Site Key Plan
Date
GOP 4 PRECISE PLAN 4S
PS4 4N

GATEWAY BLVD

OYSTER POINT BLVD
GOP 1
GOP 2
GOP 3
OP 180 OP 200
B5W
B5E
PS 5
PS 2
PS 3

AMENITY

RAILROAD SPURS
650 California St 17th Floor
San Francisco, CA 94108
Description of Package

PRECISE PLAN
APN #015-023-200
APN #015-023-320
06/08/2020

GATEWAY OF PACIFIC
09/17/2021
GOP 4 DENSITY TRANSFER PROJECT

MODIFICATION TO PRECISE PLAN

PRECISE PLAN - MODIFICATIONS

APPLICATION REQUIREMENTS CHECKLIST

SHEET NUMBER(S)
C4-201
A4-100
N/A
A4-301 & A4-302
N/A
A4-200 TO A-206
N/A
L4-100 TO L4-102
C4-401 TO C4-402
C4-601 TO C4-602
W4-100 TO W4-104
A4-300 TO A4-302
G4-002
C4-101
L4-404

SITE PLAN EXISTING

EXISTING

EXISTING

EXISTING

ELEVATION DRAWINGS

FLOOR PLANS

LANDSCAPE PLAN

PROPOSED

PROPOSED

PROPOSED

PROPOSED

GRADING & DRAINAGE PLAN

SIGNAGE & LIGHTING PROGRAM

EXISTING PHOTOS
(SITE & SURROUNDING PROPERTIES)

ANY APPLICABLE TENTATIVE,

FINAL OR PARCEL MAPS

COLOR RENDERINGS OF ALL

ELEVATIONS

PROJECT INFORMATION
GOP 4 (B4)
900 GATEWAY BLVD.

SOUTH SAN FRANCISCO,CA
94080
APN 015-023-200 (PARCEL D)
APN 015-023-320 (PARCEL D)

GSPD - GATEWAY SPECIFIC PLAN DISTRICT
approx. 6.35 ACRES

HOTEL, MULTI-STORY OFFICE, R&D FLEX, LIGHT

MANUFACTURING, WAREHOUSE
PROJECT ADDRESS:

ASSESSOR PARCEL NUMBER:

ZONING DESIGNATION
LOT SIZE:

ADJACENT USES:

PARKING STRUCTURE 4 (PS4)
TBD

PROJECT DESCRIPTION
GOP4 DENSITY TRANSFER PROJECT

MODIFICATION TO PRECISE PLAN
THIS PROJECT SEEKS TO MODIFY THE GOP 4 PRECISE PLAN TO TAKE ADVANTAGE OF THE ADDITIONAL SQUARE FOOTAGE THAT COULD BE BUILT UNDER THE 1.0 FAR APPLICABLE TO THE ADJACENT RAIL SPURS BY TRANSFERRING THAT DENSITY TO GOP 4. THE FAR AT GOP 4 WOULD BE INCREASED FROM .82 TO 1.25.

THE DENSITY TRANSFER PROJECT WILL ADD FOUR FLOORS TO THE GOP 4 NORTH BUILDING, AND 2.5 FLOORS TO THE GOP 4 PARKING GARAGE. CHANGES FROM APPROVED PLANS ARE NOTED IN THIS PLAN SET. NO APPROVALS OR MODIFICATIONS ARE SOUGHT WITH RESPECT TO UNMARKED DATA.

Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345 678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan Modifications
N
GOP 4 DENSITY TRANSFER

PROJECT MODIFICATION

TO PRECISE PLAN
20189-07 FLAD
02/28/2020 FLAD

PROJECT DATA
G4-001

GATEWAY OF

PACIFIC

SHEET INDEX - PRECISE PLAN
A4-400 SITE CROSS SECTIONS
A4-321 PARKING STRUCTURE 4 EXTERIOR WALL SECTIONS
A4-320 PARKING STRUCTURE 4 EXTERIOR ELEVATIONS
A4-308 LOADING/SERVICE
A4-307 B4 EXTERIOR WALL SECTION
A4-306 B4 EXTERIOR WALL SECTION
A4-305 B4 EXTERIOR WALL SECTION
A4-303 B4 EXTERIOR WALL SECTION
A4-303 B4 SOUTH - EXTERIOR ELEVATIONS
A4-302 B4 NORTH - EXTERIOR ELEVATIONS
A4-301 B4 NORTH - EXTERIOR ELEVATIONS
A4-300E GOP 4 RENDERING
A4-300D GOP 4 RENDERING
A4-300C GOP 4 RENDERING
A4-300B GOP 4 RENDERING
A4-300A GOP 4&5 SITE RENDERING
A4-300 OVERALL ELEVATIONS
A4-228 PS4 - EIGHT (ROOF) LEVEL FLOOR PLAN
A4-227 PS4 - SEVENTH LEVEL FLOOR PLAN
A4-226 PS4 - SIXTH LEVEL FLOOR PLAN
A4-225 PS4 - FIFTH LEVEL FLOOR PLAN
A4-224 PS4 - FOURTH LEVEL FLOOR PLAN
A4-223 PS4 - THIRD LEVEL FLOOR PLAN
A4-222 PS4 - SECOND LEVEL FLOOR PLAN
A4-221 PS4 - GROUND LEVEL FLOOR PLAN
A4-210 B4 - ROOF LEVEL NORTH BUILDING
A4-209 B4 - PENTHOUSE LEVEL NORTH BUILDING
A4-208 B4 - LEVEL 09 FLOOR PLAN NORTH BUILDING
A4-207 B4 - LEVEL 08 FLOOR PLAN NORTH BUILDING
A4-206 B4 - LEVEL 07 FLOOR PLAN NORTH BLDG -ROOF PLAN LEVEL SOUTH BLDG A4-205 B4 - LEVEL 06 FLOOR PLAN NORTH BLDG -PENTHOUSE LEVEL SOUTH BLDG A4-204 B4 - LEVEL 05 FLOOR PLANS NORTH AND SOUTH BUILDINGS A4-203 B4 - LEVEL 04 FLOOR PLANS NORTH AND SOUTH BUILDINGS A4-202 B4 - LEVEL 03 FLOOR PLANS NORTH AND SOUTH BUILDINGS A4-201 B4 - LEVEL 02 FLOOR PLANS NORTH AND SOUTH BUILDINGS A4-200 B4 - LEVEL 01 FLOOR PLANS NORTH AND SOUTH BUILDINGS A4-100 SITE PLAN
C4-602 PRELIMINARY STORMWATER CONTROL PLAN
C4-601 PRELIMINARY STORMWATER CONTROL PLAN
C4-502 PRELIMINARY UTILITY PLAN
C4-501 PRELIMINARY UTILITY PLAN
C4-402 CONCEPTUAL GRADING PLAN
C4-401 CONCEPTUAL GRADING PLAN
C4-302 PROPOSED SITE PLAN
C4-301 PROPOSED SITE PLAN
C4-202 EXISTING CONDITIONS
C4-201 EXISTING CONDITIONS
C4-101 BOUNDARY PLAN
L4-502 SITE SECTION ENLARGEMENT
L4-501 SITE SECTIONS
L4-404 SITE FURNISHING PALETTE
L4-402 SITE FURNISHING PALETTE
L4-401 SITE FURNISHINGS
L4-303 PLANTING PALETTE
L4-302 PLANTING ZONES
L4-301 PLANTING ZONES
L4-203 PAVING PALETTE
L4-202 PAVING PLAN
L4-201 PAVING PLAN
L4-104 VIEW OF CENTRAL SQUARE
L4-103 VIEW OF DINING DECK & GARDEN
L4-102 PROPOSED SITE PLAN
L4-101 PROPOSED SITE PLAN
L4-100 SITE CONTEXT PLAN
W4-110 PHASE 4 SIGN ELEVATION (PRELIMINARY)
W4-109 PHASE 4 SIGN ELEVATION (PRELIMINARY)
W4-108 PHASE 4 SIGN ELEVATION (PRELIMINARY)
W4-107 PHASE 4 SIGN ELEVATION (PRELIMINARY)
W4-106 PHASE 4 SIGN ELEVATION (PRELIMINARY)
W4-105 PHASE 4 SIGN ELEVATION (PRELIMINARY)
W4-104 PHASE 4 SIGN ELEVATION (PRELIMINARY)
W4-103 PHASE 4 SIGN ELEVATION (PRELIMINARY)
W4-102 PHASE 4 SIGN VISIBILITY (PRELIMINARY)
W4-101 PHASE 4 SQUARE FOOTAGE (PRELIMINARY)
W4-100 PHASE 4 SIGN LOCATION PLAN (PRELIMINARY)
G4-004 PROPOSED PRECISE PLAN EXTENTS
G4-003 GOP 1,2,3,4 & 5 INTEGRATED CAMPUS
G4-002 EXISTING SITE PHOTOS
G4-001 PROJECT DATA
G4-000 COVER SHEET
Rev Date Description
153862240.1
GOP 4 DENSITY TRANSFER PROJECT
GOP 1
Parcel C
GOP 2
Parcel B
GOP 3
Parcel A
GOP 4
Parcel D
GOP Master
Plan (1-4)
Lot Square
Footage,
after most
recent LLA
284,584
(6.53 acres)
237,986
(5.46 acres)
185,262
(4.25 acres)
276,639a
(6.35 acres) 984,471
As Built or Entitled – Before GOP 4 Density Transfer Project Building
Floor Area 479,116 371,648 302,722 225,621b 1,379,107
Building
Floor Area
that counts
towards FAR
427,104 312,130 265,734 225,621 1,230,589
FAR 1.50 1.31 1.43 0.82 1.25
After Implementation of the GOP 4 Density Transfer Project, Which Proposes to Transfer 120,221 SF from the Rail Spurs to GOP 4 Building
Floor Area 479,116 371,648 302,722 345,842 1,499,328
Building
Floor Area
that counts
towards FAR
427,104 312,130 265,734 345,842 1,350,810
FAR 1.50 1.31 1.43 1.25 1.37
Notes
Floor Area is calculated pursuant to Municipal Code § 20.040.008. Floor Area Ratio (FAR) is calculated pursuant to Municipal Code § 20.040.009.
a. The GOP 4 parcel was 276,422 SF when BMR first applied for the GOP 4 Precise Plan.

Pursuant to a Lot Line Adjustment subsequently approved by the City, the GOP 4 parcel is now 276,639 SF.
b. The approved plan set for GOP 4 shows 226,000 SF of Floor Area. However, subsequent calculations that took into account the exact square footage of GOP 1 – 3 revealed that only 225,261 SF of Floor Area (a difference of 379 square feet) is available to be built at GOP 4 under the 1.25 FAR currently applicable to the entire GOP Master Plan site.

