EXHIBIT 2

Wilson Way Pump Station Electrical & Instrumentation – Operations and Maintenance Data City of Stockton 26 01 26 - 2

that cannot be read or have been reduced will be returned for correction.

3. Drawings:

a. Provide in separate reinforced punched binder to allow drawings to be easily removed.
b. For 11-inch by 17 -inch shop Drawings provide in an 11½ -inch by 17½ - inch folder. Do not fold. 11”x17” drawing shall not be reduced for O&M manuals.
c. Drawings larger than 11 -inch by 17 -inch to be placed in an 8½ -inch by 11-inch envelopes bound in text.
d. Suitably identified on Drawing binder.
e. Referenced clearly with index of drawings by title and drawing numbers.

4. Binders: Commercial quality, permanent, all white in color, three -ring, durable, cleanable plastic covers with inserts, insertable full height and width, front, back, and spine, with full -page sheet lifters, as manufactured by “K&M Company, Torrance, California 90503, 2- inch with pocket D -Ring View Binders,”“Manufacturer No. 79792.” Model VS11 -20, Wilson Jones D -Ring Binders, or approved equal. All binders shall be 2-inch size.

5. Folder: Commercial quality, permanent. Two-hole “Sandwich” type.

6. Indexing: The manuals shall be fully indexed by use of “Avery Side Tab Legal Index Exhibit Dividers LGT5S1-25,” “Avery Number AVY11370”, Wilson Jones Commercial Indexes with pre-printed tabs, or approved equal.

7. Cover and Spine:
a. The cover sheet format inserted in the front of the view binder shall be as stated above herein.
b. The spine format inserted in the spine of the view binder shall list:

1. Volume X of X.

2. Operation and Maintenance Manual.

3. Supplier Name.

4. Project Name.

5. Binder Contents.

8. Numbering: Number all pages within the O&M manual. The number shall be located ½-inch from the bottom, centered on each page. The system used within each tabbed section shall be the tab section -page number sequentially numbered (i.e., 1-1, 1-2, 1-3, and so on).

9. All of these sets of O & M manuals, shall be made up of "original" (no copies or reproductions) documents. No photo or fax copies are allowed of standard published manuals available from manufacturers.

C. Review:

1. Submittals that are not fully indexed and tabbed with sequentially numbered pages shall be returned without review.

Page 2 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Electrical & Instrumentation – Operations and Maintenance Data City of Stockton 26 01 26 - 3

2. The Engineer has allowed for up to and including two (2) reviews of each submittal. The Engineer shall be reimbursed for all reviews after the first two reviews by the Owner and the Owner will deduct the amount of the reimbursement from the Contractor’s Contract. The Engineer’s reimbursement shall be on a time and expense basis and the current billing rate of the Engineer. The Engineer shall be the sole source for determining the suitability of any submittal.

D. O&M manual shall be properly completed, submitted, and approved prior to the personnel training.

1.05 CONTENT OF MANUALS
A. Product of Data:

1. Include only those sheets which are pertinent to the specific product.

2. Annotate each sheet to:

a. Clearly identify the specific project or part installed. b. Clearly identify the data applicable to the installation. c. Cross-out references to inapplicable information.

B. Drawings:

1. Supplement product data with Drawings as necessary to clearly illustrate:

a. Relations of component parts of equipment and systems. Include individual parts list with exploded views for all equipment. b. Control and flow diagrams.

2. Coordinate Drawings with information in project Contract documents to assure correct illustration of completed installation.

3. Do not use project Contract documents as maintenance drawings.

4. “As Constructed” set of submittal drawings for all items in the electrical system as specified in Section 26 05 03 - Electrical Submittal and Drawing Requirements.

5. The Contractor shall include in his bid price an additional 80 hours of as -built documentation changes to be designated during testing and start -up by the Engineer or Owner. All hours not used shall be credited back to the Owner at rate listed on Bid Schedule.

C. Written text as required to supplement product data for the particular installation:

1. Organize in a consistent format under separate headings for different procedures.

2. Provide a logical sequence of instructions for each procedure.

D. Provide the index and information layout in the operation and maintenance manual for

Page 3 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Electrical & Instrumentation – Operations and Maintenance Data City of Stockton 26 01 26 - 4

each unit of equipment, and system, including electrical, and electronic items as follows:

1. Cover sheet including the following:

a. Volume __ of __.
b. Operation and Maintenance Manual.
c. Project title.
d. Owner project number.
e. Manufacturer:

i. Manufacturer’s name.
ii. Full address.
f. Date.

2. Document Index: Neatly typewritten document index for each volume, arranged as indicated in Appendix “A”. Master Table of Contents shall be placed in Volume 1 itemizing all of the information included in the O&Ms and the corresponding volume location of that information.

3. Equipment Record or Instrument Data Sheet:
a. Equipment record or Instrument Data Sheet as specified in Section 26 05

03. b. A complete list of items supplied, including serial numbers, ranges, options, and other pertinent data necessary for ordering replacement parts.
c. Name and location of nearest parts supplier for all equipment.

4. Warranty:

a. Provide copy of warranty as specified in Section 26 05 00. Include procedures in the event of failure.
b. Provide copy of substantial completion with corresponding warranty duties.

5. Theory of Operation.

6. Description. Provide description of units and components parts function, normal operating characteristics, and limiting conditions.

a. Include general descriptive bulletins, brochures, or catalog sheets to describe the equipment.
b. Performance curves, engineering data, and tests.

7. Operating Instructions: Complete, detailed, written English description of the sequence of operating sequence for all control system (including PLC) and operations in all modes. The description shall be specifically prepared for this work, and shall be fully referenced to control diagrams and system components:

a. Recommended step-by-step startup, adjustment, calibration and break -in operating instructions.

Page 4 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Electrical & Instrumentation – Operations and Maintenance Data City of Stockton 26 01 26 - 5

b. Routine and normal operating instructions. Include summer and winter operating instructions as applicable. Also include special operating instructions.
c. Recommended step-by-step regulation, control, stopping, and shut -down instructions.
d. No photocopies are allowed of standard published manuals available from manufacturers.
e. Recommended step-by-step Emergency Instructions.
f. Current and desired control settings. Set points shall be documented in O&M manual prior to final acceptance.

8. Maintenance Instructions:

a. Lubrication schedule and list of lubrication required. b. Detailed service, maintenance and operation instructions for each item supplied. Preventative maintenance to include routine operation, alignment, adjusting and checking. Include illustrations, assembly drawings, and diagrams required for maintenance. Preventative maintenance procedure and schedule for all equipment over a five-year cycle.
c. Corrective maintenance to include disassembly, repair, overhaul and reassembly.
d. Schematic diagrams of all electronic devices shall be included. A complete parts list with stock numbers shall be provided on the components that make up the assembly.
e. Special maintenance requirements particular to this system shall be clearly defined, along with special calibration and test procedures. f. No photocopies are allowed of standard published manuals available from manufacturers.
g. Include Maintenance Program data entry forms.
h. Original manuals (no copies) shall be provided for all instruments and PLC components.

9. Shipping and Installation:

a. Receiving and handling.
b. Long-term storage and short-term storage.
c. Complete step-by-step installation instructions of all components.

10. Safety Procedures:
a. Manufacturer’s safety procedures for operating and maintaining all equipment and materials used.

11. List of recommended spare parts:

a. Original manufacturer’s parts list with manufacturer’s current prices.

Include complete nomenclature and commercial numbers of replaceable parts.
b. Predicted life of parts subject to warranty.

Page 5 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Electrical & Instrumentation – Operations and Maintenance Data City of Stockton 26 01 26 - 6

c. Items recommended to be stocked as spare parts.
d. Complete nomenclature and commercial number of all replaceable parts.

12. Test Data:
a. Include all completed and signed test data and forms from factory and field testing.

13. Troubleshooting instructions.

14. Equipment catalogue sheets and submittals.
a. I nclude copy of all approved submittals supplied under Section 26 05 03.

15. Drawings:
a. All Electrical & Instrumentation Drawings to include:
1) As-built set of all required Drawings per Section 26 05 03 for the project.
2) As-built drawings shall be signed and stamped by a registered Electrical Engineer in the State of California.

16. Complete software ladder logic printouts.

17. Record of all settings or parameters for all programmable devices.

18. At the end of the project these manuals shall be updated to show “as-built” or “as- installed” conditions.

19. Provide to the Owner two sets of CDs containing all AutoCAD as -built electrical and instrumentation drawings prepared for this project, and software ladder logic programs. Software disks shall contain the ladder logic program with all support files. These disks shall be the property of the Owner, for its use on this and future projects.

2 PART 2 MATERIALS

NOT USED

END OF SECTION

Page 6 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Electrical
City of Stockton 26 05 00 - 1

SECTION 26 05 00

ELECTRICAL

PART 1 GENERAL

1.01 SCOPE OF WORK
A. The Contractor shall install, ready for use, the electrical system as specified in Division 26 00 00 and shown on the Contract Drawings. This document describes the function and o peration of the system and particular components, but does not necessarily describe all necessary devices. All components and devices shall be furnished and installed as required to provide a complete operable and reliable system for accomplishing the functions and meeting the performance set forth hereinafter.

B. Contractor’s bid shall include first or second named or second named as indicated on the Drawings or in these Specifications. Where Drawings or Specifications call for a particular manufacturer “or equal”, the Contractor must prepare his base bid using the first or second named equipment.

Contractor shall bear the full responsibility for including in his bid any equipment, which is later found to be unacceptable or NOT equal to the equipment specified.

C. Furnish all required labor, materials, project equipment, tools, construction equipment, safety equipment, transportation, test equipment, incidentals, and services to provide a complete and operational electrical system as shown on the Drawings, included in these Specifications, or required for fully operating facilities. Use Device Indexes and Contract Drawings typical installation details for mounting detail requirements to be provided for equipment listed.

D. Examine the Specification and Drawings for mechanical equipment and provide all starters, circuit breakers, switches, pushbuttons and appurtenances which are not specified to be with the mechanical equipment. Erect all electrical equipment not definitely stated to be erected by others, furnish and install conduit, wire, cable, and make connections required to place all equipment in complete operation.

E. Contract Elementary Drawings do not show all electrical interfaces, lockouts, etc. required for motor control. These Drawings show general layout and have made provisions for interlocks, solenoid valve control, etc. and are only typical. Contractor is responsible for examining the Contract Series Drawings for all motor control interfaces, temperature switches, solenoid valves, float switches and device lockout, requirements. The Contractor’s submitted elementary diagrams shall show all motor controls and interlocks for the specific piece of equipment. Provide a separate set of elementary diagrams for each similar group of equipment. It is within the Contractor’s scope of work to submit elementary diagrams that not only show the MCC bucket wiring, but also include the field interlocks, motor heaters, protective devices, valve controls, etc. The Contractor’s Elementary submittal Drawings shall also show field terminal block numbers for each of the field interlocks and valve controls.

F. The major areas in the Division scope of work are shown on the drawings and as designated on the Division 26 00 00 plans, which include both the furnishing and installation of are:

1. Motor Control Centers including motor starters.

2. Processor Logic Controllers (PLC) and Operator Interface (OI) hardware for controlling the pumps, aerators, drives, etc. and other miscellaneous devices. The Contractor is to

Page 7 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Electrical
City of Stockton 26 05 00 - 2

provide all configuration, programming and setup of the PLCs.

3. Conduits, and the field interconnection wiring between the equipment, pumps, MCCs, control panels, panelboards, field devices, etc.

4. All necessary miscellaneous shut off, sample, and calibration valves to sensors.

5. Trenching, backfilling, compaction, and resurfacing for all new underground conduit routes.

6. Building electrical devices, lights, and receptacles.

7. Grounding system and equipment grounding.

8. Installation of primary devices, equipment and instruments, are not completely detailed on Contract drawing plan sheets. Use Device Indexes and Contract Drawings installation details for installation and mounting requirements.

9. Conduits, wiring, and terminations of all wiring associated with panels and equipment supplied under all other Divisions.

10. Removal and disposal of excess materials from excavation, pavement removal and demolition work.

G. Provide all necessary hardware, conduit, wiring, fittings, and devices to connect the electrical equipment provided under other Sections. The following shall be done by the Contractor at no additional cost to the Owner:

1. Provide additional devices, wiring, conduits, relays, and isolators to complete interfaces of the electrical and instrumentation system.

2. Changing normally open contacts to normally closed contacts or vise versa.

3. Adding additional relays to provide more contacts as necessary to carry out work specified.

4. Other work implied by the Contract documents.

H. The following Specifications incorporate specific equipment and devices that are preferred by the Owner because of their serviceability, because of the local availability of labor, parts and materials, or because of the ability of the Owner to umbrella the equipment under existing maintenance Contracts; however, favorable alternatives proposed in writing during the submittal process will be reviewed by the Owner as whether it is acceptable as an approved equal.

I. All electrical equipment and materials, including installation and testing, shall conform to the applicable codes and standards listed in this and other Sections. All electrical work shall conform with the National Electrical Code (NEC) 2013 issue. Nothing on the Drawings nor in the Specifications shall be construed to permit work or materials not conforming to these codes and standards.

J. Contractors which propose to bid on this project are encouraged to attend the pre -bid job walk to accomplish the following:

Page 8 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Electrical
City of Stockton 26 05 00 - 3

1. Thoroughly examine existing conditions before submitting his bid proposal to perform any work. He shall compare site conditions with data given on the plans or in these Specifications. No allowance shall be made for any additional costs incurred by the Contractor due to his failure to have examined the site or to have failed to report any discrepancies to the Owner prior to bid.

2. Verify all measurements and conditions and shall be responsible for the correctness of same. No extra compensation will be allowed because of differences between work shown on the Drawings and measurements at the site.

K. It is the Contractor’s responsibility to be fully familiar with the existing conditions and local requirements and regulations. New MCCs and generators are to be installed in areas with limited space. MCC and generator footprints were developed based on best available information.

Contractor is responsible for any additional conduits, wires, construction costs, engineering design requirements, etc to accommodate MCCs and generators that are larger than that shown on Contract Documents.

L. Any major deviations in location and conduit routing that the Contractor makes without the express written review or direction of the Engineer, shall be considered to have been made at the Contractor’s sole responsibility. Such deviations made by the Contractor shall be reflected on the Contractor supplied “Record Drawings” and Conduit Schedule. The Contractor will reimburse the Electrical Engineer and the Owner and then will deduct an amount equal of reimbursement from the Contractor’s contract for all engineering, drafting, and clerical expenses associated with updating the Record Drawings and Conduit Schedule due to any major unauthorized changes.

M. The term “Engineer” used throughout this Division 16 is the “El Dorado Irrigation District” Engineer or their designated Engineer representative.” The term “Owner” in Division 16 is the Delhi Irrigation District. When “Contractor” is listed in these documents without further definition such as “Contractor”, it is to mean the “Prime or General Contractor.”

1.02 CODES AND STANDARDS
A. All electrical/instrumentation equipment and materials, including installation and testing, shall conform to the following applicable codes and standards:

1. ANSI - American National Standards Institute, Inc.

2. EIA - Electronics Industries Association.

3. ETL - Electrical Testing Laboratories.

4. FM - Factory Mutual.

5. GO128 - General Order No. 128, Rules for Construction of Underground Electrical Supply and Communication Systems, PublicUtilities Commission of the State of California.

6. IEEE - Institute of Electrical and Electronics Engineers.

7. ICEA - Insulated Power Cable Engineers' Association.

8. ISA - International Society for Measurements & Control (ISA) Standards (formerly Instrument Society of America).

9. JIC - Joint Industrial Council.

10. NEC - National Electrical Code, 2005 Edition.

11. NEMA - National Electrical Manufacturers Association.

12. NETA - Acceptance Testing Specifications for Electrical Power Distribution Equipment and Systems, International Electrical

Page 9 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Electrical
City of Stockton 26 05 00 - 4

Testing Association.

13. NESC - National Electrical Safety Code.

14. NFPA - National Fire Protection Agency.

15. OSHA - Occupational Safety and Health Act Standards.

16. UL - Underwriter's Laboratories, Inc.

B. The revisions of these codes and standards in effect on the date of issuance of the Contract Documents shall apply.

C. Codes and standards referenced shall be considered minimum acceptable work.

D. In instances where two or more codes are at variance, the most restrictive requirements shall apply.

E. Nothing on the Drawings nor in the Specifications shall be construed to permit work or materials not conforming to the preceding codes and standards.

F. All work shall also be performed in accordance with the District, State, County or District standards, and local Utility codes.

G. The Contractor shall furnish without extra charge any additional material and labor which may be required for compliance with these codes and standards, even though the work is not explicitly mentioned in the Specifications or shown on the Contract E-Series Drawings.

H. Amperage listed on the single-line Drawings for motors are per NEC Table 430-150 and may not necessarily match that of the equipment supplied. It is the electrical system supplier and Contractor’s responsibility to furnish equipment sized for the motors supplied for this project at no additional cost.

1.03 CONTRACTOR QUALIFICATIONS

A. It is the intent of this Division that the complete responsibility for management and installation of the electrical and instrumentation required for this project be by the Contractor. This responsibility includes, but is not limited to, supervision and coordination of work performed by the System Supplier. Uncertified electricians shall not perform electrical work for which certification is required.

