Cities Index.
Exhibit D - Draft and Previously Approved Conditions of Approval

South San Francisco City Council
July 13, 2022

Document
Exhibit D - Draft and Previously Approved Conditions of Approval
Meeting
July 13, 2022
Body
South San Francisco City Council
Original file
19.5 MB
Text extracted from the city's file for reading and search. Open the original on ci-ssf-ca.legistar1.com. That file is the official record.

CONDITIONS OF APPROVAL
P21-0084: GPA21-0003, ZA21-0001, MPM21-0001,
SPA21-0001, PPM21-0001 and DAA22-0002
GATEWAY OF PACIFIC – PHASE 4 DENSITY TRANSFER PROJECT
(Recommended by City Staff on June 2, 2022)
The Applicant/Project shall conform to all the conditions of approval identified in City Council Resolution 44-2013 and Planning Commission Resolution 2859-2020, as modified and supplemented below.

A. PLANNING DIVISION

1. Condition A.1 is modified such that, in lieu of the plan set dated June 8, 2020, the project shall be constructed and operated substantially as indicated on the plan set prepared by Flad Architects dated September 17, 2021 and approved by the City Council in association with P21-0084 as amended by the conditions of approval. The final plans shall be subject to the review and approval of the City’s Chief Planner.

2. Condition A.2 is modified such that, in addition to addressing Design Review Board comments from 2020, the applicant also shall address Design Review Board comments from 2021. Prior to the issuance of any building or construction permits for the project, the applicant shall revise the development plans to address all Design Review Board comments, subject to review and approval by the Chief Planner or designee. The Design Review Board comments are those set forth in the Design Review Board Comment Letter dated May 11, 2020 regarding 850-900 Gateway and Design Review Board Recommendations dated October 29, 2021 regarding 900 Gateway Boulevard.

3. Condition A.3 is modified such that, in addition to complying with all applicable mitigation measures outlined in the adopted Mitigation Monitoring and Reporting Program for the 2020 Addendum / 2009 EIR for the Gateway of Pacific Phase 4 Revised Project (Exhibit E-1), the project also shall comply with the Gateway of the Pacific 4 Density Transfer Project Supplemental EIR Mitigation and Monitoring Program (Exhibit E-2), which imposes additional mitigation applicable to the expansion approved for the GOP 4 Density Transfer Project. The Applicant/Project shall comply with all applicable mitigation measures outlined in the adopted Mitigation Monitoring and Reporting Program for the 2022 Supplemental EIR / 2009 EIR for the Gateway of Pacific Phase 4 Density Transfer Project including constructing any improvements required by such measures.

4. Condition A.4 is modified such that in lieu of complying with the Second Amendment, the applicant shall comply with all terms and conditions specified in the Second Amended and Restated Development Agreement, as amended by the First, Second and Third Amendments to that Agreement.

5. Prior to issuance of a building permit for the expansion square footage in the GOP 4 North building, the applicant shall implement a density transfer as permitted by section 2.2 of the amended Master Plan. The applicant shall do so by recording a covenant or deed, in a form acceptable to the City Attorney, on adjacent property that restricts development on that adjacent property. The restriction shall reduce the allowed intensity of development on that adjacent property by the number of square feet (up to 120,221 square feet) by which GOP 4 will cause the GOP Master Plan site to exceed 1.25 FAR.

6. The applicant shall construct a multi-use path and crossings in accordance with Mitigation Measure 3.1-1 of the 2022 Supplemental EIR. The crossing shall be constructed at the northern and southern ends of the multi-use path, at Forbes Boulevard and Oyster Point Boulevard, in the configuration determined necessary by the City Engineer for bicycle access from those streets to the multi-use path. The applicant shall construct such improvements prior to the issuance of first occupancy permit, or within a reasonable timeframe acceptable to the City upon such time as public agencies have granted all necessary approvals for the construction and the applicant has been given the right to construct on any land owned by others that is necessary for said construction.

7. Prior to the issuance of any building or construction permits for the expansion square footage in the GOP 4 North building, the applicant shall file Form 7460-1 with the Federal Aviation Administration (FAA) and provide an FAA “Determination of No Hazard” to the Chief Planner.

8. The applicant shall comply with the real estate disclosure requirements outlined in Policy IP-1 of the Comprehensive Airport Land Use Compatibility Plan for the Environs of San Francisco International Airport, which states as follows:

IP-1 AIRPORT INFLUENCE AREA A – REAL ESTATE DISCLOSURE AREA.

Within Area A, the real estate disclosure requirements of state law apply. Section 11010 of the Business and Professions Code requires people offering subdivided property for sale or lease to disclose the presence of all existing and planned airports within two miles of the property. The law requires that, if the property is within an “airport influence area” designated by the airport land use commission, the following statement must be included in the notice of intention to offer the property for sale:

NOTICE OF AIRPORT IN VICINITY. This property is presently located in the vicinity of an airport, within what is known as an airport influence area. For that reason, the property may be subject to some of the annoyances or inconveniences associated with proximity to airport operations (for example: noise, vibration, or odors). Individual sensitivities to those annoyances can vary from person to person.

You may wish to consider what airport annoyances, if any, are associated with the property before you complete your purchase and determine whether they are acceptable to you.

B. FIRE PREVENTION
Permits

1. New and existing buildings shall be provided with approved illuminated or other approved means of address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numerals or alphabetic letters. Numbers shall not be spelled out. Character size and stroke shall be in accordance with CFC Section 505.1.1 through 505.1.2. Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response in accordance with this code and CFC Section 505.1.3. Where access is by means of a private road and the building cannot be viewed from the public way or when determined by the fire code official, a monument, pole, or other approved illuminated sign or other approved means shall be used to identify the structure(s). Address identification shall be maintained.

2. An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises on which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction, in accordance with CFC Section 507, Appendices B & C.
a. Fire-flow requirements for buildings or portions of buildings and facilities shall be determined by adopted CFC Appendix B.
b. Fire hydrant systems shall comply with adopted CFC Section 507.5.1 through 507.5.8 and Appendix C.

