Cities Index.
Attachment 1 - CIP Proposed Budget Book FY 23-24

South San Francisco City Council
June 16, 2023

Document
Attachment 1 - CIP Proposed Budget Book FY 23-24
Meeting
June 16, 2023
Body
South San Francisco City Council
Original file
2.8 MB
Text extracted from the city's file for reading and search. Open the original on ci-ssf-ca.legistar1.com. That file is the official record.

City of South San Francisco
Fiscal Year 2023-24 Proposed Budget
Proposed Version
Last updated 06/07/23
City of South San Francisco | FY2023-24 Budget Book Page 1

TABLE OF CONTENTS
Capital Improvement Program 3
Executive Summary 4
One year plan 6
Multi-year plan 12
Appendix 26
Capital Improvement Plan Requests 27
Glossary 544
City of South San Francisco | FY2023-24 Budget Book Page 2

CAPITAL IMPROVEMENT PROGRAM
City of South San Francisco | FY2023-24 Budget Book Page 3 Executive Summary
The Capital Improvement Plan (CIP) is the City of South San Francisco’s short and long-term plan for projects related to the community’s infrastructure categorized into the following six project types:

Public Facilities - projects to renovate, construct, and improve city buildings and infrastructure.

Parks - projects to replace and improve playgrounds, renovate baseball fields, and expand parks at city-owned public spaces.

Storm drains - projects to repair and improve storm drains and install green infrastructure to reduce pollution run-off into the San Francisco Bay.

Sanitary sewers - projects to maintain the Water Quality Control Plant (WQCP), Collection System Pumps Stations, and sanitary sewer lines within the City.

Streets - projects to repair bridges, resurface streets, and improve medians and sidewalks and study the feasibility of proposed roadway and rail extensions.

Traffic - projects to focus on arterials, corridors, and key intersections within the City, including adaptive traffic signals to provide better traffic flow, improve pedestrian safety, traffic calming, and better bicycle rider safety on city streets.

The CIP provides a link between the City’s General Plan, various master planning documents, and budget, and provides a means for planning, scheduling, and implementing capital improvement projects over the next five years.

In preparing this plan, the Public Works Department (PW) focused on projects that will improve the reliability and safety of the City’s infrastructure and that will meet the requirements of Clean Water Act mandates, including the National Pollutant Discharge Elimination System (NPDES) permits for storm water and wastewater management.

CIP Process
The CIP is the result of collaboration between various city departments and is created in a series of steps that engage various forecasting methods and use planning documents and infrastructure studies as a guide for new project needs.

City staff considers the following criteria when selecting projects for inclusion in the CIP:

Grant funded projects requiring a city contribution
Previously approved projects under construction or contract Projects required for regulatory compliance
Projects to maintain or upgrade existing City infrastructure Projects with no general fund allocations
Projects requested by the community or city departments Projects that can be reasonably delayed, are complete, or no longer necessary Departments submit their CIP project requests to Public Works (PW) using forms that capture various information, including project scope, justification, funding source(s), budget, status update (if an existing project), completion date, and ongoing operations/maintenance impacts. PW staff perform the initial evaluations of each project using the information submitted and availability of funds data provided by the finance department. PW then meets with the Finance Department and City Manager to review all projects and the proposed funding timeline. Following agreement on a CIP proposal for the subject budget year(s), it is presented by PW to the Budget Subcommittee. Subcommittee members consist of two City Council members. Typically, the subcommittee meets once in conjunction with the City’s operating budget presentation by the Finance Department. After the subcommittee’s recommendations are incorporated, a second updated CIP proposal is presented to the entire City Council at a study session along with the annual operating budget.

Prior to going to City Council for final approval, the CIP proposal is presented to the Planning Commission. The Planning Commission must review the CIP and find it consistent with the City’s General Plan.

The development of the CIP is not a project, as defined in the California Environmental Quality Act (CEQA). Therefore, an environmental review is not required for its adoption. However, individual projects listed herein may be subject to CEQA.

Environmental reviews will be conducted at the appropriate times during implementation of those projects.

City of South San Francisco | FY2023-24 Budget Book Page 4 Appropriations
The FY2023-24 CIP budget totals $ 40.3 million. There are 172 projects within the FY2023-24 five-year plan, 45 of which bear appropriations for FY2023-24. The following pages summarize funding proposals over the next five-year period - those with appropriations in the FY2023-24 budget year and those with general funding proposals (to be appropriated in future budget cycles) for future years (FY2024-25 to 2027-28). Details of each individual project are also included in Appendix A.

Funding Sources
The FY2023-24 CIP is funded by a wide range of different sources and funds used depending on the nature of the project. The City applies for external grant funding, wherever possible, from federal, state, and local agencies; uses bond financing if financially appropriate and feasible for large construction projects; employs revenues generated from various development impact fees; and transfers funding from other city funds (including the General Fund) and City reserves when needed and appropriate. Local tax measures also contribute to capital projects, including Measure A, Measure W (city and county), and Gas Tax. The pie chart and table in the following pages show the split of the FY2023-24 CIP by funding source and by project type.

On Going Maintenance and Operations Impact
The majority of the new and ongoing projects listed in this CIP result in improvement and/or replacement of existing facilities and equipment. In some cases, the operations and maintenance efforts and costs stay the same. Installation of some new equipment results in reduced energy costs due to higher efficiency. Reduced maintenance effort and costs are also realized where new equipment will not need replacement parts during the first several years of its use. New operations and maintenance costs are, however, required where projects result in the installation of new equipment and facilities where none previously existed.

City operations and maintenance staff continually review existing and upcoming requirements and make as-needed changes to their staffing and budgets in order to accommodate the needs of the City’s ever-changing infrastructure.

Conclusion
The FY 2023-24 CIP encompasses ongoing and new investments in the City’s infrastructure and operations, with an emphasis on cost efficiency, proactive management, and regulatory compliance. This document provides City Council and the public with a summary of the projects that Public Works will be managing during the next fiscal year and beyond for the continual betterment of all South San Francisco residents, businesses, and visitors.

City of South San Francisco | FY2023-24 Budget Book Page 5 Capital Improvement Program - 1-Year: FY2023-24
The list below shows the breakdown of the appropriations for the CIP budget by Funding Source.

Total Capital Requested
$40,349,600
45 Capital Improvement Projects
Total Funding Requested by Source
TOTAL $40,349,600.02
American Recovery Plan (-3%) $-1,040,400.0000
Citywide Traffic Impact Fee (15%) $6,300,000.00
Common Greens (1%) $500,000.00
East of 101 Sewer Impact Fee (0%) $145,000.00
General Fund (2%) $900,000.02
Infrastructure Reserves (5%) $2,050,000.00
Measure A (4%) $1,500,000.00
Parking District Fund (0%) $100,000.00
Road Maintenance Acct (SB1) (4%) $1,500,000.00
San Bruno / NBSU (14%) $5,599,360.00
Sewer Enterprise (49%) $20,295,640.00
SMC Measure W (1%) $500,000.00
Storm Water (5%) $2,000,000.00
City of South San Francisco | FY2023-24 Budget Book Page 6 CIP Appropriations by City Fund
The table below shows the CIP budget appropriations by City fund number.

CIP Appropriations by Project Type
The following table and pie chart show the FY2023-24 appropriations for capital improvement projects split by project type.

Sanitary Sewer capital projects account for the largest proportion of project funding ($26.04 million or 65% of total appropriations). $5.6 million of this expenditure amount will be reimbursed by the City's Wastewater partner, the city of San Bruno.

Capital Improvement Plan by Project Type
Sanitary Sewer $26,040,000 (64.54%)
Traffic $5,300,000 (13.14%)
Streets $4,650,000 (11.52%)
Parks $2,050,000 (5.08%)
Storm Drains $2,000,000 (4.96%)
Public Facilities $309,600 (0.77%)
City of South San Francisco | FY2023-24 Budget Book Page 7 Capital Improvement Plan Requests
Itemized Requests for 2024
pf2002 Oyster Point Marina Water-Taxi Ferry Terminal - Phase 1 (Spit) $0 Engineering and design work to upgrade Oyster Point peninsula, the adjacent guest dock and design a new water-taxi ferry terminal and passenger building. The improvements will eliminate flooding over the landfill and account for sea level rise.
pf2203 Terrabay Gymnasium HVAC Replacement $100,000
Replace the heating, ventilating, and air conditioning systems (HVAC) at the Terrabay Gymnasium and Recreation Center which has reached the end of its life and is no longer functioning. pf2305 Free Public Wifi Network -$140,400
To build a public Wifi network and pilot in the uptown/downtown area, providing 100MB download and 25MB upload speeds.
pf2401 City Facilities Door Access Controls $250,000
Implementation of an access control system to facilitate quick and convenient access for authorized personnel while restricting access to unauthorized individuals . This initiative was identified as part of the 2017 IT Strategic Plan. pf2402 Parking District Lot Rehabilitation $100,000
Paving, striping and maintenance of all city surface lots within the Parking District. pk2401 Replacement of Light Structures at Terrabay Recreation Center $500,000 Replace nine light poles that are needed for parking lot safety lighting and tennis court usage. pk2402 Dundee Park Remodel $600,000
Renovation of Dundee Park includes a new design, playground, and sports courts. pk2403 Brentwood Park Irrigation Infrastructure Upgrade $400,000 Irrigating the hillside in the back of the park to plant trees after mitigation and removal of hazardous trees. pk2404 Common Greens Rehabilitation Study & Implementation $500,000 Pre-design for study and implementation of common greens rehabilitation. pk2405 Clay Park Court Resurfacing $50,000
Resurfacing of the basketball court at Clay Park.
sd2401 Storm Damage Repairs $2,000,000
Repairs of damage caused by mudslides from recent storms of late December 2022-early January 2023. ss1502 Pump Station No. 4 Redundant Force Main $4,050,000 The PS4 is the only main conveyance line East of 101.
ss1801 Sewer Master Plan GP Update $90,000
Design and model update to the General Plan adopted in late 2022. Review of the model will either verify or update the CIP sizing recommendations from the Citywide Sewer Master Plan updated in early 2022. ss2001 Sanitary Sewer Rehabilitation $1,000,000
Ongoing maintenance required for sanitary sewer per the Sanitary Sewer Master Plan.

City of South San Francisco | FY2023-24 Budget Book Page 8 ss2301 WQCP Diffused Air Flotation Thickener Replacement $4,350,000 Upgrade the existing flotation thickeners to accommodate plant processes. ss2302 WQCP Sludge Dewatering Improvements $1,000,000
For the design and installation of sludge pretreatment conditioning system to increase biosolids total percent solids with the goal of decreasing hauling and disposal costs, as SB1383 now classifies biosolids as organic. ss2401 Oyster Point Sewer Main Upsize $100,000
Co-funding agreement with Kilroy to design and construct a sewer main upsize for the Oyster Point sewer main from Gull to Pump Station #2.
ss2402 Variable Frequency Drive Modernization Project - WQCP $1,000,000 Replacement of variable frequency drive components associated with Plant pumping systems originally installed in 1998. ss2403 Variable Frequency Drive Replacement Project - Sanitary Pump Stations $1,000,000 Replacement of variable frequency drive components associated with Plant pumping systems originally installed in 1998. ss2404 Programable Logic Controller Replacement Project - WQCP and Sanitary Pump Stations $2,050,000 Modernization of programable logic controllers at plant and pump stations to replace existing from 1999. ss2405 Headworks No. 1 Grit Chamber Tower Rehabilitation Project - WQCP $2,000,000 Evaluate, design and construct replacement grit tower structures installed in 1951. ss2406 Transformer K Replacement Project - WQCP $200,000 Engineer, design and install replacement Transformer K originally installed in 1991. ss2407 SB 1383 Organics Diversion Mandate Compliance and Cogeneration Expansion Project - WQCP $5,000,000 Evaluate, engineer, and design processing and storage equipment to comply with SB 1383 mandate and enhance renewable biogas production. This project will expand sustainable onsite power generation and heat recovery. ss2408 Biosolids Drying and Recycling Project - WQCP -Project 2 $1,000,000 Evaluate, design, and construct equipment associated with decreased moisture content of biosolids to comply with SB 1383 mandate. Renewable products such as biochar, soil amendments, and fly ash enhancers. ss2409 Industrial Coating Reapplication Project - WQCP and Pump Stations $2,000,000 Project to maintain applied industrial coatings to Plant and pump station metal assets. ss2410 WQCP Operations Control Center Rehabilitation Project - WQCP $200,000 Project to modernize operations control center to achieve the following goals - 1) better ergonomics, 2) replacement terminals for Plant SCAEDA supervisory control and data acquisition, 3) replacement of HVAC system. ss2411 NPDES Permit Compliance Upgrade (nutrient removal) $1,000,000 Participate in a regional study.
st1703 Bridge Preventative Maintenance Program $50,000
This project will conduct preventative maintenance on ten (10) city bridges including: Colma Creek Bridge at Produce Avenue, Canal Bridge at Linden Avenue, two bridges over San Bruno Channel over N. Access Road, Colma Creek Bridge at Spruce Ave.,...
st1804 Bridge Preventative Maintenance - Grand $100,000 This project will conduct preventative maintenance on Grand Avenue overpasses.

City of South San Francisco | FY2023-24 Budget Book Page 9 st2401 Complete Streets Improvements $1,000,000
Design & construct pedestrian and storm drain improvements at Elm Ct, Hillside Blvd, Park Way and Ponderosa Rd. st2402 2024 Street Surface Seal project $3,500,000
Design & construct street surface seal project as part of the Pavement Management Program (PMP) that will cycle through Zones 1 - 5, one zone each year providing a new surface seal of streets with new thermoplastic striping, legends and...
tr2301 Miscellaneous Traffic Improvements $300,000
Design & construct any traffic related improvements in the City, such as striping, signs, and other traffic calming measures from the Traffic Advisory Committee, Neighborhood meetings or as needed. tr2401 Airport Boulevard Bike/Ped Gap Closure Study $300,000 Support for feasibility studies as needed to complete bike/ped network, and support for grant applications. tr2402 El Camino Real Bik/Ped Improvements $300,000
Support for studies to implement Active South City recommendations on El Camino Real and connections to Centennail Trail.
tr2403 Traffic Signal Safety Improvements Project $500,000 Design & Construct new traffic signals at the intersection of Junipero Serra Blvd/Arroyo; Signal improvements/modifications at the intersections of Grand Ave/Spruce Ave, Grand Ave/Maple, Grand Ave/Linden Ave; and install retroreflective...
tr2404 Chestnut Ave & Commercial Ave Intersection Improvement Project $300,000 Design & construct new traffic signals at the intersections to improve pedestrian safety. The improvements include the removal of the “slip lane” and concrete island at the southeast corner that currently provides a free right turn... tr2405 Citywide School Traffic Calming Improvement Project $600,000 Design & construct traffic calming improvements at grades Kindergarten through 12 schools, including 15mph speed reduction.
tr2406 Traffic Studies and Grant Support $300,000
Support for any traffic-related studies from the Traffic Advisory Committee, Neighborhood meetings or as needed, and support for grant applications as needed.
tr2407 Bay Trail - Centennial Way Trail Gap Closure $100,000 A feasibility study to create a Class I trail connecting the Centennial Way Trail and Bay Trail. The project seeks to link the City’s two largest multi-use trails, enable a low-stress bikeway connection to the waterfront, and enhance... tr2408 Signalized Intersection Battery Back up Citywide $2,000,000 Upgrade signalized intersection Citywide with Battery Backup Systems. Approximately 50 intersections in the City are without BBS.
tr2409 Oyster Point Blvd - Corridor Study to support Bike/Ped and Complete Streets $100,000 Support for feasibility studies as needed to complete bike/ped network, transit, and support for grant applications. tr2410 Spruce Avenue - Corridor Study to support Bike/Ped and Complete Streets $100,000 Support for feasibility studies as needed to complete bike/ped network, transit, and support for grant applications. tr2411 Gateway Boulevard - Corridor Study to support Bike/Ped and Complete Streets $100,000 Support for feasibility studies as needed to complete bike/ped network, transit, and support for grant applications.

City of South San Francisco | FY2023-24 Budget Book Page 10 tr2412 Forbes Boulevard - Corridor Study to support Bike/Ped and Complete Streets $100,000 Support for feasibility studies as needed to complete bike/ped network, transit, and support for grant applications. tr2413 El Camino Real at 1st to Centennial Trail Gap Closure $200,000 Install bike and pedestrian signalized intersection at ECR @ 1st and connect the gap to Centennial Trail at 1st Street to set up for grant funding.

Total: $40,349,600
City of South San Francisco | FY2023-24 Budget Book Page 11 Capital Improvement Program - 5-Year: FY2023-24 to FY2027-28 Total Capital Requested
$120,299,601
172 Capital Improvement Projects
Total Funding Requested by Source
American Recovery Plan City Programs/Contributions
Citywide Traffic Impact Fee Common Greens
East of 101 Sewer Impact Fee General Fund
Grants Infrastructure Reserves
Measure A Other Funding Sources
Parking District Fund Road Maintenance Acct (SB1)
San Bruno / NBSU Sewer Enterprise
SMC Measure W Storm Water
2024
2025
2026
2027
2028
$40,349,600.02
$38,415,001.25
$22,935,000.00
$9,200,000.00
$9,400,000.00
$0 $12M $24M $36M
City of South San Francisco | FY2023-24 Budget Book Page 12 Capital Improvement Plan Requests
Itemized Requests for 2024-2028
pf1413 Grand Avenue Library Renovation Project $0
The project will install data communication infrastructure upgrades, both to and within the facility, and install new furniture, shelving and equipment to provide a more flexible, interactive, welcoming, contemporary space for our community.
pf1609 Magnolia & Siebecker Parking Lot Resurfacing $0
This project will resurface and restripe the Magnolia Senior Center Parking Lot. Treatment to be determined. pf1704 Training Tower Maintenance $0
Fire Training Tower 61 was built in 2006. In 2015, assessment of the tower revealed several high priority repairs that are needed in order to comply with National Fire Protection Association (NFPA) training structure standards. This project will... pf1705 City Hall Modernization $0
The upgrades are modest improvements that will enhance the security of the City Hall building for the employees and visitors. This project will implement priority one security upgrades of the recently completed security study. Upgrades will...
pf1707 Community Civic Campus $0
This project will design a new Community Civic Campus that includes a new library, parks & recreation facility, council chamber, a police operations & 911 dispatch center and a new fire station. Related to pf2103 and pf2207 projects. pf1801 Parking Garage #2 $0
This project will identiy locations, create a financing plan, purchase land if necessary, design and construct a new parking garage in downtown South San Francisco.
pf1805 Fire Station 64 Dorm & Bathroom Remodel $0
Remodel Fire Station 64 dormitory and bathrooms to include better storage, increase the number of beds in the dormitory, improve privacy, and allow for gender specific dormitory and bathrooms. pf1903 Electric Vehicle Charging Stations $0
To install electric vehicles (EV) charging station at various City locations for both internal fleet and public use. pf2001 Oyster Point Fuel Tank Removal $0
Remove fuel tanks from Oyster Point.
pf2002 Oyster Point Marina Water-Taxi Ferry Terminal - Phase 1 (Spit) $0 Engineering and design work to upgrade Oyster Point peninsula, the adjacent guest dock and design a new water-taxi ferry terminal and passenger building. The improvements will eliminate flooding over the landfill and account for sea level rise.
pf2003 Police Station - Phase I $0
This project will construct a new Police Operations & 911 Dispatch Center at the site of former Pet Club at the corner of Antoinette Lane and Chestnut Avenue. The current Police Station does not meet current building code requirements for... pf2101 Westborough Pre-K Design and Construction $0
The City would like to construct a new licensed preschool facility to serve this growing need in the community. Childcare Impact Fees would fund the design and construction of a new facility, which the Parks and Recreation Department would...

