Silver Lake Campground
Facility Condition
Assessment
Final Report
August 16, 2024

ATTACHMENT A

APPENDIX A
A5

ATTACHMENT A

APPENDIX A
A6
Table of Contents

EXECUTIVE SUMMARY
Introduction 3
Assessment Methodology 4
Evaluations and Findings 5
Facility Condition Index 5
FCI and Impact to Component Failure Risk and Staff 6
Priority Glossary 7
Summary of Evaluations and Findings 8
Facility Condition and Cost Summary 9
Site Map 10

APPENDIX
Appendix A - Site A
Appendix B - Cabin C1, C2, C3 B
Appendix C - Cabin L1, L2, L3 C
Appendix D - Cabin H1, H2, H3 D
Appendix E - Cabins E
Appendix F - Crafts F
Appendix G - Electrical G
Appendix H - Kitchen H
Appendix I - Lodge I
Appendix J - Manager’s Office J
Appendix K - Nurse K
Appendix L - Pop’s Garage L
Appendix M - Restroom M
Appendix N - Restrooms and Showers N
Appendix O - Reynold’s Memorial Museum O
Appendix P - Storage 1 P
Appendix Q - Storage 2 Q
Appendix R - Accessibility Report R

ATTACHMENT A

APPENDIX A
A7

Page 2 ends

CITY OF STOCKTON | FINAL REPORT
This page intentionally left blank.

ATTACHMENT A

APPENDIX A

A8
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page 3 Executive Summary
Introduction
On June 4th, 5th and the 7th Kitchell EAS conducted a complete Facility Condition Assessment (FCA) of the Silver Lake Campground located at 29981 Plasses Road in Pioneer, California. The facilities and elements assessed are listed below:

1. Cab
in A

2. Cab
in B1

3. Cab
in B2

4. Cab
in D

5. Cab
in E1

6. Cab
in E2

7. Cab
in F

8. Cab
in G1

9. Cab
in G2

10. Cab
in G3

11. Cab
in G4

12. Cab
in I

13. Cab
in J

14. Cab
in K

15. Cab
in M

16. Cab
in N

17. Cab
in O

18. Cab
in P

19. Cab
in Q1

20. Cab
in Q2

21. Cab
in R1

22. Cab
in R2

23. Cab
in S1

24. Cab
in S2

25. Cab
in S3

26. Cab
in S4

27. Cab
in T1

28. Cab
in T2

29. Cab
in T3

30. Cab
in T4

31. Cab
in T5

32. Cab
in T6

33. Cab
in U1

34. Cab
in U2

35. Cab
in U3

36. Cab
in V1

37. Cab
in V2

38. Cab
in V3

39. Cab
in W1

40. Cab
in W2

41. Cab
in W3

42. Cab
in X

43. Cab
in Y1

44. Cab
in Y2

45. Cab
in Z

46. Co
ok Shack (Ray)

47. Cr
afts

48. Ele
ctrical

49. Ki
tchen

50. Lod
ge

51. Man
ager’s Office

52. Nu
rse

53. Pop
’s Garage

54. Res
troom

55. Res
trooms and
Showers

56. Re
ynold’s Memorial
Museum

57. St
orage 1

58. St
orage 2

ATTACHMENT A

APPENDIX A
A9

Page 4 ends

CITY OF STOCKTON | FINAL REPORT
Assessment Methodology
In assessing the condition of the Silver Lake
Campground, Kitchell’s team of FCA professionals
identified those items in need of repair, retrofit, or
replacement necessary to preserve the existing facilities and enhance the safety and longevity of the facilities for the next five years. Budget estimates were developed
for observed deficiencies and were categorized with
priority groups ranging from “Immediate” to “Potential”.

The methodology used in this assessment included
a visual non-destructive inspection of the facilities
using ASTM standards (ASTM E2018-15) and
industry best-practices checklists; interviews with
maintenance personnel; analysis based on the available
documentation (original as-built drawings, precedent
studies, reports, and documents). Observed physical
deficiencies at each facility were assigned a budget-
level construction correction estimate.

Elements that were observed and assessed included
those in the following broad categories.

Site Elements
Visual examinations of the parking lot and grounds, and evaluation of the site, with respect to flood potential, were conducted. The systems included grading,
drainage, slope stabilization, protection, and erosion
control. For grading and drainage, Kitchell observed the site systems for removal of storm water and identified
any that appeared under-capacity or distressed. The
parking lots were observed for pavement, striping,
curbs, gutters and sidewalk damage, and obvious
access barriers. Landscaping, retaining walls, perimeter fences, gates, recreational facilities, playing fields, and playgrounds were also inspected.

Architectural Elements
Visual examinations of roof materials, flashings,
penetrations, skylights and other roof appurtenances
were conducted. Exterior walls, windows, and doors
were examined for irregularities, structural damage, and wear. Interior finishes were observed for deficiencies
and wear.

Mechanical, Electrical, Plumbing,
Fire Sprinkler Systems & Fire Alarm
Systems
Visual examinations of mechanical, electrical, plumbing, fire sprinklers and fire alarm systems to determine
capacities, condition and remaining useful life were
conducted. Reviewed electrical systems include power
distribution, emergency power, lighting systems, and
fire alarm. Reviewed mechanical systems include HVAC,
plumbing fixtures, visible waste and vent lines, pumps
and motors, and fire sprinkler systems.

Structural Assessment
The scope of the structural assessment was limited
to the visual observation and notation of apparent
structural deficiencies to identify items in need of repair or retrofit and did not include calculations or analysis.

Accessibility
A full accessibility assessment was completed and is
included in this report.

ATTACHMENT A

APPENDIX A

A10
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page 5 Evaluation and Findings
The assessment prioritized observed physical
deficiencies and recommendations into seven
categories. These priorities are a recommendation on
when the deficient condition should be addressed. This
is based on the best judgment that was made at the time of inspection and only on the condition of the system
or building component. The prioritization categories are defined in the Priority Glossary included at the end of this section.

Facility Condition Index
The Facility Condition Index (FCI) is an industry
standard asset management tool which measures
the “constructed asset’s condition at a specific point
in time” (US Federal Real Property Council, 2008). It
is a functional indicator resulting from an analysis of operational indicators to obtain an overview of a facility’s condition as a numerical value.

The Capital Renewal Cost is the sum of the current
capital improvement costs for an assessed facility. This cost is compared to the current replacement cost for the purpose of calculating an FCI, therefore, escalation is not considered.

The Total Capital Renewal Cost is the sum of all Capital Renewal Costs including escalation.

The Replacement Cost is the current replacement cost of the facility. The Replacement Cost is based on Kitchell’s experience designing and constructing similar facilities and includes the following: estimating contingency,
general conditions, overhead/profit, insurance, bonds,
construction contingency, architect/engineer fees,
construction management, permit, City administration,
etc.

The FCI number is obtained by adding all the Capital
Renewal Costs of any needed or outstanding repair,
renewal or upgrade requirement at a facility and dividing by the current Replacement Cost of the facility. The FCI describes the relative physical condition of the current facility versus a new facility using identical program, construction type, and building systems. In addition,
cost estimates take into consideration compliance with
current building code requirements.

City administration soft costs and fees for architecture/ engineering, construction management, permits,
and testing were accounted for using a 30% cost
increase factor applied to the deficiency costs. This
factor appears as a “Non Construction Cost” within
the individual facility deficiency tables. The General
Construction Factor and City Cost Index (CCI) are
additional factors included to adjust for the geographic location of the City.

Condition Index Grade
The Condition Index Grade Chart relates the FCI
score to a grade level and to the potential impacts
of the deficiencies. The narrative provides current
industry standard subjective benchmarks indicating
condition ratings for facilities with various FCI ranges.

A letter grade, “A”, “B”, “C” or “D”, has been added as a benchmark associating the facility’s condition with its respective FCI range.

ATTACHMENT A

APPENDIX A

A11

Page 6 ends

CITY OF STOCKTON | FINAL REPORT
Common Implications of FCI to Asset Portfolios
FCI Grade Impact to Facilities
and Components
Examples of
Component Issues
User Complaints and
Morale
Maintenance
Personnel Impact
Grade A
Good
(FCI 0 to

0.04)
Facilities will look clean
and functional.

Limited and
manageable
component and
equipment failure may
occur.

Repairs and replacement
are more of an aesthetic
or general nature, such
as wall painting, carpet
replacement, roof repair,
window caulking.

User complaints will be
low and manageable.

User morale will be
positive and evident.

Facilities
personnel time
will be devoted to
regular scheduled
maintenance.

Grade B
Fair
(FCI 0.05
to 0.10)
Facilities will begin to
show signs of wear.

More frequent compo-
nent and equipment
failure will occur.

R
epairs and replacement
of specific systems,
such as boiler, window
replacements, and
interior renovations.

User complaints will
occur with higher level
of frequency. User
morale may be affected.

Facilities personnel
time may at times
be diverted from
regular scheduled
maintenance.

Grade C
Poor
(FCI 0.11
to 0.30)
Facilities will look worn
with apparent and
increasing deterioration.

Frequent component
and equipment failure
may occur. Occasional
building shut down will
occur.

Replacement of
specific major systems
are required, such as
heating and plumbing
systems, complete
interior renovations,
building envelope
restoration.

Shut down may affect
users (i.e. roof or pipe
leakage).

User complaints will
be high with increased
level of frequency.

Concern about negative
user morale will be
raised and become
evident.

Facilities personnel
time will likely
be diverted from
regular scheduled
maintenance and
forced to “reactive”
mode.

Grade D
Critical
(FCI over

0.31)
Facilities will look
worn with obvious
deterioration.

Equipment failure
will occur frequently
.

Occasional building
shut down will likely
occur. Management
risk is high. Health and
safety issues figure
prominently.

Replacement of multiple
systems required (i.e.
mechanical, electrical,
architectural and
structural). Building
heating system failure.

Evacuation due to
unaddressed roof
leakage.

Structural issues
including envelope
replacement.

User complaints will
be very high with an
unmanageable level
of frequency. Lack of
maintenance will affect
user attitudes and
morale.

Facilities personnel
will not able to
provide regular
scheduled
maintenance due
to high levels of
“reactive” calls.

Facility Condition Index and Impact to Component Failure Risk and Staff

ATTACHMENT A

APPENDIX A
A12
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page 7 Priority Glossary
Priority Description Explanation
1 Immediate
0 - 1 Y ears
Conditions in this category require immediate action to a) correct a cited safety hazard, b) stop accelerated deterioration, and/or c) return the element/asset to operation. Deficiencies in this category should be addressed in 0-12 Months. The Escalation Factor in this category is 5% 2 Crucial
1 to 2 Y ears
Conditions in this category, if not corrected expeditiously, will become critical within a year. Situations within this category include a) intermittent operations, b) rapid deterioration, and c) potential life safety hazards. Deficiencies in this category should be addressed in Y ears 1-2.

The Escalation Factor in this category is 10%.
3 Impending
2 to 3 Y ears
Conditions in this category require appropriate attention to preclude predictable deterioration or potential downtime and the associated damage or higher costs if deferred further. Deficiencies in this category should be addressed in Y ears 2-3. The Escalation Factor in this category is 15%.
4 Necessary
3 to 4 Y ears
Conditions in this category require long-term consideration within Y ears 3-4. They include items that represent a sensible improvement to existing conditions. The Escalation Factor in this category is 20% 5 Potential
4 to 5 Y ears
Conditions in this category require long-term consideration within Y ears 4-5. They include items that present a potential need in the future. The Escalation Factor in this category is 25%.

ATTACHMENT A

APPENDIX A

A13

Page 8 ends

CITY OF STOCKTON | FINAL REPORT
Summary of Evaluation and Findings
Details of each asset and/or deficiency were captured and recorded in the FCA database. The tables below provide the value of current needs in the coming years 1 through 5 and the total facility replacement cost (“as is”) which are used to factor the facility condition index (FCI) and grade.

The assessment determined that the financial impact to the City to address the identified deficiencies for the Silver Lake Campground in both current (2024) cost and escalated cost over the next five years to address are summarized in the following table and chart:

ATTACHMENT A

APPENDIX A
A14
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page 9 Facility Condition and Cost Summary
Priority 1
5% Escalation
Priority 2
10% Escalation
Priority 3
15% Escalation
Priority 4
20% Escalation
Priority 5
25% Escalation
Cabin A $ 65,149 $ 68,410 $ - $ - $ - $ - $ 68,410 $ 112,000 0.582 D CRITICAL Cabin B1 $ 64,338 $ 67,560 $ - $ - $ - $ - $ 67,560 $ 112,000 0.574 D CRITICAL Cabin B2 $ 51,364 $ 53,940 $ - $ - $ - $ - $ 53,940 $ 112,000 0.459 D CRITICAL Cabin C1-C2-C3 $ 78,626 $ 82,570 $ - $ - $ - $ - $ 82,570 $ 362,000 0.217 C POOR Cabin D $ 55,531 $ 58,310 $ - $ - $ - $ - $ 58,310 $ 112,000 0.496 D CRITICAL Cabin E1 $ 59,082 $ 62,040 $ - $ - $ - $ - $ 62,040 $ 112,000 0.528 D CRITICAL Cabin E2 $ 46,891 $ 49,240 $ - $ - $ - $ - $ 49,240 $ 112,000 0.419 D CRITICAL Cabin F $ 48,988 $ 51,440 $ - $ - $ - $ - $ 51,440 $ 112,000 0.437 D CRITICAL Cabin G1 $ 57,152 $ 60,010 $ - $ - $ - $ - $ 60,010 $ 112,000 0.510 D CRITICAL Cabin G2 $ 51,952 $ 54,550 $ - $ - $ - $ - $ 54,550 $ 112,000 0.464 D CRITICAL Cabin G3 $ 43,871 $ 46,070 $ - $ - $ - $ - $ 46,070 $ 112,000 0.392 D CRITICAL Cabin G4 $ 43,256 $ 45,420 $ - $ - $ - $ - $ 45,420 $ 112,000 0.386 D CRITICAL Cabin H1-H2-H3 $ 130,522 $ 137,050 $ - $ - $ - $ - $ 137,050 $ 271,000 0.482 D CRITICAL Cabin I $ 59,948 $ 62,950 $ - $ - $ - $ - $ 62,950 $ 112,000 0.535 D CRITICAL Cabin J $ 51,616 $ 54,200 $ - $ - $ - $ - $ 54,200 $ 112,000 0.461 D CRITICAL Cabin K $ 51,952 $ 54,550 $ - $ - $ - $ - $ 54,550 $ 112,000 0.464 D CRITICAL Cabin L1-L2-L3 $ 109,663 $ 115,160 $ - $ - $ - $ - $ 115,160 $ 271,000 0.405 D CRITICAL Cabin M $ 58,718 $ 61,660 $ - $ - $ - $ - $ 61,660 $ 112,000 0.524 D CRITICAL Cabin M2 $ 43,368 $ 45,540 $ - $ - $ - $ - $ 45,540 $ 112,000 0.387 D CRITICAL Cabin N $ 50,721 $ 53,260 $ - $ - $ - $ - $ 53,260 $ 112,000 0.453 D CRITICAL Cabin O $ 50,190 $ 52,700 $ - $ - $ - $ - $ 52,700 $ 112,000 0.448 D CRITICAL Cabin P $ 50,721 $ 53,260 $ - $ - $ - $ - $ 53,260 $ 112,000 0.453 D CRITICAL Cabin Q1 $ 53,965 $ 56,660 $ - $ - $ - $ - $ 56,660 $ 112,000 0.482 D CRITICAL Cabin Q2 $ 43,368 $ 45,540 $ - $ - $ - $ - $ 45,540 $ 112,000 0.387 D CRITICAL Cabin R1 $ 50,721 $ 53,260 $ - $ - $ - $ - $ 53,260 $ 112,000 0.453 D CRITICAL Cabin R2 $ 48,345 $ 50,760 $ - $ - $ - $ - $ 50,760 $ 112,000 0.432 D CRITICAL Cabin S1 $ 59,781 $ 62,770 $ - $ - $ - $ - $ 62,770 $ 112,000 0.534 D CRITICAL Cabin S2 $ 48,345 $ 50,760 $ - $ - $ - $ - $ 50,760 $ 112,000 0.432 D CRITICAL Cabin S3 $ 43,368 $ 45,540 $ - $ - $ - $ - $ 45,540 $ 112,000 0.387 D CRITICAL Cabin S4 $ 21,027 $ 22,080 $ - $ - $ - $ - $ 22,080 $ 112,000 0.188 C POOR Cabin T1 $ 57,684 $ 60,560 $ - $ - $ - $ - $ 60,560 $ 112,000 0.515 D CRITICAL Cabin T2 $ 58,718 $ 61,660 $ - $ - $ - $ - $ 61,660 $ 112,000 0.524 D CRITICAL Cabin T3 $ 42,249 $ 44,360 $ - $ - $ - $ - $ 44,360 $ 112,000 0.377 D CRITICAL Cabin T4 $ 43,368 $ 45,540 $ - $ - $ - $ - $ 45,540 $ 112,000 0.387 D CRITICAL Cabin T5 $ 43,451 $ 45,620 $ - $ - $ - $ - $ 45,620 $ 112,000 0.388 D CRITICAL Cabin T6 $ 48,988 $ 51,440 $ - $ - $ - $ - $ 51,440 $ 112,000 0.437 D CRITICAL Cabin U1 $ 57,152 $ 60,010 $ - $ - $ - $ - $ 60,010 $ 112,000 0.510 D CRITICAL Cabin U2 $ 50,721 $ 53,260 $ - $ - $ - $ - $ 53,260 $ 112,000 0.453 D CRITICAL Cabin U3 $ 50,721 $ 53,260 $ - $ - $ - $ - $ 53,260 $ 112,000 0.453 D CRITICAL Cabin V1 $ 43,256 $ 45,420 $ - $ - $ - $ - $ 45,420 $ 112,000 0.386 D CRITICAL Cabin V2 $ 43,256 $ 45,420 $ - $ - $ - $ - $ 45,420 $ 112,000 0.386 D CRITICAL Cabin V3 $ 45,129 $ 47,390 $ - $ - $ - $ - $ 47,390 $ 112,000 0.403 D CRITICAL Cabin W1 $ 43,871 $ 46,070 $ - $ - $ - $ - $ 46,070 $ 112,000 0.392 D CRITICAL Cabin W2 $ 43,256 $ 45,420 $ - $ - $ - $ - $ 45,420 $ 112,000 0.386 D CRITICAL Cabin W3 $ 43,256 $ 45,420 $ - $ - $ - $ - $ 45,420 $ 112,000 0.386 D CRITICAL Cabin X $ 65,121 $ 68,370 $ - $ - $ - $ - $ 68,370 $ 112,000 0.581 D CRITICAL Cabin Y1 $ 51,225 $ 53,780 $ - $ - $ - $ - $ 53,780 $ 112,000 0.457 D CRITICAL Cabin Y2 $ 28,464 $ 29,890 $ - $ - $ - $ - $ 29,890 $ 112,000 0.254 C POOR Cabin Z $ 50,749 $ 53,290 $ - $ - $ - $ - $ 53,290 $ 112,000 0.453 D CRITICAL Cook Shack (Ray) $ 39,593 $ 41,570 $ - $ - $ - $ - $ 41,570 $ 112,000 0.354 D CRITICAL Crafts $ 75,299 $ 79,060 $ - $ - $ - $ - $ 79,060 $ 245,000 0.307 C POOR Electrical $ 45,912 $ 48,210 $ - $ - $ - $ - $ 48,210 $ 350,000 0.131 C POOR Kitchen $ 157,141 $ 165,010 $ - $ - $ - $ - $ 165,010 $ 1,996,000 0.079 B FAIR Lodge $ 256,179 $ 269,000 $ - $ - $ - $ - $ 269,000 $ 2,311,000 0.111 C POOR Managers Office $ 127,335 $ 133,690 $ - $ - $ - $ - $ 133,690 $ 607,000 0.210 C POOR Nurse $ 44,346 $ 46,570 $ - $ - $ - $ - $ 46,570 $ 438,000 0.101 B FAIR Pops Garage $ 70,434 $ 73,960 $ - $ - $ - $ - $ 73,960 $ 187,000 0.377 D CRITICAL Restroom $ 74,768 $ 78,510 $ - $ - $ - $ - $ 78,510 $ 327,000 0.229 C POOR Restrooms and Showers $ 289,285 $ 303,750 $ - $ - $ - $ - $ 303,750 $ 3,874,000 0.075 B FAIR Reynolds Memorial Museum $ 78,011 $ 81,920 $ - $ - $ - $ - $ 81,920 $ 1,067,000 0.073 B FAIR Site $ 1,622,300 $ 1,703,420 $ - $ - $ - $ - $ 1,703,420 $ 4,337,000 0.374 D CRITICAL Storage 1 $ 83,911 $ 88,110 $ - $ - $ - $ - $ 88,110 $ 347,000 0.242 C POOR Storage 2 $ 69,000 $ - $ - $ - $ - $ - $ - $ 69,000 N/A D CRITICAL $5,636,688 $5,846,220 $0 $0 $0 $0 $5,846,220 $22,323,000

Condition
Score
Condition
Rating
Capital Renewal Costs by Priority
Location Current Capital
Renewal Cost
Total Capital
Renewal Cost
(Escalated)
Replacement
Costs FCI
6/28/2024 Page 1

ATTACHMENT A

APPENDIX A

A15
Feet
1:1200
2001000 50
Site Map

ATTACHMENT A

APPENDIX A

A16
DETAILED REPORT | SITE
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page A1 Y ear Built (approximate): 1950
Total Building Area: 16 Acres
FCA Summary
Capital Renewal Cost: $1,622,300
FCI: 0.374
Condition Score: D
Condition Rating: Critical
Replacement Cost: $4,337,000
Replacement Cost/SF: $6
Statistics
Address: 29981 Plasse Road, Pioneer, CA 95666
Site
Detailed Report

ATTACHMENT A

APPENDIX A

A17
Page A2
DETAILED REPORT | SITE
CITY OF STOCKTON | FINAL REPORT
General
Silver Lake Campground is an approximately 16-acre
campground located at 29981 Plasse Road in Pioneer,
California. Based on the available information, it
appears the campground was originally constructed in
the 1950’s and is currently owned and operated by the
City of Stockton.

The campground includes 50 wood-framed cabins that
can sleep three to four campers and staff. In addition, the campground includes a manager’s office, nurse’s
cabin, crafts cabin, restroom and shower building,
electrical building, maintenance cabin (Pop’s Garage),
kitchen building, restroom building, lodge, two storage buildings and a timber building used as a museum
(Reynold’s Memorial Museum).

In addition, the campground includes the following
site elements: a paved parking area; paved pedestrian
walkways from the parking area and manager’s
office to the kitchen, lodge, and restroom buildings;
unimproved pedestrian trails; concrete shuffleboard
and volleyball court; several concrete tent and teepee
platforms and a concrete RV parking area.

Overall, the site appears to be in poor condition. Fallen branches, fallen trees, debris and trash were observed
throughout the site making access around the site
difficult in some areas. Conditions and deficiencies of specific elements are noted in the following sections.

Parking Area
The asphalt concrete (AC) pavement in the parking
areas is showing signs of cracking, age and wear and
should be replaced within the next five years.

Narratives
Pedestrian Walkways
The AC paved pedestrian walkways appear to be in
good condition and functional with only some minor
cracking noted in some areas. For the unimproved
trails, a general site cleanup should be sufficient.

Pedestrian Bridges
There are three wooden bridges that cross two
streams that run through the property. The bridges
have concrete or metal supports at each abutment with
wood spans and decking. There are attachments to
install future handrails on each side. Two of the three bridges appear to be in good condition; however,
the wood beam for the bridge to Cabins X, Y1 and
Y2 is damaged and failing and should be repaired or
replaced.

Site Domestic Water Distribution
Based on the information provided, domestic water is
provided to the site from a 19,000-gallon storage tank
located offsite at an elevation of approximately 7,340
feet. The water tank was not assessed as part of this
report. Domestic water is distributed throughout the
site and specific buildings via buried steel pipe. Hose bibs are located throughout the site and provide a
hook up for fire hoses in a fire emergency. It was noted that at some locations, the steel pipe has become
exposed due to erosion. The exposed pipe appears to
be in fair condition considering its age but may cause
a tripping hazard and/or be easily damaged.

ATTACHMENT A

APPENDIX A

A18
DETAILED REPORT | SITE
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page A3 Site Propane Distribution
Propane is provided to several buildings via propane
tanks located throughout the site, usually immediately
adjacent to the building being supplied. All the tanks
do not appear to have been used or maintained
for some time and all have been disconnected. It is
recommended that the tanks be inspected and tested
prior to reconnection and use.

Site Wastewater and Septic System
Based on the information provided, the site is
served by a septic tank and leach field located at
the southeast side of the site with the septic located
at the northwest side of the leach field. During
the assessment, a manhole was located near the
concrete and asphalt steps. However, a Forest Service
inspection report from 2019 indicated that the tank
may also be located near Cabin T4.

The visual assessment of the leach field showed no
signs of failure; however, considering that the site has not been used for several years and the water appears
to have been shut off to the site, this would be a
difficult deficiency to note.

The EPA estimates a septic system expected useful
life to be between 15 to 40 years depending on the
material and maintenance. Based on the assumed age
of the campground and facilities, it is likely the system is past its expected useful life (EUL). It is recommended that a full test and inspection of the septic system and tank be completed.

Site Electrical Distribution System and
Lighting
Electrical power is provided by a propane powered
generator located in the Electrical building and
distributed throughout the site via the main
panelboard located in Pop’s Garage and several load
centers located throughout the site. Nearly all of the
panelboards and external wall-mounted load centers
are damaged and/or appear past their expected useful
life.

Site Lighting
Site lighting is provided by wall-mounted light
fixtures on most of the cabins and buildings as well
as pole and tree mounted light fixtures. All of the site light fixtures are damaged and/or appear past their
expected useful life.

ATTACHMENT A

APPENDIX A

A19
Page A4
DETAILED REPORT | SITE
CITY OF STOCKTON | FINAL REPORT
Conclusion
For the Silver Lake Campground site, this chart summarizes the Capital Renewal Costs by Priority with their associated costs and escalation based on the time period anticipated for implementation.

Detailed Capital Renewal Costs by Priority, broken down by Building System Class, are included in the following CIP Deficiency Cost Summary. This chart summarizes all of the more detailed information from the subsequent Deficiency Table. To supplement the Deficiency Table, representative photographs and descriptions are included. Buildings with a zero cost noted in each Priority will not have a Deficiency Table attached, as there were no deficiencies noted in this assessment.

Priority 1 Priorit y 2 Priorit y 3 Priorit y 4 Priorit y 5 8% Escalation 13% Escalation 18% Escalation 23% Escalation 28% Escalation Site $88,110 $0 $0 $0 $0 $88,110
Total $88,110 $0 $0 $0 $0 $88,110
100.00% 0.00% 0.00% 0.00% 0.00% 100.00%

Site
Capital Renewal Costs by Priority
TotalBuilding
Priority 1
$88,110

CAPITAL RENEWAL COSTS BY PRIORITY

ATTACHMENT A

APPENDIX A

A20
Silver Lake Campground
Facility Condition Assessment
Site
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.374
Condition Rating: CRITICALReplacement Cost/SF: $6
Capital Renewal Cost: $1,622,300
Replacement Cost: $4,337,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
G2020 PARKING LOTS $752,040 $789,640 - - - -
G2030 PEDESTRIAN PLAZAS AND

WALKWAYS
$82,205 $86,310 - - - -
G2050 ATHLETIC,

RECREATIONAL, AND

PLAYFIELD AREAS
$9,619 $10,100 - - - -
G2060 SITE DEVELOPMENT $250,279 $262,800 - - - -
G3020 SANITARY SEWERAGE

UTILITIES
$489,822 $514,310 - - - -
G4010 SITE ELECTRIC

DISTRIBUTION SYSTEMS
$1,202 $1,260 - - - -
G4050 SITE LIGHTING $37,132 $39,000 - - - -
$1,622,300 $1,703,420 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$1,622,300
$1,703,420

ATTACHMENT A

APPENDIX A

A21
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Site
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
G2020 - PARKING
LOTS
G2020.10.002 AC paving shows
evidence of potholing.

Replace AC pavement
section.
27,000 SF 1$268,960 $789,640251
G2030 -

PEDESTRIAN

PLAZAS AND

WALKWAYS
G2030.10.00 Concrete pavement has
major damage and
structural failure.

Repair and replace
concrete and base to
match existing.
200 SF 1$2,470 $7,250252
G2030 -

PEDESTRIAN

PLAZAS AND

WALKWAYS
G2030.30.038 Stairs are heavily
damaged and/or at the
end of their useful life.

Replace entire concrete
stair system, including
steps, handrails, and
landings.
80 LFN
S
1$17,590 $51,640255
G2030 -

PEDESTRIAN

PLAZAS AND

WALKWAYS
G2030.40.009 Handrails are damaged. Replace section of
handrail.
80 LF 1$9,340 $27,420257
G2050 - ATHLETIC,

RECREATIONAL,

AND PLAYFIELD
AREAS
G2050.10.212 The basketball hoop,
backboard and pole is
damaged and/or past its
expected useful life.

Replace basketball
hoop, backboard and
pole.
1 EA 1$3,440 $10,100246
G2060 - SITE

DEVELOPMENT
G2060.20.015 Vehicular swing gate
has major damage or
missing portions.

Replace single vehicular
swing gate (up to 12 ft
wide, 10 ft high).
1 EA 1$3,300 $9,690245
G2060 - SITE

DEVELOPMENT
G2060.20.021 Wood slat fencing (up to
6 ft high) shows heavy
damage and requires
full replacement.

Replace entire fence,
including rails and posts.
600 SF 1$7,010 $20,580247
G2060 - SITE

DEVELOPMENT
G2060.20.046 Metal wire mesh fence
is approaching the end
of its expected useful
life (up to 5'H).

Replace metal wire
mesh fence.
540 LF 1$24,480 $71,870241
G2060 - SITE

DEVELOPMENT
G2060.25.042 Barbeque equipment is
damaged or missing.

Replace concrete
barbeque.
1 EA 1$2,060 $6,050268
G2060 - SITE

DEVELOPMENT
G2060.30.016 Sign shows major
damage.

Replace wood sign. 1 EA 1$1,140 $3,350250
G2060 - SITE

DEVELOPMENT
G2060.70.030 Wood bridge overall is
severely damaged
Replace wood bridge. 150 SF 1$51,520 $151,260270
G3020 - SANITARY

SEWERAGE

UTILITIES
G3020.40.008 Leach fields need to be
replaced.

Provide equipment
replacement and
installation.
17,000 SF 1$175,180 $514,310240
G4010 - SITE

ELECTRIC

DISTRIBUTION

SYSTEMS
G4010.10.001 The wiring device (outlet
box, junction box,
receptacle, etc.) needs
to be replaced.

Supply and install a new
junction box and cover.
1 EA 1$130 $38016
G4010 - SITE

ELECTRIC

DISTRIBUTION

SYSTEMS
G4010.10.001 The wiring device (outlet
box, junction box,
receptacle, etc.) needs
to be replaced.

