EXHIBIT 2
June 7, 2022
Joshua Lewis, P.

E.

Associate Civil Engineer
City of Stockton
22 E. Weber Ave., Room 301
Stockton, CA 95202-2326
Re: Amendmen
t #4 – Design Support During Construction, for Women’s Restroom / Lockers Room and Toilet Rooms 4 & 18 for Police Headquarters, 22 E. Market Street, Stockton, CA, ref. # 013 1936478
Dear Josh,
This letter, r
evised per the request of Jesse Garcia, describes certain changes in service and is an amendment to the existing agreement with an effective date of November 21, 2016. All other terms and conditions of the original existing agreement remain in full force and effect. The following attachments are referenced.
• 2022 Fee Schedule, may be upda
ted from time to time.

Description o
f Scope of Services change:

This proposal prov
ides design support during construction services, additional to the formerly referenced Construction Administration CA services to supplement scope added under Amendment 3 which included final design and minimal Bidding and CA services. Amendment #4 adds fee to more closely align with the services provided on the Men’s Remodel project which was completed last year and also included added design scope performed during bidding. The design scope now provides new finishes and a new opening in existing CMU into the Property Vault 46.

Changes to A
greement:

Section 3., T
erm: Extend contract time from 3/31/22 to 3/31/23. The 3/31/22 term was approved under Amendment 3 by the First Extension of the Contract dated 4/25/19.

Section 4., Compensation: For the additional work described in this amendment, change total compensation amount from $681,693 as authorized in Amendment 3 to $758,947. The attached 2022 Fee Schedule will be used for billing time and expense (t&m).

Changes to Exhib
it A – Scope of Work:

The Exhibit A – Scope o
f Services, Schedule of Delivery, and Compensation, also indicated as EXHIBIT 1, is replaced in its entirety with the following, note that Design Support During Construction and Construction Administration are used interchangeably for this discussion.

EXHIBIT 2
The following describes the work required for the remodel of Women’s Restroom, Shower & Locker Rooms, Toilet Rooms 4 & 18, and abatement with new flooring in Storage 41 & Closet 43 shown on the approved Basement Floor Plan. Design has already been completed and the project has been successfully bid with the low bid at $325,000. Scope has been added in the Property Vault 46 which includes added finishes and new opening in existing CMU wall.

Several facto
rs have changed since Amendment 3 which contained limited construction administration services. Since the City has decided to bid the work to a new contractor instead of change ordering it with the existing contractor, a whole new bidding and construction sequence is planned, requiring a considerable amount of work for a very small area and small construction value. A new contractor will have to be selected in a public bid process, then mobilize, coordinate a whole new slate of subcontractors, prepare submittals, etc. Since the new contractor will be unfamiliar with the project, he/she can be expected to issue many RFIs compared to the existing contractor and subs who are already familiar with the site and its various existing conditions. Thus, the level of effort for the bidding and construction effort is significant as compared to project size. City staff will handle day-to-day affairs, minimizing the need for our services during construction.

The level
of effort for construction administration work is dependent on many factors, most of which are not entirely predictable, thus work will be completed on a T&M allowance basis. Indigo will perform all construction administration services requested by the City, and will endeavor to complete the assignment within the budget provided by this amendment. Work that requires more compensation than the cost included in this amendment is beyond the scope of this agreement, and if required would be the basis of a further amendment.

DESIGN SUPP
ORT DURING CONSTRUCTION (formerly referred to as Construction Administration) T&M allowance basis
A. Add services D
esign Support During Construction – T&M services on an allowance basis. a. Additional services to be provided as directed by City, and may include: answer bidder questions; attend meetings; review submittals; respond to requests for information RFI; conduct final inspection; review record documents submitted by contractor; from contractor record documents, prepare “Record Drawings” for submittal to City of Stockton for safekeeping (mylars not included); and other services as may be requested by City.

Fee Discussion
Amendmen
t 3 included a total fee of $62,000 for Final Design through permitting with an allowance of $25,100 for Bidding and Construction, including a $13,000 for hazmat monitoring, leaving only $12,000 allowance for A&E construction support. Indigo spent $5,121 as of 5/12/22 for Bidding services, leaving at that time only $6,879 remaining in contract for A&E design support during construction.

