San Joaquin Area
Flood Control Agency
Levee Construction and
Maintenance Assessment
(LCMA)
PRELIMINARY ENGINEER’S REPORT
San Joaquin Area Flood Control Agency
Date: March 16, 2023

ATTACHMENT E

San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March16, 2023

1808000 LCMA Preliminary Engineer's Report 2023 0316.docx

ii

Table of Contents

1. Introduction ................................................................................................................................................ 1 Background ..................................................................................................................................................... 1 Purpose of this Engineer’s Report .................................................................................................................. 6 Report Organization ........................................................................................................................................ 6

2. Authority and Process ................................................................................................................................. 8

3. Proposed Services ..................................................................................................................................... 10 Services Funded by the Proposed Assessment ............................................................................................. 10 Levee O&M Services ................................................................................................................................. 10 Levee Capital Services ............................................................................................................................... 10 Delta Front: ........................................................................................................................................... 10 North Stockton: ..................................................................................................................................... 11 Central Stockton: .................................................................................................................................. 11

4. Financing And Funding Plan ...................................................................................................................... 12 Annual Budget for Levee O&M Services ....................................................................................................... 12 Budget for Zone 9 Project Levee O&M ..................................................................................................... 12 Budget for LSJRP Levee O&M ................................................................................................................... 14 Financing Plan for Levee Capital Services ..................................................................................................... 16 Initial LSJRP Cost Estimate ........................................................................................................................ 16 Cost Sharing .............................................................................................................................................. 17 Smith Canal Gate ....................................................................................................................................... 19 LERRDs ...................................................................................................................................................... 19 Project Implementation Timing ................................................................................................................ 19 Assessment Timing.................................................................................................................................... 20 Bond Plan .................................................................................................................................................. 20 Cash Flow Analysis .................................................................................................................................... 20 Total Estimated LCMA Budget ...................................................................................................................... 20

5. Assessment Methodology ......................................................................................................................... 22

ATTACHMENT E

San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March16, 2023

1808000 LCMA Preliminary Engineer's Report 2023 0316.docx

iii
General Discussion ........................................................................................................................................ 22 Requirements of Proposition 218 ............................................................................................................. 22 Special Benefits vs. General Benefits ........................................................................................................ 22 Assessment Boundary ................................................................................................................................... 24 Hydraulic Analyses Performed to Support the Assessment Methodology ............................................... 24 Levee Breach Analysis for Levee O&M Services on Zone 9 Project levees ........................................... 24 Levee Breach Scenarios for Levee Capital Services on LSJRP and 100-year Accreditation Assurance . 25 Assessment District Boundary Diagram ................................................................................................ 27 Accounting for Uncertainty in the Breach Analysis Results .................................................................. 28 Assessment Apportionment Methodology ............................................................................................... 28 Property Characteristics ............................................................................................................................ 31 Land Use Categories .............................................................................................................................. 31 Parcel Size ............................................................................................................................................. 33 Average Structure Size per Land Use Type ........................................................................................... 34 Levee Capital and O&M Benefit Units .......................................................................................................... 34 Levee O&M Benefit Units ......................................................................................................................... 34 Minimum OBU within Zone 9 ............................................................................................................... 34 Relative Land Damage Rate per Acre .................................................................................................... 36 Structure Damage Rate ......................................................................................................................... 36 Levee Capital Benefit Units ....................................................................................................................... 36 Minimum flood depth ........................................................................................................................... 36 Relative Land Damage Rate per Acre .................................................................................................... 41 Structure Damage Rate ......................................................................................................................... 41 SCAAD Factor ............................................................................................................................................ 41 Equivalent Levee Benefit Unit (LBU) ......................................................................................................... 41 General Benefits............................................................................................................................................ 43 Thoroughfare Damages Calculation .......................................................................................................... 43 Federal Properties ..................................................................................................................................... 43 Evaluation of Funding Sources for General Benefit .................................................................................. 46 Proposed Special Benefit Assessment Calculation ....................................................................................... 46

ATTACHMENT E

San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March16, 2023

1808000 LCMA Preliminary Engineer's Report 2023 0316.docx

iv
Example Parcel Assessment ...................................................................................................................... 46 Summary of Assessments ......................................................................................................................... 48 Special Considerations .................................................................................................................................. 48 Public Parcels ............................................................................................................................................ 48 Multiple Use Parcels ................................................................................................................................. 48 Minimum Assessment Amount ................................................................................................................. 48 Application of the Assessment Boundary to Parcels ................................................................................ 50 Updating the Annual Assessment Roll ...................................................................................................... 50

6. Assessment Administration ...................................................................................................................... 51 Schedule for Collection ................................................................................................................................. 51 Assessment Revenue Distribution ................................................................................................................ 51 Appeals of Assessments Levied to Property ................................................................................................. 51 Impact of Appeals ..................................................................................................................................... 52 Duration of the Assessment .......................................................................................................................... 52 Annual Escalation of the Assessments .......................................................................................................... 52

7. Conclusions ............................................................................................................................................... 54 Example Assessment Calculations ............................................................................................................ 56

ATTACHMENT E
San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March16, 2023
1808000 LCMA Preliminary Engineer's Report 2023 0316.docx v List of Tables
Table 1 Levee O&M Services Budget for Zone 9 - FY 2023/24 ..................................................................... 13 Table 2 Levee Capital Services Incremental O&M Budget for LSJRP Features ............................................. 15 Table 3 Lower San Joaquin River Project Base Budget ................................................................................. 18 Table 4 Assessment District Budget - FY 2023/24 ........................................................................................ 21 Table 5 Representative Levee Lengths ......................................................................................................... 26 Table 6 Summary of Assessed Property Characteristics ............................................................................... 32 Table 7 Average Structure Size per Acre ...................................................................................................... 35 Table 8 Relative Land Damage Rate ............................................................................................................. 37 Table 9 Structure Replacement Value and Depth Damage .......................................................................... 38 Table 10 Contents Replacement Value and Depth Damage ....................................................................... 39 Table 11 Summary of Resulting Levee Benefit Units .................................................................................. 40 Table 12 Protected Throughfares ............................................................................................................... 44 Table 13 Thoroughfare General Benefit Calculation .................................................................................. 45 Table 14 Initial Proposed Assessment Rate Calculation – FY 2023/24 ....................................................... 47 Table 15 Summary of Proposed FY 2023/24 Assessments by Land Use Category ..................................... 49 Table 16 Assessment Parcel Equations and Example Calculations ............................................................. 55 List of Figures
Figure 1 Zone 9 Levees and Channels ........................................................................................................... 2 Figure 2 Lower San Joaquin River Project .................................................................................................... 4 Figure 3 FEMA Shaded Zone X “Protected by Levee" Area .......................................................................... 5 Figure 4 Combined USACE 100-year Floodplain and FEMA Shaded Zone X .............................................. 29 Figure 5 LCMA Assessment Boundaries and Benefiting Parcels ................................................................ 30 Figure 6 Smith Canal Area Assessment District Boundary ......................................................................... 42 Appendices
Appendix A:

Appendix B:

Appendix C:

Appendix D:

Appendix E:

Appendix F:

KSN, Technical Memorandum, LCMA, Incremental O&M Costs LSJRP, February 23, 2023 LCMA Cash Flow and Financing Analysis
R&F, Technical Memorandum, LCMA, Floodplain Analysis, March 16, 2023 Assessment District Boundary Diagram
San Joaquin County Use Codes & Assessment Land Use Categories List of Parcels & FY2023/24 Assessment Roll (Under Separate Cover)

ATTACHMENT E
San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March 16, 2023
1808000 LCMA Preliminary Engineer's Report 2023 0316.docx 1

1. INTRODUCTION
Background
The San Joaquin County Flood Control and Water Conservation District (SJCFCWCD) was formed in 1956 to plan, construct, operate, and maintain flood control, water supply, drainage, and groundwater recharge projects. On December 19, 1961, the San Joaquin County Board of Supervisors created Flood Control Zone No. 9 (Zone 9) to provide maintenance of existing channels, levees , and associat ed structures (Figure 1).

SJCFCWCD Zone 9 currently maintains 119 miles of Project Channels and 1 12 miles of Project Levees1 in accordance with agreements with the U.S. Army Corps of Engineers (USACE) and the California Department of Water Resources (DWR). Zone 9 also contains approximately 152 miles of non-project channels and 3 miles of Non-Project Levees maintained by SJCFCWCD as resources allow. Zone 9 is currently funded by a combination of property assessments and a small allocation of property taxes. The current property assessments inclu de the Zone 9 Flood Control Benefit Assessment established in 1988 and an assessment levied by the San Joaquin Area Flood Control Agency (SJAFCA) established in 1996.

SJAFCA is a Joint Powers Authority (JPA) formed in 1995 between the City of Stockton, San Joaquin County, and SJCFCWCD with the initial goal of restoring a 100 -year level of flood protection to the greater Stockton metropolitan area. In February 1995 the Federal Emergency Management Agency (FEMA) issued preliminary Flood Insurance Rate Maps (FIRMs) that placed a majority of the greater Stockton metropolitan area within a Special Flood Hazard Area (SFHA). To prevent the SFHA designation from becoming effective, the JPA parties recognized that a coordinated regional effort was needed. SJAFCA was formed to plan, design, and construct a suite of projects that became known collectively as the Flood Protection Restoration Project (FPRP). The FPRP consists of flood wall and levee improvements along 40 miles of existing levees, 12 miles of new levees, modifications to 24 bridges, and the construction of two major detention basins and pump station s. To fund construction and provide for the long-term operation and maintenance (O&M) of the FPRP, SJAFCA formed an Assessment District No. 96 -1 (AD 96 -1) in 1996. The completed FPRP is operated and maintained by SJCFCWCD on behalf of SJAFCA using funds generated by AD 96 -1. In November 2017, SJAFCA expanded to include the Cities of Lathrop and Manteca to address the requirements of Senate Bill 5.

After significant flood damage from hurricanes Katrina and Sandy, as well as other major storms , State and Federal policies were adjusted effectively creating more stringent levee maintenance requirements. The new requirements have increased necessary levee maintenance efforts resulting in increased O&M costs. The current funding sources described above have not been sufficient to provide for the increased maintenance efforts causing both SJAFCA and Zone 9 to rely on reserve funds to maintain Project Levees . In addition , support from SJAFCA is needed by SJCFCWCD to ensure that obligations associated with the FPRP are complied with and flood protection levels are maintained consistent with the increasingly stringent regulatory requirements.
1 Project levees are those facilities that are part of the State Plan of Flood Control as defined by the 2010 State Plan of Flood Control Descriptive Document, Central Valley Flood Management Planning Program, November 2010.

ATTACHMENT E
2 ATTACHMENT E
San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March 16, 2023
1808000 LCMA Preliminary Engineer's Report 2023 0316.docx 3 Additionally, in response to the aforementioned policy changes, in 2009, SJAFCA partnered with the Central Valley Flood Protection Board (CVFPB) and the USACE to study and evaluate ways to improve the region’s flood risk. This resulted in the San Joaquin River Basin, Lower San Joaquin River, CA Final Integrated interim Feasibility Report/Environmental Impact Statement/Environmental Impact Report (Feasibility Study) , completed by the USACE in January 20182. The recommended plan contained within the Feasibility Study was subsequently authorized by Congress and signed into law under the Water Infrastructure Improvements for the Nation Act (Public Law 115-270) Title 1, Subtitle D, Section 1401(2), dated October 23, 2018.

Implementing the plan defined in the Feasibility Study is expected to reduce flood risk to 122,000 people, over 80,000 structures , and $28.7 billion in property. USACE uses benefit -to-cost ratios for feasibility study implementation plan recommendations. In this case, the study resulted in a benefit -to-cost ratio of 7.0, meaning that for every dollar invested in the flood risk reduction project, the region receives seven times that in economic benefit. Additionally, implementation of the Feasibility Study’s recommendation s is expected to reduce expected annual damages within north and central Stockton by 83 percent.

The Congressionally authorized recommended plan found in the Feasibility Study, referred to as the Lower San Joaquin River Project (LSJRP) consists of 23 miles of levee improvements and two closure structures (Figure 2). Construction at one of those closure structures, the Smith Canal Gate, was advanced early by SJAFCA and is a critical component of the implementation and funding approach as defined in this Engineer’s Report.

After the Feasibility Study authorization, t he USACE, CVFPB and SJAFCA entered into a Project Partnership Agreement (PPA) on September 30, 2020, which defines the requirements, obligations, and responsibilities of the Federal government and the Non-Federal Sponsor (NFS), which is defined as both CVFPB and SJAFCA. The CVFPB and SJAFCA entered into a Local Project Partnership Agreement (LPPA) on September 30, 2020, that specifies the obligations of each party; this includes CVFPB’s and SJAFCA’s commitment to contribute 24.5% and 10.5%, respectively, of the total project cost.

However, the LSJRP improvements do not improve all FEMA Accredited Levees providing protection to North and Central Stockton. Figure 3 shows the area designated by FEMA as Shaded Zone X (FEMA Shaded Zone X).

The FEMA Shaded Zone X area is the area of the accredited levee system currently designated by FEMA as protected by levees from a 100-year flood. To ensure long -term accreditation and keep up with increasing regulatory requirements and engineering standards, SJAFCA will need to complete additional capital project planning, engineering, design, and implementation of projects to FEMA Accredited Levees. Ensuring continued long-term accreditation becomes more important as the impacts of flood frequency and severity worsen over time, as the system reaches its useful life, and as regulatory compliance standards become more stringent.
2 https://www.spk.usace.army.mil/Portals/12/documents/civil_works/lower_sj_river/final_eis- eir/01_San%20Joaquin%20River%20Basin%20Lower%20San%20Joaquin%20River_CA%20FINAL%20IIFR_EIS_EIR.pdf?ver=201 8-02-01-184425-453

ATTACHMENT E
4 ATTACHMENT E
5 ATTACHMENT E

San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March 16, 2023

1808000 LCMA Preliminary Engineer's Report 2023 0316.docx 6 To address the funding for the activities described above, SJAFCA and SJCFCWCD jointly investigated a strategy for generating additional revenue to provide funding for levee capital improvements and O&M services . A formal arrangement for the joint investigation and implementation of a new special benefit assessment was memorialized in an MOU between the two agencies in July 2022. The result of the coordinated effort is the Levee Construction and Maintenance Assessment (LCMA or Proposed Assessment) described further within this Engineer’s Report.

Purpose of this Engineer’s Report
This Engineer’s Report describes, in detail, the methodology for levying an assessment upon parcels that receive special benefit from the LCMA Services as defined within this Engineer’s Report. In combination with the Zone 9 Flood Control Benefit Ass essment, property tax revenues allocated to SJCFCWCD Zone 9, and SJAFCA’s AD 96-1 Assessment, this assessment is intended to provide sufficient funding for:

1. Annual O&M services necessary to maintain SJCFCWCD Zone 9 Project levees, establish a reserve fund to support routine repairs, rehabilitation, and replacement of the infrastructure , and O&M services associated with the LSJRP capital improvements.

2. Capital improvements within the greater Stockton area as defined in the LSJRP and other system improvements to ensure long-term compliance and accreditation of the FEMA accredited levees.

Report Organization
This report is divided into seven sections with tables and a section for f igures as well as f ive appendices, all described further below.

Section1 provides the background, purpose of this Engineer’s Report, and describes the report’s organization.

Section 2 outlines the authorization and process for imposing the Proposed Assessment.

Section 3 details the services to be funded by the Proposed Assessment.

Section 4 describes the financing and funding plan for LCMA Services.

Section 5 details the methodology for levying an assessment that is proportional to the special benefits received by each parcel assessed.

Section 6 describes how the annual assessment administered process.

Section 7 Provides the special benefit findings and certification by the Assessment Engineer as required by Article XIIID Section 4 (b) of California Constitution.

Appendix A provides a technical memorandum prepared by Kjeldsen, Sinnock & Neudeck, Inc. (KSN) that describes the incremental cost to operate and maintain the LSJRP levees.

Appendix B provides the financial plan cash flow model for the Capital Services funded by the Proposed Assessment.

ATTACHMENT E

San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March 16, 2023

1808000 LCMA Preliminary Engineer's Report 2023 0316.docx 7 Appendix C provides a technical memorandum prepared by R&F Engineering (R&F) that describes the supporting floodplain analyses utilized as part of special benefit analysis.

Appendix D provides the Assessment District Boundary Diagram Appendix E provides the list of the County Assessor’s use codes and identifies the assignment of Land Use Categories for use as part of the assessment methodology described herein.

Appendix F provides the list of parcels by reference to assessor parcel number (APN) subject to the Proposed Assessment as well as a schedule of the proposed assessment amounts for FY 2023/2024 (the initial maximum annual assessment roll for assessment balloting purposes).3

3 The proposed Assessment Roll included with Appendix F is reflect ive of t he Record Owners of parcels as defined by Government Code 53753 (j) which is based upon the last equalized secured property tax assessment roll. The last equalized secured property tax assessment roll of San Joaquin County prior to the mailing of the notice is the 20 22 roll (as of lien date July 1, 2022). The 1st year of the assessments collection will be fiscal year 2023/24 and thus reflective of July 1, 2023 equalized secured property tax assessment roll . SJAFCA will be responsible for applying the a ssessment methodology described in this Engineer’s Report to the 2023 roll and updating the roll presented in Appendix F should the assessment be levied in fiscal year 2023/24.

ATTACHMENT E

San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March 16, 2023

1808000 LCMA Preliminary Engineer's Report 2023 0316.docx 8

2. AUTHORITY AND PROCESS
The Levee Construction & Maintenance Assessment ( LCMA) would be imposed by S JAFCA pursuant to the authority of Government Code §54703 – 54719, the Benefit Assessment Act of 1982 (1982 Act), and consistent with the requirements of Article XIIID of the California Constitution 4 (Proposition 218), Government Code §53750 et. seq. (Proposition 218 Omnibus Implementation Act). Specifically, Government Code §54710(a) of the 1982 Act authorizes SJAFCA to levy an assessment to fund the Operations & Maintenance (O &M) costs for levees . Furthermore, under Government Code §54710.5, the assessment may include the cost of installation and improvement of the levee s. As further detailed herein, the Proposed Assessment will fund levee construction, a portion of the annual cost of levee O&M, as well as create a reserve for routine repairs, rehabilitation, and replacement of the levees.

Government Code §54711, requires that:

1. The amount of the assessment imposed on any parcel be related to the benefit received by the parcel;

2. The aggregate amount of the assessment not exceed the estimated annual cost of providing the service; and

3. The revenue derived from the assessment be used only for the services identified as the basis for assessment.

In addition, all special benefit assessments must also comply with Proposition 218 and the Proposition 218 Omnibus Implementation Act. These requirements outline the process for imposing the Assessment, including the requirement that this Engineer’s Report document the special benefits conferred by the service provided, the process for imposing the Assessment, and property owner approval through a balloting process.

This Engineer’s Report has been prepared to:

1. Contain the information required pursuant to Government Code §54716(a), including; a. a description of the services proposed to be financed through the revenue derived from the Assessment;
b. a description of each lot or parcel of property to be subject to the Assessment; c. the amount of the Proposed Assessment for each lot or parcel; d. the basis of the Assessment; and,
e. the schedule of the Assessment;

2. Determine the special benefits from the services received by benefiting properties; and,

3. Assign a method of apportioning the Proposed Assessment to benefiting parcels.

Following submittal of this report to the SJAFCA Board of Directors (Board) for preliminary approval, the Board may, by resolution, call for an assessment ballot proceeding and public hearing on the establishment of the Proposed Assessment.

4 Article XIIID of the California Constitution is a portion of the California c onstitution added by Proposition 218 that addresses the requirements of benefit assessments and is applicable here.

ATTACHMENT E

San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March 16, 2023

1808000 LCMA Preliminary Engineer's Report 2023 0316.docx 9 If the Board approves such a resolution, the SJAFCA staff will initiate the notice, protest, and hearing procedure required by Government Code §54716 a nd Article XIIID . A notice and assessment ballot will be mailed to property owners within the Proposed Assessment boundary . Such notice will include a description of the services to be funded, the total Proposed Assessment amount , the Proposed Assessment amount for each parcel owned, the duration of the Proposed Assessment, an explanation of the method of voting, and the name and telephone number of the person designated by the Board to answer inquiries regarding the Proposed Assessment and ballot proceeding process. Each notice will specify the date, time, and place of the public hearing and a summary of the ballot return procedures . Each notice will include a ballot upon which the property owner can vote for approval or disapproval of the Proposed Assessme nt and affix his or her signature. Finally, each notice will include an official postage prepaid security envelope in which the ballot must be returned.

The balloting and notice period will extend for a minimum of 45 days. Government Code 53750 (i) deems that notice is given and the 45-day period commences upon the deposit of the notice and ballot with the United States Postal Service. On the last day of the balloting period, the public hearing will be held for the purpose of receiving public testimony from property owners regarding the Proposed Assessment. Property owners will have the opportunity to provide testimony to the Board and submit their ballots at the public hearing, however, in order to be included within the tabulation, all ballots must be submitted prior to the close of the public hearing. At the public hearing, and at any time prior to the close of the public hearing, property owners may also revise previously submitted ballots.

If the votes received in favor of the Assessment, weight ed by the proportional financial obligation of the properties for which the ballots are submitted, outweigh the votes received opposing the Assessment , then the Board may continue with the formation of the Proposed Assessment district, the process of imposing the Proposed Assessment and its future levy. If the assessments are so confirmed and approved by the Board, the Assessment roll will be submitted to the San Joaquin County Auditor Controller for inclusion on the secured property tax rolls or may be directly billed by SJAFCA to the property owner for the Assessment pursuant to Government Code §54718. As outlined in Government Code §53739, the Board may levy the Assessment in future years without conducting a new ballot proceeding so long as the Assessmen t is within the stated inflation-adjusted Assessment Rate authorized by the original balloting proceeding.

ATTACHMENT E

San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March 16, 2023

1808000 LCMA Preliminary Engineer's Report 2023 0316.docx 10

3. PROPOSED SERVICES
Services Funded by the Proposed Assessment
The services to be funded by the Proposed Assessment include:

1. Levee O&M Services: O&M services are required to ensure that the design level of flood protection is maintained over time for Zone 9 Project Levees maintained by SJCFCW CD, LSJRP levees, and other levees improved in the future by SJAFCA . As footnoted in the Introduction, Project Levees are those facilities that are part of the State Plan of Flood Control . LSJRP levees are those built as part of the Federally authorized LSJRP as further defined under the Levee Capital Services section below.

2. Levee Capital Services : All work associated with the planning, design, implementation and construction of the LSJRP and other future capital improvements completed within the benefit area that ensure continued FEMA accreditation of levees providing 100-year protection into the future.

Levee O&M Services
Levee O&M Service activities may include, but are not limited to, levee inspections and evaluations, debris removal that restricts flow or damages the system, vegetation removal and control, rodent control, levee patrols, levee road resurfacing, erosion prote ction material replacement, flood fighting, and embankment repair. In addition, Levee O&M Services also includes all activities associated with maintaining the current level of flood protection received by benefiting properties . These activities include co mpliance with any existing permits, obtaining new permits, permit enforcement, removal of encroachments, coordination with State and Federal floodplain regulators and policy makers, and coordination and reporting activities that ensure compliance with FEMA , DWR , and USACE standards . These services will be performed by SJAFCA and/or local maintaining agencies, including SJCFCWCD. These agencies may utilize SJAFCA resources or other contractors to support Levee O&M Services with funding from the Proposed Assessment.

In addition to the regular on-going O&M services, the proposed assessment will also provide adequate reserves to support routine repair, rehabilitation, and replacement of levees and appurtenant facilities.

Levee Capital Services
Levee Capital Service s activities include the local contribution to the Federally authorized LSJRP and other capital improvement planning, design, and construction efforts along the flood protection system to support long-term FEMA accreditation of levees providing 100-year protection to North and Central Stockton.

The LSJRP consists of 23 miles of levee improvements and two closure structures. Construction at one of those closure structures, the Smith Canal Gate (SCG), was advanced early by SJAFCA and is a critical component of the implementation and funding approach de fined in this Engineer’s Report. The 23 miles of levee improvement as described in the Feasibility Study currently include:

Delta Front:
• 2.05 miles of fix-in-place improvements with soil-bentonite cutoff walls of various depths with

2.5 miles of geometry improvements.
• 1.1 miles of seismic fixes along two segments of Tenmile Slough.

ATTACHMENT E

San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March 16, 2023

1808000 LCMA Preliminary Engineer's Report 2023 0316.docx 11 • 1.33 miles of new setback levee along the Delta Front to eliminate the eastern portions of the Fourteenmile Slough levee.
• 0.59 miles of height improvements between 1.8 and 2.7 feet on the Delta Front. • 5 miles of erosion protection.
• Control structure on Fourteenmile Slough.

North Stockton:
• 9.4 miles of fix-in-place improvements with soil-bentonite cutoff walls of various depths. • 2.03 miles of height improvements between 1.4 and 1.6 feet in North Stockton.

Central Stockton:
• 9.2 miles of fix- in-place improvements with soil-bentonite cutoff walls of various depths. • 2 miles of levee geometry improvements along one segment of the Calaveras River and one segment of the San Joaquin River.
• 0.53 miles of height improvements of 1.8 feet.
• 0.75 miles of new levee with soil-bentonite cutoff wall on Duck Creek to address flanking of flood waters from South of Central Stockton.
• 0.28 miles of height improvements of 4 feet on the RD 404 levee. • Control structure at Smith Canal with 0.2 miles of floodwall.

