EXHIBIT 2
205
RWCF Process Cleaning Services

Page 41 of 43 ends

EXHIBIT 2
206

INVITATION FOR SEALED BID (IFB)

RWCF PROCESS CLEANING SERIVCES

FOR THE CITY OF STOCKTON, CALIFORNIA
PUR 24-037
ADDENDUM No. 1 DATE: May 2, 2024
To All Potential Bidders:

A. This Addendum shall be considered part of the bid documents for the above-mentioned project as though it had been issued at the same time and shall be incorporated integrally therewith.

Where provisions of the following supplementary data differ from those of the original bid documents, this Amendment shall govern and take precedence. BIDDERS MUST SIGN THE ADDENDUM AND SUBMIT IT WITH THEIR BIDS.

B. Bidders are hereby notified that they shall make any necessary adjustments in their estimates as a result of this Addendum. It will be construed that each bidder’s bid is submitted with full knowledge of all modifications and supplemental data specified herein.

PLEASE NOTE THE FOLLOWING CHANGES AND CLARIFICATIONS TO PUR 24-037.

1. The Due Date has changed to Thursday, May 30, 2024 at 2:00 p.m. PST.

2. A second mandatory Job Walk has been scheduled for Tuesday, May 7, 2024 at 9:00 am PST at 2500 Navy Drive, Stockton, CA 95206.

Bidders who attended the first mandatory Job Walk on April 23, 2024, do not need to attend the second Job Walk.

3. The date for submission of questions has been extended to Friday, May 10, 2024 , at 2:00 p.m. PST. All questions must be submitted to [email protected].

4. The date for the City to respond to questions has been extended to Thursday, May 16, 2024

BIDDER MUST ACKNOWLEDGE THIS ADDENDUM BY SIGNING BELOW AND ATTACHING THE SIGNED ADDENDUM TO THE BID FORM:

Company Name
Contact Person
Signature
Date
Bids Due – Promptly by 2:00 P.M., Thursday, May 30, 2024, at the City Clerk’s Office at [email protected] .
----------------------------------City of Stockton Use Only below this line--------------------------------- Addendum acknowledged and signed? ( Procurement Specialist’s initials) Badger Daylighting Corp
Brenda S. Gordon, Sales & Marketing Operations Specialist May 7, 2024
Perso
n
Brenda S. Gordon, Sales
7 2024
RWCF Process Cleaning Services

Page 42 of 43 ends

EXHIBIT 2
207

INVITATION FOR SEALED BID (IFB)

REGIONAL WASTEWATER CONTROL FACILITY PROCESS CLEANING SERVICES

FOR THE CITY OF STOCKTON, CALIFORNIA
PUR 24-037
ADDENDUM No. 2 DATE: May 7, 2024
To All Potential Bidders:

A. This Addendum shall be considered part of the bid documents for the above-mentioned project as though it had been issued at the same time and shall be incorporated integrally therewith. Where provisions of the following supplementary data differ from those of the original bid documents, this Amendment shall govern and take precedence. BIDDERS MUST SIGN THE ADDENDUM AND SUBMIT IT WITH THEIR BIDS.

B. Bidders are hereby notified that they shall make any necessary adjustments in their estimates as a result of this Addendum. It will be construed that each bidder’s bid is submitted with full knowledge of all modifications and supplemental data specified herein.

PLEASE NOTE THE FOLLOWING CHANGES AND CLARIFICATIONS TO PUR 24-037.

1. Pursuant to Addendum 1:
a. The Due Date and Time remains on Thursday, May 30, 2024, at 2:00 p.m. PST. b. The date for submission of questions has been extended to Friday, May 10, 2024, at 2:00 p.m. PST. All questions must be submitted to [email protected]. c. The date for the City to respond to questions has been extended to Thursday, May 16, 2024

2. The original Cost for Services Price Page has been deleted and replaced with the attached Revised Cost for Services Price Page.

3. The original Bidder’s Checklist has been deleted and replaced with the attached Revised Bidder’s Checklist.

BIDDER MUST ACKNOWLEDGE THIS ADDENDUM BY SIGNING BELOW AND ATTACHING THE SIGNED ADDENDUM TO THE BID FORM:

Company Name
Contact Person
Signature
Date
Bids Due – Promptly by 2:00 P.M., Thursday, May 30, 2024, at the City Clerk’s Office at [email protected] .
----------------------------------City of Stockton Use Only below this line--------------------------------- Addendum acknowledged and signed? ( Procurement Specialist’s initials) Badger Daylighting Corp
May 8, 2024
Brenda S. Gordon, Sales & Marketing Operations Specialist May 8, 2024
Brenda S. Gordon, Sales & Market
RWCF Process Cleaning Services

Page 43 of 43 ends

EXHIBIT 2
208
City of Stockton
Legislation Text
File #: 24-0840, Version: 1

ADOPT A RESOLUTION TO FINALIZE A GRANT APPLICATION FOR A UNITED STATES BUREAU OF RECLAMATION WATERSMART: WATER AND ENERGY EFFICIENCY GRANT FOR FEDERAL FISCAL YEAR 2024

RECOMMENDATION
It is recommended that the City Council adopt a resolution to:

1. Authorize the City Manager to, sign, apply for, and accept a United States Bureau of Reclamation WaterSMART: Water and Energy Efficiency Grant for Federal FY 24 in the amount not-to-exceed of $4,273,925 on behalf of the City of Stockton.

2. Authorize the City Manager to finalize the grant application and all information submitted for consideration and to certify that the Municipal Utilities Department has and will provide $4,273,925 in non-federal cost-share funding and/or in-kind contributions specified in the grant funding plan of $8,547,850.

3. Authorize the City Manager to certify that the City has and will comply with all statutory and regulatory requirements related to any grant funds.

4. Authorize the City Manager to negotiate and execute a financial assistance agreement and any amendments thereto on behalf of the City of Stockton.

It is further recommended that the City Manager be authorized to take all necessary and appropriate actions to carry out the purpose and intent of this resolution.

Summary
The United States Bureau of Reclamation (USBR) Sustain and Manage America’s Resources for Tomorrow (WaterSMART): Water and Energy Efficiency Grant Program (USBR WaterSMART Program) supports projects that result in quantifiable and sustained water savings, implement renewable energy components, and support broader sustainability benefits.

On March 19, 2024, the City Council approved the Municipal Utilities Department (MUD) Advanced Meter Infrastructure and Meter Replacement project. This project will replace outdated manual and touch-read meters with Advanced Meter Infrastructure (AMI) at residential, commercial/institutional, and irrigation properties within the City’s water service area to support more efficient operation, management, and conservation of potable water supplies.

City of Stockton Printed on 9/5/2024Page 1 of 3
powered by Legistar™
209
File #: 24-0840, Version: 1
In addition, MUD submitted initial grant application information for the Advanced Meter Infrastructure and Meter Placement project - Phase I to the USBR Sustain and Manage America’s Resources for Tomorrow (WaterSMART): Water and Energy Efficiency Grant Program for $4,273,925 in possible grant funding.

On August 2, 2024, the USBR provided a letter wherein it stated that it anticipates awarding a grant to the City for the project and included information needed to complete the application. To receive the $4,273,925 in program grant funding, the City must provide information and complete several pre- award clearance items (Attachment A).

Staff recommends the City Council adopt a resolution authorizing the City Manager to take all actions, including signing, applying for, accepting, and finalizing the grant application and other documentation to receive $4,273,925 from the USBR WaterSMART: Water and Energy Efficiency Grant Program for Federal Fiscal Year 2024.

DISCUSSION
Background
The USBR WaterSMART Program provides a framework for Federal leadership and assistance to stretch and secure water supplies for future generations. The Program leverages Federal and non- Federal funding to work cooperatively with States, Tribes, and local entities as they plan for and implement actions to increase water supply sustainability through investments in existing infrastructure and attention to local water conflicts.

The USBR Water and Energy Efficiency Grants
provide financial assistance to support projects that result in quantifiable and sustained water savings, implement renewable energy components, and support broader sustainability benefits.

The City’s AMI and Meter Replacement project qualifies for the grant because it will save an estimated 1,003 acre-feet per year (AFY) of potable water, which will result in an estimated energy savings of 330,589 kilowatt-hours (kWh). The AMI and Meter Replacement project will improve water management with real-time data, early leak detection, and remotely read water meters.

The City’s AMI and Meter Replacement project consists of the purchase and installation of meters, reading equipment, software, technical support, data transmission, and receiving systems. The City will replace its existing manual meter-reading system with automated AMI equipment and software.

The transition to a fully scalable AMI system will improve water conservation, energy efficiency and contribute to the sustainability of the San Joaquin River and Eastern San Joaquin Subbasin, thus supporting USBR’s water conservation goals.

Present Situation
Water demand in the City of Stockton is expected to increase by approximately 39 percent by 2045, according to the City of Stockton 2020 Urban Water Management Plan. By replacing its existing manual meter reading system with AMI, the City will reduce future water demands by improving water conservation and efficiency.

City of Stockton Printed on 9/5/2024Page 2 of 3
powered by Legistar™
210
File #: 24-0840, Version: 1
If approved by the City Council, MUD staff, at the direction of the City Manager, will complete the grant application and provide all documentation needed to receive $4,273,925 in grant funding from the USBR WaterSMART Program (Attachment A). The grant funding will be used to help fund the Advanced Meter Infrastructure and Meter Placement project - Phase I.

FINANCIAL SUMMARY
The Advanced Meter Infrastructure and Meter Placement project - Phase I (UH22001) is eligible to receive $4,273,925 in USBR WaterSMART Program grant funding. If funded, the required non- federal cost share of at least 50 percent will consist of $4,273,925 in MUD funding, totaling a minimum project cost of $8,547,850. The total approved project budget is $17,220,369.72.

Grant funding for this project is expected to be available in FY 2025 through FY 2027. Financial participation in other state and federal grant activities will be reviewed by the Department as additional opportunities become available.

There is no impact to the General Fund, or any other unrestricted fund, from this action.

Attachment A - WEEG-008 City of Stockton
City of Stockton Printed on 9/5/2024Page 3 of 3
powered by Legistar™
211
84-27814

1.3.11 VIA ELECTRONIC MAIL ONLY
City of Stockton
Attn: Danny Trejo
425 N. El Dorado Street, 2nd Floor
Stockton, CA 95202-1951
Subject: Funding Opportunity No. R24AS00052
WaterSMART Grants: Water and Energy
Efficiency Grants for Fiscal Year 2024 Application Review Status, Your Application Advanced Meter Infrastructure and Meter Replacement - Phase I De
ar Mr. Trejo:

The Bureau of Reclamation (Reclamation) is pleased to inform you that your application for WaterSMART Grants: Water and Energy Efficiency Grants funding was among those receiving the highest ratings and is now being considered for award of a financial assistance agreement for fiscal year 2024.

Your application included a request for $4273925
Advanced
Meter Infrastructure and Meter Replacement - Phase I
Federal funds in the amount of $4273925 for your proposed project.

All new financial assistance awards for infrastructure projects must meet Buy America requirements. See OMB Memorandum M-22-11 at https://www.whitehouse.gov/wp- content/uploads/2022/04/M-22-11.pdf
Domestic Sourcing Guidance at https://www.doi.gov/grants/buyamerica for further details.

In working with you to develop your financial assistance agreement, Reclamation will closely review the activities outlined in your proposal to ensure that all activities are eligible for funding and that the proposed costs are allowable under financial assistance regulations. If some costs or activities are determined to be ineligible or unallowable, Reclamation will work with you to refine the scope of work and budget for the project.

In the coming months, Reclamation will work with you to gather the information needed to enter into a financial assistance agreement. Please note that this letter is not a final commitment of funding and all pre-award clearances and approvals must be obtained as described in Section E.2.5 of the Funding Opportunity. In addition, Reclamation must have sufficient evidence prior to award that non-Federal cost share will be available. The final funding amount may be adjusted if necessary.

ATTACHMENT A
212
Federal statute (42 U.S.C. 10364(a)(3)(B)) requires that before any funds are awarded, you agree not to use any water savings resulting from your proposed project to increase your total irrigated acreage or to otherwise increase the consumptive use of water in your operations. This requirement, which was discussed in Section F.2.4 of the Funding Opportunity, will be included in the financial assistance agreement for your project.

Please be advised that your application has been ranked, in part, based on your description of the expected benefits of your project. Selection criteria placed an emphasis on conserving and using water more efficiently; increasing the production of hydropower; mitigating conflict risk in areas at a high risk of future water conflict; and accomplishing other benefits that contribute to water supply reliability in the western United States.

In order to demonstrate the success of the program and to provide a guide for future applicants, Reclamation will post copies of all successful Water and Energy Efficiency Grants applications While this generally does not raise any issues,
Reclamation finds it prudent to provide successful grant applicants with an opportunity to redact any sensitive information from their proposals prior to posting them on our website. As a rule, Reclamation removes the SF-424s; however, if there are any other items you would like to request be redacted, please notify us by sending an email to [email protected] no later than Friday, August 23, 2024. If Reclamation does not hear from you by this date, Reclamation will assume that there are no objections to posting the full application.

Reclamation will hold a post-selection webinar to discuss the process for development of financial assistance agreements and next steps with you and all other selected applicants.

Webinar details will be emailed to you in the coming days. Thank you for your interest and participation in the WaterSMART Program. The success of the WaterSMART Program depends on collaboration with partners to improve water management. We look forward to working with you.

Sincerely,
Ne
d Weakland
Grants Officer

ATTACHMENT A
213
Resolution No.

STOCKTON CITY COUNCIL

RESOLUTION AUTHORIZING THE CITY MANAGER TO FINALIZE A GRANT

APPLICATION FOR A UNITED STATES BUREAU OF RECLAMATION
WATERSMART: WATER AND ENERGY EFFICIENCY GRANT FOR FEDERAL FISCAL YEAR 2024

The United States Bureau of Reclamation (USBR) Sustain and Manage America’s Resources for Tomorrow (WaterSMART) Program provides a framework for Federal leadership and assistance to stretch and secure water supplies for future generations ; and

Through the Water and Energy Efficiency grants, USBR provides financial assistance to support projects that result in quantifiable and sustained water savings, implement renewable energy components, and support broader sustainability benefits ; and

The City of Stockton Municipal Utilities Department (MUD) has provided initial grant application information f or the Advanced Meter Infrastructure and M eter Replacement Project – Phase I (AMI) to support the efficient operation, management, and conservation of water supplies in the City of Stockton water service area; and

This project will replace outdated manual and touch read meters with AMI at residential, commercial/institutional, and irrigation properties to improve water management with real-time data, early leak detec tion, and remotely read water meters ; and

The MUD is eligible to apply for federal grant funding under the US BR WaterSMART: Water and Energy Efficiency Grants for Federal Fiscal Year (FY) 2024; now therefore,

BE IT RESOLVED BY THE CITY COUNCIL OF THE CI TY OF STOCKTON, AS FOLLOWS:

1. The City Manager, or designee, is hereby authorized, on behalf of the City of Stockton , to sign, apply for, and accept a United States Bureau of Reclamation WaterSMART: Water and Energy Efficiency Grant for Federal FY 2024 in the amount not- to-exceed of $4,273,925.

2. The City Manager, or designee, is hereby authorized to finalize the United States Bureau of Reclamation WaterSMART grant application and all information submitted for consideration and is further authorized to certify the MUD has and will 214
provide $4,273,925 in non -federal cost -share funding and/or in -kind contributions specified in the grant funding plan of $8,547,850.

3. The City Manager, or designee, is hereby authorized to certify that the City has and will comply with all statutory and regulatory requirements related to any grant funds.

4. The City Manager, or designee, is hereby authorized to negotiate and execute a financial assistance agreement on behalf of the City of Stockton with the United States Bureau of Reclamation WaterSMART Program and any amendments thereto.

5. The City Manager, or designee, is hereby authorized to take all necessary and appropriate actions to carry out the purpose and intent of this Resolution.

PASSED, APPROVED, and ADOPTED September 10, 2024 .

KEVIN J. LINCOLN II
Mayor of the City of Stockton
ATTEST:

KATHERINE ROLAND, CMC, CPMC
Interim City Clerk of the City of Stockton

215
City of Stockton
Legislation Text
File #: 24-0851, Version: 1

AWARD A PROFESSIONAL SERVICES AGREEMENT TO GATEWAY PACIFIC CONTRACTORS, INC. TO DESIGN AND CONSTRUCT THE DELTA WATER TREATMENT PLANT GROUNDWATER

RECHARGE BASIN PROJECT

RECOMMENDATION
It is recommended that the City Council adopt a resolution to:

1. Approve findings pursuant to Stockton Municipal Code section 3.68.070 in support of an exception to the competitive bidding process.

2. Award a Professional Services Agreement to Gateway Pacific Contractors, Inc. of Sacramento, CA, in the not-to-exceed amount of $11,483,248 to design and construct the Delta Water Treatment Plant Groundwater Recharge Basin Project (UH21005) and associated infrastructure.

It is also recommended that the City Manager be authorized to take all appropriate and necessary actions to carry out the purpose and intent of this resolution.

Summary
The Municipal Utilities Department (MUD) investigated the potential of groundwater recharge at the Delta Water Treatment Plant (DWTP) as part of the City conjunctive water management program.

The program combines the use of surface water and groundwater in a coordinated way to ensure a reliable and sustainable water supply, particularly in dry years or during extended droughts.

To further investigate the potential for groundwater recharge at the DWTP, the MUD contracted with Geosyntec Inc. to conduct a geotechnical investigation and preparation of a hydrogeologic characterization report on a 70-acre field at the DWTP site. The report’s findings confirmed that the soil characteristics support the feasibility of constructing a groundwater recharge project at the DWTP.

Staff recommends the City Council adopt a resolution awarding a Professional Services Agreement to Gateway Pacific Contractors, Inc. of Sacramento, CA, in the not-to-exceed amount of $11, 483,248, to design and construct the Delta Water Treatment Plant Groundwater Recharge Basin Project (UH21005).

DISCUSSION
City of Stockton Printed on 9/5/2024Page 1 of 4
powered by Legistar™
216
File #: 24-0851, Version: 1
Background
In 2012, the MUD dedicated the Delta Water Supply Project (DWSP), a key component of the City’s conjunctive use program and, to help balance groundwater levels in the Eastern San Joaquin Groundwater Subbasin. The DWSP provides surface water supplies to nearly 200,000 customers in north Stockton. The project included a river diversion and pumping station to convey water to the 30- million gallon per day DWTP located along Lower Sacramento Road, north of Eight Mile Road between the City of Stockton and the City of Lodi.

The DWSP was designed, in part, to protect the groundwater basin through conjunctive management of water resources and to improve the City’s water supply reliability portfolio. The construction of groundwater recharge basins adjacent to the treatment plant will increase the City conjunctive management capacity. When complete, the project will allow the City to directly recharge the groundwater basin using water from sources including Water Right Permit 21176, contract supplies from Woodbridge Irrigation District (WID), and possibly stormwater runoff from the City of Lodi. Water recharged into the groundwater basin can be stored and pumped during dry years or extended droughts. The basins will also help to balance groundwater levels in the critically over-drafted Eastern San Joaquin Groundwater Subbasin to help meet the Region’s Sustainable Groundwater Management Act requirements.

On June 14, 2022, by Resolution 2022-06-14-1208, the City Council awarded a professional services agreement to Geosyntec Inc. to perform geotechnical investigations and hydrogeologic characterization of the soil profiles at the DWTP site. Geosyntec Inc. completed the subsurface investigation in December 2023. The study confirmed the feasibility of constructing a groundwater recharge project at the DWTP.

Present Situation
On February 2, 2024, the City advertised an RFP to design and construct groundwater recharge basins at the DWTP. On April 4, 2024, four (4) proposals were received from the following firms:

Consultant Location Price
Gateway Pacific Contractors, Inc. Sacramento, CA $11,483,248 George Reed Inc. Modesto, CA $21,380,290
Goodfellow Bros. Lodi, CA $24,861,000
Mountain Cascade, Inc. Livermore, CA $20,534,862
Engineering Estimate with 10% Contingency $11,377,631
A selection committee comprised of staff and consultants evaluated and ranked all proposals based on each firm’s understanding of the work, experience with similar work, qualifications of proposed team, project approach, and cost. Gateway Pacific Contractors, Inc. met or exceeded the requirements and was found to be the most qualified based on the RFP criteria and their proposal (Attachment A). Furthermore, Gateway Pacific Contractors, Inc. was the only firm with specific experience in the design and construction of groundwater recharge basins in California.

City of Stockton Printed on 9/5/2024Page 2 of 4
powered by Legistar™
217
File #: 24-0851, Version: 1
Findings
Pursuant to Stockton Municipal Code section 3.68.070, the City Council may approve findings which support and justify an exception to the competitive bidding process. The following findings support such an exception:

1. A strict cost-competitive basis for the selection of professional services may lower the quality and thoroughness of the services provided.

2. Use of the RFP process is appropriate for this Professional Services Agreement because it relies on the evaluation of professional qualifications and performance as the basis for the selection of a vendor, which is a typical practice for this type of work. Use of these criteria resulted in the selection of a vendor with specific experience in design and construction of groundwater recharge basins in California.

3. Considering the size, complexity, and schedule requirements of the project, the City does not have sufficient staff resources nor the expertise to design and construct a project of this size.

4. The City negotiated the contract following a regular Request for Proposal process in accordance with SMC section 3.68.070.A.3.

Staff recommends that the City Council adopt a resolution to award a Professional Services Agreement to Gateway Pacific Contractors, Inc. in the not-to-exceed amount of $11,483,248 to design and construct the Delta Water Treatment Plant Groundwater Recharge Basin Project (Exhibit 1 to the Resolution).

LOCAL EMPLOYMENT ORDINANCE
On September 1, 2009, the City Council adopted a Local Employment Ordinance requiring that 50 percent of the workforce on public works projects of at least $100,000 reside in the City of Stockton.

The contract amount for this project is more than $100,000 and subject to the Local Employment Ordinance.

COMMUNITY WORKFORCE AND TRAINING AGREEMENT
On July 26, 2016, the City Council adopted a Community Workforce and Training Agreement (CWTA). The CWTA became effective on August 25, 2016, and applies to all Public Works projects over $1,000,000 that are bid after the effective date. This project is subject to the requirements of the CWTA.

FINANCIAL SUMMARY
In 2021, the MUD applied for grant funding for project feasibility and future construction under the Department of Water Resources Sustainable Groundwater Management Act (SGMA) Round 1 grant program and the Integrated Regional Water Management Program. The project will be granted $300,000 and $2,000,000 from these programs, respectively.

City of Stockton Printed on 9/5/2024Page 3 of 4
powered by Legistar™
218
File #: 24-0851, Version: 1
There are sufficient funds available in the Water Capital Improvement Projects Fund under Project Number UH21005 for the design, permitting, and construction work. The remaining funds will be budgeted in FY 2025-26 as part of the annual budget development process.

There is no impact to the General Fund, or any other unrestricted funds, from this action.

Attachment A - Proposal
City of Stockton Printed on 9/5/2024Page 4 of 4
powered by Legistar™
219
PROPOSAL FOR:

CITY OF STOCKTON DESIGN BUILD SERVICES FOR THE DELTA WATER TREATMENT PLANT GROUNDWATER RECHARGE BASIN – PUR 24-016

CITY OF STOCKTON

CITY HALL

OFFICE OF THE CITY CLERK
425 NORTH EL DORADO STREET
STOCKTON, CA 95202
GATEWAY PACIFIC CONTRACTORS, INC.
8055 FREEPORT BLVD.

SACRAMENTO, CA 95832
916.665.4100 | GATEWAYPACIFIC.COM
APRIL 4, 2024

ATTACHMENT A
220
8055 Freeport Blvd | Sacramento, CA 95832 | 916.665.4100 | gatewaypacific.com

TABLE OF CONTENTS
Cover Letter 1

4.5.2 Qualifications Information 5

4.5.3 Technical Proposal 12

4.5.4 Fee Proposal (under separate cover)

4.5.6 References 33

4.5.7 Financial Statement 36
Appendix A: Team Resumes
Appendix B: Gateway Pacific Licensing and Insurance Requirements, Bondability and Bank Letters
Appendix C: Detailed Scope of Work
Appendix D: Client Reference Letters
Example Work Product for the 2019 Stockton East Water District Percolation Basin Project provided under separate cover.

ATTACHMENT A
221
8055 Freeport Blvd | Sacramento, CA 95832 | 916.665.4100 | gatewaypacific.com Gateway Pacific Contractors, Inc.
8055 Freeport Blvd
Sacramento, CA 95832
April 4, 2024
City of Stockton
Office of the City Clerk
City Hall
425 North El Dorado Street
Stockton, CA 95202
Subject Proposal for the City of Stockton Design Build Services for the Delta Water Treatment Plant Groundwater Recharge Basin
Dear Ms. Garza and Members of the Selection Committee:

Gateway Pacific Contractors, Inc. and NEXGEN Utility Management, Inc. are pleased to submit this Proposal to provide design-build services for the Delta Water Treatment Plant groundwater recharge basin for the City of Stockton.

We understand the City of Stockton is seeking a reliable and cost -effective solution to maximize the beneficial use of the City’s full groundwater allotment to optimize the water supply reliability and raise groundwater levels in the Eastern San Joaquin Subbasin.

We have assembled a design -build team for the Delta Water Treatment Plant Groundwater Recharge Basin that has the design -build experience to provide you with an optimal project—on schedule and within budget. Our design -build team has maintained a full workforce in Northern California since 1987 with local offices in Northern California.

This Gateway Pacific Contractors and NEXGEN Utility Management team, with offices exclusively in California, includes the same design -build partners who have successfully partnered on recharge for the City of Colusa and the Stockton East Water District . These projects have included building 60 + acre basins, larger (48 inch +) pipes and automatic valves to recharge groundwater similar to this project.

As evidenced by the enclosed resumes, most of our expert team members have had many years of experience with the engineering and construction of municipal water projects. We know that smaller, specialized, and nimble design and construction teams are able to provide more innovative design, more highly responsive service, and more project capacity within the budget. The key to this success is maintaining dir ect involvement of the team’s most experienced staff throughout the project.

ATTACHMENT A
222
8055 Freeport Blvd | Sacramento, CA 95832 | 916.665.4100 | gatewaypacific.com The team brings together a highly qualified group of professionals who are able to provide the technical expertise this project requires, while delivering excellent service to the City.

Included in our proposal are reference letters from current and past clients that attest to the level of service and attention we provide throughout the life of a project. We encourage you to call references and ask about the team’s work quality and attention to client needs.

Contact information for key team members is included below:

Key Team Member Company/Address E-Mail Phone
Evan Lundin *
Design/Build
Management Oversight
Gateway Pacific
Contractors, Inc.
8055 Freeport Blvd.

Sacramento, CA 95832
[email protected] (916) 417-2314
Dan Rich, P.E.

Design Project Manager
NEXGEN Utility
Management, Inc.
4010 Lennane Dr.

Sacramento, CA 95834
[email protected] (916) 835-3899
Gary A. Bechtel
Design/Build
Construction
Management Oversight
Gateway Pacific
Contractors, Inc.
8055 Freeport Blvd.

Sacramento, CA 95832
[email protected] (916) 417-4213
Jay Hall
Project Manager &
QA/QC
Gateway Pacific
Contractors, Inc.
8055 Freeport Blvd.

Sacramento, CA 95832
[email protected] (916) 417-0345
Gary Heim
On Site Project
Manager/Superintendent
Gateway Pacific
Contractors, Inc.
8055 Freeport Blvd.

Sacramento, CA 95832
[email protected] (916) 417-2276
“In performing their duties, Gateway Pacific Contractors…showed the highest degree of professionalism, skill and expertise in the construction of a very complex and politically sensitive project. This project was a critical project for the City of Anaheim as a key component in our water system and was situated in a very challenging location that required a great deal of sensitivity to the public and high degree of responsiveness from the contractor. Gateway Pacific performed exceptionally to these demands. The project was completed ahead of schedule and with virtually no net change orders due to the expertise, experience and cooperativeness of the team at Gateway Pacific.”
- Bill Moorhead, PE, Principal Engineer, City of Anaheim

ATTACHMENT A
223
8055 Freeport Blvd | Sacramento, CA 95832 | 916.665.4100 | gatewaypacific.com Matt Moyneur, P.E., G.E.

Geotechnical Services
Raney Geotechnical,
Inc.
3140 Beacon Blvd.

West Sacramento, CA
95691
[email protected] (916) 371-0434
Jeremy Pollet, P.E.

Electrical Design and
Controls
ControlPoint
Engineering, Inc.
3941 Park Drive, Unit 20
El Dorado Hills, CA
95762
[email protected] (916) 817-1376
Scott Redding, PLA
Landscape Planning
Helix Environmental
Planning
1180 Iron Point Road,
Suite 130
Folsom, CA 95630
[email protected] (916) 435-1202 x
109
Lesley Owning
CEQA Permitting
Helix Environmental
Planning
1180 Iron Point Road,
Suite 130
Folsom, CA 95630
[email protected] (916) 365-8710
Matt Rodgers, P.E.

Surveying
MRPE, Inc.
2530 J Street, Suite 330
Sacramento, CA 95816
[email protected] (916) 272-8433
* Evan Lundin is the overall main point of contact for our Team.

Signed acknowledgement of the receipt of the addendums is attached to this cover letter along with the Non Collusion Affidavit.

Thank you for your consideration of our team and firm. We look forward to discussing any questions or comments you have about this Proposal. You can contact me directly any time at (916) 417-2314 or email me at [email protected].

Yours sincerely,
Evan Lundin
President
(916) 417-2314 | [email protected] | https://gatewaypacific.com Main Office Address: 8055 Freeport Blvd, Sacramento, CA 95832

ATTACHMENT A
224

ATTACHMENT A
225

ATTACHMENT A
226

ATTACHMENT A
227
1 (Version 9.22.21)

REQUEST FOR PROPOSAL (RFP)

DESIGN BUILD SERVICES FOR THE DELTA WATER TREATMENT PLANT

GROUNDWATER RECHARGE BASIN

FOR THE CITY OF STOCKTON, CALIFORNIA
(PUR24-016)
ADDENDUM No. 1 DATE: 02/02/2024
To All Potential Proponents:

A. This Addendum shall be considered part of the proposal documents for the above-mentioned project as though it had been issued at the same time and shall be incorporated integrally therewith.

Where provisions of the following supplementary data differ from those of the original proposal documents, this Addendum shall govern and take precedence. PROPONENTS MUST SIGN THE ADDENDUM AND SUBMIT IT WITH THEIR PROPOSALS.

B. Proponents are hereby notified that they shall make any necessary adjustments in their estimates as a result of this Addendum. It will be construed that each Proponent’s Proposal is submitted with full knowledge of all modifications and supplemental data specified herein.

PLEASE NOTE THE FOLLOWING QUESTIONS/ANSWERS/CHANGES TO
(PUR 24-016).

Update to Solicitation
Adding language:

1. COMMUNITY WORKFORCE AND TRAINING AGREEMENT
On July 26, 2016, City Council adopted a Community Workforce and Training Agreement (CWTA). The CWTA became effective on August 25, 2016, and applies to all Public Works projects over $1,000,000 that are bid after the effective date. This project is subject to the requirements of the CWTA.

PROPONENT MUST ACKNOWLEDGE THIS ADDENDUM BY SIGNING BELOW AND ATTACHING THE SIGNED ADDENDUM TO THE PROPOSAL:

Company Name
Contact Person
Signature
Date
Proposals Due – Promptly by 2:00 P.M., Thursday, March 28, 2024 at the City Clerk’s Office.

Gateway Pacific Contractors & Nexgen Utilities Management Evan Lundin
February 5, 2024

ATTACHMENT A
228
2 (Version 9.22.21)

----------------------------------City of Stockton Use Only below this line---------------------------------

Addendum acknowledged and signed? ( Procurement Specialist’s initials)

ATTACHMENT A
229
1 (Version 9.22.21)

REQUEST FOR PROPOSAL (RFP)

DESIGN BUILD SERVICES FOR THE DELTA WATER TREATMENT PLANT GROUNDWATER

RECHARGE BASIN

FOR THE CITY OF STOCKTON, CALIFORNIA
(PUR24-016)

ADDENDUM
No. 2 DATE: 02/21/2024
To All Potential Proponents:

A. This Adden
dum shall be considered part of the proposal documents for the above-mentioned project as though it had been issued at the same time and shall be incorporated integrally therewith.

Where provisions of the following supplementary data differ from those of the original proposal documents, this Addendum shall govern and take precedence. PROPONENTS MUST SIGN THE ADDENDUM AND SUBMIT IT WITH THEIR PROPOSALS.

B. Proponents are hereby no tified that they s hall make a ny necessary adjustments in the ir estimates as a result of this Addendum. It will be construed that each Proponent’s Proposal is submitted with full knowledge of all modifications and supplemental data specified herein.

PLEASE NOTE THE FOLLOWING QUESTIONS/ANSWERS/CHANGES TO
(PUR 24-016).

Update
to Solicitation
Gener
al Instructions Update 4.3
Amending Submission or Proposals, 4.3.1, page 17.

One electronic copy/USB and 3 paper copies of the Proposal must be received by Thursday, March 28, 2024, no later than 2:00 p.m. local time (Submission Due Date and Time). The entire Proposal (electronic/USB and 3 paper copies) should be placed in a package (or set of packages marked 1 of _, 2 of _, etc.), labeled on the outside with the Respondent’s name, address, telephone number, Proposal title, and Submission Due Date and Time. The cost proposal shall be placed in a separate sealed envelope, similarly labeled, as the Fee/Cost Proposal. Fee/Cost proposals will be not be opened until after the Selection Committee has initially scored the Proposals.

PROPONENT MUS T A CKNOWLEDGE T HIS A DDENDUM BY S IGNING BE LOW AND ATTACHING THE SIGNED ADDENDUM TO THE PROPOSAL:

Company Nam
e Gateway Pacific Contractors & Nexgen Utilities Management Contact Person
Signature
Date
Proposals Due – Promptly by 2:00 P.M., Thursday, March 28, 2024 at the City Clerk’s February 22, 2024
Evan Lundin

ATTACHMENT A
230
2 (Version 9.22.21)
Office.

----------------------------------City of Stockton Use Only below this line---------------------------------

Addendum acknowledged and signed? ( Procurement Specialist’s initials)

ATTACHMENT A
231
2 (Version 9.22.21)

PROPONENT MUST A CKNOWLEDGE T HIS A DDENDUM BY S IGNING BELOW AND ATTACHING THE SIGNED ADDENDUM TO THE PROPOSAL:

Company Name
Contact Person
Signature
Date
Proposals Due – Promptly by 2:00 P.M., Thursday, March 28, 2024 at the City Clerk’s Office.
----------------------------------City of Stockton Use Only below this line--------------------------------- Addendum acknowledged and signed? ( Procurement Specialist’s initials) Gateway Pacific Contractors & Nexgen Utilities Management February 27, 2024
Evan Lundin

ATTACHMENT A
232

REVISED APPENDIX I
Proponent’s Fee Schedule

PROPONENT MUST A CKNOWLEDGE T HIS A DDENDUM BY S IGNING BELOW AND ATTACHING THE SIGNED ADDENDUM TO THE PROPOSAL:

Company Name
Contact Person
Signature
Date
Proposals Due – Promptly by 2:00 P.M., Thursday, March 28, 2024 at the City Clerk’s Office.

Description Total Cost

1. Engineering Price
Provi
de a task breakdown of all costs
associated with the fee provided.
$

2. Construction management fee
Percentage of Cost
Provi
de a task breakdown of all costs
associated with the fee provided.
$
%

3. Construction Price
Provi
de a task breakdown of all costs
associated with the fee provided.
$

4. Gran
d Total $
Gateway Pacific Contractors/Nexgen Utilities Management Evan Lundin
March 16, 2024

ATTACHMENT A
233

4.5.2 QUALIFICATIONS INFORMATION

5 The following sections outline our Project Team qualifications.

Design-Build Team Bios
Gateway Pacific Contractors, Inc.

Established in 1987 , Gateway Pacific Contractors, Inc. (GPC) was founded on a cornerstone philosophy of satisfying our clients' needs by creating a safe workplace, exceptional quality, commitment to schedule and a fair price. GPC specializes in the construction of water and wastewater projects in the western United States.

GPC is a true general contractor. We self -perform the vast majority of our own projects with our own craftspeople and supervisors. On a typical project this might include the earthwork, structural concrete , and complete mechanical , among other specialties. This self-performing approach allows us better overall control of our projects, keeps us competitive and offers the broadest base of opportunity for our staff.

GPC’s main office is and has been in Sacramento for over 25 years. We have a Skilled Labor Work Force in Northern California ranging from 20 to 60 workers, and have completed projects nearby in East Stockton, Biggs, Gridley, Vacaville, Modesto, and Livermore.

Gateway Pacific holds a State of California Contractors License (#517988), Class A & B.

NEXGEN Utility Management, Inc.

NEXGEN Utility Management, Inc . is a privately held
Minority Owned Small Business Enterprise
headquartered in Sacramento, CA. NEXGEN was
established in 2005 and specializes in the permitting,
planning, design, and construction oversight of water
and wastewater systems for Central Valley cities.

We have a combined staff of over 20 specialists,
including licensed professional engineers (P.E.s), CAD
and GIS specialists, project managers, and software developers. NEXGEN’s business philosophy is to provide quality engineering services at reasonable rates. By focusing on quality engineering and customer service, we have grown and thrived by reputation on repeat business.

ATTACHMENT A
234

4.5.2 QUALIFICATIONS INFORMATION

6 Design-Build Team Organization

DESIGN SERVICES

DESIGN BUILD TEAM LEAD

PROJECT OVERSIGHT AND MANAGEMENT
Evan Lundin

GATEWAY PACIFIC CONTRACTORS

CONSTRUCTION SURVEYING
Matt Rodgers
MRPE
SITE | CIVIL DESIGN | PERMITTING

ENGINEERING PM
Dan Rich, P.E.

HYDRAULICS
Melissa Lee, P.E. & Dan Rich, P.E.

CIVIL DESIGN
Mark Cocke, P.E., Joe DiGiorgio, P.E.,
Angelica Ortiz, EIT

PERMITTING
Melissa Lee, P.E.

PROJECT SUPERINTENDENT
Gary Heim

GATEWAY PACIFIC CONTRACTORS

GEOTECHNICAL ENGINEERING
Matt Moyneur. P.E., G.E.

RANEY GEOTECHNICAL

CONSTRUCTION MANAGEMENT
Gary Bechtel

GATEWAY PACIFIC CONTRACTORS

CONSTRUCTION SERVICES

ELECTRICAL

ENGINEERING
Jeremy Pollet, P.E.

Jason Foster
Matt Boring

CONTROLPOINT

LANDSCAPE

ARCHITECTURE &
CEQA
Scott Redding, PLA
Lesley Owning
HELIX

ENVIRONMENTAL

PLANNING

GATEWAY PACIFIC PROJECT MANAGER &
QA/QC
Jay Hall

ATTACHMENT A
235

4.5.2 QUALIFICATIONS INFORMATION

7 Key Team Members
Summaries of our individual team member qualifications and experience are included below. Complete resumes for key team members can be found in Appendix A of this proposal.

Gateway Pacific Contractors
Evan Lundin
Design/Build Management Oversight
Evan will be the overall point of contact for the City for the project and will provide final QA/QC on design and construction. Evan has over 30 years of experience in cost estimating and managing overall operations and resources of projects, as well as reviewing plans to reduce the overall potential for change orders, conflicts, and claims during the construction phase. Evan worked closely with NEXGEN on the City of Colusa Recycled Water Perc Basin and the Stockton East Water District (SEWD) Raw Water De livery Reliability Improvements project (another groundwater recharge basin project).

Gary Bechtel
Design/Build Construction Management Oversight
Gary will be the overall project manager for the construction portion of the project. Gary has 35 years of experience in engineering and construction management. He has managed over $800 million in successful water and wastewater treatment, storage and transmission projects for Gateway Pacific. He was part of the successful team for the projects for Colusa and SEWD with NEXGEN.

Jay Hall
Project Manager
Jay has over 20 years of experience with planning, organizing, and managing the construction and rehabilitation of a wide range or projects involving public infrastructure for water and sewer, public utility operations, and base facilities. Jay will create budgets and schedules and monitor expenses and progress for the project. Working closely with project superintendents and foremen, he will ensure that all work is performed efficiently, safely, and in strict compliance with building codes and regulation s. Jay will remain in constant communication with the City and Construction Managers to assure that they remain well informed and that expectations are met.

ATTACHMENT A
236

4.5.2 QUALIFICATIONS INFORMATION

8 Gary Heim
On-Site Project Manager/Superintendent
As a project superintendent, Gary is responsible for completing each project on time and under budget. His daily duties will include planning, workforce management, coordinating subcontractors and suppliers, and interaction with the City’s representatives. Other duties will include value engineering, updating CMP schedules, and weekly cost accounting.

NEXGEN Utility Management
Dan Rich, P.E.

Engineering Project Manager
Dan will oversee the progress of design work to meet City objectives in terms of content, schedule, and overall quality of service. As a principal of the firm, he is in a position to ensure application and commitment of NEXGEN personnel, its resources, and subcontractors throughout the project. Dan has over 30 years of experience in planning, modeling, designing, and engineering support for large water improvement projects. Dan has served as project and design manager for recharge projects for the City of Colusa treatment facilities (60 MGal, $10 million construction) and the Stockton East Water District (60 acres, $6 million).

Mark Cocke, P.E.

Senior Project Engineer
Over Mark’s 40 -year career he has been the technical lead on more than a dozen water recharge projects across California. Mark’s designs have recharged over 100,000 acre feet of water per year. Depending on the unique geology of the site, he has permitted and designed percolation basins, lateral drains, and vertical well systems.

Joe DiGiorgio, P.E.

Senior Project Engineer
Joe has more than 35 years of experience as Project Engineer, Project Manager, and Construction Manager for water and wastewater treatment and conveyance projects. He also has extensive experience providing design services during construction, bypass pumping plans, and coordinating with construction crews and inspection staff.

Melissa Lee, P.E.

Senior Project Engineer
Melissa has 20 years of permitting, planning, hydraulic modeling, and design experience in a wide-range of water and wastewater projects. Melissa will assist with permitting design, and engineering support during construction.

ATTACHMENT A
237

4.5.2 QUALIFICATIONS INFORMATION

9 Angelica Ortiz, EIT
Project Engineer
Angelica has provided design experience on multiple water and wastewater projects including: the city of Wheatland’s regional wastewater project, City of Auburn treatment plant, and the City of Colusa recycled water recharge program.

Design Subconsultants
ControlPoint Engineering (Electrical and Controls Design) Jeremy Pollet and the ControlPoint team have worked with NEXGEN on every single design project and working together at this point is seamless. They are the on-call controls engineer for Stockton East WD.

Raney Geotechnical (Geotechnical Engineering)
Our team has worked with Matt Moyneur, P.E., G.E. on various water and wastewater projects for the last 20 years.

Helix Environmental Planning (Landscape Planning & CEQA) Lesley Owning will lead the CEQA efforts and Scott Redding, LS will lead the landscape design for the new visitor center.

MRPE (Surveying)
Matt Rogers, P.E., LS led the surveying effort for the Stockton Delta Water Treatment Plant and worked with the senior consultants at Geosyntec on the project.

Resumes for key personnel are included in Appendix A.

Subcontracting and Self-Performing Work Elements
Gateway Pacific Contractors has the resources and typically self -performs most of the work required for this type of project. Electrical/instrumentation is always sub -contracted out.

Gateway Pacific owns the majority of the equipment necessary to complete the work under this contract.

As required by the progressive design build contract, we will develop the cost model for the project. GPC will solicit local subcontractors and suppliers for bids for each element of work required in the project. If subcontractor bids come in higher than what is reasonable, we are able self-perform the work. This was the case on a contract we had with Ducks Unlimited for construction of Coffee Wetlands south of Tualatin. After the local dirt contactor bids came in higher than expected, Ducks Unlimited asked Gateway Pacific Contractors to mobilize their equipment from California. We did so and completed the project that summer.

ATTACHMENT A
238

4.5.2 QUALIFICATIONS INFORMATION

10 Gateway Pacific has developed a good relationship with suppliers and subcontractors during our 30 years in the business. Several subcontractors that currently work for Gateway Pacific in Northern California previously worked on our projects in Oregon.

GPC, as the lead Constructor for the Team, has agreements with the ABC registered apprenticeship program approved by the California Apprenticeship Council that has graduated apprentices in each of the past five years.

Ninety-eight percent of the contracts performed by Gateway Pacific are governed by State Prevailing Wage laws. Gateway Pacific Contractors, Inc. will be providing over 70% of the labor for the project with its own employees.

We recently completed earthwork for the following projects that are comparable to what will be required by this Project:
• Biggs WWTP Pond, (Biggs, CA)
Our crews moved over 120,000 c ubic yards of dirt to create twin 50 -million gallon detention basins.
• Gray Lodge Wildlife Area Water Supply Project, (Gridley, CA) GPC rebuilt the canal system for the Gray Lodge Wildlife Area. We moved 100,000 cubic yards of dirt to create a high -capacity canal system to convey water from the Oroville Dam.
• SEWD – Raw Water Delivery Reliability Improvement Project, (Stockton, CA) In creating the 73-acre groundwater recharge basin, our crews moved 150,000 c ubic yards of dirt.

Our workforce is a dynamic group of individuals that are adaptable and well-trained in many parts of the industry. We have equipment operators on staff. We have completed many projects that included installing reinforcement steel, forming and placement of concrete.

Most of our plant work has our crews installing mechanical piping as well as equipment (i.e. pumps, generators, mixers, aeration piping, clari fier equipment, and headwork screens & compactors).

References
All references and project experienc e summaries are included in Section 4.5.6 of this proposal.

ATTACHMENT A
239

4.5.2 QUALIFICATIONS INFORMATION

11 Financial and Bonding Capacity
Gateway Pacific Contractors has the financial strength to contract this project. On average, we complete $40 million per year in water and wastewater projects. We bank with Umpqua Bank in Sacramento and have a $1 million line of credit which we have not used in 35 years.

We can provide reviewed financial statements upon award of contract.

A bondability letter for this project for Gateway Pacific Contractors and a letter from Umpqua are included in Appendix B.

License and Insurance Requirements
Licensing and insurance requirements for Gateway Pacific are also included in Appendix B.

ATTACHMENT A
240

4.5.3 TECHNICAL PROPOSAL

12 To assist the City in the review of this proposal, we have included the City’s specific requests (RFP items a – v) and our responses below. We have also included a detailed scope of work in Appendix C.
a) Demonstrate the Respondent’s understanding of the RFP, describing how the Respondent intends to satisfy the requirements of the RFP and the Contract.

For completeness we have included the detailed scope of work/project understanding of the Project as Appendix C of this proposal. This information is adapted from the City’s RFP, job walk, and others from the project team. b) Describe Respondent’s understanding of the project objectives and desired outcomes.

The goal of the Recharge Basins Project is to design and construct groundwater recharge basins and associated infrastructure. The construction of groundwater recharge basins will improve water supply reliability and raise groundwater levels in the Eastern San Joaquin Subbasin. The recharge basins shall also be designed and constructed to provide benefits including habitat for birds, providing water, shelter, and/or breeding places during their migration along the Pacific Flyway.

The Recharge Basins shall be designed and constructed to achieve at least the infiltration rates rang ing from approximately 15,000 AF to 30,000 AF/year (1 -2 AF/day), assuming the basins are used 335 days/year. The design should consider operational needs and flexibility and the required maintenance of the basins.

