Initial Study and Mitigated Negative
Declaration for the New Park at
Linden and Pine Project,
South San Francisco, California
NOVEMBER 18, 2025 (FINAL)
PREPARED FOR
City of South San Francisco
PREPARED BY
SWCA Environmental Consultants
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
FOR THE
NEW PARK AT LINDEN AND PINE PROJECT,
SOUTH SAN FRANCISCO, CALIFORNIA
FINAL
Prepared for
City of South San Francisco
400 Grand Avenue
South San Francisco, California 94083
Attn: Phillip Vitale, Jr.
Deputy Director of Capital Projects
Prepared by
SWCA Environmental Consultants
60 Stone Pine Road, Suite 201
Half Moon Bay, California 94019
(650) 440-4160
www.swca.com
SWCA Project No. 94995
November 18, 2025
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
i
CONTENTS
1 Introduction .......................................................................................................................................... 1
1.1 Project Location ........................................................................................................................ 1
1.2 Existing Conditions................................................................................................................... 1 2 Project Description............................................................................................................................... 5
2.1 Proposed Park Design ............................................................................................................... 5
2.2 Park Community Events............................................................................................................ 7
2.3 Site Access, Parking, and Vehicle Circulation.......................................................................... 8
2.4 Landscaping and Lighting ......................................................................................................... 8
2.5 Utilities...................................................................................................................................... 8
2.6 Construction .............................................................................................................................. 9
2.7 Required Discretionary Approvals.......................................................................................... 10 3 Environmental Checklist and Environmental Evaluation.............................................................. 11 I. Aesthetics................................................................................................................................ 12 II. Agriculture and Forestry Resources........................................................................................ 15 III. Air Quality............................................................................................................................... 16 IV. Biological Resources............................................................................................................... 26 V. Cultural Resources .................................................................................................................. 30 VI. Energy ..................................................................................................................................... 33 VII. Geology and Soils ................................................................................................................... 34 VIII. Greenhouse Gas Emissions..................................................................................................... 39 IX. Hazards and Hazardous Materials........................................................................................... 43 X. Hydrology and Water Quality ................................................................................................. 52 XI. Land Use and Planning............................................................................................................ 57 XII. Mineral Resources................................................................................................................... 59 XIII. Noise........................................................................................................................................ 60 XIV. Population and Housing .......................................................................................................... 67 XV. Public Services........................................................................................................................ 68 XVI. Recreation................................................................................................................................ 70 XVII. Transportation ......................................................................................................................... 71 XVIII. Tribal Cultural Resources........................................................................................................ 79 XIX. Utilities and Service Systems.................................................................................................. 81 XX. Wildfire ................................................................................................................................... 88 XXI. Mandatory Findings of Significance ....................................................................................... 90 New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
ii
Appendices
Appendix A. Site Design Plans and Final Concept Plan
A1. Schematic Design with Infrastructure
A2. Design Plan
A3. Site Plan Review for Linden Park in South San Francisco, California (Hexagon Transportation Consultants, Inc. 2025)
A4. Proposed Stormwater Options
Appendix B. Environmental Site Assessments1
B1. Final Phase 1/Phase II Environmental Site Assessment Targeted Brownfields Assessment Report, South San Francisco – Linden & Cypress Avenues, South San Francisco, CA. U.S. EPA Region 9, Resource Conservation and Recovery Act (REPA) Contract No. 68HERH19D0018 (Toeroek Associates, Inc. 2021) B2. Analysis of Brownfields Cleanup Alternatives, South San Francisco – Linden & Cypress Aves, Targeted Brownfields Assessment, RCRA Enforcement, Permitting and Assistance Contract No. 68HERH19D0018, Task Order 68HE0920F0007 (Toeroek Associates and Tetra Tech Inc. 2021)
B3. Supplemental Site Investigation Report, 616 Linden Avenue, Closed LUST Cleanup Site Case No. 550097 (Ninyo & Moore 2023)
B4. Supplemental Site Investigation No. 2 Report, 616 Linden Avenue, Closed LUST Cleanup Site Case No. 550097 (Ninyo & Moore 2024)
B5. Environmental Summary Report, 616 and 700 Linden Avenue, South San Francisco (Ninyo & Moore 2024)
Appendix C. CalEEMod Output Results
Appendix D. Geotechnical Evaluation, Linden Avenue Park, 616 Linden Avenue and 270 Pine Avenue, South San Francisco (Ninyo & Moore 2023)
Appendix E. Transportation Analysis for Linden Park in South San Francisco, California (Hexagon Transportation Consultants, Inc. 2025)
1 All hazardous materials investigations and reports are included without their appendices. The full documents with appendices are available in the administrative record.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
iii
Figures
Figure 1-1. Project Location. ........................................................................................................................ 2 Figure 1-2. Project Vicinity. ......................................................................................................................... 3 Figure 2-1. Project Site Plan. ........................................................................................................................ 6 Figure 3-1. San Francisco International Airport, Airport Influence Areas. ................................................ 51 Tables
Table 3-1. Project Consistency with General Plan Policies........................................................................ 14 Table 3-2. Estimated Average Daily Construction Criteria Air Pollutant Emissions................................. 21 Table 3-3. Estimated Construction Schedule, Equipment and Vehicle Trips............................................. 23 Table 3-4. Unmitigated Operational Emissions Summary ......................................................................... 24 Table 3-5. Estimated Project Annual Construction Greenhouse Gas Emissions........................................ 41 Table 3-6. Estimated Annual Operational Greenhouse Gas Emissions...................................................... 42 Table 3-7. Noise Level Standards............................................................................................................... 61 Table 3-8. Typical Construction Equipment Noise Levels......................................................................... 62 Table 3-9. Trip Generation ......................................................................................................................... 77 Table 3-11. Water Supply and Demand Estimates for Normal Water Years ............................................. 85 Table 3-12. CalWater Water Supply and Demand Estimates for Multiple Dry Years............................... 85 New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
1 1 INTRODUCTION
The City of South San Francisco (City) is proposing the New Park at Linden and Pine Project (project), which includes the redevelopment of two parcels on the east side of Linden Avenue (616 and 700 Linden Avenue) and a section of Pine Avenue that bisects the project site in the city of South San Francisco. The new public park will feature a playground, recreational space, a sports court, potential restrooms, community gathering spaces, and public art.
1.1 Project Location
The city of South San Francisco is located approximately 3 miles north of San Francisco International Airport (SFO) and the city of San Bruno; just south of the city of Daly City, the town of Colma, and San Bruno Mountain; approximately 6 miles east of the city of Pacifica; and west of the waters of San Francisco Bay in San Mateo County (Figure 1-1, Project Location). The project area is located in the Downtown Subarea between Lindenville and Sign Hill in the City of South San Francisco 2040 General Plan (2040 General Plan) and is identified in the Linden Neighborhood Center in the South San Francisco Downtown Station Area Specific Plan.
2,3
The 0.86-acre project site (Assessor’s Parcel Numbers [APNs] 012-174-300 and 012-145-370) is located at 700 Linden Avenue and 616 Linden Avenue and includes an approximately 100-foot section of Pine Avenue that bisects the project site in South San Francisco (Figure 1-2, Project Vicinity). Both parcels are owned by the City. The project site is bounded by Linden Avenue to the west, 8th Lane to the north, 7th Lane to the south, and residences to the east (see Figure 1-2).
1.2 Existing Conditions
The project site currently includes a vacant, grassy lot at 700 Linden Avenue, an active parking lot at 616 Linden Avenue, and a section of Pine Avenue. The parking lot provides customer and employee parking for adjacent businesses and contains 20 metered vehicle parking spaces and one unmetered Americans with Disabilities Act (ADA)-compliant space. Both lots are zoned Parks and Recreation (PR).
Pine Avenue has six unmetered spaces within the project area, and 7th Lane and 8th Lane do not have marked spaces but allow unmetered parking on one side of the street only. Both 7th Lane and 8th Lane are 15 feet wide.
The ground surface across the project site is relatively level, with elevations varying from about 46 to 54 feet above mean sea level. There is an existing overhead powerline with a Pacific Gas and Electric Company (PG&E) joint utility pole on the north side of Pine Avenue. Existing water and sanitary sewer lines are located in Pine Avenue. Existing stormwater infrastructure is located in Linden Avenue (Appendix A1). Previous uses at 616 Linden Avenue included residences and an automotive repair shop that contained underground oil and gas tanks. After the automotive shop closed, the tanks and surrounding contaminated soil were hauled off-site. The groundwater was routinely tested through 2001 until the County of San Mateo (County) confirmed the investigation and remedial action were satisfactorily completed and closed the case (Appendix B5).4 2 City of South San Francisco. 2022a. City of South San Francisco 2040 General Plan. Final Plan. Resolution #178-2022.
Adopted October 12. Available at: https://shapessf.com/. Accessed January 2, 2025. 3 City of South San Francisco. 2015a. South San Francisco Downtown Station Area Specific Plan. Adopted February. Available at: https://shapessf.com/wp-content/uploads/2022/09/Adopted-DSASP-February-20.pdf. Accessed June 2, 2025. 4 Ninyo & Moore. 2023. Technical Memorandum: Remedial Options Evaluation, 616 Linden Avenue, Closed LUST Cleanup Site Case No. 550097. November 16.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
2 Figure 1-1. Project Location.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
3 Figure 1-2. Project Vicinity.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
4 Based on the State’s Low-Threat Underground Storage Tank Case Closure Policy, the soil currently meets the criteria for use as a park, including for direct contact and outdoor air exposure (see Appendix B3).
5 Testing also revealed the presence of a buried concrete structure on the southern edge of the parcel, which was likely a basement-level utility, furnace, or storage room for the former residence.
The soil within the concrete structure has an elevated lead concentration, likely due to pieces of metal in the soil (Appendix B1).6 As part of the project, the City plans to remove lead-contaminated soils within the buried concrete structure, but will leave the concrete structure in place.
Surrounding land uses include single-family residential to the northeast, multi-family and single-family residential to the southeast, and multi-family residential and commercial to the northwest and southwest.
The commercial properties are part of the Linden Neighborhood Center commercial stakeholder group.
The neighborhood, including the Linden Neighborhood Center, is served by the public parking lot and street parking.
The City of South San Francisco Parks and Recreation Master Plan, 7 South San Francisco Downtown
Station Area Specific Plan,
8 and 2040 General Plan9identify the neighborhoods surrounding the project site—the Downtown Subarea and Linden Neighborhood Center—as areas of concern for their lack of parks and open space. Goal 2 of the Parks and Recreation Master Plan is that “every South San Francisco resident should be within a 5-minute walk of a park, trail or open space.” 10 The Parks and Recreation
Master Plan identifies areas that are not within ¼ mile of an existing park or open space area.
The Downtown Neighborhood is an L-shaped area of the city with a roughly north–south arm surrounding Linden Avenue (approximately bounded by Maple Avenue to the west, Airport Boulevard to the east, Armour Avenue to the north, and Railroad Avenue to the south) and a roughly east–west arm surrounding Grand Avenue and Baden Avenue. The portion of the Downtown Neighborhood surrounding Linden Avenue has one mini park (0.3 acre) at the corner of Cypress and Pine Avenues with a children’s play area and basketball courts, approximately 800 feet southwest of the project site. The Sign Hill trailhead in the Sign Hill Neighborhood is approximately 0.25 mile northwest of the project site. Sign Hill is used for passive recreation with hiking trails, but recreation uses are limited by habitat conservation concerns. There are no parks in the neighborhood with facilities for adults or seniors or that support neighborhood gatherings or events. The project site is within ¼ mile of neighborhoods that are not currently within a 5-minute walking distance of parks, including neighborhoods on Hawthorne Place, Maple Avenue, and Spruce Avenue to the northwest and Lux Avenue and Miller Avenue to the south.11 5 Ninyo & Moore. 2023. Technical Memorandum: Remedial Options Evaluation, 616 Linden Avenue, Closed LUST Cleanup Site Case No. 550097. November 16.
6 Toerock Associates. 2021. Final Phase 1/Phase II Environmental Site Assessment Targeted Brownfields Assessment Report, South San Francisco – Linden & Cypress Avenues, South San Francisco, CA. U.S. EPA Region 9, Resource Conservation and Recovery Act (REPA) Contract No. 68HERH19D0018. July 2. 7 City of South San Francisco. 2015b. City of South San Francisco Parks and Recreation Master Plan. Adopted July 22.
Available at: https://www.ssf.net/Departments/Parks-Recreation/About-Us/Parks-and-Recreation-Master-Plan. Accessed June 12, 2025.
8 City of South San Francisco. 2015a. South San Francisco Downtown Station Area Specific Plan. Adopted February. Available at: https://shapessf.com/wp-content/uploads/2022/09/Adopted-DSASP-February-20.pdf. Accessed June 2, 2025. 9 City of South San Francisco. 2022a. City of South San Francisco 2040 General Plan. Final Plan. Resolution #178-2022.
Adopted October 12. Available at: https://shapessf.com/. Accessed January 2, 2025. 10 City of South San Francisco, 2015b.
11 City of South San Francisco, 2015b.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
5 2 PROJECT DESCRIPTION
The proposed project includes demolition of the existing parking lot at 616 Linden Avenue and a section of Pine Avenue and construction of a new neighborhood park. The new park will cover 616 and 700 Linden Avenue and an approximately 100-foot section of Pine Avenue, and will provide a new public space for residents of the neighborhood to gather, connect, and play. The new park would contain a plaza/outdoor event space, lawns, picnic areas, play structures, a fitness area, a potential restroom structure, new parking areas, and new lighting and landscaping (Figure 2-1, Project Site Plan). The park is envisioned and designed as a neighborhood park, with the majority of users walking to the park from nearby residential areas.
2.1 Proposed Park Design
The park would include the following elements (see Figure 2-1; Appendix A2):
• A large, paved plaza/event space with a stage, electricity, and lighting with capacity for 200 people that would either be paved with concrete or underlain with concrete pavers. • One or more art installations, which could include art columns, a ground mural at the plaza, and/or an interactive art installation. The art installations would be decided based on a public art process and designed to reflect the community’s identity and heritage. • Two flexible lawn spaces (1,487.5 square feet and 3,535 square feet, respectively) with a combined capacity for approximately 500 people that could host a variety of activities and provide overflow space during larger events. The lawn areas would have either natural or synthetic turf.
• Small gathering areas, including picnic tables and benches, which would surround each flexible lawn. There would be approximately three tables surrounding the north lawn and two tables and four benches surrounding the south lawn.
• A play area with play structures for ages 2-to-5 and 5-to-12 would be surrounded by a 4-foot-tall fence and include a climbing/sliding structure, group spinner, group swing, tot slide, art feature, and nature play edges (logs and boulders). The play area surfacing would be engineered wood fiber safety surfacing, with a small amount of poured-in-place rubber safety surfacing at the sloped hillside at the tot slide.
• A fitness area that would include outdoor exercise equipment for the public to use. • A potential restroom building, if funds are acquired. • New lighting and landscaping, including approximately 30 to 35 new trees. • Realignment of Pine Avenue as a one-way lane leading to 7th Lane. • Seventeen new parking spaces on Pine Avenue, 7th Lane, and 8th Lane. • A privacy fence on the eastern side between the park and adjacent housing.
The project also involves the demolition of an existing parking lot containing 21 parking spaces, an approximately 100-foot segment of Pine Avenue, and a vacant grassy field along Linden Avenue between 7th Lane and 8th Lane.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
6 Figure 2-1. Project Site Plan.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
7 Voluntary cleanup and removal of lead-contaminated soil in an existing buried concrete structure would be completed as part of the project. The bottom of the concrete structure is approximately 36 inches below ground surface. Removal of the contaminated soil would require excavation to a depth of approximately 36 inches. The concrete structure would be left in place. The project would require grading and excavation for installation of utilities and foundations for park amenities (play structures, lighting, landscaping, etc.), potentially including a restroom building. The maximum depth of excavation for footings for play equipment and lighting would be up to approximately 60 inches below ground surface.
2.2 Park Community Events
The park is planned as a place for neighbors to gather and play and would provide space for both large and small gatherings. The park is expected to host approximately 100 to 250 people on a daily basis, most of whom would walk to the park, in the absence of events. The central plaza would host medium-to-large neighborhood events that could include concerts, dance performances, outdoor exercise classes, and other events. The lawns would provide additional space for participants of concerts and events. The larger lawn to the south of the plaza would provide space for a variety of activities such as casual sports play and movie nights, and the smaller lawn north of the plaza would provide space for picnics or spillover activity from the play and fitness areas.
While the event program for the park has not yet been determined, some potential activities could include:
• Weekly or monthly farmers’ markets, typically on weekends between 9:00 a.m. and 12:00 p.m., with additional time allotted for setup and cleanup. Anticipated attendance would be no more than 150 people at any one point in time during the event. • Concerts or festivals, likely no more than four times per year, that may include road closures surrounding the park, amplified music, food trucks, and vendor booths. These events would typically take place during the day and end before 8:00 p.m., which is the required end time according to the City’s amplified sound ordinance (South San Francisco Municipal Code Section
8.32.080, Amplified Sound—Regulations). Anticipated attendance would be no more than 500 people at any one point in time during the event.
• Movie nights, likely no more than four times per year, and may involve a large inflatable movie screen, amplified noise, and food trucks and/or vendor booths for movie concessions. It is possible that amplified noise could be heard up to 10:00 p.m. as outdoor movies can only be shown after sundown to be visible on the screen. This time surpasses the City’s amplified sound ordinance (Section 8.32.080) and would only take place with City approval as well as a notice to neighbors within 500 feet of the park. Anticipated attendance would average around 300 people. • An informal stage setting, which is an element of the plaza that could be used for various types of performances. These performances could potentially be a part of the events listed above, or standalone, for example, if the City were to invite a limited-term mini-concert series for smallscale performances.
The City’s Special Event Permit process allows for different departments to assess potential impacts of any proposed event to the park and surrounding neighborhood and to ensure compliance with federal, state, and local law.
12 12 City of South San Francisco. 2025. City of South San Francisco Special Event Permit Guidelines. Available at:
https://www.ssf.net/files/assets/public/v/1/police/images/documents/ssf20set20guidelines.pdf. Accessed August 4, 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
8 2.3 Site Access, Parking, and Vehicle Circulation
Park construction would reroute one block of Pine Avenue and convert it to a one-way alley ending at 7th Lane. The project would reduce the existing number of parking spaces from 27 to 17 by removing 21 parking spaces from the existing parking lot and six spaces along Pine Avenue, and constructing 17 new parking spaces, including one new ADA van-accessible space, on Pine Avenue, 7th Lane, and 8th Lane. Diagonal parking would be available on 7th Lane (five spaces) and 8th Lane (seven spaces, including one ADA van-accessible space) and parallel parking would be on the one-way portion of Pine Avenue (five spaces). Parking will have time constraints during weekday daytime hours. The project would also include roadway and sidewalk frontage improvements along Linden Avenue, Pine Avenue, 7th Lane, and 8th Lane. Traffic calming measures, including stop signs, crosswalks, and signage would be added surrounding the park for pedestrian safety. The park would also feature several bicycle racks, addressing the current lack of bicycle parking (Appendix A3).
2.4 Landscaping and Lighting
The project would include the removal of approximately nine existing trees on-site, seven trees adjacent to the parking lot on Linden Avenue, and two trees on Pine Avenue, most of which are in fair to poor condition. Approximately 30 to 35 new trees of a variety of species would be planted throughout the project site along with low-water shrubs and other landscape plants. The City has adopted the State of California Model Water Efficient Landscape Ordinance (WELO) and all qualified projects must comply with the water efficient landscape requirements. Landscaping would include drought-tolerant and native species with new efficient drip irrigation that meets state WELO requirements.13 Three planting areas would be added on-site for stormwater retention and treatment (Appendix A4). The existing draft stormwater retention plan assumes the two lawn areas would have natural turf. If the City chooses to use artificial turf, the stormwater retention plan would be revised to include the additional approximately 5,000 square feet of artificial turf lawn as impervious surface.
New lighting within the park will build upon the existing street lighting along Linden Ave. Existing streetlights, which are a traditional double-acorn design, would be retained and updated with energyefficient bulbs. New streetlights would be a maximum 16 feet in height and would not be as traditional in style but would complement the existing double acorns in color. Sightlines will be maintained between tree canopies and lower ground plane plantings to ensure visibility into the park.
2.5 Utilities
The project would include the replacement and addition of new wastewater, water, and stormwater drainage throughout the project site. A new 4-inch lateral and water meter connected to the water main on Pine Avenue would be installed for potable and irrigation water supply. New storm drains would connect to the bioretention basins on Linden Avenue, and overflow would be routed to existing storm drains in Linden Avenue. A new sanitary sewer line would be constructed, likely 4 or 6 inches in size, and would connect to the existing 6-inch sanitary sewer line located on Pine Avenue.
Two planting areas and Silva cells would be added on-site for stormwater retention and treatment.
Stormwater retention infrastructure would include a combination of below-grade Silva cells, bioretention planters, and/or bioretention areas. These areas would encompass approximately 675 square feet of Low 13 City of South San Francisco. 2025. WELO Landscape Document Package. Available at:
https://www.ssf.net/files/assets/public/v/1/economic-amp-community-development/documents/welo-document-packagejul2.pdf. Accessed July 9, 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
9 Impact Development (LID) treatment areas. Bioretention planters require above-grade space. Silva Cells are underground but more expensive to maintain. Stormwater would be routed through the LID stormwater treatment areas and excess stormwater would be directed to the stormwater system in Linden Avenue (see Appendix A4).
The existing PG&E joint pole and overhead lines on Pine Avenue would be retained. Existing overhead service lines from the joint pole to individual streetlights and one residence will be removed and/or relocated. The park would be designed to accommodate the PG&E joint pole and overhead lines in place.
New electrical lines would connect to the park lighting, stage area, and restroom. No gas infrastructure would be installed.
2.6 Construction
Project construction is expected to begin in March 2026 and occur over a period of approximately 8 to 10 months. Construction is expected to be completed by December 2026. Staging areas would occur on-site.
Additional construction parking would be required and parking spaces may be reserved on Linden Avenue during project construction for construction and worker vehicles. Construction hours would be from 8:00 a.m. to 5:00 p.m., Monday through Friday. Activities may begin as early as 7:00 a.m. on weekdays and occur from 9:00 a.m. to 4:00 p.m. on Saturdays, but such activities would be limited to quiet activities and would not involve engine-driven machinery. Although the City allows construction from 8:00 a.m. to 6:00 p.m. on Saturdays and 10:00 a.m. to 6:00 p.m. on Sundays, weekend construction is not anticipated and would require permission from the City.
Construction activities would include the following elements:
1. The project site would be fenced, prepared, and cleared. The existing parking lot and section of Pine Avenue would be demolished and regraded. Trenching for new utilities would occur.
2. The new park facilities would be constructed, including the new Pine Avenue alignment, hardscape, utilities, sidewalks, and pathways necessary for access.
3. The new park furniture, including play structures, picnic tables and benches, fitness and games equipment, and bicycle racks, would be installed. Traffic calming measures in streets surrounding the park would be constructed, along with street and sidewalk improvements.
4. Construction activities would conclude with landscaping and final site work, including storm drainage, irrigation facilities, and rehabilitation of the staging area.
5. Project construction would require removal of approximately 10 cubic yards of leadcontaminated soil from the below-ground concrete structure. This would be replaced with 10 cubic yards of clean fill.
6. In addition to off-hauling 10 cubic yards of lead-contaminated soil, site grading would include 1,200 cubic yards of cut and 450 cubic yards of fill, with 750 cubic yards of soils off-hauled from the site. Demolition of the existing parking lot and section of Pine Avenue will generate approximately 600 cubic yards of debris, which would be off-hauled for recycling or disposal.
Nine trees would be removed and chipped. The estimated maximum depth of excavation is anticipated to be approximately 5 feet below ground surface for new utilities. If natural turf is selected for the lawn areas, the project would reduce the impervious surface area by 2,750 square feet, from 19,150 to 16,200 square feet, and increase the total pervious surface area from 13,150 to 16,100 square feet.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
10 7. Project construction would generate approximately 140 round-trip truck trips to haul soils, demolition debris (concrete, asphalt, trees, existing utility infrastructure), and construction materials (concrete paving, decomposed granite paving, engineered wood fiber [play safety surfacing], trees/shrubs, parking meters, irrigation equipment, lighting, play and exercise equipment, site furnishings, fencing, bollards, signage, and art elements).
8. Existing site materials would be recycled or reused following demolition, when feasible.
Demolished asphalt and concrete would be taken to an asphalt recycling facility. Various recycled materials would be used in construction, and durable, long-lasting exterior finish materials would be incorporated throughout the project. Standard construction equipment, including excavators, graders, tractors, loaders, off-haul trucks, rollers, and pavers, would be used during project construction. No pile driving is proposed.
9. Temporary fencing would be used to secure the project site. Access for construction would be from a temporary designated access gate and would include stormwater Best Management Practices (BMPs). Construction and materials staging would occur on-site. All work would comply with the Regional Water Quality Control Board (RWQCB) BMPs for stormwater management.
2.7 Required Discretionary Approvals
This Initial Study/Mitigated Negative Declaration (IS/MND) provides environmental information and analysis in compliance with the California Environmental Quality Act (CEQA), which is necessary for City decision makers to be able to adequately consider the effects of the project. The City, as the CEQA lead agency, has approval authority and responsibility for considering the environmental effects of the project as a whole. The City is responsible for authorizing and approving the project.
The project is requesting approval of the following actions and permits:
• Adoption of a Mitigated Negative Declaration
• Right-of-way abandonment and reconfiguration for Pine Avenue • City building permit and Parks and Recreation Commission approval • Grading permit
• Encroachment permit
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
11 3 ENVIRONMENTAL CHECKLIST AND ENVIRONMENTAL
EVALUATION
Environmental Factors Potentially Affected
The proposed project could have a “Potentially Significant Impact" for environmental factors checked below. Please refer to the attached pages for discussion on mitigation measures or project revisions to either reduce these impacts to less than significant levels or require further study. ☐ Aesthetics ☐ Greenhouse Gas Emissions ☐ Public Services ☐ Agriculture and Forestry
Resources
☐ Hazards and Hazardous
Materials
☐ Recreation
☐ Air Quality ☐ Hydrology and Water Quality ☐ Transportation ☐ Biological Resources ☐ Land Use and Planning ☐ Tribal Cultural Resources ☐ Cultural Resources ☐ Mineral Resources ☐ Utilities and Service Systems ☐ Energy ☐ Noise ☐ Wildfire
☐ Geology and Soils ☐ Population and Housing ☐ Mandatory Findings of Significance
Environmental Determination
On the basis of this initial evaluation:
☐ I find that the proposed project COULD NOT have a significant effect on the environment, and a NEGATIVE DECLARATION will be prepared.
☒ I find that although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because revisions in the project have been made by or agreed to by the project proponent. A MITIGATED NEGATIVE DECLARATION will be prepared.
☐ I find that the proposed project MAY have a significant effect on the environment, and an ENVIRONMENTAL IMPACT REPORT is required.
☐ I find that the proposed project MAY have a “potentially significant impact” or “potentially significant unless mitigated” impact on the environment, but at least one effect 1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measure based on the earlier analysis as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the effects that remain to be addressed.
☐ I find that although the proposed project could have a significant effect on the environment, because all potentially significant effects (a) have been analyzed adequately in an earlier EIR or NEGATIVE DECLARATION pursuant to applicable standards, and (b) have been avoided or mitigated pursuant to that earlier EIR or NEGATIVE DECLARATION, including revisions or mitigation measures that are imposed upon the proposed project, nothing further is required.
Date: November 18, 2025 Signed:
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
12 I. Aesthetics
Environmental Issues
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
Except as provided in Public Resources Code Section 21099, would the project:
(a) Have a substantial adverse effect on a scenic vista? ☐ ☐ ☒ ☐ (b) Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic
buildings within a state scenic highway?
☐ ☐ ☐ ☒
(c) In non-urbanized areas, substantially degrade the
existing visual character or quality of public views of the site and its surroundings? (public views are those
that are experienced from publicly accessible vantage
point). If the project is in an urbanized area, would the project conflict with applicable zoning and other
regulations governing scenic quality?
☐ ☐ ☒ ☐
(d) Create a new source of substantial light or glare
which would adversely affect day or nighttime views in
the area?
☐ ☐ ☒ ☐
Environmental Evaluation
a) Would the project have a substantial adverse effect on a scenic vista? Less than Significant. A scenic vista generally provides focal views of objects, settings, or features of visual interest, or panoramic views of large geographic areas of scenic quality, from a fixed vantage point or linear corridor, such as a roadway or trail. A significant impact would occur if a project introduced incompatible scenic elements within a field of view containing a scenic vista or substantially block views of an existing scenic vista.
The project site is located in the Downtown subarea between Lindenville and Sign Hill. The park site currently contains a parking lot and grassy field and is surrounded by residential and commercial areas (see Figure 1-2, Project Vicinity). The surrounding vicinity does not contain any designated historic buildings, rock outcroppings, or scenic highways. San Bruno Mountain State and County Park, approximately 0.5 mile northeast of the project site, is one of the most prominent features visible from the project site. It is a landmark of local and regional significance (although it is not designated as a scenic vista in the 2040 General Plan) and includes 2,416 acres of open space and 12 miles of hiking, riding, and jogging trails with views of the San Francisco Bay, Pacific Ocean, and San Francisco skyline. 14,15 San
Bruno Mountain is visible from the project site approximately 0.5 mile northeast. Sign Hill is not visible from the project site due to intervening buildings and trees. The project site is visible from several viewing points on San Bruno Mountain, as well as from neighborhoods on Linden Avenue and surrounding public streets.
The proposed project would include the replacement of an existing parking lot and grassy field with new park facilities, including a plaza, lawns, picnic facilities, playground equipment, a potential restroom, and 14 City of South San Francisco. 2022a. City of South San Francisco 2040 General Plan. Final Plan. Resolution #178-2022.
Adopted October 12. Available at: https://shapessf.com/. Accessed May 1, 2025. 15 County of San Mateo. 2025. County Parks: San Bruno Mountain State & County Park. Available at:
https://www.smcgov.org/parks/san-bruno-mountain-state-county-park. Accessed May 1, 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
13 parking. The project would also replace the existing parking lot with new, smaller parking areas and plant trees throughout the new park (see Figure 2-1, Project Site Plan).
Due to the topography of the project site and the construction of low-level (single-story) structures and play structures on the project site compared with the surrounding urban development, view changes typically would occur at limited vantage points, as opposed to along extensive roadway segments or from entire large geographic areas. The project would include the removal of approximately nine existing trees and the planting of approximately 30 to 35 new trees throughout the project site. While the project would alter the existing visual character of the project site vicinity, as it would replace the grassy field and parking lot with a park and smaller parking areas, including trees and landscaping, the project would not adversely affect a scenic vista or obstruct views of visual resources. Therefore, this impact would be less than significant, and mitigation is not required.
While the project site could be visible within panoramic views from San Bruno Mountain, the proposed project would be visually compatible with the existing urban setting of the area and would be in keeping with the surrounding urban development. Implementation of the project would not have a substantial adverse effect on a scenic vista. Therefore, this impact would be less than significant, and mitigation is not required.
Construction impacts would include excavation, grading, and ground disturbance; heavy equipment operation and staging areas for equipment parking and material storage; and additional truck traffic on haul routes. Construction would last approximately 8 to 10 months. Therefore, short-term visual impacts due to construction would be temporary and less than significant, and mitigation is not required. b) Would the project substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway?
No Impact. The project site is not within a scenic highway corridor. The nearest eligible scenic highway is Interstate Route (I-) 280, which is located approximately 2.2 miles southwest of the project site.16 The project area includes a grassy field and parking lot; therefore, it does not have other scenic resources such as rock outcroppings or historic buildings. Although the project would include the removal of approximately nine existing trees and the planting of approximately 30 to 35 new trees throughout the park. Therefore, the project would not substantially damage scenic resources, including those within a designated scenic highway, and no impact would occur.
c) In non-urbanized areas, would the project substantially degrade the existing visual character or quality of public views of the site and its surroundings? (public views are those that are experienced from publicly accessible vantage point). If the project is in an urbanized area, would the project conflict with applicable zoning and other regulations governing scenic quality? Less than Significant. The project is located on a parking lot and grassy field that both have a zoning designation of Parks and Recreation (PR) and General Plan Land Use designation of Parks and Recreation.
17 The project would include the replacement of the parking lot and grassy field with a new 16 California Department of Transportation (Caltrans). 2025. California State Scenic Highways. Available at:
https://dot.ca.gov/programs/design/lap-landscape-architecture-and-community-livability/lap-liv-i-scenic-highways. Accessed May 1, 2025.
17 City of South San Francisco. 2022a. City of South San Francisco 2040 General Plan. Final Plan. Resolution #178-2022.
Adopted October 12. Available at: https://shapessf.com/. Accessed May 1, 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
14 neighborhood park. Therefore, it would not conflict with applicable zoning (Table 3-1, Project Consistency with General Plan Policies).
Table 3-1. Project Consistency with General Plan Policies General Plan Policy Consistency
Policy LU-8.4: Require street trees. Require new
development to add street trees along streets and public spaces that provide shade, attractive landscaping, and
contribute positively towards public health outcomes and climate mitigation and adaptation.
Consistent. The project would plant approximately 30 to 35 trees, including new street trees along Linden Avenue,
7th Lane, and 8th Lane.
Policy LU-8.8: Maintain and protect public views. Maintain and protect unique public views of the city, the bay, and local landmarks from major thoroughfares and hillside open spaces.
Consistent. The project would not impact public views. New recreational facilities at the new Park at Linden and Pine Avenues would integrate and harmonize with the surrounding urban development and would not be distinguishable from San Bruno Mountain. A visual landscape screen of trees and
shrubs is proposed adjacent to all residential properties.
Policy LU-9.3: Require quality building materials. Require high-quality, long-lasting building materials on all new development projects in the city.
Consistent. The project includes quality building materials and infrastructure. If included as part of park construction, the ADA-accessible composite play structure will include durable and low-maintenance materials such as a steel structure, polyethylene play components, steel-reinforced cables that are vandal resistant, and latex-free rubber belting. The steel and polyethylene components will have a custom color selection to compliment and highlight the adjacent community. The ADAaccessible pre-manufactured restroom structure will be made of durable concrete blocks, non-absorbent concrete floors, and a utility chase, which will be housed opposite the restroom entrance.
Policy LU-9.4: Require walkable and inviting buildings and spaces. Require building design that creates walkable and inviting spaces, such as locating parking behind buildings, allowing for outdoor plazas and dining, and locating building frontages in close proximity to the sidewalk edge, where appropriate.
Consistent. The new park would add an outdoor plaza and event space and places for neighbors to gather. It would be easily accessible from surrounding streets and would include bicycle racks. The project would reduce the overall number of parking spaces but would provide ma van-accessible ADA
parking space.
As shown in Table 3-1, the project would be consistent with all policies related to visual and aesthetic impacts in the 2040 General Plan. 18 The project would not conflict with applicable zoning and other regulations governing scenic quality. Therefore, this impact would be less than significant, and mitigation is not required.
d) Would the project create a new source of substantial light or glare which would adversely affect day or nighttime views in the area? Less than Significant. The project would include street and access lighting as required by the City and meet all requirements of the City Zoning Code and applicable building codes. The project would retain existing double-acorn street lighting and refit the existing light fixtures with energy-efficient bulbs. New park lighting would complement the color of the existing light poles but would not be as traditional in style. As required by South San Francisco Municipal Code Section 20.300.009, Lighting and Illumination, all lighting fixtures would be fully shielded and located to avoid light spillover to adjacent properties. Further, light fixtures would not exceed 16 feet in height, and any light fixture located within 50 feet of a residence or public right-of-way would be further shielded to minimize light trespass onto adjacent properties. The project would not create a new source of substantial light or glare that would 18 City of South San Francisco. 2022a. City of South San Francisco 2040 General Plan. Final Plan. Resolution #178-2022.
Adopted October 12. Available at: https://shapessf.com/. Accessed May 1, 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
15 adversely affect day or nighttime views in the area. Therefore, this impact would be less than significant, and mitigation is not required.
II. Agriculture and Forestry Resources
Environmental Issues
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
In determining whether impacts to agricultural resources are significant environmental effects, lead agencies may refer to the California Agricultural Land Evaluation and Site Assessment Model (1997) prepared by the California Dept. of Conservation as an optional model to use in assessing impacts on agriculture and farmland. In determining whether impacts to forest resources, including timberland, are significant environmental effects, lead agencies may refer to information compiled by the California Department of Forestry and Fire Protection regarding the state’s inventory of forest land, including the Forest and Range Assessment Project and the Forest Legacy Assessment project; and forest carbon measurement methodology provided in Forest Protocols adopted by the California Air Resources Board. Would the project:
(a) Convert Prime Farmland, Unique Farmland, or
Farmland of Statewide Importance (Farmland), as
shown on the maps prepared pursuant to the
Farmland Mapping and Monitoring Program of the
California Resources Agency, to non-agricultural use?
☐ ☐ ☐ ☒
(b) Conflict with existing zoning for agricultural use, or a Williamson Act contract?
☐ ☐ ☐ ☒
(c) Conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code
Section 12220(g)), timberland (as defined by Public
Resources Code Section 4526), or timberland zoned
Timberland Production (as defined by Government
Code Section 51104(g))?
☐ ☐ ☐ ☒
(d) Result in the loss of forest land or conversion of forest land to non-forest use?
☐ ☐ ☐ ☒
(e) Involve other changes in the existing environment
which, due to their location or nature, could result in conversion of Farmland, to non-agricultural use or
conversion of forest land to non-forest use?
☐ ☐ ☐ ☒
Environmental Evaluation
a) Would the project convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non-agricultural use?
No Impact. The project site is located in the city of South San Francisco on two urban lots surrounded by residential and commercial development. There is no agricultural or forest land in the vicinity of the project site. The project site has a land use designation of Parks and Recreation in the 2040 General Plan.
19 The areas surrounding the project site are designated as Medium Density Residential and Commercial; no parcels within the project vicinity are zoned for agricultural use.20 Therefore, no impact would occur.
19 City of South San Francisco. 2022a. City of South San Francisco 2040 General Plan. Final Plan. Resolution #178-2022.
Adopted October 12. Available at: https://shapessf.com/. Accessed March 8, 2025. 20 City of South San Francisco. 2025a. SSF Zoning Search App. Available at: https://zoning.ssf.net/. Accessed March 12, 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
16 b) Would the project conflict with existing zoning for agricultural use, or a Williamson Act contract?
No Impact. The proposed project is located in a City park and is not under Williamson Act contract, and the surrounding area is not zoned for agricultural use or under Williamson Act contract. The project would not conflict with existing zoning for agricultural use or Williamson Act contracts. Therefore, no impact would occur.
c) Would the project conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code Section 12220(g)), timberland (as defined by Public Resources Code Section 4526), or timberland zoned Timberland Production (as defined by Government Code Section 51104(g))? No Impact. The proposed project is located in a City park and is not zoned for timberland or timberland production. The project vicinity is urban, and there are no areas zoned for timber or timber production in the city.21 Therefore, no impact would occur.
d) Would the project result in the loss of forest land or conversion of forest land to non-forest use?
No Impact. There is no forest land in the vicinity of the project.22 Therefore, no impact would occur. e) Would the project involve other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland, to nonagricultural use or conversion of forest land to non-forest use? No Impact. The project is located on a parking lot and grassy field and the surrounding area includes urban uses. There is no farmland or forest land in the vicinity of the project. The project would not result in the conversion of farmland or forest land. Therefore, no impact would occur.
III. Air Quality
Environmental Issues
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
Where available, the significance criteria established by the applicable air quality management district or air pollution control district may be relied upon to make the following determinations. Would the project:
(a) Conflict with or obstruct implementation of the
applicable air quality plan? ☐ ☐ ☐ ☒
(b) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is
non-attainment under an applicable federal or state
ambient air quality standard?
☐ ☐ ☒ ☐
(c) Expose sensitive receptors to substantial pollutant concentrations?
☐ ☐ ☒ ☐
21 City of South San Francisco. 2025a. SSF Zoning Search App. Available at: https://zoning.ssf.net/. Accessed March 12, 2025. 22 City of South San Francisco, 2025a.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
17 Environmental Issues
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
(d) Result in other emissions (such as those leading to odors) adversely affecting a substantial number of
people?
☐ ☐ ☒ ☐
Environmental Evaluation
The proposed project is located within the San Francisco Bay Area Air Basin, which consists of the entirety of Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, and Santa Clara Counties; the western portion of Solano County; and the southern portion of Sonoma County. The air basin is characterized by complex terrain consisting of coastal mountain ranges, inland valleys, and bays. The regional climate of the air basin is characterized by mildly dry summers and moderately wet winters. The region experiences moderate humidity with wind patterns consisting of mild onshore breezes during the day. The location of a strong subtropical high-pressure cell located in the Pacific Ocean induces foggy mornings and moderate temperatures during the summer, as well as occasional rainstorms during the winter. The air pollutants for which national and state standards have been promulgated and that are most relevant to air quality planning and regulation in the Bay Area include ozone (O3), nitrogen oxides (NOX), nitrogen dioxide (NO2), carbon monoxide (CO), and particulate matter, including dust, 10 microns or less in diameter (PM10) and 2.5 micrometers or less in diameter (PM2.5). In addition, toxic air contaminants (TACs) are of concern in the Bay Area. Each of these pollutants is briefly described below:
• O3 is a strong-smelling, pale blue, reactive, toxic chemical gas consisting of three oxygen atoms.
It is a secondary pollutant formed in the atmosphere by a photochemical process involving the sun’s energy and O3 precursors. These precursors are mainly NOX and volatile organic compounds (VOCs). The maximum effects of precursor emissions on O3 concentrations usually occur several hours after they are emitted and many miles from the source. Meteorology and terrain play major roles in O3 formation, and ideal conditions occur during summer and early autumn on days with low wind speeds or stagnant air, warm temperatures, and cloudless skies.
O3 exists in the upper atmosphere O3 layer (stratospheric ozone) and at the Earth’s surface in the troposphere (ozone).
The O3 that the U.S. Environmental Protection Agency (EPA) and the California Air Resources Board (CARB) regulates as a criteria air pollutant is produced close to the ground level, where people live, exercise, and breathe. Ground-level O3 is a harmful air pollutant that causes numerous adverse health effects and is thus considered “bad” O3. Stratospheric, or “good,” O3 occurs naturally in the upper atmosphere, where it reduces the amount of ultraviolet light (i.e., solar radiation) entering the Earth’s atmosphere. Without the protection of the beneficial stratospheric O3 layer, plant and animal life would be seriously harmed. O3 in the troposphere causes numerous adverse health effects; short-term exposures (lasting for a few hours) can result in breathing pattern changes, reduction of breathing capacity, increased susceptibility to infections, inflammation of the lung tissue, and some immunological changes.23 These health problems are particularly acute in sensitive receptors such as the sick, the elderly, and young children.
23 U.S. Environmental Protection Agency (EPA). 2024a. Health Effects of Ozone Pollution. Available at:
https://www.epa.gov/ground-level-ozone-pollution/health-effects-ozone-pollution. Accessed July 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
18 • NO2 is a brownish, highly reactive gas that is present in all urban atmospheres. The major mechanism for the formation of NO2 in the atmosphere is the oxidation of the primary air pollutant nitric oxide, which is a colorless, odorless gas. NOX plays a major role, together with VOCs, in the atmospheric reactions that produce O3. NOX is formed from fuel combustion under high temperature or pressure. In addition, NOX is an important precursor to acid rain and may affect both terrestrial and aquatic ecosystems. The two major emissions sources are transportation and stationary fuel combustion sources such as electric utility and industrial boilers. NO2 can irritate the lungs, cause bronchitis and pneumonia, and lower resistance to respiratory infections.24 • CO is a colorless, odorless gas formed by the incomplete combustion of hydrocarbon, or fossil fuels that is emitted almost exclusively from motor vehicles, power plants, refineries, industrial boilers, ships, aircraft, and trains. In urban areas, such as the project location, automobile exhaust accounts for the majority of CO emissions. CO is a nonreactive air pollutant that dissipates relatively quickly; therefore, ambient CO concentrations generally follow the spatial and temporal distributions of vehicular traffic. CO concentrations are influenced by local meteorological conditions—primarily wind speed, topography, and atmospheric stability. CO from motor vehicle exhaust can become locally concentrated when surface-based temperature inversions are combined with calm atmospheric conditions, which is a typical situation at dusk in urban areas from November to February. The highest levels of CO typically occur during the colder months of the year, when inversion conditions are more frequent. In terms of adverse health effects, CO competes with oxygen, often replacing it in the blood, reducing the blood’s ability to transport oxygen to vital organs. The results of excess CO exposure can include dizziness, fatigue, and impairment of central nervous system functions.25
• Particulate matter pollution consists of very small liquid and solid particles floating in the air, which can include smoke, soot, dust, salts, acids, and metals. Particulate matter can form when gases emitted from industries and motor vehicles undergo chemical reactions in the atmosphere.
PM2.5 and PM10 represent fractions of particulate matter.
Coarse particulate matter (PM10) is about 1/7 the thickness of a human hair, and major sources include crushing or grinding operations; dust stirred up by vehicles traveling on roads; woodburning stoves and fireplaces; dust from construction, landfills, and agriculture; smoke from wildfires and brush and waste burning; industrial sources; windblown dust from open lands; and atmospheric chemical and photochemical reactions.
Fine particulate matter (PM2.5) is roughly 1/28 the diameter of a human hair and results from fuel combustion (e.g., from motor vehicles and power generation and industrial facilities), residential fireplaces, and woodstoves. In addition, PM2.5 can be formed in the atmosphere from gases such as sulfur oxides (SOx), NOX, and VOCs.
PM2.5 and PM10 pose a greater health risk than larger-size particles. When inhaled, these tiny particles can penetrate the human respiratory system’s natural defenses and damage the respiratory tract. PM2.5 and PM10 can increase the number and severity of asthma attacks, cause or aggravate bronchitis and other lung diseases, and reduce the body’s ability to fight infections.
Very small particles of substances such as lead, sulfates, and nitrates can cause lung damage directly or be absorbed into the bloodstream, causing damage elsewhere in the body.
Additionally, these substances can transport adsorbed gases such as chlorides or ammonium into the lungs, also causing injury. Whereas PM10 tends to collect in the upper portion of the respiratory system, PM2.5 is so tiny that it can penetrate deeper into the lungs and damage lung 24 U.S. Environmental Protection Agency (EPA). 2024b. Basic Information about NO2. Available at: https://www.epa.gov/no2- pollution/basic-information-about-no2#Effects. Accessed July 2025. 25 U.S. Environmental Protection Agency (EPA). 2024c. Basic Information about Carbon Monoxide Outdoor Air Pollution.
Available at: https://www.epa.gov/indoor-air-quality-iaq/what-carbon-monoxide. Accessed July 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
19 tissue. Suspended particulates also damage and discolor surfaces on which they settle and produce haze and reduce regional visibility. People with influenza, people with chronic respiratory and cardiovascular diseases, and the elderly may suffer worsening illness and premature death as a result of breathing particulate matter. People with bronchitis can expect aggravated symptoms from breathing in particulate matter. Children may experience a decline in lung function due to breathing in PM2.5 and PM10.
26 • TACs refer to a diverse group of “non-criteria” air pollutants that can affect human health but have not had ambient air quality standards established for them. This is not because they are fundamentally different from the pollutants discussed above, but because their effects tend to be local rather than regional.
TACs are identified by federal and state agencies based on a review of available scientific evidence. In the state of California, TACs are identified through a two-step process that was established in 1983 under the Toxic Air Contaminant Identification and Control Act. This twostep process of risk identification and risk management and reduction was designed to protect residents from the health effects of toxic substances in the air. In addition, the California Air Toxics “Hot Spots” Information and Assessment Act, Assembly Bill (AB) 2588, was enacted by the state legislature in 1987 to address public concern over the release of TACs into the atmosphere. The law requires facilities emitting toxic substances to provide local air pollution control districts with information that will allow an assessment of the air toxics problem, identification of air toxics emissions sources, location of resulting hot spots, notification of the public exposed to significant risk, and development of effective strategies to reduce potential risks to the public over 5 years.
The federal TACs are air pollutants that may cause or contribute to an increase in mortality or serious illness, or which may pose a hazard to human health, although there are no ambient standards established for TACs. Many pollutants are identified as TACs because of their potential to increase the risk of developing cancer or other acute (short-term) or chronic (long-term) health problems. For TACs that are known or suspected carcinogens, the CARB has consistently found that there are no levels or thresholds below which exposure is risk free. Individual TACs vary greatly in the risks they present; at a given level of exposure, one TAC may pose a hazard that is many times greater than another. For certain TACs, a unit risk factor can be developed to evaluate cancer risk. For acute and chronic health effects, a similar factor, called a Hazard Index, is used to evaluate risk. TACs are identified and their toxicity is studied by the California Office of Environmental Health Hazard Assessment (OEHHA).
Examples of TAC sources include industrial processes, dry cleaners, gasoline stations, paint and solvent operations, and fossil fuel combustion sources. The TAC that is relevant to the implementation of the project include diesel particulate matter (diesel PM). Diesel PM was identified as a TAC by the CARB in August 1998.27 Diesel PM is emitted from both mobile and stationary sources. In California, on-road diesel-fueled vehicles contribute approximately 40% of the statewide total, with an additional 57% attributed to other mobile sources such as construction and mining equipment, agricultural equipment, and transport refrigeration units. Stationary sources, contributing about 3% of emissions, include shipyards, warehouses, heavy-equipment repair yards, and oil and gas production operations. Emissions from these sources are from diesel26 U.S. Environmental Protection Agency (EPA). 2024d. Particulate Matter Basics. Available at: https://www.epa.gov/pmpollution/health-and-environmental-effects-particulate-matter-pm. Accessed July 2025. 27 California Air Resources Board (CARB). 1998. Report to the Air Resources Board on the Proposed Identification of Diesel Exhaust as a Toxic Air Contaminant, Part A Exposure Assessment. As approved by the Scientific Review Panel on April 22, 1998. Available at:
https://ww2.arb.ca.gov/sites/default/files/classic/toxics/dieseltac/part_a.pdf?_ga=2.170343008.1594849109.1690912838- 1957288001.1685472643. Accessed August 4, 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
20 fueled internal combustion engines. Stationary sources that report diesel PM emissions also include heavy construction, manufacturers of asphalt paving materials and blocks, and dieselfueled electrical generation facilities.
Exposure to diesel PM can have immediate health effects. Diesel PM can have a range of health effects including irritation of eyes, throat, and lungs, causing headaches, lightheadedness, and nausea. Exposure to diesel PM also causes inflammation in the lungs, which may aggravate chronic respiratory symptoms and increase the frequency or intensity of asthma attacks. Children, the elderly, and people with emphysema, asthma, and chronic heart and lung disease are especially sensitive to fine-particle pollution. In California, diesel PM has been identified as a carcinogen.
Other pollutants that are regulated but not considered an issue in the project area are sulfur dioxide, vinyl chloride, sulfates, hydrogen sulfide, and lead; the proposed project would not emit substantial quantities of those pollutants, so they are not discussed further in this section.
Construction and operation of the proposed project would be subject to applicable Bay Area Air District (BAAD; formerly the Bay Area Air Quality Management District [BAAQMD]) rules and requirements.
The BAAD CEQA thresholds and guidelines were developed to assist local jurisdictions and lead agencies in complying with the requirements of CEQA regarding potentially adverse impacts to air quality. The screening criteria established by the Bay Area Air Quality Management District California Environmental Quality Act Air Quality Guidelines, dated April 2022 (BAAQMD 2022 CEQA Guidelines),28 have been relied upon to make the following significance determinations. a) Would the project conflict with or obstruct implementation of the applicable air quality plan?
No Impact. The 2017 Clean Air Plan29 is the current applicable regional air quality plan for the San Francisco Bay Area Air Basin. The primary goals of the 2017 Clean Air Plan are to protect public health and protect the climate, and the plan acknowledges that the BAAD’s two stated goals of protection are closely related. As such, the 2017 Clean Air Plan identifies a wide range of control measures intended to decrease both criteria pollutants and greenhouse gas (GHG) emissions. The development of the project would demolish and rebuild an existing community park and provide a new public space for residents of the neighborhood to gather, connect, and play. The proposed project does not involve substantial employment growth (none anticipated). Determining consistency with the 2017 Clean Air Plan involves assessing whether applicable control measures contained in the 2017 Clean Air Plan are implemented and whether implementation of the proposed project would disrupt or hinder implementation of air quality plan control measures. The control measures are organized into five categories: 1) stationary and area source control measures; 2) mobile source measures; 3) transportation control measures; 4) land use and local impact measures; and 5) energy and climate measures. The control measures are geared toward traditional land uses (e.g., residential, commercial, industrial uses) and buildings. All control measures contained in the 2017 Clean Air Plan applicable to the project will be implemented. In addition, all projects within BAAD’s jurisdiction are required to implement the BAAD standard control measures or BMPs during construction activities. As discussed, the proposed project would implement all BMPs for construction activities and would be consistent with the assumptions in the air quality plan. Furthermore, the proposed project would not include any special features that would disrupt or hinder implementation 28 Bay Area Air Quality Management District (BAAQMD). 2022. California Environmental Quality Act Air Quality Guidelines.
April. Available at: https://www.baaqmd.gov/?sc_itemid=CDA5FAE5-BBDC-4337-A10C-5648BCD2D71F. Accessed May 2025.
29 Bay Area Air Quality Management District (BAAQMD). 2017. 2017 Clean Air Plan: Spare the Air, Cool the Climate.
Adopted April 19. Available at: https://www.baaqmd.gov/~/media/files/planning-and-research/plans/2017-clean-airplan/attachment-a_-proposed-final-cap-vol-1-pdf.pdf?la=en. Accessed May 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
21 of the air quality plan control measures. Therefore, the proposed project would not obstruct implementation of the 2017 Clean Air Plan.
Furthermore, the thresholds of significance, adopted by the BAAD, determine compliance with the goals of attainment plans in the region. As such, emissions below the BAAD significance thresholds would not conflict with or obstruct implementation of the applicable air quality plan. Estimated construction and operation air emissions were calculated for the project using the current version of the California Emissions Estimator Model (CalEEMod).30 As shown in Table 3-2, Estimated Average Daily Construction Criteria Air Pollutant Emissions, and Table 3-4, Unmitigated Operational Emissions Summary, in Impact Discussion III(b), the estimated emissions from project construction and operation are below the thresholds of significance. The project does not conflict with implementation of the BAAD applicable air quality plan. Therefore, no impact would occur. b) Would the project result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable federal or state ambient air quality standard? Less than Significant. The BAAD’s thresholds of significance represent the allowable emissions a project can generate without generating a cumulatively considerable contribution to regional air quality impacts. Therefore, a project that would not exceed the BAAD thresholds of significance on a project level also would not be considered to result in a cumulatively considerable contribution to these regional air quality impacts. The region is non-attainment for the federal and state ozone standards, state PM10 standards, and federal and state PM2.5 standards. Impacts related to construction and operation of the proposed project are addressed separately below.
Construction
Implementation of the project would generate emissions of criteria air pollutants during construction. The estimated mitigated and unmitigated emissions from construction of the project are summarized in Table 3-2, Estimated Average Daily Construction Criteria Air Pollutant Emissions. The CalEEMod outputs, which include detailed model assumptions, are provided in Appendix C.
Table 3-2. Estimated Average Daily Construction Criteria Air Pollutant Emissions Pounds per Day (Average)
ROG NOX CO PM10 PM2.5 SO2
Construction Emissions (Unmitigated) 1.07 9.22 10.95 5.40 1.05 0.025 Construction Emissions (Mitigated) 1.07 9.22 10.95 2.14 0.61 0.025 Bay Area Air District Threshold 54 54 N/A 82 54 N/A
Threshold Exceeded? No No N/A No No No
Source: California Air Pollution Control Officers Association (CAPCOA) (2022) (see Appendix C); BAAQMD (2022). 31 Emissions from construction-related activities are generally short term in duration but may still cause adverse air quality impacts. The proposed project would generate emissions from construction equipment 30 California Air Pollution Control Officers Association (CAPCOA). 2022. California Emissions Estimator Model (CalEEMod).
