11 S-421 Fire Permit/Inspection - New (0-2500 sf) $579.00 $418.71 0% $419.00 -$160 -28%10 S-421 Fire Permit/Inspection - New (2501-5000 sf) $579.00 $488.49 0% $488.00 -$91 -16%10 S-421 Fire Permit/Inspection - New (5001-25000 sf) $579.00 $558.28 0% $558.00 -$21 -4%10 S-421 Fire Permit/Inspection - New (25001-50000 sf) $579.00 $697.84 0% $698.00 $119 21%10 S-421 Fire Permit/Inspection - New (>50001 sf, each addt'l 1000 SF) $579.00 $69.78 0% $70.00 -$509 -88%12 Fire Sprinkler Plan Check & Inspection (Residential)13 S-422 Fire Plan Check 14 Fire 0-2,500 Sq. Ft. $112.00 $240.77 0% $241.00 $129 115%15 Fire 2,501-5,000 Sq. Ft. $142.00 $321.03 0% $321.00 $179 126%16 Fire 5,001-7,000 Sq. Ft. $149.00 $401.28 0% $401.00 $252 169%17 Fire 7,001+ Sq. Ft. $220.00 $561.80 0% $562.00 $342 155%18 S-423 Fire Permit/Inspection19 Fire 0-2,500 Sq. Ft. $112.00 $279.14 0% $279.00 $167 149%20 Fire 2,501-5,000 Sq. Ft. $149.00 $348.92 0% $349.00 $200 134%21 Fire 5,001-7,000 Sq. Ft. $181.00 $488.49 0% $488.00 $307 170%22 Fire 7,001+ Sq. Ft. $220.00 $697.84 0% $698.00 $478 217%24 Fire Alarm System - Plan Check & Inspection25 S - 424 Fire Plan Check - Initial Submittal, New System $149.00 or actual costs with charges at the fully allocated hourly rates for all personnel involved plus any outside costs. $401.28 0% $401.00 $252 169%
Plan Check - Tenant Improvement (0-5000 sf) New $401.28 0% $401.00 NA NAPlan Check - Tenant Improvement (5001-25000 sf) New $561.80 0% $562.00 NA NAPlan Check - Tenant Improvement (25001-50000 sf) New $722.31 0% $722.00 NA NAPlan Check - Tenant Improvement (>50000 sf, each addt'l 1000 sf) New $80.26 0% $80.00 NA NA 26 S - 425 Fire Permit/Inspection $475.00 $279.14 0% $279.00 -$196 -41% Pre-Wire and Final Inspection (0-5000 sf) New $348.92 0% $349.00 NA NAPre-Wire and Final Inspection (5001-25000 sf) sf) New $488.49 0% $488.00 NA NAPre-Wire and Final Inspection (25001-50000 sf) New $628.06 0% $628.00 NA NAPre-Wire and Final Inspection (>50000 sf each addt'I 1000 sf) New $69.78 0% $70.00 NA NA 27 Fire Specialty Protection System Plan Check & Permit/Inspection28 S - 426 Fire Plan Check $142.00 $481.54 0% $482.00 $340 239% 29 S - 427 Fire Permit/Inspection $78.00 $279.14 0% $279.00 $201 258%30 Fire Solar System Plan Check & Permit/Inspection31 S - 430 Fire Single Family Residential - included as part of Building fees NA NA included as part of Building fees $0 0% 32 S - 431 Fire Multi-Family, Commercial, or Industrial Plan Check $146.00 $240.77 0% $241.00 $95 65%33 S - 432 Fire Permit/Inspection $146.00 $209.35 0% $209.00 $63 43% 33 Public Safety
#
Service Code # Dept. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ Fee Δ % 34 S-440 Fire Fire Alt. Materials & Methods Rev $293.00 per application plus actual costs at the fully allocated hourly rates for all time after two hours $401.28 0% $401.00 $108 37%
Fire Protection Plan - SFD New $963.08 0% $963.00 NA NAFire Protection Plan - Multiple Unit Site New $1,605.13 0% $1,605.00 NA NA 35 S-442 Fire Underground Tank Installation - Removal P.C. Inspection $442.00 per permit $558.28 0% $558.00 $116 26% 36 S-444 Fire New Development Flow Test This service is provided by the Water District. NA NA This service is provided by the Water District. $0 0% 37 S-446 Fire Miscellaneous Fire Inspection $149.00 per hour $209.35 0% $209.00 $60 40% AB-38 Compliance Inspection New $209.35 0% $209.00 NA NA 38 S-447 Fire After Hour Inspection
Actual cost using fully
allocated hourly rates
($293 minimum)
NA NA
Actual cost using fully allocated hourly rates ($293 minimum) $0 0%
39 S-448 Fire Standby Charge
Actual cost using fully
allocated hourly rates
($662 minimum)
per request NA NA
Actual cost using fully allocated hourly rates ($662 minimum) $0 0%
40 S-460 Business Fire Safety Inspection
Per in-City business certificate application (S-620) & renewal (S626) 41 Fire B and M Occupancies
42 Fire 0-1,000 SF $112.00 $139.57 0% $140.00 $28 25%
43 Fire 1,000-3,500 SF $220.00 $279.14 0% $279.00 $59 27% 44 Fire 3,501-10,000 SF $293.00 $418.71 0% $419.00 $126 43% 45 Fire 10,001 SF $877.00 $907.20 0% $907.00 $30 3%
46 Fire All Other Occupancies
47 Fire 0-1,000 SF $220.00 $279.14 0% $279.00 $59 27%
