Resolution No.

STOCKTON CITY COUNCIL
RESOLUTION APPROPRIATING AND TRANSFERRING FUNDS, AND AWARDING A PROFESSIONAL SERVICES CONTRACT FOR THE FEATHER RIVER DRIVE AND DRIFTWOOD PLACE ROUNDABOUT INSTALLATION, PROJECT NO. WT25055/FEDERAL PROJECT NO. CML-5008(224) On October 6, 2025, the City advertised a Request for Proposals (RFP) for design of the Feather River Drive and Driftwood Place Roundabout Installation, Project No WT25055/Federal Project No. CML-5008(224). One proposal was received; and On November 5, 2025, the City re-advertised an RFP for design of the Feather River Drive and Driftwood Place Roundabout Installation, Project No WT25055/Federal Project No. CML-5008(224). One proposal was received; and A Selection Committee evaluated the proposal submitted by Siegfried Engineering, Inc. Siegfried Engineering, Inc. was determined to be qualified for this project. Staff negotiated a fee in the amount of $361,772 with Siegfried Engineering, Inc. for design services; and The project will install a roundabout, Americans with Disabilities Act standard ramps, interconnected Pan-Tilt Zoom camera, rectangular rapid flashing beacons, signage, fiber optic connections, roadway resurfacing, and lighting enhancements. Additionally, a Class II bicycle lane will be installed along Driftwood Place to Riverbrook Drive; and Siegfried Engineering, Inc. was determined to be qualified and have the staff to perform the required work. Staff negotiated a fee in the amount of $361,772 with Siegfried Engineering, Inc for design services; and Transfer of funds is needed for the City’s required local match of $67,000; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF STOCKTON, AS FOLLOWS:

The City Council approves the appropriation of funds in the amount of $487,000 from Federal Funding to the Feather River Drive and Driftwood Place Roundabout Installation, Project No. WT25055/Federal Project No. CML-5008(224).

The City Council approves the transfer of funds in the amount of $67,000 from the Traffic Signal Modification, Project No. WT15029, to the Feather River Drive and Driftwood Place Roundabout Installation, Project No. WT25055/Federal Project No. CML-5008(224).

The City Council approves findings pursuant to Stockton Municipal Code (SMC) section 3.68.070 in support of an exception to the competitive bidding process. These findings include:

The City does not have sufficient staff resources to design this project.

The scope of design services requires an engineering firm experienced in the design of roundabouts.

Use of the RFP process is appropriate for this Professional Services Contract because it relies on the evaluation of professional qualifications and performance as the basis for selection of a vendor. Use of the criteria helps ensure selection of a vendor that will provide the highest quality professional service, which is in the public interest.

The City negotiated a contract following solicitation of competitive proposals in accordance with SMC section 3.68.070.A.3.

The City Council awards a Professional Services Contract between the City of Stockton and Siegfried Engineering, Inc., in the amount of $361,772, and the City Manager is authorized and directed to execute same, a copy of which is attached as Exhibit 1 and incorporated by this reference.

The City Manager is hereby authorized to take whatever actions are necessary and appropriate to carry out the purpose and intent of this Resolution.

PASSED, APPROVED, and ADOPTED July 21, 2026 .

CHRISTINA FUGAZI
Mayor of the City of Stockton
ATTEST:

KATHERINE ROLAND, CMC, CPMC
City Clerk of the City of Stockton