24 HoursStockton Storm Drainage Basin
Maintenance Districts
Public Hearing for Fiscal Year 2023‐2024 Assessments
Municipal Utilities Department
June 13, 2023
Agenda Item No. 16.2
• Established to maintain the following six
Districts:
• Airport Gateway Center
• Arch Road Industrial
• Charter Way Industrial Site
• North Newcastle
• Stockton Airport Business Center
• Western Pacific Industrial Park
Storm Drainage Basin Maintenance Districts
Storm Drainage Basin Maintenance Districts
• Each Year Council Adopts the Following:
• Engineer’s Reports.
• Maximum Allowable Assessment.
• Annual Budget/Actual Assessment.
• Maintenance and operation of stormwater quality
(treatment) improvements.
• Assessment provides funding for:
• Operation, maintenance and preparation of
annual Engineer’s reports & tax rolls; legal review;
collection of assessments on San Joaquin County
property taxes and City administration.
Storm Drainage Basin Maintenance Districts
• Original Engineer’s Reports approved by landowner
ballot – allows for annual Cost of Living Adjustment.
• Approves annual maximum allowable but collect only
what is needed for anticipated operational costs.
• Allows for unanticipated emergencies –t o collect
only if necessary.
Maximum Allowable vs. Actual Assessments
• Varies by District as a result of:
• District size.
• Number of parcels within District.
• Basin to be maintained.
• Fiscal Year 2023‐24 Maximum Allowable Adjustment: +3.0 • Based on the greater of 3% or the annual San
Francisco‐Oakland‐San Jose Consumer Price Index.
• FY 2023‐2024 Actual assessments are to increase the
zone assessment amounts by 4.9% for Airport Gateway
Center and only the annexed portions of the Stockton
Airport Business Center Districts.
Annual Assessment
Fiscal Year 2023‐2024 Proposed Total Assessments
• Overrule all public hearing protests.
• Approve & adopt Fiscal Year 2023‐24 budgets for each
Maintenance District.
• Confirm & levy assessment for each District.
Recommended Actions