B. Contractor shall submit the proposed Electrical Sub- Contractor and System Supplier with bid documents that will be used on this project.

C. If the Contractor, General Contractor and System supplier listed in bid documents are deemed not qualified by Owner, they will have their bid rejected at the Owner’s sole discretion and the next qualified bidder selected.

D. The Electrical Contractor shall meet the following minimum qualifications:

1. Has a current C-10 Contractor’s License.

2. Has regularly engaged in similar electrical construction for the municipal water and wastewater industry.

3. Has performed work of similar or greater complexity on at least five previous projects.

Page 10 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Electrical
City of Stockton 26 05 00 - 5

4. Has all persons performing work as electricians certified by the California Apprenticeship Council per California Labor Code Section 3099.

1.04 SYSTEM SUPPLIER QUALIFICATIONS
A. General:

1. All switchboard, panels, MCCs, PLC hardware, and PLC programming shall be supplied by one system supplier. All panels and instrumentation listed for Division 16 in all Division 16 appendix Indexes shall be supplied by the same System Supplier. This includes, but not limited to, all work necessary to select, furnish, supervise installation, calibrate, program, and place into operation all transmitters, instruments, controllers, alarm equipment, monitoring equipment, and accessories as specified herein. The system supplier shall not subcontract any portions of the equipment provisioning with the exception of fire and security alarm systems without written approval of Owner.

2. The system supplier shall have an on-staff project engineer with prior experience on similar sized projects. This project engineer shall coordinate the technical aspects of this project and prepare the submittals and drawings. This project engineer’s name, address, and phone number shall be provided within the first week after notice to proceed. The system supplier project engineer shall attend all coordination meetings and be on-site when requested by the Owner’s Resident Engineer.

B. System Suppliers

1. System Suppliers shall submit the information listed herein two weeks prior to bid, and if approved by the Owner, will be listed in a Contract addendum prior to bid.

2. The System Supplier shall submit prove they meet the following minimum qualifications:
a. Has regularly engaged in similar instrumentation systems for the Municipal Water and Wastewater industry.

b. Has successfully performed work of similar or greater complexity on at least five previous projects under one company name which is the present company name.
c. Has been actively engaged in the type of PLC control system, and instrumentation work specified in this Division for a minimum of five years.
d. Has a permanent, fully staffed, and equipped service facility in operation at least six (6) months prior to bid date within 150 miles of project site.

Service facility shall be under same company name as System Supplier and same company shall be staffed with personnel and equipment required to maintain, repair and calibrate the instrumentation system. Subletting warranty to third party is not acceptable.

3. Non pre-qualified System Suppliers shall submit the following detailed information to the Owner for determination of pre-qualification:

Page 11 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Electrical
City of Stockton 26 05 00 - 6

a. Company history.

b. List of five (5) completed projects of similar size and nature for wastewater treatment plants.

i. Provide completion dates of projects.
ii. References of Owner Representative in charge of project, including contact name and telephone number.
c. List of projects in progress.
i. Description of scope of projects.
ii. Dollar amount of projects.

4. Additional information for clarification as requested by the Owner in writing shall be provided by the System Supplier asking for the qualification or qualification will automatically be denied.

5. System Supplier providing financial statements lacking detail or stating that detailed financial records are proprietary will be disqualified as a qualified System Supplier and is grounds alone for disqualification.

6. Any qualification package deemed incomplete or lacking sufficient information to determine qualification will result in System Supplier not being qualified.

7. No reason will be released on why a System Supplier was not qualified.

1.05 CONTRACT DOCUMENTS
A. The Contract Drawings and Specifications are intended to be descriptive of the type of electrical system to be provided; any minor details missing in either shall not relieve the Contractor from the obligations there- under to install in correct detail any and all materials necessary for a complete operational system at no additional cost.

B. The Contract Drawings are generally diagrammatic; exact locations of electrical products shall be verified in the field with the Owner’s Resident Engineer. Except where special details on Drawings are used to illustrate the method of installation of a particular piece or type of equipment or materials, the requirements or descriptions in this Section shall take precedence in the event of conflict.

C. The Contract Electrical elementary, elevation and one-line diagrams are the basis of the electrical system to be provided and are for reference only. It is the Contractor’s responsibility to adjust and make minor revisions to the diagrams as necessary for operational system at no additional cost to the Owner. Additional isolators, relays, wiring, terminal blocks, etc, shall be provided for an operation system at no additional cost to the Owner.

D. Location at facilities of new equipment, inserts, anchors, panels, pull boxes, conduits, stub-ups, and fittings for the electrical system are to be determined by the Contractor and Engineer at time of installation. Contractor shall make minor adjustments to locations of electrical equipment required by conditions and coordination with other trades at no additional cost. Minor adjustments are defined as those adjustments required due to equipment size changes or variations between different equipment suppliers.

Page 12 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Electrical
City of Stockton 26 05 00 - 7

E. The Conduit and Wire Routing Schedule, wire fill, and number of conduits are based on the best information available. It is the Contractor’s responsibility to modify the conduit schedule based upon Shop Drawings for the actual equipment. Such modifications in conduit sizes and numbers of conductors shall be at no additional cost to the Owner and shall be approved by Owner, if such changes are the direct result of the equipment selected by the Contractor. A copy of the Conduit and Wire Routing Schedule and Electrical plans showing conduit routing shall be updated weekly by the Contractor. Progress payments will be withheld if during monthly checks it is found that the contractor fails to maintain the Conduit Schedule updates.

F. Electrical & instrumentation, conduit & wire lengths shown on circuit Drawings are approximate and do not show changes in elevation or vertical risers. The Contractor is responsible for determining actual lengths for bidding and installation purposes.

G. All equipment shall be installed and located so that it can be readily accessed for operation and maintenance. The Engineer reserves the right to require minor changes in location of equipment, without incurring any additional costs. These minor changes are changes which would provide adequate clearance and work areas in front of and around equipment.

H. Where conduits are shown as "home runs" on the Contract Drawings or stated to be furnished, but not explicitly shown as part of the scope of work, the Contractor shall provide all fittings, boxes, wiring, etc., as required for completion of the raceway system in compliance with the NEC and the applicable Specifications in this Section.

I. No changes from the Contract Drawings or Specifications shall be made without written approval of the Engineer. Should there be a need to deviate from the Contract documents, submit written details and reasons for all changes to the Engineer for review within thirty days after the award of the contract.

J. The resolution of conflicting interpretation of the Contract documents shall be as determined by the Engineer.

K. The Contractor shall maintain a separate set of neatly and accurately marked set of Record Documents, consisting of spreadsheets, specifications and full size Electrical (E-Series). These documents are to be used specifically for recording the as built locations and layout of all electrical and instrumentation equipment, routing of raceways, junction and pull boxes, and other diagram or document changes. These Record documents shall be kept up- to-date during the progress of the job, with all "change orders", submittal modifications, and construction changes shown and stamped with “As -Built” at end of job. These Record documents shall not be used for daily construction use and shall not contain any mark-ups that are unrelated to as-built corrections.

1. The following lists the record documents that shall be as-built by Contractor:
a. E- Series Drawings.
b. Panelboard schedules.
c. Conduit and Wire Routing Schedule.
d. Lighting Schedule.

3. Record documents shall be kept current weekly with all "change orders", submittal modifications, and construction changes shown. Record Documents shall be subject to the inspection by the Engineer at all times, progress payments or portions thereof may be withheld if Record Documents are not accurate or current.

Page 13 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Electrical
City of Stockton 26 05 00 - 8

4. When documents are changed, they shall be marked with erasable colored pencils using the following coloring scheme:
a. Additions - red.
b. Deletions - green.
c. Comments - blue.
d. Dimensions - black.

5. Show the following on the Electrical (E- Series) Record Contract Drawings by dimension from readily obtained base lines:

a. Exact location, type and function of electrical and instrumentation equipment and devices.
b. Precise routing and locations of underground conduits, duct banks, vaults, pullboxes, junction boxes, etc. that make-up the raceway system. c. Show the dimensions, location and routing of electrical work which will become permanently concealed.
d. Show complete routing and sizing of any significant revisions to the systems shown.

6. Prior to acceptance of the work, the Contractor shall deliver to the Engineer one set of record full -size Electrical Record Contract Drawings and spreadsheets neatly marked accurately showing the information required above.

1.06 SUBMITTAL AND DRAWING REQUIREMENTS

A. Provide electrical and instrumentation submittals per Section 260503 - Electrical and Instrumentation Submittal Requirements and Submittals.

1.07 COORDINATION
A. The Contractor shall coordinate the electrical work with the other trades, code authorities, utilities, and the Engineer, with due regard to their work, towards promotion of rapid completion of the project. If any cooperative work must be altered due to lack of proper supervision of such, or failure to make proper provisions, then the Contractor shall bear expense of such changes as necessary to be made in the work of others.

B. The Contractor shall examine the architectural, mechanical, structural, electrical, and instrumentation equipment provided under other Sections of this Contract in order to determine the exact routing and final terminations for all conduits and cables. The exact locations and routing of cables and conduits shall be governed by structural conditions, physical interferences, and the physical location of wire terminations on equipment.

Conduits shall be stubbed up as close as possible to equipment terminals.

C. Manufacturer's directions and instructions shall be followed in all cases when they have more restrictive requirements than that shown on the Contract Drawings or have stipulations in order to meet warranty requirements.

Page 14 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Electrical
City of Stockton 26 05 00 - 9

1.08 SUPERVISION
A. The Contractor shall schedule all activities, manage all technical aspects of the project, coordinate submittal and Drawings, and attend all project meetings associated with this Section.

B. The Contractor shall supervise all work in this Section, including the Contractor’s general construction work, and System Supplier’s work, from the beginning to completion and final acceptance.

C. The Contractor shall supervise and coordinate all work in this Section to insure that each phase of the project, submittal, delivery, installation, and acceptance testing, warranty, etc., is completed within the allowable scheduled time frames.

D. The Contractor shall be responsible for obtaining, preparing, completing, and furnishing all paper work for this Section including that of the Contractor and the System Supplier, which shall include transmittals, submittal, forms, documents, manuals, instructions, and procedures.

E. Electrical Construction Supervision:

1. Prior to the start of any project site installation, the Contractor shall provide the Owner with an expected manpower schedule as well as a list of applicable job site supervision personnel, their scheduled job site appearance, and the expected duration of their presence on the job site. Include in this manpower schedule the calculation of average manhour per month for the duration of electrical labor phase.

2. When the Electrical Labor exceeds an average of 2,000 man -hours/month the Contractor shall have an office clerk on site for the duration of the construction work to order, follow up and receive materials, handle construction payroll, maintain the Construction Documents, and handle or assist the working foreman/superintendent with responsibility not directly related to the installation of the electrical equipment.

3. The Contractor shall have a dedicated Project Manager in addition to the Office Clerk described above, on site for the duration of the construction work. The Project Manager shall have complete authority and responsibility for carrying out all aspects of the Contract with the Owner.

4. The Contractor shall provide a foreman for each six (6) installation labor electricians. A Job Site Superintendent shall be provided at the discretion of the Contractor unless the project falls behind schedule. If the project falls behind schedule, the Owner can direct the Contractor to provide a non -working Superintendent who must remain with the project a minimum of the next two (2) project schedule deadlines.

1.09 INSPECTIONS
A. All work or materials covered by the Contract documents shall be subject to inspection at any and all times by the Engineer. If any material does not conform to the Contract documents, or does not have an "approved" or "approved as noted" submittal status; then the Contractor shall, within three days after being notified by the Engineer, remove the unacceptable material from the premises; and if said material has been installed, the entire expense of removing and replacing same, including any

Page 15 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Electrical
City of Stockton 26 05 00 - 10

cutting and patching that may be necessary, shall be borne by the Contractor.

B. Work shall not be closed in or covered over before inspection and approval by the Owner’s Resident Engineer. All costs associated with uncovering and making repairs where noninspected work has been performed shall be borne by the Contractor.

C. The Contractor shall cooperate with the Owner and provide assistance for the inspection of the electrical system under this Contract. The Contractor shall remove covers, provide access, operate equipment, and perform other reasonable work which, in the opinion of the Engineer, will be necessary to determine the quality and adequacy of the work.

D. Before request for final inspection is made, the Contractor shall submit to the Owner in writing, a statement that the Contractor has made his own thorough inspection of the entire project enumerating punch list items not complete and that the installation and testing is complete and in conformance with the requirements of this Division.

E. The Owner may arrange for a facility inspection by Cal -OSHA Consultation Service at any time.

The Contractor shall make the necessary corrections to bring all work in conformance with Cal - OSHA requirements, all at no additional cost to the Owner.

F. Contractor will be Responsible for any Additional Cost for Overtime, Weekend Overtime or Differential Time, Expenses for Inspection of Defective Work that has to be Reinspected.

1.10 JOB CONDITIONS
A. The Contractor shall make all arrangements and pay the costs thereof for temporary services required during construction of the project, such as temporary electrical power and telephone service. Upon completion of the project, remove all temporary services, equipment, material, and wiring from the site as the property of the Contractor.

B. The Contractor shall provide adequate protection for all equipment and materials during shipment, storage, and construction. Equipment and materials shall be completely covered with two layers of plastic and set on cribbing six inches above grade so that they are protected from weather, wind, dust, water, or construction operations. Equipment shall not be stored outdoors without the approval of the Owner. Where equipment is stored or installed in moist areas, such as unheated buildings, provide an acceptable means to prevent moisture damage, such as a uniformly distributed heat source to prevent condensation.

C. The elevation of the project site is approximately 870 feet above sea level. All equipment shall be de-rated as recommended by the manufacturer or in accordance with ANSI C37.30.

D. The normal, unconditioned ambient temperature range of the job site will vary between10° to 110 °F. All equipment shall be rated to operate at continuous full load under these temperature ranges.

Any additional provisions for cooling or heating shall be provided to meet these requirements at no additional cost.

1.11 OPERATION AND MAINTENANCE MANUALS
A. Operation and maintenance manuals covering instructions and maintenance on each type of equipment shall be furnished per Section 26 01 26 - Electrical and Instrumentation Operations and Maintenance Data.

Page 16 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Electrical
City of Stockton 26 05 00 - 11

PART 2 MATERIALS

2.01 QUALITY
A. It is the intent of the Contract Specifications and Drawings to secure the highest quality in all materials and equipment in order to facilitate operation and maintenance of the facility. All equipment and materials shall be new and the products of reputable suppliers have adequate experience in the manufacture of these particular items. For uniformity, only one manufacturer will be accepted for each type of product. Provide the manufacturer’s latest design that conforms to these Specifications.

B. All equipment shall be designed for the service intended and shall be of rugged construction, of ample strength for all stresses which may occur during fabrication, transportation, erection, and continuous or intermittent operation. All equipment shall be adequately stayed, braced, and anchored, and shall be installed in a neat and workmanlike manner. Appearance and safety, as well as utility, shall be given consideration in the design of details. All components and devices installed shall be standard items of industrial grade, unless otherwise noted, and shall be of sturdy and durable construction suitable for long, trouble -free service. Light duty, fragile, and competitive grade devices of doubtful durability shall not be used.

C. Products that are specified by manufacturer, trade name, or catalog number, establish a standard of quality and do not prohibit the use of approved equal of other manufacturers. However, all provided products specified or not, must be favorably reviewed and approved by the Engineer prior to installation.

D. Underwriter’s Laboratories (UL) listing is required for all substituted equipment when such a listing is available for the first named equipment.

E. When required by the Contract Specifications or requested by the Engineer, the Contractor shall submit equipment or material samples for test or evaluation. The samples shall be furnished with information as to their source and prepared in such quantities and sizes as may be required for proper examination and testing, with all freight and charges prepaid. All samples shall be submitted before shipment of the equipment or material to the job site and in ample time to permit the making of proper tests, analyses, examinations, rejections, and resubmissions before incorporated into the work.

F. It is the System Supplier’s responsibility to visit jobsite to collect and document existing equipment MCC device part numbers in order for all similar called out new equipment to match existing.

2.02 COMPONENTS
A. SWITCHES AND LIGHTS
B. Relays and Timers:

1. General: Relays and timers shall be provided with N.O. or N.C. contacts as shown on the Contract Drawings. All spare contacts shown shall be provided. A minimum of two isolated form C contacts, shall be provided on each timer or relay. Contacts shall be rated 10 amps minimum at 120 VAC, 60 Hz unless otherwise stated. Supply power or

Page 17 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Electrical
City of Stockton 26 05 00 - 12

coil voltage shall be 120 VAC unless otherwise shown on the Contract Drawings or when relay is utilized in 24VDC control circuits. Relays and timers shall be designed for continuous duty. All relays shall be UL listed. The following is a summary of abbreviations associated with relays and timers:
a. CR- control relay
b. ISR - intrinsic safe relay
c. PFR - power fail relay
d. TR - time delay relay
e. TDOE - time delay on energization
f. TDOD - time delay on dropout

2. Control relays (CR) shall be plug-in type with clear see-through sealed or enclosed housing to exclude dust. Contact material shall be silver cadmium oxide. Relay shall be rated for 110% of rated voltage and have a frequency response of 1800 operations per hour. Sockets for plug -in relays shall be standard industrial 8 or 11 blade type with barrier pressure screw terminals. Provide relay energized neon lamp or LED (inside relay case). Provide IDEC type RH, Potter and Brumfield, or approved equal.