A comprehensive geotechnical investigation was performed by Geosyntech in 2022-2023 to determine the feasibility of groundwater recharge at the site.

Electrical resistivity testing, soil borings, CPT, soil characterization/sampling, groundwater water quality sampling, and modeling were performed as part of the investigation. Groundwater wells were installed, and a utility survey was also completed as part of the project. We have reviewed this work and believe this supports the desired percolation.

The City also expects the Design-Build Team to complete California Environmental Quality Act (CEQA) documentation for construction of additional treatment capacity for the Delta Water Treatment Plant (DWTP) in addition to the Recharge

ATTACHMENT A
241

4.5.3 TECHNICAL PROPOSAL

13 Project construction. This is needed to pursue additional Delta diversions for groundwater recharge and to meet future potable water demand.

The figure below shows a preliminary layout of fencing and piping created by our design-build team.

This project is well-suited for Design-Build due to the extensive field work already completed and the “greenfield” nature of the site. The City will also see a compressed schedule that meets its funding constraints and will have total project costs known upfront.
c) Describe the Respondent’s intended approach toward providing the Scope of Services described in Section 3 of this RFP and otherwise achieving the City’s goals for the project.

ATTACHMENT A
242

4.5.3 TECHNICAL PROPOSAL

14 The following table includes some of our key approaches, the resulting benefits, and our team experience to meet these challenges.

Our Approach Benefits to the Project Team Experience
We will provide the City a turn-key
solution that banks water below while
creating habitat above. Our team
includes planners, geologists, landscape
architects, engineers, surveyors,
constructors, and project managers to
complete all aspects of the project.

We will provide a guaranteed
cost and firm schedule to the
city
As one nearby example, this
Team’s $6 million Recharge Basin
Project for Stockton East WD
(SEWD) was constructed in 9
months with zero change orders.

We will obtain percolation rates
described in the Feasibility Study. In
addition to removing the top 3 feet of
soil, we have shown options for
enhancing percolation within the drywell,
including over-excavating at 2:1 and
filling the entire space with angular rock.

We believe an over-excavated
drywell is a faster and safer
way to construct the wells and
will provide 10x more surface
area for percolation across the
well depth.

We have designed and constructed
eight percolation systems and
accounted for over 100,000 ac-ft a
year of recharge in California. The
60-acre basin we did for SEWD
percolates 8,600 ac-ft/ year though
clayey soils. In this project. the
over-excavation and drywell will
greatly enhance those rates.

We recommend one CEQA document
(and IS/MND) that covers both the
construction and future WTP expansion.

The technical analyses will focus on
construction emissions estimates as well
as required biological and cultural
surveys.

One comprehensive document
can be completed in nine
months and allow construction
to start in Spring of 2025.

An IS/MND is appropriate here
and is a much more
streamlined process than an
EIR.

Our Environmental permitting
team, led by Helix Environmental
Planning, has successfully
completed similar CEQA
documents for Yuba City and the
City of Modesto.

We will connect above the 54-inch raw
water pipe, neck piping and valves/ flow
meter to 24-inch above ground.

Transition to 36-inch and then to 30-inch
at each perc basin at each of those
valves.

We also recommend that the valves at
each perc basin control the flow
independently into each perc basin by
programmed setpoints at each
transducer. The valves at the connection
to the 54-inch supply would only be
needed for isolating the system
We estimate these pipe sizes
will save over $200,000 in
upfront costs and will reduce
the plant shut down time.

Our Project for the Stockton East
WD involved 60-, 54-, and 36-inch
coated steel pipes, butterfly control
valves, air release valves, and
automated metering

ATTACHMENT A
243

4.5.3 TECHNICAL PROPOSAL

15 Our Approach Benefits to the Project Team Experience We will specify and install pipe materials
and equipment that are consistent with
the existing facilities and City
Standards. For example, buried
transmission pipes shall be cement
mortar lined and coated steel pipe per
AWWA C205. Exposed pipe shall be
epoxy lined and coated.

These pipe materials and proper
bedding will minimize O&M and
extend facility life.

We have used cement mortar lined
and coated steel pipe (buried) and
epoxy coated (exposed) on most
water supply projects that use this
size pipe.

We recommend sloping the interior
levees at 3:1 to encourage habitat and
reduce wave action while maintaining
about 4 feet of water depth in the basins
themselves to discourage vegetation.

This design will create habitat
for waterfowl along the basin
perimeter but still allow a
majority of the basin to
percolate.

Our team has used approach for all
the wetland work for Ducks
Unlimited in Sutter, Yuba, and
Colusa County.

We can install perimeter fencing and
gates this year in fall to secure the site
and pre-order long lead time equipment
after the 60% Design Review. These
activities can be accomplished
independent of CEQA.

The site will be prepped and
secured for construction to start
when conditions allow in early
2025.

As one example, we installed
perimeter fencing and other
ancillary facilities to secure the site
at City of Woodland percolation
ponds so the project schedule was
not delayed by burying owl’s
mating season.

We recommend directly controlling flow
of water into each basin by having a
transducer at each stilling well modulate
the control valve directly upstream of it
This is the simplest and most
reliable way to control water
levels in each basin
We have used this control
approach successfully at Stockton
East Recharge Project

The following figure shows an overview of some of basin design features.

ATTACHMENT A
244

4.5.3 TECHNICAL PROPOSAL

16 d) City review of work products is an essential part of the working relationship with the Design - Builder. Technical proposal shall describe communications methods and tools to facilitate City review of work products at key milestones to ensure that the completed Recharge Basins meet the City’s requirements for performance and quality.

Gateway Pacific Contractors and our partner NEXGEN Utility Management, have rigorous procedures for project management. These have been developed and refined over our 30 -year history and contribute to why our clients retain us for additional work. Key elements of our management approach include:

✓ Emphasis on communication with the client and within the project team ✓ Identifying the appropriate staff to perform the work, with key senior staff involvement.

ATTACHMENT A
245

4.5.3 TECHNICAL PROPOSAL

17 ✓ Frequent comparison of planned-versus-actual budget and schedule.

The City’s PM will receive a concise progress report every month that highlights the work progress, upcoming work, and a budget update. You can call our team’s Project Manager or Principal-in-Charge at any time and discuss concerns.

Communication
All communication on the project will go through Gary Bechtel at Gateway Pacific.

During the design and permitting phase of the project , Dan Rich, P.E (NEXGEN) will also share a direct communication role with the design team and the City.

Our most direct way to communicate with you will be by meetings with you. Regular progress meetings will be scheduled monthly, during design, and weekly, during construction. We will prepare an agenda and typically forward it one week in advance so that staff is made aware of the issues to be discussed and the people required to make the necessary decisions can be in attendance. Meeting notes will be prepared for each meeting to document decisions made. Meeting notes will be distributed within three busine ss days. Items documented in the meeting notes will include:
attendees; meeting time, date, and location; record of discussion; project status; decisions made; action items; and outstanding issues. We will schedule informal meetings through our project manager to maintain proper communication channels.

These meetings can be in person or virtual, whichever is more convenient for the City’s Project Manager and staff.

Project Staffing Plan
Staffing is key to successful project management and an integral part of our quality management program. Our fundamental approach is to assemble the best qualified team to match the project requirements. We then review the scope of the project and review s taffing levels and budgets from similar projects to estimate labor requirements to complete a project. The project schedule has a significant impact on staffing planning. Project milestones are identified and labor hour requirements per task are estimated to determine staffing levels to complete the task by the milestone date. The staffing levels are broken down by discipline to determine overall office personnel planning. A database on staffing needs and current staff assignments is maintained and updated monthly, both company -wide and in our local office. The

ATTACHMENT A
246

4.5.3 TECHNICAL PROPOSAL

18 database allows us to project workloads and identify when and if staff becomes over or under committed.

Maintaining Project Schedule
Schedules are established by identifying project milestones and determining when each task must be complete to meet the milestone dates. The schedule is reviewed to determine staff requirements to
complete the project on schedule. If a
project is needed on a fast track, more
staff are assigned than for a project with
a longer schedule. On a monthly basis,
Gary will assess the percent complete for
the project. The p ercent complete is
estimated on a per task basis, in a defined
manner, and is done independen tly of
budget review. The estimated percent
complete is compared to the planned
percent complete to determine if the
project is on schedule. If the project is not
on schedule, staffing adjustments or
other corrective measures are
implemented.

Monitoring Budgets
The Project Manager has access to the labor hours charged to each job and can monitor project budgets daily. Using the cumulative hours, the percent of budget used is calculated and plotted on the project S -curve. We can then assess the following:
• Are percent complete and percent budget expended close to the planned curve?
• Are percent complete and percent budget expended curves parallel, converging, or diverging?
• Does the rate of progress match the budget expenditure rate? Schedule and labor-hour budgets are established to provide sufficient resources to complete each aspect of a project. This is monitored monthly in relation to the

ATTACHMENT A
247

4.5.3 TECHNICAL PROPOSAL

19 progress of the project to allow early detection of potential budget or schedule problems.
e) Present the technical aspects of the proposed plan to complete the project. It shall contain sufficient technical information to convey a clear understanding of the Scope of Services and the proposed approach toward developing Recharge Basins design criter ia for the City to ascertain the Respondent’s ability to perform under Contract. Technical proposal shall explain the rationale behind the Respondent’s intended approach to accomplish the project.

We have included a detail technical scope of work as Appendix C. f) Describe Respondent’s approach toward defining components of the Recharge Basins including but not limited to civil/site work, structural design, mechanical, electrical, SCADA, CMMS.

We have attached example Contract Documents that this team completed (Gateway Pacific and NEXGEN) for the Stockton East Water District that was completed in 2020. Similar to the Delta Recharge Project, the SEWD project was a 60-acre recharge basin with 60, 54, 48 and 36 concrete cylinder and lined welded steel pipe, automated control valves, meters, and habitat creation. This project was the archetype for the plant’s new SCADA and CMMS systems. There was considerable detail in how these large valves are co ntrolled to open slowly to avoid damaging surge conditions and automation to make sure the basins stay full and, if necessary, route water directly to the plant or to different basins. g) Detailed design and construction services, including approach to developing the design, cost model, preconstruction services, construction, start up and commissioning, and project closeout.

A general flowchart of each phase during project design , and a checklist of what information is cemented in each phase, is provided below. We have successfully implemented this approach with every design project.

ATTACHMENT A
248

4.5.3 TECHNICAL PROPOSAL

20 Phase 1 Phase 2 Phase 3
Design Flow
Chart

Checklist of
Completed
Items
✓ Prepare Preliminary Design Report
✓ Complete Design Criteria
✓ Complete Hydraulic Profile
✓ Complete Process Piping
Schematics
✓ Confirm Geotechnical/Surveying
✓ Prepare Layout Plan
✓ Prepare Preliminary Cost Estimate
✓ P&IDs and Process Control
Narratives
✓ Prepare Typical Details
✓ Start Structure Layouts
✓ Update Cost Estimate
✓ Initial Constructability Review
✓ Update Drawings and
Specifications
✓ Final Equipment List
✓ 60 & 90% Cost Estimates
✓ Submit 60 & 90% Complete
Drawings and Specifications
✓ Final Constructability Check
✓ QA/QC Check
✓ Complete Drawings
✓ Complete Specifications
✓ Prepare Bid Documents
Percent
Complete
Drawings: 30%
Specifications: 30%
Overall: 30%
Drawings: 60 / 90%
Specifications: 60 / 90%
Overall: 60 / 90%
Drawings: 100%
Specifications: 100%
Overall: 100%
Comments
The design team presents the design concept to
the Review Team. The intent is to catch any
flaws in the overall design concept early on
before drawings and specifications are fully
developed.

Following completion of the peer review process,
all engineers and designers are brought on to the
project and full-scale production begins.

This phase includes an in-house quality control
and constructability check before preparing final
bid documents.

Conceptual
Design Phase
Production
Phase
Final
Completion
Phase

ATTACHMENT A
249

4.5.3 TECHNICAL PROPOSAL

21 h) Detailed approach to evaluate the Feasibility Study and make any recommended changes.

As part of this proposal effort , we have reviewed the Feasibility Study and associated geotechnical investigations. We note that the perc olation basin we designed and built for the Stockton East Water District achieved similar percolation rates through the basin’s bottom as estimated in the Feasibility Study.

Therefore, our focus with the City will be to make sure the drywells are constructed for maximum flowrates and to minimize clogging. i) Innovative ideas to reduce schedule, cost, improved O&M, enhance project performance, or other benefits.

Our ideas to shorten schedule and cost include:

1) Complete both the basin construction and DWTP expansion in one CEQA IS/ MND document. This will save time and budget. 2) Pre-ordering long lead time equipment (valves, actuators, control panels, and possibly pipe) after the 60 percent design review. As the City is probably aware, electrical switchgear can take 40 weeks or more to procure nowadays.
3) Fencing and securing the expanded site in late 2024 so work can begin in 2025. This effort is independent of CEQA documentation.

Our ideas to improve O&M and enhance performance include:
1) Installing a baffle curtain at each forebay’s overflows (drawing included below) to minimize sediment into percolation basin. 2) Consider over- excavating the drywell to increase percolation area through additional rock fill (see figure below).

ATTACHMENT A
250

4.5.3 TECHNICAL PROPOSAL

22 ATTACHMENT A
251

4.5.3 TECHNICAL PROPOSAL

23 3) The 24-inch drain line could be constructed of corrugated HDPE pipe, perforated , and backfilled with gravel to allow percolation along its 2,400 -foot length. The City could achieve additional recharge without much additional cost.
4) There are many options for the visitors parking and observation area. For the purpose of establishing a preliminary budget, we have assumed there will be a short walk to the viewing area that will be raised a few feet to allow visitors to look over the fence , a 500 sf shade structure, handrail, and two weather proof signs mounted on pedestals. The area around the visitors viewing area will be natural- type landscaping and irrigation. An example of our team’s project in Elk Grove is shown below.

5) We consulted with Ducks Unlimited (one of our long -standing clients) regarding this project, and they suggested constructing islands with several bird houses, bird perches, and snags (like poles or dead trees) for raptors.

ATTACHMENT A
252

4.5.3 TECHNICAL PROPOSAL

24 Our ideas to reduce costs include:

1) Connecting into the 54-inch supply above instead of below the pipe.

This will also reduce plant shut down time during tie-in. 2) Necking down the 36-inch pipe to 24-inch at the 54 inch connection and to 30 inch at each percolation basin. We believe there is sufficient pressure to make these reductions and still deliver desired flows to each basin. This will allow smaller valves and flowmeters at these locations (see figure below).

3) The costs to install five 200-foot deep nested monitoring wells are several hundred thousand dollars . We have shown those costs in our cost proposal , but the City could also consider the costs of shallow wells or some combination of deep and shallow wells.

Savings to reduce the number of wells is included in the cost proposal.
4) Excluding the barbed wire at the top of the new fencing around the

ATTACHMENT A
253

4.5.3 TECHNICAL PROPOSAL

25 ponds will result in fairly significant savings. Cost savings for this approach are included in cost proposal.
5) If budgets are constrained, we have included an option for the City to remove Basin and Forebay #3 completely . This item has been credited separately in the cost estimate.
6) We have included an option to eliminate 1,350 linear feet of concrete weirs and wood baffles at the overflow of the forebay. This item has been credited separately in the cost estimate. j) Approach to Quality Control and Quality Assurance.

Our team has developed defined Quality Control Procedures, including:
✓ We will prepare a Project Checklist that lists various project steps. This checklist guides the project team to identify the necessary quality management steps. The checklist helps confirm that the project follows our quality management procedures. This can include special permits and regulatory approvals that could affect schedule, teaming arrangements, and project delivery issues. ✓ NEXGEN has developed several design aid manuals and other Quality Control Tools.

These manuals are maintained both as hard copies and on our intranet. These documents are regularly used on our projects to provide a consistent approach to quality management.
✓ A work plan is established to sequence the work effort, outlines when work needs to occur within the project schedule, schedules meeting times, identifies topics of discussion at the meetings, highlights key decisions to be made, and tracks the status of the project deliverables.
✓ A Project Management Plan documents the lines of communication, overall schedule, project scope and budget, staffing plan, and any special requirements . Projects receive a series of reviews at various project points as part of the Quality Control Procedures. These include a peer review at the 30 percent design phase and owner review at set milestones (60 and 90 -percent). These checklists will be modified b ased on the particular task order that we will work on under the contract.

ATTACHMENT A
254

4.5.3 TECHNICAL PROPOSAL

26 k) Understanding of site conditions.

This project is unique in that there are many elements that each cost several hundred thousand dollars to complete:
✓ Perimeter Fencing
✓ Moving and stockpiling dirt
✓ Forebay construction
✓ Levee Construction
✓ Deep monitoring wells
✓ Welded steel pipe procurement and installation (this is probably the single largest cost)
✓ Control valves and metering
✓ Drywell construction
✓ Visitors viewing and parking area
As a result, it requires the team to focus on each project element and understand how changes to one area could impact system performance and project costs. l) Risk identification and mitigation plan.

See above discussion on site conditions.
m) Development of a definitive project schedule, clearly defining all major tasks, milestones, interdependencies, and critical path.

Our team schedule is included on the next page.

ATTACHMENT A
255
Act
ID
Description Orig
Dur
Start Compl 2024
APR
2025
MAY
2026
JUN
2 JUL AUG SEP OCT NOV DEC JAN FEB MA R APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MA R APR MAY JUN JUL AUG SEP OCT NOV DEC A

DESIGN - DESIGN AND REVIEW
1000 SUBMIT D/B PROPOSAL 0 0 04APR24
1010 CITY OF STOCKTON EV ALUA TE PROPOSALS 20 2004APR24 01MAY24 1020 CONTRACT NEGOTIA TIONS-COUNCIL APPR 65 6502MAY24 31JUL24 1030 NOTICE TO PROCEED - CONTRACT 0 0 01AUG24
2000 Design Validation, VE and Workshop 22 2201AUG24 30AUG24 2010 30% Design Completion 45 4502SEP24 01NOV24
2020 Visitors Center Parking / Landscape Plan 45 4502SEP24 01NOV24 2030 Client Review 30% Design 10 1004NOV24 15NOV24
2040 60% Design Completion 55 5518NOV24 31JAN25
2050 Visitors Parking Construction Documents 55 5518NOV24 31JAN25 2060 Client Review 60% Design 10 1003FEB25 14FEB25
2070 90% Design Completion 20 2017FEB25 14MAR25
2080 Client Review 90% Design 5 5 17MAR25 21MAR25
2090 100% Design Completion 30 3024MAR25 02MAY25

PERMIT - CEQA PERMMITTING
3010 Biological Resources Assessment 70 7002SEP24 06DEC24 3020 Cultural Resources Assessment 70 7002SEP24 06DEC24 3000 Air Quality/Greenhouse Gas Emissions Analysis 31 3104NOV24 16DEC24 3030 Noise Analysis and Vibration 21 2104NOV24 02DEC24
3040 Administrative Draft IS/MND 42 4204NOV24 31DEC24
3050 Public Rev iew 33 3301JAN25 14FEB25
3060 Final IS/MND 10 1017FEB25 28FEB25
3070 Draft and Final NOI, NOC 10 1003MAR25 14MAR25
3080 Draft and Final NOD 20 2017MAR25 11APR25

CONSTR - CONSTRUCTION
1599 FINAL PUNCHLIST ITEMS / MOVE-OFF 22 2204APR24 03MAY24 1510 SURVEY / LOCATE UTILITIES 10 1001OCT24 14OCT24
1520 INSTALL PERIMETER FENCING 30 3015OCT24 25NOV24
1300 PROCURE STEEL PIPE - LONG LEAD TIME 140 4017FEB25 29AUG25 1340 PROCURE V ALVES - LONG LEAD TIME 180 8017FEB25 24OCT25 1540 START MASS EXCAVAT I O N 20 2004AUG25 29AUG25
1550 INSTALL 24" OVERFLOW PIPE 20 2001SEP25 26SEP25
1560 COMPLETE MASS EXCAVAT I O N 80 8001SEP25 19DEC25
1530 TIE-IN 54" PIPE WITH VAL VES (Dec thru May) 10 1001DEC25 12DEC25 1570 INSTALL WELLS 40 4022DEC25 13FEB26
1580 INSTALL 36" & 30" PIPE AND VAL VES 60 6022DEC25 13MAR26 1610 CONST VISITORS VIEWING AREA/SIGNS/LS 120 2022DEC25 05JUN26 1590 CONSTRUCT SLAB ON GRADE CONCRETE 40 4016MAR26 08MAY26 1620 ELECTRICAL & CONTROLS 60 6016MAR26 05JUN26
1600 INSTALL RIP-RAP 30 3011MAY26 19JUN26
8000 INITIAL ACCEPTANCE TEST - START-UP-TRAIN 20 2022JUN26 17JUL26 8010 FINAL ACCEPTANCE TEST 10 1020JUL26 31JUL26
9888 SUBSTANTIAL COMPLETION 0 0 31AUG26
9999 FINAL COMPLETION 0 0 30SEP26

SUBMIT D/B PROPOSAL

CITY OF STOCKTON EVALUATE PROPOSALS

CONTRACT NEGOTIATIONS-COUNCIL APPR

NOTICE TO PROCEED - CONTRACT EXECUTION
Design Validation, VE and Workshop
30% Design Completion
Visitors Center Parking / Landscape Plan
Client Review 30% Design
60% Design Completion
Visitors Parking Construction Documents
Client Review 60% Design
90% Design Completion
Client Review 90% Design
100% Design Completion
Biological Resources Assessment
Cultural Resources Assessment
Air Quality/Greenhouse Gas Emissions Analysis
Noise Analysis and Vibration
Administrative Draft IS/MND
Public Review
Final IS/MND
Draft and Final NOI, NOC
Draft and Final NOD

FINAL PUNCHLIST ITEMS / MOVE-OFF

SURVEY / LOCATE UTILITIES

INSTALL PERIMETER FENCING

PROCURE STEEL PIPE - LONG LEAD TIME

PROCURE VALVES - LONG LEAD TIME

START MASS EXCAVATION
INSTALL 24" OVERFLOW PIPE

COMPLETE MASS EXCAVATION
TIE-IN 54" PIPE WITH VALVES (Dec thru May)

INSTALL WELLS
INSTALL 36" & 30" PIPE AND VALVES

CONST VISITORS VIEWING AREA/SIGNS/LS

CONSTRUCT SLAB ON GRADE CONCRETE

ELECTRICAL & CONTROLS

INSTALL RIP-RAP

INITIAL ACCEPTANCE TEST - START-

FINAL ACCEPTANCE TEST

SUBSTANTIAL COMPLET

FINAL COMPLETIO
Start date 04APR24
Finish date 30SEP26
© Primav era Sy stems, Inc.

Delta Groundwater Recharge Basin
G ateway Pacific / Nexgen D-B
Date Revision Checked Approv ed
04APR24 Submit Proposal DB

ATTACHMENT A
256

4.5.3 TECHNICAL PROPOSAL

28 n) Approach to cost control through the use of early procurement and work packages.

Our approach is to complete non -CEQA related construction this year (fencing, gates, possibly some access road improvements) to allow construction to start in early 2025.

We will order long-lead time equipment after City review of the 60 Percent Design.

This is described in the section above.
o) Detailed internal and external communication plans.

See section above on Project Management
p) Approach to managing cost escalation.

We are committing to a total project costs and schedule as part of this proposal.

Our company has a proven track record of controlling costs and we encourage the City to discuss this with our references. We note that our project for SEWD’s Perc Basin was a $6 million construction project that had zero cost change orders.

As described previously, our approach is to provide the City with a detailed schedule of values at the beginning of the project and each month we would track “percent complete” on each task and subtask.
q) Approach to selecting and managing subconsultants and subcontractors.

We have worked with this team of subconsultants and subcontractors for the last 20 years. They represent the very best expertise and value to the City. Specifically:
• The Design Team : NEXGEN (Civil/Mechanical Design), Control Point (Electrical and Controls Design), Raney Geotechnical (Geotech) and Helix (Environmental and Landscape Design). This group successfully completed our work for Stockton East, Wheatland, Auburn, Colusa, and West Sacramento. Our teams ’ surveyor is Matt Rodgers at MRPE, who completed the survey for the Feasibility Study. • The Construction Team : Gateway Pacific Team will consist of the same personnel that constructed the Stockton East Water District Ground Recharge Project. Evan Lundin and Gary Bechtel will continue over sight of the Design Build and Construction. Jay Hall will be the Project Manager assisting Gary Heim our Superintendent/Project Manager full time on site. Our Subcontractors (listed in

ATTACHMENT A
257

4.5.3 TECHNICAL PROPOSAL

29 the fee proposal) have all worked with Gateway Pacific on past projects. Gateway Pacific has 40 employees to select from in and around Stockton and Sacramento area. Most of them worked on the SEWD project.
r) Approach to cost control and change management.

Discussed in Project Management above.
s) Approach to operator engagement and training.

Consistent with the RFP, we have several design deliverables (initial validation, 30%, 60%, 90% and final). At e ach of these milestones , we will conduct a workshop with City operations and engineering staff. General themes to be discussed include:
1) How is water controlled into each basin.
2) What failsafes exist if water overflows a basin
3) Are valves controlled as open / close or do they modulate. 4) The importance of valves closing slowly to avoid surge conditions. 5) If a valve fails, does it fail open or closed.
6) What alarms are desired.
7) Access to the valves and flow meter for maintenance
8) Expectations for drywell repair and maintenance
9) Frequency of forebay cleaning operations and access for vehicles and equipment.
10) Trade-offs between emerging vegetation along perimeter for habitat creation and additional maintenance along the levees.
t) Procedures to develop the design, project management, QA/QC, permitting, key risk factors, and other services described in Section 3 as follows:
i. Procurement of equipment and materials separately from construction phase as necessary to achieve project delivery schedule.

Discussed above.
ii. Integration with the City’s SCADA system.

Our electrical and controls engineer ControlPoint has worked with the City’s SCADA consultant John Wooton on several projects and is currently working with

ATTACHMENT A
258

4.5.3 TECHNICAL PROPOSAL

30 him and NEXGEN on the City of Galt’s WWTP upgrade. We routinely program in City’s Aveva (Wonderware) SCADA software.
iii. Compliance with all permitting terms and conditions.

Our scope includes all work for an approved Mitigated Negative Declaration for the project construction and DWTP expansion, as well as all permitting needed for drilling of monitoring wells.
iv. Compliance with all environmental mitigation requirements if required.

See above.
v. Completion of all construction per the approved drawings and specifications.

Due to the numerous similarities in project scope between this and our project for Stockton East Water District, we have provided the Contract Documents for that project as a separate attachment.
vi. Site safety and security during construction including coordination of site visits.

At Gateway Pacific, our goal is to create a Safety Culture that is valued and prioritized by the entire organization beginning with upper management. Our Safety is our highest priority and is instilled within the Gateway family as a mindset we enhance each day. All employees are encouraged to be our eyes and ears in the workplace and to immediately take action to remedy the problem and/or stop work and notify supervision whenever an unsafe situation is discovered. To this end, Gateway Pacific is committed to providing employees with the proper equipment, PPE, training and safe work procedures to make informed decisions and achieve our objective of no lost time incidents.

All project sites hold weekly tailgate safety meetings directed by our experienced Site Superintendents. Site superintendents are kept current in the following areas of safety training:
• First Aid/CPR
• Personal Protective Equipment (PPE)
• Housekeeping/Site Cleanliness

ATTACHMENT A
259

4.5.3 TECHNICAL PROPOSAL

31 • Code of Safe Practices
• Competent Person Excavation
• Confined Space/Respiratory Protection
• Heat Illness Prevention
• Fire Safety Plan
• Equipment/Electrical Lockout/Tagout
• Crane/Forklift Certification
• Rigging and Flagging
• Qualified SWPPP Practitioner
• CESSWI-QSP certification
• Fall Protection Awareness
• Harassment Prevention
Gateway Pacific is proud to promote a safety culture which strongly instills safety integrity in the minds of each of its employees. We believe this is a major key to our success and our ability to retain seven Superintendents with over twenty years of experience with Gateway Pacific Contractors, Inc. • We are proud to have current a Workers Comprehension Experience Modification (EMR) of 0.96
• Our Work Injury Incidence Rate for the last three years is:

YEAR
TOTAL

RECORDABLE

INCIDENTS
TOTAL
HOURS
WORKED
OSHA

INCIDENCE
RATE
2023 2 1333,343 0.96
2022 1 127,145 0.69
2021 2 118,264 0.87

vii. Completion of start -up and all required acceptance tests, SOP development, training, and including provision of chemicals during start- up.

Our schedule shows each of these activities to ensure a complete and successful project.
viii. Provide a definitive schedule for the project and a preliminary schedule, clearly defining all major tasks, milestones, and interdependencies. The schedule shall clearly identify all milestones (Section 3.2.8).

See critical path schedule in section above.

ATTACHMENT A
260

4.5.3 TECHNICAL PROPOSAL

32 u) Provide a single summary sheet which must indicate the proposed contract time for the project in calendar days from Notice to Proceed to the point of completion.

ATTACHMENT A
261

4.5.4 FEE PROPOSAL

33 Under separate cover.

ATTACHMENT A
262

4.5.6 REFERENCES

34 We have completed the Appendix J form for Gateway Pacific and NEXGEN . We have also highlighted which projects have been completed together as a Design-Build partnerships. In addition, Appendix D includes several client references letters for your review.

ATTACHMENT A
263

4.5.6 REFERENCES

35 LIST OF REFERENCES – NEXGEN Utility Management

1. Agency or Firm Name Stockton East Water District
Business Address: 6767 East Main Street, Stockton, CA 95215 Contact Person: Justin Hopkins
Telephone: (209) 444-3150
Email Address: [email protected]
Description of Service: Stockton East Water Treatment Plant, Storage, and Recharge Basin Project
NEXGEN completed design and construction support for new pipelines, control valves, percolation and pretreatment basins at the Stockton East Water Treatment Plant.

Gateway Pacific Con tractors was the General Contractor on this important project.

The plant has capacity to treat 60 mgd and serves several hundred thousand residences and businesses in Stockton.

The plant is supplied by two different water sources that are conveyed in two separate 54 inch and 60 inch transmission pipes. Our project added a new 60 MG percolation and
pretreatment basin and eight large (36-inch, 48-inch, and 54- inch) control valve structures to allow the water to be automatically routed to different basins or processes. About 5,000 feet of 48 -, 54-, and 60-inch cement lined and treated steel cylinder pipe was designed and constructed.

The project included hydraulic modeling of 10 miles of
transmission piping and a surge analysis to minimize
transient conditions that can occur with larger flows and long pipes like this.

The project was located near sensitive Native American
historical sites. We hired a team of a dozen archaeologists to canvas the site, carefully auger 5 foot soil samples in 50 foot grids and determine the presence of any artifacts. The approach was endorsed and the results supported by tribes in the area and allowed the project to be constructed without any delays or added costs.

The project was also the District’s first significant design build project. Gateway Pacific gave the District a firm cost based on our 60% design documents. The approach allowed the
project to be constructed over one year instead of two. There were zero cost change orders on this project.

Date(s) When Service Provided 2017-2019

2. Agency or Firm Name City of Colusa

ATTACHMENT A
264

4.5.6 REFERENCES

36 Business Address: 425 Webster Street, Colusa, CA 95932 Contact Person: Jesse Cain
Telephone: (530) 458-4941 x 3105
Email Address: [email protected]
Description of Service: Recycled Water Upgrades for the City of Colusa NEXGEN has served as the City’ of Colusa’s Water and
Wastewater Consultant for the last 15 years.

Gateway Pacific has completed several construction projects at the City’s plant since 2016.

We planned and designed new booster pump stations and
piping systems to irrigate 400 acres of city owned farmland and dual plumbed urban water users including the City’s schools, fairgrounds, and common landscaping areas.

We have planned, designed, and managed construction over $40 million in plant improvement projects over 3 separate construction projects, including new filtration, chemical feed facilities, emergency power, aeration, ultraviolet light disinfection, booster pumping, residuals management,
recycled water pumping and storage and distribution.

In 2016, Gateway Pacific Contractors was the lowest
responsible bidder for a $15 million dollar improvements to the plant, including construction of a 60 MG recycled water storage and percolation basin and associated piping,
automatic valves, and booster pumping. The project was completed on time and within budget.

Date(s) When Service Provided 2005 – Present Day

Signature and acknow ledgment by signing below, I certify that I am authorized by the company named above to respond to this request.

Company/Firm Name NEXGEN Utility Management, Inc.

Address 4010 Lennane Drive, Sacramento, CA 95834
Contact Name Dan Rich, P.E., Vice President
Email/Phone [email protected] / 916-835-8399
Fax: N/A Signature:

ATTACHMENT A
265

4.5.7 FINANCIAL STATEMENT

37 ATTACHMENT A
266

Appendix A
Team Resumes

ATTACHMENT A
267

EVAN LUNDIN
GATEWAY PACIFIC CONTRACTORS, INC.
8055 FREEPORT BLVD.

SACRAMENTO, CA 95832
PHONE: 916/665-4100

EDUCATION: Kansas State University
1976 B.S. Construction Management

PARTIAL/RECENT DESIGN BUILD EXPERIENCE
12/87 - Present CEO/President

As President, CEO, and Founder of Gateway Pacific, Evan develops and implements high-level strategies, makes major corporate decisions, oversees all cost estimating, and manages the overall operations and resources of the Company. He is deeply involved in all aspects of business development and strategic planning for the business.

Evan assesses project opportunities, identifying possible risks and proposes alternate risk mitigation strategies.

Over the past 30 years, Evan has overseen Gateway Pacific’s estimating department which has bid over $4 billion of water and wastewater plants, water and sewer pipeline projects. Out of this $4 billion, Gateway Pacific Contractors received contracts and successfully completed nearly $1 billion in water-related projects.

In the last 10 years many of the project owners have opted to use the Design Build delivery method. Evan has taken the lead in cost estimating and reviewing plans to reduce the overall potential for change orders, conflicts and claims during the construction phase. Identifying and resolving issues during the design phase leads to significant economic benefits. The Design/Build process helps to avoid delays and impacts due to coordination issues, lack of details or inaccurate information and to streamline the construction schedule.

Partial List of Projects – 1987 to Present Professional References

➢ Alta Sierra Reservoir Replacement-Grass Valley, CA $5,722.786 Design Build project for a 3MG prestressed concrete reservoir and disposal of existing Hypalon material.
➢ Raw Water Delivery Reliability Improvement -Stockton, CA $4,846,440 Design Build project to create a 73-acre ground water recharge basin. ➢ Siphon Lane Pump Station-Nevada City, CA $2,595,764 Design Build pump station in a remote foothill area to convey water between irrigation canals. Due to the great distance to available permanent power, the PS was designed to utilize diesel powered engine driven Vertical Turbine Pumps. ➢ Bay Street Reservoir Replacement Project, Phase 3 -Santa Cruz, CA $7,470,611 Design Build one new 6MG prestressed AWWA D110 Type 1 water tank, site improvements, and demolish four steel 1.5MG tanks. ➢ Micromidas Pilot Plant -West Sacramento, CA $2,900,298 Design Build project to build plant which turns recycled cardboard into paraxylene. ➢ Banner Taylor Reservoir Restoration Project-Nevada City, CA $7,765,977 Design Build project to replace an earthen reservoir with one 4.6MG and one

5.9MG prestressed concrete tank.
➢ Cement Hill Water Storage Tank Project -Fairfield, CA $4,839,551 Construction of a 2MG prestressed concrete potable water storage tank, associated mechanical and electrical facilities as well as TTHM removal system. ➢ Wastewater Treatment Project 2016 Improvements-Colusa, CA $7,108,823 ➢ Downstream Tier 1 North Tank 11 and Pump Station -Modesto, CA $10,695,893 Construct 6.0MG prestressed concrete water reservoir and 18MGD booster pump station.
➢ J.B. Latham Treatment Plant Facility Improvements -Dana Point, CA $14,613,932
➢ Soscol Water Recycling Facility, Ph 1 Recycled H20 Expansion -Napa, CA $12,276,033
Doug Valby
City of Santa Cruz
831/420-5212

Doug Roderick
Nevada Irrigation
District
530/271-6866

ATTACHMENT A
268

GARY BECHTEL
GATEWAY PACIFIC CONTRACTORS, INC.
8055 FREEPORT BLVD.

SACRAMENTO, CA 95832
PHONE: 916/665-4100

EDUCATION: Lehigh University
1980 B.S. Civil Engineering

PARTIAL/RECENT DESIGN BUILD EXPERIENCE
12/87 - Present Executive Vice President, Corporate Operating Officer

Gary Bechtel is an engineering and construction management industry veteran having served in multiple senior level positions over a distinguished 35-year career. Bechtel’s career includes a broad and diversified project portfolio including an $800 million Liquefied Natural Gas (LNG) Plant in Indonesia and a $5.5 billion U.S.

Nuclear Power Plant while with Bechtel International as well as over $800M in successful wastewater and water treatment, storage and transmission projects for Gateway Pacific where he has served as Executive Vice President & COO since 1998.

Partial List of Projects – 1987 to Present Professional References

➢ Alta Sierra Reservoir Replacement-Grass Valley, CA $5,722.786 Design Build project for a 3MG prestressed concrete reservoir and disposal of existing Hypalon material.
➢ Raw Water Delivery Reliability Improvement -Stockton, CA $4,846,440 Design Build project to create a 73-acre ground water recharge basin. ➢ Siphon Lane Pump Station-Nevada City, CA $2,595,764 Design Build pump station in a remote foothill area to convey water between irrigation canals. Due to the great distance to available permanent power, the PS was designed to utilize diesel powered engine driven Vertical Turbine Pumps. ➢ Bay Street Reservoir Replacement Project, Phase 3 -Santa Cruz, CA $7,470,611 Design Build one new 6MG prestressed AWWA D110 Type 1 water tank, site improvements, and demolish four steel 1.5MG tanks. ➢ Micromidas Pilot Plant -West Sacramento, CA $2,900,298 Design Build project to build plant which turns recycled cardboard into paraxylene. ➢ Banner Taylor Reservoir Restoration Project-Nevada City, CA $7,765,977 Design Build project to replace an earthen reservoir with one 4.6MG and one

5.9MG prestressed concrete tank.
➢ Cement Hill Water Storage Tank Project -Fairfield, CA $4,839,551 Construction of a 2MG prestressed concrete potable water storage tank, associated mechanical and electrical facilities as well as TTHM removal system. ➢ Wastewater Treatment Project 2016 Improvements-Colusa, CA $7,108,823 ➢ Downstream Tier 1 North Tank 11 and Pump Station -Modesto, CA $10,695,893 Construct 6.0MG prestressed concrete water reservoir and 18MGD booster pump station.
➢ J.B. Latham Treatment Plant Facility Improvements -Dana Point, CA $14,613,932
➢ Soscol Water Recycling Facility, Ph 1 Recycled H20 Expansion -Napa, CA $12,276,033
➢ Recycled H20 Reclamation Plant Expansion and PS -San Clemente, CA $8,250,063
Matt Scoble
Consolidated CM
(415) 385-2821

Tom Epperson
TetraTech
Engineering
(949) 809-5156

Stacey Lynch
Bennett Engineering
Services
(916) 771-6153

Dan Rich
Nexgen Utility
Management
(16) 865-3899

Billy Stewart
Butier Engineering
(949) 861-1467

ATTACHMENT A
269

GARY HEIM
GATEWAY PACIFIC CONTRACTORS, INC.
8055 FREEPORT BLVD.

SACRAMENTO, CA 95832
PHONE: 916/665-4100

PARTIAL/RECENT EXPERIENCE
1987 - Present On Site Project Manager/Superintendent

As a project superintendent, Gary is responsible for completing each project under budget and on time. His daily duties include planning, workforce management, coordinating subcontractors and suppliers, and interaction with the owner’s representatives. Other duties include value engineering, updating CMP schedules and weekly cost accounting.

Partial List of Projects – 1987 to Present Professional References

➢ Hughson-Well #7 Replacement Phase IV-Hughson, CA / $7,895,716 Work includes the final construction phase of a water treatment facility and associated components, including but not limited to, equipping existing well mechanical components, booster pumps and motors, yard piping, electrical power and controls, chemical disinfection systems, instrumentation, control building, emergency power system, testing, start-up, training. ➢ Raw Water Delivery Reliability Improvements-Stockton, CA $4,846,440 Create a 73 acre ground water recharge basin, with a 36” –54” WSP / RCP manifold modification to feed raw water to the basin. Includes 36” – 54” piping to create interconnections to different raw water ponds. As part of the project, electrical improvements will be made to make all valves and slide gate. ➢ Well #7 Replacement PH II Storage Tank-Hughson, CA / $1,896,104 Work includes preparing and grading soil of tank pad, installation of perimeter drain, installation of tank inlet and outlet piping, overflow pipe, tank access, exterior coatings, maintenance of existing erosion control systems, site security, disinfection and testing of pipes and tank, clean -up of site, and other work as needed to provide a complete and functioning 1MG prestressed concrete water tank.
➢ Cement Hill Water Storage Tank Project- Fairfield, CA / $4,889,538 Construction of a 2MG prestressed concrete water storage tank, steel/ductile iron manifolding, polyvinyl chloride (PVC) pipe, reinforced concrete, pre -cast concrete vaults, excavation, compacted embankment, aggregate base, asphalt concrete paving, concrete curb and gutter, chain link and barbed wire fencing, mixer, blower and TTHM removal system, landscaping, storm water pollution prevention plan, electrical controls and equipment, PG&E electrical power service and miscellaneous appurtenances
➢ Reynolds Ranch Reservoir & Booster Pump Station -Vacaville, CA / $4,613,82
Build 0.55MG prestressed concrete water storage tank and booster pump station. ➢ Buck Reservoir Seismic Retrofit Project-Vacaville, CA / $1,472,106 Retrofitting the existing prestressed concrete Buck Reservoir, including hydroblasting of exterior wall, footing modifications, installation of seismic restraint cables, tank exterior coating, and installation of new tank wall prestressing to meet seismic standards.
➢ Cannery Segregation Line Diversion Structure-Modesto, CA / $1,438,594 Construction of a diversion structure between the Cannery Segregation Trunk Line and the domestic sewer River Trunk Line to allow the bypass of flows in the event one of these trunks experiences a failure.
➢ Downstream Improv Tier 1–North Tank 11 & Pump Station-Modesto, CA / $10,695,893
Construct 6.0MG prestressed concrete water reservoir and a masonry block booster pump station with rated capacity of 18MG per day.

Dennis Becker
City of Modesto
209/577-5315

Chad Adams
City of Modesto
209-571-5172

Andy Timko
City of Vacaville
707-449-5415

Tom Stine
City of Vacaville
707-449-5291

Juan Morel
DR Horton America’s
Builder
925-315-0775

ATTACHMENT A
270

JAY HALL
GATEWAY PACIFIC CONTRACTORS, INC.
8055 FREEPORT BLVD.

SACRAMENTO, CA 95832
PHONE: 916/665-4100

EDUCATION: University of the Pacific
1990 B.S. Construction Management; B.S. Professional Management

PARTIAL/RECENT EXPERIENCE
03/01 - Present Vice President & Operations Manager

As Vice President and Operations Manager, Jay is responsible for planning, organizing, and managing the construction and rehabilitation of a wide range or projects involving public infrastructure for water and sewer, public utility operations, and base facilities. Jay creates budgets and schedules and monitors expenses and progress for each project. Working closely with project superintendents and foremen, he ensures that all work is performed efficiently, safely, and in strict compliance with building codes and regulations. Jay remains in constant communication with the Owners and Construction Managers to assure that they remain well informed and that their expectations are met.

Partial List of Projects – 1987 to Present Professional References

➢ Biosolids & Energy Ph. 1 / Goleta, CA / $9,765,442
Demolition, relocation of a primary effluent pipeline, construction of a reinforced concrete digester, installation of electrical generation system, upgrades to the digester heating system, electrical upgrades, and instrumentation and control upgrades.
➢ Marysville WWTP Ponds Closure / Marysville, CA / $3,729,118 Removal of sludge from the wastewater treatment ponds, clearing, grubbing, and stripping of the ponds, removal of all structures and piping associated with the treatment ponds and grading of the site.
➢ Well 17 Treatment Plant & Storage Tank/ Marysville, CA / $12,827,607 Installation a vertical turbine well pump and motor, construction of concrete well pad, well drain manhole, well discharge piping. Phase II includes Well 17 site and water storage tank site improvement, including an aerator system and sump, chlorinated water booster pump station, a pressure filter water treatment system and controls, a backwash tank, a CMU Chemical/Control Building with electrical equipment and an on -site hypochlorite generation system, a 1.0-MG water storage tank and a filtered water pump station, a pre-engineered Electrical Building, diesel engine generators, motor control centers, a PLC -based control system with a new cloud-based SCADA monitoring of facility, instrumentation, site piping and filtered water piping.
➢ Darrell Water Tank Replacement Project / Hillsborough, CA / $7,180,000 Construct a new 2 million -gallon (MG) above -ground circular prestressed concrete water storage tank constructed in accordance with AWWA D-110. The new tank will be located adjacent the existing 1 MG Darrell Tank #3 steel tank which will remain in service.
➢ Gray Lodge Wildlife Area Water Supply Ph 5E / Gridley, CA / $1,906,113 Major items of work included: vegetation clearing and preliminary site preparation, demolition of three existing check structures, construction of one new cast-in-place check/canal crossing structure and one new precast concrete lateral headgate structure and other associated improvements along Biggs-West Gridley Water District’s Lower Belding, Green and Schwind Laterals.

Generally, the work begins approximately 20’ upstream of the Bonslett Check/Crossing and ends approximately 40’ downstream of Schwind and Green Headgate Structures.

Doug Valby
City of Santa Cruz
831/420-5212

Doug Roderick
Nevada Irrigation
District
530/271-6866

Dennis Becker
City of Modesto
209/577-5315

ATTACHMENT A
271

Dan Rich P.E.

Project Manager

NEXGEN Utility Management, Inc.

Dan has thirty of experience in planning, designing, and evaluating processes for wastewater and sludge treatment. He specializes in treatment process development, process modeling and design, performance evaluation, trouble-shooting, and NPDES compliance. He has served as Project Manager for over twenty sewer master plans and twelve wastewater treatment plant designs for cities across California. Dan co- founded Nexgen Utility Management in 2005 and is a Vice President of the firm. In his spare time, Dan serves as an elected member of the San Juan Water District which provides treated water to 300,000 people in Placer and Sacramento Counties.

EDUCATION
M.S. Sanitary Engineering, University of California
at Davis, Davis, CA

MBA, University of California at Davis, Davis, CA

B.S. Civil Engineering, University of Colorado at
Boulder, Boulder, CO

REGISTRATIONS
Professional Civil Engineer No.56365, State of
California

PROJECT EXPERIENCE
Pump Station Design Experience
City of West Sacramento Coke Street Pump
Station Upgrades (2019-2020). Dan served as
Project Manager for design and construction of
upgrades for two sewer pump stations (Coke
Street and Triangle lift station upgrades had a
combined construction cost of $1.42 million).

Coordinated field surveying and mapping,
condition assessment, hydraulic evaluation,
coordinated with geotechnical engineering and
structural sub-consultants. Design included a new
wet well made of fiber reinforced plastic (FRP),
two submersible pumps, emergency bypass
connection to the force main, emergency
generators, FOG and odor control, and a secure
concrete building. Provided constructability review,
bid support, and engineering support during
construction.

City of West Sacramento Triangle Lift Station
(2021). NEXGEN utilized the same design as the
Coke Street PS for the Triangle Lift Station. This
resulted in significantly reduced costs in design
and construction.

