DRAFT 5/6/22__________
T-DPW-190043/62387 1
Council Agenda:

Item No.:

RESOLUTION NO. ______

RESOLUTION ADOPTING PROJECT LISTING FOR
FISCAL YEAR 2022/23 FUNDED BY SENATE BILL 1, THE
ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017
WHEREAS, California State Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017, was passed by the California Legislature and signed into law by the Governor of California in April 2017 to address statewide transportation funding shortfalls; and WHEREAS, SB 1 includes accountability and transparency provisions to ensure that the residents of the City of Sunnyvale are aware of the projects proposed for funding in the community and which projects have been completed each fiscal year; and WHEREAS, the City of Sunnyvale must adopt by resolution a list of proposed projects to receive fiscal year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, which must include a description and the location of each proposed project, a proposed schedule for the project’s completion, and the estimated useful life of the improvement; and
WHEREAS, the City of Sunnyvale must also submit the list of the proposed projects to the California Transportation Commission (CTC); and
WHEREAS, the City of Sunnyvale has used a Pavement Management System to develop the proposed project list to ensure that revenues are being used on the most high-priority and cost-effective projects that also meet the community’s priorities for transportation investment; and
WHEREAS, the City of Sunnyvale is estimated to receive $3.5 million in fiscal year 2022/23 from RMRA; and
WHEREAS, the fiscal year 2022/23 funding from RMRA will allow the City of Sunnyvale to maintain, rehabilitate and resurface various street segments throughout the City this year; and
WHEREAS, this is the sixth year in which the City of Sunnyvale is receiving SB 1 funding which will enable the City of Sunnyvale to continue essential road maintenance and rehabilitation projects, safety improvements, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB 1 funding; and Attachment 2

Page 1 of 12 ends

T-DPW-190043/62387 2
Council Agenda:

Item No.:

WHEREAS, the SB 1 project lists and overall investment in the City’s local streets and roads with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting-edge technology, materials and practices, will have significant positive regional co-benefits.

NOW, THEREFORE IT IS HEREBY RESOLVED, BY THE CITY COUNCIL OF THE CITY OF SUNNYVALE THAT:

1. The City Council hereby finds that the facts set forth in the recitals to this Resolution are true and correct, and establish the factual basis for the City Council’s adoption of this Resolution.

2. The City Council hereby adopts the Resolution approving the fiscal year 2022/23 Project Listing pursuant to the Road Repair and Accountability Act of 2017.

3. The City Council hereby approves the following list of newly proposed projects which will be funded in-part or solely with fiscal year 2022/23 Road Maintenance and Rehabilitation Account revenues:
[Project Tables Start on Next Page]
Attachment 2

Page 2 of 12 ends

T-DPW-190043/62387 3
Council Agenda:

Item No.:

Project Title: Java Drive Road Diet and Bike Lanes, TR-21-02 Project Description: Only Slurry Seal Portion
Project Location: See table below
Estimated Project Schedule: June 2022 – October 2022
Estimated Project Useful Life: 10-20 years
No. Street Begins Ends SQ FT Projected
Treatment
1 Java Mathilda Bordeaux (ctr)1 59,438 Patch, Crackseal, Slurry Seal
2 Java Bordeaux (ctr) Borregas (ctr) 71,488 Patch, Crackseal, Slurry Seal
3 Java Borregas (ctr) Geneva (ctr) 67,742 Patch, Crackseal, Slurry Seal
4 Java Geneva (ctr) Crossman (ctr) 69,211 Patch, Crackseal, Slurry Seal

TOTAL SQ
FOOTAGE 267,879
1 The tables utilize the following abbreviations:
ctr – center of intersection
s/s – south side
e/s – east side
w/s – west side
n/s – north side
n/o – north of
w/o – west of
Attachment 2

Page 3 of 12 ends

T-DPW-190043/62387 4
Council Agenda:

Item No.:

Project Title: ATP - Safe Routes to School (Maude and Sunnyvale Avenues), TR-18-05 Project Description: Only Slurry Seal and Restriping Portion Project Location: See table below
Estimated Project Schedule: September 2022 – July 2023
Estimated Project Useful Life: 10-20 years
No. Street Begins Ends SQ FT Projected
Treatment
1 N Sunnyvale
Ave Maude Ave (s/s) Hazelton Ave (ctr) 37,938 Patch, Crackseal, Slurry Seal
2 N Sunnyvale
Ave
Hazelton Ave
(ctr) Taylor Ave (ctr) 9,800 Patch, Crackseal,
Slurry Seal
3 N Sunnyvale
Ave Taylor Ave (ctr) E Arques Ave (ctr) 26,360 Patch, Crackseal, Slurry Seal
4 N Sunnyvale
Ave
E Arques Ave
(ctr) E California Ave (ctr) 34,031 Patch, Crackseal,
Slurry Seal
5 N Sunnyvale
Ave
E California
Ave (ctr) E Hendy Ave (ctr) 44,401 Patch, Crackseal,
Slurry Seal

TOTAL SQ
FOOTAGE 152,530
Attachment 2

Page 4 of 12 ends

T-DPW-190043/62387 5
Council Agenda:

Item No.:

Project Title: Slurry Seal 2022-B, ST-22-03
Project Description: Slurry Seal
Project Location: See table below
Estimated Project Schedule: March 2022 – October 2022
Estimated Project Useful Life: 10-20 years
No. Street Begins Ends SQ FT Projected
Treatment
1 Mary Central California 59,707 Patch, Crackseal,
Slurry Seal
2 Mary California Evelyn 71,968 Patch, Crackseal,
Slurry Seal
3 Mary Evelyn Bidwell 46,296 Patch, Crackseal,
Slurry Seal
4 Mary Bidwell Carson 15,762 Patch, Crackseal,
Slurry Seal
5 Mary Carson Washington 52,265 Patch, Crackseal,
Slurry Seal
6 Mary Washington Iowa 7,374 Patch, Crackseal,
Slurry Seal
7 Mary Iowa El Camino Real 83,317 Patch, Crackseal,
Slurry Seal
8 Reed Evelyn Timberpine 112,828 Patch, Crackseal,
Slurry Seal
9 Reed Timberpine Lawrence 140 w/o
e/end island 77,923 Patch, Crackseal,
Slurry Seal
10 Remington Michelangelo Sunnyvale/Saratoga 122,346 Patch, Crackseal, Slurry Seal
11 Remington El Camino Real Michelangelo 38,294 Patch, Crackseal, Slurry Seal
12 Sunnyvale/
Saratoga El Camino Real Mathilda 82,973 Patch, Crackseal, Slurry Seal

TOTAL SQ
FOOTAGE 771,053
Attachment 2

Page 5 of 12 ends

T-DPW-190043/62387 6
Council Agenda:

Item No.:

Project Title: Slurry Seal 2023-B, ST-23-XX
Project Description: Slurry Seal
Project Location: See table below
Estimated Project Schedule: July 2022 – October 2023
Estimated Project Useful Life: 10-20 years
No. Street Begins Ends SQ FT Projected
Treatment
1 E Arques
Ave Commercial Lawrence
Expwy 219,852 Patch, Crackseal,
Slurry Seal
2 E Arques
Ave
Lawrence Expwy
w/o island nose Ctr of Lakeside 43,313 Patch, Crackseal, Slurry Seal
3 E Arques
Ave Ctr of Lakeside Ctr of Oakmead 85,075 Patch, Crackseal, Slurry Seal
4 Hollenbeck
Ave
El Camino Real
(s/s) Danforth (ctr) 109,802 Patch, Crackseal,
Slurry Seal
5 Hollenbeck
Ave Danforth (ctr) Harvard (ctr) 49,626 Patch, Crackseal, Slurry Seal
6 Hollenbeck
Ave Harvard (ctr) Remington
(n/s) 49,046 Patch, Crackseal,
Slurry Seal
7 Hollenbeck
Ave Remington (s/s) Torrington (ctr) 47,277 Patch, Crackseal, Slurry Seal
8 Hollenbeck
Ave Torrington (ctr) Fremont (n/s) 50,298 Patch, Crackseal, Slurry Seal
9 Morse Ave Toyama (ctr) Weddell 53,229 Patch, Crackseal, Slurry Seal
10 Wolfe Rd Evelyn ctr) Reed/OSFR
(ctr) 128,549 Patch, Crackseal,
Slurry Seal
11 Wolfe Rd Reed/OSFR (ctr) Iris (ctr) 109,848 Patch, Crackseal, Slurry Seal
12 Wolfe Rd Iris (ctr) Gary (ctr) 76,140 Patch, Crackseal, Slurry Seal
13 Wolfe Rd Gary (ctr) Maria (ctr) 60,522 Patch, Crackseal, Slurry Seal
14 Wolfe Rd Maria( ctr) El Camino Real
(n/s) 67,604 Patch, Crackseal,
Slurry Seal