3. Intrinsic safe relay (ISR) shall be Warrick Series 17AIEO to operate from 120VAC power with direct mode of operation operate. ISR shall be solid state, FM approved for use in Class I, Division I atmospheres with internal surge suppression. Contact rating shall be 8A and have both N.O. and N.C. contacts. Secondary voltage shall be 13VAC. ISR shall have latch and un -latch inputs for use with a two float control system for differential level control. Sensitivity shall be 10,000 ohms. ISR shall be rated for Class 1, Division 2 sewage wetwell and equalization tank applications.

4. The power fail monitor (PFR) shall continuously monitor the three phases for power loss, over/under voltage, phase loss, phase unbalance and phase reversal. The power fail monitor shall have a drop- out voltage adjustment and status indicating LEDs. Monitor shall have adjustable delay-on-make and delay-on-break timers. Fault delay shall be adjustable from 1 to 15 seconds. Monitor shall have 32 character LCD display with green back light, and 5 buttons. All adjustable timers shall be made through the display and buttons. All parameters shall be stored in permanent non-volatile memory. Power fail monitor shall be 3 phase multiple function Watsco EAC8002 series Linebacker Phase Protector, to match District standard unit. All parameters shall be recorded on data sheets.

5. Time delay relays (TR) shall be solid state plug-in relays with a timer adjustable over eight (8) multi-time range 1 second to 10 minutes and from 1 minute to 10 hours unless other ranges are indicated or required. Provide LED timer energized indicator lamps. Timer shall have +/- 0.25% repeat accuracy. Sockets for plug-in timers shall be standard industrial type blade 8 or 11 pin with barriered pressure screw terminals. Time delay relays shall be IDEC RTE, Potter and Brumfield, or approved equal.

6. Provide and install all moisture or temperature protection relays when required for equipment or motor/pump warranty conditions including any additional conduits for low voltage signal wiring. Submitted drawings shall include the wiring and terminations for all of these relays.

C. Circuit Breakers:

Page 18 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Electrical
City of Stockton 26 05 00 - 13

1. Circuit breakers shall be of the indicating type, providing ON, OFF and TRIPPED positions of the operating handle. Circuit breakers shall be quick -make, quick- break, with a thermal-magnetic (TM) action, except when protecting motor feeders where motor circuit protector (MCP) breakers with adjustable magnetic trip shall be used.

Circuit breakers shall be the bolted on type. The use of tandem or dual circuit breakers in a normal single -pole space to provide the number of poles or spaces specified are not acceptable. All multiple-pole circuit breakers shall be designed so that an overload on one pole automatically causes all poles to open. Circuit breakers and motor circuit protectors shall be manufactured by GE, Cutler-Hammer, ITE, or approved equal.

2. Breakers shall be sized and have a minimum interrupting capacity as shown on Drawings and as required for the supplied equipment.

3. Breakers requiring GF trip on E -Series Drawings shall be provided with breakers with integral ground fault trip.

4. Thermal magnetic circuit breakers with frames 250A and above shall be provided with removable interchangeable trip units.

5. Breaker for HVAC equipment shall have HACR rating.

6. All breakers shall be supplied with the correct sized copper only lu gs for wire sizes as listed in “Conduit & Wire Routing Schedule”. Provide larger frame breaker or lug adapters as necessary when connecting to the listed oversized wire.

D. Motor Starters:

1. Motor starters (M) shall be Valziable Frequency Drivers as shown on the Drawings.

NEMA sizes shall be as required for the horsepower of the supplied equipment.

Contactors shall be UL rated and listed.

2. Auxiliary contacts shall be provided as shown on the Drawings or as required. Each motor starter shall be furnished with a minimum of two spare auxiliary contacts in excess from those shown to be used. Auxiliary contacts shall be convertible, in the field, from normally open to normally closed, or vice versa.

3. Starters shall have adjustable overload relays. Adjustable overload relays shall be adjustable for trip point and for automatic or manual reset. Each overload shall be ambient compensated with a visible trip indicator. Each overload shall be ambient compensated and shall trip on 600% of full load current in less than 6 seconds. Each overload relay shall have a test trip pushbutton built-in and an adjustable calibrated trip with indicating dial. Three -phase starters shall have 3 overload relays. Each overload relay shall have a normally closed holding contact and a normally open isolated contact for overload shutdown.

E. Control Power Transformer:

1. Control power transformer (CPT) shall be provided with a time -delay, slow -blow secondary fuse rated to protect the transformer and interrupt 10,000 amperes at 120VAC.

Two primary fuses for interrupt amperes shown on Contract Drawings shall be provided.

Transformer size minimum ratings shall be as shown on Contract E -Series Drawings.

When size is not shown on E -series Contract Drawings, then the following lists the

Page 19 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Electrical
City of Stockton 26 05 00 - 14

minimum control power transformer per NEMA Starter size or VFD/Soft Starter size:

CONTACTOR CTRL PWR XFMR

NEMA SIZE VA RATING

STARTER
SIZE 00 150
SIZE 0 150
SIZE 1 150
SIZE 2 150
SIZE 3 250
SIZE 4 250
SIZE 5 250

2. The MCC supplier shall increase the CPT size by the VA rating of the motor heater when motors have heaters.

F. Elapsed Time Meters:

1. Elapsed time meters (ETM) for general use shall be nonresettable with 0.0 to 99,999.9 hour readout, permanently lubricated synchronous motor drive, nominal 2-1/2” circular two- hole surface front panel mount housing, screw terminals, and rated at 120 VAC, at 60 Hz.

Elapsed time meters shall be Stemco-Engler Series, 710-0002, Yokogawa, or approved equal.

2.03 ELECTRICAL ENCLOSURES AND BOXES
A. Enclosures to be NEMA rated per Indexes with fast access door latches. Enclosure construction shall be 14 gauge minimum with continuously welded seams. Outer door shall have provisions for locking enclosure with standard padlock. Provide white backpan in each box. Provide thermoplastic data pocket mounted on inside door. Provide enclosures with accessories consisting of breaker to disconnect incoming power, padlockable disconnect for breakers used in circuits above 120VAC, heater, fan, removable metal filters, louvers, and thermostats. Enclosure shall be Hoffman, Circle AW, or approved equal.

2.04 MOTOR CONTROL PANELS
A. Provide motor control panels with padlockable main disconnect, motor circuit protector (MCP), auxiliary contacts for remote SCADA monitoring, control power transformer, elapsed time meter (ETM), HOA selector switch, reset pushbutton, starter with motor overloads, terminal blocks, relays, and interlocks as shown on Contract Drawings.

B. Motor controls shall be mounted on a backpan and installed in a NEMA rated enclosure.

Enclosure shall have a padlockable disconnect switch for locking out pump operation and controls.

C. Motor control panel shall be Siemens, or approved equal.

2.05 SAFETY LOCKOUTS
A. Safety lockouts per subsection 3.08.

Page 20 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Electrical
City of Stockton 26 05 00 - 15

PART 3 EXECUTION

3.01 WORKMANSHIP
A. All work in this Section shall conform to the codes and standards outlined herein.

B. The Contractor shall employ personnel that are skilled and experienced in the installation and connection of all elements, equipment, devices, instruments, accessories, and assemblies.

All installation labor shall be performed by qualified personnel who have had experience on similar projects. Provide first class workmanship for all installations.

C. The Contractor shall ensure that all equipment and materials fit properly in his installations.

D. The Contractor shall perform any required work to correct improper installations at no additional expense to the Owner.

E. The Engineer reserves the right to halt any work that is found to be substandard or being installed by unqualified personnel.

F. All cutting and notching shall be laid out carefully in advance. Do not notch any structural member or building surface without specific approval from the Engineer. Carefully carry out any cutting, channeling, chasing, or drilling of floors, walls, partitions, ceilings, paving, or other surfaces required for the installation, support, or anchorage of conduit, raceways, or other electrical materials and equipment. Following such work, restore surfaces neatly to new condition using skilled craftsmen of the trades involved. Refinish damaged surfaces to new condition using skilled craftsmen of the trades involved at no additional cost to the Owner.

G. Keep the premises free from accumulation of waste material or rubbish on a daily basis. Upon daily completion of work, remove materials, scraps, and debris from the premises and from the interior and exterior of all devices and equipment.

H. All equipment installed by the Contractor shall be in accordance with the Drawings and the manufacturer's recommendations and instructions and shall operate to the Engineer's satisfaction. Follow all manufacturer’s instructions for handling, receiving, installation, and pre-check requirements prior to energization. After energization, follow manufacturer’s instructions for programming, set-up and calibration of equipment. The Contractor shall be responsible for, and shall correct by repair or replacement, at his own expense, equipment which, in the opinion of the Engineer, has been caused by faulty mechanical or electrical assembly by the Contractor.

Necessary tests to demonstrate that the electrical and mechanical operation of the equipment is satisfactory and meets the requirements of these Specifications shall be made by the Contractor at no additional cost to the Owner.

I. The Contractor shall vacuum clean the interior of all motor control centers, panelboards, junction boxes and other enclosures supplied under this project containing electrical equipment to remove all dirt, metal chips, stripped insulation, etc., from the enclosure. This cleaning shall be done prior to energizing the device initially and a second time immediately prior to the final acceptance inspection.

3.02 CONSTRUCTION METHODS, GENERAL

Page 21 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Electrical
City of Stockton 26 05 00 - 16

A. All wiring shall be neatly bundled and laced with plastic tie -wraps, anchored in place by screw attached retainer. Where space is available, such as in electrical cabinets, all wiring shall be run in slotted plastic wireways or channels with dust covers. Wireways or channels shall be sized such that the wire fill does not exceed 50%. Wires carrying 100 volts and above shall be physically separated from lower voltage wiring by using separate bundles or wireways with sufficient distance to minimize the introduction of noise, crossing only at 90 degree angles. Tie-wraps shall be T&B TY- RAP’s, Panduit, or approved equal.

B. Where wiring crosses hinged surfaces, provide a "U" shaped hinge loop protected by plastic spiral wrap. The hinge loop shall be of sufficient length to permit opening and closing the door without stressing any of the terminations or connections.

C. Wireways, retainers, and other devices shall be screw-mounted with round-head 316 stainless steel screws. Glue or sticky back attachment of any type or style shall not be used.

D. All devices and wiring shall be installed and permanently labeled and secured in accordance with Section 26 05 02 and Section 26 28 13.

E. All components associated with a particular compartment’s or enclosure's function shall be mounted in that compartment or enclosure.

F. Spacing and clearance of components shall be in accordance with UL, JIC, and NEC standards.

G. Wires shall not be spliced except where shown. Devices with pigtails, except lighting fixtures, shall be connected at terminal blocks. Equipment delivered with spliced wires shall be rejected and the Contractor required to replace all such wiring, at no additional cost to the Owner.

H. Where splices are allowed or approved by the Engineer they shall conform with the following:

1. Splices of #10 and smaller, including fixture taps, shall be made with nylon self- insulated twist on wire joints; T&B “Piggys”, Panduit, or approved equal. Twist shall be UL listed for service voltage.

2. Splices of #8 and larger shall be double crimped splices, or approved equal, insulated with heat shrink tubing, or approved equal.

3. Splices in underground pullboxes shall be insulated and moisture sealed with 3M “Scotchcast” cast fast curing epoxy powdered resin splice kits. Kits used shall have a date marking for shelf life that is not expired. Kit shall be UL listed for electrical insulating systems.

4. Wire splicing devices shall be sized according to manufacturer's recommendations.

5. Tape on splices shall not be allowed.

6. Splices for motor leads shall be made with T&B MSC series splice kit, or approved equal.

I. Tapes shall conform to the requirements of UL 510 and be rated: 105 °C, 600V, flame retardant, hot and cold weather resistant. Vinyl plastic electrical tape shall be 7 mile black. Phase tape shall be 7 mil vinyl plastic, color coded as specified. Electrical insulation putty shall be rubber based,

Page 22 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Electrical
City of Stockton 26 05 00 - 17

elastic putty in tape form. Varnished cambric shall not be used.

J. Connections to terminals shall be as follows:

1. Use connector or socket type terminals furnished with component.

2. Connections to binding post screw, stud, or bolt use:
a. For #10 and smaller wire, T&B “STA -KON”, Buchanan “Termend”, or approved equal self -insulated locking forked tongue lug, de -burred, electrotin plating with flat bottom box.
b. For #8 to #4/0 wire, T&B “Locktite”, Burndy QA lug of shape best suited with code copper conductor (for 600V).

3. Use ratchet type crimping tool which does not release until proper crimp pressure has been applied.

4. Connections for all terminals shall be made with insulation stripped per manufacturer's instructions.

K. Equipment shall be wired and piped by the manufacturer or supplier. Major field modifications or changes are not allowed without the written "change order" authority by the Engineer. When field changes are made, the components, materials, wiring, labeling, and construction methods shall be identical to that of the original supplied equipment. Contractor's cost to replace or rework the equipment to match original manufacturer or supplier methods shall be done at no additional cost to the Owner.

L. Mating fittings, bulkhead fittings, plugs, connectors, etc., required to field interface to the equipment and panels shall be provided by the supplier when the equipment is delivered.

M. All electrical and instrumentation Drawings associated with the equipment shall be provided with the equipment when it is delivered to the job site. Drawings for each piece of equipment shall be placed in clear plastic packets of sufficient strength that will not tear or stretch from drawing removal and insertion.

N. All lugs shall be copper. No aluminum lugs shall be allowed.

3.03 EQUIPMENT FABRICATION, GENERAL
A. Panel cutouts for devices (i.e., indicating lights, switches) shall be cut, punched, or drilled and smoothly finished with rounded edges. Exposed metal from cutouts that are made after the final paint finish has been applied shall be touched up with a matching paint prior to installing device. Do not paint nameplates, labels, tags, switches, receptacles, conductors, etc.

B. All doors shall be fully gasketed with nonshrinkable, water and flame resistant material.

C. Bolts and screws for mounting devices on doors shall be as specified by the manufacturer, otherwise they shall have a flush head which blends into the device or door surface. No bolt or screw holding nuts shall be used on the external surface of the door.

D. No fastening devices shall project through the outer surfaces of equipment.

Page 23 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Electrical
City of Stockton 26 05 00 - 18

E. Each component within the equipment shall be securely mounted on an interior subpanel or backpan and arranged for easy servicing, such that all adjustments and component removal can be accomplished without removing or disturbing other components. Mounting bolts and screws shall be front located for easy access and removal without special tools. Access behind the sub panel or backpan shall not be required for removing any component.

F. A ground bus shall be provided in each enclosure or cabinet. It shall have provisions for connecting a minimum of ten grounding conductors. Screw type lugs shall be provided for connection of grounding conductors. All grounding conductors shall be sized as shown on plans or in accordance with NEC Table 250- 122, whichever is larger.

G. Minimum wire bending space at terminals and minimum width of wiring gutters shall comply with NEC Tables 312-6 (A) and (B).

H. Wire sizes shall not be installed smaller than those shown in NEC Article 310 for each circuit amperage rating.

I. Future device and component mounting space shall be provided on the door, backpan, and subpanel where detailed on the Drawings. Where no detail is shown, provide a minimum of 15 percent usable future space.

J. Doors shall swing freely a minimum of 90° and close with proper alignment.

K. All control, power, and signal wires inside enclosures shall be run in separate plastic wireways.

Wireways shall not be filled over 50% capacity.

3.04 DELIVERY

A. Contractor shall inspect each electrical and instrumentation item delivered to the jobsite.

B. Contractor shall unpack each item for inspection within two (2) days of arrival.

C. Complete written inventory shall be produced by Contractor and submitted to Owner within (2) days after arrival on jobsite for record keeping prior to any payment for the item.

3.05 DAMAGED PRODUCTS
A. Damage products will not be accepted. All damaged products shall be replaced with new products.

3.06 FASTENERS
A. Fasteners for securing equipment to walls, floors, and the like shall be stainless steel. The minimum size fastener shall be 3/8-inch diameter. Layout to maintain headroom, neat mechanical appearance, and to support equipment loads required
B. Anchor Methods:

1. Hollow Masonry: Sleeve type anchors.

2. Solid Masonry: Sleeve type anchors or epoxy anchors bolts.

Page 24 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Electrical
City of Stockton 26 05 00 - 19

3. Metal Surfaces: Machine screws, bolts, or welded studs.

4. Concrete Surfaces: Wedge or expansion anchors.

5. Structural Steel: Right angle, parallel and edge type rigid metal clamps. Do not weld or drill structural steel.

C. Equipment Mounting:

1. The Contractor shall be responsible for furnishing and setting all anchor bolts required to install his equipment.

2. Electrical equipment shall be unistrut “stand off” mounted a minimum of ½ - inch from the wall in a manner so that the rear of the equipment is freely exposed to air circulation. Unistrut, anchors and fasteners shall be 316 stainless steel in NEMA 4X areas and galvanized in non- NEMA 4X areas unless called out specifically in details.

