Cities Index.
Agenda

St. Helena City Council
June 26, 2023

Document
Agenda
Meeting
June 26, 2023
Body
St. Helena City Council
Pages
4,069
Original file
320.0 MB
Text extracted from the city's file for reading and search. Open the original on sthelenaca.api.civicclerk.com. That file is the official record.

... and in his response to that letter, Professional Engineer Gerald R. Giorgi expressly alerted the landowner that he should "count on being sued" should another flood occur and neighbors be damaged, for "whatever reason" ...

Agenda Item #6.3.

Page 1779 of 4069 ends

It is unfortunate the General Plan guidelines the professional engineers recommendations were ignored, but when Measure A was passed in 1998, residents of Vineyard Valley, fearing the future flood warned by engineer Giorgi, fought assertively to have their flood protection upgraded to avoid the next damaging flood. Vineyard Valley residents were comforted by the inclusion of this Measure A set-aside to fund flood protection for St. Helena ...

In December 2008, residents sought to preserve the floodplain by suggesting this upgrade to Agenda Item #6.3.

Page 1780 of 4069 ends

the extant cinder block wall erected after Vineyard Valley's flood in 1986 to flood standard, along Vineyard Valley's north property line ...

Unfortunately the residents were ignored and the levee alignment now cordons off a major component of the natural floodplain, with obvious flood risk increases by obstructing the floodplain.

The residents proposed the remaining floodplain be preserved as a public riverbank park, but advocates of the ill-designed levee across the floodplain won the argument and Vineyard Valley flood protection was approved across the very floodplain that had flooded Vineyard Valley so badly in 1986 and 1995.

When Vineyard Valley residents asked why the levee had to obstruct the floodplain instead of upgrading the cinder block wall along their north property line, and they were told upgraded floodwall around Vineyard Valley and Hunter's Grove "would not work." As an engineer myself, I can only conclude the levee alignment was built across the floodplain to protect developer Hunter's property at public expense, and the sacrifice of a large portion of the historic floodplain.

UC Davis Engineering Professor Nicholas Pinter wrote after completing a site inspection that he found our levee a "field of dreams levee" as he wrote in this report. City management may want to inquire of Professor Pinter as to his opinion of the wisdom of permitting housing development behind the levee.

I personally trust Professor Pinter significantly than I trust the engineers who dangerously aligned our levee right through the middle of our floodplain.

Thank you for your consideration.

Wendell Laidley
Agenda Item #6.3.

Page 1781 of 4069 ends

st. Helena
Agenda Item #6.3.

Page 1782 of 4069 ends

From: David Wilkinson
To: Cindy Tzafopoulos
Cc: Noah Housh; Mark Prestwich
Subject: Hunter Project-ERI Scoping Input
Date: Thursday, April 12, 2018 4:11:07 PM
To the City Clerk, St. Helena, et al,
This note is a submission in response to the request for input on the Hunter Property Development EIR scoping exercise.

As you may be aware my home is located somewhat at ground zero of this proposed development and the results of the EIR impacts me very directly and those of my immediate neighbors and the greater St. Helena community dramatically. The EIR, which seems to be evolving with considerable thought, does seem to be predicated on some larger issues that are being relegated to past decisions that do not appear to be as well thought out and that is concerning to me, substantially.

I am relatively new to the community and while attempting to discover what has been a very long process in developing this property there are more questions raised than answered. I would consider myself pro-development but with the caveat that any development is very well thought out, vetted intensely, and evolved with the best practices for the whole community/City in its considerations and approvals. I am pro-development, and not a developer. But I know instinctively when something is not of the potential standard that the community needs and deserves. The very few illustrations of this development that I have seen are of the poorest creative quality that I could imagine and certainly do not seem to fit any, even minimal, urban plan for our City although I have made some efforts to discover what that may actually entail. As I stated in one of the public meetings I am somewhat baffled by the rush to move a poorly defined project forward without much more discovery.

These comments are somewhat outside the bounds of the Scoping Request but the Discovery process is directly related to that Request. I have heard of my neighbors concerns, and they are ground zero concerns, and whole community concerns of mine as well in relation to traffic, water, resources, noise, costs, liability, and impact on every aspect of the future of this City that I am quickly coming to value and appreciate deeply.

Somewhat disconcerting is the revelation that a previous EIR contained information which is to be transported into the new EIR without review. I am particularly concerned with the whole process of developing the levee and its viability particularly relative to the news of so many levees and similar structures in Houston, New Orleans and elsewhere failing when they were supposed to be certified ‘100 year flood’ capable. If this levee fails who is responsible for the destruction that will devastate so many in this community? Who pays for those types of catastrophes? I would ask that this issue not be swept under the proverbial rug and be added, Agenda Item #6.3.

Page 1783 of 4069 ends

in-depth, to the scope of the EIR work.

My thanks for your work and the commitment from every one of our councilors, City Staff and Executive and Counsel, the Mayor and all of those tasked with this EIR work and they all contribute to our future which is bright indeed.

David G. Wilkinson
704 Hunt Avenue
St. Helena, CA.
94574

1.415.608.5790
[email protected]
Agenda Item #6.3.

Page 1784 of 4069 ends

Agenda Item #6.3.

Page 1785 of 4069 ends

Agenda Item #6.3.

Page 1786 of 4069 ends

Agenda Item #6.3.

Page 1787 of 4069 ends

Agenda Item #6.3.

Page 1788 of 4069 ends

Agenda Item #6.3.

Page 1789 of 4069 ends

Agenda Item #6.3.

Page 1790 of 4069 ends

Agenda Item #6.3.

Page 1791 of 4069 ends

Agenda Item #6.3.

Page 1792 of 4069 ends

Agenda Item #6.3.

Page 1793 of 4069 ends

Agenda Item #6.3.

Page 1794 of 4069 ends

Agenda Item #6.3.

Page 1795 of 4069 ends

Agenda Item #6.3.

Page 1796 of 4069 ends

Agenda Item #6.3.

Page 1797 of 4069 ends

Agenda Item #6.3.

Page 1798 of 4069 ends

Agenda Item #6.3.

Page 1799 of 4069 ends

Agenda Item #6.3.

Page 1800 of 4069 ends

Agenda Item #6.3.

Page 1801 of 4069 ends

Agenda Item #6.3.

Page 1802 of 4069 ends

Agenda Item #6.3.

Page 1803 of 4069 ends

Agenda Item #6.3.

Page 1804 of 4069 ends

Agenda Item #6.3.

Page 1805 of 4069 ends

Agenda Item #6.3.

Page 1806 of 4069 ends

Agenda Item #6.3.

Page 1807 of 4069 ends

Agenda Item #6.3.

Page 1808 of 4069 ends

Agenda Item #6.3.

Page 1809 of 4069 ends

Agenda Item #6.3.

Page 1810 of 4069 ends

Agenda Item #6.3.

Page 1811 of 4069 ends

Agenda Item #6.3.

Page 1812 of 4069 ends

Agenda Item #6.3.

Page 1813 of 4069 ends

Agenda Item #6.3.

Page 1814 of 4069 ends

Agenda Item #6.3.

Page 1815 of 4069 ends

Agenda Item #6.3.

Page 1816 of 4069 ends

Agenda Item #6.3.

Page 1817 of 4069 ends

Agenda Item #6.3.

Page 1818 of 4069 ends

Agenda Item #6.3.

Page 1819 of 4069 ends

Agenda Item #6.3.

Page 1820 of 4069 ends

Agenda Item #6.3.

Page 1821 of 4069 ends

Agenda Item #6.3.

Page 1822 of 4069 ends

Agenda Item #6.3.

Page 1823 of 4069 ends

Agenda Item #6.3.

Page 1824 of 4069 ends

Agenda Item #6.3.

Page 1825 of 4069 ends

Agenda Item #6.3.

Page 1826 of 4069 ends

Agenda Item #6.3.

Page 1827 of 4069 ends

Agenda Item #6.3.

Page 1828 of 4069 ends

Agenda Item #6.3.

Page 1829 of 4069 ends

Agenda Item #6.3.

Page 1830 of 4069 ends

Agenda Item #6.3.

Page 1831 of 4069 ends

Agenda Item #6.3.

Page 1832 of 4069 ends

Agenda Item #6.3.

Page 1833 of 4069 ends

Agenda Item #6.3.

Page 1834 of 4069 ends

Agenda Item #6.3.

Page 1835 of 4069 ends

Agenda Item #6.3.

Page 1836 of 4069 ends

Agenda Item #6.3.

Page 1837 of 4069 ends

Agenda Item #6.3.

Page 1838 of 4069 ends

Agenda Item #6.3.

Page 1839 of 4069 ends

Agenda Item #6.3.

Page 1840 of 4069 ends

Agenda Item #6.3.

Page 1841 of 4069 ends

Agenda Item #6.3.

Page 1842 of 4069 ends

Agenda Item #6.3.

Page 1843 of 4069 ends

Agenda Item #6.3.

Page 1844 of 4069 ends

Agenda Item #6.3.

Page 1845 of 4069 ends

Agenda Item #6.3.

Page 1846 of 4069 ends

Agenda Item #6.3.

Page 1847 of 4069 ends

Agenda Item #6.3.

Page 1848 of 4069 ends

Agenda Item #6.3.

Page 1849 of 4069 ends

Agenda Item #6.3.

Page 1850 of 4069 ends

Agenda Item #6.3.

Page 1851 of 4069 ends

Agenda Item #6.3.

Page 1852 of 4069 ends

Agenda Item #6.3.

Page 1853 of 4069 ends

Agenda Item #6.3.

Page 1854 of 4069 ends

Agenda Item #6.3.

Page 1855 of 4069 ends

Agenda Item #6.3.

Page 1856 of 4069 ends

Agenda Item #6.3.

Page 1857 of 4069 ends

Agenda Item #6.3.

Page 1858 of 4069 ends

Agenda Item #6.3.

Page 1859 of 4069 ends

Agenda Item #6.3.

Page 1860 of 4069 ends

Agenda Item #6.3.

Page 1861 of 4069 ends

Agenda Item #6.3.

Page 1862 of 4069 ends

Agenda Item #6.3.

Page 1863 of 4069 ends

Agenda Item #6.3.

Page 1864 of 4069 ends

Agenda Item #6.3.

Page 1865 of 4069 ends

Agenda Item #6.3.

Page 1866 of 4069 ends

Agenda Item #6.3.

Page 1867 of 4069 ends

Agenda Item #6.3.

Page 1868 of 4069 ends

1-A
Appendix A. California Agricultural LESA Worksheets
Calculation of the Land Evaluation (LE) Score
NOTES Part 1. Land Capability Classification (LCC) Score:
(1) Determine the total acreage of the project. (2) Determine the soil types within the project area and enter them in Column A of the Land Evaluation Worksheet provided on page 2-A. (3) Calculate the total acres of each soil type and enter the amounts in Column B. (4) Divide the acres of each soil type (Column B) by the total acreage to determine the proportion of each soil type present. Enter the proportion of each soil type in Column C. (5) Determine the LCC for each soil type from the applicable Soil Survey and enter it in Column D. (6) From the LCC Scoring Table below, determine the point rating corresponding to the LCC for each soil type and enter it in Column E.

LCC Scoring Table
LCC Class
I IIe IIs,w IIIe IIIs,w IVe IVs,w V VI VII VIII
Points 100 90 80 70 60 50 40 30 20 10 0
(7) Multiply the proportion of each soil type (Column C) by the point score (Column E) and enter the resulting scores in Column F. (8) Sum the LCC scores in Column F. (9) Enter the LCC score in box <1> of the Final LESA Score Sheet on page 10-A.

Part 2. Storie Index Score:
(1) Determine the Storie Index rating for each soil type and enter it in Column G. (2) Multiply the proportion of each soil type (Column C) by the Storie Index rating (Column G) and enter the scores in Column H. (3) Sum the Storie Index scores in Column H to gain the Storie Index Score. (4) Enter the Storie Index Score in box <2> of the Final LESA Score Sheet on page 10-A.

Page 1869 of 4069 ends

Agenda Item #6.4.
2-A
Land Evaluation Worksheet Site Assessment Worksheet 1.

Land Capability Classification (LCC)
Project Size Score
and Storie Index Scores

A B C D E F G H I J K
Soil Map Project Proportion
of
LCC LCC LCC Storie Storie
Index
LCC Class LCC
Class
LCC
Class
Unit Acres Project Area Rating Score Index Score I - II III IV - VIII (Must Sum LCC Storie Index
Totals to 1.0) Total
Score
Total Score Total Acres
Project Size
Scores
Highest Project
Size Score
104105
118124

3.596

8.588

3.394

0.56616.14

0.22 0.53

0.210.04
IIw-2
IIw-2
IIw-2IVs-4
808080
40 17.84

42.56 16.8

1.4 78.6 61.14

3.596

8.588

3.394

0.566

10.578
30 0.566
0 30
63 587046

13.86 30.74

14.7 1.84

Page 1870 of 4069 ends

Agenda Item #6.4.
3-A
LESA Worksheet (cont.) Calculation of the Site Assessment (SA) ScoreNOTES Part 1. Project Size Score:.
(1) Using Site Assessment Worksheet 1 provided on page 2-A, enter the acreage of each soil type from Column B in the Column - I, J or K - that corresponds to the LCC for that soil. (Note: While the Project Size Score is a component of the Site Assessment calculations, the score sheet is an extension of data collected in the Land Evaluation Worksheet, and is therefore displayed beside it).(2) Sum Column I to determine the total amount of class I and II soils on the project site. (3) Sum Column J to determine the total amount of class III soils on the project site. (4) Sum Column K to determine the total amount of class IV and lower soils on the project site.(5) Compare the total score for each LCC group in the Project Size Scoring Table below and determine which group receives the highest score.

Project Size Scoring Table
Class I or II Class III Class IV or Lower
Acreage Points Acreage Points Acreage Points
>80 100 >160 100 >320 100
60-79 90 120-159 90 240-319 8040-59 80 80-119 80 160-239 6020-39 50 60-79 70 100-159 4010-19 30 40-59 60 40-99 20 10<
0 20-39 30 40<
0 10-19 10
10<
0 (6) Enter the Project Size Score (the highest score from the three LCC categories) in box <3> of the Final LESA Score Sheet on page 10-A.

Page 1871 of 4069 ends

Agenda Item #6.4.
4-A
LESA Worksheet (cont.) Part 2. Water Resource Availability Score:

NOTES
(1) Determine the type(s) of irrigation present on the project site, including a determination of whether there is dryland agricultural activity as well. (2) Divide the site into portions according to the type or types of irrigation or dryland cropping that is available in each portion. Enter this information in Column B of Site Assessment Worksheet 2. - Water Resources Availability. (3) Determine the proportion of the total site represented for each portion identified, and enter this information in Column C. (4) Using the Water Resources Availability Scoring Table, identify the option that is most applicable for each portion, based upon the feasibility of irrigation in drought and non-drought years, and whether physical or economic restrictions are likely to exist. Enter the applicable Water Resource Availability Score into Column D. (5) Multiply the Water Resource Availability Score for each portion by the proportion of the project area it represents to determine the weighted score for each portion in Column E. (6) Sum the scores for all portions to determine the project’s total Water Resources Availability Score (7) Enter the Water Resource Availability Score in box <4> of the Final LESA Score Sheet on page 10-A.

Page 1872 of 4069 ends

Agenda Item #6.4.
5-A
Site Assessment Worksheet 2. - Water Resources Availability A
B
C
D
E
Water Weighted
Project Water Proportion of Availability Availability
Portion Source Project Area Score Score
(C x D)
123456
(Must Sum Total Water
to 1.0) Resource
Score
On-site well 0.4 100 40
Not irrigated 0.6
2 0 12
52

Page 1873 of 4069 ends

Agenda Item #6.4.
6-A
Water Resource Availability Scoring Table
Non-Drought Years Drought Years
WATER

RESTRICTIONS RESTRICTIONS
Option RESOURCE
Irrigated Physical Economic Irrigated Physical Economic Production Restrictions Restrictions Production Restrictions Restrictions SCORE Feasible? ? ? Feasible? ? ? 1 YES NO NO YES NO NO 1002 YES NO NO YES NO YES 953 YES NO YES YES NO YES 904 YES NO NO YES YES NO 855 YES NO NO YES YES YES 806 YES YES NO YES YES NO 757 YES YES YES YES YES YES 658 YES NO NO NO -- -- -- -- 50 9 YES NO YES NO -- -- -- -- 45 10 YES YES NO NO -- -- -- -- 35 11 YES YES YES NO -- -- -- -- 30 12 Irrigated production not feasible, but rainfall adequate for dryland 25 production in both drought and non-drought years
13 Irrigated production not feasible, but rainfall adequate for dryland 20 production in non-drought years (but not in drought years) 14 Neither irrigated nor dryland production feasible 0

Page 1874 of 4069 ends

Agenda Item #6.4.
7-A
LESA Worksheet (cont.) Part 3. Surrounding Agricultural Land Use Score:

NOTES
(1) Calculate the project’s Zone of Influence (ZOI) as follows:
(a) a rectangle is drawn around the project such that the rectangle is the smallest that can completely encompass the project area. (b) a second rectangle is then drawn which extends one quarter mile on all sides beyond the first rectangle.
(c) The ZOI includes all parcels that are contained within or are intersected by the second rectangle, less the area of the project itself.
(2) Sum the area of all parcels to determine the total acreage of the ZOI. (3) Determine which parcels are in agricultural use and sum the areas of these parcels (4) Divide the area in agriculture found in step (3) by the total area of the ZOI found in step (2) to determine the percent of the ZOI that is in agricultural use. (5) Determine the Surrounding Agricultural Land Score utilizing the Surrounding Agricultural Land Scoring Table below.

Surrounding Agricultural Land Scoring Table
Percent of ZOI
in
Surrounding
Agricultural
Agriculture Land Score
90-100 100
80-89 9075-79 8070-74 7065-69 6060-64 5055-59 4050-54 3045-49 2040-44 10 <40
0 (5) Enter the Surrounding Agricultural Land Score in box <5> of the Final LESA Score Sheet on page 10-A.

Page 1875 of 4069 ends

Agenda Item #6.4.
8-A
Site Assessment Worksheet 3. Surrounding Agricultural Land and Surrounding Protected Resource Land

A B C D
E
F
G
Zone of Influence
Surrounding
Total Acres Acres in Acres of Percent in Percent Surrounding Protected Agriculture Protected Agriculture Protected Agricultural Resource Resource Resource Land Land Score Land Score
Land (A/B) (A/C) (From Table) (From Table)
418.5 178.34 86.96 42.96 20.78 10
0

Page 1876 of 4069 ends

Agenda Item #6.4.
9-A
LESA Worksheet (cont.) Part 4. Protected Resource Lands Score:

NOTES
The Protected Resource Lands scoring relies upon the same Zone of Influence information gathered in Part 3, and figures are entered in Site Assessment Worksheet 3, which combines the surrounding agricultural and protected lands calculations. (1) Use the total area of the ZOI calculated in Part 3. for the Surrounding Agricultural Land Use score. (2) Sum the area of those parcels within the ZOI that are protected resource lands, as defined in the California Agricultural LESA Guidelines. (3) Divide the area that is determined to be protected in Step (2) by the total acreage of the ZOI to determine the percentage of the surrounding area that is under resource protection. (4) Determine the Surrounding Protected Resource Land Score utilizing the Surrounding Protected Resource Land Scoring Table below.

Surrounding Protected Resource Land Scoring Table
Percent of ZOI Protected Resource
Protected Land Score
90-100 100
80-89 9075-79 8070-74 7065-69 6060-64 5055-59 4050-54 3045-49 2040-44 10 <40
0 (5) Enter the Protected Resource Land score in box <6> of the Final LESA Score Sheet on page 10-A.

Page 1877 of 4069 ends

Agenda Item #6.4.
10-A
Final LESA Score Sheet
LESA Worksheet (cont.) Calculation of the Final LESA Score:

NOTES
(1) Multiply each factor score by the factor weight to determine the weighted score and enter in Weighted Factor Scores column. (2) Sum the weighted factor scores for the LE factors to determine the total LE score for the project. (3) Sum the weighted factor scores for the SA factors to determine the total SA score for the project. (4) Sum the total LE and SA scores to determine the Final LESA Score for the project.

Factor
Scores
Factor
Weight
Weighted
Factor
Scores
LE Factors
Land Capability
Classification
<1> 0.25
Storie
Index
<2> 0.25
LE
Subtotal

0.50 SA Factors
Project
Size
<3> 0.15
Water Resource
Availability
<4> 0.15
Surrounding
Agricultural Land
<5> 0.15
Protected
Resource Land
<6> 0.05
SA
Subtotal

0.50 Final LESA
Score
For further information on the scoring thresholds under the California Agricultural LESA Model, consult Section 4 of the Instruction Manual.

78.6 61.14

19. 7

15.3 35.0
30 5210
0 4.5

7.8 1.5

0.0 13.84

8.8

Page 1878 of 4069 ends

Agenda Item #6.4.

Average Annual Daily Criteria Pollutant Emissions Hunter Subdivision Project Unmitigated Construction tons Unmitigated Construction average lbs/day Year ROG Nox PM10 exh PM2.5 exh Year ROG Nox PM10 exh PM2.5 exh 2023 0.2271 1.577 0.0722 0.0675 Total 3.1 12.7 0.5 0.5
2024 0.1352 0.00929 0.00046 0.00046

0.2544 1.0927 0.0469 0.0441
2025 0.1602 1.3947 0.0552 0.052
2026 0.3227 0.1578 0.00631 0.00596

0.2447 1.015 0.0403 0.0379
2027 0.244 1.0137 0.0403 0.0379
2028 0.2074 0.9791 0.036 0.0344
Total 1.7957 7.23929 0.29767 0.28022
Construction Duration: 1142 days Total Duration
Site Preparation 3/20/2023 3/31/2023 10 days
Grading 4/1/2023 4/28/2023 20 days
Paving 4/29/2023 5/26/2023 20 days
Building Construction 5/27/2023 12/22/2023 150 days
Architectural Coating 12/23/2023 1/19/2024 20 days
Building Construction 3/18/2024 10/11/2024 150 days
Architectural Coating 10/12/2024 11/8/2024 20 days
Building Construction 3/17/2025 1/30/2026 230 days
Architectural Coating 1/31/2026 2/25/2026 18 days
Building Construction 3/23/2026 10/16/2026 150 days
Architectural Coating 10/17/2026 11/11/2026 18 days
Phase 1
Phase 2
Phase 3
Phase 4

Page 1879 of 4069 ends

Agenda Item #6.4.

Building Construction 3/22/2027 10/15/2027 150 days
Architectural Coating 10/16/2027 11/10/2027 18 days
Building Construction 3/20/2028 10/13/2028 150 days
Architectural Coating 10/14/2028 11/8/2028 18 days
1142 days
Phase 5
Phase 6

Page 1880 of 4069 ends

Agenda Item #6.4.

Page 1 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Annual CalEEMod Version: CalEEMod.2016.3.2
Date: 3/3/2021 9:32 AM
Hunter Subdivision Project - First Year
Napa County, Annual

1.0 Project Characteristics

1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population Other Asphalt Surfaces 5.50 Acre 5.50 239,580.00 0
City Park 0.06 Acre 0.06 2,613.60 0
Apartments Low Rise 2.00 Dwelling Unit 0.13 2,000.00 2
Single Family Housing 9.00 Dwelling Unit 2.92 16,200.00 22

1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 3.6 Precipitation Freq (Days) 64 Climate Zone 4 Operational Year 2024
Utility Company Pacific Gas & Electric Company
CO2 Intensity
(lb/MWhr)
641.35 CH4 Intensity
(lb/MWhr)

0.029 N2O Intensity
(lb/MWhr)

0.006

1.3 User Entered Comments & Non-Default Data
Project Characteristics - Hunter Subdivision Project. BAAQMD.

Land Use - Construction of 9 SF residences and 4 ADUs. Updated population per City of St Helena avg household size per BayAreaCensus.

Construction Phase - Assumed project would begin construction Spring 2023 (March), with completion in January 2024.

Off-road Equipment - Default equipment assumed.

Off-road Equipment - Default equipment assumed.

Off-road Equipment - Default equipment assumed. Page 1881 of 4069 Agenda Item #6.4.

Page 2 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Annual Off-road Equipment - Default equipment assumed.

Off-road Equipment - Default equipment assumed.

Trips and VMT - Assumed same trips for construction of all res dwelling units.

Grading - Assumed site would be balanced.

Table Name Column Name Default Value New Value
tblConstructionPhase NumDays 230.00 150.00
tblConstructionPhase PhaseEndDate 4/12/2024 5/26/2023
tblConstructionPhase PhaseEndDate 3/15/2024 12/22/2023
tblConstructionPhase PhaseEndDate 5/10/2024 1/19/2024
tblConstructionPhase PhaseStartDate 3/16/2024 4/29/2023 tblConstructionPhase PhaseStartDate 4/29/2023 5/27/2023 tblConstructionPhase PhaseStartDate 4/13/2024 12/23/2023 tblLandUse Population 6.00 2.00
tblLandUse Population 26.00 22.00
tblTripsAndVMT VendorTripNumber 0.00 2.00
tblTripsAndVMT VendorTripNumber 41.00 11.00
tblTripsAndVMT WorkerTripNumber 15.00 20.00
tblTripsAndVMT WorkerTripNumber 106.00 55.00
tblTripsAndVMT WorkerTripNumber 21.00 11.00

Page 1882 of 4069 ends

Agenda Item #6.4.

Page 3 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Annual Exhaust
PM10
PM10
Total

2.0 Emissions Summary

2.1 Overall Construction
NBio- CO2 Total CO2
Unmitigated Construction
ROG NOx CO SO2 Fugitive
PM10
CH4 N2O CO2e
Year tons/yr MT/yr
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2
2023 0.2271 1.5770 1.7270 3.2700e0030.1977 0.0722 0.2698 0.0946 0.0675 0.1621 0.0000 286.2994 286.2994 0.0633 0.0000 287.8816 2024 0.1352 9.2900e0030.0152 3.0000e0056.5000e0044.6000e0041.1100e0031.7000e0044.6000e0046.3000e0040.0000 2.3984 2.3984 1.2000e0040.0000 2.4014 Maximum 0.2271 1.5770 1.7270 3.2700e0030.1977 0.0722 0.2698 0.0946 0.0675 0.1621 0.0633 0.0000 287.8816 SO2 Fugitive
PM10
Exhaust
PM10

0.0000 286.2994 286.2994
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction
ROG NOx CO Total CO2 CH4 N2O CO2e
Year tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
2023 0.2271 1.5770 1.7270 3.2700e0030.1120 0.0722 0.1841 0.0488 0.0675 0.1162 0.0000 286.2991 286.2991 0.0633 0.0000 287.8814 2024 0.1352 9.2900e0030.0152 3.0000e0056.5000e0044.6000e0041.1100e0031.7000e0044.6000e0046.3000e0040.0000 2.3984 2.3984 1.2000e0040.0000 2.4014 Maximum 0.2271 1.5770 1.7270 3.2700e0030.1120 0.0722 0.1841 0.0488 0.0675 0.1162 0.0000 286.2991 286.2991 0.0633 0.0000 287.8814 ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction

0.00 0.00 0.00 0.00 43.22 0.00 31.64 48.37 0.00 28.17 0.00 0.00 0.00 0.00 0.00 0.00

Page 1883 of 4069 ends

Agenda Item #6.4.

Page 4 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Annual

3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date End Date Num Days
Week
Num Days Phase Description
1 Site Preparation Site Preparation 3/20/2023 3/31/2023 5 10 2 Grading Grading 4/1/2023 4/28/2023 5 20
150
3 Paving Paving 4/29/2023 5/26/2023 5
1/19/2024 5
20 4 Building Construction Building Construction 5/27/2023 12/22/2023 5 20 Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 10
Acres of Paving: 5.5
Residential Indoor: 36,855; Residential Outdoor: 12,285; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking 5 Architectural Coating Architectural Coating 12/23/2023 OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Site Preparation Rubber Tired Dozers 3 8.00 247 0.40
Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Grading Excavators 1 8.00 158 0.38
Grading Graders 1 8.00 187 0.41
Grading Rubber Tired Dozers 1 8.00 247 0.40
Grading Tractors/Loaders/Backhoes 3 8.00 97 0.37
Paving Pavers 2 8.00 130 0.42
Paving Paving Equipment 2 8.00 132 0.36
Paving Rollers 2 8.00 80 0.38
Building Construction Cranes 1 7.00 231 0.29
Building Construction Forklifts 3 8.00 89 0.20
Building Construction Generator Sets 1 8.00 84 0.74
Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Page 1884 of 4069 Agenda Item #6.4.

Page 5 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Annual Building Construction Welders 1 8.00 46 0.45
Architectural Coating Air Compressors 1 6.00 78 0.48
Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle
Class
Hauling
Vehicle
Class
Site Preparation 7 18.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Grading 6 20.00 2.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Paving 6 15.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Building Construction 9 55.00 11.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Architectural Coating 1 11.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Page 1885 of 4069 Agenda Item #6.4.

