Resolution No.
STOCKTON CITY COUNCIL
RESOLUTION APPROPRIATING FUNDS, APPROVING THE PLANS AND SPECIFICATIONS, AND AWARDING A CONSTRUCTION CONTRACT FOR THE BRIDGE REHABILITATION, PROJECT NO. WT16003/FEDERAL PROJECT NO. BPMP-5008(157) On October 30, 2025, the City Clerk of the City of Stockton opened, examined, and publicly declared the sealed proposals or bids offered for the Bridge Rehabilitation, Project No. WT16003/Federal Project No. BPMP-5008(157); and The project will complete maintenance work on six bridges located throughout the City. The maintenance repairs include scour protection measures, deck sealing, road approach repairs, bridge joint seal replacements, concrete and drainage repairs, striping application, barrier rail repairs, sidewalk replacements, and erosion control measures. The six locations are:
West Lane over Calaveras River
Pershing Avenue over Calaveras River
Diamond Street over Mormon Slough
Santa Paula Way over Mosher Slough
Aurora Street over Mormon Slough
Turnpike Road over Walker Slough
The bid from Pacific Infrastructure Construction, LLC was the lowest bid. However, Pacific Infrastructure Construction, LLC submitted a request for bid relief due to a clerical error that materially changed Pacific Infrastructure Construction, LLC’s bid; and Valentine Corporation is the second lowest bidder in the amount of $2,279,349 and its bid is regular in all respects; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF STOCKTON, AS FOLLOWS:
The City Council approves the appropriation of funds in the amount of $448,124 from the Gas Tax Fund Balance to the Bridge Rehabilitation, Project No. WT16003/Federal Project No. BPMP-5008(157).
The City Council approves the plans and specifications for the Bridge Rehabilitation, Project No. WT16003/Federal Project No. BPMP-5008(157).
The City Council awards a Construction Contract between the City of Stockton and Valentine Corporation, in the amount of $2,279,349, and the City Manager is authorized and directed to execute same, a copy of which is attached as Exhibit 1 and incorporated by this reference.
The City Manager is hereby authorized to take whatever actions are necessary and appropriate to carry out the purpose and intent of this Resolution.
PASSED, APPROVED, and ADOPTED June 9, 2026 .
CHRISTINA FUGAZI
Mayor of the City of Stockton
ATTEST:
KATHERINE ROLAND, CMC, CPMC
City Clerk of the City of Stockton