Resolution No.
STOCKTON CITY COUNCIL
RESOLUTION APPROVING THE NOTICE OF EXEMPTION NO. NOE 23-25, APPROVING THE PLANS AND SPECIFICATIONS, AND AWARDING A CONSTRUCTION CONTRACT FOR THE STREET RESURFACING ON FEDERAL-AID STREETS FISCAL YEAR 2020-21, PROJECT NO. WD21006/FEDERAL PROJECT NO. CRRSTPL-5008(208) On March 27, 2025, the City Clerk of the City of Stockton opened, examined, and publicly declared the sealed proposals or bids offered for the Street Resurfacing on Federal-Aid Streets Fiscal Year (FY) 2020-21, Project No. WD21006/Federal Project No. CRRSTPL-5008(208); and The project will resurface three street segments located on Benjamin Holt Drive from Grisby Place to Plymouth Road, Carolyn Weston Boulevard from Manthey Road East to Manthey Road West, and Hammer Lane from Kelley Drive to 460 feet west of Mariners Drive for a total distance of approximately one mile; and The project includes asphalt concrete overlay, base failure repairs, slurry seal, full-depth reclamation up to 19 inches in depth, pavement grinding and cold planning up to 6 inches in depth, removal and installation of pavement markings/striping, lowering and raising existing utilities to finish grade, installing curb ramps to meet Americans with Disabilities Act compliance, and installation of traffic loops; and United Pavement Maintenance, Inc. is the lowest responsive bidder in the amount of $3,545,028.60 and its bid is regular in all respects; and The project is in conformance with the City’s General Plan, pursuant to California Government Code, section 65402, and is categorically exempt from the requirements of the California Environmental Quality Act (CEQA) as specified under section 15301(c) of the CEQA Guidelines, because this is a discretionary project under the City’s jurisdiction and qualifies as project which has been determined to not have a significant effect on the environment; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF STOCKTON, AS FOLLOWS:
1. The City Council approves the filing of Notice of Exemption No. NOE 23-25 under the CEQA for the Street Resurfacing on Federal-Aid Streets FY 2020-21, Project No. WD21006/Federal Project No. CRRSTPL-5008(208), a copy of which is attached as Exhibit 1 and incorporated by this reference.
2. The City Council approves the plans and specifications for the Street Resurfacing on Federal-Aid Streets FY 2020-21, Project No. WD21006/Federal Project No. CRRSTPL-5008(208).
3. The City Council awards a Construction Contract between the City of Stockton and United Pavement Maintenance, Inc. in the amount of $3,545,028.60, and the City Manager is authorized and directed to execute same, a copy of which is attached as Exhibit 2 and incorporated by this reference.
4. The City Manager is hereby authorized to take whatever actions are necessary and appropriate to carry out the purpose and intent of this Resolution.
PASSED, APPROVED, and ADOPTED May 13, 2025 .
CHRISTINA FUGAZI
Mayor of the City of Stockton
ATTEST:
KATHERINE ROLAND, CMC, CPMC
City Clerk of the City of Stockton