PROJECT NAME PROJECT
NUMBER DESCRIPTION LOCATION DELIVERY STATUS ESTIMATED
USEFULL LIFE
FUNDING
ALLOCATED
Local Street Resurfacing FY21‐22 SB1 WD22003 Includes projects to provide approximately 40 centerline miles of various types of resurfacing treatments
Various
Streets
Projects are in the final design /
advertise for construction bids
stage
5‐7 years 3,850,000 $
Sidewalk, Curb, Gutter, Curb Ramp Repairs FY21‐22 SB1 WD22004 Includes removal and replacement of City tree‐damaged curb, gutter, sidewalk, and construction of curb ramps
Various
Streets
Projects are in the
advertisement and contract
award stage
50 years 1,450,000 $
Residential Streetlight LED Replacement FY21‐22 SB1 WD22005 Replace approximately 3800 faulty LED streetlight fixtures with more efficient LED streetlight fixtures as needed
Various
Streets
Construction contract
scheduled for Council award 7‐10 years 347,000 $
Streetlight Pole Replacement FY21‐22 SB1 WD22006 Replace streetlight poles that are oxidized and replace streetlight foundations with damaged anchor bolts as needed
Various
Streets
Project is in the final design
stage 50 years 231,000 $
City Street Re‐striping FY21‐22 SB1 WD22009 Re ‐stripe worn traffic striping along arterial and collector streets Various Streets
Project is in the final design
stage 5‐7 years $ 306,000
$ 6,184,000
ROAD MAINTENANCE AND REPAIR ACCOUNT (RMRA) PROJECT LIST FOR FISCAL YEAR 2021‐22 TOTAL SB1 RMRA FUNDING ALLOCATED FOR FY 2021‐2022