CITY COUNCIL REGULAR MEETING - OCTOBER 16, 2023 PAGE 1 OF 3
CITY COUNCIL REGULAR MEETING
Monday, October 16, 2023 at 5:00 PM
94 N. Washington Street, Sonora, CA 95370
(209) 532-4541
AGENDA
NOTICE IS HEREBY GIVEN that the Sonora City Council will have their regular meeting on Monday, October 16, 2023, at 5:00 PM in the City of Sonora Council Chambers located at 94 N. Washington Street Sonora, CA 95370.
THIS MEETING IS PHYSICALLY OPEN TO THE PUBLIC AND MEMBERS OF THE PUBLIC MAY PARTICIPATE IN THE MEETING VIA VIDEO CONFERENCING AT:
Zoom Meeting Link:
https://us06web.zoom.us/j/81193397821?pwd=UGdrRTcyaFFac3o0b2JQK2FmMTRyUT09 Dial: (669) 444-9171
Meeting ID: 811 9339 7821
Passcode: 906625
MEMBERS OF THE PUBLIC WILL BE GIVEN THE OPPORTUNITY TO PROVIDE COMMENTS.
THIS MEETING WILL BE LIVE STREAMED ON THE CITY'S WEBSITE AT www.sonoraca.com.
Written comments can be submitted to be included as part of the administrative record; they will not be read during the meeting. All comments must be received by 3:00 pm on the day of the noticed meeting and can be submitted to the City Clerk at 94 N. Washington Street Sonora, CA 95370, or via email to [email protected].
CLOSED SESSION - 4:00 PM
CALL TO ORDER
ROLL CALL
PUBLIC COMMENTS
ADJOURN INTO CLOSED SESSION
1. Conference with Legal Counsel – Anticipated Litigation - Initiation of litigation pursuant to paragraph (4) of subdivision (d) of Section § 54956.9: One (1) Potential Case; Doug White, City Attorney, Melissa Eads, City Administrator.
1 CITY COUNCIL REGULAR MEETING - OCTOBER 16, 2023 PAGE 2 OF 3
2. Conference with Legal Counsel – Anticipated Litigation - Initiation of litigation pursuant to paragraph (4) of subdivision (d) of Section § 54956.9: One (1) Potential Case; Doug White, City Attorney, Melissa Eads, City Administrator.
RECONVENE INTO OPEN SESSION
OPEN SESSION - 5:00 PM
REPORT OUT OF CLOSED SESSION
PLEDGE OF ALLEGIANCE
ROLL CALL
CITY CLERK’S REPORT ON AGENDA POSTING
APPROVAL OF THE AGENDA
PUBLIC COMMENT (NON-AGENDA ITEMS)
The public may address the Council on any item of public interest not otherwise on the agenda that is within the jurisdiction of the City. No action may be taken. Matters to be addressed may be referred to City Staff or placed on a subsequent meeting Agenda. Speakers are limited to a three (3) minute presentation. If participating via Zoom, please raise your hand using the Raise Your Hand feature or dial *9 (*6 to unmute).
PRESENTATIONS
3. Receive a presentation regarding the Main Drain Field Inspection and Condition Report, direct Staff to continue collaboration with CalTrans on improvements, and report back to the Council within 60 days; Dave Richard, Associate Vice President, Dewberry; Gerard Fuccillo, City Engineer.
4. Receive a presentation regarding Code Enforcement from CSG Consultants; Rachelle Kellogg, Community Development Director, Irma Gowin, Senior Code Enforcement Officer, CSG, and Daisy Gomar, the City’s assigned Code Enforcement Officer.
CONSENT CALENDAR
Items on the Consent Calendar are considered routine and will be voted on in one motion unless a Council member or member of the public has a question or wishes to discuss an item. In that case, the item will be removed from the Consent Calendar and considered separately.
5. Consider approval of disbursements in the amount of $171,030.21 for payroll, including employee salaries, employer and employee taxes, retirement contributions, miscellaneous voluntary employee deductions, holiday pay, and other adjustments, including retro-pay; Tracy Skelly, Administrative Services Officer.
6. Consider approval of Resolution No.10-16-2023-A to authorize the City Administrator to execute an agreement to purchase a Ravo 5 iSeries Street Sweeper; Chris Gorsky, Administrative Services Director.
UNFINISHED BUSINESS
2 CITY COUNCIL REGULAR MEETING - OCTOBER 16, 2023 PAGE 3 OF 3
7. Discussion and Community Engagement regarding the Sonora Police Department’s Annual Military Equipment Report and the Department’s Funding, Acquisition, or Use of Military Equipment; Turu VanderWiel, Police Chief.
NEW BUSINESS
8. Consider recommendation limiting the use of Zoom or other remote meeting attendance platforms during City Council meetings; Melissa Eads, City Administrator, Douglas White, City Attorney.
9. Consider authorization to advertise for public bid on the Woods Creek Park Basketball Court Project; Rachelle Kellogg, Community Development Director.
MONTHLY REPORTS
10. Receive the Sonora Administrative Services Department monthly report for August 2023; Chris Gorsky, Administrative Services Director.
11. Receive the Sonora Fire Department monthly report for September 2023; Aimee New, Fire Chief.
12. Receive the Sonora Police Department monthly report for September 2023; Turu VanderWiel, Police Chief.
13. Receive the Sonora Public Works Department monthly report for September 2023; Michael Lagomarsino, Public Works Supervisor.
COUNCIL MEMBER REPORTS
ADJOURNMENT
In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please contact the City Administrator at City Hall (209) 532-4541, [email protected]. Notification 48 hours prior to the meeting will enable the City to make reasonable arrangements to ensure accessibility to this meeting (28 CFR 35.102-35.104 ADA Title II).
Materials related to an item on this Agenda submitted to the City Council after distribution of the agenda packet are available for public inspection in the City Administrator’s Office at 94 N. Washington Street, Sonora, CA 95370 during normal business hours (8:00 am - 4:00 pm, Monday through Friday, excluding holidays). The agenda and supporting public documents are also available on our City website www.sonoraca.com listed under the agenda/minutes link on the Government page. 3 {CW132324.4}
CITY COUNCIL AGENDA REPORT
MEETING DATE: October 16, 2023
TO: City Council Members
FROM: Melissa Eads, City Administrator
SUBJECT: Main Drain Condition Assessment
RECOMMENDATION:
1. Accept Main Drain Field Inspection and Condition Report as complete.
2. Direct staff to continue to collaborate with Caltrans regarding funding/construction of short-term and long-term improvements
3. Direct staff to report back to Council within 60 days on implementation status.
BACKGROUND:
The Main Drain serves as the principal stormwater conveyance system for large areas southeast of Stockton Street and on either side of Washington Street, Stewart Street, and Restano Way. The Main Drain consists of approximately 1,200 ft of stacked rock (stone) tunnel, 650 ft of 18-inch high-density polyethylene (HDPE) pipe, 3,100 ft of 24- to 36-inch corrugated metal pipe (CMP), 75 ft of 36-inch reinforced concrete pipe (RCP), and 100 ft of concrete culvert. The stone tunnel component of the Main Drain is over 150 years old and is now located below SR-49, parking areas, buildings, and City streets.
The City contracted with Dewberry Engineers Inc. to conduct field inspections and to prepare a condition assessment report to provide options for repair, rehabilitation, or replacement of critical areas within the Main Drain.
DISCUSSION / ANALYSIS:
The assessment project was divided into two phases: 1) a confined space drone inspection of the lower Main Drain (stone tunnel) was conducted on 1 June 2023 and 2) a closed-circuit television (CCTV) inspection of the Main Drain storm drain pipelines was conducted on 10 July 2023. Results of the inspections were summarized in two technical memoranda which are included as appendices in the Summary Report that was provided to Council. The Summary Report provides more detail and information on the findings and recommendations. The following are key items for Council’s information.
The stone tunnel portion of the Main Drain appears to be in adequate condition considering the tunnel is over 150 years old. It should be noted that the drone was not able to access the full length of the rock lined tunnel. Four different locations with a total of approximately 145 feet were unable to be accessed.
The stone tunnel, however, is starting show its age. The drone inspections revealed five areas of collapse along the length of the stone tunnel. These areas are located as follows, and as indicated on Attachment 1 (Figure 3):
1. 40 ft north of Entry 1
2. 20 ft south of Entry 2
4 Item 3.
{CW132324.4}
3. 65 ft south of Entry 3
4. 85 ft south of Entry 5
5. 65 ft south of Entry 10
The first four of these collapse areas are minor in nature. The fifth collapse area is of concern because this section of failed tunnel is approximately 10 to 12 ft and the west wall and lid of the tunnel at this location are missing. It appears that only the arching effect of the soil above the tunnel is supporting Stockton Street/ SR-49. At this same location, settlement in the roadway above the tunnel can be seen and has been previously marked by the City as a location of potential tunnel failure. Because Caltrans currently has ongoing construction activities, including the use of heavy machinery and trucks occurring directly adjacent to this section of failed tunnel, a letter was forwarded to Caltrans on 2 June 2023, recommending the portion of the road above this section of collapsed tunnel be blocked off from traffic and this location of the tunnel be exposed and repaired in the very near future.
Fifteen improvements are recommended for rehabilitation or replacement of the Stone Tunnel (ST) or Storm Drain Pipelines (SDP) as follows, and as indicated on Attachment 2 (Figure 10):
Project
Designation Title Description
ST-1 West Stone Tunnel Rehabilitation Reconstruction of stone tunnel at collapsed areas and steel door replacement areas
ST-2 West Stone Tunnel Replacement Replacement of 250 ft of stone tunnel ST-3 East Stone Tunnel Rehabilitation Reconstruction of stone tunnel at collapsed areas and steel door replacement areas
ST-4 East Stone Tunnel Replacement Replacement of 200 ft of stone tunnel ST-5 Washington Street Stone Tunnel
Replacement
Replacement of 380 ft of stone tunnel
ST-6 Stone Tunnel Bypass Construction of 530 ft of 36-inch CMP SDP-1 Church Street/Stewart Street/ Stockton
Street Relief Storm Drain
Construction of 1,350 ft of 24-inch HDPE and 640
ft of 48-inch HDPE
SDP-2 Washington Street Relief Storm Drain –
Phase 1
Construction of 520 ft of 30-inch HDPE
SDP-3 William Street Storm Drain Replacement Replacement of 20 ft of 12-inch RCP SDP-4 Central Storm Drain Replacement Replacement of 150 ft of 36-inch CMP SDP-5 Washington Street Storm Drain
Replacement Phase 1
Replacement of 30 ft of 24-inch CMP
SDP-6 Stewart Street Storm Drain Rehabilitation Rehabilitation of 90 ft of 12- to 18-inch storm drain SDP-7 Washington Street Storm Drain
Replacement Phase 2
Replacement of 150 ft of 24-inch CMP
SDP-8 Stewart Street East Alley Relief Sewer Construction of 260 ft of 18-inch HDPE SDP-9 Washington Street Relief Storm Drain –
Phase 2
Construction of 440 ft of 24-inch HDPE
A 10-year capital improvement program (CIP) was developed considering the severity of the existing conditions of the various sections. The CIP is divided into four tiers of projects with Tier 1 focused on repairs/rehabilitation of collapsed sections of the stone tunnel and construction of relief storm drains to alleviate historical street flooding. Reconstruction of the stone tunnel below Stockton Street by Caltrans is assumed during Tier 1. Tiers 2-4 progressively upgrade the Main Drain on either side of Washington Street combined with storm drain pipeline improvements further south along Stewart Street and Washington Street. Complete replacement of the stone tunnel including bypassing of segments beneath buildings is accomplished at the end of Tier 4. 5 Item 3.
{CW132324.4}
Tier Project
Designation Title Timeline,years
1 ST-1 West Stone Tunnel Rehabilitation 1-2
SDP-1 Church Street/Stewart Street/Stockton Street Relief Storm Drain 1-2 ST-3 East Stone Tunnel Rehabilitation 1-2
2 ST-2 West Stone Tunnel Replacement 3-4
SDP-2 Washington Street Relief Storm Drain – Phase 1 3-4 SDP-3 William Street Storm Drain Replacement 3-4
SDP-4 Central Storm Drain Replacement 3-4
SDP-8 Stewart Street East Alley Relief Sewer 3-4
3 SDP-5 Washington Street Storm Drain Replacement - Phase 1 5-6 SDP-6 Stewart Street Storm Drain Rehabilitation 5-6
ST-4 East Stone Tunnel Replacement 7-8
SDP-9 Washington Street Relief Storm Drain – Phase 2 9-10 4 SDP-7 Washington Street Storm Drain Replacement - Phase 2 9-10 ST-5 Washington Street Stone Tunnel Replacement 9-10
ST-6 Stone Tunnel Bypass 9-10
Over the 10-year period, based on the findings from the recent inspections, the construction estimate for all projects is $9.6 million in today’s dollars. Estimates by project are located in the Summary Report.
The next steps in the implementation of the Main Drain improvements include the following:
1. Confirmation with Caltrans of the schedule for reconstruction of the stone tunnel beneath Stockton Street and possible collaboration on future storm drain improvements.
2. Preparation of a drainage study to determine the required conveyance capacity of the Main Drain during significant storm events. Sizing of the Main Drain to meet peak flow requirements.
3. Identification of funding sources for the recommended CIP.
4. Comprehensive mapping of the Main Drain to determine vertical/horizontal locations.
5. Development of preliminary engineering documents to more fully define project elements and to refine probable costs.
6. Preparation of environmental documents to support the drainage improvements.
FISCAL IMPACT:
Fiscal impact will be identified as fiscal year budgets and projects (engineering studies, environmental studies, engineering design, and construction) are scheduled as well as determining if any outside funding sources are available to the City.