3. Fire apparatus access roads shall be provided and maintained in accordance with CFC Section 503 and Appendix D.
a. Approved fire apparatus access roads shall be provided for every facility, building or portion of a building hereafter constructed or moved into or within the jurisdiction. The fire apparatus access road shall extend to within 150 feet of all portions of the facility and all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building or facility.
i. Developer shall provide a site plan exhibit indicating compliance with these requirements to the fire department prior to approval. ii. Traffic calming measures (bollards, speed bumps, humps, undulations, etc.) are not approved as a part of this review and require specific approval from the Fire Department.
iii. Should a security gate be planned to serve the facility, the gate design shall be submitted directly to the Fire Department for fire permit review. The gate shall be equipped with a Knox Company key operated electric gate release switch. During a power failure, gate shall release for manual operation OR be equipped with standby power or connected to the building emergency panel. In addition to sending the request to exit signal to the gate operator, the magnetic detection loop (when activated) shall prohibit the gate from closing upon fire apparatus.
b. Commercial and industrial developments with buildings or facilities exceeding 30 feet or three stories in height or 62,000 square feet shall have not fewer than two means of fire apparatus access for each structure. Where two fire apparatus access roads are required, they shall be placed a distance apart equal to not less than one half of the length of the maximum overall diagonal dimension of the lot or area to be served, measured in a straight line between accesses. c. Where the vertical distance between the grade-plane and the highest roof surface exceeds 30-feet, approved aerial fire apparatus access roads shall be provided in accordance with CFC D105. For purposes of this requirement, the highest roof surface shall be determined by measurement to the eave of a pitched roof, the intersection of the roof to the exterior wall, or the top of parapet walls, whichever is greater. Aerial fire apparatus access roads shall have a minimum unobstructed width of 26 feet, exclusive of shoulders, in the immediate vicinity of the building or portion thereof. One or more of the required access routes meeting this condition shall be located not less than 15-feet and not greater than 30-feet from the building and shall be positioned parallel to one entire long-side of the building or as approved by the fire code official. The side of the building on which the aerial fire apparatus access road is positioned shall be approved by the fire code official.

Overhead utility and power lines shall not be located over the aerial fire apparatus access road or between the aerial fire apparatus road and the building. There shall be no architectural features, projections or obstructions that would limit the articulation of the aerial apparatus.
d. Required Fire Department access roads shall be signed “No Parking – Fire Lane” per current Fire Department standards and California Vehicle Code (CVC) Section 22500.
e. A Fire Department key box shall be provided on the front of each structure for access to fire protection equipment within the building

4. The provisions of the adopted CFC shall specify where fire protection and life safety systems are required and shall apply to the design, installation, inspection, operation, testing and maintenance of all fire protection systems. a. Approved automatic fire sprinkler systems in new buildings and structures shall be provided in the locations described in adopted CFC Sections 903.2.1 through 903.2.20. Approved automatic fire sprinkler systems in existing buildings and structures shall be provided in locations described in adopted CFC Section 903.6. i. Structure(s) will be required to be protected by an automatic fire sprinkler system.

1. If required Fire Department Connection (FDC) for the sprinkler and/or standpipe systems shall be located on the addressed street side of the structure or facing approved fire apparatus access roadway fully visible and recognizable from the street, and within 100 feet an approved fire hydrant.
b. Structure(s) will be required to install a standpipe system in the building. i. Not less than one standpipe shall be provided for use during construction.

Such standpipes shall be installed prior to construction exceeding 40 feet in height above the lowest level of fire department vehicle access. Such standpipes shall be provided with fire department hose connections at floorlevel locations adjacent to stairways as construction progresses, such standpipes shall be extended to within one floor of the highest point of construction having secured decking or flooring.

5. The following are a list of typical fire construction deferred plan submittal items that are required by the Fire Department - additional items may be called out based on subsequent construction permit reviews. The applicant shall provide and meet these requirements. a. Private Underground Fire Mains & Fire Hydrants
b. Standpipe System
c. Fire Sprinkler System
d. Fire Alarm/Fire Sprinkler Monitoring System
e. Fire Pump (to be determined)
f. Smoke Control Systems (to be determined)
g. Emergency Responder Radio System (to be determined)
h. Gates and barricades across fire apparatus access roads (to be determined) 2013 and 2020 Adopted Conditions of Approval

RESOLUTION NO. 2859-2020

PLANNING COMMISSION, CITY OF SOUTH SAN FRANCISCO

STATE OF CALIFORNIA

RESOLUTION MAKING FINDINGS AND APPROVING A PRECISE PLAN AND DESIGN REVIEW FOR THE DEVELOPMENT OF PHASE 4 OF THE GATEWAY BUSINESS PARK MASTER PLAN PROJECT AT 850-900 GATEWAY BOULEVARD IN THE GATEWAY SPECIFIC PLAN DISTRICT.

WHEREAS, in 2010 the City of South San Francisco (“City”) adopted (1) Resolution No. 18-2010 certifying the 2009 Environmental Impact Report (“2009 EIR”) (State Clearinghouse No. 2008062059), (2) Resolution No. 19-2010 approving a general plan amendment and transportation demand management (TDM) program, (3) Ordinance No. 1422-2010 amending Chapters 20.57 and 20.120 of the Zoning Ordinance, and (4) Ordinance No. 1423-2010 approving a development agreement with Chamberlin Associates, for the construction of five to six R&D/ Office buildings, two to four parking structures, and related improvements on an approximately 22.6-acre site located at 700-1000 Gateway Boulevard; and
WHEREAS, in 2013 the City adopted (1) Resolution No. 43-2013 making findings and relying on the previously certified 2009 EIR and incorporating such EIR by reference, (2) Resolution No. 44- 2013 approving modifications to the Gateway Business Park Master Plan, a new Phase 1 Precise Plan, and modifications to the TDM program, and (3) Ordinance No. 1471-2013 adopting a First Amended and Restated Development Agreement with Gateway of Pacific LP (“BioMed Realty”); and
WHEREAS, in 2018 the City adopted Resolution No. 1559-2018 adopting a Second Amended and Restated Development Agreement with BMR Gateway of Pacific I LP (formerly BMR-700 Gateway LP), BMR Gateway of Pacific II LP (formerly BMR-750, 800, 850 Gateway LP), BMR Gateway of Pacific III LP (formerly BMR-900 Gateway LP), and BMR Gateway of Pacific IV LP (formerly BMR-1000 Gateway LP) (“BioMed Realty”); and
WHEREAS, in 2018 the Planning Commission of the City of South San Francisco adopted Resolution No. 2834-2018 determining that the Gateway of Pacific Phase 2-3 Precise Plans Project was fully within the scope of environmental analysis in the 2009 EIR and that the 2018 Addendum to the EIR was the appropriate environmental document for the Project; and WHEREAS, BioMed Realty (“Owner” or “Applicant”) submitted an application requesting approval of a Precise Plan and Design Review to construct Phase 4 of the Gateway Business Park Master Plan (“Project”); and
WHEREAS, approval of the Applicant’s proposal is considered a “project” for purposes of the California Environmental Quality Act, Pub. Resources Code § 21000, et seq. (“CEQA”) and the Planning Commission has considered the environmental impacts by separate resolution; and WHEREAS, the applicant seeks approval of Precise Plan (PP20-0001) and Design Review (DR20-0013) for the Project; and
WHEREAS, the Planning Commission held a properly noticed public hearing on August 6, 2020, to solicit public comment and take public testimony, at which time interested parties had the opportunity to be heard, to consider the Precise Plan and Design Review; and WHEREAS, the Planning Commission exercised its independent judgment and analysis, and considered all reports, recommendations and testimony before making a determination on the Project.

