ATTACHMENT A
City: Stockton
County: San Joaquin
Legistlative District: Assembly 13; Senate 5
Average PCI: 64
Year of PCI Measurement: 2021
PROJECT
NUMBER DESCRIPTION LOCATION CONSTRUCTION
START DATE
ESTIMATED
USEFUL LIFE
FUNDING
ALLOCATED
Local Street Resurfacing FY 23‐24 SB1 WD24003
Includes projects to provide approximately 45
centerline miles of various types of resurfacing
treatments
Street segments within City Council Districts 1, 2, 3, 4, 5, and 6 will be resurfaced. Final street segments will be reported upon completion in the expenditure report. City Council District map can be found at the following
link:http://stocktongov.com/files/councilmap.pdf
Anticipated Spring
2024 5‐7 years 4,550,000.00$
Sidewalk, Curb, and Gutter, and Curb Ramp Repairs FY 23‐24 SB1 WD24004 Includes removal and replacement of City
tree‐damaged curb, gutter, sidewalk, and
construction of curb ramps
Damaged curb, gutter, and sidewalk will be replaced,
and wheelchair ramps will be constructed within City
Council Districts 1, 2, 3, 4, 5, and 6. Final locations will be reported upon completion in the expenditure report.
City Council District map can be found at the following link:http://stocktongov.com/files/councilmap.pdf
Anticipated Spring
2024 50 years 1,550,000.00$
Streetlight Pole Replacement FY 23‐24 SB1 WD24006
Replace streetlight poles that are oxidized and
replace streetlight foundations with damaged
anchor bolts as needed
Streetlight poles and foundations will be replaced within City Council Districts 1, 2, 3, 4, 5, and 6. Final locations will be reported upon completion in the expenditure report.
City Council District map can be found at the following link:http://stocktongov.com/files/councilmap.pdf
Anticipated Spring
2024 50 years 1,095,909.00$
City Street Re‐Striping FY 23‐24 SB1 WD24009 Re‐stripe worn traffic striping along arterial and collector streets
Street segments within City Council Districts 1, 2, 3, 4, 5, and 6 will be re‐striped. Final street segments will be reported upon completion in the expenditure report. City Council District map can be found at the following
link:http://stocktongov.com/files/councilmap.pdf
Anticipated Spring
2024 5‐7 years 300,000.00$
WT23010
This project will maintain City bridges that are
not included in the federal Highway Bridge
Replacement and Rehabilitation (HBRR)
program
Bridges within City Council Districts 1, 2, 3, 4, 5, and 6 will be evaluated. Project locations will be reported upon completion in the expenditure report. City Council District map can be found at the following link:http://stocktongov.com/files/councilmap.pdf Anticipated Spring
2024 7‐10 years 500,000.00$
TOTAL SB1 RMRA FUNDING ALLOCATED FOR FY 2023‐2024 7,995,909.00$ ROAD MAINTENANCE AND REPAIR ACCOUNT (RMRA) PROJECT LIST FOR FISCAL YEAR 2023‐24 PROJECT NAME
Bridge Maintenance Program