Resolution No.
STOCKTON CITY COUNCIL
RESOLUTION APPROVING THE FILING OF NOTICE OF EXEMPTION NOE36-25, APPROVING THE PROJECT PLANS AND SPECIFICATIONS, AND AWARDING A $381,497 CONSTRUCTION CONTRACT TO BOCKMON & WOODY ELECTRIC CO., INC. FOR THE ALEXANDRIA & 14-MILE STORM PUMP STATION ELECTRICAL UPGRADES The Alexandria & Fourteen Mile Storm Pump Station conveys stormwater from the adjacent roadways within the Quail Lakes area and discharges into Fourteen Mile Slough; and During a storm event in January 2023, the stormwater station pump engine overheated and caught fire after running for an extended period due to the excessive rainfall; and A new electric motor will replace the antiquated engine, but before it is installed, it is necessary to upgrade the pump station electrical infrastructure to support the increased power demand; and On July 3, 2025, the City Clerk opened, examined, and publicly declared the sealed bids offered for the Alexandria & Fourteen Mile Storm Pump Station Electrical Upgrades; and Bockmon & Woody Electric Co., Inc. submitted the lowest bid in the amount of $381,497; and The bid submitted by Bockmon & Woody Electric Co., Inc. is regular and responsive in all aspects; and The electrical upgrades of the pump station as described in the proposed Construction Contract for the Alexandria & Fourteen Mile Storm Pump Station Electrical Upgrades (Exhibit 3), the “project”, satisfies the 2040 Stockton General Plan (Land Use Policy 6.3) because it improves existing utility services to ensure that all neighborhoods have access to well-maintained public facilities and utilities that meet community service needs; and The project is exempt from California Environmental Quality Act (CEQA) requirements as specified under Article 19, Section 15301 (b), of the CEQA Guidelines; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF STOCKTON, AS FOLLOWS:
The filing of the Notice of Exemption No. NOE36-25 under CEQA for the Alexandria & Fourteen Mile Storm Pump Station Electrical Upgrades is hereby approved, and staff are authorized to file and post it in compliance with CEQA Guidelines section 15062, a copy of which is attached as Exhibit 1 and incorporated by this reference.
The project Plans and Specifications for the Alexandria & Fourteen Mile Storm Pump Station Electrical Upgrades are hereby approved, a copy of which is attached as Exhibit 2 and incorporated by this reference.
Transfer $381,497 from the Storm Drain Systems Emergency Project No. US24005 to the Alexandria & Fourteen Mile Storm Pump Station Electrical Upgrades Project No. US24001.
The City Manager is hereby authorized to execute a $381,497 construction contract with Bockmon & Woody Electric Co., Inc. of Stockton, California, for the Alexandria & Fourteen Mile Storm Pump Station Electrical Upgrades, a copy of which is attached as Exhibit 3 and incorporated by this reference.
The City Manager is hereby authorized to take appropriate and necessary actions to carry out the purpose and intent of this Resolution.
PASSED, APPROVED, and ADOPTED September 23, 2025 .
CHRISTINA FUGAZI
Mayor of the City of Stockton
ATTEST:
KATHERINE ROLAND, CMC, CPMC
City Clerk of the City of Stockton