Supply and install a new
junction box and cover.
1 EA 1$130 $380293
G4010 - SITE

ELECTRIC

DISTRIBUTION

SYSTEMS
G4010.10.001 The wiring device (outlet
box, junction box,
receptacle, etc.) needs
to be replaced.

Supply and install a new
junction box and cover.
1 EA 1$130 $380301
G4010 - SITE

ELECTRIC

DISTRIBUTION

SYSTEMS
G4010.20.007 Buried PVC electrical
conduit is damaged (1"
DIA).

Replace the electrical
conduit.
2 LF 1$40 $120277
G4050 - SITE

LIGHTING
G4050.10.006 Site lighting is not
functioning or is
damaged.

Replace lighting (LED). 1 EA 1$2,520 $7,400278
G4050 - SITE

LIGHTING
G4050.10.006 Site lighting is not
functioning or is
damaged.

Replace lighting (LED). 1 EA 1$2,520 $7,400223

ATTACHMENT A

APPENDIX A

A22
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Site
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
G4050 - SITE

LIGHTING
G4050.10.006 Site lighting is not
functioning or is
damaged.

Replace lighting (LED). 1 EA 1$2,520 $7,400297
G4050 - SITE

LIGHTING
G4050.10.015 Site lighting pole is
approaching the end of
its useful life.

Replace steel pole and
lighting (up to 20 ft high).
1 EA 1$2,860 $8,400249
G4050 - SITE

LIGHTING
G4050.10.015 Site lighting pole is
approaching the end of
its useful life.

Replace steel pole and
lighting (up to 20 ft high).
1 EA 1$2,860 $8,400280

ATTACHMENT A

APPENDIX A

A23
Silver Lake Campground
Facility Condition Assessment
Site
PHOTO
NOT

APPLICABLE
Deficiency Description: The wiring device (outlet box, junction box, receptacle, etc.) needs to be replaced.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Supply and install a new junction box and cover.

Item No.: G4010.10.001
Comments:

System: G4010 - SITE ELECTRIC DISTRIBUTION

SYSTEMS
Total Deficiency Cost: $380
Record ID: 16
PHOTO
NOT

APPLICABLE
Deficiency Description: Site lighting is not functioning or is damaged.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace lighting (LED).

Item No.: G4050.10.006
Comments: Near Cabin U1
System: G4050 - SITE LIGHTING
Total Deficiency Cost: $7,400
Record ID: 223
PHOTO
NOT

APPLICABLE
Deficiency Description: Leach fields need to be replaced.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 17,000/SF
Description of Work: Provide equipment replacement and
installation.

Item No.: G3020.40.008
Comments:

System: G3020 - SANITARY SEWERAGE UTILITIES
Total Deficiency Cost: $514,310
Record ID: 240

ATTACHMENT A

APPENDIX A

A24
Silver Lake Campground
Facility Condition Assessment
Site
PHOTO
NOT

APPLICABLE
Deficiency Description: Metal wire mesh fence is approaching the end of its expected useful life (up to 5'H).

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 540/LF
Description of Work: Replace metal wire mesh fence.

Item No.: G2060.20.046
Comments:

System: G2060 - SITE DEVELOPMENT
Total Deficiency Cost: $71,870
Record ID: 241
PHOTO
NOT

APPLICABLE
Deficiency Description: Vehicular swing gate has major damage or missing portions.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace single vehicular swing gate (up to 12 ft wide, 10 ft high).

Item No.: G2060.20.015
Comments:

System: G2060 - SITE DEVELOPMENT
Total Deficiency Cost: $9,690
Record ID: 245
PHOTO
NOT

APPLICABLE
Deficiency Description: The basketball hoop, backboard and pole is damaged and/or past its expected useful
life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace basketball hoop, backboard and pole.

Item No.: G2050.10.212
Comments:

System: G2050 - ATHLETIC, RECREATIONAL, AND

PLAYFIELD AREAS
Total Deficiency Cost: $10,100
Record ID: 246

ATTACHMENT A

APPENDIX A

A25
Silver Lake Campground
Facility Condition Assessment
Site
PHOTO
NOT

APPLICABLE
Deficiency Description: Wood slat fencing (up to 6 ft high) shows heavy damage and requires full
replacement.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 600/SF
Description of Work: Replace entire fence, including rails and posts.

Item No.: G2060.20.021
Comments:

System: G2060 - SITE DEVELOPMENT
Total Deficiency Cost: $20,580
Record ID: 247
PHOTO
NOT

APPLICABLE
Deficiency Description: Site lighting pole is approaching the end of its useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace steel pole and lighting (up to 20 ft high).

Item No.: G4050.10.015
Comments:

System: G4050 - SITE LIGHTING
Total Deficiency Cost: $8,400
Record ID: 249
PHOTO
NOT

APPLICABLE
Deficiency Description: Sign shows major damage.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace wood sign.

Item No.: G2060.30.016
Comments:

System: G2060 - SITE DEVELOPMENT
Total Deficiency Cost: $3,350
Record ID: 250

ATTACHMENT A

APPENDIX A

A26
Silver Lake Campground
Facility Condition Assessment
Site
PHOTO
NOT

APPLICABLE
Deficiency Description: AC paving shows evidence of potholing.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 27,000/SF
Description of Work: Replace AC pavement section.

Item No.: G2020.10.002
Comments:

System: G2020 - PARKING LOTS
Total Deficiency Cost: $789,640
Record ID: 251
PHOTO
NOT

APPLICABLE
Deficiency Description: Concrete pavement has major damage and structural failure.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 200/SF
Description of Work: Repair and replace concrete and base to match existing.

Item No.: G2030.10.00
Comments:

System: G2030 - PEDESTRIAN PLAZAS AND

WALKWAYS
Total Deficiency Cost: $7,250
Record ID: 252
PHOTO
NOT

APPLICABLE
Deficiency Description: Stairs are heavily damaged and/or at the end of their useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 80/LFNS
Description of Work: Replace entire concrete stair system, including steps, handrails, and landings.

Item No.: G2030.30.038
Comments:

System: G2030 - PEDESTRIAN PLAZAS AND

WALKWAYS
Total Deficiency Cost: $51,640
Record ID: 255

ATTACHMENT A

APPENDIX A

A27
Silver Lake Campground
Facility Condition Assessment
Site
PHOTO
NOT

APPLICABLE
Deficiency Description: Handrails are damaged.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 80/LF
Description of Work: Replace section of handrail.

Item No.: G2030.40.009
Comments:

System: G2030 - PEDESTRIAN PLAZAS AND

WALKWAYS
Total Deficiency Cost: $27,420
Record ID: 257
PHOTO
NOT

APPLICABLE
Deficiency Description: Barbeque equipment is damaged or missing.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace concrete barbeque.

Item No.: G2060.25.042
Comments:

System: G2060 - SITE DEVELOPMENT
Total Deficiency Cost: $6,050
Record ID: 268
PHOTO
NOT

APPLICABLE
Deficiency Description: Wood bridge overall is severely damaged Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 150/SF
Description of Work: Replace wood bridge.

Item No.: G2060.70.030
Comments:

System: G2060 - SITE DEVELOPMENT
Total Deficiency Cost: $151,260
Record ID: 270

ATTACHMENT A

APPENDIX A

A28
Silver Lake Campground
Facility Condition Assessment
Site
PHOTO
NOT

APPLICABLE
Deficiency Description: Buried PVC electrical conduit is damaged (1" DIA).

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 2/LF
Description of Work: Replace the electrical conduit.

Item No.: G4010.20.007
Comments:

System: G4010 - SITE ELECTRIC DISTRIBUTION

SYSTEMS
Total Deficiency Cost: $120
Record ID: 277
PHOTO
NOT

APPLICABLE
Deficiency Description: Site lighting is not functioning or is damaged.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace lighting (LED).

Item No.: G4050.10.006
Comments:

System: G4050 - SITE LIGHTING
Total Deficiency Cost: $7,400
Record ID: 278
PHOTO
NOT

APPLICABLE
Deficiency Description: Site lighting pole is approaching the end of its useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace steel pole and lighting (up to 20 ft high).

Item No.: G4050.10.015
Comments:

System: G4050 - SITE LIGHTING
Total Deficiency Cost: $8,400
Record ID: 280

ATTACHMENT A

APPENDIX A

A29
Silver Lake Campground
Facility Condition Assessment
Site
PHOTO
NOT

APPLICABLE
Deficiency Description: The wiring device (outlet box, junction box, receptacle, etc.) needs to be replaced.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Supply and install a new junction box and cover.

Item No.: G4010.10.001
Comments:

System: G4010 - SITE ELECTRIC DISTRIBUTION

SYSTEMS
Total Deficiency Cost: $380
Record ID: 293
PHOTO
NOT

APPLICABLE
Deficiency Description: Site lighting is not functioning or is damaged.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace lighting (LED).

Item No.: G4050.10.006
Comments:

System: G4050 - SITE LIGHTING
Total Deficiency Cost: $7,400
Record ID: 297
PHOTO
NOT

APPLICABLE
Deficiency Description: The wiring device (outlet box, junction box, receptacle, etc.) needs to be replaced.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Supply and install a new junction box and cover.

Item No.: G4010.10.001
Comments:

System: G4010 - SITE ELECTRIC DISTRIBUTION

SYSTEMS
Total Deficiency Cost: $380
Record ID: 301

ATTACHMENT A

APPENDIX A

A30
DETAILED REPORT | CABIN C1-C2-C3
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page B1 Y ear Built (approximate): Unknown
Total Building Area: 600 SF
Statistics
Address: 29981 Plasse Road, Pioneer, CA 95666
Cabin C1-C2-C3
Detailed Report
FCA Summary
Capital Renewal Cost: $78,626
FCI: 0.217
Condition Score: C
Condition Rating: Poor
Replacement Cost: $362,000
Replacement Cost/SF: $603

ATTACHMENT A

APPENDIX A

A31
Page B2
DETAILED REPORT | CABIN C1-C2-C3
CITY OF STOCKTON | FINAL REPORT
Architectural Systems
Cabin C1-C2-C3 is an approximately 600 square foot,
wood frame constructed structure on a concrete slab
foundation with a sloped metal roof. The exterior
painted wood board siding and windows are showing
signs of damage, age, and wear. The metal roof
appears to be in fair condition and within its expected useful life. The interior of the cabin includes three
rooms with unpainted plywood walls connected by
interior doors.

Mechanical Systems
Mechanical Systems
No mechanical systems were observed during the
assessment.

Plumbing Systems
No plumbing systems were observed during the
assessment.

Fire Protection Systems
No fire protection systems were observed during
the assessment; however, a fire extinguisher or wall
brackets for fire extinguishers were observed in the
cabin during the assessment.

Narratives
Electrical Systems
Electrical power is provided by an external wall load
center that is likely located on the Crafts Cabin. Each room has a single ceiling mounted light fixture, wall
outlet and an exterior wall mounted light fixture to
provide for site lighting. The electrical equipment
and lighting fixtures appear to be past their expected
useful life and/or damaged.

Fire Detection and Alarm Systems
Each room is equipped with a battery-operated ceiling
mounted smoke detector/alarm that appear to be
past their expected useful life and/or need battery
replacement and testing.

ATTACHMENT A

APPENDIX A

A32
DETAILED REPORT | CABIN C1-C2-C3
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page B3 Conclusion
For Cabin C1-C2-C3, these charts summarize the Capital Renewal Costs by Priority with their associated costs and escalation based on the time period anticipated for implementation. Detailed Capital Renewal Costs by Priority, broken down by Building System Class, are included in the following CIP Deficiency Cost Summaries.

This chart summarizes all of the more detailed information from the subsequent Deficiency Table. To supplement the Deficiency Table, representative photographs and descriptions are included.

Priority 1 Priorit y 2 Priorit y 3 Priorit y 4 Priorit y 5 8% Escalation 13% Escalation 18% Escalation 23% Escalation 28% Escalation Cabin C1-C2-C3 $78,626 $0 $0 $0 $0 $78,626
Total $78,626 $0 $0 $0 $0 $78,626
100.00% 0.00% 0.00% 0.00% 0.00% 100.00%

Cabin C1-C2-C3
Capital Renewal Costs by Priority
TotalBuilding
Priority 1
$78,626

CAPITAL RENEWAL COSTS BY PRIORITY

ATTACHMENT A

APPENDIX A

A33
Page B4
DETAILED REPORT | CABIN C1-C2-C3
CITY OF STOCKTON | FINAL REPORT
This page intentionally left blank.

ATTACHMENT A

APPENDIX A

A34
Silver Lake Campground
Facility Condition Assessment
Cabin C1-C2-C3
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: C
FCI: 0.217
Condition Rating: POORReplacement Cost/SF: $603
Capital Renewal Cost: $78,626
Replacement Cost: $362,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $28,800 $30,240 - - - -
B2020 EXTERIOR WINDOWS $37,216 $39,080 - - - -
D5040 LIGHTING $10,681 $11,220 - - - -
D7050 DETECTION AND ALARM $1,929 $2,030 - - - -
$78,626 $82,570 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$78,626
$82,570

ATTACHMENT A

APPENDIX A

A35
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin C1-C2-C3
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
1,200 SF 1$10,300 $30,240358
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 75 SF 1$13,310 $39,080359
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing wall
mounted lighting fixture
with an LED lighting
fixture.
3 EA 1$2,540 $7,460360
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
3 EA 1$1,280 $3,760361
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
3 EA 1$690 $2,030362

ATTACHMENT A

APPENDIX A

A36
Silver Lake Campground
Facility Condition Assessment
Cabin C1-C2-C3
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1,200/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $30,240
Record ID: 358
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 75/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $39,080
Record ID: 359
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 3/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $7,460
Record ID: 360

ATTACHMENT A

APPENDIX A

A37
Silver Lake Campground
Facility Condition Assessment
Cabin C1-C2-C3
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 3/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $3,760
Record ID: 361
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 3/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $2,030
Record ID: 362

ATTACHMENT A

APPENDIX A

A38
DETAILED REPORT | CABIN H1-H2-H3
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page C1 Y ear Built (approximate): Unknown
Total Building Area: 450 SF
Statistics
Address: 29981 Plasse Road, Pioneer, CA 95666
Cabin H1-H2-H3
Detailed Report
FCA Summary
Capital Renewal Cost: $130,522
FCI: 0.482
Condition Score: D
Condition Rating: Critical
Replacement Cost: $271,000
Replacement Cost/SF: $602

ATTACHMENT A

APPENDIX A

A39
Page C2
DETAILED REPORT | CABIN H1-H2-H3
CITY OF STOCKTON | FINAL REPORT
Architectural Systems
Cabin H1-H2-H3 is an approximately 450 square
foot wood frame constructed structure on a raised
foundation with a sloped metal roof. The exterior
painted wood board siding and windows are showing
signs of damage, age, and wear. The metal roof is
damaged, showing signs of age, wear and should be
repaired or replaced. The stone veneer of the concrete
block chimney appears to have been removed and
partially repaired exposing some unpainted siding.

The interior of the cabin includes three rooms with
unpainted plywood walls connected by interior doors
and wood board floor.

Mechanical Systems
Mechanical Systems
No mechanical systems were observed during the
assessment.

Plumbing Systems
No plumbing systems were observed during the
assessment.

Fire Protection Systems
No fire protection systems were observed during
the assessment; however, a fire extinguisher or wall
brackets for fire extinguishers were observed in the
cabin during the assessment.

Narratives
Electrical Systems
Electrical power is provided by an external wall load
center that appears to be past its expected useful life.

Each room has at least one single ceiling mounted
light fixture, wall outlet and an exterior wall mounted light fixture to provide for site lighting. The electrical equipment and lighting fixtures appear to be past their expected useful life and/or damaged.

Fire Detection and Alarm Systems
Each room is equipped with a battery-operated ceiling
mounted smoke detector/alarm that appear to be
past their expected useful life and/or need battery
replacement and testing.

ATTACHMENT A

APPENDIX A

A40
DETAILED REPORT | CABIN H1-H2-H3
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page C3 Conclusion
For Cabin H1-H2-H3, these charts summarize the Capital Renewal Costs by Priority with their associated costs and escalation based on the time period anticipated for implementation. Detailed Capital Renewal Costs by Priority, broken down by Building System Class, are included in the following CIP Deficiency Cost Summaries.

This chart summarizes all of the more detailed information from the subsequent Deficiency Table. To supplement the Deficiency Table, representative photographs and descriptions are included.

Priority 1 Priorit y 2 Priorit y 3 Priorit y 4 Priorit y 5 8% Escalation 13% Escalation 18% Escalation 23% Escalation 28% Escalation Cabin H1-H2-H3 $137,050 $0 $0 $0 $0 $137,050
Total $137,050 $0 $0 $0 $0 $137,050
100.00% 0.00% 0.00% 0.00% 0.00% 100.00%

Cabin H1-H2-H3
Capital Renewal Costs by Priority
TotalBuilding
Priority 1
$137,050

CAPITAL RENEWAL COSTS BY PRIORITY

ATTACHMENT A

APPENDIX A

A41
Page C4
DETAILED REPORT | CABIN H1-H2-H3
CITY OF STOCKTON | FINAL REPORT
This page intentionally left blank.

ATTACHMENT A

APPENDIX A

A42
Silver Lake Campground
Facility Condition Assessment
Cabin H1-H2-H3
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.482
Condition Rating: CRITICALReplacement Cost/SF: $602
Capital Renewal Cost: $130,522
Replacement Cost: $271,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $23,208 $24,360 - - - -
B2020 EXTERIOR WINDOWS $44,654 $46,890 - - - -
B2050 EXTERIOR DOORS AND

GRILLES
$24,019 $25,220 - - - -
B3010 ROOFING $18,398 $19,320 - - - -
D5020 ELECTRICAL SERVICE AND

DISTRIBUTION
$6,431 $6,750 - - - -
D5040 LIGHTING $11,883 $12,480 - - - -
D7050 DETECTION AND ALARM $1,929 $2,030 - - - -
$130,522 $137,050 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$130,522
$137,050

ATTACHMENT A

APPENDIX A

A43
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin H1-H2-H3
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.008 Stone veneer is missing
or damaged.

Repair or replace
damaged stone veneer.
100 SF 1$570 $1,670161
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
900 SF 1$7,730 $22,690160
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 90 SF 1$15,970 $46,890570
B2050 - EXTERIOR

DOORS AND

GRILLES
B2050.10.001 Exterior wood entrance
door is approaching the
end of its useful life.

Replace wood door. 3 EA 1$8,590 $25,220164
B3010 - ROOFING B3010.10.002 Metal Roofing is at or
approaching end of
expected useful service
life.

Remove and replace
metal roofing.
500 SF 1$6,580 $19,320163
D5020 -

ELECTRICAL

SERVICE AND

DISTRIBUTION
D5020.30.9114 The outdoor load center
is past its expected
useful life.

Replace the existing
load center with a new
load center.
1 EA 1$2,300 $6,750165
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
3 EA 1$2,540 $7,460159
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
4 EA 1$1,710 $5,020571
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
3 EA 1$690 $2,030572

ATTACHMENT A

APPENDIX A

A44
Silver Lake Campground
Facility Condition Assessment
Cabin H1-H2-H3
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 3/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $7,460
Record ID: 159
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 900/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $22,690
Record ID: 160
PHOTO
NOT

APPLICABLE
Deficiency Description: Stone veneer is missing or damaged.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 100/SF
Description of Work: Repair or replace damaged stone veneer.

Item No.: B2010.10.008
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $1,670
Record ID: 161

ATTACHMENT A

APPENDIX A

A45
Silver Lake Campground
Facility Condition Assessment
Cabin H1-H2-H3
PHOTO
NOT

APPLICABLE
Deficiency Description: Metal Roofing is at or approaching end of expected useful service life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 500/SF
Description of Work: Remove and replace metal roofing.

Item No.: B3010.10.002
Comments:

System: B3010 - ROOFING
Total Deficiency Cost: $19,320
Record ID: 163
PHOTO
NOT

APPLICABLE
Deficiency Description: Exterior wood entrance door is
approaching the end of its useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 3/EA
Description of Work: Replace wood door.

Item No.: B2050.10.001
Comments:

System: B2050 - EXTERIOR DOORS AND GRILLES
Total Deficiency Cost: $25,220
Record ID: 164
PHOTO
NOT

APPLICABLE
Deficiency Description: The outdoor load center is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing load center with a new load center.

Item No.: D5020.30.9114
Comments:

System: D5020 - ELECTRICAL SERVICE AND

DISTRIBUTION
Total Deficiency Cost: $6,750
Record ID: 165

ATTACHMENT A

APPENDIX A

A46
Silver Lake Campground
Facility Condition Assessment
Cabin H1-H2-H3
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 90/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $46,890
Record ID: 570
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 4/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $5,020
Record ID: 571
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 3/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $2,030
Record ID: 572

ATTACHMENT A

APPENDIX A

A47
DETAILED REPORT | CABIN L1-L2-L3
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page D1 Y ear Built (approximate): Unknown
Total Building Area: 450 SF
Statistics
Address: 29981 Plasse Road, Pioneer, CA 95666
Cabin L1-L2-L3
Detailed Report
FCA Summary
Capital Renewal Cost: $109,663
FCI: 0.405
Condition Score: D
Condition Rating: Critical
Replacement Cost: $271,000
Replacement Cost/SF: $602

ATTACHMENT A

APPENDIX A

A48
Page D2
DETAILED REPORT | CABIN L1-L2-L3
CITY OF STOCKTON | FINAL REPORT
Architectural Systems
Cabin L1-L2-L3 is an approximately 450 square foot
wood frame constructed structure on a concrete slab
foundation with a sloped metal roof. The exterior
painted wood board siding and windows are showing
signs of damage, age, and wear. The metal roof
appears to be in fair condition and within its expected useful life. The interior of the cabin includes three
rooms with unpainted plywood walls connected by
interior doors and concrete floor.

Mechanical Systems
Mechanical Systems
No mechanical systems were observed during the
assessment.

Plumbing Systems
No plumbing systems were observed during the
assessment.

Fire Protection Systems
No fire protection systems were observed during
the assessment; however, a fire extinguisher or wall
brackets for fire extinguishers were observed in the
cabin during the assessment.

Narratives
Electrical Systems
Electrical power is provided by an external wall load
center that is likely located on the Manager’s Cabin.

Each room has at least one single ceiling mounted
light fixture, wall outlet and an exterior wall mounted light fixture to provide for site lighting. The electrical equipment and lighting fixtures appear to be past their expected useful life and/or damaged.

Fire Detection and Alarm Systems
Each room is equipped with a battery-operated ceiling
mounted smoke detector/alarm that appear to be
past their expected useful life and/or need battery
replacement and testing.

ATTACHMENT A

APPENDIX A

A49
DETAILED REPORT | CABIN L1-L2-L3
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page D3 Conclusion
For Cabin L1-L2-L3, these charts summarize the Capital Renewal Costs by Priority with their associated costs and escalation based on the time period anticipated for implementation. Detailed Capital Renewal Costs by Priority, broken down by Building System Class, are included in the following CIP Deficiency Cost Summaries. This chart summarizes all of the more detailed information from the subsequent Deficiency Table. To supplement the Deficiency Table, representative photographs and descriptions are included.

Priority 1 Priorit y 2 Priorit y 3 Priorit y 4 Priorit y 5 8% Escalation 13% Escalation 18% Escalation 23% Escalation 28% Escalation Cabin L1-L2-L3 $115,160 $0 $0 $0 $0 $115,160
Total $115,160 $0 $0 $0 $0 $115,160
100.00% 0.00% 0.00% 0.00% 0.00% 100.00%

Cabin L1-L2-L3
Capital Renewal Costs by Priority
TotalBuilding
Priority 1
$115,160

CAPITAL RENEWAL COSTS BY PRIORITY

ATTACHMENT A

APPENDIX A

A50
Page D4
DETAILED REPORT | CABIN L1-L2-L3
CITY OF STOCKTON | FINAL REPORT
This page intentionally left blank.

ATTACHMENT A

APPENDIX A

A51
Silver Lake Campground
Facility Condition Assessment
Cabin L1-L2-L3
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.405
Condition Rating: CRITICALReplacement Cost/SF: $602
Capital Renewal Cost: $109,663
Replacement Cost: $271,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $38,418 $40,340 - - - -
B2020 EXTERIOR WINDOWS $37,216 $39,080 - - - -
B2050 EXTERIOR DOORS AND

GRILLES
$21,055 $22,110 - - - -
D5040 LIGHTING $10,681 $11,220 - - - -
D7050 DETECTION AND ALARM $1,929 $2,030 - - - -
G4010 SITE ELECTRIC

DISTRIBUTION SYSTEMS
$363 $380 - - - -
$109,663 $115,160 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$109,663
$115,160

ATTACHMENT A

APPENDIX A

A52
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin L1-L2-L3
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
1,600 SF 1$13,740 $40,340574
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 75 SF 1$13,310 $39,080573
B2050 - EXTERIOR

DOORS AND

GRILLES
B2050.10.006 Exterior aluminum
entrance door, frame
and hardware is
approaching the end of
its useful life.

Replace aluminum door,
frame, and hardware.
3 EA 1$7,530 $22,110167
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing wall
mounted lighting fixture
with an LED lighting
fixture.
3 EA 1$2,540 $7,460169
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
3 EA 1$1,280 $3,760575
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
3 EA 1$690 $2,030576
G4010 - SITE

ELECTRIC

DISTRIBUTION

SYSTEMS
G4010.10.001 The wiring device (outlet
box, junction box,
receptacle, etc.) needs
to be replaced.

Supply and install a new
junction box and cover.
1 EA 1$130 $380168

ATTACHMENT A

APPENDIX A

A53
Silver Lake Campground
Facility Condition Assessment
Cabin L1-L2-L3
PHOTO
NOT

APPLICABLE
Deficiency Description: Exterior aluminum entrance door, frame and hardware is approaching the end of its
useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 3/EA
Description of Work: Replace aluminum door, frame, and
hardware.

Item No.: B2050.10.006
Comments:

System: B2050 - EXTERIOR DOORS AND GRILLES
Total Deficiency Cost: $22,110
Record ID: 167
PHOTO
NOT

APPLICABLE
Deficiency Description: The wiring device (outlet box, junction box, receptacle, etc.) needs to be replaced.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Supply and install a new junction box and cover.

Item No.: G4010.10.001
Comments:

System: G4010 - SITE ELECTRIC DISTRIBUTION

SYSTEMS
Total Deficiency Cost: $380
Record ID: 168
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 3/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $7,460
Record ID: 169

ATTACHMENT A

APPENDIX A

A54
Silver Lake Campground
Facility Condition Assessment
Cabin L1-L2-L3
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 75/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $39,080
Record ID: 573
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1,600/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $40,340
Record ID: 574
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 3/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $3,760
Record ID: 575

ATTACHMENT A

APPENDIX A

A55
Silver Lake Campground
Facility Condition Assessment
Cabin L1-L2-L3
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 3/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $2,030
Record ID: 576

ATTACHMENT A

APPENDIX A

A56
DETAILED REPORT | CABINS
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page E1 Y ear Built (approximate): Unknown
Total Building Area: 250 SF
Statistics
Address: 29981 Plasse Road, Pioneer, CA 95666
Cabins
Detailed Report
FCA Summary
Capital Renewal Cost: $2,311,512
FCI: Refer to table on next page
Condition Score: C to D
Condition Rating: Poor to Critical
Replacement Cost: $5,152,000
Replacement Cost/SF: $747

ATTACHMENT A

APPENDIX A

A57
Page E2
CITY OF STOCKTON | FINAL REPORT
Priority 1
5% Escalation
Priority 2
10% Escalation
Priority 3
15% Escalation
Priority 4
20% Escalation
Priority 5
25% Escalation
Cabin A $ 65,820 $ 69,110 $ - $ - $ - $ - $ 69,110 $112,000.00 0.59 D CRITICAL Cabin B1 $ 65,009 $ 68,260 $ - $ - $ - $ - $ 68,260 $112,000.00 0.58 D CRITICAL Cabin B2 $ 52,036 $ 54,640 $ - $ - $ - $ - $ 54,640 $112,000.00 0.46 D CRITICAL Cabin D $ 56,202 $ 59,010 $ - $ - $ - $ - $ 59,010 $112,000.00 0.50 D CRITICAL Cabin E1 $ 59,753 $ 62,740 $ - $ - $ - $ - $ 62,740 $112,000.00 0.53 D CRITICAL Cabin E2 $ 47,562 $ 49,940 $ - $ - $ - $ - $ 49,940 $112,000.00 0.42 D CRITICAL Cabin F $ 49,659 $ 52,140 $ - $ - $ - $ - $ 52,140 $112,000.00 0.44 D CRITICAL Cabin G1 $ 57,823 $ 60,710 $ - $ - $ - $ - $ 60,710 $112,000.00 0.52 D CRITICAL Cabin G2 $ 52,623 $ 55,250 $ - $ - $ - $ - $ 55,250 $112,000.00 0.47 D CRITICAL Cabin G3 $ 44,542 $ 46,770 $ - $ - $ - $ - $ 46,770 $112,000.00 0.40 D CRITICAL Cabin G4 $ 43,927 $ 46,120 $ - $ - $ - $ - $ 46,120 $112,000.00 0.39 D CRITICAL Cabin I $ 60,620 $ 63,650 $ - $ - $ - $ - $ 63,650 $112,000.00 0.54 D CRITICAL Cabin J $ 52,287 $ 54,900 $ - $ - $ - $ - $ 54,900 $112,000.00 0.47 D CRITICAL Cabin K $ 52,623 $ 55,250 $ - $ - $ - $ - $ 55,250 $112,000.00 0.47 D CRITICAL Cabin M $ 59,389 $ 62,360 $ - $ - $ - $ - $ 62,360 $112,000.00 0.53 D CRITICAL Cabin M2 $ 41,522 $ 43,600 $ - $ - $ - $ - $ 43,600 $112,000.00 0.37 D CRITICAL Cabin N $ 51,392 $ 53,960 $ - $ - $ - $ - $ 53,960 $112,000.00 0.46 D CRITICAL Cabin O $ 50,861 $ 53,400 $ - $ - $ - $ - $ 53,400 $112,000.00 0.45 D CRITICAL Cabin P $ 51,392 $ 53,960 $ - $ - $ - $ - $ 53,960 $112,000.00 0.46 D CRITICAL Cabin Q1 $ 54,636 $ 57,360 $ - $ - $ - $ - $ 57,360 $112,000.00 0.49 D CRITICAL Cabin Q2 $ 44,039 $ 46,240 $ - $ - $ - $ - $ 46,240 $112,000.00 0.39 D CRITICAL Cabin R1 $ 51,392 $ 53,960 $ - $ - $ - $ - $ 53,960 $112,000.00 0.46 D CRITICAL Cabin R2 $ 49,016 $ 51,460 $ - $ - $ - $ - $ 51,460 $112,000.00 0.44 D CRITICAL Cabin S1 $ 60,452 $ 63,470 $ - $ - $ - $ - $ 63,470 $112,000.00 0.54 D CRITICAL Cabin S2 $ 49,016 $ 51,460 $ - $ - $ - $ - $ 51,460 $112,000.00 0.44 D CRITICAL Cabin S3 $ 44,039 $ 46,240 $ - $ - $ - $ - $ 46,240 $112,000.00 0.39 D CRITICAL Cabin S4 $ 21,698 $ 22,780 $ - $ - $ - $ - $ 22,780 $112,000.00 0.19 C POOR Cabin T1 $ 58,355 $ 61,260 $ - $ - $ - $ - $ 61,260 $112,000.00 0.52 D CRITICAL Cabin T2 $ 59,389 $ 62,360 $ - $ - $ - $ - $ 62,360 $112,000.00 0.53 D CRITICAL Cabin T3 $ 42,920 $ 45,060 $ - $ - $ - $ - $ 45,060 $112,000.00 0.38 D CRITICAL Cabin T4 $ 42,836 $ 44,980 $ - $ - $ - $ - $ 44,980 $112,000.00 0.38 D CRITICAL Cabin T5 $ 44,123 $ 46,320 $ - $ - $ - $ - $ 46,320 $112,000.00 0.39 D CRITICAL Cabin T6 $ 49,659 $ 52,140 $ - $ - $ - $ - $ 52,140 $112,000.00 0.44 D CRITICAL Cabin U1 $ 57,823 $ 60,710 $ - $ - $ - $ - $ 60,710 $112,000.00 0.52 D CRITICAL Cabin U2 $ 51,392 $ 53,960 $ - $ - $ - $ - $ 53,960 $112,000.00 0.46 D CRITICAL Cabin U3 $ 51,392 $ 53,960 $ - $ - $ - $ - $ 53,960 $112,000.00 0.46 D CRITICAL Cabin V1 $ 43,927 $ 46,120 $ - $ - $ - $ - $ 46,120 $112,000.00 0.39 D CRITICAL Cabin V2 $ 43,927 $ 46,120 $ - $ - $ - $ - $ 46,120 $112,000.00 0.39 D CRITICAL Cabin V3 $ 45,800 $ 48,090 $ - $ - $ - $ - $ 48,090 $112,000.00 0.41 D CRITICAL Cabin W1 $ 44,542 $ 46,770 $ - $ - $ - $ - $ 46,770 $112,000.00 0.40 D CRITICAL Cabin W2 $ 43,927 $ 46,120 $ - $ - $ - $ - $ 46,120 $112,000.00 0.39 D CRITICAL Cabin W3 $ 43,927 $ 46,120 $ - $ - $ - $ - $ 46,120 $112,000.00 0.39 D CRITICAL Cabin X $ 65,792 $ 69,070 $ - $ - $ - $ - $ 69,070 $112,000.00 0.59 D CRITICAL Cabin Y1 $ 51,896 $ 54,480 $ - $ - $ - $ - $ 54,480 $112,000.00 0.46 D CRITICAL Cabin Y2 $ 29,135 $ 30,590 $ - $ - $ - $ - $ 30,590 $112,000.00 0.26 C POOR Cabin Z $ 51,420 $ 53,990 $ - $ - $ - $ - $ 53,990 $112,000.00 0.46 D CRITICAL Cook Shack (Ray)
$2,311,512 $2,426,960 $0 $0 $0 $0 $2,426,960 $5,152,000 Cabins
Condition
Score
Condition
Rating
Capital Renewal Costs by Priority
Location Current Capital
Renewal Cost
Total Capital
Renewal Cost
(Escalated)
Replacement
Costs FCI
6/27/2024 Page 1

ATTACHMENT A

APPENDIX A

A58
DETAILED REPORT | CABINS
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page E3 For the cabins, this chart summarizes the Capital Renewal Costs by Priority with their associated costs and escalation based on the time period anticipated for implementation.