City of Auburn Pump Station Rehabilitation
Projects (ongoing). Dan is the Project Manager
for four PS upgrades (Vista, Monicello, Vintage
Oaks, Diamond Ridge) which included the
following improvements:
✓ New standby generators
✓ Odor scrubbers
✓ New epoxy-coated pre-cast wet wells
✓ New submersible pumps
✓ New SCADA and control systems
Utilized Virtual Project Manager (VPM) and Wrike
to manage project documentation and details,
facilitate communication between all parties, and
keep everyone informed of latest updates during
the project.

City of Wheatland Regional Sewer Project
Pump Station Design (Current). NEXGEN
performed an alternatives analysis to determine
the best regionalization option for the City of
Wheatland’s wastewater treatment. We
determined that a pipeline to a neighboring
community’s WWTP was the most cost effective
solution. NEXGEN is working with the City to
determine placement of the 3 pump stations
required to transport Wheatland’s wastewater.

All three pump stations are being designed with
submersible pumps, a “trench” style concrete wet
well with epoxy liners to allow self-cleaning
operation, grade valves and flow meter, alarms
and operation tied to City SCADA, a control
building, and an emergency generator or diesel
pump. One station will have a sampling station
and one station, located near a residential area, is

ATTACHMENT A
272

Dan Rich P.E.

Principal Engineer

NEXGEN Utility Management, Inc.
being designed for chemical addition for odor and
corrosion control.

Dan manages the project and coordinates
regularly with project stakeholders: Yuba Water
Agency, Yuba County, OPUD, LCWD, Wheatland
staff, members of Wheatland’s City Council, and
the City’s consultants preparing the financial plan
and environmental documentation.

Jackson Rancheria New Influent Pump Station
and Headworks Design (2017). The previous
pump station had a number of deficiencies: the
pumps and pipes were overloaded, odors were
traveling up the storm drain pipes and could be
detected in the Rancheria parking lot, required
significant maintenance, and access was on a
road leading to many homes.

Dan oversaw the $100,000 design of the new
influent pump station which included:
✓ Relocating the pump station to a less
trafficked location
✓ Three VSPs (two duty, one standby)
✓ Magnetic influent flow meter
✓ Emergency storage tank
✓ Carbon odor scrubber for odor control
✓ Plant influent sampler
✓ Small building for electrical control panels and
some chemical systems
✓ Two parallel 8-inch forcemains
✓ Magnesium hydroxide feed system for
alkalinity control (includes a storage tank with
mixer and two chemical metering pumps to
meter magnesium hydroxide slurry into the
wet well)
NEXGEN also provided construction management,
specialty inspection, and construction support for
this project (2018).

City of Auburn WWTP Solids Dewatering and
Pumping Systems Upgrades Project (2020 –
2023). Dan was the Project Manager for design,
bid support, and construction management
services of this $5 million construction project.

The project includes:
✓ New 3,550 sq. ft. solids dewatering building to
house new dewatering facilities
✓ New 1,000 sq. ft. loading dock
✓ Upgrades to plant water pumps to provide
additional water supply capacity as a result of
the screw press and polymer water system
demands.

Water & Wastewater Design Experience
Stockton East Water District – Phase 1 North
Site Groundwater Recharge Project (2017 to
2019). Dan was the project manager for design
and construction support for new pipelines, control
valves, percolation, and pretreatment basins at the
Stockton East Water Treatment Plant. This project
added a new 60 MG percolation and pretreatment
basin and eight large (36-inch, 48-inch, and 54-
inch) control valve structures to allow the water to
be automatically routed to different basins or
processes. About 5,000 feet of 48, 54 and 60-inch
cement lined and treated steel cylinder pipe was
designed and constructed.

The project was also the District’s first significant
design build project. Our team included a
specialized earthwork contractor that was able to
give the District a firm cost based on our 60%
design documents. The approach allowed the
project to be constructed on one year instead of
two, with zero change orders due to the nature of
the contract we negotiated with the contractor.

City of Auburn WWTP Solids Dewatering and
Pumping Systems Upgrades Project (2020 –
Current). Dan is the Project Manager for design,

ATTACHMENT A
273

Dan Rich P.E.

Principal Engineer

NEXGEN Utility Management, Inc.
bid support, and construction management
services of this $5 million construction project.

The project includes:
✓ New 3,550 sq. ft. solids dewatering building to
house new dewatering facilities
✓ New 1,000 sq. ft. loading dock to
accommodate large solid waste trucks to haul
dewatered solids to the landfill
✓ The new building will house: the new screw
press equipment, chemical feed system,
restroom, and sampling facilities
✓ A new outlet box level transmitter and motor
operated outlet control valve will be installed at
the oxidation ditch outlet to minimize air
entrainment in the water during periods of high
flow
✓ New sewer to bypass the Pond 1B pump and
measure diverted flow using a Parshall flume
City of Woodland WWTP Improvements (2008-
Current) Since 2008, NEXGEN has served as the
City of Woodland’s Wastewater Consultant and
Dan has served as the City’s Project Manager for
various plant improvement projects. In 2009 and
2014, Dan served as PM for NPDES permit
renewals. In each renewal, the adopted permit
limits became less restrictive. Each summer since
2010, Dan has served as the PM for sludge
stabilization, drying, and hauling operations at the
WWTP. The WWTP utilizes a novel system of
facultative ponds which use solar energy/algae to
digest and dry the solids. The stabilized solids are
used for alternative daily cover at the nearby
landfill. In 2015, Dan served as City advisor for a
$1.4 million pond project that cement and lime
treats the bottom of two 10-acre ponds and
constructs various piping and valving
improvements. In 2010-2013, Dan served as PM
for improvements to the WWTP secondary
system. The project included converting three 2
MG existing oxidation ditches to energy efficient
fine bubble nitrifying/ denitrifying bioreactors. The
project doubled the treatment capacity, cut power
costs by half, fully nitrified and removed nitrates to
below 10 mg/L, and improved effluent turbidity.

The project construction cost was $15 million.

Dan also prepared documents for State Revolving
Loans for WPCF upgrades in 2013 and two water
recycling projects.

City of Auburn Treatment Improvements (2014-
2019). Project Manager for a $10 million upgrade
to the City of Auburn’s WWTP. The secondary
process upgrades will allow the city to treat 1.8
mgd to stringent ammonia and nitrate standards.

The project includes new fine screens, a
magnesium hydroxide feed system for alkalinity
addition, a new return sludge pump station, and
modifications to the stormwater pond system. The
new 2.3 MG ditch is designed for maximum energy
efficiency including 18-foot deep vertical walls,
vertical aerators with by variable frequency drives,
submersible mixers to mix contents during low
load conditions, online nitrate and ORP sensors to
match horsepower with influent loads, and a
separate anoxic basin to remove nitrates and
recover oxygen.

City of Colusa WWTP Recycled Water
Improvements (2014 - Current). Project Manager
for upgrades to the City’s 0.7 MGD WWTP and
sewer collection system. The plant improvements
include the addition of a new simultaneous
nitrification–denitrification facilities, secondary
clarifier, return sludge pumping, treated effluent
storage, and pumping and piping of tertiary
effluent to nearby alfalfa fields. Project cost is $14
million. The project will improve system reliability
and will allow the City to seasonally recycle its
water on agricultural lands. Dan also served as
PM for the 2013 renewal of its NPDES permit and
supporting technical studies.

City of Auburn UV Disinfection and Nitrogen
Removal Design (2009). Project Manager for an
upgrade to include new aeration controls,
nitrification/ denitrification facilities, pond
equalization facilities, and ultraviolet light
disinfection facilities. Project also included
successful pilot testing of adding methanol to the
plant’s existing sand filters to both filter and
denitrify the effluent.

Jackson Rancheria WWTP New Headworks
and Influent Pump Station (2016). Project
Manager new vertical screens, magnesium

ATTACHMENT A
274

Dan Rich P.E.

Principal Engineer

NEXGEN Utility Management, Inc.
hydroxide feed system, influent pump station, and
odor control system.

City of Auburn Tertiary Upgrades Design &
Construction (1997). Principal design engineer
and construction manager for new flocculation
basins and continuous backwashing sand filters
for the City of Auburn's Wastewater Treatment
Plant. The project provided 6 mgd of water
suitable for unrestricted reuse for downstream
agricultural users.

Cities of Reno & Sparks Wastewater Treatment
Plant Design (2000). Project manager and
principal design engineer for two high-rate
nitrifying trickling filters for the TMWRF (cities of
Reno and Sparks). The trickling filters are 88-foot-
diameter towers containing high-density plastic
media. The facilities are designed to treat 18 mgd,
and allow secondary effluent ammonia levels to be
reduced to below 0.5 mg/L.

City of Lincoln Wastewater Treatment Plant
Design (2004). Process Design Engineer for
tertiary and disinfection systems for a 4 mgd
WWTP for the City of Lincoln. Selected and
designed filters, chemical feed facilities, and UV
disinfection facilities. Design allowed treated
effluent to be used for unrestricted reuse on
nearby agricultural lands.

City of Merced Wastewater Treatment Plant
Design (2006). Process Design Engineer for
tertiary and disinfection systems for a 12 mgd ($35
million upgrade) WWTP for the City of Lincoln.

Selected and designed filters, chemical feed
facilities, and UV disinfection facilities. Design
allowed treated effluent to be used for unrestricted
reuse on nearby agricultural lands.

City of West Sacramento Wastewater
Treatment Plant Design (1998). Principal design
engineer and construction manager for a three-
compartment anoxic selector and new fine-bubble
diffused air system retrofit at the City of West
Sacramento WWTP. The project allowed the
WWTP to reliably nitrify and partially denitrify
effluent.

Wastewater Permitting Experience
Pacific Union College WWTP Title 22
Engineering Report (2022) – Recycled Water.

Project manager for preparation of the Title 22
Engineering Report. Submitted as part of the
recycled water permitting process, the report
contains information on the treatment, production,
transmission, and reuse of recycled water at the
PUC WWTP.

Mr. Rich has helped to successfully negotiate
Waste Discharge Requirements (WDRs) for the
following agencies:
✓ City of Auburn (2005, 2011, 2015, 2021).

NPDES Permit Renewal;
Because of NEXGEN’s permitting efforts
and the excellent operation at the WWTP,
the City now operates under the Municipal
General Order and NOA.
✓ City of Woodland (2009, 2013, 2019) NPDES
Permit Renewal; Industrial Pretreatment
Program Update (2010),

✓ City of Colfax (2010 and 2012) Industrial
Discharge Permit for brewery (2014)

✓ City of Colusa (2013, 2021) NPDES Renewal

Sewer System Management Plans (SSMPs)
• City of Palo Alto (current)
• City of Auburn (including updates)
• City of Colusa (including updates)
• City of Davis (SECAP support)
• City of Woodland (SECAP support)

ATTACHMENT A
275

Mark Cocke P.E.

Senior Engineer

NEXGEN Utility Management, Inc.

Mark has 36 years of experience in planning, designing, and evaluating processes for watershed hydrologic systems for stormwater, nonpoint pollution, and flood management.. He has recently specialized in water treatment process development, and design, performance evaluation, trouble-shooting, and NPDES compliance.

While working for the last 10 years at Nexgen Mark managed a $36 million recycled water program for the City of Colusa and a 10 million aquifer replenishment program at the Stockton East Water District.

Prior to Nexgen, Mark was a Senior Engineer at the City of Woodland and managed a $40 million program to rehabilitate all truck sewers, upgrade the City’s WWTP, and provide flood protection to the City.

Prior to Woodland, Mark was a national expert and senior at the USDA-National Resources Conservation Service. Mark served as USDA’s representative for the CalFed (now called Delta Plan) Interagency Development Team which defined the selected solution for the Sacramento and San Joaquin Delta. Mark was also part of the Governor’s Office of Planning and Research Task Force on Flooding and Disaster Planning.

EDUCATION

B.S. Civil Engineering, California State University,
Sacramento, California

REGISTRATIONS
Professional Civil Engineer No.040609, State of
California

PROJECT EXPERIENCE
Groundwater Recharge Experience
Stockton East Water Treatment Plant, Storage,
Perc Basin and Pipelines (2019). Mark was the
senior engineer and completed design and
construction support for new pipelines, control
valves, percolation and pretreatment basins at the
Stockton East Water Treatment Plant. The plant
has capacity to treat 60 mgd and serves several
hundred thousand residences and businesses in
Stockton.

The plant is supplied by two different water
sources that are conveyed in two separate 54 inch
and 60 inch transmission pipes. Our project added
a new 60 MG percolation and pretreatment basin
and eight large (36 inch, 48 inch, and 54 inch)
control valve structures to allow the water to be
automatically routed to different basins or
processes. About 5,000 feet of 48, 54 and 60-inch
cement lined and treated steel cylinder pipe was
designed and constructed. The system reliably
recharges 9,000 acre feet- year.

Mark has worked on 12 separate agricultural water
banking systems for farmers across the central
valley and has patented a horizontal recharge
system that allows recharge below and farming
above. These systems conservatively recharge
over 100,000 acre feet per year.

Wastewater Treatment Design Experience
City of Auburn Secondary Treatment
Improvements (2014 to 2019). Designer for parts
of a $10 million upgrade to the City of Auburn’s
WWTP. The secondary process upgrades will
allow the city to treat 1.8 mgd to stringent
ammonia and nitrate standards; this includes
developing specifications, and being the
responsible designer for the MLE Oxidation ditch,
and modifications to the stormwater pond system.

The new 2.3 MG ditch is designed for maximum

ATTACHMENT A
276

Mark Cocke P.E.

Senior Engineer

NEXGEN Utility Management, Inc.
energy efficiency. The Project includes integrating
the new assets into the existing NEXGEN AM
asset management system.

City of Woodland WWTP Improvements (2005-
2019) Since 2005, to 2014 as Senior Civil
Engineer for the City of Woodland Utilities Division
Mark worked on identifying I&I sources to the
WWTP facilities, Capital Improvement Plan, and
developing $2.5M worth of capital improvements
that resulted in a reduction of flows into the WWTP
of 1.5 mgd. In 2010-2013, Mark served as the
City’s PM for improvements to the WWTP
secondary system. The project construction cost
was $15 million. Mark served as the designer for
a $1.4 million pond project that cement and lime
treats the bottom of two 10-acre ponds and
constructs various piping and valving
improvements.

City of Colusa WWTP Recycled Water
Improvements (2014 - Current). Mark developed
a facilities plan for upgrades to the City’s 0.7 MGD
WWTP and sewer collection system. Mark is
designing the plant improvements that include the
addition of a new simultaneous nitrification–
denitrification facilities, secondary clarifier, return sludge pumping, treated effluent storage, and
pumping and piping of tertiary effluent to nearby
alfalfa fields. Project cost is $36 million.

Wastewater Master Planning Project
Experience
City of Woodland Sewer Master Plans and
Permit Renewals (2008, 2012). Asset
Management Plan For the Collection System
Project Manager for the City's Sewer Master Plan
and various updates. The project included
constructing a 2000 pipe dynamic flow-routing
model of the City's system and calibrating the
model with measured flows throughout the
collection system. The project identified capacity
bottlenecks, severity of I&I, and developed a
comprehensive (10 year) CIP. Project manager
for the integration of CCTV Data, GIS asset
attributes, SSO information, and other information
to develop a risk based loss of service model for
prioritizing collection system assets. This
information was used to develop graphical map
based information that was used to increase the
Collection System R&R program from $275k per
year to $2M per year.

Wastewater Permitting Experience
Mark developed the statistical information that
allowed for the removal of the selenium TSO that
was has successfully negotiated as part of the
Waste Discharge Requirements (WDRs) for the
City of Woodland:

City of Colusa Sewer Master Plan and
Permitting (2008, 2012). Project Manager for a
sewer and water system master plan for the City of
Colusa. Project involves surveying and inspection
of all trunk sewers, flow monitoring (8 sites),
hydraulic modeling, pump station condition
assessments, and CIP development.

Water Reclamation System Master Planning
City of Woodland Wastewater Master Plans
(2007, 2012). Project Manager for the City of
Woodland Wastewater Master Plan. The plan
included a detailed assessment of offsite odor
emissions and controls, regional reclamation
opportunities, new solids handling facilities, and
required facilities to treat 10.4 mgd of wastewater
flow to advanced tertiary levels.

Wastewater Permitting Experience
Mark developed the statistical information that
allowed for the removal of the selenium TSO that
was has successfully negotiated as part of the
Waste Discharge Requirements (WDRs) for the
City of Woodland:
✓ City of Woodland (2014) NPDES Permit
Renewal; SSMP (2008);
Urban Storm Water SB-5 Program
Implementation Development Committee:

City of Woodland representative on the Urban
Level of Flood Protection Work Group for
development of California Department of

ATTACHMENT A
277

Mark Cocke P.E.

Senior Engineer

NEXGEN Utility Management, Inc.

Water Resources Manual for implementation
of the Urban Storm Water Program.

Watershed Flood Management Planning
USDA NRCS Flood Management Plans for
Flood Damage Reduction in the following
Watersheds: Mark served as Team Leader, Civil
Engineer, and Hydrologist for developing solutions
to flood problems in the following areas of
California and Nevada. The plans included
detailed assessment the flood problem, solutions
development, analysis of environmental impacts
and costs. These Plans met NEPA and CEQA
guidelines for Project Documents.
✓ McCoy Wash EIS/EIR, Flood Management for
a 169 square mile watershed, near Blythe,
California. Selected Project was a 43 foot
high, 1,100 acre attenuation reservoir.
✓ Evans Creek EIS, Flood Management for a

4.5 square mile watershed near Reno,
Nevada. Selected Project was an 81 foot
high attenuation reservoir.
✓ Upper Penitencia Creek EIS/EIR, Flood
Management Plan for a 24 square mile
watershed in San Jose, California.

Selected Project was a combination of
levees, floodwalls and bypass channels.
✓ State of California Flood Awareness Mapping
Program, developed floodplain mapping for
five California Counties in areas with no
FEMA flood maps.

Watershed Resource Management Planning
USDA NRCS Non-point Source Pollution
Management Plan for Reduction of non-point
pollution in the Escondido Watershed: Project
entailed using GIS mapping to locate and quantify
sources, types, and amounts of sediment,
nutrients, stormwater from land uses in the
Escondido Creek Watershed in San Diego County.

The project required coordination with five Cities,
San Diego County, agricultural representatives,
and other NGO’s. The project was funded by the
California State Water Resources Control Board.

USDA NRCS Representative on State of
California Programs.
✓ CalFed Interagency Development Team,
worked on defining the selected solution for
the Sacramento and San Joaquin Delta.

This evolved into the present Delta Plan.
✓ Governor’s Office of Planning and Research
Task Force on Disaster Planning. This
group worked on developing new standards
for General Plans to address problems for
flooding and wild land fire inadequacies in
General Plan Standards.
✓ Governor’s Task Force on Dairy Waste Management
to address dairy waste generation in the
Sacramento and Joaquin Valley. Develop policy
to address groundwater and surface water
pollution from waste application by dairies.

Worked with State Agencies, Farm Bureau,
agricultural representatives, and other NGO’s on
developing best management practices to reduce
the impacts of dairy waste.

ATTACHMENT A
278

Joe DiGiorgio P.E.

Senior Engineer

NEXGEN Utility Management, Inc.

Joe has more than 35 years of experience as a project engineer, project manager, and construction manager.

He has primarily been involved in field investigations, and the design and construction of pipelines and facilities improvements for complex water and wastewater projects. His duties for public agency clients have also included planning tasks such as negotiating with permitting agencies, obtaining easements from property owners, and coordinating public outreach and environmental reporting. He also has extensive experience providing design services during construction and coordinating with construction crews and inspection staff.

He has served private clients as the engineer of record for sewer bypass plans and authored SSMP and UWMP documents for several agencies.

He enjoys working at a small responsive company to efficiently serve like-minded small and midsized public agencies and private companies.

EDUCATION
B.S., Engineering and Applied Sciences, California
Institute of Technology, Pasadena, California,
1980

Graduate Studies in Environmental Engineering,
California State University, Sacramento,
Sacramento, California, 1988, 1989, and 1995

REGISTRATIONS
Professional Civil Engineer #51439, State of
California

PROJECT EXPERIENCE

City of Wheatland – Regional Sewer Pipeline
Project (2020-Present). This $120 million
regionalization project is designed to convey the
entire City of Wheatland sewer flow to the OPUD
wastewater collection system approximately 5
miles to the north. It involves the replacement of
one sewer pump station at a constrained site, a
new large pump station with on-site equalization
storage, and a booster station to convey peak
flows to an OPUD pump station.

Joe’s work is primarily on the pump station design
and includes coordination with several other firms
and Cities’ staff on the pipeline design, WWTP
decommissioning, and necessary improvements at
the OPUD facilities. The work also requires
coordination with the development community,
State and other regional agencies for grant
funding, and PG&E for utility coordination,
including relocation of transmission lines.

The project incorporates self-cleaning wet well
design, extensive odor abatement, and SCADA
improvements that will incorporate the City of
Wheatland “satellite” lift stations in one unified
system that will allow full monitoring and
operations of the pumping systems from a new
central control building. The control building as
well as City maintenance facilities will be located
at the largest of the new Pump Stations.

City of Auburn Pump Station Improvements
(2020-Present)
✓ Vista del Valle PS (2020-21)
✓ Diamond Ridge PS (2022-23)
✓ SCADA Upgrades (System-wide) (2023)
The City of Auburn proactively budgeted to
refurbish their aging sewer pump stations at a rate
of one per year. This work typically requires
construction of a new submersible pump wet well
while the existing station remains in service, all on
constricted neighborhood sites.

Improvements are focused on replacing aging
equipment, increasing reliability, and incorporating
SCADA systems to allow remote monitoring and
operations. A key upgrade is the use of engine
driven pumps, in lieu of generators, to address
power outages and provide dual redundant
pumping capacity.

Joe’s work as Project Manager included design,
environmental (neighborhood) impact mitigation,
easement coordination, and bid and construction
services. The Vista del Valle project was bid

ATTACHMENT A
279

Joe DiGiorgio P.E.

Senior Engineer

NEXGEN Utility Management, Inc.
during the COVID lock downs and required an on-
line pre-bid “site visit” that Joe produced.

City of Auburn WWTP – 2020 Sludge
Dewatering Upgrades (2020-2023). Joe served
as Project Manager for this $7 million project
which replaced an aging belt filter press process
with a screw press in a new building and truck
loading dock. It also upgraded several other
WWTP facilities including major upgrades to the
plant water system, influent sewer bypass and
metering facility, and the RAS/WAS system.

The project included integration of the dewatering
facility into the WWTP SCADA system allowing
remote operation and monitoring of the process, a
screw conveyor loading system, and a process
pipe trench in the building to allow future process
modifications/additions and provide full
containment for chemical spills. The emergency
shower heating system is utilized to provide
hydronic floor heating to the main process room to
provide a comfortable winter working environment
even with full ventilation as required when
handling sludge.

Calaveras County Water District – West Point
and Wilseyville Wastewater Treatment
Facilities Consolidation Project (2021-2022).

Joe served as Project Manager for this project
which replaced an aging pond treatment system
with a pump station and pipeline to convey raw
sewage to an adjacent recirculating sand filter
WWTP. It also incorporates a septage receiving
and sludge handling facility at the WWTP. The
raw sewage pipeline is routed through
environmentally and historically sensitive areas.

The sludge handling facility includes dual
stabilization basins with a triple duty pump station
which can decant, recirculate/aerate, and remove
sludge from the basins. The removed sludge is
then dewatered in a series of draining dumpsters
which can be directly transported to off site
disposal or reuse sites, thereby minimizing WWTP
staff labor.

Joe’s work included coordination with State
funding staff for environmental clearance and he
assisted in obtaining a doubling of the initial $4
million grant to cover COVID related escalations in
construction costs.

City of Willows – Facilities Condition
Assessment for Sewer Collection System Lift
Stations and Wastewater Treatment Plant
(2021-2022). Joe was Project Manager for this
work which consisted of on-site inspection of the
City of Willows sewer lift stations and WWTP and
resulted in recommendation a series of staged
capital improvement projects, short term and long
term, so the City could set appropriate future
sewer rates and connection fees.

Major factors included wear and tear of facilities
and projection of remaining useful life, operator
and public safety, regulatory requirements, and
ease of maintenance. This was a competitively
bid project and was completed 5% under budget.

City of Colfax WWTP – Algae Removal Project
(2019 – Present). The Colfax WWTP has
significant equalization storage to manage large
I&I flows before tertiary treatment and discharge to
a sensitive mountain stream. Algae that grows in
the equalization basin has plagued the tertiary
filter systems as it tends to clog them and require
diversion of unfit effluent back to storage. Several
algae removal processes have been tried over 10
years and all failed due to clogging and
unsatisfactory performance.

This project, to be constructed in 2023, will utilize
the innovative SAF (Suspended Air Floatation)
system to remove algae without filtration. Joe
coordinated with the manufacturer to pilot test the
system at the WWTP and Joe designed the site
and process improvements required to fully
incorporate this process into the WWTP. Design
work also identified significant deficiencies in the
aging WWTP power distribution and SCADA
systems.

Joe, as Project Manager, worked with multiple
electrical engineers, City staff and system
integrators to design upgrades included in this
grant funded project to address the deficiencies
and allow full tablet based control of the facilities
both on and off site.

City of Dixon WWTP – Solids Handling Plan
(2022-2023). The 2017 Dixon WWTP
Improvements Project was completed with the
plan for waste sludge to be stabilized in basins

ATTACHMENT A
280

Joe DiGiorgio P.E.

Senior Engineer

NEXGEN Utility Management, Inc.
(SSB)which would be periodically drained and the
residual dried sludge sent to the local landfill.

Dixon is now planning to double the WWTP
capacity and with new State regulations that
discourage landfill disposal of organic wastes they
requested alternative plans for long term
sustainability in sludge handling.

Joe worked with WWTP staff, and used Nexgen’s
experience with other similar facilities, to carefully
assess operational data and special lab testing to
confirm that the SSBs can be drained and the
sludge dried in place to produce Class A
exceptional quality sludge without requiring
expensive additional processes. The exceptional
quality sludge will be utilized on-site on a 120 acre
field leased by a local farmer and/or be made
available to the local farmers as unrestricted soil
amendment/fertilizer, resulting in substantial long-
term savings to the City, compared to conventional
alternatives.

City of Auburn/CALTRANS – Highway 49
Roundabout Project (2020-Present). Caltrans is
constructing a new roundabout at a major State
Highway intersection in the City of Auburn. The
necessary site grading will hit existing sewer
piping, necessitating a realignment of sewer pipes
and manholes in the vicinity of the Project.

As Project Manager, Joe worked with Caltrans,
UPRR, City staff, and other utilities to design the
new sewer alignment which will be constructed in
early 2023.

Bodega Bay P.U.D. – Chlorine Bleach
Conversion Project (2022-Present). The
Bodega Bay WWTP currently uses gaseous
chlorine for disinfection. This project is to install a sodium hypochlorite facility as a safer and more
sustainable disinfectant.

As Project Manager, Joe evaluated the existing
structure and coordinated with WWTP staff to
develop a plan for a new fiberglass structure to
enclose the chemical storage tank and metering
pumps, while providing full containment in case of
tank failure. Joe also coordinated electrical design
work necessary to upgrade the existing electrical
distribution system and SCADA programming
necessary for this project.

Stockton East Water District – Phase 1 North
Site Groundwater Recharge Project (2017 to
2019). Joe was the lead engineer for design and
construction support for new pipelines, control
valves, percolation, and pretreatment basins at the
Stockton East Water Treatment Plant. This project
added a new 60 MG percolation and pretreatment
basin and eight large (36-inch, 48-inch, and 54-
inch) control valve structures to allow the water to
be automatically routed to different basins or
processes. About 5,000 feet of 48, 54 and 60-inch
cement lined and treated steel cylinder pipe was
designed and constructed.

The project was also the District’s first significant
design build project. Our team included a
specialized earthwork contractor that was able to
give the District a firm cost based on our 60%
design documents. The approach allowed the
project to be constructed on one year instead of
two, with zero change orders due to the nature of
the contract we negotiated with the contractor.

Georgetown Divide PUD – Auburn Lake Trails
WTP Improvement Project (2017-2019). Joe
provided on-site construction management and
inspection services throughout the course of the
$10.5 million water treatment plant construction
project. A key challenge was working with the
agency to keep the old failing plant on-line while
commissioning the new facilities with
inexperienced construction staff.

City of Dixon – Wastewater Treatment Plan
Permitting and Improvements Project (2005-
2017). Joe was responsible for developing the
studies and negotiating with the Regional Board to
rescind a precedent-setting Cease and Desist
Order related to salinity compliance. A series of
public hearings occurred over five years and
ultimately a process was selected that could meet
the salinity requirements at a savings to the
community of over $30 million compared with the
conventionally-proposed reverse osmosis process.

Joe continued to serve as Project
Manager/Designer on the $28.5 million WWTF
Improvements Project. This is a design that,
instead of utilizing an energy intensive and
expensive reverse osmosis system, replaces an
ageing pond system while conserving more than

ATTACHMENT A
281

Joe DiGiorgio P.E.

Senior Engineer

NEXGEN Utility Management, Inc.
30% of the City’s annual water use that was
previously lost to evaporation and returns it to the
local aquifer as high-quality recharge.

He also served as Construction Manager on this
project and worked with the Contractor after
bidding to value engineer the project to mitigate
cost escalations as the project was delayed by
years due to a citizens group legal challenges.

The value engineering changes involved a deletion
of $4 million from the bid project and an addition of
less than $3 million in alternative facilities for a net construction savings of more than $1 million,
thereby meeting the City’s funding budget for the
project.

This project included the design, environmental
permitting and construction monitoring of a 2.1-
mile-long 12” diameter water pipeline as a change
order when the planned on-site well became too
expensive to drill due to the drought. Defining
property owner constraints as well as coordination
with Solano County road agencies were important
to the successful installation of the water pipeline.

The project also included approximately 3,200 feet
of 24-inch gravity flow effluent pipe and 1200 feet
of 16- to 18-inch process pipe.

The entire existing WWTF was bypassed for the
duration of construction with a dual redundant
electric/diesel pump system rated at 1,800 gpm
capacity. The bypass system included a cellular
alarm monitoring system and operated as intended
for the duration of construction.

This project was completed in 2017 and was
recognized with the Envision Silver Sustainability
Award by the Institute for Sustainable
Infrastructure which evaluates all lifecycle phases
of the Project from planning through
decommissioning.

City of Lincoln – Wastewater Treatment Plant
Expansions. This project involved a series of
expansions of an aging existing WWTP over
several years as a new replacement facility was
constructed at another site as part of a major City
development expansion. A portion of the
expansion processes were located in proximity to
the new replacement facility so that they could be
incorporated as part of that facility and not “thrown
away”.

Joe’s work included I/I analysis, and design and
commissioning WWTP hydraulic and process
improvements. These included a 195 mg storage
reservoir, five-mile effluent pipeline, and 300 acres
of reclamation disposal fields. The 1.4 mgd
expansion was completed $100,000 under budget
and included an innovative wet well siphon
connection to return an abandoned pump station
to service. The effluent pipeline crossed a creek
with sensitive habitat. The 2.0 mgd expansion was
similarly under budget and included provision for a
final process expansion to 2.4 mgd. All of the
effluent disposal upgrades were incorporated into
the new Title 22 replacement facility.

City of Lincoln WWTRF – Phase 1 Earthwork
Project, Phase 2 WWTRF Project. Joe served on
this $7-million Phase 1 project involving the design
of the first portion of a new $40 million Phase 2
Title 22 treatment facility. Included are 250 mg of
storage basins approximately one-mile of large
diameter pipelines, and four pump stations that
provided interim disposal capacity for the City’s
existing WWTP. Excess fill from the construction
of the Phase 1 facilities were used to raise the site
of the Phase 2 facilities to be well above potential
flooding elevations.

Once the new Title 22 plant was built, these
facilities were integrated as emergency storage
and trace metals effluent compliance process
components. The basins were designed with
wetland marsh regions to complete a planned
adjacent wetland restoration area. The facility now
serves as a popular regional birding observation
area open to the public
Joe also served as a design engineer and
provided design services during construction and
start-up services for the new Title 22 treatment
facility. This facility included large process piping
installations: 600 LF of 36-inch, 1,600 LF of 42-
inch, 2,800 LF of 48-inch, 300 LF of 54-inch, 400
LF of 60-inch, and 200 LF of 66-inch PVC and T-
lock line reinforced concrete pipe.

ATTACHMENT A
282

Joe DiGiorgio P.E.

Senior Engineer

NEXGEN Utility Management, Inc.

City of Lincoln – Chambers and Douglas Drive
Project. This project involved approximately
2,500 LF of 30” diameter sewer pipe that was
designed to serve as a pressure force main to
initially convey flows from the old WWTP to the
new WWTRF disposal ponds. It was converted to
a gravity sewer line as downstream gravity pipes
up to 66” diameter were installed to the new
WWTRF and the old WWTP was taken off line.

Joe served as a design engineer and engineering
services during construction, including the 180 LF
creek crossing, and working with affected
landowners during construction.

City of Lincoln – Mid-West Placer Regional.

Pipeline Project. A key aspect of this
regionalization project involved the design of the
control facilities and on-site improvements for a
five-mile long recycled water distribution line to
local farms for crop irrigation. This project allows
for the Regional WWTRF to avoid discharges to a
sensitive stream when necessary for permit
compliance and provides a drought proof supply to
a local farm that can avoid pumping water from the
local over drafted aquafer. Joe coordinated
construction work with farming operations and
negotiated easements and State required recycled
water use agreements with property owners.

The raw sewage component was a 16-mile 22-
inch diameter force main which included a 66LF,
34-inch diameter jack and bore tunnel for a steel
casing pipe under State Hwy 193. The design
also had two horizontal direction drilling locations,
one 300 LF across Auburn Ravine Creek, the
other 200 LF across Doty Ravine.

City of West Sacramento – Sewer Force Main
Project. Joe served as a design engineer for this
project. Work included modeling a complicated
sewer force main system that pumped to an aging
WWTP located on the highest ground in the City.

The system and pump stations needed to be
modified to tie into the Sacramento regional gravity
trunk collection system. The modeling identified
optimum tie-in configurations and recommended
modifications to seven major pumping facilities.

Joe was also the design engineer to implement the
changes to the force main and pumping system as
the City decommissioned its WWTP and directed
sewage flow into the Sacramento Regional
system.

The design work came in well under budget as Joe
utilized the newly available Google Earth system
to produce construction drawings, instead of costly
ground and aerial surveys that were typical for
such work at the time.

Mountain House CSD - 30-Inch Water
Transmission Main, Main Pump Station, and
Booster Pump Station. Joe served as Project
Manager and Project Engineer for this project,
which was conceived to service a new community
and included a raw water intake pump station, 5-
mile-long 30-inch raw water pipeline and 2-mile-
long 30-inch potable water pipeline. Joe’s work
included design and engineering services during
construction, right of way acquisition; and
coordinating with three counties, State DWR, and
Federal BOR. The main pump station is located
on the Central Valley Project aqueduct just
upstream of the Banks pumping plant and required
30-foot-tall sheet piles and dewatering to
construct. Continuous access through the
construction work area was required to maintain
aqueduct operations.

The raw water pipeline crosses the Delta-
Mendota canal, a State Highway and UPRR
railroad tracks and then and parallels the UPRR
R/W. The crossing of the state highway and
UPRR tracks necessitated boring and jack
tunneling to install a 180 LF 42-inch diameter steel
casing pipe. Early coordination with UPRR and oil
pipeline owners avoided costly delays when fuel
contaminated soils were encountered.

The potable water pipeline continues parallel to
the UPRR tracks and Chevron fuel lines with two
perpendicular jack and bore tunnel locations to
install 42-inch diameter steel casing pipes under
the RR tracks, fuel lines and State Highway. One
was 144 LF the other 177 LF.

Joe also assisted with permitting work for the
community wastewater discharge to the sensitive
waters of the Delta.

Travis Air Force Base (AFB) – Building 1150
Pump Station Improvement (XDAT02-7505).

The AFB had been utilizing the pump station to

ATTACHMENT A
283

Joe DiGiorgio P.E.

Senior Engineer

NEXGEN Utility Management, Inc.
convey raw sewage to the City of Fairfield
collection system for years but were facing
increasing flows, rising maintenance costs, and
concerns for worker safety. A brand-new
replacement pump station proposed by another
firm was too expensive.

Joe evaluated the existing pumping structure for
concrete and metal corrosion, and structural
compliance with new equipment loading and
recent seismic code compliance and found the old
dry pit could be rehabilitated and converted to a
new wet well with submersible pumps at a 30%
total project savings. This project required a
bypass pumping plan on a 24-inch sewer that was
active for the duration of construction.

City of Fresno – Sewer Rehabilitation/Bypass
Project. Joe’s work was under contract to a
sewer slip-lining firm and consisted of third-party
engineering review of proposed sewer bypass
plans. Work included close coordination with City
sewer staff, affected home and business owners,
railroads and State transportation agencies.

Projects included:
✓ Milbrook & Ashlan Avenue; 15,675 LF of 18-
24-inch, 7 bypasses, 2,500 gpm, 4 weeks
each
✓ S. Maple Avenue; 989 LF of 27-inch, 2
bypasses, 1,100 gpm
✓ E. California & S. East Avenue; 2,271 LF of
30-inch, 4 bypasses, 1,000 gpm
✓ Garland Avenue; 2,750 LF of 27-inch, 2
bypasses, 2,000 gpm
✓ Iowa/Blackstone Avenue; 11,750 LF of 15 to
21-inch, 10 bypasses, 1,500 gpm
✓ N. Del Mar Avenue; 4,200 LF, 3 bypasses,
1,500 gpm
City of Stockton -North Stockton Interim Sewer
Improvement Project. Joe served as Project
Engineer during construction, primarily involved
with equipment troubleshooting and design
remedies during construction related to pump
vibrations. This project included improvements to
seven major pumping plants and installation of
large diameter gravity flow sewer pipes to 39 mgd.

The March Lane sewer improvement component
included monitoring installation of 5,180 LF of 18
to 24-inch sewer pipe in open trenches in a busy
thoroughfare and a 165 LF jack and bore 33-inch
diameter tunnel across Eldorado Street under
numerous utilities. Bypass and dewatering
pumping, as well as traffic control, were required.

City of Stockton – North Area Pump Stations
Control Modifications Project
Joe was Project Manager for this work which
involved analysis of the control modifications
required to integrate the network of North Area
pump stations with the nearly completed 66-inch
diameter Westside sewer project and design of
equalization storage facilities. Several North Area
pump stations were switched over to pump to the
Westside system to relieve a bottleneck in the
North Area System. The initial excess capacity
volume in the large diameter system was utilized
to provide equalization storage during peak sewer
flow events which allowed postponement of
bottleneck relief projects for years until funding
became available.

City of Woodlake - WWTP Improvements. Joe
provided design and engineering services during
construction for this $20 million project which
converted an existing pond treatment plant to
oxidation ditch activated sludge. He provided
inspection services for the local CM firm and
spoke at and coordinated the public dedication
event.

City of Woodland - WPCF Improvements (1987-
1989). This project converted the existing pond
treatment system to activated sludge. Joe worked
on the design of the oxidation ditches, pond
improvements, and the headworks. He also
provided design and engineering services during
construction.

City of Rio Vista – SSMP, SSMP Audit
City of Riverbank – SSMP
Joe worked with the client staff to author Sewer
System Management Plans in full conformance
with the State General Order. He presented
material and attended the associated public
hearings where the City Councils formally adopted

ATTACHMENT A
284

Joe DiGiorgio P.E.

Senior Engineer

NEXGEN Utility Management, Inc.
the plans/audits. Work also included coordination
with DWR staff to obtain State approval of the
adopted plans.

Presentations

California Water Environment Association 35th
Annual Pretreatment, Pollution Prevention and
Stormwater (P3S) Conference and Exhibition,
Long Beach, CA.; DiGiorgio J.B., Sundaram, V.
(2008) Residential Water Conditioning Technology
and its effect on wastewater effluent quality,
GRAC – Groundwater Salinity: A Groundwater
Dilemma, March 2009; Municipal Wastewater
Salinity Regulatory Compliance in an Agricultural
Setting: A $Million Question ??
California Water Environment Association 2010
Northern Regional Training Conference, Modesto,
CA; Pre-Conference Workshop - Salinity in the
Central Valley: Issues, Regulations, Perspectives
and Case Studies – Panel Member, appeared with
Mark Felton of Culligan Water in a joint
presentation and round table discussion.

California Water Environment Association 2011
Annual Conference, Ontario - Constituents of
Emerging Concerns; Sustainable Water Reuse
Practices. - Emerging Regulatory Issues; Salinity
Reductions Associated with Recent Water
Softener Source Control Efforts: Dixon, CA
Water Reuse National Conference (2017) Boise,
ID – Presented on alternative Biological Activated
Carbon treatment of recycled water to address
PFOS and other constituents of concern as an
economical alternative to reverse osmosis
processes. This included a discussion of Best
Practices to minimize salinization of groundwater
when recycled water is used for irrigation.

Other Experience

Technical Advisor for the 2008 WEF produced,
Emmy winning documentary, Salt of the Earth.

Participation on the Educational and Technical
committees of CV_SALTS for 10 years. Served as
Chair of the Education Committee and voting
member of the Executive Committee.

Technical Reviewer for Aquafornia
INFORMATION Desk Article - Salinity in the
Central Valley: A critical problem
Presenter and Coordinator - CV_SALTS Salinity
Workshops in Woodland, CA and Tulare, CA
In 1994 Joe became a Founder of the Sacramento
Chapter of APWA Educational Endowment Fund.

By 2020 the fund had grown to $1.5 million
allowing it to sustain periodic grants to local
universities and students to further civil and
hydraulic engineering education.

ATTACHMENT A
285

Melissa Lee P.E.

Senior Project Engineer

NEXGEN Utility Management, Inc.

Melissa Lee is a Project Engineer of NEXGEN Utility Management. Melissa has 20 years of permitting, planning, and design experience in a wide-range of water and wastewater projects. Areas of specialty include SRF funding, SSMPs, wastewater collection system master planning, I/I studies, hydraulic modeling, geographical information system (GIS), flow projection studies, NPDES permitting, and recycled water.

Melissa is in her third term as a member of the City of Sacramento Utilities Rate Advisory Commission.

EDUCATION
B.S. / Civil Engineering / University of California,
Davis, CA

REGISTRATION
Professional Civil Engineer No. 70060, State of
California

PROJECT EXPERIENCE
Sewer System Management Plans (SSMPs)
• City of Palo Alto (current)
• City of Auburn (including updates)
• City of Colusa (including updates)
• City of Davis (SECAP support)
• City of Woodland (SECAP support)
WWTP NPDES Permitting/Reports of Waste
Discharge
City of Colusa WWTP Receiving Water
Temperature Study (2022). The City’s NPDES
permit required a temperature study of how the
WWTP’s effluent was impacting receiving water.

Completed the study and report suggesting site
specific temperature limits for the receiving water,
which is intermittent and agriculturally dominated.

City of Colusa Groundwater Quality
Characterization Report (2021). Completed a
study statistically analyzing groundwater quality
characteristics and the City’s compliance with
groundwater limitations in the City’s NPDES
permit. The City is in compliance due to the
combined efforts of NEXGEN and City staff to drill
more wells, collect more data, and line effluent
storage ponds.

City of Colusa Copper Water Effect Ratio Study
(2017). Completed a copper water effect ratio
(WER) study to determine if copper in the effluent
discharge was toxic to aquatic life. The Regional
Water Quality Control Board (RWQCB) accepted
the study, applied the calculated ratios, and the
copper effluent limits were removed from the
WWTP NPDES permit.

City of Woodland Anti-degradation Analysis
and BPTC Evaluation for Groundwater
Protection (2021). Prepared an analysis to
determine the WWTP’s impact on the underlying
groundwater and if the WWTP is following BPTC.

Report prepared in accordance to the
requirements of the RWQCB.

City of Auburn Report of Waste Discharge
Renewal (2005, 2010, 2015, 2021) Because of
NEXGEN’s permitting efforts and the excellent
operation at the WWTP, the City now operates
under the Municipal General Order and NOA.

City of Woodland Report of Waste Discharge
Renewal (2008, 2013, 2019)
City of Colusa Report of Waste Discharge
(2013, 2021)
City of Biggs Report of Waste Discharge (2012)

Wastewater Collection System Projects
City of Wheatland Regional Sewer Alternatives
Analysis Report (2019). Helped manage the
analysis of several regional sewer alternatives for
the City as well as preparation and editing of the
final report.

City of Auburn Sewer System Capacity
Analysis for New Development (2017).

Completed a sewer system capacity assessment
and report for a small proposed development in
the City of Auburn.

City of Sacramento Infiltration and Inflow
Study. Project engineer for a wastewater flow

ATTACHMENT A
286

Melissa Lee P.E.

Senior Project Engineer

NEXGEN Utility Management, Inc.
monitoring requirements for the northern and
southern portions of the “Pocket Area”. Provided
extensive quality checking on the data.

Determined a correlation between the Sacramento
River stage and levels of infiltration in the
wastewater collection system.

City of Lincoln Infiltration and Inflow Study and
Wastewater Collection System Master Plan.

This project included an I/I study of the wastewater
collection system and subsequent master planning
documentation for the City of Lincoln.

Responsibilities included coordination with sub
consultant for flow monitoring requirements,
subsequent flow data and I/I analysis, I/I report
preparation, wastewater generation rate analysis.

Utilized GIS to estimate basin areas and complete
a pipe inventory.

City of Lathrop Wastewater Capacity
Verification Study (2007). Project engineer for a
citywide I/I study and flow study (12 meters).

Coordinated with sub consultant to conduct flow
and electrical conductivity (EC) monitoring for 6
months in the City of Lathrop. An I/I study was
also completed. The project also involved
collection of demographic and water use data to
determine average wastewater generation and
water use per household per day. This required
coordination with more than 6 developers and City
engineering staff. A portion of the project involved
surveying residents to determine number of
occupants per house. A Microsoft Access
database was developed for manipulation of data
and for future use by the City.

SWRCB SRF and USDA Funding
Community of Princeton (current). Applied for
SRF funding for Princeton, a small severely
disadvantaged community in Colusa County.

Working with the SWRCB to obtain grant funding
for permitting, planning, and construction.

City of Woodland SRF Funding for WWTP
Improvements (2014) and Recycled Water
Projects (2015, 2018). Prepared all documents
and forms related to applying for funding with the
State Water Resources Control Board Clean
Water State Revolving Fund (SRF).

City of Auburn SRF Funding for WWTP
Secondary Process Improvements (2014-2018).

Prepared all documents and forms related to
applying for funding with the State Water
Resources Control Board Clean Water State
Revolving Fund (SRF). I also prepare and submit
continuing documentation after funding is secured
such as quarterly reports, and documentation of
SWPPP and environmental compliance.

City of Colusa SRF Funding, USDA Grant
Funding, and Preparation of Petition for
Change of Water Rights for WWTP, Recycled
Water, and Collection System Improvements
(2015-2018). A USDA grant was obtained to help
fund planning efforts for the WWTP improvement
project. Prepared all documents and forms related
to applying for funding with the State Water
Resources Control Board Clean Water State
Revolving Fund (SRF) as well as the Petition for
Change of Water Rights relating to removing
wastewater effluent from receiving water for
reclamation. I also prepare and submit continuing
documentation after funding is secured such as
quarterly reports, and documentation of SWPPP
and environmental compliance.

