E GRAND AVE
SYLVESTER RD
POLETTI WAY E GRAND AVE 11' 12' 12' 12' 6' 4'5' 10' 11' 12' 6' 4' 8' GRAND AVE 6' 6'
6'
12'
5'
11' 12' 10'
3'
8' 6'
11'
11' 11' 11'
8'
3'
5'
POLETTI WAY 12'12' 11' 11' 11' 11' 11' 11' 11' Caltrain Station Area South San Francisco ATP Cycle 8 Application Figure 1 N.T.S. CONCEPTUAL - NOT FOR CONSTRUCTION. ADDITIONAL DETAILED ANALYSIS AND ENGINEERING DESIGN REQUIRED.
POLETTI WAY
GATEWAY CROSSING "LEFT TURN ONLY" PAVEMENT MARKING
CORPORATE "DO NOT ENTER" MOUNTABLE AREA "DO NOT ENTER"
12' POLETTI WAY
10'
3' Poletti Way South San Francisco ATP Cycle 8 Application Figure 2 N.T.S. CONCEPTUAL - NOT FOR CONSTRUCTION. ADDITIONAL DETAILED ANALYSIS AND ENGINEERING DESIGN REQUIRED. 12' path + 2' buffer+5' buffer Repave and restripe existing trail OYSTER POINT BLVD US-101 OFF RAMP GATEWAY BLVD Path connection Shared lane markings pending coordination with parcel owner Ramp improvements, high visibility markings, and advanced stop bars Poletti Way Trail Connection South San Francisco ATP Cycle 8 Application Figure 3 N.T.S. CONCEPTUAL - NOT FOR CONSTRUCTION. ADDITIONAL DETAILED ANALYSIS AND ENGINEERING DESIGN REQUIRED. 6' 12' 5' FORBES BLVD 11' 12' 10' 8' 3' E GRAND AVE 6'
HARBOR WAY
GATEWAY BLVD 11' 11' 11' 11' 8' 3' 5' 6' 12' 5' 11' 12' 10' 8' 3' 6' 11' 11' 11' 11' 8' 3' 5' 5' 5' 12' 6' 3' 6' 6' 11' 11' 11' 11' 5' 6' 12' 5' 11' 12' 10' 3' 8' 6' 11' 11' 11' 11' 8' 3' 5' Bollards to establish directionality for transition from shared path to separated path Transition to existing sidewalk Existing Bus Stop Existing Bus Stop
ROEBLING RD
E GRAND AVE 5' 5' 5' 5' 12' 6' 3' 6' 6' 11' 11' 11' 11' 5' 5' 12' 6' 3' 6' 6' 11' 11' 11' 11' 5' 4' 5' 12' 6' 6' 3' 6' 11' 11' 11' 12' 5' 4' Bus Stop Bus Stop Maintain existing sidewalk Maintain existing sidewalk Caltrain Station Area South San Francisco ATP Cycle 8 Application Figure 1 CONCEPTUAL - NOT FOR CONSTRUCTION. ADDITIONAL DETAILED ANALYSIS AND ENGINEERING DESIGN REQUIRED.
KIMBALL WAY
LITTLEFIELD AVE
ALLERTON AVE E GRAND AVE Bus Stop Transition to existing sidewalk Bus Stop 11' 6' 11' 2' 6' DNA WAY E GRAND AVE E GRAND AVE Bus Stop 4' 11' 6'6' 2' 6' 11' 12' 11' 11' 4' 6' 2' 8' 4' 11' 6'6' 2' 6' 11' 12' 11' 11' 4' 6' 2' 8' Caltrain Station Area South San Francisco ATP Cycle 8 Application Figure 1 CONCEPTUAL - NOT FOR CONSTRUCTION. ADDITIONAL DETAILED ANALYSIS AND ENGINEERING DESIGN REQUIRED.
HASKINS WAY
E GRAND AVE E GRAND AVE Bus Stop Bus Stop Transition to existing sidewalk Raised intersection with textured pavement or mural Transition to separated bikeway Transition to bike boulevard 5' 6' 6' 11' 3' 2' 6' 11' 5' CONCEPTUAL - NOT FOR CONSTRUCTION. ADDITIONAL DETAILED ANALYSIS AND ENGINEERING DESIGN REQUIRED. E. Grand Avenue Complete Streets Corridor Improvements Figure 4 - E Grand Segment D Plaza with bike amenities connecting to San Francisco Bay Trail SAN FRANCISCO BAY TRAIL CONCEPTUAL - NOT FOR CONSTRUCTION. ADDITIONAL DETAILED ANALYSIS AND ENGINEERING DESIGN REQUIRED. E. Grand Avenue Complete Streets Corridor Improvements Figure 5 - E Grand Segment E