ATTACHMENTS:
1. Attachment 1 (Figure 3) showing Stone Tunnel Route and Entry Points to Stone Tunnel for the Assessment
2. Attachment 2.(Figure 10) showing Implementation Plan locations 6 Item 3.
7 Item 3.
8 Item 3.
CITY OF SONORA
MAIN DRAIN FIELD INSPECTION
AND CONDITION ASSESSMENT
TECHNICAL MEMORANDUM 3.0R1
SUMMARY REPORT
October 2023
9 Item 3.
10 Item 3.
11 Item 3.
12 Item 3.
13 Item 3.
14 Item 3.
City of Sonora Main Drain Field Inspection and Condition Assessment Page i TM 3.0R1 Summary Report
October 2023 u:\50164767 - main drain insp-assmt - ci sonora\documents\tm3r1 summary report\2023-10 report.docx
CONTENTS
1.0 Summary of Background Information..............................................................................................3
2.0 Overview of Field Inspection Procedures........................................................................................6
3.0 Results of Main Drain Inspections....................................................................................................9
3.1 Stone Tunnel ...........................................................................................................................9
3.2 Storm Drain Pipelines..........................................................................................................21
4.0 Summary of Condition Assessment ................................................................................................21
4.1 Stone Tunnel .........................................................................................................................21
4.2 Storm Drain Pipelines..........................................................................................................22
5.0 Recommended Main Drain Improvements ...................................................................................26
5.1 Stone Tunnel .........................................................................................................................26
5.2 Storm Drain Pipelines..........................................................................................................27
5.3 Summary of Probable Construction Costs .......................................................................30
6.0 Implementation Plan .........................................................................................................................32
6.1 Phasing of Improvements ...................................................................................................32
6.2 Next Steps..............................................................................................................................34 Appendices
Appendix A Technical Memorandum 1.0R1 Field Inspection and Condition Assessment of Stone Tunnel
Appendix B Technical Memorandum 2.0R2 Field Inspection and Condition Assessment of Storm Drain Pipelines
15 Item 3.
City of Sonora Main Drain Field Inspection and Condition Assessment Page ii TM 3.0R1 Summary Report
October 2023 u:\50164767 - main drain insp-assmt - ci sonora\documents\tm3r1 summary report\2023-10 report.docx List of Tables
Table 1 City of Sonora Main Drain Field Inspection and Condition Assessment Summary Report Summary of Storm Drain Pipelines ...............................................................................4 Table 2 City of Sonora Main Drain Field Inspection and Condition Assessment Summary Report Summary of Probable Construction Costs for Recommended Improvements ...............................................................................................................................31 Table 3 City of Sonora Main Drain Field Inspection and Condition Assessment Summary Report Suggested Phasing of Improvements............................................................................32 List of Figures
Figure 1 Overall Layout of Main Drain.......................................................................................................2 Figure 2 Summary of Storm Drain Pipelines..............................................................................................5 Figure 3 Entry Points to Stone Tunnel .......................................................................................................7 Figure 4 Entry Points to Storm Drain System ...........................................................................................8 Figure 5 Areas of Collapse within Stone Tunnel .....................................................................................20 Figure 6 CCTV Inspection Results ............................................................................................................24 Figure 7 Storm Drain Pipeline System Areas of Concern......................................................................25 Figure 8 Phasing Plan for Recommended Improvements .....................................................................28 Figure 9 Recommended Storm Drain Pipeline Improvements.............................................................29 Figure 10 Implementation Plan ....................................................................................................................33 16 Item 3.
City of Sonora Main Drain Field Inspection and Condition Assessment Page 1 TM 3.0R1 Summary Report
October 2023 u:\50164767 - main drain insp-assmt - ci sonora\documents\tm3r1 summary report\2023-10 report.docx
CITY OF SONORA
MAIN DRAIN FIELD INSPECTION AND CONDITION ASSESSMENT
TECHNICAL MEMORANDUM 3.0R1
SUMMARY REPORT
October 2023
The Sonora Main Drain (Main Drain) serves as the principal stormwater conveyance system for large areas within the City of Sonora (City), southeast of Stockton Street (SR-49) and on either side of Washington Street, Stewart Street, and Restano Way. The Main Drain consists of approximately 1,200 ft of stacked rock (stone) tunnel, 650 ft of 18-inch high-density polyethylene (HDPE) pipe, 3,100 ft of 24-36 inch corrugated metal pipe (CMP), 75 ft of 36-inch reinforced concrete pipe (RCP), and 100 ft of concrete culvert. The stone tunnel component of the Main Drain is over 150 years old and is now located below a state highway (SR-49), parking areas, buildings, and City streets. The limits of the Main Drain are illustrated in Figure 1.
Certain limited sections of the stone tunnel have experienced collapses based on photographs compiled from authorized and unauthorized individuals accessing the Main Drain. Collapses of the sidewalls of the stone tunnel have prompted concerns regarding the overall integrity of the Main Drain and the possibility of a catastrophic failure of the system, particularly below SR-49. These concerns have been shared with Caltrans staff, resulting in a subsequent action by the City to initiate a field inspection and condition assessment of the Main Drain. The field inspection and condition assessment was accomplished in two stages. During Stage 1, a confined space drone inspection of the lower Main Drain including the stone tunnel was completed (see Appendix A). For the upper reaches of the Main Drain primarily consisting of pipelines, CCTV inspections were accomplished under Stage 2 (see Appendix B).
The City requested assistance from Dewberry Engineers Inc. (Consultant) to conduct the field inspections and to prepare a condition assessment report of the Main Drain which could then serve as a basis for possible repair, rehabilitation, or replacement options.
Utilizing the services of HRL LLC dba Hovrtek (Drone Operator), the Consultant completed Stage 1, a confined space drone inspection of the lower Main Drain on 1 June 2023, with the results of the inspection summarized in TM 1.0, Main Drain Field Inspection and Condition Assessment. TM 1.0 was submitted to the City on 6 July 2023.
The Consultant completed Stage 2, a closed circuit television (CCTV) inspection of the Main Drain storm drain pipelines on 10 July 2023 utilizing the services of 360 Pipelines Inspections, LLC (360 Pipelines). The results of the inspection were summarized in TM 2.0, Field Inspection and Condition Assessment of Storm Drain Pipelines. TM 2.0 was submitted to the City on 24 July 2023. 17 Item 3.
18 Item 3.
City of Sonora Main Drain Field Inspection and Condition Assessment Page 3 TM 3.0R1 Summary Report
October 2023 u:\50164767 - main drain insp-assmt - ci sonora\documents\tm3r1 summary report\2023-10 report.docx Both TM 1.0 and TM 2.0 were reviewed with City staff on 28 July 2023 with comments incorporated subsequently into TM 3.0, Summary Report for future action by the City. TM 3.0 was submitted to the City in August 2023. TM 3.0R1 reflects City comments and is organized as follows: 1) Summary of Background Information, 2) Overview of Field Inspection Procedures, 3) Results of Main Drain Inspections, 4) Summary of Condition Assessment, 5) Recommended Main Drain Improvements, 6) Implementation Plan. Each element is detailed below.
1.0 SUMMARY OF BACKGROUND INFORMATION
The original construction of the lower end of the Main drain followed the path of a drainage course discharging to Sonora Creek. The alignment of the lower end of the Main Drain falls within Caltrans right of way on Stockton Street (SR-49), crosses City properties, and lies within private properties on either side of Washington Street. Buildings have been constructed over the Main Drain with foundations designed to accommodate the stone tunnel. Elements of the Main Drain have collapsed in the past, most recently in 2019, and required replacement/reconstruction with concrete box culverts or CMP. Despite the age, the Main Drain continues to serve as the principal storm drain conveyance system to Sonora Creek with multiple connections to storm drain laterals and pipelines along Washington Street.
As shown in Figure 1, the network of storm drain pipelines upstream of the stone tunnel element of the Main Drain generally consists of three principal segments of 24- to 36-inch diameter pipelines along Washington Street, Stewart Street, and within private properties east of Stewart Street to Shepherd Street. The three segments converge at William Street with a single 36-inch pipeline connection to the stone tunnel in the rear parking lot of the Sonora Area Foundation Building.
Most of the storm drain pipelines are CMP with limited reaches of RCP and HDPE pipe. A summary of the storm drain pipelines is presented in Table 1 as designated in Figure 2. 19 Item 3.
City of Sonora Main Drain Field Inspection and Condition Assessment Page 4 TM 3.0R1 Summary Report
October 2023 u:\50164767 - main drain insp-assmt - ci sonora\documents\tm3r1 summary report\2023-10 report.docx TABLE 1
CITY OF SONORA MAIN DRAIN FIELD INSPECTION AND CONDITION ASSESSMENT
SUMMARY REPORT
SUMMARY OF STORM DRAIN PIPELINES
Segmenta Limitsa Size (inch) Material Length (ft)
A 5-3 15 CMP 113
B 5-6 24 CMP 100
C 7-6 24 CMP 150
D 7-8 24 CMP 204
E 8-9 24 CMP 45
F 35-9 24 CMP 605
G 36-35 18 x 18 Other 32
H 35-34 24 CMP 194
I 33-37 36 CMP 129
J 37-38 36 RCP 71
K 38-39 36 CMP 61
L 27-33 48 x 48 RCP 136
M 26-27 36 RCP 55
N 26-25 36 CMP 70
O 21-25 24 Segmented Block 140
P 20-20A 21 Segmented Block 132
Q 23-20 24 RCP 104
R 15-14 12 RCP 45
S 14-13 12 RCP 43
T 13-18 18 HDPE 312
U 18-19 18 HDPE 89
V 19-21 18 HDPE 121
W 30-40 8 Concrete Pipe (non-reinforced) 23
X 29-32 12 RCP 173
Y 25-11 21 CMP 586
a See Figure 2 for locations and limits of pipeline segments. 20 Item 3.
21 Item 3.
City of Sonora Main Drain Field Inspection and Condition Assessment Page 6 TM 3.0R1 Summary Report
October 2023 u:\50164767 - main drain insp-assmt - ci sonora\documents\tm3r1 summary report\2023-10 report.docx
2.0 OVERVIEW OF FIELD INSPECTION PROCEDURES
Visual inspection of the stone tunnel was accomplished by a drone piloted by HRL. The drone entered/exited the stone tunnel at multiple access points as illustrated in Figure 3. Although manned confined space inspection was not planned as part of the stone tunnel inspection, because some limited personnel entry at the access points might be required to facilitate the launching/retrieval of an inspection drone and a CCTV camera, a standby confined space rescue team was onsite during all inspection activities. The standby confined space rescue team, furnished by Rescue Solutions, consisted of two rescue technicians (fire department personnel) trained as CPR/EMS first responders and certified in confined space rescues. The confined space rescue team was equipped with ropes and hardware for anchoring and rigging retrieval lines, multi-pod Sked/Stokes litter, SCBA/supplied air, hard line communication, radios, air monitoring equipment, and ventilation fan. The confined space response team was prepared to implement the safety and rescue plan if required during an emergency.
City forces assisted in the removal of grates, storm drain manhole covers, inlet covers, and other obstructions that limited access to the stone tunnel. Any required right of entry to private property to access the stone tunnel was obtained by the City. The drone camera was monitored continuously by the drone pilot and a structural engineer from the Consultant. As the drone inspection work progressed, the structural engineer directed the drone pilot to stop at locations of concern (structure sloughing, blockage, damage, etc.) to mark the location and take additional video of that particular location. The intent of the video feed monitoring was to form an opinion of the overall condition of the tunnel and note the locations and number of areas of concern within the tunnel to determine the overall magnitude of the existing problems. Dimensions of the areas of concern were approximated but not physically measured. A video file of the stone tunnel inspection was created including accompanying narration to highlight key observations and comparisons to historical information regarding the stone tunnel condition.
Field inspections of storm drain pipelines were accomplished by 360 Pipelines using a CCTV camera. The periphery of each storm drain pipeline was televised using a pan and tilt resolution camera with 10x/12x digital zoom with automatic iris, 530 lines of resolution, and one lux sensitivity to light. The camera was attached to a six-wheel, steerable crawler with backeye camera for maneuvering past obstacles. Where sharp bends were encountered, a push/rod reel with high-resolution, digitally zoom 3x self-leveling axial color camera with shadow-less adjustable illumination up to 12K lux with footage counter was employed. Insertion of the CCTV camera into the storm drain system occurred at eleven locations as illustrated in Figure 4.
City forces assisted in the removal of grates, storm drain manhole covers, inlet covers, and other obstructions that limited access to the storm drain system. Any required rights of entry to private properties to access the storm drain were obtained in the City. 22 Item 3.
23 Item 3.
24 Item 3.
City of Sonora Main Drain Field Inspection and Condition Assessment Page 9 TM 3.0R1 Summary Report
October 2023 u:\50164767 - main drain insp-assmt - ci sonora\documents\tm3r1 summary report\2023-10 report.docx The CCTV inspection team included the 360 Pipelines Inspection Manager, City Engineer, Public Works crew, and Consultant. The City Engineer directed the 360 Pipelines Inspection Manager on what pipe alignments to survey depending on their age and usage history. No parking signs were posted in the areas of CCTV entry by the City prior to the inspection. The City Public Works crew was responsible for opening and closing the entry points of the drainage inlets and manholes. The Public Works crew also barricaded the area around the entry points and redirected traffic as required.