As the USACE, the CVFPB, and SJAFCA advance implementation of the LSJRP , the final configuration of the improvements may be refined consistent with the intent of the original authorizat ion or any future changed authorization by Congress. The Levee Capital Services are intended to provide the flood protection benefits of the authorized project in its final configuration . In addition, any required project mitigation or permitting requirements of the project are included within the Levee Capital Services.

Capital improvements along other portions of the system for the purposes of ensuring the long -term FEMA accreditation may include feasibility studies, analyses, field investigations, engineering, design, and construction. Efforts have not yet been defined in detail for this work. Should the Proposed Assessment be approved, these efforts will be further investigated and defined over the coming years.

ATTACHMENT E

San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March 16, 2023

1808000 LCMA Preliminary Engineer's Report 2023 0316.docx 12

4. FINANCING AND FUNDING PLAN
The financing and funding plan is based on an estimated annual budget for the Levee O&M Services as well as an estimated budget and financing plan for the LSJRP and other necessary capital improvements. Levee O&M Services include both the SJCFCWCD Zone 9 Project Levee O&M as well as the incremental additional Levee O&M associated with LSJRP and related improvements; however, the budget for the incremental O&M associated with the LSJRP are accounted for within the financing plan analysis for Levee Capital Services as further described below.

Annual Budget for Levee O&M Services
The annual budget for Levee O&M Services has been estimated in two parts. First, the County’s Public Works Department, in coordination with SJAFCA, prepared an updated budget for the SJCFCWCD, Zone 9 Project levees. Second, Kjeldsen, Sinnock & Neud eck, Inc (K SN) prepared an incremental O&M budget estimate for the levees improved by the LSJRP (Appendix A). The intent is that the incremental O&M budget for the LSJRP would supplement funds from local maintaining agencies who currently operate and maint ain the existing levee system to ensure that the benefits received by the Levee Capital Services can be maintained into the future.

The budget for Levee O&M Services represents the current expectation of Fiscal Year (FY) 2023/24 costs based on both historical expenses and anticipated changes over the life of the assessment . It should be noted that the budget was developed for the purpose of determining the annual revenue required for the Proposed Assessment based on the increased costs SJCFCWCD has experienced associated with performing O&M of Zone 9 Project Levees and based on KSN’s experience operating and maintaining levees in the region. Future annual budgets approved by the Board may vary from year to year according to actual anticipated expenses and revenues.

Budget for Zone 9 Project Levee O&M
Table 1 provides a summary of the estimated FY 2023/24 budget. This budget takes into considera tion the required level of currently unfunded O&M services associated with Project levees in conjunction with the available revenues described further below.

SJCFCWCD estimates that the required total cost of O&M is $5,954,000. This estimate includes the following services: O&M, ongoing engineering support, State & Federal coordination, administration, auditing & compliance, and the legal and insurance burden associated with all services SJCFCWCD provides for Zone 9 facilities. The existing revenues available to support O&M services total $4,470,000 and are provided by the current Zone 9 Flood Control Benefit Assessment , ad valorem property taxes received by the SJCFCWCD for Zone 9, and the SJAFCA AD 96-1 Assessment. The net difference, or shortfall , is $1,484,000. This shortfall is associated with the additional costs of providing the required level of Levee O&M Services for Zone 9 Project levees.

ATTACHMENT E
Table 1
Levee Capital and Maintenance Assessment (LCMA)
Levee O&M Services Budget for Zone 9 ‐ FY 2023/24
Budget Item / Category
FY 2023/24
Budget
Operations & Maintenance [1] $5,426,000
Ongoing Engineering Support $70,000
State & Federal Coordination (Certifications, Policy & Funding) $305,000 Administration, Auditing & Compliance $65,000
Legal & Insurance Burden on Services $88,000
Subtotal Annual Services Budget $5,954,000
Current Zone 9 Assessment (Governmen t Code 56901) ($2,716,000) Zone 9 Ad Valorem Tax Apportionment ($850,000)
SJAFCA AD 96‐1 (Government Code 57594) ($904,000)
Total Current Funding Sources ($4,470,000)
Net equals Budget for Levee O&M Services $1,484,000
Source: San Joaquin County Public Works Dept. and SJAFCA [1] Includes Labor, Equipment, Supplies, Materials, Repair & Replacement for Equipment and Mitigation.

Prepared by LWA 1808000 LCMA ER Tables 2023.02.27.xlsx
13 ATTACHMENT E

San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March 16, 2023

1808000 LCMA Preliminary Engineer's Report 2023 0316.docx 14 The current Zone 9 Flood Control Benefit Assessment is utilized by the SJCFCWCD to fund the O&M of Project Levees within Zone 9. Ad valorem property taxes, which come from a portion of the County’s base 1% of net assessed value property taxes apportioned to Zone 9 of SJCFCWCD, are also used to fund Project Levee O&M services. Finally, the SJAFCA AD 96-1 is an existing assessment for parcels with the SJAFCA service area to fund O&M of the FPRP. Revenue from AD 96-1, collected by SJAFCA, is utilized to contract for services provided by SJCFCWCD on behalf of SJAFCA for the O&M of those Project Levees improved as part of the FPRP.

The Proposed Assessment will be utilized to fund the increase in cost associated with Levee O&M Services.

The budget presented in Table 1 reflects the budget for the O&M of Zone 9 Project related Levees and Channels. As costs have increased over the years, SJCFCWCD has been required to prioritize the limited resources to those areas with the greatest risk in terms of life safety and flood damages. The assess ment revenues and property taxes described above have generally been fully expended on Project Channels and Levees. Even with full expenditure of revenues on Project facilities, including depletion of reserve funding, essential maintenance for Project facilities is currently being deferred until additional funding is available. The Proposed Assessment will provide the SJCFCWCD with additional resources needed to address the increased cost of Levee O&M Services.

Budget for LSJRP Levee O&M
Table 2 provides a summary of the estimated budget for incremental O&M of the LSJRP levees. This is the increase in the estimated costs to O&M the levees to the standard s required by USACE once the LSJRP is turned over to the NFS. A portion of this estimate was prepared by KSN through an evaluation of current local maintaining agency resources and estimated cost of levee O&M upon the completion of improvements (Appendix A). The total budget for the components of the LSJRP evaluated by KSN is $425,340 escalated to January 2023 . SJAFCA has also worked as part of the implementation of the Smith Canal Gate Project to estimate the cost of ongoing O&M of the gate facility. This amount is expected to be similar to the O&M of a second gate structure at 14-Mile Slough. The cost to O&M both gates is expected to be $700,000 (in January 2023 $’s) therefore the total incremental O&M is expected to be $1,125,341. Because these costs are incurred as the LSJRP capital improvements are completed over time, the incremental O&M costs for each compl eted element has been incorporated into the financing plan for levee capital services, described below.

ATTACHMENT E
Table 2
Budget Item / Category
Estimated
Budget
[1]
Mosher Slough $20,840
Shima Tract $17,475
Fivemile Slough $4,291
Fourteenmile Slough $138,403
Tenmile Slough $31,973
Calaveras River ‐ Right $42,783
Calaveras River ‐ Left $43,072
San Joaquin River $40,717
French Camp Slough $18,317
Duck Creek $67,470
Smith Canal Gate [2] $350,000
Fourteenmile Slough Structure [2] $350,000
Capital Project $1,125,341
Source: KSN Memo and SCAAD Engineer's Report
[1] Budget as of January 2023 and utilized as part of cash flow and financing plan analysis found in Appendix B.
[2] Estimated based on SCAAD budget for O&M of the SCG
Levee Capital Services Incremental O&M Budget for LSJRP Features Levee Capital and Maintenance Assessment (LCMA)
Prepared by LWA 1808000 LCMA ER Tables 2023.02.27.xlsx
15 ATTACHMENT E

San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March 16, 2023

1808000 LCMA Preliminary Engineer's Report 2023 0316.docx 16 Financing Plan for Levee Capital Services
To determine the annual funding requirements necessary to fund the SJAFCA share of new facility capital costs and the associated incremental O&M , LWA prepared a financing plan including a cash flow analysis. The financing plan incorporates several assumptions, such as initial cost estimates, cost sharing, SJAFCA project delivery responsibilities, implementation timeline, cost escalation, SJAFCA and State advancement of the Smith Canal Gate, and bonding. These costs are described further below. Importantly, this model incorporates the incremental O&M cost of the LSJRP levee system as the O&M responsibility and funding requirements are layered in over time as project features are completed and turned over the NFS for O&M.

Initial LSJRP Cost Estimate
Project cost estimates, including contingency values , are derived from the Feasibility Study “first cost” estimate of $1,070,309,000 (2017 price levels). These values serve as the basis for the escalated costs utilized in the financing plan . Because this cost estimate was based on feasibility level information with limited information on or consideration for prior analyses of the levee system, several assumptions associated with the estimate were modified, as described herein, to prepare a realistic, reasonable, and fiscally prudent base cost.

The Feasibility Study was performed under USACE’s 3x3x3 paradigm : defined as a study requiring no more than three years, with no more than three million dollars, and undergoing t hree levels of concurrent review.

USACE contrived this concept to streamline and accelerate feasibility analyses, but it has resulted in some unintended consequences.

Detailed and informative analyses were often left for the design phase of a project, resu lting in overly conservative project cost estimates, assuming worst -case design conditions. Indeed, during the feasibility study phase, existing information about the levee system performed by the State of California’s Urban Levee Evaluation (ULE) that co uld have helped reduce the cost estimate went partially unused, and conservative assumptions were instead used.

For example, during the feasibility study phase, several reaches were identified as requiring a higher level of improvement than those identifie d from the ULE work. This resulted in higher estimated costs and higher contingencies. Although individual features were not analyzed in detail to determine specific reductions in program costs, several elements were identified as requiring much less robus t re-build. These include the improvements near Brookside and Mosher Slough.

Further, recent cost projections of Ten Mile Slough, which is currently designed and awaiting environmental clearances, are now projected to come in below those prepared in the 20 17 feasibility estimates. Further, comparing USACE cost-estimates to actual bid costs for over a dozen flood projects being implemented in the Sacramento area demonstrates that USACE estimates are always significantly conservative. In most cases, a conservative cost estimate is beneficial for future planning and helps minimize long -term financial risk; however, several principles of SJAFCA’s program are to be financially frugal with local funding and not raise more money from property owners than will be required. SJAFCA also notes that USACE is required by statute to regularly develop new costs estimates, and such estimates have a tendency to fluctuate wildly based on

ATTACHMENT E

San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March 16, 2023

1808000 LCMA Preliminary Engineer's Report 2023 0316.docx 17 market conditions, but these updated estimates do not generate actionable information un til such time as USACE incorporates the use of actual site conditions. As such, SJAFCA has decided to program funding on the lower side of the “first cost” range (i.e., lower contingency).

SJAFCA has prepared several contingency plans to mitigate for any cost increases. These include leveraging other funding sources or locally leading future phases of design and construction.

There are other funding sources that may come to fruition over the next decade. These may be used to offset upfront bond financing and/or mitigate for future increased costs. SJAFCA is currently coordinating with other flood agencies to leverage their existing, excess in-kind credit. These inter-basin credit transfers require close coordination with USACE for approval as they would b e applied to the NFS’s cost share, and they require negotiation on the amount. While the actual cost of these credits is not yet known, they would only be sold/purchased at a discount, and therefore they will “generate” additional resources for the program .

Secondly, SJAFCA is seeking credit for its prior work on Mosher Slough that would directly offset cost sharing obligation to USACE. These efforts could result in $5 -$10 Million of local funding applicable toward the local cost share of the LSJRP.

It is also feasible that SJAFCA could receive a higher state -local cost share for work on this project. Although the current cost share (70%-30%) is generous, other areas within California have seen a higher than 70% state share. For example, an additional 10% S tate cost share would result in a 33% reduction in the local funding match.

Additionally, in close coordination with USACE, SJAFCA could lead design and construction of one or more project features. Throughout the valley, locally led projects have been completed on Federal levees, resulting in cost savings from the initial USACE estimate. However, the precise features, extents, and expected saving remain uncertain and can’t be quantified at this time.

The feasibility study estimates a “first cost” of $1.070 Billion (2017 price levels, not escalated) or estimated at $1,385 Billion in the PPA (fully escalated over time). This estimate includes a 38% contingency. For the reasons described above, SJAFCA is preparing this program estimate with 23% contingency (a 15% reduction), resulting in an initial cost of approximately $910 Million (Table 3), for use in the financing plan which escalates cost over the project implementation timeline.

Cost Sharing
As previously discussed, the LSJRP is Federally authorized and led. The USACE, DWR, and SJAFCA entered into a PPA defining the cost share obligations of USACE and the NFS. DWR and SJAFCA then entered into an LPPA, defining the cost sharing obligations between the NFS s. The Federal cost share is 65%, DWR cost share is

24.5%, and SJAFCA’s cost share is 10.5%.

SJAFCA’s cost share funding will come in the form of 1) cash contributions, 2) In-kind contributions (IKC) for work at Smith Canal and any other approved credit for work performed by the NFS, and 3) lands, easements, rights-of-way, relocations, and disposal areas (LERRDs) purchases. NFS cash contributions are estimated in the financing plan after accounting for LERRDs and IKC estimates.

ATTACHMENT E
Table 3
Levee Capital and Maintenance Assessment (LCMA)
Lower San Joaquin River Project Base Budget
Budget Item / Category Cost Share $2017 Costs
[1]
Land and Damage $68,555,900
Relocation $72,250,000
Fish and Wildlife $60,268,400
Levees and Floodwalls $481,609,150
Floodway Control and Diversion Structure $45,205,550
Planning, Engineering, Design $123,165,850
Construction management $58,708,650
Capital Project $909,763,500
Federal 65.0% $591,346,275
State 24.5% $222,892,058
Local Share [2] 10.5% $95,525,168
Source: San Joaquin Area Flood Control Agency and U.S. Army Corps of Engineers [1] Cost estimate used from 2018 Feasibility Study, based on Oct 1, 2017 price levels, USACE "First Cost", with adjusted contingency to 23%; Utilized as part of financing plan found in Appendix B. [2] Local share simply based on "first cost" percent obligations, not accounting for credit from local work completed (e.g. Smith Canal Ga te)
Prepared by LWA 1808000 LCMA ER Tables 2023.02.27.xlsx
18 ATTACHMENT E

San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March 16, 2023

1808000 LCMA Preliminary Engineer's Report 2023 0316.docx 19 Smith Canal Gate
SJAFCA and DWR are delivering the Smith Canal Gate (SCG) project as advanced work that directly supports the overall LSJRP. USACE recognizes this as IKC, and it is assumed all costs will be recognized and attributed toward the NFS cost sharing requirements. For the purposes of the cash flow financing plan for the LSJRP, the assumed creditable cost of the SCG project is $96.8 Million. It is assumed that upon review of project expenditures, USACE would approve credit in this full estimated amount. The $96.8 M illion estimate is reflected in the total project cost for the purposes of calculating cost share percentages. It is also used as IKC to offset immediate NFS cash contribution requirements.

The costs of the SCG project have been funded from a combination of grant funding provided to SJAFCA by DWR and local funding from SJAFCA generated by the Smith Canal Area Assessment District (SCAAD). If the LCMA is approved by property owners and the ass essment district if formed by the SJAFCA Board, the following actions would take place:
• Assessments authorized to be levied by the SCAAD would cease to be levied. In other words, the LCMA would supplant the SCAAD.
• The current outstanding bonds issued by S JAFCA to finance the local share of the project, which are secured by SCAAD assessment revenues would be redeemed by SJAFCA. See Bond Plan discussion below.

To account for and recognize the Levee Capital Services benefits provided to date by the SCAAD assessments, an adjustment factor has been applied to the properties located within the SCAAD. See SCAAD Factor discussion below.

LERRDs
LERRDs are a line-item estimate in the Feasibility Study and the timing and amounts of LERRDs purchases are incorporated into the financing plan. LERRDs have been escalated based on current project implementation assumptions as defined here and estimated at approximately $210 Million.

Project Implementation Timing
Project implementation timing has been revised from the initial estimates prepared for the Feasi bility Study by USACE. The sequence of reach implementation and start timing has been updated to reflect recent project developments (including status of design efforts as of mid-2022, Federal funding commitments, and available personnel and project team resources).

Given the status of this program and timelines of similar programs in the Central Valley, the estimated time to project completion used for this engineer’s report is twenty years . There fore, the LSJRP expenditures associated with construction continue into 2043 and may extend for several years to complete financial and project close-out with USACE and DWR.

Cost estimate s are escalated in alignment with the estimated reach delivery timelines . LWA utilized construction cost escalation of 2.4%, based on the average annual growth rate from 2010 to 2020 from the Department of General Services (DGS) California Construction Cost Index (CCCI). This analysis excludes 2020-

ATTACHMENT E

San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March 16, 2023

1808000 LCMA Preliminary Engineer's Report 2023 0316.docx 20 present, which reflects the effects from aftermath of COVID-19 years and the current inflationary environment in favor of reflecting a longer-term average construction escalation over the entire period of the project.

Assessment Timing
The first year of assessment collection would occur in FY 2023/24. The duration of the capital component of the assessment is assumed and is to be authorized for 30 years from a final bond issuance, which is expected to take place in 2038.

Bond Plan
Based on the project implementation timeline, cash contributions to USACE, and the redemption of the outstanding SCAAD Assessment Revenue bonds, SJAFCA plans to issue bonds secured by LCMA assessment revenues as soon as feasible after the formation of the Assessment District . The timing of the project implementation dictates the timing and amount of bond financing versus pay-go revenues to cover expected costs. The next bond issuance is expected to occur in 2033. The financing plan currently assumes that annual assessment district revenue s and IKC would cover much of the cost outlays and funding match to USACE . A third and final bond issuance would occur in 2038. The financing plan assumes that each bond issuance would be structured as a conventional 30-year financing and to be paid from annual assessment collections.

Cash Flow Analysis
A cash flow analysis was developed in quarterly periods for years 2022 through 2049, however, is presented in annual periods here. The cost projections were spread over time as described above. The financing plan assumes an initial assessment need of $6.2 Million beginning in FY 2023/24 for Capital Services . The initial Capital Services budget includes the LSJRP costs, District operational soft costs to deliver LSJRP, defeasance of the existing SCAAD bonds, as well as the incremental O&M required to support this project long-term. The initial O&M assessment need is $1.125 Million (2022) and is assumed to continue in perpetuity . The assessment is assumed to be escalated annually based on the Consumer Price Index (CPI-W) for San Francisco- Oakland-Hayward, CA. For purposes of the cash flow analysis, escalation of the assessment was assumed to be 2.4% annually. Upon final payment of bonds and completion of the LSJRP, the capital portion of the annual assessment is assumed to end.

The financing and funding plan is detailed in the cash flow shown in Appendix B.

Total Estimated LCMA Budget
The total LCMA budget combines the FY2023/24 O&M budget for Zone 9 Project levees and the resultant capital FY2023/24 budg et developed in the cash flow and financing plan analysis. These budgets are summarized in Table 4 and result in a total estimated LCMA FY 2023/24 budget of $7,684,000.

ATTACHMENT E
Table 4
Levee Capital and Maintenance Assessment (LCMA)
Assessment District Budget ‐ FY 2023/24
Budget Item / Category
FY 2023/24
Budget
Levee O&M Services Budget [1] $1,484,000
Levee Capital Services Budget $6,200,000
Total Budget [2] $7,684,000
Source: San Joaquin County Public Works Dept. and SJAFCA [1] Includes Labor, Equipment, Supplies, Materials, Repair & Replacement for Equipment and Mitigation.
[2] Assessment can be escalated annually, according to CPI‐W San Francisco‐Oakland‐Hayward, not to exceed 4% (Reference Section 6, Annual Escalation of the Assessments) Prepared by LWA 1808000 LCMA ER Tables 2023.02.27.xlsx
21 ATTACHMENT E

San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March 16, 2023

1808000 LCMA Preliminary Engineer's Report 2023 0316.docx 22

5. ASSESSMENT METHODOLOGY
General Discussion
Requirements of Proposition 218
To levy an assessment for a property related service such as flood control, Proposition 218 has certain substantive requirements that the local agency must comply with. The local agency must:
• Separate the general benefits provided by service(s) from the special benefits conferred on a parcel; • Identify the parcels that have special benefits conferred on them by the facility and/or service; • Calculate the proportionate special benefit for each parcel in relation to th e entirety of the benefits provided by capital and O&M services being funded;
• Apportion the costs of services to each parcel that receives special benefit in relation to that proportion; and
• Ensure that the total assessment levied does not exceed the reaso nable cost of the proportionate special benefit conferred on each parcel.

Special Benefits vs. General Benefits
Proposition 218 requires any local agency proposing to increase or impose a special assessment to “separate the general benefits from the special benefits conferred on a parcel.” (Cal. Const. art. XIIID §4). The rationale for separating special and general benefits is to ensure that property owners are not charged a special benefit assessment in order to pay for general benefits provided to the properties or general public at large. Thus, a local agency carrying out a project that provides both special and general benefits may levy an assessment to pay for the special benefits but must acquire separate funding to pay for the general benefits.5 A special benefit is a particular and distinct benefit over a nd above the general benefits conferred on real property located within the agency’s boundary or to the public at large. The total cost of the services must be apportioned among the properties being assessed based on the proportionate special benefit the properties will receive. Moreover, the governmental agency must demonstrate through a balloting process that the ballots submitted in opposition to the assessment do not exceed the ballots submitted in favor of the assessment, weighted according to the pr oportional special benefit and financial obligation of the affected properties.

Because flood control work has an obvious indirect relationship to the provision of general benefits and may, upon first blush, appear to be general benefits, the issue of gen eral benefits merits further discussion. For example, the facilities to be funded by the assessment will protect parks that are used by people regardless of whether they own property within the floodplain or not (the general public). But this indirect re lationship does not mean that these facilities or services will themselves provide any general benefits. Rather, they will provide special benefits to all parcels within the floodplain, including special benefits to public parcels (such as parks) that are themselves used in the provision of general benefits.

5 Silicon Valley Taxpayers’ Assn., Inc. v. Santa Clara County Open Space Authority, (2008) 44 Cal. 4th 431, 450.

ATTACHMENT E

San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March 16, 2023

1808000 LCMA Preliminary Engineer's Report 2023 0316.docx 23 More to the point, the public at large will be paying for the special benefits provided to public property, and specially benefited property owners’ assessments will not be used to subsidize general be nefits provided to the public at large or to property outside the district. All property that is specially benefited will be assessed, including schools, parks and other parcels used in the provision of general benefits. Assessing agencies are required t o assess and levy the assessment on all specially benefited property, including publicly owned property, within the assessment district. 6 Thus, the general public will pay for the provision of flood control services because the assessed public agencies w ithin the assessment district will use general taxes or other revenues to pay their assessments.

In this instance, the Levee Capital and O&M Services provide both a general benefit to the public at large and a special benefit to those properties located wi thin the boundaries of the Proposed Assessment by virtue of preventing flood waters due to uncontrolled flood from collecting on or flowing over a parcel and causing damages as a result of inundation. The special benefits provided by the services have bee n calculated for all parcels within the boundaries of the Proposed Assessment. The boundaries of the proposed district consists of only those parcels within the levee protected area.

The special benefit provided to each parcel varies based on the relative avoided damage from flooding. The relative avoided flood damages are based on an uncontrolled flood resulting from a breach along the levee system. The avoided flood damages are a function of parcel size, land use and the depth of flooding from each breach scenario, and, for Levee O&M services, the length of levee represented by each breach.

As noted above, special benefits are those “particular and distinct over and above general benefits conferred on real property located in the district or to the public at large.” Cal. Const. art. XIIID §2(i). By contrast, general benefits provided to the public at large could be discussed in terms of general enhanced property values, provision of general public services such as police and fire protection and recreat ional opportunities that are available to people regardless of the location of their property. See e.g., Cal. Const. art. XIIID §§2(i), 6(2)(b)(5); Silicon Valley Taxpayers, 44 Cal. 4th 431. 450–56. In this case, general benefits can be identified as the ability to move through and across the benefited area. The following considerations were evaluated to distinguish the general benefits by the Levee Capital and O&M Services.

Public Property
The Levee Capital and O&M Services will protect certain public properties (e.g., government buildings, schools, and parks). While the use of these public properties is a general benefit, the public properties themselves are protected by the flood protection system and receive a special benefit from the Levee Capital and O&M Services in the same manner as private property. All public properties have been included in the determination of special benefit, as described in more detail under the Assessment Apportionment Methodology below. With the exception of Federal Properties, there is no general benefit for Non-Federal public properties to be funded by the Proposed Assessment because the public properties will be assessed based on the special benefit received. As discussed further below, Federal properties are exempt from paying

6 Reference Cal. Const. ar t. XIIID § 4(a) with respect to the requirement to assess and Manteca Unified School District v.

Reclamation District No. 17 (2017) 10 Cal.App.5th 730 with respect to the requirement to levy.

ATTACHMENT E

San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March 16, 2023

1808000 LCMA Preliminary Engineer's Report 2023 0316.docx 24 an assessment levied by a local agency. While the special benefit and associated assessment is calculated without consideration of the Federal property exemption, the lost revenue cannot be reapportioned to assessed property owners. Therefore, the Levee Capital and O&M Services provide a general benefit by protecting federally owned property against flood damages, and the lost assessment revenue must be funded by other revenue sources.

Local Streets and Collectors
The Levee Capital and O&M Services will protect certain local streets and collectors. These roads are primarily used to access properties, as opposed to thoroughfares discussed separately below. The boundary of the Proposed Assessment has been narrowly drawn to include only those properties receiving special benefit from Levee Capital and O&M Services. Therefore, the benefit from Levee Capital and O&M Services to local streets and collectors is captured by assessing the properties they serve – as these roads have no value but in providing access to the specially benefitted parcels, and protecting these roads is a means to provide special benefit to these parcels.