Page 6 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Annual

3.1 Mitigation Measures Construction
NOx CO SO2 Fugitive
PM10
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2
Water Exposed Area

3.2 Site Preparation - 2023
Unmitigated Construction On-Site
ROG NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM10
PM10
Total
Fugitive Dust 0.0903 0.0000 0.0903 0.0497 0.0000 0.0497 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0133 0.1376 0.0912 1.9000e0046.3300e0036.3300e0035.8200e0035.8200e0030.0000 16.7254 16.7254 5.4100e0030.0000 16.8606 Total 0.0133 0.1376 0.0912 1.9000e0045.4100e0030.0903 6.3300e- 0.0000 16.8606 003

0.0967 0.0497 5.8200e0030.0555
SO2 Fugitive
PM10
Exhaust
PM10

0.0000 16.7254 16.7254
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.8000e0041.8000e0041.9700e0031.0000e0057.1000e0040.0000 7.2000e0041.9000e0040.0000 1.9000e0040.0000 0.5494 0.5494 1.0000e0050.0000 0.5497 Total 2.8000e0041.8000e0041.9700e0031.0000e0051.0000e0057.1000e- 0.0000 0.5497 004

0.0000 7.2000e0041.9000e0040.0000 1.9000e0040.0000 0.5494 0.5494

Page 1886 of 4069 ends

Agenda Item #6.4.

Page 7 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Annual SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Fugitive Dust 0.0407 0.0000 0.0407 0.0223 0.0000 0.0223 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0133 0.1376 0.0912 1.9000e0046.3300e0036.3300e0035.8200e0035.8200e0030.0000 16.7253 16.7253 5.4100e0030.0000 16.8606 Total 0.0133 0.1376 0.0912 1.9000e0045.4100e0030.0407 6.3300e- 0.0000 16.8606 003

0.0470 0.0223 5.8200e0030.0282
SO2 Fugitive
PM10
Exhaust
PM10

0.0000 16.7253 16.7253
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.8000e0041.8000e0041.9700e0031.0000e0057.1000e0040.0000 7.2000e0041.9000e0040.0000 1.9000e0040.0000 0.5494 0.5494 1.0000e0050.0000 0.5497 Total 2.8000e0041.8000e0041.9700e0031.0000e0051.0000e0057.1000e- 0.0000 0.5497 004

0.0000 7.2000e0041.9000e0040.0000 1.9000e0040.0000 0.5494 0.5494

Page 1887 of 4069 ends

Agenda Item #6.4.

Page 8 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Annual SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2

3.3 Grading - 2023
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Fugitive Dust 0.0655 0.0000 0.0655 0.0337 0.0000 0.0337 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0171 0.1794 0.1475 3.0000e0047.7500e0037.7500e0037.1300e0037.1300e0030.0000 26.0606 26.0606 8.4300e0030.0000 26.2713 Total 0.0171 0.1794 0.1475 3.0000e0048.4300e0030.0655 7.7500e- 0.0000 26.2713 003

0.0733 0.0337 7.1300e0030.0408
SO2 Fugitive
PM10
Exhaust
PM10

0.0000 26.0606 26.0606
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 5.0000e0051.5800e0034.5000e0041.0000e0051.3000e0040.0000 1.3000e0044.0000e0050.0000 4.0000e0050.0000 0.4962 0.4962 2.0000e0050.0000 0.4967 Worker 6.2000e0044.0000e0044.3700e0031.0000e0051.5800e0031.0000e0051.5900e0034.2000e0041.0000e0054.3000e0040.0000 1.2208 1.2208 3.0000e0050.0000 1.2215 Total 6.7000e0041.9800e0034.8200e0032.0000e0055.0000e0051.7100e- 0.0000 1.7182 003

1.0000e0051.7200e0034.6000e0041.0000e0054.7000e0040.0000 1.7169 1.7169

Page 1888 of 4069 ends

Agenda Item #6.4.

Page 9 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Annual SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Fugitive Dust 0.0295 0.0000 0.0295 0.0152 0.0000 0.0152 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0171 0.1794 0.1475 3.0000e0047.7500e0037.7500e0037.1300e0037.1300e0030.0000 26.0606 26.0606 8.4300e0030.0000 26.2713 Total 0.0171 0.1794 0.1475 3.0000e0048.4300e0030.0295 7.7500e- 0.0000 26.2713 003

0.0372 0.0152 7.1300e0030.0223
SO2 Fugitive
PM10
Exhaust
PM10

0.0000 26.0606 26.0606
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 5.0000e0051.5800e0034.5000e0041.0000e0051.3000e0040.0000 1.3000e0044.0000e0050.0000 4.0000e0050.0000 0.4962 0.4962 2.0000e0050.0000 0.4967 Worker 6.2000e0044.0000e0044.3700e0031.0000e0051.5800e0031.0000e0051.5900e0034.2000e0041.0000e0054.3000e0040.0000 1.2208 1.2208 3.0000e0050.0000 1.2215 Total 6.7000e0041.9800e0034.8200e0032.0000e0055.0000e0051.7100e- 0.0000 1.7182 003

1.0000e0051.7200e0034.6000e0041.0000e0054.7000e0040.0000 1.7169 1.7169

Page 1889 of 4069 ends

Agenda Item #6.4.

Page 10 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Annual SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2

3.4 Paving - 2023
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 0.0103 0.1019 0.1458 2.3000e0045.1000e0035.1000e0034.6900e0034.6900e0030.0000 20.0269 20.0269 6.4800e0030.0000 20.1888 Paving 7.2100e0030.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0175 0.1019 0.1458 2.3000e0046.4800e0035.1000e- 0.0000 20.1888 003

5.1000e0034.6900e0034.6900e003
SO2 Fugitive
PM10
Exhaust
PM10

0.0000 20.0269 20.0269
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 4.6000e0043.0000e0043.2800e0031.0000e0051.1900e0031.0000e0051.1900e0033.2000e0041.0000e0053.2000e0040.0000 0.9156 0.9156 2.0000e0050.0000 0.9161 Total 4.6000e0043.0000e0043.2800e0031.0000e0052.0000e0051.1900e- 0.0000 0.9161 003

1.0000e0051.1900e0033.2000e0041.0000e0053.2000e0040.0000 0.9156 0.9156

Page 1890 of 4069 ends

Agenda Item #6.4.

Page 11 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Annual SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 0.0103 0.1019 0.1458 2.3000e0045.1000e0035.1000e0034.6900e0034.6900e0030.0000 20.0268 20.0268 6.4800e0030.0000 20.1888 Paving 7.2100e0030.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0175 0.1019 0.1458 2.3000e0046.4800e0035.1000e- 0.0000 20.1888 003

5.1000e0034.6900e0034.6900e003
SO2 Fugitive
PM10
Exhaust
PM10

0.0000 20.0268 20.0268
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 4.6000e0043.0000e0043.2800e0031.0000e0051.1900e0031.0000e0051.1900e0033.2000e0041.0000e0053.2000e0040.0000 0.9156 0.9156 2.0000e0050.0000 0.9161 Total 4.6000e0043.0000e0043.2800e0031.0000e0052.0000e0051.1900e- 0.0000 0.9161 003

1.0000e0051.1900e0033.2000e0041.0000e0053.2000e0040.0000 0.9156 0.9156

Page 1891 of 4069 ends

Agenda Item #6.4.

Page 12 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Annual SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2

3.5 Building Construction - 2023
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 0.1180 1.0789 1.2183 2.0200e0030.0525 0.0525 0.0494 0.0494 0.0000 173.8536 173.8536 0.0414 0.0000 174.8875 Total 0.1180 1.0789 1.2183 2.0200e0030.0525 0.0525 0.0494 0.0494 0.0414 0.0000 174.8875 SO2 Fugitive
PM10
Exhaust
PM10

0.0000 173.8536 173.8536
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.9400e0030.0652 0.0187 2.1000e0045.4100e0038.0000e0055.4800e0031.5600e0037.0000e0051.6400e0030.0000 20.4667 20.4667 9.3000e0040.0000 20.4899 Worker 0.0127 8.2500e0030.0902 2.8000e0040.0326 2.1000e0040.0328 8.6700e0031.9000e0048.8600e0030.0000 25.1783 25.1783 5.6000e0040.0000 25.1924 Total 0.0147 0.0735 0.1089 4.9000e0041.4900e0030.0380 2.9000e- 0.0000 45.6823 004

0.0383 0.0102 2.6000e0040.0105 0.0000 45.6450 45.6450

Page 1892 of 4069 ends

Agenda Item #6.4.

Page 13 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Annual SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 0.1180 1.0789 1.2183 2.0200e0030.0525 0.0525 0.0494 0.0494 0.0000 173.8534 173.8534 0.0414 0.0000 174.8873 Total 0.1180 1.0789 1.2183 2.0200e0030.0525 0.0525 0.0494 0.0494 0.0414 0.0000 174.8873 SO2 Fugitive
PM10
Exhaust
PM10

0.0000 173.8534 173.8534
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.9400e0030.0652 0.0187 2.1000e0045.4100e0038.0000e0055.4800e0031.5600e0037.0000e0051.6400e0030.0000 20.4667 20.4667 9.3000e0040.0000 20.4899 Worker 0.0127 8.2500e0030.0902 2.8000e0040.0326 2.1000e0040.0328 8.6700e0031.9000e0048.8600e0030.0000 25.1783 25.1783 5.6000e0040.0000 25.1924 Total 0.0147 0.0735 0.1089 4.9000e0041.4900e0030.0380 2.9000e- 0.0000 45.6823 004

0.0383 0.0102 2.6000e0040.0105 0.0000 45.6450 45.6450

Page 1893 of 4069 ends

Agenda Item #6.4.

Page 14 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Annual SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2

3.6 Architectural Coating - 2023
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 0.0445 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 4.8000e0043.2600e0034.5300e0031.0000e0051.8000e0041.8000e0041.8000e0041.8000e0040.0000 0.6383 0.6383 4.0000e0050.0000 0.6393 Total 0.0450 3.2600e0034.5300e0031.0000e0054.0000e0051.8000e- 0.0000 0.6393 004

1.8000e0041.8000e0041.8000e004
SO2 Fugitive
PM10
Exhaust
PM10

0.0000 0.6383 0.6383
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 8.0000e0056.0000e0056.0000e0040.0000 2.2000e0040.0000 2.2000e0046.0000e0050.0000 6.0000e0050.0000 0.1679 0.1679 0.0000 0.0000 0.1680 Total 8.0000e0056.0000e0056.0000e0040.0000 2.2000e- 0.0000 0.0000 0.1680 004

0.0000 2.2000e0046.0000e0050.0000 6.0000e0050.0000 0.1679 0.1679

Page 1894 of 4069 ends

Agenda Item #6.4.

Page 15 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Annual SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 0.0445 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 4.8000e0043.2600e0034.5300e0031.0000e0051.8000e0041.8000e0041.8000e0041.8000e0040.0000 0.6383 0.6383 4.0000e0050.0000 0.6393 Total 0.0450 3.2600e0034.5300e0031.0000e0054.0000e0051.8000e- 0.0000 0.6393 004

1.8000e0041.8000e0041.8000e004
SO2 Fugitive
PM10
Exhaust
PM10

0.0000 0.6383 0.6383
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 8.0000e0056.0000e0056.0000e0040.0000 2.2000e0040.0000 2.2000e0046.0000e0050.0000 6.0000e0050.0000 0.1679 0.1679 0.0000 0.0000 0.1680 Total 8.0000e0056.0000e0056.0000e0040.0000 2.2000e- 0.0000 0.0000 0.1680 004

0.0000 2.2000e0046.0000e0050.0000 6.0000e0050.0000 0.1679 0.1679

Page 1895 of 4069 ends

Agenda Item #6.4.

Page 16 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Annual SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2

3.6 Architectural Coating - 2024
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 0.1336 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 1.3600e0039.1400e0030.0136 2.0000e0054.6000e0044.6000e0044.6000e0044.6000e0040.0000 1.9149 1.9149 1.1000e0040.0000 1.9176 Total 0.1349 9.1400e0030.0136 2.0000e0051.1000e0044.6000e- 0.0000 1.9176 004

4.6000e0044.6000e0044.6000e004
SO2 Fugitive
PM10
Exhaust
PM10

0.0000 1.9149 1.9149
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.4000e0041.5000e0041.6600e0031.0000e0056.5000e0040.0000 6.6000e0041.7000e0040.0000 1.8000e0040.0000 0.4835 0.4835 1.0000e0050.0000 0.4837 Total 2.4000e0041.5000e0041.6600e0031.0000e0051.0000e0056.5000e- 0.0000 0.4837 004

0.0000 6.6000e0041.7000e0040.0000 1.8000e0040.0000 0.4835 0.4835

Page 1896 of 4069 ends

Agenda Item #6.4.

Page 17 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Annual SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 0.1336 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 1.3600e0039.1400e0030.0136 2.0000e0054.6000e0044.6000e0044.6000e0044.6000e0040.0000 1.9149 1.9149 1.1000e0040.0000 1.9176 Total 0.1349 9.1400e0030.0136 2.0000e0051.1000e0044.6000e- 0.0000 1.9176 004

4.6000e0044.6000e0044.6000e004
SO2 Fugitive
PM10
Exhaust
PM10

0.0000 1.9149 1.9149
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.4000e0041.5000e0041.6600e0031.0000e0056.5000e0040.0000 6.6000e0041.7000e0040.0000 1.8000e0040.0000 0.4835 0.4835 1.0000e0050.0000 0.4837 Total 2.4000e0041.5000e0041.6600e0031.0000e0051.0000e0056.5000e- 0.0000 0.4837 004

0.0000 6.6000e0041.7000e0040.0000 1.8000e0040.0000 0.4835 0.4835

Page 1897 of 4069 ends

Agenda Item #6.4.

Page 1 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Summer CalEEMod Version: CalEEMod.2016.3.2
Date: 3/3/2021 9:35 AM
Hunter Subdivision Project - First Year
Napa County, Summer

1.0 Project Characteristics

1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population Other Asphalt Surfaces 5.50 Acre 5.50 239,580.00 0
City Park 0.06 Acre 0.06 2,613.60 0
Apartments Low Rise 2.00 Dwelling Unit 0.13 2,000.00 2
Single Family Housing 9.00 Dwelling Unit 2.92 16,200.00 22

1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 3.6 Precipitation Freq (Days) 64 Climate Zone 4 Operational Year 2024
Utility Company Pacific Gas & Electric Company
CO2 Intensity
(lb/MWhr)
641.35 CH4 Intensity
(lb/MWhr)

0.029 N2O Intensity
(lb/MWhr)

0.006

1.3 User Entered Comments & Non-Default Data
Project Characteristics - Hunter Subdivision Project. BAAQMD.

Land Use - Construction of 9 SF residences and 4 ADUs. Updated population per City of St Helena avg household size per BayAreaCensus.

Construction Phase - Assumed project would begin construction Spring 2023 (March), with completion in January 2024.

Off-road Equipment - Default equipment assumed.

Off-road Equipment - Default equipment assumed.

Off-road Equipment - Default equipment assumed. Page 1898 of 4069 Agenda Item #6.4.

Page 2 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Summer Off-road Equipment - Default equipment assumed.

Off-road Equipment - Default equipment assumed.

Trips and VMT - Assumed same trips for construction of all res dwelling units.

Grading - Assumed site would be balanced.

Table Name Column Name Default Value New Value
tblConstructionPhase NumDays 230.00 150.00
tblConstructionPhase PhaseEndDate 4/12/2024 5/26/2023
tblConstructionPhase PhaseEndDate 3/15/2024 12/22/2023
tblConstructionPhase PhaseEndDate 5/10/2024 1/19/2024
tblConstructionPhase PhaseStartDate 3/16/2024 4/29/2023 tblConstructionPhase PhaseStartDate 4/29/2023 5/27/2023 tblConstructionPhase PhaseStartDate 4/13/2024 12/23/2023 tblLandUse Population 6.00 2.00
tblLandUse Population 26.00 22.00
tblTripsAndVMT VendorTripNumber 0.00 2.00
tblTripsAndVMT VendorTripNumber 41.00 11.00
tblTripsAndVMT WorkerTripNumber 15.00 20.00
tblTripsAndVMT WorkerTripNumber 106.00 55.00
tblTripsAndVMT WorkerTripNumber 21.00 11.00

Page 1899 of 4069 ends

Agenda Item #6.4.

Page 3 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Summer Exhaust
PM10
PM10
Total

2.0 Emissions Summary

2.1 Overall Construction (Maximum Daily Emission)
NBio- CO2 Total CO2
Unmitigated Construction
ROG NOx CO SO2 Fugitive
PM10
CH4 N2O CO2e
Year lb/day lb/day
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2
2023 18.0361 27.5558 18.6698 0.0394 18.2141 1.2669 19.4811 9.9699 1.1656 11.1355 0.0000 3,816.822 9 3,816.822
9 1.1954 0.0000 3,846.708
8 2024 18.0228 1.2362 2.0497 3.7300e0030.0904 0.0615 0.1518 0.0240 0.0614 0.0854 0.0000 357.4378 357.4378 0.0174 0.0000 357.8735 Maximum 18.0361 27.5558 18.6698 0.0394 1.1954 0.0000 3,846.708 8 18.2141 1.2669 19.4811 9.9699 1.1656 11.1355
SO2 Fugitive
PM10
Exhaust
PM10

0.0000 3,816.822
9 3,816.822
9 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction
ROG NOx CO Total CO2 CH4 N2O CO2e
Year lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
2023 18.0361 27.5558 18.6698 0.0394 8.2777 1.2669 9.5446 4.5080 1.1656 5.6736 0.0000 3,816.822 9 3,816.822
9 1.1954 0.0000 3,846.708
8 2024 18.0228 1.2362 2.0497 3.7300e0030.0904 0.0615 0.1518 0.0240 0.0614 0.0854 0.0000 357.4378 357.4378 0.0174 0.0000 357.8735 Maximum 18.0361 27.5558 18.6698 0.0394 8.2777 1.2669 9.5446 4.5080 1.1656 5.6736 0.0000 3,816.822 9 3,816.822
9 1.1954 0.0000 3,846.708
8 ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction

0.00 0.00 0.00 0.00 54.28 0.00 50.61 54.65 0.00 48.68 0.00 0.00 0.00 0.00 0.00 0.00

Page 1900 of 4069 ends

Agenda Item #6.4.

Page 4 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Summer

3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date End Date Num Days
Week
Num Days Phase Description
1 Site Preparation Site Preparation 3/20/2023 3/31/2023 5 10 2 Grading Grading 4/1/2023 4/28/2023 5 20
150
3 Paving Paving 4/29/2023 5/26/2023 5
1/19/2024 5
20 4 Building Construction Building Construction 5/27/2023 12/22/2023 5 20 Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 10
Acres of Paving: 5.5
Residential Indoor: 36,855; Residential Outdoor: 12,285; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area:
5 Architectural Coating Architectural Coating 12/23/2023 OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Site Preparation Rubber Tired Dozers 3 8.00 247 0.40
Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Grading Excavators 1 8.00 158 0.38
Grading Graders 1 8.00 187 0.41
Grading Rubber Tired Dozers 1 8.00 247 0.40
Grading Tractors/Loaders/Backhoes 3 8.00 97 0.37
Paving Pavers 2 8.00 130 0.42
Paving Paving Equipment 2 8.00 132 0.36
Paving Rollers 2 8.00 80 0.38
Building Construction Cranes 1 7.00 231 0.29
Building Construction Forklifts 3 8.00 89 0.20
Building Construction Generator Sets 1 8.00 84 0.74
Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Page 1901 of 4069 Agenda Item #6.4.

Page 5 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Summer Building Construction Welders 1 8.00 46 0.45
Architectural Coating Air Compressors 1 6.00 78 0.48
Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle
Class
Hauling
Vehicle
Class
Site Preparation 7 18.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Grading 6 20.00 2.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Paving 6 15.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Building Construction 9 55.00 11.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Architectural Coating 1 11.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Page 1902 of 4069 Agenda Item #6.4.

Page 6 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Summer

3.1 Mitigation Measures Construction
NOx CO SO2 Fugitive
PM10
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2
Water Exposed Area

3.2 Site Preparation - 2023
Unmitigated Construction On-Site
ROG NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM10
PM10
Total
Fugitive Dust 18.0663 0.0000 18.0663 9.9307 0.0000 9.9307 0.0000 0.0000 Off-Road 2.6595 27.5242 18.2443 0.0381 1.2660 1.2660 1.1647 1.1647 3,687.308 1 3,687.308
1 1.1926 3,717.121
9 Total 2.6595 27.5242 18.2443 0.0381 1.1926 3,717.121
9 18.0663 1.2660 19.3323 9.9307 1.1647 11.0954
SO2 Fugitive
PM10
Exhaust
PM10
3,687.308
1 3,687.308
1 PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0583 0.0317 0.4255 1.3000e0030.1479 9.0000e0040.1488 0.0392 8.3000e0040.0401 129.5148 129.5148 2.8900e003129.5870 Total 0.0583 0.0317 0.4255 1.3000e0032.8900e0030.1479 9.0000e- 129.5870 004

0.1488 0.0392 8.3000e0040.0401 129.5148 129.5148

Page 1903 of 4069 ends

Agenda Item #6.4.

Page 7 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Summer SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Fugitive Dust 8.1298 0.0000 8.1298 4.4688 0.0000 4.4688 0.0000 0.0000 Off-Road 2.6595 27.5242 18.2443 0.0381 1.2660 1.2660 1.1647 1.1647 0.0000 3,687.308 1 3,687.308
1 1.1926 3,717.121
9 Total 2.6595 27.5242 18.2443 0.0381 1.1926 3,717.121
9 8.1298 1.2660 9.3958 4.4688 1.1647 5.6336
SO2 Fugitive
PM10
Exhaust
PM10

0.0000 3,687.308
1 3,687.308
1 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0583 0.0317 0.4255 1.3000e0030.1479 9.0000e0040.1488 0.0392 8.3000e0040.0401 129.5148 129.5148 2.8900e003129.5870 Total 0.0583 0.0317 0.4255 1.3000e0032.8900e0030.1479 9.0000e- 129.5870 004

0.1488 0.0392 8.3000e0040.0401 129.5148 129.5148

Page 1904 of 4069 ends

Agenda Item #6.4.

Page 8 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Summer SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2

3.3 Grading - 2023
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Fugitive Dust 6.5523 0.0000 6.5523 3.3675 0.0000 3.3675 0.0000 0.0000 Off-Road 1.7109 17.9359 14.7507 0.0297 0.7749 0.7749 0.7129 0.7129 2,872.691 0 2,872.691
0 0.9291 2,895.918
2 Total 1.7109 17.9359 14.7507 0.0297 0.9291 2,895.918
2 6.5523 0.7749 7.3273 3.3675 0.7129 4.0804
SO2 Fugitive
PM10
Exhaust
PM10
2,872.691
0 2,872.691
0 PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.6000e0030.1568 0.0427 5.2000e0040.0135 1.8000e0040.0137 3.8900e0031.7000e0044.0700e00355.2560 55.2560 2.4000e00355.3159 Worker 0.0648 0.0352 0.4727 1.4400e0030.1643 1.0000e0030.1653 0.0436 9.2000e0040.0445 143.9053 143.9053 3.2100e003143.9855 Total 0.0694 0.1919 0.5154 1.9600e0035.6100e0030.1778 1.1800e- 199.3014 003

0.1790 0.0475 1.0900e0030.0486 199.1613 199.1613

Page 1905 of 4069 ends

Agenda Item #6.4.

Page 9 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Summer SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Fugitive Dust 2.9486 0.0000 2.9486 1.5154 0.0000 1.5154 0.0000 0.0000 Off-Road 1.7109 17.9359 14.7507 0.0297 0.7749 0.7749 0.7129 0.7129 0.0000 2,872.691 0 2,872.691
0 0.9291 2,895.918
2 Total 1.7109 17.9359 14.7507 0.0297 0.9291 2,895.918
2 2.9486 0.7749 3.7235 1.5154 0.7129 2.2283
SO2 Fugitive
PM10
Exhaust
PM10

0.0000 2,872.691
0 2,872.691
0 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.6000e0030.1568 0.0427 5.2000e0040.0135 1.8000e0040.0137 3.8900e0031.7000e0044.0700e00355.2560 55.2560 2.4000e00355.3159 Worker 0.0648 0.0352 0.4727 1.4400e0030.1643 1.0000e0030.1653 0.0436 9.2000e0040.0445 143.9053 143.9053 3.2100e003143.9855 Total 0.0694 0.1919 0.5154 1.9600e0035.6100e0030.1778 1.1800e- 199.3014 003

0.1790 0.0475 1.0900e0030.0486 199.1613 199.1613

Page 1906 of 4069 ends

Agenda Item #6.4.

Page 10 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Summer SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2

3.4 Paving - 2023
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 1.0327 10.1917 14.5842 0.0228 0.5102 0.5102 0.4694 0.4694 2,207.584 1 2,207.584
1 0.7140 2,225.433
6 Paving 0.7205 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.7532 10.1917 14.5842 0.0228 0.7140 2,225.433
6 0.5102 0.5102 0.4694 0.4694
SO2 Fugitive
PM10
Exhaust
PM10
2,207.584
1 2,207.584
1 PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0486 0.0264 0.3546 1.0800e0030.1232 7.5000e0040.1240 0.0327 6.9000e0040.0334 107.9290 107.9290 2.4100e003107.9891 Total 0.0486 0.0264 0.3546 1.0800e0032.4100e0030.1232 7.5000e- 107.9891 004

0.1240 0.0327 6.9000e0040.0334 107.9290 107.9290

Page 1907 of 4069 ends

Agenda Item #6.4.

Page 11 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Summer SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 1.0327 10.1917 14.5842 0.0228 0.5102 0.5102 0.4694 0.4694 0.0000 2,207.584 1 2,207.584
1 0.7140 2,225.433
6 Paving 0.7205 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.7532 10.1917 14.5842 0.0228 0.7140 2,225.433
6 0.5102 0.5102 0.4694 0.4694
SO2 Fugitive
PM10
Exhaust
PM10

0.0000 2,207.584
1 2,207.584
1 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0486 0.0264 0.3546 1.0800e0030.1232 7.5000e0040.1240 0.0327 6.9000e0040.0334 107.9290 107.9290 2.4100e003107.9891 Total 0.0486 0.0264 0.3546 1.0800e0032.4100e0030.1232 7.5000e- 107.9891 004

0.1240 0.0327 6.9000e0040.0334 107.9290 107.9290

Page 1908 of 4069 ends

Agenda Item #6.4.

Page 12 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Summer SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2

3.5 Building Construction - 2023
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 1.5728 14.3849 16.2440 0.0269 0.6997 0.6997 0.6584 0.6584 2,555.209 9 2,555.209
9 0.6079 2,570.406
1 Total 1.5728 14.3849 16.2440 0.0269 0.6079 2,570.406
1 0.6997 0.6997 0.6584 0.6584
SO2 Fugitive
PM10
Exhaust
PM10
2,555.209
9 2,555.209
9 PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0253 0.8621 0.2348 2.8700e0030.0744 9.9000e0040.0754 0.0214 9.5000e0040.0224 303.9081 303.9081 0.0132 304.2374 Worker 0.1782 0.0967 1.3000 3.9700e0030.4518 2.7600e0030.4546 0.1198 2.5400e0030.1224 395.7396 395.7396 8.8200e003395.9602 Total 0.2035 0.9588 1.5348 6.8400e0030.5262 3.7500e- 0.0220 700.1976 003

0.5300 0.1413 3.4900e0030.1447 699.6476 699.6476

Page 1909 of 4069 ends

Agenda Item #6.4.

Page 13 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Summer SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 1.5728 14.3849 16.2440 0.0269 0.6997 0.6997 0.6584 0.6584 0.0000 2,555.209 9 2,555.209
9 0.6079 2,570.406
1 Total 1.5728 14.3849 16.2440 0.0269 0.6079 2,570.406
1 0.6997 0.6997 0.6584 0.6584
SO2 Fugitive
PM10
Exhaust
PM10

0.0000 2,555.209
9 2,555.209
9 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0253 0.8621 0.2348 2.8700e0030.0744 9.9000e0040.0754 0.0214 9.5000e0040.0224 303.9081 303.9081 0.0132 304.2374 Worker 0.1782 0.0967 1.3000 3.9700e0030.4518 2.7600e0030.4546 0.1198 2.5400e0030.1224 395.7396 395.7396 8.8200e003395.9602 Total 0.2035 0.9588 1.5348 6.8400e0030.5262 3.7500e- 0.0220 700.1976 003

0.5300 0.1413 3.4900e0030.1447 699.6476 699.6476

Page 1910 of 4069 ends

Agenda Item #6.4.

Page 14 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Summer SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2

3.6 Architectural Coating - 2023
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 17.8088 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1917 1.3030 1.8111 2.9700e0030.0708 0.0708 0.0708 0.0708 281.4481 281.4481 0.0168 281.8690 Total 18.0005 1.3030 1.8111 2.9700e0030.0708 0.0708 0.0708 0.0708 0.0168 281.8690 SO2 Fugitive
PM10
Exhaust
PM10
281.4481 281.4481
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0357 0.0193 0.2600 7.9000e0040.0904 5.5000e0040.0909 0.0240 5.1000e0040.0245 79.1479 79.1479 1.7600e00379.1920 Total 0.0357 0.0193 0.2600 7.9000e0041.7600e0030.0904 5.5000e- 79.1920 004

0.0909 0.0240 5.1000e0040.0245 79.1479 79.1479

Page 1911 of 4069 ends

Agenda Item #6.4.

