W W W W W W W W
W
W
W
W W W W W W W
G
40'
11' 9' 16' 4'
W
W
W W
W
W
G E G
G G G G G G G G G
G
G G G G G G G G G
G
G G G
S S S S S S S W
G G
E E E
E E P/L P/L P/L
G S
SD SD 41 00 40
00 G G G G G G G G G
40 50 P/L P/L P/L P/L
APN: 014-143-020 APN: 014-143-030 APN: 014-143-050
APN: 014-041-160 APN: 014-143-999 APN: 093-331-110
201 W. ORANGE AVE.,
SOUTH SAN FRANCISCO APN: 093-331-090
IIG TO INSTALL BY DIR. BORE 520'
(2) 2" HDPE SDR-11 (MCI),
(2) 2" HDPE SDR-11 (CITY) &
(3) 1.25" HDPE SDR-11 (IIG)
FROM VAULT TO BORE PIT
MIN. DEPTH OF 36"
UNDER SEGMENT
(SAN_BRN-LOOP_UG-03_SSF)
C/L
DWY DWY
DWY
SIDEWALK SIDEWALK SIDEWALK
DRIVEWAY R/W CURB C/L CURB R/W
R/W
C/L
CURB
R/W
R/WCURB C/L CURB R/W
CURB SIDEWALK DWYDWY
DIRT CONC. S/W
GRASS AREA DIRT
POTHOLES
POTHOLE POTHOLE
207 W. ORANGE AVE., SOUTH SAN FRANCISCO
CURB
R/W
R/W
POTHOLE
EXIST. 60" C.S.P.L. NO.3
(S.F.W.D) GAS LATERAL
EXIST. 60" C.S.P.L. NO.2
(S.F.W.D)
6'' VCP SEWER LINE
6'' VCP SEWER
LINE
WATER LINE
GAS LINE
ABND. GAS LINE
POTHOLE
IIG TO INSTALL BY OPEN TRENCH 21'
(2) 2" HDPE SDR-11 (MCI)
(2) 2" HDPE SDR-11 (CITY) &
(3) 1.25" HDPE SDR-11 (IIG)
FROM BOUNDARY LINE TO BORE PIT
MIN. DEPTH OF 36"
UNDER SEGMENT
(SAN_BRN-LOOP_UG-03_SSF) 5'
R200'
POTHOLE
POTHOLES
POTHOLES
9'
3' 10'' VCP
SEWER
LINE
IIG TO INSTALL BY DIR. BORE 77'
(2) 2" HDPE SDR-11 (MCI)
(2) 2" HDPE SDR-11 (CITY) &
(3) 1.25" HDPE SDR-11 (IIG)
FROM BORE PIT TO VAULT
UNDER SEGMENT
(SAN_BRN-LOOP_UG-03_SSF)
7' 5' 5' 22' 2'
CS W2 CS W1 BART STRUCTURE
R6'
R100'
SEE BORE PROFILE "4"
SHEET 10
39 66
39 00 00 50
44 18
00 50 41 37 42 00 42 50 43 00 43 50 44 00 44 50
00 00 42 74
01 00
39 50 39
3739
40 39
49 39
36 41 50
00 55
00 61
41 63
00 00 41 44 41 57 40
57 00 22
VAULT
SUMP PUMP
STRUCTURE
60'
10'
20'
20'
10'
120 W. ORANGE AVE.,
SOUTH SAN FRANCISCO
APN: 014-143-010 20' 36' 6' 68' 6'
SEE DETAIL "1"
SHEET 4
APN: 014-037-080 3'
1' 8' 9'
60'
PROPOSED 2'x5'
BORE PIT
POTHOLES
TIE INTO IIG ROUTE
SEGMENT
(ASBUILT_
SAN-BRN-LOOP
_UG-03_SSF)
3 1041 18
POTHOLES
1 9
R6'
R200'
10' 20' 20' 10'
IIG TO INSTALL BY OPEN TRENCH 102'
(2) 2" HDPE SDR-11 (MCI),
(2) 2" HDPE SDR-11 (CITY) &
(3) 1.25" HDPE SDR-11 (IIG)
FROM STA. 39+49 TO BOUNDARY LINE
UNDER SEGMENT
(SAN_BRN-LOOP_UG-03_SSF)
IIG TO INSTALL BY OPEN TRENCH 81'
(2) 2" HDPE SDR-11 (MCI),
(2) 2" HDPE SDR-11 (CITY) &
(3) 1.25" HDPE SDR-11 (IIG)
FROM BOUNDARY LINE TO BOUNDARY LINE
UNDER SEGMENT
(SAN_BRN-LOOP_UG-03_BART) 3' 3' 4'2'
ALL PROPOSED EXCAVATION WORK WITHIN
2' OF EXISTING SUBSTRUCTURES RUNNING
IN PARALLEL SHALL BE HAND DIG TO AVOID
SUBSTRUCTURE CONFLICTS OR RISK
DAMAGING EXISTING STRUCTURES
90°
90°
SEE DETAIL "2"
SHEET 4
SEE DETAIL "2"
SHEET 4
POTHOLE
PLACE (1) 3'x5' SHARED VAULT
IN SIDEWALK
LAT: 37°39'06.8"N
LONG: 122°25'37.0"W 1
DISCLAIMER NOTE:
CONTRACTOR TO HIRE A PROFESSIONAL
SURVEYOR FOR PURPOSES OF STAKING
AND RIGHT OF WAY VERIFICATION.
39 68
40 32 41 65
(811)
48 HOURS BEFORE YOU DIG
UNDERGROUND SERVICE ALERT
CALL TOLL FREE
DIGALERT
Know what's below.
Call before you dig.
LOCATION:
SHEET
7 OF 10 DESIGN: IC - R.K.C/E.B DATE: 03-12-2025
PLAN REVISIONS
REV. DATE DESCRIPTION BY
1 03-12-2025 SSF COMMENT IIG
R
Intermountain Infrastructure Group
APPLICANT: ALONG W. ORANGE AVENUE FROM
±247' SOUTHWEST OF MEMORIAL
DRIVE TO ±150' NORTHEAST OF N.
CANAL STREET
ENGINEER'S STAMP: N
8 SEE SHEET TO MATCH SURVEY STA. 44+99
PLACE A 12" AWG SOLID (0.0808" DIAMETER)
TRACER WIRE ALONG WITH THE CONDUIT
INSTALLATION TO BE TERMINATED ON AN
ACCEPTABLE TERMINATION BLOCK IN EACH
HANDHOLE/MH LOCATION
CONSTRUCTION NOTE :
NOTE:
EXACT LOCATION OF UTILITY LINES AND THEIR
DEPTHS ARE UNKNOWN. CONSTRUCTION TO
POTHOLE AND VERIFY.
0' 10' 20' 40'
APN: 014-112-040
NOTE:
CONSTRUCTION TO ACCURATELY LOCATE BART
TUNNEL STRUCTURE AND THE EXCAVATION SUPPORT
SYSTEM PRIOR TO DRILLING.
EXIST. (2) CONC. MANHOLES
UNDER SEGMENT
(ASBUILT_SAN-BRN-LOOP
_UG-03_SSF)
BART CIVIL SHALL BE PRESENT
DURING EXCAVATING WITHIN
THE BART TUNNEL LIMITS.
CONSTRUCTION NOTE :