City of South San Francisco | FY2023-24 Budget Book Page 13 pf2102 Caltrain Plaza Public Art $0
As part of SSF Caltrain Station Improvement a new pedestrian tunnel and half acre plaza will be built at the intersection of Grand Ave and Airport Blvd. Seen as the cornerstone of a new transit hub in SSF, this plaza is imagined to anchor the... pf2103 Library, Parks & Recreation - Phase II $0
This project will design a new Community Civic Campus that includes a new library, parks & recreation facility, council chamber, a police operations & 911 dispatch center and a new fire station. The project also includes construction cost... pf2104 FF&E for Police/911 Dispatch Project $0
FF&E Purchases for new PD/911 Dispatch Center utilizing Police Seizure Asset Funds. pf2201 City Hall Fire Alarm / Electrical Modernization $0 Additional electrical circuit to support outdoor decorative lighting and EV chargers. pf2202 Solar Roof at City Corporation Yard $0
Solar roof at City Corporation Yard.
pf2203 Terrabay Gymnasium HVAC Replacement $100,000
Replace the heating, ventilating, and air conditioning systems (HVAC) at the Terrabay Gymnasium and Recreation Center which has reached the end of its life and is no longer functioning. pf2204 OP2C Landscape $0
Design and Installation of landscape improvements to areas of Oyster Point 2C utilizing funds dedicated to the City from the former Redevelopment Agency.
pf2205 OP2C Bay Trail $0
Design and Installation of Bay Trail improvements to areas of Oyster Point 2C utilizing funds dedicated to the City from the former Redevelopment Agency.
pf2206 OP2C Parking $0
Design and Installation of parking and roadways of Oyster Point 2C utilizing funds dedicated to the City from the former Redevelopment Agency.
pf2207 Bond Portion - Library, Parks & Recreation - Phase II $0 Refer to pf2103, this is bond portion only.
pf2208 PC/911 Public Safety Impact Fee Portion $0
This project will construct a new Police Operations & 911 Dispatch Center at the site of former Pet Club at the corner of Antoinette Lane and Chesnut Avenue.
pf2302 City Hall Annex Replacement and Landscape Improvement $0 Initial study to replace the City Hall Annex and update the City Hall block landscape. pf2303 Caltrain Signage $0
Design, fabrication and installation of signage for the Karyl Masumoto Plaza at the new South San Francisco Caltrain Station. Signage to be installed prior to opening of the plaza in early 2023. pf2305 Free Public Wifi Network -$140,400
To build a public Wifi network and pilot in the uptown/downtown area, providing 100MB download and 25MB upload speeds.

City of South San Francisco | FY2023-24 Budget Book Page 14 pf2306 Station 63 Replacement $23,000,000
Design and construction of a new fire station at 73 Camaritas Ave., a parcel owned by the City. The current station is undersized and located in the basement of a building that is in the process of being vacated. The new station... pf2307 Corp Yard Office HVAC including proposed Traffic Control Center $0 The Corp Yard is shared by Public Works & Parks & Recreation. As needs of both departments change and staffing increases, the Heating, Ventilation and Air Conditioning (HVAC) system needs to be modified to support space utilization... pf2401 City Facilities Door Access Controls $500,000
Implementation of an access control system to facilitate quick and convenient access for authorized personnel while restricting access to unauthorized individuals . This initiative was identified as part of the 2017 IT Strategic Plan. pf2402 Parking District Lot Rehabilitation $100,000
Paving, striping and maintenance of all city surface lots within the Parking District. pk1402 Orange Memorial Park Sports Field Renovation $0
Resulting from many years of overuse, the ballfields are due for renovation. The grandstand bleachers are in a constant state of disrepair and should be replaced with lower maintenance bleachers. This project will be divided into two phases:

Phase...
pk1701 Gateway Monument Signs $0
This project will design all gateway monument signs.
pk1802 Urban Forest Master Plan $0
Would provide a handbook for prioritizing and implementing many specific tree risk items in numerous sites called out in Parks Deferred Maintenance Plan (PDMP).
pk1803 Sellick Park Renovation Project $0
Replacement of play equipment and surfacing, tree thinning and removals, pathway, building and picnic area renovation. pk1804 Buri Buri Field & Court Improvements $0
This project will resurface the basketball court, renovate the baseball field and address amenitities including bleachers, scoreboard, and paving for ADA accesibility.
pk1805 Avalon Park Improvements $0
This project will address immediate tree concerns, provide ballfield improvements, and safety resurfacing. pk1806 Gardiner Park Playground Replacement $0
This project rehabilitates Gardiner Park to improve the use of space, landscaping, and play equipment in order to better serve the community.
pk1807 Hillside School Soccer Field Renovation $0
This project will provide rehabilitation to deferred maintenance conditions at SSFUSD owned, SSF maintained Hillside School site.
pk1902 Oyster Point Development Conduits $0
This project will construct a joint trench dark fiber conduit and Bay Trail conduit for future closed-circuit television. pk2102 Sign Hill Fire Mitigation and Park Restoration $0 Sign Hill Fire Mitigation and Park Restoration.

City of South San Francisco | FY2023-24 Budget Book Page 15 pk2103 Centennial Trail Master Plan $0
The City will take over maintenance and development rights to the BART right-of-way (BART ROW) running through South San Francisco at some time in 2020 or 2021. The BART ROW will require proactive and creative programming and the City would like...
pk2104 Orange Memorial Park Master Plan Update $0
Project will update master plans for Orange Memorial Park, including site programming, spatial layout options and conceptual designs for existing parkland and potential expansion into Mazzanti Property. pk2201 Aquatics Center $0
Design and construction of new aquatics center in Orange Memorial Park. pk2202 Westborough Park Pathways $0
This project would improve some existing pathways at Westborough Park by construction of ADA compliant pathways. Westborough Park renovation completed in 2012. At that time, non-ADA compliant upper pathways in poor condition west of the park...
pk2303 Replacement of Light Structures at Hillside Ballfield $0 Project will replace aging light fixtures at the Hillside Ballfields. pk2304 Reclaimed Water Pipe Design & Connection $0
Design and installation of reclaimed water connections and associated booster pumps to connect the cistern at Orange Memorial Park to the other side of Orange Ave as well as across Chestnut Avenue to the Civic Campus properties including the...
pk2309 Bond Portion of OMP Sports Field Renovation (fund 522) $0 Bond portion of funding for Orange Park Sports Field Renovation (pk1402). pk2310 Bond portion of Aquatics Center (fund 524) $0
Bond portion of funding for Aquatics Center (pk2201).
pk2401 Replacement of Light Structures at Terrabay Recreation Center $500,000 Replace nine light poles that are needed for parking lot safety lighting and tennis court usage. pk2402 Dundee Park Remodel $600,000
Renovation of Dundee Park includes a new design, playground, and sports courts. pk2403 Brentwood Park Irrigation Infrastructure Upgrade $500,000 Irrigating the hillside in the back of the park to plant trees after mitigation and removal of hazardous trees. pk2404 Common Greens Rehabilitation Study & Implementation $500,000 Pre-design for study and implementation of common greens rehabilitation. pk2405 Clay Park Court Resurfacing $50,000
Resurfacing of the basketball court at Clay Park.
sd1401 Storm Water Trash Capture Devices $0
This project will plan for the sizing and placement of trash capture devices to improve storm water quality. Funding in subsequent years will be for construction of capture devices. sd1603 Green Infrastructure Planning Study $0
NPDES provision C.3.j requires all permittees to develop a Green Infrastructure framework for governing body approval by June 2016. This project will result in a report that prioritizes and maps project locations in the City where existing...

City of South San Francisco | FY2023-24 Budget Book Page 16 sd1801 Orange Memorial Park Stormwater Capture Project $0 Phase III - Design: Based on engagement with community and civic leaders, preliminary designs will be developed for review and comment by City departments and key stakeholders. sd2001 Hickey/Camaritas Slide Repairs $0
Stabilization of the hillside located at Hickey Boulevard and Camaritas. sd2002 South Linden Storm Drain Repairs $0
Storm drain repairs along South Linden Avenue.
sd2201 Francisco Terrace Flood Protection Levy $0
Flood protection improvements in the vicinity of Terrace Drive. A floodwall is proposed to extend along the property line from Terrace Dr to the elevated bike/pedestrian trail which parallels the BART alignment. A recent hydrological study has... sd2301 Storm Drain Master Plan $0
Hydraulic model of Storm Drain collection and conveyance system. Additionally this project will conduct a condition assessment and map all strom drains and will determine deficiencies within the city’s storm drain system and... sd2302 Electrification of Storm Pump Stations $0
Design and construction for electrification of diesel storm pump stations at San Mateo Avenue & South Airport Boulevard.

Time and infrastructure changes have shown that these temporary stations should be converted to electric to eliminate fuel...
sd2303 South Maple Storm Pump Station Renovation $0
Refurbishment of existing pump station infrastructure components in and around South Maple pump station sd2304 Hickey Boulevard Hillside Stabilization $0
The project will identify and plan the geotechnical stabilization of the Hickey Blvd hillside to prevent slides during heavy rain events.
sd2401 Storm Damage Repairs $2,000,000
Repairs of damage caused by mudslides from recent storms of late December 2022-early January 2023. ss1205 WQCP Solar PV $900,000
Construction of a solar photovoltaic carport system at the WQCP. Reached the end of the upgrade. Design to solar project 190 kw PV system for covered employee parking. This project will provide approximately 180 kW of photovoltaic power... ss1301 WQCP Wet Weather and Digester Improvements $0
This project will design and construct new digesters #1 and #2 and retrofit #3 at the WQCP. The WQCP Minimize Blending Projects and Plant Wide Painting Program are incorporated in this project. ss1307 Plant-Wide Industrial Re-Coating Program $0
This project will result in new paint and protective coatings on buildings and pipes at the Water Quality Control Plant (WQCP).
ss1502 Pump Station No. 4 Redundant Force Main $8,100,000 The PS4 is the only main conveyance line East of 101.
ss1601 Sodium Hypochlorite Tank Replacement $0
Replace existing storage tanks which are at end of design life. Study appurtenant piping to determine best overall upgrades.

City of South San Francisco | FY2023-24 Budget Book Page 17 ss1702 Pump Station No. 2 Upgrade $0
Upgrade Pump Station No.2 to accommodate increased flows from the Cove area. ss1703 WQCP Secondary Clarifiers #1 and #2 Rehab $0
Rehabilitate WQCP Secondary Clarifiers #1 and #2.
ss1704 WQCP Effluent Storage Basin Liner Replacement $0 The Water Quality Control Plant effluent storage basin was constructed in 2005. Periodic inspections have revealed moderate to sever ultraviolet light (UV) damage to the lining membrane. This project will design and replace effluent storage basin...
ss1705 WQCP Switchgear & Cogen Controls Upgrade $0
Design and replace the switchgear and cogen controls at the WQCP. Programmed in CIP for construction in FY 19/20. ss1801 Sewer Master Plan GP Update $90,000
Design and model update to the General Plan adopted in late 2022. Review of the model will either verify or update the CIP sizing recommendations from the Citywide Sewer Master Plan updated in early 2022. ss1802 WQCP Sea Level Rise Study and Plan $0
USACE led project, protection of WQCP from flood and sea level rise. ss1901 Pump Station Industrial Re-Coating Program $0
This project will result in new paint and protective coatings on buildings and pipes at the Water Quality Control Plant (WQCP).
ss1902 Pump Station #14 Capacity Upgrade (as needed) $0 This project will design the necessary upgrades to the pump station in order to accommodate the new growth in "The Cove" area. Construction to occur in the next fiscal year. ss2001 Sanitary Sewer Rehabilitation $4,000,000
Ongoing maintenance required for sanitary sewer per the Sanitary Sewer Master Plan. ss2201 Country Club Park Sewer Master Plan $0
District-level study for sewer service expansion into the unincorporated Country Club Park neighborhood addressing collection and conveyance system and tie-ins to the City system. For use when considering neighborhood annexation or Outside Service...
ss2202 Oyster Point Pump Station $0
Oyster Point Pump Station
ss2301 WQCP Diffused Air Flotation Thickener Replacement $8,700,000 Upgrade the existing flotation thickeners to accommodate plant processes. ss2302 WQCP Sludge Dewatering Improvements $1,000,000
For the design and installation of sludge pretreatment conditioning system to increase biosolids total percent solids with the goal of decreasing hauling and disposal costs, as SB1383 now classifies biosolids as organic. ss2401 Oyster Point Sewer Main Upsize $4,100,000
Co-funding agreement with Kilroy to design and construct a sewer main upsize for the Oyster Point sewer main from Gull to Pump Station #2.
ss2402 Variable Frequency Drive Modernization Project - WQCP $2,050,000 Replacement of variable frequency drive components associated with Plant pumping systems originally installed in 1998.

City of South San Francisco | FY2023-24 Budget Book Page 18 ss2403 Variable Frequency Drive Replacement Project - Sanitary Pump Stations $1,980,000 Replacement of variable frequency drive components associated with Plant pumping systems originally installed in 1998. ss2404 Programable Logic Controller Replacement Project - WQCP and Sanitary Pump Stations $2,050,000 Modernization of programable logic controllers at plant and pump stations to replace existing from 1999. ss2405 Headworks No. 1 Grit Chamber Tower Rehabilitation Project - WQCP $5,000,000 Evaluate, design and construct replacement grit tower structures installed in 1951. ss2406 Transformer K Replacement Project - WQCP $200,000 Engineer, design and install replacement Transformer K originally installed in 1991. ss2407 SB 1383 Organics Diversion Mandate Compliance and Cogeneration Expansion Project - WQCP $14,900,000 Evaluate, engineer, and design processing and storage equipment to comply with SB 1383 mandate and enhance renewable biogas production. This project will expand sustainable onsite power generation and heat recovery. ss2408 Biosolids Drying and Recycling Project - WQCP -Project 2 $10,000,000 Evaluate, design, and construct equipment associated with decreased moisture content of biosolids to comply with SB 1383 mandate. Renewable products such as biochar, soil amendments, and fly ash enhancers. ss2409 Industrial Coating Reapplication Project - WQCP and Pump Stations $5,000,000 Project to maintain applied industrial coatings to Plant and pump station metal assets. ss2410 WQCP Operations Control Center Rehabilitation Project - WQCP $1,000,000 Project to modernize operations control center to achieve the following goals - 1) better ergonomics, 2) replacement terminals for Plant SCAEDA supervisory control and data acquisition, 3) replacement of HVAC system. ss2411 NPDES Permit Compliance Upgrade (nutrient removal) $1,000,000 Participate in a regional study.
st1004 South Linden Avenue Grade Separation $0
Preliminary study on grade separation at railroad crossing on South Linden Avenue. st1204 Underground Utility District-Rule 20A Spruce Avenue $0 Underground overhead on utilities on Spruce Ave in accordance with CPUC Rule 20A program. Evaluate feasibility of establishing additional Underground Districts.
st1301 South Airport Boulevard Bridge Replacement $0
The project will replace the South Airport Boulevard Bridge at North Access Road. st1403 SSF Grand Boulevard Improvements Project (Chestnut to Arroyo) - Phase I $0 Improvents along El Camino Real between Chestnut Avenue and Arroyo Drive by installing enhanced pedestrian crossings with corner curb bulbouts and median refuges, expanding bus stop/waiting areas, and new landscaping in the medians. st1502 SSF Grand Boulevard Improvements Project (Kaiser to BART) - Phase II $0 Improve El Camino Real between Kaiser Way and McLellan Drive by installing enhanced pedestrian crossings with corner curb bulbouts and median refuges, expanding bus stop/waiting areas, and a newly landscaped median. st1601 Linden Ave Phase 1 Traffic Calming Improvements $0 TDA The City has been reimbursed 100% on eligible expenditures for TDA grant. Construction work completed. Closeout of project in progress.