The 360 Pipelines Inspection Manager parked a van next to each opening and inserted the steerable crawler into the entry point. Depending on the pipe material, the steerable crawler had to exchange wheels ranging from largest to smallest. The 360 Pipelines Inspection Manager controlled the vehicle from their van through a computerized system. The 360 Pipelines Inspection Manager then documented the results of the inspection in an electronic, high-resolution MPG-4 color video recording including image files and a National Association of Sewer Service Companies (NASSCO) Pipeline Assessment Certification Program (PACP) defect coding database report. CCTV inspections occurred over a two-day period from July 10-11, 2023. The results of the CCTV inspection are discussed in the remaining sections of the TM.
3.0 RESULTS OF MAIN DRAIN INSPECTIONS
Inspections of the Main Drain stone tunnel and storm drain pipelines were conducted on 1 June and 10 July 2023, respectively. The results of the Main Drain inspections are discussed below.
3.1 Stone Tunnel
A brief summary of observations during the drone inspections for each segment is presented as follows. Minor and major collapses within the stone tunnel are highlighted in Figure 5. 25 Item 3.
City of Sonora Main Drain Field Inspection and Condition Assessment Page 10 TM 3.0R1 Summary Report
October 2023 u:\50164767 - main drain insp-assmt - ci sonora\documents\tm3r1 summary report\2023-10 report.docx
1. Tunnel between Entry 1 Entry 2
The drone inspection from Entry 1 to Entry 2 was approximately 100 ft long. Pipe crossings and pipe inlets were noted throughout the segment. About 40 ft from Entry 1 and 20 ft from Entry 2 there were minor rock collapsed areas. The collapse is near the top section of the wall and stones were missing.
Minor rock collapse about 40 ft from Entry 1
Minor rock collapse 20 ft from Entry 2
26 Item 3.
City of Sonora Main Drain Field Inspection and Condition Assessment Page 11 TM 3.0R1 Summary Report
October 2023 u:\50164767 - main drain insp-assmt - ci sonora\documents\tm3r1 summary report\2023-10 report.docx
2. Tunnel between Entry 2 Entry 3
The inspection area from Entry 2 to Entry 3 was approximately 73 ft long. The section included pipe inlets near the ceiling, HDPE pipe connecting to the drainage inlet, and cracks on the stone ceiling. A noteworthy section of the tunnel was the minor rock collapse 65 ft from Entry 3. The collapse was near the bottom half of the wall and segments of stones were missing.
Minor rock collapse 65 ft from Entry 3
27 Item 3.
City of Sonora Main Drain Field Inspection and Condition Assessment Page 12 TM 3.0R1 Summary Report
October 2023 u:\50164767 - main drain insp-assmt - ci sonora\documents\tm3r1 summary report\2023-10 report.docx
3. Tunnel between Entry 3 Entry 4
Inspection area from Entry 3 to Entry 4 was approximately 47 ft long. The stone tunnel section contained inlets near the ceiling and began to narrow at 30 ft from Entry 3. The drone could not fit through the narrow area and had to turn around. An additional stone tunnel was discovered 2 ft from Entry 4. The additional stone tunnel was significantly smaller than the main drain tunnel being about 1 ft by 1 ft. The additional stone tunnels appeared to serve drainage facilities along Washington Street.
Narrow rock tunnel area 30 ft from Entry 3
Entrance of an additional rock tunnel (1 ft x 1 ft) 2 ft from Entry 4 28 Item 3.
City of Sonora Main Drain Field Inspection and Condition Assessment Page 13 TM 3.0R1 Summary Report
October 2023 u:\50164767 - main drain insp-assmt - ci sonora\documents\tm3r1 summary report\2023-10 report.docx
4. Tunnel between Entry 4 Entry 5
The segment between Entry 4 and Entry 5 was approximately 85 ft long. There was an additional rock tunnel at the beginning of the entrance, about 1 ft in from the manhole. The rock tunnel was 1 ft by 1 ft. A rock collapse was evident about 85 ft from Entry 5.
Entrance of an additional rock tunnel (1 ft x 1 ft) 2 ft from Entry 4 Minor rock collapse 85 ft from Entry 5
29 Item 3.
City of Sonora Main Drain Field Inspection and Condition Assessment Page 14 TM 3.0R1 Summary Report
October 2023 u:\50164767 - main drain insp-assmt - ci sonora\documents\tm3r1 summary report\2023-10 report.docx
5. Tunnel between Entry 5 Entry 6
The segment between Entry 5 to Entry 6 was approximately 60 ft long. For a section of 20 ft from Entry 6, there are two sections sprayed with gunite forming a box culvert. An additional rock tunnel was found 12 ft from Entry 6.
Gunite area around stone tunnel creating box culvert south of Entry 6 Entrance of an additional rock tunnel (1 ft x 1 ft) 12 ft from Entry 6 30 Item 3.
City of Sonora Main Drain Field Inspection and Condition Assessment Page 15 TM 3.0R1 Summary Report
October 2023 u:\50164767 - main drain insp-assmt - ci sonora\documents\tm3r1 summary report\2023-10 report.docx
6. Tunnel between Entry 6 Entry 7
The inspection between Entry 6 and Entry 7 was approximately 80 ft long. The section contained pipe inlets, CMP pipes, and steel doors. About 30 ft from Entry 6 there are rusted/deteriorating steel doors on the ceiling of the tunnel. At 75 ft from Entry 7 there is a crack in the ceiling.
Rusted steel doors 30 ft of Entry 6
Crack on ceiling 75 ft from Entry 7
31 Item 3.
City of Sonora Main Drain Field Inspection and Condition Assessment Page 16 TM 3.0R1 Summary Report
October 2023 u:\50164767 - main drain insp-assmt - ci sonora\documents\tm3r1 summary report\2023-10 report.docx
7. Tunnel between Entry 7 Entry 8
The section between Entry 7 and Entry 8 was approximately 90 ft long. This section consisted of additional rusted steel doors, metal culverts along the ceiling, and tight sections that have gunite around the surface. Significant sections of the steel surface has deteriorated due to the abundance of rust damage. The Entry 8 is covered in gunite all over the stone walls. The gunite starts 1 ft from Entry 8 and continues for about 15 ft.
Rusted steel doors 1 ft from Entry 7
Gunite surface 1 ft south from Entry 8
32 Item 3.
City of Sonora Main Drain Field Inspection and Condition Assessment Page 17 TM 3.0R1 Summary Report
October 2023 u:\50164767 - main drain insp-assmt - ci sonora\documents\tm3r1 summary report\2023-10 report.docx
8. Tunnel between Entry 8 Entry 9
The inspection between Entry 8 to 9 was approximately 45 ft long. This section has pipe inlets and gunite on the surface. Pipe inlets were located 20 ft from Entry 8. Gunite covered the stone walls for approximately 15 ft beginning about 1 ft from Entry 8.
Pipe inlets on ceiling 20 ft from Entry 8
Gunite on stone wall surfaces 1 ft from Entry 8
33 Item 3.
City of Sonora Main Drain Field Inspection and Condition Assessment Page 18 TM 3.0R1 Summary Report
October 2023 u:\50164767 - main drain insp-assmt - ci sonora\documents\tm3r1 summary report\2023-10 report.docx
9. Tunnel between Entry 9 Entry 10
The section between Entry 9 to Entry 10 was approximately 92 ft long. This section consisted of a box culvert, timber wood on the surface, and a major stone tunnel collapse. The box culvert extended for about 26 ft starting 1 ft from Entry 10. Moist timber with water stains was on the surface 36 ft from Entry 10. The major stone tunnel collapse extended about 10 to 12 ft starting 65 ft from Entry 10. Stones covering the floor, the west wall, and the lid of the tunnel are missing and the soil is exposed.
Box culvert 1 ft from Entry 10
Moist timber with water stains on ceiling 36 ft from Entry 10 34 Item 3.
City of Sonora Main Drain Field Inspection and Condition Assessment Page 19 TM 3.0R1 Summary Report
October 2023 u:\50164767 - main drain insp-assmt - ci sonora\documents\tm3r1 summary report\2023-10 report.docx Major stone tunnel collapse 65 ft from Entry 10
Major stone tunnel collapse 65 ft from Entry 10
35 Item 3.
36 Item 3.
City of Sonora Main Drain Field Inspection and Condition Assessment Page 21 TM 3.0R1 Summary Report
October 2023 u:\50164767 - main drain insp-assmt - ci sonora\documents\tm3r1 summary report\2023-10 report.docx
3.2 Storm Drain Pipelines
The CCTV inspection of the storm drain pipelines was a collaborative effort of the 360 Pipelines Inspection Manager, City Engineer, City Public Works Department, and Consultant. While the Inspections Manager documented the condition of the pipelines, the Consultant recorded general observations along the pipeline alignments. In general, the storm drain system is in fair condition with a limited number of significant structural defects. A more detailed discussion of the pipeline condition assessment is found in the following section.
4.0 SUMMARY OF CONDITION ASSESSMENT
A condition assessment of the stone tunnel and storm drain pipeline components of the Main Drain follows below.
4.1 Stone Tunnel
Based on the drone inspections conducted in the field on 1 June 2023, the stone tunnel portion of the Main Drain appears to be in adequate condition considering the tunnel is over 100 years old. It should be noted that the drone was not able to access the full length of the rock lined tunnel. There were four locations where the tunnel was too narrow for the drone. These locations included:
1. 30 ft north of Entry 3
2. 47 ft south of the Entry 4
3. 26 feet north of Entry 4
4. 41 feet north of Entry 9
Over time, portions of the stone tunnel have been:
1. Replaced with a concrete box culvert at the segment between Entry 5 and Entry 6
2. Resurfaced with shotcrete between Entry 7 and Entry 8
3. Replaced with CMP north of Entry 9
4. Replaced with a concrete box culvert south of Entry 10 The stone tunnel is starting show its age. The drone inspections revealed five areas of collapse along the length of the stone tunnel. These areas were described previously and are located as follows:
1. 40 ft north of Entry 1
2. 20 ft south of Entry 2
3. 65 ft south of Entry 3
4. 85 ft south of Entry 5
5. 65 ft south of Entry 10
The first four of these collapse areas are minor in nature. The fifth collapse area is of concern because this section of failed tunnel is approximately 10 to 12 ft and the west wall and lid of the tunnel at this location are missing. At this location, it appears that only the arching effect of the soil above the tunnel is supporting Stockton Street/SR-49. At this same location, settlement in the roadway above the tunnel can be seen and has been previously marked by the City as a location of potential tunnel failure. Because Caltrans currently has ongoing construction activities, including the 37 Item 3.
City of Sonora Main Drain Field Inspection and Condition Assessment Page 22 TM 3.0R1 Summary Report
October 2023 u:\50164767 - main drain insp-assmt - ci sonora\documents\tm3r1 summary report\2023-10 report.docx use of heavy machinery and trucks occurring directly adjacent to this section of failed tunnel, Consultant submitted a letter to the City which was forwarded to Caltrans on 2 June 2023, recommending the portion of the road above this section of collapsed tunnel be blocked off from traffic and this location of the tunnel be exposed and repaired in the very near future.
In addition to the noted collapsed areas, there are also locations where old steel doors are supporting the top of the tunnel. These steel doors are located:
1. Between Entry 1 and Entry 2
2. Between Entry 6 and Entry 7
3. Between Entry 7 and Entry 8
These steel doors are showing a significant amount of corrosion.
There is also timber planking supporting the top of the tunnel just south of the concrete box culvert located south of Entry 10.
4.2 Storm Drain Pipelines
The findings from the CCTV investigation were compiled onto Figure 6. The investigation confirmed existing pipe diameter and conditions. Observations were graded using NASSCO PACP standards including the severity of any structural defects or operation and maintenance defects for each pipe segment. A grade was expressed with a letter followed by a digit. The letter represented -5.
A pipe
With the overall health of the system documented, areas of possible catastrophic failure were identified in Figure 6. Magenta segments
probably fail in 5-
attention, either the pipe has failed or likely to fail within the next five years according to NASSCO PACP.
As seen in Figure 7, the deteriorated condition of the following components of the storm drain pipe network are of concern:
a. 150 ft of 24-inch CMP northeasterly of the intersection of Washington Street and Restano b. 100-150 ft of 36-inch CMP north of William Street, upstream of the connection to the stone c. 20 ft of 12-inch RCP at the southeasterly corner of Stewart Street and William Street d. 50 ft of 18-inch HDPE along the westerly side of Stewart Street between William Street and 38 Item 3.
City of Sonora Main Drain Field Inspection and Condition Assessment Page 23 TM 3.0R1 Summary Report
October 2023 u:\50164767 - main drain insp-assmt - ci sonora\documents\tm3r1 summary report\2023-10 report.docx e. 40 ft of 12-inch RCP across Stewart Street, south of the intersection of Stewart Street and f. 30 ft of 24-inch CMP west of Washington Street, south of the intersection of Washington 39 Item 3.
40 Item 3.
41 Item 3.
City of Sonora Main Drain Field Inspection and Condition Assessment Page 26 TM 3.0R1 Summary Report
October 2023 u:\50164767 - main drain insp-assmt - ci sonora\documents\tm3r1 summary report\2023-10 report.docx
5.0 RECOMMENDED MAIN DRAIN IMPROVEMENTS
Based on the condition assessment documented earlier, repair, rehabilitation, and replacement options for the stone tunnel and storm drain pipelines are presented below.
5.1 Stone Tunnel
With the exception of the collapsed portion of the tunnel below Stockton Street/SR-49, there are not areas within the rock tunnel portion of the Main Drain that need immediate repairs. The City should, however, develop a plan to:
1. Repair the four additional collapsed portions of the tunnel
2. Replace the steel door lids and timber planking
3. Bypass the sections of the rock lined tunnel located below the various buildings
4. Replace the entire rock lined tunnel
A discussion of each recommendation follows below. The locations of recommended improvements are illustrated in Figure 8.
