I. CALL TO ORDER
II. ROLL CALL
III. PLEDGE OF ALLEGIANCE
IV. ADDITIONS/MODIFICATIONS TO THE AGENDA
V. PUBLIC COMMENT
VI. COUNCIL PRESENTATIONS
CITY OF SOLEDAD
JOINT CITY COUNCIL/SUCCESSOR AGENCY/HOUSING AUTHORITY AND SUCCESSOR
HOUSING AGENCY REGULAR MEETING AGENDA
WEDNESDAY, JUNE 19, 2024
CITY HALL, COUNCIL CHAMBERS
6:00 PM
The public meeting will open at 6:00 p.m. and, after taking public comment for closed session items, the Council will immediately recess to closed session.
Welcome to your City of Soledad City Council/Successor Agency Meeting. Your City Councilmembers/Agencymembers are:
Mayor Anna Velazquez
Mayor Pro Tem Maria Corralejo
Councilmember Fernando Cabrera
Councilmember Fernando Ansaldo-Sanchez
Items of business may be added to the agenda upon a motion adopted by a minimum 2/3 vote finding that there is a need to take immediate action and that the need for action came to the attention of the City subsequent to the agenda being posted. Items may be deleted from the agenda upon request of staff or upon action of the Council.
At this time any member of the public may address the City Council on items not appearing on the agenda and items of interest to the public that are within the jurisdiction of the Council. A public comment card should be filled out completely to ensure the speaker is called upon to give comment. Public comments are generally limited to three (3) minutes; the mayor may further limit the time for public comments depending on the agenda schedule. Please be brief and to the point.
No action or discussion shall be taken on an item not appearing on the agenda. 1 VII. CONSENT CALENDAR
1. Resolution No. 6104, A Resolution of the City Council of the City of Soledad Certifying Compliance with State Law with Respect to the Levying of General and Special Taxes, Assessments and Property-Related Fees and Charges for Fiscal Year 2024/2025
2. Resolution No. 6113, a Resolution of the City Council of the City of Soledad Approving a Memorandum of Understanding Between the City of Soledad and the Soledad Police Officers Association Beginning July 1, 2024 and Ending June 30, 2027
3. Resolution No. 6114, A Resolution of the City Council of the City of Soledad Approving a Contract Amendment No. 2 for Professional Services with CSG Consultants, Inc. for a Total Not Exceed $225,000 for Providing Building Division Services, Stormwater Management Services, a Contract Building Official , and other related services.
4. Resolution No. 6117, A Resolution of the City Council of the City of Soledad Approving a Consulting Services Agreement Task Order No. 3 in the Amount of $32,770 with Pavement Engineering Inc. for Engineering Support Services to Perform a Pavement Evaluation for the West Street Road Diet and Complete Streets Project and Authorize the City Manager to Execute Said Task Order on Behalf of the City of Soledad
5. Resolution No. 6118, A Resolution of the City Council of the City of Soledad Accepting the Dixi
1. A Proclamation of the City Council of the City of Soledad Recognizing June 19th, 2024 as Juneteenth.
Attachments:
Staff Report
Resolution No. 6104
COUNCIL ACTION: ________________________________
Attachments:
Staff Report
Resolution No. 6113
COUNCIL ACTION: ________________________________
Attachments:
Staff Report
Resolution No. 6114
Exhibit A
A - CSG Proposal to the City of Soledad - Contract Extension COUNCIL ACTION: ________________________________
Attachments:
Staff Report
Resolution No. 6117
Exhibit A
COUNCIL ACTION: ________________________________
2 Street Sewer and Water Replacement Improvements, City Project No. W22-7 & WW22-03 Project as Complete by Anderson Pacific Engineering Construction, Inc. and Authorizing the Release of Retention in the Amount of $90,574.81
6. Resolution No. 6110, A Resolution of the City Council of the City of Soledad Amending the City's Conflict of Interest Code
7. Resolution No. 6011, A Resolution of the City Council of the City of Soledad ELECTIONS
8. Resolution No. 6119, a Resolution of the City Council of the City of Soledad Accepting a List of Projects Funded By SB 1: The Road Repair and Accountability Act for Fiscal Year 2024/2025 VIII. PUBLIC HEARING NO. 1
1. Resolution Nos. 6105, 6106, 6107, 6108 & 6109, Resolutions of the City Council of the City of Soledad Ordering the Levy and Collection of Assessments for Various Districts for Fiscal Year 2024/2025
Attachments:
Staff Report
Resolution No. 6118
COUNCIL ACTION: ________________________________
Attachments:
Staff Report
COUNCIL ACTION: ________________________________
Attachments:
Staff Report
COUNCIL ACTION: ________________________________
Attachments:
Staff Report
Resolution No. 6119
Exhibit A - Crack Seal Map Street Locations
COUNCIL ACTION: ________________________________
Receive the Staff Report
Open the Public Hearing
Close the Public Hearing
Council Action
Attachments:
Staff Report
Assessment_District_Map
1. Resolution No. 6105 and Engineer Report - BAD Diamond Ridge No. 1 Levy FY24-25
2. Resolution No. 6106 and Engineer Report - MAD Diamond Ridge No. 1 Levy FY24-25 3 IX. PUBLIC HEARING NO. 2
1. Ordinance No. 769, Consider Waiver of Reading, Adoption and Read by Title Only Ordinance No. 769 “An Ordinance of the City Council of the City of Soledad Establishing a New Truck Route Pursuant to Chapter 10.62 Truck Routes of Title 10-Vehicles and Traffic of the Soledad Municipal Code"
X. PUBLIC HEARING NO. 3
1. Resolution No. 6115, A Resolution of the City Council of the City of Soledad Approving and Accepting the S9oledad Police Department's AB 481 Fiscal Year 2023-2024 Annual Military Equipment Use Report Pursuant to Government Code Section 7071 (d) and Renewing City of Soledad Ordinance No. 743 "Approving Soledad Police Department Policy Manuel Policy 706- Military Equipment"
XI. PUBLIC HEARING NO. 4
1. Resolution No. 6116, A Resolution of the City Council of the City of Soledad Approving Planned Unit Development Permit No. 1 (PUD 2018-02) Miravale Parcel E Amendment No.
3. Resolution No. 6107 and Engineer Report - MAD Orchard Villa-Miravalle II Levy FY24-25
4. Resolution No. 6108 and Engineer Report - BAD Orchard Villas-Miravale II Levy FY24-25
5. Resolution No. 6109 and Engineer Report - MAD Rancho San Vicente Levy FY24-25 Receive the Staff Report
Open the Public Hearing
Close the Public Hearing
Council Action
Attachments:
Staff Report
Attachment A-Current Truck Route
Attachment B-Old Truck Route
Attachment C-Public Notice - Ord. No. 769
Ordinance No. 769
Exhibit A-Old Truck Route
Receive the Staff Report
Open the Public Hearing
Close the Public Hearing
Council Action
Attachments:
Staff Report
Resolution No. 6115
Exhibit A - Soledad Police Department Annual Military Equipment Report Exhibit B - Ordinance No. 743
Receive the Staff Report
Open the Public Hearing
Close the Public Hearing
Council Action
4 1
XII. BUSINESS
1. Resolution No. 6112, a Resolution of the City Council of the City of Soledad Approving an Agreement with the California Department of Forestry and Fire Protection for Services from July 1, 2024 to June 30, 2025 at a Not to Exceed Cost of $2,152,140 for the Duration of the Term, and Authorizing the City Manager to Execute Said Agreement on Behalf of the City of Soledad
2. Resolution No. 6103, a Resolution of the City Council of the City of Soledad Approving the Master Fee Schedule for Fiscal Year 2024-2025.
3. Acceptance of the City and Soledad Successor Agency's Audited Financial Statements for Fiscal Year 2022-2023
4. Resolution No. 6102, a Resolution of the City Council of the City of Soledad Approving a Cooperation Agreement with the Department of the Army for P.L. 84-99 Rehabilitation of Federal Flood Control Work with City’s Share of Costs in the Amount of $703,698 Plus $50,000 for Construction Contingency for Repairs of the Levee Protecting Soledad’s Water Reclamation Facility from Flood Inundation from the Salinas River And Authorizing The City Manager to Execute Said Agreement on Behalf of the City of Soledad Attachments:
Staff Report
Resolution No. 6116
3. Exhibit A Parcel E PUD
2- Santa Clara Parcel E Amendment Application
Attachments:
Staff Report
Resolution No. 6112
COUNCIL ACTION: ________________________________
Attachments:
Staff Report
Resolution No. 6103
Exhibit A - Master Fee Schedule Proposed FY 2024-25
COUNCIL ACTION: ________________________________
Attachments:
Staff Report
Independent Auditor's Report and Financial Statements FY 2022-23 Management Report FY 2022-23
Measure Y and S Letter 2023
COUNCIL ACTION: ________________________________
Attachments:
5 XIII. MAYOR'S ANNOUNCEMENTS AND REPORTS
XIV. COUNCILMEMBERS' ANNOUNCEMENTS AND REPORTS
XV. COUNCILMEMBERS' PRAISES
XVI. CITY MANAGER'S REPORT
XVII. FUTURE AGENDA ITEMS
XVIII.ADJOURNMENT
Staff Report
Resolution No. 6102
Exhibit A - USACE Draft Agreement- WRD Fac. Levee Repairs.pdf WRF Levee Photos
COUNCIL ACTION: ________________________________
In compliance with the American with Disabilities Act, if you need special assistance to participate in this meeting, please contact Deputy City Clerk Darlene Noriega at (831) 223-5014. Notification of at least 48 hours prior to the meeting will enable the City to make reasonable arrangements to ensure accessibility to this meeting. (RCRF 35.102-35.104).
“Any writing or documents provided to a majority of the City Council regarding any item on this agenda will be made available for public inspection at City Hall located at 248 Main Street, Soledad, California during normal business hours.”
En caso que usted necesite ayuda en leer o en entender este aviso de Junta Publica, usted puede ponerse en contacto con la oficina del Edificio Municipal en 248 Calle Main o llamar al número (831) 223-5014, y el aviso será traducido para usted.
Advanced submittal of public comments via email are due by 2:00 P.M. on the day of the scheduled meeting to the Deputy City Clerk at [email protected] Comments are limited to 250 words or less and effort will be made to read your comment into the record, but some comments may not be read due to time limitations. The City Clerk will read email comments, provided that the reading shall not exceed three (3) minutes. The email comments submitted shall become part of the record.
Comentarios públicos por correo electrónico deben realizarse no más tarde de las 2:00 p.m. el día de la reunión programada y deben ser enviados al Secretario de la Ciudad a [email protected]. Los comentarios son limitados a 250 palabras o menos y se hará un esfuerzo para leer su comentario en el registro, pero es posible que algunos comentarios no se lean debido a limitaciones de tiempo. El Secretario de la Ciudad leerá los comentarios por correo electrónico, siempre que la lectura no exceda los tres (3) minutos. Los comentarios enviados por correo electrónico pasarán a formar parte del registro.
6 SUBJECT: Resolution No. 6104, A Resolution of the City Council of the City of Soledad Certifying Compliance with State Law with Respect to the Levying of General and Special Taxes, Assessments and PropertyRelated Fees and Charges for Fiscal Year 2024/2025 TO: Honorable Mayor Velazquez and City Council
FROM: Donald Wilcox, Public Works Director
MEETING DATE: June 19, 2024
CITY OF SOLEDAD
STAFF REPORT
THROUGH: Megan Hunter, City Manager
AGENDA ITEM NO. 1.
Recommendation
It is recommended that the City Council of the City of Soledad consider and Adopt Resolution No. 6104, Certifying Compliance with State Law with respect to the Levying of General and Special Taxes, Assessments and Property-Related Fees and Charges for Fiscal Year 2024/2025.
Executive Summary
Proposition 218 (Prop 218) was approved by the state’s voters in November 1996. In general, the intent of Prop 218 is to ensure that all taxes and most charges to property owners are subject to voter approval.
Accordingly, the County’s Auditor-Controller requires an annual resolution indicating the City is meeting Prop 218 requirements in order to process FY 2024-25 secured tax roll bills. The County will not place any existing or additional taxes, assessments, fees or charges on the tax roll without a certification resolution on file with their office. Consideration of the attached resolution certifying compliance is necessary for the 2024-2025 year.
Background
Proposition 218 (Prop 218) was approved by the state’s voters in November 1996. Prop 218's requirements span a large spectrum, including local initiatives, water standby charges, legal standards of proof, election procedures and the calculation and use of sewer assessment revenues. In general, the intent of Prop 218 is to ensure that all taxes and most charges to property owners are subject to voter approval. Accordingly, the County’s Auditor-Controller requires an annual resolution indicating the City is meeting Prop 218 requirements in order to process FY 2024-25 secured tax roll bills.
Review & Analysis
The proposed resolution certifies compliance with Proposition 218 and includes a hold harmless and 7 Resolution No. 6104
indemnification provision for administrative expenses of the County associated with the collection of the City of Soledad’s taxes, assessments, fees, and charges other than the 1% ad valorem tax. The County will not place any existing or additional taxes, assessments, fees, or charges on the tax roll without a certification resolution on file with their office. The attached resolution is necessary for the 2024-2025 year.
Financial Considerations
None.
Alternatives
Adopt the recommended resolution.
Do not approve the attached resolution.
Planning/CEQA
The approving of the resolution “Certifying Compliance with State Law with respect to the Levying of General and Special Taxes, Assessments and Property-Related Fees and Charges” is not considered a project for the purposes of CEQA since it has no potential for resulting in either a direct or indirect impact to the environment. (See CEQA Guidelines Section 15378.) Public Notice Requirements
None
Attachment(s):
8 RESOLUTION NO. 6104
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SOLEDAD
CERTIFYING COMPLIANCE WITH STATE LAW WITH RESPECT TO THE LEVYING OF GENERAL AND SPECIAL TAXES, ASSESSMENTS AND PROPERTYRELATED FEES AND CHARGES FOR FISCAL YEAR 2024/2025 WHEREAS, the City of Soledad (“Public Agency”) requests that the Monterey County Auditor-Controller enter those general or special taxes, assessments or property-related Fees or charges identified in Exhibit “A” on the tax roll for collection and distribution by the Monterey County Treasurer-Tax Collector commencing with the property tax bills for fiscal year 2024-2025.
BE IT HEREBY RESOLVED by the City Council of the City of Soledad as follows:
1. The Public Agency hereby certifies that it has, without limitation, complied with all legal procedures and requirements necessary for the levying and imposition of the general or special taxes, assessments or property-related fees or charges identified in Exhibit A, regardless of whether those procedures and requirements are set forth in the Constitution of the State of California, in State Statutes or in the applicable decision law of the State of California.
2. The Public Agency further certifies that, except for the sole negligence or misconduct of the County of Monterey, its officers, employees and agents, with regards to the handling of the CD or electronic file identified as Exhibit “A”, the Public Agency shall be solely liable and responsible for defending, at its sole expense, cost and risk each and every action, suit or other proceeding brought against the County of Monterey, its officers, employees and agents for every claim, demand or challenge to the levying or imposition of the general or special taxes, assessments or property-related fees or charges identified in Exhibit “A” and that it shall pay or satisfy any judgment rendered against the County of Monterey, its officers, employees and agents on every such action, suit or other proceeding, including all claims for refunds and interest thereon, legal fees and court costs and administrative expenses of the County of Monterey to correct the tax rolls.
PASSED AND ADOPTED by the City Council of the City of Soledad at a regular meeting duly held on the 19th day of June 2024, by the following vote:
AYES, and in favor thereof, Councilmembers:
NOES, Councilmembers:
ABSENT, Councilmembers:
ABSTAIN, Councilmembers:
__________________________________
ANNA M. VELAZQUEZ, Mayor
ATTEST:
___________________________________
MEGAN HUNTER, City Manager
9 EXHIBIT “A”
TO
RESOLUTION CERTIFYING COMPLIANCE WITH STATE LAW WITH RESPECT
TO THE LEVYING OF GENERAL AND SPECIAL TAXES, ASSESSMENTS AND PROPERTY-RELATED FEES AND CHARGES FOR FISCAL YEAR 2024/2025 FISCAL YEAR 2024-25
GENERAL TAXES:
N/A
SPECIAL TAXES:
N/A
ASSESSMENTS:
a.) Diamond Ridge Benefit Assessment District No. 1.
b.) Diamond Ridge Parks and Open Spaces Maintenance Assessment District No. 1 (Miravale, Phase 1).
c.) Parks and Open Space Maintenance Assessment District No. 1, Orchard Villas/Miravale II. d.) Benefit Assessment District No. 2, Orchard Villas/Miravale II. e.) Rancho San Vicente Parks and Open Spaces Maintenance Assessment District.
PROPERTY-RELATED FEES AND CHARGES:
N/A
10 SUBJECT: Resolution No. 6113, a Resolution of the City Council of the City of Soledad Approving a Memorandum of Understanding Between the City of Soledad and the Soledad Police Officers Association Beginning July 1, 2024 and Ending June 30, 2027
TO: Honorable Mayor Velazquez and City Council
FROM: Mike Howard, Finance Director
MEETING DATE: June 19, 2024
CITY OF SOLEDAD
STAFF REPORT
THROUGH: Megan Hunter, City Manager
AGENDA ITEM NO. 2.
Recommendation
It is recommended that the City Council of the City of Soledad adopt Resolution No.6113, Approving a Memorandum of Understanding between the City of Soledad and the Soledad Police Officers Association Beginning July 1, 2024 and Ending June 30, 2027.
Executive Summary
The current three-year Memorandum of Understanding (MOU) with the Soledad Police Officers Association (SPOA) will expire on June 30, 2024. Union Representatives and the City’s designated negotiators began negotiations in April 2024 for a successor agreement. Through several meetings the parties reached a tentative agreement on June 3, 2024. The Union Representatives presented the new tentative agreement to the membership on June 5, 2024, where the agreement was ratified by the membership. The MOU is now before the City Council for consideration and adoption.
Background
On July 21, 2021, the City Council approved a three-year MOU with the Soledad Police Officers Association. The MOU, which sets forth specific negotiated terms and conditions of employment, is set to expire on June 30, 2024. The City and representatives of the Soledad Police Officers Association began negotiations in April 2024 for a successor MOU, and have reached a tentative agreement.
Review & Analysis
The City was notified that the tentative agreement was ratified by the SPOA membership on June 5, 2024. Below are key tentative agreements reflected in the MOU:
Term: Three years, ef ective July 1, 2024 through June 30, 2027 11 Compensation: In year one, a four percent (4.00%) salary increase ef ective the first full pay period of July 2024, and in year two, an additional three and one-half percent (3.50%) salary increase ef ective the first full pay period of July 2025, and in year three, an additional three and one-quarter percent (3.25%) salary increase ef ective the first full pay period of July 2026.
In the second year of the MOU, Bilingual Pay will be increased from $150/month to $225/month on the first full pay period in July 2025
A Sworn Of ice will be paid 3% of their base pay when assigned as a Field Training Of icer (FTO). The FTO Pay will only be paid on the days the of icer actually works as an FTO. This changes current practice where if an of icer worked only one day as an FTO they were paid FTO Pay for the entire pay period.
A Seargent that is assigned as a Detective will be paid $55/day as Stand-by Pay if and only if the Chief or designee formally places the Detective on Stand-by in writing.
Other Benefits: The annual uniform allowance will be $1,000, payable in two installments; $500 in October and $500 in April. Unit members will now be responsible for the purchase and maintenance of their own uniforms which will reduce City staf time ordering and processing invoices for payment of annual uniforms. This new provision will combine Article 4 Uniform Maintenance Allowance and Article 17 Purchase of Uniforms
In addition, the City will contribute up to $600 annually, in December, to an employee’s 457 plan. The City will contribute $ .20 (twenty cents) for every $1.00 (one dollar) an employee contributes up to the maximum of $600. In order to receive the contribution, the employee must be in active status at the time of the City contribution.
An additional 5% of base pay will be paid as Longevity Pay once a unit member has reached 20 years of service with the City as a sworn of icer.
The Health Club Membership stipend will be increased from $15/month to $35/month.
The City will add Juneteenth as an observed City Holiday.
Full details including additional contract terms are attached in the attached Memorandum of Understanding, marked as “Exhibit A”.
Financial Considerations
The cost of the 3-year agreement will be approximately $351,500. Year one of the agreement will cost approximately $143,600, year two will be approximately $117,500, and year three will be approximately $90,400. The current year budget (FY 2024-25) will cover the increase for the first year and the second and third years will be programed into the future budgets.
Alternatives
12 Resolution No. 6113
Adopted the proposed Resolution No. 6113
Do not adopt the proposed Resolution. This will require the City to continue negotiations with SPOA
Planning/CEQA
The approving of the Memorandum of Understanding between the City of Soledad and the Soledad Police Officers Association is not considered a project for the purposes of CEQA since it has no potential for resulting in either a direct or indirect impact to the environment. (See CEQA Guidelines Section 15378.)
Public Notice Requirements
None required.
Attachment(s):
13 RESOLUTION NO. 6113
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SOLEDAD
APPROVING A MEMORANDUM OF UNDERSTANDING BETWEEN THE CITY OF
SOLEDAD AND THE SOLEDAD POLICE OFFICERS ASSOCIATION BEGINNING JULY 1, 2024 AND ENDING JUNE 30, 2027
WHEREAS, the Memorandum of Understanding, “MOU” between the City and the Soledad Police Officers Association (SPOA) is set to expire on June 30, 2024; and WHEREAS, over the past three months, the City and SPOA representatives have met-and-conferred in good faith and reached an agreement for a successor MOU; and WHEREAS, on June 5, 2024, SPOA representatives and unit members met and ratified the tentative agreements.
NOW THEREFORE, BE IT HEREBY RESOLVED, that the City Council of the City of Soledad hereby approves the Memorandum of Understanding between the City and the Soledad Police Officers Association for the period July 1, 2024 through June 30, 2027, and all attachments in the form of the document hereunto attached, and incorporated herein by reference, marked “Exhibit A.”
PASSED AND ADOPTED at a regular meeting duly held on the 19th day of June 2024, by the following vote:
AYES, and in favor thereof Councilmembers:
NOES, Councilmembers:
ABSENT, Councilmembers:
ABSTAIN, Councilmembers:
ANNA M. VELAZQUEZ, Mayor
ATTEST:
MEGAN HUNTER, City Clerk
14 SUBJECT: Resolution No. 6114, A Resolution of the City Council of the City of Soledad Approving a Contract Amendment No. 2 for Professional Services with CSG Consultants, Inc. for a Total Not Exceed $225,000 for Providing Building Division Services, Stormwater Management Services, a Contract Building Official , and other related services.
TO: Honorable Mayor Velazquez and City Council
FROM: Kao Nou Yang. Community & Economic Development Director MEETING DATE: June 19, 2024
CITY OF SOLEDAD
STAFF REPORT
THROUGH: Megan Hunter, City Manager
AGENDA ITEM NO. 3.
Recommendation
It is recommended that the City Council of the City of Soledad consider and adopt Resolution No.6114, “Approving a Contract Amendment No. 2 for Professional Services with CSG Consultants, Inc. for a total not exceed $225,000 to Provide Building Division Services, Stormwater Management Services, a Contract Building Official , and Other Related Services.” Executive Summary
CSG Consultants Inc. has provided professional services to the City of Soledad since 2011, particularly in the Community and Economic Development Department. The contract for professional services has been extended annually. The professional services include a Contract Building Official, building plan review, civil plan review, stormwater compliance, and enforcing construction and demolition recycling requirements. City staff is seeking approval of Amendment No. 2 for a 6-month extension for these services in the 2024-2025 Fiscal Year (July 2024 – December 2024) and adding new services like Stormwater Inspections and additional compliance.
Background
CSG Consultants Inc. has been providing services to the City of Soledad since 2011, mainly for residential and commercial plan checks, fire inspections, and backup inspection services. Funding for these projects has been paid directly by applicants through the payment of permit fees to the City.
In July 2016, the City entered into a side letter with CSG to provide Permit Technician Services to assist at the front counter. Subsequently, on October 3, 2016, the Building Official retired from the City of Soledad. Following this event, CSG ceased the provision of Permit Technician services to the City but continued to offer the services of a Contracted Building Official, as well as plan check services. The 15 professional relationship between the CSG employees assigned to work in Soledad and both the staff and the public has been positively regarded. As a means to ensure ongoing quality public service with a forward-thinking approach, CSG Consultants has undertaken the provision of inspection services to the City on a part-time basis.
Due to an increase in State reporting requirements, CSG has assumed additional responsibilities to maintain the progress of current projects, specifically in the realm of civil engineering reviews.
Moreover, CSG has assumed the responsibility for stormwater plan review tasks, which were previously undertaken by Harris and Associates. Furthermore, in compliance with CalRecycle mandates, external CSG staff is supporting the City of Soledad and the local CSG team in adhering to the intricate construction and demolition recycling requirements.
On June 21, 2023, the City Council approved Amendment No. 1 of the contract for professional services with CSG Consultants, extending the contract for an additional year with the intention of conducting a Request for Proposal/Request for Quote for the 2024-2025 Fiscal Year.
Review & Analysis
The current contract for CSG, approved in June 2023, is set to expire on June 30, 2024. City staff is requesting to amend the current contract to extend it by 6 months (July 2024 to December 2024). This extension will allow the City to prepare a request for proposal/qualifications (RFP/RFQ) to solicit proposals for building services, engineering plan check services, and stormwater management services.
Currently, CSG is paid for the following services at the following rates but not limited to:
CSG Services Provided:
Fiscal Year 23-24 (Current) Per
Hour
Fiscal Year 24-25 (Proposed)
Per Hour
Building Official - Staff $139.00 $146.00
Fire Marshall / Inspector - Staff $127.00 $135.00
Building Inspections $110.00 $115.00
Fire Inspections $135.00 $135
Building / Civil Engineering /
Stormwater Plan Check Review
75% of Building Plan Check Fees
(Per Permit)
75% of Building Plan Check Fees
(Per Permit)
Engineering Services $147.00-$247.00 $135.00-$270.00
Additional Services:
Fiscal year 23-24 (Current) Per
Hour
Fiscal Year 24-25 (Proposed)
Per Hour
Stormwater Inspections (Trained
and Performed by Building
Official)
N/A $115.00
The Full Proposed Scope of Services and Staff is in detailed and attached with Exhibit “A” the Professional Service Agreement.
The estimated cost for extending the service for six months, from July 2024 to December 2024 in the 2024-2025 fiscal year, is expected to not exceed $225,000.. It is anticipated that the fees will continue to be funded by ongoing developments that pay for permits, with the majority of the funding coming from dedicated project development reimbursement accounts outside of the General Fund Budget.
Currently, the revenue from building and plan checks covers all the costs of the contract. 16 Resolution No. 6114
Exhibit A
A - CSG Proposal to the City of Soledad - Contract Extension CSG has been delivering satisfactory services to the City since 2011. However, the City has not conducted a Request for Proposals (RFP) for these services since that period. The City is scheduled to conduct an RFP/RFQ in the 2nd Quarter of 2024 to request proposals for building services, civil engineering plan check services and stormwater management services. It is expected that a substantial number of consultants will submit their proposals, and a service proposal will be presented to the Council before December of 2024.
Financial Considerations
The total contract amount with CSG is anticipated to cost an amount not to exceed $225,000.00 which will be funded by a combination of applicant deposits and a line item in the Building Department (Account 100-5160-3000).
Alternatives
Approve the Resolution and proposed contract for FY 24-25; or Approve the Resolution with modification to the proposed contract; or Do not approve the contract amendment. This alternative would require immediate considerations of an alternate method to provide services at the current time.
Planning/CEQA
The proposed professional services are not considered a project as defined by the California Environmental Quality Act (CEQA) (CEQA Guidelines Section 15378). Because the professional service agreement does not cause a direct or foreseeable indirect physical change on or in the environment, this matter is not a project. Any subsequent discretionary projects resulting from this action will be assessed for CEQA applicability.
Public Notice Requirements
None Required.
Attachment(s):
17 RESOLUTION NO. 6114
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SOLEDAD APPROVING A CONTRACT AMENDMENT NO. 2 FOR PROFESSIONAL SERVICES WITH CSG CONSULTANTS, INC. FOR A TOTAL NOT EXCEED $225,000 FOR
PROVIDING BUILDING DIVISION SERVICES, STORMWATER MANAGEMENT
SERVICES, A CONTRACT BUILDING OFFICIAL, AND OTHER RELATED SERVICES.
WHEREAS, in 2011, the City entered into an Agreement with CSG Consultants Inc. to provide plan check review and building inspection services to the City of Soledad; and WHEREAS, the City has continued to utilize CSG Consultant, Inc. services to provide a Contracted Building Official, Building, Fire, Civil and Stormwater Plan Reviews, Building and Fire Inspections, and Construction and Demolition Ordinance compliance; and WHEREAS, the City wants to continue these services listed above as well as add Stormwater compliance and Inspection to the contract to help further assist the City of Soledad process building permits and ensure the safety of new construction projects and existing buildings and structures; and
WHEREAS, these CSG services will be funded by a combination of building permit applicant deposits and a line item in the Building Department (Account 100-5160-3000).
WHEREAS, it is recommended that the Council approve Amendment No. 2 to continue these services with CSG Consultants Inc. for six (6) months, beginning on July 1, 2024, and expiring on December 31, 2024 (Fiscal Year) 2024-2025.
WHEREAS, proposed Amendment no. 2 of the professional services are not considered a project as defined by the California Environmental Quality Act (CEQA) (CEQA Guidelines Section 15378)
NOW THEREFORE, BE IT HEREBY RESOLVED by the City Council of the City of Soledad to approve Amendment No. 2 of Professional Service Agreement between the City and CSG Consultants, Inc., in an amount not to exceed $225,000, a copy of which is attached hereto as “Exhibit A” and Attachment No. A by this reference incorporated herein, is hereby approved and the City Manager is authorized and directed to execute the same on Behalf of the City.
FURTHER BE IT RESOLVED that the City Council of the City of Soledad approve the $225,000 expenditure in Fiscal Year 24/25 and direct Staff to include it in the Fiscal Year 24/25 Budget to be presented to the Council in June of 2024.
PASSED AND ADOPTED at a meeting of the City Council of the City of Soledad duly held on the 19th day of June 2024, by the following vote:
AYES, and in favor thereof, Councilmembers:
NOES, Councilmembers:
ABSENT, Councilmembers:
18 ABSTAIN, Councilmembers:
____________________________
ANNA M. VELAZQUEZ, Mayor
ATTEST:
____________________________
MEGAN HUNTER, City Clerk
19 EXHIBIT A
June 19, 2024
CONTRACT AMENDMENT NUMBER 2
TO THE CONTRACT TITLED:
CONSULTING SERVICES AGREEMENT BETWEEN THE CITY OF SOLEDAD AND CSG CONSULTANTS, INC.
On June 19, 2024, the City Council of the City of Soledad Adopted Resolution No. 6114 Approving a Contract Amendment No. 2 for Professional Services with CSG Consultants, Inc. for a total not exceed $225,000 to Provide Building Division Services, Stormwater Management Services, a Contract Building Official, and Other Related Services By This Amendment:
1. The Consulting Professional Services Agreement between the City of Soledad and CSG Consultants, Inc., dated July 6, 2022, and Amendment No. 1, dated June 21, 2023, is being amended to include services as described in the attached proposal, marked as Attachment A for an amounting to not exceed $225,000.
2. The term of the aforesaid agreement is extended from July 1, 2024, to December 31, 2024. (6-month extension)
3. Except for the abovementioned changes, all other provisions of the 2022 Agreement and Amendment No. 1 remain in full force and effect.
Megan Hunter
City Manager
Cyrus Kianpour, PE, PLS
President
City of Soledad CSG Consultants, INC.
20 550 Pilgrim Drive
Foster City, CA 94404
phone 650.522.2500
fax 650.522.2599
www.csgengr.com
FOSTER CITY | PLEASANTON | SAN JOSE | SACRAMENTO | NEWMAN | FRESNO | PASO ROBLES | ORANGE June 7, 2024
Kao Nou Yang
Community Development Director
City of Soledad
248 Main Street
Soledad, CA 93960
Re: Contract Extension
Dear Ms. Yang,
CSG Consultants (CSG) appreciates the opportunity to submit our proposal to renew our contract for a sixmonth period (07/01/2024 - 12/31/24) for building and engineering consultant services for the City of Soledad (City).
Scope of Services
CSG proposes to continue performing all requested services, including building plan review, building inspection, permit technician, fire inspection, engineering plan review, and stormwater plan review and inspection.
John LaTorra, CSG’s Regional Manager, will serve as the primary contact for this contract. His contact information is as follows:
John LaTorra, Regional Manager
cell (650) 208-4264 | [email protected]
Once a project is identified, Mr. LaTorra will work with CSG’s service managers to ensure the City receives timely responses. Crickett Brinkman will serve as the primary contact for all permit and plan review processing and oversees the Newman office where plans will be processed. Sandra Meditch, PE, will serve as the manager for engineering services.
Cost of Services
CSG will perform the requested services according to the hourly rates included herein. Services will be performed for a not to exceed amount of $225,000.
Please feel free to contact Mr. LaTorra with any questions you may have regarding our proposal and/or services. We greatly look forward to the opportunity to continue providing building and engineering services to the City of Soledad.
Sincerely,
Cyrus Kianpour, PE, PLS
President, CSG Consultants, Inc.
21 CSG CONTRACT EXTENSION
CITY OF SOLEDAD
2 FEE SCHED ULE
CSG’s fee schedule which includes fees for personnel providing the proposed scope of work is provided in the table below. We will coordinate the pickup and return of all plans via CSG staff or a licensed courier service.
Plan review based on a percentage of plan check fees includes initial plan review and two subsequent reviews. Additional reviews, deferred submittals, revisions and RFIs will be charged at the appropriate hourly rate below. RFIs for larger developments will be performed at an hourly rate, and turnaround times will be agreed upon in advance with the City.
PERSONNEL / REVIEW TYPE ALL INCLUSIVE FEE / HOURLY RATE
BUILDING SERVICES
Building Plan Review 75% of City’s Plan Check Fee
Structural Plan Review Only 50% of City’s Plan Check Fee Expedited Building Plan Review 95% of City’s Plan Check Fee Building Plan Review $137
CASp Plan Review/Consultation $147
Expedited Plan Review (Hourly) 1.5 x Hourly Rate
Building Official $146
Building Inspector $116
Permit Technician $78
FIRE PREVENTION SERVICES
Fire Plan Review 75% of City’s Plan Check Fees
Fire Plan Review (Hourly) $137
Fire Inspector $133
Overtime 1.5 x Hourly Rate
ENGINEERING PLAN REVIEW SERVICES
Principal Engineer $237
Senior Project Manager $226
Associate Engineer $182
Assistant Engineer $154
All hourly rates include salaries, benefits, workers compensation insurance, local travel, and miscellaneous office expenses. Should the scope of work change, or circumstances develop which necessitate special handling, CSG will notify the Agency prior to proceeding. Overtime services and services provided outside of normal business hours will be billed at 1.5x the applicable hourly rate. Depending on project size and scope, CSG’s percentage-based expedited plan review rate may be adjusted if mutually agreed upon between the Agency and CSG. Hourly rates for publicly funded projects will be based on current prevailing wage rates. On July 1 of each year following the contract start year, CSG will initiate an hourly rate increase based on change in CPI for the applicable region. CSG will mail an invoice every month for services rendered during the previous month. Unless otherwise agreed, payment terms are 30-days from receipt of invoice.
22 WWW.CSGENGR.COM
888.794.2016
CENTRAL COAST
• Paso Robles •
SOUTHERN CALIFORNIA
• Orange •
OFFICES
THROUGHOUT
CALIFORNIA
SAN FRANCISCO BAY AREA
• Foster City • San Jose • Pleasanton •
SACRAMENTO REGION
• Sacramento •
CENTRAL VALLEY
• Newman • Fresno •
23 SUBJECT: Resolution No. 6117, A Resolution of the City Council of the City of Soledad Approving a Consulting Services Agreement Task Order No. 3 in the Amount of $32,770 with Pavement Engineering Inc. for Engineering Support Services to Perform a Pavement Evaluation for the West Street Road Diet and Complete Streets Project and Authorize the City Manager to Execute Said Task Order on Behalf of the City of Soledad
TO: Honorable Mayor Velazquez and City Council
FROM: Donald Wilcox, Public Works Director, Alex Ramos, Assistant Engineer MEETING DATE: June 19, 2024
CITY OF SOLEDAD
STAFF REPORT
THROUGH: Megan Hunter, City Manager
AGENDA ITEM NO. 4.
Recommendation
It is recommended that the City Council of the City of Soledad Consider and Adopt Resolution No. 6117, “Approving a Consulting Services Agreement Task Order No. 3 in the Amount of $32,770 with Pavement Engineering Inc. for Engineering Support Services to Perform a Pavement Evaluation for the West Street Road Diet and Complete Streets Project and Authorizing the City Manager to Execute said Task Order on Behalf of the City of Soledad”.
Executive Summary
On August 31, 2023, the City of Soledad received an RSTP Competitive Grant in the amount of $2,758,000 for the West Street Road Diet and Complete Street Project. As part of this project, City Staff aims to improve the pavement condition along the West Street corridor to deliver a better project for the new proposed improvements and road diet. Due to the substantial amount of effort required to prepare a pavement evaluation report for the rehabilitation and reconstruction options for the West Street corridor, it is recommended that the City Council approve Task Order No. 3 with Pavement Engineering Inc.
Background
On August 31, 2023, the City of Soledad received an Award Notification from TAMC in the amount of $2,758,000 for the West Street Road Diet and Complete Streets Project as part of the Competitive Grant Program.
On March 6, 2024, the City Council approved a consulting services agreement with MNS Engineers, 24 Inc. for the design and construction management for the West Street Road Diet and Complete Streets Project in an amount not to exceed of $856,075. As part of this project, various improvements will be constructed to improve multimodal mobility for all types of roadway users on West Street between Front Street and Gabilan Drive. These improvements include but are not limited to, buffered bike lanes, a road diet, buffered bike lanes, pedestrian crossings, and marked crosswalks. This project will have funding to improve the pavement condition along the West Street corridor in the form of rehabilitation or reconstruction to deliver a better project and a major roadway with a longer lifespan.
Review & Analysis
As part of MNS’s proposal for the West Street Road Diet and Complete Street Project, work related to identifying the specific pavement treatment and therefore field-testing was not included to save cost. It requires a substantial amount of effort to perform field testing to determine the asphalt layer thickness and overall structural section condition throughout the corridor.
Additionally, the City of Soledad submitted an application for the Rubberized Pavement Grant Program 16th Cycle for Fiscal Year 2023-2024 to support the use of Rubberized Asphalt Concrete (RAC) products on one or more street maintenance projects. On February 8, 2024, the City received an award notification for the Rubberized Pavement Grant Program in the amount of $103,060 to be utilized in the Front Street Maintenance Project. To supplement funding for the pavement treatment for the West Street Project, Staff proposes to use the funds received through the Rubberized Pavement Grant Program to partially fund the pavement treatment for West Street in addition to Front Street and therefore requires an analysis of how much RAC along the West Street corridor can be utilized.
The City of Soledad regularly utilizes consulting services to help support facilitating projects to ensure successful project delivery. As a result, the City sought out formal Requests for Qualifications for Professional Engineering and Other Support Services. On November 2, 2022, under Resolution No. 5888, the Soledad City Council approved and established a new On-Call Consultant List to provide Professional and Engineering Support Services. The Public Works Department has since utilized the new On-Call Consultant List to support efforts to complete infrastructure upgrades, capital improvements, and other engineering-related projects.
Pavement Engineering Inc. (PEI) is on the City’s on-call consultant list and is qualified and familiar with the City’s streets through the Pavement Management Program Update, therefore Staff requested a proposal from PEI to perform a pavement evaluation to provide rehabilitation and reconstruction options for the West Street Corridor. PEI’s scope of work will include:
Task 1 – Pavement Evaluation Services
A. Deflection Testing and Coring
B. Native Soil Sample Collection to determine R-value
C. Deflection Analysis
D. Rehabilitation and Reconstruction Options
Task 2 – Provide Design Assistance
A. Design Approach for Plans and Specifications
B. Reviewing PS&E Package
City Staff reviewed the PEI proposal and recommends approval of the budget, scope, and schedule. The City’s Standard contractual forms will be used.
25 Resolution No. 6117
Exhibit A
Financial Considerations
The cost for services for this Task Order from PEI will be funded through the RSTP Competitive Grant.
Alternatives
Approve the resolution as presented; or
Reject the proposed resolution. This is not recommended as the Pavement Evaluation serves as a crucial component in the success of the West Street Road Diet and Complete Streets Project and staff does not have the capacity to undertake the task.
Planning/CEQA
The West Street Complete Street Project has been determined to be categorically exempt under the California Environmental Quality Act (CEQA) Guidelines in accordance with Title 14, Chapter 3, Article 19, Section 15301, Class 1 – Existing Facilities, Section 15302, Class 2 – Replacement or Reconstruction and Section 15303, Class 3 – New Construction or conversion of Small Structures.
Class 1 consists of minor alterations of existing facilities involving negligible or no expansion of use.
Class 2 involves the reconstruction of existing facilities with existing facilities involving negligible or no expansion of capacity. Class 3 consists of the construction of limited number of new, small facilities or structures. Funding would allow for the reconstruction of West Street, which is an existing facility, but with no changes to capacity.
Public Notice Requirements
None required.
Attachment(s):
26 RESOLUTION NO. 6117
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SOLEDAD APPROVING A CONSULTING SERVICES AGREEMENT TASK ORDER NO. 3 IN THE AMOUNT OF $32,770 WITH PAVEMENT ENGINEERING INC. TO PROVIDE
ENGINEERING SUPPORT SERVICES TO PERFORM A PAVEMENT EVALUATION
FOR THE WEST STREET ROAD DIET AND COMPLETE STREETS PROJECT AND
AUTHORIZE THE CITY MANAGER TO EXECUTE SAID TASK ORDER ON
BEHALF OF THE CITY OF SOLEDAD
WHEREAS, the City of Soledad received an Award Notification from TAMC for the RSTP Competitive Grant in the Amount of 2,758,000 for the West Street Road Diet and Complete Street Project; and
WHEREAS, on March 6, 2024, the City Council approved a consulting services agreement with MNS Engineers, Inc. for the design and construction management for the West Street Road Diet and Complete Streets Project to improve multimodal mobility for all types of roadway users along the West Street corridor between Front Street and Gabilan Drive; and WHEREAS, MSN’s proposal for the West Street Road Diet and Complete Streets Project did not include identification of the specific pavement treatment and related field-testing to determine the asphalt layer thickness and overall structural section condition throughout the corridor; and
WHEREAS, the City does not have the sufficient internal staff to perform the pavement evaluation work referenced above along the West Street corridor between Front Street and Gabilan; and
WHEREAS, Pavement Engineering Inc. (PEI) is on the City’s on-call consultant list and is qualified and familiar with the City’s streets through the Pavement Management Program Update, therefore staff requested a proposal from PEI l to perform a pavement evaluation to provide rehabilitation and reconstruction options for the West Street Corridor; and WHEREAS, City Staff has reviewed the proposal and recommends approval of the budget scope and schedule included in the PEI proposal; and
WHEREAS, the West Street Complete Street Project has been determined to be categorically exempt under the California Environmental Quality Act (CEQA) Guidelines in accordance with Title 14, Chapter 3, Article 19, Section 15301 Class 1, Section 15302 Class 2, and Section 15303 Class 3; and
WHEREAS, the cost for services for this Task Order will be funded through the RSTP Competitive Grant awarded to the City in 2024.
NOW THEREFORE BE IT RESOLVED, by the City Council of the City of Soledad, that the consulting services agreement task order between the City of Soledad and Pavement 27 Engineering Inc. for engineering support services in the not to exceed amount of $32,175, and a copy of the task order with the proposal with Pavement Engineering Inc., attached “Exhibit A” and by reference incorporated herein, is hereby approved and the City Manager is hereby authorized and directed to execute the same on the behalf of the City of Soledad.
PASSED AND ADOPTED by the City Council of the City of Soledad at a regular meeting duly held on the 19th day of June 2024 by the following vote:
AYES, and in favor thereof, Councilmembers:
NOES, Councilmembers:
ABSENT, Councilmembers:
ABSTAIN, Councilmembers:
ANNA M. VELAZQUEZ, Mayor
ATTEST:
MEGAN HUNTER, City Clerk
28 PAVEMENT ENGINEERING INC.
TASK ORDER FOR PROFESSIONAL SERVICES
Task Order No. 3
1. Pursuant to the Non-Exclusive Consulting Services Agreement for on-call engineering services Dated February 1, 2023 (“Agreement”) between the City of Soledad (“City”) and Pavement Engineering Inc. (“Consultant”) City hereby requests that Consultant provide services for the following Project: Proposal for Pavement Evaluation Services for the West Street Road Diet and Complete Streets Project
2. Consultant shall provide the following services: See Attached Proposal.
3. Consultant services for the project are to commence on June 19, 2024.
4. Consultant shall be compensated for its services for the project as follows: See Attached Proposal ($32,770).
City and Consultant agree to the terms and conditions of this Task Order, and upon execution of this Task Order by both parties, this Task Order shall be approved, subject to all terms and conditions contained therein and in the Agreement, and this Task Order shall be appended to and become a part of the Agreement. To the extent there may be a conflict between the consultant proposal terms and the agreement, the City’s agreement language prevails.
City of Soledad
_________________________________
By: Megan Hunter
Date: _____________________________
Pavement Engineering Inc.
_______________________________
By: ___________________________
Date: __________________________
Exhibit A
29 SUBJECT: Resolution No. 6118, A Resolution of the City Council of the City of Soledad Accepting the Dixi Street Sewer and Water Replacement Improvements, City Project No. W22-7 & WW22-03 Project as Complete by Anderson Pacific Engineering Construction, Inc. and Authorizing the Release of Retention in the Amount of $90,574.81 TO: Honorable Mayor Velazquez and City Council
FROM: Donald Wilcox, Public Works Director, Alex Ramos, Assistant Engineer MEETING DATE: June 19, 2024
CITY OF SOLEDAD
STAFF REPORT
THROUGH: Megan Hunter, City Manager
AGENDA ITEM NO. 5.
Recommendation
It is recommended that the City Council of the City of Soledad Consider and Adopt Resolution No. 6118, “Accepting the Dixi Street Sewer and Water Replacement Improvements, City Project No. W22- 7 & WW22-03 Project as Complete by Anderson Pacific Engineering Construction, Inc. and Authorizing the Release of Retention in the Amount of $90,574.81”.
Executive Summary
Work done by Anderson Pacific Engineering Construction, Inc. (APEC) has been completed and inspected. Staff is therefore recommending that the Dixi Street Sewer and Water Replacement Improvements, City Project No. W22-07 & WW22-03 Project be accepted, and that the City release the retention payment to APEC.
Background
The City of Soledad received $6,285,000 from the American Rescue Plan Act of 2021 stimulus package distributed to local governments throughout the United States with strict guidelines on the use and timeframe of the funds needed to be expended. On December 15, 2021, Staff presented to the City Council a list of Public Works infrastructure projects and proposed allocating $4 million to complete these projects which was thereafter approved by the City Council.
As part of the presented project list taken to Council, the Dixi Street Sewer and Water Replacement Improvements, City Project No. W22-7 & WW22-03 Project (Dixi Street Project) was identified to be a priority project and eligible for ARPA funding.
Staff requested a design proposal from two firms on the on-call list. On March 3, 2021, the City Council 30 approved a proposal for professional services with Yamabe & Horn Engineering, Inc. in an amount not to exceed $38,000 for Civil Engineering Design for the Dixi Street Project.
Staff then prepared and formally advertised through Planet Bids a formal request for bids for the Dixi Street Sewer and Water Replacement Project. The bid was posted on April 1, 2022, and had a bid close date of April 27, 2022. The City received a total of five (5) bids, with APEC being the lowest responsive bidder.
On May 18, 2022, City Council approved a contract for construction services with APEC in an amount of $1,171,850 with a 10% contingency for the Dixi Street Project.
Review & Analysis
During the construction phase of this project, some modifications were made to the agreement to reflect the needs of the project in a total of seven (7) contract change orders (CCO):
$1,171,850 Total Amount of Contract Approved
+$45,779.98 CCO 1 – Additional potholing to an unforeseen utility conflict and associated costs +$168,200.00 CCO 2 – Waterline Revision (Moving Waterline Alignment) +$44,490.00 CCO 3 – Demo and replacement of Storm drain inlets and pipe at Dixi/Monterey +$122,515.00 CCO 5 – Installation of five ADA curb ramps along Dixi Street +$54,985.00 CCO 6 – HMA Leveling Course to prevent cracks and deformation on Dixi Street. +$39,753.07 CCO 7 – Remaining T&M Work for the Sewer, Water, and Miscellaneous Work. $1,647,573.05 Total Construction Cost
Contract Change Order 4 was not included in the total construction cost for the Dixi Street project as the work performed under CCO 4 was for the delivery and placement of the Asphalt Grindings at the Water Reclamation Facility (WRF). Therefore, funding of CCO 4 was not through ARPA but the Wastewater Operations Fund.
Public Works Staff has inspected and reported that the Dixi Street Sewer and Water Replacement Improvements are completed by the project documents and all work performed by APEC is now complete. Therefore, Staff is recommending that the City accept the project as complete and release retention.
Financial Considerations
This project was funded by the American Rescue Plan Act (ARPA) and under Resolution No. 5949 allocated an additional $150,000 in contingency to cover contract change orders. The remaining contingency balance of $92,301 shall cover the retention payment for this project.
Alternatives
Approve the resolution as presented; or
Reject the proposed resolution.
Planning/CEQA
This project is categorically exempt under Section 15302 – Replacement or Reconstruction Class 2(c) Replacement or reconstruction of existing utility systems and/or facilities involving negligible or no expansion of capacity. This project meets the negligible qualifying criteria provided under CEQA Guidelines Section 15302.
31 Resolution No. 6118
Public Notice Requirements
None required.
Attachment(s):
32 RESOLUTION NO. 6118
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SOLEDAD
ACCEPTING THE DIXI STREET SEWER AND WATER REPLACEMENT
IMPROVEMENTS, CITY PROJECT NO. W22-7 & WW22-03 PROJECT AS COMPLETE BY ANDERSON PACIFIC ENGINEERING CONSTRUCTION, INC. AND AUTHORIZING THE RELEASE OF RETENTION IN THE AMOUNT OF $90,574.81 WHEREAS, the City of Soledad received $6,285,000 from the American Rescue Plan Act (ARPA) of 2021 stimulus package distributed to local governments throughout the United States with strict guidelines on the use and timeframe of the funds needed to be expended; and WHEREAS, on December 15, 2021, Staff presented to the City Council a list of Public Works infrastructure projects and proposed allocating $4 million to complete these projects which was thereafter approved by the City Council ; and
WHEREAS, as part of the presented project list taken to City Council, the Dixi Street Sewer and Water Replacement Improvements, City Project No. W22-7 & WW22-03 Project (Dixi Street Project) was identified to be a priority project and eligible for ARPA funding; and WHEREAS, on March 3, 2021, the City Council approved a proposal for professional services with Yamabe & Horn Engineering, Inc. in an amount not to exceed $38,000 for Civil Engineering Design for the Dixi Street Project; and
WHEREAS, Staff prepared and formally advertised through Planet Bids the Dixi Street Project and the City received a total of five (5) bids; and WHEREAS, Anderson Pacific Engineering Construction, Inc. (APEC) was the lowest responsive bidder, and on May 18, 2022, Council approved a contract for construction services with APEC in an amount of $1,171,850 with a 10% contingency for the Dixi Street Project; and WHEREAS, during the construction phase of this project, some modifications were made to the agreement to reflect the needs of the project in a total of seven (7) contract change orders for a total construction cost of $1,647,573.05; and
WHEREAS, Public Works Staff has inspected and reported that the Dixi Street Sewer and Water Improvements are completed by the project documents and all work performed by APEC is now complete, therefore, Staff is recommending that the City accept the project as complete and release retention in the amount of $90,574.81.
