Cities Index.
Proposed Resolution

City Council and Concurrent Authorities
April 2, 2024

Document
Proposed Resolution
Meeting
April 2, 2024
Body
City Council and Concurrent Authorities
Original file
30 KB
Text extracted from the city's file for reading and search. Open the original on legistar1.granicus.com. That file is the official record.

Resolution No.

STOCKTON CITY COUNCIL
RESOLUTION APPROVING THE NOTICE OF EXEMPTION NO. NOE2-24, APPROVING THE PLANS AND SPECIFICATIONS, transferring FUNDs, AND AWARDING A CONSTRUCTION CONTRACT FOR THE GRUPE PARK PARKING LOT RESURFACING, PROJECT NO. WD22011 On January 25, 2024, the City Clerk of the City of Stockton opened, examined, and publicly declared the sealed proposals or bids offered for the Grupe Park Parking Lot Resurfacing, Project No. WD22011; and The project will resurface all three parking lots located within Grupe Park. The project scope includes parking lot resurfacing, removal and reconstruction of failed curbs, gutters and sidewalk segments, preservation of all existing survey monuments, installation of new pavement markers and striping, adjustment of existing utilities to pavement finished grade, and installation of Americans with Disabilities Act compliant curb ramps and parking signage; and Consolidated Engineering, Inc. is the lowest responsive bidder, in the amount of $385,623.75, and its bid is regular in all respects; and The project is categorically exempt from the requirements of the California Environmental Quality Act (CEQA) as specified under section 15301(c) of the CEQA Guidelines, because this is a discretionary project under the City’s jurisdiction and qualifies as a project which has been determined to not have a significant effect on the environment; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF STOCKTON, AS FOLLOWS:

1. The City Council approves the filing of Notice of Exemption No. NOE2-24 under CEQA for the Grupe Park Parking Lot Resurfacing, Project No. WD22011, a copy of which is attached as Exhibit 1 and incorporated by this reference.

2. The City Council approves the plans and specifications for the Grupe Park Parking Lot Resurfacing, Project No. WD22011.

3. The City Council approves the transfer of funds in the amount of $42,612.64 from the Lower Sacramento Road Bridge at White Slough Fence Replacement, Project No. WD22010, Account No. 4570-000-800007-300-301-30-45-000-000, to the Grupe Park Parking Lot Resurfacing, Project No. WD22011, Account No. 4570-000-800007-300-301-30-45-000-000.

4. The City Council awards a Construction Contract between the City of Stockton and Consolidated Engineering, Inc. in the amount of $385,623.75, and the City Manager is authorized and directed to execute same, a copy of which is attached as Exhibit 2 and incorporated by this reference.

5. The City Manager is hereby authorized to take whatever actions are necessary and appropriate to carry out the purpose and intent of this Resolution.

PASSED, APPROVED, and ADOPTED April 2, 2024 .

KEVIN J. LINCOLN II
Mayor of the City of Stockton
ATTEST:

ELIZA R. GARZA, CMC
City Clerk of the City of Stockton

← All documents from this meeting