GOP 4 DENSITY

TRANSFER PROJECT

MODIFICATION TO

PRECISE PLAN
09/17/2021
Precise Plan Modifications
20198-07

DRAFT DRAFT
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345 678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan
Phase 4
South San Francisco, CA 94080
N
GOP 4 PRECISE PLAN
20189-01 FLAD
02/28/2020 FLAD
GOP 1,2,3,4 & 5

INTEGRATED CAMPUS
G4-003

GATEWAY OF

PACIFIC
Rev Date Description
GOP 5E
APN 015-071-330
PS 4
APN 015-023-200
RAIL SPUR-1
APN 015-071-220
RAIL SPUR-2
APN 015-071-999
GOP 4N
APN 015-023-200
GOP 4S
APN 015-023-200
GOP 5W
APN 015-071-330
PS 5
APN 015-071-330

AMENITY
APN 015-023-470
GOP 1
APN 015-023-470
GOP 2
APN 015-023-450
PS 2
APN 015-023-450
GOP 3
APN 015-023-290
PS 3
APN 015-023-290

OYSTER POINT BLVD

GATEWAY BLVD

ECCLES AVENUE

VETERANS BLVD
N
0’ 55’ 110’ 220’
1”=110’ @ 24x36
1”=220’ @ 12x18
06/08/20
GOP 4 DENSITY

TRANSFER PROJECT

MODIFICATION TO

PRECISE PLAN
09/17/2021
Precise Plan Modifications
20198-07
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345 678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan
Phase 4
South San Francisco, CA 94080
N
GOP 4 PRECISE PLAN
20189-01 FLAD
02/28/2020 FLAD

PROPOSED PRECISE PLAN

EXTENTS
G4-004

GATEWAY OF

PACIFIC
Rev Date Description

SCREENED SERVICE UTILITY YARD PRECISE PLAN AREA

SCREENED SERVICE UTILITY YARD
GOP 5E
APN 015-071-330
PS 4
APN 015-023-200
RAIL SPUR-1
APN 015-071-220
RAIL SPUR-2
APN 015-071-999
GOP 4N
APN 015-023-200
GOP 4S
APN 015-023-200
GOP 5W
APN 015-071-330
PS 5
APN 015-071-330

AMENITY
APN 015-023-470
GOP 1
APN 015-023-470
GOP 2
APN 015-023-450
PS 2
APN 015-023-450
GOP 3
APN 015-023-290
PS 3
APN 015-023-290

OYSTER POINT BLVD

GATEWAY BLVD

ECCLES AVENUE

VETERANS BLVD
N
0’ 55’ 110’ 220’
1”=110’ @ 24x36
1”=220’ @ 12x18
06/08/20
GOP 4 DENSITY

TRANSFER PROJECT

MODIFICATION TO

PRECISE PLAN
09/17/2021
Precise Plan Modifications
20198-07
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345 678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan
N
GOP 4 PRECISE PLAN
20189-07
-

GATEWAY OF

PACIFIC
Rev Date Description
C4-101

BOUNDARY PLAN
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
JJ
KA

GATEWAY OF

PACIFIC
Rev Date Description
Know what's
R
N
20189-07
09/17/2021
Precise Plan Modifications
GOP 4 DENSITY TRANSFER

PROJECT MODIFICATION

TO PRECISE PLAN
Phase 4
South San Francisco, CA 94080
GOP 4 DENSITY

TRANSFER PROJECT

MODIFICATION TO

PRECISE PLAN
09/17/2021
Precise Plan Modifications
20198-07
C4-200

BOUNDARY PLAN
EN
JJ
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345 678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan
Phase 4
South San Francisco, CA 94080
N
GOP 4 PRECISE PLAN
DRAFT
20189-01 Checker
02/28/20 Author
24X36 SAMPLE
X4-YYY

GATEWAY OF

PACIFIC
Rev Date Description
CMG
CMG
GOP 1
BLDG 180 BLDG 200

OYSTER POINT BLVD

SITE CONTEXT
PLAN

GATEWAY BOULEVARD
GOP 4 - N
GOP 4 - S
AMNTY.

BLDG.

GOP 4 - PS

PARK STREET
GOP 3
GOP 2
GOP 2-PS
GOP 3-PS
L4-100
GOP 4 - PRECISE

PLAN BOUNDARY
GOP 5 - E
GOP 5 - W
GOP 5 - PS

OYSTER POINT

ACCESS AREA

CENTRAL SQUARE
50,134 SQ FT.

1.15 ACRES

ENTRY PLAZA DROP-OFF
12,278 SQ FT.
.28 ACRES

PERIPHERAL LANDSCAPE
87,860 SQ FT.
2 ACRES
0 20 40 80 160
06/08/20
GOP 4 DENSITY

TRANSFER PROJECT

MODIFICATION TO

PRECISE PLAN
09/17/2021
Precise Plan Modifications
20198-07
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345 678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan
Phase 4
South San Francisco, CA 94080
N
GOP 4 PRECISE PLAN
DRAFT
20189-01 Checker
02/28/20 Author
24X36 SAMPLE
X4-YYY

GATEWAY OF

PACIFIC
Rev Date Description
CMG
CMG
GOP 4 - N
BLDG 180 BLDG 200
GOP 4 - S

PARK STREET (PRIVATE DRIVE)

AMENITY

BUILDING
GOP-1
GOP 2 - PS
GOP 4 - PS
L4-101

PROPOSED

SITE PLAN
SEE SHEET L4.102
GOP 5 - E
L4-501/502 4
2 1
10 9
8 7
13 14
12 11
6 3
5 1
3 4
5 5
6 14
6 7
8 9
10 11
11 14 13
12 12
12 12
2 Entry Drop-Off Plaza
Entry Plaza
Park Street Landscape
- CIP Concrete retaining walls with landscape buffer planting. - Stormwater treatment areas integrated at base of wall.

Garden Deck/Dining Area
Stage/Seating/Sculpture Platform
- Removable bollards with a curb-less transition to the plaza and building entry plaza. - Concrete unit pavers with seat benches and accent tree groupings. - Vehicular access with drop-off and turn around area.

Central Square
Dining Pavilion
Custom Wood Seating Element
Loading Dock
Garage Entry/ Exit
Groves
Utility/Infrastructure Yard
Parcel Boundary
Garden Edges
Emergency Vehicle Access
LEGEND
- 20’-26’ wide per city standards with mountable curb at Park Street. - City standard fire truck hammerhead turn around at central square. - Wood seating platform with movable seating, potential fire pit, accent lighting and under-story planting.
- The nexus of the campus, connecting the existing campus with the proposed four and five phases. Campus circulation connections to building entry/exit points and amenities spaces are included, along with native and adapted plantings with areas for various campus program. These include, outdoor corporate events, al fresco dining, lounge seating, outdoor meeting spaces, along with opportunities for food and beverage vendors. -Metal trellis with accent lighting and lounge seating
-Potential food and beverage kiosk
-Wood decking with movable and fixed seating elements, accent lighting and native and adapted under-story plantings.
-A continuation of the phase one landscape incorporating storm-water gardens and tree bosques.
-A variety of tree types help to define the edges of the central square and accent architectural facades. Under-story plantings consist of native and adapted plantings that help to define the outdoor rooms and give seasonal interest, along with providing habitat for local fauna.
0 10 20 40 80
06/08/20
GOP 4 DENSITY

TRANSFER PROJECT

MODIFICATION TO

PRECISE PLAN
09/17/2021
Precise Plan Modifications
20198-07
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345 678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan
Phase 4
South San Francisco, CA 94080
N
GOP 4 PRECISE PLAN
DRAFT
20189-01 Checker
02/28/20 Author
24X36 SAMPLE
X4-YYY

GATEWAY OF

PACIFIC
Rev Date Description
CMG
CMG
4 2
2 1
1 3
3 4
5 5
Entry/Exit Access Drive
Surface Parking Lot
Peripheral Landscape
Fire Truck Turnaround
Garage Entry/ Exit
LEGEND
0 10 20 40 80
SEE SHEET L4.101

PROPOSED

SITE PLAN
L4-102
GOP 4 - PS

OYSTER POINT BLVD
BLDG 200
Parcel Boundary
06/08/20
GOP 4 DENSITY

TRANSFER PROJECT

MODIFICATION TO

PRECISE PLAN
09/17/2021
Precise Plan Modifications
20198-07
BUILDING 4S
5-STORIES
112,937 GFA

PARKING STRUCTURE
8 LEVELS
BUILDING 4N
9-STORIES
232,905 GFA

MECHANICAL PENTHOUSE
STAIR

ENCLOSURE
STAIR

ENCLOSURE

MECHANICAL

PENTHOUSE

SERVICE
YARD

SERVICE
YARD

SERVICE
YARD
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345 678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan Modifications
N
GOP 4 DENSITY TRANSFER

PROJECT MODIFICATION

TO PRECISE PLAN
20189-07 FLAD
09/17/2021 FLAD

ARCHITECTURAL SITE
PLAN
A4-100

GATEWAY OF

PACIFIC
1 1" = 30'-0"

SITE PLAN

SITE DATA
0' 15' 30' 60'

PLAN NORTH
TOTAL PARCEL AREAS A,B,C&D: 984,471 SF
TOTAL PARCEL AREAS E&F (RAIL SPURS): 120,221 SF
ALLOWABLE FAR FLOOR AREA (PARCELS A,B,C&D @1.25): 1,230,589 SF ALLOWABLE FAR FLOOR AREA (PARCELS E&F @1.0): 120,221 SF TOTAL ALLOWABLE FAR FLOOR AREA (PARCELS A,B,C,D,E&F): 1,350,810 GFA* TOTAL GOP FAR FLOOR AREA BUILT TO DATE (PHASES 1,2 &3): 1,004,968 GFA*
TOTAL REMAINING GOP4 FAR FLOOR AREA: 345,842
GFA*
BUILDING NORTH: 232,905 GFA*
BUILDING SOUTH: 112,937 GFA*
FAR SHOWN: 1.25
PARKING REQUIRED 772 CARS
* GFA = GROSS FLOOR AREA (COUNTING TOWARDS FAR)
Rev Date Description
GOP 4 DENSITY

TRANSFER PROJECT

MODIFICATION TO

PRECISE PLAN
09/17/2021
Precise Plan Modifications
20198-07

SITE PLAN
A4-301
3 A4-301
2 A4-301
1 A4-302
4 A4-302
3 A4-302
1 A4-302
2 DS
CS
BS
AS
1S
2S
3S
4S
5S
6S
7S
8S
9S
10S
11S
12S
DN
CN
BN
AN
1N 2N 3N 4N 5N 5.7N 6N 7N 7.3N 8N 9N 10N 11N 12N

