Cities Index.
Agenda packet, regular meeting

St. Helena City Council
April 28, 2026

Document
Agenda packet, regular meeting
Meeting
April 28, 2026
Body
St. Helena City Council
Pages
72
Original file
7.4 MB
Text extracted from the city's file for reading and search. Open the original on sthelenaca.api.civicclerk.com. That file is the official record.

City of St. Helena
City Council Regular Meeting
Tuesday, April 28, 2026 @ 6:00 PM
Vintage Hall Board Room - Second Floor
465 Main Street, St. Helena CA
REMOTE PARTICIPATION:

Sheraton Grand Sacramento Hotel
1230 J St., Sacramento, CA 95814
PLEASE NOTE: Any person who wishes to speak regarding an item on the agenda or make a comment under the "Public Forum" portion of the agenda may do so, but please observe the time limit of four minutes.

The City Council meeting will be live-streamed on Comcast Channel 28 and on the City’s website.

Public comment for City Council meetings will be accepted via email via to [email protected]. All public comments must be received three hours prior to the meeting. All other public comments received after the deadline will be attached to the item the next business day or soon thereafter. Public comments will not be read out loud but will be publicly available and attached to the online City Council agenda.

To ensure interpreters are available, requests must be made at least 72 hours in advance by calling the Office of the City Clerk at (707) 968-2640 or emailing [email protected].

The schedule of upcoming meetings and published meeting agendas can be found on the City of St. Helena website at cityofsthelena.gov.

Servicios de interpretación en español durante la reunión pueden ser solicitados por el público.

Para asegurar que los intérpretes estén disponibles, los servicios tienen que ser solicitados al menos 72 horas antes de la reunión llamando a la oficina de la Secretaria de la Ciudad al (707) 968-2640 o por correo electrónico a [email protected].

El horario de las reuniones publicadas y próximas puede ser localizado en el sitio de web de la Ciudad en cityofsthelena.gov

1. CALL TO ORDER

2. ROLL CALL
Mayor: Paul Dohring, Vice Mayor: Michelle Deasy, City Council Members: Aaron Barak, Kate Spadarotto, Billy Summers

3. PLEDGE OF ALLEGIANCE

4. ADOPTION OF THE AGENDA

5. APPROVAL OF THE MINUTES

5.1. Regular City Council Meeting Minutes of April 14, 2026

Page 1 of 72 ends

6. PUBLIC FORUM
Members of the public are entitled to speak on matters of municipal concern not on the agenda during Public Forum. Each person’s comments shall be limited to 4 minutes. Each person is entitled to speak on any non-agendized item only once at any meeting. Brief questions by Council Members for clarifications may be posed and answered, and Council Members may make requests that items be placed on future agendas, but in accordance with state law, no substantive discussion or action may take place unless and until the matter properly appears on the agenda.

6.1. Public Comment

7. REPORTS BY STAFF AND CITY COUNCIL, FUTURE AGENDA ITEMS, AND AB 1234 REPORTS
Reports by staff and/or Council Members on items of general interest. Brief questions for clarification may be posed and answered, and Council Members may request that items be placed on a future agenda. Except under certain circumstances, the Brown Act prohibits any other discussion or action by the City Council.

8. PRESENTATIONS AND PUBLIC RECOGNITIONS

9. STAFF BRIEFING AND PRESENTATIONS

10. CONSENT ITEMS
Members of the Council or the public (present at the meeting) may ask that any items be considered individually for purposes of considering alternative action, for extended discussion, or for public comment. Unless that is done, one motion may be used to adopt all recommended actions. (Roll Call Vote) Estimated start time: 6:15 p.m.

10.1.Consideration and approval of a resolution authorizing a temporary closure of a portion of Hunt Avenue on Saturday, June 20, 2026, from 6:00a.m. to 8:00p.m., for a Pride Celebration event; and (2) authorizing mobile vendors to park and operate on the closed portion of Hunt Avenue during the event; and (3) a permit allowing the possession of open alcoholic beverages on the closed portion of Hunt Avenue for the event.

CEQA Determination: Not a CEQA Project (CEQA Guidelines §15378) Prepared By: Rebecca White, Administrative Assistant
Recommendation: Staff recommends approval of the attached resolution.

10.2.Consideration and approval of a resolution authorizing a temporary closure of Adams Street and Library Lane on Sunday, June 21, 2026, from 6:00a.m. to 6:00p.m.; and (2) mobile vendors to park and operate on Library Lane during the car show event; and (3) a permit allowing the possession of open alcoholic beverages on the closed portions of Adams Street and Library Lane for the Rianda House Car Show event.

CEQA Determination: Not a CEQA Project (CEQA Guidelines §15378) Prepared By: Rebecca White, Administrative Assistant
Recommendation: Staff recommends approval of the attached resolution.

Page 2 of 72 ends

10.3.March 2026 Review and Forecasting of City Water Supply Availability CEQA Determination: Not a CEQA Project (CEQA Guidelines §15378) Prepared By: Rebecca White, Administrative Assistant
Recommendation: Receive and file.

10.4.Consideration and approval of a Public Utility Easement Deed between the City of St. Helena and PG&E and authorization to record the Easement Deed with the County of Napa.

CEQA Determination: Not a CEQA Project (CEQA Guidelines §15378) Prepared By: Eric Janzen, Asst. PW Director
Recommendation: Staff recommends City Council approve the attached Resolution and approve the Public Utility Easement Deed between PG&E and the City of St. Helena.

11. PUBLIC HEARINGS

12. OLD BUSINESS

13. NEW BUSINESS
Estimated start time: 6:30 p.m.

13.1.Water Treatment Plant Condition Assessment Report Acceptance CEQA Determination: Not a CEQA Project (CEQA Guidelines §15378) Prepared By: Bruce Zaeni, Project Manager
Recommendation: Receive and file the report.

14. CITY COUNCIL REPORTS

15. ADJOURNMENT
The next Regular City Council meeting is scheduled for May 12, 2026.

This agenda was posted at City Hall, 1088 College Avenue, and at Vintage Hall, 465 Main Street, St. Helena, California on April 24, 2026.

Andrew Bradley, City Clerk
In Compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please call the City Clerk’s Office (707) 967-2792. Notification 72 hours prior to the meeting as required by Section 202 of the Americans with Disabilities Act will enable the City to make reasonable arrangements to ensure accessibility to this meeting.

CHALLENGING DECISIONS OF CITY ENTITIES
The time limit within which to commence any lawsuit or legal challenge to any quasi-adjudicative decision made by the City of St. Helena is governed by Section 1094.6 of the Code of Civil Procedure, unless a shorter limitation period is specified by any other provision, including without limitation Government Code section 65009 applicable to many land use and zoning decisions, Government Code section 66499.37 applicable to the Subdivision Map Act, and Public Resources Code section 21167 applicable to the California Environmental Quality Act (CEQA).

Under Section 1094.6, any lawsuit or legal challenge to any quasi-adjudicative decision made by the City must be filed no later than the 90th day following the date on which such decision becomes final. Any lawsuit or legal challenge, which is not filed within that 90-day period, will be

Page 3 of 72 ends

barred. Government Code section 65009 and 66499.37, and Public Resources Code section 21167, impose shorter limitations periods and requirements, including timely service in addition to filing.

If a person wishes to challenge the above actions in court, they may be limited to raising only those issues they or someone else raised at the meeting described in this notice, or in written correspondence delivered to the City of St. Helena, at or prior to the meeting. In addition, judicial challenge may be limited or barred where the interested party has not sought and exhausted all available administrative remedies.

SUPPLEMENTAL MATERIAL RECEIVED AFTER THE POSTING OF THE AGENDA Any supplemental writings or documents distributed to a majority of the City Council regarding any item on this Agenda, after the posting of the Agenda, will be available for public review in the City Clerk’s Office located at 1088 College Avenue, St. Helena, California, during normal business hours and by appointment. In addition, such writings or documents will be made available on the City’s website at cityofsthelena.gov and will be available for public review at the respective meeting.

Page 4 of 72 ends

MINUTES
City of St. Helena
Regular City Council Meeting
Tuesday, April 14, 2026 @ 6:00 PM
Vintage Hall Board Room - Second Floor
465 Main Street, St. Helena CA
A complete video recording of this meeting, except for closed session, can be found at cityofsthelena.gov or by calling the City Clerk at (707) 968-2742. The City Council video is the official record of the Council meeting.

Present: Mayor Paul Dohring, Vice Mayor Michelle Deasy, City Council Member Aaron Barak, City Council Member Kate Spadarotto

Absent: City Council Member Billy Summers

1. CALL TO ORDER
Mayor Dohring called the meeting to order at 6:01 p.m.

2. ROLL CALL
Mayor: Paul Dohring, Vice Mayor Michelle Deasy, City Council Members: Aaron Barak, Kate Spadarotto, Billy Summers

3. PLEDGE OF ALLEGIANCE
Mayor Dohring invited Police Chief Chris Hartley to lead the Pledge of Allegiance.

4. ADOPTION OF THE AGENDA
City Clerk, Andrew Bradley noted that staff was removing item 10.1. The item will be placed on a future agenda.

City Council Member Aaron Barak moved to adopt the amended agenda. The motion was seconded by City Council Member Kate Spadarotto and on voice vote carried by the following vote:

AYES: Mayor Paul Dohring, Vice Mayor Michelle Deasy, City Council Member Aaron Barak, City Council Member Kate Spadarotto
NOES: None
ABSENT: City Council Member Billy Summers
ABSTAIN: None
RECUSE: None

Page 5 of 72 ends

5. APPROVAL OF THE MINUTES
City Council Member Aaron Barak moved to approve the Regular City Council Meeting minutes of March 24, 2026 and the Special City Council Meeting minutes of April 7, 2026. The motion was seconded by City Council Member Kate Spadarotto and on voice vote carried by the following vote:

AYES: Mayor Paul Dohring, Vice Mayor Michelle Deasy, City Council Member Aaron Barak, City Council Member Kate Spadarotto
NOES: None
ABSENT: City Council Member Billy Summers
ABSTAIN: None
RECUSE: None

5.1. Regular City Council Meeting Minutes of March 24, 2026

5.2. Special City Council Meeting Minutes of April 7, 2026

6. PUBLIC FORUM
Members of the public are entitled to speak on matters of municipal concern not on the agenda during Public Forum. Each person’s comments shall be limited to 4 minutes. Each person is entitled to speak on any non-agendized item only once at any meeting. Brief questions by Council Members for clarifications may be posed and answered, and Council Members may make requests that items be placed on future agendas, but in accordance with state law, no substantive discussion or action may take place unless and until the matter properly appears on the agenda.

6.1. Public Comment
Lynn Perez addressed the Council.

Page 6 of 72 ends

7. REPORTS BY STAFF AND CITY COUNCIL, FUTURE AGENDA ITEMS, AND AB 1234 REPORTS
Reports by staff and/or Council Members on items of general interest. Brief questions for clarification may be posed and answered, and Council Members may request that items be placed on a future agenda. Except under certain circumstances, the Brown Act prohibits any other discussion or action by the City Council.