Version 2022.1.1.29. Available at: https://www.caleemod.com/. Accessed June 2025. 31 Bay Area Air Quality Management District (BAAQMD). 2022. California Environmental Quality Act Air Quality Guidelines.
April. Available at: https://www.baaqmd.gov/?sc_itemid=CDA5FAE5-BBDC-4337-A10C-5648BCD2D71F. Accessed May 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
22 exhaust, worker travel, and fugitive dust. These construction emissions include criteria air pollutants and precursors from the operation of heavy construction equipment. As discussed below, the proposed project’s construction emissions would not exceed any significance threshold adopted for this project.
Therefore, the proposed project would have a less-than-significant contribution to cumulative impacts during construction.
For all proposed projects, the BAAD recommends the implementation of BMPs, whether or not construction-related emissions exceed applicable thresholds of significance. As such, to ensure construction emission impacts are less than significant, the proposed project would apply the following BAAD BMPs during construction activities at the proposed project site:
• Exposed surfaces (e.g., parking areas, staging areas, soil piles, graded areas, unpaved access roads) shall be watered with non-potable water two times per day. • All haul trucks transporting soil, sand, or other loose material off-site shall be covered. • All visible mud or dirt track-out onto adjacent public roads shall be removed using wet power vacuum street sweepers at least once per day. The use of dry power sweeping is prohibited. • All roadways, driveways, and sidewalks shall be paved as soon as possible. • Idling times shall be minimized either by shutting equipment off when not in use or by reducing the maximum idling time to 5 minutes (as required by the California Airborne Toxics Control Measure in 13 California Code of Regulations [CCR] 2485). Clear signage shall be provided for construction workers at all access points.
• All construction equipment shall be maintained and properly tuned in accordance with manufacturer’s specifications. All equipment shall be checked by a certified visible emissions evaluator.
• A publicly visible sign shall be posted with the telephone number and person to contact at the City regarding dust complaints. This person shall respond and take corrective action within 48 hours of a complaint or issue notification. The BAAD’s phone number shall also be visible to ensure compliance with applicable regulations.
Construction emissions associated with the proposed project, including emissions associated with the operation of off-road equipment, haul-truck trips, on-road worker vehicle trips, vehicle travel on paved and unpaved surfaces, and fugitive dust from material handling activities, were calculated using the current version of CalEEMod.32 CalEEMod is a statewide land use emissions computer model designed to provide a uniform platform for government agencies, land use planners, and environmental professionals to quantify potential criteria pollutant and GHG emissions associated with both construction and operation of a variety of land use projects. Emissions modeling included emissions generated during the following project phases: demolition (including demolition of the existing parking lot), site preparation (including grading, grubbing, and utility trenching), building construction (including the new Pine Avenue alignment, hardscape, utilities, sidewalks, and pathways), paving (including the new parking lot), and architecture coating. Based on applicant-provided information, it is expected that construction activities associated with the proposed project would last 10 months. Table 3-3, Estimated Construction Schedule, Equipment and Vehicle Trips, shows the construction schedule, off-road construction equipment, worker and vendor trips, and on-site haul truck trips used to estimate emissions. Table 3-3 shows estimated air pollutant emissions. The exhaust emissions generated by construction equipment are based on the hours of operation, horsepower, and load factors of the equipment for which CalEEMod defaults were utilized. The CalEEMod outputs are provided in Appendix C. 32 California Air Pollution Control Officers Association (CAPCOA). 2025. California Emissions Estimator Model (CalEEMod).
Version 2022.1.1.30. Available at: https://www.caleemod.com/. Accessed June 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
23 Table 3-3. Estimated Construction Schedule, Equipment and Vehicle Trips Phase
(Duration)
Equipment Used
Type Number Daily Vehicle Trips
Hours/
Day
1. Demolition
03/01/2026–04/01/2026
(23 working days)
Tractors/Loaders/Backhoes 3 8 80 one-way worker trips
4 one-way vendor trips
40 one-way haul truck trips
5 trucks driving 1 mile of on-site truck travel
Rubber Tired Dozers 1 8
Concrete/Industrial Saws 1 8
2. Site Preparation
03/30/2026–04/01/2026
(2 working days)
Graders 1 8 0 one-way worker trips
0 one-way vendor trips
0 one-way haul truck trips
0 trucks driving 1 mile of on-site truck travel
Rubber Tired Dozers 1 7
Tractors/Loaders/Backhoes 1 8
3. Grading
03/01/2026–04/01/2026
(23 working days)
Graders 1 8
0 one-way worker trips
0 one-way vendor trips
0 one-way haul truck trips
0 trucks driving 1 mile of on-site truck travel
Tractors/Loaders/Backhoes 2 7
Rubber Tired Dozers 1 8
Off-Highway Trucks 1 5
4. Building Construction
04/02/2026–12/31/2026
(196 working days)
Cranes 1 6
80 one-way worker trips
4 one-way vendor trips
20 one-way haul truck trips
5 trucks driving 1 mile of on-site truck travel
Forklifts 1 6
Generator Sets 1 8
Tractors/Loaders/Backhoes 1 6
Welders 3 8
Off-Highway Trucks 1 5
5. Paving
12/04/2026–12/17/2026
(10 working days)
Tractors/Loaders/Backhoes 1 8
0 one-way worker trips
0 one-way vendor trips
0 one-way haul truck trips
0 trucks driving 1 mile of on-site truck travel
Pavers 1 6
Paving Equipment 1 8
Rollers 1 7
Cement and Mortar Mixers 1 6
6. Architectural Coating
12/04/2026–12/17/2026
(10 working days)
Air Compressors 1 6
0 one-way worker trips
0 one-way vendor trips
0 one-way haul truck trips
0 trucks driving 1 mile of on-site truck travel
Source: California Air Pollution Control Officers Association (CAPCOA) (2022)33 (see Appendix C); BAAQMD (2022). 34 Operation
Project operations would generate VOC, NOX, CO, SOX, PM10, and PM2.5 emissions from mobile sources, including vehicle trips; area sources, including the use of consumer products, architectural coatings for repainting, and landscape maintenance equipment; water; waste; and energy sources. The estimated emissions from operation of the project are summarized in Table 3-4, Unmitigated Operational Emissions Summary. Complete details of the emissions calculations are provided in Appendix C. 33 California Air Pollution Control Officers Association (CAPCOA). 2022. California Emissions Estimator Model (CalEEMod).
Version 2022.1.1.29. Available at: https://www.caleemod.com/. Accessed June 2025. 34 Bay Area Air Quality Management District (BAAQMD). 2022. California Environmental Quality Act Air Quality Guidelines.
April. Available at: https://www.baaqmd.gov/?sc_itemid=CDA5FAE5-BBDC-4337-A10C-5648BCD2D71F. Accessed May 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
24 Table 3-4. Unmitigated Operational Emissions Summary Operation Year 2027
Unmitigated Operational Emissions Summary
ROG NOX CO PM10 PM2.5 SO2
Pollutant Emission (average pounds per day)
Mobile 0.54 0.42 4.56 1.32 0.34 0.013
Area 0.01 0 0 0 0 0
Energy 0 0 0 0 0 0
Total 0.55 0.42 4.56 1.32 0.34 0.013
Bay Area Air District Threshold 54 54 N/A 82 54 N/A
Threshold Exceeded? No No N/A No No N/A
Pollutant Emission (tons per year)
Mobile 0.10 0.08 0.83 0.24 0.06 0.002
Area 0.002 0 0 0 0 0
Energy 0 0 0 0 0 0
Total 0.10 0.08 0.83 0.24 0.06 0.002
Bay Area Air District Threshold 10 10 N/A 15 10 N/A
Threshold Exceeded? No No N/A No No N/A
Source: Emissions were quantified using CalEEMod (California Air Pollution Control Officers Association [CAPCOA] 2022).35 Notes: N/A = Not applicable, no threshold. ROG = reactive organic gases. Model results (summer, winter, and annual) and assumptions are provided in Appendix C. Totals do not always equal the sum of individual numbers because of rounding.
As Table 3-4 shows, estimated unmitigated operational emissions for all pollutants are below BAAD significance thresholds. Also, project operations would meet the BAAD CO hotspot analysis screening criteria regarding traffic volumes at any affected intersection. Therefore, the proposed project would not need a CO hotspot analysis. Although the project would create visitors with the new city park, there will also be the removal of approximately 10 cubic yards of lead-contaminated soil, landscaping would include drought tolerant and native species with new efficient drip irrigation that meets state WELO requirements36 and updated energy-efficient bulbs in light fixtures. Although the proposed project would result in a net increase in the number of vehicle trips due to City park events, it aligns with Goal 2 of the Parks and Recreation Master Plan, including that “every South San Francisco resident should be within a 5-minute walk of a park, trail or open space” and nearby residents would not have to travel to facilities in other cities. The project would comply with local requirements for waste management (e.g., recycling and composting services). Therefore, the project would be consistent with the Waste Management Control Measures of the 2017 Clean Air Plan. The combined construction emissions and combined operational emissions from all components of the proposed project are below the recommended BAAD thresholds of significance and the project would not be anticipated to exceed any significance threshold. Therefore, the project have a less-than-significant contribution to cumulative impacts, and mitigation is not required. 35 California Air Pollution Control Officers Association (CAPCOA). 2022. California Emissions Estimator Model (CalEEMod).
Version 2022.1.1.29. Available at: https://www.caleemod.com/. Accessed June 2025. 36 County of San Mateo. 2025. Water Efficient Landscape Ordinance (WELO). County of San Mateo Planning and Building.
Available at: https://www.smcgov.org/planning/water-efficient-landscape-ordinance-welo. Accessed April 10, 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
25 c) Would the project expose sensitive receptors to substantial pollutant concentrations?
Less than Significant. While criteria pollutants (such as particulate matter [PM10 and PM2.5]) are a concern at the regional level, community risk impacts from TACs and annual PM2.5 exposure to nearby sensitive receptors are also a localized concern. While Impact Discussion III(b) addressed particulate matter at the regional level, this impact addresses particulate matter at the localized level. Impacts related to increased community risk can occur either by introducing new sensitive receptors, such as residences, in proximity to existing sources of TACs or by introducing a new source of TACs with the potential to adversely affect existing sensitive receptors in the project vicinity.
The BAAD considers a sensitive receptor to be any facility or land use that includes members of the population who are particularly sensitive to the effects of air pollutants, such as children, the elderly, and people with illnesses. The sensitive receptors within 1,000 feet of the project include residences, Martin Elementary School (456 feet), and Spruce Elementary School (580 feet). However, implementation of the proposed project would not result in the long-term operation of any emission sources that would adversely affect nearby sensitive receptors. Use of park facilities—play and fitness equipment, picnic areas, and event spaces—would not produce air emissions. Short-term (10 months) construction activities could result in temporary increases in pollutant concentrations. The construction-related emissions would be short term and at different locations within the project site. The limited duration and limited quantities of construction emissions ensure that no individual receptor would be exposed to substantial pollutant concentrations. During construction, the BAAD BMPs would minimize construction impacts by reducing dust and exhaust emissions. The project would not affect operations of the adjacent residential units .
Construction and operation of the project would not expose sensitive receptors to substantial pollutant concentrations. Therefore, this impact would be less than significant, and mitigation is not required. d) Would the project result in other emissions (such as those leading to odors) adversely affecting a substantial number of people?
Less than Significant. The project would not be a source of any odors during operations. During construction, a limited number of diesel engines would be operated on the project site for limited durations. Diesel exhaust and VOCs from these diesel engines would be emitted during construction of the proposed project, which are objectionable to some; however, the duration of construction activities is expected to last approximately 10 months, emissions would disperse rapidly from the project site, and diesel exhaust odors would be consistent with existing vehicle odors in the area. Considering this information, construction and operation of the proposed project would not create other emissions or odors adversely affecting a substantial number of people. Therefore, this impact would be less than significant, and mitigation is not required.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
26 IV. Biological Resources
Environmental Issues
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
Would the project:
(a) Have a substantial adverse effect, either directly or through habitat modifications, on any species
identified as a candidate, sensitive, or special status species in local or regional plans, policies, or
regulations, or by the California Department of Fish
and Wildlife or U.S. Fish and Wildlife Service?
☐ ☐ ☐ ☒
(b) Have a substantial adverse effect on any riparian
habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the California Department of Fish and Wildlife or US
Fish and Wildlife Service?
☐ ☐ ☐ ☒
(c) Have a substantial adverse effect on state or federally protected wetlands (including, but not limited to,
marsh, vernal pool, coastal, etc.) through direct
removal, filling, hydrological interruption, or other
means?
☐ ☐ ☒ ☐
(d) Interfere substantially with the movement of any
native resident or migratory fish or wildlife species or with established native resident or migratory wildlife
corridors, or impede the use of native wildlife nursery sites?
☐ ☒ ☐ ☐
(e) Conflict with any local policies or ordinances
protecting biological resources, such as a tree
preservation policy or ordinance?
☐ ☐ ☒ ☐
(f) Conflict with the provisions of an adopted Habitat
Conservation Plan, Natural Community Conservation
Plan, or other approved local, regional, or state
habitat conservation plan?
☐ ☐ ☐ ☒
Environmental Evaluation
a) Would the project have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service? No Impact. The project site includes an active parking lot, a grassy field with a footpath, and nine trees (see Figure 2-1, Project Site Plan). Located in an urbanized area, the project site is surrounded by residential and commercial areas. The project topography is primarily level, with elevations from 24 to 29 feet above mean sea level.
The project does not include habitat for a candidate, sensitive, or special-status species in local or regional plans or regulations or by the California Department of Fish and Wildlife (CDFW) or U.S. Fish and Wildlife Service (USFWS). The project would not have a substantial effect on sensitive species either directly through habitat modification. Therefore, no impact would occur.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
27 b) Would the project have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the California Department of Fish and Game or US Fish and Wildlife Service?
No Impact. The project is located on two empty lots in an urban area. There is no riparian or other sensitive habitat identified on or in the vicinity of the project site. The nearest waterbody is Colma Creek, approximately 0.6 mile south. The project would not have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, or regulations or by the CDFW or USFWS. Therefore, no impact would occur. c) Would the project have a substantial adverse effect on state or federally protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means? Less than Significant. The project is located on two empty lots in an urban area. There are no wetlands identified on or in the vicinity of the project site. The nearest waterbody is Colma Creek, approximately
0.6 mile south. Therefore, the project would not have a substantial adverse effect on any wetland habitat identified in local or regional plans, policies, or regulations or by the CDFW or USFWS. Therefore, no impact would occur.
The project would disturb less than 1 acre (approximately 0.80 acre) of land; therefore, the City would not be required to implement a Stormwater Pollution Prevention Plan (SWPPP) for the project. Excavation and grading for the project would occur throughout the project site. Stormwater runoff from excavation and construction activities could impact water quality in the stormwater system if it were allowed to discharge from the project site. Standard conditions of approval for all construction projects in the city include all stormwater quality BMPs required by the San Mateo Countywide Water Pollution Prevention Program (SMCWPPP) (see Section X, Hydrology and Water Quality). All construction activities would be required to implement BMPs to comply with the SMCWPPP, which would prevent sediment-laden runoff and/or pollutants from entering the stormwater system. Implementation of BMPs required by the SMCWPPP would prevent contaminated stormwater runoff from discharging into the stormwater system.
Therefore, impacts to federally or state-protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.), through direct removal, filling, hydrological interruption, or other means, would be less than significant, and mitigation is not required.
d) Would the project interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites?
Less than Significant with Mitigation Incorporated. Due to the fragmentation, development, and high level of disturbance and human activity in the project area, the project is not anticipated to adversely affect a wildlife movement corridor. The existing grassy field and parking lot with street trees is unlikely to provide migration habitat for wildlife. The surrounding area includes urban development and would not include any wildlife corridors. Therefore, the project is not expected to interfere substantially with the movement of any native resident or migratory wildlife. As a result, there would be no impacts to migration and wildlife corridors.
The project site may contain suitable nesting and foraging habitat for avian species protected under the Migratory Bird Treaty Act (MBTA) and California Fish and Game Code Sections 3511 and 3513. Trees and shrubs on the project site may provide nesting habitat for migratory birds, but are unlikely to provide New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
28 habitat for raptors due to the size of the vegetation and high public use rates of the existing field and parking lot.
Implementation of the project has the potential to impact potential eggs or young of avian species covered under the MBTA and California Fish and Game Code. Potential nesting sites for migratory birds could be removed through removal of nine trees on the project site; however, trees in residential neighborhoods could provide similar suitable nesting and foraging habitat and would remain undisturbed by project construction. If work occurs during bird nesting season, implementation of Mitigation Measure BIO-1, which requires nesting bird surveys and construction modifications if active nests are identified, would ensure that potentially significant impacts to nesting birds would be less than significant.
Mitigation Measure BIO-1: The following measures shall be implemented to minimize impacts to nesting birds, as required by the Migratory Bird Treaty Act:
a. If project activities, including, but not limited to, tree removal or pruning, grubbing, and grading, are conducted during nesting bird season (February 15–September 15), the City of South San Francisco or its contractor shall conduct preconstruction nest surveys in and near the project site (within 500 feet for large raptors and 300 feet for all other birds) by a qualified biologist within 7 days of the start of construction. If nesting birds are identified during the preconstruction survey, then the City of South San Francisco shall modify the project as necessary (i.e., a no-work exclusion buffer of appropriate size [which, if implemented, shall be determined by a qualified project biologist] shall be erected around active nests) and/or delay the project as necessary to avoid impacts to the identified nests, eggs, and/or young. Disturbing active nests must be avoided until young birds have fledged.
e) Would the project conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance? Less than Significant. The 2040 General Plan Environmental and Cultural Stewardship Element37 includes policies to protect existing trees, expand the tree canopy cover, and enforce the Tree Preservation Ordinance.38 Under the City’s Tree Preservation Ordinance, protected trees may not be removed or pruned back by more than one-third without a permit. Protected trees include the following:
• Any tree of the following species with a circumference of 75 inches or more when measured 54 inches above natural grade:
o Blue gum (Eucalyptus globulus)
o Black acacia (Acacia melanoxylon)
o Myoporum (Myoporum laetum)
o Sweetgum (Liquidambar styraciflua)
o Glossy privet (Ligustrum lucidum)
o Lombardy poplar (Populus nigra)
37 City of South San Francisco. 2022b. City of South San Francisco 2040 General Plan: Environmental and Cultural Stewardship Element. Final Plan. Resolution #178-2022. Adopted October 12. Available at:
https://shapessf.com/environmental-cultural-stewardship/. Accessed May 2025. 38 City of South San Francisco. 2023. South San Francisco Code of Ordinances, Chapter 13.30. Tree Preservation. Available at:
https://ecode360.com/43447113. Accessed May 25, 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
29 • Any heritage tree of the following species with a circumference of 30 inches or more when measured at 54 inches above natural grade:
o California bay (Umbellaria californica)
o Oak (Quercus spp.)
o Cedar (Cedrus spp.)
o California buckeye (Aesculus californica)
o Catalina ironwood (Lyonothamnus floribundus var. asplenifolius) o Strawberry tree (Arbutus spp.)
o Mayten (Maytenus boaria)
o Little Gem dwarf southern magnolia (Magnolia grandiflora 'Little Gem') • Any tree other than the species listed above with a circumference of 48 inches or more when measured 54 inches above natural grade
• A tree or stand of trees so designated based upon findings that it is unique and of importance to the public due to its unusual appearance, location, or historical significance • A stand of trees whereby each tree is dependent upon the others for survival.
The project would include the removal of nine existing trees, including seven red maples (Acer rubrum), three coast live oaks (Quercus agrifolia), and one crimson bottlebrush (Callistemon citrinus), none of which meet the requirements for heritage trees. Further, the project would plant up to 30 to 35 new trees to expand the City’s tree canopy cover in compliance with the 2040 General Plan Environmental and Cultural Stewardship Element. New trees would include drought-tolerant and native species. Since the project would not remove any heritage trees and would replace the tree canopy by planting approximately 30 to 35 trees of varying species, no impacts to heritage trees would occur.
Policy CP-7.2 in the 2040 General Plan Climate Protection Element39 prioritizes expansion of the canopy cover to increase environmental benefits, including sequestering carbon dioxide, mitigating the urban heat island, improving air quality, providing traffic calming, and reducing energy use. The project would include the removal of nine trees and the planting of approximately 30 to 35 new trees. Therefore, although existing trees would be removed, over time, the lost canopy cover would be replaced as the new trees mature. The project would include the replacement of removed trees and the project would not conflict with any local policies or ordinances protecting biological resources, such as general plan policies, tree preservation policy or ordinance. Therefore, the impact would be less than significant, and mitigation is not required.
f) Would the project conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan?
No Impact. There are no Habitat Conservation Plans or Natural Community Conservation Plans, or other approved local, regional, or state habitat conservation plan, that apply to the project. Therefore, no impact would occur.
39 City of South San Francisco. 2022c. City of South San Francisco 2040 General Plan: Climate Protection Element. Final Plan.
Resolution #178-2022. Adopted October 12. Available at: https://shapessf.com/climate-protection/. Accessed May 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
30 V. Cultural Resources
Environmental Issues
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
Would the project:
(a) Cause a substantial adverse change in the
significance of a historical resource pursuant to §
15064.5?
☐ ☐ ☐ ☒
(b) Cause a substantial adverse change in the
significance of an archaeological resource pursuant to
§ 15064.5?
☐ ☒ ☐ ☐
(c) Disturb any human remains, including those interred outside of dedicated cemeteries?
☐ ☒ ☐ ☐
Environmental Evaluation
The analysis is based on a cultural resources investigation and technical report40 prepared by SWCA Environmental Consultants (SWCA) archaeologists that meet the Secretary of the Interior’s Professional Qualification Standards. The cultural resources inventory included a California Historical Resources Inventory System (CHRIS) Northwest Information Center (NWIC) records search, a Sacred Lands File (SLF) search through the Native American Heritage Commission (NAHC) database, a review of historic aerials and relevant literature, and an intensive pedestrian survey for archaeological and historical resources.
a) Would the project cause a substantial adverse change in the significance of a historical resource pursuant to § 15064.5?
No Impact. The investigation for the Cultural Resources Technical Memorandum did not identify any previously recorded historical resources on the project site. A review of historic maps and aerial photographs indicated that the project area has been the subject of intense development since the early nineteenth century. A review of soils data indicates the project area lies in an area of Urban land that includes a complex assortment of artificial cutting and filling. Historical topographic maps indicate the project area was located along the 60-foot elevation contour, but elevations currently range between about 55 and 48 feet above mean sea level, suggesting that roughly 5 to 12 feet of material may have been cut and removed from the former land surface. No cultural or historical resources were observed during an intensive survey of the project area conducted by an SWCA archaeologist in April 2025. Therefore, the project would have no impact on cultural or historical resources. b) Would the project cause a substantial adverse change in the significance of an archaeological resource pursuant to § 15064.5?
Less than Significant with Mitigation Incorporated. No archaeological resources, artifacts, or features were observed within the project area during the intensive survey. The disturbed nature of 616 Linden Avenue and the section of Pine Avenue, as well as the grading, remediation, and various periods of development, suggest that the overall archaeological sensitivity for this portion of the project area is low. 40 SWCA Environmental Consultants (SWCA). Cultural Resources Inventory Report for the South San Francisco Linden/Pine Avenues Park Project, South San Francisco, San Mateo County, California. Prepared for City of South San Francisco. SWCA Environmental Consultants, Half Moon Bay, California. August.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
31 However, prior testing for petroleum hydrocarbons and lead at 616 Linden Avenue revealed the presence of a buried concrete structure on the southern edge of the parcel, which was interpreted as a basementlevel room of the former residence, and which may have served as a utility, furnace, or storage space. The City has indicated that while soil remediation will occur within the concrete structure, the structure will be left in place and not demolished or removed.
The grassy field at 700 Linden Avenue retains a higher level of sensitivity because it does not appear to have been impacted by development or grading activities. It is possible that unknown archaeological resources are extant within the project area, and these resources have the potential to be impacted during the construction of the project, particularly during ground-disturbing activities. However, any project impacts to unknown archaeological resources can be mitigated to a less-than-significant level with implementation of Mitigation Measures CUL-1, CUL-2, and CUL-3.
Mitigation Measure CUL-1: The following measure shall be implemented prior to construction to provide methods and protocols for archaeological monitoring:
a. Prior to the start of construction, a qualified archaeologist should prepare a brief Archaeological Monitoring Plan targeted at identifying any potential remaining subsurface. This report should include, at a minimum, a project description, regulatory context, monitoring areas, frequency of monitoring, procedures to follow if cultural resources are encountered when an archaeologist is on-site and when an archaeologist is not on-site, and procedures for reducing monitoring level of effort, if warranted.
Mitigation Measure CUL-2: The following measures shall be implemented in the event that unanticipated cultural resources are exposed during project construction:
a. In the event that unanticipated cultural resources are exposed during disturbance activities, the City of South San Francisco or its contractor shall stop work within 15 meters (50 feet) of the find and an archaeologist that meets the Secretary of the Interior’s qualifications must be notified immediately. Work may not resume until a qualified archaeologist can evaluate the significance of the find. Disturbance activities may continue in other areas. If the discovery proves significant, additional work such as archaeological testing, data recovery, or consultation with stakeholdersas determined by the qualified archaeologist may be warranted.
c) Would the project disturb any human remains, including those interred outside of dedicated cemeteries?
Less than Significant with Mitigation Incorporated. There are no known cemeteries or burial sites in the project area. There is a low potential to encounter intact buried human remains within the project area.
It is possible that unanticipated human remains are extant within the project area, which have the potential to be impacted during the construction of the project, particularly during ground-disturbing activities.
However, any project impacts to unknown human remains can be mitigated to a less-than-significant level by following the discovery of human remains procedures noted below in Mitigation Measure CUL-3.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
32 Mitigation Measure CUL-3: The following measures shall be implemented in the event that human remains are exposed during project construction:
a. If human remains are encountered, the City of South San Francisco or its contractor shall follow the procedures outlined by the Native American Heritage Commission (NAHC), in
accordance with California Health and Safety Code Section 7050.5 and Public Resources Code Section 5097.98, and an archaeologist that meets the Secretary of the Interior’s qualifications must be notified immediately. If the archaeologist determines that a discovery includes human remains:
1. All ground-disturbing work within the immediate
vicinity (25 feet) of the find would halt.
2. The archaeologist would contact the County of San
Mateo (County) Coroner:
County of San Mateo Coroner
50 Tower Road
San Mateo, California 94402
Phone: (650) 312-5562
Web: https://www.smcgov.org/coroner
3. The County Coroner would also notify the NAHC:
Native American Heritage Commission
915 Capitol Mall, Room 364
Sacramento, California 95814
Phone: (916) 373-3710
Email: [email protected]
The County Coroner would have 2 working days to
examine the remains after being notified in accordance
with California Health and Safety Code Section 7050.5.
If the County Coroner determines that the remains are
Native American and are not subject to the County
Coroner’s authority, the County Coroner has 24 hours to notify the NAHC of the discovery.
4. The NAHC would immediately designate and notify the
Native American Most Likely Descendant (MLD), who
will have 48 hours after being granted access to the
location of the remains to inspect them and provide
recommendations for the treatment of them.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
33 VI. Energy
Environmental Issues
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
Would the project:
(a) Result in a potentially significant environmental
impact due to wasteful, inefficient, or unnecessary
consumption of energy resources, during project
construction or operation?
☐ ☐ ☒ ☐
(b) Conflict with or obstruct a state or local plan for renewable energy or energy efficiency?
☐ ☐ ☒ ☐
Environmental Evaluation
a) Would the project result in a potentially significant environmental impact due to wasteful, inefficient, or unnecessary consumption of energy resources, during project construction or operation?
Less than Significant. The City adopted the City of South San Francisco Climate Action Plan (CAP) in 2022.
41 The CAP identifies strategies and actions to reduce GHG emissions and achieve carbon neutrality by 2045. Through the CAP, the City implements GHG reduction measures at both City-owned facilities and at private developments, including, but not limited to, energy-efficient new construction, all-electric building design for new developments, installation of solar facilities at City buildings, implementation of landscape water requirements, use of high-efficiency water fixtures, expansion of the tree canopy, implementation of a Travel Demand Management (TDM) program, and installation of electric vehicle (EV) charging stations at City facilities.
The proposed project would involve the construction of a new park, including a plaza with a performance venue, play areas, lawns, and various landscaping and hardscape. During construction, energy consumption would be associated with primarily diesel and gasoline fuel consumption for the operation of construction equipment and for worker vehicle and haul trips. During operations, energy consumption would be limited to outdoor exterior and landscape lighting and landscape irrigation. No natural gas is planned for consumption. The consumption of energy resources during construction would be temporary and the installation of a new and energy-efficient lighting would meet City requirements for energy efficiency. Therefore, implementation of the project would not result in potentially short- or long-term significant impacts due to wasteful, inefficient, or unnecessary consumption of energy resources. While construction activities would involve diesel and gasoline fuel use for equipment and haul and commuter trips, overall consumption would be minimal and temporary, lasting approximately 8 to 10 months.
Therefore, this impact would be less than significant, and mitigation is not required. b) Would the project conflict with or obstruct a state or local plan for renewable energy or energy efficiency?
Less than Significant. The proposed park is considered a new development. The City’s CAP has goals for new development that include providing on-site solar and batteries when feasible; constructing allelectric buildings; exceeding mandatory energy efficiency requirements by 20% or more; providing EV 41 City of South San Francisco. 2022d. City of South San Francisco Climate Action Plan. Adopted October 12. Available at:
https://shapessf.com/wp-content/uploads/2022/03/SSFCAP_PublicDraft2022_02_Small.pdf. Accessed May 2, 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
34 charging stations at municipal facilities; enhancing bicycle, transit, and pedestrian connectivity; implementing mandatory organics and food waste diversion; using water-efficient landscaping and highefficiency water fixtures; expanding tree canopy cover; requiring all new municipal buildings and facilities to meet minimum Leadership in Energy and Environmental Design (LEED) silver standards; and requiring municipal projects to achieve 75% waste diversion from landfill.
The proposed project is consistent with the City’s CAP. The new restroom facility would meet or exceed energy efficiency requirements and would be all-electric. The project does not include an EV charging station but does include new bicycle racks, water-efficient landscaping, and high-efficiency water fixtures. Proposed building materials and mechanical equipment would include energy-efficient glazing, insulation, and energy-efficient models. At least 75% of asphalt or concrete removed during construction would be recycled. The project would also be consistent with all state plans for energy efficiency, including the Scoping Plan for Achieving Carbon Neutrality (2022 Scoping Plan Update),42 State of California Energy Plan, California Renewables Portfolio Standard Program, Clean Energy and Pollution Reduction Act of 2015, State Alternative Fuels Plan, and California Green Building Standards Code (CALGreen; 24 CCR Part 11), the first-in-the-nation mandatory green building standards code. For these reasons, the project would not conflict with a state or local plan for renewable energy or energy efficiency. Therefore, this impact would be less than significant, and mitigation is not required.
VII. Geology and Soils
Environmental Issues
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
Would the project:
(a) Directly or indirectly cause potential substantial
adverse effects, including the risk of loss, injury, or death involving:
(i) Rupture of a known earthquake fault, as
delineated on the most recent Alquist-Priolo
Earthquake Fault Zoning Map issued by the
State Geologist for the area or based on other
substantial evidence of a known fault? Refer to
Division of Mines and Geology Special
Publication 42.
☐ ☐ ☒ ☐
(ii) Strong seismic ground shaking? ☐ ☐ ☒ ☐
(iii) Seismic-related ground failure, including
liquefaction? ☐ ☒ ☐ ☐
(iv) Landslides? ☐ ☐ ☐ ☒
(b) Result in substantial soil erosion or the loss of
topsoil? ☐ ☐ ☒ ☐
(c) Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the
project, and potentially result in on- or off-site
landslide, lateral spreading, subsidence, liquefaction
or collapse?
☐ ☒ ☐ ☐
42 California Air Resources Board (CARB). 2022. 2022 Scoping Plan Documents. Available at: https://ww2.arb.ca.gov/ourwork/programs/ab-32-climate-change-scoping-plan/2022-scoping-plan-documents. Accessed June 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
35 Environmental Issues
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
(d) Be located on expansive soil, as defined in Table
18-1-B of the Uniform Building Code (1994), creating
substantial direct or indirect risks to life or property? ☐ ☐ ☒ ☐
(e) Have soils incapable of adequately supporting the use of septic tanks or alternative waste water disposal
systems where sewers are not available for the
disposal of waste water?
☐ ☐ ☐ ☒
(f) Directly or indirectly destroy a unique paleontological resource or site or unique geologic feature? ☐ ☒ ☐ ☐
Environmental Evaluation
a) Would the project directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving:
The analysis in this section is based on the geotechnical evaluation prepared for the project, which includes seismic hazards (liquefaction, lateral spreading, subsidence), compressible soils, expansive soils, and corrosive soils (Appendix D).43
a-i) Rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on other substantial evidence of a known fault? Refer to Division of Mines and Geology Special Publication 42.
Less than Significant. The project site is located approximately 3 miles northeast of the San Andreas Fault Zone and is not located in a designated Alquist-Priolo Earthquake Fault Zone. 44 Therefore, while the
project site is in a known seismic area and would likely be subject to earthquakes, the likelihood of surface faulting or ground rupture is considered low, and it would not be likely to be subject to surface rupture from a known earthquake fault. Therefore, potential impacts related to surface rupture from earthquake activity are less than significant, and mitigation is not required. a-ii) Strong seismic ground shaking?
Less than Significant. The project site is located approximately 3 miles northeast of the San Andreas Fault Zone, 11 miles northeast of the Seal Cove Fault-San Gregorio Fault Zone, and 15 miles southwest of the Hayward Fault Zone, in one of the most seismically active regions in the state. The San Andreas Fault has produced earthquakes of an estimated magnitude between 7.7 and 8.3 in 1906 and 6.9 in 43 Ninyo & Moore. 2023. Geotechnical Evaluation, Linden Avenue Park, 616 Linden Avenue and 270 Pine Avenue, South San Francisco. July.
44 California Geological Survey. 2025. Earthquake Zones of Required Investigation. California Department of Conservation California Geological Survey. Available at: https://maps.conservation.ca.gov/cgs/informationwarehouse/eqzapp/. Accessed March 6, 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
36 1989.
45,46 The 1908 quake produced shaking on the Modified Mercalli Intensity Scale of between VII and IX, which was strong enough to cause significant damage to structures around the peninsula. 47 The design and construction of the project is required to comply with the building codes related to seismic risk such as the 2022 California Building Code (CBC) and the South San Francisco Municipal Code, which incorporates the International Building Code. The City would be required to submit a soils report in order to obtain a building permit from the City Economic and Community Development Department, Building Division, which would ensure that project plans and specifications comply with the CBC and local amendments to the code, where applicable.48 Among many seismic requirements, the CBC requires foundations and structures to be designed and constructed to withstand the ground motions (i.e., peak ground accelerations [g]) that have a 10% chance of being exceeded in 50 years (equivalent to a 1/475 annual chance of being exceeded). Therefore, compliance with CBC requirements would result in a less-than-significant impact due to strong seismic ground shaking, and mitigation is not required. a-iii) Seismic-related ground failure, including liquefaction? Less than Significant with Mitigation Incorporated. The geotechnical evaluation analyzed the potential for liquefaction from a magnitude 7.81 earthquake producing a peak ground acceleration (PGA) of 0.99 gravity (g). Peak ground acceleration is a measure of how hard the ground shakes at a given point.
A PGA of 0.99g is correlated to an intensity of IX on the Modified Mercalli Scale, which would produce violent perceived ground shaking and heavy damage to man-made structures. The project site is not in a liquefaction hazard zone identified by the State Geologist.49 The geotechnical evaluation included four borings 15 feet deep and did not encounter groundwater but assumed that groundwater may rise to a higher level due to seasonal precipitation. Soils identified in the borings were primarily moist, firm to very stiff lean clay and medium dense to dense, silty and clayey sand. Soils prone to liquefaction are generally loose sandy soils.
The project site is not located within a liquefaction-susceptible zone. Based on the results of the geotechnical evaluation, the project would have the potential for ground shaking; however, it would be unlikely to experience liquefaction-induced ground settlement and sand-boil-induced ground subsidence.
However, because of the potential level of ground shaking, impacts related to ground failure would be potentially significant. Engineering recommendations include a review of plans and specifications by a geotechnical consultant and soil monitoring by a geotechnical engineer. Evaluations performed by the geotechnical consultant during grading and excavation may result in new recommendations than those provided in the geotechnical evaluation if different soil conditions are discovered, and proposed Mitigation Measure GEO-1 would minimize risks to life and property from seismic-related hazards.
Therefore, this impact would be less than significant with mitigation incorporated. 45 U.S. Geological Survey (USGS). 2025. Earthquake Hazards Program: The Great San Francisco Earthquake. Available at:
https://earthquake.usgs.gov/earthquakes/events/1906calif/18april/. Accessed June 2, 2025. 46 U.S. Geological Survey (USGS). 2019. Earthquake Hazards Program: M6.9 October 17, 1989 Loma Prieta Earthquake.
October 8. Available at: https://www.usgs.gov/programs/earthquake-hazards/science/m69-october-17-1989-loma-prietaearthquake. Accessed June 2, 2025. 47 USGS, 2025.
48 City of South San Francisco. 2025b. Plan Submittal and Permit Requirements. City of South San Francisco Building Division.
Available at: https://www.ssf.net/Departments/Economic-and-Community-Development/Divisions/Building-Division/PlanSubmittal-Permit-Requirements. Accessed June 2, 2025. 49 California Geological Survey. 2025. Earthquake Zones of Required Investigation. California Department of Conservation California Geological Survey. Available at: https://maps.conservation.ca.gov/cgs/informationwarehouse/eqzapp/. Accessed March 6, 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
37 Implementation of Mitigation Measure GEO-1, in addition to the requirements of the geotechnical evaluation, would reduce impacts related to liquefaction to less than significant.
Mitigation Measure GEO-1: All earthwork and construction activities shall be monitored by a licensed engineer or professional geologist. The purpose of the monitoring is to assess soil conditions and confirm the appropriate engineered support systems are incorporated into the project design and installed correctly.
a-iv) Landslides?
No Impact. The project site is relatively flat, with elevations varying from 46 to 54 feet above mean sea level. The project site is not located in an identified landslide hazard zone, and the project would not result in impacts related to landslide hazard. Therefore, no impact would occur. b) Result in substantial soil erosion or the loss of topsoil? Less than Significant. A significant impact would occur if a project would expose large areas to the erosional effects of wind and water for a protracted period of time, resulting in substantial erosion and/or the loss of topsoil. The project site is underlain by alluvium consisting of very stiff clay, sandy clay, and medium dense to dense silty and clayey sand; much of it is paved over. The project site has a lowto-moderate erosion risk. Since the majority of the project work area is previously disturbed and essentially flat, clearing, excavation, and grading activities at the project site are unlikely to result in significant short-term erosion impacts. In addition, project construction would comply with the SMCWPPP, which would include BMPs to prevent stormwater erosion from leaving the project site. The project would also comply with the BAAD fugitive dust requirements, which would prevent dust from wind erosion from leaving the project site.
Excavation would be required for utilities, foundations, and the parking areas. The project would remove 10 cubic yards of lead contaminated soil, which would be replaced with clean soil, and would require an additional total of approximately 1,200 cubic yards of cut and 450 cubic yards of fill with 750 cubic yards of soil exported from the project site. A maximum of approximately 600 cubic yards of debris from demolition of the existing hardscape would be hauled off-site for disposal.
As required by the San Francisco RWQCB and the SMCWPPP, the project would implement BMPs to reduce erosion during construction. Since the total area of disturbance is less than 1 acre (approximately
0.80 acre), the City would not be required to implement a SWPPP for the project. However, the City would be required to comply with the SMCWPPP. The project would include BMPs to control erosion and sedimentation impacts and stabilize disturbed bare earth areas. Any bare earth areas would be reseeded prior to the end of construction. Section X, Hydrology and Water Quality, provides additional information about the SMCWPPP and RWQCB BMPs for stormwater management.
Implementation of the project would reduce the amount of impervious surface by approximately 2,750 square feet, from 19,150 to approximately 16,200 square feet. This would decrease the stormwater runoff volume and rate over existing conditions. As discussed in Impact Discussion X(a), since the project replaces more than 5,000 square feet of impervious area, it is a C.3 regulated project and includes LID stormwater measures that meet City requirements to contain and treat stormwater flow. Stormwater from the project site would flow overland to two treatment and containment areas on the project site. Overflow would discharge to a storm drain on Linden Avenue and enter the City’s stormwater collection system.
Stormwater runoff would be directed into new vegetated bioretention planters and/or underground Silva Cells, which would provide biotreatment of stormwater before it enters the storm drain; this biotreatment would meet the requirements of the C.3 program. All disturbed areas would be reseeded and/or New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
38 landscaped prior to the end of construction. The new drainage and treatment system would be adequate to handle the volume of stormwater from approximately 0.37 acre of impervious surface area. Therefore, impacts resulting from water-related erosion would be less than significant, and mitigation is not required. c) Would the project be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project, and potentially result in onor off-site landslide, lateral spreading, subsidence, liquefaction or collapse? Less than Significant with Mitigation Incorporated. The project site is not located in an area subject to liquefaction or landslide.
50 As discussed above, the City has completed a geotechnical evaluation and would be required to submit a soils report that complies with the CBC. As stated above, 2022 CBC and standard geotechnical engineering practice requires identification of seismic design parameters to inform all earthwork requirements, foundation designs, and concrete/building material specifications. Design and construction of the project in accordance with the CBC and the recommendations in the geotechnical evaluation, along with implementation of Mitigation Measure GEO-1, would be sufficient to ensure public exposure to risks related to seismic-induced ground failure would remain minimal. Therefore, this impact would be less than significant with mitigation incorporated. d) Would the project be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code (1994), creating substantial direct or indirect risks to life or property?
Less than Significant. The geotechnical evaluation determined that the expansion index of the soils on the project site had low expansion potential. There are no substantial direct or indirect risks to life or property as the expansion index of the soils on the project site had low expansion potential. The risk related to expansive soils is relatively low. Therefore, this impact would be less than significant, and mitigation is not required.
e) Would the project have soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal of wastewater?
No Impact. The project would not include septic systems or alternative wastewater disposal systems.
Therefore, no impact would occur.
f) Would the project directly or indirectly destroy a unique paleontological resource or site or unique geologic feature?
Less than Significant with Mitigation Incorporated. While the majority of the project site has been previously disturbed as a street and parking lot, ground disturbance and excavation to approximately 5 feet below ground surface within the project area would occur during construction. Excavation could potentially uncover unique paleontological resources or geologic features. Based on the results of borings in other parts of the city, the likelihood of encountering unique paleontological resources or geologic features is low; however, the potential for uncovering such resources during excavation remains.
Mitigation Measure CUL-1, CUL-2, and CUL-3 requires that if historic or cultural resources are encountered during site grading or excavation activities, all work shall be halted within 100 feet of the discovery area and the contractor shall notify the City. The implementation of this mitigation measure 50 California Geological Survey. 2025. Earthquake Zones of Required Investigation. California Department of Conservation California Geological Survey. Available at: https://maps.conservation.ca.gov/cgs/informationwarehouse/eqzapp/. Accessed June 2, 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
39 also applies to paleontological resources and geologic features, thereby minimizing potential impacts to such resources. Therefore, impacts to unique paleontological resources or unique geologic features would be less than significant with mitigation incorporated.
VIII. Greenhouse Gas Emissions
Environmental Issues
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
Would the project:
(a) Generate greenhouse gas emissions, either directly
or indirectly, that may have a significant impact on the environment?
☐ ☐ ☒ ☐
(b) Conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of
greenhouse gases?
☐ ☐ ☒ ☐
Environmental Evaluation
State CEQA Guidelines Section 15064.4 recommends that lead agencies quantify GHG emissions for projects and consider several other factors that may be used in the determination of significance of project-related GHG emissions, including the extent to which the project may increase or reduce GHG emissions, whether the project exceeds an applicable significant threshold, and the extent to which the project complies with the regulations or requirements adopted to implement a reduction or mitigation of GHG.
State CEQA Guidelines Section 15064.4 does not establish a threshold of significance. Lead agencies have the discretion to establish significance thresholds for their respective jurisdictions, and in establishing those thresholds, a lead agency may appropriately look at thresholds developed by other public agencies, or suggested by other experts, such as the California Air Pollution Control Officers Association (CAPCOA), as long as any threshold chosen is supported by substantial evidence (see State CEQA Guidelines Section 15064.7(c)). The State CEQA Guidelines also clarify that the events of GHG emissions are cumulative and should be analyzed in the context of CEQA’s requirements for cumulative impact analysis (see Section 15130(f)). It is noted that the State CEQA Guidelines were amended in response to Senate Bill (SB) 97, in particular, to specify that compliance with the GHG emissions reduction plan renders a cumulative impact less than significant.
Per State CEQA Guidelines Section 15064(h)(3), a project’s incremental contribution to a cumulative impact is not necessarily cumulatively considerable if the project would comply with an approved plan or mitigation program that provides specific requirements that would avoid or substantially lessen the cumulative problem within the geographic area of the project. To qualify, such plans or programs must be specified in law or adopted by the public agency with jurisdiction over the affected resources through a public review process to implement, interpret, or make specific the law enforced or administered by the public agency. Examples of such programs include “water quality control plan, air quality attainment or maintenance plan, integrated waste management plan, habitat conservation plan, natural community conservation plans [and] plans or regulations for the reduction of greenhouse gas emissions” (Section 15064(h)(3)). Put another way, State CEQA Guidelines Section 15064(h)(3) allows a lead agency to make a finding of less than significant for GHG emissions if a project complies with adopted programs, plans, policies, and/or other regulatory strategies to reduce GHG emissions.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
40 Although GHG emissions can be quantified, the CARB, BAAD, and City have not adopted quantitative project-level significance thresholds for GHG emissions that would be applicable to the project. Per State CEQA Guidelines Section 15064.4(b), “in determining the significance of a project’s greenhouse gas emissions, the lead agency should focus its analysis on the reasonably foreseeable incremental contribution of the project's emissions to the effects of climate change. A project’s incremental contribution may be cumulatively considerable even if it appears relatively small compared to statewide, national or global emissions.” When determining the significance of GHG impacts, lead agencies should consider the project’s impact as compared to the existing environmental setting, whether the project exceeds a threshold of significance, and compliance with relevant GHG-related plans (see, for example, Section 15064.4(b)). Regarding the latter criterion, lead agencies should consider “the extent to which the project complies with regulations or requirements adopted to implement a statewide, regional, or local plan for the reduction or mitigation of greenhouse gas emissions (see, for example, Section 15183.5(b)).
Per State CEQA Guidelines Section 15064.4(b)(3), such requirements must be adopted by the relevant public agency through a public review process and must reduce or mitigate the project’s incremental contribution of GHG emissions.
For the project, no quantitative threshold has been adopted to evaluate significance for GHG emissions to address the State’s more recent GHG-reduction target of achieving carbon neutrality by 2045, per Executive Order B-55-18 (2018). To achieve carbon neutrality by 2045, it is recommended that future development include measures to support building decarbonization, including the replacement of natural gas service with other alternatives, such as use of electrically-powered equipment.51,52 Based on recent GHG threshold updates and supportive documentation prepared by the BAAD, it is recommended that future development prohibit the installation of natural gas infrastructure/use of natural-gas fired appliances, to the maximum extent possible, and incorporate electric-vehicle charging stations beyond what is required by current building standards in order to contribute its “fair share” of what would be required for the State to achieve its carbon neutrality goal.53 As a result, project-generated GHG emissions would also be considered to have a potentially significant impact if the project would not prohibit the installation of natural gas-fired appliances/equipment, to the maximum extent possible, or encourage the installation of EV charging stations beyond what is required by current building standards. As an additional significance criterion, consistency with the applicable plans and policies to reduce GHG emissions, including the emissions reduction policies, strategies, and measures discussed within CARB’s 2022 Scoping Plan Update,54 was additionally evaluated.
GHGs—including carbon dioxide (CO₂), methane (CH₄), and nitrous oxide (N₂O)—trap heat in the atmosphere and occur both naturally and from human activities such as fossil fuel combustion. Carbon is the most abundant GHG. Other GHGs are less abundant but have higher global warming potential than CO2. Thus, emissions of other GHGs are frequently expressed in the equivalent mass of CO2, denoted as carbon dioxide equivalent (CO2e). While GHGs are not considered toxic or hazardous at typical ambient concentrations, they are subject to reporting and permitting thresholds under applicable federal regulations. There are currently no national ambient air quality standards (NAAQS) or specific ambient air quality standards for GHGs under the Clean Air Act. 51 California Air Resources Board (CARB). 2022. 2022 Scoping Plan Documents. Available at: https://ww2.arb.ca.gov/ourwork/programs/ab-32-climate-change-scoping-plan/2022-scoping-plan-documents. Accessed July 2025. 52 California Energy Commission (CEC). 2021. California Building Decarbonization Assessment. Available at:
https://www.energy.ca.gov/publications/2021/california-building-decarbonization-assessment. Accessed July 2025. 53 Bay Area Air Quality Management District (BAAQMD). 2022. California Environmental Quality Act Air Quality Guidelines.
April. Available at: https://www.baaqmd.gov/?sc_itemid=CDA5FAE5-BBDC-4337-A10C-5648BCD2D71F. Accessed May 2025.
54 CARB, 2022.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
41 a) Would the project generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment? Less than Significant. The proposed project is in the San Francisco Bay Area Air Basin, which is regulated by the BAAD. Projects generate GHG emissions during construction and operation (e.g., mobile emissions, emissions from generation of electricity for operations), and projects must be consistent with a local GHG reduction strategy that meets the criteria under State CEQA Guidelines Section 15183.5(b). On April 20, 2022, the BAAD adopted changes to its thresholds for evaluating the significance of climate impacts from land use projects and plans under CEQA. In place of numerical thresholds, the focus will be on the design of a project as well as building operations and transportation.
At a minimum, building projects cannot include natural gas appliances or natural gas plumbing and cannot result in any wasteful, inefficient, or unnecessary energy usage as determined by the analysis required under CEQA Section 21100(b)(3) and State CEQA Guidelines Section 15126.2(b). The project will not utilize natural gas or result in any wasteful, inefficient, or unnecessary energy usage.
The project operations must also achieve a reduction in project-generated vehicle miles traveled (VMT) below the regional average consistent with the current version of CARB’s 2022 Scoping Plan Update or meet a locally adopted VMT target. The project would place a neighborhood park within walking distance in this densely populated part of the city, decreasing the need for residents to drive to a park. Therefore, the project would not significantly increase parking in the neighborhood, as many park visitors will be within walking distance, and the project would be likely to decrease VMT. The project will be consistent with local GHG reduction strategies meeting the criteria under State CEQA Guidelines Section 15183.5(b). Therefore, construction- and operation-related GHG emissions would be less than significant, and mitigation is not required.
Construction of the project would result in GHG emissions, which are primarily associated with use of off-road construction equipment, on-road vendor trucks, and worker vehicles. The BAAD does not have current GHG significance thresholds; however, construction emissions were calculated and amortized over a 30-year project lifetime. CalEEMod was used to calculate the annual GHG emissions based on the construction scenario described. Construction of the project is anticipated to last a total of approximately 10 months. On-site sources of GHG emissions include off-road equipment, and off-site sources include vendor trucks and worker vehicles. Table 3-5, Estimated Project Annual Construction Greenhouse Gas Emissions, presents construction emissions for the project from on- and off-site emission sources.
Table 3-5. Estimated Project Annual Construction Greenhouse Gas Emissions Construction Year
Metric Tons per Year
CO2 CH4 N2O CO2e
2026 544.95 0.040 0.034 556.26
Total 556.26
Amortized construction emissions 19
Source: CAPCOA (2022)55 (see Appendix C).
As shown in Table 3-5, the estimated total GHG emissions during construction would be approximately 556 metric tons of CO2e (MTCO2e) over the construction period. Estimated project-generated construction emissions amortized over 30 years would be approximately 19 MTCO2e per year. As with 55 California Air Pollution Control Officers Association (CAPCOA). 2022. California Emissions Estimator Model (CalEEMod).
Version 2022.1.1.29. Available at: https://www.caleemod.com/. Accessed June 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
42 project-generated construction criteria air pollutant emissions, GHG emissions generated during construction of the project would only occur when construction is active, lasting only for the duration of the construction period, and would not represent a long-term source of GHG emissions.
Operation of the project would generate GHG emissions through motor vehicle trips to and from the project site, landscape maintenance equipment operation, energy use, solid waste disposal, and generation of electricity associated with water supply, treatment, and distribution and wastewater treatment.
CalEEMod was used to calculate the annual GHG emissions based on the operational assumptions presented in Appendix C.
The estimated operational project-generated GHG emissions from area sources, energy usage, mobile sources, waste generation, water usage, wastewater generation, and vegetation are shown in Table 3-6, Estimated Annual Operational Greenhouse Gas Emissions.
Table 3-6. Estimated Annual Operational Greenhouse Gas Emissions Emission Source
CO2 CH4 N2O CO2e
Metric Tons per Year
Mobile 225.11 0.009 0.0081 228.02
Area 0 0 0 0
Energy 0.54 8.74E-05 0.00001 0.55
Water 1.514E-06 2.45 2.97 1.529E-06
Waste 6.60E-03 0.0007 0 0.02
Vegetation -2.10 N/A N/A -2.10
Total 223.55 0.0095 0.0081 226.48
Amortized construction emissions 19
Total operational + amortized construction GHGs 245.48
Source: CAPCOA (2022)56 (see Appendix C).
Note: N/A = not applicable. These emissions reflect operational year 2028. Totals do not always equal the sum of the individual numbers due to rounding.
As shown in Table 3-6, estimated annual project-generated GHG emissions would be approximately 226 MTCO2e per year as a result of project operations only. After summing up the amortized project construction emissions, total GHGs generated by the project would be approximately 245.48 MTCO2e per year. In summary, this impact would be less than significant, and mitigation is not required. b) Would the project conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of greenhouse gases? Less than Significant. The City of South San Francisco Climate Action Plan (CAP) was approved and adopted as part of a comprehensive list of the Master Plans for the City. 57 The CAP lays out strategies and
actions to achieve carbon neutrality by 2045 by increasing waste diversion, reducing energy and water use, and increasing resiliency across multiple sectors. The project is a City park with several water and energy efficiency features. In addition, The Parks and Recreation Master Plan, South San Francisco Downtown Station Area Specific Plan, and 2040 General Plan identify the neighborhoods surrounding the 56 California Air Pollution Control Officers Association (CAPCOA). 2022. California Emissions Estimator Model (CalEEMod).
Version 2022.1.1.29. Available at: https://www.caleemod.com/. Accessed June 2025. 57 City of South San Francisco. 2022. City of South San Francisco Climate Action Plan. Available at: https://shapessf.com/wpcontent/uploads/2022/03/SSFCAP_PublicDraft2022_02_Small.pdf. Accessed June 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
43 project site—the Downtown Subarea and Linden Neighborhood Center—as areas of concern for their lack of parks and open space with Goal 2 of the Parks and Recreation Master Plan, including that “every South San Francisco resident should be within a 5-minute walk of a park, trail or open space.” 58 The
project would be within 0.25 mile of neighborhoods that are not currently within a 5-minute walking distance, including neighborhoods on Hawthorne Place, Maple Avenue, and Spruce Avenue to the northwest and on Lux Avenue and Miller Avenue to the south. Therefore, the project would not conflict with the policies, regulations, or guidelines in the City’s 2040 General Plan, the City’s CAP, the BAAD’s 2017 Clean Air Plan, or any other applicable plans and/or regulations adopted for the purposes of reducing GHG emissions. Furthermore, GHG emissions from the project, as shown in Table 3-5, Estimated Project Annual Construction Greenhouse Gas Emissions; Table 3-6, Estimated Annual Operational Greenhouse Gas Emissions; and Appendix C, would not generate substantial GHG emissions during construction or operation. Therefore, this impact would be less than significant, and mitigation is not required.
IX. Hazards and Hazardous Materials
Environmental Issues
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
Would the project:
(a) Create a significant hazard to the public or the
environment through the routine transport, use, or
disposal of hazardous materials?
