ADDITIONAL SERVICES REQUEST FORM
Date: April 08, 2026
Projec
t: Stockton Animal Services Facility Additional Services #10 The following is an agreement between Studio Miers | Chou | Poon Architects and the City of Stockt
on for authorization of additional services. The proposed basis of adjustment will be adjusted to the Contract as follows:

Client: City of Stockton
Project Manager – Travis Pazin
Signed: ___________________________________________ Date: ______________________ 5845 DOYLE STREET, SUITE 106 EMERYVILLE, CA 94608 TEL 510.285.6000 Project scope/services: Construction Administration Services to be increased by $200,000.

The original contract for this project, dated July 7, 2022, anticipated a completion no later than 8/31.2025, which is when the contract expires. This additional fee request will cover architectural services due largely to the extended Construction Administration time requirements and owner-initiated plan changes for the project, which are outlined in correspondence from George Miers, Principal of Studio MCP, to Travis Pazin dated March 23, 2026 and March 26th, 2026.

Conditi
ons:
$120,000 for SMCP staff to provide additional construction administration services through project completion and closeout (assuming completion by October 2026). $80,000 for ZFA, Capital, and HCS to provide additional CA services. This would also be the bucket of funding we would draw from for owner-initiated plan changes requested from these firms.

1.0 Additional Service

1.1 Stu
dio MCP Architectural $120,000 NTE

1.2 MEP Consultants $ 80,000 NTE

TOTAL A
DDITIONAL SERVICE $200,000 NTE
As discussed in that correspondence, the change in the scope of work in the Iso Dog has occurred, and fee proposals are outlined below. Please note Capital Engineer’s fee is an estimate as we are still waiting for their proposal:

2.0 ISO DOG Scope Change (part of Add Service above)

2.1 Stu
dio MCP Architectural $24,400 NTE
24 x $275 = $6,600
56 x $175 = $9,800
80 x $100 = $8,000

2.2 ZFA Proposal $ 7,500 NTE

2.3 Capital Engineering $ 7,500 (EST.)

2.4 HCS Electrical Consultant $ 2,100 NTE
TOTAL ISO DOG CHANGE $41,500 NTE+EST.

Attachment: ZFA and HCS proposal.

EXHIBIT A

ATTACHMENT B

EXTRA SERVICES

AUTHORIZATION
George Miers

MIERS CHOU POON
Email: [email protected]
Phone: 510-285-6016
Project Name: Stockton Animal Shelter Renovation
Extra Service Name:

Project Number:

Extra Services Requested by:

Project Description:

Scope of Services:

Fee for Extra Services:

Billing Type: Fixed
It is ZFA's understanding that a re-design of the dog isolation room 501 in the steel building is required as part of ASI #3. ZFA reviewed the architectural A7.11 drawings and building department comments provided by Rachel Slonicki via email dated March 30, 2026. Structural scope includes: full-height wall detail references, low-height wall details, coordination with architect on trench drain locations, depths, and warped slabs in relation with existing foundations, revisions to previously submitted S2.3 existing steel building floor plan and details, markups on architectural ceiling wall details, exterior wall opening details and analysis, and coordination with contractor for information not found on existing steel building plan drawings on file.
22144.00
Miers Chou Poon
• Coordination meetings
• Structural calculations
• Revised structural drawings and details as part of ASI #3. • Support through public agency approval.
•
Construction administration, review, and support, excluding site visits. $7,500
Dog Isolation Re-design
5845 Doyle Street, Suite 106
Emeryville, CA 94608
7801 folsom blvd | suite 204 | sacramento ca 95826 | 916 924 7024 | zfa.com

EXHIBIT A

ATTACHMENT B
AUTHORIZATION (two signatures required):

ZFA STRUCTURAL ENGINEERS
By: Date:

Dudley Mei, PE 90243
Senior Engineer
By: Date:

Mickey C. Kellogg, SE 5851

MIERS CHOU POON
By: Date:

Print Name:

Principal
The previously agreed to detailed Terms and Conditions are hereby incorporated by reference in the entirety as an integral part of this Agreement.

