Cities Index.
Agenda packet

St. Helena City Council
May 5, 2026

Document
Agenda packet
Meeting
May 5, 2026
Body
St. Helena City Council
Pages
1,051
Original file
189.3 MB
Text extracted from the city's file for reading and search. Open the original on sthelenaca.api.civicclerk.com. That file is the official record.

30 Existing Conditions Grocery stores should also be considered in key destinations 33 Existing Conditions Spring Street going west beyond City limit on to White Sulphur Springs needs to be evaluated and included. 34 Existing Conditions Crossing Assessment should include need for and recently passed state law regarding daylighting. 36 Existing Conditions Key for Bicycle LTS labels roads as “arterial & collector” instead of Low or High LTS 38 Existing Conditions When space gets constrained, the first solution tends to be to downgrade the bike facilities to shared-road facilities, even if that is not the lowest-stress or what is planned for the street – see Oak Avenue Vine Trail alignment, Spring Street discussions, and the Class III portions of South Crane and Grayson for examples. How can the City be better equipped to shift space away from vehicles and to appropriate bicycle facilities when the need calls for it? 38 Existing Conditions Connectivity Needs Assessment should include gaps in bicycle network in its key challenges 39 Existing Conditions Shared micromobility services should be integrated with accompanying education to avoid increasing unsafe road user behavior.

Should also follow infrastructure improvements so that there are safe and comfortable facilities for these users to use to avoid unintentionally increasing road user conflicts (for example, e-scooters on sidewalks because road does not feel safe) 43 Network-wide
Recommendations
Madrona from Hudson to Riesling is narrow. Suggest class III instead of bike lanes (class II) 43 Network-wide
Recommendations
Include application of bike lane buffers and rumble strips on Silverado Trail for any Silverado Trail segment that falls under City jurisdiction where this is feasible
43 Network-wide
Recommendations
Update College Ave to proposed Class I by widening existing sidewalk – the Montessori School has expressed interest in better, more separated bike facilities from Pope to the school and many kids & parents are not going to feel safe/comfortable bike on a Class III to the Montessori during drop-off period
43 Network-wide
Recommendations
Are Class IIs realistic on Allyn & Hudson? With residences, unlikely that parking will be removable to make space. Might be better to make a Class III bike boulevard with traffic-calming. These are neighborhood streets that should be slowed down, especially as both motorists use them as cut-throughs and bicyclists use them to get to quieter side street routes. 43 Network-wide
Recommendations
Elmhurst – Consider a Class II/Class III combo given steep incline, which could benefit from a separated space for bicyclists, especially given connection to Vine Trail
43 Network-wide
Recommendations
Pratt Avenue along the Vine Trail alignment should be Class I, not Class II. 44 Network-wide
Recommendations
Show proposed Class I path on Spring Street on the map and in the list of projects. Do not remove existing Class II bike lanes on Spring Street. If there are verified issues coming up around those bike lanes, try to adjust and problem solve before just removing bike lanes. 44 Network-wide
Recommendations
Entire Pope Street corridor needs improvement, but it is only listed for a Class I from Starr to Silverado Trail and no other upgrades. This plan mentions earlier that bike facilities would be upgraded to Class I for entire corridor, but it isn’t shown in proposed bike facilities.

Also, existing facilities map shows Class II bike lanes where there are Class IIIs. 45 Network-wide
Recommendations
General comment on ADA requirements at crosswalks. The yellow raised bumps are very irritating to those in wheel chairs. There needs to be a smoother alternative to this while keeping it's purpose intact, presumably to help blind folks. 45 Network-wide
Recommendations
Fill Oak Ave Class III gap for continuous access to middle school 45 Network-wide
Recommendations
Fill bicycle facilities gap between where Class IIs are shown to end on Madrona and Vine Trail access on Fulton 45 Network-wide
Recommendations
There should also be a proposed Class I on Mills according to other plans. 45 Network-wide
Recommendations
Existing Class IIs on Starr Ave are not shown
46 Network-wide
Recommendations
No mention in plan of the realignment of Mills Lane with Grayson Ave to create a new four-way intersection, which has significant implications given the high school and proposed housing 46 Network-wide
Recommendations
Main at Vintage Ave needs crossing improvements with future Vine Trail installation given walkability from high school and location of pediatrician and orthodontist
46 Network-wide
Recommendations
Main at Pratt needs bulb-outs and/or traffic-calming/gateway treatment for southbound traffic coming in at higher speeds 47 Network-wide
Recommendations
Hunt & Edwards – include bulb-outs to help improve crossing and traffic-calm Hunt 47 Network-wide
Recommendations
Add bulb-outs at Hillview at the middle school entrance – painted curb extensions show desire for this improvement 47 Network-wide
Recommendations
Pope & Starr needs vegetation management to improve RRFB visibility 47 Network-wide
Recommendations
#11 crossing at main/1000 main. Why needed. Close to Charter oak crossing 47 Network-wide
Recommendations
Crossing improvements needed at Main & Grayson with Mills realignment, given upcoming Farmstead hotel project and Our Town St Helena affordable housing project going in. Crosswalks needed on all four legs of intersection, as well as sidewalk connection to intersection on south side of realigned Mills (on north end of affordable housing project). 47 Network-wide
Recommendations
I live on Chiles Ave. and the situation the potential for a severe crash is huge when trying to turn left from Chiles Avenue onto Pope Street if there cars parked on Pope Street anywhere near the intersection. I couldn't find any reference to extending the red curbs along this stretch of road adjacent to the intersection even with the 20 feet of it as per the new law. But, quite frankly, 20 feet is not enough given the situation and likelihood of being struck by a car when trying to inch one's way safely from Chiles Avenue onto Pope Street. 48 Network-wide
Recommendations
Supportive of bulb-outs at Spring & Kearney for traffic-calming and improved pedestrian visibility at uncontrolled crosswalk 48 Network-wide
Recommendations
Spring & Valley View – add curb extensions

Page 153 of 1051 ends

48 Network-wide
Recommendations
Curb extensions at Madrona and Kearney need to be extended 48 Network-wide
Recommendations
Adams & Oak should not be listed as not needing any improvements. We hear a lot of concern about this intersection given how heavily travelled it is and its vicinity to elementary school & downtown. Will also be a key intersection in Vine Trail alignment. Frequently hear and see people not stopping at stop signs. Should receive treatment like curb extensions or a raised intersection. 49 Network-wide
Recommendations
There is desire for Hillview and Kearney to have bulb-outs given the paint put down there. Should not be listed as no improvements needed.
49 Network-wide
Recommendations
Adams and Kearney – need to improve sightlines at crosswalks across Adams. Right now cars can park in loading zone or curbside too close to crosswalks especially in an elementary school zone. Need to add red curb or bulb-out. 49 Network-wide
Recommendations
Fill bicycle facilities gap between where Class IIs are shown to end on Madrona and Vine Trail access on Fulton 50 Network-wide
Recommendations
More bike traffic should be expected and accommodated crossing Silverado Trail at Pope with Howell Mountain Road segment being converted to bike/ped trail. Especially with plans discussed in Appendix to realign Pope Street to be a single intersection with Silverado Trail and Howell Mountain Road. The trail will not be adding parking so bicyclists will be directly accessing. 57 Implementation Surprised at how low Main at Pratt is on prioritization – maybe this should be re-evaluated given NVTA Michelin Mobility Intelligence Road Safety Risk Report (2025) results, which identify this area as high-risk for vulnerable road users and motorists due to high traffic volumes, unsignalized crossings, and aggressive driving behaviors. They recorded frequent high-speed and severe braking events in this area.
58 Implementation Address how roadway extension projects impact City General Plan goals around reducing VMT. 59 Implementation Why are cost ranges only shown for bicycle facilities and not for other proposed projects in this plan? Show all cost ranges to provide complete context of what potential costs of projects.
59 Implementation Cost ranges for bike facilities way too high, particularly for Class I and Class II. There may be some exceptional projects that are higher than the average cost, but the lower end of the cost range should definitely be lower. 68 Transitioning from a sidepath to slightly wider sidewalks closer to downtown will need to include a transition plan for bicyclists.

Otherwise, bicyclists will continue on the sidewalk because it’s more comfortable and separated and they may not know that it has shifted to a sidewalk rather than a sidepath.
69 Valley View to Hudson – narrow travel lanes to 10.5’ and give that extra foot to the shared-use path. As much space as possible on the sidepath is necessary for safe and comfortable sharing between pedestrians, kids on bikes, and less confident bicyclists. 69 Spring St shared-use sidepath is going to need to be identifed as usable by bicyclists and pedestrians, given the unconventional street design of the corridor with the sidepath and two sidewalks 70 We support the Kearney/Spring intersection improvements – will help calm Spring St traffic and improve pedestrian visibility and safety, as well as removing a parking space that shouldn’t be used due to its visibility obstruction. 70 I live on Spring Street at the Kearny intersection. I disagree with the need to add another crosswalk to the one already existing. I also disagree with the curb extension. That would eliminate a parking spot. Parking is already a 71 The Adams St extension will place a new roadway on top of the city owned and operated levee. So, my questions are 1) If the Adams Extension Project costs $60 million, and the levee fails, who will pay for the road to be replaced? And, who will be liable for the cost of the actual levee failure, levee replacement and property damage to the Hunter proposed project homes, Vineyard Valley and Hunt's Grove. (Presently, the City of St Helena took ALL financial liability for the levee in CA State Assembly Bill 1898). Question 2: The funding St Helena recieved to construct the levee required the City to not use any part of the project for municipal purposes, bc the the funding was granted on the basis of Flood Control Use only. How is the City going to get approval for using part of the levee for municipal purposes? Question 3: What is the process to get the private property owner on the east side of the river to grant right of way for the bridge and how much will that cost the City to purchase it or pay for eminent domain? 77 Plan should make it very clear that the diagrams of the proposed Oak Ave extension project are outdated and should not be used as guidance – 4-foot bike lanes on a street with 12’ travel lanes would NOT be considered best practice today. Strongly oppose suggestions from previous, outdated plans that recommend a 40-mph speed limit; this extension should match the character of the existing Oak Avenue and neighborhoods around it. Plan should also recommend option of making extension a Class I shared-use path only if full road extension is not feasible.

Page 154 of 1051 ends

St Helena Streets Master Plan
Appendix C
Project Prioritization Methodology +
Detailed Results

Page 155 of 1051 ends

November 11, 2024
To: Joseph Leach, City of St. Helena
From: Anjulie Palta and Lauren Pepe, Toole Design
Project: St. Helena Streets Master Plan
Re: Project Prioritization Methodology
All recommendations in the Streets Master Plan will take time and resources to implement. Recognizing funding and capacity constraints, as well as feasibility challenges, recommended infrastructure projects will be prioritized through a data-driven process, informed by public input. Bicycle facility, pedestrian crossing, bridge realignment, and road extension projects will be prioritized based on the criteria summarized in the table below and explained further on the following pages. Each project will receive points based on each criterion, with total points determining their relative ranking. Bicycle/pedestrian projects rely on different criteria than road/bridge projects.

The results of prioritization will help the project team develop an implementation plan and timeline with high, medium, and low priority projects. This process will also enable the team to strategically select a handful of highimpact initiatives to advance into conceptual design. By identifying top-priority projects, the team can focus on those with the greatest potential to benefit the community and achieve key project goals. This approach ensures that resources are allocated efficiently, concentrating efforts on projects that deliver the most meaningful impact and establishing a clear foundation for phased, effective progress.

Prioritization Overview
Prioritization
Criterion
Description Score
Bicycle and Pedestrian Projects
Access Prioritizing access to community-identified
destinations with a specific emphasis on schools and
parks
Yes (2 points) or No (0 points)
Safety Prioritizing safety needs based on where crashes have occurred in the past
High (2 points), Medium (1 point), or
Low (0 points)
Connectivity
and Comfort
Prioritizing projects that fill gaps in the bicycle
and pedestrian networks
High (2 points) or Medium (1 point)
Community
Support
Prioritizing locations with strong
public/stakeholder support
High (2 points) or Low/No (0 points)
Bonus: Activity Prioritizing locations that currently have high levels of bicycle and pedestrian activity
Yes (1) or No (0)
Road Extension and Bridge Realignment Projects
Feasibility Prioritizing projects that do not have significant feasibility challenges
Yes (2 points) or No (0 points)
Community
Support
Public/stakeholder support High (2 points) or Low/No (0 points)

Page 156 of 1051 ends

2 Bicycle and Pedestrian Project Prioritization Criteria The following methodology was developed for ranking bicycle facility and crossing improvement projects.

Access
This criterion scores projects based on how well they improve access to schools, parks, and community facilities.

Score
(Points)
Metric
High (2) Project is directly adjacent to a school, major park, or community center Medium (1) Project is located within walking distance (0.25 mi) of a school, major park, or community center Low (0) Project is not located within walking distance (0.25 mi) of school, major park, or community center Safety
Projects located near recent crash sites (per 2019-2024 crash data) may address key safety issues in St. Helena.

Score
(Points)
Metric
High (2)
Project located within 100’ of the site of:
• One fatal or severe bicycle or pedestrian crash; or
• Two or more bicycle or pedestrian crashes, regardless of severity Medium (1) Project located within 100’ of the site of one non-fatal/severe bicycle or pedestrian crash Low (0) No crashes occurred within 100’ of project site Connectivity
This criterion evaluates whether a project fills a gap in the network (and thus improves bicycle/pedestrian connectivity) or improves the quality of an existing bikeway or crossing. Projects that fill critical gaps in the network receive slightly more points than those that enhance existing infrastructure.

Score
(Points)
Metric
High (2) Project fills a gap in bicycle or pedestrian network (i.e. new bikeway where it does not currently exist or
Medium (1) Project enhances existing infrastructure
Community Support
Projects that address locations identified by community members as top priorities through public engagement receive two points, projects that received some support receive one point, and projects that received no community support receive 0 points. Project support will be quantified based on feedback received on the engagement boards presented to the St. Helena community during October 2024 engagement events.

Page 157 of 1051 ends

3 Score
(Points)
Metric
High (2) Project scored among top-priority projects
Medium (1) Project received some support, but didn’t rank among top priorities Low (0) Project received no support
Bonus Point: Activity
Bicyclist and pedestrian count data was collected at select locations throughout the city as part of this planning process. Projects within 100’ of a location with high relative pedestrian/bicyclist counts receive one bonus point as this demonstrates an area where improvements may benefit the most people. This criterion is only worth one point as it is limited only to the places where count data was collected.

Score
(Points)
Metric
Yes (1) Project within 100’ of location with relatively high bicyclist/pedestrian counts No (0) Project not within 100’ of location with relatively high bicyclist/pedestrian counts

Page 158 of 1051 ends

4 Roadway Extension and Bridge Realignment Project Prioritization Criteria The following methodology was developed for ranking road extension and bridge realignment projects.

Feasibility
Some of the road extension and bridge projects may require acquisition of privately owned land and therefore may not be realistic options for implementation. Projects that do not require the acquisition of private land receive 1 point.

It should be noted that ultimately all road/bridge projects will involve complexity and will have varying constraints, such as need for an EIR.

Community Support
Projects that address locations identified by community members as top priorities through public engagement receive two points, projects that received some support receive one point, and projects that received no community support receive 0 points. Project support will be quantified based on feedback received on the engagement boards presented to the St. Helena community during October 2024 engagement events.

Score
(Points)
Metric
High (2) Project scored among top-priority projects
Medium (1) Project received some support, but didn’t rank among top priorities Low (0) Project received no support
Score
(Points)
Metric
Yes (1) Project does not require acquisition of private land No (0) Project requires acquisition of private land

Page 159 of 1051 ends

Project Location Start End Access Safety
Connect/
Comfort
Community
Support Activity Total Proposed Facility
Sulphur Creek Trail Sulphur Springs Ave Napa River 2 1 2 2 7 Class I Shared-Use Path Napa River Trail City limit near WWTP City Limits (Deer Park Rd/Lower Reservoir Trl) 2 0 2 2 6 Class I Shared-Use Path S Crane Ave Grayson Ave Sulphur Springs Ave 2 0 2 1 1 6 Class II Bike Lanes Adams St Railroad Ave Allyn Ave 2 0 2 1 1 6 Class III Bike Boulevard Adams St extension Starr Ave Silverado Trl 2 1 2 1 6 TBD Crane Park Path (to La Quinta Way) Grayson Ave Kennedy Ct 2 0 2 1 5 Class I Shared-Use Path Library Lane Path Adams St Vine Trail (along RR corridor) 2 0 2 1 5 Class I Shared-Use Path College Ave Pope St Proposed class I @ SE end of College Ave 2 0 2 1 5 Class III Bike Boulevard McCorkle Ave Path McCorkle Ave cul-de-sac College Ave 2 0 2 0 4 Class I Shared-Use Path Pope St Starr Ave Silverado Trail 2 0 1 1 4 Class I Shared-Use Path Starr Ave Path extension Adams St Extension Mills Ln 1 0 2 1 4 Class I Shared-Use Path York Creek Path Spring Mountain Rd Vine Trail 1 0 2 1 4 Class I Shared-Use Path Grayson Ave Primary School driveway Highway 29 (Main St) 2 0 1 1 4 Class II Bike Lanes Madrona Ave- Riesling Way Main St Sylvaner Ave 1 0 2 1 4 Class II Bike Lanes Spring St White Sulphur Sp Rd at city limit Oak Ave 1 0 2 1 4 Class III Bike Boulevard Spring Mtn Rd Dean York Ln Madrona Ave 2 0 2 0 4 Class II Bike Lanes Elmhurst Ave Spring Mountain Rd Main St 2 0 2 0 4 Class III Bike Boulevard Edwards St Hunt Ave Pope St 1 0 2 1 4 Class III Bike Boulevard Hillview Pl Spring Mountain Rd Oak St 2 0 2 0 4 Class III Bike Boulevard Hunt Ave Church St Starr Ave 1 0 2 1 4 Class III Bike Boulevard Mitchell Dr Main St Crane Ave 1 0 2 1 4 Class III Bike Boulevard Valley View St Spring St Birch St 1 0 2 1 4 Class III Bike Boulevard Oak Ave extension to Grayson Mitchell Dr Grayson Ave 1 0 2 1 4 TBD Lower Reservoir Loop Trail NW city limit Loop Lower Reservoir + connect to Spring Mtn Rd 0 0 2 1 3 Class I Shared-Use Path Mills Ln Main St/SR 29 Proposed class I facility annex from Starr Ave 1 0 2 0 3 Class II Bike Lanes Allyn Ave Spring St Madrona Ave 0 0 2 1 3 Class II Bike Lanes Hudson Ave Madrona Ave Spring St 1 0 2 0 3 Class II Bike Lanes Birch Ave Crane Ave Valley View St 1 0 2 0 3 Class III Bike Boulevard Church St Hunt Ave Pope St 1 0 2 0 3 Class III Bike Boulevard Hunt Ave Railroad Ave Church St 1 0 2 0 3 Class III Bike Boulevard Mariposa Ln Pope St McCorkle Ave 1 0 2 0 3 Class III Bike Boulevard McCorkle Ave Alison Ave Proposed class I facility 675' west of College Ave 1 0 2 0 3 Class III Bike Boulevard N Crane Ave Spring St Birch St 1 0 2 0 3 Class III Bike Boulevard Oak Ave Hillview Pl Madrona Ave 1 0 2 0 3 Class III Bike Boulevard Railroad Ave Adams St Hunt Ave 1 0 2 0 3 Class III Bike Boulevard Railroad Ave Fulton Ln Hunt Ave 1 0 2 0 3 Class III Bike Boulevard College Ave extension to Mills Ln Terminus of College Ave Mills Ln 1 0 2 0 3 TBD Mills Ln extension to Silverado Trl Mills Ln Silverado Trl 1 0 2 0 3 TBD Pratt Ave Railroad Main St/SR 29 0 0 2 0 2 Class II Bike Lanes Sulphur Springs Rd S Crane Ave Main St/SR 29 0 0 2 0 2 Class II Bike Lanes Sylvaner Ave Riesling Way Spring St 0 0 2 0 2 Class II Bike Lanes Chaix Ln Main St/SR 29 Napa River Trail (proposed) 0 0 2 0 2 Class III Rural Bike Route Pratt Ave RR track/Vine Trail at Pratt Ave Napa River Trail (proposed) 0 0 2 0 2 Class III Rural Bike Route Spring Mountain Rd St Helena city limit (West) Dean York Ln 0 0 2 0 2 Class III Rural Bike Route Sulphur Springs Ave St Helena city limit Spring St 0 0 2 0 2 Class III Rural Bike Route Sulphur Springs Ave Sulphur Creek Crane Ave 0 0 2 0 2 Class III Rural Bike Route Allison Ave extension to Mills Ln Charter Oak Ave Mills Ln 0 0 2 0 2 TBD BUCKET

HIGH RANKING PROJECTS

MEDIUM HIGH RANKING PROJECTS

PROPOSED BIKE FACILITIES

Page 160 of 1051 ends

PROPOSED CROSSINGS
Intersection Access Safety
Connect/
Comfort
Community
Support Activity Total
Main St at Grayson Ave 2 1 1 2 6
Pope St at Allison Ave 1 1 1 2 5
Hillview Pl and Spring Mountain Rd^ 2 0 1 2 5
Main St at Crinella Ct^+ 1 0 1 2 4
Main St at Madrona Ave*^+ 1 1 1 1 4
Main St at Adams St+ 1 2 1 0 4
Main St at Spring St* 1 2 1 0 4
Pope St at Starr Ave 1 0 1 2 4
Hillview Pl at Middle School 2 0 1 0 1 4
Spring St at Hudson Ave 0 0 2 2 4
Grayson Ave at Crane Ave 2 0 1 1 4
Main St at Elmhurst Ave^+ 1 0 1 1 3
Main St at Pine St+ 2 0 1 0 3
Main St at Charter Oak Ave 0 1 1 1 3
Pope St at Mariposa Ln 2 0 1 0 3
Hunt Ave and Railroad Crossing 1 0 2 0 3
Hunt Ave at Edwards St 1 0 1 1 3
Madrona Ave and Oak Ave* 1 0 1 1 3
Madrona Ave at Stockton St 1 0 1 1 3
Madrona Ave at Allyn Ave* 0 0 2 1 3
Spring St at Oak Ave* 1 0 1 1 3
Spring St at Crane Ave* 0 0 2 1 3
Spring St and Valley View Ave 0 0 1 2 3
Spring Mountain Rd at Spring Mountain Ct 1 0 2 0 3
Spring Mountain Rd at Elmhurst Ave^ 1 0 1 1 3
Valley View Ave at Olive Ave 1 0 1 1 3
Main St at Pratt Ave+ 1 0 1 0 2
Main St at Hunt Ave^+ 1 0 1 0 2
Main St at Pope St 1 0 1 0 2
Main St at Mitchell Dr 1 0 1 0 2
Main St at 1000 Main 0 0 2 0 2
Pope St at Edwards St 1 0 1 0 2
Hunt Ave at Church St 1 0 1 0 2
Pine St and Oak Ave 1 0 1 0 2
Adams St at Stockton St 1 0 1 0 2
Adams St at Allyn Ave 1 0 1 0 2
Spring St at Kearney St* 1 0 1 0 2
Spring St at Stockton St 1 0 1 0 2
Hunt Ave and Starr Ave 0 0 1 0 1
Spring St at Allyn Ave 0 0 1 0 1
BUCKET

HIGH RANKING PROJECTS

MEDIUM HIGH RANKING PROJECTS

Page 161 of 1051 ends

PROPOSED ROADWAY EXTENSION + BRIDGE PROJECTS
Project Feasibility
Community
Support
Functional
Road
Classification
Total
Adams St extension to Silverado Trl 1 2 2 5
Pope St Bridge realignment 0 2 2 4
Oak Ave extension to Grayson Ave 0 2 2 4
Starr Ave extension north to Adams St 1 1 1 3
Mills Ln extension to Silverado Trl 0 1 2 3
Pratt Ave Bridge realignment 0 1 2 3
Starr Ave extension to Mills Ln 0 1 1 2
Allison Ave extension to Mills Ln 0 1 0 1
College Ave extension to Mills Ln 0 1 0 1
BUCKET

HIGH RANKING PROJECTS

MEDIUM HIGH RANKING PROJECTS

Page 162 of 1051 ends

METHODOLOGY
Prioritization Criterion Description Score
Access Project directly adjacent to school, park, or community facility 2 Project within 0.25 mi of school, park, or community facility 1 Safety Project located within 100’ of 1 fatal or severe bicycle or pedestrian crash; or 2+ bicycle or pedestrian crashes, regardless of severity 2 Project located within 100’ of the site of one non-fatal/severe bicycle or pedestrian crash 1 Connectivity and Comfort Project fills a gap in bicycle or pedestrian network (i.e. new bikeway where it does not currently exist or 2 Project enhances existing infrastructure 1
Project received some support, but didn’t rank among top priorities 1 Bikeway project within 100’ of location with relatively high bicyclist counts Pedestrian project within 100' of location with relatively high pedestrian counts Feasibility Projects without significant feasibility (i.e., will not require the taking of private property, or trigger environmental review) receive 2 points; otherwise, 0 points
2 Community Support Project scored among top-priority projects 2 Project received some support, but didn’t rank among top priorities 1 Functional Road
Classification Project will provide a new or realigned connection to an arterial road 2 Project will provide a new or realigned connection to a collector road 1 Project will provide a new or realigned connection to a local road 0 Road Extension and Bridge Realignment Projects
Community Support Project scored among top-priority projects Bicycle and Pedestrian Projects
2 Bonus: Activity 1

Page 163 of 1051 ends

St Helena Streets Master Plan
Appendix D
Network-wide Cost Opinions

Page 164 of 1051 ends

St. Helena SMP Proposed Bicycle Facilities-Cost Opinions Mar-26
Costs are based on 2024 Caltrans Cost data escalated to 2026 dollars. Bicycle Facilitiy cost opinions do not include costs related to design fees, environmental, drainage, and utility impacts.

Score Street/Trail Name Begins Ends Length
(Mi.) Low cost High cost
$ 580,000.00 $ 3,160,000.00
3 Allyn Ave Spring St Madrona Ave 0.34 $ 197,200.00 $ 1,074,400.00 6 S Crane Ave Grayson Ave Sulphur Springs Ave 0.45 $ 261,000.00 $ 1,422,000.00 4 Grayson Ave Primary School driveway Highway 29 (Main St) 0.50 $ 290,000.00 $ 1,580,000.00 3 Hudson Ave Madrona Ave Spring St 0.32 $ 185,600.00 $ 1,011,200.00 3 Mills Ln Main St/SR 29 Proposed class I facility annex from Starr Ave 0.50 $ 290,000.00 $ 1,580,000.00 4 Spring Mtn Rd Dean York Ln Madrona Ave 0.39 $ 226,200.00 $ 1,232,400.00 2 Sulphur Springs Rd S Crane Ave Main St/SR 29 0.50 $ 290,000.00 $ 1,580,000.00 2 Sylvaner Ave Riesling Way Spring St 0.30 $ 174,000.00 $ 948,000.00 $ 780,000.00 $ 1,800,000.00
6 Adams St Railroad Ave Allyn Ave 0.47 $ 366,600.00 $ 846,000.00 3 Birch Ave Crane Ave Valley View St 0.15 $ 117,000.00 $ 270,000.00 3 Church St Hunt Ave Pope St 0.13 $ 101,400.00 $ 234,000.00 5 College Ave Pope St Proposed class I facility at SE end of College Ave 0.18 $ 140,400.00 $ 324,000.00 4 Elmhurst Ave Spring Mountain Rd Main St 0.23 $ 179,400.00 $ 414,000.00 4 Edwards St Hunt Ave Pope St 0.15 $ 117,000.00 $ 270,000.00 4 Hillview Pl Spring Mountain Rd Oak St 0.14 $ 109,200.00 $ 252,000.00 3 Hunt Ave Railroad Ave Church St 0.02 $ 15,600.00 $ 36,000.00 4 Hunt Ave Church St Starr Ave 0.42 $ 327,600.00 $ 756,000.00 4 Madrona Ave- Riesling Way Main Street Sylvaner Ave 1.03 $ 803,400.00 $ 1,854,000.00 3 Mariposa Ln Pope St McCorkle Ave 0.14 $ 109,200.00 $ 252,000.00 3 McCorkle Ave Alison Ave Proposed class I facility 675' west of College Ave 0.29 $ 226,200.00 $ 522,000.00 4 Mitchell Dr Main St Crane Ave 0.44 $ 343,200.00 $ 792,000.00 3 N Crane Ave Spring St Birch St 0.23 $ 179,400.00 $ 414,000.00 3 Oak Ave Hillview Pl Madrona Ave 0.10 $ 78,000.00 $ 180,000.00 3 Railroad Ave Adams St Hunt Ave 0.11 $ 85,800.00 $ 198,000.00 3 Railroad Ave Fulton Ln Hunt Ave 0.21 $ 163,800.00 $ 378,000.00 4 Spring St Sylvaner Ave White Sulphur Spring Rd 0.18 $ 140,400.00 $ 324,000.00 4 Valley View St Spring St Birch St 0.20 $ 156,000.00 $ 360,000.00 4 Spring St Valley View St Oak Ave 0.56
Vine Trail Fulton Ln (begins) Main St/SR 29 (ends) 0.72 N/A N/A 2 Chaix Ln Main St/SR 29 Napa River Trail (proposed) 1.07 2 Pratt Ave Main St/SR 29 Napa River Trail (proposed) 0.71 2 Spring Mountain Rd St Helena city limit (West) Dean York Ln 0.69 2 Sulphur Springs Ave St Helena city limit Spring St 0.16 2 Sulphur Springs Ave Sulphur Creek Crane Ave 0.93
$ 7,220,000.00 $ 7,220,000.00
The primary data source for the bicycle projects listed below was the 2019 NVTA Countywide Bicycle Plan. Limited refinements have been incorporated to reflect more recent planning efforts, including updates to the Sulphur Creek Class I Trail extents consistent with the General Plan Update 2040 Bike Network exhibit, the reclassification of Madrona from a Class II to a Class III facility, and other minor adjustments.Facilities previously proposed for Main Street/Highway 29 prior to the implementation of the Vine Trail (including Class II and Class III facilities) have been excluded from the list below; furthermore, any facilities proposed for Main Street will require coordination with the Downtown Specific Plan.

Class I Shared-Use Path
$ 300,000.00
$ 321,000.00
$ 213,000.00
$ 207,000.00
$ 48,000.00
$ 279,000.00
Cost opinion
Class II Bike Lanes
Class III Bike Boulevard
Class III Rural Bike Route
$ 3,129,120.00

Page 165 of 1051 ends

5 Crane Park Path (to La Quinta Way) Grayson Ave Sulphur Springs Ave 0.50 $ 3,610,000.00 N/A 5 Library Lane Path Adams St Vine Trail (along RR corridor) 0.13 $ 938,600.00 N/A 3 Lower Reservoir Loop Trail NW city limit Loop around Lower Reservoir to connect to Spring Mountain Rd 1.25 $ 9,025,000.00 N/A
4 McCorkle Ave Path McCorkle Ave cul-de-sac College Ave 0.14 $ 1,010,800.00 N/A high cost 6 Napa River Trail St Helena city limit near
wastewater treatment plant St Helena city limit (Deer Park Rd / Lower Reservoir Trail) 3.04 N/A $ 21,948,800.00 4 Pope St Starr Ave Silverado Trail 0.41 $ 2,960,200.00 N/A Vine Trail (Pratt Ave) RR Main St/SR 29 0.26 N/A N/A
Vine Trail (Railroad) Pratt Ave Fulton Ln 0.33 N/A N/A
4 Starr Ave Path Adams Ave (pending future
extension) Mills Ln 0.84 $ 6,064,800.00 N/A
high cost 7 Sulphur Creek Trail Sulphur Springs Ave Napa River 2.19 N/A $ 15,811,800.00 Vine Trail (excluding Class III segment,
above) St Helena City Limits (South) St Helena City Limits (North) 2.44 N/A N/A 4 York Creek Path Spring Mountain Rd Main St (Vine Trail) 0.33 $ 2,382,600.00 N/A 6 Adams St (pending future extension) Railroad Ave Silverado Trail 0.84 2 Allison Avenue (pending future extension) Charter Oak Ave Mills Ln 0.21 N/A N/A 3 College Ave (pending future extension) McCorkle Ave Path Mills Ln 0.24 N/A N/A Main St Pratt Ave Mitchell Dr 0.76 N/A N/A
3 Mills Ln (pending future extension) Starr Ave Silverado Trail 0.51 N/A N/A 4 Oak Ave (pending future extension) Mitchell Dr Grayson Ave 0.42 N/A N/A Facility Type to Be Determined
See separate cost opinion

Page 166 of 1051 ends

St. Helena SMP Proposed Crossing Improvements
Mar-26
Costs are based on 2024 Caltrans Cost data escalated to 2026 dollars. Crossing improvement cost opinions do not include costs related to design fees, environmental, drainage, and utility impacts.

Score Intersection Existing Conditions Proposed Improvements Item Quantity Itemized Cost Subtotal Cost (2024 dollars)
Construction
Contingency
Escalation
Years Escalation Total Cost (2026 dollars)
2 Main St at Pratt Ave+
High-visibility crosswalk on south approach; high-visibility crosswalk and stop sign on minor approach; curb ramps
have detectable warning surfaces
Install high-visibility crosswalk on north approach High-visibility crosswalk 1 $ 3,000 $ 3,000 20% 2 7% $ 4,200 High-visibility crosswalk 3 $ 9,000
Signs 4 $ 1,480
RRFB 1 $ 15,000
Signs 4 $ 1,480
High-visibility crosswalk 4 $ 12,000
Curb extensions 4 $ 21,600
Curb ramps 8 $ 12,000
High-visibility crosswalk 4 $ 12,000
Curb ramps 8 $ 12,000
RRFB 1 $ 15,000
High-visibility crosswalk 4 $ 12,000
Curb ramps 8 $ 12,000
Curb extensions 4 $ 21,600
High-visibility crosswalk 3 $ 9,000
Curb ramps 6 $ 9,000
Curb extensions 4 $ 21,600
RRFB 3 $ 45,000
Curb extensions 4 $ 21,600
Curb ramps 6 $ 9,000
High-visibility crosswalk 3 $ 9,000
Curb ramps 6 $ 9,000
Curb extensions 4 $ 21,600
High-visibility crosswalk 3 $ 9,000
Curb ramps 6 $ 9,000
Curb extensions 4 $ 21,600
2 Main St at 1000 Main+ Currently no crossing here Consider installing a crossing to improve pedestrian connectivity, reduce block lengths, and slow speeds. High-visibility crosswalk 1 $ 3,000 $ 3,000 20% 2 7% $ 4,200 20% 2 7% $ 54,500
7% $ 54,500
20% 2 7% $ 103,900
20% 2 7% $ 54,500
20% 2 7% $ 14,400
20% 2 7% $ 22,700
20% 2 7% $ 62,700
20% 2 7% $ 53,600
20% 2 7% $ 62,700
20% 2
$ 45,600
$ 39,000
$ 45,600
$ 39,600
$ 75,600
$ 39,600
$ 39,600
$ 10,480
$ 16,480
Signalized intersection; standard crosswalk on minor
approach only; curb ramps not ADA-compliant
Ensure high-visibility crosswalks on all approaches
(note that north approach of this intersection is
south approach of SR29/Pope St intersection); install
3 Main St at Elmhurst
Ave^+
Standard crosswalk on south approach; standard
crosswalk and stop-sign on minor approach; “slight” curb extensions; curb ramps have detectable warning surfaces; RRFB.

Ensure high-visibility crosswalks on all approaches
and advanced warning sign for RRFB
4 Main St at Crinella
Ct^+
High-visibility crosswalk on all approaches; stop sign on minor approach; curb ramps have detectable warning
surfaces
Install RRFB with advanced warning signs on either
north or south approach
Install curb extensions and RRFB on southeast
approach; upgrade all curb ramps to be ADAcompliant
High-visibility crosswalk and stop sign or minor approach; high-visibility crosswalk on southeast approach; curb
ramps not ADA-compliant
4 Main St at Spring St*+
Upgrade all crosswalks to high-visibility; upgrade
curb ramps to be ADA-compliant; install curb
extensions on both sides of Main St crossings
Signalized intersection; standard crosswalks; curb ramps not ADA-compliant 4 Main St at Adams St+
Install high-visibility crosswalk on north approach;
upgrade curb ramps to be ADA-compliant; install
curb extensions on all approaches
High-visibility crosswalk and stop sign on minor approach; high-visibility crosswalk on south approach; curb ramps not ADA-compliant
2 Main St at Hunt Ave^+
4 Main St at Madrona
Ave*^+
Signalized intersection; standard crosswalks; curb ramps not ADA-compliant
Upgrade all crosswalks to high-visibility; upgrade
curb ramps to be ADA-compliant; install curb
extensions
3 Main St at Pine St+
Standard crosswalks on all approaches except north; stop signs on minor approaches; curb ramps not ADAcompliant Ensure high-visibility crosswalks on all approaches;
upgrade curb ramps to be ADA-compliant; install
RRFB on either north or south approach
2 Main St at Pope St+ Signalized intersection; standard crosswalks on all approaches except south; curb ramps not ADA-compliant
Ensure high-visibility crosswalks on all approaches;
upgrade curb ramps to be ADA-compliant; install
curb extensions on both sides of Main St crossings
2 Main St at Mitchell Dr+

Page 167 of 1051 ends

High-visibility crosswalk 3 $ 9,000
Curb ramps 4 $ 6,000
RRFB 1 $ 15,000
6 Main St at Grayson Ave
Signalized intersection; standard crosswalk on minor
approach (no sidewalk/train tracks only on east side of street); curb ramps have detectable warning surfaces
Upgrade crosswalk to high visibility High-visibility crosswalk 1 $ 3,000 $ 3,000 20% 2 7% $ 4,200 5 Pope St at Allison Ave
Stop-controlled crossing on minor approach (across
Allison Ave) with high-visibility crosswalk with ADAcompliant ramps; no crossing across Pope St because there no sidewalk on north side and limited visibility at curve makes crossing dangerous.

Crossing cannot be installed here due to limited
visibility and ROW constraints. Install speed
reduction treatments on both approaches of Pope St
at Allison Ave. Consider vegetation management to
improve visibility.

Speed hump 2 $ 14,000 $ 14,000 20% 2 7% $ 19,300
3 Pope St at Mariposa Ln Stop control and standard crosswalk on minor approach; high-visibility crosswalk on southwest approach Install RRFB (Jacob Meily Park access) RRFB 1 $ 15,000 $ 15,000 20% 2 7% $ 20,700 High-visibility crosswalk 3 $ 9,000
Curb ramps 6 $ 9,000
High-visibility crosswalk 1 $ 3,000
Curb ramps 6 $ 9,000
High-visibility crosswalk 4 $ 12,000
Segmental Divider 20 $ 1,600
High-visibility crosswalk 3 $ 9,000
Curb ramps 6 $ 9,000
High-visibility crosswalk 3 $ 9,000
Signs 1 $ 370
Curb ramps 6 $ 9,000
2 Hunt Ave at Church St
High-visibility crosswalk and stop sign on Railroad Ave approach; stop sign with no crosswalk at Church St
approach; curb ramps have detectable warning surfaces
Install high-visibility crosswalk at Church St, just
east of the railroad tracks; upgrade Church
crosswalk to high-visibility
High-visibility crosswalk 2 $ 6,000 $ 6,000 20% 2 7% $ 8,300 High-visibility crosswalk 1 $ 3,000
Curb ramps 2 $ 3,000
Curb extensions 2 $ 10,800
RRFB 1 $ 15,000
Signs 8 $ 2,960
Curb extensions 4 $ 21,600
High-visibility crosswalk 4 $ 12,000
Curb ramps 8 $ 12,000
High-visibility crosswalk 4 $ 12,000
Curb ramps 8 $ 12,000
Curb extensions 4 $ 21,600
20% 2 7% $ 62,700
20% 2 7% $ 25,300
20% 2 7% $ 43,700
20% 2 7% $ 66,800
20% 2 7% $ 16,500
20% 2 7% $ 18,700
20% 2 7% $ 24,800
20% 2 7% $ 41,300
20% 2 7% $ 24,800
$ 30,000
$ 18,000
$ 12,000
$ 13,600
$ 18,000
$ 18,370
$ 31,800
$ 45,600
$ 48,560
3 Madrona Ave and Oak
Ave*
All-way stop control with standard crosswalks;
noncompliant curb ramps
Upgrade crosswalks to be high-visibility and upgrade
curb ramps to ADA-compliant; extend red curb to
daylight the intersection; install curb extensions on
all corners
4 Hillview Pl at Middle
School Standard crosswalk; one ramp not ADA-compliant Upgrade to high-visibility crosswalk and upgrade ramp to be ADA-compliant; install RRFB
5 Hillview Pl and Spring
Mountain Rd^
Stop control on minor approaches; standard crosswalks;
curb ramps not ADA-compliant
Install stop-control on all approaches and curb
extensions on all corners, upgrade all crosswalks to
high visibility, and upgrade all curb ramps to be ADAcompliant 3 Main St at Charter Oak
Ave+
High-visibility crossing with RRFB on north approach; stop control on minor approaches with standard crosswalk on
west approach and no crosswalk on east approach; most
curb ramps not ADA-compliant
Ensure high-visibility crosswalks on all approaches
and upgrade curb ramps to be ADA-compliant.