☐ ☒ ☐ ☐
(b) Create a significant hazard to the public or the
environment through reasonably foreseeable upset
and accident conditions involving the release of
hazardous materials into the environment?
☐ ☐ ☒ ☐
(c) Emit hazardous emissions or handle hazardous or
acutely hazardous materials, substances, or waste
within one-quarter mile of an existing or proposed
school?
☐ ☐ ☒ ☐
(d) Be located on a site which is included on a list of hazardous materials sites compiled pursuant to
Government Code Section 65962.5 and, as a result,
would it create a significant hazard to the public or the environment?
☐ ☒ ☐ ☐
(e) For a project located within an airport land use plan or, where such a plan has not been adopted, within
two miles of a public airport or public use airport,
would the project result in a safety hazard or
excessive noise for people residing or working in the
project area?
☐ ☐ ☐ ☒
(f) Impair implementation of or physically interfere with an adopted emergency response plan or emergency
evacuation plan?
☐ ☐ ☒ ☐
(g) Expose people or structures, either directly or
indirectly, to a significant risk of loss, injury or death involving wildland fires?
☐ ☐ ☐ ☒
58 City of South San Francisco. 2015b. City of South San Francisco Parks and Recreation Master Plan. Adopted July 22.
Available at: https://www.ssf.net/Departments/Parks-Recreation/About-Us/Parks-and-Recreation-Master-Plan. Accessed June 12, 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
44 Environmental Evaluation
a) Would the project create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials? Less than Significant with Mitigation Incorporated. A significant impact may occur if a project would involve the use or disposal of hazardous materials as part of its routine operations or would have the potential to generate toxic or otherwise hazardous emissions that could adversely affect sensitive receptors.
The County Health Department Environmental Health Services Division is responsible for hazardous waste management, restaurant inspections, housing inspections, medical waste disposal, water protection, water quality monitoring, and pollution prevention in San Mateo County.59 There are two divisions with jurisdiction over the project area.
The Unified Hazardous Waste and Hazardous Materials Management Regulatory Program (Unified Program) was established in 1993 to protect public health and safety through an effective and efficient implementation of the Unified Program. County Environmental Health Services was designated by the State Secretary for Environmental Protection as the Certified Unified Program Agency (CUPA) for San Mateo County in 1996.60
The Groundwater Protection Program protects underground water supplies and surface waters, such as the creeks, streams, ocean, and Bay, from chemical pollution. This division oversees clean-up of pollution caused by leaking underground tanks and chemical spills and works with other agencies, such as the EPA and RWQCBs, to ensure the clean-up process follows state and local laws.61 Construction
Construction of the project would involve the transport, use, and disposal of potentially hazardous materials, including paints, adhesives, surface coatings, cleaning agents, fuels, and oils that are typically associated with development of any construction project. As described in Section 2, Project Description, construction activities would be temporary, lasting approximately 8 months. These temporary construction activities involving the use, transport, storage, and disposal of hazardous materials, would be conducted in compliance with all health and safety requirements, such as County and 2040 General Plan policies, CCR Sections 337 through 340, Chapter 6.95 of California Health and Safety Code Article 1, and 19 CCR Division 2 (if required). Because the City and contractor would comply with applicable regulations and laws pertaining to the transport, storage, use, and disposal of potentially hazardous materials, the exposure of the public, construction workers, and environment to hazardous materials would be less than significant.
The project vicinity includes urban residential and commercial areas. Part of the project site, at 616 Linden Avenue, included an automotive repair shop that operated from the 1940s through the early 2000s.
In addition, a dry cleaners was in operation at 612 Linden Avenue between 1969 and 1974. Both businesses had underground storage tanks (UST) with the potential for leaking hydrocarbons. Extensive 59 San Mateo County Health. 2025a. Environmental Health Services. Available at: https://www.smchealth.org/eh. Accessed July 10, 2025.
60 San Mateo County Health. 2025b. Certified Uniform Program Agency. Available at: https://www.smchealth.org/hazardousmaterials-cupa. Accessed July 10, 2025. 61 San Mateo County Health. 2025c. Groundwater Protection Program. Available at: https://www.smchealth.org/gpp. Accessed July 10, 2025
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
45 environmental investigation work has been performed at 616 Linden Avenue, some of which was performed to meet regulatory requirements, and some was performed out of an abundance of caution.
A leaking UST cleanup case was opened under the oversight of the County’s Groundwater Protection Program following removal of one gasoline UST and one waste oil UST from the project site in 1993 and the detection of petroleum hydrocarbons in the soil below the USTs. Approximately 440 tons of soil were excavated and disposed of off-site following removal of the USTs to remove the petroleum hydrocarbonimpacted soil from the property. Groundwater monitoring and sampling was then conducted through January 2001 to assess the shallow groundwater for the presence of petroleum hydrocarbons. The Groundwater Protection Program confirmed that the investigation and remedial action were satisfactorily completed and closed the case in September 2001 (Appendix B5).
In order to ensure that the project site was a safe location for a park, supplemental site investigations were conducted by Toeroek Associates and Tetra Tech 2020 and 2021 (Appendices B1 and B2) and by Ninyo and Moore in 2023 and 2024 (Appendices B3–B5). Shallow soil samples were collected and analyzed for petroleum hydrocarbons and lead. The State of California has established risk-based screening levels specifically for former UST cases. Lead is commonly detected in soil, and State regulatory agencies have established toxicologically-based screening levels to assess safe lead concentrations for different property uses. The supplemental testing and evaluation of the soil data confirms that both 616 Linden Avenue and 700 Linden Avenue are acceptable for use as a park (see Appendix B5).
The Phase II Environmental Site Assessment (ESA) in 2021 (Appendix B1) and Supplemental Site Investigations in 2023 (see Appendices B3–B4) analyzed soil and soil gas samples for petroleum hydrocarbons and lead. The 2023 investigation showed levels below the RWQCB environmental screening level for direct soil contact with residential land use in all samples with one exception. Lead was detected in soil samples collected at the 616 Linden Avenue property at concentrations ranging from
10.9 to 239 milligrams per kilogram (mg/kg). The only concentration that exceeded the RWQCB environmental screening level for direct soil contact with residential land use of 80 mg/kg was from soil within the buried concrete structure (Appendix B5) and is thought to be from metal objects left in the structure that leached into the soil. The amount of lead present in the other samples is common as background levels in Bay Area soils and is not likely to be from past uses.
As a result, the project would include the removal of the lead-impacted soil from within the buried concrete structure and replace it with clean fill. This work would be part of a Site Management Plan that would describe recommended steps necessary to ensure safety of workers, residents, and park users during removal and construction. It would also describe procedures that would be followed if petroleum hydrocarbon-impacted soils were encountered during construction, although this is not expected. Further, any soils planned for off-haul to a landfill would be tested and disposed of accordingly.
In addition, construction activities would be required to comply with applicable policies, standards, and regulations to ensure there are no hazards related to the routine use, disposal, transport, or accidental release of hazardous materials (California Occupational Safety and Health Administration [Cal/OSHA] requirements, CCR Titles 8 and 22). All excavated fill and native soil material would be disposed of in accordance with applicable codes and regulations and the transport and disposal of these materials is not expected to create a significant hazard to construction workers or the nearby community. Therefore, the proposed project would not create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials and this impact would be less than significant.
Implementation of Mitigation Measures HAZ-1, HAZ-2, and HAZ-3 would further reduce this less than significant impact.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
46 Implementation of Mitigation Measures HAZ-1, HAZ-2, and HAZ-3 would reduce potentially significant impacts from exposure to soil contaminants, and elements of building debris to less-than-significant levels.
Mitigation Measure HAZ-1: The City of South San Francisco or its contractor must develop and implement a demolition debris management and disposal plan for the non-Resource Conservation and Recovery Act (RCRA) hazardous materials that are to be removed from the project site per compliance with City of South San Francisco waste diversion requirements in City of South San Francisco Code of Ordinances Sections 8.16.125 and 15.60 (100% of inert solids and at least 65% of the remaining construction and demolition debris tonnage). The plan must be designed to prevent releases of hazardous materials in quantities that could pose a risk to human health and the environment, as determined using appropriate Bay Area Air District, Regional Water Quality Control Board, California Department of Toxic Substances Control, and/or other appropriate agency screening thresholds.
Mitigation Measure HAZ-2: The construction contractor (as required by the contract specifications) shall develop a Hazardous Materials Contingency Plan (HMCP) to be approved by the City of South San Francisco that includes standard construction measures required by federal, state, and local policies for the handling of potential hazardous materials and removal of on-site debris. The HMCP shall include the implementation of a Waste Management Plan (WMP) for the management of all construction waste and a Safety Management Plan (SMP) to minimize construction worker’s exposure to dust emissions and emissions that have the potential to contain hazardous concentrations of lead and petroleum hydrocarbons.
At a minimum, this plan shall include the following requirements:
a. Soils at 616 Linden Avenue on the project site should be tested for lead and petroleum hydrocarbons prior to grading and excavation.
b. If contaminated soils or other hazardous materials are encountered during any soil-moving operation during
construction, the HMCP shall be implemented.
c. Instruct workers on recognition and reporting of materials that may be hazardous.
d. Minimize delays by continuing performance of the work in areas not affected by hazardous materials operations.
e. Identify and contact subcontractors and licensed personnel qualified to undertake storage, removal, transportation, disposal, and other remedial work required by, and in accordance with, laws and regulations.
f. Forward copies of reports, permits, receipts, and other documentation related to remedial work to the engineer. g. Notify such agencies as are required to be notified by laws and regulations within the time stipulated by such laws and regulations.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
47 h. File requests for adjustments to contract time and contract price due to the finding of hazardous materials in the work site in accordance with conditions of contract.
Mitigation Measure HAZ-3: Prior to park construction, the City of South San Francisco or its contractor will prepare a Site Management Plan (SMP) and submit it to County of San Mateo Groundwater Protection Program for review. The SMP will include procedures to remove and dispose of lead-impacted soil and describe recommended steps necessary to ensure safety of workers, residents, and park users during construction. The SMP will also describe procedures that will be followed if petroleum hydrocarbonimpacted soils are encountered during construction, although this is not expected. Further, any soils planned for off-haul to a landfill will be tested and disposed of accordingly.
Operation
The City is considering both natural and artificial turf options for the lawn areas. The lawn areas would be approximately 5,000 total square feet, which is about 13% of the total project site. The City may install artificial turf for the purpose of reducing costs, water usage, and maintenance.
Artificial turf is a synthetic surface material engineered to mimic natural grass. It is made of plastic, blade-like fibers woven into a backing, And infill material between the blades provides cushioning. Other materials under the surface may aid drainage and provide padding. Existing types of artificial turf contain a variety of plastics and chemical additives, which may include, but are not limited to, polyfluoroalkyl substances (PFASs), ortho-phthalates, colorants (green copper metallic complexes or yellow azo compounds), antioxidants to reduce weathering (phenols and organic phosphites), light stabilizers (hindered amine light stabilizers), and ultraviolet light stabilizers (zinc tinuvins, hindered amine light stabilizers).62 Some of these compounds are present on the California Department of Toxic Substances Control (DTSC) Candidate Chemicals List, an informational list of chemicals that exhibit “a hazard trait and/or an environmental or toxicological endpoint”.63
Exposure to chemicals from artificial turf may occur through inhalation of airborn particles, ingestion of microplastics, and skin absorption of additives. Artificial turf contains chemicals and heavy metals, including polycyclic aromatic hydrocarbons (PAHs), PFASs, phthalates, silica polychlorinated biphelyls (PCBs), carbon black, and metals such as lead, mercury, cadmium, chromium, cobalt, and arsenic. Human health risks from PFAs can include endocrine disruption, adverse effects on the liver and thyroid, metabolic effects, developmental effects, neurotoxicity, and immunotoxicity. Crumb rubber infill is made from used tires and can contain PAHs, phthalates, arsenic, cadmium, lead, nickel, PAHs, and volatile organic carbons. Silica, which is another common infill material, can cause a chronic lung disease called silicosis when inhaled. Resistant staph infections have also been documented from artificial turf. In addition, pesticides and biocides are used on artificial fields to reduce bacteria, viruses, and weeds.
Some potential concerns related to existing artificial turf installation include human health concerns from potential exposure to hazardous chemicals, possible release of microplastics into the water and 62 California Department of Toxic Substances Control (DTSC). 2024. Background Document on Candidate Chemicals in Artificial Turf. Available at: https://dtsc.ca.gov/wp-content/uploads/sites/31/2024/07/Background-Document-on-CandidateChemicals-in-Artificial-Turf.pdf. Accessed July 10, 2025. 63 California Department of Toxic Substances Control (DTSC). 2025.Candidate Chemical Terms. Available at:
https://dtsc.ca.gov/scp/candidate-chemical-terms/. Accessed July 10, 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
48 environment, increase in sports injuries and resistant bacterial infections, and local heat island effects.64 While there is research and literature that highlight concerns about the potential impacts of long-term exposure to the existing synthetic turf options that are currently on the market, at this time, there is no definitive conclusion identifying health impacts from exposure levels to athletes and other users.65 Local heat island effects are an acknowledged risk with artificial turf use. Turf temperatures can be significantly higher, at times 40 to 60 degrees higher than natural grass and as much as 87 degrees higher than ambient temperatures, due to their solar absorption and lack of evaporative cooling that natural grass experiences.
66 This generally could result in less comfortable conditions for users, but would not result in any hazardous environmental impacts.
Although many of these compounds are known to cause human health issues, there has not been enough research to difinitively conclude significant public health and environmental impacts would result from prolongued exposure to artificial turf. Further, the area of artificial turf that could be installed is relatively small (13%) in comparison to the total project site; users of the park would also not be confined to just lawn or turf area. Therefore, health and hazard impacts related to the use and operation of artificial turf would be less than significant, and mitigation is not required. b) Would the project create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment?
Less than Significant. A significant impact may occur if a project could create an upset or accident condition involving hazardous materials. The project is not located on a hazardous contamination site, and thus there is no reasonably foreseeable release of hazardous materials from existing hazardous contamination.27F Removal of the lead contaminated soil at 616 Linden Avenue would further reduce potential hazards. Construction of the project would use small amounts of hazardous materials, such as diesel fuel. The BMPs implemented for the SMCWPPP (discussed further in Section X, Hydrology and Water Quality) would contain minor spills during construction. The project would not create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment. Therefore, this impact would be less than significant, and mitigation is not required.
c) Would the project emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school?
Less than Significant. A project-related significant adverse effect may occur if a project site is within
0.25 mile of an existing or proposed school site, and the project is projected to release hazardous emissions that would exceed regulatory thresholds and would pose a health hazard. The closest school is Martin Elementary School, located approximately 0.25 mile northwest of the project site. Other schools in the vicinity include All Souls Catholic School and Spruce Elementary School, which are 0.31 mile west and 0.35 mile west, respectively. As discussed under Impact Discussions IX(a) and IX(b), the project would comply with applicable regulations and laws pertaining to the transport, storage, use, and disposal 64 Santa Clara County Medical Association. 2024. Recommendation to Use Natural Turf Grass on Santa Clara County Fairgrounds. March 12. Available at: https://www.sccma.org/LinkClick.aspx?fileticket=C0f6wf5p9uY%3D&portalid=19.
Accessed July 10, 2025.
65 California Department of Toxic Substances Control (DTSC). 2024. Background Document on Candidate Chemicals in Artificial Turf. August. Available at: https://dtsc.ca.gov/wp-content/uploads/sites/31/2024/07/Background-Document-onCandidate-Chemicals-in-Artificial-Turf.pdf. Accessed March 4, 2025. 66 Santa Clara County Medical Association, 2024.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
49 of potentially hazardous materials, and would not create a significant hazard to the public or the environment related to hazardous materials. The project would not handle hazardous materials in a way that would emit hazardous emissions. Therefore, this impact would be less than significant, and mitigation is not required.
d) Would the project be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment?
Less than Significant with Mitigation Incorporated. California Government Code Section 65962.5 requires various state agencies to compile lists of hazardous waste disposal facilities, unauthorized release from USTs, contaminated drinking water wells, and solid waste facilities from which there is known migration of hazardous waste, and to submit such information to the Secretary for Environmental Protection on at least an annual basis. In meeting the provisions in California Government Code Section 65962.5, commonly referred to as the “Cortese List,” database resources such as EnviroStor and GeoTracker provide information regarding identified facilities. 67,68
As discussed under Impact Discussion IX(a), 616 Linden Avenue has undergone cleanup for lead and petroleum hydrocarbon contamination. The project site has undergone cleanup and been certified as below the RWQCB environmental screening level for direct soil contact with residential land use and therefore safe for park use. As discussed in Impact Discussion IX(a), out of an excess of caution, the City will remove the soil with higher lead concentration inside the buried concrete structure.
Construction would involve excavation, grading, and the movement of soils and dust emissions from these activities, which could cause a temporary impact to the public or the environment. Short-term soil exposure would potentially affect construction workers due to the potential presence of low levels of lead and petroleum hydrocarbons. All construction activities would be required to comply with applicable policies, standards, and regulations to ensure there are no hazards related to the routine use, disposal, transport, or accidental release of hazardous materials (Cal/OSHA requirements, CCR Titles 8 and 22).
All excavated fill and native soil material would be disposed of in accordance with applicable codes and regulations, and the transport and disposal of these materials is not expected to create a significant hazard to construction workers or the nearby community. Compliance with federal and state requirements and implementation of Mitigation Measures HAZ-1, HAZ-2, and HAZ-3 would reduce potentially significant impacts from exposure to soil contaminants and elements of building debris to less-than-significant impacts on the public or the environment related to disposal of hazardous materials. Therefore, this impact would be less than significant with mitigation incorporated. e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard or excessive noise for people residing or working in the project area?
No Impact. The project site is located approximately 2 miles northeast of SFO and is within the jurisdiction of the SFO Airport Land Use Compatibility Plan (ALUCP). The project site is also located within the boundary of one subarea of Airport Influence Area B—the 14 Code of Federal Regulation 67 California Department of Toxic Substances Control (DTSC). 2025. EnviroStor. Available at:
https://www.envirostor.dtsc.ca.gov/public/map/?myaddress=south+san+francisco. Accessed June 3, 2025. 68 State Water Resources Control Board (State Water Board). 2025. GeoTracker. Available at:
https://geotracker.waterboards.ca.gov/map/?CMD=runreport&myaddress=south+san+francisco. Accessed June 3, 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
50 (CFR) Part 77 Conical Surface Area (Figure 3-1, San Francisco International Airport, Airport Influence Areas)..
69 The 14 CFR Part 77 Subpart C. Conical Surface zone establishes obstruction standards for the airspace around airports, including approach zones, conical zones, transitional zones, and horizontal zones known as “imaginary surfaces.” The Federal Aviation Administration (FAA) considers objects penetrating these surfaces as obstructions to navigation and requires marking and lighting them for avoidance. The project site is located in an area that would require clearance measures of structures between 100 and 150 feet above ground surface.70 Project structures would have a maximum height of less than 20 feet above ground surface and would not impact the conical surface zone. Therefore, no impact would occur. f) Would the project impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan? Less than Significant. A significant impact may occur if a project were to interfere with roadway operations used in conjunction with an emergency response plan or emergency evacuation plan or would generate sufficient traffic to create traffic congestion that would interfere with the execution of such a plan. During short-term construction activities, including the associated roadway improvements, partial or complete road closures may be required along both Linden Avenue, Pine Avenue, 7th Lane, and 8th Lane to accommodate utility trenching for installation of storm drains, domestic water, and fire water lines, as well as road improvements and striping. Closures would not impact individual access to other properties.
The 2040 General Plan does not identify emergency evacuation routes. Linden Avenue is identified as a collector street. During the construction phase, the City would require an encroachment permit for any temporary activities that would affect the public right-of-way. Encroachment permit conditions would include a traffic control plan with temporary procedures for emergency access. Additionally, in the event of complete or partial lane closures, sufficient alternative routes exist near the facility and the project would not interfere or result in inadequate emergency access. The project would not impair the implementation of or physically interfere with an emergency response plan or emergency evacuation plan.
Therefore, this impact would be less than significant, and mitigation is not required. g) Would the project expose people or structures, either directly or indirectly, to a significant risk of loss, injury or death involving wildland fires? No Impact. A significant impact may occur if a project is located in proximity to wildland areas and would pose a potential fire hazard, which could affect persons or structures in the area in the event of a fire. California Department of Forestry and Fire Protection (CAL FIRE) maps Fire Hazard Severity Zones (FHSZs) in State Responsibility Areas (SRAs), as well as Very High FHSZs in Local Responsibility Areas (LRAs). The project site is in an LRA and is under the jurisdiction of the South San Francisco Fire Department (SSFFD). There are no Very High FHSZs mapped in South San Francisco.71 San Bruno Mountain and the adjacent neighborhood, 0.4 mile north of the project site, is in a Moderate FHSZ in an SRA.72
69 City and County Association of Governments of San Mateo County (C/CAG). 2012. Comprehensive Airport Land Use Compatibility Plan for the Environs of San Francisco International Airport. November. Available at: https://ccag.ca.gov/wpcontent/uploads/2014/10/Consolidated_CCAG_ALUCP_November-20121.pdf. Accessed June 5, 2025. 70 C/CAG, 2012.
71 California Department of Forestry and Fire Protection (CAL FIRE). 2025. Local Responsibility Area Fire Hazard Severity Zones: City of South San Francisco – San Mateo County. Updated February 23. Available at:
https://calfire.app.box.com/s/wahuw9ny7cgn89xpxh7092ur50r1pwvj/file/1785859153686. Accessed June 3, 2025. 72 California Department of Forestry and Fire Protection (CAL FIRE). 2024. Fire Hazard Severity Zones in State Responsibility Area. Effective April 1. Available at: https://calfireforestry.maps.arcgis.com/apps/webappviewer/index.html?id=988d431a42b242b29d89597ab693d008. accessed June 3, 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
51 Figure 3-1. San Francisco International Airport, Airport Influence Areas.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
52 The project site is regularly maintained by City Parks and Recreation staff and generally lacks combustible native vegetation. The project would construct a new park, which would be landscaped, irrigated, and maintained by the City. It would not draw additional people to an area subject to wildland fires. Therefore, no impact would occur.
X. Hydrology and Water Quality
Environmental Issues
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
Would the project:
(a) Violate any water quality standards or waste
discharge requirements or otherwise substantially
degrade surface or ground water quality?
☐ ☐ ☒ ☐
(b) Substantially decrease groundwater supplies or
interfere substantially with groundwater recharge such
that the project may impede sustainable groundwater
management of the basin?
☐ ☐ ☒ ☐
(c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the
course of a stream or river or through the addition of
impervious surfaces, in a manner which would:
(i) Result in substantial erosion or siltation on- or
off-site;
☐ ☐ ☒ ☐
(ii) Substantially increase the rate or amount of
surface runoff in a manner which would result in
flooding on- or off-site;
☐ ☐ ☒ ☐
(iii) Create or contribute runoff water which would
exceed the capacity of existing or planned
stormwater drainage systems or provide
substantial additional sources of polluted runoff;
or
☐ ☐ ☒ ☐
(iv) Impede or redirect flood flows? ☐ ☐ ☐ ☒
(d) In flood hazard, tsunami, or seiche zones, risk release of pollutants due to project inundation? ☐ ☐ ☐ ☒
(e) Conflict with or obstruct implementation of a water quality control plan or sustainable groundwater
management plan?
☐ ☐ ☒ ☐
Environmental Evaluation
a) Would the project violate any water quality standards or waste discharge requirements or otherwise substantially degrade surface or ground water quality?
Less than Significant. Activities associated with construction of the project could have a significant impact if they resulted in violation of waste discharge requirements under the San Francisco Bay Region RWQCB’s Municipal Regional Stormwater National Pollutant Discharge Elimination System (NPDES) New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
53 Permit73 from contaminated runoff entering the stormwater system. Although the project site is not adjacent to any waterbodies, the closest waterbody is Colma Creek, approximately 0.6 mile southwest of the project site.
The SMCWPPP, or Flows to Bay, is a partnership of the County, the City and County Association of Governments of San Mateo County (C/CAG), and each incorporated City and Town in San Mateo County, which share a common NPDES permit. The Municipal Regional Stormwater NPDES Permit was issued by the San Francisco Bay Region RWQCB in compliance with the Water Quality Control Plan (Basin Plan) for the San Francisco Bay Basin (Basin Plan) and the NPDES Program.74,75 Participating agencies (including the County and City) must comply with the provisions of the countywide permit by ensuring that new development and redevelopment mitigate, to the maximum extent practicable, water quality impacts from stormwater runoff during both construction and operational periods of projects.76 In addition, the City is subject to the San Francisco Bay Nutrients Watershed Permit for Municipal Wastewater Discharges, which requires dischargers to reduce nitrogen and phosphorus loads in wastewater by 40% within 10 years.77
Construction
The proposed project would disturb less than 1 acre of land (approximately 0.80 acre); therefore, the City would not be required to implement a SWPPP for the project. The project would include the implementation of BMPs to prevent erosion and sedimentation of soil, as well as cement wash, asphalt, oil, and other hazardous debris from leaving the project site. A drainage control plan with site-specific BMPs that are designed to prevent runoff from construction areas would be implemented to reduce potential impacts to surface water quality during project construction. The plan would also include design elements and BMPs for construction areas, such as fueling and equipment washing areas and trash and hazardous material storage areas. No construction would occur during major rain events, minimizing any chance of runoff from the project site. Major rain events would be considered as a prediction of 0.25 inch or more in 24 hours.
As described in Section 2.6, Construction, construction would require demolition of the existing parking lot and a section of Pine Avenue; clearing and grading activities; construction of the plaza and other park facilities, a potential restroom, and a parking area; and trenching for utilities. The project would result in temporary disturbance of approximately 0.80 acre on-site, including an area for temporary staging, and would include the permanent development of approximately 0.80 acres. 73 Regional Water Quality Control Board (RWQCB). 2022. Municipal Regional Stormwater NPDES Permit. Order No. R2- 2022-0018. NPDES Permit No. CAS612008. California Regional Water Quality Control Board, San Francisco Bay Region.
May 11. Available at: https://www.waterboards.ca.gov/rwqcb2/board_decisions/adopted_orders/2022/R2-2022-0018.pdf.
Accessed June 3, 2025.
74 Regional Water Quality Control Board (RWQCB). 2024a. Water Quality Control Plan (Basin Plan) for the San Francisco Bay Basin. California Regional Water Quality Control Board, San Francisco Bay Region. March 7. Available at:
https://www.waterboards.ca.gov/sanfranciscobay/basin_planning.html. Accessed June 3, 2025 75 RWQCB, 2022.
76 County of San Mateo. 2023. San Mateo Countywide Water Pollution Prevention Program: Construction Best Practices.
Available at: https://flowstobay.org/preventing-stormwater-pollution/with-new-redevelopment/construction-best-practices/.
Accessed June 3, 2025.
77 Regional Water Quality Control Board (RWQCB). 2024b. San Francisco Bay Nutrients Watershed Permit for Municipal Wastewater Discharges. Order No. R2-2024-0013. NPDES Permit No. CA0038873. California Regional Water Quality Control Board, San Francisco Bay Region. July 10. Available at:
https://www.waterboards.ca.gov/sanfranciscobay/board_decisions/adopted_orders/2024/R2-2024-0013.pdf. Accessed June 3, 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
54 Construction activities associated with the park would require the presence of construction vehicles, heavy equipment and materials, and construction crews. Construction activity, including demolition, site grading, excavation, and construction of the new park, would result in temporary soil erosion that could temporarily affect water quality. In addition to stormwater runoff and potential resulting water quality and sedimentation impacts, there is the potential for hazardous materials, including petroleum products associated with diesel vehicle and equipment use and contaminants from paving materials, concrete mixing, pouring and washout, and sanitary facilities, to leave the project site.
Operation
Following construction, the project site would be restored and landscaped surrounding the new park, including stormwater retention and treatment areas, thereby reducing any future water quality impacts.
Approximately 807 square feet of LID treatment areas would be constructed on-site, to include biorentential planters on Linden Avenue for filtering stormwater and water runoff from the project site.
Stormwater would be directed to the existing bioretention planters on Linden Avenue before discharging to the existing storm drain in Linden Avenue (see Appendix A4). The project would be required to comply with all stormwater requirements of the State Water Resources Control Board (State Water Board) and the County and include bioretention basins and treatment areas adequate to treat runoff from the project.
The project would include installation of either natural or artificial turf in the two lawn areas, totaling approximately 5,022.5 square feet. Environmental pollutants and microplastics from both natural and synthetic turf may result in stormwater runoff impacts if not filtered and treated. Further, artificial turf breaks down over time from sunlight, heat, rain, and consistent use. Runoff from artificial turf may contain pollutants such as heavy metals, PFASs, microplastics, and other chemicals that can reach surface water and groundwater.78 The bioretention basins proposed for the project are designed to filter out most water contaminants, which would also filter out microplastics and other pollutants related to the use of natural or synthetic turf. Therefore, water quality impacts associated with the new park would be less than significant, and mitigation is not required.
b) Would the project substantially decrease groundwater supplies or interfere substantially with groundwater recharge such that the project may impede sustainable groundwater management of the basin?
Less than Significant. California Water Service Company (CalWater) provides water service to the City.
CalWater obtains the majority of its water from the San Francisco Water Department and supplies approximately 1,534 acre-feet79 per year (AFY) to the City from local groundwater wells. The project overlays the Westside Groundwater Basin (California Department of Water Resources [DWR] Basin 2-35). Municipal and agricultural groundwater wells in the basin range from depths of 130 to 825 feet.80 CalWater operates groundwater wells in the basin that serve its South San Francisco District.81 The 78 Benjamin, Chelsea. 2022. Is Artificial Turf a Beneficial Water Conservation Tool in the West? Prepared by Western Resource Advocates (WRA). December. Available at: https://westernresourceadvocates.org/wpcontent/uploads/2023/01/2022_WRA_Artifical_Turf_Report.pdf. Accessed July 10, 2025. 79 An acre-foot is a volume of water equal to a sheet of water 1 acre in area and 1 foot thick, or 43,560 cubic feet of water. 80 California Department of Water Resources (DWR). 2006. San Francisco Bay Hydrologic Region: Westside Groundwater Basin. California’s Groundwater Bulletin 118. January 20. Available at: https://water.ca.gov/-/media/DWR-Website/WebPages/Programs/Groundwater-Management/Bulletin-118/Files/2003-Basin-Descriptions/2_035_Westside.pdf. Accessed March 21, 2025.
81 California Water Service (CalWater). 2021. 2020 Urban Water Management Plan, South San Francisco District. June.
Available at: https://www.calwater.com/docs/uwmp2020/SSF_2020_UWMP_FINAL.pdf. Accessed March 21, 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
55 basin is not adjudicated and DWR has determined the Basin is not in a state of critical overdraft and is a low priority for adjudication.82
A potentially significant impact would occur if a project includes deep excavations resulting in the potential to interfere with groundwater movement, the withdrawal of groundwater, or paving of existing permeable surfaces important to groundwater recharge. The project would include excavation to a depth of 5 feet, which would not be likely to significantly impact the groundwater table or groundwater movement. Excavations for the park footings and utilities would be limited in scope but may encounter shallow groundwater, which would require dewatering during construction. However, dewatering for construction would be short term and temporary, and construction would not include excavation to depths that could affect groundwater movement or well production. Construction of the project would be unlikely to significantly impact groundwater movement. Therefore, this impact would be less than significant, and mitigation is not required.
c) Would the project substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would:
c-i) Result in substantial erosion or siltation on- or off-site? Less than Significant. Planned earthwork and grading activities on the project site would involve a maximum total cut and fill of approximately 300 cubic yards—approximately 300 cubic yards of cut would be either used as fill or removed from the project site, and no fill is expected to be imported. The project site is essentially flat, and all project components would be required to implement erosion control measures, as discussed under Impact Discussion X(a). Construction of the project would include implementation of BMPs under the State Water Board General Construction Permit and SMCWPPP.
Implementation of SMCWPPP requirements would reduce potential erosion and sedimentation from project construction to less-than-significant levels.
Assuming the use of natural turf for the lawn areas, implementation of the project would reduce the amount of impervious surface by approximately 2,950 square feet, from 19,150 to approximately 16,200 square feet. With the use of synthetic turf for the lawn areas, implementation would slightly increase the impervious surface area. In either case, the project would qualify as a C.3 regulated project under the SMCWPPP. Under the C.3 program, the project is required to incorporate controls to reduce pollutant runoff in stormwater. Most controls are required to be LID measures, which include biotreatment areas, flowthrough planters, rain barrels or cisterns, green roofs, pervious pavement, or other stormwater treatment measures designed to infiltrate or detain stormwater runoff, so that all of the runoff required to be treated per the stormwater permit soaks into the ground, is stored for irrigation or in-building use, evaporates, or is taken up by plants. These requirements apply to most projects that create and/or replace 5,000 square feet or more of impervious surface area.83 The new park would drain to two new LID treatment areas on-site, including some combination of vegetated bioretention areas, below-grade bioretention planters, and underground Silva cells (see Appendix A4 for the stormwater retention plan assuming natural turf lawn areas). The project will include the installation of a new connection to the existing bioretention basins and storm drain main on Linden 82 California Water Service (CalWater). 2021. 2020 Urban Water Management Plan, South San Francisco District. June.
Available at: https://www.calwater.com/docs/uwmp2020/SSF_2020_UWMP_FINAL.pdf. Accessed March 21, 2025. 83 County of San Mateo. 2023. San Mateo Countywide Stormwater Pollution Prevention Program: Stormwater Quality Control Requirements, Information for Developers, Builders and Project Applicants. Updated January. Available at:
https://www.flowstobay.org/wp-content/uploads/2023/04/SMCWPPP-MRP-3.0-C.3-Flyer_final.pdf. Accessed June 3, 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
56 Avenue, which ultimately outfalls to Colma Creek; therefore, the project would not substantially alter the existing drainage pattern in a manner that would cause erosion. Compliance with the Municipal Regional Stormwater Permit and City Planning Division requirements will reduce drainage and stormwater impacts to a less-than-significant level. The project would not substantially alter the existing drainage pattern of the project site resulting in substantial erosion or siltation. Therefore, this impact would be less than significant, and mitigation is not required.
c-ii) Substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or off-site?
Less than Significant. A significant impact may occur if a project results in increased runoff volumes during construction or operation of the project that would result in flooding conditions affecting the project site or nearby properties. As described in Impact Discussions X(a) and X(b), with the use of natural turf, the project would result in a decrease in impervious surface area of approximately 2,750 square feet and the construction of new vegetated stormwater basins and/or Silva cells, which would capture runoff from a 10-year, 2-hour storm event.
84 If artificial turf is used, the amount of impervious surface would slightly increase on the project site, and the stormwater retention plan would be designed and constructed to accommodate the amount of runoff. Compliance with the Municipal Regional Stormwater Permit and City Planning Division requirements would reduce drainage and stormwater impacts to a less-than-significant level. The project would not substantially alter the existing drainage pattern of the project site resulting in a substantial increase in the rate or amount of surface runoff in a manner that would result in flooding on- or off-site. Therefore, this impact would be less than significant, and mitigation is not required.
c-iii) Create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff?
Less than Significant. As described in Impact Discussions X(a) and X(b), the project would result in a decrease in impervious surface area of approximately 2,750 square feet and the construction of new vegetated stormwater bioretention basins and/or Silva cells that would have adequate capacity to contain runoff from the resulting square footage. The LID treatment areas would discharge to the stormwater system in Linden Avenue, which discharges to Colma Creek. Compliance with the Municipal Regional Stormwater Permit and City Planning Division requirements would reduce drainage and stormwater impacts to a less-than-significant level. The project would not exceed the capacity of the existing and/or planned stormwater drain system or provide substantial additional sources of polluted runoff. Therefore, this impact would be less than significant, and mitigation is not required. c-iv) Impede or redirect flood flows?
No Impact. A significant impact may occur if a project were located in a flood hazard area and would impede or redirect flood flows. According to the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map, the project site is located in an area of minimal flood hazard. 85 The project would
not impede or redirect flood flows. Therefore, no impact would occur. 84 A 10-year, 2-hour storm means a storm of 2 hours duration that is capable of producing a volume of rainfall expected to be equaled or exceeded on the average of once in 10 years. 85 Federal Emergency Management Agency (FEMA). 2012. FEMA’s National Flood Hazard Layer Viewer, South San Francisco. Available at: https://www.arcgis.com/apps/webappviewer/index.html?id=8b0adb51996444d4879338b5529aa9cd.
Accessed June 3, 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
57 d) In flood hazard, tsunami, or seiche zones, would the project risk release of pollutants due to project inundation?
No Impact. According to the FEMA Flood Insurance Rate Map, the project site is located in an area of minimal flood hazard.
86 A seiche is a standing wave that oscillates back and forth in an enclosed or partially enclosed waterbody. Seiche waves may be caused by earthquakes, and the project site is in an area with high seismic activity. The project is not located in either a seiche or a tsunami zone. Therefore, no impact from flood hazard, seiche, or tsunami inundation would occur.87 e) Would the project conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan? Less than Significant. The proposed project will abide by all requirements of the San Mateo Countywide Water Pollution Prevention Program and the Municipal Regional Permit issued by the San Francisco Bay RWQCB. The project would not conflict with the Basin Plan88 because it would comply with all applicable requirements of the MRP. The project site is not located in a groundwater basin and would not directly use groundwater; therefore, it would not conflict with or obstruct the implementation of a sustainable groundwater management plan. Therefore, this impact would be less than significant, and mitigation is not required.
XI. Land Use and Planning
Environmental Issues
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
Would the project:
(a) Physically divide an established community? ☐ ☐ ☒ ☐ (b) Cause a significant environmental impact due to a
conflict with any land use plan, policy, or regulation
adopted for the purpose of avoiding or mitigating an
environmental effect?
☐ ☐ ☒ ☐
Environmental Evaluation
a) Would the project physically divide an established community? Less than Significant. The project site is located on a parking lot and grassy field that are zoned Parks and Recreation (PR) under the 2040 General Plan and zoning code. Surrounding land uses are 86 Federal Emergency Management Agency (FEMA). 2012. FEMA’s National Flood Hazard Layer Viewer, South San Francisco. Available at: https://www.arcgis.com/apps/webappviewer/index.html?id=8b0adb51996444d4879338b5529aa9cd.
Accessed June 3, 2025.
87 California Geological Survey. 2022. San Mateo County Tsunami Hazard Areas. California Department of Conservation California Geological Survey. Available at: https://www.conservation.ca.gov/cgs/tsunami/maps/san-mateo. Accessed June 3, 2025.
88 Regional Water Quality Control Board (RWQCB). 2024. Water Quality Control Plan (Basin Plan) for the San Francisco Bay Basin. California Regional Water Quality Control Board, San Francisco Bay Region. March 7. Available at:
https://www.waterboards.ca.gov/sanfranciscobay/basin_planning.html. Accessed June 3, 2025 New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
58 predominantly zoned Downtown Residential – High (DRH) and Linden Neighborhood Center (LNC) and have General Plan designations of Medium High Density Residential and Linden Neighborhood Center. 89 The project would include construction of a new community park on land zoned for Parks and Recreation (PR). The project would not change the intended nature of land uses or physically divide an established community. Therefore, this impact would be less than significant, and mitigation is not required. b) Would the project cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect?
Less than Significant. The project would not conflict with any land use plan, policy, or regulation. The project would include the construction of a park with an event space in the Downtown subarea, which has limited park areas. This project fulfills the 2040 General Plan performance metric to ensure that all residents are within a 10-minute walk (0.5 mile) of a park, trail, or open space. The project also fulfills the following 2040 General Plan policies from the Land Use and Community Design and Abundant and Accessible Parks and Recreation Elements:90,91
• Policy LU-1.4: Maintain and expand public facilities and services; • Policy LU-1.5: Create places and opportunities for neighborhood events; • Policy LU-8.1: Expand arts and cultural programming in public spaces; • Policy LU-8.5: Provide plazas and gathering places;
• Policy PR-1.4: Ensure equitable distribution of park and recreation opportunities; and • Policy PR-1.9: Support community events.
The project would include the addition of improved sidewalks, bicycle racks, and an ADA-compliant parking space, which would fulfill the following policies:
• Policy LU-7.5: Foster pedestrian and bicycle access in neighborhood commercial development; • Policy LU-8.3: Improve pedestrian connections and sidewalks; and • Policy LU-8.9: Ensure ADA accessibility.
The project would include the removal of nine existing trees and the planting of approximately 30 to 35 new trees, which fulfills Policy LU-8.4 to require new development to add trees to streets and public 89 City of South San Francisco. 2025a. SSF Zoning Search App. Available at: https://zoning.ssf.net/. Accessed June 3, 2025. 90 City of South San Francisco. 2022e. City of South San Francisco 2040 General Plan Land Use and Community Design Element. Final Plan. Resolution #178-2022. Adopted October 12. Available at:
https://shapessf.com/land_use_and_community_design/. Accessed May 2025. 91 City of South San Francisco. 2022f. City of South San Francisco 2040 General Plan Abundant and Accessible Parks and Recreation Element. Final Plan. Resolution #178-2022. Adopted October 12. Available at: https://shapessf.com/abundantaccesible-parks-recreation/. Accessed May 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
59 places and integrates sustainable landscape strategies and Policy PR-7.8, including using low-water landscaping and green infrastructure for stormwater capture. 92,93 The project is located in the Airport Influence Area of SFO, in the Outer Boundary for Terminal Instrument Procedures (TERPS) approach and One Engine Inoperative (OEI) surfaces (see Figure 3-1, San Francisco International Airport, Airport Influence Areas). As discussed in Impact Discussion IX(e), this area defines the safe height of structures in the zone. The safe height is more than 150 feet above ground surface.94 The new park equipment, including the potential restroom, would be single-story, not exceeding 11 feet in height; therefore, the project would be well below the imaginary airspace surface.
The project would not conflict with any plans, policies, or regulations. Therefore, this impact would be less than significant, and mitigation is not required.
XII. Mineral Resources
Environmental Issues
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
Would the project:
(a) Result in the loss of availability of a known mineral resource that would be of value to the region and the
residents of the state?
☐ ☐ ☐ ☒
(b) Result in the loss of availability of a locally- important mineral resource recovery site delineated on a local
general plan, specific plan or other land use plan?
☐ ☐ ☐ ☒
Environmental Evaluation
a) Would the project result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the state? No Impact. A significant impact may occur if a project site were located in an area used or available for extraction of a regionally important mineral resource, if a project would convert an existing or future regionally important mineral extraction use to another use, or if a project would affect access to a site used or potentially available for regionally important mineral resource extraction.
The project site is not located in a mineral resource zone identified by the state. 95 Therefore, no impacts to
mineral resources of statewide or regional significance would occur. 92 City of South San Francisco. 2022e. City of South San Francisco 2040 General Plan Land Use and Community Design Element. Final Plan. Resolution #178-2022. Adopted October 12. Available at:
https://shapessf.com/land_use_and_community_design/. Accessed May 2025. 93 City of South San Francisco. 2022f. City of South San Francisco 2040 General Plan Abundant and Accessible Parks and Recreation Element. Final Plan. Resolution #178-2022. Adopted October 12. Available at: https://shapessf.com/abundantaccesible-parks-recreation/. Accessed May 2025. 94 City and County Association of Governments of San Mateo County (C/CAG). 2012. Comprehensive Airport Land Use Compatibility Plan for the Environs of San Francisco International Airport. Available at:
https://ccag.ca.gov/plansreportslibrary-2/airport-land-use/. Accessed June 3, 2025. 95 Stinson, M. C., M. W. Manson, J. J. Plappert, and others. 1982. Mineral Land Classification: Aggregate Materials in the San Francisco-Monterey Bay Area, Part II, Classification of Aggregate Resource Areas South San Francisco Bay ProductionConsumption Region. California Division of Mines and Geology Special Report 146.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
60 b) Would the project result in the loss of availability of a locally- important mineral resource recovery site delineated on a local general plan, specific plan or other land use plan?
No Impact. A significant impact would occur if a project site were located in an area used or available for extraction of a locally important mineral resource and the project converted an existing or potential future locally important mineral extraction use to another use, or if a project affected access to a site in use or potentially available for locally important mineral resource extraction.
The project site is located in the middle of an urban area. Neither the project site nor the surrounding area is identified as an area containing mineral deposits of local significance in the 2040 General Plan. 96 Therefore, no impacts to mineral resources of local significance would occur.
XIII. Noise
Environmental Issues
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
Would the project result in:
(a) Generation of a substantial temporary or permanent
increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable
standards of other agencies?
☐ ☒ ☐ ☐
(b) Generation of excessive groundborne vibration or
groundborne noise levels?
☐ ☐ ☒ ☐
(c) For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a
plan has not been adopted, within two miles of a
public airport or public use airport, would the project expose people residing or working in the project area
to excessive noise levels?
☐ ☐ ☒ ☐
Environmental Evaluation
South San Francisco Municipal Code Chapter 8.32 sets regulations for exterior noise levels (Section 8.32.030, Maximum Permissible Sound Levels). Maximum permissible sound levels in Table 3-7, Noise Level Standards, are the standards for a cumulative period of 30 minutes in any hour.
The maximum allowable noise level is determined by the land use category of the nearest sensitive receptor properties. The Noise Ordinance limits noise levels in single-family or multiple-family residential areas to 60 decibels (dB) between 7:00 a.m. and 10:00 p.m. Section 8.32.030(a) states it is unlawful for any person to operate any source of sound at any location within the city that causes the noise level when measured on any other property to exceed:
1. The noise level standard for the specified land use for a cumulative period of more than 30 minutes in any hour;
2. The noise level standard plus 5 dB for a cumulative period of more than 15 minutes in any hour; 96 City of South San Francisco. 2022a. City of South San Francisco 2040 General Plan. Final Plan. Resolution #178-2022.
Adopted October 12. Available at: https://shapessf.com/. Accessed January 2, 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
61 3. The noise level standard plus 10 dB for a cumulative period of more than 5 minutes in any hour;
4. The noise level standard plus 15 dB for a cumulative period of more than 1 minute in any hour; or
5. The noise level standard or the maximum measured ambient level, plus 20 dB for any period of time.
Table 3-7. Noise Level Standards
Land Use Category Time Period Noise Level (dB)
Single-family or duplex residential 10:00 p.m.–7:00 a.m. 50 7:00 a.m.–10:00 p.m. 60
Multiple-family residential or mixed residential/commercial 10:00 p.m.–7:00 a.m. 55 7:00 a.m.–10:00 p.m. 60
Commercial districts 10:00 p.m.–7:00 a.m. 60
7:00 a.m.–10:00 p.m. 65
Parks districts 10:00 p.m.–7:00 a.m. 70
7:00 a.m.–10:00 p.m. 70
Source: South San Francisco Municipal Code Section 8.32.030 (2023).
South San Francisco Municipal Code Section 8.32.040, Interior Noise Limits, regulates interior noise limits for multi-family residential property. Section 8.32.040 indicates that a noise level more than 10 dB above the level allowed by Section 8.32.030 measured 3 feet from any wall, floor, or ceiling inside any unit on the same property when the windows and doors of the unit are closed is unallowable.
South San Francisco Municipal Code Section 8.32.050, Special Provisions, allows construction activities that are authorized by a valid City permit between 8:00 a.m. and 8:00 p.m. on weekdays, 9:00 a.m. and 8:00 p.m. on Saturdays, and 10:00 a.m. and 6:00 p.m. on Sundays and holidays. Other hours may be authorized by the construction permit if the project meets one of the following criteria:
(1) No individual piece of equipment shall produce a noise level exceeding 90 dB at a distance of 25 feet. If the device is housed within a structure or trailer on the property, the measurement shall be made outside the structure at a distance as close to twenty-five feet from the equipment as possible; or
(2) The noise level at any point outside of the property plane of the project shall not exceed 90 dB.
According to South San Francisco Municipal Code Section 8.32.060, Exception Permits, if the applicant can show to the City Manager, or the Manager’s designee, that a diligent investigation of available noise abatement techniques indicates that immediate compliance with the requirements of this chapter would be impracticable or unreasonable, a permit to allow exception from the provisions contained in this chapter may be issued, with appropriate conditions to minimize the public determinant caused by such exceptions.
Any such permit shall be as short a duration as possible, but in no case for longer than 6 months. These permits are renewable upon a showing of good cause, and shall be conditioned by a schedule for compliance and details of compliance methods in appropriate cases.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
62 a) Would the project result in generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies?
Less than Significant with Mitigation Incorporated. The project would result in a significant impact if it would:
1. Allow construction to occur outside of hours specified in the permit;
2. Produce construction noise in excess of 90 dB at a distance of 25 feet or exceed 90 dB at any point outside the property plane of the project; or
3. Produce operational noise in excess of 60 dB at neighboring residential properties.
Residences, schools, hotels, childcare facilities, and convalescent facilities are typically considered noisesensitive land uses. The nearest potential residential receptors to the project site are single-family homes and duplexes located adjacent to the southeastern border on Pine Avenue and 7th Lane and 20 feet northeast on 8th Lane. Primary noise sources within the vicinity of the project site include vehicle traffic from Linden Avenue and local street traffic from Pine Avenue, 7th Lane, 8th Lane, and surrounding roadways. Secondary noise sources include aircraft overflights from SFO, distant train noise from Caltrain (0.27 mile southeast), and distant traffic noise from U.S. Route (US) 101 (approximately 800 feet east).
Construction
Project construction would include use of standard construction equipment, including excavators, graders, tractors, loaders, pavers, jackhammers, hoe rams, and cement trucks (Table 3-8, Typical Construction Equipment Noise Levels);
97 no pile driving is proposed.
Table 3-8. Typical Construction Equipment Noise Levels
Construction Equipment
Noise Level
(dB Lmax* at 50 feet)
Air compressor 78
Backhoe 78
Chain saw 84
Compactor 84
Concrete grinder 90
Concrete mixer truck 79
Concrete saw 90
Crane 81
Dozer 82
Dump truck 76
Flatbed truck 74
Front end loader 79
97 Federal Highway Administration (FHWA). 2006. FHWA Highway Construction Noise Handbook. Final Report.
U.S. Department of Transportation, Federal Highway Administration. August.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
63 Construction Equipment
Noise Level
(dB Lmax* at 50 feet)
Generator 81
Grader 85
Hoe ram 90
Jackhammer 89
Paver 77
Roller 80
Scraper 84
Source: Federal Highway Administration (FHWA) (2006).
* Lmax is the instantaneous maximum noise level for a specified period of time.
Noise from project construction would come from two general sources. Vehicles carrying the construction crew commuting to the project site, as well as truck transport of construction equipment and materials to the project site, would incrementally increase noise levels on roads leading to the project site. In addition, use of heavy construction equipment and hand tools during construction would incrementally increase noise levels on the project site. Worker commute and truck trips would result in intermittent noise increases on local roads but would not affect long-term ambient noise levels.
The second type of short‐term noise impact is related to noise generated during demolition, excavation, grading, and construction on the project site. Construction is performed in discrete steps, or phases, each with its own mix of equipment and, consequently, its own noise characteristics. These various sequential phases would change the character of the noise generated on-site. Therefore, the noise levels vary as construction progresses. Despite the variety in the type and size of construction equipment, similarities in the dominant noise sources and patterns of operation allow construction‐related noise ranges to be categorized by work phase. Louder types of construction equipment include graders, scrapers, and auger drill rigs as well as concrete saws, concrete grinders, and hoe rams (see Table 3-8, Typical Construction Equipment Noise Levels).98 The loudest phase of construction would likely be the demolition of the parking lot, followed by the excavation and grading.
For the proposed project, the combined loudest pieces of equipment during demolition and grading could reach 90 A-weighted decibels (dBA)
99 outside the property plane of the construction activity, which is the noise limit defined in the South San Francisco Municipal Code. 100 These higher noise levels could be
generated during (1) the use of concrete saws, jackhammers, and/or hoe ram during demolition of the parking lot, and (2) the use of earth-moving equipment and excavation activities and grading. If a valid City permit is obtained, construction activities would comply with the South San Francisco Noise Regulations, as long as no individual piece of equipment produces noise levels that exceed the construction noise limit of 90 dBA at the property line.
With implementation of Mitigation Measure NOI-1, the project would result in a less-than-significant impact related to generation of a substantial temporary increase in ambient noise levels that are in excess of standards established in the local general plan or noise ordinance or applicable standards of other agencies.
98 Federal Highway Administration (FHWA). 2006. FHWA Highway Construction Noise Handbook. Final Report.
U.S. Department of Transportation, Federal Highway Administration. August. 99 A-weighted decibels are a unit used to measure sound levels while approximating the human ear’s sensitivity to different frequencies.
100 FHWA, 2006.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
64 Operation
Existing ambient noise sources in the vicinity of the project site include automobile and truck traffic, commercial activities, surface parking lot activities, aircraft from SFO, and other miscellaneous noise sources associated with typical urban activities. The park would be open daily from dawn until dusk, with the exception of permitted special events. Under South San Francisco Municipal Code Section 10.36.180, Loitering During Certain Hours, park use between 9:00 p.m. and 6:00 a.m. would be prohibited. The new park would generate noise from daytime use of park facilities. Noise sources from the proposed park would include the picnic areas, playground, fitness area, active lawn areas, and vehicle trips generated by the project. General park recreational activities (e.g., picnics, exercise, small gatherings) that do not require the use of amplified sound systems would not be expected to substantially contribute to the existing ambient noise environment outside of the project site, which is dominated by traffic-generated noise. Playground use by children would likely generate the loudest sounds but would be unlikely to raise the ambient noise levels beyond 60 dB at adjacent residences during daytime hours. In addition, the park facilities would be buffered on the east side adjacent to the nearest residences by a privacy fence and new planting areas, which will buffer sound. Overall, general park operations associated with the project would not substantially contribute to the existing ambient noise environment at nearby sensitive receptors, and noise impacts from typical park operations would be less than significant.
The project would create a new City park, which would be equipped to host public events with amplification, such as concerts, dance performances, festivals, and movie nights. South San Francisco Municipal Code Section 8.32.050, Special Provisions, states that sound performances and special events not exceeding 80 dB measured at a distance of 50 feet from the loudest source are exempt from this chapter with City approval and Section 8.32.070, Amplified Sound—Permit Required, requires a permit from the chief of police for all events with amplified sound. Section 8.32.080, Amplified Sound— Regulations, permits amplified sound of music and human speech between 8:00 a.m. and 8:00 p.m., Monday through Saturday, and 10:00 a.m. and 8:00 p.m. on Sundays and holidays. For R-3, D-C, multiple-family, or mixed residential/commercial zones operational noise in excess of 60 dB at neighboring residential properties is prohibited between 7:00 a.m. and 10:00 p.m. and 50 dB is prohibited between 10:00 p.m. and 7:00 a.m. (see Table 3-7, Noise Level Standards). For R-3 and D-C zones a noise level in excess of 55 dB between 10:00 p.m. and 7:00 a.m. is not allowed (South San Francisco Municipal Code Table 8.32.030)
The City’s Special Event Permit process allows the City to assess potential impacts of any proposed event on the surrounding neighborhood and to ensure compliance with noise restrictions. All special events would be required to obtain permits from the City. Concerts and festivals would be required to end by 8:00 p.m. Movie nights would occur no more than four times per year and may have amplified noise audible up to 10:00 p.m., as outdoor movies can only be shown after sundown. This time surpasses the City’s noise ordinance and would only take place with City approval as well as a notice to neighbors within 500 feet of the park.Compliance with South San Francisco Municipal Code Chapter 8.32, Noise Regulations, and City Special Event Permit limitations would reduce impacts related to operational noise from the new park to less than significant.
Mitigation Measure NOI-1: The following measures shall be implemented to reduce construction noise impacts:
a. Secure a valid City of South San Francisco (City) permit for construction noise levels that could potentially temporarily exceed 90 decibels (dB) at the park’s property line in order to comply with the South San Francisco Municipal Code Chapter
8.32, Noise Regulations.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
65 b. Construction equipment and haul trucks shall use the best available noise control techniques, including improved mufflers, use of intake silencers, ducts, engine enclosures and acoustically attenuating barriers, curtains, and shields.
c. Site stationary noise sources, such as air compressors and generators, as far from adjacent sensitive receptors as possible.