7.3S

5.7S
LOBBY
LOBBY

LOADING AREA

LOADING AREA

RESTROOMS

OPEN ABOVE

EXTERIOR

SERVICE YARD

EXTERIOR

SERVICE YARD

RESTROOMS

OPEN ABOVE
DROP
OFF
ACCESS

DRIVEWAY

PARK STREET (PRIVATE ACCESS)
41' - 8" 32' - 0" 41' - 8"
21' - 0" 21' - 0" 21' - 0" 21' - 0" 15' - 9" 5' - 3" 10' - 6" 5' - 3" 15' - 9" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 115' - 4"
220' - 6"
21' - 0" 21' - 0" 21' - 0" 21' - 0" 15' - 9" 5' - 3" 10' - 6" 5' - 3" 15' - 9" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 220' - 6"
41' - 8" 32' - 0" 41' - 8"
115' - 4"
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345 678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan
N
GOP 4 PRECISE PLAN
20189-01 FLAD
02/28/2020 FLAD
B4 - LEVEL 01 FLOOR
PLAN
A4-200

GATEWAY OF

PACIFIC
1 1" = 20'-0"
LEVEL 01 FLOOR PLAN
Rev Date Description
06/08/20

LANDS OF

R - RAILROAD SPUR LP
DN. 2018-061652)
A4-301
1 A4-302
2 A4-302
1 A4-303
4 A4-303
3 A4-303
1 A4-303
2 DS
CS
BS
AS
1S
2S
3S
4S
5S
6S
7S
8S
9S
10S
11S
12S

7.3S

5.7S
LOBBY
LOBBY

LOADING AREA

LOADING AREA

RESTROOMS

OPEN ABOVE

EXTERIOR

SERVICE YARD

EXTERIOR

SERVICE YARD

RESTROOMS

OPEN ABOVE
DROP
OFF
ACCESS

DRIVEWAY

PARK STREET (PRIVATE ACCESS)
21' - 0" 21' - 0" 21' - 0" 21' - 0" 15' - 9" 5' - 3" 10' - 6" 5' - 3" 15' - 9" 21' - 0" 21' - 0" 21' - 0" 21' - 0" A4-301
2 DN
CN
BN
AN
1N 2N 3N 4N 5N 7N 8N 9N 10N 11N 12N
225' - 9"
121' - 6"
119' - 8"
21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 41' - 8" 32' - 0" 41' - 8"
234' - 9"
118' - 6"
41' - 8" 32' - 0" 41' - 8"
6N
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345 678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan Modifications
N
GOP 4 DENSITY TRANSFER

PROJECT MODIFICATION

TO PRECISE PLAN
20189-07 FLAD
09/17/2021 FLAD
B4 - LEVEL 01 FLOOR

PLANS NORTH AND SOUTH

BUILDINGS
A4-200

GATEWAY OF

PACIFIC
1 1" = 20'-0"
LEVEL 01 FLOOR PLANS NORTH AND SOUTH

BUILDINGS
Rev Date Description
GOP 4 DENSITY

TRANSFER PROJECT

MODIFICATION TO

PRECISE PLAN
09/17/2021
Precise Plan Modifications
20198-07
B4 - LEVEL 01 FLOOR

PLANS NORTH AND SOUTH

BUILDINGS

NORTH BUILDING

SOUTH BUILDING
A4-301
3 A4-301
2 A4-301
1 A4-302
4 A4-302
3 A4-302
1 A4-302
2 DS
CS
BS
AS
1S
2S
3S
4S
5S
6S
7S
8S
9S
10S
11S
12S
DN
CN
BN
AN
1N 2N 3N 4N 5N 5.7N 6N 7N 7.3N 8N 9N 10N 11N 12N

7.3S

5.7S

RESTROOMS

RESTROOMS
41' - 8" 32' - 0" 41' - 8"
115' - 4"
21' - 0" 21' - 0" 21' - 0" 21' - 0" 15' - 9" 5' - 3" 10' - 6" 5' - 3" 15' - 9" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 220' - 6"
21' - 0" 21' - 0" 21' - 0" 21' - 0" 15' - 9" 5' - 3" 10' - 6" 5' - 3" 15' - 9" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 220' - 6"
41' - 8" 32' - 0" 41' - 8"
115' - 4"
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan
N
GOP 4 PRECISE PLAN
20189-01 FLAD
02/28/2020 FLAD
B4 - LEVEL 05 FLOOR
PLAN
A4-204

GATEWAY OF

PACIFIC
1 1" = 20'-0"
LEVEL 05 FLOOR PLAN
Rev Date Description
06/08/20
A4-301
1 A4-302
2 A4-302
1 A4-303
4 A4-303
3 A4-303
1 A4-303
2 DS
CS
BS
AS
1S
2S
3S
4S
5S
6S
7S
8S
9S
10S
11S
12S

7.3S

5.7S

RESTROOMS
21' - 0" 21' - 0" 21' - 0" 21' - 0" 15' - 9" 5' - 3" 10' - 6" 5' - 3" 15' - 9" 21' - 0" 21' - 0" 21' - 0" 21' - 0"

RESTROOMS

OPEN TO
BELOW
A4-301
2 DN
CN
BN
AN
1N 2N 3N 4N 5N 7N 8N 9N 10N 11N 12N
21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 41' - 8" 32' - 0" 41' - 8"
123' - 1"
41' - 8" 32' - 0" 41' - 8"
130' - 1"
225' - 9"
249' - 8"
6N
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345 678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan Modifications
N
GOP 4 DENSITY TRANSFER

PROJECT MODIFICATION

TO PRECISE PLAN
20189-07 FLAD
09/17/2021 FLAD
B4 - LEVEL 05 FLOOR

PLANS NORTH AND SOUTH

BUILDINGS
A4-204

GATEWAY OF

PACIFIC
1 1" = 20'-0"
LEVEL 05 FLOOR PLANS NORTH AND SOUTH

BUILDINGS
Rev Date Description
GOP 4 DENSITY

TRANSFER PROJECT

MODIFICATION TO

PRECISE PLAN
09/17/2021
Precise Plan Modifications
20198-07
B4 - LEVEL 05 FLOOR

PLANS NORTH AND SOUTH

BUILDINGS

NORTH BUILDING

SOUTH BUILDING
A4-301
3 A4-301
2 A4-301
1 A4-302
4 A4-302
3 A4-302
1 A4-302
2 DS
CS
BS
AS
1S
2S
3S
4S
5S
6S
7S
8S
9S
10S
11S
12S
DN
CN
BN
AN
1N 2N 3N 4N 5N 5.7N 6N 7N 7.3N 8N 9N 10N 11N 12N

7.3S

5.7S

RESTROOMS

RESTROOMS
41' - 8" 32' - 0" 41' - 8"
115' - 4"
21' - 0" 21' - 0" 21' - 0" 21' - 0" 15' - 9" 5' - 3" 10' - 6" 5' - 3" 15' - 9" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 220' - 6"
21' - 0" 21' - 0" 21' - 0" 21' - 0" 15' - 9" 5' - 3" 10' - 6" 5' - 3" 15' - 9" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 220' - 6"
41' - 8" 32' - 0" 41' - 8"
115' - 4"
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan
N
GOP 4 PRECISE PLAN
20189-01 FLAD
02/28/2020 FLAD
B4 - LEVEL 05 FLOOR
PLAN
A4-204

GATEWAY OF

PACIFIC
1 1" = 20'-0"
LEVEL 05 FLOOR PLAN
Rev Date Description
06/08/20
A4-301
1 A4-302
2 A4-302
1 A4-303
4 A4-303
3 A4-303
1 A4-303
2 DS
CS
BS
AS
1S
2S
3S
4S
5S
6S
7S
8S
9S
10S
11S
12S

7.3S

5.7S

RESTROOMS

OPEN TO
BELOW
A4-301
2 DN
CN
BN
AN
1N 2N 3N 4N 5N 7N 8N 9N 10N 11N 12N
21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 15' - 9" 5' - 3" 10' - 6" 5' - 3" 15' - 9" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 41' - 8" 32' - 0" 41' - 8"
123' - 1"
41' - 8" 32' - 0" 41' - 8"
130' - 1"
225' - 9"
249' - 8"
6N
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345 678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan Modifications
N
GOP 4 DENSITY TRANSFER

PROJECT MODIFICATION

TO PRECISE PLAN
20189-07
09/17/2021
B4 - LEVEL 06 FLOOR

PLAN NORTH BUILDING

PENTHOUSE LEVEL SOUTH

BUILDING
A4-205

GATEWAY OF

PACIFIC
1 1" = 20'-0"
LEVEL 6 FLOOR PLAN NORTH BUILDING

PENTHOUSE LEVEL SOUTH BUILDING
Rev Date Description
GOP 4 DENSITY

TRANSFER PROJECT

MODIFICATION TO

PRECISE PLAN
09/17/2021
Precise Plan Modifications
20198-07
A4-205
B4 - LEVEL 06 FLOOR

PLAN NORTH BUILDING

PENTHOUSE LEVEL SOUTH

BUILDING

NORTH BUILDING

SOUTH BUILDING
A4-301
3 A4-301
2 A4-301
1 A4-302
4 A4-302
3 A4-302
1 A4-302
2 DS
CS
BS
AS
1S
2S
3S
4S
5S
6S
7S
8S
9S
10S
11S
12S
DN
CN
BN
AN
1N 2N 3N 4N 5N 5.7N 6N 7N 7.3N 8N 9N 10N 11N 12N

7.3S

5.7S

RESTROOMS

RESTROOMS
41' - 8" 32' - 0" 41' - 8"
115' - 4"
21' - 0" 21' - 0" 21' - 0" 21' - 0" 15' - 9" 5' - 3" 10' - 6" 5' - 3" 15' - 9" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 220' - 6"
21' - 0" 21' - 0" 21' - 0" 21' - 0" 15' - 9" 5' - 3" 10' - 6" 5' - 3" 15' - 9" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 220' - 6"
41' - 8" 32' - 0" 41' - 8"
115' - 4"
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan
N
GOP 4 PRECISE PLAN
20189-01 FLAD
02/28/2020 FLAD
B4 - LEVEL 05 FLOOR
PLAN
A4-204