1. Collapsed Tunnel Repairs
The collapsed sections of the rock line tunnel should be repaired within the next two to three years. Most of the collapsed sections noted by the drone inspection are within a street or parking area and can be accessed from above grade. Because the repair work needed for these collapsed areas below grade would be confined space work and very difficult, these areas should be exposed from the ground and the collapsed section be replaced with either a concrete box culvert of similar hydraulic cross section to the tunnel or a reinforced concrete pipe culvert. As part of the repairs of these collapsed sections, the City should consider replacing the full segment of the rock lined tunnel between the adjacent Entry points. The full segment replacement may prove to be more economical in the long run for the full replacement of the rock lined tunnel.
2. Steel Door and Timber Planking Lid Replacement
The steel lids accessible from above grade should be replaced within the next two to three years.
These areas can be exposed from the ground and the steel doors and wood planking replaced with either concrete slabs that span over the rock lined tunnel or these sections of tunnel can be replaced with a concrete box culvert of similar hydraulic cross section or a reinforced concrete pipe culvert. As part of the replacement of these doors and wood planking, the City should consider replacing the full segment of the rock lined tunnel with a concrete box or pipe culvert between the adjacent Entry points. The full segment replacement may prove to be more economical in the long run for the full replacement of the rock lined tunnel.
3. Bypass Rock Lined Tunnel Below Buildings
The portions of the rock lined tunnel that passes below the adjacent buildings should be bypassed within the next five to ten years. The Main Drain passes below five buildings. At one of the crossings, the rock lined tunnel has been replaced with a concrete box culvert. The other crossings remain as a rock lined tunnel. Repairing or replacing these segments of the Main Drain would be difficult at best. As a result, these segments of the Main Drain should be bypassed with a new culvert that bypasses the storm water flow around each building. Once 42 Item 3.
City of Sonora Main Drain Field Inspection and Condition Assessment Page 27 TM 3.0R1 Summary Report
October 2023 u:\50164767 - main drain insp-assmt - ci sonora\documents\tm3r1 summary report\2023-10 report.docx bypassed, these sections of the existing rock lined tunnel would be filled with grout to prevent future collapse.
4. Full Rock Lined Tunnel Replacement
Due to the age of the rock lined tunnel portion of the Main Drain, the entire rock lined tunnel should be replaced within ten years. This would include replacing the portions of the tunnel that are not replaced as part of the first three repair recommendations. The more segments of the rock lined tunnel that are replaced as part of the first three repair recommendations will make this final recommendation more affordable.
5.2 Storm Drain Pipelines
For the areas of concern illustrated in Figure 7, the following recommendations are offered:
a. Pipelines to be removed and replaced:
1) 150 ft of 24-
2) 150 ft of 36-
3) 20 ft of 12-
4) 30 ft of 24-
b. Pipelines to be rehabilitated:
1) 50 ft of 18-
2) 40 ft of 12- e 2.
c. Storm drain relief pipelines to be constructed:
1) 440 ft of 24-inch HDPE along the easterly curb of Washington Street between William Street and Gold Street.
2) 520 ft of 30-inch HDPE along the easterly curb of Washington Street between Gold Street and Church Street.
3) 640 ft of 48-inch HDPE along the easterly curb of Washington Street between Church Street and Stockton Street and along the easterly curb of Stockton Street. 4) 1,190 ft of 24-inch HDPE along the westerly curb of Stewart Street between 470 Stewart Street and Church Street.
5) 160 ft of 24-inch HDPE in Church Street between Stewart Street and Washington Street.
6) 260 ft of 18-inch HDPE in alley east of Stewart Street.
Relief sewers are recommended to mitigate historical flooding and to reduce flows within certain segments of the stone tunnel. Storm drain pipeline improvements are illustrated in Figure 9. 43 Item 3.
44 Item 3.
45 Item 3.
City of Sonora Main Drain Field Inspection and Condition Assessment Page 30 TM 3.0R1 Summary Report
October 2023 u:\50164767 - main drain insp-assmt - ci sonora\documents\tm3r1 summary report\2023-10 report.docx
5.3 Summary of Probable Construction Costs
Recommended stone tunnel and storm drain pipeline improvements described previously are organized in the following projects:
1. Stone Tunnel (ST)
a. ST-1, West Stone Tunnel Rehabilitation
b. ST-2, West Stone Tunnel Replacement
c. ST-3, East Stone Tunnel Rehabilitation
d. ST-4, East Stone Tunnel Replacement
e. ST-5, Washington Street Stone Tunnel Replacement
f. ST-6, Stone Tunnel Bypass
2. Storm Drain Pipeline (SDP):
a. SDP-1, Church Street/Stewart Street/Stockton Street Relief Storm Drain b. SDP-9, Washington Street Relief Storm Drain Phase 1
c. SDP-3, William Street Storm Drain Replacement
d. SDP-4, Central Storm Drain Replacement
e. SDP-5, Washington Street Storm Drain Replacement Phase 1 f. SDP-6, Stewart Street Storm Drain Rehabilitation
g. SDP-7, Washington Street Storm Drain Replacement Phase 2 h. SDP-8, Stewart Street East Alley Relief Storm Drain
i. SDP-9, Washington Street Relief Storm Drain Phase 2
A summary of probable construction costs for the recommended projects is included in Table 2. 46 Item 3.
City of Sonora Main Drain Field Inspection and Condition Assessment Page 31 TM 3.0R1 Summary Report
October 2023 u:\50164767 - main drain insp-assmt - ci sonora\documents\tm3r1 summary report\2023-10 report.docx TABLE 2
CITY OF SONORA MAIN DRAIN FIELD INSPECTION AND CONDITION ASSESSMENT
SUMMARY REPORT
SUMMARY OF PROBABLE CONSTRUCTION COSTS FOR RECOMMENDED IMPROVEMENTS Project
Designation Title Description ProbableConstruction Cost, $ ST-1 West Stone Tunnel Rehabilitation Reconstruction of stone tunnel at collapsed areas and steel door
replacement areasa 400,000
ST-2 West Stone Tunnel Replacement Replacement of 250 ft of stone tunnel 1,625,000 ST-3 East Stone Tunnel Rehabilitation Reconstruction of stone tunnel at collapsed areas and steel door
replacement areas 400,000
ST-4 East Stone Tunnel Replacement Replacement of 200 ft of stone tunnel 1,360,000 ST-5 Washington Street Stone Tunnel
Replacement
Replacement of 380 ft of stone tunnel
2,580,000
ST-6 Stone Tunnel Bypass Construction of 530 ft of 36-inch CMPb 425,000
SDP-1 Church Street/Stewart Street/
Stockton Street Relief Storm
Drain
Construction of 1,350 ft of 24-inch
HDPE and 640 ft of 48-inch HDPEb
1,710,000
SDP-2 Washington Street Relief Storm
Drain Phase 1
Construction of 520 ft of 30-inch
HDPEb 390,000
SDP-3 William Street Storm Drain
Replacement
Replacement of 20 ft of 12-inch RCPb
10,000
SDP-4 Central Storm Drain Replacement Replacement of 150 ft of 36-inch CMPb 120,000
SDP-5 Washington Street Storm Drain
Replacement Phase 1
Replacement of 30 ft of 24-inch CMPb
20,000
SDP-6 Stewart Street Storm Drain
Rehabilitation
Rehabilitation of 90 ft of 12- to
18-inch storm drainc 45,000
SDP-7 Washington Street Storm Drain
Replacement Phase 2
Replacement of 150 ft of 24-inch
CMPb 100,000
SDP-8 Stewart Street East Alley Relief
Sewer
Construction of 260 ft of 18-inch
HDPEb 160,000
SDP-9 Washington Street Relief Storm
Drain Phase 2
Construction of 440 ft of 24-inch
HDPEb 290,000
a Construction of 3 ft by 3 ft box culvert is assumed for stone tunnel rehabilitation or replacement. Construction of box culvert estimated at $6,500/ft.
b Installation cost of storm drain pipelines estimated as follows:
24-inch CMP: $700/LF
36-inch CMP: $800/LF
18-inch HDPE: $600/LF
24-inch HDPE: $650/LF
30-inch HDPE: $750/LF
48-inch HDPE: $1,300/LF
12-inch RCP: $450/LF
c Pipeline rehabilitation cost: $500/LF
47 Item 3.
City of Sonora Main Drain Field Inspection and Condition Assessment Page 32 TM 3.0R1 Summary Report
October 2023 u:\50164767 - main drain insp-assmt - ci sonora\documents\tm3r1 summary report\2023-10 report.docx
6.0 IMPLEMENTATION PLAN
Based on the results of the field inspections and condition assessment, thirteen improvement projects were identified for the Main Drain. A suggested implementation plan is summarized below including a discussion of phasing of improvements and possible next steps.
6.1 Phasing of Improvements
A ten-year capital improvement program (CIP) is recommended to complete the Main Drain improvements. The CIP is divided into four tiers of projects with Tier 1 focused on repairs/rehabilitation of collapsed sections of the stone tunnel and construction of relief storm drains to alleviate historical street flooding. Reconstruction of the stone tunnel below Stockton Street by Caltrans is assumed during Tier 1. Subsequent Tiers 2-4 progressively upgrade the Main Drain on either side of Washington Street combined with storm drain pipeline improvements further south along Stewart Street and Washington Street. Complete replacement of the stone tunnel including bypassing of segments beneath buildings is accomplished at the end of Tier 4. The various tiers and projects are illustrated in Figure 10 and summarized in Table 3.
TABLE 3
CITY OF SONORA MAIN DRAIN FIELD INSPECTION AND CONDITION ASSESSMENT
SUMMARY REPORT
SUGGESTED PHASING OF IMPROVEMENTS
Tier Project
Designation Title Timeline,years
1 ST-1 West Stone Tunnel Rehabilitation 1-2
SDP-1 Church Street/Stewart Street/Stockton Street Relief Storm Drain
1-2
ST-3 East Stone Tunnel Rehabilitation 1-2
2 ST-2 West Stone Tunnel Replacement 3-4
SDP-2 Washington Street Relief Storm Drain Phase 1 3-4
SDP-3 William Street Storm Drain Replacement 3-4
SDP-4 Central Storm Drain Replacement 3-4
SDP-8 Stewart Street East Alley Relief Sewer 3-4
3 SDP-5 Washington Street Storm Drain Replacement - Phase 1 5-6 SDP-6 Stewart Street Storm Drain Rehabilitation 5-6
ST-4 East Stone Tunnel Replacement 7-8
SDP-9 Washington Street Relief Storm Drain Phase 2 9-10 4 SDP-7 Washington Street Storm Drain Replacement - Phase 2 9-10 ST-5 Washington Street Stone Tunnel Replacement 9-10
ST-6 Stone Tunnel Bypass 9-10
48 Item 3.
49 Item 3.
City of Sonora Main Drain Field Inspection and Condition Assessment Page 34 TM 3.0R1 Summary Report
October 2023 u:\50164767 - main drain insp-assmt - ci sonora\documents\tm3r1 summary report\2023-10 report.docx
6.2 Next Steps
Initial steps in the implementation of the Main Drain improvements include the following:
1. Confirmation with Caltrans of the schedule for reconstruction of the stone tunnel beneath Stockton Street and possible collaboration on future storm drain improvements.
2. Preparation of a drainage study to determine the required conveyance capacity of the Main Drain during significant storm events. Sizing of the Main Drain to meet peak flow requirements.
3. Identification of funding sources for the recommended CIP.
4. Comprehensive mapping of the Main Drain to determine vertical/horizontal locations.
5. Development of preliminary engineering documents to more fully define project elements and to refine probable costs.
6. Preparation of environmental documents to support the drainage improvements. 50 Item 3.
CITY COUNCIL AGENDA REPORT
MEETING DATE: October 16, 2023
TO: City Council Members
FROM: Rachelle Kellogg, Community Development Director
SUBJECT: Code Enforcement Presentation
RECOMMENDATION
Receive a Code Enforcement presentation from CSG Consultants.
DISCUSSION
The City’s Code Enforcement activities are overseen by the Community Development Director through consulting services provided by CSG Consultants. Irma Gowin, Senior Code Enforcement Officer for CSG and the City’s assigned Code Enforcement Officer, Daisy Gomar, will be presenting to the City Council and the public a presentation introducing the functions/activities of Code Enforcement.
FISCAL IMPACT
None
ATTACHMENTS
1) Code Enforcement Presentation
51 Item 4.
CITY COUNCIL AGENDA REPORT
MEETING DATE: October 16, 2023
TO: Honorable Mayor and Members of the City Council
FROM: Tracy Skelly, Administrative Services Officer
SUBJECT: Disbursements in the amount of $171,030.21 for payroll
RECOMMENDATION
Consider approval of disbursements in the amount of $171,030.21 for payroll, including employee salaries, employer and employee taxes, retirement contributions, miscellaneous voluntary employee deductions, holiday pay, and other adjustments, including retro-pay.
DISCUSSION
This payroll was the first (1
st) payroll of the month, which was an expected amount.
This payroll is the 7
th payroll of 26 for FY23-24, we would have expected to expend 26.92% of the budgeted amount. In total, we have expended 25.07% of the Salaries and Wages for the FY 23-24 budget.
FISCAL IMPACT
Disbursements are part of the approved FY23-24 Budget.
52 Item 5.
CITY COUNCIL AGENDA REPORT
MEETING DATE: October 16, 2023
TO: City Council Members
FROM: Chris Gorsky, Administrative Services Director
SUBJECT: Consider approval of Resolution No. 10-16-2023-A, a Resolution of the City Council of the City of Sonora Authorizing the City Administrator to execute an agreement to Purchase a Ravo 5 iSeries Street Sweeper.