City of South San Francisco | FY2023-24 Budget Book Page 19 st1602 Linden Ave Phase 2 & Spruce Ave Traffic Calming Improvements $0 ATP The Project is in construction. Requesting additional contract authority (increase of $100K to contingency). st1603 Caltrain Station Enhancements $0
The Project supports the Caltrain Station Relocation with construction of a new plaza at Grand/Airport and a new shuttle drop-off on Poletti. Construction led by JPB.
st1605 Spruce Avenue Pedestrian Improvements (Lux to Miller) $0 Along Spruce Avenue, from Lux Ave. to Miller Ave., this project will install edge line striping, traffic calming medians, high visibility xwalk, staggered landscaped bulbouts, and crosswalk striping st1702 UUD Rule 20A Antoinette Lane $0
This project will establish an Underground Utilities District (UUD) on Antoinette Lane from Peninsula Pine Apartments to terminus. Project extends approximately 1,200 linear feet and will cost approximately $1.3 million. Antoinette Lane adjoins... st1703 Bridge Preventative Maintenance Program $520,000 This project will conduct preventative maintenance on ten (10) city bridges including: Colma Creek Bridge at Produce Avenue, Canal Bridge at Linden Avenue, two bridges over San Bruno Channel over N. Access Road, Colma Creek Bridge at Spruce Ave.,...
st1801 Grand Avenue Streetscape $0
Redesign Grand Avenue to accommodate wider sidewalks and an improved streetscape to support Caltrain Station access and support the retail environment of the Downtown area. Project will design improvements to Airport Boulevard and Grand Avenues...
st1804 Bridge Preventative Maintenance - Grand $100,000 This project will conduct preventative maintenance on Grand Avenue overpasses. st1805 El Camino Real Gateway Signs & Medians (Noor Ave to Spruce Ave) $0 This project will replace the landscaped median including irrigational systems and vegetation and install a new gateway sign on El Camino Real between Noor and Spruce Avenue. The project will replicate or complement the Grand Boulevard design...
st1806 North Access Road Bike and Pedestrian Improvements $0 This project will widen approximately 1,000 feet of bike and pedestrian pathways on North Access Road beginning at South Airport Boulevard.
st1807 Grand Boulevard Project (Arroyo Drive to Kaiser Way) Phase III $0 This Project will improve El Camino Real between arroyo Drive and Kaiser Way by installing enhanced pedestrian crossings, with corner curb extensions and median refuges, expanded bus stop/waiting areas, and a new landscaped median.
st1902 3rd Street Rail Extension Feasibility $0
To extend the 3rd Street light rail from San Francisco to South San Francisco. st1903 Street Rehabilitation Program FY 2018-19 $0
Street Rehabilitation project for Fiscal Year 2018-19. Project st1705 will be closed and excess funds moved to this project.

This project will rehabilitate various City streets in accordance with the City’s pavement management... st1904 Underground Utilities District (UUD) Rule 20A for Mission Road $0 Establish an Underground Utility District on Mission Road from Grand Avenue to connect with underground utilities at the South San Francisco BART south entrance. Additional funding is required to replace city-owned street lighting.

City of South San Francisco | FY2023-24 Budget Book Page 20 st1905 Railroad Avenue Extension $0
This Measure A grant proposes to fund the preliminary Planning Phase and Project initiation document phase to extend Railroad Avenue easterly from South Linden Avenue/Allerton Avenue. This project provides a new east-west connection for motorists,...
st2003 Station to East Grand Bike Gap Closure $0
Install bikeway/bike lanes to connect the bike route from Caltrain Station to East Grand Avenue (at Grand/E.Grand). Install shared-use path, new crosswalks, and remove slip lane.
st2004 South Airport Belle Air Public Access Improvement $0 Per BCDC Permit, Construction for bike and pedestrian improvements leading to SF Bay Trail. st2101 ECR Medians Improvement Project $0
Construct replacement of landscape median including irrigational systems and vegetation on El Camino Real between Chestnut Ave and Spruce Ave. The project will replicate or complement the Grand Blvd design concepts. st2102 Broadband Expansion Project $0
The City adopted the "dig once" policy which requires public and private excavators to coordinate with the City on the installation of extra fiber or conduit whenever ground will be broken in the public right-of-way. This project will... st2103 Pavement Management Plan - 2020 Surface Seal $0
This project will rehabilitate various City streets in accordance with the City’s pavement management program. st2104 Pavement Management Plan - 2020 Pavement Rehabilitation $0 This project will rehabilitate various City streets in accordance with the City’s pavement management program. st2105 Pavement Management Plan - 2021 Surface Seal $0
This project will rehabilitate various City streets in accordance with the City’s pavement management program. st2106 Pavement Management Plan - 2021 Pavement Rehabilitation $0 This project will rehabilitate various City streets in accordance with the City’s pavement management program. st2107 2022 West of 101 Pavement Rehabilitation $0
This project will rehabilitate various City streets in accordance with the City’s pavement management program. st2201 Junipero Serra Boulevard Soundwall Feasibility Study $0 Feasibility study for soundwall on Junipero Serra Boulevard. st2202 Bond Portion - 2020 Pavement Rehabilitation $0
Bond-funded portion. This project will rehabilitate various city streets in accordance with the City’s pavement management program.
st2203 Bond Portion - 2021 Pavement Rehabilitation $0
Bond-funded portion. This project will rehabilitate various city streets in accordance with the City’s pavement management program.
st2204 Bond Portion - 2022 West of 101 Rehabilitation $0 2022 West of 101 Pavement Rehabilitation. (Local Funds = Bond Measure Funds) st2301 Junipero Serra Boulevard/Westborough Boulevard Corridor Feasibility Project $0 The City applied for SMCTA Bike / Ped Cycle 6 grant funding to fund the planning of the Junipero Serra Blvd and Westborough Blvd Bike and Ped improvements as identified in the Active South City Plan. The City was awarded funding for the first year...

City of South San Francisco | FY2023-24 Budget Book Page 21 st2302 2023 Surface Seal Project (Zone 4) $0
Surface Seal Zone 4 (Downtown/Old Downtown).
st2303 Bridge Asset Management Program $0
Bridge Asset Management Program to proactively identify and fund city bridges. st2305 OBAG3 School St / Spruce Ave and Hillside Blvd Safety and Access Improvement Project $0 The Project would provide street and sidewalk improvements on School Street/Spruce Avenue and on Hillside Boulevard as part of a community-developed and supported Safe Routes to Schools program. Improvements will enhance the safety of students...
st2401 Complete Streets Improvements $1,000,000
Design & construct pedestrian and storm drain improvements at Elm Ct, Hillside Blvd, Park Way and Ponderosa Rd. st2402 2024 Street Surface Seal project $14,000,000
Design & construct street surface seal project as part of the Pavement Management Program (PMP) that will cycle through Zones 1 - 5, one zone each year providing a new surface seal of streets with new thermoplastic striping, legends and...
tr1010 South Airport Boulevard/Utah Avenue $0
South Airport Boulevard/Utah Avenue.
tr1103 Grand/East Grand (TIF #26) $0
Grand/East Grand (TIF #26).
tr1402 West Orange/Centennial Way Pedestrian Beacon $0
This project will construct flashing beacons on West Orange Avenue at Centennial Way. tr1404 US-101 Produce Avenue Interchange (TIF #39) $0
US-101 Produce Avenue Interchange (TIF #39).
tr1501 Junipero Serra Boulevard/King Drive Intersection Improvements $0 This project will install signal mast arms and a speed feedback sign, realign medians, and update island and curb ramps at the Junipero Serra and King Drive intersection.
tr1602 Oyster Point & East Grand Avenue Corridor Improvements $0 The project will design improvements at the East Grand Avenue/Gateway Avenue and East Grand Avenue/Forbes Boulevard intersections.
tr1701 Sunshine Gardens Traffic Safety Improvements $0
This project will install traffic safety measures for pedestrians and bicyclist including the installation of advanced stop bars, high visibility ladder crosswalks, median pedestrian refuge islands, advanced yield lines, edge lines, and new ADA... tr1702 East of 101 Traffic Model Update $0
This project is to update the existing collection of data East of 101 Traffic Model to create new baseline. tr1705 Update Pedestrian and Bicycle Master Plan $0
This project will update the Pedestrian and Bicycle Master Plans. tr1801 Spruce and Commercial Signalized Intersection $0 HSIP Construction on-hold pending delivery of TS Mast Arm and PG&E new electrical service.

City of South San Francisco | FY2023-24 Budget Book Page 22 tr1901 Adaptive Traffic Control System $0
Implement an adaptive traffic control system citywide. Phase 1 will coordinate East of 101 traffic signals to and from the freeway.
tr1902 East of 101 Traffic Signal IDEA Grant $0
The core goals of the IDEA program are to improve travel time and travel time reliability along arterials for autos and transit vehicles, improve safety for all users, decrease emissions and fuel consumption, and improve knowledge of and... tr1903 North Connectivity Bicycle Lanes $0
Construct 2.7 miles of Class II and III bike lanes on Hillside Blvd, Oyster Point, Gull Drive, and East Grand. tr1904 Miscellaneous Traffic Improvements $0
Misc. Studies, TAC Reviews and implementation costs to meet Council/CM and public request. tr1905 Littlefield Avenue Extension Feasibility Study $0 This project will study the feasibility to add new connections to Interstate 380 (I-380) via Littlefield Avenue and North Access Road. A new connection to I-380 provides additional access to Highway 101 and Interstate 280 to the west. The existing...
tr1906 Hillside & Lincoln $0
Design and install a traffic signal and associated pedestrian improvements and Hillside and Lincoln. tr1907 South Connectivity Bicycle Lanes $0
Construct 0.72 miles of class III and 0.78 miles of class II bike lanes on S. Airport and Harbor Way. tr2001 West Orange and Hillside Pedestrian Crossing Improvements $0 Install flashing beacons and high visibility crosswalks on West Orange and Hillside. tr2002 Smart Corridor $0
Implementation of Intelligent Transportation System (ITS) along segment of 101 corridor north of I-380. tr2102 E.Grand/DNA/Allerton Project $0
DNA Way & Allerton Ave at E.Grand signal.
tr2103 Local Road Safety Program (LRSP) $0
For operational improvements as shown in the Traffic Impact fee Study Update East of 101 Area tr2104 East of 101 Bicycle Safety Improvements $0
The Project is funded through C/CAG TFCA funding and proposes to improve safety and traffic flow by providing detection upgrades which would include a bicycle detection system along E Grand Ave. and Forbes Blvd. tr2201 Grand Avenue Off-Ramp Realignment (Caltrain East Access) $0 Preliminary Study Report to evaluate the feasibility of re-aligning the Grand Avenue Off-Ramp. tr2202 HSIP Curb Ramps $0
Curb Ramps in Zone 4 - In Advance of the 2022 Pavement Rehab Project. tr2203 E 101 Transit Shelter and Bulbout Grant from MTC $0 The project would provide new bus stops in South San Francisco’s biotechnology hub to enable more efficient shuttle operations and expanded SamTrans service in the area. This project would add 11 new on-street bus/shuttle stops,...

City of South San Francisco | FY2023-24 Budget Book Page 23 tr2301 Miscellaneous Traffic Improvements $1,100,000
Design & construct any traffic related improvements in the City, such as striping, signs, and other traffic calming measures from the Traffic Advisory Committee, Neighborhood meetings or as needed. tr2302 Right of Way Infrastructure Assessment and Upgrades $0 This project will complete the previously paused infrastructure inventory and assessment, and upgrade all the traffic signal backplates to current standard with high visibility borders. tr2401 Airport Boulevard Bike/Ped Gap Closure Study $300,000 Support for feasibility studies as needed to complete bike/ped network, and support for grant applications. tr2402 El Camino Real Bik/Ped Improvements $300,000
Support for studies to implement Active South City recommendations on El Camino Real and connections to Centennail Trail.
tr2403 Traffic Signal Safety Improvements Project $500,000 Design & Construct new traffic signals at the intersection of Junipero Serra Blvd/Arroyo; Signal improvements/modifications at the intersections of Grand Ave/Spruce Ave, Grand Ave/Maple, Grand Ave/Linden Ave; and install retroreflective...
tr2404 Chestnut Ave & Commercial Ave Intersection Improvement Project $300,000 Design & construct new traffic signals at the intersections to improve pedestrian safety. The improvements include the removal of the “slip lane” and concrete island at the southeast corner that currently provides a free right turn... tr2405 Citywide School Traffic Calming Improvement Project $600,000 Design & construct traffic calming improvements at grades Kindergarten through 12 schools, including 15mph speed reduction.
tr2406 Traffic Studies and Grant Support $1,100,000
Support for any traffic-related studies from the Traffic Advisory Committee, Neighborhood meetings or as needed, and support for grant applications as needed.
tr2407 Bay Trail - Centennial Way Trail Gap Closure $100,000 A feasibility study to create a Class I trail connecting the Centennial Way Trail and Bay Trail. The project seeks to link the City’s two largest multi-use trails, enable a low-stress bikeway connection to the waterfront, and enhance... tr2408 Signalized Intersection Battery Back up Citywide $2,000,000 Upgrade signalized intersection Citywide with Battery Backup Systems. Approximately 50 intersections in the City are without BBS.
tr2409 Oyster Point Blvd - Corridor Study to support Bike/Ped and Complete Streets $100,000 Support for feasibility studies as needed to complete bike/ped network, transit, and support for grant applications. tr2410 Spruce Avenue - Corridor Study to support Bike/Ped and Complete Streets $100,000 Support for feasibility studies as needed to complete bike/ped network, transit, and support for grant applications. tr2411 Gateway Boulevard - Corridor Study to support Bike/Ped and Complete Streets $100,000 Support for feasibility studies as needed to complete bike/ped network, transit, and support for grant applications. tr2412 Forbes Boulevard - Corridor Study to support Bike/Ped and Complete Streets $100,000 Support for feasibility studies as needed to complete bike/ped network, transit, and support for grant applications.

City of South San Francisco | FY2023-24 Budget Book Page 24 tr2413 El Camino Real at 1st to Centennial Trail Gap Closure $200,000 Install bike and pedestrian signalized intersection at ECR @ 1st and connect the gap to Centennial Trail at 1st Street to set up for grant funding.

Total: $120,299,601
City of South San Francisco | FY2023-24 Budget Book Page 25

APPENDIX
City of South San Francisco | FY2023-24 Budget Book Page 26

CAPITAL IMPROVEMENT PLAN

REQUESTS
City of South San Francisco | FY2023-24 Budget Book Page 27 pf2002 Oyster Point Marina Water-Taxi Ferry Terminal - Phase 1 (Spit)
Overview
Request Owner Amanda Parker, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number pf2002
Description
Engineering and design work to upgrade Oyster Point peninsula, the adjacent guest dock and design a new water-taxi ferry terminal and passenger building. The improvements will eliminate flooding over the landfill and account for sea level rise.

Details
Project Manager Matthew Ruble
Funding to Date $1,700,000.00
Expenditures to Date $1,251,882.50
Existing / New Project Existing project
Project Category Public Facilities project
City of South San Francisco | FY2023-24 Budget Book Page 55 Capital Cost Breakdown
Capital Cost To Date FY2024 Total
Construction $1,653,655 $1,653,655
Contingency $46,345 $46,345
Other $0 $0
Total $1,700,000 $0 $1,700,000
Capital Cost
Total To Date
$1,700,000
FY2024 Budget
$0
Total Budget (all years)
$0.01
Project Total
$1.7M
Capital Cost by Year
Other
2024 $.01
$0 $0.003 $0.005 $0.008 $0.01
Capital Cost for Budgeted Years
TOTAL $.01
Other (100%) $.01
City of South San Francisco | FY2023-24 Budget Book Page 56 Funding Sources Breakdown
Funding Sources To Date FY2024 Total
General Fund $350,000 $890,000 $1,240,000
Measure A $350,000 $350,000
American Recovery Plan $1,000,000 -$890,000 $110,000
Total $1,700,000 $0 $1,700,000
Funding Sources
Total To Date
$1,700,000
FY2024 Budget
$0
Total Budget (all years)
$0.01
Project Total
$1.7M
Funding Sources by Year
American Recovery Plan General Fund
2024 $.01
$-1000000 $-500000 $0 $500K
Funding Sources for Budgeted Years
TOTAL $.01
American Recovery Plan (-100%)$-890,000.00
General Fund (100%) $890,000.01
City of South San Francisco | FY2023-24 Budget Book Page 57 pf2203 Terrabay Gymnasium HVAC Replacement
Overview
Request Owner Marissa Garren, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number pf2203
Description
Replace the heating, ventilating, and air conditioning systems (HVAC) at the Terrabay Gymnasium and Recreation Center which has reached the end of its life and is no longer functioning.

Details
Project Manager Brian Crume
Funding to Date $530,000
Expenditures to Date $11,000
Existing / New Project Existing project
Project Category Public Facilities project
City of South San Francisco | FY2023-24 Budget Book Page 79 Capital Cost Breakdown
Capital Cost To Date FY2024 Total
Construction $11,000 $100,000 $111,000
Total $11,000 $100,000 $111,000
Capital Cost
Total To Date
$11,000
FY2024 Budget
$100,000
Total Budget (all years)
$100K
Project Total
$111K
Capital Cost by Year
Construction
2024 $100,000.00
$0 $25K $50K $75K $100K
Capital Cost for Budgeted Years
TOTAL $100,000.00
Construction (100%) $100,000.00
City of South San Francisco | FY2023-24 Budget Book Page 80 Funding Sources Breakdown
Funding Sources To Date FY2024 Total
Infrastructure Reserves $530,000 $100,000 $630,000
Total $530,000 $100,000 $630,000
Funding Sources
Total To Date
$530,000
FY2024 Budget
$100,000
Total Budget (all years)
$100K
Project Total
$630K
Funding Sources by Year
Infrastructure Reserves
2024 $100,000.00
$0 $25K $50K $75K $100K
Funding Sources for Budgeted Years
TOTAL $100,000.00
Infrastructure Reserves (100%) $100,000.00
City of South San Francisco | FY2023-24 Budget Book Page 81 pf2305 Free Public Wifi Network
Overview
Request Owner Marissa Garren, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number pf2305
Description
To build a public Wifi network and pilot in the uptown/downtown area, providing 100MB download and 25MB upload speeds.