Water System Analysis
Grizzly Flats Community Services District
Water Supply and Demand Study Update
(2018). Completed an updated analysis of water
supply and demand for the Grizzly Flats CSD
system based on recent hydrologic data. Current
and projected future water demands were
compared with the estimated annual safe yield and
firm yield water volumes available from water
sources.

Other Projects
City of Pittsburg Odor Study for New
Development (2022). Managed and helped
complete an odor study for a proposed
development near the landfill in Pittsburg, CA.

ATTACHMENT A
287
Jeremy Pollet, P.E.

Principal Engineer

Jeremy has 22 years of electrical engineering consulting experience specializing in process controls and industrial automation, SCADA systems, electrical power engineering, and project management.

Jeremy’s industrial sector experience includes water and wastewater treatment plants, pipelines, pump stations, electric power generation, cogeneration, discrete manufacturing, food processing, oil and gas production and refining.

EDUCATION
BS Electrical Engineering
University of New Orleans

REGISTRATION
REE 17557, California
REE 26128, Nevada

AREAS OF EXPERTISE
• Project Management
• Process Controls
• Industrial Automation
• SCADA Systems

RELEVANT EXPERIENCE
EL DORADO IRRIGATION DISTRICT WWTP EXPANSION. Licensed Electrical Engineer in responsible charge for the electrical power and controls design for a very large- scale Waste Water Treatment Plant expansion. Design documents included P&IDs, electrical one- lines, electrical power plans, conduit schedules, lighting panel and power panel schedules, lighting fixture schedules, installation details, and division 16 electrical specifications. In addition to multiple individual design responsibilities, this project involved direct management and supervision of a team of design engineers and technical assistants.

CITY OF MERCED WWTP EXPANSION. Electrical Engineer in responsible charge for the electrical power and controls design for a very large- scale Waste Water Treatment Plant expansion. Design documents included P&IDs, electrical one-lines, electrical power plans, conduit schedules, lighting panel and power panel schedules, lighting fixture schedules, installation details, and division 16 electrical specifications. In addition to multiple individual design responsibilities, this project involved direct management and supervision of a team of design engineers and technical assistants.

CITY OF AUBURN WWTP EXPANSION. Licensed Electrical Engineer in responsible charge for the electrical power and controls design for the City’s Waste W ater Treatment Plant expansion. Design documents included P&IDs, electrical one- lines, electrical power plans, conduit schedules, lighting panel and power panel schedules, lighting fixture schedules, installation details, and division 16 electrical specifications. Each of the following projects included contract drawings and specifications and the electrical scope included the PG&E metering section, standby generator with automatic transfer switch, pump control panel, power distribution panel, and associa
ted generator building electrical and lighting
infrastructure.

CITY OF AUBURN VINTAGE OAKS LIFT STATION. Designed the electrical facilities for a lift station featuring two (2) 110 HP sewage lift station pumps.

CITY OF AUBURN FALCON POINT LIFT STATION. Designed the electrical facilities for a lift station featuring two (2) 35 HP sewage lift station pumps.

CITY OF AUBURN OAKS LIFT STATION. Designed the electrical facilities for a lift station featuring two (2) 30 HP sewage lift station pumps.

ATTACHMENT A
288
CPE | Resumes – Jeremy Pollet, P.E., Principal Engineer Page 2 of 2

CITY OF AUBURN MONTECIELO LIFT STATION. Designed the electrical facilities for a lift station featuring two (2) 5 HP sewage lift station pumps.

CITY OF BIGGS WWTP EXPANSION. Licensed Electrical Engineer in responsible charge for the electrical power and controls design for a mid- sized Waste Water Treatment Plant expansion. Design documents included P&IDs, electrical one- lines, electrical power plans, conduit schedules, installation details, and division 16 electrical specifications.

CITY OF ST. HELENA WWTP EXPANSION. Licensed Electrical Engineer in responsible charge for the electrical power and controls design for a small -scale Waste Water Treatment Plant expansion. Design documents included P&IDs, electrical one-lines, electrical power plans, conduit schedules, installation details, and division 16 electrical specifications.

MADERA COUNTY WATER DELIVERY SYSTEM DESIGN. Licensed Electrical Engineer in responsible charge for the electrical power and controls design for a mid- sized water delivery system consisting of 4 wells, a storage tank, and booster pumps.

Design documents included P&IDs, electrical one- lines, electrical power plans, conduit schedules, installation details, and division 16 electrical specifications.

ARVIN-EDISON WATER DISTRICT CANAL CHECK STRUCTURES. Designed the electrical facilities for three water check/flow control structures. Projects included contract drawings and specifications and the electrical infrastructure included automated control panels, power distribution panels, radio telemetry, and associated area lighting.

AERA ENERGY, LLC POWER DISTRIBUTION MODELING. Developed power distribution models for six substation distributions encompassing over 50 miles of production wells and facilities.

AERA ENERGY, LLC POWER DISTRIBUTION CONSULTING. Provided electrical engineering recommendations for ongoing drilling program expansions including load- shifting, new transformer specifications, transformer resizing, and cost analysis.

AERA ENERGY, LLC WASTEWATER WELLS AUTOMATION AND ELECTRICAL POWER. Engineered and integrated a complete stand-alone solar powered station for monitoring a remote wastewater injection station. This project included a feasibility study on building new 12kV power vs. stand- alone solar power. Additional duties included developing ladder logic and a control-room SCADA system for process measurement and alarming.

AERA ENERGY, LLC GAS PLANT AUTOMATION AND ELECTRICAL POWER. Electrical engineer responsible for designing and integrating electrical and automation controls for production gas separation and cooling stations. Duties included sizing a bank of 12kV/480V transformers to feed the facility, lighting design collaboration, and developing ladder logic for PLC controls.

AERA ENERGY, LLC WATER PLANT ELECTRICAL CONTROLS UPGRADE. Developed the project scope, cost estimates, and engineering data for providing electrical and process controls upgrades on multiple pump stations, pipelines, and water storage tanks. Upgrades to the electrical equipment included new 4160V and 480V motor starters, controllers, breakers, and fuses. Other duties included project management and on- site startup support and commissioning.

ATTACHMENT A
289

Matt Boring,
Design Manager

Matt has 35 years of electrical and control system design and construction management experience in the water and wastewater industry. His industrial sector experience includes water and wastewater treatment facilities, conveyance pipelines, pump stations and SCADA systems.

Matt is known for working collectively with contractors and owners to resolve issues and keep projects on schedule. His good nature and experience during all project phases from planning through implementation contribute to his success. Matt enjoys seeing projects through to completion with satisfied owners and contractors.

EDUCATION
BS Electrical Engineering
University of New Orleans

REGISTRATION
REE 17557, California
REE 26128, Nevada

AREAS OF EXPERTISE
• Construction
Management
• Electrical Design
• Process Controls
• Industrial Automation
• SCADA Systems

RELEVANT EXPERIENCE
CITY OF RENO SCADA IMPROVEMENTS. Acted as lead designer, construction manager and inspector for the electrical and instrumentation upgrade to thirty of the City’s sewage lift stations. The new $1.2 million system replaced Motorola MOSCAD controllers and serial radio network. The new system is comprised of Allen Bradley controller connected by Cellular routers and was completed in house. System is built on an enterprise Inductive Automation Mission Critical Ignition system spanning the City Hall and Corporation yard, system includes a completely redundant system with backup SMS alarm and Voice modems.

C
ITY OF AUBURN WASTE WATER TREATMENT PLANT UPGRADE. Acted as the lead designer and electrical and instrumentation inspector for the electrical design of the $4.5 Million improvements project consisting of a new UV disinfection system, RAS pump station, SCADA and electrical system modifications and oxidation ditch energy efficiency improvements as well as a new secondary clarifier. Matt also preformed Field and factory testing as well as startup services for the project. Matt was responsible for managing the PLC programming and SCADA system integration. The SCADA system was converted from a Data Flow Systems to Inductive Automations Ignition redundant application as a part of the WWTRF expansion. System included the integration of three Allen Br adley PLCs connected by an Ethernet fiber network as well as a serial radio link to remote sites C
ITY OF COLUSA WASTE WATER TREATMENT PLANT UPGRADE. Served as Electrical Inspector and start up coordinator for the electrical facilities for a new $15.3 million tertiary wastewater treatment plant that replaced the City’s existing pond treatment system. The new plant included influent pumping, mechanical screening, extended air activated sludge (nitrification) secondary treatment, flow equalization, cloth disk tertiary filters, UV light disinfection, effluent pumping, aerated lagoon sludge storage, Managed and commissioned the installation of the Allen Bradley Control system with a Wonderware Interface.

T
RUCKEE MEADOWS WATER AUTHORITY MT. ROSE WATER TREATMENT FACILITY CONSTRUCTION ASSISTANCE Matt was engaged by the TMWA to assist their on- staff construction manager to assist with coordination between the design consultant the construction contractor. Duties will include detailed submittal reviews for electrical and controls equipment, change order cost reviews, assistance with contractor coordination, electrical observation/inspection and startup and commissioning. Project is currently in the construction phase and scheduled to be completed early 2020.

ATTACHMENT A
290
CPE | Resumes – Matt Boring, Design Manager Page 2 of 2

CITY OF WOODLAKE PHASE 1 WASTE WATER TREATMENT PLANT IMPROVEMENTS. Acted as the peer design reviewer and electrical and instrumentation inspector for the City’s WWTP improvements project. Matt was also responsible for startup and testing activities as well as overseeing the SCADA system development and installation. The project utilized Inductive Automations Ignition SCADA application which included a complete Mission Critical redundant system.

CITY OF WOODLAKE POTABLE WATER IMPROVEMENTS. Matt was responsible for securing the $200,000 Water system improvements project currently in the final design phase. The project includes replacing the control panels for seven well sites, two new well sites and two storage tanks. The remote sites will be integrated into the existing Ignition SCADA system at the recently expanded Wastewater Treatment Facility. The sites are connected via an Ethernet radio network relayed through a centrally located polling mater PLC at the corporation yard. Matt will be providing design services as well as building and installing the new control panels.

C
ITY OF LIVE OAK WASTE WATER TREATMENT PLANT UPGRADE. Served as electrical inspector and SCADA installation manager for a $17.7 million tertiary wastewater treatment plant upgrade project at the City’s existing aerated pond treatment plant. The plant improvements include influent flow mechanical screening, extended air activated sludge (nitrification) secondary treatment, flow equalization, cloth disk tertiary filters, UV light disinfection, effluent pumping, integrated Wonder Ware SCADA system upgrade and improvements that include several off -site facilities.

MIDWESTERN PLACER REGIONAL WASTE WATER TREATMENT PLANT EXPANSION. Matt provided instrumentation and SCADA system design for this multi -faceted $19 million regionalization project, which included a 29.5 MGD pump station, conveyance pipeline with odor control facility and an expansion of the City of Lincoln Wastewater Treatment and Reclamation Facility. Matt was responsible for engineering services during construction for all instrumentation and SCADA portions of the project. He was also responsible for managing PLC control programming for the Allen Bradley control system and all Wonderware and Ignition SCADA integration. Project scope has since been modified to include a complete SCADA system upgrade to the Inductive Automations Ignition SCADA application which included approximately 24,000 tags.

Z
ONE 7 WATER AGENCY CHAIN OF LAKES WELL NO. 5 FACILITY. Design of the electrical and control systems for groundwater pump station and piping to connect to existing raw water transmission line. Project entailed a 500HP municipal production wells , well building, and remote communication over a fiber optic network. Final well production ranged to 1,500 gpm. Matt worked closely with Contractor and Agency staff to design improvements in an expedited design/build project approach.

PLACER COUNTY WATER AGENCY ZONE 1 IMPROVEMENTS PROJECT. Design of electrical and control system s to retrofit existing 900 gpm drinking water well and disinfection system and new 900 gpm drinking water well on separate site. These wells are utilized to supplements the existing PCWA drinking water distribution system in western Placer County.

CITY OF BISHOP WATER SYSTEM SCADA IMPROVEMENTS. Served as project manager and lead designer for the City’s turn turnkey $175K SCADA installation. Initial system included five facilities communicating via licensed 250mHZ serial radios.

System includes integration of Inductive Automation’s Ignition Java based SCADA platform communication with Allen Bradley PLC’s in the field. Project has evolved since inception to include a total of eight facilities including the City’s wastewater treatment facility. Improvements include energy efficiently controls which have saved the City approximately 30% in utility charges for the Well 2 facility. Matt with cooperation from the City installed the complete system without the need to outsource any construction activities.

ATTACHMENT A
291

Redding Resume | 1

SCOTT REDDING, PLA
Principal Landscape Architect/Group Manager
Mr. Redding has 25 years of experience working on public and private projects with a focus on parks and recreation facilities, civic and institutional facilities, educational facilities, infrastructure/utilities, master planned communities, and commercial properties. His roles have included project
management, conceptual design, construction documentation, bid support services, and construction administration. In support of public projects, he has led the community and stakeholder outreach efforts through facilitating meetings, workshops, open houses, focus groups, and pop-up events both virtually and in-person to elicit feedback, communicate project updates, and inform the public. Mr. Redding practices sustainable landscape architecture and enjoys working with communities and stakeholders to improve and enhance the quality of public spaces, and to build healthy, vibrant, and resilient communities.

Carson Creek Preserve (2023 - 2024). Principal Landscape Architect for the preparation of landscape construction documents for the restoration of five acres of native riparian habitat within the 127-acre Preserve established pursuant to USACE and CDFW special conditions. Plans required coordination and compliance with the El Dorado Irrigation District standards due to the recycled water service connection. Plans were prepared in coordination with HELIX’s Construction Group to ensure the design incorporated equipment and materials that are cost efficient and easily maintainable while minimizing habitat disturbance upon removal. Work performed for Lennar.

Saddleback Meadows Mitigation Landscape Plans (2023 - 2024). Principal Landscape Architect for the preparation of construction documents for the implementation of the Habitat Mitigation and Monitoring Plan (HMMP) per the requirements of the U.S.

Army Corps of Engineers, U.S. Fish and Wildlife Service, California Department of Fish and Wildlife, and Regional Water Quality Control Board. The landscape plans include the creation and enhancement of 51-acres of coast live oak woodland, coastal sage scrub, mule fat scrub, ephemeral pond, and streambed. Work performed for Capital Guidance Corporation with the County of Orange as the lead agency.

Daley Ranch Restoration Plan Support (2023). Principal Landscape Architect for the preparation of construction documents for the restoration of the ¼-acre site within the Daley Ranch Conservation Area. Services include the development of planting and temporary irrigation plans for the encroachment of a dedicated conservation easement including proposed installation and monitoring methods. Work performed for the City of Escondido.

Altair Permitting and Pre-Construction Surveys (2023). Principal Landscape Architect for the preparation of landscape construction documents for the restoration of wetland and native vegetation communities as mitigation for an adjacent residential development in the City of San Marcos, San Diego County. The design includes restoring habitats that will be temporarily impacted during site grading so that they

EDUCATION
Bachelor of Landscape
Architecture, University
of Guelph, Ontario,
Canada, 1999

CERTIFICATIONS
Professional Landscape
Architect, CA No. 4874
ReScape Qualified
Professional (RQP) in
Landscape Design
Certificate of
Entrepreneurship,
University of the Pacific,
Stockton
Leadership Essentials
Certificate, Cornell
University

PROFESSIONAL

AFFILIATIONS
City of Sacramento
Design Advisory Board
Member
Past Vice President of
the Sierra Chapter of
the American Society of
Landscape Architects
Past Member of the
Emerging Professionals
Professional Practice
Network of the
American Society of
Landscape Architects
Member of the
Community Design
Professional Practice
Network of the
American Society of
Landscape Architects

ATTACHMENT A
292

Redding Resume | 2

blend with the adjacent uplands to allow for a transitional habitat buffer. Habitat establishment and enhancement will include temporary irrigation and the installation of container plantings and seed. Work performed for Brookfield Residential.

Irvine Hicks Canyon Channel Restoration (2023 - 2024). Principal Landscape Architect for the preparation of final construction documents based on preliminary landscape plans by others. Areas to be planted and irrigated are limited to those impacted by the proposed grading of the channel slopes to prevent further erosion and to protect the adjacent residential properties along the southern edge of the channel. Planting will include native riparian and riparian transition vegetation as prescribed in the Habitat Mitigation and Monitoring Plan. Work performed for BKF Engineers with the City of Irvine as the project owner.

Wheatland Pump Station Landscape Screening (2022 - 2023). Project Manager for conceptual plans and landscape construction documents for screening around three sewer pump stations located in the City of Wheatland, Yuba County. Work included recommending plants and trees for screening frontage and perimeter using native/low water use plants, irrigation plan, water use calculations and watering recommendations, and fencing recommendations. Work performed as a subconsultant to Nexgen Utility Management with the City of Wheatland as the project owner.

Sacramento Community Center Theater Renovation (2010 - 2021). Principal Landscape Architect and Project Manager as part of the design-build team with DLR Group (architect) and Turner Construction (general contractor). Services included site inventory/analysis, conceptual design, presentation graphics, construction documents, bidding, and construction administration services. The landscape improvements included the street frontages along L, 13th, and 14th Streets as well coordination of the K Street improvements with the landscape architecture firm for the adjacent expansion of the Sacramento Convention Center. Work was performed for the DLR Group with the City of Sacramento as the lead agency.

CSUS Humboldt Hall Demolition (2021 - 2022). Principal Landscape Architect for the site analysis, conceptual design, construction documentation, and construction administration for the demolition of an existing 2-story structure and the subsequent site restoration and utility terminations. Improvements included new walkways, seating areas and drought-tolerant landscaping with educational signage. Work was performed for DGA (architect) and California State University, Sacramento as the project owner.

CAL Fire South Area Operations Headquarters (2010 - 2018). Principal Landscape Architect for the preparation of CAL Fire compliant construction documents for a new ten building LEED certified operations complex based in Riverside County. The landscape improvements consisted of street frontage and entry improvements, outdoor staff break areas/courtyards, stormwater detention facilities, drought tolerant planting, and irrigation. Work was performed for CAL Fire who is also the project owner.

Pittsburg Multi-model Transit Facility (2016 - 2017). Principal Landscape Architect responsible for the conceptual design, community outreach, presentation graphics, construction documents, and construction administration for a new transit facility in Pittsburg, Contra Costa County. The project provides a safe and accessible transportation connection to the nearby BART station and includes public space improvements to support place-making into the downtown core. Features include an iconic vertical monument sign with digital community message board, parking lot, bike lockers/racks, various seating areas, bus drop-off shelter, soundwall screening, and secondary entry monument signage. The project also included a connection to an existing Class 1 bike trail north of the site. The project follows the City’s Green Building Guidelines and incorporates storm water infiltration swales within planting areas that capture/filter runoff. Work was performed for TranSystems with the City of Pittsburg as the lead agency.

ATTACHMENT A
293

Owning Resume | 1

LESLEY OWNING
Principal Planner
Ms. Owning is an Environmental Planning Group Manager and Principal Planner with twelve years of experience in the provision of all types of California Environmental Quality Act (CEQA)/National Environmental Policy Act (NEPA)
documentation for a variety of project types including
restoration; parks and recreation; transportation;
infrastructure improvement; renewable energy; and residential and commercial land development;. Ms. Owning also develops CEQA review and strategy plans for private and public clients early on in the project planning phase and prepares project site constraints analyses.

Ms. Owning has managed controversial land development projects and provided public agency support through project appeal hearings. She has led response to comments for projects that have generated hundreds of public comments and maintained thorough administrative records for projects that are anticipated to face legal challenges. Ms. Owning stays abreast of recent CEQA case law and changes to the State CEQA Guidelines and requirements through on-going education and participation in professional environmental planning groups and conferences.

City of Modesto Municipal Groundwater Supply Contamination Prevention and Cleanup Project (2022 - 2023). Senior Environmental Planner for the preparation of a CEQA Compliance Review and Strategy Memorandum for the Modesto Municipal Groundwater Supply Contamination Prevention and Cleanup Project. Reviewed engineering documents and relevant plans including the City of Modesto Wastewater Master Plan DEIR and the General Plan Master EIR. Senior Advisor for the preparation of an IS/MND and supporting technical studies. The project includes the construction of five managed aquifer recharge (MAR) basins within the City of Modesto that are intended to support the replenishment of groundwater supplies with clean water to address groundwater quality issues associated with arsenic, uranium, and nitrates.

Work was being performed as a subconsultant to Trihydro Corporation in close coordination with the City of Modesto as the lead agency.

City of Yuba City, Aquifer Storage and Recovery Well Project CEQA Support (2023).

Senior Environmental Project Manager for the preparation of a CEQA IS/MND and supporting biological resources, cultural resources, and noise/vibration technical studies for the Aquifer Storage and Recovery (ASR) Well Project in the City of Yuba City. To close the gap between future water supply and demand and maximize their allocation of water during wet years, the City proposes to construct an ASR system with a new injection well and associated infrastructure at the WTP site. The new ASR system will capture water when it is abundant, such as during a rainy season or spring snowmelt, and store water in an underground aquifer to allow for the recovery of that water when needed. HELIX is supporting the City through CEQA processing and regulatory permitting. Work is being performed as a subconsultant to Carollo Engineers in close coordination with the City of Yuba City as the lead agency.

EDUCATION
Bachelor of Science,
Environmental
Economics & Policy;
Minor-City and Regional
Planning, University of
California, Berkeley,
2013
Geographic Information
System Certified, San
Francisco State
University, 2015

PROFESSIONAL

AFFILIATIONS
Association of
Environmental Planners

ATTACHMENT A
294

Owning Resume | 2

Angels Camp Sewer Line Collection System Improvement & Replacement (2019 - 2020). Project Manager for preparation of an IS/MND and supporting biological resources, cultural resources, air quality/GHG/odor, and noise/vibration technical studies for a sewer line replacement project. The City is replacing and upsizing approximately 6,012 linear feet of deteriorating sewer line to allow the City’s wastewater treatment plant to operate at full capacity, thereby preventing wastewater spills into Angels Creek. Project was approved unanimously by City Council in April 2020. Following City receipt of additional funding, responsibilities included overseeing the preparation of an aquatic resources delineation report and 1602 Streambed Alteration Agreement from CDFW as the project will remove an existing pipe crossing and introduce a new pipe crossing over a tributary to Angels Creek. Work performed for the City of Angels Camp.

Harney Lane Bridge Scour Mitigation Across Paddy Creek (2023). Project Manager for environmental documentation for replacement of the current in-stream scour protection, which consists of quarry rocks and non-engineered rip-rap that have become eroded over time. The current scour mitigation was put in place by County maintenance crews to protect the bents and the banks at the abutments until proposed project improvements could be installed. Due to channel degradation over time, the top of the west abutment footing has become exposed, and there has been approximately three feet of channel degradation in the thalweg and around the bents. Managed all contracted tasks including the preparation of an Aquatic Resources Delineation, Air Quality/Greenhouse Gas Emissions Letter Report, and CEQA IS/MND; Assembly Bill 52 consultation support; regulatory permitting for a Section 404 Nationwide 14 Permit, Section 401 Water Quality Certification, and CDFW Section 1602 Streambed Alteration Agreement; as well as biological monitoring. Work performed for the County of San Joaquin Public Works Department.

Sherman Island Whale’s Spout Wetlands Restoration (2023). Senior Environmental Project Manager overseeing the preparation of a Section 106-compliant Cultural Resources Assessment to support a proposed wetland restoration site in the San Joaquin Delta area of Sacramento County. Role includes close coordination with the Ducks Unlimited Project Manager regarding project’s potential impacts to known cultural resources on-site, support with tribal consultation, and advising on the potential for the project to qualify for a CEQA Statutory Exemption for Restoration Projects (SERP). Work is being performed for Ducks Unlimited in association with the Department of Water Resources.

Manzana Creek Restoration Pilot Project (2022 - 2023). Senior Environmental Project Manager overseeing the preparation of a Botancial Biological Assessment (BA)/Biological Evaluation (BE), Wildlife BA, Wildlife BE, Management Indicator Species Report, Section 106-compliant Cultural Resources Assessment, and NEPA Categorical Exclusion (NEPA CE) to support habitat restoration associated with drainage and culvert repairs in the Manzana Creek Area of the Los Padres National Forest. Role includes development of the project description and NEPA CE, management of the multi-disciplinary project team, senior review of all project deliverables, and coordination with the Los Padres National Forest staff. Work is being performed for the South Coast Habitat Restoration group in close coordination with the Forest Service.

Aramis Solar Energy Generation and Storage Project EIR (2018 - 2021). Project Manager for preparation of an EIR for the construction and operation of a solar energy generation and storage project on 410 acres in unincorporated North Livermore, Alameda County. Led the preparation of the EIR and managed the preparation of the biological resources, cultural resources, air quality/greenhouse gas, and noise technical reports that were completed in-house as well as the traffic study prepared by a subconsultant. Other responsibilities included frequent coordination with the Alameda County Planning Department staff, project applicant, and multi- disciplinary project team as well as presenting and responding to public comments at the scoping meeting, public comment hearing, project approval hearing, and project appeal hearing. Work performed for Intersect Power, with the County of Alameda as the CEQA lead agency.

ATTACHMENT A
295
3140 BEACON BLVD ● WEST SACRAMENTO, CA 95691 ● TELEPHONE 916/371-0434 ● FAX 916/371-1809

MATTHEW S. MOYNEUR, PE, GE
Senior Engineer / CEO

Mr. Moyneur has over 19 years of experience in geotechnical engineering and field construction monitoring in Michigan, Ohio, and California. His projects have included coordinating and performing geotechnical evaluations for schools; hospitals; retail and commercial developments; athletic complexes; industrial facilities; residential developments; infrastructure; and, underground utilities.

He has performed field construction monitoring of shallow and deep foundations, earthwork operations, and earth retention systems. Mr. Moyneur experience coordinating and performing geotechnical evaluations for new construction, as well as evaluating existing distressed structures. Mr. Moyneur is a former Chair and current Secretary of the Sacramento Section Geo-Institute and a member of the American Society of Civil Engineers.

EDUCATION

University of California, Los Angeles
Master of Science in Geotechnical Engineering (2004)

University of California, Los Angeles
Bachelor of Science in Civil and Environmental Engineering (2002)

EXPERIENCE

August 2023 - Present Raney Geotechnical, Inc. – West Sacramento CEO, Managing Partner, Senior Engineer

July 2007 – July 2023 Wallace-Kuhl & Associates (WKA) / Universal Engineering Sciences (UES) – West Sacramento
Project Engineer, Senior Engineer,
Earthwork Department Manager

September 2003 – June 2007 Soil and Materials Engineers, Inc. (SME), Plymouth, Michigan
Senior Engineer

PROFESSIONAL REGISTRATION

Professional Engineer, No. 54255 (Michigan)
Professional Engineer, No. 72179 (California)
Geotechnical Engineer. No. 2920 (California)

PROFESSIONAL AFFILIATIONS

American Society of Civil Engineers
ASCE Sacramento Section Geo-Institute
ASFE Fundamentals of Professional Practice (FOPP) Graduate

ATTACHMENT A
296

Appendix B
Gateway Pacific Licensing and Insurance
Requirements, Bondability and Bank Letters

ATTACHMENT A
297

ATTACHMENT A
298

ATTACHMENT A
299

ATTACHMENT A
300

ATTACHMENT A
301

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

INSURER(S) AFFORDING COVERAGE
INSURER F :

INSURER E :

INSURER D :

INSURER C :

INSURER B :

INSURER A :

NAIC #
NAME:

CONTACT
(A/C, No):

FAX
E-MAIL
ADDRESS:

PRODUCER
(A/C, No, Ext):

PHONE

INSURED
REVISION NUMBER:CERTIFICATE NUMBER:COVERAGES
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

OTHER:
(Per accident)
(Ea accident)
$
$
N / A
SUBR
WVD
ADDL
INSD

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. $ $
$
$PROPERTY DAMAGE
BODILY INJURY (Per accident)
BODILY INJURY (Per person)

COMBINED SINGLE LIMIT

AUTOS ONLY

AUTOSAUTOS ONLY

NON-OWNED

SCHEDULEDOWNED

ANY AUTO

AUTOMOBILE LIABILITY
Y / N

WORKERS COMPENSATION

AND EMPLOYERS' LIABILITY
OFFICER/MEMBER EXCLUDED?
(Mandatory in NH)
DESCRIPTION OF OPERATIONS below
If yes, describe under

ANY PROPRIETOR/PARTNER/EXECUTIVE
$
$
$
E.L. DISEASE - POLICY LIMIT
E.L. DISEASE - EA EMPLOYEE
E.L. EACH ACCIDENT
ER
OTH-

STATUTE
PER

LIMITS(MM/DD/YYYY)

POLICY EXP
(MM/DD/YYYY)

POLICY EFF

POLICY NUMBERTYPE OF INSURANCELTR
INSR
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)

EXCESS LIAB
UMBRELLA LIAB $EACH OCCURRENCE
$AGGREGATE
$
OCCUR

CLAIMS-MADE
DED RETENTION $
$PRODUCTS - COMP/OP AGG
$GENERAL AGGREGATE
$PERSONAL & ADV INJURY
$MED EXP (Any one person)
$EACH OCCURRENCE

DAMAGE TO RENTED
$PREMISES (Ea occurrence)

COMMERCIAL GENERAL LIABILITY

CLAIMS-MADE OCCUR
GEN'L AGGREGATE LIMIT APPLIES PER:

POLICY PRO-

JECT LOC

CERTIFICATE OF LIABILITY INSURANCE

DATE (MM/DD/YYYY)

CANCELLATION

AUTHORIZED REPRESENTATIVE
ACORD 25 (2016/03)
© 1988-2015 ACORD CORPORATION. All rights reserved.

CERTIFICATE HOLDER
The ACORD name and logo are registered marks of ACORD
HIRED

AUTOS ONLY
1/3/2024
InterWest Insurance Services, LLC
1550 Parkside Dr Ste 240
Walnut Creek CA 94596
Sara Swanson, CISR
707-794-7409
707-794-7409
[email protected]
License#: 0B01094
Hartford Fire Insurance Co
19682
GATEPAC-01
Trumbull Insurance Company
27120
Gateway Pacific Contractors, Inc.
8055 Freeport Blvd
Sacramento CA 95832
Hartford Casualty Ins Company
29424
Indian Harbor Insurance Co
36940
American Fire & Casualty Co
24066
Insurance Co. of the West
27847
1718262675
A
X
2,000,000
X
300,000
5,000
2,000,000
4,000,000
X
Y
Y
57UEABA0ZG5
1/1/2024
1/1/2025
4,000,000
B
1,000,000
X
X
X
Y
Y
57UEACI8059
1/1/2024
1/1/2025
C
X
X
10,000,000
Y
57RHABA0ZGE
1/1/2024
Y
1/1/2025
10,000,000
X
10,000
F
X
Y
WSA507495900
1/1/2024
1/1/2025
1,000,000
1,000,000
1,000,000
D
D
E
Pollution Liability
Professional Liability
Secondary Excess
Y
Y
PEC002098017
PEC002098017
ECA64072578
1/1/2024
1/1/2024
1/1/2024
1/1/2025
1/1/2025
1/1/2025
Per Claim/Aggr/SIR
Per Claim/Aggr/SIR
Ea Occ/Aggr
$5,000,000/$25,000
$5,000,000/$25,000
$15,000,000
Additional Insured status applies to requested entities if required by written contract per the attached policy form/endorsement(s). Waiver of subrogation applies to requested entities if required by written contract per the attached policy form/endorsement(s). Primary non-contributory applies to requested entities if required by written contract per the attached policy form/endorsement(s). Excess/Umbrella follows form to primary policies.

Evidence of Coverage
Evidence of Coverage

ATTACHMENT A
302

STATE OF CALIFORNIA

DEPARTMENT OF INDUSTRIAL RELATIONS

DIVISION OF OCCUPATIONAL SAFETY AND HEALTH

ANNUAL PERMIT
Permit Issued To
No.

Date
Region
District
Tel.

Type of Permit
Pursuant to Labor Code Sections 6500 and 6502, this Permit is issued to the above-named employer for the projects described below.

State Contractor’s License Number Permit Valid through
Description of Project Location Address City and County Anticipated Dates Starting Completion

1. That the work is performed by the same employer. If this is an annual permit the appropriate District Office shall be notified, in writing, of dates and location of job site prior to commencement.

2. The employer will comply with all occupational safety and health standards or orders applicable to the above projects, and any other lawful orders of the Division.

3. That if any unforeseen condition causes deviation from the plans or statements contained in the Permit Application Form the employer will notify the Division immediately.

4. Any variation from the specification and assertions of the Permit Application Form or violation of safety orders may be cause to revoke the permit.

5. This permit shall be posted at or near each place of employment as provided in 8 CCR 341.4 Investigated by
Safety Engineer Date
Approved by Date
Received From Received By
Cash
Check
Amount Date
This Permit is issued upon the following conditions:

No: 2024-
Gateway Pacific Contractors Inc
8055 Freeport Blvd
Sacramento CA 95832-9716
(916) 665-4100
2 1
(916) 263-2800
517988
1/26/2024
900501
Gary A Bechtel
094841 1/26/24X
T1-ANNUAL TRENCH/EXCAVATION
Various
Statewide
$100.00 District Manager/Permit Unit
Permit Unit
January 26, 2025
Jan 26, 2025Jan 26, 2024
1/26/2024
Conditions of Issuance:

Gary A BechtelAttn: Safety Mgr or

ATTACHMENT A
303

OF COMPLETION
IN RECOGNITION OF SUCCESSFUL COMPLETION IN:

CPR / AED / First-Aid
(Adult / Child / Infant / Choking)
AED / Injury & Universal Precautions
THIS CERTIFICATE IS PROUDLY PRESENTED TO:

Jay Hall
The above mentioned Student is now certified in the above mentioned course by demonstrating proficiency in the subject by passing the examination in accordance with the Terms & Conditions of National CPR Foundation - Valid for 2 years. Course administered in accordance with the ECC/ILCOR and AHA® guidelines. ID#: 23D25D42020 COURSE PROVIDED BY:

Completion: October 4, 2022
Instructor: Paul J. Scruton
Signature:

ATTACHMENT A
304
Preview

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

INSURER(S) AFFORDING COVERAGE
INSURER F :

INSURER E :

INSURER D :

INSURER C :

INSURER B :

INSURER A :

NAIC #
NAME:

CONTACT
(A/C, No):

FAX
E-MAIL
ADDRESS:

PRODUCER
(A/C, No, Ext):

PHONE

INSURED
REVISION NUMBER:CERTIFICATE NUMBER:COVERAGES
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

OTHER:
(Per accident)
(Ea accident)
$
$
N / A
SUBR
WVD
ADDL
INSD

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. $ $
$
$PROPERTY DAMAGE
BODILY INJURY (Per accident)
BODILY INJURY (Per person)

COMBINED SINGLE LIMIT

AUTOS ONLY

AUTOSAUTOS ONLY

NON-OWNED

SCHEDULEDOWNED

ANY AUTO

AUTOMOBILE LIABILITY
Y / N

WORKERS COMPENSATION

AND EMPLOYERS' LIABILITY
OFFICER/MEMBER EXCLUDED?
(Mandatory in NH)
DESCRIPTION OF OPERATIONS below
If yes, describe under

ANY PROPRIETOR/PARTNER/EXECUTIVE
$
$
$
E.L. DISEASE - POLICY LIMIT
E.L. DISEASE - EA EMPLOYEE
E.L. EACH ACCIDENT
ER
OTH-

STATUTE
PER

LIMITS(MM/DD/YYYY)

POLICY EXP
(MM/DD/YYYY)

POLICY EFF

POLICY NUMBERTYPE OF INSURANCELTR
INSR
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)

EXCESS LIAB
UMBRELLA LIAB $EACH OCCURRENCE
$AGGREGATE
$
OCCUR

CLAIMS-MADE
DED RETENTION $
$PRODUCTS - COMP/OP AGG
$GENERAL AGGREGATE
$PERSONAL & ADV INJURY
$MED EXP (Any one person)
$EACH OCCURRENCE

DAMAGE TO RENTED
$PREMISES (Ea occurrence)

COMMERCIAL GENERAL LIABILITY

CLAIMS-MADE OCCUR
GEN'L AGGREGATE LIMIT APPLIES PER:

POLICY PRO-

JECT LOC

CERTIFICATE OF LIABILITY INSURANCE

DATE (MM/DD/YYYY)

CANCELLATION

AUTHORIZED REPRESENTATIVE
ACORD 25 (2016/03)
© 1988-2015 ACORD CORPORATION. All rights reserved.

CERTIFICATE HOLDER
The ACORD name and logo are registered marks of ACORD
HIRED

AUTOS ONLY
4/1/2024
InterWest Insurance Services, LLC
1550 Parkside Dr Ste 240
Walnut Creek CA 94596
Sara Swanson, CISR
707-794-7409
707-794-7409
[email protected]
License#: 0B01094
Hartford Fire Insurance Co
19682
GATEPAC-01
Trumbull Insurance Company
27120
Gateway Pacific Contractors, Inc.
8055 Freeport Blvd
Sacramento CA 95832
Hartford Casualty Ins Company
29424
Indian Harbor Insurance Co
36940
Insurance Co. of the West
27847
Travelers Property Casualty Company of America
25674
1339185644
A
X
2,000,000
X
300,000
5,000
2,000,000
4,000,000
X
Y
Y
57UEABA0ZG5
1/1/2024
1/1/2025
4,000,000
B
1,000,000
X
X
X
Y
Y
57UEACI8059
1/1/2024
1/1/2025
C
X
X
10,000,000
Y
57RHABA0ZGE
1/1/2024
Y
1/1/2025
10,000,000
X
10,000
E
X
Y
WSA507495900
1/1/2024
1/1/2025
1,000,000
1,000,000
1,000,000
D
D
F
Pollution Liability
Professional Liability
Builder's Risk
PEC002098017
PEC002098017
QT6305X559619TIL24
1/1/2024
1/1/2024
1/1/2024
1/1/2025
1/1/2025
1/1/2025
Per Claim/Aggr/SIR
Per Claim/Aggr/SIR
Builder's Risk
$5,000,000/$25,000
$5,000,000/$25,000
See Below
BUILDER'S RISK COVERAGE INFORMATION:

Completed Value Form - Contract Cost (see below); $5,000 Deductible Transit Coverage - Limit: $500,000; $5,000 Deductible
Temporary Locations - Limit: $500,000; $5,000 Deductible Coverage Perils: Risk of Direct Physical Loss Damage, as per policy provisions Replacement Cost
Additional Insured status applies to requested entities if required by written contract per the attached policy form/endorsement(s). Waiver of Subrogation See Attached...

City of Stockton
Its Officers, Officials, Employees and Volunteers
400 E Main Street, 3rd Floor – HR
Stockton CA 95202

ATTACHMENT A
305
Preview
ACORD 101 (2008/01)
The ACORD name and logo are registered marks of ACORD
© 2008 ACORD CORPORATION. All rights reserved.

THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, FORM NUMBER: FORM TITLE:

ADDITIONAL REMARKS
ADDITIONAL REMARKS SCHEDULE Page of
AGENCY CUSTOMER ID:

LOC #:

AGENCY

CARRIER NAIC CODE

POLICY NUMBER

NAMED INSURED
EFFECTIVE DATE:

GATEPAC-01
1 1
InterWest Insurance Services, LLC
Gateway Pacific Contractors, Inc.
8055 Freeport Blvd
Sacramento CA 95832
25 CERTIFICATE OF LIABILITY INSURANCE
applies to requested entities if required by written contract per the attached policy form/endorsement(s). Primary Non-Contributory Wording applies to requested entities if required by written contract per the attached policy form/endorsement(s). Excess/Umbrella follows form to primary policies.

Re: 11373 N. Lower Sacramento Road, Lodi, CA 95242.

The City of Stockton, its officers, officials, employees, and volunteers.

ATTACHMENT A
306
Preview

COMMERCIAL AUTOMOBILE
HA 99 16 12 21
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.

Form HA 99 16 12 21 Page 1 of 5
© 2021, The Hartford
(Includes copyrighted material of Insurance Services Office, Inc. with its permission.)

COMMERCIAL AUTOMOBILE BROAD FORM

ENDORSEMENT

This endorsement modifies insurance provided under the following:

BUSINESS AUTO COVERAGE FORM

To the extent that the provisions of this endorsement provide broader benefits to the "insured" than other provisions of the Coverage Form, the provisions of this endorsement apply.

1. BROAD FORM INSURED
Paragraph .1. - WHO IS AN INSURED - of
Section II - Liability Coverage is amended to
add the following:
d. Subsidiaries and Newly Acquired or
Formed Organizations
The Named Insured shown in the
Declarations is amended to include:
(1) Any legal business entity other than a
partnership or joint venture, formed as a
subsidiary in which you have an
ownership interest of more than 50% on
the effective date of the Coverage Form.

However, the Named Insured does not
include any subsidiary that is an
"insured" under any other automobile
policy or would be an "insured" under
such a policy but for its termination or
the exhaustion of its Limit of Insurance.
(2) Any organization that is acquired or
formed by you and over which you
maintain majority ownership. However,
the Named Insured does not include any
newly formed or acquired organization:
(a) That is a partnership or joint
venture,
(b) That is an "insured" under any other
policy,
(c) That has exhausted its Limit of
Insurance under any other policy, or
(d) 180 days or more after its
acquisition or formation by you,
unless you have given us notice of
the acquisition or formation.

Coverage does not apply to "bodily
injury" or "property damage" that results
from an "accident" that occurred before
you formed or acquired the organization.
e. Employees as Insureds
(1). Any "employee" of yours while using a
covered "auto" you don't own, hire or
borrow in your business or your
personal affairs.
f. Lessors as Insureds
(1). The lessor of a covered "auto" while the
"auto" is leased to you under a written
agreement if:
(a) The agreement requires you to
provide direct primary insurance for
the lessor and
(b) The "auto" is leased without a
driver.

Such a leased "auto" will be considered a
covered "auto" you own and not a covered
"auto" you hire.
g. Additional Insured if Required by Contract
(1) When you have agreed, in a written
contract or written agreement, that a
person or organization be added as an
additional insured on your business auto
policy, such person or organization is an
"insured", but only to the extent such
person or organization is liable for
"bodily injury" or "property damage"
caused by the conduct of an "insured"
under paragraphs a. or b. of Who Is An
Insured with regard to the ownership,
maintenance or use of a covered "auto."
The insurance afforded to any such
additional insured applies only if the
"bodily injury" or "property damage"
occurs:
(a) During the policy period, and
(b) Subsequent to the execution of such
written contract, and

ATTACHMENT A
307
Preview

Page 2 of 5 ends

(c) Prior to the expiration of the period
of time that the written contract
requires such insurance be provided
to the additional insured.
(2) How Limits Apply
If you have agreed in a written contract
or written agreement that another
person or organization be added as an
additional insured on your policy, the
most we will pay on behalf of such
additional insured is the lesser of:
(a) The limits of insurance specified in
the written contract or written
agreement; or
(b) The Limits of Insurance shown in
the Declarations.

Such amount shall be a part of and not
in addition to Limits of Insurance shown
in the Declarations and described in this
Section.
(3) Additional Insureds Other Insurance
If we cover a claim or "suit" under this
Coverage Part that may also be covered
by other insurance available to an
additional insured, such additional
insured must submit such claim or "suit"
to the other insurer for defense and
indemnity.

However, this provision does not apply
to the extent that you have agreed in a
written contract or written agreement
that this insurance is primary and non-
contributory with the additional insured's
own insurance.
(4) Duties in The Event Of Accident, Claim,
Suit or Loss
If you have agreed in a written contract
or written agreement that another
person or organization be added as an
additional insured on your policy, the
additional insured shall be required to
comply with the provisions in LOSS
CONDITIONS 2. - DUTIES IN THE

EVENT OF ACCIDENT, CLAIM , SUIT
OR LOSS – OF SECTION IV –
BUSINESS AUTO CONDITIONS, in the
same manner as the Named Insured.

2. Primary and Non-Contributory if
Required by Contract
Only with respect to insurance provided to
an additional insured in A.1.g. - Additional
Insured If Required by Contract, the
following provisions apply:
(1) Primary Insurance When Required By
Contract
This insurance is primary if you have
agreed in a written contract or written
agreement that this insurance be
primary. If other insurance is also
primary, we will share with all that other
insurance by the method described in
Other Insurance 5.d.
(2} Primary And Non-Contributory To Other
Insurance When Required By Contract
If you have agreed in a written contract
or written agreement that this insurance
is primary and non-contributory with the
additional insured's own insurance, this
insurance is primary and we will not
seek contribution from that other
insurance.

Paragraphs (1) and (2) do not apply to other
insurance to which the additional insured
has been added as an additional insured.

When this insurance is excess, we will have
no duty to defend the insured against any
"suit" if any other insurer has a duty to
defend the insured against that "suit". If no
other insurer defends, we will undertake to
do so, but we will be entitled to the insured's
rights against all those other insurers.

When this insurance is excess over other
insurance, we will pay only our share of the
amount of the loss, if any, that exceeds the
sum of:
(1) The total amount that all such other
insurance would pay for the loss in the
absence of this insurance; and
(2) The total of all deductible and self-
insured amounts under all that other
insurance.

We will share the remaining loss, if any, by
the method described in SECTION IV-
Business Auto Conditions, B. General
Conditions, Other Insurance 5.d.

3. AUTOS RENTED BY EMPLOYEES
Any "auto" hired or rented by your "employee"
on your behalf and at your direction will be
considered an "auto" you hire.

The SECTION IV- Business Auto Conditions, B.

General Conditions, 5. OTHER INSURANCE
Condition is amended by adding the following:
e. If an "employee’s" personal insurance also
applies on an excess basis to a covered
"auto" hired or rented by your "employee" on
your behalf and at your direction, this
insurance will be primary to the
"employee’s" personal insurance.

ATTACHMENT A
308
Preview

Form HA 99 16 12 21 Page 3 of 5

4. AMENDED FELLOW EMPLOYEE EXCLUSION
EXCLUSION 5. - FELLOW EMPLOYEE - of
SECTION II - LIABILITY COVERAGE does not
apply if you have workers' compensation
insurance in-force covering all of your
"employees".

Coverage is excess over any other collectible
insurance.

5. HIRED AUTO PHYSICAL DAMAGE COVERAGE
If hired "autos" are covered "autos" for Liability
Coverage and if Comprehensive, Specified
Causes of Loss, or Collision coverages are
provided under this Coverage Form for any
"auto" you own, then the Physical Damage
Coverages provided are extended to "autos" you
hire or borrow, subject to the following limit.

The most we will pay for "loss" to any hired
"auto" is:
(1) $100,000;
(2) The actual cash value of the damaged or
stolen property at the time of the "loss"; or
(3) The cost of repairing or replacing the
damaged or stolen property,
whichever is smallest, minus a deductible. The
deductible will be equal to the largest deductible
applicable to any owned "auto" for that
coverage. No deductible applies to "loss"
caused by fire or lightning. Hired Auto Physical
Damage coverage is excess over any other
collectible insurance. Subject to the above limit,
deductible and excess provisions, we will
provide coverage equal to the broadest
coverage applicable to any covered "auto" you
own.

We will also cover loss of use of the hired "auto"
if it results from an "accident", you are legally
liable and the lessor incurs an actual financial
loss, subject to a maximum of $1000 per
"accident".

This extension of coverage does not apply to
any "auto" you hire or borrow from any of your
"employees", partners (if you are a partnership),
members (if you are a limited liability company),
or members of their households.