NOW THEREFORE BE IT RESOLVED, by the City Council of the City of Soledad, that Dixi Street Project Sewer and Water Improvements are hereby accepted and the release of the agreement retention payment to APEC is hereby authorized.
PASSED AND ADOPTED by the City Council of the City of Soledad at a regular meeting duly held on the 19th day of June 2024 by the following vote:
33 AYES, and in favor thereof, Councilmembers:
NOES, Councilmembers:
ABSENT, Councilmembers:
ABSTAIN, Councilmembers:
ANNA M. VELAZQUEZ, Mayor
ATTEST:
MEGAN HUNTER, City Clerk
34 SUBJECT: Resolution No. 6110, A Resolution of the City Council of the City of Soledad Amending the City's Conflict of Interest Code
TO: Honorable Mayor Velazquez and City Council
FROM: Mike Rodriquez, City Attorney
MEETING DATE: June 19, 2024
CITY OF SOLEDAD
STAFF REPORT
THROUGH: Megan Hunter, City Manager
AGENDA ITEM NO. 6.
Recommendation
It is recommended that the City Council consider and adopt Resolution No.6110, “Amending the City’s Conflict of Interest Code.”
Executive Summary
The Political Reform Act requires every local government agency to review its Conflict of Interest Code biennially to determine if it is accurate or, alternatively, that the Code must be amended. The Code identifies the City positions/classifications subject to the State Conflict of Interest Code and lists the type of information that must be disclosed by all designated parties. Changes to the Code are usually only required when the City has had a change in positions or classifications. While changes to the Code have not been necessary for several cycles, a number of changes in designation require Code updating in 2024. Staff has prepared a revised Conflict of Interest Code as reflected in the attached Resolution for City Council consideration and adoption.
Background
The Political Reform Act requires every local government agency to review its Conflict of Interest Code biennially to determine if it is accurate or, alternatively, that the Code must be amended. Once the determination has been made, a notice must be submitted to the Code reviewing body no later than October 1 of even-numbered years. The City Council is the Code reviewing body for the City.
Attachment A to this Staff Report is a copy of the City Clerk’s 2024 Local Agency Biennial Notice which indicates that an amendment to the Conflict of Interest Code is required.
Review & Analysis
The City Council initially adopted a Conflict of Interest Code by way of Resolution No. 1222. On December 4, 1996, the City Council adopted an updated Conflict of Interest Code via Resolution No. 2551 and rescinded the previous Resolution No. 1222. Amendments to the Code were adopted by way of Resolution No. 3426 on March 3, 2004; December 3, 2008 via Resolution No. 4314; August 4, 2010 35 via Resolution No. 4551; August 1, 2012 via Resolution No. 4799; July 2, 2014 by Resolution No. 4991 and on September 5, 2018 by Resolution No. 5440. A determination was made in 2016, 2020 and 2022 that no Code amendment was required.
Since the last revision on September 5, 2018, there have been changes to the status of several positions in the City, thus necessitating amendments to the Code. The revised Code will delete the position of Building Official, which no longer exists, and add the position of Parks and Recreation Director.
The proposed Appendix A reflects the City positions/classifications subject to the Conflict of Interest Code. Appendix B lists the disclosure categories. To bring the City of Soledad into conformance, Staff recommends that the City Council adopt a revised Conflict of Interest Code as reflected in the attached Resolution with accompanying Appendices A and B.
Financial Considerations
None.
Alternatives
Adopt the proposed Resolution
Do not amend the Conflict of Interest Code at this time.
Modify the Resolution
Planning/CEQA
The City has determined that adoption of the revised Conflict of Interest Code is not considered a project for the purposes of CEQA since it has no potential for resulting in either a direct or indirect impact to the environment. (See CEQA Guidelines Section 15378.) Public Notice Requirements
None required.
36 SUBJECT: Resolution No. 6011, A Resolution of the City Council of the City of Soledad ELECTIONS
TO: Honorable Mayor Velazquez and City Council
FROM: Mike Rodriquez, City Attorney
MEETING DATE: June 19, 2024
CITY OF SOLEDAD
STAFF REPORT
THROUGH: Megan Hunter, City Manager
AGENDA ITEM NO. 7.
Recommendation
Executive Summary
Background
Review & Analysis
Financial Considerations
Alternatives
Planning/CEQA
Public Notice Requirements
37 SUBJECT: Resolution No. 6119, a Resolution of the City Council of the City of Soledad Accepting a List of Projects Funded By SB 1: The Road Repair and Accountability Act for Fiscal Year 2024/2025
TO: Honorable Mayor Velazquez and City Council
FROM: Donald Wilcox, Public Works Director, Alex Ramos, Assistant Engineer MEETING DATE: June 19, 2024
CITY OF SOLEDAD
STAFF REPORT
THROUGH: Megan Hunter, City Manager
AGENDA ITEM NO. 8.
Recommendation
It is recommended that the City Council of the City of Soledad Consider and Adopt Resolution No. 6119, “Accepting a List of Projects Funded by SB 1: The Road Repair and Accountability Act for Fiscal Year 2024/2025”.
Executive Summary
Senate Bill 1 (SB 1) is a funding opportunity apportioned by formula to eligible cities and counties for basic road maintenance, rehabilitation, and safety projects. To be eligible to receive SB1 funding, the City needs to develop and submit a list of projects and a project expenditure report and satisfy reporting requirements for the California Transportation Commission each fiscal year before their respective deadlines. In addition, SB1 requires a resolution from the City Council adopted during a regular public council meeting attached to the submittal list of projects by the deadline of July 1st. Although the Council previously approved a resolution on June 5, 2024, Staff is bringing a new resolution for Council consideration and approval with modifications requested by the California Transportation Commission.
Background
Senate Bill 1 (SB 1), which is known as the Road Repair and Accountability Act of 2017, provides additional funding through a combination of taxes and fees to address basic road maintenance, rehabilitation, and critical safety needs on the State’s roadway network. To receive RMRA funding each year, cities and counties must submit a list of projects to the California Transportation Commission (CTC). The project list must be accompanied by evidence of inclusion in an adopted budget. This staff report is meant to provide the required project and budgetary information needed to satisfy the funding and reporting requirements.
38 Review & Analysis
Staff originally brought this item to the Council for approval on June 5, 2024, at a regular public council meeting. However, after submitting the adopted resolution and proposed project list to the California Transportation Commission, Staff was informed that the Resolution had to be modified to reflect the specific locations in which work is to be performed if the project has been identified to be in the construction phase.
The FY 24/25 Crack Seal Project is the only project currently in the proposed project submittal list to be in the construction phase and will be updated in the resolution to reflect the street locations. Due to the number of streets the FY 24/25 Crack Seal Project plans to address, the project location description shall refer to the Crack Seal Map attached as “Exhibit A”. The FY 24/25 Slurry Seal Project is still in the pre-construction phase and requires plans, specifications, and estimates (PS&E) before moving toward construction and is fine to remain as is.
All proposed projects must be included in a city or county budget that is adopted by the city council or board of supervisors at a regular public meeting. The Capital Improvement Program (CIP) for FY 25- 28 shall have said project(s) programmed for the subsequent years once approved. The estimated revenue increases from SB 1 will be accounted for in Fund 212, “Gas Tax”, as the new RMRA funds will be distributed to the City in much the same way that the Gas Tax revenues currently are. Projects to be funded from Gas Tax revenues will also be shown in the CIP report. The following project(s) will be funded all or in part by the RMRA funding, which is estimated at $714,879 for fiscal year 24/25.
Fiscal Year 24/25 Street Maintenance Projects (Crack Seal & Slurry Seal) - $714,879 Financial Considerations
This is revenue that comes from the State to the City of Soledad to rehabilitate failed roads and add useful life span to those sections. The use of this funding for street maintenance will be reflected in the FY 24/25 budget.
Alternatives
Approve the resolution as presented; or
Reject the proposed resolution. This is not recommended because the City would be ineligible to receive additional revenue for street maintenance.
Planning/CEQA
The proposed action is not a project as defined by the California Environmental Quality Act (CEQA) (CEQA Guidelines Section 15378). Because the matter does not cause a direct or foreseeable indirect physical change on or in the environment, this matter is not a project. Any subsequent discretionary projects resulting from this action will be assessed for CEQA applicability.
Public Notice Requirements
None required.
Attachment(s):
39 Resolution No. 6119
Exhibit A - Crack Seal Map Street Locations
40 RESOLUTION NO. 6119
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SOLEDAD TO ACCEPT A LIST OF PROJECTS FUNDED BY SB 1: THE ROAD REPAIR AND
ACCOUNTABILITY ACT OF 2017 FOR FISCAL YEAR 2024/2025
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April 2017 to address the significant multi-modal transportation funding shortfalls statewide; and
WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of the City of Soledad are aware of the projects proposed for funding in our community, which projects have been completed each fiscal year; and WHEREAS, the City of Soledad must include a list of all projects proposed to receive funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, in the City budget, which must include a description and the location of each proposed project, a proposed schedule for the project’s completion, and the estimated useful life of the improvement; and
WHEREAS, the City will receive an estimated $714,879 in RMRA funding in Fiscal Year 2024-2025 from SB 1; and
WHEREAS, maintaining and preserving the local street and road system in good condition will reduce drive times and traffic congestion, improve bicycle safety, and make the pedestrian experience safer and more appealing, which leads to reduced vehicle emissions, helping the State achieve its air quality and greenhouse gas emissions reductions goals; and WHEREAS, restoring roads before they fail also reduces construction time, which results in less air pollution from heavy equipment and less water pollution from site run-off; and WHEREAS, the SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting-edge technology, materials, and practices will have significant positive co-benefits statewide.
NOW THEREFORE BE IT RESOLVED that the City Council of the City of Soledad finds as follows:
1. All of the recitals set forth above are true and correct to the best of its knowledge and are incorporated herein.
2. The non-enterprise capital improvement program (CIP) budget for Fiscal Year 2024-25 will incorporate the following list of projects planned to be funded with Road Maintenance and Rehabilitation Account revenues:
41 Project Title Project Description Project
Location
Estimated
Useful Life
Anticipated
Year of
Construction
FY 24/25 – Crack
Seal Project
To perform a Crack Seal
Project on eligible streets
and add useful life span
to those sections.
Please see the
attached map
for street
locations herein
referenced as
“Exhibit A.”
5 years Fiscal Year
2024/2025
FY 24/25 – Slurry
Seal Project
To perform a light
maintenance project in
the form of a slurry seal
on eligible streets,
dependent on the design
and cost estimates.
Locations are to
be determined
during the preconstruction
phase of this
project.
10 Years Fiscal Year
2024/2025
BE IT FURTHER RESOLVED, that Resolution No. 6099, adopted by the City Council at a regular meeting on June 5, 2024, is hereby rescinded in its entirety.
PASSED AND ADOPTED by the City Council of the City of Soledad at a regular meeting duly held on the 19th day of June 2024 by the following vote:
AYES, and in favor thereof, Councilmembers:
NOES, Councilmembers:
ABSENT, Councilmembers:
ABSTAIN, Councilmembers:
ANNA M. VELAZQUEZ, Mayor
ATTEST:
MEGAN HUNTER, City Clerk
42 2024 Crack Seal Project 2024 Form NOTICE INVITING BIDS T23-02
LOCATION MAP
City of Soledad, California
43 SUBJECT: Resolution Nos. 6105, 6106, 6107, 6108 & 6109, Resolutions of the City Council of the City of Soledad Ordering the Levy and Collection of Assessments for Various Districts for Fiscal Year 2024/2025 TO: Honorable Mayor Velazquez and City Council
FROM: Donald Wilcox, Public Works Director, Leon Gomez, Interim City Engineer
MEETING DATE: June 19, 2024
CITY OF SOLEDAD
STAFF REPORT
THROUGH: Megan Hunter, City Manager
AGENDA ITEM NO. 1.
Recommendation
Staff Report
Open hearing to the public for each Assessment District:
Diamond Ridge (MAD and BAD)
Orchard Villas (MAD and BAD)
Rancho San Vicente (MAD only)
Close hearing to the public for each Assessment District:
Diamond Ridge (MAD and BAD)
Orchard Villas (MAD and BAD)
Rancho San Vicente (MAD only)
Council discussion
Council Action
It is recommended that the City Council consider and adopt the following Resolutions of the City Council of the City of Soledad:
a. Resolution No. 6105, Ordering the Levy and Collection of Assessments Within the Diamond Ridge Benefit Assessment District No. 1 (Diamond Ridge, Phase I) for Fiscal Year 2024/2025. b. Resolution No. 6106, Ordering the Levy and Collection of Assessments Within the Diamond Ridge Parks and Open Space Maintenance Assessment District No. 1 (Miravale I, Phase I) for Fiscal Year 2024/2025.
c. Resolution No. 6107, Ordering the Levy and Collection of Assessments Within the Parks and Open Space Maintenance Assessment District No. 1, Annexation No. 1 (Orchard Villas/Miravale II) for Fiscal Year 2024/2025.
d. Resolution No. 6108, Ordering the Levy and Collection of Assessments Within the Benefit Assessment District No. 2 (Orchard Villas/Miravale II) for Fiscal Year 2024/2025. 44 e. Resolution No. 6109, Ordering the Levy and Collection of Assessments Within the Rancho San Vicente Parks and Open Spaces Maintenance Assessment District for Fiscal Year 2024/2025.
Executive Summary
The City of Soledad has five Assessment Districts formed to levy and collect assessments against the lots or parcels of land within such districts to pay for the costs and expenses of operating, maintaining, and servicing improvements and facilities located within public places within the districts’ boundaries.
All five Assessment Districts' proposed levies are generally following FY 23/24's patterns, and as such, the respective increases of the proposed assessments are due to the 3% annual adjustment for Rancho San Vicente-CHISPA and by CPI inflation adjustments for three of the other four districts.
Consideration of resolutions approving the annual levy and collection of assessments is before the Council this evening.
Background
In 2003, the City Council of the City of Soledad formed the Diamond Ridge Benefit Assessment District No. 1 (Diamond Ridge, Phase I); Diamond Ridge Parks and Open Space Maintenance Assessment District No. 1 (Miravale I, Phase I); and the Rancho San Vicente Parks and Open Space Maintenance Assessment District. In 2006 the Council formed the Parks and Open Space Maintenance Assessment District No. 1, and the Annexation No. 1 (Orchard Villas/Miravale II); Benefit Assessment District No. 2 (Orchard Villas/Miravale II). In January 2022 the Council approved the Liberty Court Annexation to the Parks and Open Space Maintenance Assessment District No. 1 (Orchard Villas/Miravale II) and also to the Benefit Assessment District No. 2 (Orchard Villas/Miravale II). All of these Districts were formed to levy and collect assessments against the lots or parcels of land within such districts to pay for the costs and expenses of operating, maintaining, and servicing improvements and facilities located within public places within the boundaries of the Districts.
Each year the City is required to approve an updated Engineer’s Annual Levy Report for the District that describes the District and the proposed levy and collection of assessments upon eligible parcels of land within the District. This report is presented at a public hearing to give the public an opportunity to comment.
Review & Analysis
With the formation of the various districts, as approved by the property owners pursuant to a mailed ballot election conducted in accordance with Article XIII D of the California Constitution, the City Council in subsequent fiscal years thereafter has the ability to impose the initial maximum assessment rate that was established at the year of formation which can be adjusted on an annual basis by the Consumer Price Index (CPI) of the San Francisco-Oakland-Hayward area. Notwithstanding the fact that the maximum assessment rate is adjusted on an annual basis, the maximum assessment is not always assessed on all or any of the properties within a given district, and in some cases, where a district has been formed prior to the time that all of the involved public improvements have been constructed, properties may be assessed with a minimal assessment simply to cover administrative costs.
The City Council must order, by Resolution, to levy and collect assessments against the assessable lots and parcels of land within each District for that portion of the fiscal year commencing July 1, 2024, and ending June 30, 2025 to pay applicable operating, maintenance and service costs and expenses of identified improvements.
45 On May 15, 2024, the City Council approved Resolution Nos. 6082 and 6083 setting the public hearing and preliminarily approving the Engineer’s Annual Levy Report for the Diamond Ridge Benefit Assessment District No. 1 (Diamond Ridge Phase 1) and Diamond Ridge Parks and Open Space Maintenance Assessment District No. 1 (Miravale 1, Phase 1). The public hearing was set for June 19, 2024.
On May 15, 2024, the City Council approved Resolution No. 6086 setting the public hearing and preliminarily approving the Engineer’s Annual Levy Report for the Rancho San Vicente Parks and Open Spaces Maintenance Assessment District. The public hearing was set for June 19, 2024.
On May 15, 2024, the City Council approved Resolution Nos. 6084 and 6085 setting the public hearing and preliminarily approving the Engineer’s Annual Levy Report approved the Parks and Open Space Maintenance Assessment District No. 1, Annexation No. 1 (Orchard Villas/Miravale II) and Benefit Assessment District No. 2 (Orchard Villas/Miravale II). The public hearing was set for June 19, 2024.
The attached resolutions, if approved, will provide final approval of the Engineer’s Annual Levy Report for each district, authorize the levy and collection of said assessments and order the maintenance, operating and/or servicing of the improvements identified in each Engineer’s Annual Levy Report. It is worth noting that the Engineer’s Annual Levy Reports establish both a “recommended” Fiscal Year 2024-2025 assessment as well as the “maximum” Fiscal Year 2024-2025 assessment for each parcel in each district.
Consideration and action on the five (5) resolutions should only be taken after public hearings on said matters have been completed. Once the resolutions are approved, Staff will forward the documents to the County so that the assessments can be paid through the property tax roll system.
The table below shows a summary of the maximum allowable assessments, recommended Fiscal Year (“FY”) 2024-2025 assessments and previous year’s assessments. Preliminary Annual Engineer’s Reports for each District are available for review in the City Clerk’s Office. On behalf of the City, DTA reviewed all the City’s maintenance and benefit assessment districts’ fund balances and has recommended the following assessments for each of the districts for Fiscal Year 2024/2025:
City of Soledad
Historical MAD and BADYearlyAssessment per EDU
FUND Description Short Description
FY24/25
Maximum
Assessment
Allowable
RatesApplied Per EDU
1 FY
2 24/25
FY
23/24
FY
22/23
FY
21/22
FY
20/21
FY
19/20
FY
18/19
647 Rancho San Vicente-CHISPA San Vicente $819.66 $819.66 $795.79 $772.61 $750.11 $728.26 $707.05 $686.46 649 Diamond RidgeAssessment PH
1 BAD #1 $490.68 $255.68 $243.08 $238.10 $223.39 $211.31 $201.24 $151.72 650 Diamond RidgeAssessment
Parks MAD#1 $475.14 $475.14 $457.89 $439.47 $418.56 $403.21 $398.78 $209.08 651 Miravale Orchard Landscaping
MAD #1,
Annex No. 1
$1,360.87 $610.57 $649.76 $676.15 $625.75 $595.95 $567.57 $548.22 652 Miravale Orchard Benefit BAD #2 $281.16 $281.16 $274.66 $260.84 $247.96 $244.13 $237.24 $229.16 [1] Rates are only applied, and do not reflect approved MaximumAssessment Rates. [2] Levy for FY24/25 isthe Proposed Rate per EDU (Equivalent Dwelling Unit).
All five Assessment Districts' proposed levies are generally following FY 23/24's patterns; and, as such, the respective increases of the proposed assessments are due to the 3% annual adjustment for 46 Rancho San Vicente - CHISPA and by CPI inflation adjustments for three of the other four districts.
The total assessment intended to be collected for the Rancho San Vicente Parks and Open Spaces Maintenance Assessment District is $819.66 per lot. Funds collected for this assessment are used for park maintenance, street landscaping, parkway water charges, park water charges, park electrical charges, sound wall maintenance, street lighting electrical and replacement.
The total assessment intended to be collected for the Diamond Ridge Benefit Assessment District No. 1 (Diamond Ridge, Phase I) is $255.68 per lot. Funds collected for this assessment are to be used for routine maintenance and dredging of the percolation pond, street sweeping, storm drain repair and maintenance, engineering plans and specifications, inspection and overhead.
The total assessment intended to be collected for the Diamond Ridge Parks and Open Spaces Maintenance District No. 1 (Miravale I, Phase I) is $475.14 per lot. Funds collected for this assessment are to be used for maintenance of the parks, playgrounds, streets and landscaping, street landscape water charges, park water charges, park electrical charges, planter wall maintenance, sound wall replacement and painting, street lighting electrical and replacement.
The total assessment intended to be collected for the Parks and Open Space Maintenance Assessment District No. 1 (Orchard Villas/Miravale II) is $610.57 per lot, a reduction from last year. Funds collected for this assessment are to be used for maintenance of the parks, streets and landscaping, street landscape water charges, park water charges, park electrical charges, planter wall maintenance, sound wall replacement and painting, street lighting electrical and replacement. The assessment reduction is due to the addition of new parcels within the District, which results in total costs being spread over a greater number of parcels than in the preceding year.
The total assessment intended to be collected for the Benefit Assessment District No. 2 (Orchard Villas/Miravale II) is $281.16 per lot. Funds collected for this assessment are used for routine maintenance such as street sweeping, repairs, replacement, electric current, supervision, debris removal, pest abatement, engineering and inspection, and any other items of work necessary and incidental for the proper maintenance and operation.
DTA has prepared and filed a Final Engineer’s Report (“Report(s)”) for each District and recommends funding each District with the assessments shown in the table above. The Reports are available in the City Clerk’s office for review.
Financial Considerations
All costs incurred by the City in the preparation and administration of the involved assessment districts will be charged against each district and paid by affected property owners. The costs include all maintenance as well as costs to service the districts including City administration, required engineer’s reports, contingency reserves and the County fee. The total collected and anticipated to be expended in the 2024-2025 year per district is listed below:
$109,834.44 647 - Rancho San Vicente
$88,720.91 649 - Diamond Ridge BAD
$164,873.58 650 - Diamond Ridge MAD
$338,990.80 651 - Miravale Orchard MAD
$156,098.78 652 - Miravale Orchard BAD
$820,805.26 Total Assessed and Collected
47 Assessment_District_Map
1. Resolution No. 6105 and Engineer Report - BAD Diamond Ridge No. 1 Levy FY24-25
2. Resolution No. 6106 and Engineer Report - MAD Diamond Ridge No. 1 Levy FY24-25
3. Resolution No. 6107 and Engineer Report - MAD Orchard Villa-Miravalle II Levy FY24-25
4. Resolution No. 6108 and Engineer Report - BAD Orchard Villas-Miravale II Levy FY24-25
5. Resolution No. 6109 and Engineer Report - MAD Rancho San Vicente Levy FY24-25
Alternatives
Adopt the recommended resolutions.
Do not approve the attached resolutions; this alternative is not recommended as the City does not have funding to provide the services needed without these Assessments.
Planning/CEQA
The City has determined that ordering to levy and collect annual assessments is exempt from provisions of the California Environmental Quality Act (Public Resources Code Section 21000 et seq.) pursuant to State CEQA Guidelines, Sections 15061, subd. (b)(3) and 15273. The amendments adjust District fees that are used to meet District operating expenses and have no possibility of causing significant environmental effects.
Public Notice Requirements
The Public Hearing Notice for all five districts was published on May 29, 2024 in the Salinas Valley Tribune.
Attachment(s):
48 REASSESSMENT DISTRICT -
NO. 2000-01
(THE VINEYARDS) IMPROVEMENT BONDS
April 2022
49 DRAFT – FOR REVIEW
RESOLUTION NO. 6105
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SOLEDAD
ORDERING THE LEVY AND COLLECTION OF ASSESSMENTS WITHIN THE DIAMOND RIDGE BENEFIT ASSESSMENT DISTRICT NO. 1 (DIAMOND RIDGE, PHASE I) FOR FISCAL YEAR 2024/2025
The City Council of the City of Soledad, California (hereinafter referred to as the “City”) does resolve as follows:
WHEREAS, the City Council has by previous Resolutions initiated proceedings and declared its intention to levy assessments for the Diamond Ridge Benefit Assessment District No. 1 (hereafter referred to as the “District”) for the fiscal year commencing July 1, 2024 and ending June 30, 2025 pursuant to the provisions of the Benefit Assessment Act of 1982, Chapter 6.4 of Part 1 of Division 2, Article 4 of the Government Code of California, beginning with Section 54703 (hereafter referred to as the "Act") to pay the costs and expenses of operating, maintaining, and servicing improvements and facilities located within public places within the boundaries of the District; and,
WHEREAS, DTA has prepared and filed with the City Clerk, and the City Clerk has presented to the Council, the Engineer’s Annual Levy Report (hereafter referred to as the “Report”) for the District that describes the District and the proposed levy and collection of assessments upon eligible parcels of land within the District, and the Council did by previous Resolution give preliminary approval of said Report; and,
WHEREAS, the City Council desires to levy and collect assessments against parcels of land within the District for the fiscal year commencing July 1, 2024 and ending June 30, 2025 to pay the costs and expenses of operating, maintaining, and servicing improvements and facilities located within the boundaries of the District; and,
WHEREAS, this City and DTA have reviewed the provisions of Section XIIID of the California State Constitution and found that the proposed assessments comply with these provisions.
NOW, THEREFORE, BE IT RESOLVED, DETERMINED, AND ORDERED BY
THE CITY COUNCIL OF THE CITY OF SOLEDAD FOR THE DIAMOND RIDGE BENEFIT ASSESSMENT DISTRICT NO. 1 AS FOLLOWS:
Section 1 Following notice duly given, the City Council has held a full and fair Public Hearing regarding the District, the levy and collection of assessments, the Report prepared in connection therewith, and considered all oral and written statements, protests, and communications made or filed by interested persons regarding these matters.
Section 2 Based upon its review (and amendments, as applicable) of the Report, the City Council hereby finds and determines that:
i) the land within the District will receive special benefit by the operation, maintenance, and servicing of improvements and facilities located in public places within the boundaries of the District; and,
50 DRAFT – FOR REVIEW
ii) the District includes all of the lands so benefited; and, iii) the net amount to be assessed upon the lands within the District in accordance with the fee for the fiscal year commencing July 1, 2024 and ending June 30, 2025 is apportioned by a formula and method which fairly distributes the net amount among all eligible parcels in proportion to the estimated benefits to be received by each parcel from the improvements and services. This Fiscal Year assessment for the Diamond Ridge Benefit Assessment District No.1 is $255.68 per parcel.
Section 3 The Report and assessments as presented to the City Council and on file in the Office of the City Clerk are hereby confirmed as filed and approved by the City Council.
Section 4 The maintenance, operation, and servicing of the improvements and appurtenant facilities shall be performed pursuant to the Act. The City Council hereby orders the proposed improvements to be made, which improvements are briefly described as follows: the maintenance and operation of the following described improvements of a local nature on public lands within said District including street sweeping, storm drain lines, storm retention pond silt removal, bank stabilization and restoring percolation, including necessary cleaning, repairs, replacement, electric current, supervision, debris removal, engineering and supervision and any and all other items of work necessary and incidental for the proper maintenance and operation thereof. The Report describes all new improvements or substantial changes in existing improvements.
Section 5 The County Auditor of the County of Monterey shall enter on the County Assessment Roll opposite each eligible parcel of land the amount of levy so apportioned by the formula and method outlined in the Report, and such levies shall be collected at the same time and in the same manner as the County taxes are collected. After collection by the County, the net amount of the levy shall be paid to the City Treasurer.
Section 6 The City Finance Director shall deposit all money representing assessments collected by the County for the District to the credit of a fund known as the "Improvement Fund, City of Soledad, Diamond Ridge Benefit Assessment District No. 1” and such monies shall be expended only for the maintenance, operation, and servicing improvements and facilities as described in Section 4.
Section 7 The adoption of this Resolution constitutes the District levy for the fiscal year commencing July 1, 2024 and ending June 30, 2025.
Section 8 The City Clerk or their designate is hereby authorized and directed to file the levy with the County Auditor upon adoption of this Resolution pursuant to Chapter 4, Article 1, Section 22641 of the Act.
51 DRAFT – FOR REVIEW
PASSED, APPROVED and ADOPTED this 19th day of June 2024 by the following vote:
AYES, and in favor thereof, Councilmembers:
NOES, Councilmembers:
ABSENT, Councilmembers:
ABSTAIN, Councilmembers:
______________________________
ANNA M. VELAZQUEZ, Mayor
ATTEST:
___________________________________
MEGAN HUNTER, City Manager
52 Irvine | San Jose | San Francisco | Riverside
Dallas | Houston | Raleigh | Tampa
www.FinanceDTA.com
Public Finance
Public-Private Partnerships
Development Economics
Clean Energy Bonds
FINAL ENGINEER’S REPORT
DIAMOND RIDGE
BENEFIT ASSESSMENT DISTRICT NO. 1
FUND #649
CITY OF SOLEDAD | COUNTY OF MONTEREY
Beginning Fiscal Year: 2024-2025
Intent Meeting: May 15, 2024
Public Hearing: June 19, 2024
Reso. 6105
53 www.FinanceDTA.com
99 Almaden Blvd, Suite 875
San Jose, CA 95113
CITY COUNCIL AND STAFF
MAYOR
Anna M. Velazquez
MAYOR PRO TEMPORE
Maria Corralejo
COUNCIL MEMBERS
Fernando Cabrera
Fernando Ansaldo-Sanchez
PUBLIC WORKS DIRECTOR
Donald Wilcox, P.E.
PROFESSIONAL SERVICES
ASSESSMENT ENGINEERING
Stephen A. Runk, P.E.
DTA
54 TABLE
OF CONTENTS
SECTION PAGE
I AFFIDAVIT AND CERTIFICATES............................1 II ENGINEER’S REPORT.............................................. 3 III PLANS AND SPECIFICATIONS.............................. 5 A Description of the District ............................................5 B District Improvements, Facilities, And
Services .............................................................................5 IV COST ESTIMATE...................................................... 7 A Costs of Improvements ................................................. 7 B Annual Cost Indexing ....................................................8 C Contributions from Other Sources.............................9 D Annual Installments .....................................................10 E Net Assessment.............................................................10 V ASSESSMENT ROLL................................................11 VI METHOD OF ASSESSMENT ................................. 12 A Background....................................................................12 B Benefits of Improvements ..........................................13 C Categories of Benefit ...................................................14 D Allocation of Special Benefit to Parcels...................14 E Amount of Assessment................................................15
VII ASSESSMENT DIAGRAM AND
BOUNDARY MAP ................................................... 17
VIII TERMINATION OF
DISTRICT/LIMITATIONS OF REPORT ............... 18
A Termination of District................................................18 B Limitations of Report...................................................18
APPENDICES
APPENDIX A ASSESSMENT ROLL
55 1
SECTION I
AFFIDAVIT AND CERTIFICATES
City of Soledad June 19, 2024
FINAL Engineer’s Report for Diamond Ridge BAD No. 1
www.FinanceDTA.com
I AFFIDAVIT AND CERTIFICATES
CITY OF SOLEDAD
DIAMOND RIDGE
BENEFIT ASSESSMENT DISTRICT NO. 1
This Engineer’s Report (“Report”) and the enclosed descriptions, budget, and assessment diagram outlines the District and includes the proposed assessments for each lot, parcel, and subdivision of land within said District to be levied for Fiscal Year 2024-2025 as they existed at the time of the passage of the Resolution of Intention.
Reference is hereby made to the Monterey County Assessor’s Maps for a detailed description of the lines and dimensions of parcels within the District. The undersigned respectfully submits the enclosed report as directed by the City Council.
Dated this ______ day of ______________, 2024.
DTA
Assessment Engineer
On Behalf of the City of Soledad
By: __________________________________________
Kuda Wekwete
Project Manager
By: __________________________________________
Stephen A. Runk, P.E.
License Number: C23473
56 2
SECTION I
AFFIDAVIT AND CERTIFICATES
City of Soledad June 19, 2024
FINAL Engineer’s Report for Diamond Ridge BAD No. 1
www.FinanceDTA.com
I HEREBY CERTIFY that the enclosed Engineer’s Report, together with the Assessment Diagram thereto attached, was filed with me on the ________ day of ____________, 2024. By: _____________________________ Megan Hunter, City Manager
City of Soledad, Monterey County
I HEREBY CERTIFY that the enclosed Engineer’s Report, together with the Assessment Diagram thereto attached, was approved and confirmed by the City Council of the City of Soledad, California, on the ______ day of _____________, 2024. By: _____________________________ Megan Hunter, City Manager
City of Soledad, Monterey County
57 3
SECTION II
ENGINEER’S REPORT
City of Soledad June 19, 2024
FINAL Engineer’s Report for Diamond Ridge BAD No. 1
www.FinanceDTA.com
II ENGINEER’S REPORT
WHEREAS, the City Council of the City of Soledad (“City”), pursuant to the provisions of the Benefit Assessment Act of 1982, Chapter 64 of Division 2 of the California Government Code (“1982 Act”), adopted its resolution (“Resolution”) initiating proceedings for the levy of Fiscal Year 2024-2025 assessments against properties in the Diamond Ridge Benefit Assessment District No. 1 (the “District”) to fund maintenance and operation of street and storm water improvements that have been determined to specially benefit properties in the District (“Improvements”).
WHEREAS, the Resolution designates DTA as Assessment Engineer and directed the Assessment Engineer to prepare and file a report (“Engineer’s Report” or “Report”) pursuant to the 1982 Act and Article XIIID of the California Constitution (“Proposition 218”).
This Report includes the following sections:
Plans and Specifications – Plans and specifications for services to be provided.
Plans and specifications are a part of this Report whether or not separately bound.
Cost Estimate – An estimate of the annual cost of services to be provided. Also included, are administrative and incidental costs that include maintenance, reserve, repairs, and rehabilitation expenses.
Assessment Roll – An assessment roll, showing the amount to be assessed against each parcel of real property within this District and the names and addresses of the property owners. An Assessor’s Parcel number or other designation describes each parcel. Each parcel is also assigned an “assessment number” that links the Assessment Roll to the Assessment Diagram.
Method of Assessment – A statement of the method by which the Assessment Engineer determined the amount to be assessed against each parcel, based on special benefits to be derived by each parcel from the services.
Assessment Diagram – A diagram showing all of the parcels of real property to be assessed within this District. The diagram corresponds with the Assessment Roll by assessment number.
Termination of District/Limitations of Report – A statement as to the duration of the District and the accuracy of the data and information necessary for the development of this annual Report.
NOW THEREFORE, the undersigned, acting as an agent for DTA, Assessment Engineer for the District, by virtue of the power vested under the 1982 Act and the order of the City, hereby submits this Engineer’s Report and makes the following assessment to cover the portion of the estimated costs of the Improvements, including the incidental costs and expenses, to be paid by the District.
The net assessment in Fiscal Year 2024-2025 is summarized in Table 1. 58 4
SECTION II
ENGINEER’S REPORT
City of Soledad June 19, 2024
FINAL Engineer’s Report for Diamond Ridge BAD No. 1
www.FinanceDTA.com
Table 1: Net Assessment for Fiscal Year 2024-2025
Item Amount
Maintenance Costs $25,702
Capital Improvement Costs $289,001
Administration Costs $40,928
Levy Adjustments (Reserve Fund Credit) ($266,910)
Net Assessment* $88,721
*Note: Figures may not sum due to rounding. DTA does hereby assess the net amount to be assessed upon all assessable lots or parcels of land within the District by apportioning the amount allocable among the several lots or parcels of each in proportion to the estimated special benefits to be received by each such lot or parcel from the Improvements, as more particularly set forth in the list attached as Appendix A (“Assessment Roll”) and by this reference made as part of this Engineer’s Report.
The District diagram appearing herein is a representation of the assessment diagram that was approved by resolution of the City Council. Reference is hereby made to the Assessor’s Maps of the County of Monterey for Fiscal Year 2024-2025 for a more particular description of the properties within the District. Each parcel of land assessed is described on the Assessment Roll by reference to its parcel number as shown on the County of Monterey Assessment Roll.
DTA
Kuda Wekwete Date
Managing Director
Stephen A. Runk, P.E. Date
License Number: C23473
59 5
SECTION III
PLANS AND SPECIFICATIONS
City of Soledad June 19, 2024
FINAL Engineer’s Report for Diamond Ridge BAD No. 1
www.FinanceDTA.com
III PLANS AND SPECIFICATIONS
The plans, specifications, and studies of the Improvements for this District are voluminous and will not be bound in this Report, but by this reference are incorporated as if attached to this Report. The plans and specifications are on file with the City of Soledad and/or the County of Monterey, California.
A Description of the District
The District is generally bounded by the northerly boundary of Miravale, Phase I Tract Map to the north, Gabilan Drive to the south, Orchard Lane to the east, and Toledo Street to the west. A District diagram incorporated herein under Section VII of this Report outlines the boundaries of the District. This diagram incorporates all lots, parcels, and subdivisions of land within the District as the same existed at the time this Report was prepared, a complete listing of which is provided in Appendix A of this Report.
B District Improvements, Facilities, and Services
The following descriptions, provided in the formation documents of the District, identify the types of improvements that will be maintained by the District. Detailed maps and descriptions of these improvements are on file with the City and are available for inspection in the office of the City Engineer and have been incorporated into this Report by reference.
B.1 Street Improvements
The maintenance and operation of the improvements located on the streets within the District includes street sweeping, storm drain lines, including necessary cleaning, repairs, replacement, electric current, supervision, debris removal, engineering and inspection, and any and all other items of work necessary and incidental for the proper maintenance and operation thereof. Additionally, maintenance and operation includes all additions, improvements, and enlargements which may be made on the previously described work within the following streets and on appurtenant improvement plans.
Improvements that are covered under the maintenance and operations of the District are located on the following streets: Toledo Street (East Half), Orchard Lane, Gabilan Drive, San Antonio, Santa Ynez, San Miguel, Los Flores Street, La Colina Street, Estrella Street, San Gabriel, Vista Avenue, Santa Barbara, San Jose, Solano, San Luis Rey, San Juan Bautista, Portola Street, Entrada Drive, San Fernando, Vida Street, Carmelo Street, Santa Cruz, Terraza Street, Dolores, Santa Clara, La Purisima, and San Rafael.
60 6
SECTION III
PLANS AND SPECIFICATIONS
City of Soledad June 19, 2024
FINAL Engineer’s Report for Diamond Ridge BAD No. 1
www.FinanceDTA.com
B.2 Storm Water Improvements
Maintenance and operation includes storm retention pond silt removal, bank stabilization and restoring percolation, including necessary cleaning, repairs, replacement, electric current, supervision, debris removal, pest abatement, engineering and inspection, and any and all other items of work necessary and incidental for the proper maintenance and operation thereof. Additionally, maintenance and operation includes all additions, improvements, and enlargements which may be made on the previously described work within the following area and on appurtenant improvement plans.
B.3 Incidental and Other Expenses
Incidental costs include contingencies and assessment district incidentals such as engineering, printing, notices to property owners, collection costs, legal fees, administration, and supervision.
61 7
SECTION IV
COST ESTIMATE
City of Soledad June 19, 2024
FINAL Engineer’s Report for Diamond Ridge BAD No. 1
www.FinanceDTA.com
IV COST ESTIMATE
Applicable law requires the Engineer’s Report to contain an estimate of the costs of the Improvements for Fiscal Year 2024-2025, including estimates of (i) the total costs for Improvements for Fiscal Year 2024-2025, including incidental expenses, (ii) the amount of any surplus in the improvement fund to be carried over from a previous Fiscal Year, (iii) the amount of any contributions to be made from sources other than assessments levied pursuant to this part, (iv) the amount, if any, of the annual installment for the Fiscal Year where the legislative body has ordered an assessment for the estimated cost of any improvements to be levied and collected in annual installments, and (v) the net amount to be assessed upon assessable lands within the District. Estimates of these amounts are provided below.
The following describes the costs that are funded through the District.
A Costs of Improvements
A.1 Projected Annual Maintenance Costs & Capital Improvement Costs Included in the City’s Public Works Department Budget Request are estimated costs for the annual maintenance, servicing and funding of all improvements within the District. District direct maintenance expenses are estimated at $25,702 for Fiscal Year 2024-2025 as shown in Table 2a below. District’s direct capital improvement costs are estimated at $289,001 for Fiscal Year 2024-2025 as shown in Table 2b below.
Table 2a: Projected Annual Direct Maintenance Costs
Item Description Cost Estimate
Percolation Pond $6,781
Street Sweeping $14,206
Storm Drain Repair/Maintenance $3,358
Engineering $1,357
City Inspection and Overhead $0
Reserve Collection/(Transfer) $0
Total* $25,702
*Note: Figures may not sum due to rounding.
Table 2b: Projected Capital Improvement Costs
Item Description Cost Estimate
Crack Seal / Slurry Seal Project* $289,001
Total $289,001
*Funded by the available funds in the capital reserve account. 62 8
SECTION IV
COST ESTIMATE
City of Soledad June 19, 2024
FINAL Engineer’s Report for Diamond Ridge BAD No. 1
www.FinanceDTA.com
A.2 Projected Annual Administration Costs
In addition to the costs listed above, there will be costs attributed to the administration of the District. As shown in Table 3, the District administration costs are estimated to be $40,928 for Fiscal Year 2024-2025. These costs are summarized below.
Table 4: Projected Annual Administration Costs
Item Description Cost Estimate
City Administration $26,816
Contingency $2,583
District Administration $5,000
Printing and Advertising $1,323
County Collection $5,205
Total* $40,928
*Note: Figures may not sum due to rounding.
A.3 Projected Annual Levy Adjustment
Finally, in addition to the costs listed above, certain levy adjustments will be made to account for any operating or capital reserve credits or required capital collections to the District’s reserve fund. As shown in Table 4, an Operating Reserve Credit of $53,050 and Capital Reserve Credit of $289,001 have been applied to offset the required Capital Reserve Collection of $75,141. Therefore, a net total of $266,910 Reserve Fund Credit has been applied to the Fiscal Year 2024-2025 assessment. Table 5: Projected Annual Levy Adjustment Item Description Cost Estimate
Capital Reserve Collection $75,141
Operating Reserve Credit ($53,050)
Capital Reserve Credit ($289,001)
Total ($266,910)
B Annual Cost Indexing
B.1 City/District Administration, Printing, and Advertising With the passage of Proposition 218, any proposed increase in assessments must be approved by impacted property owners via a mail ballot and public hearing process, similar to these proceedings. A weighted simple majority of ballots received (weighted according to each parcel’s proportionate assessment obligation) must be affirmative for the City Council to confirm and levy the increased assessments. For small assessment districts or districts with relatively low dollar assessments, the cost of an Engineer’s Report, balloting, and the public hearing process can potentially 63 9
SECTION IV
COST ESTIMATE
City of Soledad June 19, 2024
FINAL Engineer’s Report for Diamond Ridge BAD No. 1
www.FinanceDTA.com
exceed the total amount of the increase. The incidental costs of these proceedings may be added to the assessments, resulting in even higher assessments.
Therefore, indexing assessments annually to the published “San Francisco Consumer Price Index for Urban Consumers” (“SF CPI”) allows for minor increases in normal maintenance and operating costs, without incurring the costs of ballot proceedings required by Proposition 218. Any other significant changes to the District (e.g., increases in service, modification of the boundary, etc.) would still require Proposition 218 proceedings and, ultimately, property owner approval.
Thus, on each July 1, commencing on July 1, 2003, the maximum authorized unit assessment rates established in these proceedings will be indexed (increased) annually by a factor equal to the published April SF CPI from the preceding Fiscal Year. The most recent data for the increase in the SF CPI is the increase between April 2023 and April 2024 and shows an increase equal to 3.77%. Therefore, on July 1, 2024, the maximum assessment will thus be increased by 3.77%.
Since the maximum assessment is likely sufficient to cover the cost estimates for improvements and other expenses for Fiscal Year 2024-2025, an amount equal to only the total projected costs will be assessed on the property within the District.
The assessment levy in future years may be any amount less than or equal to the maximum assessment in that year.
B.2 Collection Fees
The County Auditor/Controller also charges an additional 0.25% of the total amount assessed.
B.3 Reserve Collection/Transfer
The applicable law provides for a District Reserve Fund that provides for the collection of funds to cover District operations between July 1 (beginning of the Fiscal Year) and the date on which the County remits first installment of assessments collected from the property tax bills (typically January or February). Any negative amounts entries for this budget item represent transfers from the Reserve Fund to reduce the assessment in a given fiscal year. A fully funded Reserve enables the District to (i) cover operational expenses incurred in the six (6) months of the fiscal year, without any City funds from non-District accounts; and (ii) address any unforeseen or unusual expenditures that may occur during the year.
C Contributions from Other Sources
Proposition 218 provides that “an agency shall separate the general benefits from the special benefits conferred…” In accordance with that provision, it is determined that there will be no general benefit from the Improvements in Fiscal Year 2024-2025, as explained in Section VI of this Report.
64 10
SECTION IV
COST ESTIMATE
City of Soledad June 19, 2024
FINAL Engineer’s Report for Diamond Ridge BAD No. 1
www.FinanceDTA.com
D Annual Installments
The entire amount of the net assessment, as shown in Table 5 below, will be assessed in Fiscal Year 2024-2025. E Net Assessment
Pursuant to the foregoing, Table 5 shows the net amount to be assessed upon assessable lands within the District in Fiscal Year 2024-2025. Table 6: Net Assessment for Fiscal Year 2024-2025 Item Total Costs Special Benefit
Allocated
Net
Assessment
Maintenance Costs (Direct)
Percolation Pond $6,781 100% $6,781
Street Sweeping $14,206 100% $14,206
Storm Drain Repair/Maintenance $3,358 100% $3,358
Engineering $1,357 100% $1,357
City Inspection and Overhead $0 100% $0
Reserve Collection/Transfer $0 100% $0
Capital Improvement Costs (Direct)
Crack Seal / Slurry Seal Project** $289,001 100% $289,001 Administration Costs
City Administration $26,816 100% $26,816
Contingency $2,583 100% $2,583
District Administration $5,000 100% $5,000
Printing and Advertising $1,323 100% $1,323
County Collection $5,205 100% $5,205
Levy Adjustments
Capital Reserve Collection $75,141 100% $75,141
Operating Reserve Credit ($53,050) 100% ($53,050)
Capital Reserve Credit ($289,001) 100% ($289,001)
Net Assessment* $88,721 N/A $88,721
*Note: Figures may not sum due to rounding. **Funded by the available funds in the capital reserve account. 65 11
SECTION V
ASSESSMENT ROLL
City of Soledad June 19, 2024
FINAL Engineer’s Report for Diamond Ridge BAD No. 1
www.FinanceDTA.com
V ASSESSMENT ROLL
The Assessment Engineer has prepared an Assessment Roll for the District as required by applicable law, based upon the assessment methodology described in this Engineer’s Report. The Assessment Roll includes the net total assessment for Fiscal Year 2024-2025 and shows the Fiscal Year 2024-2025 assessment, assessment number, Assessor’s Parcel Number, and land use designation for each parcel.
The Assessment Roll, as provided in Appendix A, lists the Assessor’s Parcel Numbers within this Assessment District by assessment number. The assessment numbers appearing on the Assessment and the names and addresses of the property owners are as shown on the last equalized assessment roll for taxes or as known to the Assessor of Monterey County.
All parcel information has been provided to DTA by the City Public Works Department, the previous Assessment Engineer, and the County of Monterey. 66 12
SECTION VI
METHOD OF ASSESSMENT
City of Soledad June 19, 2024
FINAL Engineer’s Report for Diamond Ridge BAD No. 1
www.FinanceDTA.com
VI METHOD OF ASSESSMENT
A Background
Pursuant to the 1982 Act, the legislative body establishes and determines the “estimated benefit received” by each parcel from the Improvements.
In addition, Article XIIID of the California Constitution, added in November 1996 through the passage of Proposition 218 by voters of the State of California, requires, inter alia, that (i) only special benefits be assessable, (ii) no assessment may exceed the proportional special benefit conferred on the parcel assessed, and (iii) publicly owned parcels shall not be exempt from assessment unless clear and convincing evidence demonstrates that such publicly owned parcels receive no special benefits from the improvements for which the assessment is levied.
“Special benefit” is a particular and distinct benefit over and above general benefits conferred on real property located in the District or to the public at large. Importantly, the general enhancement of property value does not constitute special benefit. As such, this Engineer’s Report has been designed to comply with these requirements, as well as to incorporate recent California court decisions such as: Silicon Valley Taxpayers Association, Inc. v. Santa Clara County Open Space Authority (2008), Beutz v. County of Riverside (2010), Golden Hills Neighborhood Association v. City of San Diego (2011), and Concerned Citizens v. West Point Fire Protection District (2011). Methodologically, it is necessary and essential to identify the special benefit that the improvements, facilities, and services will render to the properties within the District. It is also necessary that the properties receive a special and direct benefit as distinguished from benefit to the general public.
The Assessment Engineer is appointed for the purpose of analyzing the facts and determining the method and formula for apportionment of the assessment obligation to the benefited properties. For these proceedings, the City has retained the firm of DTA as the Assessment Engineer.
The Assessment Engineer makes his or her recommendation for the method of apportionment in this Engineer’s Report for consideration at the public hearing. However, the final authority and action rests with the City Council after hearing all testimony and evidence presented at the public hearing. Upon conclusion of the public hearing, the City Council must make the final action in determining that the assessment has been made in direct proportion to the special benefit received.
In determining the net amount to be assessed upon parcels within the District, Section 22573 of the California Streets and Highways Code states that such amount “may be apportioned by any formula or method which fairly distributes the net amount among all assessable lots or parcels in proportion to the estimated benefits to be received by each such lot or parcel from the improvements.”
67 13
SECTION VI
METHOD OF ASSESSMENT
City of Soledad June 19, 2024
FINAL Engineer’s Report for Diamond Ridge BAD No. 1
www.FinanceDTA.com
Proposition 218 further states that “no assessment shall be imposed on any parcel which exceeds the reasonable cost of the proportional special benefit conferred on that parcel,” where “special benefit” means “a particular and distinct benefit over and above general benefits conferred on real property located in the District or to the public at large.” This Section VI describes the methodology used to calculate the net amount to be assessed on each parcel within the District in proportion to the special benefit conferred on each such parcel.
B Benefits of Improvements
The benefits associated with the local landscaping improvements are shown in Table 6 below.
Table 7: Benefits from Landscaping Improvements
Landscaping Improvements
Enhanced desirability of properties through association with the improvements. Improved aesthetic appeal of properties within the District providing a positive representation of the area. Enhanced adaptation of the urban environment within the natural environment from adequate green space and landscaping. Environmental enhancement through improved erosion resistance, and dust and debris control. Increased sense of pride in ownership of property within the District resulting from well-maintained improvements associated with the properties. Reduced criminal activity and property-related crimes (especially vandalism) against properties in the District through well-maintained surroundings and amenities including abatement of graffiti. Enhanced environmental quality of the parcels within the District by moderating temperatures, providing oxygenation, and attenuating noise. The special benefits of street lighting are the convenience, safety, and security of property, improvements, and goods as identified in Table 7 below.