Thoroughfares
The Levee Capital and O&M Services will also protect certain thoroughfares within the boundary of the Proposed Assessment. These roads are distinct from local streets and collectors in that these roads serve as primary transit routes within, through and across the community. These roads are used by the public at large regardless of residency, destination, or purpose. Therefore, the protection of these thoroughfares provides a general benefit that must be separated from the special benefit conferred on p arcels by the Proposed Assessment and cannot be funded by the Proposed Assessment. Further discussion supporting the quantification and separation of this general benefit from the special benefit is provided below.

Assessment Boundary
The Proposed Assessment Boundary encompasses all properties that receive a special benefit from Levee Capital and O&M Services. Properties receiving special benefit from the Levee O&M Services were identified through the flood breach analyses prepared by R&F Engineering (R&F). Properties receiving special benefit from the Levee Capital Services were identified from a combination of floodplain mapping sources . The analyses completed by R&F have been documented and incorporated into this Engineer’s Report by reference and attached as Appendix C.

Hydraulic Analyses Performed to Support the Assessment Methodology Levee Breach Analysis for Levee O&M Services on Zone 9 Project levees To determine the avoided flood damages as a result of the Levee O&M Services on the Zone 9 Project levees, as described in Appendix C, R&F utilized an existing levee breach analysis that evaluated 72 different breach scenarios along the SJCFCWD Zone 9 Project levees. The resulting floodp lain from each breach was overlaid on the San Joaquin County Geographic Information System (GIS) parcel shapefile to determine the average flood depth and area of flooding for each individual parcel for each breach scenario. The resulting average flood depth was used as one of the inputs to the USACE Depth-Damage functions to calculate avoided flood damage. R&F also identified the length of levee represented by each breach to apportion avoided flood

ATTACHMENT E

San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March 16, 2023

1808000 LCMA Preliminary Engineer's Report 2023 0316.docx 25 damages across the project levee reaches maintained by Z one 9. The representative levee length s can be found in Table 5. To account for the situation where a Project levee was maintained by an agency other than SJCFCWCD, the portion of that reach of levee maintained by others was subtracted from the representative levee length. As a result, a 1.4 -mile portion of levee along the Calaveras River maintained by Rec lamation District 2074 was removed from the representative levee length associated with the CSR R1 breach analysis.

R&F’s hydraulic analysis included a channel overtopping scenario to determine flood depths with no levee breaches when the channels and leve es overtop when their capacity is reached. As the channel overtopping is not prevented by Levee O&M services, this additional scenario presented in R&F’s analyses was not utilized in the analysis of special benefits.

Levee Breach Scenarios for Levee Capital Services on LSJRP and 100-year Accreditation Assurance Properties receiving special benefit from the Levee Capital Services (and associated incremental levee O&M for the LSJRP) were identified using a combination of floodplain mapping that included:
• The 100-year composite without project floodplain based on breaches of levees to be improved by the LSJRP7;
• The FEMA Shaded Zone X area within north and central Stockton; and, • Additional hydraulic modeling showing the extent of the inundation from breaches of upstream FEMA Accredited Levees prepared by R&F.

To determine the avoided flood damages as a result of the Levee Capital Services from the improvements to the levee system associated with the LSJRP and FEMA Accredited levees, the Assessment Engineer utilized the without project floodplain mapping from the Feasibility Study as well as the floodplain mapping for breaches of FEMA accredited levees. The Feasibility Study does not define one single protection level but looks at levee assurances at a suite of flood scenarios , including the 100 -year event . For the purpose of this Engineer’s Report, the Assessment Engineer determined that the USACE’s 100-year mapping best represents the level of service provided by the improved project and provides an appropriate comparison to the FEMA Shaded Zone X area. A composite without-project floodplain map, utilizing USACE floodplain mapping data, was prepared to identify the specific area benefiting from the improvements of LSRJP Project levee s. To determine the extent of the floodplain for properties benefiting from FEMA Accredited levees, next, the Assessment Engineer overlaid the composite floodplain from breaches along FEMA Accredited levees prepared by R&F Engineering.

This designated the extent of the area benefiting from Levee Capital Services for FEMA Accredited Levee.

Because different sources of floodplain mapping were combined, the floodplain mapping associated with the FEMA Accredited levee breaches was only utilized to inform the extent of the benefit area from Levee Capital Services, not the depth of flooding for the purpose of calculating avoided flood damages.

7 As noted above, floodplain mapping for these breaches is based on hydraulic modeling completed by the USACE. Reference the USACE Feasibility Study.

ATTACHMENT E
Table 5
Levee Capital and Maintenance Assessment (LCMA)
Representative Levee Lengths
Breach name Levee  Length (Miles) Breach  name Levee  Length (Miles) Brc L10 2.3563 Lmh R1 1.9343
Brc L11 0.4907 Mhc L1 0.4615
Brc L13 0.5117 Mhc L2 1.3213
Brc L14 1.2882 Mhc R1 2.4343
Brc L2 2.7578 Mhd L1 0.7099
Brc L3 0.9300 Mns L1 0.8855
Brc L4 1.2738 Mns L2 1.3696
Brc L5 0.6320 Mns R1 0.8117
Brc L6 0.8283 Mns R2 1.5242
Brc L7 0.4238 Mpc L1 0.4808
Brc L8 0.9540 Mpc L2 0.9664
Brc L9 1.6391 Pca L1 0.8861
Brc R1 1.4009 Pdc L1 0.4747
Brc R10 0.8685 Pdc L2 0.7654
Brc R11 1.5526 Pdc R1 0.4658
Brc R12 0.5926 Pdc R3 0.8128
Brc R13 1.1358 Pdc R6 1.3186
Brc R14 1.1888 Pxs L1 1.5965
Brc R3 2.0168 Pxs L2 0.8936
Brc R4 1.1972 Pxs R1 0.3875
Brc R5 0.6819 Pxs R2 1.2298
Brc R6 1.1045 Pxs R3 0.9059
Brc R7 1.0703 Sdc L1 0.7090
Brc R8 0.3499 Sdc L2 0.8142
Brc R9 1.4818 Sdc L3 0.4382
Csr L1 3.1824 Sdc L4 0.9177
Csr L2 1.7846 Sdc L5 0.6785
Csr L3 2.6353 Sdc L6 0.6670
Csr R1 2.4215 Sdc L7 0.5747
Csr R2 1.0034 Sdc R3 2.8152
Csr R3 0.9816 Sdc R4 0.8204
Csr R4 1.4676 Sdc R5 1.1742
Csr R5 1.0943 Spc L1 0.8003
Fcs L1 2.8398 Spc R1 0.3657
Fcs R1 3.1873 Wrs L1 0.8674
Lmh L1 1.9767 Wrs R1 0.2602
Source:  Appendix C ‐ Assessment District Floodplain Analysis, DATE, prepared by R&F.

Prepared by LWA 1808000 LCMA ER Tables 2023.01.24
26 ATTACHMENT E

San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March 16, 2023

1808000 LCMA Preliminary Engineer's Report 2023 0316.docx 27 The Assessment Engineer considered all of this floodplain mapping to develop and designate the area receiving benefit from Levee Capital Services. Figure 4 superimposes these three floodplain mapping sources and identifies the boundary of the area receiving benefit from Levee Capital Services.

Assessment District Boundary Diagram
All of the mapping sources have been combined to identify the overall area of benefit from Levee Capital and O&M Services. Figure 5 identifies the designated boundaries of the Levee Capital and O&M Services as well as the overall Proposed Assessment Boundary. The official Assessment District Boundary Diagram is included within Appendix D.

Because the Proposed Assessment Boundary does not align with parcel boundaries and parcel boundaries can change over time, a process for regularly determining those parcels within the boundary subject to the assessment is warranted. (Reference

ATTACHMENT E

San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March 16, 2023

1808000 LCMA Preliminary Engineer's Report 2023 0316.docx 28 Application of the Assessment Boundary to Parcels below, for further discussion.) Accounting for Uncertainty in the Breach Analysis Results To account for the uncertainty associated with the hydraulic modeling assumptions , the difference in modelling tools leveraged (i.e., R&F analysis vs. USACE analysis vs. FEMA maps), and the accuracy of underlying LiDAR data used to generate the floodplains from each breach scenario (for R&F analysis), all flood depths were rounded down to the nearest foo t. This rounding down of flood depths also accounts for the affects that any elevation variation within an individual parcel would have on shallow flooding. Further, given the uncertainty of flood depths and assumptions, for any parcel that is flooded based the analyses conducted or the review of the three flood map ping sources, the Assessment Engineering assigned a minimum flood depth of one foot.

The R&F hydraulic model used a standardized approach of calculating the floodwaters from the levee breach on a 250-foot square (1.4 acre) grid pattern and reporting the average depth for each grid block. Based on this grid block size, multiple parcels may reside within a single grid block, or a single parcel may span multiple grid blocks. Therefore, for parcels that are partially flooded along the boundary of the floodplain from a levee breach, the level of accuracy for the area of flooding for these parcels is uncertain. To account for this uncertainty, flood damages were excluded for parcels along the fringe of the boundary with less than 95% of their boundary within Levee Capital and O&M Service Boundary.

Assessment Apportionment Methodology
The methodology for apportioning the Proposed Assessment to each parcel in the Proposed Assessment District is based first on quantifying the total benefits received, in terms of benefit units, by each parcel from the Levee Capital and O&M Services and then second, separating the General Benefits from the Special Benefits, then third, determining each parcel’s proportionate share of total benefits received, again in terms of benefits units, and finally allocating the Proposed Assessment, in terms of dollars to each parcel based upon its proportionate share of total benefit units. Through this approach, each parcel’s share of the total Proposed Assessment would be equivalent to its proportionate share of benefit received from the Service s. Because the General Benefits have been separated from the Special Benefits and only the Special Benefits are assessed to parcels the requirement of Proposition 218 have been met.

ATTACHMENT E
29 ATTACHMENT E
30 ATTACHMENT E

San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March 16, 2023

1808000 LCMA Preliminary Engineer's Report 2023 0316.docx 31 The special benefit conveyed to a parcel from Levee Capital and O&M Services (in terms of Levee Benefit Units) is based on the flood damage reduction received by the parcel due to the decreased likelihood of flooding caused by a levee failure.

The methodology for calculating Levee Capital and O&M Benefit Units for each parcel utilizes the following property characteristics:

1. The size (acreage) of each parcel;

2. The Land Use Category assigned to each parcel;

3. The average structure size (square footage) per acre for each Land Use Category or sub-Category;

4. The depth of flooding from each breach scenario affecting the parcel;

5. The Relative Land Damage Rate per acre;

6. The Structure Damage Rate per square foot;

7. Whether the parcel was located within the prior SCAAD Assessment; and

8. Length of levee represented by each breach scenario (for Levee O&M Services for Zone 9 Project levees only).

A minimum flood damage reduction benefit was determined for all parcels with more than 95% of their area included within the Boundary. The minimum benefit was applied in the event a parcel’s calculated flood damages was less than the minimum calculated benefit. This approach accounts for uncertainty in the model as a result of utilizing a finite number of flood breach analyses where a parcel’s resulting inundation was nominal. This minimum benefit calculation is further described on Page 34.

Property Characteristics
The following property characteristics were developed for apportioning benefit. A summary of the property characteristics data is provided in Table 6.

Land Use Categories
Multiple land use codes are used by the San Joaquin County Assessor to categorize the properties within the boundaries. Each land use c ode was evaluated and assigned to a generalized Land Use Category (e.g.:

Agricultural, Single-Family Residential, Commercial, etc.) for the purpose of identifying characteristics of each category for use in apportioning special benefit ( Appendix E). A ran dom sample of parcels for each County land use code was analyzed by reviewing aerial photographs to ensure that it had been assigned to the appropriate Land Use Category. The Land Use Categories are generally described as follows:

Agricultural land was characterized as large productive or unproductive land outside the urban area. No differentiation was made to differentiate between the crop types or use for livestock grazing.

Blended parcels are large parcels with multiple land uses present. The characteristics of these parcels are typically unique and require dedicated apportionment factors that are weighted by the portion (percent) of the parcel associated with each land use. An example would be a single large lot zoned as commercial that is half developed for a commercial use and the other half is vacant.

ATTACHMENT E
Table 6
Levee Capital and Maintenance Assessment (LCMA)
Summary of Assessed Property Characteristics
Land Use Category Parcel Count Total  Acres
Agricultural 767 23,767
Blend 40 1,886
Commercial 3,378 3,124
Industrial 944 3,043
Mobile Home 143 304
Multi‐Family Residential 5,904 1,336
Open Space 2,575 6,640
Open Space ‐ Developed 3,432 3,375
Rural Residential 1,071 3,292
School 166 1,311
Single‐Family Residential 75,741 14,159
Total 94,161 62,236
Source: Parcel Quest, San Joaquin County GIS and R&F Engineering Prepared by LWA 1808000 LCMA ER Tables 2023.02.27.xlsx
32 ATTACHMENT E

San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March 16, 2023

1808000 LCMA Preliminary Engineer's Report 2023 0316.docx 33 Commercial is characterized by properties with office, retail or public service buildings. This Land Use Category includes hotels, shopping centers, restaurants, offices, hospitals, etc. Some parcels within this Land Use Category have been assigned to a sub-category of Commercial Building Only. Parcels in this sub- category are commercial parcels with minimal acreage dedicated to parking and common areas within a larger commercial development. Parcels in this sub -category have adjacent parcels dedicated to supporting parking and other common areas associated with commercial uses.

Industrial is characterized by manufacturing, storage and processing facilities. This Land Use Category includes warehouses, manufacturing, processing, distribution, and public utilities.

Mobile Home Park is exclusively properties desig ned specifically for multiple mobile home structures.

This category also includes individual parcels with Mobile Home Residential structures.

Multi-Family Residential is characterized as four or more dwelling units on a parcel. This Land Use Category includes apartments, condominiums, and townhouses. Condominium parcels within this Land Use Category have been assigned to a sub-category of Multi-Family Residential Condominium. Parcels in this sub-category are parcels designated as Condominium Units (Code 11) or Planned Unit Residential Development (Code 12) by the San Joaquin County Assessor. Parcels in this sub -category have minimal acreage not covered by structures and have adjacent parcels with open areas.

Open Space is characterized by properties wi th limited hardscape, without structures, that have been developed for their ultimate use. This Land Use Category includes parks, sports fields, bike paths, common areas, etc.

Open Space Developed is characterized by properties that do not have a structure, however, are generally ready to be built on. This Land Use Category includes parcels in developed areas that have been prepared for construction, parcels that are generically described as “vacant”, and parcels that are entirely used as a parking lot.

Rural Residential are large lots with a Single -Family Residential structure outside the urban areas with limited amount of hardscape.

School properties are characterized as educational campuses, but do not include conversion of other land use categories for education activities (i.e. a commercial parcel utilized by a trade school). School properties can be public or private.

Single-Family Residential properties are characterized by three or fewer single-family dwelling structures on a parcel. This Land Use Category includes land with duplex and triplex buildings as they generally have the same physical characteristics as other single-family residences.

Parcel Size
The size of the parcel is used to appropriately apportion the special benefit from Levee Capital and O&M Services. Parcel data was obtained from San Joaquin County Assessor’s data acquired through ParcelQuest.

Parcel data was also obtained from the San Joaquin County Community Development Department GIS group

ATTACHMENT E

San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March 16, 2023

1808000 LCMA Preliminary Engineer's Report 2023 0316.docx 34 shapefiles. Where any significant discrepancy existed between the two sources, satellite imagery was used to measure and identify the more reliable source.

Average Structure Size per Land Use Type
Structure sizes were obtained from San Joaquin County Assessor’s data acquired through Parc elQuest. The average structure size was calculated by summing the total square footage from all parcels for each land use and dividing by the total acres of all parcels with structures for each land use. Table 7 summarizes the number of parcels, total parcel acreage and total structure square -footage of the parcels used to determine the average structure size associated with each Land Use Category.

Levee Capital and O&M Benefit Units
In general, flood damages were quantified for land and structures based on the depth of flooding. Levee O&M Benefit Units are calculated based on the levee breach modeling performed by R&F, as discussed above. Levee Capital Benefit Units were calculated utilizing the Feasibility Study floodplain modeling and floodplain modeling utilized to determine the extent of the Capital Boundary, as discussed above. Benefit unit calculations for each of these components are presented below, and then these two components are normalized to determine the total benefit units from both services.

Levee O&M Benefit Units
Levee O&M Benefit Units ( OBU) are equal to the avoided flood damage to a parcel as a result of the Levee O&M Services associated with the Zone 9 Project levees. For the purpose of this assessment, flood damages were quantified for land and structures based on the depth of flooding from each of the breach scenarios.

The OBU for each property is calculated using the following formula:

OBU = Total [Weighted Flood Damage] for all Breach Scenarios Where, for each Breach Scenario:

Weighted Flood Damage = [Avoided Flood Damage] x [Representative Levee Length] Avoided Flood Damage = [Levee Breach Damage]
Levee Breach Damage = [Land Damage] + [Structure Damage] Land Damage = [Parcel Size] x [Relative Land Damage Rate per Acreby land use] Structure Damage = [Average Structure SQFT] x [Parcel Size] x [Structure Damage Rateby structure type] Minimum OBU within Zone 9
For parcels within the Boundary shown in Figure 5 (Page 30) that have been determined to benefit from Zone 9 levee maintenance but not inundated by any of the individual levee breach analysis scenarios, a minimum LBU is calculated as follows:

OBU = [1,000 ft of Levee] x [Parcel Size] x [Relative Land Damage Rate]

ATTACHMENT E
Table 7
Levee Capital and Maintenance Assessment (LCMA)
Average Structure Size per Acre
Land Use Category Parcel Count Acres Structure  Sq. Ft. Average Structure Sq. Ft/Acre
[1]
Agricultural N/A N/A N/A N/A
Blend N/A N/A N/A N/A
Commercial 865 1,078 9,531,904 8,800
Commercial Building Only [2] 140 41 1,522,633 36,800
Industrial 407 1,351 16,827,510 12,400
Mobile Home 108 153 156,072 1,000
Multi‐Family Residential 2,106 1,065 17,644,638 16,500
Multi‐Family Residential Condominium [3] 3,625 94 4,050,564 43,000 Open Space N/A N/A N/A N/A
Open Space ‐ Developed N/A N/A N/A N/A
Rural Residential 1,027 3,096 2,048,467 600
School 29 233 516,174 2,200
Single‐Family Residential 75,453 13,976 126,523,952 9,000 Source: Parcel Quest, San Joaquin County GIS and R&F Engineering [1] Includes only parcels with structure building sq. ft for the purpose of calculating average structure sq. ft. per parcel. [2]  Represents commercial parcels with minimal acreage dedicated to parking and common areas within commercial developments.  Parcels in this sub‐category of commercial have adjacent parcels dedicated to supporting parking and other common areas within a large
r commercial development.  As a result the Average Structure / Sq. Ft. is much higher than the remaining parcels in the balance of the Commercial Land Use Category. [3] Represents residential multi‐family condominiums, specifically San Joaquin County use code 11 and 12.  Parcels in this Multi‐ Family Resi
dential sub‐category have minimal acreage not covered by structures and have adjacent parcels with open areas.  As a result the Average Structure / Sq. Ft. is much higher than the remaining parcels in the balance of the Multi‐Family Residential Land Use Category.

Prepared by LWA 1808000 LCMA ER Tables 2023.02.27.xlsx
35 ATTACHMENT E

San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March 16, 2023

1808000 LCMA Preliminary Engineer's Report 2023 0316.docx 36 Relative Land Damage Rate per Acre
The Relative Land Damage Rate per Acre represents the relative damage to site improvements (e.g. landscaping, utilities, etc.) that occurs as a result of inundation and deposition of sediment carried in floodwaters. The Relative Land Damage Rate per Acre was determined by assigning a Relative Land Value per Acre to each land use category and applying a 10% damage factor to the Relative Land Value per Acre.

Table 8 summarizes the Relative Land Damage Rate for each Land Use Category.

Structure Damage Rate
The Structure Damage Rate is calculated based on the methodology used in the UASCE Flood Damage Analysis (FDA) pro gram. The FDA program assigns a relative Structure Replacement Value according to type of structure and estimates the percent structure damage based on the depth of flooding . Similarly, the FDA program assigns a relative Contents Replacement Value accordin g to type of structure and estimates the percent of contents damage based on the depth of flooding (Table 9 & Table 10). Table 11 summarizes the OBU’s by Land Use Category. Because an average structure size rate per acre was utilized for calculating structure damages, for the O&M Benefit unit calculations, the structure sizes calculated were capped at 5,000 square feet per parcel for single family residential.

Levee Capital Benefit Units
Levee Capital Benefit Units (CBU) are equal to the avoided flood damage to a parcel as a result of the Levee Capital Services. For the purpose of this assessment, flood damages were quantified for land and structures based on the depth from the without LSJRP hydraulic modeling and also through preventing flooding within this same leveed area due to the failure of a FEMA 100-year accredited levee.

The CBU for each property is calculated using the following formula:

CBU = Total Avoided Flood Damage
Avoided Flood Damage = [Levee Breach Damage] x SCAAD Factor SCAAD Factor = 0.852
Levee Breach Damage = [Land Damage] + [Structure Damage] Land Damage = [Parcel Size] x [Relative Land Damage Rate per Acreby land use] Structure Damage = [Average Structure SQFT] x [Parcel Size] x [Structure Damage Rateby structure type] Minimum flood depth
All parcels, which reside in the Capital Boundary flood plain receive flood protection benefits from FEMA accredited levees. As such, all parcels within the Capital Boundary of the Proposed Assessment are assumed to have a minimum flood depth of 1’ for the purpose of calculating avoided flood damage to approximate the special benefit associated with regulatory accreditation.

ATTACHMENT E
Table 8
Levee Capital and Maintenance Assessment (LCMA)
Relative Land Damage Rate
Land Use Category Relative Land
Value per Acre
Relative Land
Damage Per Acre
AB  = A X 10%
[1]
Agricultural [2] $25,000 $2,500
Commercial $70,000 $7,000
Industrial $70,000 $7,000
Mobile Home $50,000 $5,000
Multi‐Family Residential $70,000 $7,000
Open Space $10,000 $1,000
Open Space ‐ Developed $40,000 $4,000
Rural Residential $25,000 $2,500
Single‐Family Residential $50,000 $5,000
School $41,000 $4,100
[2] Includes Crop Damage.
[1] Relative land value based on previous Engineer's Reports prepared in the region.