Details
Project Manager Tony Barrera
Funding to Date $850,400.00
Expenditures to Date $709,893.20
Existing / New Project Existing project
Project Category Public Facilities project
City of South San Francisco | FY2023-24 Budget Book Page 103 Capital Cost Breakdown
Capital Cost To Date FY2024 Total
Construction $709,893 -$140,400 $569,493
Total $709,893 -$140,400 $569,493
Capital Cost
Total To Date
$709,893
Total Budget (all years)
$-140400
Project Total
$569.493K
Capital Cost by Year
Construction
2024 $-140,400.0000
$-140400
Capital Cost for Budgeted Years
TOTAL $-140,400.0000
Construction $-140,400.0000
City of South San Francisco | FY2023-24 Budget Book Page 104 Funding Sources Breakdown
Funding Sources To Date FY2024 Total
General Fund $10,000 $10,000
Infrastructure Reserves $700,000 $700,000
Total $700,000 $10,000 $710,000
Funding Sources
Total To Date
$850,400
Total Budget (all years)
$-140400
Project Total
$710K
Funding Sources by Year
American Recovery Plan General Fund
2024 $-140,400.0000
$-160000 $-120000 $-80000 $-40000 $0
Funding Sources for Budgeted Years
TOTAL $-140,400.0000
American Recovery Plan (-1504%)$-150,400.00
General Fund (100%) $10,000.00
City of South San Francisco | FY2023-24 Budget Book Page 105 pf2401 City Facilities Door Access Controls
Overview
Request Owner Marissa Garren, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number pf2401
Description
Implementation of an access control system to facilitate quick and convenient access for authorized personnel while restricting access to unauthorized individuals . This initiative was identified as part of the 2017 IT Strategic Plan.

Details
Project Manager Tony Barrera / Brian Crume
Funding to Date $0
Expenditures to Date $0
Existing / New Project New project
Project Category Public Facilities project
City of South San Francisco | FY2023-24 Budget Book Page 112 Capital Cost Breakdown
Capital Cost FY2024 FY2025 Total
Construction $250,000 $250,000 $500,000
Total $250,000 $250,000 $500,000
Capital Cost
FY2024 Budget
$250,000
Total Budget (all years)
$500K
Project Total
$500K
Capital Cost by Year
Construction
2024
2025
$250,000.00
$250,000.00
$0 $60K $120K $180K $240K
Capital Cost for Budgeted Years
TOTAL $500,000.00
Construction (100%) $500,000.00
City of South San Francisco | FY2023-24 Budget Book Page 113 Funding Sources Breakdown
Funding Sources FY2024 FY2025 Total
Infrastructure Reserves $250,000 $250,000 $500,000
Total $250,000 $250,000 $500,000
Funding Sources
FY2024 Budget
$250,000
Total Budget (all years)
$500K
Project Total
$500K
Funding Sources by Year
Infrastructure Reserves
2024
2025
$250,000.00
$250,000.00
$0 $60K $120K $180K $240K
Funding Sources for Budgeted Years
TOTAL $500,000.00
Infrastructure Reserves (100%) $500,000.00
City of South San Francisco | FY2023-24 Budget Book Page 114 pf2402 Parking District Lot Rehabilitation
Overview
Request Owner Marissa Garren, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number pf2402
Description
Paving, striping and maintenance of all city surface lots within the Parking District.

Details
Project Manager Dave Bockhaus
Funding to Date $0
Expenditures to Date $0
Existing / New Project New project
Project Category Public Facilities project
City of South San Francisco | FY2023-24 Budget Book Page 115 Capital Cost Breakdown
Capital Cost FY2024 Total
Construction $100,000 $100,000
Total $100,000 $100,000
Capital Cost
FY2024 Budget
$100,000
Total Budget (all years)
$100K
Project Total
$100K
Capital Cost by Year
Construction
2024 $100,000.00
$0 $25K $50K $75K $100K
Capital Cost for Budgeted Years
TOTAL $100,000.00
Construction (100%) $100,000.00
City of South San Francisco | FY2023-24 Budget Book Page 116 Funding Sources Breakdown
Funding Sources FY2024 Total
Parking District Fund $100,000 $100,000
Total $100,000 $100,000
Funding Sources
FY2024 Budget
$100,000
Total Budget (all years)
$100K
Project Total
$100K
Funding Sources by Year
Parking District Fund
2024 $100,000.00
$0 $25K $50K $75K $100K
Funding Sources for Budgeted Years
TOTAL $100,000.00
Parking District Fund (100%) $100,000.00
City of South San Francisco | FY2023-24 Budget Book Page 117 pk2401 Replacement of Light Structures at Terrabay Recreation Center
Overview
Request Owner Marissa Garren, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number pk2401
Description
Replace nine light poles that are needed for parking lot safety lighting and tennis court usage.

Details
Project Manager Joshua Richardson
Funding to Date $0
Expenditures to Date $0
Existing / New Project New project
Project Category Parks project
City of South San Francisco | FY2023-24 Budget Book Page 172 Capital Cost Breakdown
Capital Cost FY2024 Total
Design $250,000 $250,000
Construction $250,000 $250,000
Total $500,000 $500,000
Capital Cost
FY2024 Budget
$500,000
Total Budget (all years)
$500K
Project Total
$500K
Capital Cost by Year
Construction Design
2024 $500,000.00
$0 $120K $240K $360K $480K
Capital Cost for Budgeted Years
TOTAL $500,000.00
Construction (50%) $250,000.00
Design (50%) $250,000.00
City of South San Francisco | FY2023-24 Budget Book Page 173 Funding Sources Breakdown
Funding Sources FY2024 Total
Infrastructure Reserves $500,000 $500,000
Total $500,000 $500,000
Funding Sources
FY2024 Budget
$500,000
Total Budget (all years)
$500K
Project Total
$500K
Funding Sources by Year
Infrastructure Reserves
2024 $500,000.00
$0 $120K $240K $360K $480K
Funding Sources for Budgeted Years
TOTAL $500,000.00
Infrastructure Reserves (100%) $500,000.00
City of South San Francisco | FY2023-24 Budget Book Page 174 pk2402 Dundee Park Remodel
Overview
Request Owner Marissa Garren, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number pk2402
Description
Renovation of Dundee Park includes a new design, playground, and sports courts.

Details
Project Manager Joshua Richardson
Funding to Date $0
Expenditures to Date $0
Existing / New Project New project
Project Category Parks project
City of South San Francisco | FY2023-24 Budget Book Page 175 Capital Cost Breakdown
Capital Cost FY2024 Total
Preliminary Study $600,000 $600,000
Total $600,000 $600,000
Capital Cost
FY2024 Budget
$600,000
Total Budget (all years)
$600K
Project Total
$600K
Capital Cost by Year
Preliminary Study
2024 $600,000.00
$0 $150K $300K $450K $600K
Capital Cost for Budgeted Years
TOTAL $600,000.00
Preliminary Study (100%) $600,000.00
City of South San Francisco | FY2023-24 Budget Book Page 176 Funding Sources Breakdown
Funding Sources FY2024 Total
Infrastructure Reserves $600,000 $600,000
Total $600,000 $600,000
Funding Sources
FY2024 Budget
$600,000
Total Budget (all years)
$600K
Project Total
$600K
Funding Sources by Year
Infrastructure Reserves
2024 $600,000.00
$0 $150K $300K $450K $600K
Funding Sources for Budgeted Years
TOTAL $600,000.00
Infrastructure Reserves (100%) $600,000.00
City of South San Francisco | FY2023-24 Budget Book Page 177 pk2403 Brentwood Park Irrigation Infrastructure Upgrade Overview
Request Owner Marissa Garren, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number pk2403
Description
Irrigating the hillside in the back of the park to plant trees after mitigation and removal of hazardous trees.

Details
Project Manager Joshua Richardson
Funding to Date $0
Expenditures to Date $0
Existing / New Project New project
Project Category Parks project
City of South San Francisco | FY2023-24 Budget Book Page 178 Capital Cost Breakdown
Capital Cost FY2024 FY2025 Total
Preliminary Study $400,000 $400,000
Construction $100,000 $100,000
Total $400,000 $100,000 $500,000
Capital Cost
FY2024 Budget
$400,000
Total Budget (all years)
$500K
Project Total
$500K
Capital Cost by Year
Construction Preliminary Study
2024
2025
$400,000.00
$100,000.00
$0 $100K $200K $300K $400K
Capital Cost for Budgeted Years
TOTAL $500,000.00
Construction (20%) $100,000.00
Preliminary Study (80%) $400,000.00
City of South San Francisco | FY2023-24 Budget Book Page 179 Funding Sources Breakdown
Funding Sources FY2024 FY2025 Total
Infrastructure Reserves $400,000 $100,000 $500,000
Total $400,000 $100,000 $500,000
Funding Sources
FY2024 Budget
$400,000
Total Budget (all years)
$500K
Project Total
$500K
Funding Sources by Year
Infrastructure Reserves
2024
2025
$400,000.00
$100,000.00
$0 $100K $200K $300K $400K
Funding Sources for Budgeted Years
TOTAL $500,000.00
Infrastructure Reserves (100%) $500,000.00
City of South San Francisco | FY2023-24 Budget Book Page 180 pk2404 Common Greens Rehabilitation Study & Implementation Overview
Request Owner Marissa Garren, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number pk2404
Description
Pre-design for study and implementation of common greens rehabilitation.

Details
Project Manager Joshua Richardson
Funding to Date $0
Expenditures to Date $0
Existing / New Project New project
Project Category Parks project
City of South San Francisco | FY2023-24 Budget Book Page 181 Capital Cost Breakdown
Capital Cost FY2024 Total
Preliminary Study $500,000 $500,000
Total $500,000 $500,000
Capital Cost
FY2024 Budget
$500,000
Total Budget (all years)
$500K
Project Total
$500K
Capital Cost by Year
Preliminary Study
2024 $500,000.00
$0 $120K $240K $360K $480K
Capital Cost for Budgeted Years
TOTAL $500,000.00
Preliminary Study (100%) $500,000.00
City of South San Francisco | FY2023-24 Budget Book Page 182 Funding Sources Breakdown
Funding Sources FY2024 Total
Common Greens $500,000 $500,000
Total $500,000 $500,000
Funding Sources
FY2024 Budget
$500,000
Total Budget (all years)
$500K
Project Total
$500K
Funding Sources by Year
Common Greens
2024 $500,000.00
$0 $120K $240K $360K $480K
Funding Sources for Budgeted Years
TOTAL $500,000.00
Common Greens (100%) $500,000.00
City of South San Francisco | FY2023-24 Budget Book Page 183 pk2405 Clay Park Court Resurfacing
Overview
Request Owner Marissa Garren, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number pk2405
Description
Resurfacing of the basketball court at Clay Park.

Details
Project Manager Joshua Richardson
Funding to Date $0
Expenditures to Date $0
Existing / New Project New project
Project Category Parks project
City of South San Francisco | FY2023-24 Budget Book Page 184 Capital Cost Breakdown
Capital Cost FY2024 Total
Construction $50,000 $50,000
Total $50,000 $50,000
Capital Cost
FY2024 Budget
$50,000
Total Budget (all years)
$50K
Project Total
$50K
Capital Cost by Year
Construction
2024 $50,000.00
$0 $12K $24K $36K $48K
Capital Cost for Budgeted Years
TOTAL $50,000.00
Construction (100%) $50,000.00
City of South San Francisco | FY2023-24 Budget Book Page 185 Funding Sources Breakdown
Funding Sources FY2024 Total
Infrastructure Reserves $50,000 $50,000
Total $50,000 $50,000
Funding Sources
FY2024 Budget
$50,000
Total Budget (all years)
$50K
Project Total
$50K
Funding Sources by Year
Infrastructure Reserves
2024 $50,000.00
$0 $12K $24K $36K $48K
Funding Sources for Budgeted Years
TOTAL $50,000.00
Infrastructure Reserves (100%) $50,000.00
City of South San Francisco | FY2023-24 Budget Book Page 186 sd2401 Storm Damage Repairs
Overview
Request Owner Marissa Garren, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number sd2401
Description
Repairs of damage caused by mudslides from recent storms of late December 2022-early January 2023.

Details
Project Manager Matthew Ruble
Funding to Date $0
Expenditures to Date $0
Existing / New Project New project
Project Category Storm Drains project
City of South San Francisco | FY2023-24 Budget Book Page 217 Capital Cost Breakdown
Capital Cost FY2024 Total
Design $1,000,000 $1,000,000
Construction $1,000,000 $1,000,000
Total $2,000,000 $2,000,000
Capital Cost
FY2024 Budget
$2,000,000
Total Budget (all years)
$2M
Project Total
$2M
Capital Cost by Year
Construction Design
2024 $2,000,000.00
$0 $500K $1M $1.5M $2M
Capital Cost for Budgeted Years
TOTAL $2,000,000.00
Construction (50%) $1,000,000.00
Design (50%) $1,000,000.00
City of South San Francisco | FY2023-24 Budget Book Page 218 Funding Sources Breakdown
Funding Sources FY2024 Total
Storm Water $2,000,000 $2,000,000
Total $2,000,000 $2,000,000
Funding Sources
FY2024 Budget
$2,000,000
Total Budget (all years)
$2M
Project Total
$2M
Funding Sources by Year
Storm Water
2024 $2,000,000.00
$0 $500K $1M $1.5M $2M
Funding Sources for Budgeted Years
TOTAL $2,000,000.00
Storm Water (100%) $2,000,000.00
City of South San Francisco | FY2023-24 Budget Book Page 219 ss1502 Pump Station No. 4 Redundant Force Main
Overview
Request Owner Amanda Parker, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number ss1502
Description
The PS4 is the only main conveyance line East of 101.

Details
Project Manager Brian Schumacker
Funding to Date $8,100,000.00
Expenditures to Date $1,064,712.58
Existing / New Project Existing project
Project Category Sanitary Sewer project
City of South San Francisco | FY2023-24 Budget Book Page 229 Capital Cost Breakdown
Capital Cost To Date FY2024 FY2025 Total
Project Management $909,379 $909,379
Preliminary Study $6,931,653 $6,931,653
Design $258,968 $258,968
Construction $4,050,000 $4,050,000 $8,100,000
Total $8,100,000 $4,050,000 $4,050,000 $16,200,000
Capital Cost
Total To Date
$8,100,000
FY2024 Budget
$4,050,000
Total Budget (all years)
$8.1M
Project Total
$16.2M
Capital Cost by Year
Construction
2024
2025
$4,050,000.00
$4,050,000.00
$0 $1M $2M $3M $4M
Capital Cost for Budgeted Years
TOTAL $8,100,000.00
Construction (100%) $8,100,000.00
City of South San Francisco | FY2023-24 Budget Book Page 230 Funding Sources Breakdown
Funding Sources To Date FY2024 FY2025 Total
Sewer Enterprise $8,100,000 $4,050,000 $4,050,000 $16,200,000 Total $8,100,000 $4,050,000 $4,050,000 $16,200,000
Funding Sources
Total To Date
$8,100,000
FY2024 Budget
$4,050,000
Total Budget (all years)
$8.1M
Project Total
$16.2M
Funding Sources by Year
Sewer Enterprise
2024
2025
$4,050,000.00
$4,050,000.00
$0 $1M $2M $3M $4M
Funding Sources for Budgeted Years
TOTAL $8,100,000.00
Sewer Enterprise (100%) $8,100,000.00
City of South San Francisco | FY2023-24 Budget Book Page 231 ss1801 Sewer Master Plan GP Update
Overview
Request Owner Amanda Parker, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number ss1801
Description
Design and model update to the General Plan adopted in late 2022. Review of the model will either verify or update the CIP sizing recommendations from the Citywide Sewer Master Plan updated in early 2022.

Details
Project Manager Jason Hallare
Funding to Date $725,000.00
Expenditures to Date $723,668.22
Existing / New Project Existing project
Project Category Sanitary Sewer project
City of South San Francisco | FY2023-24 Budget Book Page 247 Capital Cost Breakdown
Capital Cost To Date FY2024 Total
Project Management $14,506 $14,506
Preliminary Study $676,989 $676,989
Design $33,505 $90,000 $123,505
Total $725,000 $90,000 $815,000
Capital Cost
Total To Date
$725,000
FY2024 Budget
$90,000
Total Budget (all years)
$90K
Project Total
$815K
Capital Cost by Year
Design
2024 $90,000.00
$0 $25K $50K $75K
Capital Cost for Budgeted Years
TOTAL $90,000.00
Design (100%) $90,000.00
City of South San Francisco | FY2023-24 Budget Book Page 248 Funding Sources Breakdown
Funding Sources To Date FY2024 Total
Sewer Enterprise $725,000 $45,000 $770,000
East of 101 Sewer Impact Fee $45,000 $45,000
Total $725,000 $90,000 $815,000
Funding Sources
Total To Date
$725,000
FY2024 Budget
$90,000
Total Budget (all years)
$90K
Project Total
$815K
Funding Sources by Year
East of 101 Sewer Impact Fee Sewer Enterprise
2024 $90,000.00
$0 $25K $50K $75K
Funding Sources for Budgeted Years
TOTAL $90,000.00
East of 101 Sewer Impact Fee (50%)$45,000.00
Sewer Enterprise (50%) $45,000.00
City of South San Francisco | FY2023-24 Budget Book Page 249 ss2001 Sanitary Sewer Rehabilitation
Overview
Request Owner Amanda Parker, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number ss2001
Description
Ongoing maintenance required for sanitary sewer per the Sanitary Sewer Master Plan.

Details
Project Manager Lawrence Henriquez
Funding to Date $6,075,000
Expenditures to Date $26.55
Existing / New Project Existing project
Project Category Sanitary Sewer project
City of South San Francisco | FY2023-24 Budget Book Page 259 Capital Cost Breakdown
Capital Cost To Date FY2024 FY2025 FY2026 FY2027 Total
Construction $1,000,000 $1,000,000 $1,000,000 $1,000,000 $4,000,000 Other $6,075,000 $6,075,000
Total $6,075,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $10,075,000 Capital Cost
Total To Date
$6,075,000
FY2024 Budget
$1,000,000
Total Budget (all years)
$4M
Project Total
$10.075M
Capital Cost by Year
Construction
2024
2025
2026
2027
$1,000,000.00
$1,000,000.00
$1,000,000.00
$1,000,000.00
$0 $250K $500K $750K $1M
Capital Cost for Budgeted Years
TOTAL $4,000,000.00
Construction (100%) $4,000,000.00
City of South San Francisco | FY2023-24 Budget Book Page 260 Funding Sources Breakdown
Funding Sources To Date FY2024 FY2025 FY2026 FY2027 Total Sewer Enterprise $6,075,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $10,075,000 Total $6,075,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $10,075,000 Funding Sources
Total To Date
$6,075,000
FY2024 Budget
$1,000,000
Total Budget (all years)
$4M
Project Total
$10.075M
Funding Sources by Year
Sewer Enterprise
2024
2025
2026
2027
$1,000,000.00
$1,000,000.00
$1,000,000.00
$1,000,000.00
$0 $250K $500K $750K $1M
Funding Sources for Budgeted Years
TOTAL $4,000,000.00
Sewer Enterprise (100%) $4,000,000.00
City of South San Francisco | FY2023-24 Budget Book Page 261 ss2301 WQCP Diffused Air Flotation Thickener Replacement Overview
Request Owner Amanda Parker, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number ss2301
Description
Upgrade the existing flotation thickeners to accommodate plant processes.