48 Fire 1,000-3,500 SF $442.00 $488.49 0% $488.00 $46 10% 49 Fire 3,501-10,000 SF $585.00 $628.06 0% $628.00 $43 7% 50 Fire 10,001 SF $1,171.00 $1,116.55 0% $1,117.00 -$54 -5% 51 State Mandated Inspections
All annual inspection fees shall include time for the initial inspection and 1 reinspection. All subsequent reinspections may be charged an additional rate per inspection as determined by the AHJ. 52 Fire State Mandated R-2 Inspections (Apartments) 3-10 units/building New $481.54 0% $482.00 NA NA53 Fire State Mandated R-2 Inspections (Apartments) 11-40 units/building New $642.05 0% $642.00 NA NA54 Fire State Mandated R-2 Inspections (Apartments) > 40 units/building New $963.08 0% $963.00 NA NA 55 Fire State Mandated R-1 Inspections (Hotel/Motels) New $963.08 0% $963.00 NA NA56 State Mandated E Occupancies (private)57 Fire Pre-School New $561.80 0% $562.00 NA NA58 Fire Elementary/Middle School New $963.08 0% $963.00 NA NA59 Fire High School New $963.08 0% $963.00 NA NA60 S-470 False Alarm SBMC 4.3661 Community Dev. (Codes) First excessive false alarm $50.00 NA NA $50.00 $0 0% 62 Community Dev. (Codes) Second excessive false alarm $100.00 NA NA $100.00 $0 0% 63 Community Dev. (Codes) Third and each successive excessive false alarm $150.00 NA NA $150.00 $0 0%64 S-480 Marine Safety Marine Safety Junior Lifeguard Apparel & Accessories Cost plus 25% for
administrative fee rounded
to the nearest $1 dollar
price increment
NA NA
Cost plus 25% for administrative fee rounded to the nearest $1 dollar price increment $0 0%
34 Public Safety
#
Service Code # Dept. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ Fee Δ % 65 S-490 Marine Safety Junior Lifeguard
2-week sessions (4 - AM & 4 - PM) Groms (age 7-8) and Junior Lifeguards (ages 9-16) 66 Marine Safety Resident $359.00 per session NA NA $376.00 $17 5%67 Marine Safety Non-Resident $410.00 per session NA NA $430.00 $20 5% 35 COMMUNITY SERVICES
#
Service Code # Dept. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ Fee Δ % 1 S-510 Community Serv. Special Event Permit2 Community Serv. Resident/Non-Profit $51.00 per permit $973.29 95% $53.00 $2 4%3 Community Serv. Non-Resident $270.00 per permit $973.29 71% $283.00 $13 5%4 Community Serv. For Street Closure $826.00 per permit Block Parties are exempt from street closure rate $973.29 11% $867.00 $41 5%5 S-515 Community Serv. Sound Permit $10.00 per application $56.49 81% $10.50 $1 5%6 S-519 Finance Liability Insurance set by City's Insurance Broker Per event or rental NA NA set by City's Insurance Broker $0 0% 7 S-522 Community Serv. Day Camp Program (weekly rates)8 Community Serv. Day Camp: Age 5-119 Community Serv. Resident $172.00 NA NA $180.00 $8 5% 10 Community Serv. Non-Resident $223.00 NA NA $234.00 $11 5%11 Community Serv. Day Camp After Care: Age 5-1112 Community Serv. Resident $50.00 NA NA $52.00 $2 4%13 Community Serv. Non-Resident $76.00 NA NA $79.00 $3 4%14 Community Serv. Leader in Training: Age 13-17 $43.00 NA NA $45.00 $2 5%15 S-524 Community Serv. Sports Field Admin16 Community Serv. Resident $0.00 NA NA $0.00 $0 0%17 Community Serv. Non-Resident $23.00 NA NA $24.00 $1 4%18 S-526 Community Serv. Facility Rental (Community Center)19 Community Serv. Resident $68.00 per hour NA NA $71.00 $3 4%20 Community Serv. Non-Resident $73.00 per hour NA NA $76.00 $3 4%21 Community Serv. Non-Profit $10.00 per hour22 S-530 Community Serv. Fletcher Cove Community Center Facility Rental Friday 5pm -10pm & Sat/Sun 11am- 10pm 23 Community Serv. Resident $50.00 per hour Set by initiative NA NA $50.00 $0 0%24 Community Serv. Non-Resident $150.00 per hour Set by initiative NA NA $150.00 $0 0%25 Community Serv. Non refundable cleaning fee $150.00 $150.00 0% $150.00 $0 0%26 Community Serv. Refundable Security Deposit $500.00 NA NA $525.00 $25 5%27 Community Serv. Security Guard set by City's Contract NA NA set by City's Contract $0 0% 28 Community Serv. City Purchased Insurance $103.53 NA NA Premium Cost NA NA29 Community Serv. City Purchased Insurance w/ Alcohol $166.53 NA NA Premium Cost NA NA30 S-540 Community Serv. Public Art Consignment Fee $112.00 per application. + 24% of sale price if sold
For requests from artists to display their art in the public right of way per the MAP guidelines.