6. PHYSICAL DAMAGE - ADDITIONAL

TEMPORARY TRANSPORTATION EXPENSE

COVERAGE
Paragraph A.4.a. of SECTION III - PHYSICAL
DAMAGE COVERAGE is amended to provide a
limit of $50 per day and a maximum limit of
$1,000.

7. LOAN/LEASE GAP COVERAGE
Under SECTION III - PHYSICAL DAMAGE
COVERAGE, in the event of a total "loss" to a
covered "auto", we will pay your additional legal
obligation for any difference between the actual
cash value of the "auto" at the time of the "loss"
and the "outstanding balance" of the loan/lease.
"Outstanding balance" means the amount you
owe on the loan/lease at the time of "loss" less
any amounts representing taxes; overdue
payments; penalties, interest or charges
resulting from overdue payments; additional
mileage charges; excess wear and tear charges;
lease termination fees; security deposits not
returned by the lessor; costs for extended
warranties, credit life Insurance, health, accident
or disability insurance purchased with the loan
or lease; and carry-over balances from previous
loans or leases.

8. AIRBAG COVERAGE
Under Paragraph B. EXCLUSIONS - of

SECTION III - PHYSICAL DAMAGE
COVERAGE, the following is added:

The exclusion relating to mechanical breakdown
does not apply to the accidental discharge of an
airbag.

9. ELECTRONIC EQUIPMENT - BROADENED

COVERAGE
a. The exceptions to Paragraphs B.4 -
EXCLUSIONS - of SECTION III - PHYSICAL
DAMAGE COVERAGE are replaced by the
following:

Exclusions 4.c. and 4.d. do not apply to
equipment designed to be operated solely by
use of the power from the "auto's" electrical
system that, at the time of "loss", is:
(1) Permanently installed in or upon the
covered "auto";
(2) Removable from a housing unit which is
permanently installed in or upon the
covered "auto";
(3) An integral part of the same unit housing
any electronic equipment described in
Paragraphs (1) and (2) above; or
(4) Necessary for the normal operation of the
covered "auto" or the monitoring of the
covered "auto's" operating system.
b. Section III, Physical Damage Coverage,
Limit of Insurance, Paragraph C.2. is
amended to add the following:
$1,500 is the most we will pay for "loss" in
any one "accident" to all electronic
equipment (other than equipment designed
solely for the reproduction of sound, and
accessories used with such equipment) that
reproduces, receives or transmits audio,
visual or data signals which, at the time of
"loss", is:

ATTACHMENT A
309
Preview

Page 4 of 5 ends

(1) Permanently installed in or upon the
covered "auto" in a housing, opening or
other location that is not normally used
by the "auto" manufacturer for the
installation of such equipment;
(2) Removable from a permanently installed
housing unit as described in Paragraph

2.a. above or is an integral part of that
equipment; or
(3) An integral part of such equipment.
c. For each covered "auto", should loss be
limited to electronic equipment only, our
obligation to pay for, repair, return or replace
damaged or stolen electronic equipment will
be reduced by the applicable deductible
shown in the Declarations, or $250,
whichever deductible is less.

10. EXTRA EXPENSE - BROADENED

COVERAGE
Under Paragraph A. - COVERAGE - of SECTION
III - PHYSICAL DAMAGE COVERAGE, we will
pay for the expense of returning a stolen covered
"auto" to you.

11. GLASS REPAIR - WAIVER OF DEDUCTIBLE
Under Paragraph D. - DEDUCTIBLE - of

SECTION III - PHYSICAL DAMAGE COVERAGE,
the following is added:

No deductible applies to glass damage if the
glass is repaired rather than replaced.

12. TWO OR MORE DEDUCTIBLES
Under Paragraph D. - DEDUCTIBLE - of

SECTION III - PHYSICAL DAMAGE COVERAGE,
the following is added:

If another Hartford Financial Services Group,
Inc. company policy or coverage form that is not
an automobile policy or coverage form applies to
the same "accident", the following applies:
(1) If the deductible under this Business Auto
Coverage Form is the smaller (or smallest)
deductible, it will be waived;
(2) If the deductible under this Business Auto
Coverage Form is not the smaller (or
smallest) deductible, it will be reduced by
the amount of the smaller (or smallest)
deductible.

13. AMENDED DUTIES IN THE EVENT OF

ACCIDENT, CLAIM, SUIT OR LOSS
The requirement in LOSS CONDITIONS 2.a. -

DUTIES IN THE EVENT OF ACCIDENT,
CLAIM, SUIT OR LOSS - of SECTION IV -
BUSINESS AUTO CONDITIONS that you must
notify us of an "accident" applies only when the
"accident" is known to:
(1) You, if you are an individual;
(2) A partner, if you are a partnership;
(3) A member, if you are a limited liability
company; or
(4) An executive officer or insurance manager, if
you are a corporation.

14. UNINTENTIONAL FAILURE TO DISCLOSE

HAZARDS
If you unintentionally fail to disclose any hazards
existing at the inception date of your policy, we
will not deny coverage under this Coverage
Form because of such failure.

15. HIRED AUTO - COVERAGE TERRITORY

SECTION IV, BUSINESS AUTO CONDITIONS,
PARAGRAPH B. GENERAL CONDITIONS, 7. -

POLICY PERIOD, COVERAGE TERRITORY -
is added to include the following:
(6) For short-term hired "autos", the coverage
territory with respect to Liability Coverage is
anywhere in the world provided that if the
"insured's" responsibility to pay damages for
"bodily injury" or "property damage" is
determined in a "suit," the "suit" is brought in
the United States of America, the territories
and possessions of the United States of
America, Puerto Rico or Canada or in a
settlement we agree to.

16. WAIVER OF SUBROGATION
Paragraph 5. TRANSFER OF RIGHTS OF
RECOVERY AGAINST OTHERS TO US - of

SECTION IV - BUSINESS AUTO CONDITIONS
A. Loss Conditions is amended by adding the
following:

We waive any right of recovery we may have
against any person or organization with whom
you have a written contract that requires such
waiver because of payments we make for
damages under this Coverage Form.

17. RESULTANT MENTAL ANGUISH COVERAGE
The definition of "bodily injury" in SECTION V-
DEFINITIONS, C. is replaced by the following:
"Bodily injury" means bodily injury, sickness or
disease sustained by any person, including
mental anguish or death resulting from any of
these.

18. EXTENDED CANCELLATION CONDITION
Paragraph 2. of the COMMON POLICY
CONDITIONS - CANCELLATION - applies
except as follows:

If we cancel for any reason other than
nonpayment of premium, we will mail or deliver
to the first Named Insured written notice of
cancellation at least 60 days before the effective
date of cancellation.

ATTACHMENT A
310
Preview

Form HA 99 16 12 21 Page 5 of 5

19. HYBRID, ELECTRIC, OR NATURAL GAS

VEHICLE PAYMENT COVERAGE
In the event of a total loss to a "non-hybrid" auto
for which Comprehensive, Specified Causes of
Loss, or Collision coverages are provided under
this Coverage Form, then such Physical
Damage Coverages are amended as follows:
a. If the auto is replaced with a "hybrid" auto or
an auto powered solely by electricity or
natural gas, we will pay an additional 10%,
to a maximum of $2,500, of the "non-hybrid"
auto’s actual cash value or replacement
cost, whichever is less,
b. The auto must be replaced and a copy of a
bill of sale or new lease agreement received
by us within 60 calendar days of the date of
"loss,"
c. Regardless of the number of autos deemed
a total loss, the most we will pay under this
Hybrid, Electric, or Natural Gas Vehicle
Payment Coverage provision for any one
"loss" is $10,000.

For the purposes of the coverage provision,
a. A "non-hybrid" auto is defined as an auto
that uses only an internal combustion engine
to move the auto but does not include autos
powered solely by electricity or natural gas.
b. A "hybrid" auto is defined as an auto with an
internal combustion engine and one or more
electric motors; and that uses the internal
combustion engine and one or more electric
motors to move the auto, or the internal
combustion engine to charge one or more
electric motors, which move the auto.

20. VEHICLE WRAP COVERAGE
In the event of a total loss to an "auto" for which
Comprehensive, Specified Causes of Loss, or
Collision coverages are provided under this
Coverage Form, then such Physical Damage
Coverages are amended to add the following:

In addition to the actual cash value of the "auto",
we will pay up to $1,000 for vinyl vehicle wraps
which are displayed on the covered "auto" at the
time of total loss. Regardless of the number of
autos deemed a total loss, the most we will pay
under this Vehicle Wrap Coverage provision for
any one "loss" is $5,000. For purposes of this
coverage provision, signs or other graphics
painted or magnetically affixed to the vehicle are
not considered vehicle wraps.

ATTACHMENT A
311
Preview

ATTACHMENT A
312
Preview
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.

ADDITIONAL INSURED - OWNERS, LESSEES OR

CONTRACTORS - OPTION I
This endorsement modifies insurance provided under the following:

COMMERCIAL GENERAL LIABILITY COVERAGE PART

SCHEDULE
Designated Project(s) Or Location(s)Name Of Additional Insured Person(s) Of Covered Operations:Or Organization(s):

Information required to complete this Schedule, if not shown above, will be shown in the Declarations.

A. (3)With respect to those person(s) or organization(s) In connection with "your work" for the shown in the Schedule above when you have additional insured at the project(s) or agreed in a written contract or written agreement location(s) designated in the Schedule to provide insurance such as is afforded under this and included within the "products- f. Any Otherpolicy to them, Subparagraph , completed operations hazard", but only if:

Party Additional Insureds When, under the (a) The written contract or written Required By Written Contract, Written agreement requires you to provide Agreement Or Permit Section II –Paragraph of such coverage to such additional Who Is An Insured is replaced with the following: insured at the project(s) or location(s) f. Any Other Party designated in the Schedule; and
(b)Any other person or organization who is not This Coverage Part provides a. e.an insured under Paragraphs through coverage for "bodily injury" or above, but only with respect to liability for "property damage" included within the "bodily injury", "property damage" or "personal "products-completed operations and advertising injury" caused, in whole or in hazard". part, by your acts or omissions or the acts or The insurance afforded to the additional omissions of those acting on your behalf: insured shown in the Schedule applies:
(1) In the performance of your ongoing (1) Only if the "bodily injury" or "property operations for such additional insured at damage" occurs, or the "personal and the project(s) or location(s) designated in advertising injury" offense is committed:
the Schedule; (a) During the policy period; and
(2) In connection with your premises owned (b) Subsequent to the execution of suchby or rented to you and shown in the written contract or written agreement;Schedule; or and

Page 1 of 2 ends

© 2013, The Hartford
(Includes copyrighted material of Insurance Services Office, Inc., with its permission.) All, except Additional Insureds that are
insured under a separate additional
insured endorsement on this policy.

POLICY NUMBER: 57UEABA0ZG5

ATTACHMENT A
313
Preview
(c
) When You Add Others As An AdditionalPrior to the expiration of the period of Insured To This Insurancetime that the written contract or written agreement requires such insurance (a) Primary Insurance When Required By be provided to the additional insured. Contract
(2) Only to the extent permitted by law; and This insurance is primary if you have agreed (3) Will not be broader than that which you in a written contract or written agreement that are required by the written contract or this insurance be primary. If other insurance written agreement to provide for such is also primary, we will share with all that additional insured. other insurance by the method described in (c)Paragraph below. This insurance does notWith respect to the insurance afforded to the apply to other insurance to which theperson(s) or organization(s) that are additional additional insured in the Schedule has been insureds under this endorsement, the added as an additional insured.following additional exclusion applies:
(b) Primary And Non-Contributory To OtherThis insurance does not apply to "bodily Insurance When Required By Contractinjury", "property damage" or "personal and advertising injury" arising out of the rendering This insurance is primary to and will not seek of, or the failure to render, any professional contribution from any other insurance architectural, engineering or surveying available to an additional insured under your services, including: policy provided that:
(1) (i)The preparing, approving, or failing to The additional insured in the Schedule is prepare or approve maps, shop drawings, a Named Insured under such other opinions, reports, surveys, field orders, insurance; and change orders, designs or specifications; (ii) You have agreed in a written contract or or written agreement that this insurance
(2) Supervisory, inspection, architectural or would be primary and would not seek engineering activities. contribution from any other insurance available to the additional insured in theThe limits of insurance that apply to the additional Schedule.insured shown in the Schedule are described in the (c) Method Of SharingLimits Of Insurance section.

How this insurance applies when other insurance is If all of the other insurance permits available to the additional insured is described in the contribution by equal shares, we will follow Section IV –Other Insurance Condition in this method also. Under this approach, each Commercial General Liability Conditions, except as insurer contributes equal amounts until it has otherwise amended below. paid its applicable limit of insurance or none of the loss remains, whichever comes first.B. With respect to insurance provided to the person(s) or organization(s) that are additional If any of the other insurance does not permit When You insureds under this endorsement, the contribution by equal shares, we will Add Others As An Additional Insured To This contribute by limits. Under this method, each Insurance Othersubparagraph, under the insurer's share is based on the ratio of its Insurance Section IV – Commercial Condition of applicable limit of insurance to the total General Liability Conditions is replaced with the applicable limits of insurance of all insurers. following: All other terms and conditions in the policy remain unchanged.

Page 2 of 2 ends

ATTACHMENT A
314
Preview

ATTACHMENT A
315
Preview

ATTACHMENT A
316
Preview

ATTACHMENT A
317
Preview

ATTACHMENT A
318
Preview

ATTACHMENT A
319
Preview

ATTACHMENT A
320
Preview

ATTACHMENT A
321
Preview

ATTACHMENT A
322
Preview

ATTACHMENT A
323
Preview

ATTACHMENT A
324
Preview

ATTACHMENT A
325
Preview

ATTACHMENT A
326
Preview

ATTACHMENT A
327
Preview

ATTACHMENT A
328
Preview

ATTACHMENT A
329
Preview

ATTACHMENT A
330
Preview

ATTACHMENT A
331
Preview

ATTACHMENT A
332
Preview

ATTACHMENT A
333
Preview

ATTACHMENT A
334
Preview

ATTACHMENT A
335

Jim Vicari
Managing Director
Bond & Specialty Insurance
Construction Services
(916) 852-5264
(866) 467-5504 (fax)
[email protected]

11090 White Rock Road, Suite 100
Rancho Cordova, CA 95670

March 19, 2024

City of Stockton, City Hall
425 North El Dorado Street
Stockton, CA 95202-1997
Attn: Eliza Garza, CMC, City Clerk

Re: Statement of Surety for: Gateway Pacific Contractors, Inc.

Project: Design Build Services for the Delta Water Treatment Plant Groundwater Recharge Basin (PUR 24-016)

Dear Ms. Garza:

Please accept this letter to comply with your request for a bondability letter for Gateway Pacific Contractors, Inc. (GPCI).

Travelers Casualty and Surety Company of America (hereinafter referred to as Travel ers) has handled all of the bonding requirements for GPCI since 1999. During our involvement, we have approved individual projects for GPC I in excess of $5 0,000,000 with aggregate backlog s up to $75,000,000. These amounts are currently available , but please note that th is does not represent our m aximum commitment to this excellent contractor. The bonding capacity of GPCI is sufficient for this project which we understand is in the $6,000,000 to $7,000,000 range.

Should GPCI request Travelers to provide the required performance and payment bonds for one of your projects, we stand ready to do so subject to our standard underwriting procedures including, but not limited to, favorable review of the contract documents , bond forms and financial condition at the time of the request. It should be understood that all bond requests are a matter between GPCI and Travelers. We therefore assume n o liability to any other party if for any reason we do not execute said bonds.

Travelers is licensed to do business in all States. Tra velers is listed in the Department of Treasury’s Listing of App roved Sureties (Department Circular 570) with an underwri ting limitation of $224,944,000 (eff. 07/01/2023) and holds an A++ (Superior) rating from A.M. Best with a Financial Size Category of XV. If you should have any questions regarding GPCI or their ability to bond a future project of yours, please feel free to contact me direct at 916-852-5264.

Sincerely,

James P. Vicari
Managing Director / Attorney-In Fact

ATTACHMENT A
336
Travelers Casualty and Surety Company of America
Travelers Casualty and Surety Company
St. Paul Fire and Marine Insurance Company
State of Connecticut
By: _______________________________________________
Robert L. Raney, Senior Vice President City of Hartford ss.

On this the 21st day of April, 2021, before me personally appeared Robert L. Raney , who acknowledged himself to be the Senior VicePresident of each of the Companies , and  that he, as such, being authorized so to do, executed the foregoing instrument for the purposestherein contained by signing on behalf of saidCompaniesby himself as a duly authorized officer.

INWITNESSWHEREOF, I hereunto set my hand and official seal. My Commission expires the 30th day of June, 2026 ______________________________________________ AnnaP.Nowik, Notary Public

This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of  each of theCompanies,which resolutions are now infull force and effect, reading as follows:

I, Kevin E. Hughes , the undersigned, Assistant Secretary of each of the Companies, do hereby certify that the above and foregoing is a trueandcorrect copy of the  Power of Attorney executed by said Companies, whichremains in full force and effect.

Dated this day of , .
________________________________________
Kevin E. Hughes, Assistant Secretary
To verify the authenticity of this Power of Attorney, please call us at 1-800-421-3880.

Please refer to the above-named Attorney(s)-in-Fact and the details of the bond to which this PowerofAttorney is attached.

RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President,anySecond Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys-in-Fact andAgentstoactforandonbehalfoftheCompanyandmaygivesuchappointeesuchauthorityashisorhercertificateofauthority mayprescribeto sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in thenature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any suchappointeeandrevokethepowergivenhimorher;anditis FURTHER RESOLVED,  that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or anyVicePresident may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided thateach suchdelegationisinwritingandacopythereofisfiledintheofficeoftheSecretary;anditis FURTHER RESOLVED,  that any bond, recognizance, contract of indemnity, or w riting obligatory in the nature of a bond, recognizance, orconditionalundertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the CorporateSecretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary; or (b) duly executed (under seal, if required) by one or more Attorneys-in-Fact and Agents pursuant to the power prescribed in his or her certificate or theircertificatesofauthorityorbyoneormoreCompanyofficerspursuanttoawrittendelegationofauthority;anditis FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, anyVicePresident,anyAssistantVicePresident,anySecretary,anyAssistantSecretary,andthesealoftheCompanymaybeaffixedbyfacsimileto anyPower of Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys-in- Fact for purposesonlyof executingand attestingbonds and undertakings and other writings obligatory in the naturet hereof, andany such Powerof AttorneyorcertificatebearingsuchfacsimilesignatureorfacsimilesealshallbevalidandbindingupontheCompanyandanysuchpowersoexecuted andcertifiedby such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding towhichitisattached.

POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS : That  Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company are corporations  duly organized under the laws of the  State of Connecticut (herein collectivelycalled the"Companies"), and that the Companies do hereby make, constitute and appointof , , their true and lawful Attorney (s)-in-Fact to sign, execute, seal and acknowledge any and all bonds,  recognizances, conditionalundertakings and  other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the  performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law.

INWITNESSWHEREOF ,theCompanieshavecausedthisinstrumenttobesigned,andtheircorporatesealstobeheretoaffixed,this 21stdayofApril, 2021.
19th March 2024
JamesPVicari
RanchoCordova California

ATTACHMENT A
337
March 19, 2024

ATTACHMENT A
338

Date: April 3, 2024

To: City of Stockton
C/O: Eliza Garza, CMC, City Clerk
425 North El Dorado Street
Stockton, CA 95202

RE: Gateway Pacific Contractors, Inc.

Delta WWTP Groundwater Recharge Basin (PUR 24-016)

I wanted to let you know that our Bank has worked with Gateway Pacific Contractors, Inc. since 2010 and we hold the company management in the highest of regards.

We currently hold available for the company a revolving line of credit in the low seven figure range, and it has a $0 balance. Its annual expiry date is 7/1/ 24. We also hold deposit accounts with average total balances in the mid seven figure range. Gateway Pacific Contractors, Inc. has handled all banking arrangements in an exemplary manner and is considered to be one of our most highly valued clients.

Should you have any questions regarding this letter or need further information, please do not hesitate to contact me at any time.

Best regards,

Brian Dobbs
Senior Vice President
Umpqua Bank – Community Commercial Banking

Office: (916) 677-5873
[email protected]

ATTACHMENT A
339

Appendix C
Detailed Scope of Work

ATTACHMENT A
340

1 APPENDIX C

DETAILED SCOPE OF WORK

DESIGN BUILD SERVICES FOR THE DELTA WATER

TREATMENT PLANT GROUNDWATER RECHARGE BASIN

Project Overview
The goal of the Recharge Basins Project is to design and construct groundwater recharge basins and associated infrastructure. The construction of groundwater recharge basins will improve water supply reliability and raise groundwater levels in the Eastern San Joaquin Subbasin. The recharge basins shall also be designed and constructed to provide benefits including habitat for birds, providing water, shelter, and/or breeding places during their migration along the Pacific Flyway.

The Recharge Basins shall be designed and constructed to achieve at least the infiltration rates range from approximately 15,000 AF to 30,000 AF/year (1 -2 AF/day) assuming the basins are used 335 days/year. The design should consider operational needs and flexibility and the required maintenance of the basins.

A comprehensive geotechnical investigation was performed by Geosyntech in 2022 -2023 to determine the feasibility of groundwater recharge at the site. Electrical resistivity testing, soil borings, CPT, soil characterization/sampling, groundwater water quality sampling, and modeling were performed as part of the investigation. Groundwater wells were installed, and a utility survey was also completed as part of the project. We have reviewed this work and believe this supports the desired percolation.

The City also expects the Design -Build Team to complete California Environmental Quality Act (CEQA) documentation for construction of additional treatment capacity for the Delta Water Treatment Plant (DWTP) in addition to Recharge Project construction. This is needed to pursue additional Delta diversions for groundwater recharge and to meet future potable water demand.

The Design Build Team shall provide engineering services including validation of pre-design conclusions contained in the Feasibility Study and preparation of sufficient plans, specifications,

ATTACHMENT A
341

2 and other supporting documents to construct the Recharge Basins. Services are to include, but are not limited to: final design, permitting, equipment and materials procurement, physical construction of the Recharge Basins, engineering design support during construction, construction management, record drawings, start-up, and acceptance testing.

Work Products
Design-Build services and work products shall include:
• Project management for the duration of project.
• Topographic survey.
• Review of pre-design and recommending any changes that could benefit the project. • Project specific CEQA analysis for the Recharge Basins Project. • Project specific CEQA for DWTP expansion.
• Preparation of Piping and Instrumentation Diagrams (P&IDs), Recharge Basins plans, specifications, and other supporting documents.
• Visitor area signage design including grant funding details, groundwater recharge goals, graphic display of recharge, migrant bird information, etc. • Advising the City and facilitating City participation in all material decision making about the Recharge Basins as such decision making may affect the project scope and timeline, including City participation in select meetings and communications. • Preparation of the Supervisory Controls and Data Acquisition (SCADA) system design for the Recharge Basins and integration with the City’s WTP SCADA system. • Consideration of, and mitigation for, local community impacts of Recharge Basins operation that result in environmental nuisances (e.g. noise, odors, traffic), landscaping and lighting systems.
• Preparation of all necessary permit applications and facilitation of regulatory agency approval of all permits that are Design -Builder’s responsibility (City will sign permit applications, furnish permit application fees, and attend permitting coordination and review meetings with regulatory agencies as necessary). • Preparation of unified sets of plans and specifications. • 100% design
• Cost control and change order documentation.
• Design services during construction

ATTACHMENT A
342

3 • Development of a startup, commissioning and testing plans that will demonstrate facility compliance with design parameters. These plans shall consist of:
• O&M Manuals available prior to startup
• Written Standard Operating Procedures (SOPs)
• Training agenda or checklist
• Operator engagement and training
• Equipment data sheets to be included in the City’s computerized maintenance management system. We will furnish equipment data sheet to be included in the City’s computerized maintenance management system.

In summary construction services and work products will include:
• Construction management
• Surveying
• Utility location
• Clearing and grubbing
• Staging area
• Compliance with stormwater permit requirements
• Excavation, grading, and sitework
• Soil stockpiling
• Structural work
• Fence installation
• Piping and pumps
• Electrical, process mechanical, and instrumentation
• Landscaping
• Visitor area construction
• Informational groundwater recharge signage at visitors’ area • Startup and testing
Our scope of work is below. For clarity we have used same task number convention in the City’s RFP.

ATTACHMENT A
343

4 Task 3.1- Planning and Design

3.1.1 Project Management
Project management shall include preparing and submitting a project management approach to the City, coordinating all work of the team members, providing quality assurance/quality control (QA/QC), advance-scheduling of the work and then adhering to the project schedule, providing routine communications, cost controls, invoices, and progress reports, and conducting weekly or biweekly progress review meetings with the City.

Progress review meetings : Schedule and conduct weekly or bi -weekly progress review meetings with City and City’s representatives at MUD offices or via MS Teams. Meeting frequency will be determined on the work status and level of activity. Generate and distribute draft meeting minutes within one business day of each meeting for review by attendees, and final minutes that incorporate review comments. Distribute meeting agendas at least one business day prior to each meeting date. Other documents requi ring City review prior to the meeting shall be submitted at least two business days in advance. The City also requires the Design Build Team to present PowerPoint updates at the City’s Water Advisory Group, Council Water Committee, and City Council meetings twice each.

Schedule updates: Update the schedule, comparing actual progress to the originally proposed schedule, performing critical path analysis, and identifying any necessary corrective measures.

Monthly payment requests and progress reports: Prepare monthly invoices in accordance with actual progress and drawdown schedule and a monthly progress report to accompany each invoice for the previous month’s work. Progress reports shall review major work activities and budget and schedule status by task, summarizing work hours by task and job title and person assigned for the invoice period, and document progress made during the past month, accomplishments, and a look-ahead to the next month’s progress goals.

QA/QC program: Institute and maintain QA/QC program for the project.

Coordination: Coordinate with permitting agencies and other consultants as necessary. The Design-Build Team shall provide meetings minutes to City within five business days of each meeting other consultants.

ATTACHMENT A
344

5 3.1.2 Startup, Commissioning and Acceptance Testing Plan The Recharge Basins must pass two Acceptance Tests as part of and as a condition of Substantial and Final Completion. The Design Build Team shall prepare this Plan and submit it to the City for approval. The Design Build Team shall conduct the Acceptance Tests certifying to the City that the Contractor is ready for the test, and the Contractor is in compliance with the applicable terms of the Contract. All training shall be completed before start of the Acceptance Test.

3.1.3 Field Investigations
Topographic surveying: Provide topographic surveying services as necessary for design of the Recharge Basins.

The horizontal and vertical coordinate system and datums will be based on the North American Datum of 1983 (NAD83) converted to the California Grid Coordinate System of 1983, Zone 3 (CA83111-F) as referenced by the City of Stockton Horizontal Control System. The vertical datum will be based on the National Vertical Datum of 1929 (NGVD29) as referenced by available City of Stockton 1996 Local Adjustment (COS96) benchmarks.

Subsurface investigation: Conduct research to identify existing utilities, verify as-built locations, and determine utility locations throughout the project site as needed.

We shall conduct potholing if necessary to locate buried infrastructure, and drill borings to characterize subsurface conditions, to supplement the background documents as necessary for the design. We shall also evaluate pertinent engineering properties of the subsurface materials from the geotechnical study.

Raney Geotechnical will evaluate the site, soil, and groundwater conditions across the site and provide geotechnical engineering conclusions and recommendations for the design and construction of the proposed improvements. Raney will also perform supplemen tal geotechnical exploration and laboratory testing, as needed, during the design phase of the project to assist the design team in preparing project documents.

As part of 30% Design Submittal, Raney would include one day of geotechnical drilling with a truck mounted drill rig to depths of about 20 feet below the existing ground surface. We will also

ATTACHMENT A
345

6 perform laboratory testing to evaluate the engineering properties of the existing soils. The field and laboratory work will be evaluated to determine the suitability of the existing levees and shrinkage of the near -surface soils. The results of the field exploration, laboratory testing, and analysis will be provided in a technical memorandum with recommended geotechnical design criteria. Prior to drilling, we would obtain permits from the San Joaquin County Environmental Health Department and mark the exploration locations and notify the Underground Service Alert (USA) to obtain utility clearance.

Corrosion protection analysis : Provide Cathodic Protection for pipelines and equipment as required.

3.1.4 Permitting Services
Our team, led by Hleix Environmental Planning, shall coordinate with the appropriate regulatory agencies, resolve permitting issues, and prepare a schedule and action plan for obtaining all permits that are required to construct and operate the Recharge Basins.

A detailed scope of the recommended services to satisfy California Environmental Quality Act (CEQA) requirements is provided below.

Task 3.1.4.1 – Air Quality/Greenhouse Gas Emissions Analysis HELIX will prepare an air quality (AQ) and greenhouse gas (GHG) emissions analysis technical letter report addressing the issues described in the CEQA Guidelines Appendix G.

HELIX will coordinate with Client to obtain the data relative to Project phasing, construction methods and timing, export and import of soils and materials, anticipated energy use, and other data relative to AQ and GHG emissions. HELIX will calculate pollutant and GHG emissions associated with the construction and operation of the Project using the California Emissions Estimator Model (CalEEMod).

AQ and GHG impacts will be analyzed in accordance with the San Joaquin Valley Air Pollution Control District (SJVAPCD) Guidance for Assessing and Mitigating Air Quality Impacts and the SJVAPCD’s CEQA Air Quality Significance Thresholds. The air quality analysis will include qualitative discussions of the Project’s construction and operational potential toxic air pollutants and odor impacts. Because the Project is not anticipated to generate substantial new operational vehicle trips, local concentrations of carbon monoxide

ATTACHMENT A
346

7 (CO hotspots) resulting from the addition of Project traffic to the areas road will be discussed qualitatively. The analysis will include a discussion of any Project potential conflicts with the SJVAPCD’s air quality plans, including the 2022 Plan for the 2015 8 -Hour Ozone Standard Air Quality Management Plan and the 2018 Plan for the 1997, 2006, and 2012 PM2.5 Standards Western Riverside Council of Governments’ Subregional Climate Action Plan.

HELIX will also analyze any potential Project inconsistencies w ith applicable state and regional GHG reduction plans including the California Air Resource Board’s (CARB’s) 2022 Scoping Plan for Achieving Carbon Neutrality and the San Joaquin Council of Governments’ (SJCOG’s) 2022 Regional Transportation Plan and Sustainable Communities Strategy. If new potential significant air quality or GHG impacts are identified, HELIX will recommend appropriate mitigation measures.

HELIX will provide the results of the AQ and GHG analyses in a technical letter report. The report will include descriptions of the existing AQ and GHG environmental setting; a summary of applicable regulations and policies; a summary of the impact conclusions identified in the Stockton Delta Water Supply Project Program Environmental Impact Report (EIR); and the results of the analyses described above, including a determination of the level of significance of impacts in accordance with CEQA Guidelines. HELIX will revise the technical letter report based on comments from the Client and/or City. Revisions to the modeling or report resulting from changes to the Project description or Project construction assumptions would require a contract augment.

Deliverables: Draft and Final Air Quality and GHG technical letter report (electronic format) Task 3.1.4.2 – Biological Resources Assessment
HELIX will prepare a Biological Resources Assessment for the 125 -acre City of Stockton Delta Water Treatment Plant located in the City of Lodi, California. HELIX biologists will review available materials regarding existing site conditions, biological reso urces, and wetlands (e.g., U.S. Geological Survey [USGS] topographic maps, Natural Resources Conservation Service [NRCS] soils maps, and California Natural Diversity Database) for the Project site prior to conducting a field assessment. The biological stud y area to be utilized during the site assessment will consist of the Project site and a surrounding 250-foot buffer, where accessible. HELIX will conduct a field survey to identify dominant plant communities on the site, identify sensitive vegetation communities (including potential aquatic resources),

ATTACHMENT A
347

8 and evaluate the potential for the site to support special-status plant and wildlife species.

Upon completion of the field survey, a Biological Resources Assessment will be prepared that identifies biological resources and potential biological constraints, such as sensitive habitats, assesses the likelihood of special -status species or habitats to be found on the Project site, and provides recommendations for any further studies or permitting that may be required prior to the development of the site. An assessment of the extent of aquatic resources within the Study Area will also be conducted as par t of the field assessment although a formal aquatic resources delineation will not be performed. The report will also assess the potential for the site to support covered species under the San Joaquin Multi - species Conservation Plan (SJMSCP). The report wi ll include a soils map and a map of biological communities consistent with SJMSCP classifications. Results of the assessments will be included in the Biological Resources Assessment. HELIX can prepare an augment for appropriate surveys for potentially occu rring special-status species based on the findings contained in the Biological Resources Assessment.

An initial draft Biological Resources Assessment will be transmitted to Client for review and will then be finalized upon receipt of approval or incorporation of Client comments.

Deliverables: Draft and Final Biological Resources Assessment (electronic format) Task 3.1.4.3 – Cultural Resources Assessment
HELIX will prepare a Cultural Resources Assessment (CRA) for the 125-acre City of Stockton Delta Water Treatment Plant located in the City of Lodi, California.

Records Search, Background Research, and Native American Outreach: HELIX will conduct an archaeological and historical records review and literature search through the Central California Information Center (CCIC) of the California Historical Resources Information System, California State University, Stanislaus. The recor ds search area will include the Project site and a 0.25 -mile radius. The purpose of the records search is to: (1) identify cultural resources previously documented within and immediately adj acent to the project site; (2) to determine if the project site has been previously surveyed, when those surveys took place, and how the surveys were conducted; and (3) to ascertain the potential for cultural resources to be found in the project site. The records search will include reviews

ATTACHMENT A
348

9 of the appropriate USGS topographic maps where cultural resources are mapped, archaeological site and historic structure records, and data from previous surveys and research reports. In addition, the state of California Historical Landmarks, and the California Points of Historical Interest will be examined to ascertain the presence of designated, evaluated, and/or historic-era resources in the vicinity of the APE.

HELIX will also contact the Native American Heritage Commission (NAHC) to conduct a records search of their Sacred Lands File (SLF) for the presence of Native American sacred sites or human remains in the vicinity of the project area. Individual outreach t o Native American organizations and/or individuals will not be conducted.

Cultural Resources Survey: HELIX will conduct a survey of the project site to identify the presence of prehistoric and/or historic resources that might be impacted by project activities.

The fieldwork will consist of an intensive visual inspection of the project site ground surface by HELIX staff on foot using transects spaced 5- to 10- meters apart.

HELIX’s archaeologist will inspect all accessible portions of the project site. During the survey, the ground surface will be examined for the presence of prehistoric artifacts (e.g., flaked stone tools, tool-making debris, stone milling tools), historic artifacts (e.g., metal, glass, ceramics), sediment discoloration that might indicate the presence of midden, and depressions and other features that might indicate the former presence of structures or buildings (e.g., postholes, foundations). If resources are encountered during the survey, they will be photographed, and their position(s) will be recorded with GPS equipment. No artifacts will be collected during HELIX’s survey.

Cultural Resources Technical Report: The results of the records search, background research, NAHC coordination, and cultural resources survey will be presented in a CRA technical report. This report will include a description of the methods and results of the records search, background research, and field survey undertaken for the project. The report will conclude with recommendations for further study, evaluation, or mitigation of any cultural or historic resources that may be affected by the proposed project.

HELIX will respond to one round of comments from the County on the CRA technical report.

The comments are anticipated to be minor in nature and not require additional survey work or changes to the project’s APE.

ATTACHMENT A
349

10 Deliverables: Draft and Final CRA Technical Report (electronic format) Task 3.1.4.4 – Noise Analysis and Vibration
HELIX will prepare a noise and vibration analysis technical letter report. HELIX will conduct a site visit to evaluate the existing noise environment on and around the Project site. The site visit will include up to three short -term (10- to 15-minute) noise measurements. HELIX will analyze the Project’s noise and vibration impact, addressing the issues described in the State CEQA Guidelines Appendix G. Because the Project site is located outside the City limits, Project noise will be analyzed in accordance with the significance criteria established in both the City’s and San Joaquin County’s code of ordinance and general plan, and/or significance criteria recommended by other public agencies. Based on estimates of construction equipment for the AQ/GHG Emissions analysis, HELIX will model off-road equipment noise levels received at nearby noise sensitive land uses (e.g., residences) using the Federal Highway Administration’s (FHWA’s) Roadway Construction Noise Model (RCNM) and provide noise modeling results for up to three noise sensitive land use locations around the Project site. HELIX will estimate changes in Project operational noise for the DWTP based on new stationary equipment assumptions and new or increased off -road maintenance equipment assumptions pr ovided by the Client. HELIX will estimate changes Project operational noise levels received at nearby noise sensitive land uses using appropriate calculation methodology or exterior noise computer aided modeling.

HELIX will provide the results of the noise and vibration analyses in a technical letter report.

The report will include descriptions of the existing noise environmental setting; a summary of applicable regulations and policies; a summary of the impact con clusions identified in the Stockton Delta Water Supply Project Program EIR; and the results of the analyses described above, including a determination of the level of significance of impacts in accordance with CEQA Guidelines. HELIX will revise the technical letter report once based on comments from the Client and/or City. Revisions to the modeling or report resulting from changes to the Project description or Project construction assumptions would require a contract augment.

Deliverables: Draft and Final Noise and Vibration technical letter report (electronic format)

ATTACHMENT A
350

11 Task 3.1.4.5 – CEQA Initial Study/Mitigated Negative Declaration Based on review of the Project description and Feasibility Study Report, it is assumed a CEQA Initial Study/Mitigated Negative Declaration (IS/MND) is the appropriate CEQA compliance document for the proposed Project. The IS/MND will follow the format in Appendix G of the State CEQA Guidelines. HELIX will develop a CEQA IS/MND that will tier from the Stockton Delta Water Supply Project Program EIR that was certified in 2005. The IS/MND will consist of Project description text and graphics, a summary of the Project’s environmental effects in the context of the certified EIR, as well as the supporting environmental checklist in Appendix G. HELIX will incorporate the findings of the technical studies into the IS/MND. All other environmental issue areas will be presented and analyzed qualitatively. The IS/MND will contain all mandatory elements including the following:
• Project Description. The Project description will describe the baseline information for the project site, as well as the major elements (expansion of capacity for the DWTP and construction of three groundwater recharge basins) of the Project, and will include a discussion of the proposed construction and operation of the Project; • Figures. Figures identifying the local and regional location of the Project site and other Project characteristics as relevant to the CEQA analysis; and
• Disclosure of potential environmental impacts resulting from implementation of the proposed Project. The IS/MND will contain a narrative for each resource issue in support of each conclusion and it will include, but may not be limited to, discussions relevant to aesthetics, agricultural and forestry resources, air quality, biological resources, cultural resources, energy, geology and soils, greenhouse gas emissions, hazards and hazardous materials, hydrology and water quality, land use, mineral resources, n oise, population and housing, public services, recreation, transportation, tribal cultural resources, utilities/service systems, wildfire, and mandatory findings of significance.

HELIX will produce an electronic version of the Administrative Draft IS/MND for City review.

Upon receipt of a single consolidated set of written comments, HELIX will revise the Administrative Draft IS/MND as necessary to address comments and will provide an electronic copy of the Public Review Draft IS/MND.

HELIX will provide the City with an electronic copy of the required Notice of Intent to Adopt a Mitigated Negative Declaration (NOI), Notice of Completion (NOC), and Summary Form for

ATTACHMENT A
351

12 review by the City. Following City approval of the Public Review Draft IS/MND and draft notices, HELIX will upload the Public Review Draft IS/MND, NOI, NOC, and Summary Form to the State Clearinghouse on behalf of the City. It is assumed that the City will circulate the NOI in accordance with Section 15072(b) of the CEQA Guidelines and file the NOI with the San Joaquin County Clerk. This scope of work does not include the production of hardcopies of the Public Review Draft IS/MND.

Following the close of the 30-day public comment period, HELIX will consult with the City and review written comments received on the Public Review Draft IS/MND. HELIX will prepare draft responses to comments received on the environmental document for City review. It is assumed that no more than ten public comment letters would be received, comments will be minor (not requiring additional analysis or studies), and responses will consist primarily of clarifying information and directing commenters to the appropriate discussion in the IS/MND.

Once the City has reviewed and approved the responses to comments, the comments and responses will be integrated by HELIX into a Final IS/MND.

HELIX’s Project Manager will plan to attend up to two (2) public hearings in-person to respond to questions on the analysis presented in the IS/MND as needed. HELIX will prepare the Notice of Determination (NOD) for filing. HELIX will file the NOD with the County Clerk and State Clearinghouse within five (5) working days following adoption of the Final IS/MND. It is assumed the City will pay associated CDFW filing fees.

Deliverables:
• Administrative Draft, Public Review Draft, and Final IS/MND (electronic format) • Draft and Final NOI, NOC, and Summary Form (electronic format) • Draft and Final NOD (electronic format)

3.1.5 Design Packages
Nexgen will lead the design effort. Subconsultants for the design tasks include ControlPoint for electrical and controls design, Helix Environmental Planning for the visitors parking and landscaping plan, and Raney Geotechnical for supplemental geotechnical work in support of the design.

3.3.5.1 – Validation of Feasibility and Pre-Design Studies

ATTACHMENT A
352

13 One project kickoff meeting and then one validation workshop is anticipated to review the team’s findings and achieve consensus with the City with regard to the evaluation of the Feasibility Study/Pre -Design. Any recommendations for incorporation changes into the design to be submitted no later than 30 days after the NTP. This should include any value engineering recommendations.

Deliverables: Workshop agendas and materials and meeting minutes (2 workshops). Draft and final technical memo on scope clarifications or design changes.

3.1.5.2 – 30, 60, 90, and 100% Design Submittals
We shall prepare design packages to facilitate permitting and construction of the Recharge Basins. City shall review the design packages and construction/procurement submittals to confirm such conformance within 14 days after receipt.

We shall prepare drawings generally in accordance with City standards and using the latest edition of AutoCAD after submitting templates that demonstrate compliance with the City standards. Design packages will contain plans, sections, elevations, and applicable details including:
• Drawing index
• Design Criteria
• Standard details for each discipline
• Civil site layouts and grading, paving, and outside piping plans and sections • Pipeline plans and profiles
• Landscape, irrigation, and exterior lighting plans (see below) • Structural and architectural plans, sections and elevations • Process schematics and mechanical plans and sections
• Single-line diagrams
• SCADA system architecture, P&IDs and block diagrams
• Reference drawings
Deliverables: 30% Design Submittal, 30% Design workshop, 30% Design meeting summary and planned changes to design; 60% Design Submittal, 60% Design workshop, 60% Design meeting summary and planned changes to design; 90% Design Submittal, 90% Design

ATTACHMENT A
353

14 workshop, 90% Design meeting summary and planned changes to design, 100% Design submittal.

3.1.5.3 – Visitors Area & Landscape Plan (included within 30% Design Package) HELIX will develop a color rendered Preliminary Landscape Plan illustrating the concept for site development including the proposed visitor’s area, parking lot, recharge basin viewing areas with shade structure, educational signage, tree locations, plant p alette, pedestrian hardscape areas and other landscape improvements. The parking layout will be provided by the civil engineer and include approximately 15 standard and accessible stalls with additional space for a 10-person passenger van. The plan will be developed using base plan data from the City and/or civil engineer and conform with the City’s landscape and development standards.

The goals for the landscape design include providing shaded spaces for visitors to learn about the facility and its operations along with supporting educational signage and native and/or low water -use plantings. Landscape improvements will be limited to t hose immediately adjacent to the parking area and edge of basin – no landscaping will be provided along Lower Sacramento Road or the Project entry drive. This plan will be suitable for City review and comment prior to the start of construction documents. H ELIX, City staff, and the consultant team will attend a virtual meeting to discuss the design, elicit feedback, and answer any questions. We will make one round of consolidated revisions based on the comments received.

HELIX will attend one (1) in -person meeting and up to four (4) virtual meetings with Client, consultant team and/or City staff to review comments, discuss the design, coordinate, and/or respond to any questions or concerns.

Deliverables: Color rendered Preliminary Landscape Plan in electronic format (.pdf)

3.1.5.4 – Landscape Construction Documents (included in 90 and 10 0 % Design Package)
HELIX’s Landscape Architecture Group will prepare the necessary plans and specifications for the proposed landscape improvements based on the approved preliminary design. The 100% construction documents will consist of a landscape layout plan, irrigation p lan with

ATTACHMENT A
354

15 MWELO (California Model Efficient Landscape Ordinance) documentation, planting plan (with shade tree calculations), and construction details. Specifications will be prepared using the Construction Specifications Institute (CSI) format and/or reference to City standard specifications (as applicable). The 100% construction documents will be provided to Nexgen for inclusion within the overall plan set to the City.

We anticipate no more than two rounds of consolidated revisions based on the received comments. HELIX will conduct a conference call with City staff to review the plans and discuss any additional questions or concerns. A memorandum will be prepared summarizing any revisions or changes. Following approval of the 100% construction documents, a signed copy of the Final Construction Documents will be provided to the Client and City for their records.

Also included as part of this task, HELIX will develop up to four (4) draft designs for the educational signage to be located within the visitor area. This includes preparing the graphics, obtaining photos, and securing permission for copyrighted photos, developing text/verbiage, and performing any necessary research. We will submit the draft signs for client and City review and make one round of consolidated revisions based on the comments received.

HELIX will incorporate final edits to produce camera -ready artwork for production and coordination with the signage fabricator. The sign fabricator will invoice the general contractor directly.

During the Construction Documents task, HELIX will attend one (1) in -person meeting and up to six (6) virtual meetings with Client, consultant team and/or City staff to review comments, discuss the design, coordinate, and/or respond to any questions or concerns.

Task 3.2- Construction and Related Startup Services
The following work is included in the construction and startup/ acceptance testing of the groundwater Recharge Basins. We will construct facilities described in the 2023 Feasibility Study with the details provided in the Technical Services Section of the Proposal. Those details are listed below for clarity. Our cost estimate has been prepared consistent with these assumptions.
• Pipe size and alignments as shown on included figures

ATTACHMENT A
355

16 • Buried transmission pipes shall be cement mortar lined and coated steel pipe per AWWA C205. Exposed pipe shall be epoxy lined and coated. • Connection to the 54 inch supply pipe with one isolation valve and magnetic flowmeter above grade on a concrete slab as shown on the drawing. • Forebay design (baffle and overflow weir) as show on the attached figures • The parking layout will include 15 standard and accessible stalls with additional space for a 10-person passenger van. Shaded spaces for visitors to learn about the facility and its operations along with supporting educational signage and native and/or low water -use plantings. Landscape improvements will be limited to those immediately adjacent to the parking area and edge of basin • Flow and water level into each basin will be controlled by a 30 inch butterfly valve at each perc basin. A water level transducer and stilling well at each basin will provide input for the valves to open or close.
• The forebays will be armored with rip-rap at 2:1 slopes. The interior levees of the percolation basins will be filled at 3:1 slopes to encourage emerging vegetation along the perimeters.