Even assuming mi
nimal design support during construction services, for this small, publicly bid, complicated remodel project located in the basement of a 1980’s vintage essential services building, explaining the need for an additional amendment to cover design support during construction services this fee was low, also considering the City will not be engaging a construction manager. This amendment will allow Indigo to provide design support during construction services as requested.

As with the pr
ior project, this scope assumes that the essential services building exemption found in the 2019 California Administrative Code, Article 4, section 4-207 will still be found to apply to this projected by the CBO: “Existing buildings housing essential services facilities owned or leased by the state, a city, a EXHIBIT 2
city and county or a county prior to the effective date of the (Essential Services Buildings Seismic Safety Act of 1986) Act are exempt from these regulations.”
Changes to Exh
ibit A – Compensation Schedule:

The prior a
uthorized fixed-fee amount of $681,693 is thereby increased by $77,254. by this amendment resulting in an adjusted total fee of $758,947 as follows and as indicated on the separate Project Fee Estimation dated 6/7/22:

Add service
Design Support During Construction (t&m a llowance basis) $77,254..

Total this amendment $77,254.

Contract summ
ary to-date:

Original con
tract - Basic services $599,800.

CCO#1 – Hazardous Materials Assessment Services: $6,893.

Amendment #3 – Women’s Restroom & Toilet Rooms 4 & 18, A&E $62,00 0.

Amendment #3 – Women’s Restroom & Toilet Rooms 4 & 18, Hazmat consultant $13,000.

Amendment #4 – Women’s Restroo m add’l Design Support During Construction $77,254.

Total Adjusted T&M NTE Fee $758,947.

Bruce Playl
e, Architect, AIA
Licensed Architect C 15459
INDIGO/ Hammond & Playle Architects, LLP
attachments
Joshua Lewis
City of Stockton
date signed:_______________________
Prior Fee
Amount
Change this
amendment
Adjusted
Fee
Basic Scope Fee
A. Preliminary Design (fixed-fee, excl. reimb. expense) $140,000 $0 $140,000 B. Final Design (fixed-fee, excl. reimb. expense) $364,100 $0 $364,100 C. Bidding & Construction (t&m allowance basis) $95,700 $0 $95,700 Basic Scope Fee $599,800 $0 $599,800
Changes
CCO#1 - Hazmat Assessment Services (fixed fee) $6,893 $0 $6,893 Amend. #3 - Add Women's Restrm/ Locker Rm & Toilet Rms 4 & 18, A&E (T&M NTE) $62,000 $0 $62,000 Amend. #3 - Add Women's Restrm/ Locker Rm & Toilet Rms 4 & 18, Hazmat (T&M NTE $13,000 $0 $13,000 Amend #4 - Add Services for design support during construction $0 $77,254 $77,254 Amendment Fee $81,893 $77,254 $159,147
Total Adjusted Fee $681,693 $77,254 $758,947
Scope of Services
EXHIBIT 2
2022 Fee Schedule
Indigo Hammond + Playle Architects, LLP
Principal Architect $265
Architect $220
Senior Designer $195
Designer/ Drafter- Level 2 $160
Designer/ Drafter- Level 1 $140
Clerical $115
Overtime rate 1.5 times hourly rates above.

Consultants and reimbursable expenses are at 1.15 x cost.

Mileage at $0.585 per mile.

Rates subject to change from time-to-time.