NA NA $117.00 $5 4%
36 To: City of Solana Beach City Council
From: Budget & Finance Commission
Scott Hermes
Chris Maulik
Larry Marmon
Ken Zito
Jeff Lyle
Date: January 14, 2025
Subject: Comprehensive Fee Study and Cost Allocation Plan The Budget and Finance Commission (“Commission”) of the City of Solana Beach reviewed and discussed the Comprehensive Fee Study and Cost Allocation Plan prepared by Willdan Financial Services (“Willdan”). Based on these discussions, the Commission believes staff thoroughly analyzed the information provided in the study and developed a balanced and well thought out set of proposed fees for Council members to consider that would bridge the gap between the City’s cost of providing services and the fees collected.

Staff provided some history and context, including:
 The previous comprehensive fee study and cost allocation plan began in 2017 and was completed in 2018
 Discussed the overall objective of the City to seek reimbursement for the full cost of providing most services and limit the subsidy provided by the General Fund  Noted the proposed percentage increase in some services is large  Recognize some fees are set by state law or negotiated contracts with providers  As proposed, the City could recover about $600K of costs, effectively increasing the funds available for general government services
Staff was receptive to our questions and open in discussing the rationale for the proposed fees. The Commission noted that, while there may be a desire to not significantly raise some fees, that approach would effectively create a subsidy borne by the city taxpayers not using such services. The Commission has the following recommendations for Council members to consider:
 A City ordinance currently limits (after implementing fees from the Comprehensive Fee Study) the maximum annual CPI fee increase at 2.5%. The Commission recommends seeking to modify the ordinance to allow the City to annually increase fees up to an appropriate inflation factor. This would help reduce any subsidy provided by the General Fund between comprehensive fee studies.
 For any new service, we recommend the City develop a formal process to determine the cost of a new service and set fees accordingly.  Seek backup data from Willdan on assumptions regarding the number of permits issued for each of the fees.
 Going forward, staff should track the number of permits issued as well as the associated costs to help staff to fully analyze the data and ensure the City is pricing the services it provides appropriately.

The Commission recognizes the significant staff time involved in completing a fee study.

Subject to an annual fee analysis demonstrating fees reasonably tracking as planned, the Commission recommends the City conduct a fee study every five years.

We enjoy working with Rachel, Kristine and Alyssa and appreciate not only their patience entertaining all of our questions Commission members have but also helping us better understand the overall picture of the City’s financial position.

CITY COUNCIL ACTION:
______________________________________________________________________ ______________________________________________________________________ AGENDA ITEM # B.2.