RECOMMENDATION
Staff recommends the City Council consider approval of Resolution No.10-16-2023-A, a resolution of the City Council of the City of Sonora to authorize the City Administrator to execute an agreement to purchase a Ravo 5 iSeries Street Sweeper. The City can purchase the sweeper outright or enter into a lease-purchase agreement, staff recommends the City purchase the sweeper outright and save $38,891 in interest.
Purchase for an estimated total of $309,379.
Lease-purchase for an annual budgeted amount of $116,090 for three years with 6.16% interest, at the end of the three years the City will own the equipment without any additional costs.
DISCUSSION
The City’s current street sweeper is at its end of life. The sweeper has been in constant use for more than twenty years, purchased in 2001, and now has issues with rust and holes, has had chronic hydraulic leaks, and non-functional air conditioning. The equipment has required extensive annual servicing, is constantly out of service and will soon be non-compliant with the State of California’s Air Resources Board (CARB) regulations for diesel engines in support of their clean air goals. The current sweeper will be surplused as soon as it is replaced.
53 Item 6.
Staff has reviewed what is needed by the City and had a demonstration of the proposed street sweeper, the Ravo 5 iSeries Compact Sweeper, see brochure for more information. This has all the features needed, including a larger hopper than the current unit. Some of the improved features include air conditioning, very low noise levels, a fine dust filtration system and a 360-degree camera for safety. The quote includes all setup and training. The vendor is in Sacramento and will provide maintenance and any warranty work at our facility. As with the new leased patrol vehicles, the annual maintenance is expected to be much less than the more than twenty-year-old equipment the City operated in the past. Annual maintenance is expected to be a fraction of what the City has spent on the current sweeper.
Street sweeping keeps city streets looking well-kept by collecting and removing paper, leaves, and other debris that collect in gutters and streets. This minimizes the risks of blocked storm water facilities that may result in localized flooding during heavy rains. The City also sweeps Highway 49 and is reimbursed by the State for this service. The current reimbursement is approximately $9,300 annually.
FISCAL IMPACT
The Street Sweeper was sourced through a Sourcewell contract. Sourcewell is a service cooperative that was established with the statutory purpose of assisting public agencies in meeting specific needs which are more efficiently delivered cooperatively than by an entity individually. Sourcewell is authorized to establish competitively awarded cooperative purchasing contracts on behalf of itself and its participating agencies. Sourcewell follows the competitive contracting law process to solicit, evaluate, and award cooperative purchasing contracts for goods and services.
There is no impact to the General Fund. The funding for the Street Sweeper is funded by Measure I revenues, which is the ½ cent special sales tax passed by City Voters in 2004. These funds were specifically to provide funding to replace aging Public Works equipment. As of October 1, 2023, there is $521,176 available in the Public Works Measure I account. The Street Sweeper has a price of $309,378.55, of this amount $154,000 was budgeted for in the current FY23/24 budget requiring an additional budget change of $155,379 in order to purchase the equipment outright.
ATTACHMENTS
Resolution 10-16-2023-A
Sourcewell Quote and Leasing information.
Street Sweeper Brochure.
54 Item 6.
RESOLUTION No. 10-16-2023-A
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SONORA AUTHORIZING
THE CITY ADMINISTRATOR TO EXECUTE AN AGREEMENT TO PURCHASE A
RAVO STREET SWEEPER
WHEREAS, the Public Works Department has validated its need for a replacement street sweeper based on the current unit being at its end of life; and WHEREAS, the purchase will be made through a Sourcewell contract, which is an authorized competitively awarded cooperative purchasing agreement to award a contract to Municipal Maintenance Equipment; and
WHEREAS, there are sufficient funds available in the Measure I Public Works fund, the City’s ½ cent sales tax fund, that was specifically passed to provide equipment replacement for the Public Works Department; and
WHEREAS, staff recommends the purchase of the Ravo iSeries Street Sweeper:
NOW THEREFORE, BE IT RESOLVED, that the City Council of the City of Sonora does hereby approve Resolution No. 10-16-2023-A authorizing the City Administrator to execute the agreement for a new Ravo Street Sweeper.
PASSED, APPROVED, AND ADOPTED as a Resolution by the Sonora City Council at a meeting held by the City Council on the 16th day of October 2023, by the following vote:
AYES: ________________________________________
NOES: ________________________________________
ABSTAIN: ________________________________________
ABSENT: ________________________________________
Mark Plummer, Mayor
ATTEST:
Tracy Skelly, City Clerk, City of Sonora
55 Item 6.
56 Item 6.
57 Item 6.
58 Item 6.
59 Item 6.
60 Item 6.
RAVO 5 iSeries
61 Item 6.
2 RAVO 5 iSeries - Model year 2019
In 1964, when RAVO was established in The Netherlands, the foundation for the first compact vacuum street sweeper was laid.
Since then RAVO has grown into the world leader in innovative sweeping. Nowadays we are part of the Fayat Environmental Solutions Group providing a complete sweeping solution for customers all over the world.
Our international dealer network allows us to provide superior service to customers worldwide. These customers include cities like Rome, Amsterdam, Dubai, Saint Petersburg, Washington DC, Berlin, Montreal, San Francisco, Porto and Bordeaux.
RAVO successfully supports customers to find solutions for modern day issues. RAVO has helped Rome to lower the noise emission of its sweepers by developing a special silent package.
The city of Barcelona needed a sweeper that could sweep and wash simultaneously; RAVO developed the swasher option and currently we are very excited about our latest development, the 5 eSeries, being the first electric compact sweeper in the market.
RAVO values close relationships with its customers;
With support and high service RAVO helped Berlin to achieve a longer uptime. These relationships and our one product focus has made the RAVO 5 iSeries into what it is today: World’s best and most sold street sweeper.
And not without reason, RAVO delivers at all levels; whether it is about the incredible uptime, fuel savings compared to truck mounted sweepers, operator’s comfort or the state of the art build quality. We will keep on going that extra mile to make the RAVO 5 iSeries to what it has become today: the benchmark in sweeping.
OVER 50 YEARS OF EXPERIENCE
PASSIONATE ABOUT SWEEPING
62 Item 6.
RAVO 5 iSeries - Model year 2019 3
DESIGNED TO PERFORM
THE RAVO 5 iSERIES
A SOLID FOUNDATION
Equipped with a powerful engine, an attractive cabin interior design and a state of the art intelligent sweeper monitoring system the 5 iSeries sets the benchmark in sweeping.
The unmatched performance is the result of a pure vacuum suction line combined with RAVO’s unique brush system.
Spring or Autumn, sand with pine needles or leaves, main streets or bicycle lanes, smooth tarmac or cobblestones, the 5 iSeries will clean every street in one pass. Storing all debris in its spacious 5 cubic meter stainless steel hopper with an unrivalled compaction rate.
Every RAVO is standard equipped with:
• An ergonomically designed cabin with adjustable steering column, dashboard, arm rest and lockable doors from inside. • Air conditioning.
• A powerful IVECO or Cummins engine.
• Linde hydraulics.
• A stainless-steel container with a volume up to 5m3
.
• Loading capacity of 5500 KG.
• Extreme manoeuvrability with a turning circle of
only 5m (curb to curb).
• A unique pulled brush system:
- Constant brush pressure extends the brush life with 50%. - Maintenance friendly: no greasing required.
• Hydraulic front suspension with automatic levelling system. • Only 15 easy accessible greasing points on the whole machine. • Stainless steel suction tube.
• High waste compaction rate.
• Wide suction tube (225 mm).
63 Item 6.
4 RAVO 5 iSeries - Model year 2019
At RAVO we continuously improve and develop our products.
The RAVO intelligent electronic monitoring system, which we named the iSystem, is an excellent example of our innovation power. It has been specially developed to be in full control of your sweeper.
This robust control system has been tested exhaustively to meet the high RAVO standards. The use of nodes guarantees stability and the build in LCD screen enables you to check the parameters of the electronical & hydraulic system.
This system will ease maintenance of your machine by
informing you the status of the functionalities of your sweeper.
At one glance you can view all functions of the sweeper.
Via the various available screens you can for example keep track of your sweeping and engine hours, service intervals or check your hydraulic system, lights, gauges, various pressure and voltage levels, etc.
THE RAVO iSYSTEM:
INTELLIGENCE MEETS CONVENIENCE
Sweeping mode
Diagnostic mode Info mode Parameter mode
64 Item 6.
RAVO 5 iSeries - Model year 2019 5
THE CABIN ATTRACTIVE
& COMFORTABLE
The cabin has been designed with the input of experienced international RAVO operators. When entering the cabin
with a floor height of only 78 cm, you will notice the ample interior space. Once seated in the air ride operator’s seat the logical layout of the dashboard will amaze you. Add to that the fully adjustable armrest and steering wheel, the slightly tilted panoramic windscreen for ultimate visibility and you will agree that new standards have been set.
These standards include:
• iSystem.
• Sound isolation.
• Panoramic view.
• Adjustable steering column, dashboard and arm rest.
• Lockable doors from inside for safety of the driver.
• Rear view and suction mouth camera.
• Air-conditioning.
• 12V plug.
• Radio with MP3 and USB.
• 2 Cup holders.
• Lockable storage space.
• Hatch to see inside the hopper.
EASE OF MAINTENANCE
To ensure proper maintenance of the machine in a smart way the RAVO 5 iSeries comes with the following features:
• RAVO’s unique maintenance friendly brush system.
• Fan cleaner.
• Two big service doors for easy access.
• Easy changeable brushes.
• Optional electrical lowerable grid inside the hopper. • Optional high-pressure water pump
• Long lasting water spray nozzles.
• Easy accessible greasing points.
65 Item 6.
6 RAVO 5 iSeries - Model year 2019
RAVO 5 iSeries,
INNOVATION
KEEPS YOU GOING
66 Item 6.
RAVO 5 iSeries - Model year 2019 7 67
Item 6.
8 RAVO 5 iSeries - Model year 2019 68
Item 6.
RAVO 5 iSeries - Model year 2019 9
Container dump
This option allows you to dump your debris directly into a container and has a dumping height of 1550 mm.
Third brush/Weed cutter
The third brush increases the sweeping range of the RAVO 5 iSeries. This option enables drivers to clean pavements and road gutters more efficiently. When used in combination with the weed cutter brush, it is extremely suitable for the environmental friendly removal of weeds. This option can be equipped with a ‘quick release’ feature, which allows quick removal or installation of the third brush.
SAIGA PM 2.5 fine dust filtration system
The innovative and patented SAIGA Particle System has been TÜV PM 2.5 certified. This means that the RAVO sweeper will filter all fine dust out of the outgoing air. Contributing to a cleaner environment wherever you sweep.
Heavy duty suction line
Equip your sweeper with a coated suction line to extend its lifetime when working under the heaviest conditions.
High pressure water pump
The high-pressure water pump feature is perfect for quickly cleaning the inside of the container, brush and suction system or street furniture.
Brush angle adjustment
With the brush angle adjustment, you can position the brushes into the optimal angle to sweep gutters, which makes sweeping more efficient.
Independent brush lifting
The independent brush lifting enables you to reduce brush wear and achieve a longer lifetime of the brushes.
Swasher installation
Sweep and spray roads and pavements in just one go.
The pressurized swasher allows sweeping crews to clean the most difficult reachable places, street furniture and traffic signs.
Various configurations in terms of water pressure, water tanks and pumps are available.
Water recycling (improved, easy to clean)
This option doubles your action radius and reduces dust emission at the same time.
Wander hose
The wander hose is perfect for sucking up leaves and for emptying gutters and waste bins.
Silent package
The silent package reduces the noise level of the RAVO 5 iSeries by 15%. The package includes special software, sound absorbing materials and special silent brushes.
Cruise control
Set the speed to a certain level while sweeping so the operator can fully concentrate on the road and his sweeping job. 360 Degree view camera
RAVO values safety and is therefore proud to present this new option for even better views of the road around the sweeper.
A VERSATILE PERFORMER
For those who need specific requirements RAVO offers a range of options to customize your RAVO 5 iSeries. Below are some examples of the available options. 69 Item 6.
10 RAVO 5 iSeries - Model year 2019
Together with our certified and dedicated dealer network we help you exceed your expectations and overcome all
challenges.
We know that your equipment must work 24/7. To proof our trust in the quality of our product we offer a standard warranty of two years or 2000 hours on every sweeper that leaves our factory. On top of that we offer a 5-year warranty on the container and chassis.
RAVO: YOUR PREFERRED PARTNER
IN SWEEPING SOLUTIONS
RAVO 5 iSeries:
MADE IN HOLLAND
Being Europe’s number one producer of street sweeping machines and having over 50 years of experience makes RAVO a true specialist in the sweeping branch.
We have the know-how and skills to meet your wishes. The RAVO 5 iSeries is build according to Dutch standards; high quality, robustness, superior technology and innovative design.
70 Item 6.
Genuine RAVO parts are produced according to the highest standards of quality, durability and performance that is why they are such a good match for your RAVO sweeper.
To assure you always have the right parts available for scheduled service we have composed various service and
parts kits, it’s that easy!
Using RAVO Genuine Parts means:
• Receiving 12 Months warranty on parts.
• Meeting the OEM specifications.
• Increase the lifetime of your RAVO sweeper.
• Always the right fit.
• Cost savings over the long run.
For more information you can contact your local dealer who has RAVO trained parts specialists with the right knowledge and experience to assist you. They can further inform you about the possibilities of full service contracts and other service and maintenance options.
RAVO GENUINE PARTS,
DESIGNED TO FIT!