Modernize RRFB and/or install PHB (PHB already in
City’s CIP and dependent on private development
funding)
Stop-controlled on all legs; no crosswalks; curb ramps
missing and existing one is noncompliant
Install high-visibility crosswalks at both stop signs
and ensure ADA-compliant curb ramps are present
at all crossings
3 Hunt Ave at Edwards St
High-visibility crosswalk on west and south approaches; stop sign on south (minor) approach; curb ramps have detectable warning surfaces Install high-visibility crosswalk on east approach 3 Hunt Ave and Railroad
Crossing Not ADA-compliant; poor visibility
Upgrade crossing to be ADA-compliant. Add vertical
delineation or otherformalized separation on west side of railroad tracks between tracks and Railroad Avenue to
shorten crosswalk across the parking spaces. Remove the two parking stalls immediately adjacent to the crosswalk to improve pedestrian visibility.
1 Hunt Ave and Starr Ave
2 16. Pope St at Edwards
St
High-visibility crosswalk on north approach across
Edwards; stop-controlled crossing on minor approach (no crosswalk); ramps not ADA-compliant
Install high-visibility crosswalk on minor approach
and upgrade ramps to be ADA-compliant. If crossing
is not installed at Allison Ave, consider installing
RRFB at this location instead.
4 Pope St at Starr Ave
High-visibility crosswalks on major approaches; standard crosswalk on minor approach; RRFB on west approach;
one curb ramp not ADA-compliant
Ensure all crosswalks are high-visibility and that all
curb ramps are ADA-compliant

Page 168 of 1051 ends

High-visibility crosswalk 4 $ 12,000
Curb ramps 8 $ 12,000
3 Madrona Ave at Allyn
Ave*
No crosswalks; stop control on minor approach; curb
ramps have detectable warning surfaces
Install high-visibility crosswalk on minor approach
and across the SW approach on Madrona Ave High-visibility crosswalk 3 $ 9,000 $ 9,000 20% 2 7% $ 12,400 High-visibility crosswalk 4 $ 12,000
Curb ramps 8 $ 12,000
High-visibility crosswalk 4 $ 12,000
Curb ramps 8 $ 12,000
2 Adams St at Allyn Ave All-way stop control with no crosswalks; curb ramps have detectable warning surfaces Upgrade crosswalks to be high visibility High-visibility crosswalk 4 $ 12,000 $ 12,000 20% 2 7% $ 16,500 High-visibility crosswalk 3 $ 9,000
Curb ramps 6 $ 9,000
High-visibility crosswalk 3 $ 9,000
Curb ramps 6 $ 9,000
4 Grayson Ave at Crane
Ave
All-way stop control; high-visibility crosswalk across
Grayson Ave; curb ramps have detectable warning
surfaces
None – there are currently no sidewalks on the rural
side of Crane Ave $ - 20% 2 7% $ -
3 Valley View Ave at
Olive Ave
Stop control on minor approach; standard crosswalks on
minor approach and across SE approach of Valley View
Ave; curb ramps have detectable warning surfaces
Upgrade crosswalks to high visibility High-visibility crosswalk 3 $ 9,000 $ 9,000 20% 2 7% $ 12,400 Pope St at Paseo
Grand Drive
High-visibility crosswalks on all approaches except
vineyard entrance (standard crosswalk); RRFB on north
approach; stop control on minor approaches; curb ramps
have detectable warning surfaces
None NO COST OPINION NEEDED
Adams St at Oak Ave All-way stop control with high-visibility crosswalks and curb ramps with detectable warning surfaces None NO COST OPINION NEEDED Madrona Ave and
Kearney St
Stop control on minor approaches, high visibility
crosswalks, curb extensions; curb ramps have detectable warning surfaces
None NO COST OPINION NEEDED
Adams St at Kearney St All-way stop control with high-visibility crosswalks; ADAcompliant curb ramps None NO COST OPINION NEEDED Hillview Pl at Kearney
St
High-visibility crosswalks; stop control on minor
approach; curb ramps have detectable warning surfaces
None; however curb extensions may be considered
pending configuration study. NO COST OPINION NEEDED
Grayson Ave at High
School Entrance
High-visibility crosswalk and RRFB; curb ramps have
detectable warning surfaces None NO COST OPINION NEEDED 3 Spring St and Valley
View Ave
Stop control and standard crosswalk on minor approach;
high-visibility crosswalk on NE approach and noncompliant ramp on Spring St Install RRFB on NE approach and upgrade curb ramp
to be ADA-compliant; upgrade standard crosswalk to
high visibility

NO COST OPINION NEEDED
4 Spring St at Hudson Stop control on minor approach; missing curb ramps; no Install high-visibility crosswalks on minor approach NO COST OPINION NEEDED 1 Spring St at Allyn Ave Stop control and high-visibility crosswalk on minor approach; curb ramps have detectable warning surfaces Install high-visibility crosswalk on NE approach NO COST OPINION NEEDED 3 Spring St at Crane Ave* Stop control and no crosswalk on minor approach; non- Upgrade curb ramp to be ADA-compliant. Install high- NO COST OPINION NEEDED 2 Spring St at Stockton St Stop control and high-visibility crosswalk on minor approach; curb ramps have detectable warning surfaces Install high-visibility crosswalk on NE approach NO COST OPINION NEEDED 2 Spring St at Kearney
St*
Stop control and high-visibility crosswalk on minor
approach; high-visibility crosswalk on NE approach; two ramps are not ADA-compliant and one does not exist
Install ADA-compliant ramps at all crossings NO COST OPINION NEEDED 3 Spring St at Oak Ave* All-way stop control with standard crosswalks on three of Ensure high-visibility crosswalks exist on all NO COST OPINION NEEDED 20% 2 7% $ 33,000
20% 2 7% $ 24,800
20% 2 7% $ 24,800
20% 2 7% $ 33,000
20% 2 7% $ 33,000
All-way stop control with standard crosswalks; curb ramps either non-compliant or missing
Upgrade crosswalks to be high-visibility and upgrade
curb ramps to ADA-compliant
$ 18,000
$ 18,000
$ 24,000
$ 24,000
$ 24,000
3 Spring Mountain Rd at
Elmhurst Ave^
Stop control and standard crosswalk on minor approach
and high-visibility crosswalk on southeast approach; all curb ramps either missing or non-compliant
Install high-visibility crosswalk on minor approach,
ADA-compliant curb ramps, and curb extensions
3 Spring Mountain Rd at
Spring Mountain Ct
Three-legged intersection with stop control on two of the approaches; no crosswalks nor curb ramps present
Install high-visibility crosswalk and ADA-compliant
curb ramps on east approach.
2 Pine St and Oak Ave All-way stop control with standard crosswalks; noncompliant curb ramps
Upgrade crosswalks to be high-visibility and upgrade
curb ramps to ADA-compliant
2 Adams St at Stockton
St
3 Madrona Ave at
Stockton St
No crosswalks; stop control on minor approach; one curb ramp not ADA-compliant
Install high-visibility crosswalk on minor approach
and across the NE approach on Madrona Ave; ensure
all curb ramps are ADA-compliant
Crossings that are included in the Spring St concept cost opinion Crossings that were reviewed and that do not need improvements

Page 169 of 1051 ends

PER MILE COSTS BY

BICYCLE FACILITY CLASSIFICATION
The following pages provide backup documentation for the calculation of per-mile costs by bicycle facility type. These unit costs were used to develop planning-level estimates for each discrete proposed bicycle facility. For every recommended segment, the appropriate facility type, and corresponding low- or high-cost treatment, was assigned and then multiplied by the relevant per-mile cost to generate a segment-level estimate.

Page 170 of 1051 ends

City of St Helena Streets Master Plan
Per Mile Cost Opinion
Mar-26
Table 1: Planning-Level Per-Mile Costs
Low Cost High Cost Low Cost Description High Cost Description Class I $ 7,220,000 $ 7,220,000
Replace existing 5' sidewalk to 12'
shared use path + 5' physical barrier
along curb line
Class I next to river or creek
Class II $ 580,000 $ 3,160,000 Eradicate existing markings and stripe bike lanes
Resurface street and stripe bike
lanes
Class III - Bike Boulevard $ 780,000 $ 1,800,000
Shared lane pavement markings and
signage. Only speed humps, signing and
striping
Shared lane pavement markings and
signage. Speed humps, signing,
striping, and traffic circles every third
intersection
Class III - Rural Bike Route $ 300,000 Shared lane pavement markings and signage Facility Type
Rounded Per Mile Cost Estimate
(Presented in 2026 dollars)
Table 1 shows planning-level bikeway per mile cost estimates. Cost estimates are based on the unit cost and soft cost values provided in the Master Unit & Soft Costs tab (based primarily on available Caltrans 2024 data).

Refer to the following tabs for detailed assumptions for each facility type This cost opinion was developed in October 2025 and the ENR Construction Cost index is 15,459 This cost opinion was developed in October 2025. The latest National Highway Construction Cost index for Q1 2025 is 3.167

Page 171 of 1051 ends

Assumptions
Continuous raised path on one side, 2 intersections each end 2 intersections bike lane symbol every 250' x2 for two way
Roadway section 4 lanes
Street curb to curb width 56 ft
Average side street width 56 ft
Width of shared use path 12 ft
Pavement depth 6 inches
Pavement material Hot Mix Asphalt (Type A)
14' wide crosswalks, 24" lines, 5' spacing 313.6 sf
Unidirectional curb ramps per intersection 8 ramps
2 D11-1 signs per intersection
Total Class I length 5280 ft
CALTRANS ITEM DESRIPTION ITEM NOTES UNIT UNIT COST (2024) QUANTITY TOTAL COST DEMOLITION INCLUDES EXCAVATION, ALL CONCRETE REMOVAL, AND REPROFCY $ 240.00 3324.44 $ 797,866.67 INSTALL CONCRETE K-RAIL LF $ 65.00 5280.00 $ 343,200.00 HOT MIX ASPHALT (TYPE A) 0 TON $ 220.00 2370.13 $ 521,429.33 REMOVE THERMOPLASTIC TRAFFIC STRIPE REMOVE EXISTING THERMOPLASTIC TRAFFIC STRIPE LF $ 3.00 26400.00 $ 79,200.00 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN YELLOW) 6" BROKEN YELLOW LF $ 4.00 5280.00 $ 21,120.00 6" THERMOPLASTIC TRAFFIC STRIPE (DETAIL 28) DETAIL 28 (6" SOLID DOUBLE YELLOW LINES) LF $ 5.00 5280.00 $ 26,400.00 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 17-7) DETAIL 8 (6" BROKEN WHITE LINE) LF $ 4.00 10560.00 $ 42,240.00 6" THERMOPLASTIC TRAFFIC STRIPE (DETAIL 39) DETAIL 39 (6" SOLID WHITE LINE) LF $ 4.00 10560.00 $ 42,240.00 GREEN THERMOPLASTIC PAINT CONFLICT MARKINGS SQFT $ 19.50 1344.00 $ 26,208.00 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 8-4) DETAIL 39A (6"BROKEN WHITE LINE) LF $ 4.00 896.00 $ 3,584.00 THERMOPLASTIC CROSSWALK AND PAVEMENT MARKING HIGH VISIBILITY CROSSWALK SQFT $ 20.00 2509 $ 50,176.00 MINOR CONCRETE (CURB RAMP) ASSUMING 1 CY PER UNIDIRECTIONAL CURB RAMP CY $ 1,500.00 16.00 $ 24,000.00 MINOR CONCRETE (CURB AND GUTTER) LF $ 160.00 5280.00 $ 844,800.00 LANDSCAPE SF $ 15.00 26400.00 $ 396,000.00
Material Cost Subtotal $ 3,218,464.00
Mobilization 5% $ 160,923.20
Traffic Control 5% $ 160,923.20
Construction Cost Contingency 20% $ 643,692.80
Utility Contingency 5% $ 160,923.20
Drainage Contingency 5% $ 160,923.20
Environmental Contingency 5% $ 160,923.20
Subtotal $ 1,448,308.80
Construction Cost Subtotal $ 4,666,772.80
Engineering and Design Costs 15% $ 700,015.92
Construction Management 20% $ 933,354.56
Subtotal $ 1,633,370.48
Total Cost/Mile (2024 dollars) $ 6,300,143.28
Total Cost/Mile (2026 dollars) Years: 2 7% $ 7,213,034.04 Rounded Cost/Mile $ 7,220,000.00
Actual costs may vary based on project scope and current market conditions.

Caltrans maintains historical cost indices and forecast at:

Class I
Unit prices per recent Bid Items on Caltrans Contract Cost Data.

All costs adjusted to 2026 dollars.

Replace existing 5' sidewalk to 12' shared use path + 5' physical barrier along curb line

Page 172 of 1051 ends

Assumptions
Continuous raised path, 2 intersections each end 2 intersections bike lane symbol every 250' x2 for two way
Roadway section 4 lanes
Street curb to curb width 56 ft
Average side street width 56 ft
Width of shared use path 12 ft
Pavement depth 6 inches
Pavement material Hot Mix Asphalt (Type A)
14' wide crosswalks, 24" lines, 5' spacing 313.6 sf
Unidirectional curb ramps per intersection 8 ramps
2 D11-1 signs per intersection
Total Class I length 5280 ft
CALTRANS ITEM DESRIPTION ITEM NOTES UNIT UNIT COST (2024) QUANTITY TOTAL COST DEMOLITION INCLUDES EXCAVATION, ALL CONCRETE REMOVAL, AND REPROFCY $ 240.00 3324.44 $ 797,866.67 INSTALL CONCRETE K-RAIL LF $ 65.00 5280.00 $ 343,200.00 HOT MIX ASPHALT (TYPE A) 0 TON $ 220.00 2370.13 $ 521,429.33 REMOVE THERMOPLASTIC TRAFFIC STRIPE REMOVE EXISTING THERMOPLASTIC TRAFFIC STRIPE LF $ 3.00 26400.00 $ 79,200.00 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN YELLOW) 6" BROKEN YELLOW LF $ 4.00 5280.00 $ 21,120.00 6" THERMOPLASTIC TRAFFIC STRIPE (DETAIL 28) DETAIL 28 (6" SOLID DOUBLE YELLOW LINES) LF $ 5.00 5280.00 $ 26,400.00 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 17-7) DETAIL 8 (6" BROKEN WHITE LINE) LF $ 4.00 10560.00 $ 42,240.00 6" THERMOPLASTIC TRAFFIC STRIPE (DETAIL 39) DETAIL 39 (6" SOLID WHITE LINE) LF $ 4.00 10560.00 $ 42,240.00 GREEN THERMOPLASTIC PAINT CONFLICT MARKINGS SQFT $ 19.50 1344.00 $ 26,208.00 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 8-4) DETAIL 39A (6"BROKEN WHITE LINE) LF $ 4.00 896.00 $ 3,584.00 THERMOPLASTIC CROSSWALK AND PAVEMENT MARKING HIGH VISIBILITY CROSSWALK SQFT $ 20.00 2509 $ 50,176.00 MINOR CONCRETE (CURB RAMP) ASSUMING 1 CY PER UNIDIRECTIONAL CURB RAMP CY $ 1,500.00 16.00 $ 24,000.00 MINOR CONCRETE (CURB AND GUTTER) LF $ 160.00 5280.00 $ 844,800.00 LANDSCAPE SF $ 15.00 26400.00 $ 396,000.00

0.00 $ -

0.00 $ -

0.00 $ -

0.00 $ -

0.00 $ -

0.00 $ -

0.00 $ -

0.00 $ -
Material Cost Subtotal $ 3,218,464.00
Mobilization 5% $ 160,923.20
Traffic Control 5% $ 160,923.20
Construction Cost Contingency 20% $ 643,692.80
Utility Contingency 5% $ 160,923.20
Drainage Contingency 5% $ 160,923.20
Environmental Contingency 5% $ 160,923.20
Subtotal $ 1,448,308.80
Construction Cost Subtotal $ 4,666,772.80
Engineering and Design Costs 15% $ 700,015.92
Construction Management 20% $ 933,354.56
Subtotal $ 1,633,370.48
Total Cost/Mile (2024 dollars) $ 6,300,143.28
Total Cost/Mile (2026 dollars) Years: 2 7% $ 7,213,034.04 Rounded Cost/Mile $ 7,220,000.00
Actual costs may vary based on project scope and current market conditions.

Caltrans maintains historical cost indices and forecast at:

Class I
Unit prices per recent Bid Items on Caltrans Contract Cost Data.

All costs adjusted to 2026 dollars.

Class I next to river or creek

Page 173 of 1051 ends

Assumptions
1mile = 5280 ft
Average block distance 400 ft
Estimated total intersections in 1 mile: 13 intersections all-way stop intersections in 1 mile 4 intersections
Signalized intersections in 1 mile 1 intersection
Bike lane markings 4 at each intersection
Street curb to curb width 40 ft
Average side street width 40 ft
10' wide crosswalks, 24" lines, 5' spacing 160 sf
Width of bike lane 6 ft
R81A signs per intersection 2
One travel lane and one bike lane each direction
CALTRANS ITEM DESRIPTION ITEM NOTES UNIT UNIT COST (2024) QUANTITY TOTAL COST ROADSIDE SIGN - ONE POST R81A (BIKE LANE) EA $ 500.00 26 $ 13,200.00 REMOVE THERMOPLASTIC TRAFFIC STRIPE REMOVE EXISTING THERMOPLASTIC TRAFFIC STRIPE LF $ 3.00 4752 $ 14,256.00 6" THERMOPLASTIC TRAFFIC STRIPE (DETAIL 28) DETAIL 28 (6" SOLID DOUBLE YELLOW LINES) LF $ 5.00 4752 $ 23,760.00 6" THERMOPLASTIC TRAFFIC STRIPE (DETAIL 39) DETAIL 39 (6" SOLID WHITE LINE) LF $ 4.00 9504 $ 38,016.00 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 8-4) DETAIL 39A (6"BROKEN WHITE LINE) LF $ 4.00 2112 $ 8,448.00 THERMOPLASTIC PAVEMENT MARKING BIKE LANE MARKING SQFT $ 15.00 1230 $ 18,453.60 THERMOPLASTIC CROSSWALK AND PAVEMENT MARKING HIGH VISIBILITY CROSSWALK SQFT $ 20.00 3755 $ 75,093.33 12" THERMOPLASTIC TRAFFIC STRIPE LIMIT LINE (12"SOLID WHITE LINE) LF $ 4.00 469 $ 1,877.33 GREEN THERMOPLASTIC PAINT CONFLICT MARKINGS SQFT $ 19.50 3168 $ 61,776.00 $ -
$ -
Material Cost Subtotal $ 254,880.27
Mobilization 5% $ 12,744.01
Traffic Control 5% $ 12,744.01
Construction Cost Contingency 20% $ 50,976.05
Utility Contingency 5% $ 12,744.01
Drainage Contingency 5% $ 12,744.01
Environmental Contingency 5% $ 12,744.01
Subtotal $ 114,696.12
Construction Cost Subtotal $ 369,576.39
Engineering and Design Costs 15% $ 55,436.46
Construction Management 20% $ 73,915.28
Subtotal $ 129,351.74
Total Cost/Mile (2024 dollars) $ 498,928.12
Total Cost/Mile (2026 dollars) Years: 2 7% $ 571,222.81 Rounded Cost/Mile $ 580,000.00
Actual costs may vary based on project scope and current market conditions.

Caltrans maintains historical cost indices and forecast at:

Class II
Unit prices per recent Bid Items on Caltrans Contract Cost Data.

All costs adjusted to 2026 dollars.

Eradicate existing markings and stripe bike lanes

Page 174 of 1051 ends

Assumptions
1mile = 5280 ft
Average block distance 400 ft
Estimated total intersections in 1 mile: 13 intersections all-way stop intersections in 1 mile 4 intersections
Signalized intersections in 1 mile 1 intersection
Bike lane markings 4 at each intersection
Street curb to curb width 40 ft
Average side street width 40 ft
10' wide crosswalks, 24" lines, 5' spacing 160 sf
Width of bike lane 6 ft
R81A signs per intersection 2
One travel lane and one bike lane each direction
CALTRANS ITEM DESRIPTION ITEM NOTES UNIT UNIT COST (2024) QUANTITY TOTAL COST ROADSIDE SIGN - ONE POST R81A (BIKE LANE) EA $ 500.00 26 $ 13,200.00 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD $ 25.00 23467 $ 586,666.67 HOT MIX ASPHALT (TYPE A) 0 TON $ 220.00 2640 $ 580,800.00 6" THERMOPLASTIC TRAFFIC STRIPE (DETAIL 28) DETAIL 28 (6" SOLID DOUBLE YELLOW LINES) LF $ 5.00 4752 $ 23,760.00 6" THERMOPLASTIC TRAFFIC STRIPE (DETAIL 39) DETAIL 39 (6" SOLID WHITE LINE) LF $ 4.00 9504 $ 38,016.00 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 8-4) DETAIL 39A (6"BROKEN WHITE LINE) LF $ 4.00 2112 $ 8,448.00 THERMOPLASTIC PAVEMENT MARKING BIKE LANE MARKING SQFT $ 15.00 1230 $ 18,453.60 THERMOPLASTIC CROSSWALK AND PAVEMENT MARKING HIGH VISIBILITY CROSSWALK SQFT $ 20.00 3755 $ 75,093.33 12" THERMOPLASTIC TRAFFIC STRIPE LIMIT LINE (12"SOLID WHITE LINE) LF $ 4.00 469 $ 1,877.33 GREEN THERMOPLASTIC PAINT CONFLICT MARKINGS SQFT $ 19.50 3168 $ 61,776.00 $ -
$ -
Material Cost Subtotal $ 1,408,090.93
Mobilization 5% $ 70,404.55
Traffic Control 5% $ 70,404.55
Construction Cost Contingency 20% $ 281,618.19
Utility Contingency 5% $ 70,404.55
Drainage Contingency 5% $ 70,404.55
Environmental Contingency 5% $ 70,404.55
Subtotal $ 633,640.92
Construction Cost Subtotal $ 2,041,731.85
Engineering and Design Costs 15% $ 306,259.78
Construction Management 20% $ 408,346.37
Subtotal $ 714,606.15
Total Cost/Mile (2024 dollars) $ 2,756,338.00
Total Cost/Mile (2026 dollars) Years: 2 7% $ 3,155,731.38 Rounded Cost/Mile $ 3,160,000.00
Actual costs may vary based on project scope and current market conditions.

Caltrans maintains historical cost indices and forecast at:

Class II
Unit prices per recent Bid Items on Caltrans Contract Cost Data.

All costs adjusted to 2026 dollars.

Resurface street and stripe bike lanes

Page 175 of 1051 ends

Assumptions
1mile = 5280 ft
Average block distance 400 ft
Estimated total intersections in 1 mile: 13 intersections all-way stop intersections in 1 mile 4 intersections
Signalized intersections in 1 mile 1 intersection
Street curb to curb width 35 ft
Average side street width 35 ft
Shared lane marking spacing 200 ft
Restriping double yellow at each stop-controlled or signalized leg 50 ft Intersections with proposed traffic circles assumed to include 8 new directional curb ramps each
10' wide crosswalks, 24" lines, 5' spacing 140 sf
D11-1 signs per intersection 2
Total bike route distance 1 mi
CALTRANS ITEM DESRIPTION ITEM NOTES UNIT UNIT COST (2024) QUANTITY TOTAL COST THERMOPLASTIC PAVEMENT MARKING SHARED LANE MARKING, EVERY 200' EACH WAY SQFT $ 15.00 1056 $ 15,840.00 ROADSIDE SIGN - ONE POST D11-1 (BIKE ROUTE) EA $ 500.00 26 $ 13,200.00 THERMOPLASTIC CROSSWALK AND PAVEMENT MARKING HIGH VISIBILITY CROSSWALK SQFT $ 20.00 3024 $ 60,480.00 6" THERMOPLASTIC TRAFFIC STRIPE (DETAIL 28) DETAIL 28 (6" SOLID DOUBLE YELLOW LINES) LF $ 5.00 4818 $ 24,090.00 12" THERMOPLASTIC TRAFFIC STRIPE LIMIT LINE (12"SOLID WHITE LINE) LF $ 4.00 651 $ 2,604.00 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF $ 3.00 4818 $ 14,454.00 Material Cost Subtotal $ 130,668.00
Mobilization 5% $ 6,533.40
Traffic Control 5% $ 6,533.40
Construction Cost Contingency 20% $ 26,133.60
Utility Contingency 5% $ 6,533.40
Drainage Contingency 5% $ 6,533.40
Environmental Contingency 5% $ 6,533.40
Subtotal $ 58,800.60
Construction Cost Subtotal $ 189,468.60
Engineering and Design Costs 15% $ 28,420.29
Construction Management 20% $ 37,893.72
Subtotal $ 66,314.01
Total Cost/Mile (2024 dollars) $ 255,782.61
Total Cost/Mile (2026 dollars) Years: 2 7% $ 292,845.51 Rounded Cost/Mile $ 300,000.00
Actual costs may vary based on project scope and current market conditions.

Caltrans maintains historical cost indices and forecast at:

Class III - Bike Route
Unit prices per recent Bid Items on Caltrans Contract Cost Data.

All costs adjusted to 2026 dollars.

Shared lane pavement markings and signage

Page 176 of 1051 ends

Assumptions
1mile = 5280 ft
Average block distance 400 ft
Estimated total intersections in 1 mile: 13 intersections/blocks all-way stop intersections in 1 mile 4 intersections
Signalized intersections in 1 mile 1 intersection
Street curb to curb width 35 ft
Average side street width 35 ft
Shared lane marking spacing 200 ft
Restriping double yellow at each stop-controlled or signalized leg 50 ft Intersections with proposed traffic circles assumed to include 8 new directional curb ramps each
10' wide crosswalks, 24" lines, 5' spacing 140 sf
posts per speed cushion (2 signs per post at each block) 2 D11-1 signs per intersection 2
Total bike boulevard distance 1 mi
CALTRANS ITEM DESRIPTION ITEM NOTES UNIT UNIT COST (2024) QUANTITY TOTAL COST THERMOPLASTIC PAVEMENT MARKING SHARED LANE MARKING, EVERY 200' EACH WAY SQFT $ 15.00 1056 $ 15,840.00 SPEED HUMP EA $ 7,000.00 26 $ 184,800.00
ROADSIDE SIGN - ONE POST D11-1 (BIKE ROUTE) EA $ 500.00 26 $ 13,200.00 ROADSIDE SIGN - ONE POST SPEED CUSHION SIGN EA $ 500.00 26 $ 13,200.00

INSTALL SIGN (STRAP AND SADDLE BRACKET METHOD)
W13-1P (ADVISORY SPEED PLAQUE UNDER SPEED CUSHION
SIGN) EA $ 370.00 26 $ 9,768.00
THERMOPLASTIC CROSSWALK AND PAVEMENT MARKING HIGH VISIBILITY CROSSWALK SQFT $ 20.00 3024 $ 60,480.00 6" THERMOPLASTIC TRAFFIC STRIPE (DETAIL 28) DETAIL 28 (6" SOLID DOUBLE YELLOW LINES) LF $ 5.00 4818 $ 24,090.00 12" THERMOPLASTIC TRAFFIC STRIPE LIMIT LINE (12"SOLID WHITE LINE) LF $ 4.00 651 $ 2,604.00 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF $ 3.00 4818 $ 14,454.00 THERMOPLASTIC PAVEMENT MARKING SPEED HUMP MARKING (2 PER CUSHION) SQFT $ 15.00 634 $ 9,504.00 Material Cost Subtotal $ 347,940.00
Mobilization 5% $ 17,397.00
Traffic Control 5% $ 17,397.00
Construction Cost Contingency 20% $ 69,588.00
Utility Contingency 5% $ 17,397.00
Drainage Contingency 5% $ 17,397.00
Environmental Contingency 5% $ 17,397.00
Subtotal $ 156,573.00
Construction Cost Subtotal $ 504,513.00
Engineering and Design Costs 15% $ 75,676.95
Construction Management 20% $ 100,902.60
Subtotal $ 176,579.55
Total Cost/Mile (2024 dollars) $ 681,092.55
Total Cost/Mile (2026 dollars) Years: 2 7% $ 779,782.86 Rounded Cost/Mile $ 780,000.00
Actual costs may vary based on project scope and current market conditions.

Caltrans maintains historical cost indices and forecast at:

Class III - Bike Boulevard
Unit prices per recent Bid Items on Caltrans Contract Cost Data.

All costs adjusted to 2026 dollars.

Shared lane pavement markings and signage. Only speed humps, signing and striping

Page 177 of 1051 ends

MASTER UNIT + SOFT COSTS

Page 178 of 1051 ends

City of St Helena Streets Master Plan
Per Mile Cost Opinion
Mar-26
Table 1: Materials Unit Costs Table 2: Soft Costs and Contingencies CALTRANS ITEM NO. CALTRANS ITEM DESRIPTION ITEM NOTES UNIT UNIT COST (2024) UNIT COST DATA SOURCE Contingency Percentage 1 DEMOLITION INCLUDES EXCAVATION, ALL CONCRETE
REMOVAL, AND REPROFILING CY $240.00 Caltrans Contract Cost Data Engineering and Design Costs 15% 390132 HOT MIX ASPHALT (TYPE A) TON $220.00 Caltrans Contract Cost Data Mobilization 5% 730010 MINOR CONCRETE (CURB) LF $140.00 Caltrans Contract Cost Data Traffic Control 5% 731504 MINOR CONCRETE (CURB AND GUTTER) LF $160.00 Caltrans Contract Cost Data Construction Management 20% 731521 MINOR CONCRETE (SIDEWALK) CY $830.00 Caltrans Contract Cost Data Construction Cost Contingency 20% 731623 MINOR CONCRETE (CURB RAMP) ASSUMING 1 CY PER UNIDIRECTIONAL CURB RAMP CY $1,500.00 Caltrans Contract Cost Data Utility Contingency 5% 730070 DETECTABLE WARNING SURFACE SQFT $60.00 Caltrans Contract Cost Data Drainage Contingency 5% 250201 CLASS 2 AGGREGATE SUBBASE CY $120.00 Caltrans Contract Cost Data Environmental Contingency 5% 840519 THERMOPLASTIC CROSSWALK AND PAVEMENT MARKING HIGH VISIBILITY CROSSWALK SQFT $20.00 City of Glendale North Brand Blvd. Complete Streets Demonstration Project Bid Comparison Escalation to 2026 dollars 7% 840505 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN YELLOW) 6" BROKEN YELLOW LF $4.00 Caltrans Contract Cost Data 840505 6" THERMOPLASTIC TRAFFIC STRIPE (SOLID WHITE) 6" SOLID WHITE LF $4.00 Caltrans Contract Cost Data 840530 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 17-7) DETAIL 8 (6" BROKEN WHITE LINE) LF $4.00 Caltrans Contract Cost Data 840505 6" THERMOPLASTIC TRAFFIC STRIPE (DETAIL 28) DETAIL 28 (6" SOLID DOUBLE YELLOW LINES) LF $5.00 Caltrans Contract Cost Data 840505 6" THERMOPLASTIC TRAFFIC STRIPE (DETAIL 39) DETAIL 39 (6" SOLID WHITE LINE) LF $4.00 Caltrans Contract Cost Data 840507 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 8-4) DETAIL 39A (6"BROKEN WHITE LINE) LF $4.00 Caltrans Contract Cost Data 840506 8" THERMOPLASTIC TRAFFIC STRIPE DETAIL 38A (8" SOLID WHITE LINE) LF $4.00 Caltrans Contract Cost Data 840555 12" THERMOPLASTIC TRAFFIC STRIPE LIMIT LINE (12"SOLID WHITE LINE) LF $4.00 Caltrans Contract Cost Data 840519 THERMOPLASTIC CROSSWALK AND PAVEMENT MARKING HIGH VISIBILITY CROSSWALK SQFT $15.00 Caltrans Contract Cost Data 840515 THERMOPLASTIC PAVEMENT MARKING SQFT $15.00 Caltrans Contract Cost Data 846026 REMOVE PAVEMENT MARKING REMOVE EXISTING PAVEMENT MARKING SQFT $20.00 Caltrans Contract Cost Data 846030 REMOVE THERMOPLASTIC TRAFFIC STRIPE REMOVE EXISTING THERMOPLASTIC TRAFFIC STRIPE LF $3.00 Caltrans Contract Cost Data
REMOVE PAVEMENT MARKINGS (THERMOPLASTIC) REMOVE CROSSWALK SQFT $3.00 https://dpw.lacounty.gov/general/bids/pdf/RDC0 016284.pdf
820840 ROADSIDE SIGN - ONE POST R81A (BIKE LANE) EA $500.00 Caltrans Contract Cost Data 820250 REMOVE ROADSIDE SIGN EA $180.00 Caltrans Contract Cost Data 820590 RELOCATE ROADSIDE SIGN-ONE POST TRAFFIC CIRCLE STOP SIGN RELOCATION EA $285.00 Caltrans Contract Cost Data MODIFYING SIGNAL LEADING PEDESTRIAN INTERVAL LS $3,500.00 http://www.pedbikesafe.org/pedsafe/counterme asures_detail.cfm?CM_NUM=12
The unit costs and soft costs/contingencies applied to all cost estimates can be found on this sheet. Unit costs are presented in Table 1, and soft costs/contingencies are in Table 2. These values can be updated, as needed.

Opinions of probable cost were developed by identifying major pay items and establishing rough quantities to determine a rough order of magnitude cost. Contingencies are included to cover items that are undefined or are typically unknown early in the planning phase of a project. Unit costs are based on 2024 dollars and were assigned based on historical cost data from the Caltrans Contract Cost Data. Cost opinions do not include easement and right-of-way acquisition; permitting; surveying, geotechnical investigation, environmental documentation, special site remediation, escalation, or the cost for ongoing maintenance. A general cost has been assigned to certain general categories such as utility relocations; however, these costs can vary widely depending on the exact details and nature of the work. The overall cost opinions are intended to be general and used only for planning purposes. TDG Engineering, Inc. makes no guarantees or warranties regarding the cost estimate herein. Construction costs will vary based on the ultimate project scope, actual site conditions and constraints, schedule, and economic conditions at the time of construction.

Soft Costs and Contingencies
As applicable, contingencies for construction, environmental impacts, drainage, utilities, and design are assumed. Contingencies that vary facility type to facility type are based upon our experience with the complexities of implementing them.

Page 179 of 1051 ends

870111 INDUCTIVE LOOP DETECTOR BIKE DETECTION LOOPS EA $1,800.00 La Crescenta Bid Comparison 810170 DELINEATOR (CLASS 1) BOLLARD (K-71) EA $360.00 La Crescenta Bid Comparison 780433 PAINT CURB (2-COAT) RED CURB LF $8.00 Caltrans Contract Cost Data 2 SEGMENTAL DIVIDERS ZEBRA BIKE LANE DIVIDERS / ARMADILLOS EA $80.00 https://mtc.ca.gov/sites/default/files/MTC_Cross road_Lab_Quick_Build_04092020.pdf
3 GREEN THERMOPLASTIC PAINT CONFLICT MARKINGS SQFT $19.50 Bid Comparison San Fernando Beautification 4 INSTALL CONCRETE K-RAIL LF $65.00 City of Glendale North Brand Blvd. Complete Streets Demonstration Project Bid Comparison
5 SPEED HUMP EA $7,000.00
https://lacity.primegov.com/meeting/attachment
/406211.pdf?name=Report%20from%20Los%2
0Angeles%20Department%20of%20Transportati
on%20dated%203-31-22
8 TRAFFIC CIRCLE INCLUDES LANDSCAPE. NO RAMPS. EA $100,000.00 AHSC Round 7 Public Works_Transportation Unit Cost Estimates
820860 INSTALL SIGN (STRAP AND SADDLE BRACKET METHOD)
W13-1P (ADVISORY SPEED PLAQUE UNDER
SPEED CUSHION SIGN) EA $370.00 Bid Comparison San Fernando Beautification 9 CURB EXTENSIONS EA $55,000.00 AHSC Round 7 Public Works_Transportation Unit Cost Estimates
398200 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD $25.00 Caltrans Contract Cost Data 10 TRAFFIC SIGNAL MODIFICATION EA $30,000.00 AHSC Round 7 Public Works_Transportation Unit Cost Estimates
11 PRECAST CONCRETE BUFFER LF $75.00
12 LANDSCAPE SF $15.00
HIGH-VISIBILITY CROSSWALK 40' LONG, 10' WIDE EA $3,000.00 SIGNS W13-1P (ADVISORY SPEED PLAQUE UNDER
SPEED CUSHION SIGN) EA $370
RRFB EA $ 15,000.00
CURB EXTENSIONS 350 SF at 6" depth EA $5,400.00 Caltrans Contract Cost Data for Minor Concrete (Sidewalk)
CURB RAMPS ASSUMING 1 CY PER UNIDIRECTIONAL CURB
RAMP EA $1,500.00 Caltrans Contract Cost Data
SEGMENTAL DIVIDER ZEBRA BIKE LANE DIVIDERS / ARMADILLOS EA $80 https://mtc.ca.gov/sites/default/files/MTC_Cross road_Lab_Quick_Build_04092020.pdf
SPEED HUMP EA $7,000
/406211.pdf?name=Report%20from%20Los%20
Angeles%20Department%20of%20Transportatio
Cells of this color do not have a Caltrans Item Number
Cost Data Sources
Cost data was pulled from recent bid items per the Caltrans Contract Cost Database, and City of Glendale North Brand Blvd. Complete Streets Demonstration Project Bid Comparison (11/02/2023)

THE BELOW COSTS ARE FOR THE PROPOSED CROSSING IMPROVEMENTS

Page 180 of 1051 ends

St Helena Streets Master Plan
Appendix E
Project Cost Opinions

Page 181 of 1051 ends

City of St. Helena Prepared By: Sofia Pollmann
St. Helena Streets Master Plan Date: 4/1/2025
October 2025
Spring Street

DESCRIPTION QTY UNIT UNIT PRICE AMOUNT
Roadway Excavation 500 CY $300.00 $150,000
Cold Plane Asphalt Concrete Pavement 13400 SY $25.00 $335,000 Hot Mix Asphalt (Type A) 2244 TON $300.00 $673,333
Minor Concrete (Sidewalk) 220 CY $830.00 $182,600
Class 2 Aggregate Base 590 CY $120.00 $70,767
Curb Ramps 32 EA $1,500.00 $48,000
Detectable Warning Surface 320 SF $60.00 $19,200
Minor Concrete (Curb and Gutter) 3620 LF $180.00 $651,600 Speed Humps 6 EA $7,000.00 $42,000
Pavement Markings Symbols 48 SF $15.00 $720
24" Pavement Markings Crosswalks 5880 SF $20.00 $117,600 12" Thermoplastic Traffic Stripe 260 LF $4.00 $1,040
6" Thermoplastic Traffic Stripe (White) 5720 LF $5.00 $28,600 6" Thermoplastic Double Yellow Line 2720 LF $5.00 $13,600 Street Trees 34 EA $200.00 $6,760
Landscape 5408 SF $15.00 $81,120
Traffic Signs & Posts 1 LS $7,500.00 $7,500
Drainage and Utility Modifications/Adjustments (15%) 1 LS $364,416.11 $364,416 Mobilization (5%) 1 LS $139,692.84 $139,693
Maintenance of Traffic (5%) 1 LS $139,692.84 $139,693
Erosion and Sediment Control (2%) 1 LS $55,877.14 $55,877 SUBTOTAL = $3,129,120

CONTINGENCIES
15% ENGINEERING AND DESIGN COSTS = $469,368
20% CONSTRUCTION MANAGEMENT = $625,824
35% CONTINGENCY = $1,095,192
TOTAL = $5,319,503
General Assumptions and Exclusions:

1. Unit prices are based on Caltrans District 4 Contract Cost Data, using the most recent available data from this time period.

2. The opinion does not include environmental permitting, easement, or property acquisition.

3. The opinion does not include construction administration and inspection services.

4. The opinion does not include public outreach, funding planning, or client management services.

5. The Drainage and Utility Modifications lump sum unit price assumes: 15% cost of project.

6. This cost opinion was developed in October 2025. The latest National Highway Construction Cost index for Q1 2025 is 3.167

7. The ENR Construction Cost Index at the time of this estimate is 15,459 Preliminary Opinion of Probable Cost
Opinions of probable costs were developed by identifying major pay items and establishing rough quantities to determine a rough order of magnitude cost. Additional pay items have been assigned approximate lump sum prices based on a percentage of the anticipated construction cost. Planning-level cost opinions include a 35% contingency to cover items that are undefined or are typically unknown early in the planning phase of a project. Unit costs are based on 2025 dollars and were assigned based on historical cost data from Caltrans Contract District 4 Cost Data. Cost opinions do not include easement and right-of-way acquisition; permitting, inspection, or construction management; engineering, surveying, geotechnical investigation, environmental documentation, special site remediation, escalation, or the cost for ongoing maintenance.

A cost range has been assigned to certain general categories such as utility relocations; however, these costs can vary widely depending on the exact details and nature of the work. The overall cost opinions are intended to be general and used only for planning purposes. Toole Design Group, LLC makes no guarantees or warranties regarding the cost estimate herein. Construction costs will vary based on the ultimate project scope, actual site conditions and constraints, schedule, and economic conditions at the time of construction.

Page 182 of 1051 ends

City of St. Helena Prepared By: Sofia Pollmann
St. Helena Streets Master Plan Date: 4/1/2025
October 2025
Adams Street

DESCRIPTION QTY UNIT UNIT PRICE AMOUNT
Clearing & Grubbing 1 LS $340,000.00 $340,000
Hot Mix Asphalt 903 TON $300.00 $270,904
Class 2 Aggregate Base 1548 CY $120.00 $185,724
Minor Concrete (Sidewalk) 140 SY $830.00 $116,200
Curb Ramps 11 EA $1,500.00 $16,500
Detectable Warning Surface 110 SF $60.00 $6,600
Minor Concrete (Curb and Gutter) 0 LF $180.00 $0
Pavement Markings Symbols 11 SF $15.00 $165
24" Pavement Markings Crosswalks 840 SF $20.00 $16,800
12" Thermoplastic Traffic Stripe 125 LF $20.00 $2,500
6" Thermoplastic Traffic Stripe (Yellow) 2500 LF $5.00 $12,500 6" Thermoplastic Traffic Stripe (White) 3500 LF $5.00 $17,500 6" Thermoplastic Double Yellow Line 2500 LF $5.00 $12,500 Midwest Guardrail System 2500 LF $60.00 $150,000
Traffic Signal Modifications 1 LS $300,000.00 $300,000
Street Lighting 1 LS $550,000.00 $550,000
Misc Street Furniture (1%) 1 LS $19,978.94 $19,979
Drainage and Utility Modifications/Adjustments (15%) 1 LS $299,684.08 $299,684 Bridge and Levee Structure 1 LS $32,571,000.00 $32,571,000 See Nov 2025
Adams
Street bridge
costing for
more information
Mobilization (5%) 1 LS $99,894.69 $99,895
Maintenance of Traffic (5%) 1 LS $99,894.69 $99,895
Erosion and Sediment Control (2%) 1 LS $39,957.88 $39,958 SUBTOTAL = $34,788,304

CONTINGENCIES
15% ENGINEERING AND DESIGN COSTS = $5,218,246
20% CONSTRUCTION MANAGEMENT = $6,957,661
35% CONTINGENCY = $12,175,906
TOTAL = $59,140,117
General Assumptions and Exclusions:

1. Unit prices are based on Caltrans District 4 Contract Cost Data, using the most recent available data from this time period.