Page 15 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Summer SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 17.8088 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1917 1.3030 1.8111 2.9700e0030.0708 0.0708 0.0708 0.0708 0.0000 281.4481 281.4481 0.0168 281.8690 Total 18.0005 1.3030 1.8111 2.9700e0030.0708 0.0708 0.0708 0.0708 0.0168 281.8690 SO2 Fugitive
PM10
Exhaust
PM10

0.0000 281.4481 281.4481
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0357 0.0193 0.2600 7.9000e0040.0904 5.5000e0040.0909 0.0240 5.1000e0040.0245 79.1479 79.1479 1.7600e00379.1920 Total 0.0357 0.0193 0.2600 7.9000e0041.7600e0030.0904 5.5000e- 79.1920 004

0.0909 0.0240 5.1000e0040.0245 79.1479 79.1479

Page 1912 of 4069 ends

Agenda Item #6.4.

Page 16 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Summer SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2

3.6 Architectural Coating - 2024
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 17.8088 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1808 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 281.4481 281.4481 0.0159 281.8443 Total 17.9896 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 0.0159 281.8443 SO2 Fugitive
PM10
Exhaust
PM10
281.4481 281.4481
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0332 0.0174 0.2396 7.6000e0040.0904 5.4000e0040.0909 0.0240 4.9000e0040.0245 75.9897 75.9897 1.5800e00376.0292 Total 0.0332 0.0174 0.2396 7.6000e0041.5800e0030.0904 5.4000e- 76.0292 004

0.0909 0.0240 4.9000e0040.0245 75.9897 75.9897

Page 1913 of 4069 ends

Agenda Item #6.4.

Page 17 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Summer SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 17.8088 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1808 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 0.0000 281.4481 281.4481 0.0159 281.8443 Total 17.9896 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 0.0159 281.8443 SO2 Fugitive
PM10
Exhaust
PM10

0.0000 281.4481 281.4481
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0332 0.0174 0.2396 7.6000e0040.0904 5.4000e0040.0909 0.0240 4.9000e0040.0245 75.9897 75.9897 1.5800e00376.0292 Total 0.0332 0.0174 0.2396 7.6000e0041.5800e0030.0904 5.4000e- 76.0292 004

0.0909 0.0240 4.9000e0040.0245 75.9897 75.9897

Page 1914 of 4069 ends

Agenda Item #6.4.

Page 1 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Winter CalEEMod Version: CalEEMod.2016.3.2
Date: 3/3/2021 9:36 AM
Hunter Subdivision Project - First Year
Napa County, Winter

1.0 Project Characteristics

1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population Other Asphalt Surfaces 5.50 Acre 5.50 239,580.00 0
City Park 0.06 Acre 0.06 2,613.60 0
Apartments Low Rise 2.00 Dwelling Unit 0.13 2,000.00 2
Single Family Housing 9.00 Dwelling Unit 2.92 16,200.00 22

1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 3.6 Precipitation Freq (Days) 64 Climate Zone 4 Operational Year 2024
Utility Company Pacific Gas & Electric Company
CO2 Intensity
(lb/MWhr)
641.35 CH4 Intensity
(lb/MWhr)

0.029 N2O Intensity
(lb/MWhr)

0.006

1.3 User Entered Comments & Non-Default Data
Project Characteristics - Hunter Subdivision Project. BAAQMD.

Land Use - Construction of 9 SF residences and 4 ADUs. Updated population per City of St Helena avg household size per BayAreaCensus.

Construction Phase - Assumed project would begin construction Spring 2023 (March), with completion in January 2024.

Off-road Equipment - Default equipment assumed.

Off-road Equipment - Default equipment assumed.

Off-road Equipment - Default equipment assumed. Page 1915 of 4069 Agenda Item #6.4.

Page 2 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Winter Off-road Equipment - Default equipment assumed.

Off-road Equipment - Default equipment assumed.

Trips and VMT - Assumed same trips for construction of all res dwelling units.

Grading - Assumed site would be balanced.

Table Name Column Name Default Value New Value
tblConstructionPhase NumDays 230.00 150.00
tblConstructionPhase PhaseEndDate 4/12/2024 5/26/2023
tblConstructionPhase PhaseEndDate 3/15/2024 12/22/2023
tblConstructionPhase PhaseEndDate 5/10/2024 1/19/2024
tblConstructionPhase PhaseStartDate 3/16/2024 4/29/2023 tblConstructionPhase PhaseStartDate 4/29/2023 5/27/2023 tblConstructionPhase PhaseStartDate 4/13/2024 12/23/2023 tblLandUse Population 6.00 2.00
tblLandUse Population 26.00 22.00
tblTripsAndVMT VendorTripNumber 0.00 2.00
tblTripsAndVMT VendorTripNumber 41.00 11.00
tblTripsAndVMT WorkerTripNumber 15.00 20.00
tblTripsAndVMT WorkerTripNumber 106.00 55.00
tblTripsAndVMT WorkerTripNumber 21.00 11.00

Page 1916 of 4069 ends

Agenda Item #6.4.

Page 3 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Winter Exhaust
PM10
PM10
Total

2.0 Emissions Summary

2.1 Overall Construction (Maximum Daily Emission)
NBio- CO2 Total CO2
Unmitigated Construction
ROG NOx CO SO2 Fugitive
PM10
CH4 N2O CO2e
Year lb/day lb/day
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2
2023 18.0380 27.5643 18.6514 0.0393 18.2141 1.2669 19.4811 9.9699 1.1656 11.1355 0.0000 3,807.105 6 3,807.105
6 1.1953 0.0000 3,836.987
4 2024 18.0246 1.2408 2.0386 3.6800e0030.0904 0.0615 0.1518 0.0240 0.0614 0.0854 0.0000 351.7373 351.7373 0.0173 0.0000 352.1706 Maximum 18.0380 27.5643 18.6514 0.0393 1.1953 0.0000 3,836.987 4 18.2141 1.2669 19.4811 9.9699 1.1656 11.1355
SO2 Fugitive
PM10
Exhaust
PM10

0.0000 3,807.105
6 3,807.105
6 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction
ROG NOx CO Total CO2 CH4 N2O CO2e
Year lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
2023 18.0380 27.5643 18.6514 0.0393 8.2777 1.2669 9.5446 4.5080 1.1656 5.6736 0.0000 3,807.105 6 3,807.105
6 1.1953 0.0000 3,836.987
4 2024 18.0246 1.2408 2.0386 3.6800e0030.0904 0.0615 0.1518 0.0240 0.0614 0.0854 0.0000 351.7373 351.7373 0.0173 0.0000 352.1706 Maximum 18.0380 27.5643 18.6514 0.0393 8.2777 1.2669 9.5446 4.5080 1.1656 5.6736 0.0000 3,807.105 6 3,807.105
6 1.1953 0.0000 3,836.987
4 ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction

0.00 0.00 0.00 0.00 54.28 0.00 50.61 54.65 0.00 48.68 0.00 0.00 0.00 0.00 0.00 0.00

Page 1917 of 4069 ends

Agenda Item #6.4.

Page 4 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Winter

3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date End Date Num Days
Week
Num Days Phase Description
1 Site Preparation Site Preparation 3/20/2023 3/31/2023 5 10 2 Grading Grading 4/1/2023 4/28/2023 5 20
150
3 Paving Paving 4/29/2023 5/26/2023 5
1/19/2024 5
20 4 Building Construction Building Construction 5/27/2023 12/22/2023 5 20 Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 10
Acres of Paving: 5.5
Residential Indoor: 36,855; Residential Outdoor: 12,285; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area:
5 Architectural Coating Architectural Coating 12/23/2023 OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Site Preparation Rubber Tired Dozers 3 8.00 247 0.40
Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Grading Excavators 1 8.00 158 0.38
Grading Graders 1 8.00 187 0.41
Grading Rubber Tired Dozers 1 8.00 247 0.40
Grading Tractors/Loaders/Backhoes 3 8.00 97 0.37
Paving Pavers 2 8.00 130 0.42
Paving Paving Equipment 2 8.00 132 0.36
Paving Rollers 2 8.00 80 0.38
Building Construction Cranes 1 7.00 231 0.29
Building Construction Forklifts 3 8.00 89 0.20
Building Construction Generator Sets 1 8.00 84 0.74
Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Page 1918 of 4069 Agenda Item #6.4.

Page 5 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Winter Building Construction Welders 1 8.00 46 0.45
Architectural Coating Air Compressors 1 6.00 78 0.48
Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle
Class
Hauling
Vehicle
Class
Site Preparation 7 18.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Grading 6 20.00 2.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Paving 6 15.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Building Construction 9 55.00 11.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Architectural Coating 1 11.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Page 1919 of 4069 Agenda Item #6.4.

Page 6 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Winter

3.1 Mitigation Measures Construction
NOx CO SO2 Fugitive
PM10
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2
Water Exposed Area

3.2 Site Preparation - 2023
Unmitigated Construction On-Site
ROG NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM10
PM10
Total
Fugitive Dust 18.0663 0.0000 18.0663 9.9307 0.0000 9.9307 0.0000 0.0000 Off-Road 2.6595 27.5242 18.2443 0.0381 1.2660 1.2660 1.1647 1.1647 3,687.308 1 3,687.308
1 1.1926 3,717.121
9 Total 2.6595 27.5242 18.2443 0.0381 1.1926 3,717.121
9 18.0663 1.2660 19.3323 9.9307 1.1647 11.0954
SO2 Fugitive
PM10
Exhaust
PM10
3,687.308
1 3,687.308
1 PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0614 0.0402 0.4071 1.2000e0030.1479 9.0000e0040.1488 0.0392 8.3000e0040.0401 119.7975 119.7975 2.7200e003119.8655 Total 0.0614 0.0402 0.4071 1.2000e0032.7200e0030.1479 9.0000e- 119.8655 004

0.1488 0.0392 8.3000e0040.0401 119.7975 119.7975

Page 1920 of 4069 ends

Agenda Item #6.4.

Page 7 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Winter SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Fugitive Dust 8.1298 0.0000 8.1298 4.4688 0.0000 4.4688 0.0000 0.0000 Off-Road 2.6595 27.5242 18.2443 0.0381 1.2660 1.2660 1.1647 1.1647 0.0000 3,687.308 1 3,687.308
1 1.1926 3,717.121
9 Total 2.6595 27.5242 18.2443 0.0381 1.1926 3,717.121
9 8.1298 1.2660 9.3958 4.4688 1.1647 5.6336
SO2 Fugitive
PM10
Exhaust
PM10

0.0000 3,687.308
1 3,687.308
1 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0614 0.0402 0.4071 1.2000e0030.1479 9.0000e0040.1488 0.0392 8.3000e0040.0401 119.7975 119.7975 2.7200e003119.8655 Total 0.0614 0.0402 0.4071 1.2000e0032.7200e0030.1479 9.0000e- 119.8655 004

0.1488 0.0392 8.3000e0040.0401 119.7975 119.7975

Page 1921 of 4069 ends

Agenda Item #6.4.

Page 8 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Winter SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2

3.3 Grading - 2023
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Fugitive Dust 6.5523 0.0000 6.5523 3.3675 0.0000 3.3675 0.0000 0.0000 Off-Road 1.7109 17.9359 14.7507 0.0297 0.7749 0.7749 0.7129 0.7129 2,872.691 0 2,872.691
0 0.9291 2,895.918
2 Total 1.7109 17.9359 14.7507 0.0297 0.9291 2,895.918
2 6.5523 0.7749 7.3273 3.3675 0.7129 4.0804
SO2 Fugitive
PM10
Exhaust
PM10
2,872.691
0 2,872.691
0 PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.9000e0030.1578 0.0487 5.1000e0040.0135 1.9000e0040.0137 3.8900e0031.8000e0044.0700e00353.9148 53.9148 2.5900e00353.9796 Worker 0.0682 0.0446 0.4524 1.3400e0030.1643 1.0000e0030.1653 0.0436 9.2000e0040.0445 133.1084 133.1084 3.0200e003133.1839 Total 0.0731 0.2024 0.5011 1.8500e0035.6100e0030.1778 1.1900e- 187.1635 003

0.1790 0.0475 1.1000e0030.0486 187.0231 187.0231

Page 1922 of 4069 ends

Agenda Item #6.4.

Page 9 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Winter SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Fugitive Dust 2.9486 0.0000 2.9486 1.5154 0.0000 1.5154 0.0000 0.0000 Off-Road 1.7109 17.9359 14.7507 0.0297 0.7749 0.7749 0.7129 0.7129 0.0000 2,872.691 0 2,872.691
0 0.9291 2,895.918
2 Total 1.7109 17.9359 14.7507 0.0297 0.9291 2,895.918
2 2.9486 0.7749 3.7235 1.5154 0.7129 2.2283
SO2 Fugitive
PM10
Exhaust
PM10

0.0000 2,872.691
0 2,872.691
0 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.9000e0030.1578 0.0487 5.1000e0040.0135 1.9000e0040.0137 3.8900e0031.8000e0044.0700e00353.9148 53.9148 2.5900e00353.9796 Worker 0.0682 0.0446 0.4524 1.3400e0030.1643 1.0000e0030.1653 0.0436 9.2000e0040.0445 133.1084 133.1084 3.0200e003133.1839 Total 0.0731 0.2024 0.5011 1.8500e0035.6100e0030.1778 1.1900e- 187.1635 003

0.1790 0.0475 1.1000e0030.0486 187.0231 187.0231

Page 1923 of 4069 ends

Agenda Item #6.4.

Page 10 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Winter SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2

3.4 Paving - 2023
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 1.0327 10.1917 14.5842 0.0228 0.5102 0.5102 0.4694 0.4694 2,207.584 1 2,207.584
1 0.7140 2,225.433
6 Paving 0.7205 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.7532 10.1917 14.5842 0.0228 0.7140 2,225.433
6 0.5102 0.5102 0.4694 0.4694
SO2 Fugitive
PM10
Exhaust
PM10
2,207.584
1 2,207.584
1 PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0511 0.0335 0.3393 1.0000e0030.1232 7.5000e0040.1240 0.0327 6.9000e0040.0334 99.8313 99.8313 2.2700e00399.8880 Total 0.0511 0.0335 0.3393 1.0000e0032.2700e0030.1232 7.5000e- 99.8880 004

0.1240 0.0327 6.9000e0040.0334 99.8313 99.8313

Page 1924 of 4069 ends

Agenda Item #6.4.

Page 11 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Winter SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 1.0327 10.1917 14.5842 0.0228 0.5102 0.5102 0.4694 0.4694 0.0000 2,207.584 1 2,207.584
1 0.7140 2,225.433
6 Paving 0.7205 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.7532 10.1917 14.5842 0.0228 0.7140 2,225.433
6 0.5102 0.5102 0.4694 0.4694
SO2 Fugitive
PM10
Exhaust
PM10

0.0000 2,207.584
1 2,207.584
1 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0511 0.0335 0.3393 1.0000e0030.1232 7.5000e0040.1240 0.0327 6.9000e0040.0334 99.8313 99.8313 2.2700e00399.8880 Total 0.0511 0.0335 0.3393 1.0000e0032.2700e0030.1232 7.5000e- 99.8880 004

0.1240 0.0327 6.9000e0040.0334 99.8313 99.8313

Page 1925 of 4069 ends

Agenda Item #6.4.

Page 12 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Winter SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2

3.5 Building Construction - 2023
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 1.5728 14.3849 16.2440 0.0269 0.6997 0.6997 0.6584 0.6584 2,555.209 9 2,555.209
9 0.6079 2,570.406
1 Total 1.5728 14.3849 16.2440 0.0269 0.6079 2,570.406
1 0.6997 0.6997 0.6584 0.6584
SO2 Fugitive
PM10
Exhaust
PM10
2,555.209
9 2,555.209
9 PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0270 0.8679 0.2680 2.8000e0030.0744 1.0400e0030.0754 0.0214 1.0000e0030.0224 296.5311 296.5311 0.0143 296.8876 Worker 0.1875 0.1227 1.2440 3.6700e0030.4518 2.7600e0030.4546 0.1198 2.5400e0030.1224 366.0480 366.0480 8.3100e003366.2558 Total 0.2145 0.9906 1.5120 6.4700e0030.5262 3.8000e- 0.0226 663.1434 003

0.5300 0.1413 3.5400e0030.1448 662.5791 662.5791

Page 1926 of 4069 ends

Agenda Item #6.4.

Page 13 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Winter SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 1.5728 14.3849 16.2440 0.0269 0.6997 0.6997 0.6584 0.6584 0.0000 2,555.209 9 2,555.209
9 0.6079 2,570.406
1 Total 1.5728 14.3849 16.2440 0.0269 0.6079 2,570.406
1 0.6997 0.6997 0.6584 0.6584
SO2 Fugitive
PM10
Exhaust
PM10

0.0000 2,555.209
9 2,555.209
9 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0270 0.8679 0.2680 2.8000e0030.0744 1.0400e0030.0754 0.0214 1.0000e0030.0224 296.5311 296.5311 0.0143 296.8876 Worker 0.1875 0.1227 1.2440 3.6700e0030.4518 2.7600e0030.4546 0.1198 2.5400e0030.1224 366.0480 366.0480 8.3100e003366.2558 Total 0.2145 0.9906 1.5120 6.4700e0030.5262 3.8000e- 0.0226 663.1434 003

0.5300 0.1413 3.5400e0030.1448 662.5791 662.5791

Page 1927 of 4069 ends

Agenda Item #6.4.

Page 14 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Winter SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2

3.6 Architectural Coating - 2023
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 17.8088 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1917 1.3030 1.8111 2.9700e0030.0708 0.0708 0.0708 0.0708 281.4481 281.4481 0.0168 281.8690 Total 18.0005 1.3030 1.8111 2.9700e0030.0708 0.0708 0.0708 0.0708 0.0168 281.8690 SO2 Fugitive
PM10
Exhaust
PM10
281.4481 281.4481
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0375 0.0245 0.2488 7.3000e0040.0904 5.5000e0040.0909 0.0240 5.1000e0040.0245 73.2096 73.2096 1.6600e00373.2512 Total 0.0375 0.0245 0.2488 7.3000e0041.6600e0030.0904 5.5000e- 73.2512 004

0.0909 0.0240 5.1000e0040.0245 73.2096 73.2096

Page 1928 of 4069 ends

Agenda Item #6.4.

Page 15 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Winter SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 17.8088 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1917 1.3030 1.8111 2.9700e0030.0708 0.0708 0.0708 0.0708 0.0000 281.4481 281.4481 0.0168 281.8690 Total 18.0005 1.3030 1.8111 2.9700e0030.0708 0.0708 0.0708 0.0708 0.0168 281.8690 SO2 Fugitive
PM10
Exhaust
PM10

0.0000 281.4481 281.4481
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0375 0.0245 0.2488 7.3000e0040.0904 5.5000e0040.0909 0.0240 5.1000e0040.0245 73.2096 73.2096 1.6600e00373.2512 Total 0.0375 0.0245 0.2488 7.3000e0041.6600e0030.0904 5.5000e- 73.2512 004

0.0909 0.0240 5.1000e0040.0245 73.2096 73.2096

Page 1929 of 4069 ends

Agenda Item #6.4.

Page 16 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Winter SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2

3.6 Architectural Coating - 2024
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 17.8088 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1808 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 281.4481 281.4481 0.0159 281.8443 Total 17.9896 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 0.0159 281.8443 SO2 Fugitive
PM10
Exhaust
PM10
281.4481 281.4481
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0350 0.0220 0.2284 7.1000e0040.0904 5.4000e0040.0909 0.0240 4.9000e0040.0245 70.2892 70.2892 1.4800e00370.3263 Total 0.0350 0.0220 0.2284 7.1000e0041.4800e0030.0904 5.4000e- 70.3263 004

0.0909 0.0240 4.9000e0040.0245 70.2892 70.2892

Page 1930 of 4069 ends

Agenda Item #6.4.

Page 17 of 17 ends

Hunter Subdivision Project - First Year - Napa County, Winter SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 17.8088 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1808 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 0.0000 281.4481 281.4481 0.0159 281.8443 Total 17.9896 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 0.0159 281.8443 SO2 Fugitive
PM10
Exhaust
PM10

0.0000 281.4481 281.4481
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0350 0.0220 0.2284 7.1000e0040.0904 5.4000e0040.0909 0.0240 4.9000e0040.0245 70.2892 70.2892 1.4800e00370.3263 Total 0.0350 0.0220 0.2284 7.1000e0041.4800e0030.0904 5.4000e- 70.3263 004

0.0909 0.0240 4.9000e0040.0245 70.2892 70.2892

Page 1931 of 4069 ends

Agenda Item #6.4.

Page 1 of 8 ends

Hunter Subdivision Project - Second Year - Napa County, Annual CalEEMod Version: CalEEMod.2016.3.2
Date: 3/3/2021 9:42 AM
Hunter Subdivision Project - Second Year
Napa County, Annual

1.0 Project Characteristics

1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population Apartments Low Rise 2.00 Dwelling Unit 0.13 2,000.00 5
Single Family Housing 9.00 Dwelling Unit 2.92 16,200.00 22

1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 3.6 Precipitation Freq (Days) 64 Climate Zone 4 Operational Year 2025
Utility Company Pacific Gas & Electric Company
CO2 Intensity
(lb/MWhr)
641.35 CH4 Intensity
(lb/MWhr)

0.029 N2O Intensity
(lb/MWhr)

0.006

1.3 User Entered Comments & Non-Default Data
Project Characteristics - Hunter Subdivision Project. BAAQMD.

Land Use - Construction of 9 SF residences and 2 ADUs. Updated population per City of St Helena avg household size per BayAreaCensus.

Construction Phase - Assumed project would begin construction Spring 2024 (March), with completion in November 2024.

Off-road Equipment - Default equipment assumed.

Off-road Equipment - Default equipment assumed.

Off-road Equipment - Default equipment assumed.

Trips and VMT - Assumed same trips for construction of all res dwelling units.

Grading - Assumed site would be balanced. Page 1932 of 4069 Agenda Item #6.4.

Page 2 of 8 ends

Hunter Subdivision Project - Second Year - Napa County, Annual Table Name Column Name Default Value New Value
tblConstructionPhase NumDays 18.00 20.00
tblConstructionPhase NumDays 230.00 150.00
tblConstructionPhase PhaseEndDate 2/26/2025 11/8/2024
tblConstructionPhase PhaseEndDate 1/31/2025 10/11/2024
tblConstructionPhase PhaseStartDate 2/1/2025 10/12/2024 tblLandUse Population 6.00 5.00
tblLandUse Population 26.00 22.00
tblTripsAndVMT VendorTripNumber 1.00 11.00

5.00 55.00
tblTripsAndVMT WorkerTripNumber 1.00 11.00
tblTripsAndVMT WorkerTripNumber

Page 1933 of 4069 ends

Agenda Item #6.4.

Page 3 of 8 ends

Hunter Subdivision Project - Second Year - Napa County, Annual NOx CO SO2 Fugitive
PM10
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2

2.0 Emissions Summary

2.1 Overall Construction
Unmitigated Construction
ROG NBio- CO2 Total CO2 CH4 N2O CO2e
Year tons/yr MT/yr
Exhaust
PM10
PM10
Total
2024 0.2544 1.0927 1.3333 2.5400e0030.0389 0.0469 0.0858 0.0105 0.0441 0.0546 0.0000 221.6110 221.6110 0.0427 0.0000 222.6788 Maximum 0.2544 1.0927 1.3333 2.5400e0030.0389 0.0469 0.0858 0.0105 0.0441 0.0546 0.0427 0.0000 222.6788 SO2 Fugitive
PM10
Exhaust
PM10

0.0000 221.6110 221.6110
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction
ROG NOx CO Total CO2 CH4 N2O CO2e
Year tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
2024 0.2544 1.0927 1.3333 2.5400e0030.0389 0.0469 0.0858 0.0105 0.0441 0.0546 0.0000 221.6108 221.6108 0.0427 0.0000 222.6786 Maximum 0.2544 1.0927 1.3333 2.5400e0030.0389 0.0469 0.0858 0.0105 0.0441 0.0546 0.0000 221.6108 221.6108 0.0427 0.0000 222.6786 ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 1934 of 4069 ends

Agenda Item #6.4.

Page 4 of 8 ends

Hunter Subdivision Project - Second Year - Napa County, Annual

3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date End Date Num Days
Week
Num Days Phase Description
1 Building Construction Building Construction 3/18/2024 10/11/2024 5 150 2 Architectural Coating Architectural Coating 10/12/2024 11/8/2024 5 20 Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
Residential Indoor: 36,855; Residential Outdoor: 12,285; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Building Construction Cranes 1 7.00 231 0.29
Building Construction Forklifts 3 8.00 89 0.20
Building Construction Generator Sets 1 8.00 84 0.74
Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Building Construction Welders 1 8.00 46 0.45
Architectural Coating Air Compressors 1 6.00 78 0.48
Hauling
Vehicle
Class
Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number

10.80 Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle
Class
Architectural Coating 1 11.00 0.00 0.00
Building Construction 9 55.00 11.00 0.00

20.00 LD_Mix HDT_Mix HHDT

7.30 20.00 LD_Mix HDT_Mix HHDT

10.80 7.30

Page 1935 of 4069 ends

Agenda Item #6.4.

Page 5 of 8 ends

Hunter Subdivision Project - Second Year - Napa County, Annual NOx CO SO2 Fugitive
PM10
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2

3.1 Mitigation Measures Construction

3.2 Building Construction - 2024
Unmitigated Construction On-Site
ROG NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM10
PM10
Total
Off-Road 0.1104 1.0083 1.2125 2.0200e0030.0460 0.0460 0.0433 0.0433 0.0000 173.8868 173.8868 0.0411 0.0000 174.9148 Total 0.1104 1.0083 1.2125 2.0200e0030.0460 0.0460 0.0433 0.0433 0.0411 0.0000 174.9148 SO2 Fugitive
PM10
Exhaust
PM10

0.0000 173.8868 173.8868
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.8600e0030.0646 0.0175 2.1000e0045.4100e0037.0000e0055.4800e0031.5600e0037.0000e0051.6300e0030.0000 20.3524 20.3524 9.3000e0040.0000 20.3757 Worker 0.0119 7.4200e0030.0829 2.7000e0040.0326 2.0000e0040.0328 8.6700e0031.9000e0048.8600e0030.0000 24.1739 24.1739 5.0000e0040.0000 24.1865 Total 0.0138 0.0720 0.1005 4.8000e0041.4300e0030.0380 2.7000e- 0.0000 44.5622 004

0.0383 0.0102 2.6000e0040.0105 0.0000 44.5263 44.5263

Page 1936 of 4069 ends

Agenda Item #6.4.

Page 6 of 8 ends

Hunter Subdivision Project - Second Year - Napa County, Annual SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 0.1104 1.0083 1.2125 2.0200e0030.0460 0.0460 0.0433 0.0433 0.0000 173.8866 173.8866 0.0411 0.0000 174.9146 Total 0.1104 1.0083 1.2125 2.0200e0030.0460 0.0460 0.0433 0.0433 0.0411 0.0000 174.9146 SO2 Fugitive
PM10
Exhaust
PM10

0.0000 173.8866 173.8866
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.8600e0030.0646 0.0175 2.1000e0045.4100e0037.0000e0055.4800e0031.5600e0037.0000e0051.6300e0030.0000 20.3524 20.3524 9.3000e0040.0000 20.3757 Worker 0.0119 7.4200e0030.0829 2.7000e0040.0326 2.0000e0040.0328 8.6700e0031.9000e0048.8600e0030.0000 24.1739 24.1739 5.0000e0040.0000 24.1865 Total 0.0138 0.0720 0.1005 4.8000e0041.4300e0030.0380 2.7000e- 0.0000 44.5622 004

0.0383 0.0102 2.6000e0040.0105 0.0000 44.5263 44.5263

Page 1937 of 4069 ends

Agenda Item #6.4.

Page 7 of 8 ends

Hunter Subdivision Project - Second Year - Napa County, Annual SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2

3.3 Architectural Coating - 2024
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 0.1281 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 1.8100e0030.0122 0.0181 3.0000e0056.1000e0046.1000e0046.1000e0046.1000e0040.0000 2.5533 2.5533 1.4000e0040.0000 2.5569 Total 0.1299 0.0122 0.0181 3.0000e0051.4000e0046.1000e- 0.0000 2.5569 004

6.1000e0046.1000e0046.1000e004
SO2 Fugitive
PM10
Exhaust
PM10

0.0000 2.5533 2.5533
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 3.2000e0042.0000e0042.2100e0031.0000e0058.7000e0041.0000e0058.7000e0042.3000e0040.0000 2.4000e0040.0000 0.6446 0.6446 1.0000e0050.0000 0.6450 Total 3.2000e0042.0000e0042.2100e0031.0000e0051.0000e0058.7000e- 0.0000 0.6450 004

1.0000e0058.7000e0042.3000e0040.0000 2.4000e0040.0000 0.6446 0.6446

Page 1938 of 4069 ends

Agenda Item #6.4.

Page 8 of 8 ends

Hunter Subdivision Project - Second Year - Napa County, Annual SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 0.1281 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 1.8100e0030.0122 0.0181 3.0000e0056.1000e0046.1000e0046.1000e0046.1000e0040.0000 2.5533 2.5533 1.4000e0040.0000 2.5568 Total 0.1299 0.0122 0.0181 3.0000e0051.4000e0046.1000e- 0.0000 2.5568 004

6.1000e0046.1000e0046.1000e004
SO2 Fugitive
PM10
Exhaust
PM10

0.0000 2.5533 2.5533
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 3.2000e0042.0000e0042.2100e0031.0000e0058.7000e0041.0000e0058.7000e0042.3000e0040.0000 2.4000e0040.0000 0.6446 0.6446 1.0000e0050.0000 0.6450 Total 3.2000e0042.0000e0042.2100e0031.0000e0051.0000e0058.7000e- 0.0000 0.6450 004

1.0000e0058.7000e0042.3000e0040.0000 2.4000e0040.0000 0.6446 0.6446

Page 1939 of 4069 ends

Agenda Item #6.4.