NOW THEREFORE, based on the entirety of the record before it, which includes without limitation, the California Environmental Quality Act, Public Resources Code §21000, et seq. (“CEQA) and the CEQA Guidelines, 14 California Code of Regulations §15000, et seq.; the South San Francisco General Plan, and General Plan Environmental Impact Report; the South San Francisco Municipal Code; 2009 EIR, and associated Mitigation Monitoring and Reporting Programs; 2018 Addendum to the 2009 EIR; the Project applications; the BMR GOP Phase 4 Precise Plan, as prepared by Flad Architects, dated June 8, 2020; all site plans, and all reports, minutes, and public testimony submitted as part of the Planning Commission’s duly noticed August 6, 2020 meeting; and any other evidence (within the meaning of Public Resources Code §21080(e) and §21082.2), the Planning Commission of the City of South San Francisco hereby finds as follows:

A. General Findings

1. The foregoing recitals are true and correct and made a part of this Resolution.

2. The Exhibits attached to this Resolution, including the Conditions of Project Approval (Exhibit A) and the Precise Plan (attached as Exhibit B) are each incorporated by reference as if they were each set forth fully herein.

3. The documents and other material constituting the record for these proceedings are located at the Planning Division for the City of South San Francisco, 315 Maple Avenue, South San Francisco, CA 94080, and in the custody of the Planning Manager.

B. Gateway Precise Plan

1. The Phase 4 Precise Plan is compatible with the intent and purpose of the Gateway Specific Plan because the overall Master Plan promotes campus-style uses, such as biotechnology, high- technology and research and development uses, and the proposed buildings in Phase 4 will form a working campus environment and include high quality pedestrian circulation and open spaces.

2. The proposed development and/or construction standards of the Phase 4 Precise Plan are designed to achieve compliance with the development and/or construction standards of the Gateway Specific Plan because the site layout and overall architecture will help shape the urban character of the East of 101 Area, the overall Master Plan FAR of 1.25 is consistent with the Gateway Specific Plan and the proposed building heights will be below the 250-foot maximum allowable height limit. The Precise Plan includes high quality architecture that continues the aesthetic of Phases 1-3, and the Phase 4 Precise Plan has been designed appropriately to allow for incremental development while maintaining a functioning working environment for those areas on the site that have not yet been developed.

3. The Phase 4 Precise Plan is consistent with the first amendment to the second amended and restated development agreement because it clarifies and obligates several Project features and mitigation measures including transportation impact fees, public improvements in the East of 101 area, Fire Department obligations, phasing, provision for child care, park in-lieu fees, and TDM reporting and monitoring requirements.

4. The Phase 4 Precise Plan is consistent with the City of South San Francisco General Plan. The 1999 General Plan includes policies and programs that are designed to encourage the development of high technology campuses in the East of 101 Area, allow for employee-serving vendor services, preparation of a TDM plan and traffic improvement plan to reduce congestion impacts, and provision of a framework for requiring future circulation system improvements as they are needed to prevent deficient levels of service from being reached. The Precise Plan consists of a high technology campus, allows for employee serving vendor services, and will be in keeping with the previously approved TDM plan and traffic improvement plans.

C. Design Review

1. The Project, including Design Review, is consistent with Title 20 of the South San Francisco Municipal Code because the Project has been designed as a high quality, energy efficient, contemporary, office/life science campus which will provide open spaces and a pedestrianfriendly environment with extensive landscaping and sustainability elements incorporated.

2. The Project, including Design Review, is consistent with the General Plan and the Gateway Specific Plan because the proposed research and development buildings and campus are consistent with the policies and design direction provided in the South San Francisco General Plan for the Business Commercial land use designation by encouraging the development of high technology campuses in the East of 101 Area.

3. The Project, including Design Review, is consistent with the applicable design guidelines adopted by the City Council in that the proposed Project is consistent with the Gateway Specific Plan District Standards included in Chapter 20.220.

4. The Project is consistent with the Master Plan and Precise Plan, as proposed for modification, for the reasons stated in Section B above.

5. The Project is consistent with the applicable design review criteria in Section 20.480.006 (“Design Review Criteria”) because the project has been evaluated against, and found to be consistent with, each of the eight design review criteria included in the “Design Review Criteria” section of the Ordinance.

NOW, THEREFORE, BE IT FURTHER RESOLVED, that subject to the Conditions of Approval, attached as Exhibit A to this resolution, the Planning Commission of the City of South San Francisco hereby makes the findings contained in this Resolution, and approves the Precise Plan (attached as Exhibit B) and Design Review.

BE IT FURTHER RESOLVED that this Resolution shall become effective immediately upon its passage and adoption.
* * * * * * *
I hereby certify that the foregoing resolution was adopted by the Planning Commission of the City of South San Francisco at a regular meeting held on the 6th day of August, 2020 by the following vote:

AYES:Chair Wong, Vice-Chair Evans, Commissioner Faria, Commissioner Shihadeh, Commissioner Murphy, Commissioner Bernardo, Commissioner Tzang NOES:

ABSTENTIONS:

ABSENT:

RECUSE: Attest_/s/Sailesh Mehra__________
Secretary to the Planning Commission

CONDITIONS OF APPROVAL
P12-0061: PP20-0001 and DR20-0013
GATEWAY OF PACIFIC – PHASE 4 PRECISE PLAN
(Adopted by Planning Commission on August 6, 2020)
The Applicant/Project shall conform to all the conditions of approval identified in City Council Resolution 44-2013, as well as the additional conditions contained herein.