Reports were provided by Acting City Manager Joe Leach, Community Development Director Leza Mikhail, Community Services Director Ashley Sylvester and Fire Chief John Sorensen.

City Attorney Ethan Walsh, reported on the Closed Session of March 24, 2026.Regarding the litigation filed against the City by Reed Woodson, the City Council unanimously directed the City Attorney to defend the lawsuit. There was no reportable action on the City Manager performance review. There was no reportable action from the Special Closed Session meetings of April 7 and April 14, 2026.

8. PRESENTATIONS AND PUBLIC RECOGNITIONS
Estimated start time: 6:45 p.m.

8.1. Proclaiming April as Sexual Assault Awareness Month (SAAM) Mayor Dohring presented the proclamation to Araceli Martinez and Alma Garcia of NEWS Domestic Violence and Sexual Abuse Services.

8.2. National Library Week Proclamation
Mayor Dohring presented the proclamation to Deborah Claymon Boeschen, Chair of the City of St. Helena Library Board of Trustees.

8.3. Arbor Day Proclamation
Mayor Dohring presented the proclamation to Carlos Uribe, Public Works Assistant Operations Manager.

8.4. Presentation of U.S. Congressional Record Recognition Honoring Retirement of Police Chief Chris Hartley from Congressman Mike Thompson by Anna Chouteau, Field Representative.

Field Representative, Anna Chouteau, representing Congressman Mike Thompson's office, presented Police Chief Chris Hartley with the U.S.

Congressional Record.

Page 7 of 72 ends

8.5. Presentation of a California State Senate Resolution, authored by Senator Christopher Cabaldon, District 3 and co-signed by California Assembly Majority Leader Cecilia Aguiar-Curry, District 4, recognizing the Retirement of Police Chief Chris Hartley by Alex Pader District Director for Senator Cabaldon.

Alex Pader, District Director for Senator Christopher Cabaldon's office, presented Police Chief Chris Hartley with a California State Senate resolution authored by Senator Cabaldon and co-signed by California Assembly Majority Leader Cecilia Aguiar-Curry.

8.6. Celebrating the Retirement of Chief of Police Chris Hartley Mayor Dohring presented Chief Hartley with retirement gift on behalf of the City. At 6:37 p.m. Mayor Dohring called for a 15-minute recess to recognize Chief Hartley’s retirement with refreshments.

9. STAFF BRIEFING AND PRESENTATIONS

10. CONSENT ITEMS
Members of the Council or the public (present at the meeting) may ask that any items be considered individually for purposes of considering alternative action, for extended discussion, or for public comment. Unless that is done, one motion may be used to adopt all recommended actions. (Roll Call Vote) Estimated start time: 7:15 p.m.

10.1.This item was removed from the agenda and will be moved to a date uncertain.

Consideration and acceptance of a Public Utility Easement Deed between the City of St. Helena and PG&E and authorization to record the Easement Deed with the County of Napa.

CEQA Determination: Not a CEQA Project (CEQA Guidelines §15378) Prepared By: Eric Janzen, Asst. PW Director
Recommendation: Staff recommends City Council approve the attached Resolution and approve the Public Utility Easement Deed between PG&E and the City of St. Helena.

Page 8 of 72 ends

10.2.This item was pulled for discussion.

Consideration and Proposed Approval of a Resolution (1) Authorizing the City Manager to execute a Professional Services Agreement with Cannon Corporation for SCADA System Assessment and Preliminary Design for Project CIP No. W18-113 in an Amount not-to-exceed $109,718; and (2) Authorizing the Director of Public Works to approve Change Orders not-toexceed 10% of the contract price; and (3) Authorize the Recommended Budget Amendments/Transfers.

CEQA Determination: Not a CEQA Project (CEQA Guidelines §15378) Prepared By: Bruce Zaeni, Project Manager
Recommendation: Staff recommends approval of the attached Resolution.

Mayor Dohring opened public comment. Garry Rose addressed the Council.

The discussion was turned back over to the Council, where questions were asked to staff.

City Council Member Kate Spadarotto moved to approve the resolution. The motion was seconded by Vice Mayor Michelle Deasy and on roll call carried by the following vote:

AYES: Mayor Paul Dohring, Vice Mayor Michelle Deasy, City Council Member Aaron Barak, City Council Member Kate Spadarotto
NOES: None
ABSENT: City Council Member Billy Summers
ABSTAIN: None
RECUSE: None

11. PUBLIC HEARINGS
None.

12. OLD BUSINESS
None.

13. NEW BUSINESS
Estimated start time: 7:30 p.m.

13.1.Approval of a Resolution awarding nonprofit grant funding through the Nonprofit Grant Program in Fiscal Year (FY) 2026-27 Operations Budget in the amount of $75,000.

CEQA Determination: Not a CEQA Project (CEQA Guidelines §15378) Prepared By: Ciara Caouette, Senior Accounting Tech
Recommendation: Staff recommends approval of the attached resolution.

Page 9 of 72 ends

Administrative Services Director Mandy Kellogg presented the item.

Mayor Dohring called for clarifying questions from the Council.

Mayor Dohring opened up the public comment; Justin Ammon and Kristina Skinner addressed the Council
Prior to the motion, Mayor Dohring recused himself from voting on the Nimbus Arts portion of the grant award due to a conflict of interest. City Attorney Ethan Walsh advised that separate motions were permissible.

Vice Mayor Michelle Deasy moved to approve the resolution excluding the Nimbus Arts grant. The motion was seconded by City Council Member Aaron Barak and on roll call carried by the following vote:

AYES: Mayor Paul Dohring, Vice Mayor Michelle Deasy, City Council Member Aaron Barak, City Council Member Kate Spadarotto
NOES: None
ABSENT: City Council Member Billy Summers
ABSTAIN: None
RECUSE: None
Council Member Kate Spadarotto moved to approve the resolution for the Nimbus Arts grant. The motion was seconded by City Council Member Aaron Barak and on roll call carried by the following vote:

AYES: Vice Mayor Michelle Deasy, City Council Member Aaron Barak, City Council Member Kate Spadarotto
NOES: None
ABSENT: City Council Member Billy Summers
ABSTAIN: Mayor Paul Dohring
RECUSE: None

13.2.Consideration and Approval of a Resolution (1) Approving the purchase of a Clayton Homes manufactured home for the Water Treatment Plant; (2) Authorizing the City Manager to negotiate and execute a purchase agreement with Clayton Homes; (3) Declaring the existing manufactured home surplus and authorizing staff to dispose; (4) Authorizing a budget increase of $240,671 for CIP Project W26-03 Water Treatment Plant Modular Housing; (5) Authorizing associated budget adjustments; (6) Authorizing the Director of Public Works to approve construction change orders not to exceed 10%.

CEQA Determination: Not a CEQA Project (CEQA Guidelines §15378) Prepared By: Mario Traverso, Project Manager
Recommendation: Consider and Approve the Resolution

Page 10 of 72 ends

Mario Traverso, Project Manager, presented the item.

Mayor Dohring called for clarifying questions from the Council.

Mayor Dohring opened the public comment; no comments were received.

The matter was then returned to the Council where questions and comments were made.

City Council Member Aaron Barak moved to adopt the staff recommendation.

The motion was seconded by Vice Mayor Michelle Deasy and on roll call carried by the following vote:

AYES: Mayor Paul Dohring, Vice Mayor Michelle Deasy, City Council Member Aaron Barak, City Council Member Kate Spadarotto
NOES: None
ABSENT: City Council Member Billy Summers
ABSTAIN: None
RECUSE: None

13.3.Approval of a Resolution Authorizing Recruitment for a City Manager and Provide Direction Regarding the Selection of a Firm to Conduct the Recruitment Process.

CEQA Determination: Not a CEQA Project (CEQA Guidelines §15378) Prepared By: Mandy Kellogg, Director of Administrative Services Recommendation: Staff recommends that City Council approve the attached resolution and provide direction and authorization to retain a firm to assist in the recruitment process.

Page 11 of 72 ends

Administrative Services Director Mandy Kellogg presented the item.

Mayor Dohring called for clarifying questions from the Council.

Mayor Dohring opened the public comment; no comments were received.

The Council then deliberated on the item
Mayor Paul Dohring moved to approve the staff recommended resolution that that addresses the recruitment component and to appoint Vice Mayor Deasy and Council Member Barak to a subcommittee to review recruitment firms and return to Council for approval. The motion was seconded by City Council Member Kate Spadarotto and on roll call carried by the following vote:

AYES: Mayor Paul Dohring, Vice Mayor Michelle Deasy, City Council Member Aaron Barak, City Council Member Kate Spadarotto
NOES: None
ABSENT: City Council Member Billy Summers
ABSTAIN: None
RECUSE: None

13.4.Approval of a Resolution 1. Appointing James McCann as Interim City Manager pursuant to Government Code section 21221(h), effective April 14, 2026; and 2. Approving an Interim Employment Agreement with James McCann for service as Interim City Manager.

CEQA Determination: Not a CEQA Project (CEQA Guidelines §15378) Prepared By: Mandy Kellogg, Director of Administrative Services Recommendation: Staff recommends approval of the attached resolution.

Page 12 of 72 ends

Administrative Services Director Mandy Kellogg reported on the item.

Council Members asked brief clarifying questions.

City Attorney Ethan Walsh disclosed the terms of the contract.

Mayor Dohring opened the public comment; James McCann addressed the Council.

City Council Member Aaron Barak moved to approve the resolution. The motion was seconded by Vice Mayor Michelle Deasy and on roll call carried by the following vote:

AYES: Mayor Paul Dohring, Vice Mayor Michelle Deasy, City Council Member Aaron Barak, City Council Member Kate Spadarotto
NOES: None
ABSENT: City Council Member Billy Summers
ABSTAIN: None
RECUSE: None

13.5.Approval of a Resolution Authorizing a Budget Increase in the Amount of $457,287 Utilizing General Fund Reserves to Cover Expenses Related to the City Manager Separation Agreement.

CEQA Determination: Not a CEQA Project (CEQA Guidelines §15378) Prepared By: Mandy Kellogg, Director of Administrative Services Recommendation: Staff recommends approval of the attached resolution.

Administrative Services Director, Mandy Kellogg reported on the item. City Attorney Ethan Walsh provided a brief explanation of what may and may not be discussed publicly regarding the item.

Mayor Dohring opened the public comment; no comments were received.

Vice Mayor Michelle Deasy moved to approve the resolution. The motion was seconded by City Council Member Kate Spadarotto and on roll call carried by the following vote:

AYES: Mayor Paul Dohring, Vice Mayor Michelle Deasy, City Council Member Aaron Barak, City Council Member Kate Spadarotto
NOES: None
ABSENT: City Council Member Billy Summers
ABSTAIN: None
RECUSE: None

Page 13 of 72 ends

14. CITY COUNCIL REPORTS
Vice Mayor Deasy reported on the Climate Action Committee. Mayor Dohring reported briefly on the LAFCO committee.