Client's acceptance of this Agreement includes full acceptance of all Terms and Conditions without condition or reservation. 3/31/2026
3/31/2026
Please Initial _____

EXHIBIT A

ATTACHMENT B
HCS ENGINEERING, INC.

CONSULTING ELECTRICAL ENGINEERING 4512 FEATHER RIVER DR. STE. F STOCKTON, CA 95219
(209) 478-8270
FAX (209) 478-2169
TO: Geore Miers
Studio Miers/Chou/Poon
5845 Doyle Street, Suite 104
Emeryville, CA 94608
In accordance with the original contract HCS Engineering will provide the following extra services on the above referenced project.

1. Dog Isolation
With lighting, minimal power and fan.

NOTE: This change of scope is in addition to the original contract. This Agreement does not include printing, shipping of drawings or calculations. Any such printing or shipping shall be done on a costplus basis to the Contract.

WE WILL make the change(s) specified above at this price. $2100 ACCEPTED. The above prices and
specifications of this Change Request are
satisfactory and are hereby accepted. All work
to be performed under same terms and
conditions as specified in original contract
unless otherwise stipulated.

Date of acceptance _____________________
Signature
____________________________________
(CLIENT)

CHANGE OF SCOPE
DATE: 04/02/2026
PROJECT: Stockton Animal Shelter
Dog Isolation Remodel
LOCATION: Stockton
PROJECT NO. ARCH NO.

EXHIBIT A

ATTACHMENT B
Updated 8.26.25
Vendor: Date: 04/07/26
Dept: Contract 422000793
Account # Requestor: Travis Pazin
712,809.00$
05/24/22
Original Contract Council Approval Date: 05/24/22
08/31/25
1,078,744.00$
365,935.00$
Effective Date: Dec 2, 2021
CM Authority: $ 100,000 08/31/27

DM W D CM CC
CURRENT BALANCES OF CCOs
Last Council Action -$ 05/24/22 712,809.00$ 171,280.90$ Total approved CCOs since last Council Action 165,935.00$ 24 878,744.00$ 5,345.90$ NEW PROPOSED CCOs
878,744.00$ 171,280.90$
7 Additional Design Services 200,000.00$ Y 1,078,744.00$ (194,654.10)$ Current CCO amount 200,000.00$
PREVIOUSLY APPROVED CCOs
Original Contract Y 05/24/22 712,809.00$
1 Additional Design Services 27,900.00$ Y 740,709.00$
2 Change Names -$ Y 740,709.00$
3 Additional Design Services 15,690.00$ Y 756,399.00$
4 Additional Design Services 10,000.00$ Y 766,399.00$
5 Additional Design Services 32,345.00$ 24 Y 798,744.00$ 6 Additional Design Services 80,000.00$ Y 878,744.00$
Previous CCO Amount -----> 165,935.00$ 24 5/24/2022 712,809.00$ Total CCO Amount and Time Extension To-Date -----> 365,935.00$ 24

CHANGE ORDER CALCULATOR
1 Studio Miers Chou Poon (formerly Swatt Miers Architects) 1Public Works
4510-000-800007-300-000-30-45-000-000

ENTRIES IN BOLD RED INDICATE
YOUR BALANCE OF CM AUTHORITY CCO AMOUNT IS EXCEEDED.

YOU MUST GO TO COUNCIL FOR APPROVAL.

Original Contract Amount:
2 Original Contract Award Date:

Original Contract Expiration Date:

Contract Amount to date:
3 Authorized CCO Amount to date:

Contract Expiration to date:
4 CCO No. Description
Requested
CCO Amount
Time
Extensions Revised
Contract Amount
Revised
CCO Authority Balance
4 5
Required
Approval
by:

Date CC
Approved
(mm/dd/yy)

ATTACHMENT B