A. PLANNING DIVISION

1. The project shall be constructed and operated substantially as indicated on the plan set prepared by Flad Architects dated June 8, 2020, and approved by the Planning Commission in association with DR20-0013 as amended by the conditions of approval. The final plans shall be subject to the review and approval of the City’s Chief Planner.

2. Prior to the issuance of any building or construction permits for the project, the applicant shall revise the development plans to address the Design Review Board comments, subject to review and approval by the Chief Planner or designee.

3. The Applicant/Project shall comply with all applicable mitigation measures outlined in the adopted Mitigation Monitoring and Reporting Program for the 2020 Addendum / 2009 EIR for the Gateway of Pacific Phase 4 Revised Project.

4. The applicant shall comply with all terms and conditions specified in the Second Amendment to the Second Amended and Restated Development Agreement (DAA20- 0003).

5. The applicant is responsible for maintaining site security prior to, and throughout the construction process. This includes installation of appropriate fencing, lighting, remote monitors, or on-site security personnel as needed.

6. The applicant is responsible for providing site signage during construction, which contains contact information for questions regarding the construction.

7. During construction, the applicant shall provide parking for construction workers within a Gateway Business Park Master Plan parking structure when the Chief Building Official and Fire Marshal provide written approval.

8. Prior to issuance of certificate of occupancy, the applicant shall submit final landscaping and irrigation plans demonstrating compliance with the State’s Model Water Efficiency Landscaping Ordinance (MWELO), if applicable.
a. Projects with a new aggregate landscape of 501 – 2,499 sq. ft. may comply with the prescriptive measures contained in Appendix D of the MWELO. b. Projects with a new aggregate landscape of 2,500 sq. ft. or greater must comply with the performance measures required by the MWELO.
c. For all projects subject to the provisions of the MWELO, the applicant shall submit a Certificate of Completion to the City, upon completion of the installation of the landscaping and irrigation system.

9. The applicant shall contact the South San Francisco Scavenger Company to properly size any required trash enclosures and work with staff to locate and design the trash enclosure in accordance with the SSFMC Section 20.300.014, Trash and Refuse Collection Areas.

Applicant shall submit an approval letter from South San Francisco Scavenger to the Chief Planner prior to the issuance of building permits.

10. After the building permits are approved, but before beginning construction, the owner/applicant shall hold a preconstruction conference with City Planning, Building, and Engineering staff and other interested parties. The developer shall arrange for the attendance of the construction manager, contractor, and all relevant subcontractors.

11. A Parking and Traffic Control Plan for the construction of the project shall be submitted with the application for Building Permit, for review and approval by the Chief Planner and City Engineer.

12. The Entitled Project included an approved draft Preliminary TDM Plan. In accordance with South San Francisco Municipal Code Chapter 20.400, Transportation Demand Management, prior to issuance of a building permit the applicant shall submit a Final TDM Plan that incorporates revisions based on the Revised Project for review and approval by the Chief Planner.

B. ENGINEERING DIVISION
Permits

1. At the time of each permit submittal, the Applicant shall submit a deposit for each of the following permit reviews and processing:
a. Building Permit plan check and civil review. Provide cost of on-site improvements for deposit amount calculation.
b. Hauling/Grading plan check and permit processing. Provide Cubic Yards for deposit amount calculation.
c. Public Improvement plan check and permit processing. Provide cost of ROW improvements for deposit amount calculation.

2. A Grading Permit is required for grading over 50 cubic yards and if 50 cubic yards or more of soil is exported and/or imported. The Applicant shall pay all permit and inspection fees, as well as any deposits and/or bonds required to obtain said permits. The Grading Permit requires several documents to be submitted for the City’s review and approval. The Grading Permit Application, Checklist and Requirements may be found on the City website at http://www.ssf.net/departments/public-works/engineering-division.

3. A Hauling Permit shall be required for excavations and off-haul or on-haul, per Engineering requirements; should hauling of earth occur prior to grading. Otherwise, hauling conditions would be included with the grading permit. Hauling Permit may be found on the City website at: http://www.ssf.net/departments/public-works/engineeringdivision.

4. The Applicant shall obtain a Demolition Permit to demolish the existing concrete pad. The demolition permit shall be obtained from the Building Division and the Applicant shall pay all fees and deposits for the permit. The Applicant shall provide letters from all public utilities stating all said utilities have been properly disconnected from the existing buildings.

5. The Applicant shall submit a copy of their General Construction Activity Storm Water Permit Notice of Intent and Storm Water Pollution Prevention Plan (SWPPP), where required by State or Federal regulations, to the Engineering Division for our information.

These documents shall be submitted prior to receiving a grading or building permit for the subject project.

6. The City of South San Francisco is mandated by the State of California to divert sixty-five percent (65%) of all solid waste from landfills either by reusing or recycling. To help meet this goal, a city ordinance requires completion of a Waste Management Plan (“WMP”) for covered building projects identifying how at least sixty-five percent (65%) of non-inert project waste materials and one hundred percent (100%) of inert materials (“65/100”) will be diverted from the landfill through recycling and salvage. The Contractor shall submit a WMP application and fee prior to the issuance of a building or grading permit.

7. A Public Improvement Permit is required for any work proposed within the public rightof-way. The Applicant shall pay all permit, plan check, and inspection fees, as well as, any deposits and/or bonds required to obtain said permits. Applicant shall submit separate ROW improvement plans. An engineer’s cost estimate for only the scope of work within the ROW is required to determine the bond.

Plan Submittal

8. Along with the building permit and grading permit submittals, Applicant shall submit separate Right-of-Way (ROW) improvement plans for the Public Improvement Permit Application. An engineer’s cost estimate for the scope of work shown on the approved ROW improvement plans is required to determine the performance and payment bond amount. The submittal of the bonds is required prior to the execution of the Subdivision Improvement Agreement.

9. Improvement plans shall be printed to PDF and combined into a single electronic file, with each being stamped and digitally signed by a Professional Engineer registered in the State of California. Incorporated within the construction plans shall be applicable franchise utility installation plans, stamped and signed and prepared by the proper authority. Plans shall include the following sheets:

Cover, Separate Note Sheet, Existing Conditions, Demolition Plan, Grading Plan, Horizontal Plan, Striping and Signage Plan, Utility Plan(s), Details, Erosion Control Plan, and Landscape Plans, (grading, storm drain, erosion control, and landscape plans are for reference only and shall not be reviewed during this submittal).