Table 8: Benefits from Street Lighting Improvements
Street Lighting Improvements
Enhanced deterrence of crime and the aid to police protection. Increased nighttime safety on roads and highways. Improved ability of pedestrians and motorists to see. Improved ingress and egress to property. Reduced vandalism and other criminal acts and damage to improvements or property. Improved traffic circulation and reduced nighttime accidents and personal property loss. Increased promotion of business during nighttime hours in the case of commercial properties. 68 14
SECTION VI
METHOD OF ASSESSMENT
City of Soledad June 19, 2024
FINAL Engineer’s Report for Diamond Ridge BAD No. 1
www.FinanceDTA.com
C Categories of Benefit
Proposition 218 provides that “an agency shall separate the general benefits from the special benefits conferred on a parcel,” where “Special Benefit means a particular and distinct benefit over and above general benefits conferred on real property located in the district or to the public at large.” It is therefore necessary to establish definitions of General Benefit and Special Benefit as such terms relate to the benefit to be derived from the Improvements.
The Improvements to be maintained and operated in the District were within or in areas in close proximity to the proposed developed residential lots. As a result, the developed residential lots in the District will receive 100% of the special benefits of the operation and maintenance of the Improvements. These benefits include enhanced neighborhood health and safety, improved quality of life from drainage, flood control and street improvements, protection of improved property, enhanced comfort, and increased desirability of the immediate surroundings of the residential units within the District. Importantly, because of the location of the improvements within or close to the District itself, there is no general benefit to properties outside the District or the community as a whole. Any such general benefit is so incidental and negligible that it cannot be calculated for purposes of assessment.
D Allocation of Special Benefit to Parcels
In accordance with the provisions in the formation documents, the annual maintenance and operation budget is developed for improvements located in the entire Diamond Ridge Subdivision Project. As discussed previously, developed parcels in the District are the only parcels that derive special benefit from maintenance and operations and as such, must bear the cost of these activities. However, it is anticipated that as future subdivisions develop the assessments will be prorated to reflect the District’s proportionate share of the costs of a given operation and maintenance activity.
Importantly, Article XlllD provides that publicly owned properties must be assessed unless there is clear and convincing evidence that those properties receive no special benefit from the assessment. As a result, the following property will be considered exempt from the assessment: areas of public streets, public avenues, public lanes, public roads, public drives, public courts, public alleys, public easements and right-of-way, public greenbelts and public parkways, and that portion of public property that is not developed and used for business purposes similar to private commercial, industrial, and institutional activities.
Factored development unit calculations for residential areas are as follows:
Low Density Single-Family Residential = 1.0 Unit
Future Medium Density Residential = 0.8 Unit
69 15
SECTION VI
METHOD OF ASSESSMENT
City of Soledad June 19, 2024
FINAL Engineer’s Report for Diamond Ridge BAD No. 1
www.FinanceDTA.com
E Amount of Assessment
Pursuant to the foregoing, Table 8 below shows the net amount to be assessed upon assessable lands within the District in Fiscal Year 2024-2025. Table 9: Fiscal Year 2024-2025 Assessment Rates in the District Assessment Per EDU
Fiscal Year 2023-2024
Assessment Per EDU
Fiscal Year 2024-2025
Max Assessment Per EDU
Fiscal Year 2024-2025
$243.08 $255.68 $490.68
70 16
SECTION VI
METHOD OF ASSESSMENT
City of Soledad June 19, 2024
FINAL Engineer’s Report for Diamond Ridge BAD No. 1
www.FinanceDTA.com
Table 10: Fiscal Year 2024-2025 Cost Estimate
Description Total Amount ($)
Special Benefit
Apportioned to
District
Fiscal Year 2024-2025
Total Budget
(Amount Funded to District)
(A) Annual Maintenance (Direct Costs)
Operating Expenses
Percolation Pond $6,780.93 100% $6,780.93
Street Sweeping $14,206.36 100% $14,206.36
Storm Drain Repair/Maintenance $3,357.86 100% $3,357.86 Engineering $1,356.69 100% $1,356.69
City Inspection & Overhead $0.00 100% $0.00
Reserve Collection/ (Transfer) $0.00 100% $0.00
(B) Capital Improvements
Crack Seal / Slurry Seal Project* $289,001.00 100% $289,001.00 (C) Administration
City Administration $26,816.17 100% $26,816.17
Contingency $2,583.22 100% $2,583.22
District Administration $5,000.00 100% $5,000.00
Printing & Advertising $1,323.26 100% $1,323.26
County Collection $5,205.00 100% $5,205.00
Subtotal (A+B) $355,630.49 NA $355,630.49
(D) Levy Adjustments
Capital Reserve Collection $75,141.43
Operating Reserve Transfer In/(Out) -$53,050.00
Capital Reserve Transfer Out -$289,001.00
Balance to Levy (A+B+C) NA NA $88,720.91
(E) District Assessment
Total EDUs Count 347
Total Parcels Count 347
Total Parcels Levied 347
FY 2024-2025 Calculated Assessment per EBU $255.68
FY 2024-2025 Maximum Assessment per EBU $490.68
FY 2024-2025 Maximum Levy $170,265.96
(F) Fund Balance Information
Beginning Fund Balance FY 2024-2025 $594,434.58
Reserve Fund Adjustments ($266,909.57)
Anticipated Ending Balance FY 2024-2025 $327,525.01
*Funded by the available funds in the capital reserve account.
City of Soledad
Engineer's Report
Diamond Ridge Benefit Assessment District No.1 - FUND #649 Fiscal Year 2024-2025 Cost Estimate
71 17
SECTION VII
ASSESSMENT DIAGRAM AND
BOUNDARY MAP
City of Soledad June 19, 2024
FINAL Engineer’s Report for Diamond Ridge BAD No. 1
www.FinanceDTA.com
VII ASSESSMENT DIAGRAM AND BOUNDARY MAP
The boundary map for the District has been previously approved and submitted to the City in the format required by the 1972 Act, and is on file in the Office of the City Clerk.
The parcels within the District generally consist of the lots, parcels, and subdivisions of land found within the following District Diagram and are based on the Monterey County Assessor’s Maps and the Monterey County Assessor’s information that existed at the time this Report was prepared.
Figure 1: Assessment Diagram
72 18
SECTION VIII
TERMINATION OF
DISTRICT/LIMITATIONS OF
REPORT
City of Soledad June 19, 2024
FINAL Engineer’s Report for Diamond Ridge BAD No. 1
www.FinanceDTA.com
VIII TERMINATION OF DISTRICT/LIMITATIONS OF REPORT
A Termination of District
Assessments associated with the District will be levied each Fiscal Year until the District is dissolved by the City Council.
B Limitations of Report
The conclusions, calculations, and recommendations in this Report rely on the substantial data and information provided to DTA at the time of the writing of the Report by the following parties:
1. City of Soledad, specifically the Public Works Department;
2. The previous Assessment Engineer; and
3. The County of Monterey.
73 APPENDIX A
City of Soledad
Diamond Ridge Benefit Assessment District No. 1
Fiscal Year 2024-2025
ASSESSMENT ROLL
74 99 ALMADEN BLVD., SUITE 875
SAN JOSE, CA 95113
PHONE: (800) 969-4DTA
Public Finance
Public-Private Partnerships
Development Economics
Clean Energy Bonds
www.FinanceDTA.com
75 RESOLUTION NO. 6106
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SOLEDAD ORDERING
THE LEVY AND COLLECTION OF ASSESSMENTS WITHIN THE DIAMOND RIDGE PARKS AND OPEN SPACE MAINTENANCE ASSESSMENT DISTRICT NO. 1 (MIRAVALE I, PHASE I) FOR FISCAL YEAR 2024/2025
The City Council of the City of Soledad, California (hereinafter referred to as the “City”) does resolve as follows:
WHEREAS, the City Council has by previous Resolutions initiated proceedings and declared its intention to levy assessments for the Diamond Ridge Parks and Open Space Maintenance Assessment District No. 1 (Miravale I, Phase I) (hereafter referred to as the “District”) for the fiscal year commencing July 1, 2024 and ending June 30, 2025 pursuant to the provisions of the Landscaping and Lighting Act of 1972, Part 2 of Division 15 of the California Streets and Highways Code, commencing with Section 22500 (hereafter referred to as the "Act") to pay the costs and expenses of operating, maintaining, and servicing improvements and facilities located within the boundaries of the District; and,
WHEREAS, DTA has prepared and filed with the City Clerk, and the City Clerk has presented to the Council, the Engineer’s Annual Levy Report (hereafter referred to as the “Report”) for the District that describes the District and the proposed levy and collection of assessments upon eligible parcels of land within the District, and the Council did by previous Resolution give preliminary approval of said Report; and,
WHEREAS, the City Council desires to levy and collect assessments against parcels of land within the District for the fiscal year commencing July 1, 2024 and ending June 30, 2025 to pay the costs and expenses of operating, maintaining, and servicing improvements and facilities located within the boundaries of the District; and,
WHEREAS, this City and DTA have reviewed the provisions of Section XIIID of the California State Constitution and found that the proposed assessments comply with these provisions.
NOW, THEREFORE, BE IT RESOLVED, DETERMINED, AND ORDERED BY
THE CITY COUNCIL OF THE CITY OF SOLEDAD FOR THE DIAMOND RIDGE PARKS AND OPEN SPACES MAINTENANCE ASSESSMENT DISTRICT NO. 1 (MIRAVALE I, PHASE I) AS FOLLOWS:
Section 1 Following notice duly given, the City Council has held a full and fair Public Hearing regarding the District, the levy and collection of assessments, the Report prepared in connection therewith, and considered all oral and written statements, protests, and communications made or filed by interested persons regarding these matters.
Section 2 Based upon its review (and amendments, as applicable) of the Report, the City Council hereby finds and determines that:
i) the land within the District will receive special benefit by the operation, maintenance, and servicing of improvements and facilities located within the boundaries of the District; and,
76 ii) the District includes all of the lands so benefited; and, iii) the net amount to be assessed upon the lands within the District in accordance with the fee for the fiscal year commencing July 1, 2024 and ending June 30, 2025 is apportioned by a formula and method which fairly distributes the net amount among all eligible parcels in proportion to the estimated benefits to be received by each parcel from the improvements and services. This Fiscal Year assessment for the Diamond Ridge Parks and Open Spaces Maintenance Assessment District No. 1 (Miravale I, Phase I) is $475.14 per parcel.
Section 3 The Report and assessments as presented to the City Council and on file in the Office of the City Clerk are hereby confirmed as filed and approved by the City Council.
Section 4 The maintenance, operation, and servicing of the improvements and appurtenant facilities shall be performed pursuant to the Act. The City Council hereby orders the proposed improvements to be made, which improvements are briefly described as follows: the maintenance and operation of street lights and any or all public landscaping and irrigation improvements of a local nature on landscaped strips of land adjacent to curbs of the following described streets, including jogging paths, planter walls, grass berms, appurtenant irrigation systems; ornamental plantings including lawns, shrubs, and trees; including necessary repairs, replacements, water, electric current, spraying, care, supervision, debris removal, and any and all other items of work necessary and incidental for the proper maintenance and operation thereof. The Report describes all new improvements or substantial changes in existing improvements.
Section 5 The County Auditor of the County of Monterey shall enter on the County Assessment Roll opposite each eligible parcel of land the amount of levy so apportioned by the formula and method outlined in the Report, and such levies shall be collected at the same time and in the same manner as the County taxes are collected pursuant to Chapter 4, Article 2, Section 22646 of the Act. After collection by the County, the net amount of the levy shall be paid to the City Treasurer.
Section 6 The City Finance Director shall deposit all money representing assessments collected by the County for the District to the credit of a fund known as the "Improvement Fund, City of Soledad, Diamond Ridge Parks and Open Space Maintenance Assessment District No. 1 (Miravale I, Phase I) and such monies shall be expended only for the maintenance, operation, and servicing improvements and facilities as described in Section 4.
Section 7 The adoption of this Resolution constitutes the District levy for the fiscal year commencing July 1, 2024 and ending June 30, 2025.
Section 8 The City Clerk or their designate is hereby authorized and directed to file the levy with the County Auditor upon adoption of this Resolution pursuant to Chapter 4, Article 1, Section 22641 of the Act.
77 PASSED, APPROVED and ADOPTED this 19th day of June 2024 by the following vote:
AYES, and in favor thereof, Councilmembers:
NOES, Councilmembers:
ABSENT, Councilmembers:
ABSTAIN, Councilmembers:
______________________________
ANNA M. VELAZQUEZ, Mayor
ATTEST:
____________________________________
MEGAN HUNTER, City Manager
78 Irvine | San Jose | San Francisco | Riverside
Dallas | Houston | Raleigh | Tampa
www.FinanceDTA.com
Public Finance
Public-Private Partnerships
Development Economics
Clean Energy Bonds
FINAL ENGINEER’S REPORT
DIAMOND RIDGE
PARKS AND OPEN SPACE MAINTENANCE
ASSESSMENT DISTRICT NO. 1
FUND #650
CITY OF SOLEDAD | COUNTY OF MONTEREY
Beginning Fiscal Year: 2024-2025
Intent Meeting: May 15, 2024
Public Hearing: June 19, 2024
Reso. 6106
79 www.FinanceDTA.com
99 Almaden Blvd., Suite 875
San Jose, CA 95113
CITY COUNCIL AND STAFF
MAYOR
Anna M. Velazquez
MAYOR PRO TEMPORE
Maria Corralejo
COUNCIL MEMBERS
Fernando Cabrera
Fernando Ansaldo-Sanchez
PUBLIC WORKS DIRECTOR
Donald Wilcox, P.E.
PROFESSIONAL SERVICES
ASSESSMENT ENGINEERING
Stephen A. Runk, P.E.
DTA
80 TABLE
OF CONTENTS
SECTION PAGE
I AFFIDAVIT AND CERTIFICATES ...........................1 II ENGINEER’S REPORT ............................................. 3 III PLANS AND SPECIFICATIONS ............................. 5 A Description of the District ............................................5 B District Improvements, Facilities, and
Services .............................................................................5 IV COST ESTIMATE ..................................................... 7 A Costs of Improvements ................................................. 7 B Annual Cost Indexing ....................................................8 C Contributions from Other Sources.............................9 D Annual Installments .....................................................10 E Net Assessment.............................................................10 V ASSESSMENT ROLL................................................11 VI METHOD OF ASSESSMENT................................. 12 A Background....................................................................12 B Benefits of Improvements ..........................................13 C Categories of Benefit ...................................................14 D Allocation of Special Benefit to Parcels...................14 E Amount of Assessment................................................15
VII ASSESSMENT DIAGRAM AND
BOUNDARY MAP.................................................. 17
VIII TERMINATION OF
DISTRICT/LIMITATIONS OF REPORT.............. 18
A Termination of District................................................18 B Limitations of Report...................................................18
APPENDICES
APPENDIX A ASSESSMENT ROLL
81 1
SECTION I
AFFIDAVIT AND CERTIFICATES
City of Soledad
FINAL Engineer’s Report for Diamond Ridge Parks and Open Space MAD No. 1 June 19, 2024 www.FinanceDTA.com
I AFFIDAVIT AND CERTIFICATES
CITY OF SOLEDAD DIAMOND RIDGE PARKS AND OPEN SPACES
MAINTENANCE ASSESSMENT DISTRICT NO. 1
This Engineer’s Report (“Report”) and the enclosed descriptions, budget, and assessment diagram outlines the District and includes the proposed assessments for each lot, parcel, and subdivision of land within said District to be levied for Fiscal Year 2024-2025 as they existed at the time of the passage of the Resolution of Intention.
Reference is hereby made to the Monterey County Assessor’s Maps for a detailed description of the lines and dimensions of parcels within the District. The undersigned respectfully submits the enclosed report as directed by the City Council.
Dated this ______ day of ______________, 2024.
DTA
Assessment Engineer
On Behalf of the City of Soledad
By: __________________________________________
Kuda Wekwete
Project Manager
By: __________________________________________
Stephen A. Runk, P.E.
License Number: C23473
82 2
SECTION I
AFFIDAVIT AND CERTIFICATES
City of Soledad
FINAL Engineer’s Report for Diamond Ridge Parks and Open Space MAD No. 1 June 19, 2024 www.FinanceDTA.com
CITY OF SOLEDAD DIAMOND RIDGE PARKS AND OPEN SPACES
MAINTENANCE ASSESSMENT DISTRICT NO. 1
I HEREBY CERTIFY that the enclosed Engineer’s Report, together with the Assessment Diagram thereto attached, was filed with me on the ________ day of ____________, 2024. By: _____________________________ Megan Hunter, City Manager
City of Soledad, Monterey County
I HEREBY CERTIFY that the enclosed Engineer’s Report, together with the Assessment Diagram thereto attached, was approved and confirmed by the City Council of the City of Soledad, California, on the ______ day of _____________, 2024. By: _____________________________ Megan Hunter, City Manager
City of Soledad, Monterey County
83 3
SECTION II
ENGINEER’S REPORT
City of Soledad
FINAL Engineer’s Report for Diamond Ridge Parks and Open Space MAD No. 1 June 19, 2024 www.FinanceDTA.com
II ENGINEER’S REPORT
WHEREAS, the City Council of the City of Soledad (“City”), pursuant to the provisions of the Benefit Assessment Act of 1982, Chapter 64 of Division 2 of the California Government Code (“1982 Act”), adopted its resolution (“Resolution”) initiating proceedings for the levy of Fiscal Year 2024-2025 assessments against properties in the Diamond Ridge Park and Open Space Maintenance Assessment District No. 1 (the “District”) to fund maintenance and operation of street lights and any or all public landscaping and irrigation improvements that have been determined to specially benefit properties in the District (“Improvements”).
WHEREAS, the Resolution designates DTA as Assessment Engineer and directed the Assessment Engineer to prepare and file a report (“Engineer’s Report” or “Report”) pursuant to the 1982 Act and Article XIIID of the California Constitution (“Proposition 218”).
This Report includes the following sections:
Plans and Specifications – Plans and specifications for services to be provided. Plans and specifications are a part of this Report whether or not separately bound.
Cost Estimate – An estimate of the annual cost of services to be provided.
Also included, are administrative and incidental costs that include maintenance, reserve, repairs, and rehabilitation expenses.
Assessment Roll – An assessment roll, showing the amount to be assessed against each parcel of real property within this District and the names and addresses of the property owners. An Assessor’s Parcel number or other designation describes each parcel. Each parcel is also assigned an “assessment number” that links the Assessment Roll to the Assessment Diagram.
Method of Assessment – A statement of the method by which the Assessment Engineer determined the amount to be assessed against each parcel, based on special benefits to be derived by each parcel from the services.
Assessment Diagram – A diagram showing all of the parcels of real property to be assessed within this District. The diagram corresponds with the Assessment Roll by assessment number.
Termination of District/Limitations of Report – A statement as to the duration of the District and the accuracy of the data and information necessary for the development of this annual Report.
NOW THEREFORE, the undersigned, acting as an agent for DTA, Assessment Engineer for the District, by virtue of the power vested under the 1982 Act and the order of the City, 84 4
SECTION II
ENGINEER’S REPORT
City of Soledad
FINAL Engineer’s Report for Diamond Ridge Parks and Open Space MAD No. 1 June 19, 2024 www.FinanceDTA.com
hereby submits this Engineer’s Report and makes the following assessment to cover the portion of the estimated costs of the Improvements, including the incidental costs and expenses, to be paid by the District.
The net assessment in Fiscal Year 2024-2025 is summarized in Table 1.
Table 1: Net Assessment for Fiscal Year 2024-2025
Item Amount
Maintenance Costs $31,329
Administration Costs $38,532
Levy Adjustments (Reserve Fund Debit) $95,013
Net Assessment* $164,874
*Note: Figures may not sum due to rounding. DTA does hereby assess the net amount to be assessed upon all assessable lots or parcels of land within the District by apportioning the amount allocable among the several lots or parcels of each in proportion to the estimated special benefits to be received by each such lot or parcel from the Improvements, as more particularly set forth in the list attached as Appendix A (“Assessment Roll”) and by this reference made as part of this Engineer’s Report.
The District diagram appearing herein is a representation of the assessment diagram that was approved by resolution of the City Council. Reference is hereby made to the Assessor’s Maps of the County of Monterey for Fiscal Year 2024-2025 for a more particular description of the properties within the District. Each parcel of land assessed is described on the Assessment Roll by reference to its parcel number as shown on the County of Monterey Assessment Roll.
DTA
Kuda Wekwete Date
Managing Director
Stephen A. Runk, P.E. Date
License Number: C23473
85 5
SECTION III
PLANS AND SPECIFICATIONS
City of Soledad
FINAL Engineer’s Report for Diamond Ridge Parks and Open Space MAD No. 1 June 19, 2024 www.FinanceDTA.com
III PLANS AND SPECIFICATIONS
The plans, specifications, and studies of the Improvements for this District are voluminous and will not be bound in this Report, but by this reference are incorporated as if attached to this Report. The plans and specifications are on file with the City of Soledad and/or the County of Monterey, California.
A Description of the District
The District is generally bounded by the northerly boundary of Miravale, Phase I Tract Map (Terraza Street) to the north, Gabilan Drive to the south, Orchard Lane to the east, and Toledo Street to the west. A District diagram incorporated herein under Section VII of this Report outlines the boundaries of the District. This diagram incorporates all lots, parcels, and subdivisions of land within the District as the same existed at the time this Report was prepared, a complete listing of which is provided in Appendix A of this Report.
B District Improvements, Facilities, and Services
The following descriptions, provided in the formation documents of the District, identify the types of improvements that will be maintained by the District. Detailed maps and descriptions of these improvements are on file with the City and are available for inspection in the office of the City Engineer and have been incorporated into this Report by reference.
B.1 Street Light Improvements
The maintenance and operations in the District include all street light improvements within the Miravale, Phase I Subdivision.
B.2 Public Landscaping and Irrigation Improvements
Maintenance and operation of any or all public landscaping and irrigation improvements of a local nature on landscaped strips (of land adjacent to curbs within the District) includes the following: jogging paths, planter walls, grass berms, appurtenant irrigation systems, ornamental plantings including lawns, shrubs, and trees; including necessary repairs, replacements, water, electric current, spraying, care, supervision, debris removal, engineering and inspection, and any and all other items of work necessary and incidental for the proper maintenance and operation thereof. Additionally, maintenance and operation includes all additions, improvements, and enlargements which may be made on the previously described work.
Public landscaping and irrigation improvements covered under the maintenance and operations of the District are located on Gabilan Drive and Orchard Lane, and include the strip of land varying in width from face of curb lines (including planter walls) (i) along the north side of Gabilan Drive from Toledo Street to Orchard Lane, and (ii) along the east and west side of Orchard Lane from Gabilan Drive to the north 86 6
SECTION III
PLANS AND SPECIFICATIONS
City of Soledad
FINAL Engineer’s Report for Diamond Ridge Parks and Open Space MAD No. 1 June 19, 2024 www.FinanceDTA.com
limit of Miravale, Phase I Tract Map.
B.3 Storm Water and Park Improvements
Maintenance and operation includes storm retention pond, appurtenant irrigation system, ornamental plantings including lawns, shrubs and trees; including necessary repairs, replacements, water, electric current, spraying, care, supervision, debris removal, and any and all other items of work necessary and incidental for the proper maintenance and operation thereof. Additionally, maintenance and operation includes all additions, improvements, and enlargements which may be made on the previously described work within the following area and on appurtenant improvement plans.
The following improvements are covered under the maintenance and operations of the District: Park Parcel “A” (including a storm water retention pond), San Antonio Park, Santa Barbara Park, and Peverini Park.
B.4 Incidental and Other Expenses
Incidental costs include contingencies and District incidentals such as engineering, printing, notices to property owners, collection costs, legal fees, administration, and supervision.
87 7
SECTION IV
COST ESTIMATE
City of Soledad
FINAL Engineer’s Report for Diamond Ridge Parks and Open Space MAD No. 1 June 19, 2024 www.FinanceDTA.com
IV COST ESTIMATE
Applicable law requires the Engineer’s Report to contain an estimate of the costs of the Improvements for Fiscal Year 2024-2025, including estimates of (i) the total costs for Improvements for Fiscal Year 2024-2025, including incidental expenses, (ii) the amount of any surplus in the improvement fund to be carried over from a previous Fiscal Year, (iii) the amount of any contributions to be made from sources other than assessments levied pursuant to this part, (iv) the amount, if any, of the annual installment for the Fiscal Year where the legislative body has ordered an assessment for the estimated cost of any improvements to be levied and collected in annual installments, and (v) the net amount to be assessed upon assessable lands within the District. Estimates of these amounts are provided below.
The following describes the costs that are funded through the District.
A Costs of Improvements
A.1 Projected Annual Maintenance Costs
Included in the City’s Public Works Department Budget Request are estimated costs for the annual maintenance and servicing of all improvements within the District.
District direct maintenance expenses are estimated at $31,329 for Fiscal Year 2024- 2025 as shown in Table 2 below.
Table 2: Projected Annual Direct Maintenance Costs
Item Description Cost Estimate
Parks/Street/Percolation Pond/ Landscape
Maintenance $15,588
Street Landscape Water Charges $4,563
Park Water Charges $6,644
Park/Landscape Electrical Charges $652
Planter Wall Maintenance $1,825
Sound Wall Reserve $1,435
Street Lighting Electrical and Replacement $621
Reserve Collection/Transfer $0
Total* $31,329
*Note: Figures may not sum due to rounding.
88 8
SECTION IV
COST ESTIMATE
City of Soledad
FINAL Engineer’s Report for Diamond Ridge Parks and Open Space MAD No. 1 June 19, 2024 www.FinanceDTA.com
A.2 Projected Annual Administration Costs
In addition to the costs listed above, there will be costs attributed to the administration of the District. As shown in Table 3, the District administration costs are estimated to be $38,532 for Fiscal Year 2024-2025. These costs are summarized below.
Table 3: Projected Annual Administration Costs
Item Description Cost Estimate
City Administration $27,662
District Administration $5,000
Printing and Advertising $665
County Collection $5,205
Total* $38,532
*Note: Figures may not sum due to rounding.
A.3 Projected Annual Levy Adjustment
Finally, in addition to the costs listed above, certain levy adjustments will be made to account for any operating reserve credits or required capital collections to the District’s reserve fund. As shown in Table 4, an Operating Reserve Collection of $31,497 and the required Capital Reserve Collection of $63,515, resulting in a total of $95,013 Reserve Fund Debit has been applied to the Fiscal Year 2024-2025 assessment.
Table 4: Projected Annual Levy Adjustment
Item Description Cost Estimate
Capital Reserve Collection $63,515
Operating Reserve Debit/Credit $31,497
Total* $95,013
*Note: Figures may not sum due to rounding. B Annual Cost Indexing B.1 City/District Administration, Printing, and Advertising With the passage of Proposition 218, any proposed increase in assessments must be approved by impacted property owners via a mail ballot and public hearing process, similar to these proceedings. A weighted simple majority of ballots received (weighted according to each parcel’s proportionate assessment obligation) must be affirmative for the City Council to confirm and levy the increased assessments. For small assessment districts or districts with relatively low dollar assessments, the cost of an Engineer’s Report, balloting, and the public hearing process can potentially exceed the total amount of the increase. The incidental costs of these proceedings 89 9
SECTION IV
COST ESTIMATE
City of Soledad
FINAL Engineer’s Report for Diamond Ridge Parks and Open Space MAD No. 1 June 19, 2024 www.FinanceDTA.com
may be added to the assessments, resulting in even higher assessments.
Therefore, indexing assessments annually to the published “San Francisco Consumer Price Index for Urban Consumers” (“SF CPI”) allows for minor increases in normal maintenance and operating costs, without incurring the costs of ballot proceedings required by Proposition 218. Any other significant changes to the District (e.g., increases in service, modification of the boundary, etc.) would still require Proposition 218 proceedings and, ultimately, property owner approval.
Thus, on each July 1, commencing on July 1, 2003, the maximum authorized unit assessment rates established in these proceedings will be indexed (increased) annually by a factor equal to the published April SF CPI from the preceding Fiscal Year. The most recent data for the increase in the SF CPI is the increase between April 2023 and April 2024 and shows an increase equal to 3.77%. Therefore, on July 1, 2024, the maximum assessment will thus be increased by 3.77%.
Since the maximum assessment is likely sufficient to cover the cost estimates for improvements and other expenses for Fiscal Year 2024-2025, an amount equal to only the total projected costs will be assessed on the property within the District. The assessment levy in future years may be any amount less than or equal to the maximum assessment in that year.
B.2 Collection Fees
The County Auditor/Controller also charges an additional 0.25% of the total amount assessed.
B.3 Reserve Collection/Transfer
The applicable law provides for a District Reserve Fund that provides for the collection of funds to cover District operations between July 1 (beginning of the Fiscal Year) and the date on which the County remits first installment of assessments collected from the property tax bills (typically January or February). Any negative amounts entries for this budget item represent transfers from the Reserve Fund to reduce the assessment in a given fiscal year. A fully funded Reserve enables the District to (i) cover operational expenses incurred in the six (6) months of the fiscal year, without any City funds from non-District accounts; and (ii) address any unforeseen or unusual expenditures that may occur during the year.
C Contributions from Other Sources
Proposition 218 provides that “an agency shall separate the general benefits from the special benefits conferred…” In accordance with that provision, it is determined that there will be no general benefit from the Improvements in Fiscal Year 2024-2025, as explained in Section VI of this Report.
90 10
SECTION IV
COST ESTIMATE
City of Soledad
FINAL Engineer’s Report for Diamond Ridge Parks and Open Space MAD No. 1 June 19, 2024 www.FinanceDTA.com
D Annual Installments
The entire amount of the net assessment, as shown in Table 5 below, will be assessed in Fiscal Year 2024-2025. E Net Assessment
Pursuant to the foregoing, Table 5 shows the net amount to be assessed upon assessable lands within the District in Fiscal Year 2024-2025. Table 5: Net Assessment for Fiscal Year 2024-2025 Item Total Costs Special Benefit
Allocated Net Assessment
Maintenance Costs (Direct)
Parks/Street/Percolation
Pond/Landscape Maintenance $15,588 100% $15,588
Street Landscape Water Charges $4,563 100% $4,563
Park Water Charges $6,644 100% $6,644
Park/Landscape Electrical Charges $652 100% $652
Planter Wall Maintenance $1,825 100% $1,825
Sound Wall Reserve $1,435 100% $1,435
Street Lighting Electrical and
Replacement $621 100% $621
Reserve Collection/Transfer $0 100% $0
Administration Costs
City Administration $27,662 100% $27,662
District Administration $5,000 100% $5,000
Printing and Advertising $665 100% $665
County Collection $5,205 100% $5,205
Levy Adjustments
Capital Reserve Collection $63,515 100% $63,515
Operating Reserve Debit/Credit $31,497 100% $31,497
Net Assessment* $164,874 N/A $164,874
*Note: Figures may not sum due to rounding.
91 11
SECTION V
ASSESSMENT ROLL
City of Soledad
FINAL Engineer’s Report for Diamond Ridge Parks and Open Space MAD No. 1 June 19, 2024 www.FinanceDTA.com
V ASSESSMENT ROLL
The Assessment Engineer has prepared an Assessment Roll for the District as required by applicable law, based upon the assessment methodology described in this Engineer’s Report. The Assessment Roll includes the net total assessment for Fiscal Year 2024-2025 and shows the Fiscal Year 2024-2025 assessment, assessment number, Assessor’s Parcel Number, and land use designation for each parcel.
The Assessment Roll, as provided in Appendix A, lists the Assessor’s Parcel Numbers within this Assessment District by assessment number. The assessment numbers appearing on the Assessment and the names and addresses of the property owners are as shown on the last equalized assessment roll for taxes or as known to the Assessor of Monterey County.
All parcel information has been provided to DTA by the City Public Works Department, the previous Assessment Engineer, and the County of Monterey. 92 12
SECTION VI
METHOD OF ASSESSMENT
City of Soledad
FINAL Engineer’s Report for Diamond Ridge Parks and Open Space MAD No. 1 June 19, 2024 www.FinanceDTA.com
VI METHOD OF ASSESSMENT
A Background
Pursuant to the 1982 Act, the legislative body establishes and determines the “estimated benefit received” by each parcel from the Improvements.
In addition, Article XIIID of the California Constitution, added in November 1996 through the passage of Proposition 218 by voters of the State of California, requires, inter alia, that (i) only special benefits be assessable, (ii) no assessment may exceed the proportional special benefit conferred on the parcel assessed, and (iii) publicly owned parcels shall not be exempt from assessment unless clear and convincing evidence demonstrates that such publicly owned parcels receive no special benefits from the improvements for which the assessment is levied.
“Special benefit” is a particular and distinct benefit over and above general benefits conferred on real property located in the District or to the public at large. Importantly, the general enhancement of property value does not constitute special benefit. As such, this Engineer’s Report has been designed to comply with these requirements, as well as to incorporate recent California court decisions such as: Silicon Valley Taxpayers Association, Inc. v. Santa Clara County Open Space Authority (2008), Beutz v. County of Riverside (2010), Golden Hills Neighborhood Association v. City of San Diego (2011), and Concerned Citizens v. West Point Fire Protection District (2011). Methodologically, it is necessary and essential to identify the special benefit that the improvements, facilities, and services will render to the properties within the District. It is also necessary that the properties receive a special and direct benefit as distinguished from benefit to the general public.
The Assessment Engineer is appointed for the purpose of analyzing the facts and determining the method and formula for apportionment of the assessment obligation to the benefited properties. For these proceedings, the City has retained the firm of DTA as the Assessment Engineer.
The Assessment Engineer makes his or her recommendation for the method of apportionment in this Engineer’s Report for consideration at the public hearing. However, the final authority and action rests with the City Council after hearing all testimony and evidence presented at the public hearing. Upon conclusion of the public hearing, the City Council must make the final action in determining that the assessment has been made in direct proportion to the special benefit received.
In determining the net amount to be assessed upon parcels within the District, Section 22573 of the California Streets and Highways Code states that such amount “may be apportioned by any formula or method which fairly distributes the net amount among all assessable lots or parcels in proportion to the estimated benefits to be received by each such lot or parcel from the improvements.”
93 13
SECTION VI
METHOD OF ASSESSMENT
City of Soledad
FINAL Engineer’s Report for Diamond Ridge Parks and Open Space MAD No. 1 June 19, 2024 www.FinanceDTA.com
Proposition 218 further states that “no assessment shall be imposed on any parcel which exceeds the reasonable cost of the proportional special benefit conferred on that parcel,” where “special benefit” means “a particular and distinct benefit over and above general benefits conferred on real property located in the District or to the public at large.” This Section VI describes the methodology used to calculate the net amount to be assessed on each parcel within the District in proportion to the special benefit conferred on each such parcel.
B Benefits of Improvements
The benefits associated with the local landscaping improvements are shown in the Table 6 below.
Table 6: Benefits from Landscaping Improvements
Landscaping Improvements
Enhanced desirability of properties through association with the improvements. Improved aesthetic appeal of properties within the District providing a positive representation of the area. Enhanced adaptation of the urban environment within the natural environment from adequate green space and landscaping. Environmental enhancement through improved erosion resistance, and dust and debris control. Increased sense of pride in ownership of property within the District resulting from well-maintained improvements associated with the properties. Reduced criminal activity and property-related crimes (especially vandalism) against properties in the District through well-maintained surroundings and amenities including abatement of graffiti. Enhanced environmental quality of the parcels within the District by moderating temperatures, providing oxygenation, and attenuating noise. The special benefits of street lighting are the convenience, safety, and security of property, improvements, and goods as identified in Table 7 below.
Table 7: Benefits from Street Lighting Improvements
Street Lighting Improvements
Enhanced deterrence of crime and the aid to police protection. Increased nighttime safety on roads and highways. Improved ability of pedestrians and motorists to see. Improved ingress and egress to property. Reduced vandalism and other criminal acts and damage to improvements or property. Improved traffic circulation and reduced nighttime accidents and personal property loss. Increased promotion of business during nighttime hours in the case of commercial properties. 94 14
SECTION VI
METHOD OF ASSESSMENT
City of Soledad
FINAL Engineer’s Report for Diamond Ridge Parks and Open Space MAD No. 1 June 19, 2024 www.FinanceDTA.com
C Categories of Benefit
Proposition 218 provides that “an agency shall separate the general benefits from the special benefits conferred on a parcel,” where “Special Benefit means a particular and distinct benefit over and above general benefits conferred on real property located in the district or to the public at large.” It is therefore necessary to establish definitions of General Benefit and Special Benefit as such terms relate to the benefit to be derived from the Improvements.
The Improvements to be maintained and operated in the District were within or in areas in close proximity to the proposed developed residential lots. As a result, the developed residential lots in the District will receive 100% of the special benefits of the operation and maintenance of the Improvements. These benefits include enhanced neighborhood health and safety, improved quality of life from drainage, flood control and street improvements, protection of improved property, enhanced comfort, and increased desirability of the immediate surroundings of the residential units within the District. Importantly, because of the location of the improvements within or close to the District itself, there is no general benefit to properties outside the District or the community as a whole. Any such general benefit is so incidental and negligible that it cannot be calculated for purposes of assessment.
D Allocation of Special Benefit to Parcels
In accordance with the provisions in the formation documents, the annual maintenance and operation budget is developed for improvements located in the entire Diamond Ridge Subdivision Project. As discussed previously, developed parcels in the District are the only parcels that derive special benefit from maintenance and operations and as such, must bear the cost of these activities. However, it is anticipated that as future subdivisions develop the assessments will be prorated to reflect the District’s proportionate share of the costs of a given operation and maintenance activity.
Importantly, Article XlllD provides that publicly owned properties must be assessed unless there is clear and convincing evidence that those properties receive no special benefit from the assessment. As a result, the following property will be considered exempt from the assessment: areas of public streets, public avenues, public lanes, public roads, public drives, public courts, public alleys, public easements and right-of-way, public greenbelts and public parkways, and that portion of public property that is not developed and used for business purposes similar to private commercial, industrial, and institutional activities.
Factored development unit calculations for residential areas are as follows:
Low Density Single-Family Residential = 1.0 Unit
95 15
SECTION VI
METHOD OF ASSESSMENT
City of Soledad
FINAL Engineer’s Report for Diamond Ridge Parks and Open Space MAD No. 1 June 19, 2024 www.FinanceDTA.com
E Amount of Assessment
Pursuant to the foregoing, Table 8 below shows the net amount to be assessed upon assessable lands within the District in Fiscal Year 2024-2025. Table 8: Fiscal Year 2024-2025 Assessment Rates in the District Assessment Per EDU
Fiscal Year 2023-2024
Assessment Per EDU
Fiscal Year 2024-2025
Max Assessment Per EDU
Fiscal Year 2024-2025
$457.89 $475.14 $475.14
96 16
SECTION VI
METHOD OF ASSESSMENT
City of Soledad
FINAL Engineer’s Report for Diamond Ridge Parks and Open Space MAD No. 1 June 19, 2024 www.FinanceDTA.com
Table 9: Fiscal Year 2024-2025 Cost Estimate
Description Total Amount ($)
Special Benefit
Apportioned to
District
Fiscal Year 2024-2025
Total Budget
(Amount Funded to District)
(A) Annual Maintenance (Direct Costs)
Operating Expenses
Parks/Street/Percolation Pond/ Landscape Maintenance $15,588.12 100% $15,588.12 Street Landscape Water Charges $4,563.36 100% $4,563.36 Park Water Charges $6,644.31 100% $6,644.31
Park/Landscape Electrical Charges $652.26 100% $652.26
Planter Wall Maintenance $1,825.35 100% $1,825.35
Sound Wall Reserve (Replacement & Painting -$15K every 5 yrs.) $1,434.72 100% $1,434.72 Street Lighting Electrical & Replacement $620.90 100% $620.90 Reserve Collection / (Transfer) $0.00 100% $0.00
(B) Administration
City Administration $27,662.33 100% $27,662.33
District Administration $5,000.00 100% $5,000.00
Printing & Advertising $664.56 100% $664.56
County Collection $5,205.00 100% $5,205.00
Subtotal (A+B) $69,860.91 N/A $69,860.91
(C) Levy Adjustments
Capital Reserve Collection
Santa Barbara Park ($160,000 Total) $29,671.67
Peverini Park ($105,000 Total) $18,095.17
Other Improvements $15,748.61
Operating Reserve Transfer In/(Out) $31,497.21
Balance to Levy (A+B+C) N/A N/A $164,873.58
(D) District Assessment
Total EDUs Count 347
Total Parcels Count 347
Total Parcels Levied 347
FY 2024-2025 Calculated Assessment per EBU $475.14
FY 2024-2025 Maximum Assessment per EBU $475.14
FY 2024-2025 Maximum Levy $164,873.58
(E) Fund Balance Information
Beginning Fund Balance FY 2024 -2025 $389,802.55
Reserve Fund Adjustments $95,012.67
Anticipated Ending Balance FY 2024-2025 $484,815.22
City of Soledad
Engineer's Report
Diamond Ridge Parks and Open Space Maintenance Assessment District No.1 - Fund #650 Fiscal Year 2024-2025 Cost Estimate
97 17
SECTION VII
ASSESSMENT DIAGRAM AND
BOUNDARY MAP
City of Soledad
FINAL Engineer’s Report for Diamond Ridge Parks and Open Space MAD No. 1 June 19, 2024 www.FinanceDTA.com
VII ASSESSMENT DIAGRAM AND BOUNDARY MAP
The boundary map for the District has been previously approved and submitted to the City in the format required by the 1972 Act and is on file in the Office of the City Clerk.
The parcels within the District generally consist of the lots, parcels, and subdivisions of land found within the following District Diagram and are based on the Monterey County Assessor’s Maps and the Monterey County Assessor’s information that existed at the time this Report was prepared.
Figure 1: Assessment Diagram
98 18
SECTION VIII
TERMINATION OF
DISTRICT/LIMITATIONS OF
REPORT
City of Soledad
FINAL Engineer’s Report for Diamond Ridge Parks and Open Space MAD No. 1 June 19, 2024 www.FinanceDTA.com
VIII TERMINATION OF DISTRICT/LIMITATIONS OF REPORT
A Termination of District
Assessments associated with the District will be levied each Fiscal Year until the District is dissolved by the City Council.
B Limitations of Report
The conclusions, calculations, and recommendations in this Report rely on the substantial data and information provided to DTA at the time of the writing of the Report by the following parties:
1. City of Soledad, specifically the Public Works Department;
2. The previous Assessment Engineer; and
3. The County of Monterey.
99 APPENDIX A
City of Soledad
Diamond Ridge Parks and Open Space
Maintenance Assessment District No. 1
Fiscal Year 2024-2025
ASSESSMENT ROLL
100
99 ALMADEN BLVD., SUITE 875
SAN JOSE, CA 95113
PHONE: (800) 969-4DTA
Public Finance
Public-Private Partnerships
Development Economics
Clean Energy Bonds
www.FinanceDTA.com
101
DRAFT – FOR REVIEW
RESOLUTION NO. 6107
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SOLEDAD ORDERING
THE LEVY AND COLLECTION OF ASSESSMENTS WITHIN THE PARKS AND OPEN SPACE MAINTENANCE ASSESSMENT DISTRICT NO. 1 ANNEXATION NO. 1 (ORCHARD VILLAS/MIRAVALE II) FOR FISCAL YEAR 2024/2025
The City Council of the City of Soledad, California (hereinafter referred to as the “City”) does resolve as follows:
WHEREAS, the City Council has by previous Resolutions initiated proceedings and declared its intention to levy assessments for the Parks and Open Space Maintenance Assessment District No. 1 as Annexation No. 1, Orchard Villas/Miravale II (hereafter referred to as the “District”) for the fiscal year commencing July 1, 2024 and ending June 30, 2025 pursuant to the provisions of the Landscaping and Lighting Act of 1972, Part 2 of Division 15 of the California Streets and Highways Code, commencing with Section 22500 (hereafter referred to as the "Act") to pay the costs and expenses of operating, maintaining, and servicing improvements and facilities located within the boundaries of the District; and,
WHEREAS, DTA has prepared and filed with the City Clerk, and the City Clerk has presented to the Council, the Engineer’s Annual Levy Report (hereafter referred to as the “Report”) for the District that describes the District and the proposed levy and collection of assessments upon eligible parcels of land within the District, and the Council did by previous Resolution give preliminary approval of said Report; and,
WHEREAS, the City Council desires to levy and collect assessments against parcels of land within the District for the fiscal year commencing July 1, 2024 and ending June 30, 2025 to pay the costs and expenses of operating, maintaining, and servicing improvements and facilities located within the boundaries of the District; and,
WHEREAS, this City and DTA have reviewed the provisions of Section XIIID of the California State Constitution and found that the proposed assessments comply with these provisions.
NOW, THEREFORE, BE IT RESOLVED, DETERMINED, AND ORDERED BY
THE CITY COUNCIL OF THE CITY OF SOLEDAD FOR THE PARKS AND OPEN SPACES MAINTENANCE ASSESSMENT DISTRICT NO. 1 AS ANNEXATION NO. 1 (ORCHARD VILLAS/MIRAVALE II) AS FOLLOWS:
Section 1 Following notice duly given, the City Council has held a full and fair Public Hearing regarding the District, the levy and collection of assessments, the Report prepared in connection therewith, and considered all oral and written statements, protests, and communications made or filed by interested persons regarding these matters.
Section 2 Based upon its review (and amendments, as applicable) of the Report, the City Council hereby finds and determines that:
i) the land within the District will receive special benefit by the operation, maintenance, and servicing of improvements and facilities located within the boundaries of the District; and,
102
DRAFT – FOR REVIEW
ii) the District includes all of the lands so benefited; and, iii) the net amount to be assessed upon the lands within the District in accordance with the fee for the fiscal year commencing July 1, 2024 and ending June 30, 2025 is apportioned by a formula and method which fairly distributes the net amount among all eligible parcels in proportion to the estimated benefits to be received by each parcel from the improvements and services. This Fiscal Year assessment for the Parks and Open Spaces Maintenance Assessment District No. 1 as Annexation No. 1 (Orchard Villas/Miravale II) is $610.57 per parcel.
Section 3 The Report and assessments as presented to the City Council and on file in the Office of the City Clerk are hereby confirmed as filed and approved by the City Council.
Section 4 The maintenance, operation, and servicing of the improvements and appurtenant facilities shall be performed pursuant to the Act. The City Council hereby orders the proposed improvements to be made, which improvements are briefly described as follows: the maintenance, servicing, including repair, replacement, removal, and operation of landscape improvements, park maintenance, graffiti removal, water for irrigation and fountains, and associated appurtenances located within the public right-of-way and dedicated landscape easements and parks, including retention pond. Improvements within the District are generally parks, parkways and block walls located throughout the Orchard Villas and Miravale II developments. These improvements include turf, ground cover, shrubs and trees, irrigation systems, graffiti removal, and walkways. Services provided include all necessary service, operations, and maintenance required to keep the improvements in a healthy, vigorous condition and in proper working order. The Report describes all new improvements or substantial changes in existing improvements.
Section 5 The County Auditor of the County of Monterey shall enter on the County Assessment Roll opposite each eligible parcel of land the amount of levy so apportioned by the formula and method outlined in the Report, and such levies shall be collected at the same time and in the same manner as the County taxes are collected pursuant to Chapter 4, Article 2, Section 22646 of the Act. After collection by the County, the net amount of the levy shall be paid to the City Treasurer.
Section 6 The City Treasurer shall deposit all money representing assessments collected by the County for the District to the credit of a fund known as the "Improvement Fund, City of Soledad, Parks and Open Space Maintenance Assessment District No. 1 as Annexation No. 1, as Orchard Villas/Miravale II” and such monies shall be expended only for the maintenance, operation, and servicing improvements and facilities as described in Section 4.
Section 7 The adoption of this Resolution constitutes the District levy for the fiscal year commencing July 1, 2024 and ending June 30, 2025.
Section 8 The City Clerk or their designate is hereby authorized and directed to file the levy with the County Auditor upon adoption of this Resolution pursuant to Chapter 4, Article 1, Section 22641 of the Act.
103
DRAFT – FOR REVIEW
PASSED, APPROVED and ADOPTED this 19th day of June 2024 by the following vote:
AYES, and in favor thereof, Councilmembers:
NOES, Councilmembers:
ABSENT, Councilmembers:
ABSTAIN, Councilmembers:
ANNA M. VELAZQUEZ, Mayor
ATTEST:
____________________________________
MEGAN HUNTER, City Manager
104
Irvine | San Jose | San Francisco | Riverside
Dallas | Houston | Raleigh | Tampa
www.FinanceDTA.com
Public Finance
Public-Private Partnerships
Development Economics
Clean Energy Bonds
FINAL ENGINEER’S REPORT
ORCHARD VILLAS/MIRAVALE II
PARKS AND OPEN SPACE MAINTENANCE
ASSESSMENT DISTRICT NO. 1,
ANNEXATION NO. 1
FUND #651
CITY OF SOLEDAD | COUNTY OF MONTEREY
Beginning Fiscal Year: 2024-2025
Intent Meeting: May 15, 2024
Public Hearing: June 19, 2024
Reso. 6107
105
www.FinanceDTA.com
99 Almaden Blvd, Suite 875
San Jose, CA 95113
CITY COUNCIL AND STAFF
MAYOR
Anna M. Velazquez
MAYOR PRO TEMPORE
Maria Corralejo
COUNCIL MEMBERS
Fernando Cabrera
Fernando Ansaldo-Sanchez
PUBLIC WORKS DIRECTOR
Donald Wilcox, P.E. PROFESSIONAL SERVICES
ASSESSMENT ENGINEERING
Stephen A. Runk, P.E.
DTA
106
TABLE
OF CONTENTS
SECTION PAGE
I AFFIDAVIT AND CERTIFICATES............................1 II ENGINEER’S REPORT.............................................. 3 III PLANS AND SPECIFICATIONS.............................. 5 A Description of the District ............................................5 B District Improvements, Facilities, and
Services .............................................................................5 IV COST ESTIMATE...................................................... 7 A Costs of Improvements ................................................. 7 B Annual Cost Indexing ....................................................8 C Contributions from Other Sources.............................9 D Annual Installments .......................................................9 E Net Assessment...............................................................9 V ASSESSMENT ROLL................................................11 VI METHOD OF ASSESSMENT ................................. 12 A Background....................................................................12 B Benefits of Improvements ..........................................13 C Categories of Benefit ...................................................14 D Allocation of Special Benefit to Parcels...................15 E Amount of Assessment................................................16
VII ASSESSMENT DIAGRAM AND
BOUNDARY MAP ................................................... 18
VIII TERMINATION OF
DISTRICT/LIMITATIONS OF REPORT ............... 19
A Termination of District................................................19 B Limitations of Report...................................................19
APPENDICES
APPENDIX A ASSESSMENT ROLL
107
1 SECTION I
AFFIDAVIT AND CERTIFICATES
City of Soledad June 19, 2024
FINAL Engineer’s Report for Orchard Villas/Miravale II MAD No. 1, Annexation No. 1 www.FinanceDTA.com
I AFFIDAVIT AND CERTIFICATES
CITY OF SOLEDAD PARKS AND OPEN SPACE
MAINTENANCE ASSESSMENT DISTRICT NO. 1
ANNEXATION NO. 1, ORCHARD VILLAS/MIRAVALE II
This Engineer’s Report (“Report”) and the enclosed descriptions, budget, and assessment diagram outlines the District and includes the proposed assessments for each lot, parcel, and subdivision of land within said District to be levied for Fiscal Year 2024-2025 as they existed at the time of the passage of the Resolution of Intention.