Page 1 of 8 ends

Hunter Subdivision Project - Second Year - Napa County, Summer CalEEMod Version: CalEEMod.2016.3.2
Date: 3/3/2021 9:46 AM
Hunter Subdivision Project - Second Year
Napa County, Summer

1.0 Project Characteristics

1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population Apartments Low Rise 2.00 Dwelling Unit 0.13 2,000.00 5
Single Family Housing 9.00 Dwelling Unit 2.92 16,200.00 22

1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 3.6 Precipitation Freq (Days) 64 Climate Zone 4 Operational Year 2025
Utility Company Pacific Gas & Electric Company
CO2 Intensity
(lb/MWhr)
641.35 CH4 Intensity
(lb/MWhr)

0.029 N2O Intensity
(lb/MWhr)

0.006

1.3 User Entered Comments & Non-Default Data
Project Characteristics - Hunter Subdivision Project. BAAQMD.

Land Use - Construction of 9 SF residences and 2 ADUs. Updated population per City of St Helena avg household size per BayAreaCensus.

Construction Phase - Assumed project would begin construction Spring 2024 (March), with completion in November 2024.

Off-road Equipment - Default equipment assumed.

Off-road Equipment - Default equipment assumed.

Off-road Equipment - Default equipment assumed.

Trips and VMT - Assumed same trips for construction of all res dwelling units.

Grading - Assumed site would be balanced. Page 1940 of 4069 Agenda Item #6.4.

Page 2 of 8 ends

Hunter Subdivision Project - Second Year - Napa County, Summer Table Name Column Name Default Value New Value
tblConstructionPhase NumDays 18.00 20.00
tblConstructionPhase NumDays 230.00 150.00
tblConstructionPhase PhaseEndDate 2/26/2025 11/8/2024
tblConstructionPhase PhaseEndDate 1/31/2025 10/11/2024
tblConstructionPhase PhaseStartDate 2/1/2025 10/12/2024 tblLandUse Population 6.00 5.00
tblLandUse Population 26.00 22.00
tblTripsAndVMT VendorTripNumber 1.00 11.00

5.00 55.00
tblTripsAndVMT WorkerTripNumber 1.00 11.00
tblTripsAndVMT WorkerTripNumber

Page 1941 of 4069 ends

Agenda Item #6.4.

Page 3 of 8 ends

Hunter Subdivision Project - Second Year - Napa County, Summer NOx CO SO2 Fugitive
PM10
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2

2.0 Emissions Summary

2.1 Overall Construction (Maximum Daily Emission)
Unmitigated Construction
ROG NBio- CO2 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
Exhaust
PM10
PM10
Total
2024 13.0257 14.3844 17.5847 0.0336 0.5262 0.6170 1.1432 0.1413 0.5803 0.7216 0.0000 3,237.850 2 3,237.850
2 0.6255 0.0000 3,253.486
6 Maximum 13.0257 14.3844 17.5847 0.0336 0.6255 0.0000 3,253.486 6 0.5262 0.6170 1.1432 0.1413 0.5803 0.7216
SO2 Fugitive
PM10
Exhaust
PM10

0.0000 3,237.850
2 3,237.850
2 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction
ROG NOx CO Total CO2 CH4 N2O CO2e
Year lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
2024 13.0257 14.3844 17.5847 0.0336 0.5262 0.6170 1.1432 0.1413 0.5803 0.7216 0.0000 3,237.850 2 3,237.850
2 0.6255 0.0000 3,253.486
6 Maximum 13.0257 14.3844 17.5847 0.0336 0.5262 0.6170 1.1432 0.1413 0.5803 0.7216 0.0000 3,237.850 2 3,237.850
2 0.6255 0.0000 3,253.486
6 ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 1942 of 4069 ends

Agenda Item #6.4.

Page 4 of 8 ends

Hunter Subdivision Project - Second Year - Napa County, Summer

3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date End Date Num Days
Week
Num Days Phase Description
1 Building Construction Building Construction 3/18/2024 10/11/2024 5 150 2 Architectural Coating Architectural Coating 10/12/2024 11/8/2024 5 20 Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
Residential Indoor: 36,855; Residential Outdoor: 12,285; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area:

OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Building Construction Cranes 1 7.00 231 0.29
Building Construction Forklifts 3 8.00 89 0.20
Building Construction Generator Sets 1 8.00 84 0.74
Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Building Construction Welders 1 8.00 46 0.45
Architectural Coating Air Compressors 1 6.00 78 0.48
Hauling
Vehicle
Class
Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number

10.80 Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle
Class
Architectural Coating 1 11.00 0.00 0.00
Building Construction 9 55.00 11.00 0.00

20.00 LD_Mix HDT_Mix HHDT

7.30 20.00 LD_Mix HDT_Mix HHDT

10.80 7.30

Page 1943 of 4069 ends

Agenda Item #6.4.

Page 5 of 8 ends

Hunter Subdivision Project - Second Year - Napa County, Summer NOx CO SO2 Fugitive
PM10
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2

3.1 Mitigation Measures Construction

3.2 Building Construction - 2024
Unmitigated Construction On-Site
ROG NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM10
PM10
Total
Off-Road 1.4716 13.4438 16.1668 0.0270 0.6133 0.6133 0.5769 0.5769 2,555.698 9 2,555.698
9 0.6044 2,570.807
7 Total 1.4716 13.4438 16.1668 0.0270 0.6044 2,570.807
7 0.6133 0.6133 0.5769 0.5769
SO2 Fugitive
PM10
Exhaust
PM10
2,555.698
9 2,555.698
9 PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0242 0.8537 0.2199 2.8500e0030.0744 9.8000e0040.0754 0.0214 9.3000e0040.0224 302.2028 302.2028 0.0132 302.5328 Worker 0.1661 0.0869 1.1980 3.8100e0030.4518 2.6900e0030.4545 0.1198 2.4700e0030.1223 379.9485 379.9485 7.9000e003380.1461 Total 0.1904 0.9406 1.4178 6.6600e0030.5262 3.6700e- 0.0211 682.6789 003

0.5299 0.1413 3.4000e0030.1447 682.1513 682.1513

Page 1944 of 4069 ends

Agenda Item #6.4.

Page 6 of 8 ends

Hunter Subdivision Project - Second Year - Napa County, Summer SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 1.4716 13.4438 16.1668 0.0270 0.6133 0.6133 0.5769 0.5769 0.0000 2,555.698 9 2,555.698
9 0.6044 2,570.807
7 Total 1.4716 13.4438 16.1668 0.0270 0.6044 2,570.807
7 0.6133 0.6133 0.5769 0.5769
SO2 Fugitive
PM10
Exhaust
PM10

0.0000 2,555.698
9 2,555.698
9 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0242 0.8537 0.2199 2.8500e0030.0744 9.8000e0040.0754 0.0214 9.3000e0040.0224 302.2028 302.2028 0.0132 302.5328 Worker 0.1661 0.0869 1.1980 3.8100e0030.4518 2.6900e0030.4545 0.1198 2.4700e0030.1223 379.9485 379.9485 7.9000e003380.1461 Total 0.1904 0.9406 1.4178 6.6600e0030.5262 3.6700e- 0.0211 682.6789 003

0.5299 0.1413 3.4000e0030.1447 682.1513 682.1513

Page 1945 of 4069 ends

Agenda Item #6.4.

Page 7 of 8 ends

Hunter Subdivision Project - Second Year - Napa County, Summer SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2

3.3 Architectural Coating - 2024
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 12.8117 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1808 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 281.4481 281.4481 0.0159 281.8443 Total 12.9925 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 0.0159 281.8443 SO2 Fugitive
PM10
Exhaust
PM10
281.4481 281.4481
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0332 0.0174 0.2396 7.6000e0040.0904 5.4000e0040.0909 0.0240 4.9000e0040.0245 75.9897 75.9897 1.5800e00376.0292 Total 0.0332 0.0174 0.2396 7.6000e0041.5800e0030.0904 5.4000e- 76.0292 004

0.0909 0.0240 4.9000e0040.0245 75.9897 75.9897

Page 1946 of 4069 ends

Agenda Item #6.4.

Page 8 of 8 ends

Hunter Subdivision Project - Second Year - Napa County, Summer SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 12.8117 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1808 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 0.0000 281.4481 281.4481 0.0159 281.8443 Total 12.9925 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 0.0159 281.8443 SO2 Fugitive
PM10
Exhaust
PM10

0.0000 281.4481 281.4481
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0332 0.0174 0.2396 7.6000e0040.0904 5.4000e0040.0909 0.0240 4.9000e0040.0245 75.9897 75.9897 1.5800e00376.0292 Total 0.0332 0.0174 0.2396 7.6000e0041.5800e0030.0904 5.4000e- 76.0292 004

0.0909 0.0240 4.9000e0040.0245 75.9897 75.9897

Page 1947 of 4069 ends

Agenda Item #6.4.

Page 1 of 8 ends

Hunter Subdivision Project - Second Year - Napa County, Winter CalEEMod Version: CalEEMod.2016.3.2
Date: 3/3/2021 9:47 AM
Hunter Subdivision Project - Second Year
Napa County, Winter

1.0 Project Characteristics

1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population Apartments Low Rise 2.00 Dwelling Unit 0.13 2,000.00 5
Single Family Housing 9.00 Dwelling Unit 2.92 16,200.00 22

1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 3.6 Precipitation Freq (Days) 64 Climate Zone 4 Operational Year 2025
Utility Company Pacific Gas & Electric Company
CO2 Intensity
(lb/MWhr)
641.35 CH4 Intensity
(lb/MWhr)

0.029 N2O Intensity
(lb/MWhr)

0.006

1.3 User Entered Comments & Non-Default Data
Project Characteristics - Hunter Subdivision Project. BAAQMD.

Land Use - Construction of 9 SF residences and 2 ADUs. Updated population per City of St Helena avg household size per BayAreaCensus.

Construction Phase - Assumed project would begin construction Spring 2024 (March), with completion in November 2024.

Off-road Equipment - Default equipment assumed.

Off-road Equipment - Default equipment assumed.

Off-road Equipment - Default equipment assumed.

Trips and VMT - Assumed same trips for construction of all res dwelling units.

Grading - Assumed site would be balanced. Page 1948 of 4069 Agenda Item #6.4.

Page 2 of 8 ends

Hunter Subdivision Project - Second Year - Napa County, Winter Table Name Column Name Default Value New Value
tblConstructionPhase NumDays 18.00 20.00
tblConstructionPhase NumDays 230.00 150.00
tblConstructionPhase PhaseEndDate 2/26/2025 11/8/2024
tblConstructionPhase PhaseEndDate 1/31/2025 10/11/2024
tblConstructionPhase PhaseStartDate 2/1/2025 10/12/2024 tblLandUse Population 6.00 5.00
tblLandUse Population 26.00 22.00
tblTripsAndVMT VendorTripNumber 1.00 11.00

5.00 55.00
tblTripsAndVMT WorkerTripNumber 1.00 11.00
tblTripsAndVMT WorkerTripNumber

Page 1949 of 4069 ends

Agenda Item #6.4.

Page 3 of 8 ends

Hunter Subdivision Project - Second Year - Napa County, Winter NOx CO SO2 Fugitive
PM10
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2

2.0 Emissions Summary

2.1 Overall Construction (Maximum Daily Emission)
Unmitigated Construction
ROG NBio- CO2 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
Exhaust
PM10
PM10
Total
2024 13.0275 14.4132 17.5599 0.0333 0.5262 0.6170 1.1432 0.1413 0.5804 0.7216 0.0000 3,202.033 3 3,202.033
3 0.6261 0.0000 3,217.684
9 Maximum 13.0275 14.4132 17.5599 0.0333 0.6261 0.0000 3,217.684 9 0.5262 0.6170 1.1432 0.1413 0.5804 0.7216
SO2 Fugitive
PM10
Exhaust
PM10

0.0000 3,202.033
3 3,202.033
3 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction
ROG NOx CO Total CO2 CH4 N2O CO2e
Year lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
2024 13.0275 14.4132 17.5599 0.0333 0.5262 0.6170 1.1432 0.1413 0.5804 0.7216 0.0000 3,202.033 3 3,202.033
3 0.6261 0.0000 3,217.684
9 Maximum 13.0275 14.4132 17.5599 0.0333 0.5262 0.6170 1.1432 0.1413 0.5804 0.7216 0.0000 3,202.033 3 3,202.033
3 0.6261 0.0000 3,217.684
9 ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 1950 of 4069 ends

Agenda Item #6.4.

Page 4 of 8 ends

Hunter Subdivision Project - Second Year - Napa County, Winter

3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date End Date Num Days
Week
Num Days Phase Description
1 Building Construction Building Construction 3/18/2024 10/11/2024 5 150 2 Architectural Coating Architectural Coating 10/12/2024 11/8/2024 5 20 Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
Residential Indoor: 36,855; Residential Outdoor: 12,285; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area:

OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Building Construction Cranes 1 7.00 231 0.29
Building Construction Forklifts 3 8.00 89 0.20
Building Construction Generator Sets 1 8.00 84 0.74
Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Building Construction Welders 1 8.00 46 0.45
Architectural Coating Air Compressors 1 6.00 78 0.48
Hauling
Vehicle
Class
Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number

10.80 Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle
Class
Architectural Coating 1 11.00 0.00 0.00
Building Construction 9 55.00 11.00 0.00

20.00 LD_Mix HDT_Mix HHDT

7.30 20.00 LD_Mix HDT_Mix HHDT

10.80 7.30

Page 1951 of 4069 ends

Agenda Item #6.4.

Page 5 of 8 ends

Hunter Subdivision Project - Second Year - Napa County, Winter NOx CO SO2 Fugitive
PM10
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2

3.1 Mitigation Measures Construction

3.2 Building Construction - 2024
Unmitigated Construction On-Site
ROG NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM10
PM10
Total
Off-Road 1.4716 13.4438 16.1668 0.0270 0.6133 0.6133 0.5769 0.5769 2,555.698 9 2,555.698
9 0.6044 2,570.807
7 Total 1.4716 13.4438 16.1668 0.0270 0.6044 2,570.807
7 0.6133 0.6133 0.5769 0.5769
SO2 Fugitive
PM10
Exhaust
PM10
2,555.698
9 2,555.698
9 PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0258 0.8592 0.2510 2.7800e0030.0744 1.0200e0030.0754 0.0214 9.7000e0040.0224 294.8883 294.8883 0.0143 295.2457 Worker 0.1752 0.1102 1.1422 3.5300e0030.4518 2.6900e0030.4545 0.1198 2.4700e0030.1223 351.4462 351.4462 7.4200e003351.6316 Total 0.2010 0.9694 1.3931 6.3100e0030.5262 3.7100e- 0.0217 646.8772 003

0.5299 0.1413 3.4400e0030.1447 646.3344 646.3344

Page 1952 of 4069 ends

Agenda Item #6.4.

Page 6 of 8 ends

Hunter Subdivision Project - Second Year - Napa County, Winter SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 1.4716 13.4438 16.1668 0.0270 0.6133 0.6133 0.5769 0.5769 0.0000 2,555.698 9 2,555.698
9 0.6044 2,570.807
7 Total 1.4716 13.4438 16.1668 0.0270 0.6044 2,570.807
7 0.6133 0.6133 0.5769 0.5769
SO2 Fugitive
PM10
Exhaust
PM10

0.0000 2,555.698
9 2,555.698
9 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0258 0.8592 0.2510 2.7800e0030.0744 1.0200e0030.0754 0.0214 9.7000e0040.0224 294.8883 294.8883 0.0143 295.2457 Worker 0.1752 0.1102 1.1422 3.5300e0030.4518 2.6900e0030.4545 0.1198 2.4700e0030.1223 351.4462 351.4462 7.4200e003351.6316 Total 0.2010 0.9694 1.3931 6.3100e0030.5262 3.7100e- 0.0217 646.8772 003

0.5299 0.1413 3.4400e0030.1447 646.3344 646.3344

Page 1953 of 4069 ends

Agenda Item #6.4.

Page 7 of 8 ends

Hunter Subdivision Project - Second Year - Napa County, Winter SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2

3.3 Architectural Coating - 2024
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 12.8117 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1808 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 281.4481 281.4481 0.0159 281.8443 Total 12.9925 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 0.0159 281.8443 SO2 Fugitive
PM10
Exhaust
PM10
281.4481 281.4481
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0350 0.0220 0.2284 7.1000e0040.0904 5.4000e0040.0909 0.0240 4.9000e0040.0245 70.2892 70.2892 1.4800e00370.3263 Total 0.0350 0.0220 0.2284 7.1000e0041.4800e0030.0904 5.4000e- 70.3263 004

0.0909 0.0240 4.9000e0040.0245 70.2892 70.2892

Page 1954 of 4069 ends

Agenda Item #6.4.

Page 8 of 8 ends

Hunter Subdivision Project - Second Year - Napa County, Winter SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 12.8117 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1808 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 0.0000 281.4481 281.4481 0.0159 281.8443 Total 12.9925 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 0.0159 281.8443 SO2 Fugitive
PM10
Exhaust
PM10

0.0000 281.4481 281.4481
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0350 0.0220 0.2284 7.1000e0040.0904 5.4000e0040.0909 0.0240 4.9000e0040.0245 70.2892 70.2892 1.4800e00370.3263 Total 0.0350 0.0220 0.2284 7.1000e0041.4800e0030.0904 5.4000e- 70.3263 004

0.0909 0.0240 4.9000e0040.0245 70.2892 70.2892

Page 1955 of 4069 ends

Agenda Item #6.4.

Page 1 of 10 ends

Hunter Subdivision Project - Third Year - Napa County, Annual Off-road Equipment - Default equipment assumed.

Trips and VMT - Assumed same trips for construction of all res dwelling units.

1.3 User Entered Comments & Non-Default Data
Project Characteristics - Hunter Subdivision Project. BAAQMD.

Land Use - Construction of 9 SF residences, 2 ADUs, and 25 low income units. Updated population per City of St Helena avg household size per BayAreaCensus.

Construction Phase - Assumed project would begin construction Spring 2025 (March), with completion in February 2026.

Off-road Equipment - Default equipment assumed.

Off-road Equipment - Default equipment assumed.

CO2 Intensity
(lb/MWhr)
641.35 CH4 Intensity
(lb/MWhr)

0.029 N2O Intensity
(lb/MWhr)

0.006
64 Climate Zone 4 Operational Year 2026
Utility Company Pacific Gas & Electric Company

1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 3.6 Precipitation Freq (Days) Single Family Housing 9.00 Dwelling Unit 2.92 16,200.00 22 Condo/Townhouse 25.00 Dwelling Unit 1.56 25,000.00 62
Floor Surface Area Population
Apartments Low Rise 2.00 Dwelling Unit 0.13 2,000.00 5

1.0 Project Characteristics

1.1 Land Usage
Land Uses Size Metric Lot Acreage
CalEEMod Version: CalEEMod.2016.3.2
Date: 3/3/2021 9:57 AM
Hunter Subdivision Project - Third Year
Napa County, Annual

Page 1956 of 4069 ends

Agenda Item #6.4.

Page 2 of 10 ends

Hunter Subdivision Project - Third Year - Napa County, Annual tblTripsAndVMT WorkerTripNumber 23.00 55.00
tblTripsAndVMT WorkerTripNumber 5.00 11.00
tblLandUse Population 26.00 22.00
tblTripsAndVMT VendorTripNumber 4.00 11.00
tblLandUse Population 6.00 5.00
tblLandUse Population 72.00 62.00
Table Name Column Name Default Value New Value
Grading - Assumed site would be balanced. Page 1957 of 4069 Agenda Item #6.4.

Page 3 of 10 ends

Hunter Subdivision Project - Third Year - Napa County, Annual

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction

0.00 0.00 0.00 0.00
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
ROG NOx CO SO2 Fugitive Bio- CO2
PM10
Maximum 0.3227 1.3947 1.8018 3.4500e- 0.0527 0.0552 0.1079 0.0142 0.0520 0.0662 0.0000 301.4075 301.4075 0.0586 0.0000 302.8732 003

0.0000 34.5691 34.5691 6.3300e0036.3600e- 0.0000 34.7273 003

6.3100e0030.0127 1.7100e0035.9600e0037.6700e0032026 0.3227 0.1578 0.2076 4.0000e004 2025 0.1602 1.3947 1.8018 3.4500e- 0.0527 0.0552 0.1079 0.0142 0.0520 0.0662 0.0000 301.4075 301.4075 0.0586 0.0000 302.8732 003
Total CO2 CH4 N2O CO2e
Year tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Mitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

0.0000 301.4078 301.4078
PM2.5
Total
Bio- CO2 NBio- CO2
Maximum 0.3227 1.3948 1.8018 3.4500e- 0.0527 0.0552 0.1079 0.0142 0.0520 0.0662 0.0586 0.0000 302.8735 003

0.0000 34.5691 34.5691 6.3300e0036.3600e- 0.0000 34.7274 003

6.3100e0030.0127 1.7100e0035.9600e0037.6700e0032026 0.3227 0.1578 0.2076 4.0000e004 2025 0.1602 1.3948 1.8018 3.4500e- 0.0527 0.0552 0.1079 0.0142 0.0520 0.0662 0.0000 301.4078 301.4078 0.0586 0.0000 302.8735 003
NBio- CO2 Total CO2 CH4 N2O CO2e
Year tons/yr MT/yr
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2

2.0 Emissions Summary

2.1 Overall Construction
Unmitigated Construction
ROG NOx CO SO2 Fugitive
PM10

Page 1958 of 4069 ends

Agenda Item #6.4.

Page 4 of 10 ends

Hunter Subdivision Project - Third Year - Napa County, Annual

10.80 7.30 20.00 LD_Mix HDT_Mix HHDT

7.30 20.00 LD_Mix HDT_Mix HHDT
Architectural Coating 1 11.00 0.00 0.00
Building Construction 9 55.00 11.00 0.00 10.80
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle
Class
Hauling
Vehicle
Class
Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Architectural Coating Air Compressors 1 6.00 78 0.48
Building Construction Welders 1 8.00 46 0.45
Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Building Construction Generator Sets 1 8.00 84 0.74
Building Construction Forklifts 3 8.00 89 0.20
Load Factor
Building Construction Cranes 1 7.00 231 0.29
Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
Residential Indoor: 87,480; Residential Outdoor: 29,160; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power 230
2 Architectural Coating Architectural Coating 1/31/2026 2/25/2026 5 18 End Date Num Days
Week
Num Days Phase Description
1 Building Construction Building Construction 3/17/2025 1/30/2026 5

3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date

Page 1959 of 4069 ends

Agenda Item #6.4.

Page 5 of 10 ends

Hunter Subdivision Project - Third Year - Napa County, Annual

0.0000 60.2115 60.2115 1.9300e0030.0527 3.7000e- 0.0000 60.2598 004

0.0531 0.0142 3.5000e004Total 0.0180 0.0979 0.1290 6.5000e- 0.0146 004

0.0000 32.1444 32.1444 6.3000e0040.0452 2.7000e- 0.0000 32.1601 004

0.0455 0.0120 2.5000e004Worker 0.0155 9.3000e- 0.0123
003

0.1059 3.6000e004

0.0000 28.0672 28.0672 1.3000e0037.5000e- 0.0000 28.0997 003

1.0000e0047.6000e0032.1700e0031.0000e0042.2700e003Vendor 2.4900e0030.0886 0.0231 2.9000e004 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

0.0000 241.1962 241.1962
PM2.5
Total
Bio- CO2 NBio- CO2
Total 0.1422 1.2969 1.6728 2.8000e- 0.0549 0.0549 0.0516 0.0516 0.0567 0.0000 242.6137 003
Off-Road 0.1422 1.2969 1.6728 2.8000e- 0.0549 0.0549 0.0516 0.0516 0.0000 241.1962 241.1962 0.0567 0.0000 242.6137 003
NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM10
PM10
Total
Bio- CO2

3.1 Mitigation Measures Construction

3.2 Building Construction - 2025
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total

Page 1960 of 4069 ends

Agenda Item #6.4.

Page 6 of 10 ends

Hunter Subdivision Project - Third Year - Napa County, Annual

0.0000 60.2115 60.2115 1.9300e0030.0527 3.7000e- 0.0000 60.2598 004

0.0531 0.0142 3.5000e004Total 0.0180 0.0979 0.1290 6.5000e- 0.0146 004

0.0000 32.1444 32.1444 6.3000e0040.0452 2.7000e- 0.0000 32.1601 004

0.0455 0.0120 2.5000e004Worker 0.0155 9.3000e- 0.0123
003

0.1059 3.6000e004

0.0000 28.0672 28.0672 1.3000e0037.5000e- 0.0000 28.0997 003

1.0000e0047.6000e0032.1700e0031.0000e0042.2700e003Vendor 2.4900e0030.0886 0.0231 2.9000e004 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

0.0000 241.1959 241.1959
PM2.5
Total
Bio- CO2 NBio- CO2
Total 0.1422 1.2969 1.6728 2.8000e- 0.0549 0.0549 0.0516 0.0516 0.0567 0.0000 242.6134 003
Off-Road 0.1422 1.2969 1.6728 2.8000e- 0.0549 0.0549 0.0516 0.0516 0.0000 241.1959 241.1959 0.0567 0.0000 242.6134 003
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2

Page 1961 of 4069 ends

Agenda Item #6.4.

Page 7 of 10 ends

Hunter Subdivision Project - Third Year - Napa County, Annual

0.0000 6.2247 6.2247 2.0000e0045.5700e- 0.0000 6.2297
003

4.0000e0055.6100e0031.5000e0034.0000e0051.5400e003Total 1.7900e0030.0102 0.0127 7.0000e005

0.0000 3.2714 3.2714 6.0000e0054.7800e- 0.0000 3.2729
003

3.0000e0054.8100e0031.2700e0033.0000e0051.3000e003Worker 1.5400e0039.0000e0040.0104 4.0000e005

0.0000 2.9533 2.9533 1.4000e0047.9000e- 0.0000 2.9568
004

1.0000e0058.0000e0042.3000e0041.0000e0052.4000e004Vendor 2.5000e0049.2700e0032.3400e0033.0000e005 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

0.0000 25.5111 25.5111
PM2.5
Total
Bio- CO2 NBio- CO2

6.0000e0035.8000e- 0.0000 25.6611
003

5.8000e0035.4600e0035.4600e003Total 0.0150 0.1372 0.1769 3.0000e004

0.0000 25.5111 25.5111 6.0000e0035.8000e- 0.0000 25.6611 003

5.8000e0035.4600e0035.4600e003Off-Road 0.0150 0.1372 0.1769 3.0000e004 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2

3.2 Building Construction - 2026 Page 1962 of 4069
Agenda Item #6.4.

Page 8 of 10 ends

Hunter Subdivision Project - Third Year - Napa County, Annual

0.0000 6.2247 6.2247 2.0000e0045.5700e- 0.0000 6.2297
003

4.0000e0055.6100e0031.5000e0034.0000e0051.5400e003Total 1.7900e0030.0102 0.0127 7.0000e005

0.0000 3.2714 3.2714 6.0000e0054.7800e- 0.0000 3.2729
003

3.0000e0054.8100e0031.2700e0033.0000e0051.3000e003Worker 1.5400e0039.0000e0040.0104 4.0000e005

0.0000 2.9533 2.9533 1.4000e0047.9000e- 0.0000 2.9568
004

1.0000e0058.0000e0042.3000e0041.0000e0052.4000e004Vendor 2.5000e0049.2700e0032.3400e0033.0000e005 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

0.0000 25.5111 25.5111
PM2.5
Total
Bio- CO2 NBio- CO2

6.0000e0035.8000e- 0.0000 25.6610
003

5.8000e0035.4600e0035.4600e003Total 0.0150 0.1372 0.1769 3.0000e004

0.0000 25.5111 25.5111 6.0000e0035.8000e- 0.0000 25.6610 003

5.8000e0035.4600e0035.4600e003Off-Road 0.0150 0.1372 0.1769 3.0000e004 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2

Page 1963 of 4069 ends

Agenda Item #6.4.

