Bid Summary
PW22-08 Sanitary Sewer Main Replacement
2021 (UY-18-08)
Description QTY UNIT Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Mobilization (Recommended Not Exceed 5% of
Total Base Bid) 1 LS* 50,000.00$ 130,000.00$ 65,000.00$ 120,000.00$ 140,000.00$ 130,000.00$ 110,000.00$ 150,000.00$ 200,000.00$ Erosion Control 1 LS* 5,000.00$ 15,000.00$ 5,000.00$ 5,000.00$ 16,000.00$ 15,000.00$ 9,864.00$ 5,000.00$ 25,000.00$ Traffic Control 1 LS* 50,000.00$ 40,000.00$ 30,000.00$ 15,000.00$ 110,000.00$ 70,000.00$ 30,000.00$ 50,000.00$ 275,000.00$ Sheeting, Shoring, and Bracing 1 LS* 25,000.00$ 40,000.00$ 30,000.00$ 20,000.00$ 104,000.00$ 35,000.00$ 125,000.00$ 50,000.00$ 150,000.00$ Repair 8-Inch and 10-Inch Sewer by CIPP Method
- Site 1 Sterling Blvd. 658 LF 75.00$ 49,350.00$ 100.00$ 65,800.00$ 100.00$ 65,800.00$ 105.00$ 69,090.00$ 240.00$ 157,920.00$ 100.00$ 65,800.00$ 175.00$ 115,150.00$ 200.00$ 131,600.00$ 385.00$ 253,330.00$ Construct 10-Inch Sewer by Pipe Bursting Method
– Site 2 Jackpine Ct. 401 LF 195.00$ 78,195.00$ 200.00$ 80,200.00$ 220.00$ 88,220.00$ 215.00$ 86,215.00$ 230.00$ 92,230.00$ 250.00$ 100,250.00$ 280.00$ 112,280.00$ 300.00$ 120,300.00$ 283.00$ 113,483.00$ Construct 8-Inch Sewer by Open Cut Method 2,929 LF 260.00$ 761,540.00$ 250.00$ 732,250.00$ 250.00$ 732,250.00$ 220.00$ 644,380.00$ 190.00$ 556,510.00$ 325.00$ 951,925.00$ 350.00$ 1,025,150.00$ 300.00$ 878,700.00$ 284.00$ 831,836.00$ Construct 8-Inch Sewer by Open Cut Method –
Site 9 El Camino Real 289 LF 260.00$ 75,140.00$ 450.00$ 130,050.00$ 650.00$ 187,850.00$ 500.00$ 144,500.00$ 360.00$ 104,040.00$ 400.00$ 115,600.00$ 375.00$ 108,375.00$ 350.00$ 101,150.00$ 424.00$ 122,536.00$ Construct Lateral Connection – PVC Main 82 EA 600.00$ 49,200.00$ 300.00$ 24,600.00$ 100.00$ 8,200.00$ 1,200.00$ 98,400.00$ 400.00$ 32,800.00$ 500.00$ 41,000.00$ 200.00$ 16,400.00$ 250.00$ 20,500.00$ 1,389.00$ 113,898.00$ Construct 8-Inch Sewer by Open Cut Method,
Option to Replace by Pipe Bursting Method 4,595 LF 187.00$ 859,265.00$ 200.00$ 919,000.00$ 225.00$ 1,033,875.00$ 207.00$ 951,165.00$ 190.00$ 873,050.00$ 210.00$ 964,950.00$ 260.00$ 1,194,700.00$ 300.00$ 1,378,500.00$ 205.00$ 941,975.00$ Construct Lateral Connection – PVC Main or
HDPE Main 128 EA 1,000.00$ 128,000.00$ 250.00$ 32,000.00$ 100.00$ 12,800.00$ 1,200.00$ 153,600.00$ 400.00$ 51,200.00$ 500.00$ 64,000.00$ 200.00$ 25,600.00$ 350.00$ 44,800.00$ 1,390.00$ 177,920.00$ Extension of Lateral Service Connection to
Existing 8-Inch Sewer by Open Cut Method – Site
8 Morse Ave.
25 EA
3,000.00$ 75,000.00$ 6,000.00$ 150,000.00$ 4,000.00$ 100,000.00$ 4,000.00$ 100,000.00$ 5,500.00$ 137,500.00$ 1,000.00$ 25,000.00$ 4,000.00$ 100,000.00$ 1,750.00$ 43,750.00$ 7,751.00$ 193,775.00$ Rehabilitate Manhole. Replace Manhole Frame,