Prepared by LWA 1808000 LCMA ER Tables 2023.02.27.xlsx
37 ATTACHMENT E
Table 9
Levee Capital and Maintenance Assessment (LCMA)
Structure Replacement Value and Depth Damage
Land Use Structure
Replacement Value
D e p t h 0 123456789 1 0 1 1 1 2 1 3 1 4 1 5
Agricultural [1] $111.67 11.4% 19.3% 26.5% 33.2% 39.3% 44.7% 49.7% 54.1% 58.0% 61.5% 64.5% 67.1% 69.3% 71.2% 72.7% 74.0% Commercial [2] $85.56 7.0% 21.7% 30.2% 31.2% 32.4% 32.4% 39.8% 42.8% 51.7% 53.1% 54.1% 61.8% 64.8% 64.8% 65.5% 86.1% Industrial [4] $54.51 7.0% 21.7% 30.2% 31.2% 32.4% 32.4% 39.8% 42.8% 51.7% 53.1% 54.1% 61.8% 64.8% 64.8% 65.5% 86.1% Mobile Home [5] $45.85 9.9% 44.7% 45.7% 96.5% 96.5% 96.5% 96.5% 96.5% 96.5% 96.5% 96.5% 96.5% 96.5% 96.5% 96.5% 96.5% Multi‐Family Residential [6] $84.40 11.4% 19.3% 26.5% 33.2% 39.3% 44.7% 49.7% 54.1% 58.0% 61.5% 64.5% 67.1% 69.3% 71.2% 72.7% 74.0% Open Space $0.00 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Open Space ‐ Developed $0.00 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Rural Residential [7] $111.67 11.4% 19.3% 26.5% 33.2% 39.3% 44.7% 49.7% 54.1% 58.0% 61.5% 64.5% 67.1% 69.3% 71.2% 72.7% 74.0% Single‐Family Residential [8] $111.67 11.4% 19.3% 26.5% 33.2% 39.3% 44.7% 49.7% 54.1% 58.0% 61.5% 64.5% 67.1% 69.3% 71.2% 72.7% 74.0% School [3] $144.46 7.0% 21.7% 30.2% 31.2% 32.4% 32.4% 39.8% 42.8% 51.7% 53.1% 54.1% 61.8% 64.8% 64.8% 65.5% 86.1% [1] Source: Table B‐33 ‐ Good Status for Single Family Residential [2] Source: Table B‐9 ‐ Good Status for Commercial Retail [3] Source: Table B‐29 Good Status for Public and Private Schools [4] Source: Table B‐21 ‐ Good Status for Industrial Light [5] Source: Table B‐25 ‐ Good Status for Mobile Home
[6] Source: Tabl e B‐26 ‐ Good Status Construction Class and Quality for Multi‐Family Residential [7] Source: Table B‐33 ‐ Good Status for Single Family Residential [8] Source: Table B‐33 ‐ Good Status for Single Family Residential Source: Table C‐1 2012 CVFPP HEC‐FDA Structure and Damage Functions ‐ CVFPP Attachment 8F Flood Damage Analysis Percent of Structure Damaged
Prepared by LWA 1808000 LCMA ER Tables 2023.02.27.xlsx
38 ATTACHMENT E
Table 10
Levee Capital and Maintenance Assessment (LCMA)
Contents Replacement Value and Depth Damage
Land Use Structure to
Contents Ratio
D e p t h 0 123456789 1 0 1 1 1 2 1 3 1 4 1 5
Agricultural [1] 50% 6.6% 11.0% 15.1% 18.8% 22.1% 25.1% 27.7% 30.1% 32.1% 33.8% 35.2% 36.3% 37.2% 37.8% 38.2% 38.5% Commercial [2] 51% 0.0% 79.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% Industrial [4] 31% 0.2% 87.6% 96.4% 99.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% Mobile Home [5] 50% 0.0% 85.0% 95.0% 99.0% 99.0% 99.0% 99.0% 99.0% 99.0% 99.0% 99.0% 99.0% 99.0% 99.0% 99.0% 99.0% Multi‐Family Residential [6] 50% 6.6% 11.0% 15.1% 18.8% 22.1% 25.1% 27.7% 30.1% 32.1% 33.8% 35.2% 36.3% 37.2% 37.8% 38.2% 38.5% Open Space 0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Open Space ‐ Developed 0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Rural Residential [7] 50% 6.6% 11.0% 15.1% 18.8% 22.1% 25.1% 27.7% 30.1% 32.1% 33.8% 35.2% 36.3% 37.2% 37.8% 38.2% 38.5% Single‐Family Residential [8] 50% 6.6% 11.0% 15.1% 18.8% 22.1% 25.1% 27.7% 30.1% 32.1% 33.8% 35.2% 36.3% 37.2% 37.8% 38.2% 38.5% School [3] 38% 0.0% 87.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% [1] Source: Table B‐33 ‐ Good Status for Single Family Residential [2] Source: Table B‐9 ‐ Good Status for Commercial Retail [3] Source: Table B‐29 Good Status for Public and Private Schools [4] Source: Table B‐21 ‐ Good Status for Industrial Light [5] Source: Table B‐25 ‐ Good Status for Mobile Home
[6] Source: Tabl e B‐26 ‐ Good Status Construction Class and Quality for Multi‐Family Residential [7] Source: Table B‐33 ‐ Good Status for Single Family Residential [8] Source: Table B‐33 ‐ Good Status for Single Family Residential Source: Table C‐1 2012 CVFPP HEC‐FDA Structure and Damage Functions ‐ CVFPP Attachment 8F Flood Damage Analysis Percent of Contents Damaged
Prepared by LWA 1808000 LCMA ER Tables 2023.02.27.xlsx
39 ATTACHMENT E
Table 11
Levee Capital and Maintenance Assessment (LCMA)
Summary of Resulting Levee Benefit Units
Land Use Category
O&M Benefit
Units
(OBU)
Capital Benefit Units
(CBU)
Total Levee
Benefit Units
(LBU)
AB C  = A/30 + B
Agricultural 77,923,914 4,377,700 6,975,164
Blended 214,830,020 118,795,205 125,956,206
Commercial 4,003,482,162 456,928,315 590,377,720
Industrial 3,830,507,661 217,399,407 345,082,995
Mobile Home 21,631,953 3,114,756 3,835,821
Multi‐Family Residential 4,020,218,444 480,368,762 614,376,044 Open Space 16,772,254 2,029,262 2,588,337
Open Space ‐ Developed 50,095,586 7,698,085 9,367,938
Rural Residential 78,371,947 2,274,568 4,886,966
School 574,720,144 73,039,324 92,196,663
Single‐Family Residential 22,450,511,025 2,863,250,973 3,611,601,341 Total 35,339,065,110 4,229,276,358 5,407,245,195
Source: As calculated by Larsen Wurzel & Associates, inc.

Prepared by LWA 1808000 LCMA ER Tables 2023.02.27.xlsx
40 ATTACHMENT E

San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March 16, 2023

1808000 LCMA Preliminary Engineer's Report 2023 0316.docx 41 Relative Land Damage Rate per Acre
As defined under OBU methodology, the Relative Land Damage Rate per Acre represents the relative damage to site improvements (e.g. landscaping, utilities, etc.) that occurs as a result of inundation and deposition of sediment carried in floodwaters. The Relative Land Damage Rate per Acre was determined by assigning a Relative Land Value per Acre to each land use category and applying a 10% damage factor to the Relative Land Value per Acre. Table 8 (page 37) summarizes the Relative Land Damage Rate for each Land Use Category.

Structure Damage Rate
As defined under OBU methodology, the Structure Damage Rate is calculated based on the methodology used in the USACE Flood Damage Analysis (FDA) program. The FDA program assigns a relative Structure Replacement Value according to type of structure and estimates the percent structure damage based on the depth of flooding above the finish floor. Similarly, the FDA program assigns a relative Contents Replacement Value according to type of structure and estimates the percent of contents damage based on the depth of flooding (reference again, Table 9 & Table 10, pages 38 and 39 respectively). Table 11 (page 40) summarizes the CBU’s by Land Use Category.

Because an average structure size rate per acre was utilized for calculating structure damages, for the Capital Benefit unit calculations, structure sizes were capped at 5,000 square feet per parcel for single family residential. When calculating the flood depth to a finished floor, a finish floor height elevation was assumed at 1’ for all structures and 2’ for mobile homes.

SCAAD Factor
This factor is used to recognize the prior contribution of the SCAAD toward the implementation of the S CG Project. Those properties within the current SCAAD are given a SCAAD factor of 0.8 52 and those properties outside of the SC AAD assessment boundary are given a SCAAD factor of 1. The SCAAD factor of 0.852 was determined based on the ratio of the prior investments into the SCG Project by properties in the SCAAD, based on total annual assessment revenues provided to date, versus the investment required for the Levee Capital Services of this Proposed Assessment for the same benefitting parcels. When applied at 0.8 52, this factor reduces the special benefits received to account for the share of special benefits already delivered by properties in the SCAAD boundary to date and are now credited to the investment of funding for Levee Capital Services. For those properties within the SCAAD boundary (See Figure 6), the SCAAD factor is calculated as follows:
• SCAAD investment to date: approximately $17 Million
• SJAFCA 10.5% portion of LSJRP “first cost”, adjusted for updated SCG cost, escalated to 2022 cost basis: approximately $115 Million
• Discount factor = 17/115 = 14.78%
• SCAAD Factor = 1 – 0.148
• SCAAD Factor = 0.852
Equivalent Levee Benefit Unit (LBU)
Benefit units have been calculated based on individual levee breaches for O&M Services and weighted by representative levee lengths. However, a composite floodplain boundary was utilized to determine the

ATTACHMENT E
42 ATTACHMENT E

San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March 16, 2023

1808000 LCMA Preliminary Engineer's Report 2023 0316.docx 43 benefits from Capital Services because the capital project is considered a whole system of improvements. As a result of this approach, the total number of calculated OBU’s is significantly larger than the calculated CBU’s.

As such an equivalency factor is needed to allow for a comparable equivalent levee benefit unit for which to serve as a basis for assessing the total special benefits and determining parcel-level assessment rates. Because O&M Services represent an ongoing service that will continue int o the future and can considered on a single annual basis, and the Capital Services represent a shorter term but larger financed investment over time, the Assessment Engineer has considered the application of a factor related to the term of financing to equivocate the benefit units of the two services. The Assessment Engineer has utilized an equalization factor of 30:1, which is indicative of the capital financing term that is expected to be utilized for the Capital Services. To simply the application of the factor, and reduce the total number of calculated benefit units, the equalization factor is applied by dividing the OBU’s by 30 as follows:

Total Equivalent Levee Benefit Units = Total OBU / 30 + Total CBU Table 11 (page 40) summarizes the OBU’s, CBU’s and Total Levee Benefit Units (LBU’s) by Land Use Category.

General Benefits
Thoroughfare Damages Calculation
As described above, the Levee Capital and O&M Services provide a general benefit to the public at large by protecting thoroughfares within the boundary of the Proposed Assessment from flood damages. The amount of general benefit associated with each thoroughfare was quantified by identifying the cost to repair the road because of the flood damages. San Joaquin County indicated that the average cost to repair flood damages for an entire reach of thoroughfare is approximately $5.00 per square-foot.

Table 12 lists the reaches of thoroughfares protected against flood damages by the Levee Capital and O&M Services; identifies the cross-street limits, reach length, and typical road width.

Table 13 calculates the general benefit from protecting thoroughfares by multiplying the area of thoroughfare pavement by the estimated cost to repair flood damages . The general benefit from protectin g all thoroughfares was calculated to be 24,470,000 equivalent Levee Benefit Units.

Federal Properties
Federally owned properties, such as the United States Post Office in Stockton, receive a special benefit from the Levee Capital and O&M Services and are included in the apportionment of special benefit. The benefit for all federally owned properties is calculated as 458,523 equivalent Levee Benefit Units. However, federal law prohibits local agencies from collecting assessment s due from the federal government. The lost revenue cannot be reapportioned to assessed property owners. Therefore, the benefits of Levee Capital and O&M Services provided by protecting these federally owned properties against flood damages are treated similar to general benefits, and the lost assessment revenue must be funded by other revenue sources.

ATTACHMENT E
Table 12
Levee Capital and Maintenance Assessment (LCMA)
Protected Throughfares
Throughfare Reach  Description Reach Length
(ft) Width (ft) Total  SQFT
AB C  = A X B
HWY 99 Diverting  Canal to Carpenter Road 22,800 120 2,736,000 HWY 4  SJR River to I‐5 9,000 50 450,000
HWY 4  Main Street to HWY 99 8,200 120 984,000
Charter Way I‐5 to HWY 99 18,100 40 724,000
Total 4,894,000
Source: GIS Imagery
Prepared by LWA 1808000 LCMA ER Tables 2023.02.27.xlsx
44 ATTACHMENT E
Table 13
Levee Capital and Maintenance Assessment (LCMA)
Thoroughfare General Benefit Calculation
Thoroughfare SQFT Repair  Rate per SQFT Total General Benefit from Thoroughfares
AB C  = A X B
Reference Table 11 [1]
4,894,000 $5.00 24,470,000
[1] Based on input from San Joaquin County Public Works Prepared by LWA 1808000 LCMA ER Tables 2023.02.27.xlsx
45 ATTACHMENT E

San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March 16, 2023

1808000 LCMA Preliminary Engineer's Report 2023 0316.docx 46 Evaluation of Funding Sources for General Benefit
Together, the federal properties and thoroughfares amount to 24,928,523 units in general benefit. The total revenue required to fund the total general benefit is $40,834, using the special benefit assessment calculation found in the next section.
• Protecting thoroughfares: $40,074
• Special benefit to federally owned property: $750
Because other funding sources are provided for Levee Capital and O&M Services including from USACE and DWR, as well as San Joaquin County property tax apportionment revenues, this funding can be applied to the general benefits provided by the Services. I n short, these funding sources are sufficient to fund the general benefit occurring within the area.

Proposed Special Benefit Assessment Calculation
To determine the proposed assessment for an individual parcel, the amount of Levee Benefit Units (LBU) for the parcel is calculated and multiplied by the assessment rate per LBU. The proposed assessment rate per LBU is equal to the required annual budget divided by the total quantity of LBU ’s as shown on Table 14. All factors required to calculate each Parcel’s LBU have been described above and can found in the provided tables and appendices. The proposed assessment rate per LBU is $0.001415 / LBU.

Example Parcel Assessment
Using the proposed parcel assessment equation and supporting LBU equations as well as parcel attributes including parcel size, average structure size, relative land damage rate per acre, structure damage rate per square foot, and finally the proposed assessment rate, an individual parcel’s assessment can be calculated.

Assessments are rounded down to the closest multiple of $0.02 as required by the San Joaquin County Assessor’s office for submission of the special assessment roll for collection on County Property Tax Bills.

The following list of steps are taken to calculate a parcel’s assessment:

Step 1 – Determine the Parcel Size, Land Use, Breach Name, Representative Levee Length.

Step 2 – Using Table 7, determine the Average Structure Size.

Step 3 – Using Table 8, determine the Relative Land Damage Rate per Acre.

Step 4 – Using Table 9, determine the Structure Damage Rate per Square Foot.

Step 5 – Using Table 10, determine the Contents Damage Rate per Square Foot.

Step 6 – Calculate the Parcel OBU using Equation 1.

Step 7 – Calculate the Parcel CBU using Equation 2.

Step 8 – Determine if the parcel is within the previous SCAAD boundaries and add SCAAD Factor.

Step 9 – Calculate the Parcel LBU using Equation 3

ATTACHMENT E
Table 14
Levee Capital and Maintenance Assessment (LCMA)
Initial Proposed Assessment Rate Calculation ‐ FY 2023/24 FY 2023/24 Budget Total  Benefit Units Proposed FY 2023/24 Assessment Rate
AB C  = A /B
Reference Table 4 Reference  Tables 11 & 13
[1]
$7,684,000 5,431,715,195 $0.001415
[1] Includes benefit from thoroughfares and federal properties.

Prepared by LWA 1808000 LCMA ER Tables 2023.02.27.xlsx
47 ATTACHMENT E

San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March 16, 2023

1808000 LCMA Preliminary Engineer's Report 2023 0316.docx 48 Step 10 – Calculate the parcel assessment using Equation 3.

Step 11 – Round down to the closest multiple of $0.02. Raise up to $ 2.00 if it is less than th e minimum8
A detailed example parcel assessment calculation is included at the end of this report on Table 16 (Page 55).

Summary of Assessments
A detailed listing by Assessor’s parcel number of the assessments is included in Appendix F. The proposed assessments are summarized by Land Use Category in Table 15.

Special Considerations
Public Parcels
Consistent with the requirements of Proposition 218, all publicly owned parcels are assessed proportionately based upon the special benefits they receive from services provided by the proposed assessment. That is, public parcels are treated the same as pr ivately owned parcels for assessment calculation purposes. To calculate assessments for these parcels, a land use category was assigned to each public parcel based on its current use.

As noted previously, the benefits received by Federally owned parcels are treated the same a general benefits.

Because the assessments will not be collected from Federally owned parcels, the lost revenues from must be funded from an alternate sources similar to other general benefits.

Multiple Use Parcels
A property that is determined to have multiple uses but is classified under a single use code by the San Joaquin County Assessor that is not consistent with the multiple uses may be eligible to have its assessment calculated as if it were two or more parcels (“sub-parcels”) with varying structure and land uses types for the purpose of apportioning benefit. The assessments of the sub -parcels would then be combined to represent a single assessment for the purpose of assessment balloting, direct billing and/or submission of the roll to the San Joaquin County Auditor for collection on the secured property tax roll.

Minimum Assessment Amount
The Agency has determined that the collection of very small annual assessments can result in a net loss to the Agency due to the costs of pr ocessing. It light of the legal obligation to ensure that property owners pay assessments in proportion to the special benefit they receive, the Agency has determined that waiving those very small assessments is not legally permissible. The Agency has th erefore set a minimum assessment at $2.00. The minimum annual assessment will be $2.00 per parcel to reflect the cost to administer the Assessment Roll. All annual assessments calculated to be less than $2.00 will be raised to the $2.00 minimum.

If the a dditional revenue collected by the SJAFCA due to the minimum assessment exceeds the cost to administer the Assessment Roll, the funds will be added to the reserve fund for the LCMA’s Services.

8 Reference Minimum Assessment Amount discussion below.

ATTACHMENT E
Table 15
Levee Capital and Maintenance Assessment (LCMA)
Land Use Category Parcel Count Average
Assessment
Proposed FY 2023/24
Assessment
Share of Total
Assessment
[1]
Agricultural 767 $14 $10,618 0.1%
Blended 40 $4,455 $178,193 2.3%
Commercial 3,378 $247 $835,681 10.9%
Industrial 944 $517 $488,452 6.4%
Mobile Home 143 $38 $5,479 0.1%
Multi‐Family Residential 5,904 $147 $870,219 11.3%
Open Space 2,575 $3 $7,673 0.1%
Open Space ‐ Developed 3,432 $5 $16,516 0.2%
Rural Residential 1,071 $8 $8,255 0.1%
School 166 $786 $130,484 1.7%
Single‐Family Residential 75,741 $68 $5,132,808 66.8%
Total 94,161 $82 $7,684,376 100.0%
Summary of Proposed FY 2023/24 Assessments by Land Use Category [1] Includes $2 minimum assessment.

Prepared by LWA 1808000 LCMA ER Tables 2023.02.27.xlsx
49 ATTACHMENT E

San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March 16, 2023

1808000 LCMA Preliminary Engineer's Report 2023 0316.docx 50 Application of the Assessment Boundary to Parcels
The Assessment Boundary described above represents a boundary driven by the hydraulics associated with flooding. The hydraulic floodplain does not align with the parcel boundaries as they are configured, assessed, and taxed by the County. The Assessment Engineer has determined that those parcels with 95% of their land area located within the Assessment Boundary will be subject to the Assessment. While the hydraulics are not expected to change significantly over time, parcel boundaries can and do change regularly. As a result, the area subject to the collection of the assessment will not align with the boundary of the assessment. The application of the Assessment Boundary to the then current set of parcels will take place annually as part of the assessment administration process.

Updating the Annual Assessment Roll
Recalculating individual property assessments will accommodate changes within LCMA over time. These changes can result from the development activity such as recordation of subdivision maps, zoning changes, conditional use permits, and lot splits or mergers. Placement of a structure on an undeveloped parcel or other changes to improvements on a parcel may trigger a recalculation of the assessment if there is a change in the land use category.

It is recognized that when compiling data for the tens of thousands of parcels within the assessment boundary, the data9 used to derive individ ual parcel characteristics may not be accurate and may not precisely fit the intent of the Assessment Engineer thus leading to errors and/or circumstances that result in inaccurate assessment calculations on annual basis. Where such circumstances are disc overed, either by the persons administering the assessment district or by the owners of the properties affected, SJAFCA staff shall review such circumstances and determine if corrections or adjustments are appropriate. Any such corrections or adjustments are to be consistent with the concept, intent, and parameters of the methodology for the assessment as set forth within this Engineer’s Report without formal approval by the SJAFCA Executive Director. Unless such proposed changes are appealed to the SJAFCA Executive Director and determined not to be acceptable, they will be incorporated into the Assessment Roll.

9 The Assessment Engineer has utilized data compiled from the San Joaquin County Assessor to determine the individual property characteristics used as the basis for assessing and apportioning special benefit. While the data from the San Joaqu in County Assessor is assumed to be accurate, its primary purpose is for use by the San Joaquin County Assessor and is subject to the Assessor’s standards for accuracy and update. As a result, the information may be inaccurate and not reflect the actual property characteristics of every parcel.

ATTACHMENT E

San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March 16, 2023

1808000 LCMA Preliminary Engineer's Report 2023 0316.docx 51

6. ASSESSMENT ADMINISTRATION
Schedule for Collection
If property owners approve the proposed assessment, SJAFCA intends to commence collection of the assessments in FY 2023/24. The assessment would be collected annually on the secured property tax rolls of San Joaquin County as described further below under “Duration of the Assessment” (Page 52).

The annual administrative expenses of LCMA would also be funded through the annual levy of assessments.

Ongoing administrative expenses would include the annual calculation and preparation of the assessment roll, the actual costs of collecting the annual assessments and the costs of responding to inquiries including the review and processing of any appeals.

Assessment Revenue Distribution
Assessment revenues are collected for O&M Services and Capital Services. Since SJAFCA is not a maintaining organization, SJAFCA will transfer revenues to local maintaining agencies or fund others (i.e. contract for services) for levee O&M Services.

SJAFCA will transfer funding for the O&M of the SJCFCWCD levees to SJCFCWCD, except for the cost incurred by SJAFCA for the administration of the assessment . SJAFCA and SJCFCWCD will arrange an agreement for funding transfers if the Proposed Assessment is approved.

SJAFCA will transfer funding for the additional O&M services associated with the LSJRP to the appropriate maintaining agency or contract with others for these services. Transfer of funds for additional O&M associated with the LSJRP will occur as particular capital improvement features are finished and turned over by USACE to the NFS for long -term maintenance. If the Proposed Assessment is approved, SJAFCA will setup agreements with applicable maintainers that detail out the responsibilities and funding transfer amounts.

Appeals of Assessments Levied to Property
Any property owner who believes his or her property should be reclassified and the assessment adjusted may file a written appeal with the S JAFCA Executive Director . Any such appeal is limited to correction of an assessment during the then-current fiscal year and future years.

All appeals must include a statement of reasons why the property should be reclassified and may include supporting evidence. On the filing of any such appeal, the Executive Director will direct staff to promptly review the appeal and any information provided by the property owner and may investigate and assemble additional evidence necessary to evaluate the appeal. If the Executive Director finds that the assessment should be modified, the appropriate changes will be made to the assessment roll for the following fiscal year.

Any such changes approved after the assessment roll has been filed with the County for collection, will not result in a refund of the current or any prior year’s assessments paid before the appeal was filed unless so directed by the Executive Director.

ATTACHMENT E

San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March 16, 2023

1808000 LCMA Preliminary Engineer's Report 2023 0316.docx 52 Impact of Appeals
The majority of the data being used to generate the assessment rates for specific parcels comes from the San Joaquin County Assessor. Because the main purpose of the Assessor in compiling this data is not to support this and other Special Benefit Assessment efforts but rather to determine Assessed Value for the purpose of administering the County’s Secured Tax Roll, the Assessment Engineer has worked to refine the Assessor’s data so it properly reflects the conditions present in the physical benefit area. However, throughout the formation period (and indeed even after the formation of the assessment), data errors and discrepancies with the San Joaquin County Assessor data may surface and require modification of the assessment calculation for various parcels. Changes in the data without a corresponding change in the Assessment Rate established by this report will, by definition, change the total amount of assessments levied and collected in any one year.

For example, if the data assumes the existence of a house that has since been destroyed and not been reconstructed, once the database is corrected the rates will generate a smaller total assessment. On the other hand, if the data assumes an empty lot where a house has since been constructed, once the database is corrected the rates will generate a larger total assessment. Due to the database being constant ly refined (either through internal review or an external appeal process), it is infeasible to fine -tune the rates between the Preliminary Engineer’s Report and the Final Engineer’s Report. In addition, because changes to the database will either increase or decrease the total amount assessed, it is presumed that these amounts will roughly offset each other. Therefore, although minor changes to the database will continue to be made during the formation period, the rates proposed in this Report are not being fine-tuned, even though that will result in a total assessment which may be slightly less than or slightly more than the amount determined for the development of this report.

Duration of the Assessment
If approved by property owners in an assessment ballot proceeding conducted pursuant to Article XIIID Section 4 of the State Constitution and Government Code § 53750, et. seq., and subsequently approved by the SJAFCA Board of Directors, the assessment can be levied annually commencing FY 2023/24. The Executive Director will establish the assessment rate each year and while the assessment is only effective for that year, the assessment may be continued each year without another ballot proceeding with approv al of the SJAFCA Board of Directors. The annual budget for Levee Capital Services will be collected by SJAFCA for 30 years following a final bond issuance which is expected in 2038. The budget for Levee O&M services will be collected each year that Levee O&M Services are provided, which is expected to be in perpetuity. On -going annual assessments cannot be increased without property owner approval, except for the annual escalation as described below.

Annual Escalation of the Assessments
To ensure that SJAFCA can provide the needed services over time, it is important to allow for an increase of the assessment over time to address the rising costs of labor, supplies, and materials. The Assessment Engineer has determined that an appropriate escalation factor is a factor that is reflective of rising labor costs and goods over time. Therefore, beginning in FY 202 4/25, the maximum authorized assessment may be increased subject to an annual inflationary escalator pursuant to Government Code § 53739 (b), based on the annual change in the Consumer Price Index February to February CPI -W for San Francisco-Oakland-Hayward all Items, with Base Period 1982 -84 = 100, published by the U.S. Department of Labor, Bureau of Labor

ATTACHMENT E

San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March 16, 2023

1808000 LCMA Preliminary Engineer's Report 2023 0316.docx 53 Statistics, subject to a minimum of ze ro percent and a maximum of 4% in any given year . The adjustment to the maximum authorized assessment would be applied to the prior year’s annual assessment rate.

ATTACHMENT E

San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March 16, 2023

1808000 LCMA Preliminary Engineer's Report 2023 0316.docx 54

7. CONCLUSIONS
It is concluded that the proposed assessments do not exceed the reasonable cos t of the proportional special benefit conferred on each property assessed.