10. Prior to building permit issuance, the Applicant shall obtain a grading permit with the Engineering Division and shall submit an application, all documentation, fees, deposits, bonds and all necessary paperwork needed for the grading permit. The Applicant shall submit a grading plan that clearly states the amount of cut and fill required to grade the project. The Grading Plans shall include the following plans:

Cover, Notes, Existing Conditions, Grading Plans, Storm Drain Plans, Stormwater Control Plan, and Erosion Control Plan.

11. Prior to building permit issuance, the Applicant shall obtain a Public Improvement Permit for all proposed work within the City ROW and shall submit an application, all documentation, fees, deposits, bonds and all necessary paperwork needed for the Public Improvement Permit. The Public Improvement Plans shall include only the scope of work within the City ROW (with reference to the on-site plans) consisting of the following plans:

Civil Plans, Landscape Plans, and Joint Trench Plans.

12. The Applicant shall submit a copy of their General Construction Activity Storm Water Permit Notice of Intent and Storm Water Pollution Prevention Plan (SWPPP), where required by State or Federal regulations, to the Engineering Division for our information.

These documents shall be submitted prior to receiving a grading or building permit for the subject project.

13. All improvements shall be designed by a registered civil engineer and approved by the Engineering Division.

14. The Engineering Division reserves the right to include additional conditions during review of the building permit, grading permit, or public improvement permit, as needed to ensure compliance with applicable laws and regulations, or other conditions of approval.

Mapping

15. Prior to Building Permit issuance, all applicable mapping shall be recorded with the San Mateo County Clerk Recorder’s Office.

16. Applicant shall submit all documents required for review of any mapping application.

17. Prior to the approval of any Permits, the Applicant shall enter into an Improvement Agreement and Encroachment and Maintenance Agreement with the City. These agreements shall be approved by City Council prior to execution. The Improvement Agreement shall require the Applicant to ensure the faithful performance of the design, construction, installation and inspection of all public improvements as reviewed and approved by the Engineering Division at no cost to the City and shall be secured by good and sufficient payment, performance, and one (1) year warranty bonds or cash deposit adequate to cover all of the costs, inspections and administrative expenses of completing such improvements in the event of a default. The value of the bonds or cash deposit shall include 110% of the cost of construction based on prevailing wage rates. The value of the warranty bond or cash deposit shall be equivalent to 10% of the value of the performance security. The Encroachment and Maintenance Agreement shall require the Applicant to maintain any street furniture that serves the property and all landscape within the project frontage at no cost to the City. The Encroachment and Maintenance Agreement shall be recorded with the San Mateo County Recorder and may be transferred to the property owner.

18. Applicant shall pay for all Engineering Division deposits and fees for any mapping application prior to review.

19. The applicant shall clearly show all existing easements on the improvement plans.

Right-of-Way

20. All new public improvements required to accommodate the development shall be installed at no cost to the City and shall be approved by the City Engineer and constructed to City Standards. All new public improvements shall be completed prior to Final Occupancy of the project or prior any Temporary Occupancy as approved by the City Engineer.

21. Prior to Building Permit issuance, the Applicant shall enter into an Improvement Agreement and Encroachment and Maintenance Agreement with the City. These agreements shall be approved by City Council prior to execution. The Subdivision Improvement Agreement shall require the Applicant to install all proposed public improvements as reviewed and approved by the Engineering Division at no cost to the City.

The Encroachment and Maintenance Agreement shall require the Applicant to maintain any street furniture that serves the property and all landscape within the project frontage at no cost to the City. The Encroachment and Maintenance Agreement shall be recorded with the San Mateo County Recorder and may be transferred to the property owner or Homeowner’s Association.

22. Prior to Building Permit issuance, the Applicant shall submit a video survey of the adjacent streets (perimeter of proposed property location) to determine the pre-construction condition of the streets at no cost to the City. The Applicant will be responsible to ensure that the condition of the streets and striping is in at least existing condition or better after construction is completed.

23. Applicant shall construct a new ADA accessible driveway entrance along the Oyster Point Boulevard entrance to the project site.

24. The Applicant shall rehabilitate the pavement on Oyster Point Boulevard from the eastern property line of GOP 1 to eastern most limits of the driveway access off of Oyster Point Boulevard for GOP 4. Pavement rehabilitation shall include the repair of any failed pavement areas as determined in the field by the City Inspector and a 2 inch grind and overlay of the street from the lip of gutter to lip of gutter and restriping the lane lines and crosswalks.

25. Applicant shall ensure that any pavement markings impacted during construction are restored and upgraded to meet City standards current to the time of Encroachment Permit approval.

26. Existing driveway approaches or portions of approaches along the property frontage that will not serve the new development or do not serve any other access shall be removed and replaced with new curb, gutter, and sidewalk. Where new work is required, monolithic curbs, gutter, curb ramps, commercial driveway approaches and 4’ wide (minimum) sidewalks are to be constructed to current City standards and to the satisfaction of the City Engineer.

27. Upon completion of construction and landscape work at the site, the Applicant shall clean, repair or reconstruct, at their expense, as required to conform to City Standards, all public improvements including driveways, curbs, gutters, sidewalks and street pavements along the street frontages of the proposed project along Gateway Blvd to the satisfaction of the City Engineer. Damage to adjacent property caused by the Applicant, or their contractors or subcontractors, shall be repaired to the satisfaction of the affected property owner and the City Engineer, at no cost to the City or to the property owner.

28. Applicant shall ensure the proposed trees and planting locations do not interfere with underground utilities or the joint trench. The Applicant will be required to install root barrier measures to prevent the sidewalk from uplift at no cost to the City.

29. Prior to public improvement permit issuance, the Applicant shall provide an engineer’s estimate for all work performed with in the public right-of-way and submit a bond equal to 110% of the estimate.

30. Prior to the issuance of the Encroachment Permit, the Applicant shall submit Traffic and Pedestrian Control Plans for proposed work on Oyster Point Boulevard and/or any area of work that will obstruct the existing pedestrian walkways.

31. For any work within the sidewalk and/or obstructing pedestrian routes shall provide pedestrian routing plans along with traffic control plans. Temporary lane or sidewalk closures shall be approved by the City Engineer and by the Construction Coordination Committee (if within the CCC influence area). For any work affecting the sidewalks or pedestrian routes greater than 2 days in duration, the adjacent parking lane or adjacent travel lane shall be closed and temporary vehicle barriers placed to provide a protected pedestrian corridor. Temporary ramps shall be constructed to connect the pedestrian route from the sidewalk to the street if no ramp or driveway is available to serve that purpose.