GATEWAY OF

PACIFIC
1 1" = 20'-0"
LEVEL 05 FLOOR PLAN
Rev Date Description
06/08/20
A4-301
1 A4-302
2 A4-302
1 RESTROOMS
A4-301
2 DN
CN
BN
AN
1N 2N 3N 4N 5N 7N 8N 9N 10N 11N 12N
21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 41' - 8" 32' - 0" 41' - 8"
123' - 1"
235' - 9"
6N
DS
CS
BS
AS
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345 678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan Modifications
N
GOP 4 DENSITY TRANSFER

PROJECT MODIFICATION

TO PRECISE PLAN
20189-07 Checker
09/17/2021 Author
B4 - LEVEL 07 FLOOR

PLAN NORTH BUILDING
A4-206

GATEWAY OF

PACIFIC
1 1" = 20'-0"
LEVEL 07 FLOOR PLAN NORTH BUILDING
Rev Date Description
A4-301
1 A4-302
2 A4-302
1 A4-303
4 A4-303
3 A4-303
1 A4-303
2 DS
CS
BS
AS
1S
2S
3S
4S
5S
6S
7S
8S
9S
10S
11S
12S

7.3S

5.7S

RESTROOMS

OPEN TO
BELOW
A4-301
2 DN
CN
BN
AN
1N 2N 3N 4N 5N 6N 7N 8N 9N 10N 11N 12N
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345 678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan Modifications
N
GOP 4 DENSITY TRANSFER

PROJECT MODIFICATION

TO PRECISE PLAN
20189-07
09/17/2021
B4 - LEVEL 06 FLOOR

PLAN NORTH BUILDING

PENTHOUSE LEVEL SOUTH

BUILDING
A4-205

GATEWAY OF

PACIFIC
Rev Date Description
GOP 4 DENSITY

TRANSFER PROJECT

MODIFICATION TO

PRECISE PLAN
09/17/2021
Precise Plan Modifications
20198-07
A4-206
B4 - LEVEL 07 FLOOR

PLAN NORTH BUILDING

NORTH BUILDING

PENTHOUSE ROOF

STAIR ENCLOSURE
DRAFT
A4-301
3 A4-301
2 A4-301
1 A4-302
4 A4-302
3 A4-302
1 A4-302
2 DS
CS
BS
AS
1S
2S
3S
4S
5S
6S
7S
8S
9S
10S
11S
12S
DN
CN
BN
AN
1N 2N 3N 4N 5N 5.7N 6N 7N 7.3N 8N 9N 10N 11N 12N

7.3S

5.7S

RESTROOMS

RESTROOMS
41' - 8" 32' - 0" 41' - 8"
115' - 4"
21' - 0" 21' - 0" 21' - 0" 21' - 0" 15' - 9" 5' - 3" 10' - 6" 5' - 3" 15' - 9" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 220' - 6"
21' - 0" 21' - 0" 21' - 0" 21' - 0" 15' - 9" 5' - 3" 10' - 6" 5' - 3" 15' - 9" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 220' - 6"
41' - 8" 32' - 0" 41' - 8"
115' - 4"
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan
N
GOP 4 PRECISE PLAN
20189-01 FLAD
02/28/2020 FLAD
B4 - LEVEL 05 FLOOR
PLAN
A4-204

GATEWAY OF

PACIFIC
1 1" = 20'-0"
LEVEL 05 FLOOR PLAN
Rev Date Description
06/08/20

RESTROOMS
A4-301
2 A4-302
2 A4-301
1 A4-302
1 DN
CN
BN
AN
1N 2N 3N 4N 5N 7N 8N 9N 10N 11N 12N
21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 41' - 8" 32' - 0" 41' - 8"
123' - 1"
236' - 1"
6N
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345 678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan Modifications
N
GOP 4 DENSITY TRANSFER

PROJECT MODIFICATION

TO PRECISE PLAN
20189-07 Checker
09/17/2021 Author
B4 - LEVEL 08 FLOOR

PLAN NORTH BUILDING
A4-207

GATEWAY OF

PACIFIC
1 1" = 20'-0"
LEVEL 08 FLOOR PLAN NORTH BUILDING
Rev Date Description
GOP 4 DENSITY

TRANSFER PROJECT

MODIFICATION TO

PRECISE PLAN
09/17/2021
Precise Plan Modifications
20198-07
A4-207
B4 - LEVEL 08 FLOOR

PLANS NORTH BUILDING

NORTH BUILDING

OUTLINE OF

SOUTH BUILDING
A4-301
3 A4-301
2 A4-301
1 A4-302
4 A4-302
3 A4-302
1 A4-302
2 DS
CS
BS
AS
1S
2S
3S
4S
5S
6S
7S
8S
9S
10S
11S
12S
DN
CN
BN
AN
1N 2N 3N 4N 5N 5.7N 6N 7N 7.3N 8N 9N 10N 11N 12N

7.3S

5.7S

RESTROOMS

RESTROOMS
41' - 8" 32' - 0" 41' - 8"
115' - 4"
21' - 0" 21' - 0" 21' - 0" 21' - 0" 15' - 9" 5' - 3" 10' - 6" 5' - 3" 15' - 9" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 220' - 6"
21' - 0" 21' - 0" 21' - 0" 21' - 0" 15' - 9" 5' - 3" 10' - 6" 5' - 3" 15' - 9" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 220' - 6"
41' - 8" 32' - 0" 41' - 8"
115' - 4"
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan
N
GOP 4 PRECISE PLAN
20189-01 FLAD
02/28/2020 FLAD
B4 - LEVEL 05 FLOOR
PLAN
A4-204

GATEWAY OF

PACIFIC
1 1" = 20'-0"
LEVEL 05 FLOOR PLAN
Rev Date Description
06/08/20

RESTROOMS
A4-301
2 A4-302
2 A4-301
1 A4-302
1 DN
CN
BN
AN
1N 2N 3N 4N 5N 7N 8N 9N 10N 11N 12N
21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 41' - 8" 32' - 0" 41' - 8"
123' - 1"
236' - 1"
6N
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345 678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan Modifications
N
GOP 4 DENSITY TRANSFER

PROJECT MODIFICATION

TO PRECISE PLAN
20189-07
09/17/2021
B4 - LEVEL 09 FLOOR

PLAN NORTH BUILDING
A4-208

GATEWAY OF

PACIFIC
1 1" = 20'-0"
LEVEL 09 FLOOR PLAN NORTH BUILDING
Rev Date Description
GOP 4 DENSITY

TRANSFER PROJECT

MODIFICATION TO

PRECISE PLAN
09/17/2021
Precise Plan Modifications
20198-07
A4-208
B4 - LEVEL 09 FLOOR

PLANS NORTH BUILDING

NORTH BUILDING

OUTLINE OF

SOUTH BUILDING
A4-301
3 A4-301
2 A4-301
1 A4-302
4 A4-302
3 A4-302
1 A4-302
2 DS
CS
BS
AS
1S
2S
3S
4S
5S
6S
7S
8S
9S
10S
11S
12S
DN
CN
BN
AN
1N 2N 3N 4N 5N 5.7N 6N 7N 7.3N 8N 9N 10N 11N 12N

7.3S

5.7S

RESTROOMS

RESTROOMS
41' - 8" 32' - 0" 41' - 8"
115' - 4"
21' - 0" 21' - 0" 21' - 0" 21' - 0" 15' - 9" 5' - 3" 10' - 6" 5' - 3" 15' - 9" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 220' - 6"
21' - 0" 21' - 0" 21' - 0" 21' - 0" 15' - 9" 5' - 3" 10' - 6" 5' - 3" 15' - 9" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 220' - 6"
41' - 8" 32' - 0" 41' - 8"
115' - 4"
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan
N
GOP 4 PRECISE PLAN
20189-01 FLAD
02/28/2020 FLAD
B4 - LEVEL 05 FLOOR
PLAN
A4-204

GATEWAY OF

PACIFIC
1 1" = 20'-0"
LEVEL 05 FLOOR PLAN
Rev Date Description
06/08/20

MECHANICAL

PENTHOUSE

EXTERIOR

ROOF AREA
A4-301
2 A4-302
2 A4-301
1 A4-302
1 DN
CN
BN
AN
1N 2N 3N 4N 5N 7N 8N 9N 10N 11N 12N
21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 41' - 8" 32' - 0" 41' - 8"
123' - 1"
236' - 1"
6N
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345 678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan Modifications
N
GOP 4 DENSITY TRANSFER

PROJECT MODIFICATION

TO PRECISE PLAN
20189-07 FLAD
09/17/2021 FLAD
B4 - PENTHOUSE FLOOR

PLAN NORTH BUILDING
A4-209

GATEWAY OF

PACIFIC
1 1" = 20'-0"

PENTHOUSE LEVEL FLOOR PLAN NORTH

BUILDING
Rev Date Description
GOP 4 DENSITY

TRANSFER PROJECT

MODIFICATION TO

PRECISE PLAN
09/17/2021
Precise Plan Modifications
20198-07
A4-209
B4 - LEVEL 1 PENTHOUSE

FLOOR PLAN NORTH

BUILDING

NORTH BUILDING

OUTLINE OF

SOUTH BUILDING
A4-301
3 A4-301
2 A4-301
1 A4-302
4 A4-302
3 A4-302
1 A4-302
2 DS
CS
BS
AS
1S
2S
3S
4S
5S
6S
7S
8S
9S
10S
11S
12S
DN
CN
BN
AN
1N 2N 3N 4N 5N 5.7N 6N 7N 7.3N 8N 9N 10N 11N 12N

7.3S

5.7S
41' - 8" 32' - 0" 41' - 8"
115' - 4"
21' - 0" 21' - 0" 21' - 0" 21' - 0" 15' - 9" 5' - 3" 10' - 6" 5' - 3" 15' - 9" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 220' - 6"
21' - 0" 21' - 0" 21' - 0" 21' - 0" 15' - 9" 5' - 3" 10' - 6" 5' - 3" 15' - 9" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 220' - 6"
41' - 8" 32' - 0" 41' - 8"
115' - 4"

MECHANICAL

PENTHOUSE

EXTERIOR

ROOF AREA

EXTERIOR

ROOF AREA

MECHANICAL

PENTHOUSE
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan
N
GOP 4 PRECISE PLAN
20189-01 FLAD
02/28/2020 FLAD
B4 - PENTHOUSE FLOOR
PLAN
A4-205

GATEWAY OF

PACIFIC
1 1" = 20'-0"

PENTHOUSE LEVEL FLOOR PLAN
Rev Date Description
06/08/20

PENTHOUSE
ROOF
STAIR

ENCLOSURE
A4-301
2 A4-302
2 A4-301
1 A4-302
1 DN
CN
BN
AN
1N 2N 3N 4N 5N 7N 8N 9N 10N 11N 12N
21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 41' - 8" 32' - 0" 41' - 8"
123' - 1"
236' - 1"
6N
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345 678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan Modifications
N
GOP 4 DENSITY TRANSFER