Detailed Capital Renewal Costs by Priority, broken down by Building System Class, are included in the following CIP Deficiency Cost Summary. This chart summarizes all of the more detailed information from the subsequent Deficiency Table. To supplement the Deficiency Table, representative photographs and descriptions are included. Buildings with a zero cost noted in each Priority will not have a Deficiency Table attached, as there were no deficiencies noted in this assessment.

Priority 1
$2,468,530

CAPITAL RENEWAL COSTS BY PRIORITY

ATTACHMENT A

APPENDIX A

A59
DETAILED REPORT | CABINS
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page E4 Architectural Systems
There are a total of 45 cabins located throughout
the site that are intended to be used by three to four
campers each. The cabins are approximately 10 feet
by 15 feet wood frame construction with most on a
concrete slab foundation. Most of the cabins have
a wood shake roof that are well past their expected
useful lives and in need of replacement. The wood
siding needs minor repair and painting. Most cabins
include concrete floors and painted plywood walls and
ceilings.

Mechanical Systems
Mechanical Systems
No mechanical systems were observed during the
assessment.

Plumbing Systems
No plumbing systems were observed during the
assessment.

Fire Protection Systems
No fire protection systems were observed during the
assessment; however, several cabins include a fire
extinguisher (or a place for a fire extinguisher) and/or a map indicating which cabins are equipped.

Narratives
Electrical Systems
Electrical power is provided by an external wall load
center on various cabins throughout the site. Each
cabin has a single ceiling mounted light fixture and
wall outlet. Most cabins have an exterior wall mounted
light fixture to provide for site lighting. The electrical equipment and lighting fixtures appear to be past their expected useful life and/or are damaged.

Fire Detection and Alarm Systems
No fire protection systems were observed during the
assessment; however, several cabins include a fire
extinguisher (or a place for a fire extinguisher) and/or a map indicating which cabins are equipped.

ATTACHMENT A

APPENDIX A

A60
Page E5
DETAILED REPORT | CABINS
CITY OF STOCKTON | FINAL REPORT
Additional Condition Notes by Cabin
Cabin A
• Panel board A appears to be past its expected useful life and in need of replacement.

Cabin B1
• T he concrete foundation is severely cracked due to settlement and/or uplift and should be replaced.

Cabin B2
•
T
he concrete foundation is cracking due to settlement and/or uplift but is still functional. •
W
indows do not close and are boarded up.
•
I
nterior walls have been damaged due to settlement.

Cabin D
• T he team was unable to access the cabin’s interior during the assessment due to snow and lock. •
T
he wood deck is showing signs of age, wear, and damage.

Cabin E1
•
T
he concrete foundation is cracking due to settlement which does not allow the entrance door to fully open. •
E
xterior electrical pull box is damaged exposing wires.

Cabin F
• T he concrete foundation is cracking due to settlement which does not allow the entrance door to fully open.

Cabin G1
• T he wood shake roof is damaged and should be repaired and/or replaced. •
Panel
board G2 appears past its expected useful life and in need of replacement.

Cabin G2
•
T
he concrete foundation is cracking due to settlement but is still functional. •
T
he concrete entrance step is showing signs of wear and is being undermined by site drainage.

Cabin G3
• T he team was unable to access the interior of the cabin during the assessment. •
T
he metal roof is showings signs of age, wear and appears past its expected useful life.

Cabin G4
• T he team was unable to access the cabin’s interior during the assessment due to snow and lock. •
T
he metal roof is damaged and showing signs of age, wear and is need of repair/replacement.

ATTACHMENT A

APPENDIX A

A61
DETAILED REPORT | CABINS
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page E6 Cabin J
•
T
he exterior electrical conduit and pull box are damaged and in need of repair/replacement.

Cabin M
• T he team was unable to access the interior of the cabin during the assessment.

Cabin N
• T he team was unable to access the interior of the cabin during the assessment.

Cabin O
•
T
he wood shake is damaged and past its expected useful life.

Cabin P
• A ppears to be the designated accessible cabin.

Cabin Q1
•
C
oncrete foundation is severely cracked due to settlement and/or uplift and should be replaced.

Cabin S1
• Panel board S1 appears to be past its expected useful life and in need of replacement.

Cabin T1
•
T
he team was unable to access the interior of the cabin during the assessment. •
Panel
board T1 appears to be past its expected useful life and in need of replacement.

Cabin T2
• T he team was unable to access the interior of the cabin during the assessment. •
T
he wood shake roof is showing signs of wear, damage and should be replaced.

Cabin T6
• T he team was unable to access the interior of the cabin during the assessment.

Cabin U1
•
T
he team was unable to access the interior of the cabin during the assessment. •
Panel U
1 appears to be past its expected useful life and in need of replacement.

Cabin U3
• T he team was unable to access the interior of the cabin during the assessment. •
T
he metal roof shows damage from falling tree limbs and debris and should be repaired/replaced.

Cabin V1
• T he metal roof is showing signs of severe damage, wear and should be replaced.

ATTACHMENT A

APPENDIX A

A62
Page E7
DETAILED REPORT | CABINS
CITY OF STOCKTON | FINAL REPORT
Cabin X
• T he concrete foundation is severely cracked due to settlement and/or uplift and should be replaced.

Cabin Y2
• T he concrete foundation is severely cracked due to settlement caused by erosion along the slab.

ATTACHMENT A

APPENDIX A

A63
DETAILED REPORT | CABINS
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page E8 This page intentionally left blank.

ATTACHMENT A

APPENDIX A

A64
Silver Lake Campground
Facility Condition Assessment
Cabin A
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.582
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $65,149
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $22,341 $23,460 - - - -
B2050 EXTERIOR DOORS AND

GRILLES
$7,997 $8,400 - - - -
B3010 ROOFING $7,354 $7,720 - - - -
D5020 ELECTRICAL SERVICE AND

DISTRIBUTION
$6,431 $6,750 - - - -
D5040 LIGHTING $3,579 $3,760 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
$65,149 $68,410 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$65,149
$68,410

ATTACHMENT A

APPENDIX A

A65
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin A
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding and/or wall finish
is showing signs of age
and wear.

Power wash and repaint
existing wood board
siding and/or wall finish.
700 SF 1$6,010 $17,640336
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 45 SF 1$7,990 $23,460338
B2050 - EXTERIOR

DOORS AND

GRILLES
B2050.10.001 Exterior wood entrance
door is damaged and/or
past its expected useful
life.

Replace wood door. 1 EA 1$2,860 $8,400599
B3010 - ROOFING B3010.10.007 Wood shake roof is past
its expected useful life.

Remove and replace
wood shake roof and
replace with metal
roofing.
200 SF 1$2,630 $7,720339
D5020 -

ELECTRICAL

SERVICE AND

DISTRIBUTION
D5020.30.9114 The outdoor load center
is past its expected
useful life.

Replace the existing
load center with a new
load center.
1 EA 1$2,300 $6,750292
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
1 EA 1$850 $2,500348
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing fixtures
with LED fixtures.
1 EA 1$430 $1,260349
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $680350

ATTACHMENT A

APPENDIX A

A66
Silver Lake Campground
Facility Condition Assessment
Cabin A
PHOTO
NOT

APPLICABLE
Deficiency Description: The outdoor load center is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing load center with a new load center.

Item No.: D5020.30.9114
Comments:

System: D5020 - ELECTRICAL SERVICE AND

DISTRIBUTION
Total Deficiency Cost: $6,750
Record ID: 292
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding and/or wall finish is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding and/or wall finish.

Item No.: B2010.10.016
Comments: Signs of water damage noted along bottom
edge of siding.

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 336
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 45/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $23,460
Record ID: 338

ATTACHMENT A

APPENDIX A

A67
Silver Lake Campground
Facility Condition Assessment
Cabin A
PHOTO
NOT

APPLICABLE
Deficiency Description: Wood shake roof is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 200/SF
Description of Work: Remove and replace wood shake roof and replace with metal roofing.

Item No.: B3010.10.007
Comments:

System: B3010 - ROOFING
Total Deficiency Cost: $7,720
Record ID: 339
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $2,500
Record ID: 348
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 349

ATTACHMENT A

APPENDIX A

A68
Silver Lake Campground
Facility Condition Assessment
Cabin A
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 350
PHOTO
NOT

APPLICABLE
Deficiency Description: Exterior wood entrance door is damaged and/or past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace wood door.

Item No.: B2050.10.001
Comments:

System: B2050 - EXTERIOR DOORS AND GRILLES
Total Deficiency Cost: $8,400
Record ID: 599

ATTACHMENT A

APPENDIX A

A69
Silver Lake Campground
Facility Condition Assessment
Cabin B1
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.574
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $64,338
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
A4010 STANDARD SLABS-ON-
GRADE
$5,620 $5,900 - - - -
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $22,341 $23,460 - - - -
B2050 EXTERIOR DOORS AND

GRILLES
$7,997 $8,400 - - - -
B3010 ROOFING $7,354 $7,720 - - - -
D5040 LIGHTING $3,579 $3,760 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
$64,338 $67,560 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$64,338
$67,560

ATTACHMENT A

APPENDIX A

A70
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin B1
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
A4010 - STANDARD

SLABS-ON-GRADE
A4010.10.003 The concrete floor slab
has major damage and
cracks from uplift.

Replace the concrete
slab.
150 SF 1$2,010 $5,900341
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,640342
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 45 SF 1$7,990 $23,460343
B2050 - EXTERIOR

DOORS AND

GRILLES
B2050.10.001 Exterior wood entrance
door is approaching the
end of its useful life.

Replace wood door. 1 EA 1$2,860 $8,400351
B3010 - ROOFING B3010.10.007 Wood shake roof is past
its expected useful life.

Remove and replace
wood shake roof and
replace with metal
roofing.
200 SF 1$2,630 $7,720344
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
1 EA 1$850 $2,500347
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,260345
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $680346

ATTACHMENT A

APPENDIX A

A71
Silver Lake Campground
Facility Condition Assessment
Cabin B1
PHOTO
NOT

APPLICABLE
Deficiency Description: The concrete floor slab has major damage and cracks from uplift.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 150/SF
Description of Work: Replace the concrete slab.

Item No.: A4010.10.003
Comments:

System: A4010 - STANDARD SLABS-ON-GRADE
Total Deficiency Cost: $5,900
Record ID: 341
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 342
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 45/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $23,460
Record ID: 343

ATTACHMENT A

APPENDIX A

A72
Silver Lake Campground
Facility Condition Assessment
Cabin B1
PHOTO
NOT

APPLICABLE
Deficiency Description: Wood shake roof is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 200/SF
Description of Work: Remove and replace wood shake roof and replace with metal roofing.

Item No.: B3010.10.007
Comments:

System: B3010 - ROOFING
Total Deficiency Cost: $7,720
Record ID: 344
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 345
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 346

ATTACHMENT A

APPENDIX A

A73
Silver Lake Campground
Facility Condition Assessment
Cabin B1
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $2,500
Record ID: 347
PHOTO
NOT

APPLICABLE
Deficiency Description: Exterior wood entrance door is
approaching the end of its useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace wood door.

Item No.: B2050.10.001
Comments:

System: B2050 - EXTERIOR DOORS AND GRILLES
Total Deficiency Cost: $8,400
Record ID: 351

ATTACHMENT A

APPENDIX A

A74
Silver Lake Campground
Facility Condition Assessment
Cabin B2
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.459
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $51,364
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $22,341 $23,460 - - - -
B2050 EXTERIOR DOORS AND

GRILLES
$7,997 $8,400 - - - -
D5040 LIGHTING $3,579 $3,760 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
$51,364 $53,940 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$51,364
$53,940

ATTACHMENT A

APPENDIX A

A75
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin B2
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,640352
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 45 SF 1$7,990 $23,460353
B2050 - EXTERIOR

DOORS AND

GRILLES
B2050.10.001 Exterior wood entrance
door is approaching the
end of its useful life.

Replace wood door. 1 EA 1$2,860 $8,400354
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
1 EA 1$850 $2,500355
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,260356
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $680357

ATTACHMENT A

APPENDIX A

A76
Silver Lake Campground
Facility Condition Assessment
Cabin B2
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 352
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 45/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $23,460
Record ID: 353
PHOTO
NOT

APPLICABLE
Deficiency Description: Exterior wood entrance door is
approaching the end of its useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace wood door.

Item No.: B2050.10.001
Comments:

System: B2050 - EXTERIOR DOORS AND GRILLES
Total Deficiency Cost: $8,400
Record ID: 354

ATTACHMENT A

APPENDIX A

A77
Silver Lake Campground
Facility Condition Assessment
Cabin B2
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $2,500
Record ID: 355
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 356
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 357

ATTACHMENT A

APPENDIX A

A78
Silver Lake Campground
Facility Condition Assessment
Cabin D
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.496
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $55,531
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B1010 FLOOR CONSTRUCTION $4,809 $5,050 - - - -
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $22,341 $23,460 - - - -
B3010 ROOFING $7,354 $7,720 - - - -
D5040 LIGHTING $3,579 $3,760 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
$55,531 $58,310 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$55,531
$58,310

ATTACHMENT A

APPENDIX A

A79
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin D
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B1010 - FLOOR

CONSTRUCTION
B1010.20.005 Wood decking is
approaching the end of
its useful life.

Replace the wood deck. 100 SF 1$1,720 $5,050370
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,640363
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 45 SF 1$7,990 $23,460364
B3010 - ROOFING B3010.10.007 Wood shake roof is past
its expected useful life.

Remove and replace
wood shake roof and
replace with metal
roofing.
200 SF 1$2,630 $7,720369
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
1 EA 1$850 $2,500365
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,260366
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $680367

ATTACHMENT A

APPENDIX A

A80
Silver Lake Campground
Facility Condition Assessment
Cabin D
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 363
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 45/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $23,460
Record ID: 364
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $2,500
Record ID: 365

ATTACHMENT A

APPENDIX A

A81
Silver Lake Campground
Facility Condition Assessment
Cabin D
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 366
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 367
PHOTO
NOT

APPLICABLE
Deficiency Description: Wood shake roof is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 200/SF
Description of Work: Remove and replace wood shake roof and replace with metal roofing.

Item No.: B3010.10.007
Comments:

System: B3010 - ROOFING
Total Deficiency Cost: $7,720
Record ID: 369

ATTACHMENT A

APPENDIX A

A82
Silver Lake Campground
Facility Condition Assessment
Cabin D
PHOTO
NOT

APPLICABLE
Deficiency Description: Wood decking is approaching the end of its useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 100/SF
Description of Work: Replace the wood deck.

Item No.: B1010.20.005
Comments:

System: B1010 - FLOOR CONSTRUCTION
Total Deficiency Cost: $5,050
Record ID: 370

ATTACHMENT A

APPENDIX A

A83
Silver Lake Campground
Facility Condition Assessment
Cabin F
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.437
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $48,988
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
A4010 STANDARD SLABS-ON-
GRADE
$5,620 $5,900 - - - -
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $22,341 $23,460 - - - -
D5040 LIGHTING $3,579 $3,760 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
$48,988 $51,440 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$48,988
$51,440

ATTACHMENT A

APPENDIX A

A84
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin F
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
A4010 - STANDARD

SLABS-ON-GRADE
A4010.10.003 The concrete floor slab
has major damage and
cracks from uplift.

Replace the concrete
slab.
150 SF 1$2,010 $5,900598
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,640388
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 45 SF 1$7,990 $23,460389
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
1 EA 1$850 $2,500390
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,260391
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $680392

ATTACHMENT A

APPENDIX A

A85
Silver Lake Campground
Facility Condition Assessment
Cabin F
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 388
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 45/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $23,460
Record ID: 389
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $2,500
Record ID: 390

ATTACHMENT A

APPENDIX A

A86
Silver Lake Campground
Facility Condition Assessment
Cabin F
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 391
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 392
PHOTO
NOT

APPLICABLE
Deficiency Description: The concrete floor slab has major damage and cracks from uplift.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 150/SF
Description of Work: Replace the concrete slab.

Item No.: A4010.10.003
Comments:

System: A4010 - STANDARD SLABS-ON-GRADE
Total Deficiency Cost: $5,900
Record ID: 598

ATTACHMENT A

APPENDIX A

A87
Silver Lake Campground
Facility Condition Assessment
Cabin G1
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.510
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $57,152
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $22,341 $23,460 - - - -
B3010 ROOFING $7,354 $7,720 - - - -
D5020 ELECTRICAL SERVICE AND

DISTRIBUTION
$6,431 $6,750 - - - -
D5040 LIGHTING $3,579 $3,760 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
$57,152 $60,010 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$57,152
$60,010

ATTACHMENT A

APPENDIX A

A88
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin G1
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,640396
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 45 SF 1$7,990 $23,460397
B3010 - ROOFING B3010.10.007 Wood shake roof is past
its expected useful life.

Remove and replace
wood shake roof and
replace with metal
roofing.
200 SF 1$2,630 $7,720177
D5020 -

ELECTRICAL

SERVICE AND

DISTRIBUTION
D5020.30.9114 The outdoor load center
is past its expected
useful life.

Replace the existing
load center with a new
load center.
1 EA 1$2,300 $6,750178
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
1 EA 1$850 $2,500398
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,260399
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $680400

ATTACHMENT A

APPENDIX A

A89
Silver Lake Campground
Facility Condition Assessment
Cabin G1
PHOTO
NOT

APPLICABLE
Deficiency Description: Wood shake roof is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 200/SF
Description of Work: Remove and replace wood shake roof and replace with metal roofing.

Item No.: B3010.10.007
Comments:

System: B3010 - ROOFING
Total Deficiency Cost: $7,720
Record ID: 177
PHOTO
NOT

APPLICABLE
Deficiency Description: The outdoor load center is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing load center with a new load center.

Item No.: D5020.30.9114
Comments:

System: D5020 - ELECTRICAL SERVICE AND

DISTRIBUTION
Total Deficiency Cost: $6,750
Record ID: 178
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 396

ATTACHMENT A

APPENDIX A

A90
Silver Lake Campground
Facility Condition Assessment
Cabin G1
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 45/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $23,460
Record ID: 397
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $2,500
Record ID: 398
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 399

ATTACHMENT A

APPENDIX A

A91
Silver Lake Campground
Facility Condition Assessment
Cabin G1
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 400

ATTACHMENT A

APPENDIX A

A92
Silver Lake Campground
Facility Condition Assessment
Cabin G2
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.464
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $51,952
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $22,341 $23,460 - - - -
B3010 ROOFING $7,354 $7,720 - - - -
D5040 LIGHTING $3,579 $3,760 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
G2030 PEDESTRIAN PLAZAS AND

WALKWAYS
$1,230 $1,290 - - - -
$51,952 $54,550 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$51,952
$54,550

ATTACHMENT A

APPENDIX A

A93
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin G2
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,640401
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 45 SF 1$7,990 $23,460402
B3010 - ROOFING B3010.10.007 Wood shake roof is past
its expected useful life.

Remove and replace
wood shake roof and
replace with metal
roofing.
200 SF 1$2,630 $7,720403
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
1 EA 1$850 $2,500407
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,260404
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $680405
G2030 -

PEDESTRIAN

PLAZAS AND

WALKWAYS
G2030.30.038 Concrete steps are
showing signs of age
and wear.

Replace concrete steps. 2 LFN
S
1$440 $1,290408

ATTACHMENT A

APPENDIX A

A94
Silver Lake Campground
Facility Condition Assessment
Cabin G2
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 401
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 45/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $23,460
Record ID: 402
PHOTO
NOT

APPLICABLE
Deficiency Description: Wood shake roof is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 200/SF
Description of Work: Remove and replace wood shake roof and replace with metal roofing.

Item No.: B3010.10.007
Comments:

System: B3010 - ROOFING
Total Deficiency Cost: $7,720
Record ID: 403

ATTACHMENT A

APPENDIX A

A95
Silver Lake Campground
Facility Condition Assessment
Cabin G2
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 404
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 405
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $2,500
Record ID: 407

ATTACHMENT A

APPENDIX A

A96
Silver Lake Campground
Facility Condition Assessment
Cabin G2
PHOTO
NOT

APPLICABLE
Deficiency Description: Concrete steps are showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 2/LFNS
Description of Work: Replace concrete steps.

Item No.: G2030.30.038
Comments:

System: G2030 - PEDESTRIAN PLAZAS AND

WALKWAYS
Total Deficiency Cost: $1,290
Record ID: 408

ATTACHMENT A

APPENDIX A

A97
Silver Lake Campground
Facility Condition Assessment
Cabin G3
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.392
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $43,871
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $14,875 $15,620 - - - -
B3010 ROOFING $7,354 $7,720 - - - -
D5040 LIGHTING $3,579 $3,760 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
G2030 PEDESTRIAN PLAZAS AND

WALKWAYS
$615 $650 - - - -
$43,871 $46,070 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$43,871
$46,070

ATTACHMENT A

APPENDIX A

A98
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin G3
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,640409
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 30 SF 1$5,320 $15,620410
B3010 - ROOFING B3010.10.002 Metal Roofing is at or
approaching end of
expected useful service
life.

Remove and replace
metal roofing.
200 SF 1$2,630 $7,720411
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
1 EA 1$850 $2,500412
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,260413
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $680414
G2030 -

PEDESTRIAN

PLAZAS AND

WALKWAYS
G2030.30.038 Concrete steps are
showing signs of age
and wear.

Replace concrete steps. 1 LFN
S
1$220 $650415

ATTACHMENT A

APPENDIX A

A99
Silver Lake Campground
Facility Condition Assessment
Cabin G3
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 409
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 30/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $15,620
Record ID: 410
PHOTO
NOT

APPLICABLE
Deficiency Description: Metal Roofing is at or approaching end of expected useful service life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 200/SF
Description of Work: Remove and replace metal roofing.

Item No.: B3010.10.002
Comments:

System: B3010 - ROOFING
Total Deficiency Cost: $7,720
Record ID: 411

ATTACHMENT A

APPENDIX A

A100
Silver Lake Campground
Facility Condition Assessment
Cabin G3
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $2,500
Record ID: 412
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 413
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 414

ATTACHMENT A

APPENDIX A

A101
Silver Lake Campground
Facility Condition Assessment
Cabin G3
PHOTO
NOT

APPLICABLE
Deficiency Description: Concrete steps are showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/LFNS
Description of Work: Replace concrete steps.

Item No.: G2030.30.038
Comments:

System: G2030 - PEDESTRIAN PLAZAS AND

WALKWAYS
Total Deficiency Cost: $650
Record ID: 415

ATTACHMENT A

APPENDIX A

A102
Silver Lake Campground
Facility Condition Assessment
Cabin G4
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.386
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $43,256
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $14,875 $15,620 - - - -
B3010 ROOFING $7,354 $7,720 - - - -
D5040 LIGHTING $3,579 $3,760 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
$43,256 $45,420 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$43,256
$45,420

ATTACHMENT A

APPENDIX A

A103
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin G4
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,640417
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 30 SF 1$5,320 $15,620418
B3010 - ROOFING B3010.10.002 Metal Roofing is at or
approaching end of
expected useful service
life.

Remove and replace
metal roofing.
200 SF 1$2,630 $7,720181
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
1 EA 1$850 $2,500419
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,260420
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $680421

ATTACHMENT A

APPENDIX A

A104
Silver Lake Campground
Facility Condition Assessment
Cabin G4
PHOTO
NOT

APPLICABLE
Deficiency Description: Metal Roofing is at or approaching end of expected useful service life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 200/SF
Description of Work: Remove and replace metal roofing.

Item No.: B3010.10.002
Comments:

System: B3010 - ROOFING
Total Deficiency Cost: $7,720
Record ID: 181
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 417
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 30/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $15,620
Record ID: 418

ATTACHMENT A

APPENDIX A

A105
Silver Lake Campground
Facility Condition Assessment
Cabin G4
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $2,500
Record ID: 419
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 420
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 421

ATTACHMENT A

APPENDIX A

A106
Silver Lake Campground
Facility Condition Assessment
Cabin I
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.535
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $59,948
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $22,341 $23,460 - - - -
B2050 EXTERIOR DOORS AND

GRILLES
$7,997 $8,400 - - - -
B3010 ROOFING $7,354 $7,720 - - - -
D5040 LIGHTING $3,579 $3,760 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
G2030 PEDESTRIAN PLAZAS AND

WALKWAYS
$1,230 $1,290 - - - -
$59,948 $62,950 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$59,948
$62,950

ATTACHMENT A

APPENDIX A

A107
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin I
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,640425
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 45 SF 1$7,990 $23,460426
B2050 - EXTERIOR

DOORS AND

GRILLES
B2050.10.001 Exterior wood entrance
door is approaching the
end of its useful life.

Replace wood door. 1 EA 1$2,860 $8,400155
B3010 - ROOFING B3010.10.002 Metal Roofing is at or
approaching end of
expected useful service
life.

Remove and replace
metal roofing.
200 SF 1$2,630 $7,720427
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
1 EA 1$850 $2,500153
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,260429
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $680430
G2030 -

PEDESTRIAN

PLAZAS AND

WALKWAYS
G2030.30.038 Concrete steps are
showing signs of age
and wear.

Replace concrete steps. 2 LFN
S
1$440 $1,290432

ATTACHMENT A

APPENDIX A

A108
Silver Lake Campground
Facility Condition Assessment
Cabin I
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $2,500
Record ID: 153
PHOTO
NOT

APPLICABLE
Deficiency Description: Exterior wood entrance door is
approaching the end of its useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace wood door.

Item No.: B2050.10.001
Comments:

System: B2050 - EXTERIOR DOORS AND GRILLES
Total Deficiency Cost: $8,400
Record ID: 155
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 425

ATTACHMENT A

APPENDIX A

A109
Silver Lake Campground
Facility Condition Assessment
Cabin I
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 45/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $23,460
Record ID: 426
PHOTO
NOT

APPLICABLE
Deficiency Description: Metal Roofing is at or approaching end of expected useful service life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 200/SF
Description of Work: Remove and replace metal roofing.

Item No.: B3010.10.002
Comments:

System: B3010 - ROOFING
Total Deficiency Cost: $7,720
Record ID: 427
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 429

ATTACHMENT A

APPENDIX A

A110
Silver Lake Campground
Facility Condition Assessment
Cabin I
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 430
PHOTO
NOT

APPLICABLE
Deficiency Description: Concrete steps are showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 2/LFNS
Description of Work: Replace concrete steps.

Item No.: G2030.30.038
Comments:

System: G2030 - PEDESTRIAN PLAZAS AND

WALKWAYS
Total Deficiency Cost: $1,290
Record ID: 432

ATTACHMENT A

APPENDIX A

A111
Silver Lake Campground
Facility Condition Assessment
Cabin J
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.461
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $51,616
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $14,875 $15,620 - - - -
B2050 EXTERIOR DOORS AND

GRILLES
$7,997 $8,400 - - - -
B3010 ROOFING $7,354 $7,720 - - - -
D5040 LIGHTING $3,579 $3,760 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
G4010 SITE ELECTRIC

DISTRIBUTION SYSTEMS
$363 $380 - - - -
$51,616 $54,200 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$51,616
$54,200

ATTACHMENT A

APPENDIX A

A112
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin J
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,640434
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 30 SF 1$5,320 $15,620435
B2050 - EXTERIOR

DOORS AND

GRILLES
B2050.10.001 Exterior wood entrance
door is approaching the
end of its useful life.

Replace wood door. 1 EA 1$2,860 $8,400144
B3010 - ROOFING B3010.10.007 Wood shake roof is past
its expected useful life.