TOTAL SQ
FOOTAGE 1,150,881
Attachment 2

Page 6 of 12 ends

T-DPW-190043/62387 7
Council Agenda:

Item No.:

Project Title: Pavement Rehabilitation 2023, ST-23-XX
Project Description: Pavement Rehabilitation and Resurfacing Project Location: See table below
Estimated Project Schedule: May 2022 – October 2023
Estimated Project Useful Life: 10-20 years
No. Street Begin Location End Location SQ FT Project Treatment 1 Oak Creek Manzano Sandia 45,831 Mill & Fill
2 Torrance Havenwood (s/s) Wildwood 40,764 Mill & Fill
3 Persian N driveway of 1280
Persian
Lawrence
Expwy 24,570 Mill & Fill
4 Morse 1111 Morse Ave
(ctr of d/w) Toyama (ctr) 36,871 Mill & Fill
5 Morse Ferndale (n/s) Fernwood, N
(s/s) 17,315 Mill & Fill
6 Britton Wolfe Taylor 8,764 Mill & Fill
7 San
Patricio Coachella (s/s) Duane 15,600 Mill & Fill
8 Acacia Fair Oaks Bartlett 19,559 Mill & Fill
9 Molino Sutter Olive 23,490 Mill & Fill
10 Arlington
Ct Peach East end 13,580 Mill & Fill
11 Torrington Hollenbeck (e/s) Snowberry Ct
(ctr) 47,136 Mill & Fill
12 Wright Fremont (s/s) Cascade (ctr) 51,778 Mill & Fill 13 Cascade Prince Edward (ctr) Selo (ctr) 23,111 Mill & Fill 14 Cascade Selo (ctr) Sydney (ctr) 8,994 Mill & Fill
15 Humber Ct Blackhawk East end 11,708 Mill & Fill
16 Kenilworth
Ct Blackhawk East end 8,582 Mill & Fill
17 Kinross Ct Blackhawk East end 12,017 Mill & Fill
18 Benton Kensington Lochinvar
(n/s) 16,436 Mill & Fill
19 Dunford Oriole (e/s) Quail (w/s) 44,730 Mill & Fill
20 Dunford Quail (w/s) Teal (w/o) 30,710 Mill & Fill
21 Lanark Ct Quail West end 8,855 Mill & Fill
22 Lorne Swallow (e/s) East end 18,849 Mill & Fill
23 Norman El Camino Real Elizabeth (n/s) 36,774 Mill & Fill 24 Vireo Lochinvar (s/s) London (n/s) 18,656 Mill & Fill

TOTAL SQ
FOOTAGE 584,680
Attachment 2

Page 7 of 12 ends

T-DPW-190043/62387 8
Council Agenda:

Item No.:

4. The following tables consist of proposed and adopted projects from fiscal year 2021/22. The City of Sunnyvale may utilize fiscal year 2022/23 Road Maintenance and Rehabilitation Account revenues for projects adopted in the prior fiscal year.

