Attachment 2 - Burke Construction Cost Proposal

South San Francisco City Council
November 8, 2023

Document
Attachment 2 - Burke Construction Cost Proposal
Meeting
November 8, 2023
Body
South San Francisco City Council
Original file
241 KB
Text extracted from the city's file for reading and search. Open the original on ci-ssf-ca.legistar1.com. That file is the official record.

15115 Torrey Pines Circle
Chowchilla, CA 93610
559.201.9335 | burkediversified.com
CSLB No. 1028504 | DIR PWC No. 1000061093
October 22, 2023
City of South San Francisco
Attn: Lawrence Henriquez, P.E.
315 Maple Avenue
South San Francisco, CA 94080
Re: City of South San Francisco Fire Training Tower Maintenance Revised Proposal to Include Additional Work Identified In TJC Technical Memorandum Dear Mr. Henriquez,
Burke Diversified dba Burke Construction Co. is pleased to provide its revised proposal of Two Hundred Twenty Thousand One Hundred Dollars ($220,100.00) to install parts furnished by Fire Facilities as outlined in its proposal dated August 10, 2023. Our proposal specifically includes the following:
- Unload and stage material in advance of installation if necessary. - Collection and disposal of all packaging, crates, etc. from delivered materials.

The scope of work has increased, incorporating recommendations of TJC’s Technical Memorandum including but not necessarily limited to the following:
- Rust removal and painting/spray galvanizing of floor joists and mezzanine framing members per TJC Technical Memorandum.
- Removal and replacement of guardrail end cap assemblies (furnished by Fire Facilities) If you have any questions, please do not hesitate to contact the undersigned at (559) 232-6181.

Sincerely,
Burke Construction Co.

Jason E. Burke
President
Attachment 2
FIRE FACILITIES INC.

PROPOSAL 314 WILBURN ROAD
SUN PRAIRIE, WI 53590-9401
To: From:

Tunde Olayomi and Katie Bipes Steven Harms Date: October 25, 2023 Cummings Group Regional Manager Phone: 1-800-929-3726 or (608) 327-4100 South San Francisco parts for tower repair 303-726-6013 Fax: 1-866-639-7012 or (608) 834-1843 Proposal # 5518 E-mail: [email protected]
Remarks:

This proposal is regarding the price requested for South San Francisco, CA .

The total estimated weight for these materials is 16,902.55 lbs.

The total price for this fire tower or parts, F.O.B. destination is $160,559.00 as described below: * See tax note below Freight: $16,830.00
Freight + Material Price: $177,389.00
Price Includes The Following:

1. (13) new exterior door signs (including attachment hardware).

2. (33) New hold opens for all existing shutters and burn room doors (including attachment hardware).

3. All new exterior pre-hung doors (11 - 3070 and 1 - 6070) (including keyed alike hardware).

4. Replacement bar grating for all existing balconies (4' x 46'-6" long balcony, and [4] 4' x 11' long balconies).

5. (32) Interior & exterior operating lever latches for existing shutters and burn room doors.

6. (30) New spring closures for all existing burn room doors ([2] springs per door) (including attachment hardware).

7. (4) Replacement 3' x 7' Roll-Up Door(s) for elevator shaft (including attachment hardware).

8. Replacement roof paneling for both tower (25 'x 22') and residence (11' x 22') flat roofs (including attachment hardware).

9. (5) Replacement sets of (3) chains (15 chains total) for existing roof railing or parapet openings.

10. New perimeter roof railing for annex including (2) chain gates at sidewalls next to residence.

11. (2) New BTI Fire Training Door(s) - Includes (100) 1800 psi Breaching Pins - to replace existing power jamb doors.

12. (4) New Forged Swivel Rappelling Anchors (Rated for 10,000 lb Ultimate Load And 1,000 lb Working Load)

13. (1) Brass assembly with wheel valve for existing standpipe.

14. Westec insulating system for lining ceiling of 2nd floor BR (11' x 16', w/ bulkheads) w/ (4) wall corner trims & (2) Probes.

15. Westec insulating system for lining the ceiling of 3rd floor burn room (10' x 18') w/ (4) wall corner trims & (2) probes.

16. (13) Replacement burn room louver vents for all existing burn rooms.

17. (8) Quarts (2 gallon total) of classic beige touch up paint for exterior wall / trims.

18. (8) Pints (1 gallon total) of cedar red touch up paint for framed opening trims.

19. (5) New 16 Ga. Galv. Removable Cover With Handles, Hold Down Latches, and Connection Chain for existing roof curbs.

20. (6) New gap rails for interior stair openings.

21. (2) New Scout Temp. Meter(s): Data Logging, Internal Alarms, Relay For Ext. Alarms, Bluetooth Enabled

22. (4) New 100' thermocouple probes for attachment to new pyrometers listed above.

23. Replacement 10' Tall Fire Escape w/ platform (re replace existing).

24. Replacement 3'-0" x 4'-0" shutter for 2nd floor.

25. (9) Replacement End Rail Loops (#EPA-3)
Note: 1. All new railing / bar grate / stairs to be Hot Dipped Galvanized and Meet NFPA 1402/Building Code Requirements

2. Exact dimensions of the room(s) layout will need to be provided if this becomes an order.

3. Existing trims will need to be removed and reused in new roof panel areas.

4. Milcor floor doors were not included in price above.

Westec Burn Room Insulation System (The Industry's Best Includes A 15 Year Limited Warranty With Over 450 Installations Payment is due in full, 30 days from ship date. Prices quoted in U.S. Dollars. Prices include the design, materials, fabrication, and freight only - foundation and erection labor prices only if shown. 3004.eff.0423 Applicable taxes may need to be added based on location. Prices effective 60 days from date of this proposal. 1 of 1 "ASK BEFORE YOU BUY" - THE ONLY MAJOR STEEL FIRE TRAINING TOWER MANUFACTURED IN THE UNITED STATES