kimley-horn.com 1300 Clay Street, Suite 900, Oakland, CA 94612 510 625 0712 October 14, 2025
Tony Barrera
City of South San Francisco
400 Grand Avenue
South San Francisco, CA 94080
RE: South San Francisco Fiber Network Design – Budget Amendment Request 3 Dear Tony:

The City of South San Francisco began construction would like Kimley-Horn to provide additional Bidding and Construction phase of the South San Francisco Fiber Network Design project . This budget amendment request includes additional budget for Task 4 Design Support during Bidding and Construction for the following tasks:

Amended Scope:

1. Review the draft additional scope of work (PDF markups of K-H plans) for adding conduit and FO cable from Camaritas/Westborough TS to Antoinette/Chestnut TS and to the SSF PD server.

2. Review the draft additional scope of work (PDF markups of K-H plans) for adding conduit and FO cable from SSF Orange Memorial Park Pool to the SSF Corp Yard server.

3. Review the draft cost estimates.

4. Provide missing diagrams for splicing and termination of the new 48- and 12-strand SMFO cables at TS controller cabinets and at servers.

5. Provide a complete set of CCO drawings for each location to solicit a cost proposal from the current contractor (HP Communications, Inc.).

6. Draft and submit request for record drawings from SFPUC for their water lines along Orange Ave and along North Canal St.

7. Draft and submit a “Project Review Application” to SFPUC for the proposed utility work either within their Right-of-Way (RoW) or crossing their existing water transmission lines.

Coordinate Encroachment Permit prior to additional work.

8. Convert Contractor redline drawings (“as-built”) to conform set of plans

Page 2 ends

kimley-horn.com 1300 Clay Street, Suite 900, Oakland, CA 94612 510 625 0712 We have prepared the following estimate and assumptions for your review and consideration.

Task 4 Design Support during Bidding and Construction
Work Items PM PIC/QC Sr Prof
I
Analyst
II
Analyst
I Support Total

4.2 Design Support during Construction 7 1 8 28 12 5 61 Assist in preparing revised drawings/details for
contract change orders 4 --- 4 12 4 2 26
SFPUC Encroachment Permit DRAFT 2 --- 2 8 --- 1 13
Convert the red-lined (as-built) drawings to
conformed set of plans 1 1 2 8 8 2 22

4.3 Design Support during Closeout 2 --- 2 8 --- 2 14
Punch list and Acceptance Testing Support (a) 2 --- 2 8 --- 2 14 Task 4 Total Hours 18 12 76 96 0 25 75
Labor Rate (7/1/24-12/31/25) $310 $310 $240 $185 $165 $125 Task 4 Total Cost $5,580 $3,720 $18,240 $17,760 $0 $3,125 $15,015 Task 4 Budget (Amendment 3) $15,015
(a) attend one meeting and review fiber test results.

Page 3 ends

kimley-horn.com 1300 Clay Street, Suite 900, Oakland, CA 94612 510 625 0712 Budget Amendment Summary
Based on the above scope, Kimley-Horn is requesting a total additional budget ofp $15,015 allocated to Task 4 (Design Support during Bidding and Construction). The revised total contract budget is $255,140. See below for summary of changes cost table.

Task Original
Budget
Revised
Budget
(Design
Changes)
Budget
Amend 1
(12/15/23)
Budget
Amend 2
(3/15/24)
Budget
Amend 3
(10/14/25)
Task 1 – Project
Management $9,810 $9,810 $9.810 $9.810 $9.810.00
Task 2 – Data Collection
and Conceptual Design $26,620 $27,712.50 $27,712.50 $25,712.50 $25,712.50 Task 3 – Prepare PS&E
Documents $84,190 $110,937.50 $124,507.50 $154,352.50 $154,352.50 Task 4 – Design Support
During Bidding and
Construction
$27,840 $ -0- $ -0- $49,050.00 $64,065.00
Other Direct Costs $1,200 $1,200 $1,200 $1,200 $1,200
TOTAL $149,660 $149,660 $165,230 $240,115 $255,140
We appreciate your consideration of the additional budget for completion of the project. Please contact me if you have any questions or need further clarification on our request.

Very truly yours,
KIMLEY-HORN AND ASSOCIATES, INC.

Elbert K. Chang, P.E.

Project Manager
RCE #61548
OTHER:
(Per accident)
(Ea accident)
$
$

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. $
$
$
$ PROPERTY DAMAGE
BODILY INJURY (Per accident)
BODILY INJURY (Per person)

COMBINED SINGLE LIMIT

AUTOS ONLY

AUTOS ONLY AUTOS

NON-OWNED

OWNED SCHEDULED

ANY AUTO
OFFICER/MEMBER EXCLUDED? DESCRIPTION OF OPERATIONS below If yes, describe under ANY PROPRIETOR/PARTNER/EXECUTIVE $
$
$
E.L. DISEASE - POLICY LIMIT
E.L. DISEASE - EA EMPLOYEE
E.L. EACH ACCIDENT EROTH- STATUTE
PER
EACH OCCURRENCE $ AGGREGATE $
$
OCCUR
CLAIMS-MADE DED RETENTION $
PRODUCTS - COMP/OP AGG $ GENERAL AGGREGATE $
PERSONAL & ADV INJURY $
MED EXP (Any one person) $
EACH OCCURRENCE $

DAMAGE TO RENTED
CLAIMS-MADE OCCUR PREMISES (Ea occurrence) $ GEN'L AGGREGATE LIMIT APPLIES PER: POLICY PRO- JECT LOC HIRED

AUTOS ONLY
GL5268169

GL5268169