These sources shall be muffled and enclosed within temporary sheds or incorporate insulation barriers, shields, or other attenuating measures.
d. If impact equipment and machinery are used, such as jack hammers, pavement breakers, and rock drills, they shall be hydraulically or electrically powered to avoid noise associated with air compressors or pneumatically powered tools. If the use of pneumatically powered tools is necessary, an exhaust muffler shall be installed on the air compressor. Such a muffler can lower noise levels from the exhaust by up to 10 A-weighted decibels (dBA). Similarly, the installation of external jackets on the tools can reduce noise levels by 5 dBA.
e. Material stockpiles and mobile equipment, staging, and parking areas shall be located as far as possible from noise-sensitive receptors (e.g., adjacent residences).
f. Notify all adjacent landowners and occupants of the properties adjacent to the project site of the anticipated construction schedule at least 2 weeks prior to ground-disturbing activities. g. Hold a preconstruction meeting with the Contractor
Superintendent, General Contractor, and City inspectors to confirm that all noise mitigation measures (including signage on construction hours, valid City exception permit, and liaison contact information) are completed.
b) Would the project result in generation of excessive groundborne vibration or groundborne noise levels?
Less than Significant. Groundborne vibration is the perceptible movement of building floors, rattling of windows and doors, shaking of items on shelves or walls, and generation of low-frequency rumbling sounds. For groundborne vibration, according to the Federal Transit Administration (FTA) guidelines, a vibration level of 65 vibration decibels (VdB) is the threshold of perceptibility for humans.101 For a significant impact to occur, vibration levels must exceed 80 VdB during infrequent events.102 Construction activities (e.g., ground-disturbing activities, including movement of heavy construction equipment and hauling of demolition debris and soil from the project site) may generate localized groundborne vibration and noise. Blasting or pile-driving activities would not occur during construction of the project. A hoe ram, jackhammers, and concrete saws would be used during demolition of the street and existing parking lot. A vibratory roller would be used for street and parking lot construction. 101 VdB is the vibration velocity level expressed in decibels relative to 1 micro-inch per second (1 × 10-6 inch per second).
102 Federal Highway Administration (FHWA). 2018. Transit Noise and Vibration Impact Assessment Manual. U.S. Department of Transportation, Federal Highway Administration. Available at:
https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/research-innovation/118131/transit-noise-and-vibration-impactassessment-manual-fta-report-no-0123_0.pdf. Accessed June 11, 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
66 Generally, construction-related groundborne vibration is not expected to extend beyond 25 feet from the generating source.
Construction equipment for demolition of the existing street and parking lot could include jackhammers, concrete saws, and a compactor machine (vibratory pad or drum roller). The closest sensitive receptors are residences on Pine Avenue and 7th Lane approximately 10 feet from the southwestern edge of the project area. The activities closest to the adjacent residences include the demolition of the parking lot and approximately 100 feet of Pine Street, rerouting and construction of Pine Avenue within the project envelope, and movement of haul trucks. Hauling of soils and debris could generate vibrations along local haul routes. The project is anticipated to require a total of approximately 140 round-trip truck trips to offhaul soil and demolition debris over the 10-month construction period. Parking lot and street demolition would take approximately 4 weeks. The maximum haul trips per day would likely be 20 one-way trips per day during the street and parking lot demolition phase. The movement of up to 20 haul trucks per day would not generate significant amounts of groundborne vibration. Therefore, this impact would be less than significant, and mitigation is not required.
c) For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels? Less than Significant. The nearest airport to the project site is SFO, located approximately 2 miles southeast. According to the 2040 General Plan Environmental Impact Report (EIR), 103 aircraft noise from
SFO is the primary source of transportation noise in the city. The project site is located within SFO ALUCP Airport Influence Area B (see Figure 3-1, San Francisco International Airport, Airport Influence Areas), which is based on a combination of the outer boundaries of the noise compatibility and airport safety zones.
104 However, the project site is located outside the aircraft noise exposure contour (Community Noise Equivalent Level [CNEL] Contour; see Figure 3-1, San Francisco International Airport, Airport Influence Areas). Therefore, because the project site is outside the airport noise exposure contour and would not introduce residents or employees to the area, the project would not expose people residing or working in the area to excessive noise levels associated with the nearby airport and airport noise impacts. Therefore, this impact would be less than significant, and mitigation is not required. 103 FirstCarbon Solutions. 2022. Final Environmental Impact Report for the General Plan Update, Zoning Code Amendments, and Climate Action Plan, City of South San Francisco, San Mateo County, California. State Clearinghouse Number 2021020064. Prepared for City of South San Francisco. September 6. Available at: https://shapessf.com/wpcontent/uploads/2022/09/SSF-GPU-Final-EIR_Combined.pdf. Accessed May 2025. 104 City and County Association of Governments of San Mateo County (C/CAG). 2012. Comprehensive Airport Land Use Compatibility Plan for the Environs of San Francisco International Airport. November. Available at: https://ccag.ca.gov/wpcontent/uploads/2014/10/Consolidated_CCAG_ALUCP_November-20121.pdf. Accessed June 5, 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
67 XIV. Population and Housing
Environmental Issues
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
Would the project:
(a) Induce substantial unplanned population growth in an area, either directly (for example, by proposing new
homes and businesses) or indirectly (for example,
through extension of roads or other infrastructure)?
☐ ☐ ☒ ☐
(b) Displace substantial numbers of existing people or
housing, necessitating the construction of
replacement housing elsewhere?
☐ ☐ ☐ ☒
Environmental Evaluation
a) Would the project induce substantial unplanned population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)? Less than Significant. City and County General Plans develop growth plans and projections for the areas in their jurisdictions. A significant impact would occur if a project included a General Plan amendment that could result in an increase in population over that projected in the adopted General Plan, or if a project would induce substantial growth on the project site or surrounding area.
Construction job opportunities created as a result of the project are not expected to result in any substantial population growth in the area. The work requirements of most construction projects are highly specialized so that construction workers remain at a job site only for the time frame during which their specific skills are needed. Additionally, the construction workers would likely be supplied from the region’s labor pool. Construction workers would not be likely to relocate their household as a consequence of working on the project, and as such, significant housing or population impacts would not result from construction of the project. There would be no construction-related population growth impacts. Therefore, no impact would occur.
Performance Metric 2 of the 2040 General Plan requires the City to have a park, trail, or open space within a 10-minute walk (0.5 mile) of all South San Francisco residents. The project would create a new neighborhood park in an area of the city with limited park space. The project would not create new housing or jobs, is not likely to attract more people to the surrounding area or cause people to move to the area, and would not introduce new persons to the population. Therefore, this impact would be less than significant, and mitigation is not required.
b) Would the project displace substantial numbers of existing people or housing, necessitating the construction of replacement housing elsewhere? No Impact. The project would create a new neighborhood park on an existing vacant lot and parking lot and would not displace people or housing. Therefore, no impact would occur.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
68 XV. Public Services
Environmental Issues
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
Would the project:
(a) Result in substantial adverse physical impacts
associated with the provision of new or physically
altered governmental facilities, need for new or
physically altered governmental facilities, the
construction of which could cause significant
environmental impacts, in order to maintain
acceptable service ratios, response times or other
performance objectives for any of the public services:
Fire protection? ☐ ☐ ☒ ☐
Police protection? ☐ ☐ ☒ ☐
Schools? ☐ ☐ ☐ ☒
Parks? ☐ ☐ ☒ ☐
Other public facilities? ☐ ☐ ☐ ☒
Environmental Evaluation
a) Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services:
Fire protection?
Less than Significant. The project would create a new neighborhood park. It would not increase the population in the area or introduce a hazard; therefore, it would not create a need for new or altered government facilities. A significant impact may occur if the SSFFD could not adequately serve a project, and a new or physically altered fire station would be necessary. The project area receives fire protection services from the SSFFD, which has three fire stations. The project site is in the response area for Fire Station 61, located at 480 North Canal Street, approximately 0.65 mile southwest of the project site. In addition, Fire Station 65 is located at 1151 South San Francisco Drive, approximately 0.85 mile northwest of the project site.105
The project would not increase population. The neighborhood park would be a place for recreational users to gather, but would draw primarily from residents in the Downtown neighborhood, and the majority of users are expected to walk to the park. The project would not cause a marked increase in recreational users. Therefore, a less-than-significant impact to fire protection services would occur, and mitigation is not required.
105 City of South San Francisco. 2025c. Fire Stations. Available at: https://www.ssf.net/departments/fire/fire-stations. Accessed March 21, 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
69 Police protection?
Less than Significant. A significant impact may occur if the South San Francisco Police Department (SSFPD) could not adequately serve a project, and a new or physically altered police station would be necessary. The project area receives law enforcement services from the Patrol Division of the SSFPD.
The Patrol Division consists of 40 officers and four patrol beats covering 11 square miles of the city.
The Police Station located at 1 Chestnut Avenue is located approximately 1.4 miles west of the project site.
106
The new neighborhood park would be a place for recreational users to gather, but would draw primarily from residents in the Downtown neighborhood, and the majority of users are expected to walk to the park.
The project would not increase the population in the area or introduce a hazard; therefore, it would not create a need for new or altered government facilities. The project would not bring new recreational users to the area or increase the demand for public services, including police protection. Therefore, a less-thansignificant impact to police protection services would occur, and mitigation is not required.
Schools?
No impact. The project area is served by the South San Francisco Unified School District (SSFUSD). A significant impact may occur if the SSFUSD could not adequately serve a project, and a new or physically altered school or schools would be necessary. The SSFUSD has nine elementary schools, three middle schools, three high schools, and an adult education program. Between 2011 and 2021, the enrollment declined by 1,306 students. Enrollment projections between 2021 and 2030 show an expected decrease in student population from 8,006 students to 6,759 students, a decrease of 1,247 or approximately 15.6%. 107
The project would create a new neighborhood park. The project would not increase the population in the area or the demand for public services, including schools. Therefore, no impact would occur.
Parks?
Less than Significant. A significant impact may occur if the project would result in the need for new or improved parks. The project would create a new neighborhood park in an underserved area of the city for park space. It would help the City meet requirements in the 2040 General Plan and Parks and Recreation Master Plan to provide access within walking distance to developed parks, trails, or open space for Linden neighborhood residents.
108,109
. The Downtown subarea is recognized as having extremely limited park space. Both the 2040 General Plan and Parks and Recreation Master Plan identify the lots at Linden Avenue and Pine Avenue for a park that would serve a densely populated area of the city. In addition, the South San Francisco Downtown Station Area Specific Plan recommends developing a neighborhood plaza on Linden Avenue between Pine Avenue and Aspen Avenue that could provide a gathering space 106 City of South San Francisco. 2025d. Police Stations. Available at: https://www.ssf.net/departments/police. Accessed March 21, 2025.
107 South San Francisco Unified School District (SSFUSD). 2022. South San Francisco Unified School District Long-Range Facilities Master Plan. August. Available at: https://4.files.edl.io/5a24/08/25/22/194515-5cce5154-3bcb-4222-9cc6- 9fff606d1143.pdf. Accessed March 21, 2025.
108 City of South San Francisco. 2022a. City of South San Francisco 2040 General Plan. Final Plan. Resolution #178-2022.
Adopted October 12. Available at: https://shapessf.com/. Accessed June 9, 2025. 109 City of South San Francisco. 2015b. City of South San Francisco Parks and Recreation Master Plan. Adopted July 22.
Available at: https://www.ssf.net/Departments/Parks-Recreation/About-Us/Parks-and-Recreation-Master-Plan. Accessed June 9, 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
70 for special events such as farmers’ markets, food trucks, or art, music, or cultural festivals, ideally adjacent to an outdoor usable green space and pocket park.110 The new facility would provide a plaza suitable for public gatherings and special events, as well as public green space for picnics and barbeques, art installations, a playground, and outdoor fitness area, and would enable the City to provide offerings of neighborhood events and activities. The proposed project would improve opportunities and access to park facilities in the underserved Linden neighborhood and would not create a need for new or improved parks. Adverse impacts from the project would be mitigated though adherence to required measures (e.g., Stormwater BMPs, dust control, etc.), City standard measures and mitigation measures. Therefore, this impact would be less than significant, and further mitigation is not required.
Other public facilities?
No impact. A significant impact may occur if the project would result in the need for other new or improved public facilities. Other public facilities include the Community Civic Campus, which includes a new Police Operations and 911 Dispatch Center, South San Francisco Main Library, Community Theater/Council Chamber, and Parks and Recreation facilities.
The project would create a new neighborhood park. The project would not increase the population in the area or the demand for public services, including libraries, theaters, or other uses. Therefore, no impact would occur.
XVI. Recreation
Environmental Issues
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
(a) Would the project increase the use of existing
neighborhood and regional parks or other recreational
facilities such that substantial physical deterioration of the facility would occur or be accelerated?
☐ ☐ ☐ ☒
(b) Does the project include recreational facilities or require the construction or expansion of recreational
facilities which might have an adverse physical effect
on the environment?
☐ ☐ ☒ ☐
Environmental Evaluation
a) Would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated? No Impact. A project would result in a significant impact to parks and recreation services if it would result in a significant increase in population from adding residential units. The project would create a new park in an underserved neighborhood of the city. It would not increase the population in the area. The majority of park users would be from the surrounding neighborhood and are expected to walk to the park. 110 City of South San Francisco. 2015a. South San Francisco Downtown Station Area Specific Plan. Adopted February.
Available at: https://shapessf.com/wp-content/uploads/2022/09/Adopted-DSASP-February-20.pdf.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
71 The park would serve the underserved Downtown neighborhood and provide a public space for neighborhood events and assist the City in achieving the Parks and Recreation Master Plan Goal 2 of having every resident within a 5-minute walk of a park or open space. 111
The Downtown neighborhood was identified as having limited park space in both the 2040 General Plan and Parks and Recreation Master Plan. Both plans identified the project area as a viable space for a new park. The project would provide park and event space to the Downtown neighborhood. The project would not introduce more people to the Downtown neighborhood or result in substantial physical deterioration of an existing park. Therefore, no impact would occur.
b) Does the project include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the environment?
Less than Significant. The project would construct a new park on an urban site that currently contains a parking lot and grassy field. The project would include the removal of nine existing trees and the planting of approximately 30 to 35 new trees and landscaping. Although the project would create a new recreational facility, it would not have a significant, adverse physical effect on the environment. As discussed in Section IV, Biological Resources; Section V, Cultural Resources; Section VII, Geology and Soils; Section X, Hydrology and Water Quality; and Section XVIII, Tribal Cultural Resources, all potentially significant impacts would be reduced to a less-than-significant level by mitigation incorporated into the project.
The project would create a neighborhood park in the Downtown subarea, which has limited park space, and would assist the City in achieving the Parks and Recreation Master Plan Goal 2 of having every resident within a 5-minute walk of a park or open space. Therefore, this impact would be less than significant, and mitigation is not required.
XVII. Transportation
Environmental Issues
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
Would the project:
(a) Conflict with a program plan, ordinance or policy
addressing the circulation system, including transit,
roadway, bicycle and pedestrian facilities?
☐ ☒ ☐ ☐
(b) Would the project conflict or be inconsistent with
CEQA Guidelines Section 15064.3, subdivision (b)? ☐ ☐ ☒ ☐ (c) Substantially increase hazards due to a geometric
design feature (e.g., sharp curves or dangerous
intersections) or incompatible uses (e.g., farm
equipment)?
☐ ☐ ☒ ☐
(d) Result in inadequate emergency access? ☐ ☒ ☐ ☐
111 City of South San Francisco. 2015b. City of South San Francisco Parks and Recreation Master Plan. Adopted July 22.
Available at: https://www.ssf.net/Departments/Parks-Recreation/About-Us/Parks-and-Recreation-Master-Plan. Accessed June 9, 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
72 Environmental Evaluation
REGULATORY SETTING
Federal Laws, Regulations, and Policies
No federal regulations are applicable to transportation in relation to the project.
State Laws, Regulations, and Policies
California Government Code Section 65402. California Government Code Section 65402 is applicable for roadway abandonment that is part of the project. California Government Code section 65402(a) states that a planning agency must review the conformity of certain actions with a general plan before those actions can be taken. This includes the acquisition or disposition of real property, street vacation or abandonment, and construction of public buildings. In addition, Government Code Section 65402 requires a street abandonment to first be reviewed at a public hearing before the Planning Commission, including a CEQA determination and a determination as to the proposal's conformance with the General Plan.
California Streets and Highway Code. Division 9, Part 3 – Public Streets, Highways and Service Vacation Laws, Sections 8300-8363, includes procedures to apply for roadway abandonment, such as would become part of the project. Specifically, California Vehicle Code Sections 8320-8325 pertain to the “General Vacation Procedure,” which outlines the process for a local agency to vacate (essentially close off) a public street, highway, or service easement, including requirements for initiating the process, public notice, hearings, and final resolution to vacate the area. This process essentially allows for the removal of a public right-of-way from a piece of land.
California Complete Streets Act of 2008 (Assembly Bill 1358). Originally passed in 2008, California’s Complete Streets Act took effect in 2011 and requires local jurisdictions to plan for land use transportation policies that reflect a “complete streets” approach to mobility. “Complete streets” comprises a suite of policies and street design guidelines that provide for the needs of all road users, including pedestrians, bicyclists, transit operators and riders, children, older people, and people with mobility issues.
Senate Bill 743. On September 27, 2013, SB 743 was signed into law. The California State Legislature found that, with the adoption of the Sustainable Communities and Climate Protection Act of 2008 (SB 375), the State had signaled its commitment to encourage land use and transportation planning decisions and investments that reduce vehicle miles traveled (VMT) and thereby contribute to the reduction of greenhouse gas (GHG) emissions, as required by the California Global Warming Solutions Act of 2006 (AB 32). Additionally, AB 1358 (described above) requires local governments to plan for a balanced, multimodal transportation network that meets the needs of all users. To further the State’s commitment to the goals of SB 375, AB 32, and AB 1358, SB 743 added Chapter 2.7, Modernization of Transportation Analysis for Transit-Oriented Infill Projects, to Division 13 (Section 21099) of the Public Resources Code.
On September 27, 2013, Governor Jerry Brown signed SB 743 into law and started a process intended to fundamentally change transportation impact analysis as part of CEQA compliance. Specifically, SB 743 removes the use of automobile delay, level of service (LOS), and other similar measures of vehicular capacity or traffic congestion for determining transportation impacts in environmental review. According to the legislative intent contained in SB 743, the move away from LOS is necessary to balance the needs of congestion management more appropriately with statewide goals related to infill development, promotion of public health through active transportation, and reduction of GHG emissions.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
73 The legislation also directed the State of California Governor’s Office of Planning and Research (OPR) to look at different metrics for identifying transportation impacts and make corresponding revisions to CEQA and the State CEQA Guidelines. OPR selected VMT as the preferred metric for assessing passenger vehicle-related impacts. In December 2018, OPR issued revised CEQA Statute & Guidelines, along with a Technical Advisory on Evaluating Transportation Impacts in CEQA112 to assist practitioners in implementing the CEQA Statute & Guidelines revisions to use VMT as the new metric.
City of South San Francisco approved VMT Guidelines to replace LOS with VMT as the City’s performance measure for CEQA analysis of transportation impacts and thresholds of significance for land use projects. The VMT Guidelines are included in a memo on Proposed VMT Threshold and Analysis Methods by Fehr & Peers, dated May 11, 2020.
Local Laws, Regulations, and Policies
The City of South San Francisco includes goals, policies, and implementation measures related to transportation.
South San Francisco General Plan. The Shape SSF 2040 General Plan provides a roadmap for the City to implement policies and actions that create a resilient community. The plan was adopted by the City Council in the summer of 2022. The Mobility Element includes goals, policies, and actions for ensuring safe, efficient movement of all transportation users to achieve the equity, environment, and quality of life outcomes in the City. Key ideas include:
• Transit is the first choice for regional travel. South San Francisco’s BART and Caltrain stations, and ferry terminal are all critical hubs of local and regional travel in the Bay Area. • South San Francisco is a city where daily activities and functions can be performed without the need or desire for a single occupancy vehicle.
• Plans and development activity emphasize transportation modes and strategies that ensure healthy air quality, reduce greenhouse gas emissions, and reduce the need to devote additional lands to transportation uses.
REGIONAL AND LOCAL ACCESS
Regional access is provided by US 101, I-280, Airport Boulevard, Miller Avenue, El Camino Real, Cypress Avenue, and Grand Avenue. Local access is provided by Linden Avenue, Pine Avenue, 7th Lane, and 8th Lane.
The project site is located on the east side of Linden Avenue, between 8th Lane to the north and 7th Lane to the south. The site is comprised of two parcels (616 Linden Avenue and 700 Linden Avenue) and an approximately 100-foot long section of Pine Avenue that bisects the project site. 616 Linden Avenue is currently an active parking lot and 700 Linden Avenue is a vacant grass lot. The two parcels are proposed to be redeveloped into a park with a children’s play area, a space for recreation, a sports court, spaces for community gathering and public art. A detailed transportation analysis has been conducted for the proposed project and included as Appendix E.
As described in the detailed transportation study in Appendix E and the Design review in Appendix A3, the preferred concept plan for the park is proposing to reconfigure the intersection of Linden Avenue and 112 California Governor’s Office of Planning and Research (OPR). 2018. Technical Advisory on Evaluating Transportation Impacts in CEQA. April. Available at: https://lci.ca.gov/docs/20180416-743_Technical_Advisory_4.16.18.pdf. Accessed July 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
74 Pine Avenue to operate as a three-legged intersection without the east leg. Pine Avenue, east of Linden Avenue would be closed off to vehicular traffic and be replaced with a one-way alley along the eastern boundary of the park that would connect to 7th Lane. Westbound vehicles on Pine Avenue would be able to make a left turn onto the new alley and a right turn onto 7th Lane to connect to Linden Avenue. The one-way alley would be designed to accommodate trucks, including fire apparatus.
Access to the proposed park would be provided primarily via Pine Avenue and Linden Avenue. The project will not construct any driveways. In addition to the existing on-street parking on Linden Avenue, new on-street parking will be provided along the project frontage on the one-way alley, 8th Lane, and 7th Lane. A new crosswalk with stop-control will be installed at the junction between Pine Avenue and the new one-way alley that extends to 7th Lane. The width of the one-way alley, which measures 20 feet, and the dimensions of the adjacent parallel parking spaces (8.5 feet by 20 feet), meet fire truck access and City Code standards. The dimensions of the angled parking spaces (8.5 feet by 19.5 feet) along the project frontage on 8th Lane and 7th Lane also meet City Code standards.
The conceptual site plan shows pedestrian pathways from the on-street parking interconnected to all areas of the park, as well as to the existing sidewalks along the project frontages (see Figure 2-1, Project Site Plan).
PUBLIC TRANSIT
The project site is served by San Mateo County Transit District (SamTrans) Bus Routes 37, 130, and 141, which all have a stop at the corner of Linden and California Avenues, one block south of the project site.
The bus routes offer connections to Daly City, San Bruno, Alta Loma School via Route 37; Daly City Bay Area Rapid Transit (BART) via Route 130; and San Bruno, Pacifica, and Skyline College via Route 141.113 In addition, the Free South City Shuttle, which stops at the corners of Linden and California Avenues and Linden and Aspen Avenues, provides a circular route within the city connecting schools, parks, the Municipal Services Building, the downtown area, Kaiser Hospital, and senior centers, as well as connecting transportation to SamTrans stops and the South San Francisco BART station.114 The South San Francisco Caltrain station is located approximately 0.25 mile southeast of the project site.
PEDESTRIAN/BICYCLE TRANSIT
The conceptual site plan shows pedestrian pathways from the on-street parking interconnected to all areas of the park, as well as to the existing sidewalks along the project frontages (see Figure 2-1, Project Site Plan).
ADA/EV PARKING
One ADA parking space is provided on the north side of the new park via a diagonal stall on 8th Lane. No ADA parking is proposed on the south side of the park at 7th Lane. No EV parking is currently provided. 113 San Mateo County Transit District (SamTrans). 2025. Schedules and Maps. Available at:
https://www.samtrans.com/schedulesmaps?active_tab=route_explorer_tab. Accessed July 21, 2025. 114 City of South San Francisco. 2025. Free South City Shuttle. Available at: https://www.ssf.net/Services/Free-South-CityShuttle. Accessed July 21, 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
75 a) Would the project conflict with a program plan, ordinance or policy addressing the circulation system, including transit, roadway, bicycle and pedestrian facilities?
Construction
Less Than Significant with Mitigation. The Proposed Project would involve construction of a new park by combining two vacant parcels and addition of a new one-way street to access 7th Lane. This would require closure and demolition of the east leg of the Pine Avenue and Linden Avenue intersection.
Activities taking place during the demolition/construction phase would likely have short-term impacts on the surrounding transportation circulation system. While construction is considered short term, the duration of the construction phase will be identified by the construction management plan. Construction may include additional truck traffic, temporary street closures, partial lane closures, and/or traffic detours.
The transportation system, including day-to-day vehicular traffic, emergency response vehicles, pedestrians, bicycles, and transit, may experience temporary delays or detours. While construction will likely be phased to minimize road closures, residents on Pine Avenue will need to access and exit to the east at Cypress Road until the one-way lane to 7th Lane is fully operational. During construction, access will be maintained for surrounding land uses. Therefore, this impact would be considered potentially significant. In response, the City will implement Mitigation Measure TR-1 that would ensure less-thansignificant impacts related to access to surrounding land uses would be maintained during construction activities and avoid potential conflicts with the City’s circulation plans and policies.
Operations
Less than Significant. Following final design review of the project plans and completion of construction, the Project would not conflict with the South San Francisco General Plan or with established City Code standards. As described in the detailed transportation study in Appendix E and the design review in Appendix A3, the preferred concept plan for the park is proposing to reconfigure the intersection of Linden Avenue and Pine Avenue to operate as a three-legged intersection without the east leg. Pine Avenue, east of Linden Avenue would be closed off to vehicular traffic and be replaced with a one-way alley along the eastern boundary of the park that would connect to 7th Lane. Westbound vehicles on Pine Avenue would be able to make a left turn onto the new alley and a right turn onto 7th Lane to connect to Linden Avenue. The one-way alley would be designed to accommodate trucks, including fire apparatus.
The transportation study described how traffic will be rerouted around the road closure and can be adequately accommodated within the existing circulation network without additional operational deficiencies.
Access to the proposed park would be primarily provided via Linden Avenue and Pine Avenue. The project will not construct any driveways. Additional access to the project frontage will be provided via 7th Lane and 8th Lane. In addition to the existing on-street parking on Linden Avenue, new on-street parking will be provided along the project frontage on the one-way alley, 8th Lane, and 7th Lane. A new crosswalk with stop-control will be installed at the junction between Pine Avenue and the new one-way alley that extends to 7th Lane. The width of the one-way alley, which measures 20 feet, and the dimensions of the adjacent parallel parking spaces (8.5 feet × 20 feet), meet fire truck access and City Code standards. The dimensions of the angled parking spaces (8.5 feet × 19.5 feet) along the project frontage on 8th Lane and 7th Lane also meet City Code standards.
The conceptual site plan shows pedestrian pathways from the on-street parking interconnected to all areas of the park, as well as to the existing sidewalks along the project frontages (Figure 2-1, Project Site Plan).
The Site Plan Review conducted by Hexagon Transportation Consultants, shown in Appendix A3, provides recommendations to improve the traffic flow and safety to accommodate all users, including New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
76 pedestrians and park users. If the project is implemented based on the site plan and design review, the project would not conflict with any program plans, ordinances or policy addressing circulation. With implementation of the project as identified in the transportation study (see Appendix E) and the design review (see Appendix A3), the proposed project’s circulation plan would have a less-than-significant impact, and mitigation is not required.
b) Would the project conflict or be inconsistent with CEQA Guidelines Section 15064.3, subdivision (b)?
Less than Significant. In accordance with Senate Bill (SB) 743 and the City’s Transportation Analysis Guidelines, vehicle miles traveled (VMT) has replaced level of service (LOS) for use in transportation analyses pursuant to the California Environmental Quality Act (CEQA).115 As a result, traffic volumes on the surrounding network and LOS and delay impacts are not evaluated per SB 743. These effects are described in the detailed transportation study in Appendix E as non-CEQA effects and were further addressed above in Impact Discussion XVII(a).
According to the City’s Transportation Analysis Guidelines, dated October 2022, some projects may be screened out, or assumed to have a less-than-significant impact on VMT, if they fall within the following categories:
1. Projects located within ½-mile walkshed around major transit stops.
2. 50% affordable housing projects.
3. Small projects that generate less than 100 new trips per day.
4. Locally serving public facilities that encompass government, civic, cultural, health, and
5. infrastructure uses and activity which contribute to and support community needs.
6. Neighborhood-serving retail projects that are less than 50,000 square feet.
7. Hotels designed to serve business travelers or individuals flying in or out of SFO
8. Residential and office projects in low VMT areas.116 The daily vehicle trips generated by the project were estimated using the Institute of Transportation Engineers (ITE) Trip Generation Manual117 for Land Use 411, Public Parks. Table 3-9, Trip Generation, shows the daily trips that would be generated by the proposed project. The ITE trip rates are conservative as they are based on surveys for parks located primarily in suburban areas where a majority of trips are made by vehicles. Given the location of the proposed park and its accessibility to the surrounding residential neighborhoods, it was assumed that approximately 50% of these trips would be either walk or bike trips. Based on this assumption, it is anticipated that the proposed park would generate 45 vehicle trips daily. Therefore, the proposed project is considered a small project with less than 100 new trips per day.
115 City of South San Francisco. 2022a. South San Francisco General Plan Update: Transportation Analysis Guidelines.
Available at: https://www.ssf.net/files/assets/public/v/1/economic-amp-community-development/documents/transportationanalysis-gu.pdf. Accessed July 21, 2025. 116 City of South San Francisco. 2022a. South San Francisco General Plan Update: Transportation Analysis Guidelines.
Available at: https://www.ssf.net/files/assets/public/v/1/economic-amp-community-development/documents/transportationanalysis-gu.pdf. Accessed July 21, 2025. 117 Institute of Transportation Engineers (ITE). 2021. Trip Generation Manual. Eleventh Edition. September.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
77 Table 3-9. Trip Generation
Land Use Size Daily Rate Daily Trips
Public Park1 0.68 130.73 89
Estimated Vehicle Trips2
(Assumed 50% of the total trips are non-auto trips
45 Source: ITE (2021).
1 Fitted curve equation for daily and PM peak hour and average rates for AM peak hour for Public Park (ITE Land Use 411). Daily and PM peak hour trips based on the fitted curve equations represent a conservative analysis as the park would generate fewer than 10 daily trips using the average trip rate.
2 Given the location of the proposed park and its accessibility to the surrounding residential neighborhoods, it was assumed that approximately 50% of these trips would be either walk or bike trips.
According to the State of California Governor’s Office of Land Use and Climate Innovation (LCI; formerly OPR) Technical Advisory on Evaluating Transportation Impacts in CEQA118 and the City’s Transportation Analysis Guidelines,
119 neighborhood parks are classified as locally serving public facilities. Such facilities typically redistribute existing trips within the community rather than generating new trips, as they are intended to provide amenities close to where residents live. In this case, the proposed park would reduce the need for residents to travel outside the neighborhood to access recreational facilities, thereby shortening trip lengths and supporting local access. Consistent with LCI and City guidance, locally serving public facilities such as parks are eligible for VMT screening and are not required to undergo detailed VMT analysis.
Given the proposed project is considered a small project with less than 100 new trips per day, and is a locally serving public facility, it is assumed to screen out for VMT. The project would not conflict or be inconsistent with State CEQA Guidelines Section 15064.3(b) regarding VMT. Therefore, impacts would be less than significant, and mitigation is not required. c) Would the project substantially increase hazards due to a geometric design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)?
Less Than Significant. The preferred option is proposing to close Pine Avenue at Linden Avenue and instead convert the west end of Pine Avenue to a westbound one-way alley terminating at 7th Lane. The Site Plan Review conducted by Hexagon Transportation Consultants, and shown in Appendix A3, provides recommendations to improve the traffic flow and safety to accommodate all users, including pedestrians and park users. The alley exit to 7th Lane will include curb channelizing, right turn only road striping, a stop bar and stop signage, a pedestrian crossing, and signs for do not enter and no right turn from 7th Lane to the alley. With the proposed recommendations incorporated into the project design, the geometric design does not create any sharp curves or hazards, and is able to accommodate pedestrians and one-way traffic to access 7th Lane and reduce potential hazards to less than significant; mitigation is not required.
118 California Governor’s Office of Planning and Research (OPR). 2018. Technical Advisory on Evaluating Transportation Impacts in CEQA. April. Available at: https://lci.ca.gov/docs/20180416-743_Technical_Advisory_4.16.18.pdf. Accessed July 2025.
119 City of South San Francisco. 2022a. South San Francisco General Plan Update: Transportation Analysis Guidelines.
Available at: https://www.ssf.net/files/assets/public/v/1/economic-amp-community-development/documents/transportationanalysis-gu.pdf. Accessed July 21, 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
78 d) Would the project result in inadequate emergency access? Construction
Less than Significant with Mitigation. The Proposed Project would involve demolition of the east leg of the Pine Avenue and Linden Avenue intersection, combine the two vacant parcels into a new park and construct a new one-way alley extension of Pine Avenue to access 7th Lane. Activities taking place during the demolition/construction phase would likely have short-term impacts on the surrounding transportation system. This would include additional truck traffic, temporary street closures, partial lane closures, and/or traffic detours. While construction is considered short term, the duration of the construction phase will be identified by the construction management plan. The transportation system, including emergency response vehicles, may experience temporary delays or detours. While construction will likely be phased to minimize road closures, emergency access to residents on Pine Avenue will need to be maintained to access the residential areas via Cypress Avenue until the one-way lane to 7th Lane alley is fully operational.
During short-term construction activities including the associated roadway improvements, partial or complete road closures may be required along Linden Avenue, 7th Lane, and 8th Lane to accommodate roadway and parking improvements. Closures would not impact individual access to other properties. The City’s General Plan does not identify emergency evacuation routes. Linden Avenue is identified as a connector and 7th Lane, 8th Lane, and Pine Avenue are identified as neighborhood streets.120 During the construction phase, the City would require an encroachment permit for any temporary activities that would affect the public right-of-way. Encroachment permit conditions would include a traffic control plan with temporary procedures for emergency access. Additionally, in the event of partial lane closures, sufficient alternative routes exist near the project site and the project would not interfere with or result in inadequate emergency access.
Therefore, this impact would be considered potentially significant without mitigation. In response, the City will implement Mitigation Measure TR-1 that would ensure access to surrounding land uses would be maintained during construction activities and avoid potential conflicts with the City’s circulation plans and policies.
Mitigation Measure TR-1 would reduce the potential for such conflict to a less-than-significant level. As a result, impacts to emergency access related to construction would be less than significant with mitigation.
Operations
Less Than Significant. Emergency access to properties along the park frontage would be maintained via Pine Avenue and Linden Avenue (north and south of the temporary street closure). With the preferred option proposing to convert the west end of Pine Avenue to a westbound one-way alley terminating at 7th Lane, emergency access to residences along Pine Avenue would require entry via Cypress Avenue.
The closure of Pine Avenue is expected to result in minimal traffic diversion, with an estimated 57 vehicles during the AM peak hour and 45 vehicles during the PM peak hour. As documented in the transportation study provided in Appendix E, nearby intersections are anticipated to continue operating at LOS C or better during both peak periods. Furthermore, due to the grid street network in the project area, circulation impacts will be limited, as the project site could be accessed via Cypress Avenue. This 120 City of South San Francisco. 2022b. South San Francisco General Plan 2040, Chapter 9. Mobility and Access. Figure 14.
Available at: https://shapessf.com/. Accessed July 21, 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
79 modification is not anticipated to result in inadequate emergency access to the park or to the existing residents along Pine Avenue, and is therefore determined to be less than significant.
During special events, temporary barricades would be used to close Linden Avenue and could be moved or adjusted as needed to accommodate emergency vehicles. Therefore, emergency access would not be impeded during event-related closures.
Mitigation Measures
Mitigation Measure TR-1 Develop and Implement a Construction Traffic Management Plan.
The City of South San Francisco shall require that the construction contractor develop and implement a construction traffic management plan for the Proposed Project site. The plan will clearly identify how construction will be phased and access for emergency vehicles will be maintained to and around the site during construction. The plan will also describe how access and circulation for pedestrians, cars, cyclists, and transit will be maintained around the site during construction.
XVIII. Tribal Cultural Resources
Environmental Issues
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
(a) Would the project cause a substantial adverse
change in the significance of a tribal cultural resource, defined in Public Resources Code Section 21074 as
either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope
of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that
is:
(i) Listed or eligible for listing in the California
Register of Historical Resources, or in a local
register of historical resources as defined in
Public Resources Code Section 5020.1(k), or
☐ ☒ ☐ ☐
(ii) A resource determined by the lead agency, in its
discretion and supported by substantial
evidence, to be significant pursuant to criteria set
forth in subdivision (c) of Public Resources Code
Section 5024.1. In applying the criteria set forth
in subdivision (c) of Public Resource Code
Section 5024.1, the lead agency shall consider
the significance of the resource to a California
Native American tribe.
☐ ☒ ☐ ☐
Environmental Evaluation
At the time of the initial European contact with the Indigenous population of the San Francisco Bay area, Costanoans (from the Spanish costaños, or “coast people”), members of the Penutian linguistic family, inhabited the area from the Carquinez Strait and the northern tip of the San Francisco Peninsula to the region south of Monterey Bay and east to the Diablo Range. These Indigenous peoples, called Ohlone, entered the Bay Area approximately 1,500 years ago. They came from the Delta region and displaced earlier Hokan speakers. An estimated 7,000 to 10,000 Indigenous peoples lived near San Francisco Bay New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
80 by the time of European contact in the eighteenth century. According to the 2040 General Plan EIR and consistent with the City’s historic context as an Ohlone settlement location, there are Indigenous village and archaeological sites scattered around the city of South San Francisco. Known resources occur along the El Camino Real corridor, in the San Bruno Mountains, and adjacent to portions of Colma Creek.
AB 52 establishes a formal consultation process for California Tribes in the CEQA process, requiring the lead agency to initiate consultation with California Native American groups when a decision to undertake a project or determination that a project is complete (e.g., prior to the release of a negative declaration, MND, or EIR), lead agencies are required to notify Tribes who previously requested placement on the notification list.
On April 23, 2025, the City provided formal notification in writing to eight separate Native American groups and received one initial request for consultation. The request for consultation was followed up by the City on 12 separate documented instances, including by phone, email, and text, but was ultimately not reciprocated by the representative originally requesting consultation. The below Tribal Cultural Resources discussion is based on results of the NAHC Sacred Lands File Search and the Cultural Resources Inventory Report for the South San Francisco Linden/Pine Avenues Park Project (August 2025),121 and the existing disturbed environment of the project site, and best managing practices conducted by the City. a) Would the project cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code Section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is:
a-i) Listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public Resources Code Section 5020.1(k)?
Less than Significant with Mitigation Incorporated. The proposed project would not cause substantial adverse change in the significance of a tribal cultural resource that is listed or eligible for listing in the California Register of Historical Resources (CRHR) or in another local register. The project site vicinity was traditionally occupied by the Muwekma Ramaytush Ohlone people, who historically occupied the San Francisco Peninsula from Mountain View to the Golden Gate, including Alcatraz Island. The Muwekma Raymatush Ohlone people consisted of eight or more separate tribes at the time of European contact. According to the NAHC Sacred Lands File (SLF) no known tribal cultural resources are located within the project area. There are no Native American tribal heritage sites recorded within the proposed project site or vicinity.
A review of soils data indicates the project area lies in an area of Urban land that includes a complex assortment of artificial cutting and filling. Historical topographic maps indicate the project area was located along the 60-foot elevation contour, but elevations currently range between about 55 and 48 feet above mean sea level. This suggests that roughly 5 to 12 feet of material may have been cut and removed from the former land surface.
Given the negative results of the NAHC Sacred Lands File Search and the Cultural Resources Inventory Report for the South San Francisco Linden/Pine Avenues Park Project (August 2025), and the existing 121 SWCA Environmental Consultants (SWCA). Cultural Resources Inventory Report for the South San Francisco Linden/Pine Avenues Park Project, South San Francisco, San Mateo County, California. Prepared for City of South San Francisco. SWCA Environmental Consultants, Half Moon Bay, California. August.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
81 disturbed environment of the Project site, it was concluded that the proposed project would have a lessthan-significant impact on tribal cultural resources with implementation of Mitigation Measure TCR-1, which would be implemented in the event that unanticipated prehistoric cultural resources (or tribal cultural resources) are exposed during project construction.
Mitigation Measure TCR-1: The following measures shall be implemented prior to project implementation and in the event that unanticipated prehistoric cultural resources or tribal cultural resources are exposed during project construction:
a. All construction staff must receive worker environment awareness training (WEAP) that identifies the identification and proper treatment of tribal cultural resources.
b. In the event that unanticipated prehistoric cultural resources are exposed during disturbance activities, work within 15 meters (50 feet) of the find (Find Site) must stop and the California Native American Heritage Commission must be contacted to identify a local Native American Tribal member to provide monitoring inspection of any further construction work at the Find Site. Work may not resume at the Find Site until a Tribal member is present to provide monitoring inspection.
a-ii) A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code Section 5024.1. In applying the criteria set forth in subdivision (c) of Public Resource Code Section 5024.1, the lead agency shall consider the significance of the resource to a California Native American tribe.
Less than Significant with Mitigation Incorporated. The City of has considered the significance of potential tribal cultural resources on the project site and vicinity to Indigenous Tribes. Based on the reasons that the results of the NAHC SLF search were negative and with implementation of Mitigation Measure TCR-1, as summarized above, impacts on tribal cultural resources would be less than significant with mitigation incorporated.
XIX. Utilities and Service Systems
Environmental Issues
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
Would the project:
(a) Require or result in the relocation or construction of new or expanded water, wastewater treatment or
storm water drainage, electric power, natural gas, or
telecommunications facilities, the construction or
relocation of which could cause significant
environmental effects?
☐ ☐ ☒ ☐
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
82 Environmental Issues
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
(b) Have sufficient water supplies available to serve the project and reasonably foreseeable future
development during normal, dry and multiple dry
years?
☐ ☐ ☒ ☐
(c) Result in a determination by the wastewater treatment provider which serves or may serve the project that it
has adequate capacity to serve the project’s projected
demand in addition to the provider’s existing
commitments?
☐ ☐ ☒ ☐
(d) Generate solid waste in excess of State or local
standards, or in excess of the capacity of local
infrastructure, or otherwise impair the attainment of
solid waste reduction goals?
☐ ☐ ☒ ☐
(e) Comply with federal, state, and local management
and reduction statutes and regulations related to solid waste?
☐ ☐ ☐ ☒
Environmental Evaluation
a) Would the project require or result in the relocation or construction of new or expanded water, wastewater treatment or storm water drainage, electric power, natural gas, or telecommunications facilities, the construction or relocation of which could cause significant environmental effects? Water
Less than Significant. The California Water Service (CalWater), South San Francisco Division, supplies water for project construction and operation, and the majority of their supply (80%) is purchased from the San Francisco Regional Water System (SF RWS). The remaining water is drawn from local groundwater wells. CalWater serves 64,146 people in an 11.2-square-mile area, which has an average demand of 5.64 million gallons per day (mgd).
122 CalWater has an Individual Supply Guarantee of 35.68 mgd (approximately 39,993 acre-feet per year [AFY]), which is shared among its Bear Gulch, Mid-Peninsula, and South San Francisco Districts, from the San Francisco Public Utilities Commission (SFPUC). In addition to the water from the SFPUC, CalWater obtains a maximum of approximately 1.37 mgd (1,534 AFY) from local sources in the Westside Groundwater Basin during a non-drought year. The Westside Groundwater Basin is categorized by the DWR as a very low-priority basin and is actively managed to prevent significant overdraft.123 Between 2016 and 2020, CalWater supplied an average of 6,837 AFY of potable water.124 The Downtown neighborhood is served by all public utilities. The new park would tie into existing water lines in Pine Avenue and no new water distribution infrastructure would be needed.
122 Bay Area Water Supply and Conservation Agency (BAWSCA). 2025. California Water Service - South San Francisco District. Available at: https://bawsca.org/members/profiles/cws-san-francisco. Accessed June 11, 2025. 123 California Water Service (CalWater). 2021. 2020 Urban Water Management Plan, South San Francisco District. June.
Available at: https://www.calwater.com/docs/uwmp2020/SSF_2020_UWMP_FINAL.pdf. Accessed March 21, 2025 124 CalWater, 2021.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
83 Construction activities would require a minimal amount of water for dust control and cement mixing, and water would be delivered to the project site by water truck. Project operation would use water for landscape irrigation and the potential new restroom. Landscaping would include drought-tolerant plants with low water requirements and the landscape irrigation system would use a high-efficiency system with smart controls. The public restroom would include water efficient (1.6 gallons/flush) toilets. Overall, restroom water use would likely be between 130 and 326 gallons per day, or less than 0.01% of the 5.64 mgd average daily demand.125 The project would not result in the relocation or construction of new or expanded water treatment facilities. Therefore, this impact would be less than significant, and mitigation is not required.
Wastewater
Less than Significant. Wastewater treatment is provided by South San Francisco/San Bruno Water Quality Control Plant (SSWQCP), which is located along Colma Creek near San Francisco Bay. The SSWQCP receives an average dry weather flow of approximately 9 mgd and has capacity to treat up to 13 mgd in average dry weather flow. Peak wet weather flows can exceed 60 mgd. 126 The SSWQCP last
experienced flows that exceeded maximum peak wet weather capacity on December 31, 2022. 127
Construction of the project would produce minimal wastewater from construction crew use of portable toilets. The project may add a new restroom facility at the park. Operation of the project would produce a minimal permanent change in wastewater production. The new park would tie into existing sewer lines in Pine Avenue and no new sewer collection infrastructure would be needed. The project would not result in the relocation or construction of new wastewater treatment facilities. Therefore, this impact would be less than significant, and mitigation is not required.
Stormwater
Less than Significant. The project would decrease the existing impervious surface area and include a total of approximately 16,200 square feet of new impervious surface area, which would drain to new LID stormwater treatment and retention facilities on-site. Overflow would drain to the existing bioretention basins and storm drain in Linden Avenue and eventually to Colma Creek. The project would include drainage improvements that meet the requirements of the SMCWPPP to prevent sediment-laden runoff to the stormwater system and Colma Creek. Therefore, project operation would not create a need for new stormwater facilities, and this impact would be less than significant.
As discussed in Impact Discussion X(a), the project would disturb less than 1 acre of land (approximately
0.80 acre); therefore, the City would be required to implement stormwater BMPs under the SMCWPPP during project construction. A drainage control plan with site-specific BMPs that meet the requirements of the SMCWPPP and are designed to prevent runoff from construction areas would be implemented to reduce potential impacts to surface water quality during project construction. The plan would also include design elements and BMPs for construction areas, such as fueling and equipment washing areas, and trash and hazardous material storage areas. 128 Therefore, impacts related to stormwater runoff during construction would be less than significant, and mitigation is not required. 125 Daily water demand: toilets = 80–200 gallons per day (gpd); sinks = 25–63 gpd; drinking water/bottle refill = 25–62 gpd. 126 City of South San Francisco. 2025e. Water Quality Control PlantDivision: Treatment Process. Available at:
https://www.ssf.net/departments/public-works/water-quality-control-plant/treatment-process. Accessed March 21, 2025. 127 City of South San Francisco, 2025e.
128 County of San Mateo. 2023. San Mateo Countywide Water Pollution Prevention Program: Construction Best Practices.
Available at: https://www.flowstobay.org/construction. Accessed June 3, 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
84 Gas and Electricity
Less than Significant. Electric power services are provided by Peninsula Clean Energy (PCE) and PG&E. The City entered a Joint Powers Agreement with PCE in 2016. As a member of PCE, residents and businesses are automatically enrolled in PCE in an effort to reduce GHG emissions and combat global warming, and offers the option to remain using PG&E as an energy provider. PCE purchases electricity directly from renewable energy sources, and PG&E delivers the electricity to homes and businesses using its existing transmission and distribution lines.129 PG&E additionally provides the City’s natural gas.
The project would have new electrical demands associated with new park lighting and provision for sound systems for concerts and other gatherings. The project would be all-electric and would result in a small increase in existing electricity use. Therefore, this impact would be less than significant, and mitigation is not required.
The project would be all electric and would not extend gas infrastructure; therefore, no impact related to natural gas use would occur.
Telecommunications
No Impact. The project would create a new neighborhood park and would not appreciably change existing telecommunications use. Therefore, no impact related to telecommunications infrastructure would occur.
b) Would the project have sufficient water supplies available to serve the project and reasonably foreseeable future development during normal, dry and multiple dry years?
Less than Significant. The project area is served by CalWater, South San Francisco District.
As discussed in Impact Discussion XIX(a), 80% of CalWater’s supply for their South San Francisco District is purchased from the SFRWS and originates in the Hetch Hetchy Reservoir, and the remaining 20% is drawn from local groundwater wells. In 2019 the State Water Board adopted amendments to the Water Quality Control Plan for the San Francisco Bay/Sacramento-San Joaquin Delta Estuary (Bay-Delta Plan) that increase flows in the Tuolumne River in order to protect Bay-Delta water quality.130 The Bay-Delta Plan Amendment is still under review but would reduce projected water availability in dry years from 257 mgd to 152 mgd. As a result, the SFPUC, which oversees the SFRWS, has developed the Alternative Water Supply Plan to fill the water supply gap of 92 mgd to 122 mgd, which could occur in dry years. There are six water supply projects under consideration that could augment supply by 22 mgd to 48 mgd in dry years. The SFPUC is currently working on a Voluntary Settlement Agreement with the state, as well as pursuing the Alternative Water Supply Plan, which could provide additional water to meet current and future obligations. In the meantime, supply and demand projections are based on the currently adopted amendment.
131
129 City of South San Francisco. 2025f. Community Choice Energy. Available at: https://www.ssf.net/Departments/CityManager/Sustainability/Community-Choice-Energy. Accessed June 11, 2025. 130 State Water Resources Control Board (State Water Board). 2025. Bay-Delta Plan Update and Implementation: Lower San Joaquin River and Southern Delta. Available at:
https://www.waterboards.ca.gov/bay_delta/bay_delta_plan/water_quality_control_planning/. Accessed June 11, 2025. 131 San Francisco Public Utilities Commission (SFPUC). 2024. San Francisco Public Utilities Commission Alternative Water Supply Plan. February. Available at: https://www.sfpuc.gov/sites/default/files/about-us/policiesreports/AWS%20Report%20Feb2024_web.pdf. Accessed June 11, 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
85 As required by the DWR, CalWater has analyzed the long-term reliability and vulnerability of its water supplies and developed a combination of supply alternatives and conservation planning efforts to meet the water supply needs of its customers in the South San Francisco District. CalWater has developed water supply estimates for normal year, single dry year, and multiple dry year scenarios based on the existing Bay-Delta Plan.
132 Table 3-11, Water Supply and Demand Estimates for Normal Water Years, shows the projected water balance for a normal dry year through 2045. Table 3-12, CalWater Water Supply and Demand Estimates for Multiple Dry Years, shows the water balance for the first 5 years of a multiple dry year sequence under the 2020 Urban Water Management Plan, South San Francisco District. 133 As
shown in Table 3-11, CalWater has adequate water supplies to meet a normal year demand.
Table 3-10. Water Supply and Demand Estimates for Normal Water Years Drought Year Supply/Demand Totals* 2025 2030 2035 2040 2045 First Year Supply Totals 7,543 7,483 7,635 8,000 8,423
Demand Totals2 7,543 7,483 7,635 8,000 8,423
Difference 0 0 0 0 0
Source: CalWater (2021); DWR Table 7-2, Table 7-3. Normal Year Supply and Demand Comparison. * All numbers are in acre feet per year (AFY).
As shown in Table 3-12, CalWater’s multiple dry year supplies are not adequate to meet projected multiple dry year demands. Significant supply shortfalls, ranging from 29% to 38% in the first year of the 5-year dry period to 36% to 45% in the fifth year of the 5-year dry period, are projected. The water supply projections presented above likely represent a worst-case scenario in which the Bay-Delta Plan Amendment is implemented without the SFPUC and the State Water Board reaching a Voluntary Agreement and does not account for implementation of SFPUC’s Alternative Water Supply Program.
Table 3-11. CalWater Water Supply and Demand Estimates for Multiple Dry Years Drought Year Supply/Demand Totals* 2025 2030 2035 2040 2045 First Year Supply Totals 5,678 5,636 5,739 5,917 5,534
Demand Totals 8,009 7,943 8,104 8,429 8,940
Difference -2,331 -2,307 -2,365 -2,574 -3,406
Second Year Supply Totals 5,095 5,059 5,082 5,291 5,534 Demand Totals 8,009 7,943 8,104 8,429 8,940
Difference -2,914 -2,884 -3,022 -3,138 -3,406
Third Year Supply Totals 5,095 5,059 5,082 5,291 5,534
Demand Totals 8,009 7,943 8,104 8,429 8,940
Difference -2,914 -2,884 -3,022 -3,138 -3,406
Fourth Year Supply Totals 5,095 5,059 5,082 4,874 4,941 132 State Water Resources Control Board (State Water Board ). 2018. Water Quality Control Plan for the San Francisco Bay/Sacramento-San Joaquin Delta Estuary. December 12. Available at:
https://www.waterboards.ca.gov/plans_policies/docs/2018wqcp.pdf. Accessed June 2025. 133 California Water Service (CalWater). 2021. 2020 Urban Water Management Plan, South San Francisco District. June.
Available at: https://www.calwater.com/docs/uwmp2020/SSF_2020_UWMP_FINAL.pdf. Accessed March 21, 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
86 Drought Year Supply/Demand Totals* 2025 2030 2035 2040 2045 Demand Totals 8,009 7,943 8,104 8,429 8,940
Difference -2,914 -2,884 -3,022 -3,555 -3,999
Fifth Year Supply Totals 5,095 5,059 5,082 4,874 4,941
Demand Totals 8,009 7,943 8,104 8,429 8,940
Difference -2,914 -2,884 -3,022 -3,555 -3,999
Source: CalWater (2021); DWR Table 7-4, Table 7-5. Multiple Dry Year Supply and Demand Comparison. * All numbers are in AFY.
The new park would have minimal water use for landscaping irrigation and the potential new restroom.
The potential restroom would use a maximum of 500 gpd (0.18 mgd), which is less than 0.01% of the City’s total water demand per day. Landscaping would include native and low-water plants to reduce irrigation demand. The new park would represent a minor increase in water demand. Therefore, this impact would be less than significant, and mitigation is not required. c) Would the project result in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the project’s projected demand in addition to the provider’s existing commitments?
Less than Significant. As discussed Impact Discussion XIX(a), SSWQCP receives average dry weather flow of approximately 9 mgd and has a wastewater treatment plant capacity of up to 13 mgd in average dry weather flow.134 If the potential restroom is included, the project would result in a relatively minor increase in wastewater production. However, the project would not result in an increase in residences or employment that would bring more people to the area, and wastewater production increases related to the park would be small. Therefore, this impact related to increased wastewater production would be less than significant, and mitigation is not required.
d) Would the project generate solid waste in excess of State or local standards, or in excess of the capacity of local infrastructure, or otherwise impair the attainment of solid waste reduction goals?
Less than Significant. Solid waste pickup is provided to the project area and the City by South San Francisco Scavenger Company (Scavenger), which provides pickup of residential and commercial garbage, recyclable material, organic waste, and food waste and diverts construction and demolition debris, wood waste, plastics, commercial food waste, and other materials for recycling. 135 Scavenger also
operates a state-of-the-art transfer station and materials recovery facility as well as an anaerobic digestor facility that processes organic waste to compressed renewable natural gas for use in the company’s collection trucks.
136,137
134 City of South San Francisco. 2025. Water Quality Control Plant Division. Available at:
https://www.ssf.net/Departments/Public-Works/Divisions/Water-Quality-Control-Plant-Division. Accessed July 11, 2025. 135 South San Francisco Scavenger Company. 2025. About Us. Available at: https://ssfscavenger.com/about-us/. Accessed June 11, 2025.
