Line
Item Description Est Qty
Unit of
Measure
(UOM)
Unit Cost Total Unit Cost Total
1 Mobilization and Demobilization 1.00 LS $176,200.00 $176,200.00 $300,000.00 $300,000.00 2 Clearing, Grubbing and Environmental Protection 1.00 LS $44,200.00 $44,200.00 $55,000.00 $55,000.00 3 Public Posting and Notification 1.00 LS $30,800.00 $30,800.00 $50,000.00 $50,000.00 4 Traffic Regulation and Construction Area Signs 1.00 LS $176,200.00 $176,200.00 $690,000.00 $690,000.00 5 Changeable Message Signs 10.00 EA $3,500.00 $35,000.00 $5,200.00 $52,000.00 6 City Standard Concrete Curb and Gutter 842.00 LF $115.00 $96,830.00 $175.00 $147,350.00 7 City Standard Concrete Curb and Gutter @ Driveway 50.00 LF $125.00 $6,250.00 $175.00 $8,750.00 8 City Standard Concrete Rolled Curb & Gutter 372.00 LF $150.00 $55,800.00 $175.00 $65,100.00 9 City Standard Concrete Valley Gutter 384.00 SF $50.00 $19,200.00 $75.00 $28,800.00 10 Concrete Unsuitable Subgrade Over‐Excavation (Revocable Item) 35.36 CY $200.00 $7,071.94 $390.00 $13,790.40 11 Full Depth HMA Base Repair (4‐Inch Depth) 28,424.55 SF $9.00 $255,820.95 $12.50 $355,306.88 12 Full Depth HMA Base Repair (6‐Inch Depth) 2,673.75 SF $11.00 $29,411.25 $18.00 $48,127.50 13 Roadway Unsuitable Subgrade Over‐Excavation (Revocable Item) 240.00 CY $250.00 $60,000.00 $150.00 $36,000.00 14 8‐Inch Deep Lift HMA Plug for Valley Gutter (Revocable Item) 384.00 SF $13.00 $4,992.00 $35.00 $13,440.00 15 HMA Speed Hump (Revocable Item) 1,540.00 SF $15.00 $23,100.00 $34.00 $52,360.00 16 Soil Sampling, Testing, and Disposal Class III Landfill (Revocable Item) 80.00 CY $200.00 $16,000.00 $45.00 $3,600.00 17 Soil Sampling, Testing, and Disposal Class II Landfill (Revocable Item) 40.00 CY $250.00 $10,000.00 $45.00 $1,800.00 18 Crack Sealing 1.00 LS $134,500.00 $134,500.00 $250,000.00 $250,000.00 19 Polymer Modified Type II Slurry Seal 268,970.11 SY $3.50 $941,395.39 $3.62 $973,671.80 20 Polymer Modified Type III Slurry Seal (For Double Slurry Seal) 48,544.00 SY $4.50 $218,448.00 $5.42 $263,108.48 21 Remove Thermoplastic Markings and Striping, Lane Markers, and Concrete Striping 1.00 LS $43,600.00 $43,600.00 $140,000.00 $140,000.00 22 Thermoplastic Traffic Stripe ‐ Detail 1 4,775.00 LF $1.25 $5,968.75 $2.05 $9,788.75 23 Thermoplastic Traffic Stripe ‐ Detail 8 4,355.00 LF $1.25 $5,443.75 $2.05 $8,927.75 24 Thermoplastic Traffic Stripe ‐ Detail 21 8,458.00 LF $2.00 $16,916.00 $4.70 $39,752.60 25 Thermoplastic Traffic Stripe ‐ Detail 22 303.00 LF $2.50 $757.50 $5.00 $1,515.00 26 Thermoplastic Traffic Stripe ‐ Detail 27B 7,042.00 LF $1.50 $10,563.00 $2.35 $16,548.70 27 Thermoplastic Traffic Stripe ‐ Detail 28 733.00 LF $4.50 $3,298.50 $9.40 $6,890.20 28 Thermoplastic Traffic Stripe ‐ Detail 31 2,095.00 LF $3.50 $7,332.50 $8.20 $17,179.00 29 Thermoplastic Traffic Stripe ‐ Detail 38 343.00 LF $2.50 $857.50 $3.80 $1,303.40 30 Thermoplastic Traffic Stripe ‐ Detail 38A 1,278.00 LF $2.00 $2,556.00 $3.50 $4,473.00 31 Thermoplastic 4" Stripe (White, Yellow, or Blue) 158.00 LF $1.25 $197.50 $3.50 $553.00 32 Thermoplastic 8" Stripe (White, Yellow, or Blue) 433.00 LF $2.50 $1,082.50 $5.85 $2,533.05 33 Thermoplastic 6" Stripe (White or Yellow) 76.00 LF $2.00 $152.00 $4.70 $357.20 SSF DPW Engineering Division
Base Bid Schedule
ST2402 ‐ 2024 Street Surface Seal Project and Citywide School Improvements Project $4,512,736.12
Engineers Estimate Pavement Coatings Co.