Indigo Hammond + Playle Archtiects, LLP
EXHIBIT 2
Project Fee Estimation
Architectural and Engineering Services, Womens Restroom / Lockers Room, Toilet Rooms 4 18, Police Headquarters, Stockton CA, INDIGO/ Hammond Playle Architects, LLP, June 7, 2022 Scope of Work, Tasks (note that nos. refer to specific tasks in scope of work narrative) Est. Hours Avg. Rate Cost Est. Hours Avg. Rate Cost Est. Hours Avg. Rate Cost Est. Hours Avg. Rate Cost Est. Hours Avg. Rate Cost Est. Hours Cost (hrs.) ($/hr.) ($) (hrs.) ($/hr.) ($) (hrs.) ($/hr.) ($) (hrs.) ($/hr.) ($) (hrs.) ($/hr.) ($) (hrs.) ($) DESIGN SUPPORT DURING CONSTRUCTION (T&M allowance basis) 1 Attend the Pre-Bid Meeting. 0 $180 $0 0 $180 $0 0 $180 $0 0 $180 $0 0 $180 $0 0 $0 2 Review and respond to Bidder questions. 0 $180 $0 0 $180 $0 0 $180 $0 0 $180 $0 0 $180 $0 0 $0 3 Prepare Addenda content for issuance by City. 0 $180 $0 0 $180 $0 0 $180 $0 0 $180 $0 0 $180 $0 0 $0 4 Assist City with its Bid Evaluation process. (NIC, by City) 0 $180 $0 0 $180 $0 0 $180 $0 0 $180 $0 0 $180 $0 0 $0 5 Attend Pre-Construction Meeting. 6 $180 $1,080 0 $180 $0 0 $180 $0 0 $180 $0 0 $180 $0 6 $1,080 6 Hazmat oversight (see FACS proposal letter for more detail...) 4 $180 $720 0 $180 $0 0 $180 $0 0 $180 $0 0 $180 $0 4 $720 7 Review and respond to Contractor submittals (includes up to 50). 75 $180 $13,500 0 $180 $0 0 $180 $0 8 $180 $1,440 4 $180 $720 87 $15,660 8 Review and respond to Contactor RFI's (includes up to 40). 60 $180 $10,800 0 $180 $0 4 $180 $720 8 $180 $1,440 4 $180 $720 76 $13,680 9 Review and respond to Contactor PCO’s (NIC, by City). 0 $180 $0 0 $180 $0 0 $180 $0 0 $180 $0 0 $180 $0 0 $0 10 Issue Architectural Supplemental Instructions ASI. 8 $180 $1,440 0 $180 $0 3 $180 $540 2 $180 $360 0 $180 $0 13 $2,340 11 Maintain Submittal, RFI, ASI and CCO logs (NIC, by City). 0 $180 $0 0 $180 $0 0 $180 $0 0 $180 $0 0 $180 $0 0 $0 12 Attend construction project progress meetings (includes up to 3 virtual and 3 in person). 24 $180 $4,320 0 $180 $0 0 $180 $0 0 $180 $0 0 $180 $0 24 $4,320 13 Conduct preliminary observation and issue Punch List. 8 $180 $1,440 0 $180 $0 8 $180 $1,440 8 $180 $1,440 8 $180 $1,440 32 $5,760 14 Assist in preparation of Notice of Substantial Completion. 0 $180 $0 0 $180 $0 0 $180 $0 0 $180 $0 0 $180 $0 0 $0 15 Declare project 100% complete. Issuance of Notice of Final Completion ((NIC, by City). 0 $180 $0 0 $180 $0 0 $180 $0 0 $180 $0 0 $180 $0 0 $0 16 Assist in final close-out procedures, review & stamp record documents submitted by contractor. 8 $180 $1,440 0 $180 $0 2 $180 $360 2 $180 $360 2 $180 $360 14 $2,520 17 Prepare record drawings from Contractor as-builts. 10 $180 $1,800 0 $180 $0 6 $180 $1,080 10 $180 $1,800 4 $180 $720 30 $5,400 18 Allowance for communications not included above. Relies on City Project Manager being onsite 8 $180 $1,440 0 $180 $0 2 $180 $360 2 $180 $360 2 $180 $360 14 $2,520 day-to-day affairs of construction.
(see FACS proposal letter) (see FACS proposal letter)
SUBTOTAL FROM ABOVE 211 $180 $37,980 0 - $13,600 25 $180 $4,500 40 $180 $7,200 24 $180 $4,320 300 $67,600 EXPENSES $3,038 $1,088 $225 $360 $216 $4,927
SUBTOTAL $41,018 $14,688 $4,725 $7,560 $4,536 $72,527
MARKUP @ 15% n/a $2,203 $709 $1,134 $680 $4,726
TOTAL FEE - DESIGN SUPPORT DURING CONSTRUCTION, T&M ALLOWANCE AMOUNT $41,018 $16,891 $5,434 $8,694 $5,216 $77,254

53.1% 21.9% 7.0% 11.3% 6.8% 100.0%
Mechanical Engineer
(INDIGO Architects) (FACS) (Point 2 Engineering) (M. Neils Engineering) (Peters Engineering) Architecture Hazmat Monitoring Electrical & Data/Tel/Comm Engineering TOTALSStructural Engineering

EXHIBIT A
EXHIBIT 2