With the relisting of these projects in this Resolution, the City of Sunnyvale is reaffirming to the public and the State its intent to fund the following projects with 2022/23 Road Maintenance and Rehabilitation Account revenues:

Project Title: Pavement Rehabilitation 2022-SB1, ST-21-05 Project Description: Previous FY 2021/2022 Projects for FY 2022-23 RMRA Funding (Pavement Rehabilitation and Resurfacing, Patch and Crackseal) Project Location: See tables below
Estimated Project Schedule: February 2021 – October 2023 Estimated Project Useful Life: 10-20 years
No. Street Begins Ends SQ FT Projected
Treatment
1 Cascade Dr S Bernardo
Ave Wright Ave (w/s) 49,000 Mill & fill
2 Cheyenne Drive Owen Sound
Drive (ctr)
Drain Inlet on
Valcartier, Electric
Light Pole# 5C17
52,020 Mill & fill
3 Connemara
Way
Sunnyvale
Saratoga Rd
(e/s)
Bittern Drive (w/s) 41,460 Mill & fill
4 Cortez Dr Acalanes Dr
(e/s)
S Bernardo Ave
(w/s) 36,676 Mill & fill
5 Enderby Wy Cascade Dr
(n/s) North end 5,162 Mill & fill
6 Gail Ave Iris Ave (s/s)
Linden Ave,
Electric Light Pole
#13D03
58,456 Mill & fill
7 Lark Ln Linnet Lane Shetland Place 37,257 Mill & fill 8 Lawrence
Station Rd Kifer Rd (s/s) Below ctr of
overpass 37,125 Mill & fill
9 Lochinvar Ave Calabazas
Creek (e/s) Waxwing Ave (ctr) 24,394 Mill & fill
10 Lochinvar Ave Waxwing
(ctr) Lawrence Expwy 17,751 Mill & fill
11 Old San
Francisco Rd
Fair Oaks
Ave (e/s) Wolfe Road (w/s) 159,871 Mill & fill
12 S Murphy Ave W Iowa Ave ECR n/s (end of 35,424 Mill & fill Attachment 2

Page 8 of 12 ends

T-DPW-190043/62387 9
Council Agenda:

Item No.:
(s/s) island)
13 Sandia Ave Wildwood
Ave Havenwood Ave 55,068 Mill & fill
14 Sheraton Dr Hollenbeck
Ave Spinosa Dr 43,680 Mill & fill
15 Spinosa Dr W Remington
Dr (s/s) Snowberry Ct (ctr) 28,981 Mill & fill
16 Teal Dr Castleton
Way Dunford Way (n/o) 49,366 Mill & fill
17 W Maude Ave N Pastoria
Ave (e/s)
N Mathilda Ave
(w/s) 63,398 Mill & fill
18 E Arques Ave Fair Oaks Ave
(e/s) N Wolfe Road (w/s) 119,930 Mill & fill
19 Vienna Dr Tasman South end 50,698 Mill & Fill

TOTAL SQ
FOOTAGE 845,787
No. Street Begins Ends SQ FT Projected
Treatment
1 E Arques Ave Commercial Lawrence Expwy 219,852 Patch & Crackseal
2 E Arques Ave
Lawrence
Expwy w/o
island nose
Ctr of Lakeside 43,313 Patch &
Crackseal
3 E Arques Ave Ctr of
Lakeside Ctr of Oakmead 85,075 Patch &
Crackseal
4 Hollenbeck Ave El Camino
Real (s/s) Danforth (ctr) 109,802 Patch &
Crackseal
5 Hollenbeck Ave Danforth (ctr) Harvard (ctr) 49,626 Patch & Crackseal
6 Hollenbeck Ave Harvard (ctr) Remington (n/s) 49,046 Patch & Crackseal
7 Hollenbeck Ave Remington
(s/s) Torrington (ctr) 47,277 Patch &
Crackseal
8 Hollenbeck Ave Torrington
(ctr) Fremont (n/s) 50,298 Patch &
Crackseal
9 Morse Ave Toyama (ctr) Weddell 53,229 Patch &
Crackseal