Reference is hereby made to the Monterey County Assessor’s Maps for a detailed description of the lines and dimensions of parcels within the District. The undersigned respectfully submits the enclosed report as directed by the City Council.
Dated this ______ day of ______________, 2024.
DTA
Assessment Engineer
On Behalf of the City of Soledad
By: __________________________________________
Kuda Wekwete
Project Manager
By: __________________________________________
Stephen A. Runk, P.E.
License Number: C23473
108
2 SECTION I
AFFIDAVIT AND CERTIFICATES
City of Soledad June 19, 2024
FINAL Engineer’s Report for Orchard Villas/Miravale II MAD No. 1, Annexation No. 1 www.FinanceDTA.com
CITY OF SOLEDAD PARKS AND OPEN SPACE
MAINTENANCE ASSESSMENT DISTRICT NO. 1
ANNEXATION NO. 1, ORCHARD VILLAS/MIRAVALE II
I HEREBY CERTIFY that the enclosed Engineer’s Report, together with the Assessment Diagram thereto attached, was filed with me on the ________ day of ____________, 2024. By: _____________________________ Megan Hunter, City Manager
City of Soledad, Monterey County
I HEREBY CERTIFY that the enclosed Engineer’s Report, together with the Assessment Diagram thereto attached, was approved and confirmed by the City Council of the City of Soledad, California, on the ______ day of _____________, 2024. By: _____________________________ Megan Hunter, City Manager
City of Soledad, Monterey County
109
3 SECTION II
ENGINEER’S REPORT
City of Soledad June 19, 2024
FINAL Engineer’s Report for Orchard Villas/Miravale II MAD No. 1, Annexation No. 1 www.FinanceDTA.com
II ENGINEER’S REPORT
WHEREAS, the City Council of the City of Soledad (“City”), pursuant to the provisions of the Landscaping and Lighting Act of 1972, Part 2 of Division 15 of the California Streets and Highways Code (the “1972 Act”), adopted its resolution (“Resolution”) initiating proceedings for the levy of Fiscal Year 2024-2025 assessments against properties in the Orchard Villas/Miravale II Parks and Open Space Maintenance Assessment District No. 1, Annexation No. 1 (the “District”) to fund maintenance and operation of park, landscape, and street light improvements within City streets, that have been determined to specially benefit the District (“Improvements”).
WHEREAS, the Resolution designates DTA as Assessment Engineer and directed the Assessment Engineer to prepare and file a report (“Engineer’s Report” or “Report”) pursuant to the 1972 Act and Article XIIID of the California Constitution (“Proposition 218”).
This Report includes the following sections:
Plans and Specifications – Plans and specifications for services to be provided. Plans and specifications are a part of this Report whether or not separately bound.
Cost Estimate – An estimate of the annual cost of services to be provided. Also included, are administrative and incidental costs that include maintenance, reserve, repairs, and rehabilitation expenses.
Assessment Roll – An assessment roll, showing the amount to be assessed against each parcel of real property within this District and the names and addresses of the property owners. An Assessor’s Parcel number or other designation describes each parcel. Each parcel is also assigned an “assessment number” that links the Assessment Roll to the Assessment Diagram.
Method of Assessment – A statement of the method by which the Assessment Engineer determined the amount to be assessed against each parcel, based on special benefits to be derived by each parcel from the Improvements.
Assessment Diagram – A diagram showing all of the parcels of real property to be assessed within this District. The diagram corresponds with the Assessment Roll by assessment number.
Termination of District/Limitations of Report – A statement as to the duration of the District and the accuracy of the data and information necessary for the development of this annual Report.
NOW THEREFORE, the undersigned, acting as an agent for DTA, Assessment Engineer for the District, by virtue of the power vested under the 1972 Act and the order of the City, hereby submits this Engineer’s Report and makes the following assessment to cover the portion of the estimated costs of the Improvements, including the incidental costs and expenses, to be paid by the District.
110
4 SECTION II
ENGINEER’S REPORT
City of Soledad June 19, 2024
FINAL Engineer’s Report for Orchard Villas/Miravale II MAD No. 1, Annexation No. 1 www.FinanceDTA.com
The net assessment in Fiscal Year 2024-2025 is summarized in Table 1.
Table 1: Net Assessment for Fiscal Year 2024-2025
Item Amount
Maintenance Costs $345,190
Administration Costs $38,800
Levy Adjustments (Reserve Fund Credit/Debit) ($45,000)
Net Assessment* $338,991
*Note: Figures may not sum due to rounding. DTA does hereby assess the net amount to be assessed upon all assessable lots or parcels of land within the District by apportioning the amount allocable among the several lots or parcels of each in proportion to the estimated special benefits to be received by each such lot or parcel from the Improvements, as more particularly set forth in the list attached as Appendix A (“Assessment Roll”) and by this reference made as part of this Engineer’s Report.
The District diagram appearing herein is a representation of the assessment diagram that was approved by resolution of the City Council. Reference is hereby made to the Assessor’s Maps of the County of Monterey for Fiscal Year 2024-2025 for a more particular description of the properties within the District. Each parcel of land assessed is described on the Assessment Roll by reference to its parcel number as shown on the County of Monterey Assessment Roll.
DTA
Kuda Wekwete Date
Managing Director
Stephen A. Runk, P.E. Date
License Number: C23473
111
5 SECTION III
PLANS AND SPECIFICATIONS
City of Soledad June 19, 2024
FINAL Engineer’s Report for Orchard Villas/Miravale II MAD No. 1, Annexation No. 1 www.FinanceDTA.com
III PLANS AND SPECIFICATIONS
The plans, specifications, and studies of the Improvements for this District are voluminous and will not be bound in this Report, but by this reference are incorporated as if attached to this Report. The plans and specifications are on file with the City of Soledad and/or the County of Monterey, California.
A Description of the District
The District is generally located between Orchard Lane and Granada Street, south of Gabilan Drive, west of Bryant Canyon Road, and east of Orchard Lane. A District diagram incorporated herein under Section VII of this Report outlines the boundaries of the District.
This diagram incorporates all lots, parcels, and subdivisions of land within the District as the same existed at the time this Report was prepared, a complete listing of which is provided in Appendix A of this Report.
B District Improvements, Facilities, and Services
The following descriptions, provided in the formation documents of the District, identify the types of improvements that will be maintained by the District. Detailed maps and descriptions of these improvements are on file with the City and are available for inspection in the office of the City Engineer and have been incorporated into this Report by reference.
B.1 Landscape Improvements
Maintenance and operation includes maintenance, servicing (including repair, replacement, removal), and operation of landscape improvements, park maintenance, graffiti removal, water for irrigation and fountains, and associated appurtenances located within the public right-of-way and dedicated landscape easements.
These maintenance and operation activities are generally performed on parkways and block walls located throughout the Orchard Villas and Miravale II developments.
Currently the proposed Improvements to be maintained include:
A total of 13,343 square feet of landscaping, plus a future 61-acre park (parcel “G”), located in Orchard Villas; and
A total of 65,790 square feet of landscaping plus a future 7.91-acre park located in Miravale II.
B.2 Street Light Improvements
Maintenance and operation related to street light improvements includes (i) the maintenance, operation, and servicing of local street lights within approximately 90 feet to certain lots and parcels and therefore provides a direct special benefit to such lots or parcels; and (ii) the maintenance, operation, and servicing of arterial street lights that provide a special benefit to all the assessable parcels within the District 112
6 SECTION III
PLANS AND SPECIFICATIONS
City of Soledad June 19, 2024
FINAL Engineer’s Report for Orchard Villas/Miravale II MAD No. 1, Annexation No. 1 www.FinanceDTA.com
whether or not such parcels are in close proximity to such lighting.
Importantly, the improvements that are covered under these maintenance and operation activities include:
Within Orchard Villas, street lights along Orchard Lane, Villa Street, Tomasini Trail, Tankersley Street Luchessa Way, Serra Court, Rusconi Court, Camino Arroyo, Davalos Lane, Luna Drive, and Calle Valverde; and Within Miravale II, street lights along Bryant Canyon Road, Santa Clara, San Rafael, San Gabriel, La Colina Street, San Antonio, Jones, Westcott, Binsacca, Gabilan Drive, Rojos Way, Rusconi Court, Asilomar Street, Orchard Lane, and additional streets within the Miravale II development that are not named at this time.
B.3 Incidental and Other Expenses
Incidental costs include contingencies and assessment district incidentals such as engineering, printing, notices to property owners, collection costs, legal fees, administration, and supervision.
113
7 SECTION IV
COST ESTIMATE
City of Soledad June 19, 2024
FINAL Engineer’s Report for Orchard Villas/Miravale II MAD No. 1, Annexation No. 1 www.FinanceDTA.com
IV COST ESTIMATE
Applicable law requires the Engineer’s Report to contain an estimate of the costs of the Improvements for Fiscal Year 2024-2025, including estimates of (i) the total costs for Improvements for Fiscal Year 2024-2025, including incidental expenses, (ii) the amount of any surplus in the improvement fund to be carried over from a previous Fiscal Year, (iii) the amount of any contributions to be made from sources other than assessments levied pursuant to this part, (iv) the amount, if any, of the annual installment for the Fiscal Year where the legislative body has ordered an assessment for the estimated cost of any improvements to be levied and collected in annual installments, and (v) the net amount to be assessed upon assessable lands within the District. Estimates of these amounts are provided below.
The following describes the costs that are funded through the District.
A Costs of Improvements
A.1 Projected Annual Maintenance Costs
Included in the City’s Public Works Department Budget Request are estimated costs for the annual maintenance and servicing of all improvements within the District.
District direct maintenance expenses are estimated at $345,190 for Fiscal Year 2024- 2025 as shown in Table 2 below.
Table 2: Projected Annual Direct Maintenance Costs
Item Description Cost Estimate
Landscape Maintenance (Easements) $150,071
Park Maintenance $101,100
Street Lights $72,491
Graffiti $21,528
Reserve Collection/(Transfer) $0
Total* $345,190
*Note: Figures may not sum due to rounding.
A.2 Projected Annual Administration Costs
In addition to the costs listed above, there will be costs attributed to the administration of the District. As shown in Table 3, the District administration costs are estimated to be $38,800 for Fiscal Year 2024-2025. These costs are summarized below.
114
8 SECTION IV
COST ESTIMATE
City of Soledad June 19, 2024
FINAL Engineer’s Report for Orchard Villas/Miravale II MAD No. 1, Annexation No. 1 www.FinanceDTA.com
Table 3: Projected Annual Administration Costs
Item Description Cost Estimate
City Administration $29,198
District Administration $5,282
Printing and Advertising $647
County Collection $3,673
Total* $38,800
*Note: Figures may not sum due to rounding.
A.3 Projected Annual Levy Adjustment
Finally, in addition to the costs listed above, certain levy adjustments will be made to account for any operating reserve credits or required capital collections to the District’s reserve fund. As shown in Table 4, an Operating Reserve Credit of $45,000 has been applied to offset the required Capital Reserve Collection. Therefore, a net total of $45,000 Reserve Fund Credit has been applied to the Fiscal Year 2024-2025 assessment.
Table 4: Projected Annual Levy Adjustment
Item Description Cost Estimate
Capital Reserve Collection $0
Operating Reserve Credit ($45,000)
Total ($45,000)
B Annual Cost Indexing
B.1 City/District Administration, Printing, and Advertising With the passage of Proposition 218, any proposed increase in assessments must be approved by impacted property owners via a mail ballot and public hearing process, similar to these proceedings. A weighted simple majority of ballots received (weighted according to each parcel’s proportionate assessment obligation) must be affirmative for the City Council to confirm and levy the increased assessments. For small assessment districts or districts with relatively low dollar assessments, the cost of an Engineer’s Report, balloting, and the public hearing process can potentially exceed the total amount of the increase. The incidental costs of these proceedings may be added to the assessments, resulting in even higher assessments.
Therefore, indexing assessments annually to the published “San Francisco Consumer Price Index for Urban Consumers” (“SF CPI”) allows for minor increases in normal maintenance and operating costs, without incurring the costs of ballot proceedings required by Proposition 218. Any other significant changes to the District (e.g., increases in service, modification of the boundary, etc.) would still require Proposition 218 proceedings and, ultimately, property owner approval. 115
9 SECTION IV
COST ESTIMATE
City of Soledad June 19, 2024
FINAL Engineer’s Report for Orchard Villas/Miravale II MAD No. 1, Annexation No. 1 www.FinanceDTA.com
Thus, on each July 1, commencing on July 1, 2007, the maximum authorized unit assessment rates established in these proceedings will be indexed (increased) annually by a factor equal to the published SF CPI from the preceding Fiscal Year.
The most recent data for the increase in the SF CPI is the increase between February 2023 and February 2024 and shows an increase equal to 2.37%. Therefore, on July 1, 2024, the maximum assessment will thus be increased by 2.37%.
Since the maximum assessment is likely sufficient to cover the cost estimates for improvements and other expenses for Fiscal Year 2024-2025, an amount equal to only the total projected costs will be assessed on the property within the District.
The assessment levy in future years may be any amount less than or equal to the maximum assessment in that year.
B.2 Collection Fees
The County Auditor/Controller also charges an additional 0.25% of the total amount assessed.
B.3 Reserve Collection/Transfer
The applicable law provides for a District Reserve Fund that provides for the collection of funds to cover District operations between July 1 (beginning of the Fiscal Year) and the date on which the County remits first installment of assessments collected from the property tax bills (typically January or February). Any negative amounts entries for this budget item represent transfers from the Reserve Fund to reduce the assessment in a given fiscal year. A fully funded Reserve enables the District to (i) cover operational expenses incurred in the six (6) months of the fiscal year, without any City funds from non-District accounts; and (ii) address any unforeseen or unusual expenditures that may occur during the year.
C Contributions from Other Sources
Proposition 218 provides that “an agency shall separate the general benefits from the special benefits conferred…” In accordance with that provision, it is determined that there will be no general benefit from the Improvements in Fiscal Year 2024-2025, as explained in Section VI of this Report.
D Annual Installments
The entire amount of the net assessment, as shown in Table 5 below, will be assessed in Fiscal Year 2024-2025. E Net Assessment
Pursuant to the foregoing, Table 5 shows the net amount to be assessed upon assessable lands within the District in Fiscal Year 2024-2025.
116
10 SECTION IV
COST ESTIMATE
City of Soledad June 19, 2024
FINAL Engineer’s Report for Orchard Villas/Miravale II MAD No. 1, Annexation No. 1 www.FinanceDTA.com
Table 5: Net Assessment for Fiscal Year 2024-2025
Item Total Costs
Special
Benefit
Allocated
Net
Assessment
Maintenance Costs (Direct)
Landscape Maintenance(Easements) $150,071 100% $150,071 Park Maintenance $101,100 100% $101,100
Street Lights $72,491 100% $72,491
Graffiti $21,528 100% $21,528
Reserve Collection/(Transfer) $0 100% $0
Administration Costs
City Administration $29,198 100% $29,198
District Administration $5,282 100% $5,282
Printing and Advertising $647 100% $647
County Collection $3,673 100% $3,673
Levy Adjustments
Capital Reserve Collection $0 100% $0
Operating Reserve Credit ($45,000) 100% ($45,000)
Net Assessment* $338,991 N/A $338,991
*Note: Figures may not sum due to rounding.
117
11 SECTION V
ASSESSMENT ROLL
City of Soledad June 19, 2024
FINAL Engineer’s Report for Orchard Villas/Miravale II MAD No. 1, Annexation No. 1 www.FinanceDTA.com
V ASSESSMENT ROLL
The Assessment Engineer has prepared an Assessment Roll for the District as required by applicable law, based upon the assessment methodology described in this Engineer’s Report. The Assessment Roll includes the net total assessment for Fiscal Year 2024-2025 and shows the Fiscal Year 2024-2025 assessment, assessment number, Assessor’s Parcel Number, and land use designation for each parcel.
The Assessment Roll, as provided in Appendix A, lists the Assessor’s Parcel Numbers within this Assessment District by assessment number. The assessment numbers appearing on the Assessment and the names and addresses of the property owners are as shown on the last equalized assessment roll for taxes or as known to the Assessor of Monterey County.
All parcel information has been provided to DTA by the City Public Works Department, the previous Assessment Engineer, and the County of Monterey. 118
12 SECTION VI
METHOD OF ASSESSMENT
City of Soledad June 19, 2024
FINAL Engineer’s Report for Orchard Villas/Miravale II MAD No. 1, Annexation No. 1 www.FinanceDTA.com
VI METHOD OF ASSESSMENT
A Background
Pursuant to the 1972 Act, the legislative body establishes and determines the “estimated benefit received” by each parcel from the Improvements.
In addition, Article XIIID of the California Constitution, added in November 1996 through the passage of Proposition 218 by voters of the State of California, requires, inter alia, that (i) only special benefits be assessable, (ii) no assessment may exceed the proportional special benefit conferred on the parcel assessed, and (iii) publicly owned parcels shall not be exempt from assessment unless clear and convincing evidence demonstrates that such publicly owned parcels receive no special benefits from the improvements for which the assessment is levied.
“Special benefit” is a particular and distinct benefit over and above general benefits conferred on real property located in the District or to the public at large. Importantly, the general enhancement of property value does not constitute special benefit. As such, this Engineer’s Report has been designed to comply with these requirements, as well as to incorporate recent California court decisions such as: Silicon Valley Taxpayers Association, Inc. v. Santa Clara County Open Space Authority (2008), Beutz v. County of Riverside (2010), Golden Hills Neighborhood Association v. City of San Diego (2011), and Concerned Citizens v. West Point Fire Protection District (2011). Methodologically, it is necessary and essential to identify the special benefit that the improvements, facilities, and services will render to the properties within the District. It is also necessary that the properties receive a special and direct benefit as distinguished from benefit to the general public.
The Assessment Engineer is appointed for the purpose of analyzing the facts and determining the method and formula for apportionment of the assessment obligation to the benefited properties. For these proceedings, the City has retained the firm of DTA as the Assessment Engineer.
The Assessment Engineer makes his or her recommendation for the method of apportionment in this Engineer’s Report for consideration at the public hearing. However, the final authority and action rests with the City Council after hearing all testimony and evidence presented at the public hearing. Upon conclusion of the public hearing, the City Council must make the final action in determining that the assessment has been made in direct proportion to the special benefit received.
In determining the net amount to be assessed upon parcels within the District, Section 22573 of the California Streets and Highways Code states that such amount “may be apportioned by any formula or method which fairly distributes the net amount among all assessable lots or parcels in proportion to the estimated benefits to be received by each such lot or parcel from the improvements.”
119
13 SECTION VI
METHOD OF ASSESSMENT
City of Soledad June 19, 2024
FINAL Engineer’s Report for Orchard Villas/Miravale II MAD No. 1, Annexation No. 1 www.FinanceDTA.com
Proposition 218 further states that “no assessment shall be imposed on any parcel which exceeds the reasonable cost of the proportional special benefit conferred on that parcel,” where “special benefit” means “a particular and distinct benefit over and above general benefits conferred on real property located in the District or to the public at large.” This Section VI describes the methodology used to calculate the net amount to be assessed on each parcel within the District in proportion to the special benefit conferred on each such parcel.
B Benefits of Improvements
The special benefits associated with the local landscaping improvements are shown in the Table 6 below.
Table 6: Benefits from Landscaping Improvements
Landscaping Improvements
Enhanced desirability of properties through association with the improvements. Improved aesthetic appeal of properties within the District providing a positive representation of the area. Enhanced adaptation of the urban environment within the natural environment from adequate green space and landscaping. Environmental enhancement through improved erosion resistance, and dust and debris control. Increased sense of pride in ownership of property within the District resulting from well-maintained improvements associated with the properties. Reduced criminal activity and property-related crimes (especially vandalism) against properties in the District through well-maintained surroundings and amenities including abatement of graffiti. Enhanced environmental quality of the parcels within the District by moderating temperatures, providing oxygenation, and attenuating noise. The special benefits of street lighting are the convenience, safety, and security of property, improvements, and goods as identified in Table 7 below.
Table 7: Benefits from Street Lighting Improvements
Street Lighting Improvements
Enhanced deterrence of crime and the aid to police protection. Increased nighttime safety on roads and highways. Improved ability of pedestrians and motorists to see. Improved ingress and egress to property. Reduced vandalism and other criminal acts and damage to improvements or property. Improved traffic circulation and reduced nighttime accidents and personal property loss. Increased promotion of business during nighttime hours in the case of commercial properties. 120
14 SECTION VI
METHOD OF ASSESSMENT
City of Soledad June 19, 2024
FINAL Engineer’s Report for Orchard Villas/Miravale II MAD No. 1, Annexation No. 1 www.FinanceDTA.com
C Categories of Benefit
Proposition 218 provides that “an agency shall separate the general benefits from the special benefits conferred on a parcel,” where “Special Benefit means a particular and distinct benefit over and above general benefits conferred on real property located in the district or to the public at large.” It is therefore necessary to establish definitions of General Benefit and Special Benefit as such terms relate to the benefit to be derived from the Improvements.
The following special benefit allocation was determined at the time the District was formed.
C.1 Landscaping
Proper maintenance of landscaping and appurtenant facilities specially benefit parcels within the District by moderating temperatures, providing oxygenation, attenuating noise from adjacent streets, and controlling dust for those properties in close proximity to the landscaping, thereby enhancing the environmental quality of the parcels and making them more desirable; Spraying and treating of landscaping for disease reduces the likelihood of insect infestation and other diseases spreading to landscaping located throughout the properties within the District; and
Proper maintenance of the landscaping, ornamental structures, and appurtenant facilities (i) reduces property-related crimes (especially vandalism) against properties in the District through the abatement of graffiti and the screening of properties within the Annexation from arterial streets; and (ii) improves the attractiveness of properties within the District and provides a positive visual experience.
C.2 Street Lighting
The special benefit from the maintenance, operation, and servicing of street lighting within the District only accrues to parcels within the District located in areas where such lighting is provided. Therefore, parcels within the District, regardless of location, are considered to benefit from such improvements installed within the District.
C.3 Parks
The special benefit from the maintenance of park improvements is determined based on the potential use by the property owners within the District. Based on City standards, it has been determined that each parcel within the District will benefit from one-tenth (1/10) of each acre of developed parkland within the City. Using this projection, the total number of acres, and future population, only approximately 80% of the proposed parks maintenance within the Annexations will be assessed towards the Annexation parcels.
121
15 SECTION VI
METHOD OF ASSESSMENT
City of Soledad June 19, 2024
FINAL Engineer’s Report for Orchard Villas/Miravale II MAD No. 1, Annexation No. 1 www.FinanceDTA.com
As a result, properties in the District will receive 100% of the special benefits of the operation and maintenance of the Improvements. Importantly, because of the location of the Improvements within or close to the District itself, there is no general benefit to properties outside the District or the community as a whole. Any such general benefit is so incidental and negligible that it cannot be calculated for purposes of assessment.
D Allocation of Special Benefit to Parcels
Each fiscal year, the Maximum Assessment Rate per EDU plus the cost-of-living adjustment (CPI) will be determined, and be brought before the City Council for approval prior to the start of the fiscal year. Additionally, improvements within the District will be reviewed to determine the extent of the improvements accepted for maintenance by the City. If it is determined that a portion of the improvements has either not been installed, or is installed but not accepted by the City for maintenance, a credit will be applied to Maximum Assessment rate per EDU. The credit will equal the portion of the annual maintenance costs associated with any improvements that have not been accepted for maintenance, and will be reflected in the final assessments placed on the County tax rolls for the fiscal year. This process will continue until such time that all improvements are complete and fully accepted by the City for maintenance.
As discussed previously, parcels in the District are the only parcels that derive special benefit from maintenance and operations and as such, must bear the cost of these activities. In accordance with the formation documents for the District, for each fiscal year the development status of parcels within the District will be reviewed to determine whether parcels are developed or vacant as described below. Each parcel within the District will then be assigned to one of the following four (4) categories based on that parcel’s development status:
D.1 Developed Accepted
This category includes parcels that have been developed and for which the City has accepted maintenance responsibilities. These parcels will be charged for their proportionate share of Total Direct Maintenance and Administration Expenses, based on each parcel’s share of the Maximum Assessment.
D.2 Developed Not Accepted
This category includes parcels that have been or are in the process of being developed and for which the City is not expecting to accept maintenance responsibilities in the upcoming fiscal year. These parcels will be charged for their proportionate share of the Administration Expenses and Storm Drain Maintenance Expenses, based on each parcel’s share of the Maximum Assessment. 122
16 SECTION VI
METHOD OF ASSESSMENT
City of Soledad June 19, 2024
FINAL Engineer’s Report for Orchard Villas/Miravale II MAD No. 1, Annexation No. 1 www.FinanceDTA.com
D.3 No Development
This category includes parcels that have not been developed and the City is not expecting to accept maintenance responsibilities for the upcoming fiscal year. These parcels will be charged for their proportionate share of the Total Administration Expenses based on each parcel’s share of the Maximum Assessment.
D.4 Pending Annexation
This category includes parcels that are within the boundaries of the District but have not been annexed into the City. These parcels will not be charged for any expenses.
Importantly, Article XlllD provides that publicly owned properties must be assessed unless there is clear and convincing evidence that those properties receive no special benefit from the assessment. As a result, the following property will be considered exempt from the assessment: areas of public streets, public avenues, public lanes, public roads, public drives, public courts, public alleys, public easements and right-of-way, public greenbelts and public parkways, and that portion of public property that is not developed and used for business purposes similar to private commercial, industrial, and institutional activities.
Each parcel in the District is assigned a weighting factor known as an Equivalent Dwelling Unit (“EDU”). The following shows the EDU factors for each property type in the District:
Developed, Single-Family Residential = 1.0 EDU per Parcel Developed, Multi-Family Residential = 1.0 EDU per Unit
Vacant Land, Future Residential = 0.3 EDU per Acre
E Amount of Assessment
Pursuant to the foregoing, Table 8 below shows the net amount to be assessed upon assessable lands within the District in Fiscal Year 2024-2025. Table 8: Fiscal Year 2024-2025 Assessment Rates in the District Assessment Per EDU
Fiscal Year 2023-2024
Assessment Per EDU
Fiscal Year 2024-2025
Max Assessment Per EDU
Fiscal Year 2024-2025
$649.76 $610.57 $1,360.87
123
17 SECTION VI
METHOD OF ASSESSMENT
City of Soledad June 19, 2024
FINAL Engineer’s Report for Orchard Villas/Miravale II MAD No. 1, Annexation No. 1 www.FinanceDTA.com
Table 9: Fiscal Year 2024-2025 Cost Estimate
124
18 SECTION VII
ASSESSMENT DIAGRAM AND
BOUNDARY MAP
City of Soledad June 19, 2024
FINAL Engineer’s Report for Orchard Villas/Miravale II MAD No. 1, Annexation No. 1 www.FinanceDTA.com
VII ASSESSMENT DIAGRAM AND BOUNDARY MAP
The boundary map for the District has been previously approved and submitted to the City in the format required by the 1972 Act and is on file in the Office of the City Clerk.
The parcels within the District generally consist of the lots, parcels, and subdivisions of land found within the following Assessment Diagram and are based on the Monterey County Assessor’s Maps and the Monterey County Assessor’s information that existed at the time this Report was prepared.
Figure 1: Assessment Diagram
125
19 SECTION VIII
TERMINATION OF
DISTRICT/LIMITATIONS OF
REPORT
City of Soledad June 19, 2024
FINAL Engineer’s Report for Orchard Villas/Miravale II MAD No. 1, Annexation No. 1 www.FinanceDTA.com
VIII TERMINATION OF DISTRICT/LIMITATIONS OF REPORT
A Termination of District
Assessments associated with the District will be levied each Fiscal Year until the District is dissolved by the City Council.
B Limitations of Report
The conclusions, calculations, and recommendations in this Report rely on the substantial data and information provided to DTA at the time of the writing of the Report by the following parties:
1. City of Soledad, specifically the Public Works Department;
2. The previous Assessment Engineer; and
3. The County of Monterey.
126
APPENDIX A
City of Soledad
Orchard Villas/Miravale II
Parks and Open Space Maintenance Assessment District No. 1 Annexation No. 1
Fiscal Year 2024-2025
ASSESSMENT ROLL
127
99 ALMADEN BLVD., SUITE 875
SAN JOSE, CA 95113
PHONE (800) 969-4DTA
Public Finance
Public-Private Partnerships
Development Economics
Clean Energy Bonds
www.FinanceDTA.com
128
DRAFT – FOR REVIEW
RESOLUTION NO. 6108
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SOLEDAD ORDERING
THE LEVY AND COLLECTION OF ASSESSMENTS WITHIN THE BENEFIT ASSESSMENT DISTRICT NO. 2 (ORCHARD VILLAS/MIRAVALE II) FOR FISCAL YEAR 2024/2025
The City Council of the City of Soledad, California (hereinafter referred to as the “City”) does resolve as follows:
WHEREAS, the City Council has by previous Resolutions initiated proceedings and declared its intention to levy assessments for the Benefit Assessment District No. 2, Orchard Villas/Miravale II (hereafter referred to as the “District”) for the fiscal year commencing July 1, 2024 and ending June 30, 2025 pursuant to the provisions of the Benefit Assessment Act of 1982, Chapter 6.4 of Part 1 of Division 2, Article 4 of the Government Code of California, beginning with Section 54703 (hereafter referred to as the "Act") to pay the costs and expenses of operating, maintaining, and servicing improvements and facilities located within public places within the boundaries of the District; and,
WHEREAS, DTA has prepared and filed with the City Clerk, and the City Clerk has presented to the Council, the Engineer’s Annual Levy Report (hereafter referred to as the “Report”) for the District that describes the District and the proposed levy and collection of assessments upon eligible parcels of land within the District, and the Council did by previous Resolution give preliminary approval of said Report; and,
WHEREAS, the City Council desires to levy and collect assessments against parcels of land within the District for the fiscal year commencing July 1, 2024 and ending June 30, 2025 to pay the costs and expenses of operating, maintaining, and servicing improvements and facilities located within the boundaries of the District; and,
WHEREAS, this City and DTA have reviewed the provisions of Section XIIID of the California State Constitution and found that the proposed assessments comply with these provisions.
NOW, THEREFORE, BE IT RESOLVED, DETERMINED, AND ORDERED BY
THE CITY COUNCIL OF THE CITY OF SOLEDAD FOR THE BENEFIT ASSESSMENT DISTRICT NO. 2 (ORCHARD VILLAS/MIRAVALE II) AS FOLLOWS:
Section 1 Following notice duly given, the City Council has held a full and fair Public Hearing regarding the District, the levy and collection of assessments, the Report prepared in connection therewith, and considered all oral and written statements, protests, and communications made or filed by interested persons regarding these matters.
Section 2 Based upon its review (and amendments, as applicable) of the Report, the City Council hereby finds and determines that:
i) the land within the District will receive special benefit by the operation, maintenance, and servicing of improvements and facilities located in public places within the boundaries of the District; and,
129
DRAFT – FOR REVIEW
ii) the District includes all of the lands so benefited; and, iii) the net amount to be assessed upon the lands within the District in accordance with the fee for the fiscal year commencing July 1, 2024 and ending June 30, 2025 is apportioned by a formula and method which fairly distributes the net amount among all eligible parcels in proportion to the estimated benefits to be received by each parcel from the improvements and services. This Fiscal Year assessment for the Benefit Assessment District No. 2 (Orchard Villas/Miravale II) is $281.16 per parcel.
Section 3 The Report and assessments as presented to the City Council and on file in the Office of the City Clerk are hereby confirmed as filed and approved by the City Council.
Section 4 The maintenance, operation, and servicing of the improvements and appurtenant facilities shall be performed pursuant to the Act. The City Council hereby orders the proposed improvements to be made, which improvements are briefly described as follows: the maintenance and operation including street sweeping, storm drain lines, Bryant Canyon Storm Drainage Channel as well as the onsite and offsite storm drain system, necessary cleaning, repairs, replacement, electric current, supervision, debris removal, engineering and inspection, and any and all other items of work necessary and incidental for the proper maintenance and operation thereof.
Assessments for the District are also being levied to provide funding for the maintenance, operation, and servicing storm retention pond silt removal, bank stabilization and restoring percolation, including necessary cleaning, repairs, replacement, electric current, supervision, debris removal, engineering and inspection, and any other items of work necessary and incidental for the proper maintenance and operation thereof. The Report describes all new improvements or substantial changes in existing improvements.
Section 5 The County Auditor of the County of Monterey shall enter on the County Assessment Roll opposite each eligible parcel of land the amount of levy so apportioned by the formula and method outlined in the Report, and such levies shall be collected at the same time and in the same manner as the County taxes are collected. After collection by the County, the net amount of the levy shall be paid to the City Treasurer.
Section 6 The City Finance Director shall deposit all money representing assessments collected by the County for the District to the credit of a fund known as the "Improvement Fund, City of Soledad, Benefit Assessment District No. 2 (Orchard Villas/Miravale II) and such monies shall be expended only for the maintenance, operation, and servicing improvements and facilities as described in Section 4.
Section 7 The adoption of this Resolution constitutes the District levy for the fiscal year commencing July 1, 2024 and ending June 30, 2025.
Section 8 The City Clerk or their designate is hereby authorized and directed to file the levy with the County Auditor upon adoption of this Resolution pursuant to Chapter 4, Article 1, Section 22641 of the Act.
130
DRAFT – FOR REVIEW
PASSED, APPROVED and ADOPTED this 19th day of June 2024 by the following vote:
AYES, and in favor thereof, Councilmembers:
NOES, Councilmembers:
ABSENT, Councilmembers:
ABSTAIN, Councilmembers:
___________________________________
ANNA M. VELAZQUEZ, Mayor
ATTEST:
____________________________________
MEGAN HUNTER, City Manager
131
Irvine | San Jose | San Francisco | Riverside
Dallas | Houston | Raleigh | Tampa
www.FinanceDTA.com
Public Finance
Public-Private Partnerships
Development Economics
Clean Energy Bonds
FINAL ENGINEER’S REPORT
ORCHARD VILLAS/MIRAVALE II
BENEFIT ASSESSMENT DISTRICT NO. 2
FUND #652
CITY OF SOLEDAD | COUNTY OF MONTEREY
Beginning Fiscal Year: 2024-2025
Intent Meeting: May 15, 2024
Public Hearing: June 19, 2024
Reso. 6108
132
www.FinanceDTA.com
99 Almaden Blvd., Suite 875
San Jose, CA 95113
CITY COUNCIL AND STAFF
MAYOR
Anna M. Velazquez
MAYOR PRO TEMPORE
Maria Corralejo
COUNCIL MEMBERS
Fernando Cabrera
Fernando Ansaldo-Sanchez
PUBLIC WORKS DIRECTOR
Donald Wilcox, P.E.
PROFESSIONAL SERVICES
ASSESSMENT ENGINEERING
Stephen A. Runk, P.E.
DTA
133
TABLE
OF CONTENTS
SECTION PAGE
I AFFIDAVIT AND CERTIFICATES............................1 II ENGINEER’S REPORT.............................................. 3 III PLANS AND SPECIFICATIONS.............................. 5 A Description of the District ............................................5 B District Improvements, Facilities, and
Services .............................................................................5 IV COST ESTIMATE...................................................... 7 A Costs of Improvements ................................................. 7 B Annual Cost Indexing ....................................................8 C Contributions from Other Sources...........................10 D Annual Installments ..................................................... 11 E Net Assessment............................................................. 11 V ASSESSMENT ROLL............................................... 12 VI METHOD OF ASSESSMENT ................................. 13 A Background....................................................................13 B Benefits of Improvements ..........................................14 C Categories of Benefit ...................................................14 D Allocation of Special Benefit to Parcels...................14 E Amount of Assessment................................................16
VII ASSESSMENT DIAGRAM AND
BOUNDARY MAP ................................................... 18
VIII TERMINATION OF
DISTRICT/LIMITATIONS OF REPORT ............... 19
A Termination of District................................................19 B Limitations of Report...................................................19
APPENDICES
APPENDIX A ASSESSMENT ROLL
134
1 SECTION I
AFFIDAVIT AND CERTIFICATES
City of Soledad June 19, 2024
FINAL Engineer’s Report for Orchard Villas/Miravale II BAD No. 2 www.FinanceDTA.com
I AFFIDAVIT AND CERTIFICATES
CITY OF SOLEDAD BENEFIT ASSESSMENT DISTRICT NO. 2
ORCHARD VILLAS/MIRAVALE II
This Engineer’s Report (“Report”) and the enclosed descriptions, budget, and assessment diagram outlines the District and includes the proposed assessments for each lot, parcel, and subdivision of land within said District to be levied for Fiscal Year 2024-2025 as they existed at the time of the passage of the Resolution of Intention.
Reference is hereby made to the Monterey County Assessor’s Maps for a detailed description of the lines and dimensions of parcels within the District. The undersigned respectfully submits the enclosed report as directed by the City Council.
Dated this ______ day of ______________, 2024.
DTA
Assessment Engineer
On Behalf of the City of Soledad
By: __________________________________________
Kuda Wekwete
Project Manager
By: __________________________________________
Stephen A. Runk, P.E.
License Number: C23473
135
2 SECTION I
AFFIDAVIT AND CERTIFICATES
City of Soledad June 19, 2024
FINAL Engineer’s Report for Orchard Villas/Miravale II BAD No. 2 www.FinanceDTA.com
CITY OF SOLEDAD BENEFIT ASSESSMENT DISTRICT NO. 2
ORCHARD VILLAS/MIRAVALE II
I HEREBY CERTIFY that the enclosed Engineer’s Report, together with the Assessment Diagram thereto attached, was filed with me on the ________ day of ____________, 2024. By: _____________________________ Megan Hunter, City Manager
City of Soledad, Monterey County
I HEREBY CERTIFY that the enclosed Engineer’s Report, together with the Assessment Diagram thereto attached, was approved and confirmed by the City Council of the City of Soledad, California, on the ______ day of _____________, 2024. By: _____________________________ Megan Hunter, City Manager
City of Soledad, Monterey County
136
3 SECTION II
ENGINEER’S REPORT
City of Soledad June 19, 2024
FINAL Engineer’s Report for Orchard Villas/Miravale II BAD No. 2 www.FinanceDTA.com
II ENGINEER’S REPORT
WHEREAS, the City Council of the City of Soledad (“City”), pursuant to the provisions of the Benefit Assessment Act of 1982, Chapter 64 of Division 2 of the California Government Code (“1982 Act”), adopted its resolution (“Resolution”) initiating proceedings for the levy of Fiscal Year 2024-2025 assessments against properties in the City of Soledad Benefit Assessment District No. 2 (the “District”) to fund maintenance and operation street and storm drain improvements that have been determined to specially benefit the District (“Improvements”).
WHEREAS, the Resolution designates DTA as Assessment Engineer and directed the Assessment Engineer to prepare and file a report (“Engineer’s Report” or “Report”) pursuant to the 1982 Act and Article XIIID of the California Constitution (“Proposition 218”).
This Report includes the following sections:
Plans and Specifications – Plans and specifications for services to be provided. Plans and specifications are a part of this Report whether or not separately bound.
Cost Estimate – An estimate of the annual cost of services to be provided. Also included, are administrative and incidental costs that include maintenance, reserve, repairs, and rehabilitation expenses.
Assessment Roll – An assessment roll, showing the amount to be assessed against each parcel of real property within this District and the names and addresses of the property owners. An Assessor’s Parcel number or other designation describes each parcel. Each parcel is also assigned an “assessment number” that links the Assessment Roll to the Assessment Diagram.
Method of Assessment – A statement of the method by which the Assessment Engineer determined the amount to be assessed against each parcel, based on special benefits to be derived by each parcel from the services.
Assessment Diagram – A diagram showing all of the parcels of real property to be assessed within this District. The diagram corresponds with the Assessment Roll by assessment number.
Termination of District/Limitations of Report – A statement as to the duration of the District and the accuracy of the data and information necessary for the development of this annual Report.
NOW THEREFORE, the undersigned, acting as an agent for DTA, Assessment Engineer for the District, by virtue of the power vested under the 1982 Act and the order of the City, hereby submits this Engineer’s Report and makes the following assessment to cover the portion of the estimated costs of the Improvements, including the incidental costs and expenses, to be paid by the District.
The net assessment in Fiscal Year 2024-2025 is summarized in Table 1. 137
4 SECTION II
ENGINEER’S REPORT
City of Soledad June 19, 2024
FINAL Engineer’s Report for Orchard Villas/Miravale II BAD No. 2 www.FinanceDTA.com
Table 1: Net Assessment for Fiscal Year 2024-2025
Item Amount
Maintenance Costs $26,040
Capital Improvement Costs $243,369
Administration Costs $37,823
Levy Adjustments (Reserve Fund Debit) ($151,133)
Net Assessment* $156,099
*Note: Figures may not sum due to rounding. DTA does hereby assess the net amount to be assessed upon all assessable lots or parcels of land within the District by apportioning the amount allocable among the several lots or parcels of each in proportion to the estimated special benefits to be received by each such lot or parcel from the Improvements, as more particularly set forth in the list attached as Appendix A (“Assessment Roll”) and by this reference made as part of this Engineer’s Report.
The District diagram appearing herein is a representation of the assessment diagram that was approved by resolution of the City Council. Reference is hereby made to the Assessor’s Maps of the County of Monterey for Fiscal Year 2024-2025 for a more particular description of the properties within the District. Each parcel of land assessed is described on the Assessment Roll by reference to its parcel number as shown on the County of Monterey Assessment Roll.
DTA
Kuda Wekwete Date
Managing Director
Stephen A. Runk, P.E. Date
License Number: C23473
138
5 SECTION III
PLANS AND SPECIFICATIONS
City of Soledad June 19, 2024
FINAL Engineer’s Report for Orchard Villas/Miravale II BAD No. 2 www.FinanceDTA.com
III PLANS AND SPECIFICATIONS
The plans, specifications, and studies of the Improvements for this District are voluminous and will not be bound in this Report, but by this reference are incorporated as if attached to this Report. The plans and specifications are on file with the City of Soledad and/or the County of Monterey, California.
A Description of the District
The District is generally located between Orchard Lane and Granada Street, south of Gabilan Drive, west of Bryant Canyon Road, and east of Orchard Lane. A District diagram incorporated herein under Section VII of this Report outlines the boundaries of the District.
This diagram incorporates all lots, parcels, and subdivisions of land within the District as the same existed at the time this Report was prepared, a complete listing of which is provided in Appendix A of this Report.
B District Improvements, Facilities, and Services
The following descriptions, provided in the formation documents of the District, identify the types of improvements that will be maintained by the District. Detailed maps and descriptions of these improvements are on file with the City and are available for inspection in the office of the City Engineer and have been incorporated into this Report by reference.
B.1 Street and Storm Drain Improvements
The maintenance and operation of the improvements located on the streets within the District includes the following: street sweeping, storm drain lines, including necessary cleaning, repairs, replacement, electric current, supervision, debris removal, engineering and inspection, and any and all other items of work necessary and incidental for the proper maintenance and operation thereof. Additionally, maintenance and operation includes all additions, improvements, and enlargements which may be made on the previously described work within the following streets and on appurtenant improvement plans.
The improvements that are covered under the maintenance and operations of the District are located on the following streets:
Serra Court, Rusconi Court, Villas Street, Camino Arroyo, Luchessa Way, Orchard Lane, Tomasini Trail, Davalos Land, Tankersley Street, Luna Drive, Calle Val Verde, Liberty Court, and Liberty Way located in Orchard Villas; and Santa Clara, Binsacca, San Rafael, Westcott, San Gabriel, Pura, La Colina Street, Jones, San Antonio Bryant Canyon Road, Gabilan Drive, Rojos Way, Rusconi Court, Asilomar Street, Rusconi Court, Orchard Lane, and currently un-named streets located in Miravale II.
139
6 SECTION III
PLANS AND SPECIFICATIONS
City of Soledad June 19, 2024
FINAL Engineer’s Report for Orchard Villas/Miravale II BAD No. 2 www.FinanceDTA.com
Additionally, District maintenance and operations include the Bryant Canyon Storm Drainage Channel as well as the onsite and offsite storm drain system.
B.2 Storm Water Improvements
Maintenance and operation includes storm retention pond, necessary cleaning, repairs, replacement, electric current, supervision, debris removal, pest abatement, engineering and inspection, and any and all other items of work necessary and incidental for the proper maintenance and operation thereof. Additionally, maintenance and operation includes all additions, improvements, and enlargements which may be made on the previously described work within the following area and on appurtenant improvement plans.
The improvements that are covered under the maintenance and operations of the District are located in Miravale II, and include an 8-acre underground storm water retention facility, shown on the approved improvement plans for the Miravale II subdivision and any subsequent revisions.
B.3 Incidental and Other Expenses
Incidental costs include contingencies and District incidentals such as engineering, printing, notices to property owners, collection costs, legal fees, administration, and supervision.
140
7 SECTION IV
COST ESTIMATE
City of Soledad June 19, 2024
FINAL Engineer’s Report for Orchard Villas/Miravale II BAD No. 2 www.FinanceDTA.com
IV COST ESTIMATE
Applicable law requires the Engineer’s Report to contain an estimate of the costs of the Improvements for Fiscal Year 2024-2025, including estimates of (i) the total costs for Improvements for Fiscal Year 2024-2025, including incidental expenses, (ii) the amount of any surplus in the improvement fund to be carried over from a previous Fiscal Year, (iii) the amount of any contributions to be made from sources other than assessments levied pursuant to this part, (iv) the amount, if any, of the annual installment for the Fiscal Year where the legislative body has ordered an assessment for the estimated cost of any improvements to be levied and collected in annual installments, and (v) the net amount to be assessed upon assessable lands within the District. Estimates of these amounts are provided below.
The following describes the costs that are funded through the District.
A Costs of Improvements
A.1 Projected Annual Maintenance Costs & Capital Improvement Costs Included in the City’s Public Works Department Budget Request are estimated costs for the annual maintenance, servicing, and funding of all improvements within the District. District direct maintenance expenses are estimated at $26,040 for Fiscal Year 2024-2025 as shown in Table 2a below. District’s direct capital improvement costs are estimated at $243,369 for Fiscal Year 2024-2025 as shown in Table 2b below.
Table 2a: Projected Annual Direct Maintenance Costs
Item Description Cost Estimate
Detention Basin Maintenance $3,761
Storm Drain Maintenance $4,298
Bryant Canyon Channel $5,576
Street Sweeping $11,007
Engineering Inspection $1,398
Total* $26,040
*Note: Figures may not sum due to rounding.
Table 2b: Projected Capital Improvement Costs
Item Description Cost Estimate
Crack Seal / Slurry Seal Project* $243,369
Total* $243,369
*Funded by the available funds in the capital reserve account. 141
8 SECTION IV
COST ESTIMATE
City of Soledad June 19, 2024
FINAL Engineer’s Report for Orchard Villas/Miravale II BAD No. 2 www.FinanceDTA.com
A.2 Projected Annual Administration Costs
In addition to the costs listed above, there will be costs attributed to the administration of the District. As shown in Table 3, the District administration costs are estimated to be $37,823 for Fiscal Year 2024-2025. These costs are summarized below.
Table 4: Projected Annual Administration Costs
Item Description Cost Estimate
City Administration $28,237
District Administration $5,282
Printing and Advertising $643
County Collection $3,662
Total* $37,823
*Note: Figures may not sum due to rounding.
A.3 Projected Annual Levy Adjustment
Finally, in addition to the costs listed above, certain levy adjustments will be made to account for any operating reserve credits or required capital collection to the District’s reserve fund. As shown in Table 4, an Operating Reserve Credit of $31,245 and Capital Reserve Credit of $243,369 have been applied to offset the required Capital Reserve Collection of $123,481. Therefore, a net total of $151,133 Reserve Fund Credit has been applied to the Fiscal Year 2024-2025 assessment.
Table 5: Projected Annual Levy Adjustment
Item Description Cost Estimate
Capital Reserve Collection $123,481
Operating Reserve Credit ($31,245)
Capital Reserve Credit ($243,369)
Total ($151,133) *Note: Figures may not sum due to rounding. B Annual Cost Indexing B.1 City/District Administration, Printing, and Advertising With the passage of Proposition 218, any proposed increase in assessments must be approved by impacted property owners via a mail ballot and public hearing process, similar to these proceedings. A weighted simple majority of ballots received (weighted according to each parcel’s proportionate assessment obligation) must be affirmative for the City Council to confirm and levy the increased assessments. For small assessment districts or districts with relatively low dollar assessments, the cost of an Engineer’s Report, balloting, and the public hearing process can potentially 142
9 SECTION IV
COST ESTIMATE
City of Soledad June 19, 2024
FINAL Engineer’s Report for Orchard Villas/Miravale II BAD No. 2 www.FinanceDTA.com
exceed the total amount of the increase. The incidental costs of these proceedings may be added to the assessments, resulting in even higher assessments. 143
10 SECTION IV
COST ESTIMATE
City of Soledad June 19, 2024
FINAL Engineer’s Report for Orchard Villas/Miravale II BAD No. 2 www.FinanceDTA.com
Therefore, indexing assessments annually to the published “San Francisco Consumer Price Index for Urban Consumers” (“SF CPI”) allows for minor increases in normal maintenance and operating costs, without incurring the costs of ballot proceedings required by Proposition 218. Any other significant changes to the District (e.g., increases in service, modification of the boundary, etc.) would still require Proposition 218 proceedings and, ultimately, property owner approval.
Thus, on each July 1, commencing on July 1, 2007, the maximum authorized unit assessment rates established in these proceedings will be indexed (increased) annually by a factor equal to the published SF CPI from the preceding Fiscal Year.
The most recent data for the increase in the SF CPI is the increase between February 2023 and February 2024 and shows an increase equal to 2.37%. Therefore, on July 1, 2024, the maximum assessment will thus be increased by 2.37%. Since the maximum assessment is likely sufficient to cover the cost estimates for improvements and other expenses for Fiscal Year 2024-2025, an amount equal to only the total projected costs will be assessed on the property within the District.
The assessment levy in future years may be any amount less than or equal to the maximum assessment in that year.
B.2 Collection Fees
The County Auditor/Controller also charges an additional 0.25% of the total amount assessed.
B.3 Reserve Collection/Transfer
The applicable law provides for a District Reserve Fund that provides for the collection of funds to cover District operations between July 1 (beginning of the Fiscal Year) and the date on which the County remits first installment of assessments collected from the property tax bills (typically January or February). Any negative amounts entries for this budget item represent transfers from the Reserve Fund to reduce the assessment in a given fiscal year. A fully funded Reserve enables the District to (i) cover operational expenses incurred in the six (6) months of the fiscal year, without any City funds from non-District accounts; and (ii) address any unforeseen or unusual expenditures that may occur during the year.
C Contributions from Other Sources
Proposition 218 provides that “an agency shall separate the general benefits from the special benefits conferred…” In accordance with that provision, it is determined that there will be no general benefit from the Improvements in Fiscal Year 2024-2025, as explained in Section VI of this Report.