Page 9 of 10 ends

Hunter Subdivision Project - Third Year - Napa County, Annual

0.0000 0.5353 0.5353 1.0000e0057.8000e- 0.0000 0.5356
004

0.0000 7.9000e0042.1000e0040.0000 2.1000e004Total 2.5000e0041.5000e0041.7000e0031.0000e005

0.0000 0.5353 0.5353 1.0000e0057.8000e- 0.0000 0.5356
004

0.0000 7.9000e0042.1000e0040.0000 2.1000e004Worker 2.5000e0041.5000e0041.7000e0031.0000e005 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

0.0000 2.2979 2.2979
PM2.5
Total
Bio- CO2 NBio- CO2

1.3000e0044.6000e- 0.0000 2.3011
004

4.6000e0044.6000e0044.6000e004Total 0.3056 0.0103 0.0163 3.0000e005

0.0000 2.2979 2.2979 1.3000e0044.6000e- 0.0000 2.3011
004

4.6000e0044.6000e0044.6000e004Off-Road 1.5400e0030.0103 0.0163 3.0000e005 Archit. Coating 0.3041 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2

3.3 Architectural Coating - 2026 Page 1964 of 4069
Agenda Item #6.4.

Page 10 of 10 ends

Hunter Subdivision Project - Third Year - Napa County, Annual

0.0000 0.5353 0.5353 1.0000e0057.8000e- 0.0000 0.5356
004

0.0000 7.9000e0042.1000e0040.0000 2.1000e004Total 2.5000e0041.5000e0041.7000e0031.0000e005

0.0000 0.5353 0.5353 1.0000e0057.8000e- 0.0000 0.5356
004

0.0000 7.9000e0042.1000e0040.0000 2.1000e004Worker 2.5000e0041.5000e0041.7000e0031.0000e005 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

0.0000 2.2979 2.2979
PM2.5
Total
Bio- CO2 NBio- CO2

1.3000e0044.6000e- 0.0000 2.3011
004

4.6000e0044.6000e0044.6000e004Total 0.3056 0.0103 0.0163 3.0000e005

0.0000 2.2979 2.2979 1.3000e0044.6000e- 0.0000 2.3011
004

4.6000e0044.6000e0044.6000e004Off-Road 1.5400e0030.0103 0.0163 3.0000e005 Archit. Coating 0.3041 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2

Page 1965 of 4069 ends

Agenda Item #6.4.

Page 1 of 10 ends

Hunter Subdivision Project - Third Year - Napa County, Summer CalEEMod Version: CalEEMod.2016.3.2
Date: 3/3/2021 9:58 AM
Hunter Subdivision Project - Third Year
Napa County, Summer

1.0 Project Characteristics

1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population Apartments Low Rise 2.00 Dwelling Unit 0.13 2,000.00 5
Condo/Townhouse 25.00 Dwelling Unit 1.56 25,000.00 62
Single Family Housing 9.00 Dwelling Unit 2.92 16,200.00 22

1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 3.6 Precipitation Freq (Days) 64 Climate Zone 4 Operational Year 2026
Utility Company Pacific Gas & Electric Company
CO2 Intensity
(lb/MWhr)
641.35 CH4 Intensity
(lb/MWhr)

0.029 N2O Intensity
(lb/MWhr)

0.006

1.3 User Entered Comments & Non-Default Data
Project Characteristics - Hunter Subdivision Project. BAAQMD.

Land Use - Construction of 9 SF residences, 2 ADUs, and 25 low income units. Updated population per City of St Helena avg household size per BayAreaCensus.

Construction Phase - Assumed project would begin construction Spring 2025 (March), with completion in February 2026.

Off-road Equipment - Default equipment assumed.

Off-road Equipment - Default equipment assumed.

Off-road Equipment - Default equipment assumed.

Trips and VMT - Assumed same trips for construction of all res dwelling units. Page 1966 of 4069 Agenda Item #6.4.

Page 2 of 10 ends

Hunter Subdivision Project - Third Year - Napa County, Summer Grading - Assumed site would be balanced.

Table Name Column Name Default Value New Value
tblLandUse Population 6.00 5.00
tblLandUse Population 72.00 62.00
tblLandUse Population 26.00 22.00
tblTripsAndVMT VendorTripNumber 4.00 11.00

23.00 55.00
tblTripsAndVMT WorkerTripNumber 5.00 11.00
tblTripsAndVMT WorkerTripNumber

Page 1967 of 4069 ends

Agenda Item #6.4.

Page 3 of 10 ends

Hunter Subdivision Project - Third Year - Napa County, Summer NOx CO SO2 Fugitive
PM10
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2

2.0 Emissions Summary

2.1 Overall Construction (Maximum Daily Emission)
Unmitigated Construction
ROG NBio- CO2 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
Exhaust
PM10
PM10
Total
2025 1.5466 13.3933 17.3981 0.0334 0.5262 0.5312 1.0574 0.1413 0.4996 0.6409 0.0000 3,221.349 5 3,221.349
5 0.6214 0.0000 3,236.883
9 2026 33.9894 13.3772 17.3098 0.0333 0.5262 0.5311 1.0573 0.1413 0.4995 0.6408 0.0000 3,206.023 4 3,206.023
4 0.6208 0.0000 3,221.542
9 Maximum 33.9894 13.3933 17.3981 0.0334 0.6214 0.0000 3,236.883 9 0.5262 0.5312 1.0574 0.1413 0.4996 0.6409
SO2 Fugitive
PM10
Exhaust
PM10

0.0000 3,221.349
5 3,221.349
5 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction
ROG NOx CO Total CO2 CH4 N2O CO2e
Year lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
2025 1.5466 13.3933 17.3981 0.0334 0.5262 0.5312 1.0574 0.1413 0.4996 0.6409 0.0000 3,221.349 5 3,221.349
5 0.6214 0.0000 3,236.883
9 2026 33.9894 13.3772 17.3098 0.0333 0.5262 0.5311 1.0573 0.1413 0.4995 0.6408 0.0000 3,206.023 4 3,206.023
4 0.6208 0.0000 3,221.542
9 Maximum 33.9894 13.3933 17.3981 0.0334 0.5262 0.5312 1.0574 0.1413 0.4996 0.6409 0.0000 3,221.349 5 3,221.349
5 0.6214 0.0000 3,236.883
9 ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 1968 of 4069 ends

Agenda Item #6.4.

Page 4 of 10 ends

Hunter Subdivision Project - Third Year - Napa County, Summer

3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date End Date Num Days
Week
Num Days Phase Description
1 Building Construction Building Construction 3/17/2025 1/30/2026 5 230 2 Architectural Coating Architectural Coating 1/31/2026 2/25/2026 5 18 Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
Residential Indoor: 87,480; Residential Outdoor: 29,160; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area:

OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Building Construction Cranes 1 7.00 231 0.29
Building Construction Forklifts 3 8.00 89 0.20
Building Construction Generator Sets 1 8.00 84 0.74
Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Building Construction Welders 1 8.00 46 0.45
Architectural Coating Air Compressors 1 6.00 78 0.48
Hauling
Vehicle
Class
Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number

10.80 Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle
Class
Architectural Coating 1 11.00 0.00 0.00
Building Construction 9 55.00 11.00 0.00

20.00 LD_Mix HDT_Mix HHDT

7.30 20.00 LD_Mix HDT_Mix HHDT

10.80 7.30

Page 1969 of 4069 ends

Agenda Item #6.4.

Page 5 of 10 ends

Hunter Subdivision Project - Third Year - Napa County, Summer NOx CO SO2 Fugitive
PM10
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2

3.1 Mitigation Measures Construction

3.2 Building Construction - 2025
Unmitigated Construction On-Site
ROG NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM10
PM10
Total
Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.6010 2,571.498
1 0.5276 0.5276 0.4963 0.4963
SO2 Fugitive
PM10
Exhaust
PM10
2,556.474
4 2,556.474
4 PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0234 0.8450 0.2088 2.8300e0030.0744 9.6000e0040.0754 0.0214 9.2000e0040.0223 300.5382 300.5382 0.0133 300.8708 Worker 0.1558 0.0786 1.1046 3.6500e0030.4518 2.6300e0030.4545 0.1198 2.4200e0030.1223 364.3369 364.3369 7.1200e003364.5150 Total 0.1792 0.9236 1.3135 6.4800e0030.5262 3.5900e- 0.0204 665.3858 003

0.5298 0.1413 3.3400e0030.1446 664.8751 664.8751

Page 1970 of 4069 ends

Agenda Item #6.4.

Page 6 of 10 ends

Hunter Subdivision Project - Third Year - Napa County, Summer SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.6010 2,571.498
1 0.5276 0.5276 0.4963 0.4963
SO2 Fugitive
PM10
Exhaust
PM10

0.0000 2,556.474
4 2,556.474
4 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0234 0.8450 0.2088 2.8300e0030.0744 9.6000e0040.0754 0.0214 9.2000e0040.0223 300.5382 300.5382 0.0133 300.8708 Worker 0.1558 0.0786 1.1046 3.6500e0030.4518 2.6300e0030.4545 0.1198 2.4200e0030.1223 364.3369 364.3369 7.1200e003364.5150 Total 0.1792 0.9236 1.3135 6.4800e0030.5262 3.5900e- 0.0204 665.3858 003

0.5298 0.1413 3.3400e0030.1446 664.8751 664.8751

Page 1971 of 4069 ends

Agenda Item #6.4.

Page 7 of 10 ends

Hunter Subdivision Project - Third Year - Napa County, Summer SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2

3.2 Building Construction - 2026
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.6010 2,571.498
1 0.5276 0.5276 0.4963 0.4963
SO2 Fugitive
PM10
Exhaust
PM10
2,556.474
4 2,556.474
4 PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0226 0.8359 0.2000 2.8200e0030.0744 9.4000e0040.0754 0.0214 9.0000e0040.0223 298.9825 298.9825 0.0134 299.3167 Worker 0.1468 0.0716 1.0252 3.5200e0030.4518 2.5500e0030.4544 0.1198 2.3500e0030.1222 350.5666 350.5666 6.4600e003350.7281 Total 0.1694 0.9075 1.2252 6.3400e0030.5262 3.4900e- 0.0198 650.0448 003

0.5297 0.1413 3.2500e0030.1445 649.5491 649.5491

Page 1972 of 4069 ends

Agenda Item #6.4.

Page 8 of 10 ends

Hunter Subdivision Project - Third Year - Napa County, Summer SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.6010 2,571.498
1 0.5276 0.5276 0.4963 0.4963
SO2 Fugitive
PM10
Exhaust
PM10

0.0000 2,556.474
4 2,556.474
4 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0226 0.8359 0.2000 2.8200e0030.0744 9.4000e0040.0754 0.0214 9.0000e0040.0223 298.9825 298.9825 0.0134 299.3167 Worker 0.1468 0.0716 1.0252 3.5200e0030.4518 2.5500e0030.4544 0.1198 2.3500e0030.1222 350.5666 350.5666 6.4600e003350.7281 Total 0.1694 0.9075 1.2252 6.3400e0030.5262 3.4900e- 0.0198 650.0448 003

0.5297 0.1413 3.2500e0030.1445 649.5491 649.5491

Page 1973 of 4069 ends

Agenda Item #6.4.

Page 9 of 10 ends

Hunter Subdivision Project - Third Year - Napa County, Summer SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2

3.3 Architectural Coating - 2026
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 33.7892 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1709 1.1455 1.8091 2.9700e0030.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 Total 33.9600 1.1455 1.8091 2.9700e0030.0515 0.0515 0.0515 0.0515 0.0154 281.8319 SO2 Fugitive
PM10
Exhaust
PM10
281.4481 281.4481
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0294 0.0143 0.2050 7.0000e0040.0904 5.1000e0040.0909 0.0240 4.7000e0040.0244 70.1133 70.1133 1.2900e00370.1456 Total 0.0294 0.0143 0.2050 7.0000e0041.2900e0030.0904 5.1000e- 70.1456 004

0.0909 0.0240 4.7000e0040.0244 70.1133 70.1133

Page 1974 of 4069 ends

Agenda Item #6.4.

Page 10 of 10 ends

Hunter Subdivision Project - Third Year - Napa County, Summer SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 33.7892 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1709 1.1455 1.8091 2.9700e0030.0515 0.0515 0.0515 0.0515 0.0000 281.4481 281.4481 0.0154 281.8319 Total 33.9600 1.1455 1.8091 2.9700e0030.0515 0.0515 0.0515 0.0515 0.0154 281.8319 SO2 Fugitive
PM10
Exhaust
PM10

0.0000 281.4481 281.4481
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0294 0.0143 0.2050 7.0000e0040.0904 5.1000e0040.0909 0.0240 4.7000e0040.0244 70.1133 70.1133 1.2900e00370.1456 Total 0.0294 0.0143 0.2050 7.0000e0041.2900e0030.0904 5.1000e- 70.1456 004

0.0909 0.0240 4.7000e0040.0244 70.1133 70.1133

Page 1975 of 4069 ends

Agenda Item #6.4.

Page 1 of 10 ends

Hunter Subdivision Project - Third Year - Napa County, Winter CalEEMod Version: CalEEMod.2016.3.2
Date: 3/3/2021 10:01 AM
Hunter Subdivision Project - Third Year
Napa County, Winter

1.0 Project Characteristics

1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population Apartments Low Rise 2.00 Dwelling Unit 0.13 2,000.00 5
Condo/Townhouse 25.00 Dwelling Unit 1.56 25,000.00 62
Single Family Housing 9.00 Dwelling Unit 2.92 16,200.00 22

1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 3.6 Precipitation Freq (Days) 64 Climate Zone 4 Operational Year 2026
Utility Company Pacific Gas & Electric Company
CO2 Intensity
(lb/MWhr)
641.35 CH4 Intensity
(lb/MWhr)

0.029 N2O Intensity
(lb/MWhr)

0.006

1.3 User Entered Comments & Non-Default Data
Project Characteristics - Hunter Subdivision Project. BAAQMD.

Land Use - Construction of 9 SF residences, 2 ADUs, and 25 low income units. Updated population per City of St Helena avg household size per BayAreaCensus.

Construction Phase - Assumed project would begin construction Spring 2025 (March), with completion in February 2026.

Off-road Equipment - Default equipment assumed.

Off-road Equipment - Default equipment assumed.

Off-road Equipment - Default equipment assumed.

Trips and VMT - Assumed same trips for construction of all res dwelling units. Page 1976 of 4069 Agenda Item #6.4.

Page 2 of 10 ends

Hunter Subdivision Project - Third Year - Napa County, Winter Grading - Assumed site would be balanced.

Table Name Column Name Default Value New Value
tblLandUse Population 6.00 5.00
tblLandUse Population 72.00 62.00
tblLandUse Population 26.00 22.00
tblTripsAndVMT VendorTripNumber 4.00 11.00

23.00 55.00
tblTripsAndVMT WorkerTripNumber 5.00 11.00
tblTripsAndVMT WorkerTripNumber

Page 1977 of 4069 ends

Agenda Item #6.4.

Page 3 of 10 ends

Hunter Subdivision Project - Third Year - Napa County, Winter NOx CO SO2 Fugitive
PM10
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2

2.0 Emissions Summary

2.1 Overall Construction (Maximum Daily Emission)
Unmitigated Construction
ROG NBio- CO2 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
Exhaust
PM10
PM10
Total
2025 1.5568 13.4194 17.3733 0.0331 0.5262 0.5312 1.0574 0.1413 0.4996 0.6409 0.0000 3,186.766 2 3,186.766
2 0.6220 0.0000 3,202.317
0 2026 33.9911 13.4010 17.2851 0.0330 0.5262 0.5311 1.0573 0.1413 0.4995 0.6408 0.0000 3,172.522 1 3,172.522
1 0.6215 0.0000 3,188.058
8 Maximum 33.9911 13.4194 17.3733 0.0331 0.6220 0.0000 3,202.317 0 0.5262 0.5312 1.0574 0.1413 0.4996 0.6409
SO2 Fugitive
PM10
Exhaust
PM10

0.0000 3,186.766
2 3,186.766
2 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction
ROG NOx CO Total CO2 CH4 N2O CO2e
Year lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
2025 1.5568 13.4194 17.3733 0.0331 0.5262 0.5312 1.0574 0.1413 0.4996 0.6409 0.0000 3,186.766 2 3,186.766
2 0.6220 0.0000 3,202.317
0 2026 33.9911 13.4010 17.2851 0.0330 0.5262 0.5311 1.0573 0.1413 0.4995 0.6408 0.0000 3,172.522 1 3,172.522
1 0.6215 0.0000 3,188.058
8 Maximum 33.9911 13.4194 17.3733 0.0331 0.5262 0.5312 1.0574 0.1413 0.4996 0.6409 0.0000 3,186.766 2 3,186.766
2 0.6220 0.0000 3,202.317
0 ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 1978 of 4069 ends

Agenda Item #6.4.

Page 4 of 10 ends

Hunter Subdivision Project - Third Year - Napa County, Winter

3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date End Date Num Days
Week
Num Days Phase Description
1 Building Construction Building Construction 3/17/2025 1/30/2026 5 230 2 Architectural Coating Architectural Coating 1/31/2026 2/25/2026 5 18 Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
Residential Indoor: 87,480; Residential Outdoor: 29,160; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area:

OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Building Construction Cranes 1 7.00 231 0.29
Building Construction Forklifts 3 8.00 89 0.20
Building Construction Generator Sets 1 8.00 84 0.74
Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Building Construction Welders 1 8.00 46 0.45
Architectural Coating Air Compressors 1 6.00 78 0.48
Hauling
Vehicle
Class
Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number

10.80 Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle
Class
Architectural Coating 1 11.00 0.00 0.00
Building Construction 9 55.00 11.00 0.00

20.00 LD_Mix HDT_Mix HHDT

7.30 20.00 LD_Mix HDT_Mix HHDT

10.80 7.30

Page 1979 of 4069 ends

Agenda Item #6.4.

Page 5 of 10 ends

Hunter Subdivision Project - Third Year - Napa County, Winter NOx CO SO2 Fugitive
PM10
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2

3.1 Mitigation Measures Construction

3.2 Building Construction - 2025
Unmitigated Construction On-Site
ROG NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM10
PM10
Total
Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.6010 2,571.498
1 0.5276 0.5276 0.4963 0.4963
SO2 Fugitive
PM10
Exhaust
PM10
2,556.474
4 2,556.474
4 PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0249 0.8501 0.2383 2.7600e0030.0744 1.0000e0030.0754 0.0214 9.6000e0040.0224 293.2796 293.2796 0.0144 293.6400 Worker 0.1645 0.0996 1.0503 3.3800e0030.4518 2.6300e0030.4545 0.1198 2.4200e0030.1223 337.0123 337.0123 6.6600e003337.1789 Total 0.1894 0.9497 1.2887 6.1400e0030.5262 3.6300e- 0.0211 630.8189 003

0.5299 0.1413 3.3800e0030.1446 630.2919 630.2919

Page 1980 of 4069 ends

Agenda Item #6.4.

Page 6 of 10 ends

Hunter Subdivision Project - Third Year - Napa County, Winter SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.6010 2,571.498
1 0.5276 0.5276 0.4963 0.4963
SO2 Fugitive
PM10
Exhaust
PM10

0.0000 2,556.474
4 2,556.474
4 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0249 0.8501 0.2383 2.7600e0030.0744 1.0000e0030.0754 0.0214 9.6000e0040.0224 293.2796 293.2796 0.0144 293.6400 Worker 0.1645 0.0996 1.0503 3.3800e0030.4518 2.6300e0030.4545 0.1198 2.4200e0030.1223 337.0123 337.0123 6.6600e003337.1789 Total 0.1894 0.9497 1.2887 6.1400e0030.5262 3.6300e- 0.0211 630.8189 003

0.5299 0.1413 3.3800e0030.1446 630.2919 630.2919

Page 1981 of 4069 ends

Agenda Item #6.4.

Page 7 of 10 ends

Hunter Subdivision Project - Third Year - Napa County, Winter SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2

3.2 Building Construction - 2026
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.6010 2,571.498
1 0.5276 0.5276 0.4963 0.4963
SO2 Fugitive
PM10
Exhaust
PM10
2,556.474
4 2,556.474
4 PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0241 0.8406 0.2282 2.7500e0030.0744 9.8000e0040.0754 0.0214 9.4000e0040.0224 291.7753 291.7753 0.0145 292.1376 Worker 0.1554 0.0907 0.9723 3.2500e0030.4518 2.5500e0030.4544 0.1198 2.3500e0030.1222 324.2724 324.2724 6.0300e003324.4231 Total 0.1795 0.9314 1.2005 6.0000e0030.5262 3.5300e- 0.0205 616.5607 003

0.5298 0.1413 3.2900e0030.1446 616.0477 616.0477

Page 1982 of 4069 ends

Agenda Item #6.4.

Page 8 of 10 ends

Hunter Subdivision Project - Third Year - Napa County, Winter SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.6010 2,571.498
1 0.5276 0.5276 0.4963 0.4963
SO2 Fugitive
PM10
Exhaust
PM10

0.0000 2,556.474
4 2,556.474
4 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0241 0.8406 0.2282 2.7500e0030.0744 9.8000e0040.0754 0.0214 9.4000e0040.0224 291.7753 291.7753 0.0145 292.1376 Worker 0.1554 0.0907 0.9723 3.2500e0030.4518 2.5500e0030.4544 0.1198 2.3500e0030.1222 324.2724 324.2724 6.0300e003324.4231 Total 0.1795 0.9314 1.2005 6.0000e0030.5262 3.5300e- 0.0205 616.5607 003

0.5298 0.1413 3.2900e0030.1446 616.0477 616.0477

Page 1983 of 4069 ends

Agenda Item #6.4.

Page 9 of 10 ends

Hunter Subdivision Project - Third Year - Napa County, Winter SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2

3.3 Architectural Coating - 2026
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 33.7892 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1709 1.1455 1.8091 2.9700e0030.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 Total 33.9600 1.1455 1.8091 2.9700e0030.0515 0.0515 0.0515 0.0515 0.0154 281.8319 SO2 Fugitive
PM10
Exhaust
PM10
281.4481 281.4481
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0311 0.0182 0.1945 6.5000e0040.0904 5.1000e0040.0909 0.0240 4.7000e0040.0244 64.8545 64.8545 1.2100e00364.8846 Total 0.0311 0.0182 0.1945 6.5000e0041.2100e0030.0904 5.1000e- 64.8846 004

0.0909 0.0240 4.7000e0040.0244 64.8545 64.8545

Page 1984 of 4069 ends

Agenda Item #6.4.

Page 10 of 10 ends

Hunter Subdivision Project - Third Year - Napa County, Winter SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 33.7892 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1709 1.1455 1.8091 2.9700e0030.0515 0.0515 0.0515 0.0515 0.0000 281.4481 281.4481 0.0154 281.8319 Total 33.9600 1.1455 1.8091 2.9700e0030.0515 0.0515 0.0515 0.0515 0.0154 281.8319 SO2 Fugitive
PM10
Exhaust
PM10

0.0000 281.4481 281.4481
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0311 0.0182 0.1945 6.5000e0040.0904 5.1000e0040.0909 0.0240 4.7000e0040.0244 64.8545 64.8545 1.2100e00364.8846 Total 0.0311 0.0182 0.1945 6.5000e0041.2100e0030.0904 5.1000e- 64.8846 004

0.0909 0.0240 4.7000e0040.0244 64.8545 64.8545

Page 1985 of 4069 ends

Agenda Item #6.4.

Page 1 of 8 ends

Hunter Subdivision Project - Fourth Year - Napa County, Annual Off-road Equipment - Default equipment assumed.

Trips and VMT - Assumed same trips for construction of all res dwelling units.

Grading - Assumed site would be balanced.

1.3 User Entered Comments & Non-Default Data
Project Characteristics - Hunter Subdivision Project. BAAQMD.

Land Use - Construction of 9 SF residences and 2 ADUs. Updated population per City of St Helena avg household size per BayAreaCensus.

Construction Phase - Assumed project would begin construction Spring 2026 (March), with completion in November 2026.

Off-road Equipment - Default equipment assumed.

Off-road Equipment - Default equipment assumed.

CO2 Intensity
(lb/MWhr)
641.35 CH4 Intensity
(lb/MWhr)

0.029 N2O Intensity
(lb/MWhr)

0.006
64 Climate Zone 4 Operational Year 2027
Utility Company Pacific Gas & Electric Company

1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 3.6 Precipitation Freq (Days) Single Family Housing 9.00 Dwelling Unit 2.92 16,200.00 22 Floor Surface Area Population
Apartments Low Rise 2.00 Dwelling Unit 0.13 2,000.00 5

1.0 Project Characteristics

1.1 Land Usage
Land Uses Size Metric Lot Acreage
CalEEMod Version: CalEEMod.2016.3.2
Date: 3/3/2021 10:30 AM
Hunter Subdivision Project - Fourth Year
Napa County, Annual

Page 1986 of 4069 ends

Agenda Item #6.4.

Page 2 of 8 ends

Hunter Subdivision Project - Fourth Year - Napa County, Annual tblTripsAndVMT WorkerTripNumber 1.00 11.00
tblTripsAndVMT VendorTripNumber 1.00 11.00
tblTripsAndVMT WorkerTripNumber 5.00 55.00
tblLandUse Population 6.00 5.00
tblLandUse Population 26.00 22.00
tblConstructionPhase PhaseEndDate 2/5/2027 10/16/2026
tblConstructionPhase PhaseStartDate 2/6/2027 10/17/2026 tblConstructionPhase NumDays 230.00 150.00
tblConstructionPhase PhaseEndDate 3/3/2027 11/11/2026
Table Name Column Name Default Value New Value

Page 1987 of 4069 ends

Agenda Item #6.4.

Page 3 of 8 ends

Hunter Subdivision Project - Fourth Year - Napa County, Annual

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction

0.00 0.00 0.00 0.00
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
ROG NOx CO SO2 Fugitive Bio- CO2
PM10
Maximum 0.2447 1.0150 1.3110 2.5100e- 0.0388 0.0403 0.0791 0.0104 0.0379 0.0484 0.0000 219.2138 219.2138 0.0424 0.0000 220.2732 003
2026 0.2447 1.0150 1.3110 2.5100e- 0.0388 0.0403 0.0791 0.0104 0.0379 0.0484 0.0000 219.2138 219.2138 0.0424 0.0000 220.2732 003
Total CO2 CH4 N2O CO2e
Year tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Maximum 0.2447 1.0150 1.3110 2.5100e- 0.0388 0.0403 0.0791 0.0104 0.0379 0.0484 0.0000 219.2140 219.2140 0.0424 0.0000 220.2734 003
2026 0.2447 1.0150 1.3110 2.5100e- 0.0388 0.0403 0.0791 0.0104 0.0379 0.0484 0.0000 219.2140 219.2140 0.0424 0.0000 220.2734 003
CH4 N2O CO2e
Year tons/yr MT/yr
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2
Unmitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total

2.0 Emissions Summary

2.1 Overall Construction Page 1988 of 4069
Agenda Item #6.4.

Page 4 of 8 ends

Hunter Subdivision Project - Fourth Year - Napa County, Annual

10.80 7.30 20.00 LD_Mix HDT_Mix HHDT

7.30 20.00 LD_Mix HDT_Mix HHDT
Architectural Coating 1 11.00 0.00 0.00
Building Construction 9 55.00 11.00 0.00 10.80
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle
Class
Hauling
Vehicle
Class
Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Architectural Coating Air Compressors 1 6.00 78 0.48
Building Construction Welders 1 8.00 46 0.45
Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Building Construction Generator Sets 1 8.00 84 0.74
Building Construction Forklifts 3 8.00 89 0.20
Load Factor
Building Construction Cranes 1 7.00 231 0.29
Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
Residential Indoor: 36,855; Residential Outdoor: 12,285; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power 150
2 Architectural Coating Architectural Coating 10/17/2026 11/11/2026 5 18 End Date Num Days
Week
Num Days Phase Description
1 Building Construction Building Construction 3/23/2026 10/16/2026 5

3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date

Page 1989 of 4069 ends

Agenda Item #6.4.

Page 5 of 8 ends

Hunter Subdivision Project - Fourth Year - Napa County, Annual

0.0000 42.4411 42.4411 1.3500e0030.0380 2.6000e- 0.0000 42.4750 004

0.0383 0.0102 2.5000e004Total 0.0123 0.0693 0.0867 4.6000e- 0.0105 004

0.0000 22.3047 22.3047 4.1000e0040.0326 1.9000e- 0.0000 22.3150 004

0.0328 8.6700e0031.8000e0048.8500e003Worker 0.0105 6.1100e0030.0708 2.5000e004

0.0000 20.1364 20.1364 9.4000e0045.4100e- 0.0000 20.1600 003

7.0000e0055.4800e0031.5600e0037.0000e0051.6300e003Vendor 1.7400e0030.0632 0.0160 2.1000e004 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Total 0.1026 0.9352 1.2064 2.0200e- 0.0396 0.0396 0.0372 0.0372 0.0000 173.9396 173.9396 0.0409 0.0000 174.9618 003
Off-Road 0.1026 0.9352 1.2064 2.0200e- 0.0396 0.0396 0.0372 0.0372 0.0000 173.9396 173.9396 0.0409 0.0000 174.9618 003
NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2

3.1 Mitigation Measures Construction

3.2 Building Construction - 2026
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10

Page 1990 of 4069 ends

Agenda Item #6.4.

Page 6 of 8 ends

Hunter Subdivision Project - Fourth Year - Napa County, Annual

0.0000 42.4411 42.4411 1.3500e0030.0380 2.6000e- 0.0000 42.4750 004

0.0383 0.0102 2.5000e004Total 0.0123 0.0693 0.0867 4.6000e- 0.0105 004

0.0000 22.3047 22.3047 4.1000e0040.0326 1.9000e- 0.0000 22.3150 004

0.0328 8.6700e0031.8000e0048.8500e003Worker 0.0105 6.1100e0030.0708 2.5000e004

0.0000 20.1364 20.1364 9.4000e0045.4100e- 0.0000 20.1600 003

7.0000e0055.4800e0031.5600e0037.0000e0051.6300e003Vendor 1.7400e0030.0632 0.0160 2.1000e004 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Total 0.1026 0.9352 1.2064 2.0200e- 0.0396 0.0396 0.0372 0.0372 0.0000 173.9394 173.9394 0.0409 0.0000 174.9616 003
Off-Road 0.1026 0.9352 1.2064 2.0200e- 0.0396 0.0396 0.0372 0.0372 0.0000 173.9394 173.9394 0.0409 0.0000 174.9616 003
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

Page 1991 of 4069 ends

Agenda Item #6.4.