15. ADJOURNMENT
The next Regular City Council meeting is scheduled for April 28, 2026.

Mayor Dohring adjourned the meeting at 8:02 p.m.

Page 14 of 72 ends

Agendas Report to the City Council
Agenda Section: PUBLIC FORUM
Department: Admin
DATE: April 28, 2026
FROM:

SUBJECT: Public Comment
ATTACHMENTS:

1. Public Comment - Michelle Covell

Page 15 of 72 ends








 











! "#$%&&
'(&
)*#$%&&+$(&,-$%#&$./$*0 1
2&3
456656768
9:;8
<"
= "#$%&&
'(&
)*#$%&&+$(&,-$%#&$./$*0 >?@ABC

DEFFGHI
J
KEL
>?@ABC
MEL?F
J
HGNI
DBIO
DE?HCBA

FGGPHQR
STBU
BU
FG

UVGWXBHQ
WU
W

LGUBYGHIZ

LGWYBHQ
ITG
>AWHHBHQ
DEFFBUUBEHGL[U
\WHY@EEXR

]
KE?HY
ITBU
UGCPEH
?HYGL
^GGPHQU
WHY
>LECGY?LGUR

]
ITE?QTI
BI
FBQTI
@G
QEEY
IE
UTWLGZ
WU
BI
TWY
CEFG
?VZ
]
@GABG_GZ
BH
V?@ABC
KEL?F
BH
W
CBIO
CE?HCBA
WHY

VAWHHBHQ

CEFFBUUBEH

FGGPHQR

`abcde
fghcdi
STG
jLEkH
lCI
HEk
TWU

UVGCBWA
L?AGU
ITWI
WVVAO
IE
UECBWA
FGYBW
CEFF?HBCWPEHUmnR

>?@ABC
EoCBWAU
FWO
CEFF?HBCWIG
EH
UECBWA
VAWpELFU
IE
WHUkGL
q?GUPEHU
WHY
VLE_BYG
ITG
V?@ABC
kBIT

BHKELFWPEHR
STGO
FWO
WAUE

UEABCBI

BHKELFWPEH

LGQWLYBHQ
FWrGLU
@GBHQ

CEHUBYGLGY
@O
ITG
@EYOZ
EL
ITWI
KWAA
kBITBH
ITG
EoCBWAsU
t?LBUYBCPEHR
\EkG_GLZ
ITG
jLEkH
lCI
HEk
VLETB@BIU
V?@ABC
EoCBWAU
KLEF

LGUVEHYBHQ

YBLGCIAO
IE
WHO
CEFF?HBCWPEHU
VEUIGY
EH
ITG

BHIGLHGI
@O
WHO
EITGL
FGF@GLU
EK
ITG
UWFG
AGQBUAWP_G
@EYO

LGQWLYBHQ
W
FWrGL
kBITBH
ITG
t?LBUYBCPEH
EK
ITG
AGQBUAWP_G
@EYOR
uBLGCI

LGUVEHUGU
WAUE
BHCA?YG
ITG
?UG
EK
GFEtBU
WHY
vABXGw
@?rEHUR
]FVELIWHIAOZ
ITBU

WVVABGU
IE
WHO
IkE
FGF@GLU
x
ITG
FWtELBIO
BU
HEI
LGq?BLGY
KEL
W
_BEAWPEH
IE
ECC?LR
]H

VLWCPCGZ
W_EBY

LGUVEHYBHQ
IE
KGAAEk
FGF@GLUs
VEUIU
WI
WAA
WHY

CEHUBYGL
HEI
KEAAEkBHQ
GWCT
EITGL
EH
UECBWA
FGYBWR

Page 16 of 72 ends

Agendas Report to the City Council
Agenda Section: CONSENT ITEMS
Department: Public Works Department
DATE: April 28, 2026
FROM: Rebecca White, Administrative Assistant
SUBJECT: Consideration and approval of a resolution authorizing a temporary closure of a portion of Hunt Avenue on Saturday, June 20, 2026, from 6:00a.m. to 8:00p.m., for a Pride
Celebration event; and (2) authorizing mobile vendors to park and operate on the closed portion of Hunt Avenue
during the event; and (3) a permit allowing the possession of open alcoholic beverages on the closed portion of Hunt Avenue for the event.

RECOMMENDED
ACTION:

Staff recommends approval of the attached resolution.

PREVIOUS COUNCIL
ACTION:

None.

STATEMENT OF THE
PURPOSE:

Authorize the road closure of Hunt Avenue, allow for mobile food vendors to park and operate on the closed portion of Hunt Avenue, and allow for the possession of open
alcoholic beverages on the closed portions of the streets for the 2026 Pride Celebration event.

FINANCIAL IMPACT: There currently is not a financial impact. However, should the applicant choose to seek and receive waived permit
fees for this event, the financial impact could be projected to be as much as $1,375 for required permits related to this event, including a minor encroachment permit, road closure permit, and raw water permit.

CEQA DETERMINATION: Not a CEQA Project (CEQA Guidelines §15378) BACKGROUND:

The Public Works Department has received applications for a minor encroachment permit and a road closure permit to temporarily close a portion of Hunt Avenue on June 20, 2026, for a Pride Celebration event. The applicants are requesting the temporary road closure to facilitate a centrally-located event in the heart of town, focused on creating a community-based and inclusive celebratory event for all ages.

Page 17 of 72 ends

DISCUSSION:

The proposed road closure will take place on Saturday, June 20, 2026, from 6:00a.m. to 8:00p.m., to allow for setup and tear down of the event, as well as the event itself. The event is still in the planning stages, hinging on the approval of City Council before more formal planning and commitments can take place. A letter from the applicant is attached, describing the vision for this event: a small festival with local food vendors, music, dancing, arts & crafts, and more, to bring pride celebreation to St. Helena. The Hunt Avenue location was chosen as it is central to downtown, benefiting both local residents and downtown business owners. While the applicant has not indicated that alcoholic beverages will be sold, the resolution includes language allowing for such activity to provide flexibility in the event planning. The applicant is responsible for securing any applicable ABC licenses should they wish to have vendors with alcoholic beverages at this event.

As stated above, this event is in the preliminary planning stages. While City Council approval authorizes the proposed road closure, the road closure and event may only proceed if the applicant obtains all required permits and complies with all applicable requirements. The applicant is responsible for securing all required permits prior to the start of the event. This includes a noise permit from the Police Department, if applicable, as well as all necessary Public Works permits such as a minor encroachment permit and road closure permit. Staff will work with the applicant to ensure all necessary submittals are received, and that all required City permits are issued prior to the event.

The approval process for the minor encroachment and road closure permits includes coordination between Public Works, Fire, and Police to ensure proper safety measures are in place. The applicant is responsible for acquiring any permits required by Caltrans.

The road closure will be secured with a barricade equivalent to k-rail that will prevent errant vehicles driving through the closed portion of Hunt Avenue. Per the conditions of the road closure permit, the applicant will be responsible for communicating and coordinating with all residences and businesses within a 1,000-foot radius of the road closure, and will coordinate to ensure alternate access for any commercial driveways that may be affected by the closure.

ENVIRONMENTAL REVIEW:

None.

GOAL:

Goal 5: Enhance Quality of Life
ATTACHMENTS:

1. Hunt Closure Applicant Letter

2. Resolution

Page 18 of 72 ends

4/16/26
Statement of Purpose re: Request the closing of Hunt June 20th Dear Mayor and Councilmembers,
My name is Wayne Armstrong and my partner Marcus, and I would like to close Hunt Avenue June 20th to bring pride celebrations to St.

Helena. There are pride events happening in Napa and Yountville and in the 31 years we have operated our businesses on Main Street there have never been any pride specific events held in St. Helena.

We are interested in creating a community-based inclusive celebratory event with activities that will be fun for all ages and have been heartened by the broad base community and business support we have received to the idea and interest in participating.

We imagine the event to feel like a small harvest festival with local food vendors, craft and art, music and dancing, activities such as face painting, a photo booth as well as representation by various LGBTQ groups.

Hunt Avenue provides a festive, cozy, centralized space that will benefit local residents, visitors and downtown business owners.

Thank you,
Wayne

Page 19 of 72 ends

CITY OF ST. HELENA
RESOLUTION NO. 2026-
CONSIDERATION OF A RESOLUTION APPROVING (1) A TEMPORARY CLOSURE OF A PORTION OF HUNT AVENUE ON SATURDAY, JUNE 20, 2026, FROM 6:00 A.M. TO 8:00 P.M., FOR A PRIDE CELEBRATION EVENT; AND (2) MOBILE FOOD VENDORS TO PARK AND OPERATE ON THE
CLOSED PORTION OF HUNT AVENUE DURING THE EVENT; AND (3) A

PERMIT AUTHORIZING THE POSSESSION OF OPEN ALCOHOLIC
BEVERAGES ON THE CLOSED PORTION OF HUNT AVENUE.

RECITALS
A. The Public Works Department has received applications for a minor encroachment and road closure permit to temporarily close a portion of Hunt Avenue on Saturday, June 20, 2026, from 6:00a.m. to 8:00p.m; and
B. Closure of the City street will provide space for event activities; and C. A request has been made by the applicants for mobile food vendors to park and operate on Hunt Avenue during the event; and D. St. Helena Municipal Code Section 9.04.010 authorizes the Council, by permit, to allow possession of open alcoholic beverages on public streets or any private or public off-street parking lot; and E. Section 21101(e) of the California Vehicle Code provides the local authorities may, by resolutions, temporarily close a portion of any street for celebrations, parades, local special events, and other purposes when, in the opinion of local authorities having jurisdiction or a public officer of employee that the local authority designated by resolution, the closing is necessary for the safety and protection of persons who are to use that portion of the street during the temporary closing; and
F. The applicant is responsible for obtaining all required permits from the City of St. Helena prior to the start of the event.

RESOLUTION
NOW, THEREFORE, the City Council of the City of St. Helena resolves as follows:

Page 20 of 72 ends

1. The City Council finds that the benefits derived from the temporary closing of Hunt Avenue for the 2026 Pride Celebration event outweigh the anticipated inconveniences to the neighborhood and citizens, and authorizes the closure of Hunt Avenue, east of Main Street and west of Railroad Avenue, on Saturday, June 20, 2026, from 6:00 a.m. to 8:00 p.m.

2. Mobile food vendors are permitted to park and operate on Hunt Avenue while the event takes place.

3. Temporarily closing a portion of the subject street is necessary for the safety and protection of persons who are to use that portion of the street during the temporary closing.

4. The possession of open containers of alcohol is permitted on public streets and parking lots encompassed by this event.

5. The applicant must obtain all required permits from the City of St.

Helena prior to the start of the event.

6. The City Manager is directed to provide reasonable levels of City staff support to accomplish the closure of streets and related activities.