Details
Project Manager Brian Schumacker
Funding to Date $750,000.00
Expenditures to Date $0
Existing / New Project Existing project
Project Category Sanitary Sewer project
City of South San Francisco | FY2023-24 Budget Book Page 268 Capital Cost Breakdown
Capital Cost To Date FY2024 FY2025 Total
Construction $750,000 $4,350,000 $4,350,000 $9,450,000
Total $750,000 $4,350,000 $4,350,000 $9,450,000
Capital Cost
Total To Date
$750,000
FY2024 Budget
$4,350,000
Total Budget (all years)
$8.7M
Project Total
$9.45M
Capital Cost by Year
Construction
2024
2025
$4,350,000.00
$4,350,000.00
$0 $1.2M $2.4M $3.6M
Capital Cost for Budgeted Years
TOTAL $8,700,000.00
Construction (100%) $8,700,000.00
City of South San Francisco | FY2023-24 Budget Book Page 269 Funding Sources Breakdown
Funding Sources To Date FY2024 FY2025 Total
Sewer Enterprise $750,000 $3,178,980 $3,178,980 $7,107,960 San Bruno / NBSU $1,171,020 $1,171,020 $2,342,040
Total $750,000 $4,350,000 $4,350,000 $9,450,000
Funding Sources
Total To Date
$750,000
FY2024 Budget
$4,350,000
Total Budget (all years)
$8.7M
Project Total
$9.45M
Funding Sources by Year
San Bruno / NBSU Sewer Enterprise
2024
2025
$4,350,000.00
$4,350,000.00
$0 $1.2M $2.4M $3.6M
Funding Sources for Budgeted Years
TOTAL $8,700,000.00
San Bruno / NBSU (27%) $2,342,040.00
Sewer Enterprise (73%) $6,357,960.00
City of South San Francisco | FY2023-24 Budget Book Page 270 ss2302 WQCP Sludge Dewatering Improvements
Overview
Request Owner Amanda Parker, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number ss2302
Description
For the design and installation of sludge pretreatment conditioning system to increase biosolids total percent solids with the goal of decreasing hauling and disposal costs, as SB1383 now classifies biosolids as organic.

Details
Project Manager Brian Schumacker
Funding to Date $1,000,000
Expenditures to Date $0
Existing / New Project Existing project
Project Category Sanitary Sewer project
City of South San Francisco | FY2023-24 Budget Book Page 271 Capital Cost Breakdown
Capital Cost To Date FY2024 Total
Construction $1,000,000 $1,000,000 $2,000,000
Total $1,000,000 $1,000,000 $2,000,000
Capital Cost
Total To Date
$1,000,000
FY2024 Budget
$1,000,000
Total Budget (all years)
$1M
Project Total
$2M
Capital Cost by Year
Construction
2024 $1,000,000.00
$0 $250K $500K $750K $1M
Capital Cost for Budgeted Years
TOTAL $1,000,000.00
Construction (100%) $1,000,000.00
City of South San Francisco | FY2023-24 Budget Book Page 272 Funding Sources Breakdown
Funding Sources To Date FY2024 Total
Sewer Enterprise $1,000,000 $730,800 $1,730,800
San Bruno / NBSU $269,200 $269,200
Total $1,000,000 $1,000,000 $2,000,000
Funding Sources
Total To Date
$1,000,000
FY2024 Budget
$1,000,000
Total Budget (all years)
$1M
Project Total
$2M
Funding Sources by Year
San Bruno / NBSU Sewer Enterprise
2024 $1,000,000.00
$0 $250K $500K $750K $1M
Funding Sources for Budgeted Years
TOTAL $1,000,000.00
San Bruno / NBSU (27%) $269,200.00
Sewer Enterprise (73%) $730,800.00
City of South San Francisco | FY2023-24 Budget Book Page 273 ss2401 Oyster Point Sewer Main Upsize
Overview
Request Owner Amanda Parker, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number ss2401
Description
Co-funding agreement with Kilroy to design and construct a sewer main upsize for the Oyster Point sewer main from Gull to Pump Station #2.

Details
Project Manager Jason Hallare
Funding to Date $0
Expenditures to Date $0
Existing / New Project New project
Project Category Sanitary Sewer project
City of South San Francisco | FY2023-24 Budget Book Page 274 Capital Cost Breakdown
Capital Cost FY2024 FY2025 Total
Design $100,000 $4,000,000 $4,100,000
Total $100,000 $4,000,000 $4,100,000
Capital Cost
FY2024 Budget
$100,000
Total Budget (all years)
$4.1M
Project Total
$4.1M
Capital Cost by Year
Design
2024
2025
$100,000.00
$4,000,000.00
$0 $1M $2M $3M $4M
Capital Cost for Budgeted Years
TOTAL $4,100,000.00
Design (100%) $4,100,000.00
City of South San Francisco | FY2023-24 Budget Book Page 275 Funding Sources Breakdown
Funding Sources FY2024 FY2025 Total
East of 101 Sewer Impact Fee $100,000 $4,000,000 $4,100,000 Total $100,000 $4,000,000 $4,100,000
Funding Sources
FY2024 Budget
$100,000
Total Budget (all years)
$4.1M
Project Total
$4.1M
Funding Sources by Year
East of 101 Sewer Impact Fee
2024
2025
$100,000.00
$4,000,000.00
$0 $1M $2M $3M $4M
Funding Sources for Budgeted Years
TOTAL $4,100,000.00
East of 101 Sewer Impact Fee (100%)$4,100,000
City of South San Francisco | FY2023-24 Budget Book Page 276 ss2402 Variable Frequency Drive Modernization Project - WQCP Overview
Request Owner Amanda Parker, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number ss2402
Description
Replacement of variable frequency drive components associated with Plant pumping systems originally installed in 1998.

Details
Project Manager Brian Schumacker
Funding to Date $0
Expenditures to Date $0
Existing / New Project New project
Project Category Sanitary Sewer project
City of South San Francisco | FY2023-24 Budget Book Page 277 Capital Cost Breakdown
Capital Cost FY2024 FY2025 Total
Design $1,000,000 $1,000,000
Construction $1,050,000 $1,050,000
Total $1,000,000 $1,050,000 $2,050,000
Capital Cost
FY2024 Budget
$1,000,000
Total Budget (all years)
$2.05M
Project Total
$2.05M
Capital Cost by Year
Construction Design
2024
2025
$1,000,000.00
$1,050,000.00
$0 $300K $600K $900K
Capital Cost for Budgeted Years
TOTAL $2,050,000.00
Construction (51%) $1,050,000.00
Design (49%) $1,000,000.00
City of South San Francisco | FY2023-24 Budget Book Page 278 Funding Sources Breakdown
Funding Sources FY2024 FY2025 Total
Sewer Enterprise $730,800 $767,340 $1,498,140
San Bruno / NBSU $269,200 $282,660 $551,860
Total $1,000,000 $1,050,000 $2,050,000
Funding Sources
FY2024 Budget
$1,000,000
Total Budget (all years)
$2.05M
Project Total
$2.05M
Funding Sources by Year
San Bruno / NBSU Sewer Enterprise
2024
2025
$1,000,000.00
$1,050,000.00
$0 $300K $600K $900K
Funding Sources for Budgeted Years
TOTAL $2,050,000.00
San Bruno / NBSU (27%) $551,860.00
Sewer Enterprise (73%) $1,498,140.00
City of South San Francisco | FY2023-24 Budget Book Page 279 ss2403 Variable Frequency Drive Replacement Project - Sanitary Pump Stations
Overview
Request Owner Amanda Parker, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number ss2403
Description
Replacement of variable frequency drive components associated with Plant pumping systems originally installed in 1998.

Details
Project Manager Brian Schumacker
Funding to Date $0
Expenditures to Date $0
Existing / New Project New project
Project Category Sanitary Sewer project
City of South San Francisco | FY2023-24 Budget Book Page 280 Capital Cost Breakdown
Capital Cost To Date FY2024 FY2025 Total
Design $1,000,000 $1,000,000
Construction $1,000,000 $980,000 $1,980,000
Total $1,000,000 $1,000,000 $980,000 $2,980,000
Capital Cost
Total To Date
$1,000,000
FY2024 Budget
$1,000,000
Total Budget (all years)
$1.98M
Project Total
$2.98M
Capital Cost by Year
Construction
2024
2025
$1,000,000.00
$980,000.00
$0 $250K $500K $750K $1M
Capital Cost for Budgeted Years
TOTAL $1,980,000.00
Construction (100%) $1,980,000.00
City of South San Francisco | FY2023-24 Budget Book Page 281 Funding Sources Breakdown
Funding Sources FY2024 FY2025 Total
Sewer Enterprise $730,800 $716,184 $1,446,984
San Bruno / NBSU $269,200 $263,816 $533,016
Total $1,000,000 $980,000 $1,980,000
Funding Sources
FY2024 Budget
$1,000,000
Total Budget (all years)
$1.98M
Project Total
$1.98M
Funding Sources by Year
San Bruno / NBSU Sewer Enterprise
2024
2025
$1,000,000.00
$980,000.00
$0 $250K $500K $750K $1M
Funding Sources for Budgeted Years
TOTAL $1,980,000.00
San Bruno / NBSU (27%) $533,016.00
Sewer Enterprise (73%) $1,446,984.00
City of South San Francisco | FY2023-24 Budget Book Page 282 ss2404 Programable Logic Controller Replacement Project - WQCP and Sanitary Pump Stations
Overview
Request Owner Amanda Parker, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number ss2404
Description
Modernization of programable logic controllers at plant and pump stations to replace existing from 1999.

Details
Project Manager Brian Schumacker
Funding to Date $0
Expenditures to Date $0
Existing / New Project New project
Project Category Sanitary Sewer project
City of South San Francisco | FY2023-24 Budget Book Page 283 Capital Cost Breakdown
Capital Cost FY2024 Total
Design $1,000,000 $1,000,000
Construction $1,050,000 $1,050,000
Total $2,050,000 $2,050,000
Capital Cost
FY2024 Budget
$2,050,000
Total Budget (all years)
$2.05M
Project Total
$2.05M
Capital Cost by Year
Construction Design
2024 $2,050,000.00
$0 $500K $1M $1.5M $2M
Capital Cost for Budgeted Years
TOTAL $2,050,000.00
Construction (51%) $1,050,000.00
Design (49%) $1,000,000.00
City of South San Francisco | FY2023-24 Budget Book Page 284 Funding Sources Breakdown
Funding Sources FY2024 Total
Sewer Enterprise $1,498,140 $1,498,140
San Bruno / NBSU $551,860 $551,860
Total $2,050,000 $2,050,000
Funding Sources
FY2024 Budget
$2,050,000
Total Budget (all years)
$2.05M
Project Total
$2.05M
Funding Sources by Year
San Bruno / NBSU Sewer Enterprise
2024 $2,050,000.00
$0 $500K $1M $1.5M $2M
Funding Sources for Budgeted Years
TOTAL $2,050,000.00
San Bruno / NBSU (27%) $551,860.00
Sewer Enterprise (73%) $1,498,140.00
City of South San Francisco | FY2023-24 Budget Book Page 285 ss2405 Headworks No. 1 Grit Chamber Tower Rehabilitation Project - WQCP
Overview
Request Owner Amanda Parker, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number ss2405
Description
Evaluate, design and construct replacement grit tower structures installed in 1951.

Details
Project Manager Brian Schumacker
Funding to Date $0
Expenditures to Date $0
Existing / New Project New project
Project Category Sanitary Sewer project
City of South San Francisco | FY2023-24 Budget Book Page 286 Capital Cost Breakdown
Capital Cost FY2024 FY2025 Total
Design $2,000,000 $2,000,000
Construction $3,000,000 $3,000,000
Total $2,000,000 $3,000,000 $5,000,000
Capital Cost
FY2024 Budget
$2,000,000
Total Budget (all years)
$5M
Project Total
$5M
Capital Cost by Year
Construction Design
2024
2025
$2,000,000.00
$3,000,000.00
$0 $800K $1.6M $2.4M
Capital Cost for Budgeted Years
TOTAL $5,000,000.00
Construction (60%) $3,000,000.00
Design (40%) $2,000,000.00
City of South San Francisco | FY2023-24 Budget Book Page 287 Funding Sources Breakdown
Funding Sources FY2024 FY2025 Total
Sewer Enterprise $1,461,600 $2,192,400 $3,654,000
San Bruno / NBSU $538,400 $807,600 $1,346,000
Total $2,000,000 $3,000,000 $5,000,000
Funding Sources
FY2024 Budget
$2,000,000
Total Budget (all years)
$5M
Project Total
$5M
Funding Sources by Year
San Bruno / NBSU Sewer Enterprise
2024
2025
$2,000,000.00
$3,000,000.00
$0 $800K $1.6M $2.4M
Funding Sources for Budgeted Years
TOTAL $5,000,000.00
San Bruno / NBSU (27%) $1,346,000.00
Sewer Enterprise (73%) $3,654,000.00
City of South San Francisco | FY2023-24 Budget Book Page 288 ss2406 Transformer K Replacement Project - WQCP
Overview
Request Owner Amanda Parker, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number ss2406
Description
Engineer, design and install replacement Transformer K originally installed in 1991.

Details
Project Manager Brian Schumacker
Funding to Date $0
Expenditures to Date $0
Existing / New Project New project
Project Category Sanitary Sewer project
City of South San Francisco | FY2023-24 Budget Book Page 289 Capital Cost Breakdown
Capital Cost FY2024 Total
Design $100,000 $100,000
Construction $100,000 $100,000
Total $200,000 $200,000
Capital Cost
FY2024 Budget
$200,000
Total Budget (all years)
$200K
Project Total
$200K
Capital Cost by Year
Construction Design
2024 $200,000.00
$0 $50K $100K $150K $200K
Capital Cost for Budgeted Years
TOTAL $200,000.00
Construction (50%) $100,000.00
Design (50%) $100,000.00
City of South San Francisco | FY2023-24 Budget Book Page 290 Funding Sources Breakdown
Funding Sources FY2024 Total
Sewer Enterprise $146,160 $146,160
San Bruno / NBSU $53,840 $53,840
Total $200,000 $200,000
Funding Sources
FY2024 Budget
$200,000
Total Budget (all years)
$200K
Project Total
$200K
Funding Sources by Year
San Bruno / NBSU Sewer Enterprise
2024 $200,000.00
$0 $50K $100K $150K $200K
Funding Sources for Budgeted Years
TOTAL $200,000.00
San Bruno / NBSU (27%) $53,840.00
Sewer Enterprise (73%) $146,160.00
City of South San Francisco | FY2023-24 Budget Book Page 291 ss2407 SB 1383 Organics Diversion Mandate Compliance and Cogeneration Expansion Project - WQCP
Overview
Request Owner Amanda Parker, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number ss2407
Description
Evaluate, engineer, and design processing and storage equipment to comply with SB 1383 mandate and enhance renewable biogas production. This project will expand sustainable onsite power generation and heat recovery.

Details
Project Manager Brian Schumacker
Funding to Date $0
Expenditures to Date $0
Existing / New Project New project
Project Category Sanitary Sewer project
City of South San Francisco | FY2023-24 Budget Book Page 292 Capital Cost Breakdown
Capital Cost FY2024 FY2025 FY2026 FY2027 Total
Design $5,000,000 $5,000,000
Construction $3,300,000 $3,300,000 $3,300,000 $9,900,000 Total $5,000,000 $3,300,000 $3,300,000 $3,300,000 $14,900,000 Capital Cost
FY2024 Budget
$5,000,000
Total Budget (all years)
$14.9M
Project Total
$14.9M
Capital Cost by Year
Construction Design
2024
2025
2026
2027
$5,000,000.00
$3,300,000.00
$3,300,000.00
$3,300,000.00
$0 $1.2M $2.4M $3.6M $4.8M
Capital Cost for Budgeted Years
TOTAL $14,900,000.00
Construction (66%) $9,900,000.00
Design (34%) $5,000,000.00
City of South San Francisco | FY2023-24 Budget Book Page 293 Funding Sources Breakdown
Funding Sources FY2024 FY2025 FY2026 FY2027 Total
Sewer Enterprise $3,654,000 $2,411,640 $2,411,640 $2,411,640 $10,888,920 San Bruno / NBSU $1,346,000 $888,360 $888,360 $888,360 $4,011,080 Total $5,000,000 $3,300,000 $3,300,000 $3,300,000 $14,900,000 Funding Sources
FY2024 Budget
$5,000,000
Total Budget (all years)
$14.9M
Project Total
$14.9M
Funding Sources by Year
San Bruno / NBSU Sewer Enterprise
2024
2025
2026
2027
$5,000,000.00
$3,300,000.00
$3,300,000.00
$3,300,000.00
$0 $1.2M $2.4M $3.6M $4.8M
Funding Sources for Budgeted Years
TOTAL $14,900,000.00
San Bruno / NBSU (27%) $4,011,080.00
Sewer Enterprise (73%) $10,888,920.00
City of South San Francisco | FY2023-24 Budget Book Page 294 ss2408 Biosolids Drying and Recycling Project - WQCP -Project 2 Overview
Request Owner Amanda Parker, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number ss2408
Description
Evaluate, design, and construct equipment associated with decreased moisture content of biosolids to comply with SB 1383 mandate. Renewable products such as biochar, soil amendments, and fly ash enhancers.

