Resolution No.
STOCKTON CITY COUNCIL
RESOLUTION APPROVING THE FILING OF NOTICE OF EXEMPTION NO. NOE13-22, APPROVING THE PROJECT PLANS AND SPECIFICATIONS, AND AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT OF $144,665 TO POWER ENGINEERING CONSTRUCTION CO. FOR THE RWCF DIGESTER GAS PIPELINE EXPANSION JOINTS REPLACEMENT (PROJECT NO. UW21013); AND AUTHORIZING TRANSFER OF FUNDS OF $98,000 FROM EXISTING CAPITAL PROJECTS UW21012 ($53,000) AND UW20014 ($45,000) TO THE RWCF DIGESTER GAS PIPELINE EXPANSION JOINTS REPLACEMENT (PROJECT NO. UW21013) On June 30, 2022, the City Clerk of the City of Stockton opened, examined, and publicly declared the sealed bids offered for the RWCF Digester Gas Pipeline Expansion Joints Replacement (Project No. UW21013); and Power Engineering Construction Co. is the apparent low bidder in the amount of $144,665; and The bid submitted by Power Engineering Construction Co. is regular and responsive in all aspects; and The project complies with the City’s General Plan, pursuant to California Government Code, section 65402, and is exempt from the requirements of the California Environmental Quality Act (CEQA) as specified under Article 19, Section 15302(c), Class 2, of the CEQA Guidelines; The project is in conformance with the Stockton General Plan based on Policy Land Use – 6.3; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF STOCKTON, AS FOLLOWS:
The filing of the Notice of Exemption No. NOE13-22 under CEQA for the RWCF Digester Gas Pipeline Expansion Joints Replacement (Project No. UW21013), a copy of which is attached as Exhibit 1 and incorporated by this reference.
The City Council approves the project Plans and Specifications for the RWCF Digester Gas Pipeline Expansion Joints Replacement (Project No. UW21013).
A $144,665 Construction Contract between the City of Stockton and Power Engineering Construction Co. of Alameda, CA, is awarded for the RWCF Digester Gas Pipeline Expansion Joints Replacement (Project No. UW21013), a copy of which is attached as Exhibit 2 and incorporated by this reference.
The City Manager is hereby authorized to transfer funds in the amount of $98,000 from existing capital projects UW21012 ($53,000) and UW20014 ($45,000) to the RWCF Digester Gas Pipeline Expansion Joints Replacement (Project No. UW21013).
This Resolution shall take effect upon its adoption.
The City Manager is authorized to take all necessary and appropriate steps to carry out the purpose and intent of this Resolution.
PASSED, APPROVED, and ADOPTED September 27, 2022 .
KEVIN J. LINCOLN II
Mayor of the City of Stockton
ATTEST:
ELIZA R. GARZA, CMC
City Clerk of the City of Stockton