Cover and Grade Rings, and Remove Rungs 42
EA
5,000.00$ 210,000.00$ 1,500.00$ 63,000.00$ 1,500.00$ 63,000.00$ 4,000.00$ 168,000.00$ 2,000.00$ 84,000.00$ 5,200.00$ 218,400.00$ 2,000.00$ 84,000.00$ 1,000.00$ 42,000.00$ 2,203.00$ 92,526.00$ Coat Manhole Interior 1 EA 4,000.00$ 4,000.00$ 4,000.00$ 4,000.00$ 6,000.00$ 6,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 6,500.00$ 6,500.00$ 4,000.00$ 4,000.00$ 7,000.00$ 7,000.00$ 4,296.00$ 4,296.00$ Modify Manhole Base, Channel, and Walls 34 EA 1,000.00$ 34,000.00$ 1,500.00$ 51,000.00$ 1,500.00$ 51,000.00$ 600.00$ 20,400.00$ 2,000.00$ 68,000.00$ 2,200.00$ 74,800.00$ 1,000.00$ 34,000.00$ 2,500.00$ 85,000.00$ 3,610.00$ 122,740.00$ Construct New Manhole 3 EA 5,000.00$ 15,000.00$ 12,000.00$ 36,000.00$ 9,000.00$ 27,000.00$ 8,000.00$ 24,000.00$ 8,000.00$ 24,000.00$ 10,500.00$ 31,500.00$ 12,000.00$ 36,000.00$ 6,000.00$ 18,000.00$ 17,148.00$ 51,444.00$ Abandon Existing Sewer at Morse Ave. 1,378 LF 4.00$ 5,512.00$ 5.00$ 6,890.00$ 8.00$ 11,024.00$ 3.00$ 4,134.00$ 10.00$ 13,780.00$ 8.00$ 11,024.00$ 5.00$ 6,890.00$ 10.00$ 13,780.00$ 13.00$ 17,914.00$ Abandon Existing Manhole 4 EA 2,000.00$ 8,000.00$ 2,500.00$ 10,000.00$ 2,000.00$ 8,000.00$ 500.00$ 2,000.00$ 1,200.00$ 4,800.00$ 2,000.00$ 8,000.00$ 1,000.00$ 4,000.00$ 1,500.00$ 6,000.00$ 8,100.00$ 32,400.00$ Install Slurry Seal Type III with 2.5% Latex 288000 SF 0.52$ 149,760.00$ 0.55$ 158,400.00$ 0.63$ 181,440.00$ 0.52$ 149,760.00$ 0.70$ 201,600.00$ 0.70$ 201,600.00$ 0.55$ 158,400.00$ 0.60$ 172,800.00$ 0.50$ 144,000.00$ Wet Utility Crossing Support 18 EA 500.00$ 9,000.00$ 500.00$ 9,000.00$ 100.00$ 1,800.00$ 200.00$ 3,600.00$ 200.00$ 3,600.00$ 500.00$ 9,000.00$ 500.00$ 9,000.00$ 250.00$ 4,500.00$ 1,098.00$ 19,764.00$ Pre-Installation Cleaning and Video Inspection of
Sewer 11023 LF 3.00$ 33,069.00$ 4.00$ 44,092.00$ 4.00$ 44,092.00$ 2.00$ 22,046.00$ 3.00$ 33,069.00$ 5.00$ 55,115.00$ 2.00$ 22,046.00$ 4.00$ 44,092.00$ 19.00$ 209,437.00$ Post-Installation Video of Completed Sewer 9645 LF 2.00$ 19,290.00$ 3.00$ 28,935.00$ 3.00$ 28,935.00$ 2.00$ 19,290.00$ 3.00$ 28,935.00$ 5.00$ 48,225.00$ 1.00$ 9,645.00$ 4.00$ 38,580.00$ 13.00$ 125,385.00$ Back Yard Restoration Site 2 Jackpine Ct. 1 LS* 5,000.00$ 20,000.00$ 10,000.00$ 5,000.00$ 3,000.00$ 15,000.00$ 5,000.00$ 10,000.00$ 25,000.00$ Trench Overexcavation and Backfill (Recoverable
Bid Item) 100 CY 100.00$ 10,000.00$ 50.00$ 5,000.00$ 50.00$ 5,000.00$ 20.00$ 2,000.00$ 30.00$ 3,000.00$ 3.00$ 300.00$ 25.00$ 2,500.00$ 100.00$ 10,000.00$ 200.00$ 20,000.00$ 2,708,321.00$ 2,795,217.00$ 2,796,286.00$ 2,832,580.00$ 2,848,034.00$ 3,257,989.00$ 3,348,000.00$ 3,426,052.00$ 4,263,659.00$ Surety
License
Sub Contractor
Christian
Brother's Lining,
Co.