Page 7 of 8 ends

Hunter Subdivision Project - Fourth Year - Napa County, Annual

0.0000 0.5353 0.5353 1.0000e0057.8000e- 0.0000 0.5356
004

0.0000 7.9000e0042.1000e0040.0000 2.1000e004Total 2.5000e0041.5000e0041.7000e0031.0000e005

0.0000 0.5353 0.5353 1.0000e0057.8000e- 0.0000 0.5356
004

0.0000 7.9000e0042.1000e0040.0000 2.1000e004Worker 2.5000e0041.5000e0041.7000e0031.0000e005 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

0.0000 2.2979 2.2979 1.3000e0044.6000e- 0.0000 2.3011
004

4.6000e0044.6000e0044.6000e004Total 0.1297 0.0103 0.0163 3.0000e005

0.0000 2.2979 2.2979 1.3000e0044.6000e- 0.0000 2.3011
004

4.6000e0044.6000e0044.6000e004Off-Road 1.5400e0030.0103 0.0163 3.0000e005 Archit. Coating 0.1281 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2

3.3 Architectural Coating - 2026
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

Page 1992 of 4069 ends

Agenda Item #6.4.

Page 8 of 8 ends

Hunter Subdivision Project - Fourth Year - Napa County, Annual

0.0000 0.5353 0.5353 1.0000e0057.8000e- 0.0000 0.5356
004

0.0000 7.9000e0042.1000e0040.0000 2.1000e004Total 2.5000e0041.5000e0041.7000e0031.0000e005

0.0000 0.5353 0.5353 1.0000e0057.8000e- 0.0000 0.5356
004

0.0000 7.9000e0042.1000e0040.0000 2.1000e004Worker 2.5000e0041.5000e0041.7000e0031.0000e005 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

0.0000 2.2979 2.2979 1.3000e0044.6000e- 0.0000 2.3011
004

4.6000e0044.6000e0044.6000e004Total 0.1297 0.0103 0.0163 3.0000e005

0.0000 2.2979 2.2979 1.3000e0044.6000e- 0.0000 2.3011
004

4.6000e0044.6000e0044.6000e004Off-Road 1.5400e0030.0103 0.0163 3.0000e005 Archit. Coating 0.1281 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

Page 1993 of 4069 ends

Agenda Item #6.4.

Page 1 of 8 ends

Hunter Subdivision Project - Fourth Year - Napa County, Summer Off-road Equipment - Default equipment assumed.

Trips and VMT - Assumed same trips for construction of all res dwelling units.

Grading - Assumed site would be balanced.

1.3 User Entered Comments & Non-Default Data
Project Characteristics - Hunter Subdivision Project. BAAQMD.

Land Use - Construction of 9 SF residences and 2 ADUs. Updated population per City of St Helena avg household size per BayAreaCensus.

Construction Phase - Assumed project would begin construction Spring 2026 (March), with completion in November 2026.

Off-road Equipment - Default equipment assumed.

Off-road Equipment - Default equipment assumed.

CO2 Intensity
(lb/MWhr)
641.35 CH4 Intensity
(lb/MWhr)

0.029 N2O Intensity
(lb/MWhr)

0.006
64 Climate Zone 4 Operational Year 2027
Utility Company Pacific Gas & Electric Company

1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 3.6 Precipitation Freq (Days) Single Family Housing 9.00 Dwelling Unit 2.92 16,200.00 22 Floor Surface Area Population
Apartments Low Rise 2.00 Dwelling Unit 0.13 2,000.00 5

1.0 Project Characteristics

1.1 Land Usage
Land Uses Size Metric Lot Acreage
CalEEMod Version: CalEEMod.2016.3.2
Date: 3/3/2021 10:32 AM
Hunter Subdivision Project - Fourth Year
Napa County, Summer

Page 1994 of 4069 ends

Agenda Item #6.4.

Page 2 of 8 ends

Hunter Subdivision Project - Fourth Year - Napa County, Summer tblTripsAndVMT WorkerTripNumber 1.00 11.00
tblTripsAndVMT VendorTripNumber 1.00 11.00
tblTripsAndVMT WorkerTripNumber 5.00 55.00
tblLandUse Population 6.00 5.00
tblLandUse Population 26.00 22.00
tblConstructionPhase PhaseEndDate 2/5/2027 10/16/2026
tblConstructionPhase PhaseStartDate 2/6/2027 10/17/2026 tblConstructionPhase NumDays 230.00 150.00
tblConstructionPhase PhaseEndDate 3/3/2027 11/11/2026
Table Name Column Name Default Value New Value

Page 1995 of 4069 ends

Agenda Item #6.4.

Page 3 of 8 ends

Hunter Subdivision Project - Fourth Year - Napa County, Summer

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction

0.00 0.00 0.00 0.00
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
ROG NOx CO SO2 Fugitive Bio- CO2
PM10

0.0000 3,206.023
4 3,206.023
4 0.6208 0.0000 3,221.542
9 Maximum 14.4355 13.3772 17.3098 0.0333 0.5262 0.5311 1.0573 0.1413 0.4995 0.6408

0.0000 3,206.023
4 3,206.023
4 0.6208 0.0000 3,221.542
9 2026 14.4355 13.3772 17.3098 0.0333 0.5262 0.5311 1.0573 0.1413 0.4995 0.6408 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

0.0000 3,206.023
4 3,206.023
4 0.6208 0.0000 3,221.542
9 Maximum 14.4355 13.3772 17.3098 0.0333 0.5262 0.5311 1.0573 0.1413 0.4995 0.6408

0.0000 3,206.023
4 3,206.023
4 0.6208 0.0000 3,221.542
9 2026 14.4355 13.3772 17.3098 0.0333 0.5262 0.5311 1.0573 0.1413 0.4995 0.6408 CH4 N2O CO2e
Year lb/day lb/day
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2
Unmitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total

2.0 Emissions Summary

2.1 Overall Construction (Maximum Daily Emission) Page 1996 of 4069 Agenda Item #6.4.

Page 4 of 8 ends

Hunter Subdivision Project - Fourth Year - Napa County, Summer

10.80 7.30 20.00 LD_Mix HDT_Mix HHDT

7.30 20.00 LD_Mix HDT_Mix HHDT
Architectural Coating 1 11.00 0.00 0.00
Building Construction 9 55.00 11.00 0.00 10.80
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle
Class
Hauling
Vehicle
Class
Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Architectural Coating Air Compressors 1 6.00 78 0.48
Building Construction Welders 1 8.00 46 0.45
Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Building Construction Generator Sets 1 8.00 84 0.74
Building Construction Forklifts 3 8.00 89 0.20
Load Factor
Building Construction Cranes 1 7.00 231 0.29
Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
Residential Indoor: 36,855; Residential Outdoor: 12,285; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area:

OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power 150
2 Architectural Coating Architectural Coating 10/17/2026 11/11/2026 5 18 End Date Num Days
Week
Num Days Phase Description
1 Building Construction Building Construction 3/23/2026 10/16/2026 5

3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date

Page 1997 of 4069 ends

Agenda Item #6.4.

Page 5 of 8 ends

Hunter Subdivision Project - Fourth Year - Napa County, Summer

0.5262 3.4900e- 649.5491 649.5491 0.0198 650.0448
003

0.5297 0.1413 3.2500e003Total 0.1694 0.9075 1.2252 6.3400e- 0.1445 003
350.5666 350.5666 6.4600e0030.4518 2.5500e- 350.7281
003

0.4544 0.1198 2.3500e003Worker 0.1468 0.0716 1.0252 3.5200e- 0.1222 003

0.0744 9.4000e- 298.9825 298.9825 0.0134 299.3167
004

0.0754 0.0214 9.0000e004Vendor 0.0226 0.8359 0.2000 2.8200e- 0.0223 003
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
2,556.474
4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474
4 2,556.474
4 0.6010 2,571.498
1 Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2

3.1 Mitigation Measures Construction

3.2 Building Construction - 2026
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10

Page 1998 of 4069 ends

Agenda Item #6.4.

Page 6 of 8 ends

Hunter Subdivision Project - Fourth Year - Napa County, Summer

0.5262 3.4900e- 649.5491 649.5491 0.0198 650.0448
003

0.5297 0.1413 3.2500e003Total 0.1694 0.9075 1.2252 6.3400e- 0.1445 003
350.5666 350.5666 6.4600e0030.4518 2.5500e- 350.7281
003

0.4544 0.1198 2.3500e003Worker 0.1468 0.0716 1.0252 3.5200e- 0.1222 003

0.0744 9.4000e- 298.9825 298.9825 0.0134 299.3167
004

0.0754 0.0214 9.0000e004Vendor 0.0226 0.8359 0.2000 2.8200e- 0.0223 003
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

0.0000 2,556.474
4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963

0.0000 2,556.474
4 2,556.474
4 0.6010 2,571.498
1 Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

Page 1999 of 4069 ends

Agenda Item #6.4.

Page 7 of 8 ends

Hunter Subdivision Project - Fourth Year - Napa County, Summer

70.1133 70.1133 1.2900e0030.0904 5.1000e- 70.1456
004

0.0909 0.0240 4.7000e004Total 0.0294 0.0143 0.2050 7.0000e- 0.0244 004

70.1133 70.1133 1.2900e0030.0904 5.1000e- 70.1456
004

0.0909 0.0240 4.7000e004Worker 0.0294 0.0143 0.2050 7.0000e- 0.0244 004
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Total 14.4061 1.1455 1.8091 2.9700e- 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 003
Off-Road 0.1709 1.1455 1.8091 2.9700e- 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 003
Archit. Coating 14.2352 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2

3.3 Architectural Coating - 2026
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

Page 2000 of 4069 ends

Agenda Item #6.4.

Page 8 of 8 ends

Hunter Subdivision Project - Fourth Year - Napa County, Summer

70.1133 70.1133 1.2900e0030.0904 5.1000e- 70.1456
004

0.0909 0.0240 4.7000e004Total 0.0294 0.0143 0.2050 7.0000e- 0.0244 004

70.1133 70.1133 1.2900e0030.0904 5.1000e- 70.1456
004

0.0909 0.0240 4.7000e004Worker 0.0294 0.0143 0.2050 7.0000e- 0.0244 004
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Total 14.4061 1.1455 1.8091 2.9700e- 0.0515 0.0515 0.0515 0.0515 0.0000 281.4481 281.4481 0.0154 281.8319 003
Off-Road 0.1709 1.1455 1.8091 2.9700e- 0.0515 0.0515 0.0515 0.0515 0.0000 281.4481 281.4481 0.0154 281.8319 003
Archit. Coating 14.2352 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

Page 2001 of 4069 ends

Agenda Item #6.4.

Page 1 of 8 ends

Hunter Subdivision Project - Fourth Year - Napa County, Winter Off-road Equipment - Default equipment assumed.

Trips and VMT - Assumed same trips for construction of all res dwelling units.

Grading - Assumed site would be balanced.

1.3 User Entered Comments & Non-Default Data
Project Characteristics - Hunter Subdivision Project. BAAQMD.

Land Use - Construction of 9 SF residences and 2 ADUs. Updated population per City of St Helena avg household size per BayAreaCensus.

Construction Phase - Assumed project would begin construction Spring 2026 (March), with completion in November 2026.

Off-road Equipment - Default equipment assumed.

Off-road Equipment - Default equipment assumed.

CO2 Intensity
(lb/MWhr)
641.35 CH4 Intensity
(lb/MWhr)

0.029 N2O Intensity
(lb/MWhr)

0.006
64 Climate Zone 4 Operational Year 2027
Utility Company Pacific Gas & Electric Company

1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 3.6 Precipitation Freq (Days) Single Family Housing 9.00 Dwelling Unit 2.92 16,200.00 22 Floor Surface Area Population
Apartments Low Rise 2.00 Dwelling Unit 0.13 2,000.00 5

1.0 Project Characteristics

1.1 Land Usage
Land Uses Size Metric Lot Acreage
CalEEMod Version: CalEEMod.2016.3.2
Date: 3/3/2021 10:33 AM
Hunter Subdivision Project - Fourth Year
Napa County, Winter

Page 2002 of 4069 ends

Agenda Item #6.4.

Page 2 of 8 ends

Hunter Subdivision Project - Fourth Year - Napa County, Winter tblTripsAndVMT WorkerTripNumber 1.00 11.00
tblTripsAndVMT VendorTripNumber 1.00 11.00
tblTripsAndVMT WorkerTripNumber 5.00 55.00
tblLandUse Population 6.00 5.00
tblLandUse Population 26.00 22.00
tblConstructionPhase PhaseEndDate 2/5/2027 10/16/2026
tblConstructionPhase PhaseStartDate 2/6/2027 10/17/2026 tblConstructionPhase NumDays 230.00 150.00
tblConstructionPhase PhaseEndDate 3/3/2027 11/11/2026
Table Name Column Name Default Value New Value

Page 2003 of 4069 ends

Agenda Item #6.4.

Page 3 of 8 ends

Hunter Subdivision Project - Fourth Year - Napa County, Winter

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction

0.00 0.00 0.00 0.00
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
ROG NOx CO SO2 Fugitive Bio- CO2
PM10

0.0000 3,172.522
1 3,172.522
1 0.6215 0.0000 3,188.058
8 Maximum 14.4372 13.4010 17.2851 0.0330 0.5262 0.5311 1.0573 0.1413 0.4995 0.6408

0.0000 3,172.522
1 3,172.522
1 0.6215 0.0000 3,188.058
8 2026 14.4372 13.4010 17.2851 0.0330 0.5262 0.5311 1.0573 0.1413 0.4995 0.6408 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

0.0000 3,172.522
1 3,172.522
1 0.6215 0.0000 3,188.058
8 Maximum 14.4372 13.4010 17.2851 0.0330 0.5262 0.5311 1.0573 0.1413 0.4995 0.6408

0.0000 3,172.522
1 3,172.522
1 0.6215 0.0000 3,188.058
8 2026 14.4372 13.4010 17.2851 0.0330 0.5262 0.5311 1.0573 0.1413 0.4995 0.6408 CH4 N2O CO2e
Year lb/day lb/day
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2
Unmitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total

2.0 Emissions Summary

2.1 Overall Construction (Maximum Daily Emission) Page 2004 of 4069 Agenda Item #6.4.

Page 4 of 8 ends

Hunter Subdivision Project - Fourth Year - Napa County, Winter

10.80 7.30 20.00 LD_Mix HDT_Mix HHDT

7.30 20.00 LD_Mix HDT_Mix HHDT
Architectural Coating 1 11.00 0.00 0.00
Building Construction 9 55.00 11.00 0.00 10.80
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle
Class
Hauling
Vehicle
Class
Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Architectural Coating Air Compressors 1 6.00 78 0.48
Building Construction Welders 1 8.00 46 0.45
Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Building Construction Generator Sets 1 8.00 84 0.74
Building Construction Forklifts 3 8.00 89 0.20
Load Factor
Building Construction Cranes 1 7.00 231 0.29
Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
Residential Indoor: 36,855; Residential Outdoor: 12,285; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area:

OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power 150
2 Architectural Coating Architectural Coating 10/17/2026 11/11/2026 5 18 End Date Num Days
Week
Num Days Phase Description
1 Building Construction Building Construction 3/23/2026 10/16/2026 5

3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date

Page 2005 of 4069 ends

Agenda Item #6.4.

Page 5 of 8 ends

Hunter Subdivision Project - Fourth Year - Napa County, Winter

0.5262 3.5300e- 616.0477 616.0477 0.0205 616.5607
003

0.5298 0.1413 3.2900e003Total 0.1795 0.9314 1.2005 6.0000e- 0.1446 003
324.2724 324.2724 6.0300e0030.4518 2.5500e- 324.4231
003

0.4544 0.1198 2.3500e003Worker 0.1554 0.0907 0.9723 3.2500e- 0.1222 003

0.0744 9.8000e- 291.7753 291.7753 0.0145 292.1376
004

0.0754 0.0214 9.4000e004Vendor 0.0241 0.8406 0.2282 2.7500e- 0.0224 003
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
2,556.474
4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474
4 2,556.474
4 0.6010 2,571.498
1 Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2

3.1 Mitigation Measures Construction

3.2 Building Construction - 2026
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10

Page 2006 of 4069 ends

Agenda Item #6.4.

Page 6 of 8 ends

Hunter Subdivision Project - Fourth Year - Napa County, Winter

0.5262 3.5300e- 616.0477 616.0477 0.0205 616.5607
003

0.5298 0.1413 3.2900e003Total 0.1795 0.9314 1.2005 6.0000e- 0.1446 003
324.2724 324.2724 6.0300e0030.4518 2.5500e- 324.4231
003

0.4544 0.1198 2.3500e003Worker 0.1554 0.0907 0.9723 3.2500e- 0.1222 003

0.0744 9.8000e- 291.7753 291.7753 0.0145 292.1376
004

0.0754 0.0214 9.4000e004Vendor 0.0241 0.8406 0.2282 2.7500e- 0.0224 003
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

0.0000 2,556.474
4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963

0.0000 2,556.474
4 2,556.474
4 0.6010 2,571.498
1 Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

Page 2007 of 4069 ends

Agenda Item #6.4.

Page 7 of 8 ends

Hunter Subdivision Project - Fourth Year - Napa County, Winter

64.8545 64.8545 1.2100e0030.0904 5.1000e- 64.8846
004

0.0909 0.0240 4.7000e004Total 0.0311 0.0182 0.1945 6.5000e- 0.0244 004

64.8545 64.8545 1.2100e0030.0904 5.1000e- 64.8846
004

0.0909 0.0240 4.7000e004Worker 0.0311 0.0182 0.1945 6.5000e- 0.0244 004
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Total 14.4061 1.1455 1.8091 2.9700e- 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 003
Off-Road 0.1709 1.1455 1.8091 2.9700e- 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 003
Archit. Coating 14.2352 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2

3.3 Architectural Coating - 2026
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

Page 2008 of 4069 ends

Agenda Item #6.4.

Page 8 of 8 ends

Hunter Subdivision Project - Fourth Year - Napa County, Winter

64.8545 64.8545 1.2100e0030.0904 5.1000e- 64.8846
004

0.0909 0.0240 4.7000e004Total 0.0311 0.0182 0.1945 6.5000e- 0.0244 004

64.8545 64.8545 1.2100e0030.0904 5.1000e- 64.8846
004

0.0909 0.0240 4.7000e004Worker 0.0311 0.0182 0.1945 6.5000e- 0.0244 004
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Total 14.4061 1.1455 1.8091 2.9700e- 0.0515 0.0515 0.0515 0.0515 0.0000 281.4481 281.4481 0.0154 281.8319 003
Off-Road 0.1709 1.1455 1.8091 2.9700e- 0.0515 0.0515 0.0515 0.0515 0.0000 281.4481 281.4481 0.0154 281.8319 003
Archit. Coating 14.2352 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

Page 2009 of 4069 ends

Agenda Item #6.4.

Page 1 of 8 ends

Hunter Subdivision Project - Fifth Year - Napa County, Annual Off-road Equipment - Default equipment assumed.

Trips and VMT - Assumed same trips for construction of all res dwelling units.

Grading - Assumed site would be balanced.

1.3 User Entered Comments & Non-Default Data
Project Characteristics - Hunter Subdivision Project. BAAQMD.

Land Use - Construction of 9 SF residences and 2 ADUs. Updated population per City of St Helena avg household size per BayAreaCensus.

Construction Phase - Assumed project would begin construction Spring 2027 (March), with completion in November 2027.

Off-road Equipment - Default equipment assumed.

Off-road Equipment - Default equipment assumed.

CO2 Intensity
(lb/MWhr)
641.35 CH4 Intensity
(lb/MWhr)

0.029 N2O Intensity
(lb/MWhr)

0.006
64 Climate Zone 4 Operational Year 2028
Utility Company Pacific Gas & Electric Company

1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 3.6 Precipitation Freq (Days) Single Family Housing 9.00 Dwelling Unit 2.92 16,200.00 22 Floor Surface Area Population
Apartments Low Rise 2.00 Dwelling Unit 0.13 2,000.00 5

1.0 Project Characteristics

1.1 Land Usage
Land Uses Size Metric Lot Acreage
CalEEMod Version: CalEEMod.2016.3.2
Date: 3/3/2021 10:38 AM
Hunter Subdivision Project - Fifth Year
Napa County, Annual

Page 2010 of 4069 ends

Agenda Item #6.4.

Page 2 of 8 ends

Hunter Subdivision Project - Fifth Year - Napa County, Annual tblTripsAndVMT WorkerTripNumber 1.00 11.00
tblTripsAndVMT VendorTripNumber 1.00 11.00
tblTripsAndVMT WorkerTripNumber 5.00 55.00
tblLandUse Population 6.00 5.00
tblLandUse Population 26.00 22.00
tblConstructionPhase PhaseEndDate 2/4/2028 10/15/2027
tblConstructionPhase PhaseStartDate 2/5/2028 10/16/2027 tblConstructionPhase NumDays 230.00 150.00
tblConstructionPhase PhaseEndDate 3/1/2028 11/10/2027
Table Name Column Name Default Value New Value

Page 2011 of 4069 ends

Agenda Item #6.4.

Page 3 of 8 ends

Hunter Subdivision Project - Fifth Year - Napa County, Annual

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction

0.00 0.00 0.00 0.00
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
ROG NOx CO SO2 Fugitive Bio- CO2
PM10
Maximum 0.2440 1.0137 1.3052 2.5000e- 0.0388 0.0403 0.0791 0.0104 0.0379 0.0484 0.0000 218.3153 218.3153 0.0423 0.0000 219.3738 003
2027 0.2440 1.0137 1.3052 2.5000e- 0.0388 0.0403 0.0791 0.0104 0.0379 0.0484 0.0000 218.3153 218.3153 0.0423 0.0000 219.3738 003
Total CO2 CH4 N2O CO2e
Year tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Maximum 0.2440 1.0137 1.3052 2.5000e- 0.0388 0.0403 0.0791 0.0104 0.0379 0.0484 0.0000 218.3155 218.3155 0.0423 0.0000 219.3740 003
2027 0.2440 1.0137 1.3052 2.5000e- 0.0388 0.0403 0.0791 0.0104 0.0379 0.0484 0.0000 218.3155 218.3155 0.0423 0.0000 219.3740 003
CH4 N2O CO2e
Year tons/yr MT/yr
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2
Unmitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total

2.0 Emissions Summary

2.1 Overall Construction Page 2012 of 4069
Agenda Item #6.4.

Page 4 of 8 ends

Hunter Subdivision Project - Fifth Year - Napa County, Annual

10.80 7.30 20.00 LD_Mix HDT_Mix HHDT

7.30 20.00 LD_Mix HDT_Mix HHDT
Architectural Coating 1 11.00 0.00 0.00
Building Construction 9 55.00 11.00 0.00 10.80
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle
Class
Hauling
Vehicle
Class
Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Architectural Coating Air Compressors 1 6.00 78 0.48
Building Construction Welders 1 8.00 46 0.45
Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Building Construction Generator Sets 1 8.00 84 0.74
Building Construction Forklifts 3 8.00 89 0.20
Load Factor
Building Construction Cranes 1 7.00 231 0.29
Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
Residential Indoor: 36,855; Residential Outdoor: 12,285; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power 150
2 Architectural Coating Architectural Coating 10/16/2027 11/10/2027 5 18 End Date Num Days
Week
Num Days Phase Description
1 Building Construction Building Construction 3/22/2027 10/15/2027 5

3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date

Page 2013 of 4069 ends

Agenda Item #6.4.

Page 5 of 8 ends

Hunter Subdivision Project - Fifth Year - Napa County, Annual

0.0000 41.5614 41.5614 1.3200e0030.0380 2.5000e- 0.0000 41.5944 004

0.0383 0.0102 2.4000e004Total 0.0116 0.0680 0.0810 4.5000e- 0.0105 004

0.0000 21.5249 21.5249 3.7000e0040.0326 1.8000e- 0.0000 21.5342 004

0.0328 8.6700e0031.7000e0048.8400e003Worker 9.9000e0035.5700e0030.0657 2.4000e004

0.0000 20.0365 20.0365 9.5000e0045.4100e- 0.0000 20.0601 003

7.0000e0055.4800e0031.5600e0037.0000e0051.6300e003Vendor 1.6900e0030.0625 0.0153 2.1000e004 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Total 0.1026 0.9352 1.2064 2.0200e- 0.0396 0.0396 0.0372 0.0372 0.0000 173.9396 173.9396 0.0409 0.0000 174.9618 003
Off-Road 0.1026 0.9352 1.2064 2.0200e- 0.0396 0.0396 0.0372 0.0372 0.0000 173.9396 173.9396 0.0409 0.0000 174.9618 003
NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2

3.1 Mitigation Measures Construction

3.2 Building Construction - 2027
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10

Page 2014 of 4069 ends

Agenda Item #6.4.

Page 6 of 8 ends

Hunter Subdivision Project - Fifth Year - Napa County, Annual

0.0000 41.5614 41.5614 1.3200e0030.0380 2.5000e- 0.0000 41.5944 004

0.0383 0.0102 2.4000e004Total 0.0116 0.0680 0.0810 4.5000e- 0.0105 004

0.0000 21.5249 21.5249 3.7000e0040.0326 1.8000e- 0.0000 21.5342 004

0.0328 8.6700e0031.7000e0048.8400e003Worker 9.9000e0035.5700e0030.0657 2.4000e004

0.0000 20.0365 20.0365 9.5000e0045.4100e- 0.0000 20.0601 003

7.0000e0055.4800e0031.5600e0037.0000e0051.6300e003Vendor 1.6900e0030.0625 0.0153 2.1000e004 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Total 0.1026 0.9352 1.2064 2.0200e- 0.0396 0.0396 0.0372 0.0372 0.0000 173.9394 173.9394 0.0409 0.0000 174.9616 003
Off-Road 0.1026 0.9352 1.2064 2.0200e- 0.0396 0.0396 0.0372 0.0372 0.0000 173.9394 173.9394 0.0409 0.0000 174.9616 003
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

Page 2015 of 4069 ends

Agenda Item #6.4.

Page 7 of 8 ends

Hunter Subdivision Project - Fifth Year - Napa County, Annual

0.0000 0.5166 0.5166 1.0000e0057.8000e- 0.0000 0.5168
004

0.0000 7.9000e0042.1000e0040.0000 2.1000e004Total 2.4000e0041.3000e0041.5800e0031.0000e005

0.0000 0.5166 0.5166 1.0000e0057.8000e- 0.0000 0.5168
004

0.0000 7.9000e0042.1000e0040.0000 2.1000e004Worker 2.4000e0041.3000e0041.5800e0031.0000e005 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

0.0000 2.2979 2.2979 1.3000e0044.6000e- 0.0000 2.3011
004

4.6000e0044.6000e0044.6000e004Total 0.1297 0.0103 0.0163 3.0000e005

0.0000 2.2979 2.2979 1.3000e0044.6000e- 0.0000 2.3011
004

4.6000e0044.6000e0044.6000e004Off-Road 1.5400e0030.0103 0.0163 3.0000e005 Archit. Coating 0.1281 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2

3.3 Architectural Coating - 2027
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

Page 2016 of 4069 ends

Agenda Item #6.4.

Page 8 of 8 ends

Hunter Subdivision Project - Fifth Year - Napa County, Annual

0.0000 0.5166 0.5166 1.0000e0057.8000e- 0.0000 0.5168
004

0.0000 7.9000e0042.1000e0040.0000 2.1000e004Total 2.4000e0041.3000e0041.5800e0031.0000e005

0.0000 0.5166 0.5166 1.0000e0057.8000e- 0.0000 0.5168
004

0.0000 7.9000e0042.1000e0040.0000 2.1000e004Worker 2.4000e0041.3000e0041.5800e0031.0000e005 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

0.0000 2.2979 2.2979 1.3000e0044.6000e- 0.0000 2.3011
004

4.6000e0044.6000e0044.6000e004Total 0.1297 0.0103 0.0163 3.0000e005

0.0000 2.2979 2.2979 1.3000e0044.6000e- 0.0000 2.3011
004

4.6000e0044.6000e0044.6000e004Off-Road 1.5400e0030.0103 0.0163 3.0000e005 Archit. Coating 0.1281 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

Page 2017 of 4069 ends

Agenda Item #6.4.

Page 1 of 8 ends

Hunter Subdivision Project - Fifth Year - Napa County, Summer Off-road Equipment - Default equipment assumed.

Trips and VMT - Assumed same trips for construction of all res dwelling units.

Grading - Assumed site would be balanced.

1.3 User Entered Comments & Non-Default Data
Project Characteristics - Hunter Subdivision Project. BAAQMD.

Land Use - Construction of 9 SF residences and 2 ADUs. Updated population per City of St Helena avg household size per BayAreaCensus.

Construction Phase - Assumed project would begin construction Spring 2027 (March), with completion in November 2027.

Off-road Equipment - Default equipment assumed.

Off-road Equipment - Default equipment assumed.