3. All equipment enclosures shall be of the NEMA classification noted on the electrical plan Drawings for the area in which the device will be mounted.

4. Reinforced concrete pad with stainless steel anchor bolts shall be provided for each electrical freestanding equipment.

D. Dissimilar metals such as aluminum, stainless steel, steel, galvanized steel between enclosures, devices, etc. and mounting surfaces shall be isolated from each other using insulated tape or nonmetal spacers. Tape and spacers used shall be specifically manufactured for this application.

3.07 INSTALLATION, GENERAL
A. System:

1. Install all products per manufacturer's recommendations and the Drawings.

2. Provide relays, signal converters, isolators, boosters, and other miscellaneous devices as required.

3. Change normally open contacts to normally closed contacts or visa versa.

4. Adding additional relays to provide more contacts as necessary.

5. Keep a copy of the manufacturer’s installation instructions on the jobsite available for review at all times prior to and during the installation of the associated equipment.

B. Panels and Enclosures:

1. Install panels and enclosures at the location shown on the Drawings or approved by the Engineer.

2. Install level and plumb.

3. Seal all enclosure openings to prevent entrance of insects and rodents.

Page 25 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Electrical
City of Stockton 26 05 00 - 20

4. All conduits entering outdoor panels and enclosures shall use watertight hubs. These hubs shall be located on sides or bottom only. Top entry of outdoor panels or enclosures is not allowed unless specifically shown on plans.

5. Clearance about electrical equipment shall meet the minimum requirements of NEC 110-26 C. Wiring, Grounding, and Shielding:

1. Wiring inside and outside equipment shall be installed per Section 26 28 13.

2. It is important to observe good grounding and shielding practices in the generally noisy environment in this application. The shield of shielded cables shall be terminated to ground at one end only, the originating panel. The shield at the other end shall be encased in an insulated material to isolate it from ground.

3. Special cables shall be provided when required by manufacturer or necessary to correct noise or distortion interference at no additional cost to Owner.

4. Field wiring shall not begin until interconnection drawings have been submitted by the Contractor and approved by the Engineer, per Section 26 05 03.

D. Cutting and Patching:

1. The Contractor shall do all cutting and patching required to install his work. Any cutting which may impair the structure shall require prior approval by the Engineer. Cutting and patching shall be done only by skilled labor of the respective trades. All surfaces shall be restored to their original condition after cutting and patching.

E. Seals:

1. Seal around all conduits, wires, and cables penetrating between walls, ceilings, and floors in all buildings with a fire stop material. Seal shall be made at both ends of the conduit with a fire stop putty. Seal shall have a minimum two hour rating. Fire stop sealing shall be International Protective Coatings Flamesafe, or approved equal.

2. Seal around conduits entering outside to inside structures and around bottom of free standing enclosures to maintain watertight integrity of structure.

3. Place conduit seal inside each underground conduit riser into panels and enclosures to prevent entrance of insects and rodents.

F. Cleaning and Touch up:

1. Prior to startup and at the completion of the work prior to final acceptance, all parts of the installation, including all equipment, exposed conduit, devices, and fittings shall be cleaned and given touch up by Contractor as follows:
a. Remove all grease and metal cuttings.
b. Any discoloration or other damage to parts of the building, the finish, or the furnishings, shall be repaired.

Page 26 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Electrical
City of Stockton 26 05 00 - 21

c. Thoroughly clean any of his exposed work requiring same.

d. Vacuum and clean the inside of all MCC and electrical and instrumentation enclosures.

e. Clean all above and below ground pull boxes, junction boxes, and vaults from all foreign debris prior to final acceptance. f. Paint all scratched or blemished surfaces with the necessary coats of quick drying paint to match adjacent color, texture, and thickness. This shall include all prime painted electrical equipment, including enclosures, panels, poles, boxes, devices, etc.

3.08 SAFETY LOCKOUTS
A. Contractor shall provide safety lockout tags on the breakers for all MCCs and Panelboards and other electrical enclosures. Safety tags shall not be the same as t hose used by the Owner. All padlocks used for this purpose shall be keyed differently from any of the Owner’s padlocks. Padlocks shall remain in place by the Contractor until operation of the portion of work is turned over to the Owner with the responsibilities noted on the acceptance form.

B. The following is the procedure for transferring each portion of work over to the Owner prior to completion of the entire project:

1. Contractor shall inform the Owner when a portion of the work is complete, ready for inspection and available to be placed into operation.

2. The Owner will schedule the inspection and substantiate that the work is complete and operational.

3. The Contractor will correct any deficiencies.

4. The Owner will prepare a Partial Utilization form in which that portion of the project will be turned over the Owner with the responsibilities noted on the acceptance form.

The Contractor then shall remove his safety lockouts and tags.

C. Safety lockout tags shall be rigid vinyl with write-on surface and brass grommet. Safety tags shall be secured in place with cord of sufficient strength to prevent accidental removal or displacement.

Lockout shall meet OSHA standard 1910.147 requirements. Safety lockouts shall be Panduit write - on Safety Tags, model PVT-98, or approved equal.

3.09 WARRANTY
A. The Contractor shall warrant all electrical and instrumentation equipment and software programming supplied under this Division 16 for a period of one (1) year from date of final acceptance.

Standard published warranties of equipment which exceed the preceding specified length of time shall be honored by the manufacturer or supplier.

B. The Contractor shall provide all labor and material to troubleshoot, replace, or repair any hardware or software that fails or operates improperly during the warranty period, at no additional cost to the Owner.

Page 27 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Electrical
City of Stockton 26 05 00 - 22

C. The System Supplier shall have a staff of experienced personnel available to provide service on a two (2) working day notice during the warranty period. Such personnel shall be capable of fully testing, programming and diagnosing the hardware and software delivered; and of implementing corrective measures.

D. If the System Supplier fails to respond in two (2) working days, the Owner at its option will proceed to have the warranty work completed by other resources; the total cost for these other resources shall be reimbursed in full by the Contractor. The use of other resources, as stated above, shall not change or relieve the Contractor or supplier from fulfilling the remainder of the warranty requirements.

E. Each time the System Supplier's repair person responds to a system malfunction during the warranty period, he or she must contact the designated Owner maintenance supervisor for scheduling of the work, access to the jobsite, and permission to make repairs. Operation of facilities necessary to test equipment shall only be performed by or under the direction of the Owner Staff. The Owner reserves the right at its sole discretion to deny operations requested by the System Supplier.

A written description of all warranty work performed shall be documented on a field service report to be given to Owner prior to the repair person leaving job site each day. This field service report shall detail and clearly state problem, corrective actions taken, additional work that needs to be done, data, repair person name and company.

F. Prior to "final acceptance", the Contractor shall furnish to the Engineer a listing of warranty information for all manufacturers of materials, instruments, and equipment used on the project.

The listing shall include the following:

1. Manufacturer's name, service contact person, phone number, and address.

2. Material and equipment description, equipment number, part number, serial number, and model number.

3. Manufacturer’s warranty expiration date.

3.10 FINAL ACCEPTANCE
A. Final acceptance will be given by the Owner after the equipment has passed the "final acceptance trial period", each deficiency has been corrected, final documentation has been provided, and all the requirements of design documents have been fulfilled.

B. Upon completion of the project, prior to final acceptance, remove all temporary services, equipment, material, and wiring from the site.

C. At the end of the project, following the completion of the field tests, and prior to final acceptance, the Supplier shall provide the following to the Owner:

1. A listing of warranty information.

2. Each "operation and maintenance" manual shall be modified or supplemented by the Supplier to reflect all field changes and as-built conditions.

D. Prior to final acceptance submit each key with matching duplicate. Wire all keys for each lock

Page 28 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Electrical
City of Stockton 26 05 00 - 23

securely tog sether. Tag and plainly mark with lock number or equipment identification, and indicate physical location, such as panel or switch number.

END OF SECTION

Page 29 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Supporting Devices
City of Stockton 26 05 01 - 1

SECTION 26 05 01

SUPPORTING DEVICES

1PART 1 GENERAL

1.01 SCOPE OF WORK
A. The Contractor shall install, ready for use, the supporting devices as specified herein. This document describes the function and operation of the system and particular components, but does not necessarily describe all necessary devices. All components and devices shall be furnished and installed as required to provide a complete operable and reliable system for accomplishing the functions and meeting the performance set forth hereinafter at no additional cost to the Owner.

B. Furnish all required labor, materials, project equipment, tools, construction equipment, safety equipment, transportation, incidentals, and services to provide supporting devices as shown on the Drawings, included in these Specifications, or required for fully operating facilities.

C. Work includes that specified in Division 26 05 00.

D. The supporting devices scope of work includes:

1. Provide all necessary hardware, supporting devices, and devices to support and align raceways, cabinets, boxes, fixtures, and other appurtenances in an approved manner and as herein specified.

2. The location of field control stations on Drawings are tentative. During construction, the Owner will direct the Contractor, the exact position and direction of orientation at no additional cost to the Owner.

1.02 SUBMITTALS AND DRAWINGS
A. Provide Submittals and Drawings as specified in Section 26 05 03.

B. Submit detailed fabrication Drawings showing material of construction for each type of support.

C. Submit dimensioned supporting device Drawings for each type of enclosure, instrument, and panel. The mounting tab locations for device mounting shall be clearly shown and dimensioned.

PART 2 MATERIALS

2.01 SUPPORTING DEVICES
A. General: Materials, and installation shall meet all requirements of the NEC, and meet the minimum following Specifications.

Page 30 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Supporting Devices
City of Stockton 26 05 01 - 2

1. Inserts, hangers, brackets and miscellaneous supports for electrical equipment and conduits must be designed with minimum safety factor of 4, based on ultimate strength of material used. For empty conduits, include weight of 4 Type XHHW copper wires of maximum permissible size.

2. Secure hangers, brackets, conduit straps, supports and electrical equipment as specified in Electrical Section 26 05 00 - Fasteners.

3. Power driven or velocity driven inserts may be used where their use does not affect finished appearance of work, but may not be used on structures in tension. They may not be used in prestressed slabs, beams, purlins, or in precast members.

4. All concrete embedded bolts shall be 316 stainless steel.

5. Support channels steel shall conform to the requirements of ASTM A570 and be nominal 1 5/8" x 1 5/8". One side of the channel shall have a continuous slot with in-turned lips. Double strut shall be two of these welded back to back.

B. Mounting, support, or bracing bolts shall not be used as an attachment point for ground conductors. Attachment of the grounding conductor to equipment or enclosures shall be by connectors specifically provided for grounding.

C. Conduit Supports:

1. Single Conduit Hangers: 3/8" minimum diameter stainless steel rod or anchor.

2. Trapeze Hangers: Channel with 1/2" minimum diameter stainless steel rods.

3. Supports for Indoors in Non-Corrosive/Dry Locations:

a. Hangers, channels, clamps, supports and rods; galvanized steel. b. Conduit straps and single hole clamps; galvanized.
c. Steel bolts, screws, nuts and washers; galvanized.
d. Paint surfaces to match adjacent finishes.

4. Supports for Outdoors, Corrosive/Wet, and NEMA 4X Locations:

a. Hangers, channels, clamps, supports and rods; 316 stainless steel.

Fiberglass may be used when approved in writing by Engineer. b. Conduit straps and single hole clamps; 316 stainless steel or PVC -coated galvanized steel with PVC coated backplates.
c. Bolts, screws, nuts and washers; shall be 316 stainless steel. 5. All supports shall be braced at 10-foot intervals, minimum.

D. Equipment and Device Supports:

1. Equipment and device supports shall be similar to that detailed on the Contract E- series Drawing “Typical Electrical Details.”’

2. In wet and/or corrosive environments, all metal brackets and fasteners shall be 316 stainless steel.

Page 31 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Supporting Devices
City of Stockton 26 05 01 - 3

PART 3 EXECUTION

3.01 WORKMANSHIP
A. All work in this Section shall conform to the codes and standards specified in Section 26 05 00 - Electrical.

B. The Supplier shall employ personnel that are skilled and experienced in the installation of support devices and assemblies. All installation labor shall be performed by qualified personnel who have had experience on similar projects. Provide first class workmanship for all installations.

C. Ensure that all equipment and materials fit properly in their installations.

D. Perform any required work to correct improper installations at no additional expense to the Owner.

3.02 INSTALLATION
A. System:

1. Install all products per Electrical Section 26 05 00- Installation, General.

2. Restore to original condition apparatus or equipment damaged prior to final acceptance. Protect bright finished surfaces and similar items until in service. No rust or damage will be permitted.

B. Conduit Supports Installation - Conduits shall be secured using approved manufactured supports, connectors, and securing devices. Conduits shall be supported independently of one another.

1. Single Runs: Conduit straps with backplates or ring bolt type hangers with specialty spring clips. Do not use plumbers perforated straps.

2. Multiple Runs: Unistrut conduit rack with 25 percent spare capacity.

3. Provide additional supports where obviously required or as directed by Engineer.

C. Equipment and Device Supports: Install plumb and level. Install anchors as listed in the approved seismic calculation submittals. Provide grout bases around all floor supports.

3.03 WARRANTY
A. Provide warranty as specified in Electrical Section 26 05 00- Warranty.

END OF SECTION

Page 32 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Nameplates
City of Stockton 26 05 02 - 1
SECTION 26 05 02

NAMEPLATES

1PART 1 GENERAL

1.01 SCOPE OF WORK

A. Contractor shall provide nameplates for all instruments, panels, enclosures, devices and equipment.

B. All nameplates shall be of the identical style, color, and material throughout the system.

C. Work includes that specified in Division 26 05 00.

D. Provide and install nameplates as specified herein.

1.02 SUBMITTALS AND DRAWINGS
A. Provide submittals and Drawings as specified in Electrical Section 26 05 03.

B. Submit schedule of all nameplates to be used on project. Submittal to include the following drawn with AutoCAD or equivalent printout:

1. Dimension of nameplate.

2. Exact lettering and font for each nameplate.

3. Color of nameplate.

4. Color of lettering.

5. Materials of construction.

6. Method and materials for attachment.

7. Drawing showing location of nameplate on each panel and enclosure.

2PART 2 MATERIALS

2.01 NAMEPLATES AND TAGS
A. Equipment Exterior Nameplates: Nameplate material shall be rigid laminated black phenolic with beveled edges and white lettering, except for caution, warning, and danger nameplates the color shall be red with white lettering. The size of the nameplate shall be as shown on the Drawings. No letters are allowed smaller than 3/16".

All phenolic nameplates located outdoors shall be UV resistant. Securely fasten nameplates in place using two stainless steel screws if the nameplate is not an integral part of the device.

Epoxy cement or glued on nameplates will not be acceptable.

1. Each major piece of electrical equipment shall have a manufacturer's nameplate showing the Contract specified name and number designation, the manufacturer's name, model designation, part number, serial number, and pertinent ratings such as voltage, amperage, # of phases, range, calibration, etc.

2. For each device with a specific identity (pushbutton, indicator, field control station,

Page 33 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Nameplates
City of Stockton 26 05 02 - 2
disconnect switches, etc.) mounted on the exterior or deadfront of a piece of equipment, provide a nameplate with the “Equipment Name and Equipment Number” inscription as shown in the Contract Documents. Where no inscription is indicated in the Contract Documents, furnish nameplates with an appropriate inscription providing the name and number of device.

3. For all receptacles and switches, provide a faceplate engraved or stamped with the panelboard and circuit number it is fed from. Also, include on faceplate or on a separate nameplate for each light switch identification use such as “OUTSIDE BUILDING LIGHTS”, “PERIMETER LIGHTS”, “MCC ROOM”, etc.

4. All field instruments and devices shall be labeled with designation shown on P&ID diagrams.

5. All transformers and panelboards shall have nameplates with ½" high letters and be engraved with designations as shown on one-line Drawings.

6. All disconnect switches shall have nameplates with ½” high letters and be engraved with designations as shown on one -line drawings or as directed by Owner.

B. Equipment Interior Nameplates: Nameplate material shall be clear plastic with black machine printed lettering machine; except caution, warning, and danger nameplates shall have red lettering. The size of the nameplate tape shall be no smaller than ½" in height with 3/8" lettering unless otherwise approved by the Engineer. Securely fasten nameplates in place on a clean surface using the adhesion of the tape. Add additional clear adhesive to hold the nameplate securely in place when necessary. For each device with a specific identity (relay, module, power supply, fuse, terminal block, etc.) mounted in the interior of a piece of equipment provide a nameplate located above the device with the inscription as shown in the Contract Documents. Where no inscription is indicated in the Contract documents, furnish nameplates with an appropriate inscription providing the name and number of device used on the Submittal Drawings. Stamp the nameplates with the inscriptions as approved by the Engineer in the submittal. Nameplates shall not be attached to wire way covers or to removable devices.