CIPP Lining Coat Manhole InteriorRoys Sewer
Service CCTV Graham
Contractors, Inc. Slurry Seal Insituform CIPP Lining
American
Asphalt
Repair &
Resurfacing
Co., Inc.

Slurry Sseal Chrisp Co. Striping Insituform
Technologies
Cured in Place
Lining CIPP
Chrisp
Company Striping Bond
Blacktop, Inc. Slurry Seal
H&R Plumbing
and Draw
Cleaning
Manhole Rehab Norcal
Pipelines CIPP Nor-Cal Pipeline
Services CIPP Graham
Contractors Slurry Seal Insituform CIPP Bond Blacktop,
Inc. Slurry Sealing
Graham
Contractors,
Inc.

Slurry Sesal
Graham
Contractors,
Inc
Slurry Seal Chrisp
Company Striping
Cell-Crete Pipe Abandonment Graham
Contractors Slurry Seal Chrisp Company Striping H&R
Plumbing
Manhold
Rehabilitation
H&R Plumbing
and Drain
Cleaning, Inc.

MH rehab Insituform
Technologies CIPP
Pipe and
Plant
Solutions, Inc.

CCTV
Graham ContractorsSlurry Seal Cell-Crete Pipe
Abandonment
Christian
Brothers Lining Roy's sewer
Service, Inc. CCTV Ditch Witch
West Pipe Burst
NorCal
Pipeline,
Services
Manhole Coating
Casey Construction, Inc.
619 Sylvan Way
Emerald Hills, CA 94062
James G. McGrillen
10% Bid Bond
A
Westland Contractors, Inc.
3100 E. 10th Street, Unit A
Oakland, CA 94601
Neil Hunt
10% Bid Bond
A
10% Bid Bond
A
10% Bid Bond 10% Bid Bond
A A
Total Base Bid
Bay Pacific Pipelines, Inc Devaney Engineering, Inc. Cratus, Inc. 214 Paciteco Ave
Novato, CA 94947
Eugene Carew
1641 Lombard St.,
San Francisco, CA 94123
Derek Devaney
945 Taraval Street #302
San Francisco, CA 94116
Michael Kirwan
10% Bid Bond 10% Bid Bond
A, C-10 A
C2R Engineering, Inc. K J Woods Construction, Inc.
100 Mountain View Ave.

Los Altos, CA 94024
PO Box 947
S San Francisco, CA 94083
Trevor Connolly Kieran Woods
SubTerra Construction, Inc.
1350 Van Dyke Ave, Ste 101
San Francisco, CA 94124
Kevin Fitzpatrick
10% Bid Bond
A
Mitchell Engineering
1395 Evans Avenuee
San Francisco, CA 94124
Kathleen Streblow
10% Bid Bond
A
Attachment 1

Page 1 of 1 ends