TOTAL SQ
FOOTAGE 707,518
Attachment 2

Page 9 of 12 ends

T-DPW-190043/62387 10
Council Agenda:

Item No.:

Project Title: Slurry Seal 2021 B, ST-21-07
Project Description: Previous FY 2021/2022 Projects for FY 2022-23 RMRA Funding (Asphalt Patching)
Project Location: See table below
Estimated Project Schedule: January 2021 to October 2022 Estimated Project Useful Life: 10-20 years
No Street Begins Ends SQ FT Patching
SQ FT
1 Birchwood Drive Elko Dr (s/s) Tasman Dr (n/s) 38,852 0 2 Borregas Ave Caspian (s/s) W Java Dr (n/s) 34,000 0
3 California Ave Belmont/La Mesa
Terrace (ctr) Pajaro Ave (ctr) 14,710 943
4 E. Evelyn Ave Fair Oaks Ave
(e/s) S Wolfe RD (w/s) 58,654 1,123
5 Fair Oaks Avenue E. Evelyn Avenue
(ctr)
El Camino Real
(n/s) 273,008 0
6 Geneva Dr Caribbean Dr
(s/s) Java Dr (n/s) 80,712 35
7 Kifer Road Fair Oaks Avenue
(e/s)
N. Wolfe Road
(w/s) 119,878 0
8 Macara Ave Benicia Ave (s/s) W Maude Ave
(n/s) 29,471 2,715
9 Old San
Francisco Rd
Sunnyvale Ave
(e/s) Carroll St (ctr) 12,587 893
10 Old San
Francisco Rd Carroll St (ctr) S Bayview Ave
(ctr) 35,544 220
11 Old San
Francisco Rd
S Bayview Ave
(ctr) Cezanne Dr (ctr) 21,799 419
12 Old San
Francisco Rd Cezanne Dr (ctr) Central Ave (ctr) 16,585 212 13 Old San
Francisco Rd Central Ave (ctr) S Fair Oaks Ave
(w/s) 51,016 834
14 S Sunnyvale Ave El Camino Real
(n/s) E Olive Ave (ctr) 74,072 3,402
15 Tasman Drive Fair Oaks Avenue
(e/s)
Calabazas Creek
(w/s) 355,207 0
16 Helena S Bernardo Ave
(e/s) Wright Ave (w/s) 48,477 0
17 Anvilwood Old Mountain
View-Alviso (s/s) Elko Dr (n/s) 51,920 0

TOTAL SQ
FOOTAGE 1,264,572 10796
Attachment 2

Page 10 of 12 ends

T-DPW-190043/62387 11
Council Agenda:

Item No.:

Project Title: Pavement Rehabilitation Wolfe Road, ST-21-08 Project Description: Previous FY 2021/2022 Projects for FY 2022-23 RMRA Funds (Pavement Rehabilitation and Resurfacing)
Project Location: See table below
Estimated Project Schedule: July 2021 to October 2023
Estimated Project Useful Life: 10-20 years
No. Street Begins Ends SQ FT Projected
Treatment
1 Wolfe Rd Fremont El Camino Real (s/s) 22,637 Mill & fill 2 Wolfe Rd Marion Fremont 152,368 Mill & fill
3 Wolfe Rd Inverness Marion 88,407 Mill & fill
4 Wolfe Rd Homestead City
Limit Inverness 69,000 Mill & fill

TOTAL SQ
FOOTAGE 332,412

5. The City Council hereby directs City Staff to submit said Project Lists to the California Transportation Commission.

6. This Resolution shall take effect immediately upon its adoption.

Attachment 2

Page 11 of 12 ends

T-DPW-190043/62387 12
Council Agenda:

Item No.:

Adopted by the City Council at a regular meeting held on ___________, by the following vote:

AYES:

NOES:

ABSTAIN:

ABSENT:

RECUSAL:

ATTEST: APPROVED:
__________________________________ _________________________________ City Clerk Mayor
(SEAL)
APPROVED AS TO FORM:
___________________________________
City Attorney
Attachment 2

Page 12 of 12 ends