Other work necessary for a complete project includes:
• Procurement of equipment and materials separately from construction phase as necessary to achieve project delivery schedule.
• Integration with the City’s SCADA system.
• Site safety and security during construction including coordination of site visits. • Completion of start-up and all required acceptance tests, SOP development, training, and including provision of chemicals during start-up.
• Preparation of an operations and maintenance (O&M) manual, as-built drawings and other project documentation in searchable Adobe Acrobat format; as-built drawings also provided on Mylar sheets and AutoCAD files.
• Training of the City staff.
• We will install five nested groundwater monitoring wells similar to Monitoring Well MW-1 already installed at the site. The wells will extend about 200 feet below the existing ground surface and will be installed in accordance with San Joaquin County Environmental Health Department requirements. Each well will be monitored with a single pressure transducer on a regular basis at an interval to be determined by the

ATTACHMENT A
356

17 project team. Prior to drilling, we would obtain permits from the San Joaquin County Environmental Health Department and mark the exploration locations and notify the Underground Service Alert (USA) to obtain utility clearance. • Prepare and deliver conformed as -built drawings in both electronic and hard copy formats.
• The Recharge Basins must pass two acceptance tests: an Initial Acceptance Test as part of and as a condition of Substantial Completion, demonstrating the ability to apply water to the Recharge Basin(s) at the designated application rates determined in the Feasibility Study, and a Final Acceptance Test as part of and as a condition for Final Acceptance and Completion.
• We shall complete all repairs and replacements to equipment, materials, structures, and other improvements constituting the Recharge Basins as necessary after the Acceptance Test and prior to Final Completion.

ATTACHMENT A
357

Appendix D
Client Reference Letters

ATTACHMENT A
358

ATTACHMENT A
359

ATTACHMENT A
360

ATTACHMENT A
361

ATTACHMENT A
362

Resolution No.

STOCKTON CITY COUNCIL

AWARD A PROFESSIONAL SERVICES AGREEMENT TO GATEWAY PACIFIC CONTRACTORS, INC. TO DESIGN AND CONSTRUCT THE DELTA WATER

TREATMENT PLANT GROUNDWATER RECHARGE BASIN PROJECT

In 2012, the M unicipal Utilities Department (MUD) dedicated the Delta Water Supply Project (DWSP) to provide a supplemental surface water supply to the City of Stockton and protect the groundwater basin through conjunctive management; and

The project included a river diversion and pumping station, 12 miles of 54-inch raw water pipeline, and a 30 million gallon per day water treatment plant (DWTP), on a 130-acre parcel on Lower Sacramento Road; and

The next p hase of the DWSP is the development of additional conjunctive use capabilities through groundwater recharge and storage on a 70-acre site located at the DWTP; and

A groundwater recharge project will make use of water available under the City’s Water Right Permit 21176, contract supply from Woodbridge Irrigation District, and potentially other water sources; and

On February 2, 2024, the City advertised the Request for Proposals (RFP) for the design and construction of the Delta Water Treatment Plant Groundwater Recharge Basin Project (PUR 24-016); and

The Municipal Utilities Department staff recommends an award of a professional service agreement to Gateway Pacific Contractors, Inc. in the not-to-exceed amount of $11,033,248; and

The project conforms with the City’s General Plan and the Stockton General Plan based on Policy Land Use – 6.3; now, therefore,

BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF STOCKTON, AS FOLLOWS:

1. The City Council approves the following findings pursuant to Stockton Municipal Code section 3.68.070 in support of an exception to the competitive bidding process:

a. A strict cost-competitive basis for the selection of professional services may lower the quality and thoroughness of the services provided.

363

b. Use of th e RFP process is appropriate for this Professional Services Agreement because it relies on the evaluation of professional qualifications and performance as the basis for the selection of a vendor, which is a typical practice for this type of work. Use of t hese criteria resulted in the selection of a vendor with experience in design and construction of groundwater recharge basins in California.

c. Considering the size, complexity, and schedule requirements of the project, the City does not have sufficient staff resources nor expertise to design and construct a project of this size.

d. The City negotiated the contract following the solicitation of competitive proposals in accordance with SMC section 3.68.070.A.3.

2. A Professional Services Agreement to design and construct the Delta Water Treatment Plant Groundwater Recharge Basins Project and associated infrastructure in the not-to-exceed amount of $11,483,248 between the City of Stockton and Gateway Pacific Contractors, Inc. of Sacramento, CA is hereby awarded, and the City Manager is authorized and directed to execute the same, a copy of which is attached as Exhibit 1 and incorporated by this reference.

3. The City Manager is hereby authorized to take whatever actions are necessary and appropriate to carry out the purpose and intent of this Resolution.

PASSED, APPROVED, and ADOPTED September 10, 2024 .

KEVIN J. LINCOLN II
Mayor of the City of Stockton
ATTEST:

KATHERINE ROLAND, CMC, CPMC
Interim City Clerk of the City of Stockton
364
1 (ZĞǀ͘ϭϬ.Ϯϳ.ϮϮ)

CITY OF STOCKTON

STANDARD AGREEMENT

1. This Agreement is entered into between the City of Stockton (“City”) and (“Contractor”)to provide
as set forth in Exhibit A to this Agreement.
_____________________________________________________________________________

2. The term of this Agreement is as follows, unless amended as described in Exhibit A and Exhibit C section 8:

Commences on: Terminates on:

4. The complete Agreement consists of all the following Agreement documents which by reference are incorporated and made a part of this Agreement. The parties agree to comply with the terms and conditions of this Agreement.
____________________________________________________________________________ I
N WITNESS WHEREOF, the authorized parties have executed this Agreement.

CONTRACTOR
______________________________________________________________________________________________ Contractor’sName (if other than an individual, state whether a corporation, partnership, etc.):
______________________________________________________________________________________________ Authorized Signature Date
______________________________________________________________________________________________ Printed Name and Title of Person Signing
______________________________________________________________________________________________ Address

CITY OF STOCKTON
_________________________________________________________BB________________ +DUU\%ODFN City Manager Date
ATTEST:
____________________________________________________________________________ Katherine Roland, &0&, CPMC, Interim City Clerk
APPROVED AS TO FORM:
/RUL0$VXQFLRQ, City Attorney
BY:

Agreement Number:
(a) Exhibit A – Statement of Work
(b) Exhibit B – Insurance
(c) Exhibit C – General Terms Conditions
(d) Exhibit D –

H
Exhibit E – Compensation Schedule
(f) Exhibit F – Timeline
Gateway Pacific Contractors, Inc. Design and Construction of Recharge Basins June 30, 2029
_____________________________________________________________________________

3. The maximum not to exceed amount to be paid to Contractor for the term of this Agreement, including if authorized, reimbursement of expenses, is: $ 11,483,248 Professional Services Special Terms & Conditions
Gateway Pacific Contractors, Inc.

Evan Lundin, President
8055 Freeport Blvd., Sacramento, CA 95832
August 13, 2024
EXHIBIT 1
365
1 (Rev. 10.30.18)

EXHIBIT A

STATEMENT OF WORK

1. Project Objectives
the Recharge Basins Project is to design and construct groundwater recharge basins and associated infrastructure. The construction of groundwater recharge basins will improve water supply reliability and raise groundwater levels in the Eastern San Joaquin Subbasin. The recharge basins shall also be designed and constructed to provide benefits including habitat for birds, providing water, shelter, and/or breeding places during their migration along the Pacific Flyway.

2. Project Scope
x De
sign and construction of Recharge Basins
x Integration with the City’s SCADA System.
x Complete California Environmental Quality Act (CEQA) documentation for construction of additional treatment capacity for the Delta Water Treatment Plant (DWTP).
x Complete CEQA documentation and construct groundwater recharge basins and associated infrastructure.

3. Specifications
See Detai
led Scope of Work (Attachment A)

4. Major Deliverables
The Rech
arge Basins shall be designed and constructed to achieve at least the infiltration rates ranging from approximately 15,000 AF to 30,000 AF/year (1-2 AF/day), assuming the basins are used 335 days/year. The design should consider operational needs and flexibility and the required maintenance of the basins.

5. Tasks That Support the Deliverables
x Ci
ty approval of 30, 60, 90 and 100% design drawings
x Completion of Final Constructability Check List
x Complete Specifications

6. Internal and External Standards and Guidelines
Comp
ly with the CWTA (Attachment B)
EXHIBIT 1
366
2 (Rev. 10.30.18)

7. Not
ices
Pursuant to Exhibit C – General Terms and Conditions, Paragraph 15 – Notices, the mailing address for all required notices is as follows:

Contractor: Gateway Pacific Contractors, Inc. City: City of Stockton 8055 Freeport BLVD. Attn: Danny Trejo
Sacramento, CA 95832 11373 N Lower Sacramento RD
L o d i , C A 9 5 2 0 2

8. Key Personnel
Mitch
Maidrand
(209) 937-7353
11373 North Lower Sacramento RD
Lodi, CA 95242

10. Option to Renew.

The term of the Agreement may be extended up to two years by a written amendment executed by both parties. However, the total term of the Agreement including the extended term shall not exceed seven years.

EXHIBIT 1
367

DETAILED SCOPE OF WORK

DESIGN BUILD SERVICES FOR THE DELTA WATER

TREATMENT PLANT GROUNDWATER RECHARGE BASIN
Project Overview
The goal of the Recharge Basins Project is to design and construct groundwater recharge basins and associated infrastructure. The construction of groundwater recharge basins will improve water supply reliability and raise groundwater levels in the Eastern San Joaquin Subbasin. The recharge basins shall also be designed and constructed to provide benefits including habitat for birds, providing water, shelter, and/or breeding places during their migration along the Pacific Flyway.

The Project’s Feasibility Study and associated geotechnical investigations were completed by Geosyntech in 2022 and 2023. The Feasibility Study concluded possible infiltration rates between 15,000 AF to 30,000 AF/year (1-2 AF/day) assuming the basins are used 335 days/year. Electrical resistivity testing, soil borings, CPT, soil characterization/sampling, groundwater water quality sampling, and modeling were performed as part of the investigation. Groundwater wells were installed, and a utility survey was also completed as part of the studies. This field work will be the basis for the design of the recharge basins.

The City also expects the Design-Build Team to complete California Environmental Quality Act (CEQA) documentation for construction of additional treatment capacity for the Delta Water Treatment Plant (DWTP) in addition to Recharge Project construc tion. This is needed to pursue additional Delta diversions for groundwater recharge and to meet future potable water demand.

The Design Build Team shall provide engineering services including preparation of plans, specifications, and other supporting documents to co nstruct the Recharge Basins. Services are to include, but are not limited to: final design, permitting, equipment and materials procurement, physical construction of the Recharge Basins, engineering design support during construction, construction management, record drawings, start-up, and acceptance testing. Major Project features are included as exhibits in the Appendix of this scope of work.

ATTACHMENT A
EXHIBIT 1
368
Work Products
Design-Build services and work products shall include:
x Project management for the duration of project.
x Topographic survey.
x Review of pre-design and recommending any changes that could benefit the project. x Project specific CEQA analysis for the Recharge Basins Project. x Project specific CEQA for DWTP expansion.
x Preparation of Piping and Instrumentation Diagrams (P&IDs), Recharge Basins plans, specifications, and other supporting documents.
x Visitor area signage design including grant funding details, groundwater recharge goals, graphic display of recharge, migrant bird information, etc. x Advising the City and facilitating City participation in all material decision making about the Recharge Basins as such decision making ma y affect the project scope and timeline, including City participation in select meetings and communications. x Preparation of the Supervisory Controls and Data Acquisition (SCADA) system design for the Recharge Basins and integration with the City’s WTP SCADA system. x Consideration of, and mitigation for, local community impacts of Recharge Basins operation that result in environmental nuisances (e.g. noise, odors, traffic), landscaping and lighting systems.
x Preparation of all necessary permit applications and facilitation of regulatory agency approval of all permits that are Design-Builder’s responsibility (City will sign permit applications, furnish permit application fees, and attend permitting coordination and review meetings with regulatory agencies as necessary).
x Preparation of unified sets of plans and specifications. x 30, 60, 90% and Final Design Submittals.
x Cost control and change order documentation.
x Design services during construction
x Development of a startup, commissioning and testing plans that will demonstrate facility compliance with design parameters. These plans shall consist of:
x O&M Manuals available prior to startup
x Written Standard Operating Procedures (SOPs)
x Training agenda or checklist

ATTACHMENT A
EXHIBIT 1
369
x Operator engagement and training
x Equipment data sheets to be included in the City’s computerized maintenance management system. We will furnish an equipment data sheet to be included in the City’s computerized maintenance management system.
x Visitor area construction and associated landscaping
x Informational groundwater recharge signage at visitors’ area x Preparation of record drawings (as-built drawings)
x Collection of photo log of construction activities
x Results of the initial Acceptance Test
Our scope of work is below. For clarity we have used the same task number convention in the City’s RFP.

Task 3.1- Planning and Design

3.1.1 Project Management
Project management shall include preparing and submitting a project management approach to the City, coordinating all work of the team members, providing quality assurance/quality control (QA/QC), advance-scheduling of the work and then adhering to the project schedule, providing routine communications, cost controls, invoices, and progress reports, and conducting weekly or biweekly progress review meetings with the City.

Progress review meetings: Schedule and conduct weekly or bi-weekly progress review meetings with City and City’s representatives at MUD offices or via MS Teams. Meeting frequency will be determined on the work status and level of activity. Generate and distribute draft meeting minutes within one business day of each meeting for review by attendees, and final minutes that incorporate review comments. Distribute meeting agendas at least one business day prior to each meeting date. Other documents requiring City review prior to the meeting shall be submitted at least two business days in advance. The City also requires the Design Build Te am to present PowerPoint updates at the City’s Water Advisory Group, Council Water Committee, and City Council meetings twice each.

Public project status meetings and presentations: Prepare and present PowerPoint presentations to the City Council and Committees regarding project status. Six (6) meetings have been budgeted.

Schedule updates : Update the schedule, comparing actual progress to the originally proposed

ATTACHMENT A
EXHIBIT 1
370
schedule, performing critical path analysis, and identifying any necessary corrective measures.

Monthly payment requests and progress reports : Prepare monthly invoices in accordance with actual progress and drawdown schedule and a monthly progress report to accompany each invoice for the previous month’s work. Progress reports shall review major work activities and budget and schedule status by task, summarizing work hours by task and job title and person assigned for the invoice period, and document progress made during the past month, accomplishments, and a look-ahead to the next month’s progress goals.

QA/QC program: Institute and maintain QA/QC program for the project.

Coordination: Coordinate with permitting agencies and other consultants as necessary. The Design- Build Team shall provide meetings minutes to City within five business days of each meeting other consultants.

3.1.2 Startup, Commissioning and Acceptance Testing Plan The Recharge Basins must pass two Acceptance Tests as part of and as a condition of Substantial and Final Completion. The Design Build Team shall prepare this Plan and submit it to the City for approval.

The Design Build Team shall conduct the Acceptance Tests certifying to the City that the Contractor is ready for the test, and the Contractor is in compliance with the applicable terms of the Contract. All training shall be completed before the start of the Acceptance Test.

3.1.3 Field Investigations
Topographic surveying: Provide topographic surveying services as necessary for design of the Recharge Basins. The horizontal and vertical coordinate system and datums will be based on the North American Datum of 1983 (NAD83) converted to the California Grid Coordinate System of 1983, Zone 3 (CA83111-F) as referenced by the City of Stockton Horizontal Control System. The vertical datum will be based on the National Vertical Datum of 1929 (NGVD29) as referenced by available City of Stockton 1996 Local Adjustment (COS96) benchmarks.

Subsurface investigation: Conduct research to identify existing utilities, verify as-built locations, and determine utility locations throughout the project site as needed.

We shall conduct potholing if necessary to locate buried infrastructure, and drill borings to characterize subsurface conditions, to supplement the background documents as necessary for the design. We shall

ATTACHMENT A
EXHIBIT 1
371
also evaluate pertinent engineering properties of the subsurface materials from the geotechnical study.

Raney Geotechnical will evaluate the site, soil, and groundwater conditions across the site and provide geotechnical engineering conclusions and recommendations for the design and construction of the proposed improvements. Raney will also perform supplemental geotechnical exploration and laboratory testing, as needed, during the design phase of the project to assist the design team in preparing project documents.

As part of 30% Design Submittal, Raney would include one day of geotechnical drilling with a truck mounted drill rig to depths of about 20 feet below the existing ground surface. We will also perform laboratory testing to evaluate the engineering properties of the existing soils. The field and laboratory work will be evaluated to determine the suitability of the existing levees and shrinkage of the near- surface soils. The results of the field exploration, laboratory testing, and analysis will be provided in a technical memorandum with recommended geotechnical design criteria. Prior to drilling, we would obtain permits from the San Joaquin County Environmental Health Department and mark the exploration locations and notify the Underground Service Alert (USA) to obtain utility clearance. Note:

The final design of the wells will be based on the lithologic log collected during drilling. A draft design of the wells will be submitted based upon this log for approval by the City within 24-48 hours.

Corrosion protection analysis: Provide Cathodic Protection for pipelines and equipment as required.

3.1.4 Permitting Services
Our team, led by Helix Environmental Planning, shall coordinate with the appropriate regulatory agencies, resolve permitting issues, and prepare a sc hedule and action plan for obtaining all permits that are required to construct and operate the Recharge Basins.

A detailed scope of the recommended services to satisfy California Environmental Quality Act (CEQA) requirements is provided below.

Task 3.1.4.1- Air Quality/Greenhouse Gas Emissions Analysis HELIX will prepare an air quality (AQ) and greenhouse gas (GHG) emissions analysis technical letter report addressing the issues described in the CEQA Guidelines Appendix G. HELIX will coordinate with Client to obtain the data relative to Project phasing, construction methods and timing, export and import of soils and materials, anticipated energy use, and other data relative to AQ and GHG emissions. HELIX

ATTACHMENT A
EXHIBIT 1
372
will calculate pollutant and GHG emissions associated with the construction and operation of the Project using the California Emissions Estimator Model (CalEEMod).

AQ and GHG impacts will be analyzed in accordance with the San Joaquin Valley Air Pollution Control District (SJVAPCD) Guidance for Assessing and Mitigating Air Quality Impacts and the SJVAPCD’s CEQA Air Quality Significance Thresholds. The air quality analysis will include qualitative discussions of the Project’s construction and operational potential toxic air pollutants and odor impacts. Because the Project is not anticipated to generate substantial new operational vehicle trips, local concentrations of carbon monoxide (CO hotspots) resulting from the addition of Project traffic to the areas road will be discussed qualitatively. The analysis will include a discussion of any Project potential conflicts with the SJVAPCD’s air quality plans, including the 2022 Plan for the 2015 8-Hour Ozone Standard Air Quality Management Plan and the 2018 Plan for the 1997, 2006, and 2012 PM2.5 Standards Western Riverside Council of Governments’ Subregional Climate Action Plan. HELIX will also analyze any potential Project inconsistencies with applicable state and regional GHG reduction plans including the California Air Resource Board’s (CARB’s) 2022 Scoping Plan for Achieving Carbon Neutrality and the San Joaquin Council of Governments’ (SJCOG’s) 2022 Regional Transportation Plan and Sustainable Communities Strategy. If new potential significant air quality or GHG impacts are identified, HELIX will recommend appropriate mitigation measures.

HELIX will provide the results of the AQ and GHG analyses in a technical letter report. The report will include descriptions of the existing AQ and GHG environmental setting; a summary of applicable regulations and policies; a summary of the impact conclusions identified in the Stockton Delta Water Supply Project Program Environmental Impact Report (EIR); and the results of the analyses described above, including a determination of the level of significance of impacts in accordance with CEQA Guidelines. HELIX will revise the technical letter report based on comments from the Client and/or City.

Revisions to the modeling or report resulting from changes to the Project description or Project construction assumptions would require a contract augment.

Deliverables: Draft and Final Air Quality and GHG technical letter report (electronic format) Task 3.1.4.2- Biological Resources Assessment
HELIX will prepare a Biological Resources Assessment for the 125-acre City of Stockton Delta Water Treatment Plant located in the City of Lodi, California. HELIX biologists will review available materials regarding existing site conditions, biological resource s, and wetlands (e.g., U.S. Geological Survey [USGS] topographic maps, Natural Resources Conservation Service [NRCS] soils maps, and California

ATTACHMENT A
EXHIBIT 1
373
Natural Diversity Database) for the Project site prior to conducting a field assessment. The biological study area to be utilized during the site assessment will consist of the Project site and a surrounding 250foot buffer, where accessible. HELIX will conduct a field survey to identify dominant plant communities on the site, identify sensitive vegetation communities (including potential aquatic resources), and evaluate the potential for the site to support special-status plant and wildlife species.

Upon completion of the field survey, a Biological Resources Assessment will be prepared that identifies biological resources and potential biological constr aints, such as sensitive habitats, assesses the likelihood of special-status species or habitats to be found on the Project site, and provides recommendations for any further studies or permitting that may be required prior to the development of the site. An assessment of the extent of aquatic resources within the Study Area will also be conducted as part of the field assessment although a formal aquatic resources delineation will not be performed.

The report will also assess the potential for the site to support covered species under the San Joaquin Multi-species Conservation Plan (SJMSCP). The report will include a soils map and a map of biological communities consistent with SJMSCP classifications. Results of the assessments will be included in the Biological Resources Assessment. HELIX can prepare an augment for appropriate surveys for potentially occurring special-status species based on the findings contained in the Biological Resources Assessment.

An initial draft Biological Resources Assessment will be transmitted to Client for review and will then be finalized upon receipt of approval or incorporation of Client comments.

Deliverables: Draft and Final Biological Resources Assessment (electronic format) Task 3.1.4.3 – Aquatic Resources Delineation
HELIX wetland scientists will conduct an Aquatic Resources Delineation (ARD) of the approximately 125-acre City of Stockton Delta Water Treatment Plant Study Area. Mapping of aquatic resources will follow the mapping guidelines stipulated by the U.S. Army Corps of Engineers (USACE; February 10, 2016) USACE Updated Map and Drawing Standards for the South Pacific Division Regulatory Program and will be consistent with the State Water Resources Control Board (SWRCB; April 6, 2021) Procedures for Discharges of Dredged or Fill Material to Waters of the State (Section III, Wetland Delineation). HELIX will also follow the USACE Wetlands Delineation Manual (USACE 1987), the Regional Supplement to the U.S. Army Corps of Engineers Wetland Delineation Manual: Arid West Region (Version 2.0; USACE 2008), and the National Ordinary High-Water Mark (OHWM) Field Delineation Manual for Rivers and Streams (Version: Interim). As applicable, the ARD will also

ATTACHMENT A
EXHIBIT 1
374
incorporate the final rule amending the definition of Clean Water Act (CWA) "waters of the U.S.," as issued by the Environmental Protection Agency (EPA) and USACE on August 29, 2023, in response to the May 25, 2023, U.S. Supreme Court Decision in Sackett v. EPA.

Upon completion of the desktop and field assessments, HELIX will prepare a preliminary ARD Report presenting the methods and results of the delineation. The ARD report will be based on HELIX’s quantification of waters of the U.S. and State on the Project site using the current regulations, written policies, and guidance from the regulatory agencies. The jurisdictional boundaries identified within the ARD are subject to verification by the applicable resource agencies. HELIX will also incorporate comments from the USACE and Regional Water Quality Control Board (RWQCB), as applicable, and will attend a field verification meeting with USACE, if necessary (assumes up to 6 staff hours for field verification and report revisions).

Deliverables: Draft and Final Aquatic Resources Delineation Report (electronic format) Task 3.1.4.3- Cultural Resources Assessment
HELIX will prepare a Cultural Resources Assessment (CRA) for the 125-acre City of Stockton Delta Water Treatment Plant located in the City of Lodi, California.

Records Search, Background Research, and Native American Outreach: HELIX will conduct an archaeological and historical records review and lit erature search through the Central California Information Center (CCIC) of the California Historical Resources Information System, California State University, Stanislaus. The records search area will include the Project site and a 0.25-mile radius. The purpose of the records search is to: (1) identify cultural resources previously documented within and immediately adjacent to the project site; (2) to determine if the project site has been previously surveyed, when those surveys took place, and how the surveys were conducted; and (3) to ascertain the potential for cultural resources to be found in the project site. The records search will include reviews of the appropriate USGS topographic maps where cultural resources are mapped, archaeological site and historic structure records, and data from previous surveys and research reports. In addition, the state of California Historical Landmarks, and the California Points of Historical Interest will be examined to ascertain the presence of designated, evaluated, and/o r historic-era resources in the vicinity of the APE.

HELIX will also contact the Native American Heritage Commission (NAHC) to conduct a records search of their Sacred Lands File (SLF) for the presence of Native American sacred sites or human remains in

ATTACHMENT A
EXHIBIT 1
375
the vicinity of the project area. Individual outreach to Native American organizations and/or individuals will not be conducted.

Cultural Resources Survey: HELIX will conduct a survey of the project site to identify the presence of prehistoric and/or historic resources that might be impacted by project activities. The fieldwork will consist of an intensive visual inspection of the project site ground surface by HELIX staff on foot using transects spaced 5- to 10- meters apart.

HELIX’s archaeologist will inspect all accessible portions of the project site. During the survey, the ground surface will be examined for the presence of prehistoric artifacts (e.g., flaked stone tools, tool- making debris, stone milling tools), historic artifacts (e.g., metal, glass, ceramics), sediment discoloration that might indicate the presence of midden, and depressions and other features that might indicate the former presence of structures or build ings (e.g., postholes, foundations). If resources are encountered during the survey, they will be photogr aphed, and their position(s) will be recorded with GPS equipment. No artifacts will be collected during HELIX’s survey.

Cultural Resources Technical Report: The results of the records search, background research, NAHC coordination, and cultural resources survey will be presented in a CRA technical report. This report will include a description of the methods and results of the records search, background research, and field survey undertaken for the project. The report will conclude with recommendations for further study, evaluation, or mitigation of any cultural or historic resources that may be affected by the proposed project.

HELIX will respond to one round of comments from the County on the CRA technical report. The comments are anticipated to be minor in nature a nd not require additional survey work or changes to the project’s APE.

Deliverables: Draft and Final CRA Technical Report (electronic format) Task 3.1.4.4- Noise Analysis and Vibration
HELIX will prepare a noise and vibration analysis technical letter report. HELIX will conduct a site visit to evaluate the existing noise environment on and around the Project site. The site visit will include up to three short-term (10- to 15minute) noise measurements. HELIX will analyze the Project’s noise and vibration impact, addressing the issues described in the State CEQA Guidelines Appendix G. Because the Project site is located outside the City limits, Project noise will be analyzed in accordance with the

ATTACHMENT A
EXHIBIT 1
376
significance criteria established in both the City’s and San Joaquin County’s code of ordinance and general plan, and/or significance criteria recommended by other public agencies. Based on estimates of construction equipment for the AQ/GHG Emissions analysis, HELIX will model off-road equipment noise levels received at nearby noise sensitive land uses (e.g., residences) using the Federal Highway Administration’s (FHWA’s) Roadway Construction Noise Model (RCNM) and provide noise modeling results for up to three noise sensitive land use locations around the Project site. HELIX will estimate changes in Project operational noise for the DWTP based on new stationary equipment assumptions and new or increased off-road maintenance equipment assumptions provided by the Client. HELIX will estimate changes Project operational noise levels received at nearby noise sensitive land uses using appropriate calculation methodology or exterior noise computer aided modeling.

HELIX will provide the results of the noise and vibration analyses in a technical letter report. The report will include descriptions of the existing noise environmental setting; a summary of applicable regulations and policies; a summary of the impact conclusions identified in the Stockton Delta Water Supply Project Program EIR; and the results of the analyses described above, including a determination of the level of significance of impacts in accordance with CEQA Guidelines. HELIX will revise the technical letter report once based on comments from the Client and/or City. Revisions to the modeling or report resulting from changes to the Project description or Project construction assumptions would require a contract augment.

Deliverables: Draft and Final Noise and Vibration technical letter report (electronic format) Task 3.1.4.5- CEQA Initial Study/Mitigated Negative Declaration Based on review of the Project description and Feasibility Study Report, it is assumed a CEQA Initial Study/Mitigated Negative Declaration (IS/MND) is the appropriate CEQA compliance document for the proposed Project. The IS/MND will follow the format in Appendix G of the State CEQA Guidelines.

HELIX will develop a CEQA IS/MND that will tier from the Stockton Delta Water Supply Project Program EIR that was certified in 2005. The IS/MND will consist of Project description text and graphics, a summary of the Project’s environmental effects in the context of the certified EIR, as well as the supporting environmental checklist in Appendix G. HELIX will incorporate the findings of the technical studies into the IS/MND. All other environmental issue areas will be presented and analyzed qualitatively. The IS/MND will contain all mandatory elements including the following:
x Project Description. The Project description will describe the baseline information for the project site, as well as the major elements (expansion of capacity for the DWTP and

ATTACHMENT A
EXHIBIT 1
377
construction of three groundwater recharge basins) of the Project, and will include a discussion of the proposed construction and operation of the Project; x Figures. Figures identifying the local and regional location of the Project site and other Project characteristics as relevant to the CEQA analysis; and x Disclosure of potential environmental impacts resulting from implementation of the proposed Project. The IS/MND will contain a narrative for each resource issue in support of each conclusion and it will include, but may not be li mited to, discussions relevant to aesthetics, agricultural and forestry resources, air quality, biological resources, cultural resources, energy, geology and soils, greenhouse gas emissions, hazards and hazardous materials, hydrology and water quality, land use, mineral resources, noise, population and housing, public services, recreation, transportation, tribal cultural resources, utilities/service systems, wildfire, and mandatory findings of significance.

HELIX will produce an electronic version of the Administrative Draft IS/MND for City review. Upon receipt of a single consolidated set of written comments, HELIX will revise the Administrative Draft IS/MND as necessary to address comments and will provide an electronic copy of the Public Review Draft IS/MND.

HELIX will provide the City with an electronic copy of the required Notice of Intent to Adopt a Mitigated Negative Declaration (NOI), Notice of Completion (NOC), and Summary Form for review by the City.

Following City approval of the Public Review Draft IS/MND and draft notices, HELIX will upload the Public Review Draft IS/MND, NOI, NOC, and Summary Form to the State Clearinghouse on behalf of the City. It is assumed that the City will circulate the NOI in accordance with Section 15072(b) of the CEQA Guidelines and file the NOI with the San Joaquin County Clerk. This scope of work does not include the production of hardcopies of the Public Review Draft IS/MND.

Following the close of the 30-day public comment period, HELIX will consult with the City and review written comments received on the Public Review Draft IS/MND. HELIX will prepare draft responses to comments received on the environmental document for City review. It is assumed that no more than ten public comment letters would be received, comments will be minor (not requiring additional analysis or studies), and responses will consist primarily of clarifying information and directing commenters to the appropriate discussion in the IS/MND. Once the City has reviewed and approved the responses to comments, the comments and responses will be integrated by HELIX into a Final IS/MND.

ATTACHMENT A
EXHIBIT 1
378
HELIX’s Project Manager will plan to attend up to two (2) public hearings in-person to respond to questions on the analysis presented in the IS/MND as needed. HELIX will prepare the Notice of Determination (NOD) for filing. HELIX will file the NOD with the County Clerk and State Clearinghouse within five (5) working days following adoption of the Final IS/MND. It is assumed the City will pay associated CDFW filing fees.

Deliverables:
x Administrative Draft, Public Review Draft, and Final IS/MND (electronic format) x Draft and Final NOI, NOC, and Summary Form (electronic format) x Draft and Final NOD (electronic format)

3.1.5 Design Packages
Nexgen will lead the design effort. Subconsultants for the design tasks include ControlPoint for electrical and controls design, Helix Environmental Planning fo r the visitors parking and landscaping plan, and Raney Geotechnical for supplemental geotechnical work in support of the design.

3.3.5.1- Validation of Feasibility and Pre-Design Studies One project kickoff meeting and then one validation workshop is anticipated to review the team’s findings and achieve consensus with the City with regard to the evaluation of the Feasibility Study/Pre-Design.

Any recommendations for incorporation changes into the design to be submitted no later than 30 days after the NTP. This should include any value engineering recommendations.

Deliverables: Workshop agendas and materials and meeting minutes (2 workshops). Draft and final technical memo on scope clarifications or design changes.

3.1.5.2 - 30, 60, 90, and 100% Design Submittals
We shall prepare design packages to facilitate permitting and construction of the Recharge Basins. City shall review the design packages and construction/procurement submittals to confirm such conformance within 21 days after receipt.

We shall prepare drawings generally in accordance with City standards and using the latest edition of AutoCAD after submitting templates that demonstrate compliance with the City standards.

Design packages will contain plans, sections, elevations, and applicable details including:

ATTACHMENT A
EXHIBIT 1
379
x Drawing index
x Design Criteria
x Standard details for each discipline
x Civil site layouts and grading, paving, and outside piping plans and sections x Pipeline plans and profiles
x Decant pipe and flow meter design plans and specifications x Connection of 24” flow meter to ozone building design plans and specifications x Landscape, irrigation, and exterior lighting plans (see below) x Structural and architectural plans, sections and elevations x Process schematics and mechanical plans and sections
x Single-line diagrams
x SCADA system architecture, P&IDs and block diagrams
x Electrical design, inspection, and testing of a new500 HP VFD located in the Ozone building electrical room.
x Automatic gate and fencing upgrades
x Reference drawings
x Preparation of record drawings (as-built drawings)
Deliverables: 30% Design Submittal, 30% Design workshop, 30% Design meeting summary and planned changes to design; 60% Design Submittal, 60% Design workshop, 60% Design meeting summary and planned changes to design; 90% Design Submittal, 90% Design workshop, 90% Design meeting summary and planned changes to design, 100% Design submittal.

3.1.5.3- Visitors Area & Landscape Plan (included within 30% Design Package) HELIX will develop a color rendered Preliminary Landscape Plan illustrating the concept for site development including the proposed visitor’s area, parking lot, recharge basin viewing areas with shade structure, educational signage, tree locations, plant palette, pedestrian hardscape areas and other landscape improvements. The parking layout will be provided by the civil engineer and include approximately 15 standard and accessible stalls with additional space for a 10-person passenger van.

The plan will be developed using base plan data from the City and/or civil engineer and conform with the City’s landscape and development standards.

The goals for the landscape design include providing shaded spaces for visitors to learn about the facility and its operations along with supporting educational signage and native and/or low water-use plantings. Landscape improvements will be limited to those immediately adjacent to the parking area and edge of basin – no landscaping will be provided along Lower Sacramento Road or the Project entry

ATTACHMENT A
EXHIBIT 1
380
drive. This plan will be suitable for City review and comment prior to the start of construction documents.

HELIX, City staff, and the consultant team will att end a virtual meeting to discuss the design, elicit feedback, and answer any questions. We will make one round of consolidated revisions based on the comments received.

HELIX will attend one (1) in-person meeting and up to fo ur (4) virtual meetings with Client, consultant team and/or City staff to review comments, disc uss the design, coordinate, and/or respond to any questions or concerns.

Deliverables: Color rendered Preliminary Landscape Plan in electronic format (.pdf)

3.1.5.4- Landscape Construction Documents (included in 90 and 100 % Design Package) HELIX’s Landscape Architecture Group will prepare the necessary plans and specifications for the proposed landscape improvements based on the approved preliminary design. The 100% construction documents will consist of a landscape layout plan, irrigation plan with MWELO (California Model Efficient Landscape Ordinance) documentation, planting plan (with shade tree calculations), and construction details. Specifications will be prepared using the Construction Specifications Institute (CSI) format and/or reference to City standard specifications (as applicable). The 100% construction documents will be provided to Nexgen for inclusion within the overall plan set to the City.

We anticipate no more than two rounds of consolidated revisions based on the received comments.

HELIX will conduct a conference call with City staff to review the plans and discuss any additional questions or concerns. A memorandum will be prepared summarizing any revisions or changes.

Following approval of the 100% construction documents, a signed copy of the Final Construction Documents will be provided to the Client and City for their records.

Also included as part of this task, HELIX will develop up to four (4) draft designs for the educational signage to be located within the visitor area. This includes preparing the graphics, obtaining photos, and securing permission for copyrighted photos, developing text/verbiage, and performing any necessary research. We will submit the draft signs for client and City review and make one round of consolidated revisions based on the comments received. HELIX will incorporate final edits to produce camera-ready artwork for production and coordination with the signage fabricator. The sign fabricator will invoice the general contractor directly.

During the Construction Documents task, HELIX will attend one (1) in-person meeting and up to six (6)

ATTACHMENT A
EXHIBIT 1
381
virtual meetings with Client, consultant team and/or City staff to review comments, discuss the design, coordinate, and/or respond to any questions or concerns.

Task 3.2- Construction and Related Startup Services
The following work is included in the construction and startup/ acceptance testing of the groundwater Recharge Basins. We will construct facilities described in the 2023 Feasibility Study with the details provided in the Technical Services Section of the Proposal. Those details are listed below for clarity.

Our cost estimate has been prepared consistent with these assumptions. x Pipe size and alignments as shown on included figures x Buried transmission pipes shall be cement mortar lined and coated steel pipe per AWWA C205. Exposed pipe shall be epoxy lined and coated.
x Connection to the 54-inch supply pipe with one isolation valve and magnetic flowmeter above grade on a concrete slab as shown on the drawing. x Forebay design (baffle and overflow weir) as show on the attached figures x The parking layout will include 15 standard and accessible stalls with additional space for a 10-person passenger van. Shaded spaces for visitors to learn about the facility and its operations along with supporting educational signage and native and/or low water-use plantings. Landscape improvements will be limited to those immediately adjacent to the parking area and edge of basin
x Flow and water level into each basin will be co ntrolled by a 30-inch butterfly valve at each perc basin. A water level transducer and stilling well at each basin will provide input for the valves to open or close.
x The forebays will be armored with rip-rap at 2:1 slopes. The interior levees of the percolation basins will be filled at 3:1 slopes to encourage emerging vegetation along the perimeters. x One 500 HP VFD will be added to treated water pump # 3 or #4 in the ozone electrical building.

Other work necessary for a complete project includes:
x Procurement of equipment and materials separately from construction phase as necessary to achieve project delivery schedule.
x Integration with the City’s SCADA system.
x Site safety and security during construction including coordination of site visits.

ATTACHMENT A
EXHIBIT 1
382
x Completion of start-up and all required acceptance tests, SOP development, training, and including provision of chemicals during start-up.
x Preparation of an operations and maintenance (O&M) manual, as-built drawings and other project documentation in searchable Adobe Acrobat format; as-built drawings also provided on Mylar sheets and AutoCAD files.
x Training of the City staff.
x We will install five nested groundwater monitoring wells similar to Monitoring Well MW-1 already installed at the site. The wells will extend about 200 feet below the existing ground surface and will be installed in accordance with San Joaquin County Environmental Health Department requirements. Each well will be monitored with a single pressure transducer on a regular basis at an interval to be determined by the project team. Prior to drilling, we would obtain permits from the San Joaquin Co unty Environmental Health Department and mark the exploration locations and notify the Underground Service Alert (USA) to obtain utility clearance.
x Prepare and deliver conformed as-built drawings in both electronic and hard copy formats. x The Recharge Basins must pass two acceptance tests: an Initial Acceptance Test as part of and as a condition of Substantial Completion, demonstrating the ability to apply water to the Recharge Basin(s) at the designated application rates determined in the Feasibility Study, and a Final Acceptance Test as part of and as a condition for Final Acceptance and Completion.
x We shall complete all repairs and replacements to equipment, materials, structures, and other improvements constituting the Recharge Basins as necessary after the Acceptance Test and prior to Final Completion.
x We will provide the results of the initial Acceptance Test. x We will create a photo log of construction activities.

ATTACHMENT A
EXHIBIT 1
383
Exhibits and Schedule

ATTACHMENT A
EXHIBIT 1
384

ATTACHMENT A
EXHIBIT 1
385

ATTACHMENT A
EXHIBIT 1
386

ATTACHMENT A
EXHIBIT 1
387

ATTACHMENT A
EXHIBIT 1
388

ATTACHMENT A
EXHIBIT 1
389

ATTACHMENT B
EXHIBIT 1
390

ATTACHMENT B
EXHIBIT 1
391

ATTACHMENT B
EXHIBIT 1
392

ATTACHMENT B
EXHIBIT 1
393

ATTACHMENT B
EXHIBIT 1
394

ATTACHMENT B
EXHIBIT 1
395

ATTACHMENT B
EXHIBIT 1
396

ATTACHMENT B
EXHIBIT 1
397

ATTACHMENT B
EXHIBIT 1
398

ATTACHMENT B
EXHIBIT 1
399

ATTACHMENT B
EXHIBIT 1
400

ATTACHMENT B
EXHIBIT 1
401

ATTACHMENT B
EXHIBIT 1
402

ATTACHMENT B
EXHIBIT 1
403

ATTACHMENT B
EXHIBIT 1
404

ATTACHMENT B
EXHIBIT 1
405

ATTACHMENT B
EXHIBIT 1
406

ATTACHMENT B
EXHIBIT 1
407

ATTACHMENT B
EXHIBIT 1
408

ATTACHMENT B
EXHIBIT 1
409

ATTACHMENT B
EXHIBIT 1
410
REV 2022-05-17
Insurance Requirements for Construction Contracts
()
Contractor shall procure and maintain for the duration of the contract, and for 5 years thereafter, insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Contractor, his agents, representatives, employees, or subcontractors.

MINIMUM SCOPE AND LIMIT OF INSURANCE
Coverage shall be at least as broad as:

1. Commercial General Liability (CGL): Insurance Services Office (ISO) Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $5,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit.

2. Automobile Liability: Insurance Services Office Form CA 0001 covering Code 1 (any auto), with limits no less than $5,000,000 per accident for bodily injury and property damage.

3. Workers’ Compensation insurance as required by the State of California, with Statutory Limits, and Employers’ Liability insurance with a limit of no less than $1,000,000 per accident for bodily injury or disease.

4. Professional Liability (if Design/Build), with limits no less than $2,000,000 per occurrence or claim, and $2,000,000 policy aggregate.

5. Contractors Pollution Liability applicable to the work being performed, with a limit no less than $2,000,000 per claim or occurrence and $2,000,000 aggregate per policy period of one year.

6. Builder’s Risk (Course of Construction) insurance utilizing an “All Risk” (Special Perils) coverage form, with limits equal to the completed value of the project and no coinsurance penalty provisions.

7. Surety Bonds as described below.

EXHIBIT 1
411
REV 2022-05-17

If the contractor maintains broader coverage and/or higher limits than the minimums shown above, the City of Stockton requires and shall be entitled to the broader coverage and/or the higher limits maintained by the contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City of Stockton.

Self-Insured Retentions

Self-insured retentions must be declared to and approved by the City of Stockton. The City of Stockton may require the Contractor to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention. The policy language shall provide, or be endorsed to provide, that the self-insured retention may be satisfied by either the named insured or City of Stockton. The CGL and any policies, including Excess liability policies, may not be subject to a self-insured retention (SIR) or deductible that exceeds $25,000 unless approved in writing by City of Stockton. Any and all deductibles and SIRs shall be the sole responsibility of Contractor or subcontractor who procured such insurance and shall not apply to the Indemnified Additional Insured Parties. City of Stockton may deduct from any amounts otherwise due Contractor to fund the SIR/deductible. Policies shall NOT contain any self-insured retention (SIR) provision that limits the satisfaction of the SIR to the Named Insured.

The policy must also provide that Defense costs, including the Allocated Loss Adjustment Expenses, will satisfy the SIR or deductible. City of Stockton reserves the right to obtain a copy of any policies and endorsements for verification.

Other Insurance Provisions

The insurance policies are to contain, or be endorsed to contain, the following provisions:

1. The City of Stockton, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts, or equipment furnished in connection with such work or operations and automobiles owned, leased, hired, or borrowed by or on behalf of the Contractor.

General liability coverage can be provided in the form of an endorsement to the Contractor’s insurance (at least as broad as ISO Form CG 20 10 11 85 or both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 forms if later revisions used).

Additional insured Name of Organization shall read “City of Stockton, its officers, officials, employees, and volunteers.” Policy shall cover City of Stockton, its officers, officials, employees, and volunteers for all locations work is done under this contract.

2. For any claims related to this project, the Contractor’s insurance coverage shall be primary and non-contributory insurance coverage at least as broad as ISO CG EXHIBIT 1
412
REV 2022-05-17

20 01 04 13 as respects the City of Stockton, its officers, officials, employees, and volunteers. Any insurance or self-insurance maintained by the City of Stockton, its officers, officials, employees, or volunteers shall be excess of the Contractor’s insurance and shall not contribute with it. This requirement shall also apply to any Excess or Umbrella liability policies. The City of Stockton does not accept endorsements limiting the Contractor’s insurance coverage to the sole negligence of the Named Insured.

3. Each insurance policy required by this clause shall provide that coverage shall not be canceled, except with notice to the City of Stockton.

BBuilder’s Risk (Course of Construction) Insurance
Contractor may submit evidence of Builder’s Risk insurance in the form of Course of Construction coverage. Such coverage shall name the City of Stockton as a loss payee as their interest may appear.

If the project does not involve new or major reconstruction, at the option of the City of Stockton, an Installation Floater may be acceptable. For such projects, a Property Installation Floater shall be obtained that provides for the improvement, remodel, modification, alteration, conversion or adjustment to existing buildings, structures, processes, machinery and equipment. The Property Installation Floater shall provide property damage coverage for any building, structure, machinery or equipment damaged, impaired, broken, or destroyed during the performance of the Work, including during transit, installation, and testing at the City of Stockton’s site.

Claims Made Policies (Professional & Pollution only)
If any coverage required is written on a claims-made coverage form:

1. The retroactive date must be shown, and this date must be before the execution date of the contract or the beginning of contract work.

2. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of contract work.

3. If coverage is cancelled or non-renewed, and not replaced with another claims-made policy form with a retroactive date prior to the contract effective, or start of work date, the Contractor must purchase extended reporting period coverage for a minimum of five (5) years after completion of contract work.

4. A copy of the claims reporting requirements must be submitted to the City of Stockton for review.

5. If the services involve lead-based paint or asbestos identification/remediation, the Contractors Pollution Liability policy shall not contain lead-based paint or asbestos exclusions. If the services involve mold identification/remediation, the Contractors EXHIBIT 1
413
REV 2022-05-17

Pollution Liability policy shall not contain a mold exclusion, and the definition of Pollution shall include microbial matter, including mold.

UUmbrella or Excess Policies
The Contractor may use Umbrella or Excess Policies to provide the liability limits as required in this agreement. This form of insurance will be acceptable provided that all of the Primary and Umbrella or Excess Policies shall provide all of the insurance coverages herein required, including, but not limited to, primary and non-contributory, additional insured, Self-Insured Retentions (SIRs), indemnity, and defense requirements. The Umbrella or Excess policies shall be provided on a true “following form” or broader coverage basis, with coverage at least as broad as provided on the underlying Commercial General Liability insurance. No insurance policies maintained by the Additional Insureds, whether primary or excess, and which also apply to a loss covered hereunder, shall be called upon to contribute to a loss until the Contractor’s primary and excess liability policies are exhausted.

Acceptability of Insurers
Insurance is to be placed with insurers authorized to conduct business in the state with a current A.M. Best rating of no less than A: VII, unless otherwise acceptable to the City of Stockton.

Waiver of Subrogation
Contractor hereby agrees to waive rights of subrogation which any insurer of Contractor may acquire from Contractor by virtue of the payment of any loss.

Contractor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation. The Workers’ Compensation policy shall be endorsed with a waiver of subrogation in favor of the City of Stockton for all work performed by the Contractor, its employees, agents and subcontractors.

Verification of Coverage
Contractor shall furnish the City of Stockton with original certificates and amendatory endorsements or copies of the applicable policy language effecting coverage required by this clause and a copy of the Declarations and Endorsements Pages of the CGL and any Excess policies listing all policy endorsements. All certificates and endorsements and copies of the Declarations & Endorsements pages are to be received and approved by the City of Stockton before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the Contractor’s obligation to provide them. The City of Stockton reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time. City of Stockton reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.