____________________________________
Scott L. Brown, P.E.

ATTACHMENT E

San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March 16, 2023

1808000 LCMA Preliminary Engineer's Report 2023 0316.docx 55 Table 16
Assessment Parcel Equations and Example Calculations
Equation 1: Levee O&M Benefit Units
𝑇𝑜𝑡𝑎𝑙 𝑂𝐵𝑈 = 𝑂𝐵𝑈 𝑝𝑒𝑟 𝑏𝑟𝑒𝑎𝑐ℎ 𝑓𝑜𝑟 𝑎𝑙𝑙 𝑏𝑟𝑒𝑎𝑐ℎ𝑒𝑠 𝑡ℎ𝑎𝑡 𝑎𝑓𝑓𝑒𝑐𝑡 𝑡ℎ𝑒 𝑝𝑎𝑟𝑐𝑒𝑙 𝐎𝐁𝐔 𝑝𝑒𝑟 𝑏𝑟𝑒𝑎𝑐ℎ = 𝑅𝑒𝑝𝑟𝑒𝑠𝑒𝑛𝑡𝑎𝑡𝑖𝑣𝑒 𝐿𝑒𝑣𝑒𝑒 𝐿𝑒𝑛𝑔𝑡ℎ [1] × {(𝑃𝑎𝑟𝑐𝑒𝑙 𝑆𝑖𝑧𝑒 [2] × 𝑅𝑒𝑙𝑎𝑡𝑖𝑣𝑒 𝐿𝑎𝑛𝑑 𝐷𝑎𝑚𝑎𝑔𝑒 𝑃𝑒𝑟 𝐴𝑐𝑟𝑒 [3]) + (𝐴𝑣𝑒𝑟𝑎𝑔𝑒 𝑆𝑡𝑟𝑢𝑐𝑡𝑢𝑟𝑒 𝑆𝑞. 𝐹𝑡. 𝑝𝑒𝑟 𝑎𝑐𝑟𝑒 [4] × 𝑃𝑎𝑟𝑐𝑒𝑙 𝑆𝑖𝑧𝑒 [2] × 𝑆𝑡𝑟𝑢𝑐𝑡𝑢𝑟𝑒 𝑅𝑒𝑝𝑙𝑎𝑐𝑒𝑚𝑒𝑛𝑡 𝑉𝑎𝑙𝑢𝑒 [5] × (𝑆𝑡𝑟𝑢𝑐𝑡𝑢𝑟𝑒 𝐷𝑒𝑝𝑡ℎ 𝐷𝑎𝑚𝑎𝑔𝑒 [5] + 𝑆𝑡𝑟𝑢𝑐𝑡𝑢𝑟𝑒 𝑡𝑜 𝐶𝑜𝑛𝑡𝑒𝑛𝑡𝑠 𝑅𝑎𝑡𝑖𝑜 [6] × 𝐶𝑜𝑛𝑡𝑒𝑛𝑡𝑠 𝐷𝑒𝑝𝑡ℎ 𝐷𝑎𝑚𝑎𝑔𝑒 [6]))}

[1] Table 5; Parcels within the LCMA O&M Boundary without flood depths utilized a levee length of 1,000 and only receive land damage benefit. [2] Assessor’s Data
[3] Table 8
[4] Table 7
[5] Table 9
[6] Table 10

Equation 2: Capital Benefit Units
𝐂𝐁𝐔 = {(𝑃𝑎𝑟𝑐𝑒𝑙 𝑆𝑖𝑧𝑒 [2] × 𝑅𝑒𝑙𝑎𝑡𝑖𝑣𝑒 𝐿𝑎𝑛𝑑 𝐷𝑎𝑚𝑎𝑔𝑒 𝑃𝑒𝑟 𝐴𝑐𝑟𝑒 [3]) + (𝐴𝑣𝑒𝑟𝑎𝑔𝑒 𝑆𝑡𝑟𝑢𝑐𝑡𝑢𝑟𝑒 𝑆𝑖𝑧𝑒 𝑝𝑒𝑟 𝑎𝑐𝑟𝑒 [4] × 𝑃𝑎𝑟𝑐𝑒𝑙 𝑆𝑖𝑧𝑒 [2] × 𝑆𝑡𝑟𝑢𝑐𝑡𝑢𝑟𝑒𝑅𝑒𝑝𝑙𝑎𝑐𝑒𝑚𝑒𝑛𝑡 𝑉𝑎𝑙𝑢𝑒 [5] × ( 𝑆𝑡𝑟𝑢𝑐𝑡𝑢𝑟𝑒 𝐷𝑒𝑝𝑡ℎ 𝐷𝑎𝑚𝑎𝑔𝑒 [5] + 𝑆𝑡𝑟𝑢𝑐𝑡𝑢𝑟𝑒 𝑡𝑜 𝐶𝑜𝑛𝑡𝑒𝑛𝑡𝑠 𝑅𝑎𝑡𝑖𝑜 [6] × 𝐶𝑜𝑛𝑡𝑒𝑛𝑡𝑠 𝐷𝑒𝑝𝑡ℎ 𝐷𝑎𝑚𝑎𝑔𝑒 [6]))} X SCAAD Factor [7]
[2] Assessor’s Data
[3] Table 8
[4] Table 7
[5] Table 9
[6] Table 10
[7] Based on parcel location; see Figure 6.

Equation 3: Proposed Parcel Assessment
𝑃𝑎𝑟𝑐𝑒𝑙 𝐿𝐵𝑈 = 𝑂𝐵𝑈
30 + 𝐶𝐵𝑈
𝐂𝐚𝐥𝐜𝐮𝐥𝐚𝐭𝐞𝐝 𝐏𝐚𝐫𝐜𝐞𝐥 𝐀𝐬𝐬𝐞𝐬𝐬𝐦𝐞𝐧𝐭 = 𝑷𝒂𝒓𝒄𝒆𝒍 𝑳𝑩𝑼 × 𝑨𝒔𝒔𝒆𝒔𝒔𝒎𝒆𝒏𝒕 𝑹𝒂𝒕𝒆 𝒑𝒆𝒓 𝑳𝑩𝑼 [𝟖] [8] Table 14; 𝐀𝐬𝐬𝐞𝐬𝐬𝐦𝐞𝐧𝐭 𝐑𝐚𝐭𝐞 𝐩𝐞𝐫 L𝐁𝐔 = $0.001415

ATTACHMENT E

San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March 16, 2023

1808000 LCMA Preliminary Engineer's Report 2023 0316.docx 56 Example Assessment Calculations
The following examples illustrate the application of the assessment equation to determine the annual assessment for several hypothetical properties.

Example 1
Consider a 0.16-acre single-family residential property the following property characteristics.

O&M Breach Depth (ft)
Csr L3 8
Csr R1 1
OBU Calculation
Land Use Category – Single-Family
From Table 5, Representative Levee Length: Csr L3- 2.6353 miles and Csr R1- 2.4215 miles From Table 7, Average Structure Sq. Ft. – 9,000 sq ft per acre From Table 8, the Relative Damage per Acre - $5,000 per acre From Table 9 and Table 10, the Structure Replacement Value - $111.67 per square foot; Structure Depth Damage 58.00% for 8 ft and 19.25% for 1 ft; Structure to Contents Ratio of 50.00%; Contents Depth Damage of 32.05% for 8ft and 11.00% for 1 ft
𝑶𝑩𝑼 (𝑪𝒔𝒓 𝑳𝟑) = 2.6353 𝑚𝑖𝑙𝑒𝑠 𝑥 {(0.16 𝑎𝑐𝑟𝑒𝑠 𝑥 $5,000 𝑝𝑒𝑟 𝑎𝑐𝑟𝑒) + (9,000 𝑠𝑞 𝑓𝑡 𝑝𝑒𝑟 𝑎𝑐𝑟𝑒 𝑥 0.16 𝑎𝑐𝑟𝑒𝑠 𝑥 $111.67 𝑥 (58.00% + 50% 𝑋 32.05%)} = 315,817
𝑶𝑩𝑼 (𝑪𝒔𝒓 𝑹𝟏) = 2.4215 𝑚𝑖𝑙𝑒𝑠 𝑥 {(0.16 𝑎𝑐𝑟𝑒𝑠 𝑥 $5,000 𝑝𝑒𝑟 𝑎𝑐𝑟𝑒) + 9,000 𝑠𝑞 𝑓𝑡 𝑝𝑒𝑟 𝑎𝑐𝑟𝑒 𝑥 0.16 𝑎𝑐𝑟𝑒𝑠 𝑥 $111.67 𝑥 (19.25% + 50% 𝑋 11.00%) } = 98,309
Total OBU = 315,817 + 98,309 = 414,126
CBU Calculation
From Table 7, Average Structure Size – 9,000 sq ft per acre From Table 8, the Relative Damage per Acre - $5,000 per acre From Table 9 and Table 10, the Structure Replacement Value - $111.67 per square foot; Structure Depth Damage for 6 ft (5ft with finished floor) – 44.70%; Structure to Contents Ratio of 50.00%; Contents Depth Damage of 25.05% for 6 ft (5ft with finished floor) SCAAD Factor of 1
Capital Depth (ft)
100-Year 6

ATTACHMENT E

San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March 16, 2023

1808000 LCMA Preliminary Engineer's Report 2023 0316.docx 57 𝑪𝑩𝑼 = {(0.16 𝑎𝑐𝑟𝑒𝑠 𝑥 $5,000 𝑝𝑒𝑟 𝑎𝑐𝑟𝑒)
+ (9,000 𝑠𝑞 𝑓𝑡 𝑝𝑒𝑟 𝑎𝑐𝑟𝑒 𝑥 0.16 𝑎𝑐𝑟𝑒𝑠 𝑥 $111.67 𝑥 (44.7% + 50% 𝑥 25.05%)} 𝑥 1 = 92,820
Total LBU = 414,126/30 + 92,820 = 106,624
Assessment Calculation
𝑪𝒂𝒍𝒄𝒖𝒍𝒂𝒕𝒆𝒅 𝑷𝒂𝒓𝒄𝒆𝒍 𝑨𝒔𝒔𝒆𝒔𝒔𝒎𝒆𝒏𝒕 = (106,624 𝑥 0.001415) = 150.84 [𝑷𝒓𝒐𝒑𝒐𝒔𝒆𝒅 𝑨𝒔𝒔𝒆𝒔𝒔𝒎𝒆𝒏𝒕] = $𝟏𝟓𝟎. 𝟖𝟒
Example 2
Assume a 1.5-acre commercial property the following property characteristics:

O&M Breach Depth (ft)
Brc L2 3
Brc L3 4
OBU Calculation
Land Use Category - Commercial
From Table 14, Representative Levee Length: Brc L2 – 2.7578 miles and Brc L3 – 0.9300 miles From Table 7, Average Structure Size - 8,800 sqft per acre From Table 8, the Relative Damage per Acre - $7,000 per acre From Table 9 and Table 10, the Structure Replacement Value - $85.56 per square foot; Structure Depth Damage 31.20% for 3 ft and 32.40% for 4 ft; Structure to Contents Ratio of 51.00%; Contents Depth Damage of 82.20% for 3ft and 83.40% for 4 ft
𝑶𝑩𝑼 (𝑩𝒓𝒄 𝑳𝟐) = 2.7578 𝑚𝑖𝑙𝑒𝑠 𝑥 {(1.50 𝑎𝑐𝑟𝑒𝑠 𝑥 $7,000 𝑝𝑒𝑟 𝑎𝑐𝑟𝑒) + (8,800 𝑠𝑞𝑓𝑡 𝑝𝑒𝑟 𝑎𝑐𝑟𝑒 𝑥 1.5 𝑎𝑐𝑟𝑒𝑠 𝑥 $85.56 𝑥 (31.20% + 51% 𝑥 82.20%)} = 2,589,156
𝑶𝑩𝑼 (𝑩𝒓𝒄 𝑳𝟑) = 0.9300 𝑚𝑖𝑙𝑒𝑠 𝑥 {(1.50 𝑎𝑐𝑟𝑒𝑠 𝑥 $7,000 𝑝𝑒𝑟 𝑎𝑐𝑟𝑒) + (8,800 𝑠𝑞𝑓𝑡 𝑝𝑒𝑟 𝑎𝑐𝑟𝑒 𝑥 1.50 𝑎𝑐𝑟𝑒𝑠 𝑥 $85.56 𝑥 (32.40% + 51% 𝑥 83.40%)} = 885,672
Total OBU = 2,589,156+ 885,672 = 3,474,828
CBU Calculation
From Table 7, Average Structure Size - 8,800 sqft per acre Capital Depth (ft)
100-Year 6

ATTACHMENT E

San Joaquin Area Flood Control Agency
Levee Construction and Maintenance Assessment
Preliminary Engineer’s Report
March 16, 2023

1808000 LCMA Preliminary Engineer's Report 2023 0316.docx 58 From Table 8, the Relative Damage per Acre - $7,000 per acre From Table 9 and Table 10, the Structure Replacement Value - $85.56 per square foot; Structure Depth Da mage for 6 ft (5ft with finished floor) – 32.40%; Structure to Contents Ratio of 51.00%; Contents Depth Damage of 83.40% for 6 ft (5ft with finished floor ) SCAAD Factor of 1
𝑪𝑩𝑼 = {(1.5 𝑎𝑐𝑟𝑒𝑠 𝑥 $7,000 𝑝𝑒𝑟 𝑎𝑐𝑟𝑒)
+ (8,800 𝑠𝑞𝑓𝑡 𝑝𝑒𝑟 𝑎𝑐𝑟𝑒 𝑥 1.50 𝑎𝑐𝑟𝑒𝑠 𝑥 $85.56 𝑥 (32.40% + 51% 𝑥 83.40%))} 𝑥 1 = 952,413
Total LBU = 3,474,828/30 + 952,413 = 1,068,241
Assessment Calculation
𝑪𝒂𝒍𝒄𝒖𝒍𝒂𝒕𝒆𝒅 𝑷𝒓𝒐𝒑𝒐𝒔𝒆𝒅 𝑨𝒔𝒔𝒆𝒔𝒔𝒎𝒆𝒏𝒕 = (1,068,241 𝑥 0.001415) = 1,511.19 [𝑷𝒓𝒐𝒑𝒐𝒔𝒆𝒅 𝑨𝒔𝒔𝒆𝒔𝒔𝒎𝒆𝒏𝒕] = $𝟏, 𝟓𝟏𝟏. 𝟏𝟗

ATTACHMENT E

San Joaquin Area
Flood Control Agency

Levee Construction and
Maintenance Assessment
(LCMA)

Appendix A

KSN, Technical Memorandum,
LCMA, Incremental O&M Costs LSJRP,
February 23, 2023

San Joaquin Area Flood Control Agency
Date: March 16, 2023

ATTACHMENT E

2494-0010
08-300

TECHNICAL MEMORANDUM
March 7, 2023
Revision 1
Project: Levee Construction and Maintenance Assessment District Subject: Incremental Operations and Maintenance Costs
Lower San Joaquin River Project
Prepared by: Erik E. Almaas, PE
Reviewed by: Christopher H. Neudeck, PE

1. Introduction
The San Joaquin County Flood Control and Water Conservation District (SJCFCWCD) and the San Joaquin Flood Control Agency (SJAFCA) are currently planning the Levee Construction and Maintenance Assessment (LCMA) District. The proposed assessment would provide funding for the following:
 Current budget deficiencies for operations and maintenance (O&M) of the existing Federal levee and channel facilities under the jurisdiction of SJCFCWCD within Zone 9.  Local cost share for the capital costs for the Lower San Joaquin River Project (LSJRP).  Incremental O&M costs resulting from the implementation of the LSJRP.

The evaluation of funding requirements for the first two components listed above is currently underway by Larsen Wurzel & Associates, Inc. (LWA). Kjeldsen, Sinnock & Neudeck, Inc. (KSN) has been requested to evaluate the third component listed above. This technical memorandum summarizes this evaluation and provides a summary of the results of the incremental O&M costs resulting from the implementation of the LSJRP.

2. Data Sources
The existing data sources that were utilized in this evaluation are as follows:
 U.S. Army Corps of Engineers (USACE). San Joaquin River Basin, Lower San Joaquin River, CA, Final Integrated Interim Feasibility Report. January 2018. (USACE Report)  State of California, Department of Water Resources (DWR). Flood System Long-Term Operations, Maintenance, Repair, Rehabilitation, and Replacement Cost Evaluation , Central Valley Flood Protection Plan, 2017 Update. January 2017. (DWR Report)

3. Project Understanding and Assumptions
For the purposes of estimating incremental O&M costs associated with the LSJRP, the Recommended Plan (i.e., Alternative 7A) within the USACE Report was used as a basis for evaluation. The LSJRP consists of 20.4 miles of existing levees to be rehabilitated and 2.0 miles of new levees. A map of the proposed remediation measures and levee reach names used in this evaluation are shown below in Figure 1.

ATTACHMENT E

TECHNICAL MEMORANDUM
March 7, 2023

Page 2 of 9 ends

Figure 1 - Proposed Remediation Measures

ATTACHMENT E

TECHNICAL MEMORANDUM
March 7, 2023

Page 3 of 9 ends

The proposed new flood control measures within the LSJRP include the following:
 New levee
 New closure structure
The proposed remediation measures for the existing levees within the LSJRP include the following:
 Seepage cutoff wall
 Levee reshaping
 Seismic fix
 Levee raising
 Erosion protection
Long-term levee subsidence mitigation was also considered in evaluating the O&M costs. For the purposes of this Technical Memorandum, the evaluation of O&M costs attributed to the new closure structures at Smith Canal and Fourteenmile Slough was not performed. A breakdown of the proposed remediation measures on a levee reach-by-reach basis is summarized below in Table 1. A more detailed breakdown in included in Exhibit 1.

Table 1 - Summary of Proposed Remediation Measures
Proposed Remediation Measure (1)
Levee
Reach
New
Levee
Seepage
Cutoff
Wall
Levee
Reshaping
Seismic
Fix
Levee
Raising
Erosion
Protection
Subsidence
Mitigation
Levee
Length
(miles)
Mosher Slough (left bank) 1.96
MC_10_L x x x 1.22
MC_20_L x x x 0.74
Shima Tract (right bank) 1.25
ST_10_R x x x 0.47
ST_20_R x x x 0.78
Fivemile Slough (right bank) 0.31
FS_10_R x x x 0.31
Fourteenmile Slough (left bank) 1.89
FM_60_L x x x x 0.31
FM_40_L x x x x 0.27
FM_30_L x x x x 1.31
Tenmile Slough (left bank) 2.08
TS_30_L x x x x 1.14
TS_20_L x x x x 0.27
TS_10_L x x x 0.68
Calaveras River (right bank) 4.29
CR_10_R x x 0.42
CR_20_R x x 0.26
CR_30_R x x 0.71
CR_40_R x x 0.54
CR_50_R x x 1.22
CR_60_R x x 0.25
CR_70_R x x 0.30
CR_80_R x x 0.59

ATTACHMENT E

TECHNICAL MEMORANDUM
March 7, 2023

Page 4 of 9 ends

Proposed Remediation Measure (1)
Levee
Reach
New
Levee
Seepage
Cutoff
Wall
Levee
Reshaping
Seismic
Fix
Levee
Raising
Erosion
Protection
Subsidence
Mitigation
Levee
Length
(miles)
Calaveras River (left bank) 4.09
CR_10_L x x 0.33
CR_20_L x x 0.90
CR_30_L x x 0.49
CR_40_L x x x 1.20
CR_50_L x x 0.32
CR_60_L x x 0.27
CR_70_L x x 0.58
San Joaquin River (right bank) 3.90
SJR_10_R x x x 0.53
SJR_20_R x x x 0.42
SJR_30_R x x x 0.65
SJR_40_R x x 0.79
SJR_50_R x x 0.33
SJR_60_R x x 0.43
SJR_70_R x x 0.75
French Camp Slough (right bank) 1.84
FCS_10_R x x 1.84
Duck Creek (right bank) 0.84
DC_10_R x x 0.15
DC_20_R x x x 0.43
DC_30_R x x x 0.27
Totals: 2.01 21.51 3.94 0.94 3.48 4.86 22.45 22.45
Notes:
(1) The evaluation of O&M costs attributed to the new closure structures at Smith Canal and Fourteenmile Slough is not included in this summary.

It should be noted that the project understanding and basis of evaluation as described above are based on the LSJRP as is currently authorized by USACE. However, as the planning and engineering processes advance, further refinement of the LSJRP elements and final design configurations may differ from what is shown in the Recommended Plan within the USACE Report. For the purpose of estimating incremental O&M costs, it has been assumed that future design refinements would likely result in reduced O&M as compared to the authorized LSJRP. Therefore, the basis of estimating incremental O&M costs described in this technical memorandum has been determined to be an appropriate, conservative approach.

A list of the major assumptions utilized in this evaluation are summarized below in Table 2.

ATTACHMENT E

TECHNICAL MEMORANDUM
March 7, 2023

Page 5 of 9 ends

Table 2 - Major Assumptions
Proposed
Measure Reference Assumption
New levee DWR Report
(Table 5.1)
 For an urban levee on the Lower San Joaquin River / Delta South, the operations and maintenance costs are $50,000 per levee mile, and the repair, replace, and rehabilitate costs are $18,000 per levee mile in 2017$.

Seepage
cutoff wall
USACE Report
(Section 8.1.3)
 “ Cutoff wall(s) will not change long-term maintenance or replacement costs.”
Levee
reshaping
USACE Report
(Section 8.1.3)
 “ Right-of-way will be increased; so maintenance costs will increase to cover a larger vegetation management footprint.”  Modifying the existing levee geometry, such as widening the levee crown and flattening the levee slopes to increase stability, will increase the vegetation management footprint.

Seismic fix USACE Report
(Section 8.1.3)
 “ Right-of-way will be increased; so maintenance costs will increase to cover a larger vegetation management footprint.”  Degrading a portion of the existing levee, constructing a grid of deep soil mixing columns, and constructing a stability berm at the landside levee toe will increase the vegetation management footprint.

Levee
raising
USACE Report
(Section 8.1.3)
 “ Right-of-way will be increased; so maintenance costs will increase to cover a larger vegetation management footprint.”  Extending the landside levee toe landward to support raising the levee crown will increase the vegetation management footprint.

Erosion
protection
n/a  Furnish and place 25 tons of supplemental RSP per levee mile per year.

Subsidence
mitigation
n/a  Furnish and place engineered levee fill and aggregate base on the levee crown periodically to maintain the minimum top of levee elevation over time.

Where necessary, costs have been escalated to 2023 dollars based on the Construction Cost Index (CCI) published monthly by Engineering News-Record (ENR). The CCI is an indicator of general construction costs and includes labor and materials components. ENR uses the CCI to measure how much it costs to purchase a hypothetical package of goods and services and compare it to what it was in a prior year.

A breakdown of the present-day unit costs used in this evaluation is included in Exhibit 2.

4. Approach
The approach for each of the proposed measures is described below in further detail.

4.1 New Levees
Pursuant to Table 5.1 of the DWR Report for an urban levee on the Lower San Joaquin River / Delta South, the operations and maintenance costs are $50,000 per levee mile, and the repair, replace, and rehabilitate costs are $18,000 per levee mile. The combined amount of $68,000 was escalated to 2023 dollars based on ENR CCIs. The CCIs that were used in this assessment are summarized below in Table 3.

ATTACHMENT E

TECHNICAL MEMORANDUM
March 7, 2023

Page 6 of 9 ends

Table 3 - ENR CCIs and Escalation Factor for New Levee O&M Costs Comparison Data Current Data Escalation
Date ENR CCI Date ENR CCI Factor
January 2017 10,531.68 January 2023 13,175.03 1.2510
Therefore, the O&M cost attributed to a new levee in 2023 dollars was determined to be $85,067 per levee mile per year.

4.2 Seepage Cutoff Wall
Pursuant to Section 8.1.3 of the USACE Report, “Cutoff wall(s) will not change long-term maintenance or replacement costs.” Therefore, the incremental O&M cost attributed to seepage cutoff walls was determined to be zero.

4.3 Levee Reshaping, Seismic Fix, and Levee Raising
Levee reshaping, seismic fix, and levee raising remediation measures all include an element of widening the levee footprint in order to improve levee stability and/or the minimum top of levee.

Pursuant to Section 8.1.3 of the USACE Report, “Right-of-way will be increased; so maintenance costs will increase to cover a larger vegetation management footprint.” As a result, all three proposed remediation measures incorporate an increase in the levee vegetation management footprint.

Therefore, the following approach was developed to evaluate the incremental O&M costs associated with the increase to vegetation management for levee reshaping, seismic fix, and levee raising remediation measures:
 Establish a baseline annual cost attributed to only vegetation management.  Calculate a project footprint modifier that repr esents the percent increase in project footprint associated with the increased vegetation management.
 Calculate the incremental O&M costs associated with the increased vegetation management.

In order to establish a baseline annual cost attributed to only vegetation management, ten years of claims from the DWR Delta Levees Subventions Maintenance Program for the 28 reclamation districts in which KSN is the District Engineer were analyzed. The annual costs for “Levee Vegetation Control and Management” from Fiscal Year 2011-12 to Fiscal Year 2020-21 for each reclamation district was tallied and adjusted to 2023 dollars using ENR CCI values as per Table 4 below.

Table 4 - ENR CCIs and Escalation Factors for Baseline Vegetation O&M Costs Comparison Values Current Values Escalation
Date ENR CCI Date ENR CCI Factor
June 2011 9,290.00 January 2023 13,175.03 1.4182
June 2012 9,542.33 January 2023 13,175.03 1.3807
June 2013 9,800.38 January 2023 13,175.03 1.3443
June 2014 10,036.38 January 2023 13,175.03 1.3127
June 2015 10,337.05 January 2023 13,175.03 1.2745
June 2016 10,702.81 January 2023 13,175.03 1.2310
June 2017 11,068.35 January 2023 13,175.03 1.1903
June 2018 11,268.48 January 2023 13,175.03 1.1692
June 2019 11,436.23 January 2023 13,175.03 1.1520
June 2020 12,112.05 January 2023 13,175.03 1.0878

ATTACHMENT E

TECHNICAL MEMORANDUM
March 7, 2023

Page 7 of 9 ends

An average annual baseline cost attributed to only vegetation management was calculated to be $3,635 per levee mile. A breakdown of the annual costs per reclamation district for said ten-year period is included in Exhibit 3.

Assumptions were made regarding the increased levee footprint width associated with levee reshaping, seismic fix, and levee raise measures. Levee widths for both pre- and post-project conditions and project footprint modifiers are summarized below in Table 5, and the basis of footprint calculations is described in Exhibit 4.