Remove and replace
wood shake roof and
replace with metal
roofing.
200 SF 1$2,630 $7,720146
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
1 EA 1$850 $2,500145
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,260437
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $680438
G4010 - SITE

ELECTRIC

DISTRIBUTION

SYSTEMS
G4010.10.001 The wiring device (outlet
box, junction box,
receptacle, etc.) needs
to be replaced.

Supply and install a new
junction box and cover.
1 EA 1$130 $380147

ATTACHMENT A

APPENDIX A

A113
Silver Lake Campground
Facility Condition Assessment
Cabin J
PHOTO
NOT

APPLICABLE
Deficiency Description: Exterior wood entrance door is
approaching the end of its useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace wood door.

Item No.: B2050.10.001
Comments:

System: B2050 - EXTERIOR DOORS AND GRILLES
Total Deficiency Cost: $8,400
Record ID: 144
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $2,500
Record ID: 145
PHOTO
NOT

APPLICABLE
Deficiency Description: Wood shake roof is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 200/SF
Description of Work: Remove and replace wood shake roof and replace with metal roofing.

Item No.: B3010.10.007
Comments:

System: B3010 - ROOFING
Total Deficiency Cost: $7,720
Record ID: 146

ATTACHMENT A

APPENDIX A

A114
Silver Lake Campground
Facility Condition Assessment
Cabin J
PHOTO
NOT

APPLICABLE
Deficiency Description: The wiring device (outlet box, junction box, receptacle, etc.) needs to be replaced.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Supply and install a new junction box and cover.

Item No.: G4010.10.001
Comments:

System: G4010 - SITE ELECTRIC DISTRIBUTION

SYSTEMS
Total Deficiency Cost: $380
Record ID: 147
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 434
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 30/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $15,620
Record ID: 435

ATTACHMENT A

APPENDIX A

A115
Silver Lake Campground
Facility Condition Assessment
Cabin J
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 437
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 438

ATTACHMENT A

APPENDIX A

A116
Silver Lake Campground
Facility Condition Assessment
Cabin K
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.464
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $51,952
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $22,341 $23,460 - - - -
B3010 ROOFING $7,354 $7,720 - - - -
D5040 LIGHTING $3,579 $3,760 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
G2030 PEDESTRIAN PLAZAS AND

WALKWAYS
$1,230 $1,290 - - - -
$51,952 $54,550 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$51,952
$54,550

ATTACHMENT A

APPENDIX A

A117
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin K
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,640452
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 45 SF 1$7,990 $23,460440
B3010 - ROOFING B3010.10.007 Wood shake roof is past
its expected useful life.

Remove and replace
wood shake roof and
replace with metal
roofing.
200 SF 1$2,630 $7,720156
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
1 EA 1$850 $2,500439
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,260150
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $680149
G2030 -

PEDESTRIAN

PLAZAS AND

WALKWAYS
G2030.30.038 Concrete steps are
showing signs of age
and wear.

Replace concrete steps. 2 LFN
S
1$440 $1,290152

ATTACHMENT A

APPENDIX A

A118
Silver Lake Campground
Facility Condition Assessment
Cabin K
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 149
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 150
PHOTO
NOT

APPLICABLE
Deficiency Description: Concrete steps are showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 2/LFNS
Description of Work: Replace concrete steps.

Item No.: G2030.30.038
Comments:

System: G2030 - PEDESTRIAN PLAZAS AND

WALKWAYS
Total Deficiency Cost: $1,290
Record ID: 152

ATTACHMENT A

APPENDIX A

A119
Silver Lake Campground
Facility Condition Assessment
Cabin K
PHOTO
NOT

APPLICABLE
Deficiency Description: Wood shake roof is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 200/SF
Description of Work: Remove and replace wood shake roof and replace with metal roofing.

Item No.: B3010.10.007
Comments:

System: B3010 - ROOFING
Total Deficiency Cost: $7,720
Record ID: 156
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $2,500
Record ID: 439
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 45/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $23,460
Record ID: 440

ATTACHMENT A

APPENDIX A

A120
Silver Lake Campground
Facility Condition Assessment
Cabin K
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 452

ATTACHMENT A

APPENDIX A

A121
Silver Lake Campground
Facility Condition Assessment
Cabin L1-L2-L3
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.405
Condition Rating: CRITICALReplacement Cost/SF: $602
Capital Renewal Cost: $109,663
Replacement Cost: $271,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $38,418 $40,340 - - - -
B2020 EXTERIOR WINDOWS $37,216 $39,080 - - - -
B2050 EXTERIOR DOORS AND

GRILLES
$21,055 $22,110 - - - -
D5040 LIGHTING $10,681 $11,220 - - - -
D7050 DETECTION AND ALARM $1,929 $2,030 - - - -
G4010 SITE ELECTRIC

DISTRIBUTION SYSTEMS
$363 $380 - - - -
$109,663 $115,160 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$109,663
$115,160

ATTACHMENT A

APPENDIX A

A122
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin L1-L2-L3
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
1,600 SF 1$13,740 $40,340574
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 75 SF 1$13,310 $39,080573
B2050 - EXTERIOR

DOORS AND

GRILLES
B2050.10.006 Exterior aluminum
entrance door, frame
and hardware is
approaching the end of
its useful life.

Replace aluminum door,
frame, and hardware.
3 EA 1$7,530 $22,110167
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
3 EA 1$2,540 $7,460169
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
3 EA 1$1,280 $3,760575
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
3 EA 1$690 $2,030576
G4010 - SITE

ELECTRIC

DISTRIBUTION

SYSTEMS
G4010.10.001 The wiring device (outlet
box, junction box,
receptacle, etc.) needs
to be replaced.

Supply and install a new
junction box and cover.
1 EA 1$130 $380168

ATTACHMENT A

APPENDIX A

A123
Silver Lake Campground
Facility Condition Assessment
Cabin L1-L2-L3
PHOTO
NOT

APPLICABLE
Deficiency Description: Exterior aluminum entrance door, frame and hardware is approaching the end of its
useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 3/EA
Description of Work: Replace aluminum door, frame, and
hardware.

Item No.: B2050.10.006
Comments:

System: B2050 - EXTERIOR DOORS AND GRILLES
Total Deficiency Cost: $22,110
Record ID: 167
PHOTO
NOT

APPLICABLE
Deficiency Description: The wiring device (outlet box, junction box, receptacle, etc.) needs to be replaced.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Supply and install a new junction box and cover.

Item No.: G4010.10.001
Comments:

System: G4010 - SITE ELECTRIC DISTRIBUTION

SYSTEMS
Total Deficiency Cost: $380
Record ID: 168
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 3/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $7,460
Record ID: 169

ATTACHMENT A

APPENDIX A

A124
Silver Lake Campground
Facility Condition Assessment
Cabin L1-L2-L3
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 75/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $39,080
Record ID: 573
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1,600/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $40,340
Record ID: 574
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 3/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $3,760
Record ID: 575

ATTACHMENT A

APPENDIX A

A125
Silver Lake Campground
Facility Condition Assessment
Cabin L1-L2-L3
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 3/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $2,030
Record ID: 576

ATTACHMENT A

APPENDIX A

A126
Silver Lake Campground
Facility Condition Assessment
Cabin M
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.524
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $58,718
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $22,341 $23,460 - - - -
B2050 EXTERIOR DOORS AND

GRILLES
$7,997 $8,400 - - - -
B3010 ROOFING $7,354 $7,720 - - - -
D5040 LIGHTING $3,579 $3,760 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
$58,718 $61,660 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$58,718
$61,660

ATTACHMENT A

APPENDIX A

A127
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin M
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding and/or wall finish
is showing signs of age
and wear.

Power wash and repaint
existing wood board
siding and/or wall finish.
700 SF 1$6,010 $17,640453
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 45 SF 1$7,990 $23,460441
B2050 - EXTERIOR

DOORS AND

GRILLES
B2050.10.001 Exterior wood entrance
door is damaged and/or
past its expected useful
life.

Replace wood door. 1 EA 1$2,860 $8,400448
B3010 - ROOFING B3010.10.007 Wood shake roof is past
its expected useful life.

Remove and replace
wood shake roof and
replace with metal
roofing.
200 SF 1$2,630 $7,720442
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
1 EA 1$850 $2,500443
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing fixtures
with LED fixtures.
1 EA 1$430 $1,260445
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $680444

ATTACHMENT A

APPENDIX A

A128
Silver Lake Campground
Facility Condition Assessment
Cabin M
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 45/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $23,460
Record ID: 441
PHOTO
NOT

APPLICABLE
Deficiency Description: Wood shake roof is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 200/SF
Description of Work: Remove and replace wood shake roof and replace with metal roofing.

Item No.: B3010.10.007
Comments:

System: B3010 - ROOFING
Total Deficiency Cost: $7,720
Record ID: 442
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $2,500
Record ID: 443

ATTACHMENT A

APPENDIX A

A129
Silver Lake Campground
Facility Condition Assessment
Cabin M
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 444
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 445
PHOTO
NOT

APPLICABLE
Deficiency Description: Exterior wood entrance door is damaged and/or past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace wood door.

Item No.: B2050.10.001
Comments:

System: B2050 - EXTERIOR DOORS AND GRILLES
Total Deficiency Cost: $8,400
Record ID: 448

ATTACHMENT A

APPENDIX A

A130
Silver Lake Campground
Facility Condition Assessment
Cabin M
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding and/or wall finish is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding and/or wall finish.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 453

ATTACHMENT A

APPENDIX A

A131
Silver Lake Campground
Facility Condition Assessment
Cabin M2
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.387
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $43,368
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $22,341 $23,460 - - - -
D5040 LIGHTING $3,579 $3,760 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
$43,368 $45,540 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$43,368
$45,540

ATTACHMENT A

APPENDIX A

A132
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin M2
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding and/or wall finish
is showing signs of age
and wear.

Power wash and repaint
existing wood board
siding and/or wall finish.
700 SF 1$6,010 $17,640649
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 45 SF 1$7,990 $23,460650
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
1 EA 1$850 $2,500652
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing fixtures
with LED fixtures.
1 EA 1$430 $1,260653
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $680651

ATTACHMENT A

APPENDIX A

A133
Silver Lake Campground
Facility Condition Assessment
Cabin M2
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding and/or wall finish is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding and/or wall finish.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 649
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 45/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $23,460
Record ID: 650
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 651

ATTACHMENT A

APPENDIX A

A134
Silver Lake Campground
Facility Condition Assessment
Cabin M2
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $2,500
Record ID: 652
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 653

ATTACHMENT A

APPENDIX A

A135
Silver Lake Campground
Facility Condition Assessment
Cabin N
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.453
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $50,721
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $22,341 $23,460 - - - -
B3010 ROOFING $7,354 $7,720 - - - -
D5040 LIGHTING $3,579 $3,760 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
$50,721 $53,260 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$50,721
$53,260

ATTACHMENT A

APPENDIX A

A136
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin N
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,640454
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 45 SF 1$7,990 $23,460450
B3010 - ROOFING B3010.10.007 Wood shake roof is past
its expected useful life.

Remove and replace
wood shake roof and
replace with metal
roofing.
200 SF 1$2,630 $7,720449
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
1 EA 1$850 $2,500456
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,260458
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $680457

ATTACHMENT A

APPENDIX A

A137
Silver Lake Campground
Facility Condition Assessment
Cabin N
PHOTO
NOT

APPLICABLE
Deficiency Description: Wood shake roof is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 200/SF
Description of Work: Remove and replace wood shake roof and replace with metal roofing.

Item No.: B3010.10.007
Comments:

System: B3010 - ROOFING
Total Deficiency Cost: $7,720
Record ID: 449
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 45/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $23,460
Record ID: 450
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 454

ATTACHMENT A

APPENDIX A

A138
Silver Lake Campground
Facility Condition Assessment
Cabin N
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $2,500
Record ID: 456
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 457
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 458

ATTACHMENT A

APPENDIX A

A139
Silver Lake Campground
Facility Condition Assessment
Cabin O
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.448
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $50,190
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $22,341 $23,460 - - - -
B3010 ROOFING $7,354 $7,720 - - - -
D5040 LIGHTING $1,202 $1,260 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
G2030 PEDESTRIAN PLAZAS AND

WALKWAYS
$1,845 $1,940 - - - -
$50,190 $52,700 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$50,190
$52,700

ATTACHMENT A

APPENDIX A

A140
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin O
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,64041
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 45 SF 1$7,990 $23,46046
B3010 - ROOFING B3010.10.007 Wood shake roof is past
its expected useful life.

Remove and replace
wood shake roof and
replace with metal
roofing.
200 SF 1$2,630 $7,72043
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,26056
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $68055
G2030 -

PEDESTRIAN

PLAZAS AND

WALKWAYS
G2030.30.038 Concrete steps are
showing signs of age
and wear.

Replace concrete steps. 3 LFN
S
1$660 $1,94045

ATTACHMENT A

APPENDIX A

A141
Silver Lake Campground
Facility Condition Assessment
Cabin O
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 41
PHOTO
NOT

APPLICABLE
Deficiency Description: Wood shake roof is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 200/SF
Description of Work: Remove and replace wood shake roof and replace with metal roofing.

Item No.: B3010.10.007
Comments:

System: B3010 - ROOFING
Total Deficiency Cost: $7,720
Record ID: 43
PHOTO
NOT

APPLICABLE
Deficiency Description: Concrete steps are showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 3/LFNS
Description of Work: Replace concrete steps.

Item No.: G2030.30.038
Comments:

System: G2030 - PEDESTRIAN PLAZAS AND

WALKWAYS
Total Deficiency Cost: $1,940
Record ID: 45

ATTACHMENT A

APPENDIX A

A142
Silver Lake Campground
Facility Condition Assessment
Cabin O
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 45/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $23,460
Record ID: 46
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 55
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 56

ATTACHMENT A

APPENDIX A

A143
Silver Lake Campground
Facility Condition Assessment
Cabin P
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.453
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $50,721
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $22,341 $23,460 - - - -
B3010 ROOFING $7,354 $7,720 - - - -
D5040 LIGHTING $3,579 $3,760 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
$50,721 $53,260 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$50,721
$53,260

ATTACHMENT A

APPENDIX A

A144
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin P
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,64054
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 45 SF 1$7,990 $23,46052
B3010 - ROOFING B3010.10.007 Wood shake roof is past
its expected useful life.

Remove and replace
wood shake roof and
replace with metal
roofing.
200 SF 1$2,630 $7,72053
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
1 EA 1$850 $2,5004
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,26051
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $68049

ATTACHMENT A

APPENDIX A

A145
Silver Lake Campground
Facility Condition Assessment
Cabin P
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments: The cable to the exterior light is routed
from a nearby tree. The light fixture is
hanging from the tree currently.

System: D5040 - LIGHTING
Total Deficiency Cost: $2,500
Record ID: 4
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 49
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 51

ATTACHMENT A

APPENDIX A

A146
Silver Lake Campground
Facility Condition Assessment
Cabin P
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 45/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $23,460
Record ID: 52
PHOTO
NOT

APPLICABLE
Deficiency Description: Wood shake roof is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 200/SF
Description of Work: Remove and replace wood shake roof and replace with metal roofing.

Item No.: B3010.10.007
Comments: Shake Roof
System: B3010 - ROOFING
Total Deficiency Cost: $7,720
Record ID: 53
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 54

ATTACHMENT A

APPENDIX A

A147
Silver Lake Campground
Facility Condition Assessment
Cabin Q1
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.482
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $53,965
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
A4010 STANDARD SLABS-ON-
GRADE
$5,620 $5,900 - - - -
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $22,341 $23,460 - - - -
B3010 ROOFING $7,354 $7,720 - - - -
D5040 LIGHTING $1,202 $1,260 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
$53,965 $56,660 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$53,965
$56,660

ATTACHMENT A

APPENDIX A

A148
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin Q1
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
A4010 - STANDARD

SLABS-ON-GRADE
A4010.10.003 The concrete floor slab
has major damage and
cracks from uplift.

Replace the concrete
slab.
150 SF 1$2,010 $5,9006
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,64057
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 45 SF 1$7,990 $23,460104
B3010 - ROOFING B3010.10.007 Wood shake roof is past
its expected useful life.

Remove and replace
wood shake roof and
replace with metal
roofing.
200 SF 1$2,630 $7,72058
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,26060
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $68059

ATTACHMENT A

APPENDIX A

A149
Silver Lake Campground
Facility Condition Assessment
Cabin Q1
PHOTO
NOT

APPLICABLE
Deficiency Description: The concrete floor slab has major damage and cracks from uplift.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 150/SF
Description of Work: Replace the concrete slab.

Item No.: A4010.10.003
Comments: Concrete floor slab is severly damaged
from uplift caused from roots of nearby
tree.

System: A4010 - STANDARD SLABS-ON-GRADE
Total Deficiency Cost: $5,900
Record ID: 6
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 57
PHOTO
NOT

APPLICABLE
Deficiency Description: Wood shake roof is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 200/SF
Description of Work: Remove and replace wood shake roof and replace with metal roofing.

Item No.: B3010.10.007
Comments:

System: B3010 - ROOFING
Total Deficiency Cost: $7,720
Record ID: 58

ATTACHMENT A

APPENDIX A

A150
Silver Lake Campground
Facility Condition Assessment
Cabin Q1
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 59
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 60
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 45/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $23,460
Record ID: 104

ATTACHMENT A

APPENDIX A

A151
Silver Lake Campground
Facility Condition Assessment
Cabin Q2
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.387
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $43,368
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $22,341 $23,460 - - - -
D5040 LIGHTING $3,579 $3,760 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
$43,368 $45,540 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$43,368
$45,540

ATTACHMENT A

APPENDIX A

A152
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin Q2
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,64062
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 45 SF 1$7,990 $23,46064
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
1 EA 1$850 $2,50063
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,26065
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $68066

ATTACHMENT A

APPENDIX A

A153
Silver Lake Campground
Facility Condition Assessment
Cabin Q2
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 62
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $2,500
Record ID: 63
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 45/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $23,460
Record ID: 64

ATTACHMENT A

APPENDIX A

A154
Silver Lake Campground
Facility Condition Assessment
Cabin Q2
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 65
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 66

ATTACHMENT A

APPENDIX A

A155
Silver Lake Campground
Facility Condition Assessment
Cabin R1
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.453
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $50,721
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $22,341 $23,460 - - - -
B3010 ROOFING $7,354 $7,720 - - - -
D5040 LIGHTING $3,579 $3,760 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
$50,721 $53,260 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$50,721
$53,260

ATTACHMENT A

APPENDIX A

A156
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin R1
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,64067
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 45 SF 1$7,990 $23,46074
B3010 - ROOFING B3010.10.007 Wood shake roof is past
its expected useful life.

Remove and replace
wood shake roof and
replace with metal
roofing.
200 SF 1$2,630 $7,72068
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
1 EA 1$850 $2,50071
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,26073
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $68072

ATTACHMENT A

APPENDIX A

A157
Silver Lake Campground
Facility Condition Assessment
Cabin R1
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 67
PHOTO
NOT

APPLICABLE
Deficiency Description: Wood shake roof is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 200/SF
Description of Work: Remove and replace wood shake roof and replace with metal roofing.

Item No.: B3010.10.007
Comments: Shake Roof
System: B3010 - ROOFING
Total Deficiency Cost: $7,720
Record ID: 68
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $2,500
Record ID: 71

ATTACHMENT A

APPENDIX A

A158
Silver Lake Campground
Facility Condition Assessment
Cabin R1
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 72
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 73
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 45/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $23,460
Record ID: 74

ATTACHMENT A

APPENDIX A

A159
Silver Lake Campground
Facility Condition Assessment
Cabin R2
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.432
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $48,345
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $22,341 $23,460 - - - -
B3010 ROOFING $7,354 $7,720 - - - -
D5040 LIGHTING $1,202 $1,260 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
$48,345 $50,760 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$48,345
$50,760

ATTACHMENT A

APPENDIX A

A160
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin R2
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,64076
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 45 SF 1$7,990 $23,46077
B3010 - ROOFING B3010.10.007 Wood shake roof is past
its expected useful life.

Remove and replace
wood shake roof and
replace with metal
roofing.
200 SF 1$2,630 $7,72075
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,26079
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $68078

ATTACHMENT A

APPENDIX A

A161
Silver Lake Campground
Facility Condition Assessment
Cabin R2
PHOTO
NOT

APPLICABLE
Deficiency Description: Wood shake roof is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 200/SF
Description of Work: Remove and replace wood shake roof and replace with metal roofing.

Item No.: B3010.10.007
Comments: Shake Roof
System: B3010 - ROOFING
Total Deficiency Cost: $7,720
Record ID: 75
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 76
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 45/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $23,460
Record ID: 77

ATTACHMENT A

APPENDIX A

A162
Silver Lake Campground
Facility Condition Assessment
Cabin R2
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 78
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 79

ATTACHMENT A

APPENDIX A

A163
Silver Lake Campground
Facility Condition Assessment
Cabin S1
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.534
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $59,781
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $22,341 $23,460 - - - -
B2050 EXTERIOR DOORS AND

GRILLES
$5,005 $5,260 - - - -
B3010 ROOFING $7,354 $7,720 - - - -
D5020 ELECTRICAL SERVICE AND

DISTRIBUTION
$6,431 $6,750 - - - -
D5040 LIGHTING $1,202 $1,260 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
$59,781 $62,770 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$59,781
$62,770

ATTACHMENT A

APPENDIX A

A164
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin S1
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,64080
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 45 SF 1$7,990 $23,46083
B2050 - EXTERIOR

DOORS AND

GRILLES
B2050.10.007 Exterior wood door is
damaged or
deteriorating.

Refurbish/repair wood
door.
1 EA 1$1,790 $5,26086
B3010 - ROOFING B3010.10.007 Wood shake roof is past
its expected useful life.

Remove and replace
wood shake roof and
replace with metal
roofing.
200 SF 1$2,630 $7,72081
D5020 -

ELECTRICAL

SERVICE AND

DISTRIBUTION
D5020.30.9114 The outdoor load center
is past its expected
useful life.

Replace the existing
load center with a new
load center.
1 EA 1$2,300 $6,75082
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,26085
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $68084

ATTACHMENT A

APPENDIX A

A165
Silver Lake Campground
Facility Condition Assessment
Cabin S1
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 80
PHOTO
NOT

APPLICABLE
Deficiency Description: Wood shake roof is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 200/SF
Description of Work: Remove and replace wood shake roof and replace with metal roofing.

Item No.: B3010.10.007
Comments:

System: B3010 - ROOFING
Total Deficiency Cost: $7,720
Record ID: 81
PHOTO
NOT

APPLICABLE
Deficiency Description: The outdoor load center is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing load center with a new load center.

Item No.: D5020.30.9114
Comments:

System: D5020 - ELECTRICAL SERVICE AND

DISTRIBUTION
Total Deficiency Cost: $6,750
Record ID: 82

ATTACHMENT A

APPENDIX A

A166
Silver Lake Campground
Facility Condition Assessment
Cabin S1
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 45/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $23,460
Record ID: 83
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 84
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 85

ATTACHMENT A

APPENDIX A

A167
Silver Lake Campground
Facility Condition Assessment
Cabin S1
PHOTO
NOT

APPLICABLE
Deficiency Description: Exterior wood door is damaged or deteriorating.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Refurbish/repair wood door.

Item No.: B2050.10.007
Comments:

System: B2050 - EXTERIOR DOORS AND GRILLES
Total Deficiency Cost: $5,260
Record ID: 86

ATTACHMENT A

APPENDIX A

A168
Silver Lake Campground
Facility Condition Assessment
Cabin S2
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.432
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $48,345
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $22,341 $23,460 - - - -
B3010 ROOFING $7,354 $7,720 - - - -
D5040 LIGHTING $1,202 $1,260 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
$48,345 $50,760 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$48,345
$50,760

ATTACHMENT A

APPENDIX A

A169
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin S2
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,64088
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 45 SF 1$7,990 $23,46089
B3010 - ROOFING B3010.10.007 Wood shake roof is past
its expected useful life.

Remove and replace
wood shake roof and
replace with metal
roofing.
200 SF 1$2,630 $7,72087
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,26091
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $68090

ATTACHMENT A

APPENDIX A

A170
Silver Lake Campground
Facility Condition Assessment
Cabin S2
PHOTO
NOT

APPLICABLE
Deficiency Description: Wood shake roof is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 200/SF
Description of Work: Remove and replace wood shake roof and replace with metal roofing.

Item No.: B3010.10.007
Comments: Shake Roof
System: B3010 - ROOFING
Total Deficiency Cost: $7,720
Record ID: 87
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 88
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 45/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $23,460
Record ID: 89

ATTACHMENT A

APPENDIX A

A171
Silver Lake Campground
Facility Condition Assessment
Cabin S2
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 90
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 91

ATTACHMENT A

APPENDIX A

A172
Silver Lake Campground
Facility Condition Assessment
Cabin S3
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.387
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $43,368
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $22,341 $23,460 - - - -
D5040 LIGHTING $3,579 $3,760 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
$43,368 $45,540 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$43,368
$45,540

ATTACHMENT A

APPENDIX A

A173
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin S3
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,64093
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 45 SF 1$7,990 $23,46094
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
1 EA 1$850 $2,50095
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,26097
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $68096

ATTACHMENT A

APPENDIX A

A174
Silver Lake Campground
Facility Condition Assessment
Cabin S3
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 93
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 45/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $23,460
Record ID: 94
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $2,500
Record ID: 95

ATTACHMENT A

APPENDIX A

A175
Silver Lake Campground
Facility Condition Assessment
Cabin S3
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 96
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 97

ATTACHMENT A

APPENDIX A

A176
Silver Lake Campground
Facility Condition Assessment
Cabin S4
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: C
FCI: 0.188
Condition Rating: POORReplacement Cost/SF: $747
Capital Renewal Cost: $21,027
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
D5040 LIGHTING $3,579 $3,760 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
$21,027 $22,080 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$21,027
$22,080

ATTACHMENT A

APPENDIX A

A177
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin S4
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,640103
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
1 EA 1$850 $2,50099
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,260101
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $680100

ATTACHMENT A

APPENDIX A

A178
Silver Lake Campground
Facility Condition Assessment
Cabin S4
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $2,500
Record ID: 99
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 100
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 101

ATTACHMENT A

APPENDIX A

A179
Silver Lake Campground
Facility Condition Assessment
Cabin S4
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 103

ATTACHMENT A

APPENDIX A

A180
Silver Lake Campground
Facility Condition Assessment
Cabin T1
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.515
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $57,684
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $22,341 $23,460 - - - -
B3010 ROOFING $5,536 $5,810 - - - -
D5020 ELECTRICAL SERVICE AND

DISTRIBUTION
$6,431 $6,750 - - - -
D5040 LIGHTING $5,928 $6,220 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
$57,684 $60,560 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$57,684
$60,560

ATTACHMENT A

APPENDIX A

A181
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin T1
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,640459
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 45 SF 1$7,990 $23,460460
B3010 - ROOFING B3010.10.007 Wood shake roof is past
its expected useful life.

Remove and replace
wood shake roof and
replace with metal
roofing.
150 SF 1$1,980 $5,810464
D5020 -

ELECTRICAL

SERVICE AND

DISTRIBUTION
D5020.30.9114 The outdoor load center
is past its expected
useful life.

Replace the existing
load center with a new
load center.
1 EA 1$2,300 $6,750269
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
2 EA 1$1,690 $4,960461
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,260462
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $680463

ATTACHMENT A

APPENDIX A

A182
Silver Lake Campground
Facility Condition Assessment
Cabin T1
PHOTO
NOT

APPLICABLE
Deficiency Description: The outdoor load center is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing load center with a new load center.

Item No.: D5020.30.9114
Comments:

System: D5020 - ELECTRICAL SERVICE AND

DISTRIBUTION
Total Deficiency Cost: $6,750
Record ID: 269
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 459
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 45/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $23,460
Record ID: 460

ATTACHMENT A

APPENDIX A

A183
Silver Lake Campground
Facility Condition Assessment
Cabin T1
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 2/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $4,960
Record ID: 461
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 462
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 463

ATTACHMENT A

APPENDIX A

A184
Silver Lake Campground
Facility Condition Assessment
Cabin T1
PHOTO
NOT

APPLICABLE
Deficiency Description: Wood shake roof is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 150/SF
Description of Work: Remove and replace wood shake roof and replace with metal roofing.

Item No.: B3010.10.007
Comments:

System: B3010 - ROOFING
Total Deficiency Cost: $5,810
Record ID: 464

ATTACHMENT A

APPENDIX A

A185
Silver Lake Campground
Facility Condition Assessment
Cabin T2
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.524
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $58,718
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $22,341 $23,460 - - - -
B2050 EXTERIOR DOORS AND

GRILLES
$7,997 $8,400 - - - -
B3010 ROOFING $7,354 $7,720 - - - -
D5040 LIGHTING $3,579 $3,760 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
$58,718 $61,660 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$58,718
$61,660

ATTACHMENT A

APPENDIX A

A186
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin T2
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,640466
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 45 SF 1$7,990 $23,460467
B2050 - EXTERIOR

DOORS AND

GRILLES
B2050.10.001 Exterior wood entrance
door is approaching the
end of its useful life.

Replace wood door. 1 EA 1$2,860 $8,400471
B3010 - ROOFING B3010.10.007 Wood shake roof is past
its expected useful life.

Remove and replace
wood shake roof and
replace with metal
roofing.
200 SF 1$2,630 $7,720465
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
1 EA 1$850 $2,500468
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,260469
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $680470

ATTACHMENT A

APPENDIX A

A187
Silver Lake Campground
Facility Condition Assessment
Cabin T2
PHOTO
NOT

APPLICABLE
Deficiency Description: Wood shake roof is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 200/SF
Description of Work: Remove and replace wood shake roof and replace with metal roofing.

Item No.: B3010.10.007
Comments:

System: B3010 - ROOFING
Total Deficiency Cost: $7,720
Record ID: 465
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 466
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 45/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $23,460
Record ID: 467

ATTACHMENT A

APPENDIX A

A188
Silver Lake Campground
Facility Condition Assessment
Cabin T2
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $2,500
Record ID: 468
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 469
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 470

ATTACHMENT A

APPENDIX A

A189
Silver Lake Campground
Facility Condition Assessment
Cabin T2
PHOTO
NOT

APPLICABLE
Deficiency Description: Exterior wood entrance door is
approaching the end of its useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace wood door.

Item No.: B2050.10.001
Comments:

System: B2050 - EXTERIOR DOORS AND GRILLES
Total Deficiency Cost: $8,400
Record ID: 471

ATTACHMENT A

APPENDIX A

A190
Silver Lake Campground
Facility Condition Assessment
Cabin T3
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.377
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $42,249
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $22,341 $23,460 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
G2030 PEDESTRIAN PLAZAS AND

WALKWAYS
$2,461 $2,580 - - - -
$42,249 $44,360 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$42,249
$44,360

ATTACHMENT A

APPENDIX A

A191
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin T3
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,640109
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 45 SF 1$7,990 $23,460110
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.

