1 CITY  OF STOCKTON  – AMERICAN  RESCUE  PLAN
SAFE  CAMPING  AND  SAFE  PARKING  SITES  – PROJECT  PLAN On September 14, 2021, Council approved the City of Stockton’s American Rescue Plan Act (ARP) funding  distribution.  This  approval  included  $12.15  million  for  Homelessness/Housing,  under which  $1,800,000  was  approved  for  Safe  Camping  and  Safe  Parking  sites.  This  Project  Plan outlines the objectives and operational details for creating a Safe Camping and/or Safe Parking Program.

Category  Amount
Homelessness / Housing  $12,150,000
Activity #1  Safe Camping and Safe Parking sites  $1,800,000

BACKGROUND
San Joaquin County, Continuum of Care
and City of Stockton worked to create a strategic plan to address homelessness which was adopted by all three entities during the summer of 2020. The Pandemic  response  to  homelessness  was  guided  by  the  City  Council‐approved  San  Joaquin Community  Response  to  Homelessness  Strategic  Plan,  Public  Health,  St ate  mandates  and  the CDC. During the last Point in  Time Count in January of 2019, 921 unsheltered homeless  were identified in the City of Stockton.

Per  health  guidelines,  encampments  were  left  in  place  and  unsheltered  individuals  were  not moved  in  an  effort  to  stop  the  spread  of  COVID‐19.  This  has  had  lasting  effects  on  the  City infrastructure and community safety.

In addition, individuals experien
cing homeless are at a greater risk of COVID‐19 morbidity and mortality because they are less connected to health care and other support systems and more likely to have other health conditions. Unsheltered populations represent those most at risk of negative health consequences of COVID‐19. In addition, people living in encampments did not
have basic facilities such as hand‐washing stations, which was recommended to help reduce the transmission of COVID‐19.

Recognizing the continued impact of COVID on unsheltered homelessness, the City is pursuing Safe Camping and
Safe Parking sites. Staff met with or visited programs in several Cities to gain insight  and  conduct  research  to  inform  program  creation. Significant  challenges  were

ATTACHMENT A

2 identified as  barriers  to  success,  the  most notable,  the  availability  of  exits  to  a  sheltered environment.

Goals & Objectives
The goal is to provide Safe Camping and Safe Parking sites for the unsheltered population in the City of Stockton while providing wrap‐around services. This pilot project will endeavor to balance the expenditure of resources, maximize moving individuals into shelter and prioritize capturing data to inform future decisions about the program. It is important to note that given the feedback staff has received from municipalities about the challenges of providing Safe Ground, the City will stand up a pilot program, learn from and test the success before pursuing additional sites.  Provide safe and secure location for unsheltered homeless  Provide services that assist individuals to prepare for and locate shelter  HMIS compliant
Measurements of Success:
 Number of clients moved to a sheltered location
 Number of clients being case managed and provided services  Number of calls for service

EQUITY
When  Safe  Camping  and  Safe  Parking  sites  are  set  up  to  receive  clients,  outreach  will  be conducted.  The  selected  partner  will  work  with  service  providers  and  follow  appropriate Continuum of Care recommendations to ensure equitable access to the program.

OUTLINE
Site review
Staff reviewed more than 30 sites for compatibility with Safe Camping and Safe Parking. Sites included all City Surplus property and Caltrans available owned parcels. Government owned sites have  been prioritized over  privately  owned  sites  to enable  faster  implementation  and  reduce liability.

The top 10 sites identified by Public Works and Economic Development  were further reviewed by  CDD,  Fire  and  PD. The  site(s)  compatibility was reviewed  for  zoning,  location,  accessibility, ingress/egress,  utility  connections,  and  status  of  environmental  monitoring. Three  sites met

ATTACHMENT A

3 the minimum criteria needed to pursue further. Public Works will take the necessary next steps to further site selection and implementation.

In  addition,  given  the  limited  sites  that  meet  the  minimum  requirements,  the  Economic Development Department will review privately owned sites for possible acquisition.

Ideal site specifications:
 Minimum amount of space ‐ Suggest ion is 10,000 sq/ft which is around .23 acres  Vacant, flat, and paved to avoid drainage and livability issues  Free of toxic substances or be able to quickly mitigate any toxic substances  Sites should not have a current use on or adjacent to the site that would be in conflic t  Utilities to include:  water/transit/transportation/portable toilets/hand washing  Access to transit services
The following sites have been identified to proceed with the next steps:

SR 99/ Mariposa Park and Ride
Site  is owned  by  Caltrans and  would  be  conducive  to Safe Parking only. The site is fully paved and fenced in parking lot with high visibility. Not near social services.