2. The opinion does not include environmental permitting, easement, or property acquisition.

3. The opinion does not include construction administration and inspection services.

4. The opinion does not include public outreach, funding planning, or client management services.

6. The New Drainage and Utility lump sum unit price assumes: 15% cost of project.

7. The Street Lighting Adjustments lump sum unit price assumes: New streetlights every 100' O.C.

8. This cost opinion was developed in October 2025. The latest National Highway Construction Cost index for Q1 2025 is 3.167

9. The ENR Construction Cost Index at the time of this estimate is 15,459

10. This estimate does not include right-of-way acquisition, building demolition, hazard remediation, permit and inspection fees, and testing

11. This engineer's opinion is based on extending Adams Street from Starr Ave to Silverado Trail N including a bridge over the Napa River

12. This engineer's opinion does not include any agency fees

13. This engineer's opinion is for informational and planning purposes only. Acrual costs should be provided by a contractor

14. This engineer's opinion does not include any landscaping or irrigation work Preliminary Opinion of Probable Cost
Opinions of probable costs were developed by identifying major pay items and establishing rough quantities to determine a rough order of magnitude cost. Additional pay items have been assigned approximate lump sum prices based on a percentage of the anticipated construction cost. Planning-level cost opinions include a 35% contingency to cover items that are undefined or are typically unknown early in the planning phase of a project. Unit costs are based on 2025 dollars and were assigned based on historical cost data from Caltrans Contract District 4 Cost Data.

Cost opinions do not include easement and right-of-way acquisition; permitting, inspection, or construction management; engineering, surveying, geotechnical investigation, environmental documentation, special site remediation, escalation, or the cost for ongoing maintenance. A cost range has been assigned to certain general categories such as utility relocations; however, these costs can vary widely depending on the exact details and nature of the work. The overall cost opinions are intended to be general and used only for planning purposes. Toole Design Group, LLC makes no guarantees or warranties regarding the cost estimate herein. Construction costs will vary based on the ultimate project scope, actual site conditions and constraints, schedule, and economic conditions at the time of construction.

5. The Traffic Signal Modifications lump sum unit price assumes: New traffic signal infrastructure at Adams Street and Silverado Trail N.

Page 183 of 1051 ends

Engineer's Preliminary Opinion of Probable
Construction Costs for
Adams Street Bridge Improvements
Redwood City
255 ShoreLine Drive, Suite 200
Redwood City, CA 94065
Tel: 650.482.6300
Fax: 650.482.6399
Date: 2/10/2021 11/25/2025 BKF Job #: 232531

ITEM DESCRIPTION UNIT PRICE QUANTITY UNIT TOTAL NOTES

1. Viaduct (Flat slab on pile extensions) $700 39,900 SF $27,930,000 Quantity is based on a 42' width and 950' length.

2. Napa River Clear Span (5' deep precast girder with 10" thick deck) $850 5,460 SF $4,641,000 Quantity is based on a 42' width and 130' length. $32,571,000

1. Contingency 30% 1 LS $9,772,000
$42,343,000

1. 2.

3. 4.

5. 6.

7. Unit costs for the viaduct and Napa River bridge were developed by reviewing the 2023 Caltrans Comparative Bridge Costs and consulting with Biggs Cardosa Structural Engineers.

Unit costs are informed by recent construction cost estimates on comparable projects and engineering judgement.

Subcontractor mobilization and general contractor costs are excluded from this estimate This engineer's opinion is based on extending Adams Street from Starr Ave to Silverado Trail N including a bridge over the Napa River NOTES
FINAL TOTAL:

STRUCTURES SUB-TOTAL:

This engineer's opinion does not include any agency fees This engineer's opinion is for informational and planning purposes only. Actual costs should be provided by a contractor This engineer's opinion does not include any lighting, landscaping, or irrigation work This estimate does not include right-of-way acquisition, building demolition, hazard remediation, permit and inspection fees, and testing Adams Street Extension

ADAMS STREET EXTENSION CONSTRUCTION
A. STRUCTURES

Page 1 ends
Page 184 of 1051 ends

PROPOSED LEVEE

DEL RIO COURT

REDONDO COURT

LAGUNA SECA CT
SAN
ARDO
CT

INTERPRETIVE TRAIL

ADAMS STREET

POPE STREET

SILVERADO TRAIL
SEE NOTE 2
SEE NOTE 3
SEE NOTE 5
SEE NOTE 3

WATER MAIN

RELOCATION

AS-BUILT

RECORD DRAWINGS
APRIL 2011

VERIFY SCALES

1. NO ACCESS, STORAGE OF EQUIPMENT, MATERIALS OR
WORK PRODUCTS ON ROADWAYS WITHIN VINEYARDVALLEY MOBILE HOME PARK OUTSIDE OF PROJECT ROWWILL BE ALLOWED.

2. PRIMARY ACCESS TO THE ENTIRE CONSTRUCTION SITE
SHALL BE VIA ADAMS STREET.

3. ACCESS VIA PASEO GRANDE & DEL RIO COURT SHALL BE

LIMITED TO ACTIVITIES ESSENTIAL TO FLOODWALL
CONSTRUCTION DOWNSTREAM OF STATION 28+60.

4. ACCESS VIA REDONDO COURT SHALL BE PERMITTED FOR
CONSTRUCTION OF STORM TOE DRAIN OUTLET ONLY.
(SEE DRAWING FP-2)

5. DUE TO PERMITTING CONDITIONS, ACCESS TO AREAS ON

THE RIVER SIDE OF THE PARKS PEDESTRIAN WALKWAY

ALONG THE RIVERBANK WILL NOT BE PROVIDED AFTER
NOVEMBER 1ST.

ACCESS ROUTE
Levee Portion ~ 1,000 ftExisting Top of LeveeElevation: 221.2 ft Viaduct Portion ~ 950 ft
Napa River Bridge ~ 130 ft Adam Street Segment by
Hunter Subdivision Project
Meadowood Ln
Finished GradeElevation 227 ft perB.F.E. 220 ft

RAMP UP

MEADOWOODLANE

NAPARIVER
ELEVATION 227 TOP OF LEVEE
221.2
24' 12'
~18" with caltrans barrieror metal barrier designedby architect ~1' w/ caltrans barrier
42' VIADUCT

NAPA RIVERBRIDGE
RAMP UP/DOWNFROM VIADUCT.MAX 5% SLOPE
LEVEE AS-BUILTMARKUPBKF ENGINEERS11/25/2025

EXISTINGGRADE

VIADUCT AND BRIDGECROSS SECTION

Page 185 of 1051 ends

National Flood Hazard Layer FIRMette
0 250 500 1,000 1,500 2,000
Feet
Ü

SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT

SPECIAL FLOOD

HAZARD AREAS
Without Base Flood Elevation (BFE)
Zone A, V, A99
With BFE or Depth Zone AE, AO, AH, VE, AR
Regulatory Floodway

0.2% Annual Chance Flood Hazard, Areas
of 1% annual chance flood with average
depth less than one foot or with drainage
areas of less than one square mile Zone X
Future Conditions 1% Annual
Chance Flood Hazard Zone X
Area with Reduced Flood Risk due to
Levee. See Notes. Zone X
Area with Flood Risk due to Levee Zone D
NO SCREEN Area of Minimal Flood Hazard Zone X
Area of Undetermined Flood Hazard Zone D
Channel, Culvert, or Storm Sewer
Levee, Dike, or Floodwall
Cross Sections with 1% Annual Chance

17.5 Water Surface Elevation
Coastal Transect
Coastal Transect Baseline
Profile Baseline
Hydrographic Feature
Base Flood Elevation Line (BFE)
Effective LOMRs
Limit of Study
Jurisdiction Boundary
Digital Data Available
No Digital Data Available
Unmapped
This map complies with FEMA's standards for the use of
digital flood maps if it is not void as described below.

The basemap shown complies with FEMA's basemap
accuracy standards
The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA. This map was exported on 11/25/2025 at 11:56 PM and does not
reflect changes or amendments subsequent to this date and time. The NFHL and effective information may change or
become superseded by new data over time.

This map image is void if the one or more of the following map elements do not appear: basemap imagery, flood zone labels, legend, scale bar, map creation date, community identifiers, FIRM panel number, and FIRM effective date. Map images for unmapped and unmodernized areas cannot be used for
regulatory purposes.

Legend

OTHER AREAS OF

FLOOD HAZARD

OTHER AREAS

GENERAL

STRUCTURES
OTHER

FEATURES

MAP PANELS
8 B

20.2 The pin displayed on the map is an approximate
point selected by the user and does not represent
an authoritative property location.
1:6,000
122°28'5"W 38°31'10"N
122°27'28"W 38°30'42"N
Basemap Imagery Source: USGS National Map 2023 Page 186 of 1051

TECHNICAL MEMORANDUM

BKF ENGINEERS
Redwood City Office: 255 Shoreline Drive, Suite 200, Redwood City, CA 94065 | 650.482.6300 Date: November 25, 2025 BKF Job Number: 20232531
Deliver To: Anju Palta
Toole Design – Transmitted Via Email: [email protected] From: Patrick Connors, PE
Andy Snitovsky, PE
BKF Engineers, Redwood City, CA 94065
Subject: St. Helena Streets Master Plan – Adams Street Extension Levee Impact Review This memorandum provides an overview of the proposed Adams Street roadway extension from the existing levee to Silverado Trail N. A proposed bridge and road through the flood plain are required for this roadway extension. Below is BKF’s review including a street design summary, stormwater management, and geotechnical considerations.

OVERVIEW
The Adams Street extension is planned to extend from Starr Avenue to Silverado Trail N including a bridge across Napa River. The roadway coincides with a levee for about 1000 feet, before diverging to cross a Habitat Restoration Area and the Napa River until eventually reaching the Silverado Trail N and Meadwood Lane intersection. A diagram of the road extension is provided below for reference and in the attached markup.

Page 187 of 1051 ends

November 25, 2025

Page 2 of 6 ends

STREETSCAPE DESIGN
The of the crown on the levee is 48 feet wide, and the planned Adams Street cross-section is 44 feet which will sit on the crown with an additional 2’ of existing levee on either side. The proposed roadway will consist of two 11’ travel lanes, a 10’ shared-use path, and two 6’ shoulders. Guardrails are expected on either side of the travel lanes since the existing levee slopes are steeper than 4:1.

Below is a June 2025 version of the Proposed Typical Cross Section from the “Adams Street Conceptual Plan”. To match the above plan, the following updates are required:
- The curb and gutter along the shared use path will be removed and the path will be placed atgrade with the travel lanes to allow stormwater sheet flow off the side of the levee - The right-side guardrail will be placed between the shared use path and the travel lane to protect the shared-use path from adjacent traffic
- The right-side shoulder will remain to the right of the shared use path Where the street crosses bridge structures, the cross-section would look similar to the one above consisting of:
- Two 12’ Travel Lanes
- One 12’ Shared Use Path
- Two 3’ Shoulders with Sidewalls/Guardrails
42’ Total Structure Width
The existing top of levee elevation is 221.2 per record drawings, which is approximately 1.2' above the FEMA base flood elevation on the outboard side of the levee. We anticipate that the top of roadway elevation would need to be set at approximately elevation 227 to allow for adequate structure depth and freeboard to the existing FEMA base flood elevation. An embankment should be considered where the viaduct structure connects to the top of levee and to the Silverado Trail/Meadwood intersection.

The extent of the embankment should be minimized to avoid displacement of floodwaters. This

Page 188 of 1051 ends

November 25, 2025

Page 3 of 6 ends

embankment would serve as a transition to the viaduct structure and also allow for the roadway to start sloping up to achieve the required top of roadway structure elevation.

Hydrologic and Hydraulic study would be needed to determine allowable extent of embankment and required drainage measures to be implemented such as culverts.

STORMWATER MANAGEMENT
Under California’s Municipal Regional Stormwater Permit, provision C.3 requires stormwater runoff management for roadway projects that produce over 10,000 square feet in impervious surface [Provisions C.3.b.ii.(4)]. C.3 recommends a design strategy of directing runoff from sidewalks, walkways, driveways, and parking lots to vegetated areas [Provisions C.3.c.i.(2)(a)(v)] and that 100% of the amount of runoff identified by Provisions C.3.d be treated via LID, including infiltration, evapotranspiration, and biotreatment measures [Provisions C.3.c.i.(2)(b)].

The surroundings of the levee can be used as an LID self-retaining area, meaning stormwater could be conveyed off the paved areas directly via sheet flow. This should be facilitated by grading impervious surfaces to pervious surfaces at a maximum ratio of 2:1. Flowlines in this area and under the viaduct can be viewed on the attached markup.

Addition of the paved roadway atop the levee will create new impervious surface and result in an incremental increase in stormwater runoff. The rate of runoff should be reviewed to verify that the existing detention basin and pump station on the inboard side of the levee have adequate capacity for the additional runoff.

OTHER CONSIDERATIONS
Other items include geotechnical and environmental design considerations:
- The existing top of levee elevations should be maintained when building the new roadway to avoid compromising the FEMA accreditation for the levee. - Due to asphalt concrete pavement being heavier than existing natural soil, geotechnical review will need to be completed to determine if settlement will become a concern with the additional weight. Vehicular loading (live load) should also be evaluated and added to the dead load of the pavement section. One method to compensate for settlement may be to raise grades for the proposed roadway.
- Where the roadway diverges from the top of the levee and extends toward the Napa River, a viaduct structure is anticipated to be constructed. This structure would pass through a Habitat Restoration area which is permanently preserved by a conservation agreement under the Land Trust of Napa County. Environmental permitting specialists should be consulted to advise on the implications of constructing a roadway structure through this area. A roadway alignment west of the Habitat Restoration area may be considered to avoid the area.

ATTACHMENTS

1. Levee As-Built Markup, by BKF Engineers

2. National Flood Hazard Layer FEMA FIRMETTE

3. Adams Street Cost Estimate for Viaduct and Bridge, by BKF Engineers

Page 189 of 1051 ends

November 25, 2025

Page 4 of 6 ends

SITE VISIT PHOTOS
Figure 1. View from top of levee looking back toward Starr Avenue Figure 2. View from top of levee looking toward Napa River/Silverado Trail

Page 190 of 1051 ends

November 25, 2025

Page 5 of 6 ends

Figure 3. Habitat restoration area signage
Figure 4. Looking across Napa River at approximate bridge location

Page 191 of 1051 ends

November 25, 2025

Page 6 of 6 ends

Figure 5 Habitat restoration area looking back towards levee from Napa River

Page 192 of 1051 ends

Engineer's Preliminary Opinion of Probable
Construction Costs for
Oak Avenue Improvements
Redwood City
255 ShoreLine Drive, Suite 200
Redwood City, CA 94065
Tel: 650.482.6300
Fax: 650.482.6399
Date: 2/10/2021 1/16/2026 BKF Job #: 232531

ITEM DESCRIPTION
UNIT COST1
2001
ESCALATED3

UNIT COST
2025

BKF SUGGESTED

UNIT COST
2025 QUANTITY1 UNIT
TOTAL
2001

ESCALATED
TOTAL
2025

BKF SUGGESTED
TOTAL
2025 NOTES

1. Earthwork: Cut $5 $20 $40 575 CY $2,875 $11,500 $23,000

2. Earthwork: Fill $15 $58 $60 2,873 CY $43,095 $167,000 $173,000

3. Roadway: .40' Asphalt Pavement $2 $6 $6 25,795 SF $38,693 $155,000 $155,000

4. Roadway: 1.50' Aggregate Base $3 $12 $15 25,795 SF $77,385 $310,000 $387,000

5. Roadway: Curb and Gutter $15 $58 $75 1,302 LF $19,530 $76,000 $98,000

6. Roadway: Sidewalk $5 $20 $25 7,660 SF $38,300 $154,000 $192,000

7. Roadway: Planter Strip $4 $16 $25 4,864 SF $19,456 $78,000 $122,000

8. Utilities: 10" Water $70 $269 $350 843 LF $59,010 $227,000 $296,000

9. Utilities: 6" Reclaimed Water $60 $231 $300 843 LF $50,580 $195,000 $253,000

10. Utilitites: Street Lights $15 $58 $530 733 LF $10,995 $43,000 $389,000 Assuming a street light every 30' on
both sides of the street.

11. Structures: Bridge over Sulphur Creek $2,750,000 $10,562,050 $20,000,000 1 EA $2,750,000 $10,563,000 $20,000,000 Assumes supports mid-span. Unit
cost is based on 60' width, 400'
length and approximately $850/SF.

12. Traffic Control: Signing and Striping $7,660 $29,421 $75,000 1 LS $7,660 $30,000 $75,000

13. Street Monumentation $1,499 $5,759 $25,000 1 LS $1,499 $6,000 $25,000

14. Erosion Control $14,077 $54,066 $90,000 1 LS $14,077 $55,000 $90,000

15. Clearing and Grubbing 3% 3% 3% 1 LS $93,995 $363,000 $669,000

16. Mobilization 10% 10% 10% 1 LS $313,315 $1,208,000 $2,228,000

17. Right-of-Way Acquisition - - - 1 LS $2,389,240 $2,389,240 $2,389,240 See note 4 $5,929,705 $16,030,740 $27,564,240
Contingency 35% 35% 35% 1 LS $2,075,397 $5,610,759 $9,647,484 $8,005,102 $21,641,499 $37,211,724

1. Earthwork: Cut $5 $20 $40 925 CY $4,625 $18,500 $37,000

2. Earthwork: Fill $15 $58 $60 4,627 CY $69,405 $269,000 $278,000

3. Roadway: .40' Asphalt Pavement $2 $6 $6 41,555 SF $62,333 $250,000 $250,000

4. Roadway: 1.50' Aggregate Base $3 $12 $15 41,555 SF $124,665 $499,000 $624,000

5. Roadway: Curb and Gutter $15 $58 $75 2,098 LF $31,470 $122,000 $158,000

6. Roadway: Sidewalk $5 $20 $25 12,340 SF $61,700 $247,000 $309,000

7. Roadway: Planter Strip $4 $16 $25 7,836 SF $31,344 $126,000 $196,000

8. Utilities: 24" RCP Storm Drain $75 $289 $375 1,400 LF $105,000 $405,000 $525,000

9. Utilities: 10" Water $70 $269 $350 1,357 LF $94,990 $366,000 $475,000

10. Utilities: 12" Sewer $70 $269 $400 1,350 LF $94,500 $364,000 $540,000

11. Utilities: 6" Reclaimed Water $60 $231 $300 1,357 LF $81,420 $314,000 $408,000

12. Utilities: Joint Trench $130 $500 $600 2,200 LF $286,000 $1,100,000 $1,320,000

13. Utilitites: Street Lights $15 $58 $530 1,467 LF $22,005 $86,000 $778,000

14. Traffic Control: Signing and Striping $12,340 $47,395 $75,000 1 LS $12,340 $48,000 $75,000

15. Street Monumentation $3,001 $11,525 $25,000 1 LS $3,001 $12,000 $25,000

16. Erosion Control $28,173 $108,206 $75,000 1 LS $28,173 $109,000 $75,000

17. Clearing and Grubbing 3% 3% 3% 1 LS $33,389 $131,000 $183,000

17. Mobilization 10% 10% 10% 1 LS $111,297 $434,000 $608,000

18. Right-of-Way Acquisition - - - 1 LS $4,530,540 $4,530,540 $4,530,540 See note 4 $5,788,196 $9,431,040 $11,394,540
Contingency 35% 35% 35% 1 LS $2,025,869 $3,300,864 $3,988,089 $7,814,065 $12,731,904 $15,382,629
$15,819,167 $34,373,403 $52,594,353

1. 2.

3. 4.

Quantities and 2001 cost estimates are sourced from Highway 29 Corridor Specific Plan Conceptual Design Cost Estimate sheet dated Feb 28, 2001 Oak Avenue Extension
A. SEGMENT 1: MITCHELL DRIVE TO CHARTER OAK AVENUE
SEGMENT 1 SUBTOTAL:

B. SEGMENT 2: CHARTER OAK AVENUE TO GRAYSON AVENUE
SEGMENT 2 SUBTOTAL:

SEGMENT 1 TOTAL:

SEGMENT 2 TOTAL:
2025 ENR unit costs are calculated from the 2001 costs multiplied by ENR CCI escalation rate of 3.84 (for ENR Rate column) This estimate does not include building demolition, hazard remediation, permit and inspection fees, and testing

OAK AVENUE EXTENSION CONSTRUCTION
Right-of-way aquistion costs are based on an estimate provided by Toole Design dated December 2025.

FINAL TOTAL:

NOTES

Page 1 ends
Page 193 of 1051 ends

Parcel number Current Land Use Zoning District
Est. acreage
needed Est. cost per acre Est. cost Feasibility notes
009-263-005-000 Vacant Public/Quasi-Public 0.21 $0 $0 No assessed value; public land. 009-263-014-000 Vacant commercial
with misc.
improvements
Mixed Use 0.23 $2,254,000 $518,420 Alignment doesn't appear to intersect with existing structures.

Est. acreage assumes alignment
only.
009-263-007-000 Motel - B&B Mixed Use 0.39 $2,254,000 $879,060 Alignment might be able to route around existing structure. Est.
acreage assumes more land than
alignment is needed to render
viable parcels.
009-180-036-000 Commercial
improved
Industrial 0.34 $2,254,000 $766,360 Alignment doesn't appear to intersect with existing structures.

Est. acreage assumes alignment
only.
009-180-039-000 Commercial
improved
Industrial 0.1 $2,254,000 $225,400 Alignment doesn't appear to intersect with existing structures.

Est. acreage assumes alignment
only.

TOTAL SEGMENT 1 1.27 $2,389,240
009-180-035-000 Retail Service Commercial 0.36 $2,254,000 $811,440 Alignment doesn't appear to intersect with existing structures.

Est. acreage assumes alignment
only.
009-180-040-000 Commercial
improved
Mixed-Use 0.19 $2,254,000 $428,260 Clif Family Winery lot; alignment appears to intentionally avoid
intersecting with Enoteca
building. Est. acreage assumes
alignment only.
009-180-041-000 Commercial
improved
Mixed-Use 0.94 $2,254,000 $2,118,760 Alignment doesn't appear to intersect with existing structures.

Est. acreage assumes more land
than alignment is needed to
render viable parcels.
009-180-027-000 Single-Family
Residential
High-Density
Residential

0.52 $2,254,000 $1,172,080 Alignment intersects with existing structures. Est. acreage assumes
entire parcel is needed.

TOTAL SEGMENT 2 2.01 $4,530,540

ASSUMPTIONS
Segment 1: Mitchell Drive to Charter Oak Ave
Segment 2: Charter Oak Avenue to Grayson Avenue
December 22, 2025
Toole Design and Economic & Planning Systems (EPS)
St. Helena Streets Master Plan
Re: Oak Avenue Extension Acquisition Estimate

1. Assumed land values on a per-acre basis are informed by the Economic & Planning Systems (EPS) analysis memorandum delivered on December 17, 2025, and are used as inputs for planning-level cost estimation rather than site-specific appraisals.

2. The assumed right-of-way (ROW) width of 60 feet reflects the conceptual design identified in the 2001 Highway 29 Specific Plan and is used as a consistent planning assumption for estimating potential acquisition needs.

3. Where the proposed alignment is anticipated to divide a parcel such that the remaining portion would likely not support development or economically viable use, the estimate assumes acquisition of both the ROW area and the additional remainder area that is presumed to be unviable for development.

4. Where the alignment is not expected to impair the parcel’s ability to support reasonable economic use, the acquisition estimate assumes only the land area within the conceptual 60-foot ROW, calculated based on the length of the alignment through the parcel.

5. Judgments regarding the potential viability of remainder parcels are made at a conceptual, planning level for the purpose of estimating costs only and do not constitute legal determinations.

6. Land values reflect prevailing market conditions for broadly comparable properties in St. Helena at the time of analysis and are presented in current (noninflated) dollars.

7. The acquisition estimate includes land acquisition only and excludes improvements, relocation assistance, utility relocation, environmental mitigation, legal costs, and construction-related expenses.

Page 194 of 1051 ends

Memorandum
To: Anjulie Palta, Toole Design Group
From: Jason Moody and Rosanna Ren, Economic & Planning Systems Subject: St. Helena Right-of-Way Land Acquisition Cost Estimates EPS #251075
Date: December 17, 2025
This memorandum summarizes the methodology and resulting estimates for right-of-way land acquisition costs needed for the Oak Avenue extension project proposed in the St.

Helena Streets Master Plan. The analysis has been prepared by Economic & Planning Systems (EPS) as part of a consultant team led by Toole Design Group and retained by the City of St. Helena to prepare the Streets Master Plan.

The proposed Oak Avenue extension improvements included in the Plan would connect Mitchell Drive to Grayson Avenue, running parallel to Highway 29, and require the acquisition of several largely undeveloped land parcels. EPS estimated the likely land acquisition costs based on readily available data of comparable sales in the region. The information is designed to support the planning process and does not constitute a formal appraisal for any specific site.

Summary of Results
Table 1 below summarizes the sites used as comparables for the cost estimate and their approximate land sale value in 2025 dollars. On average, land value is estimated at $2,254,000 per acre, with a likely range of $2.1 million to $2.4 million per acre. The estimates are based on 33 land sale comparables going back to 2020 but have been adjusted for inflation and are reported in 2025 dollars.

Page 195 of 1051 ends

St. Helena Right-of-Way Land Acquisition Cost Estimates

Page 2 ends

Table 1 Summary of CoStar and City Land Appraisal Comparables and Average Land Sale Value
Land Use Description
Number of
Sites Location
Est. Land Sale Price
per Acre (2025$)1
CoStar Averages of Prior Land Sales in St. Helena (2020-2025) Agricultural 19 sites St. Helena $2,363,000
Commercial 4 sites St. Helena $313,000
Residential 3 sites St. Helena $2,061,000
Average of All Costar Sites 26 sites St. Helena $2,013,000 Comparables from City Land Appraisals2
Commercial3,4 St. Helena $3,289,000
Commercial4 Napa $2,798,000
Commercial3 Napa $3,383,000
Commercial3,4 Healdsburg $2,593,000
Commercial3,4 Yountville $3,516,000
Commercial3 Napa $4,168,000
Residential4 St. Helena $2,293,000
Average of City Land Appraisals $3,149,000
Combined Average of Costar and City Appraisal Comparables Agricultural 19 sites $2,363,000
Commercial 10 sites $2,100,000
Residential 4 sites $2,119,000
Average of All Comparables 33 sites $2,254,000
Source: Bureau of Labor Statistics; City of St. Helena; CoStar Group; Economic & Planning Systems [1] Removes the cost of improvements, if any, based on the proportion of improvements in the parcel's assessed value. All sale data are presented on a per-acre basis and adjusted to 2025 dollars based on the BLS Consumer Price Index. Values are rounded to nearest thousand.
[2] Sale comparables for city land appraisals included eight unique sites. EPS removed one outlier site, valued at $12.7 million per acre.
[3] Comparable was cited in appraisal report of the St. Helena Police Station and City Hall (1480 Main St), which estimated the value at $4,950,000, or $6,973,000 per acre in 2025 dollars. [4] Comparable was cited in appraisal report of vacant commercially zoned Adams St/Library Ln site, which estimated the value at $18,300,000, or $3,448,000 per acre in 2025 dollars.

Page 196 of 1051 ends

Economic & Planning Systems, Inc.

Page 3 ends

Data Sources and Methodology
EPS evaluated property sales data from available data sources to estimate the likely “arms-length” purchase price to acquire the necessary right-of-way for the Oak Avenue extension project. Based on the City’s zoning map, the proposed Oak Avenue extension runs through land zoned High-Density Residential, Service Commercial, Public/QuasiPublic, Industrial, and Mixed-Use. As a result, EPS considered property sales covering agricultural, commercial (including mixed-use), and residential land uses, from the following sources:
• CoStar Data: EPS reviewed property sales from the CoStar Group, a subscriptionbased commercial real estate database covering both residential and commercial transactions. CoStar identified 26 land sale transactions in St. Helena from 2020 to 2025.
• Recently Completed Appraisal Reports: The City provided EPS with two land appraisal reports, which included a sample of six comparable sales in Sonoma County and Napa County.1
To ensure “apples-to-apples” comparison of land sales of different sizes and across different years, EPS converted all sale prices to 2025 dollars (adjusted using the Consumer Price Index) and presented values on a per-acre basis. Recognizing that several of the transactions included sites with structural improvements that likely affected the sale value, EPS made further adjustments to estimate the portion of the sale price that accounts for the land value only. This was estimated using assessed value data from the Napa County Assessor’s Office, by taking the percentage of the AV that is the land value for each parcel and applying it to the sale price.
1 EPS removed two additional sites from analysis: One outlier which estimated a land value of $12.7 million per acre and another site for which assessed value data was not available.

Page 197 of 1051 ends

St Helena Streets Master Plan
Appendix F
Synchro Analysis for
Key Extension and
Bridge Projects

Page 198 of 1051 ends

429 1st St, Unit 110, Petaluma, CA 94952
Memorandum
Date: March 2, 2026
To: Anju Palta, Toole Design Group
From: Ian Barnes, PE, and Gillian Zhao, Fehr & Peers
Subject: Saint Helena Streets Master Plan Roadway Project Alternatives Analysis Executive Summary
This technical memorandum presents the transportation operations analysis for the proposed roadway project alternatives (hereafter referred to as “study alternatives”) under the Saint Helena Streets Master Plan. The Streets Master Plan project team considered three roadway project alternatives for transportation operations analysis. The goal is to reduce congestion along State Route 29/State Route 128/Main Street (hereafter referred to as “Main Street”), provide additional connections within the City, and support the other goals of the Streets Master Plan. The additional connections will enhance emergency response by providing additional access routes and adding redundancy for emergency vehicle routing. The dispersal of motor vehicle volumes will improve the multimodal environment and provide a more comfortable experience for all users. The roadway project alternatives will incorporate traffic calming measures and signage to reinforce the intended functions of the new connections per the Streets Master Plan.

The study alternatives include the following:
• Adams Street extension from its current eastern terminus at 899 Adams Street to Silverado Trail via a new bridge over the Napa River
• Oak Avenue extension between Mitchell Drive and either Grayson Avenue or Charter Oak Avenue (two southern terminus options), including a new bridge over Sulphur Creek • Pope Street Bridge improvements across the Napa River, which also includes realignment of Pope Street to meet Silverado Trail and Howell Mountain Road at a single intersection Fehr & Peers performed operations analysis using the Synchro 12 software, which considers traffic volumes, lane configurations, signal timings, and other pertinent design, traffic volume, and operational parameters contributing to intersection operations. Study intersections were analyzed using procedures and methodologies contained in the Highway Capacity Manual, 7th Edition (Transportation Research Board, 2022). Intersection operations Levels of Service (LOS) during the weekday morning (AM), weekday evening (PM), and weekend midday (MD) peak hours were evaluated to assess each study alternative’s effect on intersection operations across the City. More detailed information is presented in the Procedures and Methodologies section.

Results show that, as the new street connections and improvements provide alternative routes for travelers, providing varying levels of congestion reductions on Main Street and throughout the City.

Page 199 of 1051 ends

Saint Helena Streets Master Plan Roadway Project Alternatives Analysis | 2 Among the alternatives, the Oak Avenue extension (Grayson Avenue terminus) alternative offers the greatest benefit in traffic operations, followed by the Adams Street extension alternative and Oak Avenue extension (Charter Oak Avenue terminus) alternative as they offer similar congestion reduction benefits. The Pope Street Bridge improvement alternative provides more modest benefits along Main Street. Table 1 is organized into two parts that summarize the LOS results at key intersections. Table 1A presents the LOS results under Existing Conditions, Cumulative No Project, Adams Street Extension Alternative and Pope Street Bridge Improvement Alternative. Table 1B summarizes the LOS results under Oak Avenue Extension Alternative (Grayson Avenue terminus) and Oak Avenue Extension Alternative (Charter Oak Avenue terminus).

Page 200 of 1051 ends

Saint Helena Streets Master Plan Roadway Project Alternatives Analysis | 3 Table 1A. Intersection LOS at Key Intersections
Int. ID Intersection
Existing Traffic Control
Peak Hour
Existing Conditions Cumulative Conditions
No Project No Project Adams Street Extension Pope Street Bridge Improvement Delay (s) LOS Delay (s) LOS Delay (s) LOS Delay (s) LOS 10 Main Street/Madrona Avenue-Fulton Lane
Signal
Weekday AM 18.0 B 49.0 D 49.0 D 49.0 D
Weekday PM 14.4 B 25.3 C 25.3 C 25.3 C
Weekend MD 33.5 C 33.6 C 25.4 C 33.6 C
12 Main Street/Adams Street
Signal
Weekday AM 22.5 C 35.2 D 38.1 D 35.2 D
Weekday PM 23.6 C 34.3 C 44.1 D 34.3 C
Weekend MD 41.9 D 59.2 E 41.1 D 59.2 E
18 Main Street/Pope Street-Mitchell Drive
Signal
Weekday AM 115.6 F >120 F 71.7 E >120 F
Weekday PM 97.8 F >120 F 75.6 E >120 F
Weekend MD 100.5 F 109.3 F 66.1 E 93.4 F
19 Main Street/Grayson Avenue
Signal
Weekday AM 37.6 D 68.5 E 48.9 D 65.0 E
Weekday PM 19.6 B 52.9 D 42.4 D 50.8 D
Weekend MD 23.4 C 28.7 C 19.8 B 25.5 C
26 Silverado Trail/Pope Street SSSC*
Weekday AM 3.7 (18.8) A (C) 9.6 (54.8) A (F) 9.3 (66.7) A (F) 38.2 D Weekday PM 3.3 (19.4) A (C) 25.6 (>120) D (F) 24.3 (>120) C (F) 53.4 D Weekend MD 2.1 (14.3) A (B) 2.9 (20.2) A (C) 2.4 (23.4) A (C) 23.4 C 28 Main Street/Charter Oak Avenue
SSSC
Weekday AM 5.3 (>120) A (F) 36.4 (111.6) E (F) 22.7 (71.0) C (F) 33.7 (103.0) D (F) Weekday PM 6.9 (119.2) A (F) 48.4 (>120) E (F) 33.8 (99.1) D (F) 45.8 (>120) E (F) Weekend MD 5.3 (89.3) A (F) 19.0 (>120) C (F) 10.7 (>120) B (F) 17.8 (>120) C (F) 34 Silverado Trail/Adams Street Signal
Weekday AM
Intersection Does Not Exist in
this Scenario
Intersection Does Not Exist in
this Scenario

18.1 B
Intersection Does Not Exist in
this Scenario Weekday PM 17.9 B
Weekend MD 14.6 B
Notes: *Silverado Trail/Howell Mountain Road-Pope Street has been modeled as one signalized intersection under the Pope Street Bridge Improvement Alternative Scenario as an operational improvement. The county may also consider converting this intersection to a roundabout as described in the Napa County General Plan. 1. Delay for signalized and all-way stop-controlled intersections presented as whole-intersection average delay. Delay for side-street stop-controlled intersections presented as whole-intersection average delay (delay on worst movement or single-lane approach).

2. LOS per Highway Capacity Manual, 7th Edition.

3. Bold indicates unacceptable operations.

4. AWSC = All-Way Stop-Controlled, SSSC = Side-Street Stop-Controlled.

5. Oak Avenue Extension LOS results presented in Table 1B.

Source: Fehr & Peers, 2026.

Page 201 of 1051 ends

Saint Helena Streets Master Plan Roadway Project Alternatives Analysis | 4 Table 1B. Intersection LOS at Key Intersections (Oak Avenue Extension) Int. ID Intersection
Existing Traffic Control
Peak Hour
Cumulative Conditions
Oak Avenue Extension
Grayson Avenue Terminus Charter Oak Avenue Terminus
Delay (s) LOS Delay (s) LOS
10 Main Street/Madrona Avenue- Fulton Lane Signal
Weekday AM 54.0 D 57.1 E
Weekday PM 34.8 C 34.5 C
Weekend MD 27.5 C 27.5 C
12 Main Street/Adams Street Signal
Weekday AM 35.3 D 35.8 D
Weekday PM 37.2 D 37.7 D
Weekend MD 37.6 D 37.6 D
18 Main Street/Pope Street-Mitchell Drive Signal
Weekday AM 63.5 E 81.3 F
Weekday PM 68.9 E 78.7 E
Weekend MD 63.6 E 68.9 E
19 Main Street/Grayson Avenue Signal
Weekday AM 38.6 D 71.9 E
Weekday PM 43.0 D 55.6 E
Weekend MD 24.3 C 29.3 C
26 Silverado Trail/Pope Street SSSC
Weekday AM 9.6 (54.8) A (F) 9.6 (54.8) A (F)
Weekday PM 25.6 (>120) D (F) 25.6 (>120) D (F)
Weekend MD 2.9 (20.2) A (C) 2.9 (20.2) A (C)
28 Main Street/Charter Oak Avenue SSSC**
Weekday AM 16.7 (56.3) C (F) 31.1 C
Weekday PM 27.0 (78.2) D (F) 29.8 C
Weekend MD 11.3 (>120) B (F) 27.6 C
35 Oak Avenue/ Grayson Avenue SSSC
Weekday AM 4.9 (13.2) A (B)
Weekday PM 3.8 (11.7) A (B) Intersection Does Not Exist in this Scenario Weekend MD 3.7 (9.9) A (A)
36 Oak Avenue/Charter Oak Avenue SSSC
Weekday AM 3.7 (12.7) A (B) 4.0 (10.2) A (B)
Weekday PM 4.0 (12.0) A (B) 3.6 (9.9) A (A)
Weekend MD 5.1 (11.3) A (B) 3.5 (10.0) A (A)
Notes: ** Main Street/Charter Oak Avenue has been modeled as one signalized intersection under the Oak Avenue Extension (Charter Oak Avenue terminus) Alternative Scenario as an operational improvement.

1. Delay for signalized and all-way stop-controlled intersections presented as whole-intersection average delay. Delay for side-street stop-controlled intersections presented as whole-intersection average delay (delay on worst movement or single-lane approach).

2. LOS per Highway Capacity Manual, 7th Edition.

3. Bold indicates unacceptable operations.

4. AWSC = All-Way Stop-Controlled, SSSC = Side-Street Stop-Controlled.

Source: Fehr & Peers, 2026.

Page 202 of 1051 ends

Saint Helena Streets Master Plan Roadway Project Alternatives Analysis | 5 The Adams Street extension alternative would make the Silverado Trail and Adams Street route combination a more attractive route versus No Project conditions. As shown in Table 1A, it would result in a rerouting of traffic volumes and provide congestion reductions at key intersections along Main Street, including Main Street/Pope Street-Mitchell Drive and Main Street/Grayson Avenue. While traffic volumes would increase at locations such as Main Street/Adams Street and Silverado Trail/Pope Street, these intersections are generally expected to operate at a LOS similar to the No Project scenario. The new Silverado Trail/Adams Street intersection meets traffic signal warrant requirements and is expected to operate at LOS B with traffic signal installation, and would operate similarly well if a roundabout is implemented in lieu of a traffic signal. In addition to the congestion reduction benefit, the extension is envisioned to include a shared-use path for pedestrians and bicyclists to support bicycle and pedestrian connectivity throughout the City.

The Pope Street Bridge improvement alternative would improve motorists’ driving experience on the Pope Street Bridge; therefore, it is assumed this alternative will entice more drivers to use the Silverado Trail and Pope Street route. However, because these travelers would still need to navigate existing intersections that are congested, the diversion potential is smaller than the Adams Street alternative. As shown in Table 1A, the Pope Street Bridge improvement alternative would provide modest congestion reductions at key intersections along Main Street including Main Street/Pope Street-Mitchell Drive and Main Street/Grayson Avenue. While traffic volumes would increase at intersections along Pope Street, these intersections are generally expected to continue to operate at a LOS similar to No Project conditions. However, it is noted some intersections, such as Pope Street/Starr Avenue, will need complementary improvements (e.g., traffic control configurations such as all-way stop-control) to operate at LOS C or better. The Silverado Trail/Pope Street-Howell Mountain Road intersection meets traffic signal warrant requirements and is expected to operate at LOS D or better with traffic signal installation, and would operate similarly well if a roundabout is implemented in lieu of a traffic signal. In addition to vehicle circulation improvements, the Pope Street Bridge improvement would provide upgrades to pedestrian and bicyclists facilities to strengthen the multimodal network.

The Oak Avenue extension alternative would provide a new roadway connection parallel to the most congested segments along Main Street. As shown in Table 1B, both the Grayson Avenue terminus and the Charter Oak Avenue terminus alternative would reduce traffic volumes at key intersections along Main Street, including Main Street/Pope Street-Mitchell Drive. While traffic volumes would increase at intersections along Oak Avenue, the affected intersections are expected to operate at LOS C or better. Specifically, key intersections along the extended segment of Oak Avenue, including Oak Avenue/Grayson Avenue and Oak Avenue/Charter Oak Avenue, are expected to operate at LOS C or better with side-street stop-controlled configurations. The intersections along the existing segment of Oak Avenue between Madrona Avenue and Grayson Avenue are expected to operate at LOS C or better with their existing stop control configurations (i.e. all-way stop-controlled and side-street stop-controlled). Under the Charter Oak Avenue terminus alternative, the Main Street/Charter Oak Avenue intersection meets traffic signal warrant requirements and is expected to operate at LOS C with traffic signal installation. While the traffic volumes would increase at locations along Oak Avenue, the overall volume along the corridor is expected to remain low to moderate. Wayfinding signages would be provided to improve driver awareness of the connection to key community locations, and the corridor would incorporate traffic calming measures to manage operating speeds and support a livable, multimodal street environment.