STAFF REPORT

CITY OF SOLANA BEACH
TO: Honorable Mayor and City Councilmembers
FROM: Alyssa Muto, City Manager
MEETING DATE: January 15, 2025
ORIGINATING DEPT: Community Development Department
SUBJECT: Public Hearing: DRP/SDP for Mixed-Use Building at 701 Valley Avenue (Case #: DRP22-010, SDP22-008; Applicant:

Daniel Witcher and Jouet Peterson; APN: 298-131-14-00;
Resolution No. 2024-120)
BACKGROUND:

The Applicants, Daniel Witcher and Jouet Peterson, are requesting City Council (Council) approval of a Development Review Permit (DRP) and Structure Development Permit (SDP) to demolish a single-story, single-family residence to construct a threestory, mixed-use development consisting of one (1) dental office, three (3) residential units, and a parking garage. The 10,064 square foot lot is located at 701 Valley Avenue and is located within the Commercial (C) Zone.

The Applicants propose to construct an 11,343 square foot mixed-use building consisting of 2,768 square feet of dental office; two residential studio units and one three-bedroom residential unit, totaling 2,984 square feet; and a two-level parking garage totaling 10,781 square feet, 6,005 square feet of which is subterranean. The proposed development includes grading in the amount of 2,255 cubic yards (CY) aggregate. The tallest point of the structure is proposed at 35 feet, or 63.65 above mean sea level (MSL). The project requires a DRP for 1) new commercial development in a commercial zone, and 2) aggregate grading that exceeds 100 CY. An SDP is required for construction in excess of 16 feet in height as measured from the existing grade.

The issue before the Council is whether to approve, approve with conditions, or deny the Applicant’s request as contained in Resolution 2024-120 (Attachment 1).

DISCUSSION:

The subject property is located on the west side of Valley Avenue, adjacent to La Colonia Park. The lot is rectangular in shape with approximately 47 feet of frontage January 15, 2025
DRP 22-010, SDP 22-008
Witcher – 701 Valley Ave

Page 2 of 14 ends

along Valley Avenue, southern and northern property lines of approximately 210 feet, and a western property line of approximately 48 feet. A drainage channel runs north to south through the westernmost portion of the lot. The lot is relatively flat aside from a dip of approximately one foot towards the center. Properties to the north, east and west are located within the C Zone and developed with office and commercial retail businesses. The property to the south is located within the Open Space Recreation (OSR) and developed with a public park (La Colonia Park). The property is currently developed with a single-story, single-family residence and a detached garage and shed, which will be demolished should the proposed project receive approval.

The Applicants propose to construct a new mixed-use development consisting of the following:
• 2,768 square feet of commercial dental office space
• Three (3) multi-family residential units totaling 2,984 square feet • Two (2) parking levels, one street level (12 spaces) and one subterranean level (10 spaces), totaling 10,781 square feet
• Roof deck (785 square feet)
• Courtyard
• Water feature
• Landscape and hardscape
The commercial dental office space would be located on the eastern half of the second floor. The two studio units (739 square feet each) would be located on the western half of the second floor, and the three-bedroom residential unit (1,506 square feet) would be located on the western half of the third floor. The proposed floor area ratio (FAR) would be 1.17, or 11,343 square feet, not counting the subterranean parking level.

Parking for the proposed project would be provided in a two-level parking garage, one level of which would be subterranean. A curb cut located in the southwest corner of the property would provide vehicular access to the street-level parking garage level and the subterranean parking garage level below, via Valley Avenue. A total of 22 parking spaces are required for the project, including 4 for the residential use and 18 for the commercial use. The proposed parking garage provides a total of 22 parking spaces, including 1 accessible space as required by the Americans with Disabilities Act (ADA) Standards for Accessible Design.

In order to construct the proposed Project, the Applicants are requesting that the Council consider approval of a DRP and SDP. A DRP is required for the following reasons: 1) new commercial development or construction located within any commercial zone resulting in more than 500 square feet; and 2) grading in excess of 100 cubic yards. An SDP is required because the proposed structure will exceed 16 feet in height as measured from the existing grade.

January 15, 2025
DRP 22-010, SDP 22-008
Witcher – 701 Valley Ave

Page 3 of 14 ends

Table 1 (next page) provides a comparison of the Solana Beach Municipal Code (SBMC) applicable zoning regulations with the Applicants’ proposed design.