Table 5 - Increase in Project Footprint Associated with Increased Vegetation Management Remediation Measure
Pre-Project Width
(feet)
Post-Project Width
(feet)
Project Footprint
Modifier
Levee reshaping 108 164 +51.9%
Seismic fix 148 221 +49.3%
Levee raising 130 154 +18.5%
The incremental O&M costs associated with increased vegetation management were calculated by multiplying the baseline vegetation management costs (i.e., $3,655 per levee mile per year) and the project footprint multipliers shown in Table 5. Therefore, the incremental O&M costs attributed to levee reshaping, seismic fix, and levee raising in 2023 dollars were calculated and are summarized below in Table 6.

Table 6 - Incremental O&M Costs Associated with Levee Reshaping, Seismic Fix, and Levee Raising Measures Remediation Measure
Incremental O&M Cost
(per levee mile per year)
Levee reshaping $1,885
Seismic fix $1,793
Levee raising $671

4.4 Erosion Protection
Erosion protection measures were assumed to include the placement of Rock Slope Protection (RSP) consisting of 18-inch minus quarry stone riprap on the levee slope. The incremental O&M costs associated with erosion protection were calculated based on furnishing and placing a standard truck load (i.e., 25 tons) of supplemental RSP per levee mile per year. Based on a unit cost of $159 per ton of RSP, the incremental O&M cost attributed to erosion protection in 2023 dollars was determined to be $3,985 per levee mile per year.

4.5 Subsidence Mitigation
Pursuant to Section 8.1.3 of the USACE Report, “Localized ground subsidence may require periodic placement of levee fill to maintain the levee crest elevation.” The approach for evaluating the incremental O&M costs associated with subsidence mitigation was developed assuming that new engineered levee fill and aggregate base will need to be furnished and placed on the levee crown periodically to maintain the minimum top of levee elevation over time. The assumptions used in the calculations of new materials are summarized below in Table 7.

ATTACHMENT E

TECHNICAL MEMORANDUM
March 7, 2023

Page 8 of 9 ends

Table 7 - New Materials Associated with Subsidence Mitigation Material
Width
(feet)
Thickness
(inches)
Quantity
(cubic yards per mile)
Frequency
(years)
Quantity
(tons per mile per year)
Engineered levee fill 20 6 1,956 50 70.4
Aggregate base 20 4 1,304 50 52.1
Based on a unit cost of $75 per ton of engineered levee fill and a unit cost of $90 per ton of aggregate base, the incremental O&M cost attributed to subsidence mitigation in 2023 dollars was determined to be $9,974 per levee mile per year.

5. Results
The incremental O&M unit costs associated with each of the proposed measures is summarized below in Table 8.

Table 8 - Summary of Incremental O&M Unit Costs
Remediation Measure
Incremental O&M Cost
(per levee mile per year)
New levee $85,067
Seepage cutoff wall $0
Levee reshaping $1,885
Seismic fix $1,793
Levee raising $671
Erosion protection $3,985
Subsidence mitigation $9,974
The overall incremental O&M annual cost was then calculated by multiplying the incremental O&M unit costs for each proposed measure by the levee miles for each levee reach. A breakdown of the overall incremental O&M annual cost on a levee reach-by-reach basis is summarized below in Table 9. A more detailed breakdown is included in Exhibit 5.

Table 9 - Summary of Overall Incremental O&M Annual Costs Levee Reach
Levee Length
(miles)
Incremental O&M
Annual Cost
Mosher Slough (left bank) $20,840
MC_10_L 1.22 $12,979
MC_20_L 0.74 $7,861
Shima Tract (right bank) $17,475
ST_10_R 0.47 $6,577
ST_20_R 0.78 $10,897
Fivemile Slough (right bank) $4,291
FS_10_R 0.31 $4,291
Fourteenmile Slough (left bank) $138,403
FM_60_L 0.31 $4,527
FM_40_L 0.27 $3,979
FM_30_L 1.31 $129,896

ATTACHMENT E

TECHNICAL MEMORANDUM
March 7, 2023

Page 9 of 9 ends

Levee Reach
Levee Length
(miles)
Incremental O&M
Annual Cost
Tenmile Slough (left bank) $31,973
TS_30_L 1.14 $18,016
TS_20_L 0.27 $4,737
TS_10_L 0.68 $9,220
Calaveras River (right bank) $42,783
CR_10_R 0.42 $4,175
CR_20_R 0.26 $2,618
CR_30_R 0.71 $7,038
CR_40_R 0.54 $5,434
CR_50_R 1.22 $12,135
CR_60_R 0.25 $2,539
CR_70_R 0.30 $3,000
CR_80_R 0.59 $5,844
Calaveras River (left bank) $43,072
CR_10_L 0.33 $3,279
CR_20_L 0.90 $8,993
CR_30_L 0.49 $4,870
CR_40_L 1.20 $14,289
CR_50_L 0.32 $3,149
CR_60_L 0.27 $2,731
CR_70_L 0.58 $5,761
San Joaquin River (right bank) $40,717
SJR_10_R 0.53 $5,595
SJR_20_R 0.42 $4,460
SJR_30_R 0.65 $7,699
SJR_40_R 0.79 $7,884
SJR_50_R 0.33 $3,332
SJR_60_R 0.43 $4,301
SJR_70_R 0.75 $7,446
French Camp Slough (right bank) $18,317
FCS_10_R 1.84 $18,317
Duck Creek (right bank) $67,470
DC_10_R 0.15 $1,500
DC_20_R 0.43 $40,680
DC_30_R 0.27 $25,290
Totals: 22.45 $425,340
Notes:
(1) The evaluation of O&M costs attributed to the new closure structures at Smith Canal and Fourteenmile Slough is not included in this summary.

6. Conclusions
The overall incremental O&M annual cost attributed to the LSJRP amounts to $425,402 per year, with one exception. For the purposes of this Technical Memorandum, the evaluation of O&M costs attributed to the new closure structures at Smith Canal and Fourteenmile Slough was not performed.

ATTACHMENT E

Levee Construction and Maintenance Assessment District
Incremental Operations and Maintenance Costs
Lower San Joaquin River Project

EXHIBIT 1
Proposed Remediation Measures

ATTACHMENT E
LCMA District
Incremental Operations and Maintenance Costs
Lower San Joaquin River Project

PROPOSED REMEDIATION MEASURES
Levee Type Proposed Remediation Measure
Levee
Reach Waterway Bank Reach Description
Current
LMA(1)
Federal
Levee
Non-Fed to
Become
Fed
New Levee
to Become
Fed Levee
New
Levee
Seepage
Cutoff
Wall
Levee
Reshaping
Seismic
Fix
Levee
Raising
Erosion
Protection
New
Closure
Structure
Subsidence
Mitigation
Length
(miles)
MC_10_L Mosher Slough Left Southern levee along Mosher Slough with heavy amounts of vegatation, neighboring residential area. SJCFCWCD(2) X X X X 1.22 MC_20_L Mosher Slough Left Southern levee along Mosher Slough with heavy amounts of ve
gatation, neighboring residential area. SJCFCWCD X X X X 0.74 ST_10_R Shima Tract Right Dry land levee along east end of Shima Tract between a
gricultural land (west) and a residential area (east). SJCFCWCD X X X X 0.47 ST_20_R Shima Tract Right Dry land levee along east end of Shima Tract between a
gricultural land (west) and a residential area (east). SJCFCWCD X X X X 0.78 FS_10_R Fivemile Slough Right
Northern levee along Fivemile Slough along south end
of Shima Tract with minimal amounts of vegatation,
nei
ghboring agricultural area.

RD 2115
Shima Tract X X X X 0.31
FM_60_L Fourteenmile Slough Right North levee along Fourteenmile Slough along south end of Shima Tract.

RD 2115
Shima Tract XX X X X 0 . 3 1
FM_50_L Fourteenmile Slough Left Fourteen Mile Slough Closure Structure n/a X (3) 0.00
FM_40_L Fourteenmile Slough Left
Levee with future plan of implementing Fourteen Mile
Slough Closure Structure. Levee will be implemented
inland on Wri
ght-Elmwood Tract.
n/a X X X X X 0.27
FM_30_L Fourteenmile Slough Left
Western levee along Fourteenmile Slough along the
east end of Wright-Elmwood Tract. Village West
Marina Resort East of Fourteenmile Slou
gh.
n/a X X X X X 1.31
TS_30_L Tenmile Slough Left
Eastern levee along Tenmile Slough along the
boundary between Wright-Elmwood Tract and Sargen-
Barnhart Tract. Residential area east of levee.

RD 2074
Sargent-Barnhart Tract XX X X X 1.14
TS_20_L Tenmile Slough Left Levee transitioning from Tenmile Slough. RD 2074 Sar
gent-Barnhart Tract XX X X X 0 . 2 7
TS_10_L Tenmile Slough Left
Eastern levee along San Joaquin River along the west
end Sargent-Barnhart Tract. Residential area east of
levee.

RD 2074
Sargent-Barnhart Tract X X X X 0.68
CR_10_R Calaveras River Right
Northern levee along Calaveras River along the south
end of Sargent-Barnhart Tract. Residential area north
of levee with residential homes close to levee.

SJCFCWCD X X X0 . 4 2
CR_20_R Calaveras River Right
Northern levee along Calaveras River along the south
end of Sargent-Barnhart Tract. Residential area north
of levee with residential homes close to levee.

SJCFCWCD X X X0 . 2 6
CR_30_R Calaveras River Right
Northern levee along Calaveras River along the south
end of Sargent-Barnhart Tract. Residential area north
of levee with residential homes close to levee.

SJCFCWCD X X X0 . 7 1
CR_40_R Calaveras River Right Northern levee along Calaveras River. Residential area north of levee. SJCFCWCD X X X0 . 5 4
CR_50_R Calaveras River Right Northern levee along Calaveras River. Residential area north of levee. SJCFCWCD X X X1 . 2 2
CR_60_R Calaveras River Right Northern levee along Calaveras River . Residential area north of levee with school facilities close to levee. SJCFCWCD X X X0 . 2 5 CR_70_R Calaveras River Right Northern levee along Calaveras River . Residential area north of levee with church facilities close to levee. SJCFCWCD X X X0 . 3 0 Kjeldsen, Sinnock & Neudeck, Inc. Page 1 of 3 Print Date: 1/31/2023

ATTACHMENT E
LCMA District
Incremental Operations and Maintenance Costs
Lower San Joaquin River Project

PROPOSED REMEDIATION MEASURES
Levee Type Proposed Remediation Measure
Levee
Reach Waterway Bank Reach Description
Current
LMA(1)
Federal
Levee
Non-Fed to
Become
Fed
New Levee
to Become
Fed Levee
New
Levee
Seepage
Cutoff
Wall
Levee
Reshaping
Seismic
Fix
Levee
Raising
Erosion
Protection
New
Closure
Structure
Subsidence
Mitigation
Length
(miles)
CR_80_R Calaveras River Right
Northern levee along Calaveras River. Residential
area north of levee with residential homes close to
levee.

SJCFCWCD X X X0 . 5 9
CR_10_L Calaveras River Left
Southern levee along Calaveras River along the north
end of Smith Tract. Residential area south of levee
with residential homes close to levee.

SJCFCWCD X X X0 . 3 3
CR_20_L Calaveras River Left
Southern levee along Calaveras River along the north
end of Smith Tract. Residential area south of levee
with residential homes close to levee.

SJCFCWCD X X X0 . 9 0
CR_30_L Calaveras River Left
Southern levee along Calaveras River along the north
end of Smith Tract. Residential area south of levee
with residential homes close to levee.

SJCFCWCD X X X0 . 4 9
CR_40_L Calaveras River Left
Southern levee along Calaveras River along the north
end of Smith Tract. Residential area south of levee
with residential homes close to levee.

SJCFCWCD X X X X 1.20
CR_50_L Calaveras River Left Southern levee along Calaveras River. Residential area south of levee with school facilities close to levee. SJCFCWCD X X X0 . 3 2 CR_60_L Calaveras River Left Southern levee along Calaveras River. Residential area south of levee with school facilities close to levee. SJCFCWCD X X X0 . 2 7 CR_70_L Calaveras River Left
Southern levee along Calaveras River. Residential
area south of levee with residential homes close to
levee.

SJCFCWCD X X X0 . 5 8
SC_30 Smith Canal Smith Canal Closure Structure n/a X
(4) 0.00
SJR_10_R San Joaquin River Right Area west of Smith Canal Gate adjacent to Stockton Golf & Countr
y Club.

RD 1614
Smith Tract X X X X 0.53
SJR_20_R San Joaquin River Right Area east of Smith Canal Gate along Dad's Point connectin
g to Louis Park. n/a X X X X 0.42
SJR_30_R San Joaquin River Right
Eastern levee along San Joaquin River along the west
end of Boggs Tract. Port of Stockton facilities east of levee.

RD 404
Boggs Tract X X X X 0.65
SJR_40_R San Joaquin River Right
Eastern levee along San Joaquin River along the west
end of Boggs Tract. Port of Stockton facilities east of levee.

RD 404
Boggs Tract XX X0 . 7 9
SJR_50_R San Joaquin River Right
Eastern levee along San Joaquin River along the west
end of Boggs Tract. Port of Stockton facilities east of levee.

RD 404
Boggs Tract XX X0 . 3 3
SJR_60_R San Joaquin River Right
Eastern levee along San Joaquin River along the west
end of Boggs Tract. Port of Stockton facilities east of levee.

RD 404
Boggs Tract XX X0 . 4 3
SJR_70_R San Joaquin River Right
Eastern levee along San Joaquin River along the west
end of Boggs Tract. Residential area east of levee with former Van Buskirk Park close to levee.

RD 404
Boggs Tract XX X0 . 7 5
FCS_10_R French Camp Slough Right
Northern levee along French Camp Slough along the
south end of Boggs Tract. Residential area north of
levee with former Van Buskirk Park close to levee.

RD 404
Boggs Tract XX X1 . 8 4
Kjeldsen, Sinnock & Neudeck, Inc. Page 2 of 3 Print Date: 1/31/2023

ATTACHMENT E
LCMA District
Incremental Operations and Maintenance Costs
Lower San Joaquin River Project

PROPOSED REMEDIATION MEASURES
Levee Type Proposed Remediation Measure
Levee
Reach Waterway Bank Reach Description
Current
LMA(1)
Federal
Levee
Non-Fed to
Become
Fed
New Levee
to Become
Fed Levee
New
Levee
Seepage
Cutoff
Wall
Levee
Reshaping
Seismic
Fix
Levee
Raising
Erosion
Protection
New
Closure
Structure
Subsidence
Mitigation
Length
(miles)
DC_10_R Duck Creek Right Northern levee along Duck Creek east of I-5.

Commercial and residential areas north of levee. SJCFCWCD X X X0 . 1 5 DC_20_R Duck Creek Right Northern levee along Duck Creek. Commercial and residential areas north of levee. n/a X X X X0 . 4 3
DC_30_R Duck Creek Right Northern levee along Duck Creek. Commercial and residential areas north of levee. n/a X X X X0 . 2 7
Levee Mile Totals: 12.67 7.77 2.01 2.01 21.51 3.94 0.94 3.48 4.86 0.00 22.45 22.45 Notes:
(1) LMA = Local Maintaining Agency
(2) SJCFCWCD = San Joaquin County Flood Control and Water Conservation District (3) For the purposes of this Technical Memorandum, the evaluation of O&M costs attributed to the new closure structure at Fourteenmile Slough was not performed
(4) For the purposes of this Technical Memorandum, the evaluation of O&M costs attributed to the new closure structure at Smith Canal was not performed Kjeldsen, Sinnock & Neudeck, Inc. Page 3 of 3 Print Date: 1/31/2023

ATTACHMENT E

Levee Construction and Maintenance Assessment District
Incremental Operations and Maintenance Costs
Lower San Joaquin River Project

EXHIBIT 2
Unit Cost Calculations

ATTACHMENT E
LCMA District
Incremental Operations and Maintenance Costs
Lower San Joaquin River Projec
t

UNIT COST CALCULATIONS

ROCK SLOPE PROTECTION

OPINION OF PROBABLE COSTS
Item Description Qty Unit Unit Price Total
Construction $94,300

1. Mobilization 3% $2,700

2. Erosion Control 3% $2,700

3. Clearing and Grubbing 0.22
AC $5,000 $1,100

4. Quarry Stone Riprap 1,000 TN $70 $70,000

5. Miscellaneous 25% $17,800
Soft Costs 30% $28,300
Contingency 30% $36,800
Total Cost: $159,400
Unit Cost: $159

LEVEE FILL

OPINION OF PROBABLE COSTS
Item Description Qt
y Unit Unit Price Total
Construction $44,500

1. Mobilization 3% $1,300

2. Erosion Control 3% $1,300

3. Clearing and Grubbing 0.69 AC $5,000 $3,500

4. Levee Fill 1,000 TN $30 $30,000

5. Miscellaneous 25% $8,400
Soft Costs 30% $13,400
Contingency 30% $17,400
Total Cost: $75,300
Unit Cost: $75

AGGREGATE BASE

OPINION OF PROBABLE COSTS
Item Description Qty Unit Unit Price Total
Construction $53,000

1. Mobilization 3% $1,500

2. Erosion Control 3% $1,500

3. Aggregate Base 1,000 TN $40 $40,000

4. Miscellaneous 25% $10,000
Soft Costs 30% $15,900
Contingency 30% $20,700
Total Cost: $89,600
Unit Cost: $90
Kjeldsen, Sinnock & Neudeck, Inc. Page 1 of 1 Print Date: 1/31/2023

ATTACHMENT E

Levee Construction and Maintenance Assessment District
Incremental Operations and Maintenance Costs
Lower San Joaquin River Project

EXHIBIT 3
Summary of Vegetation Management Costs
Delta Levees Subventions Maintenance Program
FY 2011-12 to FY 2020-21

ATTACHMENT E
LCMA District
Incremental Operations and Maintenance Costs
Lower San Joaquin River Project

SUMMARY OF VEGETATION MANAGEMENT COSTS

DWR DELTA LEVEES SUBVENTIONS MAINTENANCE PROGRAM
FY 2011-12 TO FY 2020-21
RD Vegetation Management Costs per Fiscal Year(1) Levee No. RD Name 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Miles 1 Union - East $74,116 $118,742 $108,702 $108,063 $84,222 $104,544 $45,335 $65,573 $61,268 $81,357 14.0 2 Union - West $12,224 $7,399 $38,411 $36,221 $16,123 $0 $49,939 $12,195 $27,855 $13,313 16.2 307 Lisbon $49,800 $32,010 $16,320 $18,000 $20,840 $29,107 $24,999 $25,585 $25,217 $26,803 6.6 403 Rough & Ready $0 $0 $0 $0 $0 $0 $0 $93 $0 $1,713 6.8 404 Boggs $499 $1,401 $1,746 $1,565 $1,379 $6,284 $1,733 $1,269 $1,814 $8,225 0.7 501 Ryer $25,633 $61,642 $31,432 $31,377 $32,540 $7,379 $27,212 $38,469 $31,230 $48,406 20.6 524 Middle Roberts $18,800 $17,725 $54,262 $33,905 $34 $19,033 $20,860 $37,574 $22,611 $86,512 9.7 544 Upper Roberts $119,393 $7,069 $0 $44,499 n.r. (2) $0 $211,413 $52,812 $46,646 $81,895 15.0 563 Tyler $66,117 $46,868 $40,013 $40,372 $63,964 $87,344 $68,675 $68,182 $49,581 $41,744 22.9 773 Fabian $21,145 $22,829 $13,770 $38,572 $121,726 $16,092 $59,719 $97,485 $100,003 $83,732 18.8 800 Byron $39,401 $40,919 $35,991 $37,180 $32,522 $28,932 $52,156 $52,625 $54,139 $47,568 9.7 828 Weber n.r. n.r. $0 $0 $31,022 $32,903 $14,462 $34,581 $3,711 $2,540 1.7 1601 Twitchell $36,910 $28,303 $35,388 $27,723 $22,720 $29,925 $12,806 $32,291 $38,439 $11,536 11.9 1608 Lincoln Village West n.r. n.r. n.r. $46,662 $15,342 $17,657 $23,424 $18,554 $71,668 $56,577 3.6 1614 Smith $15,713 $13,909 $0 $73 $324 $0 $0 $0 $1,894 $1,844 2.8 2023 Venice $20,975 $42,138 $52,695 $7,577 $1,674 $24,653 $23,577 $21,132 $57,944 $39,065 12.3 2027 Mandeville $30,290 $24,262 $18,990 $34,370 n.r. $32,836 $46,170 $38,847 $30,548 $32,854 14.3 2030 McDonald $13,132 $27,269 $18,468 $35,712 $59,194 $51,898 $34,906 $45,349 $28,870 $74,148 13.7 2040 Victoria $20,204 $52,456 $129,191 $61,294 $19,596 $20,002 $9,781 $46,446 $21,470 $13,412 15.1 2042 Bishop $18,770 $25,335 $16,404 $0 $12,823 $29,175 $17,632 $55,709 $56,888 $82,489 7.8 2089 Stark $11,275 $18,250 $6,850 $7,450 $31,925 $503 $8,167 $320 $41 $1,073 3.5 2090 Quimby $35,232 $30,419 $8,020 $19,821 n.r. $438 n.r. n.r. n.r. n.r. 7.0 2111 Dead Horse $0 $0 n.r. n.r. $0 $0 $0 $0 $0 $0 2.6
2113 Fay $32,478 $32,725 $10,982 $8,712 $7,988 $8,245 $7,740 $12,426 $18,633 $48,533 1.6 2115 Shima $0 n.r. n.r. n.r. $0 $381 $0 $0 $0 $0 6.6
2117 Coney n.r. n.r. n.r. n.r. n.r. $0 $8,164 $20,558 $37,892 $14,259 5.4 2119 Wright-Elmwood $8,350 $16,642 $23,401 $20,886 $15,501 $21,982 $22,130 $10,243 $26,970 $16,938 7.1 2126 Atlas $7,170 $300 $16,769 $34 $9,344 $6,497 $11,086 $8,687 $30,504 $14,132 3.0 Subtotal Cost (cost year varies)(3): $677,629 $668,611 $677,804 $660,068 $600,802 $575,811 $802,085 $797,005 $845,834 $930,667 261.0 ENR CCI (cost year varies): 9,290.00 9,542.33 9,800.38 10,036.38 10,337.05 10,702.81 11,068.35 11,268.48 11,436.23 12,112.05 ENR CCI (Jan 2023): 13,175.03 13,175.03 13,175.03 13,175.03 13,175.03 13,175.03 13,175.03 13,175.03 13,175.03 13,175.03 Escalation Factor: 1.4182 1.3807 1.3443 1.3127 1.2745 1.2310 1.1903 1.1692 1.1520 1.0878 Total Cost (2023$)(4): $961,009 $923,147 $911,198 $866,490 $765,749 $708,817 $954,748 $931,853 $974,437 $1,012,344 261.0 Cost per Levee Mile (2023$): $3,839 $3,788 $3,753 $3,517 $3,492 $2,716 $3,759 $3,669 $3,836 $3,986 Average (2023$): $3,635 per levee mile per year
Notes:
(1) Annual costs were derived from the "Levee Vegetation Control and Management" costs as shown in the final claims from 28 reclamation districts within the Delta through the DWR Delta Levees Subventions Maintenance Program. (2) n.r. = not recorded. Not all records were available for all reclamation districts and all years. (3) Subtotal costs are based on dollars specific to each fiscal year shown and have not been escalated. (4) Total costs have been escalated to 2023 dollars using ENR-published Construction Cost Indecies (CCIs).

Kjeldsen, Sinnock & Neudeck, Inc. Page 1 of 1 Print Date: 1/31/2023

ATTACHMENT E

Levee Construction and Maintenance Assessment District
Incremental Operations and Maintenance Costs
Lower San Joaquin River Project

EXHIBIT 4
Basis of Levee Footprint Calculations

ATTACHMENT E
73' 128'
20' 20'
18'
9'
10'
3:1
3:1 3:1 3:1

FINISH GRADE

EXISTING GROUND

SEISMIC FIX
FOOTPRINT CALCULATIONS:

PRE-CONSTRUCTION WIDTH: 128 FEET + 20 FEET LANDSIDE RIGHT-OF-WAY = 148 FEET POST-CONSTRUCTION WIDTH: 128 FEET + 73 FEET + 20 FEET LANDSIDE RIGHT-OF WAY = 221 FEET DIFFERENCE: +49.3%
DWSE

DEEP SOIL MIXING COLUMNS (TYP)

LEVEE RAISE
FOOTPRINT CALCULATIONS:

PRE-CONSTRUCTION WIDTH: 110 FEET + 20 FEET LANDSIDE RIGHT-OF-WAY = 130 FEET POST-CONSTRUCTION WIDTH: 110 FEET + 24 FEET + 20 FEET LANDSIDE RIGHT-OF WAY = 154 FEET DIFFERENCE: +18.5%
24' 110'
15'
19'
20'
3:1 3:1

LEVEE RESHAPING
FOOTPRINT CALCULATIONS:

PRE-CONSTRUCTION WIDTH: 88 FEET + 20 FEET LANDSIDE RIGHT-OF-WAY = 108 FEET POST-CONSTRUCTION WIDTH: 88 FEET + 56 FEET + 20 FEET LANDSIDE RIGHT-OF WAY = 164 FEET DIFFERENCE: +51.9%
56' 88'
20' 16'
18'19'
3:1
3:1
2:1 2:1
DWSE
DWSE

EXISTING GROUND

EXISTING GROUND

FINISH GRADE
3:1FINISH GRADE
FILE SPEC:

PLOT DATE:

EXHIBIT NO.

PAGE NO.

