Orange Memorial Park
Aquatic Center
City Council MeetingSeptember 28, 2022Concept Design Presentation 2 CURRENT ORANGE POOL
Challenges• Water Temperature
• Program Demand
• Too Small for Competitions• Crowded Locker Rooms
• COVID Closures
• Does Note Attract/Serve
Outdoor Swimmers
2017 FEASIBILITY STUDY
4 P
2021 SITE OPTION STUDY
• Construct a new 26,000 sf facility
• Two pools
• Cool‐water lap pool
• Warm‐water teaching/recreation pool
• Activity Room• Swimmer's Lounge• Maintain operation of existing pool throughout construction of the new pool facility
PROJECT SCOPE (PRESENTED IN 2021)
6 COMMUNITY ENGAGEMENT
PREFERRED CONCEPT – SITE PLAN REFINED
AUGUST 8, 2022
Orange Pool Today
Water Area = 3,150sf
6 Lanes
The New Orange Aquatic Center
Water Area = 11,825sf
17 lanes
10 Lanes
Heated
78 – 80 Degrees
7 Lanes
Heated
80 – 84 Degrees
6 Lanes
LEARN TO SWIM PROGRAM
PARTICIPANTS SERVED 1280
PARTICIPANT COUNT 656 MORE
INCREASE OVER EXISTING POOL% INCREASE OVER EXISTING POOL 105% PREFERRED CONCEPT – SITE PLAN REFINED
MODEL IN THE WIND TUNNEL
12’ – 0”
WIND SCREEN WITH SOLID BASE + POROUS TOP
(WITH MPR)
NEW AQUATIC CENTER
FERNEKESBUILDING
Community Workshop 1 April 9, 2022 Completed
Gallery Walk
Community Workshop #2 April 30, 2022 Completed
3 Initial Programming Alternatives and Concepts
Community Workshop #3 June 25, 2022 Completed
Preferred Programming and Concept Direction
South San Francisco Park and Recreation Commission August 16, 2022 Completed South San Francisco City Council Presentation ` September 28, 2022 Design Documents Complete Spring 2023 Construction Start Summer 2023 SPLASH Winter 2025
The New Orange Pool