136South San Francisco Scavenger Company. 2025. History. Available at: https://ssfscavenger.com/about-us/history/. Accessed June 11, 2025.
137 Goldstein, Nora. 2018. Facilitating Food Waste Digestion. Published in BioCycle. May. Available at:
https://www.biocycle.net/facilitating-food-waste-digestion/. Accessed June 11, 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
87 Solid waste is transported to the Corinda Los Trancos Ox Mountain Sanitary Landfill for recycling, composting, and disposal.138 The landfill is permitted to receive 3,598 tons of waste per day and has an anticipated closure date of 2034.139 As of 2021, the landfill had a remaining capacity of 17,240,000 tons.
The project would be required to adhere to South San Francisco Municipal Code Section 15.60.030, Diversion Requirements, which requires contractors to divert construction and demolition debris in a manner that complies with CALGreen. In particular, the project must submit and follow a Waste Management Plan that includes the following:
(1) Deconstructing and salvaging all or part of the structure as practicable; and (2) Directing one hundred percent of inert solids to reuse or recycling facilities approved by the city; and
(3) Either:
(a) Taking all mixed construction and demolition debris to mixed construction and demolition debris recycling facilities approved by the city and taking all sorted or crushed construction and demolition debris to approved facilities, or (b) Source separating noninert materials such as cardboard and paper, wood, metals, green waste, new gypsum wallboard, tile, porcelain fixtures, and other easily recycled materials, and directing them to recycling facilities approved by the city and taking the remainder to a facility for disposal. In this option, calculations must be provided to show that the minimum amount of debris as specified by Section 4.408 of Chapter 4 of CALGreen has been diverted. (Ord. 1532 § 1, 2017)140
The landfill has a remaining capacity of approximately 45 million cubic yards and is expected to operate until 2034. The project would divert construction and demolition debris as required, and the landfill would have adequate capacity to receive the remainder during the construction phase of the project because the construction phase of the project would be temporary and would generate a limited amount of solid waste. Development of the required Waste Management Plan would ensure this impact is less than significant. Operation of the project would generate a minimal amount solid waste from trash and recycling facilities located on-site for park users. This would not generate waste in excess of state or local standards or in excess of the capacity of local infrastructure, or otherwise impair the attainment of solid waste reduction goals. Therefore, this impact would be less than significant, and mitigation is not required.
138 Everything South City. 2021. Must Read Tips from our South City San Francisco Scavenger Company. Available at:
https://everythingsouthcity.com/2021/06/must-read-tips-from-our-south-san-francisco-scavenger-company/. Accessed June 11, 2025.
139 California Department of Resources Recycling and Recovery (CalRecycle). 2025. SWIS Facility Detail. Corinda Los Trancos (Ox Mtn) (41-AA-0002). Available at: https://www2.calrecycle.ca.gov/SolidWaste/SiteActivity/Details/1561?siteID=3223.
Accessed June 11, 2025.
140 City of South San Francisco. 2017. City of South San Francisco Construction and Demolition Waste Management Plan.
Available at: https://www.ssf.net/files/assets/public/v/1/economic-amp-community-development/documents/construction-anddemolitio.pdf. Accessed July 10, 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
88 e) Would the project comply with federal, state, and local management and reduction statutes and regulations related to solid waste? No Impact. The project would adhere to all federal, state, and local management and reduction statutes and regulations related to solid waste. The applicant would require the contractor to adhere to the City’s Waste Management Plan for disposal of construction debris, including recycling at least 75% of clean asphalt and concrete. During operation, the new park would install recycling and composting waste containers to promote waste diversion from landfills, and water bottle refill stations to promote reusable water bottles. Therefore, the project would meet all City requirements for recycling during operation, and no impact would occur.
XX. Wildfire
Environmental Issues
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
If located in or near state responsibility areas or lands classified as very high fire hazard severity zones, would the project:
(a) Substantially impair an adopted emergency response
plan or emergency evacuation plan? ☐ ☐ ☐ ☒
(b) Due to slope, prevailing winds, and other factors,
exacerbate wildfire risks, and thereby expose project
occupants to, pollutant concentrations from a wildfire
or the uncontrolled spread of a wildfire?
☐ ☐ ☐ ☒
(c) Require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency
water sources, power lines or other utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment?
☐ ☐ ☐ ☒
(d) Expose people or structures to significant risks,
including downslope or downstream flooding or
landslides, as a result of runoff, post-fire slope
instability, or drainage changes?
☐ ☐ ☐ ☒
Environmental Evaluation
a) If located in or near state responsibility areas or lands classified as very high fire hazard severity zones, would the project substantially impair an adopted emergency response plan or emergency evacuation plan?
No Impact. A significant impact may occur if a project is located in proximity to wildland areas and would pose a potential fire hazard, or affect an adopted emergency response plan or emergency evacuation plan in the event of a fire. CAL FIRE maps FHSZs in SRAs, as well as Very High FHSZs in LRAs. The project site is in an LRA and is under the jurisdiction of the SSFFD. There are no Very High FHSZs mapped in South San Francisco.141 San Bruno Mountain, 0.4 mile northwest of the project site, is 141 California Department of Forestry and Fire Protection (CAL FIRE). 2025. Local Responsibility Area Fire Hazard Severity Zones: City of South San Francisco – San Mateo County. Updated February 23. Available at:
https://calfire.app.box.com/s/wahuw9ny7cgn89xpxh7092ur50r1pwvj/file/1785859153686. Accessed June 3, 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
89 in a Moderate FHSZ in an SRA.
142 The project would construct a new neighborhood park with irrigated landscaping and would not draw additional people to an area subject to wildland fires. Therefore, no impact would occur and the project would not result in an impact to emergency response or an evacuation plan.
Project construction would include street and/or lane closures on Pine Avenue, 7th Lane, and 8th Lane and may require street or lane closures on Linden Avenue. However, the project would obtain an encroachment permit for road or lane closures and would abide by all City policies, including development of a Traffic Control Plan. The project would not interfere with an adopted emergency response or evacuation response plan. Therefore, no impact would occur. b) Due to slope, prevailing winds, and other factors, if located in or near state responsibility areas or lands classified as very high fire hazard severity zones, would the project exacerbate wildfire risks, and thereby expose project occupants to, pollutant concentrations from a wildfire or the uncontrolled spread of a wildfire?
No Impact. The project is not located in or near SRAs or lands classified as Very High FHSZs. The project would create a new neighborhood park and would not include elements that would exacerbate wildfire risks. Therefore, no impact would occur.
c) If located in or near state responsibility areas or lands classified as very high fire hazard severity zones, would the project require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency water sources, power lines or other utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment?
No Impact. The project is not located in or near SRAs or lands classified as Very High FHSZs. The project would create a new neighborhood park and would not extend facilities that would exacerbate wildfire risks. Therefore, no impact would occur.
d) If located in or near state responsibility areas or lands classified as very high fire hazard severity zones, would the project expose people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post-fire slope instability, or drainage changes? No Impact. The project is not located in or near SRAs or lands classified as Very High FHSZs. The project would create a new neighborhood park and would not expose people or structures to significant post-fire risks. Therefore, no impact would occur.
142 California Department of Forestry and Fire Protection (CAL FIRE). 2024. Fire Hazard Severity Zones in State Responsibility Area. Effective April 1. Available at: https://calfireforestry.maps.arcgis.com/apps/webappviewer/index.html?id=988d431a42b242b29d89597ab693d008. accessed June 3, 2025.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
90 XXI. Mandatory Findings of Significance
Environmental Issues
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
(a) Does the project have the potential to substantially degrade the quality of the environment, substantially
reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal
community, substantially reduce the number or
restrict the range of a rare or endangered plant or
animal or eliminate important examples of the major
periods of California history or prehistory?
☐ ☒ ☐ ☐
(b) Does the project have impacts that are individually limited, but cumulatively considerable? (“Cumulatively
considerable” means that the incremental effects of a
project are considerable when viewed in connection
with the effects of past projects, the effects of other current projects, and the effects of probable future
projects)?
☐ ☒ ☐ ☐
(c) Does the project have environmental effects which
will cause substantial adverse effects on human
beings, either directly or indirectly?
☐ ☒ ☐ ☐
Environmental Evaluation
a) Does the project have the potential to substantially degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, substantially reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory?
Less than Significant with Mitigation Incorporated. The project would construct a new neighborhood park in an urban setting. The city of South San Francisco is located within the South Bay of San Mateo County and is highly urbanized. Accordingly, the potential for candidate, sensitive, or special-status species or habitats is low within the City limits. As described in Section IV, Biological Resources; Section V, Cultural Resources; and the preceding analyses, no significant unmitigable impacts to the environment would result. The implementation of Mitigation Measure BIO-1; Mitigation Measures CUL-1, CUL-2, and CUL-3; Mitigation Measure GEO-1; Mitigation Measures HAZ-1, HAZ-2, and HAZ-3; Mitigation Measure NOI-1; and Mitigation Measure TCR-1 would minimize impacts to nesting birds; undiscovered cultural, archaeological, and paleontological resources; geology and soils related to ground failure; hazards and hazardous materials related to soil contaminants (lead); construction noise; and tribal cultural resources to less-than-significant levels. The project does not include significant fish or wildlife habitat or known cultural resources. Based on these findings, the City hereby finds that impacts related to degradation of the environment, biological resources, and cultural resources would be less than significant with mitigation measures incorporated.
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
91 b) Does the project have impacts that are individually limited, but cumulatively considerable? (“Cumulatively considerable” means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects)?
Less than Significant with Mitigation Incorporated. Cumulative environmental impacts are multiple individual impacts that, when considered together, would be considerable, or would compound other environmental impacts. Individual impacts would potentially result from a single project or multiple separate projects that would potentially occur at the same place and point in time or at different locations and over extended periods of time. The proposed project would not result in individually limited or contribute to cumulatively considerable significant impacts. As discussed in Sections I through XX, all short-term environmental issues would result in either no impacts, less-than-significant impacts, or lessthan-significant impacts with mitigation measures incorporated with the implementation of the project.
Construction of the proposed project could result in some short-term temporary impacts such as impacts to air quality from dust and engine exhaust, nesting birds, and previously undiscovered cultural, archaeological, paleontological, and tribal cultural resources and impacts related to seismic-related ground failure, construction noise, and hazards related to soil contaminants (lead), but those would be temporary and/or less than significant with mitigation measures incorporated. In summary, the project’s contribution to potential cumulative impacts related to these other issues would be less than cumulatively considerable.
c) Does the project have environmental effects which will cause substantial adverse effects on human beings, either directly or indirectly? Less than Significant with Mitigation Incorporated. Based on the nature and scope of the project and the analysis of the project’s impacts, as summarized in Sections I through XX, no environmental effects have been identified in this IS/MND that would cause substantial adverse effects, either directly or indirectly, on human beings. There would be a variety of other potential effects during construction, including:
• Impacts to nesting birds associated with construction activities and minor tree removal (discussed in Section IV, Biological Resources)
• Adverse impacts to prehistoric cultural resources and potential unknown human remains (discussed in Section V, Cultural Resources);
• Earthwork and construction-related impacts due to the potential for seismic ground shaking (discussed in Section VII, Geology and Soils)
• Construction noise-related impacts (discussed in Section XIII, Noise) • Impacts related to disposal of hazardous materials (discussed in Section IX, Hazards and Hazardous Materials);
• Impacts related to the disruption of emergency response from construction traffic discussed in Section XVII, Transporation; and
• Adverse impacts from construction activities to tribal cultural resources (discussed in Section XVIII, Tribal Cultural Resources).
In addition, the project could result in exposure of nearby single-family and multi-family residences to increases in ambient noise levels and nuisances associated with temporary construction-related noise New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
92 (discussed in Section XIII, Noise), which would be considered less than significant with incorporation of mitigation measures and compliance with local noise ordinances.
Most of these impacts would be temporary and intermittent, and all of these impacts would be less than significant based on compliance with applicable federal, state, and local regulatory requirements and established impact thresholds, as well as the implementation of mitigation measures. And while the proposed project could involve the handling of hazardous materials in a manner that poses unusual risks, and any hazardous impacts associated with exposure of construction workers to potential harmful contaminants in soils or demolition debris, impacts would be mitigated through the implementation of mitigation measures. The proposed project would not result in long-term air quality or traffic hazards.
Based on the analysis in this IS/MND, the City finds that direct and indirect impacts to human beings would be less than significant with mitigation incorporated.
APPENDIX A
Site Design Plans and Final Concept Plan
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
LINDEN AVENUE PINE AVENUE
8TH LANE
7TH LANE
CALIFORNIA AVE NEW PARK AT LINDEN AND PINE AVE SCHEMATIC DESIGN ISSUED: MAY 21, 2025 AREA MAP VICINITY MAP PROJECT SITE PROJECT SITE Not to Scale Not to Scale DRAWING INDEX LANDSCAPE ARCHITECT MOORE IACOFANO GOLTSMAN, INC. 800 HEARST AVENUE BERKELEY, CA 94710 TEL: 510/845-7549 FAX: 510/845-8750 CIVIL ENGINEERING BKF ENGINEERS 1730 N. FIRST STREET, SUITE 600 SAN JOSE, CA 95112 TEL: 408/467-9100 LIGHTING ELECTRICAL ENGINEERING INTERFACE ENGINEERING 49 STEVENSON ST, SUITE 660SAN FRANCISCO, CA 94105 TEL: 415/489-7240 STRUCTURAL ENGINEER DAEDALUS STRUCTURAL ENGINEERING 3031 TISCH WAY, TISCH TOWER SUITE 110 SAN JOSE, CA 95128 TEL: 408/517-0373 TRAFFIC ENGINEER HEXAGON TRANSPORTATION CONSULTANTS, INC. 100 CENTURY CENTER COURT, SUITE 501 SAN JOSE, CA 95112 TEL: 408/971-6100 COST ESTIMATOR MACK5 1000 BROADWAY, SUITE 260 OAKLAND, CA 94607 TEL: 510/595-3020 PROJECT TEAM G0.0 COVER SHEET L1.1 MATERIALS AND DETAIL REFERENCE PLAN L4.1 IRRIGATION PLAN C1.1 EXISTING CONDITIONS C2.1 DEMOLITION PLAN C3.1 SITE PLAN C4.1 GRADING AND DRAINAGE PLAN C5.1 UTILITY PLAN C6.1 STORMWATER MANAGEMENT PLAN SHEET NO. SHEET NAME NORTH NORTH SHEET TITLE PROJECT TEAM: CHECKED BY DATE SHEET DRAWN BY JOB NO. 5/21/2025 30923 CONSULTANT: LANDSCAPE ARCHITECT MOORE IACOFANO GOLTSMAN, INC. CIVIL BKF ENGINEERS STRUCTURAL DAEDALUS TRAFFIC HEXAGON ELECTRICAL INTERFACE COST ESTIMATION MACK5 NEW PARK AT LINDEN AND PINE AVE 616 & 700 LINDEN AVE, SOUTH SAN FRANCISCO, CA 94080 www.migcom.com 800 HEARST AVENUE BERKELEY, CA 94710 TEL 510/845-7549 FAX 510/845-8750 LANDSCAPE ARCHITECT MOORE IACOFANO GOLTSMAN, INC. DATE REVISION 5/21/2025 SD STAMPJETM COVER SHEET G0.0 SOUTH SAN FRANCISCO, CA GENERAL CIVIL LANDSCAPE t , Pa l v, 'Q0.
.
v.
1-¢r
as ~¢
v
d
j
9. é §' *
I
W.
Q. I f 1. i
w 1-e
1 I
I
I
I
/-..
I
I
I
I
*s~,~=l* r"
.
»
FF
.
.
r.
,
r r.
TP
¢ ..,
;. , R l
"I la
1. ,L.
G
.
,
4 ~J
-I***..i
'Ra
.
..
»
a
~-;._.
i"q'* .
*I
!i§§,;."`! g
,g
I
'E
:
t
4 h ),,. u FL , .,
*f
1 "E'LT
Q
ii
I
I
u . of I -4 »
lm.,
Etg *i
q
I
i
1/
I
I
I
I
.~@
I
of;5
n
"
of' .!:
'
l
o up
f' ,. FN
\
.
\ . r
Ja
n
m
\
..
.
»
1 1:/.
. ..
.
. se
. .. .7?
*
'
.F
r
*
.
A
.
.
.
.
r
U
I
.
!
5 Q;
.1;3I
f
.
.r
..
.
H
l
an
b Q.:
I
M
G
--1
O
>~. aO
01** SAN
%° *P
'Q Jim s`71,. Q
inO
_
O
t
04 \Y*
LIFORS
STOP STOP
ADA
ADA SAFETY SURFACING: 80% EWFSS 20%PIPSS (LAYOUT OF EQUIPMENT PENDING COMMUNITY SURVEY) SMALL LAWN PARKING PA PA PA PA PA PA PA PA PA PA PA PA PAPA PA BR TG TG TG TG TG TG TGPAPA PA LARGE LAWN FITNESS AREA PA PA PA PA LINDEN AVE LINDEN AVE PA
PINE AVE PARKING BIO BIO BIO BIO BIO PLAY AREA
8TH LANE
7TH LANE PA PARKING (EQUIPMENT CHOICES PENDING) PLAZA MOSAIC BANDS (ART COORDINATION PENDING) 4-5 ART COLUMNS WITH STRING LIGHTING OVERHEAD (ART COORDINATION PENDING) SURFACE MOUNTED BENCHES IN EASEMENT ZONE WATER EASEMENT PG&E EASEMENT SEWER EASEMENT (E) PG&E POLE TO REMAIN NEW CROSSWALK EXISTING STREETLIGHTS ALONG LINDEN AVE TO REMAIN (QTY 3) ADDITIONAL PARK LIGHTING TO BE COORDINATED IN DD SUBMITTAL VEHICLE ACCESS FOR CITY MAINTENANCE WITH MOUNTABLE CURB, SCD LEGEND ADA SAFETY SURFACING: ENGINEERED WOOD FIBER (EWFSS) TURF NEW TREE CAFE TABLES & CHAIRS 6' BENCH PICNIC TABLES BIKE RACKS 4' BENCH VEHICULAR CONCRETE, COLORED AT PLAZA VEHICULAR CONCRETE, GRAY DECOMPOSED GRANITE PLAY AREA DECORATIVE FENCING (4' HT.) METAL FENCING AT PROP. LINE (6' HT) LIMIT OF WORK PROPERTY LINE PA PLANTING AREA BIO BIORETENTION PLANTING AREA SAFETY SURFACING: POURED-IN-PLACE RUBBER (PIPSS) BR PEDESTRIAN CONCRETE, GRAY TG 8'x8' TREE GRATE 0 5' 10' 20' SHEET TITLE PROJECT TEAM: CHECKED BY DATE SHEET DRAWN BY JOB NO. 5/21/2025 30923 CONSULTANT: LANDSCAPE ARCHITECT MOORE IACOFANO GOLTSMAN, INC. CIVIL BKF ENGINEERS STRUCTURAL DAEDALUS TRAFFIC HEXAGON ELECTRICAL INTERFACE COST ESTIMATION MACK5 NEW PARK AT LINDEN AND PINE AVE 616 & 700 LINDEN AVE, SOUTH SAN FRANCISCO, CA 94080 www.migcom.com 800 HEARST AVENUE BERKELEY, CA 94710 TEL 510/845-7549 FAX 510/845-8750 LANDSCAPE ARCHITECT MOORE IACOFANO GOLTSMAN, INC. DATE REVISION 5/21/2025 SD STAMPJETM MATERIALS AND DETAIL REFERENCE PLAN L1.1 RESTROOM LOCATION (TBD IF IN PROJECT,DEPENDENT ON FUNDING)
RR
(SINGLE
ADA)
SINK & DF UTIL & STORAGE (N) WIDER SIDEWALK (N) WIDER SIDEWALK I
F
I ..;._
r
V//"""-___
l.l////////
I
I
/
I
/| I
"""\
.
.
.
.
.
.
.
,
n
I
I
m
I
I
3i=3§
k
1%%
I
w "29
.........
I
.................................................................... ........................................................ ........ ........ ............. ...................... IIItIrrIII I
4..
T
,/
l
,
,
I
|,r
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 'f. . .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
\
II
.
. -"Vu--.
V..
\
\
\
( Il
Y
\
IIIIIIIII
><
/
(
Q
)
) In
)
2 l
a1gIII
__,____.gI ............ .................... ......................... lllIII -
rI
I
I
.
\l
{
III
1 MI //
Q
L
.
/
/
///
/
III
E I I I| |I
ld4
I | l i | i I : I
/~
<L
~.b
/`
w
#1
.
w
/~FH l OA| I s.
no!
L,-
M
G
o*" SAN
%o
'Q 4"
.@~¢
O
>~< :O
'1
4»Q(D0o
-.-
~»-»\
_
04 ` \Y*
L1Fo!®
Z
(°\
STOP STOP
ADA
ADA SMALL LAWN PARKING LARGE LAWN FITNESS AREA LINDEN AVE LINDEN AVE
PINE AVE PARKING PLAY AREA
8TH LANE
7TH LANE PARKING PLAZA PROPOSED LOCATION FOR PARK IRRIGATION EQUIPMENT; WATER METER, BACKFLOW PREVENTER AND PEDESTAL MOUNTED CONTROLLER. POSSIBLE AREA FOR RELOCATION OF STREET BIORETENTION PLANTER IRRIGATION EQUIPMENT EXISTING LOCATION OF STREET IRRIGATION EQUIPMENT; WATER METER, BACKFLOW PREVENTER AND MASTER VALVE/FLOW SENSOR TO BE RELOCATED. EXISTING LOCATION OF STREET IRRIGATION PEDESTAL CONTROLLER TO BE RELOCATED. W 0 5' 10' 20' SHEET TITLE PROJECT TEAM: CHECKED BY DATE SHEET DRAWN BY JOB NO. 5/21/2025 30923 CONSULTANT: LANDSCAPE ARCHITECT MOORE IACOFANO GOLTSMAN, INC. CIVIL BKF ENGINEERS STRUCTURAL DAEDALUS TRAFFIC HEXAGON ELECTRICAL INTERFACE COST ESTIMATION MACK5 NEW PARK AT LINDEN AND PINE AVE 616 & 700 LINDEN AVE, SOUTH SAN FRANCISCO, CA 94080 www.migcom.com 800 HEARST AVENUE BERKELEY, CA 94710 TEL 510/845-7549 FAX 510/845-8750 LANDSCAPE ARCHITECT MOORE IACOFANO GOLTSMAN, INC. DATE REVISION 5/21/2025 SD STAMPJETM IRRIGATION PLAN L4.1 I 31O
r
|'
1 -E
Q
- _-n
_
_
.
H
_ -==._ --
_
- /`a
i.___.._...___.._...___.._..._-,._.._.... [
_
.
`\
Y/\ ::a .
..
.
KJ 1-)
.
®
/'.
.2)
III
) IIIII
°§°g§§°
o° 00°
\
I
_- II
II
.=--_- ! ! ......... ........ .
I- IIIII
I
4 'F' I u E E
r----
1 I
I
I
I
I
I
I
I
I
I
I
I
l.----J
/
I
El
£5
I
I
e
w@@@@@@
/
\-
I
_
/
-
.'
ff
Wmaw ....... /
11 M
I
1 .U.
II
E
i . M
G
Q
t
O
>~:O
o*i*' SAN
%re 4H
JL. 46r
onOO
Qt
` \Y*
LIFO\{
m
- - - -
- - - -
- - - -
- -
- -
- -
- - - -
- - - -
- - - -
- -
- -
- - EXISTING CONDITIONS C1.1 SHEET TITLE PROJECT TEAM: CHECKED BY DATE SHEET DRAWN BY JOB NO. 05/22/2025 30923 CONSULTANT: LANDSCAPE ARCHITECT MOORE IACOFANO GOLTSMAN, INC. CIVIL BKF ENGINEERS STRUCTURAL DAEDALUS TRAFFIC HEXAGON ELECTRICAL INTERFACE COST ESTIMATION MACK5 NEW PARK AT LINDEN AND PINE AVE 616 & 700 LINDEN AVE, SOUTH SAN FRANCISCO, 94080 www.migcom.com 800 HEARST AVENUE BERKELEY, CA 94710 TEL 510/845-7549 FAX 510/845-8750 DATE REVISION 5/21/2025 SD STAMP 1730 N. FIRST STREET SUITE 600 SAN JOSE, CA 95112 (408) 467-9100 www.bkf.com C.A. C.A/J.H. C1.1 EXISTING CONDITIONS I I IQ u;
I I
J:
O
-y
l
I
C
z
o
i
O
I
l
y
rQ
I:
I O
o(D
Q
0 C,
Q
I
II ACI
./'
/
/
V
u: T
/of
-Y Y-- -Xx»x \~ ,:,.; _ .>¢. x:
S 15'55'00" W 140.04'
ONCRETE
RIVEWAY
APN
T 24560
RODRIGUEZ
JOSE &
BEATRTZ TRUST
O STORY STUCCO HOUSE
N
/I//I///I//!/I//////I//)/I rrzf
§5327'
,o.
I
I
r
IIII
I
OLLARD
I
(Q
I
I
O
CJ
ASS
I
I cu
Ion
i i
o
ll
6 u.l
Z
<
_I
I
|-oo
0 V;
<<<9
Q
l
U
O
l
U
II
23 OOO
ii
I=o
O
9'
<r
l\
Iz
I
\GRASS
\
\
\
*WDE
S/OEM/40V
V
OCJ
IQ
<.a
III
.LJ.D
3 .l.l
I
BOLLARD
BOLLARD
\
I
COMM- 00MM- COMM
-6- GLD
MM COMM-
-G G
comm COMM- COMM' COMM- C0|JM- COMMG in `d " | .- G- ,, G4 GAS C \.
42" CONCRETE GUTTER
--- -. -.-
S W 5°33'00" W 140.04
42" CONCRETE GUTTER
FACE OF CURB
G i s-iv»L°
PLANTER
LIP OF GUTTER
LJLJ
LOWERE
L.l
LINDEN AVE
I
L.l
w W
l..l
w
-kg
W- wGUTTER
12" AC W
*L LL."l\ILl\LIL
I
-I
<1
Ld i
Ld
1 O
Z
O
L)
Lu -T
Q
>
\
I
|-
H /
D,
32 EZ
OO
LIJ
Q
3 'n
AC
I
/
/
/
I
S male W
60.00'
T
W
I /\
/-FACE OF }ZURB
I
n
M
\ x
\/"
W
H
\
mw
mm
U)
m
U)
m
I
in
U)
\
I
win i
E
|-|-
3 CD
LIJ
|--
LIJ
an
(_)
g
O
`>
/
/
QUO
o
4 NO
|-
_oil
I
I
/
I
3a
I
III
Q
/
;
;
I
31 /
n
|
=
M.O
P OF GU
W
LIP/O GUTTER
. . . . . . . . . . . . . . . . . . . . . . .
\
\
\
\
.
no
TWO STORY STUCCO BUILDII\
. . . . . . .
APP
012 4560
RODRGUEZ
JOSE &
BEATRIZ TRUST
N 15'33'OO" E 140.02'
1,5113
no W no nu
II
\
II
z r r r r r r f f r r f f
E -----
--- \/ -
-_
\\
\., ..._.__cLusTEr
-6v\\0\
O
0*/\
0\\<)~
/
\
\
o o |
|
\
I O~\
\
Q
i
II
"o
oo
O
in g
I;
In
l\
S`!
<r
l\
Z
II
u.l
z
<
_I
I
II\
III
I
l
.
.
.
.
.
.
.
J
c>
TII
I
I
D
5 ll
I
£1
l
I
o
go; 1n
I
I q in
mi
comm cauu
QUO H
in no
PLANTER
\
WiDE LOWERED CURB
llllllllll
L;
COMM cow»1- COMM- COMM- comm- comm- H COMMnu
o U av- -c0|nm OHM COMM COMM . nw o .
O:0
I °'I'L2,1,:,
oqgou
G G G G-
\.
l
I /
n 5g}§.z,"6
/2 J
/
G G
CONCRETE
GUTTER
$D5*v'v"r5§Ut6*V'v*EREIB--€'o*F&§' SD
w w- w- w- wL- --- -36" CONCRETE GUTTER
P_ANTER
SS SS
APN APP
re *I in I A re e E re
APN
no 14" RCP in(no 18" RCP lN(NW)'49.2Q
no 18" RCP OUT (SW)l48.99
I
I
:
o
:
o
I
s
I
lNV
\my
6" VCP iN6" VCP OUT
(W)
(N)
(E)
47,7048,2046.80
APN APN
04 '/ll CO
APN APP
LEGEND SURVEY NOTES
QUOg
'O GJ
'O
>< -LL.l GJ
I
N
o- C-J U
| (.)
O
/"
CJ>-
vm
an
a
com
|+-
-clGOO
- -J
-EL-D
3 o.
o
<1
/LO
§l`
mm
I-cv
Lb
LJCDLl-.l
E
<r..
ZLLJ
ICD 4
ZO
O
LE O
Q
75 K
\
-OG
-ALD IVE Y
YY
WEWE O
O
WE L O
VE
VETR
TE
BE VE
,-llm.m §@
BE
*
TH VE T n-I
OR
AN pa
w T
WN n-I
111 TY
FR C,
00K 2{)F
E TLED
TE . TFOF LF
TH
ILE
TH
TH FFI
ORTTll
TH
VE .
LE
TH m TTI TH VE TU Vu VE EET.
TB .
ED
T WELL
FE T
TE :
TEOF VE :
wn FE L TH OF.
WN 'JE
TE
TH
TU
T EE TE
SE
TR
Tlll
VE L TH 1nrp
WN ITY
TH TYP ,
TH TY
OR
LEFF
WN Tll
1 GRAPHIC SCALE
-
M G
or!
~-%'*'£»">»
O
>-
:
O
o*i*' SAN
%s £4
r
on
O
O
Qt \Y*
LIFO\{
ECQi-1
of.
DEMOLITION PLAN C2.1 SHEET TITLE PROJECT TEAM: CHECKED BY DATE SHEET DRAWN BY JOB NO. 05/22/2025 30923 CONSULTANT: LANDSCAPE ARCHITECT MOORE IACOFANO GOLTSMAN, INC. CIVIL BKF ENGINEERS STRUCTURAL DAEDALUS TRAFFIC HEXAGON ELECTRICAL INTERFACE COST ESTIMATION MACK5 NEW PARK AT LINDEN AND PINE AVE 616 & 700 LINDEN AVE, SOUTH SAN FRANCISCO, 94080 www.migcom.com 800 HEARST AVENUE BERKELEY, CA 94710 TEL 510/845-7549 FAX 510/845-8750 DATE REVISION 5/21/2025 SD STAMP 1730 N. FIRST STREET SUITE 600 SAN JOSE, CA 95112 (408) 467-9100 www.bkf.com C.A. C.A/J.H. C2.1 DEMOLITION PLAN I
U
I
II
10' PG&E OVERHEAD uns EASEMENT
NO TREES WITHIN 12' OF POLENO 25' OR TALLER TREES WITHIN 15'
OF DISTRIBUTION LINE
NO 40' OR TALLER TREES WITHIN 50'
OF DISTRIBUTION LINE
I
II
o
I
o
I
o
U)U)U)
m
l
;
g3
I
II
I
l
l
I
l
PROTECT Ex. FENCE
vi
74 74
74 a
vi
I
O
T T
I
ofm
I
I
I
x I
l
I -L
V
EX. FENCE TO BE REMOVED (AND
REFLACED AS PART OF PROJECT)
__________- __________- __________- __________-
u.lz
<
_I
IIoo
l
cAuTion-(E) 2
GAS LINE
Ex. PG&E
JOINT POLE
TO REMAlN
J
>1
l/
OHM COMM C:
-G G GPROTECT Ex.
STREETUGHT
PROTECT EX. 2"
/-GAS LINE
|\\
Ex. EOLLARD TO
BE REMOVED
I
EX. BOLLARD TO
BE REMOVED
\l/ \I/ \l/
\v \I/ \L
\l/
-EX. AC TO BE REMOVED n n
EX. AC SIDEWALK TO BE
REMOVED
\L/ \1/
\1/
\I/
\l/
\1/
\I/
w
V
\v \I/
\i/ \I/ \L/
\l/ \I/ \1/
\I/ \I/ \I/ \I/ \I/
V \v \I/ \v \I/
\i/ \I/ \L/ \l/ \i/
\1/ \I/ \1/ \I/
\I/ w \l/ w \l/
\v \1/ \v \1/
w W V W
\l/ W W
v' \l/ V \l/
w w w w
v W v
W \l/
\l/
\1/
W
W v w w
w v W v
/ \l/ \1/ \l/
/ \l/ V
EX. DRIVEWAY TO "
REMOVED
\1
II
Iin
.
II
IIII
W I
\l/
V
EX. SIGN TO BE
REMOVED
EX.
v
g i
\v \1/ \v \I/ w o
\1/ \i/ \I/ J/ \l/ \v
EX. OH SERVlCE LINE vi
\I/ \l/ *V FOR 234 PaNE AVE TO v
BE RELOCATED \;
10' PGAcE
I OVERHEAD LINE
o
_
\\\` I
V
T
f .
w
O I
74 TREE TO BE
REMOVED
vi
Lf
lb
Q
OO
5' SEWER
E: EASEMENT
w
v :
+
+
EASEMENT 1
PROTECT EX, JOINT POLE
al
v4§
+
~,(-.
EX. AC TO BE
REMOVED :
1/ I
\.
/
7 W
B
9 la
<r
|\
I
I
I
FROECT JT LINE
PROTECT ss UNE
I
l
f
I
Z
l l
Ex. DRWEWAY TO BE
REMOVED
V
\|/
w \ W
V V
J J/ W w
V \|/
EX, IRRIGATION METER
TO BE RELOCATED
h
V V
Ex. UTILITY STRUCTURES
TO BE RELOCATED l
I
O
I
O
.IIIIII
I
II
EX. CURB & GUTTER TO
BE REMOVED
II
I,
I)
>>>
J
>
T7
\u \1/ \l/ \l/
w \I/ \i/ \I/
V
W w
of'
EX. BiKE RACK TO BE
REMOVED
I
nnnn
I
nnn
n nnnn nn nV'
I
EX. BENCH TO EE
RELOCATED
EX. SIGN TO BE
REMOVED
I
II A
COM COM mm LAN
I
4 c'As
I'
7 If' T
PROTECT EX
STREETUGHT
PROTECT EX. CURB
Ac GUTTER
PROTECT EX
STREETLIGHT
PROTECT EX
BlORETENT1ON PLANTER
§ALWFAGE5 6I=§ RELCEKTEE. EEE
LIGHTING PLANS FOR DETAILS.
'
°"\\
EX. PARKING METERS (6)
TO BE REMOVED &
SALVAGED
5' WATER
EASEMENT
\
'o
O.
c;>
ca
EX. AC TO BE
1_
REMOVED
V
*o
9 |\
5"
<r PROTECT WATER UNE
/
EX, HEDGE TO EE
'-REMOVED
Ex. PARKING METERS (3)
TO BE REMOVED Ac
SALVAGED EX. CURE TO EE
EX. TREE TO BE
REMOVED
-REMOVED
TYP.
Ex. IRRIGATION
STRUCTURE TO BE
RELOCATED
EX. SIGN TO BE
REMOVED
X coal
>< ""
3><1 XJ we < L
_ _ 1
\ _ J
GG
V
<1
v
PROTECT EX.
'STREEHIGHT
l
PROTECT EX.
-BlORETENT1ON PLANTER
PROTECT EX.
B( GUTTER
CURE
SALVAGE Ex. BiKE RACK,
-CITY TO DETERMINE
SALVAGE REQUIREMENTS,
/
I
II
of
u.l
z
_I
I
Ii
IL'
F'
i?
II
EX. PG&E
JOINT POLE
TO REMAlN
I
l
3 EX. DUMPSTER
TO BE'
RELOCATED
I
5 li
EX, PG&E
JOINT POLE'
TO REMAlN
I
Et
O
71 EX. CURB RAMP
TO BE REMOV
uuu
L
-w w
it
l
12" AC W
w- wcAuTron-(E)4
GAS UNE
PROTECT EX. 4"
GAS LINE
LINDEN AVE
w w
w
Ex. CURB RAMP TO BE
REMOVED
c5
CURB RAMP TO BE
REMOVED
Fw
18"SD
12" AC W
w- wI
ww
I
l
c*
/"
L-
/ I
/ n
/ I
cs
_/
J
/
/
CT'a
'OE
Q
I
D.
-I
I
Cal
O/
C
CD
SDMH
- 54.19
no 14" RCP iN(NE) 49,89
lNV is" RCP lN(NW)'49,29
iv 18" RCP OUT (sw) l4B.99
I
I
:
c
:
;
ql
II
I
SSMH
INVINVINV
6 VCP iN6 VCP iN
6" VCP OUT
(W)
(N)
(E)
47.7048.2046.80
U)CD
O
o
+1
OEG)
-c
o
in
/
in
+1
0.)0.)
-c
in
/
-J
I
(3
ZLl-.l
/
X
L
U
o- an
In
cr.)-3 GJC NGJ C> U
<1 (.)
I
:IG) .
o>-
:ICD
-IQ
ILLJ
LL}-mlmo
1-1
a
LELE
paCal
/LO
pa CalCal I
O Cal
Cal CalLl-.l
E
<r..
ZLLJ
ICD 4
ZO
LEGEND KEYNOTE NOTES
TY
E J
TE
r
VE
TE
VEVE
ITY
x x x x
J
VE
T
TR T
TH ,
ITE T, WN
WN
TY o
T T
TR T
THL X
TR
TH TE TH L TE ITE
TR T TE
T
TH
THVE
TE
T
WN
TR T
L T L
TH
TH
TH L, WH
LE 1
TH
(
11). VE L
TE
LE TR TR WN E
VE
/
TR
TH
TR
TH TY TH
L
WE TR
L TH
TR TH T 1
L
TH T
TH WIT
L
VE
TH
TH
TE ITE. TE
GRAPHIC SCALE
_-
10 0 10 20
M G
or!
~-%'*'£»">»
O
>-
:
O
o*i*' SAN
%s £4
r
on
O
O
Qt \Y*
LIFO\{
EC
Qi-1
of.
STOP
STOP
ADA
ADA ADA ADA SITE PLAN C3.1 SHEET TITLE PROJECT TEAM: CHECKED BY DATE SHEET DRAWN BY JOB NO. 05/22/2025 30923 CONSULTANT: LANDSCAPE ARCHITECT MOORE IACOFANO GOLTSMAN, INC. CIVIL BKF ENGINEERS STRUCTURAL DAEDALUS TRAFFIC HEXAGON ELECTRICAL INTERFACE COST ESTIMATION MACK5 NEW PARK AT LINDEN AND PINE AVE 616 & 700 LINDEN AVE, SOUTH SAN FRANCISCO, 94080 www.migcom.com 800 HEARST AVENUE BERKELEY, CA 94710 TEL 510/845-7549 FAX 510/845-8750 DATE REVISION 5/21/2025 SD STAMP 1730 N. FIRST STREET SUITE 600 SAN JOSE, CA 95112 (408) 467-9100 www.bkf.com C.A. C.A/J.H. C3.1 SITE PLAN II
I
II
II
II
I
II
I
II
II
II
-|
I
U*
'EDO.m
I
O._|
I
it:o
/
U*
é
-1
E
-C
co
/
-1
-C
in
/
_|
I
O
z
Lu
/
x
0. GJ
l'o
3 GJ
C N
GJ C> O
<1 o
I
15>-
:cn
-IQ
Iu.l
LL 1-U11-mo
l-l
:reLELEr.z)cal
/LE
l")(\IallO(\I
C\l(\l
Li)
xo
LIJE
<2u-I
|-
c:)<=:
zaEO
M-1QD.
I
I
VERTICAL
CURB
I
II
VALLEY
GUTTER
I
II
II
1 a.4'
II
19.3'
2 <r1=
oo
I
I
I
l
II
:>
'
/
~
\
6 \ 7.
~,o
,to
o°°
o°° \
L
r
l
r
( ) TR TLI13HT
r T
AS
r
(N) RAMP
PER CITY
STD R-SA
)
X h. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . x.,. -~5v@=e&~= -. Y _.L.x X
(. -;q,q,-;g- -- - -,--
*
/ / / / / / / / /
.
/
___________ / / ,
/ / /
) (-_-.-.--,---- - - _ »!)"5'- )
f _~_____4LtJ_*_
/ /
-f-L/-44/ .
)
Q
?
I
z
,A
/
/
/
/
/
, /
/
/
/
/
/ / /
/
/
/
/
/ / / /
/
/ / /
/ /
/
/ /
/ /
/ /
I / /
/ \
/ /
/ / /'o
/ / / / /
/ /
/ / /
/ / / /
/
/ / / / 2
/ / / /
/ / / /
/
/ / /
/ /
/ /
/ / /
/
/ /
/
/
/
/
/
/
/
/
/ /
4 , .
of "1-.
VAN ACCESSIBLE
STALL AND
LOADING ZONE
t
I
up a
* s
4 a
4 A
4 4
1 1 A 1
I 4
*
4 a
* *
a
4 A l
4 *
• 8
°4
8 4
.
*4 I I\
p
A
*
1 .
4 .
c
a
QB
I
e
, ~
) I
( )
»
n
C&E,
lil
»
ADA CURB RAMP
II
-
/,
/ /
/
/ / /
/ / / /
/ /
/ / //
/ / /
I
/
/
WI1-2
(PED XING)
(ARROW)
I
(n) cu's RAMP, CASE r
PER CALTRANS STD ABBA
o
oooo
ooooo
ooooo
of
/FIRE ACCE$$/WASTE/
ONE-WAY ALLEY
,. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (NO RIGHT TURN)
/
I
Innn
A Q
2*
. I.
I
o
f\ ,
\/
/
\
ca
STOP
f'
SIGN
W1-6(L)
(ARROW) i
I
i
I
L _
K
/ (' co
/ / /\/ , X
/
*O VA
Q / f
C..*0%1M
x
/// '\
/ //
f
/ ///////////// . . . . . . . . . . . . .
1 A
/////
/ / / / / / w /
/ / / /
/
Q]
/ / / \
- »R>4B'
I
WI1-2
(PED XING)
W16-7P
o (ARROW)
2 l '__ / . I
by/ |
A & 1
A
n I
O
V
In =.
. ¢ .
.
. .
.
)
•
-.-
:
(N) CURB RAMP, CASE r,
PER CALTRAN5 STD ABBA
...
......
II
1 III
II
1 III
'Q
no
I
III
i
I
0 .
5 I
I
l
S
l
l R-28`
5 I
\ \
I 3%;
°§3§§§
IIIII
€°§°
o . _ . 0° .
I I
\ I I |
.¢ x 1
%
E *Q
|» %
I 1/
.I 6 I I
6 ./
II
DIRECTIONAL CURB RAMPS,
CASE F. PER CAL ANS
STDQA
4 Q
4 A '¢
/
4. .4./
6 /
/ / .
. '/ /-.¢
Y¢ / ¢
4 /4 .
w¢ . Z
/
4/ .
9/
yof .
¢/ /
/ /
.
///
If -o.'¢-
.0- 04'-
0'//////'
'-- /, /,
1, . . '/
0 // ff/
f/ f/
f/
/AZ 1
/'./
//-//-/_
0 of/ f/
.- / 04-00
».' - /
'"
/ ..
0;0
II//-
I I
I
n
!I
_ .'/ '.
. y..
'///
. 4
0 ' '
'// ` . ' . /
/ 2 .@ /
% 4,2'
// /
Q,
0,
..¢
/
@I
//
f
. / f;
/
\
/ / /
/
||
| .
/as
/ I
/
.Q/ /.////,
/ ,o
/
/
/
,
,
/.0./,/
*T
0, O
/ ,
\i
//
v /
:
P ,
/ Q 0
///// .
*
, //
/// .
/Y
/Q /2
Z .
@
/ /
/
/ ' /,
/
»
. I |/
LL
()
/
l
\~
/
I
( )
WE
A
WAT
EAS VE T L
R
F
or
II
*
l
/ //2
¢
-
VERTICAL
CURB AND
GUTTER
/
,//
r
//
// /
1/ iv 1 1 / /7, "\
\/A///////)~/\
////////y
. . . . . . . . .
. . . . . . .
VALLEY
GUTTER
//
r"\ Rx
n I
4. CAN*
4 a
r~ L)
PROTECT EX.
CURB AND
cunt
1"l
Ni
v
(
D ii
|
4 4 a
LINDEN AVE
/
a
I
4 s
_,__J_ ___
/
/
, / / /
/
/
7% 4
,//
Z
(N)26' WIDE MOUNTABLE .
CURB PER CITY STD R-88
I
A
OO
OOOO
oooooo
\ II coo
I
I
-.-----.>'
*A
A 1 a
:- I
1 =-.
on
*
.
A 4
4. l
i~
l
I
4 l J
PROTECT EX
CURB AND
GUITER
VERTICAL
CURB AND
GUTTER
/
/
/
.L
/
FNTER)
-(n) RAMP
PER CITY
STD R-6A
o 9"
N
II
I
u.l
>
<(
u.l
Z
D.
I
II
I
'r .,;#
it)
_Qad!
I
II
I
,l
GRAPHIC scAI.c
0 5.0' on NON-VAN
_ ACCESSIBLE
4" wins a.o' FOR VAN
BLUE STRIPE ACCESSIBLE
BORDER
I
I
4" MDE
BLUE STRIPE
I N
\
T:
.
-1
ACCESSIBILITY SIGN
LOCATION PER PLAN
3'-O'
r
ACCESSIBLE STALL SYMBOL
(SEE DETAIL BELOW) |'
1/2' RADIUS
BLUE
REFLECTORIZED sloan
CONSTRUCTED ON
PORCELAIN STEEL MTH
BEDDED TEXT OR EQUAL
WHITE PARKING
ONLY
*
oo
4' LONG WHEEL STOP
(SEE DETAIL LEFT BELOW)
1'
II T
VAN-ACCESSIILE
l"Mln. FINE $250"]
"wnmmm¢us»nm-unmlauugmasl'
mwwmwmwwa
lulslvuluzxluvulmnmu.
manuals
2" DIA. GALVANIZED
PIPE SET IN CONCRETE
1a" BELOW GRADE.
TOP OF WALKING
Lu
o
-<
x a
or O:
an on
n I I_o
5 O z
oo
OZ |-
(
3 TY
( ). P I
I I
TE
ITE I I
I I
VEVE
I I I II I
I I
`l'H
gjjjfg
ELLLLJ
I I
TTE
11 -O r;
SIII .n.
s
KEYNOTE NOTES
TE
3' LONG WHEEL
STOP DOWELED we
#4 REBAR 1' O. .
3/4
-1/2"
#4 REBAR
WIFI' nor a.4=1\ou
may
1. ALLnt¢frLsrapsons/rss:-¢ALLBf4'm0m
X
s' DI
WHITE
T-B
1 Ll q.
*¢
;-
4 SURFACE
I II I
Izcnnz >I I I I
I IJ ! J/
L-J;l.
aocwsswssnu svww
NQIE;
1. SLOPE NOT TO EXCEED 2% IN ANY
DIRECTION WITHIN ACCESSIBLE SPACE
1. SIGN TO BE CENTERED ON THE
INTERIOR END OF PARKING SPACE
UNLESS OTHER SHOWN OR NOTED.
1 N
unAumoRI2£D WHCLES PARKED IN Dcsuauren ACCESSIBLE SPACES N01 Ixsvumc nismanisuroc vucuvns on svfau uma PLATES possum FOR PERSGIS VIIH nlswaurzs Vu BE IM AWAY AT OVIBTS sxvmsc.
TOVED VEHICLES MAY BE RECLAIMED AI OR
BY THIPHONNG
row-Any ala:
N .
1. BLANK SPACES SHALL BE FILLED IN W/ APPROPRIATE INFORMATION AS A PERMANENT PART OF SIGN.
2. LETTERING SHALL BE AT LEAST 1' IN HEIGHT3. ACCESSIBLE PARKING SIGNS SHALL CONFORM MTH CURRENT ADA AND CALIFORNIA ACCESSIBLE TITLE-24 CODES AND REGULATIONS CBC 1129 B.5.
N.T.S.
WHEEL STOP ACCESSIBLE PARKING STALL
\ill i
N.T.S.
M G
i
QTY* SAN
@°_%tag . 'P
Q
O
>~<
:
O
'Y
4»
Q(D
re
o
-.-
~»-»\ _
04 ` \Y*
L1FOR
STOP
STOP FF XX.XX GRADING AND DRAINAGE PLAN C4.1 SHEET TITLE PROJECT TEAM: CHECKED BY DATE SHEET DRAWN BY JOB NO. 05/22/2025 30923 CONSULTANT: LANDSCAPE ARCHITECT MOORE IACOFANO GOLTSMAN, INC. CIVIL BKF ENGINEERS STRUCTURAL DAEDALUS TRAFFIC HEXAGON ELECTRICAL INTERFACE COST ESTIMATION MACK5 NEW PARK AT LINDEN AND PINE AVE 616 & 700 LINDEN AVE, SOUTH SAN FRANCISCO, 94080 www.migcom.com 800 HEARST AVENUE BERKELEY, CA 94710 TEL 510/845-7549 FAX 510/845-8750 DATE REVISION 5/21/2025 SD STAMP 1730 N. FIRST STREET SUITE 600 SAN JOSE, CA 95112 (408) 467-9100 www.bkf.com C.A. C.A/J.H. C4.1 GRADING AND DRAINAGE PLAN l
I
I
i
l
`
l
I
l
1 I
I
/
/
/
CONFORM
(TC 52.5:t)
(FL 52.0:t)
I
PV 52,64
1.4%
T=X7¥.- X' ..X... .-¥=X---K-- X X b
C
PV 52.25
*
FL 50,8
=/;,=/=/=
,/ FL_---
FG 51.4
*
I
12 TC 53,13
FL 52.60
/
/
7 FG ,51
E
<E_I:|:
|-
oo
|II
I
l
IIIV
II
l
l
I
l
\
\
\
\
/ \
\
/ \
/
/f .
/ \
/ \
/
/ \
/
/
/ /
/ /
/
I
/4
/
/
/
/
/
/
/
/
/
/
/ \
/
/ \
/
/
/ /
/ /
. /
/
,
/
/
/
/
/
/
/
/ .
/
/ \
1 \
1 /
/
/
/
/ /
, /
/ /
/
/
/
/
/
/
/
/
/
\
\
\
\
1211
u
,r
\
\
\
\
l
I
i
CONFORM
(LG 54.1 i)
FL 54.00
I
// \|
//// \
/o 54.25
F //// FL 53.75
/1'
\
\
\
\
\
\
\
/
//
/
,K\
\
\\
\
\
\
\
N
LO
"F ,r ~
al
I
/
C 54.5"1
I- r A Na
I ®
i /' FL 54.01
I
I
/
/ y'
/ ,- 1
I
I
JO
)CON
too
OOO
o
FG 53.04
PV 54.04
CONFORM
(PV 49.6;t)
CONFORM
(TC 49.21
7:l;) CONFORM
I/ (PV 50.3:t)
\
I
TWO STORY STUCCO HOUSE
I t I »
U L
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . r.
I
C
>= 50; . .
FG 50.8
be -.
="=/?/?
/ . L .-. /- -
CONFORM
(pv 49.7i)
PV 51.30
/
/
/
/ /
/
/
U
PV 51.67
oo
o
LO
>
,Dh
roo
o
Lo
>
DTC 49.61
FL 49.11
l!//.//////Y/
////\
/}/////,, \
///////,7 `\
**E23-iM;
x \
-x
FG 50.8
'iv 59.78- A.A
CONFORM
(TC 49,1i)
(FL 48.4:t)
50.41 FL 49.91
TC 49,41
CC 48.91
TC 49.90
FL 49.40
OFF COR
¢>
T 49.81
PV 49,31
TC 49.65
PV 49.15
TWO STORY STUCCO BUILDING
I
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
CONFORM
I
\;' g;_cLusT@ 'P
(
V 45.9;t)
TT
F F
.-
46.1 be
x
I/5//A/
( 45.5
\
48.15 PV 47.65
w
Q
N
TC 47.85
47.35 N
ogco
l
II
1 l
III
2.0%
_.
4 I
A
i
TC 47,70
PV 47.20
>e *\
PV 47.60
Y)
I
1 II
l
I
TC 46.82
CC 46,32
oh
a
n 1
A
4 q PV 47,70
l
PV 53.39
A
q
A A
lq
C\J
I")
LO
>
CL
A
A
QA
PV 51.90
Q
t I
Q
co
of
O
LO
>
D.
urn
>
n.
n
re
O /
\ .
r 4 l
PV 49.99
¢ '4
> 1
.
l
PV 51.81 PV 51.31
4 SS
S 2.07
/ /
1 /
f
/¢
/
/
f /
. /
. /
/ .
/
/
/
I
/
¢.¢»
Mk
,¢.¢ ,
.¢=¢ 2
/,
// ¢¢ /
/ /
/ / v%
/.
/
, . /3
/
. / /
/""
/ /. //
/ / ¢
,
A /
.4 ¢ 24 ,
/
/
/. /.
/
,
¢¢,/.
/ ,¢r/
¢% 4 /
1/ ¢¢/ .
/.//
/
/
/
//,
/
7 ,
/
/
/
/.
gg
I
R
R
pg
N
r
gg
FP
or
or
R
N
iv
o
R
R
J
PV 54.34 PV 54.54
S
/ '/
/
7 /_
7 ,
/
/
/
/L 1
"Q<r
h
D.
/ /y
/
//
/
///
TC 47.65
PV 47.15
TC 47.85
CC 47.35
\
\
\
\
\
\
)/
\
\
\
\
\
\
\
\
)/
\
\
\
\
\
)/
/
/
/
/
/
/
/
/
/
/
/
/
/ ,
/ /
I /
/
/
/
/
/
/
/
/
/
f
/
/
/
/
/
/ /
/
/ /
/ /
//
\ I
/
\ /
/
/
/
/
/
/
/
/
/
/
/
/
/ /
/ /
4 /
/
//
\ /
/
/
/
/
/
/
/
/
/
/
/
)
/
\
\
\
\
IIIIII
,1
III
TC 48,63
PV 48.13
we
O?
Cal
I
II
UJ
z
<E
_I
:|:
|-
I\
II
TC 48.90
I FL 48.40
I
Xl
Q
JP
ll
ll
II
ll
11 CONFORM , in .
(TC 54.8i)
(FL 54.3:t)
TC 54.61(FL 54.1:!:)
.'lipv 54.64
/\ -
\
N
oo
\-
42" CIEONFORM /TTER
(PV 54,2i)
PV 54».31.._,,
A
s
BW 54,12 i
A M
PV 53.70} .PV 53.64
h
A
4 *
a
h 4
A
q pa
42" CONCRETE GUTTER
*.._.
--._ --..._
--..._
---.-
'---..
--..._ ---_..
'---.
---..
_-.-
---.-
-_.-
---..
'---.. --..._
---.-
-_.-
---.-
"--._ --_..
--..._ --.-...
--.-
FACE OF CURB
A
LIP OF GUTTER
A
*A 1
A
A
A
PLANTER
CONFORM
(TC 54.11)
(FL 53.61\
"pa 53.14
PV 53.14
O0
of
oo
it
MOUNTAELE CURE,
1355 DETAIL R-BB
;TRC 53.92
;(FL 53.4:t)
PV 53.57 A
A
a
* 4
A 4
13 n A
A * Q
PV 53.43
EL/
4 . _
A
36" CONCRETE GUTTE < -
\
FACE\OF~CQRB
I
CONFORM
(TC 53.41)
(FL 52.91)
:URB
..
I
a
as
A
4 t *4
1.8%
1 " an PV 49.80
A
I
A
A
A
/
/
\
LIP OF GUTTER
36" CONCRETE GUTTER
CONFORM
(TC 49.3:t)
(FL 48131)
8" CONCRETE
GUTTER
.I
,u °11
1 UP3
'o
Q
(D
I
It_|
I
YI*a
/
CUPmGJ
O
U
-I-J
oEGJ
-c
U
LU
/
in
-IJ
GJGJ
-c
LU
/
-I
I
CD
Z
LIJ
/
x
Lo
D. cu
l'o
GJ_
I GJ
C NGJ C> o
<n U
I
C
GJ ..