PROJECT MODIFICATION

TO PRECISE PLAN
20189-07 FLAD
09/17/2021 FLAD
B4 - ROOF PLAN NORTH

BUILDING
A4-211

GATEWAY OF

PACIFIC
1 1" = 20'-0"

ROOF PLAN NORTH BUILDING
Rev Date Description
GOP 4 DENSITY

TRANSFER PROJECT

MODIFICATION TO

PRECISE PLAN
09/17/2021
Precise Plan Modifications
20198-07
A4-211
B4 - ROOF PLAN NORTH

BUILDING

NORTH BUILDING

OUTLINE OF

SOUTH BUILDING
1 2
A4-320
2 1
A4-330
1 A4-330
A4-320
1 C C
B B
3 A A
4 A4-321
1 A4-321
2 2
A4-330
-
5 6 7 8 9 10 11 12 13 14 15 16 17
A.2
A.5
B.6
21 22
B.4
B.1
A.6
A.4
A.1
B.7
B.5
B.3
B.2
A.3

RAMP UP
V V

EV-VA EV-A
AMB
3 A4-330
3 A4-330
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Stamps & Approvals
H
F
E
D
C
B
A
2345 678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan
Phase 4
South San Francisco, CA 94080
GOP 4 PRECISE PLAN
19309 Checker
02/28/2020 Author

GROUND LEVEL FLOOR
PLAN
Gateway of
Pacific
1 SCALE: 1/16" = 1'-0"

GROUND LEVEL FLOOR PLAN
Rev Date Description
Project Key Plan
N

GROUND LEVEL FLOOR
PLAN
PS4 - GROUND LEVEL

FLOOR PLAN
A4-221
06/08/20
PA4-321
1 1
PA4-331
1 PA4-331
PA4-321
2 PA4-322
1 PA4-322
2 3
PA4-331
3 PA4-331

RAMP UP
VV

EV-VA EV-A
AMB
STAIR
01 ELEV
01 STAIR
02 ELEV
02 2
PA4-331
2 PA4-331
ELEC.

ROOM
BIKE
ROOM

RAMP DN
A.7 A.8
A.9 A.9
A.10 A.10
A.11
A.12 A.12
A.13 A.14 A.15 A.16 A.17 A.18 A.19 A.20 A.21 A.22 A.23 A.24 A.25 A.26 A.27
A.28
A.29
A.30 A.31
A.32
A.33
A.34
A.35
A.36
A.37
A.38
A.39
A.40
A.41
10' - 3" 10' - 9" 15' - 0"
126' - 0"
16' - 9" 13' - 11 3/8" 12' - 6 1/8" 12' - 6 1/8" 12' - 6 1/8" 11' - 6 1/8" 126' - 0"
14' - 10" 14' - 10" 14' - 10" 18' - 4" 18' - 4" 18' - 4" 18' - 4" 18' - 4" 18' - 4" 18' - 4" 18' - 4" 9' - 8" 8' - 8" 18' - 4" 18' - 4" 8' - 8" 9' - 8" 18' - 4" 282' - 10"
16' - 9"
10' - 3" 21' - 6" 21' - 0" 21' - 0" 16' - 3"
2' - 4" 27' - 2"

SHEET NOTE

1. FLOOR ELEVATIONS SHOWN ARE TO THE TOP OF STRUCTURAL
SLAB UNLESS OTHERWISE NOTED.

2. SEE SHEET TO FOR STRIPING, SIGNS AND
GRAPHIC INFORMATION.

3. COORDINATE STRUCTURAL WITH SPRINKLER DESIGN AND
LAYOUT. PROVIDE SLEEVE LOCATION(S) AS NECESSARY.

4. PROVIDE MEDIUM BROOM FINISH OVER CONCRETE WHERE
ELASTOMERIC CATING OCCURS.

5. ALL EXPOSED EXTERIOR SURFACES AND ALL INTERIOR

SURFACES (WALLS, COLUMNS, BEAMS AND SOFFITS) TO BE
PAINTED, COLOR TO BE SELECTD BY ARCHITECT.

6. SEE SHEET FOR DOOR SCHEDULE AND DETAILS.

7. SEE SHEET FOR WALL TYPE SCHEDULE.

Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345 678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan
N
GOP 4 PRECISE PLAN
19309 Checker
01/20/15 Author

GROUND LEVEL FLOOR
PLAN
PA4-221
Gateway of
Pacific
1 SCALE: 1/16" = 1'-0"

GROUND LEVEL FLOOR PLAN
Rev Date Description
GOP 4 DENSITY

TRANSFER PROJECT

MODIFICATION TO

PRECISE PLAN
09/17/2021
Precise Plan Modifications
20198-07
A4-320
A4-320
A4-321
A4-321
3 3
4 2
A4-320
A4-320
A4-321 A4-321
1 2
3 3
09/17/2021
20198-07
CMG
CMG
1 2
A4-320
2 1
A4-330
1 A4-330
A4-320
1 C C
B B
3 A A
4 A4-321
1 A4-321
2 2
A4-330
2 A4-330
-
5 6 7 8 9 10 11 12 13 14 15 16 17
A.2
A.5
B.6
21 22
B.4
B.1
A.6
A.4
A.1
B.7
B.5
B.3
B.2
A.3

RAMP DN RAMP UP
3 A4-330
3 A4-330
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Stamps & Approvals
H
F
E
D
C
B
A
2345678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan
Phase 4
South San Francisco, CA 94080
GOP 4 PRECISE PLAN
19309 Checker
02/28/2020 Author

FIFTH LEVEL FLOOR PLAN
Gateway of
Pacific
1 SCALE: 1/16" = 1'-0"

FIFTH LEVEL FLOOR PLAN
Rev Date Description
Project Key Plan
N
FIFTH LEVEL FLOOR PLAN PS4 - FIFTH LEVEL

FLOOR PLAN
A4-225
06/08/20
UP
UP
PA4-321
1 1
PA4-331
1 PA4-331
PA4-321
2 PA4-322
1 PA4-322
2 3
PA4-331
3 PA4-331
STAIR
01 ELEV
01 ELEV
02 2
PA4-331
2 PA4-331

RAMP DN RAMP UP

RAMP DN
A.7 A.8
A.9 A.9
A.10 A.10
A.11
A.12 A.12
A.13 A.14 A.15 A.16 A.17 A.18 A.19 A.20 A.21 A.22 A.23 A.24 A.25 A.26 A.27
A.28
A.29
A.30 A.31
A.32
A.33
A.34
A.35
A.36
A.37
A.38
A.39
A.40
A.41
10' - 3" 10' - 9" 15' - 0"
126' - 0"
16' - 9" 13' - 11 3/8" 12' - 6 1/8" 12' - 6 1/8" 12' - 6 1/8" 11' - 6 1/8" 126' - 0"
14' - 10" 14' - 10" 14' - 10" 18' - 4" 18' - 4" 18' - 4" 18' - 4" 18' - 4" 18' - 4" 18' - 4" 18' - 4" 9' - 8" 8' - 8" 18' - 4" 18' - 4" 8' - 8" 9' - 8" 18' - 4" 282' - 10"
16' - 9"
10' - 3" 21' - 6" 21' - 0" 21' - 0" 16' - 3"
2' - 4" 27' - 2"
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan
N
GOP 4 PRECISE PLAN
19309 Checker
01/10/20 Author

SIXTH LEVEL FLOOR PLAN
PA4-226
Gateway of
Pacific
1 SCALE: 1/16" = 1'-0"

SIXTH LEVEL FLOOR PLAN
Rev Date Description
GOP 4 DENSITY

TRANSFER PROJECT

MODIFICATION TO

PRECISE PLAN
09/17/2021
Precise Plan Modifications
20198-07
A4-226
PS4 - SIXTH LEVEL

FLOOR PLAN
A4-320
A4-320
A4-321
A4-321
3 3
4 2
A4-320
A4-320
A4-321 A4-321
1 2
3 3
CMG
CMG
1 2
A4-320
2 1
A4-330
1 A4-330
A4-320
1 C C
B B
3 A A
4 A4-321
1 A4-321
2 2
A4-330
2 A4-330
-
5 6 7 8 9 10 11 12 13 14 15 16 17
A.2
A.5
B.6
21 22
B.4
B.1
A.6
A.4
A.1
B.7
B.5
B.3
B.2
A.3

RAMP DN RAMP UP
3 A4-330
3 A4-330
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Stamps & Approvals
H
F
E
D
C
B
A
2345678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan
Phase 4
South San Francisco, CA 94080
GOP 4 PRECISE PLAN
19309 Checker
02/28/2020 Author

FIFTH LEVEL FLOOR PLAN
Gateway of
Pacific
1 SCALE: 1/16" = 1'-0"

FIFTH LEVEL FLOOR PLAN
Rev Date Description
Project Key Plan
N
FIFTH LEVEL FLOOR PLAN PS4 - FIFTH LEVEL

FLOOR PLAN
A4-225
06/08/20
UP
PA4-321
1 1
PA4-331
1 PA4-331
PA4-321
2 PA4-322
1 PA4-322
2 3
PA4-331
3 PA4-331
2 PA4-331
2 PA4-331

RAMP DN RAMP UP

RAMP DN
A.7 A.8
A.9 A.9
A.10 A.10
A.11
A.12
A.13 A.14 A.15 A.16 A.17 A.18 A.19 A.20 A.21 A.22 A.23 A.24 A.25 A.26 A.27
A.28
A.29
A.30 A.31
A.32
A.33
A.34
A.35
A.36
A.37
A.38
A.39
A.40
A.41
10' - 3" 10' - 9" 15' - 0"
126' - 0"
16' - 9" 13' - 11 3/8" 12' - 6 1/8" 12' - 6 1/8" 12' - 6 1/8" 11' - 6 1/8" 126' - 0"
14' - 10" 14' - 10" 14' - 10" 18' - 4" 18' - 4" 18' - 4" 18' - 4" 18' - 4" 18' - 4" 18' - 4" 18' - 4" 9' - 8" 8' - 8" 18' - 4" 18' - 4" 8' - 8" 9' - 8" 18' - 4" 282' - 10"
16' - 9"
10' - 3" 21' - 6" 21' - 0" 21' - 0" 16' - 3"
2' - 4" 27' - 2"
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan
N
GOP 4 PRECISE PLAN
19309 Checker
09/02/21 Author

SEVENTH LEVEL FLOOR
PLAN
PA4-227
Gateway of
Pacific
1 SCALE: 1/16" = 1'-0"