EA 1106
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $680107
G2030 -

PEDESTRIAN

PLAZAS AND

WALKWAYS
G2030.30.038 4 LFN
S
1$880 $2,580105

ATTACHMENT A

APPENDIX A

A192
Silver Lake Campground
Facility Condition Assessment
Cabin T3
PHOTO
NOT

APPLICABLE
Deficiency Description:

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 4/LFNS
Description of Work:

Item No.: G2030.30.038
Comments:

System: G2030 - PEDESTRIAN PLAZAS AND

WALKWAYS
Total Deficiency Cost: $2,580
Record ID: 105
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: /EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost:

Record ID: 106
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments: Smoke detector is missing.

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 107

ATTACHMENT A

APPENDIX A

A193
Silver Lake Campground
Facility Condition Assessment
Cabin T3
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 109
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 45/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $23,460
Record ID: 110

ATTACHMENT A

APPENDIX A

A194
Silver Lake Campground
Facility Condition Assessment
Cabin T4
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.387
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $43,368
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $22,341 $23,460 - - - -
D5040 LIGHTING $3,579 $3,760 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
$43,368 $45,540 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$43,368
$45,540

ATTACHMENT A

APPENDIX A

A195
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin T4
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,640116
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 45 SF 1$7,990 $23,460117
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
1 EA 1$850 $2,500112
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,260114
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $680113

ATTACHMENT A

APPENDIX A

A196
Silver Lake Campground
Facility Condition Assessment
Cabin T4
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments: Exterior light fixture and conduit is
detached and hanging off the rear of cabin.

System: D5040 - LIGHTING
Total Deficiency Cost: $2,500
Record ID: 112
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 113
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 114

ATTACHMENT A

APPENDIX A

A197
Silver Lake Campground
Facility Condition Assessment
Cabin T4
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 116
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 45/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $23,460
Record ID: 117

ATTACHMENT A

APPENDIX A

A198
Silver Lake Campground
Facility Condition Assessment
Cabin T5
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.388
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $43,451
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $22,341 $23,460 - - - -
D5040 LIGHTING $1,202 $1,260 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
G2030 PEDESTRIAN PLAZAS AND

WALKWAYS
$2,461 $2,580 - - - -
$43,451 $45,620 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$43,451
$45,620

ATTACHMENT A

APPENDIX A

A199
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin T5
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,640122
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 45 SF 1$7,990 $23,460123
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,260120
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $680119
G2030 -

PEDESTRIAN

PLAZAS AND

WALKWAYS
G2030.30.038 Concrete steps are
showing signs of age
and wear.

Replace concrete steps. 4 LFN
S
1$880 $2,580118

ATTACHMENT A

APPENDIX A

A200
Silver Lake Campground
Facility Condition Assessment
Cabin T5
PHOTO
NOT

APPLICABLE
Deficiency Description: Concrete steps are showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 4/LFNS
Description of Work: Replace concrete steps.

Item No.: G2030.30.038
Comments:

System: G2030 - PEDESTRIAN PLAZAS AND

WALKWAYS
Total Deficiency Cost: $2,580
Record ID: 118
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 119
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 120

ATTACHMENT A

APPENDIX A

A201
Silver Lake Campground
Facility Condition Assessment
Cabin T5
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 122
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 45/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $23,460
Record ID: 123

ATTACHMENT A

APPENDIX A

A202
Silver Lake Campground
Facility Condition Assessment
Cabin T6
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.437
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $48,988
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $22,341 $23,460 - - - -
B2050 EXTERIOR DOORS AND

GRILLES
$7,997 $8,400 - - - -
D5040 LIGHTING $1,202 $1,260 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
$48,988 $51,440 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$48,988
$51,440

ATTACHMENT A

APPENDIX A

A203
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin T6
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,640472
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 45 SF 1$7,990 $23,460473
B2050 - EXTERIOR

DOORS AND

GRILLES
B2050.10.001 Exterior wood entrance
door is approaching the
end of its useful life.

Replace wood door. 1 EA 1$2,860 $8,400478
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,260474
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $680475

ATTACHMENT A

APPENDIX A

A204
Silver Lake Campground
Facility Condition Assessment
Cabin T6
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 472
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 45/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $23,460
Record ID: 473
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 474

ATTACHMENT A

APPENDIX A

A205
Silver Lake Campground
Facility Condition Assessment
Cabin T6
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 475
PHOTO
NOT

APPLICABLE
Deficiency Description: Exterior wood entrance door is
approaching the end of its useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace wood door.

Item No.: B2050.10.001
Comments:

System: B2050 - EXTERIOR DOORS AND GRILLES
Total Deficiency Cost: $8,400
Record ID: 478

ATTACHMENT A

APPENDIX A

A206
Silver Lake Campground
Facility Condition Assessment
Cabin U1
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.510
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $57,152
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $22,341 $23,460 - - - -
B3010 ROOFING $7,354 $7,720 - - - -
D5020 ELECTRICAL SERVICE AND

DISTRIBUTION
$6,431 $6,750 - - - -
D5040 LIGHTING $3,579 $3,760 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
$57,152 $60,010 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$57,152
$60,010

ATTACHMENT A

APPENDIX A

A207
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin U1
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,640479
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 45 SF 1$7,990 $23,460480
B3010 - ROOFING B3010.10.007 Wood shake roof is past
its expected useful life.

Remove and replace
wood shake roof and
replace with metal
roofing.
200 SF 1$2,630 $7,720483
D5020 -

ELECTRICAL

SERVICE AND

DISTRIBUTION
D5020.30.9114 The outdoor load center
is past its expected
useful life.

Replace the existing
load center with a new
load center.
1 EA 1$2,300 $6,750222
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
1 EA 1$850 $2,500484
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,260481
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $680482

ATTACHMENT A

APPENDIX A

A208
Silver Lake Campground
Facility Condition Assessment
Cabin U1
PHOTO
NOT

APPLICABLE
Deficiency Description: The outdoor load center is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing load center with a new load center.

Item No.: D5020.30.9114
Comments:

System: D5020 - ELECTRICAL SERVICE AND

DISTRIBUTION
Total Deficiency Cost: $6,750
Record ID: 222
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 479
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 45/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $23,460
Record ID: 480

ATTACHMENT A

APPENDIX A

A209
Silver Lake Campground
Facility Condition Assessment
Cabin U1
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 481
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 482
PHOTO
NOT

APPLICABLE
Deficiency Description: Wood shake roof is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 200/SF
Description of Work: Remove and replace wood shake roof and replace with metal roofing.

Item No.: B3010.10.007
Comments:

System: B3010 - ROOFING
Total Deficiency Cost: $7,720
Record ID: 483

ATTACHMENT A

APPENDIX A

A210
Silver Lake Campground
Facility Condition Assessment
Cabin U1
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $2,500
Record ID: 484

ATTACHMENT A

APPENDIX A

A211
Silver Lake Campground
Facility Condition Assessment
Cabin U2
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.453
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $50,721
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $22,341 $23,460 - - - -
B3010 ROOFING $7,354 $7,720 - - - -
D5040 LIGHTING $3,579 $3,760 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
$50,721 $53,260 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$50,721
$53,260

ATTACHMENT A

APPENDIX A

A212
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin U2
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,640485
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 45 SF 1$7,990 $23,460486
B3010 - ROOFING B3010.10.007 Wood shake roof is past
its expected useful life.

Remove and replace
wood shake roof and
replace with metal
roofing.
200 SF 1$2,630 $7,720487
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
1 EA 1$850 $2,500488
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,260489
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $680490

ATTACHMENT A

APPENDIX A

A213
Silver Lake Campground
Facility Condition Assessment
Cabin U2
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 485
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 45/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $23,460
Record ID: 486
PHOTO
NOT

APPLICABLE
Deficiency Description: Wood shake roof is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 200/SF
Description of Work: Remove and replace wood shake roof and replace with metal roofing.

Item No.: B3010.10.007
Comments:

System: B3010 - ROOFING
Total Deficiency Cost: $7,720
Record ID: 487

ATTACHMENT A

APPENDIX A

A214
Silver Lake Campground
Facility Condition Assessment
Cabin U2
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $2,500
Record ID: 488
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 489
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 490

ATTACHMENT A

APPENDIX A

A215
Silver Lake Campground
Facility Condition Assessment
Cabin U3
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.453
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $50,721
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $22,341 $23,460 - - - -
B3010 ROOFING $7,354 $7,720 - - - -
D5040 LIGHTING $3,579 $3,760 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
$50,721 $53,260 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$50,721
$53,260

ATTACHMENT A

APPENDIX A

A216
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin U3
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,640491
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 45 SF 1$7,990 $23,460492
B3010 - ROOFING B3010.10.002 Metal Roofing is at or
approaching end of
expected useful service
life.

Remove and replace
metal roofing.
200 SF 1$2,630 $7,720498
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
1 EA 1$850 $2,500493
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,260496
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $680497

ATTACHMENT A

APPENDIX A

A217
Silver Lake Campground
Facility Condition Assessment
Cabin U3
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 491
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 45/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $23,460
Record ID: 492
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $2,500
Record ID: 493

ATTACHMENT A

APPENDIX A

A218
Silver Lake Campground
Facility Condition Assessment
Cabin U3
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 496
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 497
PHOTO
NOT

APPLICABLE
Deficiency Description: Metal Roofing is at or approaching end of expected useful service life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 200/SF
Description of Work: Remove and replace metal roofing.

Item No.: B3010.10.002
Comments:

System: B3010 - ROOFING
Total Deficiency Cost: $7,720
Record ID: 498

ATTACHMENT A

APPENDIX A

A219
Silver Lake Campground
Facility Condition Assessment
Cabin V1
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.386
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $43,256
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $14,875 $15,620 - - - -
B3010 ROOFING $7,354 $7,720 - - - -
D5040 LIGHTING $3,579 $3,760 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
$43,256 $45,420 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$43,256
$45,420

ATTACHMENT A

APPENDIX A

A220
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin V1
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,640499
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 30 SF 1$5,320 $15,620500
B3010 - ROOFING B3010.10.002 Metal Roofing is at or
approaching end of
expected useful service
life.

Remove and replace
metal roofing.
200 SF 1$2,630 $7,720215
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
1 EA 1$850 $2,500501
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,260502
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $680503

ATTACHMENT A

APPENDIX A

A221
Silver Lake Campground
Facility Condition Assessment
Cabin V1
PHOTO
NOT

APPLICABLE
Deficiency Description: Metal Roofing is at or approaching end of expected useful service life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 200/SF
Description of Work: Remove and replace metal roofing.

Item No.: B3010.10.002
Comments:

System: B3010 - ROOFING
Total Deficiency Cost: $7,720
Record ID: 215
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 499
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 30/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $15,620
Record ID: 500

ATTACHMENT A

APPENDIX A

A222
Silver Lake Campground
Facility Condition Assessment
Cabin V1
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $2,500
Record ID: 501
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 502
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 503

ATTACHMENT A

APPENDIX A

A223
Silver Lake Campground
Facility Condition Assessment
Cabin V2
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.386
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $43,256
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $14,875 $15,620 - - - -
B3010 ROOFING $7,354 $7,720 - - - -
D5040 LIGHTING $3,579 $3,760 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
$43,256 $45,420 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$43,256
$45,420

ATTACHMENT A

APPENDIX A

A224
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin V2
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,640506
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 30 SF 1$5,320 $15,620507
B3010 - ROOFING B3010.10.007 Wood shake roof is past
its expected useful life.

Remove and replace
wood shake roof and
replace with metal
roofing.
200 SF 1$2,630 $7,720505
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
1 EA 1$850 $2,500508
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,260509
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $680510

ATTACHMENT A

APPENDIX A

A225
Silver Lake Campground
Facility Condition Assessment
Cabin V2
PHOTO
NOT

APPLICABLE
Deficiency Description: Wood shake roof is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 200/SF
Description of Work: Remove and replace wood shake roof and replace with metal roofing.

Item No.: B3010.10.007
Comments:

System: B3010 - ROOFING
Total Deficiency Cost: $7,720
Record ID: 505
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 506
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 30/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $15,620
Record ID: 507

ATTACHMENT A

APPENDIX A

A226
Silver Lake Campground
Facility Condition Assessment
Cabin V2
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $2,500
Record ID: 508
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 509
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 510

ATTACHMENT A

APPENDIX A

A227
Silver Lake Campground
Facility Condition Assessment
Cabin V3
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.403
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $45,129
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $14,875 $15,620 - - - -
B2050 EXTERIOR DOORS AND

GRILLES
$7,997 $8,400 - - - -
D5040 LIGHTING $3,579 $3,760 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
G2030 PEDESTRIAN PLAZAS AND

WALKWAYS
$1,230 $1,290 - - - -
$45,129 $47,390 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$45,129
$47,390

ATTACHMENT A

APPENDIX A

A228
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin V3
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,640511
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 30 SF 1$5,320 $15,620512
B2050 - EXTERIOR

DOORS AND

GRILLES
B2050.10.001 Exterior wood entrance
door is approaching the
end of its useful life.

Replace wood door. 1 EA 1$2,860 $8,400516
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
1 EA 1$850 $2,500513
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,260514
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $680515
G2030 -

PEDESTRIAN

PLAZAS AND

WALKWAYS
G2030.30.038 Concrete steps are
showing signs of age
and wear.

Replace concrete steps. 2 LFN
S
1$440 $1,290517

ATTACHMENT A

APPENDIX A

A229
Silver Lake Campground
Facility Condition Assessment
Cabin V3
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 511
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 30/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $15,620
Record ID: 512
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $2,500
Record ID: 513

ATTACHMENT A

APPENDIX A

A230
Silver Lake Campground
Facility Condition Assessment
Cabin V3
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 514
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 515
PHOTO
NOT

APPLICABLE
Deficiency Description: Exterior wood entrance door is
approaching the end of its useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace wood door.

Item No.: B2050.10.001
Comments:

System: B2050 - EXTERIOR DOORS AND GRILLES
Total Deficiency Cost: $8,400
Record ID: 516

ATTACHMENT A

APPENDIX A

A231
Silver Lake Campground
Facility Condition Assessment
Cabin V3
PHOTO
NOT

APPLICABLE
Deficiency Description: Concrete steps are showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 2/LFNS
Description of Work: Replace concrete steps.

Item No.: G2030.30.038
Comments:

System: G2030 - PEDESTRIAN PLAZAS AND

WALKWAYS
Total Deficiency Cost: $1,290
Record ID: 517

ATTACHMENT A

APPENDIX A

A232
Silver Lake Campground
Facility Condition Assessment
Cabin W1
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.392
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $43,871
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $14,875 $15,620 - - - -
B3010 ROOFING $7,354 $7,720 - - - -
D5040 LIGHTING $3,579 $3,760 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
G2030 PEDESTRIAN PLAZAS AND

WALKWAYS
$615 $650 - - - -
$43,871 $46,070 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$43,871
$46,070

ATTACHMENT A

APPENDIX A

A233
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin W1
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,640518
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 30 SF 1$5,320 $15,620519
B3010 - ROOFING B3010.10.002 Metal Roofing is at or
approaching end of
expected useful service
life.

Remove and replace
metal roofing.
200 SF 1$2,630 $7,720521
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
1 EA 1$850 $2,500522
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,260523
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $680524
G2030 -

PEDESTRIAN

PLAZAS AND

WALKWAYS
G2030.30.038 Concrete steps are
showing signs of age
and wear.

Replace concrete steps. 1 LFN
S
1$220 $650520

ATTACHMENT A

APPENDIX A

A234
Silver Lake Campground
Facility Condition Assessment
Cabin W1
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 518
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 30/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $15,620
Record ID: 519
PHOTO
NOT

APPLICABLE
Deficiency Description: Concrete steps are showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/LFNS
Description of Work: Replace concrete steps.

Item No.: G2030.30.038
Comments:

System: G2030 - PEDESTRIAN PLAZAS AND

WALKWAYS
Total Deficiency Cost: $650
Record ID: 520

ATTACHMENT A

APPENDIX A

A235
Silver Lake Campground
Facility Condition Assessment
Cabin W1
PHOTO
NOT

APPLICABLE
Deficiency Description: Metal Roofing is at or approaching end of expected useful service life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 200/SF
Description of Work: Remove and replace metal roofing.

Item No.: B3010.10.002
Comments:

System: B3010 - ROOFING
Total Deficiency Cost: $7,720
Record ID: 521
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $2,500
Record ID: 522
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 523

ATTACHMENT A

APPENDIX A

A236
Silver Lake Campground
Facility Condition Assessment
Cabin W1
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 524

ATTACHMENT A

APPENDIX A

A237
Silver Lake Campground
Facility Condition Assessment
Cabin W2
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.386
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $43,256
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $14,875 $15,620 - - - -
B3010 ROOFING $7,354 $7,720 - - - -
D5040 LIGHTING $3,579 $3,760 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
$43,256 $45,420 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$43,256
$45,420

ATTACHMENT A

APPENDIX A

A238
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin W2
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,640525
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 30 SF 1$5,320 $15,620526
B3010 - ROOFING B3010.10.002 Metal Roofing is at or
approaching end of
expected useful service
life.

Remove and replace
metal roofing.
200 SF 1$2,630 $7,720527
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
1 EA 1$850 $2,500529
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,260530
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $680531

ATTACHMENT A

APPENDIX A

A239
Silver Lake Campground
Facility Condition Assessment
Cabin W2
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 525
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 30/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $15,620
Record ID: 526
PHOTO
NOT

APPLICABLE
Deficiency Description: Metal Roofing is at or approaching end of expected useful service life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 200/SF
Description of Work: Remove and replace metal roofing.

Item No.: B3010.10.002
Comments:

System: B3010 - ROOFING
Total Deficiency Cost: $7,720
Record ID: 527

ATTACHMENT A

APPENDIX A

A240
Silver Lake Campground
Facility Condition Assessment
Cabin W2
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $2,500
Record ID: 529
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 530
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 531

ATTACHMENT A

APPENDIX A

A241
Silver Lake Campground
Facility Condition Assessment
Cabin W3
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.386
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $43,256
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $14,875 $15,620 - - - -
B3010 ROOFING $7,354 $7,720 - - - -
D5040 LIGHTING $3,579 $3,760 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
$43,256 $45,420 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$43,256
$45,420

ATTACHMENT A

APPENDIX A

A242
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin W3
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,640532
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 30 SF 1$5,320 $15,620533
B3010 - ROOFING B3010.10.002 Metal Roofing is at or
approaching end of
expected useful service
life.

Remove and replace
metal roofing.
200 SF 1$2,630 $7,720534
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
1 EA 1$850 $2,500535
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,260536
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $680537

ATTACHMENT A

APPENDIX A

A243
Silver Lake Campground
Facility Condition Assessment
Cabin W3
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 532
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 30/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $15,620
Record ID: 533
PHOTO
NOT

APPLICABLE
Deficiency Description: Metal Roofing is at or approaching end of expected useful service life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 200/SF
Description of Work: Remove and replace metal roofing.

Item No.: B3010.10.002
Comments:

System: B3010 - ROOFING
Total Deficiency Cost: $7,720
Record ID: 534

ATTACHMENT A

APPENDIX A

A244
Silver Lake Campground
Facility Condition Assessment
Cabin W3
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $2,500
Record ID: 535
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 536
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 537

ATTACHMENT A

APPENDIX A

A245
Silver Lake Campground
Facility Condition Assessment
Cabin X
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.581
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $65,121
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
A4010 STANDARD SLABS-ON-
GRADE
$5,620 $5,900 - - - -
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $22,341 $23,460 - - - -
B3010 ROOFING $7,354 $7,720 - - - -
D5020 ELECTRICAL SERVICE AND

DISTRIBUTION
$6,431 $6,750 - - - -
D5040 LIGHTING $5,928 $6,220 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
$65,121 $68,370 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$65,121
$68,370

ATTACHMENT A

APPENDIX A

A246
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin X
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
A4010 - STANDARD

SLABS-ON-GRADE
A4010.10.003 The concrete floor slab
has major damage and
cracks from uplift.

Replace the concrete
slab.
150 SF 1$2,010 $5,900546
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,640540
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 45 SF 1$7,990 $23,460541
B3010 - ROOFING B3010.10.007 Wood shake roof is past
its expected useful life.

Remove and replace
wood shake roof and
replace with metal
roofing.
200 SF 1$2,630 $7,720545
D5020 -

ELECTRICAL

SERVICE AND

DISTRIBUTION
D5020.30.9114 The outdoor load center
is past its expected
useful life.

Replace the existing
load center with a new
load center.
1 EA 1$2,300 $6,750272
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
2 EA 1$1,690 $4,960542
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,260543
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $680544

ATTACHMENT A

APPENDIX A

A247
Silver Lake Campground
Facility Condition Assessment
Cabin X
PHOTO
NOT

APPLICABLE
Deficiency Description: The outdoor load center is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing load center with a new load center.

Item No.: D5020.30.9114
Comments:

System: D5020 - ELECTRICAL SERVICE AND

DISTRIBUTION
Total Deficiency Cost: $6,750
Record ID: 272
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 540
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 45/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $23,460
Record ID: 541

ATTACHMENT A

APPENDIX A

A248
Silver Lake Campground
Facility Condition Assessment
Cabin X
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 2/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $4,960
Record ID: 542
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 543
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 544

ATTACHMENT A

APPENDIX A

A249
Silver Lake Campground
Facility Condition Assessment
Cabin X
PHOTO
NOT

APPLICABLE
Deficiency Description: Wood shake roof is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 200/SF
Description of Work: Remove and replace wood shake roof and replace with metal roofing.

Item No.: B3010.10.007
Comments:

System: B3010 - ROOFING
Total Deficiency Cost: $7,720
Record ID: 545
PHOTO
NOT

APPLICABLE
Deficiency Description: The concrete floor slab has major damage and cracks from uplift.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 150/SF
Description of Work: Replace the concrete slab.

Item No.: A4010.10.003
Comments:

System: A4010 - STANDARD SLABS-ON-GRADE
Total Deficiency Cost: $5,900
Record ID: 546

ATTACHMENT A

APPENDIX A

A250
Silver Lake Campground
Facility Condition Assessment
Cabin Y1
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.457
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $51,225
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
A4010 STANDARD SLABS-ON-
GRADE
$5,620 $5,900 - - - -
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $14,875 $15,620 - - - -
B3010 ROOFING $7,354 $7,720 - - - -
D5040 LIGHTING $5,928 $6,220 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
$51,225 $53,780 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$51,225
$53,780

ATTACHMENT A

APPENDIX A

A251
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin Y1
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
A4010 - STANDARD

SLABS-ON-GRADE
A4010.10.003 The concrete floor slab
has major damage and
cracks from uplift.

Replace the concrete
slab.
150 SF 1$2,010 $5,900547
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,640548
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 30 SF 1$5,320 $15,620549
B3010 - ROOFING B3010.10.007 Wood shake roof is past
its expected useful life.

Remove and replace
wood shake roof and
replace with metal
roofing.
200 SF 1$2,630 $7,720550
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
2 EA 1$1,690 $4,960551
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,260552
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $680553

ATTACHMENT A

APPENDIX A

A252
Silver Lake Campground
Facility Condition Assessment
Cabin Y1
PHOTO
NOT

APPLICABLE
Deficiency Description: The concrete floor slab has major damage and cracks from uplift.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 150/SF
Description of Work: Replace the concrete slab.

Item No.: A4010.10.003
Comments:

System: A4010 - STANDARD SLABS-ON-GRADE
Total Deficiency Cost: $5,900
Record ID: 547
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 548
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 30/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $15,620
Record ID: 549

ATTACHMENT A

APPENDIX A

A253
Silver Lake Campground
Facility Condition Assessment
Cabin Y1
PHOTO
NOT

APPLICABLE
Deficiency Description: Wood shake roof is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 200/SF
Description of Work: Remove and replace wood shake roof and replace with metal roofing.

Item No.: B3010.10.007
Comments:

System: B3010 - ROOFING
Total Deficiency Cost: $7,720
Record ID: 550
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 2/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $4,960
Record ID: 551
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 552

ATTACHMENT A

APPENDIX A

A254
Silver Lake Campground
Facility Condition Assessment
Cabin Y1
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 553

ATTACHMENT A

APPENDIX A

A255
Silver Lake Campground
Facility Condition Assessment
Cabin Y2
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: C
FCI: 0.254
Condition Rating: POORReplacement Cost/SF: $747
Capital Renewal Cost: $28,464
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $7,438 $7,810 - - - -
D5040 LIGHTING $3,579 $3,760 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
$28,464 $29,890 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$28,464
$29,890

ATTACHMENT A

APPENDIX A

A256
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin Y2
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,640555
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 15 SF 1$2,660 $7,810556
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
1 EA 1$850 $2,500557
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,260560
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $680559

ATTACHMENT A

APPENDIX A

A257
Silver Lake Campground
Facility Condition Assessment
Cabin Y2
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 555
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 15/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $7,810
Record ID: 556
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $2,500
Record ID: 557

ATTACHMENT A

APPENDIX A

A258
Silver Lake Campground
Facility Condition Assessment
Cabin Y2
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 559
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 560

ATTACHMENT A

APPENDIX A

A259
Silver Lake Campground
Facility Condition Assessment
Cabin Z
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.453
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $50,749
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
A4010 STANDARD SLABS-ON-
GRADE
$5,620 $5,900 - - - -
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $14,875 $15,620 - - - -
B2050 EXTERIOR DOORS AND

GRILLES
$7,997 $8,400 - - - -
D5040 LIGHTING $3,579 $3,760 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
G2030 PEDESTRIAN PLAZAS AND

WALKWAYS
$1,230 $1,290 - - - -
$50,749 $53,290 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$50,749
$53,290

ATTACHMENT A

APPENDIX A

A260
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cabin Z
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
A4010 - STANDARD

SLABS-ON-GRADE
A4010.10.003 The concrete floor slab
has major damage and
cracks from uplift.

Replace the concrete
slab.
150 SF 1$2,010 $5,900566
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
700 SF 1$6,010 $17,640568
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 30 SF 1$5,320 $15,620563
B2050 - EXTERIOR

DOORS AND

GRILLES
B2050.10.001 Exterior wood entrance
door is approaching the
end of its useful life.

Replace wood door. 1 EA 1$2,860 $8,400561
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
1 EA 1$850 $2,500562
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,260564
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $680565
G2030 -

PEDESTRIAN

PLAZAS AND

WALKWAYS
G2030.30.038 Concrete steps are
showing signs of age
and wear.

Replace concrete steps. 2 LFN
S
1$440 $1,290569

ATTACHMENT A

APPENDIX A

A261
Silver Lake Campground
Facility Condition Assessment
Cabin Z
PHOTO
NOT

APPLICABLE
Deficiency Description: Exterior wood entrance door is
approaching the end of its useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace wood door.

Item No.: B2050.10.001
Comments:

System: B2050 - EXTERIOR DOORS AND GRILLES
Total Deficiency Cost: $8,400
Record ID: 561
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $2,500
Record ID: 562
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 30/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $15,620
Record ID: 563

ATTACHMENT A

APPENDIX A

A262
Silver Lake Campground
Facility Condition Assessment
Cabin Z
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 564
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 565
PHOTO
NOT

APPLICABLE
Deficiency Description: The concrete floor slab has major damage and cracks from uplift.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 150/SF
Description of Work: Replace the concrete slab.

Item No.: A4010.10.003
Comments:

System: A4010 - STANDARD SLABS-ON-GRADE
Total Deficiency Cost: $5,900
Record ID: 566

ATTACHMENT A

APPENDIX A

A263
Silver Lake Campground
Facility Condition Assessment
Cabin Z
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 568
PHOTO
NOT

APPLICABLE
Deficiency Description: Concrete steps are showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 2/LFNS
Description of Work: Replace concrete steps.

Item No.: G2030.30.038
Comments:

System: G2030 - PEDESTRIAN PLAZAS AND

WALKWAYS
Total Deficiency Cost: $1,290
Record ID: 569

ATTACHMENT A

APPENDIX A

A264
Silver Lake Campground
Facility Condition Assessment
Cook Shack (Ray)
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.354
Condition Rating: CRITICALReplacement Cost/SF: $747
Capital Renewal Cost: $39,593
Replacement Cost: $112,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $9,619 $10,100 - - - -
B2020 EXTERIOR WINDOWS $22,341 $23,460 - - - -
D5020 ELECTRICAL SERVICE AND

DISTRIBUTION
$6,431 $6,750 - - - -
D5040 LIGHTING $1,202 $1,260 - - - -
$39,593 $41,570 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$39,593
$41,570

ATTACHMENT A

APPENDIX A

A265
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Cook Shack (Ray)
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
400 SF 1$3,440 $10,100128
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 45 SF 1$7,990 $23,460129
D5020 -

ELECTRICAL

SERVICE AND

DISTRIBUTION
D5020.30.9114 The outdoor load center
is past its expected
useful life.

Replace the existing
load center with a new
load center.
1 EA 1$2,300 $6,750124
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,260126

ATTACHMENT A

APPENDIX A

A266
Silver Lake Campground
Facility Condition Assessment
Cook Shack (Ray)
PHOTO
NOT

APPLICABLE
Deficiency Description: The outdoor load center is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing load center with a new load center.

Item No.: D5020.30.9114
Comments:

System: D5020 - ELECTRICAL SERVICE AND

DISTRIBUTION
Total Deficiency Cost: $6,750
Record ID: 124
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 126
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 400/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments: Wood board siding is in poor condition.

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $10,100
Record ID: 128

ATTACHMENT A

APPENDIX A

A267
Silver Lake Campground
Facility Condition Assessment
Cook Shack (Ray)
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 45/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments: Windows missing.

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $23,460
Record ID: 129

ATTACHMENT A

APPENDIX A

A268
DETAILED REPORT | CRAFTS
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page F1 Y ear Built (approximate): Unknown
Total Building Area: 375 SF
Statistics
Address: 29981 Plasse Road, Pioneer, CA 95666
Crafts
Detailed Report
FCA Summary
Capital Renewal Cost: $75,299
FCI: 0.307
Condition Score: D
Condition Rating: Critical
Replacement Cost: $245,000
Replacement Cost/SF: $653

ATTACHMENT A

APPENDIX A

A269
Page F2
DETAILED REPORT | CRAFTS
CITY OF STOCKTON | FINAL REPORT
Architectural Systems
The Crafts cabin is an approximately 375 square foot
wood frame constructed structure on a concrete slab
foundation with a sloped metal roof. The exterior
painted wood board siding, windows and wall mounted
light fixtures are showing signs of damage, age, and
wear. The metal roof appears to be in fair condition
and within its expected useful life. The exterior door
has been boarded up and likely needs replacement.

The team was not able to fully access the structure to
assess the interior conditions, but it is assumed that
the interior finishes and equipment are in fair to poor condition and in need of replacement. It was noted that the cabin appears to be used to store various camp
equipment, including an electric or gas-powered golf
cart, a small generator, and canoe.

Mechanical Systems
Mechanical Systems
No mechanical systems were observed during the
assessment.

Plumbing Systems
No plumbing systems were observed during the
assessment.