Approved at a Regular Meeting if the St. Helena City Council on April 28, 2026, by the following vote:

Mayor Paul Dohring: _____
Vice Mayor Michele Deasy: _____
Council Member Billy Summers: _____
Council Member Aaron Barak: _____
Council Member Kate Spadarotto: _____
APPROVED: ATTEST:
______________________ _____________________
Paul Jamison Dohring, Mayor Andrew Bradley, City Clerk

Page 21 of 72 ends

Agendas Report to the City Council
Agenda Section: CONSENT ITEMS
Department: Public Works Department
DATE: April 28, 2026
FROM: Rebecca White, Administrative Assistant
SUBJECT: Consideration and approval of a resolution authorizing a temporary closure of Adams Street and Library Lane on
Sunday, June 21, 2026, from 6:00a.m. to 6:00p.m.; and (2) mobile vendors to park and operate on Library Lane during the car show event; and (3) a permit allowing the
possession of open alcoholic beverages on the closed
portions of Adams Street and Library Lane for the Rianda House Car Show event.

RECOMMENDED
ACTION:

Staff recommends approval of the attached resolution.

PREVIOUS COUNCIL
ACTION:

None.

STATEMENT OF THE
PURPOSE:

Authorize the road closure of Adams Street and Library
Lane, allow for mobile food vendors to park and operate on Library Lane, and allow for the possession of open
alcoholic beverages on the closed portions of the streets for the Rianda House Car Show.

FINANCIAL IMPACT: The financial impact is $1,625 resulting from the applicant submittal of a Request for Fee Waiver form for 6 permits related to this event including an encroachment permit, a banner permit, a road closure permit, and a raw water
permit.

CEQA DETERMINATION: Not a CEQA Project (CEQA Guidelines §15378) BACKGROUND:

The Riand House Car Show is presented by the Gunilda Rianda Senior Center Association ("Rianda House") for the purposes of raising awareness of the needs of older adults in the community and raising funds to support Rianda House's programs and services.

The event will require a temporary closure of Adams Street east of 1001 Adams Street

Page 22 of 72 ends

to the dead end, and Library Lane. The closure will occur from 6:00a.m. to 6:00p.m. on Sunday, June 21, 2026, with the event itself expected to take place from 10:00a.m. to 4:00p.m. The closure will allow for the event, which is planned to display 75+ classic cars and vintages trucks, as well as set-up and clean-up of the event. Additionally, it will allow for mobile food vendors to operate on Library Lane during the event.

DISCUSSION:

Rianda House is taking the lead on communicating and coordinating with all residences and businesses within a 1,000-foot radius of the road closure, per the conditions of the road closure form, and will coordinate to ensure alternate access for any commercial driveways affected by the closure.

There will be a barricade equivalent to k-rail that will prevent errant vehicles driving through the closed portions of Adams Street for the actual event. The entrance fee has not yet been determined. Rented restrooms and trash cans will be placed in the closed portions of the street, and mobile food vendors will operate on Library Lane, which may include vendors selling alcohol. Rianda House is responsible for coordinating with their vendors to secure the necessary ABC licensing for the sale of alcohol at this event.

Vehicles in the car show will be lined up along the closed portion of Adams Street.

Members of the Rianda House teams have secured sponsors from local businesses and are advertising the show.

The event organizers will continue to coordinate and update City Staff members form the Police and Public Works Departments, and will follow through with any additional requirements that staff may have for the actual event.

ENVIRONMENTAL REVIEW:

None.

GOAL:

Goal 4: Provide Effective Community Information & Opportunities for Engagement Goal 5: Enhance Quality of LifeGoal 5: Enhance Quality of Life ATTACHMENTS:

1. Resolution

Page 23 of 72 ends

CITY OF ST. HELENA
RESOLUTION NO. 2026-
CONSIDERATION OF A RESOLUTION APPROVING (1) A TEMPORARY

CLOSURE OF ADAMS STREETS AND LIBRARY LANE ON SUNDAY, JUNE 21, 2026, FROM 6:00 A.M. TO 6:00 P.M., FOR THE RIANDA HOUSE CAR SHOW; (2) MOBILE FOOD VENDORS TO PARK AND OPERATE ON
LIBRARY LANE DURING THE RIANDA HOUSE CAR SHOW EVENT; AND (3) A PERMIT AUTHORIZING THE POSSESSION OF OPEN ALCOHOLIC

BEVERAGES ON THE CLOSED PORTION OF ADAMS STREET AND
LIBRARY LANE.

RECITALS
A. Rianda House Senior Activity Center is planning the Rianda House Car Show to bring the community together for the purpose of raising awareness of the needs of older adults in the community and raising funds to support Rianda House’s programs and services; and B. The St. Helena Public Works Department has requested temporary closure of Adams Street, east of 1001 Adams Street to the dead end, and Library Lane for the event; and
C. Closure of the City streets in the area will provide space for event activities; and
D. A request has been made by Rianda House for mobile food vendors to park and operate on Library Lane during the event; and E. St. Helena Municipal Code Section 9.04.010 authorizes the Council, by permit, to allow possession of open alcoholic beverages on public streets or any private or public off-street parking lot; and F. Section 21101(e) of the California Vehicle Code provides the local authorities may, by resolutions, temporarily close a portion of any street for celebrations, parades, local special events, and other purposes when, in the opinion of local authorities having jurisdiction or a public officer of employee that the local authority designated by resolution, the closing is necessary for the safety and protection of persons who are to use that portion of the street during the temporary closing.

Page 24 of 72 ends

RESOLUTION
NOW, THEREFORE, the City Council of the City of St. Helena resolves as follows:

1. The City Council finds that the benefits derived from the temporary closing of the City streets for the Rianda House Car Show outweigh the anticipated inconveniences to the neighborhood and citizens, and authorize the closures of Adams Street, east of 1001 Adams Street to the dead end, and Library Lane on Sunday, June 21, 2026, from 6:00 a.m. to 6:00 p.m.

2. Mobile food vendors are permitted to park and operate on Library Lane while the event takes place.

3. Temporarily closing a portion of the subject street is necessary for the safety and protection of persons who are to use that portion of the street during the temporary closing.

4. The possession of open containers of alcohol is permitted on public streets and parking lots encompassed by this event.

5. The City Manager is directed to provide reasonable levels of City staff support to accomplish the closure of streets and related activities.

Approved at a Regular Meeting if the St. Helena City Council on April 28, 2026, by the following vote:

Mayor Paul Dohring: _____
Vice Mayor Michele Deasy: _____
Council Member Billy Summers: _____
Council Member Aaron Barak: _____
Council Member Kate Spadarotto: _____
APPROVED: ATTEST:
______________________ _____________________
Paul Jamison Dohring, Mayor Andrew Bradley, City Clerk

Page 25 of 72 ends

Agendas Report to the City Council
Agenda Section: CONSENT ITEMS
Department: Public Works Department
DATE: April 28, 2026
FROM: Rebecca White, Administrative Assistant
SUBJECT: March 2026 Review and Forecasting of City Water Supply Availability

RECOMMENDED
ACTION:

Receive and file.

PREVIOUS COUNCIL
ACTION:

Monthly receive and file reports to City Council.

STATEMENT OF THE
PURPOSE:

To provide monthly updates of the amount of water
produced at the Louis Stralla Water Treatment Plant and the Stonebridge Water Wells, and potable water delivered from the City of Napa.

FINANCIAL IMPACT: None.

CEQA DETERMINATION: Not a CEQA Project (CEQA Guidelines §15378) BACKGROUND:

The City of St. Helena publishes a monthly water report on the City website (https://www.cityofsthelena.gov/330/W). The report includes the amount of water produced at the Louis Stralla Water Treatment Plant and the Stonebridge Potable Water Wells, as well as potable water delivered from the City of Napa. In addition to presenting data on the amount of water delivered monthly, the report includes year-to-date information and prior year data. Water elevation and capacity at the Bell Canyon Reservoir is included, as well as information on rainfall and monthly weather temperatures.

DISCUSSION:

City staff has developed a forecasting tool to facilitate its ability to optimize water use and track water availability. Included as an attachment is the Monthly Water Report for March 2026. The water produced for March 2026 is up by 7% when compared to March 2025, and is down by 4% compared to the average of March 2018-2020. The chart below summarizes the water produced per source:

Page 26 of 72 ends

Source
Average
(2018-
2020)
(AcreFeet)
March
2025
(AcreFeet)
March
2026
(AcreFeet)
Bell Canyon 37 14.14 24.30
Stonebridge
Wells
7 23.92 12.30
Napa Water 48 44.95 52.10
Total 92 83.01 88.70
• Percent change from March 2025: +7%
• Percent change from average of March 2018-2020: -4%
Bell Canyon Reservoir
The City is not in water emergency conditions based upon Phase 1 Water Emergency measures being terminated by City Council through adoption of Resolution No. 2023-94 on July 25, 2023. Bell Canyon Reservoir has adequate water to support the City's needs through this calendar year. The storage in the Bell Canyon graph (Attachment 2) has been revised to include historic reservoir supply levels since July 2021. It also shows the water availability forecast through June 2027 based on the highest water usage during a non-drought year (FY 19/20) and 10 inches of rainfall (lowest recorded).

As of April 1, 2026, Bell Canyon Reservoir elevation was at 420.87 feet, representing approximately 2,298.03 acre-feet (AF) and 96.4% capacity. Bell Canyon spillway level is 422 feet, representing 2,383.69 AF in water supply volume. Below is a chart comparing Bell Canyon Elevation levels, water supply availability in acre feet, and percent capacity of the reservoir on April 1 in 2024, 2025, and 2026:

Year 2024 2025 2026
Bell Canyon
Elevation Level
422 ft 422.15 420.87
Acre-Feet 2,383,69 2,383.69 2,298.03
Percent
Capacity
100 100 96.4
As a follow-up to the May 24, 2022, City Council meeting, staff developed a graph (Attachment 3) highlighting the relationship between the reservoir elevation level and water supply availability in acre-feet. The graph shows the current status of the reservoir. Furthermore, the graph also displays the points where City Council decided to declare Phase I and Phase II Water Emergencies in 2020.

Page 27 of 72 ends

Continued Water Conservation
California experienced two consecutive dry years: 2020 and 2021. Due to the combination of warmer-than-average temperatures and minimal precipitation in the state, the Department of Water Resources (DWR) declared 2021 as the fourth-driest year on record statewide. The record-breaking dry period in January and February 2022, and the absence of significant rains in March 2022, required DWR to reduce anticipated deliveries from the State Water Project (SWP). However, the reduction at the time did not affect St. Helena as the City has multiple robust water sources not affected by the executive order. Water availability from the Bell Canyon reservoir is based on the City's State Water Rights permit and not the SWP. The City has not received any curtailment order from DWR nor does the City anticipate receiving one.

It should be noted that on July 25, 2023, the City Council adopted Resolution No. 2023- 94 to formally end the Phase I Water Emergency. The projected demand on the system versus the anticipated rainfall over the next year reflects an available supply in Bell Canyon of approximately 1,895 AF, significantly above the 1,481 AF standard for declaration of a Phase I Water Emergency. Staff will monitor statewide and local drought conditions, weather conditions, and provide updates on a monthly basis. The corresponding staff report provided a variety of data to reflect the disposition of the water supply at that time in relation to the Council-adopted Safe Yield Policy.