Subcontractors
EXHIBIT 1
414
REV 2022-05-17

Contractor shall require and verify that all subcontractors maintain insurance meeting all requirements stated herein, and Contractor shall ensure that City of Stockton is an additional insured on insurance required from subcontractors. For CGL coverage, subcontractors shall provide coverage with a form at least as broad as CG 20 38 04 13.

DDuration of Coverage
CGL & Excess liability policies for any construction related work, including, but not limited to, maintenance, service, or repair work, shall continue coverage for a minimum of 5 years for Completed Operations liability coverage. Such Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the contract of work .

Surety Bonds
Contractor shall provide the following Surety Bonds:

1. Bid Bond

2. Performance Bond

3. Payment Bond

4. Maintenance Bond

The Payment Bond and the Performance Bond shall be in a sum equal to the contract price. If the Performance Bond provides for a one-year warranty a separate Maintenance Bond is not necessary. If the warranty period specified in the contract is for longer than one year a Maintenance Bond equal to 10% of the contract price is required. Bonds shall be duly executed by a responsible corporate surety, authorized to issue such bonds in the State of California and secured through an authorized agent with an office in California.

Special Risks or Circumstances
City of Stockton reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other circumstances.

Certificate Holder Address

The address for mailing certificates, endorsements and notices shall be:

City of Stockton
Its Officers, Officials, Employees and Volunteers
400 E Main Street, 3rd Floor – HR
Stockton, CA 95202
EXHIBIT 1
415
REV 2022-05-17

EXHIBIT 1
416
(Rev. 10.30.18; Mod Ϭϱ͘Ϭϴ͘ϮϯZD͖DŽĚϬϯ͘Ϯϳ͘ϮϰZDͿ

EXHIBIT C

GENERAL TERMS AND CONDITIONS

1. Goods, Equipment and Services. Subject to the terms and conditions set forth in this Agreement, Contractor shall provide to City the services described in Exhibit A of the Agreement. Contractor shall provide said services at the time, place and in the manner specified in Exhibit A of the Agreement.

2. City Assistance, Facilities, Equipment and Clerical Support. Except as set forth in Exhibit A, Contractor shall, at its sole cost and expense, furnish and maintain all facilities and equipment that may be requir ed for furnishing services pursuant to this Agreement. If applicable, City shall furnish to Contractor only the facilities and equipment listed in Exhibit A to the Agreement.

3. Compensation . City shall pay Contractor for services rendered pursuant to this Agreement as described more particularly in Exhibit A and Exhibit E to the Agreement.

3.1 Invoices submitted by Contractor to City must contain a brief description of work performed, time spent and City reference number. Within thirty (30) days of receipt of Contractor’s invoice, City will review invoice, and if acceptable make payment on approved invoice.

3.2 Upon completion of work and acceptance by City, Contractor shall have sixty (60) days in which to submit final invoicing for payment. An extension may be granted by City upon receiving a written request thirty (30) days in advance of said time limitation. The City shall have no obligation or liability to pay any invoice for work performed which the Contractor fails or neglects to submit within sixty (60) days, or any extension thereof granted by the City, after the work is accepted by the City.

4. Sufficiency of Contractor’s Work . All Contractor services, work, and deliverables shall be performed in a good and workmanlike manner with due diligence in accordance with the degree of skill normally exercised by similar contractors supplying services and work of a similar nature, and in conformance with applicable laws, codes and professional standards. Contractor’s work shall be adequate and sufficient to meet the purposes of this Agreement.

5. Ownership of Work . All reports, work product, all other documents completed or partially completed by Contractor or its appr oved subcontractors, in performance of this Agreement, and if applicable, drawings, desi gns, and plan review comments shall become the property of the City. Any and all copyright able subject matter in all materials is hereby assigned to the City and the Contractor and its approved subcontractors agree 1 EXHIBIT 1
417
(Rev. 10.30.18; Mod Ϭϱ͘Ϭϴ͘ϮϯZD͖DŽĚϬϯ͘Ϯϳ͘ϮϰZDͿ
to execute any additional documents that may be necessary to evidence such assignment. All materials shall be delivered to the City upon completion or termination of the work under this Agreement. If any materials are lost, damaged or destroyed before final delivery to the City, the Contractor shall replace them at its own expense.

Contractor and its approved subcontractors shall keep materials confidential. Materials shall not be used for purposes other than performance of services under this Agreement and shall not be disclosed to anyone not connected with these services, unless the City provides prior written consent.

6. Timeliness. Time is of the essence in this Agreement. Further, Contractor acknowledges that the failure of Contractor to comply with the time limits described in Exhibit A and Exhibit F may result in economic or other losses to the City.

7. Changes. Both parties to this Agreement understand that it may become desirable or necessary during the term of this Agreement for City to modify the scope of services provided for under this Agreement. Any material extension or change in the scope of work shall be discussed with City and the change and cost shall be memorialized in a written amendment to the original contract prior to the performance of the additional work. Until the amendment is so executed, City will not be responsible to pay any charges Contractor may incur in performing such additional services, and Contractor shall not be required to perform any such additional services.

8. Amendment. No variation of the terms of this Agreement shall be valid unless an amendment is made in writing and signed by both parties.

9. Contractor’s Status.

9. 1 In performing the obligations set forth in this Agreement, Contractor shall have the status of an independent contractor and Contractor shall not be considered to be an employee of the City for any purpose. All persons working for or under the direction of Contractor are its agents and employees and are not agents or employees of City. Contractor by virtue of this Agreement, has no authority to bind or incur any obligation on behalf of City. Except as expressly provided in Exhibit A, Contractor has no authority or responsibility to exercise an y rights or power vested in the City. No agent, officer or employee of the City is to be considered an employee of the Contractor. It is understood by both Contractor and City that this Agreement shall not be construed or considered under any circumstances to create an employer-employee relationship or a joint venture.

9.2 Contractor shall determine the method, details and means of performing the work and services to be provided by Contractor under this Agreement. Contractor shall be responsible to City only for the requirements and results specified in this Agreement and, except as expressly provided in this Agreement, shall not be subjected to City's 2 EXHIBIT 1
418
(Rev. 10.30.18; Mod Ϭϱ͘Ϭϴ͘ϮϯZD͖DŽĚϬϯ͘Ϯϳ͘ϮϰZDͿ
control with respect to the physical action or activities of Contractor in fulfillment of this Agreement. Contractor has control over the manner and means of performing the services under this Agreement. If necessa ry, Contractor has the responsibility for employing other persons or firms to assist Contractor in fulfilling the terms and obligations under this Agreement.

9.3 If in the performance of this Agreem ent any third persons are employed by Contractor, such persons shall be entirely and exclusively under the direction, supervision and control of Contractor. All terms of employment including hours, wages, working conditions, discipline, hiring and discharging or any other term of employment or requirements of law shall be determined by the Contractor.

9.4 It is further understood and agreed that Contractor must issue W-2 forms or other forms as required by law for income and employment tax purposes for all of Contractor's assigned personnel under the terms and conditions of this Agreement.

10. Subcontractor.

10.1 Subcontractors shall not be recognized as having any direct or contractual  relationship with City. Contractor shall be responsible for the work of subcontractors, which shall be s ubject to the provisions of this Agreement. Subcontractors will be provided with a copy of the Agreement and be bound by its terms. Contractor is responsible to City for the acts and omissions of its subcontractors and persons directly or indirectly employed by them.

10.2 If in the performance of this Agreement any third persons are employed by Contractor, such persons shall be entirely and exclusively under the direction, supervision and control of Contractor. All terms of employment including hours, wages working conditions, discipline, hiring, and discharging or any other term of employment or requirement of law shall be determined by Contractor.

10.3 It is further understood and agreed that DOO6XEFontractorV must issue W-2 IRUPVRURWKHUIRUPVDVUHTXLUHGE\ODZIRULQFRPHDQGHPSOR\PH QWWD[SXUSRVHVIRUDOO RI6XEFRQWUDFWRUVSHUVRQQHO

11. Termination.

11.1 Termination for Convenience of City. The City may terminate this Agreement at any time by mailing a notice in writing to Contractor. The Agreement shall then be deemed terminated, and no further work shall be performed by Contractor. If the Agreement is so terminated, the Contractor shall be paid for the work actually completed at the time the notice of termination is received. 3 EXHIBIT 1
419
(Rev. 10.30.18; Mod 0ϱ͘Ϭϴ͘ϮϯZD͖DŽĚϬϯ͘Ϯϳ͘ϮϰZD)

11. 2 Should either party default in the performance of this Agreement or materially breach any of its provisions, the other party, at that party’s option, may terminate this Agreement by giving written notification to the other party.

11.3 Funding- Non-Appropriation. It is mutually understood between the Parties that payment to the Contractor for performance shall be dependent upon the availability of appropriations by the City Council for the purposes of this Agreement. No legal liability on the part of the City for any paym ent may arise under this Agreement until funds are made available and until the Cont ractor has received funding availability, which will be confirmed in writing. If funding for any fiscal year is reduced or deleted, or if the City loses funding for any reason, the Cit y, in its sole discretion, shall have the option to either (a) cause this Agreement to be canceled or terminated pursuant to applicable provisions of the Agreement; or (b) offer to amend the Agreement to reflect the reduced funding for this Agreement.
 Non-Assignability. The Contractor shall not assign, sublet, or transfer this Agreement or any interest or obligation in the Agreement without the prior written consent of the City, and then only upon such terms and conditions as City may set forth in writing. Contractor shall be solely responsible for reimbursing subcontractors.  Indemnity and Hold Harmless. 7R WKH IXOOHVW H[WHQW SHUPLWWHG E\ ODZ &RQWUDFWRU VKDOO KROG KDUPOHVV GHIHQG DQG LQGHPQLI\ &LW\ RI 6WRFNWRQ DQG LWV RIILFHUV RIILFLDOV HPSOR\HHV DQG YROXQWHHUV IURP DQG DJDLQVW DQ\ DQG DOO OLDELOLW\ ORVV GDPDJH H[SHQVH FRVWV
LQFOXGLQJ ZLWKRXW OLPLWDWLRQ FRVWV DQG
IHHV RI OLWLJDWLRQ
 RI HYHU\ QDWXUH DULVLQJ RXW RI RU LQ FRQQHFWLRQ ZLWK &RQWUDFWRU¶V SHUIRUPDQFH RI ZRUN KHUHXQGHU RU LWV IDLOXUH WR FRPSO\ ZLWK DQ\ RI LWV REOLJDWLRQV FRQWDLQHG LQ WKLV DJUHHPHQW H[FHSW VXFK ORVV RU GDPDJH ZKLFK ZDV FDXVHG E\ WKH VROH QHJOLJHQFH RU ZLOOIXO PLVFRQGXFW RI WKH &LW\ RI 6WRFNWRQ 7KLV REOLJDWLRQ LV LQGHSHQGHQW RI DQG VKDOO QRW LQ DQ\ ZD\ EH OLPLWHG E\ WKH PLQLPXP LQVXUDQFH REOLJDWLRQV FRQWDLQHG LQ WKLV DJUHHPHQW 7KHVH REOLJDWLRQV VKDOO VXUYLYH WKH FRPSOHWLRQ RU WHUPLQDWLRQ RI WKLV DJUHHPHQW
 Insurance. During the term of this Agreement, Contractor shall maintain in full force and effect at its own cost and expense the insurance coverage as set forth in the attached Exhibit B to this Agreement and shall otherwise comply with the other provisions of Exhibit B to this Agreement.

Notices. All notices herein required shall be in writing and shall be sent by certified or registered mail, postage prepaid, addressed in Exhibit A to this Agreement.  Conformance to Applicable Laws. Contractor shall comply with all applicable Federal, State, and Municipal laws, rules, and ordinances. Contractor shall not discriminate in the employment of persons or in the provision of services under this Agreement on the basis of any legally protected classification, including race, color, national origin, ancestry, sex or religion of such person. 4 EXHIBIT 1
420
(Rev. 10.30.18; Mod Ϭϱ͘Ϭϴ͘ϮϯZD͖DŽĚϬϯ͘Ϯϳ͘ϮϰZDͿ

17. Licenses, Certifications and Permits . Prior to the City’s execution of this Agreement and prior to the Contractor’s engaging in any operation or activity set forth in this Agreement, Contractor shall obtain a City of Stockton business license, which must be kept in effect during the term of this Agreement. Contractor covenants that it has obtained all certificates, licenses, permits and the like required to perform the services under this Agreement. Such licenses, certificates and permits shall be maintained in full force and effect during the term of this Agreement.

18. Records and Audits . Contractor shall maintain all records regarding this Agreement and the services performed for a pe riod of three (3) years from the date that final payment is made. At any time during normal business hours, the records shall be made available to the City to inspect and audi t. To the extent Contractor renders services on a time and materials basis, Contractor shall maintain complete and accurate accounting records, in a form prescribed by City or, if not prescribed by City, in accordance with generally accepted accounting principles, such records to include, but not be limited to, payroll records, attendance cards, time sheets, and job summaries.

19. Confidentiality . Contractor shall exercise reasonable precautions to prevent the unauthorized disclosure and use of City reports, information or conclusions.

20. Conflicts of Interest . Contractor covenants that other than this Agreement, Contractor has no financial interest with any official, employee or other representative of the City. Contractor and its principals do not have any financial interest in real property, sources of income or investment that would be affected in any manner of degree by the performance of Contractor’s services under this Agreement. If such an interest arises, Contractor shall immediately notify the City.

21. Waiver . In the event either City or Contractor at any time waive any breach of this Agreement by the other, such waiver shall not constitute a waiver of any other or succeeding breach of this Agreement, whether of the same or of any other covenant, condition or obligation. No payment, partial payment, acceptance, or partial acceptance by City shall operate as a waiver on the part of City of any of its rights under this Agreement.

22. Governing Law . California law shall govern any legal action pursuant to this Agreement with venue for all claims in the Superior Court of the County of San Joaquin, Stockton Branch or, where applicable, in the Federal District Court of California, Eastern District, Sacramento Division.

23. No Personal Liability . No official or employee of City shall be personally liable to Contractor in the event of any default or breach by the City or for any amount due Contractor.
5 EXHIBIT 1
421
(Rev. 10.30.18; Mod Ϭϱ͘Ϭϴ͘ϮϯZD͖DŽĚϬϯ͘Ϯϳ͘ϮϰZDͿ

24. Severability. If any portion of this Agreement or application thereof to any person or circumstance shall be declared invalid by a court of competent jurisdiction or if it is found in contravention of any federal, state or city statue, ordinance or regulation the remaining provisions of this Agreement or the application thereof shall not be invalidated thereby and shall remain in full force and effect to the extent that the provisions of this Agreement are severable.

25. Non-Discrimination. During the performance of this Agreement, Contractor and its officers, employees, agents, r epresentatives or subcontra ctors shall not unlawfully discriminate in violation of any federal, state, or local law, rule or regulation against any employee, applicant for employ ment or person receiving se rvices under this Agreement because of race, religion, color, national origin, ancestry, physical or mental disability, medical condition (including genetic characteristics), marital status, age, political affiliation, gender identity, gender expression, sex or sexual orientation, family and medical care leave, pregnancy leave, or disability leave. Contractor and its officers, employees, agents, representative or subcon tractors shall comply with all applicable Federal, State and local laws and regulations related to non-discrimination and equal opportunity, including without limitation the City’s nondiscrimination policy; the Fair Employment and Housing Act (Government Code sections 12990 (et seq.); California Labor Code sections 1101, 1102 and 1102.1; the Federal Civil Rights Act of 1964 (P.L. 88-352), as amended; and all applicable regulations promulgated in the California Code of Regulation or Code of Federal Regulations. Title VI of the Civil Rights Act of 1964 requires that “no person in the United States shall, on the grounds of race, color, or national origin be excluded from participation in, be denied the benefits of, or be subject ed to discrimination under any program or activity receiving federal financial

assistance.” (42 USC Section 2000d).
http://www.dol.gov/oasam/regs/statutes/titlevi.htm. The City requires compliance with the requirements of Title VI in all of its programs and activities regardless of funding source.

26. Force Majeure . Neither party shall be responsible for delays or failures in performance resulting from acts of God, acts of civil or military authority, terrorism, fire, flood, strikes, war, epidemics, pandemics, shortage of power or other acts or causes reasonably beyond the control of that party. The party experiencing the force majeure event agrees to give the other party notice promptly following the occurrence of a force majeure event, and to use diligent efforts to re-commence performance as promptly as commercially practicable.

27. Taxes and Charges. Contractor shall be responsible for payment of all taxes, fees, contributions or charges applicable to the conduct of the Contractor’s business.

28. Cumulative Rights. Any specific right or remedy provided in this Agreement will not be exclusive but will be cumulative of all other rights and remedies to which may be legally entitled.
6 EXHIBIT 1
422
(Rev. 10.30.18; Mod Ϭϱ͘Ϭϴ͘ϮϯZD͖DŽĚϬϯ͘Ϯϳ͘ϮϰZDͿ

29. Advice of Attorney. Each party warrants and represents that in executing this Agreement, it has received independent legal advice from its attorneys or the opportunity to seek such advice.

30. Heading Not Controlling. Headings used in this Agreement are for reference purposes only and shall not be considered in construing this Agreement.

31. Entire Agreement, Integration, and Modification.

31.1 This Agreement represents the entire integrated agreement between Contractor and the City; supersedes all prior negotiations, representations, or agreements, either written or oral between the parties and may be amended only by a written Amendment signed by the Contractor and City Manager.

31.2 All Exhibits to this Agreement and this Agreement are intended to be construed as a single document.

32. Counterparts. This Agreement may be executed in one or more counterparts, each of which shall be deemed an original. All counterparts shall be construed together and shall constitute one agreement.

33. Authority. The individual(s) executing this Agreement represent and warrant that they have the legal capacity and authority to do so on behalf of their respective legal entities.
7 EXHIBIT 1
423
1 (Rev. 07.12.22)

EXHIBIT D

PROFESSIONAL SERVICES SPECIAL TERMS AND CONDITIONS

1. Definitions. The following words and phrases have the following meanings for purposes of this Agreement:

1.1 "Services" means, collectively, the services, duties and responsibilities described in Exhibit A of this Agreement and any and all work necessary to complete them or carry them out fully and to the standard of performance required in this Agreement.

1.2 “Deliverable” means q uantifiable goods or services that will be provided upon completion of a project. A deliverable is any tangible material, work or thing delivered by one party to the other, including associated technical documentation. A deliverable can be tangible or intangible parts of the development process, and often are specified functions or characteristics of the project.

2. General. The following terms and conditions are applicable for the Professional Services only. The special conditions shall be read in conjunction with the Standard Agreement, General Terms and Conditions (“GTC”) Exhibit C, and all other Exhibits identified in the Standard Agreement.

2.1 Where any portion of the GTC is in conflict to or at variance with any provisions of the Special Conditions of the Agreement, then unless a different intention stated, the provision(s) of the Special Conditions of the Agreement shall be deemed to override the provision(s) of GTC only to the extent that such conflict or variations in the Special Conditions of the Agreement are not possible of being reconciled with the provisions of the GTC.

2.2 In the case of modification of a part or provision of the GTC, the unaltered part or provision, or both shall remain in effect. The Special Conditions shall relate to a particular project and be peculiar to that project but shall not weaken the character or intent of the GTC.

3. Time for Performance.

3.1 C
ontractor shall perform the services according to the schedule contained in Exhibit F.

3.2 Timeliness of Performance i) Contractor shall provide the Services, and Deliverables within the term and within the time limits required under this Agreement, pursuant to the provisions of Exhibit A and Exhibit F. ii) Neither Contractor nor Contractor’s agents, employees nor subcontractors are entitled to any damages from the City, nor is any party entitled to be reimbursed by the City, for damages, charges or other EXHIBIT 1
424
2 (Rev. 07.12.22)
losses or expenses incurred by Contractor by reason of delays or hindrances in the performance of the Services, whether or not caused by the City.

4. Standard of Performance

In addition to Exhibit C, Section 4 and 17, Contractor agrees as follows:

4.1 Contractor’s Services shall be performed in accordance with generally accepted professional practices and principles and in a manner consistent with the level of care and skill ordinarily exercised by members of Contractor’s profession currently practicing under similar conditions. Contractor shall comply with the profession’s standard of performance, applicable laws, regulations, and industry standards. By delivery of completed work, Contractor certifies that the work conforms to the requirements of this Agreement and all applicable federal, state and local laws. If Contractor is retained to perform services requiring a license, certification, registration or other similar requirement under California law, Contractor shall maintain that license, certification, registration or other similar requirement throughout the term of this Agreement.

4.2 Contractor acknowledges that it is entrusted with or has access to valuable and confidential information and records of the City and with respect to that information, Contractor agrees to be held to the standard of care of a fiduciary. Contractor shall assure that all services that require the exerci se of professional skills or judgment are accomplished by professionals qualified and competent in the applicable discipline and appropriately licensed, if required by law. Contractor must provide copies of any such licenses. Contractor remains responsible for the professional and technical accuracy of all Services or Deliverables furnished, whether by Contractor or its subcontractors or others on its behalf. All Deliverables must be prepared in a form and content satisfactory to the Using Agency and delivered in a timely manner consistent with the requirements of this Agreement.

4.3 If Contractor fails to comply with the foregoing standards, Contractor must perform again, at its own expense, all Services required to be re-performed as a direct or indirect result of that failure. Any review, approval, acceptance or payment for any of the Services by the City does not relieve Contract or of its responsibility for the professional skill and care and technical accura cy of its Services and Deliverables. This provision in no way limits the City’s rights against Contractor either under this Agreement, at law or in equity.

5. Compensation

5.1 In addition to Section 3 Compensation in Exhibit C – GTC, the Contractor shall be compensated for the services provided under this Agreement as follows:

5.1.1 Contractor shall be compensated for services rendered and accepted under this Agreement and shall be paid monthly, in arrears on a not to exceed EXHIBIT 1
425
3 (Rev. 07.12.22)
basis, based upon the rates set forth in Exhibit E attached hereto and made a part of this Agreement. Contractor may vary the compensation for each task in Exhibit E provided that the total project compensation listed in Exhibit E and the Standard Agreement is not exceeded.

6. Personnel

6.1 N
one of the work or services covered by this Agreement shall be subcontracted without the prior written approval of the City. Any work or services subcontracted hereunder shall be specified by written agreement and shall be subject to each provision of this Agreement. Contractor shall provide subcontractor a copy of this fully executed Agreement.

6.2 Contractor agrees to assign only competent personnel according to the reasonable and customary standards of training and experience in the relevant field to perform services under this Agreement. Failure to assign such competent personnel shall constitute grounds for termination of this Agreement. The payment made to Contractor pursuant to this Agreement shall be the full and complete compensation to which Contractor and Contractor’s officers, employees, agents, and subcontractors are entitled for performance of any work under this Agreement. Neither Contractor nor Contractor’s officers or employees are entitled to any salary or wages, or retirement, health, leave or other fringe benefits applicable to employees of the City. The City will not make any federal or state tax withholdings on behalf of Contractor. The City shall not be required to pay any workers' compensation insurance on behalf of Contractor. Contractor shall pay, when and as due, any and all taxes incurred as a result of Contractor’s compensation hereunder, including estimated taxes, and shall provide City with proof of such payments upon request.

6.3 Key Personnel: Because of the special skills required to satisfy the requirements of this Agreement, Contractor shall not reassign or replace key personnel without the written consent of the City, which consent the City will not unreasonably withhold. "key personnel" means those job titles and the persons assigned to those positions in accordance with the provisions of this Agreement. The City may at any time in writing notify Contractor that the City will no longer accept performance of Services under this Agreement by one or more Key Personnel listed. Upon that notice Contractor shall immediately suspend the services of the key person or persons and must replace him or them in accordance with the terms of this Agreement. A list of key personnel is found in Exhibit A, Scope of Services.

7. Reports and Information
Contractor shall at such times and in such forms as the City may require furnish the City such periodic reports as it may request pertaining to the work or services undertaken pursuant to this Agreement, the costs and obligations incurred or to be incurred in connection therewith, and any other matters are covered by this Agreement as specified in Exhibit A and Exhibit E.

EXHIBIT 1
426
4 (Rev. 07.12.22)

8. Findings Confidential
All of the reports, information, data, et cetera, prepared or assembled by the Contractor under this Agreement are confidential and the Contractor agrees that they shall not be made available to any individual or organization without the prior written approval of the City. Contractor shall not be required under the provisions of this paragraph to keep confidential any data or information which is or becomes publicly available, is required by applicable law or by proper legal or governmental authority, is already rightfully in the Contractor’s possession without obligation of confidentiality, is independently developed by Contractor outside the scope of this Agreement or is rightfully obtained from third parties. Contractor shall give City prompt notice of any such legal or governmental demand and reasonably cooperate with City in any effort to seek a protective order or otherwise to contest such required disclosure.

9. Copyright
No materials, including but not limited to reports, maps, or documents produced as a result of this Agreement, in whole or in part, shall be available to Contractor for copyright purposes. Any such materials produced as a result of this Agreement that might be subject to copyright shall be the property of the City and all such rights shall belong to the City, and the City shall be sole and exclusive entity who may exercise such rights.

10. Deliverables
Contractor shall prepare or provide to the City various Deliverables. "Deliverables" include work product, such as written reviews, recommendations, reports and analyses, produced by Contractor for the City. The City may reject Deliverables that do not include relevant information or data, or do not include all documents or other materials specified in this Agreement or reasonably necessary for the purpose for which the City made this Agreement or for which the City intends to use the Deliverables. If the City determines that Contractor has failed to comply with the foregoing standards, it has 30 days from the discovery to notify Contractor of its failure. If Contractor does not correct the failure, or if it is possible to do so, within 30 days after receipt of notice from the City specifying the failure, then the City, by written notice, may treat the failure as a default of this Agreement.

Partial or incomplete Deliverables may be accepted for review only when required for a specific and well-defined purpose and when consented to in advance by the City. Such Deliverables will not be considered as satisfying the requirements of this Agreement and partial or incomplete Deliverables in no way relieve Contractor of its commitments under this Agreement.

11. Applicable Laws
Deliverables must conform with all applicable federal, state, and local laws. Such conformity includes compliance with federal sanctions, and Contractor certifies that it has not and will not engage in prohibited transactions with sanctioned persons or entities.

EXHIBIT 1
427
1 (Rev. 10.30.18)

EXHIBIT E

COMPENSATION SCHEDULE
The Contractor shall be compensated for the services identified in Exhibit A, Exhibit C, and Exhibit D to this Agreement as follows:

1. Project Price

1.1 The maximum the Contractor shall be paid on this Agreement is $ 11,483,248 (hereafter the “not to exceed” amount). The “not to exceed” amount
includes all payments to be made pursuant to this Agreement, including City approved
reimbursable expenses, if any. Nothing in this Agreement requires the City to pay for
work that does not meet the Standard of Performance identified in Exhibit D section 4 or other requirements of this Agreement.

1.2 Stan
dard Reimbursable Items: Only the reimbursable items identified in Exhibit A, C, and D (Compensation), shall be compensated to the Contractor.

Reimbursa
ble expenses will be reimbursed without mar kup. Fees plus reimbursable expenses s
hall not exceed the amount set forth in section 1.1 of this Exhibit and a copy of
the original invoice for the items listed in i, ii or iii below shall be attached to the invoice submitted to the City for reimbursement. Payments shall be based upon work documents submi
tted by the Contractor to the City and accepted by the City as being satisfactory to City’s needs. The
City shall not pay a markup on any of the items listed in i, ii or iii.

Additionally, items such a telephone, fax, postage or freight are already included in the billable hourly rate. Contractor shall be reimbursed the direct expenses, which are the actual cost of the following items that are reasonable, necessary and actually incurred, by the C
ontractor in connection with the services:
i. Expenses, fees or charges for printing, reproduction or binding of documents at actual costs with no markup added to the actual cost. ii. Any filing fees, permit fees, or other fees paid or advanced by the Contractor at actual costs with no markup added to the actual cost. iii. Travel expenses shall be reimbu rsed in accordance with the City’s travel policy, which is incorporated herein by reference.

Reimbursement shall be made at actual costs with no markup added to the actual cost.

1.3 The Contractor shall be entitled to receive payments for its work performed pursuant to the Agreement. The City will pay Contractor based on invoices for acceptable work performed and approved until the “not to exceed” amount is reached.

Thereafter, Contractor must complete services based on the Agreement without additional compensation unless there is a material change to the Statement of Work and Scope by a written Amendment.

EXHIBIT 1
428
2 (Rev. 10.30.18)

1.4 If work is completed before the “not to exceed” amount is reached, the Contractor’s compensation will be based on the Contractor’s invoices previously submitted for acceptable work performed and approved.

2. Task Price . Bel ow is the price for the services and reimbursable expenses as described in Exhibit A of this Agreement.

ATTACHM
ENT A – Revised Appendix I; Proponent’s Fee Schedule

5. Invoice to Address. Each invoice submitted shall identify the specific task(s) listed in Exhibit A and this Exhibit, and the completed work product/deliverable for the agreed upon price listed in this Exhibit. Invoices shall be submitted to the below address:

[email protected]
EXHIBIT 1
429
Item
No. Item of Work Unit Qty Unit Price Total Price
-
1 Schedule, predesign evaluation & recommendation LS 1 127,221 127,221 2 30% design and permitting started LS 1 511,182 511,182 3 60% design completion LS 1 329,626 329,626 4 90% design completion LS 1 329,626 329,626 5 100% design completion LS 1 100,000 100,000 6 Permitting obtained LS 1 22,798 22,798
7 Initial test & final completion acceptance LS 1 25,000 25,000 8 Cost of bond LS 1 82,412 82,412
1,527,865
-
1 PM/Coordination/Scheduling/WA/QC/Permit Coordination LS 1 630,132 630,132 630,132
-
1 Mobilization and staging area and insurance LS 1 403,564 403,564 2 Survey LS 1 60,000 60,000
3 Utility locations LS 1 20,000 20,000
4 Fence LS 1 908,125 908,125
5 Wrought Iron Gate and Control LS 1 70,700 70,700 6 SWPPP LS 1 50,000 50,000
7 Clearing and grubbing LS 1 150,000 150,000 8 Mass excavation LS 1 3,070,000 3,070,000
9 24" overflow pipe LS 1 500,000 500,000
10 36" and 30" steel pipe LS 1 1,330,000 1,330,000 11 16 Decant Line/Flow Meter/Valve/Conc LS 1 584,390 584,390 12 Valves and Magnetic Flow Meter LS 1 292,000 292,000 13 Concrete LS 1 600,000 600,000
14 Slope protection at weirs LS 1 200,000 200,000 15 Visitor's viewing and information LS 1 125,000 125,000 16 Landscaping at visitor's area LS 1 40,000 40,000 17 Electrical and controls LS 1 434,472 434,472 18 500HP VFD/Harmonic Filter/Enclosure LS 1 437,000 437,000 18 Testing, startup, and training LS 1 50,000 50,000 9,325,251
11,483,248
㻰㻱㻿㻵㻳㻺㻌㻮㼁㻵㻸㻰㻌㻿㻱㻾㼂㻵㻯㻱㻿㻌㻲㻻㻾㻌㼀㻴㻱㻌㻰㻱㻸㼀㻭㻌㼃㻭㼀㻱㻾㻌㼀㻾㻱㻭㼀㻹㻱㻺㼀㻌㻼㻸㻭㻺㼀㻌㻳㻾㻻㼁㻺㻰㼃㻭㼀㻱㻾㻌 㻾㻱㻯㻴㻭㻾㻳㻱㻌㻮㻭㻿㻵㻺

TOTAL COST

CITY OF STOCKTON

ENGINEERING

CONSTRUCTION MANAGEMENT

CONSTRUCTION

TOTAL ENGINEERING PRICE

TOTAL CONSTRUCTION PRICE

TOTAL CONSTRUCTION MANAGEMENT PRICE
Submitted 8/8/2024
EXHIBIT 1
430
1 (Rev, 10.27.22)

EXHIBIT F

TIMELINE

1. Contractor shall complete the requested services identified in Exhibit A as follows:

1.1 TIMELINE FOR COMPLETION OF WORK
See Schedul
e (Attachment A).

The dates listed in the Schedule will shift with respect to the actual date the City issues a Notice to Proceed letter to the contractor.

EXHIBIT 1
431
Act
ID
Description Start Compl 2024
APR
2025
MAY
2026
JUN
2027

JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN

DESIGN - DESIGN AND REVIEW
1000 SUBMIT D/B PROPOSAL 0 04APR24
1010 CITY OF STOCKTON EVALUATE PROPOSALS 20 04APR24 01MAY24 1020 CONTRACT NEGOTIATIONS-COUNCIL APPR 0 02MAY24 30SEP24 1030 NOTICE TO PROCEED - CONTRACT 0 01OCT24
2000 Design Validation, VE and Workshop 22 01OCT24 30OCT24 2010 30% Design Completion 45 31OCT24 03JAN25
2020 Visitors Center Parking / Landscape Plan 45 31OCT24 03JAN25 2030 Client Review 30% Design 10 06JAN25 17JAN25
2040 60% Design Completion 55 20JAN25 04APR25
2050 Visitors Parking Construction Documents 55 20JAN25 04APR25 2060 Client Review 60% Design 10 07APR25 18APR25
2070 90% Design Completion 20 21APR25 16MAY25
2080 Client Review 90% Design 5 19MAY25 23MAY25
2090 100% Design Completion 30 27MAY25 08JUL25

PERMIT - CEQA PERMMITTING
3010 Biological Resources Assessment 70 31OCT24 07FEB25 3020 Cultural Resources Assessment 70 31OCT24 07FEB25
3000 Air Quality/Greenhouse Gas Emissions Analysis 31 06JAN25 17FEB25 3030 Noise Analysis and Vibration 21 06JAN25 03FEB25
3040 Administrative Draft IS/MND 42 06JAN25 04MAR25
3050 Public Review 33 05MAR25 18APR25
3060 Final IS/MND 10 21APR25 02MAY25
3070 Draft and Final NOI, NOC 10 05MAY25 16MAY25
3080 Draft and Final NOD 20 19MAY25 16JUN25

CONSTR - CONSTRUCTION
1510 SURVEY / LOCATE UTILITIES 10 20JAN25 31JAN25
1300 PROCURE STEEL PIPE - LONG LEAD TIME 4 21APR25 05NOV25 1340 PROCURE VALVES - LONG LEAD TIME 8 21APR25 06JAN26
1350 PROCURE FLOW METERS 4 21APR25 05NOV25
1360 PROCURE 500HP VFD 4 21APR25 01APR26
1540 START MASS EXCAVATION 20 19MAY25 16JUN25
1550 INSTALL 24" OVERFLOW PIPE 20 17JUN25 15JUL25
1560 COMPLETE MASS EXCAVATION 80 17JUN25 08OCT25
1570 INSTALL PERCOLATION WELLS 40 09OCT25 05DEC25
1610 CONST VISITORS VIEWING AREA/SIGNS/LS 2 09OCT25 01APR26 8500 CONSTRUCT DECANT PIPE BYPASS 60 06NOV25 03FEB26
1530 TIE-IN 54" PIPE WITH VALVES (Dec thru May) 10 07JAN26 20JAN26 1580 INSTALL 36" & 30" PIPE AND VALVES 60 07JAN26 01APR26 1590 CONSTRUCT SLAB ON GRADE CONCRETE 40 02APR26 28MAY26 1620 ELECTRICAL & CONTROLS 60 02APR26 25JUN26
1630 FINISH GRADING & NESTED WELLS 30 02APR26 13MAY26
8510 REPLACE SOFT START W/500HP VFD 60 02APR26 25JUN26
1520 INSTALL PERIMETER FENCING 30 14MAY26 25JUN26
1600 INSTALL RIP-RAP @ WEIRS 30 29MAY26 10JUL26
8000 INITIAL ACCEPTANCE TEST - 20 13JUL26 07AUG26
8010 FINAL ACCEPTANCE TEST 10 10AUG26 21AUG26
1599 FINAL PUNCHLIST ITEMS / MOVE-OFF 21 24AUG26 22SEP26 9888 SUBSTANTIAL COMPLETION 0 31AUG26 *
9999 FINAL COMPLETION 0 30SEP26 *

SUBMIT D/B PROPOSAL

CITY OF STOCKTON EVALUATE PROPOSALS

CONTRACT NEGOTIATIONS-COUNCIL APPR

NOTICE TO PROCEED - CONTRACT EXECUTION
Design Validation, VE and Workshop
30% Design Completion
Visitors Center Parking / Landscape Plan
Client Review 30% Design
60% Design Completion
Visitors Parking Construction Documents
Client Review 60% Design
90% Design Completion
Client Review 90% Design
100% Design Completion
Biological Resources Assessment
Cultural Resources Assessment
Air Quality/Greenhouse Gas Emissions Analysis
Noise Analysis and Vibration
Administrative Draft IS/MND
Public Review
Final IS/MND
Draft and Final NOI, NOC
Draft and Final NOD

SURVEY / LOCATE UTILITIES

PROCURE STEEL PIPE - LONG LEAD TIME

PROCURE VALVES - LONG LEAD TIME

PROCURE FLOW METERS
PROCURE 500HP VFD

START MASS EXCAVATION
INSTALL 24" OVERFLOW PIPE

COMPLETE MASS EXCAVATION

INSTALL PERCOLATION WELLS

CONST VISITORS VIEWING AREA/SIGNS/LS

CONSTRUCT DECANT PIPE BYPASS
TIE-IN 54" PIPE WITH VALVES (Dec thru May)
INSTALL 36" & 30" PIPE AND VALVES

CONSTRUCT SLAB ON GRADE CONCRETE

ELECTRICAL & CONTROLS

FINISH GRADING & NESTED WELLS
REPLACE SOFT START W/500HP VFD

INSTALL PERIMETER FENCING
INSTALL RIP-RAP @ WEIRS

INITIAL ACCEPTANCE TEST - START

FINAL ACCEPTANCE TEST

FINAL PUNCHLIST ITEMS /

SUBSTANTIAL COMPLETION

FINAL COMPLETION
Start date 04APR24
Finish date 30SEP26
© Primavera Systems, Inc.

Delta Groundwater Recharge Basin
Gateway Pacific / Nexgen D-B
Date Revision Checked Approved
04APR24 Submit Proposal DB new
22JUL24 R1-Scope Changes rec

ATTACHMENT A
EXHIBIT 1
432
City of Stockton
Legislation Text
File #: 24-0947, Version: 1
ADOPTION OF PROPOSED REDLINE CHANGES TO CHAPTER 4.06 OF THE COUNCIL POLICY MANUAL

RECOMMENDATION
Staff recommends that the City Council adopt by resolution the proposed redline changes to Chapter

4.06, Section 4.06.010 of the Council Policy Manual.

Summary
On August 28, 2024, the Council Legislation/Environmental Committee reviewed, provided direction, and forwarded a recommendation that Council adopt changes to Chapter 4.06.010(2) of the Council Policy Manual regarding the use of electronic devices during meetings. Those changes are now presented for the City Council’s consideration.

DISCUSSION
Background
State law does not prohibit the use of electronic communication devices, such as cell phones, tablets, or laptops, during a public meeting. Yet, such use creates the potential for government transparency and open communication issues.

The Brown Act’s open meeting law requires that matters within the City's jurisdiction be discussed by a majority of the members of a legislative body in a manner that provides access to the public.

Although the Brown Act does not prohibit the sending of texts and emails during meetings, sending such communications to a majority of the body creates a risk for potential violation. Additionally, the concept of fair hearings is jeopardized when officials use electronic devices during a hearing because the decisions must be based on evidence “in the record.” Even if the use of electronic devices during the meeting is unrelated to any given hearing or other discussion item, it can give the appearance that the body and/or its individual members are receiving evidence unknown to the public. Further, Councilmembers have a general duty to avoid the appearance of impropriety or inattentiveness.

As technology became more prevalent, entities recognized the need to address the use of electronic devices during public meetings and did so in a variety of ways including outright bans, discouraging such use, and requiring disclosure during the meeting in real time.

Regardless of the approach, it was clear that in this new age of technology, public entities and the officials who serve, need to be mindful of the implications of using electronic devices during public City of Stockton Printed on 9/5/2024Page 1 of 3
powered by Legistar™
433
File #: 24-0947, Version: 1
meetings.

In 2013, on recommendation from the Council Legislation/Environmental Committee, the Council adopted a policy prohibiting the use of all electronic communication devices such as cell phones, ipads, and laptops, during Council meetings, except to access agenda materials (Resolution 2013-12 -17-1213).

In making its recommendation, the Committee noted that: 1) Electronic communication devices can be used to receive and send messages, so there is a concern that a council member could receive information about an item then under discussion to which the rest of the Council would not be privy; and 2) If the public observes a council member looking at his/her cell phone/other electronic device during a meeting, there is a perception that the council member is not fully engaged in the matter then under discussion.

Although the Committee recognized that messages might also be received on iPads, it concluded that the benefit of using such devices to access agenda materials (and thereby eliminating the need to print agenda materials) outweighed the potential for abuse. The use of electronic devices during closed session was not addressed and there have not been any amendments to this policy section since its inception.

In December 2023, the Legislation/Environmental Committee reviewed and discussed revisions to the entire council policy manual. Staff was directed to revise Section 4.06.010(2) regarding the use of electronic devices. Specifically, staff was asked to:
· Include language to allow limited flexibility in open session. · Prohibit the use of electronic devices in closed session.

In June 2024, the Grand Jury issued a report which included a recommendation that the City amend its Closed Session policies and procedures to prohibit the use of electronic devices during closed session.

Present Situation
At the August 28, 2024, Council Legislation/Environmental Committee meeting, proposed changes to Chapter 4.06, Section 4.06.010(2) of the Council Policy Manual were discussed by the Committee and a recommendation forwarded to Council.

Currently, Council Policy 4.06.010(2) reads as follows:
“USE OF ELECTRONIC COMMUNICATION DEVICES
“The Council's use of electronic communication devices, such as cell phones, during a City Council meeting may lead to the public's perception that a Councilmember is not paying attention to the subject matter at hand or that a Councilmember is receiving information relative to the subject matter at hand that other Councilmembers and members of the public are not receiving, either one of which is inimical to good government and transparency. Therefore, the Council's use of electronic communication devices (including cell phones), other than for the purpose of accessing City of Stockton Printed on 9/5/2024Page 2 of 3
powered by Legistar™
434
File #: 24-0947, Version: 1
communication devices (including cell phones), other than for the purpose of accessing agenda materials that are on a Councilmember's tablet or laptop computer, is prohibited during Council meetings.”
Attachment A includes amendments responsive to the Committee’s direction and the Grand Jury recommendation noted above.

Conclusion
Staff recommends that the City Council adopt by resolution the proposed redline changes to Chapter Policy 4.06, Section 4.06.010(2) of the Council Policy Manual regarding the use of electronic devices.

Attachment A- Council Policy 4.06 (Redline)
City of Stockton Printed on 9/5/2024Page 3 of 3
powered by Legistar™
435
Downloaded from https://ecode360.com/ST5019 on 2024-08-15

ATTACHMENT A

CHAPTER 4.06

ROLES AND RULES
§ 4.06.010. Policy.
1) ROSENBERG'S RULES OF ORDER
The City Council adopts Rosenberg's Rules of Order unless provided otherwise in this Policy. 2) USE OF ELECTRONIC COMMUNICATION DEVICES
The Council's use of electronic communication devices , such as cell phones, during a City Council meeting, may lead to the public's percepti on that a Councilmember is not paying attention to the subject matter at hand or that a Councilmember is receiving information relative to the subject matter at hand that other Councilme mbers and members of the public are not receiving, either one of which is inimical to good government and transparency.

Electronic Communication Device s means products designed to electronically process, transmit, or store information and includes but is not limited to devices such as cell phones, smart watches, ipads, tablets, and laptop computers.

Therefore, tThe Council's use of electr onic communication devices (including cell phones), shall be restricted as follows:
a. Councilmembers are prohibited from usi ng electronic devices during a public meeting except other than for the purpose of when accessing agenda materials that are on a Councilmember's city issued ipad, tablet, or laptop computer , is prohibited during Council meetings.
b. Councilmembers are not prohibited from co mmunicating with family members or family care givers, on urgent personal matters or from communicating with outside parties on business related matters that do not address and are not related to City business. A councilmember wishing to respond to such a message during a meeting shall do so during a recess or shall excuse themselves from the meeting to place the return call or text in a manner that does not disrupt the meeting. a.c. Councilmembers are prohibited from using electronic devices during closed session.

No electronic devices shall be allowed in the location where closed session is held.

The Presiding Officer shall ensure that all members comply with this prohibition. 3) DUTIES OF PRESIDING OFFICERS
A) The Presiding Officer—Electi on and Duties. The presiding officer of the Council shall be the Mayor who shall be elected as provided in the Stockton City Charter. The Mayor shall preserve strict order and decorum at all meetings, announce the decisions of the Council and decide all questions of order consistent with Rosenberg's Rules of Order subject, however, to an app eal to the Council, in which ev ent a two-thirds vote of the Council shall govern and conclusively determine such questions of order.

B) Call to Order—Presiding Officer. The Mayor or, in his or her absence, the Vice Mayor shall take the chair precisely at the hour appointed for the meeting, and shall immediately call the Council to order. In the absence of the Mayor or Vice Mayor, the City Clerk, or his or her deputy, shall call the Council to order, whereupon a temporary chairperson 436
Downloaded from https://ecode360.com/ST5019 on 2024-08-15

ATTACHMENT A

shall be elected by the members of the Council present. Upon the arrival of the Mayor or Vice Mayor, the temporary chairperson shall immediately relinquish the chair upon the conclusion of the business immediately before the Council. 4) RULES OF DEBATE
A) Except as provided below, the City Council will follow the latest version of Rosenberg's Rules of Order.

B) Presiding Officer May Debate and Vote. The Mayor or Vice Mayor or such other member of the Council as may be presiding may move, second, and debate from the Chair, subject only to such limitations of debate as are by these rules imposed on all members and shall not be deprived of a ny of these rights and privileges of a Councilmember by reason of acting as the presiding officer.

C) Getting the Floor—Improper References. Every member desiring to speak shall address 437
Downloaded from https://ecode360.com/ST5019 on 2024-08-15

ATTACHMENT A

the Chair, and, upon recognition by the presiding officer, shall confine all remarks to the question under debate, avoiding all personalities and indecorous language.

D) Interruptions. A member, once recognized, shall not be interrupted when speaking unless it is to call said member to order, or as herein otherwise provided. If a member, while speaking, be called to order, said member shall cease speaking until the question of order is determined, and, if in order, he/she shall be permitted to proceed.

E) Time Limit. Every member, on ce recognized, shall be limited in their debate to five minutes and shall, upon expiration of said time, relinquish the floor.

F) Privilege of Closing Debate. The Council member making the motion shall have the privilege of closing the debate.

G) Remarks of Councilmembers—When Ente red in Minutes. A Councilmember may request, through the presiding offi cer, the privilege of having a written abstract of said member's statement on any subject under c onsideration by the Council entered in the minutes. If the Council consents thereto, such statement shall be entered in the minutes. 5) ADDRESSING THE COUNCIL
Any person desiring to address the Council shall fi rst secure the permission of the presiding officer to do so; provided, however, that under the following headings of business, unless the presiding officer rules ot herwise, any qualified and interested person sh all have the right to address the Council upon obtaining recognition by the presiding officer.

A) Written Communications. Interested parties or their authorized representatives may address the Council by written communicati ons in regard to matters then under discussion.
i) Material that is submitted to the City Clerk one business day before the regular meeting, special meeting or workshop will be transmitted to the City Council prior to the meeting or workshop and made available to the public. ii) Material that is submitted to the City Clerk on the day of the meeting or workshop will be copied and placed on the dais pr ior to the meeting or workshop and made available to the public.
iii) Material that is presented at a meeting or workshop will be, to the extent practical, scanned and distributed to the City Council and made available to the public.

