Resolution No.

STOCKTON CITY COUNCIL
RESOLUTION AUTHORIZING CONTRACT CHANGE ORDER NO. 1 FOR $5,714,565 WITH GATEWAY PACIFIC CONTRACTORS, INC. FOR EFFICIENCY AND CAPACITY IMPROVEMENTS TO THE GROUNDWATER RECHARGE BASINS In 2012, the Municipal Utilities Department (MUD) dedicated the Delta Water Supply Project (DWSP) to provide a supplemental surface water supply to the City of Stockton and protect the groundwater basin through conjunctive management; and A groundwater recharge project will make use of available water under the City’s Water Right Permit 21176, contract supply from Woodbridge Irrigation District, and potentially other water sources; and On September 10, 2024, the City awarded a design-build contract to Gateway Pacific Contractors, Inc. to design and construct the recharge basins; and Contract Change Order No. 1 includes design enhancements to the groundwater recharge basins to improve operational flexibility, reliability, and overall recharge capacity, along with enhancements to the visitor center to showcase the regional importance of the City’s investment in groundwater recharge, long-term water sustainability, and habitat conservation; and MUD staff recommends the approval of Contract Change Order No. 1 with Gateway Pacific Contractors, Inc., in the amount of $5,714,565, for a total not to exceed $17,197,813; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF STOCKTON, AS FOLLOWS:

Contract Change Order No. 1 with Gateway Pacific Contractors, Inc., for $5,714,565, is hereby approved, and the City Manager is authorized and directed to execute same, a copy of which is attached as Exhibit 1 and incorporated by this reference. //
//
//
//
//
//
//
//
The City Manager or designee is hereby authorized to take appropriate and necessary actions to carry out the purpose and intent of this Resolution.

PASSED, APPROVED, and ADOPTED August 12, 2025 .

CHRISTINA FUGAZI
Mayor of the City of Stockton
ATTEST:

KATHERINE ROLAND, CMC, CPMC
City Clerk of the City of Stockton