'=:=>-
CCD
-in
ILI-l
LL|-(DIto
l-l
<-[_LOLOpaco
/LO
mmc\II
of
mm
xoLl-l
E
<z..
ZLI_l
|-
CD-ii
zo
ECEC-1GEL
/
42" CONCRETE GUTTER
/
.1
LINDEN AVE
42" CONCRETE GUTTER
WID
LOWERE
CUR
PLANTER
__
\
\
l_Llll
>
<E
u.l
Z
n.
I
II
I
LEGEND KEYNOTE
TR
((
)
)
I_g1QMXg)
VE fr
I It (
)
)
( (1 )
ITE
I
VE .
l
v»
l i
( )
((
)
) I
l l
QUO
WH L
\.
I\ .\ \
I
1.5' WIDE LOWERED CURB /
PLANTER
'36" CONCRETE GUTTER
/
/,
`._
LIP OF GUTTER
/
l
36" CONCRETE GUTT"
/
,al
II
y
II
NOTES
1. DISTANCES BETWEEN BIORETENTION AREAS AND HARDSCAPE ARE SHOWN ON THESE PLANS. ALL BIORETENTION AREAS MUST BE 2 MINIMUM AWAY FROM ALL HARDSCAPE.
2. COORDINATE THE PLACEMENT OF ALL SLEEVES FOR LANDSCAPE IRRIGATION PRIOR TO PLACEMENT OF ANY FLATWORK. SEE SITE LANDSCAPING DRAWINGS.3. ACCESSIBLE PATH OF TRAVEL SHALL BE PROVIDED ON ALL WALKWAYS. TO PUBLIC SIDEWALK AND ACCESSIBLE PARKING. - ACCESSIBLE PATH SLOPE REQUIREMENTS: 5% MAXIMUM LONGITUDINAL SLOPE, 2% MAXIMUM CROSS-SLOPE. MUST BE IN COMPLIANCE WITH CBC 11B FOR ACCESSIBLE PATHS.
4. FOR GRADING RECOMMENDATIONS CONTRACTOR SHALL REFER TO PROJECT "GEOTECHNICAL INVESTIGATION xxx" PREPARED BY XXX DATED xxx.5. DO NOT ADJUST GRADES ON THIS PLAN WITHOUT APPROVAL OF THE ENGINEER/ARCHITECT.e. CONTRACTOR SHALL CONTACT PROJECT'S CIVIL ENGINEER AND PUBLIC WORKS INSPECTOR FOR INSTALLATION AND INSPECTION OF ON-SITE GRADING & DRAINAGE FACILITIES. A LETTER FROM THE CIVIL ENGINEER WILL BE REQUIRED TO CERTIFY THAT GRADING AND DRAINAGE SYSTEMS ARE INSTALLED PER DESIGN PRIOR TD PROJECT ACCEPTANCE.
7. 2"-4" COBBLE STONE ENERGY DISSIPATERS SHALL BE MINIMUM 24»"X24" AREA AS DEPICTED PER PLAN AND TO BE PLACED AT CURE CUTS AND AROUND OVERFLOW DRAINS (OFD) AND BUBBLER BoxEs (BB).
8. ALL SIGNING AND STRIPING SHALL CONFORM TO THE LATEST PROVISIONS OF CA MUTCD. CALTRANS STANDARD PLANS AND SPECIFICATIONS. AND THE CITY OF SAN JOSE STANDARD DETAILS.
9. ALL PAVEMENT STRIPING AND MARKINGS SHALL BE THERMOPLASTIC. THERMOPLASTIC THICKNESS SHALL BE 0.15cJ'.
IO. ACCESSIELE PARKING SIGNS SHALL CONFORM WITH CURRENT ADA AND CALIFORNIA ACCESSIBLE TITLE-24 CODES AND REGULATIONS CBC 11B-502.6.
GRAPHIC SCALE
0 SOUTH SAN
FRANCISCO
B we
MOUNTABLE MEDIAN
DEC 2022
R-8B
5'-IG
MN!
SAIGJI x
oowunu
E p
e
5 E' WI' Mn'
is
./'
hmmm
Ezwunsonl
Ja 1
GI
out al.
wnrcsnovu
T
LA
Q
lIATDi MEDIAN
2'
snncm 5:
COWUFII
D( AC
pnngn
' SAIUJT k
OUNFOBA
user m Rx
Hun PAVIUE r
\
Fl.
4*
`Efto
I .
J
I
.I
_ 1'J
of;
.~4!»-•
l.~ .u To
_ we
,l" .b'h.'00.0.0,O, la.
-0 ¢T¢oY--I|T-|- .-o- ...Q
' 'ir ;
v-- rfsrfgigwoxwét-<"r-'é*:-
1' 'a';~ go '3"3"§r' ':"
by, . 'y ..'¢ , we " ,
*
/
\l-l215! \-& AB
Z'GLR
4-14 FEMSJ
lDNGII\DINIL
2-5' CLR to comes
UNT LE EDI
-A
23 1 n
IGUNIAHE \l MAN SHALL amv B: scum urns nm own Y E ER Are U ON IIEIANS J DE mine VEIGILAR TRIFUC s :on lm 70 mm 0 (I 1m nuns AND mvnlns). llcurmlai uznwe soul. uncle E D or nc nfm ceu EC TO T
nnusou MET SQALL so put BETKEI IIUUNTAHI calm AND no sruwano nmwc 2' SIP DGIUS comm svwsr CMHRGL JGNTS .
M G
we
01*\ SAN
Q•. 4"
O
>~
f:
o"..... .
4 ¢
Q
(D
O
---o
=@».
04LIFOR` \Y*
STOP
STOP
ADA
ADA UTILITY PLAN C5.1 SHEET TITLE PROJECT TEAM: CHECKED BY DATE SHEET DRAWN BY JOB NO. 05/22/2025 30923 CONSULTANT: LANDSCAPE ARCHITECT MOORE IACOFANO GOLTSMAN, INC. CIVIL BKF ENGINEERS STRUCTURAL DAEDALUS TRAFFIC HEXAGON ELECTRICAL INTERFACE COST ESTIMATION MACK5 NEW PARK AT LINDEN AND PINE AVE 616 & 700 LINDEN AVE, SOUTH SAN FRANCISCO, 94080 www.migcom.com 800 HEARST AVENUE BERKELEY, CA 94710 TEL 510/845-7549 FAX 510/845-8750 DATE REVISION 5/21/2025 SD STAMP 1730 N. FIRST STREET SUITE 600 SAN JOSE, CA 95112 (408) 467-9100 www.bkf.com C.A. C.A/J.H. C5.1 UTILITY PLAN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
J:|:
|-
oo
I
I
I
I
I
:
i
I
I
I
I
I
-
//
I
I
l
.
........
.......
..
.......
.
K
I
I
in
nu
up En:
I
/
J
j
T l l_L__
0-
u.l
Z
<E
_I
I
Ii
of we of .Juli
LINDEN AVE
1 _
,JI
LEGEND KEYNOTE NOTES
.IIIICIIIIIIII
Q
.
s
I
\
I
I
;-5
vi." °.._.°-;
1 STORM DRAIN JUNCTION BOX W OPEN BOTTOM
M G
or!
/A
ADA
ADA STORMWATER MANAGEMENT PLAN C6.1 SHEET TITLE PROJECT TEAM: CHECKED BY DATE SHEET DRAWN BY JOB NO. 05/22/2025 30923 CONSULTANT: LANDSCAPE ARCHITECT MOORE IACOFANO GOLTSMAN, INC. CIVIL BKF ENGINEERS STRUCTURAL DAEDALUS TRAFFIC HEXAGON ELECTRICAL INTERFACE COST ESTIMATION MACK5 NEW PARK AT LINDEN AND PINE AVE 616 & 700 LINDEN AVE, SOUTH SAN FRANCISCO, 94080 www.migcom.com 800 HEARST AVENUE BERKELEY, CA 94710 TEL 510/845-7549 FAX 510/845-8750 DATE REVISION 5/21/2025 SD STAMP 1730 N. FIRST STREET SUITE 600 SAN JOSE, CA 95112 (408) 467-9100 www.bkf.com C.A. C.A/J.H. C6.1 STORMWATER MANAGEMENT PLAN H
N w we
B AIN G ma pa
opal on AI
on J* AN
MA
on N BLDG
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
N ALL w ou
N s B
emu on Al
on AN
s NA
N \DRO.DG
EJ:|:
|-
oo
F'
!
I
I
F
Iu
I
I
II
I
I
I
. -L11_1.
LEGEND
n--
A-1
11-
-3-=-
)
w
>
TCM 1
I
i
II
I
.'!'
1 LINDEN AVE
A-2
lIteL
----- -
TCM 3
.I
I
I
I
I
I
~-.
K
I
I
I
of
in
.
LI..
A-4
l
I
- -I
K--
_ lla! _ _ 4
<E
u.l
>
u.l
D.
A-5
l
5 u.l
Z
<E
_I
I
Ii
A-6
1 1
4-
M G
or!
/A
L
O
>-
:
O
of" SAN
%re 4H
E)
O
O
Q
Qt \Y*
LIFORK
FINAL CONCEPT I CONCEPTQ FINAL
NEW PARK AT LINDEN & PINE
PARQUE NUEVO EN LINDEN Y PINE
?\
FITNESS & GAMES
J
I
»
s
.
I
l
• u.l soI
o.
So
'
lr
I r
. r'
a co
•
Q
-
_
'|
6'
r
. .
ONE WAY LANE )
CALLE DE UN SOLO SENTIDO
'QI
._.
on
I
O
'u
I
I
i
U
EJERCICIO Y
JUEGOS
r
>_l`
LU
Z
o
LU
Z
-'Lu
I-<
OOL)
LLI
<f)
o
|
o
Z
D
I
' I BR
PLAY
JUEGOS
I \
.
to
r
•
¢
'1_-v 'IIIV
FLEX LAWN
PASTO FLEXIBLE
c
[f"I
[{J
\Ell9lhllinlu.llll lluL.l.l ll.»ll.;.lil llliL.Ii MJ
PLAZA
PLAZA
A2
* _ ' _
'm-Ilui1qf
I
0 I
I
I
____to . ,,_=1
:r_--_,
"1.
I
I1;
Q
_II
1 1 _ _
J
*Q -
-2
L
I .
r
l
i !
l
I »
o
1 1
\
LINDEN
AV
....II
P
. •
I I
. •
I I
\ I
-Ql-H'
FLEX LAWN
PASTO FLEXIBLE
.
9 •
P
4 l >-
< o
g I- LU Z
Z 52 o
LU
Z
<2_ID
|-IE
`l
</>
v
Ll.I
|
<
U
I--
1 BR
I
•
'l°l 1°l l°l 1.1 l'l
1[,/
/-/\/\_/\./''a ' 's -JH .
• I
I
1' I
I-I
5 J
0 ul I
_ 1
M;
.u I
`
.
2 _ 2
=--JI . » A 4
_.| E.
*_
l
hln
Feet Pie
GATHERING
REUNIONES
RECREATION & PLAY
RECREACIQN Y JUEGO
ART OPTIONS
OPCIONES DE ARTE
SITE FEATURES
CARACTERiSTlCAS DEL SITIO
PLAZA (200 People)
PLAZA (200 Personas)
LARGE EVENT OVERFLOW
ESPACIO GRANDE
PARA EVENTOS
SMALL GATHERING
(BENCHES, TABLES)
PEQUENA AREA DE REUNIQN
{BANCAS, MESAS)
u
n
E
FLEX LAWN (320 PP- LARGE LAWN)
PASTO FLEXIBLE (320 PP AREA DE
PASTO GRANDE)
FITNESS & GAMES
EJERCICIO Y JUEGOS
PLAY
JUEGOS
ART COLUMNS WITH LIGHTING
COLUMNAS DE ARTE
CON ILUMINACION
GROUND MURAL AT PLAZA
MURAL EN EL SUELO DE LA PLAZA
INTERACTIVE ART
ARTE INTERACTIVO
v
0 Q
1 -
TREE IARBOL
POWER POLE & OVERHEAD WIRES
POSTE DE LUZ Y CABLES AEREOS
EXISTING LIGHTING
ILUMINACION EXISTENTE
PROPOSED LIGHTING
ILUMINACIQN PROPUESTA
PRIVACY FENCE
CERCA DE PRIVACIDAD
PLAY AREA FENCE (4' HT)
CERCA DE AREA DE JUEGOS (4 ')
STOP SIGN
ALTO
PLANTING AREA
AREA DE PLANTAS
BR
BIKE RACKS
BICICLETERO
R
PROPOSED RESTROOM
BANO
P
PARKING
ESTACIONAMIENTO
27 PARKING EXISTING (includes lot and Pine Ave.)
17 PARKING PROPOSED
(16 standard, I ADA Van accessible)
27 ESPACIOS DE ESTACIONAMIENTO EXISTENTE
(incluye love y Pine Ave.)
17 ESPACIOS DE ESTACIONAMIENTOS PROPUESTOS
(16 esfdndar, I accesibles de ADA)
DESCRIPCIÓN DEL CONCEPTO FINAL | Nuevo parque en Linden & Pine, South San Francisco, CA En la primavera de 2024, el equipo de diseño de la ciudad de South San Francisco y MIG lanzó un proceso de diseño comunitario para imaginar y diseñar un nuevo parque en las avenidas Linden y Pine. A través de una serie de eventos públicos, se desarrolló una visión comunitaria, seguida de aportes sobre dos alternativas conceptuales. Durante este proceso, aprendimos sobre las prioridades del parque de los vecinos y las empresas locales, seguimos la orientación de los expertos técnicos y nos comunicamos con los líderes de la ciudad. ¡Estamos emocionados de compartir el plan conceptual final impulsado por la comunidad y dar los próximos pasos para hacer de este parque una realidad! DESCRIPCIÓN GENERAL DEL CONCEPTO
Inspirado en las plazas tradicionales a través del mundo que son el corazón de sus comunidades, el concepto del parque busca crear una nueva plaza contemporánea y un parque activo para Old Town de South San Francisco. El nuevo parque proporcionará espacios para reuniones grandes y pequeñas, ofrecerá recreación y juego, e incorporará características artísticas distintivas que reflejan la comunidad del parque.
ESPACIOS DE RUNION
La Plaza Central es el corazón del parque, proporcionando un espacio comunitario para reuniones medianas a grandes, como un espectáculo de música o danza, una clase de ejercicios al aire libre u otros eventos comunitarios. El espacio para multitudes puede crecer con el uso del área de pasto al lado y expandirse a un evento extragrande ocasionalmente con un cierre temporal de Linden Ave. También se proporcionan pequeños lugares de reunión por medio de bancos y mesas repartidos por todo el parque.
RECREACIÓN Y JUEGO
Un Área de Pasto Flexible al sur de la plaza tiene el tamaño adecuado para albergar una variedad de actividades: deportes informales, noches de cine, desbordamiento de la plaza, con un Área de Pasto Flexible Pequeña al norte de la plaza para picnics o actividades indirectas del área de juegos, el gimnasio o la plaza. Una pequeña Área de Fitness ofrecerá equipos de ejercicio al aire libre, y el parque ofrece espacio para Juegos en las mesas, en el pasto o la plaza. El Área de Juegos vallada está diseñada para ofrecer diversión para todas las edades dentro de un espacio compacto, e incluye los principales elementos deseados por la comunidad: estructura de escalada / resbaladilla, características de juego grupal (giratorio y columpio de la "amistad"), tobogán para niños pequeños y juegos en la naturaleza (troncos y rocas) en los bordes.
ELEMENTOS ARTÍSTICOS
En la plaza se muestran tres opciones de arte, según las preferencias de la comunidad sobre qué tipos de arte incluir. El presupuesto final de cada pieza determinará cuántos elementos se pueden incluir. Un proceso de arte público seguirá en el desarrollo del diseño para seleccionar artistas y obras de arte que reflejen la identidad y el patrimonio de la comunidad.
MÁS CARACTERÍSTICAS DEL PARQUE
Circulación: La comunidad deseaba un parque seguro y conectado con tráfico más lento, y estaban divididos sobre si hacer de Pine Ave. una calle sin salida o crear una vía conectora de un solo sentido. El concepto final incluye el carril de un solo sentido con dos señales de alto. Esto reducirá la velocidad del tráfico y proporcionará más acceso al estacionamiento, al mismo tiempo que permitirá que los vehículos de Pine Ave. viajen hasta Linden Ave.
Estacionamiento: Se proporcionan lugares de estacionamiento en el borde del parque para los usuarios del parque, los residentes locales y para apoyar a las empresas locales. A medida que avanza el desarrollo del diseño, la Ciudad revisará los tiempos de estacionamiento permitidos, el uso de parquímetros y las zonas de carga.
Seguridad: La nueva iluminación dentro del parque se basará en el alumbrado público existente a lo largo de Linden Ave. Se mantendrán líneas de visión entre las copas de los árboles y las plantaciones del suelo más bajos para garantizar la visibilidad del parque. El nuevo carril de un solo sentido que conecta Pine Ave. con 7th Lane es estrecho y tiene señales de alto para ayudar a reducir la velocidad del tráfico. Los bolardos vehiculares en la curva y los espacios de estacionamiento en la calle ofrecen una mayor separación de los usos del parque.
Baño: Un baño público (y sus costos de servicios públicos) no estaba en el presupuesto inicial del parque, pero aprendimos que era una característica importante para la comodidad de los visitantes del parque y para reducir la dependencia de los negocios adyacentes. Por lo mínimo, se proporcionará un espacio para un baño portátil, y el equipo del proyecto está explorando opciones adicionales para financiar un baño permanente para un solo usuario que se incluirá en los planos finales de construcción.
Plantación y aguas pluviales: Nuevos árboles y plantas nativas / tolerantes a la sequía con riego eficiente en el uso del agua proporcionarán sombra y proporcionarán un sentido verde y cómodo para el parque. Las aguas pluviales se dirigirán a áreas de biorretención para desacelerar y filtrar agua de lluvia.
FINAL CONCEPT DESCRIPTION | New Park at Linden & Pine, South San Francisco, CA In Spring 2024, the City of SSF and MIG design team launched a community design process to envision and design a new park at Linden and Pine Avenues. Through a series of public events, a community vision was developed, followed by input on two concept alternatives. During this process, we learned about park priorities from neighbors and local businesses, followed the guidance of technical experts, and checked in with city leaders. We are excited to share the final community-driven concept plan and take the next steps to make this park a reality!
CONCEPT OVERVIEW
Inspired by traditional plazas around the world that are the heart of their communities, the park concept seeks to create a contemporary new plaza and active park for the Old Town Neighborhood of South San Francisco. The new park will provide spaces for large and small gatherings, offer recreation and play, and incorporate distinct art features reflective of the park’s community.
GATHERING
The Central Plaza is the heart of the park, providing a community space for Medium-to-Large Gathering, such as a music or dance performance, outdoor exercise class, or other community events. Crowd space can grow with the use of the adjacent lawns and expand to an extra-large event occasionally with a temporary closure of Linden Ave. Small Gathering spots are also provided at benches and tables spread throughout the park.
RECREATION & PLAY
A Large Flex Lawn south of the plaza is sized to host a variety of activities—casual sports play, movie nights, plaza overflow—with a Small Flex Lawn north of the plaza for picnics or spillover activity from the play area, fitness, or plaza. A small Fitness Area will offer outdoor exercise equipment, and the park provides space for Games at the tables, lawn, or plaza. The fenced Play Area is designed to offer fun for all ages within a compact footprint, and includes the top elements desired by the community—climbing/sliding structure, group play features (spinner and facing “friendship” swing), tot slide and nature play (logs & boulders) at the edges.
ART ELEMENTS
Three art options are shown at the plaza, based on the community’s preferences for which types of art to include.
The final budget for each piece will determine how many elements can be included. A public art process will follow in design development to select artists and artwork reflective of the community’s identity and heritage.
MORE PARK FEATURES
Circulation: The community desired a safe, connected park with slower traffic, and were split on whether to make Pine Ave. a dead-end street or create a one-way connector. The final concept includes the one-way lane with two stop signs. This will slow down traffic and provide more parking access, while also allowing Pine Ave. vehicles to travel through to Linden Ave.
Parking: Parking spots are provided at the edge of the park for park users, local residents and to support local businesses. As design development moves forward, the City will be reviewing allowable parking times, use of meters, and loading zones.
Safety: New lighting within the park will build upon the existing street lighting along Linden Ave. Sight lines will be maintained between tree canopies and lower ground plane plantings to ensure visibility into the park. The new oneway lane connecting Pine Ave. to 7th Lane is narrow with stop signs to help slow traffic. Vehicular bollards at the curve and street parking spaces offer further separation from park uses.
Restroom: A public restroom (and its utility costs) was not in the initial park budget, but we learned it was an important feature for park visitors’ comfort and to reduce reliance on adjacent businesses. Space for a porta potty will be provided at a minimum, and the project team is exploring additional options for funding a permanent singleuser restroom to be included in the final construction drawings.
Planting & Stormwater: New trees and drought-tolerant/native plants with water-efficient irrigation will provide shade and offer a comfortable, green backdrop for the park. Stormwater will be directed to bioretention areas to slow and filter runoff.
1 YOUR VISION FOR THE PARK I ru V/5/@N PARA EL PARQUE NEW PARK AT LINDEN & PINE
PARQUE NUEVO EN LINDEN Y PINE
GATHERING I REUNIONES
Large Gathering Spaces
in " Ullllllll
ma.- .t$a».. ..
I Grandes Espacios de Reunion
/'**.
ii
Centrol plezo & overflow space on Linden Ave.
Plaza central y espocio edicional en Linden Ave.
Small Gathering Spaces
.
1 in
Colorful benches & tables
Boncas y mesas de colures
| Pequerios Espocios de Reunion
llllll
lllll
llll 1
,F
RECREATION & PLAY I RECREACIC§N Y JUEGO
Flex Lawn | Area de Pesto Flexible Fitness Station/Game Space I Estacién de Fitness/Espacio de Juegos Climbing/sliding structure customized to space
Es frucfura Trepanfe/resbcllodilla adapfadc: of espacio Group Spinner
Girodor Grupol
Group Swing
Columpio Grupol
Tot Slide
Resbolodillo pert pequehos
Noture Ploy Edges
Orillas de juego en nafuralezo
SITE FEATURES I ELE/\/IENTOS DEL SITIO
@ Proposed Restroom I
H --
o
)
o-..'
I
E
Bohn Propuesto m Bike Racks | Porfobiciclefas
II
-:..-I
I
'Fr~
II
I Trees & Planting | Areoles y Plonfas
www.ssf.net/parkprojects
STAY INFORMED
ON DESIGN &
CONSTRUCTION
PROGRESS
SCAN THE QR CODE
MANTÉNGASE
INFORMADO SOBRE
EL PROGRESO
DEL DISEÑO Y LA
CONSTRUCCIÓN
ESCANEE EL CÓDIGO
QR A CONTINUACIÓN
In reviewing the two plan
ART FEATURES I ELEMENTOS DE ARTE
alternatives at our last events,
the community preferred:
AI reviser los dos olfemafivos del
plan en nuesfros Ultimos evenfos, Io
comunidad prefirié lo siguienfe:
Colorful Ground Mural At Plaza
Festival Light Columns
Arl/play - Climbing Sculpture
Colorful Sealwalls
Arl'lul Performance Backdrop
Fence Mural
Vertical Entry Sculpture
Memorial Arl
0 499
lllllllllllllllll
llllllllllllllll
lllllllllllll
lllllllllll
39I
378
352
330
32 I
300 400
liokzl Weighted Score
Punfuaelén total
100 200
485
473
500
The above input, along with the
plan updates, resulted in three
POTENTIAL ART OPTIONS:
Los oporfes anferiores, junco con
los octuolizociones del plan,
dieron Como resulfado ties
OPCIONES DE ARTE POTENCIALES:
Art Columns with Lighting | Column's de Arie con Iluminocién NDE JE v 1
PARQUE NUEVO EN LINDEN Y PINE I CRONOGRAMA DEL PROYECTO . .l H ' A 1 .
CUIDAD DE SUR SAN FRANCISCO
Q.H SA y c
** *
3 >
:
U
ino\'1*\*
I
I
I
2024 2025 2026
APR MAY JUN JUL AUG SEPT OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEPT OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEPT OCT NOV _-
I-CREATE THE VISION
CREAR LA VISION
DESIGN ALTERNATIVES _
ALTERNATIVAS DE DISENO
ADVISE ON ALTERNATIVES
ASESORAR ALTERNATIVAS
CONCEPT DEVELOPMENT
DESARROLLO DEL CONCEPTO
REFINE FINAL CONCEPT
REFINAR EL CONCEPTO FINAL To* APPROVALS THROUGH DESIGN DEVELOPMENT T APROBACIONES DisENo
CONSTRUCTION DOCUMENTS
AND BIDDING ,
DOCUMENTOS DE CONSTRUCCION
Y LICITACIONFS
nsmuccré».
SCAN HERE FOR MORE INFORMATION
;ESCANEA AQUI PARA OBTENER MAS INFORMACION!
LEGEND: C mm ityF dba k ICome to' C m ifa 'os
WorkP iod I Pe' d D Tabojo
llllllllllll
Ground MuraII Mural de Sue lo
Interactive Arll Arne Inferacfivo
I
'it
III in
l I
cm
n
• •
•
om
, '
• •
jP' 4iiiil
��XAGON T�ANSPO�TATION (ONSULTANTS, IN<.
Memorandum
Date: March 10, 2025
To:
From:
Mr. Philip Vitale, Jr., City of South San Francisco
Gary Black, Tim Chang
Subject: Site Plan Review for Linden Park in South San Francisco, California Hexagon Transportation Consultants, Inc. has completed a site plan review for the proposed Linden Park in South San Francisco, California. The project site is located on the east side of Linden Avenue, between 8
th Lane to the north and 7
th Lane to the south. The site is comprised of two
parcels (616 Linden Avenue and 700 Linden Avenue) and a section of Pine Avenue that bisects the project site. 616 Linden Avenue is currently an active parking lot and 700 Linden Avenue is a vacant grass lot. The two parcels are proposed to be redeveloped into a park with a children's play area, a space for recreation, a sports court, spaces for community gathering and public art.
Hexagon reviewed the proposed Linden Park site plan and provided the following recommendations for design elements. The site plan with markup is shown in Appendix A.
1. Relocate the stop bar and stop sign at the park entrance from Pine Avenue to the start of the curve for improved driver visibility and expectancy to stop in advance of the crosswalk.
2. Install W1-6(L) (arrow) sign along the outside of the curve at Pine Avenue.
3. Install W11-2 (ped crossing) and W16-7P ( diagonal arrow) signs on both sides of the crosswalk adjacent to Pine Avenue.
4. Recommend modifying the curb for channeling the right turn and implication that right turn is the only allowed movement at 7
th Lane.
5. Move stop sign closer to stop line at the 7
th Lane/One Way Lane intersection.
6. Install R3-5(R) "right-turn only" sign in addition to stop sign at the 7 th Lane/One Way Lane
intersection.
7. Install "do not enter'' signs at the northeast corner of the 7 th Lane/One Way Lane intersection
to prevent vehicles from entering from 7
th Lane.
8. Install R3-1 "no right-turn" sign for westbound 7
th Lane traffic.
9. Placement of any landscaping at the northwest corner of the 7 th Lane/One Way Lane
intersection should be checked to ensure sight line for cars backing out from angled parking are not blocked.
10. Placement of any landscaping at the southeast corner of the Linden Avenue/8th Lane intersection should be checked to ensure sight line for cars backing out from angled parking are not blocked.
100 Century Center Court, Suite 501 • San Jose, California 95112 • phone 408.971.6100 • fax 408.971.6102 • www.hextrans.com Appendix A
Site Plan Recommandations
...
>
<
NEW PARK AT LINDEN & PINE FINAL CONCEPT I CONCEPTO FINAL PARQUE NUEVO EN LINDEN Y PINE Install R3-1 "no right-tum"
sign for 7th lane traffic
Install W11-2 (ped
crossing) and W16-7P
(diagonal arrow) signs on
both sides of crosswalk Relocate stop bar and ONE WAY LANE ---+ stop sign to here for improved driver CALLE DE UN SOLO SENT/DO
visibility and
expectancy to stop in
advance of the
crosswalk
• a) Recommend to modify curb for
channeling the right turn and
- -+----~implication of right turn is the only
allowed movement.
Placement of any landscaping Placement of any landscaping ' within this area should be within this area should be checked to ensure sight line for checked to ensure sight line for cars backing out from angled cars backing out from angled parking not be blocked. parking not be blocked.
GATHERING RECREATION & PLAY ART OPTIONS SITE FEATURES
REUNIONES RECREACION Y JUEGO OPCIONES DE ARTE CARACTERiSTICAS DEL SIT/0 PLANTING AREA PLAZA (200 People) F7 AREA DE PLANTAS FLEX LAWN (320PP- LARGE LAWN) TREE IARBOL PLAZA (200 Personos) L_j PASTO FLEXIBLE (320 PP AREA DE Al ~~l~~~~Ni/~l~~/lGHTING PASTO GRANDE} CON ILUMINAC/6N POWER POLE & OVERHEAD WIRES BR ::~~;l~ E~~ POSTE DE LUZ Y CABLES AEREOS ~ PR ~POSEO RESTROOM
LARGE EVENT OVERFLOW ~ BANO □ EXISTING LIGHTING FITNESS & GAMES /LUM/NACION EXISTENTE ESPACIO GRANDE EJERC/C/0 Y JUEGOS " PARA EVENTOS PROPOSED LIGHTING r;-"7 PARK ING L..:..J ESTACIONAMIENTO ILUM!NACl6N PROPUESTA SMALL GATHERING -PRIVACY FENCE 27 PARKING EXISTING (Includes lot and Pine Ave.) PLAY (8ENCHES , TA8lES) JUEGOS CERCA OE PR/VACIDAD 17 PARKING PROPOSED PEOUENA AREA DE REUNION (16 standard, 1 ADA Van accessible) (BANCA$, MESAS) PLAY AREA FENCE (4' HT)
• 27 ESPACIOS DE ESTACIONAMIENTO EX!STENTE
(incluye lofe y Pine Ave.} STOP SIG N
CERCA DE AREA DE JUEGOS (4'}
17 ESPACIOS DE ESTACIONAM /ENTOS PROPUESTOS ALTO / 16 esl6ndor, 1 occesibles de ADA} BKF ENGINEERS 1730 N. FIRST STREET SUITE 600 SAN JOSE, CA 95112 (408) 467-9100 www.bkf.com A-2
Below Grade
Bioretention Planter
A-3
Bioretention Area
A-1
Bioretention Area
A-3 A-2 A-1 3/12/25 CIVIL ALTERNATIVE A - BIO STORMWATER ALTERNATIVES 1 OF 3
CDBKF Engineers
o
m
|-
m
I
X
LIJ
acD.
up
;
'U
I
LIJ
>
<
z
LIJ Q
z
_|/
(D
z
O
|-D. O
ac
LIJ
|-
<
§
acO
|-
m
I
1'
O
/
in
-H
.a
.c
X
LIJ
/
_|
I
o
z
LIJ
/
x
L
U
1, o
o
GJ _
: o
c N
G) c
> U
"i o
c
GJ of
'o >-
c m
_Io
lu.:
L|.|-
cm-
(DO
l_l
<1-a
If)
ID
1-
n
N
/no
nm
5.-
1-
xo
LIJ
2 <»»
ZLIJ
|-
c.'><
zo
;»-
<O
n:_1
QD.
>
1 I
.\
I
l
I
I
l
I
I
I
I
11.1.1 |-
m
_I I
LIJ
IJJg
E
D->
<
:|:
Lu
'*'< >
I l_l_l-L ;
I
I
U)
!
a
I
1 :
1 1
I
1 ;
.
1 (D 1 1
3 TWO STORY. 1
i
n I I
.l. 1. _l l_l go .l. Ll. - -of.._ ,.
Q
-
I
.
:|:
6 I I
.
l I I
-\
T'
Lu
I" l-l
GRASS
£
I •
. I
=n.
.1
ocncnrlt
DRIVEWAY I
I »
A \
J I I I
\p \ GRA )
O
"o
"\6
\
0,9 .\0
/Y I
;
I
I
l
Q
5 0
Q
.
-41
c.'>
(D I a AC V
Llllll
_
_
l
_ "llllll" I
M
I
, •
\@ P
1 E
I
I
EJERCICIO Y
JUEGOS I
I
I
I
I
I
:|:
O
:|:
CALLE DE UN SOLO SENTIDO
: I :
I I I
on
(D
•
I I
FITNESS & GAME? I
Ill
l
I
\
/(
// \
/ \
/
/
,K
/ \
/
/
/
/
OONCRETE
DRIVEWAY
I
I i'
@ /
CP I • . 1 a •
I .
I;
GR»§b
,K
/
/
/
/
/
(D
<n
/ `
(1
'1 I 1 I l I I I
/.
/ I I I I
It I
l
l
l
l
\\ I
Iii H
I
I
in
,
/
/
/
/
/
/
/
/
JUEG /
(D
O
N A
/.
/
/ l
/
/
/
I I I
II
w I I I
>a \
I I ;
x
w
I (D
'I \
\
\
\
\
/
,
/ \
\
/
/ I
r
AC
E o
o
FLEX LAWN E5 PLAZA DRIVEWAY I I I
I
/
/
/
/
I /
I
\ I
I FLEXIBL Pl AZA I I I /
/ r q
I I
I I
I I;I
u I *r
,,
. We X t ,* 4
/.
/
/
/
/
/
/
I
<.
., if
U)
(D
/
/
/
/
/
/
/
/
/
/
/ /f
E5 I A3 /
l
l
I
l
l
l
l
l
_
l
l
l
l
I
I
l
l
l
l
l
l
l
C _i I I
(D
c: | . I • H
LANDSCAPING
I RR
©
BR l FE
l QL'
COMM COMM amu mum COMM COMM FE cow COMM UI G
COMM
G
COMM COMM
G G G G / 'r vnu G r 7'vs
\ I bit
mum mum GM. SL-MMM MUM
.
b..
42" eormns cunt
G
r' ooncnm
V 1 4' amen
I /
G G G G
LANTER as' cancans ¢unm\
\FACE OF CURB
G G G
q
42" coucnm cum
FAR OF was
UP OF amen
G-l G
36I CONCRETE amen
UP OF ounEeD
r
--__l1l-n_ /'
;
~l nr :
11]T ww
O AC
/
$11
V" UNI:N AVENUE
/
(D O
1 wl
LOWER
v w
»<
-hi . t
cow comm
G
;D
1R"Qn . \
SD SD SD SD
\
C
D
-r
• I w w w w w
wi
-w w w w w w
42' concnnz GJTIER
w -w "1 / II 36" ooncnm cunt 38" ocucasrz ounce
6%
u »°:<
\*r
+
. #49
S I l_ ll 9.9; Q as 's /A
w I
42" concRE1t amen
SS SS SS
?
ss SS SS SS S
SS so. VCP s S A
l
•
L
G
2 CD
3 O
;
(D
I I H
u |
u !
I
O
I
O
4--
GRAPHIC SCALE
H H
30 o 30 60
m
S
z
0:
O
!-1
_|
<
o
C
z
3 O
o
O
H
<
2 z
<
(D
¥
E
<
D.
l.u
D
z
l.u
>
<
z
l.u
D
z
_|
O
o
Qo
z
<
0:
LL
z
<
(D
E
3 O
(D
2 6
z
§
§
'2
3 E
Ii
§
g
2 s
5 3
Shoot Number'
J.
FLEX LAWN AC
AC
PASTO FLEXIBLE
l
l
11 I--
10 _
l__
10 _
BKF ENGINEERS 1730 N. FIRST STREET SUITE 600 SAN JOSE, CA 95112 (408) 467-9100 www.bkf.com B-2
Below Grade
Silva Cells
B-3
Below Grade
Silva Cells
B-1
Below Grade Silva Cells
B-3 B-1 B-2 CIVIL ALTERNATIVE B - SILVA STORMWATER ALTERNATIVES 3/12/25 2 OF 3 CDBKF Engineers
m
;
o
J
>
_|
(0
|-
m
I
X
LIJ
acD.
LIJ
>
<
z
LIJ
Q
z
/
_|
(D
z
O
|-D. O
ac
LIJ
|-
<
§
ac
O
|-
m
I
1'
O/
in
-H
.a
.c
X
LIJ
/
_|
I
o
z
LIJ /
x
L
U
1, o
o
GJ _
: o
c N
G) c
> U
"i o
c
GJ of
'o >-
c m
_Iolu.: L|.|-
cm- (DOl_l <1-a If) ID
1-
n
N
/no
nm
5.-
1-
xo
LIJ
2 <»»
ZLIJ|- c.'><
zo
;»-
<On:_1 QD.
\
>
1 I
.\
J
I
I
l
I
l
I
I
I
I
11.1.1 |-
m
_I
LIJ
IJJg
E
D->
< I
I
;
I
I
:|:
Lu
'*'< >
l_l_l-L
U)
(D
I
1 :
1 1
I
1 2.
|
1 o
g
;
N
3 TWO STORY swoon BUILDING
99§°..!?§J5 MUM \
\
II _ 1
I
I I
I
or 'a I
. .
l
l I §\
-\
I, . -n
if Jr
GRASS
£
I •
I
ET
I
O !|
L
ocncnrlt
DRIVEWAY I
.
,f »
\ J
I
. •
GRA
Et 0,9
0/Y
"
I
\ 125
I (D I
CALLE DE UN SOLO S TIDO
V
I
4\0 _Ulu
` \
lllll
"o
I I
I
, •
\@ E
I
EJERCICIO Y
JUEGOS
*
I u
\p
/V
JJ
'|
\
© -. `u Q
I I T
I
\
/(
// \
/ \
/
/
,K
/ \
/
/
/
/
OONCRETE
DRIVEWAY
I
I i'
(D _
A-ee VI
I •
. I; GR»§b
,K
/
/
/
/
/
(D
A \l <n
FITNESS & GAME
. \' H' I °1 I I [~ I I
u" I
H
I
I
_
_
l
_
_
l
_
ll.
_
l
I l
1 I
/.
/
/
/
/
/
/
,
/
/
/
/
O /
°l
I I I
I I
w ;
I I (D
I
AC
E o
o E5 PLAZA DRIVEWAY I
! 1°I
I I
I
I I (D Pl AZA
/'
/
/
/
/
/
/ /'
/
/
/
/
/
/ I I I /
I
I
FLEX LAWN
FLEXIBLI I
I;I
/.
/
/
/
/
/
_
H
We
.w"g"1
u
l
Z
I
I
/
/
,K
/ \
/
/
/
/
/
/
/
/
/
/
/ /f E5
LANDSCAPING I
c: H
X
I bit
l
l
I I
_
:
l
' -4I
QL'
FE
_BR »
cow cow of
COMM COMM COMM
I | | Iml
l on I nr | A3 I
. , I \\ I
_ B-E-l . I •
I . 1 If
°°'é" COMM COMM COMM OOMM COMMa
G G
/
G G r G
7'vs
\ I
1-1.1-
COMM COMM cow-Js COMM COMM
V 1 /
G G G G
LANTER as' cancans ¢unm\
\FACE OF CURB
G G G G
q
42" coucnm cum
FAR OF was
UP OF amen
G-l G G
. b.. r' ooncnm
36 CONCRETE amen 4 amen
UP OF GUTTFBD
--__l1l-n_ /'
;
couu--cow
GO
wU)
O AC
/
$11
I
V" UNI:N AVENUE
1 wl
LOWER
v w
» <
Lie--"mm
G 'r vnu
42" eormns cunt
lIJ
lIJ
(D ~Z\ O
1R"Qn . \
SD SD SD SD
\
C
n ;D
-r
•
w w w w w
wi
-w w w w w
42' concnnz GJTIER
w w
I -w "1 / II 36" ooncnm cunt 38" ocucasrz ounce
6%
u »°:<
\*r . #49
S _ l_ II
ss
? 9.9; as 's /A S
w I
42" concRE1t amen
SS SS SS SS SS SS
SS so. VCP s S A
l
•
L
G
2 I
CD
3 O
;
(D
u |u u
H
I
O
I
O
I 4--
GRAPHIC SCALE
H H
30 o 30 60
m
S
z
0:
O
!-1
_|
<
o
C
z
3 O
o
O
H
<
2 z
<
(D
¥
E
{
D.
l.u
D
z
l.u
>
<
z
l.u
D
z
_|
O
o
Qo
z
<
0:
LL
z
<
(D
E
3 O
(D
2 6
z
§
§
'2
3 E
Ii
§
g
2 s
5 3
Shoot Number'
L
FLEX LAWN AC
AC
PASTO FLEXIBLE
_
-.
10 l
-l__.
-.
l
BKF ENGINEERS 1730 N. FIRST STREET SUITE 600 SAN JOSE, CA 95112 (408) 467-9100 www.bkf.com A-2
Below Grade
Bioretention Planter
B-3
Below Grade
Silva Cells
B-1
Below Grade Silva Cells
A-2 B-3 B-1 CIVIL ALTERNATIVE C - COMBINED STORMWATER ALTERNATIVES 3/12/25 3 OF 3 CDBKF Engineers
m
;
'o
I
Q
LIJ
z
go
|-
m
I
X
LIJ
acD.
LIJ
>
<
z
LIJ Q
z
/
_|
(D
z
O
|-D. O
ac
LIJ
|-
<
§
acO
|-
m
I
1'
O
/
in
-H
.a
.c
X
LIJ
/
_|
I
o
z
LIJ
/
x
L
U
1, o
o
GJ _
: o
c N
G) c
> U
"i o
c
GJ of
'o >-
c m
_Iolu.: L|.|-
cm- (DOl_l <1-a If) ID
1-
n
N
/no
nm
5.-
1-
xo
LIJ
2 <»»
ZLIJ
|-
c.'><
zo
;»-
<O
n:_1
QD.
\
>
1 I
.\
J
I
I
l
I
l
I
I 4
I I
I
11.1.1 |-
m
_I I
I
LIJ
IJJg
E
D->
< I
;
:|:
Lu
'*'< >
l_l_l-L
U)
I
I
I
!
a
I
1 :
1 1
I
1 ;
.
1 (D
IIIII? 3 TWO STORY swoon BUILDING
99§°..!?§J5
I 411
us
. __o: I . .
o
g
;
N
E5
*V 11 !
O I
l
l I
-\
t
*H
g, . _ 1 _ _ Q - _ -_ Q -| _ ._ - -| -n
"1 GRASS
y
Ll" £
ocncnrlt I •
I 1 DRIVEWAY I
. '
»
\ h C 1
~\
\
J I
I
I
. •
GRA
O
"o
0,9
\o/Y I
L
!
l
0 5
Q
4 n FITNESS & GAME
c.'>
(D I
AC
\ Izzy \ I
V
"llllll" I I
I
I
I
1 -L \@ ;
•
,
E P
I
EJERCICIO Y
JUEGOS
\p
/V
l&,T
l"'»l
\
I
I
I I
© I I
CALLE DE UN SOLO SENTIDO
I : I
I I I
I I I I
Llllll
0 _
_
l
_
_
l
_
\
,K
// \
/ \
/
,K
// \
/
/
/
/
l
_
l
I
l
OONCRETE
DRIVEWAY
1 r
I
_
A-ee V]
• I •
. i
GR»§b
,K
/
/
/
/
/
(D
A <n \l °1
to_-___-_ *___ __
I I [~ I I
u" I
lL
l
I l
I
I
\
\
\
\
\ I
/.
/
/
/
/
/
/
,
/
/
/
/
(D
O I I
I I
\ w 3 I I (D E E5
Q.j~\PLAZA I
o
o
AC
DRIVEWAY
• I
4 I
)'
.Nvr
A
`§\
I @- I
I I Pl AZA u
III
u I
/'
/
/
/
/
/ /'
/
/
/
/
/
/ I I / /.
I
I
FLEX LAWN
FLEXIBLI I
/ \
/
,,<' fS§§I
/ .
/
/
/
/
/
/
/
/
/
I ;
r
n
<w
H
We X .w"g"1
/
/
/
/
I /
/f I
nr I E5 A3
.
I H
LANDSCAPING
I m bit N A
l
lo
I
.l___
-.
_
_
l
_
l
I
I
l
FE
_BR »
COMM COMM amu mum cow cow COMM COMM
G
COMM COMM
G G G
/ 'r vnu G r 7'vs
\ n
mum MUM MMMJS MUM MUM
Q
coup Locum
b.. .
G
42" eormns cunt
G
r' ooncnm
V 1 4' amen
I /
G G G G
LANTER as' cancans ¢unm\
\FACE OF CURB
G G G G
q
42" coucnm cum
FAR OF was
UP OF amen
G-l G
36I CONCRETE amen
UP OF ounEeD
--__l1l-n_ /'
;
Jo l
couu--cow
65 G
wU)
O AC
/
$11
V" UNI:N AVENUE
1 wl
LOWER
v w
15-<=°-
l|J
lIJ SD SD
(D ~Z\ O
1R"Qn . \
SD SD
\
C
n ;D
-r
•
w w w w w
wi
-w w w w w
42' concnnz GJTIER
w w
I -w "1 / II 36" ooncnm cunt 38" ocucasrz ounce
6%
u »°:<
\*r . #49
S I l_ ll
ss
9.9; Q as 's /A SS
w I
42" concRE1t amen
SS SS
?
SS SS SS S
SS so. VCP s S A
l
•
L
G
2 I H
CD
3 O
;
(D
u |
u ! I
I
O
I
O
4--
GRAPHIC SCALE
H H
30 o 30 60
m
S
z
0:
O
!-1
_|
<
o
C
z
3 O
o
z
<
(D
O
H
<
2 ¥
M
<
D.
l.u
D
z
l.u
>
<
z
l.u
D
z
_|
O
o
Qo
z
<
0:
LL
z
<
(D
E
3 O
(D
2 6
z
§
§
'2
3 E
Ii
§
g
2 s
5 3
Shoot Number'
FLEX LAWN AC
AC
PASTO FLEXIBLE
APPENDIX B
Environmental Site Assessments
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
B1. Final Phase 1/Phase II Environmental Site Assessment (Toeroek Associates, Inc. 2021)
New Park at Linden and Pine Project
Initial Study/Mitigated Negative Declaration
July 2, 2021
Dr. Kelly Garbach
EPA TBA Project Manager
U.S. Environmental Protection Agency, Region 9
75 Hawthorne Street
San Francisco, CA 94105
Subject: Final Phase I/Phase II Environmental Site Assessment Targeted Brownfields Assessment Report
South San Francisco - Linden & Cypress Aves, South San Francisco, CA U.S. EPA Region 9, Resource Conservation and Recovery Act (RCRA) Enforcement, Permitting, and Assistance (REPA) Contract No. 68HERH19D0018, Task Order No. 68HE0920F0007
Dear Dr. Garbach:
Toeroek Associates, Inc. (Toeroek) and Tetra Tech, Inc. (Tetra Tech) (hereafter “Toeroek Team”) submit the attached Final Phase I/Phase II Environmental Site Assessment (ESA) Targeted Brownfields Assessment (TBA) Report regarding a TBA at the South San Francisco - Linden & Cypress Aves site.
This deliverable has been reviewed internally as part of Tetra Tech’s quality assurance program, as well as Toeroek’s quality assurance program, and is consistent with Toeroek’s Quality Management Plan for the REPA contract. Documentation of this review is retained in the Toeroek Team’s project files.
If you have any questions or comments, please contact Greg Hanna at (720) 898-4102 or Dayna Aragon at (510) 302-6242.
Sincerely,
Greg Hanna Dayna Aragon
Toeroek Team Program Manager Toeroek Team Project Manager Enclosure: Final Phase I/Phase II ESA TBA Report
cc: Lisa Hanusiak, EPA Region 9 TOCOR
Jinky Callado, EPA Region 9 Alternate TOCOR
Toeroek Team files
PHASE I/PHASE II ENVIRONMENTAL SITE ASSESSMENT
TARGETED BROWNFIELDS ASSESSMENT REPORT
SOUTH SAN FRANCISCO - LINDEN & CYPRESS AVES
SOUTH SAN FRANCISCO, CALIFORNIA
TARGETED BROWNFIELDS ASSESSMENT (TBA)
RESOURCE CONSERVATION AND RECOVERY ACT (RCRA)
ENFORCEMENT, PERMITTING, AND ASSISTANCE (REPA)
CONTRACT
CONTRACT NO. 68HERH19D0018; TASK ORDER NO. 68HE0920F0007 Prepared for:
EPA REGION 9
TBA SUPPORT PROGRAM
75 HAWTHORNE STREET
SAN FRANCISCO, CALIFORNIA 94105
July 2, 2021
Final
Prepared by:
Toeroek Associates, Inc.
300 Union Blvd., Suite 520
Lakewood, Colorado 80228
303-420-7735
and
Tetra Tech, Inc.
1999 Harrison Street, Suite 500
Oakland, California 94612
510-302-6300
i
PHASE I/PHASE II ENVIRONMENTAL SITE ASSESSMENT
TARGETED BROWNFIELDS ASSESSMENT REPORT
SOUTH SAN FRANCISCO - LINDEN & CYPRESS AVES
SOUTH SAN FRANCISCO, CALIFORNIA
CONTRACT NO. 68HERH19D0018;
TASK ORDER NO. 68HE0920F0007
APPROVAL PAGE
Prepared by:
Dayna Aragon, Project Manager
Tetra Tech, Inc.
Date: 7/2/2021
Reviewed by:
Sarah Cook, Quality Assurance Manager
Toeroek Associates, Inc.
Date: 7/2/2021
Approved by:
Lisa Hanusiak, Contracting Officer’s Representative
U. S. Environmental Protection Agency, Region 9
Date:
Hanusiak, Lisa Digitally signed by Hanusiak, Lisa
Date: 2021.07.06 07:36:07 -07'00'
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
ii
TABLE OF CONTENTS
APPROVAL PAGE...........................................................................................................................................i TABLE OF CONTENTS ...............................................................................................................................ii ACRONYMS AND ABBREVIATIONS....................................................................................................vi EXECUTIVE SUMMARY ...................................................................................................................... ES-1
1.0 INTRODUCTION .............................................................................................................................1 PURPOSE ............................................................................................................................................. 1 SCOPE OF WORK............................................................................................................................. 2 SPECIAL TERMS AND CONDITIONS ...................................................................................... 2 PERSONNEL PERFORMING TBA.............................................................................................. 3 LIMITATIONS AND EXCEPTIONS OF ASSESSMENT....................................................... 3
2.0 PROJECT AREA DESCRIPTION .................................................................................................4
3.0 SITE CONDITIONS .........................................................................................................................5 HISTORICAL BACKGROUND AND PREVIOUS INVESTIGATIONS........................... 5 PHYSICAL SETTING ....................................................................................................................... 7
3.2.1 Geologic Setting..................................................................................................................... 8
3.2.2 Hydrogeology ......................................................................................................................... 9
4.0 PHASE I/PHASE II ENVIRONMENTAL SITE ASSESSMENT ACTIVITIES ..............10 GEOPHYSICAL EVALUATION.................................................................................................10 ANOMALY INVESTIGATION....................................................................................................11 SOIL GAS SAMPLING ...................................................................................................................12
4.3.1 616 Linden ............................................................................................................................13
4.3.2 905 Linden ............................................................................................................................13 GROUNDWATER SAMPLING ...................................................................................................14 SOIL SAMPLING .............................................................................................................................15
4.5.1 616 Linden ............................................................................................................................15
4.5.2 700 Linden ............................................................................................................................16
4.5.3 905 Linden ............................................................................................................................16
4.5.4 705 Cypress...........................................................................................................................17 QUALITY CONTROL SAMPLES................................................................................................17 DEVIATIONS FROM THE SAP/QAPP ADDENDUM .......................................................17 Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
iii
5.0 PHASE I/PHASE II ASSESSMENT RESULTS........................................................................20 SOIL GAS SAMPLING RESULTS ...............................................................................................20
5.1.1 VOCs .....................................................................................................................................20
5.1.2 Additional Analytes .............................................................................................................21 GROUNDWATER SAMPLING RESULTS...............................................................................21
5.2.1 VOCs .....................................................................................................................................22
5.2.2 TPH........................................................................................................................................22 SOIL SAMPLING RESULTS .........................................................................................................22
5.3.1 VOCs .....................................................................................................................................23
5.3.2 PAHs......................................................................................................................................23
5.3.3 Metals.....................................................................................................................................23
5.3.4 Leachable Chromium and Lead.........................................................................................25
5.3.5 TPH........................................................................................................................................26
5.3.6 Pesticides...............................................................................................................................26 QUALITY CONTROL SAMPLING RESULTS ........................................................................27
6.0 VAPOR ENCROACHMENT SCREENING.............................................................................28 TIER 1 SEARCH DISTANCE TEST ...........................................................................................28 TIER 1 CHEMICAL OF CONCERN TEST...............................................................................29 TIER 1 CRITICAL DISTANCE TEST ........................................................................................30 TIER 2 EVALUATION OF SOIL-GAS DATA TEST.............................................................30 VAPOR ENCROACHMENT CONDITION SCREENING CONCLUSIONS ................30
7.0 EXCEPTIONS, DELETIONS, AND DATA GAPS ................................................................31
8.0 CONCLUSIONS, OPINIONS, AND RECOMMENDATIONS...........................................32 FINDINGS AND CONCLUSIONS.............................................................................................32 CONCEPTUAL SITE MODEL.....................................................................................................36 RECOMMENDATIONS.................................................................................................................37 ENVIRONMENTAL PROFESSIONAL STATEMENT ........................................................38
9.0 DISCLAIMERS .................................................................................................................................39
10.0 QUALIFICATIONS.........................................................................................................................40
11.0 REFERENCES..................................................................................................................................41 Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
iv
LIST OF FIGURES
Figure 1: Site Locations
Figure 2: Current Site Features - 616 Linden Avenue
Figure 3: Current Site Features - 700 Linden Avenue
Figure 4: Current Site Features - 905 Linden Avenue
Figure 5: Current and Historical Site Features - 705 Cypress Avenue Figure 6: Sample Locations - 616 Linden Avenue
Figure 7: Sample Locations - 700 Linden Avenue
Figure 8: Sample Locations - 905 Linden Avenue
Figure 9: Sample Locations - 705 Cypress Avenue
Figure 10: Sampling Results Exceeding Screening Levels - 616 Linden Avenue Figure 11: Sampling Results Exceeding Screening Levels - 905 Linden Avenue Figure 12: Conceptual Site Model - 616 Linden Avenue
Figure 13: Conceptual Site Model - 905 Linden Avenue
LIST OF TABLES
Table 1: Sample Summary
Table 2: Summary of Analytical Data - Soil Gas - VOCs
Table 3: Summary of Analytical Data - Soil Gas - Additional Analytes Table 4: Summary of Analytical Data - Groundwater - VOCs Table 5: Summary of Analytical Data - Groundwater - TPH Table 6: Summary of Analytical Data - Soil - VOCs
Table 7: Summary of Analytical Data - Soil - PAHs
Table 8: Summary of Analytical Data - Soil - Metals
Table 9: Waste Characterization - Soil - Metals
Table 10: Waste Characterization - Leachate - Metals
Table 11: Summary of Analytical Data - Soil - TPH
Table 12: Summary of Analytical Data - Soil - Pesticides Table 13: Soil Gas VOC Exceedances Summary at 616 Linden Table 14: Groundwater TPH Exceedances Summary at 905 Linden Table 15: Soil TPH Exceedances Summary at 616 Linden and 905 Linden Table 16: Summary of Approximate Minimum Search Distances Table 17: Summary of Analyses and Findings
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
v
LIST OF APPENDICES
Appendix A: Phase I Environmental Site Assessment Report Appendix B: Photographic Documentation Log of Field Activities Appendix C: Field Logbook
Appendix D: Soil Boring and Well Installation and Visual Classification Logs Appendix E: Soil Gas Sampling Sheets
Appendix F: Geophysical Evaluation Report for 616 Linden, 905 Linden, and 705 Cypress Appendix G: Anomaly 4 Sketch
Appendix H: Updated EPA VISL Inputs and Outputs
Appendix I: Analytical Data Packages and Data Validation Reports Appendix J: Non-Hazardous Waste Manifests
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
vi
ACRONYMS AND ABBREVIATIONS
μg/L Micrograms per liter
AAI All Appropriate Inquiries
ABCA Analysis of Brownfields Cleanup Alternatives
amsl Above mean sea level
Applicant City of South San Francisco and Friends of Parks ASTM ASTM International
Atlas Atlas Technical Consultants, LLC
bgs Below ground surface
BTEX Benzene, toluene, ethylbenzene, and xylene
CERCLA Comprehensive Environmental Response, Compensation, and Liability Act CFR Code of Federal Regulations
CSM Conceptual site model
DCE Dichloroethene
DTSC California Department of Toxic Substances Control
DPT Direct-push technology
EDB 1,2-Dibromoethane
EDC 1,2-Dichloroethane
EDR Environmental Data Resources, Inc.