RAVO ACADEMY
Training & education is highly valued by RAVO. Whether it is training of our employees and dealers or your operators and engineers. We have different training programs which are available at our own training facility. This is the RAVO Academy.
The RAVO academy enables our dealers and their customers to use and maintain the RAVO sweepers in the most efficient way. This high-quality training facility at the RAVO factory in Alkmaar provides trainings on different skill levels.
Our professional RAVO trainers also offer training on location, either at the dealer or at the customer.
Contact your local dealer for more information regarding the training possibilities.
11 RAVO 5 iSeries - Model year 2019 71
Item 6.
RAVO 5 iSeries - Model year 2019 12
RAVO 5 iSeries TECHNICAL SPECIFICATIONS
Suction system
Airflow capacity
Suction nozzle dimensions l x w
Suction nozzle material
Suction tube diameter
Suction tube material
Brush system
Type
Available brush diameter
Brush rotation speed
Well-being
Noise emission Lwa
Noise level operator seat Lpa Euro 6/Tier 4
Brakes & Electricity
Front brakes
Rear brakes
Front suspension
Rear suspension
Battery
Alternator
Voltage (V)
Maintenance
Container Material
Total amount of greasing points in sweeper
Warranty
Optional Equipment
Max. sweeping width incl. third brush
Wander hose
Third brush / Weed cutter
Silent package Lwa
High pressure water pump
Camera
Extra water capacity
Heavy duty suction line
14.000 m3/h
112 x 630 mm
Corten steel (optional linatex lining available)
225 mm
Stainless Steel (optional linatex lining available)
RAVO maintenance free pulling brush system
750 mm - 900 mm
0 - 210 rpm
109 dBA
74 dBA / 76 dBA
Hydraulically operated disk brakes
Hydrostatic hydraulically actuated servo drum brakes
Independent hydro-pneumatic suspension
Rubber cone springs
2 x 12 V/Ah
90 amperes
24 with running engine 28
Stainless Steel inside / ABS cover outside
15 2 years or 2000 engine hours whichever comes first
3400 mm
200 mm diameter
750 mm diameter / 900 mm diameter
97 dBA
15 L per min. @ 150 bar
Suction mouth, side view and rearview
Up to 1250 Liter
-
Our machines are equipped with engines which comply with the most stringent emissions legislations. The RAVO 5 iSeries engines are available in Tier 3, Tier 4 and Euro 6.
RAVO 5 iSeries
ENGINES
Engine & Drive system
Displacement
Maximum torque
Maximum power
Engine type
Speed (per hour)*
RAVO drive type and drive line system
Emission level Tier 3
4.5 L
560 Nm @ 1400 rpm
104 kW @ 2200 rpm
Iveco Diesel 4 Cylinder
25 - 60 km
Emission level Euro 6
4.5 L
580 @ 1250-1940 rpm
118 kW @ 2500 rpm
Iveco Diesel 4 Cylinder
25 - 80 km
Emission level Tier 4 final
3.8 L
360 lb.ft @ 1600 rpm
138 hp @ 2300 rpm
Cummins QSF3.8 Diesel 4 Cyl.
25 - 60 km
Linde / Hydrostatic Continuously Variable
*Depending on local legislation.
72 Item 6.
RAVO 5 iSeries - Model year 2019 13
RAVO 5 iSeries DIMENSIONS, WEIGHT, CAPACITIES
Volume 5 m3
Dumping height 850 mm
Min. total empty weight (curb weight)* 5950 kg
Max. payload* 5450 kg
Dimensions, Weight, Capacities
Length
Width incl mirrors
Wheelbase
Sweeping width
Gradeability [%]
Gross vehicle weight
Capacity fuel tank
Capacity water tank
Turning distance curb to curb*
Emission level Tier 3/Tier 4 final
4525 mm
2280 mm
1816 mm
2200 - 2500 mm
Up to 30%
11400 kg
105 l
600 l
Emission level Tier 3
Emission level Euro 6
4625 mm
2280 mm
1916 mm
2200 - 2500 mm
Up to 30%
11400 kg
120 l
600 l
Tipping
Container dump
Dimensions
Height: 2510 mm
Length Tier 3 and Tier 4: 4525 mm Length Euro 6: 4625 mm Height: 2700 mm
Length Tier 3 and Tier 4: 4525 mm
Length Euro 6: 4625 mm Width incl mirrors: 2280 mm
Volume 4 m3
Dumping height 1550 mm
Min. total empty weight (curb weight)* 6220 kg
Max. payload* 5180 kg
Dumping height: 1550 mm
Dumping height: 850 mm
Every effort has been made to ensure that the information in this brochure is accurate. RAVO B.V. is not responsible for printing or clerical errors.
Container dump Standard
*Depending on model.
5070 mm
73 Item 6.
Dealer Stamp
RAVO B.V.
P.O. Box 286, 1800 AG Alkmaar
Otterkoog 1, 1822 BW Alkmaar
The Netherlands
T +31 (0) 72 567 32 32
F +31 (0) 72 567 32 00
www.ravo.fayat.com
Brochure version 201901
EURO6
74 Item 6.
CITY COUNCIL AGENDA REPORT
MEETING DATE: October 16, 2023
TO: City Council Members
FROM: Turu VanderWiel, Chief of Police
SUBJECT: Discussion and Community Engagement regarding the Sonora Police Department’s Annual Military Equipment Report.
RECOMMENDATION
Discussion and Community Engagement regarding the Sonora Police Department’s Annual Military Equipment Report and the Department’s Funding, Acquisition, or Use of Military Equipment
DISCUSSION
On September 30, 2021, Governor Newsom signed into law Assembly Bill 481 (AB 481) relating to law enforcement agencies' use of military equipment. AB 481, codified in California Government Code sections 7070 through 7075, requires that any law enforcement agency seeking to use existing or new military equipment to create a military use policy, present the policy for governing body approval by ordinance, and produce annual reports pertaining to the policy and use of military equipment and to hold public engagement meetings within 30 days of submitting the annual use reports.
The Sonora City Council adopted the Police Department’s Military Equipment Use Policy in April 2022; and on September 18, 2023, the Sonora Police Department submitted the attached 2022 Military Weapons report.
As required by AB 481, the Sonora Police Department will hold a public meeting to allow for community engagement. The public will have this opportunity to ask questions regarding the military equipment report and the Police Department's funding, acquisition, and use of the equipment.
FISCAL IMPACT
There is no budgetary impact for this item.
75 Item 7.
Sonora Police Department 2022 Annual Military Weapons Report 1 2022Military Equipment
Report
76 Item 7.
Sonora Police Department 2022 Annual Military Weapons Report 2 Preface 3
Summary of AB481 4
Introduction 6
Definitions 7
Summary of Military Equipment 9
Firearms 9
Equipment usage in 2022 10
Purchase of Equipment 27
Complaints 11
Policy violations 11
Conclusion 11
77 Item 7.
Sonora Police Department 2022 Annual Military Weapons Report 3 Preface:
The Sonora Police Department is committed The service we deliver to the residents, merchants, and visitors of Sonora are in keeping with the highest traditions of public safety. Safeguarding life and property is the Sonora Police Department’s highest priority and we pledge to carry out this obligation through compassion, dignity, and equality to every individual. Our actions will be distinguished by professionalism, fairness, and diligence.
The equipment listed in this annual report are essential tools that may be required from time to time to aid in deescalating intense situations or bringing volatile conditions and critical incidents to a safe resolution. The mere possession of this equipment does not warrant its use in every circumstance. With this indispensable equipment, the men and women of the Sonora Police Department continue to stand ready to accomplish our mission of driving the crime rate down and improving the quality of life in the City of Sonora. 78 Item 7.
Sonora Police Department 2022 Annual Military Weapons Report 4 Summary:
On September 30, 2021, Governor Newsom signed AB-481, requiring law enforcement agencies to obtain approval of the applicable governing body, City Council, by adoption of a military equipment use policy. The Sonora Department was required to seek City Council approval of their military equipment use policy by ordinance at a regular open meeting prior to taking certain actions relating to the funding, acquisition, or use of military equipment, as defined. The bill allows the governing body to approve the funding, acquisition, or use of military equipment within its jurisdiction only if it determines that the military equipment meets specified standards.
The approval is subject to annual City Council review to determine whether, based on an annual military equipment report, the standards set forth in the approving ordinance have been met. The City Council may renew the authorizing ordinance, disapprove authorization for particular military equipment where standards have not been met, or require modifications to the military equipment use policy to address any non-compliance with standards. Finally, the bill requires publication of the military equipment use policy and the annual military equipment report on the Department’s website.
AB-481, Section 7072 states the following: (a) A law enforcement agency that receives approval for a military equipment use policy pursuant to Section 7071 shall submit to the governing body an annual military equipment report for each type of military equipment approved by the governing body within one year of approval, and annually thereafter for as long as the military equipment is available for use. The law enforcement agency shall also make each annual military equipment report required by this section publicly available on its internet website for as long as the military equipment is available for use.
Within 30 days of submitting and publicly releasing an annual military equipment report pursuant to this section, the law enforcement agency shall hold at least one well-publicized and conveniently located community engagement meeting, at which the general public may discuss and ask questions regarding the annual military equipment report and the law enforcement agency’s funding, acquisition, or use of military equipment.
In addition to maintaining the highest levels of public safety, the Sonora Police Department is committed to transparency, public trust, community partnerships, 79 Item 7.
Sonora Police Department 2022 Annual Military Weapons Report 5 and compliance with the law. As such, the Sonora Police Department has authored the following 2022 Annual Military Equipment Report in accordance with annual reporting requirements set forth in AB-481. This report covers the usage and reporting requirements for the proceeding Calendar year (2022) 80 Item 7.
Sonora Police Department 2022 Annual Military Weapons Report 6 Introduction:
The Sonora Police Department retains a small complement of defined military equipment to assist in safely achieving its mission statement of driving the crime rate down and improving the quality of life in the City of Sonora. Our trained men and women know that the mere possession of the equipment does not warrant its use for every incident. The Sonora Police Department recognizes that critical incidents are unpredictable and can be very dynamic in nature. A variety of equipment options can greatly assist incident commanders, officers, and specific units in bringing those incidents to a swift resolution in a safe manner.
Military equipment is restricted for use only in certain instances. There may be instances wherein unpredictable critical incidents demand the need for incident commanders to authorize defined military equipment to be used in a manner not outlined within Department policy. In scrutinizing those particular instances, the judgment of the incident commander influenced by the totality of the circumstances, public safety, officer safety, civil rights, and information available at the time will be used. It is incumbent upon incident commanders, supervisors, and individual officers to recognize the particular circumstances wherein military equipment should be employed to enhance the safety of the public and officers, and to bring a critical incident to a safe resolution. This Annual Military Equipment Report outlines a summary of military equipment usage guidelines, inventory, fiscal impact, and complaints for 2022.
81 Item 7.
Sonora Police Department 2022 Annual Military Weapons Report 7 Definitions:
Pursuant to AB-481, the following definitions are applicable only to the Department’s current military equipment inventory and potential future military equipment acquisitions for operational needs. (For a more detailed list, refer to Government Code section 7070 for “military equipment” as defined within the Assembly Bill.)
“Governing body” means the City Council and Mayor.
“Military equipment” means the following:
1. Unmanned, remotely piloted, powered aerial or ground vehicles. This definition applies to the Department’s inventory of small Unmanned Aerial Vehicles (UAVs) and SWAT robots.
2. Armored personnel carriers. However, police versions of standard consumer vehicles are specifically excluded from this definition.
3. Command and control vehicles that are either built or modified to facilitate the operational control and direction of public safety units.
4. Battering rams, slugs, and breaching apparatuses that are explosive in nature. However, items designed to remove a lock, such as bolt cutters, or a handheld ram designed to be operated by one person, are specifically excluded from this definition.
5. Firearms of .50 caliber or greater. However, standard issue shotguns are specifically excluded from this definition.
6. Ammunition of .50 caliber or greater. However, standard issue shotgun ammunition is specifically excluded from this definition.
7. Specialized firearms and ammunition of less than .50 caliber, including assault weapons as defined in Sections 30510 and 30515 of the Penal Code, with the exception of standard issue service weapons and ammunition of less than .50 caliber that are issued to sworn members.
8. Any firearm or firearm accessory that is designed to launch explosive projectiles.
9. “Flashbang” devices and explosive breaching tools, “tear gas,” and “pepper balls,” excluding standard, service-issued handheld OC. This definition applies to all of the Department’s inventory of flashbangs, pepper ball launchers and related ammunition. Additionally, this definition applies to all of the Department’s inventory of various chemical agents and chemical agent delivery systems maintained by the SWAT Unit.
10.The following projectile launch platforms and their associated munitions:
40mm projectile launchers, “bean bags,” and rubber bullets. 82 Item 7.
Sonora Police Department 2022 Annual Military Weapons Report 8 11.“Military equipment” does not include general equipment not designated as prohibited or controlled by the federal Defense Logistics Agency. “Military equipment use policy” refers to the Sonora Police Department Policy 706 and means a publicly released, written document governing the use of military equipment by the Department that addresses, at a minimum, all of the following:
1. A description of each type of military equipment, the quantity sought, its capabilities, expected lifespan, and product descriptions from the manufacturer of the military equipment.
2. The purposes and authorized uses for which the Department proposes to use each type of military equipment.
3. The fiscal impact of each type of military equipment, including the initial costs of obtaining the equipment and estimated annual costs of maintaining the equipment.
4. The legal and procedural rules that govern each authorized use.
5. The training, including any course required by the Commission on Peace Officer Standards and Training, that must be completed before any sworn member is allowed to use each specific type of military equipment to ensure the full protection of the public’s welfare, safety, civil rights, and civil liberties and full adherence to the military equipment use policy.
