24 HoursStockton Consolidated Storm Drainage
Maintenance Assessment District 2005‐1
Public Hearing for Fiscal Year 2022‐2023 Assessments
Municipal Utilities Department
June 14, 2022
Agenda Item No. 16.3
Storm Drainage Assessment District 2005‐1
• City’s Storm Water Discharge Permit (Order No. R5‐
2016‐0040, NPDES Permit No. CAS0085324) requires
storm water pollution control devices in new
development.
• July 26, 2005: Consolidated Storm Drainage
Maintenance District 2005‐1 established to fund
device maintenance.
• Each year, Council adopts the following:
• Engineer’s Report.
• Maximum Allowable Assessment.
• Annual Budget/Actual Assessment.
• Maintenance and operation of stormwater quality
(treatment) improvements.
• Assessment provides funding for:
• Operation, maintenance and preparation of an annual
Engineer’s report & tax rolls; legal review; collection of assessments on San Joaquin County property taxes and
City administration.
Storm Drainage Assessment District 2005‐1
Maximum Allowable vs. Actual Assessments
• Original Engineer’s Report approved by landowner
ballot – allows for annual Cost of Living Adjustment.
• Approves annual maximum allowable but collect only
what is needed for anticipated operational costs.
• Allows for unanticipated emergencies –t o collect
only if necessary.
Stockton
Consolidated
Storm Drainage
District 2005‐1
Annual Assessment
• Varies by zone as a result of:
• Zone size.
• Dwelling Unit Equivalent Factor.
• Number of parcels within zone.
• Amount and type of improvements to be maintained.
• FY 2022‐2023 Maximum Allowable Adjustment: +5.2%
• Based on the greater of 3% or the annual San‐Francisco‐ Oakland‐San Jose Consumer Price Index.
• FY 2022‐2023 Actual assessments are to increase 7.12% but stay within the maximum allowable.
Fiscal Year 2022‐2023 Zone Budgets
Fiscal Year 2022‐2023 Zone Budgets
Little John Creek
Fiscal Year 2022‐2023 Zone Budgets
Recommended Actions
• Overrule all public hearing protests.
• Approve and adopt:
• Stockton Consolidated Storm Drainage
Maintenance Assessment District 2005‐1 Annual
Engineer’s Report.
• Maximum Allowable Assessment.
• Annual Budget/Actual Assessment for each Zone
of the District.
• Confirm and levy assessment for each Zone.