EDR Report EDR Radius Map Report
EM Electromagnetic
EPA U.S. Environmental Protection Agency
ESA Environmental site assessment
ESL Environmental screening level
GPS Global positioning system
GPR Ground-penetrating radar
IDW Investigation-derived waste
LUST Leaking underground storage tank
mg/kg Milligrams per kilogram
MS Matrix spike
MSD Matrix spike duplicate
MTBE Methyl tertiary-butyl ether
NRCS Natural Resources Conservation Service
PAH Polycyclic aromatic hydrocarbon
PCE Tetrachloroethene
PID Photoionization detector
ppm Parts per million
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
vii
ACRONYMS AND ABBREVIATIONS (CONTINUED)
QA Quality assurance
QAPP Quality assurance project plan
QC Quality control
QMP Quality management plan
RBSL Risk-based screening level
RCRA Resource Conservation and Recovery Act
REC Recognized environmental condition
REPA RCRA Enforcement, Permitting, and Assistance
RSL Regional screening level
RWQCB San Francisco Bay Regional Water Quality Control Board SAP Sampling and analysis plan
Site South San Francisco – Linden and Cypress Aves
SL Screening level
SMCGPP San Mateo County Groundwater Protection Program
STLC Soluble threshold limit concentration
TBA Targeted brownfields assessment
TCE Trichloroethene
TCLP Toxicity characteristic leaching procedure
Toeroek Team Toeroek Associates, Inc. and Tetra Tech, Inc.
TPH Total petroleum hydrocarbons
TPH-d Total petroleum hydrocarbons as diesel
TPH-g Total petroleum hydrocarbons as gasoline
TPH-mo Total petroleum hydrocarbons as motor oil
TTLC Total threshold limit concentration
USDA U.S. Department of Agriculture
USGS U.S. Geological Survey
UST Underground storage tank
VEC Vapor encroachment concern
VISL Vapor intrusion screening level
VOC Volatile organic compound
wear metals Cadmium, chromium, lead, nickel, and zinc
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
ES-1
EXECUTIVE SUMMARY
The U.S. Environmental Protection Agency (EPA) Region 9 Targeted Brownfields Assessment Program tasked Toeroek Associates, Inc. and Tetra Tech, Inc. (Toeroek Team) to conduct a Targeted Brownfields Assessment (TBA) Phase I/II Environmental Site Assessment (ESA) of the South San Francisco – Linden & Cypress Avenues (Aves) site ( the Site) located at 616 Linden Avenue (616 Linden), 700 Linden Avenue (700 Linden), 905 Linden Avenue (905 Linden), and 705 Cypress Avenue (705 Cypress) located in South San Francisco, San Mateo County, California (Figure 1). The Toeroek Team conducted this TBA Phase I/II ESA in accordance with the ASTM International (ASTM) Standards E1527-13 and E1903-19 for Phase I and Phase I/Phase II ESAs, respectively, and otherwise in compliance with EPA’s “All Appropriate Inquiries” Rule (AAI Rule) (40 Code of Federal Regulations [CFR] Part 312) (ASTM 2013, 2019).
The Toeroek Team’s Phase I ESA report, which recommended further investigation of the Site, is in Appendix A to this report.
The purposes of the Phase I/Phase II ESAs were to: (1) confirm the presence or absence of recognized environmental conditions (RECs) identified during the Phase I ESA; (2) acquire information regarding the nature of contamination (if present) and risks posed by that contamination that would support informed business decisions about the property; and (3) where applicable, satisfy the innocent purchaser defense under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (ASTM 2019).
The Phase I ESA identified the following RECs:
• The potential for vapor intrusion associated with previous automotive repair shop activities, former underground storage tanks (USTs) at 616 Linden, and documented contamination left on the site. • There may be five USTs not yet located at 616 Linden. • The potential for vapor intrusion associated with previous gas station activities, former USTs at 905 Linden, and documented contamination left on the site. • A former dry-cleaning facility at 612 Linden Avenue is located 27 feet south and across the street from the site, which is upgradient and has the potential to migrate onto the site. • A property approximately 350 feet downgradient to 930 Linden is currently being investigated for a trichloroethene release that has the potential to migrate onto the site.
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
ES-2
The Phase I ESA identified the following environmental concerns:
• Aerial deposition of lead from exhaust fumes from vehicles and aircraft, which is highest in urban areas near freeways and highways, may be a potential source of contamination at 700 Linden and 705 Cypress.
• Organochlorine pesticides may have been used by former residents around yards and building foundations at 705 Cypress.
• Because of the subsurface chemical breakdown of petroleum hydrocarbons, arsenic is a potential concern to have mobilized into groundwater at 616 Linden and 905 Linden and to off-site properties.
The proposed land use does not include future use of groundwater; so groundwater is only a concern for this ESA for its influence on soil gas and potential vapor intrusion. Arsenic is not volatile and not a potential contaminant of concern in soil gas.
During the Phase II ESA, geophysical surveys, soil gas, groundwater, and soil sampling were conducted. The geophysical survey results identified an electromagnetic anomaly at 616 Linden as an additional potential environmental concern. The anomaly, which was determined to be a subsurface concrete structure with a piece of metal in it, was investigated during the Phase II ESA.
Review of analytical data from the Phase II ESA led to the following noteworthy findings (also shown in Figure 10 and Figure 11):
• 616 Linden: 1,2-dichloroethane (EDC), benzene, ethylbenzene, m,p-xylene, o-xylene, and toluene concentrations in soil gas samples exceeded applicable screening levels (SLs) for soil gas.
Concentrations of total petroleum hydrocarbons as diesel (TPH-d) in soil exceeded applicable SLs. • 616 Linden (subsurface concrete structure contents): Lead concentrations in soil within the subsurface concrete structure exceeded applicable SLs and are likely not consistent with background concentrations. Additional analytical results indicated soil may safely remain on site; however, if excavated, the soil would be considered non-Resource Conservation and Recovery Act (RCRA) Class I California hazardous waste because of leachable lead. Soils within the subsurface concrete structure are likely not representative of the other on-site soils as they were collected around the metal debris.
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
ES-3
• 905 Linden: Concentration of total petroleum hydrocarbons as gasoline (TPH-g) in soil and groundwater exceeded applicable SLs.
• 700 Linden and 705 Cypress: Results from these properties did not exceed applicable SLs in any samples.
Sampling results from this Phase II ESA confirmed the presence of contaminants in soil gas and soil at 616 Linden and in soil and groundwater at 905 Linden. No contamination was observed at 700 Linden or 705 Cypress.
Recommendations
The following recommendations are suggested to mitigate potential impacts on human health if the Site is designated for residential or commercial use.
• 616 Linden: Soil gas exceedances of SLs may require installing vapor mitigation system(s) in any future buildings, conducting further investigation to determine the source of the soil gas contamination and treatment of the source, or land use controls. • 905 Linden: Groundwater exceedances of SLs could require treatment or institutional controls to prevent exposure or release. Soil exceedances of SLs could require removal, land use controls, treatment, or capping to prevent exposure or release.
An Analysis of Brownfields Cleanup Alternatives should be prepared to evaluate cleanup alternatives to address the constituents reported above SLs in soil gas, groundwater, and soil.
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
1 1.0 INTRODUCTION
The U.S. Environmental Protection Agency (EPA) Region 9 has conducted a Targeted Brownfields Assessment (TBA) Phase I/II Environmental Site Assessment (ESA) for the City of South San Francisco and Friends of Parks (the Applicants) of four parcels of land located at 616 Linden Avenue (hereinafter 616 Linden), 700 Linden Avenue (hereinafter 700 Linden), 905 Linden Avenue (hereinafter 905 Linden), and 705 Cypress Avenue (hereinafter 705 Cypress), in South San Francisco, San Mateo County, California, hereinafter referred to as the Site (Figure 1). The City of South San Francisco and Friends of Parks has an interest in redeveloping the Site for a neighborhood park, a cultural center, affordable housing, mixed-use ground-floor commercial buildings, or some combination of these. The TBA will evaluate the Site for potential environmental concerns. Results of the TBA, presented in this Phase I/ Phase I/Phase II ESA report, and preparation of an associated Analysis of Brownfields Cleanup Alternatives (ABCA), if necessary, will facilitate a more informed decision on the suitability of the Site for the proposed uses.
EPA tasked Toeroek Associates, Inc. and Tetra Tech, Inc. (Toeroek Team) to conduct the TBA under Contract Number 68HERH19D0018, Task Order Number 68HE0920F0007. The Toeroek Team performed this TBA Phase I/Phase II ESA in accordance with the ASTM International (ASTM) Standard E1527-13 for Phase I ESAs and E1903-19 for Phase I/Phase II ESAs, and otherwise in compliance with EPA’s “All Appropriate Inquiries” Rule (AAI Rule) (40 Code of Federal Regulations [CFR] Part 312) (ASTM 2013, 2019).
PURPOSE
The purposes of this TBA Phase I/II ESA were as follows: (1) identify recognized environmental conditions (RECs) during the Phase I ESA (the Phase I ESA Report is provided in Appendix A); (2) during the Phase I/Phase II ESA, confirm or eliminate RECs identified during the Phase I ESA; (3) during the Phase II ESA, acquire information regarding the nature of contamination (if present) and risks posed by that contamination, which would support informed business decisions about the property; and (4) where applicable, satisfy the innocent purchaser defense under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (ASTM 2019). The ASTM standard specifies procedures of the scientific method to characterize property conditions in an objective, representative, reproducible, and defensible manner.
Findings of this TBA Phase I/II ESA Report are limited to areas accessible to Toeroek Team personnel during the Site reconnaissance and subsequent sampling. The TBA Phase I/II ESA was conducted by personnel experienced in recognizing conditions indicative of releases or threatened releases of contamination, as well as both potential short- and long-term environmental hazards and liabilities.
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
2 SCOPE OF WORK
The scope of work for the TBA Phase I/II ESA Report includes the following tasks:
• Review previous assessments of the Site and surrounding properties, if any, to assist with identification of RECs, and to gain a more detailed understanding of the area. • Perform a Phase I ESA (report is included as Appendix A). • Conduct a Site reconnaissance to observe current conditions. • During the Phase II ESA, conduct soil gas, groundwater, and soil sampling to determine whether areas of impacted soil or groundwater exist at the Site. Sampling was to be consistent with the Programmatic Quality Assurance Project Plan (QAPP) approved by EPA on October 8, 2020 (Toeroek Team 2020a), and the site-specific Sampling and Analysis Plan (SAP)/QAPP Addendum approved by EPA on January 22, 2021 (Toeroek Team 2020b). • Perform a geophysical survey at 616 Linden and 905 Linden to determine if any additional underground storage tanks (USTs) or other hazards remain on the sites that were not identified during the Phase I.
• Prepare this TBA Report to summarize findings and conclusions regarding the assessment of the Site and sampling activities in accordance with Phase I/II ESA requirements.
SPECIAL TERMS AND CONDITIONS
The Toeroek Team has prepared this document solely for the use and benefit of EPA, City of South San Francisco, and Friends of Parks. Any use of this document or information herein by persons or entities other than EPA, City of South San Francisco, and Friends of Parks without the express written consent of the Toeroek Team will be at the sole risk and liability of said person or entity. The Toeroek Team will not be liable to EPA, City of South San Francisco, and Friends of Parks or such persons or entities for any damages resulting therefrom. It is understood that this document may not include all information pertaining to the Site.
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
3 PERSONNEL PERFORMING TBA
The following Toeroek Team personnel performed this TBA Phase I/II ESA:
• Dayna Aragon, Project Manager — Ms. Aragon was responsible for the overall performance of all tasks assigned to the Toeroek Team by EPA and for working with the EPA Quality Assurance (QA) Officer, City of South San Francisco, and Friends of Parks to ensure achievement of the project’s QA goals. Ms. Aragon assisted in the development of this Phase I/II ESA TBA Report. • Christine Phillips, Field Manager — Ms. Phillips was responsible for making site observations, implementing the sampling design, and collecting, handling, and generating field documentation of sampling activities. Ms. Phillips also performed the Phase I ESA and wrote the Phase I ESA report.
Ms. Phillips wrote this Phase I/II ESA TBA Report.
• Sarah Cook, Toeroek QA Manager — Ms. Cook was responsible for ensuring that the work performed under the contract is in compliance with Toeroek’s Quality Management Plan (QMP) and EPA quality requirements.
LIMITATIONS AND EXCEPTIONS OF ASSESSMENT
ASTM E1903-19 acknowledges that “No Phase II ESA can eliminate all uncertainty. Professional judgment and interpretation are inherent in the process, and even when exercised in accordance with the objective scientific principles, uncertainty is inevitable.” Furthermore, ASTM E1903-19 states that “[t]here is a point at which the cost of information obtained, or the time required to gather it outweighs the usefulness of the information and, in fact, may be a material detriment to the orderly completion of transactions.” This TBA Phase I/II ESA Report presents results of the reconnaissance at the Site and surrounding properties, and of sampling activities conducted March 1 through 5, 12, and 15, 2021; and a review of property, government, and historical records. Information used to complete this Report was reasonably ascertainable, and visually and physically observable. Any data gaps identified during Phase II ESA activities are discussed in Section 7.0.
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
4 2.0 PROJECT AREA DESCRIPTION
The Site is located at 616 Linden, 700 Linden, 905 Linden, and 705 Cypress in South San Francisco, San Mateo County, California (Figure 1), and occupies 0.32 acre, 0.34 acre, 0.27 acre, and 0.29 acre parcels of land, respectively, in an urban area. The Site is surrounded by residential properties, commercial businesses, and undeveloped land. The Site includes an active parking lot at 616 Linden (Figure 2); vegetated and undeveloped land at 700 Linden and 905 Linden (Figure 3 and Figure 4, respectively); and a public neighborhood park with basketball courts and a play area at 705 Cypress (Figure 5). The City of South San Francisco, one of the Applicants, owns the Site.
The U.S. Geological Survey (USGS) 7.5-minute series San Francisco South and USGS 15-minute series San Mateo topographic quadrangle maps (USGS 2020) depict the Site. Coordinates at the approximate center of 616 Linden are 37° 39’ 31.30” north latitude and -122° 24’ 30.99” west longitude. Coordinates at the approximate center of 700 Linden are 37° 39’ 33.22” north latitude and -122° 24’ 30.44” west longitude.
Coordinates at the approximate center of 905 Linden are 37° 39’ 43.32” north latitude and -122° 24’ 28.18” west longitude. Coordinates at the approximate center of 705 Cypress are 37° 39’ 31.77” north latitude and -122° 24’ 24.49” west longitude.
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
5 3.0 SITE CONDITIONS
The Toeroek Team evaluated physical characteristics of the Site and surrounding areas during Site reconnaissance. The Toeroek Team reviewed historical documents (including topographic maps and aerial photographs) to gather information about the Site. In addition, the Toeroek Team reviewed published documents, maps, and observations of the Site to gain information about topography, geology, hydrogeology, soils, flood zones, and presence of waters of the United States at the Site.
HISTORICAL BACKGROUND AND PREVIOUS INVESTIGATIONS
Based on a review of aerial photographs, Sanborn maps, and previous investigation reports, 616 Linden was undeveloped until between 1910 and 1925 when a single-family home and garage were built on the southern end of the property. Between 1943 and 1946, the home and garage were torn down and an automotive shop (Volante Automotive) was built along with a used car lot and a parking lot. Volante Automotive ceased operations in the early 2000s. The current parking lot on the property was built between 1998 and 2006 (Environmental Data Resources, Inc. [EDR] 2020a; EDR 2020c; EDR 2020d; San Mateo County Groundwater Protection Program [SMCGPP] 2001).
Linden Cleaners was previously located 27 feet from the Site at 612 Linden Avenue (across the street from 616 Linden [Figure 2]). The facility operated from 1969 to 1974. Because of the proximity of the historical dry cleaner to 616 Linden, this facility is a potential off-site source of contamination and a REC to the Site.
At 616 Linden, environmental investigations and remediation activities associated with Volante Automotive were conducted between July 1993 and February 2001. On July 13, 1993, one 1,000-gallon gasoline UST and one 250-gallon waste oil UST were excavated from the property following detection of a leak. Soil samples were collected at the time of the UST excavations within excavation pits and soil stockpiles. Because elevated concentrations of hydrocarbons were present in the former UST pits, the pits were excavated again on August 25 and October 21, 1993, and additional confirmation samples were collected. Monitoring wells were installed in 1994 and 1996 to facilitate groundwater monitoring, which occurred until January 2001. The case closure memorandum states that 616 Linden qualified for closure under the RWQCB 1995 Interim Guidance on Required Cleanup at Low Risk Fuel Sites (RWQCB 1996). However, the qualification for closure did not include the requirement to assess the potential for vapor intrusion. Therefore, the potential for vapor intrusion of petroleum-related VOCs at the site is a REC to the subject property that should be investigated further (SMCGPP 2001). See Appendix A for more details on remediation activities at 616 Linden.
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
6 On August 4, 2020, during a Phase I ESA site visit, no RECs were identified at 616 Linden. De minimis staining was observed throughout the parking lot and appears to be fluid drips from parked cars. Based on information provided by the Applicant and findings from the Phase I ESA (Appendix A), residual petroleum compounds were suspected to be present at 616 Linden.
Based on a review of aerial photographs and Sanborn maps, 700 Linden has remained undeveloped (Figure 3). No environmental investigations have been conducted, and no contaminants are suspected aside from the possibility of historical aerial deposition of lead from exhaust fumes from vehicles and aircraft, which is highest in urban areas near freeways and highways (California Department of Toxic Substances Control [DTSC] 2016). On August 4, 2020, during a Phase I ESA site visit, no RECs or environmental issues were identified aside from potential historical aerial deposition of lead (EDR 2020a; EDR 2020c; EDR 2020d).
Based on a review of aerial photographs, and previous investigation reports, 905 Linden (Figure 4) was undeveloped until a gas station was built between 1946 and 1956. Four USTs formerly present at 905 Linden were removed by November 1998, at which time the property became a vegetated lot. 905 Linden currently hosts a vegetated lot with sod, a sprinkler system, a sign, a fence to the south and west, ornamental vegetation to the south and west, and ornamental boulders to the north and east (EDR 2020a; EDR 2020c; EDR 2020d; SMCGPP 2003).
Environmental investigations, remediation activities, and monitoring were conducted between December 1985, when a LUST was discovered, and October 2003. A monitoring well was installed and sampled from 1990 through 1998 (SWRCB 2020). Multiple site features were removed, over-excavated, and investigated, including a 4,000-gallon diesel UST, a 8,000-gallon gasoline UST, a 6,000-gallon gasoline UST, a 1,000-gallon waste oil tank, a dispenser island, a pipeline from the USTs to the dispenser island, inlets from the service bays to the waste oil tank, hoists, a water collection sump, and an oil-water separator. Six additional monitoring wells were established, and groundwater sampling occurred from February 1999 through November 2003. The well locations were surveyed in April 2002, and a well survey and conduit study (preferential pathway investigation) occurred on January 30, 2003 (EDR 2020c). The wells were destroyed on August 7, 2003. The property was deemed clean by the County of San Mateo Health Services Agency through the SMCGPP, and the case was closed on November 17, 2003 (SWRCB 2020; County of San Mateo Health Services Agency 2003). Overall, 720.93 tons of soil and two truckloads with an unknown quantity of soil were removed from the property and sent for disposal between 1998 and 1999 (County of San Mateo Health Services Agency 2003). The case closure memorandum concluded that 905 Linden qualified for closure despite exceedances of soil Tier 2 risk-based screening levels (RBSLs) for TPH-g and benzene in soil samples Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
7 collected between 5 and 8 feet below ground surface (bgs). According to the case closure memorandum, because groundwater at the site is shallow and most of the soil samples appeared to be either from the capillary fringe or the saturated zone, the presence of TPH-g and benzene above their RBSLs for ceiling value and indoor air exposure criteria in a sandy clayed silt soil was not a concern for potential health impacts (SMCGPP 2003). Furthermore, the TPH-g exceedances were also not deemed a concern because the groundwater RBSLs for TPH-g and TPH-d were based on a general nuisance and odor threshold for TPH.
However, the vapor intrusion pathway was not evaluated; therefore, the potential for vapor intrusion of petroleum-related VOCs at the site is a REC to the subject property and should be investigated (SMCGPP 2003). See Appendix A for more details on remediation activities at 905 Linden.
Rollin J. Lobaugh, Inc., a machine shop, was previously located to the east of 905 Linden at 930 Linden Avenue. The facility is listed as having a leaking underground storage tank (LUST), which was closed in March 2021 (RWQCB 2021). Additionally, an investigation for a trichloroethene (TCE) release on the property is ongoing and remediation is pending. Because of the potential contamination at the site and the distance from 950 Linden, this facility is considered a REC to the Site.
On August 4, 2020, during a Phase I ESA site visit, no RECs or environmental issues were identified for 905 Linden. However, based on the application for the TBA and the Phase I ESA (Appendix A) document review, residual gasoline and diesel compounds could be present at 905 Linden, which is a REC to the Site.
Based on a review of aerial photographs and Sanborn maps, 705 Cypress was undeveloped until between 1910 and 1925 when two residential buildings and a residential garage were built on the western end of the property. Between 1998 and 2006, the park was built (Figure 5). No environmental investigations of the property have been conducted. On August 4, 2020, during a Phase I ESA site visit, no RECs or environmental concerns were identified. Environmental concerns include the possibility of aerial deposition of lead within the ornamental planters at 705 Cypress, and the potential for pesticide use around the footprints of former buildings and within yards (EDR 2020a; EDR 2020c; EDR 2020d).
PHYSICAL SETTING
616 Linden is a 0.32-acre commercial property, located approximately 40 feet above mean sea level (amsl), in an urban area of South San Francisco, California. The property is bounded to the northeast, east, southeast, and west by residential developments; to the north by a vacant vegetated lot (700 Linden); and to the south, southwest, and northwest by small businesses. Uses of surrounding properties include residential, commercial, and vacant land. Figure 2 illustrates the location and boundaries of 616 Linden.
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
8 700 Linden is a 0.34-acre undeveloped lot, located approximately 40 feet amsl, in an urban area of South San Francisco, California. The property is bounded to the north and east by residential developments, south by an active parking lot (616 Linden), and west by commercial buildings and a parking lot. Uses of surrounding properties include residential and commercial. Figure 3 illustrates the location and boundaries of 700 Linden. 905 Linden is a 0.27-acre undeveloped lot, located approximately 40 feet amsl, in an urban area of South San Francisco, California. The property is bounded to the north, east, and west by commercial and industrial buildings, and south and partially west by residential developments. Uses of surrounding properties include residential and commercial. Figure 4 illustrates the location and boundaries of 905 Linden. 705 Cypress is a 0.29-acre commercial property, located approximately 30 feet amsl, in an urban area of South San Francisco, California. The property is bounded to the north, south, and west by residential developments, and east by commercial buildings. Uses of surrounding properties include residential and commercial.
Figure 5 illustrates the location and boundaries of 705 Cypress.
3.2.1 Geologic Setting
San Mateo County lies in the Pacific Border physiographic province of California. The San Francisco Bay region is made up of three complexes. First, the Great Valley complex, which is made up of the Jurassic Coast Range ophiolite, consisting mostly of serpentinite, gabbro, diabase, basalt, and keratophyre. Second, the Great Valley sequence, consisting of sandstone, conglomerate, and shale of Jurassic and Cretaceous age, originally deposited on top of the ophiolite. Then finally, the Franciscan Complex, consisting of graywacke, argillite, basalt, serpentinite, chert, limestone, and other rocks, including sedimentary-matrix mélange, sheared graywacke and argillite matrix containing small- to hill-sized blocks of sedimentary, volcanic, and metamorphic rocks. The three complexes are mostly derived from Jurassic to Cretaceous oceanic crust and pelagic deposits overlain by late Jurassic to late Cretaceous turbidites (Graymer, Jones, and Brabb 2002). Rock stratigraphic unit of the Site is classified in the Mesozoic era, Cretaceous system, and upper Mesozoic series.
The geologic age identification is categorized as eugeosynclinal deposits (EDR 2020c).
According to the U.S. Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) Web Soil survey, soil at the Site is Urban land-Orthents, cut and fill complex (0 to 5 percent slopes). The Urban land-Orthents, cut and fill complex is well drained with very slow infiltration rates, and soils are clayey, have a high water table, or are shallow to an impervious layer (USDA NRCS 2020; EDR 2020c). During the Phase II ESA investigation, soils were observed to be a mixture of silts, clays, sand, and loam with varying colors of brown, orange, and grey.
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
9 3.2.2 Hydrogeology
Regionally, the Site is within the Santa Clara Valley groundwater basin, which is grouped into three hydrogeologic units: a recharge area, an upper aquifer zone, and a lower aquifer zone that hosts the primary drinking water. The recharge area comprises the upper alluvial fan areas where the sediments are highly permeable although intervening leaky aquitards of small lateral extent are common. The central portion of the basin becomes distinctively divided into discrete aquifers within a predominantly clayey section. The “upper aquifer zone” is the term used to group aquifers that occur within 150 feet from the surface. In contrast, the “lower aquifer zone” is the collective name given to aquifers that are deeper than 150 feet. The aquifers are separated by an extensive, thick, compacted aquitard that is essentially impermeable. The aquitard pinches out toward the medial portion of the alluvial fan apron, which enables recharge of both aquifer zones through lateral flow from the common recharge area in the upper reaches of the alluvial fans. Return irrigation, infiltration of areal precipitation, and artificial recharge through the ponds operated by the Santa Clara Valley Water District are significant contributors to the inflow balance of the basin. Outflow is mainly by pumping withdrawal (Ferriz 2001).
A search of the USGS, Federal Reporting Data System Public Water Supply, and state databases did not identify any water wells near the Site (EDR 2020c).
The Site is in the San Francisco Bay Delta Watershed (EPA 2020b). Surface water on the Site likely infiltrates the ground or drain to the San Francisco Bay via storm drains. During the Phase II ESA investigation, shallow groundwater was encountered between 3.65 and 5 feet bgs at 905 Linden at the four locations where groundwater was encountered; groundwater did not infiltrate into the southernmost boring at 5 feet bgs.
Groundwater was not encountered at the other three properties.
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
10 4.0 PHASE I/PHASE II ENVIRONMENTAL SITE ASSESSMENT ACTIVITIES The following subsections describe the scope, field exploration, and methods implemented during the Phase I/Phase II ESA. On October 13 and 14, 2020, Toeroek Team member Christine Phillips oversaw Atlas Technical Consultants, LLC (Atlas) perform geophysical surveys at 616 Linden, 905 Linden, and 705 Cypress; the investigation identified the presence of an anomaly (Anomaly 4) at 616 Linden that warranted further investigation. On March 1 through 5, 12, and 15, 2021, Toeroek Team members Dayna Aragon and Christine Phillips conducted soil gas sampling, groundwater sampling, soil sampling, and an investigation of Anomaly 4.
Photographs taken to document Phase I/Phase II ESA field activities are in Appendix B. Phase I/Phase II ESA activities were documented in a site logbook, a copy of which is in Appendix C.
Field activities were conducted at the Site on March 1 through 5, 12, and 15, 2021. Samples were submitted to EMAX Laboratories in Torrance, California, on March 2, 4, 6, and 16, 2021, and to Eurofins Air Toxics LLC in Folsom, California, on March 5 and 15, 2021. The following sections summarize the geophysical evaluation and associated anomaly investigation, and sampling of soil gas, groundwater, and soil. Sampling locations are depicted on Figure 6 through Figure 9. Samples collected for analyses are summarized in Table 1. All work was conducted in accordance with the SAP/QAPP Addendum (Toeroek Team 2020b), except as noted in Section 4.7.
GEOPHYSICAL EVALUATION
Data gaps were identified during the Phase I ESA with respect to the locations and presence of the USTs at 616 Linden and 905 Linden. To evaluate if USTs or other former underground storage features are still present on site at 616 Linden or 905 Linden, geophysical surveys were conducted at both properties. In addition, a geophysical survey was conducted at 705 Cypress in the vicinity of planned sampling locations to locate utilities in advance of intrusive field work. The full geophysical evaluation report can be found in Appendix F.
On October 14, 2020, Atlas performed a geophysical survey that did not conclusively reveal the presence of a UST at 616 Linden; however, one electromagnetic (EM) anomaly (Anomaly 4), four ground-penetrating radar (GPR) anomalies (Anomalies 1 through 4), and three unidentified lines were detected (Figure 6). Anomaly 4, an irregularly shaped area of 12 feet by 4 feet, was detected in the southwest portion of 616 Linden. Based on the EM and GPR responses, the cause of the anomaly was unknown, but the anomaly was thought to contain metal. The three other GPR anomalies and unidentified lines were centrally located and appeared to have been associated with backfilled excavations related to historical UST removals. Anomalies 1 and 2 are related to the former excavations of a 1,000 gallon UST and 250 gallon waste oil tank; the former feature at Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
11 Anomaly 3 is unknown and may have been service bays within the former automotive service building. The linear features may be abandoned piping. Since Anomaly 4 contained metal and did not appear to be associated with a backfilled excavation, the anomaly was identified as an additional potential environmental concern; Anomaly 4 was further investigated during the Phase II ESA to either identify it as a UST or other REC or rule it out as a potential source of contamination. The investigation is described in Section 4.2.
On October 13, 2020, Atlas conducted a geophysical survey at 905 Linden that did not reveal the presence of a UST; however, a GPR anomaly indicative of disturbed soil and multiple small EM anomalies indicative of buried metal were detected (Figure 8). The GPR anomaly was detected in the central portion of 905 Linden and likely was related to historical excavations. The other smaller EM anomalies were likely caused by buried debris given the size and distribution of the anomalies. None of the findings pose an environmental concern at 905 Linden (Atlas 2020).
ANOMALY INVESTIGATION
Anomaly 4 at 616 Linden was identified as a potential environmental concern and investigated to determine whether it presents a REC to the Site. A small excavator was employed to remove the surface asphalt and investigate the source of the geophysical anomaly. The Toeroek Team uncovered a partial concrete structure with vertical walls extending to three inches bgs. The Toeroek Team excavated until the bottom surface of the structure was found at 34 to 36 inches bgs and removed all the soil from the structure with a broom to investigate the structure’s floor. Soil within the concrete structure was excavated and temporarily stockpiled on plastic sheeting adjacent to the excavation. A metal horseshoe and a 20-inch-by-20-inch metal plate were present in the soil excavated from the concrete structure, which were likely the source of the EM signal during the geophysical survey.
The partial subsurface structure contained a floor, five walls, and a small entrance with steps, thus ruling out the possibility of its use as a sump. All walls were approximately 8- to 10-inches thick and made of an aggregate concrete with gravel. The subsurface portion of a fencepost (metal post surrounded by concrete) was observed just outside the entranceway. Ash was present within soil in the northwestern corner of the structure. No oil stains on the concrete were observed. Based on these observations, the structure may have been a basement-level utility, furnace, or storage room for the former residence and is not considered a REC or environmental concern to the Site. The structure did not appear to be affiliated with fuel or waste oil containment as originally suspected. A full sketch of the anomaly with further details can be found in Appendix G; Appendix B includes photographs of the anomaly. The locations of the anomaly and subsurface concrete structure are shown on Figure 6. The SAP/QAPP Addendum indicated that if the anomaly was a Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
12 tank, sump, or empty tank filled with concrete, soil and groundwater samples would be collected and analyzed for analytes common to petroleum sites (TPHs, wear metals, PAHs, and VOCs) (Toeroek Team 2020b).
Since the structure was concrete with no apparent contamination, samples were not collected for analysis of analytes common to petroleum sites.
Soil from multiple locations within the temporarily stockpiled soil was screened for volatile organic compounds (VOCs) using a photoionization detection (PID); no readings exceeded 10 parts per million (ppm). At the direction of EPA Region 9 while in the field, one 5-point composite sample (sample ID 616-EC-03012021) was collected from the stockpile and analyzed for Title 22 metals to assist the City of South San Francisco with characterizing the soil for potential future disposal because of debris found within the soil; however, the stockpiled soil was ultimately placed back into the excavation as discussed below. In addition, the Toeroek Team advanced a boring at approximately the center of the subsurface structure using a hand auger at the location of a thin crack in the structure floor and collected one discrete soil sample (sample ID 616-SB-7-03012021) between 0 and 4 inches below the slab at approximately 36 to 40 inches bgs (Figure 6). The Toeroek Team placed the samples into 8-ounce glass jars with a Teflon-lined caps. The samples were collected using plastic scoops and homogenized in a clean resealable Ziploc bag. Sample jars were labelled and stored on ice in an insulated cooler before delivery to the EMAX Laboratory for waste characterization. The stockpiled soil was returned to the subsurface concrete structure, compacted using a sheepsfoot compactor, and the parking lot surface was restored with asphalt.
SOIL GAS SAMPLING
Soil gas samples were collected at five locations at 616 Linden and one location at 905 Linden to determine if any contamination present at the properties could affect redevelopment as a residence, park, or business.
Based on the historical use of the two properties, biased sampling was selected as the most appropriate sampling approach to assess potential soil gas contamination. The Toeroek Team collected soil gas samples at locations downgradient of former USTs, former dry cleaners, and former automotive shop and gas station amenities. Soil gas samples were collected at five locations at 616 Linden to assess impacts on soil gas from historical and current site activities (Table 1, Figure 6). A soil gas sample and a duplicate were collected at 905 Linden from location GW-5 because groundwater could not be collected at that location (see Section 4.7) (Table 1, Figure 8). Results are discussed in Section 5.2. Soil borings and temporary soil gas well installations were documented in the soil boring and well installation and visual classification logs, copies are provided in Appendix D. All soil gas sampling observations were recorded in the soil gas sampling sheets, copies are provided in Appendix E.
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
13 4.3.1 616 Linden
To determine whether contaminants from the former dry cleaners, former USTs, and former automotive shop amenities have migrated into the neighboring environment, discrete soil gas samples were collected downgradient of each potential source of contamination (Figure 6). Using a hand auger and concrete corer, the Toeroek Team advanced five borings to 5 feet bgs on March 2, 2021. A temporary soil gas well was installed at each soil boring location. Helium served as a tracer gas during soil gas sampling. Oxygen data was also collected to assess whether soils are aerobic. The soil gas samples were collected on March 4 and 12, 2021, using helium shroud methods in a SUMMA® canister, which were then labeled and delivered to the laboratory. Soil gas sampling locations were determined by use of a global positioning system (GPS) unit and recorded in the field logbook. All soil gas samples were analyzed for VOCs (benzene, toluene, ethylbenzene, and xylene [BTEX], methyl tertiary-butyl ether [MTBE], naphthalene, 1,2-dibromoethane [EDB], and 1,2-dichloroethane [EDC]), helium, and oxygen. Additionally, a sample from sampling location SG-6, which is downgradient of a former dry cleaner at an adjacent property, was also analyzed for the following potential dry cleaner-related contaminants: dichloroethenes (DCEs) (1,1-DCE, cis-1,2-DCE, and trans-1,2-DCE), tetrachloroethene (PCE), TCE, and vinyl chloride.
Sampling location SG-5 was not sampled because Anomaly 4 was not considered a REC and an upgradient investigation of the area was not needed. Following sampling, the temporary soil gas well tubing was removed and the parking lot surface was restored. Table 1 summarizes the soil gas samples collected during this Phase II ESA.
4.3.2 905 Linden
The Toeroek Team advanced a boring to 5 feet bgs using a direct-push technology (DPT) rig at sampling location GW-5. The boring was left to fill with groundwater overnight; however, no groundwater entered the boring. Since groundwater could not be sampled per the SAP/QAPP Addendum, a temporary soil gas well was installed on March 4, 2021. A discrete soil gas sample and duplicate (905-SG-5-03042021, 905-SG-5- 03122021-D) were collected on March 12, 2021, using the same methods as discussed above for 616 Linden, to determine whether contaminants from the former gas station pose a vapor intrusion risk (Figure 8). The soil gas sampling location was determined by use of a GPS unit and coordinates were recorded in the field logbook. The soil gas sample was analyzed for VOCs (BTEX, MTBE, naphthalene, EDB, and EDC).
Following sampling, the temporary soil gas well tubing was removed and the soil surface was restored.
Table 1 summarizes the soil gas samples collected during this Phase II ESA.
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
14 GROUNDWATER SAMPLING
Four groundwater samples and one duplicate were collected at 905 Linden to determine if any contamination present at this property could affect redevelopment as a park, residence, or business. Based on the historical use of the property, biased sampling was selected as the most appropriate sampling approach to assess potential groundwater contamination. The Toeroek Team collected groundwater samples at four of the five planned locations near the former gas station amenities (Table 1, Figure 8); groundwater did not enter the boring at sampling location GW-5 and could not be collected as described in Section 4.3.2. Results are discussed in Section 5.3. Soil borings and well installations were documented in the soil boring and well installation and visual classification logs in Appendix D.
Using a hand auger (sampling locations GW-1, GW-2, and GW-3) and a DPT rig (sampling locations GW-4 and GW-5), the Toeroek Team advanced five borings to 5 feet bgs. Using a peristaltic pump, the Toeroek Team collected two grab groundwater samples from water that infiltrated the 5-foot soil borings at sampling locations GW-1 and GW-3. Water quality parameters were measured by use of a water quality meter to facilitate calculation of the final groundwater vapor intrusion screening values. Samples were collected in appropriate jars, labeled, put on ice within an insulated cooler, and sent to the laboratory. Groundwater sampling locations were determined by use of a GPS unit and coordinates were recorded in the field logbook.
Groundwater samples from GW-1 and GW-3 were analyzed for VOCs (BTEX, MTBE, naphthalene, t-Butyl alcohol, and chlorinated VOCs) and TPH (TPH-g, TPH-d, and total petroleum hydrocarbons as motor oil [TPH-mo]).
The remaining three borings (GW-2, GW-4, and GW-5) were left to fill with groundwater overnight; however, no groundwater entered the borings and temporary soil gas wells were installed within the borings instead. When the Toeroek Team attempted to sample soil gas through the temporary wells at GW-2 and GW-4, water entered the soil gas tubing, so a peristaltic pump was used to collect a water sample through the soil gas well materials. At these locations, only a limited volume of water was available; therefore, sufficient volume for TPH-mo, TPH-d, and water quality parameters could not be collected. Groundwater samples from GW-2 and GW-4 were analyzed for VOCs (BTEX, MTBE, naphthalene, t-Butyl alcohol, and chlorinated VOCs) and TPH-g. As described above in Section 4.3.2, at sampling location GW-5, no groundwater entered the boring and a soil gas sample was collected instead. Following sampling, the surface soil was restored to original conditions. Table 1 summarizes the groundwater samples collected during this Phase II ESA.
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
15 SOIL SAMPLING
Surface soil samples were collected at 700 Linden and 705 Cypress and subsurface soil samples were collected at 616 Linden and 905 Linden to determine if any contamination present at the Site could affect redevelopment as a residence, park, or business. Based on the historical use of the Site, biased sampling was selected as the most appropriate sampling approach to assess potential soil contamination. The Toeroek Team collected one discrete subsurface soil sample each at 616 Linden and 905 Linden where PID readings exceeded 100 ppm during soil boring and temporary well installation. The Toeroek Team collected four 5-point composite surface soil samples throughout 700 Linden where land had remained undisturbed. The Toeroek Team collected one 5-point composite surface soil sample at 705 Cypress within an area of decorative vegetation and four discrete surface soil samples in the footprint of the former buildings. Soil samples were collected at a total of 11 locations throughout the Site to assess impacts on soil from historical and current Site activities (Table 1, Figure 6 through Figure 9). Results are discussed in Section 5.4. Soil borings and well installations were documented in the soil boring and well installation and visual classification logs in Appendix D.
4.5.1 616 Linden
During the temporary soil gas well installation and soil classification at sampling location SG-4, located downgradient of a former excavation, an elevated PID reading of 244.5 ppm between 4 and 5 feet bgs and a strong petroleum odor were observed. To determine whether contaminants from the former dry cleaners, former USTs, and/or former automotive shop amenities have migrated into the soil, a discrete soil sample was collected (Figure 6). The Toeroek Team collected a sample from the 4 to 5 feet bgs depth interval, where the highest PID reading was observed, placed the discrete sample and the duplicate (616-SB-4-03022021, 616-SB-4-03022021-D) into an 8-ounce glass jar with a Teflon-lined cap and Terra Core vials for VOC analysis, and recorded the soil sample in the field logbook. Sample jars were labelled and stored on ice in an insulated cooler before delivery to the laboratory. The soil sample was analyzed for VOCs (BTEX, MTBE, naphthalene, t-Butyl alcohol, and chlorinated VOCs); 16 priority pollutant polycyclic aromatic hydrocarbons (PAHs); cadmium, chromium, lead, nickel, and zinc (wear metals); and TPH (TPH-g, TPH-d, and TPH-mo).
Following sampling, the parking lot surface was restored.
Soil from soil borings was drummed as investigation-derived waste (IDW) in a 55-gallon drum and stored on the property until waste characterization was complete; the minimal decontamination water produced was poured over the soil. The IDW soil was profiled, removed from the property on April 26, 2021, and disposed of as non-hazardous soil.
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
16 As discussed in Section 4.2, two pre-characterization samples (sample IDs 616-EC-03012021 and 616-SB-7- 03012021) were collected at the direction of EPA Region 9 while in the field from soil associated with the subsurface concrete structure and analyzed for Title 22 metals to assist the City of South San Francisco with characterizing the soil for potential future disposal because of debris found within the soil.
Copies of analytical data packages are included in Appendix I, and waste manifests are included in Appendix J. Table 1 summarizes the soil samples collected during this Phase II ESA from 616 Linden.
4.5.2 700 Linden
To determine whether aerial deposition of lead from automobiles and aircraft have migrated into the soil, four 5-point composite surface soil samples were collected from 0 to 0.5 feet bgs throughout the property using a shovel and plastic scoops (Figure 7). The five aliquots were placed in a clean gallon-sized resealable bag and homogenized. Each sample was then placed in an 8-ounce glass jar with a Teflon-lined cap. Sample jars were labelled and stored on ice in an insulated cooler before delivery to the laboratory. Soil sampling locations were determined by use of a GPS unit, and soil sampling activities were recorded in the field logbook. All surface soil samples were analyzed for lead. Following sampling, the surface soil was restored to original conditions. Table 1 summarizes the soil samples collected during this Phase II ESA.
4.5.3 905 Linden
During the temporary groundwater boring installation and soil classification at sampling location GW-4, located downgradient of the former gasoline station service bays and office building, elevated PID readings of 382.4 ppm between 3 and 4 feet bgs and 662.4 ppm between 4 and 5 feet bgs coupled with a strong petroleum odor were observed. To determine whether contaminants from the former gas station have migrated into the soil, a discrete soil sample was collected at this location (Figure 8). The Toeroek Team collected a sample from the 4- to 5-feet-bgs depth interval, where the highest reading was observed. The Toeroek Team placed the discrete sample into an 8-ounce glass jar with a Teflon-lined cap and Terra Core vial for VOCs. Sample jars were labelled and stored on ice in an insulated cooler before delivery to the laboratory. The soil sample was recorded in the field logbook and analyzed for VOCs (BTEX, MTBE, naphthalene, t-Butyl alcohol, and chlorinated VOCs), 16 priority pollutant PAHs, wear metals, and TPH (TPH-g, TPH-d, and TPH-mo). Following sampling, the surface soil was restored to original conditions.
Soil from soil borings and decontamination water was drummed as IDW in 55-gallon drums and stored on the property until waste characterization was complete. The soil and decontamination water was profiled, removed from the property on April 26, 2021, and disposed of as non-hazardous soil and water.
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
17 Copies of analytical data packages are included in Appendix I, and waste manifests are included at Appendix J. Table 1 summarizes the soil samples collected during this Phase II ESA.
4.5.4 705 Cypress
To determine whether pesticide contaminants from former residential activities and current landscaping practices have migrated into the surface soil or if aerial deposition of lead from automobiles and aircraft have migrated into the surface soil within the ornamental planter, four discrete surface soil samples were collected near the footprint of the former residential buildings and one 5-point composite surface soil sample was collected along the ornamental planter (Figure 7). The Toeroek Team used a concrete corer to remove concrete and asphalt from three sample locations; the other locations were collected from exposed soil. Using plastic scoops, the Toeroek Team collected four discrete soil samples from 0 to 0.5 feet bgs. The Toeroek Team also collected one 5-point composite sample from 0 to 0.5 feet bgs within the planter. The five aliquots were placed in a clean gallon-sized resealable bag and homogenized. Each sample was then placed in an 8-ounce glass jar with a Teflon-lined cap and labelled and stored on ice in an insulated cooler before delivery to the laboratory. Surface soil sampling locations were determined by use of a GPS unit. The four discrete surface soil samples were analyzed for lead, and the one composite soil sample was analyzed for lead and pesticides. Following sampling, the surfaces were restored. Table 1 summarizes the soil samples collected during this Phase II ESA.
QUALITY CONTROL SAMPLES
Field quality control (QC) sampling for this investigation included one subsurface soil, one surface soil, one groundwater, and one soil gas field duplicate; and one subsurface soil, one surface soil, and one groundwater matrix spike (MS)/matrix spike duplicate (MSD) sample. The field duplicates and MS/MSD for soil and groundwater samples were analyzed for VOCs, TPH, PAHs, wear metals, lead, and pesticides, depending on the location and type of sampling conducted. The field duplicates for soil gas samples were analyzed for VOCs, helium, and oxygen. Field duplicate samples were collected to evaluate total method precision.
DEVIATIONS FROM THE SAP/QAPP ADDENDUM
The following deviations from the SAP/QAPP Addendum occurred during Phase I/Phase II ESA activities:
• Sample ID and Media Alterations:
o Soil gas sample location IDs were changed in some cases to reflect sampling medium. For 616 Linden, IDs were changed from “SB” as identified in Worksheet #8 of the SAP/QAPP Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
18 Addendum to “SG” to reflect the primary medium of concern for the site; the single soil sample location was designated SB-4 and is collocated with SG-4. o As described in Section 4.3.2, groundwater was not reached at sampling location GW-5 at 905 Linden. Because groundwater was not encountered, a temporary soil gas well was installed and a soil gas sample was collected in lieu of a groundwater sample. This deviation does not have an impact on the assessment for potential vapor intrusion at 905 Linden because a soil gas sample was collected at the same location.
o As described in Section 4.4, water did not enter three of the borings at 905 Linden (GW-2, GW-4, and GW-5) as expected, so temporary soil gas wells were installed within the borings.
Two of the temporary soil gas wells (GW-2 and GW-4) subsequently filled with groundwater after installation, so groundwater samples were collected using a peristaltic pump through the temporary soil gas well materials. At these locations, only a small volume of water was available, so water quality parameters and samples for TPH-mo and TPH-d could not be collected. This deviation does not impact the assessment for potential vapor intrusion at 905 Linden because a sample for VOCs and TPH-g was collected. Although neither TPH-g nor TPH-d could be collected at sampling location GW-5, neither petroleum compound was detected in any other groundwater sample at the property, and the soil results did not exceed screening levels (SLs). • Anomaly Investigation:
o As described in Section 4.2, the anomaly investigation revealed a partial subsurface concrete structure at 616 Linden that does not seem to be affiliated with fuel or waste oil containment as originally suspected. The subsurface structure does not appear to pose a REC or any other environmental concern to the Site.
• Planned Samples Not Collected:
o As described in Section 4.3.1, the sampling location SG-5 at 616 Linden was not sampled because Anomaly 4 was not considered a REC and an upgradient sample was determined to not be needed. This deviation does not have an impact on site characterization.
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
19 • Additional Samples:
o As described in Section 4.2, after exposing the subsurface concrete structure at 616 Linden and discussing observations with EPA Region 9, one 5-point composite sample (sample ID 616-EC03012021) was collected from the temporary stockpile and one discrete sample was collected at approximately the center of the subsurface structure at the location of a thin crack in the structure floor (sample ID 616-SB-7-03012021) between 0 and 4 inches below the slab at approximately 36 to 40 inches bgs. This deviation will assist the City of South San Francisco with waste characterization of the soil for potential future disposal in the area of Anomaly 4; these results are likely not representative of soils in other areas of the Site. o As described in Section 4.5.1 and Section 4.5.3, a soil sample was collected at sampling location SG-4 at 616 Linden and at location GW-4 at 905 Linden because of PID readings over 100 ppm.
The additional samples were analyzed for TPHs, wear metals, PAHs, and VOCs, and improved site characterization at 616 Linden and 905 Linden.
• Modifications to SLs:
o Additional SLs (EPA vapor intrusion screening levels [VISLs] for a target groundwater concentration with a target hazard quotient of 1 for both residential and commercial use [EPA 2021]) were identified for TPH-g and TPH-d and used to evaluate the vapor intrusion pathway.
EPA’s VISLs are risk-based screening values that assist in identifying sites or buildings unlikely to pose a health concern through the soil gas intrusion pathway. Generally, when subsurface concentrations of vapor-forming chemicals, such as those in groundwater or “near source” soil gas, fall below the recommended screening levels (i.e., VISLs), no further action or study is warranted. No VISL is available for TPH-mo because it is not volatile. This deviation supports the assessment of risk for the potential vapor intrusion pathway at 905 Linden.
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
20 5.0 PHASE I/PHASE II ASSESSMENT RESULTS
The following sections present analytical data from the soil gas, groundwater, and soil investigations, and the QC samples collected during the Phase II ESA.
SOIL GAS SAMPLING RESULTS
Soil gas sample results from this ESA were compared to EPA VISLs for residential and commercial soil gas (EPA 2021) and RWQCB environmental screening levels (ESLs) for residential and commercial soil gas (RWQCB 2019).
Comparisons of analytical data to applicable screening values appear in Table 2 and Table 3, and results for analytes exceeding the screening values are reported in Figure 10. Copies of analytical data packages and a data validation report are included in Appendix I.
Seven soil gas samples (including one duplicate) were collected from six soil gas sampling locations (five locations at 616 Linden and one location at 905 Linden). Soil gas sample locations, sample depths, and analyses are summarized in Table 1, and soil gas sample locations are shown on Figure 6 and Figure 8. Soil gas samples were submitted to Eurofins Air Toxics LLC for VOCs, helium (tracer gas), and oxygen analyses.
Table 2 and Table 3 list the analytical results from all soil gas samples collected during this Phase II ESA.
Copies of analytical data packages and a data validation report are included in Appendix I.
5.1.1 VOCs
At 616 Linden, EDC, benzene, ethylbenzene, and xylenes were detected at concentrations above SLs at sampling location SG-1, which is north of the former automotive repair station. EDC and BTEX were detected at concentrations above SLs at sampling location SG-2. The source of contamination for this sample location is likely from the former 1,000-gallon gasoline UST that was previously excavated. Benzene was detected at concentrations above the SLs at sampling location SG-4. The source of contamination for this sample location is likely from the apparent backfilled excavation detected with GPR; however, no further information is known about that excavation. There were low concentrations of BTEX and PCE (a dry cleaning solvent) detected in the sample collected from SG-6, but only benzene exceeded the SL. The source of contamination at this sample location is likely from former dry cleaner or historical automotive repair activities. PCE, EDC, ethylbenzene, m,p-xylene, toluene, o-xylene, and benzene were detected in various samples collected at 616 Linden; however, none of the detections were above SLs. Table 2 summarizes the analytical results for VOCs in soil gas.
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
21 At 905 Linden, the low concentrations of ethylbenzene, m,p-xylene, toluene, o-xylene, and benzene were detected in the soil gas sample; however, none of the detections were above SLs. The duplicate (905-SG-5- 03122021-D) was nondetect for all analytes. Table 13 and Figure 10 summarize the soil gas VOC results that were above SLs at 616 Linden.
5.1.2 Additional Analytes
Helium was employed as a tracer gas and analyzed to confirm that ambient air did not intrude into the six soil gas samples collected. Helium was not detected in any of the samples collected; therefore, the samples were not diluted by ambient air. Oxygen data was also collected to assess whether soils are aerobic. Oxygen concentrations at 616 Linden varied from 1.2 percent at sampling location SG-4 to 15 percent at sampling location SG-3 (located adjacent to an ornamental planter). Samples with low oxygen results (sampling locations SG-1, SG-2, and SG-3) generally correlated with higher concentrations of petroleum-related compounds (for example, BTEX), indicating that biodegradation of hydrocarbons is likely occurring under the surface and depleting the soil of oxygen. The oxygen concentration at 905 Linden was relatively high at 13 percent and located in an area with no exceedances of VOC or TPH SLs. Table 3 summarizes the analytical results for helium and oxygen in soil gas.
GROUNDWATER SAMPLING RESULTS
Groundwater sample results from this ESA were compared to EPA VISLs for residential and commercial groundwater (EPA 2021) and RWQCB ESLs for residential and commercial groundwater (RWQCB 2019).
Comparisons of groundwater analytical data to applicable screening values appear in Table 4 and Table 5.
Copies of analytical data packages and a data validation report are included in Appendix I.
Four groundwater samples were collected at four locations at 905 Linden to assess impacts on the groundwater from historical and current site activities. Groundwater sample locations, sample depths, and analyses are summarized in Table 1, and sample locations are shown on Figure 8. Groundwater samples were submitted to the EMAX Laboratory for analyses of VOCs and TPH; at two of the sample locations (GW-2 and GW-4), sufficient water was not available to analyze for TPH-mo and TPH-d. Table 4 and Table 5 list the detected analytical results for all groundwater samples collected during this Phase II ESA.
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
22 5.2.1 VOCs
At 905 Linden, ethylbenzene, toluene, and naphthalene were detected at one of the four sampling locations, and MTBE, o-xylene, and m,p-xylene were detected at two of the four sampling locations. No other analytes were detected at any of the four sampling locations. Sampling location GW-3 and its duplicate (905-GW-3- 03032021-D) were nondetect for all analytes. VOCs were not detected at or above SLs at any of the four sampling locations. Table 4 summarizes the analytical results for VOCs in groundwater at 905 Linden.
5.2.2 TPH
At 905 Linden, TPH-g was detected at concentrations above the residential EPA VISL (10.4 micrograms per liter (μg/L) in all samples with detected results (locations GW-1, GW-3, GW-4, and GW-5). At sampling location GW-4 adjacent to the former location of the gasoline station service bays, TPH-g was detected at 480 μg/L, which also exceeds the commercial EPA VISL (43.7 μg/L) and the RWQCB Tier 1 ESL for groundwater (100 μg/L for the residential scenario assuming groundwater is a source of drinking water). The source of contamination at 905 Linden is likely from the former gasoline station service bays and other gasoline station activities. TPH-d and TPH-mo were not detected in samples collected at sampling locations GW-1 and GW-3; at two of the sample locations (GW-2 and GW-4), sufficient water was not available to analyze for TPH-mo and TPH-d. Table 5 summarizes the analytical results for TPH in groundwater. Table 14 and Figure 11 present the groundwater TPH results that were above the SLs at 905 Linden.
SOIL SAMPLING RESULTS
Soil sample results from this ESA were compared to EPA RSLs for residential and commercial soil (EPA 2020a) and DTSC SLs for residential and commercial soil (DTSC 2020) for metals, VOCs, and PAHs, and Tier 1 ESLs for TPH (RWQCB 2019).
Comparisons of analytical data to applicable SLs appear in Table 6 through Table 12. Copies of analytical data packages and a data validation report are included in Appendix I.