CO2 Intensity
(lb/MWhr)
641.35 CH4 Intensity
(lb/MWhr)

0.029 N2O Intensity
(lb/MWhr)

0.006
64 Climate Zone 4 Operational Year 2028
Utility Company Pacific Gas & Electric Company

1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 3.6 Precipitation Freq (Days) Single Family Housing 9.00 Dwelling Unit 2.92 16,200.00 22 Floor Surface Area Population
Apartments Low Rise 2.00 Dwelling Unit 0.13 2,000.00 5

1.0 Project Characteristics

1.1 Land Usage
Land Uses Size Metric Lot Acreage
CalEEMod Version: CalEEMod.2016.3.2
Date: 3/3/2021 10:40 AM
Hunter Subdivision Project - Fifth Year
Napa County, Summer

Page 2018 of 4069 ends

Agenda Item #6.4.

Page 2 of 8 ends

Hunter Subdivision Project - Fifth Year - Napa County, Summer tblTripsAndVMT WorkerTripNumber 1.00 11.00
tblTripsAndVMT VendorTripNumber 1.00 11.00
tblTripsAndVMT WorkerTripNumber 5.00 55.00
tblLandUse Population 6.00 5.00
tblLandUse Population 26.00 22.00
tblConstructionPhase PhaseEndDate 2/4/2028 10/15/2027
tblConstructionPhase PhaseStartDate 2/5/2028 10/16/2027 tblConstructionPhase NumDays 230.00 150.00
tblConstructionPhase PhaseEndDate 3/1/2028 11/10/2027
Table Name Column Name Default Value New Value

Page 2019 of 4069 ends

Agenda Item #6.4.

Page 3 of 8 ends

Hunter Subdivision Project - Fifth Year - Napa County, Summer

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction

0.00 0.00 0.00 0.00
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
ROG NOx CO SO2 Fugitive Bio- CO2
PM10

0.0000 3,192.295
1 3,192.295
1 0.6202 0.0000 3,207.800
4 Maximum 14.4337 13.3612 17.2299 0.0332 0.5262 0.5309 1.0571 0.1413 0.4994 0.6406

0.0000 3,192.295
1 3,192.295
1 0.6202 0.0000 3,207.800
4 2027 14.4337 13.3612 17.2299 0.0332 0.5262 0.5309 1.0571 0.1413 0.4994 0.6406 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

0.0000 3,192.295
1 3,192.295
1 0.6202 0.0000 3,207.800
4 Maximum 14.4337 13.3612 17.2299 0.0332 0.5262 0.5309 1.0571 0.1413 0.4994 0.6406

0.0000 3,192.295
1 3,192.295
1 0.6202 0.0000 3,207.800
4 2027 14.4337 13.3612 17.2299 0.0332 0.5262 0.5309 1.0571 0.1413 0.4994 0.6406 CH4 N2O CO2e
Year lb/day lb/day
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2
Unmitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total

2.0 Emissions Summary

2.1 Overall Construction (Maximum Daily Emission) Page 2020 of 4069 Agenda Item #6.4.

Page 4 of 8 ends

Hunter Subdivision Project - Fifth Year - Napa County, Summer

10.80 7.30 20.00 LD_Mix HDT_Mix HHDT

7.30 20.00 LD_Mix HDT_Mix HHDT
Architectural Coating 1 11.00 0.00 0.00
Building Construction 9 55.00 11.00 0.00 10.80
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle
Class
Hauling
Vehicle
Class
Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Architectural Coating Air Compressors 1 6.00 78 0.48
Building Construction Welders 1 8.00 46 0.45
Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Building Construction Generator Sets 1 8.00 84 0.74
Building Construction Forklifts 3 8.00 89 0.20
Load Factor
Building Construction Cranes 1 7.00 231 0.29
Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
Residential Indoor: 36,855; Residential Outdoor: 12,285; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area:

OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power 150
2 Architectural Coating Architectural Coating 10/16/2027 11/10/2027 5 18 End Date Num Days
Week
Num Days Phase Description
1 Building Construction Building Construction 3/22/2027 10/15/2027 5

3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date

Page 2021 of 4069 ends

Agenda Item #6.4.

Page 5 of 8 ends

Hunter Subdivision Project - Fifth Year - Napa County, Summer

0.5262 3.3500e- 635.8208 635.8208 0.0193 636.3023
003

0.5296 0.1413 3.1200e003Total 0.1600 0.8916 1.1452 6.1900e- 0.1444 003
338.3236 338.3236 5.8600e0030.4518 2.4200e- 338.4700
003

0.4542 0.1198 2.2300e003Worker 0.1380 0.0653 0.9530 3.3900e- 0.1221 003

0.0744 9.3000e- 297.4972 297.4972 0.0134 297.8323
004

0.0754 0.0214 8.9000e004Vendor 0.0220 0.8263 0.1922 2.8000e- 0.0223 003
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
2,556.474
4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474
4 2,556.474
4 0.6010 2,571.498
1 Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2

3.1 Mitigation Measures Construction

3.2 Building Construction - 2027
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10

Page 2022 of 4069 ends

Agenda Item #6.4.

Page 6 of 8 ends

Hunter Subdivision Project - Fifth Year - Napa County, Summer

0.5262 3.3500e- 635.8208 635.8208 0.0193 636.3023
003

0.5296 0.1413 3.1200e003Total 0.1600 0.8916 1.1452 6.1900e- 0.1444 003
338.3236 338.3236 5.8600e0030.4518 2.4200e- 338.4700
003

0.4542 0.1198 2.2300e003Worker 0.1380 0.0653 0.9530 3.3900e- 0.1221 003

0.0744 9.3000e- 297.4972 297.4972 0.0134 297.8323
004

0.0754 0.0214 8.9000e004Vendor 0.0220 0.8263 0.1922 2.8000e- 0.0223 003
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

0.0000 2,556.474
4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963

0.0000 2,556.474
4 2,556.474
4 0.6010 2,571.498
1 Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

Page 2023 of 4069 ends

Agenda Item #6.4.

Page 7 of 8 ends

Hunter Subdivision Project - Fifth Year - Napa County, Summer

67.6647 67.6647 1.1700e0030.0904 4.8000e- 67.6940
004

0.0909 0.0240 4.5000e004Total 0.0276 0.0131 0.1906 6.8000e- 0.0244 004

67.6647 67.6647 1.1700e0030.0904 4.8000e- 67.6940
004

0.0909 0.0240 4.5000e004Worker 0.0276 0.0131 0.1906 6.8000e- 0.0244 004
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Total 14.4061 1.1455 1.8091 2.9700e- 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 003
Off-Road 0.1709 1.1455 1.8091 2.9700e- 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 003
Archit. Coating 14.2352 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2

3.3 Architectural Coating - 2027
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

Page 2024 of 4069 ends

Agenda Item #6.4.

Page 8 of 8 ends

Hunter Subdivision Project - Fifth Year - Napa County, Summer

67.6647 67.6647 1.1700e0030.0904 4.8000e- 67.6940
004

0.0909 0.0240 4.5000e004Total 0.0276 0.0131 0.1906 6.8000e- 0.0244 004

67.6647 67.6647 1.1700e0030.0904 4.8000e- 67.6940
004

0.0909 0.0240 4.5000e004Worker 0.0276 0.0131 0.1906 6.8000e- 0.0244 004
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Total 14.4061 1.1455 1.8091 2.9700e- 0.0515 0.0515 0.0515 0.0515 0.0000 281.4481 281.4481 0.0154 281.8319 003
Off-Road 0.1709 1.1455 1.8091 2.9700e- 0.0515 0.0515 0.0515 0.0515 0.0000 281.4481 281.4481 0.0154 281.8319 003
Archit. Coating 14.2352 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

Page 2025 of 4069 ends

Agenda Item #6.4.

Page 1 of 8 ends

Hunter Subdivision Project - Fifth Year - Napa County, Winter Off-road Equipment - Default equipment assumed.

Trips and VMT - Assumed same trips for construction of all res dwelling units.

Grading - Assumed site would be balanced.

1.3 User Entered Comments & Non-Default Data
Project Characteristics - Hunter Subdivision Project. BAAQMD.

Land Use - Construction of 9 SF residences and 2 ADUs. Updated population per City of St Helena avg household size per BayAreaCensus.

Construction Phase - Assumed project would begin construction Spring 2027 (March), with completion in November 2027.

Off-road Equipment - Default equipment assumed.

Off-road Equipment - Default equipment assumed.

CO2 Intensity
(lb/MWhr)
641.35 CH4 Intensity
(lb/MWhr)

0.029 N2O Intensity
(lb/MWhr)

0.006
64 Climate Zone 4 Operational Year 2028
Utility Company Pacific Gas & Electric Company

1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 3.6 Precipitation Freq (Days) Single Family Housing 9.00 Dwelling Unit 2.92 16,200.00 22 Floor Surface Area Population
Apartments Low Rise 2.00 Dwelling Unit 0.13 2,000.00 5

1.0 Project Characteristics

1.1 Land Usage
Land Uses Size Metric Lot Acreage
CalEEMod Version: CalEEMod.2016.3.2
Date: 3/3/2021 10:42 AM
Hunter Subdivision Project - Fifth Year
Napa County, Winter

Page 2026 of 4069 ends

Agenda Item #6.4.

Page 2 of 8 ends

Hunter Subdivision Project - Fifth Year - Napa County, Winter tblTripsAndVMT WorkerTripNumber 1.00 11.00
tblTripsAndVMT VendorTripNumber 1.00 11.00
tblTripsAndVMT WorkerTripNumber 5.00 55.00
tblLandUse Population 6.00 5.00
tblLandUse Population 26.00 22.00
tblConstructionPhase PhaseEndDate 2/4/2028 10/15/2027
tblConstructionPhase PhaseStartDate 2/5/2028 10/16/2027 tblConstructionPhase NumDays 230.00 150.00
tblConstructionPhase PhaseEndDate 3/1/2028 11/10/2027
Table Name Column Name Default Value New Value

Page 2027 of 4069 ends

Agenda Item #6.4.

Page 3 of 8 ends

Hunter Subdivision Project - Fifth Year - Napa County, Winter

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction

0.00 0.00 0.00 0.00
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
ROG NOx CO SO2 Fugitive Bio- CO2
PM10

0.0000 3,159.737
8 3,159.737
8 0.6209 0.0000 3,175.261
1 Maximum 14.4354 13.3830 17.2053 0.0328 0.5262 0.5309 1.0572 0.1413 0.4994 0.6407

0.0000 3,159.737
8 3,159.737
8 0.6209 0.0000 3,175.261
1 2027 14.4354 13.3830 17.2053 0.0328 0.5262 0.5309 1.0572 0.1413 0.4994 0.6407 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

0.0000 3,159.737
8 3,159.737
8 0.6209 0.0000 3,175.261
1 Maximum 14.4354 13.3830 17.2053 0.0328 0.5262 0.5309 1.0572 0.1413 0.4994 0.6407

0.0000 3,159.737
8 3,159.737
8 0.6209 0.0000 3,175.261
1 2027 14.4354 13.3830 17.2053 0.0328 0.5262 0.5309 1.0572 0.1413 0.4994 0.6407 CH4 N2O CO2e
Year lb/day lb/day
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2
Unmitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total

2.0 Emissions Summary

2.1 Overall Construction (Maximum Daily Emission) Page 2028 of 4069 Agenda Item #6.4.

Page 4 of 8 ends

Hunter Subdivision Project - Fifth Year - Napa County, Winter

10.80 7.30 20.00 LD_Mix HDT_Mix HHDT

7.30 20.00 LD_Mix HDT_Mix HHDT
Architectural Coating 1 11.00 0.00 0.00
Building Construction 9 55.00 11.00 0.00 10.80
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle
Class
Hauling
Vehicle
Class
Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Architectural Coating Air Compressors 1 6.00 78 0.48
Building Construction Welders 1 8.00 46 0.45
Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Building Construction Generator Sets 1 8.00 84 0.74
Building Construction Forklifts 3 8.00 89 0.20
Load Factor
Building Construction Cranes 1 7.00 231 0.29
Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
Residential Indoor: 36,855; Residential Outdoor: 12,285; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area:

OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power 150
2 Architectural Coating Architectural Coating 10/16/2027 11/10/2027 5 18 End Date Num Days
Week
Num Days Phase Description
1 Building Construction Building Construction 3/22/2027 10/15/2027 5

3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date

Page 2029 of 4069 ends

Agenda Item #6.4.

Page 5 of 8 ends

Hunter Subdivision Project - Fifth Year - Napa County, Winter

0.5262 3.3800e- 603.2634 603.2634 0.0200 603.7630
003

0.5296 0.1413 3.1500e003Total 0.1698 0.9133 1.1206 5.8700e- 0.1444 003
312.9329 312.9329 5.4500e0030.4518 2.4200e- 313.0691
003

0.4542 0.1198 2.2300e003Worker 0.1465 0.0827 0.9013 3.1400e- 0.1221 003

0.0744 9.6000e- 290.3305 290.3305 0.0145 290.6939
004

0.0754 0.0214 9.2000e004Vendor 0.0234 0.8306 0.2193 2.7300e- 0.0223 003
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
2,556.474
4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474
4 2,556.474
4 0.6010 2,571.498
1 Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2

3.1 Mitigation Measures Construction

3.2 Building Construction - 2027
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10

Page 2030 of 4069 ends

Agenda Item #6.4.

Page 6 of 8 ends

Hunter Subdivision Project - Fifth Year - Napa County, Winter

0.5262 3.3800e- 603.2634 603.2634 0.0200 603.7630
003

0.5296 0.1413 3.1500e003Total 0.1698 0.9133 1.1206 5.8700e- 0.1444 003
312.9329 312.9329 5.4500e0030.4518 2.4200e- 313.0691
003

0.4542 0.1198 2.2300e003Worker 0.1465 0.0827 0.9013 3.1400e- 0.1221 003

0.0744 9.6000e- 290.3305 290.3305 0.0145 290.6939
004

0.0754 0.0214 9.2000e004Vendor 0.0234 0.8306 0.2193 2.7300e- 0.0223 003
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

0.0000 2,556.474
4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963

0.0000 2,556.474
4 2,556.474
4 0.6010 2,571.498
1 Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

Page 2031 of 4069 ends

Agenda Item #6.4.

Page 7 of 8 ends

Hunter Subdivision Project - Fifth Year - Napa County, Winter

62.5866 62.5866 1.0900e0030.0904 4.8000e- 62.6138
004

0.0909 0.0240 4.5000e004Total 0.0293 0.0166 0.1803 6.3000e- 0.0244 004

62.5866 62.5866 1.0900e0030.0904 4.8000e- 62.6138
004

0.0909 0.0240 4.5000e004Worker 0.0293 0.0166 0.1803 6.3000e- 0.0244 004
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Total 14.4061 1.1455 1.8091 2.9700e- 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 003
Off-Road 0.1709 1.1455 1.8091 2.9700e- 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 003
Archit. Coating 14.2352 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2

3.3 Architectural Coating - 2027
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

Page 2032 of 4069 ends

Agenda Item #6.4.

Page 8 of 8 ends

Hunter Subdivision Project - Fifth Year - Napa County, Winter

62.5866 62.5866 1.0900e0030.0904 4.8000e- 62.6138
004

0.0909 0.0240 4.5000e004Total 0.0293 0.0166 0.1803 6.3000e- 0.0244 004

62.5866 62.5866 1.0900e0030.0904 4.8000e- 62.6138
004

0.0909 0.0240 4.5000e004Worker 0.0293 0.0166 0.1803 6.3000e- 0.0244 004
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Total 14.4061 1.1455 1.8091 2.9700e- 0.0515 0.0515 0.0515 0.0515 0.0000 281.4481 281.4481 0.0154 281.8319 003
Off-Road 0.1709 1.1455 1.8091 2.9700e- 0.0515 0.0515 0.0515 0.0515 0.0000 281.4481 281.4481 0.0154 281.8319 003
Archit. Coating 14.2352 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

Page 2033 of 4069 ends

Agenda Item #6.4.

Page 1 of 8 ends

Hunter Subdivision Project - Sixth Year - Napa County, Annual Off-road Equipment - Default equipment assumed.

Trips and VMT - Assumed same trips for construction of all res dwelling units.

Grading - Assumed site would be balanced.

1.3 User Entered Comments & Non-Default Data
Project Characteristics - Hunter Subdivision Project. BAAQMD.

Land Use - Construction of 6 SF residences and 1 ADU. Updated population per City of St Helena avg household size per BayAreaCensus.

Construction Phase - Assumed project would begin construction Spring 2028 (March), with completion in November 2028.

Off-road Equipment - Default equipment assumed.

Off-road Equipment - Default equipment assumed.

CO2 Intensity
(lb/MWhr)
641.35 CH4 Intensity
(lb/MWhr)

0.029 N2O Intensity
(lb/MWhr)

0.006
64 Climate Zone 4 Operational Year 2029
Utility Company Pacific Gas & Electric Company

1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 3.6 Precipitation Freq (Days) Single Family Housing 6.00 Dwelling Unit 1.95 10,800.00 15 Floor Surface Area Population
Apartments Low Rise 1.00 Dwelling Unit 0.06 1,000.00 3

1.0 Project Characteristics

1.1 Land Usage
Land Uses Size Metric Lot Acreage
CalEEMod Version: CalEEMod.2016.3.2
Date: 3/3/2021 10:48 AM
Hunter Subdivision Project - Sixth Year
Napa County, Annual

Page 2034 of 4069 ends

Agenda Item #6.4.

Page 2 of 8 ends

Hunter Subdivision Project - Sixth Year - Napa County, Annual tblTripsAndVMT WorkerTripNumber 1.00 11.00
tblTripsAndVMT VendorTripNumber 1.00 11.00
tblTripsAndVMT WorkerTripNumber 3.00 55.00
tblConstructionPhase PhaseStartDate 1/20/2029 10/14/2028 tblLandUse Population 17.00 15.00
tblConstructionPhase PhaseEndDate 2/2/2029 11/8/2028
tblConstructionPhase PhaseEndDate 1/19/2029 10/13/2028
tblConstructionPhase NumDays 10.00 18.00
tblConstructionPhase NumDays 220.00 150.00
Table Name Column Name Default Value New Value

Page 2035 of 4069 ends

Agenda Item #6.4.

Page 3 of 8 ends

Hunter Subdivision Project - Sixth Year - Napa County, Annual

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction

0.00 0.00 0.00 0.00
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
ROG NOx CO SO2 Fugitive Bio- CO2
PM10
Maximum 0.2074 0.9791 1.1444 2.3500e- 0.0388 0.0360 0.0747 0.0104 0.0344 0.0449 0.0000 199.3905 199.3905 0.0300 0.0000 200.1403 003
2028 0.2074 0.9791 1.1444 2.3500e- 0.0388 0.0360 0.0747 0.0104 0.0344 0.0449 0.0000 199.3905 199.3905 0.0300 0.0000 200.1403 003
Total CO2 CH4 N2O CO2e
Year tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Maximum 0.2074 0.9791 1.1444 2.3500e- 0.0388 0.0360 0.0747 0.0104 0.0344 0.0449 0.0000 199.3906 199.3906 0.0300 0.0000 200.1405 003
2028 0.2074 0.9791 1.1444 2.3500e- 0.0388 0.0360 0.0747 0.0104 0.0344 0.0449 0.0000 199.3906 199.3906 0.0300 0.0000 200.1405 003
CH4 N2O CO2e
Year tons/yr MT/yr
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2
Unmitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total

2.0 Emissions Summary

2.1 Overall Construction Page 2036 of 4069
Agenda Item #6.4.

Page 4 of 8 ends

Hunter Subdivision Project - Sixth Year - Napa County, Annual

10.80 7.30 20.00 LD_Mix HDT_Mix HHDT

7.30 20.00 LD_Mix HDT_Mix HHDT
Architectural Coating 1 11.00 0.00 0.00
Building Construction 8 55.00 11.00 0.00 10.80
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle
Class
Hauling
Vehicle
Class
Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Architectural Coating Air Compressors 1 6.00 78 0.48
Building Construction Welders 3 8.00 46 0.45
Building Construction Tractors/Loaders/Backhoes 1 6.00 97 0.37 Building Construction Generator Sets 1 8.00 84 0.74
Building Construction Forklifts 2 7.00 89 0.20
Load Factor
Building Construction Cranes 1 8.00 231 0.29
Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
Residential Indoor: 23,895; Residential Outdoor: 7,965; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area:

OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power 150
2 Architectural Coating Architectural Coating 10/14/2028 11/8/2028 5 18 End Date Num Days
Week
Num Days Phase Description
1 Building Construction Building Construction 3/20/2028 10/13/2028 5

3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date

Page 2037 of 4069 ends

Agenda Item #6.4.

Page 5 of 8 ends

Hunter Subdivision Project - Sixth Year - Napa County, Annual

0.0000 40.7911 40.7911 1.2900e0030.0380 2.4000e- 0.0000 40.8233 004

0.0382 0.0102 2.2000e004Total 0.0109 0.0669 0.0761 4.4000e- 0.0105 004

0.0000 20.8369 20.8369 3.4000e0040.0326 1.7000e- 0.0000 20.8454 004

0.0328 8.6700e0031.5000e0048.8300e003Worker 9.2400e0035.0900e0030.0612 2.3000e004

0.0000 19.9543 19.9543 9.5000e0045.4100e- 0.0000 19.9779 003

7.0000e0055.4800e0031.5600e0037.0000e0051.6300e003Vendor 1.6400e0030.0618 0.0148 2.1000e004 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Total 0.1117 0.9018 1.0505 1.8800e- 0.0353 0.0353 0.0337 0.0337 0.0000 155.8015 155.8015 0.0286 0.0000 156.5158 003
Off-Road 0.1117 0.9018 1.0505 1.8800e- 0.0353 0.0353 0.0337 0.0337 0.0000 155.8015 155.8015 0.0286 0.0000 156.5158 003
NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2

3.1 Mitigation Measures Construction

3.2 Building Construction - 2028
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10

Page 2038 of 4069 ends

Agenda Item #6.4.

Page 6 of 8 ends

Hunter Subdivision Project - Sixth Year - Napa County, Annual

0.0000 40.7911 40.7911 1.2900e0030.0380 2.4000e- 0.0000 40.8233 004

0.0382 0.0102 2.2000e004Total 0.0109 0.0669 0.0761 4.4000e- 0.0105 004

0.0000 20.8369 20.8369 3.4000e0040.0326 1.7000e- 0.0000 20.8454 004

0.0328 8.6700e0031.5000e0048.8300e003Worker 9.2400e0035.0900e0030.0612 2.3000e004

0.0000 19.9543 19.9543 9.5000e0045.4100e- 0.0000 19.9779 003

7.0000e0055.4800e0031.5600e0037.0000e0051.6300e003Vendor 1.6400e0030.0618 0.0148 2.1000e004 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Total 0.1117 0.9018 1.0505 1.8800e- 0.0353 0.0353 0.0337 0.0337 0.0000 155.8013 155.8013 0.0286 0.0000 156.5156 003
Off-Road 0.1117 0.9018 1.0505 1.8800e- 0.0353 0.0353 0.0337 0.0337 0.0000 155.8013 155.8013 0.0286 0.0000 156.5156 003
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

Page 2039 of 4069 ends

Agenda Item #6.4.

Page 7 of 8 ends

Hunter Subdivision Project - Sixth Year - Napa County, Annual

0.0000 0.5001 0.5001 1.0000e0057.8000e- 0.0000 0.5003
004

0.0000 7.9000e0042.1000e0040.0000 2.1000e004Total 2.2000e0041.2000e0041.4700e0031.0000e005

0.0000 0.5001 0.5001 1.0000e0057.8000e- 0.0000 0.5003
004

0.0000 7.9000e0042.1000e0040.0000 2.1000e004Worker 2.2000e0041.2000e0041.4700e0031.0000e005 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

0.0000 2.2979 2.2979 1.3000e0044.6000e- 0.0000 2.3011
004

4.6000e0044.6000e0044.6000e004Total 0.0846 0.0103 0.0163 3.0000e005

0.0000 2.2979 2.2979 1.3000e0044.6000e- 0.0000 2.3011
004

4.6000e0044.6000e0044.6000e004Off-Road 1.5400e0030.0103 0.0163 3.0000e005 Archit. Coating 0.0831 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2

3.3 Architectural Coating - 2028
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

Page 2040 of 4069 ends

Agenda Item #6.4.

Page 8 of 8 ends

Hunter Subdivision Project - Sixth Year - Napa County, Annual

0.0000 0.5001 0.5001 1.0000e0057.8000e- 0.0000 0.5003
004

0.0000 7.9000e0042.1000e0040.0000 2.1000e004Total 2.2000e0041.2000e0041.4700e0031.0000e005

0.0000 0.5001 0.5001 1.0000e0057.8000e- 0.0000 0.5003
004

0.0000 7.9000e0042.1000e0040.0000 2.1000e004Worker 2.2000e0041.2000e0041.4700e0031.0000e005 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

0.0000 2.2979 2.2979 1.3000e0044.6000e- 0.0000 2.3011
004

4.6000e0044.6000e0044.6000e004Total 0.0846 0.0103 0.0163 3.0000e005

0.0000 2.2979 2.2979 1.3000e0044.6000e- 0.0000 2.3011
004

4.6000e0044.6000e0044.6000e004Off-Road 1.5400e0030.0103 0.0163 3.0000e005 Archit. Coating 0.0831 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

Page 2041 of 4069 ends

Agenda Item #6.4.

Page 1 of 8 ends

Hunter Subdivision Project - Sixth Year - Napa County, Summer Off-road Equipment - Default equipment assumed.

Trips and VMT - Assumed same trips for construction of all res dwelling units.

Grading - Assumed site would be balanced.

1.3 User Entered Comments & Non-Default Data
Project Characteristics - Hunter Subdivision Project. BAAQMD.

Land Use - Construction of 6 SF residences and 1 ADU. Updated population per City of St Helena avg household size per BayAreaCensus.

Construction Phase - Assumed project would begin construction Spring 2028 (March), with completion in November 2028.

Off-road Equipment - Default equipment assumed.

Off-road Equipment - Default equipment assumed.

CO2 Intensity
(lb/MWhr)
641.35 CH4 Intensity
(lb/MWhr)

0.029 N2O Intensity
(lb/MWhr)

0.006
64 Climate Zone 4 Operational Year 2029
Utility Company Pacific Gas & Electric Company

1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 3.6 Precipitation Freq (Days) Single Family Housing 6.00 Dwelling Unit 1.95 10,800.00 15 Floor Surface Area Population
Apartments Low Rise 1.00 Dwelling Unit 0.06 1,000.00 3

1.0 Project Characteristics

1.1 Land Usage
Land Uses Size Metric Lot Acreage
CalEEMod Version: CalEEMod.2016.3.2
Date: 3/3/2021 10:50 AM
Hunter Subdivision Project - Sixth Year
Napa County, Summer

Page 2042 of 4069 ends

Agenda Item #6.4.

Page 2 of 8 ends

Hunter Subdivision Project - Sixth Year - Napa County, Summer tblTripsAndVMT WorkerTripNumber 1.00 11.00
tblTripsAndVMT VendorTripNumber 1.00 11.00
tblTripsAndVMT WorkerTripNumber 3.00 55.00
tblConstructionPhase PhaseStartDate 1/20/2029 10/14/2028 tblLandUse Population 17.00 15.00
tblConstructionPhase PhaseEndDate 2/2/2029 11/8/2028
tblConstructionPhase PhaseEndDate 1/19/2029 10/13/2028
tblConstructionPhase NumDays 10.00 18.00
tblConstructionPhase NumDays 220.00 150.00
Table Name Column Name Default Value New Value

Page 2043 of 4069 ends

Agenda Item #6.4.

Page 3 of 8 ends

Hunter Subdivision Project - Sixth Year - Napa County, Summer

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction

0.00 0.00 0.00 0.00
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
ROG NOx CO SO2 Fugitive Bio- CO2
PM10

0.0000 2,913.691
8 2,913.691
8 0.4387 0.0000 2,924.659
9 Maximum 9.4261 12.9011 15.0836 0.0311 0.5262 0.4731 0.9994 0.1413 0.4527 0.5940

0.0000 2,913.691
8 2,913.691
8 0.4387 0.0000 2,924.659
9 2028 9.4261 12.9011 15.0836 0.0311 0.5262 0.4731 0.9994 0.1413 0.4527 0.5940 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

0.0000 2,913.691
8 2,913.691
8 0.4387 0.0000 2,924.659
9 Maximum 9.4261 12.9011 15.0836 0.0311 0.5262 0.4731 0.9994 0.1413 0.4527 0.5940

0.0000 2,913.691
8 2,913.691
8 0.4387 0.0000 2,924.659
9 2028 9.4261 12.9011 15.0836 0.0311 0.5262 0.4731 0.9994 0.1413 0.4527 0.5940 CH4 N2O CO2e
Year lb/day lb/day
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2
Unmitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total

2.0 Emissions Summary

2.1 Overall Construction (Maximum Daily Emission) Page 2044 of 4069 Agenda Item #6.4.

Page 4 of 8 ends

Hunter Subdivision Project - Sixth Year - Napa County, Summer

10.80 7.30 20.00 LD_Mix HDT_Mix HHDT

7.30 20.00 LD_Mix HDT_Mix HHDT
Architectural Coating 1 11.00 0.00 0.00
Building Construction 8 55.00 11.00 0.00 10.80
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle
Class
Hauling
Vehicle
Class
Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Architectural Coating Air Compressors 1 6.00 78 0.48
Building Construction Welders 3 8.00 46 0.45
Building Construction Tractors/Loaders/Backhoes 1 6.00 97 0.37 Building Construction Generator Sets 1 8.00 84 0.74
Building Construction Forklifts 2 7.00 89 0.20
Load Factor
Building Construction Cranes 1 8.00 231 0.29
Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
Residential Indoor: 23,895; Residential Outdoor: 7,965; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area:

OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power 150
2 Architectural Coating Architectural Coating 10/14/2028 11/8/2028 5 18 End Date Num Days
Week
Num Days Phase Description
1 Building Construction Building Construction 3/20/2028 10/13/2028 5

3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date

Page 2045 of 4069 ends

Agenda Item #6.4.