Details
Project Manager Brian Schumacker
Funding to Date $0
Expenditures to Date $0
Existing / New Project New project
Project Category Sanitary Sewer project
City of South San Francisco | FY2023-24 Budget Book Page 295 Capital Cost Breakdown
Capital Cost FY2024 FY2025 FY2026 Total
Design $1,000,000 $1,000,000
Construction $4,500,000 $4,500,000 $9,000,000
Total $1,000,000 $4,500,000 $4,500,000 $10,000,000
Capital Cost
FY2024 Budget
$1,000,000
Total Budget (all years)
$10M
Project Total
$10M
Capital Cost by Year
Construction Design
2024
2025
2026
$1,000,000.00
$4,500,000.00
$4,500,000.00
$0 $1.2M $2.4M $3.6M
Capital Cost for Budgeted Years
TOTAL $10,000,000.00
Construction (90%) $9,000,000.00
Design (10%) $1,000,000.00
City of South San Francisco | FY2023-24 Budget Book Page 296 Funding Sources Breakdown
Funding Sources FY2024 FY2025 FY2026 Total
Sewer Enterprise $730,800 $3,288,600 $3,288,600 $7,308,000 San Bruno / NBSU $269,200 $1,211,400 $1,211,400 $2,692,000 Total $1,000,000 $4,500,000 $4,500,000 $10,000,000
Funding Sources
FY2024 Budget
$1,000,000
Total Budget (all years)
$10M
Project Total
$10M
Funding Sources by Year
San Bruno / NBSU Sewer Enterprise
2024
2025
2026
$1,000,000.00
$4,500,000.00
$4,500,000.00
$0 $1.2M $2.4M $3.6M
Funding Sources for Budgeted Years
TOTAL $10,000,000.00
San Bruno / NBSU (27%) $2,692,000.00
Sewer Enterprise (73%) $7,308,000.00
City of South San Francisco | FY2023-24 Budget Book Page 297 ss2409 Industrial Coating Reapplication Project - WQCP and Pump Stations
Overview
Request Owner Amanda Parker, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number ss2409
Description
Project to maintain applied industrial coatings to Plant and pump station metal assets.

Details
Project Manager Brian Schumacker
Funding to Date $0
Expenditures to Date $0
Existing / New Project New project
Project Category Sanitary Sewer project
City of South San Francisco | FY2023-24 Budget Book Page 298 Capital Cost Breakdown
Capital Cost FY2024 FY2025 FY2026 FY2027 Total
Construction $2,000,000 $1,000,000 $1,000,000 $1,000,000 $5,000,000 Total $2,000,000 $1,000,000 $1,000,000 $1,000,000 $5,000,000 Capital Cost
FY2024 Budget
$2,000,000
Total Budget (all years)
$5M
Project Total
$5M
Capital Cost by Year
Construction
2024
2025
2026
2027
$2,000,000.00
$1,000,000.00
$1,000,000.00
$1,000,000.00
$0 $500K $1M $1.5M $2M
Capital Cost for Budgeted Years
TOTAL $5,000,000.00
Construction (100%) $5,000,000.00
City of South San Francisco | FY2023-24 Budget Book Page 299 Funding Sources Breakdown
Funding Sources FY2024 FY2025 FY2026 FY2027 Total
Sewer Enterprise $1,461,600 $730,800 $730,800 $730,800 $3,654,000 San Bruno / NBSU $538,400 $269,200 $269,200 $269,200 $1,346,000 Total $2,000,000 $1,000,000 $1,000,000 $1,000,000 $5,000,000 Funding Sources
FY2024 Budget
$2,000,000
Total Budget (all years)
$5M
Project Total
$5M
Funding Sources by Year
San Bruno / NBSU Sewer Enterprise
2024
2025
2026
2027
$2,000,000.00
$1,000,000.00
$1,000,000.00
$1,000,000.00
$0 $500K $1M $1.5M $2M
Funding Sources for Budgeted Years
TOTAL $5,000,000.00
San Bruno / NBSU (27%) $1,346,000.00
Sewer Enterprise (73%) $3,654,000.00
City of South San Francisco | FY2023-24 Budget Book Page 300 ss2410 WQCP Operations Control Center Rehabilitation Project - WQCP Overview
Request Owner Amanda Parker, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number ss2410
Description
Project to modernize operations control center to achieve the following goals - 1) better ergonomics, 2) replacement terminals for Plant SCAEDA supervisory control and data acquisition, 3) replacement of HVAC system.

Details
Project Manager Brian Schumacker
Funding to Date $0
Expenditures to Date $0
Existing / New Project New project
Project Category Sanitary Sewer project
City of South San Francisco | FY2023-24 Budget Book Page 301 Capital Cost Breakdown
Capital Cost FY2024 FY2025 Total
Design $200,000 $800,000 $1,000,000
Total $200,000 $800,000 $1,000,000
Capital Cost
FY2024 Budget
$200,000
Total Budget (all years)
$1M
Project Total
$1M
Capital Cost by Year
Design
2024
2025
$200,000.00
$800,000.00
$0 $200K $400K $600K $80…
Capital Cost for Budgeted Years
TOTAL $1,000,000.00
Design (100%) $1,000,000.00
City of South San Francisco | FY2023-24 Budget Book Page 302 Funding Sources Breakdown
Funding Sources FY2024 FY2025 Total
Sewer Enterprise $146,160 $584,640 $730,800
San Bruno / NBSU $53,840 $215,360 $269,200
Total $200,000 $800,000 $1,000,000
Funding Sources
FY2024 Budget
$200,000
Total Budget (all years)
$1M
Project Total
$1M
Funding Sources by Year
San Bruno / NBSU Sewer Enterprise
2024
2025
$200,000.00
$800,000.00
$0 $200K $400K $600K $80…
Funding Sources for Budgeted Years
TOTAL $1,000,000.00
San Bruno / NBSU (27%) $269,200.00
Sewer Enterprise (73%) $730,800.00
City of South San Francisco | FY2023-24 Budget Book Page 303 ss2411 NPDES Permit Compliance Upgrade (nutrient removal) Overview
Request Owner Amanda Parker, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number ss2411
Description
Participate in a regional study.

Details
Project Manager Brian Schumacker
Funding to Date $0
Expenditures to Date $0
Existing / New Project New project
Project Category Sanitary Sewer project
City of South San Francisco | FY2023-24 Budget Book Page 304 Capital Cost Breakdown
Capital Cost FY2024 Total
Design $200,000 $200,000
Construction $800,000 $800,000
Total $1,000,000 $1,000,000
Capital Cost
FY2024 Budget
$1,000,000
Total Budget (all years)
$1M
Project Total
$1M
Capital Cost by Year
Construction Design
2024 $1,000,000.00
$0 $250K $500K $750K $1M
Capital Cost for Budgeted Years
TOTAL $1,000,000.00
Construction (80%) $800,000.00
Design (20%) $200,000.00
City of South San Francisco | FY2023-24 Budget Book Page 305 Funding Sources Breakdown
Funding Sources FY2024 Total
Sewer Enterprise $730,800 $730,800
San Bruno / NBSU $269,200 $269,200
Total $1,000,000 $1,000,000
Funding Sources
FY2024 Budget
$1,000,000
Total Budget (all years)
$1M
Project Total
$1M
Funding Sources by Year
San Bruno / NBSU Sewer Enterprise
2024 $1,000,000.00
$0 $250K $500K $750K $1M
Funding Sources for Budgeted Years
TOTAL $1,000,000.00
San Bruno / NBSU (27%) $269,200.00
Sewer Enterprise (73%) $730,800.00
City of South San Francisco | FY2023-24 Budget Book Page 306 st1703 Bridge Preventative Maintenance Program
Overview
Request Owner Amanda Parker, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number st1703
Description
This project will conduct preventative maintenance on ten (10) city bridges including: Colma Creek Bridge at Produce Avenue, Canal Bridge at Linden Avenue, two bridges over San Bruno Channel over N. Access Road, Colma Creek Bridge at Spruce Ave., Colma Creek Bridge at Utah Ave., Grand Ave. and San Bruno Channel over Access Road.

Details
Project Manager Lawrence Henriquez
Funding to Date $760,000.00
Expenditures to Date $532,776.86
Existing / New Project Existing project
Project Category Streets project
City of South San Francisco | FY2023-24 Budget Book Page 337 Capital Cost Breakdown
Capital Cost To Date FY2024 FY2025 FY2026 Total
Design $451,606 $50,000 $501,606
Construction $264,135 $235,000 $235,000 $734,135
Contingency $29,348 $29,348
Total $745,089 $50,000 $235,000 $235,000 $1,265,089
Capital Cost
Total To Date
$745,089
FY2024 Budget
$50,000
Total Budget (all years)
$520K
Project Total
$1.265M
Capital Cost by Year
Construction Design
2024
2025
2026
$50,000.00
$235,000.00
$235,000.00
$0 $60K $120K $180K
Capital Cost for Budgeted Years
TOTAL $520,000.00
Construction (90%) $470,000.00
Design (10%) $50,000.00
City of South San Francisco | FY2023-24 Budget Book Page 338 Funding Sources Breakdown
Funding Sources To Date FY2024 FY2025 FY2026 Total
General Fund $250,000 $250,000
Infrastructure Reserves $380,000 $50,000 $235,000 $235,000 $900,000 Grants $115,089 $115,089
Total $745,089 $50,000 $235,000 $235,000 $1,265,089
Funding Sources
Total To Date
$745,089
FY2024 Budget
$50,000
Total Budget (all years)
$520K
Project Total
$1.265M
Funding Sources by Year
Infrastructure Reserves
2024
2025
2026
$50,000.00
$235,000.00
$235,000.00
$0 $60K $120K $180K
Funding Sources for Budgeted Years
TOTAL $520,000.00
Infrastructure Reserves (100%) $520,000.00
City of South San Francisco | FY2023-24 Budget Book Page 339 st1804 Bridge Preventative Maintenance - Grand
Overview
Request Owner Amanda Parker, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number st1804
Description
This project will conduct preventative maintenance on Grand Avenue overpasses.

Details
Project Manager Matthew Ruble
Funding to Date $0
Expenditures to Date $0
Existing / New Project New project
Project Category Streets project
City of South San Francisco | FY2023-24 Budget Book Page 343 Capital Cost Breakdown
Capital Cost To Date FY2024 Total
Design $172,000 $100,000 $272,000
Total $172,000 $100,000 $272,000
Capital Cost
Total To Date
$172,000
FY2024 Budget
$100,000
Total Budget (all years)
$100K
Project Total
$272K
Capital Cost by Year
Design
2024 $100,000.00
$0 $25K $50K $75K $100K
Capital Cost for Budgeted Years
TOTAL $100,000.00
Design (100%) $100,000.00
City of South San Francisco | FY2023-24 Budget Book Page 344 Funding Sources Breakdown
Funding Sources To Date FY2024 Total
Infrastructure Reserves $172,000 $100,000 $272,000
Total $172,000 $100,000 $272,000
Funding Sources
Total To Date
$172,000
FY2024 Budget
$100,000
Total Budget (all years)
$100K
Project Total
$272K
Funding Sources by Year
Infrastructure Reserves
2024 $100,000.00
$0 $25K $50K $75K $100K
Funding Sources for Budgeted Years
TOTAL $100,000.00
Infrastructure Reserves (100%) $100,000.00
City of South San Francisco | FY2023-24 Budget Book Page 345 st2401 Complete Streets Improvements
Overview
Request Owner Marissa Garren, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number st2401
Description
Design & construct pedestrian and storm drain improvements at Elm Ct, Hillside Blvd, Park Way and Ponderosa Rd.

Details
Project Manager Angel Torres
Funding to Date $0
Expenditures to Date $0
Existing / New Project New project
Project Category Streets project
City of South San Francisco | FY2023-24 Budget Book Page 418 Capital Cost Breakdown
Capital Cost FY2024 Total
Preliminary Study $250,000 $250,000
Design $250,000 $250,000
Construction $500,000 $500,000
Total $1,000,000 $1,000,000
Capital Cost
FY2024 Budget
$1,000,000
Total Budget (all years)
$1M
Project Total
$1M
Capital Cost by Year
Construction Design
Preliminary Study
2024 $1,000,000.00
$0 $250K $500K $750K $1M
Capital Cost for Budgeted Years
TOTAL $1,000,000.00
Construction (50%) $500,000.00
Design (25%) $250,000.00
Preliminary Study (25%) $250,000.00
City of South San Francisco | FY2023-24 Budget Book Page 419 Funding Sources Breakdown
Funding Sources FY2024 Total
Citywide Traffic Impact Fee $1,000,000 $1,000,000
Total $1,000,000 $1,000,000
Funding Sources
FY2024 Budget
$1,000,000
Total Budget (all years)
$1M
Project Total
$1M
Funding Sources by Year
Citywide Traffic Impact Fee
2024 $1,000,000.00
$0 $250K $500K $750K $1M
Funding Sources for Budgeted Years
TOTAL $1,000,000.00
Citywide Traffic Impact Fee (100%)$1,000,000.

City of South San Francisco | FY2023-24 Budget Book Page 420 st2402 2024 Street Surface Seal project
Overview
Request Owner Marissa Garren, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number st2402
Description
Design & construct street surface seal project as part of the Pavement Management Program (PMP) that will cycle through Zones 1 - 5, one zone each year providing a new surface seal of streets with new thermoplastic striping, legends and crosswalks.

Details
Project Manager Angel Torres
Funding to Date $0
Expenditures to Date $0
Existing / New Project New project
Project Category Streets project
City of South San Francisco | FY2023-24 Budget Book Page 421 Capital Cost Breakdown
Capital Cost FY2024 FY2025 FY2026 FY2027 Total
Preliminary Study $1,000,000 $1,000,000
Design $1,000,000 $1,000,000
Construction $1,500,000 $3,500,000 $3,500,000 $3,500,000 $12,000,000 Total $3,500,000 $3,500,000 $3,500,000 $3,500,000 $14,000,000 Capital Cost
FY2024 Budget
$3,500,000
Total Budget (all years)
$14M
Project Total
$14M
Capital Cost by Year
Construction Design
Preliminary Study
2024
2025
2026
2027
$3,500,000.00
$3,500,000.00
$3,500,000.00
$3,500,000.00
$0 $1M $2M $3M
Capital Cost for Budgeted Years
TOTAL $14,000,000.00
Construction (86%) $12,000,000.00
Design (7%) $1,000,000.00
Preliminary Study (7%) $1,000,000.00
City of South San Francisco | FY2023-24 Budget Book Page 422 Funding Sources Breakdown
Funding Sources FY2024 FY2025 FY2026 FY2027 Total
Measure A $1,500,000 $1,500,000 $1,500,000 $1,500,000 $6,000,000 Road Maintenance Acct (SB1) $1,500,000 $1,500,000 $1,500,000 $1,500,000 $6,000,000 SMC Measure W $500,000 $500,000 $500,000 $500,000 $2,000,000 Total $3,500,000 $3,500,000 $3,500,000 $3,500,000 $14,000,000 Funding Sources
FY2024 Budget
$3,500,000
Total Budget (all years)
$14M
Project Total
$14M
Funding Sources by Year
Measure A Road Maintenance Acct (SB1)
SMC Measure W
2024
2025
2026
2027
$3,500,000.00
$3,500,000.00
$3,500,000.00
$3,500,000.00
$0 $1M $2M $3M
Funding Sources for Budgeted Years
TOTAL $14,000,000.00
Measure A (43%) $6,000,000.00
Road Maintenance Acct (SB1) (43%)$6,000,000
SMC Measure W (14%) $2,000,000.00
City of South San Francisco | FY2023-24 Budget Book Page 423 tr2301 Miscellaneous Traffic Improvements
Overview
Request Owner Marissa Garren, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number tr2301
Description
Design & construct any traffic related improvements in the City, such as striping, signs, and other traffic calming measures from the Traffic Advisory Committee, Neighborhood meetings or as needed.

Details
Project Manager Jeffrey Chou
Funding to Date $380,000.00
Expenditures to Date $201,857.00
Existing / New Project Existing project
Project Category Traffic project
City of South San Francisco | FY2023-24 Budget Book Page 499 Capital Cost Breakdown
Capital Cost To Date FY2024 FY2025 FY2026 FY2027 FY2028 Total Preliminary Study $104,037 $104,037
Design $97,820 $150,000 $247,820
Construction $150,000 $150,000 $150,000 $150,000 $150,000 $750,000 Contingency $50,000 $50,000 $50,000 $50,000 $200,000
Total $201,857 $300,000 $200,000 $200,000 $200,000 $200,000 $1,301,857 Capital Cost
Total To Date
$201,857
FY2024 Budget
$300,000
Total Budget (all years)
$1.1M
Project Total
$1.302M
Capital Cost by Year
Construction Contingency
Design
2024
2025
2026
2027
2028
$300,000.00
$200,000.00
$200,000.00
$200,000.00
$200,000.00
$0 $80K $160K $240K
Capital Cost for Budgeted Years
TOTAL $1,100,000.00
Construction (68%) $750,000.00
Contingency (18%) $200,000.00
Design (14%) $150,000.00
City of South San Francisco | FY2023-24 Budget Book Page 500 Funding Sources Breakdown
Funding Sources To Date FY2024 FY2025 FY2026 FY2027 FY2028 Total Infrastructure Reserves $380,000 $380,000
Citywide Traffic Impact Fee $300,000 $200,000 $200,000 $200,000 $200,000 $1,100,000 Total $380,000 $300,000 $200,000 $200,000 $200,000 $200,000 $1,480,000 Funding Sources
Total To Date
$380,000
FY2024 Budget
$300,000
Total Budget (all years)
$1.1M
Project Total
$1.48M
Funding Sources by Year
Citywide Traffic Impact Fee
2024
2025
2026
2027
2028
$300,000.00
$200,000.00
$200,000.00
$200,000.00
$200,000.00
$0 $80K $160K $240K
Funding Sources for Budgeted Years
TOTAL $1,100,000.00
Citywide Traffic Impact Fee (100%)$1,100,000.0
City of South San Francisco | FY2023-24 Budget Book Page 501 tr2401 Airport Boulevard Bike/Ped Gap Closure Study
Overview
Request Owner Marissa Garren, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number tr2401
Description
Support for feasibility studies as needed to complete bike/ped network, and support for grant applications.