144
11 SECTION IV
COST ESTIMATE
City of Soledad June 19, 2024
FINAL Engineer’s Report for Orchard Villas/Miravale II BAD No. 2 www.FinanceDTA.com
D Annual Installments
The entire amount of the net assessment, as shown in Table 5 below, will be assessed in Fiscal Year 2024-2025. E Net Assessment
Pursuant to the foregoing, Table 5 shows the net amount to be assessed upon assessable lands within the District in Fiscal Year 2024-2025. Table 6: Net Assessment for Fiscal Year 2024-2025 Item Total Costs
Special
Benefit
Allocated
Net
Assessment
Maintenance Costs (Direct)
Detention Basin Maintenance $3,761 100% $3,761
Storm Drain Maintenance $4,298 100% $4,298
Bryant Canyon Channel $5,576 100% $5,576
Street Sweeping $11,007 100% $11,007
Engineering Inspection $1,398 100% $1,398
Capital Improvement Costs (Direct)
Crack Seal / Slurry Seal Project** $243,369 100% $243,369 Administration Costs
City Administration $28,237 100% $28,237
District Administration $5,282 100% $5,282
Printing and Advertising $643 100% $643
County Collection $3,662 100% $3,662
Levy Adjustments
Capital Reserve Collection $123,481 100% $123,481
Operating Reserve Credit ($31,245) 100% ($31,245)
Capital Reserve Credit ($243,369) 100% ($243,369)
Net Assessment* $156,099 N/A $156,099
*Note: Figures may not sum due to rounding. **Funded by the available funds in the capital reserve account. 145
12 SECTION V
ASSESSMENT ROLL
City of Soledad June 19, 2024
FINAL Engineer’s Report for Orchard Villas/Miravale II BAD No. 2 www.FinanceDTA.com
V ASSESSMENT ROLL
The Assessment Engineer has prepared an Assessment Roll for the District as required by applicable law, based upon the assessment methodology described in this Engineer’s Report. The Assessment Roll includes the net total assessment for Fiscal Year 2024-2025 and shows the Fiscal Year 2024-2025 assessment, assessment number, Assessor’s Parcel Number, and land use designation for each parcel.
The Assessment Roll, as provided in Appendix A, lists the Assessor’s Parcel Numbers within this Assessment District by assessment number. The assessment numbers appearing on the Assessment and the names and addresses of the property owners are as shown on the last equalized assessment roll for taxes or as known to the Assessor of Monterey County.
All parcel information has been provided to DTA by the City Public Works Department, the previous Assessment Engineer, and the County of Monterey. 146
13 SECTION VI
METHOD OF ASSESSMENT
City of Soledad June 19, 2024
FINAL Engineer’s Report for Orchard Villas/Miravale II BAD No. 2 www.FinanceDTA.com
VI METHOD OF ASSESSMENT
A Background
Pursuant to the 1982 Act, the legislative body establishes and determines the “estimated benefit received” by each parcel from the Improvements.
In addition, Article XIIID of the California Constitution, added in November 1996 through the passage of Proposition 218 by voters of the State of California, requires, inter alia, that (i) only special benefits be assessable, (ii) no assessment may exceed the proportional special benefit conferred on the parcel assessed, and (iii) publicly owned parcels shall not be exempt from assessment unless clear and convincing evidence demonstrates that such publicly owned parcels receive no special benefits from the improvements for which the assessment is levied.
“Special benefit” is a particular and distinct benefit over and above general benefits conferred on real property located in the District or to the public at large. Importantly, the general enhancement of property value does not constitute special benefit. As such, this Engineer’s Report has been designed to comply with these requirements, as well as to incorporate recent California court decisions such as: Silicon Valley Taxpayers Association, Inc. v. Santa Clara County Open Space Authority (2008), Beutz v. County of Riverside (2010), Golden Hills Neighborhood Association v. City of San Diego (2011), and Concerned Citizens v. West Point Fire Protection District (2011). Methodologically, it is necessary and essential to identify the special benefit that the improvements, facilities, and services will render to the properties within the District. It is also necessary that the properties receive a special and direct benefit as distinguished from benefit to the general public.
The Assessment Engineer is appointed for the purpose of analyzing the facts and determining the method and formula for apportionment of the assessment obligation to the benefited properties. For these proceedings, the City has retained the firm of DTA as the Assessment Engineer.
The Assessment Engineer makes his or her recommendation for the method of apportionment in this Engineer’s Report for consideration at the public hearing. However, the final authority and action rests with the City Council after hearing all testimony and evidence presented at the public hearing. Upon conclusion of the public hearing, the City Council must make the final action in determining that the assessment has been made in direct proportion to the special benefit received.
In determining the net amount to be assessed upon parcels within the District, Section 22573 of the California Streets and Highways Code states that such amount “may be apportioned by any formula or method which fairly distributes the net amount among all assessable lots or parcels in proportion to the estimated benefits to be received by each such lot or parcel from the improvements.”
147
14 SECTION VI
METHOD OF ASSESSMENT
City of Soledad June 19, 2024
FINAL Engineer’s Report for Orchard Villas/Miravale II BAD No. 2 www.FinanceDTA.com
Proposition 218 further states that “no assessment shall be imposed on any parcel which exceeds the reasonable cost of the proportional special benefit conferred on that parcel,” where “special benefit” means “a particular and distinct benefit over and above general benefits conferred on real property located in the District or to the public at large.” This Section VI describes the methodology used to calculate the net amount to be assessed on each parcel within the District in proportion to the special benefit conferred on each such parcel.
B Benefits of Improvements
The benefits associated with District Improvements are shown in the Table 6 below.
Table 7: Benefits from Street/Storm Drain Improvements
Street/Storm Drain Improvements
Alleviation of excess water during periods of rain.
Safe and efficient movement of people and goods within motor vehicles.
Development of parcels in the District contingent on completion of Improvements.
C Categories of Benefit
Proposition 218 provides that “an agency shall separate the general benefits from the special benefits conferred on a parcel,” where “Special Benefit means a particular and distinct benefit over and above general benefits conferred on real property located in the district or to the public at large.” It is therefore necessary to establish definitions of General Benefit and Special Benefit as such terms relate to the benefit to be derived from the Improvements.
The Improvements to be maintained and operated in the District were within or in areas in close proximity to properties in the District. As a result, properties in the District will receive 100% of the special benefits of the operation and maintenance of the Improvements. These benefits include enhanced neighborhood health and safety, improved quality of life from drainage, flood control and street improvements, protection of improved property, enhanced comfort, and increased desirability of the immediate surroundings of the residential units within the District. Importantly, because of the location of the improvements within or close to the District itself, there is no general benefit to properties outside the District or the community as a whole. Any such general benefit is so incidental and negligible (less than 1%) that it cannot be calculated for purposes of assessment.
D Allocation of Special Benefit to Parcels
Each fiscal year, the Maximum Assessment Rate per EDU plus the cost-of-living adjustment (CPI) will be determined, and be brought before the City Council for approval prior to the start of the fiscal year. Additionally, improvements within the District will be reviewed to determine the extent of the improvements accepted for maintenance by the City. If it is determined that a portion of the improvements has either not been installed, or is installed but not accepted by the City for maintenance, a credit will be applied to Maximum Assessment rate per EDU. The credit will equal the portion of the annual maintenance costs 148
15 SECTION VI
METHOD OF ASSESSMENT
City of Soledad June 19, 2024
FINAL Engineer’s Report for Orchard Villas/Miravale II BAD No. 2 www.FinanceDTA.com
associated with any improvements that have not been accepted for maintenance, and will be reflected in the final assessments placed on the County tax rolls for the fiscal year. This process will continue until such time that all improvements are complete and fully accepted by the City for maintenance.
As discussed previously, parcels in the District are the only parcels that derive special benefit from maintenance and operations and as such, must bear the cost of these activities. In accordance with the formation documents for the District, for each fiscal year the development status of parcels within the District will be reviewed to determine whether parcels are developed or vacant as described below. Each parcel within the District will then be assigned to one of the following four (4) categories based on that parcel’s development status:
D.1 Developed Accepted
This category includes parcels that have been developed and for which the City has accepted maintenance responsibilities. These parcels will be charged for their proportionate share of Total Direct Maintenance and Administration Expenses, based on each parcel’s share of the Maximum Assessment.
D.2 Developed Not Accepted
This category includes parcels that have been or are in the process of being developed and for which the City is not expecting to accept maintenance responsibilities in the upcoming fiscal year. These parcels will be charged for their proportionate share of the Administration Expenses and Storm Drain Maintenance Expenses, based on each parcel’s share of the Maximum Assessment.
D.3 No Development
This category includes parcels that have not been developed and the City is not expecting to accept maintenance responsibilities for the upcoming fiscal year. These parcels will be charged for their proportionate share of the Total Administration Expenses based on each parcel’s share of the Maximum Assessment.
D.4 Pending Annexation
This category includes parcels that are within the boundaries of the District but have not been annexed into the City. These parcels will not be charged for any expenses.
Importantly, Article XlllD provides that publicly owned properties must be assessed unless there is clear and convincing evidence that those properties receive no special benefit from the assessment. As a result, the following property will be considered exempt from the assessment: areas of public streets, public avenues, public lanes, public roads, public drives, public courts, public alleys, public easements and right-of-way, public greenbelts and public parkways, and that portion of public property that is not developed and used for business purposes similar to private commercial, industrial, and institutional activities. 149
16 SECTION VI
METHOD OF ASSESSMENT
City of Soledad June 19, 2024
FINAL Engineer’s Report for Orchard Villas/Miravale II BAD No. 2 www.FinanceDTA.com
Each parcel in the District is assigned a weighting factor known as an Equivalent Dwelling Unit (“EDU”). The following shows the EDU factors for each property type in the District:
Developed, Single-Family Residential = 1.0 EDU per Parcel Developed, Multi-Family Residential = 1.0 EDU per Unit
Vacant Land, Future Residential = 0.3 EDU per Acre
E Amount of Assessment
Pursuant to the foregoing, Table 7 below shows the net amount to be assessed upon assessable lands within the District in Fiscal Year 2024-2025. Table 8: Fiscal Year 2024-2025 Assessment Rates in the District Assessment Per EDU
Fiscal Year 2023-2024
Assessment Per EDU
Fiscal Year 2024-2025
Max Assessment Per EDU
Fiscal Year 2024-2025
$274.66 $281.16 $281.16
150
17 SECTION VI
METHOD OF ASSESSMENT
City of Soledad June 19, 2024
FINAL Engineer’s Report for Orchard Villas/Miravale II BAD No. 2 www.FinanceDTA.com
Table 9: Fiscal Year 2024-2025 Cost Estimate
Description Total Amount ($)
Special Benefit
Apportioned to
District
Fiscal Year 2024-2025
Total Budget
(Amount Funded to District)
(A) Direct Cost
Operating Expenses
Detention Basin Maintenance $3,761.45 100% $3,761.45
Storm Drain Maintenance $4,297.71 100% $4,297.71
Bryant Canyon Channel $5,575.96 100% $5,575.96
Street Sweeping $11,006.60 100% $11,006.60
Engineering Inspection $1,397.85 100% $1,397.85
(B) Capital Improvement Cost
Crack Seal / Slurry Seal Project* $243,369.00 100% $243,369.00 (C) Administration
City Administration $28,236.75 100% $28,236.75
District Administration $5,281.84 100% $5,281.84
Printing and Advertising $642.99 100% $642.99
County Collection $3,661.74 100% $3,661.74
Subtotal (A+B) $307,231.90 NA $307,231.90
(D) Levy Adjustments
Capital Reserve Collection $123,480.84
Operating Reserve Credit ($31,244.96)
Capital Reserve Transfer Out ($243,369.00)
Balance to Levy (A+B+C) NA NA $156,098.78
(E) District Assessment
Total EDUs Count 555.20
Total Parcels Count 665
Total Parcels Levied 665
FY 2024-2025 Calculated Assessment per EBU $281.16
FY 2024-2025 Maximum Assessment per EBU $281.16
FY 2024-2025 Maximum Levy $156,098.78
(F) Fund Balance Information
Beginning Reserve Fund Balance FY (2024 -2025) $567,486.80 Reserve Fund Adjustments ($151,133.12)
Anticipated Ending Balance in Reserve Fund FY (2024-2025) $416,353.68 *Funded by the available funds in the capital reserve account.
City of Soledad
Engineer's Report
Benefit Assessment District No.2, Orchard Villas/Miravale II - Fund #652 Fiscal Year 2024-2025 Cost Estimate
151
18 SECTION VII
ASSESSMENT DIAGRAM AND
BOUNDARY MAP
City of Soledad June 19, 2024
FINAL Engineer’s Report for Orchard Villas/Miravale II BAD No. 2 www.FinanceDTA.com
VII ASSESSMENT DIAGRAM AND BOUNDARY MAP
The boundary map for the District has been previously approved and submitted to the City in the format required by the 1972 Act and is on file in the Office of the City Clerk.
The parcels within the District generally consist of the lots, parcels, and subdivisions of land found within the following District Diagram and are based on the Monterey County Assessor’s Maps and the Monterey County Assessor’s information that existed at the time this Report was prepared.
Figure 1: District Diagram
152
19 SECTION VIII
TERMINATION OF
DISTRICT/LIMITATIONS OF
REPORT
City of Soledad June 19, 2024
FINAL Engineer’s Report for Orchard Villas/Miravale II BAD No. 2 www.FinanceDTA.com
VIII TERMINATION OF DISTRICT/LIMITATIONS OF REPORT
A Termination of District
Assessments associated with the District will be levied each Fiscal Year until the District is dissolved by the City Council.
B Limitations of Report
The conclusions, calculations, and recommendations in this Report rely on the substantial data and information provided to DTA at the time of the writing of the Report by the following parties:
1. City of Soledad, specifically the Public Works Department;
2. The previous Assessment Engineer; and
3. The County of Monterey.
153
APPENDIX A
City of Soledad
Orchard Villas/Miravale II
Benefit Assessment District No. 2
Fiscal Year 2024-2025
ASSESSMENT ROLL
154
99 ALMADEN BLVD., SUITE 875
SAN JOSE, CA 95113
PHONE: (800) 969-4DTA
Public Finance
Public-Private Partnerships
Development Economics
Clean Energy Bonds
www.FinanceDTA.com
155
DRAFT – FOR REVIEW
RESOLUTION NO. 6109
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SOLEDAD ORDERING
THE LEVY AND COLLECTION OF ASSESSMENTS WITHIN THE RANCHO SAN
VICENTE PARKS AND OPEN SPACES MAINTENANCE ASSESSMENT DISTRICT FOR FISCAL YEAR 2024/2025
The City Council of the City of Soledad (hereinafter referred to as the “City”) does resolve as follows:
WHEREAS, the City Council has by previous Resolutions initiated proceedings and declared its intention to levy assessments for the Rancho San Vicente Parks and Open Spaces Maintenance Assessment District (hereafter referred to as the “District”) for the fiscal year commencing July 1, 2024 and ending June 30, 2025 pursuant to the provisions of the Landscaping and Lighting Act of 1972, Part 2 of Division 15 of the California Streets and Highways Code, commencing with Section 22500 (hereafter referred to as the "Act") to pay the costs and expenses of operating, maintaining, and servicing improvements and facilities located within public places within the boundaries of the District; and,
WHEREAS, DTA has prepared and filed with the City Clerk, and the City Clerk has presented to the Council, the Engineer’s Annual Levy Report (hereafter referred to as the “Report”) for the District that describes the District and the proposed levy and collection of assessments upon eligible parcels of land within the District, and the Council did by previous Resolution give preliminary approval of said Report; and,
WHEREAS, the City Council desires to levy and collect assessments against parcels of land within the District for the fiscal year commencing July 1, 2024 and ending June 30, 2025 to pay the costs and expenses of operating, maintaining, and servicing improvements and facilities located within the boundaries of the District; and,
WHEREAS, this City and DTA have reviewed the provisions of Section XIIID of the California State Constitution and found that the proposed assessments comply with these provisions.
NOW, THEREFORE, BE IT RESOLVED, DETERMINED, AND ORDERED BY
THE CITY COUNCIL OF THE CITY OF SOLEDAD FOR THE RANCHO SAN
VICENTE PARKS AND OPEN SPACES MAINTENANCE ASSESSMENT DISTRICT AS FOLLOWS:
Section 1 Following notice duly given, the City Council has held a full and fair Public Hearing regarding the District, the levy and collection of assessments, the Report prepared in connection therewith, and considered all oral and written statements, protests, and communications made or filed by interested persons regarding these matters.
Section 2 Based upon its review (and amendments, as applicable) of the Report, the City Council hereby finds and determines that:
i) the land within the District will receive special benefit by the operation, maintenance, and servicing of improvements located in public places within the boundaries of the District; and,
156
DRAFT – FOR REVIEW
ii) the District includes all of the lands so benefited; and, iii) the net amount to be assessed upon the lands within the District in accordance with the fee for the fiscal year commencing July 1, 2024 and ending June 30, 2025 is apportioned by a formula and method which fairly distributes the net amount among all eligible parcels in proportion to the estimated benefits to be received by each parcel from the improvements and services. This Fiscal Year assessment for the Rancho San Vicente Parks and Open Spaces Maintenance Assessment District is $819.66 per parcel.
Section 3 The Report and assessments as presented to the City Council and on file in the Office of the City Clerk are hereby confirmed as filed and approved by the City Council.
Section 4 The maintenance, operation, and servicing of the improvements and appurtenant facilities shall be performed pursuant to the Act. The City Council hereby orders the proposed improvements to be made, which improvements are briefly described as follows: the maintenance and operation of and the furnishing of services and materials for landscape maintenance easement areas including open space areas, parkways, and slopes within the boundaries of the District, including, but not limited to trees, shrubs, turf and other ornamental vegetation, drainage and irrigation systems, stitch piers; park maintenance and repairs, and sound wall maintenance repairs; and other appurtenant facilities. The Report describes all new improvements or substantial changes in existing improvements.
Section 5 The County Auditor of the County of Monterey shall enter on the County Assessment Roll opposite each eligible parcel of land the amount of levy so apportioned by the formula and method outlined in the Report, and such levies shall be collected at the same time and in the same manner as the County taxes are collected pursuant to Chapter 4, Article 2, Section 22646 of the Act. After collection by the County, the net amount of the levy shall be paid to the City Treasurer.
Section 6 The City Finance Director shall deposit all money representing assessments collected by the County for the District to the credit of a fund known as the "Improvement Fund, City of Soledad, Rancho San Vicente Parks and Open Spaces Maintenance Assessment District and such monies shall be expended only for the maintenance, operation, and servicing improvements and facilities as described in Section 4.
Section 7 The adoption of this Resolution constitutes the District levy for the fiscal year commencing July 1, 2024 and ending June 30, 2025.
Section 8 The City Clerk or their designate is hereby authorized and directed to file the levy with the County Auditor upon adoption of this Resolution pursuant to Chapter 4, Article 1, Section 22641 of the Act.
157
DRAFT – FOR REVIEW
PASSED, APPROVED and ADOPTED this 19th day of June 2024 by the following vote:
AYES, and in favor thereof, Councilmembers:
NOES, Councilmembers:
ABSENT, Councilmembers:
ABSTAIN, Councilmembers:
______________________________
ANNA M. VELAZQUEZ, Mayor
ATTEST:
____________________________________
MEGAN HUNTER, City Manager
158
Irvine | San Jose | San Francisco | Riverside
Dallas | Houston | Raleigh | Tampa
www.FinanceDTA.com
Public Finance
Public-Private Partnerships
Development Economics
Clean Energy Bonds
FINAL ENGINEER’S REPORT
RANCHO SAN VICENTE PARKS AND OPEN
SPACES
MAINTENANCE ASSESSMENT DISTRICT
FUND #647
CITY OF SOLEDAD | COUNTY OF MONTEREY
Beginning Fiscal Year: 2024-2025
Intent Meeting: May 15, 2024
Public Hearing: June 19, 2024
Reso. 6109
159
www.FinanceDTA.com
99 Almaden Blvd., Suite 875
San Jose, CA 95113
CITY COUNCIL AND STAFF
MAYOR
Anna M. Velazquez
MAYOR PRO TEMPORE
Maria Corralejo
COUNCIL MEMBERS
Fernando Cabrera
Fernando Ansaldo-Sanchez
PUBLIC WORKS DIRECTOR
Donald Wilcox, P.E.
PROFESSIONAL SERVICES
ASSESSMENT ENGINEERING
Stephen A. Runk, P.E.
DTA
160
TABLE
OF CONTENTS
SECTION PAGE
I AFFIDAVIT AND CERTIFICATES............................1 II ENGINEER’S REPORT.............................................. 3 III PLANS AND SPECIFICATIONS.............................. 5 A Description of the District ............................................5 B District Improvements, Facilities, and
Services............................................................................5 IV COST ESTIMATE...................................................... 7 A Costs of Improvements ................................................. 7 B Annual Cost Indexing ....................................................8 C Contributions from Other Sources.............................9 D Annual Installments .......................................................9 E Net Assessment.............................................................10 V ASSESSMENT ROLL................................................11 VI METHOD OF ASSESSMENT ................................. 12 A Background....................................................................12 B Benefits of Improvements ..........................................13 C Categories of Benefit ...................................................14 D Allocation of Special Benefit to Parcels...................14 E Amount of Assessment................................................15
VII ASSESSMENT DIAGRAM AND
BOUNDARY MAP ................................................... 17
VIII TERMINATION OF
DISTRICT/LIMITATIONS OF REPORT ............... 19
A Termination of District................................................19 B Limitations of Report...................................................19
APPENDICES
APPENDIX A ASSESSMENT ROLL
161
1 SECTION I
AFFIDAVIT AND CERTIFICATES
City of Soledad June 19, 2024
FINAL Engineer’s Report for Rancho San Vicente MAD No. 1 www.FinanceDTA.com
I AFFIDAVIT AND CERTIFICATES
CITY OF SOLEDAD RANCHO SAN VICENTE PARKS AND OPEN SPACES
MAINTENANCE ASSESSMENT DISTRICT
This Engineer’s Report (“Report”) and the enclosed descriptions, budget, and assessment diagram outlines the District and includes the proposed assessments for each lot, parcel, and subdivision of land within said District to be levied for Fiscal Year 2024-2025 as they existed at the time of the passage of the Resolution of Intention.
Reference is hereby made to the Monterey County Assessor’s Maps for a detailed description of the lines and dimensions of parcels within the District. The undersigned respectfully submits the enclosed report as directed by the City Council.
Dated this ______ day of ______________, 2024.
DTA
Assessment Engineer
On Behalf of the City of Soledad
By: __________________________________________
Kuda Wekwete
Project Manager
By: __________________________________________
Stephen A. Runk, P.E.
License Number: C23473
162
2 SECTION I
AFFIDAVIT AND CERTIFICATES
City of Soledad June 19, 2024
FINAL Engineer’s Report for Rancho San Vicente MAD No. 1 www.FinanceDTA.com
CITY OF SOLEDAD RANCHO SAN VICENTE PARKS AND OPEN SPACES
MAINTENANCE ASSESSMENT DISTRICT
I HEREBY CERTIFY that the enclosed Engineer’s Report, together with the Assessment Diagram thereto attached, was filed with me on the ________ day of ____________, 2024. By: _____________________________ Megan Hunter, City Manager
City of Soledad, Monterey County
I HEREBY CERTIFY that the enclosed Engineer’s Report, together with the Assessment Diagram thereto attached, was approved and confirmed by the City Council of the City of Soledad, California, on the ______ day of _____________, 2024. By: _____________________________ Megan Hunter, City Manager
City of Soledad, Monterey County
163
3 SECTION II
ENGINEER’S REPORT
City of Soledad June 19, 2024
FINAL Engineer’s Report for Rancho San Vicente MAD No. 1 www.FinanceDTA.com
II ENGINEER’S REPORT
WHEREAS, the City Council of the City of Soledad (“City”), pursuant to the provisions of the Landscaping and Lighting Act of 1972, Part 2 of Division 15 of the California Streets and Highways Code (the “1972 Act”), adopted its resolution (“Resolution”) initiating proceedings for the levy of Fiscal Year 2024-2025 assessments against properties in the Rancho San Vicente Parks and Open Spaces Maintenance Assessment District (the “District”) to fund maintenance and operation of park, landscape, and street light improvements that have been determined to specially benefit the District (“Improvements”).
WHEREAS, the Resolution designates DTA as Assessment Engineer and directed the Assessment Engineer to prepare and file a report (“Engineer’s Report” or “Report”) pursuant to the 1972 Act and Article XIIID of the California Constitution (“Proposition 218”).
This Report includes the following sections:
Plans and Specifications – Plans and specifications for services to be provided. Plans and specifications are a part of this Report whether or not separately bound.
Cost Estimate – An estimate of the annual cost of services to be provided. Also included, are administrative and incidental costs that include maintenance, reserve, repairs, and rehabilitation expenses.
Assessment Roll – An assessment roll, showing the amount to be assessed against each parcel of real property within this District and the names and addresses of the property owners. An Assessor’s Parcel number or other designation describes each parcel. Each parcel is also assigned an “assessment number” that links the Assessment Roll to the Assessment Diagram.
Method of Assessment – A statement of the method by which the Assessment Engineer determined the amount to be assessed against each parcel, based on special benefits to be derived by each parcel from the Improvements.
Assessment Diagram – A diagram showing all of the parcels of real property to be assessed within this District. The diagram corresponds with the Assessment Roll by assessment number.
Termination of District/Limitations of Report – A statement as to the duration of the District and the accuracy of the data and information necessary for the development of this annual Report.
NOW THEREFORE, the undersigned, acting as an agent for DTA, Assessment Engineer for the District, by virtue of the power vested under the 1972 Act and the order of the City, hereby submits this Engineer’s Report and makes the following assessment to cover the portion of the estimated costs of the Improvements, including the incidental costs and expenses, to be paid by the District.
The net assessment in Fiscal Year 2024-2025 is summarized in Table 1. 164
4 SECTION II
ENGINEER’S REPORT
City of Soledad June 19, 2024
FINAL Engineer’s Report for Rancho San Vicente MAD No. 1 www.FinanceDTA.com
Table 1: Net Assessment for Fiscal Year 2024-2025
*Note: Figures may not sum due to rounding. DTA does hereby assess the net amount to be assessed upon all assessable lots or parcels of land within the District by apportioning the amount allocable among the several lots or parcels of each in proportion to the estimated special benefits to be received by each such lot or parcel from the Improvements, as more particularly set forth in the list attached as Appendix A (“Assessment Roll”) and by this reference made as part of this Engineer’s Report.
The District diagram appearing herein is a representation of the assessment diagram that was approved by resolution of the City Council. Reference is hereby made to the Assessor’s Maps of the County of Monterey for Fiscal Year 2024-2025 for a more particular description of the properties within the District. Each parcel of land assessed is described on the Assessment Roll by reference to its parcel number as shown on the County of Monterey Assessment Roll.
DTA
Kuda Wekwete Date
Managing Director
Stephen A. Runk, P.E. Date
License Number: C23473
Item Amount
Maintenance Costs $85,369
Administration Costs $36,683
Levy Adjustments (Reserve Fund Credit) ($12,217)
Net Assessment* $109,834
165
5 SECTION III
PLANS AND SPECIFICATIONS
City of Soledad June 19, 2024
FINAL Engineer’s Report for Rancho San Vicente MAD No. 1 www.FinanceDTA.com
III PLANS AND SPECIFICATIONS
The plans, specifications, and studies of the Improvements for this District are voluminous and will not be bound in this Report, but by this reference are incorporated as if attached to this Report. The plans and specifications are on file with the City of Soledad and/or the County of Monterey, California.
A Description of the District
The District is generally bounded by existing Vista Soledad Phases I and II to the northeast, by San Vicente Townhomes to the southwest, West Street to the southeast, and San Vicente Road to the northwest. A District diagram incorporated herein under Section VII of this Report outlines the boundaries of the District. This diagram incorporates all lots, parcels, and subdivisions of land within the District as the same existed at the time this Report was prepared, a complete listing of which is provided in Appendix A of this Report.
B District Improvements, Facilities, and Services
The following descriptions, provided in the formation documents of the District, identify the types of improvements that will be maintained by the District. Detailed maps and descriptions of these improvements are on file with the City and are available for inspection in the office of the City Engineer and have been incorporated into this Report by reference.
B.1 Street Light, Landscape, and Irrigation Improvements The maintenance and operation of the improvements located on landscaped strips (of land adjacent to curbs of the streets identified below within the District) includes the following: jogging paths, planter walls, grass berms, and appurtenant irrigation systems, as well as ornamental plantings such as lawns, shrubs, and trees. Also included are necessary repairs, replacements, water, electric current, spraying, care, supervision, debris removal, and any and all other items of work necessary and incidental for the proper maintenance and operation thereof. Additionally, maintenance and operation includes all additions, improvements, and enlargements which may be made on the previously described work within the following streets and on appurtenant improvement plans.
Improvements that are covered under the maintenance and operations of the District are located on the following streets:
West Street and San Vicente Road;
Northwest side of West Street from Market Street to the Vista Soledad Subdivision; and
Easterly side of San Vicente Road from San Vicente Townhomes north to the Vista Soledad Subdivision.
166
6 SECTION III
PLANS AND SPECIFICATIONS
City of Soledad June 19, 2024
FINAL Engineer’s Report for Rancho San Vicente MAD No. 1 www.FinanceDTA.com
B.2 Incidental and Other Expenses
Incidental costs include contingencies and assessment district incidentals such as engineering, printing, notices to property owners, collection costs, legal fees, administration, and supervision.
167
7 SECTION IV
COST ESTIMATE
City of Soledad June 19, 2024
FINAL Engineer’s Report for Rancho San Vicente MAD No. 1 www.FinanceDTA.com
IV COST ESTIMATE
Applicable law requires the Engineer’s Report to contain an estimate of the costs of the Improvements for Fiscal Year 2024-2025, including estimates of (i) the total costs for Improvements for Fiscal Year 2024-2025, including incidental expenses, (ii) the amount of any surplus in the improvement fund to be carried over from a previous Fiscal Year, (iii) the amount of any contributions to be made from sources other than assessments levied pursuant to this part, (iv) the amount, if any, of the annual installment for the Fiscal Year where the legislative body has ordered an assessment for the estimated cost of any improvements to be levied and collected in annual installments, and (v) the net amount to be assessed upon assessable lands within the District. Estimates of these amounts are provided below.
The following describes the costs that are funded through the District.
A Costs of Improvements
A.1 Projected Annual Maintenance Costs
Included in the City’s Public Works Department Budget Request are estimated costs for the annual maintenance and servicing of all improvements within the District.
District direct maintenance expenses are estimated at $85,369 for Fiscal Year 2024- 2025 as shown in Table 2 below.
Table 2: Projected Annual Direct Maintenance Costs
Item Description Cost Estimate
Park Maintenance $27,380
Street Landscaping $20,535
Parkway Water Charges $24,667
Park Water Charges $3,423
Park Electrical Charges $1,369
Sound Wall Maintenance $5,205
Street Lighting Electrical and Replacement $2,790
Operating Reserve Fund Collection $0.00
Total $85,369
*Note: Figures may not sum due to rounding.
168
8 SECTION IV
COST ESTIMATE
City of Soledad June 19, 2024
FINAL Engineer’s Report for Rancho San Vicente MAD No. 1 www.FinanceDTA.com
A.2 Projected Annual Administration Costs
In addition to the costs listed above, there will be costs attributed to the administration of the District. As shown in Table 3, the District administration costs are estimated to be $36,683 for Fiscal Year 2024-2025. These costs are summarized below.
Table 3: Projected Annual Administration Costs
Item Description Cost Estimate
City Administration $29,878
District Administration $5,000
Printing and Advertising $500
County Collection $1,305
Total* $36,683
*Note: Figures may not sum due to rounding.
A.3 Projected Annual Levy Adjustment
Finally, in addition to the costs listed above, certain levy adjustments will be made to account for any operating reserve credits or required capital collection to the District’s reserve fund. As shown in Table 4, an Operating Reserve Credit of $33,505 has been applied to offset the required Capital Reserve Collection of $21,289. Therefore, a net total of $12,217 Reserve Fund Credit has been applied to the Fiscal Year 2024-2025 assessment. Table 4: Projected Annual Levy Adjustment Item Description Cost Estimate
Capital Reserve Collection $21,289
Operating Reserve Credit ($33,505)
Total* ($12,217) *Note: Figures may not sum due to rounding. B Annual Cost Indexing B.1 City/District Administration, Printing, and Advertising With the passage of Proposition 218, any proposed increase in assessments must be approved by impacted property owners via a mail ballot and public hearing process, similar to these proceedings. A weighted simple majority of ballots received (weighted according to each parcel’s proportionate assessment obligation) must be affirmative for the City Council to confirm and levy the increased assessments. For small assessment districts or districts with relatively low dollar assessments, the cost of an Engineer’s Report, balloting, and the public hearing process can potentially exceed the total amount of the increase. The incidental costs of these proceedings 169
9 SECTION IV
COST ESTIMATE
City of Soledad June 19, 2024
FINAL Engineer’s Report for Rancho San Vicente MAD No. 1 www.FinanceDTA.com
may be added to the assessments, resulting in even higher assessments.
Therefore, adjusting assessments annually by 3.00% allows for minor increases in normal maintenance and operating costs, without incurring the costs of ballot proceedings required by Proposition 218. Any other significant changes to the District (e.g., increases in service, modification of the boundary, etc.) would still require Proposition 218 proceedings and, ultimately, property owner approval.
Thus, on each July 1, commencing on July 1, 2004, the maximum authorized unit assessment rates established in these proceedings will be indexed (increased) annually by 3.00% from the preceding Fiscal Year.
Since the maximum assessment is likely sufficient to cover the cost estimates for improvements and other expenses for Fiscal Year 2024-2025, an amount equal to only the total projected costs will be assessed on the property within the District.
The assessment levy in future years may be any amount less than or equal to the maximum assessment in that year.
B.2 Collection Fees
The County Auditor/Controller also charges an additional 0.25% of the total amount assessed.
B.3 Reserve Collection/Transfer
The applicable law provides for a District Reserve Fund that provides for the collection of funds to cover District operations between July 1 (beginning of the Fiscal Year) and the date on which the County remits first installment of assessments collected from the property tax bills (typically January or February). Any negative amounts entries for this budget item represent transfers from the Reserve Fund to reduce the assessment in a given fiscal year. A fully funded Reserve enables the District to (i) cover operational expenses incurred in the six (6) months of the fiscal year, without any City funds from non-District accounts; and (ii) address any unforeseen or unusual expenditures that may occur during the year.
C Contributions from Other Sources
Proposition 218 provides that “an agency shall separate the general benefits from the special benefits conferred…” In accordance with that provision, it is determined that there will be no general benefit from the Improvements in Fiscal Year 2024-2025, as explained in Section VI of this Report.
D Annual Installments
The entire amount of the net assessment, as shown in Table 5 below, will be assessed in Fiscal Year 2024-2025.
170
10 SECTION IV
COST ESTIMATE
City of Soledad June 19, 2024
FINAL Engineer’s Report for Rancho San Vicente MAD No. 1 www.FinanceDTA.com
E Net Assessment
Pursuant to the foregoing, Table 5 shows the net amount to be assessed upon assessable lands within the District in Fiscal Year 2024-2025. Table 5: Net Assessment for Fiscal Year 2024-2025 Item Total Costs Special Benefit
Allocated Net Assessment
Maintenance Costs (Direct)
Park Maintenance $27,380 100% $27,380
Street Landscaping $20,535 100% $20,535
Parkway Water Charges $24,667 100% $24,667
Park Water Charges $3,423 100% $3,423
Park Electrical Charges $1,369 100% $1,369
Sound Wall Maintenance $5,205 100% $5,205
Street Lighting Electrical and Replacement $2,790 100% $2,790 Operating Reserve Fund Collection $0 100% $0
Administration Costs
City Administration $29,878 100% $29,878
District Administration $5,000 100% $5,000
Printing and Advertising $500 100% $500
County Collection $1,305 100% $1,305
Levy Adjustments
Capital Reserve Collection $21,289 100% $21,289
Operating Reserve Credit ($33,505) 100% ($33,505)
Net Assessment* $109,834 N/A $109,834
*Note: Figures may not sum due to rounding.
171
11 SECTION V
ASSESSMENT ROLL
City of Soledad June 19, 2024
FINAL Engineer’s Report for Rancho San Vicente MAD No. 1 www.FinanceDTA.com
V ASSESSMENT ROLL
The Assessment Engineer has prepared an Assessment Roll for the District as required by applicable law, based upon the assessment methodology described in this Engineer’s Report. The Assessment Roll includes the net total assessment for Fiscal Year 2024-2025 and shows the Fiscal Year 2024-2025 assessment, assessment number, Assessor’s Parcel Number, and land use designation for each parcel.
The Assessment Roll, as provided in Appendix A, lists the Assessor’s Parcel Numbers within this Assessment District by assessment number. The assessment numbers appearing on the Assessment and the names and addresses of the property owners are as shown on the last equalized assessment roll for taxes or as known to the Assessor of Monterey County.
All parcel information has been provided to DTA by the City Public Works Department, the previous Assessment Engineer, and the County of Monterey. 172
12 SECTION VI
METHOD OF ASSESSMENT
City of Soledad June 19, 2024
FINAL Engineer’s Report for Rancho San Vicente MAD No. 1 www.FinanceDTA.com
VI METHOD OF ASSESSMENT
A Background
Pursuant to the 1972 Act, the legislative body establishes and determines the “estimated benefit received” by each parcel from the Improvements.
In addition, Article XIIID of the California Constitution, added in November 1996 through the passage of Proposition 218 by voters of the State of California, requires, inter alia, that (i) only special benefits be assessable, (ii) no assessment may exceed the proportional special benefit conferred on the parcel assessed, and (iii) publicly owned parcels shall not be exempt from assessment unless clear and convincing evidence demonstrates that such publicly owned parcels receive no special benefits from the improvements for which the assessment is levied.
“Special benefit” is a particular and distinct benefit over and above general benefits conferred on real property located in the District or to the public at large. Importantly, the general enhancement of property value does not constitute special benefit. As such, this Engineer’s Report has been designed to comply with these requirements, as well as to incorporate recent California court decisions such as: Silicon Valley Taxpayers Association, Inc. v. Santa Clara County Open Space Authority (2008), Beutz v. County of Riverside (2010), Golden Hills Neighborhood Association v. City of San Diego (2011), and Concerned Citizens v. West Point Fire Protection District (2011). Methodologically, it is necessary and essential to identify the special benefit that the improvements, facilities, and services will render to the properties within the District. It is also necessary that the properties receive a special and direct benefit as distinguished from benefit to the general public.
The Assessment Engineer is appointed for the purpose of analyzing the facts and determining the method and formula for apportionment of the assessment obligation to the benefited properties. For these proceedings, the City has retained the firm of DTA as the Assessment Engineer.
The Assessment Engineer makes his or her recommendation for the method of apportionment in this Engineer’s Report for consideration at the public hearing. However, the final authority and action rests with the City Council after hearing all testimony and evidence presented at the public hearing. Upon conclusion of the public hearing, the City Council must make the final action in determining that the assessment has been made in direct proportion to the special benefit received.
In determining the net amount to be assessed upon parcels within the District, Section 22573 of the California Streets and Highways Code states that such amount “may be apportioned by any formula or method which fairly distributes the net amount among all assessable lots or parcels in proportion to the estimated benefits to be received by each such lot or parcel from the improvements.”
173
13 SECTION VI
METHOD OF ASSESSMENT
City of Soledad June 19, 2024
FINAL Engineer’s Report for Rancho San Vicente MAD No. 1 www.FinanceDTA.com
Proposition 218 further states that “no assessment shall be imposed on any parcel which exceeds the reasonable cost of the proportional special benefit conferred on that parcel,” where “special benefit” means “a particular and distinct benefit over and above general benefits conferred on real property located in the District or to the public at large.” This Section VI describes the methodology used to calculate the net amount to be assessed on each parcel within the District in proportion to the special benefit conferred on each such parcel.
B Benefits of Improvements
The special benefits associated with the local landscaping improvements are shown in the Table 6 below.
Table 6: Benefits from Landscaping Improvements
Landscaping Improvements
Enhanced desirability of properties through association with the improvements. Improved aesthetic appeal of properties within the District providing a positive representation of the area. Enhanced adaptation of the urban environment within the natural environment from adequate green space and landscaping. Environmental enhancement through improved erosion resistance, and dust and debris control. Increased sense of pride in ownership of property within the District resulting from well-maintained improvements associated with the properties. Reduced criminal activity and property-related crimes (especially vandalism) against properties in the District through well-maintained surroundings and amenities including abatement of graffiti. Enhanced environmental quality of the parcels within the District by moderating temperatures, providing oxygenation, and attenuating noise. The special benefits of street lighting are the convenience, safety, and security of property, improvements, and goods as identified in Table 7 below.
Table 7: Benefits from Street Lighting Improvements
Street Lighting Improvements
Enhanced deterrence of crime and the aid to police protection. Increased nighttime safety on roads and highways. Improved ability of pedestrians and motorists to see. Improved ingress and egress to property. Reduced vandalism and other criminal acts and damage to improvements or property. Improved traffic circulation and reduced nighttime accidents and personal property loss. Increased promotion of business during nighttime hours in the case of commercial properties. 174
14 SECTION VI
METHOD OF ASSESSMENT
City of Soledad June 19, 2024
FINAL Engineer’s Report for Rancho San Vicente MAD No. 1 www.FinanceDTA.com
C Categories of Benefit
Proposition 218 provides that “an agency shall separate the general benefits from the special benefits conferred on a parcel,” where “Special Benefit means a particular and distinct benefit over and above general benefits conferred on real property located in the district or to the public at large.” It is therefore necessary to establish definitions of General Benefit and Special Benefit as such terms relate to the benefit to be derived from the Improvements.
The following special benefit allocation was determined at the time the District was formed.
The Improvements to be maintained and operated in the District were within or in areas in close proximity to the proposed developed residential lots. As a result, the developed residential lots in the District will receive 100% of the special benefits of the operation and maintenance of the Improvements. These special benefits include enhanced neighborhood identity and quality of life generated when park landscaping and lighting are in place, improved, operable, safe, clean, and maintained. In short, maintenance and operation of the proposed improvements will provide beautification, shade, and increase the desirability of the immediate surroundings of the residential units within the District. Importantly, because of the location of the improvements within or close to the District itself, there is no general benefit to properties outside the District or the community as a whole. Any such general benefit is so incidental and negligible that it cannot be calculated for purposes of assessment.
D Allocation of Special Benefit to Parcels
As discussed previously, developed parcels in the District are the only parcels that derive special benefit from maintenance and operations and as such, must bear the cost of these activities. As a result, all costs associated with the maintenance and operation of District Improvements, including incidentals and appurtenances, shall be spread to all parcels within the District on a development unit basis.
Factored development unit calculations for residential areas are as follows:
Low Density Residential = 1.0 Unit/Residential Lot Single-Family Unit Apartment Unit = 0.8 Unit/Apartment
[0.8 Unit/Apartment x Apartment Units = Equivalent Single-Family Unit (“ESFU”)] Importantly, Article XlllD provides that publicly owned properties must be assessed unless there is clear and convincing evidence that those properties receive no special benefit from the assessment. As a result, the following property will be considered exempt from the assessment: areas of public streets, public avenues, public lanes, public roads, public drives, public courts, public alleys, public easements and right-of-way, public greenbelts and public parkways, and that portion of public property that is not developed and used for business purposes similar to private commercial, industrial, and institutional activities. 175
15 SECTION VI
METHOD OF ASSESSMENT
City of Soledad June 19, 2024
FINAL Engineer’s Report for Rancho San Vicente MAD No. 1 www.FinanceDTA.com
E Amount of Assessment
Pursuant to the foregoing, Table 8 below shows the net amount to be assessed upon assessable lands within the District in Fiscal Year 2024-2025. Table 8: Fiscal Year 2024-2025 Assessment Rates in the District Assessment Per EDU
Fiscal Year 2023-2024
Assessment Per EDU
Fiscal Year 2024-2025
Max Assessment Per EDU
Fiscal Year 2024-2025
$795.79 $819.66 $819.66
176
16 SECTION VI
METHOD OF ASSESSMENT
City of Soledad June 19, 2024
FINAL Engineer’s Report for Rancho San Vicente MAD No. 1 www.FinanceDTA.com
Table 9: Fiscal Year 2024-2025 Cost Estimate
177
17 SECTION VII
ASSESSMENT DIAGRAM AND
BOUNDARY MAP
City of Soledad May 15, 2024
PRELIMINARY Engineer’s Report for Rancho San Vicente MAD No. 1 www.FinanceDTA.com
VII ASSESSMENT DIAGRAM AND BOUNDARY MAP
The boundary map for the District has been previously approved and submitted to the City in the format required by the 1972 Act, and is on file in the Office of the City Clerk.
The parcels within the District generally consist of the lots, parcels, and subdivisions of land found within the following Assessment Diagram and are based on the Monterey County Assessor’s Maps and the Monterey County Assessor’s information that existed at the time this Report was prepared.
178
18 SECTION VII
ASSESSMENT DIAGRAM AND
BOUNDARY MAP
City of Soledad May 15, 2024
PRELIMINARY Engineer’s Report for Rancho San Vicente MAD No. 1 www.FinanceDTA.com
Figure 1: Boundary Map
179
19 SECTION VIII
TERMINATION OF
DISTRICT/LIMITATIONS OF
REPORT
City of Soledad July 19, 2023
FINAL Engineer’s Report for Rancho San Vicente MAD No. 1 www.FinanceDTA.com
VIII TERMINATION OF DISTRICT/LIMITATIONS OF REPORT
A Termination of District
Assessments associated with the District will be levied each Fiscal Year until the District is dissolved by the City Council.
B Limitations of Report
The conclusions, calculations, and recommendations in this Report rely on the substantial data and information provided to DTA at the time of the writing of the Report by the following parties:
1. City of Soledad, specifically the Public Works Department;
2. The previous Assessment Engineer; and
3. The County of Monterey.
180
APPENDIX A
City of Soledad
Rancho San Vicente Parks and Open Spaces
Maintenance Assessment District
Fiscal Year 2024-2025
ASSESSMENT ROLL
181
99 ALMADEN BLVD., SUITE 875
SAN JOSE, CA 95113
PHONE: (800) 969-4DTA
Public Finance
Public-Private Partnerships
Development Economics
Clean Energy Bonds
www.FinanceDTA.com
182
SUBJECT: Ordinance No. 769, Consider Waiver of Reading, Adoption and Read by Title Only Ordinance No. 769 “An Ordinance of the City Council of the City of Soledad Establishing a New Truck Route Pursuant to Chapter
10.62 Truck Routes of Title 10-Vehicles and Traffic of the Soledad Municipal Code"
TO: Honorable Mayor Velazquez and City Council
FROM: Leon Gomez, Interim City Engineer
MEETING DATE: June 19, 2024
CITY OF SOLEDAD
STAFF REPORT
THROUGH: Megan Hunter, City Manager
AGENDA ITEM NO. 1.
Recommendation
It is recommended that the City Council consider waiver of reading, adoption, and reading by title only Ordinance No. 769, Establishing a New Truck Route Pursuant to Chapter 10.62 Truck Routes of Title 10- Vehicles and Traffic of the Soledad Municipal Code.
Executive Summary
In August 2022, the City Council adopted Ordinance No. 745 which provides the City Council with the ability to establish new truck routes in the City. At the same time Ordinance No. 745 was adopted, the Council also established a New Truck Route upon a recommendation from the former City Engineer.
This recommendation was based on concerns with trucks travelling through the roundabout at East Street/Metz Road/North Street, with the intent of directing trucks to Gabilan Drive and Orchard Lane, which were more recently constructed streets with wider roadway widths and better pavement sections.
However, since that time, City Staff, truck drivers, and the community have expressed a number of concerns regarding the New Truck Route. As a result, Council requested an evaluation of the New Truck Route vs. the Old Truck Route which led to a determination that the Old Truck Route is safer, shorter in length, and has less interface with schools than the New Truck Route. As such, Staff is now recommending that the City reestablish the Old Truck Route as the official truck route in the City.
Background
Section 35701 of the California Vehicle Code allows local authorities, by ordinance, to designate street segments on which commercial trucks must travel to reduce the impact of truck traffic in residential neighborhoods and other sensitive areas and minimizing damage to streets and related improvements.
In order to enforce the designated truck routes, the City Council must adopt an ordinance specifying which
183
street segments commercial trucks are required to utilize, and signs must be installed to designate truck routes.
In 2022, after reviewing the City’s Old Truck Route, and considering new housing developments and traffic flow impediments and challenges, the City Engineer and staff concluded that a New Truck Route, based in part on recent Orchard Lane vehicle counts, would better suit the City’s truck routing needs. The need for a new truck route was also based in part on the assumption that the City’s new roundabout at the intersection of East Street/Metz Road/North Street was not designed for large tractortrailers to safely traverse. Attachment A hereto shows the City’s current truck route. After soliciting and receiving limited public input on the matter, the Council adopted Ordinance No. 745 on August 17, 2022, which served the dual purpose of: 1) providing the City Council with authority to establish new truck routes by ordinance, and 2) approving a New Truck Route. Ordinance No. 745 also provided signage requirements for truck routes and exceptions to use of established truck routes. In adopting the New Truck Route, the Council extinguished the Old Truck Route. See Attachment B - Old Truck Route.
Based on the considerations set forth below, the City Engineer and Staff are now recommending that the Old Truck Route (shown on Attachment B), be established by ordinance as the new official truck route in the City.
Review & Analysis
In adopting the new truck route in 2022, the Council requested Staff to monitor the new route and periodically report on its use. Public works staff also engaged the City’s on-call Traffic Engineer, TL Engineering, to re-evaluate the New and Old Truck Routes. TL Engineering performed a thorough review of both the New and Old Truck Routes considering six (6) criteria and determined the following:
Total length and Vehicle Miles Traveled (VMT): the Old Truck Route is shorter and represents fewer Vehicle Miles Traveled for users, thus reducing the impact of truck traffic on City streets.
Collision Data: there were fewer collisions along the Old Truck Route, indicating that it is a safer route.
Presence of schools: there are fewer schools along the Old Truck Route.
Presence of safety measures: there are more existing safety measures along the Old Truck Route.
Turning movements: minor improvements at the East Street/Metz Road/North Street roundabout can be made to better facilitate truck turning movements.
Truck route signage: the Old Truck Route will require less signage.
Based on the foregoing, and after public outreach and input from local schools, truck companies and the Police and Public Works Departments, the City’s Contract Interim City Engineer and City Staff are recommending that the City reestablish the Old Truck Route as the new official truck route in the City.
Ordinance No. 769 will simply replace the current Truck Route with the Old Truck Route and direct the City Engineer to cause the new designated route to be placed on the City’s “List of Truck Routes.
On May 15, 2024, the City Council received public comment, waived reading, introduced and read by title Ordinance No. 769. A noticed public hearing was thereafter scheduled for the June 19, 2024, Council meeting for consideration of adoption of Ordinance No.769.
Financial Considerations
None, other than signage requirements.
184
Attachment A-Current Truck Route
Attachment B-Old Truck Route
Attachment C-Public Notice - Ord. No. 769
Ordinance No. 769
Exhibit A-Old Truck Route
Alternatives
Consider waiver of reading, adoption and ready by title Ordinance No. 769.
Deny introduction and provide Staff with direction.
Planning/CEQA
The adoption of this ordinance is exempt from the California Environmental Quality Act, based on 14 California Code of Regulations Section 15061(b)(3), since it can be seen with certainty that the establishment of a truck route on existing streets within the City, part of a circulation system that has been previously analyzed and approved by City action and is currently in use for vehicular transportation, creates no possibility of a significant effect on the environment.
Public Notice Requirements
A public hearing for consideration of adoption of Ordinance No. 769 was noticed for this matter for the meeting of June 19, 2024.