C. Equipment Tags: The Contractor shall attach a tag to the equipment ( including instruments) when there is not adequate room to place a nameplate. The tag shall be made from stainless steel material and the size of the nameplate shall be no smaller than 3/8"h x 2"w with 3/16" machine printed or engraved lettering unless otherwise approved by the Engineer. The tag shall be attached to the equipment with stainless steel wire of the type normally used for this purpose. SST wire must be crimp connected. Twisting ends together is not acceptable.

D. Engrave or machine print the nameplates and tags with inscriptions as approved by the Engineer in the nameplate submittal.

E. Provide temporary labels for all instruments and devices immediately when installed.

Temporary labels shall be provided with 1/2" letters minimum and labeled with P&ID tag number.

PART 3 EXECUTION

3.01 WORKMANSHIP

Page 34 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Nameplates
City of Stockton 26 05 02 - 3
A. All work in this Section shall conform to the codes and standards specified in Section 26 05 00 - Electrical.

B. All installation labor shall be performed by qualified personnel who have had experience on similar projects. Provide first class workmanship for all installations.

C. Perform any required work to correct improper installations or nameplates at no additional expense to the Owner.

D. Nameplates shall be readily visible and not painted over.

E. Damaged or pained over nameplates shall be immediately replaced.

F. Phenolic nameplates that are glued on shall be replaced with screw attached nameplates.

3.02 INSTALLATION
A. Install all products per Electrical Section 26 05 00- Installation, General.

B. Securely fasten nameplates in place using two stainless steel screws if the nameplate is not an integral part of the device. Epoxy cement or glued on nameplates will not be acceptable.

C. All nameplates shall be in place prior to the start of any field test.

END OF SECTION

Page 35 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Grounding
City of Stockton 26 05 26 - 1

SECTION 26 05 26

GROUNDING

1PART 1 GENERAL

1.01 SCOPE OF WORK
A. The Contractor shall install, ready for use, the grounding system as specified herein. This document describes the function of the grounding system and particular components, but does not necessarily describe all necessary devices. All components and devices shall be furnished and installed as required to provide a complete grounding system for accomplishing the functions and meeting the performance set forth hereinafter at no additional cost to the Owner.

B. Furnish all required labor, materials, project equipment, tools, construction equipment, safety equipment, transportation, test equipment, incidentals, and services to provide a complete grounding system as shown on the Drawings or included in these Specifications.

C. Work includes that the grounding system scope of work includes:

1. Provide and install miscellaneous trenching, grounding system wiring, and associated hardware.

2. Related work specified in Division 26 05 00.

1.02 SUBMITTALS AND DRAWINGS

A. Provide Submittals and Dr awings as specified in Section 26 05 03 for all grounding system components.

PART 2 MATERIALS

2.01 SERVICE GROUNDING
A. The main ground bonding wire from the ground shall extend up into the utility service entrance main switchboard for the visible connection with a UL approved "ground clamp" attached to the ground bus.

B. Network ground bond wires shall be connected between locations shown on Contract Drawings.

C. The system neutral shall be connected to the system's grounding conductor at only a single point in the system. This connection shall be made by a removable bonding jumper sized in accordance with the applicable provisions of the National Electrical Code. The grounding of the system neutral shall be in the enclosure that houses the service entrance main breaker.

D. Ground grid and bond wires shall be AWG bare copper as manufactured by Southwire, Houston Wire or approve equal. Ground grid and bond wires shall be sized as shown on the Plans or in accordance with NEC Table 250-66, whichever is greater.

E. The ground rods shall consist of not less that 10 continuous feet of ¾ -inch copper coated electroplated high grade carbon steel. The ground rods shall be pointed type, UL listed, manufactured of 1035 cold drawn steel. The ground rods shall extend up for visible connection of a

Page 36 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Grounding
City of Stockton 26 05 26 - 2

UL approved “ground clamp”.

F. Provide 14 inch diameter, 9-inch nominal throat, 12 inches depth minimum, concrete ground rod boxes where shown on plans. Boxes to have cast iron traffic cover embossed or engraved “GROUND.” Ground rod boxes to be as manufactured by BES Concrete Products, Christy Concrete Products, or approved equal.

G. All grid and bond wire connections shall be made with U.L. approved material and methods.

Ground clamps & connectors shall be made of cast bronze.

2.02 RACEWAY, EQUIPMENT AND ENCLOSURE GROUNDING

A. All raceway systems, supports, enclosures, panels, motor frames, and equipment housings shall be permanently and effectively grounded.

B. Ground clamps shall be bolt-on cast bronze type UL listed for grounding.

C. Grounding conductors shall be sized as shown on the Plans or in accordance with NEC Table 250- 122, whichever is greater.

D. Bonding wires shall be installed on ends of all metallic conduits with grounding bushings, expansion joints, and for continuity of raceways transitions. Bonding wires shall be solid bare copper sized and installed per NEC 250 -102. Bonding wires at endpoints shall be connected to enclosure ground bus or equipment grounding lug.

E. All equipment and devices shall be grounded in a manner that satisfies the requirements of the National Electrical Code.

F. One side or neutral of the secondary on all transformers shall be grounded to the ground bus or ground bond wire.

G. All receptacles shall have their grounding contact connected to a grounding conductor.

H. Branch circuit grounding conductors for receptacles, or other electrical loads shall be arranged such that the removal of a lighting fixture, receptacle, or other load does not interrupt the ground continuity to any other part of the circuit.

I. All metallic light fixture enclosures and ballasts shall be grounded.

J. Attachment of the grounding conductor to equipment or enclosures shall be by connectors specifically provided for grounding. Mounting, support, or bracing bolts shall not be used as an attachment point for ground conductors.

K. The negative side of all DC power supplies shall be grounded.

2.03 ENCLOSURE GROUND BUS
A. Each electrical, control and instrumentation enclosure shall be provided with a copper grounding bus bar, mounted on the inside of the enclosure. The grounding bar shall be mounted on non - insulated standoffs so that a good electrical connection is made between the ground bar and the cabinet through the mounting.

Page 37 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Grounding
City of Stockton 26 05 26 - 3

B. The bus bar shall be sized to meet the panel grounding requirements of NEC.

C. Each ground bus shall be copper and UL recognized. Screw type fasteners shall be provided on all ground buses for connection of grounding conductors. Ground bus shall have a minimum of 10 taps, and be rated for copper conductors. Ground bus shall be an ILSCO CAN Series, or approved equal.

3PART 3 EXECUTION

3.01 WORKMANSHIP
A. All work in this Section shall conform to the codes and standards specified in Section 26 05 00 - Electrical.

B. The Supplier shall employ personnel that are skilled and experienced in the installation grounding system, accessories, and assemblies. All installation labor shall be performed by qualified personnel who have had experience on similar projects. Provide first class workmanship for all installations.

C. Ensure that all equipment and materials fit properly in their installations.

D. Perform any required work to correct improper installations at no additional expense to the Owner.

E. All grounding system components installed by the Contractor shall be in accordance with the Drawings, NEC, and the manufacturer's recommendations and instructions.

3.02 INSTALLATION
A. System:

1. Install all products per Electrical 26 05 00 - Installation.

2. Provide a separate grounding conductor in each raceway, securely grounded to equipment at each end of raceway.

3. Bond metal piping and building structure metal frames to grounding electrode per NEC.

4. Contractor shall not conceal or cover any ground connections until the Engineer or Owner has established that every grounding connection conforms to the Contract Drawings and Specifications and has given the Contractor written confirmation.

5. Grounding details shown on plans are minimum. If additional equipment, such asground rods, clamps, conductors, etc., is required per NEC, and Title 24 CAC, furnish and install same without additional cost to Owner.

B. Connections:

1. Use U.L. approved cast bronze ground clamps specifically designed for grounding purposes. Strap metal is not acceptable for grounding or bonding.

2. Exposed connections to ground buses, raceways, and small pipes shall be made by means of

Page 38 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Grounding
City of Stockton 26 05 26 - 4

U.L. approved grounding clamps. Exposed connections between different metals shall be sealed with No-Oxide Paint Grade A, or approved equal.

3. All buried, ground rod, large pipe, and steel plate or frame ground bond connections shall be made by welding process equal to CADWELD.

C. Electrical Equipment Grounding:

1. Metal conduits shall be bonded together to the enclosure ground bus.

2. Lightning arresters or suppressors, shall be directly connected to the ground system using copper conductors sized per manufacturer’s literature.

3. Transformer secondary neutrals shall be directly connected to the ground system using copper conductors sized as per NEC.

4. All motors shall be grounded by bonding the grounding conductor within the raceway to the motor frame. Motors as shown on Electrical Plans shall also have a supplemental grounding conductor bonded to the ground grid in the immediate area of the motor.

5. Each panelboard shall be equipped with a ground bus secured to the interior of the enclosure. The bus shall be equal to panelboard neutral bus amp rating and shall have adequate quantity of lugs. No more than two grounding conductors shall be installed per lug.

D. Excavation and Back Filling:

1. Trenches for all bare copper ground bond wires shall be excavated to a minimum depth of 30”.

2. Back filling shall be done only after grounding system has been inspected. Excavation and back fill of grounding system shall conform to the requirements of Division 2 of these Specifications.

3. At all times during the installation of the grounding system, the Contractor shall provide barricades, fences, guard rails, etc., to safeguard all personnel, including small children, from excavated trenches.

E. Cutting and Patching:

1. The Contractor shall do all cutting and patching required to install his work. Any cutting which may impair the structure shall require prior approval by the Engineer. Cutting and patching shall be done only by skilled labor of the respective trades. All surfaces shall be restored and painted to their original condition after cutting and patching.

3.03 WARRANTY
A. Provide warranty as specified in Electrical Section 26 05 00 - Warranty.

END OF SECTION

Page 39 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Motor Starters
City of Stockton

26 22 26- 1
SECTION 26 22 26

MOTOR STARTERS
PART 1 GENERAL

1.01 SUMMARY
A. Section Includes: Full voltage across the line starters, magnetic contactors, overload relays, combination starters and related motor controllers.

1.02 REFERENCES
A. National Electrical Code (NEC):

1. Article 430 - Motors, Motor Circuits and Controllers.

B. National Electrical Manufacturers Association (NEMA).

1.03 SUBMITTALS
A. Shop Drawings: Submit all Product DATA.

B. Manufacturer's installation instructions.

1.04 WARRANTY
A. Submit manufacturer's standard warranty.

PART 2 PRODUCTS

2.01 MANUFACTURERS
A. Variable Frequency Drives for pump operation:

1. Allen-Bradley. Power Flex 700 series or approval equal.

2.02 STARTERS
A. Suitable for the horsepower ratings specified, and in accordance with NEC Article 430.

B. Verify motor ratings and coordinate starter and overload trip ratings with actual horsepower and nameplate current ratings of motors installed.

C. Magnetic Contactors: Factory adjusted and chatter free.

D. Overload Relays: Install bimetallic type overload relays in each line conductor as indicated on the Drawings. Provide contacts for remote monitoring of overload status as indicated on the Drawings.

Page 40 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Motor Starters
City of Stockton

26 22 26- 2
E. Mount extended overload reset buttons to be accessible for operation without opening door of enclosure. Plastic overload relay reset buttons with plastic operator shafts are unacceptable.

F. Provide starters of sufficient size to accommodate motors furnished, including larger starters required for larger motors supplied by CONTRACTOR.

G. Combination Starters: Furnish complete with a 120 volt control transformer unless otherwise noted.

H. Control Fuses: Size and furnish as required and where indicated in the schematics.

I. VFD shall be specific to Pump Operation and be able to program start Pressure, Target Pressure, Ramp times, Drives shut off time and Have a Full Speed by pass contact.

I.1 Protection
A. Heat Sink Thermistor. Monitored by microprocessor overtemp trip.

B. Drive Overcurrent Trip.

1. Soft Current Limit: 20-160% of rated current.

2. Hardware Current limit: 200% of rated current (typical).

3. Instantaneous Current limit: 220-300% of rated current (dependent on drive rating).

C. Line transients, up to 6000 volts peak per IEEEC62.41-1991.

D. Control logic Noise Immunity, Showering arc transients up to 1500V peak.

E. Power Ride-Thru, 15 millisecond sat full load.

F. Logic Control Ride-Thru, 0.5 seconds minimum, 2 seconds typical.

I.2 Agency Certification
A. The drive is designed to meet the following specifications: NFPA 70- US National Electrical Code NEMA ICS 3.1 – Safety standards for Constructions and Guide for Selection, Installation and Operation of Adjustable Speed Drive Systems. NEMA 250 Enclosures of Electrical Equipment IEC 146 – International Electrical Code.

B. UL and cUL Listed to UL508C and CAN/CSA-C2.2 No. 14-M91.

I.3 Environment
A. Altitude: 1000 m (3300 ft) max. without derating.

B. Ambient Operating Temperature without derating, NEMA Type 1: 0 degrees © to 40 degrees © (32 degrees (f) to 104 degrees (f).

Page 41 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Motor Starters
City of Stockton

26 22 26- 3
I.4 Electrical
A. Voltage Tolerance, -10% of minimum, + 10% of maximum.

B. Frequency Tolerance, 47-63 Hz.

C. Input Phase, Three-phase input provides full rating for all drives. Single-Phase operation provides 50% or rated current.

D. Efficiency, 97.5% at rated amps, nomical line volts.

I.5 Control
A. Method: Since coded PWM with programmable carrier frequency. Rating apply to all drives (refer to the Derating Guidelines on page 1-3 or reference manual). The drive can be supplied as 6 pulse or 12 pulse in a configured package.

B. Carrier Frequency: PF700 – 0-3 Frames: 2-10 kHz. Drive rating based on 4 kHz.

C. Output Voltage Rang: 0 to rated motor voltage.

D. Output Frequency Range: 0 to 400 Hz.

E. Electrical Motor Overload Protection: Class 10 protection with speed sensitive response.

Investigated by U.L. to comply with N.E.C. Article 430. U.L. File E59272, volume 12.

PART 3 EXECUTION

3.01 INSTALLATION

3.02 APPLICATION
A. Supply circuit breaker trip elements and starter overload trip elements to meet above normal ambient temperatures where such conditions are anticipated (subject to ENGINEER's acceptance).

3.03 DEMONSTRATION
A. Demonstrate operation of equipment.

3.04 PROTECTION
A. Protect products until acceptance by OWNER.

END OF SECTION

Page 42 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Panelboard and Panelboard Transformer City of Stockton 26 24 16 - 1

SECTION 26 24 16

PANELBOARD

1PART 1 GENERAL

1.01 SCOPE OF WORK
A. The Contractor shall supply the panelboards and panelboard transformers shown on the Contract Drawings and as specified herein.

B. Furnish all required labor, materials, safety equipment, transportation, test equipment, incidentals and services to provide complete and operational panelboards as described in these Specifications and required for fully operational facility.

C. Work includes that specified in Section 26 05 00 - Electrical.

D. The panelboard:

1. Providing panelboard.

2. Installation of panelboards at locations shown on Drawings.

3. The quantity of breakers with size and number of poles as shown on panelboard schedules.

4. Submittal data and Drawings.

5. Startup assistance.

6. Testing.

7. Operation and maintenance manuals.

8. Warranty of all components of the panelboards.

1.02 SUBMITTALS AND DRAWINGS
A. Provide data and drawings for all materials furnished under this Section with the content and format as specified Section 26 05 03.

B. Provide ratings and characteristics including voltage ratings, busing arrangements, continuous current ratings, fault current withstand ratings, neutral bus rating, ground bar, ratings, and arrangement of overcurrent protective devices.

C. Provide catalog cuts for panelboards, circuit breakers and transformers.

D. Submit panelboard schedules for approval.

E. Existing panelboard schedules were developed based on best available information.

Contractor shall verify that circuits to be used for this project are available.

Page 43 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Panelboard and Panelboard Transformer City of Stockton 26 24 16 - 2

1.03 OPERATIONS AND MAINTENANCE MANUALS
A. Provide data and Drawings for all materials furnished under this Section with the content and format as specified Section 26 01 26.

2PART 2 MATERIALS

2.01 PANELBOARDS
A. General:

1. The Contractor shall furnish panelboards of a type indicated on the Contract panelboard schedules and specified herein.

2. Panelboards shall comply with the applicable Sections of UL, NEC, and NEMA and be manufactured by the same manufacturer for all panelboards.

3. A removable machine- typed circuit directory with clear plastic cover shall be shipped with each panelboards and mounted on the inside of door in a frame. Circuit directory shall be as approved in the Submittal. Circuit directory shall be updated or replaced to show asbuilt breaker identification.

4. The directory cards shall be placed in panelboards when the panelboards are mounted in field and prior to termination of wires to breakers.

B. Interior:

1. Factory assembled with bolt-on devices.

2. Full size insulated neutral bus shall be included. Neutral busing shall have a suitable lug for each outgoing feeder requiring a neutral connection.

3. Bus bar shall be copper sized in accordance with UL standards to limit temperature rise on any current carrying part to a maximum of 50° C above an ambient 40° C maximum.

4. A copper ground and neutral bus bar shall be included in panelboards with terminal screws.

C. Trim:

1. Provide hinged door over all circuit breaker handles. Door of panelboard trim shall not uncover any live parts. Door shall have a catch, lock, and trim.