DRAWING SCALE
¼"0
ORIG. DRAWING SCALE
½"
711 N. Pershing Avenue
Stockton, CA 95203
209-946-0268
1550 Harbor Blvd., Suite 212
West Sacramento, CA 95691
916-403-5900www.ksninc.com

SJAFCA / SJCFCWCD
ZONE 9 OVERLAY ASSESSMENT

LOWER SAN JOAQUIN RIVER PROJECT O&M

BASIS OF FOOTPRINT CALCULATIONS
N.T.S.
1 1

ATTACHMENT E

Levee Construction and Maintenance Assessment District
Incremental Operations and Maintenance Costs
Lower San Joaquin River Project

EXHIBIT 5
Overall Incremental O&M Annual Costs

ATTACHMENT E
LCMA District
Incremental Operations and Maintenance Costs
Lower San Joaquin River Project

OVERALL INCREMENTAL O&M ANNUAL COSTS
Incremental O&M Annual Cost per Proposed Remediation Measure Total Levee Reach Waterway Bank
Length
(miles)
New
Levee
Seepage
Cutoff Wall
Levee
Reshaping
Seismic
Fix
Levee
Raising
Erosion
Protection
New Closure
Structure
Subsidence
Mitigation
Incremental O&M
Annual Cost
MC_10_L Mosher Slough Left 1.22 $0 $0 $0 $0 $818 $0 $0 $12,161 $12,979 MC_20_L Mosher Slough Left 0.74 $0 $0 $0 $0 $496 $0 $0 $7,365 $7,861 ST_10_R Shima Tract Right 0.47 $0 $0 $0 $0 $0 $1,878 $0 $4,700 $6,577 ST_20_R Shima Tract Right 0.78 $0 $0 $0 $0 $0 $3,111 $0 $7,786 $10,897 FS_10_R Fivemile Slough Right 0.31 $0 $0 $0 $0 $0 $1,225 $0 $3,066 $4,291 FM_60_L Fourteenmile Slough Right 0.31 $0 $0 $0 $0 $208 $1,233 $0 $3,087 $4,527 FM_50_L Fourteenmile Slough Left 0.00 $0 $0 $0 $0 $0 $0 $0(1) $0 $0(1) FM_40_L Fourteenmile Slough Left 0.27 $0 $0 $0 $0 $183 $1,084 $0 $2,713 $3,979 FM_30_L Fourteenmile Slough Left 1.31 $111,586 $0 $0 $0 $0 $5,227 $0 $13,083 $129,896 TS_30_L Tenmile Slough Left 1.14 $0 $0 $2,144 $0 $0 $4,531 $0 $11,341 $18,016 TS_20_L Tenmile Slough Left 0.27 $0 $0 $506 $482 $0 $1,070 $0 $2,679 $4,737 TS_10_L Tenmile Slough Left 0.68 $0 $0 $1,273 $1,211 $0 $0 $0 $6,736 $9,220 CR_10_R Calaveras River Right 0.42 $0 $0 $0 $0 $0 $0 $0 $4,175 $4,175 CR_20_R Calaveras River Right 0.26 $0 $0 $0 $0 $0 $0 $0 $2,618 $2,618 CR_30_R Calaveras River Right 0.71 $0 $0 $0 $0 $0 $0 $0 $7,038 $7,038 CR_40_R Calaveras River Right 0.54 $0 $0 $0 $0 $0 $0 $0 $5,434 $5,434 CR_50_R Calaveras River Right 1.22 $0 $0 $0 $0 $0 $0 $0 $12,135 $12,135 CR_60_R Calaveras River Right 0.25 $0 $0 $0 $0 $0 $0 $0 $2,539 $2,539 CR_70_R Calaveras River Right 0.30 $0 $0 $0 $0 $0 $0 $0 $3,000 $3,000 CR_80_R Calaveras River Right 0.59 $0 $0 $0 $0 $0 $0 $0 $5,844 $5,844 CR_10_L Calaveras River Left 0.33 $0 $0 $0 $0 $0 $0 $0 $3,279 $3,279 CR_20_L Calaveras River Left 0.90 $0 $0 $0 $0 $0 $0 $0 $8,993 $8,993 CR_30_L Calaveras River Left 0.49 $0 $0 $0 $0 $0 $0 $0 $4,870 $4,870 CR_40_L Calaveras River Left 1.20 $0 $0 $2,271 $0 $0 $0 $0 $12,017 $14,289 CR_50_L Calaveras River Left 0.32 $0 $0 $0 $0 $0 $0 $0 $3,149 $3,149 CR_60_L Calaveras River Left 0.27 $0 $0 $0 $0 $0 $0 $0 $2,731 $2,731 CR_70_L Calaveras River Left 0.58 $0 $0 $0 $0 $0 $0 $0 $5,761 $5,761 SC_30 Smith Canal 0.00 $0 $0 $0 $0 $0 $0 $0(2) $0 $0(2) SJR_10_R San Joaquin River Right 0.53 $0 $0 $0 $0 $353 $0 $0 $5,242 $5,595 SJR_20_R San Joaquin River Right 0.42 $0 $0 $0 $0 $281 $0 $0 $4,178 $4,460 SJR_30_R San Joaquin River Right 0.65 $0 $0 $1,224 $0 $0 $0 $0 $6,475 $7,699 SJR_40_R San Joaquin River Right 0.79 $0 $0 $0 $0 $0 $0 $0 $7,884 $7,884 SJR_50_R San Joaquin River Right 0.33 $0 $0 $0 $0 $0 $0 $0 $3,332 $3,332 SJR_60_R San Joaquin River Right 0.43 $0 $0 $0 $0 $0 $0 $0 $4,301 $4,301 SJR_70_R San Joaquin River Right 0.75 $0 $0 $0 $0 $0 $0 $0 $7,446 $7,446 FCS_10_R French Camp Slough Right 1.84 $0 $0 $0 $0 $0 $0 $0 $18,317 $18,317 DC_10_R Duck Creek Right 0.15 $0 $0 $0 $0 $0 $0 $0 $1,500 $1,500 DC_20_R Duck Creek Right 0.43 $36,411 $0 $0 $0 $0 $0 $0 $4,269 $40,680 DC_30_R Duck Creek Right 0.27 $22,636 $0 $0 $0 $0 $0 $0 $2,654 $25,290 Totals: 22.45 $170,634 $0 $7,418 $1,693 $2,338 $19,360 $0 $223,898 $425,340 Notes:
(1) For the purposes of this Technical Memorandum, the evaluation of O&M costs attributed to the new closure structure at Fourteenmile Slough was not performed (2) For the purposes of this Technical Memorandum, the evaluation of O&M costs attributed to the new closure structure at Smith Canal was not performed Kjeldsen, Sinnock & Neudeck, Inc. Page 1 of 1 Print Date: 1/31/2023

ATTACHMENT E

San Joaquin Area
Flood Control Agency

Levee Construction and
Maintenance Assessment
(LCMA)

Appendix B
LCMA Cash Flow and Financing Analysis

San Joaquin Area Flood Control Agency
Date: March 16, 2023

ATTACHMENT E
Appendix B
Levee Capital and Maintenance Assessment (LCMA)
Cash Flow and Financing Plan Analysis ($1,000's)
Total 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 2046 2047 2048 2049 N/C Stockton Flood Program ‐ Beginning Balance [1] 2,218 1,904 5,359 7,468 9,285 7,581 5,905 5,643 4,101 3,447 5,499 4,967 13,968 7,521 8,975 6,949 5,878 62,927 38,095 20,763 19,259 12,595 5,871 ‐594 ‐337 519 1,578 3,245 LSJRP ‐ USACE Authorized Program Expenditures
Funding Implementation Costs 00000000000000000000000000000 SJAFCA Net Contribution Required [2] 119,750 134 1,507 452 1,038 4,680 4,696 3,417 4,730 3,610 960 3,692 4,175 9,025 1,278 4,913 4,120 6,164 23,991 16,663 1,012 6,352 6,597 6,528 00000 Operational Soft Costs [3] 24,270 180 450 800 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 600 600 200 200 Operations and Maintenance
Incremental O&M for LSJRP 36,165 0 90 374 383 415 526 552 682 1,081 1,196 1,225 1,388 1,467 1,502 1,539 1,576 1,614 1,653 1,693 1,734 1,776 1,819 1,863 1,909 1,955 2,002 2,051 2,100 Smith Canal Gate [4]
SCAAD Assessment Revenue Bond Redemption 24,498 0 24,498 00000000000000000000000000 Total Expenditures 204,683 314 26,544 1,626 2,421 6,094 6,221 4,969 6,412 5,691 3,157 5,917 6,563 11,492 3,780 7,452 6,696 8,778 26,644 19,357 3,746 9,129 9,417 9,392 2,909 2,555 2,602 2,251 2,300 State Sources
State TBD for N‐C Stockton Additional Flood Program 00000000000000000000000000000 Local Sources
Proposed LCMA Assessment Net Revenues for Capital Services [4] 220,274 0 0 6,200 6,349 6,501 6,657 6,817 6,981 7,148 7,320 7,495 7,675 7,859 8,048 8,241 8,439 8,642 8,849 9,061 9,279 9,501 9,730 9,963 10,202 10,447 10,698 10,954 11,217 Total LSJR Revenues  220,274 0 0 6,200 6,349 6,501 6,657 6,817 6,981 7,148 7,320 7,495 7,675 7,859 8,048 8,241 8,439 8,642 8,849 9,061 9,279 9,501 9,730 9,963 10,202 10,447 10,698 10,954 11,217 Program Financing: Assessment District Borrowing
Proceeds from Bond Issuance [5] 100,000 0 30,000 000000000 10,000 0000 60,000 00000000000 Debt Service Costs [6] ‐112,939 0 0 ‐2,466 ‐2,111 ‐2,111 ‐2,111 ‐2,111 ‐2,111 ‐2,111 ‐2,111 ‐2,111 ‐2,111 ‐2,814 ‐2,814 ‐2,814 ‐2,814 ‐2,814 ‐7,037 ‐7,037 ‐7,037 ‐7,037 ‐7,037 ‐7,037 ‐7,037 ‐7,037 ‐7,037 ‐7,037 ‐7,037 N/C Stockton Program ‐ Preliminary Ending Balance 1,904 5,359 7,468 9,285 7,581 5,905 5,643 4,101 3,447 5,499 4,967 13,968 7,521 8,975 6,949 5,878 62,927 38,095 20,763 19,259 12,595 5,871 ‐594 ‐337 519 1,578 3,245 5,125 [1] Beginning balance in 2022 is based on annual FY 2022/23 budget adopted by SJAFCA [6] Assumes three Bond Issues in 2023, 2033, 2038, that generate net proceeds of $30M, $10M, and $60M, respectively. [7] Assumes level debt service for all bond issuances.

Source Model: 1820000_2023 0123_N‐C_Stockton_LSJRP_Financing_Model [2] Combination of cash, LERRDs contribution net of funding provided (cash to USACE under DA totals $666,192.46 thru 4/30/2021), and expected credit (e.g. Smith Canal Gate); LERRDs split at NFS cost share amounts; Internal SJAFCA cost, G&A, and consultant costs are credit not accounted for as part of this line item but the upfront cash requirement is captured under "Operational Soft Costs" [3] Soft costs include SJAFCA staff and consultants (e.g. CEQA, project management, technical review and assistance) for costs not likely to be creditable to the Federal Project; Assume 4 FTEs at peak and tapers following project completion; Assume no assessment administration which would be captured in the LCMA budget; Assumes no long‐term G&A costs. [4] Annual escalation assumed at 2.4% (consistent with the authorized escalation described in the Engineer's Report.) [5] Assumes SJAFCA will issue new debt secured by LCMA revenues to redeem outstanding SCAAD series 2019 bonds.

Prepared by LWA 1808000 LCMA ER Tables 2023.02.27.xlsx

ATTACHMENT E

San Joaquin Area
Flood Control Agency

Levee Construction and
Maintenance Assessment
(LCMA)

Appendix C
LCMA Floodplain Analysis, March 16, 2023
(Prepared by R&F Engineering)

San Joaquin Area Flood Control Agency
Date: March 16, 2023

ATTACHMENT E

Levee Construction and Maintenance Assessment (LCMA)
Floodplain Analysis
Prepared for: San Joaquin Area Flood Control Agency
Date: March 16, 2023
Prepared by: Brittney O’Connell, PE and Baron Creager, PE Reviewed by: Mike Rossiter, PE

Introduction
The San Joaquin Area Flood Control Agency (SJAFCA) is advancing a combined assessment district, known as the Levee Construction and Maintenance Assessment (LCMA) District, to fund the (1) additional Operations & Maintenance (O&M) needs of the San Joaquin County Flood Control and Water Conservation District Zone 9 (Zone 9) maintained project levees and (2) the local cost share component associated with the flood risk reduction measures being implemented as part of the U.S. Army Corps of Engineers (USACE) Lower San Joaquin River Project (LSJRP).

As part of the assessment district formation process, R&F Engineering Inc. (R&F) was retained by Larsen Wurzel & Associates (LWA) to assist with floodplain analyses to inform the proportionate level of special benefit that each parcel within the proposed assessment will receive from the activities being funded by LCMA.

The floodplain analysis will be used to identify: which parcels would potentially be flooded from a breach on a LSJRP levee or a Zone 9-maintained project levee, to what extent would the parcel be flooded, what flood depths would the parcel experience, and how many levee miles is each parcel relying on to protect it from flooding.

This Technical Memorandum (TM) outlines the data sources and methodology of R&F’s floodplain analyses. Throughout the TM, the O&M of Zone 9 project levees will be referred to as the “O&M services” and the work being completed as part of the USACE LSJRP will be referred to as “capital improvements”.

ATTACHMENT E
Technical Memorandum

LCMA Floodplain Analysis 2 March 16, 2023
Baseline Data
To the extent available, existing analyses were used to estimate the floodplain depths and extents for this effort. The following subsections summarize the data sources that were used for the floodplain analyses as part of defining the benefit areas for the O&M services and the capital improvements.

O&M Services
The floodplains for the O&M analysis originated from two sources: the California Department of Water Resources (DWR) Central Valley Floodplain Evaluation and Delineation (CVFED) Task Order (TO) 306 analysis1 and the Peterson Brustad Inc. (PBI) floodplain analysis2.

As part of DWR’s TO306 work, a hydraulic model was developed and various levee breach scenarios were analyzed. The model and levee breach scenarios covers a large portion of the SJAFCA LCMA study area. The primary resources used for this DWR analyses include:
• DWR Central Valley Floodplain evaluation and Delineation (CVFED) TO306 FLO2D model • DWR’s CVFED TO24 and HEC-RAS v4.1 model3
• United States Army Corps of Engineers (USACE) Lower San Joaquin River Feasibility Study (LSJRFS)4 hydrologic analysis
For the portion of the LCMA study area that was not covered by the CVFED analyses, PBI developed a 1D/2D HEC-RAS 5.0 model from the DWR CVFED HEC-RAS 4.1 model to perform additional levee breach scenarios.

PBI breach parameters were set to match the parameters used in the CVFED analyses. Breach formation time was set to be instant, breach width set to be equal to 50 times the levee height, and breaches were set to erode to the elevation of the landside toe of the levee. The 1D reaches from the DWR HEC-RAS 4.1 model were not altered when updating to the 1D/2D HEC- RAS 5.0 model. The modifications to the model included converting overbank areas to a 2D mesh using the following steps:
• Importing DWR’s 1-meter resolution CVFED LiDAR ground elevation data5 into the model
• Converting 1D storage areas to 2D gridded flow areas at 250ft x 250ft resolution

1 DWR. CVFED TO 306: Technical Memorandum- Hydraulic Analysis for 200-Year Floodplain Inundation Data in Technical Support of Local Communities, prepared by HDR, Inc., December 2014. 2 PBI. FloodCALM Assessment District Floodplain Analysis. August 2019. 3 DWR. CVFED Program for the Lower San Joaquin River: Task Orders 24 and 25, Technical Memorandum Lower San Joaquin River System HEC-RAS Model Development, Prepared by HDR, Inc., February 2010. 4 USACE Lower San Joaquin River Feasibility Study F3 Hydrology Appendix, prepared by PBI, July 2012. 5 HDR Engineering, Inc. CVFED LiDAR Data, Task Order 20, “Secondary LiDAR Post Processing in Support of Hydraulic Model Development”, June 2010.

ATTACHMENT E
Technical Memorandum

LCMA Floodplain Analysis 3 March 16, 2023
• Assigning Manning’s n values for the overland 2D areas based on land use type. San Joaquin County zoning GIS data6 was used to identify land use types in the floodplain.

Guidance from the DWR CVFED FLO2D analysis was used in assigning n-values to the various land use types.

Figure 1 shows the extents of the CVFED and PBI modeling that was used to support the O&M floodplain analysis.

Capital Improvements
The floodplains for the USACE LSJRP capital improvement area originated from the USACE Risk and Uncertainty (R&U) composite floodplains developed as part of the USACE Lower San Joaquin River Feasibility Study (LSJRFS)7. The USACE composite floodplains were developed to compare the extents of flooding with- and without the LSJRP (Phase 1) improvements in place.

6 San Joaquin County. “Zoning.shp”. GIS Shapefile Acquired July 2015. 7 USACE. Integrated Interim Feasibility Report/ Environmental Impact Statement/ Environmental Impact Report.

San Joaquin River Basin, Lower San Joaquin River.

ATTACHMENT E
0 3.51.75
Mi
San Joaquin Area Flood Control Agency
2270 Douglas Blvd, Suite 118
Roseville, CA 95661
(209)304-1739
O&M Services
Models Supporting Evaluation of Benefit from O&M
Date: 2/3/2023
Figur
e
1 µ
Path: C:\Users\NickMcGuire\R&F Engineering, Inc\R&F Engineering - Documents\4.0 GIS\Project\SJAFCA\LSJR-O&M Assessment\APRX\Presentation Model Extent Figure.aprx Zone 9 Maintained Channels
CVFED FLO-2D Area
PBI HEC-RAS Model Area
Calaveras River
Mosher
Slough
Mormo
n Slough
San Joa
quin River
Duck Creek
North Littlejohns Creek
Bear Cr
eek

ATTACHMENT E
Technical Memorandum

LCMA Floodplain Analysis 5 March 16, 2023
Methodology
The following subsections summarize the methodology used to help identify proportionate benefit provided to each parcel from the O&M services and from the USACE LSJRP capital improvements.

O&M Services
To identify the areas protected by Zone 9-maintained project levees, a levee breach modeling analysis was conducted to identify flood extents and depths that would result in a levee failure scenario on these levees. A total of 72 breach scenarios were completed to represent flooding that could occur if a Zone 9-maintained levee were to fail at a specific location within the system. A 200-year flow event was used as the basis of the breach analysis to show the potential floodplains in a scenario where the system was flowing full. Figure 2 provides an overview of the breach locations included in this analysis The DWR CVFED modeling covered 54 breach scenarios throughout the study area. A portion of the levee on the Calaveras River downstream of Brookside Road is maintained by others and that portion was excluded from the breach analysis. The PBI model covered the 18 additional breach locations (for a total of 72 breach scenarios) . A channel overtopping scenario was also included in this analysis to determine flood depths that result without levee breaches when the channels exceed their capacity. As the channel overtopping is not prevented by Levee O&M services, this additional scenario was ultimately not utilized in LWA’s analysis of special benefits.

ATTACHMENT E
µ
0 21
Mi
Date: 2/3/2023
San Joaquin
Area Flood Control Agency
Breach Location Overview for
Zone 9 O&M Project Levees
Figure
2 Breach Location
River
Path: C:\Users\NickMcGuire\R&F Engineering, Inc\R&F Engineering - Documents\4.0 GIS\Project\SJAFCA\LSJR-O&M Assessment\APRX\Breach Location\Breach Location.aprx 2270 Douglas Blvd, Suite 1
18 Roseville, CA 95661
(209)304-1739
PDC_R6
BRC_R10
MHC_R1
MHC_L2
SPC_R1
PDC_L1
WRS_R1
SPC_L1
SDC_R4
SDC_L7
SDC_L5
SDC_L1
PXS_R3
PXS_L2
PDC_L2
MHC_L1
MPC_L1
MNS_R2MNS_R1
MNS_L2
MNS_L1
MHD_L1
LMH_R1
CSR_L3
BRC_R9BRC_R7
BRC_R6
BRC_R5
BRC_R4
BRC_R3
BRC_L9
BRC_L8
BRC_L7
BRC_L2
BRC_L14
WRS_L1
BRC_L11
SDC_R3
SDC_L6
SDC_L4
SDC_L3SDC_L2
PXS_R2
PXS_R1
PXS_L1
SDC_R5
PDC_R3
PDC_R1
PCA_L1
MPC_L2
LMH_L1
FCS_R1
FCS_L1
CSR_R5
CSR_R4
CSR_R3CSR_R2
CSR_R1
CSR_L2
CSR_L1
BRC_R8
BRC_R14
BRC_R13
BRC_R12
BRC_R11
BRC_R1
BRC_L5
BRC_L4
BRC_L3
BRC_L13
BRC_L10
BRC_L6
Lodi
Stockton

ATTACHMENT E
Technical Memorandum

LCMA Floodplain Analysis 7 March 16, 2023

During the analysis, it was observed that some of the floodplains from the DWR CVFED FLO2D model needed to be refined due to the coarse resolution of the model grid cells (250ft x 250ft).

Parcels adjacent to levees and waterways were not captured as being within the floodplain due to the model’s grid cell size. Refinements were made within GIS to assign flood depths to these areas by interpolating adjacent flooded cells. An example of this correction is shown below in Figures 3 & 4.

Figure 3 (left) & Figure 4 (right): FLO2D Floodplain Shows No Flooding in Various Parcels Along the landside levee toes (Left).

And Modified Floodplain to More Accurately Estimate Flooding in Parcels Along the Levee toes (Right).

To generate flooding statistics for each parcel in the study area, GIS shapefiles with parcel-level data were generated for the 72 levee breach scenarios. The parcel-level data include the average floodplain depth (feet) and total wetted area (acres) for each parcel and each scenario, as described in Attachment A.

Additionally, levee reaches (and the corresponding breach scenarios) were categorized by whether they were FEMA accredited, cost-shared with other public entities, and/or if they are USACE Project Levees.

Capital Improvements
To assist in the determination of the proportionate benefit provided to each parcel by the USACE LSJRP capital improvements, floodplain modeling from the USACE LSJRFS for the 100- year flow scenario was used.

A “composite” floodplain was created from the individual levee breach scenarios that were modeled by USACE on levees that are part of the USACE LSJRP. The composite floodplain captures the anticipated worst-case scenario of flooding of all the breach scenarios for each parcel.

Similar to the O&M analysis, GIS shapefiles with parcel-level flooding data were generated and to identify the average floodplain depth (feet) and total wetted area (acres) for each parcel, as presented in Attachment B.

ATTACHMENT E
Technical Memorandum

LCMA Floodplain Analysis 8 March 16, 2023
Floodplain Analyses Results
The following subsections and figures summarize the results of the floodplain analyses.

O&M Services
The results of the O&M floodplain analysis are shown in Figure 5 which includes a composite of the 72 individual levee breach scenarios located on Zone 9 maintained Project levees. The map also includes flooding in areas where channels exceed capacity and are overtopped, however this “overtopping” flooding was backed out of LWAs assessment analysis as channel overtopping is not prevented by Levee O&M services.

Capital Improvements
The results of the capital improvement levee breach analysis are shown in Figure 6, which are areas that could be inundated if a levee breach were to occur on a USACE LSJRP levee.

Summaries of parcel-level flooding data for the O&M Services and the USACE LSJRP capital improvements were generated in GIS and are included in Attachments A and B, respectively.

ATTACHMENT E
San Joaquin Area Flood Control Agency
2270 Douglas Blvd, Suite 118
Roseville, CA 95661
(209)304-1739
O&M Services
Composite Floodplain of Areas Maintained by
San Joaquin County Zone 9 Date: 2/3/2023
Figure
5 Path: C:\Users\NickMcGuire\R&F Engineering, Inc\R&F Engineering - Documents\4.0 GIS\Project\SJAFCA\LSJR-O&M Assessment\APRX\Presentation Floodplain Figure.aprx µ
0 2.5 51.25
Miles
Mosher
Slough
Calaveras River
Duck Creek
North Littlejohns Creek
San Joa
quin River
Breach Location
> 5
2 - 5
1 - 2

0.5 - 1
< 0.5
Floodplain Depth (ft)
Bear Cr
eek
Mormo
n Slough

ATTACHMENT E
FR1
CL1
D5
D4
CR1
D3
San Joaquin Area Flood Control Agency
2270 Douglas Blvd, Suite 118
Roseville, CA 95661
(209)304-1739
Composite Floodplain of Levee Breaches
Occurring on
USACE LSJRP Levees
Date: 2/3/2023
Figure
6 Path: C:\Users\NickMcGuire\R&F Engineering, Inc\R&F Engineering - Documents\4.0 GIS\Project\SJAFCA\LSJR-O&M Assessment\APRX\Presentation AD Project Breaches.aprx > 5
2 - 5
1 - 2

0.5 - 1
< 0.5
Inundation from Breaches on USACE
LSJRP Levees (ft)
USACE LSJRP Levees
Mosher Slough
Calaveras River
Duck C
reek
North Littlejohns Creek
San Joa
quin River
µ
0 10.5
Mi

ATTACHMENT E
Technical Memorandum

LCMA Floodplain Analysis 11 March 16, 2023
Assessment Boundary Delineations
The Proposed Assessment Boundary encompasses all properties that receive a special benefit from Zone 9 O&M Services and from the USACE LSJRP. The floodplain analyses discussed above were used as a starting point in developing a proposed benefit area for the LCMA District. The following subsections summarize the process that was used to delineate the final area of benefit.