City of Napa Water Supply
Normal operations continue at Rutherford Pump Station and the City is taking delivery of the allotment purchased from the City of Napa. During the month of March 2026, Rutherford Pump Station produced an average of 0.54 MG/day of water, for a total of

52.10 acre-feet for the month.

ENVIRONMENTAL REVIEW:

NA
GOAL:

Goal 3: Pursue Water Security & Sustainable Management of Water Resources ATTACHMENTS:

1. MWR March 1-31 2026

2. Attachment 3 - Bell Canyon Resservoir Storage Phase I II

3. Attachment 2 - Bell Canyon Water Storage Forecast

4. Attachment 4 - Bell Canyon Historical Elevation Levels

5. Attachment 5 - Bell Canyon Reservoir Historical Storage Elevation

Page 28 of 72 ends

CITY OF ST. HELENA

MONTHLY WATER REPORT
CC: CC __X__ PC__X__ FILE _____
RECEIVED: _____ BY: __

LOUIS STRALLA

WATER PLANT
TK #1 & #2
ADJUST

24.30 7.92 -0.14

27.5% -0.5%

28.89 MG MG
n/a MG MG
n/a MG MG

0.93 MG MG
% %
240.09 AF 33.3% 241.75 AF 27.8%

78.21 MG 78.75 MG
337.27 AF 46.8% 373.75 AF 43.0%
109.86 MG 121.74 MG
142.88 AF 19.8% 253.85 AF 29.2%

46.54 MG 82.69 MG
TOTAL WATER PRODUCED 720.24 AF 100.0% 869.35 AF 100.0%

DELIVERY (ALL)

0.04 0.00
420.87 FT. FT.
-1.19 FT. FT.
2298.03 AF AF

96.4 % %

0.00 IN IN

49.34 IN IN
DISCLAIMER: The data presented in this report is approximate and for informational purposes only.

Updates will be provided if any errors are identified.

AVERAGE 64.05 62.2

REMARKS
City of Napa Water Delivery: RPS producing an average of 0.54 MG/day during March 2026.

THIS MONTH, THIS YEAR THIS MONTH, LAST YR.

DEGREES IN FAHRENHEIT 37.8-89.6 41-83.4

TEMPERATURES
MONTHLY RISE OR DROP 0.95
CAPACITY AT END OF PERIOD 2383.69
PERCENT OF FULL CAPACITY 100.0
RAINFALL IN THIS PERIOD 1.97
TOTAL RAINFALL SEASON TO DATE 48.18
ELEVATION BELL CANYON RESERVOIR 422.15
STONEBRIDGE APARTMENTS MG/Mar. 1 -31 0.00 MG/Mar. 1-31

WATER ELEVATION, CAPACITY & RAINFALL

THIS FISCAL YEAR LAST FISCAL YEAR
NAPA VALLEY COLLEGE MG/Mar. 1 -31 0.00 MG/Mar. 1-31

STONEBRIDGE POTABLE WELLS

SBW IRRIGATION WATER
THIS MONTH THIS MONTH, LAST YR.

THIS FISCAL YEAR LAST FISCAL YEAR

LOUIS STRALLA WATER PLANT

NAPA WATER
MINIMUM DAILY PRODUCED n/a
AVERAGE DAILY PRODUCED 0.87

WATER YEAR TOTALS

WATER PRODUCED DELIVERY (AGGREGATE)
TOTAL PRODUCED THIS PERIOD 27.04
MAXIMUM DAILY PRODUCED n/a

0.05 16.97
PERCENT 13.9% 59.0%
-0.44

March 1-31, 2026

STONEBRIDGE

POTABLE
WELLS
SBW

IRRIGATION
WATER

NAPA WATER

THIS YEAR LAST YEAR
AMOUNT PRODUCED in AF 12.30 0.16 52.10
AMOUNT PRODUCED in MG 4.01

Page 29 of 72 ends
Page 30 of 72 ends
Page 31 of 72 ends
Page 32 of 72 ends
Page 33 of 72 ends

Agendas Report to the City Council
Agenda Section: CONSENT ITEMS
Department: Public Works Department
DATE: April 28, 2026
FROM: Eric Janzen, Asst. PW Director
SUBJECT: Consideration and approval of a Public Utility Easement Deed between the City of St. Helena and PG&E and
authorization to record the Easement Deed with the County of Napa.

RECOMMENDED
ACTION:

Staff recommends City Council approve the attached
Resolution and approve the Public Utility Easement Deed between PG&E and the City of St. Helena.

PREVIOUS COUNCIL
ACTION:

None.

STATEMENT OF THE
PURPOSE:

Approve the Public Utility Easement Deed pursuant to
which the City of St. Helena grants a public utility easement to PG&E and authorize recording with the County of Napa Recorder's Office.

FINANCIAL IMPACT: None
CEQA DETERMINATION: Not a CEQA Project (CEQA Guidelines §15378) BACKGROUND:

PG&E wishes to relocate existing overhead electrical utilities underground. Some of these utilities cross land owned by the City of St. Helena. PG&E has requested easements from the City for these proposed underground utilities.

Existing overhead electrical infrastructure is located on the City owned parcels APN 021-420-005, APN 021-410-012 and APN 021-420-006, commonly known as the Louis Stralla Water Treatment Plant (WTP). PG&E wishes to relocate their existing overhead facilities underground. The underground facilities will closely parallel the existing overhead facilities and be of similar width and length. The underground easement will include a new transformer to be located near the existing WTP pump station. The transformer will be positioned such that it does not interfere with access, operation and maintenance of the pump station. All easements discussed herein are located along the private access road serving the WTP and Foley Family Wines (DBA Merus Wines) and are adjacent to Crystal Springs Road.

Page 34 of 72 ends

DISCUSSION:

PG&E and the City of St. Helena desire to approve and record a Public Utility Easement Deed (the "Easement Deed") pursuant to which the City will grant a public utility easement to PG&E. The Easement Deed authorizes PG&E to access the City's WTP properties in order to install, repair, maintain, operate, and replace their facilities. The easement deed also authorizes PG&E to perform periodic vegetation management, including tree removal, within the easement boundaries.

PG&E agrees to ensure that City Staff are able to access the WTP during construction or maintenance activities. PG&E further agrees to restore the surface of the ground to its prior condition following any of their construction or maintenance activities. PG&E will send notification to City Staff for scheduled maintenance activities and the City agrees to allow emergency activities to be performed without notification. Emergency activities will still be subject to the provisions of City Staff access to the WTP.

In accepting the easement agreement, the City agrees to allow PG&E access to their facilities. The City further agrees to not construct permanent facilities that would obstruct the easement or new underground facilities.

City Staff has reviewed the Public Utility Easement Deed and find it to be satisfactory and beneficial to both the City of St. Helena and PG&E. The City Attorney has also reviewed the Public Utility Easement Deed and finds it to be acceptable.

ENVIRONMENTAL REVIEW:

None.

GOAL:

Goal 2: Improve Infrastructure & Further Environmental Sustainability Goal 3: Pursue Water Security & Sustainable Management of Water Resources ATTACHMENTS:

1. EASEMENT AGREEMENT.v3.PE-35385806-City of St. Helena Final

2. Area Map.PG&E Easement

3. Resolution.Easemnt Deed.PG&E.2026.0

Page 35 of 72 ends

83578.00011\44591233.1
RECORDING REQUESTED BY AND RETURN TO:

PACIFIC GAS AND ELECTRIC COMPANY
300 Lakeside Drive, Suite 210
Oakland, CA 94612
Attn: Land Rights Library
Location: City/Uninc ____________________
Recording Fee $ __________________________
Document Transfer Tax $ __________
[ ] This is a conveyance where the consideration and
Value is less than $100.00 (R&T 11911).
[ ] Computed on Full Value of Property Conveyed, or
[ ] Computed on Full Value Less Liens
& Encumbrances Remaining at Time of Sale
[ ] Exempt from the fee per GC 27388.1 (a) (2); This
document is subject to Documentary Transfer Tax
Signature of declarant or agent determining tax
LD# 2408-06-10133 EASEMENT DEED
CITY OF ST. HELENA, a municipal corporation
hereinafter called Grantor, hereby grants to PACIFIC GAS AND ELECTRIC COMPANY, a California corporation, hereinafter called Grantee, the right from time to time to excavate for, construct, reconstruct, install, replace (of initial or any other size), remove, maintain, inspect and use facilities of the type hereinafter specified, together with a right of way therefor, on, over, and under the easement areas as hereinafter set forth, and also ingress thereto and egress therefrom, over and across the lands of Grantor situated in the unincorporated area of the County of Napa, State of California, described as follows:
(APN 021-420-005)
The parcel of land described in the deed from Lola Ethel Schlette to City of St, Helena dated May 15, 1958 and recorded in Book 569 of Official Records at page 162, Napa County Records. (APN 021-410-012)
The parcel of land described in the deed from Emma Rossini and Marilouise Rossini to City of St, Helena dated November 12, 1958 and recorded in Book 583 of Official Records at page 356, Napa County Records.
(APN 021-420-006)
The parcel of land described in the deed from John K. Sexton and Joan Sexton to Donald L. Coles and Rosalie D. Coles dated February 2, 1990 and recorded in Volume 1715 of Official Records at page 273, Napa County Records.

The facilities and easement areas are described as follows:

Such underground conduits, pipes, manholes, services boxes, wires, cables, and electrical conductors; aboveground marker posts, risers, and service pedestals; underground and aboveground switches, fuses, terminals, and transformers with associated concrete pads; and fixtures and appurtenances necessary to (SPACE ABOVE FOR RECORDER'S USE ONLY)

Page 36 of 72 ends

83578.00011\44591233.1
any and all thereof, as Grantee deems necessary for the distribution of electric energy and communication purposes, that are necessary for Grantee to communicate with Grantee's facilities and no other purpose located within the strips of land, the centerlines of which are described in EXHIBIT “A”, EXHIBIT “C”, and EXHIBIT “E”, and depicted on EXHIBIT “B”, EXHIBIT “D”, and EXHIBIT “F” attached hereto and made a part hereof. .

Grantor further grants to Grantee the right, from time to time, to trim or to cut down, without Grantee paying compensation, any and all trees and brush now or hereafter within said easement areas.

Grantor also grants to Grantee the right to use such portion of said lands contiguous to said easement areas as may be reasonably necessary in connection with the excavation, construction, reconstruction, replacement, removal, maintenance and inspection of said facilities.

Grantor also grants to Grantee the right to excavate, grade, and level the ground, including the right to construct, reconstruct, replace (of initial size or any other size), remove, maintain, and inspect walls to maintain the graded slopes for the protection of Grantee’s public utility facilities located within the easement areas, together with the right to construct and maintain drainage facilities and other appurtenances in connection with the walls.

Upon the completion of any construction activities within said easement area, Grantee shall restore the surface, including paving, vegetation and other improvements to as near as practicable to the condition that existed prior to such construction.