B) Oral Communications. Persons may address the Council by oral communications on any matter concerning the City's business, or any matter over which the Council has control.

Speakers may submit "Request to Speak" cards to the City Clerk who shall number them in the order in which they are received. The presiding officer shall call upon such persons to speak in such order, unless he or she determin
es that a different order is necessary to
facilitate the conduct of the meeting.

C) Visual Presentations. Members of the public wishing to use electronic media when addressing Council must provide the electronic file to staf f for screening no later than noon six days prior to the meeting. For example, for the Tuesday meeting, the electronic 438
Downloaded from https://ecode360.com/ST5019 on 2024-08-15

ATTACHMENT A

file must be provided to City staff by noon on the preceding Wednesday.

Screening ensures that the material is in a format capable of broadcast or presentation over the audiovisual system, assures that the material is germane to the agenda item and assures that the material is legally appropriate for broadcast over the audiovisual system and cable. No visual materials may be disp layed through the audiovi sual system that City staff has not screened.
i) Visual materials include any visual or textual items that are to be displayed through the audiovisual system irrespective of their specific format or media. This includes, without limitation, photographs, audio and video presentations, charts, computer presentations, computer screen images, pos ters and flyers, whether in physical or electronic format.
ii) The name of the person or the name of organization presenting the visual material must be included in the footer on every slide. If the presenter is representing a party to an appeal, the status of the party must also be included in the footer. iii) Visual Presentations during Public Comme nts are limited to five minutes, which includes the time necessary for oral remarks and all visual presentation.

Visual materials do not include items held or worn by a speaker at the podium or worn by a member of the audience, even though such items may be televised through the cameras that view the audience and the dais.

D) Public Hearings and Protes ts, Etc. Persons may addres s the Council by reading of protests, petitions, or communications relating to zoning, sewer and street proceedings, hearings on protests, appeals and petitions, or similar matters, in regard to matters then under consideration.

E) Addressing the Council After Motion is Made. Afte r a motion is made by the Council, no person shall address the Council without first securing the permission of the Council to do so.

F) Manner of Addressing Council— Time Limit. Persons addressing the Council shall step up to the podium and may give their name and address in an audible tone of voice. i) All remarks shall be addressed to the Council as a body and not to any member. No person, other than the Council and the pers on having the floor shall enter into any discussion, either directly or through a member of the C ouncil, without the permission of the presiding officer. No question shall be asked of a Councilmember except through the presiding officer.
ii) All comments, including visu al presentations, presented to the Council under any agenda item shall be limited to a maximum of five minutes but the presiding officer may waive this limitation when deemed necessary to accommodate more fully a citizen's request to be heard.
6) MIS CELLANEOUS
439
City of Stockton, CA
§ 4.06.010 § 4.06.070
Downloaded from https://ecode360.com/ST5019 on 2024-08-15

All reports and resolutions shall be filed with the City Clerk and entered on the minutes. § 4.06.020. Procedure.
1) Except as provided below, the City Council will follow the latest version of Rosenberg's Rules of Order.
2) ROLL CALL
Before proceeding with the business of the Council, the City Clerk or his or her deputy shall call the roll of the members, and the names of those present shall be entered in the minutes. 3) QUORUM
A majority of all the members elected to the Council shall constitute a quorum at any regular or special meeting or study session of the Council.
4) ORDER OF BUSINESS
All meetings of the Council shall be open to the public, except for closed sessions as permitted by law. The Council shall provide by resolution the order of business for regular meetings of the Council, and shall provide therein for public comment as required by law. In attendance shall be the City Manager, the City Clerk, and the City Attorney or their authorized designees. 5) READING OF MINUTES
The Clerk will read a synopsis of the minutes of the previous Council meeting at each Council meeting. Such reading of the minutes may however be dispensed with provided that the Clerk has previously furnished each member with a synopsis thereof. 6) ADJOURNMENT
A motion to adjourn shall always be in order and decided without debate. § 4.06.030. Responsibilities.

City Clerk: File all reports and resolutions.
§ 4.06.040. Relevant authority.

City Charter Section 500;
Stockton Municipal Code Section 2.04.010.
§ 4.06.050. Related administrative directive, city policy, city procedure.

None applicable.
§ 4.06.060. Related forms, documents, or links.

None applicable.
440
City of Stockton, CA
§ 4.06.070 § 4.06.080
Downloaded from https://ecode360.com/ST5019 on 2024-08-15

§ 4.06.070. Frequently asked questions.

None applicable.
§ 4.06.080. Update history.
3/16/81 - Adopted by Resolution No. 38,095
2/22/82 - Amended by Resolution No. 38,894
4/21/86 - Amended by Resolution No. 86-0222
10/26/87 - Amended by Resolution No. 87-0583
5/7/90 - Amended by Resolution No. 90-0286
2/4/92 - Amended by Resolution No. 91-0110
6/7/93 - Amended by Resolution No. 93-0377
2/23/10 - Amended by Resolution No. 10-0041
12/17/13 - Amended by Resolution No. 2013-12-17-1213
1/26/16 - Amended by Resolution No. 2016-01-26-1203
441

Resolution No.

STOCKTON CITY COUNCIL

RESOLUTION ADOPTING A REVISED CITY COUNCIL POLICY CHAPTER 4.06 , SECTION 4.06.010, RELATING TO THE USE OF ELECTRONIC DEVICES

Chapter 4.06, Section 4.06.010, subsection 2, of the Council Policy Manual addresses the use of electronic devices during meetings; and

In December 2023, the Legislation/Environmental Committee reviewed and discussed revisions to the entire council poli cy manual. Staff was directed to revise Section 4.06.010(2) regarding the use of electronic devices; and

On August 28, 2024, the Council Legislation/Environmental Committee, discussed proposed changes to Section 4.06.010(2) of the Council Policy Manual and recommended changes be forwarded to Council, now, therefore,

BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF STOCKTON, AS FOLLOWS:

1. The City Council approves the revisions to City Council Policy 4.06.010(2) entitled “Use of Electronic Communication Devises” attached hereto as Exhibit 1 and incorporated by this reference.

2. The City Manager is hereby authorized to take appropriate and necessary actions to carry out the purpose and intent of this Resolution.

PASSED, APPROVED and ADOPTED: September 10, 2024 .

KEVIN J. LINCOLN II
Mayor of the City of Stockton
ATTEST:

KATHERIN ROLNAD, CMC, CPMC
Interim City Clerk of the City of Stockton

442
City of Stockton, CA
§ 4.06.010 § 4.06.010
Downloaded from https://ecode360.com/ST5019 on 2024-08-15 CHAPTER 4.06

ROLES AND RULES
§ 4.06.010. Policy.
1) ROSENBERG'S RULES OF ORDER
The City Council adopts Rosenberg's Rules of Order unless provided otherwise in this Policy. 2) USE OF ELECTRONIC COMMUNICATION DEVICES
The Council's use of electronic communication devices during a City Council meeting, may lead to the public's perception that a Councilmember is not pa ying attention to the subject matter at hand or that a Councilmember is receiving information relative to the subject matter at hand that other Councilmembe rs and members of the public are not receiving, either one of which is inimical to good government and transparency.

Electronic Communication Device s means products designed to electronically process, transmit, or store information and includes but is not limited to devices such as cell phones, smart watches, ipads, tablets, and laptop computers.

The Council's use of electronic communication devices shall be restricted as follows:
a. Councilmembers are prohibited from usi ng electronic devices during a public meeting except when accessing agenda materials that are on a Councilmember's city issued ipad, tablet, or laptop computer.
b. Councilmembers are not prohibited from co mmunicating with family members or family care givers, on urgent personal matters or from communicating with outside parties on business related matters that do not address and are not related to City business. A councilmember wishing to respond to such a message during a meeting shall do so during a recess or shall excuse themselves from the meeting to place the return call or text in a manner that does not disrupt the meeting. c. Councilmembers are prohibited from using electronic devices during closed session.

No electronic devices shall be allowed in the location where closed session is held.

The Presiding Officer shall ensure that all members comply with this prohibition. 3) DUTIES OF PRESIDING OFFICERS
A) The Presiding Officer—Electi on and Duties. The presiding officer of the Council shall be the Mayor who shall be elected as provided in the Stockton City Charter. The Mayor shall preserve strict order and decorum at all meetings, announce the decisions of the Council and decide all questions of order consistent with Rosenberg's Rules of Order subject, however, to an app eal to the Council, in which ev ent a two-thirds vote of the Council shall govern and conclusively determine such questions of order.

B) Call to Order—Presiding Officer. The Mayor or, in his or her absence, the Vice Mayor shall take the chair precisely at the hour appointed for the meeting, and shall immediately call the Council to order. In the absence of the Mayor or Vice Mayor, the City Clerk, or his or her deputy, shall call the Council to order, whereupon a temporary chairperson shall be elected by the members of the Council present. Upon the arrival of the Mayor or
Vice Mayor, the temporary chairperson shall immediately relinquish the chair upon the EXHIBIT 1
443
City of Stockton, CA
§ 4.06.010 § 4.06.010
Downloaded from https://ecode360.com/ST5019 on 2024-08-15

conclusion of the business immediately before the Council. 4) RULES OF DEBATE
A) Except as provided below, the City Council will follow the latest version of Rosenberg's Rules of Order.

B) Presiding Officer May Debate and Vote. The Mayor or Vice Mayor or such other member of the Council as may be presiding may move, second, and debate from the Chair, subject only to such limitations of debate as are by these rules imposed on all members and shall not be deprived of a ny of these rights and privileges of a Councilmember by reason of acting as the presiding officer.

C) Getting the Floor—Improper References. Every member desiring to speak shall address EXHIBIT 1
444
City of Stockton, CA
§ 4.06.010 § 4.06.010
Downloaded from https://ecode360.com/ST5019 on 2024-08-15

the Chair, and, upon recognition by the presiding officer, shall confine all remarks to the question under debate, avoiding all personalities and indecorous language.

D) Interruptions. A member, once recognized, shall not be interrupted when speaking unless it is to call said member to order, or as herein otherwise provided. If a member, while speaking, be called to order, said member shall cease speaking until the question of order is determined, and, if in order, he/she shall be permitted to proceed.

E) Time Limit. Every member, on ce recognized, shall be limited in their debate to five minutes and shall, upon expiration of said time, relinquish the floor.

F) Privilege of Closing Debate. The Council member making the motion shall have the privilege of closing the debate.

G) Remarks of Councilmembers—When Ente red in Minutes. A Councilmember may request, through the presiding offi cer, the privilege of having a written abstract of said member's statement on any subject under c onsideration by the Council entered in the minutes. If the Council consents thereto, such statement shall be entered in the minutes. 5) ADDRESSING THE COUNCIL
Any person desiring to address the Council shall fi rst secure the permission of the presiding officer to do so; provided, however, that under the following headings of business, unless the presiding officer rules ot herwise, any qualified and interested person sh all have the right to address the Council upon obtaining recognition by the presiding officer.

A) Written Communications. Interested parties or their authorized representatives may address the Council by written communicati ons in regard to matters then under discussion.
i) Material that is submitted to the City Clerk one business day before the regular meeting, special meeting or workshop will be transmitted to the City Council prior to the meeting or workshop and made available to the public. ii) Material that is submitted to the City Clerk on the day of the meeting or workshop will be copied and placed on the dais pr ior to the meeting or workshop and made available to the public.
iii) Material that is presented at a meeting or workshop will be, to the extent practical, scanned and distributed to the City Council and made available to the public.

B) Oral Communications. Persons may address the Council by oral communications on any matter concerning the City's business, or any matter over which the Council has control.

Speakers may submit "Request to Speak" cards to the City Clerk who shall number them in the order in which they are received. The presiding officer shall call upon such persons to speak in such order, unless he or she determines that a d ifferent order is necessary to
facilitate the conduct of the meeting.

C) Visual Presentations. Members of the public wishing to use electronic media when addressing Council must provide the electronic file to staf f for screening no later than noon six days prior to the meeting. For example, for the Tuesday meeting, the electronic EXHIBIT 1
445
City of Stockton, CA
§ 4.06.010 § 4.06.010
Downloaded from https://ecode360.com/ST5019 on 2024-08-15

file must be provided to City staff by noon on the preceding Wednesday.

Screening ensures that the material is in a format capable of broadcast or presentation over the audiovisual system, assures that the material is germane to the agenda item and assures that the material is legally appropriate for broadcast over the audiovisual system and cable. No visual materials may be disp layed through the audiovi sual system that City staff has not screened.
i) Visual materials include any visual or textual items that are to be displayed through the audiovisual system irrespective of their specific format or media. This includes, without limitation, photographs, audio and video presentations, charts, computer presentations, computer screen images, pos ters and flyers, whether in physical or electronic format.
ii) The name of the person or the name of organization presenting the visual material must be included in the footer on every slide. If the presenter is representing a party to an appeal, the status of the party must also be included in the footer. iii) Visual Presentations during Public Comme nts are limited to five minutes, which includes the time necessary for oral remarks and all visual presentation.

Visual materials do not include items held or worn by a speaker at the podium or worn by a member of the audience, even though such items may be televised through the cameras that view the audience and the dais.

D) Public Hearings and Protes ts, Etc. Persons may addres s the Council by reading of protests, petitions, or communications relating to zoning, sewer and street proceedings, hearings on protests, appeals and petitions, or similar matters, in regard to matters then under consideration.

E) Addressing the Council After Motion is Made. Afte r a motion is made by the Council, no person shall address the Council without first securing the permission of the Council to do so.

F) Manner of Addressing Council— Time Limit. Persons addressing the Council shall step up to the podium and may give their name and address in an audible tone of voice. i) All remarks shall be addressed to the Council as a body and not to any member. No person, other than the Council and the pers on having the floor shall enter into any discussion, either directly or through a member of the C ouncil, without the permission of the presiding officer. No question shall be asked of a Councilmember except through the presiding officer.
ii) All comments, including visu al presentations, presented to the Council under any agenda item shall be limited to a maximum of five minutes but the presiding officer may waive this limitation when deemed necessary to accommodate more fully a citizen's request to be heard.
6) MISCELLANEOUS
EXHIBIT 1
446
City of Stockton, CA
§ 4.06.010 § 4.06.070
Downloaded from https://ecode360.com/ST5019 on 2024-08-15

All reports and resolutions shall be filed with the City Clerk and entered on the minutes. § 4.06.020. Procedure.
1) Except as provided below, the City Council will follow the latest version of Rosenberg's Rules of Order.
2) ROLL CALL
Before proceeding with the business of the Council, the City Clerk or his or her deputy shall call the roll of the members, and the names of those present shall be entered in the minutes. 3) QUORUM
A majority of all the members elected to the Council shall constitute a quorum at any regular or special meeting or study session of the Council.
4) ORDER OF BUSINESS
All meetings of the Council shall be open to the public, except for closed sessions as permitted by law. The Council shall provide by resolution the order of business for regular meetings of the Council, and shall provide therein for public comment as required by law. In attendance shall be the City Manager, the City Clerk, and the City Attorney or their authorized designees. 5) READING OF MINUTES
The Clerk will read a synopsis of the minutes of the previous Council meeting at each Council meeting. Such reading of the minutes may however be dispensed with provided that the Clerk has previously furnished each member with a synopsis thereof. 6) ADJOURNMENT
A motion to adjourn shall always be in order and decided without debate. § 4.06.030. Responsibilities.

City Clerk: File all reports and resolutions.
§ 4.06.040. Relevant authority.

City Charter Section 500;
Stockton Municipal Code Section 2.04.010.
§ 4.06.050. Related administrative directive, city policy, city procedure.

None applicable.
§ 4.06.060. Related forms, documents, or links.

None applicable.

EXHIBIT 1
447
City of Stockton, CA
§ 4.06.070 § 4.06.080
Downloaded from https://ecode360.com/ST5019 on 2024-08-15

§ 4.06.070. Frequently asked questions.

None applicable.
§ 4.06.080. Update history.
3/16/81 - Adopted by Resolution No. 38,095
2/22/82 - Amended by Resolution No. 38,894
4/21/86 - Amended by Resolution No. 86-0222
10/26/87 - Amended by Resolution No. 87-0583
5/7/90 - Amended by Resolution No. 90-0286
2/4/92 - Amended by Resolution No. 91-0110
6/7/93 - Amended by Resolution No. 93-0377
2/23/10 - Amended by Resolution No. 10-0041
12/17/13 - Amended by Resolution No. 2013-12-17-1213
1/26/16 - Amended by Resolution No. 2016-01-26-1203
EXHIBIT 1
448
City of Stockton
Legislation Text
File #: 24-0773, Version: 1
ADOPT AN ORDINANCE AMENDING TITLE 8, TO ADD CHAPTER 8.104 TO THE STOCKTON

MUNICIPAL CODE REGARDING ILLEGAL DUMPING AND A PUBLIC HEARING TO ADOPT A RESOLUTION APPROVING THE AMENDMENT TO THE FISCAL YEAR 2024-25 FEE SCHEDULE

RECOMMENDATION
It is recommended that the City Council:

1. Adopt an Ordinance amending Chapter 8 of the Stockton Municipal Code (“SMC”) to adopt and add Chapter 8.104 regarding Illegal Dumping.

2. Adopt a Resolution approving an amendment to Fiscal Year 2024-25 Fee Schedule relating to illegal dumping fines.

3. Authorize the City Manager, or designee, to submit the approved ordinance and resolution to the San Joaquin County Civil Grand Jury, in response to Case No. 0519, Illegal Dumping:

Talking Trash.

4. Authorize the City Manager, or designee, to take all appropriate and necessary actions to carry out the purpose and intent of the ordinance and resolution.

Summary
In the interest of protecting the public health, safety, and welfare of its residents and businesses, the Legislation and Environmental Committee ("Committee") requested that staff draft a proposed ordinance regarding illegal dumping in the City to bring to City Council for approval. SMC Chapter 8 regulates Health & Safety matters. Currently, the Chapter has no provisions prohibiting illegal dumping in the City of Stockton (“City”).

On May 15, 2024, the draft ordinance was approved by the Committee and was recommended to be proposed to Council. The proposed ordinance to the SMC extends financial liability of the owner or operator of a vehicle or trailer used to facilitate incidents of illegal dumping and will assist in slowing or preventing this hazardous trend.

DISCUSSION
Background
Illegal dumping causes threats to public health and safety, with negative impacts on property values, business climate in the City, the City’s natural environment and waterways, water quality, and quality of life for the entire community. There is also a high cost to the public for removal of the illegally City of Stockton Printed on 9/5/2024Page 1 of 3
powered by Legistar™
449
File #: 24-0773, Version: 1
dumped items such as mattresses, large furniture, electronic items, large appliances, recreational vehicles, boats, and biological and hazardous wastes. Remedies and penalties for illegal dumping currently in State and local laws are inadequate to protect the public and the environment, to compensate the public and victims of such acts, and to deter illegal dumping.

The Stockton Police Department (SPD) has been working with other city departments to develop an illegal dumping ordinance. The proposed ordinance, Chapter 8.104 to the SMC regarding illegal dumping, was developed with the City Attorney’s Office and was pulled from other existing ordinances used by other government entities.

The draft ordinance was approved by the Legislative and Environmental Committee on May 15, 2024, to bring forward to Council for review and approval. A redline version of the proposed ordinance is included as Attachment A.

Present Situation
The City has recently seen a significant increase in cases of illegal dumping. Illegal dumping can consist of someone discarding bags of trash in public areas, discarding old mattresses, furniture, tires, boats or vehicles. This creates substantial blight and often leads to additional items being discarded in the same areas.

In 2022, there were 249 reported cases of illegal dumping, and 222 reported cases in 2023. Within these two years, only 4 arrests were made for illegal dumping under California Penal Code (PC 374.4 / PC 374.3). Violators typically commit illegal dumping in isolated areas and within hours of darkness to avoid being detected by law enforcement.

The proposed ordinance will help safeguard our neighborhoods and areas of business against the harms of illegal dumping. Through community reporting and support, law enforcement will be aided in holding those financially and or criminally accountable for their roles in illegal dumping. Further, the adoption of the ordinance will assist the City in recovering funds spent cleaning up areas affected by illegal dumping.

Based on research of municipalities that prohibit illegal dumping and the Committee’s feedback, staff propose adding Chapter 8.104 to the SMC prohibiting illegal dumping in the City. This proposed ordinance addresses the Committee’s feedback as follows:

Prohibiting Illegal Dumping
Under the proposed ordinance, a vehicle owner and trailer owner is liable and responsible for illegal dumping when the owner's vehicle or trailer is used for illegal dumping with the express or implied permission of the owner, irrespective of whether the owner knew or should have known of the intended use of the vehicle or trailer. Violations of the proposed ordinance shall read as follows:

1. Illegal dumping in violation of this Chapter is determined to be an infraction, in addition to being subject to any administrative or civil penalties.

2. A violation of this Chapter may be prosecuted by City authorities in the name of the people of the State of California, through civil action, and through administrative proceedings.

City of Stockton Printed on 9/5/2024Page 2 of 3
powered by Legistar™
450
File #: 24-0773, Version: 1

3. Any person violating this Chapter shall be guilty of an infraction.

4. Violations of this Chapter are hereby declared to be a public nuisance.

5. All remedies prescribed under this Chapter are cumulative and the election of one (1) or more remedies does not bar the City from the pursuit of any other remedy to enforce this Chapter.

Violations and Penalties
Violations of the proposed ordinance is punishable by the following:

1. A fine/penalty of $1,000.00 for a first violation;

2. A fine/penalty of $2,000.00 for a second violation within one (1) year of action constituting the first violation;

3. A fine/penalty of $3,000.00 for each additional violation within one (1) year of action constituting the first violation.

The proposed ordinance provides, through cost recovery, that the City shall be reimbursed for all costs, including time, services, and materials needed to abate a violation of this Chapter and hold the dumping violator(s) accountable.

FINANCIAL SUMMARY
There are no General Fund costs associated with the adoption of the ordinance as drafted. As proposed, the City Manager may establish a special fund to pay rewards in the amount of no more than $250.00 to individuals providing information leading to identification of, and successful criminal or civil action against, any person violating this Chapter. The City Manager may create rules concerning administration of the fund and eligibility for rewards.

Upon approval, the FY 2024-25 Fee Schedule will be amended to include the following illegal dumping fines:

First Offense: $1,000
Second Offense: $2,000
Third or more Offense: $3,000
Attachment A - Proposed Ordinance Red-lined version
City of Stockton Printed on 9/5/2024Page 3 of 3
powered by Legistar™
451
1 ORDINANCE NO. ________________
AN ORDINANCE ADDING CHAPTER 8.104 T

O THE STOCKTON MUNICIPAL CODE

REGARDING ILLEGAL DUMPING

BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF STOCKTON, AS FOLLOWS:

SECTION I. FINDINGS AND INTENT.

It is the City’s purpose in adopting this Chapter to protect public and private property from illegal dumping and to hold any person that takes actions that substantially contribute to illegal dumping accountable. It is also the in tent of this Chapter to deter illegal dumping and to mitigate the harms that the City has found are caused by illegal dumping.

The City finds and declares as follows:

A. The City has a compelling interest in protecting the public health, safety, and welfare of its residents and businesses.

B. Illegal dumping causes t he following harms: (1) Threat s to the public health and safety; (2) Deterioration of property values; (3) Negative impacts to the business climate in the City; (4) A perception that the laws protecting pub lic and private property can be disregarded with impunity; (5) Threats to the City’s nat ural environment, including sensitive and important riparian habitats and waterways; (6) Th reats to the City’s water quality; (7) Diminishment of quality of life for persons near affected properties and the entire community; and (8) A high cost to the public for removal of the of illegally dumped items, especially large items such as mattresses, large furn iture, electronic items, large appliances, recreational vehicles, boats, and biological and hazardous wastes.

C. Remedies and penalties for illegal dumping currently in State and local laws are inadequate to protect the public and the envi ronment, to compensa te the public and victims of such acts, and to deter illegal dumping.

SECTION II. AMENDMENT OF CODE.

Title 8, Chapter 8.104, titled “ILLEGAL DUM PING”, is added to the Stockton Municipal Code and shall read as follows:

8.104.010 Relationship to Other Laws.

This Chapter shall be interpreted to be co
mpatible and consistent with City and State
enactments and in furtherance of the public pur poses which those enactments express.

It is the intention that the pr ovisions of this C hapter will supersede any other provisions of this Code found to be in conflict.

8.104.020 Definitions.

ATTACHMENT A
452
2 The following words and phrases, whenever used in this Chapter, shall be construed as defined in this Section:
“Costs” means and includes, but is not limited to, costs of removal and disposal of illegally dumped waste matter (including the equivalent cost of disposal if the City is not charged), costs of investigating the dumping and enforcement of this Chapter, including, but not limited to the time and expenses of City employees incurred by the City in identifying the dumping violator(s), court costs, and attorneys' fees. "Dumping violator" means any person who negligently, willfully, or intentionally causes or permits waste matter to be illegally dumped, including, but not limited to, any vehicle owner whose vehicle is used to illegally dump.
"Illegal dumping" means the willful, intentional, or negligent depositing, dropping, dumping, placing, or throwing of any waste matter onto public or private property that is not legally designated for the purpose of disposal of waste matter. “Illegal dumping” does not include “litter” as that term is defined in Penal Code Section 374.4. "Person" includes a natural person, firm, partnership, association, limited liability company, or corporation.
"Trailer" means a "trailer" as defined in California Vehicle Code Section 630. "Trailer owner" means an "owner" as defined in California Vehicle Code Section 460, but excludes a motor vehicle dealer, bank, credit union, acceptance corporation, or other licensed financial institution legally operating in this state or is another person who is not the registered owner and holds a security interest in the trailer. "Vehicle" means a vehicle as defined in California Vehicle Code Section 670, and a motor vehicle as defined in California Vehicle Code Section 415. "Vehicle owner" means an "owner" as defined in California Vehicle Code Section 460, but excludes a motor vehicle dealer, bank, credit union, acceptance corporation, or other licensed financial institution legally operating in this state or is another person who is not the registered owner and holds a security interest in the vehicle. "Waste matter" shall include any and all of the following terms as they are defined at Section 8.100.020 of this Code: “Debris,” “Garbage,” “Hazardous waste,” “infectious waste,” and “solid waste.”

8.104.030 Illegal Dumping Prohibited.

It is a violation of this Chapter for any person to illegally dump or to cause waste matter to be disposed of in violation of this Chapter, this Code, or State or Federal law.

ATTACHMENT A
453
3 8.104.040 Liability of Owner or Operator of Vehicle or Trailer Used in Illegal Dumping.

To the extent permitted by law, a vehicle owner and trailer owner is liable and responsible for illegal dumping when the owner's vehicle or trailer is used for illegal dumping with the express or implied permission of the owner, irrespective of whether the owner knew or should have known of the intended use of the vehicle or trailer.

8.104.050 Violations of this Chapter.

A. Illegal dumping in violation of this Chapter is determined to be an infraction, in addition to being subject to any administrative or civil penalties.

B. A violation of this Chapter may be prosecuted by City authorities in the name of the people of the State of California, through civil action, and through administrative proceedings.

C. Any person violating this Chapter shall be guilty of an infraction.

D. Violations of this Chapter are hereby declared to be a public nuisance.

E. All remedies prescribed under this Chapter are cumulative and the election of one (1) or more remedies does not bar the City from the pursuit of any other remedy to enforce this Chapter.

8.104.060 Fine/Penalty for Violation
A. A violation of this Chapter is punishable by the following:

1. A fine/penalty of $1,000.00 for a first violation;

2. A fine/penalty of $2, 000.00 for a second violation of this Chapter or of any statute or city or county code within the state that has the same or more restrictive elements as this Chapter including but not limited to the statutes identified in Subsection B of this Section within one (1) year of action constituting the first violation;

3. A fine/penalty of $3,000.00 for each addition al violation of this Chapter or of any statute or city or county code within the state that has the same or more restrictive elements as this Chapter, including but not limited to the statutes identified in Subsection B of this Section within one (1) year of action constituting the first violation.

B. A finding of a violation of any of t he following statutes constitutes an additional violation for purposes of calculating a fine/penalty pursuant to this Section:

1. Penal Code sections 374. 3, 374.4, 374.7, and 374.8;

ATTACHMENT A
454
4 2. Health and Safety C ode sections 117555, 25189.5;

3. Vehicle Code section 23112.7;

4. Fish and Game Code section 5652;

5. San Joaquin County Code of Ordinances , Title 5, Division 11, Chapter 1.

C. In the event any statute referred to in this Chapter is amended or succeeded by another enactment, it shall be deemed such amendments shall be automatically deemed adopted as part of this Chapter as if fully set forth herein.

8.104.070 Enforcement.

This Chapter may be enforced pursuant to Title 1, Chapter 1.20, or other chapters within Title 1 at the City’s discretion.

8.104.080 Illegal Dumping Reward Fund.

The City Manager may establish a special fund to pay rewards in the amount of no more than $250.00 to individuals providing information leading to identification of, and successful criminal or civil action against, any person violating this Chapter. The City Manager may create rules concerning administration of the fund and eligibility for rewards.

8.104.090 Cost Recovery.

The City shall be reimbursed for all costs, including time, services, and materials needed to abate a violation of this Chapter and hold the dumping violator(s) accountable unless the City waives reimbursement in whole or in part.

A. The hourly rate used to compute time spent to investigate, document, abate a violation, and recover costs shall be the actual costs.

B. The City is entitled to recover all Cit y costs for the voluntary and involuntary abatement of violations.

1. Voluntary abatement is the abatement of a violation by the owner after notification of the violation from the City that such violation exists and must be abated.

2. Involuntary abatement is t hat action that is performed by, under the direction of, or at the initial expense of the City.

SECTION III. SEVERABILITY.

If any provision of this ordinance or the application thereof to any person or circumstance is held invalid, that invalidity shall not affect other provisions, or applications of the fact

ATTACHMENT A
455
5 which can be given without the invalid provis ion or application, and to this end the provisions of this act are severable.

SECTION IV. EFFECTIVE DATE.

This ordinance shall be in full force and take effect 30 days after its passage.

ADOPTED:
___________________
EFFECTIVE: ___________________
_____________________________
KEVIN J. LINCOLN II
Mayor of the City of Stockton
ATTEST:

KATHERINE ROLAND, CMC, CPMC
Interim City Clerk of the City of Stockton

ATTACHMENT A
456
Resolution No.

STOCKTON CITY COUNCIL

RESOLUTION TO APPROVE AMENDMENT TO THE FISCAL YEAR 2024 -25 FEE

SCHEDULE RELATED TO ILLEGAL DUMPING FINES

On May 15, 2024, the Legislation and Environmental Committee ("Committee") requested staff to draft a proposed ordinance regarding illegal dumping in the City of Stockton (“City”) and bring it forward to City Council for approval. Stockton Municipal Code Chapter 8 regulates Health & Safety matters. Currently, the Chapter has no provisions prohibiting illegal dumping in the City; and

This proposed ordinance will help safeguard our neighborhoods and areas of business against the har ms of illegal dumping. Illegal dumping creates significant blight within the City, and often leads to continuous dumping in repeated areas; and

The City seeks to implement a fine to curb the rise in illegal dumping in City limits as proposed in the new ordinance section 8.104. The amended fee schedule is intended to recover the costs of enforcing the new section and all associated work the enforcement creates; now, therefore,

BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF STOCKTON, AS FOLLOWS:

1. The City Council approves the amendment of the Fiscal Year 2024-25 Fee Schedule to create new fees concerning illegal dumping, attached as Exhibit 1, and incorporated by this reference.

2. The City Manager is authorized to take whatever actions are necessary and appropriate to carry out the intent of this Resolution.

PASSED, APPROVED, and ADOPTED September 10, 2024 .

KEVIN J LINCOLN II
Mayor of the City of Stockton
ATTEST:

KATHERINE ROLAND, CMC CPMC
Interim City Clerk of the City of Stockton
457
EXHIBIT 1
FY 2024-25 Proposed New Fees

Police Department
Strategic Operations
Description Reason Proposed
Amount
Illegal Dumping Fines and Penalties
First Offense Violation of ordinance chapter 8.104
Illegal Dumping
$1,000.00
Second Offense Committed within (1) year of
action constituting the first violation
Violation of ordinance chapter 8.104
Illegal Dumping
$2,000.00
Third or Subsequent Offenses within (1) year of
action constituting the first violation
Violation of ordinance chapter 8.104
Illegal Dumping
$3,000.00
Division General Notes (Applicable to all fees)

458

CITY OF STOCKTON

ILLEGAL DUMPING ORDINANCE
City Council Meeting
September 10, 2024
Agenda Item 16.1
459
Background
• The PD has been working with other city departments to develop an Illegal Dumping Ordinance.
• The proposed ordinance, CHAPTER 8.104 TO THE STOCKTON MUNICIPAL CODE REGARDING ILLEGAL DUMPING, was developed with the City Attorney's Office and was pulled from other existing ordinances used by other government entities.
• The draft ordinance wa s  approved by the Legislative Committee on May 15, 2024, and recommended to move to City Council for
review/approval.
460
Ordinance Summary
• It is the City’s purpose in adopting this Chapter to protect public and private property from illegal dumping and to hold any person who takes actions that substantially contribute to illegal dumping accountable. It is also the intent of this Chapter to deter illegal dumping and to mitigate the harms that the City has f ound are caused by illegal dumping. • Most of the illegal dumping is transported to the dump site, either by vehicle or vehicle pulling a trailer . This ordinance is more specific to vehicles/trailers and the registered owners of those vehicles. If a person was arrested for illegal dumping, the y  would then be prosecuted as any other crime(Penal Code 374.4 / 374.3). These are very challenging cases to make an arrest on because the officers usually would need to witness the criminal act or respond during the commission of the crime.
• To assist with citing violators, this ordinance uses the assis tance  of citizens reporting license plates of vehicles/trailers. Hopefully with photos or video. 461
Ordinance Summary
462
Ordinance Summary
• Funds have been allocated by the City of Stockton for a rewards program in hopes of holding violators accountable. There will be a media campaign to advertise the program and how to report through our existing  Crime Stoppers Program/Partnership. • Any crime information will be sent to our Special Operation Division fo r  follow‐up and if there is probable cause to issue a  Stockton Municipal Code citation to the registered owner of the vehicle/trailer .  The waste matter would then be disposed of by Public Works.

Liability of Owner or Operator of Vehicle or Trailer Used in Illegal Dumping • To the extent permitted by la w, a vehicle/trailer owner is liable and responsible for illegal dumping when the owner's vehicle/trailer is used for illegal dumping with the express or implied permission of the owner, irrespective of whether the owner knew or should have known of the intended use of the vehicle/trailer .
463
Ordinance Summary
• Penalties / Violation
 First ‐ $1,000
 Second ‐ $2,000
 Third ‐ $3,000
Cost Recovery
• The City shall be reimbursed for all costs, including time, services, and materials needed to abate a violation of this Chapter and hold the dumping violator(s) accountable unless the City waives reimbursement in whole or in part.

Illegal Dumping Reward Fund
• The City Manag
er may establish a special fund to pay rewards in the amount of no more than $250.00 to individuals providing information leading to identification of, and successful criminal or civil action against, any person violating this Chapter . The City Manager may create rules concerning administration of the fund and eligibility fo r rewards. 464
Ordinance Summary
465
Ordinance Summary
Summary:
• Obtain Final City Council Approval
• Enact Ordinance
• Media campaign through Public Information Office (Social Media, Billboards, Public Events)
• Evaluating the placement of cameras at crucial areas to deter and assist with prosecution
• Yearly evaluation of progress and make changes as necessary QUESTIONS?
466
City of Stockton
Legislation Text
File #: 24-0852, Version: 1

COUNCIL COMMITTEE/BOARD AND COMMISSION MINUTES

RECOMMENDATION
Information item only. No action required.

City of Stockton Printed on 9/5/2024Page 1 of 1
powered by Legistar™
467
MINUTES .

COUNCIL AUDIT COMMITTEE
MEETING OF APRIL 22, 2024
Council Chamber, City Hall

1. CALL TO ORDER/ROLL CALL - 4:01 PM
Roll Call

Present:

Michael Blower
Susan Lenz

Absent:

Daniel Wright.

2. PUBLIC COMMENT
None

3. ITEM(S) FOR DISCUSSION

3.1 24-0417 APPROVE BY MOTION INTERNAL AUDIT STATUS REPORT Legislation Text
Attachment A - Internal Audit Status ReRort,P-df
Approve Motion 2024-04-22-0301 approving the Internal Audit Status Report, dated April 15, 2024.

Moved by: Michael Blower, seconded by Susan Lenz.

Vote: Motion carried 2-0
Yes: Michael Blower, and Susan Lenz.

Absent: Daniel Wright.

3.2 24-0418 APPROVE BY MOTION THE AUDIT FINDINGS TRACKING REPORT Legislation Text
Attachment A - COS Audit Findings Tracking ReRort,P.df
Attachment B -Audit Grai;ih.ru!f
Approve Motion 2024-04-22-0302 approving the Audit Findings Tracking Report, dated April 15, 2024.

Moved by: Michael Blower, seconded by Susan Lenz.

Vote: Motion carried 2-0
Yes: Michael Blower, and Susan Lenz.
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484

MINUTES

PLANNING COMMISSION
MEETING OF APRIL 25, 2024
425 N. El Dorado St. Stockton, CA

1. CALL TO ORDER/ROLL CALL - 5:30 PM
Roll Call

Present:

Anne Mallett
Brenda Jones
Waqar Rizvi
Greg Thompson
Gurneel Boparai
Terry Hull

2. PLEDGE TO FLAG
The Pledge of Allegiance was led by Vice Chair Boparai

3. ADOPTION OF CONSENT CALENDAR

3.1 24-0425 APPROVAL OF PLANNING COMMISSION MINUTES
Legislation Text
Attachment A- 2023-11-09 Planning Commission Minutes
Approve Motion 2024-04-25-0301 approving the filing of minutes of the November 9, 2023 Planning Commission meetings.

Moved by: Gurneel Boparai, seconded by Anne Mallett.

Vote: Motion carried 4-0
Yes: Anne Mallett, Waqar Rizvi, Gurneel Boparai, and Terry Hull.

Recuse: Brenda Jones and Greg Thompson.

4. PUBLIC COMMENT
Hasen Lester- congratulated commissioners; homelessness

5. PUBLIC HEARINGS/ENVIRONMENTAL ASSESSMENTS
None

6. NEW BUSINESS

6.1 24-0285 FISCAL YEAR 2024-2029 CAPITAL IMPROVEMENT PROGRAM - CONFORMITY DETERMINATION TO THE ENVISION STOCKTON 2040
485

GENERAL PLAN
Legislation Text
Attachment A- DRAFT FY 2024-2029 Preliminary CIP
ProRosed Resolution - Recommending ARi:iroval
PPT - 6.1 - CIP General Plan ConformitY.
6RRroved Resolution 2024-04-25-0601
Approve Resolution 2024-04-25-0601 forwarding a determination to the City Council that the 2024-2029 Capital Improvement Program (CIP) for Fiscal Years (FY) 2024- 25 through 2028-29 conforms to the Envision Stockton 2040 General Plan.

Moved by: Waqar Rizvi, seconded by Greg Thompson.

Vote: Motion carried 6-0
Yes: Anne Mallett, Brenda Jones, Waqar Rizvi, Greg Thompson, Gurnee! Boparai, and Terry Hull.

7. UNFINISHED BUSINESS
None

8. REPORTS/COMMUNICATIO NS/INFORMATIONAL ITEMS
Mike McDowell, Assistant Director Community Development Department - warehouse ordinance at the next Planning Co.mmission meeting; May 23, 2024 Planning Commission potential meeting cancellation.

9. COMMISSIONERS COMMENTS
Commissioner Rizvi - commended city staff
Commissioner Thompson - State of the City; thanked staff Chair Hull - thanked staff and commissioners

10. ADJOURNMENT· 5:51 PM
�
Michael McDowell
Assistant Director, Community Development
Department
486

MINUTES

PLANNING COMMISSION
MEETING OF JUNE 13, 2024
425 N. El Dorado St. Stockton CA

1. CALL TO ORDER/ROLL CALL- 5:30 PM
Roll Call

Present:

Brenda Jones
Waqar Rizvi
Gurneel Boparai
Terry Hull
Esperanza Vielma

Absent:

Anne Mallett, and Greg Thompson.

Note: Commissioner Mallett and Commissioner Thompson's absences were excused.

2. PLEDGE TO FLAG

3. ADOPTION OF CONSENT CALENDAR

3.1 24-0604 APPROVAL OF PLANNING COMMISSION MINUTES
Legislation Text
Attachment A- 2024-03-28 PC Minutes
Attachment B - 2024-04-11 PC Minutes
Approve Motion 2024-06-13-0301 approving the filing of the minutes of the March 28, 2024 and April 11, 2024 Planning Commission meetings.

Moved by: Waqar Rizvi, seconded by Brenda Jones.

Vote: Motion carried 5-0
Yes: Brenda Jones, Waqar Rizvi, Gurneel Boparai, Terry Hull, and Esperanza Vielma.

Absent: Anne Mallett, and Greg Thompson.

4. PUBLIC COMMENT

5. PUBLIC HEARINGS/ENVIRONMENTAL ASSESSMENTS

5.1 23-0680 A RESOLUTION RECOMMENDING THE CITY COUNCIL ADOPT A GENERAL PLAN AMENDMENT TO APPROVE THE 2023-2031 HOUSING

ELEMENT AND UPDATE THE SAFETY ELEMENT TO COMPLY WITH STATE LAW
487
Legislation Text
Attachment A- Housing Element Draft January 2024
Attachment B - SafetY. Element Background ReP.ort
Attachment C - Draft Safe1Y. Element (Redlines).

Attachment D - HCD resP.onse-052224
Attachment E - CEQA Determination
ProP.osed Resolution Recommending AP.proval Housing Element - Safety Element Exhibit 1 - 2023-2031 Housing Element
Exhibit 2 - Draft SafetY. Element
PPT-Housing-Safecy.-Updates
8P.P-roved Resolution 2024-06-13-0501
Approve Resolution 2024-06-13-0501 recommending that the City Council:

1. Find no further environmental review is required per California Environmental Quality Act (CEQA) Guidelines Section 15183 (Consistency with a Community Plan or General Plan); and

2. Adopt a Resolution amending the Stockton General Plan to approve the 2023- 2031 Housing Element and update the Safety Element for consistency with State Law.

Moved by: Waqar Rizvi, seconded by Brenda Jones.

Vote: Motion carried 5-0
Yes: Brenda Jones, Waqar Rizvi, Gurneel Boparai, Terry Hull, and Esperanza Vielma.

Absent: Anne Mallett, and Greg Thompson.

6. NEW BUSINESS
None

7. UNFINISHED BUSINESS
None

8. REPORTS/COMMUNICATIONS/INFORMATIONAL ITEMS
Mike McDowell, Assistant Director Community Development Department - Trinity Parkway Appeal, upheld by City Council; annual progress, housing element

9. COMMISSIONERS COMMENTS
Commissioner Rizvi - welcomed Commissioner Vielma
488

10. Commissioner Jones - Juneteenth celebration, honoring mother, Dorothy L. Jones Chair Hull - welcomed Commissioner Vielma
ADJOURNMENT - 6:19 PM
Michael McDowell
Assistant Director, Community Development
Department
489

MINUTES

PLANNING COMMISSION
MEETING OF JUNE 27, 2024
425 N. El Dorado St. Stockton, CA

1. CALL TO ORDER/ROLL CALL - 5:31 PM
Roll Call

Present:

Anne Mallett
Brenda Jones
Waqar Rizvi
Greg Thompson
Gurneel Boparai
Terry Hull

Absent:

Esperanza Vielma.

2. PLEDGE TO FLAG
The Pledge of Allegiance was led by Commissioner Mallet

3. ADOPTION OF CONSENT CALENDAR
None

4. PUBLIC COMMENT
None

5. PUBLIC HEARINGS/ENVIRONMENTAL ASSESSMENTS

5.1 24-0485 TENTATIVE PARCEL MAP FOR CONDOMINIUM PURPOSES AT 3548 GRANGE AVENUE (APN 111-400-27) (APPLICATION NO. P22-0437) Legislation Text
Attachment A- Vicinity Mag
Attachment B - Zoning Mag
Attachment C - General Plan Land Use MaR
Attachment D - Public Comments
Pro12osed Resolution
Exhibit 1 -Tentative Parcel Ma12
Exhibit 2 - Project Plans
�QQroved Resolution 2024-06-27-0501
490
PPT- Tentative Parcel MaP-
Approve Resolution 2024-06-27-0501 :

1. Finding no further environmental review is necessary from the California Environmental Quality Act (CEQA) as the project is categorically exempt pursuant to CEQA Guidelines Section 15315 (Minor Land Divisions) and Section 15332, (In-fill Development Projects)

2. Adopting a Resolution approving the proposed Tentative Parcel Map for Condominium purposes, Design Review and Administrative Exception based on findings and subject to conditions of approval herein.

Moved by: Gurneel Boparai, seconded by Waqar Rizvi.

Vote: Motion carried 6-0
Yes: Anne Mallett, Brenda Jones, Waqar Rizvi, Greg Thompson, Gurneel Boparai, and Terry Hull.

Absent: Esperanza Vielma.

5.2 24-0555 REQUEST FOR A USE PERMIT TO ALLOW THE DEVELOPMENT OF A

CEMETERY ON THE GROUNDS OF THE EXISTING CANO FUNERAL HOME, LOCATED AT 2164 EAST DR. MARTIN LUTHER KING, JR. BOULEVARD (P24- 0005) (APN: 171-370-03)
Legislation Text
Attachment A- Zoning Ma12
Attachment B -General Plan Ma12
Attachment C -Aerial Mai:2
Attachment D - Project Plans
Pror2osed Resolution
Exhibit 1 - Project Plans
�r2r2roved Resolution 2024-06-27-0502
PPT - reguest for use Qermit
Committee CorresQondence - Public Comments
The following persons spoke to the item: Alexandra Garza, Paulina Gonzales, Daniel Gonzales, and Ray Lacondeguy
Approve Motion 2024-06-27-0502 waiving the reading of Commissioner Correspondence
Moved by: Waqar Rizvi, seconded by Brenda Jones.

Vote: Motion carried 6-0
Yes: Anne Mallett, Brenda Jones, Waqar Rizvi, Greg Thompson, Gurneel Boparai, and Terry Hull.
491

Absent: Esperanza Vielma.

Approve Resolution 2024-06-27-0502:
1) Finding that no further environmental review is necessary fer the project pursuant to CEQA Guidelines Section 15183 (Projects Consistent with a Community Plan, General Plan, or Zoning) of Title 14 of the California Code of Regulations 2) Approving the request for a Commission Use Permit to allow the development of an approximate 3.9 acre cemetery, in accordance with the findings and subject to the conditions in the proposed Resolution.

Moved by: Gurnee! Boparai, seconded by Greg Thompson.

Vote: Motion carried 6-0
Yes: Anne Mallett, Brenda Jones, Waqar Rizvi, Greg Thompson, Gurneel Boparai, and Terry Hull. ••

Absent: Esperanza Vielma.

6. NEW BUSINESS
None

7. UNFINISHED BUSINESS
None

8. REPORTS/COMMUNICATIONS/INFORMATIONAL ITEMS
Mike McDowell, Deputy Director, Planning & Engineering - commissioner attendance

9. COMMISSIONERS COMMENTS
Commissioner Rizvi - community engagement

10. ADJOURNMENT - 6:40 PM