Utah Ave Overcrossing
Pro je c t
City Council Meeting
February 28, 2024
Adopted Plans & Policies
Recap: Growth
Exp e c ta tio ns
• The General Plan includes the addition of 43,000
residents and 81,000 jobs by 2040
– 2019: 64,000 people and 57,000 jobs
– 2040: 107,000 people and 138,000 jobs
• Most growth is concentrated in the East of 101 Area
and Lindenville
East of 101 Area
Lindenville
Infrastructure
C o ns tra ints
• Existing street network constrains travel for all users:
– Four streets provide access to the East of 101 Area, with one connection between the East of 101 Area and Lindenville – No comfortable bicycle connections across US-101
– Vulnerability of street network to disruptions (e.g. South Airport Bridge closure in 2018)
• General Plan and Lindenville Specific Plan concluded
that the existing network will not be able to handle
changing needs
– New street connections are needed even after the expansion of transit, active transportation, and TDM
Role of Utah Ave Overcrossing in
C ity’s Future Tra ns p o rta tio n Ne two rk
• Enable new east-west street connection
• Accommodate planned residential and employment growth in the East of 101 Area and Lindenville • Connect Centennial Way Trail and Bay Trail via new east-west Class I/IV bikeway • Divert truck traffic away from existing and planned residential areas • Provide flexibility for emergency vehicle access across US-101 Future East -We s t Stre e t C o nne c tio n
Future street network
with Utah Ave overpass
and South Linden Grade
Separation
Future East -We s t Bike wa y C o nne c tio n
Future bike network with
Utah Ave overpass and
South Linden Grade
Separation
Class I Trail or Class IV
separated bikeway only
Public Outreach Meetings
Feasibility Phase 2018-19
Begin Environmental Phase
2012
Design Phase
2024-25
2017

PROJECT HISTORY
End Environmental Phase
2020-23
Community Outreach
2016
Request for
Pro p o s a ls
Proc urement
Advertised RFP on 9/8/2023
Proposals Due 10/27/2023
AECOM, INC.

Multi-disciplined Global Company
High rate of success for similar projects:

Oakland (29th Ave Overcrossing over I-880), Burlingame
(US 101 Broadway Interchange).

Successfully navigated the project to the
Design Phase
Over 20 Years ranked #1 Transportation Firm by
Engineering News-Record’s annual industry rankings.

Successful working relationships with Caltrans
Funding Sourc e Amount Purpose
CA Transportation
C o m m issio n $5M De sign
SMC TA Hig hwa y
Progra m Gra nt $2.7M De sign
C itywide TI F $300k 10 % Lo c a l
Ma tc h
To ta l - $8M
Budget
3rd Party Cost Estimate: $8.23M
AECOM Proposal: $8M
Thank You