All study alternatives would allow drivers to utilize alternative routes and thus reduce congestion along Main Street within the City of Saint Helena. The Oak Avenue extension (Grayson Avenue

Page 203 of 1051 ends

Saint Helena Streets Master Plan Roadway Project Alternatives Analysis | 6 terminus) alternative provides the highest congestion reduction benefits across the study alternatives, as it provides the shortest re-route from Main Street, and enables drivers to travel on a route directly parallel to Main Street. The Oak Avenue extension (Charter Oak Avenue terminus) alternative also provides congestion reduction benefits. However, compared to the Grayson Avenue terminus alternative, the congestion reduction benefits are more modest because the extension will be shorter distance and drivers would still experience delays south of Charter Oak Avenue along Main Street before turning on to Oak Street. The Adams Street extension alternative provides the second highest congestion reduction benefits, as it provides a high-quality route to directly bypass congestion along Main Street. The Pope Street Bridge alternative offers a more comfortable driving experience for drivers willing to take the combination of Silverado Trail and Pope Street; however, drivers would still experience delays north of Pope Street along Main Street. By reducing vehicle demand and providing congestion reductions along Main Street, the study alternatives would also improve the multimodal environment, making the travel experience for all users more comfortable and safer.

Additional descriptions are provided in the Operations Assessment section. Appendix A presents the delays and LOS for all study intersections for reference. Appendix B presents the collected counts.

Appendix C presents the calculations worksheets.

Page 204 of 1051 ends

Saint Helena Streets Master Plan Roadway Project Alternatives Analysis | 7 Introduction
This technical memorandum presents the transportation operations analysis for the street extension and/or improvement study alternatives under the Saint Helena Streets Master Plan. The operations assessment for the City’s General Plan Update 2040 was completed in 2018; the Saint Helena General Plan Update 2040 (hereafter referred to as “General Plan”) was adopted in 2019. The analysis builds upon the transportation operations analysis and traffic operations analysis models prepared for the adopted General Plan and has been prepared in a manner consistent with the traffic operations analysis for the adopted General Plan and Environmental Impact Report (EIR). The work updated the Synchro traffic operations analysis model developed for the General Plan, incorporates revised traffic volume forecasts reflecting the roadway project build-out scenarios, and summarizes the traffic operations results of study alternatives.

Project Description
The existing transportation infrastructure and development pattern in the City of Saint Helena supports a walkable community and provides access to local and regional destinations. However, the City faces challenges including congestion along Main Street, limited low-stress multimodal options for residents and visitors, and intersection LOS grades that frequently fall below the standards set forth in the General Plan. The Saint Helena Streets Master Plan (hereafter referred to as “Streets Master Plan”) project aims to produce a conceptual design plan for the transportation network throughout the City, except for the Downtown Specific Plan (“DSP”) area. The Streets Master Plan will enhance and supplement the City’s circulation element goal of encouraging development of a multimodal transportation network and supportive land use decisions to boost alternative modes of transportation.

At the direction of the City, the Streets Master Plan project team considered three street extension alternatives for transportation operations analysis. The goal is to reduce traffic demand on Main Street and provide additional connections within the City. The additional connections will enhance emergency planning and response by providing additional access routes and adding redundancies for emergency vehicles. The study alternatives include the following:
• Adams Street extension from its current eastern terminus at 899 Adams Street to Silverado Trail via a new bridge over the Napa River
• Oak Avenue extension between Mitchell Drive and either Grayson Avenue or Charter Oak Avenue (two southern terminus options), including a new bridge over Sulphur Creek • Pope Street Bridge improvements across the Napa River, which also includes realignment of Pope Street to meet Silverado Trail and Howell Mountain Road at a single intersection Figure 1 presents the study intersections and proposed extensions.

Page 205 of 1051 ends

Spring St Spring St
Spring Mountain RdSpring Mountain Rd
Meadowood Ln Meadowood Ln
Pratt AvePratt Ave
Inglewood Ave Inglewood Ave
Pope St Pope St
Grayson AveGrayson Ave
Chaix Ln Chaix Ln
White Ln White Ln
Dowdell Ln Dowdell L
M
n
ills Ln Mills Ln
Stice Ln Stice Ln
Fulton Ln Fulton Ln
Lewelling Ln Lewelling Ln
Crane AveCrane Ave
Vallejo StVallejo St
Mitchell DrMitchell Dr
Hunt AveHunt Ave
Conn Valley RdConn Valley Rd
Taplin RdTaplin Rd
St. Helena
Thoman
Barro
Zinfandel
Zinfandel Ln
29 128
Silverado Trl N
Elmhurst
Ave
Hillview Pl
Madrona Ave
Sulphur Springs Ave
Adams St
Charter Oak Ave
Spring St
Railroad Ave
Library Ln
Starr Ave
College Ave
Oak Ave
Hudson Ave
Valley View St
Deer Park Rd
Silverado Trl S
S Howell Mountain RdS Howell Mountain Rd
35 34
32 33
31 30
29 28
27 26
25 24
23 22
21 20
19 18 17
16 15
14 13 12
11 10
9 8
7 6
5 4 36
3 2 1
Project Site Vicinity and Study Intersection Locations
FIGURE 1
0 1 2
Miles
Study Intersection Oak Avenue Extension Scenario Study Intersection (Grayson Avenue Terminus)
Adams Street Extension Scenario
Study Intersection
Pope Street Improvement Scenario
Study Intersection
# 34 25
Oak Avenue Extension Scenario Study Intersection Adams Street Extension (Charter Oak Avenue Terminus)
Pope Street Bridge Improvement
35/36
36

Page 206 of 1051 ends

Saint Helena Streets Master Plan Roadway Project Alternatives Analysis | 9 Procedures and Methodologies
The study intersections were analyzed using procedures and methodologies contained in the Highway Capacity Manual, 7th Edition (Transportation Research Board, 2022). These methodologies were applied using Synchro 12 software, which considers traffic volumes, lane configurations, signal timings, and other pertinent design, traffic volume, and operational parameters contributing to intersection operations.

The following describes specific inputs, model parameters, and other aspects of Synchro modeling based on data collection efforts.
• Peak hour volumes collected at the study intersections in 2024 and 2025 were used for Existing Conditions. Local schools were in session and weather conditions were clear when the data was collected. Appendix B presents the collected counts.
• Volume forecasts were based on the General Plan transportation operations analysis buildout forecasts. For the study alternatives, forecasts were developed using output from the most appropriate version of the Solano-Napa Activity Based Model (SNABM). Specifically, the output was used to determine shifts in traffic volumes throughout the City resulting from the study alternatives, along with manual adjustments informed by travel time and traffic volume elasticity assessments.
• Intersection configurations were entered based on aerial imagery and anticipated complementary improvements.
• The observed existing conditions weekday morning, weekday evening, and weekend midday peak hour factor (PHF), which is a measure of peaking of traffic volumes during the busiest 15- minutes of the peak hour (lower values represent more peaking) at each intersection, was used. • The observed weekday morning, weekday evening, and weekend midday peak hour heavy vehicle percentage (HVP) at each intersection was used. Observed bicycle and pedestrian volumes were used. However, in cases where the HVP was two percent or less, a minimum of three percent was applied to account for potential variations in vehicle composition.

Level of Service Definition
This study analyzes intersection operations using automobile delay and LOS as the primary measure of performance. Automobile LOS is a qualitative description of traffic flow from the perspective of motorists. The Highway Capacity Manual, 7th Edition (HCM) defines six levels of service, from LOS A representing the least congested traffic conditions to LOS F representing the most congested traffic conditions. These grades represent the perspective of drivers and are an indication of the comfort and convenience associated with driving, as well as speed, travel time, traffic interruptions, and freedom to maneuver.

The HCM methodology determines the LOS at intersections by calculating the weighted average delay per vehicle. At unsignalized side-street stop-controlled intersections, LOS is also reported for the worst approach. Table 2 displays LOS criteria for both signalized and unsignalized intersections.

Page 207 of 1051 ends

Saint Helena Streets Master Plan Roadway Project Alternatives Analysis | 10 Table 2. Intersection Level of Service (LOS) Definitions Level of
Service
LOS Criteria (Delay in Seconds)
Signalized Intersections Unsignalized Intersections
A ≤ 10.0 ≤ 10.0
B >10.0 to 20.0 >10.0 to 15.0
C >20.0 to 35.0 >15.0 to 25.0
D >35.0 to 55.0 >25.0 to 35.0
E >55.0 to 80.0 >35.0 to 50.0
F >80.0 >50.0
Source: Highway Capacity Manual, 7th Edition, Transportation Research Board.

Intersection Substantial Operational Effect Criteria
Intersection operations LOS was evaluated to assess the study alternatives’ effect on intersection operations and identify the potential need for enhancements to the transportation network. Based on the Transportation Performance Measures of the adopted General Plan, the City has augmented performance measures to look beyond the traditional automobile LOS for the purpose of developing a meaningful nexus to improve multimodal circulation and provide congestion reductions. However, for the purpose of evaluating intersection operations for automobile LOS to illustrate the operational effect between study alternatives, thresholds consistent with the Saint Helena General Plan Update 2035 (April 2016), the Saint Helena General Plan Update 2040 Environmental Impact Report (October 2018), and the Napa County General Plan (February 2019) were used to inform if the study alternatives would result in unacceptable operations. In City of Saint Helena, the standard is LOS C for signalized and unsignalized intersections, except along Main Street where LOS D for signalized intersections shall be permitted. For intersections outside the City of Saint Helena boundary, the standard is LOS D at signalized intersections. Complementary improvements (e.g., traffic control configurations such as traffic signal or roundabout) were tested at key new intersections with the study alternatives.

Signal Warrant Analysis
The peak hour signal warrants (Warrant 3A and Warrant 3B) from the Manual on Uniform Traffic Control Devices (MUTCD) were used to determine if a traffic signal is warranted at the new intersections.1
The warrants are based on volumes under cumulative conditions with respective study alternatives.
1 Warrant 3A and 3B are more rigorous than warrant 4C and were therefore selected as the basis for the signal warrant analysis. While the community’s population falls below the typical thresholds for 3A and 3B, applying these warrants at the planning level provides a more conservative analysis. This is especially relevant given the community’s tourist population, where seasonal and visitor traffic can result in volumes that exceed what the resident population alone would suggest.

Page 208 of 1051 ends

Saint Helena Streets Master Plan Roadway Project Alternatives Analysis | 11 Operations Assessment
Existing Conditions
Fehr & Peers performed operations analysis for intersections under Existing Conditions, based on the traffic volumes and lane configurations shown in Figure 2. The analysis found that while most intersections operate acceptably under Existing Conditions, intersections that operate unacceptably during at least one peak hour include the following:
• Main Street/Pratt Avenue
• Main Street/Elmhurst Avenue
• Main Street/Pope Street-Mitchell Drive
• Main Street/Charter Oak Avenue
• Main Street/Spring Street
A summary table presenting the delays and LOS for all study intersections is provided in Appendix A for reference.

Page 209 of 1051 ends

Existing Conditions Peak Hour Intersection Traffic Volumes, Lane Configurations and Traffic Control FIGURE 2
6 (4) [3]
18 (13) [7]
24 (33) [18]
3 (9) [3]
30 (18) [12]
44 (12) [12]

4. Hudson Ave/Madrona Ave
24 (17) [23]
207 (62) [64]
38 (41) [28]
19 (22) [29]
41 (27) [24]
165 (59) [25]

5. Valley View St/Spring St
103 (51) [66]
34 (10) [19]
64 (91) [52]162 (20) [8]
133 (33) [23]
20 (43) [13]

6. Valley View St/Crane Ave/Grayson Ave
5 (2) [5]
3 (3) [4] 3 (2) [1] 63 (57) [49]
119 (48) [38]
14 (3) [5]

7. Crane Ave/Sulphur Spring Ave
6 (5) [14]
650 (737) [625]
27 (17) [22]
0 (1) [5]
0 (1) [1]
2 (12) [8] 1 (2) [5] 636 (539) [584] 19 (22) [11]
19 (20) [12]
0 (1) [0]
30 (20) [20]

8. Main St/Pratt Ave
54 (27) [20]
650 (731) [630]
33 (28) [31]
43 (22) [25] 79 (16) [23] 589 (555) [589]

9. Main St/Elmhurst Ave
34 (16) [13]
556 (510) [503]
9 (5) [5]
86 (83) [73]
34 (34) [15]
31 (24) [31] 103 (37) [48] 459 (500) [525] 70 (40) [41] 62 (165) [74]
47 (27) [17]
11 (7) [4]

10. Main St/Madrona Ave/Fulton Ln
99 (174) [91]
11 (10) [4]
20 (14) [7]
95 (63) [48]
17 (24) [8]
6 (11) [6]

11. Railroad Ave/Fulton Ln
Madrona Ave Grayson Ave
Valley View St Crane Ave
Sulphur Spring Ave
Crane Ave
Pratt Ave
Main St
Elmhurst Ave
Main St
Madrona Ave Fulton Ln
Main St
Fulton Ln
Railroad Ave
37 (23) [17]
523 (425) [451]
39 (34) [24]
47 (68) [38]
80 (62) [33]
21 (18) [26] 24 (31) [26] 446 (444) [500] 31 (56) [34]
29 (38) [32]
39 (53) [32]
26 (55) [29]

12. Main St/Adams St
Adams St
Main St
65 (30) [38]99 (67) [46]
28 (26) [9]
18 (19) [7]
57 (93) [33]
58 (53) [53] 15 (19) [6] 57 (55) [34] 46 (38) [32]
26 (85) [47]
32 (91) [33]
6 (32) [8]

13. Railroad Ave/Adams St
Adams St
Railroad Ave
6 (23) [3]
0 (0) [0]2 (0) [0]
18 (27) [19]
45 (23) [7]
26 (15) [1] 3 (24) [11] 1 (1) [0] 0 (0) [0]
1 (1) [0]
19 (46) [8]
0 (0) [0]

14. Library Ln/Adams St
583 (458) [473]
66 (79) [58]
467 (491) [534]26 (26) [21]
16 (24) [19]
21 (26) [15]

15. Main St/Hunt Ave
7 (8) [4]
64 (50) [19]24 (40) [31]
37 (27) [29]
47 (59) [32]
8 (12) [15] 15 (19) [11] 33 (59) [29] 72 (70) [44]
101 (53) [48]
20 (20) [17]
33 (55) [26]

16. Railroad Ave/Church St/Hunt Ave
23 (11) [10]
17 (14) [0] 7 (15) [8] 106 (104) [83]
44 (65) [60]
27 (38) [24]

17. Oak Ave/Mitchell Dr
67 (77) [85]
584 (497) [513]
39 (52) [43]
140 (149) [131] 3 (11) [4] 443 (438) [508] 87 (88) [51] 147 (94) [60]
33 (27) [21]
159 (129) [97]

18. Main St/Mitchell Dr/Pope St
Adams St
Library Ln
Hunt Ave
Railroad Ave Church St
Mitchell Dr
Oak Ave
Mitchell Dr Pope St
Main St
51 (26) [34]
710 (667) [721]
92 (30) [19]
56 (29) [25] 93 (55) [18] 679 (696) [739]

19. Main St/Grayson Avenue
94 (43) [32]
751 (684) [748]
10 (9) [7]
55 (63) [45] 26 (14) [12] 709 (711) [752]

20. Main St/Sulphur Springs Ave
56 (34) [29]
9 (15) [4]
7 (16) [6]
58 (57) [39]
25 (6) [3]
9 (5) [5]

21. Starr Ave/Hunt Ave
16 (25) [14]
160 (155) [146] 22 (10) [9] 53 (58) [29]
47 (37) [31]
312 (169) [169]

22. Starr Ave/Pope Street
117 (42) [21]
1 (2) [2]
43 (11) [7]
8 (21) [21]
93 (157) [107]
107 (33) [22] 19 (18) [15] 0 (1) [2] 10 (2) [3]
2 (5) [8]
215 (144) [171]
84 (14) [13]

23. Paseo Grand Dr/College Ave/Pope Street
Grayson Avenue
Main St
Hunt Ave
Starr Ave
Pope Street
Starr Ave
Pope Street
Paseo Grand Dr College Ave
Hunt Ave
Main St
Sulphur Springs Ave
Main St
Spring St
24 (9) [15]
433 (382) [388]
4 (2) [3]
20 (33) [18] 9 (11) [10] 436 (573) [408]

24. Silverado Trail/Pratt Ave
453 (372) [394]
48 (10) [24]
436 (601) [423]20 (5) [3]
4 (19) [9]
17 (18) [21]

25. Silverado Trail/Howell Mountain Rd
141 (62) [75]
405 (319) [364]
96 (63) [54]
65 (109) [46] 146 (104) [116] 307 (515) [328]

26. Silverado Trail/Pope Street
Pratt Ave
Silverado Trail
Howell Mountain Rd
Silverado Trail
Pope Street
Silverado Trail
0 (0) [0]
799 (696) [738]
3 (1) [2]
0 (0) [0]
0 (0) [0]
0 (1) [1] 3 (7) [1] 771 (750) [756] 2 (4) [9]
7 (7) [6]
0 (0) [0]
1 (0) [0]

27. Main St/Mills Ln
Mills Ln
Main St
16 (9) [14]
679 (597) [605]
111 (97) [125]
7 (13) [12]
2 (6) [8]
3 (19) [28] 22 (8) [8] 712 (684) [694] 8 (24) [34]
4 (16) [24]
1 (0) [2]
61 (58) [44]

28. Main St/Charter Oak Ave
3 (1) [3]
53 (65) [71]
16 (19) [9]
2 (1) [0]
4 (2) [1]
4 (5) [0] 2 (2) [0] 104 (65) [51] 11 (4) [2]
10 (5) [1]
6 (1) [4]
24 (20) [10]

29. Oak Ave/Pine St
22 (15) [8]
60 (67) [64]65 (96) [62]
8 (7) [2]
54 (29) [19]
57 (27) [4] 17 (4) [2] 93 (81) [44] 18 (16) [7]
22 (15) [9]
40 (31) [16]
30 (44) [40]

30. Oak Ave/Adams St
12 (26) [18]64 (83) [68]
13 (11) [8]
33 (53) [25]
53 (29) [24]
33 (43) [30] 22 (35) [9] 98 (75) [54] 41 (24) [22]
65 (36) [30]
51 (58) [30]
4 (13) [16]

31. Oak Ave/Spring St
Charter Oak Ave
Main St
Adams St
Oak Ave
Spring St
Oak Ave
Pine St
Oak Ave
110 (76) [58]
621 (515) [515]
28 (22) [16]
72 (51) [43] 27 (31) [29] 461 (486) [520]

32. Main St/Spring St
2 (0) [1]0 (0) [0]1 (0) [0]
22 (36) [18]
107 (111) [80]
0 (0) [0] 46 (78) [46] 1 (0) [0] 21 (41) [19]
69 (48) [25]
276 (200) [166]
0 (0) [2]

33. Church St/Pope St
Spring St
Main St
Pope St
Church St

STOP STOP STOP
POTS
STOP
POTS
STOP
STOP
STOP

STOP STOP
STOP
STOP
STOP
STOP
POTS
STOP
STOP

POTS POTS
STOP
STOP
STOP
STOP
POTS
STOP
STOP
STOP
STOP

STOPSTOP
STOP
STOP
STOP
STOP
POTS
STOP
STOP
STOP
POTS
STOP
STOP
STOP
POTS
STOP
STOP
STOP
STOP
POTS
G
E
B
G
E
B
E
B
G
B
G
E
AE
D
AE
D
B
G
E
AE
D
AE
D
G
E
B
AE
D
AE
D
D
D
D
D
D
D
D
D
E
AC
G
D
D
D
D
B
G
CF
AE
F AE
BF
AC
G
E
AC
AF
E
G
E
B
B
G
E
BF
AE
D
AE
B
G
E
E
AC
G
AC
G
CF
D
D
AE
D
AE
D
AE
D
D
D
D
D
D
D
D
D
D
D
D
D
B
G
E
D
D
D
D
Spring St Spring St
RdRd
Meadowood Ln Meadowood Ln
Mund RdMund Rd
Pratt AvePratt Ave
Inglewood Ave Inglewood Ave
Pope St Pope St
Grayson AveGrayson Ave
Chaix Ln Chaix Ln
White Ln White Ln
Dowdell Ln Dowdell L
M
n
ills Ln Mills Ln
Stice Ln Stice Ln
Fulton Ln Fulton Ln
Lewelling Ln Lewelling Ln
Crane Ave Crane Ave
Vallejo St Vallejo St
Mitchell DrMitchell Dr
Hunt Ave Hunt Ave
Conn Valley RdConn Valley Rd
Taplin RdTaplin Rd
St. Helena
Thoman
Zinfandel
Zinfandel Ln
29 128
Silverado Trl N
Elmhurst
Ave
Hillview Pl
Madrona Ave
Sulphur Springs Ave
Adams St
Charter Oak Ave
Spring St
Railroad Ave
Library Ln
Starr Ave
College Ave
Oak Ave
Hudson Ave
Valley View St
Deer Park Rd
Silverado Trl S
S Howell Mountain RdS Howell Mountain Rd
35 34
32 33
31 30
29 28
27 26
25 24
23 22
21 20
19 18 17
16 15
14 13 12
11 10
9 8
7 6
5 4 36
0 1 2
Miles
Study Intersection
Oak Avenue Extension Scenario
Study Intersection (Grayson Ave Terminus)
Weekday AM (Weekday PM) [Weekend MD]
Peak Hour Traffic Volumes
XX (YY) [ZZ]
Oak Avenue Extension Scenario
Study Intersection (Charter Oak Ave Terminus)
#
Signalized
Intersection
STOP Stop Sign
Adams Street Extension Scenario
Study Intersection
Pope Street Improvement Scenario
Study Intersection
34 25
35/36
36

Page 210 of 1051 ends

Saint Helena Streets Master Plan Roadway Project Alternatives Analysis | 13 Cumulative Conditions
Fehr & Peers performed Cumulative Conditions intersection operations analysis based on the traffic volumes and lane configurations shown in Figure 3. Under Cumulative Conditions without study alternatives, the analysis found that, because traffic volumes are expected to grow between Existing Conditions and Cumulative Conditions, several additional intersections operate unacceptably during at least one peak hour.

Intersections that were operating unacceptably during at least one peak hour under Existing Conditions and would continue to operate unacceptably include the following:
• Main Street/Pratt Avenue
• Main Street/Elmhurst Avenue
• Main Street/Pope Street-Mitchell Drive
• Main Street/Charter Oak Avenue
• Main Street/Spring Street
In addition, the following intersections which were operating acceptably under Existing Conditions are expected to degrade to unacceptable operations during at least one peak hour under Cumulative Conditions:
• Main Street/Adams Street
• Main Street/Hunt Avenue
• Main Street/Grayson Avenue
• Main Street/Sulphur Springs Avenue
• Pope Street/Paseo Grande Drive-College Avenue
• Silverado Trail/Pratt Avenue
• Silverado Trail/Pope Street
• Main Street/Mills Lane
• Main Street/Spring Street
As the study alternatives provide new roadway connections, traffic volumes were assumed to reroute and provide various degrees of congestion reductions for Main Street. Figure 4, Figure 5, and Figure 6. Reference source not found. present the expected rerouted traffic volume under each study alternative. Figure 7, Figure 8, and Figure 9. Reference source not found. present the traffic volume and lane configuration under each study alternative. Figures for the Oak Avenue extension alternative are organized into two parts (A and B) for the Grayson Avenue terminus and Charter Oak Avenue terminus alternatives.

Page 211 of 1051 ends

Cumulative No Project Conditions Peak Hour Intersection Traffic Volumes, Lane Configurations and Traffic Control FIGURE 3
10 (10) [10]50 (60) [10]
30 (30) [30]
10 (10) [10]
40 (20) [20]
100 (70) [20]

4. Hudson Ave/Madrona Ave
40 (40) [30]
230 (220) [90]
40 (60) [40]
50 (40) [40]
30 (50) [40]
250 (160) [40]

5. Valley View St/Spring St
110 (180) [90]
60 (30) [30]
130 (160) [70]210 (70) [20]
180 (90) [30]
30 (10) [20]

6. Valley View St/Crane Ave/Grayson Ave
10 (30) [10]
10 (40) [10] 10 (20) [10] 130 (140) [70]
140 (160) [50]
20 (30) [10]

7. Crane Ave/Sulphur Spring Ave
10 (10) [20]
720 (940) [640]
40 (40) [30]
10 (10) [10]
0 (10) [10]
10 (10) [10] 10 (10) [10] 900 (690) [620] 30 (30) [20]
30 (60) [20]
0 (10) [0]
30 (50) [30]

8. Main St/Pratt Ave
50 (30) [30]
740 (920) [650]
30 (70) [40]
30 (40) [30] 130 (40) [30] 810 (710) [630]

9. Main St/Elmhurst Ave
40 (30) [20]
610 (650) [520]
20 (20) [10]
100 (120) [80]
50 (50) [20]
50 (20) [40] 110 (60) [50] 610 (610) [560] 120 (80) [50] 80 (180) [80]
60 (50) [20]
20 (20) [10]

10. Main St/Madrona Ave/Fulton Ln
120 (210) [100]
20 (10) [10]
30 (30) [10]
150 (110) [60]
20 (30) [10]
10 (10) [10]

11. Railroad Ave/Fulton Ln
Madrona Ave
Hudson Ave
Grayson Ave
Valley View St Crane Ave
Sulphur Spring Ave
Crane Ave
Pratt Ave
Main St
Elmhurst Ave
Main St
Madrona Ave Fulton Ln
Main St
Fulton Ln
Railroad Ave
50 (40) [20]
570 (550) [470]
50 (40) [30]
60 (80) [40]
90 (100) [40]
40 (30) [30] 70 (40) [40] 540 (530) [530] 70 (80) [40]
40 (70) [40]
70 (80) [40]
30 (70) [40]

12. Main St/Adams St
Adams St
Main St
80 (60) [40]
110 (90) [50]
60 (30) [10]
30 (20) [10]
100 (130) [40]
80 (90) [60] 20 (30) [10] 70 (80) [40] 60 (60) [40]
40 (100) [50]
50 (150) [40]
20 (60) [10]

13. Railroad Ave/Adams St
Adams St
Railroad Ave
10 (40) [10]
0 (0) [0]
0 (10) [0]
40 (70) [20]
90 (50) [10]
30 (10) [10] 10 (50) [20] 0 (10) [0] 0 (10) [0]
10 (0) [0]
30 (90) [10]
0 (0) [0]

14. Library Ln/Adams St
650 (600) [500]
110 (80) [70]
590 (600) [570]20 (30) [30]
20 (30) [20]
40 (60) [20]

15. Main St/Hunt Ave
10 (10) [10]10 (10) [20]10 (10) [40]
50 (30) [40]
60 (80) [40]
20 (10) [20] 10 (20) [20] 10 (10) [40] 140 (190) [50]
190 (140) [60]
40 (50) [20]
10 (10) [30]

16. Railroad Ave/Church St/Hunt Ave
30 (20) [20]
30 (30) [0] 20 (20) [10] 120 (150) [90]
60 (70) [70]
40 (50) [30]

17. Oak Ave/Mitchell Dr
80 (100) [90]
710 (630) [550]
80 (70) [50]
170 (210) [140] 10 (10) [10] 570 (570) [540] 100 (110) [60] 150 (120) [70]
40 (30) [30]
200 (160) [110]

18. Main St/Mitchell Dr/Pope St
Adams St
Library Ln
Hunt Ave
Railroad Ave Church St
Mitchell Dr
Oak Ave
Mitchell Dr Pope St
Main St
50 (70) [40]
920 (820) [770]
80 (70) [20]
70 (70) [30] 120 (60) [20] 840 (920) [810]

19. Main St/Grayson Avenue
100 (140) [40]
950 (860) [800]
20 (30) [10]
120 (140) [50] 40 (50) [20] 870 (940) [820]

20. Main St/Sulphur Springs Ave
110 (90) [40]
10 (10) [10]
20 (20) [10]
80 (100) [60]
30 (20) [10]
20 (10) [10]

21. Starr Ave/Hunt Ave
10 (30) [20]
210 (260) [190] 30 (20) [20] 100 (110) [40]
90 (80) [50]
390 (300) [220]

22. Starr Ave/Pope Street
120 (40) [30]
0 (0) [10]
50 (30) [10]
20 (40) [30]
180 (300) [140]
120 (40) [30] 20 (20) [20] 10 (0) [10] 10 (10) [10]
10 (10) [20]
320 (300) [230]
90 (20) [20]

23. Paseo Grand Dr/College Ave/Pope Street
Grayson Avenue
Main St
Hunt Ave
Starr Ave
Pope Street
Starr Ave
Pope Street
Paseo Grand Dr College Ave
Hunt Ave
Main St
Sulphur Springs Ave
Main St
Spring St
Valley View St
30 (30) [20]
560 (620) [520]
20 (30) [10]
20 (30) [30] 30 (30) [20] 630 (780) [540]

24. Silverado Trail/Pratt Ave
580 (640) [520]
40 (20) [40]
640 (800) [560]10 (10) [10]
10 (10) [20]
30 (50) [30]

25. Silverado Trail/Howell Mountain Rd
220 (130) [100]480 (530) [480]
140 (130) [80]
100 (200) [60] 220 (230) [160] 450 (620) [430]

26. Silverado Trail/Pope Street
Pratt Ave
Silverado Trail
Howell Mountain Rd
Silverado Trail
Pope Street
Silverado Trail
0 (10) [0]
990 (880) [780]
10 (0) [10]
0 (0) [0]
0 (0) [0]
0 (0) [10] 10 (20) [10] 960 (970) [820] 10 (10) [10]
10 (20) [10]
0 (10) [0]
0 (10) [0]

27. Main St/Mills Ln
Mills Ln
Main St
20 (20) [20]
850 (760) [640]130 (120) [130]
10 (20) [20]
10 (10) [10]
10 (30) [40] 30 (10) [10] 900 (900) [740] 10 (30) [40]
10 (20) [30]
10 (0) [10]
70 (70) [60]

28. Main St/Charter Oak Ave
10 (10) [10]70 (90) [90]20 (30) [20]
10 (10) [0]
10 (10) [10]
10 (10) [0] 10 (10) [0] 130 (90) [70] 20 (10) [10]
20 (10) [10]
10 (10) [10]
30 (30) [20]

29. Oak Ave/Pine St
30 (20) [20]80 (90) [90]
80 (130) [80]
10 (10) [10]
70 (40) [30]
70 (40) [10] 30 (10) [10] 120 (110) [60] 30 (30) [10]
30 (20) [20]
50 (40) [30]
40 (60) [60]

30. Oak Ave/Adams St
20 (40) [30]
80 (110) [90]
20 (20) [20]
40 (70) [40]
70 (40) [40]
40 (60) [40] 30 (50) [20] 120 (100) [70] 50 (40) [30]
80 (50) [40]
70 (80) [40]
10 (20) [30]

31. Oak Ave/Spring St
Charter Oak Ave
Main St
Adams St
Oak Ave
Spring St
Oak Ave
Pine St
Oak Ave
140 (100) [80]
720 (650) [540]
40 (30) [30]
90 (70) [60] 40 (40) [40] 590 (620) [550]

32. Main St/Spring St
10 (0) [10]
0 (0) [0]
10 (0) [0]
30 (50) [30]
150 (150) [110]
0 (0) [0] 70 (110) [70] 10 (0) [0] 30 (60) [30]
100 (70) [40]
370 (270) [230]
0 (0) [10]

33. Church St/Pope St
Spring St
Main St
Pope St
Church St

STOP STOP STOP
POTS
STOP
POTS
STOP
STOP
STOP

STOP STOP
STOP
STOP
STOP
STOP
POTS
STOP
STOP

POTS POTS
STOP
STOP
STOP
STOP
POTS
STOP
STOP
STOP
STOP

STOPSTOP
STOP
STOP
STOP
STOP
POTS
STOP
STOP
STOP
POTS
STOP
STOP
STOP
POTS
STOP
STOP
STOP
STOP
POTS
G
E
B
G
E
B
E
B
G
B
G
E
AE
D
AE
D
B
G
E
AE
D
AE
D
G
E
B
AE
D
AE
D
D
D
D
D
D
D
D
D
E
AC
G
D
D
D
D
B
G
CF
AE
AE
BF
AC
G
E
AC
AF
E
G
E
B
B
G
E
BF
AE
D
AE
B
G
E
E
AC
G
AC
G
CF
D
D
AE
D
AE
D
AE
D
D
D
D
D
D
D
D
D
D
D
D
D
B
G
E
D
D
D
D
F
Spring St Spring St
RdRd
Meadowood Ln Meadowood Ln
Mund RdMund Rd
Pratt AvePratt Ave
Inglewood Ave Inglewood Ave
Pope St Pope St
Grayson AveGrayson Ave
Chaix Ln Chaix Ln
White Ln White Ln
Dowdell Ln Dowdell L
M
n
ills Ln Mills Ln
Stice Ln Stice Ln
Fulton Ln Fulton Ln
Lewelling Ln Lewelling Ln
Crane Ave Crane Ave
Vallejo St Vallejo St
Mitchell DrMitchell Dr
Hunt Ave Hunt Ave
Conn Valley RdConn Valley Rd
Taplin RdTaplin Rd
St. Helena
Thoman
Zinfandel
Zinfandel Ln
29 128
Silverado Trl N
Elmhurst
Ave
Hillview Pl
Madrona Ave
Sulphur Springs Ave
Adams St
Charter Oak Ave
Spring St
Railroad Ave
Library Ln
Starr Ave
College Ave
Oak Ave
Hudson Ave
Valley View St
Deer Park Rd
Silverado Trl S
S Howell Mountain RdS Howell Mountain Rd
35 34
32 33
31 30
29 28
27 26
25 24
23 22
21 20
19 18 17
16 15
14 13 12
11 10
9 8
7 6
5 4 36
0 1 2
Miles
Study Intersection
Oak Avenue Extension Scenario
Study Intersection (Grayson Ave Terminus)
Weekday AM (Weekday PM) [Weekend MD]
Peak Hour Traffic Volumes
XX (YY) [ZZ]
Oak Avenue Extension Scenario
Study Intersection (Charter Oak Ave Terminus)
#
Signalized
Intersection
STOP Stop Sign
Adams Street Extension Scenario
Study Intersection
Pope Street Improvement Scenario
Study Intersection
34 25
35/36
36

Page 212 of 1051 ends

Adams Street Extension Traffic Rerouting Assumptions
FIGURE 4
Hillview
Pl
Spring
St
Spring M o untain Rd
Pratt Ave
Pope
St
Grayson Ave
Sulp h ur Springs Ave
Crane AveCrane Ave
Vallejo
St
Mitchell Dr
Zinfandel Ln
Spring
St
Madrona Ave
Fulton Ln
Silverado Trail N
Main St
Main St
Adams St Extension
Oak Ave
Main St
Silverado Trail N
Hillview
Pl
Spring
St
Spring M o untain Rd
Pratt Ave
Pope
St
Grayson Ave
Sulp h ur Springs Ave
Crane Ave
Vallejo
St
Mitchell Dr
Silverado Trail N
Silverado Trail N
Zinfandel Ln
Spring
St
Madrona Ave
Fulton Ln
St. Helena
Zinfandel
County of
Adams St
Adams St Extension
Trac Reduction Trac Increase Negligible Trac Impact
Trac Reduction Trac Increase Adams St Extension
Adams St
Silverado Trail N
St. Helena
Zinfandel

Page 213 of 1051 ends

Oak Ave Extension (Grayson Avenue Terminus) Traffic Rerouting Assumptions FIGURE 5A
Hillview
Pl
Spring
St
Spring M o untain Rd
Pratt Ave
Pope
St
Grayson Ave
Sulp h ur Springs Ave
Vallejo
St
Mitchell Dr
Zinfandel Ln
Spring
St
Fulton Ln
Silverado Trail N
Main St
Main St
Oak Ave
Madrona Ave
Crane AveCrane Ave
Trac Reduction Trac Increase Oak Ave Extension
Silverado Trail N
Zinfandel
Oak Ave Extension
St. Helena
Adams St

Page 214 of 1051 ends

Oak Ave Extension (Charter Oak Terminus) Traffic Rerouting Assumptions FIGURE 5B
Hillview
Pl
Spring
St
Spring M o untain Rd
Pratt Ave
Pope
St
Grayson Ave
Sulp h ur Springs Ave
Crane Ave
Vallejo
St
Mitchell Dr
Zinfandel Ln
Spring
St
Fulton Ln
Silverado Trail N
Main St
Main St
Oak Ave
Madrona Ave
Hillview
Pl
Spring
St
Spring M o untain Rd
Pratt Ave
Pope
St
Grayson Ave
Sulp h ur Springs Ave
Vallejo
St
Mitchell Dr
Zinfandel Ln
Spring
St
Fulton Ln
Silverado Trail N
Main St
Main St
Oak Ave
Madrona Ave
Crane AveCrane Ave
Trac Reduction Trac Increase Oak Ave Extension
Silverado Trail N
Zinfandel
Adams St
Oak Ave Extension St. Helena

Page 215 of 1051 ends

Pope Street Bridge Widening Traffic Rerouting Assumptions FIGURE 6
Hillview
Pl
Spring
St
Spring M o untain Rd
Pratt Ave
Pope
St
Grayson Ave
Sulp h ur Springs Ave
Vallejo
St
Mitchell Dr
Zinfandel Ln
Spring
St
Fulton Ln
Silverado Trail N
Main St
Main St
Pope St Bridge Widening Oak Ave
Madrona Ave
Crane AveCrane Ave
Trac Reduction Trac Increase Pope St Bridge Widening
Silverado Trail N
St. Helena
Zinfandel
Adams St

Page 216 of 1051 ends

Cumulative Plus Project Conditions Peak Hour Intersection Traffic Volumes, Lane Configurations and Traffic Control — Adams Street Scenario FIGURE 7
10 (10) [10]50 (60) [10]
30 (30) [30]
10 (10) [10]
40 (20) [20]
100 (70) [20]

4. Hudson Ave/Madrona Ave
40 (40) [30]
230 (220) [90]
40 (60) [40]
50 (40) [40]
30 (50) [40]
250 (160) [40]

5. Valley View St/Spring St
110 (180) [90]
60 (30) [30]
130 (160) [70]210 (70) [20]
180 (90) [30]
30 (10) [20]

6. Valley View St/Crane Ave/Grayson Ave
10 (30) [10]
10 (40) [10] 10 (20) [10] 130 (140) [70]
140 (160) [50]
20 (30) [10]

7. Crane Ave/Sulphur Spring Ave
10 (10) [20]
720 (940) [640]
40 (40) [30]
10 (10) [10]
0 (10) [10]
10 (10) [10] 10 (10) [10] 900 (690) [620] 30 (30) [20]
30 (60) [20]
0 (10) [0]
30 (50) [30]

8. Main St/Pratt Ave
50 (30) [30]
740 (920) [650]
30 (70) [40]
30 (40) [30] 130 (40) [30] 810 (710) [630]

9. Main St/Elmhurst Ave
40 (30) [20]
610 (650) [520]
20 (20) [10]
100 (120) [80]
50 (50) [20]
50 (20) [40] 110 (60) [50] 610 (610) [560] 120 (80) [50] 80 (180) [80]
60 (50) [20]
20 (20) [10]

10. Main St/Madrona Ave/Fulton Ln
120 (210) [100]
20 (10) [10]
30 (30) [10]
150 (110) [60]
20 (30) [10]
10 (10) [10]

11. Railroad Ave/Fulton Ln
Madrona Ave
Hudson Ave
Grayson Ave
Valley View St Crane Ave
Sulphur Spring Ave
Crane Ave
Pratt Ave
Main St
Elmhurst Ave
Main St
Madrona Ave Fulton Ln Main St
Fulton Ln
Railroad Ave
50 (40) [20]
420 (440) [350]
50 (40) [30]
60 (80) [40]
90 (100) [40]
40 (30) [30] 70 (40) [40] 440 (440) [420] 170 (170) [150] 190 (180) [160]
70 (80) [40]
30 (70) [40]

12. Main St/Adams St
Adams St
Main St
80 (60) [40]
110 (90) [50]
60 (30) [10]
30 (20) [10]
200 (220) [150]
80 (90) [60] 20 (30) [10] 70 (80) [40] 60 (60) [40]
40 (100) [50]
200 (260) [160]
20 (60) [10]

13. Railroad Ave/Adams St
Adams St
Railroad Ave
10 (40) [10]
0 (0) [0]
0 (10) [0]
40 (70) [20]
190 (140) [120]
30 (10) [10] 10 (50) [20] 0 (10) [0] 0 (10) [0]
10 (0) [0]
180 (200) [130]
0 (0) [0]

14. Library Ln/Adams St
500 (490) [380]
110 (80) [70]
490 (510) [460]20 (30) [30]
20 (30) [20]
40 (60) [20]

15. Main St/Hunt Ave
10 (10) [10]10 (10) [20]10 (10) [40]
50 (30) [40]
60 (80) [40]
20 (10) [20] 10 (20) [20] 10 (10) [40] 140 (190) [50]
190 (140) [60]
40 (50) [20]
10 (10) [30]

16. Railroad Ave/Church St/Hunt Ave
30 (20) [20]
30 (30) [0] 20 (20) [10] 120 (150) [90]
60 (70) [70]
40 (50) [30]

17. Oak Ave/Mitchell Dr
80 (100) [90]
610 (560) [460]
80 (70) [50]
170 (210) [140] 10 (10) [10] 490 (510) [450] 80 (80) [40] 100 (80) [40]
40 (30) [30]
200 (160) [110]

18. Main St/Mitchell Dr/Pope St
Adams St
Library Ln
Hunt Ave
Railroad Ave Church St
Mitchell Dr
Oak Ave
rD llehctiM tS epoP Main St
50 (70) [40]
820 (750) [680]
80 (70) [20]
70 (70) [30] 120 (60) [20] 760 (860) [720]

19. Main St/Grayson Avenue
100 (140) [40]
850 (790) [710]
20 (30) [10]
120 (140) [50] 40 (50) [20] 790 (880) [730]

20. Main St/Sulphur Springs Ave
110 (90) [40]
10 (10) [10]
20 (20) [10]
80 (100) [60]
30 (20) [10]
20 (10) [10]

21. Starr Ave/Hunt Ave
10 (30) [20]
190 (230) [170] 30 (20) [20] 100 (110) [40]
90 (80) [50]
340 (260) [190]

22. Starr Ave/Pope Street
120 (40) [30]
0 (0) [10]
50 (30) [10]
20 (40) [30]
160 (270) [120]
120 (40) [30] 20 (20) [20] 10 (0) [10] 10 (10) [10]
10 (10) [20]
270 (260) [200]
90 (20) [20]