2. Surface of the trim assembly shall be properly cleaned, primed, and a finish coat of gray paint to match MCC color when installed in MCC, otherwise painted to match room décor.

3. Provide engraved nameplates on panelboards as specified in Section 26 05 02 - Nameplates.

Page 44 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Panelboard and Panelboard Transformer City of Stockton 26 24 16 - 3

D. Panelboard Ratings:

1. Panelboards shall be rated as shown on the Contract Drawings.

2. Breakers shall be a minimum of 100 ampere frames. Breakers 15 through 100 amperes trip size shall take up the same pole spacing. All panelboard breakers shall be provided with individual padlock hasps (lockable in off position). Provide molded-case breakers with quick-make and quick-break toggle mechanism, inverse- time trip characteristics, and trip-free operation on overload or short circuit.

Automatic tripping shall be indicated by handle position between the manual OFF and ON position. Provide high intensity discharge (HID) rated circuit breakers for HID lighting circuits. Provide HACR rated breakers for all HVAC loads. Provide trip ratings as indicated in panelboard schedule. Series breakers devices are not allowed to meet interrupt ratings listed.

3. Panelboards shall be labeled with a UL short circuit rating.

E. Space Only:

1. Where "space" is noted on the drawings, provide connectors, mounting brackets, blank covers, etc., for the future insertion of an overcurrent device.

PART 2 EXECUTION

2.01 GENERAL
A. Set taps under load conditions for correct voltage.

B. Install transformers located outside MCC on Korfund double -deflection mounts selected for the weight of the transformer, to produce the maximum isolation.

Secure with four one -half inch (minimum) diameter stainless steel anchors, minimum 2-1/2" embedment.

C. For floor and wall mounted transformer install with a 6" minimum clearance (or distance required by transformer manufacturer) between transformer and walls.

2.02 WORKMANSHIP
A. All work in this Section shall conform to the codes and standards specified in Section 26 05 00 -Electrical.

B. Ensure that all equipment and materials fit properly in their installations.

C. Perform any required work to correct improper installations at no additional expense to the Owner.

2.03 WARRANTY
A. Provide warranty as specified in Electrical Section 26 25 00- Warranty.

END OF SECTION

Page 45 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Motor Control Center
City of Stockton 26 24 19 - 1

SECTION 26 24 19

MOTOR CONTROL CENTER

1PART 1 GENERAL

1.01 SCOPE OF WORK
A. The System Supplier shall customize and supply the motor control centers (MCC) as specified herein. Standard MCCs supplied direct from MCC manufacturer’s factory will not be accepted. This document describes the function and operation of the system and particular components, but does not necessarily describe all necessary devices. All components and devices shall be furnished and installed as required to provide a complete operable and reliable system for accomplishing the functions and meeting the performance set forth hereinafter.

B. Furnish all required labor, materials, safety equipment, transportation, test equipment, incidentals and services to provide a complete and operational MCCs as described in these Specifications, or required for fully operating facility.

C. Work includes that specified in Division 16.

D. The MCC scope of work includes:

1. Providing MCCs.

2. Installation of the MCCs.

3. Submittal data and Drawings.

4. Startup assistance.

5. Testing.

6. Operation and maintenance manuals.

7. Warranty of all MCC components.

E. All wiring and terminal blocks within each MCC shall be labeled. All neutral wires shall have white insulation.

F. All MCCs shall be wired at System Supplier’s facilities.

G. Foot prints of MCCs shown on Contract Drawings were developed based on best available information. It is the Contractor’s responsibility to obtain site plans of the location for each MCC, control panel, etc to ensure the supplied equipment is appropriate for the location. Contractor is responsible for any additional conduits, wires, construction costs, engineering design requirements, etc to accommodate MCC, control panel, etc that are larger than that shown on Contract Documents.

Page 46 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Motor Control Center
City of Stockton 26 24 19 - 2

1.02 SUBMITTALS
A. Provide Data and Drawings as specified in general conditions specification.

B. All submittal drawings shall be prepared by System Supplier. Factory supplied MCC drawings are not acceptable.

1.03 OPERATION AND MAINTENANCE MANUALS
A. Provide operation and maintenance manuals as specified in general conditions specifications.

B. In addition, include the following records in the O&M manuals for the MCC:

1. Each motor starter including manufacturer, full part number, size, etc.

2. Each overload heater element size and setting including manufacturer, full part number, size, etc.

3. Each breaker part number and as-finalized breaker setting.

1.04 SUPPLIERS SERVICES
A. Prices for the items specified shall include the following services of MCC supplier technical representatives at the job site. The number of hours and scope of services indicated are minimum requirements not including travel time. Time for travel and all associated expenses shall also be included in bid price for the work.

1. 8 Labor hours per MCC - Installation assistance, field inspection and functional testing.

2PART 2 MATERIALS

2.01 MOTOR CONTROL CENTERS
A. General:

1. Each motor control centers (MCC) shall be built and tested in accordance with:
a. NEMA Standards.
b. ANSI.
c. Underwriter’s Laboratories, Inc.

2. Each MCC shall comply with all provisions of UL 845, and bear a separate UL label on each individual MCC Section. In addition, all wiring, devices, and components contained therein, shall be UL labeled for the application. UL approval and labels shall be provided for the individual MCC Sections prior to delivery from the factory. Field UL labeling will not be allowed.

3. MCCs shall be 600 volt class rated to operate from an incoming power as shown on Contract one-line diagrams.

Page 47 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Motor Control Center
City of Stockton 26 24 19 - 3

4. MCC construction shall consist of NEMA rated as shown on Contract Drawings deadfront enclosure. MCCs shown as NEMA 12 shall be NEMA 1 type with gasketed doors to reduce dust entry. The height of the MCC shall be 90 inches.

5. MCC fabrication shall be NEMA Class II with NEMA Type B wiring.

6. Each MCC shall be provided with the type, capacity, and ratings of components shown on the Drawings or otherwise specified. The breakers shall be rated to withstand an available fault current shown on contract Drawings.

7. MCP breakers shall be selected to have trip and breaker size based on the motor full load amps to meet NEC. When the MCP breaker size changes due to a different motor size and full load amps than that shown on the Contract Drawings, the Contractor shall provide the properly sized MCP breaker at no additional cost to Owner.

8. MCC components such as relays, starters, breaker, lights, switches, etc. shall meet the requirements of Section 26 05 00.

B. Qualifications:

1. MCC structures shall provide for all equipment detailed on the single line Drawings including all spares and spaces. Where possible, the MCC shall be built in strict accordance with overall sizing and component layouts as detailed on the Drawings and no deviations will be allowed without prior approval of the Owner.

2. When physical size requirements for individual components are different than those detailed on the MCC elevation Drawings, the single line Drawing shall supersede the elevation Drawing, and the Contractor shall furnish additional vertical Sections based on the Owner's approval as required to provide for all equipment including spares and spaces at no additional cost to Owner. The concrete houskeeping pad shall be expanded by Contractor at no additional cost to Owner when larger MCCs are supplied.

3. MCCs shall have major components and subsystems therein (i.e., breakers, contactors) that are standard for the MCC manufacturer.

4. All devices and components located in different MCC cubicles (i.e., VFDs, contactors, control relays, timers, etc.), shall be the product of same manufacturer throughout for each device or component type.

5. All starters and contactors shall be rated and designated in accordance with NEMA standards. Starters and contactors rated in amperes without manufactures published data indicating the corresponding NEMA sizes will not be acceptable. Submittals shall provide cross reference data which includes details of the manufacturer compliance with NEMA standards and tests.

6. MCCs shall be Cutler-Hammer 2100 Series customized to match existing.

C. Construction:

Page 48 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Motor Control Center
City of Stockton 26 24 19 - 4

1. Each MCC shall consist of standard metal -enclosed, freestanding, dead-front and dead-back vertical Sections, not more than 90 inches in height and not less than 20 inches deep. The framework shall be made of 12 -gauge steel channels. The composite MCC shall consist of vertical sections that are of equal height.

2. Working height excluding the upper and lower wireways of MCC shall be 72 inches (min). Minimum compartment height shall be twelve inches.

3. Each Section shall be provided with a horizontal top and bottom wireways.

Wireways shall be readily accessible and isolated from all busing by grounded steel barriers. The bottom wireways shall have adequate conduit entrance area and shall not be obstructed by transformers, capacitors, or other devices. The wireways in each Section shall line up with wireways in the adjacent Sections, with openings between, so that wires may be pulled the entire MCC length.

4. Where shown on the Drawings, isolated vertical wireways shall be provided, each with a separate full height door. Vertical wireways shall intersect the top and bottom horizontal wireways for easy cable routing. Vertical wireways shall have wire hangers for wire tie -down spaced throughout the complete vertical trough.

Vertical wireway doors shall be latched by quarter turn indicating type fasteners.

5. Each MCC shall be designed for front access maintenance. All wiring, bus joints, and other mechanical parts requiring tightening or other maintenance shall be accessible from the front. Rear or side access shall not be necessary for inspection or maintenance.

6. All steel work shall be immersion cleaned and phosphated to inhibit rust prior to painting. Paint finish shall be electrostatically applied dry powder, baked to thermoset. MCC compartment interior color shall be white. All other interior and exterior MCC structure surfaces shall be finished in an ANSI 61 or ANSI 49 gray color. No field painting will be allowed except for "touching up" of damaged areas.

7. A manufacturer's nameplate shall be attached to each MCC giving the model number, serial number, bus amps, voltage, and other manufacturer's information pertaining to the MCC construction.

8. MCCs shall be furnished completely factory assembled and shipped to the jobsite in shipping sections. Assembly of components into MCC at the jobsite is not allowed (except for connection of shipping section). Removable lifting angles or eyes shall be provided on the top of each MCC shipping section.

D. Bus System:

1. All bus material shall be copper. Aluminum buswork is not allowed. All buses, except ground buses, shall be completely isolated by steel plates or insulating material.

2. A continuous horizontal bus shall be furnished and rated as shown on the Contract One-Line Drawings.

Page 49 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Motor Control Center
City of Stockton 26 24 19 - 5

3. A full length vertical bus shall be furnished in each Section and rated as shown on the Contract Elevation Drawings. Current rating shall apply to the full length of the vertical bus, tapered bus shall not be allowed. Vertical buses shall be insulated and isolated with glass polyester or equivalent continuous barriers. Cutouts shall be provided in the barriers for plug -in stab connections. Unused stab openings shall be plugged. Lower ends of vertical buses shall be insulated.

4. Buses shall be sized and braced to withstand a fault of symmetrical amperes listed on Contract one -line drawings. MCC protective breaker(s) shall have an interrupting capacity to isolate a fault current of this magnitude.

5. A copper ground bus shall be provided in the bottom horizontal wireway of each Section. The ground bus shall be rated 300A minimum. It shall be electrically continuous the entire width of each MCC. Provide cable lugs on ground bus for incoming power grounding conductors.

E. Compartments:

1. Compartments shall be isolated from each other by separate horizontal steel plates without openings that are a part of the unit itself. Draw-out units shall totally isolate enclosed equipment. All unused openings to the adjacent vertical wiring space shall be plugged. All openings used for wiring shall have insulating grommets.

2. Doors for each compartment shall be fabricated from formed sheet steel of not less than 14 gauge thickness. The door opening shall be of sufficient size to permit ready removal of any of the devices in the compartment. Doors shall be mounted on adjustable and removable pin type concealed hinges so arranged that compartment doors may be removed without disturbing compartment doors above or below. Door latches shall be quarter turn indicating type fasteners.

Overload
relays shall be reset from outside the enclosure by means of an insulated button mounted on the door.

3. An operator mechanism mounted on the draw-out unit shall provide the means for operating the compartment breaker or disconnect switch. The operator shall extend through an opening in the compartment door and shall clearly indicate whether the disconnect is "on", "off", or "tripped". This indication shall function whether the door is open or closed. The operating mechanism shall not be attached to the compartment door.

4. Each compartment for combination starters, breakers, and disconnect switches shall be draw -out construction, containing individual units. Draw -out provisions shall include a positive guide rail system and stab shrouds to absolutely ensure alignment of stabs with the vertical bus. The stabs shall be tin plated copper alloy and shall provide a self aligning pressure connection. The stab design shall ensure a consistent low -resistance contact with the vertical bus even after repeated insertions and removals. Power wiring to stabs shall be contained within the draw-out unit. No wire shall extend behind the unit.

5. All similar compartments shall have the same structural features and the units shall be interchangeable.

Page 50 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Motor Control Center
City of Stockton 26 24 19 - 6

6. With the disconnect in the "on" position, a mechanical interlock shall prevent opening of the door. This interlock shall be provided with a defeater so that authorized personnel may gain access to the compartment without interrupting service. This interlock shall also prevent unintentional closing of the disconnect when the compartment door is open. A second mechanical interlock shall prevent any possibility of removing or reinserting the draw -out unit while the disconnect is in the "on" position.

7. The operator mechanism shall allow padlocking of the disconnect in the "off" position with up to three padlocks.

8. Compartment interconnect wiring shall be to connected to pull apart terminal blocks.

9. Pushbuttons, selector switches, and indicating lights shall mount where shown on the Drawings on a removable device panel which is part of the draw-out unit. The device panel shall not be part of the door.

10. Compartments containing panelboards shall have panelboards installed per Section 26 24 16.

11. Compartments containing motor starters shall each have an overload selection table posted inside the door.

12. MCC compartments labeled as space shall have a blank hinged door and drawout relay panel installed, occupying the full space area.

3PART 3 EXECUTION

3.01 WORKMANSHIP
A. All work in this Section shall conform to the safety lockouts, codes and standards specified in Section 26 05 00 - Electrical.

B. The Supplier shall employ personnel that are skilled and experienced in the startup and testing of all elements, equipment, devices, instruments, accessories, and assemblies. All installation labor shall be performed by qualified personnel who have had experience on similar projects. Provide first class workmanship for all installations.

C. Ensure that all equipment and materials fit properly in their installations and all doors open a minimum of 90°.

D. Electrical Section 26 05 00 - General Construction Methods and General Equipment Fabrication apply to the construction and assembly of MCCs.

E Perform any required work to correct improper installations at no additional expense to the Owner.

3.02 INSTALLATION
A. MCCs shall be factory inspected and witness tested by the Owner prior to it being

Page 51 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Motor Control Center
City of Stockton 26 24 19 - 7

shipped to the jobsite. If a MCC shows up at the jobsite and has not been previously inspected and tested by the Owner, then the Contractor shall remove the MCC from the jobsite and return it to the factory for factory inspection and witness testing, all at the expense of the Contractor.

B. Vertical Sections shall be mounted, leveled, and anchored to the concrete pad.

C. In general, all conduits entering or leaving a MCC shall be stubbed up into the bottom horizontal wireway directly below the vertical Section in which the conductors are to be terminated.

D. All motor starters that utilize changeable overload heater elements shall be furnished to the job site without the elements installed. After the mechanical equipment arrives, the Contractor shall check the nameplates for the full load amperage (FLA) rating and select the appropriate overload element to be installed. Electronic overloads shall be adjusted based on equipment nameplate FLA rating.

E. Field interconnect wiring to the MCCs shall be neatly grouped by compartment and bound by plastic ty-wraps. All wiring shall be supported so that circuit terminations are not stressed.

F. All lugs shall be copper sized for wires listed in the Conduit and Wire Routing Schedule.

G. Provide extension handles for breakers with center of the grip of the operating handle, when in its highest position, is above 78" from floor in order to conform with NEC Article 404-8.

H. The as -built electrical Drawings shall be placed in a water tight plastic wrap and shipped with the MCCs to the jobsite.

I. Construction of MCC Sections shall be modular to allow installation of MCCs in buildings through standard access doors.

J. Provide 1 cup of each color used for exterior paint finish of MCC to Owner for its use.

K. Clean and touch up paint the MCC exterior surfaces prior to final punch list.

L. Clean and vacuum the interior of MCC prior to applying power and at the end of project, prior to final acceptance.

3.03 FIELD TESTS
A. Provide field testing of.

3.04 WARRANTY
A. Provide warranty as specified in Electrical Section 26 05 00 - Warranty.

END OF SECTION

Page 52 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Conduits
City of Stockton 26 27 00 - 1

SECTION 26 27 00

CONDUITS

1PART 1 GENERAL

1.01 SCOPE OF WORK
A. This Specification Section covers the furnishing, installing and testing of all conduit, fittings, and supports as specified herein, as shown on the Drawings, and as required for a complete electrical installation.

B. The provisions of Section 26 05 00 of these Specifications shall apply, unless otherwise specified in this Section.

C. The conduit system shall consist of the types and sizes as required and shall include all rigid steel conduit, flexible conduit, non-metallic conduit, wireway, and accessories as required for the embedded and exposed raceway systems.

1.02 SUBMITTALS
A. Provide data and Drawings for all materials furnished under this Section with the content and format as specified in Section 26 05 03.

B. Submittals for the Conduit materials and equipment shall include, but shall not be limited to, the following:

1. Catalog cuts showing manufacturer, catalog numbers, dimensions, weights and material for all raceway and accessories.

2. Dimensioned "as-built" Drawings of Contract Electrical plans.

3. Marked up “as-built” Conduit & Wire Routing Schedule.

1.03 QUALITY ASSURANCE

A. Materials shall be of a manufacturer that has been fabricating and assembling specified raceway systems in his current facility for a minimum of two (2) years.