Grantor also grants to Grantee the right to install, maintain, and use aboveground facilities and equipment including, but not limited to cabinets, boxes, a pole-mounted antennae, and other appurtenances (“Aboveground Communication Facilities”) at the locations within the easement areas as shown on EXHIBIT “B” and EXHIBIT “D” for the purpose of transmitting and receiving data to remotely monitor, control, and operate equipment associated with the electric facilities, and the right to install, maintain, and use additional Aboveground Communication Facilities in the future at other locations within the easement areas that will not materially interfere with Grantor’s use of said lands; together with the right to energize and install adequate protection for the Aboveground Communication Facilities.

Grantee shall make multiple reasonable attempts to notify the Grantor prior to performing work in nonemergency situations.

Grantor reserves all rights to use the easement area (above and below ground) for any and all purposes, as long as those rights do not unreasonably interfere with Grantee’s herein granted express rights.

The legal description herein, or the map attached hereto, defining the location of this utility distribution easement, was prepared by Grantee pursuant to Section 8730 (c) of the Business and Professions Code.

Grantee understands that access to the Grantor’s facility is paramount at all times due to its critical facility status. If, due to Grantee’s future maintenance or replacement activities, Grantor’s operations or access is limited, Grantee shall ensure that any limited access for Grantor to Grantor’s facilities is limited in type and time to all that is absolutely necessary for the completion of Grantee’s work, for example in emergency maintenance or replacement situations.

This document may be executed in multiple counterparts, each of which shall be deemed an original, but all of which, together, shall constitute one and the same instrument.

Page 37 of 72 ends

83578.00011\44591233.1
The provisions hereof shall inure to the benefit of and bind the successors and assigns of the respective parties hereto, and all covenants shall apply to and run with the land.

Dated:_____________________, ______ .

CITY OF ST. HELENA, a municipal
corporation
By: ___________________________________
By: ___________________________________
LD # 2408-06-10133
Region: 7
Land Service Office: Sacramento
Line of Business: Electric Distribution (43)
Business Doc Type: Easements
MTRSQ: 24.08.06.11.22, 24.08.06.13.44, 24.0806.11.21
PG&E Drawing Number(s): L-08-06-11, L-08-06-13
PLAT NO. GG33, GG3305, GG34, GG3401
LD of any affected documents: N/A
LD of any Cross-referenced documents; N/A
TYPE OF INTEREST: Electric Underground (4), Communication Easements (6) Order #: 35385806
County: Napa
Prepared By: NV5
Checked By: TST2
Approved By: NXCD, W1PH
Revised by: NXCD

Page 38 of 72 ends

Distribution Easement (Rev.4/2024)
State of California
County of )
On __________________________, before me, Notary Public, Insert name
personally appeared
,
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.
(Seal)
Signature of Notary Public

CAPACITY CLAIMED BY SIGNER
[ ] Individual(s) signing for oneself/themselves
[ ] Corporate Officer(s) of the above named corporation(s) [ ] Trustee(s) of the above named Trust(s)
[ ] Partner(s) of the above named Partnership(s)
[ ] Attorney(s)-in-Fact of the above named Principal(s) [ ] Other
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

Page 39 of 72 ends

Sheet 1 of 2
APN 021-420-005
St. Helena, CA
Exhibit “A”
LANDS:

Real property situated in the unincorporated area of the County of Napa, State of California being more particularly described as follows:

The parcel of land described in the deed from Lola Ethel Schlette to City of St, Helena dated May 15, 1958 and recorded in Book 569 of Official Records at page 162, Napa County Records.

EASEMENT:

A strip of land of the uniform width of 10 feet extending from the easterly boundary line of said lands in a general northwesterly direction, and lying 5 feet on each side of the line described as follows:

COMMENCING at the most southerly corner of said lands and running northerly along said easterly boundary line
a) North 00°00'00" East, 120.33 feet
to the TRUE POINT OF BEGINNING of said line; said point also being the beginning of a nontangent curve, concave easterly, having a radius of 190.00 feet, a radial line to said point bears South 68°59'28" West; thence leaving said easterly boundary line 1) northerly along said 190.00 foot radius curve through a central angle of 19°54'00", an arc distance of 65.99 feet; thence
2) tangent to said curve, North 01°06'32" West, 95.01 feet; thence, 3) North 00°53'00" West, 149.56 feet; thence,
4) North 12°44'05" East, 12.63 feet; thence,
5) North 23°24'40" West, 23.62 feet; thence,
6) North 62°24'00" West, 10.78 feet; thence,
7) North 44°03'22" West, 105.34 feet; thence,
8) North 44°47'39" West, 204.54 feet; thence,
9) South 46°51'33" West, 36.04 feet to the POINT OF TERMINUS.

The sidelines of said strip shall be lengthened or shortened to begin at said easterly boundary line of said lands.

CONTAINING: 7,031 SQ. FT., more or less.

Page 40 of 72 ends

Sheet 2 of 2
APN 021-420-005
St. Helena, CA
The Basis of Bearings for this survey are in terms of California Coordinate System of 1983 (CCS83), Zone 2, EPOCH 2010.

EXHIBIT “B” attached and made a part hereto.

The legal description herein was prepared by me
or under my direction on April 14, 2026.

Page 41 of 72 ends

CITY OF ST. HELENA
APN 021-420-005
569 O.R. 162
LEGEND
PROPERTY LINES ARE APPROXIMATE AND FOR REFERENCE PURPOSES ONLY.

UNLESS OTHERWISE SHOWN, ALL COURSES EXTEND TO OR ALONG BOUNDARIES OR LINES.

PLAT MAP

REFERENCES
EXHIBIT "B"

SHEET OF
SECTION TOWNSHIP RANGE MERIDIAN COUNTY OF:

F.B.: DR.BY: CH.BY:

CITY OF:

PG&E

SCALE DATE
DIVISION AUTHORIZE DRAWING NO.

PG&E - CWSP - SILVERADO 2104 LR 515946 PH 2.1

CRYSTAL SPRINGS ROAD

THE BASIS OF BEARINGS FOR THIS SURVEY ARE IN TERMS OF CALIFORNIA COORDINATE SYSTEM 1983 (CCS01983), ZONE 2, EPOCH 2010.

Page 42 of 72 ends

Sheet 1 of 2
APN 021-410-012
St. Helena, CA
Exhibit “C”
LANDS:

Real property situated in the unincorporated area of the County of Napa, State of California being more particularly described as follows:

The parcel of land described in the deed from Emma Rossini and Marilouise Rossini to City of St, Helena dated November 12, 1958 and recorded in Book 583 of Official Records at page 356, Napa County Records.

EASEMENT:

A strip of land of the uniform width of 10 feet extending from the northerly boundary line of said lands in a general southeasterly direction, and lying 5 feet on each side of the line described as follows:

COMMENCING at the northwesterly corner of said lands and running easterly along said northerly boundary line and the northerly boundary line of Section 13, Township 8 North, Range 6 West, Mount Diablo Base and Meridian
a) South 88°23'08" East, 258.08 feet
to the TRUE POINT OF BEGINNING of said line; thence leaving said northerly boundary line 1) South 79°57'21" East, 106.56 feet; thence
2) South 46°10'55" East, 19.57 feet; thence
3) South 79°15'37" East, 15.00 feet
to a point hereinafter referred to as Point “A”; thence continuing 4) South 79°15'37" East, 195.05 feet, more or less
to the westerly right of way line of Crystal Springs Road; said point being a POINT OF TERMINUS.

Also, BEGINNING at the hereinabove described Point “A”; thence 5) South 12°12'41" East, 5.05 feet; thence
6) South 06°08'17" West, 20.00 feet to a POINT OF TERMINUS.

The sidelines of said strip shall be lengthened or shortened to terminate at said northerly boundary line of said lands and said westerly right of way line of Crystal Springs Road.

CONTAINING: 3,558 SQ. FT., more or less.

Page 43 of 72 ends

Sheet 2 of 2
APN 021-410-012
St. Helena, CA
The Basis of Bearings for this survey are in terms of California Coordinate System of 1983 (CCS83), Zone 2, EPOCH 2010.

EXHIBIT “D” attached and made a part hereto.

The legal description herein was prepared by me
or under my direction on April 14, 2026.

Page 44 of 72 ends

CITY OF ST. HELENA
APN 021-410-012
583 O.R. 356

FOLEY FAMILY WINES
APN 021-420-045

CRYSTAL VINES, LLC
APN 021-410-013
CITY OF ST. HELENA APN 021-420-021
SECTION 13
SECTION 12
1" = 100'

CRYSTAL SPRINGS ROAD

CRYSTAL SPRINGS ROAD
LEGEND

SECTION TOWNSHIP RANGE MERIDIAN

SCALE DATE
CITY OF:

DIVISION AUTHORIZE DRAWING NO. PG&E
COUNTY OF:

F.B.:

PROPERTY LINES ARE APPROXIMATE AND FOR REFERENCE PURPOSES ONLY.

UNLESS OTHERWISE SHOWN, ALL COURSES EXTEND TO OR ALONG BOUNDARIES OR LINES.

PLAT MAP

REFERENCES
DR.BY: CH.BY:
4/14/2026
EXHIBIT "D"

SHEET OF
PG&E - CWSP - SILVERADO 2104 LR 515946 PH 2.1

THE BASIS OF BEARINGS FOR THIS SURVEY ARE IN TERMS OF CALIFORNIA COORDINATE SYSTEM 1983 (CCS01983), ZONE 2, EPOCH 2010.

Page 45 of 72 ends

Sheet 1 of 1
APN 021-420-006
St. Helena, CA
Exhibit “E”
LANDS:

Real property situated in the unincorporated area of the County of Napa, State of California being more particularly described as follows:

The parcel of land described in the deed from John K. Sexton and Joan Sexton to Donald L. Coles and Rosalie D. Coles dated February 2, 1990 and recorded in Volume 1715 of Official Records at page 273, Napa County Records.

EASEMENT:

A strip of land of the uniform width of 10 feet extending from the westerly boundary line of said lands, and lying 5 feet on each side of the line described as follows:

COMMENCING at the southwesterly corner of said lands and running northerly along said westerly boundary line
a) North 00°25'27" West, 254.17 feet
to the TRUE POINT OF BEGINNING of said line; said point also being the beginning of a nontangent curve, concave westerly, having a radius of 396.00 feet, a radial line to said point bears South 70°20'56" East; thence leaving said westerly boundary line 1) northerly along said 396.00 foot radius curve through a central angle of 25°34'31", an arc distance of 176.76 feet; thence,
2) tangent to said curve, North 05°55'28" West, 62.44 feet; thence 3) South 87°22'27" West, 16.26 feet, more or less, to the westerly line of said lands and the POINT OF TERMINUS.

The sidelines of said strip shall be lengthened or shortened to begin and terminate at said westerly boundary line of said lands.

CONTAINING: 2,552 SQ. FT., more or less.

The Basis of Bearings for this survey are in terms of California Coordinate System of 1983 (CCS83), Zone 2, EPOCH 2010.

EXHIBIT “F” attached and made a part hereto.

The legal description herein was prepared by me
or under my direction on April 14, 2026.