23. Paseo Grand Dr/College Ave/Pope Street
Grayson Avenue
Main St
Hunt Ave
Starr Ave
Pope Street
Starr Ave
Pope Street
Paseo Grand Dr College Ave
Hunt Ave
Main St
Sulphur Springs Ave
Main St
Spring St
Valley View St
30 (30) [20]
560 (620) [520]
20 (30) [10]
20 (30) [30] 30 (30) [20] 630 (780) [540]

24. Silverado Trail/Pratt Ave
725 (738) [634]
38 (17) [38]
738 (887) [668]12 (13) [12]
15 (22) [26]
25 (38) [24]

25. Silverado Trail/Howell Mountain Rd
175 (102) [76]
625 (628) [594]
138 (127) [78]
82 (173) [42] 215 (218) [154] 548 (707) [538]

26. Silverado Trail/Pope Street
Pratt Ave
Silverado Trail
Howell Mountain Rd
Silverado Trail
Pope Street
Silverado Trail
0 (10) [0]
890 (810) [690]
10 (0) [10]
0 (0) [0]
0 (0) [0]
0 (0) [10] 10 (20) [10] 880 (910) [730] 10 (10) [10]
10 (20) [10]
0 (10) [0]
0 (10) [0]

27. Main St/Mills Ln
Mills Ln
Main St
20 (20) [20]
750 (690) [550]130 (120) [130]
10 (20) [20]
10 (10) [10]
10 (30) [40] 30 (10) [10] 820 (840) [650] 10 (30) [40]
10 (20) [30]
10 (0) [10]
70 (70) [60]

28. Main St/Charter Oak Ave
10 (10) [10]70 (90) [90]20 (30) [20]
10 (10) [0]
10 (10) [10]
10 (10) [0] 10 (10) [0] 130 (90) [70] 20 (10) [10]
20 (10) [10]
10 (10) [10]
30 (30) [20]

29. Oak Ave/Pine St
30 (20) [20]80 (90) [90]
80 (130) [80]
10 (10) [10]
70 (40) [30]
70 (40) [10] 30 (10) [10] 120 (110) [60] 30 (30) [10]
30 (20) [20]
50 (40) [30]
40 (60) [60]

30. Oak Ave/Adams St
20 (40) [30]
80 (110) [90]
20 (20) [20]
40 (70) [40]
70 (40) [40]
40 (60) [40] 30 (50) [20] 120 (100) [70] 50 (40) [30]
80 (50) [40]
70 (80) [40]
10 (20) [30]

31. Oak Ave/Spring St
Charter Oak Ave
Main St
Adams St
Oak Ave
Spring St
Oak Ave
Pine St
Oak Ave
140 (100) [80]
570 (540) [420]
40 (30) [30]
90 (70) [60] 40 (40) [40] 490 (530) [440]

32. Main St/Spring St
10 (0) [10]
0 (0) [0]
10 (0) [0]
30 (50) [30]
130 (120) [90]
0 (0) [0] 70 (110) [70] 10 (0) [0] 30 (60) [30]
100 (70) [40]
320 (230) [200]
0 (0) [10]

33. Church St/Pope St
150 (110) [120]570 (630) [520]
20 (20) [20]
10 (10) [10]
10 (10) [10]
100 (90) [110] 10 (10) [10] 630 (790) [550] 10 (10) [10] 10 (10) [10]
10 (10) [10]
20 (20) [20]

34. Silverado Trail/Adams St
Spring St
Main St
Adams St
Silverado Trail
Pope St
Church St

STOP STOP STOP
STOP
STOP
STOP
STOP
STOP
STOP

STOP STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP

STOP STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP

STOPSTOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
G
E
B
G
E
B
E
B
G
B
G
E
AE
D
AE
D
B
G
E
AE
D
AE
D
G
E
B
AE
D
AE
D
D
D
D
D
D
D
D
D
E
AC
G
D
D
D
D
B
G
CF
AE
AE
BF
AC
G
E
AC
AF
E
G
E
B
B
G
E
BF
AE
D
AE
B
G
E
E
AC
G
AC
G
CF
D
D
AE
D
AE
D
AE
D
D
D
D
D
D
D
D
D
D
D
D
D
B
G
E
D
D
D
D
AE
BF
AE
D
F
Spring St Spring St
RdRd
Meadowood Ln Meadowood Ln
Mund Rd
Pratt AvePratt Ave
Inglewood Ave Inglewood Ave
Pope St Pope St
Grayson AveGrayson Ave
Chaix Ln Chaix Ln
White Ln White Ln
Dowdell LnDowdell
M
Ln
ills Ln Mills Ln
Stice Ln Stice Ln
Fulton Ln Fulton Ln
Lewelling Ln Lewelling Ln
Crane Ave Crane Ave
Vallejo St Vallejo St
Mitchell DrMitchell Dr
Hunt Ave Hunt Ave
Conn Valley RdConn Valley Rd
Taplin RdTaplin Rd
St. Helena
Thoman
Zinfandel
Zinfandel Ln
29 128
Silverado Trl N
Elmhurst
Ave
Hillview Pl
Madrona Ave
Sulphur Springs Ave
Adams St
Charter Oak Ave
Spring St
Railroad Ave
Library Ln
Starr Ave
College Ave
Oak Ave
Hudson Ave
Valley View St
Deer Park Rd
Silverado Trl S
S Howell Mountain RdS Howell Mountain Rd
35 34
32 33
31 30
29 28
27 26
25 24
23 22
21 20
19 18 17
16 15
14 13 12
11 10
9 8
7 6
5 4 36
0 1 2
M iles
Study Intersection
Oak Avenue Extension Scenario
Study Intersection (Grayson Ave Terminus)
Weekday AM (Weekday PM) [Weekend MD]
Peak Hour Traffic Volumes
XX (YY) [ZZ]
Oak Avenue Extension Scenario
Study Intersection (Charter Oak Ave Terminus)
#
Signalized
Intersection
STOP Stop Sign
Adams Street Extension Scenario
Study Intersection
Pope Street Improvement Scenario
Study Intersection
34 25
35/36
36

Page 217 of 1051 ends

Cumulative Plus Project Conditions Peak Hour Intersection Traffic Volumes, Lane Configurations and Traffic Control — Oak Avenue Extension (Grayson Avenue Terminus)
FIGURE 8A
10 (10) [10]
41 (39) [7]
30 (30) [30]
10 (10) [10]
40 (20) [20]
85 (49) [14]

4. Hudson Ave/Madrona Ave
40 (40) [30]
221 (199) [87]
40 (60) [40]
50 (40) [40]
30 (50) [40]
235 (139) [34]

5. Valley View St/Spring St
101 (159) [87]
60 (30) [30]
115 (139) [64]210 (70) [20]
180 (90) [30]
30 (10) [20]

6. Valley View St/Crane Ave/Grayson Ave
10 (30) [10]
10 (40) [10] 10 (20) [10] 115 (119) [64]
131 (139) [47]
20 (30) [10]

7. Crane Ave/Sulphur Spring Ave
10 (10) [20]
720 (940) [640]
40 (40) [30]
10 (10) [10]
0 (10) [10]
10 (10) [10] 10 (10) [10] 900 (690) [620] 30 (30) [20]
30 (60) [20]
0 (10) [0]
30 (50) [30]

8. Main St/Pratt Ave
50 (30) [30]
740 (920) [650]
30 (70) [40]
30 (40) [30] 130 (40) [30] 810 (710) [630]

9. Main St/Elmhurst Ave
19 (21) [13]
550 (590) [460]
20 (20) [10]
160 (180) [140]
50 (50) [20]
15 (11) [26] 180 (120) [110] 540 (550) [500] 120 (80) [50] 80 (180) [80]
60 (50) [20]
20 (20) [10]

10. Main St/Madrona Ave/Fulton Ln
120 (210) [100]
20 (10) [10]
30 (30) [10]
150 (110) [60]
20 (30) [10]
10 (10) [10]

11. Railroad Ave/Fulton Ln
Madrona Ave
Hudson Ave
Grayson Ave
Valley View St Crane Ave
Sulphur Spring Ave
Crane Ave
Pratt Ave
Main St
Elmhurst Ave
Main St
Madrona Ave Fulton Ln Main St
Fulton Ln
Railroad Ave
50 (40) [20]
489 (481) [403]
50 (40) [30]
60 (80) [40]
90 (100) [40]
40 (30) [30] 70 (40) [40] 435 (461) [456] 70 (80) [40]
40 (70) [40]
70 (80) [40]
30 (70) [40]

12. Main St/Adams St
Adams St
Main St
80 (60) [40]
110 (90) [50]
60 (30) [10]
30 (20) [10]
100 (130) [40]
80 (90) [60] 20 (30) [10] 70 (80) [40] 60 (60) [40]
40 (100) [50]
50 (150) [40]
20 (60) [10]

13. Railroad Ave/Adams St
Adams St
Railroad Ave
10 (40) [10]
0 (0) [0]
0 (10) [0]
40 (70) [20]
90 (50) [10]
30 (10) [10] 10 (50) [20] 0 (10) [0] 0 (10) [0]
10 (0) [0]
30 (90) [10]
0 (0) [0]

14. Library Ln/Adams St
569 (531) [433]
110 (80) [70]
485 (531) [496]20 (30) [30]
20 (30) [20]
40 (60) [20]

15. Main St/Hunt Ave
10 (10) [10]10 (10) [20]10 (10) [40]
50 (30) [40]
60 (80) [40]
20 (10) [20] 10 (20) [20] 10 (10) [40] 140 (190) [50]
190 (140) [60]
40 (50) [20]
10 (10) [30]

16. Railroad Ave/Church St/Hunt Ave
10 (10) [10]
150 (130) [80]
10 (10) [10]
30 (20) [20]
30 (30) [10]
10 (10) [10] 20 (20) [10] 92 (66) [71] 120 (150) [90]
60 (70) [70]
40 (50) [30]
12 (6) [1]

17. Oak Ave/Mitchell Dr
80 (100) [90]
569 (521) [473]
80 (70) [50]
170 (210) [140] 10 (10) [10] 437 (477) [457] 100 (110) [60] 150 (120) [70]
52 (36) [31]
188 (154) [109]

18. Main St/Mitchell Dr/Pope St
Adams St
Library Ln
Hunt Ave
Railroad Ave Church St
Mitchell Dr
Oak Ave
rD llehctiM tS epoP Main St
140 (160) [110]839 (751) [703]
20 (30) [10]
190 (160) [110] 80 (30) [10] 735 (851) [736]

19. Main St/Grayson Avenue
91 (119) [37]
959 (881) [803]
20 (30) [10]
105 (119) [44] 40 (50) [20] 885 (961) [826]

20. Main St/Sulphur Springs Ave
110 (90) [40]
10 (10) [10]
20 (20) [10]
80 (100) [60]
30 (20) [10]
20 (10) [10]

21. Starr Ave/Hunt Ave
10 (30) [20]
210 (260) [190] 30 (20) [20] 100 (110) [40]
90 (80) [50]
390 (300) [220]

22. Starr Ave/Pope Street
120 (40) [30]
0 (0) [10]
50 (30) [10]
20 (40) [30]
180 (300) [140]
120 (40) [30] 20 (20) [20] 10 (0) [10] 10 (10) [10]
10 (10) [20]
320 (300) [230]
90 (20) [20]

23. Paseo Grand Dr/College Ave/Pope Street
Grayson Avenue
Main St
Hunt Ave
Starr Ave
Pope Street
Starr Ave
Pope Street
Paseo Grand Dr College Ave
Hunt Ave
Main St
Sulphur Springs Ave
Main St
Spring St
Valley View St
30 (30) [20]
560 (620) [520]
20 (30) [10]
20 (30) [30] 30 (30) [20] 630 (780) [540]

24. Silverado Trail/Pratt Ave
580 (640) [520]
40 (20) [40]
640 (800) [560]10 (10) [10]
10 (10) [20]
30 (50) [30]

25. Silverado Trail/Howell Mountain Rd
220 (130) [100]480 (530) [480]
140 (130) [80]
100 (200) [60] 220 (230) [160] 450 (620) [430]

26. Silverado Trail/Pope Street
Pratt Ave
Silverado Trail
Howell Mountain Rd
Silverado Trail
Pope Street
Silverado Trail
0 (10) [0]
849 (771) [703]
10 (0) [10]
0 (0) [0]
0 (0) [0]
0 (0) [10] 10 (20) [10] 815 (871) [736] 10 (10) [10]
10 (20) [10]
0 (10) [0]
0 (10) [0]

27. Main St/Mills Ln
Mills Ln
Main St
20 (20) [20]
709 (651) [563]130 (120) [130]
10 (20) [20]
10 (10) [10]
10 (30) [40] 30 (10) [10] 755 (801) [656] 10 (30) [40]
10 (20) [30]
10 (0) [10]
70 (70) [60]

28. Main St/Charter Oak Ave
10 (10) [10]
160 (180) [160]
20 (30) [20]
10 (10) [0]
10 (10) [10]
10 (10) [0] 10 (10) [0] 250 (180) [150] 20 (10) [10]
20 (10) [10]
10 (10) [10]
30 (30) [20]

29. Oak Ave/Pine St
30 (20) [20]
170 (180) [160]
80 (130) [80]
10 (10) [10]
70 (40) [30]
70 (40) [10] 30 (10) [10] 240 (200) [140] 30 (30) [10]
30 (20) [20]
50 (40) [30]
40 (60) [60]

30. Oak Ave/Adams St
20 (40) [30]
170 (200) [160]
80 (60) [30]
40 (70) [40]
70 (40) [40]
40 (60) [40] 30 (50) [20] 240 (190) [150] 50 (40) [30]
80 (50) [40]
70 (80) [40]
38 (44) [39]

31. Oak Ave/Spring St
Charter Oak Ave
Main St
Adams St
Oak Ave
Spring St
Oak Ave
Pine St
Oak Ave
140 (100) [80]
579 (541) [463]
100 (70) [40]
90 (70) [60] 68 (64) [49] 457 (527) [467]

32. Main St/Spring St
10 (0) [10]
0 (0) [0]
10 (0) [0]
30 (50) [30]
150 (150) [110]
0 (0) [0] 70 (110) [70] 10 (0) [0] 30 (60) [30]
100 (70) [40]
370 (270) [230]
0 (0) [10]

33. Church St/Pope St
60 (40) [10]
90 (100) [40] 40 (30) [10] 120 (90) [80]
90 (90) [70]
130 (100) [50]

35. Oak Ave/Grayson Ave
10 (10) [10]
150 (130) [80]
10 (10) [10]
10 (10) [10]
30 (60) [70]
10 (10) [10] 10 (10) [10] 160 (120) [90] 10 (10) [10]
10 (10) [10]
60 (30) [40]
10 (10) [10]

36. Oak Ave/Charter Oak Ave
Spring St
Main St
Grayson Ave
Oak Ave
Charter Oak Ave
Oak Ave
Pope St
Church St

STOP STOP STOP
STOP
STOP
STOP
STOP
STOP
STOP

STOP STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP

STOPSTOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP

STOP STOP
STOP
STOP
G
E
B
G
E
B
E
B
G
B
G
E
AE
D
AE
D
B
G
E
AE
D
AE
D
G
E
B
AE
D
AE
D
D
D
D
D
D
D
D
D
E
AC
G
D
D
D
D
D
D
D
D
AE
AE
BF
AC
G
E
AC
AF
E
G
E
B
B
G
E
BF
AE
D
AE
B
G
E
E
AC
G
AC
G
CF
D
D
AE
D
AE
D
AE
D
D
D
D
D
D
D
D
D
D
D
D
D
B
G
E
D
D
D
D
B
G
E
D
D
D
D
F
Spring St Spring St
RdRd
Meadowood Ln Meadowood Ln
Mund Rd
Pratt AvePratt Ave
Inglewood Ave Inglewood Ave
Pope St Pope St
Grayson AveGrayson Ave
Chaix Ln Chaix Ln
White Ln White Ln
Dowdell LnDowdell
M
Ln
ills Ln Mills Ln
Stice Ln Stice Ln
Fulton Ln Fulton Ln
Lewelling Ln Lewelling Ln
Crane Ave Crane Ave
Vallejo St Vallejo St
Mitchell DrMitchell Dr
Hunt Ave Hunt Ave
Conn Valley RdConn Valley Rd
Taplin RdTaplin Rd
St. Helena
Thoman
Zinfandel
Zinfandel Ln
29 128
Silverado Trl N
Elmhurst
Ave
Hillview Pl
Madrona Ave
Sulphur Springs Ave
Adams St
Charter Oak Ave
Spring St
Railroad Ave
Library Ln
Starr Ave
College Ave
Oak Ave
Hudson Ave
Valley View St
Deer Park Rd
Silverado Trl S
S Howell Mountain RdS Howell Mountain Rd
35 34
32 33
31 30
29 28
27 26
25 24
23 22
21 20
19 18 17
16 15
14 13 12
11 10
9 8
7 6
5 4 36
0 1 2
M iles
Study Intersection
Oak Avenue Extension Scenario
Study Intersection (Grayson Ave Terminus)
Weekday AM (Weekday PM) [Weekend MD]
Peak Hour Traffic Volumes
XX (YY) [ZZ]
Oak Avenue Extension Scenario
Study Intersection (Charter Oak Ave Terminus)
#
Signalized
Intersection
STOP Stop Sign
Adams Street Extension Scenario
Study Intersection
Pope Street Improvement Scenario
Study Intersection
34 25
35/36
36

Page 218 of 1051 ends

Cumulative Plus Project Conditions Peak Hour Intersection Traffic Volumes, Lane Configurations and Traffic Control — Oak Avenue Extension (Charter Oak Avenue Terminus)
FIGURE 8B
10 (10) [10]
41 (46) [7]
30 (30) [30]
10 (10) [10]
40 (20) [20]
88 (56) [14]

4. Hudson Ave/Madrona Ave
40 (40) [30]
221 (206) [87]
40 (60) [40]
50 (40) [40]
30 (50) [40]
238 (146) [34]

5. Valley View St/Spring St
101 (166) [87]
60 (30) [30]
118 (146) [64]210 (70) [20]
180 (90) [30]
30 (10) [20]

6. Valley View St/Crane Ave/Grayson Ave
10 (30) [10]
10 (40) [10] 10 (20) [10] 118 (126) [64]
131 (146) [47]
20 (30) [10]

7. Crane Ave/Sulphur Spring Ave
10 (10) [20]
720 (940) [640]
40 (40) [30]
10 (10) [10]
0 (10) [10]
10 (10) [10] 10 (10) [10] 900 (690) [620] 30 (30) [20]
30 (60) [20]
0 (10) [0]
30 (50) [30]

8. Main St/Pratt Ave
50 (30) [30]
740 (920) [650]
30 (70) [40]
30 (40) [30] 130 (40) [30] 810 (710) [630]

9. Main St/Elmhurst Ave
19 (24) [13]
550 (590) [460]
20 (20) [10]
160 (180) [140]
50 (50) [20]
22 (14) [26] 180 (120) [110] 540 (550) [500] 120 (80) [50] 80 (180) [80]
60 (50) [20]
20 (20) [10]

10. Main St/Madrona Ave/Fulton Ln
120 (210) [100]
20 (10) [10]
30 (30) [10]
150 (110) [60]
20 (30) [10]
10 (10) [10]

11. Railroad Ave/Fulton Ln
Madrona Ave
Hudson Ave
Grayson Ave
Valley View St Crane Ave
Sulphur Spring Ave
Crane Ave
Pratt Ave
Main St
Elmhurst Ave
Main St
Madrona Ave Fulton Ln Main St
Fulton Ln
Railroad Ave
50 (40) [20]
489 (484) [403]
50 (40) [30]
60 (80) [40]
90 (100) [40]
40 (30) [30] 70 (40) [40] 442 (464) [456] 70 (80) [40]
40 (70) [40]
70 (80) [40]
30 (70) [40]

12. Main St/Adams St
Adams St
Main St
80 (60) [40]
110 (90) [50]
60 (30) [10]
30 (20) [10]
100 (130) [40]
80 (90) [60] 20 (30) [10] 70 (80) [40] 60 (60) [40]
40 (100) [50]
50 (150) [40]
20 (60) [10]

13. Railroad Ave/Adams St
Adams St
Railroad Ave
10 (40) [10]
0 (0) [0]
0 (10) [0]
40 (70) [20]
90 (50) [10]
30 (10) [10] 10 (50) [20] 0 (10) [0] 0 (10) [0]
10 (0) [0]
30 (90) [10]
0 (0) [0]

14. Library Ln/Adams St
569 (534) [433]
110 (80) [70]
492 (534) [496]20 (30) [30]
20 (30) [20]
40 (60) [20]

15. Main St/Hunt Ave
10 (10) [10]10 (10) [20]10 (10) [40]
50 (30) [40]
60 (80) [40]
20 (10) [20] 10 (20) [20] 10 (10) [40] 140 (190) [50]
190 (140) [60]
40 (50) [20]
10 (10) [30]

16. Railroad Ave/Church St/Hunt Ave
10 (10) [10]90 (80) [70]10 (10) [10]
10 (20) [20]
30 (30) [10]
0 (10) [10] 20 (20) [10] 110 (80) [80] 120 (150) [90]
60 (70) [70]
40 (50) [30]
10 (10) [10]

17. Oak Ave/Mitchell Dr
80 (100) [90]
629 (564) [483]
80 (70) [50]
0 (0) [0]
0 (0) [0]
170 (210) [140] 10 (10) [10] 472 (504) [466] 100 (110) [60] 150 (120) [70]
40 (30) [30]
200 (160) [110]

18. Main St/Mitchell Dr/Pope St
Adams St
Library Ln
Hunt Ave
Railroad Ave Church St
Mitchell Dr
Oak Ave
rD llehctiM tS epoP Main St
50 (70) [40]
929 (834) [773]
80 (70) [20]
70 (70) [30] 120 (60) [20] 852 (934) [816]

19. Main St/Grayson Avenue
91 (126) [37]
959 (874) [803]
20 (30) [10]
108 (126) [44] 40 (50) [20] 882 (954) [826]

20. Main St/Sulphur Springs Ave
110 (90) [40]
10 (10) [10]
20 (20) [10]
80 (100) [60]
30 (20) [10]
20 (10) [10]

21. Starr Ave/Hunt Ave
10 (30) [20]
210 (260) [190] 30 (20) [20] 100 (110) [40]
90 (80) [50]
390 (300) [220]

22. Starr Ave/Pope Street
120 (40) [30]
0 (0) [10]
50 (30) [10]
20 (40) [30]
180 (300) [140]
120 (40) [30] 20 (20) [20] 10 (0) [10] 10 (10) [10]
10 (10) [20]
320 (300) [230]
90 (20) [20]

23. Paseo Grand Dr/College Ave/Pope Street
Grayson Avenue
Main St
Hunt Ave
Starr Ave
Pope Street
Starr Ave
Pope Street
Paseo Grand Dr College Ave
Hunt Ave
Main St
Sulphur Springs Ave
Main St
Spring St
Valley VIEW St
30 (30) [20]
560 (620) [520]
20 (30) [10]
20 (30) [30] 30 (30) [20] 630 (780) [540]

24. Silverado Trail/Pratt Ave
580 (640) [520]
40 (20) [40]
640 (800) [560]10 (10) [10]
10 (10) [20]
30 (50) [30]

25. Silverado Trail/Howell Mountain Rd
220 (130) [100]480 (530) [480]
140 (130) [80]
100 (200) [60] 220 (230) [160] 450 (620) [430]

26. Silverado Trail/Pope Street
Pratt Ave
Silverado Trail
Howell Mountain Rd
Silverado Trail
Pope Street
Silverado Trail
0 (10) [0]
999 (894) [783]
10 (0) [10]
0 (0) [0]
0 (0) [0]
0 (0) [10] 10 (20) [10] 972 (984) [826] 10 (10) [10]
10 (20) [10]
0 (10) [0]
0 (10) [0]

27. Main St/Mills Ln
Mills Ln
Main St
110 (100) [90]
769 (694) [573]130 (120) [130]
10 (20) [20]
10 (10) [10]
120 (110) [120] 30 (10) [10] 802 (834) [666] 10 (30) [40] 10 (20) [30]
10 (0) [10]
70 (70) [60]

28. Main St/Charter Oak Ave
10 (10) [10]
160 (170) [160]
20 (30) [20]
10 (10) [0]
10 (10) [10]
10 (10) [0] 10 (10) [0] 240 (170) [150] 20 (10) [10]
20 (10) [10]
10 (10) [10]
30 (30) [20]

29. Oak Ave/Pine St
30 (20) [20]
170 (170) [160]
80 (130) [80]
10 (10) [10]
70 (40) [30]
70 (40) [10] 30 (10) [10] 230 (190) [140] 30 (30) [10]
30 (20) [20]
50 (40) [30]
40 (60) [60]

30. Oak Ave/Adams St
20 (40) [30]
170 (190) [160]
20 (20) [20]
40 (70) [40]
70 (40) [40]
40 (60) [40] 30 (50) [20] 230 (180) [150] 50 (40) [30]
80 (50) [40]
70 (80) [40]
10 (20) [30]

31. Oak Ave/Spring St
Charter Oak Ave
Main St
Adams St
Oak Ave
Spring St
Oak Ave
Pine St
Oak Ave
140 (100) [80]
639 (584) [473]
40 (30) [30]
90 (70) [60] 40 (40) [40] 492 (554) [476]

32. Main St/Spring St
10 (0) [10]
0 (0) [0]
10 (0) [0]
30 (50) [30]
150 (150) [110]
0 (0) [0] 70 (110) [70] 10 (0) [0] 30 (60) [30]
100 (70) [40]
370 (270) [230]
0 (0) [10]

33. Church St/Pope St
10 (10) [10]
30 (60) [70] 110 (80) [80]
90 (80) [70]
60 (30) [40]

36. Oak Ave/Charter Oak Ave
Spring St
Main St
Charter Oak Ave
Oak Ave
Pope St
Church St

STOP STOP STOP
STOP
STOP
STOP
STOP
STOP
STOP

STOP STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP

STOPSTOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP

STOP STOP
G
E
B
G
E
B
E
B
G
B
G
E
AE
D
AE
D
B
G
E
AE
D
AE
D
G
E
B
AE
D
AE
D
D
D
D
D
D
D
D
D
E
AC
G
D
D
D
D
D
D
D
D
AE
BF
AE
BF
AC
G
E
AC
AF
E
G
E
B
B
G
E
BF
AE
D
AE
B
G
E
E
AC
G
AC
G
CF
D
D
AE
D
AE
D
AE
D
D
D
D
D
D
D
D
D
D
D
D
D
B
G
E
D
D
D
D
B
A
E
Spring St Spring St
RdRd
Meadowood Ln Meadowood Ln
Mund Rd
Pratt AvePratt Ave
Inglewood Ave Inglewood Ave
Pope St Pope St
Grayson AveGrayson Ave
Chaix Ln Chaix Ln
White Ln White Ln
Dowdell LnDowdell
M
Ln
ills Ln Mills Ln
Stice Ln Stice Ln
Fulton Ln Fulton Ln
Lewelling Ln Lewelling Ln
Crane Ave Crane Ave
Vallejo St Vallejo St
Mitchell DrMitchell Dr
Hunt Ave Hunt Ave
Conn Valley RdConn Valley Rd
Taplin RdTaplin Rd
St. Helena
Thoman
Zinfandel
Zinfandel Ln
29 128
Silverado Trl N
Elmhurst
Ave
Hillview Pl
Madrona Ave
Sulphur Springs Ave
Adams St
Charter Oak Ave
Spring St
Railroad Ave
Library Ln
Starr Ave
College Ave
Oak Ave
Hudson Ave
Valley View St
Deer Park Rd
Silverado Trl S
S Howell Mountain RdS Howell Mountain Rd
35 34
32 33
31 30
29 28
27 26
25 24
23 22
21 20
19 18 17
16 15
14 13 12
11 10
9 8
7 6
5 4 36
0 1 2
M iles
Study Intersection
Oak Avenue Extension Scenario
Study Intersection (Grayson Ave Terminus)
Weekday AM (Weekday PM) [Weekend MD]
Peak Hour Traffic Volumes
XX (YY) [ZZ]
Oak Avenue Extension Scenario
Study Intersection (Charter Oak Ave Terminus)
#
Signalized
Intersection
STOP Stop Sign
Adams Street Extension Scenario
Study Intersection
Pope Street Improvement Scenario
Study Intersection
34 25
35/36
36

Page 219 of 1051 ends

Cumulative Plus Project Conditions Peak Hour Intersection Traffic Volumes, Lane Configurations and Traffic Control — Pope Street Scenario FIGURE 9
10 (10) [10]50 (60) [10]
30 (30) [30]
10 (10) [10]
40 (20) [20]
100 (70) [20]

4. Hudson Ave/Madrona Ave
40 (40) [30]
230 (220) [90]
40 (60) [40]
50 (40) [40]
30 (50) [40]
250 (160) [40]

5. Valley View St/Spring St
110 (180) [90]
60 (30) [30]
130 (160) [70]210 (70) [20]
180 (90) [30]
30 (10) [20]

6. Valley View St/Crane Ave/Grayson Ave
10 (30) [10]
10 (40) [10] 10 (20) [10] 130 (140) [70]
140 (160) [50]
20 (30) [10]

7. Crane Ave/Sulphur Spring Ave
10 (10) [20]
720 (940) [640]
40 (40) [30]
10 (10) [10]
0 (10) [10]
10 (10) [10] 10 (10) [10] 900 (690) [620] 30 (30) [20]
30 (60) [20]
0 (10) [0]
30 (50) [30]

8. Main St/Pratt Ave
50 (30) [30]
740 (920) [650]
30 (70) [40]
30 (40) [30] 130 (40) [30] 810 (710) [630]

9. Main St/Elmhurst Ave
40 (30) [20]
610 (650) [520]
20 (20) [10]
100 (120) [80]
50 (50) [20]
50 (20) [40] 110 (60) [50] 610 (610) [560] 120 (80) [50] 80 (180) [80]
60 (50) [20]
20 (20) [10]

10. Main St/Madrona Ave/Fulton Ln
120 (210) [100]
20 (10) [10]
30 (30) [10]
150 (110) [60]
20 (30) [10]
10 (10) [10]

11. Railroad Ave/Fulton Ln
Madrona Ave
Hudson Ave
Grayson Ave
Valley View St Crane Ave
Sulphur Spring Ave
Crane Ave
Pratt Ave
Main St
Elmhurst Ave
Main St
Madrona Ave Fulton Ln
Main St
Fulton Ln
Railroad Ave
50 (40) [20]
570 (550) [470]
50 (40) [30]
60 (80) [40]
90 (100) [40]
40 (30) [30] 70 (40) [40] 540 (530) [530] 70 (80) [40]
40 (70) [40]
70 (80) [40]
30 (70) [40]

12. Main St/Adams St
Adams St
Main St
80 (60) [40]
110 (90) [50]
60 (30) [10]
30 (20) [10]
100 (130) [40]
80 (90) [60] 20 (30) [10] 70 (80) [40] 60 (60) [40]
40 (100) [50]
50 (150) [40]
20 (60) [10]

13. Railroad Ave/Adams St
Adams St
Railroad Ave
10 (40) [10]
0 (0) [0]
0 (10) [0]
40 (70) [20]
90 (50) [10]
30 (10) [10] 10 (50) [20] 0 (10) [0] 0 (10) [0]
10 (0) [0]
30 (90) [10]
0 (0) [0]

14. Library Ln/Adams St
650 (600) [500]
110 (80) [70]
590 (600) [570]20 (30) [30]
20 (30) [20]
40 (60) [20]

15. Main St/Hunt Ave
10 (10) [10]10 (10) [20]10 (10) [40]
50 (30) [40]
60 (80) [40]
20 (10) [20] 10 (20) [20] 10 (10) [40] 140 (190) [50]
190 (140) [60]
40 (50) [20]
10 (10) [30]

16. Railroad Ave/Church St/Hunt Ave
30 (20) [20]
30 (30) [0] 20 (20) [10] 120 (150) [90]
60 (70) [70]
40 (50) [30]

17. Oak Ave/Mitchell Dr
80 (100) [90]
690 (620) [540]
80 (70) [50]
170 (210) [140] 10 (10) [10] 560 (560) [530] 110 (120) [70] 170 (130) [80]
40 (30) [30]
200 (160) [110]

18. Main St/Mitchell Dr/Pope St
Adams St
Library Ln
Hunt Ave
Railroad Ave Church St
Mitchell Dr
Oak Ave
Mitchell Dr Pope St
Main St
50 (70) [40]
900 (810) [760]
80 (70) [20]
70 (70) [30] 120 (60) [20] 830 (910) [800]

19. Main St/Grayson Avenue
100 (140) [40]
930 (850) [790]
20 (30) [10]
120 (140) [50] 40 (50) [20] 860 (930) [810]

20. Main St/Sulphur Springs Ave
110 (90) [40]
10 (10) [10]
20 (20) [10]
80 (100) [60]
30 (20) [10]
20 (10) [10]

21. Starr Ave/Hunt Ave
10 (30) [20]
220 (270) [200] 30 (20) [20] 100 (110) [40]
90 (80) [50]
410 (310) [230]

22. Starr Ave/Pope Street
120 (40) [30]
0 (0) [10]
50 (30) [10]
20 (40) [30]
190 (310) [150]
120 (40) [30] 20 (20) [20] 10 (0) [10] 10 (10) [10]
10 (10) [20]
340 (310) [240]
90 (20) [20]

23. Paseo Grand Dr/College Ave/Pope Street
Grayson Avenue
Main St
Hunt Ave
Starr Ave
Pope Street
Starr Ave
Pope Street
Paseo Grand Dr College Ave
Hunt Ave
Main St
Sulphur Springs Ave
Main St
Spring St
Valley View St
30 (30) [20]
560 (620) [520]
20 (30) [10]
20 (30) [30] 30 (30) [20] 630 (780) [540]

24. Silverado Trail/Pratt Ave
240 (140) [110]440 (510) [440]
40 (20) [40]
140 (130) [80]
10 (10) [10]
110 (210) [70] 220 (230) [160] 420 (570) [400] 10 (10) [10] 10 (10) [20]
10 (10) [10]
30 (50) [30]

25. Silverado Trail/Pope Street/Howell Mountain Rd
0 (10) [0]
970 (870) [770]
10 (0) [10]
0 (0) [0]
0 (0) [0]
0 (0) [10] 10 (20) [10] 950 (960) [810] 10 (10) [10]
10 (20) [10]
0 (10) [0]
0 (10) [0]

27. Main St/Mills Ln
Pratt Ave
Silverado Trail
Pope Street Howell Mountain Rd Silverado Trail
Mills Ln
Main St
20 (20) [20]
830 (750) [630]130 (120) [130]
10 (20) [20]
10 (10) [10]
10 (30) [40] 30 (10) [10] 890 (890) [730] 10 (30) [40]
10 (20) [30]
10 (0) [10]
70 (70) [60]

28. Main St/Charter Oak Ave
Charter Oak Ave
Main St
10 (10) [10]70 (90) [90]20 (30) [20]
10 (10) [0]
10 (10) [10]
10 (10) [0] 10 (10) [0] 130 (90) [70] 20 (10) [10]
20 (10) [10]
10 (10) [10]
30 (30) [20]

29. Oak Ave/Pine St
30 (20) [20]80 (90) [90]
80 (130) [80]
10 (10) [10]
70 (40) [30]
70 (40) [10] 30 (10) [10] 120 (110) [60] 30 (30) [10]
30 (20) [20]
50 (40) [30]
40 (60) [60]

30. Oak Ave/Adams St
20 (40) [30]
80 (110) [90]
20 (20) [20]
40 (70) [40]
70 (40) [40]
40 (60) [40] 30 (50) [20] 120 (100) [70] 50 (40) [30]
80 (50) [40]
70 (80) [40]
10 (20) [30]

31. Oak Ave/Spring St
140 (100) [80]
720 (650) [540]
40 (30) [30]
90 (70) [60] 40 (40) [40] 590 (620) [550]

32. Main St/Spring St
Pine St
Oak Ave
Spring St
Oak Ave
Spring St
Main St
Adams St
Oak Ave
10 (0) [10]
0 (0) [0]
10 (0) [0]
30 (50) [30]
160 (160) [120]
0 (0) [0] 70 (110) [70] 10 (0) [0] 30 (60) [30]
100 (70) [40]
390 (280) [240]
0 (0) [10]

33. Church St/Pope St
Pope St
Church St

STOP STOP STOP
POTS
STOP
POTS
STOP
STOP
STOP

STOP STOP
STOP
STOP
STOP
STOP
POTS
STOP
STOP

POTS POTS
STOP
STOP
STOP
STOP
POTS
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
POTS
STOP
STOP
STOP
POTS
STOP
STOP
STOP
POTS
STOP
STOP
STOP
STOP
POTS
G
E
B
G
E
B
E
B
G
B
G
E
AE
D
AE
D
B
G
E
AE
D
AE
D
G
E
B
AE
D
AE
D
D
D
D
D
D
D
D
D
E
AC
G
D
D
D
D
B
G
CF
AE
AE
BF
AC
G
E
AC
AF
E
G
E
B
B
G
E
BF
AE
D
AE
B
G
E
AE
BF
AE
D
D
D
AE
D
AE
D
AE
D
D
D
D
D
D
D
D
D
D
D
D
D
B
G
E
D
D
D
D
F
Spring St Spring St
RdRd
Meadowood Ln Meadowood Ln
Mund RdMund Rd
Pratt AvePratt Ave
Inglewood Ave Inglewood Ave
Pope St Pope St
Grayson AveGrayson Ave
Chaix Ln Chaix Ln
White Ln White Ln
Dowdell Ln Dowdell L
M
n
ills Ln Mills Ln
Stice Ln Stice Ln
Fulton Ln Fulton Ln
Lewelling Ln Lewelling Ln
Crane Ave Crane Ave
Vallejo St Vallejo St
Mitchell DrMitchell Dr
Hunt Ave Hunt Ave
Conn Valley RdConn Valley Rd
Taplin RdTaplin Rd
St. Helena
Thoman
Zinfandel
Zinfandel Ln
29 128
Silverado Trl N
Elmhurst
Ave
Hillview Pl
Madrona Ave
Sulphur Springs Ave
Adams St
Charter Oak Ave
Spring St
Railroad Ave
Library Ln
Starr Ave
College Ave
Oak Ave
Hudson Ave
Valley View St
Deer Park Rd
Silverado Trl S
S Howell Mountain RdS Howell Mountain Rd
35 34
32 33
31 30
29 28
27 26
25 24
23 22
21 20
19 18 17
16 15
14 13 12
11 10
9 8
7 6
5 4 36
0 1 2
Miles
Study Intersection
Oak Avenue Extension Scenario
Study Intersection (Grayson Ave Terminus)
Weekday AM (Weekday PM) [Weekend MD]
Peak Hour Traffic Volumes
XX (YY) [ZZ]
Oak Avenue Extension Scenario
Study Intersection (Charter Oak Ave Terminus)
#
Signalized
Intersection
STOP Stop Sign
Adams Street Extension Scenario
Study Intersection
Pope Street Improvement Scenario
Study Intersection
34 25
35/36
36

Page 220 of 1051 ends

Saint Helena Streets Master Plan Roadway Project Alternatives Analysis | 23 Adams Street Extension Alternative
The extension of Adams Street from its current eastern terminus at 899 Adams Street to Silverado Trail via a new bridge over the Napa River will provide a new east-west connection between Silverado Trail and Main Street. Because a portion of this new connection extends outside the City boundary, the extension of Adams Street will provide a new connection benefiting both the City and the County.

As such, the extension will result in a rerouting of traffic volumes from Main Street to Silverado Trail and Adams Street because it will provide a new, desirable route to bypass congestion on Main Street.

Additionally, it is also expected to reroute traffic volumes from Pope Street to Silverado Trail and Adams Street.

Intersection operations analysis results with Adams Street extension illustrate that the extension will provide congestion reductions along Main Street. Notably, at Main Street/Pope Street-Mitchell Drive, the LOS is improved from LOS F to LOS E for the weekday AM, weekday PM, and weekend MD peak hours; this indicates that (at the whole-intersection level), the intersection will operate at-capacity instead of over-capacity with the construction of the Adams Street extension. In addition, the following intersections are projected to improve from unacceptable operations without the Adams Street extension to acceptable operations with the extension for at least one peak hour:
• Main Street/Adams Street
• Main Street/Hunt Avenue
• Main Street/Grayson Avenue
The extension of Adams Street will introduce a new intersection at Silverado Trail/Adams Street. The new intersection is expected to operate at LOS B with traffic signal installation, and would operate similarly well if a roundabout is implemented in lieu of a traffic signal.

The rerouting of traffic volumes would increase traffic volume at additional locations, including segments along Silverado Trail between Pope Street and Adams Street, and Adams Street between Silverado Trail and Main Street. As such, traffic volume is expected to increase at intersection locations such as Main Street/Adams Street and Silverado Trail/Pope Street. However, the analysis indicates that these intersections are still expected to operate at a LOS similar to or better than the No Project scenario, with the exception of Silverado Trail/Howell Mountain Road which worst approach delay would degrade from a high LOS C to a low LOS D for the weekday PM peak hour.

In addition to improving vehicular circulation, the extension is envisioned to include a shared-use path for pedestrians and bicyclists to support bicycle and pedestrian connectivity throughout the City.

Oak Avenue Extension Alternative
The extension of Oak Avenue – either between Mitchell Drive and Grayson Avenue or between Mitchell Drive and Charter Oak Avenue - will provide a new north-south connection within the City along with a new crossing of Sulphur Creek. The extension provides a new, desirable route to bypass the most congested stretch of Main Street and balance the existing high demand for Main Street. It will shift traffic volume traveling north and south along Main Street and the Valley View Street-Crane Avenue corridor to the new Oak Avenue extension.