B. All materials selected for the manufacture of the hardware shall be the best available for the purpose for which they are used, considering strength, ductility, durability, and the best engineering practice.

C. All like parts shall be interchangeable.

PART 2 MATERIALS

2.01 REFERENCE STANDARDS
A. Conduits supplied under this Contract shall be designed, manufactured, and tested in accordance with the latest version of the following standards.

Page 53 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Conduits
City of Stockton 26 27 00 - 2

B. American National Standards Institute (ANSI) Publications:

C33.92 Flexible Liquidtight Metal Conduit
C80.1 Rigid Steel Conduit
C80.4 Rigid Steel Conduit Fittings
C. National Electrical Manufacturer’s Association (NEMA):

FB 1 Fittings and Supports for Conduit Cable Assemblies TC-2 and TC-3 Non-metallic Conduit and Fittings
RN 1 Rigid Steel Conduit PVC jacketed
D. Underwriter’s Laboratories, Inc.:

UL-514A Metallic Outlet Boxes, Electrical
UL-870 Wireways, Auxiliary Gutters and Associated Fittings UL-6 Rigid Metal Electrical Conduit
UL 651 Schedule 40 and 80 Rigid PVC Conduit

2.02 CONDUIT AND CONDUIT FITTINGS
A. General:

1. Conduit, fittings, and raceway materials shall be manufactured in accordance with UL and ANSI standards and be UL labeled for the application.

2. The Contractor shall use special conduit, raceways, wireways, construction methods, and materials as shown on the Contract Drawings and “Conduit and Wire Routing Schedule” which shall take precedence over any general methods and materials specified in this Section.

3. Continuation of conduit runs, not specifically called out in Conduit and Wire Routing Schedule, especially “flex” conduits, shall be provided with wires listed in Conduit and Wire Routing Schedule of previous runs.

B. Material for the conduit system shall conform to the following:

1. Galvanized Rigid Steel Conduit (GRS):

a. Rigid steel conduit, couplings, bends and nipples shall be in accordance with ANSI C80.1 and UL-6.

b. Hotdip galvanized inside and outside after fabrication and then coated with a zinc bichromate finish.
c. Galvanized rigid steel factory elbows for indoor NEMA 12 90 degree transitions. Outdoor or Non -NEMA 12 area transitions shall be GRS-PVC factory ells.
d. EMT or IMC is not considered an equivalent to GRS.
e. GRS conduit is allowed only when specifically called out in the “Conduit

Page 54 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Conduits
City of Stockton 26 27 00 - 3

and Wire Routing Schedule”.

2. Flexible Liquidtight Metal Conduit: (FLEX):

a. Flexible liquidtight metal conduit shall be in accordance with ANSI C33.92 and shall be galvanized steel core with a copper bonding conductor between the spiral segments and an extruded synthetic jacket overall to insure a liquid-tight conduit. Flexible metallic conduit shall be fabricated from galvanized interlocked steel strip. Liquid -tight flexible metallic conduit shall have an extruded polyvinylchloride covering of the flexible steel conduit. The conduit shall be Anamet Sealtite Flexible conduit, or equal.
b. FLEX conduits shall meet the minimum requirements of NEC Code Table C3 “Maximum Number of Conductors and Fixture Wires in Flexible Metallic Conduit” and Table C3A “Maximum Number of Compact Conductors in Flexible Metallic Conduit.”
c. Minimum trade size - one-half inch (½") unless otherwise shown on Contract Drawings.
d. Flexible conduit lengths shall not be greater than 36 inches for conduits 1½" or smaller (½" minimum) and 48 inches for conduits 2" or larger. e. Flexible metallic conduit shall not be considered as a ground conductor, install a separate wire for equipment bonding.
f. Non-metallic flexible conduit shall not be used.
g. Flexible conduit shall only be installed in exposed or accessible locations. h. Install flexible conduit in a manner that will minimize stress on connectors.

3. Rigid Galvanized Steel Conduit PVC Bonded (GRS-PVC): Conduit shall conform to the requirements of NEMA RN1, Type A40. GRS-PVC conduit shall be rigid galvanized steel conduit to which an epoxy acrylic primer and a 40 mil thick UV rated polyvinyl chloride coating has been bonded. The interior of all GRS -PVC conduits and fittings shall be coated with a two part chemically cured urethane coating at a 2 mil minimum thickness. Bond strength shall exceed the tensile strength of the plastic coat. Furnish Perma Cote Supreme, Robroy Industries, or approved equal.

a. Minimum trade size - three-quarters inch (¾") unless otherwise shown on Contract Drawings.
b. Provide PVC coated galvanized rigid steel factory elbows for 45 or 90 degree transitions.
c. All fittings used with plastic coated conduit shall be similarly coated with not less than 40 mils of polyvinyl chloride and shall be provided with Type #316 stainless steel hardware.
d. For factory coated conduit, use overlapping PVC sleeves. Sleeves shall extend beyond end of fitting minimum distance equal to nominal diameter of conduit, and shall fit tightly over conduit coating to form a watertight joint. Joints and fittings shall be made tight with strap wrenches. e. All damage to PVC jacket shall be repaired with four separate applications of PVC paint. Finished patch shall be 0.040 -inch minimum thickness.

PVC coating patching material shall be as provided by the Manufacturer.

Page 55 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Conduits
City of Stockton 26 27 00 - 4

f. Support channel and pipe straps shall be PVC coated. Exposed metal bolts/nuts, all-thread rod shall be 316 stainless steel. g. GRS-PVC conduits shall be used for all underground conduits except service entrance conduits.

4. Rigid Polyvinyl Chloride (PVC) Conduit: PVC conduit shall be manufactured in accordance with UL 651. PVC conduit shall be Schedule 40 or Schedule 80 high impact polyvinyl chloride, UL listed for direct burial and UV light resistant. a. Minimum trade size - one inch (1") unless otherwise shown on Contract Drawings.
b. PVC fittings shall have solvent-weld-type conduit connections. c. PVC conduit is not suitable for above grade installation except where specifically called out in Conduit and Wire Routing Schedule.

5. Electrical Metallic Tubing (EMT):

a. EMT shall be galvanized thin wall conduit conforming to UL 797. b. Minimum trade size - three-quarters inch (¾") unless otherwise shown on Contract Drawings.
c. Couplings and connectors for EMT shall be galvanized or cadmium plated and shall be of the compression type requiring the tightening of a nut on a gland ring.
d. Rolled steel, zinc coated outside with zinc-coating or other approved corrosion-resistant coating on the inside.
e. EMT conduits may be used as follows when listed on plans or in the Conduit and Wire Routing Schedule:

1) Conduit runs on walls and ceilings inside buildings more than 8 feet above the floor. EMT can be used below 8 feet, but not lower than 1 foot above the floor when EMT originates from above and conduit does not penetrate the floor. EMT Conduit may not be used in normal exposed locations lower than 8 feet above the floor when conduits penetrate the floor.
2) Concealed in drywall partitions.
f. EMT conduits shall not be used:

1) When other types of conduit material are specifically called out in the Conduit and Wire Routing Schedule.
2) Any location subject to physical damage.
3) Normal exposed locations lower than 8 feet above the floor when conduits penetrate the floor.
4) In boiler rooms.
5) Wetwell, outdoor or corrosive locations.

6. Fittings:

a. GRS Fittings:
1) Fittings for GRS conduits shall be threaded type.

Set-screw type and compression-type are not
acceptable. Fittings shall conform to the
requirements of ANSI C80.4.

Page 56 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Conduits
City of Stockton 26 27 00 - 5

b. Flex Fittings:
1) Non-NEMA 4X locations shall have cadmium -
plated malleable iron body and gland nut with
cast-in lug, brass grounding ferrule threaded to
engage conduit spiral and O -ring seals around
the conduit and box connection and insulated
throat. Fittings, for not -NEMA 4X locations
only, shall have insulted throats, liquidtight,
oil tight, suitable for outdoors and class I, Div 2
locations.
2) NEMA 4X rated areas shall have PVC
coated flex fittings and connectors.
c. GRS-PVC Fittings:
1) GRS-PVC fittings shall be hot dipped galvanized
steel or galvanized cast ferrous metal with a PVC
40 mils thick exterior coating.and 2 mil thick
interior coating. Provide threaded -type fittings,
couplings, and connectors; set-screw type and
compression-type are not acceptable. Electrical
continuity shall be maintained across
assembled joints. Fittings shall be Robroy
Perma-Cote, or approved equal coated fitting.
d. EMT Fittings:
1) Couplings shall be rain tight compression type
Appleton Series, Efcor 760 Series, or approved
equal.
2) Connectors shall be rain tight compression type
with insulated throat Appleton Series, Efcor 750B
Series, or approved equal.

C. Conduit Type by Installation: Provide conduits as listed in “Conduit & Wire Routing Schedule” or as shown on Contract Drawings. Conduits not covered by in “Conduit & Wire Routing Schedule” or Contract Drawings shall be GRS-PVC except where EMT is allowed.

2.03 WIREWAY
A. All Wireways shall have hinged access covers.

B. Wireways shall be constructed in accordance with Underwriter’s Laboratories Standards UL 870 for Wireways, Auxiliary Gutters and Associated Fittings. Every component including lengths, connectors, and fittings shall be UL listed.

C. Wireways shall be suitable for "lay -in" of conductors. All screws installed toward the inside shall be protected by spring nuts or otherwise guarded to prevent wire insulation

Page 57 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Conduits
City of Stockton 26 27 00 - 6

damage.

D. Wireways shall be JIC EMP -1 Sectional flanged oil -tight type with hinged covers and shall be 8 inches by 8 inches in cross Section unless otherwise specified. New wireways extending existing wireways shall be of the same manufacturer and type.

E. Non-Corrosive Areas: Wireways shall be with a rust inhibiting phosphatizing coating and gray baked enamel finish. All hardware shall be plated to prevent corrosion and painted to match adjoining surface.

F. Corrosive or NEMA 4X Areas: Wireways shall be NEMA 4X 316 stainless steel. Non - Metallic wireways may be used when approved by Engineer in writing.

2.04 CONDUIT SEAL
A. Conduit seal shall provide high adhesion and moisture protection. Seal shall absorb cable-filling material and be re -enterable. Conduit seal shall be 3M 8882 High Gel re - enterable encapsulant, or approved equal.

PART 3 EXECUTION

3.01 CONDUIT AND RACEWAY INSTALLATION
A. Conduit and Raceway Requirements:

1. Install an accessible raceway and conduit system for connection of all boxes, panelboards, cabinets, and equipment.

2. All conduit and raceway shall be the type and size as shown on Conduit and Wire Routing Schedule. In no case shall the conduit size be smaller than that shown.

3. Conduits connected to boxes, cabinets, etc., outdoors, exposed to weather or in areas subject to excessive moisture shall be fitted with watertight sealing hubs of steel or malleable iron with sealing ring and insulated throat, Myers hub, Thomas and Betts 370 Series, or approved equal.

4. Malleable iron threaded grounding bushing, with insulated throat and set screw solderless lugs, Appleton GIB-XXXLS-BC series shall be placed on the end of all rigid conduits. A ground bare copper wire shall bond each bushing to the enclosure ground bus.

5. Matching Existing Facilities: When new conduit are added to areas which are already painted, the conduit and its supports shall be painted to match the existing facilities. Where new conduit is used to replace existing conduit, the existing conduit and supports shall be removed, resulting blemishes shall be patched and repainted to match original conditions. Similarly, if existing conduits are to be reused and rerouted, resulting blemishes shall be corrected in the same manner.

6. Contractor is to remove and waste all unused wire associated with existing

Page 58 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Conduits
City of Stockton 26 27 00 - 7

conduits reused for new work.

7. When existing conduits have new wire pulled to existing equipment, the Contractor is responsible for reconnecting all terminations to these equipment.

8. Contractor to remove and waste all conduit and wire associated with removal or demolition of equipment.

9. Equipment to be replaced with new shall have new flex conduits installed and wire reconnected by Contractor.

B. Exposed Conduit:

1. All exposed conduits shall be run in straight lines parallel to column lines, walls or beams. Where conduits are grouped, the bends and fittings shall be installed so as to present an orderly appearance. Unnecessary bending or offsets shall be avoided. Conduits shall be kept at least 12 inches away from heating devices or similar equipment.

2. Supports for exposed conduit shall be in accordance with Title 24, CAC.

3. Support rigid conduits at 8 feet intervals and PVC conduits at 4 feet intervals.

Support all conduits within 1 foot of boxes or changes in direction. Use riser supports with clamps for vertical conduit risers.

4. For single conduit runs, use pipe straps or suspend from ceiling with single conduit hangers. Single hole malleable iron clamps with backplates may be used for horizontal runs on vertical surfaces. Perforated strap (plumber's tape), not acceptable.

5. For multiple conduit runs, group conduits together and support from ceiling by means of trapeze hangers. Wall brackets or unistrut supports shall be used for conduit runs on vertical surfaces. Clamp each conduit to trapeze or support, using conduit clamp.

6. Fasten hanger rods to structural steel members with beam clamps or to concrete inserts set flush with surface. Install reinforcing rod through opening in concrete insert.

7. Exposed conduit shall be supported rigidly in place. All exposed conduit shall include, where required, the drilling of holes in the bottom or sides of enclosures.

The Contractor shall thoroughly examine work prior to drilling to avoid drilling into components within enclosures.

C. Conduits in Concrete Slabs:

1. Conduits may be installed in structural slabs, or in slabs on grade, having the following minimum thickness: 2½" thick for ½" conduit, 4½" thick for ¾" conduit, and 5" thick for 1" conduit.

2. Maintain a minimum of two-inches of clearance between conduits and any

Page 59 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Conduits
City of Stockton 26 27 00 - 8

reinforcement bars. In structural slabs, place conduits carefully between upper and lower layers of steel. In prestressed concrete slab construction, place conduits in center of slab and do not support from prestressed steel.

3. Space conduits to maintain structural integrity of slabs.

4. Place conduits running parallel to slab supports (beams, columns, walls, etc.) not less than 12" from such supports.

5. Where floor slab is in direct contact with earth or fill, rigid steel conduit may be embedded in concrete blister below bottom of slab with 2 -inch minimum of concrete cover.

6. Runs of conduit to be embedded in concrete shall be rigidly supported in their proper positions while concrete is being placed. Place conduit separators every 4 feet on centers and securely anchor to prevent movement. Ends of conduits shall be plugged or capped during construction to prevent the entrance of concrete or other foreign matter. Connections shall be checked for tightness before being embedded.

D. Underground Conduits:

1. Buried conduit shall be placed at least 24 inches below grade and be located to avoid interference with other underground piping, foundations, etc. Conduit for Telephone and Power Utilities shall be set to depth as required by Utility engineered drawings and not less than 36” below grade.

2. All conduits entering or leaving the ground shall be sealed to prevent condensation of moisture inside the conduit. Conduit entrances in the bottom of MCCs, power distribution panels, switchboards, and enclosures shall project into the enclosure a minimum of two inches to prevent water from entering conduits.

3. Conduit placed in concrete which is in contact with earth or water shall be adequately separated from the earth or water by at least 3" of concrete. Concrete encasement shall extend 4" above finished grade or into housekeeping pad at completion of each run.

4. Install expansion couplings in conduit runs crossing expansion or contraction joints in concrete. Expansion couplings shall be zinc coated and watertight.

5. Where other piping systems are encountered or being installed along a raceway route, maintain a 12 -inch-minimum vertical separation between raceways and other systems at crossings. Maintain a 12 -inch-minimum separation between raceways and other systems in parallel runs. Do not place raceways over valves or couplings in other piping systems. Refer conflicts with these requirements to the Owner's Representative for instructions before further work is done.

6. Underground conduits not encased shall have a minimum 4” sand bedding completely encircling the conduits.

E. Raceway Identification:

Page 60 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Conduits
City of Stockton 26 27 00 - 9

1. All conduits and raceways listed in Conduit and Wire Routing Schedule shall have conduit tags at both terminations of each conduit. All conduits and raceways listed in Conduit and Raceway Schedule shall be provided with conduit tags with tag numbers listed in schedule. All spare conduits shall be labeled.

2. All exposed conduit inside buildings entering/leaving panels and enclosures shall have conduit tags composed of tag tiles with tag holder where allowed by space.

Tag holder shall be secured to conduit using nylon cable ties on both ends. Tag tiles shall be Almetek Type EZ -V, or approved equal. Tag holder shall be Almetek Type TH, or approved equal.

3. Conduit terminating in walls shall be identified by stenciling the conduit number on the wall directly under the conduit.

4. When there is no space available to use tag ties, such as in Motor Control Centers with underground feed or for conduits outside of buildings, then the tag material shall be rigid laminated red phenolic with white lettering. The size of the tag shall be 2" diameter. No letters are allowed smaller than 7/16". Tags shall be heat and UV resistant, stain -proof, electrically non -conductive and non -corroding.