Page 46 of 72 ends

CITY OF ST. HELENA
APN 021-420-006
1715 O.R. 273

TOWNSHIP RANGE MERIDIAN

SCALE DATE
CITY OF:

DIVISION AUTHORIZE DRAWING NO. PG&E
COUNTY OF:

F.B.:

PROPERTY LINES SHOWN ARE APPROXIMATE AND FOR REFERENCE PURPOSES ONLY.

UNLESS OTHERWISE SHOWN, ALL COURSES EXTEND TO OR ALONG BOUNDARIES OR LINES.

PLAT MAP

REFERENCES
DR.BY: CH.BY:

EXHIBIT "F"
PG&E - CWSP - SILVERADO 2104 LR 515946 PH 2.2
SHEET 1 OF 1

SECTION

AMULET ESTATE LLC
APN 021-420-048

CANAPANY LLC
APN 021-420-049

CITY OF ST HELENA
APN 021-420-005
LEGEND

THE BASIS OF BEARINGS FOR THIS SURVEY ARE IN TERMS OF CALIFORNIA COORDINATE SYSTEM 1983 (CCS01983), ZONE 2, EPOCH 2010.

Page 47 of 72 ends
Page 48 of 72 ends

CITY OF ST. HELENA
RESOLUTION NO. 2026-
Consideration and Approval of a Resolution Accepting the Public Utility Easement Deed Between the City of St. Helena And PG&E and Authorization to Record the Easement with the County of Napa.

RECITALS
A. PG&E wishes to relocate existing overhead electrical utilities underground; and B. PG&E has requested easements from the City of St. Helena to cross land owned by the City for these proposed underground utilities; and C. The location of these easements are on parcels APN 021-420-005, APN 021-410- 012 and APN 021-420-006, collectively parts of the Louis Stralla Water Treatment Plant (WTP); and
D. The relocation of the overhead electrical facilities underground is beneficial to both the City of St. Helena and PG&E; and
E. The City of St. Helena and PG&E desire to enter into an agreement to accept and record a Public Utility Easement Deed between the two entities; and F. City Staff have reviewed the Public Utility Easement Deed and find it to be satisfactory and beneficial to both the City of St. Helena and PG&E; and G. The City Attorney has reviewed the Public Utility Easement Deed and find it to be acceptable.

RESOLUTION
NOW, THEREFORE, the City Council of the City of St. Helena resolves as follows:

1. Authorizes the City Manager to accept the Public Utility Easement Deed between the City of St. Helena and PG&E; and

2. Authorizes the City Clerk to record the Public Utility Easement Deed; and Approved at a regular meeting of the St. Helena City Council on April 28, 2026 by the following vote:

Mayor Dohring: __________
Vice Mayor Deasy: __________

Page 49 of 72 ends

Council Member Barak: __________
Council Member Kate Spadarotto: __________
Council Member Summers: __________
APPROVED: ATTEST:
_____________________________ ___________________________ Paul Jamison Dohring, Mayor Andrew Bradley, City Clerk

Page 50 of 72 ends

Agendas Report to the City Council
Agenda Section: NEW BUSINESS
Department: Public Works Department
DATE: April 28, 2026
FROM: Bruce Zaeni, Project Manager
SUBJECT: Receive and File Water Treatment Plant Condition Assessment

RECOMMENDED
ACTION:

Receive and file the report.

PREVIOUS COUNCIL
ACTION:

Resolution 2023-146, adopted on November 14, 2023,
authorized the execution of a Professional Services
Agreement with West Yost for an amount not-to-exceed
$267,428 for engineering services to conduct a condition assessment of the Louis Stralla Water Treatment Plant for CIP Project W18-111.

STATEMENT OF THE
PURPOSE:

To receive and file the Water Treatment Plant Condition Assessment Report dated June 6, 2025.

FINANCIAL IMPACT: The action does not have a fiscal impact. The recommendations from the report will be incorporated into subsequent capital and operating budgets.

CEQA DETERMINATION: Not a CEQA Project (CEQA Guidelines §15378) BACKGROUND:

The purpose of this report is to present the results of an assessment of the Louis Stralla Water Treatment Plant (LSWTP). The LSWTP is located at 410 Crystal Springs Road and is owned and operated by the City of St. Helena (City). Over the last ten years, LSWTP has provided between 1/4 to 1/3 of the total water supply to the City. As a critically essential facility, staff was concerned about the LSWTP facility, namely the age and condition of various systems, processes, and equipment due to years of perceived deferred maintenance. In 2023, the City Council authorized execution of a professional services agreement with West Yost Associates to assess the LSWTP's current condition, operational requirements, and associated risk levels. In the near term, the City was interested in identifying prioritized condition and operations-related improvements and to improve operational reliability and simplicity during the next 5 to 15 years, assuming a small number of operators working at the LSWTP. The longerterm plan for the LSWTP would be examined as part of a separate, future study.

Page 51 of 72 ends

The scope of the consultant contract included the following:
• Project management and coordination
• Data collection and review of historical documents, schematics, operating records, and interviews with staff.
• Conduct a condition and risk assessment of the LSWTP assets and remaining useful life analysis.
• Develop recommendations for optimizing operations of the LSWTP with limited staff and with challenging water quality conditions
• Identify any age-related deficiencies among the control system hardware and software components.
• Develop a report for improvements related to CIP and Operations and Maintenance. The resulting report will summarize evaluations, findings, and document recommendations.

The City's primary objectives in preparing this report are summarized as follows:
• Assess existing WTP's current condition, operational requirements, and associated risk levels.
• Identify prioritized condition and operations-related improvements to improve operational reliability and simplicity, including the LSWTP's automation capabilities, during the next 5-15 years.
• Identify alternative means and methods that might be implemented to enhance water quality and/or result in a simpler, more modern treatment process.

The major topics addressed in this report include:
• Summary of Existing Facilities
• Water Quality Characterization and Performance Assessment • On-Site Condition Assessment
• Risk Assessment
• Recommended Capital Improvement Projects
DISCUSSION:

As stated above the infrastructure of the LSWTP is aging. Recent issues regarding water discoloration have brought into question the condition and the lifespan of the facility. The production of compliant, reliable, and quality water is an obligation, and this study will allow us to identify and plan for necessary upgrades to service to maintain all three.

This Executive Summary report prepared by West Yost Associates provides an overall view of the risks and lays out a methodical approach to categories of improvements to

Page 52 of 72 ends

consider. The recommended improvements are grouped into three categories including:
• Immediate term
• Near-term
• Long-term
Major Findings

1. General Plant Condition
The facility is in good to fair overall condition, with core treatment processes continuing to meet operational needs.

A significant portion of the plant’s mechanical and electrical equipment is 30–45 years old and has exceeded its expected service life.

Continued reliance on aging components increases the risk of unplanned outages and higher maintenance costs.

2. Electrical and Mechanical Systems
Several motor control centers (MCCs), pumps, mixers, and valves are original to the 1979–1994 construction era.

Many components require frequent reconditioning and are no longer supported by manufacturers.

Replacement of MCC-2M and MCC-1M is identified as a priority to maintain operational reliability.

3. Chemical Storage and Safety
Existing chemical tanks, containment areas, and piping systems show deterioration and corrosion.

Improvements are needed to meet current best practices for:
-Secondary containment
-Chemical segregation
-Worker safety and access
Upgrades will reduce risk of spills, cross-contamination, and regulatory non-compliance.

4. Controls, SCADA, and Cybersecurity
The plant’s SCADA servers (i.e. prior to server upgrades authorized in November 2025), network switches, and control hardware are obsolete and unsupported.

Limited integration of process equipment into SCADA reduces monitoring and automation capabilities.

Cybersecurity vulnerabilities require near-term attention to align with modern standards and protect critical infrastructure.

5. Structural and Seismic Considerations
Structural review identified seismic deficiencies, including roof-to-wall anchorage issues in the control building and chemical facilities.

Improvements are recommended to enhance resilience during seismic events and ensure safe access for operators.

Page 53 of 72 ends

6. Treatment Performance
Total Organic Carbon (TOC) removal generally meets regulatory requirements.

Turbidity performance is inconsistent, with occasional exceedances of optimization targets.

Periodic disinfection byproduct (DBP) exceedances in the distribution system indicate the need for:
-Improved treatment consistency
-Potential upgrades to treated water storage mixing and ventilation systems

7. Asset Risk Assessment
The assessment evaluated 229 individual assets for the likelihood and consequence of failure.

Approximately 50% of assets fall into the Medium Risk category.

Six assets are classified as High Risk, primarily electrical and control systems critical to plant operations.

Highest-risk process areas include filtration, chemical addition, flocculation/sedimentation, treated water storage, and the high-lift pump station.

Recommended Capital Improvements
Immediate (0–5 Years):

Plantwide SCADA modernization and cybersecurity upgrades Pretreatment and filtration optimization studies
Replacement of MCC-2M and critical valve operators
Evaluation and upgrades to treated water tank mixing and ventilation Near-Term (6–10 Years)
Replacement of MCC-1M
Structural/seismic improvements to control and reservoir outlet facilities Chemical storage and piping rehabilitation
Replacement of aging pretreatment equipment (flocculators, mixers, sludge collectors) Corrosion control and coating improvements
Evaluation of returning Tank 1 to service
Long-Term (11–15 Years)
Rehabilitation of the original Bell Canyon chemical building Improvements to flash mix vault access and mechanical systems Replacement of backwash pumps, high-lift pumps, and MCC-3M Miscellaneous improvements to clearwell, washwater, and sludge lagoon systems Estimated Capital Cost
Timeframe Estimated Cost (Future Dollars)
Immediate (0–5 years) $1.8 million
Near-Term (6–10 years) $4.7 million
Long-Term (11–15 years) $2.7 million

Page 54 of 72 ends

Total (15-year horizon) $9.2 million
Cost estimates assume 2% annual inflation to mid-construction period.

The assessment confirms that while the LSWTP continues to meet current operational needs, several critical systems are at or beyond their useful life. A phased capital improvement program will allow the City to address the most urgent deficiencies, reduce operational risk, and ensure long-term regulatory compliance and service reliability.

It should be noted that the full and detailed report can be made available to City Council members in private, if requested. However, for homeland security reasons, we are not sharing the sensitive city water system and service reliability.

On February 12, 2026, the Executive Summary was presented to the Water and Wastewater Adivsory Committee. While members of the Committee lamented on the absence of the full report for the discussion, staff provided the opportunity for members to view the report through an in-person appointment. All five regular members of the Committee voted to recommend the report be taken to City Council for consideration.

