Cities Index.
Gothic Pricing Chart (Original).pdf

South San Francisco City Council
August 12, 2026

Document
Gothic Pricing Chart (Original).pdf
Meeting
August 12, 2026
Body
South San Francisco City Council
Original file
206 KB
Text extracted from the city's file for reading and search. Open the original on ci-ssf-ca.legistar1.com. That file is the official record.

ATTACHMENT A

SERVICE AREAS AND LITTER PICKUP FREQUENCIES
Perform the scope of work for LANDSCAPE MAINTENANCE SERVICES in place, and in accordance with the Service Areas and Litter Pickup Frequencies below, and with the Standard of Services (Attachment C). See key below for notes. In the event of a conflict in or inconsistency between the terms of this Attachment and the Standard of Services (Attachment B), the Standard of Services shall prevail.

BID
ITEM

DESCRIPTION FROM TO LITTER
PICKUP

SERVICE
FREQ.

IRRIG.

TYPE

NOTES MONTHLY
RATE
ANNUAL
COST
1 Callan
Boulevard
Carter Drive Westborough
Boulevard
26 M $503.75 $6,044.94
2 Capay Circle /
Lomitas Ave.

Cuesta Drive Verano Drive 26 M $503.75 $6,044.94
3 Chestnut Avenue El Camino
Real
Mission Road 26 A $143.78 $1,725.30
4 Chestnut Avenue Hillside
Boulevard
Grand
Avenue/Aldengate
Dr.
26 A A $92.66 $1,111.86
5 East Grand
Avenue
Airport
Boulevard
Gateway
Boulevard
26 A B $309.92 $3,718.98
6 El Camino Real
medians &
shoulders
Hickey
Boulevard
Noor Avenue 52 A C $2,534.70 $30,416.40
7 Gellert
Boulevard
King Drive Westborough
Boulevard
26 A $836.03 $10,032.30
8 Gellert
Boulevard
Westborough
Boulevard
Shannon Drive 26 A,M D $445.17 $5,342.04
9 Mission Road Chestnut
Avenue
Oak Avenue 26 A E $407.90 $4,894.74
10 Mitchell Avenue South
Airport
Boulevard
W/O S.P.R.R. 26 M F $124.61 $1,495.26
11 South Airport
Blvd. medians
S.P.R.R.

Underpass
Beacon Street
southern most
intersection
26 N G $105.44 $1,265.22
12 Westborough
Boulevard
Median
800' E/O
Junipero
Serra Blvd.

Olympic Drive 52 A $1,347.23 $16,166.70
13 Westborough
Boulevard
Median
Olympic
Drive
Skyline Boulevard 52 N H $915.90 $10,990.80
14 Westborough
Boulevard
Median
515’ W/O
Camaritas
Avenue
El Camino Real 52 A I $269.45 $3,233.34
15 Elm Court Tamarack
Ln.

Park Way 12 M J $124.61 $1,495.26
16 Forbes
Boulevard
Medians
E. Grand
Ave.

Allerton 26 M $466.47 $5,597.64
17 East Grand Ave.

Medians
Gateway
Blvd.

Littlefield Ave. 26 A,M $288.62 $3,463.38
18 Hillside Blvd. Chestnut
Ave.

Dolores Way 12 A K $92.66 $1,111.86
19 Willow Avenue Dolores Way Estate Ct. 26 A $124.61 $1,495.26 20 Gateway
Boulevard
E. Grand
Ave.

Mitchell Ave. 26 A $429.20 $5,150.34
21 Airport Blvd.
medians,
shoulders and
hook ramps
Sister Cities
Blvd.

Brisbane City
limits
12 A,N $429.20 $5,150.34
22 Airport Blvd.
median,
sidewalks, and
tree wells
Sister Cities
Blvd.

South to S.P.R.R.
underpass
26 A $225.78 $2,709.36
23 Slopes on
Airport Blvd.
2nd Lane
(including
south side)
South Airport
Blvd.
12 N L $364.23 $4,370.76
24 Hillside
Blvd/Sister
Cities Blvd
Lincoln St. Airport Blvd 26 A M $1,749.80 $20,997.54
25 Industrial Way 101 Grand
Ave Exit
Planted area at
end of Industrial
Way
26 N N $843.48 $10,121.76
26 Hillside Blvd. N. Slope at
end of
school fence
East to backflow
control valve
12 N $227.91 $2,734.92
27 Randolph Ave
slope/valley
gutter
Highland
Ave.

Airport Blvd. 12 A,N O $250.28 $3,003.30
28 Beech St.
median
Spruce Ave. Larch Ave. 12 N P $53.25 $639.00
29 Spruce Ave.
median
Maple Ave. Park Way 12 N Q $107.57 $1,290.78
30 Hickey Blvd. El Camino
Real
Daly City limits 12 A R $92.66 $1,111.86
31 Oyster Pt. Blvd.
median
Airport Blvd. Marina Blvd. 26 A $639.00 $7,668.00
32 Jack Drago Park E. Grand
Ave.