Fire Protection Systems
No fire protection systems were observed during
the assessment; however, a fire extinguisher or wall
brackets for fire extinguishers were observed in the
cabin during the assessment.

Narratives
Electrical Systems
Electrical power is provided by an external wall load
center that is damaged. It is assumed that the cabin
includes a ceiling mounted light fixture in addition to the exterior wall mounted light fixture that are past
their expected useful life.

Fire Detection and Alarm Systems
Each room is equipped with a battery-operated ceiling
mounted smoke detector/alarm that appear past their
expected useful life and/or need battery replacement
and testing.

ATTACHMENT A

APPENDIX A

A270
DETAILED REPORT | CRAFTS
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page F3 Conclusion
For the Crafts cabin, these charts summarize the Capital Renewal Costs by Priority with their associated costs and escalation based on the time period anticipated for implementation. Detailed Capital Renewal Costs by Priority, broken down by Building System Class, are included in the following CIP Deficiency Cost Summaries.

This chart summarizes all of the more detailed information from the subsequent Deficiency Table. To supplement the Deficiency Table, representative photographs and descriptions are included.

Priority 1 Priorit y 2 Priorit y 3 Priorit y 4 Priorit y 5 8% Escalation 13% Escalation 18% Escalation 23% Escalation 28% Escalation Crafts $79,060 $0 $0 $0 $0 $79,060
Total $79,060 $0 $0 $0 $0 $79,060
100.00% 0.00% 0.00% 0.00% 0.00% 100.00%

Crafts
Capital Renewal Costs by Priority
TotalBuilding
Priority 1
$79,060

CAPITAL RENEWAL COSTS BY PRIORITY

ATTACHMENT A

APPENDIX A

A271
Page F4
DETAILED REPORT | CRAFTS
CITY OF STOCKTON | FINAL REPORT
This page intentionally left blank.

ATTACHMENT A

APPENDIX A

A272
Silver Lake Campground
Facility Condition Assessment
Crafts
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.307
Condition Rating: CRITICALReplacement Cost/SF: $653
Capital Renewal Cost: $75,299
Replacement Cost: $245,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $19,209 $20,170 - - - -
B2020 EXTERIOR WINDOWS $22,341 $23,460 - - - -
D5020 ELECTRICAL SERVICE AND

DISTRIBUTION
$6,431 $6,750 - - - -
D5040 LIGHTING $5,928 $6,220 - - - -
D7050 DETECTION AND ALARM $643 $680 - - - -
G2030 PEDESTRIAN PLAZAS AND

WALKWAYS
$20,747 $21,780 - - - -
$75,299 $79,060 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$75,299
$79,060

ATTACHMENT A

APPENDIX A

A273
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Crafts
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
800 SF 1$6,870 $20,170580
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 45 SF 1$7,990 $23,460581
D5020 -

ELECTRICAL

SERVICE AND

DISTRIBUTION
D5020.30.9114 The outdoor load center
is past its expected
useful life.

Replace the existing
load center with a new
load center.
1 EA 1$2,300 $6,750235
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
2 EA 1$1,690 $4,960582
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
1 EA 1$430 $1,260583
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
1 EA 1$230 $680584
G2030 -

PEDESTRIAN

PLAZAS AND

WALKWAYS
G2030.10.00 Concrete pavement has
major damage and
structural failure.

Repair and replace
concrete and base to
match existing.
600 SF 1$7,420 $21,780585

ATTACHMENT A

APPENDIX A

A274
Silver Lake Campground
Facility Condition Assessment
Crafts
PHOTO
NOT

APPLICABLE
Deficiency Description: The outdoor load center is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing load center with a new load center.

Item No.: D5020.30.9114
Comments:

System: D5020 - ELECTRICAL SERVICE AND

DISTRIBUTION
Total Deficiency Cost: $6,750
Record ID: 235
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 800/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $20,170
Record ID: 580
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 45/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $23,460
Record ID: 581

ATTACHMENT A

APPENDIX A

A275
Silver Lake Campground
Facility Condition Assessment
Crafts
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 2/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $4,960
Record ID: 582
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $1,260
Record ID: 583
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $680
Record ID: 584

ATTACHMENT A

APPENDIX A

A276
Silver Lake Campground
Facility Condition Assessment
Crafts
PHOTO
NOT

APPLICABLE
Deficiency Description: Concrete pavement has major damage and structural failure.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 600/SF
Description of Work: Repair and replace concrete and base to match existing.

Item No.: G2030.10.00
Comments:

System: G2030 - PEDESTRIAN PLAZAS AND

WALKWAYS
Total Deficiency Cost: $21,780
Record ID: 585

ATTACHMENT A

APPENDIX A

A277
DETAILED REPORT | ELECTRICAL
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page G1 Y ear Built (approximate): Unknown
Total Building Area: 200 SF
Statistics
Address: 29981 Plasse Road, Pioneer, CA 95666
Electrical
Detailed Report
FCA Summary
Capital Renewal Cost: $45,912
FCI: 0.131
Condition Score: C
Condition Rating: Poor
Replacement Cost: $350,000
Replacement Cost/SF: $1,750

ATTACHMENT A

APPENDIX A

A278
Page G2
DETAILED REPORT | ELECTRICAL
CITY OF STOCKTON | FINAL REPORT
Architectural Systems
The Electrical building is an approximately 200 square
foot masonry block structure with a sloped metal roof
on a concrete slab foundation. The double metal utility doors to allow for access to the interior are damaged
and showing signs of age and wear but are operable.

The interior provides space for a propane powered
generator. The metal roof appears to be in fair
condition and within its expected useful life.

Mechanical Systems
Mechanical Systems
No mechanical systems were observed during the
assessment.

Plumbing Systems
No plumbing systems were observed during the
assessment.

Fire Protection Systems
No fire protection systems were observed during
the assessment; however, a fire extinguisher or wall
brackets for fire extinguishers were observed in the
cabin during the assessment.

Narratives
Electrical Systems
Electrical power appears to be provided to the site
using a propane powered generator which is routed
through a 112.5 Kva transformer and disconnect. The
main panelboard and shutoff to the site is located in
the adjacent cabin, Pop’s Garage.

Fire Detection and Alarm Systems
No smoke detectors and alarms were observed during
the assessment.

ATTACHMENT A

APPENDIX A

A279
DETAILED REPORT | ELECTRICAL
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page G3 Conclusion
For the Electrical building, these charts summarize the Capital Renewal Costs by Priority with their associated costs and escalation based on the time period anticipated for implementation. Detailed Capital Renewal Costs by Priority, broken down by Building System Class, are included in the following CIP Deficiency Cost Summaries.

This chart summarizes all of the more detailed information from the subsequent Deficiency Table. To supplement the Deficiency Table, representative photographs and descriptions are included.

Priority 1 Priorit y 2 Priorit y 3 Priorit y 4 Priorit y 5 8% Escalation 13% Escalation 18% Escalation 23% Escalation 28% Escalation Electrical $48,210 $0 $0 $0 $0 $48,210
Total $48,210 $0 $0 $0 $0 $48,210
100.00% 0.00% 0.00% 0.00% 0.00% 100.00%

Electrical
Capital Renewal Costs by Priority
TotalBuilding
Priority 1
$48,210

CAPITAL RENEWAL COSTS BY PRIORITY

ATTACHMENT A

APPENDIX A

A280
Page G4
DETAILED REPORT | ELECTRICAL
CITY OF STOCKTON | FINAL REPORT
This page intentionally left blank.

ATTACHMENT A

APPENDIX A

A281
Silver Lake Campground
Facility Condition Assessment
Electrical
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: C
FCI: 0.131
Condition Rating: POORReplacement Cost/SF: $1,750
Capital Renewal Cost: $45,912
Replacement Cost: $350,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2050 EXTERIOR DOORS AND

GRILLES
$22,425 $23,550 - - - -
D5020 ELECTRICAL SERVICE AND

DISTRIBUTION
$21,083 $22,140 - - - -
D5040 LIGHTING $2,405 $2,520 - - - -
$45,912 $48,210 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$45,912
$48,210

ATTACHMENT A

APPENDIX A

A282
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Electrical
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2050 - EXTERIOR

DOORS AND

GRILLES
B2050.20.003 Exterior doors, frames
and hardware are
approaching the end of
their useful life.

Replace the exterior
doors, frames and
hardware.
2 EA 1$8,020 $23,550587
D5020 -

ELECTRICAL

SERVICE AND

DISTRIBUTION
D5020.10.218 The 112.5kVA
transformer (3P dry-
type, 480-120/208V) is
approaching the end of
its expected useful life.

Replace the existing
transformer with a new
transformer.
1 EA 1$7,540 $22,140315
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
2 EA 1$860 $2,520588

ATTACHMENT A

APPENDIX A

A283
Silver Lake Campground
Facility Condition Assessment
Electrical
PHOTO
NOT

APPLICABLE
Deficiency Description: The 112.5kVA transformer (3P dry-type, 480-120/208V) is approaching the end of
its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing transformer with a new transformer.

Item No.: D5020.10.218
Comments:

System: D5020 - ELECTRICAL SERVICE AND

DISTRIBUTION
Total Deficiency Cost: $22,140
Record ID: 315
PHOTO
NOT

APPLICABLE
Deficiency Description: Exterior doors, frames and hardware are approaching the end of their useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 2/EA
Description of Work: Replace the exterior doors, frames and hardware.

Item No.: B2050.20.003
Comments:

System: B2050 - EXTERIOR DOORS AND GRILLES
Total Deficiency Cost: $23,550
Record ID: 587
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 2/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $2,520
Record ID: 588

ATTACHMENT A

APPENDIX A

A284
DETAILED REPORT | KITCHEN
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page H1 Y ear Built (approximate): Unknown
Total Building Area: 1,600 SF
Statistics
Address: 29981 Plasse Road, Pioneer, CA 95666
Kitchen
Detailed Report
FCA Summary
Capital Renewal Cost: $157,141
FCI: 0.079
Condition Score: B
Condition Rating: Fair
Replacement Cost: $1,996,000
Replacement Cost/SF: $1,229

ATTACHMENT A

APPENDIX A

A285
Page H2
DETAILED REPORT | KITCHEN
CITY OF STOCKTON | FINAL REPORT
Architectural Systems
The Kitchen is an approximately 1,600 square
foot masonry block structure with a metal roof on
a concrete slab foundation. The exterior finish is
unpainted masonry block walls and some wood
board siding that is showing signs of age and wear.

The facility includes six doors and single pane wood
windows that are damaged and showing signs of wear
and age. The roof appears to be in fair condition and
within its expected useful life, but some of the vent
fittings appear to have been damaged. The interior
includes a storage area, main kitchen with a serving
window, and a dishwashing area. In general, the
interior finishes show signs of wear, but considering
the location and use, are functional. The Kitchen is
equipped with a walk-in cooler, gas stove/oven, hood,
sink, and a dishwashing station with commercial
dishwasher all of which appear to be past their
expected useful life.

Mechanical Systems
Mechanical Systems
The Kitchen is serviced by a gas fired stove and
oven with an exhaust hood and a walk-in cooler. The
Russel model AL26-72 walk-in cooler appears to be
past its expected useful life and is recommended for
replacement.

Narratives
Plumbing Systems
The plumbing system at the Kitchen is serviced by
a 100-gallon gas fired water heater that is well past
its expected useful life and is recommended for
replacement. In addition, the Kitchen is equipped
with a food preparation sink, dishwashing sink, and
a commercial dishwasher. The plumbing fixtures
appear to be in fair condition. The Kitchen grease
trap is located outside of the building adjacent to the restroom.

Fire Protection Systems
An ANSUL Kitchen Fire Suppression System serves
the cooking area. The system has approached the
end of its useful service life and is recommended for
replacement. Fire extinguishers were observed during
the assessment but do not appear to have been tested
recently. The fire extinguishers are recommended for
testing or replacement as necessary.

Electrical Systems
Electrical power appears to be provided through the
panelboard located in the Restroom building and
two panelboards in the Kitchen. Exterior and interior
light fixtures are showing signs of damage, wear and
appear past their expected useful life.

Fire Detection and Alarm Systems
No smoke detectors and alarms were observed during
the assessment.

ATTACHMENT A

APPENDIX A

A286
DETAILED REPORT | KITCHEN
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page H3 Conclusion
For the Kitchen building, these charts summarize the Capital Renewal Costs by Priority with their associated costs and escalation based on the time period anticipated for implementation. Detailed Capital Renewal Costs by Priority, broken down by Building System Class, are included in the following CIP Deficiency Cost Summaries.

This chart summarizes all of the more detailed information from the subsequent Deficiency Table. To supplement the Deficiency Table, representative photographs and descriptions are included.

Priority 1 Priorit y 2 Priorit y 3 Priorit y 4 Priorit y 5 8% Escalation 13% Escalation 18% Escalation 23% Escalation 28% Escalation Kitchen $165,010 $0 $0 $0 $0 $165,010
Total $165,010 $0 $0 $0 $0 $165,010
100.00% 0.00% 0.00% 0.00% 0.00% 100.00%

Kitchen
Capital Renewal Costs by Priority
TotalBuilding
Priority 1
$165,010

CAPITAL RENEWAL COSTS BY PRIORITY

ATTACHMENT A

APPENDIX A

A287
Page H4
DETAILED REPORT | KITCHEN
CITY OF STOCKTON | FINAL REPORT
This page intentionally left blank.

ATTACHMENT A

APPENDIX A

A288
Silver Lake Campground
Facility Condition Assessment
Kitchen
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: B
FCI: 0.079
Condition Rating: FAIRReplacement Cost/SF: $1,229
Capital Renewal Cost: $157,141
Replacement Cost: $1,996,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $11,995 $12,600 - - - -
B2020 EXTERIOR WINDOWS $49,631 $52,110 - - - -
B2050 EXTERIOR DOORS AND

GRILLES
$35,091 $36,850 - - - -
D2010 DOMESTIC WATER

DISTRIBUTION
$24,746 $25,980 - - - -
D4010 FIRE SUPPRESSION $2,572 $2,700 - - - -
D5020 ELECTRICAL SERVICE AND

DISTRIBUTION
$9,730 $10,220 - - - -
D5040 LIGHTING $16,665 $17,500 - - - -
E1030 COMMERCIAL

EQUIPMENT
$6,711 $7,050 - - - -
$157,141 $165,010 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$157,141
$165,010

ATTACHMENT A

APPENDIX A

A289
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Kitchen
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
500 SF 1$4,290 $12,600591
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 100 SF 1$17,750 $52,110592
B2050 - EXTERIOR

DOORS AND

GRILLES
B2050.10.006 Exterior aluminum
entrance door, frame
and hardware is
approaching the end of
its useful life.

Replace aluminum door,
frame, and hardware.
5 EA 1$12,550 $36,850589
D2010 - DOMESTIC
WATER

DISTRIBUTION
D2010.20.003 Gas fired water heater
more than 75 Gal is
approaching the end of
its expected useful life.

Provide equipment
replacement and
installation.
1 EA 1$8,850 $25,980325
D4010 - FIRE

SUPPRESSION
D4010.50.001 Ansul fire suppression
system with halon tank
and controller is
approaching the end of
its expected useful life.

Provide equipment
replacement and
installation.
100 cubic
-feet
of
natur
al
1$920 $2,700330
D5020 -

ELECTRICAL

SERVICE AND

DISTRIBUTION
D5020.30.4001 The 100A (18 ckts, 20A
plug-in breakers, 1P)
load center is
approaching the end of
its expected useful life.

Replace the existing
load center with a new
load center.
1 EA 1$1,740 $5,110328
D5020 -

ELECTRICAL

SERVICE AND

DISTRIBUTION
D5020.30.4001 The 100A (18 ckts, 20A
plug-in breakers, 1P)
load center is
approaching the end of
its expected useful life.

Replace the existing
load center with a new
load center.
1 EA 1$1,740 $5,110327
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
3 EA 1$2,540 $7,460590
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
8 EA 1$3,420 $10,040331
E1030 -

COMMERCIAL

EQUIPMENT
E1030.80.001 Walk-in cooler and
freezer are at or
approaching the end of
its expected useful
service life.

Provide equipment
replacement and
installation.
100 SF 1$2,400 $7,050329

ATTACHMENT A

APPENDIX A

A290
Silver Lake Campground
Facility Condition Assessment
Kitchen
PHOTO
NOT

APPLICABLE
Deficiency Description: Gas fired water heater more than 75 Gal is approaching the end of its expected useful
life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Provide equipment replacement and
installation.

Item No.: D2010.20.003
Comments:

System: D2010 - DOMESTIC WATER DISTRIBUTION
Total Deficiency Cost: $25,980
Record ID: 325
PHOTO
NOT

APPLICABLE
Deficiency Description: The 100A (18 ckts, 20A plug-in breakers, 1P) load center is approaching the end of
its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing load center with a new load center.

Item No.: D5020.30.4001
Comments:

System: D5020 - ELECTRICAL SERVICE AND

DISTRIBUTION
Total Deficiency Cost: $5,110
Record ID: 327
PHOTO
NOT

APPLICABLE
Deficiency Description: The 100A (18 ckts, 20A plug-in breakers, 1P) load center is approaching the end of
its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing load center with a new load center.

Item No.: D5020.30.4001
Comments:

System: D5020 - ELECTRICAL SERVICE AND

DISTRIBUTION
Total Deficiency Cost: $5,110
Record ID: 328

ATTACHMENT A

APPENDIX A

A291
Silver Lake Campground
Facility Condition Assessment
Kitchen
PHOTO
NOT

APPLICABLE
Deficiency Description: Walk-in cooler and freezer are at or approaching the end of its expected useful
service life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 100/SF
Description of Work: Provide equipment replacement and
installation.

Item No.: E1030.80.001
Comments:

System: E1030 - COMMERCIAL EQUIPMENT
Total Deficiency Cost: $7,050
Record ID: 329
PHOTO
NOT

APPLICABLE
Deficiency Description: Ansul fire suppression system with halon tank and controller is approaching the end
of its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 100/cubic-feet of natural gas Description of Work: Provide equipment replacement and
installation.

Item No.: D4010.50.001
Comments:

System: D4010 - FIRE SUPPRESSION
Total Deficiency Cost: $2,700
Record ID: 330
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 8/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $10,040
Record ID: 331

ATTACHMENT A

APPENDIX A

A292
Silver Lake Campground
Facility Condition Assessment
Kitchen
PHOTO
NOT

APPLICABLE
Deficiency Description: Exterior aluminum entrance door, frame and hardware is approaching the end of its
useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 5/EA
Description of Work: Replace aluminum door, frame, and
hardware.

Item No.: B2050.10.006
Comments:

System: B2050 - EXTERIOR DOORS AND GRILLES
Total Deficiency Cost: $36,850
Record ID: 589
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 3/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $7,460
Record ID: 590
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 500/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $12,600
Record ID: 591

ATTACHMENT A

APPENDIX A

A293
Silver Lake Campground
Facility Condition Assessment
Kitchen
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 100/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $52,110
Record ID: 592

ATTACHMENT A

APPENDIX A

A294
DETAILED REPORT | LODGE
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page I1 Y ear Built (approximate): Unknown
Total Building Area: 2,600 SF
Statistics
Address: 29981 Plasse Road, Pioneer, CA 95666
Lodge
Detailed Report
FCA Summary
Capital Renewal Cost: $256,179
FCI: 0.111
Condition Score: C
Condition Rating: Poor
Replacement Cost: $2,311,000
Replacement Cost/SF: $889

ATTACHMENT A

APPENDIX A

A295
Page I2
DETAILED REPORT | LODGE
CITY OF STOCKTON | FINAL REPORT
Architectural Systems
The Lodge is an approximately 2,600 square foot
timber structure with a metal roof on a concrete slab
foundation. The exterior wall veneer is painted timber
that is showing signs of age and wear. The structure
includes three wood double entrance doors and 10
single pane wood windows that appear to be in poor
condition. The roof appears to be in fair condition and within its expected useful life. Finally, the concrete and stone chimney appears to be in good condition and
is functional. The assessment team was not able to
access the interior due to snow blocking the entrance,
but reasonable assumptions regarding the condition of
the equipment are included in the deficiency costs.

Mechanical Systems
Mechanical Systems
No mechanical systems were observed during the
assessment.

Plumbing Systems
No plumbing systems were observed during the
assessment.

Fire Protection Systems
No fire protection systems were noted during the
assessment.

Narratives
Electrical Systems
The exterior light fixtures are showing signs of
damage, wear and appear past their expected useful
life.

Fire Detection and Alarm Systems
No smoke detectors and alarms were observed during
the assessment.

ATTACHMENT A

APPENDIX A

A296
DETAILED REPORT | LODGE
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page I3 Conclusion
For the Lodge, these charts summarize the Capital Renewal Costs by Priority with their associated costs and escalation based on the time period anticipated for implementation. Detailed Capital Renewal Costs by Priority, broken down by Building System Class, are included in the following CIP Deficiency Cost Summaries. This chart summarizes all of the more detailed information from the subsequent Deficiency Table. To supplement the Deficiency Table, representative photographs and descriptions are included.

Priority 1 Priorit y 2 Priorit y 3 Priorit y 4 Priorit y 5 8% Escalation 13% Escalation 18% Escalation 23% Escalation 28% Escalation Lodge $269,000 $0 $0 $0 $0 $269,000
Total $269,000 $0 $0 $0 $0 $269,000
100.00% 0.00% 0.00% 0.00% 0.00% 100.00%

Lodge
Capital Renewal Costs by Priority
TotalBuilding
Priority 1
$269,000

CAPITAL RENEWAL COSTS BY PRIORITY

ATTACHMENT A

APPENDIX A

A297
Page I4
DETAILED REPORT | LODGE
CITY OF STOCKTON | FINAL REPORT
This page intentionally left blank.

ATTACHMENT A

APPENDIX A

A298
Silver Lake Campground
Facility Condition Assessment
Lodge
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: C
FCI: 0.111
Condition Rating: POORReplacement Cost/SF: $889
Capital Renewal Cost: $256,179
Replacement Cost: $2,311,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $33,609 $35,290 - - - -
B2020 EXTERIOR WINDOWS $148,865 $156,310 - - - -
B2050 EXTERIOR DOORS AND

GRILLES
$48,037 $50,440 - - - -
D5040 LIGHTING $23,739 $24,930 - - - -
D7050 DETECTION AND ALARM $1,929 $2,030 - - - -
$256,179 $269,000 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$256,179
$269,000

ATTACHMENT A

APPENDIX A

A299
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Lodge
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding and/or wall finish
is showing signs of age
and wear.

Power wash and repaint
existing wood board
siding and/or wall finish.
1,400 SF 1$12,020 $35,290595
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 300 SF 1$53,240 $156,310597
B2050 - EXTERIOR

DOORS AND

GRILLES
B2050.10.001 Exterior wood entrance
door is damaged and/or
past its expected useful
life.

Replace wood door. 6 EA 1$17,180 $50,440596
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
7 EA 1$5,920 $17,380600
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
6 EA 1$2,570 $7,550601
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
3 EA 1$690 $2,030602

ATTACHMENT A

APPENDIX A

A300
Silver Lake Campground
Facility Condition Assessment
Lodge
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding and/or wall finish is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1,400/SF
Description of Work: Power wash and repaint existing wood board siding and/or wall finish.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $35,290
Record ID: 595
PHOTO
NOT

APPLICABLE
Deficiency Description: Exterior wood entrance door is damaged and/or past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 6/EA
Description of Work: Replace wood door.

Item No.: B2050.10.001
Comments:

System: B2050 - EXTERIOR DOORS AND GRILLES
Total Deficiency Cost: $50,440
Record ID: 596
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 300/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $156,310
Record ID: 597

ATTACHMENT A

APPENDIX A

A301
Silver Lake Campground
Facility Condition Assessment
Lodge
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 7/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $17,380
Record ID: 600
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 6/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments: Assumed based on site size of structure.

System: D5040 - LIGHTING
Total Deficiency Cost: $7,550
Record ID: 601
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 3/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments: Assumed based on site size of structure.

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $2,030
Record ID: 602

ATTACHMENT A

APPENDIX A

A302
DETAILED REPORT | MANAGER’S OFFICE
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page J1 Y ear Built (approximate): Unknown
Total Building Area: 900 SF
Statistics
Address: 29981 Plasse Road, Pioneer, CA 95666
Manager’s Office
Detailed Report
FCA Summary
Capital Renewal Cost: $127,335
FCI: 0.210
Condition Score: C
Condition Rating: Poor
Replacement Cost: $607,000
Replacement Cost/SF: $674

ATTACHMENT A

APPENDIX A

A303
Page J2
DETAILED REPORT | MANAGER’S OFFICE
CITY OF STOCKTON | FINAL REPORT
Architectural Systems
The Manager’s Office is an approximately 900 square
foot wood structure with a sloped metal roof on a
concrete slab foundation. The exterior wood board
siding and windows are showing signs of wear and
age. The sloped metal roof appears to be in fair
condition and within its expected useful life. The stone and concrete chimney also appears to be in good
condition.

The interior wall and ceiling veneer is both painted and unpainted plywood and a concrete floor. In general,
the interior finishes are showing signs of age and wear, but considering the location and use, are functional.

Mechanical Systems
Mechanical Systems
There is a gas fired wall furnace and exhaust fan that
are past their expected useful life.

Plumbing Systems
The Manager’s Office is serviced by a Camplux
instantaneous water heater that is likely past its
expected useful life and is recommended for
replacement.

Fire Protection Systems
Fire extinguishers were observed during the
assessment but do not appear to have been tested
recently.

Narratives
Electrical Systems
Electrical power is provided by an exterior wall-
mounted panelboard that seems to have been installed
recently.

Fire Detection and Alarm Systems
The battery powered smoke detectors are past their
expected useful life.

ATTACHMENT A

APPENDIX A

A304
DETAILED REPORT | MANAGER’S OFFICE
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page J3 Conclusion
For the Manager’s Office, these charts summarize the Capital Renewal Costs by Priority with their associated costs and escalation based on the time period anticipated for implementation. Detailed Capital Renewal Costs by Priority, broken down by Building System Class, are included in the following CIP Deficiency Cost Summaries.

This chart summarizes all of the more detailed information from the subsequent Deficiency Table. To supplement the Deficiency Table, representative photographs and descriptions are included.

Priority 1 Priorit y 2 Priorit y 3 Priorit y 4 Priorit y 5 8% Escalation 13% Escalation 18% Escalation 23% Escalation 28% Escalation Managers Office $133,690 $0 $0 $0 $0 $133,690
Total $133,690 $0 $0 $0 $0 $133,690
100.00% 0.00% 0.00% 0.00% 0.00% 100.00%

Managers Office
Capital Renewal Costs by Priority
TotalBuilding
Priority 1
$133,690

CAPITAL RENEWAL COSTS BY PRIORITY

ATTACHMENT A

APPENDIX A

A305
Page J4
DETAILED REPORT | MANAGER’S OFFICE
CITY OF STOCKTON | FINAL REPORT
This page intentionally left blank.

ATTACHMENT A

APPENDIX A

A306
Silver Lake Campground
Facility Condition Assessment
Managers Office
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: C
FCI: 0.210
Condition Rating: POORReplacement Cost/SF: $674
Capital Renewal Cost: $127,335
Replacement Cost: $607,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $36,014 $37,810 - - - -
B2020 EXTERIOR WINDOWS $66,995 $70,340 - - - -
D2010 DOMESTIC WATER

DISTRIBUTION
$6,403 $6,720 - - - -
D3020 HEATING SYSTEMS $3,523 $3,700 - - - -
D5040 LIGHTING $13,114 $13,770 - - - -
D7050 DETECTION AND ALARM $1,286 $1,350 - - - -
$127,335 $133,690 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$127,335
$133,690

ATTACHMENT A

APPENDIX A

A307
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Managers Office
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding is showing signs
of age and wear.

Power wash and repaint
existing wood board
siding.
1,500 SF 1$12,880 $37,810135
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 135 SF 1$23,960 $70,340136
D2010 - DOMESTIC
WATER

DISTRIBUTION
D2010.20.028 Tankless water heater is
past its expected useful
life.

Provide equipment
replacement and
installation.
1 EA 1$2,290 $6,72025
D3020 - HEATING

SYSTEMS
D3020.10.019 Gas-fired furnace 15
Mbh is past its expected
useful life.

Provide equipment
replacement and
installation.
1 EA 1$1,260 $3,70026
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
2 EA 1$1,690 $4,960130
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
7 EA 1$3,000 $8,81028
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
2 EA 1$460 $1,350131

ATTACHMENT A

APPENDIX A

A308
Silver Lake Campground
Facility Condition Assessment
Managers Office
PHOTO
NOT

APPLICABLE
Deficiency Description: Tankless water heater is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Provide equipment replacement and
installation.

Item No.: D2010.20.028
Comments:

System: D2010 - DOMESTIC WATER DISTRIBUTION
Total Deficiency Cost: $6,720
Record ID: 25
PHOTO
NOT

APPLICABLE
Deficiency Description: Gas-fired furnace 15 Mbh is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Provide equipment replacement and
installation.

Item No.: D3020.10.019
Comments:

System: D3020 - HEATING SYSTEMS
Total Deficiency Cost: $3,700
Record ID: 26
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 7/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $8,810
Record ID: 28

ATTACHMENT A

APPENDIX A

A309
Silver Lake Campground
Facility Condition Assessment
Managers Office
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 2/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $4,960
Record ID: 130
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 2/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $1,350
Record ID: 131
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1,500/SF
Description of Work: Power wash and repaint existing wood board siding.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $37,810
Record ID: 135

ATTACHMENT A

APPENDIX A

A310
Silver Lake Campground
Facility Condition Assessment
Managers Office
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 135/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $70,340
Record ID: 136

ATTACHMENT A

APPENDIX A

A311
DETAILED REPORT | NURSE
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page K1 Y ear Built (approximate): Unknown
Total Building Area: 650 SF
Statistics
Address: 29981 Plasse Road, Pioneer, CA 95666
Nurse
Detailed Report
FCA Summary
Capital Renewal Cost: $44,346
FCI: 0.101
Condition Score: C
Condition Rating: Poor
Replacement Cost: $438,000
Replacement Cost/SF: $674

ATTACHMENT A

APPENDIX A

A312
Page K2
DETAILED REPORT | NURSE
CITY OF STOCKTON | FINAL REPORT
Architectural Systems
The Nurse cabin is an approximately 650 square foot
wood structure with a sloped metal roof on a concrete
slab foundation. The exterior wall veneer is a painted
wood board siding, windows and doors are showing
signs of age and wear. The concrete and stone
chimney appears to be in good condition.

The interior wall and ceiling veneer are painted
plywood and an unfinished concrete floor. In general,
the interior finishes are showing signs of age and wear, but considering the location and use, are functional.

Moisture damage was noted on the gypsum wallboard
above the shower station.

The concrete foundation is showing signs of settlement
and cracking throughout. The main entrance door will
not fully open due to differential settlement between
the doorframe and floor slab.

Mechanical Systems
Mechanical Systems
A gas fired wall furnace and exhaust fan serve the
Nurse cabin. They are past their expected useful
service life and are recommended for replacement.