Details
Project Manager Christopher Espiritu
Funding to Date $0
Expenditures to Date $0
Existing / New Project New project
Project Category Traffic project
City of South San Francisco | FY2023-24 Budget Book Page 505 Capital Cost Breakdown
Capital Cost FY2024 Total
Preliminary Study $300,000 $300,000
Total $300,000 $300,000
Capital Cost
FY2024 Budget
$300,000
Total Budget (all years)
$300K
Project Total
$300K
Capital Cost by Year
Preliminary Study
2024 $300,000.00
$0 $80K $160K $240K
Capital Cost for Budgeted Years
TOTAL $300,000.00
Preliminary Study (100%) $300,000.00
City of South San Francisco | FY2023-24 Budget Book Page 506 Funding Sources Breakdown
Funding Sources FY2024 Total
Citywide Traffic Impact Fee $300,000 $300,000
Total $300,000 $300,000
Funding Sources
FY2024 Budget
$300,000
Total Budget (all years)
$300K
Project Total
$300K
Funding Sources by Year
Citywide Traffic Impact Fee
2024 $300,000.00
$0 $80K $160K $240K
Funding Sources for Budgeted Years
TOTAL $300,000.00
Citywide Traffic Impact Fee (100%)$300,000.0
City of South San Francisco | FY2023-24 Budget Book Page 507 tr2402 El Camino Real Bik/Ped Improvements
Overview
Request Owner Marissa Garren, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number tr2402
Description
Support for studies to implement Active South City recommendations on El Camino Real and connections to Centennail Trail.

Details
Project Manager Christopher Espiritu
Funding to Date $0
Expenditures to Date $0
Existing / New Project New project
Project Category Traffic project
City of South San Francisco | FY2023-24 Budget Book Page 508 Capital Cost Breakdown
Capital Cost FY2024 Total
Preliminary Study $300,000 $300,000
Total $300,000 $300,000
Capital Cost
FY2024 Budget
$300,000
Total Budget (all years)
$300K
Project Total
$300K
Capital Cost by Year
Preliminary Study
2024 $300,000.00
$0 $80K $160K $240K
Capital Cost for Budgeted Years
TOTAL $300,000.00
Preliminary Study (100%) $300,000.00
City of South San Francisco | FY2023-24 Budget Book Page 509 Funding Sources Breakdown
Funding Sources FY2024 Total
Citywide Traffic Impact Fee $300,000 $300,000
Total $300,000 $300,000
Funding Sources
FY2024 Budget
$300,000
Total Budget (all years)
$300K
Project Total
$300K
Funding Sources by Year
Citywide Traffic Impact Fee
2024 $300,000.00
$0 $80K $160K $240K
Funding Sources for Budgeted Years
TOTAL $300,000.00
Citywide Traffic Impact Fee (100%)$300,000.0
City of South San Francisco | FY2023-24 Budget Book Page 510 tr2403 Traffic Signal Safety Improvements Project
Overview
Request Owner Marissa Garren, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number tr2403
Description
Design & Construct new traffic signals at the intersection of Junipero Serra Blvd/Arroyo; Signal improvements/modifications at the intersections of Grand Ave/Spruce Ave, Grand Ave/Maple, Grand Ave/Linden Ave; and install retroreflective backplates at all traffic signals.

Details
Project Manager Jeffrey Chou
Funding to Date $0
Expenditures to Date $0
Existing / New Project New project
Project Category Traffic project
City of South San Francisco | FY2023-24 Budget Book Page 511 Capital Cost Breakdown
Capital Cost FY2024 Total
Design $500,000 $500,000
Total $500,000 $500,000
Capital Cost
FY2024 Budget
$500,000
Total Budget (all years)
$500K
Project Total
$500K
Capital Cost by Year
Design
2024 $500,000.00
$0 $120K $240K $360K $480K
Capital Cost for Budgeted Years
TOTAL $500,000.00
Design (100%) $500,000.00
City of South San Francisco | FY2023-24 Budget Book Page 512 Funding Sources Breakdown
Funding Sources FY2024 Total
Citywide Traffic Impact Fee $500,000 $500,000
Total $500,000 $500,000
Funding Sources
FY2024 Budget
$500,000
Total Budget (all years)
$500K
Project Total
$500K
Funding Sources by Year
Citywide Traffic Impact Fee
2024 $500,000.00
$0 $120K $240K $360K $480K
Funding Sources for Budgeted Years
TOTAL $500,000.00
Citywide Traffic Impact Fee (100%)$500,000.0
City of South San Francisco | FY2023-24 Budget Book Page 513 tr2404 Chestnut Ave & Commercial Ave Intersection Improvement Project
Overview
Request Owner Marissa Garren, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number tr2404
Description
Design & construct new traffic signals at the intersections to improve pedestrian safety. The improvements include the removal of the “slip lane” and concrete island at the southeast corner that currently provides a free right turn movement, which will increase pedestrian safety by requiring a “stop-on- red” before allowing vehicles to turn right and reducing pedestrian crossing distances with new sidewalk and curb extension at the southeast corner. Other improvements and pedestrian enhancements include new ADA curb ramps and highvisibility crosswalks.

Details
Project Manager Jeffrey Chou
Funding to Date $0
Expenditures to Date $0
Existing / New Project New project
Project Category Traffic project
City of South San Francisco | FY2023-24 Budget Book Page 514 Capital Cost Breakdown
Capital Cost FY2024 Total
Design $300,000 $300,000
Total $300,000 $300,000
Capital Cost
FY2024 Budget
$300,000
Total Budget (all years)
$300K
Project Total
$300K
Capital Cost by Year
Design
2024 $300,000.00
$0 $80K $160K $240K
Capital Cost for Budgeted Years
TOTAL $300,000.00
Design (100%) $300,000.00
City of South San Francisco | FY2023-24 Budget Book Page 515 Funding Sources Breakdown
Funding Sources FY2024 Total
Citywide Traffic Impact Fee $300,000 $300,000
Total $300,000 $300,000
Funding Sources
FY2024 Budget
$300,000
Total Budget (all years)
$300K
Project Total
$300K
Funding Sources by Year
Citywide Traffic Impact Fee
2024 $300,000.00
$0 $80K $160K $240K
Funding Sources for Budgeted Years
TOTAL $300,000.00
Citywide Traffic Impact Fee (100%)$300,000.0
City of South San Francisco | FY2023-24 Budget Book Page 516 tr2405 Citywide School Traffic Calming Improvement Project Overview
Request Owner Marissa Garren, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number tr2405
Description
Design & construct traffic calming improvements at grades Kindergarten through 12 schools, including 15mph speed reduction.

Details
Project Manager Jeffrey Chou
Funding to Date $0
Expenditures to Date $0
Existing / New Project New project
Project Category Traffic project
City of South San Francisco | FY2023-24 Budget Book Page 517 Capital Cost Breakdown
Capital Cost FY2024 Total
Design $300,000 $300,000
Construction $300,000 $300,000
Total $600,000 $600,000
Capital Cost
FY2024 Budget
$600,000
Total Budget (all years)
$600K
Project Total
$600K
Capital Cost by Year
Construction Design
2024 $600,000.00
$0 $150K $300K $450K $600K
Capital Cost for Budgeted Years
TOTAL $600,000.00
Construction (50%) $300,000.00
Design (50%) $300,000.00
City of South San Francisco | FY2023-24 Budget Book Page 518 Funding Sources Breakdown
Funding Sources FY2024 Total
Citywide Traffic Impact Fee $600,000 $600,000
Total $600,000 $600,000
Funding Sources
FY2024 Budget
$600,000
Total Budget (all years)
$600K
Project Total
$600K
Funding Sources by Year
Citywide Traffic Impact Fee
2024 $600,000.00
$0 $150K $300K $450K $600K
Funding Sources for Budgeted Years
TOTAL $600,000.00
Citywide Traffic Impact Fee (100%)$600,000.0
City of South San Francisco | FY2023-24 Budget Book Page 519 tr2406 Traffic Studies and Grant Support
Overview
Request Owner Amanda Parker, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number tr2406
Description
Support for any traffic-related studies from the Traffic Advisory Committee, Neighborhood meetings or as needed, and support for grant applications as needed.

Details
Project Manager Jeffrey Chou
Funding to Date $0
Expenditures to Date $0
Existing / New Project New project
Project Category Traffic project
City of South San Francisco | FY2023-24 Budget Book Page 520 Capital Cost Breakdown
Capital Cost FY2024 FY2025 FY2026 FY2027 FY2028 Total
Preliminary Study $300,000 $200,000 $200,000 $200,000 $200,000 $1,100,000 Total $300,000 $200,000 $200,000 $200,000 $200,000 $1,100,000 Capital Cost
FY2024 Budget
$300,000
Total Budget (all years)
$1.1M
Project Total
$1.1M
Capital Cost by Year
Preliminary Study
2024
2025
2026
2027
2028
$300,000.00
$200,000.00
$200,000.00
$200,000.00
$200,000.00
$0 $80K $160K $240K
Capital Cost for Budgeted Years
TOTAL $1,100,000.00
Preliminary Study (100%) $1,100,000.00
City of South San Francisco | FY2023-24 Budget Book Page 521 Funding Sources Breakdown
Funding Sources FY2024 FY2025 FY2026 FY2027 FY2028 Total Citywide Traffic Impact Fee $300,000 $200,000 $200,000 $200,000 $200,000 $1,100,000 Total $300,000 $200,000 $200,000 $200,000 $200,000 $1,100,000 Funding Sources
FY2024 Budget
$300,000
Total Budget (all years)
$1.1M
Project Total
$1.1M
Funding Sources by Year
Citywide Traffic Impact Fee
2024
2025
2026
2027
2028
$300,000.00
$200,000.00
$200,000.00
$200,000.00
$200,000.00
$0 $80K $160K $240K
Funding Sources for Budgeted Years
TOTAL $1,100,000.00
Citywide Traffic Impact Fee (100%)$1,100,000.0
City of South San Francisco | FY2023-24 Budget Book Page 522 tr2407 Bay Trail - Centennial Way Trail Gap Closure
Overview
Request Owner Amanda Parker, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number tr2407
Description
A feasibility study to create a Class I trail connecting the Centennial Way Trail and Bay Trail. The project seeks to link the City’s two largest multi-use trails, enable a low-stress bikeway connection to the waterfront, and enhance first/last mile connectivity to the San Bruno BART Station for existing and planned employment hubs.

Details
Project Manager Matthew Ruble
Funding to Date $0
Expenditures to Date $0
Existing / New Project New project
Project Category Traffic project
City of South San Francisco | FY2023-24 Budget Book Page 523 Capital Cost Breakdown
Capital Cost FY2024 Total
Preliminary Study $100,000 $100,000
Total $100,000 $100,000
Capital Cost
FY2024 Budget
$100,000
Total Budget (all years)
$100K
Project Total
$100K
Capital Cost by Year
Preliminary Study
2024 $100,000.00
$0 $25K $50K $75K $100K
Capital Cost for Budgeted Years
TOTAL $100,000.00
Preliminary Study (100%) $100,000.00
City of South San Francisco | FY2023-24 Budget Book Page 524 Funding Sources Breakdown
Funding Sources FY2024 Total
Citywide Traffic Impact Fee $100,000 $100,000
Total $100,000 $100,000
Funding Sources
FY2024 Budget
$100,000
Total Budget (all years)
$100K
Project Total
$100K
Funding Sources by Year
Citywide Traffic Impact Fee
2024 $100,000.00
$0 $25K $50K $75K $100K
Funding Sources for Budgeted Years
TOTAL $100,000.00
Citywide Traffic Impact Fee (100%)$100,000.00
City of South San Francisco | FY2023-24 Budget Book Page 525 tr2408 Signalized Intersection Battery Back up Citywide Overview
Request Owner Amanda Parker, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number tr2408
Description
Upgrade signalized intersection Citywide with Battery Backup Systems. Approximately 50 intersections in the City are without BBS.

Details
Project Manager Matthew Ruble
Funding to Date $0
Expenditures to Date $0
Existing / New Project New project
Project Category Traffic project
City of South San Francisco | FY2023-24 Budget Book Page 526 Capital Cost Breakdown
Capital Cost FY2024 Total
Preliminary Study $500,000 $500,000
Design $500,000 $500,000
Construction $1,000,000 $1,000,000
Total $2,000,000 $2,000,000
Capital Cost
FY2024 Budget
$2,000,000
Total Budget (all years)
$2M
Project Total
$2M
Capital Cost by Year
Construction Design
Preliminary Study
2024 $2,000,000.00
$0 $500K $1M $1.5M $2M
Capital Cost for Budgeted Years
TOTAL $2,000,000.00
Construction (50%) $1,000,000.00
Design (25%) $500,000.00
Preliminary Study (25%) $500,000.00
City of South San Francisco | FY2023-24 Budget Book Page 527 Funding Sources Breakdown
Funding Sources FY2024 Total
Citywide Traffic Impact Fee $2,000,000 $2,000,000
Total $2,000,000 $2,000,000
Funding Sources
FY2024 Budget
$2,000,000
Total Budget (all years)
$2M
Project Total
$2M
Funding Sources by Year
Citywide Traffic Impact Fee
2024 $2,000,000.00
$0 $500K $1M $1.5M $2M
Funding Sources for Budgeted Years
TOTAL $2,000,000.00
Citywide Traffic Impact Fee (100%)$2,000,000
City of South San Francisco | FY2023-24 Budget Book Page 528 tr2409 Oyster Point Blvd - Corridor Study to support Bike/Ped and Complete Streets
Overview
Request Owner Amanda Parker, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number tr2409
Description
Support for feasibility studies as needed to complete bike/ped network, transit, and support for grant applications.

Details
Project Manager Matthew Ruble
Funding to Date $0
Expenditures to Date $0
Existing / New Project New project
Project Category Traffic project
City of South San Francisco | FY2023-24 Budget Book Page 529 Capital Cost Breakdown
Capital Cost FY2024 Total
Preliminary Study $100,000 $100,000
Total $100,000 $100,000
Capital Cost
FY2024 Budget
$100,000
Total Budget (all years)
$100K
Project Total
$100K
Capital Cost by Year
Preliminary Study
2024 $100,000.00
$0 $25K $50K $75K $100K
Capital Cost for Budgeted Years
TOTAL $100,000.00
Preliminary Study (100%) $100,000.00
City of South San Francisco | FY2023-24 Budget Book Page 530 Funding Sources Breakdown
Funding Sources FY2024 Total
Citywide Traffic Impact Fee $100,000 $100,000
Total $100,000 $100,000
Funding Sources
FY2024 Budget
$100,000
Total Budget (all years)
$100K
Project Total
$100K
Funding Sources by Year
Citywide Traffic Impact Fee
2024 $100,000.00
$0 $25K $50K $75K $100K
Funding Sources for Budgeted Years
TOTAL $100,000.00
Citywide Traffic Impact Fee (100%)$100,000.00
City of South San Francisco | FY2023-24 Budget Book Page 531 tr2410 Spruce Avenue - Corridor Study to support Bike/Ped and Complete Streets
Overview
Request Owner Amanda Parker, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number tr2410
Description
Support for feasibility studies as needed to complete bike/ped network, transit, and support for grant applications.

Details
Project Manager Matthew Ruble
Funding to Date $0
Expenditures to Date $0
Existing / New Project New project
Project Category Traffic project
City of South San Francisco | FY2023-24 Budget Book Page 532 Capital Cost Breakdown
Capital Cost FY2024 Total
Preliminary Study $100,000 $100,000
Total $100,000 $100,000
Capital Cost
FY2024 Budget
$100,000
Total Budget (all years)
$100K
Project Total
$100K
Capital Cost by Year
Preliminary Study
2024 $100,000.00
$0 $25K $50K $75K $100K
Capital Cost for Budgeted Years
TOTAL $100,000.00
Preliminary Study (100%) $100,000.00
City of South San Francisco | FY2023-24 Budget Book Page 533 Funding Sources Breakdown
Funding Sources FY2024 Total
Citywide Traffic Impact Fee $100,000 $100,000
Total $100,000 $100,000
Funding Sources
FY2024 Budget
$100,000
Total Budget (all years)
$100K
Project Total
$100K
Funding Sources by Year
Citywide Traffic Impact Fee
2024 $100,000.00
$0 $25K $50K $75K $100K
Funding Sources for Budgeted Years
TOTAL $100,000.00
Citywide Traffic Impact Fee (100%)$100,000.00
City of South San Francisco | FY2023-24 Budget Book Page 534 tr2411 Gateway Boulevard - Corridor Study to support Bike/Ped and Complete Streets
Overview
Request Owner Amanda Parker, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number tr2411
Description
Support for feasibility studies as needed to complete bike/ped network, transit, and support for grant applications.

Details
Project Manager Matthew Ruble
Funding to Date $0
Expenditures to Date $0
Existing / New Project New project
Project Category Traffic project
City of South San Francisco | FY2023-24 Budget Book Page 535 Capital Cost Breakdown
Capital Cost FY2024 Total
Preliminary Study $100,000 $100,000
Total $100,000 $100,000
Capital Cost
FY2024 Budget
$100,000
Total Budget (all years)
$100K
Project Total
$100K
Capital Cost by Year
Preliminary Study
2024 $100,000.00
$0 $25K $50K $75K $100K
Capital Cost for Budgeted Years
TOTAL $100,000.00
Preliminary Study (100%) $100,000.00
City of South San Francisco | FY2023-24 Budget Book Page 536 Funding Sources Breakdown
Funding Sources FY2024 Total
Citywide Traffic Impact Fee $100,000 $100,000
Total $100,000 $100,000
Funding Sources
FY2024 Budget
$100,000
Total Budget (all years)
$100K
Project Total
$100K
Funding Sources by Year
Citywide Traffic Impact Fee
2024 $100,000.00
$0 $25K $50K $75K $100K
Funding Sources for Budgeted Years
TOTAL $100,000.00
Citywide Traffic Impact Fee (100%)$100,000.00
City of South San Francisco | FY2023-24 Budget Book Page 537 tr2412 Forbes Boulevard - Corridor Study to support Bike/Ped and Complete Streets
Overview
Request Owner Amanda Parker, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number tr2412
Description
Support for feasibility studies as needed to complete bike/ped network, transit, and support for grant applications.