$3,045,240.53
Attachment 2
Line
Item Description Est Qty
Unit of
Measure
(UOM)
Unit Cost Total Unit Cost Total
SSF DPW Engineering Division
Base Bid Schedule
ST2402 ‐ 2024 Street Surface Seal Project and Citywide School Improvements Project $4,512,736.12
Engineers Estimate Pavement Coatings Co.
$3,045,240.53
34 Thermoplastic Limit Line (White) 1,489.00 LF $4.50 $6,700.50 $14.10 $20,994.90 35 Thermoplastic Basic Crosswalk (White or Yellow) 3,311.00 LF $10.00 $33,110.00 $23.45 $77,642.95 36 Thermoplastic Continental Crosswalk (White or Yellow) 482.00 LF $25.00 $12,050.00 $58.65 $28,269.30 37 Thermoplastic Ladder Crosswalk (White) 0.00 LF $35.00 $0.00 $0.00 $0.00 38 Thermoplastic Pavement Markings (White, Yellow, or Blue) 8,249.00 SF $8.00 $65,992.00 $14.10 $116,310.90 39 Preformed Thermoplastic Sharrow (Green) 96.00 EA $900.00 $86,400.00 $733.40 $70,406.40 40 Paint Curb (Red, Blue, White, or Yellow) 1.00 LS $25,000.00 $25,000.00 $3,755.02 $3,755.02 41 Flexible Roadway Delineators (White or Yellow) 21.00 EA $100.00 $2,100.00 $234.70 $4,928.70 42 Blue Fire Hydrant Pavement Marker 177.00 EA $35.00 $6,195.00 $29.35 $5,194.95 43 Mobilization/Demobilization (10%) 1.00 LS $30,479.00 $30,479.00 $45,000.00 $45,000.00 44 Public Notification & Posting 1.00 LS $2,000.00 $2,000.00 $25,000.00 $25,000.00 45 Temporary Traffic and Pedestrian Control (10%) 1.00 LS $30,479.00 $30,479.00 $45,000.00 $45,000.00 46 Remove Roadside Sign Panel 51.00 EA $130.00 $6,630.00 $76.27 $3,889.77 47 Remove Roadside Sign Post 26.00 EA $170.00 $4,420.00 $146.68 $3,813.68 48 Install Roadside Sign Panel 161.00 EA $150.00 $24,150.00 $176.02 $28,339.22 49 Furnish and Install Roadside Sign Post 140.00 EA $410.00 $57,400.00 $498.71 $69,819.40 50 Relocate Existing Sign on New Post 3.00 EA $130.00 $390.00 $616.06 $1,848.18 51 Remove Pavement Marking by Grinding and Apply Blackened Paint 1,020.00 SF $8.00 $8,160.00 $10.56 $10,771.20 52 Remove Striping by Applying by Grinding and Apply Blackened Paint 2,440.00 LF $8.00 $19,520.00 $7.04 $17,177.60 53 Furnish and Install Thermoplastic High Visibility Yellow Continental Crosswalk (Detail A) 6,140.00 SF $11.00 $67,540.00 $14.08 $86,451.20 54 Furnish and Install Thermoplastic High Visibility Yield (Shark's Teeth) Pavement Marking 120.00 SF $11.00 $1,320.00 $14.08 $1,689.60 55 Furnish and Install Thermoplastic High Visibility Yellow Crosshatch Pavement Marking 700.00 SF $4.00 $2,800.00 $9.39 $6,573.00 56 Furnish and Install Thermoplastic Center Striping Detail 21 100.00 LF $4.00 $400.00 $4.69 $469.00 57 Furnish and Install "STOP" Pavement Marking per 2018 Caltrans Standard Plan A24D 20.00 EA $250.00 $5,000.00 $258.16 $5,163.20 58 Furnish and Install Red Paint on Curb Face 90.00 LF $5.00 $450.00 $7.04 $633.60 59 Furnish and Install Thermoplastic White Edgeline Striping Detail 24 5,510.00 LF $4.00 $22,040.00 $2.35 $12,948.50 60 Furnish and Install White Limit Line Striping (Detail C) 380.00 LF $4.00 $1,520.00 $14.08 $5,350.40 61 Furnish and Install Thermoplastic Green Sharrow Pavement Marking (Detail D) 25.00 EA $250.00 $6,250.00 $850.75 $21,268.75 62 Furnish and Install Crosswalk RRFB System 4.00 EA $19,200.00 $76,800.00 $34,000.00 $136,000.00 Total $3,045,240.53 $4,512,736.12
Attachment 2 - Base Bid Schedule
South San Francisco City Council
May 22, 2024
- Document
- Attachment 2 - Base Bid Schedule
- Meeting
- May 22, 2024
- Body
- South San Francisco City Council
- Original file
- 148 KB
Text extracted from the city's file for reading and search. Open the original on ci-ssf-ca.legistar1.com. That file is the official record.