Fire,  PD  and  PW  acceptable.  CDD: In  current  state  it is unacceptable.  Half  the  site  is  in  the  County  of  San Joaquin.  If  the  half  of  the  site  in  the City limits  is desired,  then  a  Commission  Use  Permit  wo
uld  be
required, otherwise an annexation application could be
required.

Next Steps: Caltrans has started their internal review process to identify tentative conditions for potentially leasing this site.  The review is estimated to be complete mid‐January, whic h will help determine next steps and possible County collaboration for this site.

ATTACHMENT A

4 SR 99/4 and Myrtle Street
Site owned by City of Stockton. Unpaved, partially fenced open lot with high visibility and a lack of utilities. Not near social services. Next to PDM Steel. PD and PW acceptable.

Fire  acceptable  with  pavement.  CDD:  Need  to  further evaluate. Emergency Shelters are permitted in Industrial, General (IG) zoning with a Site Plan Review approval.

Next steps: Public Works to review fo
r cost of utility and
pavement.

Stanislaus and Lafayette
City owned vacant land. Not paved or fenced but high visibility.

Next  to  multifamily  apartments.  Close  to  social  services.  State Surplus Land Notification sent May 13, 2021, and no developers came  forward.  PD  and  PW  Acceptable.  Fire  acceptable  with pavement and CDD: Acceptable with approval of a Commission Use Permit.

Next  Steps:  Public  Works  to  review  for  cost  of  utility  and pavement.  As  the  most  promising
site  Public  Works  will  also
pursue creating a preliminary site map.

Program and Services
Staff conducted research that included interviews with Cities in the Central Valley, Bay Area and the  Sacramento  Region.  Encampment  polices  from  Seattle,  Portland,  Honolulu  and  multiple other cities were also analyzed.  In addition, staff conducted site visits to locations in Sacramento.

Safe Camping and Safe Parking sites need to include 24‐hour security and staffing, pavement an d fencing, rules of conduct, service provider and ideally regular case management for individuals.

The  Service  Provider  will  be  responsible  for  providing  or  procuring  security  and  a  variety  of services. The site will be prepped with pavement and fencing.

Key program elements include:

ATTACHMENT A

5  Operate  24/7  with  three  to  four  staff  per  shift  (M‐F  they  have  case  managers;  this  is additional staffing)
 County Mental Health, 2 times per week but staff triage for the most needy  2 meals a day, lunch, and hot dinner (delivered in to‐go containers)  Client agreement ‐ no open flame, no violence or threats, guidance on belongings and an orient
ation
 HMIS compliant
 Quality fence around the entire space with one point of entry (multiple exits if needed)  For  car  camping,  the  vehicle  must  be  operational.  If  not,  exiting  people  that  are  not compliant is extremely difficult

Generators are allowed
 Case management service model
 Hand washing stations/Portable toilets/Refuse containers  Pet Area/Waste Bags/Storage

SCHEDULE
Below reflects a high‐level schedule, both past and future, of the development of Safe Camping and Safe Parking sites in the City.

Task  Responsible  Start
City Surplus Notification to City Council   EDD  May 2021 Council Study Session on Homelessness  EDD  June 28, 2021 Caltrans Meeting   EDD  Sept. 8, 2021
Council Authorized Funding  EDD  Sept. 14, 2021
Site Tours   PW/EDD  Oct. 15, 2121
Issue RFP for
Homeless System Support  EDD  Nov. 14, 2021
Contractor to Support Safe Camping begins  EDD  Jan.  2021 Identify Site  PW/EDD  Feb. 2021
Develop Detailed Budget for Site  PW  Jan. 2022
Issue RFP for Service Provider  EDD  April 2022

ATTACHMENT A

6 EXPENDITURE  PLAN
The total ARP funding available for Safe Camping and Parking sites is $1,800,000.

Public Works will prepare the site using existing contracts that may be in place for asphalt, utilities etc.  or  will  procure  the  necessary  services  to  prepare  the  site  per  emergency  procurement procedures.

Economic  Development  will  procure  a  partner  through  an  RFP  process,  the  partner  will  be responsible for security, case manage
ment, wrap‐around services, and staffing.