Details
Project Manager Matthew Ruble
Funding to Date $0
Expenditures to Date $0
Existing / New Project New project
Project Category Traffic project
City of South San Francisco | FY2023-24 Budget Book Page 538 Capital Cost Breakdown
Capital Cost FY2024 Total
Preliminary Study $100,000 $100,000
Total $100,000 $100,000
Capital Cost
FY2024 Budget
$100,000
Total Budget (all years)
$100K
Project Total
$100K
Capital Cost by Year
Preliminary Study
2024 $100,000.00
$0 $25K $50K $75K $100K
Capital Cost for Budgeted Years
TOTAL $100,000.00
Preliminary Study (100%) $100,000.00
City of South San Francisco | FY2023-24 Budget Book Page 539 Funding Sources Breakdown
Funding Sources FY2024 Total
Citywide Traffic Impact Fee $100,000 $100,000
Total $100,000 $100,000
Funding Sources
FY2024 Budget
$100,000
Total Budget (all years)
$100K
Project Total
$100K
Funding Sources by Year
Citywide Traffic Impact Fee
2024 $100,000.00
$0 $25K $50K $75K $100K
Funding Sources for Budgeted Years
TOTAL $100,000.00
Citywide Traffic Impact Fee (100%)$100,000.00
City of South San Francisco | FY2023-24 Budget Book Page 540 tr2413 El Camino Real at 1st to Centennial Trail Gap Closure Overview
Request Owner Amanda Parker, Management Analyst I
Department Capital Improvement Plan
Type Capital Improvement
Project Number tr2413
Description
Install bike and pedestrian signalized intersection at ECR @ 1st and connect the gap to Centennial Trail at 1st Street to set up for grant funding.

Details
Project Manager Matthew Ruble
Funding to Date $0
Expenditures to Date $0
Existing / New Project New project
Project Category Traffic project
City of South San Francisco | FY2023-24 Budget Book Page 541 Capital Cost Breakdown
Capital Cost FY2024 Total
Preliminary Study $100,000 $100,000
Design $100,000 $100,000
Total $200,000 $200,000
Capital Cost
FY2024 Budget
$200,000
Total Budget (all years)
$200K
Project Total
$200K
Capital Cost by Year
Design Preliminary Study
2024 $200,000.00
$0 $50K $100K $150K $200K
Capital Cost for Budgeted Years
TOTAL $200,000.00
Design (50%) $100,000.00
Preliminary Study (50%) $100,000.00
City of South San Francisco | FY2023-24 Budget Book Page 542 Funding Sources Breakdown
Funding Sources FY2024 Total
Citywide Traffic Impact Fee $200,000 $200,000
Total $200,000 $200,000
Funding Sources
FY2024 Budget
$200,000
Total Budget (all years)
$200K
Project Total
$200K
Funding Sources by Year
Citywide Traffic Impact Fee
2024 $200,000.00
$0 $50K $100K $150K $200K
Funding Sources for Budgeted Years
TOTAL $200,000.00
Citywide Traffic Impact Fee (100%)$200,000.0
City of South San Francisco | FY2023-24 Budget Book Page 543 Glossary
Abatement: A reduction or elimination of a real or personal property tax, motor vehicle excise, a fee, charge, or special assessment imposed by a governmental unit. Granted only on application of the person seeking the abatement and only by the committing governmental unit.

Accounting System: The total structure of records and procedures that identify record, classify, and report information on the financial position and operations of a governmental unit or any of its funds, account groups, and organizational components.

Accrued Interest: The amount of interest that has accumulated on the debt since the date of the last interest payment, and on the sale of a bond, the amount accrued up to but not including the date of delivery (settlement date). (See Interest) Annual Comprehensive Financial Report (ACFR): report produced every year summarizing audited financial information for the City
Amortization: The gradual repayment of an obligation over time and in accordance with a predetermined payment schedule.

Appropriation: A legal authorization from the community's legislative body to expend money and incur obligations for specific public purposes. An appropriation is usually limited in amount and as to the time period within which it may be expended.

Arbitrage: As applied to municipal debt, the investment of tax-exempt bonds or note proceeds in higher yielding, taxable securities. Section 103 of the Internal Revenue Service (IRS) Code restricts this practice and requires (beyond certain limits) that earnings be rebated (paid) to the IRS.

Assessed Valuation: A value assigned to real estate or other property by a government as the basis for levying taxes.

Audit: An examination of a community's financial systems, procedures, and data by a certified public accountant (independent auditor), and a report on the fairness of financial statements and on local compliance with statutes and regulations. The audit serves as a valuable management tool in evaluating the fiscal performance of a community.

Audit Report: Prepared by an independent auditor, an audit report includes: (a) a statement of the scope of the audit; (b) explanatory comments as to application of auditing procedures; (c) findings and opinions. It is almost always accompanied by a management letter which contains supplementary comments and recommendations.

Available Funds: Balances in the various fund types that represent non-recurring revenue sources. As a matter of sound practice, they are frequently appropriated to meet unforeseen expenses, for capital expenditures or other one-time costs.

Balance Sheet: A statement that discloses the assets, liabilities, reserves and equities of a fund or governmental unit at a specified date.

Betterments (Special Assessments): Whenever a specific area of a community receives benefit from a public improvement (e.g., water, sewer, sidewalk, etc.), special property taxes may be assessed to reimburse the governmental entity for all or part of the costs it incurred. Each parcel receiving benefit from the improvement is assessed for its proportionate share of the cost of such improvements. The proportionate share may be paid in full or the property owner may request that the assessors apportion the betterment over 20 years. Over the life of the betterment, one year’s apportionment along with one year’s committed interest computed from October 1 to October 1 is added to the tax bill until the betterment has been paid.

Bond: A means to raise money through the issuance of debt. A bond issuer/borrower promises in writing to repay a specified sum of money, alternately referred to as face value, par value or bond principal, to the buyer of the bond on a specified future date (maturity date), together with periodic interest at a specified rate. The term of a bond is always greater than one year. (See Note)
Bond and Interest Record: (Bond Register) – The permanent and complete record maintained by a treasurer for each bond issue. It shows the amount of interest and principal coming due each date and all other pertinent information concerning the bond issue.

Bonds Authorized and Unissued: Balance of a bond authorization not yet sold. Upon completion or abandonment of a project, any remaining balance of authorized and unissued bonds may not be used for other purposes, but must be rescinded by the community's legislative body to be removed from community's books.

City of South San Francisco | FY2023-24 Budget Book Page 544 Bond Issue: Generally, the sale of a certain number of bonds at one time by a governmental unit.

Bond Rating (Municipal): A credit rating assigned to a municipality to help investors assess the future ability, legal obligation, and willingness of the municipality (bond issuer) to make timely debt service payments. Stated otherwise, a rating helps prospective investors determine the level of risk associated with a given fixed-income investment. Rating agencies, such as Moody's and Standard and Poors, use rating systems, which designate a letter or a combination of letters and numerals where AAA is the highest rating and C1 is a very low rating.

Budget: A plan for allocating resources to support particular services, purposes and functions over a specified period of time. (See Performance Budget, Program Budget)
Capital Assets: All real and tangible property used in the operation of government, which is not easily converted into cash, and has an initial useful live extending beyond a single financial reporting period. Capital assets include land and land improvements; infrastructure such as roads, bridges, water and sewer lines; easements; buildings and building improvements; vehicles, machinery and equipment. Communities typically define capital assets in terms of a minimum useful life and a minimum initial cost. (See Fixed Assets)
Capital Budget: An appropriation or spending plan that uses borrowing or direct outlay for capital or fixed asset improvements. Among other information, a capital budget should identify the method of financing each recommended expenditure, i.e., tax levy or rates, and identify those items that were not recommended. (See Capital Assets, Fixed Assets) Cash: Currency, coin, checks, postal and express money orders and bankers’ drafts on hand or on deposit with an official or agent designated as custodian of cash and bank deposits.

Cash Management: The process of monitoring the ebb and flow of money in an out of municipal accounts to ensure cash availability to pay bills and to facilitate decisions on the need for short- term borrowing and investment of idle cash.

Certificate of Deposit (CD): A bank deposit evidenced by a negotiable or non-negotiable instrument, which provides on its face that the amount of such deposit plus a specified interest payable to a bearer or to any specified person on a certain specified date, at the expiration of a certain specified time, or upon notice in writing.

Classification of Real Property: Assessors are required to classify all real property according to use into one of four classes:
residential, open space, commercial, and industrial. Having classified its real properties, local officials are permitted to determine locally, within limitations established by statute and the Commissioner of Revenue, what percentage of the tax burden is to be borne by each class of real property and by personal property owners.

Collective Bargaining: The process of negotiating workers' wages, hours, benefits, working conditions, etc., between an employer and some or all of its employees, who are represented by a recognized labor union. regarding wages, hours and working conditions.

Consumer Price Index: The statistical measure of changes, if any, in the overall price level of consumer goods and services.

The index is often called the "cost-of-living index."
Cost-Benefit Analysis: A decision-making tool that allows a comparison of options based on the level of benefit derived and the cost to achieve the benefit from different alternatives.

Debt Burden: The amount of debt carried by an issuer usually expressed as a measure of value (i.e., debt as a percentage of assessed value, debt per capita, etc.). Sometimes debt burden refers to debt service costs as a percentage of the total annual budget.

Debt Service: The repayment cost, usually stated in annual terms and based on an amortization schedule, of the principal and interest on any particular bond issue.

Encumbrance: A reservation of funds to cover obligations arising from purchase orders, contracts, or salary commitments that are chargeable to, but not yet paid from, a specific appropriation account.

Enterprise Funds: An enterprise fund is a separate accounting and financial reporting mechanism for municipal services for which a fee is charged in exchange for goods or services. It allows a community to demonstrate to the public the portion of total costs of a service that is recovered through user charges and the portion that is subsidized by the tax levy, if any. With an enterprise fund, all costs of service delivery--direct, indirect, and capital costs—are identified. This allows the community to recover total service costs through user fees if it chooses. Enterprise accounting also enables communities to reserve the City of South San Francisco | FY2023-24 Budget Book Page 545 "surplus" or net assets unrestricted generated by the operation of the enterprise rather than closing it out to the general fund at year-end. Services that may be treated as enterprises include, but are not limited to, water, sewer, hospital, and airport services.

Equalized Valuations (EQVs): The determination of the full and fair cash value of all property in the community that is subject to local taxation.

Estimated Receipts: A term that typically refers to anticipated local revenues often based on the previous year's receipts and represent funding sources necessary to support a community's annual budget. (See Local Receipts) Exemptions: A discharge, established by statute, from the obligation to pay all or a portion of a property tax. The exemption is available to particular categories of property or persons upon the timely submission and approval of an application to the assessors. Properties exempt from taxation include hospitals, schools, houses of worship, and cultural institutions. Persons who may qualify for exemptions include disabled veterans, blind individuals, surviving spouses, and seniors.

Expenditure: An outlay of money made by municipalities to provide the programs and services within their approved budget.

Fiduciary Funds: Repository of money held by a municipality in a trustee capacity or as an agent for individuals, private organizations, other governmental units, and other funds. These include pension (and other employee benefit) trust funds, investment trust funds, private- purpose trust funds, and agency funds.

Fixed Assets: Long-lived, assets such as buildings, equipment and land obtained or controlled as a result of past transactions or circumstances.

Fixed Costs: Costs that are legally or contractually mandated such as retirement, FICA/Social Security, insurance, debt service costs or interest on loans.

Float: The difference between the bank balance for a local government’s account and its book balance at the end of the day.

The primary factor creating float is clearing time on checks and deposits. Delays in receiving deposit and withdrawal information also influence float.

Full Faith and Credit: A pledge of the general taxing powers for the payment of governmental obligations. Bonds carrying such pledges are usually referred to as general obligation or full faith and credit bonds.

Fund: An accounting entity with a self-balancing set of accounts that are segregated for the purpose of carrying on identified activities or attaining certain objectives in accordance with specific regulations, restrictions, or limitations.

Fund Accounting: Organizing financial records into multiple, segregated locations for money. A fund is a distinct entity within the municipal government in which financial resources and activity (assets, liabilities, fund balances, revenues, and expenditures) are accounted for independently in accordance with specific regulations, restrictions or limitations. Examples of funds include the general fund and enterprise funds. Communities whose accounting records are organized according to the Uniform Municipal Accounting System (UMAS) use multiple funds.

GASB 34: A major pronouncement of the Governmental Accounting Standards Board that establishes new criteria on the form and content of governmental financial statements. GASB 34 requires a report on overall financial health, not just on individual funds. It requires more complete information on the cost of delivering value estimates on public infrastructure assets, such as bridges, road, sewers, etc. It also requires the presentation of a narrative statement the government's financial performance, trends and prospects for the future.

GASB 45: This is another Governmental Accounting Standards Board major pronouncement that each public entity account for and report other postemployment benefits in its accounting statements. Through actuarial analysis, municipalities must identify the true costs of the OPEB earned by employees over their estimated years of actual service.

General Fund: The fund used to account for most financial resources and activities governed by the normal appropriation process.

General Obligation Bonds: Bonds issued by a municipality for purposes allowed by statute that are backed by the full faith and credit of its taxing authority.

Governing Body: A board, committee, commission, or other executive or policymaking bodyof a municipality or school district.

City of South San Francisco | FY2023-24 Budget Book Page 546 Indirect Cost: Costs of a service not reflected in the operating budget of the entity providing the service. An example of an indirect cost of providing water service would be the value of time spent by non-water department employees processing water bills. A determination of these costs is necessary to analyze the total cost of service delivery. The matter of indirect costs arises most often in the context of enterprise funds.

Interest: Compensation paid or to be paid for the use of money, including amounts payable at periodic intervals or discounted at the time a loan is made. In the case of municipal bonds, interest payments accrue on a day-to-day basis, but are paid every six months.

Interest Rate: The interest payable, expressed as a percentage of the principal available for use during a specified period of time. It is always expressed in annual terms.

Investments: Securities and real estate held for the production of income in the form of interest, dividends, rentals or lease payments. The term does not include fixed assets used in governmental operations.

Line Item Budget: A budget that separates spending into categories, or greater detail, such as supplies, equipment, maintenance, or salaries, as opposed to a program budget.

Local Aid: Revenue allocated by the state or counties to municipalities and school districts.

Maturity Date: The date that the principal of a bond becomes due and payable in full.

Municipal(s): (As used in the bond trade) "Municipal" refers to any state or subordinate governmental unit. "Municipals" (i.e., municipal bonds) include not only the bonds of all political subdivisions, such as cities, towns, school districts, special districts, counties but also bonds of the state and agencies of the state.

Note: A short-term loan, typically with a maturity date of a year or less.

Objects of Expenditures: A classification of expenditures that is used for coding any department disbursement, such as “personal services,” “expenses,” or “capital outlay.”
Official Statement: A document prepared for potential investors that contains information about a prospective bond or note issue and the issuer. The official statement is typically published with the notice of sale. It is sometimes called an offering circular or prospectus.

Operating Budget: A plan of proposed expenditures for personnel, supplies, and other expenses for the coming fiscal year.

Overlapping Debt: A community's proportionate share of the debt incurred by an overlapping government entity, such as a regional school district, regional transit authority, etc.

Performance Budget: A budget that stresses output both in terms of economy and efficiency.

Principal: The face amount of a bond, exclusive of accrued interest.

Program: A combination of activities to accomplish an end.

Program Budget: A budget that relates expenditures to the programs they fund. The emphasis of a program budget is on output.

Purchased Services: The cost of services that are provided by a vendor.

Refunding of Debt: Transaction where one bond issue is redeemed and replaced by a new bond issue under conditions generally more favorable to the issuer.

Reserve Fund: An amount set aside annually within the budget of a town to provide a funding source for extraordinary or unforeseen expenditures.

Revaluation: The assessors of each community are responsible for developing a reasonable and realistic program to achieve the fair cash valuation of property in accordance with constitutional and statutory requirements. The nature and extent of that program will depend on the assessors’ analysis and consideration of many factors, including, but not limited to, the status of City of South San Francisco | FY2023-24 Budget Book Page 547 the existing valuation system, the results of an in-depth sales ratio study, and the accuracy of existing property record information.

Revenue Anticipation Note (RAN): A short-term loan issued to be paid off by revenues, such as tax collections and state aid.

RANs are full faith and credit obligations.

Revenue Bond: A bond payable from and secured solely by specific revenues and thereby not a full faith and credit obligation.

Revolving Fund: Allows a community to raise revenues from a specific service and use those revenues without appropriation to support the service.

Sale of Real Estate Fund: A fund established to account for the proceeds of the sale of municipal real estate other than proceeds acquired through tax title foreclosure.

Stabilization Fund: A fund designed to accumulate amounts for capital and other future spending purposes, although it may be appropriated for any lawful purpose.

Surplus Revenue: The amount by which cash, accounts receivable, and other assets exceed liabilities and reserves.

Tax Rate: The amount of property tax stated in terms of a unit of the municipal tax base; for example, $14.80 per $1,000 of assessed valuation of taxable real and personal property.

Tax Title Foreclosure: The procedure initiated by a municipality to obtain legal title to real property already in tax title and on which property taxes are overdue.

Trust Fund: In general, a fund for money donated or transferred to a municipality with specific instructions on its use. As custodian of trust funds, the treasurer invests and expends such funds as stipulated by trust agreements, as directed by the commissioners of trust funds or by the community's legislative body. Both principal and interest may be used if the trust is established as an expendable trust. For nonexpendable trust funds, only interest (not principal) may be expended as directed.

Uncollected Funds: Recently deposited checks included in an account’s balance but drawn on other banks and not yet credited by the Federal Reserve Bank or local clearinghouse to the bank cashing the checks. (These funds may not be loaned or used as part of the bank’s reserves and they are not available for disbursement.) Undesignated Fund Balance: Monies in the various government funds as of the end of the fiscal year that are neither encumbered nor reserved, and are therefore available for expenditure once certified as part of free cash.

Unreserved Fund Balance (Surplus Revenue Account): The amount by which cash, accounts receivable, and other assets exceed liabilities and restricted reserves. It is akin to a "stockholders’ equity" account on a corporate balance sheet. It is not, however, available for appropriation in full because a portion of the assets listed as "accounts receivable" may be taxes receivable and uncollected. (See Free Cash)
Valuation (100 Percent): The legal requirement that a community’s assessed value on property must reflect its market, or full and fair cash value.

City of South San Francisco | FY2023-24 Budget Book Page 548

← All documents from this meeting