Fire Station 63 Proposed Design
October 29, 2025
City Council Meeting
Community Civic Campus Master Plan (2019)
2 PHASE I
START: Q1 2020
FINISH: Q1 2022
PHASE III
START: TBD
PHASE
II
PHASE II
START: Q1 2021
FINISH: Q4 2023
FIRE STATION 63 (2019)
• Design Development Paused
• Location: 71 Camaritas Ave
• Square Feet: 8,800
• 1 Story
• 3 Apparatus Bay
• Apparatus Support, Living and
Areas, Sleeping Quarters,
Training Facilities
Fire Station 63
3 Community Civic Campus Update
4 FIRE STATION 63
• Opening: Summer 2028
• Total Cost: $37.3M
• Square Feet: 10,150
• Location: 71 Camaritas Ave
• 2 Stories
• 3 Apparatus Bay
• Apparatus Support, Living and
Areas, Sleeping Quarters,
Training Facilities
Measure W - Community Civic Campus Update
5 Fire Station 63
Operational Need for Replacement
• Houses Engine 63 and Rescue
63 (5-6 personnel daily)
• Health and Safety Concerns
addressed with Grant Funding
• Busiest Fire Station in SSF
• Services Central/Westside of SSF
• Supports Stations 61, 64, 65
Current Fire Station 63
7 Fire Station 63 – Coverage Area
8 • Not Designed as a Fire Station
• Limited Apparatus Storage
• “Reverse In” Apparatus Bay
• Building Support Dependent on
the MSB
• Limited Storage Space
• Limited Support Function
Fire Station 63 – Operational Limitations
9 SSFFD Fire Station Size by Assigned Personnel
10 Comparable Fire Station Square Footage
11 • Hardened Structure with Adequate Building
Systems (Emergency Power, Electricity, ETC)
• Drive-Through Apparatus Bays
• Storage Space for Reserve Apparatus (x2)
• Storage for Equipment, Disaster Supplies,
and Surplus Food/Water
• Dedicated In-Station Exercise Area
• Sleeping Quarters – 2 Exits
• Space for Operational Support Functions
(SCBA Refilling)
• Creation of a Decontamination Corridor
• Support for Additional Personnel During
Large-Scale Disasters
Fire Station 63 Replacement – Operational Benefit
12 Site & Floor Plans
Site Plan
14 First Floor Plan
15 Second Floor Plan
16 Renderings
Camaritas Avenue Looking Southeast
18 Camaritas Avenue Looking Southwest
19 Camaritas Avenue Looking Southwest
20 Westborough Boulevard Looking West
21 Westborough Boulevard Looking West
22 Westborough Boulevard Looking North
23 The project is designed to meet
CBC CALGREEN 2025 & Energy Code
• Transit Connectivity
• Electric Vehicle Charging
• Stormwater Management
• Heat Island Reduction
• Light Pollution Reduction
• Electrification of HVAC Systems
Sustainability Features
24 • Water Efficiency
• On Site Power Generation (PV)
and Storage (BESS)
• Visually Comfortable Interior
Environment
• Construction Waste and Air
Quality Management
• Low Emitting Materials
Sustainability Features
25 Thank you!