Table 1

LOT INFORMATION
Property Address: 701 Valley Avenue
Zoning Designation:
# of Units Allowed:
# of Units Requested:

C (20 du/ac)
4 Dwelling Units, 1 ADU,
1 JADU
3 Dwelling Units
Lot Size: 10,064 ft2 (0.23 acres) gross area
9,173 ft2 (0.21 acres) net area (area of
parcel after lot split)
Setbacks: Required Proposed
Max. Allowable
Floor area:

1.2 or 11,584 ft2 Front (E) 0 ft. 10’ – 1”
Proposed Floor
area:

1.17 or 11,343 ft2 Interior Side (N) 0 ft. 0’ – 4 ¼”
Below Max. Floor
area by:
241 ft2 Interior Side (S) 0 ft. 0’ – 1 ¾”
Max. Allowable
Height:
35 ft. Rear (W) 0 ft. 14’ – 8 ½”
Max. Proposed
Height:

35.00 ft.

Highest
Point/Ridge:

63.65 MSL

PROPOSED PROJECT INFORMATION
Floor area Breakdown: Requested Permits:

DRP: A DRP is required for 1) new commercial
development in a commercial zone, and 2)
aggregate grading that exceeds 100 CY.

SDP: A SDP is required for a new structure that
exceeds 16 feet in height from the existing grade.

Subterranean Parking Level
First Floor Street Parking Level
Second Floor
Residential (Two Studio Units)
Commercial (Dental Office)
Service Areas
Third Floor
Residential (One 3-Bedroom Unit)
Service Areas
6,005 ft2
4,777 ft2
1,477 ft2
2,768 ft2
525 ft2
1,506 ft2
290 ft2
Subtotal
Basement Exemption
17,348 ft2
- 6,005 ft2
Total Floor Area 11,343 ft2
Proposed Grading: 2,255 CY of Aggregate Grading
(2,175 CY Site Grading; 80 CY Excavation for Footings; 0 CY Removal & Recompaction) Required Parking: 22 parking spaces
Proposed Parking: two-level parking garage,
totaling 22 spaces, including one (1) ADA spaces
Proposed Fences and Walls: Yes
Proposed Accessory Dwelling Unit: No
Proposed Accessory Structure: No
Existing Development:

Single-Family Residence and detached garage and
shed
To be demolished: Yes To Remain: N/A Other:

N/A
January 15, 2025
DRP 22-010, SDP 22-008
Witcher – 701 Valley Ave

Page 4 of 14 ends

As shown, the project meets the required setbacks listed in SBMC Table 17.24.030-B.

The project also complies with the SBMC regulations for the maximum building height, Floor Area Ratio (FAR) and density.

Resolution 2024-120 (Attachment 2) provides the full text of the pertinent regulations for the DRP and SDP and Staff has prepared draft findings of approval of the DRP and SDP for the Project for Council’s consideration based upon the information provided in this Staff Report. The Council may direct Staff to modify any of the Resolution to reflect the findings and conditions it deems appropriate as a part of the public hearing process.

The following is a discussion of the findings for a DRP and SDP as each applies to the proposed project, as well as a discussion of the development plans and recommended conditions as contained in the attached Resolution 2024-120.

Development Review Permit Compliance (SBMC Section 17.68.040):

A DRP is required for new commercial development in a commercial zone and that includes more than an aggregate total of 100 cubic yards of grading (SBMC Section

17.68.040). The project design includes grading in the amount of 2,255 cubic yards.

In addition to meeting zoning requirements, the project must also be found in compliance with development review criteria. The following is a list of the development review criteria topics:

1. Relationship with Adjacent Land Uses

2. Building and Structure Placement

3. Landscaping

4. Roads, Pedestrian Walkways, Parking, and Storage Areas

5. Grading

6. Lighting

7. Usable Open Space
The Council may approve, or conditionally approve, a DRP only if all of the findings listed below can be made. Resolution 2024-120 (Attachment 1) provides full discussion of the findings.

1. The proposed development is consistent with the general plan and all applicable requirements of the zoning ordinance including special regulations, overlay zones, and specific plans.

2. The proposed development complies with the development review criteria.

3. All required permits and approvals issued by the city, including variances, conditional use permits, comprehensive sign plans, and coastal development permits have been obtained prior to or concurrently with the development review permit.