Intersection operations analysis results with Oak Avenue extension alternative illustrate that the extension, with either southern terminus options, will generally provide improved operations along

Page 221 of 1051 ends

Saint Helena Streets Master Plan Roadway Project Alternatives Analysis | 24 Main Street. For example, at Main Street/Pope Street-Mitchell Drive, the LOS is improved from a high LOS F to a LOS E or low F for the weekday AM, weekday PM, and weekend MD peak hours.

This indicates that (at the whole-intersection level), the intersection will operate at-capacity instead of over-capacity with the construction of the Oak Avenue extension.

In addition, the following intersections are projected to improve from unacceptable operations without the Oak Avenue extension to acceptable operations with the extension for at least one peak hour:
• Main Street/Adams Street
• Main Street/Hunt Avenue
• Main Street/Grayson Avenue (Grayson Avenue terminus alternative only) While traffic volumes would increase at intersections along Oak Avenue, the affected intersections are generally expected to operate at LOS C or better. Specifically, key intersections along the extended segment of Oak Avenue, including Oak Avenue/Grayson Avenue and Oak Avenue/Charter Oak Avenue, are expected to operate at LOS C or better with side-street stop-controlled configurations. The intersections along the existing segment of Oak Avenue are expected to operate at LOS C or better with their existing stop control configurations (i.e. all-way stop-controlled and side-street stop-controlled).

Between the Oak Avenue extension (Grayson Avenue terminus) alternative and Oak Avenue extension (Charter Oak Avenue terminus) alternative, the Charter Oak Avenue terminus provides congestion reduction benefits in a similar manner to the Grayson Avenue terminus alternative.

However, compared to the Grayson Avenue terminus alternative, because the Charter Oak Avenue terminus will extend Oak Avenue over a shorter distance, drivers are expected to experience some delays south of Charter Oak Avenue along Main Street before turning on to Oak Street. Therefore, the congestion reduction benefits would be more modest. For example, at Main Street/Pope StreetMitchell Drive, while the delay is expected to improve substantially with the extension, the weekday AM peak hour is expected to operate at LOS F rather than LOS E; however, the average delay is slightly above the LOS E/F threshold of 80 seconds, indicating that the signal operates only slightly over-capacity. In addition, the Main Street/Charter Oak Avenue intersection meets traffic signal warrant requirements and is expected to operate at LOS C with installation of a traffic signal.

It is noted that the rerouting of traffic volumes would affect traffic movements at additional locations including segments along Main Street between the Oak extension southern terminus (Grayson Avenue or Charter Oak Avenue) and Sulphur Springs Avenue, as volumes are attracted from Sulphur Springs Avenue to take the new Oak Avenue extension. While delays are expected to fluctuate given the shifts in turning movements, affected intersections are expected to operate at a LOS level similar to No Project conditions.

While the traffic volumes would increase at locations along Oak Avenue, the overall volume along the corridor is expected to remain low to moderate. Wayfinding signages would be provided to improve driver awareness of the connection to key community destinations, and the corridor would incorporate traffic calming measures to manage operating speeds and support a livable, multimodal street environment.

Page 222 of 1051 ends

Saint Helena Streets Master Plan Roadway Project Alternatives Analysis | 25 Pope Street Bridge Improvement Alternative
The Pope Street Bridge alternative includes the improvement of the Pope Street Bridge and the realignment of Pope Street to create a single intersection with Silverado Trail and Howell Mountain Road. Improving the Pope Street Bridge will enhance the driving experience as the widened Pope Street Bridge will be more comfortable to navigate. As such, it is expected to attract drivers traveling north and south along Main Street to use a combination of Silverado Trail and Pope Street. However, because these travelers would still need to navigate existing intersections that are congested north of Pope Street, the diversion potential is smaller than the Adams Street alternative and the Oak Avenue alternative.

Intersection operations analysis results with the Pope Street Bridge Improvement alternative indicate that the alternative will provide modest congestion reductions along Main Street. For example, the delays would decrease at Main Street/Pope Street-Mitchell Drive but the LOS would maintain a grade of LOS F for the weekday AM, weekday PM, and weekend MD peak hour; this indicates that, after construction of the Pope Street Bridge improvement, the Main Street corridor would continue to operate in an over-capacity condition. No intersections are projected to improve from unacceptable operations without the Pope Street Bridge improvement to acceptable operations with the improvement.

The Pope Street Bridge Improvement alternative includes realignment of Pope Street to meet Silverado Trail and Howell Mountain Road at a single intersection. This new intersection will need complementary improvements (e.g., traffic control configurations such as traffic signal or roundabout) to operate at LOS D or better.

While traffic volumes would increase at intersections along Pope Street, these intersections are generally expected to continue to operate at a LOS level similar to No Project conditions. However, intersections such as Pope Street/Starr Avenue will need complementary improvements (e.g., traffic control configurations such as all-way stop-controlled) to operate at LOS C or better.

In addition to improving traffic operations, the Pope Street Bridge Improvement alternative would improve walking and biking infrastructure, supporting an enhanced multimodal transportation network.

A summary table presenting the delays and LOS for all study intersections is provided in Appendix A for reference.

Page 223 of 1051 ends

X
Appendix A. Intersection Delay and LOS Table A: Intersection Delay and LOS Int.

ID Intersection
Existing
Traffic
Control
Peak Hour
Existing Conditions Cumulative Conditions
No Project No Project Adams Street Extension
Oak Avenue Extension
Pope Street Bridge
Grayson Avenue Improvement
terminus
Charter Oak
Avenue terminus
Delay (s) LOS Delay (s) LOS Delay (s) LOS Delay (s) LOS Delay (s) LOS Delay (s) LOS 4 Madrona Avenue/Hudson Avenue
SSSC
Weekday AM 4.4 (9.0) A (A) 5.6 (9.5) A (A) 5.6 (9.5) A (A) 5.2 (9.4) A (A) 5.3 (9.4) A (A) 5.6 (9.5) A (A) Weekday PM 2.7 (8.7) A (A) 5.8 (9.1) A (A) 5.8 (9.1) A (A) 5.1 (9.0) A (A) 5.4 (9.0) A (A) 5.8 (9.1) A (A) Weekend MD 3.2 (8.6) A (A) 3.3 (9.0) A (A) 3.3 (9.0) A (A) 2.8 (9.0) A (A) 2.8 (9.0) A (A) 3.3 (9.0) A (A) 5 Spring Street/Valley View Street
SSSC
Weekday AM 8.3 (12.1) A (B) 10.9 (18.2) B (C) 10.9 (18.2) B (C) 10.4 (17.0) B (C) 10.4 (17.2) B (C) 10.9 (18.2) B (C) Weekday PM 5.2 (9.3) A (A) 7.7 (12.0) A (B) 7.7 (12.0) A (B) 7.3 (11.6) A (B) 7.4 (11.7) A (B) 7.7 (12.0) A (B) Weekend MD 5.2 (9.4) A (A) 5.4 (10.0) A (B) 5.4 (10.0) A (B) 5.2 (9.9) A (A) 5.2 (9.9) A (A) 5.4 (10.0) A (B) 6 Grayson Road/Crane Avenue
AWSC
Weekday AM 10.2 B 15.1 C 15.1 C 14.2 (17.5) B (C) 14.4 B 15.1 C Weekday PM 7.8 A 9.4 A 9.4 A 9.0 (9.5) A (A) 9.2 A 9.4 A Weekend MD 7.6 A 8.1 A 8.1 A 8.0 (8.1) A (A) 8.0 A 8.1 A 7 Sulphur Springs Avenue/Crane Avenue
SSSC
Weekday AM 3.3 (9.7) A (A) 5.0 (10.8) A (B) 5.0 (10.8) A (B) 4.7 (10.6) A (B) 4.8 (10.6) A (B) 5.0 (10.8) A (B) Weekday PM 4.8 (9.1) A (A) 5.1 (12.0) A (B) 5.1 (12.0) A (B) 4.8 (11.5) A (B) 4.9 (11.7) A (B) 5.1 (12.0) A (B) Weekend MD 4.8 (9.1) A (A) 5.2 (9.6) A (A) 5.2 (9.6) A (A) 5.1 (9.5) A (A) 5.1 (9.5) A (A) 5.2 (9.6) A (A)

Page 224 of 1051 ends

X
Int.

ID Intersection
Existing
Traffic
Control
Peak Hour
Existing Conditions Cumulative Conditions
No Project No Project Adams Street Extension
Oak Avenue Extension
Pope Street Bridge
Grayson Avenue Improvement
terminus
Charter Oak
Avenue terminus
Delay (s) LOS Delay (s) LOS Delay (s) LOS Delay (s) LOS Delay (s) LOS Delay (s) LOS 8 Main Street/Pratt Avenue SSSC
Weekday AM 1.7 (41.7) A (E) 4.4 (103.3) A (F) 4.4 (103.3) A (F) 4.4 (103.3) A (F) 4.4 (103.3) A (F) 4.4 (103.3) A (F) Weekday PM 1.7 (44.1) A (E) 50.4 (>120) F (F) 50.4 (>120) F (F) 50.4 (>120) F (F) 50.4 (188.2) F (F) 50.4 (>120) F (F) Weekend MD 1.2 (31.0) A (D) 2.6 (44.6) A (E) 2.6 (44.6) A (E) 2.6 (44.6) A (E) 2.6 (44.6) A (E) 2.6 (44.6) A (E) 9 Main Street/Elmhurst Avenue
SSSC
Weekday AM 2.1 (32.6) A (D) 2.5 (65.5) A (F) 2.5 (65.5) A (F) 2.5 (65.5) A (F) 2.5 (65.5) A (F) 2.5 (65.5) A (F) Weekday PM 1.5 (35.2) A (E) 19.7 (>120) C (F) 19.7 (>120) C (F) 19.7 (>120) C (F) 19.7 (>120) C (F) 19.7 (>120) C (F) Weekend MD 1.2 (24.6) A (C) 1.7 (31.0) A (D) 1.7 (31.0) A (D) 1.7 (31.0) A (D) 1.7 (31.0) A (D) 1.7 (31.0) A (D) 10 Main Street/Madrona Avenue-Fulton Lane
Signal
Weekday AM 18.0 B 49.0 D 49.0 D 54.0 D 57.1 E 49.0 D
Weekday PM 14.4 B 25.3 C 25.3 C 34.8 C 34.5 C 25.3 C
Weekend MD 33.5 C 33.6 C 25.4 C 27.5 C 27.5 C 33.6 C
11 Fulton Lane/Railroad Avenue
SSSC
Weekday AM 4.8 (10.3) A (B) 4.8 (11.4) A (B) 4.8 (11.4) A (B) 4.8 (11.4) A (B) 4.8 (11.4) A (B) 4.8 (11.4) A (B) Weekday PM 6.7 (10.4) A (B) 6.4 (11.2) A (B) 6.4 (11.2) A (B) 6.4 (11.2) A (B) 6.4 (11.2) A (B) 6.4 (11.2) A (B) Weekend MD 5.8 (9.5) A (A) 5.7 (9.8) A (A) 5.7 (9.8) A (A) 5.7 (9.8) A (A) 5.7 (9.8) A (A) 5.7 (9.8) A (A) 12 Main Street/Adams Street
Signal
Weekday AM 22.5 C 35.2 D 38.1 D 35.3 D 35.8 D 35.2 D
Weekday PM 23.6 C 34.3 C 44.1 D 37.2 D 37.7 D 34.3 C
Weekend MD 41.9 D 59.2 E 41.1 D 37.6 D 37.6 D 59.2 E

Page 225 of 1051 ends

X
Int.

ID Intersection
Existing
Traffic
Control
Peak Hour
Existing Conditions Cumulative Conditions
No Project No Project Adams Street Extension
Oak Avenue Extension
Pope Street Bridge
Grayson Avenue Improvement
terminus
Charter Oak
Avenue terminus
Delay (s) LOS Delay (s) LOS Delay (s) LOS Delay (s) LOS Delay (s) LOS Delay (s) LOS 13 Adams Street/Railroad Avenue
AWSC
Weekday AM 9.2 (9.8) A (A) 11.4 B 17.6 C 11.4 B 11.4 B 11.4 B Weekday PM 9.4 (9.6) A (A) 12.8 B 20.2 C 12.8 B 12.8 B 12.8 B Weekend MD 7.9 (8.2) A (A) 8.1 A 9.6 A 8.1 A 8.1 A 8.1 A 14 Adams Street/Library Lane
SSSC
Weekday AM 2.0 (9.4) A (A) 2.2 (10.9) A (B) 1.2 (15.0) A (C) 2.2 (10.9) A (B) 2.2 (10.9) A (B) 2.2 (10.9) A (B) Weekday PM 4.0 (9.7) A (A) 5.3 (11.4) A (B) 3.8 (14.2) A (B) 5.3 (11.4) A (B) 5.3 (11.4) A (B) 5.3 (11.4) A (B) Weekend MD 5.3 (9.2) A (A) 5.1 (9.4) A (A) 1.5 (12.3) A (B) 5.1 (9.4) A (A) 5.1 (9.4) A (A) 5.1 (9.4) A (A) 15 Main Street/Hunt Avenue SSSC
Weekday AM 0.7 (16.3) A (C) 1.0 (20.3) A (C) 1.0 (16.9) A (C) 1.0 (17.9) A (C) 1.0 (17.9) A (C) 1.0 (20.3) A (C) Weekday PM 1.0 (17.0) A (C) 1.9 (25.9) A (D) 1.8 (21.4) A (C) 1.9 (22.8) A (C) 1.9 (22.9) A (C) 1.9 (25.9) A (D) Weekend MD 0.9 (23.9) A (C) 1.2 (26.5) A (D) 1.3 (22.6) A (C) 1.2 (24.1) A (C) 1.2 (24.1) A (C) 1.2 (26.5) A (D) 16 Hunt Avenue/Railroad Avenue
SSSC
Weekday AM 8.4 (16.7) A (C) 6.7 (18.3) A (C) 6.7 (18.3) A (C) 6.7 (18.3) A (C) 6.7 (18.3) A (C) 6.7 (18.3) A (C) Weekday PM 8.7 (15.5) A (C) 7.6 (16.7) A (C) 7.6 (16.7) A (C) 7.6 (16.7) A (C) 7.6 (16.7) A (C) 7.6 (16.7) A (C) Weekend MD 6.7 (12.3) A (B) 7.2 (13.5) A (B) 7.2 (13.5) A (B) 7.2 (13.5) A (B) 7.2 (13.5) A (B) 7.2 (13.5) A (B) 17 Mitchell Drive/Oak Avenue SSSC
Weekday AM 5.7 (9.8) A (A) 5.6 (10.3) A (B) 5.6 (10.3) A (B) 11.1 (17.3) B (C) 9.5 (14.0) A (B) 5.6 (10.3) A (B) Weekday PM 5.0 (9.7) A (A) 5.7 (10.5) A (B) 5.7 (10.5) A (B) 10.2 (16.2) B (C) 9.5 (15.1) A (C) 5.7 (10.5) A (B) Weekend MD 5.0 (9.3) A (A) 5.1 (9.6) A (A) 5.1 (9.6) A (A) 8.0 (12.4) A (B) 8.2 (12.7) A (B) 5.1 (9.6) A (A)

Page 226 of 1051 ends

X
Int.

ID Intersection
Existing
Traffic
Control
Peak Hour
Existing Conditions Cumulative Conditions
No Project No Project Adams Street Extension
Oak Avenue Extension
Pope Street Bridge
Grayson Avenue Improvement
terminus
Charter Oak
Avenue terminus
Delay (s) LOS Delay (s) LOS Delay (s) LOS Delay (s) LOS Delay (s) LOS Delay (s) LOS 18 Main Street/Pope Street-Mitchell Drive
Signal
Weekday AM 115.6 F >120 F 71.7 E 63.5 E 81.3 F >120 F
Weekday PM 97.8 F >120 F 75.6 E 68.9 E 78.7 E >120 F
Weekend MD 100.5 F 109.3 F 66.1 E 63.6 E 68.9 E 93.4 F
19 Main Street/Grayson Avenue
Signal
Weekday AM 37.6 D 68.5 E 48.9 D 38.6 D 71.9 E 65.0 E
Weekday PM 19.6 B 52.9 D 42.4 D 43.0 D 55.6 E 50.8 D
Weekend MD 23.4 C 28.7 C 19.8 B 24.3 C 29.3 C 25.5 C
20 Main Street/Sulphur Springs Avenue
SSSC
Weekday AM 1.2 (16.3) A (C) 2.1 (23.5) A (C) 2.1 (20.7) A (C) 1.8 (23.0) A (C) 1.9 (23.1) A (C) 2.1 (23.1) A (C) Weekday PM 1.0 (16.4) A (C) 3.4 (33.2) A (D) 3.2 (29.1) A (D) 2.8 (31.3) A (D) 3.0 (31.9) A (D) 3.4 (32.5) A (D) Weekend MD 0.7 (16.0) A (C) 0.8 (17.7) A (C) 0.9 (16.0) A (C) 0.8 (17.7) A (C) 0.8 (17.7) A (C) 0.8 (17.5) A (C) 21 Hunt Avenue/Starr Avenue AWSC
Weekday AM 7.3 A 7.9 A 7.9 A 7.9 A 7.9 A 7.9 A
Weekday PM 7.1 A 7.7 A 7.7 A 7.7 A 7.7 A 7.7 A
Weekend MD 7.1 A 7.3 A 7.3 A 7.3 A 7.3 A 7.3 A
22 Pope Street/Starr Avenue SSSC
Weekday AM 2.1 (14.9) A (B) 3.8 (23.3) A (C) 3.5 (20.0) A (C) 3.8 (23.3) A (C) 3.8 (23.3) A (C) 3.9 (25.0) A (D) Weekday PM 2.3 (12.2) A (B) 3.5 (19.9) A (C) 3.5 (17.6) A (C) 3.5 (19.9) A (C) 3.5 (19.9) A (C) 3.6 (20.6) A (C) Weekend MD 1.3 (10.8) A (B) 1.6 (11.9) A (B) 1.7 (11.4) A (B) 1.6 (11.9) A (B) 1.6 (11.9) A (B) 1.6 (12.1) A (B)

Page 227 of 1051 ends

X
Int.

ID Intersection
Existing
Traffic
Control
Peak Hour
Existing Conditions Cumulative Conditions
No Project No Project Adams Street Extension
Oak Avenue Extension
Pope Street Bridge
Grayson Avenue Improvement
terminus
Charter Oak
Avenue terminus
Delay (s) LOS Delay (s) LOS Delay (s) LOS Delay (s) LOS Delay (s) LOS Delay (s) LOS 23 Pope Street/Paseo Grande DriveCollege Avenue SSSC
Weekday AM 7.0 (23.4) A (C) 15.9 (78.6) C (F) 12.1 (52.8) B (F) 15.9 (78.6) C (F) 15.9 (78.6) C (F) 18.1 (94.0) C (F) Weekday PM 2.6 (12.6) A (B) 2.7 (17.9) A (C) 2.7 (16.2) A (C) 2.7 (17.9) A (C) 2.7 (17.9) A (C) 2.7 (18.4) A (C) Weekend MD 2.1 (11.4) A (B) 2.8 (13.8) A (B) 3.0 (13.1) A (B) 2.8 (13.8) A (B) 2.8 (13.8) A (B) 2.8 (14.2) A (B) 24 Silverado Trail/Pratt Avenue SSSC
Weekday AM 0.5 (12.7) A (B) 0.9 (23.4) A (C) 0.9 (23.4) A (C) 0.9 (23.4) A (C) 0.9 (23.4) A (C) 0.9 (23.4) A (C) Weekday PM 0.6 (13.9) A (B) 2.0 (45.7) A (E) 2.0 (45.7) A (E) 2.0 (45.7) A (E) 2.0 (45.7) A (E) 2.0 (45.7) A (E) Weekend MD 0.5 (12.3) A (B) 0.8 (17.0) A (C) 0.8 (17.0) A (C) 0.8 (17.0) A (C) 0.8 (17.0) A (C) 0.8 (17.0) A (C) 25 Silverado Trail/Howell Mountain Road
SSSC*
Weekday AM 0.5 (14.0) A (B) 0.6 (16.9) A (C) 0.6 (18.9) A (C) 0.6 (16.9) A (C) 0.6 (16.9) A (C) 38.2 D Weekday PM 0.5 (13.8) A (B) 1.0 (24.6) A (C) 1.0 (26.1) A (D) 1.0 (24.6) A (C) 1.0 (24.6) A (C) 53.4 D Weekend MD 0.5 (13.3) A (B) 0.8 (16.1) A (C) 0.7 (17.9) A (C) 0.8 (16.1) A (C) 0.8 (16.1) A (C) 23.4 C 26 Silverado Trail/Pope Street SSSC*
Weekday AM 3.7 (18.8) A (C) 9.6 (54.8) A (F) 9.3 (66.7) A (F) 9.6 (54.8) A (F) 9.6 (54.8) A (F) - - Weekday PM 3.3 (19.4) A (C) 25.6 (>120) D (F) 24.3 (>120) C (F) 25.6 (>120) D (F) 25.6 (138.4) D (F) - - Weekend MD 2.1 (14.3) A (B) 2.9 (20.2) A (C) 2.4 (23.4) A (C) 2.9 (20.2) A (C) 2.9 (20.2) A (C) - - 27 Main Street/Mills Lane SSSC
Weekday AM 0.1 (21.1) A (C) 0.2 (19.4) A (C) 0.2 (17.4) A (C) 0.2 (16.6) A (C) 0.2 (19.6) A (C) 0.2 (19.0) A (C) Weekday PM 0.1 (14.7) A (B) 2.1 (95.5) A (F) 1.6 (68.8) A (F) 1.5 (57.7) A (F) 2.2 (103) A (F) 2.0 (90.6) A (F) Weekend MD 0.1 (14.1) A (B) 0.2 (15.2) A (C) 0.2 (14.0) A (B) 0.2 (14.1) A (B) 0.2 (15.3) A (C) 0.2 (15.1) A (C)

Page 228 of 1051 ends

X
Int.

ID Intersection
Existing
Traffic
Control
Peak Hour
Existing Conditions Cumulative Conditions
No Project No Project Adams Street Extension
Oak Avenue Extension
Pope Street Bridge
Grayson Avenue Improvement
terminus
Charter Oak
Avenue terminus
Delay (s) LOS Delay (s) LOS Delay (s) LOS Delay (s) LOS Delay (s) LOS Delay (s) LOS 28 Main Street/Charter Oak Avenue
SSSC**
Weekday AM 5.3 (>120) A (F) 36.4 (111.6) E (F) 22.7 (71.0) C (F) 16.7 (56.3) C (F) 31.1 C 33.7 (103.0) D (F) Weekday PM 6.9 (119.2) A (F) 48.4 (>120) E (F) 33.8 (99.1) D (F) 27.0 (78.2) C (F) 29.8 C 45.8 (>120) E (F) Weekend MD 5.3 (89.3) A (F) 19.0 (>120) C (F) 10.7 (>120) B (F) 11.3 (>120) B (F) 27.6 C 17.8 (>120) C (F) 29 Oak Avenue/Pine Street AWSC
Weekday AM 8.1 A 9.0 A 9.0 A 12.4 B 12.1 B 9.0 A
Weekday PM 7.5 A 8.0 A 8.0 A 9.2 A 9.0 A 8.0 A
Weekend MD 7.4 A 7.7 A 7.7 A 8.4 A 8.4 A 7.7 A
30 Oak Avenue/Adams Street
AWSC
Weekday AM 9.6 A 11.7 B 11.7 B 20.9 C 20 C 11.7 B
Weekday PM 8.3 A 9.3 A 9.3 A 11.3 B 10.9 B 9.3 A
Weekend MD 7.9 A 8.8 A 8.8 A 10 A 10 A 8.8 A
31 Oak Avenue/Spring Street
AWSC
Weekday AM 9.5 A 11.2 B 11.2 B 24.1 C 17.4 C 11.2 B
Weekday PM 8.7 A 9.9 A 9.9 A 13.1 B 11.8 B 9.9 A
Weekend MD 8.1 A 9.0 A 9.0 A 10.6 B 10.3 B 9.0 A
32 Main Street/Spring Street
SSSC
Weekday AM 2.0 (16.7) A (C) 2.8 (24.6) A (C) 2.8 (19.6) A (C) 5.2 (32.0) A (D) 2.8 (20.4) A (C) 2.8 (24.6) A (C) Weekday PM 1.7 (17.6) A (C) 2.3 (25.0) A (D) 2.3 (21.0) A (C) 3.7 (29.2) A (D) 2.3 (22.1) A (C) 2.3 (25.0) A (D) Weekend MD 1.9 (27.5) A (D) 3.3 (37.0) A (E) 3.3 (29.3) A (D) 3.7 (33.8) A (D) 3.2 (31.7) A (D) 3.3 (37.0) A (E)

Page 229 of 1051 ends

X
Int.

ID Intersection
Existing
Traffic
Control
Peak Hour
Existing Conditions Cumulative Conditions
No Project No Project Adams Street Extension
Oak Avenue Extension
Pope Street Bridge
Grayson Avenue Improvement
terminus
Charter Oak
Avenue terminus
Delay (s) LOS Delay (s) LOS Delay (s) LOS Delay (s) LOS Delay (s) LOS Delay (s) LOS 33 Pope Street/Church Street
SSSC
Weekday AM 1.9 (12.1) A (B) 2.9 (15.5) A (C) 2.9 (14.3) A (B) 2.9 (15.5) A (C) 2.9 (15.5) A (C) 2.8 (16.1) A (C) Weekday PM 3.3 (12.1) A (B) 4.3 (15.4) A (C) 4.4 (14.2) A (B) 4.3 (15.4) A (C) 4.3 (15.4) A (C) 4.3 (15.8) A (C) Weekend MD 2.4 (11.4) A (B) 3.1 (13.8) A (B) 3.3 (13.0) A (B) 3.1 (13.8) A (B) 3.1 (13.8) A (B) 3.1 (14.1) A (B) 34 Silverado Trail/Adams Street
Signal
Weekday AM
Intersection Does Not
Exist in this Scenario
Intersection Does Not
Exist in this Scenario

18.1 B
Intersection Does
Not Exist in this
Scenario
Intersection Does
Not Exist in this
Scenario
Intersection Does
Not Exist in this
Scenario
Weekday PM 17.9 B
Weekend MD 14.6 B
35 Oak Avenue/ Grayson Avenue SSSC
Weekday AM
Intersection Does Not
Exist in this Scenario
Intersection Does Not
Exist in this Scenario
Intersection Does
Not Exist in this
Scenario

4.9 (13.2)
A
(B)
Intersection Does
Not Exist in this
Scenario
Intersection Does
Not Exist in this
Scenario
Weekday PM 3.8 (11.7) A (B)
Weekend MD 3.7 (9.9) A (A)
36 Oak Avenue/Charter Oak Avenue
SSSC
Weekday AM
Intersection Does Not
Exist in this Scenario
Intersection Does Not
Exist in this Scenario
Intersection Does
Not Exist in this
Scenario

3.7 (12.7)
A
(B)

4.0 (10.2)
A
(B)
Intersection Does
Not Exist in this
Scenario
Weekday PM 4.0 (12.0) A (B) 3.6 (9.9) A (A)
Weekend MD 5.1 (11.3) A (B) 3.5 (10.0) A (A)
Notes: * Silverado Trail/Howell Mountain Road-Pope Street has been modeled as one signalized intersection under Pope Street Bridge Improvement Alternative Scenario as an operational improvement. The County may also consider converting this intersection to a roundabout as described in the Napa County General Plan. ** Main Street/Charter Oak Avenue has been modeled as one signalized intersection under the Oak Avenue Extension (Charter Oak Avenue terminus) Alternative Scenario as an operational improvement. 1. Delay for signalized and all-way stop-controlled intersections presented as whole-intersection average delay. Delay for side-street stop-controlled intersections presented as whole-intersection average delay (delay on worst movement or single-lane approach).

2. LOS per Highway Capacity Manual, 7th Edition

3. Bold indicates unacceptable operations.

4. AWSC = All-Way Stop-Controlled, SSSC = Side-Street Stop-Controlled.

Source: Fehr & Peers, 2026.

Page 230 of 1051 ends

X
Appendix B. Traffic Counts

Page 231 of 1051 ends

Prepared by National Data & Surveying Services
ID: 25-080213-001 Day:

City: St Helena Date:

AM 0 30 43 1 AM
NOON 0 0 0 0 NOON
PM 0 18 12 0 PM

AM NOON PM PM NOON AM
0 1 0 0 0 13 0 18
1 0 0 0
0 0 0 0 0 4 0 6
0 0 0 0 TEV 125 0 89 0 0 0 0
0 0 0 0 PHF 0.76 0.82
0 0 0 0
0 0 1 0

AM NOON PM PM NOON AM
PM 0 0 33 9 PM
NOON 0 0 0 0 NOON
AM 0 0 24 3 AM
0 NONE
04:15 PM - 05:15 PM 46
Madrona Ave & Hudson Ave
Peak Hour Turning Movement Count
Madrona Ave Tuesday
SOUTHBOUND 5/27/2025 PEAK HOURS 4:00 PM - 06:00 PM
07:30 AM - 08:30 AM 43 7:00 AM - 09:00 AM COUNT PERIODS NONE 21 0 46
Cars (AM) 22 HT (AM) Hudson Ave EASTBOUNDWESTBOUND Hudson Ave 0 0 0

CONTROL
1-Way Stop(WB)
Pedestrians (Crosswalks)
Cars (PM) HT (PM)
0 36

NORTHBOUND
Madrona Ave
Cars (NOON) HT (NOON)

AM NOON PM
PM
AM
AM
NOON
PM
PM
NOON
AM
AM
NOON
PM

NOON PMNOON AMAMNOON PM PMNOON AMAMNOON PM
0 0
0 0
0 0
00 100 0
0 0
4 0
0 5
00 000 0
0 0
0 0
0 0
000
000
0 0
0 0
0 0
000
000
0 0
0 0
0 0
041
011
13 0
0 4
0 0
01812
0339
0 0
0 0
0 0
000
000
18 0
0 6
0 0
02642
0232

Page 232 of 1051 ends

Prepared by National Data & Surveying Services
ID: 25-080213-001 Day:

City: St Helena Date:

AM 0 0 0 0 AM
NOON 0 9 13 0 NOON
PM 0 0 0 0 PM

AM NOON PM PM NOON AM
0 1 0 0 0 0 14 0
1 0 0 0
0 0 0 0 0 0 2 0
0 0 0 0 TEV 0 55 0 0 0 0 0
0 0 0 0 PHF 0.72
0 0 0 0
0 0 1 0

AM NOON PM PM NOON AM
PM 0 0 0 0 PM
NOON 0 0 12 5 NOON
AM 0 0 0 0 AM
Pedestrians (Crosswalks)
Cars (PM) HT (PM)
11 0

NORTHBOUND
Madrona Ave
Cars (NOON) HT (NOON)
12:45 PM - 01:45 PM
0 18 0
Cars (AM) 0 HT (AM) Hudson Ave EASTBOUNDWESTBOUND Hudson Ave 0 0 0

CONTROL
1-Way Stop(WB)
26 12:00 PM - 02:00 PM
NONE 0
Madrona Ave & Hudson Ave
Peak Hour Turning Movement Count
Madrona Ave Saturday
SOUTHBOUND 6/7/2025 PEAK HOURS NONE
NONE 0 NONE COUNT PERIODS

AM NOON PM
PM
AM
AM
NOON
PM
PM
NOON
AM
AM
NOON
PM

NOON PMNOON AMAMNOON PM PMNOON AMAMNOON PM
0 0
0 0
0 0 0 20 0 00
0 3
0 0
0 0 0 00 0 00
0 0
0 0
0 0
000
000
0 0
0 0
0 0
000
000
0 0
0 0
0 0
000
000
0 0
0 0
0 0
000
000
14 0
0 2
0 0
0913
0125
0 0
0 0
0 0
000
000

Page 233 of 1051 ends

Prepared by National Data & Surveying Services
ID: 25-080213-002 Day:

City: St Helena Date:

AM 0 41 165 0 AM
NOON 0 0 0 0 NOON
PM 0 27 59 0 PM

AM NOON PM PM NOON AM
0 1 0 0 0 62 0 207
1 0 0 0
0 0 0 0 0 17 0 24
0 0 0 0 TEV 494 0 228 0 0 0 0
0 0 0 0 PHF 0.69 0.86
0 0 0 0
0 0 1 0

AM NOON PM PM NOON AM
PM 0 0 41 22 PM
NOON 0 0 0 0 NOON
AM 0 0 38 19 AM
Pedestrians (Crosswalks)
Cars (PM) HT (PM)
0 65

NORTHBOUND
Spring St
Cars (NOON) HT (NOON)
NONE
81 0 184
Cars (AM) 44 HT (AM) Valley View St EASTBOUNDWESTBOUND Valley View St 0 0 0

CONTROL
1-Way Stop(WB)
0 NONE
04:00 PM - 05:00 PM 103
Spring St & Valley View St
Peak Hour Turning Movement Count
Spring St Tuesday
SOUTHBOUND 5/27/2025 PEAK HOURS 4:00 PM - 06:00 PM
07:45 AM - 08:45 AM 245 7:00 AM - 09:00 AM COUNT PERIODS

AM NOON PM
PM
AM
AM
NOON
PM
PM
NOON
AM
AM
NOON
PM

NOON PMNOON AMAMNOON PM PMNOON AMAMNOON PM
0 0
0 0
0 0
00 000 0
1 0
0 1
0 3
00 000 0
0 0
0 0
0 0
001
000
0 0
0 0
0 0
000
000
10 0
0 1
0 0
007
011
62 0
0 17
0 0
02758
04122
0 0
0 0
0 0
000
000
197
0 0 23
0 0
041158
03718

Page 234 of 1051 ends

Prepared by National Data & Surveying Services
ID: 25-080213-002 Day:

City: St Helena Date:

AM 0 0 0 0 AM
NOON 0 24 24 1 NOON
PM 0 0 0 0 PM

AM NOON PM PM NOON AM
0 1 0 0 0 0 64 0
1 0 0 0
0 0 0 0 0 0 23 0
0 0 0 0 TEV 0 193 0 0 0 0 0
0 0 0 0 PHF 0.71
0 0 0 0
0 0 1 0

AM NOON PM PM NOON AM
PM 0 0 0 0 PM
NOON 0 0 28 29 NOON
AM 0 0 0 0 AM
Pedestrians (Crosswalks)
Cars (PM) HT (PM)
47 0

NORTHBOUND
Spring St
Cars (NOON) HT (NOON)
12:00 PM - 01:00 PM
0 53 0
Cars (AM) 0 HT (AM) Valley View St EASTBOUNDWESTBOUND Valley View St 0 0 0

CONTROL
1-Way Stop(WB)
93 12:00 PM - 02:00 PM
NONE 0
Spring St & Valley View St
Peak Hour Turning Movement Count
Spring St Saturday
SOUTHBOUND 5/31/2025 PEAK HOURS NONE
NONE 0 NONE COUNT PERIODS

AM NOON PM
PM
AM
AM
NOON
PM
PM
NOON
AM
AM
NOON
PM

NOON PMNOON AMAMNOON PM PMNOON AMAMNOON PM
0 0
0 0
0 0 0 00 0 00
0 0
0 0
0 0 0 00 0 00
0 0
0 0
0 0
000
000
0 0
0 1
0 0
001
001
0 0
0 0
0 0
000
000
0 0
0 0
0 0
000
000
64 0
0 22
0 0
02423
02828
0 0
0 0
0 0
000
000

Page 235 of 1051 ends

Prepared by National Data & Surveying Services
ID: 25-080213-003 Day:

City: St Helena Date:

AM 133 0 20 0 AM
NOON 0 0 0 0 NOON
PM 33 0 43 0 PM

AM NOON PM PM NOON AM
0 1 0 0 0 10 0 34
1 51 0 103
0 0 0 0 0 0 0 0
162 0 20 0 TEV 517 0 249 0 0 0 0
64 0 91 1 PHF 0.72 0.86
0 0 0 0
0 0 1 0

AM NOON PM PM NOON AM
PM 0 0 1 0 PM
NOON 0 0 0 0 NOON
AM 0 1 0 0 AM
Pedestrians (Crosswalks)
Cars (PM) HT (PM)
0 0

NORTHBOUND
Grayson Ave
Cars (NOON) HT (NOON)
NONE
134 0 84
Cars (AM) 0 HT (AM) S Crane Ave EASTBOUNDWESTBOUND S Crane Ave 237 0 84

CONTROL
4-Way Stop
0 NONE
05:00 PM - 06:00 PM 31
Grayson Ave & S Crane Ave
Peak Hour Turning Movement Count
Grayson Ave Tuesday
SOUTHBOUND 5/27/2025 PEAK HOURS 4:00 PM - 06:00 PM
07:45 AM - 08:45 AM 196 7:00 AM - 09:00 AM COUNT PERIODS

AM NOON PM
PM
AM
AM
NOON
PM
PM
NOON
AM
AM
NOON
PM

NOON PMNOON AMAMNOON PM PMNOON AMAMNOON PM
0 0
0 0
0 0
20 100 1
1 0
0 0
0 0
00 220 2
1 0
0 0
0 1
000
000
0 0
0 0
0 0
000
000
0 5
0 0
2 5
300
000
9 51
0 0
91 19 33
043
010
0 0
0 0
0 0
000
000
34 98
0 0
62 157 130
020
100

Page 236 of 1051 ends

Prepared by National Data & Surveying Services
ID: 25-080213-003 Day:

City: St Helena Date:

AM 0 0 0 0 AM
NOON 23 0 13 0 NOON
PM 0 0 0 0 PM

AM NOON PM PM NOON AM
0 1 0 0 0 0 19 0
1 0 66 0
0 0 0 0 0 0 0 0
0 8 0 0 TEV 0 184 0 0 0 1 0
0 52 0 1 PHF 0.68
0 1 0 0
0 0 1 0

AM NOON PM PM NOON AM
PM 0 0 0 0 PM
NOON 0 1 0 0 NOON
AM 0 0 0 0 AM
Pedestrians (Crosswalks)
Cars (PM) HT (PM)
1 0

NORTHBOUND
Grayson Ave
Cars (NOON) HT (NOON)
12:00 PM - 01:00 PM
0 66 0
Cars (AM) 0 HT (AM) S Crane Ave EASTBOUNDWESTBOUND S Crane Ave 0 90 0

CONTROL
4-Way Stop
27 12:00 PM - 02:00 PM
NONE 0
Grayson Ave & S Crane Ave
Peak Hour Turning Movement Count
Grayson Ave Saturday
SOUTHBOUND 5/31/2025 PEAK HOURS NONE
NONE 0 NONE COUNT PERIODS

AM NOON PM
PM
AM
AM
NOON
PM
PM
NOON
AM
AM
NOON
PM

NOON PMNOON AMAMNOON PM PMNOON AMAMNOON PM
0 0
0 0
0 0 0 00 0 00
0 0
0 0
0 0 0 10 0 00
0 0
0 0
0 0
000
000
0 0
0 0
1 0
100
000
0 0
0 0
0 0
000
000
0 0
0 0
0 0
000
000
19 66
1 0
51 8 22
013
100
0 0
0 0
0 0
000
000

Page 237 of 1051 ends

Prepared by National Data & Surveying Services
ID: 25-080213-004 Day:

City: St Helena Date:

AM 119 14 0 0 AM
NOON 0 0 0 0 NOON
PM 48 3 0 0 PM

AM NOON PM PM NOON AM
0 1 0 0 0 0 0 0
0 0 0 0
0 0 0 0 0 0 0 0
63 0 57 0 TEV 207 0 115 0 0 0 0
0 0 0 1 PHF 0.72 0.78
3 0 2 0
0 0 1 0

AM NOON PM PM NOON AM
PM 0 2 3 0 PM
NOON 0 0 0 0 NOON
AM 0 5 3 0 AM
Pedestrians (Crosswalks)
Cars (PM) HT (PM)
0 17

NORTHBOUND
Sulphur Springs Ave
Cars (NOON) HT (NOON)
NONE
0 0 0
Cars (AM) 5 HT (AM) S Crane Ave EASTBOUNDWESTBOUND S Crane Ave 124 0 50

CONTROL
1-Way Stop(EB)
0 NONE
04:00 PM - 05:00 PM 60
Sulphur Springs Ave & S Crane Ave
Peak Hour Turning Movement Count
Sulphur Springs Ave Tuesday
SOUTHBOUND 5/27/2025 PEAK HOURS 4:00 PM - 06:00 PM
07:45 AM - 08:45 AM 66 7:00 AM - 09:00 AM COUNT PERIODS

AM NOON PM
PM
AM
AM
NOON
PM
PM
NOON
AM
AM
NOON
PM

NOON PMNOON AMAMNOON PM PMNOON AMAMNOON PM
0 0
1 0
0 1
00 000 0
0 0
0 0
0 0
00 100 0
0 0
0 0
0 2
000
000
0 0
0 0
0 0
000
000
0 0
0 0
0 1
400
000
0 0
2 0
0 55 48
30 230
0 0
0 0
0 0
000
000
0 0
3 0
0 62 115 14
0 530

Page 238 of 1051 ends

Prepared by National Data & Surveying Services
ID: 25-080213-004 Day:

City: St Helena Date:

AM 0 0 0 0 AM
NOON 38 5 0 1 NOON
PM 0 0 0 0 PM

AM NOON PM PM NOON AM
0 1 0 0 0 0 0 0
0 0 0 0
0 0 0 0 0 0 0 0
0 49 0 0 TEV 0 103 0 0 0 0 0
0 0 0 1 PHF 0.68
0 1 0 0
0 0 1 0

AM NOON PM PM NOON AM
PM 0 0 0 0 PM
NOON 0 5 4 0 NOON
AM 0 0 0 0 AM
Pedestrians (Crosswalks)
Cars (PM) HT (PM)
6 0

NORTHBOUND
Sulphur Springs Ave
Cars (NOON) HT (NOON)
12:00 PM - 01:00 PM
0 0 0
Cars (AM) 0 HT (AM) S Crane Ave EASTBOUNDWESTBOUND S Crane Ave 0 43 0

CONTROL
1-Way Stop(EB)
54 12:00 PM - 02:00 PM
NONE 0
Sulphur Springs Ave & S Crane Ave
Peak Hour Turning Movement Count
Sulphur Springs Ave Saturday
SOUTHBOUND 5/31/2025 PEAK HOURS NONE
NONE 0 NONE COUNT PERIODS

