Cities Index.
Item No. 6 - 2024 Infrastructure Improvement Cal WaterPlan SSF

South San Francisco City Council
September 11, 2024

Document
Item No. 6 - 2024 Infrastructure Improvement Cal WaterPlan SSF
Meeting
September 11, 2024
Body
South San Francisco City Council
Original file
1.9 MB
Text extracted from the city's file for reading and search. Open the original on ci-ssf-ca.legistar1.com. That file is the official record.

California Water Service
Investing in our Communities
Sept. 11, 2024
Cal Water: History, Expertise, Scale
2 • Formed in 1926, nearly 100 years of experience
• Service areas across CA
• Serve more than two million Californians
through almost 500,000 service connections
• More than 80 billion gallons of water annually
3 Beijing New York
6,500+ miles of water main
To
Cal Water: History, Expertise, Scale
Cal Water in South San Francisco
• Part of this community since 1931
• 68 local employees with 599
years of combined professional
experience and 117 professional
certifications
• Population served = more than
64,000 people
• 16,484 service connections
4 Cal Water in South San Francisco
5 • 160 miles of main
• 6 ground water wells
• 13 storage tanks
• 1 groundwater treatment plants
• Approximately 1,500 fire
hydrants
Cal Water in South San Francisco
6 • Local partnership with South San
Francisco Chamber of Commerce
• South San Francisco Chamber of Commerce
Education Foundation Scholarship sponsor
• Annual business awards event sponsor
• Taste of South San Francisco Sponsor
• On the Board of Directors
DRAFT
Infrastructure Improvement Plan
Where each dollar goes
8 Safe, clean, reliable
drinking water = our top priority
• 500,000+ water quality tests in CA per
year
• 12,684 water quality tests here in 2023
• Monitoring for more than 230
substances
• Among the safest water in the nation
• Our customers pay about a penny per
gallon
9 Proactive, Ongoing Maintenance and
Improvements = Safer Communities
• Cal Water invested $1.5 billion statewide in infrastructure from 2013 to 2022 to ensure the continued safety and reliability of water systems – more than any water company in the state
• We invested more than $145 million here in our Bayshore District infrastructure over that same horizon
• We propose to invest an additional $141 million in this next cycle 10 Making Our Communities Safer
Proactive, ongoing maintenance and upgrades, such as:
• Wildfire protection and emergency preparedness (e.g., maintaining fire hydrants and generators)
• Seeking to prevent sinkholes, or hospitals from losing water
• Proactively addressing impacts of climate change (e.g., sustainability, wildfire resilience, flood protection)
11 DRAFT
Preventing Small, Manageable
Problems from Getting Worse
• Maintenance and upgrades prevent bigger, more
expensive problems
• Already delayed some improvements over the last decade to help keep costs affordable and minimize the impact on customers during the pandemic
• Our proposed upgrades now will help keep costs lower in the long run, and help prevent things from becoming
more expensive to fix later
12 DRAFT
13 • Storage tank redesign and tank
improvements
• Automated Metering Infrastructure
• Brackish water study
• Valve and pump replacements
• Proposed 81,000 feet of main
replacement
DRAFT
Investing in Our System
to Provide Safe, Clean Water
Transparent Process
14 • Committed to being transparent with our customers and providing information in real time
• Proposed Infrastructure Improvement Plan (IIP) will affect customer bills, and we are proactive in our communications with customers regarding the IIP and any bill changes
Transparent Process
15 • As submitted, customers will see a +1.4¢
per day increase in 2026
• We’ll also continue to promote our
existing customer bill assistance
programs and conservation programs
Conservation is a way of life
• Rebates
• High-efficiency toilet rebate (Up $50)
• High-efficiency clothes washer rebate (Up to $150)
• Smart irrigation controller rebate (Up to $125)
• High-efficiency sprinkler nozzle rebate (up to $5 per nozzle) • Lawn-to-garden (turf replacement) rebate ($3 per sq ft. up 1,500 sq ft.) • Smart Landscape Tune-up Program (landscape site evaluation) 16 Rate structure
Previous
• Service charge $26.77
• 1-7 CCF per CCF $7.2380
• 8-10 CCF per CCF $9.0458
• >10 CCF per CCF$13.5652
17 Current
• Service charge $29.09
• 1-6 CCF per CCF $3.4509
• 7-9 CCF per CCF $13.7316
• 10-13 CCF per CCF $17.1585
• >13 per CCF $25.7257
Transparent Process
• Rates are set by independent experts every three
years, not by Cal Water
• All proposed infrastructure improvements and
other costs are thoroughly vetted by the California
Public Advocates Office
• The Public Advocate’s mission is to “obtain the
lowest possible rate for service consistent with
reliable and safe service levels”
• And that is our goal, too
18 Here for You
There are multiple ways for Cal Water customers to reach out to us:
• 24/7 emergency support
• At-home service, 5 days per week
• Connect with your local team 7am-7pm by phone
• Calwater.com/IIP for more info on our proposed Infrastructure Improvement Plan
19

← All documents from this meeting