January 15, 2025
DRP 22-010, SDP 22-008
Witcher – 701 Valley Ave

Page 5 of 14 ends

4. If the development project also requires a permit or approval to be issued by a state or federal agency, the city council may conditionally approve the development review permit upon the applicant obtaining the required permit or approval from the other agency.

If the above findings cannot be made, the Council shall deny the DRP.

In addition to meeting zoning requirements, the project must also be found in compliance with the development review criteria. The following is a discussion of the applicable development review criteria as they relate to the proposed project.

Relationship with Adjacent Land Uses:

The subject property is located within the General Commercial (C) Zone. The property is not located within any of the City’s Specific Plan areas; however, it is located within the Coastal Zone. As a condition of project approval, the Applicants will be required to obtain a Coastal Development Permit, Waiver, or Exemption from the California Coastal Commission prior to the issuance of a building permit.

Surrounding properties to the north, east and west are also located within the C Zone.

The property to the north is developed with a three-story commercial building, and atgrade parking lot. The properties to the east, across Valley Avenue, are developed with multi-family residences. The property to the west is undeveloped. The property immediately south of the subject site is zoned Open Space Recreation (OSR) and is developed with a park (La Colonia Park).

The proposed project is consistent with the General Plan, which designates the property as General Commercial (C) and allows for commercial development that would involve resident and visitor serving commercial uses and retail uses that have a minimal disturbance to nearby residential neighborhoods. Residential uses are allowed as a secondary use in conjunction with permitted commercial uses at a maximum density of 20 units per acre. The project could be found to be consistent with the following General Plan Policies:

Policy LU-1.6 Encourage the establishment of mixed-uses that provide for housing and jobs near transit routes, shopping areas, and recreational uses to promote public transit use, walking, and biking.

Policy LU-1.8 Within mixed-use areas, encourage an overall high quality streetscape design, where feasible and appropriate, that includes bike lanes; on-street parking; minimal curb cuts; enhanced crosswalks; appropriate sidewalk widths; parkways; street trees, planters, and wells; street lighting; street furniture; wayfinding; kiosks; enhanced paving; public art; and other features that contribute to the character of Solana Beach.

January 15, 2025
DRP 22-010, SDP 22-008
Witcher – 701 Valley Ave

Page 6 of 14 ends

The project could be found to be consistent with the following General Plan goals and programs in the City’s Housing Element:

Goal 1.0: The adequate provision of a range of safe and decent housing opportunities that will meet Solana Beach’s share of the existing and future housing needs of the region.

Goal 2.0: Maintenance, preservation, and enhancement of community and neighborhood character and the quality of residential neighborhoods and commercial areas.

Program 1: Encourage mixed-use development.

The proposed mixed-use development is consistent with the permitted uses for the General Commercial (C) Zone found in SBMC Sections 17.24.020 and 17.24.030 which allows for a maximum of 20 dwelling units per net acre. The maximum number of units is determined by multiplying the net acreage of the lot by the maximum dwelling unit density permitted for the zone. The lot is 9,173 square feet or 0.21 acres. Therefore,

0.21 acres X 20 dwelling units per acre = 4.21 units. The proposed project is proposing three (3) residential units.

The C Zone indicates that residential units shall be permitted only on the upper floors, basement and rear 50% of the ground floor. As designed, the residential units will be located on the second and third floors.

No adverse effects upon neighboring properties have been identified or are anticipated to occur from the project implementation. As conditioned, the proposed project gives consideration to the protection of surrounding areas from potential adverse effects and provides protection of the property from adverse surrounding influences such as negative impacts of light, air, and noise.

Building and Structure Placement:

The proposed development includes one three-story, mixed-use building, including a two-story parking garage, comprised of a grade-level parking floor and a subterranean level parking floor. A curb cut located in the southwest corner of the property would provide vehicular access from Valley Avenue to the street-level parking garage level and the subterranean parking garage level below.

The 2,768 square foot commercial dental office would be located on the east side of the second floor. The commercial suite is accessed from the parking garage by a private elevator. The suite can also be accessed from the stairwell and at-grade exit corridor via Valley Avenue. The building does not exceed two stories on the eastern half, instead there is a 785 square foot roof deck above the commercial dental office intended for residential use. The development standards for mixed use development in the C Zone do not require a minimum setback from Valley Avenue, however, the Applicants January 15, 2025
DRP 22-010, SDP 22-008
Witcher – 701 Valley Ave

Page 7 of 14 ends
← All documents from this meeting