32. No foundation or retaining wall support shall extend into the City Right-of-Way without express approval from the Engineering Department. Applicant shall design any bioretention area or flow-through planters adjacent to the property line such that the facility and all foundations do not encroach within the City Right-of-Way or into an adjacent parcel.

Stormwater

33. The Applicant shall submit to the City Engineer a storm drainage and hydraulic study for the fully improved development analyzing existing conditions and post-development conditions. Initial time of concentration shall be 10 minutes. Precipitation shall be based on NOAA data for the site. The study shall be submitted to the City Engineer for review and approval.

34. The Applicant shall design and construct, any on-site and off-site storm drainage improvements along said storm drain system as recommended by the approved storm drainage and hydraulic study at no cost to the city.

35. The development shall not increase peak runoff based on a 25-year design storm. Initial time of concentration shall be 10 minutes. Precipitation shall be based on NOAA data for the site. The proposed storm drain system and runoff reduction information shall be included in the hydraulic study.

36. On-site storm drainage facilities shall be designed to accommodate runoff from a 10-year design storm. Initial time of concentration shall be 10 minutes. Precipitation shall be based on NOAA data for the site. On-site storm drain pipes shall be designed for open channel flow conditions and not be surcharged.

37. Drainage runoff shall not be allowed to flow across lot lines or across subdivision boundaries onto adjacent private property without an appropriate recorded easement being provided for this purpose.

38. The private storm drain lines collecting stormwater from the bioretention areas in the adjacent railroad spur property shall not be allowed without an appropriate recorded easement for this purpose

39. All building downspouts shall be connected to rigid pipe roof leaders which shall discharge into an approved drainage device or facility that meets the C3 stormwater treatment requirements of Municipal Regional Permit.

40. The on-site private storm drainage system shall not be dedicated to the City for ownership or maintenance. The private storm drainage system and any storm water pollutions control devices within the subdivision shall be owned, repaired, and maintained by the property owner or Homeowner’s Association.

Sanitary Sewer

41. The Applicant shall submit a sewer capacity study to determine how the project impacts and capacity of the sanitary sewer system and recommend any improvements necessary to accommodate the flows from the development project. The study shall include an analysis of the sanitary sewer main on Oyster Point Boulevard. Sanitary sewer mains shall not flow more than 2/3 full at peak wet weather flow. Please be sure to include all supporting calculations.

42. The Applicant shall design and construct, any on-site and off-site sanitary sewer improvements as recommended by the approved sewer capacity study at no cost to the city.

43. Applicant shall abandon all existing Sanitary Sewer Laterals serving the property to City Standards.

44. The Applicant shall install the new sewer laterals to City Standards including a cleanout in the sidewalk and a new wye connection or taptite connection at the main. Lateral sizes of 8-inch or larger require a manhole connection at the City sewer main.

45. The on-site sanitary sewer laterals shall not be dedicated to the City for maintenance. The sanitary sewer facilities within the subdivision shall be repaired and maintained by the property owner or Homeowner’s Association.

46. Each on-site sanitary sewer manhole and cleanout shall be accessible to maintenance personnel and equipment via pathway or driveways as appropriate. Each maintenance structure shall be surrounded by a level pad of sufficient size to provide a safe work area.

Utilities

47. All electrical and communication lines serving the property, shall be placed underground within the property being developed and to the nearest overhead facility or underground utility vault. Pull boxes, junction structures, vaults, valves, and similar devices shall not be installed within public pedestrian walkway areas.

48. The Applicant shall coordinate with the California Water Service for all water-related issues. All water mains and services shall be installed to the standards of the California Water Service.

49. The Applicant shall install fire hydrants at the locations specified by the Fire Marshal.

Installation shall be in accordance with City Standards as administered by the Fire Marshall.

On-site Improvements

50. The Applicant shall submit a construction access plan that clearly identifies all areas of proposed access during the proposed development.

51. Prior to receiving a Certificate of Occupancy form the Building Division, the Applicant shall require its Civil Engineer to inspect the finished grading surrounding the building and to certify that it conforms to the approved site plan and that there is positive drainage away from the exterior of the building. The Applicant shall make any modifications to the grading, drainage, or other improvements required by the project engineer to conform to intent of his plans.

52. All common areas are to be landscaped and irrigated and shall meet the requirements of the City’s Water Efficiency Landscape Ordinance (WELO). Submit landscape, drainage and grading plans for review and approval by the Engineering Division.

53. The Applicant shall submit a proposed workplan and intended methodologies to ensure any existing structures on or along the development’s property line are protected during proposed activities.

Grading

54. The Applicant shall provide documentation from a qualified environmental consultant of compliance with Mitigation Measures IV.G-2.2, IV.G-2.3, IV.G-3.4, IV.G-3.5, IV.G-4.2, and IV.G-4.3 as required by the Gateway Business Park Master Plan MMRP.

55. The recommendations contained within the geotechnical report shall be included in the Site Grading and Drainage Plan. The Site Grading and Drainage Plan shall be prepared by the Applicant’s civil engineer and approved by the project geotechnical engineer.

56. The entire project site shall be adequately sprinkled with water to prevent dust or sprayed with an effect dust palliative to prevent dust from being blown into the air and carried onto adjacent private and public property. Dust control shall be for seven days a week and 24 hours a day. Should any problems arise from dust, the Applicant shall hire an environmental inspector at his/her expense to ensure compliance with the grading permit.

57. Haul roads within the City of South San Francisco shall be cleaned daily, or more often, as required by the City Engineer, of all dirt and debris spilled or tracked onto City streets or private driveways.

58. The Applicant shall submit a winterization plan for all undeveloped areas within the site to control silt and stormwater runoff from entering adjacent public or private property. This plan shall be submitted to the City Engineer for review and approval prior to September 1 of each year. The approved plan shall be implemented prior to November 1 of each year.

59. Prior to placing any foundation concrete, the Applicant shall hire a licensed land surveyor or civil engineer authorized to practice land surveying to certify that the new foundation forms conform with all setbacks from confirmed property lines as shown on the Plans. A letter certifying the foundation forms shall be submitted to the Engineering Division for approval.

60. The applicant is required by ordinance to provide for public safety and the protection of public and private property in the vicinity of the land to be graded from the impacts of the proposed grading work.