AM NOON PM
PM
AM
AM
NOON
PM
PM
NOON
AM
AM
NOON
PM

NOON PMNOON AMAMNOON PM PMNOON AMAMNOON PM
0 0
0 0
0 0 0 00 0 00
0 0
0 0
0 0 0 00 0 00
0 0
0 0
0 0
000
000
0 0
0 0
0 1
000
000
0 0
0 0
0 0
000
000
0 0
0 0
0 0
000
000
0 0
1 0
0 48 38
50 540
0 0
0 0
0 0
000
000

Page 239 of 1051 ends

Prepared by National Data & Surveying Services
ID: 25-080213-005 Day:

City: St Helena Date:

AM 19 0 30 0 AM
NOON 0 0 0 0 NOON
PM 20 1 20 0 PM

AM NOON PM PM NOON AM
0 1 0 0 0 17 0 27
1 648 0 493
0 0 0 0 1 5 0 6
19 0 22 1 TEV 1231 0 1221 0 0 0 0
634 0 472 1 PHF 0.95 0.87
1 0 2 0
0 0 1 0

AM NOON PM PM NOON AM
PM 0 1 1 12 PM
NOON 0 0 0 0 NOON
AM 0 0 0 2 AM
Pedestrians (Crosswalks)
Cars (PM) HT (PM)
0 7

NORTHBOUND
Pratt Ave/Violetto - Californian restaurant Dwy
Cars (NOON) HT (NOON)
NONE
504 0 666
Cars (AM) 8 HT (AM) St Helena Hwy/SR 128/Main St/SR 29 EASTBOUNDWESTBOUND St Helena Hwy/SR 128/Main St/SR 29 512 0 669

CONTROL
1-Way Stop(SB)
0 NONE
04:15 PM - 05:15 PM 40
Pratt Ave/Violetto - Californian restaurant Dwy & St Helena Hwy/SR 128/Main St/SR 29 Peak Hour Turning Movement Count
Pratt Ave/Violetto - Californian restaurant Dwy Tuesday SOUTHBOUND 5/27/2025 PEAK HOURS 4:00 PM - 06:00 PM
07:45 AM - 08:45 AM 46 7:00 AM - 09:00 AM COUNT PERIODS

AM NOON PM
PM
AM
AM
NOON
PM
PM
NOON
AM
AM
NOON
PM

NOON PMNOON AMAMNOON PM PMNOON AMAMNOON PM
0 0
0 0
0 0 110 0130 1
0 0
0 0
0 5
00 110 1
0 17
1 0
12 0
000
010
0 0
0 0
0 0
000
000
1 56
1 0
41 1
101
001
17 631
1 5
460
22 20
120
1012
0 0
0 0
0 0
000
000
26 437
0 6
593
18 18
029
001

Page 240 of 1051 ends

Prepared by National Data & Surveying Services
ID: 25-080213-005 Day:

City: St Helena Date:

AM 0 0 0 0 AM
NOON 12 0 20 0 NOON
PM 0 0 0 0 PM

AM NOON PM PM NOON AM
0 1 0 0 0 0 22 0
1 0 587 0
0 0 0 0 1 0 14 0
0 11 0 1 TEV 0 1233 0 0 0 0 0
0 548 0 1 PHF 0.96
0 5 0 0
0 0 1 0

AM NOON PM PM NOON AM
PM 0 0 0 0 PM
NOON 0 5 1 8 NOON
AM 0 0 0 0 AM
Pedestrians (Crosswalks)
Cars (PM) HT (PM)
19 0

NORTHBOUND
Pratt Ave/Violetto - Californian restaurant Dwy
Cars (NOON) HT (NOON)
12:00 PM - 01:00 PM
0 576 0
Cars (AM) 0 HT (AM) St Helena Hwy/SR 128/Main St/SR 29 EASTBOUNDWESTBOUND St Helena Hwy/SR 128/Main St/SR 29 0 604 0

CONTROL
1-Way Stop(SB)
34 12:00 PM - 02:00 PM
NONE 0
Pratt Ave/Violetto - Californian restaurant Dwy & St Helena Hwy/SR 128/Main St/SR 29 Peak Hour Turning Movement Count
Pratt Ave/Violetto - Californian restaurant Dwy Saturday SOUTHBOUND 5/31/2025 PEAK HOURS NONE
NONE 0 NONE COUNT PERIODS

AM NOON PM
PM
AM
AM
NOON
PM
PM
NOON
AM
AM
NOON
PM

NOON PMNOON AMAMNOON PM PMNOON AMAMNOON PM
0 0
0 0
1 0 0 20 0 40
0 0
0 0
2 0 0 10 0 00
0 0
0 0
0 0
000
000
0 4
0 0
14 0
000
000
0 0
0 0
0 0
000
000
0 0
0 0
0 0
000
000
22 583
5 14
534
11 12
020
518
0 0
0 0
0 0
000
000

Page 241 of 1051 ends

Prepared by National Data & Surveying Services
ID: 25-080213-006 Day:

City: St Helena Date:

AM 1 0 0 0 AM
NOON 0 0 0 0 NOON
PM 0 0 1 0 PM

AM NOON PM PM NOON AM
0 0 0 0 0 0 0 0
1 642 0 492
0 0 0 0 0 27 0 54
0 0 0 0 TEV 1290 0 1228 0 0 0 0
588 0 492 1 PHF 0.96 0.88
79 0 16 0
0 0 1 0

AM NOON PM PM NOON AM
PM 0 28 0 22 PM
NOON 0 0 0 0 NOON
AM 0 33 0 43 AM
Pedestrians (Crosswalks)
Cars (PM) HT (PM)
0 133

NORTHBOUND
Elmhurst Ave
Cars (NOON) HT (NOON)
NONE
515 0 631
Cars (AM) 43 HT (AM) St Helena Hwy/SR 128/Main St/SR 29 EASTBOUNDWESTBOUND St Helena Hwy/SR 128/Main St/SR 29 526 0 670

CONTROL
1-Way Stop(NB)
0 NONE
04:15 PM - 05:15 PM 0
Elmhurst Ave & St Helena Hwy/SR 128/Main St/SR 29
Peak Hour Turning Movement Count
Elmhurst Ave Tuesday
SOUTHBOUND 5/27/2025 PEAK HOURS 4:00 PM - 06:00 PM
07:45 AM - 08:45 AM 0 7:00 AM - 09:00 AM COUNT PERIODS

AM NOON PM
PM
AM
AM
NOON
PM
PM
NOON
AM
AM
NOON
PM

NOON PMNOON AMAMNOON PM PMNOON AMAMNOON PM
0 0
0 0
0 0
50 350 2
1 0
1 0
0 3
00 000 0
0 16
1 1
11 0
000
100
0 0
0 0
0 0
000
000
0 56
1 5
42 0
000
103
0 626
15 26
481
0 001 27
022
0 0
0 0
0 0
000
000
0 436
78 49
546
0 100 32
040

Page 242 of 1051 ends

Prepared by National Data & Surveying Services
ID: 25-080213-006 Day:

City: St Helena Date:

AM 0 0 0 0 AM
NOON 0 0 0 0 NOON
PM 0 0 0 0 PM

AM NOON PM PM NOON AM
0 0 0 0 0 0 0 0
1 0 585 0
0 0 0 0 0 0 20 0
0 0 0 0 TEV 0 1241 0 0 0 0 0
0 557 0 1 PHF 0.99
0 23 0 0
0 0 1 0

AM NOON PM PM NOON AM
PM 0 0 0 0 PM
NOON 0 31 0 25 NOON
AM 0 0 0 0 AM
Pedestrians (Crosswalks)
Cars (PM) HT (PM)
43 0

NORTHBOUND
Elmhurst Ave
Cars (NOON) HT (NOON)
12:00 PM - 01:00 PM
0 582 0
Cars (AM) 0 HT (AM) St Helena Hwy/SR 128/Main St/SR 29 EASTBOUNDWESTBOUND St Helena Hwy/SR 128/Main St/SR 29 0 616 0

CONTROL
1-Way Stop(NB)
0 12:00 PM - 02:00 PM
NONE 0
Elmhurst Ave & St Helena Hwy/SR 128/Main St/SR 29
Peak Hour Turning Movement Count
Elmhurst Ave Saturday
SOUTHBOUND 5/31/2025 PEAK HOURS NONE
NONE 0 NONE COUNT PERIODS

AM NOON PM
PM
AM
AM
NOON
PM
PM
NOON
AM
AM
NOON
PM

NOON PMNOON AMAMNOON PM PMNOON AMAMNOON PM
0 0
0 0
0 0 0 50 0 40
0 0
0 0
1 0 0 00 0 00
0 0
0 0
0 0
000
000
0 4
0 1
14 0
000
002
0 0
0 0
0 0
000
000
0 0
0 0
0 0
000
000
0 581
23 19
543
0 000 31
023
0 0
0 0
0 0
000
000

Page 243 of 1051 ends

www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
4 3
3 1
13 3
5 2
34 2 1 3 6 7 5 4 22
7 5
Peak Hour 8 3 47 37 95 0 0
Count Total 10 5 85 70 170 0 0 2 1 3 9 13
8:45 AM 1 0 10 9 20 0 0 0 0 0 1 0 0 1
1 1 0 4 0 1
2 8:30 AM 1 1 10 13 25 0 0 0
1 0 1 0 1 0
5 1
8:15 AM 4 0 14 10 28 0 0
0 0 0 0 5 2
0 0 0
8:00 AM 2 1 12 9 24 0
0 0 1 0 1 1
1 0 0
0 7:30 AM 0 0 10 6 16 0 0 0
0 0 0 0 3 0
8 15 0
EB WB NB SB Total East
7:45 AM 1 1 11 5 18
0 0 2
HV% - 2% 0% 19% - - 26% 9%
2 0
7:15 AM 1 1 12 10 24 0 0
0 0 0 0 0 2
West North South
7:00 AM 0 1 6
0 31 0 11 47 62 0 34 433 9 0 70 459
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
0% 4% 2% 0% - 0% 7% 6% 7%
Peak
Hour
All 0 86 34
101 0 63 798 21 0
2 1 0 9 38 0 0 0 31 6 95 0
103 1,379 0
HV 0 2 0 6 0
Count Total 0 131 48 46 0 15 53 119 875 149 2,419 0
0 0 3 15 0 8 94 5 0 19 106 19 296 1,364
15 117 11 332 1,379
8:45 AM 0 14 7 6
18 0 8 117 2 0
408 1,305
8:30 AM 0 28 4 6 0 2 4
0 3 27 18 0 7 111 2 0 22 117 39
17 109 29 328 1,147
8:15 AM 0 32 18 12
14 0 11 104 1 0
311 1,055
8:00 AM 0 16 8 8 0 1 10
0 5 6 12 0 8 101 4 0 16 116 24
8 102 11 258 0
7:45 AM 0 10 4 5
9 0 6 98 5 0
250 0
7:30 AM 0 11 2 3 0 1 2
0 1 1 8 0 8 94 1 0 10 104 8
12 104 8 236 0
7:15 AM 0 10 3 2
7:00 AM 0 10 2 4 0 2 0 7 0 7 79 1 0

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Madrona Ave Fulton Ln Main St Main St
15-min
Total

UT LT TH RT
Date: 04/18/2024
Peak Hour Count Period: 7:00 AM 9:00 AM
SB 5.9% 0.89
TOTAL 6.9% 0.84
TH RT
WB 2.5% 0.63
NB 9.9% 0.94
Peak Hour: 7:45 AM 8:45 AM
HV %: PHF
EB 5.3% 0.61
0 0
0 0
10 02
0 0
0 0
5 4
7 6
N
Main St
Fulton Ln
Fulton Ln
Main St
Madrona Ave
Main St
TEV: 1,379
PHF: 0.84
103
459
70 632
581
0 62
47 11
120
113
0 9
433
34 501
476
0 31
34 86
151
184
0 Project Manager: (415) 310-6469 [email protected]

Page 244 of 1051 ends

www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0
0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0 0
0 0 0
0 0
0 0 0
0 0 0
0 LT TH
0 2 0 0 1 0 3
0 2 0 0 3 0
1 0
0 0
Peak Hour
Count Total 0 1
0 0 0 0 0 0 0 0 0 2
1 3
8:45 AM
0 0 0 0
2 8:30 AM
0 1 0 0 0 0 1
0 1
8:15 AM
0 0 0
0 0 0
0 0 0
0 0 0
1 8:00 AM
0 1 0 1
0 0
7:45 AM
0 0 0 0
0 7:30 AM
7:15 AM 0 0 0 0 0 0 0 0
0 0
0 0 0
7:00 AM 0 0
RT
95 0
Interval
Start
Madrona Ave Fulton Ln Main St Main St
15-min
Total
Rolling
One Hour
0 0 2 1 0 9 38 0 0 0 31 6

LT TH RT RT LT TH RT
0 62 8 170 0
Peak Hour 0 2 0 6
Count Total 0 4 0 6 0 1 3 1 0 13 70 2 0
0 0 0 0 0 1 8 1 0 0 8 1 20 97
0 11 2 25 95
8:45 AM 0 1 0 0
1 0 1 9 0 0
28 86
8:30 AM 0 0 0 1 0 0 0
0 0 0 0 0 2 12 0 0 0 8 2
0 7 2 24 82
8:15 AM 0 1 0 3
0 0 3 9 0 0
18 73
8:00 AM 0 0 0 2 0 0 1
0 0 1 0 0 3 8 0 0 0 5 0
0 6 0 16 0
7:45 AM 0 1 0 0
0 0 0 9 1 0
24 0
7:30 AM 0 0 0 0 0 0 0
0 0 1 0 0 1 11 0 0 0 9 1
0 8 0 15 0
7:15 AM 0 1 0 0
0 0 2 4 0 0
TH RT
7:00 AM 0 0 0 0 0 1 0

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Madrona Ave Fulton Ln Main St Main St
15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected]

Page 245 of 1051 ends

www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
7 1
8 3
1 2
4 7
33 0 0 1 1 7 1 5 14
2 8
Peak Hour 4 6 11 13 34 0 1
Count Total 6 8 18 28 60 0 2 2 1 5 9 14
5:45 PM 0 0 0 0 0 0 0 1 0 1 3 3 0 1
0 0 2 1 0 1
0 5:30 PM 1 0 3 6 10 0 0 0
0 0 0 0 1 1
0 0
5:15 PM 3 0 3 3 9 0 0
0 0 0 0 1 0
0 0 3
5:00 PM 1 3 1 2 7 0
0 0 0 0 0 0
6 0 2
0 4:30 PM 0 1 6 2 9 0 1 0
1 0 2 1 0 0
4 6 0
EB WB NB SB Total East
4:45 PM 0 2 1 6 9
0 1 0
HV% - 2% 0% 8% - - 0% 2%
1 1
4:15 PM 0 2 3 5 10 0 1
0 0 1 1 2 3
West North South
4:00 PM 1 0 1
1 24 0 7 27 165 0 16 495 5 0 40 477
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
14% 0% 3% 0% - 3% 2% 3% 2%
Peak
Hour
All 0 83 34
291 0 36 947 14 0
0 5 0 0 11 0 0 1 11 1 34 0
37 1,410 0
HV 0 2 0 2 0
Count Total 0 167 52 48 0 15 55 99 887 72 2,683 0
0 1 7 24 0 7 92 1 0 14 99 2 269 1,302
8 97 5 286 1,359
5:45 PM 0 16 3 3
34 0 3 104 3 0
370 1,410
5:30 PM 0 13 5 6 0 3 5
0 2 7 48 0 2 124 1 0 9 132 10
11 141 6 377 1,378
5:15 PM 0 21 9 5
41 0 3 121 3 0
326 1,381
5:00 PM 0 27 6 6 0 3 9
0 2 8 33 0 8 126 0 0 12 102 6
8 102 15 337 0
4:45 PM 0 12 9 8
43 0 3 124 1 0
338 0
4:30 PM 0 23 10 5 0 0 3
0 2 9 25 0 5 124 4 0 11 109 14
26 105 14 380 0
4:15 PM 0 24 5 6
4:00 PM 0 31 5 9 0 2 7 43 0 5 132 1 0

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Madrona Ave Fulton Ln Main St Main St
15-min
Total

UT LT TH RT
Date: 04/18/2024
Peak Hour Count Period: 4:00 PM 6:00 PM
SB 2.3% 0.88
TOTAL 2.4% 0.94
TH RT
WB 3.0% 0.87
NB 2.1% 0.96
Peak Hour: 4:30 PM 5:30 PM
HV %: PHF
EB 2.8% 0.90
0 0
0 0
00 00
0 0
1 0
1 5
7 1
N
Main St
Fulton Ln
Fulton Ln
Main St
Madrona Ave
Main St
TEV: 1,410
PHF: 0.94
37 477
40 554
743
0 165
27 7
199
79 0
5 495
16 508
516
0 24
34 83
141
80 0
Project Manager: (415) 310-6469 [email protected]

Page 246 of 1051 ends

www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0 0 1 0
0 0 0 0 1 1
0 0 0 0
0 0
0 0 0
0 LT TH
0 0 0 0 0 0 1 0
0 0 0
0 0
0 0 0
0 0 1
0 LT TH
0 0 0 0 0 0 1
0 2 0 0 5 0
0 0
0 0
Peak Hour
Count Total 0 1
0 0 0 0 0 1 0 0 1 1
0 0
5:45 PM
0 0 0 0
1 5:30 PM
0 0 0 0 0 0 0
0 3
5:15 PM
0 0 0
0 0 0
0 0 0
0 0 0
4 5:00 PM
0 0 0 0
1 0
4:45 PM
0 0 0 0
0 4:30 PM
4:15 PM 0 0 1 0 0 0 0 2
1 0
0 0 0
4:00 PM 1 0
RT
34 0
Interval
Start
Madrona Ave Fulton Ln Main St Main St
15-min
Total
Rolling
One Hour
0 1 0 5 0 0 11 0 0 1 11 1

LT TH RT RT LT TH RT
1 26 1 60 0
Peak Hour 0 2 0 2
Count Total 0 4 0 2 0 1 0 7 0 1 16 1 0
0 0 0 0 0 0 0 0 0 0 0 0 0 26
0 6 0 10 35
5:45 PM 0 0 0 0
0 0 0 3 0 0
9 34
5:30 PM 0 1 0 0 0 0 0
0 0 0 0 0 0 3 0 0 0 2 1
0 2 0 7 35
5:15 PM 0 2 0 1
3 0 0 1 0 0
9 34
5:00 PM 0 0 0 1 0 0 0
0 1 0 1 0 0 1 0 0 1 5 0
0 2 0 9 0
4:45 PM 0 0 0 0
1 0 0 6 0 0
10 0
4:30 PM 0 0 0 0 0 0 0
0 0 0 2 0 1 1 1 0 0 5 0
0 4 0 6 0
4:15 PM 0 0 0 0
0 0 0 1 0 0
TH RT
4:00 PM 0 1 0 0 0 0 0

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Madrona Ave Fulton Ln Main St Main St
15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected]

Page 247 of 1051 ends

www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
6 8
4 9
4 1
3 5
40 1 0 1 7 5 0 1 13
2 5
Peak Hour 0 1 2 9 12 0 0
Count Total 1 2 10 22 35 0 0 1 5 6 14 19
1:45 PM 0 0 0 2 2 0 0 1 0 1 5 0 0 0
0 0 0 3 0 0
1 1:30 PM 0 0 0 1 1 0 0 0
0 0 0 0 0 0
0 0
1:15 PM 0 1 1 2 4 0 0
0 0 0 0 2 2
0 0 4
1:00 PM 0 0 1 4 5 0
0 0 0 2 2 5
2 1 0
0 12:30 PM 0 0 1 2 3 0 0 0
0 0 0 0 7 1
6 14 0
EB WB NB SB Total East
12:45 PM 0 1 0 2 3
3 3 1
HV% - 0% 0% 0% - - 0% 0%
0 0
12:15 PM 0 0 0 3 3 0 0
0 0 0 0 1 5
West North South
12:00 PM 1 0 7
0 31 0 4 17 74 0 13 486 5 0 41 525
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
0% 0% 1% 0% - 2% 1% 2% 1%
Peak
Hour
All 0 73 15
151 0 33 965 13 0
0 1 0 0 2 0 0 1 7 1 12 0
48 1,332 0
HV 0 0 0 0 0
Count Total 0 143 33 60 0 11 26 70 1,024 95 2,624 0
0 1 1 16 0 3 120 2 0 6 108 18 312 1,332
10 140 12 329 1,327
1:45 PM 0 28 3 6
19 0 2 117 3 0
358 1,325
1:30 PM 0 14 4 4 0 0 4
0 1 5 23 0 4 123 0 0 14 144 8
11 133 10 333 1,287
1:15 PM 0 18 7 11
16 0 4 126 0 0
307 1,292
1:00 PM 0 13 1 10 0 2 7
0 2 1 19 0 5 117 3 0 4 126 10
4 126 16 327 0
12:45 PM 0 16 2 2
22 0 4 118 2 0
320 0
12:30 PM 0 19 6 7 0 0 3
0 4 2 19 0 4 115 1 0 15 119 8
6 128 13 338 0
12:15 PM 0 21 2 10
12:00 PM 0 14 8 10 0 1 3 17 0 7 129 2 0

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Madrona Ave Fulton Ln Main St Main St
15-min
Total

UT LT TH RT
Date: 04/20/2024
Peak Hour Count Period: 12:00 PM 2:00 PM
SB 1.5% 0.92
TOTAL 0.9% 0.93
TH RT
WB 1.1% 0.82
NB 0.4% 0.97
Peak Hour: 1:00 PM 2:00 PM
HV %: PHF
EB 0.0% 0.80
0 0
0 0
00 10
0 0
0 0
0 1
5 7
N
Main St
Fulton Ln
Fulton Ln
Main St
Madrona Ave
Main St
TEV: 1,332
PHF: 0.93
48 525
41 614
633
0 74
17 4
95 61
0 5
486
13 560
504
0 31
15 73
119
78 0
Project Manager: (415) 310-6469 [email protected]

Page 248 of 1051 ends

www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 1 2
0 2 0
0 0 0
0 0 0
0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0
0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0 0
0 0 0
0 0
0 0 0
0 0 0
0 LT TH
1 0 0 0 0 0 1
1 0 0 2 6 0
0 0
0 0
Peak Hour
Count Total 0 3
0 0 0 0 1 0 0 0 1 1
0 2
1:45 PM
0 0 0 0
5 1:30 PM
0 0 0 0 0 0 0
0 5
1:15 PM
0 0 0
0 0 0
0 0 0
0 0 0
5 1:00 PM
0 0 0 2
3 0
12:45 PM
0 0 0 0
0 12:30 PM
12:15 PM 0 0 0 0 0 0 0 0
0 0
0 0 0
12:00 PM 0 0
RT
12 0
Interval
Start
Madrona Ave Fulton Ln Main St Main St
15-min
Total
Rolling
One Hour
0 0 0 1 0 0 2 0 0 1 7 1

LT TH RT RT LT TH RT
1 19 2 35 0
Peak Hour 0 0 0 0
Count Total 0 0 0 1 0 0 0 2 0 0 9 1 0
0 0 0 0 0 0 0 0 0 0 2 0 2 12
0 1 0 1 13
1:45 PM 0 0 0 0
0 0 0 0 0 0
4 15
1:30 PM 0 0 0 0 0 0 0
0 0 0 1 0 0 1 0 0 0 2 0
1 2 1 5 14
1:15 PM 0 0 0 0
0 0 0 1 0 0
3 23
1:00 PM 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 2 0
0 1 1 3 0
12:45 PM 0 0 0 0
0 0 0 0 1 0
3 0
12:30 PM 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 3 0
0 6 0 14 0
12:15 PM 0 0 0 0
0 0 0 7 0 0
TH RT
12:00 PM 0 0 0 1 0 0 0

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Madrona Ave Fulton Ln Main St Main St
15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected]

Page 249 of 1051 ends

www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
3 1
1 1
5 3
1 0
15 0 0 0 0 3 6 1 10
8 2
Peak Hour 1 2 2 0 5 0 0
Count Total 2 3 2 0 7 0 0 0 0 0 2 3
8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0
1 8:30 AM 0 0 1 0 1 0 0 0
0 0 0 0 0 2
4 0
8:15 AM 0 0 1 0 1 0 0
0 0 0 0 0 1
1 0 0
8:00 AM 1 1 0 0 2 0
0 0 0 0 0 0
0 1 0
0 7:30 AM 1 0 0 0 1 0 0 0
0 0 0 0 0 1
0 1 0
EB WB NB SB Total East
7:45 AM 0 1 0 0 1
0 0 0
HV% - - 5% 0% - - 2% -
0 1
7:15 AM 0 0 0 0 0 0 0
0 0 0 0 2 0
West North South
7:00 AM 0 1 0
0 95 0 6 17 0 0 99 0 11 0 0 0
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
0% 12% - 0% - - - - 2%
Peak
Hour
All 0 0 20
0 0 136 0 16 0
2 0 0 2 0 0 0 0 0 0 5 0
0 248 0
HV 0 0 1 0 0
Count Total 0 0 38 154 0 9 26 0 0 0 379 0
0 3 0 0 0 17 0 2 0 0 0 0 53 248
0 0 0 48 248
8:45 AM 0 0 2 29
0 0 19 0 5 0
92 227
8:30 AM 0 0 3 18 0 1 2
0 1 4 0 0 42 0 2 0 0 0 0
0 0 0 55 161
8:15 AM 0 0 3 40
0 0 24 0 1 0
53 131
8:00 AM 0 0 6 18 0 2 4
0 2 7 0 0 14 0 3 0 0 0 0
0 0 0 27 0
7:45 AM 0 0 8 19
0 0 7 0 1 0
26 0
7:30 AM 0 0 10 6 0 0 3
0 0 3 0 0 7 0 2 0 0 0 0
0 0 0 25 0
7:15 AM 0 0 3 11
7:00 AM 0 0 3 13 0 0 3 0 0 6 0 0 0

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Fulton Ln Fulton Ln Railroad Ave Driveway
15-min
Total

UT LT TH RT
Date: 04/18/2024
Peak Hour Count Period: 7:00 AM 9:00 AM
SB - -
TOTAL 2.0% 0.67
TH RT
WB 8.7% 0.64
NB 1.8% 0.63
Peak Hour: 7:45 AM 8:45 AM
HV %: PHF
EB 0.9% 0.67
0 0
0 0
00 00
0 0
0 0
6 1
3 0
N
Railroad Ave
Fulton Ln
Fulton Ln
Railroad Ave
Fulton Ln
Driveway
TEV: 248
PHF: 0.67
0 0
0 0
0 0
0 17
6 23
31 0
11 0
99 101
110
0 95
20 0
115
116
0 Project Manager: (415) 310-6469 [email protected]

Page 250 of 1051 ends

www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0
0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0 0
0 0 0
0 0
0 0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0
0 0 0 0 0 0
0 0
0 0
Peak Hour
Count Total 0 0
0 0 0 0 0 0 0 0 0 0
0 0
8:45 AM
0 0 0 0
0 8:30 AM
0 0 0 0 0 0 0
0 0
8:15 AM
0 0 0
0 0 0
0 0 0
0 0 0
0 8:00 AM
0 0 0 0
0 0
7:45 AM
0 0 0 0
0 7:30 AM
7:15 AM 0 0 0 0 0 0 0 0
0 0
0 0 0
7:00 AM 0 0
RT
5 0
Interval
Start
Fulton Ln Fulton Ln Railroad Ave Driveway
15-min
Total
Rolling
One Hour
0 0 2 0 0 2 0 0 0 0 0 0

LT TH RT RT LT TH RT
0 0 0 7 0
Peak Hour 0 0 1 0
Count Total 0 0 2 0 0 0 3 0 0 2 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 4
0 0 0 1 5
8:45 AM 0 0 0 0
0 0 1 0 0 0
1 5
8:30 AM 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0
0 0 0 2 4
8:15 AM 0 0 0 0
0 0 0 0 0 0
1 3
8:00 AM 0 0 1 0 0 0 1
0 0 1 0 0 0 0 0 0 0 0 0
0 0 0 1 0
7:45 AM 0 0 0 0
0 0 0 0 0 0
0 0
7:30 AM 0 0 1 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0
7:15 AM 0 0 0 0
0 0 0 0 0 0
TH RT
7:00 AM 0 0 0 0 0 0 1

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Fulton Ln Fulton Ln Railroad Ave Driveway
15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected]

Page 251 of 1051 ends

www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
1 1
3 4
2 0
0 1
12 1 0 1 0 2 2 5 9
3 6
Peak Hour 1 2 4 0 7 0 0
Count Total 2 2 7 0 11 0 0 2 0 2 0 3
5:45 PM 0 0 0 0 0 0 0 0 0 0 0 1 0 0
0 0 0 0 0 0
0 5:30 PM 0 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0
5:15 PM 0 0 0 0 0 0 0
0 0 0 0 0 2
0 1 3
5:00 PM 0 1 2 0 3 0
0 0 0 0 0 0
0 1 2
0 4:30 PM 0 0 0 0 0 0 0 1
1 0 1 0 0 1
0 1 0
EB WB NB SB Total East
4:45 PM 1 1 2 0 4
0 1 0
HV% - - 7% 0% - - 2% -
0 1
4:15 PM 1 0 2 0 3 0 0
0 0 0 0 0 0
West North South
4:00 PM 0 0 1
1 63 0 11 24 0 0 174 0 10 0 0 0
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
9% 4% - 0% - - - - 2%
Peak
Hour
All 0 0 14
0 0 320 0 20 0
1 0 0 4 0 0 0 0 0 0 7 0
0 296 0
HV 0 0 1 0 0
Count Total 0 0 22 137 0 17 38 0 0 0 554 0
0 0 0 0 0 31 0 2 0 0 0 0 50 264
0 0 0 57 283
5:45 PM 0 0 0 17
0 0 35 0 2 0
83 296
5:30 PM 0 0 0 14 0 1 5
0 2 7 0 0 49 0 6 0 0 0 0
0 0 0 74 277
5:15 PM 0 0 2 17
0 0 45 0 0 0
69 290
5:00 PM 0 0 5 15 0 3 6
0 1 6 0 0 41 0 1 0 0 0 0
0 0 0 70 0
4:45 PM 0 0 3 17
0 0 39 0 3 0
64 0
4:30 PM 0 0 4 14 0 5 5
0 2 3 0 0 36 0 4 0 0 0 0
0 0 0 87 0
4:15 PM 0 0 4 15
4:00 PM 0 0 4 28 0 3 6 0 0 44 0 2 0

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Fulton Ln Fulton Ln Railroad Ave Driveway
15-min
Total

UT LT TH RT
Date: 04/18/2024
Peak Hour Count Period: 4:00 PM 6:00 PM
SB - -
TOTAL 2.4% 0.89
TH RT
WB 5.7% 0.88
NB 2.2% 0.84
Peak Hour: 4:30 PM 5:30 PM
HV %: PHF
EB 1.3% 0.96
0 0
0 0
00 10
0 0
0 0
2 5
2 0
N
Railroad Ave
Fulton Ln
Fulton Ln
Railroad Ave
Fulton Ln
Driveway
TEV: 296
PHF: 0.89
0 0
0 0
0 0
0 24
11 35
24 0
10 0
174
74 184
0 63
14 0
77 198
0 Project Manager: (415) 310-6469 [email protected]

Page 252 of 1051 ends

www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0
0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0 0
0 0 0
0 0
0 0 0
0 0 0
0 LT TH
1 0 0 0 0 0 1
2 0 0 0 2 0
0 0
0 0
Peak Hour
Count Total 0 0
0 0 0 0 0 0 0 0 0 0
0 0
5:45 PM
0 0 0 0
1 5:30 PM
0 0 0 0 0 0 0
0 2
5:15 PM
0 0 0
0 0 0
0 0 0
0 0 0
2 5:00 PM
0 0 0 0
1 0
4:45 PM
1 0 0 0
0 4:30 PM
4:15 PM 0 1 0 0 0 0 0 1
0 0
0 0 0
4:00 PM 0 0
RT
7 0
Interval
Start
Fulton Ln Fulton Ln Railroad Ave Driveway
15-min
Total
Rolling
One Hour
0 1 1 0 0 4 0 0 0 0 0 0

LT TH RT RT LT TH RT
0 0 0 11 0
Peak Hour 0 0 1 0
Count Total 0 0 2 0 0 1 1 0 0 7 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 3
0 0 0 0 7
5:45 PM 0 0 0 0
0 0 0 0 0 0
0 7
5:30 PM 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 3 10
5:15 PM 0 0 0 0
0 0 2 0 0 0
4 8
5:00 PM 0 0 0 0 0 1 0
0 0 1 0 0 2 0 0 0 0 0 0
0 0 0 0 0
4:45 PM 0 0 1 0
0 0 0 0 0 0
3 0
4:30 PM 0 0 0 0 0 0 0
0 0 0 0 0 2 0 0 0 0 0 0
0 0 0 1 0
4:15 PM 0 0 1 0
0 0 1 0 0 0
TH RT
4:00 PM 0 0 0 0 0 0 0

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Fulton Ln Fulton Ln Railroad Ave Driveway
15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected]

Page 253 of 1051 ends

www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
1 0
0 1
2 4
0 0
8 0 0 0 0 4 0 3 7
0 3
Peak Hour 2 1 1 0 4 0 0
Count Total 2 1 1 0 4 1 0 0 0 1 1 4
1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0
3 1:30 PM 0 0 0 0 0 0 0 0
0 0 0 0 1 0
0 0
1:15 PM 0 0 1 0 1 0 0
0 0 0 0 0 2
1 0 0
1:00 PM 1 0 0 0 1 0
0 0 0 0 0 0
0 0 0
0 12:30 PM 1 0 0 0 1 0 0 0
0 0 1 0 0 0
0 0 0
EB WB NB SB Total East
12:45 PM 0 1 0 0 1
0 0 0
HV% 0% - 14% 2% - - 1% -
0 0
12:15 PM 0 0 0 0 0 1 0
0 0 0 0 1 0
West North South
12:00 PM 0 0 0
1 48 0 6 8 0 0 91 0 4 0 0 0
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
17% 0% - 0% - - - - 2%
Peak
Hour
All 1 0 7
0 0 174 0 7 0
0 0 0 1 0 0 0 0 0 0 4 0
0 165 0
HV 0 0 1 1 0
Count Total 2 0 14 103 0 9 11 0 0 0 320 0
0 2 0 0 0 19 0 1 0 0 0 0 33 162
0 0 0 39 164
1:45 PM 0 0 2 9
0 0 20 0 1 0
52 165
1:30 PM 1 0 1 15 0 0 1
0 1 0 0 0 27 0 1 0 0 0 0
0 0 0 38 158
1:15 PM 0 0 1 22
0 0 22 0 1 0
35 158
1:00 PM 0 0 1 11 0 1 2
0 3 2 0 0 19 0 1 0 0 0 0
0 0 0 40 0
12:45 PM 1 0 2 7
0 0 23 0 1 0
45 0
12:30 PM 0 0 3 8 0 1 4
0 0 2 0 0 25 0 0 0 0 0 0
0 0 0 38 0
12:15 PM 0 0 3 15
12:00 PM 0 0 1 16 0 1 0 0 0 19 0 1 0

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Fulton Ln Fulton Ln Railroad Ave Driveway
15-min
Total

UT LT TH RT
Date: 04/20/2024
Peak Hour Count Period: 12:00 PM 2:00 PM
SB - -
TOTAL 2.4% 0.79
TH RT
WB 7.1% 0.70
NB 1.1% 0.85
Peak Hour: 12:30 PM 1:30 PM
HV %: PHF
EB 3.6% 0.61
0 0
0 0
00 00
0 0
0 0
0 3
4 0
N
Railroad Ave
Fulton Ln
Fulton Ln
Railroad Ave
Fulton Ln
Driveway
TEV: 165
PHF: 0.79
0 0
0 0
0 0
0 8
6 14
11 0
04 91
54 95
0 48
7 0
56 100
1 Project Manager: (415) 310-6469 [email protected]

Page 254 of 1051 ends

www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0 0 0 0
0 0 1 0 0 0
0 0 0 0
0 0
0 0 1
0 LT TH
0 0 0 0 0 0 0 0
0 0 0
0 0
0 0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0
0 0 0 0 1 0
0 0
0 0
Peak Hour
Count Total 0 0
0 0 0 0 0 0 0 0 0 0
0 0
1:45 PM
0 0 0 0
0 1:30 PM
0 0 0 0 0 0 0
0 1
1:15 PM
0 0 0
0 0 0
0 0 0
0 0 0
1 1:00 PM
0 0 0 0
0 0
12:45 PM
0 0 0 0
0 12:30 PM
12:15 PM 0 0 0 0 0 0 0 1
0 0
0 0 0
12:00 PM 0 0
RT
4 0
Interval
Start
Fulton Ln Fulton Ln Railroad Ave Driveway
15-min
Total
Rolling
One Hour
0 1 0 0 0 1 0 0 0 0 0 0

LT TH RT RT LT TH RT
0 0 0 4 0
Peak Hour 0 0 1 1
Count Total 0 0 1 1 0 1 0 0 0 1 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 2
0 0 0 0 3
1:45 PM 0 0 0 0
0 0 0 0 0 0
1 4
1:30 PM 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0
0 0 0 1 3
1:15 PM 0 0 0 0
0 0 0 0 0 0
1 2
1:00 PM 0 0 0 1 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0
12:45 PM 0 0 0 0
0 0 0 0 0 0
0 0
12:30 PM 0 0 1 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0
12:15 PM 0 0 0 0
0 0 0 0 0 0
TH RT
12:00 PM 0 0 0 0 0 0 0

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Fulton Ln Fulton Ln Railroad Ave Driveway
15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected]

Page 255 of 1051 ends

www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
7 8
1 11
9 23
10 12
81 0 1 2 5 18 19 12 54
19 21
Peak Hour 6 5 43 41 95 0 1
Count Total 7 6 83 68 164 0 1 0 1 2 8 33
8:45 AM 2 0 9 8 19 0 0 0 0 0 1 4 5 2
1 1 1 6 3 0
9 8:30 AM 2 1 12 10 25 0 0 0
0 0 1 2 4 8
3 1
8:15 AM 0 1 12 13 26 0 1
0 0 0 0 1 4
5 0 4
8:00 AM 2 3 10 10 25 0
0 0 0 0 0 2
1 0 0
1 7:30 AM 1 0 9 8 18 0 0 0
0 0 0 1 6 0
6 13 0
EB WB NB SB Total East
7:45 AM 0 0 12 4 16
0 0 0
HV% - 6% 0% 14% - - 5% 10%
0 4
7:15 AM 0 0 13 9 22 0 0
0 0 0 0 0 3
West North South
7:00 AM 0 1 6
4 21 0 26 39 29 0 37 410 39 0 31 423
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
15% 0% 3% 3% - 0% 10% 0% 8%
Peak
Hour
All 0 47 80
52 0 55 790 61 0
0 1 0 2 40 1 0 0 41 0 95 0
24 1,206 0
HV 0 3 0 3 0
Count Total 0 63 92 40 0 46 57 45 842 40 2,183 0
0 8 11 6 0 10 105 14 0 8 110 7 305 1,206
6 108 5 304 1,177
8:45 AM 0 6 16 4
6 0 6 102 8 0
315 1,116
8:30 AM 0 20 27 3 0 9 4
0 1 8 9 0 11 103 11 0 9 108 5
8 97 7 282 1,050
8:15 AM 0 13 30 7
8 0 10 100 6 0
276 977
8:00 AM 0 8 7 7 0 8 16
0 6 10 8 0 3 101 5 0 3 114 8
5 95 5 243 0
7:45 AM 0 5 6 7
5 0 6 96 3 0
249 0
7:30 AM 0 5 2 6 0 8 7
0 3 0 4 0 3 106 9 0 3 110 2
3 100 1 209 0
7:15 AM 0 2 3 4
7:00 AM 0 4 1 2 0 3 1 6 0 6 77 5 0

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Adams St Adams St Main St Main St
15-min
Total

UT LT TH RT
Date: 04/18/2024
Peak Hour Count Period: 7:00 AM 9:00 AM
SB 8.6% 0.96
TOTAL 7.9% 0.96
TH RT
WB 5.3% 0.73
NB 8.8% 0.94
Peak Hour: 8:00 AM 9:00 AM
HV %: PHF
EB 4.1% 0.74
0 0
0 1
00 00
0 0
1 0
19 12
18 5
N
Main St
Adams St
Adams St
Main St
Adams St Main St
TEV: 1,206
PHF: 0.96
24 423
31 478
486
0 29
39 26
94 150
0 39
410
37 470
486
0 21
80 47
148
100
0 Project Manager: (415) 310-6469 [email protected]

Page 256 of 1051 ends

www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0 0 1 0
0 0 0 0 1 0
0 0 0 0
0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0 0
0 0 0
0 0
0 0 0
0 0 0
0 LT TH
0 0 0 0 0 1 2
0 0 0 1 2 0
0 1
0 0
Peak Hour
Count Total 0 0
0 0 0 0 0 0 0 0 0 2
1 2
8:45 AM
0 0 0 0
1 8:30 AM
0 0 0 0 0 0 1
0 0
8:15 AM
0 0 0
0 0 0
0 0 0
0 1 0
0 8:00 AM
0 0 0 0
0 0
7:45 AM
0 0 0 0
0 7:30 AM
7:15 AM 0 0 0 0 0 0 0 0
0 0
0 0 0
7:00 AM 0 0
RT
95 0
Interval
Start
Adams St Adams St Main St Main St
15-min
Total
Rolling
One Hour
0 4 0 1 0 2 40 1 0 0 41 0

LT TH RT RT LT TH RT
2 66 0 164 0
Peak Hour 0 3 0 3
Count Total 0 3 1 3 0 5 0 1 0 2 80 1 0
0 0 0 0 0 1 8 0 0 0 8 0 19 95
0 10 0 25 92
8:45 AM 0 1 0 1
0 0 1 10 1 0
26 85
8:30 AM 0 1 0 1 0 1 0
0 0 0 1 0 0 12 0 0 0 13 0
0 10 0 25 81
8:15 AM 0 0 0 0
0 0 0 10 0 0
16 69
8:00 AM 0 1 0 1 0 3 0
0 0 0 0 0 0 12 0 0 0 4 0
1 7 0 18 0
7:45 AM 0 0 0 0
0 0 0 9 0 0
22 0
7:30 AM 0 0 1 0 0 0 0
0 0 0 0 0 0 13 0 0 1 8 0
0 6 0 13 0
7:15 AM 0 0 0 0
0 0 0 6 0 0
TH RT
7:00 AM 0 0 0 0 0 1 0