ENVIRONMENTAL REVIEW:

GOAL:

Goal 2: Improve Infrastructure & Further Environmental Sustainability Goal 3: Pursue Water Security & Sustainable Management of Water Resources Goal 8: Implement Capital Improvement Plans (CIP) Projects Miscellaneous/Other ATTACHMENTS:

1. LSWTP Condition Assessment Executive Summary

2. Presentation - Water Treatment Plant Condition Assessment

Page 55 of 72 ends

100 Howe Avenue
Suite 110S
Sacramento CA 95825
916.306.2250 phone
530.756.5991 fax
westyost.com

TECHNICAL MEMORANDUM
DATE: January 29, 2026 Project No.: 705-50-23-14
SENT VIA: EMAIL
TO: Joseph Leach, PE, City of St. Helena
CC: Bruce Zaeni, PE, City of St. Helena
FROM: Andy Smith, RCE #74673
SUBJECT: Executive Summary of Louis Stralla Water Treatment Plant Condition Assessment Report

INTRODUCTION AND PURPOSE
The City of St. Helena (City) conducted an assessment to better understand the current condition, performance, and risks associated with the Louis Stralla Water Treatment Plant (LSWTP). The facility, originally constructed in 1979 and last upgraded in 1994, is the City’s surface water treatment plant and one of several sources of drinking water for the City. It treats water from the Bell Canyon Reservoir using conventional processes that include coagulation, flocculation, sedimentation, filtration, and disinfection with chlorination. A schematic representation of the LSWTP treatment process is shown in Figure 1.

The assessment was designed to help promote the community’s long-term access to safe, reliable drinking water by:
 Documenting the condition of existing facilities and equipment  Evaluating water quality and treatment performance relative to regulatory standards  Assessing risks associated with asset failure, including structural, operational, and seismic vulnerabilities
 Prioritizing improvements that will enhance reliability, simplify operations, and support regulatory compliance
The work included review of historical records, analysis of five years of operational and water quality data, on-site inspections, interviews with plant staff, and specialized seismic and corrosion evaluations.

This Executive Summary is organized as follows:
 Introduction and Purpose
 Key Condition Assessment Findings
 Risk Assessment Results
 Recommended Improvements
 Estimated Investment Needs
 Final Summary

Page 56 of 72 ends

BELL CANYON RESERVOIR LIQUID ALUM CATIONIC POLYELECTROLYTE SPARE CHEMICAL CAUSTIC SODA NON-IONIC POLYELECTROLYTE ACTIVATED CARBON SODIUM HYPOCHLORITE CLEARWELL FILTER BASINS FLOCCULATION / SEDIMENTATION BASINS RECLAIMED WATER PUMPING STATION WASHWATER RECLAMATION BASIN NO. 1 WASHWATER RECLAMATION BASIN NO. 2 DIVERSION STRUCTURE 1.4 MG STORAGE TANK HIGH SERVICE PUMPS CLEARWELL FILL LINE FLOW METER TODISTRIBUTION BACKWASH PUMP HIGH LEVEL EMERGENCY OVERFLOW SERVICE WASH PUMP SAMPLE TO LAB FILTER BACKWASH FILTER EFFLUENT FILTER TO WASTE FILTER MEDIAWASH TROUGH FILTER #2 FILTER #1 CHEMICAL FLOW DISTRIBUTION PANEL, IN FILTRATION / PUMPING FACILITY DAM RAW WATER INTAKE TOWER FLASH MIXER PLANT INFLUENT METER FLOW CONTROL VALVES FLOCCULATORS FLOW SPLIT WEIR EMERGENCY OVERFLOW LAUNDER SLUDGE COLLECTOR SAMPLE TO LAB WASTE WASHWATER RECLAIMED WATER FLOW METER EMERGENCY OVERFLOW CLARIFIED RECLAIMED WATER FLOATING INTAKE, TYP BASIN DRAIN LINE, TYP N:\Clients\705 St Helena\50-23-14 LSWTP Cond Assmnt\CAD\Figures\70550-2314-Fig 1.dwg 6/6/2025 2:37 PMasmith City of St. Helena Existing WTP Process Flow Diagram Figure 1 LSWTP Condition Assessment

Page 57 of 72 ends

TM – City of St. Helena
January 2026

Page 3 ends

X-X-XXX-XXX-XXX

KEY CONDITION ASSESSMENT FINDINGS
The following summarizes key findings from the condition assessment of the LSWTP’s structures, equipment, instrumentation, and software systems:
 General Condition: The LSWTP is in overall good to fair condition, with most structures sound and many process units still performing adequately. However, much of the plant’s equipment is over 30 years old and beyond its anticipated useful life.  Aging Electrical and Mechanical Equipment: Several original motor control centers (MCCs), pumps, mixers, and valves have exceeded service life. Continued operation is possible only through periodic reconditioning. This approach is not sustainable long-term.  Chemical Storage and Safety: Many original chemical storage tanks and associated piping are deteriorated. Improvements are needed to ensure safe handling, secondary containment, and segregation of incompatible chemicals.  Controls and Automation: Outdated SCADA servers, network switches, and control hardware are no longer supported by manufacturers and are vulnerable to cybersecurity risks. Integration of equipment into SCADA would improve monitoring, control, and efficiency.
 Resilience and Safety: Seismic assessments found deficiencies in several structures, including roof-to-wall anchorage in control and chemical buildings. Improvements will be needed to enhance worker safety and ensure reliable operation during seismic events.

Additionally, the following summarizes recent historical water quality performance of the LSWTP:
 Total Organic Carbon (TOC) removal generally exceeds regulatory requirements.  Turbidity data show inconsistencies and periodic exceedances of optimization goals, highlighting the need for pretreatment and filter optimization.  Distribution system monitoring has identified occasional exceedances of disinfection byproduct (DBP) standards, underscoring the need for improved treatment consistency and potential distribution system tank mixing and/or ventilation upgrades.

RISK ASSESSMENT RESULTS
A structured risk assessment was performed considering likelihood of failure (LOF) and consequence of failure (COF) for each asset and process area.
 Nearly half of the 229 plant assets assessed fall into the “Medium Risk” category.  Six assets (≈3%) are rated as “High Risk”, primarily electrical and control systems where failure would immediately impact treatment operations.
 Process areas with the highest overall risk include filtration, chemical addition, flocculation/sedimentation, treated water storage, and the plant’s high lift pump station.

A visual representation of asset risk by process area is shown in Figure 2. The risk assessment prioritization informed the capital improvement recommendations to ensure the most critical vulnerabilities are addressed first.

Page 58 of 72 ends

TM – City of St. Helena
January 2026

Page 4 ends

X-X-XXX-XXX-XXX
Figure 2. Risk Levels of Assets by Process Area, Percent of Total

RECOMMENDED IMPROVEMENTS
The assessment identified a range of projects grouped into immediate (0–5 years), near-term (6–10 years), and long-term (11–15 years) implementation horizons. Recommendations were prioritized based on asset condition findings, risk assessment results, and impact on water quality or regulatory compliance.

Immediate-Term (0–5 years):
 Plantwide automation and cybersecurity upgrades.
 Optimization studies for pretreatment and filtration processes.  Replacement of MCC-2M (electrical control) and key valve operators.  Evaluation of treated water storage tank mixing and ventilation improvements.

Near-Term (6–10 years):
 Replacement of MCC-1M and additional structural modifications to control and reservoir outlet facilities.
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Percent of Total Number of Assets in Risk Level Per Process Area High Med-High Medium Med-Low Low

Page 59 of 72 ends

TM – City of St. Helena
January 2026

Page 5 ends

X-X-XXX-XXX-XXX
 Chemical storage and piping upgrades, including new tanks and secondary containment.  Pretreatment equipment replacement (flocculators, mixers, sludge collectors).  Coating rehabilitation and other corrosion-control measures.  Structural/corrosion evaluation of Tank 1 to determine feasibility of returning it to service.

Long-Term (11–15 years):
 Rehabilitation of the original Bell Canyon chemical building.  Flash mix vault access and mechanical improvements.
 Replacement of backwash and high-lift pumps, MCC-3M, and other end-of-life equipment.  Miscellaneous clearwell, filter washwater, and sludge lagoon improvements.

ESTIMATED INVESTMENT NEEDS
The total estimated cost to implement the recommended improvements over a 15-year horizon is approximately $9.2 million, as summarized in Table 1:

Table 1. Summary of Estimated Costs for Recommended Improvements Improvement Time Frame Estimated Cost, Future Dollars(a) Immediate-Term (0-5 years) $1.8 million
Near-Term (6-10 years) $4.7 million
Long-Term (11-15 years) $2.7 million
TOTAL $9.2 million
(a) Assumes 2.0 percent annual inflation through the estimated midpoint of construction.

These figures reflect planning-level total capital cost estimates and may vary with inflation, implementation timing, bidding conditions, and other project-specific factors.

FINAL SUMMARY
The overall assessment results and LSWTP prognosis can be summarized as follows:
 The LSWTP is generally sound but contains a significant amount of aging infrastructure that must be proactively addressed.
 Investments are required to modernize electrical and control systems, upgrade chemical storage and safety, and replace critical treatment equipment.  Optimization studies should be undertaken early to fine-tune pretreatment and filtration performance and reduce DBP risks.
 A phased capital improvement program will spread costs over time while focusing first on the highest-risk items, ensuring continued reliability, safety, and regulatory compliance for the City’s surface water treatment facility.
 Together, these investments will help protect St. Helena’s drinking water supply for decades to come.

Page 60 of 72 ends

Water Treatment Plant
Condition Assessment
Joseph Leach, P.E.

Assistant City Manager, Director of Public Works, City Engineer

Page 61 of 72 ends

Purpose of Assessment
Evaluate condition and
performance of the
Water Treatment Plant
Identify risks and
vulnerabilities
Prioritize improvements Ensure long-term safe,
reliable drinking water

Page 62 of 72 ends

Overall Condition
Generally good to fair condition
Many assets are 30-45 years old
Equipment beyond useful life
Increasing maintenance needs

Page 63 of 72 ends

Key Issues
Identified
Aging electrical & mechanical systems
Deteriorating chemical storage
Outdated SCADA and controls
Seismic and structural deficiencies

Page 64 of 72 ends

Water Quality Findings
TOC removal meets standards
Turbidity inconsistencies
Occasional DBP exceedances
Need for treatment optimization

Page 65 of 72 ends

Risk Assessment
Highest risk areas:

Filtration Chemical
Systems Storage Pump Station
229 assets evaluated

Page 66 of 72 ends

Immediate Improvements (0-5 Years)
SCADA modernization & cybersecurity
Pretreatment & filtration optimization
Replace MCC-2M
Tank mixing & ventilation improvements

Page 67 of 72 ends

Near-Term Improvements (6-10 Years)
Replace MCC-1M
Structural & seismic upgrades
Chemical storage upgrades
Replace pretreatment equipment

Page 68 of 72 ends

Long-Term Improvements (11-15 Years)
Rehabilitate chemical building
Upgrade flash mix systems
Replace pumps & MCC-3M
Misc. system improvements

Page 69 of 72 ends

Estimated
Costs
•$1.8M Immediate
Improvements
(0-5 Years)
•$4.7M Near-Term
Improvements
(6-10 Years)
•$2.7M Long-Term
Improvements
(11-15 Years)
Total •$9.2M

Page 70 of 72 ends

Key Takeaways
Facility is aging but functional
Critical systems at risk
Phased investment approach
recommended
Ensures long-term reliability &
compliance

Page 71 of 72 ends

Questions

Page 72 of 72 ends
← All documents from this meeting