61. All hauling and grading operations are restricted to between the hours of 8:00 a.m. to 6:00 p.m. for residential areas and 7:00 a.m. to 6:00 p.m. for industrial/commercial areas, Monday through Friday, excluding holidays, unless approved by the Chief Building Official.

62. Unless approved in writing by the City Engineer, no grading in excess of 200 cubic yards shall be accomplished between November 1 and May 1 of each year.

C. FIRE PREVENTION DIVISION

1. Install underground piping for water based fire protection systems per NFPA 24 and SSFFD requirements under separate fire plan check and permit.

2. Private fire service mains and appurtenances shall be installed in accordance with NFPA 24 as amended in Chapter 80.

3. Install a fire pump per NFPA 20 and SSFFD requirements under separate fire plan check and permit.

4. Fire department connections shall be installed in accordance with the NFPA standard applicable to the system design and shall comply with Sections 912.2 through 912.7.

5. Provide fire extinguishers in accordance with CFC Section 906.

6. Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility.

7. Exterior doors and openings required by this California Fire Code or the California Building Code shall be maintained readily accessible for emergency access by the fire department. An approved access walkway leading from fire apparatus access roads to exterior openings shall be provided when required by the fire code official.

8. All buildings four or more stories in height and all buildings classified as high-rise buildings by the California Building Code and Group I-2 occupancies having occupied floors located more than 75 feet (22,860mm) above the lowest level of fire department vehicle access, a fire command center for fire department operations shall be provided and shall comply with Sections 508.1.1 through 508.1.7.

9. The location and accessibility of the fire command center shall be approved by the fire code official. The fire command center shall be located adjacent to an approved fire apparatus access road and be accessible directly from the exterior of the building.

10. The fire command center shall be not less than 200 square feet (19 m2) in area with a minimum dimension of 10 feet (3048 mm).

11. Provide an independent study or proof that the Emergency Radio Responder coverage in the building is adequate or install an Emergency Responder Radio Coverage system in accordance with Section 510 of the California Fire Code under separate fire plan check and permit.

12. Emergency power systems and standby power systems required by this code or the California Building Code shall comply with Sections 604.1.1 through 604.1.8.

13. Provide fire flow in accordance with California Fire Code Appendix B.

14. Fire hydrants located on a public or private street, or onsite, shall have an unobstructed clearance of not less than 30 feet (15 feet either side of hydrant), in accordance with California vehicle code 22514. Marking shall be per California vehicle code 22500.1.

15. A hydrant is required to be located within 100 feet of the Fire Department Connection (FDC) and on the same side of the street.

16. A blue reflective dot shall be placed in the middle of the roadway directly in front of each fire hydrant.

17. All buildings shall provide premise identification in accordance with CFC Section 505.1 and South San Francisco Municipal Code Section 15.48.050(h), 15.48.060 (e) and

15.48.070(h).

18. Provide Knox key boxes for each building/area with access keys to entry doors, electrical/mechanical rooms, elevators, gates and others to be determined. L or H occupancies will generally require a Knox vault instead of box. Provide Knox Key Switch for any electronic gates.

19. Fire protection equipment shall be identified in an approved manner. Rooms containing controls for air-conditioning systems, sprinkler risers and valves, or other fire detection, suppression or control elements shall be identified for the use of the fire department.

Approved signs required to identify fire protection equipment and equipment location shall be constructed of durable materials, permanently installed and readily visible.

D. WATER QUALITY CONTROL DIVISION

1. Storm drains must be protected during construction. Discharge of any demolition/construction debris or water to the storm drain system is prohibited.

2. Do not use gravel bags for erosion control in the street or drive aisles. Drains in street must have inlet and throat protection of a material that is not susceptible to breakage from vehicular traffic.

3. No floatable bark shall be used in landscaping. Only fibrous mulch or pea gravel is allowed.

4. After 7/1/19, Demolition Projects must complete a PCBs Screening Assessment Form (attached and available in Building Division). If screening determines the building is an applicable structure, the Protocol for Evaluating PCBs-Containing Materials before Building Demolition shall be followed

5. As site falls in a Moderate Trash Generation area per South San Francisco’s Trash Generation Map (http://www.flowstobay.org/content/municipal-trash-generation-maps), determined by the Water Quality Control Division:
- Regional Water Quality Control Board-approved full trash capture devices must be installed to treat the stormwater drainage from the site. - At a minimum, a device must be installed before the onsite drainage enters the City’s public stormwater system (i.e. trash capture must take place no farther downstream than the last private stormwater drainage structure on the site). - An Operation & Maintenance Agreement will be required to be recorded with San Mateo County, ensuring the device(s) will be properly maintained. - A full trash capture system is any single device or series of devices that traps all particles retained by a 5 mm mesh screen and has a design treatment capacity of not less than the peak flow rate resulting from a one-year, one-hour storm in the subdrainage area or designed to carry at least the same flow as the storm drain connected to the inlet.

6. Roof leaders/gutters must NOT be plumbed directly to storm drains; they shall discharge to stormwater treatment devices or landscaping first.

7. Fire sprinkler test drainage must be plumbed to sanitary sewer and be clearly shown on plans.

8. Trash enclosure shall be covered, contained and the floor shall slope to a central drain that discharges to a grease trap/interceptor and is connected to the sanitary sewer. Details of trash enclosure shall be clearly provided on plans.

9. Install a condensate drain line connected to the sanitary sewer for rooftop equipment and clearly show on plans.

10. If laboratories will be installed, a segregated non-pressurized lab waste line must collect all laboratory waste. Install a sample port on the lab waste line outside the building, which will be accessible at all times.

11. Submit specs on the sample port.

12. If a food service kitchen/ prep area is to be installed, it shall connect to a gravity grease interceptor at least 750 gallons (liquid capacity) in size. Sizing of the grease removal device must be in accordance with the uniform plumbing code.

13. Grease interceptor shall be connected to all non-domestic wastewater sources in the kitchen (wash sinks, mop sinks, floor drains) and shown on plans.

14. A cut sheet of the Grease Interceptor/Trap must be shown on plans.

15. Garbage Disposals in Industrial/Commercial facilities are prohibited by City of South San Francisco Municipal Code. Remove Garbage Disposal(s) from plans.

