Inset #6 Centennial Trail Active Transportation Safety and Rehabilitation Upgrade milepost signs
Add doggie bag
dispensers
Inset #1 Inset #1 Inset #2
Inset #3 Inset #4
Inset #5 Inset #6
SCALE: 1-1/2" = 1'-0" 1 ASPHALT PAVING (PEDESTRIAN) 2"
NOTE: 1. HAND TRIM EDGE, ±1" MAXIMUM DEFLECTION OVER 10' NEW ASPHALT, SEE SPECS. HOLD FINISH GRADE 1/2" BELOW PAVING COMPACTED CLASS 2 AGGREGATE BASE, SEE SPECS.
COMPACTED SUBGRADE, SEE SPECS. 6"
LANDSCAPE EDGING, SEE SPECS
2 L3.00 STABILIZED DECOMPOSED GRANITE PAVING, TYP.
LANDSCAPE EDGING, SEE SPECS
COMPACTED SUBGRADE, SEE SPECS. COMPACTED CLASS 2 AGGREGATE BASE, SEE SPECS. STABILIZED DECOMPOSED GRANITE, SEE SPECS.
LANDSCAPE EDGING, SEE SPECS. FINISH GRADE, SEE PLANS
SCALE: 1-1/2" = 1'-0" 2 STABILIZED DECOMPOSED GRANITE PAVING 4" 6" NOTES: 1. MEDIUM BROOM FINISH, UNLESS OTHERWISE NOTED ON PLANS. 2. PROVIDE SCORE JOINTS (SJ) AND EXPANSION JOINTS (EJ) AS SHOWN ON PLAN. 3. PROVIDE (EJ) MAX. 18' O.C. BOTH DIRECTIONS, ADJACENT TO BUILDINGS, WALLS, AND OTHER VERTICAL ELEMENTS, UNLESS OTHERWISE NOTED ON PLANS.
COMPACTED SUBGRADE CLASS 2 AGGREGATE BASE, 95%
COMPACTED, MIN. P.I.P. CONCRETE PAVING, SEE SPECS. CONCRETE SLAB WITH #4 REBAR 12" O.C. BOTH WAYS HOLD FINISH GRADE 1/2" BELOW PAVING
EASE EXPOSED EDGES
SCORE JOINT (SJ) EXPANSION JOINT (EJ)
SCALE: 1-1/2" = 1'-0" 4 PEDESTRIAN CONCRETE
SECTION 5" 5" 3" CLR 3" CLR
SCALE: 1/4" = 1'-0" 3 CROSS SECTION THROUGH BAY TRAIL
3'-0" TYP. 12'-0" 3'-0" TYP.
2 L3.00 STABILIZED DECOMPOSED GRANITE PAVING, TYP. 1
L3.00 ASPHALT PAVING
(PEDESTRIAN) EXISTING GRADE 2'-0"
COMPACTED SUBGRADE, SEE SPECS CLAY CAP, SEE GEOTECH REPORT
BAY EDGE
5 L3.00 CONCRETE COVER PLATE EDGING, TYP. SLOPE 1.5% MAX SCALE: 3/4" = 1'-0" 3 DOG BAG DISPENSER
DOG WASTE BAG BOX
STEEL POST
FINISHED GRADE CONCRETE FOOTING, S.S.D.
3" BARK MULCH 6'-1" 3'-8"
10" MAX.