1:25 CONCEPTUAL - NOT FOR CONSTRUCTION. ADDITIONAL DETAILED ANALYSIS AND ENGINEERING DESIGN REQUIRED. El Camino Real / 1st Street / Southwood Drive Intersection - Proposed Improvements SIGNAL INTERCONNECT TO EL CAMINO

REAL/W ORANGE AVENUE INTERSECTION

INSTALL NEW TRAFFIC SIGNAL SYSTEM AT INTERSECTION
including pedestrian signals, pedestrian push buttons,
video detection, emergency vehicle preemption, signal
controller and electrical service cabinet (not shown)

INSTALL DIRECTIONAL CURBRAMPS (ALL CORNERS)

EL CAMINO REAL
1ST STREET

SOUTHWOOD

DRIVE INSTALL CURB EXTENSION AND NEW SIDEWALKINSTALL FAR-SIDE BUS BULBOUT INSTALL FAR-SIDE BUS BULBOUTRECONSTRUCT MEDIAN (EXISTING

CURB-TO-CURB DISTANCE TO BE MAINTAINED)

RECONSTRUCT MEDIAN (EXISTINGCURB-TO-CURB DISTANCE TO BE MAINTAINED)

SIGNAL INTERCONNECT TO EL CAMINO

REAL/CHESTNUT AVENUE INTERSECTION

INSTALL SIGNAL INTERCONNECTION TONEAREST SIGNALIZED INTERSECTIONS ONEL CAMINO REAL (NORTH AND SOUTH)

INSTALL CURB EXTENSIONAND NEW SIDEWALK