6. The procedures by which members of the public may register complaints or concerns or submit questions about the use of each specific type of military equipment, and how the Department will ensure that each complaint, concern, or question receives a response in a timely manner. 83 Item 7.
Sonora Police Department 2022 Annual Military Weapons Report 9 Summary of Military Equipment:
The inventory of military equipment, particularly consumable material (ammunition, diversionary devices, etc.) fluctuates regularly. This is based on a variety of factors, including but not limited to operational usage, operational deterioration, training, maintenance, and expiration and replenishment guidelines. The Sonora Department is committed to transparency in disclosing its military equipment inventory and related information to our community and elected officials in compliance with the law. The Department strives to provide the most accurate military equipment inventory and information at the time of this report’s publication. The following are the various types, descriptions, and guidelines for usage of military equipment currently employed by Sonora Police Department:
Rifles: Firearms that are fired from shoulder level, having a long spirally grooved barrel intended to make bullets spin and thereby have greater accuracy over a long distance.
Description, quantity, capabilities, and purchase cost
1. Colt M16A1 RIFLE (Quantity 14)
2. Received from Law Enforcement Support Office (LESO) 1033 Program at no cost; The M16 rifle, officially designated Rifle, Caliber.223/5.56MM.
3. FEDERAL.223/5.56mm 55GR RIFLE ROUND, cost: $198 per case of 500, quantity: 32 cases. Federal 223/5.56 MM Remington ammo features a lead core 55 Grain Full Metal Jacket bullet that is nonmagnetic, non¬corrosive boxer primer and brass casing. The Federal ammo has a muzzle velocity of 3240 feet per second and muzzle energy of 1282 ft-lbs.
Purpose
To be used as precision weapons to address a threat with more accuracy and/or from greater distances as a handgun, if present and feasible.
Equipment Usage 2022:
84 Item 7.
Sonora Police Department 2022 Annual Military Weapons Report 10 This section outlines the military equipment usage for 2022. Training usage is not captured in this section. This section only provides data for the operational use of military equipment listed within this Annual Equipment Report.
The following are incidents where designated equipment was deployed:
1. Various deployments of the Colt M16A1 rifle in response to potential or perceived threats. These incidents include:
a. Search Warrants
b. Area search of dangerous subjects
c. Response to shots fired and parameter search of School d. Coverage for holt-up / robbery alarms
Purchase of Equipment in 2022:
Pursuant to Sonora Police Policy 706, the following equipment defined as Military Equipment by law was purchased in 2022:
There were no purchases made for defined Military Equipment by SPD in 2022.
Complaints regarding use of Military Equipment:
85 Item 7.
Sonora Police Department 2022 Annual Military Weapons Report 11 In some instances, the application and use of military equipment may cause questions and/or concerns for members of the community. It is vitally important that community members’ questions regarding the application and use of military equipment are addressed. The Sonora Police Department is committed to full and fair investigation of citizen complaints. As such, the Department has sound internal policies for thorough and impartial investigations of citizen complaints.
Resolving complaints in a fair, impartial, and expeditious manner will ensure the consistent high level of integrity and efficiency maintained by the Department.
The following is a summary of formal investigations related to the use of military equipment as investigated by the Sonora Police Department’s Internal Affairs Unit for 2022:
There were no complaints/investigations regarding the use of Military Equipment in 2022
Summary and responses to Policy 706 violations:
No violations of Policy 706- Military Equipment use, were reported or known of in 2022.
Conclusion:
This Annual Military Equipment Report reaffirms the Sonora Police Department’s commitment to providing transparency and information to our community and elected officials in addition to ensuring compliance with the law. The equipment, resources, and training outlined in this report allow Sonora Police Officers to better protect our community, enhance the safety of the public and officers, and bring critical incidents to a safe resolution. Public safety is and always has remained a shared responsibility. The strength of our Department lies in a partnership with our community to address crime in their neighborhoods. 86 Item 7.
{CW133469.2}
CITY COUNCIL AGENDA REPORT
MEETING DATE: October 16, 2023
TO: City Council Members
FROM: Melissa Eads, City Administrator
Douglas L. White, City Attorney
SUBJECT: Provide Direction to Staff regarding the Use of Remote Meeting Attendance Platforms such as Zoom at City Council Meetings.
RECOMMENDATION:
Provide direction to staff regarding the use of Zoom or other similar remote meeting attendance platforms during City Council meetings. To ensure that City Council meetings are not unduly interrupted, City staff recommends that the use of Zoom or other remote meeting attendance platforms be limited to City staff and consultants attending a City Council meeting remotely, and not be allowed for public comment via Zoom unless a City Council member is participating in the meeting via Zoom.
BACKGROUND:
Recently, there has been an increase in instances of members of the public anonymously interrupting city council meetings through virtual attendance platforms such as Zoom. Currently, the City of Sonora (“City”) allows public participation in City Council meetings via Zoom at all City Council meetings, whether a City Council member is attending the City Council meeting remotely or not.
DISCUSSION / ANALYSIS:
The Brown Act is California’s statutory “open meetings” requirement, focused on providing transparency at the local government level. The Brown Act requires, among other obligations, that “legislative bodies,” a category that encompasses city councils, include in “[e]very agenda for regular meetings…an opportunity for members of the public to directly address the legislative body on any item of interest to the public, before or during the legislative body’s consideration of the item, that is within the subject matter jurisdiction of the legislative body,” as well as an opportunity to comment during special meetings.1 The Brown Act also requires that all regular and special meetings be held in the physical presence of the public, with limited exceptions.2 During the height of the COVID-19 pandemic, AB 361 allowed for meetings to be held entirely virtually.
3 Under the provisions of AB 361, virtual meetings were required to permit live public comment via the internet.4 AB 361 became inactive in February of 2023 when the State of Emergency associated with the COVID-19 pandemic expired. Since the expiration of AB 361, City Council members have only been allowed to participate in meetings virtually under certain
1 Gov. Code, § 54954.3.
2 Gov. Code, § 54953.
3 Gov. Code, § 54953(e)(1).
4 Ibid.
87 Item 8.
{CW133469.2}
circumstances.5 Under the revised Brown Act requirements upon the expiration of AB 361, when a member of the City Council teleconferences into a meeting, the opportunity for public comment must also be available virtually.6
At a meeting that all City Council members participate in person, there is no requirement that members of the public be allowed to comment virtually. The Brown Act requires merely that the public be permitted to directly address the City Council, and notes that the “legislative body…may adopt reasonable regulations” for streamlining public comment.7
Currently, the City permits public comment in a variety of ways including live comment via Zoom. Because public comment provided via Zoom was not an option for public comment at City Council meetings prior to the COVID-19 pandemic, it would be reasonable regulation to prohibit the public from commenting via Zoom, while allowing participation by City staff and consultants to participate remotely. Limiting public comment via Zoom helps to ensure that City Council meetings are not disrupted in a manner that prevents the City from conducting its business. Remote participation by City staff and consultants allows the City to have staff participation at City Council meetings where staff may be unable to remain at City offices on evenings when City Council meetings occur and saves the City money where consultants would otherwise travel to City Council meetings and charge the City for travel. The requirements for virtual public comment are only triggered if a City Council member participates remotely, and do not apply to City staff or consultants.
The City Council may also consider directing that during times that Zoom or some other remote meeting attendance platform is used, the public would be able to view the meeting via Zoom but would be unable to provide comments. This would allow the public to attend and observe City Council meetings in a remote environment but would address concerns about disruption of City Council meetings via Zoom.
FISCAL IMPACT:
None.
ENVIRONMENTAL:
None.
OPTIONS:
1. Provide direction to staff regarding the use of Zoom or other remote meeting attendance platforms for future City Council meetings.
2. Decline to limit remote participation and continue utilizing Zoom or other remote meeting attendance platforms that has been the City’s practice since the COVID-19 pandemic began.
5 Gov. Code, §§ 54953(b), (e).
6 Gov. Code, §§ 54953(e), (f).
7 Gov. Code, § 54954.3.
88 Item 8.
CITY COUNCIL AGENDA REPORT
MEETING DATE: October 16, 2023
TO: City Council Members
FROM: Rachelle Kellogg, Community Development Director
SUBJECT: Woods Creek Park Basketball Court – Bid Authorization
RECOMMENDATION
Consideration of authorization to advertise for public bid the Woods Creek Park Basketball Court Project.
DISCUSSION
As shown on the plans the project includes constructing a ½ basketball court in the lawn area adjacent to the public restrooms in Woods Creek Park. The project was included in the City’s approved grant application under the 2018 Parks Bond Act Per Capita Program. The City Engineer’s Estimate for the project is $84,300. The amount of grant funds available is $168,000. The balance of the grant funds will be used, as included in the approved grant application, to resurface the playground area, replace damaged playground equipment and reconstruct a shade structure.
FISCAL IMPACT
The costs for this project is included in the Fiscal Year 2023-2024 Budget City Council approved budget. No City General Funds are allocated to this project.
ATTACHMENTS
1) Final Approved Project Plan
2) Engineers Estimate
89 Item 9.
GENERAL NOTES/SPECIFICATIONS
1. Concrete Basketball court to be 52' X 32' X 5" thick concrete reinforced with #4 rebar at 12" both ways and placed over 6" of 3/4" Class 2 Caltrans Aggregate Base compacted to 95% Relative Compaction.
A. Concrete work and materials shall be in accordance with Caltrans Standard Specifications 2018 Sections 51, 73, and 90.. Concrete shall be of a design mix with a 28 day strength of 3500 psi based upon a proven cylinder brake history, and shall be provided with admixtures to improve workability, reduce shrinkage, and with a high sand to aggregate ratio to support the special finish. as indicated below.
B. Special finish for the horizontal surfaces of the court area shall be an evenly gray colored light sand wash finish produced by washing and brushing the finished surface after using a cure retarder such as Top-Cast or Lithocast. Sand wash process shall be as recommended by the retarder manufacturers specifications for a light sandblast finish of even gray color. After the sand wash finish process, the slab shall be cured in accordance with the manufacturers recommendations. The special finish shall be pre-tested with at least two 24" x 24" samples approved by the Engineer prior to application on the project.
C. Reinforcement to shall be ASTM, A615 Grade 60. In the 5" slab, all rebar shall be supported by to be 2" clear of the base or subgrade surface.
D. After finishing of the court concrete surface, crack control joints of 1/4" wide x 1" deep shall be concrete sawcut into the court surface on a 10' to 12' pattern as indicated in the Basketball Court Detail.
After concrete cure, these crack control joints shall be filled to a flush surface with a flexible epoxy joint sealer gray in color.
2. The Basketball Hoop Assembly shall be a pro style heavy duty hoop assembly as commercially provided by Mega-Slam, Pro-Dunk or other commercial manufacturers, and with the following characteristics.
A. Backboard to be a rust resistant 72" x 42" backboard with heavy duty rustproof perforated aluminum or steel backboard, with an inground heavy duty rust resistant column with a 5' backboard offset at 10' hoop height, and adjustable in height to 6'. Manufacturer to include a heavy duty base plate and 6 anchor bolts with an adjustable column angle. Assembly to include a pro hoop, padded column and backboard pads and assembly instructions. A submittal of the product brochure shall be submitted and approved the Engineer prior to ordering.
B. The Hoop Assembly Footing shall consist of a minimum 36" X 36" concrete column footing which will extent to 4'-6" below the finish grade of the court. The footing will be capped with a 4' x4' x 6" concrete slab which would be poured with and tied into the court slab. The slab and footing would be reinforced with #4 @ 12" rebar both ways and for both horizontal vertical directions in the footing, as well a the hoop assembly manufacturers recommendations for extension of the anchors bolts for the assembly. The footing for the assembly shall be excavated and poured prior to the court slab and after inspection by the Engineer. The may be some adjustments made for soil and rock conditions.
3. Grading/Landscaping. The site and existing lawn area to be graded and removed shall be a minimum of 7' outside of the court periphery show in the detail plan. Grades shown on the plan are approximate and may be adjusted by the Engineer. It is intended the edge of the court be 2" above existing grade and the finish grade of the replaced lawn area slope slightly to the swale lines to drain away from the court slab. The site should be excavated to 6" below the court slab for installation of the court.
After poring of the court, the edge of the court to the swale line should be backfilled with aggregate to about 3" below the court so that some soil and grass sod can be installed to the top of the court slab and drain to the swale line. Provide submittals for the replacement grass sod for approval of the Engineer prior to ordering.
4. New Underdrain. Install new underdrain and drainage inlets in accordance to details shown on the plan. Sawcut existing concrete slab to tie into existing drain and patch concrete to match existing concrete walkway.
5. Irrigation Lines. Locate all irrigation lines in the vicinity of the court . Relocate existing 1.5" line around court slab with 1.5" Schedule 40 PVC. Shut off irrigation onto work area during construction. Adjust irrigation to not spray on court after construction.
6. Court Striping to be 2" wide acrylic paint (white) over an acrylic primer to a high school template for a half court. Include edge and limit lines.
7. Provide 4' chain link fence height addition to 10 feet for +/-50 feet as indicated on the plan. Provide 5 each 10' long 2" pipe supports U bolted with 3 U-bolts each to existing vertical pipe supports. Provide 1 12 " pipe horizontal fence supports at 6' and 9' to support new 4' fence panel. Provide all necessary chain link fence accessories required to support the fence addition. 90 Item 9.
