Community Development Department
Engineering & Transportation Planning
(209) 937-8564
FY 2022-23 Proposed Fee Schedule
Account # Effective
Date
Description Current
Amount
Proposed
Amount
Revocable Permit
5520-000-445010-220-221-10-55-521008 8/21/2022 General Revocable Permit Fee $827.00 $864.00 5520-000-445010-220-221-10-55-521008 8/21/2022 Gated Access Fee $419.00 $438.00 Transportation Permit (overload, overweight, and escort) 5520-000-445010-220-221-10-55-521008 8/21/2022 Application Fee for One-Time Permit $16.00 No Change 5520-000-445010-220-221-10-55-521008 8/21/2022 Application Fee for Annual Permit $90.00 No Change 5520-000-445010-220-221-10-55-521008 8/21/2022 Hourly Fee (per hour or fraction thereof) $59.00 $62.00 5520-000-445010-220-221-10-55-521008 8/21/2022 Pass-through Fee Actual Cost No Change Encroachment (Excavation) Permits
5520-000-445010-220-221-10-55-521008 8/21/2022 General - Up to 50 lineal feet $523.00 $547.00 5520-000-445010-220-221-10-55-521008 8/21/2022 General - Beyond 50 lineal feet, per foot $2.00 5520-000-445010-220-221-10-55-521008 8/21/2022 Driveway - standard/bridge $523.00 $547.00 5520-000-445010-220-221-10-55-521008 8/21/2022 Driveway -Beyond 25 lineal feet, per foot $1.00 $1.00 5520-000-445010-220-221-10-55-521008 8/21/2022 Sidewalks - Up to 12 lineal feet $523.00 $547.00 5520-000-445010-220-221-10-55-521008 8/21/2022 Sidewalks - Beyond 12 lineal feet, per foot $1.00 $1.00 5520-000-445010-220-221-10-55-521008 8/21/2022 Curb, gutter and/or monolithic curb, gutter and sidewalk - Up to 25 lineal feet
$523.00 $547.00
5520-000-445010-220-221-10-55-521008 8/21/2022 Curb, gutter and/or monolithic curb, gutter and sidewalk - Beyond 25 lineal feet, per foot
$2.00 $2.00
5520-000-445010-220-221-10-55-521008 8/21/2022 Utilities, storm, sanitary and water lines and excavations - Up to 50 lineal feet
$523.00 $547.00
5520-000-445010-220-221-10-55-521008 8/21/2022 Utilities, storm, sanitary and water lines and excavations - Beyond 50 lineal feet, per foot
$3.00 $3.25
5520-000-445010-220-221-10-55-521008 8/21/2022 Traffic Handling/Lane Closure Only Fee - up to three (3) days
$523.00 $547.00
5520-000-445010-220-221-10-55-521008 8/21/2022 Additional Fee, per day $100.00 $104.00 5520-000-445010-220-221-10-55-521008 8/21/2022 Street Construction Inspection (% of construction)
3.5% No Change
5520-000-445010-220-221-10-55-521008 8/21/2022 Profiling properties adjacent to levees to establish safe location for pools
$310.00 $324.00
5520-000-445010-220-221-10-55-521008 8/21/2022 The cost of removal and rough grade preparations, including the removal of tree
roots or other obstructions
Actual Cost No Change
5520-000-445010-220-221-10-55-521008 8/21/2022 Materials Testing Fee - First $0 to $99,999 of construction cost
3% of est.
construction cost
No Change
5520-000-445010-220-221-10-55-521008 8/21/2022 Materials Testing Fee - Value of $100,000 - $749,999 of construction cost
0.5% of est.
construction cost
No Change
5520-000-445010-220-221-10-55-521008 8/21/2022 Materials Testing Fee - In excess of value of construction cost
0.25% of est.
construction cost
No Change
City of Stockton
F - 16
FY 2022-23 Proposed Fee Schedule
$2.00
EXHIBIT 1