Resolution No.
STOCKTON CITY COUNCIL
RESOLUTION AUTHORIZING CONTRACT CHANGE ORDER NO. 3 WITH SORACCO INC FOR ON-CALL UTILITY REPAIR SERVICES FOR CITYWIDE WASTEWATER COLLECTION AND WATER DISTRIBUTION SYSTEMS The Municipal Utilities Department (MUD) staff maintain, inspect, and repair collection and water distribution systems as part of the regular maintenance program required to safely transport wastewater for treatment at facilities owned and operated by the City and distribute drinking water to customers in north and south Stockton; and To respond in a timely manner to larger scale repair projects, MUD has negotiated Contract Change Order (CCO) No. 3 to add on-call repair services to water production systems, and emergency repair services for sanitary sewer pipelines larger than 24” in diameter; and Staff recommend that the City Council adopt a resolution to approve CCO No. 3 with Soracco, Inc for additional wastewater collection and water production systems services in the amount of $1,200,000 for a total contract amount not-to-exceed $8,230,000; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF STOCKTON, AS FOLLOWS:
Contract Change Order No. 3 with Soracco, Inc. in the total not-to-exceed amount of $8,230,000 is hereby approved, and the City Manager is authorized and directed to execute same, a copy of which is attached as Exhibit 1 and incorporated by this reference.
The City Manager or designee is hereby authorized to take appropriate and necessary actions to carry out the purpose and intent of this Resolution.
PASSED, APPROVED, and ADOPTED November 12, 2024 .
KEVIN J. LINCOLN II
Mayor of the City of Stockton
ATTEST:
KATHERINE ROLAND, CMC, CPMC
Interim City Clerk of the City of Stockton