Securely fasten tags in place using UV rated plastic ty-wraps. Engrave the tags, on both sides, with the conduit number. Labeling shall be neatly installed for visibility and shall be clearly legible. Conduit tags shall be Brady Custom B-1, or approved equal.

5. Prior to encasement, concealment, backfilling of conduits, temporary conduit labels shall be provided at each end of conduit. Temporary conduit labels shall have ½-inch (minimum) lettering at all transition points. After encasement and concealment temporary conduit labels shall be placed at each exposed end.

6. Each conduit listed in Conduit and Wire Routing Schedule shall have permanent tags where it enters and also when it leaves an open transition point, junction boxes, terminal boxes, pullboxes, vaults, and manholes, etc.

7. All existing conduits listed in Conduit and Wire Routing Schedule reused for new work shall have new conduit tags installed at all transition boxes and endpoints.

F. Workmanship and Installation Requirements:

1. Where field changes are required, every precaution shall be taken to insure that the change is coordinated with other conduit, structural, plumbing, and piping work.

Information shall be obtained regarding the completed raceway runs to insure that there will be no interference when the raceway run is extended or revised. A complete record of such changes shall be made on the Record Contract Drawings.

2. Conduits shall be cut square, threaded and reamed to remove sharp or rough edges and burrs. No running threads will be allowed. Conduit joints and connections shall be made waterproof and rustproof by application of a noninsulating thread compound, such as white lead or graphite, and zinc sealing material. Each threaded joint shall be thoroughly cleaned to remove cutting oil before the compound is applied.

Page 61 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Conduits
City of Stockton 26 27 00 - 10

3. All bends and offsets, where required, shall either be made with factory made bends or shall be field bends made with a conduit bender designed specifically for use with the type of conduit to be bent. Elbows and bends for conduits shall be formed in the field and shall be reasonably free from flattened surfaces, indentations, or kinks. Avoid field bends and offsets where possible. Heating of conduit to facilitate bending shall not be acceptable. Metallic conduits shall be bent cold to prevent damage to the protective coating. All bending shall be gradual and be done smoothly to permit the pulling on insulated electrical wires and cables without incurring damage to the insulation or sheath. Radius of curvature shall be not less than that permitted by NEC.

4. Conduit shall be rigidly secured to panels and other electrical equipment terminal boxes with locknuts and bushings in such a manner that each system shall be electrically continuous throughout.

5. Flexible liquidtight metal conduit shall be used to provide flexible connections between the rigid system and motor conduit boxes or other equipment subject to vibration.

6. To reduce damage to the zinc coating, only strap type wrenches shall be used. All wrench marks, field cut threads, and all other places where the zinc coating is damaged, shall be repaired with zinc-rich galvanizing repair compound.

7. Special “Soft-Jaw” type pipe clamps shall be used to prevent damage to PVC - coated conduit while field threading and cutting to length.

8. Raceway shall be installed with necessary fittings and supports.

9. After installation of all conductors, all underground conduit ends into enclosures shall have a conduit seal placed around wires inside conduit.

10. Grout around conduit tie-ins entering walls of building structure for watertight seal.

11. Contractor shall limit the number of directional changes of the conduit to total no more than the equivalent of 270 degrees in any run between pull points. Where required for ease of pulling and as necessary to meet code, the Contractor shall supply and install junction or pullboxes even though not shown on Drawings at no additional cost to the Owner.

12. Install and equip conduits and fittings installed outdoors or in other wet locations, entering equipment from bottom unless necessary to enter from side, so as to prevent water from entering the equipment. Top entry of conduits into enclosures located outdoors or in other wet locations is not allowed.

13. Spare or Future Conduits:
a. Provide a braided yellow polypropylene pull ropes with 1’ distance markers, ¼” minimum size.
b. Provide a waterproof label on each end of the pull cords to

Page 62 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Conduits
City of Stockton 26 27 00 - 11

indicate the destination of the other end.
c. Provide caps on conduit ends to prevent entrance of dirt or insects.

14. Contractor shall neatly bundle all new and reused wires with ty-wraps.

15. Conduit stubs for future use shall be capped with coupling, nipple, and plug.

16. Seal all conduits to prevent water traveling through conduits into buildings, junction boxes, underground facilities, electrical enclosures, panels, instruments or any other boxes that house electrical and instrumentation components. Install conduit drain boxes and plug conduit interior to form an effective barrier to keep out water traveling into equipment located below grade.

17. Conduit between vibrating equipment and outlet boxes or conduits shall be liquid tight flexible electrical conduits.

18. Whenever possible, make bends for exposed conduit stub-ups completely below the surface. Make stubs vertical and arrange neatly.

19. Where conduits turn up in accessible floor areas or under removable partitions, install coupling flush with finish floor surface (exclusive of floor covering). Provide flush threaded plug in this coupling where conduit is not to be extended.

20. For flush mounted panels, run empty conduits from panel to accessible spaces above. Install a minimum of one ¾" conduit for every 3 single pole spare circuit breakers or spaces, or fraction thereof.

21. Running Threads: Do not use running threads. Where such device is needed, use rain tight unions or concrete tight couplings.

22. The entire electrical raceway system shall be bonded and form a continuous metallic electrical conductor from service point to every box and shall be terminated with ground bushings connected to the ground bus. Conduits entering enclosures shall be fitted with insulated grounding bushing. All grounding bushings shall be tied to the grounding system with properly sized bonding conductors per the NEC Code.

23. Connection to steel conduit from PVC shall be made with approved threaded adapters.

24. All conduits which are installed shall be capped during construction to prevent the entrance of foreign material.

25. Secure hangers, brackets, conduit straps, supports and electrical equipment by means of toggle bolts on hollow masonry; expansion shields and machine screws or standard preset inserts on concrete or solid masonry; machine screws or bolts on metal surfaces; wood screws on wood construction. Wood or fiber plugs or concrete nails are not acceptable.

G. Warning Tapes:

Page 63 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Conduits
City of Stockton 26 27 00 - 12

1. Bury warning tapes approximately 12 inches above all underground concrete - encased duct banks and other conduit runs over 100’ in length. Align parallel to and within 3 inches of the centerline of the conduit or duct bank.

2. Plastic tape shall be colored for particular underground service, 6 -inch minimum width, utilize tape made of material resistant to corrosive soil. Use red tape for “Electric” service and orange tape for “Communication” service. Use tape with printed wording listing type of service. Manufacturers and types: ITT Blackburn, Griffolyn Co., Terra-Tape, or equivalent.

H. Cutting and Patching:

1. The Contractor shall do all core drilling, cutting, and patching required to install his work at no additional cost to the Owner. Core drilling, cutting, and patching is considered standard work to be done at existing facilities, therefore, this work is not specifically called out on Drawings. Any core drilling or cutting which may impair the structure shall require prior approval by the Engineer. Core drilling, cutting, and patching shall be done only by skilled labor of the respective trades. All surfaces shall be restored to their original condition after core drilling, cutting, and patching and made watertight.

I. Excavation and Back Filling:

1. At all times during the excavation and backfilling, the Contractor shall provide barricades, fences, guard rails, etc., to safeguard authorized personnel, and the general public from excavated trenches.

2. Provide excavation and back filling for Utility power and telephone services, electrical, and instrumentation equipment foundations and trenches for conduits and ductbanks as necessary. Excavations, backfill and resurfacing of trench shall be in accordance with Division 2 site work.

a. Underground conduits outside of structures, excluding utility conduits, shall have a minimum cover of 24 inches. Utility power and telephone conduits shall have a minimum cover of 36 inches.
b. Trenches for all conduits below floor slabs and underground shall be excavated to the required depths. Conduits under floor slabs shall have trenches no deeper than is required to properly contain bends within walls.

c. All trenching and underground work shall be closely coordinated with the Owner and Engineer. Contractor shall be responsible for locating, and avoiding disruption of, all existing underground facilities such as gas lines, water lines, sewer, fire protection lines, and existing underground electrical facilities. Any damage caused by the Contractor must be repaired at the Contractor’s cost, to the satisfaction of the Owner. d. All trenching shall be done as to minimize disruption to normal plant or construction operations. All open trenches shall be suitably marked and/or protected to avoid any accidents or injuries to workers or plant personnel.
e. Where new electrical ducts intersect existing facilities, at essentially the same depth, Contractor shall gradually divert the electrical facilities

Page 64 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Conduits
City of Stockton 26 27 00 - 13

down, under, and back up around the existing facilities. f. Back filling shall be done only after conduits have been inspected by Owner.

g. All excavations shall be backfilled and resurfaced to match surfaces prior to and adjacent to excavation.

3.02 WARRANTY
A. Provide warranty as specified in Electrical Section 26 05 00 - Warranty.

END OF SECTION

Page 65 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Wiring Devices
City of Stockton 26 27 26 - 1

SECTION 26 27 26

WIRING DEVICES

1PART 1 GENERAL

1.01 SCOPE OF WORK
A. The Contractor shall install, ready for use, the receptacles, plugs, switches, boxes and appurtenances specified herein. This document describes the function and operation of the system and particular components, but does not necessarily describe all necessary devices.

All components and devices shall be furnished and installed as required to provide a complete operable and reliable system for accomplishing the functions and meeting the performance set forth hereinafter at no additional cost to the Owner.

B. Furnish all required labor, materials, project equipment, tools, construction equipment, safety equipment, transportation, test equipment, incidentals, and services to provide complete and operational wiring devices as shown on the Drawings, included in these Specifications, or required for fully operating facilities.

C. Work includes that specified in Division 26 00 00.

D. The wiring devices scope of work includes:

1. Provide and install miscellaneous wiring devices, conduits, field interconnection wiring, and associated hardware.

2. Provide all necessary hardware, fittings, and devices to connect the electrical equipment provided under other Sections.

1.02 SUBMITTALS AND DRAWINGS
A. Provide submittals and Drawings as specified in Electrical Section 26 05 03.

PART 2 MATERIALS

2.01 WIRING DEVICES
A. General: Wiring devices shall be UL approved for the current and voltage specified and shall comply with NEMA area rating.

B. Boxes:

1. Box dimensions shall be in accordance with size, quantity of conductors, and conduit clearances per NEC Article 314 requirements.

2. Boxes shall be located and placed according to Owner requirements.

3. All terminal and junction boxes shall be labeled identifying them by number shown on Contract Drawings engraved with ½” letters on nameplates meeting the

Page 66 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Wiring Devices
City of Stockton 26 27 26 - 2

requirements of section 26 05 02 Nameplates.

4. Non-Weatherproof Boxes:

a. Recessed boxes shall be flush with wall. Boxes for fixtures shall not be less than four (4) inches square or diameter. Boxes for switches and receptacles shall be two and one-eight inch (2-1/8) deep. Provide plaster rings or box cover adapters for the wall surface finish.
b. Surface boxes shall be cast ferrous, deep FD type.

5. Weatherproof Boxes:

a. Boxes located in NEMA 4X areas shall be stainless steel type rated NEMA 4X.

b. PVC-coated cast ferrous boxes may be used in place of stainless steel boxes, except where boxes contain devices on cover. Boxes shall be deep, FD type. Single gang boxes shall have cast hubs.

6. Explosion proof Boxes:
a. Boxes shall be rated for Class 1, Division 1 or 2 and weatherproof locations.

C. Switches:

1. General purpose switches shall be manufactured in accordance with UL 20.

Switches shall be single pole, rated 20 amps, at 277 VAC. Bodies shall be of ivory phenolic compound supported by mounting strap having plaster ears.

Switches shall have copper alloy contact arm with silver cadmium oxide contacts.

Switches shall have slotted terminal screws and a separate green grounding screw. Furnish Hubbell 1221, Leviton, or approved equal.

2. Special purpose switches shall be provided with the amperage, voltage, and configuration as shown on the Drawings. Switches used as motor disconnects for single phase motors shall be horsepower rated.

D. Receptacles:

1. General purpose receptacles shall be duplex and rated 20 amps, at 120 VAC, 2 pole, 3 wire grounding, NEMA 5-20R configuration, Specification grade, and side wired to screw terminals. Face color shall be brown in industrial areas and white or ivory in finished areas. General purpose receptacles shall be Bryant, Hubbell, or approved equal.

2. GFI (ground fault circuit interrupting) receptacles shall be "Specification grade".

GFI receptacles shall be duplex, 20A, 120V, with "test" and "reset" buttons with shallow design for mounting and standard screw terminals for direct wiring.

Receptacles shall be designed, manufactured, and tested to prevent nuisance tripping from voltage spikes, RFI, EMI, or electronic component failures. Chaining multiple receptacles from one GFI unit is not acceptable. GFI receptacles shall be

Page 67 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Wiring Devices
City of Stockton 26 27 26 - 3

Arrow-Hart, Leviton, or approved equal.

3. Four in One receptacles (4 each 20A-125V receptacles in one housing, shall mount on a single gang box without additional adapters). Four in One receptacles shall be Leviton 21254, Hubbell, or approved equal.

E. Device Plates and Covers:

1. Non-Weatherproof general purpose device plates and covers shall be stainless steel. Plates or covers shall be attached with stainless steel screws. Exception:

Device plates & covers within reach of sinks & other wet areas shall have beige plastic covers with plastic screws.

2. Device plates and covers for cast metal boxes shall be same material as the box.

3. PVC coated cast boxes shall have PVC coated cast covers.

4. Weatherproof switch, outlet, and receptacle boxes shall be fitted with cast aluminum gasketed cover rated for wet locations. Each receptacle access cover shall have a gasketed spring door to maintain the weatherproof integrity with plug inserted in accordance with NEC 406.8 for unattended locations. Screws and hinge springs shall be stainless steel. Weatherproof access covers shall be Hubbell, Tay Mac, Crouse -Hinds, or approved equal.

5. Receptacle and light switch plates shall be stamped or engraved as specified in Section 26 05 02 Nameplates.

PART 3 EXECUTION

3.01 WORKMANSHIP
A. All work in this Section shall conform to the codes and standards specified in Section 26 05 00- Electrical.

B. The Supplier shall employ personnel that are skilled and experienced in the installation of receptacles, plugs, switches, appurtenances, accessories, and assemblies. All installation labor shall be performed by qualified personnel who have had experience on similar projects. Provide first class workmanship for all installations.

C. Ensure that all equipment and materials fit properly in their installations.

D. Perform any required work to correct improper installations at no additional expense to the Owner.

3.02 INSTALLATION
A. System:

1. Install all products per Electrical Section 26 05 00 - Installation, General.

2. Keep boxes, and other openings closed during construction to prevent entry of

Page 68 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Wiring Devices
City of Stockton 26 27 26 - 4

foreign matter. Cover devices and boxes to protect them against dirt, paint, water, chemical, or mechanical damage before and during construction period.

Restore to original condition apparatus or equipment damaged prior to final acceptance. Protect bright finished surfaces and similar items until in service. No rust or damage will be permitted.

3. All receptacles shall be tested by Contractor in presence of Owner for correct connections utilizing a plug-in ground, line and neutral test light plug.

4. Boxes shall be relocated at no additional cost to Owner as directed by Engineer when a conflict occurs in the box placement shown on Contract drawings and other building appurances.

5. Provide and install necessary wires in surface mount 3/4" (min) EMT conduit for lighting and receptacle arrangement as shown on Contract drawings.

6. Conductors shall be copper type THHN, #12 AWG (minimum).

7. Mount conduits using single bolt galvanized pipe straps and clamp back spacers.

8. Use stainless steel expansion wedge anchors or epoxy anchors as necessary for device mounting.

9. Provide and install all device boxes, junction boxes, receptacles, switches, and covers.

10. Receptacles to be ground fault interrupter (GFI) type and weatherproof (WP) where shown.

11. See electrical symbols and abbreviations drawing for symbol definition.

12. All work shall conform to local codes and National Electric Code (NEC).

B. Device Mounting Heights:

1. Mounting heights of fixtures and devices shall be as follows unless otherwise indicated or when height has to be adjusted to be over or under counter tops.

a. Wall switches => 48 inches
b. Convenience outlets => 18 inches finished
areas
=> 24 inches non-
finished areas
c. Telephone outlets => 54 inches
d. Bracket fixtures => 7 feet 6 inches
C. Cutting and Patching:

1. The Contractor shall do all cutting and patching required to install his work. Any cutting which may impair the structure shall require prior approval by the Engineer. Cutting and patching shall be done only by skilled labor of the respective trades. All surfaces shall be restored and painted to their original

Page 69 of 70 ends

EXHIBIT 2

Wilson Way Pump Station Wiring Devices
City of Stockton 26 27 26 - 5

condition after cutting and patching.

D. Boxes:

1. Leave no unused opening in any box. Install close -up plugs as required to seal openings.

2. All spare and/or empty conduits shall terminate in a device box.

3. Use stainless steel boxes when box must support door mounted devices.

4. In NEMA 4X areas boxes are to be spaced ¼ -inch minimum from walls using stainless steel, nylon or plastic spacers. Regular steel washers are not considered an approved spacer.

3.03 WARRANTY
A. Provide warranty as specified in Electrical Section 26 05 00 - Warranty.

END OF SECTION

Page 70 of 70 ends