Gateway
Boulevard
26 A S $404.70 $4,856.40
33 “Gus' Islands”
on Airport Blvd.

Grand Ave. Miller Ave. 26 A $248.15 $2,977.74
34 Centennial Way
/ Trail
San Bruno
BART
South San
Francisco BART
26 A, N T $8,438.00 $101,255.94
35 Junipero Serra Hwy-280
Avalon
entrance
SSF Sign approx..
90’ Northwest of
Hickey Island
12 N U $316.31 $3,795.66
36 Gull Drive Oyster Point
Blvd
End of culvert
approximately
220’ before
Forbes Blvd
2 N V $78.81 $945.72
37 Appian Way
Median
Westborough
Boulevard
Shannon Dr. 12 A $830.70 $9,968.40
38 SSF Drive
Shoulder
Mandalay
Place
120’ before
Woods Circle
4 N W $140.58 $1,686.96
39 East Grand Ave
Medians
Allerton
Avenue
DNA Way 26 A & N X $348.26 $4,179.06
40 Oyster Point
Landscaping
Oyster Point
Blvd
Beach and Harbor
Master Spit
2 A Y $1,361.07 $16,332.84
41 Hickey and
Longford
Corners/Slopes
Longford
Drive
Overpass 4 N $85.20 $1,022.40
42 Alta Loma
Walkway
Alta Loma
Drive
Crown Circle 4 N $85.20 $1,022.40
43 N. Canal & S.

Canal Shoulder
Walls
Linden Ave Across from 550
N. Canal Street
12 N $368.62 $4,423.41
44 Hillside Blvd &
Linden Ave
Hillside Blvd Linden Ave 12 N $482.45 $5,789.34
45 Olympic
Greenspot
Olympic
Drive
Dublin Drive 12 A $184.85 $2,218.22
46 Sister Cities Park Orange Ave Spruce Ave 26 A $1,548.48 $18,581.74 47 Irish Town
Greens
Linden Ave Airport Blvd 52 A $1,116.12 $13,393.44
48 Sculpture
Garden
Tennis Drive Eucalyptus Ave 52 A Z $1,082.75 $12,993.04 49 BART Plaza El Camino
Real
BART Station
Drop Area
52 A AA $479.25 $5,751.00
50 WQCP 195 Belle Air
Road
4 A & N BB $1,278.00 $15,336.00
51 Pump Station 2 Gateway
Blvd
Oyster Point Blvd 4 N $69.23 $830.70
52 Pump Station 3 Kimball Way Swift Ave 4 N $85.20 $1,022.40 53 Pump Station 4 Harbor Way Mitchell Ave 4 N $127.80 $1,533.60 54 Pump Station 5 S. Airport
Blvd
Belle Air Road 4 N $85.20 $1,022.40
55 Pump Station 6 160 Utah
Ave
4 N $69.23 $830.70
56 Pump Station 7 220
Littlefield
Ave
4 N $69.23 $830.70
57 Pump Station 8 701 Forbes
Blvd
4 N $127.80 $1,533.60
58 Pump Station 9 1479 San
Mateo Ave
4 N $127.80 $1,533.60
59 Pump Station 10 572 Forbes
Blvd
4 N $69.23 $830.70
60 Pump Station 11 235 Shaw
Road
4 N $127.80 $1,533.60
61 Pump Station 14 1191
Veterans
Blvd
4 N $85.20 $1,022.40
62 Stormwater
Station 5
27 S. Linden
Ave
4 N $266.25 $3,195.00
TOTAL BID PRICE $35,236.94 $422,843.30
Key to Service Area Notes:

Service Frequency: Minimum frequency of litter removal. 2 Biannual Service (2 times per year)
4 Quarterly Service (4 times per year)
12 Monthly Service (12 times per year)
26 Bi-weekly Service (26 times per year)
52 Weekly Service (52 times per year)
Irrigation Type: Type of control system.

A Automatic.

Irrigation schedule shall be coordinated with the City.

M Manual.

Contractor shall be responsible for turning system on and off as required for proper irrigation.

N No irrigation system.

City will provide water wagon service as requested by contractor.

Other Notes:

A. Side median landscaping on west side (adjacent to subdivision boundary wall) from Hillside to Livingston Place to Street Light #3550; side median landscaping on east side (adjacent to subdivision boundary wall) from easement gate (near Street Light #4234) to Treeside Court to Street Light #4230; west roadside landscaping from Street Light #4229 to Grand Avenue (adjacent to subdivision boundary wall), which continues along Grand Avenue to Aldengate and includes both east and west roadside landscapes at the Aldengate entrance. Includes eastern hillside from Sunset Ave to Hillside Blvd from roadside to header board below homes.