Plumbing Systems
The Nurse cabin includes a restroom with a shower
station, and lavatory. The plumbing fixtures appear
to be in operable condition, though they are past
their expected useful life and are recommended for
replacement.

Hot water is provided by a Camplux instantaneous
water heater that appears to be past its expected
useful life and recommended for replacement.

Narratives
In addition, the cabin includes wall mounted propane
powered lamps located throughout. It is unclear if the
lamps are still used or abandoned in place.

Fire Protection Systems
Fire extinguishers were observed during the
assessment but do not appear to have been tested
recently. They are recommended for testing or
replacement as necessary.

Electrical Systems
The interior and exterior light fixtures are showing
signs of damage, wear and are past their expected
useful life..

Fire Detection and Alarm Systems
The battery powered smoke detectors are past their
expected useful life.

ATTACHMENT A

APPENDIX A

A313
DETAILED REPORT | NURSE
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page K3 Conclusion
For the Nurse cabin, these charts summarize the Capital Renewal Costs by Priority with their associated costs and escalation based on the time period anticipated for implementation. Detailed Capital Renewal Costs by Priority, broken down by Building System Class, are included in the following CIP Deficiency Cost Summaries.

This chart summarizes all of the more detailed information from the subsequent Deficiency Table. To supplement the Deficiency Table, representative photographs and descriptions are included. .

Priority 1 Priorit y 2 Priorit y 3 Priorit y 4 Priorit y 5 8% Escalation 13% Escalation 18% Escalation 23% Escalation 28% Escalation Nurse $46,570 $0 $0 $0 $0 $46,570
Total $46,570 $0 $0 $0 $0 $46,570
100.00% 0.00% 0.00% 0.00% 0.00% 100.00%

Nurse
Capital Renewal Costs by Priority
TotalBuilding
Priority 1
$46,570

CAPITAL RENEWAL COSTS BY PRIORITY

ATTACHMENT A

APPENDIX A

A314
Page K4
DETAILED REPORT | NURSE
CITY OF STOCKTON | FINAL REPORT
This page intentionally left blank.

ATTACHMENT A

APPENDIX A

A315
Silver Lake Campground
Facility Condition Assessment
Nurse
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: C
FCI: 0.101
Condition Rating: POORReplacement Cost/SF: $674
Capital Renewal Cost: $44,346
Replacement Cost: $438,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $1,929 $2,030 - - - -
B2050 EXTERIOR DOORS AND

GRILLES
$7,997 $8,400 - - - -
C2010 WALL FINISHES $811 $850 - - - -
D2010 DOMESTIC WATER

DISTRIBUTION
$15,994 $16,790 - - - -
D3020 HEATING SYSTEMS $3,523 $3,700 - - - -
D5030 GENERAL PURPOSE

ELECTRICAL POWER
$252 $260 - - - -
D5040 LIGHTING $11,911 $12,510 - - - -
D7050 DETECTION AND ALARM $1,929 $2,030 - - - -
$44,346 $46,570 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$44,346
$46,570

ATTACHMENT A

APPENDIX A

A316
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Nurse
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding and/or wall finish
is showing signs of age
and wear.

Power wash and repaint
existing wood board
siding and/or wall finish.
80 SF 1$690 $2,030605
B2050 - EXTERIOR

DOORS AND

GRILLES
B2050.10.001 Exterior wood entrance
door is damaged and/or
past its expected useful
life.

Replace wood door. 1 EA 1$2,860 $8,400189
C2010 - WALL

FINISHES
C2010.70.001 Painted gypsum
wallboard is showing
signs of wear.

Patch and paint the
gypsum wallboard.
40 SF 1$290 $850609
D2010 - DOMESTIC
WATER

DISTRIBUTION
D2010.20.028 Tankless water heater is
past its expected useful
life.

Provide equipment
replacement and
installation.
1 EA 1$2,290 $6,720188
D2010 - DOMESTIC
WATER

DISTRIBUTION
D2010.60.004 Floor mounted, flush
tank water closet is
approaching the end of
its expected useful life.

Provide equipment
replacement and
installation.

EA 1614
D2010 - DOMESTIC
WATER

DISTRIBUTION
D2010.60.030 Porcelain sink is
approaching the end of
its expected useful life.

Provide equipment
replacement and
installation.
1 EA 1$2,860 $8,400626
D2010 - DOMESTIC
WATER

DISTRIBUTION
D2010.60.037 Shower station is at or
approaching the end of
its useful life.

Provide equipment
replacement and
installation.
1 EA 1$570 $1,670608
D3020 - HEATING

SYSTEMS
D3020.10.019 Gas-fired furnace 15
Mbh is past its expected
useful life.

Provide equipment
replacement and
installation.
1 EA 1$1,260 $3,700186
D5030 - GENERAL

PURPOSE

ELECTRICAL
POWER
D5030.50.010 A 20A duplex GFCI
receptacle, 120V,
grounded, should exist
in the place of a normal
receptacle neighboring
a sink.

Replace the existing
receptacle with a GFCI
receptacle.
1 EA 1$90 $260187
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
2 EA 1$1,690 $4,960606
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
6 EA 1$2,570 $7,550607
D7050 - DETECTION

AND ALARM
D7050.10.025 The smoke detector is
past its expected useful
life.

Replace the existing
smoke detector with a
new smoke detector.
3 EA 1$690 $2,030610

ATTACHMENT A

APPENDIX A

A317
Silver Lake Campground
Facility Condition Assessment
Nurse
PHOTO
NOT

APPLICABLE
Deficiency Description: Gas-fired furnace 15 Mbh is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Provide equipment replacement and
installation.

Item No.: D3020.10.019
Comments:

System: D3020 - HEATING SYSTEMS
Total Deficiency Cost: $3,700
Record ID: 186
PHOTO
NOT

APPLICABLE
Deficiency Description: A 20A duplex GFCI receptacle, 120V, grounded, should exist in the place of a
normal receptacle neighboring a sink.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing receptacle with a GFCI receptacle.

Item No.: D5030.50.010
Comments:

System: D5030 - GENERAL PURPOSE ELECTRICAL
POWER
Total Deficiency Cost: $260
Record ID: 187
PHOTO
NOT

APPLICABLE
Deficiency Description: Tankless water heater is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Provide equipment replacement and
installation.

Item No.: D2010.20.028
Comments:

System: D2010 - DOMESTIC WATER DISTRIBUTION
Total Deficiency Cost: $6,720
Record ID: 188

ATTACHMENT A

APPENDIX A

A318
Silver Lake Campground
Facility Condition Assessment
Nurse
PHOTO
NOT

APPLICABLE
Deficiency Description: Exterior wood entrance door is damaged and/or past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace wood door.

Item No.: B2050.10.001
Comments: Door does not fully open due to foundation
cracking and settlement.

System: B2050 - EXTERIOR DOORS AND GRILLES
Total Deficiency Cost: $8,400
Record ID: 189
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding and/or wall finish is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 80/SF
Description of Work: Power wash and repaint existing wood board siding and/or wall finish.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $2,030
Record ID: 605
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 2/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $4,960
Record ID: 606

ATTACHMENT A

APPENDIX A

A319
Silver Lake Campground
Facility Condition Assessment
Nurse
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 6/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $7,550
Record ID: 607
PHOTO
NOT

APPLICABLE
Deficiency Description: Shower station is at or approaching the end of its useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Provide equipment replacement and
installation.

Item No.: D2010.60.037
Comments:

System: D2010 - DOMESTIC WATER DISTRIBUTION
Total Deficiency Cost: $1,670
Record ID: 608
PHOTO
NOT

APPLICABLE
Deficiency Description: Painted gypsum wallboard is showing signs of wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 40/SF
Description of Work: Patch and paint the gypsum wallboard.

Item No.: C2010.70.001
Comments:

System: C2010 - WALL FINISHES
Total Deficiency Cost: $850
Record ID: 609

ATTACHMENT A

APPENDIX A

A320
Silver Lake Campground
Facility Condition Assessment
Nurse
PHOTO
NOT

APPLICABLE
Deficiency Description: The smoke detector is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 3/EA
Description of Work: Replace the existing smoke detector with a new smoke detector.

Item No.: D7050.10.025
Comments:

System: D7050 - DETECTION AND ALARM
Total Deficiency Cost: $2,030
Record ID: 610
PHOTO
NOT

APPLICABLE
Deficiency Description: Floor mounted, flush tank water closet is approaching the end of its expected useful
life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: /EA
Description of Work: Provide equipment replacement and
installation.

Item No.: D2010.60.004
Comments:

System: D2010 - DOMESTIC WATER DISTRIBUTION
Total Deficiency Cost:

Record ID: 614
PHOTO
NOT

APPLICABLE
Deficiency Description: Porcelain sink is approaching the end of its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Provide equipment replacement and
installation.

Item No.: D2010.60.030
Comments:

System: D2010 - DOMESTIC WATER DISTRIBUTION
Total Deficiency Cost: $8,400
Record ID: 626

ATTACHMENT A

APPENDIX A

A321
DETAILED REPORT | POP’S GARAGE
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page J1 Y ear Built (approximate): Unknown
Total Building Area: 250 SF
Statistics
Address: 29981 Plasse Road, Pioneer, CA 95666
Pop’s Garage
Detailed Report
FCA Summary
Capital Renewal Cost: $70,434
FCI: 0.377
Condition Score: D
Condition Rating: Critical
Replacement Cost: $187,000
Replacement Cost/SF: $748

ATTACHMENT A

APPENDIX A

A322
Page J2
DETAILED REPORT | POP’S GARAGE
CITY OF STOCKTON | FINAL REPORT
Architectural Systems
Pop’s Garage is an approximately 250 square foot
wood structure with a sloped wood shake roof on
a concrete slab foundation. The wood shake roof,
exterior painted wood board siding, single pane wood
windows and entrance door are showing signs of
damage, wear, and age. The interior is unfinished, with no wall coverings.

Mechanical Systems
Mechanical Systems
No mechanical systems were observed during the
assessment.

Plumbing Systems
No plumbing systems were observed during the
assessment.

Fire Protection Systems
No fire protection systems were observed during the
assessment.

Narratives
Electrical Systems
Electrical power is provided to the cabin from the
neighboring Electrical building through the site main
panelboard located in the cabin. The main panelboard
appears to be past its expected useful life.

The interior and exterior light fixtures are showing
signs of damage, wear and are past their expected
useful life.

Fire Detection and Alarm Systems
No smoke detection and alarm systems were observed
during the assessment.

ATTACHMENT A

APPENDIX A

A323
DETAILED REPORT | POP’S GARAGE
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page J3 Conclusion
For Pop’s Garage, these charts summarize the Capital Renewal Costs by Priority with their associated costs and escalation based on the time period anticipated for implementation. Detailed Capital Renewal Costs by Priority, broken down by Building System Class, are included in the following CIP Deficiency Cost Summaries. This chart summarizes all of the more detailed information from the subsequent Deficiency Table. To supplement the Deficiency Table, representative photographs and descriptions are included.

Priority 1 Priorit y 2 Priorit y 3 Priorit y 4 Priorit y 5 8% Escalation 13% Escalation 18% Escalation 23% Escalation 28% Escalation Pops Garage $73,960 $0 $0 $0 $0 $73,960
Total $73,960 $0 $0 $0 $0 $73,960
100.00% 0.00% 0.00% 0.00% 0.00% 100.00%

Pops Garage
Capital Renewal Costs by Priority
TotalBuilding
Priority 1
$73,960

CAPITAL RENEWAL COSTS BY PRIORITY

ATTACHMENT A

APPENDIX A

A324
Page J4
DETAILED REPORT | POP’S GARAGE
CITY OF STOCKTON | FINAL REPORT
This page intentionally left blank.

ATTACHMENT A

APPENDIX A

A325
Silver Lake Campground
Facility Condition Assessment
Pop's Garage
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: D
FCI: 0.377
Condition Rating: CRITICALReplacement Cost/SF: $748
Capital Renewal Cost: $70,434
Replacement Cost: $187,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $16,805 $17,640 - - - -
B2020 EXTERIOR WINDOWS $22,341 $23,460 - - - -
B2050 EXTERIOR DOORS AND

GRILLES
$7,997 $8,400 - - - -
D5020 ELECTRICAL SERVICE AND

DISTRIBUTION
$18,510 $19,440 - - - -
D5040 LIGHTING $4,781 $5,020 - - - -
$70,434 $73,960 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$70,434
$73,960

ATTACHMENT A

APPENDIX A

A326
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Pop's Garage
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding and/or wall finish
is showing signs of age
and wear.

Power wash and repaint
existing wood board
siding and/or wall finish.
700 SF 1$6,010 $17,640615
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 45 SF 1$7,990 $23,460616
B2050 - EXTERIOR

DOORS AND

GRILLES
B2050.10.001 Exterior wood entrance
door is damaged and/or
past its expected useful
life.

Replace wood door. 1 EA 1$2,860 $8,400617
D5020 -

ELECTRICAL

SERVICE AND

DISTRIBUTION
D5020.30.1008 The 225A (42 ckts,
120/208, 3P)
panelboard is
approaching the end of
its expected useful life.

Replace the existing
panelboard with a new
panelboard.
1 EA 1$6,620 $19,440313
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
1 EA 1$850 $2,500618
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing
incandescent fixtures
with LED fixtures.
2 EA 1$860 $2,520619

ATTACHMENT A

APPENDIX A

A327
Silver Lake Campground
Facility Condition Assessment
Pop's Garage
PHOTO
NOT

APPLICABLE
Deficiency Description: The 225A (42 ckts, 120/208, 3P) panelboard is approaching the end of its
expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing panelboard with a new panelboard.

Item No.: D5020.30.1008
Comments:

System: D5020 - ELECTRICAL SERVICE AND

DISTRIBUTION
Total Deficiency Cost: $19,440
Record ID: 313
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding and/or wall finish is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 700/SF
Description of Work: Power wash and repaint existing wood board siding and/or wall finish.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $17,640
Record ID: 615
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 45/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $23,460
Record ID: 616

ATTACHMENT A

APPENDIX A

A328
Silver Lake Campground
Facility Condition Assessment
Pop's Garage
PHOTO
NOT

APPLICABLE
Deficiency Description: Exterior wood entrance door is damaged and/or past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace wood door.

Item No.: B2050.10.001
Comments:

System: B2050 - EXTERIOR DOORS AND GRILLES
Total Deficiency Cost: $8,400
Record ID: 617
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $2,500
Record ID: 618
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 2/EA
Description of Work: Replace existing incandescent fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $2,520
Record ID: 619

ATTACHMENT A

APPENDIX A

A329
DETAILED REPORT | RESTROOM
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page M1 Y ear Built (approximate): Unknown
Total Building Area: 250 SF
Statistics
Address: 29981 Plasse Road, Pioneer, CA 95666
Restroom
Detailed Report
FCA Summary
Capital Renewal Cost: $74,768
FCI: 0.229
Condition Score: C
Condition Rating: Poor
Replacement Cost: $327,000
Replacement Cost/SF: $2,180

ATTACHMENT A

APPENDIX A

A330
Page M2
DETAILED REPORT | RESTROOM
CITY OF STOCKTON | FINAL REPORT
Architectural Systems
The Restroom building is an approximately 150 square
foot masonry block structure with a wood shake roof
on a concrete slab foundation. The exterior finishes are a combination of unpainted masonry block and painted
wood board siding. The painted wood board siding,
windows and doors are showing signs of damage, age,
and wear.

The interior finish is painted plywood ceiling, painted masonry block walls, and painted concrete floor. In
general, the interior finishes are showing signs of age and wear, but considering the location and use are
functional.

Mechanical Systems
Mechanical Systems
The restrooms are naturally ventilated, no mechanical
systems were observed during the assessment.

Plumbing Systems
The building includes a single floor mounted water
closet and a wall mounted lavatory in both the men’s
and women’s rooms. In addition, a wall mounted urinal
is provided in the men’s room. The plumbing fixtures
appear operable but are past their expected useful life.

Fire Protection Systems
No fire protection systems were observed during the
assessment.

Narratives
Electrical Systems
Electrical power is provided to the building through an exterior wall mounted load center that appears to be
past its expected useful life.

Fire Detection and Alarm Systems
No smoke detection and alarm systems were observed
during the assessment.

ATTACHMENT A

APPENDIX A

A331
DETAILED REPORT | RESTROOM
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page M3 Conclusion
For the Restroom building, these charts summarize the Capital Renewal Costs by Priority with their associated costs and escalation based on the time period anticipated for implementation. Detailed Capital Renewal Costs by Priority, broken down by Building System Class, are included in the following CIP Deficiency Cost Summaries.

This chart summarizes all of the more detailed information from the subsequent Deficiency Table. To supplement the Deficiency Table, representative photographs and descriptions are included.

Priority 1 Priorit y 2 Priorit y 3 Priorit y 4 Priorit y 5 8% Escalation 13% Escalation 18% Escalation 23% Escalation 28% Escalation Restroom $78,510 $0 $0 $0 $0 $78,510
Total $78,510 $0 $0 $0 $0 $78,510
100.00% 0.00% 0.00% 0.00% 0.00% 100.00%

Restroom
Capital Renewal Costs by Priority
TotalBuilding
Priority 1
$78,510

CAPITAL RENEWAL COSTS BY PRIORITY

ATTACHMENT A

APPENDIX A

A332
Page M4
DETAILED REPORT | RESTROOM
CITY OF STOCKTON | FINAL REPORT
This page intentionally left blank.

ATTACHMENT A

APPENDIX A

A333
Silver Lake Campground
Facility Condition Assessment
Restroom
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: C
FCI: 0.229
Condition Rating: POORReplacement Cost/SF: $2,180
Capital Renewal Cost: $74,768
Replacement Cost: $327,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $1,929 $2,030 - - - -
B2020 EXTERIOR WINDOWS $14,875 $15,620 - - - -
B2050 EXTERIOR DOORS AND

GRILLES
$15,994 $16,790 - - - -
B3010 ROOFING $3,691 $3,880 - - - -
D2010 DOMESTIC WATER

DISTRIBUTION
$16,469 $17,290 - - - -
D5020 ELECTRICAL SERVICE AND

DISTRIBUTION
$6,431 $6,750 - - - -
G3010 WATER UTILITIES $15,379 $16,150 - - - -
$74,768 $78,510 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$74,768
$78,510

ATTACHMENT A

APPENDIX A

A334
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Restroom
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding and/or wall finish
is showing signs of age
and wear.

Power wash and repaint
existing wood board
siding and/or wall finish.
80 SF 1$690 $2,030621
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 30 SF 1$5,320 $15,620625
B2050 - EXTERIOR

DOORS AND

GRILLES
B2050.10.001 Exterior wood entrance
door is damaged and/or
past its expected useful
life.

Replace wood door. 2 EA 1$5,720 $16,790622
B3010 - ROOFING B3010.10.007 Wood shake roof is past
its expected useful life.

Remove and replace
wood shake roof and
replace with metal
roofing.
100 SF 1$1,320 $3,880620
D2010 - DOMESTIC
WATER

DISTRIBUTION
D2010.60.004 Floor mounted, flush
tank water closet is
approaching the end of
its expected useful life.

Provide equipment
replacement and
installation.
2 EA 1$170 $500623
D2010 - DOMESTIC
WATER

DISTRIBUTION
D2010.60.030 Porcelain sink is
approaching the end of
its expected useful life.

Provide equipment
replacement and
installation.
2 EA 1$5,720 $16,790624
D5020 -

ELECTRICAL

SERVICE AND

DISTRIBUTION
D5020.30.9114 The outdoor load center
is past its expected
useful life.

Replace the existing
load center with a new
load center.
1 EA 1$2,300 $6,750261
G3010 - WATER

UTILITIES
G3010.10.004 Drinking fountain is past
its expected useful life.

Replace drinking
fountain.
1 EA 1$5,500 $16,150262

ATTACHMENT A

APPENDIX A

A335
Silver Lake Campground
Facility Condition Assessment
Restroom
PHOTO
NOT

APPLICABLE
Deficiency Description: The outdoor load center is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing load center with a new load center.

Item No.: D5020.30.9114
Comments:

System: D5020 - ELECTRICAL SERVICE AND

DISTRIBUTION
Total Deficiency Cost: $6,750
Record ID: 261
PHOTO
NOT

APPLICABLE
Deficiency Description: Drinking fountain is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace drinking fountain.

Item No.: G3010.10.004
Comments:

System: G3010 - WATER UTILITIES
Total Deficiency Cost: $16,150
Record ID: 262
PHOTO
NOT

APPLICABLE
Deficiency Description: Wood shake roof is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 100/SF
Description of Work: Remove and replace wood shake roof and replace with metal roofing.

Item No.: B3010.10.007
Comments:

System: B3010 - ROOFING
Total Deficiency Cost: $3,880
Record ID: 620

ATTACHMENT A

APPENDIX A

A336
Silver Lake Campground
Facility Condition Assessment
Restroom
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding and/or wall finish is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 80/SF
Description of Work: Power wash and repaint existing wood board siding and/or wall finish.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $2,030
Record ID: 621
PHOTO
NOT

APPLICABLE
Deficiency Description: Exterior wood entrance door is damaged and/or past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 2/EA
Description of Work: Replace wood door.

Item No.: B2050.10.001
Comments:

System: B2050 - EXTERIOR DOORS AND GRILLES
Total Deficiency Cost: $16,790
Record ID: 622
PHOTO
NOT

APPLICABLE
Deficiency Description: Floor mounted, flush tank water closet is approaching the end of its expected useful
life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 2/EA
Description of Work: Provide equipment replacement and
installation.

Item No.: D2010.60.004
Comments:

System: D2010 - DOMESTIC WATER DISTRIBUTION
Total Deficiency Cost: $500
Record ID: 623

ATTACHMENT A

APPENDIX A

A337
Silver Lake Campground
Facility Condition Assessment
Restroom
PHOTO
NOT

APPLICABLE
Deficiency Description: Porcelain sink is approaching the end of its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 2/EA
Description of Work: Provide equipment replacement and
installation.

Item No.: D2010.60.030
Comments:

System: D2010 - DOMESTIC WATER DISTRIBUTION
Total Deficiency Cost: $16,790
Record ID: 624
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 30/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $15,620
Record ID: 625

ATTACHMENT A

APPENDIX A

A338
DETAILED REPORT | RESTROOM AND SHOWERS
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page N1 Y ear Built (approximate): Unknown
Total Building Area: 2,000 SF
Statistics
Address: 29981 Plasse Road, Pioneer, CA 95666
Restroom and Showers
Detailed Report
FCA Summary
Capital Renewal Cost: $289,285
FCI: 0.075
Condition Score: B
Condition Rating: Fair
Replacement Cost: $3,874,000
Replacement Cost/SF: $1,937

ATTACHMENT A

APPENDIX A

A339
Page N2
DETAILED REPORT | RESTROOM AND SHOWERS
CITY OF STOCKTON | FINAL REPORT
Architectural Systems
The Restroom and Showers building is an
approximately 2,000 square foot, two-story masonry
block structure with a sloped metal roof on a concrete
foundation. The first floor includes a laundry room as
well as a men’s and women’s restroom and shower.

The second floor is accessed from a metal staircase
located on the north side of the building. The second
floor appears to be used as staff living quarters.

The exterior veneer of unpainted masonry block and
sloped metal roof appears to be in fair condition. The
exterior doors and windows appear functional but are
past their expected useful life.

Considering the location and function of the facility,
the interior finishes are in fair condition and are
functional. The second floor resilient tile floor and
casing is showing signs of damage, age, and wear.

Mechanical Systems
Mechanical Systems
The restrooms are naturally ventilated, no mechanical
systems were observed during the assessment.

Plumbing Systems
The building includes a gas fired water heater, storage tank, and pump located in the laundry room. The water
heater was manufactured in 2022 and is within its
expected useful life.

The women’s restroom includes four lavatories, four
floor mounted water closets and five shower stations.

The assessment team was not able to access the
men’s restroom during the assessment, but it is
assumed that the men’s restroom condition and
equipment is similar.

Narratives
Fire Protection Systems
No fire protection systems were observed during the
assessment.

Electrical Systems
Electrical power is provided to the building through the main panelboard in the laundry room. The panelboard
appears past its expected useful life. The interior and exterior lighting fixtures appear to be damaged and/or
past their expected useful life.

Fire Detection and Alarm Systems
No smoke detection and alarm systems were observed
during the assessment.

ATTACHMENT A

APPENDIX A

A340
DETAILED REPORT | RESTROOM AND SHOWERS
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page N3 Conclusion
For the Restroom and Showers building, these charts summarize the Capital Renewal Costs by Priority with their associated costs and escalation based on the time period anticipated for implementation. Detailed Capital Renewal Costs by Priority, broken down by Building System Class, are included in the following CIP Deficiency Cost Summaries. This chart summarizes all of the more detailed information from the subsequent Deficiency Table. To supplement the Deficiency Table, representative photographs and descriptions are included.

Priority 1 Priorit y 2 Priorit y 3 Priorit y 4 Priorit y 5 8% Escalation 13% Escalation 18% Escalation 23% Escalation 28% Escalation Restrooms and Showers $303,750 $0 $0 $0 $0 $303,750
Total $303,750 $0 $0 $0 $0 $303,750
100.00% 0.00% 0.00% 0.00% 0.00% 100.00%

Restrooms and Showers
Capital Renewal Costs by Priority
TotalBuilding
Priority 1
$303,750

CAPITAL RENEWAL COSTS BY PRIORITY

ATTACHMENT A

APPENDIX A

A341
Page N4
DETAILED REPORT | RESTROOM AND SHOWERS
CITY OF STOCKTON | FINAL REPORT
This page intentionally left blank.

ATTACHMENT A

APPENDIX A

A342
Silver Lake Campground
Facility Condition Assessment
Restrooms and Showers
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: B
FCI: 0.075
Condition Rating: FAIRReplacement Cost/SF: $1,937
Capital Renewal Cost: $289,285
Replacement Cost: $3,874,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2020 EXTERIOR WINDOWS $99,262 $104,220 - - - -
B2050 EXTERIOR DOORS AND

GRILLES
$33,609 $35,290 - - - -
C2030 FLOORING $16,217 $17,030 - - - -
D2010 DOMESTIC WATER

DISTRIBUTION
$105,469 $110,740 - - - -
D5040 LIGHTING $27,514 $28,900 - - - -
E2010 FIXED FURNISHINGS $7,214 $7,570 - - - -
$289,285 $303,750 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$289,285
$303,750

ATTACHMENT A

APPENDIX A

A343
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Restrooms and Showers
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 200 SF 1$35,500 $104,220635
B2050 - EXTERIOR

DOORS AND

GRILLES
B2050.20.003 Exterior doors, frames
and hardware are
approaching the end of
their useful life.

Replace the exterior
doors, frames and
hardware.
3 EA 1$12,020 $35,290636
C2030 - FLOORING C2030.50.001 Vinyl composition tile is approaching the end of
its useful life.

Remove the existing
vinyl composition tile
and replace.
675 SF 1$5,800 $17,030628
D2010 - DOMESTIC
WATER

DISTRIBUTION
D2010.10.001 Large domestic hot
water storage tank is
approaching the end of
its expected useful life.

Provide equipment
replacement and
installation.
1 EA 1$5,900 $17,320323
D2010 - DOMESTIC
WATER

DISTRIBUTION
D2010.60.006 Wall mounted, flush
tank water closet is
approaching the end of
its expected useful life.

Provide equipment
replacement and
installation.
4 EA 1$340 $1,000634
D2010 - DOMESTIC
WATER

DISTRIBUTION
D2010.60.027 Stainless steel sink with
bubbler are at or
approaching the end of
its expected useful
service life.

Provide equipment
replacement and
installation.
1 EA 1$2,860 $8,400629
D2010 - DOMESTIC
WATER

DISTRIBUTION
D2010.60.030 Porcelain sink is
approaching the end of
its expected useful life.

Provide equipment
replacement and
installation.
8 EA 1$22,900 $67,230632
D2010 - DOMESTIC
WATER

DISTRIBUTION
D2010.60.037 Shower station is at or
approaching the end of
its useful life.

Provide equipment
replacement and
installation.
10 EA 1$5,720 $16,790633
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
1 EA 1$850 $2,500637
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing fixtures
with LED fixtures.
14 EA 1$5,990 $17,590631
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing fixtures
with LED fixtures.
7 EA 1$3,000 $8,810627
E2010 - FIXED

FURNISHINGS
E2010.30.004 The existing casework is
at or is approaching the
end of its useful life.

Replace original wood
cabinets and
countertops.
5 LF 1$2,580 $7,570630

ATTACHMENT A

APPENDIX A

A344
Silver Lake Campground
Facility Condition Assessment
Restrooms and Showers
PHOTO
NOT

APPLICABLE
Deficiency Description: Large domestic hot water storage tank is approaching the end of its expected useful
life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Provide equipment replacement and
installation.

Item No.: D2010.10.001
Comments:

System: D2010 - DOMESTIC WATER DISTRIBUTION
Total Deficiency Cost: $17,320
Record ID: 323
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 7/EA
Description of Work: Replace existing fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $8,810
Record ID: 627
PHOTO
NOT

APPLICABLE
Deficiency Description: Vinyl composition tile is approaching the end of its useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 675/SF
Description of Work: Remove the existing vinyl composition tile and replace.

Item No.: C2030.50.001
Comments:

System: C2030 - FLOORING
Total Deficiency Cost: $17,030
Record ID: 628

ATTACHMENT A

APPENDIX A

A345
Silver Lake Campground
Facility Condition Assessment
Restrooms and Showers
PHOTO
NOT

APPLICABLE
Deficiency Description: Stainless steel sink with bubbler are at or approaching the end of its expected useful
service life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Provide equipment replacement and
installation.

Item No.: D2010.60.027
Comments:

System: D2010 - DOMESTIC WATER DISTRIBUTION
Total Deficiency Cost: $8,400
Record ID: 629
PHOTO
NOT

APPLICABLE
Deficiency Description: The existing casework is at or is approaching the end of its useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 5/LF
Description of Work: Replace original wood cabinets and countertops.

Item No.: E2010.30.004
Comments:

System: E2010 - FIXED FURNISHINGS
Total Deficiency Cost: $7,570
Record ID: 630
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 14/EA
Description of Work: Replace existing fixtures with LED fixtures.

Item No.: D5040.50.421
Comments: Includes assumed quantities for Men's
Restroom.

System: D5040 - LIGHTING
Total Deficiency Cost: $17,590
Record ID: 631

ATTACHMENT A

APPENDIX A

A346
Silver Lake Campground
Facility Condition Assessment
Restrooms and Showers
PHOTO
NOT

APPLICABLE
Deficiency Description: Porcelain sink is approaching the end of its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 8/EA
Description of Work: Provide equipment replacement and
installation.

Item No.: D2010.60.030
Comments: Includes assumed quantities for Men's
Restroom.

System: D2010 - DOMESTIC WATER DISTRIBUTION
Total Deficiency Cost: $67,230
Record ID: 632
PHOTO
NOT

APPLICABLE
Deficiency Description: Shower station is at or approaching the end of its useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 10/EA
Description of Work: Provide equipment replacement and
installation.