SEVENTH LEVEL FLOOR PLAN
Rev Date Description
GOP 4 DENSITY

TRANSFER PROJECT

MODIFICATION TO

PRECISE PLAN
09/17/2021
Precise Plan Modifications
20198-07
A4-227
PS4 - SEVENTH LEVEL

FLOOR PLAN
A4-320
A4-320
A4-321
A4-321
3 3
4 2
A4-320
A4-320
A4-321 A4-321
1 2
3 3
CMG
CMG
1 2
A4-320
2 1
A4-330
1 A4-330
A4-320
1 C C
B B
3 A A
4 A4-321
1 A4-321
2 2
A4-330
2 A4-330
-
5 6 7 8 9 10 11 12 13 14 15 16 17
A.2
A.5
B.6
21 22
B.4
B.1
A.6
A.4
A.1
B.7
B.5
B.3
B.2
A.3

RAMP DN
3 A4-330
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Stamps & Approvals
H
F
E
D
C
B
A
2345678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan
Phase 4
South San Francisco, CA 94080
GOP 4 PRECISE PLAN
19309 Checker
02/28/2020 Author

SIXTH (ROOF) LEVEL

FLOOR PLAN
Gateway of
Pacific
1 SCALE: 1/16" = 1'-0"

SIXTH (ROOF) LEVEL FLOOR PLAN
Rev Date Description
Project Key Plan
N

SIXTH (ROOF) LEVEL

FLOOR PLAN
PS4 - SIXTH (ROOF) LEVEL

FLOOR PLAN
A4-226
06/08/20
UP
PA4-321
1 1
PA4-331
1 PA4-331
PA4-321
2 PA4-322
1 PA4-322
2 3
PA4-331
3 PA4-331
2 PA4-331
2 PA4-331

RAMP DN

RAMP DN
A.7 A.8
A.9 A.9
A.10 A.10
A.11
A.12
A.13 A.14 A.15 A.16 A.17 A.18 A.19 A.20 A.21 A.22 A.23 A.24 A.25 A.26 A.27
A.28
A.29
A.30 A.31
A.32
A.33
A.34
A.35
A.36
A.37
A.38
A.39
A.40
A.41

OPEN TO BELOW
10' - 3" 10' - 9" 15' - 0"
126' - 0"
16' - 9" 13' - 11 3/8" 12' - 6 1/8" 12' - 6 1/8" 12' - 6 1/8" 11' - 6 1/8" 126' - 0"
14' - 10" 14' - 10" 14' - 10" 18' - 4" 18' - 4" 18' - 4" 18' - 4" 18' - 4" 18' - 4" 18' - 4" 18' - 4" 9' - 8" 8' - 8" 18' - 4" 18' - 4" 8' - 8" 9' - 8" 18' - 4" 282' - 10"
16' - 9"
10' - 3" 21' - 6" 21' - 0" 21' - 0" 16' - 3"
2' - 4" 27' - 2"
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan
N
GOP 4 PRECISE PLAN
19309 Checker
03/17/20 Author

EIGHTH (ROOF) LEVEL

FLOOR PLAN
PA4-228
Gateway of
Pacific
1 SCALE: 1/16" = 1'-0"

EIGHTH (ROOF) LEVEL PLAN
Rev Date Description
GOP 4 DENSITY

TRANSFER PROJECT

MODIFICATION TO

PRECISE PLAN
09/17/2021
Precise Plan Modifications
20198-07
A4-228
PS4 - EIGHTH (ROOF)

LEVEL FLOOR PLAN
A4-320
A4-320
A4-321
A4-321
3 3
4 2
A4-320
A4-320
A4-321 A4-321
1 2
3 3
CMG
CMG
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan
Phase 4
South San Francisco, CA 94080
N
GOP 4 PRECISE PLAN
20189-01 FLAD
02/28/2020 FLAD

OVERALL ELEVATION
A4-300

GATEWAY OF

PACIFIC
Rev Date Description
06/08/20
GOP 4 DENSITY

TRANSFER PROJECT

MODIFICATION TO

PRECISE PLAN
09/17/2021
Precise Plan Modifications
20198-07
BUILDING GOP 4 NORTH
BUILDING GOP 4 NORTH BUILDING GOP 4 SOUTH

PARKING STRUCTURE
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345 678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan
Phase 4
South San Francisco, CA 94080
N
GOP 4 PRECISE PLAN
20189-01 FLAD
02/28/2020 FLAD
GOP 4&5 RENDERING
A4-300A

GATEWAY OF

PACIFIC
Rev Date Description
06/08/20
GOP 4 DENSITY

TRANSFER PROJECT

MODIFICATION TO

PRECISE PLAN
09/17/2021
Precise Plan Modifications
20198-07
GOP 4&5 SITE RENDERING
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan
Phase 4
South San Francisco, CA 94080
N
GOP 4 PRECISE PLAN
20189-01 FLAD
02/28/2020 FLAD
GOP 4 RENDERING
A4-300C

GATEWAY OF

PACIFIC

LOW IRON GLASS

EXTERIOR WOOD PLANK

METAL COLUMN COVER

HIGH PERFORMANCE SOLAR

GLASS - TINTED

SHADOW BOX

SPANDREL - TINTED

METAL FIN
Rev Date Description
06/08/20
GOP 4 DENSITY

TRANSFER PROJECT

MODIFICATION TO

PRECISE PLAN
09/17/2021
Precise Plan Modifications
20198-07
A4-300B
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan
Phase 4
South San Francisco, CA 94080
N
GOP 4 PRECISE PLAN
20189-01 FLAD
02/28/2020 FLAD
GOP 4 RENDERING
A4-300C

GATEWAY OF

PACIFIC

LOW IRON GLASS

EXTERIOR WOOD PLANK

METAL COLUMN COVER

HIGH PERFORMANCE SOLAR

GLASS - TINTED

SHADOW BOX

SPANDREL - TINTED

METAL FIN
Rev Date Description
06/08/20
GOP 4 DENSITY

TRANSFER PROJECT

MODIFICATION TO

PRECISE PLAN
09/17/2021
Precise Plan Modifications
20198-07
A4-300C
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan
Phase 4
South San Francisco, CA 94080
N
GOP 4 PRECISE PLAN
20189-01 FLAD
02/28/2020 FLAD
GOP 4 RENDERING
A4-300C

GATEWAY OF

PACIFIC

LOW IRON GLASS

EXTERIOR WOOD PLANK

METAL COLUMN COVER

HIGH PERFORMANCE SOLAR

GLASS - TINTED

SHADOW BOX

SPANDREL - TINTED

METAL FIN
Rev Date Description
06/08/20
GOP 4 DENSITY

TRANSFER PROJECT

MODIFICATION TO

PRECISE PLAN
09/17/2021
Precise Plan Modifications
20198-07
A4-300D
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan
Phase 4
South San Francisco, CA 94080
N
GOP 4 PRECISE PLAN
20189-01 FLAD
02/28/2020 FLAD
GOP 4 RENDERING
A4-300C

GATEWAY OF

PACIFIC

LOW IRON GLASS

EXTERIOR WOOD PLANK

METAL COLUMN COVER

HIGH PERFORMANCE SOLAR

GLASS - TINTED

SHADOW BOX

SPANDREL - TINTED

METAL FIN
Rev Date Description
06/08/20
GOP 4 DENSITY

TRANSFER PROJECT

MODIFICATION TO

PRECISE PLAN
09/17/2021
Precise Plan Modifications
20198-07
A4-300E
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345 678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan
Phase 4
South San Francisco, CA 94080
N
GOP 4 PRECISE PLAN
DRAFT
20189-01 FLAD
02/28/2020 FLAD
B4 NORTH - EXTERIOR

ELEVATIONS
A4-301

GATEWAY OF

PACIFIC
Rev Date Description

HIGH-PERFORMANCE SOLAR

GLASS - TINTED

HIGH-PERFORMANCE SOLAR

GLASS - TINTED

SHADOW BOX SPANDREL
- TINTED

LOW IRON GLASS

GFRC PANEL

METAL FIN

SHADOW BOX SPANDREL - LOW IRON

OVERHEAD COILING DOOR

METAL COLUMN COVER

CLEAR GLASS GUARDRAIL

CLEAR GLASS GUARDRAIL

METAL COLUMN COVER

REVOLVING DOOR

LOW IRON GLASS METAL FINS

SHADOW BOX SPANDREL - TINTED

HIGH-PERFORMANCE SOLAR

GLASS - TINTED

GFRC PANEL

METAL FINS

SHADOW BOX SPANDREL -
TINTED

CLEAR GLASS GUARDRAIL

METAL COLUMN COVER

LOW IRON GLASS

CLEAR GLASS GUARDRAIL

METAL COLUMN COVER

SHADOW BOX SPANDREL -
TINTED

METAL FINS

REVOLVING DOOR

LOW IRON GLASS

SHADOW BOX SPANDREL -

LOW IRON

HIGH-PERFORMANCE SOLAR

GLASS - TINTED

ENLARGED LOADING DOCK VIEW -
1/A4-307
06/08/20
G
1 Project Key Plan
Stamps & Approvals
H
F
E
2345 678

NOT FOR

CONSTRUCTION
N
DRAFT

HIGH-PERFORMANCE SOLAR

GLASS - TINTED

HIGH-PERFORMANCE SOLAR

GLASS - TINTED

SHADOW BOX SPANDREL
- TINTED

LOW IRON GLASS

GFRC PANEL

METAL FIN

SHADOW BOX SPANDREL - LOW IRON

OVERHEAD COILING DOOR

METAL COLUMN COVER

CLEAR GLASS GUARDRAIL

CLEAR GLASS GUARDRAIL

METAL COLUMN COVER

REVOLVING DOOR

LOW IRON GLASS METAL FINS

SHADOW BOX SPANDREL - TINTED

ENLARGED LOADING DOCK VIEW -
1/A4-307
100’ - 0”
Level 1 - GOP 4
118’ - 0”
Level 2 - GOP 4
134 - 0”
Level 3 - GOP 4
150 - 0”
Level 4 - GOP 4
166’ - 0”
Level 5 - GOP 4
182 - 0”
Level 6- GOP 4
198’ - 0”
Level 7 - GOP 4
214’ - 0”
Level 8 - GOP 4
230’ - 0”
Level 9 - GOP 4
246’ - 0”

