1:25 CONCEPTUAL - NOT FOR CONSTRUCTION. ADDITIONAL DETAILED ANALYSIS AND ENGINEERING DESIGN REQUIRED. El Camino Real / 1st Street / Southwood Drive Intersection - Proposed Improvements SIGNAL INTERCONNECT TO EL CAMINO
REAL/W ORANGE AVENUE INTERSECTION
INSTALL NEW TRAFFIC SIGNAL SYSTEM AT INTERSECTION
including pedestrian signals, pedestrian push buttons,
video detection, emergency vehicle preemption, signal
controller and electrical service cabinet (not shown)
INSTALL DIRECTIONAL CURBRAMPS (ALL CORNERS)
EL CAMINO REAL
1ST STREET
SOUTHWOOD
DRIVE INSTALL CURB EXTENSION AND NEW SIDEWALKINSTALL FAR-SIDE BUS BULBOUT INSTALL FAR-SIDE BUS BULBOUTRECONSTRUCT MEDIAN (EXISTING
CURB-TO-CURB DISTANCE TO BE MAINTAINED)
RECONSTRUCT MEDIAN (EXISTINGCURB-TO-CURB DISTANCE TO BE MAINTAINED)
SIGNAL INTERCONNECT TO EL CAMINO
REAL/CHESTNUT AVENUE INTERSECTION
INSTALL SIGNAL INTERCONNECTION TONEAREST SIGNALIZED INTERSECTIONS ONEL CAMINO REAL (NORTH AND SOUTH)
INSTALL CURB EXTENSIONAND NEW SIDEWALK