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Adams St Adams St Main St Main St
15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected]

Page 257 of 1051 ends

www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
53 28
42 25
32 43
25 43
291
0 0 0 26 39 17 60 142
30 120
Peak Hour 1 2 8 11 22 0 0
Count Total 1 2 17 30 50 0 0 0 0 0 50 91
5:45 PM 0 0 0 1 1 0 0 0 0 0 7 13 2 21
0 0 5 7 2 11
15 5:30 PM 0 0 3 5 8 0 0 0
0 0 0 12 12 4
1 21
5:15 PM 0 0 3 2 5 0 0
0 0 0 0 3 7
7 6 7
5:00 PM 1 1 0 4 6 0
0 0 0 0 0 5
13 6 17
8 4:30 PM 0 1 4 1 6 0 0 0
0 0 0 9 10 1
7 10 0
EB WB NB SB Total East
4:45 PM 0 0 1 4 5
0 0 6
HV% - 0% 2% 0% - - 0% 2%
8 20
4:15 PM 0 0 3 6 9 0 0
0 0 0 0 3 22
West North South
4:00 PM 0 0 3
0 18 0 55 53 38 0 23 403 34 0 56 435
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
0% 0% 5% 0% - 2% 2% 0% 2%
Peak
Hour
All 0 68 62
70 0 40 796 66 0
0 2 0 0 8 0 0 1 10 0 22 0
31 1,276 0
HV 0 0 1 0 0
Count Total 0 114 124 39 0 90 89 110 804 65 2,407 0
0 10 6 5 0 4 82 9 0 12 85 4 244 1,165
8 92 4 248 1,225
5:45 PM 0 10 11 6
5 0 7 88 12 0
335 1,276
5:30 PM 0 7 9 2 0 9 5
0 14 6 8 0 9 104 9 0 14 129 13
13 121 7 338 1,249
5:15 PM 0 16 7 6
13 0 4 95 7 0
304 1,242
5:00 PM 0 19 19 5 0 15 20
0 13 14 8 0 4 105 14 0 13 83 8
16 102 3 299 0
4:45 PM 0 15 21 6
9 0 6 99 4 0
308 0
4:30 PM 0 18 15 1 0 13 13
0 10 7 14 0 3 102 4 0 16 96 16
18 96 10 331 0
4:15 PM 0 17 18 5
4:00 PM 0 12 24 8 0 6 18 8 0 3 121 7 0

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Adams St Adams St Main St Main St
15-min
Total

UT LT TH RT
Date: 04/18/2024
Peak Hour Count Period: 4:00 PM 6:00 PM
SB 2.1% 0.84
TOTAL 1.7% 0.94
TH RT
WB 1.4% 0.76
NB 1.7% 0.93
Peak Hour: 4:30 PM 5:30 PM
HV %: PHF
EB 0.7% 0.86
0 0
0 0
00 00
0 0
0 0
17 60
39 26
N
Main St
Adams St
Adams St
Main St
Adams St Main St
TEV: 1,276
PHF: 0.94
31 435
56 522
509
0 38
53 55
146
152
0 34
403
23 508
460
0 18
62 68
148
107
0 Project Manager: (415) 310-6469 [email protected]

Page 258 of 1051 ends

www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0
0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0 0
0 0 0
0 0
0 0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0
0 0 0 0 0 0
0 0
0 0
Peak Hour
Count Total 0 0
0 0 0 0 0 0 0 0 0 0
0 0
5:45 PM
0 0 0 0
0 5:30 PM
0 0 0 0 0 0 0
0 0
5:15 PM
0 0 0
0 0 0
0 0 0
0 0 0
0 5:00 PM
0 0 0 0
0 0
4:45 PM
0 0 0 0
0 4:30 PM
4:15 PM 0 0 0 0 0 0 0 0
0 0
0 0 0
4:00 PM 0 0
RT
22 0
Interval
Start
Adams St Adams St Main St Main St
15-min
Total
Rolling
One Hour
0 0 0 2 0 0 8 0 0 1 10 0

LT TH RT RT LT TH RT
3 26 1 50 0
Peak Hour 0 0 1 0
Count Total 0 0 1 0 0 0 0 2 0 0 16 1 0
0 0 0 0 0 0 0 0 0 0 1 0 1 20
1 4 0 8 24
5:45 PM 0 0 0 0
0 0 0 3 0 0
5 22
5:30 PM 0 0 0 0 0 0 0
0 0 0 0 0 0 3 0 0 0 2 0
1 3 0 6 26
5:15 PM 0 0 0 0
1 0 0 0 0 0
5 30
5:00 PM 0 0 1 0 0 0 0
0 0 0 0 0 0 1 0 0 0 4 0
0 1 0 6 0
4:45 PM 0 0 0 0
1 0 0 4 0 0
9 0
4:30 PM 0 0 0 0 0 0 0
0 0 0 0 0 0 3 0 0 1 4 1
0 7 0 10 0
4:15 PM 0 0 0 0
0 0 0 2 1 0
TH RT
4:00 PM 0 0 0 0 0 0 0

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Adams St Adams St Main St Main St
15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected]

Page 259 of 1051 ends

www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
58 65
41 72
57 85
88 88
554
3 1 4 41 100 39 138 318
61 262
Peak Hour 2 3 4 9 18 0 0
Count Total 2 4 12 22 40 1 1 4 2 8 69 162
1:45 PM 1 0 1 1 3 0 0 1 0 1 9 35 15 29
0 0 14 21 12 41
41 1:30 PM 0 0 1 3 4 0 0 0
2 1 3 12 27 5
7 27
1:15 PM 0 1 1 2 4 0 0
0 0 0 0 6 17
12 6 46
1:00 PM 1 2 1 3 7 0
1 0 0 0 1 8
12 1 17
38 12:30 PM 0 0 2 1 3 0 0 0
1 0 2 3 18 6
4 10 0
EB WB NB SB Total East
12:45 PM 0 1 0 2 3
1 1 11
HV% - 0% 6% 0% - 0% 0% 1%
9 23
12:15 PM 0 0 0 6 6 0 1
0 0 0 0 6 20
West North South
12:00 PM 0 0 6
1 26 0 29 32 32 1 16 438 24 0 34 482
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
3% 6% 0% 0% - 0% 2% 0% 1%
Peak
Hour
All 0 38 33
55 1 28 892 55 0
2 0 0 0 4 0 0 0 9 0 18 0
26 1,211 0
HV 0 0 2 0 0
Count Total 0 78 73 49 0 52 55 61 959 53 2,411 0
0 8 7 12 0 9 105 8 0 9 115 4 311 1,211
6 106 5 285 1,196
1:45 PM 0 12 14 8
5 1 4 104 9 0
306 1,203
1:30 PM 0 13 6 6 0 11 9
0 6 12 8 0 2 108 5 0 8 125 10
11 136 7 309 1,204
1:15 PM 0 7 7 8
7 0 1 121 2 0
296 1,200
1:00 PM 0 6 6 4 0 4 4
0 7 3 7 0 1 116 8 0 7 110 8
5 124 4 292 0
12:45 PM 0 10 14 5
6 0 3 111 6 0
307 0
12:30 PM 0 7 8 5 0 8 5
0 6 7 5 0 5 111 6 0 8 127 5
7 116 10 305 0
12:15 PM 0 10 10 7
12:00 PM 0 13 8 6 0 2 8 5 0 3 116 11 0

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Adams St Adams St Main St Main St
15-min
Total

UT LT TH RT
Date: 04/20/2024
Peak Hour Count Period: 12:00 PM 2:00 PM
SB 1.7% 0.88
TOTAL 1.5% 0.97
TH RT
WB 3.2% 0.86
NB 0.8% 0.97
Peak Hour: 1:00 PM 2:00 PM
HV %: PHF
EB 2.1% 0.71
0 0
0 0
10 03
0 0
0 0
39 138
100
41 N
Main St
Adams St
Adams St
Main St
Adams St Main St
TEV: 1,211
PHF: 0.97
26 482
34 542
508
0 32
32 29
93 91
0 24
438
16 538
479
1 26
33 38
97 74
0 Project Manager: (415) 310-6469 [email protected]

Page 260 of 1051 ends

www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 1 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0 0 0 0
0 0 1 0 1 0
0 0 0 0
0 1
0 0 0
0 LT TH
0 0 0 0 0 0 0 0
0 0 0
0 0
0 0 0
0 1 0
0 LT TH
0 3 0 0 1 0 4
1 3 0 0 8 0
0 0
0 0
Peak Hour
Count Total 0 2
0 0 0 0 0 1 0 0 1 4
0 4
1:45 PM
0 0 0 0
5 1:30 PM
0 2 0 0 1 0 3
0 4
1:15 PM
0 0 0
0 0 0
0 0 0
0 0 0
4 1:00 PM
0 0 0 1
1 0
12:45 PM
0 0 0 0
0 12:30 PM
12:15 PM 0 1 0 0 0 0 0 2
0 0
0 0 0
12:00 PM 0 0
RT
18 0
Interval
Start
Adams St Adams St Main St Main St
15-min
Total
Rolling
One Hour
0 1 2 0 0 0 4 0 0 0 9 0

LT TH RT RT LT TH RT
0 22 0 40 0
Peak Hour 0 0 2 0
Count Total 0 0 2 0 0 1 3 0 0 0 12 0 0
0 0 0 0 0 0 1 0 0 0 1 0 3 18
0 3 0 4 18
1:45 PM 0 0 1 0
0 0 0 1 0 0
4 17
1:30 PM 0 0 0 0 0 0 0
0 0 1 0 0 0 1 0 0 0 2 0
0 3 0 7 19
1:15 PM 0 0 0 0
0 0 0 1 0 0
3 22
1:00 PM 0 0 1 0 0 1 1
0 0 1 0 0 0 0 0 0 0 2 0
0 1 0 3 0
12:45 PM 0 0 0 0
0 0 0 2 0 0
6 0
12:30 PM 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 6 0
0 4 0 10 0
12:15 PM 0 0 0 0
0 0 0 6 0 0
TH RT
12:00 PM 0 0 0 0 0 0 0

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Adams St Adams St Main St Main St
15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected]

Page 261 of 1051 ends

www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
2 4
0 5
10 6
2 10
39 1 1 3 9 4 7 8 28
11 12
Peak Hour 1 5 2 0 8 0 1
Count Total 3 7 3 0 13 0 1 3 1 5 11 5
8:45 AM 0 1 1 0 2 0 0 0 0 0 2 3 1 4
0 0 0 1 0 1
2 8:30 AM 1 1 0 0 2 0 0 0
1 0 2 2 0 2
4 1
8:15 AM 0 0 0 0 0 0 1
0 0 1 1 5 0
1 1 3
8:00 AM 0 3 1 0 4 0
0 0 0 0 0 0
0 0 0
1 7:30 AM 2 1 0 0 3 0 0 1
1 0 1 0 0 3
0 1 0
EB WB NB SB Total East
7:45 AM 0 1 0 0 1
0 1 0
HV% - 0% 0% 2% - - 2% 0%
0 0
7:15 AM 0 0 0 0 0 0 0
0 0 0 0 2 0
West North South
7:00 AM 0 0 1
0 58 0 6 32 26 0 65 99 28 0 46 57
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
0% 16% 0% 4% - 0% 0% 0% 2%
Peak
Hour
All 0 18 57
39 0 83 134 44 0
5 0 0 1 0 1 0 0 0 0 8 0
15 507 0
HV 0 0 0 1 0
Count Total 0 24 83 69 0 9 64 70 79 21 719 0
0 1 10 9 0 21 18 9 0 11 16 7 134 507
13 8 2 120 455
8:45 AM 0 5 15 12
7 0 10 20 9 0
154 378
8:30 AM 0 2 19 15 0 4 11
0 1 3 6 0 14 37 7 0 13 25 4
9 8 2 99 272
8:15 AM 0 8 15 21
4 0 20 24 3 0
82 212
8:00 AM 0 3 8 10 0 0 8
0 0 8 8 0 12 14 5 0 6 10 3
5 1 1 43 0
7:45 AM 0 3 7 6
0 0 2 8 4 0
48 0
7:30 AM 0 2 6 0 0 2 12
0 1 6 3 0 3 8 2 0 5 7 1
8 4 1 39 0
7:15 AM 0 1 7 4
7:00 AM 0 0 6 1 0 0 6 2 0 1 5 5 0

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Adams St Adams St Railroad Ave Railroad Ave
15-min
Total

UT LT TH RT
Date: 04/18/2024
Peak Hour Count Period: 7:00 AM 9:00 AM
SB 0.0% 0.70
TOTAL 1.6% 0.82
TH RT
WB 7.8% 0.73
NB 1.0% 0.83
Peak Hour: 8:00 AM 9:00 AM
HV %: PHF
EB 0.8% 0.76
0 0
0 0
01 00
1 0
1 0
7 8
4 9
N
Railroad Ave
Adams St
Adams St
Railroad Ave
Adams St
Railroad Ave
TEV: 507
PHF: 0.82
15 57
46 118
143
0 26
32 6
64 131
0 65
9928
121
192
0 58
57 18
133
112
0 Project Manager: (415) 310-6469 [email protected]

Page 262 of 1051 ends

www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0
0 0 0
1 0 0
0 0 0
0 0 0
0 0 0 0 1 0
0 0 0 0 1 0
0 0 0 0
0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0 0
0 0 0
0 0
0 0 0
0 0 0
0 LT TH
0 0 1 1 0 0 3
1 1 1 0 5 0
0 0
0 0
Peak Hour
Count Total 1 0
0 0 0 0 0 0 0 0 0 3
0 3
8:45 AM
0 0 0 0
4 8:30 AM
0 0 1 0 0 0 2
1 3
8:15 AM
0 0 0
0 0 0
0 0 0
0 1 0
2 8:00 AM
0 0 0 0
1 0
7:45 AM
1 0 0 0
0 7:30 AM
7:15 AM 0 0 1 0 0 0 0 1
0 0
0 0 0
7:00 AM 0 0
RT
8 0
Interval
Start
Adams St Adams St Railroad Ave Railroad Ave
15-min
Total
Rolling
One Hour
0 0 5 0 0 1 0 1 0 0 0 0

LT TH RT RT LT TH RT
0 0 0 13 0
Peak Hour 0 0 0 1
Count Total 0 0 2 1 0 0 7 0 0 1 0 2 0
0 0 1 0 0 0 0 1 0 0 0 0 2 8
0 0 0 2 7
8:45 AM 0 0 0 0
0 0 0 0 0 0
0 8
8:30 AM 0 0 0 1 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 4 8
8:15 AM 0 0 0 0
0 0 1 0 0 0
1 5
8:00 AM 0 0 0 0 0 0 3
0 0 1 0 0 0 0 0 0 0 0 0
0 0 0 3 0
7:45 AM 0 0 0 0
0 0 0 0 0 0
0 0
7:30 AM 0 0 2 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0
7:15 AM 0 0 0 0
0 0 0 0 1 0
TH RT
7:00 AM 0 0 0 0 0 0 0

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Adams St Adams St Railroad Ave Railroad Ave
15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected]

Page 263 of 1051 ends

www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
20 17
5 4
22 11
15 10
104
2 0 4 6 6 10 24 46
18 46
Peak Hour 3 2 1 1 7 0 2
Count Total 5 2 2 2 11 1 3 2 1 7 20 20
5:45 PM 0 0 0 0 0 0 0 0 0 0 3 4 0 3
0 1 6 4 3 2
5 5:30 PM 1 0 0 0 1 0 1 0
0 1 1 1 2 3
2 12
5:15 PM 0 0 0 0 0 0 0
0 0 0 1 4 4
1 0 3
5:00 PM 1 0 1 1 3 1
0 1 1 0 2 0
2 0 0
7 4:30 PM 0 1 0 1 2 0 0 1
0 0 0 3 1 6
0 2 0
EB WB NB SB Total East
4:45 PM 0 1 0 0 1
0 1 3
HV% - 0% 1% 4% - - 0% 1%
4 14
4:15 PM 1 0 1 0 2 0 0
1 0 0 1 0 2
West North South
4:00 PM 2 0 0
0 53 0 32 91 85 0 30 67 26 0 38 55
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
0% 1% 1% 0% - 3% 0% 0% 1%
Peak
Hour
All 0 19 93
184 0 59 123 43 0
1 1 0 0 1 0 0 1 0 0 7 0
19 608 0
HV 0 0 1 2 0
Count Total 0 31 155 111 0 49 158 70 109 34 1,126 0
0 1 13 19 0 1 14 3 0 9 10 5 107 518
7 15 4 116 564
5:45 PM 0 2 17 13
21 0 5 11 4 0
134 580
5:30 PM 0 4 12 14 0 5 14
0 4 18 33 0 4 17 5 0 7 12 3
9 17 3 161 601
5:15 PM 0 3 14 14
26 0 19 14 5 0
153 608
5:00 PM 0 3 19 17 0 7 22
0 10 22 15 0 7 22 6 0 11 12 4
5 11 6 132 0
4:45 PM 0 4 24 16
24 0 6 10 4 0
155 0
4:30 PM 0 4 22 6 0 7 27
0 8 19 20 0 8 20 5 0 10 16 5
12 16 4 168 0
4:15 PM 0 7 25 12
4:00 PM 0 4 22 19 0 7 23 26 0 9 15 11 0

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Adams St Adams St Railroad Ave Railroad Ave
15-min
Total

UT LT TH RT
Date: 04/18/2024
Peak Hour Count Period: 4:00 PM 6:00 PM
SB 0.9% 0.88
TOTAL 1.2% 0.90
TH RT
WB 1.0% 0.90
NB 0.8% 0.88
Peak Hour: 4:00 PM 5:00 PM
HV %: PHF
EB 1.8% 0.92
0 0
0 0
00 02
0 1
1 0
10 24
6 6
N
Railroad Ave
Adams St
Adams St
Railroad Ave
Adams St
Railroad Ave
TEV: 608
PHF: 0.9
19 55
38 112
171
0 85
91 32
208
157
0 30
6726
140
123
0 53
93 19
165
140
0 Project Manager: (415) 310-6469 [email protected]

Page 264 of 1051 ends

www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0
0 0 0
0 0 0
1 0 0
0 0 0
0 0 0 0 1 1
0 0 1 1 1 1
0 0 0 0
1 0
0 0 0
0 LT TH
0 1 0 0 0 0 0 0
0 0 0
0 0
0 0 0
0 0 0
0 LT TH
0 2 0 0 0 0 4
0 2 0 0 7 0
0 0
0 0
Peak Hour
Count Total 1 0
0 0 0 0 0 0 0 0 0 3
1 5
5:45 PM
0 0 0 0
5 5:30 PM
0 0 0 1 0 0 1
1 4
5:15 PM
0 0 0
0 0 0
0 0 0
0 0 0
4 5:00 PM
0 1 0 2
1 0
4:45 PM
0 1 0 0
0 4:30 PM
4:15 PM 0 0 0 0 0 0 0 0
0 0
0 1 0
4:00 PM 1 0
RT
7 0
Interval
Start
Adams St Adams St Railroad Ave Railroad Ave
15-min
Total
Rolling
One Hour
0 0 1 1 0 0 1 0 0 1 0 0

LT TH RT RT LT TH RT
1 0 1 11 0
Peak Hour 0 0 1 2
Count Total 0 1 2 2 0 0 1 1 0 0 2 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 4
0 0 0 1 5
5:45 PM 0 0 0 0
0 0 0 0 0 0
0 6
5:30 PM 0 0 1 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 3 8
5:15 PM 0 0 0 0
0 0 0 1 0 0
1 7
5:00 PM 0 1 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0
1 0 0 2 0
4:45 PM 0 0 0 0
0 0 0 0 0 0
2 0
4:30 PM 0 0 0 0 0 0 1
0 0 0 0 0 0 1 0 0 0 0 0
0 0 0 2 0
4:15 PM 0 0 1 0
0 0 0 0 0 0
TH RT
4:00 PM 0 0 0 2 0 0 0

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Adams St Adams St Railroad Ave Railroad Ave
15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected]

Page 265 of 1051 ends

www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
3 14
7 0
7 12
17 7
67 0 1 1 5 14 6 18 43
14 26
Peak Hour 1 1 1 1 4 0 0
Count Total 1 2 2 2 7 0 1 0 3 4 7 20
1:45 PM 1 0 0 0 1 0 0 0 0 0 0 4 0 3
0 0 1 3 4 9
3 1:30 PM 0 0 0 0 0 0 0 0
0 1 1 3 4 2
0 3
1:15 PM 0 1 1 0 2 0 0
0 0 0 0 1 3
0 0 0
1:00 PM 0 0 0 1 1 0
0 0 0 0 0 0
2 2 3
5 12:30 PM 0 0 0 0 0 0 0 0
0 1 2 1 3 5
0 0 0
EB WB NB SB Total East
12:45 PM 0 1 1 1 3
0 0 0
HV% - 0% 3% 0% - - 0% 2%
1 0
12:15 PM 0 0 0 0 0 0 1
0 0 1 1 1 1
West North South
12:00 PM 0 0 0
0 53 0 8 33 47 0 38 46 9 0 32 34
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
0% 3% 0% 0% - 0% 3% 0% 1%
Peak
Hour
All 0 7 33
91 0 55 84 18 0
1 0 0 0 1 0 0 0 1 0 4 0
6 346 0
HV 0 0 1 0 0
Count Total 0 14 83 90 0 16 79 66 53 12 661 0
0 3 10 11 0 11 12 1 0 6 6 2 92 346
7 11 3 86 334
1:45 PM 0 3 10 17
9 0 10 11 4 0
94 321
1:30 PM 0 3 9 9 0 2 8
0 2 11 16 0 10 10 2 0 12 9 1
7 8 0 74 309
1:15 PM 0 1 5 15
11 0 7 13 2 0
80 315
1:00 PM 0 0 9 12 0 1 4
0 4 11 7 0 2 12 4 0 4 6 3
6 5 0 73 0
12:45 PM 0 2 13 12
10 0 5 11 2 0
82 0
12:30 PM 0 1 9 8 0 3 13
0 1 14 12 0 4 10 0 0 10 6 2
14 2 1 80 0
12:15 PM 0 3 12 8
12:00 PM 0 1 16 9 0 0 8 15 0 6 5 3 0

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Adams St Adams St Railroad Ave Railroad Ave
15-min
Total

UT LT TH RT
Date: 04/20/2024
Peak Hour Count Period: 12:00 PM 2:00 PM
SB 1.4% 0.82
TOTAL 1.2% 0.92
TH RT
WB 1.1% 0.76
NB 1.1% 0.93
Peak Hour: 1:00 PM 2:00 PM
HV %: PHF
EB 1.1% 0.78
0 0
0 0
10 00
0 0
0 0
6 18
14 5
N
Railroad Ave
Adams St
Adams St
Railroad Ave
Adams St
Railroad Ave
TEV: 346
PHF: 0.92
6 34
32 72
100
0 47
33 8
88 74
0 9
38 46
95 93
0 53
33 7
93 77
0 Project Manager: (415) 310-6469 [email protected]

Page 266 of 1051 ends

www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0 0 0 0
0 0 0 0 1 0
0 0 0 0
0 0
0 0 0
0 LT TH
0 0 0 0 0 1 0 0
0 0 0
0 0
0 0 0
0 1 0
0 LT TH
0 0 0 0 1 0 1
0 0 0 0 4 0
0 0
0 0
Peak Hour
Count Total 2 1
0 0 0 0 0 0 0 0 0 1
0 1
1:45 PM
0 0 0 0
1 1:30 PM
0 0 0 0 1 0 1
0 2
1:15 PM
0 0 0
0 0 0
0 0 0
0 0 0
3 1:00 PM
0 0 0 0
0 0
12:45 PM
0 0 0 0
0 12:30 PM
12:15 PM 0 0 0 0 1 0 0 2
0 0
0 0 0
12:00 PM 1 0
RT
4 0
Interval
Start
Adams St Adams St Railroad Ave Railroad Ave
15-min
Total
Rolling
One Hour
0 0 1 0 0 0 1 0 0 0 1 0

LT TH RT RT LT TH RT
1 1 0 7 0
Peak Hour 0 0 1 0
Count Total 0 0 1 0 0 0 2 0 0 0 2 0 0
0 0 0 0 0 0 0 0 0 0 0 0 1 4
0 0 0 0 6
1:45 PM 0 0 1 0
0 0 0 0 0 0
2 6
1:30 PM 0 0 0 0 0 0 0
0 0 1 0 0 0 1 0 0 0 0 0
0 1 0 1 4
1:15 PM 0 0 0 0
0 0 0 0 0 0
3 3
1:00 PM 0 0 0 0 0 0 0
0 0 1 0 0 0 1 0 0 1 0 0
0 0 0 0 0
12:45 PM 0 0 0 0
0 0 0 0 0 0
0 0
12:30 PM 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0
12:15 PM 0 0 0 0
0 0 0 0 0 0
TH RT
12:00 PM 0 0 0 0 0 0 0

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Adams St Adams St Railroad Ave Railroad Ave
15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected]

Page 267 of 1051 ends

www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
4 5
1 1
4 6
0 6
27 0 0 2 4 2 6 4 16
9 10
Peak Hour 2 2 0 0 4 1 1
Count Total 5 3 0 0 8 1 1 0 0 2 6 2
8:45 AM 0 0 0 0 0 0 0 0 0 0 2 1 1 2
0 0 0 0 0 0
0 8:30 AM 1 0 0 0 1 0 0 0
0 0 1 2 0 4
1 2
8:15 AM 0 0 0 0 0 0 1
0 0 0 1 0 1
0 0 1
8:00 AM 1 2 0 0 3 1
0 0 0 0 0 0
0 0 1
1 7:30 AM 1 0 0 0 1 0 0 0
0 0 0 2 0 2
0 1 0
EB WB NB SB Total East
7:45 AM 0 1 0 0 1
0 0 0
HV% 50% 0% 2% 0% - - 0% -
1 3
7:15 AM 1 0 0 0 1 0 0
0 0 0 0 0 0
West North South
7:00 AM 1 0 0
0 26 0 0 19 1 0 6 0 2 0 0 1
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
- 11% 0% 0% - - 0% 0% 3%
Peak
Hour
All 2 16 45
1 0 9 0 2 0
2 0 0 0 0 0 0 0 0 0 4 0
3 121 0
HV 1 0 1 0 0
Count Total 2 21 74 33 0 0 34 0 1 5 182 0
0 0 3 0 0 1 0 1 0 0 0 1 28 121
0 0 0 40 111
8:45 AM 0 3 11 8
0 0 3 0 1 0
32 86
8:30 AM 1 5 13 7 0 0 10
0 0 2 1 0 1 0 0 0 0 0 2
0 1 0 21 67
8:15 AM 1 3 13 9
0 0 1 0 0 0
18 61
8:00 AM 0 5 8 2 0 0 4
0 0 4 0 0 0 0 0 0 0 0 0
0 0 0 15 0
7:45 AM 0 3 11 0
0 0 1 0 0 0
13 0
7:30 AM 0 1 7 0 0 0 6
0 0 4 0 0 2 0 0 0 0 0 1
0 0 1 15 0
7:15 AM 0 0 3 3
7:00 AM 0 1 8 4 0 0 1 0 0 0 0 0 0

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Adams St Adams St Driveway Library Ln
15-min
Total

UT LT TH RT
Date: 04/18/2024
Peak Hour Count Period: 7:00 AM 9:00 AM
SB 0.0% 0.50
TOTAL 3.3% 0.76
TH RT
WB 10.0% 0.50
NB 0.0% 0.50
Peak Hour: 8:00 AM 9:00 AM
HV %: PHF
EB 2.2% 0.86
0 1
0 0
00 00
0 0
1 0
6 4
2 4
N
Library Ln
Adams St
Adams St
Driveway
Adams St
Library Ln
TEV: 121
PHF: 0.76
3 1
0 4
17 0
1 19
0 20
47 0
6 02
27 8
0 26
45 16
89 30
2 Project Manager: (415) 310-6469 [email protected]

Page 268 of 1051 ends

www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 1 0 0 1 0
0 1 0 0 1 0
0 0 0 0
0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0 0
0 0 1
0 0
0 0 0
0 0 0
0 LT TH
0 0 0 0 0 0 2
0 0 0 0 2 0
0 0
0 0
Peak Hour
Count Total 0 0
0 0 0 0 0 0 0 0 0 2
0 2
8:45 AM
0 0 0 0
2 8:30 AM
0 0 0 0 0 0 1
1 1
8:15 AM
0 0 0
0 0 0
0 0 0
0 1 0
0 8:00 AM
0 0 0 0
0 0
7:45 AM
0 0 0 0
0 7:30 AM
7:15 AM 0 0 0 0 0 0 0 0
0 0
0 0 0
7:00 AM 0 0
RT
4 0
Interval
Start
Adams St Adams St Driveway Library Ln
15-min
Total
Rolling
One Hour
0 0 2 0 0 0 0 0 0 0 0 0

LT TH RT RT LT TH RT
0 0 0 8 0
Peak Hour 1 0 1 0
Count Total 1 0 4 0 0 0 3 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 4
0 0 0 1 5
8:45 AM 0 0 0 0
0 0 0 0 0 0
0 5
8:30 AM 1 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 3 6
8:15 AM 0 0 0 0
0 0 0 0 0 0
1 4
8:00 AM 0 0 1 0 0 0 2
0 0 1 0 0 0 0 0 0 0 0 0
0 0 0 1 0
7:45 AM 0 0 0 0
0 0 0 0 0 0
1 0
7:30 AM 0 0 1 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0
7:15 AM 0 0 1 0
0 0 0 0 0 0
TH RT
7:00 AM 0 0 1 0 0 0 0

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Adams St Adams St Driveway Library Ln
15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected]

Page 269 of 1051 ends

www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
2 7
2 2
5 2
2 3
25 0 0 1 4 0 4 5 13
6 9
Peak Hour 2 1 0 1 4 0 1
Count Total 3 1 0 1 5 0 1 0 0 1 8 2
5:45 PM 0 0 0 0 0 0 0 0 0 0 1 0 0 2
0 0 1 0 1 0
0 5:30 PM 1 0 0 0 1 0 0 0
0 0 0 1 1 0
1 2
5:15 PM 0 0 0 0 0 0 0
0 0 0 0 1 1
0 1 1
5:00 PM 0 0 0 0 0 0
0 1 0 0 1 0
0 1 0
4 4:30 PM 1 0 0 1 2 0 0 0
0 0 0 1 0 2
0 0 0
EB WB NB SB Total East
4:45 PM 0 1 0 0 1
0 0 1
HV% 0% 0% 9% 0% - - 0% -
0 0
4:15 PM 1 0 0 0 1 0 0
0 0 0 0 2 0
West North South
4:00 PM 0 0 0
0 15 0 0 46 1 0 23 0 0 0 0 1
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
- 2% 0% - - - 0% 4% 3%
Peak
Hour
All 10 17 23
1 0 38 0 0 0
1 0 0 0 0 0 0 0 0 1 4 0
24 160 0
HV 0 0 2 0 0
Count Total 20 33 35 16 0 0 81 0 1 48 273 0
0 0 5 0 0 2 0 0 0 0 0 7 23 113
0 0 4 28 126
5:45 PM 3 4 2 0
0 0 3 0 0 0
29 139
5:30 PM 3 2 5 1 0 0 10
0 0 9 0 0 3 0 0 0 0 0 9
0 0 4 33 151
5:15 PM 2 4 2 0
0 0 7 0 0 0
36 160
5:00 PM 2 6 3 0 0 0 11
0 0 13 0 0 8 0 0 0 0 0 1
0 0 7 41 0
4:45 PM 3 3 5 3
0 0 1 0 0 0
41 0
4:30 PM 2 7 2 2 0 0 20
0 0 5 1 0 6 0 0 0 0 0 10
0 1 6 42 0
4:15 PM 3 1 10 5
4:00 PM 2 6 6 5 0 0 8 0 0 8 0 0 0

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Adams St Adams St Driveway Library Ln
15-min
Total

UT LT TH RT
Date: 04/18/2024
Peak Hour Count Period: 4:00 PM 6:00 PM
SB 4.0% 0.63
TOTAL 2.5% 0.95
TH RT
WB 2.1% 0.59
NB 0.0% 0.72
Peak Hour: 4:00 PM 5:00 PM
HV %: PHF
EB 3.1% 0.86
0 0
0 0
00 00
0 0
1 0
4 5
0 4
N
Library Ln
Adams St
Adams St
Driveway
Adams St
Library Ln
TEV: 160
PHF: 0.95
24 1
0 25
18 0
1 46
0 47
23 0
00 23
16 23
0 15
23 17
65 103
10 Project Manager: (415) 310-6469 [email protected]

Page 270 of 1051 ends

www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0 0 1 0
0 0 0 0 1 0
0 0 0 0
0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0 0
0 0 0
0 0
0 0 0
0 0 0
0 LT TH
0 0 0 0 0 0 1
0 0 0 0 1 0
0 0
0 0
Peak Hour
Count Total 0 0
0 0 0 0 0 0 0 0 0 0
0 1
5:45 PM
0 0 0 0
1 5:30 PM
0 0 0 0 0 0 0
0 1
5:15 PM
0 0 0
0 0 0
0 0 0
0 0 0
1 5:00 PM
0 0 0 1
0 0
4:45 PM
0 0 0 0
0 4:30 PM
4:15 PM 0 0 0 0 0 0 0 0
0 0
0 1 0
4:00 PM 0 0
RT
4 0
Interval
Start
Adams St Adams St Driveway Library Ln
15-min
Total
Rolling
One Hour
0 0 1 0 0 0 0 0 0 0 0 1

LT TH RT RT LT TH RT
0 0 1 5 0
Peak Hour 0 0 2 0
Count Total 0 0 3 0 0 0 1 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 1
0 0 0 1 2
5:45 PM 0 0 0 0
0 0 0 0 0 0
0 3
5:30 PM 0 0 1 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 4
5:15 PM 0 0 0 0
0 0 0 0 0 0
1 4
5:00 PM 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0
0 0 1 2 0
4:45 PM 0 0 0 0
0 0 0 0 0 0
1 0
4:30 PM 0 0 1 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0
4:15 PM 0 0 1 0
0 0 0 0 0 0
TH RT
4:00 PM 0 0 0 0 0 0 0

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Adams St Adams St Driveway Library Ln
15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected]

Page 271 of 1051 ends

www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
2 5
3 2
8 1
0 5
26 0 0 2 4 0 1 6 11
6 11
Peak Hour 2 1 0 0 3 2 0
Count Total 2 1 0 0 3 2 0 0 0 2 7 2
1:45 PM 0 0 0 0 0 0 0 0 0 0 2 0 0 3
0 0 0 0 0 0
0 1:30 PM 0 0 0 0 0 0 0 0
0 0 2 0 0 1
0 4
1:15 PM 0 1 0 0 1 2 0
0 0 0 0 4 0
0 0 2
1:00 PM 1 0 0 0 1 0
0 0 0 0 0 0
0 0 2
0 12:30 PM 0 0 0 0 0 0 0 0
0 0 0 0 1 4
0 0 0
EB WB NB SB Total East
12:45 PM 1 0 0 0 1
0 0 1
HV% 25% 0% 14% 0% - - 0% -
1 0
12:15 PM 0 0 0 0 0 0 0
0 0 0 0 0 1
West North South
12:00 PM 0 0 0
0 1 0 0 8 0 0 3 0 0 0 0 0
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
- 13% - - - - - 0% 6%
Peak
Hour
All 4 15 7
0 0 3 0 0 0
1 0 0 0 0 0 0 0 0 0 3 0
11 49 0
HV 1 0 1 0 0
Count Total 13 26 11 4 0 0 14 0 0 22 93 0
0 0 2 0 0 0 0 0 0 0 0 3 11 47
0 0 3 17 49
1:45 PM 2 2 1 1
0 0 1 0 0 0
11 41
1:30 PM 0 4 4 0 0 0 5
0 0 1 0 0 1 0 0 0 0 0 3
0 0 1 8 41
1:15 PM 1 4 1 0
0 0 0 0 0 0
13 46
1:00 PM 1 4 1 1 0 0 0
0 0 2 0 0 1 0 0 0 0 0 4
0 0 3 9 0
12:45 PM 2 3 1 0
0 0 0 0 0 0
11 0
12:30 PM 1 1 1 1 0 0 2
0 0 1 0 0 0 0 0 0 0 0 3
0 0 2 13 0
12:15 PM 2 2 2 1
12:00 PM 4 6 0 0 0 0 1 0 0 0 0 0 0

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Adams St Adams St Driveway Library Ln
15-min
Total

UT LT TH RT
Date: 04/20/2024
Peak Hour Count Period: 12:00 PM 2:00 PM
SB 0.0% 0.69
TOTAL 6.1% 0.72
TH RT
WB 12.5% 0.40
NB 0.0% 0.75
Peak Hour: 12:45 PM 1:45 PM
HV %: PHF
EB 7.4% 0.84
2 0
0 0
00 00
0 0
0 0
1 6
0 4
N
Library Ln
Adams St
Adams St
Driveway
Adams St
Library Ln
TEV: 49
PHF: 0.72
11 0
0 11
15 0
0 8
0 8
7 0
3 00
1 3
0 1
7 15
27 26
4 Project Manager: (415) 310-6469 [email protected]

Page 272 of 1051 ends

www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 2 0 0 0
0 0 2 0 0 0
0 0 0 0
0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0 0
0 0 0
0 0
0 0 0
0 0 0
0 LT TH
0 0 0 0 0 0 2
0 0 0 0 2 0
0 0
0 0
Peak Hour
Count Total 0 0
0 0 0 0 0 0 0 0 0 2
0 2
1:45 PM
0 0 0 0
2 1:30 PM
0 0 0 0 0 0 2
0 0
1:15 PM
0 0 0
0 0 2
0 0 0
0 0 0
0 1:00 PM
0 0 0 0
0 0
12:45 PM
0 0 0 0
0 12:30 PM
12:15 PM 0 0 0 0 0 0 0 0
0 0
0 0 0
12:00 PM 0 0
RT
3 0
Interval
Start
Adams St Adams St Driveway Library Ln
15-min
Total
Rolling
One Hour
0 0 1 0 0 0 0 0 0 0 0 0

LT TH RT RT LT TH RT
0 0 0 3 0
Peak Hour 1 0 1 0
Count Total 1 0 1 0 0 0 1 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 2
0 0 0 0 3
1:45 PM 0 0 0 0
0 0 0 0 0 0
1 3
1:30 PM 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0
0 0 0 1 2
1:15 PM 0 0 0 0
0 0 0 0 0 0
1 1
1:00 PM 0 0 1 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0
12:45 PM 1 0 0 0
0 0 0 0 0 0
0 0
12:30 PM 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0
12:15 PM 0 0 0 0
0 0 0 0 0 0
TH RT
12:00 PM 0 0 0 0 0 0 0

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Adams St Adams St Driveway Library Ln
15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected]

Page 273 of 1051 ends

www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
10 10
6 17
23 13
28 17
124
0 0 0 17 42 0 22 81
2 33
Peak Hr 0 2 46 48 96 0 0
Count Total 0 5 84 74 163 0 0 0 0 0 29 60
8:45 AM 0 0 11 10 21 0 0 0 0 0 4 8 0 5
0 0 6 16 0 6
2 8:30 AM 0 1 10 13 24 0 0 0
0 0 0 2 9 0
0 9
8:15 AM 0 0 14 12 26 0 0
0 0 0 0 5 9
7 0 4
8:00 AM 0 1 11 13 25 0
0 0 0 0 0 6
5 0 0
4 7:30 AM 0 0 8 8 16 0 0 0
0 0 0 2 4 0
5 13 0
EB WB NB SB Total East
7:45 AM 0 2 10 5 17
0 0 1
HV% - - - - - - - 9%
2 3
7:15 AM 0 1 12 8 21 0 0
0 0 0 0 3 2
West North South
7:00 AM 0 0 8
2 0 0 21 0 16 0 0 470 66 0 26 432
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
10% - 0% 3% - 0% 11% - 9%
Peak
Hour
All 0 0 0
25 0 0 891 117 2
0 0 0 0 44 2 0 0 48 0 96 0
0 1,031 0
HV 0 0 0 0 0
Count Total 0 0 0 0 0 35 0 45 856 0 1,971 0
0 3 0 3 0 0 128 9 0 9 120 0 272 1,031
4 106 0 263 1,018
8:45 AM 0 0 0 0
4 0 0 116 25 0
257 987
8:30 AM 0 0 0 0 0 8 0
0 6 0 4 0 0 117 19 0 8 103 0
5 103 0 239 982
8:15 AM 0 0 0 0
5 0 0 109 13 0
259 940
8:00 AM 0 0 0 0 0 4 0
0 3 0 3 0 0 113 13 2 4 121 0
9 96 0 232 0
7:45 AM 0 0 0 0
3 0 0 109 13 0
252 0
7:30 AM 0 0 0 0 0 2 0
0 8 0 2 0 0 110 19 0 4 109 0
2 98 0 197 0
7:15 AM 0 0 0 0
7:00 AM 0 0 0 0 0 1 0 1 0 0 89 6 0
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
N/A Hunt Ave Main St Main St
15-min
Total

UT LT TH RT
SB 10.5% 0.89
TOTAL 9.3% 0.95

UT LT TH RT UT LT TH RT
WB 5.4% 0.77
NB 8.6% 0.95
Peak Hour: 8:00 AM 9:00 AM
HV %: PHF
EB - -
Date: 04/18/2024
N Peak Hour Count Period: 7:00 AM 9:00 AM
Main St
Hunt Ave
Hunt Ave
Main St
Main St
TEV: 1,031
PHF: 0.95
432
26 458
486
0 16
21 37
92 0
66 470
453
536
0 00 0
0 0
0 0
22 42
17 Project Manager: (415) 310-6469 [email protected]

Page 274 of 1051 ends
← All documents from this meeting