16. Applicant will be required to pay a Sewer Capacity Fee (connection fee) based on SSF City Council-approved EDU calculation (involving anticipated flow, BOD and TSS calculations and including credits for previous site use). Based on the information received, the estimated Sewer Capacity Fee will be $361,327.42, payable with the Building Permit.

17. Elevator sump drainage (if applicable) shall be connected to an oil/water separator prior to connection to the sanitary sewer.

18. Drains in parking garage (if applicable) must be plumbed through an oil/water separator and then into the sanitary sewer system and clearly shown on plans.

19. Wherever feasible, install landscaping that minimizes irrigation runoff, promotes surface infiltration, minimizes use of pesticides and fertilizers and incorporates appropriate sustainable landscaping programs (such as Bay-Friendly Landscaping).

20. Site is subject to C.3 requirements of the Municipal Regional Stormwater Permit (please see SMCWPPP C.3 Technical Guidance Manual at
https://www.flowstobay.org/sites/default/files/C3TG5/SMCWPPP_C3TG%20V.5.0.pdf for guidance). The following items will be required;

21. Completed forms for Low Impact Development (C3-C6 Project Checklist). Forms must be on 8.5in X 11in paper and signed and wet stamped by a professional engineer. Calculations must be submitted with this package. Forms can be found at http://www.flowstobay.org/newdevelopment. A completed copy must also be emailed to andrew.wemmer @ssf.net.

22. Sign and have engineer wet stamp forms for Low Impact Development.

23. Submit flow calculations and related math for LID.

24. Complete Operation and Maintenance (O&M) agreements. Use attached forms for completing documents, as old forms are no longer sufficient. Do not sign agreement, as the city will need to review prior to signature. Prepare packet and submit including a preferred return address for owner signature. Packet should also be mailed or emailed to:

Andrew Wemmer
City of SSF WQCP
195 Belle Air Road
South San Francisco, CA 94080
[email protected]
Exhibit Templates can also be found within Chapter 6 the C.3 Technical Guidance at http://www.flowstobay.org/newdevelopment.

25. The onsite catch basins are to be stenciled with the approved San Mateo Countywide Stormwater Logo (No Dumping! Flows to Bay).

26. Landscaping shall meet the following conditions related to reduction of pesticide use on the project site:
a. Where feasible, landscaping shall be designed and operated to treat stormwater runoff by incorporating elements that collect, detain, and infiltrate runoff. In areas that provide detention of water, plants that are tolerant of saturated soil conditions and prolonged exposure to water shall be specified.
b. Plant materials selected shall be appropriate to site specific characteristics such as soil type, topography, climate, amount and timing of sunlight, prevailing winds, rainfall, air movement, patterns of land use, ecological consistency and plant interactions to ensure successful establishment.
c. Existing native trees, shrubs, and ground cover shall be retained and incorporated into the landscape plan to the maximum extent practicable.
d. Proper maintenance of landscaping, with minimal pesticide use, shall be the responsibility of the property owner.
e. Integrated pest management (IPM) principles and techniques shall be encouraged as part of the landscaping design to the maximum extent practicable. Examples of IPM principles and techniques include:
i. Select plants that are well adapted to soil conditions at the site. ii. Select plants that are well adapted to sun and shade conditions at the site. In making these selections, consider future conditions when plants reach maturity, as well as seasonal changes.
iii. Provide irrigation appropriate to the water requirements of the selected plants. iv. Select pest-resistant and disease-resistant plants. v. Plant a diversity of species to prevent a potential pest infestation from affecting the entire landscaping plan.
vi. Use “insectary” plants in the landscaping to attract and keep beneficial insects.

27. A SWPPP must be submitted (if > 1 acre). Drawings must note that erosion control shall be in effect all year long.

28. A copy of the state approved NOI must be submitted (if > 1 acre).

E. POLICE DEPARTMENT

1. The applicant shall install and maintain a system allowing first responders to enter into the building(s) by means of a code to be entered into a keypad or similar input device. A permanent code shall be issued to the Police Department. Physical keys or electronic access cards will not satisfy this requirement. Please note this is separate from the Fire Department’s “Knoxbox” requirement. This access must be provided at two entry points, each on a different sides of the building to allow first responders a tactical advantage when entering.

2. The hardware design of any doorways shall prevent any doors from being secured in a closed position to either another door or a fixed object within four feet of any door by means of a rope, cable, chain, or similar item. This is to prevent malicious prevention of egress and/or ingress by building occupants or first responders.

3. All exterior doorways shall be illuminated during darkness by a white light source that has full cut-off and is of pedestrian scale.

4. All interior common and service areas, such as the garage, bicycle storage area, fire escapes, etc, shall be illuminated at all times with a white light source that is controlled by a tamperproof switch or a switch located in an inaccessible location to passers-by.

5. The landing at the lowest level of service staircases, such as those in the garage area or fire escapes, shall have some mechanism, such as fencing, to prevent access and prevent people from loitering or concealing themselves in that area.

6. Any exterior bicycle racks installed shall be of an inverted “U” design, or other design that allows two different locking points on each bicycle.

7. Any publicly accessible benches shall be of a design that prevents persons from lying on them, such as a center railing.

8. Any publicly accessible power outlets shall be of a design that prevents their access or use during those hours the business is normally closed.

9. Any publicly accessible raised edge surfaces, such as retaining walls, concrete benches, handrails or railings, shall be of a design that prevents or discourages skateboard use on those surfaces.

10. The mature height of all shrubbery shall be no higher than three feet, if so, it shall be maintained at a maximum height of three feet, and tree canopies shall be no lower than six feet above grade.

11. The applicant shall install and maintain a camera surveillance system that conforms to the minimum technical specifications of South San Francisco Municipal Code Chapter

8.66.050 Minimum technological standards, (Ord. 1515, 2016). The video surveillance cameras will be used as a crime deterrent and assist with the identification and apprehension of criminals if a crime is committed on the property. Enough cameras shall be installed to provide adequate coverage for the intended space. Cameras shall be placed minimally in the following locations:
• All exterior entrances/exits
• Garage area (providing coverage to entire parking area) • Bicycle storage area
• Main lobby of building
• Lobby of sales/leasing office
• Loading docks

12. Any leasing of sales offices within the building shall be alarmed with a central station monitored silent intruder alarm system.

13. All parking lot lighting must conform to South San Francisco Municipal Code Chapter

15.48.080 Exterior security lighting.

14. The Police Department requires acknowledgement of these comments to include specific locations in the plans where the applicable change requests have been made. 3567874.1

← All documents from this meeting