WATER QUALITY CONTROL PLANT
PROJECT ACCEPTANCE
WQCP AND
PUMP
STATION
COATING AND
CORROSION
PROTECTION
PROJECT
PHASE-1
(PROJECT
N
O. SS1307)
MAY 11, 2022
Attachment 1
- Main WQCP
- Sewage Pump Station No. 9 (PS9)- Sewage Pump Station No. 11 (PS11)- Lindenville Stormwater Pump Station (LPS)
PROJECT OVERVIEW
• Provide Temporary solids handling facilities • Abrasive blast and recoat Sludge Dewatering Building • Surface preparation and recoating of Cake Hopper Structure • Recoating exterior surfaces for Pump Station No. 9 and 11• Recoat piping, metal surfaces and electrical panel at Lindenville Stormwater Station • All coating applications were inspected by a third party coatings inspection company (Bay Area Coatings) BEFORE
PROGRESS PHOTOS
PROGRESS PHOTOS
AFTER
AFTER
CONSTRUCTION COST
The total construction cost incurred to date for the project is summarized as follows:
Projected Actual
Redwood Painting Co Inc $691,195.79 $691,195.79Construction Contingency (20%) $138,239.21 $24,799.80Total Project Budget $829,435.00 $715,995.59