PENTHOUSE -
GOP 4
262’ - 0”
T.O. PARAPET -
GOP 4

HIGH-PERFORMANCE SOLAR

GLASS - TINTED

CLEAR GLASS GUARDRAIL

REVOLVING DOOR

LOW IRON GLASS

METAL FINS

SHADOW BOX SPANDREL -
TINTED

SHADOW BOX SPANDREL -

LOW IRON
100’ - 0”
Level 1 - GOP 4
118’ - 0”
Level 2 - GOP 4
134 - 0”
Level 3 - GOP 4
150 - 0”
Level 4 - GOP 4
166’ - 0”
Level 5 - GOP 4
182 - 0”
Level 6- GOP 4
198’ - 0”
Level 7 - GOP 4
214’ - 0”
Level 8 - GOP 4
230’ - 0”
Level 9 - GOP 4
246’ - 0”

PENTHOUSE -
GOP 4
262’ - 0”
T.O. PARAPET -
GOP 4

HIGH-PERFORMANCE SOLAR

GLASS - TINTED

CLEAR GLASS GUARDRAIL

REVOLVING DOOR

LOW IRON GLASS

METAL FINS

SHADOW BOX SPANDREL -
TINTED

SHADOW BOX SPANDREL -

LOW IRON
2 1
GOP 4 DENSITY

TRANSFER PROJECT

MODIFICATION TO

PRECISE PLAN
09/17/2021
Precise Plan Modifications
20198-07
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345 678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan
Phase 4
South San Francisco, CA 94080
N
GOP 4 PRECISE PLAN
DRAFT
20189-01 FLAD
02/28/2020 FLAD
B4 NORTH - EXTERIOR

ELEVATIONS
A4-301

GATEWAY OF

PACIFIC
Rev Date Description

HIGH-PERFORMANCE SOLAR

GLASS - TINTED

HIGH-PERFORMANCE SOLAR

GLASS - TINTED

SHADOW BOX SPANDREL
- TINTED

LOW IRON GLASS

GFRC PANEL

METAL FIN

SHADOW BOX SPANDREL - LOW IRON

OVERHEAD COILING DOOR

METAL COLUMN COVER

CLEAR GLASS GUARDRAIL

CLEAR GLASS GUARDRAIL

METAL COLUMN COVER

REVOLVING DOOR

LOW IRON GLASS METAL FINS

SHADOW BOX SPANDREL - TINTED

HIGH-PERFORMANCE SOLAR

GLASS - TINTED

GFRC PANEL

METAL FINS

SHADOW BOX SPANDREL -
TINTED

CLEAR GLASS GUARDRAIL

METAL COLUMN COVER

LOW IRON GLASS

CLEAR GLASS GUARDRAIL

METAL COLUMN COVER

SHADOW BOX SPANDREL -
TINTED

METAL FINS

REVOLVING DOOR

LOW IRON GLASS

SHADOW BOX SPANDREL -

LOW IRON

HIGH-PERFORMANCE SOLAR

GLASS - TINTED

ENLARGED LOADING DOCK VIEW -
1/A4-307
06/08/20
100’ - 0”
Level 1 - GOP 4
118’ - 0”
Level 2 - GOP 4
134 - 0”
Level 3 - GOP 4
150 - 0”
Level 4 - GOP 4
166’ - 0”
Level 5 - GOP 4
182 - 0”
Level 6- GOP 4
198’ - 0”
Level 7 - GOP 4
214’ - 0”
Level 8 - GOP 4
230’ - 0”
Level 9 - GOP 4
246’ - 0”

PENTHOUSE -
GOP 4
262’ - 0”
T.O. PARAPET -
GOP 4

HIGH-PERFORMANCE SOLAR

LOW IRON GLASS GLASS - TINTED

METAL FINS

SHADOW BOX SPANDREL -
TINTED

SHADOW BOX SPANDREL -

LOW IRON
100’ - 0”
Level 1 - GOP 4
118’ - 0”
Level 2 - GOP 4
134 - 0”
Level 3 - GOP 4
150 - 0”
Level 4 - GOP 4
166’ - 0”
Level 5 - GOP 4
182 - 0”
Level 6- GOP 4
198’ - 0”
Level 7 - GOP 4
214’ - 0”
Level 8 - GOP 4
230’ - 0”
Level 9 - GOP 4
246’ - 0”

PENTHOUSE -
GOP 4
262’ - 0”
T.O. PARAPET -
GOP 4

HIGH-PERFORMANCE SOLAR

GLASS - TINTED

METAL COLUMN COVER

LOW IRON GLASS

METAL FINS

SHADOW BOX SPANDREL -
TINTED

SHADOW BOX SPANDREL -

LOW IRON
GOP 4 DENSITY

TRANSFER PROJECT

MODIFICATION TO

PRECISE PLAN
09/17/2021
Precise Plan Modifications
20198-07
A4-302
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan
Phase 4
South San Francisco, CA 94080
N
GOP 4 PRECISE PLAN
DRAFT
20189-01 FLAD
02/28/2020 FLAD
B4 SOUTH - EXTERIOR

ELEVATIONS
A4-302

GATEWAY OF

PACIFIC
Rev Date Description

HIGH-PERFORMANCE SOLAR

GLASS - TINTED

CLEAR GLASS GUARDRAIL

METAL COLUMN COVER

REVOLVING DOOR

LOW IRON GLASS

METAL FINS

SHADOW BOX SPANDREL -
TINTED

SHADOW BOX SPANDREL -

LOW IRON

METAL COLUMN COVER

LOW IRON GLASS

CLEAR GLASS GUARDRAIL

SHADOW BOX SPANDREL -
TINTED

GFRC PANEL

HIGH-PERFORMANCE SOLAR

GLASS - TINTED

METAL FINS

REVOLVING DOOR

LOW IRON GLASS

HIGH-PERFORMANCE SOLAR

GLASS - TINTED

SHADOW BOX SPANDREL -
TINTED

METAL FINS

METAL COLUMN COVER

CLEAR GLASS GUARDRAIL

SHADOW BOX SPANDREL -

LOW IRON

GFRC PANEL

OVERHEAD COILING DOOR

METAL FINS

SHADOW BOX SPANDREL -

LOW IRON

CLEAR GLASS GUARDRAIL

METAL COLUMN COVER

HIGH-PERFORMANCE SOLAR

GLASS - TINTED

SHADOW BOX SPANDREL -
TINTED

ENLARGED LOADING DOCK VIEW -
2/A4-307
06/08/20

REVOLVING DOOR

LOW IRON GLASS

HIGH-PERFORMANCE SOLAR

GLASS - TINTED

SHADOW BOX SPANDREL -
TINTED

METAL FINS

METAL COLUMN COVER

CLEAR GLASS GUARDRAIL

SHADOW BOX SPANDREL -

LOW IRON
100’ - 0”
Level 1 - GOP 4
118’ - 0”
Level 2 - GOP 4
134 - 0”
Level 3 - GOP 4
150 - 0”
Level 4 - GOP 4
166’ - 0”
Level 5 - GOP 4
182 - 0”
Level 6- GOP 4

GFRC PANEL

OVERHEAD COILING DOOR

METAL FINS

SHADOW BOX SPANDREL -

LOW IRON

CLEAR GLASS GUARDRAIL

METAL COLUMN COVER

HIGH-PERFORMANCE SOLAR

GLASS - TINTED

SHADOW BOX SPANDREL -
TINTED
100’ - 0”
Level 1 - GOP 4
118’ - 0”
Level 2 - GOP 4
134 - 0”
Level 3 - GOP 4
150 - 0”
Level 4 - GOP 4
166’ - 0”
Level 5 - GOP 4
182 - 0”
Level 6- GOP 4

REVOLVING DOOR

LOW IRON GLASS

HIGH-PERFORMANCE SOLAR

GLASS - TINTED

SHADOW BOX SPANDREL -
TINTED

METAL FINS

METAL COLUMN COVER

CLEAR GLASS GUARDRAIL

SHADOW BOX SPANDREL -

LOW IRON
100’ - 0”
Level 1 - GOP 4
118’ - 0”
Level 2 - GOP 4
134 - 0”
Level 3 - GOP 4
150 - 0”
Level 4 - GOP 4
166’ - 0”
Level 5 - GOP 4
182 - 0”
Level 6- GOP 4

HIGH-PERFORMANCE SOLAR

GLASS - TINTED

CLEAR GLASS GUARDRAIL

METAL COLUMN COVER

REVOLVING DOOR

LOW IRON GLASS

METAL FINS

SHADOW BOX SPANDREL -
TINTED

SHADOW BOX SPANDREL -

LOW IRON
100’ - 0”
Level 1 - GOP 4
118’ - 0”
Level 2 - GOP 4
134 - 0”
Level 3 - GOP 4
150 - 0”
Level 4 - GOP 4
166’ - 0”
Level 5 - GOP 4
182 - 0”
Level 6- GOP 4
GOP 4 DENSITY

TRANSFER PROJECT

MODIFICATION TO

PRECISE PLAN
09/17/2021
Precise Plan Modifications
20198-07
A4-303
GOP 4 DENSITY

TRANSFER PROJECT

MODIFICATION TO

PRECISE PLAN
09/17/2021
Precise Plan Modifications
20198-07
39' - 0"
Level 1 - GOP 4
77' - 2"

FOURTH LEVEL
PLAN
97' - 6"

SIXTH LEVEL

FLOOR PLAN
67' - 0"

THIRD LEVEL -
PS4
56' - 10"

SECOND LEVEL -
PS4
45' - 6"

GROUND LEVEL -
PS4
87' - 6"

FIFTH LEVEL -
PS4
107' - 8"
LEVEL 7 - PS 4
117' - 10"
LEVEL 8 - PS 4

EXTRUDED METAL SLATS TO MATCH GOP
PARKING STRUCTURE 2&3 PRECISE PLAN

METAL SCREEN TO MATCH

GOP PARKING STRUCTURE
2&3 PRECISE PLAN

PARKING GARAGE FACADE AT ELEVATORS

AND STAIRS (GLASS CURTAINWALL) TO
MATCH GOP PARKING STRUCTURE 2&3

PRECISE PLAN
77' - 2"

FOURTH LEVEL
PLAN
97' - 6"

SIXTH LEVEL

FLOOR PLAN
67' - 0"

THIRD LEVEL -
PS4
56' - 10"

SECOND LEVEL -
PS4
45' - 6"

GROUND LEVEL -
PS4
87' - 6"

FIFTH LEVEL -
PS4
107' - 8"
LEVEL 7 - PS 4
117' - 10"
LEVEL 8 - PS 4
77' - 2"

FOURTH LEVEL
PLAN
97' - 6"

SIXTH LEVEL

FLOOR PLAN
67' - 0"

THIRD LEVEL -
PS4
56' - 10"

SECOND LEVEL -
PS4
45' - 6"

GROUND LEVEL -
PS4
87' - 6"

FIFTH LEVEL -
PS4
107' - 8"
LEVEL 7 - PS 4
117' - 10"
LEVEL 8 - PS 4
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345 67 8
12345 67 8

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan
N
GOP 4 PRECISE PLAN
20189-07 FLAD
02/28/2020 FLAD
PARKING STRUCTURE 4

EXTERIOR WALL SECTIONS
A4-321

GATEWAY OF

PACIFIC
1 3/16" = 1'-0"
PS4 - WALL SECTION 3 1" = 20'-0"PS4 - LONGITUDINAL SECTION 4 1" = 20'-0"
PS4 - CROSS SECTION
Rev Date Description
GOP 4 DENSITY

TRANSFER PROJECT

MODIFICATION TO

PRECISE PLAN
09/17/2021
Precise Plan Modifications
20198-07
Project Title
Drawn By
Rev. No.