Attachment(s):
185
April 2022 TRUCK ROUTES
New Truck Routes:
Metz to East Hwy 101 - 2.93 Miles
Metz to South Hwy 101 - 3.27 Miles
Hwy 101 to Hwy 101 - 1.63 Miles
Attachment B
High School Elementary Schools School Crossing Attachment A 186
April 2022
Existing Truck Routes:
Metz to East Hwy 101 - 2.2 Miles
Metz to South Hwy 101 - 1.7 Miles
Hwy 101 to Hwy 101 - 1.63 Miles
TRUCK ROUTES
A
School Crossing Elementary Schools High School Attachment B 187
188
ORDINANCE NO. 769
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF SOLEDAD ESTABLISHING A NEW TRUCK ROUTE PURSUANT TO CHAPTER 10.62- TRUCK ROUTES OF TITLE 10-VEHICLES AND TRAFFIC
OF THE SOLEDAD MUNICIPAL CODE
WHEREAS, Vehicle Code Section 35701 of the California Vehicle Code allows local authorities, by ordinance, to designate street segments on which commercial trucks must travel to reduce the impact of truck traffic in residential neighborhoods and other sensitive areas and minimizing damage to streets and related improvements; and WHEREAS, in August of 2022, based on authority set forth in Vehicle Code Section 35701, the City Council adopted Ordinance No. 745- “Adding New Chapter 10.62 Truck Routes to Title 10-Vehicles and Traffic of the Soledad Municipal Code and Establishing a Truck Route” which provided the City Council with the ability to establish new truck routes in the City. At the same time Ordinance No. 745 was adopted, the Council also established a New Truck Route in the City based on a recommendation from the former city engineer; and WHEREAS, since the time of the adoption of the New Truck Route, City Staff, truck operators, school officials and members of the public have expressed concerns with the new route; and
WHEREAS, based on the above-referenced concerns, Public Works staff engaged the City’s on-call Traffic Engineer, TL Engineering, to re-evaluate the New and Old Truck Routes.
TL Engineering performed a thorough review of both the New and Old Truck Routes considering six (6) criteria and determined the following:
Total length and Vehicle Miles Traveled (VMT): the Old Truck Route is shorter and represents fewer Vehicle Miles Traveled for users, thus reducing the impact of truck traffic on City streets.
Collision Data: there were fewer collisions along the Old Truck Route, indicating that it is a safer route.
Presence of schools: there are fewer schools along the Old Truck Route. Presence of safety measures: there are more existing safety measures along the Old Truck Route.
Turning movements: minor improvements at the East Street/Metz Road/North Street roundabout can be made to better facilitate truck turning movements. Truck route signage: the Old Truck Route will require less signage; and WHEREAS, based on the aforesaid input and findings, the City’s Contract Interim City Engineer and City Staff are recommending that the City reestablish the Old Truck Route as the new official truck route in the City.
NOW THEREFORE, BE IT HEREBY ORDAINED by the Soledad City Council as follows:
189
Section 1. Adoption of Truck Route. The truck route depicted on “Exhibit A” hereto, which has been recommended for adoption by the Interim City Engineer and is incorporated herein by reference, is hereby adopted as the Official Soledad Truck Route. The Interim City Engineer is directed to add the route to the City’s List of Truck Routes. The only other route currently on this list shall be removed and of no further effect.
Section 2. CEQA Compliance. The adoption of this ordinance is exempt from the California Environmental Quality Act, based on 14 California Code of Regulations Section 15061(b)(3), since it can be seen with certainty that the establishment of a truck route on existing streets within the City, part of a circulation system that has been previously analyzed and approved by City action and is currently in use for vehicular transportation, creates no possibility of a significant effect on the environment.
Section 3. Effective Date. This Ordinance shall become effective on the thirty-first day following adoption.
This ordinance was introduced and read on the 15th day of May, 2024 and was finally adopted on the 19th day of June, 2024, by the following vote:
AYES, and in favor thereof, Councilmembers:
NOES, Councilmembers:
ABSENT, Councilmembers:
ABSTAIN, Councilmembers:
Anna Velazquez, The Honorable Mayor
ATTEST:
_______________________________
Megan Hunter, City Clerk
190
April 2022
Existing Truck Routes:
Metz to East Hwy 101 - 2.2 Miles
Metz to South Hwy 101 - 1.7 Miles
Hwy 101 to Hwy 101 - 1.63 Miles
TRUCK ROUTES
A
191
SUBJECT: Resolution No. 6115, A Resolution of the City Council of the City of Soledad Approving and Accepting the S9oledad Police Department's AB 481 Fiscal Year 2023-2024 Annual Military Equipment Use Report Pursuant to Government Code Section 7071 (d) and Renewing City of Soledad Ordinance No. 743 "Approving Soledad Police Department Policy Manuel Policy 706- Military Equipment"
TO: Honorable Mayor Velazquez and City Council
FROM: Mike Rodriquez, City Attorney
MEETING DATE: June 19, 2024
CITY OF SOLEDAD
STAFF REPORT
THROUGH: Megan Hunter, City Manager
AGENDA ITEM NO. 1.
Recommendation
It is recommended that the City Council consider and adopt Resolution No.6115, Approving and Accepting the Soledad Police Department’s AB 481 Fiscal Year 2023-2024 Annual Military Equipment Report Pursuant to Government Code Section 7071(d) and Renewing City of Soledad Ordinance No. 743 “Approving Soledad Police Department Policy Manual Policy 706-Military Equipment.” Executive Summary
Pursuant to the requirements of AB 481, the City Council previously adopted Ordinance No. 743 approving Soledad Police Department Policy Manual Policy 706. Policy 706 establishes an inventory of “military equipment” possessed and/or acquired by the Soledad Police Department, explains why such equipment may be used by the Department, why such use is deemed necessary, and the costs associated with maintaining and storing such equipment. AB 481 is seen as a transparency law, informing both the Council and the community of the possession and potential use of such equipment.
AB 481 also establishes the requirement that the ordinance adopting a military equipment use policy must be reviewed and renewed on an annual basis. To facilitate this review, the Police Department is required to prepare an Annual Report concerning the use of the Department’s military equipment.
The Police Department’s AB 481 Fiscal Year 2023-2024 Annual Military Equipment Report, which was submitted to the Council on May 15, 2024, and Ordinance No. 743, are before the Council this evening for consideration of acceptance and renewal respectively Background
192
Effective January 1, 2022, Assembly Bill 481 (codified in Government Code Section 7070 et seq.) requires legislative bodies to adopt ordinances approving military equipment policies before law enforcement agencies can continue to engage in specified activities related to the use of what the state legislature has defined as “military equipment” in Government Code Section 7070. The Soledad Police Department Military Equipment Policy was approved by the City Council by Ordinance No. 743 on June 15, 2022.
Government Code Section 7071(e)(1) states that a governing body shall review any ordinance that it has adopted pursuant to this section approving the funding, acquisition, or use of military equipment at least annually and, subject to paragraph (e)(2), to vote on whether to renew the ordinance at a regular meeting.
Paragraph (e)(2) of Government Code Section 7071 states that the governing body shall determine, based on an annual report, whether each type of military equipment identified in that report has complied with the standards for approval set forth in subdivision (d) of Section 7071, which reads as follows:
A. The military equipment is necessary because there is no reasonable alternative that can achieve the same objective of officer and civilian safety.
B. The proposed military equipment use policy will safeguard the public’s welfare, safety, civil rights, and civil liberties.
C. If purchasing the equipment, the equipment is reasonably cost-effective compared to available alternatives that can achieve the same objective of officer and civilian safety.
D. Prior military equipment use complied with the military equipment use policy that was in effect at the time, or if prior uses did not comply with the accompanying military equipment use policy, corrective action has been taken to remedy nonconforming uses and ensure future compliance.
If the governing body determines that a type of military equipment identified in its annual military equipment report has not complied with the standards for approval set forth above, the governing body shall either disapprove a renewal of the authorization for that type of military equipment or require modifications to the military equipment use policy in a manner that will resolve the lack of compliance.
In order to facilitate the orderly annual ordinance review referenced above, Government Code Section 7072 requires that any law enforcement agency that receives approval for a military equipment use policy pursuant to Section 7071 shall submit to the government body an annual military equipment report for each type of military equipment approved by the governing body within one year of approval, and annually thereafter for as long as the military equipment is available for use. The law enforcement agency shall also make each annual military equipment report required by this section publicly available on its internet website for as long as the military equipment is available for use. The annual military equipment report shall, at a minimum, include the following information for the immediately preceding year for each type of military equipment:
1. A summary of how the military equipment was used and the purpose of its use.
2. A summary of any complaints or concerns received concerning the military equipment.
3. The results of any internal audits, any information about violations of the military equipment use policy, and any actions taken in response.
4. The total annual cost for each type of military equipment, including acquisition, personnel, training, transportation, maintenance, storage, upgrade, and other ongoing costs, and from what source funds will be provided for the military equipment in the calendar year following submission of the annual military equipment report.
5. The quantity possessed for each type of military equipment. 193
6. If the law enforcement agency intends to acquire additional military equipment in the next year, the quantity sought for each type of military equipment.
A copy of the Soledad Police Department’s AB 481 Annual Report 2023-2024 is attached hereto as Attachment 1.
Review & Analysis
The City Council considered and adopted Ordinance No. 743 “Approving Soledad Police Department Policy Manual Policy 706- Military Equipment” on June 15, 2022. During the June 15 meeting, and the prior meeting at which Ordinance No. 743 was introduced, the Council took comment from the public and discussed the ordinance and involved policy.
On May 15, 2024, the Council received the Police Department’s Annual Report on military equipment.
The Report was thereafter posted on the City’s website on May 17, 2024. Staff also publicized the date and location of the required “Community Engagement Meeting” concerning the Report, set as a part of the City Council’s regular meeting agenda for June 19, 2024, through social media, postings, and as a part of the City Council’s posting of its meeting agenda. Policy 706 has been continuously posted on the City website since adoption.
The Annual Report is meant to provide yearly information about each type of military equipment that was approved by Council. In Soledad, the only military equipment possessed by the Police Department is thirteen (13) M16A2 rifles and ammunition. The Report contains a summary of how equipment was used, any complaints or concerns received about the equipment, and any associated costs related to the equipment’s use. For this reporting period, no new military equipment was purchased, the equipment was only utilized for training purposes, and all costs were contained within budget appropriations. The Report does not seek approval of future acquisitions.
The Council should hold a community meeting to receive comment upon and to discuss the Annual Report. Thereafter, State law requires that the City review and consider renewal of its ordinance and military equipment policy. Since there have been no changes in the types or use of military equipment held by the Police Department in the past year, all of the findings made by the Council in support of the adoption of Policy 706 in 2022 should remain unchanged. As such, staff believes that both the Annual Report and Ordinance and Policy 706 can be renewed for another year by way of resolution finding that the Annual Report has been prepared in accordance with legal requirements and that there have been no changes to the policy and no immediate plans to acquire any additional military equipment. The adoption of a new ordinance is not needed at this time.
Financial Considerations
There will not be any new, unplanned direct fiscal impacts in continuing the ownership and minimal use of equipment already in the Police Department’s inventory or continuing to collaborate with other law enforcement agencies utilizing miliary equipment, including in mutual aid circumstances.
Maintenance costs of existing equipment, if any, is within the Police Department’s budget.
Alternatives
Adopt Resolution No. 6115, "Approving and Accepting the Soledad Police Department’s AB 481 Fiscal Year 2023-2024 Annual Military Equipment Use Report Pursuant to Government Code Section 7071(d) and Renewing City of Soledad Ordinance No. 743 “Approving Soledad Police Department Policy Manual Policy 706-Military Equipment.” 194
Resolution No. 6115
Exhibit A - Soledad Police Department Annual Military Equipment Report Exhibit B - Ordinance No. 743
Council could make changes to the Military Equipment Policy and/or Ordinance No. 743 if the Council determines that there has been non-compliance with standards set forth in subdivision (d) of Section 7071 of the Government Code. Council can also renew or disapprove renewal of the authorization for that type of military equipment or require modifications to the military equipment policy in a manner that will address and resolve lack of compliance.
Planning/CEQA
Not applicable.
Public Notice Requirements
Not applicable
Attachment(s):
195
RESOLUTION NO. 6115
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SOLEDAD APPPROVING AND ACCEPTING THE SOLEDAD POLICE DEPARTMENT’S AB 481 FISCAL YEAR 2023-2024 ANNUAL MILITARY EQUIPMENT USE REPORT PURSUANT TO GOVERNMENT CODE SECTION 7071(D)
AND RENEWING CITY OF SOLEDAD ORDINANCE NO. 743
“APPROVING SOLEDAD POLICE DEPARTMENT POLICY MANUAL
POLICY 706- MILITARY EQUIPMENT”
WHEREAS, Government Code Section 7071 et seq. codifies Assembly Bill 481 and requires legislative bodies to adopt ordinances approving military equipment use policies before law enforcement agencies can continue to engage in activities related to the use of military equipment; and
WHEREAS, the Soledad Police Department has a very limited amount of “military equipment” in its inventory (13 military rifles and ammunition) which is used infrequently; and WHEREAS, during the course of a given year, the Soledad Police Department may engage in limited critical public safety activities in coordination with other jurisdictions in possession of military equipment on police-related matters, including safeguarding the public’s welfare and safety, working on regional task forces, conducting training exercises, providing mutual aid and responding to emergencies; and
WHEREAS, on June 15, 2022, the Soledad City Council adopted Ordinance No. 743 which approved Soledad Police Department Policy Manual Policy 706- Military Equipment which includes an inventory report of the police department’s military equipment and procedures for use and maintenance of the same; and
WHEREAS, Soledad’s Military Equipment Policy 706 establishes a military equipment use policy that is consistent with Police Department’s current practices, complies with the requirements of the Government Code, will continue to ensure ongoing regulation and compliance with the law going forward and will continue to provide a means of community engagement and transparency regarding the use of military equipment by the Department; and WHEREAS, Government Code Section 7071 requires the City Council to conduct an annual review of its ordinance approving the City’s Military Equipment Policy and to vote on whether to renew the ordinance; and
WHEREAS, in order to facilitate the aforesaid ordinance review, the City Council is also required to conduct an annual review of the Police Department’s AB 481 Fiscal Year 2023-2024 Annual Report on military equipment prepared and submitted pursuant to Sections 7071 and 7072 of the Government Code; and
196
WHEREAS, notice of the Council’s consideration of both Ordinance No. 743 and the AB 481 Annual Report have been provided in accordance with applicable law; and WHEREAS, the City Council desires to find that the AB 481 Annual Report on military equipment complies with the standards of approval set forth in subdivision (d) of Government Code Section 7071 because of the following:
1. Authorizing the use of military equipment is necessary because there is no reasonable alternative that can achieve the same objective of officer and civilian safety. The use of the Department’s equipment is part of the Department’s overall approach to safe and efficient policing. The equipment will enable department members to properly respond to both planned and unplanned events efficiently and effectively.
2. The Military Equipment Use Policy will safeguard the public’s welfare, safety, civil rights, and civil liberties by ensuring required reporting, the opportunity for community engagement and feedback, and transparency and oversight regarding the acquisition and use of specified military equipment in the City of Soledad.
3. If purchasing equipment, the equipment is reasonably cost-effective compared to available alternatives that can achieve the same objective of officer and civilian safety.
4. Prior military equipment use complied with the military equipment use policy that was in effect at the time of the use; and
WHEREAS, the City Council has also reviewed and desires to renew Ordinance 743.
NOW THEREFORE, BE IT HEREBY RESOLVED by the City Council of the City of Soledad as follows:
1. All of the statements and facts set forth above are true and correct and incorporated herein by this reference. These recitals constitute findings in this matter and together with the staff report, other written reports, public testimony and other information contained in the record, are an adequate and appropriate evidentiary basis for the actions taken in this resolution.
2. The City Council finds that Ordinance No. 743 is exempt from the provisions of the California Environmental Quality Act (“CEQA”) because it will not result on a direct or reasonably foreseeable direct physical change in the environment and is not a “project” as defined in Section 15378 of the CEQA Guidelines.
3. The City Council has reviewed the Soledad Police Department’s Annual Military Equipment Report, a copy of which is attached hereto as Exhibit “A” and by this reference incorporated herein, and finds that it complies with the standards of approval set forth in subdivision (d) of Government Code Section 7071. The report is hereby approved and accepted.
4. The City Council hereby renews Ordinance No. 743 “Approving Soledad Police Department Policy Manual Policy 706-Military Equipment,” a copy of which is attached hereto 197
as Exhibit “B” and by this reference incorporated herein, for a period of one year from the effective date of this resolution without change.
PASSED AND ADOPTED by the City Council of the City of Soledad at a regular public meeting thereof held on the 19th day of June, 2024, by the following vote:
AYES: and in favor thereof, Councilmembers:
NOES: Councilmembers:
ABSENT: Councilmembers:
ABSTAIN: Councilmembers:
______________________________________
ANNA M. VELAZQUEZ, Mayor
ATTEST:
___________________________________
MEGAN HUNTER, City Clerk
198
Soledad Police Department
AB 481 Annual Report 2023-2024
Annual Report
AB 481 requires the Police Department to provide the City Council and the public with a report outlining how the military equipment possessed and/or acquired by the City during the previous year was used in order to ensure the police department is adhering to its policy and the City ordinance concerning military equipment. The Soledad Police Department has not acquired any new equipment that would be considered “military equipment” pursuant to the provisions of Government Code Section 7070 et seq.
1. M16A2 Commando 5.56 patrol carbine rifles
A. A summary of how the military equipment was used and the purpose of its use.
These weapons may be deployed in circumstances in which an officer can articulate a reasonable expectation that the rifle may be needed. (e.g. where an officer anticipates an armed encounter, need for long range fire, where an officer believes a suspect may be wearing body armor). Use of the ammunition for these weapons requires special training for POST certified trainers.
B. A summary of any complaints or concerns received concerning the military equipment. None.
C. The results of any internal audits, any information about violations of the military equipment use policy, and any actions taken in response. None.
D. The total annual cost for each type of military equipment, including acquisition, personnel, training, transportation, maintenance, storage, upgrade, and other ongoing costs, and from what source funds will be provided for the military equipment in the year following submission of the annual military equipment report. Minimal maintenance and training costs, paid for out of Police Department Budget.
E. The quantity possessed of each type of military equipment. Thirteen.
F. If the law enforcement agency intends to acquire additional military equipment in the next year, the quantity sought for each type of military equipment. None.
2. Ammunition for M16A2 Commando 5.56 patrol carbine rifles A. A summary of how the military equipment was used and the purpose of its use. Used for target practice only.
B. A summary of any complaints or concerns received concerning the military equipment. None.
C. The results of any internal audits, any information about violations of the military equipment use policy, and any actions taken in response. None.
D. The total annual cost for each type of military equipment, including acquisition, personnel, training, transportation, maintenance, storage, upgrade, and other ongoing costs, and from what source funds will be provided for the military equipment in the 199
year following submission of the annual military equipment report. No cost for this reporting period.
E. The quantity possessed of each type of military equipment. 7,559 +/- rounds.
F. If the law enforcement agency intends to acquire additional military equipment in the next year, the quantity sought for each type of military equipment. None. 200
ORDINANCE NO. 743
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF SOLEDAD
APPROVING SOLEDAD POLICE DEPARTMENT POLICY MANUAL,
POLICY 706- MILITARY EQUIPMENT
WHEREAS, on September 30, 2021, Governor Gavin Newsom signed into law Assembly Bill 481, relating to the use of military equipment by law enforcement agencies; and WHEREAS, Assembly Bill 481 (AB 481), codified at California Government Code sections 7070 through 7075, requires law enforcement agencies to obtain approval of the applicable governing body, by an ordinance adopting a “military equipment” use policy at a regular meeting held pursuant to open meeting laws prior to taking certain actions relating to the funding, acquisition, or use of “military equipment.” The term “military equipment” is defined in California Government Code Section 7070; and
WHEREAS, AB 481 allows the City Council to approve the funding, acquisition, or use of military equipment, within its jurisdiction only if it makes specified determinations; and WHEREAS, a proposed military equipment use policy is found within Soledad Police Department Policy Manual, Policy 706- Military Equipment (“Policy 706”); and WHEREAS, the policy was published and displayed on the City of Soledad website on April 25, had a public hearing notice concerning its potential adoption published on June 1, 2022 and is being presented to the City Council for adoption on June 15, 2022; and WHEREAS, Policy 706 meets the requirements of California Government Code Section 7070; and
WHEREAS, the Council believes that with respect to Policy 706, 1) the identified equipment is necessary because there is no reasonable alternative that can achieve the same objective of officer and civilian safety; 2) the policy will serve to safeguard the public’s welfare, safety, civil rights, and civil liberties; 3) in future instances in which equipment is to be purchased, the equipment will be reasonably cost effective compared to available alternatives that can achieve the same objective of officer and civilian safety; and 4) corrective action has been taken, as necessary, to ensure that prior nonconforming use of military equipment is in compliance with new policies; and
WHEREAS, by approving Policy 706, the Council will be authorizing the limited use of identified “military equipment” by the members of the Soledad Police Department, and attendant annual reporting and approval of use of such equipment in accordance with Policy 706; and WHEREAS, in the enactment of this ordinance, the City followed the guidelines adopted by the State of California and published in the California Code of Regulations, Title 14, Section 15000, et seq. and found this activity is not a “project” as defined by California Environmental Quality Act (CEQA) because it is an organizational or administrative activity that will not result in direct or indirect physical changes in the environment. 201
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SOLEDAD DOES HEREBY ORDAIN AS FOLLOWS:
SECTION 1. All of the recitals set forth above are true and correct and by this reference are adopted as findings of the City Council as though set forth in full within the body of this ordinance.
SECTION 2. The Council hereby approves City of Soledad Police Department Policy Manual Policy 706-Military Equipment, a copy of which is attached hereto and by this reference incorporated herein. A copy of approved Policy 706 will be added to the City’s website for continuous access by the Council, staff and the public.
SECTION 3. The City Manager is directed to execute all documents and to perform all other acts necessary to implement this Ordinance.
SECTION 4. If any provision, section, paragraph, sentence, clause or phrase of this ordinance, or any part thereof, or the application thereof to any person or circumstance is for any reason held to be invalid or unconstitutional by a court of competent jurisdiction, such decision shall not affect the validity of the remaining portions of this Ordinance, or any part thereof, or its application to other persons or circumstances. The City Council hereby declares that it would have passed and adopted each provision, section, paragraph, subparagraph, sentence, clause, or phrase thereof, irrespective of the fact that any one or more sections, paragraphs, subparagraphs, sentences, clauses or phrases, or the application thereof to any person or circumstance, be declared invalid or unconstitutional.
SECTION 5. This ordinance shall become effective on the thirtieth (30th) day following its passage and adoption hereof.
PASSED AND ADOPTED by the City Council of the City of Soledad this 15th day of June, 2022, by the following vote:
AYES, and in favor thereof Councilmembers: Benjamin Jimenez, Jr., Mayor Anna M. Velazquez, Carla Strobridge, Alejandro Chavez NOES, Councilmembers: None
ABSENT, Councilmembers: Lara
ABSTAIN, Councilmembers: None
_______________________________________
ANNA M. VELAZQUEZ, the Honorable Mayor
ATTEST:
_________________________________
BRENT SLAMA, City Clerk
202
SUBJECT: Resolution No. 6116, A Resolution of the City Council of the City of Soledad Approving Planned Unit Development Permit No. 1 (PUD 2018- 02) Miravale Parcel E Amendment No. 1
TO: Honorable Mayor Velazquez and City Council
FROM: Kao Nou Yang. Community & Economic Development Director and Ariana Mora, Associate Planner
MEETING DATE: June 19, 2024
CITY OF SOLEDAD
STAFF REPORT
THROUGH: Megan Hunter, City Manager
AGENDA ITEM NO. 1.
Recommendation
It is recommended that the City Council of the City of Soledad consider and approve Resolution No. 6116, "Approving Planned Unit Development Permit No. 2018-02 (PUD 2018-02) Miravale Parcel E Amendment No. 1."
Executive Summary
In 2019, the City Council approved a Planned Unit Development for Miravale Santa Clara Subdivision (Parcel E) for 132 housing units. These include 28 multi-family rental units and 104 single-family ownership units. Parcel E was required to provide a total of 52 affordable housing units, consisting of 14 low-income and 14 very-low-income deed-restricted rental units and 24 moderate-income ownership units. Recently, the project developer partnered with Eden Housing, a non-profit agency, to help develop and manage the inclusionary housing requirement. The applicant has proposed amendments to PUD 2018-02 to obtain federal funding for project construction. Proposed changes include an increase in rental units from 28 to 40 and an increase in maximum height for the multifamily buildings from 30 to 40 feet. Amendment No. 1 will not impact the 104 single-family units and will instead provide 40 rental units for very low-income residents. The Soledad Planning Commission approved the requested amendment for recommendation to the City Council with a 3-1 vote during a public hearing on May 22, 2024. The City Council will now conduct the final review and consideration of approval.
Background
On March 6, 2019, PUD 2018-02 was approved by Council through Resolution No. 5482 for 132 housing units, including 104 Single-Family Residential Units and 28 apartment units, on an 8.56-acre parcel owned by Agha Development. After obtaining entitlements, the Project developer entered into 203
an Affordable Housing Agreement with the City of Soledad to construct 28 low-income and very-lowincome rental units and 24 moderate ownership units for a total of 52 affordable housing units.
After careful consideration of the project with partner Eden Housing, an affordable housing non-profit agency, the applicant is proposing a redesign. The proposed redesign is crucial for Eden Housing as it must comply with appropriate property amenities to apply for tax credits in the summer of 2024. The project will serve very low-income families ranging from 30-60% of the Area Median Income (AMI).
The units will remain affordable under regulatory control by the California Tax Credit Allocation Committee ("CTCAC") for a minimum of 55 years.
To qualify the project for tax credits, an amendment to the approved PUD 2018-02 must reflect the additional units, increase the maximum height, and modify parking standards.
Review & Analysis
Planned Development Permit Amendment
As described in Soledad Municipal Code section 17.38.230, Planned Unit Developments (PUD) are intended to promote efficient land use through increased design flexibility and quality site planning.
The planned development concept allows departure from standard property development regulations when development is planned as a unified, integrated whole and incorporates outstanding design features and amenities.
The proposed amendments to PUD 2018-02 are underlined in Exhibit A, attached to this report. The amendments to the project will include a building height increase, parking minimums, and an increase in the number of units to qualify for federal funding and provide affordable rental housing units in Soledad. The proposed amendment will show the new units and relax the development standards (height, parking).
Based on the approved PUD 2018-02, the approved density is 22 units per acre for the 8.55-acre site, establishing a maximum number of 188 units. With the requested changes, the applicant is proposing an increase in the number of multifamily rental units from 28 to 40. The proposed amendment will remain under the approved density as approved through PUD 2018-02. No additional changes will apply to the 104 single-family units, thus providing 144 housing units.
Under SMC 17.14 R-3 Residential High-Density District, buildings have a maximum height of 30 feet.
To use land efficiently and provide the number of proposed affordable units, the applicant and partner propose a maximum height of 40 feet for their project. Modification from the property development standards enables the developer and partner to construct additional units in exchange for providing a public benefit, such as affordable housing units. As the City endeavors to implement the 6th Cycle Housing Element and prioritize affordable housing units, public and private partnerships are imperative to enable developers to leverage the heightened density for enhanced economic value. Simultaneously, adding more affordable housing units accrues benefits to cities and towns, providing maximum effective density and improved aesthetics through increased flexibility in building siting.
Amendment No. 1 to PUD 2018-02 also proposes a change to the minimum off-street parking requirements. The original requirement for the multi-family units was 54 parking spaces, but the applicant now proposes only 50 parking stalls due to the addition of a park and community room amenity. The off-street parking is designed to be integrated into the development to minimize its impact on neighboring properties. According to SMC 17.36.020, the Planning Commission may approve the 204
reduction of parking requirements when special circumstances apply to the property and consistent with SMC 17.36.020. All off-street parking is located within the proposed project area and meet minimum parking counts. Due to the added amenities, special circumstances are applicable for modifying off-street parking requirements, as noted in SMC 17.36.020 and approved through PUD 2018-02.
A PUD permit requires review and consideration by the Planning Commission before a recommendation is made to the City Council for final review. The Planning Commission initially reviewed the proposed changes during a special public hearing to consider findings for recommendation. On May 22, 2024, the Planning Commission conditionally approved PUD 2018-02 Amendment No. 1 with a 3-1 vote. The action taken by the Planning Commission included approval of the parking reduction and a recommendation to waive maximum height restrictions up to 40 feet in height. Planning Commission concerns included but were not limited to parking impact, ingress and egress, height restrictions, and project affordability. The project does not anticipate changes to the subdivision site plan, except for an exemption to the height of the multi-family complex. In regards to parking, the project meets the minimum parking standards for affordable housing of at least 1 parking space per unit.
In regards to affordability, the project will provide 40 very low-income units of affordable housing, which will contribute to the 6th Cycle Regional Housing Needs Assessment (RHNA). Table 1 provides details of the assigned RHNA for Soledad, counting that the 40 low-income units will help fulfill the requirement of 100 very low-income units to meet the RHNA for the 6th cycle update.
Table 1. City of Soledad 6th Cycle RHNA and Projected Pipeline Housing Units for the next eight years (2024-2031).
6th Cycle RHNA Projected Pipeline Projects
Very Low 100 125
Low 65 115
Moderate 183 134
Above Moderate 376 528
To approve a Planned Development Permit or an amendment thereto, the proposed planned development must comply with the requirements set forth in SMC section 17.38.230. Again, PUD 2018-02 was approved, and the City found that the project was consistent with the municipal code requirements. Now, the applicant proposes to change the design of the buildings to accommodate the proposed additional units, including, but not limited to, building height. To approve the proposed amendment to PUD 2018 -02, the City must find that the permit is still consistent with the requirements of SMC section 17.38.230 and, specifically, that the design ensures compatibility and harmony with existing and planned uses on adjacent properties and the project is consistent with the purpose and intent of the off-street parking requirements set forth in section 17.36.020. Staff believes that the revised design remains compatible and in harmony with adjacent properties and that all requirements of SMC section 17.38.230 are met. Furthermore, Staff believes that the proposed parking reduction is still consistent with the intent to the approved use in PUD 2018-02. 2005 General Plan Consistency and Findings:
The proposed PUD 2018-02 Amendment No. 1 is consistent with the 2005 General Plan, specifically:
205
General Plan Policy L19 states, "In general, higher densities of residential development shall be located in areas served by the widest range of urban services, and shall be preferred along collector and arterial streets, within walking distance of schools, city parks, and transit stops.” The proposed development is located within a high-density residential zone and is consistent with the allowable use.
General Plan Policy L18 requires that “The infill of existing residential lots shall be encouraged.” The proposed development is located within an existing infill location along the northeastern property within the City limits.
General Plan Policy H9 states that: “The City of Soledad shall ensure that city site improvement standards, development review procedures, and development fees do not unreasonably constraint the development, conservation, and rehabilitation of housing.” The subject site is designated Multi-family Residential, which allows for the development of multifamily housing such as apartments, condominiums, and townhouses at a density of 13-22 dwelling units per gross acre. In addition, the proposed project plans to develop a community center and other recreational activities to benefit its residents. The project location is also near an elementary school and Santa Barbara Park, Lum, and Peverini Park.
Staf Recommendation:
The City Council may consider the following conclusions that arise from these policies and standards:
The City favors infill development of the type proposed in areas such as this, where urban services are available to serve the estimated 40 rental units.
The City's General Plan prioritizes the design of multi-family housing to achieve neighborhood compatibility and community character objectives, which is higher than achieving maximum density to meet housing objectives.
Staff is seeking City Council action to approve Resolution No. ________ based on the information contained in this report. The approval of PUD 2018-02 Amendment No.1 is essential to provide 40 affordable housing units for low-income residents of Soledad for over a 55-year term. Staff believes it is in the City’s interest to facilitate the creation of these 40 affordable housing units so that Eden Housing can apply for tax credits in the summer of 2024.
Financial Considerations
There will be no impact on the General Fund.
Alternatives
Approve the Resolution to approve Amendment No. 1 to PUD 2018-02 ; or Do not approve the Resolution to approve Amendment No. 1 to PUD 2018-02 and provide staff with direction.
Planning/CEQA
PUD 2018-02 was reviewed and approved in accordance with the California Environmental Quality Act ("CEQA"). A Final Environmental Impact Report (EIR) was prepared for the larger Miravale Partners -Hambey, which includes this Parcel E site. The EIR was completed and certified by the Soledad City Council on May 19, 2000 (State Clearinghouse No. 97121038). PUD 2018-02 was approved as a later activity within the scope of that EIR. The proposed amendment to PUD 2018-02 is similarly within the scope of the project analyzed in the EIR and thus requires no further analysis under 206
Resolution No. 6116
3. Exhibit A Parcel E PUD
2- Santa Clara Parcel E Amendment Application
CEQA Guidelines sections 15168 and 15162. The proposed project uses remain the same, and the increase in units will not result in any significant environmental impacts that were not previously evaluated and/or mitigated by the EIR.
Public Notice Requirements
A public notice was published on May 29, 2024, in The Californian.
Attachment(s):
207
RESOLUTION NO. 6116
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SOLEDAD APPROVING PLANNED UNIT DEVELOPMENT PERMIT NO. 2018-02 (PUD 2018-02) MIRAVALE PARCEL E AMENDMENT NO. 1
WHEREAS, in 2019, the City Council of the City of Soledad adopted Resolution No. 5482 approving of Planned Unit Development 2018-02 (PUD 2018-02), allowing for the establishment for 104 Single Family Units and 28 Multi-Family Units; and WHEREAS, the City of Soledad received an application initiated by Agha Development and Eden Housing (“Applicant”) for an amendment to PUD 2018-02 to increase the approved 28-unit apartment complex to 40 units and concessions/waivers that would allow the project to deviate from property development standards for Miravale II Santa Clara Parcel E ( the “Project”); and
WHEREAS, the Project is a collaboration with Agha Development and Eden Housing (collectively, “Applicant”); and
WHEREAS, the Applicant has submitted Amendment No.1 to, to modify the height, size, and configuration and increase the number of units for PUD 2018-02 with deviation from property development standards set forth in the R-3 Residential High-Density District. The proposed Amendment No. 1 will increase the number of multi-family units from 28 to 40, allow for elimination of 4 parking spaces for a total of 50 spaces, and allows for increasing the height of the multi-family units to 40 feet; and
WHEREAS, pursuant to California Environmental Quality Act (“CEQA”) Guidelines sections 15168 and 15162, Amendment No. 1 is within the scope of the certified EIR prepared for the Miravale Project. Amendment No. 1 does not involve new or more significant impacts than those already analyzed in the EIR or any new information that was not previously considered, and for purposes CEQA, no further documentation is required; and WHEREAS, the Planning Commission had a special meeting on May 22, 2024, and recommended approval on a 3-1 vote to determine that Amendment No.1 of PUD 2018-02 complies with all applicable City Ordinances, plans, codes, and standards; and WHEREAS, the City Council of the City of Soledad has determined that Amendment No.1 of PUD 2018-02, complies with all applicable City Ordinances, plans, codes, and standards.
THEREFORE, BE IT RESOLVED, that the City Council of the City of Soledad issue the requested concessions and waivers for height increase and off-street parking deviations and approve Amendment No. 1 to PUD 2018-02, based upon the findings and conditions set forth in the attached Exhibit “A” and made a part hereof, and based on the following findings:
1. The above recitals are true and correct and are incorporated herein.
2. Pursuant to CEQA Guidelines sections 15168 and 15162, Amendment No. 1 to PUD 2018-02 is within the scope of the certified EIR prepared for the Miravale Project. Amendment No. 1 does not involve new or more significant impacts than 208
those already analyzed in the EIR or any new information that was not previously considered, file and will be available for public review at the Soledad City Hall, Community, and Economic Development Department, and for CEQA compliance purposes, no further documentation is required.
3. The requested housing units of an additional 12 units based on the project’s provision of 64 deed-restricted units is consistent with the Soledad Municipal Code Chapter 17.14- R-3 Residential High Density regulations and is hereby granted.
4. The requested waiver allowing for a building height of 40 feet would allow the project to be constructed at the proposed density despite the 30-foot height limit.
5. The requested amendments to PUD 2018-02 comply with the provisions of Soledad Municipal Code section 17.38.230 and are consistent with the Soledad General Plan.
PASSED AND ADOPTED by the City Council of the City of Soledad at a regular meeting duly held on the 19th day of June 2024, by the following vote:
AYES, and in favor thereof Councilmembers:
NOES, Councilmembers:
ABSENT, Councilmembers:
ABSTAIN, Councilmembers:
ANNA M. VELAZQUEZ, Mayor
ATTEST:
MEGAN HUNTER, City Clerk
209
EXHIBIT A
PLANNED DEVELOPMENT PERMIT
CITY OF SOLEDAD
March 6, 2019 Reso No. 5482
APPROVAL DATE AND REFERENCE
______________________________
AMENDMENT NO. 1 APPROVAL DATE
AND REFERENCE
PD #2018-02
PERMIT NOS.
APN: APN 022-441-017
ASSESSOR’S PARCEL NO.
Planned Development Permit No. 2018-02 authorizing the Planned Development of 132 residential Units, and related access, parking, landscaping and appurtenant structures and improvements as shown on Exhibits B (A1-A14, L-1, C1-5) and dated 9/5/18, 12/31/18 and 2/13/19.
Planned Development Permit No. 2018-02 Amendment No. 1- authorizing the Planned Development of a total of 144 residential units, 104 Single-Family Townhomes, and 40 MultiFamily Apartment Units with a maximum height of 40 feet as shown on Exhibit C dated 3/28/2024.
FINDINGS:
Section 1: General Plan Consistency
A. The proposed project is consistent with the City of Soledad General Plan:
1. The project site is designated as “High Density Residential” on the General Plan Land Use Plan Map and the proposed project uses are consistent and within the allowable density range: General Plan and Zoning Ordinance, provisions 4-16 and Section 17.14.040, respectively. allow the development of up to 22 dwelling units per acre;
2. The project is consistent with the Circulation Element of the General Plan – the project site location has convenient and improved access from Santa Clara Street, improved public streets in the City of Soledad;
3. The project is consistent with General Plan policies promoting provision of safe and decent affordable multi-family housing; and
210
4. Conditions of approval require design adherence to appropriate Community Design Guideline and Standards, and the proposed site plan and buildings, as conditioned, have been found to be in substantial conformance with said provisions.
Section 2: Zoning Ordinance Consistency
A. The proposed use is consistent with the City of Soledad Zoning Ordinance:
1. The site is zoned R-3 (High-Density Multifamily Residential District) and the use and density ranges are consistent with the district standards for such.
2. The proposed site plan, as conditioned, would meet all of the site development requirements of the R-3 District and requested modifications to standards of the R-3 District are allowed through approval of the subject project as a Planned Development.
B. The establishment of the use on the site will not be detrimental to the health, safety, comfort, convenience, or general warfare of persons residing or working in the neighborhood, or detrimental to property and improvements in the neighborhood or to the general welfare of the city because:
1. The proposed project, as conditioned, is compatible with the surrounding mix of residential uses and will promote and further the achievement of community design standards for Multi-Family Residential Development;
2. The site has adequate services including water, sanitary sewer and storm drainage;
3. The subject project is located on a designated arterial street designed to accommodate the type of infill development as proposed and will have no significant effect in the area;
4. The facility has adequate on-site parking adequately screened from view of surrounding residential areas;
5. No nuisance-causing uses, or uses generating unusual noise, odor, light or vibration or otherwise detrimental to the neighborhood are authorized by this permit.
D. The proposed Planned Development Permit has been processed per the City's Zoning Ordinance requirements per Chapter 17.42 to wit:
1. An application has been received and accepted by the Planning Department for processing.
211
2. A Public Hearing Notice was published in the Salinas Valley Tribune on May 8th ,
2024 and public notices were mailed to all property owners within a 300-foot radius of the subject property. Hearing notices were posted at City Hall in accordance with the Government Code.
3. A duly noticed public hearing was held on May 22nd, 2024.
CONDITIONS OF APPROVAL
PD #2018-02
STANDARD CONDITIONS
1. TSM Expiration. The approved tentative subdivision map (Dated 2/13/19) shall expire twenty-four months after its approval or conditional approval. The expiration of the tentative map shall terminate all proceedings and no final map of all or any portion of the real property shall be filed without first processing a new tentative map. Extensions of time shall be considered pursuant to the City of Soledad Subdivision Ordinance and the State Subdivision Map Act.
2. Tentative Map Improvements Only Conceptual. The Project Developer agrees that the improvements shown on the tentative map are only conceptual, and that the final configuration of the improvements will be determined during review and approval of the final map, improvement plans, and supporting design calculations reviewed by the City, or other agents of the City, prior to recordation of the final map. All improvements as described in Chapter 16.24 of the Soledad Municipal Code, and as required by these conditions and any subsequent improvement agreement or development agreement, shall be designed and installed to the satisfaction of the City. With the exception of landscaping plans, all improvements shall be designed by a Civil Engineer licensed in the State of California. The City reserves the right to make changes to the Project to comply with public health and safety requirements and any Federal, State and local regulations and requirements.
3. Subdivision Improvement Agreement. The Project Developer shall enter into a subdivision improvement agreement with the City prior to approval of the final subdivision map for the Project. Said agreement shall set forth the necessary public service improvements to serve the proposed project, including grading, street improvements, temporary secondary access, water service, sewer service and storm drainage, refuse collection service, gas, electric, telephone and cable services, and any other necessary appurtenances and/or services, and shall include provisions requiring security for performance and materials and labor associated with said improvements in 212
accordance with Government Code Sections 66499-66499.10. All security shall be in the amount to cover 100 percent of the cost of such improvements, based on an engineer’s estimate provided to the City by the Project Developer, plus an amount necessary for the guarantee and warranty of the work for a period of one year following completion and acceptance of said improvements.
4. Conditions Run with the Land. The terms and conditions of this approval shall run with the land and shall be binding upon and be to the benefit of the heirs, legal representatives, successors, and assigns of the Permittee.
5. Applicability to Site. This use permit approval applies only to the physical site, structures and uses shown on the site plans and architectural drawings submitted by RRM Design Group dated 9/5/18, 12/31/18 and 2/13/19, attached hereto as Exhibit B, which are made a part of this permit except as may be modified by these conditions.
Notwithstanding this requirement, minor changes in site design and elevations from those shown on the approved site plan may be made, subject to review and approval of modified site plan by the City Community Development Director or designee.
6. Completion of Infrastructure Improvements. All infrastructure improvements required to serve the development pursuant to these conditions and City standards (e.g., streets, sidewalks, fire hydrant(s), storm drainage, sanitary sewer, water, undergrounding of gas, electric, telephone and cable, utilities, landscaping and other improvements and appurtenances) shall be designed and installed or constructed to the satisfaction of the City prior to the issuance of prior to the issuance of any building permit(s) or certificate of occupancy, as applicable. Landscaping shall be installed by the Project Developer and inspected and approved by the City and/or by a qualified person approved by the Public Works Director, prior to occupancy.
7. Offers of Dedication. Any offers of dedication, and bonding or other financial security, or development agreement(s) concerning same and as specified in the project conditions below shall be prepared by the Project Developer, and reviewed as to form, accuracy, and sufficiency by the City Attorney.
8. Compliance with Project Conditions. All project conditions as set forth herein shall be placed on the top sheet of building plan sets for all building construction on the project site. Unless otherwise provided for as a project condition to this use permit, all conditions must be completed to the satisfaction of the City prior to issuance of a certificate of occupancy and commencement of the activities allowed by this permit.
9. Code Compliance. All construction, improvements and uses shall be in accordance with zoning, building, fire, and all other codes and ordinances of the City of Soledad or agencies that have regulatory jurisdiction over the project. All such requirements shall be met and any outstanding fees paid prior to issuance of a certificate of occupancy, except for those items agreed to by the owner and the Building Official. 213
10. Grounds for Permit Revocation. Failure to establish the use authorized by this Permit within two years from the date of issuance, unless otherwise extended, shall be grounds for revocation of this Permit. Failure to comply with the conditions specified herein as the basis for approval of this application and issuance of this approval constitutes cause for the revocation of the Permit in accordance with the procedures set forth in the Soledad Municipal Code Section 17.42.070.
11. Cost Reimbursement. Project Developer shall reimburse the City of Soledad for all engineering, inspection, legal, and administrative expenses, incurred or to be incurred by the City in connection with this development, including expenses incurred through the use of outside consultants and additional inspectors, where necessary. At the time of submission of improvement plans for the project, the Project Developer shall enter into a Reimbursement Agreement and deposit not less than ten thousand dollars ($10,000) into a developer account set up by the City for the purpose of providing the City with said reimbursement. The City shall account to Project Developer for all expenses for which reimbursement is claimed, providing copies of all back-up materials in a timely manner, and shall return any portion of said deposit in excess of the actual amount of expenses incurred. If, in the judgment of the Public Works Director, it appears that the amount deposited shall not be sufficient to cover all expenses, Project Developer shall, within fifteen (15) days after written request from City, make an additional deposit of funds in an amount determined by the Director to be sufficient to make up the deficiency. At no time after submission of improvement plans shall the balance of the deposit fund be less than one thousand dollars ($1,000). The need for the maintenance of this account shall cease upon compliance with all project conditions and code requirements.
12. Hold Harmless and Indemnification. Applicant/Project Developer shall indemnify and hold harmless the City, its elective and appointive boards, commissions, officers, agents and employees from all damages, injuries, claims and any and all liability and costs arising from or about the site or in connection with the conduct of business thereon.
Applicant/Owner agrees to, and shall, defend City, its elective and appointive boards, commissions, officers, agents and employees, from any suits or actions at law or equity from damages caused, or alleged to have been caused, by reason of the aforesaid design, construction and uses of the involved site pursuant to this Use Permit. Except as provided above, the terms of this paragraph shall apply to all damages and claims for damages of every kind suffered, or alleged to have been suffered, by reason of the aforesaid design or operations referred to herein, regardless of whether or not City has prepared, supplied or approved of plans and or specifications for use of the proposed site.
To the extent that Applicant is required to indemnify and hold harmless the parties listed above, it shall have the right to control the litigation, including but not limited to contracting for counsel of its choice, and accepting or rejecting any settlement offer.
PROECT SPECIFIC CONDITIONS
13. Affordability Covenants. Developer shall enter into an Affordable Housing Agreement, approved by the City Council that shall require either 1) that 29% of the total project units are available to very low and low income household; and, 25% of the total units are 214
available to moderate income residents or 2) that the applicant and City Council mutually agree on alternative terms. Such documents enforcing this condition shall be recorded and in full force upon the property prior to the issuance of a Building Permit. Prior to issuance of the certificate of occupancy, the Project Developer shall demonstrate compliance with the Affordable Housing Agreement as required per Soledad Municipal Code Section 17.41.
14. Architectural Design Approval. (a) Prior to issuance of a Building Permit for the proposed project, Project Developer shall submit revised building elevations, site plan and landscape plans as may be required by the Planning Commission. Revised plans shall be generally consistent with Plans dated September 5, 2018, March 28, 2024 and shall demonstrate conformance with applicable provisions of Community Design Guidelines and Standards Design Standards contained in Chapter 6 of the Guidelines. (b) Incorporate Design Details in Building Plans. Construction drawings submitted for building permit approval shall include architectural elevations with the design detail noted on the elevation sketches included as part of Exhibit B and Exhibit C as modified by these conditions. Drawings shall show all proposed exterior lighting fixtures. A building permit application will not be accepted by the City unless building plans include a site plan and elevations with sufficient design detail for review and approval by the City Building Official and/or Public Works Director (or Designee).
15. Minor Architectural Changes. Following Architectural Design Approval by the Planning Commission, minor site plan or architectural changes may be approved by the Community & Economic Development Director or designee.
16. Final Landscaping Plan Required. Prior to issuance of the first building permit, Project Developer shall submit a final landscape plan for review and approval by the Public Works Director or Designee. Final landscape plan shall provide for and identify durable play area improvements and corresponding specifications. Landscaping and irrigation shall be installed prior to occupancy in compliance with the provisions of Chapter 15.10 of the Soledad Municipal Code (SMC).
17. Encroachment Permit and Right-of-Way Improvements. An encroachment permit shall be obtained from the City for any construction work that will be performed within the public right-of-way, and a contractor licensed in the State of California shall be responsible for construction of any such future work. Any improvements in the public right of way shall be designed by a Civil Engineer licensed in the State of California and installed to the satisfaction of the Public Works Director or City Engineer.
18. Engineering Studies/Calculations. All engineering design work, including, but not limited to, design of storm sewers and appurtenances, sanitary sewers and appurtenances, storm drainage facilities, and water systems and appurtenances; street improvements and sidewalks, including geometrics, sight distances, lighting, retaining walls, signing and striping; and landscape irrigation and appurtenances, shall be supported by applicable engineering studies/calculations completed by a licensed civil engineer or qualified 215
licensed professional in the State of California, subject to the review and approval of the City.
19. Improvement Plans. Project Developer shall complete all offsite and onsite improvement plans consistent with these conditions and City requirements, and said plans shall be approved by the City prior to issuance of building permits.
20. Required Onsite/Offsite Improvements. Proposed onsite and off-site improvements shall be constructed in conformance with applicable City of Soledad Design Standards and Specifications to the satisfaction of the Public Works Director and as further stipulated herein:
(a) Storm Water Management. In accordance with the provisions of Chapter 13.52 of the Soledad Municipal Code, a storm water permit shall be obtained prior to the issuance of any grading or building permit for the project. The proposed project shall comply with the most recent Phase II Municipal Separate Storm Sewer System (MS4) General Permit (Order No. 2013-0001-DWQ) and the PostConstruction Stormwater Management Requirements for Developments Projects in the Central Coast Region (Resolution No.
R3-2013-0032).
Due to the project type and size for development, a Storm Water Pollution Prevention Plan (SWPPP) will need to be prepared and proper documentation submitted to the State Water Board to register under the Construction General Permit. This will cover the full development site so another SWPPP will not need to be required for Phase 2 Development.
The applicant is required to provide a Waste Discharge Identification (WDID) number prior to issuance of a grading permit.
A Stormwater Control Plan (SCP) shall be prepared to document the PostConstruction Stormwater Control Measures (SCMs). The SCP must include an Operation and Maintenance (O&M) Plan that addresses the maintenance procedures and intervals for each SCM and identifies the responsible party to conduct maintenance. A maintenance covenant will be required to ensure on-going maintenance for the life of the facility. The covenant shall include, at a minimum:
- The project owner’s signed statement accepting responsibility for the O&M of the installed onsite and/or offsite structural treatment and flow control SCMs until such responsibility is legally transferred to another entity; and either
- Written conditions in the sales or lease agreements or deed for the project that require the buyer or lessee to assume responsibility for the O&M of the onsite and/or offsite structural treatment and flow control SCM until such responsibility is legally transferred to another entity; or 216
- Any other legally enforceable agreement or mechanism, such as recordation in the property deed, that assigns responsibility for the O&M of the onsite and/or offsite structural treatment and flow control SCM to the project owner(s) or the City.
The proposed project must be designed to not increase the peak flow to the downstream system. Therefore, a drainage report will need to be prepared demonstrating compliance. Refer to the City’s Design Standards and Standard Specifications for the specific flood control requirements.