Item No.: D2010.60.037
Comments: Includes assumed quantities for Men's
Restroom.

System: D2010 - DOMESTIC WATER DISTRIBUTION
Total Deficiency Cost: $16,790
Record ID: 633
PHOTO
NOT

APPLICABLE
Deficiency Description: Wall mounted, flush tank water closet is approaching the end of its expected useful
life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 4/EA
Description of Work: Provide equipment replacement and
installation.

Item No.: D2010.60.006
Comments: Includes assumed quantities for Men's
Restroom.

System: D2010 - DOMESTIC WATER DISTRIBUTION
Total Deficiency Cost: $1,000
Record ID: 634

ATTACHMENT A

APPENDIX A

A347
Silver Lake Campground
Facility Condition Assessment
Restrooms and Showers
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 200/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments: Includes second floor windows.

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $104,220
Record ID: 635
PHOTO
NOT

APPLICABLE
Deficiency Description: Exterior doors, frames and hardware are approaching the end of their useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 3/EA
Description of Work: Replace the exterior doors, frames and hardware.

Item No.: B2050.20.003
Comments:

System: B2050 - EXTERIOR DOORS AND GRILLES
Total Deficiency Cost: $35,290
Record ID: 636
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $2,500
Record ID: 637

ATTACHMENT A

APPENDIX A

A348
DETAILED REPORT | REYNOLD’S MEMORIAL MUSEUM
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page O1 Y ear Built (approximate): Unknown
Total Building Area: 1,200 SF
Statistics
Address: 29981 Plasse Road, Pioneer, CA 95666
Reynold’s Memorial Museum
Detailed Report
FCA Summary
Capital Renewal Cost: $78,011
FCI: 0.073
Condition Score: B
Condition Rating: Fair
Replacement Cost: $1,067,000
Replacement Cost/SF: $889

ATTACHMENT A

APPENDIX A

A349
Page O2
DETAILED REPORT | REYNOLD’S MEMORIAL MUSEUM
CITY OF STOCKTON | FINAL REPORT
Architectural Systems
The Reynold’s Memorial Museum is an approximately
1,200 square foot timber structure with a wood shake
roof on a concrete foundation.

The single wood
entrance door and five single pane wood windows are
showing signs of deterioration, age, wear and are past
their expected useful life.

T
he team was unable to access the building to assess
the interior finishes.

It was noted during the assessment that the exterior
wall along the north side of the building is showing
structural damage. It was noted that the wall appears
to be separating from the roof peak and leaning
outward. The front of the building is braced with a
metal structure to prevent the wall from falling forward.

It is recommended that a structural engineer provide a
full assessment of the structure.

Mechanical Systems
Mechanical Systems
No mechanical systems were observed during the
assessment.

Plumbing Systems
No plumbing systems were observed during the
assessment.

Fire Protection Systems
No fire protection systems were observed during the
assessment.

Narratives
Electrical Systems
Electrical power appears to be provided by a buried
PVC conduit that runs along the unimproved trail. It
was noted that an exposed section of the conduit on
the north side of the building was damaged.

The single exterior wall mounted light fixture appears
to be past its expected useful life. The team was
unable to access the interior of the building.

Fire Detection and Alarm Systems
No smoke detection and alarm systems were observed
during the assessment.

ATTACHMENT A

APPENDIX A

A350
DETAILED REPORT | REYNOLD’S MEMORIAL MUSEUM
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page O3 Conclusion
For the Reynold’s Memorial Museum, these charts summarize the Capital Renewal Costs by Priority with their associated costs and escalation based on the time period anticipated for implementation. Detailed Capital Renewal Costs by Priority, broken down by Building System Class, are included in the following CIP Deficiency Cost Summaries. This chart summarizes all of the more detailed information from the subsequent Deficiency Table. To supplement the Deficiency Table, representative photographs and descriptions are included.

Priority 1 Priorit y 2 Priorit y 3 Priorit y 4 Priorit y 5 8% Escalation 13% Escalation 18% Escalation 23% Escalation 28% Escalation Reynolds Memorial Museum $81,920 $0 $0 $0 $0 $81,920
Total $81,920 $0 $0 $0 $0 $81,920
100.00% 0.00% 0.00% 0.00% 0.00% 100.00%

Reynolds Memorial Museum
Capital Renewal Costs by Priority
TotalBuilding
Priority 1
$81,920

CAPITAL RENEWAL COSTS BY PRIORITY

ATTACHMENT A

APPENDIX A

A351
Page O4
DETAILED REPORT | REYNOLD’S MEMORIAL MUSEUM
CITY OF STOCKTON | FINAL REPORT
This page intentionally left blank.

ATTACHMENT A

APPENDIX A

A352
Silver Lake Campground
Facility Condition Assessment
Reynolds Memorial Museum
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: B
FCI: 0.073
Condition Rating: FAIRReplacement Cost/SF: $889
Capital Renewal Cost: $78,011
Replacement Cost: $1,067,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $33,609 $35,290 - - - -
B2020 EXTERIOR WINDOWS $37,216 $39,080 - - - -
B2050 EXTERIOR DOORS AND

GRILLES
$4,809 $5,050 - - - -
D5040 LIGHTING $2,377 $2,500 - - - -
$78,011 $81,920 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$78,011
$81,920

ATTACHMENT A

APPENDIX A

A353
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Reynolds Memorial Museum
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.017 The exterior timber walls
are showing signs of
age, deteroation and
wear.

Power wash and refinish
timber walls.
1,400 SF 1$12,020 $35,290642
B2020 - EXTERIOR

WINDOWS
B2020.10.015 Windows are damaged
and/or past their
expected useful life.

Replace window. 75 SF 1$13,310 $39,080639
B2050 - EXTERIOR

DOORS AND

GRILLES
B2050.10.005 Exterior wood entrance
door, frame and
hardware is
approaching the end of
its useful life.

Replace wood door,
frame, and hardware.
1 EA 1$1,720 $5,050640
B3010 - ROOFING B3010.10.007 Wood shake roof is past
its expected useful life.

Remove and replace
wood shake roof and
replace with metal
roofing.

SF 1643
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
1 EA 1$850 $2,500641

ATTACHMENT A

APPENDIX A

A354
Silver Lake Campground
Facility Condition Assessment
Reynolds Memorial Museum
PHOTO
NOT

APPLICABLE
Deficiency Description: Windows are damaged and/or past their expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 75/SF
Description of Work: Replace window.

Item No.: B2020.10.015
Comments:

System: B2020 - EXTERIOR WINDOWS
Total Deficiency Cost: $39,080
Record ID: 639
PHOTO
NOT

APPLICABLE
Deficiency Description: Exterior wood entrance door, frame and hardware is approaching the end of its
useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace wood door, frame, and hardware.

Item No.: B2050.10.005
Comments:

System: B2050 - EXTERIOR DOORS AND GRILLES
Total Deficiency Cost: $5,050
Record ID: 640
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $2,500
Record ID: 641

ATTACHMENT A

APPENDIX A

A355
Silver Lake Campground
Facility Condition Assessment
Reynolds Memorial Museum
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior timber walls are showing signs of age, deteroation and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1,400/SF
Description of Work: Power wash and refinish timber walls.

Item No.: B2010.10.017
Comments: Severe structural damage noted on the
front wall. The wall appears to have
separated from the roof near the roof peak.

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $35,290
Record ID: 642
PHOTO
NOT

APPLICABLE
Deficiency Description: Wood shake roof is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: /SF
Description of Work: Remove and replace wood shake roof and replace with metal roofing.

Item No.: B3010.10.007
Comments:

System: B3010 - ROOFING
Total Deficiency Cost:

Record ID: 643

ATTACHMENT A

APPENDIX A

A356
DETAILED REPORT | STORAGE 1
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page P1 Y ear Built (approximate): Unknown
Total Building Area: 1,100 SF
Statistics
Address: 29981 Plasse Road, Pioneer, CA 95666
Storage 1
Detailed Report
FCA Summary
Capital Renewal Cost: $83,911
FCI: 0.242
Condition Score: C
Condition Rating: Poor
Replacement Cost: $347,000
Replacement Cost/SF: $315

ATTACHMENT A

APPENDIX A

A357
Page P2
DETAILED REPORT | STORAGE 1
CITY OF STOCKTON | FINAL REPORT
Architectural Systems
Storage 1 is an approximately 1,100 square foot
wood structure with a metal roof on a concrete
foundation.

The building is accessed by three sliding
barn style doors that are damaged and showing signs
of wear and age. The exterior wood board siding
is showing signs of damage, age, and wear. The
interior is unfinished and considering the location and intended use is functional.

Mechanical Systems
Mechanical Systems
No mechanical systems were observed during the
assessment.

Plumbing Systems
No plumbing systems were observed during the
assessment.

Fire Protection Systems
No fire protection systems were observed during the
assessment.

Narratives
Electrical Systems
Electrical power appears to be provided by the main
panelboard located in Pop’s Garage.

The exterior wall mounted and interior ceiling mounted
light fixtures are damaged and/or past their expected
useful life.

Fire Detection and Alarm Systems
No smoke detection and alarm systems were observed
during the assessment.

ATTACHMENT A

APPENDIX A

A358
DETAILED REPORT | STORAGE 1
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page P3 Conclusion
For the Storage 1 building, these charts summarize the Capital Renewal Costs by Priority with their associated costs and escalation based on the time period anticipated for implementation. Detailed Capital Renewal Costs by Priority, broken down by Building System Class, are included in the following CIP Deficiency Cost Summaries.

This chart summarizes all of the more detailed information from the subsequent Deficiency Table. To supplement the Deficiency Table, representative photographs and descriptions are included.

Priority 1 Priorit y 2 Priorit y 3 Priorit y 4 Priorit y 5 8% Escalation 13% Escalation 18% Escalation 23% Escalation 28% Escalation Storage 1 $1,703,420 $0 $0 $0 $0 $1,703,420
Total $1,703,420 $0 $0 $0 $0 $1,703,420
100.00% 0.00% 0.00% 0.00% 0.00% 100.00%

Storage 1
Capital Renewal Costs by Priority
TotalBuilding
Priority 1
$1,703,420

CAPITAL RENEWAL COSTS BY PRIORITY

ATTACHMENT A

APPENDIX A

A359
Page P4
DETAILED REPORT | STORAGE 1
CITY OF STOCKTON | FINAL REPORT
This page intentionally left blank.

ATTACHMENT A

APPENDIX A

A360
Silver Lake Campground
Facility Condition Assessment
Storage 1
Building System
Class
Current
Costs

CIP DEFICIENCY COST SUMMARY
Uniformat
Code
Construction Increase - Cumulative Escalation
5%
Priority 1 Priority 2
Condition Score: C
FCI: 0.242
Condition Rating: POORReplacement Cost/SF: $315
Capital Renewal Cost: $83,911
Replacement Cost: $347,000
10% 15% 20% 25%
(0-12 Months) (1-2 Years)
Priority 3
(2-3 Years)
Priority 4
(3-4 Years)
Priority 5
(4-5 Years)
B2010 EXTERIOR WALLS $36,014 $37,810 - - - -
B2050 EXTERIOR DOORS AND

GRILLES
$33,609 $35,290 - - - -
D5040 LIGHTING $14,288 $15,010 - - - -
$83,911 $88,110 - - - -TOTALS
TOTAL
(Priority 1-6
without escalation) TOTAL
(Priority 1-6 with escalation)
$83,911
$88,110

ATTACHMENT A

APPENDIX A

A361
Deficiency Description Description of Work Qty Unit Total Deficiency
Cost (2)
Deficiency
Cost
(1)
System Item No.

Silver Lake Campground
Facility Condition Assessment
Storage 1
(1) Deficiency Cost = Qty x Unit Cost
(2) Total Deficiency Cost = (Deficiency Cost) x (General Construction Factor) x (City Cost Index) x (Non Construction Cost) x [Estimating Contingency] x (Escalation) General Construction Factor [1.5] = General Conditions, Overhead and Profit, Insurance, Bonds and Remote Location.

City Cost Index [1.103] = A Compensation for Cost Variation per Geographical Location - Sacramento Non Construction Cost [1.3] = Includes Architect/Engineer Fees, Construction Management, Client Administration, Permits, Testing, etc.

Estimating Contingency [1.3] = Anticipates fluctuation in manufacturer pricing, market costs, special owner administration costs, and project specific unknowns

DEFICIENCY TABLE
PriorityRecord ID
B2010 - EXTERIOR
WALLS
B2010.10.016 The exterior wood board
siding and/or wall finish
is showing signs of age
and wear.

Power wash and repaint
existing wood board
siding and/or wall finish.
1,500 SF 1$12,880 $37,810644
B2050 - EXTERIOR

DOORS AND

GRILLES
B2050.20.003 Exterior doors, frames
and hardware are
approaching the end of
their useful life.

Replace the exterior
doors, frames and
hardware.
3 EA 1$12,020 $35,290648
D5040 - LIGHTING D5040.50.420 The exterior wall
mounted fixture is past
its expected useful life.

Replace the existing
wall mounted lighting
fixture with an LED
lighting fixture.
3 EA 1$2,540 $7,460645
D5040 - LIGHTING D5040.50.421 The light fixture is past its expected useful life.

Replace existing fixtures
with LED fixtures.
6 EA 1$2,570 $7,550647

ATTACHMENT A

APPENDIX A

A362
Silver Lake Campground
Facility Condition Assessment
Storage 1
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wood board siding and/or wall finish is showing signs of age and wear.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 1,500/SF
Description of Work: Power wash and repaint existing wood board siding and/or wall finish.

Item No.: B2010.10.016
Comments:

System: B2010 - EXTERIOR WALLS
Total Deficiency Cost: $37,810
Record ID: 644
PHOTO
NOT

APPLICABLE
Deficiency Description: The exterior wall mounted fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 3/EA
Description of Work: Replace the existing wall mounted lighting fixture with an LED lighting fixture.

Item No.: D5040.50.420
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $7,460
Record ID: 645
PHOTO
NOT

APPLICABLE
Deficiency Description: The light fixture is past its expected useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 6/EA
Description of Work: Replace existing fixtures with LED fixtures.

Item No.: D5040.50.421
Comments:

System: D5040 - LIGHTING
Total Deficiency Cost: $7,550
Record ID: 647

ATTACHMENT A

APPENDIX A

A363
Silver Lake Campground
Facility Condition Assessment
Storage 1
PHOTO
NOT

APPLICABLE
Deficiency Description: Exterior doors, frames and hardware are approaching the end of their useful life.

Priority: Immediate (0-1 Years)
Quantity/Unit of Measure: 3/EA
Description of Work: Replace the exterior doors, frames and hardware.

Item No.: B2050.20.003
Comments:

System: B2050 - EXTERIOR DOORS AND GRILLES
Total Deficiency Cost: $35,290
Record ID: 648

ATTACHMENT A

APPENDIX A

A364
DETAILED REPORT | STORAGE 2
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page Q1 Y ear Built (approximate): Unknown
Total Building Area: 150 SF
Statistics
Address: 29981 Plasse Road, Pioneer, CA 95666
Storage 2
Detailed Report
FCA Summary
Capital Renewal Cost: $69,000
FCI: 1.00
Condition Score: D
Condition Rating: Critical
Replacement Cost: $69,000
Replacement Cost/SF: $460

ATTACHMENT A

APPENDIX A

A365
Page Q2
DETAILED REPORT | STORAGE 2
CITY OF STOCKTON | FINAL REPORT
Architectural Systems
Storage 2 is an approximately 150 square foot wood
structure with a metal roof on a concrete foundation.

The structure is showing signs of structural damage
due to the concrete foundation failure. The structure
appeared to be leaning downslope and the access
door could not be fully opened to allow entrance.

A full demolition and replacement of the Storage 2
building is recommended.

Mechanical Systems
Mechanical Systems
No mechanical systems were observed during the
assessment.

Plumbing Systems
No plumbing systems were observed during the
assessment.

Fire Protection Systems
No fire protection systems were observed during the
assessment.

Narratives
Electrical Systems
Electrical power appears to be provided from the load
center at the Kitchen.

No exterior wall mounted light fixtures were noted
during the assessment. It is assumed that the interior
included a ceiling mounted light fixture.

Fire Detection and Alarm Systems
No smoke detection and alarm systems were observed
during the assessment.

ATTACHMENT A

APPENDIX A

A366
DETAILED REPORT | STORAGE 2
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page Q3 Conclusion
Due to the condition of Storage 2, it is recommended the structure be fully replaced. The estimated cost for the replacement is $69,000.

ATTACHMENT A

APPENDIX A

A367
Page Q4
DETAILED REPORT | STORAGE 2
CITY OF STOCKTON | FINAL REPORT
This page intentionally left blank.

ATTACHMENT A

APPENDIX A

A368
DETAILED REPORT | ACCESSIBILITY
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page R1 Address: 29981 Plasse Road, Pioneer, CA 95666
Accessibility
Detailed Report
The American with Disabilities Act (ADA) is a
comprehensive federal legislation that prohibits
discrimination against people with disabilities. The
law made it illegal to discriminate against a disabled
person in terms of employment and the provision of
goods and services. The ADA’s purpose is to provide
a “clear and comprehensive national mandate for
the elimination of discrimination against individuals
with disabilities”. Congress emphasized that the ADA
seeks to dispel stereotypes and assumptions about
disabilities and ensure equality of opportunity, full
participation, independent living, and economic self-
sufficiency.

All city programs, services and activities should be
accessible for people with disabilities in compliance
with Title II of the ADA, and Section 504 of the 1973
Rehabilitation Act. Title II of the ADA applies to
public entities, and such entities shall provide a Self- Evaluation Transition Plan (SETP) and identify obstacles that limit accessibility of its programs or activities to individuals with disabilities. Accessibility of facilities or portion of facilities for use by governmental staff is not a requirement of Title II. This report is intended to help the City of Stockton identify architectural barriers to accessibility and develop barrier-removal solutions
that will facilitate access for all individuals. This report does not provide all the components required for a
SETP such as an evaluation of the current programs,
services, policies, or practices provided to the public by the City. In addition, the report does not provide
how the SETP affects people employed by the City.

Finally, this report does not provide procedures for
public input. If implementation of barrier removal will exceed a year, this report does not provide a schedule
or assign priorities to the barriers as required by SETP.

No construction documents were made available
by the City for review to determine what accessible
standards were followed; however, the earliest
mandated accessibility provisions in California went
into effect in the 1982 CBC and the Regulations for the Accommodations of the Disabled as by Office of the
State Architect and dated August 16, 1984.

ADA was passed and signed into law by Congress
in 1990 and the US Department of Justice followed
construction design requirements in 1991 by issuing
the ADA Standards (ADAS). Compliance with ADA
for Title II facilities became mandatory on January
26, 1992. Alterations to the standards and additional
standards for recreation facilities were made in 2010
and became mandatory on March 15, 2012. All facilities, except for recreation facilities, constructed or altered in compliance with the 1991 standards prior to adoption of the 2010 standards, are not required to be altered
due to what is known as “safe harbor.” As noted above,
accessible program access for the public is required
by Title II and is a continuing obligation by public
agencies to maintain access.

In 1968, the federal government passed a law, the
Architectural Barriers Act (ABA) for facilities designed, built, altered, or leased with federal funds. The first ABA Accessibility Standards (ABAAS) issued in 1982
is based on precursor standards of ADA but also
includes federal amendments. The most current
edition of ABAAS was issued in 2015 for outdoor
developed areas. Since ABAAS applies to federal and
federally funded facilities, it is not enforceable under Title II of the ADA. ABAAS does offer guidance for
exterior facilities not addressed in the ADA or CBC
standards. Since Title II entities have a continuing
obligation to provide accessibility for its programs,
the ABA standards are used for evaluation of exterior
elements to the nearest available standard. For this
reason, California State Parks has adopted ABAAS as
their guidelines.

The Title II compliant facilities are assessed according to the regulations and standards of the ADA. Any
past modifications, additions, or new construction of
facilities must be made in accordance with the ADAS
and the California Building Code (CBC) in effect at the

ATTACHMENT A

APPENDIX A

A369
Page R2
DETAILED REPORT | ACCESSIBILITY
CITY OF STOCKTON | FINAL REPORT
time. Chapter 11B of the CBC contains the scoping requirements for access of publicly owned facilities. All recommendations in this report refer to the requirements in the ADAS or ABAAS where applicable.

If alterations are performed on any of the buildings or site facilities, correction of the non-compliant elements must be performed. Where accessible improvements are recommended in the following assessment, any improvements should follow the requirements of ADAS, ABAAS or CBC Chapter 11B.

Kitchell recommends the most stringent requirements of these standards be followed to mitigate any legal claims against the city for noncompliance.

Surveyed Facilities
• S ite
•
P
arking Lot
•
M
anager’s Office
•
C
abin P – Accessible Cabin
•
R
estroom and Showers
•
R
estroom
•
N
urse
•
C
rafts
•
K
itchen
•
Lo
dge
•
V
arious site amenities and recreation facilities on the grounds All the facilities noted above appear to have been constructed prior to the effective date of 1991 ADAS.

Per Title II regulations at 28 CFR 35.151, for any part of the governmentally owned buildings that provides program access to the public, those components should be accessible. For municipality owned or leased buildings, all components for public and non-city staff use should be accessible. All facilities should have an accessible path of travel route from the building entrance to the accessible parking spaces in the onsite parking lot. ADA requirements for access to public street sidewalk, a public transportation stop, and drop off and loading zones do not apply to this site as only means of access to the site is by vehicles. For buildings, the entrance door, washrooms, and other public services specific to the buildings should be accessible.

Access deficiencies for the site facility consisting of the constructed components on the site and buildings is summarized as follows:

Site
All accessible facilities on the site shall be connected by accessible walks on a path of travel with surfaces not exceeding five percent in the direction of travel and two percent cross slope. Any ramps that are part of the path of travel shall not exceed one vertical unit to 12 horizontal units (8.33%) slope and be provided with handrails and toe rail barriers.

A compliant path of travel shall connect all accessible facilities on the site, namely, the accessible parking stalls, cabins, Manager’s Office, Nurse, Crafts, Kitchen, Restroom and Showers, Restroom, Lodge, Reynold’s Memorial Museum, picnic table platforms, fire pit, patio (at rear of Lodge), and recreational areas or courts for volleyball, shuffleboard, tetherball, basketball, and horseshoe pits. A portion of the south loop walk from

ATTACHMENT A

APPENDIX A

A370
DETAILED REPORT | ACCESSIBILITY
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page R3 the Manager’s Office east to the Nurse cabin is compliant for surface slopes. The remaining portions of the loop walk west of Cabin J to the Restroom and Showers building has deficiencies in cross slope and slope in direction of travel. The north loop from the Manager’s Office to the Restroom and Showers building has significant barriers with excessive surface slopes and steps to reach the entrance doors. There is no improved path to the Crafts cabin, Lodge, Kitchen, Reynold’s Memorial Museum, nor any recreational activity areas. Exterior stairs east of the Lodge have unequal risers and lack handrails for accessibility. Unevenness of the stair riser height is a safety risk for normal bodied persons as well. The Lodge stairs should be replaced with concrete stairways and handrails.

Correction of site walks from Cabin P to the Restroom and Showers building to remove steps east of the Restroom and Shower building, and the walk west of Cabin J to the Restroom and Showers building is required for access of all the common features of the site with exception of Reynold’s History Museum which is located at the highest portion of the camp. Given the poor condition of the Museum, it is recommended that no public services be provided that would trigger the need for accessible site access.

The approach to the Lodge and Kitchen has significant barriers as the slope of the drive from the Restroom and Showers building up to the Lodge is more than 10%. Given the road gradient, a developed system of ramps and landings is required to transverse the site’s slope. Alternate means by a wheelchair lift may be feasible but requires maintenance for reliability and is not recommended. An option for temporary or long-term use is equivalent facilitation per code exception (CBC 11B-202.3) with a road vehicle or cart operated by camp staff on demand on the roadway to provide accessible access to the Lodge and Kitchen. If equivalent facilitation is considered by the City, an application to the local authority having jurisdiction must be sought for approval prior to implementation.

The parking lot provides the only means of public access to the site. For the approximately 49 stalls provided in the lot, a minimum of two accessible parking stalls should be provided – one for van accessible and the other for standard accessible use. Only one accessible stall is provided, but it has faded striping and no marked access aisle. An International Symbol of Accessibility (ISA) symbol on the pavement is undersized and in an inappropriate location. Posted sign marking the stalls is also not provided. The pavement slopes in the direction of the stall length are more than the standards. Regarding and repaving a portion of the parking lot for one van and one standard accessible stall and access aisle along with compliant pavement markings and posted signs is recommended.

Figure 1: Lodge Approach Roadway Cross Slope
Figure 2: Exterior Stairs East of Lodge Shown on Left. Fire Pit is On Right Side of View

ATTACHMENT A

APPENDIX A

A371
Page R4
DETAILED REPORT | ACCESSIBILITY
CITY OF STOCKTON | FINAL REPORT
Manager’s Office
Access to the front door and registration desk has significant barriers for entry with exterior steps and raised door thresholds. Within the building, the transaction desk height exceeds the standards. As a recommendation, demolish the steps and provide a compliant concrete ramp and landing, door thresholds, and alter the registration desk to provide a surface not more than 34” above the finish floor. .

Figure 3: Accessible Parking Stall at Parking Lot
Figure 4: Manager’s Office Exterior Building

ATTACHMENT A

APPENDIX A

A372
DETAILED REPORT | ACCESSIBILITY
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page R5 Cabin P
Approximately 65 cabins are provided at Silver Lake, and Cabin P has been designated by the camp as the sole accessible unit. ABAAS defines the cabin as a Camp Shelter used for camping for weather protection and does not contain plumbing fixtures or kitchen applies. For approximately 65 units provided at the Silver Lake Campground a minimum number of four camping units with mobility features should be provided per ABAAS F244.2. Significant barriers exist at the cabin entrance door as the opening width is less than the standards, and the concrete pavement at the door does not provide full maneuvering access space at the door for entry. Inside the cabin, the mounting height of the light switch, receptacle, and window latch does not meet the standards.

Four new purpose-built accessible cabins are recommended in lieu of correcting the existing cabins.

Figure 5: Cabin P Exterior with Manager’s Office at Left

ATTACHMENT A

APPENDIX A

A373
Page R6
DETAILED REPORT | ACCESSIBILITY
CITY OF STOCKTON | FINAL REPORT
Restroom
Male and female restrooms are provided in a detached building east of the Kitchen building. Significant barriers exist at the restrooms, as the door opening width is undersized, inadequate maneuvering space is provided for door operation, and it lacks space for wheelchair turn around within the rooms. There are no accessible plumbing fixtures inside the restrooms and toilet accessories are mounted too high for access. Mounted between the restroom entries is a single exterior grade drinking fountain. The mounting height of the drinking fountain is too high, and the unit does not provide a compliant knee space for access. In view of significant barriers present in the restrooms, a replacement restroom building with a bi-level drinking fountain is recommended for compliance.

Restroom and Showers
The earliest mandated accessibility provisions were in effect in the 1982 CBC and the Regulations for the Accommodations of the Disabled as by Office of the State Architect and dated August 16, 1984. This likely applies to the Restroom and Showers building which appears to have been built about that time. Some accessible accommodations were constructed in the facility.

Access to the facility was limited to the women’s restroom due to snow accumulation on the other side of the building. The accessible women’s restroom toilet is stall mounted, and the size of the stall and location of the toilet does not comply with the standards in the reference standard noted above. An accessible shower stall is not provided in the restroom. Lavatories in the restroom do comply with the standards. It is assumed that the men’s restroom has similar deficiencies. Alterations of the Restroom and Showers building are recommended for compliance.

Figure 6: Restroom and Showers West Exterior View

ATTACHMENT A

APPENDIX A

A374
DETAILED REPORT | ACCESSIBILITY
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page R7 Nurse
A barrier is present at the entrance as the door width is inadequate and the threshold is raised at the door opening. All interior doors from the entrance to the triage room, bedroom, and bathroom lack the required minimum width for room access, and the bathroom does not have an access compliant shower or toilet for use.

In view of significant barriers present in the Nurse cabin, a replacement building with compliant triage, bedroom, and bathroom is recommended for compliance.

Figure 8: Nurse Cabin Bathroom
Figure 7: Nurse Cabin Exterior

ATTACHMENT A

APPENDIX A

A375
Page R8
DETAILED REPORT | ACCESSIBILITY
CITY OF STOCKTON | FINAL REPORT
Crafts
Kitchell could not evaluate the accessibility of the Crafts cabin as the entrance door was covered with plywood.

The existing concrete pavement stoop at three sides of the cabin does not have an improved surface for connection to the site path of travel about the camp.

Kitchen
The food serving line is at an enlarged wall opening on the building’s south face. The surface slope of the asphalt at the line exceeds 2.5% and is not compliant for access. The service counter was not in place for review to determine if it met the accessibility standards. Interior portions of the Kitchen are for staff use and accessibility within is not a requirement. Compliant pavement slopes at the serving line are recommended for compliance with the requirements.

Figure 9: Crafts Cabin
Figure 10: Exterior Southeast Corner of Kitchen

ATTACHMENT A

APPENDIX A

A376
DETAILED REPORT | ACCESSIBILITY
SILVER LAKE CAMPGROUND FACILITIES CONDITION ASSESSMENT | Page R9 Lodge
Kitchell could not evaluate the accessibility of the Lodge as the approach to the Lodge entrance and accommodations was restricted by snowbanks. The patio at the Lodge’s rear is higher than the building floor, and no ramp is provided for access to the patio or the BBQ. Access to the multiple levels of the rear patio by ramps is recommended.

Site Facilities
Per 2010 ADA, any additions or alterations of site elements would require compliance with the current standards.

Per ADAS 206.2.12 an accessible route should be provided to both sides of the court. This requirement applies at the horseshoe pits, shuffleboard and volleyball courts, basketball free-throw lanes in the parking lot, and tetherball court over the leach field. None of these elements have an improved surface in compliance with the requirements, and the basketball lanes situated in the parking lot do not offer a safe path of travel. The shuffleboard and volleyball courts and basketball lanes have surfaces with slopes that exceed the standards. As a recommendation, compliant courts, and path of travel to the court should be provided.

Several picnic tables are located at concrete pads for future cabins. No compliant path of travel is provided to the pads and none of the picnic tables have accessible clear knee space for access. As a recommendation, provide path of travel improvements from picnic pads adjacent to the designated accessible cabins to the common path around the camp.

The large communal fire pit located at the bottom of the lodge access stairs lacks a compliant path of travel to the seating positions. For a recommendation, a path of travel from common path of the camp to a designated accessible space measuring 30” wide by 48” depth should be provided adjacent to the log seats for viewing.

Figure 11: West Side of Lodge with Raised Deck and BBQ on Left of View. Shown Beyond Lodge is the Kitchen

ATTACHMENT A

APPENDIX A

A377
Page R10
DETAILED REPORT | ACCESSIBILITY
CITY OF STOCKTON | FINAL REPORT