Checked By
Date
Project Phase
Project Number
Sheet Title
Sheet Number
G
1 Project Key Plan
Stamps & Approvals
H
F
E
D
C
B
A
2345678
12345678

NOT FOR

CONSTRUCTION
601 Gateway Boulevard, Suite 1145
South San Francisco, CA 94080
Precise Plan
Phase 4
South San Francisco, CA 94080
N
GOP 4 PRECISE PLAN
20189-01 FLAD
02/28/2020 FLAD

SITE CROSS SECTION
A4-400

GATEWAY OF

PACIFIC
Rev Date Description
06/08/20
GOP 4 DENSITY

TRANSFER PROJECT

MODIFICATION TO

PRECISE PLAN
09/17/2021
Precise Plan Modifications
20198-07

SITE CROSS SECTIONS
GOP 3 PARKING STRUCTURE
GOP 2 PARKING STRUCTURE
GOP 3
GOP 2 SOUTH
GOP 2 NORTH

AMENITY BUILDING

GATEWAY BLVD

PARK AVENUE

OYSTER POINT BLVD

ECCLES AVENUE
PHASE 2
PHASE 3
PHASE 1
PHASE 2
PHASE 4
GOP 1
NORTH
GOP 4A
NORTH GOP 4

PARKING

STRUCTURE
GOP 5

PARKING

STRUCTURE
GOP 4B
SOUTH
GOP 5E
EAST
GOP 5W
WEST
GOP 1
SOUTH
B.02 : Primary Entry Identification
B.03 : Secondary Entry Identification
B.04 : Tenant ID Freestanding
B.05 : Occupant Branding Identification
TEN.02 : Tenant ID (Eyebrow)
DIR.02 : Vehicular Directional
DIR.03 : Pedestrian Directional/Directory
R.01-.09 : Regulatory (stop, HC, fire, code...)
TEN.01 : Tenant ID @ Building Skyline
PHASE 5
W4-100
PHASE 4

SIGN LOCATION PLAN
(PRELIMINARY)
JP
JP
07/23/20
GOP 4 DENSITY

TRANSFER PROJECT

MODIFICATION TO

PRECISE PLAN
09/17/2021
Precise Plan Modifications
20198-07
W4-102
PHASE 4

SIGN VISIBILITY
(PRELIMINARY)
JP
JP
07/23/20
Letter Visibility For Building Mounted Tenant Identification Many factors such as design composition, contrast, lighting, site lines, etc. contribute to optimal legibility for building mounted tenant ientification using logos and type. The main requirement for optimal legibility is determining the correct letter/logo size that will properly communicate the identity message to the probable viewing locations. 1000 ft viewing distance = minimum required 43“ letter height 500 ft viewing distance = minimum required 22” letter height Major tenants will size and display their logo / name after considering the viewing distance, the allowable square footage, and the visual impact on the surrounding environment.

Letter Visibility For Building Mounted Tenant Identification Daylight letter visibility, white on dark background Daylight letter visibility, dark on light background with day/night vinyl faces
Night letter visibility will show internally illuminated White faces.

ABC Company ABC Company
500 ft 1000 ft
500 ft
GOP 4
North
GOP 4
GOP 5
South
West
GOP 5
East
PS 4
PS 5
500 ft
1000 ft
1000 ft
GOP 4 DENSITY

TRANSFER PROJECT

MODIFICATION TO

PRECISE PLAN
09/17/2021
Precise Plan Modifications
20198-07

ABC COMPANY
TEN.01 : Tenant ID @ Building Skyline
This sign type is located at the building roofline
but not above the roofline. The purpose of this
sign is to identify the major building occupants
from a greater viewing distance. Tenant logo use
is acceptable. Exact location along bldg. top to
be determined with selected tenant.

This sign type is approximately 225 Square Feet
and should be taken into consideration as
an Allowable Modification to the master program
as a unifying wayfinding sign for the campus
during Phase 4 and subsequent phases.

QTY : 1 Sign Per Elevation
GOP 4 NORTH / NORTH ELEVATION
Fabricated aluminum individual channel letters/logos
with face lit or halo lit warm white illumination,
letters/logos are concealed mounted to building
facade without exposed rails or attachments

ABC COMPANY
W4-103
PHASE 4

SIGN ELEVATION
(PRELIMINARY)
JP
JP
07/23/20

BUILDING TOP SIGNAGE
LIMIT 2 PER TOWER

LETTERS/LOGOS NOT ALLOWED ABOVE ROOF LINE
225' - 0" ( North Tower )
225 +- TOTAL SQ FT - NORTH ELEVATION / 1 SQ. FT. PER LINEAR FT. OF BUILDING FRONTAGE ALLOWED PER SSF SIGN ORDINANCE - TABLE 20.360.008 GOP 4N
GOP 4S
GOP 4 DENSITY

TRANSFER PROJECT

MODIFICATION TO

PRECISE PLAN
09/17/2021
Precise Plan Modifications
20198-07
TEN.01 : Tenant ID @ Building Skyline
This sign type is located at the building roofline
but not above the roofline. The purpose of this
sign is to identify the major building occupants
from a greater viewing distance. Tenant logo use
is acceptable. Exact location along bldg. top to
be determined with selected tenant.

This sign type is approximately 120 Square Feet
and should be taken into consideration as
an Allowable Modification to the master program
as a unifying wayfinding sign for the campus
during Phase 4 and subsequent phases.

QTY : 1 Sign Per Elevation
GOP 4 NORTH / EAST ELEVATION GOP 4 NORTH / WEST ELEVATION Fabricated aluminum individual channel letters/logos
with face lit or halo lit warm white illumination,
letters/logos are concealed mounted to building
facade without exposed rails or attachments

ABC COMPANY

ABC COMPANY ABC COMPANY
W4-104
PHASE 4

SIGN ELEVATION
(PRELIMINARY)
JP
JP
07/23/20
120' - 0" ( North Tower )
120 +- TOTAL SQ FT - EAST ELEVATION /
1 SQ. FT. PER LINEAR FT. OF BUILDING FRONTAGE ALLOWED PER SSF SIGN ORDINANCE - TABLE 20.360.008 GOP 4N
GOP 4S
GOP 4N
GOP 4S

BUILDING TOP SIGNAGE
LIMIT 2 PER TOWER

LETTERS/LOGOS NOT ALLOWED ABOVE ROOF LINE
120' - 0" ( North Tower )
120 +- TOTAL SQ FT - EAST ELEVATION /
1 SQ. FT. PER LINEAR FT. OF BUILDING FRONTAGE ALLOWED PER SSF SIGN ORDINANCE - TABLE 20.360.008

LETTERS/LOGOS NOT ALLOWED ABOVE ROOF LINE
GOP 4 DENSITY

TRANSFER PROJECT

MODIFICATION TO

PRECISE PLAN
09/17/2021
Precise Plan Modifications
20198-07

ABC COMPANY
Fabricated aluminum individual channel letters/logos
with face lit or halo lit warm white illumination,
letters/logos are concealed mounted to building
facade without exposed rails or attachments
TEN.01 : Tenant ID @ Building Skyline
This sign type is located at the building roofline
but not above the roofline. The purpose of this
sign is to identify the major building occupants
from a greater viewing distance. Tenant logo use
is acceptable. Exact location along bldg. top to
be determined with selected tenant.

This sign type is approximately 225 Square Feet
and should be taken into consideration as
an Allowable Modification to the master program
as a unifying wayfinding sign for the campus
during Phase 4 and subsequent phases.

QTY : 1 Sign Per Elevation
GOP 4 NORTH / SOUTH ELEVATION

ABC COMPANY
W4-105
PHASE 4

SIGN ELEVATION
(PRELIMINARY)
JP
JP
07/23/20

BUILDING TOP SIGNAGE
LIMIT 2 PER TOWER

LETTERS/LOGOS NOT ALLOWED ABOVE ROOF LINE
225' - 0" ( North Tower )
225 +- TOTAL SQ FT - SOUTH ELEVATION / 1 SQ. FT. PER LINEAR FT. OF BUILDING FRONTAGE ALLOWED PER SSF SIGN ORDINANCE - TABLE 20.360.008 GOP 4N
GOP 4S
GOP 4 DENSITY

TRANSFER PROJECT

MODIFICATION TO

PRECISE PLAN
09/17/2021
Precise Plan Modifications
20198-07
TEN.02 : Tenant ID (Eyebrow)
This sign type is located at the base of the building.

The purpose of this sign is to identify the major
building occupants. Tenant logo use is acceptable.

Exact location along bldg. base to determined
This sign type is approximately 22 Square Feet
and should be taken into consideration as
an Allowable Modification to the master program
as a unifying wayfinding sign for the campus
during Phase 4 and subsequent phases.

QTY : 1 / 2 Signs Per Elevation
(dependent on final tenant occupancy)
GOP 4 NORTH / EAST ELEVATION GOP 4 NORTH / WEST ELEVATION Materials: Brushed Stainless Steel or similar materials that match architectural finishes.

Square Footage: Overall area of Tenant Eyebrow Signage
not to exceed 22 sq. feet.

ABC COMPANY

ABC COMPANY

ABC COMPANY
W4-106
PHASE 4

SIGN ELEVATION
(PRELIMINARY)
JP
JP
07/23/20

EYEBROW SIGNAGE
LETTERS/LOGOS NOT TO EXCEED 22 TOTAL SQ FT.
120' - 0" ( North Tower ) 120' - 0" ( North Tower )
GOP 4N
GOP 4S
GOP 4N
GOP 4S
LETTERS/LOGOS NOT TO EXCEED 22 TOTAL SQ FT.

GOP 4 DENSITY

TRANSFER PROJECT

MODIFICATION TO

PRECISE PLAN
09/17/2021
Precise Plan Modifications
20198-07