Page 5 of 8 ends

Hunter Subdivision Project - Sixth Year - Napa County, Summer

0.5262 3.1500e- 623.8020 623.8020 0.0188 624.2712
003

0.5294 0.1413 2.9400e003Total 0.1502 0.8778 1.0764 6.0700e- 0.1442 003
327.5292 327.5292 5.3400e0030.4518 2.2400e- 327.6628
003

0.4541 0.1198 2.0700e003Worker 0.1288 0.0597 0.8904 3.2800e- 0.1219 003

0.0744 9.1000e- 296.2728 296.2728 0.0134 296.6085
004

0.0753 0.0214 8.7000e004Vendor 0.0214 0.8181 0.1860 2.7900e- 0.0223 003
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
2,289.889
8 2,289.889
8 0.4200 2,300.388
7 Total 1.4897 12.0233 14.0072 0.0250 0.4700 0.4700 0.4498 0.4498 2,289.889
8 2,289.889
8 0.4200 2,300.388
7 Off-Road 1.4897 12.0233 14.0072 0.0250 0.4700 0.4700 0.4498 0.4498 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2

3.1 Mitigation Measures Construction

3.2 Building Construction - 2028
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10

Page 2046 of 4069 ends

Agenda Item #6.4.

Page 6 of 8 ends

Hunter Subdivision Project - Sixth Year - Napa County, Summer

0.5262 3.1500e- 623.8020 623.8020 0.0188 624.2712
003

0.5294 0.1413 2.9400e003Total 0.1502 0.8778 1.0764 6.0700e- 0.1442 003
327.5292 327.5292 5.3400e0030.4518 2.2400e- 327.6628
003

0.4541 0.1198 2.0700e003Worker 0.1288 0.0597 0.8904 3.2800e- 0.1219 003

0.0744 9.1000e- 296.2728 296.2728 0.0134 296.6085
004

0.0753 0.0214 8.7000e004Vendor 0.0214 0.8181 0.1860 2.7900e- 0.0223 003
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

0.0000 2,289.889
8 2,289.889
8 0.4200 2,300.388
7 Total 1.4897 12.0233 14.0072 0.0250 0.4700 0.4700 0.4498 0.4498

0.0000 2,289.889
8 2,289.889
8 0.4200 2,300.388
7 Off-Road 1.4897 12.0233 14.0072 0.0250 0.4700 0.4700 0.4498 0.4498 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

Page 2047 of 4069 ends

Agenda Item #6.4.

Page 7 of 8 ends

Hunter Subdivision Project - Sixth Year - Napa County, Summer

65.5058 65.5058 1.0700e0030.0904 4.5000e- 65.5326
004

0.0908 0.0240 4.1000e004Total 0.0258 0.0119 0.1781 6.6000e- 0.0244 004

65.5058 65.5058 1.0700e0030.0904 4.5000e- 65.5326
004

0.0908 0.0240 4.1000e004Worker 0.0258 0.0119 0.1781 6.6000e- 0.0244 004
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Total 9.4003 1.1455 1.8091 2.9700e- 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 003
Off-Road 0.1709 1.1455 1.8091 2.9700e- 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 003
Archit. Coating 9.2294 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2

3.3 Architectural Coating - 2028
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

Page 2048 of 4069 ends

Agenda Item #6.4.

Page 8 of 8 ends

Hunter Subdivision Project - Sixth Year - Napa County, Summer

65.5058 65.5058 1.0700e0030.0904 4.5000e- 65.5326
004

0.0908 0.0240 4.1000e004Total 0.0258 0.0119 0.1781 6.6000e- 0.0244 004

65.5058 65.5058 1.0700e0030.0904 4.5000e- 65.5326
004

0.0908 0.0240 4.1000e004Worker 0.0258 0.0119 0.1781 6.6000e- 0.0244 004
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Total 9.4003 1.1455 1.8091 2.9700e- 0.0515 0.0515 0.0515 0.0515 0.0000 281.4481 281.4481 0.0154 281.8319 003
Off-Road 0.1709 1.1455 1.8091 2.9700e- 0.0515 0.0515 0.0515 0.0515 0.0000 281.4481 281.4481 0.0154 281.8319 003
Archit. Coating 9.2294 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

Page 2049 of 4069 ends

Agenda Item #6.4.

Page 1 of 8 ends

Hunter Subdivision Project - Sixth Year - Napa County, Winter Off-road Equipment - Default equipment assumed.

Trips and VMT - Assumed same trips for construction of all res dwelling units.

Grading - Assumed site would be balanced.

1.3 User Entered Comments & Non-Default Data
Project Characteristics - Hunter Subdivision Project. BAAQMD.

Land Use - Construction of 6 SF residences and 1 ADU. Updated population per City of St Helena avg household size per BayAreaCensus.

Construction Phase - Assumed project would begin construction Spring 2028 (March), with completion in November 2028.

Off-road Equipment - Default equipment assumed.

Off-road Equipment - Default equipment assumed.

CO2 Intensity
(lb/MWhr)
641.35 CH4 Intensity
(lb/MWhr)

0.029 N2O Intensity
(lb/MWhr)

0.006
64 Climate Zone 4 Operational Year 2029
Utility Company Pacific Gas & Electric Company

1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 3.6 Precipitation Freq (Days) Single Family Housing 6.00 Dwelling Unit 1.95 10,800.00 15 Floor Surface Area Population
Apartments Low Rise 1.00 Dwelling Unit 0.06 1,000.00 3

1.0 Project Characteristics

1.1 Land Usage
Land Uses Size Metric Lot Acreage
CalEEMod Version: CalEEMod.2016.3.2
Date: 3/3/2021 10:51 AM
Hunter Subdivision Project - Sixth Year
Napa County, Winter

Page 2050 of 4069 ends

Agenda Item #6.4.

Page 2 of 8 ends

Hunter Subdivision Project - Sixth Year - Napa County, Winter tblTripsAndVMT WorkerTripNumber 1.00 11.00
tblTripsAndVMT VendorTripNumber 1.00 11.00
tblTripsAndVMT WorkerTripNumber 3.00 55.00
tblConstructionPhase PhaseStartDate 1/20/2029 10/14/2028 tblLandUse Population 17.00 15.00
tblConstructionPhase PhaseEndDate 2/2/2029 11/8/2028
tblConstructionPhase PhaseEndDate 1/19/2029 10/13/2028
tblConstructionPhase NumDays 10.00 18.00
tblConstructionPhase NumDays 220.00 150.00
Table Name Column Name Default Value New Value

Page 2051 of 4069 ends

Agenda Item #6.4.

Page 3 of 8 ends

Hunter Subdivision Project - Sixth Year - Napa County, Winter

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction

0.00 0.00 0.00 0.00
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
ROG NOx CO SO2 Fugitive Bio- CO2
PM10

0.0000 2,881.961
3 2,881.961
3 0.4395 0.0000 2,892.948
1 Maximum 9.4277 12.9211 15.0594 0.0308 0.5262 0.4731 0.9994 0.1413 0.4528 0.5940

0.0000 2,881.961
3 2,881.961
3 0.4395 0.0000 2,892.948
1 2028 9.4277 12.9211 15.0594 0.0308 0.5262 0.4731 0.9994 0.1413 0.4528 0.5940 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

0.0000 2,881.961
3 2,881.961
3 0.4395 0.0000 2,892.948
2 Maximum 9.4277 12.9211 15.0594 0.0308 0.5262 0.4731 0.9994 0.1413 0.4528 0.5940

0.0000 2,881.961
3 2,881.961
3 0.4395 0.0000 2,892.948
2 2028 9.4277 12.9211 15.0594 0.0308 0.5262 0.4731 0.9994 0.1413 0.4528 0.5940 CH4 N2O CO2e
Year lb/day lb/day
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2
Unmitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total

2.0 Emissions Summary

2.1 Overall Construction (Maximum Daily Emission) Page 2052 of 4069 Agenda Item #6.4.

Page 4 of 8 ends

Hunter Subdivision Project - Sixth Year - Napa County, Winter

10.80 7.30 20.00 LD_Mix HDT_Mix HHDT

7.30 20.00 LD_Mix HDT_Mix HHDT
Architectural Coating 1 11.00 0.00 0.00
Building Construction 8 55.00 11.00 0.00 10.80
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle
Class
Hauling
Vehicle
Class
Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Architectural Coating Air Compressors 1 6.00 78 0.48
Building Construction Welders 3 8.00 46 0.45
Building Construction Tractors/Loaders/Backhoes 1 6.00 97 0.37 Building Construction Generator Sets 1 8.00 84 0.74
Building Construction Forklifts 2 7.00 89 0.20
Load Factor
Building Construction Cranes 1 8.00 231 0.29
Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
Residential Indoor: 23,895; Residential Outdoor: 7,965; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area:

OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power 150
2 Architectural Coating Architectural Coating 10/14/2028 11/8/2028 5 18 End Date Num Days
Week
Num Days Phase Description
1 Building Construction Building Construction 3/20/2028 10/13/2028 5

3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date

Page 2053 of 4069 ends

Agenda Item #6.4.

Page 5 of 8 ends

Hunter Subdivision Project - Sixth Year - Napa County, Winter

0.5262 3.1700e- 592.0714 592.0714 0.0195 592.5595
003

0.5294 0.1413 2.9600e003Total 0.1597 0.8978 1.0522 5.7600e- 0.1442 003
302.9271 302.9271 4.9600e0030.4518 2.2400e- 303.0511
003

0.4541 0.1198 2.0700e003Worker 0.1369 0.0756 0.8399 3.0400e- 0.1219 003

0.0744 9.3000e- 289.1444 289.1444 0.0146 289.5084
004

0.0754 0.0214 8.9000e004Vendor 0.0227 0.8222 0.2122 2.7200e- 0.0223 003
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
2,289.889
8 2,289.889
8 0.4200 2,300.388
7 Total 1.4897 12.0233 14.0072 0.0250 0.4700 0.4700 0.4498 0.4498 2,289.889
8 2,289.889
8 0.4200 2,300.388
7 Off-Road 1.4897 12.0233 14.0072 0.0250 0.4700 0.4700 0.4498 0.4498 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2

3.1 Mitigation Measures Construction

3.2 Building Construction - 2028
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10

Page 2054 of 4069 ends

Agenda Item #6.4.

Page 6 of 8 ends

Hunter Subdivision Project - Sixth Year - Napa County, Winter

0.5262 3.1700e- 592.0714 592.0714 0.0195 592.5595
003

0.5294 0.1413 2.9600e003Total 0.1597 0.8978 1.0522 5.7600e- 0.1442 003
302.9271 302.9271 4.9600e0030.4518 2.2400e- 303.0511
003

0.4541 0.1198 2.0700e003Worker 0.1369 0.0756 0.8399 3.0400e- 0.1219 003

0.0744 9.3000e- 289.1444 289.1444 0.0146 289.5084
004

0.0754 0.0214 8.9000e004Vendor 0.0227 0.8222 0.2122 2.7200e- 0.0223 003
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

0.0000 2,289.889
8 2,289.889
8 0.4200 2,300.388
7 Total 1.4897 12.0233 14.0072 0.0250 0.4700 0.4700 0.4498 0.4498

0.0000 2,289.889
8 2,289.889
8 0.4200 2,300.388
7 Off-Road 1.4897 12.0233 14.0072 0.0250 0.4700 0.4700 0.4498 0.4498 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

Page 2055 of 4069 ends

Agenda Item #6.4.

Page 7 of 8 ends

Hunter Subdivision Project - Sixth Year - Napa County, Winter

60.5854 60.5854 9.9000e0040.0904 4.5000e- 60.6102
004

0.0908 0.0240 4.1000e004Total 0.0274 0.0151 0.1680 6.1000e- 0.0244 004

60.5854 60.5854 9.9000e0040.0904 4.5000e- 60.6102
004

0.0908 0.0240 4.1000e004Worker 0.0274 0.0151 0.1680 6.1000e- 0.0244 004
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Total 9.4003 1.1455 1.8091 2.9700e- 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 003
Off-Road 0.1709 1.1455 1.8091 2.9700e- 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 003
Archit. Coating 9.2294 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2

3.3 Architectural Coating - 2028
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

Page 2056 of 4069 ends

Agenda Item #6.4.

Page 8 of 8 ends

Hunter Subdivision Project - Sixth Year - Napa County, Winter

60.5854 60.5854 9.9000e0040.0904 4.5000e- 60.6102
004

0.0908 0.0240 4.1000e004Total 0.0274 0.0151 0.1680 6.1000e- 0.0244 004

60.5854 60.5854 9.9000e0040.0904 4.5000e- 60.6102
004

0.0908 0.0240 4.1000e004Worker 0.0274 0.0151 0.1680 6.1000e- 0.0244 004
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Total 9.4003 1.1455 1.8091 2.9700e- 0.0515 0.0515 0.0515 0.0515 0.0000 281.4481 281.4481 0.0154 281.8319 003
Off-Road 0.1709 1.1455 1.8091 2.9700e- 0.0515 0.0515 0.0515 0.0515 0.0000 281.4481 281.4481 0.0154 281.8319 003
Archit. Coating 9.2294 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

Page 2057 of 4069 ends

Agenda Item #6.4.

Page 1 of 13 ends

Hunter Subdivision Project Operations - Napa County, Annual Architectural Coating - Vehicle Trips - Updated trip generation per traffic report (Dudek).

Woodstoves - No woodstoves or hearths.

Area Coating -

1.3 User Entered Comments & Non-Default Data
Project Characteristics - Hunter Subdivision Project. BAAQMD. Adjusted intensity factors based on PG&E 2020 Corporate Responsibility and Sustainability Report, 206 lb CO2/MWh.

Land Use - 87 units including 51 single family homes, 11 granny flats, and 25 multi family residential units. Updated population per City of St Helna avg household size from BayAreaCensus.

CO2 Intensity
(lb/MWhr)
206 CH4 Intensity
(lb/MWhr)

0.029 N2O Intensity
(lb/MWhr)

0.006
64 Climate Zone 4 Operational Year 2029
Utility Company Pacific Gas & Electric Company

1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 3.6 Precipitation Freq (Days) Single Family Housing 51.00 Dwelling Unit 13.40 91,800.00 126 Condo/Townhouse 25.00 Dwelling Unit 3.40 25,000.00 62
Apartments Low Rise 11.00 Dwelling Unit 0.00 11,000.00 27 Floor Surface Area Population
City Park 0.06 Acre 0.06 2,613.60 0

1.0 Project Characteristics

1.1 Land Usage
Land Uses Size Metric Lot Acreage
CalEEMod Version: CalEEMod.2016.3.2
Date: 3/3/2021 4:06 PM
Hunter Subdivision Project
Napa County, Annual

Page 2058 of 4069 ends

Agenda Item #6.4.

Page 2 of 13 ends

Hunter Subdivision Project Operations - Napa County, Annual tblLandUse LotAcreage 0.69 0.00
tblLandUse LotAcreage 1.56 3.40
tblFireplaces NumberWood 4.25 0.00
tblFireplaces NumberWood 21.93 0.00
tblFireplaces NumberNoFireplace 4.08 0.00
tblFireplaces NumberWood 1.87 0.00
tblFireplaces NumberNoFireplace 0.44 0.00
tblFireplaces NumberNoFireplace 1.00 0.00
tblFireplaces NumberGas 3.75 25.00
tblFireplaces NumberGas 12.75 51.00
tblFireplaces FireplaceWoodMass 228.80 0.00
tblFireplaces NumberGas 1.65 11.00
tblFireplaces FireplaceWoodMass 228.80 0.00
tblFireplaces FireplaceWoodMass 228.80 0.00
tblEnergyUse T24NG 15,568.01 14,789.61
tblEnergyUse T24NG 25,910.09 23,578.18
tblEnergyUse T24E 325.76 312.73
tblEnergyUse T24NG 7,043.85 6,409.90
tblEnergyUse T24E 365.68 351.05
tblEnergyUse T24E 249.32 244.33
tblConstructionPhase NumDays 300.00 261.00
tblConstructionPhase NumDays 20.00 65.00
Table Name Column Name Default Value New Value
Solid Waste - Default rates used.

Construction Off-road Equipment Mitigation - Implement fugitive dust reduction measures - water twice daily.

Mobile Land Use Mitigation - Project would implement a pedestrian network on and off-site, project site is approximately 0.4 mi from VINE transit.

Water Mitigation - 20% indoor/outdoor reduction in water assumed for CALGreen compliance.

Energy Use - Adjusted T24 energy intensities to meet 2019 T24 standards. Single-family savings are 4% of electricity and 9% of gas. MF savings are 2% and 5%.

Water And Wastewater - Indoor water consumption updated per Preliminary Water Calculations Technical Memorandum (RSA). Page 2059 of 4069 Agenda Item #6.4.

Page 3 of 13 ends

Hunter Subdivision Project Operations - Napa County, Annual tblWoodstoves WoodstoveWoodMass 582.40 0.00
tblWoodstoves WoodstoveDayYear 14.12 0.00
tblWoodstoves WoodstoveDayYear 21.06 0.00
tblWater OutdoorWaterUseRate 2,094,843.56 2,094,844.00
tblWoodstoves WoodstoveDayYear 14.12 0.00
tblWater OutdoorWaterUseRate 71,488.88 0.00
tblWater OutdoorWaterUseRate 1,026,884.10 1,026,884.00
tblWater IndoorWaterUseRate 1,628,850.64 1,275,310.00
tblWater IndoorWaterUseRate 3,322,855.31 3,492,027.00
tblVehicleTrips WD_TR 9.52 9.44
tblWater IndoorWaterUseRate 716,694.28 1,711,778.00
tblVehicleTrips WD_TR 1.89 0.00
tblVehicleTrips WD_TR 5.81 9.44
tblVehicleTrips SU_TR 8.62 8.31
tblVehicleTrips WD_TR 6.59 7.36
tblVehicleTrips SU_TR 16.74 0.00
tblVehicleTrips SU_TR 4.84 8.31
tblVehicleTrips ST_TR 9.91 9.56
tblVehicleTrips SU_TR 6.07 6.94
tblVehicleTrips ST_TR 22.75 0.00
tblVehicleTrips ST_TR 5.67 9.56
tblTripsAndVMT WorkerTripNumber 9.00 11.00
tblVehicleTrips ST_TR 7.16 8.18
tblTripsAndVMT VendorTripNumber 10.00 11.00
tblTripsAndVMT WorkerTripNumber 45.00 55.00
tblProjectCharacteristics CO2IntensityFactor 641.35 206 tblTripsAndVMT VendorTripNumber 0.00 2.00
tblLandUse Population 72.00 62.00
tblLandUse Population 146.00 126.00
tblLandUse LotAcreage 16.56 13.40
tblLandUse Population 31.00 27.00

Page 2060 of 4069 ends

Agenda Item #6.4.

Page 4 of 13 ends

Hunter Subdivision Project Operations - Napa County, Annual

16.1614 787.4379 803.5993 1.0795 8.7800e003Total 0.7572 0.9440 2.2068 7.2800e- 0.6772 0.0161 0.6933 0.1816 0.0158 0.1974 833.2042 003

2.0555 4.4446 6.5001 0.2118 5.1100e003Water 0.0000 0.0000 0.0000 0.0000 13.3179 Waste 0.0000 0.0000 0.0000 0.0000 14.1058 0.0000 14.1058 0.8336 0.0000 34.9466

0.6772 4.6400e- 0.0000 614.0446 614.0446 0.0232 0.0000 614.6256 003

0.6818 0.1816 4.3300e003Mobile 0.1372 0.8389 1.5198 6.6300e- 0.1859 003

0.0000 157.0326 157.0326 9.6600e0033.4700e0037.1400e- 158.3081 003

7.1400e0037.1400e0037.1400e003Energy 0.0103 0.0883 0.0376 5.6000e004

0.0000 11.9162 11.9162 1.2200e0032.0000e0044.3400e- 12.0060 003

4.3400e0034.3400e0034.3400e003Area 0.6096 0.0168 0.6494 9.0000e005 CH4 N2O CO2e
Category tons/yr MT/yr
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2
Unmitigated Operational
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total

2.2 Overall Operational
tblWoodstoves WoodstoveWoodMass 956.80 0.00

2.0 Emissions Summary
tblWoodstoves WoodstoveWoodMass 582.40 0.00

Page 2061 of 4069 ends

Agenda Item #6.4.

Page 5 of 13 ends

Hunter Subdivision Project Operations - Napa County, Annual

6.6300e- 0.1859 0.0000 614.0446 614.0446 0.0232 0.0000 614.6256 003

0.6772 4.6400e0030.6818 0.1816 4.3300e003
548.6616 548.6616 0.0216 0.0000 549.2007
Unmitigated 0.1372 0.8389 1.5198

4.1700e0030.6015 0.1602 3.8900e0030.1641 0.0000
Category tons/yr MT/yr
Mitigated 0.1315 0.8003 1.3874 5.9200e0030.5973
Fugitive Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total

4.0 Operational Detail - Mobile

4.1 Mitigation Measures Mobile
Increase Transit Accessibility
Improve Pedestrian Network
ROG NOx CO SO2

11.80 2.92 11.59 11.80 2.78 11.08 2.54 8.42 8.30 4.08 11.62 8.17 NBio-CO2 Total
CO2
CH4 N20 CO2e
Percent
Reduction

0.76 4.08 6.00 9.75
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
ROG NOx CO SO2 Fugitive Bio- CO2
PM10

15.7503 721.1661 736.9163 1.0355 7.7600e003Total 0.7514 0.9055 2.0743 6.5700e- 0.5973 0.0157 0.6129 0.1602 0.0154 0.1755 765.1158 003

1.6444 3.5557 5.2001 0.1694 4.0900e003Water 0.0000 0.0000 0.0000 0.0000 10.6543 Waste 0.0000 0.0000 0.0000 0.0000 14.1058 0.0000 14.1058 0.8336 0.0000 34.9466

0.5973 4.1700e- 0.0000 548.6616 548.6616 0.0216 0.0000 549.2007 003

0.6015 0.1602 3.8900e003Mobile 0.1315 0.8003 1.3874 5.9200e- 0.1641 003

0.0000 157.0326 157.0326 9.6600e0033.4700e0037.1400e- 158.3081 003

7.1400e0037.1400e0037.1400e003Energy 0.0103 0.0883 0.0376 5.6000e004

0.0000 11.9162 11.9162 1.2200e0032.0000e0044.3400e- 12.0060 003

4.3400e0034.3400e0034.3400e003Area 0.6096 0.0168 0.6494 9.0000e005 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Operational
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10

Page 2062 of 4069 ends

Agenda Item #6.4.

Page 6 of 13 ends

Hunter Subdivision Project Operations - Napa County, Annual Single Family Housing 0.621482 0.031755 0.164303 0.096476 0.014320 0.004717 0.015934 0.038849 0.003869 0.001558 0.005029 0.001019 0.000688

0.038849 0.003869 0.001558 0.005029 0.001019 0.000688

0.001019 0.000688
Condo/Townhouse 0.621482 0.031755 0.164303 0.096476 0.014320 0.004717 0.015934 City Park 0.621482 0.031755 0.164303 0.096476 0.014320 0.004717 0.015934 0.038849 0.003869 0.001558 0.005029

0.038849 0.003869 0.001558 0.005029 0.001019 0.000688

SBUS MH
Apartments Low Rise 0.621482 0.031755 0.164303 0.096476 0.014320 0.004717 0.015934 Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY

15.00 54.00 86 11 3

4.4 Fleet Mix

15.00 54.00 86 11 3
Single Family Housing 10.80 4.80 5.70 31.00

48.00 19.00 66 28 6
Condo/Townhouse 10.80 4.80 5.70 31.00

15.00 54.00 86 11 3
City Park 9.50 7.30 7.30 33.00
H-S or C-C H-O or C-NW Primary Diverted Pass-by
Apartments Low Rise 10.80 4.80 5.70 31.00

4.3 Trip Type Information
Miles Trip % Trip Purpose %
Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or CW
Total 798.40 816.54 707.90 1,820,116 1,605,342
Single Family Housing 481.44 487.56 423.81 1,094,942 965,739 Condo/Townhouse 236.00 239.00 207.75 536,736 473,401
City Park 0.00 0.00 0.00
Apartments Low Rise 80.96 89.98 76.34 188,438 166,202
Land Use Weekday Saturday Sunday Annual VMT Annual VMT

4.2 Trip Summary Information
Average Daily Trip Rate Unmitigated Mitigated

Page 2063 of 4069 ends

Agenda Item #6.4.

Page 7 of 13 ends

Hunter Subdivision Project Operations - Napa County, Annual

7.1400e- 102.9182
003

0.0000 102.3102 102.3102 1.9600e0031.8700e0035.6000e0047.1400e0037.1400e0037.1400e003

72.7558 1.3900e0031.3300e00373.1882
Total 0.0103 0.0883 0.0376

5.0800e0035.0800e0035.0800e0030.0000 72.7558

24.0821
Single Family
Housing

1.36339e+
006

7.3500e0030.0628 0.0267 4.0000e0045.0800e003

1.6700e0030.0000 23.9398 23.9398 4.6000e0044.4000e0041.3000e0041.6700e0031.6700e0031.6700e003

0.0000 0.0000 0.0000 0.0000
Condo/Townhous
e
448615 2.4200e0030.0207 8.8000e003

0.0000 0.0000 0.0000 0.0000 0.0000

5.6480
City Park 0 0.0000 0.0000 0.0000 0.0000 0.0000

3.9000e0040.0000 5.6146 5.6146 1.1000e0041.0000e0043.0000e0053.9000e0043.9000e0043.9000e004Apartments Low Rise
105214 5.7000e0044.8500e0032.0600e003
NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr tons/yr MT/yr
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2

5.2 Energy by Land Use - NaturalGas
Unmitigated
NaturalGa
s Use
ROG NOx CO SO2 Fugitive
PM10

0.0000 102.3102 102.3102 1.9600e0031.8800e0037.1400e- 102.9182 003

7.1400e0037.1400e0037.1400e003NaturalGas
Unmitigated

0.0103 0.0883 0.0376 5.6000e004

0.0000 102.3102 102.3102 1.9600e0031.8800e0037.1400e- 102.9182 003

7.1400e0037.1400e0037.1400e003NaturalGas
Mitigated

0.0103 0.0883 0.0376 5.6000e004

0.0000 54.7224 54.7224 7.7000e0031.5900e003Electricity 0.0000 0.0000 0.0000 0.0000 55.3899 Unmitigated

0.0000 54.7224 54.7224 7.7000e0031.5900e0030.0000 0.0000 0.0000 0.0000 55.3899 CO2e
Category tons/yr MT/yr
Electricity
Mitigated
PM2.5
Total
SO2 Fugitive Bio- CO2 NBio- CO2 Total CO2 CH4 N2O
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5

5.0 Energy Detail
Historical Energy Use: N

5.1 Mitigation Measures Energy
ROG NOx CO

Page 2064 of 4069 ends

Agenda Item #6.4.

Page 8 of 13 ends

Hunter Subdivision Project Operations - Napa County, Annual Total 54.7223 7.7100e- 55.3899
003

1.5900e003

11.9181
Single Family
Housing
411955 38.4930 5.4200e0031.1200e00338.9626
Condo/Townhous
e
126011 11.7745 1.6600e0033.4000e004

4.5092
City Park 0 0.0000 0.0000 0.0000 0.0000
Land Use kWh/yr t
o
n
MT/yr
Apartments Low
Rise
47675.9 4.4548 6.3000e0041.3000e004
102.9182

5.3 Energy by Land Use - Electricity
Unmitigated
Electricity
Use
Total CO2 CH4 N2O CO2e

7.1400e0030.0000 102.3102 102.3102 1.9600e0031.8700e0035.6000e0047.1400e0037.1400e0037.1400e003

72.7558 1.3900e0031.3300e00373.1882
Total 0.0103 0.0883 0.0376

5.0800e0035.0800e0035.0800e0030.0000 72.7558

24.0821
Single Family
Housing

1.36339e+
006

7.3500e0030.0628 0.0267 4.0000e0045.0800e003

1.6700e0030.0000 23.9398 23.9398 4.6000e0044.4000e0041.3000e0041.6700e0031.6700e0031.6700e003

0.0000 0.0000 0.0000 0.0000
Condo/Townhous
e
448615 2.4200e0030.0207 8.8000e003

0.0000 0.0000 0.0000 0.0000 0.0000

5.6480
City Park 0 0.0000 0.0000 0.0000 0.0000 0.0000

3.9000e0040.0000 5.6146 5.6146 1.1000e0041.0000e0043.0000e0053.9000e0043.9000e0043.9000e004 Land Use kBTU/yr tons/yr MT/yr
Apartments Low
Rise
105214 5.7000e0044.8500e0032.0600e003
Fugitive Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Mitigated
NaturalGa
s Use
ROG NOx CO SO2

Page 2065 of 4069 ends
← All documents from this meeting