O&M Assessment Boundary
As described in the previous sections, to determine areas that benefit from the Levee O&M Services on the Zone 9 Project levees, modeling of various levee breach scenarios was performed to identify properties that would be inundated if those levees were to break. From these analyses, a composite floodplain was developed (previously shown in Figure 5). The resulting floodplain from each breach was overlaid in GIS onto the San Joaquin County parcel database to identify the average flood depth, total area of flooding, and length of levee that is providing protection for each parcel. The final assessment boundary for Levee O&M Services was delineated based on the boundaries of the parcels that are flooded from levee breaches on Zone 9 maintained Project levees.

Capital Assessment Boundary
Properties receiving special benefit from the USACE LSJRP (and associated incremental levee O&M for the LSJRP) were identified using a combination of floodplain mapping that included:
a) The 100 -year composite without project floodplain based on breaches of levees to be improved by the USACE LSJRP (previously shown in Figure 6); b) The FEMA Shaded Zone X mapping for north and central Stockton; and, c) Additional hydraulic modeling showing the extent of the inundation from breaches of upstream FEMA Accredited Levees.

Benefits to properties can be due to avoidance of actual flood damage and/or avoidance of regulatory impacts. The composite without-project floodplain map, utilizing USACE floodplain mapping data, was prepared to identify the specific area benefiting from the improvements on the LSRJP levees. To further acknowledge the risk of regulatory impacts and the need to continue FEMA accreditation of this area, the extent of the floodplain for properties benefiting from FEMA Accredited levees in the same levee system was overlaid onto the composite breach floodplain (see Figure 7). To further confirm the extents of flooding that would result from a break on the upstream FEMA-accredited levees, modeling of breaches on these levees is also included on Figure 7.

ATTACHMENT E
CSR_R5
CSR_R4
SDC_L6
SDC_L5
SDC_L4
SDC_L3
SDC_L2
SDC_L1
PCA_L1SDC_L7
CSR_L2
CSR_R3
MNS_L1
CSR_R2
FR1
CL1
D5
D4
CR1
D3
0 10.5
Mi
San Joaquin Area Flood Control Agency
2270 Douglas Blvd, Suite 118
Roseville, CA
95661
(209)304-1739
Overlay of Capital Improvement
Floodplain Boundaries
Date: 3/16/2023
Figure
7 Path: C:\Users\AndrewNisenberg\R&F Engineering, Inc\R&F Engineering - Documents\4.0 GIS\Project\SJAFCA\LSJR-O&M Assessment\APRX\Presentation AD Flood Boundary.aprx > 5
2 - 5
1 - 2

0.5 - 1
< 0.5
Inundation from Breaches on USACE
LSJRP Levees (ft)
I
nundation from Breaches on Upstream FEMA
Accredited Levees
FEMA “X Protected by Levee” Zone
Proposed Capital Boundary
USACE LSJRP Levees
Breaches on USACE LSJRP Levees
Breaches on Upstream Accredited Levees
Mosher Slough
Calaveras River
Duck C
reek
North Littlejohns Creek
San Joa
quin River
µ

ATTACHMENT E
Technical Memorandum

LCMA Floodplain Analysis 13 March 16, 2023
The three described components designate the full extent of the area benefiting from Levee Capital Services for FEMA Accredited Levees. Because different sources of floodplain mapping were combined, the floodplain mapping associated with the FEMA Accredited levee breaches was only utilized to inform the extent of the benefit area from Levee Capital Services, not floodplain depths. The final capital assessment boundary (Figure 8) follows the impacted parcel boundaries.

ATTACHMENT E
0 10.5
Mi
San Joaquin Area Flood Control Agency
2270 Douglas Blvd, Suite 118
Roseville, CA
95661
(209)304-1739
Capital Assessment Boundary
Date: 3/16/2023
Figure
8 µ
Path: C:\Users\AndrewNisenberg\R&F Engineering, Inc\R&F Engineering - Documents\4.0 GIS\Project\SJAFCA\LSJR-O&M Assessment\APRX\Presentation AD Proposed and Final Boundary.aprx Calaveras River
Mosher Slough
Mormo
n Slough
San Joa
quin River
Duck C
reek
North Littlejohns Creek
Initial Floodplain Boundary
Capital Assessment Boundary

ATTACHMENT E
Technical Memorandum

LCMA Floodplain Analysis 15 March 16, 2023
LCMA District Boundary
The area of special benefit from O&M Services and from the USACE LSJRP capital improvements were combined (Figure 9). The final LCMA Boundary is presented in Figure 10.

ATTACHMENT E
0 31.5
Mi

SJAFCA LCMA
2270 Douglas Blvd, Suite 118
Roseville, CA
95661
(209)304-1739
Combined Boundaries
O&M Services & Capital Improvements
Date: 3/16/2023
Figure
9 µ
Path: C:\Users\AndrewNisenberg\R&F Engineering, Inc\R&F Engineering - Documents\4.0 GIS\Project\SJAFCA\LSJR-O&M Assessment\APRX\Presentation Boundaries Figure.aprx Zone 9 Maintained Levees
Zone 9 OM Assessment Boundary
Capital Assessment Boundary
Calaveras River
Mosher
Slough
Mormo
n Slough
San Joa
quin River
Duck C
reek
North Littlejohns Creek

ATTACHMENT E
0 31.5
Mi
SJAFCA Levee Construction and Maintenance Assessment
2270 Douglas Blvd, Suite 118
Roseville, CA
95661
(209)304-1739
LCMA District Boundary
Date: 3/16/2023
Figure
10 µ
Path: C:\Users\AndrewNisenberg\R&F Engineering, Inc\R&F Engineering - Documents\4.0 GIS\Project\SJAFCA\LSJR-O&M Assessment\APRX\Presentation LCMA Boundary Figure.aprx LCMA Boundary
Calaveras RiverMosher
Slough
Mormo
n Slough
San Joa
quin River
Duck C
reek
North Littlejohns Creek

ATTACHMENT E

ATTACHMENT A
Metadata for GIS Deliverables
for the O&M Assessment Analyses

ATTACHMENT E
1 LSJRP O&M Assessment District September 21, 2022
Attachment A

Assessment Reaches.shp:

Description: All of the levees in the study area were broken down into segments. Each levee segment is associated with a modeled levee breach (see Breach Location Final.shp).

Brch_Rch: Name of reach

Breach Location Final.shp:

Description: 72 levee breaches were modeled for this study. This shapefile shows location and name/ID of each breach. It also indicates whether or not the breach location is on a Project levee, a SJAFCA levee, or a FEMA-accredited levee.

River: River the breach is located on
Code Name: Name of the breach. Note: some breaches are grouped together from original source.

Project: Is the breach on a Project or non-Project levee? SJAFCA: Is the breach on a levee cost shared with SJAFCA? FEMA: Is the breach on a FEMA accredited levee?

Parcel Ave Depth.shp:

Description: This shapefile shows the average depth of flooding on each parcel for each of the 72 levee breach scenarios that were run for this study. Levee breach locations were named according to the river that they are on and whether they’re on the left bank or right bank levee. This shapefile also shows the average depth of flooding on each parcel for the no breach/overtopping only scenario in the PBI (HEC-RAS) model.

ATTACHMENT E
2 LSJRP O&M Assessment District September 21, 2022
Attachment A

The average flood depth recorded is for the wetted area of the parcel only (zero depth/dry areas were not included in calculating the average depth of flooding).

The shapefile also has columns that show the total area of the parcel (acres) and the worst-case flood depth (feet) on each parcel.

Note: See the shapefile “Parcel Wetted Area.shp” which indicates how many acres of the parcel got wet for each breach scenario.

APN: APN
Area_acre: Total area of the parcel (in acres)
BRC_L2 through WRS_L1: The column headers are the name given to each breach location. Average depth of flooding (in feet) associated with each breach per the name of the field
NoBreach: Average depth of flooding (in feet) associated with the no breach/overtopping only scenario in the PBI (HEC-RAS) model

Parcel Wetted Area.shp:

Description: See description for the “Parcel Ave Depth.shp” shapefile. Everything is set up the same, except the values in this shapefile indicate how many acres of the parcel got wet for each breach scenario.

ATTACHMENT E

ATTACHMENT B
Metadata for GIS Deliverables
for the Capital Assessment Analyses

ATTACHMENT E

Parcel Average Depth.shp:

Description: This shapefile shows the average depth of flooding of each parcel for each of the 12 flood scenarios that were analyzed for this study. Scenarios are labeled according to “with project” and “without project” conditions and each return period event. The average flood depth recorded is for the wetted area of the parcel only (zero depth/dry areas were not included in calculating the average depth of flooding).

The shapefile also has columns that show: What is the total area of the parcel in acres? What is the worst-case flood depth on each parcel?

Notes:

1. There are no parcels with flooding for the 2-, 10-, and 25-year with-project events.

2. See the shapefile “Parcel Wetted Area.shp” which indicates how many acres of the parcel got wet for each flood scenario.

APN: APN
Area: Total area of the parcel (in acres)
Max: The worst-case average depth of flooding (in feet) across all scenarios WP_2YR through WOP_200YR: The column headers are the name given to each flood scenario. Average depth of flooding (in feet) is associated with each scenario per the name of the field

Parcel Wetted Area.shp:

Description: See description for the “Parcel Ave Depth.shp” shapefile. Everything is set up the same, except the values in this shapefile indicate how many acres of the parcel got wet for each breach scenario

ATTACHMENT E

San Joaquin Area
Flood Control Agency

Levee Construction and
Maintenance Assessment
(LCMA)

Appendix D
Assessment District Boundary Diagram
(reduced from 18”x26” to 11”x17”)

San Joaquin Area Flood Control Agency
Date: March 16, 2023

ATTACHMENT E

ATTACHMENT E

San Joaquin Area
Flood Control Agency

Levee Construction and
Maintenance Assessment
(LCMA)

Appendix E
San Joaquin County Use Codes
& Assessment Land Use Categories

San Joaquin Area Flood Control Agency
Date: March 16, 2023

ATTACHMENT E
Appendix E
Levee Capital and Maintenance Assessment (LCMA)
San Joaquin County Use Codes & Assessment Land Use Categories Use Code County  Description Land Use Category
/ Sub‐Category
1 Vacant Residential Lot – Development with Utilities Open  Space ‐ Developed 2 Vacant Lot with PROB. W/C Precludes Building A RE Open  Space 3 Vacant Lot – Totally Unusable (incurable) Open Space
4 Vacant Reside ntial Lot with miscellaneous Residential IMPRS (garage)
Open Space ‐ Developed
5 Vacant Residential Subdivision Site Open Space
6 Vacant Residential Lot‐ Undeveloped Open Space
7 Potential Residential Subdivision Open Space
10 Single‐Family Dwelling (SFD) Single‐Family Residential 11 Condominium Unit Multi‐Family Residential
12 Planned Unit Residential Development (PURD) Single‐Family Residential 13 Single‐Family Residence with Secondary Residential Square Footage
Single‐Family Residential
14 SFD with
Secondary Use (i.e., barber shop) Single‐Family Residential 15 Zero Lot Line Residential Single‐Family Residential
16 Residential Lot with Mobile Home Mobile Home
17 Single‐Family with Common Wall (duet, halfplex, etc.) Single‐ Family Residential 20 Vacant Lot (zoned for two units) Open Space
21 One Duplex – One Building Single‐Family Residential
22 Two SFDs On Single Parcel Mu lti‐Family Residential
30 Vacant Lot Zoned for 3 or 4 Units Open Space
31 Single Triplex – (3 units, 1 structure) Single‐Family Residential 32 Three Units ‐ 2 or More Structures Multi‐Family Residential 34 Single Fourplex Multi‐Family Residential
35 Four Units, 2 or More Structures Multi‐Family Residential 40 Vacant Lots Zoned for Apartments Open Space
41 5‐10 Residential Units – Single Build ing Multi‐Family Residential 42 5‐10 Residential Units – 2 or more Buildings Multi‐Family Residential 43 11‐20 Residential Units – One Structure Multi‐Family Residential 44 11‐20 Residential Units – 2 or more Buildings Multi‐Family Residential 45 21‐40 Units Multi‐Family Residential
46 41‐100 Units Multi‐Family Residential
47 Over 100 Units Multi‐Family Residential
48 High‐Rise Apartments Multi‐F
amily Residential
50 Rural Residential – Vacant Homesite Agricultural
51 Rural Residence – 1 Residence Rural Residential
52 Rural Residential – 2 or more residences Rural Residential 53 Rural Residential – Vacant – Development with Open Space ‐ Developed 54 Rural Residences. ‐ with Miscellaneous Residences. IMPS; Only
Open Space
55 Labor Camp Rural Residential
56 Rural Residential with Mobil Home Mobile Home
Prepared by LWA Page E ‐ 1 1808000 LCMA ER Tables 2023.02.27.xlsx

ATTACHMENT E
Appendix E
Levee Capital and Maintenance Assessment (LCMA)
San Joaquin County Use Codes & Assessment Land Use Categories Use Code County  Description Land Use Category
/ Sub‐Category
59 Residential Care Home (6 units or less) Multi ‐Family Residential 60 Motels Less Than 50 Units Commercial
61 Motels Over 50 Units Commercial
62 Motels less than 50 units with some kitchens Commercial 63 Motels over 50 Units with some Kitchens Commercial
64 Motels Less Than 50 Units with Shops Commercial
65 Motels Over 50 Units with Shops Commercial
68 Resort Motels – Cabins, Etc. Commercial
70 Hotel without Re
staurant Commercial
71 Hotel with Restaurant Commercial
78 Rooming House – Convent – Rectory, Etc. Commercial
80 Common Areas – No Structures Open Space
81 Common Areas – with Structures Open Space ‐ Developed 82 Common Areas – Roads and Streets Open Space
90 Mobile Home Park Mobile Home
91 Overnight Type Trailer Park Open Space
92 Mobile Home Park with Overnight Facilities Mobile Home 93 Resort Type Trailer Par k Mobile Home
94 Mobile Home Condominium Lot Mobile Home
95 Mobile Home Appurtenances Mobile Home
96 Mobile Home Mobile Home
100 Vacant Commercial Land – Undeveloped Open Space
101 Vacant Commercial Land with Utilities Open Space ‐ Developed 102 Vacant Commercial Land with Miscellaneous IMPS Open  Space ‐ Developed 107 Potential Commercial Subdivision Open Space
110 Single‐Story Commercial
111 Multiple‐Story Stories Commercial
112 Multiple Stores in one Building Commercial
113 Store with Re
sidential Unit or Units Commercial
114 Store Condo Commercial
120 1 store and 1 office Commercial
121 Multiple Combination of Offices, Shops Commercial
130 1‐Story Department Store Commercial
131 2‐Story Department Store Commercial
140 Grocery Store Commercial
141 Supermarkets Commercial
142 Convenience Store Commercial
143 Convenience Store with Gas Sales Commercial
144 Fruit Stand Commercial
150 Regional Shopping Center Commercial
151 Community Shopping Center Commercial
152 Neighborhood Shopping Center Commercial
Prepared by LWA Page E ‐ 2 1808000 LCMA ER Tables 2023.02.27.xlsx

ATTACHMENT E
Appendix E
Levee Capital and Maintenance Assessment (LCMA)
San Joaquin County Use Codes & Assessment Land Use Categories Use Code County  Description Land Use Category
/ Sub‐Category
153 Individual Parcel Within Regional Shopping Commercial 154 Individual Parcel Within Community Center Commercial 155 Individual Parcel within neighborhood Shopping Commercial 156 Shopping Center Common Area Commercial
170 1‐Story Office Building Commercial
171 2‐Story Office Building Commercial
172 3 or More Story Office Building Commercial
173 Office Building with Residential Unit or Units Commercial 180 Assisted Living Residence Multi‐Family Residential
181 Congregate Seniors Housing Multi‐Family Residential 182 Continuing Care Retirement  Community Multi‐Family Residential 183 Skilled Nursing Facility Multi‐Family Residential
184 Specialty Home (Developmentally Disable) Multi‐Family Residential 190 Medical Offices Commercial
191 Dental Offices Commercial
192 Medical Dental Complex Commercial
193 Veterinary Hospitals Commercial
194 One‐Story Office Condo Commercial
195 Two‐Story Office Condo Commercial
196 Medical Office Condo Commercial
197 Dental Office Condo Commercial
200 Commercial Common Area – Non Shopping C Commercial
201 Miscellaneous Multiple Uses – None Fully Do minant Commercial 202 Commercial Use Commercial
203 Animal Training Facility Commercial
204 Day Care Center Commercial
210 Restaurants Commercial
211 Fast Food Restaurants Commercial
212 Food Preparation – Take Out Only Commercial
213 Cocktail Lounge – Bars Commercial
214 Restaurant with Residential Unit or Units Commercial 230 Walk‐In Theaters Commercial
231 Multiple Screen Theaters Commercial
240 Banks Commercial
250 Full Service Stations Commercial
251 Self Service. Station (has no facilities) Commercial 252 Service Station with Car Wash Commercial
253 Tr
uck Terminals Commercial
254 Bulk Plants Commercial
255 Self Service Station with Mini Mart Commercial
256 Convenience Store (mini‐mart) with gas station Commercial 260 Auto Sales with Service Center Commercial
Prepared by LWA Page E ‐ 3 1808000 LCMA ER Tables 2023.02.27.xlsx

ATTACHMENT E
Appendix E
Levee Capital and Maintenance Assessment (LCMA)
San Joaquin County Use Codes & Assessment Land Use Categories Use Code County  Description Land Use Category
/ Sub‐Category
261 Auto Sales without Service Center Commercial
262 Used Car Lot Commercial
263 Other Sales Centers (Trailers, mobile home Commercial 270 Farm or CONTS. Machine Sales and Service Commercial 271 Farm or CONTS. Machine Sales Only Commercial
272 Farm or CONST. Machine Sales Only Commercial
280 Auto and Truck Repairs and Accessories Commercial
281 Specialty Shops (Tires, Brakes, Etc.) Commercial
282 Car Wash Commercial
283 Self Service Car Wash Commercial
284 Laundry Commercial
285 Auto Body Shop Co
mmercial
290 Retail Nursery Commercial
291 Commercial/Wholesale Nursery Commercial
296 Commercial Commercial
300 Vacant Industrial Land Undeveloped Open Space
301 Vacant Industrial Land – Developed With Open Space ‐ Developed 302 Vacant Industrial Land with Miscellaneous IMPS Open Space ‐ Developed 307 Potential Industrial Subdivision Open Space
310 Light Manufacturing and Light Industrial Industrial 311 Light Industrial and Warehousing Industrial
312 Light Industrial Warehouse Multiple Tenants Industrial 313 Industrial Condo Industrial
314 Shop‐Work Area with Smal l Office Commercial
320 Warehousing – Active Industrial
321 Warehousing – Inactive Industrial
323 Warehousing – Yard Industrial
324 Mini Storage Warehousing Industrial
330 Lumber Mills Industrial
331 Retail Lumber Yards Industrial
332 Specialty Lumber Products (Mouldings, SA Industrial 340 Packing Plants Industrial
341 Cold Storage or Refrigerated Warehouse Industrial
350 Fruit and Vegetable Industrial
351 Meat Products Industrial
352 Large Winery Industrial
353 Small/Boutique Winery Commercial
355 Other Food Processing Industrial
360 Feed and Grain Mills Industrial
361 Retail Feed and Gr ain Sales Industrial
362 Stockyards Industrial
363 AG Chemical Sales and/or Application Industrial
Prepared by LWA Page E ‐ 4 1808000 LCMA ER Tables 2023.02.27.xlsx

ATTACHMENT E
Appendix E
Levee Capital and Maintenance Assessment (LCMA)
San Joaquin County Use Codes & Assessment Land Use Categories Use Code County  Description Land Use Category
/ Sub‐Category
370 Heavy Industry Industrial
371 Shipyard Industrial
380 Mineral Processing Industrial
381 Sand and Gravel – Shale Industrial
390 Industrial Common Area Industrial
391 Miscellaneous Industrial Multiple Uses – None Full Industrial 392 Industrial Use (doesn't reasonably fit any Industrial 393 Airport (private Commercial
400 Irrigated Orchard Agricultural
401 Irrigated Orchard with Residence Agricultural
410 Irrigated Agricultural
411 Irrigated Agricultural
420 Irrigated Vineyard Agricultural
421 Irrigated Vineyard with Residence Agricultural
450 Irrigated Row Crops Agricultural
451 Irrigated Row Crops with Residence Agricultural
460 Irrigated Pasture Agri cultural
461 Irrigated Pasture with Residence Agricultural
462 Horse Ranch Agricultural
463 Horse Ranch with Residence Agricultural
470 Dairy Agricultural
471 Dairy with Residence Agricultural
480 Poultry Ranch Agricultural
481 Poultry Ranch with Residence Agricultural
490 Feed Lots Agricultural
500 Dry Farm Agricultural
501 Dry Farm with Residence Agricultural
510 Dry Graze Agricultural
511 Dry Graze with Residence Agricultural
520 Non‐Irrigated Vineyards Agricultural
521 Non‐Irrigated Vineyards with Residence Agricultural 530 Specialty Farms Agricultural
540 Agricultural Agricultural
550 Tree Farm Agricultural
551 Tree Farm (with or without re sidence) Agricultural 570 Agricultural Agricultural
590 Waste Lands Open Space
591 Berms Open Space
610 Swim Centers Commercial
611 Recreational Centers Commercial
612 Marina or Yachting Club Commercial
613 Racquetball Club Commercial
Prepared by LWA Page E ‐ 5 1808000 LCMA ER Tables 2023.02.27.xlsx

ATTACHMENT E
Appendix E
Levee Capital and Maintenance Assessment (LCMA)
San Joaquin County Use Codes & Assessment Land Use Categories Use Code County  Description Land Use Category
/ Sub‐Category
614 Tennis Club Commercial
615 Private Campground or Resort Commercial
620 Privately Owned Dance Halls Commercial
630 Bowling Alleys Commercial
631 Arcades and Amusement Centers Commercial
632 Skating Rink Commercial
640 Clubs, Lodge Halls Commercial
650 Privately Owned Auditoriums and Stadiums Commercial 660 18‐Hole Public Golf Course Open Space
661 9‐Hole Public Golf Course Open Space
662 Country Club Open Space
664 Driving Range Open Space
670 Privately Owned Race Tracks Commercial
680 Non‐Profit Organizations Camps (Boy Scouts, Etc.) Commercial 690 Pr
ivately Owned Parks Open Space
710 Church, Synagogue or Temple Commercial
711 Other Church Property Commercial
720 Private School School
721 Parochial School School
722 Special School School
730 Private Colleges School
740 Full Service Hospital Commercial
742 Clinic Commercial
760 Orphanages Commercial
770 Cemeteries (non‐profit) Open Space
771 Mortuaries and Funeral Homes Commercial
772 Cemetery Taxable (profit) Open Space
810 SBE valued Open Space ‐ Developed
811 Utility Water Company Open Space
812 Mutual Water Company Open Space
813 Cable TV Open Space
814 Radio and
TV Broadcast Site Open Space
815 Pipeline Right‐Of‐Way Open Space
816 Open Space Open Space
850 Right‐Of‐Way Open Space
851 Private Road Open Space ‐ Developed
860 Well Site Open Space
861 Tank Site Open Space
862 Springs and Other Water Sources Open Space
870 Rivers and Lakes Open Space
890 Parking Lots – Fee Open Space ‐ Developed
891 Parking Lots – No Fee Ope n Space ‐ Developed
Prepared by LWA Page E ‐ 6 1808000 LCMA ER Tables 2023.02.27.xlsx

ATTACHMENT E
Appendix E
Levee Capital and Maintenance Assessment (LCMA)
San Joaquin County Use Codes & Assessment Land Use Categories Use Code County  Description Land Use Category
/ Sub‐Category
892 Parking Garages Commercial
900 Vacant Federal Lands Open  Space
901 Federal Buildings Commercial
902 Military Installation Commercial
903 Miscellaneous Federal Property Commercial
910 Vacant State Lands Open Space
911 State Buildings Commercial
912 State Shops & Yards Commercial
913 State Parks and Other Recreational Facilities Open Space ‐ Developed 914 State Schools, Colleges School
916 Miscellaneous State Property Commercial
920 Vacant County Land Open Space
921 County Buildings Commercial
923 County Parks and Other Recreational Facilities Open Space 924 County Hospitals Co mmercial
925 Miscellaneous County Property Commercial
930 Vacant City Lands Open Space
931 City Buildings Commercial
932 City Shops and Yard Commercial
933 City Parks and Other Recreational Facilities Open Space 934 Municipal Utility Prop. (reservoirs, sewer pipeline) Open  Space ‐ Developed 935 Parking Lots – Garages Open Space ‐ Developed
936 Municipal Airports Commercial
937 Miscellaneous City Property Commercial
940 School District Properties Commercial
941 Fire Districts Commercial
942 Flood Control District Property Open Space
943 Water District Pr operty Open Space
944 Miscellaneous District property Open Space
950 Public Owned Land – Non‐ Taxable Open Space
951 Public Owned Land – Taxable [Section 11] Open Space 1000 Calaveras AG Agricultural
1001 Stanislaus AG Agricultural
1002 Blended Blended
Source: ParcelQuest,  San Joaquin County
Prepared by LWA Page E ‐ 7 1808000 LCMA ER Tables 2023.02.27.xlsx

ATTACHMENT E

San Joaquin Area
Flood Control Agency

Levee Construction and
Maintenance Assessment
(LCMA)

Appendix F
List of Parcels and FY 2023/24 Assessment Roll
(Under Separate Cover)

San Joaquin Area Flood Control Agency