ITEM ITEM ESTIMATED UNIT UNIT
NO DESCRIPTION QUANTITY PRICE EXTENSION
====== ===================================== =========== ===== =========== ================ 1 GENERAL REQUIREMENTS/MOBILIZATION 1 LS $ 5,000.00 $ 5,000.00 2 EXCAVATION/DISPOSAL 80 CY $ 50.00 $ 4,000.00
64'X45'X0.75'
3 6" CLASS 2 AGGREGATE BASE IN PLACE 86 TON $ 75.00 $ 6,450.00 40' X 60' X .0.5' @144#/CF
4 5" CONCRETE COURT SLAB -REINFORCED 1680 SF $ 16.00 $ 26,880.00 32' X 52' +4X4
5 BASKETBALL HOOP ASSEMBLY DELIVERED 1 LS $ 5,000.00 $ 5,000.00 6 HOOP ASSEMBLY FOUNDATION/ SETUP 1 LS $ 5,000.00 $ 5,000.00 7 COURT STRIPING 1 LS $ 2,000.00 $ 2,000.00
8 RELOCATE IIRRIGATION LINES 1 LS $ 1,000.00 $ 1,000.00 9 6" UNDERDRAIN W/BACKFILL/CONC 143 LF $ 20.00 $ 2,860.00 10 UNDERDRAIN DRAINAGE INLET 2 EA $ 1,200.00 $ 2,400.00 11 BACKFILL/LANDSCAPING/SOD 1450 SF $ 3.00 $ 4,350.00
7' - 8' AROUND COURT
12 CHAIN LINK FENCE 4' ADDITION 50 LF $ 50.00 $ 2,500.00 =================
LUMP SUM TOTAL EXTENSION 1 LS $ 67,440.00
CONTINGENCY IN BIDDING (25%) $ 16,860.00
=================
TOTAL ESTIMATE $ 84,300.00
FOR BIDDING, QUANTITIES SHOWN ABOVE SHALL BE CONSIDERED FINAL PAY QUANTITIES
ENGINEERS ESTIMATE
10/06/2023
91 Item 9.
CITY COUNCIL AGENDA REPORT
MEETING DATE: October 16, 2023
TO: City Council Members
FROM: Chris Gorsky, Administrative Services Director
SUBJECT: Administrative Services Department Report for August 2023
RECOMMENDATION
Receive the Administrative Services Department Report for August 2023 (FY23/24).
DISCUSSION
Monthly Report to the City Council
August 2023
Highlights of General Fund Revenues:
Current Period YTD FY22/23 Budget % of Budget
Property Tax $ 18,971 $ 23,540 $ 1,205,000 2.0%
Sales Tax $ 299,017 $ 606,195 $ 3,355,600 18.1%
Measure Y $ 275,792 $ 870,705 $ 3,800,000 22.9%
Transient Occupancy Tax $ 41,863 $ 93,794 $ 600,000 15.6% Cannibis Public Benefit Fees $ 64,416 $ 64,416 $ 605,000 10.6% Building Permits $ 11,385 $ 20,472 $ 130,000 15.7%
Business Licenses $ 1,218 $ 2,961 $ 126,900 2.3%
Highlights of General Fund Expenditures:
Current Period YTD FY22/23 Budget % of Budget
Salaries and Benefits $ 484,052 $ 1,082,830 $ 7,380,850 14.7% Operating Expenditures $ 178,532 $ 470,215 $ 3,057,600 15.4% Transfers $ - $ - $ 185,000 0.0%
A/P YTD H/R YTD
Total Number of Checks/DD Processed: 233 494 91 273
Business License Activity:
Current Month
Zone A
Current Month
Zone B
YTD
Zone A
YTD
Zone B
Licenses Issued 0 15 1 31
The Administrative Services Department provides a wide range of comprehensive support services which include: accounting, finance administration and reporting, budgeting, audit, compliance, treasury management, payroll, human resources, recruitments, accounts receivable, local tax collection, accounts payable, procurements, business license management, risk management, information technology for the City.
92 Item 10.
CITY COUNCIL AGENDA REPORT
MEETING DATE: October 16, 2023
TO: City Council Members
FROM: Aimee New, Fire Chief
SUBJECT: Fire Department Monthly Report – September 2023
RECOMMENDATION
Fire Department Monthly Report – September 2023
DISCUSSION
Fire Department Monthly Report – September 2023
FISCAL IMPACT
N/A
1. City of Sonora Fire Department responded to 173 calls for service in September 2023.
2. Sonora City Units responded to emergency calls as follows:
131 - Passenger vehicle fire 1
142 - Brush or brush-and-grass mixture fire 1
311 - Medical assist, assist EMS crew 28
321 - EMS call, excluding vehicle accident with injury 79 322 - Motor vehicle accident with injuries 1
324 - Motor vehicle accident with no injuries. 3
412 - Gas leak (natural gas or LPG) 2
462 - Aircraft standby 1
500 - Service Call, other 1
510 - Person in distress, other 6
531 - Smoke or odor removal 1
551 - Assist police or other governmental agency 1
553 - Public service 6
554 - Assist invalid 2
611 - Dispatched & cancelled en route 24
622 - No incident found on arrival at dispatch address 2 651 - Smoke scare, odor of smoke 5
700 - False alarm or false call, other 1
730 - System malfunction, other 2
733 - Smoke detector activation due to malfunction 1
735 - Alarm system sounded due to malfunction 3
736 - CO detector activation due to malfunction 1
93 Item 11.
740 - Unintentional transmission of alarm, other 1
Total: 173
3. Monthly dollar loss in the City, resulting from fire: 0
4. The average response time during the month: 4:35
5. Automatic or mutual aid given: 55
94 Item 11.
CITY COUNCIL AGENDA REPORT
MEETING DATE: October 16, 2023
TO: City Council Members
FROM: Turu VanderWiel, Chief of Police
SUBJECT: MONTHLY REPORT – SONORA POLICE DEPARTMENT
RECOMMENDATION
Receive the Sonora Police Department monthly report for September 2023.
DISCUSSION
The attached summarizes activities for September 2023.
Sept 2023 Aug 2023 Sept 2022
Total Incidents 1,269 1,160 1,215
Calls for Service 832 753 802
Officer Initiated 437 407 413
Total Arrests 47 35 55
Felony Arrests 7 12 12
Misd. Arrests 40 23 43
Total Reports 129 117 122
Parking Citations 26 8 7
Moving Citations 8 24 10
Domestic Violence 4 5 6
Larceny Invest. 8 6 15
Total Collisions 28 27 33
Collision Invest. 17 13 13
95 Item 12.
August 2023 Aug 2023 Sep 2022
Homeless Activity 118/26 128/20 118
Animal Calls 40 46 28
Public Intox. / UID 9 6 2
DUI Arrests 8 2 -----------------
Total Phone Calls /
911 Calls
2,374/347 ------------------ 2,352
Average Per Day 79 ------------------ 78
Vehicle Releases 10 5 4
*Homeless Activity tracking requires additional manual inputs; the actual number of associated incidents will typically be higher than the reported number. *The Larceny Investigation category reflects only those incidents where an investigation is conducted and a case report is generated. The actual number of larcenies is considerably higher.
FISCAL IMPACT
There is no fiscal impact on the General Fund
96 Item 12.
Crimes by Area Monthly Report
September 1, 2023 – September 30, 2023
Area 1 Reports:
Violent Crimes:
2 – Misdemeanor Domestic Battery
1 – Misdemeanor Oral Copulation including intimate touching against will 1 – Misdemeanor Assault with a Weapon, other than a firearm 1 – Misdemeanor Brandishing of a Weapon, other than a firearm Burglaries / Other Larceny:
1 – Felony Vehicle Theft including a misdemeanor vehicle tampering and subsequent recovery of the stolen vehicle
1 – Felony Business Burglary, including vandalism
3 – Misdemeanor Business Burglaries (Shoplifting)
2 – Misdemeanor Petty Theft from a Business Location
Area 2 Reports
Violent Crimes:
2 – Felony Domestic Violence
(one including a misdemeanor violation of a domestic violence order) (one including a misdemeanor battery)
1 – Felony Child Endangerment
1 – Felony Assault on a Person likely to cause Great Bodily Injury 1 – Misdemeanor Battery on a Police Officer
1 – Misdemeanor Assault on a Person
Burglaries / Other Larceny:
1 – Misdemeanor Business Burglary (Shoplifting)
97 Item 12.
Area 1 Monthly Report
September 2023
Neighborhood Watch:
ELKS HILL:
No updated activity.
SONORA KNOWLES:
No updated activity.
Cases For discussion:
23-966- On 9/1/23, Officers were dispatched to a possible DUI vehicle collision on N. Stewart Street and Elkin Street. A Sergeant identified and contacted the driver who was later determined to be DUI. The driver, 32 year old Dawn Taylor out of Columbia, resisted arrest, spit and kicked at an Officer and Sergeant. Taylor was arrested for DUI, resisting arrest, and battery on Peace Officers.
23-1078- On 9/26/23, A Corporal identified two transients who appeared to be under the influence of a controlled substance in a city park. The transients were identified as 43 year old Matthew Harrison and 30 year old Zachary Lopez-Dominguez, both from Sonora. The Corporal located fentanyl, drug paraphernalia, an illegal firework, and open container of an alcoholic beverage. Harrison and Lopez-Dominguez were arrested for being under the influence of a controlled substance, possession of drugs and drug paraphernalia, and Harrison additionally for the open container and firework.
Recruitments:
4 Full-time Police Officers
1 Full-time Dispatcher
1 Part-time Dispatcher
1 Full-time Community Service Officer
Training:
One Sergeant attended Internal Affairs Investigation training One Dispatcher attended a three week Basic Dispatcher Academy One Corporal attended a two week ICI Core investigations course One Corporal attended Narco Safety and Emerging Drug Trends training One Recruit started a POST Basic Intensive Police Academy Range:
No Range training was scheduled for the month of September.
Respectfully Submitted,
Sgt. Chris Johnson
98 Item 12.
Area 2 Monthly Report
September 2023
Neighborhood Watch:
MYERS HILL:
No updated activity
NORTH STEWART:
No updated activity.
HIGHLAND VIEW:
No updated activity
Case(s) for discussion:
23-1063-On 09-23-2023, at approximately 10:21 p.m., Sonora PD officers were dispatched to Twilight Court for a report of a verbal altercation between a male and female. Once Officers arrived on scene, the male suspect fled the residence on foot and was alleged to be in possession of a handgun. A perimeter was formed around the home and the suspect was contacted via the telephone. After speaking with the suspect for several minutes, he turned himself in. The suspect was booked for felony domestic violence, felon in possession of a firearm, violation of a restraining order, and a probation violation. 23-1017-On 09/15/2023, at approximately 2:00 a.m., Sonora PD officers were dispatched to the downtown area concerning an assault with a deadly weapon. A male suspect struck another male on the head with a silver, collapsible baton. The victim suffered a small laceration on his forehead, which required 4 stitches to close. The suspect fled the scene and has not yet been identified.
Field Training Program:
One reserve Officer has completed the Field Training Program Investigations:
Corporal Brickley completed the Robert Presley Institute of Criminal Investigation (ICI) course, which provides detectives with advanced training and skills for investigating serious crimes.
Property and Evidence:
No updated activity
Fleet:
No updated activity
Reserves/Volunteers:
One new CSV application has been received and will be moved into the background process.
Respectfully Submitted,
Sgt. Eric Nygard
99 Item 12.
CITY COUNCIL AGENDA REPORT
MEETING DATE: October 16, 2023
TO: City Council Members
FROM: Melissa Eads, City Administrator
SUBJECT: Sonora Public Works Department Monthly Report for September 2023
RECOMMENDATION
Receive the Sonora Public Works Department monthly report for September 2023.
DISCUSSION
For the month of September 2023, the City of Sonora Public Works Department performed the following activities:
Events
Placed banners above Washington Street for upcoming events. Staged barricades and signage for road closures prior to the Homecoming Parade. Assisted Sonora Police Department with road closures during the Parade.
Streets
Continued, and completed painting of street markings throughout the City. Pruned several trees on Barretta Street.
Spent numerous days hot patching several areas throughout the City. Spent several days potholing City Streets.
Loaded, and hauled three pay piles throughout the City. Returned numerous shopping carts to businesses abandoned on City Streets. Continued pressure-washing sidewalks, and trashcans around downtown. Pressure-washed block wall on Green Street and Barretta Street. Repaired a section of railing on Mono Way near General Supply. Removed asphalt in gutter pan preventing proper drainage on Stewart Street. Made repairs to the sidewalk on Green Street.
Removed a portion of the damaged railing on Mono Way near McDonalds. Installed a new railing on Greenley Road near the car wash to prevent vehicles from driving off the edge.
Facilities
Installed a new boot scraper at the Police Department.
Parks/Landscapes/Parking Lots
Removed graffiti at Rotary Park.
Removed graffiti in the Terzich Parking Structure.
Monthly inspection of playground equipment at Rotary Park. Pruned the trees in the Fire Museum landscape.
100
Item 13.
Storm Drains
Spent numerous days digging out hundreds of storm drain inlets, and outlets.
Cemeteries
Performed annual weed spraying at Mountain Shadow.
Daily – Check of messages at Mountain Shadow, and return calls as needed. Daily – Cleaning of irrigation filters during irrigation season. Marked out plots as requested by Funeral Home as needed. Set headstones as requested by Funeral Home.
Mowed and edged lawns weekly during spring and summer months. Made repairs to the irrigation system.
Miscellaneous
Daily – Unlock, and service all public restrooms.
Garbage collection twice a week in all City parking lots, landscapes, and parks. Monthly fleet vehicle inspections.
Twice weekly – Run the street sweeper on a rotating street schedule throughout the City. Put out Farmers Market no parking signs weekly.
FISCAL IMPACT
No fiscal impact to the General Fund.
101
Item 13.