During construction, the Project Developer shall conform to the City’s pollution prevention requirements for construction contracts, including but not limited to, proper clean-up and disposal of spills, regular maintenance of all construction vehicles and heavy equipment, and proper storage of stockpiled materials, chemicals, paints, etc.
b. Storm Drainage Improvements. Project Developer shall prepare and implement a storm drainage improvement plan supported by storm drain calculations, consistent with the requirements of the 2008 Public Works Design Standards and Chapter 13.52 of the Soledad Municipal Code—Storm Water Quality. All drainage improvements shall be constructed consistent with the improvement plan as approved by the City, and Project Developer shall be responsible for the continued maintenance of onsite drainage facilities consistent with the Soledad Municipal Code.
c. Water Mains and Appurtenances. Project Developer shall construct adequate onsite water system improvements for commercial, fire and landscape irrigation purposes in
accordance with Public Works Design Standards and Fire Code fire flow requirements. The water system shall be looped and water meters clustered wherever possible on-site to serve each use. Back-flow preventers on the State Approved List shall be installed where required by the City Engineer.
d. Sanitary Sewer Improvements. Project Developer shall construct the necessary connections to the existing sanitary sewer system within the project frontages in accordance with the Public Works Design Standards. In addition, a clean-out shall be installed at the street right-of-way for each connection to the City’s sewer mains.
19. Construction Dust Control. Project Developer shall prepare a Dust Emissions Control Plan for review and approval by the City prior to issuance of any grading or building permit. Dust emission control measures shall be included in the contractor work specifications that are reviewed and approved by the City and shall include the following:
217
• Watering all active construction areas and areas of disturbed soils at least twice daily and more frequently during periods of high winds exceeding 15 miles per hour; • Suspension of all grading operations during periods of high wind speeds if watering activities are inadequate to control airborne dust as may be determined onsite by the City Engineer;
• Covering material storage piles if inactive for more than 72 consecutive hours; • Covering all loose materials transported off-site, or requiring trucks to maintain at least two-feet of freeboard and watering all loose materials; • Applying non-toxic binders to previously graded portions of the site if inactive for fourteen days or longer; and
• Water sweeping adjacent public streets at the end of each day –water sweepers shall vacuum excess water to avoid runoff-related degradation of water quality.
20. Archaeological Resources/Human Remains. Should human remains or any archeological artifacts be discovered during project implementation, further disturbance of the project site shall cease until the Monterey County Coroner and/or, the Native American Heritage Commission is contacted. When Native American archaeological, ethnographic, or spiritual resources are involved, all identification and treatment shall be conducted by qualified archaeologists and appropriate Native American representatives.
In the event that no such Native American is available, persons who represent tribal governments and/or organizations in the locale in which resources could be affected shall be consulted. Upon recommendation of a qualified archaeologist, appropriate mitigation measures shall be implemented at Project Developer’s expense.
21. Hazardous Materials. In the event that subsurface structures are encountered during the development of the site, caution should be exercised in determining whether or not these structures contain hazardous substances, and, where there is any uncertainty, the Monterey County Department Division of Environmental Health shall be contacted for assistance. If they contain any hazardous material(s), they should be removed, handled, transported, and disposed of in accordance with the applicable local, state, and federal guidelines.
22. Construction Hours. All construction and construction preparation activities, including refueling, equipment repairs and vehicle, machinery and equipment warm-ups, shall be limited to the following hours and days:
Between the hours of 7:00 a.m. and 7:30 p.m. weekdays,
Between the hours of 8:00 a.m. and 7:00 p.m. on Saturdays, Prohibited on Sundays and all City-approved holidays unless written permission is received from the City Manager.
23. Impact Mitigation Fees and Funding of Public Improvements Maintenance. Project Developer shall pay all water, sanitary sewer, storm drain, park, public safety, general government, local and regional (TAMC) transportation impact fees in accordance with established fees set by ordinance and resolution and based upon the date of building permit application filing.
218
24. Recycling and Trash Enclosures. Containers for both garbage and recyclable materials shall be provided and trash enclosures shall be of adequate size to accommodate both.
Prior to issuance of the first building permit, Project Developer shall submit to the City written confirmation from the Salinas Valley Solid Waste Disposal Authority verifying the adequacy of these facilities.
25. Bicycle Facilities Required. Secure bicycle parking racks shall be provided at the rate of one bicycle parking rack per five off-street parking spaces and specifications for such shall be shown on final plans.
26. Fencing and Walls. Project Developer shall construct a masonry wall along the eastern boundary of the project starting and ending at the ends of the existing walls along Bryant Canyon Road to the south of the site. This shall be done in a manner that prohibits any access from these streets onto Bryant Canyon Road. The specifications of the barrier shall conform to the existing masonry walls installed to the south.
27. Geotechnical Investigation. All site preparation and construction recommendations identified in the geotechnical investigation report completed for the project site, and any supplements thereto, shall be incorporated into improvement plans for the proposed project and shall be reviewed and approved by the City or designated agent of the City prior to recordation of the final subdivision map.
28. Geotechnical Engineer On-Site Monitoring. A qualified professional geotechnical engineer shall perform on-site monitoring of all grading and excavation activities on the project site. Evidence of an agreement with a geotechnical engineer shall be submitted for review and approval of the City prior to commencement of any grading activities or any underground work. Prior to issuance of building permits, the geotechnical engineer shall submit evidence that grading and excavation were performed consistent with the recommendations of the geotechnical investigation.
29. Street Frontage Improvements. (a) The Project Developer shall be responsible for constructing any improvements to Santa Clara Street along the project frontage needed to accommodate project traffic.
30. Fire Hydrants. Project Developer shall install fire hydrants on internal project streets and, if required, on Santa Clara Street per City specifications and in accordance with the requirements of the Uniform Fire Code and as approved by the City. All hydrants shall be painted “Neon Grass” and all visible components between the fire hydrant and fire hydrant concrete pad shall be painted flat black, unless otherwise directed by the City.
31. Automatic Sprinklers. All town homes in the subdivision shall be equipped with automatic fire sprinkler systems per the specifications of the Uniform Fire Code; and the design and installation of such shall be approved by the City. 219
32. On-Site Street Improvements and Guest Parking. (a) Project Developer shall be responsible for constructing all onsite private street improvements in accordance with the approved Final Map and improvement plans.
(b) All street and sidewalk improvements shall conform with the requirements of the Americans with Disabilities Act, including, but not limited to, sidewalks crossing town home driveways, pedestrian access to and ADA parking alongside mail box facility, etc. (c) Parking shall be allowed only in designated parking areas for both Single-Family and Multi-Family units. For Multi-Family units, the project is subject to 50 parking stalls and shall be shown on the final site plan. Street curbs/sides throughout the project shall be stained “safety red” and stamped “No Parking-Fire Lane” on top. “No Parking Fire Lane” signs shall also be posted at various locations throughout the project. (d) A turning radii analysis showing adequate available space to perform the required turning movements for emergency vehicles shall be shown on the final improvement plan submittals and shall be approved by the City.
33. Deed Restrictions. Project Developer shall prepare a Declaration of Covenants, Conditions and Restrictions (CC&Rs) for all units within the proposed project which shall be reviewed and approved by the City staff and recorded against each residential unit on the project prior to the sale of any lot. The CC&R’s shall include a provision requiring review and approval by the City prior to any future revisions.
34. Homeowners Association. (a) The Project Developer shall establish a homeowner association for maintenance of project site common areas and improvements thereto. The homeowners association shall be responsible for maintenance and operation of all amenities of benefit to the future residents of the project site, including but not limited to: common on-site landscaping and common open space, including landscaped setback along Santa Clara Street, and appurtenant irrigation systems; onsite fences and walls and retaining walls maintenance, including graffiti removal, painting, repairs and replacement thereof; onsite street lights and lighting costs, street sweeping, striping and repairs thereof; electric current; storm drain lines cleaning, repair and replacement thereof; supervision of all necessary repairs and replacement; debris removal; and any and all other items of work necessary and incidental for the proper maintenance, operation thereof, and administration (including required annual storm water monitoring and reporting). (b) The homeowners association and governing CC & R’s shall be established prior to recordation of the final subdivision map for the proposed project and shall be reviewed and approved by the City.
35. Fire Lane Maintenance, Parking and CC & R’s. Fire lanes shall be re-stained and tops of curbs remarked, as necessary, but no less frequently than once every five (5) years. All “Fire Lane-No Parking” signs shall be replaced when damaged or removed when they fade. These provisions shall be included in the project Covenants, Conditions & Restrictions (CC & R’s). The project’s CC & R’s shall also include provisions limiting permanent onsite parking by project residents to the two spaces provided on each 220
lot, limiting the duration of guest parking, prohibiting the conversion of garages for storage purposes or uses other than vehicle parking, prohibiting parking of recreational vehicles and boat trailers onsite, and providing for removal of vehicles parked in violation of the project’s CC & R’s. The project’s CC&R’s shall further prohibit the placement of any structure, permanent or portable, within the street right-of-way which impedes the use of or access to project sidewalks and streets.
36. Improvement Assessment District. If requested by the Project Developer, an improvement assessment district shall be formed by the City, to fund the provision, maintenance and/or operation of public improvements required to be provided to serve the project. Mutual agreement shall reached by the Project Developer, and the City, as to the improvements to be included and those improvements shall be deemed eligible in accordance with all applicable laws.
I hereby declare under penalty of perjury that I have read the foregoing conditions and that they are, in fact, the conditions which were imposed upon the granting of this permit. I agree to abide fully by these conditions.
Applicant Signature Date
NOTE: Issuance of this Permit does not waive obtaining any applicable Building Permits before starting construction or initiating the use, nor does it waive any other applicable requirements of law.
Community Development Director Date
221
REF
DW
UP
PANTRY
155 SF
Kitchen/Dining
444 SF
Garage
25 SF
Pdr
209 SF
Living Room
2' - 0" 23' - 9" 18' - 3"
44' - 0"44' - 0"
12' - 8" 11' - 4"
21 SF
Entry
R T
38' - 7" 3' - 5"
42' - 0"
444 SF
Garage
N:\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\Alley\Alley Plan 1.rvt 8/30/2018 4:56:58 PM
0047-09-R
1/4" = 1'-0" 1 GROUND FLOOR PLAN1/4"
2 SEC
1/4" = 1'-0" 3
GROUND FLOOR PLAN_SIDE GARAGE
OPTION
PLAN 1 - AREAS
GROUND FLOOR 511 SF
SECOND FLOOR 879 SF
1,390 SF
UP
DW
REF
425 SF
Garage
123 SF
Kitchen
192 SF
Living
146 SF
Dining Room
27 SF
Pwdr.
14 SF
CL.
30 SF
ENTRY
LINE OF WALL
ABOVE
16' - 0" 30' - 0"
46' - 0"
44' - 0" 2' - 0"
46' - 0"
10' - 0" 14' - 0"
24' - 0"
R T
134 SF
Bed 2
219 SF
Loft
70 SF
M. BATH
OPEN TO BELOW
ROOF BELOW
10' - 0"
24' -
44' - 0" 2' - 0"
46' - 0"
N:\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\Alley\Alley Plan 2.rvt 8/29/2018 5:51:31 PM
0047-09-R
1/4" = 1'-0" 1 GROUND FLOOR PLAN1/4" = 1'-0" 2 SECOND FLOOR PLAN PLAN 2 - AREAS
GROUND FLOOR 586 SF
SECOND FLOOR 930 SF
1,516 SF
D
W
REF
UP
51 SF
WIC
135 SF
Hall
53 SF
Bath
17 SF
Ldr
38' - 0"
L
9' - 0"
14' - 11" 18' - 1" 5' - 0"
5' - 0" 21' -
420 SF
Garage
144 SF
Kitchen
44 SF
Entry
107 SF
Dining
38' - 0"
35' - 0"
5' - 0" 21' - 0" 9' - 0"
133 SF
Living
21' - 6" 16' - 6"
27 SF
PDR.
8 SF
CL. L
14' - 11" 18' - 1" 5' - 0"
9' - 0" 26' - 0"
38' - 0"
35' - 0"
N:\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\AutoCourt\Court_Plan 3.rvt 8/29/2018 6:20:06 PM
0047-09-R
1/4" = 1'-0" 2 SECOND FLOOR PLAN1/4" = 1'-0" 1 GROUND FLOOR PLAN PLAN 3 - AREAS
GROUND FLOOR 537 SF
SECOND FLOOR 920 SF
1,457 SF
UP
REF
DW
UP
10' - 4" 26' - 4" 2' - 4"
39' - 0"
88 SF
Dining
422 SF
Garage
7 SF
CC
146 SF
Kitchen 231 SF
Living
61 SF
Entry
10' - 4" 28' - 8"
25' - 7" 5' - 5"
8' - 2" 30' - 10"
9' - 1" 21' - 11"
31' - 0"
39' - 0"
31' - 0"
39' - 0"
21 SF
PDR.
88 SF
Dining
422 SF
Garage
7 SF
CC
61 SF
Entry
P
21 SF
PDR.
N:\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\AutoCourt\Court_Plan 4.rvt 8/29/2018 6:24:51 PM
0047-09-R
1/4" = 1
2 SECON
1/4" = 1'-0" 1 GROUND FLOOR PLAN
PLAN 4 - AREAS
GROUND FLOOR 609 SF
SECOND FLOOR 970 SF
1,578 SF
1/4" = 1'-0" 3 OPTIONAL AUTO COURT ENTRY
MIRAVALE PARCEL E A1
# 0047-09-RS18
February 27, 2019
1/8” = 1’-0” (24X36 SHEET)
0 4 8 16
0 8 16 32
TITLE SHEET 1/16” = 1’-0” (12X18 SHEET)
MIRAVALE PARCEL E
PROJECT DIRECTORY
OWNER: NADER AGHA
449 ALVARADO
MONTEREY, CA 93940
ARCHITECT: RRM DESIGN GROUP
3765 S. HIGUERA STREET, SUITE 102
SAN LUIS OBISPO, CA 93401
CONTACT: RANDY RUSSUM
PHONE: (805)-543-1794
EMAIL: [email protected]
CIVIL RRM DESIGN GROUP
3765 S. HIGUERA STREET, SUITE 102
SAN LUIS OBISPO, CA 93401
CONTACT: ROBERT CAMACHO
PHONE: (805)-543-1794
EMAIL: [email protected]
LANDSCAPE RRM DESIGN GROUP
3765 S. HIGUERA STREET, SUITE 102
SAN LUIS OBISPO, CA 93401
CONTACT: WES AROLA
PHONE: (805)-543-1794
EMAIL: [email protected]
APN: 22-441-017-000
PROJECT DESCRIPTION
THIS PROJECT CONTAINS BOTH SINGLE-FAMILY AND MULTI-FAMILY RESIDENTIAL BUILDINGS CONSISTING OF 130 UNITS, INCLUDING:
(50) TOTAL ALLEY PLANS
(54) TOTAL AUTOCOURT PLANS
(TWO 6-PACK LAYOUTS; TEN 4-PACKS)
SITE AMENITIES INCLUDE OUTDOOR WALKING AND RECREATION PATHS,
A FITNESSCIRCUIT, DOG RUN AND PLAY AREA, COMMUNITY GARDENS, AND OUTDOOR BBQ AND PICNIC AREAS.
AFFORDABLE HOUSING
DENSITY BONUS
THE PROJECT IS REQUESTING A DENSITY BONUS AND INCENTIVES AS DEFINED IN THE CITY OF SOLEDAD MUNICIPAL CODE, CHAPTER 17.39 AND THE STATE OF CALIFORNIA GOVERNMENT CODE SECTION 65915.
THESE INCLUDE: REDUCED MINIMUM LOT SIZES AND REDUCED REQUIRED
SETBACKS IN ORDER TO ACCOMODATE SMALL LOT SINGLE FAMILY THAT OFFSETS THE NEEDED AFFORDABLE HOUSING.
VICINITY MAP PROJECT STATISTICS BUILDING AREAS ANALYSIS SHEET INDEX ZONING R-3 HIGH DENSITY RESIDENTIAL
PARCEL SIZE: 8.556 ACRES
(372,738 SF)
MAX LOT COVERAGE: 60% (223,643 SF)
PROPOSED COVERAGE: 34% (126,350 SF)
DENSITY ALLOWED 16/ACRE (22/ACRE WITH CUP)
=136 UNITS (188 UNITS)
DENSITY PROPOSED 15 UNITS/ACRE = 130 UNITS
LOT COVERAGE ALLOWED PROPOSED
60% 34%
372,738 SF X 60% 372,738 SF X 34%
= 223,642 SF = 126,350 SF
MAX. ALLOWED HEIGHT: 2-STORIES/ 30 FT.
MAX. PROPOSED HEIGHT: 2-STORIES/25’-5.5”
SETBACKS ALLOWED PROPOSED
FRONT 15 10
SIDE 5 4
REAR 15 5
PORCH -- 6’ 6”
COMMUNITY OPEN SPACE SETBACK EXCEPTIONS
FRONT -- 8
PORCH -- 4’ 6”
PARKING
PER MUNICIPAL CODE TABLE 17.36.20
REQUIRED SF:
2 COVERED SPACES/UNIT 104 X 2 = 208
.25 GUEST SPACES/UNIT 104 X .25 = 26
= 234 SPACES
MF:
2 SPACES/UNIT 26 X 2 = 52 SPACES
PROVIDED SF:
2 GARAGE SPACES/UNIT
PARALLEL STREET PARKING
MF:
2 SPACES/UNIT
2 ADA SPACES
104 X 2 = 208 SPACES
29 SPACES
= 237 SPACES
26 X 2 = 52 SPACES
= 54 SPACES
A1 TITLE SHEET
A2 SITE CONTEXT PHOTOS
A3 ARCHITECTURAL SITE PLAN
A4 TYPICAL MOTOR-COURT SITE LAYOUTS
A5 TYPICAL ALLEY SITE LAYOUTS
L1 LANDSCAPE SITE PLAN
C1 EXISTING SITE SURVEY
C2 PROPOSED SUBDIVISION
C3 CIVIL UTILITY PLAN
C4 GRADING/DRAINAGE PLAN
C5 GRADING/DRAINAGE PLAN
C6 STORMWATER MANAGEMENT PLAN
A6 FLOOR PLAN ALLEY PLAN 1
A7 ELEVATIONS ALLEY PLAN 1_STYLE 1
A8 ELEVATIONS ALLEY PLAN 1_STYLE 2
A9 ELEVATIONS ALLEY PLAN 1_STYLE 3
A10 ELEVATIONS ALLEY PLAN 1_STYLE 4
A11 FLOOR PLAN ALLEY PLAN 2
A12 ELEVATIONS ALLEY PLAN 2_STYLE 1
A13 ELEVATIONS ALLEY PLAN 2_STYLE 2
A14 ELEVATIONS ALLEY PLAN 2_STYLE 3
A15 ELEVATIONS ALLEY PLAN 2_STYLE 4
A16 FLOOR PLAN COURT PLAN 3
A17 ELEVATIONS COURT PLAN 3_STYLE 1
A18 ELEVATIONS COURT PLAN 3_STYLE 2
A19 ELEVATIONS COURT PLAN 3_STYLE 3
A20 FLOOR PLAN COURT PLAN 4
A21 ELEVATIONS COURT PLAN 4_STYLE 1
A22 ELEVATIONS COURT PLAN 4_STYLE 2
A23 ELEVATIONS COURT PLAN 4_STYLE 3
A24 STREET ELEVATION
A25 COLOR AND MATERIALS
A26 APARTMENT UNIT PLANS
A27 APARTMENT BUILDING 1 PLAN
A28 APARTMENT BUILDING 1 ELEVATION
A29 APARTMENT BUILDING 2 PLAN
A30 APARTMENT BUILDING 2 ELEVATION
A31 CHARACTER VIGNETTES
A32 CHARACTER VIGNETTES
A33 CHARACTER VIGNETTES
MULTIFAMILY UNITS - AREAS
2 BED UNIT 727 SF
3 BED UNIT B 1007 SF
3 BED UNIT A 1002 SF
222
7. Santa Barbara Park off Santa Barbara St.
6. Peverini Park off San Fernando and Vida St.
8. Single Family resisdences on San Rafael St.
2. Neighboring Single Family residences across from Lot
1. Santa Clara St. Looking at Site Lot
4. Dolores Ct. Single Family residences off of Santa Clara St.
3. Orchard Ln. looking down Santa Clara St. toward Lot
5. School on corner of San Antonio St. and Orchard Ln. 9. Neighboring Single Family residences on San Antonio St.
10. Single Family residences on Vista Ave.
4 1
2 3
8 7
6 5
9 10
MIRAVALE PARCEL E A2
# 0047-09-RS18
February 27, 2019
1/8” = 1’-0” (24X36 SHEET) 0 4 8 16 0 8 16 32
SITE CONTEXT PHOTOS 1/16” = 1’-0” (12X18 SHEET)
223
300
295
290
290
285
18' 18' 18' 18' 18' 18' 18'
18'
18' 22' 18' 22' 18'
22' 18' 22'
18' 18' 20'
MAILBOX
TYPE 2
PRC =
9+67.27
PT =
14+11.94
3+62.90 4+00 5+00
6+00
7+00
8+00
9+00
10+00
11+00
12+00 13+00
14+00
0+00
14+20
SANTA CLARA
BOX
PG&E
BOXES
WATER
BOX
WATER
305
300
290
305
300
295
290
285
300
UP
UP
30' - 0"
R 20' - 0"
S
E
T
B
A
C
K
5' - 0"
R 15' -
0"
R 15' - 0"
2 0' - 0"
26' - 0"
30' - 3"
11' - 0" 11' - 0"
8' - 0"
6' - 0"
PLAN 1
FIRELANE
TR
5 10
ADA
24 41 47
54 ADA
2 3B
2 3B
2 2
2 2
3A
3B
3A
3B
3A
N:\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\0047-09_Parcel E_SITE.rvt 2/27/2019 1:58:10 PM
0047-09-RS18 - MIRAVALE PARCEL E A1
SCHEMATIC SITE PLAN
1" = 40'-0" 1 SCHEMATIC SITE PLAN
UNIT COUNT
AUTO COURT UNITS - 54
ALLEY LOADED UNITS - 50
APARTMENT UNITS - 26 (12 x 2 bed + 14 x 3 bed)
PARKING COUNT
AUTO COURT UNITS - 108 GARAGE SPACES (2/unit)
ALLEY LOADED UNITS - 110 GARAGE SPACES (2/unit)
APARTMENT UNITS - 52 STANDARD SPACES (2/unit) + 2 ADA SPACES PARALLEL PARKING - 29 SPACES
MIRAVALE PARCEL E A3
# 0047-09-RS18 ARCHITECTURAL SITE PLAN February 27, 2019 ARCHITECTURAL SITE PLAN 1 1" =40’ - 0” (24 X 36 SHEET)
ARCHITECTURAL SITE SECTION 1 1" =20’ - 0” (24 X 36 SHEET) 1” = 40’-0” (24X36 SHEET)
0 20 40 80
0 40 80 160
1” = 80’-0” (12X18 SHEET)
LOT
47' - 0"
LOT
53' - 0"
R.O.W.
36' - 0"
OBTUSE ANGLE ACROSS LOT
43' - 9"
OBTUSE ANGLE ACROSS LOT
71' - 5"
OBTUSE ANGLE ACROSS LOT
87' - 4"
36' ROW WITH
ROLLED CURBS
AND SIDEWALK
FRONT
YARD
SIDE
YARD
COMMUNITY
OPEN SPACE 20' WIDE ALLEY
SANTA CLARA
STREET
PROPERTY LINE
PROPERTY LINE
PL. PL. PL.
ALLEY
PLAN 2 ALLEY
PLAN 2
COURT
PLAN 3
COURT
PLAN 4 ALLEY
PLAN 1
ALLEY
PLAN 2
FRONT
YARD
PL.
ROLLED CURB
1' - 0"
AISLE
11' - 0"
AISLE
11' - 0"
PARKING
8' - 0"
SIDEWALK
5' - 0"
PL.
224
MIRAVALE PARCEL E A4
# 0047-09-RS18
February 27, 2019
1/8” = 1’-0” (24X36 SHEET)
0 4 8 16
0 8 16 32
TYPICAL MOTOR-COURT SITE LAYOUTS 1/16” = 1’-0” (12X18 SHEET)
REF REF
REF
DW
REF
DW
47' - 0" 53' - 0"
50' - 0" 50' - 0"
47' - 0" 53' - 0"
50' - 0" 50' - 0"
Entry
44 SF
Garage
420 SF
Entry
44 SF
Dining
107 SF
Garage
420 SF
Dining
88 SF
Garage
422 SF
Dining
88 SF
Garage
422 SF
COURT PLAN 3
COURT PLAN 3
REVERSED
COURT PLAN 4 COURT PLAN 4
REVERSED
CC
7 SF
Living
133 SF
Living
133 SF
Kitchen
144 SF
4' - 0"
5' - 0"
4' - 0" 4' - 0"
28' - 0"
Kitchen
144 SF
Dining
107 SF
4' - 0"
5' - 0"
5' - 0" 5' - 0"
PDR. 27 SF
PDR. 27 SF
4' - 0" 4' - 0"
Kitchen
146 SF Living
231 SF
Entry
61 SF
CC
7 SF Kitchen
146 SF
Living
231 SF
Entry
61 SF
10' - 0"10' - 0"
5' - 0" 5' - 0"
20' - 0"
BACKYARD AREA
19'X10'
PDR. 21 SF
BACKYARD AREA
19'X10'
BACKYARD AREA
14' 6" X14' 4"
BACKYARD AREA
14' 6" X14' 4"
REAR
SETBACK
SIDE
SETBACK
SIDE SETBACK
REAR
SETBACK
FRONT SETBACKFRONT SETBACK
SIDE
SETBACK
REAR
SETBACK
REAR
SETBACK
SIDE SETBACK
STREET SIDE
?
?
Bed 2
114 SF
M. Bed
196 SF
WIC
51 SF
M. Bath
91 SF
Hall
135 SF
Bath
53 SF
Ldr
17 SF
?
?
Bed 2
114 SF
M. Bed
196 SF
WIC
51 SF
M. Bath
91 SF
Hall
135 SF
?
? ?
?
M. Bed
213 SF
Bed 2
134 SF
Bed 3
131 SF
M. Bath
92 SF
WIC
50 SF
?
?
Bath
74 SF
Loft
190 SF
M. Bed
213 SF
Bed 2
134 SF
Bed 3
131 SF
M. Bath
92 SF
WIC
50 SF
Ldr
18 SF
Bath
74 SF
Loft
190 SF
Bed 3
130 SF
L
ROOF BELOW ROOF BELOW
ROOF
BELOW
ROOF
BELOW
ROOF BELOW ROOF BELOW
N:\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\0047-09_Pack Layouts.rvt 8/31/2018 9:16:47 AM
0047-09-RS18 - MIRAVALE PARCEL E A2
4-PACK SCHEMATIC LOT
1/8" = 1'-0" 1 GROUND FLOOR PLAN1/8" = 1'-0" 2 SECOND FLOOR PLAN REF
REF
DW
REF
DW
REF
REF
DW
REF
56' - 0" 44' - 0"
56' - 0" 47' - 0"
47' - 0"47' - 0"
47' - 0" 25' - 0" 24' - 0" 7' - 0"
20' - 0"
50' - 0" 50' - 0"
Entry
44 SF
Living
133 SF
Dining
107 SF
Kitchen
144 SF
Garage
420 SF
Dining
88 SF
Garage
422 SF
Kitchen/Dining
155 SF
Garage
444 SF
Pdr
25 SF
Living
133 SF
Dining
107 SF
Kitchen
144 SF
Garage
420 SF
COURT PLAN 3 COURT PLAN 3
REVERSED
COURT PLAN 4
COURT PLAN 3
REVERSED
ALLEY PLAN 1
SIDE GARAGE
Entry
44 SF
Living Room
209 SF
Dining
88 SF
Garage
422 SF
4' - 0"
5' - 0"
PDR. 27 SF
5' - 0"
4' - 0" 4' - 0"
PDR. 27 SF
5' - 0"
4' - 0"
5' - 0"
4' - 0" 4' - 0"
COURT PLAN 4
REVERSED
5' - 0"
4' - 0" 4' - 0"
5' - 0"
14' - 0"
20' - 0"
4' - 0"
5' - 0"
9' - 0"
4' - 0" 4' - 0"
8' - 0"
10' - 0"
5' - 0"
Kitchen
146 SF
Living
231 SF
Entry
61 SF
Garage
420 SF
Dining
107 SF
Kitchen
144 SF
Living
133 SF
Entry
44 SF
PDR. 27 SF
Entry
21 SF
YARD SPACE
19' X 10'
BACKYARD SPACE
19' X 10'
BACKYARD SPACE
14' X 14' 6"
YARD SPACE
14' X 14' 6"
BACKYARD SPACE
14' X 19'
BACKYARD SPACE
22' X 9'
Kitchen
146 SF
Living
231 SF
Entry
61 SF
SIDE
SETBACK
SIDE
SETBACK
REAR
SETBACK
SIDE SETBACK
REAR
SETBACK
REAR
SETBACK
FRONT
SETBACK
EXCEPTION
REAR
SETBACK
SIDE
SETBACK
REAR
SETBACK
SIDE
SETBACK
SIDE SETBACK
SIDE
SETBACK
5' - 0"
SIDE
SETBACK
STREET SIDE
4' - 6"
PORCH
SETBACK
EXCEPTION
FRONT
SETBACK
5' - 0"
REAR
SETBACK
5' - 0"
10' - 0"
15' - 0"
SIDE
SETBACK
N:\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\0047-09_Pack Layouts.rvt 8/31/2018 9:16:10 AM
1/8" = 1'-0" 1 GROUND FLOOR PLAN
TYPICAL 4-PACK SITE PLAN 1 1/8" = 1'-0" (24 X 36 SHEET) TYPICAL 6-PACK SITE PLAN 2 1/8" = 1'-0" (24 X 36 SHEET) 225
MIRAVALE PARCEL E A5
# 0047-09-RS18
February 27, 2019
1/8” = 1’-0” (24X36 SHEET)
0 4 8 16
0 8 16 32
TYPICAL ALLEY SITE LAYOUTS 1/16” = 1’-0” (12X18 SHEET) DW REF REF
DW
REF
DW
DW
REF
REF
DW
REF
DW
Garage
425 SF
Kitchen/Dining
155 SF
Garage
444 SF
Pdr
25 SF
ALLEY PLAN 1
ALLEY PLAN 2
Living Room
209 SF
Living
192 SF
Dining Room
146 SF
Kitchen
123 SF
Pwdr. 27 SF
10' - 0"
FRONT
SETBACK
4' - 0" 4' - 0" 4' - 0"
SIDE
SETBACK
SIDE
SETBACK
4' - 0" 4' - 0"
13' - 0" 13' - 0"
13' - 0" 13' - 0"
RECIPROCAL ACCESSBACK YARD AREA38' X 8' 0"
10' - 0"
FRONT
SETBACK
TYP. ALONG SANTA CLARA STREET
69' - 0"
SIDE
SETBACK
ALLEY PLAN 1
RECIPROCAL ACCESSBACK YARD AREA38' X 8' 0"
32' - 0" 32' - 0"
ALLEY CENTERLINE
CL
RECIPROCAL ACCESSBACK YARD AREA38' X 8' 0"
. 14 SF
ENTRY
30 SF
Entry
21 SF
Kitchen/Dining
155 SF
Garage
444 SF
Pdr
25 SF
Entry
21 SF
Garage
425 SF
Kitchen
123 SF
Living
192 SF
Dining Room
146 SF
Pwdr. 27 SF
CL. 14 SF
ENTRY
30 SF
Kitchen/Dining
155 SF
Garage
444 SF
Pdr
25 SF
Living Room
209 SF
Entry
21 SF
Kitchen/Dining
155 SF
Garage
444 SF
Pdr
25 SF
Entry
21 SF
REAR
SETBACK
REAR
SETBACK
TYP. ALONG COMMUNITY OPEN SPACE
67' - 0"
32' - 0" 32' - 0"
4' - 6"
8' - 0"
FRONT
SETBACK
EXCEPTION
ALONG
COMMUNITY
SPACE
4' - 0" 4' - 0"
SIDE
SETBACK
SANTA CLARA STREET
COMMUNITY OPEN SPACE
6' - 6"
PORCH
SETBACK
5' - 0" 5' - 0"
4' - 0" 4' - 0"
RECIPROCAL ACCESSBACK YARD AREA38' X 8' 0"
4' - 0"
SIDE
SETBACK
PORCH
SETBACK
EXCEPTION
ALONG
COMMUNITY
SPACE
N:\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\0047-09_Pack Layouts.rvt 8/31/2018 9:15:53 AM
0047-09-RS18 - MIRAVALE PARCEL E A4
ALLEY SCHEMATIC LOT
226
MIRAVALE PARCEL E L1
# 0047-09-RS18
February 27, 2019
1” = 40’-0” (24X36 SHEET)
0 20 40 80
0 40 80 160
LANDSCAPE SITE PLAN 1” = 80’-0” (12X18 SHEET)
LEGEND
SITE FEATURES AND AMENITIES
L-1 MIRAVALE PARCEL E
SOLEDAD, CA
0047-09-RS15
APN: 022-441-017-000
CONCEPTUAL LANDSCAPE PLAN
SANTA CLARA STREET
PRIVATE PATIOS, TYP.
VEGETATED BASIN, TYP.
LOW WATER LANDSCAPE THROUGHOUT
DECORATIVE PAVING
TRELLIS AND TABLES
BUILT-IN BARBECUE
TURF AREA FOR PLAY AND PICNIC
TOT LOT WITH PLAY EQUIPMENT
FITNESS CIRCUIT
INFORMAL DOG RUN AND PLAY AREA
COMMUNITY GARDEN
BENCHES
1 1
1 2
2 2
3 3
3 3
3 5
5 6
6 4
4 7
7 8
8 9
9 10
10 11
12 12
12 11
SCALE: 1” = 40’-0”
0’ 40’20’ 80’ 120’
Attachment No. 3
227
MIRAVALE PARCEL E C1
# 0047-09-RS18
February 27, 2019
1” = 40’-0” (24X36 SHEET) 0 20 40 80 0 40 80 160
EXISTING SITE SURVEY 1” = 80’-0” (12X18 SHEET)
228
MIRAVALE PARCEL E C2
# 0047-09-RS18
February 27, 2019
1” = 30’-0” (24X36 SHEET)
0 15 30 60
0 30 60 120
PROPOSED SUBDIVISION 1” = 60’-0” (12X18 SHEET)
Attachment No. 2
229
MIRAVALE PARCEL E C3
# 0047-09-RS18
February 27, 2019
1” = 30’-0” (24X36 SHEET) 0 15 30 60 0 30 60 120
UTILITY PLAN 1” = 60’-0” (12X18 SHEET)
230
MIRAVALE PARCEL E C4
# 0047-09-RS18
February 27, 2019
1” = 30’-0” (24X36 SHEET) 0 15 30 60 0 30 60 120
CIVIL GRADING AND DRAINAGE PLAN 1” = 60’-0” (12X18 SHEET) 231
MIRAVALE PARCEL E C5
# 0047-09-RS18
February 27, 2019
1” = 30’-0” (24X36 SHEET) 0 15 30 60 0 30 60 120
CIVIL GRADING AND DRAINAGE PLAN 1” = 60’-0” (12X18 SHEET) 232
MIRAVALE PARCEL E C6
# 0047-09-RS18
February 27, 2019
1” = 40’-0” (24X36 SHEET) 0 20 40 80 0 40 80 160
STORM WATER MANAGEMENT PLAN 1” = 80’-0” (12X18 SHEET)
233
REF
DW
UP
D
W
PANTRY
155 SF
Kitchen/Dining
444 SF
Garage
25 SF
Pdr
209 SF
Living Room
2' - 0" 23' - 9" 18' - 3"
44' - 0"44' - 0"
22' - 0" 2' - 0"
12' - 8" 11' - 4"
21 SF
Entry
R T
10' - 4"
189 SF
M. Bedroom
107 SF
M. Bath
62 SF
WIC
131 SF
Bed 2
131 SF
Bed 3
27 SF
Laundry
43 SF
Bath 127 SF
Hall
4 SF
Linen
ROOF BELOW
18' - 3" 23' - 9"
42' - 0"
22' - 0" 2' - 0"
24' - 0"
38' - 7" 3' - 5"
42' - 0"
12' - 2" 11' - 10"
Architecture\Model\Alley\Alley Plan 1.rvt
0047-09-RS18 - MIRAVALE PARCEL E A7
ALLEY PLAN 1
1/4" = 1'-0" 1 GROUND FLOOR PLAN1/4" = 1'-0" 2 SECOND FLOOR PLAN PLAN 1 - AREAS
GROUND FLOOR 511 SF
SECOND FLOOR 879 SF
1,390 SF REF
DW
UP
D
W
PANTRY
155 SF
Kitchen/Dining
444 SF
Garage
25 SF
Pdr
209 SF
Living Room
2' - 0" 23' - 9" 18' - 3"
44' - 0"44' - 0"
22' - 0" 2' - 0"
12' - 8" 11' - 4"
21 SF
Entry
R T
10' - 4"
189 SF
M. Bedroom
107 SF
M. Bath
62 SF
WIC
131 SF
Bed 2
131 SF
Bed 3
27 SF
Laundry
43 SF
Bath 127 SF
Hall
4 SF
Linen
ROOF BELOW
18' - 3" 23' - 9"
42' - 0"
22' - 0" 2' - 0"
24' - 0"
38' - 7" 3' - 5"
42' - 0"
12' - 2" 11' - 10"
e
N:\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\Alley\Alley Plan 1.rvt 8/30/2018 4:56:58 PM
0047-09-RS18 - MIRAVALE PARCEL E A7
ALLEY PLAN 1
1/4" = 1'-0" 1 GROUND FLOOR PLAN1/4" = 1'-0" 2 SECOND FLOOR PLAN E
PLAN 1 - AREAS
GROUND FLOOR 511 SF
SECOND FLOOR 879 SF
1,390 SF
REF
DW
UP
PANTRY
155 SF
Kitchen/Dining
444 SF
Garage
25 SF
Pdr
209 SF
Living Room
2' - 0" 23' - 9" 18' - 3"
44' - 0"44' - 0"
22' - 0" 2' - 0"
12' - 8" 11' - 4"
21 SF
Entry
R T
10' - 4"
189 SF
M. Bedroom
131 SF
Bed 2
43 SF
Bath
ROOF BELOW
2 38' - 7" 3' - 5"
42' - 0"
12' - 2"
444 SF
Garage
N:\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\Alley\Alley Plan 1.rvt 8/30/2018 4:56:58 PM
0047-09-RS18 - M
1/4" = 1'-0" 1 GROUND FLOOR PLAN1/4" = 1'-0" 2 SECOND FLOOR PLAN1/4" = 1'-0" 3 GROUND FLOOR PLAN_SIDE GARAGE
OPTION
PLAN 1 - AREAS
GROUND FLOOR 511 SF
SECOND FLOOR 879 SF
1,390 SF
MIRAVALE PARCEL E A6
# 0047-09-RS18
February 27, 2019
1/4” = 1’-0” (24X36 SHEET)
0 2 4 8
0 4 8 16
FLOOR PLAN ALLEY PLAN 1 1/8” = 1’-0” (12X18 SHEET)
GROUND FLOOR PLAN 1 1/4" = 1'-0" (24 X 36 SHEET)SECOND FLOOR PLAN 2 1/4" = 1'-0" (24 X 36 SHEET) 234
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
MAX HEIGHT
25' - 5 1/2"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
1/4" = 1'-0" 1 EAST ELEVATION_SCHEMATIC1/4" = 1'-0" 2 NORTH ELEVATION_SCHEMATIC 01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
N:\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\Alley\Alley Plan 1.rvt 8/29/2018 5:51:50 PM
0047-09-RS18 - MIRA
1/4" = 1'-0" 1 EAST ELEVATION_SCHEMATIC1/4" = 1'-0" 2 NORTH ELEVATION_SCHEMATIC 1/4" = 1'-0" 3 SOUTH ELEVATION_SCHEMATIC1/4" = 1'-0" 4 WEST ELEVATION__SCHEMATIC 01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
MAX HEIGHT
25' - 5 1/2"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
ey\Alley Plan 1.rvt
0047-09-RS18 - MIRAVALE PARCEL E A7.2
ALLEY PLAN 1 ELEVATIONS
1/4" = 1'-0" 2 NORTH ELEVATION_SCHEMATIC
1/4" = 1'-0" 3 SOUTH ELEVATION_SCHEMATIC
MIRAVALE PARCEL E A7
# 0047-09-RS18
February 27, 2019
1/8” = 1’-0” (24X36 SHEET)
0 4 8 16
0 8 16 32
ELEVATIONS ALLEY PLAN 1_STYLE 1 1/16” = 1’-0” (12X18 SHEET) 0'-0” FF
GROUND LEVEL
25'-5.5”
MAX HEIGHT
10'-0” FF
SECOND FLOOR
30'-0”
MAX ALLOWABLE HEIGHT
RIGHT ELEVATION LEFT ELEVATION
REAR ELEVATION FRONT ELEVATION_SHOWN IN COLOR SCHEME D
1/4" = 1'-0" (24 X 36 SHEET)
235
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
24' - 11 1/2"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
1/4" = 1'-0" 1 EAST ELEVATION_SCHEMATIC1/4" = 1'-0" 2 NORTH ELEVATION_SCHEMATIC 01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
N:\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\Alley\Alley Plan 1.rvt 8/29/2018 5:54:33 PM
0047-09-RS18 - MIRAVA
1/4" = 1'-0" 1 EAST ELEVATION_SCHEMATIC1/4" = 1'-0" 2 NORTH ELEVATION_SCHEMATIC 1/4" = 1'-0" 3 SOUTH ELEVATION_SCHEMATIC1/4" = 1'-0" 4 WEST ELEVATION__SCHEMATIC 01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
24' - 11 1/2"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
el\Alley\Alley Plan 1.rvt
0047-09-RS18 - MIRAVALE PARCEL E A7.2
ALLEY PLAN 1 ELEVATIONS
1/4" = 1'-0" 2 NORTH ELEVATION_SCHEMATIC
1/4" = 1'-0" 3 SOUTH ELEVATION_SCHEMATIC
MIRAVALE PARCEL E A8
# 0047-09-RS18
February 27, 2019
1/8” = 1’-0” (24X36 SHEET)
0 4 8 16
0 8 16 32
1/16” = 1’-0” (12X18 SHEET)
0'-0” FF
GROUND LEVEL
24'-11.5”
MAX HEIGHT
10'-0” FF
SECOND FLOOR
30'-0”
MAX ALLOWABLE HEIGHT
RIGHT ELEVATION LEFT ELEVATION
REAR ELEVATION FRONT ELEVATION_SHOWN IN COLOR SCHEME C
1/4" = 1'-0" (24 X 36 SHEET)
ELEVATIONS ALLEY PLAN 1_STYLE 2
236
MIRAVALE PARCEL E A9
# 0047-09-RS18
February 27, 2019
1/8” = 1’-0” (24X36 SHEET)
0 4 8 16
0 8 16 32
ELEVATIONS ALLEY PLAN 1_STYLE 3 1/16” = 1’-0” (12X18 SHEET) 01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
1/4" = 1'-0" 1 EAST ELEVATION_SCHEMATIC1/4" = 1'-0" 2 NORTH ELEVATION_SCHEMATIC 01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
N:\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\Alley\Alley Plan 1.rvt 1/3/2019 12:12:28 PM
0047-09-RS18 - MIRAVA
1/4" = 1'-0" 1 EAST ELEVATION_SCHEMATIC1/4" = 1'-0" 2 NORTH ELEVATION_SCHEMATIC 1/4" = 1'-0" 3 SOUTH ELEVATION_SCHEMATIC1/4" = 1'-0" 4 WEST ELEVATION__SCHEMATIC 01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
ey\Alley Plan 1.rvt
0047-09-RS18 - MIRAVALE PARCEL E A7.2
ALLEY PLAN 1 ELEVATIONS
1/4" = 1'-0" 2 NORTH ELEVATION_SCHEMATIC
1/4" = 1'-0" 3 SOUTH ELEVATION_SCHEMATIC
0'-0” FF
GROUND LEVEL
24'-11.5”
MAX HEIGHT
10'-0” FF
SECOND FLOOR
30'-0”
MAX ALLOWABLE HEIGHT
RIGHT ELEVATION LEFT ELEVATION
REAR ELEVATION FRONT ELEVATION_SHOWN IN COLOR SCHEME E
1/4" = 1'-0" (24 X 36 SHEET)
237
MIRAVALE PARCEL E A10
# 0047-09-RS18
February 27, 2019
1/8” = 1’-0” (24X36 SHEET)
0 4 8 16
0 8 16 32
ELEVATIONS ALLEY PLAN 1_STYLE 4 1/16” = 1’-0” (12X18 SHEET) 01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
1/4" = 1'-0" 1 EAST ELEVATION_SCHEMATIC1/4" = 1'-0" 2 NORTH ELEVATION_SCHEMATIC 01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
\\corp\rrm\on-site\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\Alley\Alley Plan 1.rvt 1/8/2019 3:32:29 PM
0047-09-RS18 - MIRAVA
1/4" = 1'-0" 1 EAST ELEVATION_SCHEMATIC1/4" = 1'-0" 2 NORTH ELEVATION_SCHEMATIC 1/4" = 1'-0" 3 SOUTH ELEVATION_SCHEMATIC1/4" = 1'-0" 4 WEST ELEVATION__SCHEMATIC 01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
cture\Model\Alley\Alley Plan 1.rvt
0047-09-RS18 - MIRAVALE PARCEL E A7.2
ALLEY PLAN 1 ELEVATIONS
1/4" = 1'-0" 2 NORTH ELEVATION_SCHEMATIC
1/4" = 1'-0" 3 SOUTH ELEVATION_SCHEMATIC
0'-0” FF
GROUND LEVEL
24'-11.5”
MAX HEIGHT
10'-0” FF
SECOND FLOOR
30'-0”
MAX ALLOWABLE HEIGHT
RIGHT ELEVATION LEFT ELEVATION
REAR ELEVATION FRONT ELEVATION_SHOWN IN COLOR SCHEME C
1/4" = 1'-0" (24 X 36 SHEET)
238
UP
DW
REF
D W
425 SF
Garage
123 SF
Kitchen
192 SF
Living
146 SF
Dining Room
27 SF
Pwdr.
14 SF
CL.
30 SF
ENTRY
LINE OF WALL
ABOVE
16' - 0" 30' - 0"
46' - 0"
22' - 0" 2' - 0"
24' - 0"
44' - 0" 2' - 0"
46' - 0"
10' - 0" 14' - 0"
24' - 0"
R T
134 SF
Bed 2
133 SF
Bed 3
188 SF
M. Bedroom
219 SF
Loft
54 SF
Bath
66 SF
W.I.C
54 SF
LAUNDRY
70 SF
M. BATH
OPEN TO BELOW
ROOF BELOW
10' - 0" 14' - 0"
24' - 0"
30' - 0" 16' - 0"
46' - 0"
22' - 0" 2' - 0"
24' - 0"
44' - 0" 2' - 0"
46' - 0"
N:\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\Alley\Alley Plan 2.rvt 8/29/2018 5:51:31 PM
0047-09-RS18 - MIRAVALE PARCEL E A8
ALLEY PLAN 2
1/4" = 1'-0" 1 GROUND FLOOR PLAN1/4" = 1'-0" 2 SECOND FLOOR PLAN PLAN 2 - AREAS
GROUND FLOOR 586 SF
SECOND FLOOR 930 SF
1,516 SF
UP
DW
REF
D W
425 SF
Garage
123 SF
Kitchen
192 SF
Living
146 SF
Dining Room
27 SF
Pwdr.
14 SF
CL.
30 SF
ENTRY
LINE OF WALL
ABOVE
16' - 0" 30' - 0"
46' - 0"
22' - 0" 2' - 0"
24' - 0"
44' - 0" 2' - 0"
46' - 0"
10' - 0" 14' - 0"
24' - 0"
R T
134 SF
Bed 2
133 SF
Bed 3
188 SF
M. Bedroom
219 SF
Loft
54 SF
Bath
66 SF
W.I.C
54 SF
LAUNDRY
70 SF
M. BATH
OPEN TO BELOW
ROOF BELOW
10' - 0" 14' - 0"
24' - 0"
30' - 0" 16' - 0"
46' - 0"
22' - 0" 2' - 0"
24' - 0"
44' - 0" 2' - 0"
46' - 0"
N:\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\Alley\Alley Plan 2.rvt 8/29/2018 5:51:31 PM
0047-09-RS18 - MIRAVALE PARCEL E A8
ALLEY PLAN 2
1/4" = 1'-0" 1 GROUND FLOOR PLAN1/4" = 1'-0" 2 SECOND FLOOR PLAN PLAN 2 - AREAS
GROUND FLOOR 586 SF
SECOND FLOOR 930 SF
1,516 SF
UP
DW
REF
D W
425 SF
Garage
123 SF
Kitchen
192 SF
Living
146 SF
Dining Room
27 SF
Pwdr.
14 SF
CL.