B. Area includes median islands and roadside landscaping; includes “bomanite” concrete side median along Dubuque which extends along E. Grand Avenue for 200 feet. (area is adjacent to 101 highway boundary fence)
C. Area includes median islands, intersection islands at Hickey Blvd., and weed abatement along a 10’ wide easement from shopping center driveway on west side of El Camino Real extending 525’ to grey retaining wall; west side of El Camino Real from El Camino Real staircase across from Bart Way to Arroyo Drive, including triangular area between El Camino Real and Del Paso Drive. Also includes west side shoulder from Brentwood to San Bruno City limits (along wooden retaining wall).

Also includes planters and bioswales on northeast side of road extending from BART Drive to Arroyo Drive.

D. Area includes median islands plus roadside landscaping on east side, adjacent to subdivision boundary wall.

E. Area includes median islands and park-like area between Mission Rd. and Colma Creek including shrubs extending to Mission Road entrance of Centennial Trail.

F. Roadside landscaping adjacent to Colma Creek as well as medians at South Airport Blvd.

G. Area includes median and hardscape islands and intersection islands at Produce and San Mateo Avenues.

H. Area includes median islands as well as shoulders on southern side of Westborough Blvd from Oakmont Drive to Olympic Drive
I. Area includes median landscaping from end of guard rail west of Camaritas Avenue to El Camino Real. Also includes two (2) triangular islands on north side of Westborough Blvd. at Camaritas Avenue.

J. Includes median on Elm Court as well as easement extending from Elm Court to Palm Ave. Between addresses 505 and 509 on Elm Court; 569 and 573 on Palm Ave.

K. Area includes roadside landscaping on south side adjacent to subdivision boundary wall.

L. Area contains slope on west side of Airport Blvd from 2nd Lane to S.P.R.R. underpass also contains walk way between Village way and Airport Blvd; includes slope on south side of Airport Blvd from S.P.R.R. underpass to South Airport Blvd. Maintenance includes weeds in sidewalks on both sides.

M. Area includes center and side medians for entirety of road from Lincoln Blvd. to Airport Blvd.

Includes an 8’ easement on north shoulder from Airport Blvd to SSF Drive past bus stop across from Jefferson Street. Includes weed abatement and shrub clearance adjacent to sidewalks and roadway.

Includes median on SSF Drive between Sister Cities Blvd and Mandalay Place N. Area includes full length of Industrial Way from Grand Ave to end of road at parking lot. Includes land on northwest side of road between railroad fence and curb, as well as southeast side of road approximately 10’ into landscaping as measured from curb edge.

O. Area includes upslope towards Sister Cities Blvd guard rail and sound wall to keep valley gutter clear; includes round-about landscape area at the corner of Sister Cities and Airport Blvd; requires weed abatement 3 times per year and/or additional as requested for fire prevention. Larger debris removal required as needed throughout this area.

P. Entire median extending from Spruce Ave to Larch Ave.

Q. Two (2) ivy covered medians between Maple Ave and Park way R. Area includes center median islands from Hilton Ave. to Daly City border, as well as two porkchops at intersection of Hickey and Junipero Serra. Includes south side of road from Crown Circle to Junipero Serra as well as north side of road from Hilton Ave through bend till backflow along Junipero Serra Blvd. Areas extend from road edge to residents back fence S. Large park like area on E. Grand Ave. between Grand Ave and Gateway Blvd. Includes small “pork chop” island at Grand Ave and E. Grand Ave.

T. Area excludes the new park between Spruce Ave and Huntington Ave, the Civic Campus frontage on Civic Campus Drive, and a considerable portion of the large space off Mission Road Ave. All other plazas, pathways, and adjacent open space are part of this scope.

U. Area includes east and west sides of road extending to resident’s fence line where brush does not impeded access. Also includes median islands at JS & King Drive, all hardscape island tips, small concrete islands on east side of JS at Westborough. Includes all median islands and corners at Avalon Drive and JS as well as medians on Avalon Drive from Valverde Drive to Waverly Court. Also includes east side of off-ramp from Avalon Drive to end of turn out area. Weed abatement required in this area 2-3 times per year. Application of herbicide and pre-emergent is required for these areas.

V. Weed abatement and litter pick up on west side of road from end of culvert, north to Oyster Point Blvd. Area extends to top of ridge and clearance around vent tubes at top of hill.

W. Area includes median island between Sister Cities Blvd and SSF Drive near Mandalay Place.

X. Medians on East Grand. Item number also includes two medians on East Jamie Court and trash pickup at end of Jamie Court.

Y. Site includes medians and shoulders on Oyster Point Blvd starting at Gull Drive, extending down the road to the north till end of the beach and south to the Harbor Master Building on the spit. Work includes a bi-annual cutting of all grasses, weeding, and dead heading. Site includes one annual mowing of the large hill to the east of 352 Oyster Point Blvd.

Z. Scope includes pressure washing all pathways every six (6) months.

AA. Scope includes pressure washing every six (6) months of the entire plaza area.

BB. Areas around retention pond are to be serviced two (2) times per year and weed abatement work shall not be conducted in that area during nesting season which is March through September.

← All documents from this meeting