Cities Index.
Exhibit B- Layout

South San Francisco City Council
November 9, 2022

Document
Exhibit B- Layout
Meeting
November 9, 2022
Body
South San Francisco City Council
Original file
1.1 MB
Text extracted from the city's file for reading and search. Open the original on ci-ssf-ca.legistar1.com. That file is the official record.

WORK ROOM
102B
AMH
102A

PARK RECEPTION
110A
RESERVES EQ-L18 102C
EQ-T06

AWFGGDNO

AWFGGDNO

AWFGGDNO
30x66
66-A5
30x66
66-A5 9'-0 1/2"
MB/B/F
SC TC30 42.5Hx30W BC 42TLB-TTC UC 42.5F-FTPTP48

42. P42
2 4
4 2

42.5Hx42W
TC42
D
D
MB/B/F
SC TC30 42.5Hx30W BC
LM1200
LM2100
Circuit 1
1x 120VAC 20A Dedicated Circuit (50-60 Hz)
1 Quad Receptacle
6x Ethernet Outlets
Wall Mounted Per Local Code
CGS Monitor
1 Duplex Receptacle (120VAC) &
1 Ethernet Outlet at Location
SortMate 2000
LibraryMate 1200
ErgoStaff 1200
Conveyor
Liftgate Conveyor
Sort Trolley
Option 1
1 x ES1200 Staff Return
1 x LM1200
1 x LM2100
12 x Sort Trolley Destinations
1 x Tote Shelf Destination
1 x Exception Bin (Sort Trolley)
7'-2 3/4"
"CRITICAL"
1'-10"
15'-3 1/2"
2'-11 1/2"
6'-10 1/4"
5'-4"
16'-1" A
LibraryMate 2100
2'-0 1/2" Tote Shelf

METAL BUILDING

SUPPORT
7'-2 3/4"
"CRITICAL"
2'-4 1/4"
2'-0"
2'-3 1/2"
3'-1"
1'-4 1/2" 1'-10"
LIBRARYMATE 1200

PENETRATION
LIBRARYMATE 2100

PENETRATION
VIEW "A"
1 THE LIBRARY MATE 1200/2100 IS SECURED TO THE WALL WITH A CLAMPING DEVICE. FOR

GYPSUM BOARD OR GLASS WALLS CONTRACTOR MUST PROVIDE FRAMING AROUND THE PENETRATION TO SUPPORT THE LM1200 UNIT AND USER LOADS FOR A TOTAL DOWNWARD FORCE OF 300 LBS. EXTEND THE FRAMING TO FLOOR OR EXISTING WALL STRUCTURE. THE

FRAMING MUST ALSO EXTEND THROUGH THE ENTIRE THICKNESS OF THE WALL TO SUPPORT CLAMPING FORCE OF APPROXIMATELY 500 LBS. DIMENSIONS REPRESENT THE CLEAR OPENING. PENETRATION DIMENSIONS ARE CRITICAL TO ENSURE SYSTEM ALIGNMENT. SEE LM1200 OR LM2100 CONTRACTOR DRAWING FOR MORE CLARIFICATION.

NOTE IT IS BEYOND THE SCOPE OF THIS DRAWING TO DETAIL UTILITIES THAT MAY BE PRESENT IN WALL. CONTRACTOR IS RESPONSIBLE FOR PLANNING ANY NECESSARY MODIFICATIONS.
1 1
04/13/2022 AJH 2 UPDATED PER CURRENT BUILDING LAYOUT; ADD VIEW A ARCH D
DATE REV. BY REV.# DESCRIPTION
REVISIONS elevating logistics B25836-000-1-4
4 -

PENINSULA LIBRARY SYSTEM

SOUTH SAN FRANCISCO
- B25836-000-1-4 1
HKI
10/27/2022
-NTG - - - -
- - - -
- - - -

PLAN VIEW
OPTION 1
-
-