30 SF
ENTRY
LINE OF WALL
ABOVE
16' - 0" 30' - 0"
46' - 0"
22' - 0" 2' - 0"
24' - 0"
44' - 0" 2' - 0"
46' - 0"
10' - 0" 14' - 0"
24' - 0"
R T
134 SF
Bed 2
133 SF
Bed 3
188 SF
M. Bedroom
219 SF
Loft
54 SF
Bath
66 SF
W.I.C
54 SF
LAUNDRY
70 SF
M. BATH
OPEN TO BELOW
ROOF BELOW
10' - 0" 14' - 0"
24' - 0"
22' - 0"
24' - 0"
44' - 0" 2' - 0"
46' - 0"
N:\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\Alley\Alley Plan 2.rvt 8/29/2018 5:51:31 PM
0047-09-RS18 - MI
1/4" = 1'-0" 1 GROUND FLOOR PLAN1/4" = 1'-0" 2 SECOND FLOOR PLAN PLAN 2 - AREAS
GROUND FLOOR 586 SF
SECOND FLOOR 930 SF
1,516 SF
MIRAVALE PARCEL E A11
# 0047-09-RS18 FLOOR PLAN ALLEY PLAN 2 February 27, 2019 GROUND FLOOR PLAN 1 1/8" = 1'-0" (24 X 36 SHEET)SECOND FLOOR PLAN 2 1/8" = 1'-0" (24 X 36 SHEET) 1/4” = 1’-0” (24X36 SHEET)
0 2 4 8
0 4 8 16
1/8” = 1’-0” (12X18 SHEET)
239
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
1/4" = 1'-0" 1 EAST ELEVATION_SCHEMATIC 1/4" = 1'-0" 2 NORTH ELEVATION_SCHEMATIC 01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
N:\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\Alley\Alley Plan 2.rvt 8/31/2018 5:30:30 PM
0047-09-RS18 - MIRAVALE P
ALLEY PL
1/4" = 1'-0" 1 EAST ELEVATION_SCHEMATIC 1/4" = 1'-0" 2 NORTH ELEVATION_SCHEMATIC 1/4" = 1'-0" 3 SOUTH ELEVATION_SCHEMATIC1/4" = 1'-0" 4 WEST ELEVATION_SCHEMATIC 01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
0047-09-RS18 - MIRAVALE PARCEL E A8.2
ALLEY PLAN 2 ELEVATIONS
1/4" = 1'-0" 2 NORTH ELEVATION_SCHEMATIC
1/4" = 1'-0" 3 SOUTH ELEVATION_SCHEMATIC
MIRAVALE PARCEL E A12
# 0047-09-RS18
February 27, 2019
1/8” = 1’-0” (24X36 SHEET)
0 4 8 16
0 8 16 32
1/16” = 1’-0” (12X18 SHEET)
0'-0” FF
GROUND LEVEL
25'-10.5”
MAX HEIGHT
10'-0” FF
SECOND FLOOR
30'-0”
MAX ALLOWABLE HEIGHT
RIGHT ELEVATION LEFT ELEVATION
REAR ELEVATION FRONT ELEVATION_SHOWN IN COLOR SCHEME B
1/4" = 1'-0" (24 X 36 SHEET)
ELEVATIONS ALLEY PLAN 2_STYLE 1
240
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
25' - 5 1/2"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
1/4" = 1'-0" 1 EAST ELEVATION_SCHEMATIC 1/4" = 1'-0" 2 NORTH ELEVATION_SCHEMATIC 01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
N:\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\Alley\Alley Plan 2.rvt 8/29/2018 5:56:19 PM
0047-09-RS18 - MIRAVALE PA
ALLEY PLA
1/4" = 1'-0" 1 EAST ELEVATION_SCHEMATIC 1/4" = 1'-0" 2 NORTH ELEVATION_SCHEMATIC 1/4" = 1'-0" 3 SOUTH ELEVATION_SCHEMATIC1/4" = 1'-0" 4 WEST ELEVATION_SCHEMATIC 01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
25' - 5 1/2"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
0047-09-RS18 - MIRAVALE PARCEL E A8.2
ALLEY PLAN 2 ELEVATIONS
1/4" = 1'-0" 2 NORTH ELEVATION_SCHEMATIC
1/4" = 1'-0" 3 SOUTH ELEVATION_SCHEMATIC
MIRAVALE PARCEL E A13
# 0047-09-RS18
February 27, 2019
1/8” = 1’-0” (24X36 SHEET)
0 4 8 16
0 8 16 32
1/16” = 1’-0” (12X18 SHEET)
0'-0” FF
GROUND LEVEL
25'-5.5”
MAX HEIGHT
10'-0” FF
SECOND FLOOR
30'-0”
MAX ALLOWABLE HEIGHT
RIGHT ELEVATION LEFT ELEVATION
REAR ELEVATION FRONT ELEVATION_SHOWN IN COLOR SCHEME A
1/4" = 1'-0" (24 X 36 SHEET)
ELEVATIONS ALLEY PLAN 2_STYLE 2
241
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
1/4" = 1'-0" 1 EAST ELEVATION_SCHEMATIC 1/4" = 1'-0" 2 NORTH ELEVATION_SCHEMATIC 01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
N:\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\Alley\Alley Plan 2.rvt 12/21/2018 2:58:12 PM
0047-09-RS18 - MIRAVALE PA
ALLEY PLA
1/4" = 1'-0" 1 EAST ELEVATION_SCHEMATIC 1/4" = 1'-0" 2 NORTH ELEVATION_SCHEMATIC 1/4" = 1'-0" 3 SOUTH ELEVATION_SCHEMATIC1/4" = 1'-0" 4 WEST ELEVATION_SCHEMATIC 01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
0047-09-RS18 - MIRAVALE PARCEL E A8.2
ALLEY PLAN 2 ELEVATIONS
1/4" = 1'-0" 2 NORTH ELEVATION_SCHEMATIC
1/4" = 1'-0" 3 SOUTH ELEVATION_SCHEMATIC
MIRAVALE PARCEL E A14
# 0047-09-RS18
February 27, 2019
1/8” = 1’-0” (24X36 SHEET)
0 4 8 16
0 8 16 32
1/16” = 1’-0” (12X18 SHEET)
0'-0” FF
GROUND LEVEL
25'-5.5”
MAX HEIGHT
10'-0” FF
SECOND FLOOR
30'-0”
MAX ALLOWABLE HEIGHT
RIGHT ELEVATION LEFT ELEVATION
REAR ELEVATION FRONT ELEVATION_SHOWN IN COLOR SCHEME E
1/4" = 1'-0" (24 X 36 SHEET)
ELEVATIONS ALLEY PLAN 2_STYLE 3
242
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
1/4" = 1'-0" 1 EAST ELEVATION_SCHEMATIC 1/4" = 1'-0" 2 NORTH ELEVATION_SCHEMATIC 01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
\\corp\rrm\on-site\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\Alley\Alley Plan 2.rvt 1/8/2019 3:28:33 PM
0047-09-RS18 - MIRAVALE PA
ALLEY PLA
1/4" = 1'-0" 1 EAST ELEVATION_SCHEMATIC 1/4" = 1'-0" 2 NORTH ELEVATION_SCHEMATIC 1/4" = 1'-0" 3 SOUTH ELEVATION_SCHEMATIC1/4" = 1'-0" 4 WEST ELEVATION_SCHEMATIC 01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
n 2.rvt
0047-09-RS18 - MIRAVALE PARCEL E A8.2
ALLEY PLAN 2 ELEVATIONS
1/4" = 1'-0" 2 NORTH ELEVATION_SCHEMATIC
1/4" = 1'-0" 3 SOUTH ELEVATION_SCHEMATIC
0'-0” FF
GROUND LEVEL
25'-5.5”
MAX HEIGHT
10'-0” FF
SECOND FLOOR
30'-0”
MAX ALLOWABLE HEIGHT
RIGHT ELEVATION LEFT ELEVATION
REAR ELEVATION FRONT ELEVATION_SHOWN IN COLOR SCHEME D
1/4" = 1'-0" (24 X 36 SHEET)
MIRAVALE PARCEL E A15
# 0047-09-RS18
February 27, 2019
1/8” = 1’-0” (24X36 SHEET)
0 4 8 16
0 8 16 32
ELEVATIONS ALLEY PLAN 2_STYLE 4 1/16” = 1’-0” (12X18 SHEET) 243
D
W
REF
UP
130 SF
Bed 3
114 SF
Bed 2
196 SF
M. Bed
51 SF
WIC
91 SF
M. Bath
135 SF
Hall
53 SF
Bath
17 SF
Ldr
L
38' - 0"
35' - 0"
L
ROOF BELOW
5' - 0" 11' - 6" 21' - 6"
9' - 0" 17' - 0" 9' - 0"
14' - 11" 18' - 1" 5' - 0"
38' - 0"
5' - 0" 21' - 0" 9' - 0"
35' - 0"
420 SF
Garage
144 SF
Kitchen
44 SF
Entry
107 SF
Dining
38' - 0"
35' - 0"
5' - 0" 21' - 0" 9' - 0"
133 SF
Living
21' - 6" 16' - 6"
27 SF
PDR.
8 SF
CL. L
14' - 11" 18' - 1" 5' - 0"
9' - 0" 26' - 0"
38' - 0"
35' - 0"
N:\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\AutoCourt\Court_Plan 3.rvt 8/29/2018 6:20:06 PM
0047-09-RS18 - MIRAVALE PARCEL E A5
COURT PLAN 3
1/4" = 1'-0" 2 SECOND FLOOR PLAN1/4" = 1'-0" 1 GROUND FLOOR PLAN PLAN 3 - AREAS
GROUND FLOOR 537 SF
SECOND FLOOR 920 SF
1,457 SF
D
W
REF
UP
130 SF
Bed 3
114 SF
Bed 2
196 SF
M. Bed
51 SF
WIC
91 SF
M. Bath
135 SF
Hall
53 SF
Bath
17 SF
Ldr
L
38' - 0"
35' - 0"
L
ROOF BELOW
5' - 0" 11' - 6" 21' - 6"
9' - 0" 17' - 0" 9' - 0"
14' - 11" 18' - 1" 5' - 0"
38' - 0"
5' - 0" 21' - 0" 9' - 0"
35' - 0"
420 SF
Garage
144 SF
Kitchen
44 SF
Entry
107 SF
Dining
38' - 0"
35' - 0"
5' - 0" 21' - 0" 9' - 0"
133 SF
Living
21' - 6" 16' - 6"
27 SF
PDR.
8 SF
CL. L
14' - 11" 18' - 1" 5' - 0"
9' - 0" 26' - 0"
38' - 0"
35' - 0"
N:\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\AutoCourt\Court_Plan 3.rvt 8/29/2018 6:20:06 PM
0047-09-RS18 - MIRAVALE PARCEL E A5
COURT PLAN 3
1/4" = 1'-0" 2 SECOND FLOOR PLAN1/4" = 1'-0" 1 GROUND FLOOR PLAN PLAN 3 - AREAS
GROUND FLOOR 537 SF
SECOND FLOOR 920 SF
1,457 SF
D
W
REF
UP
130 SF
Bed 3
114 SF
Bed 2
196 SF
M. Bed
51 SF
WIC
135 SF
Hall
53 SF
Bath
17 SF
Ldr
38' - 0"
35' - 0"
L
9' - 0" 17' - 0"
14' - 11" 18' - 1" 5' - 0"
5' - 0" 21' - 0"
35' - 0"
420 SF
Garage
144 SF
Kitchen
44 SF
Entry
107 SF
Dining
38' - 0"
35' - 0"
5' - 0" 21' - 0" 9' - 0"
133 SF
Living
21' - 6" 16' - 6"
27 SF
PDR.
8 SF
CL. L
14' - 11" 18' - 1" 5' - 0"
9' - 0" 26' - 0"
38' - 0"
35' - 0"
N:\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\AutoCourt\Court_Plan 3.rvt 8/29/2018 6:20:06 PM
0047-09-RS18 - M
1/4" = 1'-0" 2 SECOND FLOOR PLAN1/4" = 1'-0" 1 GROUND FLOOR PLAN PLAN 3 - AREAS
GROUND FLOOR 537 SF
SECOND FLOOR 920 SF
1,457 SF
MIRAVALE PARCEL E A16
# 0047-09-RS18 FLOOR PLAN COURT PLAN 3 February 27, 2019 GROUND FLOOR PLAN 1 1/8" = 1'-0" (24 X 36 SHEET)SECOND FLOOR PLAN 2 1/8" = 1'-0" (24 X 36 SHEET) 1/4” = 1’-0” (24X36 SHEET)
0 2 4 8
0 4 8 16
1/8” = 1’-0” (12X18 SHEET)
244
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02- T.O.P.
19' - 0"
24' - 8 1/2"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02- T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02- T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02- T.O.P.
19' - 0"
1/4" = 1'-0" 2 RIGHT ELEVATION_SCHEMATIC
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02- T.O.P.
19' - 0"
24' - 8 1/2"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02- T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02- T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02- T.O.P.
19' - 0"
N:\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\AutoCourt\Court_Plan 3.rvt 8/30/2018 1:52:57 PM
0047-09-RS18 - MIRAVALE PARCEL E A5.2
COURT PLAN 3 ELEVATIONS
1/4" = 1'-0" 1 FRONT ELEVATION_SCHEMATIC1/4" = 1'-0" 2 RIGHT ELEVATION_SCHEMATIC 1/4" = 1'-0" 3 LEFT ELEVATION_SCHEMATIC1/4" = 1'-0" 4 REAR ELEVATION_SCHEMATIC 01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02- T.O.P.
19' - 0"
24' - 8 1/2"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02- T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02- T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02- T.O.P.
19' - 0"
N:\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\AutoCourt\Court_Plan 3.rvt 8/30/2018 1:52:57 PM
0047-09-RS18 - MIRAVALE PARCEL E A5.2
COURT PLAN 3 ELEVATIONS
1/4" = 1'-0" 1 FRONT ELEVATION_SCHEMATIC1/4" = 1'-0" 2 RIGHT ELEVATION_SCHEMATIC 1/4" = 1'-0" 3 LEFT ELEVATION_SCHEMATIC1/4" = 1'-0" 4 REAR ELEVATION_SCHEMATIC MIRAVALE PARCEL E A17
# 0047-09-RS18
February 27, 2019
1/8” = 1’-0” (24X36 SHEET)
0 4 8 16
0 8 16 32
1/16” = 1’-0” (12X18 SHEET)
0'-0” FF
GROUND LEVEL
24’-8.5”
MAX HEIGHT
10'-0” FF
SECOND FLOOR
30'-0”
MAX ALLOWABLE HEIGHT
RIGHT ELEVATION LEFT ELEVATION
REAR ELEVATION FRONT ELEVATION_SHOWN IN COLOR SCHEME D
1/4" = 1'-0" (24 X 36 SHEET)
ELEVATIONS COURT PLAN 3_STYLE 1
245
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02- T.O.P.
19' - 0"
24' - 8 151/256"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02- T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02- T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02- T.O.P.
19' - 0"
1/4" = 1'-0" 2 RIGHT ELEVATION_SCHEMATIC
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02- T.O.P.
19' - 0"
24' - 8 151/256"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02- T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02- T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02- T.O.P.
19' - 0"
N:\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\AutoCourt\Court_Plan 3.rvt 8/30/2018 1:54:18 PM
0047-09-RS18 - MIRAVALE PARCEL E A5.2
COURT PLAN 3 ELEVATIONS
1/4" = 1'-0" 1 FRONT ELEVATION_SCHEMATIC1/4" = 1'-0" 2 RIGHT ELEVATION_SCHEMATIC 1/4" = 1'-0" 3 LEFT ELEVATION_SCHEMATIC1/4" = 1'-0" 4 REAR ELEVATION_SCHEMATIC 01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02- T.O.P.
19' - 0"
24' - 8 151/256"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02- T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02- T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02- T.O.P.
19' - 0"
N:\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\AutoCourt\Court_Plan 3.rvt 8/30/2018 1:54:18 PM
0047-09-RS18 - MIRAVALE PARCEL E A5.2
COURT PLAN 3 ELEVATIONS
1/4" = 1'-0" 1 FRONT ELEVATION_SCHEMATIC1/4" = 1'-0" 2 RIGHT ELEVATION_SCHEMATIC 1/4" = 1'-0" 3 LEFT ELEVATION_SCHEMATIC1/4" = 1'-0" 4 REAR ELEVATION_SCHEMATIC MIRAVALE PARCEL E A18
# 0047-09-RS18
February 27, 2019
1/8” = 1’-0” (24X36 SHEET)
0 4 8 16
0 8 16 32
1/16” = 1’-0” (12X18 SHEET)
0'-0” FF
GROUND LEVEL
24'-8.5”
MAX HEIGHT
10'-0” FF
SECOND FLOOR
30'-0”
MAX ALLOWABLE HEIGHT
RIGHT ELEVATION LEFT ELEVATION
REAR ELEVATION FRONT ELEVATION_SHOWN IN COLOR SCHEME C
1/4" = 1'-0" (24 X 36 SHEET)
ELEVATIONS COURT PLAN 3_STYLE 2
246
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02- T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02- T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02- T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02- T.O.P.
19' - 0"
1/4" = 1'-0" 2 RIGHT ELEVATION_SCHEMATIC
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02- T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02- T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02- T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02- T.O.P.
19' - 0"
N:\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\AutoCourt\Court_Plan 3.rvt 1/3/2019 12:29:16 PM
0047-09-RS18 - MIRAVALE PARCEL E A5.2
COURT PLAN 3 ELEVATIONS
1/4" = 1'-0" 1 FRONT ELEVATION_SCHEMATIC1/4" = 1'-0" 2 RIGHT ELEVATION_SCHEMATIC 1/4" = 1'-0" 3 LEFT ELEVATION_SCHEMATIC1/4" = 1'-0" 4 REAR ELEVATION_SCHEMATIC 01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02- T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02- T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02- T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02- T.O.P.
19' - 0"
N:\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\AutoCourt\Court_Plan 3.rvt 1/3/2019 12:29:16 PM
0047-09-RS18 - MIRAVALE PARCEL E A5.2
COURT PLAN 3 ELEVATIONS
1/4" = 1'-0" 1 FRONT ELEVATION_SCHEMATIC1/4" = 1'-0" 2 RIGHT ELEVATION_SCHEMATIC 1/4" = 1'-0" 3 LEFT ELEVATION_SCHEMATIC1/4" = 1'-0" 4 REAR ELEVATION_SCHEMATIC MIRAVALE PARCEL E A19
# 0047-09-RS18
February 27, 2019
1/8” = 1’-0” (24X36 SHEET)
0 4 8 16
0 8 16 32
1/16” = 1’-0” (12X18 SHEET)
0'-0” FF
GROUND LEVEL
24'-8.5”
MAX HEIGHT
10'-0” FF
SECOND FLOOR
30'-0”
MAX ALLOWABLE HEIGHT
RIGHT ELEVATION LEFT ELEVATION
REAR ELEVATION FRONT ELEVATION_SHOWN IN COLOR SCHEME E
1/4" = 1'-0" (24 X 36 SHEET)
ELEVATIONS COURT PLAN 3_STYLE 3
247
W
D
UP
UP
REF
DW
UP
213 SF
M. Bed
134 SF
Bed 2
131 SF
Bed 3
92 SF
M. Bath
50 SF
WIC
18 SF
Ldr
74 SF
Bath
190 SF
Loft
L
L
9' - 1" 21' - 11"
9' - 1" 16' - 6" 5' - 5"
31' - 0"
10' - 4" 26' - 4" 2' - 4"
39' - 0"
31' - 0"
24' - 8" 14' - 4"
39' - 0"
88 SF
Dining
422 SF
Garage
7 SF
CC
146 SF
Kitchen 231 SF
Living
61 SF
Entry
10' - 4" 28' - 8"
25' - 7" 5' - 5"
8' - 2" 30' - 10"
9' - 1" 21' - 11"
31' - 0"
39' - 0"
31' - 0"
39' - 0"
21 SF
PDR.
61 SF
Entry
-II-Parcel-E-Zero-Lot-Line\Architecture\Model\AutoCourt\Court_Plan 4.rvt 0047-09-RS18 - MIRAVALE PARCEL E A6
COURT PLAN 4
1/4" = 1'-0" 2 SECOND FLOOR PLAN1/4" = 1'-0" 1 GROUND FLOOR PLAN PLAN 4 - AREAS
GROUND FLOOR 609 SF
SECOND FLOOR 970 SF
1,578 SF
W
D
UP
UP
REF
DW
UP
213 SF
M. Bed
134 SF
Bed 2
131 SF
Bed 3
92 SF
M. Bath
50 SF
WIC
18 SF
Ldr
74 SF
Bath
190 SF
Loft
L
L
9' - 1" 21' - 11"
9' - 1" 16' - 6" 5' - 5"
31' - 0"
10' - 4" 26' - 4" 2' - 4"
39' - 0"
31' - 0"
24' - 8" 14' - 4"
39' - 0"
88 SF
Dining
422 SF
Garage
7 SF
CC
146 SF
Kitchen 231 SF
Living
61 SF
Entry
10' - 4" 28' - 8"
25' - 7" 5' - 5"
8' - 2" 30' - 10"
9' - 1" 21' - 11"
31' - 0"
39' - 0"
31' - 0"
39' - 0"
21 SF
PDR.
422 SF
Garage
61 SF
Entry
21 SF
PDR.
N:\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\AutoCourt\Court_Plan 4.rvt 8/29/2018 6:24:51 PM
0047-09-RS18 - MIRAVALE PARCEL E A6
COURT PLAN 4
1/4" = 1'-0" 2 SECOND FLOOR PLAN1/4" = 1'-0" 1 GROUND FLOOR PLAN PLAN 4 - AREAS
GROUND FLOOR 609 SF
SECOND FLOOR 970 SF
1,578 SF
UP
REF
DW
UP
92 SF
M. Bath
50 SF
WIC
190 SF
Loft
9' - 1"
9' - 1"
10' - 4" 26' - 4" 2' - 4"
39' - 0"
88 SF
Dining
422 SF
Garage
7 SF
CC
146 SF
Kitchen 231 SF
Living
61 SF
Entry
10' - 4" 28' - 8"
25' - 7" 5' - 5"
8' - 2" 30' - 10"
9' - 1" 21' - 11"
31' - 0"
39' - 0"
31' - 0"
39' - 0"
21 SF
PDR.
88 SF
Dining
422 SF
Garage
7 SF
CC
61 SF
Entry
P
21 SF
PDR.
N:\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\AutoCourt\Court_Plan 4.rvt 8/29/2018 6:24:51 PM
0047-09-RS18 - MIR
1/4" = 1'-0" 2 SECOND FLOOR PLAN1/4" = 1'-0" 1 GROUND FLOOR PLAN PLAN 4 - AREAS
GROUND FLOOR 609 SF
SECOND FLOOR 970 SF
1,578 SF
1/4" = 1'-0" 3 OPTIONAL AUTO COURT ENTRY
MIRAVALE PARCEL E A20
# 0047-09-RS18 FLOOR PLAN COURT PLAN 4 February 27, 2019 GROUND FLOOR PLAN 1 1/8" = 1'-0" (24 X 36 SHEET)SECOND FLOOR PLAN 2 1/8" = 1'-0" (24 X 36 SHEET) 1/4” = 1’-0” (24X36 SHEET)
0 2 4 8
0 4 8 16
1/8” = 1’-0” (12X18 SHEET)
248
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
26' - 0 1/2"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
1/4" = 1'-0" 1 RIGHT ELEVATION_SCHEMATIC1/4" = 1'-0" 2 REAR ELEVATION_SCHEMATIC 01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
N:\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\AutoCourt\Court_Plan 4.rvt 8/31/2018 8:33:52 AM
0047-09-RS18 - MIRAVALE P
COURT P
1/4" = 1'-0" 1 RIGHT ELEVATION_SCHEMATIC1/4" = 1'-0" 2 REAR ELEVATION_SCHEMATIC 1/4" = 1'-0" 3
STREET FRONT
ELEVATION_SCHEMATIC
1/4" = 1'-0" 4 LEFT ELEVATION_SCHEMATIC
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
26' - 0 1/2"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
utoCourt\Court_Plan 4.rvt
0047-09-RS18 - MIRAVALE PARCEL E A6.2
COURT PLAN 4 ELEVATIONS
1/4" = 1'-0" 2 REAR ELEVATION_SCHEMATIC
1/4" = 1'-0" 3
STREET FRONT
ELEVATION_SCHEMATIC
MIRAVALE PARCEL E A21
# 0047-09-RS18
February 27, 2019
1/8” = 1’-0” (24X36 SHEET)
0 4 8 16
0 8 16 32
1/16” = 1’-0” (12X18 SHEET)
0'-0” FF
GROUND LEVEL
26'-.5”
MAX HEIGHT
10'-0” FF
SECOND FLOOR
30'-0”
MAX ALLOWABLE HEIGHT
RIGHT ELEVATION LEFT ELEVATION
REAR ELEVATION FRONT ELEVATION_SHOWN IN COLOR SCHEME B
1/4" = 1'-0" (24 X 36 SHEET)
ELEVATIONS COURT PLAN 4_STYLE 1
249
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
25' - 10 1/2"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
1/4" = 1'-0" 1 RIGHT ELEVATION_SCHEMATIC1/4" = 1'-0" 2 REAR ELEVATION_SCHEMATIC 01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
N:\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\AutoCourt\Court_Plan 4.rvt 8/31/2018 8:32:02 AM
0047-09-RS18 - MIRAVALE P
COURT P
1/4" = 1'-0" 1 RIGHT ELEVATION_SCHEMATIC1/4" = 1'-0" 2 REAR ELEVATION_SCHEMATIC 1/4" = 1'-0" 3
STREET FRONT
ELEVATION_SCHEMATIC
1/4" = 1'-0" 4 LEFT ELEVATION_SCHEMATIC
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
25' - 10 1/2"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
utoCourt\Court_Plan 4.rvt
0047-09-RS18 - MIRAVALE PARCEL E A6.2
COURT PLAN 4 ELEVATIONS
1/4" = 1'-0" 2 REAR ELEVATION_SCHEMATIC
1/4" = 1'-0" 3
STREET FRONT
ELEVATION_SCHEMATIC
MIRAVALE PARCEL E A22
# 0047-09-RS18
February 27, 2019
1/8” = 1’-0” (24X36 SHEET)
0 4 8 16
0 8 16 32
1/16” = 1’-0” (12X18 SHEET)
0'-0” FF
GROUND LEVEL
25'-10.5”
MAX HEIGHT
10'-0” FF
SECOND FLOOR
30'-0”
MAX ALLOWABLE HEIGHT
RIGHT ELEVATION LEFT ELEVATION
REAR ELEVATION FRONT ELEVATION_SHOWN IN COLOR SCHEME A
1/4" = 1'-0" (24 X 36 SHEET)
ELEVATIONS COURT PLAN 4_STYLE 2
250
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
1/4" = 1'-0" 1 RIGHT ELEVATION_SCHEMATIC1/4" = 1'-0" 2 REAR ELEVATION_SCHEMATIC 01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
N:\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\AutoCourt\Court_Plan 4.rvt 1/3/2019 11:31:37 AM
0047-09-RS18 - MIRAVALE P
COURT P
1/4" = 1'-0" 1 RIGHT ELEVATION_SCHEMATIC1/4" = 1'-0" 2 REAR ELEVATION_SCHEMATIC 1/4" = 1'-0" 3
STREET FRONT
ELEVATION_SCHEMATIC
1/4" = 1'-0" 4 LEFT ELEVATION_SCHEMATIC
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
utoCourt\Court_Plan 4.rvt
0047-09-RS18 - MIRAVALE PARCEL E A6.2
COURT PLAN 4 ELEVATIONS
1/4" = 1'-0" 2 REAR ELEVATION_SCHEMATIC
1/4" = 1'-0" 3
STREET FRONT
ELEVATION_SCHEMATIC
MIRAVALE PARCEL E A23
# 0047-09-RS18
February 27, 2019
1/8” = 1’-0” (24X36 SHEET)
0 4 8 16
0 8 16 32
1/16” = 1’-0” (12X18 SHEET)
0'-0” FF
GROUND LEVEL
25'-10.5”
MAX HEIGHT
10'-0” FF
SECOND FLOOR
30'-0”
MAX ALLOWABLE HEIGHT
RIGHT ELEVATION LEFT ELEVATION
REAR ELEVATION FRONT ELEVATION_SHOWN IN COLOR SCHEME E
1/4" = 1'-0" (24 X 36 SHEET)
ELEVATIONS COURT PLAN 4_STYLE 3
251
MIRAVALE PARCEL E A24
# 0047-09-RS18
February 27, 2019
1/8” = 1’-0” (24X36 SHEET) 0 4 8 16 0 8 16 32
STREET ELEVATION VARIETY 1/16” = 1’-0” (12X18 SHEET)
252
01-GROUND
FLOOR
0' - 0"
FLOOR
10' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
MAX HEIGHT
25' - 5 1/2"
0047-09-RS18 - MIRAVALE PARCEL E A7.2
ALLEY PLAN 1 ELEVATIONS
1/4" = 1'-0" 2 NORTH ELEVATION_SCHEMATIC
1/4" = 1'-0" 3 SOUTH ELEVATION_SCHEMATIC
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
\Alley\Alley Plan 2.rvt
0047-09-RS18 - MIRAVALE PARCEL E A8.2
ALLEY PLAN 2 ELEVATIONS
1/4" = 1'-0" 2 NORTH ELEVATION_SCHEMATIC
1/4" = 1'-0" 3 SOUTH ELEVATION_SCHEMATIC
01-GROUND
FLOOR
0' - 0"
01-G
01-GRO
FL
02-SEC
FL
1 02-T
1 26' - 0 1/2"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02-T.O.P.
19' - 0"
N:\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\AutoCourt\Court_Plan 4.rvt 8/31/2018 8:33:52 AM
0047-09-RS18 - MIRAVALE PARCEL E A
COURT PLAN 4 ELEVATIONS
1/4" = 1'-0" 1 RIGHT ELEVATION_SCHEMATIC1/4" = 1'-0" 2 REAR ELEVATION_SCHEMATIC 1/4" = 1'-0" 3
STREET FRONT
ELEVATION_SCHEMATIC
1/4" = 1'-0" 4 LEFT ELEVATION_SCHEMATIC
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02- T.O.P.
19' - 0"
24' - 8 1/2"
01-GROUND
FLOOR
0' - 0"
02-SECOND
FLOOR
10' - 0"
02- T.O.P.
19' - 0"
N:\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\AutoCourt\Court_Plan 3.rvt 8/30/2018 1:52:57 PM
0047-09-RS18 - M
1/4" = 1'-0" 1 FRONT ELEVATION_SCHEMATIC1/4" = 1'-0" 2 RIGHT ELEVATION_SCHEMATIC 1/4" = 1'-0" 3 LEFT ELEVATION_SCHEMATIC1/4" = 1'-0" 4 REAR ELEVATION_SCHEMATIC MIRAVALE PARCEL E A25
# 0047-09-RS18
February 27, 2019
1/8” = 1’-0” (24X36 SHEET)
0 4 8 16
0 8 16 32
COLOR AND MATERIALS 1/16” = 1’-0” (12X18 SHEET)
5 4 4
2 2
6 6 6
2 5 5
3 3 3 3
5 5
1 1 1
1 COLOR SCHEME A
1. MAIN PAINT COLOR:
SHERWIN WILLIAMS PURE WHITE SW7005
2. ACCENT PAINT COLOR:
SHERWIN WILLIAMS UNUSUAL GRAY SW7059
3. DOOR COLOR:
SHERWIN WILLIAMS ROCK BOTTOM SW7062
4. ASPHALT SHINGLE ROOFING:
GAF TIMBERLINE HD IN CHARCOAL
1. 2.
3. 4.
COLOR SCHEME B
1. MAIN PAINT COLOR:
SHERWIN WILLIAMS HALCYON GREEN SW6213
2. ACCENT PAINT COLOR:
SHERWIN WILLIAMS BELIEVABLE BUFF SW6120
3. DOOR COLOR:
SHERWIN WILLIAMS SPICY HUE SW6342
4. ASPHALT SHINGLE ROOFING:
GAF TIMBERLINE HD IN BIRCHWOOD
1. 2.
3. 4.
COLOR SCHEME C
1. MAIN PAINT COLOR:
SHERWIN WILLIAMS JERSEY CREAM SW6379
2. ACCENT PAINT COLOR:
SHERWIN WILLIAMS SVELTE SAGE SW6164
3. DOOR COLOR:
SHERWIN WILLIAMS SHADE-GROWN SW6188
4. ASPHALT SHINGLE ROOFING:
GAF TIMBERLINE HD IN HUNTER GREEN
1. 2.
3. 4.1.
COLOR SCHEME D
1. MAIN PAINT COLOR:
SHERWIN WILLIAMS ROYCRAFT COPPER RED SW2839
2. ACCENT PAINT COLOR:
SHERWIN WILLIAMS BALANCED BEIGE SW7037
3. DOOR COLOR:
SHERWIN WILLIAMS VAN DYKE BROWN SW7041
4. ASPHALT SHINGLE ROOFING:
GAF TIMBERLINE HD IN BARKWOOD
1. 2.
3. 4.
6. 7.
5. TYPICAL MATERIALS/COLORS/SPECS
5. TRIM COLOR:
SHERWIN WILLIAMS COTTON WHITE SW7104
6. ACCENT CORRUGATED METAL ROOFING:
GALVANIZED CHARCOAL
7. EXTERIOR GOOSENECK LIGHT FIXTURE
253
MIRAVALE PARCEL E A26
# 0047-09-RS18 APARTMENT UNIT PLANS February 27, 2019
REF DW
L.
21' - 0" 4' - 0"
25' - 0"
10' - 4 1/2" 23' - 7 1/2" 13' - 0"
BED 3
10'-1" x 10'-2"
CL
8'-1"
BED 2
10'-1" x 10'-1"
CL
5'-10"
COATS PNTRY
LAUNDRY
6'-0" x 3'-0"
BATH
10'-6" x 7'-0"
M. BED
10'-1" x 12'-4"
CL
8'-0"
M. BATH
10'-1" x 7'-5"
LIVING
12'-6" x 14'-4"
KITCHEN/DINING
13'-1" x 9'-9"
ENTRY
HALL
DECK
11'-6" x 8'-0"
47' - 0"
DW REF
12' - 10 1/2" 21' - 4 1/2" 12' - 9"
21' - 0" 4' - 0"
M. BED
12'-7" x 12'-9"
M. BATH
10'-6" x 7'-0"
W.I.C.
4'-2" x 7'-0"
BATH
10'-6" x 7'-0"
LAUNDRY
3'-0" x 6'-0"
BED 2
10'-1" x 10'-1"
BED 3
10'-1" x 10'-1"
CL
6'-1"
CL
6'-1"
HALL
KITCHEN/DINING
13'-3" x 9'-6"
LIVING
12'-6" x 10'-2"
DECK
11'-6" x 8'-0"
CL
3'-2"
47' - 0"
25' - 0"
DW REF
L.
10' - 9 1/2" 11' - 5" 12' - 9 1/2"
21' - 0" 4' - 0"
25' - 0"
35' - 0"
BED 2
10'-6" x 10'-2"
BED
10'-2" x 10'-1"
CL
8'-6"
CL
6'-3"
BATH
10'-6" x 7'-0"
HALL
LIVING
12'-6" x 10'-6"
KITCHEN/DINING
17'-0" x 9'-6"
CL
3'-6"
LAUNDRY
6'-0" x 3-0"
DECK
11'-6" x 8'-0"
3765 S. Higuera St., Ste. 102 ● San Luis Obispo, CA 93401 p: (805) 543-1794 ● f: (805) 543-4609
www.rrmdesign.com
a California corporation ● Lenny Grant, Architect C26973 ● Jerry Michael, PE 36895, LS 6276 ● Jeff Ferber, LA 2844
N:\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\Apt Bldgs\2 BEDROOM.rvt 2/27/2019 8:51:29 PM
A1 SCHEMATIC FLOOR PLAN
1/4” = 1’-0” (24X36 SHEET)
0 2 4 8
0 4 8 16
1/8” = 1’-0” (12X18 SHEET)
3 BEDROOM - A - FLOOR PLAN 2 1/8" = 1'-0" (12 X 18 SHEET) 2 BEDROOM FLOOR PLAN 1 1/8" = 1'-0" (12 X 18 SHEET)
3 BEDROOM - B - FLOOR PLAN 3 1/8" = 1'-0" (12 X 18 SHEET) 254
UP
25' - 0" 8' - 0" 35' - 0" 0' - 2" 35' - 0" 8' - 0" 35' - 0" 0' - 2" 35' - 0" 8' - 0" 25' - 0" 214' - 4"
25' - 0" 9' - 8 1/2" 47' - 0" 0' - 2" 47' - 0" 0' - 2" 47' - 0" 13' - 3 1/2" 25' - 0" 214' - 4"
3' - 0" 47' - 0" 0' - 2"
50' - 2"
3765 S. Higuera St., Ste. 102 ● San Luis Obispo, CA 93401 p: (805) 543-1794 ● f: (805) 543-4609
www.rrmdesign.com
a California corporation ● Lenny Grant, Architect C26973 ● Jerry Michael, PE 36895, LS 6276 ● Jeff Ferber, LA 2844
N:\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\Apt Bldgs\BUILDING 1.rvt 2/27/2019 4:44:43 PM
A1 SCHEMATIC FLOOR PLAN
MULTIFAMILY UNITS - AREAS
2 BED UNIT 727 SF
3 BED UNIT B 1007 SF
3 BED UNIT A 1002 SF
2 2 2 2
3B 3A 3B
3A 3A
MIRAVALE PARCEL E A27
# 0047-09-RS18
February 27, 2019
1/8” = 1’-0” (24X36 SHEET)
0 4 8 16
0 8 16 32
BUILDING 1 PLAN 1/16” = 1’-0” (12X18 SHEET)
BUILDING 1 PLAN 1 1/16" = 1'-0" (12 X 18 SHEET)
255
MIRAVALE PARCEL E A28
# 0047-09-RS18
February 27, 2019
1/8” = 1’-0” (24X36 SHEET) 0 4 8 16 0 8 16 32
BUILDING 1 ELEVATION 1/16” = 1’-0” (12X18 SHEET)
256
UP
47' - 0" 0' - 2" 47' - 0"
94' - 2"
35' - 0" 8' - 0" 35' - 0"
78' - 0"
25' - 0" 0' - 2" 25' - 0"
50' - 2"
3765 S. Higuera St., Ste. 102 ● San Luis Obispo, CA 93401 p: (805) 543-1794 ● f: (805) 543-4609
www.rrmdesign.com
a California corporation ● Lenny Grant, Architect C26973 ● Jerry Michael, PE 36895, LS 6276 ● Jeff Ferber, LA 2844
N:\0001\0047-09-RS18-Miravale-II-Parcel-E-Zero-Lot-Line\Architecture\Model\Apt Bldgs\BUILDING 2.rvt 2/27/2019 8:53:34 PM
A1 SCHEMATIC FLOOR PLAN
BUILDING 2 PLAN 1 1/8" = 1'-0" (12 X 18 SHEET)
3B
2 3B
2 MIRAVALE PARCEL E A29
# 0047-09-RS18 BUILDING 2 PLAN February 27, 2019
1/4” = 1’-0” (24X36 SHEET)
0 2 4 8
0 4 8 16
1/8” = 1’-0” (12X18 SHEET)
257
MIRAVALE PARCEL E A30
# 0047-09-RS18 BUILDING 2 ELEVATION February 27, 2019
1/4” = 1’-0” (24X36 SHEET) 0 2 4 8 0 4 8 16
1/8” = 1’-0” (12X18 SHEET)
258
LEGEND
SITE FEATURES AND AMENITIES
SANTA CLARA STREET
PRIVATE PATIOS, TYP.
VEGETATED BASIN, TYP.
LOW WATER LANDSCAPE THROUGHOUT
DECORATIVE PAVING
TRELLIS AND TABLES
BUILT-IN BARBECUE
TURF AREA FOR PLAY AND PICNIC
TOT LOT WITH PLAY EQUIPMENT
FITNESS CIRCUIT
1 1
1 2
2 2
3 3
3 3
3 5
5 6
6 4
4 7
7 8
8 9
9 10
12 12
11 MIRAVALE PARCEL E A31
# 0047-09-RS18
February 27, 2019
1/8” = 1’-0” (24X36 SHEET) 0 4 8 16 0 8 16 32
CHARACTER VIGNETTES 1/16” = 1’-0” (12X18 SHEET)
SANTA CLARA STREET VIEW
259
LEGEND
SITE FEATURES AND AMENITIES
SANTA CLARA STREET
PRIVATE PATIOS, TYP.
VEGETATED BASIN, TYP.
LOW WATER LANDSCAPE THROUGHOUT
DECORATIVE PAVING
TRELLIS AND TABLES
BUILT-IN BARBECUE
TURF AREA FOR PLAY AND PICNIC
TOT LOT WITH PLAY EQUIPMENT
FITNESS CIRCUIT
1 1
1 2
2 2
3 3
3 3
3 5
5 6
6 4
4 7
7 8
8 9
9 10
12 12
11 MIRAVALE PARCEL E A32
# 0047-09-RS18 CHARACTER VIGNETTES February 27, 2019
COMMUNITY PARK VIEW
260
LEGEND
SITE FEATURES AND AMENITIES
SANTA CLARA STREET
PRIVATE PATIOS, TYP.
VEGETATED BASIN, TYP.
LOW WATER LANDSCAPE THROUGHOUT
DECORATIVE PAVING
TRELLIS AND TABLES
BUILT-IN BARBECUE
TURF AREA FOR PLAY AND PICNIC
TOT LOT WITH PLAY EQUIPMENT
FITNESS CIRCUIT
1 1
1 2
2 2
3 3
3 3
3 5
5 6
6 4
4 7
7 8
8 9
9 10
12 12
11 MIRAVALE PARCEL E A33
# 0047-09-RS18
February 27, 2019
1/8” = 1’-0” (24X36 SHEET) 0 4 8 16 0 8 16 32
CHARACTER VIGNETTES 1/16” = 1’-0” (12X18 SHEET)
COMMUNITY GARDEN VIEW
261
MIRAVALE PARCEL E
AFFORDABLE HOUSING
E N T I T L E M E N T S r e v i s i o n , 0 3 / 2 8 / 2 4P r epar ed by T EN OV ER ST UDI O Miravale Parcel E - Affordable Housing brings 40 new residenital units for singles, couples and families to Soledad, CA. The design promotes human interaction and mental health through a tax-credit, 100% affordable developement providing on-site social services, a community room, fenced play yard with outdoor gathering areas as well as a live-in site manager. 262
539 Marsh Street
San Luis Obispo, CA
805.541.1010
[email protected]
MIRAVALE PARCEL E - AFFORDABLE HOUSING
S O L E D A D , C A
D A T E : 0 3 / 2 8 / 2 4 T1.0
PROJECT DESCRIPTION
Lot 5 - Affordable Housing proposes a revision to the multi-family component of the previously entitled Miravel Parcel E. The previous program provided for some inclusionary housing between two multi-family buildings on Lot 5. The revised program will provide 100% tax-credit affordable housing in a large-family mix within the same footprint as the two previously entitled buildings. The proposed scheme will increase the unit count from 26 to 40, by adding an additional story to Building A. The project will meet all TCAC requirements for large-family mix including but not limited to a community room, support staff offices, shared laundry facility and a protected kid play area. The project intends to utilize concessions and waivers under State Density Bonus Law in order to increase building height ,number of stories, and reduce parking requirements. The concessions and waivers are as follows: CONCESSIONS: Reduce required parking from 63 to 50 (21% reduction)WAIVERS: 1) Increase overall height in Building A from 25'-5.5 to XX 2) Increase allowed storeies in Building A from 2 to 3. The revised program seeks an Entitlement Revision Approval.
VICINITY MAP
PARKING REQUIRED USE UNIT COUNT (OR SF) PARKING FACTOR SPACES REQUIRED RESIDENTIAL STUDIO 2 1 2
1 BEDROOM 15 1 152 BEDROOM 13 2 263 BEDROOM 10 2 20REQUIRED TOTAL 63PROVIDED TOTAL 50 ADA SPACES USE # OF SPACES ADA FACTOR ADA REQUIRED
RESIDENTIAL 50 1 PER 25 2REQ'D TOTAL 2PROVIDED TOTAL 1 VAN, 1 STD
PARKING CALCULATIONS
3(57&$&
0,1 81,762)
%8,/',1* %' %'
%8,/',1*$ %8,/',1*$ 727$/
727$/81,76
678',2
%'
%'
%'
%8,/',1*$ 678',2 %' %' %' 727$/
),567)/225 6(&21')/225 7+,5')/225 727$/
%8,/',1*%
),567)/225 6(&21')/225
727$/
$//%/'*6 727$/
0$1$*(5
%'
02%,/,7<
0,15(4
'
'(9(/230(17$//<',6$%/('
5(4
'
727$/%$&&(66,%/(
&20081,&$7,21
0,15(4
'
81,7&2817
727$/81,76
2)727$/81,76
$'$352326('
$'$$&&(66,%/(81,76
5(48,5('$&&(66,%/(81,76
%'
CLIENTEDEN HOUSING22645 GRAND STREET, HAYWARD CA CONTACT: DIXIE [email protected] OVER STUDIO539 MARSH ST., SAN LUIS OBISPO, CA 93401805.541.1010CONTACT: Jessie [email protected] INFO & DATA T1.0SITE PLAN PREVIOUS & PROPOSED A1.0BUILDING A PREVIOUS & PROPOSED A2.0BUILDING B PREVIOUS & PROPOSED A2.1BUILDING A & B PROPOSED UPPER FLOOR PLANS A2.2PROPOSED UNIT LAYOUTS A2.3PROPOSED UNIT LAYOUTS - CONTINUED A2.4BUILDING A PREVIOUS & PROPOSED ELEVATIONS A3.0BUILDING B PREVIOUS AND PROPOSED ELVATIONS A3.1 MATERIAL & COLOR SELECTION A4.0
CONTACTSSHEET INDEX
/27
$31 29(5$//
&855(1786( 9$&$17
6) $&5(
0$;6,7(&29(5$*( $//2:$%/( 352326('
'(16,7< $//2:$%/( 7%' 352326('
$))25'$%/(81,76352326(' $))25'$%/(,1&(17,9(638568(' +(,*+7 6725<,1&5($6(
3$5.,1*5('8&7,21
+(,*+7/,0,7 $//2:$%/(
6725< 352326('
6725<
6725<
6(7%$&.6 $//2:$%/(
)5217
352326('
)5217 9$5,(60,1
6,'(
6,'(
5($5
5($5
/$1'86(5(48,5(0(176
=21,1*/276,=(
5+,*+'(16,7<5(6,'(17,$/
$''5(66352326('86( 08/7,)$0,/<+286,1*5$//2:('86(,1=21( <(6(17,7/(0(17686(3(50,75(48,5(' <(6 %8,/',1*$2&&83$1&< 5&216758&7,217<3( 7<3(%635,1./(56<67(0 56725,(6352326(' +(,*+7352326(' 8372 %8,/',1*$5($6)
)/225 6)
,1&/8'(6&29
'(;7(5,25(*5(66 &29
''(&.6
%8,/',1*%2&&83$1&< 5&216758&7,217<3( 7<3($635,1./(56<67(0 56725,(6352326(' +(,*+7352326(' 8372 %8,/',1*$5($6)
)/225 6)
,1&/8'(6&29
'(;7(5,25(*5(66 &29
''(&.6
%8,/',1*,1)2
263
539 Marsh Street
San Luis Obispo, CA
805.541.1010
[email protected]
MIRAVALE PARCEL E - AFFORDABLE HOUSING
S O L E D A D , C A
D A T E : 0 3 / 2 8 / 2 4 A1.0
K E Y P L A N
A R C H I T E C T U R A L S I T E P L A N
SC ALE: 1 ” = 50 ’ -0 ”
N
1. SIMILAR PARKING LAYOUT TO PREVIOUS DESIGN. ADDITIONAL TRASH AREA AND POTENTIAL TRANSFORMER LOCATION ADDED. FUTURE EASEMENT WILL PROVIDE ACCESS AN ACCESS TO LARGER DEVELOPMENT. 2. PARKING COUNT REDUCED FROM 54 TO 50 TO INCORPORATE A FENCED PLAY YARD FOR RESIDENTS, PER TCAC REQUIREMENTS. 3. BUILDING FOOTPRINTS REMAIN THE SAME IN OVERALL WIDTH AND DEPTH WITH MINOR CHANGES TO THE MASSING TO ACCOMODATE THE REVISED UNIT LAYOUT. P R O P O S E D S I T E P L A N N O T E S :
P R E V I O U S P R O P O S E D
264
539 Marsh Street
San Luis Obispo, CA
805.541.1010
[email protected]
MIRAVALE PARCEL E - AFFORDABLE HOUSING
S O L E D A D , C A
D A T E : 0 3 / 2 8 / 2 4 A2.0
SC ALE: 1 ” = 20 ’ -0 ”
P R E V I O U S B U I L D I N G A
F I R S T F L O O R P L A N
SC ALE: 1 ” = 20 ’ -0 ”
NN
P R O P O S E D B U I L D I N G A
F I R S T F L O O R P L A N
265
539 Marsh Street
San Luis Obispo, CA
805.541.1010
[email protected]
MIRAVALE PARCEL E - AFFORDABLE HOUSING
S O L E D A D , C A
D A T E : 0 3 / 2 8 / 2 4 A2.1
SC ALE: 1 ” = 20 ’ -0 ”
P R E V I O U S B U I L D I N G B
F I R S T F L O O R P L A N
SC ALE: 1 ” = 20 ’ -0 ”
NN
P R O P O S E D B U I L D I N G B
F I R S T F L O O R P L A N
266
539 Marsh Street
San Luis Obispo, CA
805.541.1010
[email protected]
MIRAVALE PARCEL E - AFFORDABLE HOUSING
S O L E D A D , C A
D A T E : 0 3 / 2 8 / 2 4 A2.2
SC ALE: 1 ” = 20 ’ -0 ”
N
P R O P O S E D B U I L D I N G B
S E C O N D F L O O R P L A N
P R O P O S E D B U I L D I N G A
N S E C O N D & T H I R D F L O O R P L A N
SC ALE: 1 ” = 20 ’ -0 ”
267
539 Marsh Street
San Luis Obispo, CA
805.541.1010
[email protected]
MIRAVALE PARCEL E - AFFORDABLE HOUSING
S O L E D A D , C A
D A T E : 0 3 / 2 8 / 2 4 A2.3
SC ALE: 1 /8 ” = 1 ’-0 ”
U N I T L A Y O U T S
UNI T 1A - ACCESSIBLE - 55 8 SF UNI T 2A - ACCES SIBLE - 71 0 SF UNI T 3 A - ACCESSIBLE - 97 8 SF UNI T 2B- ADAP TABLE - 7 0 6 S F 268
539 Marsh Street
San Luis Obispo, CA
805.541.1010
[email protected]
MIRAVALE PARCEL E - AFFORDABLE HOUSING
S O L E D A D , C A
D A T E : 0 3 / 2 8 / 2 4 A2.4
SC ALE: 1 /8 ” = 1 ’-0 ”
U N I T L A Y O U T S - C O N T .
UNI T ST UDI O- ADAP TABLE - 4 0 2 SF UNI T 3B - ADAP TABLE - 973 SF UNI T 3 C- ADAP TABLE - 1116 SF UNI T 1B - ADAP TABLE - 494 SF 269
539 Marsh Street
San Luis Obispo, CA
805.541.1010
[email protected]
MIRAVALE PARCEL E - AFFORDABLE HOUSING
S O L E D A D , C A
D A T E : 0 3 / 2 8 / 2 4 A3.0
P R E V I O U S B U I L D I N G A F R O N T E L E V A T I O N SC ALE: 1 /1 6 ” = 1’ -0 ”
P R o p o s e d B U I L D I N G A F R O N T E L E V A T I O N SC ALE: 1 /1 6 ” = 1’ -0 ”
270
539 Marsh Street
San Luis Obispo, CA
805.541.1010
[email protected]
MIRAVALE PARCEL E - AFFORDABLE HOUSING
S O L E D A D , C A
D A T E : 0 3 / 2 8 / 2 4 A3.1
P R E V I O U S B U I L D I N G b F R O N T E L E V A T I O N P R o p o s e d B U I L D I N G b F R O N T E L E V A T I O N SC ALE: 1 /1 6 ” = 1’ -0 ”
SC ALE: 1 /1 6 ” = 1’ -0 ”
271
539 Marsh Street
San Luis Obispo, CA
805.541.1010
[email protected]
MIRAVALE PARCEL E - AFFORDABLE HOUSING
S O L E D A D , C A
D A T E : 0 3 / 2 8 / 2 4 A4.0
P R E V I O U S L Y A P P R O V E D C O L O R S A N D M A T E R I A L S
P R O P O S E D C O L O R S A N D M A T E R I A L S
1.STUCCO 1: ROCK BOTTOM SW7062* (FROM COLOR SCHEME A)2.STUCCO 2: BALANCED BEIGE SW7073* (FROM COLOR SCHEME D)M A I N P A I N T C O L O R S : A C C E N T P A I N T C O L O R S :
3.HORIZONTAL SIDING & TRIM: PURE WHITE SW7005* (FROM COLOR SCHEME A)4.VERTICAL BOARD AND BATTEN: HALCYON GREEN SW6213* (FROM COLOR SCHEME B)5.DOOR COLOR: SPICY HUE SW6342* (FROM COLOR SCHEME B)6.ASPHALT SHINGLE ROOFING: BARKWOOD (FROM COLOR SCHEME D)ALL COLOR SELECTIONS TO BE “OR SIMILAR.” FINAL COLORS TO BE APPROVED AFTER ON-SITE MOCKUPS.
All proposed colors are pulled from the previously approved colors andmaterials shown above. 272