Two discrete subsurface soil samples were collected at one location at 616 Linden and one location at 905 Linden; four 5-point composite surface soil samples were collected at 700 Linden and one 5-point composite surface soil sample was collected at 705 Cypress; and four discrete surface soil samples were collected at four locations at 705 Cypress to assess potential impacts on the soil from historical and current site activities. In addition, one 5-point composite sample and one discrete sample were collected at 616 Linden to assist the City of South San Francisco with characterizing the soil for potential future disposal.
Soil sample locations, sample depths, and analyses are summarized in Table 1. Sample locations are shown on Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
23 Figure 6 through Figure 9. Soil samples were submitted to the EMAX Laboratory for VOCs, PAHs, metals, TPH, lead, and pesticides analyses. Table 6 through Table 12 list the analytical results for all soil samples collected during this Phase II ESA.
5.3.1 VOCs
Soil samples collected from 616 Linden and 905 Linden were analyzed for VOCs. Benzene, ethylbenzene, m,p-xylene, and o-xylene were only detected in samples collected from 905 Linden. Toluene was detected in samples collected from both 616 Linden and 905 Linden. All other analytes were nondetect in samples collected at both 616 Linden and 905 Linden. The sampling location SB-4 duplicate (616-SB-4-03022021-D) was analyzed for the same VOCs, and all results were nondetect. No VOCs were detected above SLs in samples collected from 616 Linden or 905 Linden. Table 6 summarizes the analytical results for VOCs in soil.
5.3.2 PAHs
Soil samples collected from 616 Linden and 905 Linden were analyzed for PAHs. Benzo(a)anthracene, phenanthrene, and pyrene were only detected in samples collected from 616 Linden. All other analytes were nondetect in samples collected at both 616 Linden and 905 Linden. The sampling location SB-4 duplicate (616-SB-4-03022021-D) had similar results to the original sample. No PAHs were detected above SLs.
Table 7 summarizes the analytical results for PAHs in soil.
5.3.3 Metals
Soil samples collected from 616 Linden and 905 Linden were analyzed for wear metals (cadmium, chromium, lead, nickel, and zinc). All five wear metals were detected at concentrations below SLs in samples collected from 616 Linden and 905 Linden. The sampling location SB-4 duplicate (616-SB-4-03022021-D) had similar results to the original sample. Table 8 summarizes the analytical results for wear metals in soil.
Soil samples were collected to evaluate the near-surface lead concentration in soil at 700 Linden (four locations) and 705 Cypress (five locations). Lead was detected at all nine sampling locations below SLs, including in the duplicate sample (705-SS-5-03042021-D). Table 8 summarizes the analytical results for lead in soil.
Due to the presence of debris in soil, soil samples were collected from the subsurface concrete structure contents at 616 Linden at the direction of EPA Region 9 and analyzed for metals to characterize the soil for potential future waste disposal. A 5-point composite sample was collected from the temporarily stockpiled soil (616-EC-03012021) that was ultimately placed back into the structure. Additionally, a discrete soil sample Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
24 was collected from 3 to 4 inches below the partial concrete structure (616-SB-7-03012021). Both the 5-point composite sample and the discrete soil sample were analyzed for California Title 22 metals via EPA Method 6010 and 7471 and compared to California and federal hazardous waste and leachable waste characterization criteria (Table 9 and Table 10). Because the soil remains on site and metals data is available, the soil results were also compared to EPA regional screening levels (RSLs) for residential and commercial soil (EPA 2020a) and DTSC SLs for residential and commercial soil (DTSC 2020), collectively referred to as SLs below (Table 9).
Metals were detected in both the 5-point composite and discrete samples associated with the subsurface concrete structure located at 616 Linden. Arsenic and lead were detected at concentrations above SLs at sampling location 616-EC-03012021 and arsenic was detected at concentrations above SLs at sampling location 616-SB-7-03012021. Table 9 summarizes the analytical results for metals in soil at these locations.
Arsenic concentrations in both the 5-point composite and discrete samples (8.29 and 8.56 mg/kg, respectively) associated with the subsurface concrete structure located at 616 Linden were above all residential and commercial SLs, and the average USGS background concentration; however, the concentrations were within the USGS San Mateo County background concentration range, and are likely naturally occurring.
Background concentrations of arsenic in soil in San Mateo County range from 1.6 to 10 milligrams per kilogram (mg/kg) with a mean of 4.4 mg/kg and a standard deviation of 1.4 mg/kg (USGS 2021). Arsenic concentrations did not exceed the California total threshold limit concentration (TTLC), indicating that the soil is not a California hazardous waste. Arsenic also did not exceed the California soluble threshold limit concentration (STLC) trigger (based on a 10-fold dilution) or the Resource Conservation and Recovery Act (RCRA) toxicity characteristic leaching procedure (TCLP) trigger (based on a 20-fold dilution), indicating that arsenic would not leach from soil above regulated limits (Table 9).
Chromium has no applicable EPA or DTSC SLs, and results in both the 5-point composite and discrete samples associated with the subsurface concrete structure located at 616 Linden did not exceed the California TTLC. However, chromium concentrations exceed the California STLC trigger (based on a 10-fold dilution) in both samples, so the California Waste Extraction Test (WET) test was used to determine whether chromium leaches from soil at concentrations above regulated limits (Table 9).
The lead concentration (239 mg/kg) in the 5-point composite sample associated with the subsurface concrete structure located at 616 Linden was above the residential DTSC SL and below the commercial DTSC SL, residential EPA RSL, and commercial EPA RSL. The lead concentration is within the USGS San Mateo County background range of 4.1 to 659 mg/kg with a mean of 193 mg/kg and a standard deviation of Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
25 181 mg/kg (USGS 2021) but is substantially higher than lead concentrations detected in soil at the other sample location at 616 Linden (47.4 mg/kg) and the other Site properties, 700 Linden, 905 Linden, and 705 Cypress, which range from 11.8 to 75.7 mg/kg. Therefore, the lead concentration of 239 mg/kg in soil within the concrete structure is likely not consistent with background concentrations in the area of the Site.
The lead concentration within the stockpiled soil was likely impacted by debris discovered in the concrete structure. Lead concentrations in both the composite and discrete samples did not exceed California TTLC; however, both lead concentrations exceeded the California STLC trigger (based on a 10-fold dilution) and the lead concentration in the composite sample exceeded the RCRA TCLP trigger (based on a 20-fold dilution), so the California WET and TCLP test were used to determine whether lead leaches from soil at concentrations above regulated limits (Table 9).
5.3.4 Leachable Chromium and Lead
The 5-point composite sample from the temporarily stockpiled soil (616-EC-03012021) that was ultimately placed back into the structure located at 616 Linden was analyzed for leachable lead and chromium using the California WET with citrate buffer, and for leachable lead using TCLP. The California WET with citrate buffer and TCLP analysis are required to characterize soil for disposal. Based on analytical results for lead exceeding SLs, the composite sample (616-EC-03012021) and the discrete sample (616-SB-7-03012021) collected from immediately below the subsurface concrete structure were also analyzed for leachable lead using the California WET with deionized (DI) water buffer. The California WET with DI water buffer is a less aggressive test using a buffer that is more representative of natural conditions; water percolating through soil that would remain in place. The discrete sample was also analyzed for leachable chromium using the California WET with DI water buffer.
For the composite sample of soil excavated from the concrete structure located at 616 Linden (616-EC03012021), the leachable lead WET result using the citrate buffer for off-site disposal exceeded the California STLC limit; however, the WET result using the DI water buffer for in situ soil did not exceed the California STLC limit (Table 10). The leachable lead TCLP result for off-site disposal for the composite sample was below the TCLP limit. The leachable lead WET results using the citrate buffer indicate that if soil is excavated for off-site disposal in the future, it should be treated or disposed of as a non-RCRA Class I California hazardous waste because of the potential for lead to leach under typically acidic landfill conditions. However, the WET results using the DI water buffer indicate that lead would not leach from in situ soil and threaten water quality, and soil may be left on site without a cap. A cap (such as the pavement currently in place) would be necessary to address direct exposure to in situ soil.
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
26 The chromium WET result using the citrate buffer for the composite sample collected from 616 Linden (616-EC-03012021) was below the California STLC limit and would not limit future on-site activities or off-site soil disposal options.
For the discrete sample of soil beneath the concrete structure located at 616 Linden (616-SB-7-03012021), the WET result using the DI water buffer was nondetect for chromium and lead and did not exceed the California STLC limit (Table 10). The WET result using the DI water buffer indicates that chromium and lead would not leach from soil and threaten water quality, and would not limit future on-site activities.
5.3.5 TPH
Soil samples collected from 616 Linden and 905 Linden were analyzed for TPH. At 616 Linden, TPH-d was detected at concentrations above SLs at sampling location SB-4. The source of contamination at this sample location is likely from the apparent backfilled excavation detected with GPR; however, no further information is known about that excavation. At 905 Linden, TPH-g was detected at concentrations above SLs at sampling location GW-4. The source of contamination for this sample location is likely from the former gasoline station service bays. TPH-g was also detected at a concentration eight times above the RWQCB Tier 1 ESL for soil in the sample collected at sampling location GW-4, where an elevated PID measurement was recorded (see Section 4.5.3) and TPH-g exceeded SLs for groundwater (see Section 5.2.2). TPH-d, TPH-g, and TPH-mo were detected below SLs in samples collected from 616 Linden and 905 Linden. The duplicate (616-SB-4-03022021-D) had similar results to the original sample. The TPH detections in soil were not collocated with high VOC concentrations, which may indicate a high degree of degradation. Table 11 summarizes the analytical results for TPH in soil. Table 15 summarizes the soil TPH results that were above SLs at 616 Linden (Figure 10) and 905 Linden (Figure 11).
5.3.6 Pesticides
At 705 Cypress, soil samples were collected and analyzed for organochlorine pesticides from five locations. 4,4’-Dichlorodiphenyldichloroethylene and cis-chlordane were detected at one of the five sampling locations, and 4,4’-dichlorodiphenyltrichloroethylene was detected at four of the five sampling locations. The sampling location SS-5 duplicate (705-SS-5-03042021-D) had similar results to the original sample. The laboratory did not detect pesticides at concentrations above SLs at any of the five sampling locations. Table 12 summarizes the analytical results for pesticides in soil.
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
27 QUALITY CONTROL SAMPLING RESULTS
QA/QC procedures per the Final Programmatic QAPP (Toeroek Team 2020a) were followed, and no issues were encountered. No equipment rinsate blanks were collected during the Phase II ESA because single-use disposable sample collectors were used. Field duplicate samples were collected (616-SB-4-03022021-D, 705-SS-5-03042021-D, 905-GW-3-03032021-D, and 905-SG-5-03122021-D). Results from the field duplicates are conveyed in Section 5.2, Section 5.3, and Section 5.4.
The Toeroek Team’s data validation reports regarding the EMAX Laboratory and Eurofins Air Toxics LLC analytical data packages are included in Appendix I. Data quality was acceptable for data from all samples. All data (including qualified data) from all analyses were determined to be usable.
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
28 6.0 VAPOR ENCROACHMENT SCREENING
The objective of a vapor encroachment screening is to conduct an initial evaluation to determine whether current or historical practices associated with the Site or surrounding properties could pose a vapor encroachment concern (VEC). ASTM E2600-15 (ASTM 2015) defines a VEC as “presence or likely presence of chemicals of concern vapors in the subsurface of the target property caused by the release of vapors from contaminated soil and/or groundwater on or near the target property as identified by Tier 1 or Tier 2 procedures.”
Tier 1 VEC screening consists of a three-step process to evaluate the Site and surrounding properties according to the following screening process: (1) a search distance test; (2) a chemical of concern test; and (3) a critical distance test. Three possible conclusions result from the Tier 1 screening process:
• A VEC exists.
• A VEC cannot be ruled out.
• A VEC can be ruled out because a VEC does not or is not likely to exist.
The following sections describe the findings of the Tier 1 screening evaluation. Potential VECs were identified in the Tier 1 screening evaluation, so a Tier 2 screening was conducted.
TIER 1 SEARCH DISTANCE TEST
The Toeroek Team completed an initial vapor encroachment screening to determine if a VEC exists in the subsurface below any proposed site structures from hazardous substances, petroleum, and petroleum products that can include VOCs, semivolatile organic compounds, and inorganic volatile compounds. The Tier 1 non-invasive vapor encroachment screening assessed presence of the chemicals of concern within the approximate recommended minimum search distances specified in ASTM E2600-15 Standard Guide for Vapor Encroachment Screening on Property Involved in Real Estate Transactions (ASTM 2015). Table 16 summarizes these minimum search distances.
Based on results of the initial vapor encroachment screening, six facilities with chemicals of concern were identified in the EDR report (Appendix A) within the minimum search distances:
• 616 Linden – Contamination present on site. The closure letter dated February 16, 2001, indicated that TPH-g contamination on site was not an environmental or human health risk unless excavation Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
29 or development of the property is proposed that may encounter impacted soil or groundwater (SMCGPP 2001). Investigation is recommended. See Section 3.1 for more details. • 905 Linden – Contamination present on site. The closure letter dated November 17, 2003, indicated that TPH-g, TPH-d, and benzene contamination on site was not an environmental or human health risk unless excavation or development of the property is proposed that may encounter impacted soil or groundwater (SMCGPP 2003). Investigation is recommended. See Section 3.1 for more details. • 900 Linden Avenue – Contamination present on site. During remediation, one 250-gallon waste oil UST, one 4,000-gallon gasoline tank, and one 8,000-gallon gasoline tank was removed April 1987; and one 1,000-gallon “never used” UST was removed July 1991 associated with Lonati Proprties. To assess contamination on site, five groundwater monitoring wells were installed with 5-15 ft bgs screening levels and monitored between September 16, 2003 through March 26, 2003. Soil samples were also taken March 26, 2003 and April 1, 2003. The closure letter dated December 1, 2004, indicated that hydrocarbon contamination on site was not an environmental or human health risk unless excavation or development of the property is proposed that may encounter impacted soil or groundwater (County of San Mateo Health Services Agency 2004). This site is not part of the area proposed for redevelopment; however, investigation is recommended due to proximity to target sites. • 720 Cypress Avenue – Contamination present on site, but potential contaminants of concern are not mentioned (EDR 2020c). A closure letter was issued but unavailable for review. This site is not part of the area proposed for redevelopment; however, investigation is recommended. • 521 Linden Avenue – Site was listed as a historic dry cleaner and is a VEC to the subject property. It is located approximately 400 feet south of the subject property. (EDR 2020c). • 612 Linden Avenue – Site was listed as a historic dry cleaner and is a VEC to the subject property. It is located approximately 200 feet south of the subject property. (EDR 2020c).
TIER 1 CHEMICAL OF CONCERN TEST
Tier 1 chemical of concern tests were completed at identified properties at the Site to assess the presence of a chemical of concern. Six facilities hosting a chemical of concern were identified by the Tier 1 chemical of concern tests.
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
30 TIER 1 CRITICAL DISTANCE TEST
A critical distance test is completed to determine the distance of potential chemical(s) of concern from a site.
The critical distance is defined as the distance from the nearest edge of a contaminant plume to the nearest site boundary—100 feet for VOC chemicals of concern, 30 feet for dissolved volatile petroleum hydrocarbons, and 100 feet for petroleum light non-aqueous phase liquids accumulating above the water table. Based on the historical uses of the Site and neighboring properties, VOCs are likely present within the critical distance from the Site.
TIER 2 EVALUATION OF SOIL-GAS DATA TEST
Based on the historical uses of the Site and surrounding operations of concern, soil gas, groundwater, and soil sampling were recommended at the Site. Six soil gas samples, four groundwater samples, and 11 soil samples were collected (not including duplicates). Laboratory data from the soil gas samples at 616 Linden indicate the presence of EDC and BTEX above screening levels.
VAPOR ENCROACHMENT CONDITION SCREENING CONCLUSIONS
Based on the results of the vapor encroachment screening and results obtained in the field, a VEC currently exists at 616 Linden. See Table 2 (soil gas results), and Table 6, Table 7, and Table 11 (soil results) for a comparison of all results against SLs.
Based on the results of the vapor encroachment screening and results obtained in the field, a VEC currently exists at 905 Linden. Although VOCs in soil gas and soil were lower than SLs, TPH-g in groundwater exceeds SLs. See Table 2 (soil gas results), Table 4 and Table 5 (groundwater results), and Table 6, Table 7, and Table 11 (soil results) for a comparison of all results against SLs.
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
31 7.0 EXCEPTIONS, DELETIONS, AND DATA GAPS
The Phase I/Phase II ESA of the Site conformed generally to the scope and limitations of ASTM E1903-19.
Exceptions to, or deletions from, this practice include the following:
• Interviews with past owners and operators at the Site did not occur. • Based upon discussion of the Site with the City of South San Francisco, current owner, and information from the Phase I report (Appendix A), additional interviews with operators at the Site were not deemed necessary. This exception is not thought to have materially affected findings and conclusions of the ESA.
Information was available in monitoring reports and case closure memoranda (SMCGPP 2001, 2003). Based on discussion of the Site with the City of South San Francisco and current owner and on the information from the Phase I ESA report (Appendix A), additional interviews with operators at the Site were not deemed necessary. This exception is not thought to have materially affected the findings and conclusions of this Phase II ESA.
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
32 8.0 CONCLUSIONS, OPINIONS, AND RECOMMENDATIONS
This section summarizes significant findings and conclusions, presents the conceptual site model (CSM), and offers recommendations regarding Phase II ESA field activities.
FINDINGS AND CONCLUSIONS
The purposes of the Phase II ESA were to: (1) confirm the presence or absence of RECs identified during the Phase I ESA; (2) acquire information regarding the nature of contamination (if present) and risks posed by that contamination that would support informed business decisions about the property; and (3) where applicable, satisfy the innocent purchaser defense under CERCLA (ASTM 2019).
The Phase I ESA identified the following RECs to the Site:
• The potential for vapor intrusion associated with previous automotive repair shop (Volante Automotive/Dante-Volante Trust) activities and former USTs at 616 Linden and documented contamination left on the site is a REC to the subject property. • There may be 5 USTs not yet located at 616 Linden, which are a REC to the subject property. • The potential for vapor intrusion associated with previous gas station (Texaco/South City Texaco) activities and former USTs at 905 Linden and documented contamination left on the site is a REC to the subject property.
• Linden Cleaners was identified in the EDR report as Map ID A31 and is a former dry-cleaning facility. The facility was previously located 27 feet south and across the street from the subject property at 612 Linden Avenue. Because of the proximity and upgradient location to 616 Linden, this facility is a potential off-site source of contamination and a REC to the subject property. • Rollin J Lobaugh, Inc. was identified in the EDR report as Map ID F38, F39, F40, and F41 and is currently being investigated for a TCE release at 930 Linden Avenue. The investigation is ongoing, and remediation is pending. Because of the distance from 905 Linden (approximately 350 feet downgradient of the site), this facility is considered a REC to the subject property.
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
33 The Phase I ESA identified the following environmental concerns:
• Aerial deposition of lead from exhaust fumes from vehicles and aircraft, which is highest in urban areas near freeways and highways, may be a potential source of contamination at 700 Linden and 705 Cypress and should be investigated further.
• Organochlorine pesticides may have been used by former residents around yards and building foundations at 705 Cypress and should be investigated further. • Changes in geochemistry from the natural breakdown of subsurface petroleum hydrocarbons can promote mobilization of naturally occurring arsenic into groundwater; therefore, mobilization of arsenic is a potential concern at 616 Linden and 905 Linden and to off-site properties. The proposed land use does not include planned future use of groundwater; therefore, the groundwater medium is not part of the assessment of possible human health risk at the subject property. Groundwater is a concern for this ESA only in terms of its influence on soil gas and potential vapor intrusion; however, arsenic is not a potential contaminant of concern in soil gas as it is not volatile.
During the Phase II ESA, soil gas, groundwater, and soil sampling were conducted. Additionally, geophysical surveys were conducted at 616 Linden and 905 Linden to attempt to locate any remaining USTs, and at 705 Cypress to locate utilities. The geophysical survey results identified an electromagnetic anomaly at 616 Linden as an additional potential environmental concern, and the anomaly, which was determined to be two pieces of metal within a subsurface concrete structure filled with soil, was investigated during the Phase II ESA.
Review of analytical data from the Phase II ESA led to the following noteworthy findings summarized below, and presented on Figure 10 and Figure 11, and in Table 17. • 616 Linden: Soil gas sampling was conducted for VOCs (BTEX, MTBE, naphthalene, EDB, and EDC), helium, and oxygen analyses at all locations, and for dry cleaner solvents (DCE, PCE, TCE, and vinyl chloride) at sampling location SG-6 only. Soil sampling was conducted for VOCs, PAHs, wear metals, and TPH analyses at a location that exhibited an elevated PID measurement. At the direction of the EPA Region 9 while in the field, a 5-point composite sample was collected from soil temporarily excavated from the subsurface concrete structure (616-EC-03012021) uncovered during the anomaly investigation, and a discrete soil sample was collected immediately below the subsurface concrete structure (616-SB-7-03012021); both samples were analyzed for metals to characterize the Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
34 soil for potential future disposal because of the presence of debris within the soil. A geophysical investigation conducted as part of the Phase II ESA verified that no additional USTs are present on site. The following exceedances were noted in soil gas and soil:
o EDC soil gas concentrations exceeded all four SLs at sampling locations SG-1 and SG-2. o Benzene soil gas concentrations exceeded all four SLs at sampling locations SG-1, SG-2, and SG-4; whereas at sampling location SG-6, benzene concentrations exceeded the EPA VISL for residential soil gas and RWQCB ESLs for both residential and commercial soil gas. o Ethylbenzene soil gas concentrations exceeded all four SLs at sampling locations SG-1 and SG-2. M,p-xylene concentrations exceeded all four SLs at sampling locations SG-1 and SG-2. o O-xylene soil gas concentrations exceeded all four SLs at sampling location SG-2. o Toluene soil gas concentrations exceeded RWQCB ESLs for both residential and commercial soil gas at sampling location SG-2.
o The TPH-d soil concentration exceeded the RWQCB Tier 1 ESL at sampling location SB-4 (collocated with sampling location SG-4).
o Based on sampling results, the former dry cleaners (Linden Cleaners at 612 Linden Avenue) can be removed as a potential REC to the Site.
o The EM anomaly (Anomaly 4) was determined to be caused by two pieces of metal within a subsurface concrete structure filled with soil and can be removed as an environmental concern to the Site.
o Arsenic was detected at a concentration above residential and commercial SLs at the 5-point composite and discrete soil sampling locations associated with soil within and below the subsurface concrete structure (616-EC-03012021 and 616-SB-7-03012021). All detected concentrations of arsenic were within the USGS-reported background range for arsenic and lead concentrations in San Mateo County; therefore, arsenic concentrations in soil are likely naturally occurring.
o Lead was detected at a concentration above the residential DTSC SL at the 5-point composite location associated with soil within the subsurface concrete structure (616-EC-03012021).
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
35 Although the lead concentration is within the USGS San Mateo County background range, it is substantially higher than lead concentrations detected in soil at the other sample location at 616 Linden and the other Site properties, and is likely not representative of background concentrations in South San Francisco. The lead concentration within the stockpiled soil was likely impacted by debris discovered within the soil in the concrete structure. At the same location, leachable lead in soil is above the California STLC limit based on the WET using the citrate buffer, which indicates that if soil is excavated for off-site disposal in the future, the soil should be treated or disposed of as a non-RCRA Class I California hazardous waste because of the potential for lead to leach under typically acidic landfill conditions. However, the WET result using DI water buffer indicates that lead would not leach from in situ soil and threaten water quality, and soil may be left on site without a cap. A cap (such as the pavement currently in place) would be necessary to address direct exposure to in situ soil based on exceedance of the residential DTSC SL.
• 700 Linden and 705 Cypress: Surface soil sampling was conducted for lead analysis at 700 Linden and lead and pesticide analyses at 705 Cypress. No exceedances were observed in surface soil at these locations.
• 905 Linden: Groundwater sampling was conducted for VOCs and TPH-g analyses at all locations, and for TPH-mo and TPH-d analyses at sampling locations GW-1 and GW-3. Soil sampling was conducted for VOCs, PAHs, wear metals, and TPH analyses at a location that exhibited an elevated PID measurement. A geophysical investigation conducted as part of the Phase II ESA verified that no additional USTs are present on site. The following exceedances were noted in groundwater and soil:
o The TPH-g groundwater and soil concentrations exceeded the EPA VISL for residential groundwater at sampling locations GW-1, GW-3, and GW-4, and the EPA VISL for commercial groundwater and RWQCB Tier 1 ESL at sampling location GW-4. o Based on sampling results, the machine shop (Rollin J. Lobaugh at 930 Linden Avenue) can be removed as a potential REC to the Site.
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
36 CONCEPTUAL SITE MODEL
This Phase II ESA was conducted to gain an understanding of contaminants at the Site and to aid in understanding potential exposure routes that may be present at the Site. This section describes the CSM, which incorporates information from the Phase II ESA.
Based on laboratory analytical results from samples collected, concentrations of EDC and BTEX in soil gas, and TPH-d, arsenic, and lead in soil at 616 Linden were detected above Site SLs (Figure 10).
Based on laboratory analytical results from samples collected, concentrations of TPH-g in groundwater and soil at 905 Linden were detected above Site SLs (Figure 11).
To aid a thorough understanding of the environmental concerns at 616 Linden and 905 Linden, Figure 12 (616 Linden) and Figure 13 (905 Linden) show a graphical presentation of identified contaminants of concern and migration pathways to potential receptors at each respective location.
Exposure pathways are potential routes through which human or environmental receptors could encounter contaminants possibly present at a site.
Exposure pathways presented in the CSM for soil gas and subsurface soil at 616 Linden include the following:
• Inhalation – This pathway is applicable—exposure of receptors to TPH and VOCs from petroleum products via inhalation.
• Dermal absorption – This pathway is applicable—exposure of receptors to TPH and VOCs from petroleum products through direct contact with the skin. • Incidental ingestion – This pathway is applicable—exposure of receptors to TPH and VOCs from petroleum products through active ingestion.
Exposure pathways presented in the CSM for groundwater and subsurface soil at 905 Linden include the following:
• Inhalation – This pathway is applicable—exposure of receptors to TPH from petroleum products via inhalation.
• Dermal absorption – This pathway is applicable—exposure of receptors to TPH from petroleum products through direct contact with the skin.
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
37 • Incidental ingestion – This pathway is not applicable as the groundwater on site is not for human consumption—exposure of receptors to TPH from petroleum products through active ingestion.
Potential receptors are categorized by duration of exposure and types of activities they are expected to perform at the Site. The redevelopment plan for the Site is to build a neighborhood park, a cultural center, affordable housing, mixed-use ground-floor commercial buildings, or some combination of these. The receptor categories indicated in this CSM represent reuse of the property and include the following:
• Residents – Redevelopment plans may include living quarters. Residents would be present at the Site for long durations of time and be potentially exposed to soil, groundwater, and soil gas. • Commercial / Construction Workers – Commercial workers for potential future redevelopment of the Site would be present at any parcel for a relatively short period of time and would be potentially exposed to soil, groundwater, and soil gas.
RECOMMENDATIONS
A VEC remains at 616 Linden. Subsurface soil gas sample locations at this property contained EDC and BTEX at concentrations above SLs (listed in Table 2). If the Site is used for residential or commercial purposes this could require installing vapor mitigation system(s) in any future buildings; conducting further investigation to determine the source of the soil gas contamination and treatment of the source; or land use controls to prevent exposure or release and mitigate potential impacts on human health.
At 616 Linden, subsurface soil contains TPH at concentrations above the Tier 1 ESL, which is based on a generic site model of residential use where groundwater is used as drinking water (listed in Table 11). Soil could require treatment, removal, or capping to prevent exposure or release and mitigate potential impacts on human health if the Site is used for residential purposes where groundwater is used as drinking water. Because of its shallow depth, location in an urban environment, and proximity to the San Francisco Bay, groundwater is unlikely to be used as potable water at the Site.
At 616 Linden, soil within the subsurface concrete structure uncovered during the anomaly investigation contains lead above the residential DTSC SL. The WET results using the DI water buffer indicate that lead would not leach from soil or threaten water quality, and soil may be left on site without a cap. However, a cap (such as the pavement currently in place) would be necessary to address direct exposure to in situ soil. If soil within the subsurface concrete structure is excavated for off-site disposal in the future, the soil should be Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
38 treated or disposed of as a non-RCRA Class I California hazardous waste because of the potential for leachable lead in landfill conditions.
A VEC remains at 905 Linden. Groundwater at sampling locations GW-1, GW-3, and GW-4 contains TPH-g at a concentration above SLs (listed in Table 5). If the Site is used for residential or commercial purposes, this could require treatment to prevent exposure or release and to mitigate potential impacts on human health. No VOCs in groundwater were detected above residential or commercial SLs at 905 Linden.
At 905 Linden, subsurface soil at sampling location GW-4 contains TPH-g at a concentration above the Tier 1 ESL, which is based on a generic site model of residential use where groundwater is used as drinking water (listed in Table 11). Soil could require treatment, removal, or capping to prevent exposure or release and mitigate potential impacts on human health if the Site is used for residential purposes where groundwater is used as drinking water. Groundwater is unlikely to be used as potable water at the Site.
An ABCA should be prepared to evaluate cleanup alternatives required to address the constituents reported above SLs in subsurface soil gas at 616 Linden, soil within the subsurface concrete structure at 616 Linden, and in groundwater and subsurface soil at 905 Linden.
ENVIRONMENTAL PROFESSIONAL STATEMENT
I declare that, to the best of my professional knowledge and belief, I meet the definition of an Environmental Professional, as defined in 40 CFR Part 312.10.
I have the specific qualifications based on education, training, and experience to assess a property of the nature, history, and setting of the Site. I have developed and performed all appropriate inquiries in conformance to the standards and practices set forth in 40 CFR Part 312. ________________________________
Dayna Aragon
Environmental Professional
Tetra Tech, Inc.
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
39 9.0 DISCLAIMERS
This TBA is based on the conditions existing at the Site on the dates of the Site reconnaissance and Site investigation. Past conditions were considered based on readily available records and recollections.
Contamination may possibly be present at the Site that has not been discovered.
The conclusions presented herein are based on information provided to the Toeroek Team, or reasonably available to the Toeroek Team.
The Toeroek Team does not warrant or guarantee the Site suitable for any particular purpose or certify the Site as “clean.”
Future regulatory modifications, agency interpretations, and/or policy changes may affect the compliance status of the Site.
Detailed indoor air quality, vapor intrusion, occupational health and safety, radon, and wetland surveys were neither requested nor included as part of this project.
The Toeroek Team does not warrant or guarantee that information conveyed in the environmental record sources used for this TBA is correct, complete, and/or current. Such information is the product of independent investigation by parties other than the Toeroek Team and/or information maintained by federal, state, and local government agencies.
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
40 10.0 QUALIFICATIONS
Qualified professional staff trained in performance of the scope of work conducted the Phase II ESA and prepared this TBA Report. The team included a QA Manager and a Project Manager/Environmental Professional. Their roles and experience are as follows:
• Sarah Cook, QA Manager – As QA Manager, Ms. Cook is responsible for ensuring that the work performed under the contract is in compliance with Toeroek’s QMP and EPA quality requirements.
She has 20 years of experience in the environmental field. • Dayna Aragon, Project Manager, Environmental Professional – Ms. Aragon was responsible for the overall performance of all tasks assigned to the Toeroek Team by EPA and for working with the EPA QA Officer, City of South San Francisco, and Friends of Parks to ensure achievement of the project’s QA goals. She was also responsible for implementing the sampling design; collecting, handling, documenting, and transporting samples; and generating field documentation of sampling activities. Ms. Aragon assisted in the development of this TBA Report. She has over 20 years of experience in the environmental field.
• Christine Phillips, Field Team Leader, Environmental Professional – Ms. Phillips was responsible for implementing the sampling design; collecting, handling, documenting, and transporting samples; and generating field documentation of sampling activities. Ms. Phillips wrote this TBA Report. She has 3 years of experience in the environmental field.
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
41 11.0 REFERENCES
ASTM International (ASTM). 2013. Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process. E1527-13.
ASTM International (ASTM). 2015. Standard Guide for Vapor Encroachment Screening on Property Involved in Real Estate Transactions. E2600-15.
ASTM International (ASTM). 2019. Standard Practice for Environmental Site Assessments: Phase I/Phase II Environmental Site Assessment Process. ASTM E1903-19. October.
Atlas Technical Consultants, LLC (Atlas). 2020. Geophysical Evaluation: South San Francisco – Linden and Cypress Avenues Targeted Brownfields Assessment. October 30.
California Department of Toxic Substances Control (DTSC). 2016. In the Matter of: Lead Contaminated Soils in State Highway Rights-of-Way. December. https://dtsc.ca.gov/wpcontent/uploads/sites/31/2018/11/DTSC-Caltrans-ADL-Agreement-Signed-w-Exhibits-Final6.30.16.pdf.
California Department of Toxic Substances Control (DTSC). 2020. Updated Human Health Risk Assessment Note 3 – DTSC-Modified Screening Levels. June. https://dtsc.ca.gov/wpcontent/uploads/sites/31/2019/04/HHRA-Note-3-June-2020-A.pdf.
California State Water Resources Control Board (SWRCB). 2020. GeoTracker Case Summary for South City Texaco, 905 Linden, South San Francisco, CA 94080, San Mateo County, LUST Cleanup Site.
August 5.
County of San Mateo Health Services Agency. 2003. Letter Regarding Case Closure for Petroleum Hydrocarbon UST Removed at 905 Linden Avenue, South San Francisco, California. From Dean D.
Peterson, Director of Environmental Health, County of San Mateo Health Services Agency. To Jose Montes, City Mobile Services. November 17.
County of San Mateo Health Services Agency. 2004. Letter Regarding Case Closure for Petroleum Hydrocarbon UST Removed at 900 Linden Avenue, South San Francisco, California. From Dean D.
Peterson, Director of Environmental Health, County of San Mateo Health Services Agency. To Mary Louise Orr. December 1.
Environmental Data Resources, Inc. (EDR). 2020a. EDR Aerial Photo Decade Package. July 23.
Environmental Data Resources, Inc. (EDR). 2020b. EDR City Directory Image Report. July 27.
Environmental Data Resources, Inc. (EDR). 2020c. EDR Radius Map Report with GeoCheck. July 30.
Environmental Data Resources, Inc. (EDR). 2020d. EDR Sanborn Map Report. July 27.
Environmental Data Resources, Inc. (EDR). 2020e. EDR Topo Map Report with QuadMatch. July 24.
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
42 Ferriz, H. 2001. “Groundwater Resources of Northern California: An Overview.” In Engineering Geology Practice in Northern California, edited by H. Ferriz and R. Anderson, pages 19 through 48. Association of Engineering Geologists. Sacramento, California.
Graymer, R.W., D.L. Jones, and E.E. Brabb. 2002. “Geologic Map and Map Database of Northeastern San Francisco Bay Region, California.” U.S. Department of the Interior, U.S. Geological Survey 1-28.
San Francisco Bay Regional Water Quality Control Board (RWQCB). 1996. Supplemental Instructions to State Water Board December 8, 1995, Interim Guidance on Required Cleanup at Low Risk Fuel Sites. January 5. https://ustlowriskpolicy.org/wp-content/uploads/2012/04/1995-01_ClosureCriteria-for-Region-2_Low-Risk.pdf.
San Francisco Bay Regional Water Quality Control Board (RWQCB). 2019. Environmental Screening Levels. https://www.waterboards.ca.gov/sanfranciscobay/water_issues/programs/esl.html.
San Francisco Bay Regional Water Quality Control Board (RWQCB). 2021. “Closure Letter for 930 Linden Avenue, South San Francisco, San Mateo County.” February 28. https://geotracker.waterboards.ca.gov/profile_report.asp?global_id=SL0608188827.
San Mateo County Groundwater Protection Program (SMCGPP). 2001. Case Closure Memorandum, SMCo.
Site No. 550097, APN: 012-174-300, Volonte Automotive, 616 Linden, South San Francisco, California. From Groundwater Protection Program Staff. To File. February 16.
San Mateo County Groundwater Protection Program (SMCGPP). 2003. Case Closure Memorandum, SMCo.
Site No. 550027, APN: 012-101-100, Independent Texaco, 905 Linden, South San Francisco, California. From Charles Ice, Haz-Mat Specialist II. To File. May 30.
Toeroek Associates, Inc. and Tetra Tech, Inc. (Toeroek Team). 2020a. Programmatic Quality Assurance Project Plan. EPA Region 9 TBA Program. October.
Toeroek Associates, Inc. and Tetra Tech, Inc. (Toeroek Team). 2020b. Sampling and Analysis Plan and Quality Assurance Project Plan Addendum, Targeted Brownfields Assessment at South San Francisco - Linden & Cypress Aves. February.
U.S. Environmental Protection Agency (EPA). 2020a. Regional Screening Levels (RSLs) – Generic Tables.
May. http://www.epa.gov/risk/regional-screening-levels-rsls-generic-tables.
U.S. Environmental Protection Agency (EPA). 2020b. “Surf Your Watershed: Smith – 18010101.” Accessed August 11, 2020. https://www.epa.gov/waterdata/surf-yourwatershed?readform&Limit=200&Query=18010101 U.S. Environmental Protection Agency (EPA). 2021. Vapor Intrusion Screening Level Calculator. https://www.epa.gov/vaporintrusion/vapor-intrusion-screening-level-calculator U.S. Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS). 2020. Web Soil Survey. Retrieved August. https://websoilsurvey.nrcs.usda.gov/app/WebSoilSurvey.aspx.
Phase I/Phase II ESA TBA Report
South San Francisco - Linden & Cypress Aves TBA
Final
July 2, 2021
43 U.S. Geological Survey (USGS). 2020. San Francisco, California Quadrangle. USGS 7.5 Minute Topographic Series and USGS 15 Minute Topographic Series.
U.S. Geological Survey (USGS). 2021. Average Concentrations of Elements in San Mateo County, California.
Accessed May 7.
https://mrdata.usgs.gov/geochem/county.php?place=f06081&el=Pb&rf=southwestern.
FIGURES
616 Linden Ave
700 Linden Ave
905 Linden Ave
705 Cypress Ave
Source: ESRI, ArcGIS Online, Open Streets Map Basemap, 2019 C:\Users\Elaia.McDonald\Desktop\Brownfields\GIS\MapFiles\TO13_Fig1_SouthSF_SiteLoc.mxd Figure 1
South San Francisco- Linden & Cypress Aves
Targeted Brownfields Assessment
South San Francisco, California
Site Locations
Date: 8/18/2020 Drawn By: Elaia McDonald Project No: 103Z65210007M Legend
Approximate Site Boundary ±
0 1,000 2,000
Feet
Site Vicinity Scale: 1 inch = 10 miles
Linden Cleaners
(former dry cleaners and potential REC)
Source: ESRI, ArcGIS Online, World Imagery, 2018
P:\EPA_REPA6_Brownfields\PROJECT MANAGEMENT\GIS\GIS\MapFiles\TO13_Fig2_SouthSF_616_SiteFeatures.mxd Figure 2
Current Site Features - 616 Linden Avenue
Date: 9/3/2020 Drawn By: Elaia McDonald Project No: 103Z65210007M Legend
Approximate Site Boundary ±
0 25 50
Feet
South San Francisco- Linden & Cypress Aves
Targeted Brownfields Assessment
South San Francisco, California
Source: ESRI, ArcGIS Online, World Imagery, 2018
P:\EPA_REPA6_Brownfields\PROJECT MANAGEMENT\GIS\GIS\MapFiles\TO13_Fig3_SouthSF_700_SiteFeatures.mxd Figure 3
Current Site Features – 700 Linden Avenue
Date: 12/18/2020 Drawn By: Elaia McDonald Project No: 103Z65210007M Legend
Approximate Site Boundary ±
0 25 50
Feet
South San Francisco- Linden & Cypress Aves
Targeted Brownfields Assessment
South San Francisco, California
Rollin J Lobaugh
(machine shop and potential REC)
Source: ESRI, ArcGIS Online, World Imagery, 2018
P:\EPA_REPA6_Brownfields\PROJECT MANAGEMENT\GIS\GIS\MapFiles\TO13_Fig4_SouthSF_905_SiteFeatures.mxd Figure 4
Current Site Features - 905 Linden Avenue
Date: 12/18/2020 Drawn By: Elaia McDonald Project No: 103Z65210007M Legend
Approximate Site Boundary ±
0 40 80
Feet
South San Francisco- Linden & Cypress Aves
Targeted Brownfields Assessment
South San Francisco, California
Basketball Court
Playground
Source: ESRI, ArcGIS Online, World Imagery, 2018
P:\EPA_REPA6_Brownfields\PROJECT MANAGEMENT\GIS\GIS\MapFiles\TO13_Fig5_SouthSF_705_SiteFeatures.mxd Figure 5
Current and Historical Site Features
- 705 Cypress Avenue
Date: 12/18/2020 Drawn By: Elaia McDonald Project No: 103Z65210007M Legend
Current Site Features
Former Building Footprint
Approximate Site Boundary ±
0 25 50
Feet
South San Francisco- Linden & Cypress Aves
Targeted Brownfields Assessment
South San Francisco, California
!(
!(
!(
!(
!(
!(
3 2
1 Former 250-Gallon
Waste Oil UST
Excavation
Former 1,000-Gallon
Gasoline UST
Excavation
4 Former
Building
Former
Auto
Repair
Shop
Former Dry Cleaner
(612 Linden Avenue)
Former
Residences
SG-6
SG-3
SG-2
SG-1
SB-4
and
SG-4
SB-7
EC5
Source: ESRI, ArcGIS Online, World Imagery, 2018
P:\EPA_REPA6_Brownfields\PROJECT MANAGEMENT\GIS\GIS\MapFiles\TO13_Fig6_SouthSF_616_SampleLocsPost.mxd Figure 6
Sample Locations - 616 Linden Avenue
Date: 6/11/2021 Drawn By: Elaia McDonald Project No: 103Z65210007M Legend
!( Soil Gas Sample
!( Soil and Soil Gas Sample
!( Soil Sample
?@ Former Monitoring Well1
?@ Former Piezometer1
Unidentified Utility Lines2
Groundwater Flow Direction3
Concrete Subsurface Structure 4
Apparent Backfilled Excavation
Detected with GPR2
EM61- GPR Anomaly2
Approximate Site Boundary
Former Buildings
South San Francisco- Linden & Cypress Aves
Targeted Brownfields Assessment
South San Francisco, California
Notes:
1 Removed
2 Identified during the geophysical survey
conducted on October 14, 2020. Anomalies were
assigned numbers to aid in discussion.
3 Based on historical groundwater investigation data.
4 Identified during Phase II anomaly investigation.
Formerly known as Anomaly 4.
5 Soil sample was collected from a temporary
stockpile during the anomaly investigation; soil was
placed back into the subsurface concrete structure
and surface was restored.
Electromagnetic 61
Ground-penetrating radar
Underground storage tank
EM61
GPR
UST
±
0 15 30
Feet
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
SS-4
SS-3
SS-2
SS-1
Source: ESRI, ArcGIS Online, World Imagery, 2018
P:\EPA_REPA6_Brownfields\PROJECT MANAGEMENT\GIS\GIS\MapFiles\TO13_Fig7_SouthSF_700_SampleLoc.mxd Figure 7
Sample Locations – 700 Linden Avenue
Date: 5/21/2021 Drawn By: Elaia McDonald Project No: 103Z65210007M Legend
Approximate Site Boundary
!( 5-Point Composite Soil Sampling
Location
±
0 25 50
Feet
South San Francisco- Linden & Cypress Aves
Targeted Brownfields Assessment
South San Francisco, California
GGG
GGG
GG
GG
GGGGGG
GGGGGG
GGGGGG
GGGGGG
GGGGGG
GGGGGG
GGGGGG
GGGGGG
GGGGGG
GGGGGG
GGGGGGGGG
GGGGGGGGG
GGGGGGGGG
GGGGGGGGG
GGGGGGGGG
GGGGGGGGG
GGGGGGGGG
GGGGGGGGG
GGGGGGGGG
GGGGGGGGG
GGGG
GGGG
GGGG
GGGG
!(
!(
!(
!(
!(
#0
#0
&3
&3
&3
")
")
")
Groundwater
Flow Direction
Former
Service
Bays
Former
Office
GW-2
GW-5
GW-3
GW-1
GW-4
Source: ESRI, ArcGIS Online, World Imagery, 2018
P:\EPA_REPA6_Brownfields\PROJECT MANAGEMENT\GIS\GIS\MapFiles\TO13_Fig8_SouthSF_905_SampleLocsPost.mxd Figure 8
Sample Locations - 905 Linden Avenue
Date: 5/21/2021 Drawn By: Elaia McDonald Project No: 103Z65210007M South San Francisco- Linden & Cypress Aves
Targeted Brownfields Assessment
South San Francisco, California
Notes:
1 Removed
2 Based on historical groundwater investigation data.
Site locations are approximate except for monitoring wells MW-1 through MW-6 and the backfilled excavation, which
were surveyed.
ft bgs Feet below ground surface
GPR Ground-penetrating radar
UST Underground storage tank
±
0 20 40
Feet
Legend
!( Grab Groundwater Sample
!( Soil Gas Sample
!( Soil and Grab Groundwater Sample
?@ Former Groundwater Wells1
#0 Former Hoist
&3 Former UST Fill Covers
") Electric Vault
Former Inlet Pipe
Groundwater Flow Direction2
GG Former Oil Water Separator Excavation (Depth 8 ft bgs) GG Former Piping Location and Pump Island Excavation (1998) (Depth 7 ft bgs) GG UST Excavation (1998) (Depth 12 ft bgs)
GG Former Hoist Excavation (Depth 8 ft bgs)
Apparent Backfilled Excavation Detected with GPR
Former Waste Oil UST Excavation (Depth 6 ft bgs)
Former 4,000-Gallon UST - Diesel
Former 6,000-Gallon UST - Leaded Gasoline
Former 8,000-Gallon UST - Unleaded Gasoline
Former Buildings
Approximate Site Boundary
!( !(
!(
!(
!(
!(
!(
!(
!(
S-3
S-4
S-5
S-2 S-1
Source: ESRI, ArcGIS Online, World Imagery, 2018
P:\EPA_REPA6_Brownfields\PROJECT MANAGEMENT\GIS\GIS\MapFiles\TO13_Fig9_SouthSF_705_SampleLocsPost.mxd Figure 9
Sample Locations - 705 Cypress Avenue
Date: 5/21/2021 Drawn By: Elaia McDonald Project No: 103Z65210007M Legend
!( Discrete Soil Boring Sample
!( !( 5-Point Composite Soil Sample Location
Former Buildings
Approximate Site Boundary
±
0 25 50
Feet
South San Francisco- Linden & Cypress Aves
Targeted Brownfields Assessment
South San Francisco, California
!(
!(
!(
!(
!(
3 2
1 Former 250-Gallon
Waste Oil UST
Excavation
Former 1,000-Gallon
Gasoline UST
Excavation
616-SB-7-03012021
Lead: 239 mg/kg
Former
Building
Former
Auto
Repair
Shop
Former
Residences
616-SG-6-03042021
Benzene: 16 ug/m3
616-SG-2-03042021
1,2-Dichloroethane: 3,000 ug/m3
Benzene: 68,000 ug/m3
Ethylbenzene: 46,000 ug/m3
m,p-Xylene: 200,000 ug/m3
o-Xylene: 29,000 ug/m3
Toluene: 83,000 ug/m3
616-SG-1-03122021
1,2-Dichloroethane: 1,400 ug/m3
Benzene: 9,500 ug/m3
Ethylbenzene: 19,000 ug/m3
m,p-Xylene: 64,000 ug/m3
616-SG-4-03042021
Benzene: 4,400 ug/m3
616-SB-4-03022021
TPH-d: 560 mg/kg
616-SB-4-03022021-D
TPH-d: 300 mg/kg
Source: ESRI, ArcGIS Online, World Imagery, 2018
P:\EPA_REPA6_Brownfields\PROJECT MANAGEMENT\GIS\GIS\MapFiles\TO13_Fig10_SouthSF_616_Exceedances.mxd Figure 10
Sampling Results Exceeding Screening
Levels - 616 Linden Avenue
Date: 6/11/2021 Drawn By: Elaia McDonald Project No: 103Z65210007M Legend
!( Soil Gas Sample
!( Soil and Soil Gas Sample
!( Soil Sample
?@ Former Monitoring Well1
?@ Former Piezometer1
Unidentified Utility Lines2
Groundwater Flow Direction3
Concrete Subsurface Structure 4
Apparent Backfilled Excavation
Detected with GPR2
EM61- GPR Anomaly 2
Former Buildings
Approximate Site Boundary
South San Francisco- Linden & Cypress Aves
Targeted Brownfields Assessment
South San Francisco, California
SSFO-EPA VISLs
(Residential Soil Gas)
SSFO-EPA
VISLs
(Commercial
Soil Gas)
SSFO-WQCB
ESLs
(Residential Soil
Gas)
SSFO-RWQCB
ESLs
(Commercial
Soil Gas)
SSFO-Selected
Project
Screening Level
1,2,-Dichloroethane 3.6 15.7 3.6 16 3.6
Benzene 12 52.4 3.2 14 3.2
Ethylbenzene 37.4 164 37 160 37
m,p-Xylene 3,480 14,600 3,500 15,000 3,480
o-Xylene 3,480 14,600 3,500 15,000 3,480
Toluene 174,000 730,000 10,000 44,000 10,000
Soil Gas
ug/m3
Analyte
±
0 15 30
Feet
Micrograms per cubic meter
California Department of Toxic Substances
Control - Screening Level
Electromagnetic 61
U.S. Environmental Protection Agency
Environmental screening level
Ground-penetrating radar
Milligrams per kilogram
Regional Screening Level
San Francisco Bay Regional Water
Quality Control Board
South San Francisco
Total petroleum hydrocarbons - diesel range
Underground storage tank
Vapor intrusion screening level
Notes:
1 Removed
2 Identified during the geophysical survey
conducted on October 14, 2020.
3 Based on historical groundwater investigation data.
4 Identified during Phase II anomaly investigation.
Formerly known as Anomaly 4.
ug/m3
DTSC SL
EM61
EPA
ESL
GPR
mg/kg
RSL
RWQCB
SSFO
TPH-d
UST
VISL
RWQCB Tier 1 ESLs
EPA RSL
(Residential
Soil)
EPA RSL
(Commercial
Soil)
DTSC SL
(Residential
Soil)
DTSC SL
(Commercial
Soil)
Lead -- 400 800 80 320
TPH-d 260 -- -- -- --
Soil
Analyte
mg/kg
GGG
GGG
GG
GG
GGGGGG
GGGGGG
GGGGGG
GGGGGG
GGGGGG
GGGGGG
GGGGGG
GGGGGG
GGGGGG
GGGGGG
GGGGGGGGG
GGGGGGGGG
GGGGGGGGG
GGGGGGGGG
GGGGGGGGG
GGGGGGGGG
GGGGGGGGG
GGGGGGGGG
GGGGGGGGG
GGGGGGGGG
GGGG
GGGG
GGGG
GGGG
!(
!(
!(
#0
#0
&3
&3
&3
")
")
")
Groundwater
Flow Direction
Former
Service
Bays
Former
Office
905-GW-4-S-03032021
TPH-g: 800 mg/kg
905-GW-4-03152021
TPH-g: 480 ug/L
905-GW-1-03032021
TPH-g: 13 μg/L 905-GW-3-03032021
TPH-g: 12 μg/L
Source: ESRI, ArcGIS Online, World Imagery, 2018
P:\EPA_REPA6_Brownfields\PROJECT MANAGEMENT\GIS\GIS\MapFiles\TO13_Fig11_SouthSF_905_Exceedances.mxd Figure 11
Sampling Results Exceeding Screening
Levels - 905 Linden Avenue
Date: 6/11/2021 Drawn By: Elaia McDonald Project No: 103Z65210007M South San Francisco- Linden & Cypress Aves
Targeted Brownfields Assessment
South San Francisco, California
Legend
!( SampleType
#0 Former Hoist
&3 Former UST Fill Covers
") Electric Vault
?@ Former Groundwater Wells1
Former Inlet Pipe
Groundwater Flow Direction2
GGG
GGG Former Oil Water Separator
Excavation (Depth 8 ft bgs)
GGG
GGG Former Piping Location and
Pump Island Excavation (1998)
(Depth 7 ft bgs)
GGG UST Excavation (1998) (Depth
12 ft bgs)
GG
GG Former Hoist Excavation
(Depth 8 ft bgs)
Former Waste Oil UST
Excavation (Depth 6 ft bgs)
Former 4,000-Gallon UST -
Diesel
Former 6,000-Gallon UST -
Leaded Gasoline
Former 8,000-Gallon UST -
Unleaded Gasoline
Former Buildings
Apparent Backfilled Excavation
Detected with GPR
Approximate Site Boundary
Analyte
RWQCB Tier
1 ESLs
(mg/kg)
TPH-g 100
Soil (mg/kg)
Analyte RWQCB Tier
1 ESLs
EPA VISLs
(Residential)
EPA VISLs
(Commerical)
TPH-g 100 10.4 43.7
Groundwater (ug/L)
±
0 20 40
Feet
Notes:
Site locations are approximate except for monitoring wells MW-1 through MW-6 and the backfilled excavation, which
were surveyed.
1 Removed
2 Based on historical groundwater investigation data.
ug/L
ESL
ft bgs
GPR
mg/kg
RWQCB
TPH-g
UST
Micrograms per liter
Environmental screening level
Feet below ground surface
Ground-penetrating radar
Milligrams per kilogram
San Francisco Bay Regional Water
Quality Control Board
Total petroleum hydrocarbons - gasoline range
Underground storage tank
Inhalation භභ
Dermal Absorption ᶊᶊ
Incidental Ingestion ᶊᶊ
Inhalation ᶊᶊ
Dermal Absorption භභ
Incidental Ingestion ᶊ ᶊ
Notes:
(a) All possible human receptors may be present at the Site in the future. (b)
bgs Below ground surface
භ Potentially complete exposure pathway
Incomplete or negligible exposure pathway
TPH-d Total petroleum hydrocarbons as diesel
Former Underground
Storage Tanks Spill and leaks Subsurface Soil (5 feet bgs) TPH-d
EXPOSURE
ROUTE
Former Underground
Storage Tanks 1,2-dichloroethane,
benzene,
ethylbenzene, m,pxylene, o-xylene,
toluene
PRIMARY
SOURCE CONTAMINANTS
South San Francisco - Linden & Cypress Aves
Targeted Brownfields Assessment
South San Francisco, California
Figure 12
Conceptual Site Model - 616 Linden Avenue
Spill and leaks
POTENTIAL HUMAN RECEPTORS(a)
Future
Unrestricted Use
(Residential)
Future Restricted
Use (Commercial /
Construction
Workers)
Subsurface Soil
Gas
(5 feet bgs) b
PRIMARY
RELEASE
MECHANISM
SECONDARY
SOURCE
Soil gas is a tertiary source - contaminants must first be released to soil and/or groundwater, which act as secondary sources that release to soil gas and then soil gas is released into indoor air.
ᶊ
Inhalation ᶊᶊ
Dermal Absorption භභ
Incidental Ingestion භභ
Inhalation භභ
Dermal Absorption භභ
Incidental Ingestion ᶊᶊ
Notes:
(a) All possible human receptors may be present at the Site in the future. bgs Below ground surface
භ Potentially complete exposure pathway
ᶊ Incomplete or negligible exposure pathway
TPH-g Total petroleum hydrocarbons as gasoline
South San Francisco - Linden & Cypress Aves
Targeted Brownfields Assessment
South San Francisco, California
Figure 13
Conceptual Site Model - 905 Linden Avenue
Spills and leaks
POTENTIAL HUMAN RECEPTORS(a)
Future
Unrestricted Use
(Residential)
Future Resticted
Use (Commercial /
Construction
Workers)
PRIMARY
SOURCE CONTAMINANTS
PRIMARY
RELEASE
MECHANISM
SECONDARY
SOURCE
EXPOSURE
ROUTE
Former Service Bays TPH-g Spills and leaks Subsurface Soil (5 feet bgs)
Former Service Bays TPH-g Groundwater
(5 feet bgs)
TABLES